[0:14]
Yes, sir.
[0:20]
» It's 6:30. I'll call this meeting to
[0:22]
order. First up, pledge of
[0:24]
» Allegiance.
[0:28]
I pledge algiance to the flag of the
[0:31]
United States of America [clears throat]
[0:32]
and to the republic for which it stands.
[0:36]
One nation under God, indivisible with
[0:39]
liberty for all.
[0:48]
So, uh, Mayor V and Corbus are
[0:52]
unavailable tonight. Uh, so I'll be
[0:54]
running the meeting. Um, as comments,
[0:58]
uh, the steak feed, uh, had a great
[1:00]
turnout. Um, and, uh,
[1:08]
okay. And, uh, tomorrow night is the,
[1:11]
uh, national night out. Um, I believe we
[1:14]
got
[1:17]
still use some more. Uh, anyone wanting
[1:20]
to help out, please contact the police
[1:22]
department and
[1:25]
See everybody there?
[1:32]
» Uh, no comments.
[1:36]
» Yeah. Uh, hopefully everybody enjoyed
[1:38]
the steak feed. Hopefully everybody
[1:39]
comes out tomorrow night. Uh, Teresa,
[1:42]
thanks for all your library uh,
[1:44]
Wednesdays for my grandkids. They enjoy
[1:48]
that. Mark to your staff down the
[1:50]
riverwalk cutting brush along the
[1:53]
pathway. Looks really good. So
[1:57]
that's your pleasure.
[2:01]
» Well, just a couple things. Number one
[2:03]
is I have finally totally retired.
[2:07]
I turned in my keys and everything to
[2:09]
the DA's office on Friday. So,
[2:13]
» Officially done. So, um,
[2:20]
Cory says, "I am now retired. Don't even
[2:23]
think about going back." So, um, anyway,
[2:28]
um,
[2:30]
won't make national night out tomorrow
[2:32]
because I'm teaching reserve officer
[2:34]
training academy. So, but they've been
[2:38]
great in the past and I hope everybody
[2:40]
turns out it's a wonderful experience.
[2:47]
Next up is the consent calendar meeting
[2:50]
minutes for July 6, 2026.
[3:01]
» July 6th of 2026.
[3:03]
» Second.
[3:05]
All right. Second. Any discussion?
[3:09]
All those in favor? I.
[3:11]
» Any oppos?
[3:15]
Uh, next up is staff reports.
[3:22]
Um,
[3:25]
so only thing to add in my report, um,
[3:28]
you know, I did put in here that we'll
[3:30]
have some res revisions the city fire
[3:32]
code and, uh, we had to do a public
[3:35]
notice for that because it will be by
[3:37]
ordinance and the public notices, uh,
[3:39]
you know, Liz has already done those. So
[3:42]
you'll be seeing those at our September
[3:43]
8th meeting, you know, highlighting
[3:45]
September 8th, a Tuesday because of the
[3:48]
holiday. So
[3:50]
um basically it and you'll get to see
[3:53]
them, you know, in the packet, but
[3:54]
basically it it um gives some of the
[3:59]
items which we have reserved in our code
[4:00]
back to the state fire marshall's
[4:02]
office. Since we have a resident state
[4:04]
fire marshal, it makes um that a lot
[4:07]
simple simpler, you know, and and
[4:10]
they're more than um willing to help out
[4:13]
our fire department, investigative
[4:14]
needs, all those kind of things. So,
[4:16]
pretty excited about that.
[4:19]
And that's all I have unless there's any
[4:22]
questions.
[4:29]
So, is our new finance.
[4:32]
So, uh, I'll actually give the report,
[4:33]
but I wanted to introduce Mike Mallerie
[4:35]
to the council members and the
[4:37]
committee. The department heads all
[4:39]
[clears throat] met him. Um, he's been
[4:40]
on board for weeks,
[4:42]
» Couple weeks. So, um, you
[4:45]
[clears throat] know, there's yours in
[4:47]
the finance uh, report they're mine, not
[4:49]
his, but next month that'll be that'll
[4:53]
be his problem. Okay. Um, on the finance
[4:57]
report, you know, there's two in here.
