Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
This transcript looks garbled at the source (not a parsing bug on our end) — treat it as approximate. You can instead.
[3:23]
We are open to the public.
[3:24]
Thank you. Let
[3:24]
s ensure that
[3:30]
Mike has gone live. Stand by.
[3:31]
Okay. We
[3:34]
re live. Thank you.
[3:36]
To order the City Council
[3:39]
meeting of AUGUST 5th, 2026. As
[3:39]
you can see, tonight
[3:40]
s council
[3:42]
meeting is being held virtually
[3:44]
due to critical maintenance and
[3:45]
upgrades underway in council
[3:47]
chambers. During the meeting,
[3:50]
we MAY take brief breaks as
[3:52]
needed to address any technical
[3:53]
issues and help ensure the
[3:55]
meeting proceeds as smoothly as
[3:58]
possible, and council. Thank
[3:59]
you so much. Please give me a
[4:01]
little grace as we start out.
[4:03]
As I get the lay of the
[4:04]
landscape here, I
[4:04]
m very
[4:06]
appreciative to former Mayor
[4:08]
Sweet having done this for
[4:09]
quite a long time, but we
[4:09]
ll
[4:11]
get through it. So, City Clerk,
[4:13]
will you please call the roll.
[4:15]
Councilmember Tim Chisholm
[4:17]
here? Council Member Arnold
[4:21]
here. Councilmember Prem here.
[4:24]
Councilmember Falcone here.
[4:25]
Councilmember Pascal.
[4:26]
Here.
[4:29]
Deputy mayor black. Here. Mayor
[4:30]
Curtis.
[4:33]
Here. All right. Our study
[4:34]
session tonight is on two
[4:35]
items. First, we
[4:36]
ll have an
[4:39]
update on the 2027 2028 utility
[4:41]
rates. Second, we will have an
[4:42]
update on the Kirkland Care
[4:43]
s
[4:46]
low income support program. We
[4:48]
expect to reconvene our regular
[4:51]
meeting at 730. Uh, city
[4:52]
manager.
[4:53]
Okay. Thank you, MADAM Mayor.
[4:55]
So we have the whole 90 minutes
[4:56]
of the study session set out
[4:58]
for these two topics. Related
[4:59]
topics? Um, I
[5:00]
ve asked everyone
[5:02]
to keep their cameras off
[5:02]
unless they
[5:03]
re speaking. Um, I
[5:04]
wanted to give a huge thanks to
[5:06]
folks at Public Works and
[5:07]
Finance to put together a lot
[5:08]
of really complicated
[5:10]
information. And also our
[5:11]
consultant team here. You
[5:11]
re
[5:12]
going to hear from who has done
[5:14]
a fabulous job, but it
[5:14]
s all
[5:15]
going to be led by Jenny
[5:16]
Garrison. Our surface water
[5:18]
strategic advisor. And she has
[5:20]
lots of help who people will
[5:22]
check in when needed. And Tracy
[5:23]
Dunlap is also here at deputy
[5:25]
city manager to chime in as
[5:26]
needed, where she is in the
[5:28]
Tri-Cities. So with that, I
[5:28]
ll
[5:30]
turn it over to Jenny.
[5:32]
Great. Thank you very much.
[5:34]
Good evening, MADAM Mayor. And
[5:36]
members of the council. Uh,
[5:36]
again, I
[5:37]
m Jenny Gauss, surface
[5:38]
water strategic advisor, and
[5:39]
I
[5:40]
m managing the utility rate
[5:44]
process for 2027, 2028. And
[5:45]
Brook is kindly running the
[5:48]
slides for me for now. Uh, next
[5:52]
slide. Um, we have a very
[5:54]
knowledgeable group of people,
[5:55]
uh, all of whom have helped to
[5:57]
develop the budget assumptions
[5:58]
and the models that are going
[6:00]
to be used to update Kirkland
[6:00]
s
[6:02]
utility rates. Uh, the fcs team
[6:04]
and myself will be the main
[6:05]
presenters. But we do have many
[6:07]
other folks standing by. Um, as
[6:11]
questions arise. Next slide.
[6:13]
And before we launch into sort
[6:14]
of the meat of the
[6:15]
presentation, I wanted to just
[6:17]
highlight some of the process
[6:18]
improvements that have happened
[6:19]
since the last rate setting
[6:21]
process. Um, we
[6:23]
re doing more
[6:24]
forecasting of revenues. Uh,
[6:25]
staff is reviewing and
[6:27]
reporting on revenue trends
[6:28]
each month so that we have the
[6:30]
most up to date information.
[6:32]
Uh, water and sewer utilities
[6:34]
have been split apart so that
[6:36]
we could better see how each is
[6:39]
faring financially. Uh, the
[6:41]
utility policy supervisor is
[6:44]
now, um, allocated to water,
[6:47]
sewer and solid waste. And then
[6:48]
we are really working on
[6:50]
prioritizing water and sewer
[6:52]
engineering and planning. And
[6:53]
so those things are really
[6:54]
going to help with the
[6:56]
transparency and accountability
[7:00]
in the process. Next slide. And
[7:03]
so, uh, tonight is the first of
[7:04]
three meetings where we
[7:04]
re
[7:06]
going to discuss utility rates
[7:07]
updates. Uh, we
[7:08]
ll be returning
[7:09]
on SEPTEMBER 15th with our
[7:11]
proposed rates. And again on
[7:13]
OCTOBER 20th with our final
[7:15]
rates. Um, tonight we have our
[7:17]
consultant team here to provide
[7:18]
background on the rate models
[7:21]
and to present the preliminary
[7:23]
rates. Um, these are rates that
[7:25]
meet our current fiscal
[7:26]
policies. Um, we
[7:27]
re also going
[7:29]
to be discussing potential ways
[7:30]
to moderate these rate
[7:31]
increases. Um, and we
[7:32]
ll see
[7:33]
council guidance on the
[7:35]
preferred rate scenario. Uh, a
[7:36]
note that I have some slides
[7:38]
available. Um, after Brooke
[7:38]
s
[7:40]
presentation, if there are
[7:41]
questions, I have a set of
[7:43]
slides that is available for us
[7:45]
to use. Um, now I
[7:46]
ll introduce,
[7:50]
um, fcs team. Um, Brooke, Tasha
[7:52]
is a project manager with scs,
[7:53]
a Bowman company. She
[7:54]
s been
[7:56]
with fcs for over ten years and
[7:57]
has performed similar rate
[7:59]
studies for many cities in the
[8:01]
Pacific Northwest. And we
[8:01]
re
[8:02]
very pleased to have her
[8:03]
managing the rate modeling
[8:05]
efforts for Kirkland. Um, with
[8:07]
her tonight is Amanda Levine,
[8:08]
who is managing the solid waste
[8:11]
elements of the process and
[8:12]
likewise has performed many
[8:14]
utility rate studies and
[8:15]
engagements over her eight
[8:17]
years with fcs. Um, together
[8:17]
they
[8:18]
ll walk us through the
[8:20]
preliminary preliminary rate
[8:22]
study results. So take it away,
[8:25]
Brooke. Thank you.
[8:27]
Perfect. All right. Uh, so
[8:28]
thank you. Jenny. As mentioned,
[8:28]
I
[8:30]
m Brooke. Tasha with fcs, and
[8:32]
I do have Amanda Levine with
[8:34]
me, as well as John Carducci.
[8:34]
Um, and we
[8:35]
re ready to just
[8:36]
walk through those preliminary
[8:37]
rates for the city
[8:38]
s forecast,
[8:40]
as well as revenue requirements
[8:40]
as what we
[8:41]
ll refer to those as
[8:42]
through the bulk of this
[8:46]
presentation. So a quick agenda
[8:47]
here. To start, we
[8:47]
re going to
[8:49]
review a brief background.
[8:49]
We
[8:50]
re going to talk more about
[8:52]
what a revenue requirement is.
[8:52]
We
[8:53]
ll review the city
[8:54]
s fiscal
[8:55]
policies and then we
[8:55]
ll talk
[8:56]
through the revenue requirement
[8:59]
results for each utility before
[9:00]
wrapping it up with next steps
[9:04]
and questions or discussion. So
[9:06]
here again just a brief
[9:07]
background for each of the
[9:08]
utilities that we
[9:08]
re going to
[9:10]
discuss this evening. First the
[9:12]
water utility and the
[9:13]
infrastructure associated with
[9:15]
the water utility is operated
[9:17]
and maintained by the city. The
[9:18]
city purchases their water
[9:20]
supply through Cascade Water
[9:22]
Alliance. Similarly for the
[9:24]
wastewater utility, the city
[9:25]
operates and maintains the
[9:27]
collection system and uses that
[9:29]
system to send wastewater to
[9:30]
King County
[9:31]
s treatment plants
[9:32]
who they pay for treatment
[9:35]
services. On the surface water
[9:36]
side, the city operates and
[9:38]
maintains the surface water
[9:39]
system, working to reduce
[9:41]
street flooding and address the
[9:43]
health of local water bodies.
[9:44]
Surface water is unique in that
[9:45]
it gets billed through the
[9:46]
county
[9:47]
s property taxes, so
[9:48]
most customers don
[9:49]
t see the
[9:51]
bill as directly. And then
[9:53]
finally, the city also provides
[9:55]
garbage, recycling and compost
[9:57]
curbside collection services
[9:59]
through waste Management, which
[10:01]
is also a contractor, and they
[10:02]
pay disposal costs to King
[10:04]
County for disposal service as
[10:08]
well. So for tonight
[10:09]
s review,
[10:09]
we
[10:10]
re going to be concentrating
[10:12]
on the revenue requirement for
[10:13]
each utility. When we talk
[10:15]
about a revenue requirement,
[10:16]
our goal is to determine the
[10:18]
overall amount of revenue
[10:20]
needed to satisfy all of the
[10:21]
fiscal obligations of each
[10:25]
utility on a standalone basis.
[10:27]
Our fiscal obligations include
[10:29]
our direct expenses. So those
[10:30]
are things like our operating
[10:32]
and maintenance costs. Any
[10:34]
existing debt service payments
[10:36]
and any new debt service
[10:37]
payments or rate funded capital
[10:38]
that
[10:39]
s needed to fund the
[10:41]
capital program. Those
[10:43]
financial obligations also
[10:45]
include indirect expenses.
[10:45]
Those are things like
[10:47]
maintaining our reserve
[10:49]
balances, as well as debt
[10:50]
service coverage ratios. If
[10:51]
we
[10:52]
re a utility that has a
[10:53]
large amount of debt, the city
[10:56]
of Kirkland is not within their
[10:59]
utilities. Currently. Um, for
[11:00]
this exercise, we compare a
[11:02]
forecast of those obligations
[11:04]
to our revenues at their
[11:06]
existing levels. First, to
[11:07]
determine whether those
[11:08]
revenues are sufficient over
[11:11]
the forecast period. And if we
[11:12]
see a forecasted deficiency
[11:14]
throughout that study period,
[11:16]
we can develop a rate plan to
[11:17]
help satisfy that deficiency,
[11:19]
while ideally trying to
[11:21]
minimize impacts to customers
[11:23]
to the extent possible. And
[11:23]
that
[11:24]
s going to be our main
[11:26]
concentration tonight. Revenue
[11:27]
requirements for each utility
[11:29]
over a multiyear period. Or in
[11:31]
other words, how much do we
[11:32]
need to potentially raise our
[11:36]
rates over that time frame? So
[11:38]
before we dive into the
[11:39]
results, we want to set the
[11:41]
stage first with a review of
[11:41]
the city
[11:43]
s financial policies.
[11:45]
Uh, these policies provide some
[11:46]
guardrails for the study to
[11:48]
help encourage consistent
[11:50]
decision making. Over time,
[11:51]
especially when we have
[11:53]
documented fiscal policies like
[11:55]
the city does. Those allow for
[11:56]
consistency, even as staff and
[11:59]
leadership changes. So first
[12:00]
here we have our working
[12:02]
capital contingency, which is
[12:03]
in place to allow the utility
[12:04]
to weather those day to day
[12:06]
cash flow fluctuations. The
[12:09]
target is 45 days of o&m for
[12:11]
water and sewer. It
[12:12]
s 100 days
[12:14]
of o&m for stormwater and 30
[12:17]
days for solid waste. We do see
[12:18]
a higher target for stormwater
[12:19]
here because it
[12:19]
s billed
[12:21]
through those property taxes
[12:22]
again, and has two larger
[12:24]
influx of revenues rather than
[12:25]
more of a steady monthly
[12:28]
stream. Uh, the water and sewer
[12:29]
utilities also have another
[12:31]
operating contingency layer.
[12:32]
It
[12:33]
s for a similar purpose to
[12:34]
help weather those cash flow
[12:36]
fluctuations. This results in
[12:39]
an additional 12% of o&m held
[12:42]
as a reserve target. Together,
[12:42]
that
[12:45]
s just about 90 days. The
[12:47]
water, sewer and surface water
[12:49]
utilities also have capital
[12:51]
contingency targets to provide
[12:53]
a source of funding for
[12:55]
emergency repairs or capital
[12:57]
cost overruns. Um, in each
[12:59]
case, that target is about 10%
[13:02]
of the six year cip program.
[13:04]
And then finally, the water,
[13:05]
sewer and surface water
[13:07]
utilities also aim to fund a
[13:09]
dedicated amount of capital
[13:11]
investment directly from rates.
[13:12]
To treat that infrastructure
[13:14]
investment like a true cost of
[13:16]
operating those utilities.
[13:19]
Water will seek to fund 125% of
[13:21]
annual depreciation costs
[13:23]
through rates. Sewer will aim
[13:25]
to fund 165% of depreciation
[13:26]
costs, and surface water will
[13:28]
seek to fund 100% of
[13:30]
depreciation. This invest the
[13:32]
system. The investment policy
[13:33]
really helps to ensure that
[13:33]
we
[13:34]
re replacing system
[13:35]
infrastructure as we
[13:35]
re using
[13:37]
it. Solid waste doesn
[13:38]
t have
[13:39]
those added capital contingency
[13:40]
or system reinvestment
[13:42]
components, since the utilities
[13:43]
largely contractual costs
[13:44]
rather than that direct
[13:48]
infrastructure investment.
[13:49]
Yeah. Go ahead. I see a
[13:51]
question for a hand raised.
[13:53]
By Henry. Just wanted to make a
[13:54]
comment to the council that
[13:55]
there
[13:56]
s a lot of information is
[13:56]
going to be presented. But
[13:58]
please, if you have a question
[14:00]
during the presentation, please
[14:02]
feel free to raise your hand
[14:02]
and ask it as we
[14:04]
re going.
[14:08]
I see another one. Okay.
[14:09]
Um, thank you, Curt, and thank
[14:12]
you, Brooke. Um, uh, I
[14:12]
m
[14:14]
wondering if you could talk a
[14:17]
little bit about why sewer and
[14:18]
water have different
[14:19]
depreciation numbers? Because
[14:20]
it seems like that
[14:22]
infrastructure would be similar
[14:26]
to me. Um, and, uh, if we don
[14:26]
t
[14:27]
have that information, it would
[14:29]
be something that I would like
[14:30]
some follow up offline. Thank
[14:32]
you.
[14:34]
Looks like Tracy will weigh on,
[14:36]
weigh in on that first. Perhaps.
[14:44]
Thank you. Sorry. My
[14:44]
connection
[14:46]
s okay. A really
[14:49]
quick answer is that, um, the
[14:51]
sewer utility assets were put
[14:52]
in place over a much longer
[14:54]
period of time. The water
[14:55]
utility assets were put in
[14:57]
place over a much longer period
[15:00]
of time. Sewer only became a
[15:04]
required, um, service. Really?
[15:06]
In sort of the 60s, the 50s and
[15:09]
60s, where the water utility
[15:10]
was built all the way back, you
[15:11]
know, starting at the turn of
[15:13]
the century. And so, so the
[15:15]
sewer assets are actually more
[15:17]
concentrated in terms of when
[15:20]
they reach their age. And the
[15:21]
other thing I just wanted to
[15:24]
say quickly about this minimum
[15:25]
amount of investment is this is
[15:27]
just trying to recognize that
[15:29]
the replacements are going to
[15:31]
ebb and flow over time. They
[15:31]
ll
[15:32]
be bigger in some years,
[15:34]
smaller in others. But this is
[15:36]
a minimum amount to at least
[15:38]
recognize an expected failure
[15:41]
rate with the actual projects
[15:44]
prioritized as part of the
[15:45]
system plan, the actual
[15:47]
replacements. But it really has
[15:49]
to do with the fact that the
[15:51]
sewer assets were added in a
[15:52]
much more concentrated time
[15:56]
period before that. At best, it
[15:58]
was going into septic systems.
[16:00]
Before that, it was just going
[16:03]
where it went. Um, naturally.
[16:08]
Thank you. Tracy.
[16:09]
Go ahead. Brooke.
[16:12]
Perfect. Thank you. Okay, so
[16:12]
we
[16:13]
re going to move on now to
[16:15]
our first set of revenue
[16:16]
requirement results. And
[16:18]
concentrating here on the water
[16:21]
utility in order to build the
[16:23]
financial forecast, we have to
[16:25]
include a few assumptions.
[16:25]
First, we
[16:26]
ll concentrate on the
[16:29]
2026 to 2032 time frame as that
[16:32]
results study period with 2027
[16:34]
to 2028 as the identified rate.
[16:36]
Setting time frame for the
[16:38]
water utility, the combined
[16:41]
reserve target is $7.2 million
[16:43]
in 2027, and that includes both
[16:44]
the operating and working
[16:46]
capital reserves as well as the
[16:49]
capital contingency for rate
[16:50]
revenue projections. We did
[16:52]
work with the city to look
[16:54]
historical, look back
[16:55]
historically at revenue
[16:57]
performance and the associated
[16:59]
heat and precipitation data to
[17:00]
try to ensure that we
[17:00]
re
[17:01]
forecasting revenues on a
[17:04]
normalized usage. Year 2025 was
[17:06]
a more normalized usage year,
[17:08]
and our 26 budgeted revenue is
[17:09]
in alignment with growth
[17:11]
assumptions plus actual
[17:13]
performance forecasting. Future
[17:16]
revenues assumes a 0.9% growth
[17:18]
rate on average, and it also
[17:19]
assumes that the Kirkland Cares
[17:22]
program participation increases
[17:24]
by 10% per year as more
[17:27]
customers join that program. On
[17:28]
the expense side of things, the
[17:29]
city
[17:31]
s 2026 to 2028 budgets
[17:32]
provide the baseline for
[17:35]
expense forecasting, increasing
[17:36]
into the future with
[17:38]
inflationary assumptions. Cost
[17:40]
inflation varies by expense
[17:44]
type between 2.5 to 5.5% for
[17:46]
many of the internal expenses.
[17:48]
Total cost increase by about
[17:50]
5.7 on average, which is really
[17:53]
driven largely by those Cascade
[17:55]
Water Alliance increases that
[17:57]
range from 4.9 to 12.8%,
[17:59]
depending on the year. Um,
[18:01]
Cascade Water Alliance makes up
[18:03]
about 38% of overall water
[18:06]
utility costs in 2026. That
[18:07]
share is projected to increase
[18:10]
to 43% by 2032, as their
[18:11]
increases outpace those
[18:14]
internal city costs, and then
[18:15]
finally, here we are
[18:17]
anticipating that the water
[18:18]
utility will need a new bond to
[18:20]
help fund the capital program
[18:21]
and are forecasting that debt
[18:23]
to be a revenue bond with a 20
[18:25]
year term, a 5% interest rate
[18:28]
and a 1% issuance cost, the
[18:29]
total capital plan for the
[18:32]
water utility is $42 million
[18:36]
over the next six years. So
[18:38]
here, just taking a closer look
[18:40]
at the yeah, sorry.
[18:41]
Before you go on a question on
[18:42]
the previous slide.
[18:44]
Sure. Um.
[18:46]
So when you talk about customer
[18:47]
growth and this is my question
[18:50]
is on all utilities, is the
[18:53]
point 9% per year, is that, uh,
[18:55]
an industry standard? And my
[18:57]
question really is, is that
[19:00]
anticipated growth based on our
[19:03]
comprehensive plan and our cpp,
[19:05]
or is that just a general
[19:06]
growth number?
[19:07]
So it
[19:07]
s certainly it
[19:07]
s not
[19:09]
necessarily industry standard,
[19:09]
and it
[19:10]
s much more tailored to
[19:12]
the city of Kirkland. And staff
[19:14]
did take a look recently on
[19:15]
number of new connections as
[19:17]
well as some near-term history
[19:19]
on that. Um, typically we don
[19:19]
t
[19:21]
always align from a rate
[19:22]
setting perspective with
[19:24]
comprehensive plans, because
[19:26]
those can typically be a little
[19:27]
bit more robust in their growth
[19:29]
assumptions, because engineers
[19:30]
have a different reason for
[19:32]
looking at growth, they want to
[19:33]
be a little bit more robust.
[19:33]
They don
[19:34]
t want to dig up the
[19:36]
street more than once to give
[19:37]
an example there. So when we
[19:37]
re
[19:38]
working through growth on the
[19:40]
rate setting side of things, we
[19:41]
like to look at some near-term
[19:43]
actuals. Sometimes we
[19:43]
ll look
[19:45]
at some connection charge
[19:46]
revenues to give us a good idea
[19:47]
of the number of connections
[19:48]
we
[19:49]
ve been seeing over the last
[19:50]
year or two, and try to base it
[19:51]
more on that.
[19:51]
That
[19:53]
s helpful. That just it
[19:53]
s
[19:53]
it
[19:55]
s a based on Kirkland, not a.
[19:57]
Absolutely. Yeah.
[20:01]
Thank you.
[20:03]
Um, so here just taking a
[20:04]
closer look at the water
[20:06]
utility components. We have
[20:09]
$17.2 million in rate revenue
[20:10]
growing to about 18 million
[20:11]
with that customer growth
[20:14]
element by 2032. Those revenues
[20:16]
are in support of o&m expenses
[20:19]
that range from 15.2 million to
[20:21]
20.8 million. With inflation,
[20:23]
annual system reinvestment
[20:25]
targets increasing from 2.3
[20:28]
million to 3.1 million.
[20:29]
Existing debt service is just
[20:31]
over 100,000 annually for the
[20:32]
utility, and I believe that
[20:34]
will be fully repaid by 2033.
[20:37]
And then we are assuming some
[20:38]
future debt service totaling
[20:41]
about 1.1 million once the
[20:44]
$12.5 million revenue bond is
[20:45]
issued to help fund the city
[20:46]
s
[20:47]
South Reserve replacement
[20:51]
project in 2026 and 27, the
[20:52]
total 42 million in capital
[20:55]
costs is funded by a mix of
[21:00]
direct rate funding at 51%, 30%
[21:02]
from the $12.5 million revenue
[21:04]
bond. Cfc revenues make up
[21:07]
about 19% percent, and we just
[21:07]
have a small amount of
[21:09]
developer contributions. About
[21:11]
200,000 to round out that
[21:16]
capital funding pie. There. So
[21:19]
in this, uh, graph here, we
[21:19]
re
[21:20]
going to pull together all of
[21:22]
the direct obligations of the
[21:24]
water utility in the bars. The
[21:26]
dark blue are the internal o&m
[21:28]
expenses. The light blue bar
[21:30]
represents our Cascade Water
[21:32]
Alliance expenses. Navy blue
[21:34]
are the Cascade Water lines
[21:36]
membership dues. And then we
[21:38]
see the green bar as our direct
[21:40]
rate funded capital with the
[21:41]
yellow bar first appearing in
[21:43]
2027 as the additional debt
[21:46]
service. If we compare those
[21:47]
forecasted costs to our
[21:49]
revenues at existing rates, we
[21:49]
see that we
[21:50]
re just meeting
[21:53]
obligations in 2026, maybe a
[21:54]
slight sufficiency there.
[21:55]
However, as we
[21:56]
re moving into
[21:58]
27 and beyond, we would become
[21:59]
deficient to fund our rate
[22:02]
funded capital in 2027, and we
[22:03]
would not be sufficient to
[22:05]
cover our new debt service by
[22:08]
2029. And eventually our water
[22:09]
purchase costs as we continue
[22:11]
through the study period. So in
[22:12]
order to satisfy that
[22:14]
deficiency, we
[22:15]
re looking at an
[22:18]
8.5% rate increase in 2027,
[22:22]
followed by 6.5% from 2028 to
[22:24]
2030, dropping to about 5.15%
[22:27]
through 2032. Uh, this rate
[22:28]
strategy results in a single
[22:30]
family bill impact of
[22:33]
approximately $4.81 in 2027,
[22:37]
and just under $4 in 2028. Uh,
[22:39]
this somewhat front loaded rate
[22:41]
strategy would allow the water
[22:42]
utility to satisfy the
[22:44]
operating and capital
[22:45]
contingency targets. In all
[22:51]
years of this study period.
[22:52]
Which is shown in this craft
[22:54]
here. So with the proposed
[22:56]
strategy in place, we would
[22:57]
meet our target beginning in
[23:00]
2027. On the operating side and
[23:01]
stay at that target through
[23:04]
2032 on the Capital Reserve
[23:06]
side. Our use of debt and the
[23:08]
continued commitment to fund
[23:10]
our system reinvestment target
[23:13]
allows the reserves to build in
[23:14]
preparation for some of those
[23:16]
unknown capital infrastructure
[23:17]
needs that are going to be
[23:18]
coming from the soon to be
[23:20]
completed water system plan.
[23:22]
Uh, the orange line on these
[23:23]
graphs graphs is shown to
[23:24]
illustrate the effects of the
[23:26]
fund balance. If we were to
[23:27]
hold our rates at their
[23:29]
existing levels. So as we saw
[23:30]
in the revenue requirement
[23:32]
graph, that would result in
[23:34]
forecasted deficiencies that
[23:35]
would ultimately deplete
[23:37]
reserves on both the operating
[23:39]
and eventually the capital side.
[23:42]
Let
[23:44]
s pause for a second and
[23:45]
see if anybody has any
[23:51]
questions.
[23:54]
If not, a quick water drink.
[23:56]
Exactly. Okay, there we go.
[24:00]
Councilmember Prem. Yeah, I
[24:02]
wanted to actually, um,
[24:03]
apologize. I should have asked
[24:05]
this question earlier, but the
[24:06]
I think it was two slides ago
[24:09]
where you talk about the, um,
[24:10]
the maintenance and the. Yeah,
[24:14]
this one here, the o&m is, um,
[24:16]
can you just maybe because it
[24:16]
looks like that
[24:18]
s one of the,
[24:20]
you know, it is the largest
[24:22]
expense that we have. So, uh,
[24:24]
can you just walk us through
[24:26]
very briefly, like, what is
[24:29]
like, is that an increase? Uh,
[24:31]
in these types of expenses as
[24:32]
compared to prior years and
[24:34]
kind of what is the primary
[24:36]
driver? You.
[24:37]
So when. Yeah, when we look at
[24:39]
this particular o&m expense
[24:41]
line going from 15.2 to 20.8
[24:43]
million, this is both a
[24:44]
combination of the city
[24:44]
s
[24:45]
internal budget. So that
[24:46]
s
[24:47]
their, you know, personnel,
[24:49]
their benefits, their all of
[24:50]
the services that they provide
[24:52]
internally. It also includes
[24:54]
the Cascade Water Alliance
[24:56]
components. So on the internal
[24:56]
side, I
[24:57]
m going to flip back
[24:58]
here for just a second so we
[24:59]
can talk about the expense
[25:02]
inflation internally salaries,
[25:04]
benefits, all of those expenses
[25:06]
that the city is in charge of
[25:08]
or can control are increasing
[25:11]
by between the 2.5 to 5.5%. And
[25:11]
we
[25:12]
ll typically see the higher
[25:14]
increases related to things
[25:15]
like benefit costs, because
[25:15]
that
[25:16]
s what we
[25:17]
ve seen in the
[25:19]
industry. Uh, just in in real,
[25:21]
real terms, real increases
[25:23]
there. Um, what we see as a
[25:24]
bigger driver, though, really,
[25:26]
is those the Cascade Water
[25:28]
Alliance increases and they
[25:31]
become a larger proportional
[25:33]
share over this time frame and
[25:35]
are driving up those o&m costs
[25:39]
closer to that 6% over time.
[25:40]
Um, so it is a combination of
[25:45]
internal and external. Yeah.
[25:50]
Anyone else? Okay. Go ahead.
[25:52]
All right.
[25:53]
Um, so this as we move into our
[25:55]
discussion here for the sewer
[25:55]
utility, we
[25:56]
re going to see a
[25:57]
similar layout to these slides
[25:59]
and materials, um, with similar
[26:00]
topics that we
[26:00]
ll talk about
[26:04]
for each. Uh, so similar time
[26:05]
frame for each utility. We
[26:05]
re
[26:07]
going to concentrate on 2026 to
[26:10]
2032 study period. With the 27
[26:12]
to 28 concentration for rate
[26:14]
setting, um, for this sewer
[26:16]
utility, the combined operating
[26:18]
capital reserve targets total
[26:20]
just under $8 million in 2027.
[26:22]
And similarly for revenue
[26:25]
forecasting purposes. Oh, do we
[26:27]
have a hand or is that an.
[26:29]
I think that was a residual
[26:33]
hand. Sorry, Councilmember.
[26:36]
Okay, perfect. Thank you. Uh,
[26:38]
for for revenue forecasting
[26:40]
purposes again here we did base
[26:43]
the 2026 forecast off of 25
[26:45]
actuals plus growth. And again,
[26:46]
25 being a more normalized
[26:48]
historical year there. And here
[26:48]
we
[26:50]
re assuming average system
[26:53]
growth of about 0.7% annually.
[26:55]
Um, just like water, we assumed
[26:56]
that the Kirkland Cares
[26:57]
participation would also
[26:59]
increase by 10% per year as
[27:00]
more customers took advantage
[27:03]
of that program on the expense
[27:04]
side of things, again, we
[27:05]
re
[27:05]
utilizing the city
[27:07]
s 2026 to
[27:08]
2028 budget as the baseline and
[27:10]
added adding inflation to those
[27:12]
future years. Those internal
[27:15]
costs will inflate by between
[27:17]
two and a half to 5.5%, really,
[27:18]
depending on, again, that
[27:21]
expense type. Overall, o&m is
[27:24]
increasing by 10.7% annually.
[27:25]
And again, this is really
[27:27]
driven by external factors
[27:28]
related to King County
[27:30]
treatment rate increases that
[27:33]
range from 11.25 to 12.75%
[27:36]
annually. Um, like we saw on
[27:38]
water, King County is becoming
[27:39]
a larger share of utility
[27:41]
expenses over time, starting at
[27:44]
44% of total costs in 2026,
[27:47]
projected to increase to 56% of
[27:48]
total sewer utility costs by
[27:52]
2032. Uh, no new debt is
[27:53]
forecast to fund the total
[27:55]
capital program of about $31.1
[27:57]
million in escalated project
[27:59]
costs on the sewer utility side.
[28:03]
So again, here, we
[28:04]
re going to
[28:05]
take a closer look at the key
[28:07]
components for sewer. We show
[28:08]
existing revenue of 20.9
[28:10]
million, growing to 30.8
[28:12]
million by 2032. Again just
[28:14]
with that growth assumption.
[28:16]
Those revenues are in support
[28:18]
of o&m expenses of 18.1 million
[28:21]
and 26, increasing to 33.3
[28:23]
million. And again, this is one
[28:23]
of those areas that
[28:24]
s largely
[28:26]
driven by those external King
[28:29]
County treatment expenses, um,
[28:31]
system reinvestment for sewer.
[28:33]
It starts at 3.9 million in
[28:34]
2026, increasing to 4.8 by
[28:37]
2032, and pretty similar with
[28:39]
water. Existing debt service is
[28:41]
just over $100,000 annually.
[28:43]
And for the sewer utility, we
[28:43]
don
[28:45]
t have any new future debt
[28:46]
service to fund the capital
[28:48]
plan, and that total of about
[28:50]
31.1 million in capital
[28:51]
projects is planned to be
[28:53]
funded through direct rate
[28:55]
funded capital of about 82% and
[28:58]
about 18% from CFCs. We have
[28:59]
just about $100,000 planned
[29:01]
from developer contributions
[29:02]
there, so the bulk is really
[29:08]
great and cfc funded. Okay, so
[29:10]
bringing together the the
[29:11]
direct obligations for the
[29:13]
sewer utility here, the bars
[29:14]
are representing those
[29:15]
obligations, with the dark blue
[29:18]
bar being our internal city o&m
[29:20]
expenses. The light blue, our
[29:21]
King County wastewater
[29:23]
treatment charges followed by
[29:24]
state funded capital in the
[29:27]
green bar. So what we see here
[29:29]
when we compare our forecasted
[29:30]
obligations to our revenues at
[29:32]
existing rates, is that we
[29:32]
re
[29:34]
forecasting a deficiency in
[29:37]
2026, in order to fund our full
[29:38]
rate funded system reinvestment
[29:42]
target of 165% of depreciation,
[29:43]
we will need to utilize
[29:46]
operating reserves, moving
[29:48]
forward without any rate
[29:49]
action, which is noted by that
[29:51]
solid black bar in the graph.
[29:52]
We
[29:53]
d be deficient to fund our
[29:55]
rate funded system reinvestment
[29:57]
fully by 2028, and we wouldn
[29:57]
t
[29:58]
be able to fund our King County
[30:00]
treatment charges by the 2029
[30:02]
or 2030 time frame, at least in
[30:05]
full. Uh, so in order to
[30:08]
correct the deficiency in 2027,
[30:09]
while maintaining our rate
[30:11]
funded system reinvestment at
[30:14]
the 165% of depreciation, as
[30:15]
well as maintaining the
[30:17]
operating reserve at a minimum
[30:19]
of 2 million, the sewer utility
[30:22]
is looking at a 19.5% increase
[30:25]
in 2027, followed by about
[30:28]
8.95% annually thereafter. The
[30:30]
typical single family customer
[30:33]
would see an increase of $16.25
[30:34]
a month from this change in
[30:37]
2027, followed by a monthly
[30:39]
increase of about $13.37 in
[30:42]
2028. It should be noted here
[30:43]
that a single family sewer
[30:44]
customer will see the King
[30:45]
County portion of their bill
[30:48]
directly passed through, which
[30:49]
is a large rate driver,
[30:55]
especially in 2028 and beyond.
[30:56]
Right. Let
[30:58]
s hang on. I
[30:58]
ll let
[30:59]
you have one more.
[31:00]
Go ahead. I was going to wrap
[31:01]
it up real quick and then I
[31:01]
ll
[31:03]
pause. But here just taking a
[31:04]
look at the operating and the
[31:06]
capital reserves for the sewer
[31:09]
utility. We are starting 2026
[31:10]
below target on the operating
[31:12]
fund. The rate strategy that
[31:12]
we
[31:13]
re proposing does not
[31:15]
immediately correct the fund
[31:17]
balance deficiency and instead
[31:19]
slowly grows the reserve back
[31:21]
to target through 2032. The
[31:23]
upfront rate increase proposed
[31:25]
would keep the reserve above $2
[31:27]
million in 2027, and correct
[31:29]
the initial cash flow
[31:31]
deficiency, while still funding
[31:32]
rate funded. System
[31:33]
reinvestment at those target
[31:35]
levels. On the capital side, we
[31:38]
see balances ending 2026 at
[31:40]
just above $10 million. That
[31:41]
reserve would grow with
[31:43]
continued rate funding ending
[31:46]
2032. About 15.5 million.
[31:46]
That
[31:47]
s similar to water again
[31:49]
with upcoming system plan
[31:50]
needs, it can be prudent to to
[31:52]
maintain those reserve balances
[31:53]
in preparation for some of
[31:57]
those unknown costs. Happy to
[31:59]
pause.
[32:06]
Thank you. Brooke. Council. Any
[32:15]
questions? Okay. We
[32:15]
ll go
[32:16]
ahead.
[32:18]
All right. All right. So next
[32:18]
we
[32:19]
re going to review
[32:20]
preliminary surface water
[32:22]
outcomes. And again very
[32:24]
similar layout. We
[32:24]
re going to
[32:27]
show you results through 2032
[32:28]
with the rate setting period
[32:31]
concentrating on 27 and 2028.
[32:33]
The 100 day o&m target plus the
[32:36]
10% of the cip, results in a $6
[32:37]
million combined reserve target
[32:40]
in 2027 for surface water. And
[32:42]
here we typically again see
[32:44]
more steady revenues. But we
[32:45]
reviewed the forecast with that
[32:47]
same thought process for
[32:48]
forecasting our revenues. So
[32:50]
determining whether our 2026
[32:51]
budget was in alignment with a
[32:53]
forecast of 25 actuals plus
[32:56]
growth and an associated rate
[32:59]
increase, stormwater utility
[33:00]
growth average is about a half
[33:03]
a percent annually, and it also
[33:04]
represents a senior discount
[33:06]
participant participation rate,
[33:08]
growing at about 10% annually,
[33:10]
which is administered by the
[33:13]
county for expense forecasting,
[33:14]
will rely again on the city
[33:14]
s
[33:16]
2026 to 2028 budgets, plus
[33:18]
inflation. Inflation varies
[33:20]
here for for sface water
[33:23]
between the 2.5 to 5.5%,
[33:24]
depending on the type of
[33:26]
expense and then overall
[33:27]
operating expenses are
[33:29]
increasing just under 3% in the
[33:31]
forecast because there really
[33:32]
are no external cost drivers
[33:34]
for the surface water utility
[33:37]
to be perhaps pushing that up.
[33:39]
We are also not forecasting any
[33:40]
new debtor the surface water
[33:42]
ility at this point to help
[33:45]
fund that $31.7 million capital
[33:50]
plan through 2032. So looking
[33:52]
at the key components here for
[33:53]
surface water, we hav about
[33:55]
$14 million in existing rate
[33:56]
revenues growing to $14.2
[33:59]
million with customer growth.
[34:00]
That is in suppo of o&m
[34:02]
expees that range from 12.8
[34:05]
miion to 15.2 million. System
[34:07]
Reinvestment Funding of 3.1
[34:09]
million, increasing to 3.6
[34:10]
million. And then the
[34:12]
stormwater utility currently
[34:13]
has no existingebt and no
[34:15]
future forecaste debt to fund
[34:18]
the capital program a direct
[34:19]
rate funded capital is
[34:22]
anticipated to fund 77% of the
[34:24]
capital program, with 16%
[34:26]
coming from external fundi.
[34:28]
That external fundings made
[34:29]
up of a Department o Ecology
[34:31]
forgivable loan, as well as
[34:33]
some developer developer
[34:34]
contributions. And then
[34:35]
finally, we
[34:36]
ve got cfc revenue
[34:36]
at
[34:37]
s going to me up the
[34:39]
maining 7% of our o funding
[34:42]
needs for stormwater.M, so
[34:43]
re again, in our revenue
[34:45]
requirement forecast, we see
[34:47]
thos blue bars reprenting
[34:48]
our own expenses. And then the
[34:50]
green bar here showi direct
[34:52]
rate funded capital, comparing
[34:54]
the obligations to existing
[34:56]
revenues in 2026, we see the
[34:58]
surface water utility is also
[35:00]
foreca to be defient to
[35:01]
fullyover t 100%
[35:03]
deeciation target for rat
[35:06]
funded capital in order to fund
[35:07]
the fl targeted amount, the
[35:08]
utility would need to rel a
[35:11]
bitn reserves. Um, moving
[35:13]
foard, I Doe re action is
[35:14]
taken,he utilityould fall
[35:16]
short to providing any rate
[35:18]
funded capital by 2029nd
[35:19]
wouldventually not be ae to
[35:20]
cover their tot o&m expenses
[35:23]
the future. So in oer to
[35:24]
satisfy that deficncy, we
[35:24]
re
[35:27]
oking at 7.15% increases from
[35:30]
2027 through 202 before
[35:34]
dropping to 2.75% thereafter.
[35:35]
This stratys set wit the
[35:37]
e intento resolvehe cash
[35:40]
flow defiencyy 2029 and
[35:42]
ilize available fund balance
[35:45]
to do so. Uh, a.15% increas
[35:47]
results in anncrease o
[35:51]
between $65 and $1.77 a month
[35:54]
in 2027 and 2028. For a typical
[35:55]
sile family customer. And
[35:57]
agn, these rates are on
[35:59]
property taxes so he a
[36:00]
litt bit less visibility tn
[36:02]
some of our wer, sew or
[36:06]
solid waste rates. Finally
[36:07]
here, um, looking at fund
[36:09]
bances for the stormwater
[36:11]
utility we doee on the
[36:12]
operating side tha we have
[36:15]
ailable fundalance in 2026
[36:17]
that allows us tohasen the
[36:19]
rate increas and whether the
[36:21]
sh flow defiency or
[36:23]
three year period. So he fd
[36:25]
lances meet or slightly
[36:26]
exceed the orating targen
[36:28]
al years of the forecast
[36:29]
period Withhis rate straty
[36:32]
in place, the capital fun wl
[36:34]
se growth in resves as the
[36:35]
city conties to fund the full
[36:37]
rate fund assisd reinvesent
[36:39]
taet, growing until 2031,
[36:40]
when the city has a lger
[36:41]
capital expditure and the
[36:43]
reserves wl fall, but will
[36:48]
never fall below the target.
[36:48]
I
[36:50]
ll pause here for just a
[36:52]
second before I han ito
[37:00]
Aman.
[37:02]
Al right, see no questions.
[37:05]
, yh. Gohead.
[37:07]
Okay, perfect. I wil pass it
[37:09]
to Amanda t walk through the
[37:11]
sod waste discussion. Um, a
[37:11]
you
[37:12]
ll notice a l of
[37:13]
nsistency with these slide
[37:16]
asell. So go ahead, Amaa.
[37:16]
Grt. Thankou.
[37:17]
Brooke,an.
[37:19]
You all hear me oy okay.
[37:21]
Peect. Uh, and as we wen
[37:22]
throughhe slides befe, just
[37:24]
el free to chime in if there
[37:25]
are any questio thatome up
[37:28]
on the solid waste utility So
[37:28]
right now we
[37:29]
re looking at the
[37:31]
a similar screen that we s
[37:32]
forhe other utities with
[37:35]
our study data. Assumptio
[37:37]
he. Our period for the study
[37:40]
is going to be abo 2026 to
[37:42]
2032 timeframe. And we
[37:44]
looking at mting the spefic
[37:46]
lid waste reserve tget of
[37:49]
3,000,000 in 2027. Equates to
[37:51]
out 30 day of orating
[37:54]
expees for the utity. With
[37:56]
that custome growth. So w
[37:56]
re
[37:58]
lookg at an average o 0.6 I
[38:00]
stomer gwth fm that time
[38:01]
frame. Moving on. That
[38:01]
s an
[38:03]
average.H, looking at
[38:05]
differentinds o customer
[38:06]
classes like residenal,
[38:09]
commercial, multimily. And
[38:09]
then we
[38:10]
re looking a an annual
[38:12]
rate revenue of aut 32.3
[38:16]
million in 2026, wch we wil
[38:18]
needate increes to keep
[38:20]
pace with the expense inftion
[38:20]
that
[38:21]
s happening. Asou can
[38:23]
see in the dark gen box. So
[38:25]
Brooke mtionedarlier, we
[38:27]
ha internal costs tt are
[38:30]
increasing from about 2.5 to
[38:32]
5.5% eachear. But there are
[38:35]
so contractual costs like t
[38:37]
waste manement contractnd
[38:38]
other King County disposal
[38:41]
items tha are increasing a a
[38:43]
higherate tha somef those
[38:45]
internal factors And just to
[38:48]
touch ohe makeupf those
[38:52]
o& eenses, aut5% of the
[38:53]
budget for the solid waste
[38:55]
utilityre tho contractual
[38:57]
costs. So tt becomes a reay
[38:59]
bigortion ofhe expenses
[39:02]
that need to be covered becse
[39:04]
of those large contractual
[39:05]
costs. There are no city
[39:08]
specic cip itemsnd there
[39:09]
s
[39:10]
no new debtor the utility
[39:13]
either. S on the next slide,
[39:14]
we c lookt a slightly
[39:17]
condense version, um, o that
[39:19]
revenueequirement. Summary.
[39:21]
Ashere are no capital costs,
[39:22]
the system reinvestment and
[39:25]
de are a huge portion or a
[39:26]
part of a all of t solid
[39:29]
waste utili. S you can s
[39:32]
inhe first box there in 2026,
[39:33]
we have our cash operating
[39:36]
expens inhe blue. Our waste
[39:47]
management charges in that teal
[39:47]
blue. And the King County
[39:47]
charges in the more greish
[39:47]
teal color. So really the
[39:47]
jority ofhose cos are
[39:47]
based on contract kin of
[39:51]
outside sources.N 2027, the
[39:54]
utility requires a.75 rate
[39:56]
increase to be able to meet
[39:59]
thatpecific tget outlined
[40:01]
the previous slide. So right
[40:03]
now there is a sght
[40:04]
deficiency I wt is being
[40:06]
pt in t solid waste
[40:08]
utilities fund balance.Nd so
[40:08]
that
[40:11]
s 6.5 right. Stop fund
[40:13]
balance within the first year
[40:16]
past 202 The utility can keep
[40:20]
a 3.95% rate increase in order
[40:22]
to meet those contractual needs
[40:24]
over the forecast perd, but
[40:27]
also anticatinghat on a
[40:29]
longer scale we
[40:29]
re goi to
[40:31]
y to meet that0 day fun
[40:35]
bance until 2042. I believe.
[40:38]
, or 204 actually. So if w
[40:41]
go tohat next slide.
[40:43]
Ju real quick.
[40:45]
Oh yeah.
[40:56]
Councilmber Pre Go ahead.
[41:03]
There you g. Councmember. Go
[41:05]
ahead. The the I
[41:06]
m just looking
[41:09]
at theame. Can youear me?
[41:10]
You
[41:10]
reou
[41:18]
rereaking up. I
[41:19]
thin she
[41:20]
frozen. Can you
[41:31]
hear me? Yes. Go ahead. Um, so
[41:32]
I was just lking back at the
[41:34]
o&m expensgain,nd I just
[41:37]
nted to underand, um, like
[41:49]
the Kg. Couy. Um. And
[41:49]
that
[41:54]
shrough 20, 30. Four.
[41:55]
Like, ist like. I guess
[41:55]
th
[41:56]
s one questio Like, how
[42:04]
is tt brokenut? And then.
[42:10]
Rate increases already. Jus.
[42:12]
Councilmember. Your you
[42:12]
re
[42:13]
eaking up and we
[42:14]
re having
[42:14]
trouble. Why don
[42:15]
t you try to
[42:16]
turn off yr video and see if
[42:33]
that hps Try it again. We
[42:34]
re
[42:41]
having tuble now. Okay.O,
[42:43]
um. No. No worries. I
[42:45]
ll askt
[42:48]
at aater time. Tnkou.
[42:52]
Anyone elseave questions
[42:54]
Okay. G ahead. Amanda.
[42:57]
Okay. Thank you. And I will,
[42:59]
um, maybe tryo anticipate
[43:01]
what that was kind of askin
[43:03]
abt the King Cnty dispol.
[43:05]
Uh, that portion, even tugh
[43:06]
our fecasts going o till
[43:08]
2032,e areontinuing those
[43:10]
costs. Um, throuout t the
[43:12]
full forecast as wl. So those
[43:12]
en
[43:14]
t just till 2032. So on
[43:17]
this slide, u below the graph
[43:19]
we have an example bill for the
[43:22]
35 galnin. Uh andhis is
[43:24]
going to change bybout $ and
[43:27]
2027 wit that.75 rate
[43:29]
increase. Uh, and then about an
[43:32]
avage of, of $2.30. Uh,
[43:34]
beyond tha loong at 2nd
[43:38]
29.O if we g to the next
[43:39]
slide a take look at the
[43:42]
fu balance asssment. So
[43:44]
rit now I 2026, we see that
[43:47]
blue bar wch iselow the0
[43:51]
days of o&m expens. Um, I
[43:53]
27 we see tha blue bar
[43:55]
acally hit the black dotted
[43:57]
ne, which mns tt the 6.7%
[43:59]
is gting us to meet that
[44:01]
target reserve. We do exceed
[44:03]
thos 30 days. Once w get to
[44:05]
the mid partf our forect,
[44:07]
but w are also anticipatin
[44:09]
plned, um, contractual
[44:12]
renegotiatio in 2032 and want
[44:13]
keep that in mind and keep
[44:15]
our rate increes. Having us
[44:17]
least meet our operang
[44:19]
target through the e of the
[44:21]
full forecast. S t solid
[44:22]
wastetility takes a ltle
[44:25]
bi more of a long term look.
[44:26]
Uh, becse of the naturf
[44:28]
thos contracts, then maybe
[44:30]
wate ser o storm doeshen
[44:30]
we
[44:31]
re thinking abo those rate
[44:35]
increases. Um, f the0 ds
[44:36]
as well, this is something
[44:39]
that,ou know, a Brooke
[44:40]
explaid in tse previous
[44:41]
ides, we are tryg to g to
[44:43]
in that fst year. So that
[44:45]
really is what the 6.75 is
[44:46]
going towds that 30ays of
[44:51]
operating Right And I will
[44:53]
wrap up the solid waste
[44:54]
discussion there. If tre are
[44:56]
anyther questions on thi
[44:57]
utilit
[45:02]
Council, any qstionsll
[45:04]
rit. Go ahead.
[45:06]
All right. So jt I
[45:08]
concsion here. Thanks,
[45:09]
Amanda for that piece.M,
[45:09]
we
[45:11]
going to bring backhe
[45:13]
combined bill smaryere
[45:15]
ross the fr pliminary
[45:17]
strategies that you saw tay
[45:19]
in inclusive of taxes and other
[45:21]
es. Um, aypical single
[45:23]
family customer would see an
[45:26]
impact o approximately $29.10
[45:27]
a mth across all fr
[45:30]
utities in 2027.Hatmpact
[45:32]
would decase t about $23.6
[45:35]
a monthn 2028. Um, projected
[45:37]
rate impts or forasted
[45:39]
thugh 2032.Ut just as a
[45:39]
reminder, we
[45:40]
re really
[45:41]
concentrating on the rate
[45:43]
setting period of 2027 and
[45:47]
2028.T this point,m, and
[45:49]
then finally, wel wehowed
[45:51]
u all a set of preliminary
[45:52]
rate and capal fding
[45:53]
strategies for each of the
[45:55]
utilities. Tonight. We are
[45:57]
working with wh city staff on
[45:59]
additional rate scenarios that
[46:00]
coul include the following
[46:02]
adjuments or lers, if you
[46:03]
wi. Um, so first of all, we
[46:05]
will bng back scenarioshat
[46:06]
incle service package
[46:08]
expens tohow their impacts
[46:11]
on t rate sategies inrder
[46:13]
to mitige some upfront rate
[46:15]
increas. We couldook at
[46:18]
meeting reserve targets by 203
[46:21]
instead of immedialy in 2027.
