Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[4:47]
in order. Everyone, please stand and
[4:49]
recite the pledge of
[4:49]
>> allegiance
[4:52]
to the flag of the United States of
[4:55]
America and to the republic for which it
[4:58]
stands, one nation under God,
[5:01]
indivisible, with liberty and justice
[5:04]
for all.
[5:07]
Hey Ashley, can I have a roll call,
[5:09]
please?
[5:09]
>> Briggs.
[5:12]
>> Cavalier
[5:12]
>> here.
[5:13]
>> Breen last
[5:17]
>> here.
[5:18]
>> Alt.
[5:20]
>> BMA
[5:21]
>> here.
[5:22]
>> Chastel
[5:23]
>> here.
[5:24]
>> Fisher
[5:25]
>> here.
[5:26]
>> I don't think Clayton said here.
[5:29]
>> Huh?
[5:29]
>> Clayton not here. Clayton did say it
[5:33]
here. I was I didn't I put you as absent
[5:36]
because you didn't say here. Yes. So you
[5:38]
are here.
[5:39]
>> You are here.
[5:39]
>> I was just surprised because I was uh
[5:41]
looking at I was first
[5:44]
called. I'm here.
[5:45]
>> Fisher was last week. So
[5:48]
>> here comes another. [laughter]
[5:51]
And then um council member Al just
[5:54]
walked in as well too as well. So I will
[5:56]
mark her here and Briggs here.
[6:03]
Just missing is council member Breen.
[6:06]
So,
[6:06]
>> okay. [clears throat]
[6:08]
All right. It's time for the open form.
[6:10]
If anyone would like to address council
[6:12]
any issue not already on tonight's
[6:13]
agenda may come to the podium. State
[6:15]
your first last name and address,
[6:17]
please.
[6:20]
Okay. Hearing none from council
[6:23]
chambers, we'll move on. This brings us
[6:26]
to the agenda. Does anyone wish to add
[6:28]
or remove anything from tonight's
[6:30]
agenda? [clears throat]
[6:32]
Can I have a motion to approve tonight's
[6:34]
agenda?
[6:35]
>> I'll make that motion, your honor.
[6:36]
>> Second.
[6:37]
>> Leon and Henry. Thank you. Discussion
[6:41]
hearing none. Roll call, please.
[6:43]
>> Briggs.
[6:43]
>> Hi.
[6:44]
>> Cavalier.
[6:45]
>> Hi.
[6:46]
>> Plot.
[6:46]
>> Hi,
[6:47]
>> Alt.
[6:48]
>> Hi.
[6:49]
>> Hmma.
[6:50]
>> Hi.
[6:50]
>> Shastelle.
[6:51]
>> Hi.
[6:52]
>> Fisher.
[6:52]
>> I.
[6:54]
>> Okay. Motion carries. This brings us to
[6:56]
the consent agenda. Does anyone wish to
[6:58]
remove anything from the consent agenda?
[7:02]
>> [snorts]
[7:03]
>> And I have a motion to approve the
[7:05]
consent agenda. Motion by Don. Thank
[7:07]
you. Is there a second?
[7:09]
>> I'll second.
[7:10]
>> Thank you, Henry. [clears throat]
[7:12]
Roll call, please.
[7:13]
>> Wait, there's supposed to be discussion
[7:15]
after anything, right?
[7:17]
>> So, with consent, you you Well, that's
[7:19]
when you pull it. If you have a
[7:20]
discussionary item on there, if you want
[7:22]
to, you still can't discuss anything as
[7:25]
a whole. You can't
[7:26]
>> unless you pull it.
[7:27]
Yeah.
[7:28]
>> And then it goes to a regular agenda.
[7:30]
>> Yeah. So if you have a question about
[7:31]
it, you could have either emailed us or
[7:34]
called us today or um then you can bring
[7:36]
it up and pull it and have a discussion
[7:38]
on it.
[7:38]
>> It was just a clarification of something
[7:40]
that that we already talked about.
[7:42]
>> Okay. Um I guess
[7:44]
>> well our procedures are so every every
[7:47]
time we go for before we say the eyes
[7:49]
and the naz there's there's not always a small moment in there for us to
[7:56]
discuss.
[7:57]
>> Correct. Well, on the consent agenda
[7:59]
items,
[8:00]
>> consent agenda items, you pull if you
[8:02]
have further questions
[8:04]
>> individual or as open.
[8:05]
>> So, yes. So, on the regular agenda
[8:08]
items, you have discussion.
[8:11]
>> Okay. Uh, that is first and second.
[8:14]
>> Yes.
[8:16]
>> Roll call, please.
[8:17]
>> Briggs.
[8:18]
>> I.
[8:18]
>> Cavalier.
[8:19]
>> Hi.
[8:20]
>> Flat.
[8:20]
>> Hi.
[8:21]
>> Alt.
[8:21]
>> Hi.
[8:22]
>> Hmma.
[8:23]
>> Hi.
[8:23]
>> Shastell.
[8:24]
>> Hi.
[8:24]
>> Fisher.
[8:25]
>> I.
[8:26]
>> Okay. Okay, motion carries. Uh, we have
[8:28]
a public hearing tonight,
[8:30]
>> your honor. [clears throat] Item 7.01 is
[8:32]
a public hearing to consider the request
[8:34]
related to the Minnesota Investment Fund
[8:36]
myth assistant program u to Northstar
[8:39]
Lime LLC provided to Northstar LLC.
[8:44]
>> Okay. Uh to ensure everyone has fair
[8:47]
opportunity to speak, each person will
[8:49]
have the opportunity for up to three
[8:51]
minutes to provide comment. you come
[8:55]
forward. Please state your first, last
[8:56]
name, and address for the record. All
[8:59]
remarks should be directed to the
[9:00]
council and must be related to the
[9:02]
subject of this hearing.
[9:05]
Please be respectful of others. No
[9:07]
interruptions or personal attacks will
[9:09]
be permitted. When your time is up,
[9:11]
Ashley, our city clerk, kindly ask you
[9:14]
to finish your sentence so we can move
[9:16]
on to the next speaker.
[9:19]
So, I'll open this public hearing. Does
[9:21]
anyone wish to address the council? So,
[9:24]
please come to the podium. State your
[9:25]
first last name and address, please.
[9:33]
My name is Phil ShraMM. I live here in
[9:36]
Krookton, Minnesota. I am also employed
[9:39]
by Northstar Line. Uh I [snorts] serve
[9:42]
as their CFO with their company. And um
[9:46]
I would just like to just give a little
[9:48]
bit more background. Also, if there were
[9:50]
any questions in regards to um the
[9:54]
request here for an extension
[9:56]
um on uh on the compliance uh for the
[10:01]
grant as far as hiring the number of
[10:04]
employees. Uh currently on hand we have
[10:07]
17 people employed. Um two years ago
[10:10]
there were one. So uh uh we have made
[10:14]
strides in that. When we uh two years
[10:17]
ago when we applied for the loan and
[10:19]
submitted in and put a business plan in
[10:22]
um our plan was to be up to 21 people.
[10:25]
Uh it was a $15 million project and as
[10:28]
you know um those kind of sizes
[10:31]
everything goes according to plan all
[10:32]
the time. But in this case it didn't
[10:34]
quite do that. Um so uh uh we ran into
[10:38]
some issues particularly on one
[10:40]
enterprise in our company which depends
[10:43]
largely on a piece of equipment uh that
[10:45]
we purchased uh that produces biochar.
[10:49]
Uh we've run into a lot of uh challenges
[10:53]
with the operational part of that and uh
[10:56]
that has slowed our progress in being
[10:58]
able to get to where we want to be and
[11:00]
employ the people necessary to operate
[11:02]
it. So, [snorts] that's uh mainly why
[11:05]
we're at and why we're requesting an
[11:06]
extension to to hopefully uh continue to
[11:10]
build uh our company and add employees.
[11:14]
So, you you did get another new piece of
[11:16]
equipment, right?
[11:19]
Uh this uh um
[11:23]
uh we we did not purchase a new piece of
[11:25]
equipment. We're currently working with
[11:27]
the one that we have. Um the part of our
[11:31]
problem is the manufacturer went
[11:33]
bankrupt and is no more was bought out
[11:35]
by another company and we're trying to
[11:37]
work with them to uh uh
[11:41]
to to fix some of the the issues that
[11:43]
are at hand. But we're we're working on
[11:46]
doing most of that in-house. uh and um
[11:50]
currently
[11:51]
the uh the biochar industry I go in and talk
[11:58]
a lot more about it but uh essentially
[12:00]
we're looking at a different piece of
[12:02]
equipment that we may uh decide would be
[12:06]
the uh better route to go but we'll have
[12:10]
over the next few months to try to make
[12:11]
a decision on on how we want to do that
[12:14]
and and approach the issue. So we've
[12:16]
kind of just had to hold back additional
[12:19]
hiring and so forth until we kind of
[12:22]
resolve through that issue. So thank
[12:24]
you.
[12:24]
>> You had a question.
[12:25]
>> Yeah, Phil, thanks for good to see you.
[12:27]
Uh can you define biochar?
[12:30]
>> Biochar is essentially a product which
[12:33]
you sequester carbon and uh what it is it's it's a process. It's basically
[12:38]
like a big furnace that burns without
[12:40]
oxygen. You take um what they call
[12:43]
biomass. In in our case, we've been
[12:46]
using oat halls, sunflower halls. Um you
[12:49]
can also uh use wood. There's all kinds
[12:52]
of different but you burn it basically
[12:54]
at a high temperature without oxy oxygen
[12:57]
and in that chemical reaction it uh
[13:01]
basically sequesters the carbon into ash
[13:04]
and then that that ash has value. And uh
[13:08]
there are right now it's a relatively
[13:10]
new market uh with biochar and uh
[13:14]
there's people that are interested in
[13:16]
it. Um it's it's good for soil
[13:19]
amendments. It's good for filtration. It
[13:21]
has lots of uh has a a strong absorbent
[13:25]
feature that they're looking at helping
[13:26]
to absorb pollutants and waste and stuff
[13:29]
like that. So,
[13:30]
>> so, so if if the city gets funded on the
[13:33]
DNR grants to fell 100 plus ash trees,
[13:37]
are you able to use that waste product,
[13:39]
so to speak?
[13:40]
>> Yeah, I've already been talking some
[13:42]
with those that have been on the ground
[13:44]
floor trying to do grants and so forth
[13:46]
to get that up and we've been in uh
[13:49]
discussions about uh how we can be of
[13:52]
assistance in utilizing that wood waste.
[13:55]
Uh we've also talked with the forestry
[13:58]
council uh for the state of Minnesota um
[14:01]
and uh they they're just a big large
[14:04]
issue [clears throat] of trying to
[14:05]
address wood waste and stuff and so
[14:08]
that's part of another scale plan that
[14:11]
we're looking at. So [snorts]
[14:12]
>> thank you.
[14:16]
>> Any further questions?
[14:19]
Thank you Phil.
[14:20]
>> Okay.
[14:23]
Anyone else from the chambers?
[14:30]
» May I add just to share a quick thing
[14:31]
just for clarification. We did on the
[14:33]
myth loan, it was about a $430,000 myth
[14:37]
loan. And uh part of that was a $100,000
[14:41]
grant if we reach that uh employment
[14:44]
level of 21 people. And that's the part
[14:47]
that we're asking extension on is that
[14:50]
$100,000 forgivable portion of the line.