[5:00]
one is the uh unodudited
[5:03]
uh end of July uh report for fiscal year
[5:06]
2627 we run like for two weeks a week um
[5:11]
a month 13 to close out previous fiscal
[5:14]
year stuff. So um
[5:18]
you know nothing
[5:20]
too abnormal there. you'll see that uh
[5:24]
Andrew's fund, you know, has a negative
[5:27]
beginning fund balance and uh well,
[5:31]
that's because we had some building
[5:33]
issues, but that building is being
[5:35]
caught up. So, though obviously that's
[5:38]
going to be this, you know, current
[5:39]
fiscal year, but uh we're okay with
[5:42]
that. I think the water fund um you know
[5:45]
had a better uh beginning fund balance
[5:49]
than we thought and sur fund a little
[5:52]
bit less but you know that kind of stuff
[5:54]
shakes out. Obviously the fire fund um
[5:57]
is in the uh red right now but that is
[6:01]
because we haven't made transfers from
[6:02]
the general fund or you know received
[6:05]
payment from the royal fire district.
[6:06]
Pretty simple stuff though. So that is
[6:12]
» [clears throat]
[6:12]
» Uh basically it and then you know the
[6:15]
starting year report not a whole lot of
[6:17]
expenses in there. Um you know
[6:22]
yeah
[6:24]
anyway that's what I've got
[6:27]
for this month.
[6:37]
So fire.
[6:40]
» Uh the only thing I'd like to add is
[6:41]
that we had we did have the steak feed
[6:43]
um this weekend and we did sell out of
[6:46]
all of our steak meals. So I believe
[6:47]
just over 825 I believe was the number
[6:50]
in total. Uh it was a great turnout. So
[6:53]
I want to thank all the sponsors that
[6:54]
came out and helped uh make that event
[6:56]
happen. That's a huge event for our
[6:58]
department. So I just want to thank
[6:59]
everybody that came out and had a great
[7:00]
time. Um other than that I can answer
[7:03]
any questions that you might have.
[7:11]
Thank you. Next up is uh planning.
[7:19]
I have nothing to add to my report. Let
[7:22]
me know if you have any questions.
[7:38]
Next up is public works.
[7:43]
» Thank you, council. Um, uh, something to
[7:45]
add to my report, uh, because a couple
[7:47]
things actually we just found out about
[7:49]
last week. And, uh, thank you, Haley,
[7:51]
for saving the thunder for me. But we
[7:54]
did get awarded our, uh, $250,000,
[7:56]
uh, small city a lotment grant for
[7:58]
paving fur. Uh, that is going to require
[8:01]
a substantial city commitment as well.
[8:03]
um we won't know really how much until
[8:06]
we get further uh into the pre-esign and
[8:08]
that activity won't begin until we get a
[8:11]
contract uh in hand [clears throat] from
[8:14]
ODOT which should be around October I
[8:16]
suspect. Um
[8:19]
the other thing to to add to is uh uh
[8:22]
there's a pre-construction meeting uh
[8:24]
tomorrow uh regarding the timber sale up
[8:27]
at Ring Creek. So, I don't I don't know
[8:30]
have any more details on their schedule
[8:31]
up there, but I know that, you know,
[8:33]
probably pretty soon uh after this
[8:34]
meeting, they're going to get working up
[8:36]
there. Uh with that, I'm happy to answer
[8:38]
your questions.
[8:58]
Next up is
[9:05]
I have nothing to add, but I'd be happy
[9:06]
to answer any questions you might have.
[9:21]
Any questions?
[9:23]
Thank you. All right. Next up is police.
[9:30]
» Nothing to add to my report. Uh just
[9:32]
want to plug uh National Night Out. Uh
[9:35]
just hope to see everybody there and if
[9:36]
anyone is uh feels inclined to come help
[9:40]
out. Uh we'd certainly appreciate that.
[9:43]
Otherwise, I'll be happy to answer any
[9:45]
questions that the council may have.
[9:58]
Last but not least, city recorder.
[10:16]
Anyone sign up for public participation?
[10:22]
Uh, no sir.
[10:23]
» Okay,
[10:24]
» Council
[10:26]
apologize. I didn't realize there's a
[10:28]
sign in process. May I have a moment?
[10:35]
» Step up to the microphone. Um, it's uh
[10:38]
we'll have three minutes
[10:41]
shorter than that.