[46:22]
For wer,urface water, and
[46:25]
lid waste,nd primarily for
[46:27]
wer, we could look to reduc
[46:29]
our system reinvestmt funding
[46:31]
ntributions f aeriod of
[46:33]
time to helpitigate those
[46:34]
rate increaseshat are rated
[46:37]
to that fund bance recery.
[46:39]
The secon two levers, with
[46:41]
guidance fro council, could
[46:42]
help to eas those near-term
[46:48]
rate pressures. Yes, I see a
[46:49]
queson.
[46:52]
Uh, Couil Membe Arnold.
[46:54]
ank you. I look forward to
[46:56]
seeing some of the options.
[46:56]
When you
[46:58]
re lking at reserve
[47:00]
targets, can we get multiple
[47:03]
option for replenishment Um,
[47:04]
forome, I
[47:04]
I
[47:05]
m curious
[47:07]
abthat are t impacts. If
[47:11]
we close over, um, a bieium
[47:12]
or two insad ofll the way
[47:15]
out to 2032 and MAY want to
[47:17]
look at options that treat
[47:19]
different utities differely.
[47:33]
Absotely
[47:36]
COUNCILMAN Pascal.
[47:41]
Thank you. Um, question or in
[47:44]
couple o comments. Um, one is,
[47:45]
uh, it
[47:46]
really I reall like
[47:47]
the table at the begning of
[47:48]
the memo.Hat kind o shows
[47:51]
all the the rate increases ove
[47:52]
the nex six years for each of
[47:55]
the indidual utilities. Um,
[47:58]
byercentage. Uh, cou you
[48:00]
wh when you comeack, could
[48:01]
you just have an overall
[48:03]
perctage incree by year
[48:05]
when y, when y look at all
[48:07]
of them togetr? Sure. Um,
[48:11]
that would be hpful. Um, and
[48:12]
then, you know,y second
[48:14]
comment is Ion
[48:15]
t I
[48:16]
love t
[48:17]
hear seone disagree with
[48:19]
this, but it feels le these
[48:21]
these rate increases are going
[48:23]
be really impactful. Um,
[48:26]
really, uh, impacting cost of
[48:28]
living, affordabity, you name
[48:33]
it.M, and I know that I kno
[48:33]
that eveone
[48:34]
s ccerned about
[48:38]
that. Uh, generally, um, b we
[48:39]
te to kind of
[48:40]
compartmentaze things a
[48:41]
say,h, well,t
[48:42]
s because of
[48:43]
is little thing here, and
[48:44]
en this thing over here, and
[48:46]
then this rightver here, and
[48:50]
this agency over here, and and
[48:52]
then it it com across as like
[48:53]
kind of shrug our shoders
[48:54]
and go,h, there
[48:55]
s nothing we
[48:57]
can do. A then we just move
[49:01]
forward and, um, I guess I wt
[49:02]
challenge tha kind of
[49:05]
thinking And, u and know
[49:05]
that we
[49:07]
ve hadonversations,
[49:09]
reonal rate conversation. Um,
[49:11]
I know that we talked about
[49:12]
this individually forhe
[49:15]
differen utilities. Iust
[49:17]
wod,
[49:18]
m asking for pbably
[49:18]
something that
[49:19]
s impossible,
[49:21]
but just like more, more
[49:23]
emphisn, like, wt c we
[49:25]
do? Like what I in our purview
[49:26]
that actuallyan have
[49:29]
meaningful change? Um, you
[49:29]
know, what
[49:31]
s the what
[49:33]
s the the
[49:37]
leas bad optio Um, so that
[49:37]
s
[49:38]
just something that
[49:38]
s on my
[49:39]
mi. It
[49:39]
s a it
[49:40]
s it
[49:40]
s a
[49:41]
frtration o mine. I
[49:41]
m sure
[49:42]
it
[49:43]
s frustrati of oers as
[49:44]
well. It
[49:45]
like I feel
[49:48]
powerless. Thankou.
[49:51]
Thank you.Ity manager.
[49:53]
Yeah. So think we all share
[49:55]
that concern tt the rates
[49:56]
are going up in the totality of
[49:57]
them. It
[49:58]
not sustaable f
[49:59]
the community. You know,ne of
[50:01]
th reasons behineally
[50:02]
pushing for t regional rate
[50:05]
summits was, you know, take
[50:05]
thisnd y
[50:06]
all sawt on top of
[50:07]
it,uget Snd Energy, right.
[50:10]
An, um, it
[50:10]
s jus not
[50:11]
someing that can be
[50:12]
suained. So inhe first
[50:13]
summit, what we learned was
[50:15]
that big chu of t
[50:16]
increase aoss a utilities
[50:18]
was regulatory. And so to your
[50:19]
point about challenging
[50:21]
asmptions, it
[50:21]
sard for us,
[50:22]
just particularly in the
[50:23]
Pacific Northwest to think
[50:26]
about. Would y defer some
[50:27]
environmenl regulatns?
[50:29]
Wouldou defer se climate
[50:30]
mmitmentsn ordero save
[50:33]
rate impacts? Right. So those
[50:33]
ar the kinds of thing that
[50:34]
needo happen athe regional
[50:35]
level. And we
[50:35]
ve been reall
[50:37]
pushinh, this new count
[50:39]
execute to take up that, uh,
[50:40]
ose affordability
[50:42]
assignments, uh, becausecross
[50:43]
all of the Kg County is a
[50:45]
major player here. So isuget
[50:46]
und Energy. So that
[50:47]
s oneay
[50:47]
I think w
[50:47]
re going to kee
[50:48]
trng.Nd then we
[50:49]
re looking
[50:50]
very hd at everythg we c
[50:52]
do on t flip side, I haveo
[50:54]
keep our own cts dn. Well,
[50:55]
so we defitely don
[50:55]
t want to
[50:56]
shrug. And we definitely are
[50:58]
dog what we can to try to
[50:59]
find path forrd here. Tnk
[51:03]
you forhat comment.
[51:06]
Deputy mayor.
[51:09]
Uh, tnk you, MAY.Nd, uh,
[51:10]
and thank you,ity Maner,
[51:12]
uh, for remindi us about
[51:13]
rkland
[51:14]
s effor onhe, um,
[51:18]
regional utility smit. Um,
[51:18]
I
[51:20]
m looking forrd to the
[51:22]
seco summit andhether we
[51:26]
ca start makin more progress
[51:28]
toward se concrete proposals
[51:31]
from the lger group. Um, I
[51:32]
share the conce tha
[51:34]
Councilmemr Pascal raise I
[51:36]
thin we allo. Um, acu
[51:40]
concern, uh, whichs why, you
[51:43]
kn, to put it, I think, to
[51:45]
kind of add a plu one to wt,
[51:46]
Counciember Pascal?
[51:47]
Everything, everything tt is
[51:49]
in our control. One thi I
[51:51]
appriated was already I t
[51:54]
oposals and the discuion
[51:55]
ar some suggestions f howo
[51:58]
smoo the the rat increas
[52:00]
Um I jus want tomphasize
[52:02]
atever is within our contr
[52:03]
settin the regional rate
[52:05]
summit, uh, aside and som of
[52:06]
th strategies that MAY ce
[52:08]
out o that, um, whatever isn
[52:11]
our ctrol. U I want us to
[52:12]
bring all that to bear. And I
[52:13]
preciate the staff
[52:14]
s
[52:16]
iniative already in
[52:17]
identiing se of those
[52:19]
things, but, um,gain, if it
[52:20]
in our ctrol,
[52:21]
d like to see
[52:23]
it as part of our prosal, at
[52:25]
ast, uh, to uerstand, uh,
[52:27]
what I would mea and what its
[52:29]
impact would be. So I jt want
[52:29]
to add my voi to that.
[52:31]
Thanks.
[52:32]
Thank you, Cncilmember Primm.
[52:33]
Welcome bk. Okay. Let
[52:34]
s see
[52:35]
if this wor. Hope you c
[52:36]
hear m Sound good? Okay.
[52:39]
Peect. Um, so I, I complely
[52:42]
echo what, um, othersave said
[52:43]
garding just how iactful
[52:45]
ese rate increases
[52:48]
potentiay can be. Um, if if
[52:49]
they continue to be those rat
[52:53]
in t future. Um, and I think
[52:53]
I, I
[52:55]
just lik to understand
[52:57]
kind o what is our primary
[53:01]
mechanism t now. Nowhat we
[53:03]
know, um,hat I going to be
[53:05]
kind of the input into these
[53:08]
potentially increases in rates
[53:10]
at is whatre our nextteps
[53:13]
to, um, I don
[53:14]
t know, assign
[53:16]
individuals, uh, within the
[53:19]
city toay, all right, youo
[53:20]
and you know,ou
[53:20]
re goi to
[53:22]
and workn kind of these
[53:24]
regial efforts, and then you
[53:26]
are going to go workn,m,
[53:28]
pontially looking intour
[53:31]
ternal mechanism and how to
[53:32]
reduce tse rates, I guess,
[53:35]
what is our orall strategy on
[53:37]
steps forward to kd of get
[53:43]
this done? City manager
[53:44]
Thank you. Thank you f my
[53:46]
nd raised. But so it
[53:47]
s got to
[53:48]
play o across a viety o
[53:50]
different, uh, discussions wh
[53:52]
the counc at dferent cy
[53:54]
strategies. So in the council
[53:55]
s
[53:55]
budget process, you
[53:56]
re going to
[53:57]
ar a lot morebout the
[53:59]
capitalrojectsnd the rates
[54:01]
and the overall cityudget.
[54:02]
Um, and we
[54:02]
ll talk about se
[54:03]
of thosehings. So some ofhe
[54:04]
things we
[54:04]
re looking at, for
[54:05]
exple, the council did give
[54:07]
us permissio toring on some
[54:09]
additional staffing to wor
[54:10]
partularly withhe Cascade
[54:12]
Water Allnce and the regional
[54:15]
um, wasteter disssions that
[54:17]
are going on.Nd, uh, right
[54:18]
now we
[54:18]
ve been committin
[54:19]
acss all levs. So I
[54:19]
ve been
[54:20]
very iolved inhese
[54:22]
diussions.He mayor has been
[54:22]
very involve These
[54:25]
discussions. Uh, Couilmember
[54:27]
Arnoldnd Deputy Mayor, uh,
[54:28]
black haveeen involved. And
[54:30]
obviously, uh, Cncilmember
[54:31]
Pascal is our representative on
[54:32]
the Cascade Water le. So I
[54:33]
ink we
[54:33]
ve beenrying to
[54:36]
dress at every level to h
[54:37]
City of Kkland can bring
[54:38]
different anasis and
[54:39]
diffent thinking to sort of
[54:39]
challenge peoe
[54:40]
s assumions
[54:42]
and try to lower some of t
[54:44]
costs. Um, so we
[54:45]
re gng to be
[54:46]
rking at the state level too.
[54:46]
We
[54:46]
ve, we
[54:47]
ve had I our work
[54:49]
program last time that anying
[54:50]
that comes outf these summi
[54:51]
or ideas isomething that
[54:51]
they
[54:52]
d wt to be taking to the
[54:54]
state level, y know, and so,
[54:55]
uh, right now it
[54:57]
s still a big
[54:58]
pu uphill because these are
[55:00]
decadesn the makg. A lot of
[55:02]
these decisio at the regiol
[55:03]
lels. And it
[55:05]
sard to get
[55:06]
anyo to challenge their
[55:07]
thinking in the short ter as
[55:09]
this kindf sprung upon us.
[55:11]
T as one as, uh, Jenny
[55:12]
outlin at the very beginning,
[55:12]
we
[55:14]
re really trying tohange
[55:15]
our thinking about our own
[55:16]
tes and trying toake
[55:17]
procs improvents like
[55:18]
litting our wat and sew
[55:19]
rate out. You know, f
[55:20]
decade we hav
[55:21]
t done that.
[55:21]
So that
[55:23]
an example, um, doing
[55:24]
better at diffent analysis o
[55:25]
the res, trackin our
[55:26]
revenues more carully,
[55:28]
lookingarefully at our costs,
[55:29]
carefull our labor costs and
[55:31]
other cos. So, uh, there
[55:32]
probably nowhere in t
[55:33]
governmenthat aren
[55:33]
t lking
[55:34]
rd at this and trying to ce
[55:35]
up withreative way to bring
[55:36]
the rates dow and to convince
[55:38]
the region to hel bring rates
[55:40]
down as welo much more to
[55:42]
come on this side.
[55:43]
And I would jt add,
[55:44]
appreciate that. Council
[55:46]
memb. U Prem, in your
[55:48]
public iues committee is
[55:51]
anher place to t aocate
[55:53]
what w can do regionally on
[55:54]
affordability. Um,
[55:55]
Cocilmember Aold, did see
[55:58]
ur hand up?
[56:00]
Uh you d, but, uh, city
[56:01]
manar coveredhere I was
[56:02]
going to saybout theegional
[56:05]
representation b Councmember
[56:08]
Pascal at Cascade. Myself at,
[56:11]
um, the solid waste, uh,
[56:13]
working Groupnd Councilmember
[56:15]
Prem at Sound City. Thanks.
[56:19]
Thk you, depy mor.
[56:20]
Od segue. I was going to d
[56:21]
isdd, uh, I
[56:23]
m tnkfulor
[56:24]
the appointment to the
[56:25]
Assoationf Washington
[56:25]
City
[56:27]
s Legislative Porities
[56:30]
Committee. U tre, uh,, on
[56:31]
behalf ofirkland, have been
[56:33]
able to evate this iss with
[56:36]
l the, uh, membe of the
[56:36]
Legislative Priorities
[56:38]
Committe andhose are
[56:40]
elted officia, city, uh,
[56:41]
statewide. And so w
[56:42]
ve gotten
[56:44]
a really goo uh, respons
[56:46]
from those other elect
[56:48]
officials. So this isecoming
[56:50]
a topic, uh,hat
[56:50]
s getting
[56:52]
elevated statede. Thanks.
[56:54]
Thank you Councmember Brown,
[56:54]
did you haveour handp?
[56:56]
Ye. One one more queion.
[56:58]
Um, s the other thing is, I
[56:59]
thk given justow many
[57:01]
factorshere are that are
[57:02]
going t be contributingo
[57:04]
this rate increase across the
[57:06]
board for allf our utilities,
[57:07]
I think what wld be helpf
[57:10]
also I like understanding kind
[57:13]
of the timin of wn each of
[57:15]
these individlactors would
[57:17]
take, would would become
[57:19]
effective so that we
[57:19]
re
[57:21]
prioritizing like, okay, you
[57:22]
kn, like t King County is
[57:23]
going to implent this rate
[57:25]
increase by next month. Oka
[57:27]
l of our eorts shouldo
[57:29]
there, and we shod focus on
[57:30]
that. So I justanted to maybe
[57:32]
derstand, le aree
[57:34]
faoring in ting as well of
[57:36]
likehen the various
[57:38]
componts could be ilemented
[57:40]
and then kind of prioritizin
[57:44]
cordingly.
[57:47]
We are I think the challenge is
[57:49]
unfortunately manyf them are
[57:52]
coming at the same tim Rig.
[57:53]
Onef the reasons we call for
[57:54]
theummit and the summit
[57:56]
occurred is that it just kind
[57:57]
of happens that all of them are
[58:00]
hitting the same tipping point
[58:01]
of maj rate increases. So I
[58:03]
thin part o the reasone ask
[58:04]
for additionalesources too
[58:06]
beart of the disssions is
[58:06]
we
[58:07]
having to enge
[58:08]
everything allt once. You
[58:09]
know, the solid waste
[58:11]
discussions,heegionalater
[58:13]
qualy discussions the
[58:13]
Cascad water les
[58:16]
scussions, andur own
[58:17]
lookg at our own work. S but
[58:19]
yes,hat isxactly wha we
[58:20]
ok at in terms of like where
[58:21]
send council memberso
[58:23]
testify or dfts tha we make,
[58:24]
or where the staff goes a
[58:25]
what theyonitor, where we
[58:25]
re
[58:26]
really trying to makeure that
[58:26]
we
[58:27]
re hitting t right things
[58:28]
at the rightime. It
[58:29]
s a great
[58:30]
point. Thank you
[58:34]
Thank you Anyone else? All
[58:36]
righ Jenny. Brooke, Amand
[58:39]
thank you very much. A, um,
[58:39]
we
[58:40]
ll see y soon. Jenny, is
[58:41]
there somethingou want to
[58:42]
add?
[58:43]
Ianted t add, uh,f we
[58:44]
uld go toust the fal
[58:46]
slide, just to wrap up, uh,
[58:47]
we
[58:47]
be coming back to you on
[58:49]
Septembe 15thith pposed
[58:51]
ras that incorporate som of
[58:52]
th levers we talked about
[58:55]
today. Uh, and then again on
[58:56]
Ocber 20t so that we can
[58:59]
veur new rat be effective
[59:00]
DECEMBER 1st for wer,
[59:03]
sewer, a on Janua 1st f
[59:04]
surface water and solid waste.
[59:06]
Thank you
[59:09]
Grea Thank you.
[59:09]
Perfect.
[59:12]
L right. Thank you. Boke
[59:15]
and Amaa. Um, we are now
[59:16]
going to move on to o second
[59:18]
study session item, which is a
[59:20]
rfect Segway. Bed on t
[59:22]
conversaon we just had, which
[59:24]
is the Kirkland Cares low
[59:26]
inme Support program update.
[59:30]
City manager.
[59:31]
Thank y, MADAM Mor. So this
[59:32]
s always goi to be a
[59:33]
business item, but we ft like
[59:34]
it actuallyade sense to have
[59:35]
it asart of thetudy
[59:36]
session, since it
[59:36]
s really
[59:38]
about the impact of theate on
[59:40]
wer income folks and als the
[59:42]
impact of this program on the
[59:43]
overall rates themsels. Tse
[59:45]
twohings are lind. Clely,
[59:46]
you want to pay close atttion
[59:48]
to both aectsf that. So
[59:49]
he to give you an update on
[59:49]
what
[59:50]
seen going o with our
[59:51]
Kirkland Ces progr and sort
[59:52]
ofext steps, we
[59:52]
re going to
[59:53]
start wh Michael Ols, our
[59:54]
Director of Finan
[59:55]
ministration, to kick us off.
[59:55]
He
[59:56]
s goi to introduce his
[59:57]
team that
[59:59]
going to speak.
[1:00:00]
Od evening, mayor,eputy
[1:00:02]
mayor a counc members.
[1:00:04]
Inn is our program
[1:00:06]
coordinator for the Kirkland
[1:00:07]
Cares Low Incom Support
[1:00:08]
ogram, ande will b making
[1:00:10]
the presentatn tonight.Nd
[1:00:12]
Tim Hansen, ourperations
[1:00:15]
mager, uh, will be available
[1:00:16]
fo questions, as wl as
[1:00:20]
myself. Go ahead.
[1:00:21]
L right.Ood evening, MADAM
[1:00:22]
Mayor and counc members. I
[1:00:23]
Quinn Glebe. I
[1:00:23]
m the curre
[1:00:24]
ogram cooinator for the
[1:00:26]
rkland Cares lowncome
[1:00:27]
pport program Ts
[1:00:28]
prentations an upde
[1:00:29]
mprising of about eight
[1:00:31]
slides fro the program And
[1:00:31]
we
[1:00:32]
ll cover t following a
[1:00:33]
ief timeline and overvie of
[1:00:34]
program activies a
[1:00:36]
administtion. Outcomes and
[1:00:37]
growth o the program over the
[1:00:39]
st two and half yea, and
[1:00:40]
potential expansion options
[1:00:41]
staff has identified for the
[1:00:46]
near fute. So, t begin with
[1:00:48]
a quick rap.Ity Couil
[1:00:50]
added $680,00 inne time
[1:00:52]
fundingo the 2023024
[1:00:53]
binial budt for t city
[1:00:55]
first Uversal utility relief
[1:00:57]
program, expandi what wast
[1:00:58]
the tim the senior Discount
[1:00:59]
progra to incde disunts
[1:01:01]
and rebates and expan expand
[1:01:03]
covege to all qualifi low
[1:01:05]
income residents The program
[1:01:06]
was designe with direction and
[1:01:07]
edback from cncil
[1:01:09]
throughout 2023 and established
[1:01:10]
by ordinance that Dember, and
[1:01:11]
then went into effect on
[1:01:14]
Januar 1st, 2024. Of t
[1:01:16]
original $680,000 budt
[1:01:18]
fundg, roughly $200,000
[1:01:20]
reins, and the languag of
[1:01:22]
ordinance 04868 stillefines
[1:01:23]
the program,dministration and
[1:01:25]
the benefs deriv. The
[1:01:26]
programas originally managed
[1:01:28]
by oside conactors,ut
[1:01:29]
came internally manag
[1:01:34]
benning in 25. So a bit of
[1:01:34]
background on program
[1:01:36]
operation. The reqrements for
[1:01:38]
elibility into the program
[1:01:39]
are Kirkland residency and a
[1:01:41]
househd income below 80% of
[1:01:42]
the area and median iome. The
[1:01:43]
ea and median income is
[1:01:44]
deteined by theepartment of
[1:01:45]
Housingnd Urban Development,
[1:01:47]
and the recalculated every
[1:01:49]
APRIL APRIL utilizing data from
[1:01:51]
the Seattle Bellevue fma, whi
[1:01:53]
corises Kin and Snohomi
[1:01:55]
counties. For026. That means
[1:01:56]
th threshold for qualification
[1:01:58]
into theirkland Cares program
[1:02:00]
woul be a gss incom of
[1:02:02]
$93,350 for a household
[1:02:04]
compsing of two people. It
[1:02:05]
goes up and down depending on
[1:02:06]
the members of t household,
[1:02:08]
so we ralculate justased on
[1:02:09]
the aunt of iividuals
[1:02:11]
within a household. Dcounts
[1:02:13]
are appli directly to Cy of
[1:02:15]
Kirkland utili accnts for
[1:02:16]
wate sew and garbage
[1:02:17]
services into the city. Bills
[1:02:19]
directlyiscounted accous
[1:02:21]
receive a 50% discoun on base
[1:02:23]
water rat, a 2 disunt on
[1:02:25]
se sewer rates, and a 40%
[1:02:27]
discount on base garbage rates.
[1:02:29]
These discounts do not alyo
[1:02:30]
a consumption charg abo the
[1:02:32]
base rate,nd the do not
[1:02:33]
apply t extraharges f
[1:02:35]
extraickups, late fees,r
[1:02:38]
shutff fees. T creation of
[1:02:39]
th Kirkland Car program also
[1:02:40]
expand covere to hseholds
[1:02:42]
and multifamilynits that are
[1:02:43]
not dirtly built by the cy.
[1:02:46]
A tse. These discounts are
[1:02:48]
realized throughebates that
[1:02:49]
the cit calculates and tn
[1:02:52]
sends to those houholds. Uh.
[1:02:53]
Furthermore, we extd rebes
[1:02:55]
to coverirkland related fees
[1:02:56]
for businesse pets, and
[1:03:00]
vehicle ristrations. As I
[1:03:01]
said, these rebates are
[1:03:02]
received throughirect check
[1:03:03]
to the svice addre of a
[1:03:05]
customer or via in-person
[1:03:07]
pickup. Rebat f utilities
[1:03:09]
ar sent on bimonthasis,
[1:03:10]
d oneime rebates for
[1:03:12]
qualified businesses, pets and
[1:03:13]
vehicle ristrations are
[1:03:15]
released o a monthly basis.
[1:03:17]
Eligilitys determined one
[1:03:17]
time at the pnt of
[1:03:19]
application and then on a
[1:03:20]
biennial basis going forward.
[1:03:23]
So this year I 2026, we are
[1:03:25]
certifyi all of t accounts
[1:03:27]
th were certified in 2024, we
[1:03:34]
certifying them. So we
[1:03:34]
ll
[1:03:35]
review the administrionf
[1:03:36]
the progr along with budget
[1:03:37]
and potenal participaon
[1:03:39]
growth As Ientioned elier,
[1:03:41]
the contract with t wh our
[1:03:42]
outside contrtororward was
[1:03:44]
not rened in025.O
[1:03:46]
resints now applied directly,
[1:03:48]
electronically or viaaper.
[1:03:49]
Application to city, to t
[1:03:53]
city dirtly. Excusee. Kurt.
[1:03:55]
Yeah, I just wanted to be clear
[1:03:57]
on that that forward. So we put
[1:03:58]
out an r f someone to
[1:04:00]
provide administration. The
[1:04:02]
privat sector. For was t
[1:04:03]
only oneho chose to apply.
[1:04:04]
D after they did it for aut
[1:04:05]
a yr, they decided it was too
[1:04:07]
hard. Theyithdrew. Sohe
[1:04:08]
reason that we ended up had to
[1:04:09]
bring it in house is we
[1:04:09]
actually didn
[1:04:10]
t have aone
[1:04:11]
else to do it. And then when we
[1:04:13]
did reach out, uh,
[1:04:14]
Councilmber Falcon had asked
[1:04:15]
me, hade tried t check in
[1:04:18]
with some folks, do this other
[1:04:20]
places a w found for folks
[1:04:21]
like Hope Lake,hey were
[1:04:23]
actually proposi to do it for
[1:04:24]
more than we could do it in
[1:04:25]
house. Soart of the rson we
[1:04:27]
resulted wit the temporary
[1:04:28]
prram coordinat was we
[1:04:29]
found it to b the lst
[1:04:31]
expeive way we could do it,
[1:04:34]
at leastt that te.
[1:04:35]
Thank you f the
[1:04:38]
clarifation. Gre.O, as
[1:04:39]
Kurt mentioned, the city has
[1:04:41]
hired aemporary program
[1:04:41]
coordinar to assis in
[1:04:42]
administering the program
[1:04:44]
thugh 2026. Tt
[1:04:44]
s me
[1:04:46]
speang to you n. And the
[1:04:47]
ty continues to accept
[1:04:48]
apications, provideupport
[1:04:50]
and process recring payments
[1:04:51]
to allpplicants to the
[1:04:55]
prram. U this include all
[1:04:56]
certification, all payment
[1:04:57]
processing, all elibility
[1:04:59]
screening, and all outreach of
[1:05:03]
e program.T this time. S
[1:05:05]
brie program summary over t
[1:05:06]
last twond a half years, the
[1:05:08]
program has expdedoverage
[1:05:09]
of the disunt a rebate
[1:05:10]
programs to over 1000 total
[1:05:11]
hoeholdsver thosewo
[1:05:14]
year 792 households now
[1:05:16]
qualify for direct discounts on
[1:05:18]
utility rates, and acrs those
[1:05:21]
households641,052 were
[1:05:22]
discounted fro utility
[1:05:24]
chars. Between 2000 and 24
[1:05:26]
and t end of Je 26, a
[1:05:28]
this yea these discounts do
[1:05:30]
not impact the proamudget
[1:05:31]
because they are realized
[1:05:32]
thugh a lack o revenue from
[1:05:33]
utility charges rather than
[1:05:35]
rebated from therogram budget
[1:05:37]
directly. The avera discoun
[1:05:38]
per houseld is somewhat
[1:05:40]
bifurcated based on the
[1:05:42]
services a houseld can
[1:05:44]
receive. S for instance, I a
[1:05:45]
usehold is in a Nordsom
[1:05:46]
Utility Distric oroodinville
[1:05:47]
Water Distrt service area,
[1:05:49]
an receiving water a sewer
[1:05:50]
services fromhose utility
[1:05:52]
providers, they qualify for
[1:05:53]
less discounts because they are
[1:05:54]
provided les services from t
[1:05:56]
city ofirkland. That being
[1:05:58]
said, a water dcount for a
[1:05:59]
single family resence is
[1:06:02]
about $25.74 per billing cycle.
[1:06:03]
For a sewer discount, it
[1:06:06]
$41.38, a the mos common
[1:06:07]
type of gbage serce, a
[1:06:08]
weekly 3 gallon pkup is
[1:06:12]
$42.06 p a per billing cycle.
[1:06:12]
So that
[1:06:14]
s t months. A garge
[1:06:15]
only account with the most
[1:06:16]
commonype of garge pickup
[1:06:19]
willeceive $252.36 in
[1:06:21]
diount annlized, while a
[1:06:22]
single family residence
[1:06:24]
reiving a water and sewer and
[1:06:25]
garbage svice from the city
[1:06:28]
will receive $655. In tal
[1:06:32]
discnts on an annual basis.
[1:06:34]
Over that se timeeriod,22
[1:06:36]
excuse me, 229 total households
[1:06:38]
quified f bimonthly utity
[1:06:40]
rebate ccks. Recurri
[1:06:41]
utility rebes arealculated
[1:06:42]
city code and based o the
[1:06:44]
bedrm size of the unit and
[1:06:45]
the utility service provided a
[1:06:47]
curring utility rebat for
[1:06:48]
garbage only aount will
[1:06:51]
result I $120 in total rebat
[1:06:53]
on an aualized basis, while a
[1:06:54]
one bedom apartment receiving
[1:06:55]
ter, sewer, and garba
[1:06:56]
servicesrom the City of
[1:06:57]
Kirkla will recve, on
[1:07:00]
average, $360 in annua utility
[1:07:03]
rete. And then we also, as I
[1:07:04]
mentioned earer, provi
[1:07:05]
business patent vehicle
[1:07:07]
liceing rebat. These
[1:07:08]
rebates are alied aft
[1:07:09]
initia payment by the
[1:07:11]
cuomer, a then a reipt is
[1:07:12]
provided to the cit toet us
[1:07:14]
know that theaymentas made.
[1:07:16]
Um. However, will note tt
[1:07:17]
on business and peticenses,
[1:07:19]
the cy alsorovides
[1:07:20]
discounts to certain customers
[1:07:22]
front, unrelated to the
[1:07:24]
Kirklandares progr. So we
[1:07:26]
see less utilizati of
[1:07:27]
business licen rebates and
[1:07:28]
pet license rebates for those
[1:07:33]
reasons. Soere we c see
[1:07:35]
just a graph of ovell proam
[1:07:36]
growth. As I mentioned earlier,
[1:07:37]
the program has expanded eac
[1:07:39]
year since its creion fro
[1:07:41]
the origina 277 senior
[1:07:43]
discount aounts I 2023,
[1:07:45]
ding 396 total account in
[1:07:47]
2024, 199 total accnts in
[1:07:51]
2025, and49 account in the
[1:07:53]
fit half of 202 These
[1:07:55]
totalseflect the total of new
[1:07:56]
applications less the accnts
[1:07:58]
at are removed from the
[1:07:59]
prram due to failure to
[1:08:01]
recertify oror informing us
[1:08:02]
of a household change that
[1:08:03]
imcts their egibility for
[1:08:04]
th program, sh as a mov
[1:08:05]
outsid of Kirkland or a change
[1:08:07]
income eligility. The
[1:08:08]
jority of aount gwth has
[1:08:10]
been driven by residts and
[1:08:11]
single famy residence
[1:08:13]
although0% of the progr
[1:08:14]
totals are multi-family
[1:08:15]
sidences, such as apament
[1:08:17]
complexes, and then a breakwn
[1:08:19]
of those 792 accounts tha are
[1:08:20]
receiving direct utility
[1:08:23]
discounts, 792 of those are
[1:08:25]
garbageccounts, 444 also
[1:08:27]
receive waterervices, and 379
[1:08:29]
of the receive sewer services
[1:08:35]
om the city So the outreh
[1:08:35]
th we
[1:08:36]
ve conducted over the
[1:08:37]
past year and a hal we
[1:08:37]
ve
[1:08:38]
used seral differe avenues
[1:08:39]
to try and expand knowledge
[1:08:40]
abou the program locally and
[1:08:42]
crease participati in the
[1:08:43]
community. This includes
[1:08:45]
distinct oneage mairsith
[1:08:46]
a maile with program
[1:08:47]
information that a company re
[1:08:48]
chan, letters to alltility
[1:08:50]
account holrs. We believe
[1:08:51]
this was particurly efftive
[1:08:52]
at the binning of this year,
[1:08:53]
and increing program
[1:08:55]
participation, and intend to
[1:08:56]
repeat the eort with fure
[1:08:57]
te change lters. We
[1:08:58]
velso
[1:08:59]
inuded blurbs inhe
[1:08:59]
Kirkland
[1:09:00]
s newsletter, and
[1:09:01]
staff has appeared on Thiseek
[1:09:03]
in Kirand Podsts.O our
[1:09:04]
thanks and shout outs t the
[1:09:06]
communationseam and cmo for
[1:09:08]
lowing us too that.Taff
[1:09:09]
has alsoone direct outreach
[1:09:10]
via site visits a
[1:09:11]
multi-mily facities and
[1:09:13]
aparent complexesn order t
[1:09:14]
directly assist residents with
[1:09:16]
applicatns and questions,
[1:09:17]
whh drove muc of the rebat
[1:09:18]
acunt growth that we saw in
[1:09:21]
2025. Finally, staff has met
[1:09:22]
with various local
[1:09:23]
organizations to determine if
[1:09:24]
the are potentials for
[1:09:25]
expansion or collaration
[1:09:27]
betweenur programs. That
[1:09:28]
inudesing County Housing
[1:09:30]
Authority, regional coalition
[1:09:31]
for housingorth Shore
[1:09:32]
Utility District, Puget Sound
[1:09:34]
Energy, andoodinville Water
[1:09:40]
strict. So this is t final
[1:09:40]
slide.Nd this is wre we
[1:09:41]
ll
[1:09:43]
discussur continued efforts
[1:09:44]
to lk at other way to expan
[1:09:45]
the program, both within
[1:09:46]
Kiland itself and pentially
[1:09:47]
involving other utility
[1:09:50]
district Sohe first oion
[1:09:52]
at we have, and one that we
[1:09:53]
intend on pursuing most
[1:09:54]
readily, is usingata thatas
[1:09:55]
colled between the Public
[1:09:57]
Works Service Wat Team and
[1:09:58]
the King Count Assessors
[1:10:00]
operty tax information. Uh,
[1:10:02]
ing that, we identified 500
[1:10:03]
househds that wou qualify
[1:10:05]
for t direct utili disunt
[1:10:07]
thato noturrently, uh, have
[1:10:08]
not enrolled in the progr.
[1:10:10]
And thenn additional 200
[1:10:10]
households thatould qualify
[1:10:12]
for bimthlytility rebates
[1:10:13]
that have not qualifiedor the
[1:10:15]
prram. This opportunity I a
[1:10:16]
lile unique in that w
[1:10:16]
re
[1:10:17]
utilizg the assessor
[1:10:18]
determination forroperty tax
[1:10:21]
exemptions in 2024nd 2025,
[1:10:23]
which was period tha the
[1:10:25]
property tax emption
[1:10:28]
ineased by $30,000 to $84,000
[1:10:30]
tota and bame gater than
[1:10:31]
the Kirkland care pgrams
[1:10:32]
lowest incom qualificati
[1:10:36]
level of $81,700. So tha means
[1:10:39]
that for 202 the 800, the 700
[1:10:39]
householdse
[1:10:40]
ve identified are
[1:10:41]
more oress guaranteed to
[1:10:42]
quify for the King County o
[1:10:45]
the Kirkland Cares program.M,
[1:10:46]
because the assessor
[1:10:48]
eligibily criteri is more
[1:10:50]
stringent tn our program is.
[1:10:51]
Um, so staff is currently
[1:10:53]
woing through options to to
[1:10:55]
onboard these00 houselds
[1:10:58]
most efficiently. T secd
[1:10:59]
tion that we he is a
[1:11:01]
pontial expansion into, uh,
[1:11:03]
the North Shore Utility
[1:11:06]
Dirict service area. U
[1:11:07]
right now Kirkland Cares
[1:11:09]
programnly provides discounts
[1:11:10]
and rates to Kirkland
[1:11:11]
provid garbage services in
[1:11:13]
therea, but cit code could
[1:11:14]
be amended to allow for
[1:11:15]
paents to North Shore Utity
[1:11:16]
District custors forhe
[1:11:17]
differce between the amoun
[1:11:20]
that North Shore customers pay
[1:11:21]
and recei andiscount, and
[1:11:23]
e amount tt Kirkland Cares
[1:11:24]
customers wou receive in
[1:11:26]
discount. Uh, because of the
[1:11:27]
differce in utity pcing
[1:11:28]
between our aas,he
[1:11:29]
differen in discount amounts,
[1:11:30]
and the difrence in pgram
[1:11:31]
eligibility requirements. This
[1:11:32]
would requi review on a case
[1:11:34]
case basis for each North
[1:11:35]
Shore Utity Distric
[1:11:36]
cuomer, determine whether or
[1:11:37]
not they
[1:11:37]
relready receiving
[1:11:39]
Nort Shore discounts and what
[1:11:41]
theifference betwe that
[1:11:42]
North Shore discount and our
[1:11:43]
discount is. We
[1:11:44]
ve included
[1:11:45]
that as an aachment to our
[1:11:48]
memo to council today. Um,e
[1:11:51]
alsootentially require a data
[1:11:52]
sharing agreeme between us
[1:11:52]
an North Shore utility
[1:11:54]
districts that we wouldnow.
[1:11:55]
Uh, the custome list of
[1:11:56]
everybodyhey have w on
[1:11:58]
discounts. We
[1:11:58]
ve also discussed
[1:12:00]
the possilityf ahared
[1:12:01]
application portal so that
[1:12:02]
anybody that applies t North
[1:12:03]
ore would automaticlypply
[1:12:04]
fo the Kirkland Ces program.
[1:12:06]
But we hav not gon down that
[1:12:09]
enue just yet. Thirdly, we
[1:12:10]
intend to re-amine the
[1:12:12]
utilit rebate calculation
[1:12:13]
uh, in t coming yrs. This
[1:12:15]
is becau the direct utility
[1:12:17]
diountshat weive to
[1:12:18]
Kirkland customers are bas on
[1:12:19]
percentages, andhus
[1:12:20]
aumatically update wnever a
[1:12:22]
new utility rates adopted by
[1:12:23]
the council. Hever, the
[1:12:25]
amount of utility rebate per
[1:12:26]
household is defined by cy
[1:12:28]
de specifically, and so that
[1:12:29]
was last determined when the
[1:12:31]
ordinance was voted onn 2024.
[1:12:33]
Astility cross increased year
[1:12:34]
to year,hese rebates will
[1:12:36]
begin to lag. Uh, the discount
[1:12:37]
amount tha we intend and so
[1:12:38]
will need to be rxamined and
[1:12:41]
re determined. Finly, staff
[1:12:42]
will continue to cduct
[1:12:43]
outreach and pross pments
[1:12:44]
and application throughou
[1:12:46]
20 while worng on potenal
[1:12:49]
administtion optionsor 2027
[1:12:54]
and028. And finally, I
[1:12:54]
d like
[1:12:55]
to leave it on for any
[1:12:56]
questis in discussionou
[1:12:57]
mightave.
[1:12:59]
Thank you. Quinn. This
[1:13:01]
really proud of ts program,
[1:13:01]
and I
[1:13:03]
m very impressed with the
[1:13:04]
treach and a the workhat
[1:13:04]
you
[1:13:05]
ve done t expand this
[1:13:06]
program. The
[1:13:07]
s oiously a
[1:13:09]
clear need. Um, Councilmber
[1:13:12]
Falc, thank you MADAM Mor.
[1:13:12]
We.
[1:13:13]
Thank you, Quinn. First of all,
[1:13:15]
I know thi is a lot of wor to
[1:13:16]
ministerhis program. I can
[1:13:18]
imagin a lot of details.
[1:13:20]
Right. Um, goi through income
[1:13:21]
verification and all of that is
[1:13:23]
not anasy process. S tnk
[1:13:25]
you for that. Um,
[1:13:25]
mappy to
[1:13:26]
hear that we
[1:13:26]
re signingore
[1:13:27]
people up. I think that
[1:13:30]
od thing. Even bed on, um,
[1:13:31]
stateed. Tha
[1:13:31]
s a good
[1:13:33]
thing. Rht? But w know,
[1:13:33]
sadly, that the
[1:13:34]
s also
[1:13:35]
growing need, right Which is
[1:13:37]
how this, you kno nely ties
[1:13:38]
into our former,m,
[1:13:40]
diussion. Our last agenda
[1:13:42]
item. Um, and I really
[1:13:43]
appreciateou to inhe memo
[1:13:44]
where youalked about being
[1:13:46]
prctive in identifying other
[1:13:47]
ople who m qualify for the
[1:13:48]
programs well. I know we
[1:13:50]
doing a l of thatlready.
[1:13:52]
But tnkingf, you know, how
[1:13:54]
se can wind folks who MAY
[1:13:56]
be eligible for this progr? I
[1:13:58]
apprecia you mentioning the,
[1:13:59]
um, the shared portal. I think
[1:14:00]
that
[1:14:01]
s areat idea. Um,ou
[1:14:02]
know, I, I think it
[1:14:03]
s important
[1:14:05]
for u twofold to ruce o
[1:14:06]
administtive costs,ut also
[1:14:08]
to reduceurdenor
[1:14:09]
apicants. Rht. Who w know
[1:14:11]
that thosehat live with a low
[1:14:13]
income have a lot of perwork
[1:14:15]
and a lot of phonealls a a
[1:14:16]
t of, younow, things, a lot
[1:14:18]
of red tape to qualify for the
[1:14:19]
programs that the so
[1:14:20]
desperately need jt to
[1:14:22]
survive. Um, inur community.
[1:14:24]
So I appreciate that tt
[1:14:25]
shared portal cld potentially
[1:14:27]
address both o thosehings.
[1:14:28]
Um,ecause oiously our our
[1:14:29]
administration, o
[1:14:31]
admistration costs here are
[1:14:32]
pret high proportion of the
[1:14:34]
budget. And anything we can do
[1:14:35]
to reduce that. Wonde if in
[1:14:37]
the meaime, I mean, loong
[1:14:38]
atike the folks who already
[1:14:39]
quifiedor not at like the
[1:14:42]
50% Army, do we have tou
[1:14:44]
know, um, means test them if
[1:14:44]
they
[1:14:46]
ve aeady qualied for
[1:14:48]
that, can we automatically
[1:14:49]
accept them without having to
[1:14:51]
go throughur process t save
[1:14:53]
againn burden onhem and
[1:14:56]
administrave cos on us?
[1:14:58]
So the short answers yes,
[1:14:59]
based on cityode, athing
[1:15:01]
that the Dector of Finance
[1:15:02]
deem accepble, for our
[1:15:04]
purposes, we cou use. So for
[1:15:05]
instance, we do already use,
[1:15:07]
uh King County property tax
[1:15:09]
exemptions. Um, we could als
[1:15:11]
useodes exempt exemptions in
[1:15:13]
der to, uh, get these people
[1:15:14]
on the program The biggest
[1:15:15]
barrier t that right now would
[1:15:17]
just be getting a lt from
[1:15:18]
Knud, um, whichould require
[1:15:19]
somethingike a dataharing
[1:15:21]
agreement. A they have
[1:15:21]
mentionedhey
[1:15:22]
re willing too
[1:15:23]
so. W would just nee to go
[1:15:25]
thugh those legal barrier
[1:15:25]
Yeah, that wou be great for
[1:15:27]
us t do that. Um, to beble
[1:15:28]
, as I said, se both
[1:15:30]
administrative cost and, and
[1:15:32]
burden to them. So tnk you I
[1:15:34]
apeciate being proacve and
[1:15:36]
I and, love the idea of a
[1:15:37]
shared portal, but I wld love
[1:15:39]
that fors manf these
[1:15:40]
differenturisdictions a
[1:15:42]
entiti ase possibly could.
[1:15:44]
Ain, just to haveore of an
[1:15:45]
economyf scale savings there.
[1:15:48]
So thank you.
[1:15:49]
Thk you,ouncilmember
[1:15:50]
Pascal.
[1:15:52]
Yeah, yeah, tha you for the
[1:15:54]
presentation. Um, and
[1:15:56]
information that you shared.
[1:15:56]
, I
[1:15:57]
moing to kd of bui
[1:15:59]
off of aittle bitf what
[1:16:00]
Councilmber Faln was
[1:16:03]
taing about. And, um, you
[1:16:04]
know, the one thing Iuess
[1:16:06]
that that that surprised me a
[1:16:06]
little bitasn
[1:16:07]
t I mean, I
[1:16:07]
wasn
[1:16:08]
t surised abo the
[1:16:11]
need, um, that, uh, and, and
[1:16:12]
the fact that that
[1:16:12]
likely
[1:16:14]
goingo increase wit somef
[1:16:16]
the utity costs that, that
[1:16:19]
were that were forecasting, um,
[1:16:21]
bu I was aittle surprised by
[1:16:23]
the admintrative costs. Uh,
[1:16:27]
it looked like 3,000, um,
[1:16:29]
betwee024 and 2026, uh,
[1:16:31]
ich seemed to represent a
[1:16:34]
pretty good chunk of of the
[1:16:37]
available funding. And so I, I
[1:16:38]
know tt you tald about
[1:16:40]
reducing tho administrativ
[1:16:41]
costs. I just want to emphasize
[1:16:42]
that I tnk that
[1:16:43]
d be good,
[1:16:43]
but I don
[1:16:45]
t want too it at
[1:16:47]
the expense of, um, makg se
[1:16:50]
thate continu to he a
[1:16:53]
progra um, and monitorhose
[1:16:55]
that participate in an
[1:16:57]
efficient way.M, but my ask
[1:16:59]
isust to is justo track
[1:17:00]
that over time to s how w
[1:17:03]
are reducg costs, um,ow
[1:17:04]
effectivee are being. So as
[1:17:07]
long as w So, sohe point
[1:17:07]
is,et
[1:17:08]
s just continue
[1:17:09]
tracking that and showing how
[1:17:10]
we
[1:17:11]
re making proess tards
[1:17:11]
that. That
[1:17:12]
be helpful. Thank
[1:17:16]
you.
[1:17:18]
City mager.
[1:17:22]
Ah. Um, so Iust thank you
[1:17:23]
for those comments. I do want
[1:17:24]
to add tha we also highlighted
[1:17:25]
adnistrativeosts, but one
[1:17:27]
of t things tt is impornt
[1:17:28]
to note is the primary part of
[1:17:31]
that cost I actually quits.
[1:17:32]
D he has done an
[1:17:34]
extraordary job not justf
[1:17:35]
reewing eligibity and
[1:17:37]
stuff, butlsohis all the
[1:17:38]
market, evething was much
[1:17:39]
talked about pretty muc was
[1:17:40]
also his work and trying to
[1:17:43]
reach out to folks. Soe did
[1:17:45]
work reall hard t try toind
[1:17:46]
anlternative way to provide
[1:17:47]
th service. And as said, we
[1:17:47]
didn
[1:17:49]
t get a proposers. And
[1:17:50]
then whe we reachedut to
[1:17:51]
folks and wand to charge us
[1:17:53]
more. So when we askedveryone
[1:17:54]
else likee did 2 or 3 people
[1:17:57]
to do that. So we I careery
[1:17:58]
mu about the admintrative
[1:17:58]
cost. We
[1:17:58]
re going to lookor
[1:18:00]
creative ways to bng that
[1:18:01]
down, but w haven
[1:18:01]
t quite
[1:18:03]
fired out that. Not yet. And
[1:18:04]
then the final thing I
[1:18:04]
day,
[1:18:06]
in terms of t overall cost,
[1:18:07]
what is n really shown on
[1:18:09]
at lists theoregone
[1:18:11]
renue tt people get because
[1:18:12]
they get theiscount. Sot
[1:18:14]
acally a bette number than
[1:18:15]
it looks, because we
[1:18:15]
re
[1:18:17]
basically, um, that
[1:18:17]
s the one
[1:18:19]
that cameut of theot you
[1:18:19]
gave us.Ut it
[1:18:20]
s not the
[1:18:20]
discounts everybody
[1:18:22]
receivg. So but, but s know
[1:18:24]
at we definitely want to find
[1:18:25]
a way to bring our numbers down
[1:18:28]
if w can.
[1:18:32]
Than you. Anyone else? Qnn,
[1:18:34]
you are doing an excellent job
[1:18:35]
on this. I really areciate
[1:18:37]
. Um, you MAY have said thi
[1:18:40]
in your presentatio b are
[1:18:41]
there.H, Councilmember
[1:18:42]
Falcon I
[1:18:42]
m sorry I didn
[1:18:43]
t see
[1:18:43]
u, but I
[1:18:43]
ll gohead and
[1:18:47]
fish. Um, are there other,
[1:18:49]
uh, are you getting ruests
[1:18:51]
om applicants for oerypes
[1:18:54]
of of relief? Ishere anything
[1:18:55]
coming u that we
[1:18:55]
re not
[1:18:59]
capturgow?
[1:19:00]
I would say t greatest amoun
[1:19:01]
of requests that we get that
[1:19:03]
areutside our current, um,
[1:19:05]
ability too anything about
[1:19:06]
our is reay just eanded
[1:19:08]
discounts ofhat we alrea
[1:19:09]
pride. Um, or
[1:19:10]
misunderstandis abouthe
[1:19:12]
Kirknd related nature ofhe
[1:19:14]
fees. So, for instance, for the
[1:19:14]
vehicle registratio we
[1:19:15]
re
[1:19:16]
on rebuilding that $20ee
[1:19:18]
that t Cy of Kirklan
[1:19:20]
sessesn a car registration.
[1:19:21]
Uh, oen when people hr
[1:19:21]
abou the program, they
[1:19:22]
ll
[1:19:23]
hear, you know, oh, I can get
[1:19:24]
help with my vehic
[1:19:25]
regiration. A the cost is
[1:19:26]
inhe hundreds o dollars.He
[1:19:28]
$20 fee well appreciated isot
[1:19:30]
what somebody igineshen
[1:19:31]
they hr about tha Um, for
[1:19:32]
her city servis,e don
[1:19:34]
hear or I have not heard as
[1:19:37]
much. Um, but we have tried to
[1:19:39]
increase ourommunication
[1:19:40]
about exactly what we provide
[1:19:43]
to try and limit uh, you know,
[1:19:44]
those sort of situations going
[1:19:45]
forward.