[14:53]
Correct.
[14:53]
>> Okay. Thank you.
[14:55]
>> How long would the extension be before
[14:57]
>> one year?
[15:01]
» Anyone is else wish to address council
[15:06]
» hearing? None. I'll close this public
[15:08]
hearing.
[15:11]
Okay.
[15:14]
Uh no regular agenda items tonight.
[15:19]
Uh we'll go to council reports. Darren,
[15:22]
please.
[15:23]
>> You I did attach my report, but I'd also
[15:25]
just want to again thank Taylor and
[15:28]
Kenan for all the hard work that went
[15:29]
into organizing, advertising, and
[15:31]
setting up the Krookton Connected event.
[15:34]
Uh I think the event was a huge success.
[15:37]
Very happy with the number of people
[15:38]
that attended. So again, thank you for
[15:40]
all the hard work that you put into
[15:41]
that.
[15:43]
>> That's all, your honor.
[15:44]
>> Thank you.
[15:47]
>> Uh Wendy, anything?
[15:49]
>> Um the same thing. It was a great event.
[15:51]
Good job to Keenan and Taylor for
[15:54]
putting that together. Awesome. Fun to
[15:56]
get out and and mingle with their
[15:58]
community members.
[16:00]
That is it for me for now.
[16:02]
>> Thank you, Delane.
[16:03]
>> Yeah, same thing. Great event. I think
[16:05]
it's something we can continue to build
[16:06]
on in the future. So, just glad to be
[16:10]
there.
[16:11]
>> Thank you, Don.
[16:14]
>> You like I'd like to thank uh Kenan for
[16:17]
the job you did. We had a lot of people
[16:19]
there and that we don't see very often.
[16:23]
Good conversations and uh about the
[16:26]
council and also the city. Thank you
[16:29]
very much. Appreciate it.
[16:32]
>> Thank you, Don Clayton.
[16:35]
>> Same as the others. Otherwise, I don't
[16:38]
have anything else.
[16:39]
>> Thank you, Henry.
[16:40]
>> Yeah, good job. Kenan and Taylor and
[16:43]
Michelle and Chris were also there and
[16:46]
did a really good job with their stuff
[16:47]
as well. Just that's all I got.
[16:50]
>> Thank you, Joseph.
[16:52]
>> Yeah, it's a it's a ditto. I I'm glad
[16:54]
you mentioned Michelle. She was an
[16:56]
important part of that as well. Um it's interesting. It's not just having
[17:01]
the small conversations, but having
[17:02]
something really impactful coming out of
[17:04]
that. Um, and I and I think I had a
[17:07]
number of different
[17:09]
small discussions with people and I
[17:11]
think there's going to be some positive
[17:12]
light coming out of that. Also wanted to
[17:14]
say uh kudos to the people who are
[17:15]
moving snow. Uh, it's been really
[17:17]
important lately. um uh they're so good
[17:20]
at it [laughter] and um but I'm also
[17:23]
getting calls uh that that that they're
[17:25]
so good at it sometimes they're
[17:27]
injecting snow
[17:29]
above and on people's um vehicles and uh
[17:34]
places where they've already cleared the
[17:35]
sidewalk. So um so it's it's like great
[17:39]
job but it's hard to please everyone I
[17:42]
would say. Um and then my other
[17:45]
announcement would be question earlier.
[17:47]
I thought we had already discussed and
[17:49]
voted on um the people on the boards and
[17:53]
the excuse me on the committees and so
[17:55]
on. Um so I was surprised that we saw it
[17:57]
again. Maybe we had just discussed it
[17:59]
but we didn't actually vote on it.
[18:01]
>> There was just one additional person.
[18:03]
>> Yeah, that was at the ways and means for
[18:06]
June Dinarki that is going on our IRP.
[18:13]
So,
[18:13]
>> so we formalize it again,
[18:15]
>> right?
[18:16]
>> Okay. Thank you.
[18:17]
>> Starts at ways and means and then it has
[18:19]
to be formalized at the council meeting.
[18:22]
>> Thank you for that.
[18:24]
>> That's it for me.
[18:25]
>> Thank you,
[18:26]
>> Morgan.
[18:28]
>> Uh, nothing different than everyone else
[18:30]
has said. Just thank you for everyone
[18:31]
that was involved in the event. It went
[18:34]
really good. I had a great time.
[18:36]
Hopefully, we can do it again.
[18:38]
>> Thank you, Morgan. Yeah, kudos to what
[18:40]
everyone said and also uh probably
[18:43]
missed some people, but with Phil there
[18:45]
and Shannon and the displays and the
[18:49]
knowledge that everybody had.
[18:52]
Um same with Teresa from our housing and
[18:57]
uh Tiana. So, it was a great event. It
[19:00]
was a nice turnout for
[19:04]
as cold as it was. So, I think we can
[19:07]
build from it. Kian, thank you. Tan
[19:09]
Taylor, she's not here, but thank you.
[19:13]
Uh, that is all I have. So, uh, just a
[19:16]
reminder, we do have a ways and means
[19:18]
meeting tonight. So, nothing else come
[19:20]
before council. We are adjourned. Thank
[19:22]
you everybody.
[25:50]
committee meeting to order for Monday,
[25:52]
February 2nd, 2026.
[25:54]
Uh we've got three items on the agenda.
[25:59]
We start with the West Central Regional
[26:01]
Water District presentation. This would
[26:05]
be Lucas
[26:13]
and Stephen from AE2s.
[26:16]
>> Yeah. No, good evening everyone. Uh just
[26:19]
wanted to um introduce Lucas Spaith with
[26:22]
West Central Regional Water District. Uh
[26:25]
I happen to be the engineer for both the
[26:27]
city of Krookton and West Central. Um so
[26:32]
I've been meaning to get the two groups
[26:34]
together for a long time. I think
[26:36]
there's some kind of good things coming
[26:38]
um and it could be a good complimentary
[26:40]
relationship in the future. So um as
[26:43]
discussion happens and uh Lucas goes
[26:46]
through the presentation um I'm here to
[26:49]
add color commentary basically if
[26:51]
questions arise from both sides. So with
[26:54]
that I'll turn it over to Lucas.
[26:56]
>> All right. Thank you for being here.
[26:59]
>> No, if you want to just say next slide.
[27:01]
Okay.
[27:02]
>> Well good evening. Uh appreciate your
[27:04]
time this evening. Again, my name is
[27:05]
Lucas Faith. [clears throat] I am the
[27:08]
superintendent of utilities for the city
[27:09]
of Hollstead. Small community
[27:12]
[clears throat]
[27:12]
to the south here about 30 miles. Um I
[27:16]
do appreciate your time, council and
[27:18]
mayor. Um what we're doing, um so I'm
[27:22]
the superintendent there, but I'm also
[27:23]
appointed as a board a board of board
[27:26]
director for the West Central Regional
[27:28]
Water District. It is a threecount
[27:31]
board set up to to deliver um and um
[27:35]
purchase and deliver rural water um to
[27:38]
small communities, large communities um
[27:41]
and rural residents.
[27:43]
[clears throat]
[27:44]
Um so what it is if you I think you guys
[27:47]
maybe received these beforehand um but
[27:49]
the it's it's a true regional approach.
[27:52]
the three counties, you know, including
[27:54]
Pulk, Norman, and uh Klay County, um
[27:58]
decided after, you know, some time of of
[28:00]
going through this that this this looked
[28:02]
like a a real good way to serve rural
[28:05]
customers, but also the the communities
[28:07]
that are involved with it uh um with
[28:09]
different different sorts of needs that
[28:11]
I'll I'll kind of touch base on um in as I go along here. But as you can see
[28:16]
just kind of the the color comment of
[28:19]
the of the picture here you know it's showing you know egg egg farmland
[28:23]
um small cities large cities um
[28:26]
definitely less infrastructure uh
[28:28]
according to like you know water
[28:30]
treatment what you know what wells maybe
[28:33]
are are needed um the ability to find
[28:36]
wells um those sorts of things. So, so
[28:38]
the regional approach uh really
[28:40]
resonated with the county boards. Um
[28:42]
after quite a few meetings with them, we
[28:44]
had we had some conversations with um I
[28:47]
think we at least had at least three
[28:48]
meetings with each county board and in
[28:51]
the [clears throat] in the process of
[28:52]
kind of developing this.
[28:55]
Um [clears throat]
[28:57]
so, as you can see in your packet, um
[29:01]
there's a lot of reasons for for for
[29:03]
this to to work out well. these small
[29:06]
communities um have have issues finding
[29:10]
operators. They have issues, you know,
[29:12]
putting reinvestment into into their
[29:14]
existing infrastructure uh where maybe
[29:16]
their rates aren't aren't properly
[29:18]
aligned with, you know, what they need
[29:19]
for the future or even in the past. Um
[29:23]
it allows for um you know, this allows
[29:26]
to kind of work with with a bigger
[29:29]
group. that, you know, the counties are appoint they appoint the the board
[29:33]
of directors, but they also um Yes, sir.
[29:37]
>> I'm getting lost a little bit. Can you
[29:38]
describe exactly what what what it is
[29:41]
that you're representing here? This is a
[29:42]
regional approach to water. What what
[29:44]
exactly do you mean by this?
[29:46]
>> Uh it's a platable water system. So once
[29:48]
we're actually going through a state
[29:50]
statute to be established as a water
[29:51]
district, and it'll be very similar to municipal or city water, but it'll be
[29:56]
distributed through three counties.
[30:00]
So by vehicle, not by pipes.
[30:02]
>> This will be all be by pipes.
[30:03]
>> By pipes. Yes.
[30:05]
>> Y mean these great distances. Okay.
[30:08]
>> Yep. So in consideration um North Dakota
[30:11]
actually has about 90% of their the
[30:13]
state is covered by rural water and so
[30:16]
and it's all pipeline. So they've installed enough water line to
[30:21]
serve rural and then other communities.
[30:24]
Willist would be a good example of how
[30:25]
it really expanded really quickly and they had to put a big larger
[30:29]
investment into it. You know, North
[30:31]
Dakota actually, you know, they've got a
[30:33]
little bit they've got what they call
[30:35]
legacy funds. So, they have some money
[30:37]
that the the state continues to put in
[30:39]
to their infrastructure and it is um
[30:42]
water is included in in that
[30:44]
infrastructure that that that they can
[30:46]
continue to do. a small town like Park
[30:48]
River, you know, they actually, you
[30:49]
know, have their treatment plant and
[30:51]
they supply some out into the into the
[30:53]
rural and then there's other other areas
[30:56]
where um small communities are they you
[30:58]
don't see a water tower in our town
[31:00]
because they're served by rural water um
[31:03]
directly. So
[31:04]
>> the source in North Dakota is the
[31:05]
Missouri River, right?
[31:09]
>> Well, it varies. Uh there are surface
[31:13]
water plants throughout scattered
[31:14]
throughout North Dakota. some of the
[31:15]
Missouri River. Um, cities like Grand
[31:18]
Forks, Fargo get their water out of the
[31:20]
Red Lip River, Red Lake River. Uh, a lot
[31:22]
of the water districts actually get
[31:24]
their water from, uh, aquafers and
[31:27]
groundwater. So, uh, Williston's is that
[31:30]
Lucas mentioned, um, that comes from a
[31:33]
surface water. So, it it kind of depends
[31:36]
where you're at.