[10:42]
» Okay. Uh, I want to introduce myself and
[10:45]
council. Thank you for just a couple of
[10:46]
minutes. My name is Tom Parker. I'm the
[10:49]
interim CEO at the hospital. As many of
[10:52]
you know, uh Jeff Lang um moved on to a
[10:56]
position in uh state of Minnesota,
[10:58]
actually where I was born. Um and uh uh
[11:02]
I retired from a career in u in hospital
[11:06]
uh administration back in January. Um
[11:10]
unfortunately or fortunately the uh
[11:12]
recruiting firm who is working on the
[11:14]
interim placement and I have had a
[11:16]
long-standing relationship over the
[11:18]
years and they called me and and now I
[11:20]
stand before you uh to introduce myself.
[11:23]
Um you have a gem of a hospital here. Um
[11:28]
it's just such a privilege to work
[11:31]
there. I have in my fourth week it's a a
[11:34]
fabulous team of people very committed.
[11:37]
They work well together. Uh my job here
[11:40]
over the next 6 to9 months is to keep
[11:42]
things going and hand off to your
[11:44]
permanent new CEO a well-running
[11:47]
organization. That won't be hard because
[11:50]
it is a very good organization and I'm
[11:53]
thoroughly enjoying getting to know the
[11:55]
staff there. Um and uh uh open to any uh
[12:00]
feedback that you may have about your
[12:02]
hospital that I can help you with. But
[12:03]
again, tonight was just an introduction
[12:05]
to you and the staff here. Excuse you.
[12:10]
Thank you.
[12:24]
Next up is agenda item number eight. Uh
[12:28]
award of the
[12:31]
funded by SDWR.
[12:37]
Thank you, council. And uh you guys
[12:39]
should all have received some
[12:41]
supplemental information at at meeting
[12:43]
time. Um sorry for all the the late
[12:47]
additional information, but this is just
[12:48]
an ongoing process. Uh we were working
[12:50]
on it well into last week. And I think
[12:53]
the easiest way to to take you through
[12:55]
this is maybe go to page three of that
[12:58]
packet. Uh the one that starts with
[13:01]
additional information for agenda item
[13:03]
8. So, if you look up at the top uh
[13:07]
graph up there, you'll see uh WCC bid
[13:11]
cost. The West Coast contractors was the
[13:14]
soldier. We went over that last month uh
[13:16]
for this project. Um they bid on all
[13:19]
three schedules for this project and
[13:21]
their total came to uh a little over 3.7
[13:24]
million which was um almost 1.2 2
[13:28]
million over uh what we had budgeted the
[13:32]
budget that we had submitted to the
[13:33]
funding agency for construction period.
[13:35]
Um through negotiations with them and
[13:39]
slightly uh reducing the scope of work,
[13:42]
we got that total down uh to just under
[13:45]
$3 million for their contract. Um
[13:49]
the omitted was the one seismic valve at
[13:52]
the ordering tank. Uh we're still
[13:54]
putting one in at the Nolton tank. Um we
[13:58]
allowed for a change in method for
[14:00]
dredging the reservoir from uh from
[14:03]
pumped uh to clamshell dredging. Um we
[14:07]
extended the project completion uh for a
[14:10]
couple months and then we made
[14:12]
clarifications with them. Now these were
[14:14]
items that we intended to do. It was
[14:16]
just maybe not clear in the spec, not
[14:19]
clear to the contractor, but when we
[14:21]
asked for their their schedule of
[14:22]
values, it was clear that they had put
[14:25]
stuff in there that they they didn't
[14:26]
need to have in there. Um, so all of
[14:29]
that uh allowed them to reduce their
[14:32]
price to this uh 2.988295.
[14:35]
Um, now if you add in uh a couple of
[14:38]
other uh construction costs outside of
[14:41]
the West Coast work, we come up to just
[14:42]
over $3 million. Um so if you look at
[14:46]
the graph on the bottom um you can see
[14:49]
the the first column that's
[14:53]
the the amount and the budget items the
[14:57]
that each and of those categories that
[14:58]
were submitted to the funding agency. So
[15:02]
what we did to increase our construction
[15:04]
budget from 2.547 to 3.015
[15:09]
uh first of all the engineers reduced
[15:11]
their fee by uh by $200,000.