[1:19:48]
Ay. Tha you. Councilmeer
[1:19:49]
lcomb.
[1:19:50]
Ank you, Mad Mayor. Um,
[1:19:52]
thank you for the elanation,
[1:19:53]
Kw. And als um, city
[1:19:55]
manager for your remksbout,
[1:19:57]
you know, the costs driver
[1:19:57]
being Quinn
[1:19:59]
s pition. Right?
[1:20:00]
Which is reall important. But
[1:20:02]
do think as w as w talked
[1:20:03]
about theeed contiing to
[1:20:05]
ow, not oy le, and, you
[1:20:06]
know, as Quinn,s you were
[1:20:07]
talking about just the, the
[1:20:10]
overall cost per custome or
[1:20:12]
r p resident.Ight. U
[1:20:13]
thathat dollar value will
[1:20:14]
likely increas butlso the
[1:20:16]
number of residents who qualify
[1:20:18]
MAY also likely increase. So I
[1:20:20]
see this as a, um, you know,
[1:20:22]
how to make your positio as
[1:20:23]
efficient as possiblight?
[1:20:25]
And so as we grow, even if t
[1:20:27]
dollarmount remai theame,
[1:20:28]
you know, plus, younow,
[1:20:30]
annual, younow,m, pay
[1:20:32]
increase, that the percentage
[1:20:33]
would drease becauhe
[1:20:34]
tol pie is goingo be
[1:20:35]
rger. So your percentage of
[1:20:36]
theie that is the cost of
[1:20:38]
yo time wld be slightly
[1:20:39]
ss. Like we alrdy talked
[1:20:39]
about what som of the other
[1:20:41]
things. But also I
[1:20:41]
d love for
[1:20:43]
uso look a insteadf
[1:20:45]
anally every t years. Doing
[1:20:46]
means testing, right? I know
[1:20:47]
at there
[1:20:47]
s predent f that
[1:20:49]
in se other organizatns
[1:20:51]
at do means testing. That m
[1:20:53]
save youome time,nd also
[1:20:54]
like to lookt what oer
[1:20:56]
citi are doing to to expand
[1:20:57]
me sort of shad portal,
[1:20:57]
ght, to seef this is
[1:20:59]
something we cld encourage in
[1:21:00]
other cits, whichs be good
[1:21:02]
for residents Um, but alsoo
[1:21:04]
help economies ofcale. S
[1:21:07]
again, tha you so muc.
[1:21:08]
Thank you, Councillo Tim
[1:21:12]
Chisho. Did I see your hand?
[1:21:16]
Okay. All right. Anyone else?
[1:21:18]
All rht. Quinn, are you. Is
[1:21:19]
that it?
[1:21:20]
That
[1:21:20]
s all
[1:21:20]
ve got. Thank you.
[1:21:21]
Counl.
[1:21:26]
Awesom Thank so much. Oka
[1:21:27]
we are concludinur study
[1:21:29]
sessio a fewinutes early.
[1:21:30]
Intenancnd upgrade
[1:21:32]
unrway iouncil Chamber.
[1:21:34]
Duri the meeting,e MAY te
[1:21:35]
iefreaks as needo
[1:21:37]
address any thnical issue
[1:21:39]
and hp eur tt the
[1:21:40]
mein proeds smoothly as
[1:21:43]
possible. Io see a number of
[1:21:45]
people in Rose Hilloo
[1:21:47]
Thank you foroinings. Um,
[1:21:49]
we d not he a
[1:21:51]
prlations on our agenda, s
[1:21:52]
we w start tonight
[1:21:53]
s regular
[1:21:54]
meg withtemsro the
[1:21:58]
dience So this is aime in
[1:21:59]
our meetinghen weorlly
[1:22:01]
he from tublic. Pase
[1:22:03]
limit you remarkso three
[1:22:04]
minute We wilrovide up t
[1:22:06]
a total of 45 mutes for our
[1:22:08]
items fm the audienc With
[1:22:10]
no mor than six sakersn a
[1:22:11]
subject, regdless ofheir
[1:22:13]
sition on theubject. To
[1:22:15]
address the Counc during this
[1:22:17]
item tohe audiee, plee
[1:22:19]
sign up using tnline public
[1:22:21]
mment instrucon link. Your
[1:22:23]
fit and last nam displayed
[1:22:25]
in zoom must match t
[1:22:28]
gistrati form for those
[1:22:29]
paicipatin byhone,lease
[1:22:31]
altar nin to b rognized
[1:22:33]
topeak. Ims fro the
[1:22:34]
audice I a importa part
[1:22:36]
of o busins meeti.E ask
[1:22:38]
at everyee treed with
[1:22:40]
kindness andespect.Leaseo
[1:22:42]
not cp o applar
[1:22:43]
herwise openl eress your
[1:22:45]
agreemen or disagreemen with
[1:22:47]
the saker. Wn ttappens,
[1:22:49]
even wheupporting a speaker
[1:22:51]
it c beisruptiv of t
[1:22:53]
meeting and discourag other
[1:22:54]
fromharing a different
[1:22:57]
viewpot. We discourage peopl
[1:22:59]
from using obsceniti and
[1:23:01]
making pernal attacks again
[1:23:03]
hers, and we ask that you
[1:23:04]
direour cments to
[1:23:06]
cocil, not to sff or
[1:23:08]
auence members. In additio
[1:23:10]
cause ty can be disptive.
[1:23:12]
Gns and placard a not
[1:23:14]
alwed in cncilhambers o
[1:23:16]
the Ros Hl Room ding our
[1:23:17]
meetgs, regaress of their
[1:23:20]
contens reminr,tate
[1:23:23]
law ds not aow items from
[1:23:24]
the audienco be use f
[1:23:27]
omoting, oosing, o
[1:23:28]
diussing a candida
[1:23:32]
campgn or balt prosition.
[1:23:34]
Kiland prides ielf oneing
[1:23:35]
a respectful, welcong
[1:23:37]
commity. We want eryone to
[1:23:39]
feel like the belon in
[1:23:41]
Council chambsr the Rose
[1:23:43]
Hi Room, expressin the
[1:23:45]
view points.Ity clerk w do
[1:23:48]
haveigned up to speak?
[1:23:49]
Than you, Mad Mayor. Athis
[1:23:50]
point, we do have 12 guests
[1:23:51]
wishing to spe. We
[1:23:52]
llake
[1:23:54]
the fst threen ts oer.
[1:23:56]
Christy Bckett followings
[1:23:58]
on site. Jer, n oite.
[1:24:00]
D also Alia Ramirn
[1:24:01]
te. Pleepproach the
[1:24:15]
podium.
[1:24:17]
Welcome, Cisty. Aou can
[1:24:19]
see the timernhe springr
[1:24:19]
on t screen.
[1:24:21]
I do, thank you.
[1:24:23]
Than you. Go ahead
[1:24:24]
Hi. My name is Cisty
[1:24:26]
Draycotty fily lives at
[1:24:29]
50 130th Avee Northst,
[1:24:31]
whic is rhtgainst the
[1:24:32]
uthern bouary of the South
[1:24:35]
Reservoir water tow site. I
[1:24:38]
writing t ask for yr help in
[1:24:39]
findin aetterutcome for a
[1:24:40]
seris pblem wit the
[1:24:43]
cuent pject dign.Ur
[1:24:44]
home iseparated fm the
[1:24:46]
reservoir by a gve of mature
[1:24:48]
westn rededars. For
[1:24:49]
generatis,his gve has
[1:24:51]
screened our home fro t tan
[1:24:53]
and itsarbed wire securit
[1:24:55]
fence.Tas also sheltered
[1:24:57]
wildfe, iludingywn
[1:24:58]
chilen,limbing and swinging
[1:25:00]
in tir brancs. As currently
[1:25:02]
signed, t proctould
[1:25:04]
remo allfhe trees between
[1:25:05]
ourouse and the water tow
[1:25:07]
stcture. It would also
[1:25:10]
locate thearbed wirence
[1:25:11]
ght up to the propert
[1:25:13]
boundary which is aere 13f
[1:25:17]
from our bedom winw. If the
[1:25:18]
fence werovedn top o the
[1:25:20]
bounry, I would lea us n
[1:25:22]
abily to plant anything to
[1:25:24]
screen our propey from a
[1:25:26]
barbed wire fen. And allf
[1:25:28]
that ade, I actuay want t
[1:25:30]
talk abouthereeshat are
[1:25:32]
atedoremoval.M, the
[1:25:32]
ty
[1:25:34]
srborist rortid n
[1:25:36]
asse t western rededar
[1:25:37]
grove thatits bweeny
[1:25:40]
housndheeservoir. Um,
[1:25:41]
thgh thi grove is on the
[1:25:41]
city
[1:25:42]
s propey, it can
[1:25:44]
currtly onlye aessed from
[1:25:46]
ou propert And it
[1:25:46]
clear
[1:25:48]
om the absence of sufficit
[1:25:48]
analysis in the city
[1:25:49]
s rept
[1:25:50]
that ts gro was mostly
[1:25:52]
nored when the team riewed
[1:25:53]
th propose water ter
[1:25:55]
designs. W hired o own
[1:25:57]
nsulting aorist, wch
[1:25:59]
domented nin high retention
[1:26:01]
value tre in the grove. Six
[1:26:03]
of them are landmk tes,
[1:26:04]
whh are tes mearing
[1:26:06]
larger tn 26I in trunk
[1:26:08]
diamer at bast heit. Uh,
[1:26:09]
th ones I
[1:26:10]
malking abore
[1:26:11]
quearger than that. The
[1:26:14]
diamet I as large ay arms
[1:26:15]
spread out. Tserees are
[1:26:20]
gantic. Um, uh, the thr of
[1:26:21]
the trees tha are dignated
[1:26:23]
oresignate landmarrees
[1:26:25]
are misng entiry from the
[1:26:25]
ty
[1:26:27]
s invento. So far, cit
[1:26:28]
staf have acknoedged the
[1:26:30]
cuent repors deficient
[1:26:32]
t no commitmt has bee made
[1:26:33]
to correct the dign or
[1:26:35]
mitigate the outcome. And a
[1:26:36]
thgs stand the city is
[1:26:38]
reing on arroneous repor
[1:26:40]
and weelieve vioting its
[1:26:41]
own tree ordinance,hich is
[1:26:44]
chter 9, I I proces to
[1:26:46]
be car,eupport t cy
[1:26:48]
mataining its wer
[1:26:49]
inastructure. What we
[1:26:49]
re
[1:26:50]
asking f is dign tha
[1:26:52]
preservehe gve and
[1:26:54]
prectshe buffer between our
[1:26:56]
mendhe facily. And I
[1:26:56]
don
[1:26:58]
t nee toell you, Inow
[1:26:58]
thathere
[1:26:59]
s no rlacing
[1:27:02]
healthy 100 plus year old
[1:27:03]
ees. Fores healt
[1:27:04]
specialis heoted
[1:27:06]
significant western red ced
[1:27:07]
dieback I theacific
[1:27:09]
rthwest sce 2017 due to
[1:27:11]
imatehange and hotter,
[1:27:12]
drier summers which w
[1:27:12]
re
[1:27:14]
experienng rig n. A our
[1:27:16]
borist reportays out. Young
[1:27:17]
Wester rededars, the kin
[1:27:19]
theity keeps assings wil
[1:27:21]
be rlanted,ave vy low
[1:27:23]
survival rates Welso know
[1:27:25]
that new tes simpllanted
[1:27:26]
nexto eachther doesot
[1:27:28]
constite gve, nor mim
[1:27:29]
the benits of one Older
[1:27:31]
weerned cedar needo be
[1:27:32]
replacedecause t new ones
[1:27:33]
are dying.
[1:27:35]
Istie, I apologi.Ourime
[1:27:36]
is u
[1:27:36]
That
[1:27:36]
s okay.
[1:27:37]
Thk you
[1:27:38]
Thank you for your pasonn
[1:27:40]
tree And I know ttulie
[1:27:42]
Underwood, our pubc works
[1:27:44]
direor, plans toome wk
[1:27:45]
th site with you.
[1:27:46]
. Thank y.Eah, I would
[1:27:47]
invite anye thatants to
[1:27:49]
co outny time. Thank you so
[1:27:49]
mu.
[1:27:51]
Fo your te
[1:27:55]
Jerry. N.
[1:27:55]
. I
[1:27:56]
m Jerry, notepresenting
[1:27:58]
the Miner Condoniumsext
[1:28:00]
to Mina Park on Kkland
[1:28:02]
Aven. Itiallyanted to
[1:28:03]
exprs o conrns authe
[1:28:06]
exce noisereated by loud
[1:28:07]
bo music and lar gros of
[1:28:09]
peopleittingn the dk late
[1:28:12]
at night aft0:00, the same
[1:28:13]
3 or 4oats tie upt the
[1:28:15]
entrce end of the dock, wch
[1:28:16]
is dirtly below t weste
[1:28:19]
units ofhe Mariner. Comen
[1:28:22]
baby, theolice eorce the
[1:28:23]
stanrd residential nse
[1:28:24]
rus in Kirklan butou hav
[1:28:26]
to call the nonmergency
[1:28:27]
mber toegister a complaint
[1:28:29]
with the Kirklan polic We
[1:28:31]
callhis nber many times
[1:28:32]
during the sumr, a t
[1:28:33]
poce usuly respo withi
[1:28:34]
1030 mutes t shu down the
[1:28:36]
lo music andarties onhe
[1:28:37]
dock. The sameoats will
[1:28:39]
rern t next d, andhe
[1:28:40]
noisy parti willtart it u
[1:28:42]
again. We wou sugst a
[1:28:44]
regur 10 P.M. Wk tough b
[1:28:45]
police to shut down the loud
[1:28:47]
music andisperse the cros
[1:28:50]
at t park se of theock.
[1:28:51]
The park rgers walk through
[1:28:54]
theock 2 to 3 tes to check
[1:28:56]
a d,o chefhe boats
[1:28:57]
are pingheir morage fees
[1:29:00]
for tha day Theyeave by
[1:29:02]
or 7 at nightfter the tag
[1:29:04]
chec a and give ticke.
[1:29:07]
Where where nded.O oneith
[1:29:09]
authities arodo maiain
[1:29:11]
or enforce the dockules that
[1:29:13]
clearly sta wre y can
[1:29:14]
moor your boat, where y where
[1:29:16]
you pay n excessi nse
[1:29:17]
allowed, no driing on the
[1:29:20]
dock ando rafti angside
[1:29:21]
otheroats onhe sou side
[1:29:24]
of the doc These these res
[1:29:26]
have been regarly. The
[1:29:27]
rusaveot been regarly
[1:29:29]
enforced sincehe harrmaster
[1:29:32]
potion w eliminate during
[1:29:33]
Covi andhere
[1:29:33]
s nonen
[1:29:35]
e dock with authori to end
[1:29:37]
any rul breakingctivities. A
[1:29:38]
w aercations between
[1:29:40]
Marine tenants and louoat
[1:29:41]
operator and their guests hav
[1:29:43]
already occurred this summer,
[1:29:46]
ich have iolved fistfight
[1:29:47]
verb threa, and pole
[1:29:48]
inlvement regding the
[1:29:56]
sputes. Uh. Run out of tim.
[1:29:59]
Okay. Um, tonight I wou like
[1:30:01]
to eress the Mariners
[1:30:04]
homeowne request tt tir
[1:30:05]
concns rarding the exces
[1:30:07]
noise be consided wn
[1:30:08]
planng the new doc
[1:30:10]
constrtionorext year.
[1:30:11]
This wou incde cle
[1:30:12]
undersnding o theules and
[1:30:14]
meodf enforcentor t
[1:30:15]
upming years. We are
[1:30:17]
xpaying Kirklan residen
[1:30:19]
who do not wanthe newock to
[1:30:20]
become playgund foroud
[1:30:24]
muc and ptying crown.
[1:30:26]
Examples of this activit wou
[1:30:28]
be wte to be where they had
[1:30:30]
to had t enforce new rules at
[1:30:32]
the neay as the new nrby
[1:30:34]
homeowneequested t end
[1:30:36]
this type of offensive behavr,
[1:30:38]
and Andre Bay in theouth
[1:30:39]
ke Washingto wre theyre
[1:30:40]
initiating n rules t control
[1:30:41]
e noisy cwds durin the
[1:30:44]
summerhe dk wallshould
[1:30:45]
be f boarder looking to
[1:30:46]
visit Kirklan throughhe
[1:30:48]
shops, enjoy the resurants
[1:30:49]
an bebleo sta on their
[1:30:51]
at and not be assault wit
[1:30:53]
loud mic andooxious and
[1:30:56]
noxious behavio Tnk you.
[1:31:00]
Than you Jer. Alia.
[1:31:02]
Alic Ramirez will be followed
[1:31:03]
by Aaron Bellmorend Brady
[1:31:04]
Nordstrom.
[1:31:06]
Than you.
[1:31:08]
Good eveng Couil. Thank you
[1:31:09]
for letti me speak tonight
[1:31:10]
Firstff I want to tnkou
[1:31:13]
for passi resolutn 5729
[1:31:15]
lastear related toreparing
[1:31:16]
the cy and comnity for Ice
[1:31:18]
acvity and f t progress
[1:31:19]
tords the goals ofhe
[1:31:20]
solution that werehared
[1:31:22]
during the lt meeng.
[1:31:24]
Hover, deste tsroject
[1:31:25]
progre tim is not on our
[1:31:27]
side Dinghe last seval
[1:31:28]
eks, there haveeen a
[1:31:29]
arming uptk I Ice
[1:31:31]
abductiof comnity memrs
[1:31:33]
in shorene, Seale, Rento
[1:31:35]
Burien Tukla, Redmond
[1:31:36]
Lywood and Everett just to
[1:31:39]
name a few.Esterday in Lake
[1:31:41]
rest Park, a cmunity mber
[1:31:42]
wa violent pulle o of
[1:31:44]
theirehicle aaken by ice
[1:31:45]
in bro daylight in the mide
[1:31:47]
ofhe neighrhood. Ts
[1:31:49]
incint is onlne ofany
[1:31:50]
happenin all overhe regn.
[1:31:53]
Almo every day. Irge y to
[1:31:54]
mo quily tomplement the
[1:31:58]
rest of resution 5729, and to
[1:31:59]
provide mor resrces t
[1:32:01]
resident rarding immigtion
[1:32:02]
ghtsndssistancor
[1:32:04]
impaed commuty membe who
[1:32:05]
ve los the brewinner,
[1:32:07]
breainner, or fily membe
[1:32:09]
to Ice.Hank you.
[1:32:18]
Thk you, Aon.
[1:32:20]
Ar here tod Not to attac
[1:32:21]
anybod jus tryin to get
[1:32:22]
some resution. Everythg
[1:32:24]
bad onypinion, simy
[1:32:26]
because Cit of Kirklan will
[1:32:28]
notnswer any queions and or
[1:32:30]
give any hel u just kind of
[1:32:31]
roll thrgh stuff qui. Soe
[1:32:32]
only hav three mines.His
[1:32:34]
is the originaonstruction of
[1:32:35]
one pticular dk. You can
[1:32:37]
see se supporthat was de
[1:32:38]
withonstant conete cinr
[1:32:40]
ocks.Ongineeri done.
[1:32:41]
Jeffet u kw that
[1:32:43]
engineeringt Cit Kkland is
[1:32:44]
required Helso lets know
[1:32:45]
that permits a required.
[1:32:47]
Report it. Cit ofirkland
[1:32:48]
di nothing.His ishat
[1:32:52]
happen wn nothing is done.
[1:32:54]
Read on ain. Secd te, no
[1:32:56]
permitity. City has not
[1:32:58]
do anythin Then, uh, Am
[1:32:59]
from pine comesut. I didn
[1:33:01]
e anyonstruction. Any any
[1:33:02]
idence of constction? Wl,
[1:33:02]
there
[1:33:03]
plywood There
[1:33:03]
s sti
[1:33:04]
th cinder blocks. There
[1:33:04]
s. I
[1:33:05]
mean, don
[1:33:05]
t know I that
[1:33:06]
od. It
[1:33:06]
s leading o
[1:33:07]
anning. We
[1:33:08]
ren big troub.
[1:33:11]
Uh, by the way I was told that
[1:33:13]
not contactheire departmt
[1:33:14]
for tha a, uh, I
[1:33:15]
ve bn on
[1:33:17]
ithat o civilervantsre
[1:33:18]
usinghose decks I don
[1:33:18]
t kno
[1:33:19]
theiramiliesr frien
[1:33:20]
know tt the
[1:33:20]
re inanger.
[1:33:22]
Possly ery day.Ere
[1:33:24]
one
[1:33:25]
cah basin that was replace
[1:33:27]
tiednto lar cat basin
[1:33:28]
that gs on to uer fir
[1:33:30]
laneightere. Posble
[1:33:32]
nkholes.Eave water mns
[1:33:33]
th were pced, possibl
[1:33:35]
nkholes, firefigers, pice
[1:33:38]
cruirs. Other cizens m or
[1:33:39]
y not kw aut what I can
[1:33:40]
be possiy done. Here
[1:33:40]
s here
[1:33:42]
a pket tt was given you
[1:33:44]
weret the mting MAY 1st
[1:33:45]
Why youuys refed tonswer
[1:33:47]
estions is beyde. This is
[1:33:47]
at you
[1:33:47]
you
[1:33:48]
eleed
[1:33:49]
officials. You
[1:33:49]
re here to
[1:33:50]
aner qstions. You hearhe
[1:33:51]
do stuff for the peoe.Ere
[1:33:52]
David
[1:33:53]
s pmise in an email
[1:33:53]
that I
[1:33:54]
m going t getnswers
[1:33:56]
by MAY 13th. Still kno I n
[1:34:00]
swers right the. Boom. Uh.
[1:34:02]
Consta delay He saide h
[1:34:03]
a meeti with eerts. Experts
[1:34:04]
were goi to be abl to g me
[1:34:05]
th answers after the m 13th
[1:34:08]
meetg. N ansrs after my
[1:34:09]
meing. Aft our couil
[1:34:10]
meetg thether d, I said
[1:34:12]
that I w n abl t ctact
[1:34:13]
cocil and or fire bedn
[1:34:14]
David
[1:34:14]
s eils. He
[1:34:16]
sis, uh,
[1:34:16]
he
[1:34:18]
s his retaliaon email
[1:34:19]
that states, oh,ell, youan
[1:34:21]
contt them. Iever said
[1:34:23]
at. And oh,aronefuses to
[1:34:24]
meetn pern, but Aaron
[1:34:24]
doesn
[1:34:25]
hav more emailsn
[1:34:27]
that. And then, uh, here we
[1:34:28]
have I Dav
[1:34:29]
s email right
[1:34:30]
herehere he says, don
[1:34:31]
unt, don
[1:34:32]
t conta firer
[1:34:37]
counl.M, so blameame,
[1:34:37]
we
[1:34:38]
re n goingo enter int
[1:34:39]
e blame game with David. Ah,
[1:34:41]
my attorne said,ut David
[1:34:42]
keeps doing it. Adamseeps
[1:34:44]
dog it.Avid. Did takes
[1:34:45]
snippets of emailsnd tri to
[1:34:47]
changehe outco oft.Y b
[1:34:48]
the bye.Hatre youtating?
[1:34:49]
Yo know, mor, y
[1:34:50]
re really
[1:34:51]
od at publi speaking.Our
[1:34:53]
follow through realleally
[1:34:54]
is awful. You know, you say
[1:34:55]
Kirkla
[1:34:56]
s all inclusive, you
[1:34:57]
say all this stuff, but there
[1:34:59]
no aion. So emaed the
[1:35:00]
cityouncil. I hell of y
[1:35:02]
ys reply I don
[1:35:02]
tanto
[1:35:04]
ha another psible violaon
[1:35:05]
om youuys neplying. Um,
[1:35:06]
so let
[1:35:06]
s get on tha Let
[1:35:07]
s p
[1:35:08]
th thing to a head. Let
[1:35:08]
s get
[1:35:10]
th done so all the cizens
[1:35:12]
can leafe. Civil sernts
[1:35:14]
can opeteafe. The don
[1:35:15]
ve to worry about not gng
[1:35:16]
me to their famil bause a
[1:35:18]
de cshed the This is
[1:35:19]
ridiculous. We
[1:35:20]
ee you nt
[1:35:21]
timeecause I onl g three
[1:35:21]
minutes. We
[1:35:22]
re goi to get to
[1:35:23]
know eac other real wl.
[1:35:25]
Guys
[1:35:29]
Thankou.Ll right. Nexte
[1:35:31]
have Bdy Nortrom.
[1:35:32]
D Bdy
[1:35:32]
jning us
[1:35:34]
viually.
[1:35:50]
All right. Brady are y there.
[1:35:52]
Itight te jus o momen
[1:35:55]
Ok
[1:35:58]
Hey treolks. Um I belve
[1:35:59]
youan hear me now so
[1:35:59]
ll go
[1:36:01]
for it. Um hiy nam isrady
[1:36:03]
Nordstrom and amhe
[1:36:04]
associat dector o
[1:36:06]
Govement Relatio and picy
[1:36:07]
at t Housingevelopme
[1:36:08]
Consorti. I
[1:36:08]
m also hereo
[1:36:10]
represen t vois o the
[1:36:11]
Eastide Affordable Housing
[1:36:12]
alition, which consis of
[1:36:15]
about 30rganizatnshat
[1:36:17]
bud, operate a advate for
[1:36:18]
affordab hsing on the Et
[1:36:21]
side,ncludingnirkland. I
[1:36:23]
rst wanted tohank sffor
[1:36:24]
thei hardorkndarly
[1:36:25]
engament around the housi
[1:36:27]
on faith owned Ld Ce
[1:36:28]
amendment that
[1:36:30]
s on thegenda
[1:36:32]
today.E suprt the itial
[1:36:33]
proposal frotaff andhe
[1:36:35]
proactiv eagementhat was
[1:36:36]
done wit the aordable
[1:36:37]
housg community including
[1:36:40]
, ouroalitionembers.H,
[1:36:42]
thisolicy is a w win for
[1:36:44]
faith comnities and the cy
[1:36:46]
of Kkland. Fth
[1:36:47]
ornizations can use their
[1:36:49]
land tomprove theirinancial
[1:36:51]
standing while contributin t
[1:36:52]
mission aligned commuty
[1:36:53]
goals.T
[1:36:54]
slso aood chance
[1:36:55]
for t city toxpand
[1:36:58]
affoable houng. U
[1:36:59]
wever, this policy is only
[1:37:00]
rthwhile I it can b use b
[1:37:02]
these faith comnities. U
[1:37:04]
so,h,eust wanteo thank
[1:37:06]
staff for setti a sol
[1:37:08]
foundationorhis success.
[1:37:10]
Um, som of thehings, without
[1:37:13]
goin into ahe detls, but
[1:37:14]
exible alearesign and
[1:37:16]
develoent standar,m,
[1:37:18]
crease cacity in excnge
[1:37:19]
r affordabity with the
[1:37:21]
chance to getoeeper levs
[1:37:23]
throughxtra bonus. A tn
[1:37:24]
the bight approl and
[1:37:26]
administraveeview f
[1:37:28]
departe ruests. Um,
[1:37:30]
somethg that is ptty common
[1:37:31]
in devopments tt almos
[1:37:33]
every proct requires a
[1:37:35]
departure. So weanted to
[1:37:36]
thanktaff f including
[1:37:37]
ministration departusor
[1:37:40]
these minor deviatis. Um, w
[1:37:42]
would als ask for more
[1:37:43]
substaialode deviati
[1:37:45]
requests to have a pathw as
[1:37:48]
we. Um, so faith comnities
[1:37:49]
are n development exper.
[1:37:51]
And so w suprthese
[1:37:53]
addition pts o theode
[1:37:53]
that
[1:37:54]
seing recmended, or
[1:37:56]
the tngs tha go beyd t
[1:37:58]
code, ratr including
[1:38:00]
expedited pertting,eview,
[1:38:01]
preubmittal,onferences and
[1:38:03]
staff suprt. Um, fute wor
[1:38:05]
will als be need to edute
[1:38:07]
thes faith comnities about
[1:38:09]
at thi tls, how theyan
[1:38:11]
use I and wt circutances.
[1:38:12]
Um, itltimatel takes
[1:38:15]
knowdge, money and time f a
[1:38:17]
fah community to en
[1:38:19]
nsider devopment and then
[1:38:21]
go thrgh a discernnt
[1:38:23]
ocess. So we look fwardo
[1:38:25]
is next stage asell. So,
[1:38:26]
um tnk you for yr time
[1:38:27]
this evening and tha you for
[1:38:29]
moving forward Thi important
[1:38:30]
pocy.
[1:38:34]
Thank you. Brady. All rht.
[1:38:34]
Ty clerk
[1:38:36]
Nexte hav Ax Zimmean,
[1:38:40]
Leon Stute and Lith Wkler
[1:38:43]
for, um, tirst t on se
[1:38:45]
theast virtu.
[1:38:47]
L right Alex.
[1:38:49]
S.Hank you.Ow,y name,
[1:38:50]
Al Zimmean.
[1:38:50]
Mresident
[1:38:52]
of Sai Arica. Want to
[1:38:54]
speak aut low income pblem.
[1:38:58]
Soight months ago, but I the
[1:38:59]
Balk country Hsing
[1:39:01]
thority eightonths ago, I
[1:39:05]
givey ruest a few qstions
[1:39:08]
Deputyayor.R. Black
[1:39:10]
beusee commiioner of Kin
[1:39:13]
County Housi Authoty. So
[1:39:15]
situatn ver simpl right now
[1:39:16]
la yea I com throuime
[1:39:18]
to meeting Kin Country Housing
[1:39:20]
Authorit Aft three meeting
[1:39:22]
they giv merespass forev.
[1:39:24]
Sohe rest o my lif I cant
[1:39:28]
go. S MR. Blackid thi You
[1:39:29]
kn what thi mea. Why
[1:39:30]
Beuse Iave a little b
[1:39:33]
differt opion. Maybe very
[1:39:34]
dierent onion. Bause Kin
[1:39:36]
Countrousing authori.Hat
[1:39:38]
isommissior? M black,
[1:39:39]
putyayor. It
[1:39:40]
a pure crook
[1:39:42]
d bandi and killer.Hese
[1:39:44]
e very serio problem They
[1:39:46]
re dangerous than Hitle
[1:39:49]
zi, Gtapo, fascist. You
[1:39:52]
kn what is me? W he a
[1:39:57]
constution. Law for 250 yea.
[1:39:58]
Hitler d
[1:39:59]
t have thi in
[1:40:01]
frdom ofpeech. Hitler don
[1:40:05]
have this. If we have execuve
[1:40:07]
order yeago from Trump,
[1:40:08]
you kw what has bning
[1:40:09]
cotry hounguthority
[1:40:11]
possibly belong t Amecan
[1:40:13]
tizen. Because am calm for
[1:40:14]
these tee mtings. What do
[1:40:16]
th have? Investigatihe
[1:40:18]
gu. You snt $100 mlion
[1:40:22]
for not legal immrants a
[1:40:24]
peop like me. Senr citizen,
[1:40:26]
dibled, l incom You know
[1:40:26]
what I mean? Don
[1:40:27]
t he sons.
[1:40:29]
Go to King Country Housing
[1:40:31]
Authority. You pay 3 from
[1:40:33]
income liky income,or
[1:40:35]
exame. I cannot aord to
[1:40:35]
live. It
[1:40:36]
s fine. Artment
[1:40:43]
never. L broom. Y know it
[1:40:47]
is 40 bksbove iome. So
[1:40:48]
this guy.Ery intesting.
[1:40:50]
Because you know abo thi I
[1:40:52]
speak about tsnd a
[1:40:53]
councilnow about this. And no
[1:40:55]
onenswer. Buthis.Xactly
[1:40:57]
what is you doing? Bause I
[1:40:58]
told youore dangero than
[1:41:01]
Na Gestapo fascisthis guy
[1:41:03]
who spoeforee. Talk abo
[1:41:05]
this. Ectly. Se becau y
[1:41:07]
Democrou make from King
[1:41:09]
country and fro here. You know
[1:41:10]
what It
[1:41:12]
mean? 2.5 milli
[1:41:15]
slave in this. 1illion. Is
[1:41:17]
ry quiet Nody talking
[1:41:19]
abt thiou know what that
[1:41:20]
mean So y mor dgerous
[1:41:22]
than Hitr? Naz Gesta,
[1:41:24]
scist. Gler talki about
[1:41:27]
Germ for eve Gern you
[1:41:29]
kill,very Arican citen is
[1:41:31]
totally opposite. You areeal
[1:41:34]
born, Dieter. You rl killer.
[1:41:36]
When you sp dng ts, w
[1:41:37]
low income citen America
[1:41:38]
don
[1:41:39]
t hav rig? Vivrump
[1:41:41]
Viva new Amerinevolutio
[1:41:43]
and up! Slave in happy cow.
[1:41:45]
We have ecutive order from
[1:41:53]
PRESIDENT. Did you know you
[1:42:02]
Al rightext we have Leo.
[1:42:05]
Clark.
[1:42:07]
Mayo Curtis, we hav a gst
[1:42:07]
here tt
[1:42:09]
snnouncin a ver
[1:42:10]
specl scholarship a
[1:42:10]
they
[1:42:11]
requestghat tha
[1:42:14]
gut beeard fro first. And
[1:42:17]
that persons, um,ilith,nd
[1:42:19]
shes online. Cane
[1:42:20]
accommodathat reque,
[1:42:21]
plea?
[1:42:22]
Absolute.
[1:42:38]
Stand by
[1:42:39]
Good evening City couil
[1:42:41]
membersnd Mor Curs. M
[1:42:43]
name I Lilh Winkl Sha I
[1:42:44]
seed on t Kirandouth
[1:42:47]
Cocil fm 2006 to 201 and
[1:42:48]
m very exced to be her
[1:42:50]
toy to psent the eighth
[1:42:52]
annual Matthew Doll Kirkld
[1:42:53]
Yout Council Memorl
[1:42:55]
Scholarsp Award. Mat serd
[1:42:56]
on Kkland You Counc from
[1:43:00]
2009 to 2012. He passe away I
[1:43:02]
Februa of 2019. Matt w
[1:43:04]
proudf his svice to his
[1:43:05]
counity and loved being
[1:43:07]
part of the council. I h
[1:43:09]
spirit and mory. His parents,
[1:43:11]
Linda and b, establishes
[1:43:13]
annual scholarip t benefit a
[1:43:14]
Kirkland Youth Couiligh
[1:43:15]
Scho senior. I
[1:43:16]
m here
[1:43:17]
presenting thecholarship
[1:43:18]
Reviewommittee, which
[1:43:20]
includesyself a Alyson
[1:43:21]
Blair andenny Drabble who
[1:43:23]
areheren cmber tay.He
[1:43:24]
threef us have serve on kyc
[1:43:26]
togeth alongside our dear
[1:43:28]
friend Matt. Eecially
[1:43:29]
citing.Onight
[1:43:29]
mere to
[1:43:32]
troduce Leoity to the t
[1:43:33]
the Couil a to t
[1:43:36]
mmunity a t 2026 recipnt
[1:43:37]
ofhe Matth Doll Kirand
[1:43:38]
Yout Councilemorial
[1:43:40]
Scholarspward, Leon is here
[1:43:41]
wi us tight and wl mak
[1:43:42]
some remks after this
[1:43:45]
nounceme. Leonraduated
[1:43:46]
from Juani High Schoo this
[1:43:47]
year.He will be attendi the
[1:43:49]
University of Washingn.Eon
[1:44:03]
is to be commend for her
[1:44:03]
exteiveervicend
[1:44:03]
leadersh to Kirklan on the
[1:44:03]
Yout Council beginni in
[1:44:03]
2024 We are incrediy touched
[1:44:04]
her resnses to the essays,
[1:44:04]
ande wouldove to share o
[1:44:04]
que, whiche really tnk,
[1:44:04]
, gives theeartnd sl of
[1:44:05]
what Kirklanouth Cncil is
[1:44:07]
about, and parcularly about
[1:44:07]
what Leo
[1:44:08]
s svice isbout,
[1:44:10]
she wrote. The mtaluable
[1:44:10]
skl I
[1:44:12]
ve takway fm kyc
[1:44:14]
is t abilio build bdges
[1:44:15]
betwneople a cree
[1:44:17]
aceshere others feel
[1:44:18]
nuinely seen, heard and
[1:44:20]
valued. I realid how much
[1:44:22]
belonging shapeshe wayeople
[1:44:23]
ntribute collarate, and
[1:44:26]
ow. When I becameo-chair, I
[1:44:27]
began thiing about leadership
[1:44:29]
no asirecting people, but as
[1:44:30]
intentiolly creatg
[1:44:33]
coection. Congrulations!
[1:44:35]
Leon Kirkld Yth Couil
[1:44:36]
continue t provi an
[1:44:38]
important formave oppornity
[1:44:39]
for loc youth Weant to
[1:44:41]
recogniz Reg Schweiger for
[1:44:42]
the wderfuluidance she
[1:44:43]
coinues torovide ashe
[1:44:44]
program crdinator for the
[1:44:46]
Kirkland You Council and
[1:44:47]
thank youor the opptunity
[1:44:48]
toake this solarship
[1:44:50]
nouncement. And now,
[1:44:51]
believe Leon wouldike t use
[1:44:52]
herublic cment to say a few
[1:44:54]
rds. Tnkou a souch
[1:44:55]
an congratations again.
[1:45:05]
Thanou.
[1:45:07]
Good eveng, Mayorurtis.
[1:45:09]
Member of the City Counc and
[1:45:11]
everyo her tonight. First, I
[1:45:13]
woul reay like to sincerely
[1:45:15]
thank t Dellamily and t
[1:45:17]
holarshi cmittee, for this
[1:45:20]
inedible honor. Um, feel so
[1:45:23]
genuinel honed. Um, it
[1:45:25]
reallyeans so much to reive
[1:45:27]
a scharship that celrates
[1:45:28]
Mahewell
[1:45:28]
comtment to
[1:45:30]
servg our comnity. And I
[1:45:32]
also wt to tha theity of
[1:45:34]
Kilandorontinuing t
[1:45:36]
investn young pple through
[1:45:38]
progra like tirkland
[1:45:41]
Youth Cncil and t excerpt
[1:45:42]
at was shared ofy
[1:45:44]
scholahip essay I talke
[1:45:46]
abou buildgridges beten
[1:45:49]
people and creing, u spaces
[1:45:51]
whe other feeleen, heard
[1:45:54]
an valued. That becam truly
[1:45:57]
biggestakeaway from kyc
[1:45:58]
but it also chang theay
[1:46:02]
that I think aut leadersp.
[1:46:04]
When I fst joine kyc, I
[1:46:06]
though I was joini a gup
[1:46:08]
thatlannedventsnd
[1:46:10]
voluntred in t communi.
[1:46:12]
Whehat is still tru I
[1:46:14]
verxpected it t spe that
[1:46:17]
ki of person that wanted to
[1:46:20]
become I taught me that
[1:46:21]
meaningful leadershi isn
[1:46:23]
aboutavinghe loustoice
[1:46:23]
in the room. It
[1:46:24]
s about makg
[1:46:26]
surehat people feel
[1:46:29]
comfortae using theirs. And
[1:46:30]
some o the momts I
[1:46:30]
m most
[1:46:32]
proudfhen I was the one
[1:46:34]
speaking. But whe I saw
[1:46:38]
meone who had once been qui
[1:46:40]
begin sharing their ideas
[1:46:41]
because the finly ft lik
[1:46:44]
they bonged. Asomeoneho
[1:46:46]
has moved between countries,
[1:46:48]
cuures and cmunities man
[1:46:51]
tis, I kw how mningful
[1:46:53]
at flingf belongian
[1:46:55]
be. That
[1:46:56]
s why creating spaces
[1:46:57]
whe peopl fl welcomed,
[1:46:59]
cluded and valued is
[1:47:01]
someing ce so deepl
[1:47:01]
abt. And it
[1:47:03]
something um,
[1:47:03]
andt
[1:47:04]
s a lesson
[1:47:04]
llarry
[1:47:06]
wi me longfter my te on
[1:47:10]
ky. Reiving a scholaripn
[1:47:10]
Matthew Dell
[1:47:11]
same is
[1:47:12]
especially meaniful becau
[1:47:14]
it reminds m tt t bridges
[1:47:17]
we bld and the, u impacts
[1:47:20]
we mak c can, can connue
[1:47:20]
longfter w
[1:47:22]
reone. Every
[1:47:23]
act of kiness, eve
[1:47:24]
opportity w creat f
[1:47:26]
someone else a everyerson
[1:47:28]
we eourage has t potenal
[1:47:29]
to sha theommunity inays
[1:47:31]
we MAY nev fly see. And
[1:47:32]
ho to carry tha lessonith
[1:47:36]
me lgfter m te on kyc is
[1:47:39]
over. So thank you again t the
[1:47:40]
doll family, thecholarsh
[1:47:41]
mmittee, andhe City of
[1:47:43]
Kirknd for thi incredie
[1:47:45]
honor.T is sometng that
[1:47:47]
will alwaye gratefu for and
[1:47:48]
will carry with meherever
[1:47:51]
fe takes me next. Thank you.
[1:47:52]
Thank you liane and
[1:47:53]
congralations. Ias going to
[1:47:55]
say weould clap, b y
[1:47:55]
can
[1:47:57]
t hear us. S thank y so
[1:47:59]
ch. A rig.Ext we have
[1:48:01]
Aaron.
[1:48:03]
Aaron Hilton, follod by
[1:48:05]
Aliciauiznd Sn
[1:48:07]
Hornibrook
[1:48:10]
Thank you.
[1:48:11]
Hello aga. It
[1:48:12]
s wonderf
[1:48:13]
seeing all o your virtual
[1:48:14]
fas. It
[1:48:15]
s been a hot minut
[1:48:18]
Um,ut I alws like toake
[1:48:19]
anfforto rognizeeople
[1:48:21]
that go above a beyd,
[1:48:24]
especialhent comes ty
[1:48:26]
counity. U even thoh I
[1:48:28]
little bit late, Redmond
[1:48:30]
keeps m bus Um, but I would
[1:48:32]
like t recogze Cef Saint
[1:48:33]
Jean andhe Kirkld Pice
[1:48:35]
Dertment for dng just tha
[1:48:37]
and inving m t present my
[1:48:39]
transgder commuty
[1:48:41]
teraction and engement for
[1:48:43]
public safet traing coue.
[1:48:43]
It
[1:48:44]
s a mouthfu It
[1:48:45]
a wor in
[1:48:47]
progress. Huhh, bk I
[1:48:48]
JUNE. It
[1:48:49]
s not sething that
[1:48:52]
Mi nded t do or hado d
[1:48:54]
bu aer my quicknd dirty
[1:48:57]
pitch and conrsation, u
[1:48:58]
he was o board. H wanteo
[1:48:59]
do it. Signed u Let
[1:49:02]
s g Um,
[1:49:04]
atruly means aot. It was
[1:49:06]
areatrainingession. Um,
[1:49:08]
the offers in attdance
[1:49:09]
passed wit flyg colors.
[1:49:11]
A-plus. Gol sta. Uh, they
[1:49:14]
asdremendou questns. U
[1:49:17]
andt gives m hope to see l
[1:49:20]
enfoement taking these
[1:49:23]
oppounitieso lrn abo my
[1:49:25]
community a what ty can do
[1:49:27]
toelp. And, uh, I don
[1:49:28]
t kw
[1:49:29]
ofny of y remember, buthe
[1:49:34]
last te Ias over the, um,
[1:49:35]
ving the sech on Trans
[1:49:37]
Vibility Day, I ske lot
[1:49:39]
abt kwledges per And,
[1:49:42]
um, this is wre it kind of
[1:49:43]
arts.Hisraining progr
[1:49:44]
that
[1:49:45]
ve bee working on wh
[1:49:46]
puic safety is to help bridg
[1:49:49]
th gap, um, and rebui tse
[1:49:51]
brges beten law enforceme
[1:49:54]
an m communi. A we
[1:49:54]
re
[1:49:55]
startingnd I
[1:49:56]
m actlly
[1:49:59]
startingo see proess, um,
[1:50:01]
especially wit interacons
[1:50:02]
from law enforcementith the
[1:50:04]
communy. U so it
[1:50:05]
s it
[1:50:06]
giving meope tha w
[1:50:07]
re wt
[1:50:10]
m doing I good. I hope, um,
[1:50:13]
and that we c connueo
[1:50:16]
reild tha tst. Um, I like
[1:50:19]
thank Mikeery much
[1:50:21]
because,ou know, with our
[1:50:23]
convertions, you
[1:50:23]
ve always
[1:50:25]
been. Jt wan t just
[1:50:27]
want to do wha I need to do to
[1:50:30]
ma you all hpy and feel
[1:50:32]
sa and important And that
[1:50:34]
really means lot. Um,o I
[1:50:36]
ju wanted to recogni those
[1:50:39]
efrts and appciate what the
[1:50:40]
Kirkndd is doing And
[1:50:42]
hofullyean teou all
[1:50:44]
can take tha to we
[1:50:44]
re all
[1:50:46]
coming in SEPTEMBER. S
[1:50:47]
hopellyou
[1:50:48]
a lite b
[1:50:50]
mo prepare for, uh, deang
[1:50:52]
th the comnity from afar or
[1:50:54]
wever they want te doi
[1:50:57]
at. So thank youery muc
[1:50:59]
Thk you Aon.E sincerely
[1:51:00]
appriate y showing your
[1:51:02]
appriation. So tha y very
[1:51:05]
much. Um, Acia
[1:51:06]
next.
[1:51:08]
Correct?
[1:51:10]
Rrect. She is online, so
[1:51:10]
we
[1:51:11]
re waitingor her to go
[1:51:13]
throughhe transion here.
[1:51:22]
Okay.
[1:51:24]
Good eveni, Mor Ctis a
[1:51:24]
members.
[1:51:25]
Of theouncil.Y name is
[1:51:26]
icia Ruiz, a I
[1:51:27]
m here today
[1:51:28]
on behalf of habitat for
[1:51:30]
hunity, Sttleing and
[1:51:32]
Kittas cnties to speak I
[1:51:33]
suppt o therdinance
[1:51:34]
exnding affordabl housing
[1:51:36]
opportities o faith oed
[1:51:38]
propty. Habat
[1:51:38]
ission is
[1:51:40]
simp.Verybody deserve a
[1:51:42]
dent,ffordabl pla to
[1:51:44]
call home. W work towd tt
[1:51:45]
mission throughermanent
[1:51:47]
affoable homeownship and
[1:51:48]
partnersps that turn
[1:51:50]
unrused land into rea
[1:51:52]
housg opptunity. This
[1:51:53]
ordinance speak dirtly t
[1:51:56]
that wor.Aith oppornities
[1:51:58]
ross t Eastse oft hol
[1:51:59]
la tha is increbly
[1:52:01]
vaable a underused. Tse
[1:52:02]
parcel repsentnef the
[1:52:04]
most promisind mos
[1:52:05]
overloed opptunities to
[1:52:07]
buil afforble homes in
[1:52:08]
places tha alrdy have
[1:52:09]
communit roots
[1:52:11]
Trant access andeighbors
[1:52:13]
who wano see the thre by
[1:52:15]
allong streamledermitting
[1:52:16]
andeasonablensity and
[1:52:18]
height flexility f
[1:52:19]
resideial devopment on
[1:52:21]
faith own ld. This
[1:52:22]
ordinance removes real
[1:52:24]
barrie, the kinds that often
[1:52:26]
the kin tt oft stall
[1:52:27]
affordle projects for yea
[1:52:30]
ill them befe they. It
[1:52:31]
ves fth organations a
[1:52:33]
genuine path t put their land
[1:52:34]
toward lon term comnity
[1:52:36]
benefi and it gesonprofit
[1:52:37]
velopersike hitat a
[1:52:40]
able partn to build wit
[1:52:41]
We kw tsodel wks, a
[1:52:42]
it
[1:52:43]
s alrea helngamilies
[1:52:44]
move froenting to oingn
[1:52:46]
communies across ouregion,
[1:52:48]
and we believet can wk in
[1:52:51]
workn Kirkld t.Abitat
[1:52:52]
isommitted to deepening our
[1:52:54]
esence on the eas se. We
[1:52:55]
nt toork directly wit
[1:52:55]
rkland
[1:52:57]
fth communies,
[1:52:59]
ci sffnd this cncilo
[1:53:01]
identi sites where this
[1:53:03]
ornance can turn into real,
[1:53:05]
peanently affordaeomes
[1:53:06]
forocalamilies. W see thi
[1:53:08]
legislatn as an invation,
[1:53:10]
and we intdo ansr it. W
[1:53:11]
urge y toass this
[1:53:12]
ornance, ande lookorward
[1:53:14]
buildin what comes next
[1:53:15]
gether.
[1:53:16]
Thk you.
[1:53:25]
Than you. Alici.
[1:53:29]
An Horbrook virtuallyfter
[1:53:30]
Shn, w have t additnal
[1:53:33]
gues.En Menzie,n site
[1:53:34]
an Joe Kinsler virtual.
[1:53:56]
Thk you
[1:54:13]
an, d you hrs?
[1:54:14]
N you hear me?Kay.
[1:54:15]
We can g
[1:54:16]
ead.
[1:54:19]
Grt. Thank you so much. Gd
[1:54:22]
eveninissayor. And to
[1:54:23]
council. I
[1:54:24]
ll be rllyrief
[1:54:26]
here. Only my onlyomment.
[1:54:30]
Haso do with the Arrieta,
[1:54:33]
uh, agreeme. Um,nd I wanted
[1:54:33]
to just. I
[1:54:35]
se the memrs
[1:54:37]
of theouncil and MADAM Mor
[1:54:38]
are familiar with what
[1:54:38]
s wt
[1:54:40]
the agrment is about. Uh,
[1:54:41]
one, I
[1:54:42]
s aordable housi,
[1:54:44]
whic is gat. U and think
[1:54:46]
we can all get behind that. But
[1:54:47]
myoncern with thisew
[1:54:51]
agreent is that in 2019,m,
[1:54:54]
uh Arethaenefited from the,
[1:54:59]
uh,he mft,m, pil pgram.