[31:42]
» Good questions. Um, we can go on to the
[31:45]
next slide.
[31:48]
Um, like I mentioned, there's three it's three counties that appointed the
[31:51]
boards. It was based on population. So,
[31:53]
Kurtson was actually put into um their
[31:56]
population was put into it with PK
[31:58]
County um at least um as as we sit right
[32:02]
now eventually. You know, that could change one way or the other.
[32:06]
Um but PK County has four
[32:07]
representatives on the West Central
[32:09]
board um including two county
[32:12]
commissioners. And then Norman County
[32:14]
has two um directors on the on the
[32:16]
board, one one county commissioner and
[32:18]
myself. And then Klay County has three
[32:21]
um directors on the board, including two
[32:24]
county commissioners. So they have they
[32:26]
the county commission has got some
[32:27]
oversight on, you know, how they want
[32:28]
this established, you know, what the
[32:30]
process is involved with the policy
[32:33]
making um as as we continue to go
[32:37]
forward. Um we are the first water
[32:39]
district that will be formed since the
[32:41]
mid80s. Uh so engineering and legal fees
[32:46]
have u been strenuous uh at least. Uh
[32:50]
we've we've kind of had to rewrite
[32:53]
[clears throat] a a law that was written
[32:55]
in the late '7s. U not really rewrite
[32:58]
reread it and and uh and u figure out
[33:02]
what it means. Anyway, so um we are in
[33:05]
the process of that. In uh April 17th,
[33:08]
we will be um having um our final
[33:11]
[clears throat] court hearing which I'll
[33:13]
touch on a little bit here a little bit.
[33:15]
Evolution of the of the boundaries. So
[33:17]
the city of Climax actually served by
[33:18]
Royal Water right now. It's served by
[33:20]
East Central Regional Water District,
[33:22]
which is on the North Dakota side of of
[33:25]
the Red River val or the Red River. And
[33:27]
they um they've been getting served I
[33:30]
think it's about 3 years now. Um, and so
[33:32]
they'll be taking their water tower
[33:34]
down, which I' I've heard that they'll I
[33:36]
don't have my director from there, but
[33:38]
he's got the old Krooksson water tower
[33:40]
that stands in climax if you guys didn't
[33:42]
know that. So, he's [clears throat]
[33:43]
willing to give give it back. [laughter]
[33:48]
Um, so I just yeah, just kind of some
[33:50]
commentary there. Um so Climax has
[33:53]
served um right now the engineers have
[33:55]
recognized a uh a pipeline project
[33:58]
number one phase one we're calling it.
[34:00]
Um it's a highway 75 corridor. It is
[34:03]
climax. So it goes from PK county all
[34:05]
the way through Norman County into Klay
[34:07]
County. It serves I think eight
[34:09]
different communities in project one and
[34:12]
uh we are in the process of uh you know
[34:15]
looking for state funding and I'll touch
[34:17]
on that on the next slide here.
[34:26]
So, right now, um, we've expended about
[34:30]
$3.2 million in development and design
[34:35]
and getting through this court process
[34:37]
to become a water district. Uh, we've
[34:40]
had many meetings with different city
[34:42]
councils, um, small, large. Um, I've
[34:45]
been to East Grand Forks and u we've met
[34:48]
with uh um many of them. Okay, that's
[34:51]
the slide I was looking for.
[34:55]
[clears throat]
[34:56]
>> Sorry, my slides are jumping around.
[34:59]
>> You want to go up to that colored one?
[35:01]
>> Y, please.
[35:03]
[snorts]
[35:04]
>> Thank you.
[35:06]
Um,
[35:08]
so as you can see the different colors
[35:10]
there. engineering um which you you guys
[35:12]
know Stephen um they've recognized um
[35:15]
close to 16 different kind of buildouts
[35:18]
that we would perceive this uh going
[35:21]
with um as you can see Krookxton is kind
[35:23]
of on the edge of of two different ones
[35:26]
um where the real rural consumers would
[35:30]
benefit from um you know connections
[35:34]
into existing water systems um we've met
[35:37]
with um East Grand Forks Grand Forks,
[35:41]
East Central Rural Water, Cask Row
[35:43]
Water, City of Fargo, City of Morehead,
[35:46]
um City of Barnesville,
[35:48]
City of Holly, City of Fost,
[35:51]
um
[35:53]
Southeast Water Users District, which is
[35:55]
the is the the uh south um west
[36:00]
southeast corner of North Dakota. Um but
[36:03]
we've recognized them as as potential um
[36:06]
suppliers of water and Ken would be one
[36:09]
of those potential suppliers of water
[36:11]
based on um your capacity to um supply
[36:15]
water from Aquafer your capacity to u to
[36:20]
run it through your existing plant. This
[36:23]
water district does not um intend to to
[36:27]
build a water plant at this point. Uh it
[36:30]
makes it more economical for us to we
[36:33]
think it'll be more economical to
[36:35]
purchase water from existing facilities.
[36:37]
It it improves our economics. It
[36:40]
improves um you know the the economics
[36:43]
for each larger water system. If you can
[36:46]
supply water up to uh 25 million gallons
[36:49]
a year or or maybe it's 100 million
[36:51]
gallons a year uh that are purchased
[36:54]
back from an existing water plant and
[36:56]
then we can build build pipeline um as things grow and as you can see
[37:02]
there's you know if there's 16 different
[37:03]
phases we have many many years of
[37:07]
growing.
[37:08]
So, so what's the difference between
[37:10]
what which what you're proposing and
[37:12]
this a Marshall Pulk rough water is that
[37:15]
would that is that similar?
[37:17]
>> Yeah, it's very similar. Yep. Marshall
[37:19]
Pulk um serves Marshall and Pulk
[37:22]
counties. Um we've approached them for
[37:25]
water supply as well in into our our
[37:29]
existing.
[37:30]
>> Um they don't have a lot of water. We I
[37:33]
guess um when our counties formed it,
[37:36]
Marshall Pulk wasn't necessarily
[37:39]
interested in in expanding into Norman
[37:42]
and and Clay counties.
[37:44]
>> Okay.
[37:46]
>> So, but but yes, exactly the same. I
[37:48]
think there's only f there's there's
[37:50]
five existing water districts in in
[37:53]
Minnesota. Um and and they're in the
[37:56]
north northwest and the southwest
[37:59]
including you know like parts of them
[38:01]
are even purchasers of the Louiswis and
[38:03]
Clark um water system which is
[38:07]
13 13 states
[38:10]
>> uh like 13 cities
[38:11]
>> 13 cities.
[38:14]
>> I got a quick question. Let's say
[38:15]
Krookxen is a whole supply and water,
[38:20]
rural water. Um
[38:23]
does that put a strain on our water
[38:25]
plant where we have to
[38:27]
>> you're so the one of the reasons why
[38:30]
Krookton was evaluated
[38:32]
uh for a long-term water supplier is we
[38:36]
had looked at you know who has that
[38:38]
large infrastructure in place with
[38:40]
likely excess capacity as kind of our
[38:43]
first goaround. Um, and Krookton's plant
[38:47]
actually is only running at about a
[38:49]
quarter of its capacity currently. Uh,
[38:52]
so your water plant actually has
[38:53]
sufficient capacity um to build out um
[38:57]
and add more without adding a whole lot
[38:59]
of infrastructure needs. Um, the
[39:02]
long-term question with the city of
[39:03]
Krookton though is, you know, the
[39:05]
strength of your well fields and water
[39:07]
supply. um which is why the city's
[39:10]
undergoing another study right now
[39:12]
that's going to help kind of inform some
[39:14]
of these next steps and long-term
[39:18]
um decision- making for the city. So
[39:22]
>> So go ahead. Sorry.
[39:24]
>> So they the DNR who or engineers whoever
[39:28]
would be looking at our wells.
[39:32]
>> Yep. depending on how much they would
[39:33]
look at how much extra, say if this
[39:36]
district was looking to um buy from the
[39:39]
city of Krookton, you know, the DNR
[39:41]
would want to know how much, you know,
[39:43]
what's it going to look like? Um and
[39:45]
then alternatively, if for some reason
[39:48]
an industry came in and the city of
[39:50]
Krooksen wanted to buy for some reason,
[39:52]
there's the potential for that as well.
[39:54]
So
[39:56]
>> the users are we talking primarily about
[39:59]
agricultural areas or are we talking
[40:01]
about other cities outside? How do you
[40:03]
how are you defining rural users of the
[40:06]
water that exits here?
[40:08]
>> Who's mainly going to be using that
[40:09]
water?
[40:12]
>> Uh so it it would be both. It it would
[40:16]
be both. Um like city of Climax right
[40:18]
now is purchasing water from a rural
[40:20]
water district. Um, City of Hollstead
[40:22]
where I am at, we're in the process of
[40:23]
financing um kind of a water access
[40:26]
charge to buy in access into the into
[40:28]
the North Dakota facilities so that we
[40:31]
can have water supply. Um, so each
[40:34]
community it it really helps with like
[40:37]
kind of getting the communities
[40:38]
involved. Well, you know what I'm
[40:39]
getting at though. I'm talking about So,
[40:40]
you have agricultural areas which use a
[40:43]
whole lot more water than than than we
[40:46]
are an agricultural area than than a a
[40:50]
Would you be asking like livestock
[40:51]
[clears throat] and like um irrigation
[40:54]
pivots? Is that kind of what you're
[40:55]
asking?
[40:56]
>> Yeah. Well, well, it could be um
[41:00]
we all eat, we depend on farms. I don't
[41:02]
I'm just trying to get a sense of you
[41:03]
have a farm area, real area that will
[41:06]
either have animals or just growing
[41:09]
crops and both use a lot of water.
[41:11]
>> And would they would they be able to use
[41:13]
for water?
[41:14]
>> Um I I think we would develop it for for
[41:18]
the the livestock, but not definitely we
[41:21]
could we couldn't build it big enough
[41:23]
for for for you know watering watering
[41:26]
fields. So then I was I was I was
[41:28]
thinking along those lines and then have
[41:29]
you done an assessment then of how much
[41:31]
water that takes?
[41:31]
>> You know they'd all want at the same
[41:33]
time
[41:33]
>> versus I mean I mean you look at the
[41:35]
Aala aquifer, right? And that's too many
[41:37]
straws going to the same and the water
[41:39]
levels are going down, right? And so now
[41:41]
they're have to change their farming
[41:43]
methods because of that.
[41:44]
>> Yeah.
[41:44]
>> I'm not saying this is going to do that.
[41:46]
I'm just wondering if you're doing the
[41:47]
calculations to figure out what the need
[41:49]
is because it's really about two things
[41:51]
for water, right? It's it's quality and
[41:53]
quantity. you have the right quality and
[41:55]
you have enough water,
[41:56]
>> right?
[41:57]
>> Clearly you have enough water because
[41:58]
you're giving a nice presentation saying
[42:00]
that we have water to go elsewhere,
[42:02]
>> which is great. Um, so anyway, have you
[42:04]
done the calculation to see how much
[42:07]
what what the potential users are going
[42:09]
to need versus what we have? You said
[42:10]
that we're at 25% capacity right now.
[42:14]
>> So, what would this what would this
[42:15]
bring us up to then?