[15:14]
um
[15:16]
small thing. Um and if you guys know how
[15:19]
these engineering budgets are built and
[15:20]
submitted, they're uh there's usually
[15:24]
like a formula for it. So you you take
[15:26]
your your full project amount and you
[15:28]
take about 14% set for design, 2% for
[15:31]
bidding, and 4% for construction
[15:34]
management, which brings you to 20%.
[15:36]
That was their 20%. Well, they were very
[15:38]
comfortable saying they could do this to
[15:40]
uh based on where they were after
[15:42]
design. um for 310,000 instead of
[15:46]
509,000. So that we gained some money
[15:49]
there. Um
[15:51]
so uh the environmental review
[15:54]
um and uh and the permitting and
[15:56]
regulatory fees were reduced and that
[16:00]
that was when we discovered if we
[16:02]
weren't going to be discharging any
[16:03]
water overland uh we didn't need, you
[16:05]
know, a lot of the permits that we
[16:07]
thought we we might need. So that we
[16:08]
don't intend to spend any of that money.
[16:11]
Um, so we've preliminarily submitted
[16:14]
this to the funding agency, this revised
[16:16]
budget, and uh, one thing they let us
[16:18]
know was that contingency was still
[16:21]
going to have to be 10% of the
[16:23]
construction cost. So, uh, what we did
[16:27]
and and what is typical in these
[16:29]
projects, sometimes in these projects,
[16:30]
emergency owners put up the contingency
[16:32]
first off to maximize the use of the
[16:35]
available funding in the hopes that they
[16:37]
don't spend that contingency. So, our
[16:39]
budget still has $135,000
[16:42]
of funded contingency. But what, you
[16:45]
know, we'll we will be committing the
[16:48]
city and the water fund to is up to an
[16:50]
additional $165,000
[16:52]
of contingency, which I never hope to
[16:55]
spend, but I we're very comfortable with
[16:57]
this number considering that the um
[17:00]
contingency line in the 2627 water fund
[17:03]
is over $400,000. So, you know, we don't
[17:07]
want to spend that. We want to save
[17:08]
that, stockpile that, build our war
[17:10]
chest for other big capital
[17:12]
improvements. But um if we need to use
[17:14]
it for this one, uh we've told the
[17:16]
funding agency that we will. Uh
[17:20]
so what's next is um
[17:26]
and you can see the breakdown for the um
[17:30]
their schedule of values. Um if if
[17:33]
anyone's uh interested or or wants to
[17:36]
dig into that more, um
[17:39]
we're asking council tonight uh is to
[17:43]
first of all accept the sole responsive
[17:45]
bid uh received from West Coast
[17:47]
contractors uh and then to uh
[17:52]
uh motion to approve award of the
[17:54]
contract uh to West Coast contractors in
[17:58]
that stated amount pending funding
[18:00]
agency approval. approval of the revised
[18:02]
budget and uh project schedule.
[18:06]
So, happy to answer any questions you
[18:08]
have about the process.
[18:10]
Yes, Mark, I have a question. So, the
[18:13]
first first page, first thing that jumps
[18:16]
out at me is we got $3.491
[18:19]
million
[18:20]
from the fund and we budgeted and you
[18:25]
said that we budgeted 2.5.
[18:29]
Can you explain that $900,000? Where's
[18:32]
that $900,000 difference? Where's that
[18:34]
going? That that is for engineering, uh,
[18:37]
labor standards compliance, um,
[18:39]
environmental review, federal
[18:41]
requirements, um, uh, legal fees,
[18:44]
permitting and regulatory fees.
[18:46]
» 2.5.
[18:50]
» Okay. So, we but we got 3.4 4
[18:55]
and they came and their bid was 3.7.
[19:00]
Correct.
[19:02]
That's not 2.5.
[19:05]
Our budget includes the whole project
[19:07]
which is permitting, design, and
[19:10]
construction 1 2 3.
[19:12]
» So the construction budget is only a
[19:14]
fraction of the total budget.
[19:17]
» So a large a large fraction most of it.
[19:20]
But
[19:21]
» And the construction budget was what
[19:23]
mark 2.5
[19:26]
» 2.547 was the original construction
[19:28]
budget.
[19:29]
» Okay.
[19:49]
You mentioned the Oring Heights tank.
[19:52]
Yes.
[19:52]
» The valve seismic valve. Is that valve
[19:55]
okay? That's my neighborhood where I
[19:57]
live.