[1:55:00]
Theylready gotte a tax
[1:55:02]
benefit, receive aax benefit
[1:55:04]
r this propey. Same
[1:55:06]
footint. So what are what are
[1:55:08]
at are w going to get wit
[1:55:10]
anothe tax break. Plu the the
[1:55:12]
no intert loans memrs of
[1:55:13]
the Kklandommunity,
[1:55:13]
ve
[1:55:16]
livedere for heowner for 2
[1:55:18]
years n. Great. Gat pla.
[1:55:20]
, and s w c allgree on
[1:55:22]
that a I jt wted t know
[1:55:22]
at we
[1:55:23]
re goi toet f
[1:55:24]
nefit, because w
[1:55:24]
re going to
[1:55:28]
be takg gen, uh, tm a t
[1:55:32]
break thah, has ttill be
[1:55:35]
pang the, the, t, the
[1:55:38]
ountf money duehat I has
[1:55:40]
toe assesd. It
[1:55:41]
s going t
[1:55:45]
ve to come from somewhe. So
[1:55:45]
what
[1:55:46]
s the benefit going t be.
[1:55:46]
Becae that
[1:55:47]
s als money
[1:55:47]
that
[1:55:48]
sot goi to go to other
[1:55:50]
places to dferent proams
[1:55:52]
forffordabl houng. So when
[1:55:54]
I looke at this agreement I
[1:55:55]
noted tt we
[1:55:55]
reot the
[1:55:56]
re
[1:55:56]
not getng we
[1:55:57]
re not getting
[1:55:58]
any n units tha are
[1:56:02]
affordle. Als, t the
[1:56:04]
rticular propey,m, is
[1:56:07]
inherely, uh, ineensive.
[1:56:13]
And, um,ell bel t uh,
[1:56:16]
60%edian teshold of, u
[1:56:19]
artment rent rental. So w
[1:56:19]
re
[1:56:20]
loing at t benefitecause
[1:56:20]
we
[1:56:21]
re payg more. And they
[1:56:22]
alrey had aenefit.O
[1:56:22]
they
[1:56:23]
re back aga for secon
[1:56:25]
befit. So what are weoing
[1:56:28]
to g? No more new units. So
[1:56:30]
ybe a guarant that that
[1:56:30]
it
[1:56:32]
going to sta low. Well,
[1:56:33]
the
[1:56:33]
s nothing tt
[1:56:33]
s bn
[1:56:35]
presend that I c see tha
[1:56:37]
going to cause these mro
[1:56:40]
artments,h, micro studios
[1:56:44]
to increas asar ashe size
[1:56:45]
d theirootprint. We
[1:56:45]
re not
[1:56:46]
gettg any me uni.Hat
[1:56:47]
no going t chae if it
[1:56:48]
switched to aew buyer,
[1:56:49]
they
[1:56:50]
ve gothe same footprint.
[1:56:53]
So if theyant to refbish it
[1:56:53]
or whaver,hey
[1:56:54]
going t
[1:56:55]
ve to expd an inordine
[1:56:57]
amountf money to make ts a
[1:56:59]
different rentalalue
[1:57:00]
propty. So i
[1:57:02]
m askg a
[1:57:03]
urging the nooteecause I
[1:57:03]
don
[1:57:05]
t see a benef or new
[1:57:06]
fordable housing with this
[1:57:07]
rticular agreement. I thank
[1:57:08]
you allor yr time this
[1:57:09]
eving.
[1:57:14]
Thank you. Sea.
[1:57:15]
Yes. Thank you. I
[1:57:15]
m sor. That
[1:57:16]
wast.
[1:57:17]
L right I thoht youere
[1:57:24]
done.Hank you so mh.
[1:57:26]
Thankou.
[1:57:27]
An. Done. Oy.
[1:57:27]
So I
[1:57:28]
mereo talk about the
[1:57:31]
tw library.M, and the rfp
[1:57:35]
respon. Um,o it
[1:57:35]
s submitt
[1:57:37]
by theastside Tl
[1:57:40]
Colltive,hich h no form
[1:57:42]
rightow. Undhey say
[1:57:42]
they
[1:57:44]
reoing to operate under
[1:57:45]
fiscal spoorship of the South
[1:57:48]
ng Tool Library. So wt
[1:57:50]
diggin into the irs databas
[1:57:51]
an found the South King Tool
[1:57:52]
Library. Tyaven
[1:57:54]
t submied
[1:57:56]
theirax retur for twoears,
[1:57:57]
sohey
[1:57:58]
re rig on t verge
[1:57:59]
of losg their tax exempt
[1:58:01]
stus. And yethe city I
[1:58:03]
anticipang that w wouldo
[1:58:05]
business with them as tax
[1:58:08]
exempt oanization. T r
[1:58:09]
reonse doe not include any
[1:58:11]
response a descripon of
[1:58:13]
wh fisca spoorship means.
[1:58:15]
Fial sponsorip is eremely
[1:58:18]
brd a veryomplex.
[1:58:20]
Metimes the fiscal sponsor
[1:58:21]
ts on behal o the
[1:58:23]
organition, andometimes
[1:58:24]
they actlongside. Won
[1:58:26]
ow, and yet we
[1:58:27]
re going to be
[1:58:29]
asked as a cy to make out a
[1:58:31]
check f $100,000 to
[1:58:33]
esumably, Sou Kin Tool
[1:58:34]
Library. And weave ndea
[1:58:36]
what the relatiohip betwe
[1:58:41]
them ahe, u the Eastse
[1:58:45]
Tool Clective is. Soe
[1:58:45]
re if
[1:58:46]
we d
[1:58:48]
tive t mon to the
[1:58:49]
ol lrary,he Sth Kin
[1:58:50]
Toolibrary, tn somebody
[1:58:52]
goingo have toay tesn
[1:58:52]
it.Nd that
[1:58:53]
s n I the
[1:58:56]
buet. S w need tonow wt
[1:58:58]
legal eityhe cits going
[1:59:00]
be working with. Otherwise,
[1:59:01]
the r I kin of
[1:59:03]
n-responsive We just don
[1:59:11]
kn.O what?Hy is this rfp
[1:59:13]
reonse so empty and crical
[1:59:15]
financl areas Why isn
[1:59:20]
ybodyiving it a once ove?
[1:59:25]
Is the rfp jt a forlity?
[1:59:26]
Oh well,e
[1:59:27]
re all frien,
[1:59:27]
and it
[1:59:29]
s only $10000, s we
[1:59:29]
real don
[1:59:30]
taveo be vy
[1:59:31]
reful about it, becse we
[1:59:32]
ll
[1:59:34]
sortll thi out Well,
[1:59:34]
don
[1:59:35]
t think so. I thi
[1:59:38]
$100,000s a lotf mey, and
[1:59:41]
I thinkhat befee process
[1:59:43]
thisfp, before we haveny
[1:59:44]
ki of agreent, we hav to
[1:59:46]
ki of get out of thisne
[1:59:47]
ha, washi the oth
[1:59:49]
relationip a itead create
[1:59:49]
arm
[1:59:50]
sength relatnship
[1:59:53]
between theity and our
[1:59:56]
ntractor so that we g our
[1:59:56]
ney
[1:59:57]
s worth and we know who
[1:59:58]
we
[1:59:59]
re working wit andhat
[2:00:00]
we
[2:00:02]
re going to get for what w
[2:00:04]
spend. Tha y.
[2:00:07]
Thkou.Ll rig, Joe
[2:00:16]
counlor
[2:00:18]
Can everyon hr m y.
[2:00:20]
Than. Hopefully this tng
[2:00:22]
work Um.Ew kind ofew
[2:00:25]
technolo. New neworm of
[2:00:26]
zoom. So I
[2:00:27]
monna get through
[2:00:28]
th as quick as I canith t
[2:00:31]
mites. 50s. Um, really wou
[2:00:33]
encoage the city of Kirklan
[2:00:33]
to Look, I
[2:00:34]
ve asked you to d
[2:00:35]
is befor I askou to do it
[2:00:37]
again. Consiring t remarks
[2:00:39]
of a certain Ale And none of
[2:00:40]
you fel lik you cou sak
[2:00:41]
upnd say tha was wro.Nd
[2:00:43]
historallyntrue, amo
[2:00:46]
otrhings,hat youeed to
[2:00:48]
allyalk to yrriends in
[2:00:49]
Reond, and y need to tal
[2:00:50]
to your fends in Blevue
[2:00:51]
about getng se cncil
[2:00:53]
rules,ecause y
[2:00:53]
re spending
[2:00:55]
a nightwayrom yramilies
[2:00:56]
here You don
[2:00:56]
deserve toe
[2:00:58]
comparo ms murderi
[2:00:59]
nocidal monster I
[2:00:59]
m not
[2:01:00]
even going to use the words
[2:01:02]
mmerman used. Inow better.
[2:01:05]
Um,nd I find thoseind of
[2:01:06]
quificatio unfair to you
[2:01:08]
an your frids andamily.
[2:01:11]
, find them unfai to the
[2:01:12]
staff and the comnity to he
[2:01:15]
to sit through this. Um, this
[2:01:16]
is not why fough for public
[2:01:17]
comment s har duringnd
[2:01:20]
shortly after the pandemic. Um,
[2:01:23]
is I uh, not okay.He way
[2:01:23]
you
[2:01:24]
re bng treed. And
[2:01:25]
thk it
[2:01:26]
sncumbentpon you
[2:01:27]
stand uporach oth and
[2:01:28]
push the bouaries here.
[2:01:30]
Dmondid.T looks le
[2:01:30]
Zimmerma
[2:01:31]
s intimidat fm
[2:01:33]
goinghere.Ercer Islandid.
[2:01:34]
Zierman doesn
[2:01:34]
go there
[2:01:38]
ymore. Ueattle really has
[2:01:39]
it.Immerman dsn
[2:01:39]
gohere
[2:01:42]
anyme. Kin o see a patte.
[2:01:42]
I tnk I
[2:01:43]
ve made m poi.
[2:01:43]
It
[2:01:44]
s kind o running a bit
[2:01:45]
te. While wish you a wel
[2:01:46]
and beafeut the, make
[2:01:50]
su all youo.
[2:01:52]
Thank you. All right. City
[2:01:54]
clk.Oes that e our publi
[2:01:55]
coents?
[2:01:57]
S, it does.
[2:02:00]
L rig. Tha y. We are
[2:02:02]
now movin on t theonsent
[2:02:04]
lendar. Beforee have a
[2:02:05]
motion, I liko ask the
[2:02:07]
Depu mayor to present the
[2:02:10]
dit of account.
[2:02:11]
Thankou mayorhank y.
[2:02:13]
Mayor. Wereow movg. Oh,
[2:02:15]
sorry. U I always, u rea
[2:02:16]
from t wrong section there.
[2:02:18]
Thank y. U w h payroll
[2:02:19]
in themount o
[2:02:24]
$10,2,835.26, a billsnd
[2:02:28]
amount of $12,9,410 and
[2:02:30]
.94.
[2:02:31]
Ank you.
[2:02:32]
Is tre aotion topprove
[2:02:35]
th consent caldar?
[2:02:36]
Moved.
[2:02:38]
Oh, wow. I think thatas
[2:02:40]
Counciember Pm. Sond by
[2:02:41]
counl. Deputy MAY. Is tt
[2:02:45]
right Couilmemberrim, wer
[2:02:48]
u the mion maker Okay. All
[2:02:48]
right. It
[2:02:49]
s bee moved b
[2:02:50]
Cocilmemberim, sond by
[2:02:52]
Dety Mor Black toove
[2:02:54]
forwar Thionsent caldar.
[2:02:57]
Is there a dcussion? A
[2:02:59]
ose I favor,lease say aye.
[2:03:01]
Aye
[2:03:04]
Any opped? Mion carries
[2:03:08]
ven zero. Thank you. All
[2:03:10]
right. We are now movin on to
[2:03:12]
r regular busines agenda.
[2:03:14]
Ou first im o busines is
[2:03:16]
on altnative delivery ofhe
[2:03:18]
ter Peter Kirk Poole, project
[2:03:31]
cityanager.Ou are muted
[2:03:32]
That was a brilliapening
[2:03:33]
too. And I
[2:03:34]
veust spped all
[2:03:36]
ov it. Tnk y MADAM. U
[2:03:38]
so ts I yourecond
[2:03:39]
presentaon onhe alternave
[2:03:41]
of the Per Quill Project As
[2:03:42]
you know, you ges
[2:03:43]
rmission to go t the state
[2:03:44]
seef theyouldpprove
[2:03:46]
e project. Theyid? Can I
[2:03:48]
hear abo tha And the it
[2:03:49]
requires under our code, the
[2:03:51]
cityouncil to give staff
[2:03:52]
permissi to proce wit this
[2:03:54]
asn altertive delivy
[2:03:55]
meth. So we
[2:03:55]
going to he
[2:03:56]
a council preseation tonig.
[2:03:58]
And w areooking for a motn
[2:04:00]
approve us to mov fward.
[2:04:01]
, her to giveou that
[2:04:02]
prestations ourenior
[2:04:04]
project engineer,nika Davis
[2:04:05]
our consultants at Turne and
[2:04:07]
Townsend, Hry aurulie
[2:04:08]
Unrwood, o director of
[2:04:14]
public works.
[2:04:22]
Ankou. Cyanager. Good
[2:04:23]
ening, Mam Mayor. Deputy
[2:04:25]
yor, black andity council
[2:04:26]
ank youor this opportuty
[2:04:27]
to provide an update on t
[2:04:31]
ter Creool project. Um,
[2:04:37]
we can move to the nex slide.
[2:04:39]
As the city manager summarid
[2:04:41]
in Je,ouncil received an
[2:04:43]
erview of therogressi
[2:04:45]
design bld andupported
[2:04:45]
staff
[2:04:47]
s recomndation to apply
[2:04:47]
to thetate
[2:04:48]
s Pject Revw
[2:04:50]
Committee, p, for
[2:04:52]
authorizion to usehis
[2:04:53]
delivery mhod. Uh, tonht
[2:04:54]
we
[2:04:55]
ll brief rap the Peter
[2:04:57]
Creekool project and w
[2:04:58]
staf continue to recomme
[2:05:00]
prressive dign build. Um,
[2:05:00]
then we
[2:05:02]
smarize the prc
[2:05:04]
decion, explain how this
[2:05:05]
devery metho protect plic
[2:05:07]
value. Wk thrgh thelanned
[2:05:08]
schedu and procurent
[2:05:10]
procs a conclud with
[2:05:12]
recoendedouncil actions for
[2:05:14]
night and inhe future for
[2:05:17]
this proje. It sounds like a
[2:05:17]
t, but it
[2:05:19]
s only ten sdes
[2:05:19]
and we
[2:05:23]
re alrea two dow. So.
[2:05:25]
Light.
[2:05:27]
, pject summary the Per
[2:05:29]
Kirkod projects pmarily a
[2:05:30]
renovati proct. T
[2:05:32]
existi facility haseached a
[2:05:33]
point wre iestment is
[2:05:35]
need to addressging
[2:05:37]
building syste.He pool
[2:05:39]
shl, the and dk, mechacal
[2:05:40]
an electril syste.
[2:05:42]
Acssibility impromentsnd
[2:05:44]
renotions to theathhouse
[2:05:45]
Uh With thi the pject
[2:05:47]
proves an opportuty to
[2:05:47]
prove the communi
[2:05:49]
exrience by replacihe
[2:05:50]
existing wadg pool with a
[2:05:52]
more funionalctivity pool
[2:05:54]
and expding the bhhouse t
[2:05:57]
incle family and all genr
[2:05:59]
angingooms. Her preous
[2:06:00]
council decions. The sco
[2:06:02]
will n inclu rocating t
[2:06:03]
pool entrae t Kirkld
[2:06:05]
Avenue and expration o the
[2:06:10]
pool andlosure. Um, as sho
[2:06:13]
on ts slide. Ohou can.
[2:06:15]
Thereou go. Thanks. U t
[2:06:16]
prect is suppoed throu a
[2:06:18]
coination o impact fee
[2:06:20]
ITne, Kirklanarks and
[2:06:21]
Ki County Parks levies a
[2:06:23]
grt. Pottial debtunding,
[2:06:25]
debtinancing and total
[2:06:27]
entified fundiackage of
[2:06:30]
approximatel 11. Mlion. Uh,
[2:06:31]
th complexity of delering
[2:06:32]
this wkithin an exiing
[2:06:34]
opering aquatic facily a
[2:06:35]
codinating all o these
[2:06:37]
terconneed stems,ed t
[2:06:38]
affo recmend progrsive
[2:06:40]
design bld, u proessive
[2:06:42]
degn build I wel stedor
[2:06:43]
projec thatnvolve thnical
[2:06:46]
complety, unown existg
[2:06:48]
conditions and chaenging
[2:06:50]
schedules.Hose arexactly
[2:06:51]
the cracteriscsf our
[2:06:54]
Peterirk Poo pject. The
[2:06:55]
project inclus speciized
[2:06:57]
aquac mechanical stems
[2:06:59]
integring and intrating new
[2:07:01]
stems wh exiing
[2:07:02]
inastructureates
[2:07:04]
uncertntieshat are best
[2:07:05]
resolv when t conactor
[2:07:07]
can joi t team ely, rathe
[2:07:09]
thanfter the desig is
[2:07:11]
mplete. At the same time, the
[2:07:13]
projec must balance immiate
[2:07:14]
frastructure needshile
[2:07:15]
intaining ssonal
[2:07:17]
operatns. Ultately,
[2:07:19]
progresse design bld alls
[2:07:22]
the owner digner,ontractor
[2:07:24]
an contractor t collabote
[2:07:26]
early to refincope,
[2:07:27]
imove,onstruct ality,
[2:07:29]
manage risk and devop
[2:07:31]
realisc cost information
[2:07:32]
before cstruction is
[2:07:34]
contraed. Those advanges
[2:07:36]
are not availle through a
[2:07:38]
tradional design biduild
[2:07:49]
apprch. As we summarize
[2:07:51]
earlie folwing council
[2:07:52]
diction, sta prepared and
[2:07:53]
submitd theity
[2:07:56]
applicatn to the prc on Jun
[2:07:58]
30th. Tpplication was
[2:08:00]
accepted without any request
[2:08:01]
for claficationr addional
[2:08:02]
information, and sff
[2:08:04]
prented the project to the
[2:08:07]
committee o Jul 24th. The
[2:08:08]
ci
[2:08:09]
sresentationeam
[2:08:10]
includedublic Wksirector
[2:08:12]
Jue Undwood, deput
[2:08:13]
direct of pks Joh Lloyd,
[2:08:15]
Parks pnning and developme
[2:08:17]
manage Mariah Gill, a
[2:08:18]
myself. We were supported by
[2:08:20]
Turn andownsend Harris
[2:08:21]
seing as our owner advis,
[2:08:22]
and Pacifaaw Group serving
[2:08:25]
egal counsel After o
[2:08:27]
presention, questns and
[2:08:29]
discuson, the comttee.He
[2:08:30]
coittee unanimous
[2:08:31]
dermined tha the project
[2:08:33]
satisfie the statury
[2:08:36]
requiremts of rcw 3910nd
[2:08:36]
approv the cit
[2:08:37]
s request to
[2:08:39]
e progressi desig build.
[2:08:41]
The committee provid pitive
[2:08:42]
feedback about theity
[2:08:44]
preparedsso ainisterr
[2:08:45]
progresse desn, build
[2:08:46]
project. Ty comnded the
[2:08:49]
traini cpleted by sta.
[2:08:50]
Ouse of an expienced
[2:08:51]
owner, advor a leg
[2:08:53]
counsel,ndurfforts to
[2:08:54]
buil relatiohips witeer
[2:08:56]
agencies experieed in
[2:08:58]
ogressive dign, build and
[2:09:01]
aqtic facities Ovell,
[2:09:02]
th committ describ the
[2:09:03]
ty as well prepare said this
[2:09:05]
s a good use ofubliconey
[2:09:07]
and comment tha wead
[2:09:08]
pick the rightroject for
[2:09:12]
progressiv dign, build a
[2:09:15]
acy wil take t nextlide.
[2:09:16]
Thks.,
[2:09:17]
Annika.
[2:09:19]
Sorogressive designuild.
[2:09:23]
Protects thealue of public
[2:09:24]
dolls.
[2:09:27]
In coue of way So bes
[2:09:28]
lue selection. Thi giv us
[2:09:30]
thepportunity toelect a
[2:09:32]
team tt I mostuality or
[2:09:33]
no best val. Qualificaons
[2:09:36]
sed, best val selection So
[2:09:37]
itivess the oortunity to
[2:09:38]
sect a tea that isost
[2:09:40]
quifiedo diver t
[2:09:42]
prect. Bh, both technically
[2:09:44]
an from a pcess persptive.
[2:09:46]
And thatlso include u
[2:09:48]
specialty subcoractors and
[2:09:49]
su consultts. S tha
[2:09:51]
especial applicaeo ts
[2:09:53]
project with the poo uh
[2:09:55]
systems. Those are vy speci
[2:09:56]
in nate.Nd we
[2:09:57]
ll takehe
[2:09:59]
right tm, u to deliverhe
[2:10:01]
oject. Wel um,t
[2:10:02]
s also
[2:10:04]
basednransparent costs So
[2:10:05]
we
[2:10:06]
lltart worng wit the
[2:10:08]
team ely oo devel
[2:10:10]
exactlhat thecopes of
[2:10:11]
theroject and whathe cts
[2:10:12]
e of the pject. A I
[2:10:13]
developen what
[2:10:13]
s cald an
[2:10:15]
en bk, um, nure. And
[2:10:15]
th
[2:10:19]
s contractual Um, so
[2:10:20]
erything tha the contractor
[2:10:22]
am isorking on early onn
[2:10:24]
the proce ishared withhe
[2:10:26]
owner team transpantly. S
[2:10:28]
the the sub numbehat ty
[2:10:29]
e gettirom potenal
[2:10:31]
rtners, they
[2:10:32]
re back u to
[2:10:34]
all of their infortion. All
[2:10:35]
of the dails arehere. So we
[2:10:37]
a tea can evaluat I and
[2:10:38]
undetand ifhat
[2:10:38]
s goodalue
[2:10:40]
to the proje. And we c als
[2:10:42]
e, u thi party estimators
[2:10:43]
to reviewhat a hp us
[2:10:45]
undetand tt as well. A
[2:10:48]
then u mket competion. So
[2:10:50]
the design builders selected
[2:10:53]
bad onualification t
[2:10:55]
subs can beelectedn
[2:10:57]
qualifations or through
[2:10:59]
competive subntractor
[2:11:00]
biing. So we get to have some
[2:11:01]
flexility in howhey
[2:11:05]
brout on. B there is um,
[2:11:06]
ere will be some uh,
[2:11:09]
compitive bidackages. And
[2:11:09]
so we know that we
[2:11:09]
getting
[2:11:11]
e best val there. Um,his
[2:11:13]
is als the delivery method
[2:11:14]
that gives us t best
[2:11:17]
opportunitie to iorporate
[2:11:18]
business. Um, andhat
[2:11:19]
s by
[2:11:21]
being able tm, createhe
[2:11:22]
right pkages and make sur
[2:11:23]
that we hav them and also t,
[2:11:26]
e contrting is open. So
[2:11:26]
we
[2:11:27]
able to selthem I
[2:11:33]
this pross. Ming t my next
[2:11:35]
slide. Sohis I big kind of
[2:11:38]
overchingimelinef the
[2:11:38]
project and wtt
[2:11:39]
sntending
[2:11:42]
to show he tays, uh,
[2:11:44]
contract milesnes. And when
[2:11:44]
we
[2:11:46]
ll ce backo see you. So
[2:11:49]
e block are milesnes that
[2:11:51]
reprent eitr the fir one,
[2:11:55]
um, procurent. Uh, and and
[2:11:59]
contct phase So we signne
[2:12:00]
contct androgressiveesign
[2:12:02]
build at theeryeginning.
[2:12:04]
D it is f an initial pha
[2:12:06]
service And then therere
[2:12:07]
endments tha g with tha
[2:12:09]
So the next time weouldome
[2:12:11]
backo see you as we
[2:12:11]
ve got
[2:12:13]
ourots thatepresent couil
[2:12:16]
visits, um, wld beround
[2:12:17]
Dember. S asoon ase get
[2:12:18]
doneith prorement a I
[2:12:18]
ll
[2:12:19]
ta a little b more about
[2:12:20]
th process onhe next sde.
[2:12:23]
And that wld be for the to
[2:12:24]
apove award of the contrt
[2:12:25]
fo thenitial phase of
[2:12:26]
serves, which is called
[2:12:28]
validationnd w anticipe
[2:12:31]
th to be 2 to 3 month And
[2:12:34]
th we wou come back again
[2:12:37]
for, u of t nexontract
[2:12:39]
ase, whichill likely
[2:12:40]
incle the early work packa
[2:12:41]
thate
[2:12:41]
ve tald aut bng
[2:12:43]
ableo do somef t thing
[2:12:43]
at needo be done onhe
[2:12:45]
poolrior to openg forext
[2:12:47]
season, along wit t balance
[2:12:50]
of desn forhe pject, and
[2:12:52]
th toward the e of desn,
[2:12:53]
we ce back wit what
[2:12:53]
s cled
[2:12:55]
the g andment, and tts
[2:12:57]
the andment thatnables
[2:13:05]
cotruction.M,f we
[2:13:05]
re
[2:13:06]
successful her tonig and
[2:13:06]
you
[2:13:08]
re compell by o reque
[2:13:09]
to use progressive design
[2:13:10]
build, t next step would be
[2:13:12]
to mov into, uh, procument
[2:13:13]
of t project and so on. A
[2:13:15]
progresse dign build
[2:13:17]
project.Hat that mns is
[2:13:17]
it
[2:13:18]
s a two step, two step
[2:13:21]
qualificions base, uh,
[2:13:23]
selectio Fir steeing
[2:13:24]
issuin a reqst for
[2:13:26]
qualificatio.N respons to
[2:13:27]
that,e wld recei
[2:13:28]
statemts ofualificaons
[2:13:30]
frroposed desig build
[2:13:31]
teams. Anye who
[2:13:31]
intested
[2:13:33]
can submit stement of
[2:13:35]
quifications selecon
[2:13:36]
commite riews those
[2:13:38]
qualicationso eablish a
[2:13:41]
shorist. The srtlisthen
[2:13:43]
receives the rfp for the
[2:13:46]
prect. Reque f prosals.
[2:13:48]
Inhat phase theeam is
[2:13:49]
deveping managent plan
[2:13:50]
where the
[2:13:51]
re tling the three
[2:13:52]
teams w are shortlied,
[2:13:54]
typilly three, uh,
[2:13:56]
manament plan tha tal
[2:13:57]
abou how theyould approh
[2:13:59]
devering the proje for the
[2:14:01]
city. Ando, uuring tt
[2:14:03]
riod, ste five there, we
[2:14:05]
woul hold int intertive
[2:14:06]
etings. And these arenique
[2:14:08]
to proessive desn build
[2:14:09]
sortf simar to an
[2:14:10]
inrview. The
[2:14:11]
reustetp
[2:14:12]
a lite bit difrent. And
[2:14:12]
at
[2:14:13]
s wt makeshem uniqu
[2:14:14]
and proessive design bui.
[2:14:16]
D we recve thoseanagemen
[2:14:18]
plans after those interacve
[2:14:20]
meetgs evaluatnommittee
[2:14:23]
then evaluat the second step
[2:14:25]
magementlans, score all
[2:14:28]
tother,nd the yave a,
[2:14:30]
, apparent, uh, higcoring
[2:14:31]
propos that y
[2:14:31]
d go into
[2:14:34]
coract negotiatis with, uh,
[2:14:37]
ce westablish conact
[2:14:39]
terms. Tha was tha would b
[2:14:39]
when we
[2:14:40]
d comeack f tt
[2:14:49]
initial contrt approl.
[2:14:51]
Becae excusee? Becse the
[2:14:53]
city has not yet eablished a
[2:14:54]
stanrdrocess f counc
[2:14:55]
ersight of progrsive
[2:14:58]
design build procts. Sff
[2:14:59]
prosing a seriesf
[2:15:01]
decisi points that we belie
[2:15:03]
llrovide meaningful cncil
[2:15:05]
ovsight throughouhe
[2:15:06]
project, beginng tight with
[2:15:08]
authoration to procure a
[2:15:10]
ogressive desig build tea
[2:15:12]
After tonht, t next
[2:15:13]
recommend actn would be the
[2:15:15]
proval o a of t desn
[2:15:17]
build conact. Folwinghe
[2:15:18]
lection of t Progressi
[2:15:20]
Design blder,hich ishe
[2:15:21]
process Sta just outned in
[2:15:23]
the last sli.His is
[2:15:25]
currtly anticipated in
[2:15:27]
Deceerf thi yr or I
[2:15:29]
JANUARY. U athat mting,
[2:15:30]
would sumrizehe
[2:15:31]
procurent proce, present
[2:15:33]
evaluati rults, a ruest
[2:15:35]
authization t execu the
[2:15:38]
ntract. After tha staff
[2:15:39]
anticipas completg the
[2:15:40]
validaon phase which
[2:15:41]
confms that the proje
[2:15:43]
scope, budge andchedule
[2:15:44]
remainligned befe movin
[2:15:46]
into fullesign. Sta wou
[2:15:48]
en retur t counc, which
[2:15:51]
wenticipatg I Mar with
[2:15:53]
confirmaon of that alignnt
[2:15:55]
and reqst to proceed with
[2:15:58]
full design devopment. Um and
[2:16:00]
priminary dign concept for
[2:16:03]
the rlacementctivity poo
[2:16:04]
we antipate bringg to y
[2:16:05]
that te, andhen
[2:16:07]
auorization toroceed wit
[2:16:09]
any recommeed ely work
[2:16:10]
packes, whi woulde wor
[2:16:13]
befo we ope um, in the
[2:16:17]
summer seaso for 2027. Um,
[2:16:18]
finay,efore major
[2:16:19]
nstruction begins, council
[2:16:21]
woulde askedo appro t
[2:16:23]
negotiated,h, guanteed
[2:16:25]
ximum pce gmp for the full
[2:16:27]
project. At tha time, we
[2:16:29]
esent the resul of any
[2:16:31]
dependenost validion and
[2:16:33]
nfirm thathe propod price
[2:16:34]
isairnd reanable bore
[2:16:35]
requesting authozation to
[2:16:38]
oceed with conruction. As
[2:16:38]
we
[2:16:39]
veiscussed the ctract
[2:16:41]
amendmts are aormal and
[2:16:42]
expected partf pgressive
[2:16:44]
designuild. As theroject
[2:16:46]
vancesrom desig ultately
[2:16:48]
constction, the contrac
[2:16:50]
is ientional amended to
[2:16:51]
authorize eac n pse of
[2:16:54]
wo.Hese planned mestones
[2:16:55]
in the divery pross shod
[2:16:56]
not be intpreted ahange
[2:17:04]
orders Son theext slide
[2:17:04]
Sooday
[2:17:05]
s recmendation for
[2:17:07]
for this ening, staff
[2:17:08]
recoends that council
[2:17:09]
authoriz staff t proce with
[2:17:11]
ocuremen of o a proessive
[2:17:13]
desi buildeam for the Peter
[2:17:15]
Kirkool project and dirt
[2:17:16]
aff to return to counc f
[2:17:19]
apoval of theontract.
[2:17:19]
Appral of tight
[2:17:20]
s motio
[2:17:21]
alwshe staff t begin t
[2:17:22]
compitive prorement
[2:17:25]
process,nd we will return at
[2:17:26]
each majorilestone that we
[2:17:27]
ve
[2:17:29]
ju outline Um, a that
[2:17:30]
conclusy preseation.
[2:17:31]
Thank you forourime and
[2:17:32]
consideratn, and we
[2:17:32]
d be
[2:17:34]
happ to awer any qstions
[2:17:35]
that y MAY have.
[2:17:38]
Thk you Aika. Stacy. Uh,
[2:17:39]
uncil, any questio?
[2:17:55]
Mments? Deputy mayor. You
[2:17:55]
re.
[2:17:57]
Thereou go.
[2:17:58]
Ank you, Mam Mayor. Uh, I
[2:18:00]
there we no questions I w
[2:18:01]
going to get u srted wh a
[2:18:02]
moti.
[2:18:03]
That sousine.
[2:18:04]
Lks lik Couilmember
[2:18:06]
Falcon ds have questn f
[2:18:06]
staff.
[2:18:07]
Okay.
[2:18:08]
Counlmember Fcon, go.
[2:18:10]
Ahea
[2:18:12]
Um, thank you, MADAM Mayor.M,
[2:18:14]
I just wanted t menti,m,
[2:18:15]
thank you for,m, I don
[2:18:17]
remember who mentied, but
[2:18:18]
ntioned the.
[2:18:19]
Um.
[2:18:20]
Theudos tha we g in
[2:18:21]
tablishing network of peer
[2:18:23]
encies. And I jus wanted to
[2:18:25]
call out and thank Ryan Bkf
[2:18:26]
the Lak Washiton Sool
[2:18:28]
Distri, in particur, for
[2:18:29]
th workn tha because
[2:18:29]
that
[2:18:30]
s sometng that I know
[2:18:30]
we
[2:18:31]
learned lot fro tir
[2:18:34]
expertis Um, and we reay
[2:18:35]
value our ptnership with t
[2:18:36]
scol distrt, that
[2:18:37]
s a.
[2:18:38]
Thankou.
[2:18:40]
Thank youeputy Mor. Bk
[2:18:41]
to you.
[2:18:44]
Well, thank y.M, so I
[2:18:44]
ll
[2:18:45]
make t motio I move to
[2:18:47]
authorize and direc theity
[2:18:48]
nager oresigneeoroceed
[2:18:50]
with therogressi desn
[2:18:51]
ild procument pcessor
[2:18:53]
th Peterirk Pooroject and
[2:18:55]
turn t cncil for appval
[2:18:56]
the conact wh the
[2:18:58]
seleed pgressiveesign
[2:18:59]
builr.
[2:19:01]
Send.
[2:19:03]
Has been moved by Deputy Mor
[2:19:04]
ack.Econd by Councilmemb
[2:19:06]
lcon to move forwa wh the
[2:19:08]
progssiveesign,uild any
[2:19:13]
furtheriscussio. All rht.
[2:19:14]
Well, I justant to tha
[2:19:16]
evybody for the good work.
[2:19:17]
And I
[2:19:19]
m eited to sta this
[2:19:21]
project. So all those inavor
[2:19:22]
and theotion o the table,
[2:19:24]
please say I.
[2:19:25]
I.
[2:19:28]
Anypposed motion cares
[2:19:35]
seve zo. All rht.E are
[2:19:36]
movin to o nt item
[2:19:38]
which is t dra tool library
[2:19:40]
imementation pn. Cy
[2:19:42]
mager.
[2:19:44]
Okay. Thankou mad Mayor.
[2:19:47]
Um, she goalonight is to
[2:19:49]
prent you with the draft
[2:19:51]
reonse tohe rfp we had,
[2:19:52]
ich thetaff dee as being
[2:19:54]
araftmplemention plan for
[2:19:55]
thewo libra. Lookior
[2:19:56]
counci directi on wheth
[2:19:58]
you wouldike uso proce
[2:19:59]
wi discuionsith t
[2:20:01]
proposer or if there
[2:20:01]
s a
[2:20:02]
her infmation tha you have
[2:20:04]
that you nd itead. So to
[2:20:06]
give thatresentatn is
[2:20:07]
automac. Campbell, o
[2:20:09]
vernmentffairs manager
[2:20:10]
Thank you Cityanager. Goo
[2:20:12]
evening, Madamayor.
[2:20:13]
Deputyayor andembers of t
[2:20:15]
uncil. Hpy to be he
[2:20:16]
toght to prode an uate o
[2:20:18]
the dra ilementation plan.
[2:20:20]
I hav nelideseginning
[2:20:23]
with a brief overvie of the
[2:20:25]
prect background. We
[2:20:25]
ll then
[2:20:27]
go over few key pieces of the
[2:20:29]
submitte propol, and we
[2:20:29]
ll
[2:20:30]
conclude with aandful of
[2:20:32]
poli questions tha a als
[2:20:34]
tlined inour memorandum.
[2:20:36]
D while my psentatios
[2:20:37]
lesshan tlides, the
[2:20:39]
quit a bit of info. So pase
[2:20:40]
feel fre to raise you virtual
[2:20:42]
hand or yreal hand. Ian
[2:20:45]
se allfou, so Iill pause
[2:20:46]
to answenyuestions that
[2:20:48]
come up por t t fin
[2:20:52]
policy qstions sde.Kay,
[2:20:53]
begiingith a little
[2:20:54]
baground, Counc had
[2:20:56]
expresse interest inxploring
[2:20:57]
aommunity opeted tl
[2:20:59]
librarn yrsast and
[2:21:01]
includedbjectives I bh t
[2:21:02]
Comprehensiv Plan and
[2:21:04]
stainabilitytrategic Pla
[2:21:06]
retedo circular economi.
[2:21:08]
Access to handnd electri
[2:21:09]
tools, and rse of buildin
[2:21:12]
material Staff met wit the
[2:21:13]
operators of the Seatt a
[2:21:14]
Shorele Tool librari to
[2:21:16]
tter understd wha I takes
[2:21:17]
to lauh and susin a
[2:21:19]
successfulool lrary, and
[2:21:20]
based onhose conveations,
[2:21:22]
excuse me, a conversions.
[2:21:23]
Affstimated appromately
[2:21:25]
$100,000 wld be needed for
[2:21:27]
startu which couil tn
[2:21:29]
appropried inhe 252 bget
[2:21:31]
with a conditi tt an
[2:21:33]
implemtationlan be appved
[2:21:35]
before any fdsere released.
[2:21:37]
Wh tha I Mar, staff
[2:21:39]
hostedn iormation shang
[2:21:41]
intere gheringvent
[2:21:42]
featurg Seattle Enomy
[2:21:44]
ecutive direcro introce
[2:21:47]
eonceptndiscusshat I
[2:21:48]
takes to opera a succeful
[2:21:51]
tool libra,nd recnizing
[2:21:52]
that voluntes are esstial
[2:21:53]
to a succeful too lrary
[2:21:54]
staf inved reprentatives
[2:21:56]
from community organizatns,
[2:21:58]
vonteer gros, edutional
[2:22:00]
institutns, environmeal
[2:22:01]
organizationusiness
[2:22:04]
organization totalf 1
[2:22:06]
dividual were inved a 19
[2:22:08]
ople attended. S inay,
[2:22:09]
staff ce to council wh a
[2:22:11]
draf sco o wk a
[2:22:12]
incorpored couil
[2:22:14]
dictionnto I and issued
[2:22:16]
the r Shortlyfter. We
[2:22:18]
ceived one prosal, a the
[2:22:19]
ci managerentioned from the
[2:22:21]
Eastsi Tl Colctive, and
[2:22:23]
while t rfp was ope sta
[2:22:24]
took the oortunity to gathe
[2:22:26]
adtional communi inp at
[2:22:28]
th Recycle Write event wre
[2:22:30]
70% ofesponden indicated
[2:22:32]
they wou be somhat or ver
[2:22:34]
likely to use a too lrary.
[2:22:35]
T a big cavea Younow, we
[2:22:36]
cognize thi isn
[2:22:36]
t a
[2:22:37]
statistilly rresentative
[2:22:39]
survey,ut it does provide
[2:22:40]
other indicat tha there is
[2:22:43]
mmunity intert. Respondts
[2:22:44]
also identied locatn and
[2:22:46]
the variety of tools as thewo
[2:22:50]
mostmportantonsideration.
[2:22:51]
Thgh befor disssing t
[2:22:53]
proposal itself, I want to
[2:22:55]
monstrateowtaff has
[2:22:56]
incorporated theirection
[2:22:57]
Counlrovided on MAY 5th
[2:22:59]
into t scope of work that w
[2:23:01]
included I the r. S
[2:23:03]
startingthe top fstas
[2:23:04]
liabity insuran. Staff
[2:23:06]
worked close with the City
[2:23:06]
Atrney
[2:23:08]
s officnd the
[2:23:08]
Waingtonity
[2:23:09]
insuran
[2:23:10]
authorit whichs t city
[2:23:12]
insurance autrity,o ensure
[2:23:14]
the iurance requiments
[2:23:15]
inuded in thefp
[2:23:16]
appropriatel proct the
[2:23:18]
Ci.
[2:23:20]
Second, prefence for non
[2:23:22]
ci owned lociontaff
[2:23:24]
resed the evaluation critea
[2:23:25]
to giv prefenceoroposals
[2:23:27]
recommending non city oed
[2:23:29]
locati. Wle theroposal we
[2:23:31]
reived olines both a city
[2:23:33]
owned aon city owned
[2:23:35]
option, tha pference was
[2:23:38]
sected in t solicitatn.
[2:23:39]
Third is lited city
[2:23:41]
invoement. The draftcope of
[2:23:42]
rkirstrought to Counc
[2:23:44]
had greater level ofngoing
[2:23:45]
staff involvement and sta
[2:23:47]
visedhat toarrow city
[2:23:48]
aff involmento inial
[2:23:49]
volunteer recrument and
[2:23:51]
marketinn city social med,
[2:23:53]
with ongoing responsibily for
[2:23:54]
operatio remning wh the
[2:23:57]
operator. Fourth was limitg
[2:23:57]
e city
[2:23:57]
fincial
[2:23:59]
commitmenttaff I not
[2:24:00]
proposing any fundi beyond
[2:24:02]
the 100,0 already
[2:24:03]
appropried byouncil and
[2:24:04]
any fure speing wld
[2:24:08]
requeeparateouncil aion
[2:24:09]
An finally, council directed
[2:24:10]
stf toevelop a
[2:24:12]
imementati plan bore
[2:24:13]
releing100,000.Nd tt
[2:24:14]
the ppose of tonight
[2:24:16]
diussion. If council aees,
[2:24:18]
thisroposalrovides a
[2:24:19]
suffient frameworktaff
[2:24:20]
would uset as the bis for
[2:24:22]
gotiating a finalgreement,
[2:24:24]
which wld return to cncil
[2:24:25]
r approl beforny funds
[2:24:27]
areeleased. The with
[2:24:28]
cocil
[2:24:28]
s dection, we
[2:24:29]
corporated that feedbk into
[2:24:31]
the scopef wk, issue the
[2:24:34]
rf and reaed out toll 123
[2:24:35]
indivials who had been
[2:24:37]
invid to that earli
[2:24:38]
inrmation sharingnd
[2:24:39]
interest gatherivent toet
[2:24:43]
them kw. Okay, Iant to
[2:24:44]
pauseere. Arehere any
[2:24:45]
questions befe I jum io
[2:24:50]
e propol tha was receive?
[2:24:52]
Sorry, Cncil. Any questns
[2:24:57]
onrocess?
[2:24:58]
Drea go aad.
[2:25:01]
Thankou. All right. So as you
[2:25:02]
ntioned,heityeceived
[2:25:03]
oneroposal from theastside
[2:25:05]
Toolollectiv Sta believe
[2:25:06]
it is rponsive and meets the
[2:25:08]
requirents of the council
[2:25:11]
proved sco of wor, etc..
[2:25:12]
Eastside Too Colleive is a
[2:25:14]
coalitio of Kirand resents
[2:25:15]
wh intend t for a Washingn
[2:25:17]
nonprofit, and until tha
[2:25:18]
nonprofits ford, would
[2:25:19]
erate und t fiscal
[2:25:20]
spsorshipf the South King
[2:25:23]
County Tool Libry. Ts
[2:25:24]
propalaintains tha the
[2:25:25]
city wld not own or operate
[2:25:27]
the tl libry,nd stes
[2:25:27]
that theity
[2:25:28]
sole would be
[2:25:29]
limite to pviding o time
[2:25:31]
artupunding, assting wit
[2:25:32]
idtifying locatio
[2:25:34]
pporting itial volteer
[2:25:35]
recruitmennd helping
[2:25:37]
prome the proam.
[2:25:38]
Sponsibity for
[2:25:39]
plementation oration,
[2:25:41]
affing, pgramming, a lg
[2:25:42]
terminancialustainabity
[2:25:47]
would remnith the operato.
[2:25:49]
Ok, t prosal represents
[2:25:51]
tw possible facilyptions
[2:25:52]
charactezed as trackinnd
[2:25:54]
track b. Tra a would utilize
[2:25:56]
a poron of the Fir logistics
[2:25:58]
builng and track is a
[2:26:00]
containezed mel wit the
[2:26:01]
location still t be
[2:26:03]
termined. A ts poi,
[2:26:04]
stf has not cometed due
[2:26:06]
diligenc oither oion, as
[2:26:08]
aftmplementatio pla was
[2:26:09]
requested by council bore
[2:26:10]
ciding whether or not to
[2:26:11]
preed, b staff is
[2:26:12]
commendinghatfouncil
[2:26:14]
elects toontinue forward into
[2:26:16]
gotiations, that both track
[2:26:18]
main under conderation
[2:26:19]
because additiol due
[2:26:20]
ligences neededefore we
[2:26:21]
canecommend one or the
[2:26:29]
other.He proposal includes
[2:26:31]
many many of the operatial
[2:26:32]
details outlid in the rfp
[2:26:34]
inuding a membership model,
[2:26:36]
borrowing policies, and an
[2:26:37]
online resvation and
[2:26:44]
inventor system And as
[2:26:45]
prevusly mention, staff
[2:26:47]
rked wit Wciand the Cy
[2:26:47]
Attorn
[2:26:49]
s office to ensurehe
[2:26:50]
insurancequirements were
[2:26:51]
appropriat including naming
[2:26:52]
the cit as an addional
[2:26:54]
insure and providi pro o
[2:26:55]
surance witn ten days of
[2:26:57]
coract exetion. The
[2:26:59]
propos ao include borrowe
[2:27:01]
agements, liabityaivers,
[2:27:02]
fety trainin for higrisk
[2:27:03]
eqpment, and routine
[2:27:05]
spectionnd mntenance
[2:27:10]
procedures. The city
[2:27:11]
finaial commitment remains
[2:27:12]
lited t the orinal
[2:27:15]
$100,0 approprtion. Any
[2:27:15]
additialunding wou
[2:27:17]
require fute counc
[2:27:18]
approv. Lon term
[2:27:20]
sustainabity would be the
[2:27:20]
operator
[2:27:21]
s responsibity
[2:27:22]
throug membersps,rants,
[2:27:25]
donations, worhops, and other
[2:27:27]
revenue sources thatheyeem
[2:27:32]
appropate. That is the extt
[2:27:34]
of the bkground and update to
[2:27:35]
Cociln t dft
[2:27:37]
plementation plaonight
[2:27:37]
we
[2:27:38]
re lkingor Cncil
[2:27:39]
directnn theseolicy
[2:27:41]
estions. MADAM Mayor
[2:27:43]
ke tournto y for
[2:27:44]
scussion Beginni whhe
[2:27:48]
first bullet.
[2:27:50]
Than y. Adria. So Couil,
[2:27:51]
e firstullets dshe
[2:27:53]
proposalrovide enoh
[2:27:54]
inrmation a a draft
[2:27:56]
implementati plan to srt
[2:27:58]
negoating an aeement?Nd
[2:27:59]
not, wha scific
[2:28:15]
informatn d you nee
[2:28:18]
Counl Member Arnold.
[2:28:20]
Uh,hank you, mayor.H, I
[2:28:22]
just wted to comment. I d
[2:28:25]
haveny informaon that, um,
[2:28:26]
i need here. I reallid
[2:28:27]
appriate the aunt of
[2:28:30]
rearch I dail in the
[2:28:31]
stside Tool Colctive
[2:28:34]
proposal. Um, including the
[2:28:34]
work tt they
[2:28:35]
ve de t lrn
[2:28:37]
from a crdinate with
[2:28:39]
existi too libries. The
[2:28:39]
fa tha they
[2:28:40]
re mating a
[2:28:43]
lotf thi will allow f
[2:28:46]
economies ofcale.Nd, u
[2:28:49]
both for how they crdinate a
[2:28:50]
Kirkndool library with
[2:28:53]
the other or perhaps expand,
[2:28:54]
um, toughout the Etide.
[2:28:57]
So I was impssed and, u
[2:28:59]
believe tthis draft and
[2:29:01]
implentation pn provis a
[2:29:03]
levelf detai Uh, I was
[2:29:05]
loing for it. Thank you.
[2:29:06]
Grt.
[2:29:07]
Than you.
[2:29:09]
Counciember Pascal. I had you
[2:29:13]
xt. Didou lower you hand?
[2:29:14]
Yes, tha
[2:29:14]
s a yes.
[2:29:17]
Cocilmembe Primm yea I
[2:29:18]
st want.
[2:29:19]
To s, u also, jus
[2:29:20]
Thank you to.
[2:29:22]
The tea that iniated ts
[2:29:24]
initiave. U I thi, and
[2:29:27]
for wking so hdn trying
[2:29:28]
to get a too library into our
[2:29:31]
communy, I thinkhe etc
[2:29:32]
oposal actlly h aot of
[2:29:34]
really gdnformation and
[2:29:37]
details. Um, and so, I
[2:29:38]
hostly, I hestly don
[2:29:39]
think Ieed a me
[2:29:41]
informatn. I thi, I think
[2:29:43]
e etc.Roposal isufficien
[2:29:47]
to beginegotiatis.M,nd
[2:29:48]
Ihink negotiatis at this
[2:29:50]
ste wil reall pvide and
[2:29:53]
refine a lot of theetails,
[2:29:54]
identify any risks, a reall
[2:29:56]
ensure that the cit interests
[2:29:59]
ar fly protect, includi,
[2:30:00]
um, becse Iust wto
[2:30:02]
commt onhis. The por
[2:30:04]
comment tt w made about the
[2:30:06]
South, uh, King Poo Libry as
[2:30:09]
an approiate fisca spoor.
[2:30:10]
I think aart of the
[2:30:12]
contcting pcess, tnk
[2:30:13]
that thohingsill be
[2:30:16]
aluated. Um, but yh, I
[2:30:17]
thin ahis point, just
[2:30:19]
getting t negottions
[2:30:21]
started I theppropria nt
[2:30:22]
st.
[2:30:24]
Eat. Thank you. Councilmber
[2:30:29]
Pascal
[2:30:32]
Than you,ayor. Um, are we
[2:30:34]
are w votin on athing
[2:30:35]
tonit then, or aree jt
[2:30:36]
offeri comnts and
[2:30:38]
direction?