[42:18]
>> Yeah, I I'll
[42:20]
touch on that quick. So the uh the
[42:23]
entire region, the 3count region, 30
[42:26]
cities, all the rural residents,
[42:28]
um looking at a projected use of about
[42:32]
1.6 billion gallons long-term. That's
[42:35]
just what all that's what the current
[42:37]
use is
[42:38]
times 25 years uh or not times 25 years,
[42:42]
in 25 years using uh population trends
[42:46]
and growth. what we had kind of planned
[42:49]
for in our initial uh master plan and
[42:52]
rural hookups and municipal hookups
[42:54]
looking for an annual water use of about
[42:57]
8 to 900 million gallons is kind of what
[42:59]
we're uh basing our current models on uh
[43:03]
based on the S or the interest we've
[43:05]
seen to date
[43:07]
>> gallons what's the unit time
[43:09]
>> million gallons per year
[43:10]
>> per year.
[43:10]
>> Yep. So, uh, to put that in perspective,
[43:13]
the city of Krookton, uh, uses on
[43:16]
average from 310 to 350 million gallons
[43:19]
per year. Um, so, uh, just a couple
[43:22]
times time or couple times the size of
[43:26]
the city of Krookton. Um, and the
[43:29]
thought would be that there'll be likely
[43:31]
be multiple water sources uh throughout
[43:34]
this district. So, um, as far as demands
[43:37]
solicited from the city itself, that
[43:40]
would be kind of ongoing future
[43:42]
discussions, I would say, of, uh, what
[43:44]
could possibly come from here versus
[43:47]
North Dakota versus
[43:50]
Morehead, East Grand Forks, wherever. So
[43:54]
>> yeah, we've we've recognized kind of our
[43:56]
initial buildout being with East
[43:59]
[clears throat] Central Rural Water for the first phase and of course that's
[44:03]
that Highway 75 corridor um south south
[44:06]
of Krookton um where um it would make
[44:10]
sense for us to either you know pipe
[44:12]
those together eventually and if if
[44:15]
Krookson was you know a supplier or East
[44:17]
Grand Forks was a supplier that we would
[44:19]
have multiple supplies for redundancy,
[44:22]
but also, you know, looping similar to
[44:24]
what a city does have that we have the
[44:26]
ability to move water. I mean, it's been
[44:28]
a big lift for A2S to try to develop
[44:32]
kind of a master plan that might take 20
[44:35]
years to build out. Obviously, we know
[44:36]
when the master plan comes out, it's a
[44:38]
little bit different within minutes or
[44:41]
hours.
[44:42]
>> Can you go back to Delane's question too
[44:44]
about the source of water here? Can you
[44:45]
explain a little bit more about our
[44:47]
source water here that we got into
[44:50]
>> yours? Well, I can tell you what I know
[44:52]
about your source water, but that's the
[44:53]
DNR is a little bit concerned concerned
[44:56]
to us with us approaching you guys
[44:58]
because of your aquifer. so that having
[45:00]
your wellfield uh study done um makes
[45:04]
sense that you would need to know that
[45:06]
before you could ever ever think about
[45:09]
selling water to a to another entity,
[45:12]
especially that one that was going to
[45:13]
use, you know,
[45:15]
>> recently had a large business
[45:17]
[clears throat] that was
[45:19]
possibly coming into our community and
[45:21]
there was some concerns at that time
[45:24]
>> just to just uh just to have enough
[45:27]
water just for that one business. let
[45:29]
alone a tri-state area. So that the
[45:32]
amount of water coming out of our
[45:34]
aquifer kind of concerns me a little
[45:36]
bit.
[45:36]
>> Wasn't that like a quarter million
[45:38]
gallons a year for that one business
[45:40]
alone?
[45:41]
>> I think wasn't it something like that?
[45:42]
>> I think so. Something like that.
[45:43]
>> Okay.
[45:45]
>> And that was a concern at the time
[45:47]
>> to supply that in addition, you know,
[45:49]
that was one year.
[45:50]
>> Yeah.
[45:50]
>> In addition to
[45:52]
>> But I think to studies will show
[45:54]
>> right before that even came a reality
[45:57]
too. I know the DNR and the watershed
[45:59]
were going to do studies to see if the
[46:01]
capacity
[46:02]
>> did we had some studies done though, did
[46:04]
we? I mean,
[46:05]
>> I don't think it was really in depth yet
[46:07]
cuz we
[46:08]
>> Brandon had some studies done maybe. I I thought
[46:13]
before Brandon left there was some
[46:15]
studies that were done. I thought we
[46:17]
paid for a study.
[46:19]
>> You uh the city still has a phase two
[46:21]
study ongoing with bar engineering. Um,
[46:25]
so you should see actually a draft of
[46:27]
that in the next couple months, I think
[46:28]
was their last report. So, um, that'll
[46:32]
help influence a lot of city kind of
[46:34]
decision making and next steps on
[46:36]
anything in the future, whether it be a
[46:39]
district like this or industry coming in
[46:41]
or so,
[46:42]
>> um, you name it. A question I have, and
[46:44]
I apologize if you're going to get to it
[46:46]
later, if we if we do get into a
[46:48]
contract, are we are we tied into that
[46:51]
contract if um for gallons of water per
[46:53]
year?
[46:55]
I mean, is there is there any um so like
[46:58]
say we get a dry year and our our our
[47:00]
aquifers, our our wells are running low,
[47:03]
but we have to commit to you guys x
[47:06]
amount of gallons of water
[47:08]
per year. Are we tied to that then? I
[47:11]
mean somewhat, but that would be, you
[47:14]
know, a drought situation where um, you
[47:17]
know, I would assume Krookton and West
[47:20]
Central all would be doing, you know,
[47:22]
their drought prepare or, you know,
[47:24]
going through the drought preparedness
[47:26]
um where, you know, you would shut off
[47:28]
industry. We would shut off any kind of
[47:30]
industry. We had those sorts of things,
[47:32]
you know, kind of a step stepping stone
[47:34]
down. That's how that's how most you
[47:36]
know drought preparedness plans are are
[47:39]
right now is that you would shut down
[47:42]
you know your your you know your your
[47:44]
first tier would get shut down then your
[47:45]
second tier and then your third tier
[47:47]
where and then you know it
[47:49]
>> sure mean it's a regional drought that
[47:52]
could be just a drought um that covers
[47:55]
just our aquifers and our wells. I mean,
[47:58]
we've had issues where we've got
[48:00]
involved in other communities and just
[48:02]
seem to have any issues. So, in that
[48:05]
situation, what would happen?
[48:08]
Well, that is that's that's concerning
[48:10]
that that that if that is possible. I
[48:13]
think the well field, you know, your
[48:16]
wellfield um study, your your step two
[48:19]
of that um should be able to alleviate
[48:23]
some of those concerns that the DNR
[48:24]
might have um or or else or else
[48:28]
strengthen their concerns uh about your
[48:31]
ability to serve more than what you you
[48:34]
currently have. So I mean it that's
[48:38]
pretty important to us that you guys
[48:39]
know what you can supply so that there
[48:42]
wouldn't be this hey we we we're not
[48:45]
sure it's dry you know you know what the
[48:50]
farmers took all the water out of the
[48:51]
aquifer and now we don't have the water
[48:53]
we can to serve you know the actual
[48:55]
people that need it for the drinking
[48:57]
water.
[48:59]
>> Okay.
[49:01]
You didn't talk much about the arsenic
[49:03]
contamination in private wells, but you
[49:06]
said 43% in your presentation. 43%
[49:09]
Norman County, which is that%
[49:12]
[clears throat]
[49:12]
43% Norman County has that problem or
[49:15]
that's some data that engineering pulled
[49:17]
off of the MDH website. [snorts]
[49:21]
Um, and and so it would be a
[49:22]
representative sample, not that every
[49:24]
not that 100% of the wells have been
[49:26]
sampled, but the of the ones that were
[49:28]
sampled, it was the 43%. So of of the
[49:32]
samples that they had, no matter what
[49:33]
number it was, 43% of those you had 40
[49:36]
if you had 100 wells, you're saying 43
[49:39]
of those wells in Norman County that
[49:41]
were tested have a high arsenic level.
[49:44]
Yeah. Right.
[49:45]
>> Above the above the state minimum.
[49:49]
>> Thank you.
[49:53]
Well, I'll
[49:53]
>> I'll try to be brief on the rest of this
[49:55]
here. [clears throat] Go to [snorts] the
[49:58]
next slide.
[50:00]
Um okay. So today um the West Central
[50:04]
District um is formed by resolution.
[50:07]
We're a legal entity. We're not a public
[50:10]
water system. Um we have a petition with
[50:13]
the district court which is also is in
[50:15]
Klay County District Court. Um that was
[50:18]
kind of worked out between the um county
[50:21]
administrators and the county um the
[50:24]
county board members that are on our
[50:25]
board to do it through Klay County. So
[50:28]
on April 17th, we will be having our
[50:30]
final hearing. That final hearing
[50:33]
[clears throat] allows the West Central
[50:35]
Water District to become become a water
[50:37]
district and to um be um eligible for
[50:42]
state funding to be eligible for, you
[50:45]
know, similar similar funds that city or county would get through um tax
[50:50]
dollars um through the state. And then
[50:54]
um
[50:57]
well with that I better I need to touch
[50:59]
on this. We have 19,500 mailers going
[51:02]
out and your city residents will be part
[51:05]
of that as part of the statute. Um it's
[51:08]
mandatory that we send those out. Um so
[51:10]
we have met with Mr. Getsman about this
[51:14]
uh kind of made him aware of it. Uh we think that they'll become lots of
[51:19]
questions and it'll probably come to the
[51:21]
locals and then probably go well above
[51:24]
us and go into the Minnesota Department
[51:26]
of Health. Um so we're trying to be
[51:28]
upfront um getting this information out.
[51:31]
I I think Mr. Gatman just told me that
[51:33]
he received the letter from us um today.
[51:36]
So I'm sure you'll see a copy of that in
[51:39]
um shortly, right? Yeah.
[51:43]
Um, but so you'll you'll receive a
[51:45]
letter from West Central Regional Water
[51:47]
District stating, you know, our our
[51:49]
[snorts] intentions, which is what I'm
[51:51]
here to try to explain as well. And then
[51:54]
we will uh your residents will also be
[51:56]
receiving that or or your land any land
[51:59]
owner in Krookton. I believe that that
[52:02]
could be somewhat helpful maybe for the
[52:04]
city of Krookton. We're we're willing to
[52:06]
share information. So with that, if
[52:08]
there's surveys that come back, they're
[52:09]
inside the city limits. you might get,
[52:12]
you know, a free survey out of uh out
[52:14]
[clears throat] of our out of our our
[52:18]
mandatory court court filings. So, in
[52:22]
your packet also, there's um
[52:26]
next slide here.