[19:58]
» Is that at some point that'll get
[20:01]
replaced or
[20:02]
» Well, yeah, there's uh the only thing up
[20:05]
there now is an altitude valve that's
[20:06]
not used anymore. They they used to uh
[20:08]
run the system a little bit differently.
[20:10]
I think they found that um it it
[20:12]
basically is is almost the same
[20:15]
elevation as the Molton Heights tank. So
[20:16]
we just let the system uh fill it. And
[20:20]
the reason for the seismic valves is in
[20:22]
the event of a big a big seismic event
[20:25]
um you figure your lines are going to
[20:26]
start. You're going to have some line
[20:27]
breaks in there and the seismic valves
[20:29]
will immediately shut to retain whatever
[20:31]
water you have in that tank. So we will
[20:34]
still have the Nolton Heights storage.
[20:35]
we won't have the benefit of the of the
[20:37]
ordering storage. Now, um the other
[20:41]
thing is we we have to go clear across
[20:43]
town to feed the hoarding tank. So, if
[20:45]
there's a more valuable seismic valve to
[20:47]
have and tank to be using, of course,
[20:49]
it's the Nolton Heights tank. And
[20:51]
reality is, um you know, if lines start
[20:54]
breaking, it it's not going to be a
[20:56]
matter of, you know, we just turn on the
[20:57]
water again. But to fix a single line
[21:01]
from the treatment plant down to the
[21:02]
Milton Heights tank still gives us a big
[21:04]
storage area where, you know, residents,
[21:07]
you know, fire department, you know,
[21:09]
somebody can get have a spot to go fill
[21:11]
and we have a storage area um uh for,
[21:15]
you know, for some portable water.
[21:17]
» Okay.
[21:17]
» Yeah. Thank you.
[21:27]
to award the contract to the of the
[21:30]
construction of the city's water
[21:31]
reservoir. And I I don't I don't
[21:38]
page
[21:43]
to accept the the loan response bid uh
[21:46]
for the city of Pakil
[21:49]
um SWR LF water improvement project uh
[21:53]
received on June 17th, 2026 from West
[21:56]
Coast contractors in the amount of
[22:00]
I think lowered that amount Well, we're
[22:03]
now accepting a bid with this motion.
[22:05]
» Okay. Yeah, we're accept Yeah, we accept
[22:08]
that bid. Yeah. Yeah.
[22:13]
I'll second it. When you list the amount
[22:16]
in the motion or 3,
[22:19]
uh
[22:21]
3,15,895,
[22:23]
right? That was the 3,723,000
[22:28]
was the motion verbatim. But I thought I
[22:31]
thought the amount was that came in was
[22:33]
less than the
[22:36]
that was that was the original bid.
[22:40]
» So we have to accept the bid before we
[22:42]
can award the contract. Correct. Change
[22:44]
the amount with the higher
[22:47]
» Correct. Yeah.
[22:48]
» Okay. So we have to accept the 3.7 bid.
[22:51]
» Right.
[22:52]
» But we're not obligated to pay 3.7 when
[22:55]
we award the contract.
[22:56]
» We're not awarding the contract at that
[22:57]
amount. We're just accepting that the
[22:59]
bid was well responsive.
[23:00]
» Yes.
[23:01]
» Then the contract would be the second
[23:03]
motion which would be 2.9 million.
[23:07]
» Okay. Okay. So correct that. Uh
[23:11]
let me restart. Uh move to accept the
[23:13]
the response bid from the city of Cook
[23:16]
SDWR
[23:18]
water improvement project received June
[23:20]
17th 2026 from West Coast contractors in
[23:23]
the amount of 3,723,000.
[23:29]
Second.
[23:30]
» All right. Motion made and seconded. Any
[23:32]
discussion? All those in favor?
[23:38]
» Hearing none. Motion carries.
[23:41]
All right. I'll move to award the
[23:43]
contract for the construction of the
[23:44]
city's water reservoir and tank uh
[23:48]
reconditioning and repair project to the
[23:49]
West Coast contractors in the amount of
[23:52]
2,988,200
[23:56]
uh 295
[23:59]
pending funding agency approval.
[24:01]
» Second.
[24:03]
» All right. Motion made and seconded. Any
[24:05]
discussion on that?