[2:30:40]
If cncilanted t decid
[2:30:42]
betwee track a orrack b, we
[2:30:44]
would requehat tha ione
[2:30:46]
throh motion. But oer tha
[2:30:46]
that, w
[2:30:47]
re n requeing a
[2:30:48]
vote.
[2:30:50]
Ok. Wl,m,
[2:30:51]
rry.
[2:30:52]
Sorry t interrupt. I do think
[2:30:54]
you wldant a mion
[2:30:55]
auorizing staff toroceed
[2:30:58]
th negotiatis.
[2:30:58]
Thank you
[2:30:59]
Whether o not you
[2:30:59]
re cosing
[2:31:01]
e optionsr not.
[2:31:02]
No.
[2:31:04]
Sorr cit mager, you raised
[2:31:04]
ur hand. I
[2:31:05]
ll. I
[2:31:05]
ll try t do
[2:31:06]
that nt.
[2:31:08]
Time.
[2:31:10]
So,ouncilmeer Pcal, w
[2:31:11]
will b decing wther to
[2:31:14]
move forward with negotiation
[2:31:15]
Yeah s maybe i
[2:31:16]
ll just say m
[2:31:17]
comments for theiscussion on
[2:31:19]
that. You know, onc we he
[2:31:20]
tion there.
[2:31:21]
Ay.
[2:31:22]
Al right Cityanager, g
[2:31:24]
Ahd.
[2:31:26]
And I justuess I jus wt
[2:31:27]
to folw up wit that to say
[2:31:28]
that and t intents toring
[2:31:30]
a final deal bac for council
[2:31:32]
review. Sermissio to
[2:31:33]
procee tod iot still
[2:31:34]
saying yes to the fal
[2:31:36]
pruct.
[2:31:37]
Yeah.Hank you f tt
[2:31:39]
arificatn. Um, anyore
[2:31:42]
coents o informaon needed
[2:31:43]
for t draft implentation
[2:31:47]
plan Councilmemb Falcon?
[2:31:48]
Thkou, MADAM Mayor I was
[2:31:50]
just raising myand because I
[2:31:51]
was rea to move on to the
[2:31:53]
next question. If we were.
[2:31:54]
It lks lik everybo else
[2:31:56]
is.O go ahead.
[2:31:58]
Greahank you. Um, well,
[2:32:00]
rst, I agr with my cncil
[2:32:02]
collgues commes.Hank you
[2:32:04]
to staffhat hav been working
[2:32:06]
on this t commuty memrs
[2:32:08]
who have eressed just so muc
[2:32:11]
intestn inhisrojectnd
[2:32:12]
also t the East Side Tool
[2:32:13]
Collecti. Inowt took a
[2:32:14]
lo of work, a Ilso agr,
[2:32:15]
in rponse to the fst
[2:32:17]
queson, thathereas a l
[2:32:18]
of reall detaile iormation
[2:32:19]
You c tell they did their
[2:32:21]
howork. Um, and obvusly
[2:32:21]
we
[2:32:22]
ll makeure as a city that
[2:32:23]
we d ourue diligce t make
[2:32:25]
su every t is crossnd I
[2:32:27]
dott to make surehat this
[2:32:29]
is a scessful facily. You
[2:32:31]
kn, um, rding the memo, it
[2:32:33]
was really clearo mehat
[2:32:36]
beeen track a, um,
[2:32:39]
track a see t be the clear
[2:32:40]
choice to pceedith because
[2:32:42]
s, u it rults in a
[2:32:44]
beer facily, a bter
[2:32:45]
qualit fility fhe
[2:32:46]
community, a I
[2:32:47]
s less
[2:32:49]
initialetup ct. Right And
[2:32:51]
so to me, thateems a car
[2:32:53]
opon.M, a so I
[2:32:54]
eadyo
[2:32:56]
make a motionhenever you
[2:32:56]
re
[2:32:57]
ready, Mam Mayor, b,m,
[2:32:59]
alsoappy t wait if you wt
[2:33:00]
more discussnefore motio
[2:33:05]
the table.
[2:33:07]
Puty or Councmemberrnold.
[2:33:10]
Yeah, just, uh, discussn on
[2:33:12]
th parcular im. Really
[2:33:16]
appreciate the, um, desiption
[2:33:17]
in the implemention pla of
[2:33:19]
th advtages of usi the
[2:33:21]
fire stati.Hiss a
[2:33:23]
facility right nowurrently
[2:33:24]
that
[2:33:25]
s sply bei udor
[2:33:29]
storage. Um, and I, um,
[2:33:33]
suppt, um,xamininghether
[2:33:35]
itould be ud on a tempory
[2:33:38]
basis for the to libra. Um,
[2:33:42]
andut, u want mor staff
[2:33:44]
put on the impactsf that
[2:33:48]
d, uh, iormation on how
[2:33:50]
long that temporary coulde
[2:33:51]
gin the city
[2:33:52]
s medium and
[2:33:54]
long term plaorhis
[2:33:56]
particul buildin s you
[2:33:57]
know I
[2:33:58]
d le to I see the
[2:34:01]
value in keeping both tcks in
[2:34:03]
considation. Uh, but uess
[2:34:07]
aff, um, uh,omes up with
[2:34:10]
more infortion, com u wit
[2:34:12]
addition informatihat
[2:34:17]
says tre I u a better use
[2:34:18]
or an immedia need for fire
[2:34:21]
ation 27. U I really like
[2:34:23]
e ideafsing that on a
[2:34:25]
temporyasis inhe next,
[2:34:28]
um, couple o years.
[2:34:30]
Thank you Thank you,eputy
[2:34:31]
mayor. Bore cal on you
[2:34:32]
m goingo let city manag
[2:34:33]
spond.
[2:34:37]
Reed.
[2:34:38]
So t only thing I wanted to
[2:34:39]
d is par o the rean that
[2:34:42]
stf, u particurly t
[2:34:43]
ci managerecommended
[2:34:45]
eping bh tcks going is,
[2:34:46]
as I mentied, we hen
[2:34:46]
done
[2:34:47]
a t of dueiligence Tre
[2:34:50]
is capacyntation 2nd
[2:34:51]
theres som eiting
[2:34:54]
oppounities too-locate But
[2:34:54]
we hen
[2:34:55]
explored. For
[2:34:55]
ample, I
[2:34:56]
ll jus make up two
[2:34:58]
exampl thatay o MAY n b
[2:35:00]
the ce If t city h a
[2:35:02]
coitionhat the Etside Toe
[2:35:04]
collectiveeltas too
[2:35:06]
restricte,e mht wan to
[2:35:06]
ma sure we havehe
[2:35:07]
oprtunity to look at anoer
[2:35:08]
opon. So, forxample, if
[2:35:10]
theyaide nd a minimum
[2:35:12]
ve yearommitmen for the
[2:35:13]
ation, which they hen
[2:35:15]
said, and we said sorry, we can
[2:35:15]
only give you a two year
[2:35:17]
commitment Weust wt som
[2:35:19]
ability to say ihis I
[2:35:20]
e rightlace or if sometng
[2:35:21]
new delops, and w need to
[2:35:23]
give y 30ays nice to get
[2:35:23]
out, and they
[2:35:24]
re going to s,
[2:35:25]
that
[2:35:26]
s not sficient Notice
[2:35:27]
we haven
[2:35:27]
t h a chae to
[2:35:29]
reallyit dow and expre all
[2:35:31]
ose issues y. A so I is
[2:35:32]
high likel reachn
[2:35:33]
agreemen o station 27. B
[2:35:34]
the are ctainly som
[2:35:35]
ssibilities I can eision
[2:35:37]
wheheirxpectatis for
[2:35:39]
the site and o expections
[2:35:40]
y not quite align. Ande
[2:35:41]
might wt tnow that we
[2:35:41]
ve
[2:35:43]
been eloring other at t
[2:35:43]
me time. So that
[2:35:44]
the onl
[2:35:45]
ason the staffasroposed
[2:35:52]
to have thewo tcks.
[2:35:57]
Puty mayor.
[2:35:58]
Thank you.Ayor. Um, I
[2:35:58]
m n
[2:35:59]
gog to a anything to what?
[2:36:02]
Um, city managerust sd, b
[2:36:05]
doant t Plusne.H,
[2:36:08]
Council mber, Arnold, tt I
[2:36:10]
thk traighte the
[2:36:12]
rit direction to go. But
[2:36:14]
bere I mehat fal
[2:36:15]
cision, I defitely wan as
[2:36:16]
much informaon a Iossibly
[2:36:18]
can fro sta. So it sound
[2:36:19]
like City Managers prepad
[2:36:21]
to provide u tha as part of
[2:36:23]
next stepsnd andhe
[2:36:25]
negotiatn, uh, there isne
[2:36:28]
more blet point which is,
[2:36:29]
um,s there athing else
[2:36:31]
council wants t seen t
[2:36:31]
reement? I
[2:36:32]
s n so much
[2:36:33]
at I wt to seen the
[2:36:36]
agreent, but you know,, I
[2:36:39]
did wt to I, I assume thas
[2:36:42]
partf any ts, uh
[2:36:43]
procding tohe next sp and
[2:36:45]
furtheregotiatis, you kno
[2:36:48]
staffs gng toe looki at
[2:36:50]
proof of incporation,roof
[2:36:54]
of structu and ownership. And
[2:36:57]
50 c three statu Um,
[2:36:59]
insurae, certifica of
[2:37:02]
insunce,aming Kirklds
[2:37:03]
additional shared. Allf tho
[2:37:06]
ingsre um, I assumnd I
[2:37:07]
gues this is the qstion for
[2:37:10]
stf. I aumereart of
[2:37:11]
this nt step, ptf tse
[2:37:13]
discussions, this negottion.
[2:37:14]
And befe there
[2:37:14]
s ainal
[2:37:17]
agreemen all o theseoxes
[2:37:18]
wi be wl be cheed. Is
[2:37:19]
thatair?
[2:37:21]
That isbsolutelyorrect.
[2:37:23]
Deputy mayor.
[2:37:25]
Uh, great. Uh, I don
[2:37:25]
t have
[2:37:27]
anhinglse to add. Thank
[2:37:28]
you.
[2:37:29]
Than you. I
[2:37:30]
moingo go bk
[2:37:33]
Councilember Faln.
[2:37:35]
Ankou, MADAM MAY. Um, I
[2:37:36]
ha auestion for the city
[2:37:38]
manager. Just about nexteps.
[2:37:40]
So, uh, obvious, I tnk
[2:37:40]
we
[2:37:41]
re hearing that the strg
[2:37:43]
prerences forrack a and
[2:37:45]
ack b kd of as a lt
[2:37:46]
sort, if notnglse c
[2:37:49]
wo out. So my question I
[2:37:51]
um, what arehe pnned nex
[2:37:53]
step if we have ie appro,
[2:37:55]
adopted a motn tonight t a
[2:37:56]
stf to g bk with bot
[2:37:58]
option stillnhe table are
[2:37:59]
you thenoming back to check
[2:38:00]
in to say this is more
[2:38:02]
formationn thewo options,
[2:38:03]
an which one do youant to
[2:38:04]
pick? And then w make another
[2:38:07]
motion tay bring u back
[2:38:09]
nal and ainal agreeme
[2:38:10]
with one ofhose,ecause I
[2:38:13]
assu tinal agreent will
[2:38:15]
take someorkfter we give
[2:38:17]
u direction on which optio
[2:38:19]
Right. And s how much more
[2:38:20]
work does that create? Because
[2:38:21]
it was initial my
[2:38:22]
understandin tt our motio
[2:38:24]
night was going to be to
[2:38:26]
directou to notiate in
[2:38:29]
orde to bng us back fal.
[2:38:32]
Um a falgreement b I
[2:38:34]
undsike tt MAY note t
[2:38:35]
case It mig be anoerheck
[2:38:37]
in.
[2:38:38]
Wellt
[2:38:38]
s great qstion. So
[2:38:40]
my intent wld beo spe the
[2:38:42]
time toigure out a prosal
[2:38:44]
in partnshipith, e., a
[2:38:44]
bring that backor your
[2:38:46]
apoval.O, um, hearing t
[2:38:46]
uncil
[2:38:47]
pference, we
[2:38:49]
startithitting dow
[2:38:51]
togethert the firetation
[2:38:53]
gisticsenter.Hat areou
[2:38:54]
ping to do? How are you
[2:38:55]
hopingo do it forowong?
[2:38:56]
You kno kind of how does a
[2:38:58]
this wor And the city sta
[2:39:00]
assessing not just tir
[2:39:01]
propos, but wt areur
[2:39:02]
needs?O I couldust give an
[2:39:05]
example if ife use I using
[2:39:06]
half t firetation tre
[2:39:08]
a b ent. How do we ensur
[2:39:09]
th no o from the publi
[2:39:11]
es inthis? Theire
[2:39:12]
statn sid of things. Rig.
[2:39:14]
D we nee initi
[2:39:16]
instments like gates or
[2:39:17]
thin like that. S the
[2:39:17]
just tre
[2:39:18]
s jus a lotf
[2:39:19]
detas tha need t b worked
[2:39:20]
t in the crse o tha
[2:39:21]
diussion. I
[2:39:22]
s possie to
[2:39:24]
runntoome thingshat we
[2:39:24]
can
[2:39:25]
work o togher. I
[2:39:25]
dot it,ut it
[2:39:26]
s possibl
[2:39:28]
And only if the said, this
[2:39:28]
isn
[2:39:29]
t eh. It can t work out
[2:39:31]
for us or we conclud there
[2:39:32]
stuff thathey
[2:39:32]
askedor.
[2:39:33]
We just can
[2:39:34]
give. Would we
[2:39:35]
probably start looking the
[2:39:36]
otherption? B we probably
[2:39:38]
have a coue ideasnind as
[2:39:39]
we go. But t intentould be
[2:39:41]
say in partnership with atc
[2:39:42]
would come t you with one
[2:39:43]
option tha
[2:39:44]
s agreed to for
[2:39:46]
council revie a so.
[2:39:48]
Okay, I guess I guess my my
[2:39:49]
follow question reled t
[2:39:56]
that is, um. At wt pnt is
[2:39:57]
it a couil vers staff
[2:39:59]
decisi to pivot to optio b?
[2:40:00]
If we ge you authoty too
[2:40:01]
to both? Rht.Ecause I can
[2:40:02]
imaginhere could be a
[2:40:05]
tuatio wre,ou know,ou
[2:40:05]
mayhink tha it
[2:40:06]
st
[2:40:06]
sot
[2:40:08]
asible to me forward,ut
[2:40:09]
okay. But council m wanto
[2:40:10]
say, wel we d wan to
[2:40:11]
ncede on tha thingnd we do
[2:40:13]
nt t make it hapn. Sure.
[2:40:14]
R tck I gss that
[2:40:15]
s m my
[2:40:16]
estion is how wil we
[2:40:18]
navigate that. I it tha if we
[2:40:19]
move forrd wh track a, y
[2:40:20]
don
[2:40:20]
need ather track
[2:40:24]
endpoi, butf you think that
[2:40:26]
youeed to gith track, the
[2:40:28]
you com back t councor
[2:40:29]
authorationor tra b. I
[2:40:30]
justeel like I
[2:40:31]
s a, um, it
[2:40:33]
big step to say, y know, do
[2:40:35]
whicher one you want. Right.
[2:40:35]
An then I wld hate forou
[2:40:37]
to come bk wh track and
[2:40:40]
say, wel actually,now,
[2:40:41]
um weant you toush harder
[2:40:42]
for tck, okay?
[2:40:45]
Right. Um, I mean, thank y,
[2:40:46]
uncilmembe GOD I, I hr
[2:40:51]
you. So, the g.He goal
[2:40:52]
is not f sff to dide. The
[2:40:53]
al is w
[2:40:53]
ve been given
[2:40:55]
direction, and preference has
[2:40:56]
been expressed. To go s
[2:40:58]
if we work wit tha I
[2:40:59]
gues what I would s is I I
[2:41:01]
fe like Iad a placehere
[2:41:02]
thereereeral fatallaws
[2:41:03]
or something that council nee
[2:41:04]
to be awa of.Efore there
[2:41:05]
wa the piv, wou come
[2:41:06]
ck and say, h, here
[2:41:09]
two stickin. But in the
[2:41:10]
meantime, w
[2:41:10]
ve done atle
[2:41:11]
bit due diligence about what
[2:41:13]
e alternative mighte.Ou
[2:41:14]
know, I cou be here, it
[2:41:16]
could be her So tt if you
[2:41:17]
hat informationnd you
[2:41:18]
areetti the same
[2:41:19]
infoation about the fal
[2:41:20]
aw, you
[2:41:20]
at lst kw wha
[2:41:22]
thelternative might be. But
[2:41:23]
no, t goal isn
[2:41:24]
t that we
[2:41:26]
would jt say, hey, torrow
[2:41:27]
I, cy manager, h decided
[2:41:27]
it
[2:41:29]
s tck b, and that
[2:41:29]
s what
[2:41:29]
we
[2:41:30]
going toalk about
[2:41:32]
right? But as sd, becau
[2:41:32]
we we
[2:41:33]
re ting to really
[2:41:34]
spect the cil
[2:41:35]
s decon
[2:41:36]
that y heot made a
[2:41:37]
decision. G ahead.Nd y
[2:41:37]
hadn
[2:41:39]
tade a decision to use
[2:41:40]
th fire staon logisti
[2:41:42]
center We just hen
[2:41:42]
t don
[2:41:43]
al the due digence w nee
[2:41:45]
to toakeur it wor right.
[2:41:47]
And I partnersh with wha
[2:41:49]
they Cleive. So we just
[2:41:50]
need some tim to wk throu
[2:41:51]
that But I think we
[2:41:51]
d come
[2:41:52]
ckf we said, h
[2:41:52]
s two
[2:41:54]
hurdles. Dou want uo jp
[2:41:56]
them or n? A her
[2:41:56]
s the
[2:41:58]
pr and cons of it. Y know,
[2:41:59]
weld dinitely dhat
[2:42:00]
befo we gave y ainal a
[2:42:02]
fina disio.
[2:42:02]
Grea
[2:42:04]
Thank y will be you n
[2:42:05]
tter wha becse you
[2:42:05]
ll get
[2:42:06]
e fal agrment for yr.
[2:42:12]
Approval Tnk y.
[2:42:13]
Ar you done?Kay, cy
[2:42:15]
manar. Soould it helou
[2:42:16]
toollowp on Couilmember
[2:42:18]
Falcon? Wld it helouf w
[2:42:19]
were cle on wha o
[2:42:23]
preference I Okay, okay.
[2:42:25]
Th you. Councermm
[2:42:26]
okay
[2:42:28]
And think can awer that
[2:42:30]
estionirectly now. So I I
[2:42:33]
supporteengothions
[2:42:35]
on theableut dinitel
[2:42:36]
pref trackg. I tnk it
[2:42:38]
just aleer cleaner lk uh,
[2:42:42]
easiccess points. Und I
[2:42:43]
think ovell I just sms
[2:42:45]
motraightforward So I
[2:42:47]
defitely, um, would prefer
[2:42:49]
track but defity open to
[2:42:51]
to bot u dending on where
[2:42:53]
the negotiaon ld. Um, and
[2:42:54]
then the last questn of jus
[2:42:56]
at the fal agreent, um,
[2:42:58]
justhingshat weld want.
[2:42:59]
Um,he aeent, I would
[2:43:02]
say jus clear pformance
[2:43:04]
expectat, a pment
[2:43:06]
schedule als based o
[2:43:08]
miston. So I d
[2:43:09]
t I don
[2:43:10]
think the ien I thate
[2:43:12]
would be, y know, sendi
[2:43:14]
0000 check Rht. It would
[2:43:15]
be basedff o certain
[2:43:17]
stones overerio of
[2:43:20]
time. And then, jt by
[2:43:22]
financialesponsibilities and
[2:43:24]
then defed exit or
[2:43:26]
modication for pvisions. If
[2:43:28]
e program for some reason
[2:43:31]
do not uchieve like the
[2:43:36]
ouomhathat wan
[2:43:38]
Thk y. Um, Cilmember
[2:43:39]
Pascal, wre goingo
[2:43:41]
negotiioo didou have
[2:43:42]
mehings youan to sre?
[2:43:50]
Su. Um, mean,, I have
[2:43:54]
overl cmes on waing for
[2:43:56]
th motio.
[2:43:58]
Okay. Council Prem, your hand
[2:43:58]
still.
[2:44:00]
Up.
[2:44:01]
Okay Councilmb t
[2:44:02]
Chisholm d y have
[2:44:03]
methin you wantedo say?
[2:44:06]
Isomody making a motion?
[2:44:06]
Uh, I
[2:44:07]
llo baco
[2:44:08]
Counciemberalcon forhe
[2:44:10]
moon.
[2:44:11]
Than you, Mam Mayor. And,
[2:44:13]
, beaith me. Andry t
[2:44:15]
mofy lgue on t fly t
[2:44:17]
Wa bore we g t a mio
[2:44:20]
I had a qui, um, cment
[2:44:22]
spding touncilmber
[2:44:22]
Prem
[2:44:24]
cments.
[2:44:25]
Aad. Councilmber Arnd.
[2:44:28]
Ay, um Couilmemb had
[2:44:32]
aske about, u, wheth t
[2:44:32]
city
[2:44:33]
sontrution I
[2:44:35]
delived as a lum s or se
[2:44:37]
formf progres paynts.M,
[2:44:39]
and, uh, tt
[2:44:41]
s sething I
[2:44:42]
wodike some more
[2:44:44]
foationbo vers giving
[2:44:47]
directnor. Um, o
[2:44:48]
direio o note
[2:44:49]
ve had
[2:44:51]
sorevious expiee I
[2:44:53]
eingome nonprofs likehe
[2:44:55]
Kirkland Comnity Foundion
[2:44:58]
and, um, and me rently,
[2:45:01]
East Trail Partns, where
[2:45:03]
Kirkla other East Trail
[2:45:05]
members me contrutions
[2:45:06]
start t organation.Oth
[2:45:08]
orgazationsave bee
[2:45:12]
susfully launchednd are
[2:45:14]
nowf-sufficnt andvide
[2:45:15]
more val than the ini
[2:45:17]
vestment as we hop.
[2:45:18]
Um,nd s I thi we h a
[2:45:19]
susful model.
[2:45:20]
M jus
[2:45:21]
curious howe
[2:45:21]
ve hed that
[2:45:23]
modeln the past and whe
[2:45:23]
it
[2:45:24]
justeen, o here
[2:45:27]
e t yournitial see money
[2:45:33]
and yeportingigations.
[2:45:35]
Gohead.Yanager
[2:45:37]
Yo know the ar. It really
[2:45:39]
pends on eac casend every
[2:45:40]
casehere has be an
[2:45:41]
agreemenight? A l
[2:45:43]
agreem that sws tlic
[2:45:44]
fit the city
[2:45:45]
reiving
[2:45:46]
r the m tha
[2:45:47]
s prod.
[2:45:48]
Um, a soaseseou
[2:45:49]
ve
[2:45:50]
mentiod, uh, f examp,
[2:45:53]
with cnityoundatio
[2:45:54]
e agreement had it pd out
[2:45:56]
over ahree yeariod andn
[2:45:58]
expectatn tt other
[2:45:59]
fundraisgccurred.
[2:46:00]
Other exa ise
[2:46:01]
ve given
[2:46:02]
things dtly to like the
[2:46:04]
East Til.M, itlly
[2:46:06]
depe o what we s down and
[2:46:09]
negotio I thinkm, t
[2:46:09]
staff
[2:46:11]
initialntent w n
[2:46:13]
just to say here it I upfront
[2:46:14]
butoave an agreement that
[2:46:16]
set out miless reporti.
[2:46:17]
T w also hen
[2:46:18]
t sketche
[2:46:19]
thatut yet.Oouncil
[2:46:21]
feedback on that. Tt would
[2:46:21]
ry helpful. If there
[2:46:22]
things
[2:46:23]
prefer orhings you don
[2:46:25]
prefer, b typly would
[2:46:26]
just ge itll upront in
[2:46:30]
e lump. So uh, witut
[2:46:31]
spec set o outcome we
[2:46:34]
want to achieve.
[2:46:36]
Ay. Tnk youity manag
[2:46:38]
I thi ttressesy
[2:46:41]
objections And, um, wou
[2:46:42]
supptteveromes forwa
[2:46:44]
ugh negiations in the
[2:46:47]
agreemt wh, what y s a
[2:46:49]
t for proteing the city.
[2:46:50]
Thanou.
[2:46:51]
Ank you
[2:46:55]
yone else?Ncilmemb
[2:46:56]
Falc
[2:46:58]
Thank, Madamor. I move
[2:47:00]
to authorize sta to proceed
[2:47:01]
withegotiations bas on the
[2:47:03]
tool library ilementation
[2:47:05]
pl and to return to council
[2:47:07]
with with eher a prod
[2:47:09]
contct for csideration
[2:47:12]
track a or check wh
[2:47:13]
uncil to consideroceedin
[2:47:18]
with track b if track Aeems
[2:47:19]
inible.
[2:47:22]
Seco
[2:47:24]
Thanou and good job pulling
[2:47:26]
that toget u it
[2:47:27]
s bee
[2:47:28]
d city manager agrees I
[2:47:30]
beoved byncilmemb
[2:47:32]
Falcon. I m not going rept
[2:47:33]
thatond by Councilmber
[2:47:40]
Primm. Cilmemberascal.
[2:47:42]
L right. Yeah, yeah, hav
[2:47:45]
um, some thoughts on o the
[2:47:45]
discuson t we
[2:47:46]
ve had so
[2:47:48]
far. And I wan to speak to
[2:47:50]
this mion. Um,ut first, I
[2:47:52]
just wd tohank sta for
[2:47:54]
all work you io this.
[2:47:56]
Dant t startlso
[2:47:58]
emphasiz tha younow,
[2:47:59]
do tnk a too libra doe
[2:47:59]
seem
[2:48:01]
Like a goo ideut the
[2:48:04]
coerns want toalk a
[2:48:05]
reing this cptlly
[2:48:06]
e how thehe cit
[2:48:07]
s role in
[2:48:09]
it. And s theirst thing is,
[2:48:10]
honestl don
[2:48:11]
t wn
[2:48:12]
nvinced that it w a
[2:48:13]
finallyustainab
[2:48:15]
proposal We only reived o
[2:48:18]
proposal, and its financial
[2:48:20]
ies hea a variety
[2:48:22]
ofnsubstanated aumptions.
[2:48:23]
Ion
[2:48:24]
tvidence that
[2:48:25]
outside fundi has been
[2:48:28]
secud, and befeesting
[2:48:29]
ayer drs, Illyo
[2:48:30]
think w nd greater
[2:48:32]
confiden I ts organizn
[2:48:34]
that t organation can
[2:48:36]
succeendas secured
[2:48:37]
fiial backing andupport
[2:48:38]
alread fro oer comty
[2:48:41]
organizaons.Nd I s thi
[2:48:42]
cause I
[2:48:43]
s m underanding
[2:48:44]
that Shorene Tool Library
[2:48:46]
waunded by the Washingto
[2:48:47]
Departf Eco, King
[2:48:49]
Coty Solid Waste, and the
[2:48:51]
Cities of Shorene and Lake
[2:48:53]
Forestark f entities. Here
[2:48:55]
we have one c a offerin
[2:48:57]
$1,000 with nother
[2:48:59]
mmitted financi bac.
[2:49:00]
Ano, I thi t limitur
[2:49:02]
risk we really shod requi
[2:49:04]
additional fcialking
[2:49:05]
from pareranizatio. So
[2:49:06]
ou money is mat against
[2:49:10]
other moneyecond, Itill
[2:49:12]
have a lot ooncernsbout
[2:49:12]
the c
[2:49:13]
s longm
[2:49:15]
commit.W t there
[2:49:17]
nguage treut, y
[2:49:18]
know not needi more mon
[2:49:20]
but the rfp intentily
[2:49:23]
voredposals tha do
[2:49:25]
rely upoity prope Yet
[2:49:26]
the prerred on in our
[2:49:28]
dision here ftill
[2:49:29]
ses on the feogistics
[2:49:31]
building. Ihink tha this is
[2:49:32]
going to creedditiona
[2:49:34]
puic subsidy tha
[2:49:37]
reflec ongoing c.T
[2:49:39]
going ruestions aut
[2:49:41]
city s nee liabili
[2:49:43]
matenance a otherngoing
[2:49:46]
resours. Then final
[2:49:47]
one subjecttasn
[2:49:47]
t bn
[2:49:49]
talked aut, tt I ve heard
[2:49:51]
andt I feel is Illy
[2:49:53]
ve crns a whether
[2:49:54]
this process has been abo
[2:49:57]
oach. W public fds a
[2:49:58]
involved, dionseally hav
[2:50:00]
to be f b the also m
[2:50:04]
be perce as fai And
[2:50:05]
former counc member
[2:50:07]
participat in budget
[2:50:08]
decisionhatunded this
[2:50:11]
program,ncluding a v to
[2:50:13]
appre taxpalars in
[2:50:15]
last Decbersoday
[2:50:17]
primary conct on only
[2:50:19]
proposale received. I thi
[2:50:20]
that put us, ente
[2:50:22]
counci staff in a
[2:50:23]
diffult posit The
[2:50:26]
lationshs reqre an e
[2:50:27]
high levf transncy
[2:50:29]
and scrut Iieve it also
[2:50:30]
raises queionf wheth
[2:50:31]
we nd to looking atur
[2:50:33]
code eths,nd wheth
[2:50:35]
thatuld be updatedo
[2:50:36]
design a wng period
[2:50:38]
af someoves office
[2:50:40]
before theyanobby, council
[2:50:42]
or s onalf of clit
[2:50:44]
or oization. I believe thi
[2:50:46]
situatio d raiome
[2:50:47]
ethilcerns with the
[2:50:48]
public, and itakese, as a
[2:50:49]
counl membe vy
[2:50:51]
uncomforble. But Inow
[2:50:54]
in the mority on this that
[2:50:55]
otrs majority isn
[2:50:56]
t going to
[2:50:59]
agree on anyf wt I sai
[2:51:01]
Um,ut w request the
[2:51:04]
llowing,m, one tha we
[2:51:06]
requiredditionamitted
[2:51:08]
finaial backing sho tha
[2:51:11]
th is aeal proposal.
[2:51:13]
n in suppo o track,
[2:51:16]
um, if that m forward
[2:51:17]
oreforet mesorward,
[2:51:19]
d le to underd do a
[2:51:21]
full revie of ourpace nee
[2:51:26]
as aity. Um, youw, there
[2:51:27]
was somestions rd in
[2:51:30]
public comment. Um, y know, I
[2:51:30]
don
[2:51:31]
I don
[2:51:32]
t underand it
[2:51:33]
sounds likehe Etsideool
[2:51:34]
llective is n a legal
[2:51:35]
tity,nd it
[2:51:35]
oingo be
[2:51:37]
sponsod theth Kane
[2:51:39]
Tool Libraost I
[2:51:40]
a leg agement?S
[2:51:42]
that goingo wk for us? And
[2:51:44]
is that other entit iood
[2:51:46]
standing with ther, you
[2:51:47]
know,shere o issues
[2:51:48]
there? Inke need to lk
[2:51:50]
intohat a make sur um,
[2:51:52]
d then fly, you kno at
[2:51:54]
so point not n,ut
[2:51:55]
late we d neeo look into
[2:51:57]
ethics code about
[2:51:59]
situationsf departe council
[2:52:00]
membee a sg
[2:52:03]
ethi code about existnd
[2:52:04]
sittingouncilbers, b we
[2:52:06]
need tonk about once
[2:52:08]
councilbers lea office.
[2:52:09]
, many oer orgations
[2:52:11]
have that actllyther cities
[2:52:14]
and cies. Um, so that s
[2:52:15]
those a the ts tt are
[2:52:16]
on m mind right nowith thi
[2:52:19]
proposal. T y.
[2:52:29]
Thank you. Ae else? Depy
[2:52:32]
mayor.
[2:52:34]
Uh, tnk you MADAM MAY u
[2:52:37]
It t speak up on just two
[2:52:39]
thin One,ealize I
[2:52:41]
mike ear. I think
[2:52:44]
comments werelear. I m
[2:52:47]
tr a, and Ieant that, um,
[2:52:49]
coms wer you know, I
[2:52:52]
do want toake sure, uh,hat
[2:52:54]
ase evalue, track a
[2:52:57]
perhap t the primack
[2:52:58]
th we doet a much
[2:53:00]
inrmationse possibl can,
[2:53:02]
uh, f staffbouthatt
[2:53:03]
will mea I don
[2:53:04]
think um, I
[2:53:04]
do
[2:53:05]
t think fl rw of
[2:53:08]
r space needs is realist
[2:53:11]
Um,t woulday
[2:53:13]
implemtation for a v lg
[2:53:14]
time t do a ful some kind of
[2:53:16]
ll stregic pla onll the
[2:53:19]
typace needs Bute all I
[2:53:19]
think we
[2:53:20]
I think staff is
[2:53:21]
heing that all want t
[2:53:24]
make sure uerstand, uh,
[2:53:27]
what t its are of
[2:53:29]
tr a and use of, of staon
[2:53:32]
on atstur nterm.
[2:53:36]
Space aation. Um, my
[2:53:38]
last cnt is,m, I
[2:53:38]
ll
[2:53:40]
look toity manager, city
[2:53:43]
atrney. B kno I f
[2:53:45]
expecthat any negiated
[2:53:45]
agreemte
[2:53:46]
reoing toave
[2:53:47]
repsnd wranties, we
[2:53:47]
re
[2:53:48]
goin to haveovenant
[2:53:50]
fincialenants. Um, w
[2:53:50]
re
[2:53:52]
going tave all theort o
[2:53:55]
strd, u cland
[2:53:56]
protve clauseshat are
[2:53:58]
gog to ensur that, um,he
[2:54:00]
organizaon is incorrated,
[2:54:02]
th it has um,he final
[2:54:03]
backg I hasresented
[2:54:06]
that it w hav um, so,
[2:54:09]
I l to I ldo staffo
[2:54:10]
that, um, diligently and
[2:54:12]
proficiently in text, u
[2:54:13]
next stage. And
[2:54:14]
lle curious
[2:54:15]
to s whathatooks like
[2:54:17]
en it ces but, um, I
[2:54:18]
thk you
[2:54:19]
heard that want
[2:54:21]
the protectio but I also
[2:54:22]
kn tha t
[2:54:23]
s the kind
[2:54:25]
thing tm, staoulde
[2:54:27]
g as a mrf, uh, it
[2:54:29]
ofessional, um, profiency.
[2:54:31]
Ank y.
[2:54:32]
Thank you
[2:54:33]
u.
[2:54:36]
Dare. Cncilber Arnold.
[2:54:38]
Um, thank y, mayor
[2:54:39]
Um.
[2:54:43]
First,h u responso
[2:54:44]
one of t points that
[2:54:46]
Councilmembe Pascal, uh,
[2:54:48]
brought u the whole process of
[2:54:51]
starting a n 5 It s
[2:54:52]
fairly commo w invd
[2:54:54]
inhis wh ano
[2:54:57]
ornization whe there is
[2:55:00]
an exiing 501 c3 tha
[2:55:01]
provides the fisca sponsorsh
[2:55:04]
and whatt aows isor tax
[2:55:06]
ductible contributio to
[2:55:09]
to tew oanization as it
[2:55:12]
set with o, um
[2:55:16]
approved five 050tatus. It
[2:55:18]
is I the east side Too
[2:55:19]
Collec
[2:55:21]
s interestn
[2:55:23]
ensuri thatheir fiscal
[2:55:25]
sponso in goodtanding,
[2:55:28]
cause that allows them to d
[2:55:30]
ndraisin pte
[2:55:30]
fundraisg that
[2:55:31]
s tax
[2:55:33]
deductible So I m condent
[2:55:34]
thtever qions tha
[2:55:36]
ca up dg public cment
[2:55:38]
at meetiight can be
[2:55:42]
addres u secondlm, to
[2:55:44]
wrap up, did conveions
[2:55:48]
counc, uh, last w a
[2:55:52]
uh Oddityark and, um, while
[2:55:54]
e proposalsmast s to
[2:55:56]
a library include someople
[2:55:58]
that h beenery invol in
[2:56:01]
the cmunity and u fr
[2:56:04]
council mem sweet um,
[2:56:05]
thate bee passion abo
[2:56:07]
this a wanng put this
[2:56:10]
togeth. I a had three
[2:56:12]
le comend wtoalk in
[2:56:14]
support of the tool libra
[2:56:15]
with me.Ing conations
[2:56:18]
th council that were, u the
[2:56:20]
pelet that programs
[2:56:21]
targeted, that these were
[2:56:22]
le that we hn
[2:56:23]
teen
[2:56:26]
fore, uh, thateople tha i
[2:56:28]
had, uh,ust met forhe fir
[2:56:30]
time tha werxcited abo
[2:56:32]
thepportunity. And so I
[2:56:32]
m,
[2:56:34]
um, I think the is suppo
[2:56:35]
for this, and I
[2:56:36]
mxcited t
[2:56:40]
ve forward. Thank y.
[2:56:41]
Ank y Couilmember Tim
[2:56:42]
Chislm.
[2:56:42]
Uh, thank.
[2:56:44]
U.
[2:56:46]
, I eluating this
[2:56:48]
proposal, I looked ahree
[2:56:50]
factors. One was communi
[2:56:52]
suppt. The sec was
[2:56:54]
fiial sustaility, and
[2:56:58]
third washe proce. Um,
[2:56:59]
I was tonths agot
[2:57:01]
neorhood organizat and
[2:57:02]
th Kirkland Assiation of
[2:57:04]
Neighbhoods were goi to b
[2:57:07]
supportive of this and offer,
[2:57:10]
letters ofupport. I
[2:57:11]
haven
[2:57:14]
t seen that materlize.
[2:57:17]
On MAY 5thlso recei an
[2:57:19]
ailromhe chair o the
[2:57:21]
Kirkla Cmunity Fouation.
[2:57:23]
At e wasn his oicial
[2:57:27]
pacitynd reprented that,
[2:57:29]
in hisfficial city,
[2:57:30]
at there w sportor the
[2:57:32]
ol lrary. T subctf
[2:57:34]
that 5th email was
[2:57:36]
ement in support o Too
[2:57:39]
Liy inkland. That led
[2:57:41]
me to bve three mons ago
[2:57:42]
that Kirkld Communi
[2:57:43]
Fodation was deeplynvolved
[2:57:45]
in thi tha t supported it
[2:57:46]
an that t wou be
[2:57:48]
communitupportnd likely
[2:57:50]
final suppo comin fm
[2:57:53]
e commutyoundation
[2:57:54]
Yesty, Irified this
[2:57:56]
with execuve dector of
[2:57:57]
thekland Communi
[2:58:00]
Fotion,nd she clari
[2:58:01]
the Kkland Comnity
[2:58:03]
Founon has no forma
[2:58:05]
posi on the too library.
[2:58:08]
Theye pledged $, andhey
[2:58:10]
contribed $0 to this
[2:58:14]
to library Ilso ld a
[2:58:16]
theancialustainabity
[2:58:18]
this m, and I
[2:58:19]
ve nedhat
[2:58:20]
they havot yet raise a
[2:58:22]
money. T have n y s
[2:58:24]
anyberships and theo
[2:58:25]
not haveny moneyn t
[2:58:28]
bank As f as kno their
[2:58:31]
businessn include $42,000
[2:58:33]
out of o $100,00 whi
[2:58:35]
uld pottiallye s on
[2:58:37]
th salary of an exetive
[2:58:41]
dior of tl lry. I
[2:58:44]
beeve that when theye
[2:58:45]
starte thi t thisas
[2:58:46]
generay going to be
[2:58:48]
community drivenhing by
[2:58:50]
volunt, and nothat we
[2:58:54]
were nng to spendost
[2:58:56]
lf of money contred
[2:59:00]
on thealary o anloyee.
[2:59:03]
, I don
[2:59:05]
think $100ill
[2:59:06]
be the e ofhis. I think we
[2:59:08]
will a lime
[2:59:10]
sucription of suprting thi
[2:59:11]
libra, because I haven
[2:59:14]
seenny evide that they
[2:59:18]
have financial sup. Ao
[2:59:20]
lookedt the pss by whi
[2:59:23]
follod We have one r
[2:59:29]
reonse and no othersncil
[2:59:30]
mber Pasca
[2:59:31]
s concesbout
[2:59:33]
thethical imptionsf
[2:59:37]
is and the perption tt
[2:59:38]
communi will have are
[2:59:42]
directly ooint andht on
[2:59:45]
targ. I haveeriouscerns
[2:59:47]
aboutoving forwa w thi
[2:59:50]
I think tt thea of a tool
[2:59:52]
brary is a goo one, I
[2:59:53]
appreciate staff
[2:59:54]
ork
[2:59:56]
this, but ts is not currently
[2:59:57]
inable. It
[2:59:58]
sotrently
[2:59:59]
ready for annfusionf
[3:00:01]
capita support either
[3:00:07]
terminating, uh.S,
[3:00:10]
projt o I support uh,
[3:00:13]
moving forwa wit addnal
[3:00:16]
rk t get additiol r
[3:00:18]
oposals. We shoulde ablo
[3:00:21]
select from threr more
[3:00:24]
RFroposals fm a broad
[3:00:27]
section of um organizatio
[3:00:30]
that quafiedo do this.
[3:00:32]
Uh, theearance ofne rfp
[3:00:34]
proposal does not, in my
[3:00:39]
inion, l prope
[3:00:39]
d lik
[3:00:41]
to see m rfp psals if
[3:00:43]
reerious a this. Um,
[3:00:45]
d I willeotingo o ts
[3:00:48]
motion.Nd t tool lrary
[3:00:54]
, um, as a cpt is
[3:00:55]
whichhink wth
[3:00:58]
pursui.Ut w one
[3:01:00]
proposal, thi test
[3:01:02]
option right is to mov
[3:01:05]
forwd with, soling
[3:01:07]
other proposa fromer
[3:01:10]
organizaso thatave,
[3:01:12]
um,everal qlified
[3:01:14]
organitions tovaluate.
[3:01:17]
Ank you
[3:01:23]
Thank you Uh, Depy Mayor.
[3:01:24]
Uh, tha you Madamayor.
[3:01:26]
Jus wanted to speak one
[3:01:27]
moreime. I support of the
[3:01:29]
tion andddress somf the
[3:01:30]
commenh, fro m
[3:01:31]
lleagues. Ippreciats
[3:01:34]
conversa. Um, kno I
[3:01:38]
ant to not that if you a
[3:01:40]
plng to form a 501, c3
[3:01:42]
oration, it s notoing to
[3:01:43]
me as surpris tha you are
[3:01:44]
t going t raise money unt
[3:01:46]
youave your 5 c3tatus,
[3:01:49]
and tho contributiore are
[3:01:52]
indeed,h, t deductibl Um,
[3:01:54]
m not overly conrned about
[3:01:58]
fundin a uh, a position, a
[3:02:02]
positi within a, uh, a
[3:02:04]
project lik thi did tha
[3:02:05]
th the Commu Foundatio
[3:02:07]
We support uh, thecutive
[3:02:09]
dictorary.M, so w
[3:02:10]
ve
[3:02:12]
dohisind o support in
[3:02:13]
the past with organizatio
[3:02:16]
inuding earmaed support
[3:02:18]
dividualff. And we don
[3:02:19]
wayse the benefit of
[3:02:22]
multipsithach trail
[3:02:24]
with the comty foundn,
[3:02:26]
they were organizatio
[3:02:29]
uh tha um, htepped
[3:02:31]
fod to delernhe goals
[3:02:32]
and objecti t we
[3:02:32]
going
[3:02:34]
to deliv cnity bits.
[3:02:35]
Andhat wasn theence o
[3:02:37]
an rfp. Sometimesou putt
[3:02:39]
on rfp austou do, in
[3:02:41]
fa gethe one respo And
[3:02:42]
thenhen thatappens,
[3:02:44]
evaluate that rnse, uh, on
[3:02:46]
its merits, wch Ink we
[3:02:48]
ing inhisase,ncluding
[3:02:50]
,ecting the staff in many
[3:02:52]
wa toake sure that theyre
[3:02:53]
doingheir,h, ty
[3:02:54]
re,
[3:02:54]
they
[3:02:55]
re taking digent
[3:02:57]
approach to these negtions.
[3:03:00]
, so appciate tt. Um,
[3:03:04]
d the um, l
[3:03:04]
s t and
[3:03:05]
think I there
[3:03:06]
ny other
[3:03:07]
pointshat Ianted to make,
[3:03:09]
bu I think thathat covers
[3:03:11]
it.M, oiously I will be
[3:03:12]
suting the mn to
[3:03:13]
proceed w the nextp.
[3:03:15]
Than
[3:03:17]
ankou, Cncilmember Primm.
[3:03:17]
Ye I.
[3:03:19]
Just h a very good question.
[3:03:23]
F city man om,
[3:03:25]
legal. Sonhe
[3:03:28]
agreemen that we have and I
[3:03:28]
just wano aresshis
[3:03:30]
whol um,inancial
[3:03:32]
sunability uh, iss that
[3:03:34]
ou um,hat Couilmember
[3:03:37]
Pascal and Timhisholm he,
[3:03:40]
, have, um,rought to light.
[3:03:45]
There a way to tie tm,
[3:03:47]
tie the milestonements
[3:03:52]
an examp or haveome, u
[3:03:54]
rangement within the within
[3:03:56]
the agreeme itselfo tha
[3:04:00]
are only paying out funds w
[3:04:02]
we know ore se connce
[3:04:03]
that the entit will be
[3:04:06]
financiayble or that
[3:04:07]
tra, or tha we
[3:04:07]
getting
[3:04:08]
external.
[3:04:09]
Support.
[3:04:10]
Or thathey a getting
[3:04:11]
extern
[3:04:16]
ort.
[3:04:19]
Theityttorney. Uh,
[3:04:23]
th short answe is yes.M,
[3:04:24]
would say I gss two thing
[3:04:25]
two this tha o is at least
[3:04:26]
thay the cil
[3:04:27]
apriated mon a the
[3:04:29]
conversahat the
[3:04:30]
intent thi moneyaso be
[3:04:33]
artup moneyight. Uh,
[3:04:35]
s not year three mon once
[3:04:35]
they
[3:04:36]
re going. Hever,aving
[3:04:38]
id tha Ihink the inten
[3:04:39]
of the stas to say, you
[3:04:40]
know, whas yourlan? How is
[3:04:42]
the fdraisingoing And set
[3:04:43]
miones and reporting
[3:04:46]
requirts? Uh,nd so
[3:04:49]
think it I our inten to hav
[3:04:51]
an agrment that is helping
[3:04:52]
ensure itsanciallyiable.
[3:04:54]
And so doingur due dilig
[3:04:55]
on tt. But I do think there
[3:04:58]
early an intt lst a
[3:05:00]
the counc that this is
[3:05:01]
help in that.Ight. And so
[3:05:01]
it
[3:05:01]
s it
[3:05:02]
s a key sing point,
[3:05:03]
whher that
[3:05:03]
for staff or
[3:05:04]
whethet
[3:05:04]
sor a sta
[3:05:06]
co orurchases and s
[3:05:08]
forth, I top the get
[3:05:09]
the ground. Thinke
[3:05:10]
wod be looki ver cully
[3:05:11]
atir nt ste
[3:05:13]
particulased o cncil
[3:05:14]
feedback, b also our due
[3:05:16]
dilie is now tha you
[3:05:17]
kn weothe go ahead
[3:05:18]
which t de they hadn
[3:05:19]
t been
[3:05:21]
n,ou know, wha is your
[3:05:21]
fundrainglan and h
[3:05:23]
ccessfuls I being?E he
[3:05:24]
few mons to fig tt out
[3:05:24]
ile we negte t
[3:05:26]
agement. U I woulde
[3:05:28]
my intentoelp reportn
[3:05:29]
at whene comeack to you
[3:05:30]
anday it
[3:05:31]
the l tee
[3:05:32]
mo sin youtaw us,
[3:05:32]
re
[3:05:32]
s w
[3:05:33]
s hpened, and
[3:05:33]
he
[3:05:34]
sow w feel goodut
[3:05:35]
it. Ion
[3:05:37]
Okay. Thank you.
[3:05:40]
Appreciate I.
[3:05:43]
Okay. Anyone else? All right
[3:05:45]
m going take shot at
[3:05:47]
th. U we suping
[3:05:49]
the motns, uh,
[3:05:51]
Counember Arn was car.
[3:05:53]
We. There lot o pubc
[3:05:55]
enthiasm forhis, ande
[3:05:57]
have bee talkiut it f
[3:05:57]
years, think
[3:05:58]
ll serve
[3:06:01]
the comty well. Um, I am in
[3:06:02]
pport of, uh, I he a
[3:06:06]
preferen Fire station 27.
[3:06:08]
Agree wit Dep MAY
[3:06:09]
th we do nott tow
[3:06:12]
down this proct while we do
[3:06:15]
tegic plan forg term
[3:06:16]
use ofur plic buildgs,
[3:06:19]
but d f le need a
[3:06:21]
plan We have a nr of
[3:06:23]
ildings that we arenging
[3:06:25]
online a I wouike toee
[3:06:26]
how all thatce is going to
[3:06:28]
besed over the y, and
[3:06:28]
th
[3:06:30]
s incng the bldings
[3:06:31]
that we re exploriublic
[3:06:35]
works. Um, and I want, Id,
[3:06:37]
I feel nd to respond to
[3:06:40]
criticism o comnity leaders
[3:06:42]
that havved comty
[3:06:45]
for decades Uhe, the
[3:06:47]
allegation tha there s an
[3:06:49]
hics viola, this ms
[3:06:50]
not goi intonyone
[3:06:53]
pockets.Hesere people who
[3:06:56]
have brackwards to
[3:06:59]
serve our comnity many,
[3:07:01]
ma capacies. And I
[3:07:04]
grathem for
[3:07:06]
chpioning thisject,
[3:07:08]
taki their ownersonal tim
[3:07:11]
to put it together, toally
[3:07:13]
the cnity, to getdback
[3:07:15]
from themunity. I tnk
[3:07:15]
they
[3:07:17]
ve done goo j and
[3:07:18]
t thi it
[3:07:19]
fr to
[3:07:22]
critize them for and me
[3:07:23]
any s o allion.