[52:29]
Here's the public notice. Um it has
[52:33]
what we're doing. Um your residents do
[52:36]
not need to show up for the court
[52:38]
hearing. It is strictly a hearing. the
[52:40]
judge will not make a ruling that day,
[52:42]
but if there is, you know, people
[52:45]
proponents for it or people against the
[52:47]
water district, um, they are welcome to
[52:50]
come and make comment. I believe
[52:52]
there'll also be a Zoom option. So, if
[52:55]
you're interested and you're sitting at
[52:57]
your desk and you want to watch on the
[52:59]
17th, uh, Mr. Slick will actually be
[53:02]
presenting
[53:04]
the good portion of that of that
[53:06]
presentation to the judge. Um in our
[53:10]
packet, you'll also have the frequ
[53:11]
frequently asked questions. So we've um
[53:14]
we've been at this for a couple of years
[53:16]
now. We uh definitely have um a few, you
[53:20]
know, pre pre-baked answers to some of
[53:22]
these questions. Um but the roundabout
[53:26]
way of it is, you know, it is it's
[53:28]
pipeline. We're bringing potable water
[53:30]
to some of those wells that don't, you
[53:32]
know, have arsenic issues. There is
[53:34]
there's people in in in rural areas that
[53:36]
haul water still at this point in time
[53:39]
because they can't find viable water. I
[53:41]
mean, even flowing water uh in some
[53:44]
cases. [snorts]
[53:45]
So, um it's been recognized that this is
[53:48]
a good project. We've had really good
[53:49]
success. We've met with you know about
[53:51]
12 different cities that have signed
[53:53]
what we call memorandum of inclusions
[53:56]
but it's a memorandum of understanding
[53:58]
saying that we we we want to be planned
[54:01]
for. So that's how this has expanded um
[54:04]
you know down up and down Highway 9 up
[54:06]
and down Highway 75 and we've just kind
[54:08]
of started from the North Dakota border
[54:11]
and uh been working our way out. So,
[54:13]
we're trying we've we've mailed out to
[54:15]
all the city councils in the in the
[54:18]
three county area and um all of the land
[54:22]
owners in the area will soon receive
[54:24]
something from Klay County District
[54:26]
Court asking or or telling them about
[54:28]
the hearing.
[54:30]
So,
[54:32]
your frequently asked questions are in
[54:34]
your packet as well. Do you guys have
[54:40]
anything more? Mr.
[54:42]
What's it what's in person's benefit to
[54:45]
do this?
[54:47]
Um well so if you were to use your
[54:50]
existing infrastructure and this is what
[54:52]
I've told some of the other um larger
[54:54]
public water systems like if you can use
[54:57]
that to its most economic benefit you
[54:59]
know like the life of the you have the
[55:01]
life of your plant and you put that
[55:02]
investment in but if you can really
[55:04]
optimize what you're what you're
[55:06]
producing out of it and then make you
[55:08]
know a little bit extra on it you like
[55:10]
so you have a margin on what you at
[55:13]
least I assume you would have a margin
[55:14]
on the water that you sell to your
[55:16]
existing
[55:18]
constituents in in your community. Um
[55:20]
but you would have an an additional
[55:22]
margin on top of that that now you can
[55:25]
you know put put away for the next plant
[55:27]
or put away for different
[55:29]
infrastructure.
[55:30]
>> Sell the water to you.
[55:32]
>> Yes.
[55:33]
>> Who who dictates how much we can sell
[55:34]
the water to you or
[55:36]
>> we get to negotiate. [clears throat]
[55:38]
[laughter]
[55:40]
>> So it's not a set price that we have to
[55:42]
abide by,
[55:43]
>> right? We'll be looking for the most
[55:44]
economical way to serve our our
[55:46]
consumers as well. So, I mean it'll be,
[55:49]
you know, a way that, you know, try to
[55:51]
optimize, you know, existing
[55:53]
infrastructure, but also finding the
[55:55]
best deal and we want quality water. I
[55:57]
mean,
[55:58]
>> so can you give me an example of a
[56:00]
community that's already doing this and
[56:02]
how much that um how much they're
[56:05]
bringing in a year roughly? I mean, is
[56:07]
it um
[56:09]
is it is it a million? Is it 500,000? Is
[56:12]
it?
[56:13]
>> Oh, you'd have a
[56:16]
Oh, I don't have I don't I don't we
[56:19]
don't have any communities that are
[56:21]
actually selling to us right now. And we don't we don't we we don't have a
[56:24]
purchase agreement with anyone or or a
[56:26]
water access charge. Um but I I would
[56:29]
say it's somewhere around that, you
[56:31]
know, $2 per thousand maybe that they're
[56:34]
bringing in. But, you know, that's
[56:37]
there's a a margin error there, too. So,
[56:39]
you're probably in the 3 to 5% margin.
[56:41]
So, if your operations, if your all-in
[56:44]
operations and maintenance, you know, is
[56:46]
$5 per thousand and you're selling it at
[56:48]
$6 per thousand, that's in in in in the
[56:51]
utility world, that's a decent margin,
[56:53]
right? So, maybe it's only if you're
[56:55]
producing it at five and you have maybe
[56:58]
existing or future capital investment in
[57:00]
that. You might be able to sell it for
[57:02]
$5.50 50 cents and that 50 cents is your
[57:04]
margin where you're it's a 10% margin on
[57:07]
top of you know what you're existing or
[57:10]
you're doing it right now just
[57:13]
generically.
[57:16]
So, so in that negotiation, that
[57:18]
contract, um, then I would I would I
[57:21]
would think you you you would also say
[57:23]
if we did have a difficult year, that
[57:26]
something in there would be written to
[57:27]
say city of Krookton still gets their
[57:30]
water, right, to to do all the things
[57:32]
that they need to do if that's agreed
[57:35]
upon ahead of time such that everyone
[57:37]
who comes to the table understands that.
[57:39]
Um,
[57:40]
>> yeah,
[57:42]
>> right. Because they go sour pretty
[57:43]
quickly. I um a couple other questions.
[57:46]
Where is um Warren Standle? Because he's
[57:49]
Poke County representative, right?
[57:50]
>> Yes.
[57:52]
>> That's not you.
[57:54]
>> You're Lucas. Right.
[57:55]
>> Right. So, I'm asking where is Warren,
[57:58]
>> Mr. Strandel. Um I don't remember what
[58:00]
he had going on. Um
[58:04]
>> Okay. [snorts] Just just because
[58:06]
>> where we are, right?
[58:08]
>> Right. Great. Nice that he'd be here.
[58:11]
It's his neck of the woods. Now, can you
[58:13]
tell us a little bit more about your
[58:14]
funding, the backers? [snorts]
[58:15]
So, it's $3.2
[58:17]
three and a quarter million dollars
[58:19]
local project funding. Who
[58:21]
>> who's backing this again? Where's the
[58:22]
money coming from? So, the three
[58:24]
counties, um, they put the original
[58:26]
budget up of $500,000,
[58:29]
um, to go through the formation process,
[58:31]
do the the preliminary design, and then,
[58:35]
um, along the way, I'm not exactly sure,
[58:40]
>> along the way, um, the pole cwell, the
[58:43]
city of Climax decided to hook up to
[58:45]
regional water to kind of start this
[58:47]
process.
[58:49]
um about a $2.1 million from off the top
[58:52]
of my head uh grant loan funding package
[58:55]
was secured through the USDA. Um and
[58:57]
then in the time while that pipeline was
[59:00]
[snorts] being built uh designed and
[59:03]
then the inception of this district kind
[59:04]
of concurrently happened uh PK County
[59:07]
contributed another um just shy of
[59:10]
$600,000 in ARPA funds as well to upsize
[59:13]
the physical infrastructure uh in order
[59:16]
to serve a broader area within Pulk
[59:19]
Norman and Klay County.
[59:20]
>> So I'm hearing grants and counties
[59:22]
cities but no corporations. No, no. It's
[59:26]
all state, federal, local seeking.
[59:31]
>> Thank you. Now clarify.
[59:32]
>> There is a different operation that's
[59:34]
going in North Dakota that may help with
[59:37]
a connection
[59:38]
our direction
[59:40]
um Riverview Dairy if you're familiar.
[59:43]
Um they're out of Morris, Minnesota, but
[59:45]
they build large 25,000 cows [snorts]
[59:50]
operation.
[59:52]
um and and they need water, but that is
[59:54]
on the North Dakota side. Um there's two of them going in on the
[59:58]
North Dakota side. Um also, we've
[1:00:00]
secured um through Senator Clolobashar
[1:00:03]
um she secured 1.75 million for the for
[1:00:06]
Norman County and then also 1.75 million
[1:00:09]
for Felton um that we are currently in
[1:00:12]
the process of working through with EPA
[1:00:14]
on our on our budget. Um but those those
[1:00:17]
funds should be released um hopefully in
[1:00:19]
the next 40 45 days or so that we can
[1:00:22]
start expending some of those dollars
[1:00:24]
for the final design and then
[1:00:27]
infrastructure.
[1:00:29]
One other so like as like like some
[1:00:32]
small cities as they finance things
[1:00:34]
through like USDA or um um you know
[1:00:38]
through PPL the PPL list that uh like
[1:00:43]
city of Hallid is a good example and I I live this every day but um so
[1:00:48]
we're trying to secure $3.2 million and
[1:00:50]
most of it's for water access charge so
[1:00:53]
that the North Dakota side of things can
[1:00:55]
get built out. It'll be owned by the
[1:00:56]
North Dakota side of things and then
[1:00:58]
West Central will actually take over on
[1:01:01]
the Minnesota side to serve the city of
[1:01:03]
Hallstead, but it will be a H Hallstead
[1:01:05]
kind of funded um project, but in that same in the opposite of what we
[1:01:11]
could do is that we could build a new
[1:01:13]
plant for about $3.5 million and then we
[1:01:16]
have, you know, the same same aquifer,
[1:01:19]
same well, same everything and then but
[1:01:22]
we have a new plant. And um as far as my
[1:01:25]
council is concerned, they'd rather have
[1:01:26]
better quality water and and kind of go
[1:01:29]
with the pipeline project.
[1:01:32]
>> Thank you for indulging us.
[1:01:34]
>> You're you're very welcome. Anytime.
[1:01:36]
[laughter]
[1:01:37]
[snorts]
[1:01:39]
>> Any other questions for Lucas?
[1:01:43]
» Thank you for your Thank you for your
[1:01:45]
time, Stephen. Thank you.
[1:01:46]
>> Yeah, thank you.
[1:01:49]
>> If you have any questions, you know to
[1:01:50]
file me.
[1:01:54]
Okay, moving on. Uh, discussion
[1:01:56]
regarding the Tri Valley Grant.
[1:02:00]
Yes, sir. I'll keep I'll try to keep
[1:02:02]
these short, get this out of here in a
[1:02:05]
relatively short period. Um, so, uh, in
[1:02:07]
the original deed redevelopment grant
[1:02:09]
request, uh, that was proposed to
[1:02:10]
council on January 20th, original grant
[1:02:13]
amount was for $650,000.
[1:02:16]
Uh, that deed redevelopment grant is a
[1:02:18]
50% match. So meaning at that time the
[1:02:21]
city would have been responsible for
[1:02:22]
$325,000
[1:02:24]
if awarded that grant. Um the original
[1:02:28]
grant request of $650,000 was
[1:02:30]
anticipating the approximate cost to
[1:02:32]
demo and redevelop that property. Um
[1:02:35]
that number um to my knowledge was
[1:02:37]
estimated from speaking with contractors
[1:02:40]
um back in like 2024.