[24:07]
All those in favor? I. Any opposed?
[24:24]
Next up is agenda item number nine.
[24:27]
Consider resolution 11-2026
[24:30]
adding a new administrator for online
[24:32]
access and authorizing of the city bank
[24:35]
accounts.
[24:40]
standing procedure council. Um, Mr.
[24:43]
Mallalerie wants to be able to, you
[24:45]
know, have all this fun. So, this is the
[24:48]
correct resolution that we've used in
[24:51]
the past to uh give him proper access
[24:54]
and responsibility for our various
[24:57]
accounts.
[24:59]
I move we approve resolution number
[25:01]
11-2026.
[25:07]
Second
[25:09]
motion made and seconded. Any
[25:11]
discussion? All those in favor?
[25:13]
» I
[25:18]
next agenda item 10, authorization to
[25:21]
reallocate funds.
[25:23]
So, uh, I did put on the DS evening, uh,
[25:26]
an additional item just to show council
[25:29]
that in fact, um, on the mortgage, which
[25:32]
is the real estate loan listed here for
[25:34]
city hall, that we're actually ahead on
[25:37]
our payments there, and we did budget a
[25:39]
payment this year, as we do every year,
[25:42]
but we're not actually have one due till
[25:44]
July of 2029.
[25:46]
So, uh, based on the, uh,
[25:51]
oh, the destruction of the charger, so
[25:53]
to speak, um, came became more imminent
[25:56]
than what we had planned. And as you all
[26:00]
probably know, um, no more chargers,
[26:03]
right? So, you know, the next thing is
[26:06]
then you have to get Durango. And, uh,
[26:09]
you know, chargers were relatively
[26:11]
inexpensive, I suppose.
[26:14]
um but you know just they're not
[26:16]
available. So with the combination of
[26:19]
the insurance money that we'll get for
[26:20]
the charger uh being totaled along with
[26:23]
$35,000 that we already had in equipment
[26:26]
reserves for a police car, we will still
[26:28]
need somewhere between 19 and $21,000.
[26:34]
So, what we're asking council to do is
[26:35]
to allow us to re allocate those funds
[26:39]
um to be spent on the Durango.
[26:45]
» We um Why do we have it budgeted if it
[26:48]
wasn't due until 2029? because we were
[26:51]
paying ahead, which is a good
[26:52]
» Okay
[26:53]
» Thing to do on mortgages, but
[26:56]
um it's nice to be ahead on something,
[26:58]
but yeah.
[27:03]
» Move we approve reallocation of up to
[27:06]
$21,000
[27:08]
replacement vehicle for the police
[27:10]
department. Second
[27:24]
uh consider northwest natural easement
[27:27]
on GP lot number 10.
[27:34]
So, uh again, I think I can get us to
[27:37]
this pretty quickly. If you go to the
[27:38]
last page of this, uh agenda item, this
[27:42]
colorful diagram that I put together. Um
[27:46]
so what you're looking at there is uh
[27:49]
what is commonly known to us as GP lot
[27:52]
10. Uh and that's the approximately 79
[27:55]
acre parcel that is just to the south of
[27:58]
the ODOT office on Highway 42.
[28:01]
So, what Northwest intends to do is
[28:04]
reroute some of that gas line and
[28:07]
they're going to uh just continue along
[28:09]
the river right at about Ring Creek and
[28:12]
the and cut up through the Jacobson
[28:13]
property there where we access our river
[28:15]
pumps and then follow Highway 42 up to
[28:19]
their transfer station just south of ODO
[28:21]
up to GP lot 10. Um,
[28:24]
in order to get to their station,
[28:26]
however, they need to get around a uh a
[28:29]
wetlands area. [clears throat] uh that
[28:30]
you can see from this diagram. So the
[28:32]
yellow is approximately what they're
[28:35]
looking for for easement uh from the
[28:37]
city. Um so that's through uh partial
[28:40]
number 202. Uh partial number 203, which
[28:44]
is just to the south, is also owned by
[28:45]
the city, but is almost entirely
[28:48]
encumbered by a Northwest Nashville
[28:50]
easement for their transfer station. Um
[28:52]
so uh they they asked the city uh to
[28:57]
grant them this easement to run the
[28:58]
pipeline through 203 or 202 and um what
[29:04]
staff or I asked them uh was uh maybe in
[29:08]
lie of some payment for that would they
[29:11]
consider improving their access to on
[29:14]
the southwest portion of this station so
[29:17]
that could be used as the uh primary
[29:19]
access and the gain for us there is um
[29:25]
anyone if the city or you know anybody
[29:27]
we sell the property to wants to develop
[29:29]
that lot 202 in the future they don't
[29:31]
have to worry for you know lengths of
[29:33]
time about u the gas company trying to
[29:36]
get in there and I' I'd like to steer
[29:38]
them towards that that other access but
[29:41]
what that would involve for them is
[29:42]
installing a new gate um and putting
[29:45]
some fill and rock and and basically
[29:47]
improving that road uh and where that is
[29:50]
is right It's basically the blue part
[29:52]
there is what they'd have to improve.