[3:07:23]
Yo don
[3:07:24]
t the lasord on
[3:07:26]
this Ifou wan toort,
[3:07:26]
yo don
[3:07:27]
t a.
[3:07:28]
Memb.
[3:07:31]
m not in as chair retort
[3:07:35]
Rememb ten, ten. Iave
[3:07:36]
ited unt.
[3:07:36]
We
[3:07:36]
re out.
[3:07:39]
Of work. Last Council membe
[3:07:43]
Tim Chishol So have
[3:07:45]
finied my remar and if
[3:07:47]
Council member Tim see
[3:07:49]
Counci Memberrim woue
[3:07:50]
to raise her hand.Hankou.
[3:07:56]
Councilber prim. Council
[3:07:57]
member b, did you hav your
[3:07:58]
ha up?
[3:07:59]
All right.
[3:08:01]
Okay. The questsn the
[3:08:02]
moon made by Councmember
[3:08:04]
Fa, sd Council
[3:08:05]
member priouncilmeer
[3:08:07]
Falcon, will you do us the
[3:08:15]
vor of repeating yr motio
[3:08:16]
Would y like to repeat.
[3:08:19]
It?
[3:08:21]
Cilmembe Falcon, y
[3:08:21]
re
[3:08:24]
mute.
[3:08:27]
Thank you, thank. Yes.
[3:08:27]
Attney, tha would b
[3:08:28]
woful.
[3:08:29]
Thank.
[3:08:30]
ll rept tha for you. She
[3:08:31]
de a motion to authorize
[3:08:32]
stf proed wit
[3:08:34]
negotiations based on the tool
[3:08:37]
liy impntation plan and
[3:08:38]
returno cncil, eitr
[3:08:39]
th a pposed conactor
[3:08:41]
nsideratn tha uses tra a
[3:08:43]
or ack I withncil on
[3:08:45]
trac b, if track eight proves
[3:08:48]
infeas.
[3:08:50]
L r. Thank you,ity
[3:08:52]
Attorn. All tse for,
[3:08:54]
ease say aye.
[3:08:57]
Ayeye.
[3:08:59]
All thoseosed?
[3:09:00]
No.
[3:09:06]
Tionarries five,wo. Thank
[3:09:09]
you eryone. I I n 917. So
[3:09:09]
we
[3:09:10]
re going take a break and
[3:22:13]
we will be b at 9.
[3:22:15]
Sorry about that. Itook a
[3:22:16]
cond t get ld bk in.
[3:22:19]
. A r.O,h, so this
[3:22:22]
ur ccknn affordabl
[3:22:24]
housing, on faith owned l
[3:22:25]
wh is herouncil dtion.
[3:22:27]
Tonigh bef we goack t
[3:22:28]
thlanning commission, Ie
[3:22:30]
to walkou throu ourraft
[3:22:32]
coderoposalsustin, our
[3:22:33]
depu directo oflanningnd
[3:22:35]
building.
[3:22:36]
Thank youity manager And
[3:22:38]
go evening mayor, dy
[3:22:39]
mayor and council members u
[3:22:41]
reere tonight to giv you
[3:22:43]
our sd briefing to o
[3:22:44]
thffordabl hou, on
[3:22:46]
faith own land project. U
[3:22:48]
this a task onhe adopt
[3:22:50]
20 t 2028nningork
[3:22:52]
prm, a itsntention is
[3:22:54]
to impment ste llation
[3:22:55]
the cy I reqred to
[3:22:57]
ly with. I have tlides
[3:22:59]
informati for you ton
[3:23:00]
beforeump Wand t
[3:23:02]
note that our lead senio
[3:23:03]
planr on t proje is
[3:23:05]
Sc Gutr. Um, Scott is n
[3:23:07]
ab to b he ton, so I
[3:23:08]
will do my best toepresent
[3:23:09]
the gooorkhat he has done
[3:23:12]
on thi project u w l
[3:23:13]
ed to y about this
[3:23:16]
projt back in MAY, and at
[3:23:17]
thate w ask y fore
[3:23:19]
scopirection. Um, athat
[3:23:22]
time, cild us toase
[3:23:24]
anysityuses geno
[3:23:25]
fah owned ldt
[3:23:28]
provg affordabl hou
[3:23:29]
base those bonuses o
[3:23:31]
rlyingone stads,
[3:23:32]
ere tho faith bas
[3:23:34]
operties areocated. You
[3:23:36]
asked us to pvide a buy write
[3:23:39]
permissi f tse bes.
[3:23:40]
Um, pnning Commission
[3:23:41]
ited on the couil
[3:23:44]
direction and ehasizedhat
[3:23:45]
the cod ament sho add
[3:23:48]
ibility. But to kp the
[3:23:50]
ineases fairly mest,
[3:23:52]
particul in low den
[3:23:56]
zoned a Since we talke t
[3:23:58]
u, um, staff has been out
[3:24:00]
doing q ait of outreh.
[3:24:02]
Um, prily with faith bed
[3:24:04]
organitions and also wh
[3:24:06]
nsortium and organizns
[3:24:07]
that repsentultiple
[3:24:09]
stakders, wheer I b
[3:24:10]
fait based orgations or
[3:24:12]
fordable housi develop
[3:24:12]
We
[3:24:14]
ve alsoeenrdinatin
[3:24:16]
verylosely whrch o ts
[3:24:17]
project to hperstand some
[3:24:19]
he mart andsibility
[3:24:20]
cothat goe I
[3:24:22]
pring,evelopments
[3:24:24]
that ide hh perage
[3:24:26]
of afforda housing units
[3:24:30]
at are ie rested fm
[3:24:33]
that outreacm, welly
[3:24:34]
d a f ts, and you
[3:24:36]
hearhem alrdy tonht in
[3:24:37]
public com perio We
[3:24:39]
real heard from fai bas
[3:24:40]
organizaons that they would
[3:24:41]
apeciate aery
[3:24:43]
strahtforward proce b
[3:24:44]
themnd affordae housi
[3:24:46]
develors appreciat
[3:24:46]
flexibity. Tha
[3:24:48]
s rlly key
[3:24:50]
ven thatffordable housing,
[3:24:51]
especial when provid as
[3:24:53]
higherercentag o aotal
[3:24:55]
velopmen is difficult to
[3:24:57]
make fblen this mket
[3:24:59]
andlways so flexibi was
[3:25:01]
lyey for a lotfhem.
[3:25:02]
Um,m the fased
[3:25:04]
orgazationpecifically, the
[3:25:05]
d iterahat you h
[3:25:06]
earlie tight tty
[3:25:06]
aren
[3:25:07]
affordae housi
[3:25:08]
delopersn andf
[3:25:09]
themselv They ry don
[3:25:12]
ld t eertise inhertly.
[3:25:15]
Um, and sooedhat
[3:25:17]
there wil be ad for some
[3:25:19]
ort bey code amendments.
[3:25:22]
Um programmatiy. And with
[3:25:24]
that feedbac we really took
[3:25:25]
th to hea a triedo
[3:25:27]
incorpor it into our code.
[3:25:28]
Amendmts pnted t you
[3:25:30]
tonight.
[3:25:30]
Ll t through
[3:25:32]
how we d that in t code
[3:25:33]
amdments in just a moment
[3:25:37]
he.Efore jum io
[3:25:38]
summar ofhe codndments
[3:25:40]
thatere inclu yr
[3:25:42]
packet did wt toote,m,
[3:25:45]
st go over briefly a map
[3:25:46]
the exig fth owned
[3:25:49]
operties Kirklan So
[3:25:51]
the are 37 oizations we
[3:25:53]
found ttperate Kkland
[3:25:55]
today. U tho 3
[3:25:57]
organitions own4 tot
[3:26:00]
parcm, a total of 160
[3:26:02]
res in the cy. Um, man
[3:26:04]
ose parcelsre quite lar.
[3:26:05]
Um, a you c probablhink
[3:26:09]
ofm. Um,o 1 of the are
[3:26:11]
morenwo a. U and a
[3:26:13]
lof tho faith based
[3:26:14]
orgationshat youee
[3:26:16]
ally owneveralnderlyin
[3:26:17]
parcels tt compr
[3:26:18]
subjropertyhat the MAY
[3:26:21]
be openg at a lever
[3:26:23]
half tsearcels exist
[3:26:24]
today in low density
[3:26:27]
rentialones. Um, just a
[3:26:28]
le of them a in mediumr
[3:26:30]
high dentyidentialones.
[3:26:31]
And then the raining
[3:26:34]
apimately 40% are I zones
[3:26:35]
that aeadyow a lit bit
[3:26:37]
er delopment. Either
[3:26:38]
offi, comial,
[3:26:39]
institutio oransit
[3:26:41]
orieedelopment zones Um,
[3:26:44]
anhen several o the z,
[3:26:46]
, thisind of,m,imilar
[3:26:47]
to all o Kirkld, but seral
[3:26:49]
theroperties, um, do
[3:26:50]
ntain ccalas that
[3:26:52]
wouleed toe facto into
[3:26:56]
futuevelopment. So with
[3:26:58]
that Iant to quick riew,
[3:26:58]
um, what
[3:26:59]
n your packet? Just
[3:27:01]
give aummary of the dra
[3:27:03]
demendments. Um, the dra
[3:27:05]
amendnts wld add aew
[3:27:06]
sectn t our affordable
[3:27:08]
hog chapter inhe Kkland
[3:27:10]
zoning ce. Um, and theyould
[3:27:11]
based onhathe sold
[3:27:13]
us we h t do. So the state
[3:27:14]
quires u tovidee
[3:27:18]
type of,m,apacity bonus for
[3:27:19]
properties or develnts tha
[3:27:21]
arevidingher0% of
[3:27:24]
thei total uni a 8 Ami or
[3:27:28]
20 of t uts at 50% Ami.
[3:27:28]
Anhat
[3:27:30]
more than we rre
[3:27:31]
as pt of any of o
[3:27:32]
rdable housing reqrements
[3:27:34]
y. Sosould b beyond
[3:27:35]
what weuirenur current
[3:27:37]
code. Andhe state requis us
[3:27:39]
tovide somesity bes
[3:27:40]
for develnt t
[3:27:40]
s doing
[3:27:42]
th. Sot
[3:27:43]
s ded,
[3:27:45]
it wld only b applican
[3:27:46]
parcel that are owned by a
[3:27:48]
faithed oanization. And
[3:27:50]
um, put simply, what we
[3:27:52]
di wase lookedt the
[3:27:54]
exting undlying zonesnd
[3:27:56]
rovided a modest den
[3:27:58]
increase, um, basedn t
[3:27:59]
rlying zonino we
[3:28:01]
basicallyook low density
[3:28:02]
zone and said, what
[3:28:04]
averag ht allow I a low
[3:28:06]
nsity zone? A what would
[3:28:07]
kindf anremental step up
[3:28:09]
the nex dense zone
[3:28:10]
And that
[3:28:11]
s how we looked
[3:28:12]
at their height bonus would
[3:28:14]
be. U and the samee looked
[3:28:16]
a medium denty zone.
[3:28:16]
What
[3:28:17]
s the aveeight
[3:28:18]
mediumensityones
[3:28:19]
resident developme and
[3:28:21]
gave them anncrement sp
[3:28:23]
t ah denty ze. So
[3:28:23]
at
[3:28:26]
what tha rates to or
[3:28:28]
result ins than l
[3:28:30]
density zes, um,ee a
[3:28:31]
few vying heights across t
[3:28:32]
ci inhose low density
[3:28:33]
zos. We
[3:28:34]
ve talked about that
[3:28:36]
aittle bithou bef
[3:28:37]
Um butn average, aot o
[3:28:39]
have a 30 foot maximum
[3:28:40]
bungeight resential
[3:28:43]
developm today. Um, u
[3:28:45]
this bonus,heyould g up
[3:28:47]
to 3t ify wer provi
[3:28:48]
that that state reqred
[3:28:50]
minimum amot of affordable
[3:28:53]
hog. Um,nd then mediu
[3:28:55]
nsity, they wou gorom
[3:28:56]
to 40.O a modes height
[3:28:59]
crease, uot coverag was
[3:29:00]
othertandardhaterd
[3:29:03]
cod help. Um, if, uh,
[3:29:04]
projects kind of become
[3:29:06]
feasiblef we were flee
[3:29:08]
with tha And for that, one o
[3:29:10]
the thingst we focused on
[3:29:12]
makin sur that I an
[3:29:14]
orzation wanted t ctinue
[3:29:15]
to operate that faith b
[3:29:18]
faci, tha standds
[3:29:19]
were fble ehhat they
[3:29:21]
can continue to operateheir
[3:29:23]
placef wor, also
[3:29:25]
prov se affble hou
[3:29:27]
se. So we factoredhat
[3:29:29]
into looking at lot cerage.
[3:29:31]
Um, and based t bonus for
[3:29:33]
t covage on the l
[3:29:34]
coverage allow for thataith
[3:29:38]
based facilitye of the
[3:29:41]
othe standar tha w wld
[3:29:44]
ose toive the types of
[3:29:46]
lopments are exempting them
[3:29:48]
all fm design review. Um,
[3:29:49]
think it s impornt note
[3:29:50]
th l dsity zonon
[3:29:52]
requ dign revie today.
[3:29:54]
So, um, when weook at the
[3:29:55]
site acrs theity, it
[3:29:56]
not
[3:29:57]
exempting manyiteshat
[3:29:59]
wouldn t alrea be inheren
[3:30:01]
emptm design riew. But
[3:30:02]
these typ ofevelopments
[3:30:04]
wod be, u alsemoving
[3:30:06]
wher itsts,ny mum
[3:30:08]
density. So a limit o units
[3:30:11]
pe acre, um, a floorrea
[3:30:13]
ratio standar. I knowncil
[3:30:14]
gotten a lot feedbac
[3:30:14]
from lot hsing
[3:30:16]
devepers tt are florea
[3:30:17]
tio standar can be qte
[3:30:19]
restricte. So removin that
[3:30:20]
forhese types
[3:30:22]
developmen I aeadyalked
[3:30:23]
atle b abo flexible lot
[3:30:25]
coverage. W aoroposed in
[3:30:27]
the dra ce beinge
[3:30:29]
flexible about ruired yards
[3:30:32]
or setcks. Um, and the also
[3:30:34]
allowingor the plaing
[3:30:35]
buildingirectoropprove
[3:30:38]
mino deviations fhe cod
[3:30:40]
Um, so wee heard fmhe
[3:30:41]
fordable housing developnt
[3:30:43]
communit that proje oft
[3:30:45]
need to vary jus aittle bit
[3:30:46]
om zing staards. It
[3:30:48]
rd to wte zoning standards
[3:30:49]
thater every situation a
[3:30:52]
um, in the spirifing
[3:30:54]
to pde streaml pat
[3:30:56]
for tsejects to happen,
[3:30:59]
um, we did intoheode,
[3:31:00]
uh, an allance f
[3:31:01]
planningnd blding directo
[3:31:03]
to ainistrativel appve
[3:31:05]
soinoriations, um, if
[3:31:07]
ones needeo make proje
[3:31:11]
work. So t what I
[3:31:12]
gone
[3:31:13]
ov so far I kin of like the
[3:31:15]
baseust we wouldive
[3:31:16]
thesypes of dopments
[3:31:17]
that areroviding aigh
[3:31:19]
amount offfordabl houng
[3:31:21]
units.Nd thet two sdes
[3:31:23]
are sort of add ins thattaff
[3:31:26]
proposi. And the first is
[3:31:27]
a first I anitionalght
[3:31:29]
nus. And so I theraft code
[3:31:29]
that you
[3:31:30]
ven, w
[3:31:31]
ve offed
[3:31:33]
andditional heigh bonus.
[3:31:35]
A development ces t
[3:31:37]
pridee tnhat,han
[3:31:38]
th standar thateered.
[3:31:41]
Moren 20% ofheir units
[3:31:44]
at 50% Ami, ororehan 5 of
[3:31:47]
th unitst0%mi.F ty
[3:31:49]
did tt, um, they w b
[3:31:51]
able to get someitional
[3:31:52]
ight. So up aaximum of
[3:31:54]
50ft in lowsity z
[3:31:56]
up to maxim of 60f and
[3:31:59]
medium density zones, and then
[3:32:01]
up to a 25 ft bonusnd oth
[3:32:04]
zone Um, n that these
[3:32:06]
extr heights doe wit
[3:32:07]
additionetback requireme
[3:32:09]
writ int theode, so the
[3:32:11]
high they got abohat kin
[3:32:12]
of base bon, t morehose
[3:32:13]
builngs w he to b
[3:32:14]
steppedk a littl to
[3:32:16]
gate imp t adjacen
[3:32:18]
operties. In terms of how
[3:32:20]
is would work, um, we are
[3:32:23]
still, um, draing this into
[3:32:25]
our fin prosal, bt
[3:32:26]
affs think is t wt
[3:32:29]
would do is require, u do
[3:32:30]
set percentage of additio
[3:32:31]
units that wouldave t be
[3:32:33]
prov aevelopme t
[3:32:35]
begible forhis aitional
[3:32:39]
height bonus. Thether opt
[3:32:41]
that sffs pposingn t
[3:32:43]
cos providingxchange
[3:32:44]
o t would allow
[3:32:47]
deveent t ge u
[3:32:49]
differen Aevelsheir
[3:32:52]
project, wer they choseo
[3:32:54]
do a varty or aange of
[3:32:55]
itsithinneroject, o
[3:32:58]
provid all tm at 40%mi
[3:33:00]
instea of 50%mi, weted
[3:33:02]
provide an ehangeatio to
[3:33:03]
give the more flexibity to
[3:33:05]
make a project work or mt
[3:33:07]
nes or prences of the
[3:33:08]
faith bed orgationhat
[3:33:08]
ey
[3:33:10]
workingith. Um, this
[3:33:12]
ould be ailiarcept t
[3:33:13]
council. Youave aed
[3:33:14]
change ratios for several
[3:33:16]
ot affore hou
[3:33:17]
reementscross t city,
[3:33:19]
incling in the sta are
[3:33:22]
d through theuanita car
[3:33:23]
More recen a se
[3:33:24]
re
[3:33:26]
proposg thathat s
[3:33:28]
cot b app for this
[3:33:29]
affoable houngnaith
[3:33:31]
basedroperty te o
[3:33:36]
velopment. And lastl in
[3:33:38]
adtion t theode, staff has
[3:33:39]
been contempng what
[3:33:41]
r suppo serceseyond
[3:33:42]
e codemendment could be
[3:33:43]
hefulo fased
[3:33:45]
organitions underta this
[3:33:47]
ofevelopment.M, our
[3:33:48]
easor that that don
[3:33:49]
ed to b codified. There
[3:33:50]
sothing that could
[3:33:52]
progatically impment our
[3:33:54]
offeringreeubmittal
[3:33:55]
conferen and perhaps
[3:33:57]
expedid perteview. Um,
[3:33:58]
d the as I moned, we
[3:34:00]
been coording v csely
[3:34:02]
with arc a um,y have
[3:34:03]
lotfupport available to
[3:34:05]
the faithased organizatio
[3:34:06]
in terms oupportin due
[3:34:07]
ligence,ping with
[3:34:09]
feasility studies, andlso
[3:34:10]
kif concting people wh
[3:34:12]
networ tha might help the
[3:34:14]
izeoals ifhey want to
[3:34:17]
do somet likehis. Wit
[3:34:19]
that,m, with the feedback we
[3:34:20]
geonight, u we wil
[3:34:22]
finalize those draft cod
[3:34:23]
amendmen. We re curntly
[3:34:24]
scheduled to takehemo
[3:34:25]
ningommissionor a
[3:34:27]
blic hng AUGUST 2
[3:34:29]
And tight. Would loveome
[3:34:31]
feed from council on any of
[3:34:33]
the bonus dopment
[3:34:34]
stdards, a a any
[3:34:35]
spec guidanc o the
[3:34:37]
concep o the aitional
[3:34:38]
height bon the psed
[3:34:40]
exange rs. Andith t
[3:34:41]
I will h it back tou,
[3:34:41]
MADAM.
[3:34:44]
Mayor
[3:34:45]
Than you Allison,ou did a
[3:34:47]
great job So all rig,
[3:34:48]
Council, any a questions,
[3:34:50]
ents,ponse t the
[3:34:58]
questis. Councilmaold
[3:35:00]
Uh, tnk y mayor And tha
[3:35:03]
you,li, for the preseation.
[3:35:05]
It youuys are gd a
[3:35:06]
esenting uh, someery
[3:35:09]
compleics very
[3:35:10]
ealy. I w toake sure
[3:35:11]
understand some ts that I
[3:35:15]
confuse a Um, w
[3:35:18]
firstead theo.M,n
[3:35:19]
you
[3:35:19]
re talking about the
[3:35:21]
change ratio tha
[3:35:24]
parate from an indendent
[3:35:26]
om the additiona ht
[3:35:27]
s forferent
[3:35:28]
affordabity,hat
[3:35:29]
sust
[3:35:29]
someg tha you
[3:35:30]
re allowin
[3:35:34]
to change., uh, t mix of,
[3:35:36]
um, affble hou within
[3:35:38]
the develnt. And it w
[3:35:39]
those offer no additnal
[3:35:41]
ights. Is that. I that
[3:35:42]
coect?
[3:35:44]
Thk y Oppnity to
[3:35:46]
ify.Ncilmemb Aold.
[3:35:47]
Um, it
[3:35:48]
wrien the code
[3:35:49]
thatas attd inour
[3:35:51]
et, those exchange ratios
[3:35:53]
wereritten in as an option
[3:35:54]
for additnal units.
[3:35:57]
Wou be requid for the
[3:35:59]
ditional height bus. Um,
[3:36:01]
since w plished your packet,
[3:36:03]
staff um, evoing that
[3:36:05]
idea to potentially apply to
[3:36:06]
all of the afforble uts
[3:36:07]
quired.Ohat
[3:36:08]
s w we
[3:36:09]
wouldpose is making tho
[3:36:11]
change ratio aable
[3:36:12]
acro therd, and would
[3:36:13]
apprte council feedbk
[3:36:13]
That.
[3:36:17]
Yep, supportt. U o the
[3:36:18]
additial ht bonus, t
[3:36:19]
an a where I did
[3:36:20]
tly
[3:36:22]
rstand. Have you set a
[3:36:24]
standa of whato to
[3:36:26]
alify fhe addnal
[3:36:28]
ightonus,r areou aing
[3:36:30]
r feedb onnhe con
[3:36:33]
and the u limits?
[3:36:34]
Thou forhe qstion. We
[3:36:36]
arooking feedbac o the
[3:36:37]
conc We
[3:36:38]
ve been workingn.
[3:36:39]
On of t pnts w
[3:36:40]
re sll
[3:36:41]
coordinang on with arche
[3:36:42]
calibrat with that
[3:36:44]
requirt be. Um.Urrent
[3:36:45]
thought ist weould do
[3:36:47]
something liken additional
[3:36:49]
affordae uni mig me
[3:36:50]
you elible forhat
[3:36:51]
ditional hei bus if
[3:36:52]
there
[3:36:53]
s anyer limits that
[3:36:54]
counci membeeel sgly
[3:36:54]
about, we
[3:36:56]
b hearinghat.
[3:36:59]
, great. So to I appree
[3:37:02]
that the ars. S um, o
[3:37:05]
my feedback overam, I
[3:37:07]
ally aciate the mod
[3:37:10]
equivcies ver
[3:37:11]
coming up wit som new
[3:37:12]
standand sfying this
[3:37:14]
uch simpler to understan
[3:37:16]
I appreet. I appreci
[3:37:18]
e focus o delopmenty
[3:37:19]
righ a t administre
[3:37:22]
provals. Um, I sporthat
[3:37:24]
you re suggeing on, uh,
[3:37:25]
allowi for thexchange
[3:37:29]
rati, um, throu,h,s
[3:37:31]
partf afforeousing.
[3:37:34]
And I support uh, andot
[3:37:37]
necessaril justart of a
[3:37:40]
ight bonus. And, um, I
[3:37:43]
suort theer limits of t
[3:37:44]
ight bones thatou
[3:37:46]
estingnd look frd t
[3:37:49]
rther dision from the
[3:37:51]
anningommissio onhatre
[3:37:53]
the rhtnd arch ohat are
[3:37:56]
e right, um, requirement to
[3:37:59]
alify tt?Hank you.
[3:38:00]
Thank you. Couilmemberim
[3:38:01]
Chisholm
[3:38:04]
Thank ynd tha you,
[3:38:07]
Aln. Um wheren t
[3:38:10]
proc a we on t? And
[3:38:13]
es thi was desigd
[3:38:14]
comply with the s law, b
[3:38:15]
does thi go back tohe
[3:38:17]
Planningmission now?
[3:38:19]
Yes. Sour next ste w be
[3:38:20]
inalize t draft cod
[3:38:22]
amendmentsnd t te ito
[3:38:23]
Planning Commissn for a
[3:38:25]
puic heari
[3:38:30]
Okay. Um, thank you. Io, um
[3:38:32]
agre with andport m of
[3:38:36]
this I tnk it is logical
[3:38:38]
because this wou take I
[3:38:40]
considern the unding
[3:38:45]
zoning o t surunding, um,
[3:38:46]
neighbor or the surrounding
[3:38:48]
loon. R?
[3:38:49]
Yes.
[3:38:52]
Thank.
[3:38:58]
Thank you Anydy else?H,
[3:38:59]
Council. R.
[3:39:01]
K you, MADAM Mayor. Um,
[3:39:02]
nothing really newo. I just
[3:39:05]
wanted to share that I support
[3:39:05]
staff
[3:39:08]
sommendatn. U and
[3:39:10]
including thexchangeatios
[3:39:12]
plying to t all of the
[3:39:13]
affoable housing
[3:39:15]
reements. And I reall
[3:39:16]
appreciate n only its
[3:39:17]
sicity, butts
[3:39:19]
responness to the um, t
[3:39:21]
stakehoer engent. So
[3:39:22]
thank for that. I
[3:39:24]
lookg frd to hoply
[3:39:26]
adopti t in tear
[3:39:28]
futu Thank
[3:39:30]
Thank you. Cilmember Prem.
[3:39:33]
Hi.Ust wd say tha I
[3:39:34]
ag with, u the oll
[3:39:36]
plan here and don
[3:39:37]
t h really
[3:39:39]
anytng to add, w. Is
[3:39:40]
h is rare.
[3:39:42]
Thank you. Thank you.
[3:39:47]
Yone els? All right Um,
[3:39:49]
same. I thi this this is
[3:39:51]
really well done. Think that
[3:39:51]
we
[3:39:53]
worked really hard t
[3:39:54]
lify therocess as m a
[3:39:56]
ssible, bot in t zoning
[3:39:58]
and, u being able to handhol
[3:40:00]
andupport the f bas
[3:40:02]
proper. U this is very
[3:40:05]
thoughtfulm,eah. It
[3:40:07]
great. Tak to public
[3:40:09]
hearing. O I d hav o
[3:40:11]
estion. Appciate tha y
[3:40:12]
brought the faith based
[3:40:14]
proptywnersn t get their
[3:40:18]
feedck. Did we dhat
[3:40:20]
incle thi c Did they
[3:40:22]
look at thi code, reczing
[3:40:22]
it
[3:40:24]
s not usual the
[3:40:24]
don
[3:40:26]
t rode? Usu.
[3:40:27]
Did theye ahance
[3:40:29]
provideeedback the code?
[3:40:32]
t belie thatnyaith
[3:40:33]
based organation feek
[3:40:35]
directn theode.Hat
[3:40:35]
we
[3:40:36]
ve heard af is that
[3:40:37]
thon
[3:40:37]
t don
[3:40:38]
t do this
[3:40:38]
d they
[3:40:39]
ot ser familr,
[3:40:40]
te feele we
[3:40:41]
ve gotten
[3:40:42]
really cructiveeedback
[3:40:43]
fromffordabl housing
[3:40:45]
deloperstoulde likely
[3:40:46]
partners.
[3:40:47]
Okay.
[3:40:50]
And I wn we but let
[3:40:51]
do
[3:40:53]
in them to participate in
[3:40:54]
e publicearing. So thank
[3:40:58]
you,eputy Mayor.
[3:41:01]
Ink y, MADAM Mayor Um,
[3:41:03]
kindf reledo tha
[3:41:06]
lison. Um, makin suret
[3:41:06]
we
[3:41:08]
I, I was goingo ask the
[3:41:09]
same qstion thathat cil
[3:41:11]
mberrnoldsked abouthe
[3:41:13]
sort of tathematil bridge
[3:41:15]
beeenhe, um, additl
[3:41:17]
affoableousing uni
[3:41:18]
uant to t ratior
[3:41:21]
otherw additional
[3:41:24]
he, uh,onus. So whent
[3:41:24]
sounds l we
[3:41:25]
going be
[3:41:28]
refini that, ahen w do,
[3:41:29]
um, Ihink itld me s
[3:41:29]
we hav
[3:41:30]
t alr, to
[3:41:32]
feedrom the developme
[3:41:34]
commity that does aordable
[3:41:35]
hous develment and make
[3:41:36]
re that wha we
[3:41:37]
re ting
[3:41:39]
ab mesense.Of w
[3:41:39]
re
[3:41:41]
t doing that, let s I sst
[3:41:42]
do. If
[3:41:42]
re if
[3:41:43]
re
[3:41:45]
alreadoing it,at. U
[3:41:45]
obviousl we
[3:41:46]
got se wor
[3:41:47]
to do to figure outt
[3:41:48]
mathemat be, and I j
[3:41:49]
want to m sure ites
[3:41:52]
se a tt, you know, 1
[3:41:54]
additi feeesense and
[3:41:55]
20 aional feeakesse
[3:41:57]
becausometimes wee u
[3:41:58]
wihose numrs, least
[3:41:59]
as ectedfficialso.
[3:42:01]
Prly not you as planning
[3:42:03]
professis. A once
[3:42:04]
deper getshold of tho
[3:42:05]
numbers, they
[3:42:06]
re like, hmm,
[3:42:06]
at doesn
[3:42:07]
t reall do that
[3:42:08]
much f So wanto make
[3:42:11]
we tnkt tough.
[3:42:13]
Ye And Scott hiseam do
[3:42:14]
have a very direct lin of
[3:42:15]
commicationn thisroject
[3:42:17]
with the Housi Develnt
[3:42:18]
Coortium, who rsents
[3:42:19]
several affble housi
[3:42:20]
developers Sohink they
[3:42:22]
en great at providi
[3:42:23]
feck and givin usd
[3:42:25]
checks as we g ang.
[3:42:25]
Grt.
[3:42:27]
Thankou.
[3:42:30]
Thank you. Anyon else? All
[3:42:31]
ght. Allon, do y feel
[3:42:31]
likeou have w you need
[3:42:32]
from us?
[3:42:34]
Believe we have w we need.
[3:42:35]
Than you for theeedback.
[3:42:36]
Great. Thaso.
[3:42:37]
Much.
[3:42:39]
Allight. A g to move
[3:42:42]
o, uriefing on
[3:42:43]
pontialffordabl houng
[3:42:45]
agreemen relatedo the
[3:42:49]
apartment. Cyager.
[3:42:51]
Okay. Thank you, m MAY.
[3:42:53]
Um, ts I a potential
[3:42:55]
prt. Uh, to ce se
[3:42:56]
fordable housi I Kirkl
[3:42:56]
at
[3:42:57]
been going for
[3:42:58]
severalrs. And w finly
[3:43:00]
ha toce t Weant
[3:43:01]
checkn with couil
[3:43:02]
see if yant u toontinue
[3:43:05]
to a fingreement. So, uh,
[3:43:06]
we hdamnstein, our
[3:43:07]
dictor of plag a
[3:43:08]
ding, I going tivehe
[3:43:10]
entatione alsoe
[3:43:11]
owner t project, rta
[3:43:13]
apartmen,ert Patto is
[3:43:15]
re,s well as Angela Rman.
[3:43:15]
Um, a the
[3:43:16]
re her tonswer
[3:43:18]
quesonsbout the pro and
[3:43:19]
the agrnt as w So with
[3:43:19]
that,
[3:43:21]
ll tn it ove to MR.
[3:43:22]
Weinstei
[3:43:23]
All right
[3:43:25]
, goodvening.Hanks, c
[3:43:26]
manage Goo evening mayor.
[3:43:28]
Goodning, deputy mayor and
[3:43:30]
coun u as tity
[3:43:31]
mana menoned.H,oined
[3:43:34]
byeral folks um, Don
[3:43:35]
Nelson, our planning maner,
[3:43:37]
Kevin Han our senior
[3:43:38]
sistant city attory w
[3:43:40]
helped o with this, u
[3:43:42]
anis.Hennor
[3:43:43]
Hansen theanaging priipal
[3:43:45]
at srm developme Aa
[3:43:46]
Roan, who
[3:43:47]
s tirector o
[3:43:48]
sustainabl devopment at
[3:43:50]
Natu and Buildironment
[3:43:51]
And then, cours Rober
[3:43:51]
Pannel who
[3:43:52]
s the CEOf
[3:43:54]
Nal andlt Environment
[3:43:55]
yeah, again, we
[3:43:55]
not
[3:43:56]
lookin for aecision tht.
[3:43:58]
Feedbk on whether you
[3:43:59]
want staffontinue working
[3:44:01]
this agree And ifou
[3:44:03]
have a flow uuestions.
[3:44:04]
Um, and yeah, a,ust s
[3:44:07]
slides tonig. Hoply you
[3:44:09]
can s an aer photoere.
[3:44:12]
Umhisseallyt t
[3:44:14]
prov some context.M,nd
[3:44:15]
you knohis I I sd
[3:44:16]
mention, t is aeally
[3:44:18]
exrdinary project
[3:44:18]
that
[3:44:20]
been instrumen in
[3:44:21]
ing par ofur adable
[3:44:23]
housing strateg And Kirand.
[3:44:24]
So It wt tont that
[3:44:26]
out. Um,ur its a 290 ut
[3:44:28]
aparentlding.S you all
[3:44:28]
know it
[3:44:28]
s r in t heart
[3:44:30]
of dntown. Um, I
[3:44:31]
also note
[3:44:31]
it
[3:44:33]
right n to t11
[3:44:35]
Un Plaza project. Andn
[3:44:37]
respon tonarlier public
[3:44:39]
commt, the Pza proctas
[3:44:40]
th project tt was
[3:44:42]
subject o an mft agreement
[3:44:44]
at was city negiated. Um,
[3:44:46]
not the right um, pject tha
[3:44:46]
we
[3:44:47]
re talng about tonight
[3:44:49]
So againht in the middl
[3:44:50]
of downtown, right across fro
[3:44:52]
rkland Urban,ugely
[3:44:54]
walkable, tworocery ss
[3:44:55]
wi a cple ofute walk.
[3:44:57]
, I think, youw, a
[3:44:58]
th charactistics ofhe
[3:45:00]
setting o the90 uts at
[3:45:03]
rt 228 utsre eco fla,
[3:45:04]
meaning tha theyave share
[3:45:06]
kitchelthough mos have
[3:45:08]
thr own batms. T
[3:45:09]
proposed dea t we
[3:45:09]
re
[3:45:11]
lking aboutonightould
[3:45:12]
encomps affordabili
[3:45:15]
restriions at 60%f the area
[3:45:18]
median incom Or am I on 218
[3:45:21]
ofhe eco fla uni or 7
[3:45:23]
of total uni And just to
[3:45:25]
ovide iustration of wha
[3:45:27]
60% a meanur communi
[3:45:28]
it
[3:45:30]
s abo $66 per year f
[3:45:32]
househo of one. So we
[3:45:32]
re
[3:45:33]
ing abo,ou know, pretty
[3:45:35]
critical empes o
[3:45:37]
coity. So we re talng
[3:45:38]
aboutostalmployees,
[3:45:40]
exive atants, prehool
[3:45:41]
teac, entry levelransit
[3:45:44]
woerst,m, needo have
[3:45:45]
housingt
[3:45:45]
s affordabl at
[3:45:49]
60%. Ami sohis I thelide.
[3:45:49]
Ve sn this, I don
[3:45:50]
t know,
[3:45:51]
50 or 60 tim ove thet
[3:45:53]
couple years It shows our
[3:45:56]
ing nds through 20,4,
[3:45:58]
13,200 utsoss all iome
[3:45:59]
vels.
[3:46:00]
ll justoint out aouple of
[3:46:03]
thingsirst, as youll kw,
[3:46:06]
the greest nee um, basedn
[3:46:08]
this crt, is t 50% and
[3:46:09]
unr range, and that
[3:46:09]
s about
[3:46:13]
10,440 units, o abo0% o
[3:46:15]
our need. Um, the needn t
[3:46:17]
51 to 80% ran is still is
[3:46:18]
mu small, b it
[3:46:18]
s still
[3:46:19]
ryt
[3:46:22]
s about2 uni, or
[3:46:26]
of our our overall need. A
[3:46:28]
this1% t 8ge is
[3:46:30]
bracketfncome nee tha
[3:46:31]
would beddressedhis
[3:46:33]
proposedld. So again, a
[3:46:34]
really important par ofur,
[3:46:36]
, aordable hsingtrategy.
[3:46:39]
Just as a remin herere
[3:46:40]
the keyments ofhe
[3:46:44]
proposalm, again, 218f the
[3:46:46]
ho Flats at r2, iding all
[3:46:47]
of the uni withhared
[3:46:49]
rooms,lde set asi
[3:46:53]
60% ami. Um, tenturnover
[3:46:55]
has been an interest um of
[3:46:57]
council on previousgreements.
[3:46:59]
Rightow,ccording to the
[3:47:01]
owner, aority of t units
[3:47:02]
are ren byenants who
[3:47:05]
incos or 60%.Nd
[3:47:07]
under the terms ofhe dea
[3:47:08]
theseenantsld stay a r2
[3:47:11]
t MAY b reled to um non
[3:47:13]
inme restricte uni in
[3:47:15]
ilding. U regding ince
[3:47:17]
owth, if a ten makore
[3:47:19]
an 60%, I aenant whoes
[3:47:22]
no m tha 60%miovesnto
[3:47:23]
unit, andhen tir inc
[3:47:26]
eases u to0% a the
[3:47:28]
unould se consid
[3:47:31]
fordable. Um, rding t
[3:47:32]
eligibity for the t
[3:47:34]
exion, the propey owner
[3:47:35]
ts the tax breor at lea
[3:47:39]
20 40 yea.Gs 75%
[3:47:40]
of the uts are rente to
[3:47:42]
households, makg no more tn
[3:47:45]
60%. Ami With t limed
[3:47:46]
come gh psion tha I
[3:47:49]
just td aut, um, as I
[3:47:52]
previously mentied, um,y
[3:47:53]
would bligible for tax
[3:47:56]
exemptio Um, rardinghe
[3:47:58]
an, be eligibl for t
[3:48:00]
reak, besideseeting the
[3:48:02]
fordability rrements, the
[3:48:03]
prt has to receive
[3:48:06]
final, uh,ublic fancial
[3:48:07]
asanceer the sta law.
[3:48:08]
That
[3:48:09]
srehe city com
[3:48:11]
in. S t propol is to g
[3:48:13]
the own a $500,00 no
[3:48:15]
intest lor upo0
[3:48:17]
years. Um, andhenhe
[3:48:19]
nitoring pla would have
[3:48:20]
t I proces f
[3:48:22]
ensuring the afforbility
[3:48:24]
ovisions of the agreent are
[3:48:25]
met. And those would also
[3:48:27]
likely be monited by our
[3:48:29]
collest arch.M,nd
[3:48:30]
then the last thing I want
[3:48:31]
mention abouthe keyments
[3:48:33]
of the pposal isthe
[3:48:34]
project wou be owned a
[3:48:37]
operatedy a nonfit.Hat
[3:48:38]
non-prit is still to be
[3:48:40]
dermined. Um, the current
[3:48:41]
owner h a listf
[3:48:42]
organisatiy wl
[3:48:43]
ntially negte with if
[3:48:48]
e deales forward.
[3:48:50]
This sli, um, we put together
[3:48:52]
in respons t quest about
[3:48:53]
e,m,het of the
[3:48:55]
plicatio of the tax bak.
[3:48:57]
Um, so I jt wanto menon
[3:48:59]
twohings about the sli.
[3:49:00]
Firss tha the owner, t
[3:49:02]
current owner o the proct,
[3:49:04]
estimatehe val the tax
[3:49:08]
break atut 500,502,000
[3:49:10]
per year. Um, and then t
[3:49:11]
haven lotsf questio
[3:49:12]
abouthe impt to city home
[3:49:15]
of taxak. So usingur
[3:49:17]
internl,ur finance
[3:49:19]
depamenttaff eated that
[3:49:21]
thity propert taxes t
[3:49:23]
uld be shiftedo the owner
[3:49:25]
of media v home in
[3:49:26]
Kirkla as a resul o the t
[3:49:28]
brft wer toe
[3:49:30]
proved, would be about $1.25
[3:49:31]
a year.Nd tt
[3:49:32]
sin for a
[3:49:34]
median val homen Kkland.
[3:49:35]
I would a note,hough,hat
[3:49:36]
that fure does not ide
[3:49:38]
shifted t, a oth tax
[3:49:39]
stricts. We
[3:49:39]
relly jus
[3:49:40]
ing abo the shifted
[3:49:43]
tas. Um,or cit proy
[3:49:47]
tax.Nd then this is the last
[3:49:49]
slide. These are the is for
[3:49:51]
counl cderation tha we
[3:49:52]
flagd in the staff mem I
[3:49:52]
ll
[3:49:53]
go throughm relively
[3:49:55]
fast. But you re welco tosk
[3:49:58]
quess aut t Um, first
[3:50:00]
is rdingome limits. U
[3:50:03]
so the proje without the
[3:50:05]
oject, without any covent
[3:50:07]
in pla Um, jus you kno
[3:50:09]
ma reents already has
[3:50:10]
very hig dreef
[3:50:12]
affordabil wh9% o the
[3:50:14]
ecolats, rting f l
[3:50:17]
than 6. I
[3:50:18]
d also note
[3:50:19]
e afforbilitynder this
[3:50:21]
al w bey t regn
[3:50:23]
widets for studi uts,
[3:50:24]
ich inany cases have
[3:50:26]
cote kitchens a in u
[3:50:28]
rooms. Ando ine ways
[3:50:30]
be superior tohesenits.
[3:50:31]
So a key questio
[3:50:33]
whether it is likely for rents
[3:50:34]
to ince or decreasn
[3:50:36]
these uts over time, a the
[3:50:37]
ether adability level
[3:50:39]
should be linked toomething
[3:50:40]
le thantudio units. Aga
[3:50:41]
these aret queions that
[3:50:44]
we re posin Um, uypes.
[3:50:47]
Um the agrment incdes only
[3:50:48]
eco flats and not 1 to
[3:50:49]
bedroo uts.Nd we
[3:50:50]
know
[3:50:52]
that t bomts,
[3:50:53]
ich aresent in r2,
[3:50:55]
particlyhe two and three
[3:50:57]
bedr uts, m behe mos
[3:50:58]
desiblenits and the os
[3:51:00]
at are mtely t under
[3:51:02]
futuent escalatn. Um,
[3:51:03]
although t might be a
[3:51:04]
of value in preservin the e
[3:51:06]
flat as well. Um, at
[3:51:07]
afable levels. Sohe
[3:51:08]
question is,houldny of the
[3:51:10]
reousehold size unie
[3:51:11]
includ I the m undhe
[3:51:14]
reement? Uent increas
[3:51:15]
nother issue that we
[3:51:19]
flged. U so y probly
[3:51:20]
ow that tse uniouldot
[3:51:22]
be sjecto the receny
[3:51:23]
passed s authori r
[3:51:25]
cont. And so they would
[3:51:27]
tuate accngo changes
[3:51:29]
an area medianncome.
[3:51:31]
Right. T, lked to am I
[3:51:33]
milarother ah managed
[3:51:35]
unit inhe cit Shat
[3:51:37]
happens is that if median
[3:51:39]
inmees at ater r
[3:51:39]
thn indidual
[3:51:41]
sncome,
[3:51:42]
that individiving unit
[3:51:44]
then becom lessffordabl
[3:51:45]
, and again so we
[3:51:45]
re tng
[3:51:47]
abouts iue I ter of
[3:51:48]
individu experieeersus
[3:51:49]
gregatexperienc And so
[3:51:51]
the queion ishould theree
[3:51:53]
a capn, u rent incases to
[3:51:55]
reflect, you k poten
[3:51:56]
calationf mediancome in
[3:51:59]
th region?Hen las
[3:52:00]
t loan a the tms o
[3:52:01]
the agreeme So we
[3:52:02]
re talking
[3:52:04]
ag about a $50000 loant
[3:52:07]
0% interes u f a term
[3:52:08]
of u to 40ears. A I see
[3:52:09]
that Couil mr Jim
[3:52:10]
Chisho hasisand u as
[3:52:12]
well.
[3:52:14]
Councilmr Chiolm.
[3:52:18]
, thaou, Adam.M,o my
[3:52:19]
question is on the terms of the
[3:52:21]
an, Inderstand the v o
[3:52:22]
this proct, and I
[3:52:23]
merally
[3:52:26]
pportive. T loanerms a
[3:52:28]
0% interest. And my question
[3:52:33]
for sta is, younow, why
[3:52:33]
isn
[3:52:34]
ts loa at 6%nterest
[3:52:38]
or thevailing rate, u
[3:52:40]
whever aormal loan would b
[3:52:42]
at from Fane Mae or Fredd
[3:52:44]
Mac the feral governmt.
[3:52:45]
And I w ne t 20 years
[3:52:47]
oferest 4ears o
[3:52:52]
terest 6% woulde MAY
[3:52:54]
000/20 yrs, o I the
[3:52:56]
loan is over 40 y, you
[3:53:02]
, 800,000 or more. And why
[3:53:04]
are we fing that, that
[3:53:05]
interet som sort of a
[3:53:08]
reasonabate
[3:53:09]
I see the cit has hisand.
[3:53:12]
Up. Gohead.
[3:53:13]
I could d an itialponse
[3:53:14]
that. S that
[3:53:14]
sne of the
[3:53:15]
asonse hav the question.
[3:53:17]
Ink thentent of the staff
[3:53:18]
and the sing point was if
[3:53:20]
rerying to facilate
[3:53:21]
rdable hng, we re
[3:53:22]
trying to remove as many
[3:53:24]
iers asossible. Any
[3:53:24]
cost tha we
[3:53:26]
beosing, we
[3:53:27]
woul startaying w
[3:53:27]
shouldn
[3:53:29]
e doing that.Ut
[3:53:31]
the wn the proctas first
[3:53:33]
ought ofeveral yea a,
[3:53:35]
the intent washat themount
[3:53:35]
of mey was goi toe a
[3:53:37]
contribuon, notne. S
[3:53:38]
even tha
[3:53:38]
s betr than
[3:53:40]
think, than theriginal idea,
[3:53:41]
whh wassouldust b
[3:53:43]
of our cibutiono the
[3:53:45]
stack of funding So that
[3:53:45]
s t
[3:53:46]
th
[3:53:47]
s themary rea we
[3:53:48]
re just thig we wanted to
[3:53:49]
keep t impactsow as
[3:53:50]
ssible,uthere
[3:53:51]
stainly
[3:53:51]
noson we cou
[3:53:52]
t have a
[3:53:54]
discus withhe propey
[3:53:55]
ner abouthether t
[3:53:56]
should bn intert onhe
[3:53:58]
loan.
[3:54:01]
Um, okay. I mea I uerstand
[3:54:03]
the rns supporthis,
[3:54:07]
but,m, a I underst n
[3:54:10]
having aighr erbitantly
[3:54:13]
high ierest rat b um,
[3:54:17]
zeroeems, ccerning. A
[3:54:20]
I would I wou ask that
[3:54:22]
difft optns be bro
[3:54:24]
back at the preing rate or
[3:54:26]
that tha be investigate
[3:54:28]
Thk you
[3:54:31]
Thk
[3:54:33]
Great. Thank I d
[3:54:33]
t he
[3:54:35]
at much. Oh, sorry
[3:54:37]
, I wasoingo tell. G
[3:54:37]
ead. So. Okay.
[3:54:38]
You
[3:54:39]
good.Kay.
[3:54:40]
I was gng totion I don
[3:54:42]
ha that muche to am,
[3:54:43]
so,eah, w already sor of
[3:54:45]
gotnto ter o the loan.
[3:54:48]
Um theerm is0 y. Als
[3:54:49]
is t only otherhinghat
[3:54:49]
we
[3:54:52]
flag. U and again, the
[3:54:53]
ownericates that, younow,
[3:54:54]
the ter ofhe agrment
[3:54:55]
e necessary to se
[3:54:57]
financin t project Um,
[3:54:59]
weould note thatypically
[3:55:00]
th typical inclusion
[3:55:01]
ningts andirkland
[3:55:04]
market rat build are, um,
[3:55:05]
usuall affble the life
[3:55:06]
of t project.O wheou
[3:55:07]
thin about t term ofhe
[3:55:08]
an a the ter of the
[3:55:10]
fordabily, you mig think
[3:55:12]
ab that asl.M, and
[3:55:13]
wi that, I think that
[3:55:15]
exha thessuesorouncil
[3:55:16]
considern. We
[3:55:16]
happy to
[3:55:17]
take mor questiondgain,
[3:55:18]
we
[3:55:19]
re just lng f feek
[3:55:21]
ndertakidditionalork
[3:55:23]
on thi agree. And then
[3:55:24]
llow upuestionshat we can
[3:55:29]
rech further.
[3:55:31]
Okay. Tnk you. Dou have
[3:55:33]
anot questio
[3:55:33]
, no.
[3:55:37]
No. Oh, okay.
[3:55:38]
All rig Uh, Councilmber
[3:55:42]
Pascal.
[3:55:44]
Thank you. Uh, qion a
[3:55:48]
coup of questio Um, so
[3:55:50]
this so, I mean, MAY I
[3:55:51]
gettin thiselopment
[3:55:52]
confused withhe other one
[3:55:54]
next door. S the other o h
[3:55:56]
multifamy taxmption, and
[3:55:56]
this dn
[3:55:57]
t. Is that what.
[3:55:58]
That what
[3:55:59]
reaying?
[3:55:59]
Correct.