[1:02:43]
So, in an attempt to obtain an updated
[1:02:45]
demo cost as required by this uh deed
[1:02:48]
grant, uh the city asked AE2s to provide
[1:02:51]
an estimate just to uh try to get us
[1:02:53]
closer on what that cost may u be. And
[1:02:57]
according to AE2S, the demo costs were
[1:02:59]
estimated at approximately, and these
[1:03:00]
are all approximate. So, uh don't hold
[1:03:02]
this for anything more than what it is,
[1:03:04]
but just over $1.3 million. Um, and this
[1:03:07]
estimate does not include uh any
[1:03:10]
infrastructure anticipated to be
[1:03:11]
incorporated with the highway 2 uh
[1:03:13]
reconstruct project. Uh, doesn't include
[1:03:16]
any tipping fees or disposal fees and
[1:03:19]
does not include any uh temporary
[1:03:21]
shoring related to any basement or
[1:03:23]
foundation removal uh if needed. So, it
[1:03:26]
it's it's not likely. It's it's a known
[1:03:28]
that the demo costs are going to likely
[1:03:30]
exceed that $1.3 million.
[1:03:34]
So after receiving this update
[1:03:36]
information, uh Taylor and I had further
[1:03:38]
discussion and she informed me that uh
[1:03:40]
in relation to this project uh that that
[1:03:44]
we could increase that grant amount uh
[1:03:46]
to the for this project up to $984,000.
[1:03:51]
Again, based on on the engineering uh
[1:03:54]
demo cost that we received. And again,
[1:03:57]
uh the numbers, uh for this grant, they
[1:04:00]
wouldn't include engineering, any
[1:04:01]
contingencies, permitting, um and and a
[1:04:04]
few other things. Um so, if we were
[1:04:07]
awarded uh this grant for $984,000,
[1:04:11]
again, it would be a 50% match. The city
[1:04:14]
would be responsible for uh just over
[1:04:16]
$492,000.
[1:04:18]
Um so given that the grant application
[1:04:20]
was February 1st um prior to any council
[1:04:23]
meetings u I did authorize Taylor to
[1:04:25]
increase that amount from 650,000 to
[1:04:28]
984.
[1:04:30]
Um, so again, if the project costs are
[1:04:33]
similar to AE2S's
[1:04:36]
estimates, uh, we awarded this grant
[1:04:39]
from deed increasing that amount to
[1:04:40]
984,000.
[1:04:42]
The city would be responsible for about
[1:04:45]
$866,000.
[1:04:48]
Uh, notification if we do receive the
[1:04:50]
grant would be approximately 6 to8
[1:04:51]
weeks. So, we'd hope to hopefully to
[1:04:54]
hear something in April. Uh however,
[1:04:56]
just given the timeline and everything,
[1:04:58]
I'm not sure how competitive we will be
[1:04:59]
on this grant given some of the
[1:05:01]
requirements. Um so if we don't receive
[1:05:04]
the grant, um
[1:05:07]
the next opportunity to apply for this
[1:05:09]
grant would be August 1st, which would
[1:05:12]
be too late to have the building
[1:05:13]
demolished in 2026 or before any of the
[1:05:17]
uh 2027 DOT Highway 2 reconstruct
[1:05:21]
projects. So, um, again, we've had some
[1:05:24]
meetings with A2S. We're currently
[1:05:26]
working with them to draft and we will
[1:05:27]
be publishing an RFP for the demo
[1:05:29]
project. Uh, but regardless if we
[1:05:32]
receive the grant or not, uh, we are
[1:05:34]
going to have to demo that building in
[1:05:36]
2026.
[1:05:38]
Um, so that means that, uh, we would
[1:05:41]
likely have to include the demo cost of
[1:05:43]
Tri Valley into a bond. Um we're
[1:05:47]
actually meeting a few of us are meeting
[1:05:49]
with Ellers on Monday the 9th to discuss
[1:05:52]
bonding for the industrial park. We'll
[1:05:54]
also be discussing or I'll bring up you
[1:05:56]
know options or or ideas for bonding for
[1:05:58]
the Tri Valley project. So again, this
[1:06:01]
is uh just more discussion uh
[1:06:04]
informative to just let council know
[1:06:07]
that we did increase the grant amount
[1:06:09]
and that um unless there's other
[1:06:12]
directions, we are likely going to have
[1:06:13]
to demo that project or that building. I can tell you um A2S, myself, Mr.
[1:06:19]
Gatsman and uh Matt Upgrren from
[1:06:22]
Minnesota DOT who is leading that
[1:06:24]
Highway 2 reconstruct project. [snorts]
[1:06:27]
We did meet last week and uh we
[1:06:29]
discussed the the options of what if we
[1:06:32]
didn't uh tear down Tri Valley and what
[1:06:34]
if we did and you know uh Mindot is
[1:06:38]
confident in their design that if the
[1:06:39]
building was there um that semi- traffic
[1:06:43]
and and vehicle traffic would be able to
[1:06:45]
make that turn on that intersection.
[1:06:47]
However, if the building was removed,
[1:06:50]
they would look at likely uh purchasing
[1:06:53]
some of that property and recessing that
[1:06:55]
intersection and and making more room
[1:06:57]
for pedestrians. As we know, it's with
[1:06:59]
that building there, it's a very tight
[1:07:01]
intersection for pedestrians to stand on
[1:07:03]
that corner and wait and monitor for
[1:07:05]
traffic. So, um you know, that
[1:07:08]
discussion went on as as we do have time
[1:07:11]
even though the plans now I think we're
[1:07:12]
coming up to 60% on that highway to
[1:07:14]
reconstruct. Uh however, talking to Matt
[1:07:17]
and A2S, I mean um you know, if it was
[1:07:20]
decided to take this building down in
[1:07:22]
2026, which we're fairly confident we
[1:07:24]
can do, um you know, they would redesign
[1:07:26]
that intersection to accommodate for
[1:07:29]
that. Uh again, maybe recess it back,
[1:07:32]
have some more room for pedestrians to
[1:07:34]
stand there while they're waiting for uh
[1:07:36]
traffic. So, um,
[1:07:40]
again, just wanted to inform council
[1:07:41]
that the numbers are obviously more than
[1:07:44]
double what we maybe originally
[1:07:45]
anticipated and kind of what again,
[1:07:48]
unless there's any other direction on
[1:07:49]
that building, what what we would like
[1:07:50]
to move forward with uh as a city and
[1:07:53]
how that looks and of course there'll be
[1:07:55]
much more discussion to come in front of
[1:07:56]
council with bonding and other amounts
[1:07:58]
like that.
[1:07:59]
>> More the more we delay it, then it gets
[1:08:01]
more expensive each time we start the
[1:08:03]
process again. Right.
[1:08:04]
>> It does. And if we don't get this grant,
[1:08:06]
like I said, the next opportunity we
[1:08:08]
would have to apply for it is in August.
[1:08:09]
And um you know, that would just we
[1:08:11]
wouldn't have any summer left to to take
[1:08:13]
this building down.
[1:08:14]
>> Um you know, and the whole idea or plan
[1:08:16]
would be to remove that building this
[1:08:19]
summer so that it's you know, obviously
[1:08:21]
gone and ready for next year, 2027, when
[1:08:25]
we uh start that Highway 2 reconstruct
[1:08:27]
project. So
[1:08:28]
>> how how will we sew off in that
[1:08:30]
estimate?
[1:08:32]
You know, those are just the numbers
[1:08:33]
that I received from u prior staff.
[1:08:36]
[snorts]
[1:08:36]
I'm not uh um talking or getting some
[1:08:40]
numbers from other contractors, but
[1:08:41]
again, those numbers were old. Um AE2s,
[1:08:44]
uh they're a great firm to work with. Um
[1:08:46]
they included, you know, all the
[1:08:48]
necessary things that were maybe
[1:08:49]
overlooked. They've compared it to
[1:08:51]
several buildings in our region or area
[1:08:52]
that have been torn down about similar
[1:08:54]
size. Uh, you know, there's some other
[1:08:56]
factors that were maybe overlooked as
[1:08:57]
far as possible historical value of that
[1:09:00]
building and what we'd have to do to
[1:09:01]
accomplish that to tear it down. Um,
[1:09:05]
just a much more detailed likely um,
[1:09:08]
realistic bid that we would be looking
[1:09:10]
at.
[1:09:10]
>> The person that was gathering that bid
[1:09:12]
did not use
[1:09:13]
>> excuse me,
[1:09:14]
>> the person that had gathered that bid
[1:09:15]
for us before did not use
[1:09:17]
[clears throat]
[1:09:18]
to get that information. It's It's
[1:09:19]
likely things were overlooked
[1:09:21]
>> and and I don't think uh they included
[1:09:24]
[clears throat] they were just looking
[1:09:25]
at demo of the building that not
[1:09:27]
including the tipping fees.
[1:09:30]
>> Well, this this is not including tipping
[1:09:32]
fees either.
[1:09:33]
>> So, that 1.3 estimate is not including
[1:09:37]
tipping fees.
[1:09:40]
>> Any idea how much tipping fees are,
[1:09:42]
Stephen?
[1:09:43]
>> I mean, Walmart [clears throat]
[1:09:45]
it could go as high as 100 grand
[1:09:47]
possibly. Um some of the next steps that
[1:09:52]
uh we had kind of thought and discussing
[1:09:54]
with Darren and um last week is uh I
[1:09:59]
think it would be kind of at this point
[1:10:01]
it would make a lot of sense to do um a
[1:10:04]
little bit more thorough cost estimate
[1:10:05]
now that we have a little bit of time um
[1:10:08]
walk through the building. We got the
[1:10:10]
architectural plans today, see how much
[1:10:11]
mass is there. Um, and just do a little
[1:10:14]
bit more factf finding to kind of help
[1:10:16]
shore up that cost a little bit, too.
[1:10:19]
>> So, you recommend we should have done
[1:10:20]
that before and come to you guys with a
[1:10:22]
lot more time for you to do that?
[1:10:24]
>> It it would have been helpful, but um
[1:10:26]
yeah, that that just wasn't time audit.
[1:10:28]
That's kind of some numbers we had
[1:10:30]
pulled off of some uh historical
[1:10:33]
tearowns in the Red River Valley that we
[1:10:35]
had just um been a part of. So,
[1:10:37]
>> are there any materials in the building
[1:10:39]
that could be sold such as copper or
[1:10:42]
>> I don't know,
[1:10:43]
>> you know, sometimes uh and Stephen can
[1:10:45]
lightly, but sometimes depending on the
[1:10:48]
contract they would hire to demo that
[1:10:50]
that's taken into account and sometimes
[1:10:52]
is, you know, reduced from the amount of
[1:10:54]
demo as they would get that, you know,
[1:10:56]
as far as they could recycle or use that
[1:10:58]
for some other purposes.
[1:11:01]
>> Is that listed under historic?
[1:11:03]
>> I believe it is.
[1:11:06]
We're checking into that. But again, we were talking about this last week. I
[1:11:10]
think
[1:11:11]
>> again, don't quote us on the years, but
[1:11:12]
it isn't anything prior to 1960ish.
[1:11:15]
>> It uh I did a find that out Friday. So,
[1:11:19]
um if it's over 50 years old, that's
[1:11:20]
considered historic.
[1:11:22]
>> Uh so, I actually have meeting lined up
[1:11:25]
with a couple architectural historians
[1:11:28]
to kind of figure out what those steps
[1:11:30]
look like. Um, sometimes what you'll
[1:11:34]
have to do is [clears throat] maybe put
[1:11:35]
together a video of the building or a
[1:11:38]
plaque there or something. Uh, there'll
[1:11:41]
just be a little bit of factf fighting
[1:11:42]
that we have to do with them as well.