[29:54]
The red part we've already improved um
[29:57]
and we we use that uh you know both for
[30:00]
maintenance access back there and our
[30:02]
Riverwalk users like to use it too as a
[30:04]
loop. Um the yellow valve in there I
[30:07]
marked was another thing I asked them
[30:09]
that that valve box was too low and we
[30:11]
haven't been able to fill that little
[30:12]
corner in there and uh they I actually
[30:15]
just saw a work order for them to come
[30:16]
out and do that. So, they intend to
[30:17]
raise that valve box up and they intend
[30:20]
to uh improve that access as well. Um,
[30:24]
they'd like to get going on this
[30:26]
project. However, they didn't have the
[30:28]
easements for me to bring to you to to
[30:31]
improve since this is for somebody
[30:33]
else's benefit, not the city's benefit.
[30:35]
It goes beyond staff level approval.
[30:37]
This easement and and goes to council.
[30:40]
um they said in of that they would like
[30:43]
us that would allow them to keep moving
[30:44]
on their project is to sign the letter
[30:47]
of intent uh included in this packet. Um
[30:51]
and uh they also included a workspace
[30:54]
agreement. I don't think I think that's
[30:57]
something that's probably within the
[30:58]
city manager's preview to agree. It's
[31:00]
just a temporary workspace agreement
[31:02]
around the pipeline, but I included in
[31:04]
here nonetheless for you guys to uh make
[31:06]
a motion on. Uh so I guess what we're
[31:08]
asking tonight is to uh authorize the
[31:12]
the signing of this letter of intent uh
[31:15]
to to grant the easement, you know, with
[31:18]
the the understanding uh here in written
[31:21]
in that um in that agreement that they
[31:24]
will be improving their access to the
[31:26]
southern southwest corner of the
[31:28]
station. Uh and when they have these
[31:31]
easements ready, which did they actually
[31:34]
send those over?
[31:35]
» We did.
[31:35]
» Okay.
[31:37]
Okay. Yeah. So, we we just we just got
[31:40]
those and then we'll be bringing those
[31:43]
uh you know to council, but uh at next
[31:46]
month's meeting, but this will allow
[31:47]
them to p uh p continue with their work
[31:50]
on schedule here. They're trying to get
[31:52]
this done pretty quick. Um
[31:56]
any questions you guys have about this?
[32:04]
Instead of buying the easement, they're
[32:06]
agreeing to improve that road and fix
[32:09]
that switch or whatever.
[32:12]
» I'm sorry.
[32:13]
» Instead of paying us money for the
[32:15]
easement, they're agreeing to improve
[32:18]
the road and then also do that extra
[32:20]
work,
[32:21]
» The access. Yeah, the Yeah, the road to
[32:23]
that access point and install the gate
[32:25]
and make that their primary access. Um,
[32:28]
and I should add that um, real market
[32:31]
value on this 24 2600 square ft uh, is
[32:37]
less than $2,000. And I think a standard
[32:40]
um, for easements like this is not a
[32:42]
very restrictive easement. I think we'll
[32:44]
be allowed to pave over it and put
[32:45]
concrete curb and things like that, new
[32:47]
buildings certainly um, which probably
[32:50]
wouldn't go in this area anyway. If you
[32:52]
see how this lot would be developed,
[32:55]
I think that those are typically, you
[32:57]
know, 75 down to 50%, usually in the 50%
[33:01]
level of real real market value uh for
[33:04]
that square footage, which would put it
[33:06]
at about $1,000. And uh I can promise
[33:08]
you I'll be doing more than $1,000 worth
[33:10]
of work on the access, but not not too
[33:13]
much more. You know, it doesn't involve
[33:14]
too much, but it will be put in a new
[33:16]
gate, uh bringing in some fill, bringing
[33:18]
in some rock. So it would be to the
[33:20]
benefit of the city to let them have
[33:22]
this easement.