[3:56:05]
Yep. Okay. And tn, um, on,
[3:56:09]
u know, gue wt I, wt
[3:56:10]
what Ird f t
[3:56:13]
prtation w that,h,he
[3:56:16]
eco flats you kw, manyf
[3:56:17]
them curre rent less than
[3:56:19]
ami.T
[3:56:20]
s just tt t
[3:56:21]
ncome rictionsn
[3:56:24]
reg to folks that meet
[3:56:29]
that. Umoday.Ight.
[3:56:29]
Yeah. Tha
[3:56:31]
s rig. I t 8
[3:56:34]
nt fs than ami. And
[3:56:35]
agn, theyt those low
[3:56:36]
lels jy naturf the
[3:56:37]
fa that the
[3:56:38]
reery cct.
[3:56:39]
Um, and we
[3:56:40]
desnedor
[3:56:43]
affordabil aket rates.
[3:56:45]
What gue wha like mt
[3:56:47]
rmation w have that
[3:56:49]
that would say that
[3:56:51]
the crentents wxceed
[3:56:54]
60 a you kn theuture
[3:56:56]
is I just kin of jus me
[3:56:59]
ba of envele, uh,
[3:57:00]
calculationsr estimates ors
[3:57:02]
there, there more tre to
[3:57:03]
kif substtiate.
[3:57:04]
At?
[3:57:05]
Ye, that s sometngt w
[3:57:06]
co loo at furth. I
[3:57:08]
think have aot of hard
[3:57:09]
ta ont a thioint. Um,
[3:57:09]
it
[3:57:11]
s hard to pdict what
[3:57:12]
ppensh rents in the
[3:57:13]
ture. You kno oftentime
[3:57:13]
it
[3:57:15]
s buildinge, the ren
[3:57:18]
aper,utetimes.
[3:57:19]
Right,speciall whe there
[3:57:20]
onstrain housing sy o
[3:57:22]
a ofconomic gro the
[3:57:24]
oppote c hapn.O, u t
[3:57:25]
er youruestion,on
[3:57:26]
thine haveerfect, you
[3:57:28]
know hard data o that iss
[3:57:29]
right now. U and t
[3:57:30]
somethine couldook into
[3:57:31]
furthe
[3:57:33]
I d benterested inust a
[3:57:35]
ttle bite, uh, focus on
[3:57:37]
that. Um,
[3:57:38]
d lik to be
[3:57:41]
asd that, thatt least
[3:57:43]
gave it a good dueigence
[3:57:44]
m.
[3:57:46]
Than you.
[3:57:51]
Thou Andrew
[3:57:53]
Yeah. I was jt, was Ihink
[3:57:53]
uh we
[3:57:54]
ll definit see wha we
[3:57:56]
can fig o on tha
[3:57:58]
think. Uh certalyalkith
[3:57:59]
develop well and
[3:58:00]
othe toome insight I
[3:58:02]
ink. U pposing ts, I
[3:58:03]
was als looking at other
[3:58:06]
de ofhe coin,hichs, um,
[3:58:07]
likyreore pe t
[3:58:10]
become low incom And tha
[3:58:10]
s,
[3:58:11]
I thinkne o the challs
[3:58:12]
that we
[3:58:12]
re seeingn we h
[3:58:13]
ouiscussio o thetility
[3:58:15]
rates earlier Right. That
[3:58:15]
there
[3:58:17]
slso, uh,she nd
[3:58:18]
incrsing for dedicat
[3:58:20]
affordable houng. S I tnk
[3:58:21]
th are t twotors y
[3:58:23]
wa to wei what is what
[3:58:23]
it
[3:58:23]
likely topenith
[3:58:25]
s to is wt
[3:58:25]
sikely to
[3:58:26]
happenith the.
[3:58:36]
Ne. Councilmembrnold.
[3:58:39]
Ank you to, um,ouncilmeer
[3:58:39]
Pascal
[3:58:41]
s questio I am
[3:58:43]
woering. Um, younow, it
[3:58:46]
nott the ren of this.T
[3:58:48]
the risk oosing these
[3:58:50]
affordlenits. And I see
[3:58:52]
thate have, Rob
[3:58:54]
lty andngela Ros, of
[3:58:56]
Sustaina Kirkl h I
[3:58:58]
wonderg ifhey a able to
[3:59:01]
share, um, like, fro what they
[3:59:03]
ve had is what st
[3:59:04]
s the
[3:59:06]
rest in any aernatives
[3:59:08]
that the h hadorhis
[3:59:10]
proper that, um,o com
[3:59:12]
to,ompared to t to the
[3:59:14]
ec flatsf the
[3:59:14]
re ppared
[3:59:18]
to discuss ifot, um, uh,
[3:59:18]
th is fine..
[3:59:30]
To.
[3:59:31]
Thanobert has his hand
[3:59:36]
raised. Mayor. Ifou wand
[3:59:37]
himo respond
[3:59:38]
To tt
[3:59:40]
The MAY fzen.
[3:59:44]
, I thi she I
[3:59:45]
Okay
[3:59:46]
Depu mayor, do wanto
[3:59:48]
take oror a secd?
[3:59:51]
Sure. So, uh, Mr.Ley.
[3:59:53]
Um, thank you very muc
[3:59:55]
unl. Um, a I would lik
[3:59:58]
to giveomeesnse to the
[4:00:00]
the comment aea,ecse
[4:00:02]
we all want affordality and
[4:00:04]
we wan theest afforbility
[4:00:06]
thate can occur At
[4:00:09]
stards whole pro was
[4:00:11]
ent to selhe propert
[4:00:15]
Um, w got multiple oers.
[4:00:17]
, at whichnd it h
[4:00:19]
continueverhe lt couple
[4:00:22]
of years.M,he peopl wan
[4:00:24]
do value a this
[4:00:26]
prer and their job to d
[4:00:28]
value add isos toush
[4:00:31]
res out. Andersonally, it
[4:00:32]
ared me dea becau
[4:00:33]
that
[4:00:34]
s noteen ourison.
[4:00:36]
And when we first built thi
[4:00:38]
e presint o t of the
[4:00:40]
ba tha gav u the
[4:00:42]
cotruction fanci, he
[4:00:44]
said, y knoe lot bette
[4:00:45]
if you jus build all the
[4:00:49]
luxuri Um,conomiy. And
[4:00:50]
becae they did a l of thi
[4:00:53]
and I sai know that, but
[4:00:53]
th
[4:00:55]
noturison. So o
[4:00:57]
goal he is to maintain the
[4:01:00]
min. And I m what hapned
[4:01:03]
when weuilt rt,he ama s
[4:01:05]
eyes we up here and a of
[4:01:07]
ouren wereelow.Nd
[4:01:07]
at
[4:01:10]
s hpened has we
[4:01:10]
ve
[4:01:11]
oken thrgh. We
[4:01:12]
ve de the
[4:01:14]
art of aroover, andhe
[4:01:17]
ossoveeanshat the ren
[4:01:20]
are iasing.He c
[4:01:22]
prsures unbelievae.H,
[4:01:25]
omnsurance to realstat
[4:01:27]
taxe t wages and the ren
[4:01:30]
ha pusd a beg to ph
[4:01:35]
erhe Ami 60%. A the uh,
[4:01:35]
so that
[4:01:37]
s wt mivated this.
[4:01:38]
Um, I
[4:01:40]
miguruthat I
[4:01:42]
not getting any younger, a my
[4:01:43]
ctorays
[4:01:45]
m biologicall
[4:01:46]
ten yearsounger tha my
[4:01:47]
chrocal age, and still
[4:01:48]
chked. I
[4:01:48]
m slletting
[4:01:50]
olr. And so we
[4:01:51]
re
[4:01:54]
mong to, t to make a sale.
[4:01:56]
D w believe the best thing
[4:01:57]
the c door our city I
[4:01:59]
put on aovenant.Hat
[4:02:02]
said, we havenderlyin uh,
[4:02:05]
um, lns thae have to
[4:02:06]
ap for. Anything we
[4:02:09]
ed toas tochievee
[4:02:11]
approval orill ben
[4:02:12]
loan dault. At
[4:02:14]
s ver
[4:02:14]
we
[4:02:15]
veon lotf homework
[4:02:16]
andehink we
[4:02:17]
hden
[4:02:19]
theightirection b its
[4:02:21]
oing cllen. I
[4:02:22]
ve
[4:02:24]
neve seen the fanciarke
[4:02:26]
so chaengi in caree a
[4:02:28]
aight n. And I based
[4:02:30]
on theeral l, I
[4:02:31]
mot
[4:02:31]
coident
[4:02:32]
s n gng t
[4:02:34]
ntinue.O I think we
[4:02:34]
re I
[4:02:36]
r a r a lg road he.
[4:02:39]
Theoal, th, is why?Hy
[4:02:41]
do we also thihat rents
[4:02:45]
wi increas Wel sce 20
[4:02:47]
from 20 to2, I theity
[4:02:50]
Kirklanncreasingncomes
[4:02:53]
ineased 1%. Rents have
[4:02:57]
increased 165 thest
[4:03:00]
hit are ourest incomes So
[4:03:03]
I wou hop that we wld,ou
[4:03:05]
ow,eallyo sethi
[4:03:06]
speclo ptectur ler
[4:03:08]
comehe ohing tha
[4:03:10]
th covenant ds, t b car,
[4:03:11]
an I thinkt was brief
[4:03:14]
mened,m,y Cncilmemb
[4:03:17]
Pascal, but right n a I
[4:03:19]
think,m, uh, tnning
[4:03:21]
ctor alsod it rig
[4:03:23]
now, uh, slightlr half o
[4:03:25]
our units are rented b people
[4:03:28]
over 60%. W this tition
[4:03:31]
willo isetverybody I the
[4:03:34]
50% t b abl tent insad
[4:03:37]
of some o ourolak 1,
[4:03:39]
120,000. Tyikeheni
[4:03:41]
, younohe
[4:03:41]
re very
[4:03:43]
convennt and costffective.
[4:03:45]
And I we have aapacy
[4:03:49]
problem. W eed up7% full.
[4:03:52]
, us oft the e
[4:03:53]
JULY, which means t only
[4:03:54]
differenceeay is our
[4:03:55]
abity to turnits becse
[4:03:59]
we he so man units. F our
[4:03:59]
pective
[4:04:01]
re oveull. S
[4:04:03]
it I does solve aeal b
[4:04:04]
lem, and I really will
[4:04:07]
suorturocal binesses.
[4:04:09]
, which means thathe
[4:04:12]
restaura ownerhe, the,
[4:04:13]
the rep a the mic
[4:04:16]
cent, tlce
[4:04:18]
ople tt thadam tald
[4:04:20]
abt, tse are realeople.
[4:04:23]
And the moreean kp o
[4:04:25]
local emploes living
[4:04:26]
downtohey
[4:04:27]
re narng
[4:04:29]
on the strtow And they
[4:04:30]
re,
[4:04:30]
um the
[4:04:31]
reart ofur
[4:04:33]
communit Ae bel I
[4:04:34]
s.
[4:04:35]
An I kw t counc ds,
[4:04:35]
too. It
[4:04:36]
s it
[4:04:37]
really test
[4:04:39]
swer. So hefly I awed
[4:04:43]
so o tuestions. Um,
[4:04:44]
, for y.Ut we a very
[4:04:45]
ncerd with trossover
[4:04:48]
effe, meaninghahe rents
[4:04:50]
are aeadytaed ove uh,
[4:04:53]
rsus wte had in,m, 2
[4:04:55]
w first gpproval
[4:04:57]
2013. Another thing is Sttle
[4:05:00]
in 23as the 27th most
[4:05:02]
expens market inhe natn.
[4:05:04]
Largeit area. We are n
[4:05:06]
numb six. Shat
[4:05:07]
s aer
[4:05:09]
pl ofre ren are jt
[4:05:11]
pug tough over tver
[4:05:13]
th line. Tnk youy muc
[4:05:15]
Thankou fha answeo my
[4:05:19]
qution.M, theust overall
[4:05:22]
omments and um, answers t
[4:05:26]
the sff queioir. U
[4:05:28]
I really appreciate the w of
[4:05:29]
. Patently and Sustainle
[4:05:32]
rk Artsovive a
[4:05:34]
award winni approach provided
[4:05:35]
flats that affordable
[4:05:38]
tors at 60% Ami. Without
[4:05:40]
subsidy. I on Plannin
[4:05:42]
Commission when thi concept
[4:05:44]
firsted forward, and t
[4:05:45]
origin zoningad this
[4:05:47]
poible wh png
[4:05:49]
flexibility.Ovgwa
[4:05:52]
ers theis of these
[4:05:54]
rents going up
[4:05:57]
reconfigin t market
[4:05:59]
te housing. Um,he city
[4:06:00]
sustaibl Kirkland has
[4:06:02]
woed several years
[4:06:04]
tr t prevent this. Um,here
[4:06:06]
reposals that came
[4:06:08]
ious councils. Of the
[4:06:09]
blic comme that we
[4:06:10]
gotten I the emaile
[4:06:10]
ve
[4:06:13]
havesk about
[4:06:13]
Amazon Microsoft
[4:06:14]
s housing
[4:06:17]
fund instead ofublic
[4:06:18]
partiph, public
[4:06:20]
funding.Hat wast of
[4:06:21]
methingou looket a
[4:06:24]
ar ago. With it fel
[4:06:25]
through becsese fd
[4:06:27]
prioti were oer housing
[4:06:29]
types. But even whe they wer
[4:06:30]
lookingt this,e pubc
[4:06:33]
particat was rui
[4:06:35]
Um,iven oh tarts
[4:06:40]
If the unitsonverted to
[4:06:41]
rk rate, we wou still
[4:06:43]
ve to make for the
[4:06:45]
fordablenits and for
[4:06:48]
our $500,000 investment. We
[4:06:48]
re
[4:06:57]
preserving 2ts at Ami for 2 to 40 years. That
[4:07:02]
out $2,293 per u u to
[4:07:04]
to Cncim Chisholm
[4:07:06]
poin onerest. Would
[4:07:08]
pport thisn if it a
[4:07:11]
t. Um, so support this
[4:07:12]
ero intes loan b
[4:07:12]
we
[4:07:14]
reng some cle p
[4:07:16]
nefit to some ohe issues
[4:07:18]
for councilonsideration. Um,
[4:07:22]
riority isle, I support the fus onco flats
[4:07:26]
versus other types of, um,
[4:07:30]
unitsn rent increases. Um,
[4:07:32]
te in presentation in the
[4:07:34]
pack thatecause are
[4:07:36]
rdableni the tent
[4:07:39]
prottind House Bil 1217
[4:07:39]
don
[4:07:45]
t app. But,m,h,
[4:07:47]
rent I linked to Ami. Well, we
[4:07:50]
ve seen rent spikesnmi
[4:07:52]
s spiked. So if this
[4:07:54]
thingt was a
[4:07:56]
showstopr foreral project
[4:07:56]
ing, I
[4:07:58]
d le to s
[4:08:01]
afflore, the
[4:08:02]
tions t are inouse
[4:08:04]
bi217. Perhaps something
[4:08:07]
along tines u
[4:08:10]
mi ren increases u
[4:08:14]
increa in a or t, um,
[4:08:16]
e Bill01equirements,
[4:08:18]
whatev lower. That would
[4:08:20]
muggestion,ut would like to explore somethingik
[4:08:23]
that. Um,nd uh, b that
[4:08:27]
and totally supporte of, um,
[4:08:28]
moving fwa with thi and
[4:08:32]
appreciate, uhe develops
[4:08:34]
and teamg thisrd.
[4:08:39]
K you.
[4:08:42]
Th you,ilmemberl.
[4:08:44]
Ah, I just aou of
[4:08:45]
qutifter lng to
[4:08:50]
Robert, I speak.Nks for coming. Um, tith Rober
[4:08:52]
and Angel I appreciat it.
[4:08:55]
Um, aion. Um,ou know,
[4:08:56]
f the bullets up here
[4:08:59]
the unites n Um, 1
[4:09:01]
to 3 bedroomts aren
[4:09:04]
includ. Uh, cld you tk a
[4:09:07]
littleit morebo that? And
[4:09:11]
what wha the
[4:09:16]
ne to change t include those
[4:09:25]
Did I do thaht?
[4:09:26]
Yes.
[4:09:27]
Gohe
[4:09:29]
Okay. Uh, I w to make se
[4:09:32]
m supse to speak. Okay.
[4:09:34]
Um,ld love to inclu t
[4:09:39]
1 to bedroom uts if we
[4:09:40]
did ts athioint, can
[4:09:43]
tell you tha the underwrits
[4:09:44]
for our loaould just it
[4:09:45]
wn flat, because w
[4:09:46]
alread a the question.
[4:09:48]
What c we do? I wld
[4:09:50]
require reduction of the l
[4:09:53]
amntm, and this
[4:09:55]
h, toak that wk.
[4:09:58]
Amazon for units, put up 2
[4:10:00]
miio Kiran aea ago
[4:10:03]
so.Ou probably lookingt
[4:10:06]
the sam ratio. You kno
[4:10:09]
approximelt would tak
[4:10:11]
about $14illion from Amazon
[4:10:13]
to me thatk. Tha
[4:10:13]
an
[4:10:16]
apate. Um, orhe city
[4:10:17]
obou theit could
[4:10:19]
s fine.E want t it.
[4:10:21]
Um, thereighte an
[4:10:23]
opportunit when get thi in
[4:10:24]
Ire
[4:10:25]
s a way we
[4:10:31]
n get there in any. People kno me. I will do
[4:10:33]
erything I to m it
[4:10:36]
. Even if wan fin
[4:10:41]
or or 7nitsl fall all over ose to it
[4:10:43]
pp
[4:10:47]
Thank you.
[4:10:48]
So
[4:10:54]
s nt? Deputy mayor?
[4:10:57]
K you. Mayor. Um, yeah.
[4:10:58]
Ank you for this
[4:11:01]
conversation. Tha you. Um.
[4:11:03]
Ste. Kklr.Ee.
[4:11:04]
Th you for the work
[4:11:04]
ve
[4:11:06]
do I community to hp
[4:11:08]
use theater mixf
[4:11:12]
housinypes that we nee Um,
[4:11:13]
somefhich, lik the Eagle
[4:11:16]
Flats, uh, can be naturally
[4:11:17]
occuin affordableousing, as we
[4:11:19]
veeeo, uh,lly
[4:11:24]
iate yourk. Um, I do
[4:11:27]
have a c ofs.
[4:11:29]
Nt I,ou know, I wan
[4:11:30]
sort o hht f for
[4:11:32]
st I, suprt u moving
[4:11:34]
forward with t I, I
[4:11:38]
appreciate u Ippe
[4:11:40]
the,he valuef this
[4:11:43]
ect. U this I
[4:11:46]
id of presein u o
[4:11:47]
nay occurng affordable
[4:11:51]
housing, hinow
[4:11:53]
,pplicants be of mns
[4:11:54]
te uh, that they will
[4:11:56]
o meet the l income
[4:11:59]
requiremts u the cost of
[4:12:03]
is $500,0 versus, uh, t
[4:12:05]
cost of cstgew
[4:12:08]
uns or renovatin new.
[4:12:09]
Um, we kw that constructg
[4:12:12]
units uts
[4:12:13]
rohl600,000. In o
[4:12:15]
current market. Um,nd we
[4:12:21]
getting, the ped units. Um, f lessha that.
[4:12:25]
Um,oreciate all At
[4:12:27]
the same time, know I have,
[4:12:27]
, I
[4:12:28]
m cognizant ofy
[4:12:30]
responsibility t Kirkland
[4:12:33]
tas and and the
[4:12:34]
portunityts assocte
[4:12:36]
thing thisey on
[4:12:38]
project and others. S
[4:12:40]
I do want to provide my
[4:12:42]
back to to staff. There are
[4:12:44]
a cpl ofhe reallort
[4:12:45]
of teereas reallyo want
[4:12:48]
o, uh, en the
[4:12:52]
ations. Um, Iou like
[4:12:54]
us to sort o stress t Uh,
[4:12:56]
I apprecie MR. Pant l
[4:12:56]
s,
[4:13:00]
uh, respons to the
[4:13:01]
some of t one,wo and three
[4:13:03]
droom uni. If is
[4:13:05]
poib Uh, if could be
[4:13:07]
part of t mix of affordable
[4:13:08]
uns. Um,
[4:13:09]
d like t
[4:13:13]
o exploret a little bit further. Um, m the
[4:13:14]
a littleitixing,ix
[4:13:16]
atching that can b done
[4:13:19]
to, get a um,us a f
[4:13:21]
ly sed u units
[4:13:25]
inud Um, if maybe some
[4:13:27]
mber ofch of the 2 Echo
[4:13:28]
Flats a not include I don
[4:13:29]
know, b I
[4:13:30]
d like tlore
[4:13:34]
at t ideather. Um, I
[4:13:36]
uld also l to explore just
[4:13:39]
tle bit fth the length
[4:13:40]
ofhe affordability
[4:13:42]
mm. So whene
[4:13:42]
re
[4:13:45]
vi furtheronions as we proceedith this, with w
[4:13:48]
this ppo u you
[4:13:51]
typill, uh, affda
[4:13:54]
ojects in Kirkland,
[4:13:54]
sor
[4:13:56]
ife of the proje,
[4:13:58]
affoab Um, understan
[4:13:59]
th notar of the current
[4:14:01]
proposal. Id l to explo
[4:14:03]
thatus further to fd out
[4:14:05]
s anything that
[4:14:09]
workable. U for a lge term
[4:14:10]
cont. And t the
[4:14:13]
st topic or the lt sort o
[4:14:13]
element t I
[4:14:16]
d like the staff toxp andhe
[4:14:19]
just sor ohe top. Um,
[4:14:21]
t theres a, is a
[4:14:23]
al, u taxefit to the
[4:14:28]
operty oer from, uh,
[4:14:30]
taxit. It doe seem
[4:14:30]
tohat there
[4:14:31]
s thereig
[4:14:36]
wayo h the city
[4:14:37]
ti theax paid
[4:14:39]
back a, o a, slightl on a
[4:14:41]
icker schede. So I w
[4:14:42]
like t e the pme
[4:14:45]
rm little b. Um I
[4:14:46]
m not
[4:14:48]
ascernedut thent
[4:14:49]
on the ln. I
[4:14:50]
m you
[4:14:50]
know, I
[4:14:52]
my whhe idea of
[4:14:55]
a zero of interest loan,
[4:14:55]
but there
[4:14:56]
a repayment
[4:14:58]
schedule g t benefs
[4:15:01]
at our annual, um, tt a
[4:15:03]
percta of those t
[4:15:04]
be coulde backo the
[4:15:05]
citynd repay the loan a
[4:15:08]
lile faster than just a
[4:15:09]
fi balloonaymentf
[4:15:11]
$500,000t the end o
[4:15:12]
ar Um,
[4:15:12]
d like toxp
[4:15:15]
th ae further. Um, and
[4:15:17]
inie interest rates, you
[4:15:18]
ow, there wlde ire
[4:15:20]
wa a repaymentule, then
[4:15:21]
ther we finance charges
[4:15:22]
if ps werate toor
[4:15:24]
of justncentivize timely
[4:15:25]
payment.M, so that
[4:15:26]
e one
[4:15:27]
y toort of recapture some
[4:15:30]
the value, te val,
[4:15:31]
um, paymes aren
[4:15:31]
t m
[4:15:32]
time, i
[4:15:33]
m n expecting that
[4:15:33]
th
[4:15:34]
t be.Ut uh,
[4:15:35]
alwae to accnt for
[4:15:39]
at. So, um, unless sta has
[4:15:41]
anstions abouty ideas
[4:15:45]
the. Um, hand I
[4:15:47]
d it back. Okay. I
[4:15:48]
a thumbai from cy
[4:15:53]
manager, t you.Thank you u Councilmember
[4:15:54]
Falc and Councilmb Prem,
[4:15:54]
we haven
[4:15:56]
hrom youet.
[4:16:00]
Coember. Wl, there you go. Councilmember Falcon.
[4:16:02]
Th you, Madamor. I
[4:16:03]
ntlytening the
[4:16:04]
convertio that I would
[4:16:06]
have thingso respond to and
[4:16:07]
to see if, you kno be able
[4:16:09]
share my thoht on, u
[4:16:10]
great ide from coming
[4:16:14]
my fellowou members. Well, first, um, t you. Um,
[4:16:18]
MR. Lee.Is Rosman and all the partnersvednor
[4:16:20]
brgihis to uou know,
[4:16:22]
weeard fm t comni
[4:16:23]
loud andar din the
[4:16:25]
mpivela process that
[4:16:27]
ey want u prioritize
[4:16:29]
preserving affordable housing.
[4:16:31]
And to me, this is ao
[4:16:31]
brne It
[4:16:33]
s great opportunityhat you
[4:16:33]
re
[4:16:37]
enting to Um, to be able tore hundreds of
[4:16:38]
of afforbl housing in
[4:16:42]
ouy and ih a prime
[4:16:44]
on inowntownand.
[4:16:48]
A lot ohe workoming out of, um, u22ou know, in
[4:16:50]
the comprehsi pla was
[4:16:51]
really just abouthe
[4:16:53]
number of afforbl uts that
[4:16:54]
weal about, butlso t
[4:16:57]
quality life of, ofnd the
[4:16:59]
amit inlose promio
[4:17:00]
the aor housing that,
[4:17:01]
hat we
[4:17:04]
ved on here in the city of Kkl And so that
[4:17:06]
s, um, that
[4:17:08]
a big factor here, too.Hi is a pri
[4:17:10]
locaonorffordable housing
[4:17:12]
atolks he access tohe
[4:17:14]
library to trans,o.Reat.
[4:17:15]
You know, restaannd
[4:17:17]
parks. Um, tnk you for
[4:17:21]
that. U d havee
[4:17:22]
though one ofhe
[4:17:25]
pr, um, policy
[4:17:27]
nsions.Utir I
[4:17:28]
a question onne of them
[4:17:32]
to to,m, MR. Py or
[4:17:35]
Rosman about the idea of
[4:17:39]
explorin additiolen of the commitment onordable
[4:17:43]
housing. C you t the
[4:17:47]
feasibility of tt, the potentialmpact on the underwriting or oth
[4:17:49]
consideratio? Just wt to
[4:17:50]
hear thoughts o that
[4:17:53]
be I mhoughts.
[4:17:58]
So um, I wouldove t extend.
[4:18:00]
Um, a whae will is w
[4:18:01]
will go bk to our f Mae
[4:18:03]
representati and tell them
[4:18:06]
what we wanto do. But I would
[4:18:10]
ve to,nd my thought the
[4:18:13]
ghtech, um, standard is5
[4:18:14]
years intate of
[4:18:17]
gton. So sms like
[4:18:17]
they
[4:18:19]
done enoh financi.
[4:18:20]
So that going to bur
[4:18:23]
est.E extend,m,
[4:18:25]
wiou a penalty of the
[4:18:26]
underwriting? And I gets a I
[4:18:29]
thk should work.Ut w
[4:18:30]
stardith thisss
[4:18:32]
we srt with,ith, uh,
[4:18:35]
fitime arod. Um, and
[4:18:35]
we
[4:18:37]
veal to aot
[4:18:39]
noitsnd eve the
[4:18:41]
n-profits, national firms
[4:18:42]
that havillions o dollars
[4:18:43]
real estate. I
[4:18:45]
m shocked at
[4:18:47]
wensitive the a to these
[4:18:50]
kinds ofs. So, um, and it
[4:18:51]
s all aut abl to
[4:18:53]
finance out the term ofhe
[4:18:56]
second buyer. Um, it isn
[4:18:59]
aboutng I done n.
[4:19:01]
What happens Excuse me?
[4:19:04]
Ke aig techerm I 15
[4:19:04]
year a by the time y
[4:19:05]
re
[4:19:05]
all de,
[4:19:07]
s 17 o 18ears.
[4:19:09]
Ds this n ber look
[4:19:12]
for?, um. You hey
[4:19:13]
so commitmen We
[4:19:15]
collaborat with theit staff
[4:19:17]
and and w veryd to me
[4:19:19]
that hapn. Wld one
[4:19:21]
would be haper than I am
[4:19:24]
se t extended.Great. Thankou. That
[4:19:26]
helpl. In,yn
[4:19:28]
this is t I have two
[4:19:29]
here. One, I want t
[4:19:31]
sure w,m, tgest
[4:19:33]
community benefit ttld
[4:19:34]
ac be helpf t
[4:19:37]
communityemost need.
[4:19:39]
And two,hat we d kill the
[4:19:41]
dealy any changeshat we
[4:19:42]
to see,ig I w to
[4:19:44]
makeurs goesough
[4:19:44]
we don
[4:19:46]
treeze
[4:19:47]
try toet so mh out of I
[4:19:49]
some, um, pen
[4:19:50]
pa walkwarom the
[4:19:51]
Right. Sse arein
[4:19:54]
of my mywo cck
[4:19:55]
mashat I want t make sure
[4:19:56]
any, y k in any ohese
[4:19:59]
pr, um, gdaha we
[4:20:01]
gi toffootiate
[4:20:02]
with,h you the team,
[4:20:04]
um thateheck bot of
[4:20:06]
the. So I amportive of
[4:20:07]
uncil Arnold
[4:20:10]
s idea of mirroring, you know, t the
[4:20:12]
capnent increas. And t
[4:20:13]
House Bill 17, I think t
[4:20:17]
a grea. Um, and, I
[4:20:18]
uld likeo thator, f
[4:20:20]
obviousns, bau as
[4:20:20]
lo that doesn
[4:20:21]
k the
[4:20:22]
alhink that w
[4:20:22]
certainl p a bte
[4:20:27]
communit benefit. Uh, s do support t also support
[4:20:29]
asking an additiol length
[4:20:30]
of commitmt on affordabity
[4:20:30]
If that
[4:20:31]
som, ain
[4:20:31]
that
[4:20:32]
ot going toil the
[4:20:33]
de. If itou like
[4:20:34]
yore comfortablet
[4:20:35]
with t ask if it
[4:20:36]
s notoing
[4:20:38]
to, um, you offend enoug
[4:20:40]
for folo walk ar
[4:20:42]
least, decrease their,
[4:20:43]
their tn the
[4:20:46]
neions. Um,n I would
[4:20:51]
support tut I the judgmentf staff a and you
[4:20:53]
MR. H and havin that
[4:20:54]
sationund
[4:20:56]
apop the. Um, for
[4:20:58]
those sam reasons, d
[4:21:01]
pp um, uh, mesng wh
[4:21:02]
either l addingerest
[4:21:04]
on the loan or havin earlier
[4:21:05]
paymentsnhe loan, juste
[4:21:07]
Councir Arnoldaid. Was
[4:21:11]
all in thisnd thought it was h y return
[4:21:13]
investme for a reliv in
[4:21:14]
thnd scheme ohings, b
[4:21:16]
relatively small, smaller
[4:21:17]
investnt cdo
[4:21:18]
valuef the project and the
[4:21:20]
e of the retn of j
[4:21:22]
havingte a grant. R s
[4:21:23]
it en being alone is fe
[4:21:24]
with me. Don
[4:21:24]
t suppo any
[4:21:26]
rest or anylier payme
[4:21:27]
on tha and wouldven b
[4:21:29]
fine in back torant
[4:21:30]
t was necessary to g
[4:21:31]
some of ter ter that we
[4:21:32]
want. Um,s an I d
[4:21:33]
t know if
[4:21:33]
that
[4:21:35]
s eveething that would be attracte as a
[4:21:37]
neti token, but that I
[4:21:38]
something tha would b happy
[4:21:40]
support. Um, if couldet
[4:21:41]
usome of t things
[4:21:44]
re looking f Um, I
[4:21:45]
the sameson, becse of
[4:21:47]
yonse to the or 3 bedroom, I
[4:21:49]
t suppo going
[4:21:50]
backo table thehe
[4:21:52]
larger units. Given t
[4:21:52]
we
[4:21:53]
ve aeaone that, Iant
[4:21:55]
, um, mak sure thay
[4:21:55]
knowhahey
[4:21:55]
ve alreadyn
[4:21:56]
heardnt. Right. I
[4:21:57]
ng that you
[4:21:58]
already
[4:22:00]
that, um, andhat that
[4:22:05]
notea Um.
[4:22:07]
I.Just wanto sure I
[4:22:08]
respde t all of tm. So I
[4:22:09]
there
[4:22:09]
s som g ideas
[4:22:10]
discussing Those arehe
[4:22:11]
Io and don
[4:22:13]
support. Um, a
[4:22:14]
again, Ink this I a no
[4:22:16]
r. A thissxactly
[4:22:17]
atommunity asking
[4:22:19]
for, fors to psese
[4:22:21]
tys units. Um, sohank
[4:22:22]
u for bng forth
[4:22:24]
the opportunity
[4:22:27]
an you, Couilri
[4:22:29]
Allig Thanks. Yeah.O
[4:22:30]
first I,ust want t
[4:22:32]
recognize andeallyha you
[4:22:33]
all and eveon involved in
[4:22:37]
ng this ppoward to us. Ienuinely respect the
[4:22:38]
go preserving
[4:22:40]
affordability.Nd I appreciat
[4:22:41]
e efforto findy
[4:22:43]
ve wayso keep
[4:22:45]
unit accsi to lower
[4:22:46]
incoesidents. I
[4:22:50]
veee the units myself and thoroughl
[4:22:52]
imes by creatit of
[4:22:56]
th d of t units and, um, completely understan w
[4:22:57]
you have a l vacancy
[4:22:59]
rate right across the
[4:23:01]
boar Um, I thank you for
[4:23:02]
so for tnk of
[4:23:04]
tey inting a
[4:23:06]
veo keep these uts
[4:23:09]
rdable f tg run
[4:23:11]
Um, I, I having s that,
[4:23:14]
stilo have some questions as
[4:23:17]
whether this aees I
[4:23:19]
ssary given
[4:23:20]
characrif this
[4:23:22]
ularrty. So I want
[4:23:23]
nderstand that ait bit
[4:23:25]
I would I wouldike t
[4:23:27]
get som more infman
[4:23:30]
actly what the rk I,
[4:23:32]
future owner would ce in
[4:23:34]
and suddenl conve tse
[4:23:36]
units intoh pce marke
[4:23:39]
tepartments.Hi u
[4:23:41]
like if ultimat goal I to
[4:23:45]
t ren low s tt
[4:23:46]
indivial thatre bow the
[4:23:49]
% Ami are able afford it.
[4:23:51]
I justano understand a
[4:23:53]
new oer comesn, ishe
[4:23:55]
realihoodnd what ae
[4:23:58]
basi thatikd Um,
[4:24:00]
toay that the rents will
[4:24:02]
dramaticlyncrease. Saybe
[4:24:04]
ore information on tha
[4:24:06]
woule reallyul.
[4:24:08]
Ll supportiv ofhis
[4:24:11]
id Um, but I dohit
[4:24:13]
rmation pluay
[4:24:15]
pol oio
[4:24:19]
tes the loan term.M, and
[4:24:20]
en in terms like the
[4:24:20]
terestat I
[4:24:21]
m, I
[4:24:21]
m, you
[4:24:22]
I don
[4:24:23]
hink I favor
[4:24:25]
th much, but d think
[4:24:28]
e theer uh, duration,
[4:24:30]
uh, and the various options
[4:24:32]
there be hpf uh,
[4:24:40]
informatioThank you. Anyone else? All
[4:24:42]
right. I also want toha you
[4:24:44]
both fringing a
[4:24:45]
ou
[4:24:46]
ve bee partners
[4:24:48]
with city. One coue
[4:24:49]
in
[4:24:51]
m hri from the m
[4:24:54]
counci m. I spo.
[4:24:56]
Oking at anlier payment
[4:24:58]
ti Ift can hpe Um,
[4:25:02]
, any pt we
[4:25:03]
t, wean reinvest in
[4:25:06]
oj And I appreciate
[4:25:07]
our deput mayor
[4:25:08]
s ideaf
[4:25:13]
swpiome lgets for some eco flats,ecause weo
[4:25:16]
kn that,m,eav we hav
[4:25:18]
a need forar uni withi
[4:25:20]
th c So I would le to
[4:25:22]
exple those My, my
[4:25:23]
commt or my qn I
[4:25:25]
really the cit manager a
[4:25:26]
th haven
[4:25:27]
talked about
[4:25:33]
where ts 500,000 I going to come fro And so how would w
[4:25:35]
fund00,000? Ands there
[4:25:38]
an opportunity cost to to
[4:25:39]
canouddress t
[4:25:41]
Please
[4:25:43]
ah u the good ns ishi
[4:25:45]
one h already bn set aside
[4:25:47]
Um an ablesing
[4:25:49]
uh, account uh, f real
[4:25:50]
esxciseax So thisas
[4:25:52]
budgetedouple of yeago.
[4:25:53]
D the previous budget,t
[4:25:54]
caiet forward. So
[4:25:56]
alreyhere. Um, I
[4:25:58]
original set a w the
[4:26:00]
leure gave cities the
[4:26:03]
abily to usel estate excise taxor fordable
[4:26:04]
housing.Heginallyid it
[4:26:05]
wi sunsetvision. A
[4:26:06]
Kirklandasne of the f
[4:26:07]
cities thaually tried to
[4:26:09]
us for aor housi.
[4:26:10]
So thatas of the impus
[4:26:12]
of us setting. A
[4:26:13]
also wando demonstrate to
[4:26:14]
theegrehae would
[4:26:16]
use it. Um, thanks
[4:26:16]
Kirkland
[4:26:19]
advocacyn other cities, we aua were
[4:26:21]
g tt cap removed. So it
[4:26:23]
ver did. Sse So any
[4:26:24]
city c use realst
[4:26:25]
exciseax, referra housi
[4:26:26]
gog forward. That
[4:26:26]
she
[4:26:29]
good news. Um,ut bottom lin
[4:26:29]
is alreadye it. I
[4:26:30]
fully
[4:26:31]
dgeted it
[4:26:31]
s alrdy
[4:26:34]
there.So.And howuc is in t
[4:26:37]
account.Right now? Just the00.
[4:26:42]
The 500,0nd and a
[4:26:43]
m looking opportunity
[4:26:44]
s. You know,re
[4:26:44]
s going
[4:26:46]
to be anotherject in six
[4:26:48]
, a year, five. So
[4:26:50]
howckly will thaccount
[4:26:51]
reh.
[4:26:51]
, that
[4:26:53]
a g budge
[4:26:54]
conversatiith the council
[4:26:56]
Thert versi of that. Is
[4:26:58]
at until the reale
[4:27:00]
exciax ised to b
[4:27:03]
used for aor h, w
[4:27:04]
all of o contribiore
[4:27:07]
essentially t Arch and the Arch Tst Fund a
[4:27:09]
ects retni t city
[4:27:11]
they are funded by arch um
[4:27:12]
state excise tax
[4:27:13]
rrentlyaso be spent
[4:27:15]
within the limits. So one
[4:27:17]
of the challens ofing,
[4:27:18]
whould I spend it next if
[4:27:21]
h money? Is Kirkland alone
[4:27:21]
doesn
[4:27:22]
t get s of the 10 1
[4:27:24]
h that ah doesn it
[4:27:25]
go the county the
[4:27:26]
stats all the o
[4:27:27]
funding. S weld have to
[4:27:29]
ve a project where t kind
[4:27:30]
oney would me a
[4:27:31]
diffen for Kkl
[4:27:33]
prndht now there
[4:27:35]
a couple ias outhe that
[4:27:35]
we cld at, bute
[4:27:37]
ha ag onuron.
[4:27:38]
So ourt was r a
[4:27:41]
opitiesrose, kept with proposals forsi resin
[4:27:43]
exciseax to make happen.
[4:27:45]
So village be aon
[4:27:46]
can talk a there
[4:27:47]
other places too that could
[4:27:50]
ok butt theom
[4:27:52]
ers nothing whehing
[4:27:53]
ke makes tference
[4:27:54]
t would her wheref we
[4:27:55]
ed it now, would make
[4:27:56]
deal happe There isn
[4:27:58]
somethin cly o
[4:27:59]
table w if wse it, w
[4:28:01]
no ideat would happen.
[4:28:02]
Thankou. It
[4:28:03]
bi I the hand.
[4:28:04]
Gh
[4:28:07]
All. That w all
[4:28:10]
meo doou f like you
[4:28:13]
w you no te the
[4:28:16]
neps?Yes.Ha for all t
[4:28:17]
feedback.
[4:28:18]
Okay.
[4:28:19]
All rht Thank y,ert.
[4:28:24]
Angela, stayinge with us. Wll see yoon.
[4:28:26]
Thank very m Weply
[4:28:29]
preciate.
[4:28:32]
All rig. We a movg ono
[4:28:35]
ne e, whichs briefing on
[4:28:36]
total l Souther
[4:28:38]
Inal subareais
[4:28:39]
cityan And guessing
[4:28:42]
Adam syi
[4:28:44]
ah. This atem
[4:28:45]
re
[4:28:45]
we
[4:28:46]
ng to try
[4:28:46]
apprectehose already
[4:28:47]
providedheing
[4:28:47]
mm. We
[4:28:48]
re notoo
[4:28:50]
fo um,ecision by the
[4:28:51]
cil today. J informaon
[4:28:53]
angend feedback.
[4:28:53]
Ll go
[4:28:54]
ahnd turn it back tm
[4:28:57]
West planng building director
[4:28:58]
Actually, m I just goi
[4:28:59]
to take thisneur senior
[4:29:03]
planner.
[4:29:04]
An you. You, Cy
[4:29:07]
Mage u just one momen
[4:29:34]
here. Apologi f that. Some
[4:29:37]
nical difcu Can y
[4:29:38]
see my see Okay.
[4:29:39]
Can.
[4:29:42]
Ok Tnk you. Um.D
[4:29:43]
evin Mayor,eputy MAY
[4:29:45]
and counc members. Ill be
[4:29:47]
pren tonht on the Totem
[4:29:48]
Lake Sth Industrl
[4:29:51]
Suhase one. Um, Iave
[4:29:54]
tenlides t cover, and
[4:29:55]
the no fma directi
[4:29:57]
requested from couil tonig
[4:30:04]
this project.O, aef
[4:30:06]
ound ohe area
[4:30:06]
thos w aren
[4:30:08]
tam Um,
[4:30:09]
this area located I the
[4:30:11]
soutes corne of the t
[4:30:13]
Urbanwth c Um,
[4:30:15]
it is up o warehouses
[4:30:17]
ilt between 1960snd
[4:30:20]
1980 primarily, u for
[4:30:21]
cturing andight
[4:30:23]
du usithin
[4:30:25]
oximity toha used t be
[4:30:28]
the u railway is n the
[4:30:30]
osklanddor, which
[4:30:31]
you can see thisap um,
[4:30:34]
ru northouthn green.
[4:30:37]
Andve time, area transitioned be mix
[4:30:40]
ofce, constructn, rai
[4:30:43]
umsale dution, automotive, automotive uses,
[4:30:45]
inor recreatn andth
[4:30:49]
rv uses. Andhe are
[4:30:50]
ae of residential
[4:30:51]
vets whi the area
[4:30:53]
today, ilu an apartnt
[4:30:56]
mp and two tnh
[4:31:00]
velopments um, and Forbes
[4:31:02]
Creek r through t
[4:31:04]
but isos hidde behind,
[4:31:05]
um,ar lotsnd warehou
[4:31:11]
builng today So this
[4:31:15]
ect began in 2022
[4:31:17]
a cmuni amendment
[4:31:19]
request, um, t the city
[4:31:21]
received um, rezone sever
[4:31:23]
parcels on western sidef
[4:31:25]
the subaream, which we
[4:31:28]
th p mac sites to aow for
[4:31:29]
igh density residenti
[4:31:32]
mixed And 2023,
[4:31:33]
throug t review of t
[4:31:35]
request, um cedo
[4:31:38]
expand thea mac c sdy
[4:31:40]
ar tonc the fl
[4:31:42]
Southendustrial Subarea
[4:31:46]
ighborhood.Nd then in 2024,
[4:31:47]
as part ohe comp policy
[4:31:51]
pres policy tl 33.1 was
[4:31:54]
ad um, create
[4:31:56]
sure pla for t area t
[4:31:59]
conser a mixed use, walkable and sta
[4:32:01]
neighborhood. And then tha
[4:32:03]
brings u to wree are tay
[4:32:04]
d I
[4:32:05]
m presentg on
[4:32:08]
tonight.M, whichs phase one
[4:32:09]
of developing thatea
[4:32:11]
plan. So the cityved
[4:32:12]
grant t partner a tea
[4:32:15]
from Denrk u blocks hub on
[4:32:18]
phase o. Aha one h
[4:32:20]
been focus onstanding
[4:32:21]
ex condionf
[4:32:23]
area. Um, initial stakeholder
[4:32:25]
engame and visioning for
[4:32:29]
rea. And nt year I
[4:32:34]
2027,m, phawo will commence,hich will be the
[4:32:36]
full subarea plannin process
[4:32:40]
and include evaluation of marking marketditions for
[4:32:42]
xistings explore
[4:32:44]
opportit toandousing
[4:32:52]
allowances. A I med,
[4:32:53]
e partneredith Block
[4:32:55]
Hub for thitial visioning
[4:32:56]
phase the Sth
[4:32:58]
Industri Subarea. Um,cks
[4:33:00]
Hu a Nordic hub for
[4:33:01]
sustainableization bas
[4:33:03]
in Copha we
[4:33:03]
ve
[4:33:05]
rtnered with t previously.
[4:33:07]
Um, t work focuses on
[4:33:09]
fali-sector
[4:33:12]
llaboration withies around the wld to are
[4:33:14]
aredrb challens. And
[4:33:16]
r project, um, they
[4:33:18]
assembled am ofcape
[4:33:20]
architects a architect
[4:33:22]
ializing inptive reuse
[4:33:24]
and community engagement
[4:33:27]
list,ndhi work was
[4:33:28]
made posbl t a grant
[4:33:30]
from the Desig Foundation.
[4:33:36]
So a m piece ofhis phase
[4:33:37]
and our w with Block Hub
[4:33:40]
was comni ore Um, t
[4:33:42]
Blocks h teamited
[4:33:45]
rkland tce and hosted um
[4:33:47]
rk with community to
[4:33:48]
understand t perspective
[4:33:50]
collaborate onhared
[4:33:53]
sion. Forow the area
[4:33:55]
could iro andvolve the
[4:33:58]
futum, and weis the
[4:34:00]
area seval times to kno on
[4:34:02]
doors and ask employees and
[4:34:04]
business owns, about what
[4:34:06]
eel is working w in
[4:34:08]
rea. W clde
[4:34:09]
impred then ao invite
[4:34:13]
them t the workshops.
[4:34:14]
Also s with housi
[4:34:15]
develope in thend
[4:34:17]
communy members who ft
[4:34:19]
area. And what werd
[4:34:24]
gera um, I general satisfaction withhent
[4:34:25]
of comrc a
[4:34:28]
residential uses. A lot
[4:34:31]
sses seemedrettyappy
[4:34:32]
with the way t thingser
[4:34:37]
area. Um,hey value areasordable and
[4:34:39]
ible cial s u
[4:34:41]
er somee f more
[4:34:43]
food optio I area for
[4:34:46]
pe to grab lunch at.
[4:34:50]
Also a strongupport for
[4:34:53]
ovingess to the k um,
[4:34:54]
kind of oni up t to
[4:34:57]
eoeduceraffic
[4:34:59]
congestion and bte connect
[4:35:00]
th ait the restf the
[4:35:07]
ty Um we also a
[4:35:08]
lot about businesse and
[4:35:12]
ity members are unaware each other. Um, a
[4:35:13]
lot of the buses are kd
[4:35:15]
of tuckednd u not
[4:35:25]
visited often Um,hr
[4:35:27]
the outac and worksps u
[4:35:29]
the teaollected over
[4:35:31]
hundre I for how the a
[4:35:34]
codvolver beved.
[4:35:36]
Um andn tookse 100
[4:35:39]
nd apped the five
[4:35:41]
ia to the So conct
[4:35:43]
experimental rooted, nature
[4:35:46]
based a collaborati and,
[4:35:50]
um, u reduce them dow to
[4:35:53]
nine umn cs. Um,
[4:35:56]
and each ose concepts, um,
[4:35:57]
f outh the
[4:35:59]
mmnd with citytaff
[4:36:01]
identif starting points,
[4:36:03]
ke actions, how concept
[4:36:05]
coulde scaled, ild
[4:36:11]
enabledoughegulations, and thents attenti f
[4:36:13]
ial hdl a tn
[4:36:14]
lastly, w should beved
[4:36:16]
th implementation.O t
[4:36:19]
diagra herehowsllinf
[4:36:22]
concepts. Um and attachment
[4:36:27]
threen the sta memo includes lot more detail. The blocks have t wrote u
[4:36:30]
great rept.Mling each
[4:36:32]
te conces a um,
[4:36:34]
nd ofll of the the k
[4:36:38]
poinor them. But Im
[4:36:40]
ing to touch two ohem.
[4:36:41]
Um, s get aaf what
[4:36:45]
re. Um, first is
[4:36:48]
ding and malpt.
[4:36:51]
So concept iso create
[4:36:55]
identiin log or icon or color a createayfinding
[4:36:57]
signag for t area, which
[4:36:59]
would helpate adentity
[4:37:01]
for the are a connect the kc
[4:37:03]
s and surrounding
[4:37:05]
neighborhos within tsrea.
[4:37:08]
Um, a thenur would als
[4:37:09]
actite thear blank
[4:37:10]
fade So
[4:37:11]
s these you
[4:37:16]
know l warehous that kind of lin the kc, um, and
[4:37:18]
adding some a there would
[4:37:20]
ki openp, um, and add
[4:37:28]
al interest t thosearge walls, and inve people into the are The key actions
[4:37:31]
for thispt wereo, um,
[4:37:33]
send o an open c for
[4:37:35]
an bg propols apply
[4:37:36]
the art toxi
[4:37:38]
astructure suchs
[4:37:40]
paventti or
[4:37:42]
walls,m, and del a
[4:37:44]
wall mural concept
[4:37:46]
fo on tersection of
[4:37:48]
nature and ius that is
[4:37:50]
present ihis area. The
[4:37:58]
regulatory enablers, um, be,m, allowingns. So a
[4:38:00]
sign pmi process to a
[4:38:02]
sawi board signsr
[4:38:04]
rel s o the cake
[4:38:07]
elsewhere in area.He
[4:38:09]
second cce the warehou
[4:38:12]
coep Um, ts was creed
[4:38:14]
becauset of the
[4:38:15]
buildingsn thisre are
[4:38:17]
column strucre which
[4:38:20]
e sucy flebl and
[4:38:21]
o accommodate many
[4:38:25]
different uses. Um, a sohi
[4:38:27]
createsnpportunity to build
[4:38:29]
upon the existing structures,
[4:38:30]
um, eithe byong tm
[4:38:32]
to differentsr adding
[4:38:35]
tohe u w wou, um,
[4:38:36]
preserve the buildings and
[4:38:37]
sses in areahi
[4:38:40]
accommodinew uses such as
[4:38:44]
housing. Key actions for this,
[4:38:45]
,s to d a
[4:38:46]
transformation andevnt
[4:38:47]
guide t show wha
[4:38:48]
possible
[4:38:49]
for these buiin andes a
[4:38:51]
ear pathway for developme.