[1:11:44]
So, um, we'll have more details in the
[1:11:47]
coming week on that.
[1:11:48]
>> I like what you said because you said 50
[1:11:50]
and since I'm over 50, I'm historic.
[1:11:53]
[laughter]
[1:11:55]
» You get a plaque.
[1:11:57]
Um, so, so I, you know, I came into this
[1:12:00]
late, obviously everyone else here has
[1:12:02]
been, uh, discussing this for some time.
[1:12:05]
I I I assume that that although I'm
[1:12:08]
never supposed to assume, but I'm going
[1:12:10]
to assume that that this is really about
[1:12:14]
safety
[1:12:15]
and that and and that [clears throat]
[1:12:18]
the other side of not tearing it down,
[1:12:20]
it was looked into to see was there a
[1:12:22]
way to keep that building and still make
[1:12:24]
it safe place when people exit or
[1:12:27]
walking down that sidewalk. That was
[1:12:28]
looked into. Right. Were there any other
[1:12:31]
possibilities of not tearing the
[1:12:32]
building down? We have had a few
[1:12:35]
>> p that way for people walking in that
[1:12:37]
area.
[1:12:37]
>> We have had some people approach us and
[1:12:40]
some interest in possibly purchasing
[1:12:41]
that building and redeveloping it into
[1:12:43]
housing or something else. Um but you
[1:12:46]
know given the the the studies that you
[1:12:48]
know Minnesota DOT has done and deemed
[1:12:50]
that intersection critical and given the
[1:12:52]
space I think it would be in our best
[1:12:54]
interest to remove that building to gain
[1:12:57]
that access for pedestrians and and for
[1:12:59]
the intersection for turning of semis.
[1:13:01]
Um, I mean they're they're confident in
[1:13:03]
their designs that they could move
[1:13:04]
forward as is with that building there.
[1:13:07]
Again, it just restricts that
[1:13:08]
intersection to about six or eight feet
[1:13:11]
for pedestrians to stand there.
[1:13:13]
>> So, I don't know if I answered your
[1:13:14]
question, but
[1:13:17]
>> just
[1:13:17]
>> exactly [clears throat]
[1:13:19]
I'm sorry. So, go ahead.
[1:13:21]
>> I mean, they they did do that build out
[1:13:22]
there and they've done things to like
[1:13:25]
try to make it safer and I mean, and it
[1:13:28]
didn't work.
[1:13:29]
>> Yeah. And so I guess when when it's that
[1:13:31]
expensive then you're forced to relook
[1:13:33]
at okay do I but if it's a safety is
[1:13:36]
it's sort of this okay
[1:13:37]
>> that is that it would be that's the
[1:13:39]
primary reason or I guess the primary
[1:13:41]
purpose of tearing that building down
[1:13:43]
would be for safety for pedestrians and you know for motorists to be able to
[1:13:48]
safely turn at that intersection
[1:13:50]
specifically semis because remember the
[1:13:52]
highway 2 reconstruct project they are
[1:13:54]
you know reducing to two lanes and
[1:13:55]
expanding the sidewalks and a bike lane
[1:13:58]
which will narrow that intersection for
[1:14:00]
turning for larger vehicles like semis.
[1:14:04]
>> So, what's it look like for
[1:14:07]
bonding for that for our yearly um
[1:14:12]
I mean I know you got some other stuff
[1:14:13]
you want to bond for, but I mean
[1:14:16]
>> we're going to try to get the big
[1:14:17]
picture as far as bonding at least for
[1:14:19]
this year. You know, we have the
[1:14:20]
industrial park, we'd have Tri Valley to
[1:14:22]
worry about that would be likely 2026
[1:14:25]
bonding. There's been talk about doing,
[1:14:27]
you know, temporary bonds until we're done with the Highway 2
[1:14:30]
reconstruct project uh and then rolling
[1:14:32]
them into a general obligation bond. Uh
[1:14:35]
I don't know all the answers for that.
[1:14:36]
Like I said, we're meeting on Monday to
[1:14:37]
discuss that further. Um you know,
[1:14:39]
however, if we uh you know, temporary
[1:14:41]
bond you make only interest payments on.
[1:14:43]
Uh temporary bond is typically up to
[1:14:45]
three years, which can be extended for
[1:14:46]
another three years if needed. Um, if we
[1:14:49]
just elected to go right into a general
[1:14:50]
obligation bond, year one of 2027 would
[1:14:54]
be an interest payment and then moving
[1:14:56]
forward would be the actual payments
[1:14:58]
roughly easy math to get ballpark on the
[1:15:00]
payment amount which again know that
[1:15:02]
dollar amount is about 8% of that's
[1:15:04]
going to be your annual payment for
[1:15:05]
that.
[1:15:07]
you know, is that something we can
[1:15:08]
swing, do you think, as as a city, with
[1:15:10]
all of our other challenges that we
[1:15:12]
have? And,
[1:15:13]
>> you know, like [snorts] like we've
[1:15:14]
discussed earlier in budget season and
[1:15:15]
that with these projects coming forward,
[1:15:17]
there's going to have to be some serious
[1:15:18]
discussions in 2027, moving forward on
[1:15:21]
operational costs and and services we
[1:15:24]
provide to make sure we can accommodate
[1:15:25]
all that. We could likely be looking for
[1:15:28]
um you know, 27 and beyond uh bond
[1:15:30]
projects of you know, 250 plus thousand
[1:15:33]
a year in bond payments if not. I mean,
[1:15:34]
is it and I know some of this is hard,
[1:15:36]
but is it possible once we decide to go
[1:15:41]
if we go forward with this, we get a a
[1:15:44]
kind of a firm number on how much our
[1:15:46]
how much we'll be bonding and how much
[1:15:48]
of that's we're going to have to pay
[1:15:50]
yearly? I mean, can is that something
[1:15:52]
that can happen when we decide this?
[1:15:54]
>> Yeah, absolutely. We would have a
[1:15:55]
structure that would be provided on
[1:15:57]
exactly what that would look like
[1:15:58]
>> and then what you know and after getting
[1:16:00]
that then we as a group can decide you
[1:16:02]
know what what does that look like for
[1:16:03]
our
[1:16:04]
>> absolutely
[1:16:05]
>> they would have an they would have a
[1:16:06]
percentage amorization schedule
[1:16:08]
everything they're showing council
[1:16:09]
before they move forward. Absolutely.
[1:16:16]
my my concern about selling uh you know
[1:16:20]
if there was a someone interested in
[1:16:21]
buying a Tri Valley building and they
[1:16:24]
purchase it, how long are they going to
[1:16:26]
sit on it to repurpose it? I mean, we've
[1:16:29]
got a few of those buildings in Krookson
[1:16:32]
already that
[1:16:34]
>> Well, like like you said, if somebody
[1:16:36]
buys it for housing now, we probably got
[1:16:39]
a bunch more people down there in a
[1:16:40]
dangerous intersection going in and out
[1:16:43]
of there. That's probably not helping
[1:16:44]
the situation as far as safety.
[1:16:47]
>> True. So I I I just I just look at the
[1:16:50]
history of our some of our older
[1:16:52]
buildings in Krookton that are purchased
[1:16:55]
by individuals and they got grand ideas
[1:16:57]
and they never come to fruition. So
[1:17:01]
that's my issue that that was part of
[1:17:03]
the reason u prior to the prior
[1:17:06]
community development director leaving
[1:17:07]
on trying to do a downtown tiff district
[1:17:10]
for the downtown Krookton and add it up
[1:17:12]
through Tri Valley. Obviously,
[1:17:13]
incentives for current business owners
[1:17:15]
or ones that are looking to establish
[1:17:17]
business in Krookton and also for that
[1:17:19]
property um if someone part of the grant
[1:17:22]
requirements would be that someone if we
[1:17:25]
get a grant for Tri Valley that a
[1:17:26]
developer would have to come in there
[1:17:27]
and develop that property or build
[1:17:29]
something on there. Um you know, a tiff
[1:17:32]
district would help with that. However,
[1:17:34]
if they didn't within 5 years, this is
[1:17:36]
other reasons why this grant is maybe
[1:17:38]
not a good fit for us. We're not sure
[1:17:39]
yet. if if someone didn't build or
[1:17:42]
develop that property within 5 years,
[1:17:43]
we'd owe the full amount of the grant
[1:17:45]
back also. So, not saying it wouldn't
[1:17:48]
happen, but there are like anything,
[1:17:49]
there's contingencies or risks with
[1:17:51]
anything we do.
[1:17:56]
» A lot to absorb. Anything else on this
[1:17:59]
discussion?
[1:18:01]
>> Just like I said, I'll keep you informed
[1:18:03]
as we go forward. I just want to be as
[1:18:04]
upfront with you, council, and
[1:18:06]
everything that we're doing as we move
[1:18:07]
forward. So, thank you.
[1:18:08]
>> Thank you. Thank you. [clears throat]
[1:18:12]
>> All right, one more uh cheetah
[1:18:13]
discussion.
[1:18:15]
>> Okay, again, thank you, your honor. Um,
[1:18:17]
so yeah, I just want to discuss with
[1:18:18]
council what I'm proposing
[1:18:20]
reorganization of the housing and
[1:18:22]
crooken community development positions.
[1:18:25]
Um, I presented this plan to the cheetah
[1:18:27]
board on January 7 or 27th at their last
[1:18:31]
board meeting and it was very
[1:18:32]
wellreceived.
[1:18:34]
Um again just a little history uh with
[1:18:37]
some of the problems that have occurred
[1:18:39]
um in the past under the current
[1:18:41]
organizational structure. Um you know
[1:18:44]
prior to um Carrie being hired as
[1:18:47]
community development director uh if
[1:18:49]
council remembers maybe some Robert
[1:18:51]
Barnes served as a community development
[1:18:53]
director and executive director of
[1:18:56]
Cheetah. Um again Robert did have
[1:18:59]
extensive experience in community
[1:19:01]
development. However, um learning or as
[1:19:03]
time went on, uh that he had to also
[1:19:06]
serve as the executive director
[1:19:07]
overseeing housing. Uh he ultimately
[1:19:10]
elected to resign his position. Uh in
[1:19:13]
the absence of a community development
[1:19:15]
director, uh city administrator Corpy
[1:19:17]
Reynolds served as the executive
[1:19:19]
director for eight months uh prior to
[1:19:22]
Carrie being hired. Um when Carrie was
[1:19:25]
hired by the city as community
[1:19:27]
development director, she also served as
[1:19:29]
the executive director of Cheetah and
[1:19:31]
appointed Terresa Taran um as the
[1:19:34]
Krookton housing director shortly after
[1:19:37]
um she was hired by the city of
[1:19:38]
Krookton. As time went on, u there
[1:19:41]
became several concern uh concerning
[1:19:43]
staffing issues between housing and the
[1:19:45]
executive director which created
[1:19:47]
difficult working environment
[1:19:49]
[clears throat]
[1:19:49]
>> and lack of communication between staff.