[33:23]
» Yes, it will be. Yeah.
[33:34]
to approve the signing of a letter of
[33:35]
intent and temporary working space
[33:37]
agreement between the city of Kquil and
[33:39]
Northwest Natural Gas Company related to
[33:41]
the easements on uh 28s 13 uh W01
[33:49]
DD 00220
[33:53]
GP lot 10. [clears throat]
[33:57]
All right, move a seconded. Any
[33:59]
discussion? All those in favor? I
[34:02]
» I
[34:04]
carries
[34:08]
um for get of the order. Our next city
[34:11]
council meeting will be Tuesday,
[34:14]
September 8th, I believe, is Labor Day.
[34:17]
» Yes.
[34:18]
» Uh anything else go to the order.
[34:25]
» 7:04 I journ the regular meeting and at
[34:29]
7:04 I will Let's
[34:35]
consent calendar meeting minutes for
[34:37]
July 6, 2026.
[34:47]
» I move we approve the consent calendar.
[34:51]
Second
[34:53]
motion made and seconded. Any
[34:55]
discussion? All those in favor?
[35:01]
» [snorts]
[35:02]
» Uh next up is consider request for UR.
[35:09]
Um
[35:10]
so the chief has you know tried to get
[35:12]
new written bids since the last um time
[35:15]
this item was considered and we just at
[35:19]
this point have the one. Nobody else is
[35:22]
you know
[35:24]
Mark has reached out uh he talked to a
[35:26]
gentleman and he said he was coming.
[35:28]
I've not seen him, but um had um Steve
[35:32]
Dazar also talked with a couple people
[35:35]
and they said, "Yep, yep, yep." And
[35:37]
nobody showed up. Um this is
[35:42]
uh Mike at Skuon or however you say
[35:45]
that. He did say that uh I know here we
[35:48]
said we get a contract, but he said,
[35:50]
"You know what? I'm going to wait till
[35:51]
the UR says go ahead." That way it's not
[35:53]
like, "Well, here's my contract waved in
[35:55]
front of you." So he said once there's
[35:57]
approval then he'll send a contract and
[35:59]
then we can sign everything. Um but like
[36:01]
he said he's going to keep it fair
[36:02]
throughout. If somebody else wants to
[36:03]
bid on it, bid on it. But this is 3
[36:06]
months now we've had it open and we
[36:08]
still haven't got anybody committed to
[36:10]
come take a look. And I'm not sure why.
[36:13]
So
[36:14]
» What's his bid?
[36:16]
» What's that?
[36:16]
» How much?
[36:17]
» Uh his bid was just under 70,000.
[36:20]
» 65880.
[36:21]
» 65880.
[36:25]
So, where it gets a little different,
[36:26]
you know, um it's a 7in pad, 5,500 PSI,
[36:31]
so that's where the cost really goes up.
[36:33]
Um
[36:35]
the weight of the trucks are not getting
[36:37]
any lighter. So, that's why that
[36:39]
concrete expense is so high.
[36:55]
I'll make a motion uh [clears throat]
[36:57]
toward
[36:59]
the uh project to is it school own
[37:07]
is it award the contract or is it accept
[37:10]
the bid
[37:11]
» At this point it'll be accept the bid I
[37:13]
believe right you don't have a contract
[37:15]
in front of us
[37:16]
» Well so you all can accept the bid
[37:19]
tonight and close the bidding on this
[37:21]
project and then you'll have to you
[37:24]
approve the contract to award it and
[37:25]
that would be at the next uh UR meeting.
[37:28]
» Okay,
[37:28]
» Let's accept the bid.
[37:30]
» All right. Uh I move to accept the bid
[37:33]
from Scooon uh contracting uh for
[37:39]
» 65880
[37:41]
» $65,880.
[37:44]
Second
[37:46]
motion in
[37:50]
All those in favor I
[37:54]
carries.
[37:56]
Uh, anything for the good of the order?