[4:38:53]
Maybe srt withot
[4:38:55]
aiv demonstrationor the
[4:38:59]
ity Um,egulatory
[4:39:01]
lers maybe offer a heit
[4:39:04]
bonus these pje a
[4:39:08]
pre-approv permit pathways to expeditehe and then
[4:39:09]
tential h, pnt of
[4:39:12]
atn. Um, isation
[4:39:14]
be neededor mixing of
[4:39:16]
reial andustrial uses
[4:39:17]
and tnsion could
[4:39:19]
teync propey
[4:39:26]
lu and de bses
[4:39:28]
looking the comprehensi
[4:39:30]
an policy for area, um,
[4:39:31]
phase o workas begun
[4:39:33]
looking at m of the
[4:39:35]
ctives ofheicy
[4:39:37]
omponents, u thatl
[4:39:39]
benc inheean
[4:39:40]
an. S I
[4:39:41]
ve copd the
[4:39:45]
policyen italics and then
[4:39:46]
piece t p of theol
[4:39:47]
that phase hasun t
[4:39:50]
make progress on. I w
[4:39:50]
t walk
[4:39:52]
through eac them. Um,ut
[4:39:53]
happ tnswer anyions
[4:40:02]
about them So the key takeaways from t work a
[4:40:03]
that there
[4:40:05]
s a lotfife I
[4:40:06]
this areaod Um, there
[4:40:09]
manyma largeesses
[4:40:11]
in thisre wheneere
[4:40:12]
wa around talkingh
[4:40:14]
th, I was c t
[4:40:16]
realoyg t
[4:40:17]
businessocated this area
[4:40:20]
and rely on thear flexie
[4:40:21]
and affordable spaces that
[4:40:23]
ist. Se emp of t
[4:40:27]
businesses that existerere
[4:40:29]
a custom closettore, a cki
[4:40:32]
compan aering c,
[4:40:34]
brer tennis center,
[4:40:36]
liti store, tortilla
[4:40:39]
compy, aut repair shops,
[4:40:40]
ership, a doorompany,
[4:40:42]
drywal company, hardware
[4:40:45]
store, and manyth Um, and
[4:40:46]
yeah, it was f to talk w
[4:40:52]
everyonexisting
[4:40:52]
relatish between
[4:40:54]
businesses and rid and
[4:40:56]
the surrounng area arey
[4:40:58]
mi Weard a l of,m,
[4:40:59]
buesay that the didn
[4:41:00]
t knowha eachth
[4:41:04]
exte u there are two,
[4:41:05]
like,rominent buckets of
[4:41:07]
nesses ihe area. There
[4:41:09]
indoor recreation businesses
[4:41:12]
construiouss.
[4:41:14]
And basn what we, it
[4:41:16]
ds like,ithinhose
[4:41:18]
bu they aym
[4:41:20]
relationship with e other.
[4:41:21]
But the bses o of
[4:41:23]
buckets pretty siloed
[4:41:26]
and hidden away. Um, we learned
[4:41:29]
that the aa, um, would
[4:41:30]
benefit f a stronger
[4:41:31]
identity ande thatcts
[4:41:34]
, reflects its cer. S
[4:41:35]
characteristics that cld
[4:41:37]
be incorra arehe
[4:41:39]
industry nature. Um,
[4:41:40]
intion, theme,
[4:41:45]
production, constructio experimentation, a the py
[4:41:49]
an rion theme. Um, I
[4:41:50]
al b very thathe
[4:41:52]
cake is the area
[4:41:52]
s living
[4:41:55]
spine. It pvi gen space,
[4:41:57]
th space and createsn
[4:41:59]
oprtm,oon
[4:42:02]
bues, crs, u
[4:42:04]
near openpa ao the
[4:42:08]
re desnand
[4:42:09]
la there many low
[4:42:12]
hanging fruit opportunities
[4:42:13]
at exist, um, that be
[4:42:15]
imem in t area a
[4:42:18]
improve it whileultaneously
[4:42:19]
advancing the cit
[4:42:20]
policy
[4:42:22]
goal suc ashe wayfinding
[4:42:24]
d murals concept, ang with
[4:42:30]
. Andt brings uso
[4:42:32]
myt slide Um, wch are
[4:42:32]
ext stepsorhis
[4:42:34]
projt?M, we will the
[4:42:36]
fi design repor wit
[4:42:38]
stakehde ofhe area once
[4:42:38]
it
[4:42:41]
sinalized.M, andhe
[4:42:42]
phase t this project will
[4:42:44]
n in 2027, which
[4:42:47]
incle, u an anasif
[4:42:48]
commeral and ligndustrial
[4:42:49]
lands thenther
[4:42:51]
orationf expanding
[4:42:53]
us allowances. U the
[4:42:57]
design conces and vng work andach tt
[4:42:57]
ve
[4:42:58]
done I phase one cane
[4:43:00]
incorporated into t subarea
[4:43:05]
planer pse two. Um, and I
[4:43:06]
wanted t bor
[4:43:08]
sst back toheor,
[4:43:09]
ust aug thank to
[4:43:11]
the blos hub t and the
[4:43:12]
pe tha iol in
[4:43:14]
this project. Um, they
[4:43:14]
ve
[4:43:16]
brought really creative
[4:43:18]
for communi outreac a
[4:43:20]
tions to these of
[4:43:23]
gg complex, um,stions
[4:43:25]
d lots inspiration for
[4:43:27]
sustainalind urbanesign
[4:43:29]
and ctyui metho.
[4:43:29]
So I
[4:43:30]
been fun tork with
[4:43:32]
em. And huge thank y to
[4:43:33]
at forhe
[4:43:34]
collaboration. I
[4:43:35]
ass it
[4:43:37]
to you, Madamor.
[4:43:39]
Thank y Martha. I als
[4:43:41]
cu ech your,nks
[4:43:44]
Blox h Iea enjoyed
[4:43:45]
icipatingn the first
[4:43:46]
stakeholde group. I
[4:43:48]
rely great.M, I
[4:43:48]
m very
[4:43:50]
hungry. You startedalking
[4:43:52]
ab cookies a tortillas and.
[4:43:54]
So stop.
[4:43:56]
All rilmember Pascal.
[4:44:01]
Yeah. Tha you. Thank for
[4:44:03]
for all effort thi
[4:44:05]
Maha yeah. I mean,
[4:44:07]
fun to.
[4:44:08]
S great t
[4:44:09]
see t kindfhe policy, the
[4:44:12]
mp planol come life, so to speak. Right.D of
[4:44:15]
mo that p f, u
[4:44:18]
to ileion. And le the
[4:44:19]
ma got and they mayor
[4:44:20]
got to ptin the
[4:44:23]
wosh the bub the
[4:44:24]
otommunityrs tt
[4:44:27]
participated a, ut was I
[4:44:28]
paated I aber of
[4:44:30]
shopsnd, you know, this
[4:44:32]
like tha um, theea
[4:44:34]
t was somhi different
[4:44:38]
de. Um, and, well, well
[4:44:40]
done. Soressed the team
[4:44:44]
as wel I, I jtant to
[4:44:45]
just offer support for
[4:44:47]
continue kindf pse two
[4:44:50]
efforts. I think this isng
[4:44:52]
in t r direction. And,
[4:44:55]
and,m, yeah, just spo
[4:44:58]
at I, I wte to jt ask a
[4:45:01]
questionhough,m, ofta
[4:45:03]
um, weid recve an e
[4:45:04]
fr the Planng Commission
[4:45:07]
chai Uh, romg t
[4:45:10]
re some this wk. Um,
[4:45:12]
and developme ofheubarea
[4:45:15]
plan. Uh,hi week, um, was
[4:45:16]
ingf, fromta
[4:45:18]
peive, I any o t work
[4:45:21]
ve done date b
[4:45:30]
thommendationt all?
[4:45:30]
If I.
[4:45:31]
Can.
[4:45:33]
Qn d we learn
[4:45:34]
something would allow
[4:45:35]
to m past Is thatou
[4:45:36]
question?
[4:45:36]
We,
[4:45:37]
m juston if did
[4:45:39]
we learnething through tt
[4:45:39]
wher
[4:45:41]
Staff now recme to
[4:45:43]
do what Planningomn
[4:45:45]
chair I suggesting, which is
[4:45:51]
ju noto. The subarea plan.
[4:45:52]
Adamo ahead.
[4:45:55]
Yeah,hanks. Um, yeah. We
[4:45:56]
re
[4:45:58]
still in t early s I think. I mea think one
[4:45:59]
the cll ofhi area I
[4:46:01]
Martha pointed, is tt
[4:46:01]
ther
[4:46:04]
his amazing fabric of small businesses here.Ig
[4:46:05]
And the not a lot
[4:46:07]
induri land the city.O
[4:46:08]
Ihi of the thist
[4:46:09]
we sti haven
[4:46:10]
tompletely
[4:46:15]
rstood um, the re of this, of theseustrial
[4:46:18]
zonesn the city.M, andhe
[4:46:18]
factheren
[4:46:19]
t manyf them
[4:46:23]
and ty relativy fragile Right. And I think theres
[4:46:26]
e learned ihat there are opportunities for h
[4:46:27]
he But exaly whehat
[4:46:28]
go how mucf it I tnk
[4:46:31]
is, stillom that is
[4:46:33]
to bemined. I thi,m,
[4:46:34]
know, whene getgh
[4:46:36]
th b process andtart
[4:46:39]
lking morebo pha two, there might be a option
[4:46:40]
lookternatives t a
[4:46:42]
su pn. Um, I think that there
[4:46:43]
stibably a
[4:46:44]
more exploration tha
[4:46:46]
wanto to fige out, um,
[4:46:48]
yo kow hsi fitso
[4:46:49]
th a because,in, I
[4:46:50]
our takeaway that it
[4:46:52]
really uqu place and
[4:46:53]
eess isre, as
[4:46:54]
said,ea do val
[4:47:01]
th flity. And, u and low cost of s.
[4:47:03]
Ah I guess was alwaysy
[4:47:04]
pression the subarea
[4:47:07]
planould conside and if
[4:47:09]
the a tnsver tim
[4:47:11]
Right.M, that it
[4:47:13]
s, ynow,
[4:47:16]
at it mightot stayt.
[4:47:17]
Um,ve withe of tse
[4:47:19]
changeve time, I could, it
[4:47:22]
co um,hange o to
[4:47:24]
ing mor density things
[4:47:25]
that. A what,that
[4:47:26]
frtureou be
[4:47:29]
necear to suprt that? Um,
[4:47:30]
you know, ist I
[4:47:30]
m hin
[4:47:32]
tht pnn effor
[4:47:36]
wod, uouw, evaluate.
[4:47:38]
So I just I guess I
[4:47:39]
just ait surprised to read
[4:47:41]
in thatil, u that it made
[4:47:43]
ound likee already m
[4:47:44]
a decio tt we jus target
[4:47:46]
residential to sll portions
[4:47:47]
of theub a don
[4:47:49]
ow that I just, don
[4:47:49]
t fl
[4:47:50]
like the cnc has madt
[4:47:53]
desi yet, or subarea
[4:47:56]
planas reallad that
[4:47:58]
teionr notubarea
[4:48:00]
plan, but phase o
[4:48:00]
efrt have m that
[4:48:03]
dermn. So, um, I
[4:48:03]
m jt
[4:48:04]
wondering yougr with
[4:48:08]
th or or not
[4:48:08]
Again, I tnk we
[4:48:09]
d look
[4:48:10]
councition that
[4:48:11]
suut ain I think
[4:48:12]
s probably ae more
[4:48:14]
that can be that we can bring bk to counc,
[4:48:16]
wheou can help us. You
[4:48:17]
, you can guide in tt
[4:48:20]
nextp. And wean bring
[4:48:21]
baions next te
[4:48:22]
talk aut next p of
[4:48:27]
ect, as
[4:48:28]
Okay b you don
[4:48:29]
eel like you
[4:48:30]
ve receid direction from
[4:48:32]
on that r
[4:48:33]
Correc
[4:48:34]
ank you.
[4:48:38]
Thank Councillo prim.
[4:48:40]
Yeah. It had a question on
[4:48:45]
nd the timeline forhese studies. So f this pha two
[4:48:47]
y,m, le,hat is the
[4:48:49]
approximate amount o time
[4:48:51]
willak from s toh
[4:48:53]
and then let
[4:48:54]
s justta
[4:48:54]
there.
[4:49:01]
I guess
[4:49:02]
I jumpngain. Melissa
[4:49:06]
Martha alley onewo. But, u we have it. Yh, sure w h
[4:49:07]
it. Proam for year on the
[4:49:10]
pl work p. U
[4:49:10]
agn, that
[4:49:11]
s a gross
[4:49:14]
estite I wouldm, as you know, you know, f our
[4:49:15]
rience wh station
[4:49:17]
ea plan, r we took
[4:49:18]
loerhan a yr too a big
[4:49:22]
stiola Um,h all of its attenda technic
[4:49:24]
stie So I tnk the, the
[4:49:25]
so the scalef change in
[4:49:28]
the s and mos
[4:49:30]
particular howuc housing
[4:49:31]
we e up accommoti I the
[4:49:34]
at in um, the subarea
[4:49:35]
ow much iraure is
[4:49:36]
need supporthat, I think
[4:49:37]
will be aetnt how
[4:49:39]
lo thero tes But
[4:49:39]
again, rig we
[4:49:40]
ve
[4:49:41]
heduled a y for.
[4:49:45]
It.Nd ihere a woe,
[4:49:46]
eedha up, by chance,
[4:49:48]
orik you kno guess w
[4:49:49]
ar tn factors in
[4:49:51]
termining. Sou said t
[4:49:53]
mainne of theai factors.
[4:49:55]
Is how many manyot
[4:49:56]
s you would have t
[4:49:59]
evaluate forng that cld
[4:50:00]
increa the overa timin I
[4:50:03]
theresre anythinge that could increas the tim or
[4:50:05]
ease the to be able t
[4:50:08]
finishha Two?
[4:50:09]
Ye there
[4:50:09]
hanks,
[4:50:10]
unber. T
[4:50:10]
s probably
[4:50:13]
a lot ofariables, right I think the big, rht That
[4:50:15]
that, um, you k eed
[4:50:17]
theimor the stationar
[4:50:18]
an was the technal
[4:50:19]
studshat we did support
[4:50:21]
that work,hich were really
[4:50:23]
efultu? We did
[4:50:24]
infrastrtu stues traffic
[4:50:26]
st We did aeally b
[4:50:27]
comphe emental
[4:50:28]
impact stame for
[4:50:30]
project. W developed other
[4:50:31]
ings to g alongit the
[4:50:33]
plan. S I think w we would
[4:50:35]
tyy do come to you
[4:50:36]
relativelyarly o I
[4:50:39]
process, come toil and present you wh couple o
[4:50:41]
alternatives for groh
[4:50:43]
scenars I the ze, and
[4:50:44]
yold give udance
[4:50:46]
th.Nd thene could, um,
[4:50:48]
you know, intcope of
[4:50:49]
chnical w that wou
[4:50:52]
along wh that. Um, soaybe
[4:50:54]
s a non-answe to yr
[4:50:55]
question, I think would
[4:50:56]
t you withions, se
[4:50:57]
of which lead to
[4:50:58]
shorter p, sef which
[4:50:59]
woesult in longer
[4:51:00]
ess.
[4:51:01]
L right.
[4:51:05]
Th you. T you.Ny
[4:51:19]
Deputy m.
[4:51:21]
Thanks, mor I justd to
[4:51:22]
ke sure gave m guidance,
[4:51:25]
o council or sta that
[4:51:27]
Io wanto, I.Oe the
[4:51:28]
. I like direction
[4:51:28]
we
[4:51:29]
re going want toro
[4:51:32]
wi phase two. Um, I do
[4:51:35]
recall, um, why supported
[4:51:37]
this fro the veryet go in
[4:51:38]
connectih the approva of
[4:51:40]
th c plan. Did wan us t
[4:51:41]
try toak a thoht
[4:51:45]
pr tos area. Look at
[4:51:46]
tricte, through
[4:51:48]
rict wide planning, s
[4:51:50]
if there w a way to protect
[4:51:52]
thexi lig industrial,
[4:51:54]
st se really cat
[4:51:55]
coal while
[4:52:00]
encourin um,t of innovative, um, housingn this
[4:52:02]
So Ihas the dirti
[4:52:03]
I like we
[4:52:04]
going. I
[4:52:05]
k it
[4:52:06]
s wthheestment
[4:52:09]
, uh, thoughtln
[4:52:13]
ins approach.M,ou know,
[4:52:13]
d I
[4:52:14]
m cnihe fact
[4:52:16]
that, know, rightow wh
[4:52:18]
theacomic environme,
[4:52:19]
younot we
[4:52:19]
reearing
[4:52:22]
from ders and their
[4:52:24]
rest I newro
[4:52:26]
or at lsthe kind of n
[4:52:27]
projects we would wto see
[4:52:27]
he don
[4:52:28]
t kw that if w
[4:52:32]
just expeditedpp of
[4:52:33]
us thate would get
[4:52:36]
anything like,t we
[4:52:37]
ny project or thateet
[4:52:38]
anhie the kind
[4:52:39]
projects tha we wt see in
[4:52:40]
area. So that
[4:52:41]
s I want
[4:52:42]
us to take thoughtful
[4:52:44]
approach. I aate the thoughtfulnesshat
[4:52:44]
s gonent
[4:52:46]
this, a Im willing t I
[4:52:48]
iny vote I to is not a
[4:52:49]
te, I know, but direction
[4:52:52]
is thae, uh, cen
[4:52:55]
tht of, um, deler thoughtful, u approach to
[4:52:57]
this whole distrt. Rll
[4:53:00]
want to thi be a
[4:53:02]
legacy. U for, this
[4:53:05]
council. So. You.
[4:53:11]
Thank Cnc a.Thank you,ay and thank
[4:53:14]
you. Um,tha. And planning
[4:53:18]
teamn this.M,am I
[4:53:20]
th where, u reading
[4:53:22]
block s report was the f
[4:53:23]
I seen this, it
[4:53:25]
uh,
[4:53:26]
was impressed ahe scale
[4:53:28]
their vio and h toal
[4:53:31]
about lgensformation
[4:53:32]
th a There some
[4:53:34]
uing iashat
[4:53:36]
said, um, I
[4:53:38]
not ready for
[4:53:39]
wholesale complete change
[4:53:41]
across t entirethern
[4:53:44]
industrialub a My
[4:53:45]
feedback w beo look for
[4:53:48]
options for uh, a nro
[4:53:50]
for pse two.M, it
[4:53:52]
s going to bemp t
[4:53:54]
preserve the lightustrial,
[4:53:56]
umiallyween2 and
[4:53:58]
1/. And then, asas
[4:54:00]
nt the presentio
[4:54:04]
, as w looko say, howow
[4:54:06]
w maintai for those
[4:54:08]
affordable,lexible commeia
[4:54:12]
aces?He coexist
[4:54:15]
um, are weng a some, uh,
[4:54:18]
differenteocal
[4:54:21]
that mayeppropriate for
[4:54:26]
,rtingo housing? Um.
[4:54:28]
As we l at t feedback from
[4:54:33]
Um, Aar Jacobson and Ga
[4:54:36]
medea, which I wilote, that
[4:54:38]
emailas themff
[4:54:40]
back asiduals, not as
[4:54:42]
the planning commissionir
[4:54:45]
d chair. Um, Io like
[4:54:47]
e idea o evaluatingnd
[4:54:49]
recommending areas witn this
[4:54:52]
industrial subarea that m be
[4:54:54]
apate to first on,
[4:54:57]
that mht u b an
[4:55:01]
option f scoping f phasesep on the
[4:55:04]
owed or scope.M, it
[4:55:06]
MAY make the subre plan
[4:55:10]
easier, a I MAY, um, make
[4:55:11]
thd forarketdy,
[4:55:13]
ich is also a requiremento
[4:55:15]
long needed. Soe want to
[4:55:16]
look at thosecular
[4:55:19]
options. And finally I
[4:55:20]
unrs one o the
[4:55:21]
steh groups actuallyad
[4:55:25]
inventoryf bin in
[4:55:28]
the Um, I t that
[4:55:30]
some importanfon to
[4:55:33]
I know several of the
[4:55:35]
am thater mentioned. I
[4:55:36]
am awa of there others
[4:55:38]
at I mayot haveusro
[4:55:41]
, um, walking the
[4:55:42]
coid and, and being I t
[4:55:43]
neighborhond wouldiko
[4:55:47]
lookts in a, um, detaid
[4:55:48]
omprehensiveanner. Thank
[4:55:49]
you.
[4:55:51]
Than.
[4:55:59]
Anyone?Kay. Firstuty
[4:56:03]
r. D mor are you
[4:56:04]
g your hand?
[4:56:07]
I did,h. Und I
[4:56:09]
apologizeor intruou.
[4:56:10]
Yo certainly feelelcome
[4:56:11]
make yourks. Was
[4:56:14]
jung to highlig that a
[4:56:16]
ld to u Uh,nk
[4:56:20]
th I of those es where weay not be givin
[4:56:22]
staff as clear directi as we
[4:56:24]
to. A so I do think
[4:56:26]
queson have for s is,
[4:56:27]
whetherhey
[4:56:27]
ve gottet
[4:56:30]
theyea need from I feel likehe
[4:56:31]
s a we
[4:56:31]
re
[4:56:33]
little bit overhe not
[4:56:34]
all over t but
[4:56:34]
re a
[4:56:35]
tt,h, we
[4:56:35]
veov
[4:56:37]
so try o the map in
[4:56:41]
feedback
[4:56:43]
Um city m, I s your
[4:56:46]
Well,t soea quick.
[4:56:49]
Think, yes, in aen that,
[4:56:50]
um, w
[4:56:51]
going to cek
[4:56:53]
with o aut how the 2
[4:56:56]
ud go ah, options
[4:56:58]
that thenhencil can evaluate t asohich
[4:56:59]
direio you want t with
[4:57:00]
eack that yeive.
[4:57:01]
T there
[4:57:04]
s changen wt
[4:57:05]
the languageays y. And
[4:57:05]
ther
[4:57:09]
o change in idea that we need come bac 27
[4:57:10]
to lookt sub area. But
[4:57:12]
think someas on this in
[4:57:13]
thpe that we cldring
[4:57:14]
u optionsoull
[4:57:15]
un could disss and
[4:57:17]
bate and did upon in
[4:57:20]
ugh the pg work program. That
[4:57:20]
shas how I
[4:57:21]
int.
[4:57:22]
It.
[4:57:24]
Grs longsff is
[4:57:26]
tting what the I
[4:57:26]
That
[4:57:29]
sre Thank.
[4:57:30]
Unber f
[4:57:31]
Thank y,am Mayor. I
[4:57:31]
wasn
[4:57:33]
oing to speak, but, um,
[4:57:34]
ey mayors aoo
[4:57:35]
point, so I j wantedo
[4:57:37]
share one of m thoughtsha
[4:57:39]
MAY be h forffn the
[4:57:41]
direio isha I support
[4:57:41]
Counlm Arnold
[4:57:42]
s,m,
[4:57:44]
thouts on seeingfre
[4:57:46]
wa break thio smaller
[4:57:48]
parts, to be efficient in
[4:57:50]
the work. A plusne
[4:57:53]
to thaase
[4:57:56]
Thankou Anyone?Oi
[4:58:01]
ce. Gng twice All r
[4:58:04]
ha, good j. Um, I reay
[4:58:07]
appriahtfulness
[4:58:09]
thatenehind t I really
[4:58:11]
apprecte work that
[4:58:13]
eryone into rch out
[4:58:15]
to the existin businse and
[4:58:16]
g theirut. I
[4:58:16]
th
[4:58:18]
s super impta
[4:58:18]
it
[4:58:19]
something usually
[4:58:20]
do. What
[4:58:21]
s reallylear
[4:58:23]
about this I this is very
[4:58:26]
ique a This is unlik
[4:58:28]
anything elsehat we h
[4:58:31]
wi the cy. Um, both in,
[4:58:33]
um, where it ridhin t
[4:58:36]
Totem l Regiona Center. And
[4:58:38]
um,he kinds businesses
[4:58:42]
in. So am interested
[4:58:44]
in, um, cutting thip in
[4:58:45]
le pieces. I thinkt
[4:58:47]
re importa tt we d
[4:58:49]
this stratic and
[4:58:51]
thoughtfully and lookt
[4:58:53]
holiic I tt the
[4:58:54]
pocy tt was in
[4:58:57]
compreheiv planasl
[4:59:02]
.Nd I support s with the polynd doing the
[4:59:05]
rkesign this area. That
[4:59:07]
wi becomey speal So
[4:59:08]
thank for.
[4:59:14]
Anyone else?All right. T youa.
[4:59:15]
Thank you Am. Thank
[4:59:17]
Alon You MAY now home and
[4:59:20]
go bed.Op you
[4:59:20]
ll
[4:59:22]
ve very faro go.Y.
[4:59:26]
Council, it is107 ande have
[4:59:27]
uncil poliend
[4:59:29]
procedur. And also have
[4:59:33]
three lr MS.. S sge
[4:59:36]
is that w delay nin f c
[4:59:38]
licy procedures to later
[4:59:40]
meeting a g ahead and
[4:59:43]
reports a the Ls.
[4:59:46]
Anytionso that. Tmb
[4:59:47]
upnkou Councilmember
[4:59:51]
ld. Council member t.
[4:59:53]
Thumbs upilmember
[4:59:54]
Primm.
[4:59:55]
I don
[4:59:57]
tbj I have
[4:59:59]
policies and produ
[4:59:59]
ents tt
[4:59:59]
ll be
[5:00:01]
ng at the nt meeting.
[5:00:07]
So Io want to are the issue a some pointnkAll right. Do I a
[5:00:10]
ump fromrybody?Ka
[5:00:12]
willone nine f a
[5:00:12]
we
[5:00:14]
llide, u figureut
[5:00:15]
when it c be on the c
[5:00:18]
lendargain. We are
[5:00:22]
to mntil reports.
[5:00:24]
And I will starth depy
[5:00:25]
ma and l keep tm
[5:00:27]
short,ol.
[5:00:31]
Okay?Um,ustui note that, uh,
[5:00:32]
ayor andot to visit
[5:00:34]
the Sou County Recycling and
[5:00:39]
an station Algona. Uh, las Friday. I to
[5:00:41]
th tff of the cit and
[5:00:43]
of the c fort tour.
[5:00:44]
Um it
[5:00:50]
theatest, ut, um, advance v o a
[5:00:51]
recyclg and trafe station
[5:00:51]
to theou
[5:00:53]
s built. S
[5:00:55]
that was reay informative.
[5:00:57]
Um, I wantedoighlight that.
[5:00:58]
Xt Wednesday, I
[5:00:59]
oing to
[5:01:03]
, um,ending a convening
[5:01:05]
Cll Snd
[5:01:07]
Greareattle Ps, um,
[5:01:09]
to dcu sortfnomic
[5:01:12]
developmen priorits with
[5:01:14]
rs. Uh, theay was invited. She
[5:01:15]
unable to
[5:01:16]
tend. Sot want m
[5:01:17]
colleagues t I
[5:01:17]
m going
[5:01:19]
be, uh, attendingha inhe
[5:01:20]
mayor
[5:01:23]
s stead. Um, really
[5:01:24]
enjoyed Nio Night last
[5:01:26]
ght. Um, a you all
[5:01:29]
of the firstesponders.
[5:01:31]
Um, and the communityot
[5:01:33]
ord uh, block
[5:01:35]
parties and, again of
[5:01:36]
co the f responders
[5:01:37]
that tk out, and
[5:01:39]
rticularly who, uh,
[5:01:44]
e us aun. And then, um,
[5:01:47]
do there a jnt
[5:01:52]
on share eity um, council mbe uh, Pascal,
[5:01:54]
Council m Arnold and I
[5:01:54]
going to pse I
[5:01:55]
m going to
[5:01:57]
that to council member
[5:02:00]
Pascal or, uh, Arnd t
[5:02:03]
presen during tir council reports. Tt it.
[5:02:06]
Um, l happen during
[5:02:07]
na repor.Ot council
[5:02:08]
reports.
[5:02:08]
Soy.
[5:02:10]
Ll leaveo them
[5:02:11]
bring I u during cit manager
[5:02:12]
reports.
[5:02:14]
An you,oumberas.
[5:02:18]
, I d have anythin to
[5:02:19]
thatant be repte
[5:02:20]
viil. Thaou.
[5:02:21]
Thank.
[5:02:23]
Coci Falcon.
[5:02:24]
Thank Yeah.Ce it
[5:02:24]
late, I
[5:02:25]
mnloing to menti
[5:02:28]
one tng Um. And thas. Thank you t everyone
[5:02:30]
me to w theng
[5:02:31]
young ale at ts week
[5:02:33]
League Stb World
[5:02:34]
Seriesnd Evere Park.
[5:02:36]
been f. I know I
[5:02:36]
een
[5:02:39]
outhery day. Um, know
[5:02:40]
I s u Deputy Cy Manager
[5:02:42]
Lopez out there. I know that
[5:02:43]
Councilorold
[5:02:43]
see out
[5:02:44]
the. If you hav been
[5:02:46]
there, definity che it
[5:02:46]
out.T
[5:02:48]
s so much f There
[5:02:50]
a lot ofre energy, a the
[5:02:51]
games r through Satury
[5:02:53]
rnThank y.
[5:02:56]
Thank y.Ncillor Primm.
[5:02:57]
Yeah. Nhi to r I
[5:02:59]
sending an email.
[5:02:59]
Than y
[5:03:01]
Thank y Custome a
[5:03:02]
No ror
[5:03:03]
Counl member t Chisholm.
[5:03:04]
Noep
[5:03:05]
Th you.
[5:03:07]
Um. Myeport willend. B
[5:03:09]
I dt to tak moment
[5:03:11]
thank cityff everyone
[5:03:12]
that wordehind tnes
[5:03:13]
e sureha this meeng
[5:03:16]
wemoothly. Um, really,
[5:03:19]
re appreciate it.O thank you, everyone. City m,
[5:03:21]
m handing I over you.
[5:03:22]
Ay.
[5:03:23]
You. I have one short
[5:03:24]
te and t I
[5:03:24]
ll call f
[5:03:27]
the calendar and Lue
[5:03:30]
The sho update. Um, think
[5:03:31]
u MAY all kno we a now
[5:03:35]
rt a municipal city jail caucus. That c out of
[5:03:37]
legislative aion
[5:03:38]
that ccu we ourselv
[5:03:39]
in theea of being
[5:03:42]
convenersndpbell, our
[5:03:43]
affairser, has b
[5:03:45]
leading Wead meeting
[5:03:49]
Roger g t discuss the idea a a group cities
[5:03:50]
meter standar for the
[5:03:51]
jail operatis.Ou they
[5:03:54]
t, uh, sortf a saf harbor
[5:03:56]
from, lawit especially
[5:03:57]
if there
[5:03:58]
sies o in
[5:04:00]
ail a sols are
[5:04:02]
facingasically eion. I
[5:04:03]
you have one event,
[5:04:04]
could loslionsfollars
[5:04:05]
ettlement. Just wan
[5:04:07]
let you kw since t legislature has been a to be
[5:04:09]
rthis, yet we met wh
[5:04:11]
Roger Goodm and his
[5:04:12]
gg was t with
[5:04:13]
Se Manka Dhingra,ho
[5:04:14]
e of the Senate
[5:04:14]
mmittee. We d that
[5:04:17]
yey, a several ohe
[5:04:18]
mayors fro the cities
[5:04:19]
ther aell ass. It
[5:04:20]
s a
[5:04:22]
really great m.He told
[5:04:23]
us that s would beil to
[5:04:25]
tey sponsor mail I
[5:04:28]
met hameters, which she laid out.Utm, on all o
[5:04:29]
your behf, on bal of our
[5:04:31]
rrectionsept, oths,
[5:04:31]
we
[5:04:33]
ak somrogress o
[5:04:34]
this issue I just wanou
[5:04:34]
all kw it, becauset
[5:04:36]
s kind of hapni outde of
[5:04:37]
ormal lis
[5:04:38]
oup process. But w a
[5:04:39]
rely meeting with t
[5:04:40]
senator.
[5:04:41]
So.
[5:04:43]
Much much more t
[5:04:45]
Come.
[5:04:46]
Al. So nextor the
[5:04:48]
lend I kno have a
[5:04:49]
coegislativest
[5:04:50]
s. The attorney
[5:04:52]
office has bnd enougho
[5:04:53]
put them slides for us
[5:04:55]
all. Um, so wid I
[5:04:55]
min
[5:04:57]
in the a teceive them, so
[5:04:57]
ss I
[5:04:58]
ll just, uh, left the
[5:04:59]
un to see wts to
[5:05:01]
he motiono the the
[5:05:02]
air sw.
[5:05:08]
So. Councilmember Pascal.
[5:05:11]
Than, Madamaym,o
[5:05:13]
ju a liteit oft quick
[5:05:14]
backgrou for tse that might
[5:05:19]
be watching. Um, I think several of uepproached,
[5:05:22]
um, s timego by
[5:05:25]
represta o lime. U
[5:05:26]
an indicatingha they,
[5:05:28]
re in our ang
[5:05:29]
cities. Um, a agencies
[5:05:31]
surrounding Kirkland. Uh,
[5:05:33]
Bothell,dinville, Redmond
[5:05:34]
and n are just sg a
[5:05:37]
program Bellevue and, uh,
[5:05:40]
it, you know,aying now
[5:05:41]
Kirkland iind ofn a dut
[5:05:43]
le right. Soy
[5:05:43]
d like
[5:05:46]
to startversations with u
[5:05:48]
aboutntngromobility
[5:05:50]
onso ourit And
[5:05:51]
heyol tha with
[5:05:53]
ter to council, I
[5:05:54]
liesterdayr the day
[5:05:56]
before,ith theerest.
[5:05:59]
And sed un thatr,
[5:06:00]
hat officl letterm
[5:06:03]
, uh, f lik it
[5:06:05]
pr talki with, um,
[5:06:07]
mayor,h, Black and
[5:06:09]
Cocir Aol I
[5:06:09]
like it
[5:06:12]
dent to, uh,h,
[5:06:15]
ferrm soha we canook
[5:06:16]
at thision. This
[5:06:17]
oval ot. It
[5:06:18]
s jt look
[5:06:19]
xplore o oow we
[5:06:21]
consider micromobility
[5:06:23]
progra in in Kd. We
[5:06:27]
that, um, e-bike safety,
[5:06:29]
uh,as been a bigrsation
[5:06:30]
cty, not j in
[5:06:32]
Ki, but across the rio
[5:06:35]
ante. That toe,
[5:06:36]
u know, continue to be pt
[5:06:38]
of, y kny oio a
[5:06:40]
uation that tte look
[5:06:43]
at. Um, so wit that, I
[5:06:43]
ll me
[5:06:44]
a motion we canav
[5:06:47]
sc.M,ot for
[5:06:48]
Council approve
[5:06:49]
legislativ requestemo asking
[5:06:51]
the city m toxp
[5:06:52]
tions forowinghe shared
[5:06:54]
omobility progr,
[5:06:57]
inudcooters, g and e-bikes such ahe one
[5:06:59]
erated bime withinhe
[5:07:00]
cityith correon
[5:07:02]
attentiono rider a
[5:07:03]
commit safet.
[5:07:04]
Second.
[5:07:07]
Second. Wow.
[5:07:08]
I don
[5:07:09]
w who ttas. I
[5:07:10]
going to giv I to black just
[5:07:12]
be he was loudest. Uh,
[5:07:14]
moti bee madey
[5:07:16]
Councilmbe Pecondy
[5:07:18]
Deputyayor. U any
[5:07:25]
sc? Those favor,
[5:07:28]
ease say a.
[5:07:30]
Y oppos?
[5:07:35]
Moti carries seveno. Thank y. Genem
[5:07:39]
riext
[5:07:43]
Okay. It toivome
[5:07:44]
backou on thio I
[5:07:47]
proposg t lrm toxplore
[5:07:49]
helmetequirements forh
[5:07:51]
speedro mobility dic
[5:07:54]
such e-bikes. Becse our
[5:07:55]
sponsibility isea to
[5:07:57]
otectcy,
[5:07:59]
especially fur children a
[5:08:02]
en u e-bikes are, as
[5:08:04]
everyo knows, eik a
[5:08:05]
becoming vy commonn our
[5:08:08]
mm and the datas
[5:08:14]
ng quitey,h,mi 2026 natiol anasi by
[5:08:16]
Truvada, which is very
[5:08:18]
gitimateat dataet
[5:08:21]
go by USajor u
[5:08:22]
he syste across the
[5:08:24]
countround that emergcy
[5:08:25]
visits for e-bik and
[5:08:27]
e-scooter injuriesng
[5:08:28]
dren adosc
[5:08:32]
increased by71% between
[5:08:35]
Januy of Mayf
[5:08:38]
2026, and many, really
[5:08:40]
is the lackf helmets t
[5:08:42]
us these injuries. As an
[5:08:45]
ample,me 2020,5
[5:08:47]
JUNE 2026, a majoros
[5:08:51]
in Texas treated 127 pic
[5:08:54]
patients, out o which 99 of
[5:08:56]
th and this w form
[5:08:58]
be on injie cause by
[5:09:03]
bicyclesr e-bikes or e-scooters. 78% o them were
[5:09:05]
wearing helmets, so I
[5:09:08]
undersnd you kw,mets definitely cno prevent every
[5:09:11]
ry. But I dohink that that
[5:09:12]
s theim a most
[5:09:14]
effective for u to ruc
[5:09:16]
the risk of potential hea
[5:09:17]
in. Therefo, I don
[5:09:20]
think this isot like a
[5:09:21]
re t g approval for
[5:09:23]
is, but reay tore
[5:09:25]
options on wth or not ts
[5:09:27]
is somethi we cld the
[5:09:31]
of Kirano I move
[5:09:33]
the approve legislative
[5:09:34]
quest mo askin staff to
[5:09:36]
prid options for rui
[5:09:38]
the use ofik helmets when
[5:09:40]
erating micromobility
[5:09:43]
viic e-bikes,
[5:09:46]
ooters, etc. In Kirkland.
[5:09:48]
Cond.
[5:09:51]
All right, I heard Councilmember Timolm o
[5:09:51]
the secd. So
[5:09:52]
s been m
[5:09:54]
byilmemberrimm.D,
[5:09:55]
ncilmember Timolm
[5:09:57]
to move f.He helmet
[5:10:01]
m. Is t any dion?
[5:10:04]
Deputy Mor.
[5:10:07]
St o quick cme Um,
[5:10:08]
alreciate,h,
[5:10:09]
Councilmemr Prem bg
[5:10:13]
orward.,h, it is a
[5:10:16]
pi tt was discuedy me
[5:10:17]
and Councilmb Aol and
[5:10:18]
cilmember Pascal in
[5:10:21]
nn with the e t
[5:10:23]
shared Emobility asel
[5:10:26]
Just justw that,m, we
[5:10:29]
were thinkin thisic too, and onef reasons
[5:10:31]
wo that tay we
[5:10:34]
wereopha thatight,
[5:10:36]
thatRMight come
[5:10:38]
back withom suggestions for
[5:10:39]
e might look helmets
[5:10:41]
to. Bhi is t more this
[5:10:43]
he clearer aore direct
[5:10:44]
way too it. And Ihink it
[5:10:46]
s a ton ose. And
[5:10:48]
going toup it.
[5:10:51]
K y, CouncilmemberJohnson.
[5:10:52]
ll support I supporthis
[5:10:53]
m. Ihi one of the
[5:10:57]
interestin legal questions that will e is aiv
[5:10:59]
infrti non-crimil
[5:11:00]
vi infraction is I
[5:11:02]
r tha civilnfraction
[5:11:04]
is I the rid or t
[5:11:07]
parents. Thankou
[5:11:10]
you. Cncerd.
[5:11:14]
Um, jus quickment
[5:11:17]
generally on Lems. We
[5:11:19]
been prettypen to t bau
[5:11:20]
it
[5:11:21]
j startin the
[5:11:24]
nversation. But h
[5:11:28]
and wle u therehould be no argument abo wring a
[5:11:29]
helmet,ea ael when
[5:11:31]
reid bicycle,
[5:11:37]
e-bi, e-scooter e., the question o rui this and
[5:11:39]
fo and thiset
[5:11:40]
veryomed,er fast.
[5:11:44]
And Imious ofta
[5:11:46]
city even inking at
[5:11:50]
this for an. And s
[5:11:51]
while I t I
[5:11:52]
important
[5:11:53]
ise, I
[5:11:54]
not suret
[5:11:54]
s one
[5:11:55]
that I
[5:11:56]
supportive of.Ov
[5:11:59]
ediately. A son the
[5:12:00]
in of prioriz I
[5:12:02]
ing to be voting against
[5:12:05]
this.Ut pleas evebo o
[5:12:06]
there, paren outhe mak
[5:12:07]
sure you
[5:12:08]
helmets. I
[5:12:09]
m j not sure
[5:12:10]
about cityction at
[5:12:11]
point.
[5:12:13]
You. Tha you.
[5:12:16]
Anyone else? Rig.
[5:12:17]
Questis on theotoove
[5:12:20]
rw The helmet lrm made by
[5:12:21]
lmember Pm, secondy
[5:12:23]
Cocir Tim Chisholm.
[5:12:25]
Thn favor,e sayye
[5:12:26]
Ay
[5:12:29]
All opposed? No. Motion
[5:12:33]
carries one
[5:12:35]
l right.Holmes, p orl
[5:12:37]
uncilmember.Me.
[5:12:38]
Thank y, Mayor Um,
[5:12:40]
this is since Councilmember
[5:12:41]
Pasc, u ped tther
[5:12:43]
ld. I hope he dsnt
[5:12:44]
mind I I p ts one jus
[5:12:47]
to the wkl Um,
[5:12:48]
is aoi prose l by
[5:12:50]
Councilmemberlnd I.
[5:12:51]
Won
[5:12:52]
t go muchail aut
[5:12:52]
it, because Ihi we
[5:12:53]
re all
[5:12:54]
fairly familr with t
[5:12:58]
issues. Um,he tres two issues in herou
[5:12:59]
ve probabl
[5:13:01]
allea the language, but just for those, uh, watin at
[5:13:04]
me, um, what theyot relate
[5:13:05]
to the Hols Point oveay
[5:13:07]
is aar o the
[5:13:09]
orhood tn Hill neighborhood. Rht It
[5:13:10]
s,m,
[5:13:11]
a portion of Finn Hil
[5:13:13]
neighborhood forho who MAY
[5:13:15]
be familia Um, the
[5:13:16]
two, um, there there a
[5:13:19]
stctul whi the
[5:13:20]
Ho Point orl aut
[5:13:22]
property usage aelopment.
[5:13:24]
So these to are
[5:13:25]
mehe issuest we
[5:13:25]
ve
[5:13:28]
been hearing rdly from,
[5:13:29]
ommunityem tha live
[5:13:30]
the Holmesoint
[5:13:33]
neigor Finnl.H,
[5:13:34]
the fir is I
[5:13:36]
ve b this up, younoeralim
[5:13:38]
over the pew years since
[5:13:40]
ve adopted the, um, our n
[5:13:42]
tree cod And thats allowin
[5:13:43]
so m flexibility fore
[5:13:46]
reva foromsn the
[5:13:47]
Hoes Point nghd.
[5:13:48]
The areks w I
[5:13:49]
ve heard
[5:13:51]
from w iur lot of
[5:13:55]
traor and, um, and expense
[5:13:57]
cause tes tha, you
[5:13:59]
ow, u damaging their home
[5:14:00]
or havg, you know,er
[5:14:01]
es. But t trees a
[5:14:02]
healthy. A they
[5:14:02]
re
[5:14:03]
tly not alled to remove
[5:14:04]
them in tmes Point
[5:14:06]
overlay. The do not h the
[5:14:08]
abily to remov either 2 or 4
[5:14:11]
, le, um, prort
[5:14:12]
do in the rest the
[5:14:14]
ty So like for u
[5:14:15]
look ations f more
[5:14:16]
flityre. Or we
[5:14:18]
d like to look at that. And second
[5:14:21]
isated to covag and
[5:14:22]
lot splitting I think
[5:14:23]
re
[5:14:24]
all least, ynow,
[5:14:26]
somewhat familiar with
[5:14:27]
Ho point oveay beinge
[5:14:28]
restriiv in ts. And
[5:14:30]
ntially t larger the lot
[5:14:33]
that you h u higher.
[5:14:36]
Um uh,r the, t, the ls
[5:14:36]
lotov you
[5:14:37]
a,
[5:14:38]
righ o largerros. S
[5:14:39]
for propertie that already
[5:14:41]
have ansting that m
[5:14:42]
be a largee, evenf they
[5:14:44]
ha very lgeroperty, are
[5:14:45]
allowed to sit that l
[5:14:47]
in oer to facit a
[5:14:49]
reesly needed.
[5:14:50]
Using development in
[5:14:52]
community. Um,nd thi targets
[5:14:56]
specifically flity in those caseshemes Point
[5:14:58]
overlay for missing middle
[5:15:00]
housing,se we that that
[5:15:01]
s what need tn,
[5:15:03]
youno bigansions
[5:15:04]
e see evewh it
[5:15:06]
very targete specificay at
[5:15:08]
looking at ways that w could
[5:15:10]
ore flexibl withowing,
[5:15:11]
um, missingiddle houng and
[5:15:13]
loittingner to,m,
[5:15:15]
to a tha happen I the
[5:15:18]
lmes Pointrlay. S Iill
[5:15:20]
mahe motion move to
[5:15:22]
prn lrm to explore
[5:15:24]
opon for two pal c
[5:15:25]
amenen relatedo the
[5:15:27]
lmoint orl The first
[5:15:28]
would involvexpanding the
[5:15:32]
abit to remov trees in the Holmes Poi overlayside
[5:15:34]
of development scenaos for
[5:15:35]
inan incas t
[5:15:37]
ability remove trees
[5:15:38]
bett with aces in
[5:15:41]
tht of theitre a property oer canen
[5:15:44]
re t 4es yr
[5:15:45]
depending o sizef
[5:15:47]
property The seconde
[5:15:48]
amdm would iol
[5:15:49]
loen one or more
[5:15:51]
velopmentards inhe
[5:15:52]
Holmes pnt overlay
[5:15:54]
fate tevelopment of
[5:15:56]
middle houng Theptions
[5:15:57]
that are expreo consider
[5:15:59]
whether thesemendments can be
[5:16:01]
integrated int ps
[5:16:03]
are curnt on t to
[5:16:06]
2028 planning workrogram
[5:16:09]
cond.
[5:16:09]
Thank. It
[5:16:10]
s bee by
[5:16:11]
uncilmember f Second b
[5:16:13]
Councilorcal t move
[5:16:14]
d. The Holmes point
[5:16:16]
overlay lrm Councilmember
[5:16:19]
Pa.
[5:16:20]
Thank you Councilmember
[5:16:22]
Franin did are job of
[5:16:23]
explaini that, um,he only
[5:16:25]
couple this just wt to
[5:16:27]
ad o emphasize is thathe
[5:16:29]
gs are iue that w
[5:16:30]
hear fromheommunity
[5:16:31]
members. These aren
[5:16:33]
just
[5:16:34]
s b of us c up
[5:16:36]
th, butse arehi
[5:16:37]
sationst I
[5:16:37]
ve bee
[5:16:39]
having,m, over tears. I
[5:16:39]
sure you
[5:16:41]
rd, too,rom
[5:16:42]
communityrs aut
[5:16:44]
th.Hen second, we were
[5:16:46]
very sci withff that
[5:16:48]
we wanted these te very
[5:16:51]
rgeted. Um,nd rll wan
[5:16:51]
tond that
[5:16:52]
s whyha last
[5:16:56]
ence is t is try to find a w to see if wre
[5:16:58]
rg c they b added
[5:17:01]
anxi wk program item rather than cg a whole
[5:17:05]
anotr set of wor for the planning departmen Becausee
[5:17:05]
know that t
[5:17:06]
re stretched
[5:17:07]
thin, that t
[5:17:08]
s a lot o different priorie And
[5:17:10]
wantedo basically just kind
[5:17:15]
of appd on to aning process. Um, ao that
[5:17:16]
hope tttaff wil at
[5:17:17]
at see wtould behe
[5:17:20]
appropriate way of csi
[5:17:22]
these ameme
[5:17:23]
Than.
[5:17:24]
Than you.
[5:17:26]
Anyone?
[5:17:29]
I doppreciateha you
[5:17:30]
regn the potential impact
[5:17:32]
toheing workgram.
[5:17:33]
Thout was a ne addo
[5:17:36]
e thank you fort.
[5:17:39]
Um, a further discussion? All
[5:17:41]
thosen, pleas say aye.
[5:17:46]
Anyed? Motn carri
[5:17:49]
seno. All. Well
[5:17:51]
done erym.
[5:17:53]
Ma Anyin elsem?
[5:17:58]
Yore m
[5:17:59]
felt very goo just
[5:18:00]
to say w reschedule the
[5:18:02]
cil policies and produ
[5:18:04]
dion. Arehe any oth
[5:18:05]
calend changes from the
[5:18:10]
councileforeeh All
[5:18:11]
right. So now want to
[5:18:13]
d my thanks the it sff
[5:18:13]
an clerk
[5:18:15]
se teamnd
[5:18:17]
everne madehis virtual
[5:18:18]
meeting g well. And huge
[5:18:19]
to the council members
[5:18:21]
r your flexibili andou
[5:18:22]
patiences we dt. Andou
[5:18:23]
guys did great.
[5:18:24]
Jo.
[5:18:26]
Soha you.Nk y
[5:18:29]
everyone. Enjoy yr recess and