[1:19:52]
uh these staffing issues continued for
[1:19:54]
an extended period of time and were not
[1:19:57]
uh resolved during the prior community
[1:19:59]
development director's tenure. Um I did
[1:20:02]
introduce this plan to the prior
[1:20:03]
community development director. Uh but
[1:20:05]
then again after learning of uh they
[1:20:08]
would be resigning their position, I
[1:20:10]
decided to wait before moving forward
[1:20:11]
with this plan. Um so like I said as I
[1:20:15]
stated there's been a strain
[1:20:16]
relationship in housing and the
[1:20:18]
community and prior community of
[1:20:19]
development directors uh and the strain
[1:20:22]
relation relationship between prior
[1:20:25]
community development directors and past
[1:20:26]
city administrators. So uh I I think
[1:20:29]
past has shown that the current
[1:20:30]
structure between housing and community
[1:20:31]
development hasn't been working and that
[1:20:34]
something needs to be changed moving
[1:20:35]
forward. So what I'm proposing is to
[1:20:37]
revise the job descriptions of the
[1:20:39]
community development director and the
[1:20:41]
housing director. So the community
[1:20:43]
development director job description
[1:20:44]
would stay very similar uh to what it is
[1:20:47]
except uh the executive director title
[1:20:49]
of cheetah would be removed from that
[1:20:52]
job description. Uh the community
[1:20:54]
development director would still oversee
[1:20:55]
the community development city budget
[1:20:58]
and they would oversee the EDA or
[1:21:00]
cheetah budget. uh community development
[1:21:02]
director would uh be a direct report to
[1:21:04]
the city administrator as they always
[1:21:06]
have been and they would continue to
[1:21:08]
work with the cheetah board on current
[1:21:10]
and future community and economic
[1:21:12]
development projects. Uh the housing
[1:21:14]
director's job description would also
[1:21:16]
have some minor revisions and moving
[1:21:18]
forward uh they would also be a direct
[1:21:22]
report to the city administrator not the
[1:21:24]
community development director. However,
[1:21:27]
to do this, um, the Cheetah bylaws would
[1:21:30]
need to be revised to state that the
[1:21:32]
executive director of Cheetah would be
[1:21:34]
the city administrator. Um, the housing
[1:21:38]
director again would continue to be
[1:21:40]
responsible for the housing budget and
[1:21:42]
they would report to the Cheetah board
[1:21:44]
as they currently do. Um
[1:21:47]
the city administrator as the executive
[1:21:49]
director Cheetah would sign off on or
[1:21:51]
approve any housing relating systems and
[1:21:54]
transfer of any funds. Um and that would
[1:21:58]
apply basically to housing or HUD. You
[1:22:00]
know, originally when I was going
[1:22:02]
through this and trying to create this
[1:22:03]
plan, I wanted to eliminate the
[1:22:05]
executive uh director title completely.
[1:22:08]
However, the executive director title
[1:22:10]
needs to remain in place for housing or
[1:22:13]
HUD requirements, not EDA requirements.
[1:22:16]
Um, so in summary, uh, I guess the
[1:22:18]
change that I'm looking for again is
[1:22:20]
that the community development director
[1:22:21]
and housing director would report to the
[1:22:23]
city administrator and they would each
[1:22:25]
be in charge of their respective budgets
[1:22:27]
and staff. The city administrator would
[1:22:29]
serve as the executive director of
[1:22:31]
Cheetah. U, I've spoken with Teresa and
[1:22:34]
Taylor about this extensively. They both
[1:22:37]
agree with the changes. Um, I've also
[1:22:39]
spoke with Tanner, our city attorney,
[1:22:41]
who has also consulted with Steven
[1:22:43]
Larson, um, and the League of Minnesota
[1:22:45]
Cities. There's nothing preventing us to
[1:22:48]
make this change. Um, and like I said
[1:22:51]
previously, uh,
[1:22:54]
you know, the reorganization, housing,
[1:22:56]
and community development director
[1:22:57]
positions were wellreceived by the
[1:22:59]
Cheetah board. Uh, they actually made
[1:23:01]
two motions that day. One motion to
[1:23:03]
approve the reorganization.
[1:23:05]
uh motions they made and they were both
[1:23:06]
accepted and second to appoint the city
[1:23:09]
administrator as interimm executive
[1:23:11]
director of cheetah and that's basically
[1:23:14]
to kind of keep moving forward with the
[1:23:16]
HUD requirement so we don't slow
[1:23:18]
anything down or any processes there um
[1:23:20]
so moving forward I'd be looking to
[1:23:23]
revise those job descriptions revise the
[1:23:25]
cheetah bylaws uh again to state that
[1:23:28]
the city administrator would be the
[1:23:29]
executive director of cheetah and would
[1:23:32]
present the updated bylaws uh at any
[1:23:35]
future meetings at the cheetah board and
[1:23:36]
the city council for approval. Um, and
[1:23:39]
again, I just continue to work with
[1:23:41]
Taylor and Teresa on the daily workflow
[1:23:43]
of of each of their respective
[1:23:45]
organizations and organizing that as we
[1:23:47]
move forward. So, I guess in closing,
[1:23:49]
I'm just, you know, looking for
[1:23:50]
discussion from council and again a
[1:23:52]
count consensus to hopefully support the
[1:23:55]
reorganization of these job descriptions
[1:23:57]
in cheetah.
[1:23:58]
>> So, I think I think this is a good move.
[1:24:01]
Um,
[1:24:02]
>> as many of you know, back when I first
[1:24:04]
got on the council, it was we made we
[1:24:06]
made some changes with the cheetah and
[1:24:08]
we got the the director to answer to the
[1:24:11]
city administrator. Therefore, in a
[1:24:14]
roundabout way answer to the city
[1:24:17]
residents of Krookton through us us
[1:24:20]
council members. So, I think I think
[1:24:22]
that's a good move. The thing that we
[1:24:23]
didn't we didn't finish the job. I
[1:24:27]
think we like with what Darren is
[1:24:28]
presenting here is um you know making
[1:24:31]
the the housing director report directly
[1:24:33]
to the administrator as well as the is
[1:24:36]
the um cheetah director and I think it
[1:24:38]
just it makes it everything clean at
[1:24:41]
that point.
[1:24:43]
So, as somebody on the cheetah board, um
[1:24:46]
there [snorts] has I don't know how much
[1:24:48]
everyone's been aware, but there has
[1:24:49]
been some very much confusion and
[1:24:51]
contention of who reports to who, where,
[1:24:55]
who goes to who for what, who can
[1:24:59]
oversee what. And I mean, there hasn't
[1:25:02]
been clear answers. Um there has been a
[1:25:04]
lot of back and forth over the last year
[1:25:06]
between legal, between HR, and all of
[1:25:08]
that. And there has not been a clear
[1:25:10]
answer that we can see through. this
[1:25:12]
would be a clear clean answer. It would
[1:25:15]
give a lot of clarity to everyone over
[1:25:18]
within those departments um for every
[1:25:21]
position within that department. Um we
[1:25:23]
discussed it at the last cheetah board.
[1:25:25]
Um it seemed to be a consensus there
[1:25:28]
that everyone agreed that this would be
[1:25:29]
a great move. So from that standpoint,
[1:25:32]
the cheetah board from our you know at
[1:25:35]
that time at our last meeting supported
[1:25:37]
this move also. And I think that speak
[1:25:41]
when people know who is who to speak
[1:25:44]
with and al also
[1:25:47]
cooperate with is very important. I
[1:25:50]
think this is a good plan. you know, and
[1:25:53]
I've spoken in detail with Theres also
[1:25:55]
because I didn't want to burden the city
[1:25:57]
administrator position uh with, you
[1:25:59]
know, is there an excess amount of work
[1:26:01]
that comes with this helping with
[1:26:02]
housing and uh you know, she's detailed
[1:26:05]
that list and and I've spoken in detail
[1:26:07]
and it's it's at uh you know, quarterly
[1:26:12]
uh reporting uh approving uh transfer of
[1:26:14]
funds uh maybe monthly but usually you
[1:26:16]
know quarterly um it would be part of an
[1:26:19]
email chain uh through HUD. I would
[1:26:21]
create an email account that myself,
[1:26:24]
Teresa, and Tanya could could read or
[1:26:27]
see for that communication. So, it's not overwhelming. I did speak with
[1:26:30]
Corki who did that position for about 8
[1:26:32]
months. And and again, really how it
[1:26:35]
boils down to is it's not any different
[1:26:37]
than any other department in the city of
[1:26:39]
Krookton reporting to the city
[1:26:40]
administrator. Each department head or
[1:26:42]
director is responsible for about 98% of
[1:26:44]
their budget current or or um
[1:26:47]
organization currently. their
[1:26:49]
department. You know, like anything,
[1:26:50]
there are things that city administrator
[1:26:52]
needs to sign off or and approve and and
[1:26:54]
this just really wouldn't be anything
[1:26:56]
different. You know, in speaking with uh
[1:26:58]
you know, the Josh Mack, the the
[1:27:01]
president also tried to come up with
[1:27:03]
other ideas. It's it's just impossible
[1:27:04]
for the board president or a board
[1:27:06]
member to oversee daily operations,
[1:27:08]
day-to-day operations of of housing. I
[1:27:11]
think this just provides a solution to
[1:27:13]
have a person that there's every day to
[1:27:15]
help with that and move forward. So, um,
[1:27:18]
like I said, Taylor and Teresa have been
[1:27:19]
very receptive of this. Have been
[1:27:21]
working closely with Teresa moving
[1:27:22]
forward on on getting accounts changed,
[1:27:24]
people's names on accounts and what that
[1:27:26]
looks like. So, um,
[1:27:29]
sounds [cough and clears throat] good.
[1:27:31]
Um, yeah, I think I think it's put a lot
[1:27:33]
of work into it, Darren. Um, I think
[1:27:35]
it's a good move, too. Um, separation of
[1:27:38]
duties each are in their own lane
[1:27:41]
basically and moving forward. So any
[1:27:45]
other discussion on this
[1:27:47]
>> other than I really appreciate
[1:27:49]
>> No, like I said, I appreciate that. I
[1:27:51]
will um
[1:27:52]
>> Does this need uh
[1:27:53]
>> Yeah, you I'll let you finish up if
[1:27:55]
whatever. Yep. [clears throat]
[1:27:56]
>> We need a consensus on this to and it
[1:27:58]
has to go to council for
[1:28:00]
>> Yeah, that would be if if we get
[1:28:01]
consensus on this, I will present uh it
[1:28:03]
likely won't be at the next council
[1:28:04]
meeting just because of the cheetah
[1:28:06]
bylaws. They need a 14-day notice before
[1:28:08]
any bylaws can be changed. So, it would
[1:28:10]
likely be about a month out before I'd
[1:28:12]
bring anything back. What that would
[1:28:14]
look like if there is a consensus is I
[1:28:15]
would bring back uh the amended or
[1:28:18]
revised bylaws for approval through
[1:28:20]
council and then appointing city
[1:28:22]
administrator executive director at that
[1:28:24]
time officially.
[1:28:25]
>> Okay, Mr. PL.
[1:28:26]
>> So, I am in favor.
[1:28:28]
>> Anybody in favor of this?
[1:28:30]
>> Yes.
[1:28:32]
>> Consensus is there.
[1:28:33]
>> Thank you. I'll move forward with that.
[1:28:34]
Thank you.
[1:28:35]
>> Thank you, Darren.
[1:28:38]
>> [clears throat]
[1:28:38]
>> Okay, that kind of wraps it up. If
[1:28:40]
nothing else, we are adjourned. Thank
[1:28:42]
you everybody.
[1:28:43]
>> Thank you.