Good afternoon and welcome to our May Heritage Kitchener meeting. This afternoon we're pleased
[0:45]
to have with us our reps who are going to talk about Victoria Park. And I just encourage
[0:57]
everyone that, you know, if you have questions, we know the rules and how we do our reports
[1:09]
and so on and so forth. So, again, for the audience, people interested
[1:16]
in participating in future meetings can register online using the Delegation Registration
[1:24]
form www.kitchener.ca delegation or via email at delegation at kitchener.ca.
[1:35]
So first item of business, we would like to know if anybody has a disclosure of pecuniary
[1:44]
interest and the general nature thereof.
[1:47]
of. So are there any pecuniary interest? Seeing none, we'll proceed to the delegation.
[1:59]
And
[2:00]
what we're going to do is go straight to this presentation on Victoria Park. And you have
[2:13]
as your agenda item, Heritage Consultation Memo for Victoria Park Master Plan.
[2:21]
And we have two of our staff who are going to present because they've both been involved
[2:30]
in this item.
[2:32]
We have Michelle Drake, our Senior Heritage Planner, and Karen Lisa, Landscape Architect.
[2:41]
So each of them will present, and we do have a five-minute presentation.
[2:48]
However, I would think that this item may take longer than the five minutes.
[2:55]
And since we don't have a long agenda, I will open it up,
[3:01]
and you do what you have to do to present.
[3:06]
All right.
[3:07]
So, Michelle, are you going to present first?
[3:12]
We're going to present together.
[3:18]
Karen and Melissa and Michelle, please.
[3:28]
Thank you, Jean, for that introduction.
[3:30]
So both myself and Ms. Lizard are here tonight to talk about the Victoria Park Master Plan
[3:39]
and the Heritage Review that was undertaken by the firm of Archaeological Services Inc.
[3:47]
ASI. The purpose of our presentation today is to not walk you through every single recommendation
[3:56]
of the Draft Master Plan but rather to sort of highlight the theme areas and the findings
[4:04]
as they relate to heritage with respect to ongoing work with the overall Victoria Park
[4:12]
master plan review process.
[4:20]
So as I mentioned, ASI was retained to assess how
[4:26]
the draft Victoria Park Master Plan recommendations aligned with, as you know,
[4:33]
the Victoria Park Area Heritage Conservation District Plan policies and
[4:37]
guidelines. The review identified a few different things. One being, or I guess
[4:45]
the purpose story of the review was to identify if there were any potential conflicts, but
[4:50]
it also identified and looked at opportunities where we may be able to strengthen the heritage
[4:56]
character that we see in Victoria Park today and in the broader Heritage Conservation District
[5:01]
throughout the process.
[5:08]
In terms of context, this committee should be fairly familiar that Victoria Park is
[5:14]
the city's oldest park. It was established in the 1890s and forms a central feature within
[5:21]
the Victoria Park Area Heritage Conservation District. The plan that applies in that district
[5:28]
identifies the park as a romantic landscape and then it mentions that it's characterized
[5:34]
by things like the naturalistic forms, the meandering pathways, wooded areas, open
[5:41]
lawns, framed vistas, and then it mentions the lake as a focal point within the park
[5:48]
and the district.
[5:53]
I'm going to turn it over to Karen for now.
[6:03]
All good?
[6:03]
Okay.
[6:04]
Thanks, Michelle.
[6:06]
Good afternoon.
[6:07]
Thank you for taking the time to hear about the master plan and the progress we've made
[6:12]
since we last met in November of 2025.
[6:16]
I just wanted to bring some additional information to the committee in terms of the recommendations
[6:23]
that we've brought forth and how it relates to what Michelle had just mentioned about
[6:28]
the Heritage Review.
[6:30]
As far as the process for the project, since we last met, we were working through draft
[6:37]
recommendations.
[6:38]
So we'd finalized phase one and phase two, and we were validating all the data we
[6:44]
had collected from those two phases and drafting recommendations based on capital, policy and
[6:50]
strategic initiatives. We worked through an internal stakeholder process where we verified
[6:58]
that information and basically circled back to those folks in our working group and made
[7:03]
sure that we weren't missing anything. And then we're looking at a prioritization of
[7:07]
those recommendations. So in terms of the internal stakeholder verification, we worked
[7:16]
through, like I mentioned, the internal working group, but also feedback from our CLT, our
[7:24]
corporate leadership team. And then, as Michelle mentioned, we jointly retained ASI to look
[7:32]
at the overall recommendations and are here today for our second update.
[7:38]
And concurrently are working on the document in the background just to make sure that we
[7:42]
meet our June 1st deadline for council.
[7:45]
Next slide.
[7:47]
So in terms of the internal stakeholder verification, that was in March that we went individually
[7:54]
to heritage planning staff, economic development, our parks operations staff, as well as transportation.
[8:02]
Those four were sort of key groups that we had heard from in our engagement process that
[8:09]
had a lot of input when it came to some of those recommendations, and we wanted to make
[8:14]
sure that what we were presenting aligned with staff's thoughts and strategic goals
[8:21]
as well. And then CLT came in April where we confirmed support and or revisions to some
[8:28]
of those recommendations, keeping in mind that the 43 recommendations that we presented
[8:35]
in our memo to this committee as well as to ASI have since been refined. But we will
[8:42]
move forward with the original list that we had presented just so we can have that
[8:47]
discussion if there's any specific questions. And then, again, in April, we were working
[8:52]
with ASI to make sure that we had that reference point for committee today. Next slide.
[9:00]
So as I mentioned, the 43 original recommendations, there was 25 capital, nine strategic, and
[9:08]
nine policy. Of those, they're covered under the topics to the right. I know that's
[9:13]
kind of small text but it gives you an understanding of the depth of the engagement and the feedback
[9:20]
we received last year and how we sort of grouped those topics and moved forward in providing
[9:28]
recommendations that align with what we heard internally and externally from the public.
[9:35]
Next slide.
[9:38]
I guess I'll pass it back to Michelle.
[9:40]
So,
[9:45]
in terms of the overall findings, what ASI reported back to us was that the majority
[9:51]
of the draft recommendations found in the draft Victoria Park Master Plan were not inherently
[9:58]
in conflict with the policies that this committee is familiar with within the Victoria Park
[10:04]
Area Heritage Conservation District Plan.
[10:07]
many of the recommendations actually present opportunities where we may be
[10:14]
able to restore and or improve and enhance the character within the park in
[10:21]
the broader district. The primary risk that they did share was the idea of
[10:27]
like cumulative impact so the idea that if there are numerous small and or
[10:34]
or uncoordinated changes in the park,
[10:37]
that their collective impact could be a concern,
[10:42]
and specifically with respect to the idea
[10:46]
of cumulative visual clutter.
[10:53]
So some of the key considerations that were outlined
[10:56]
were related to focusing on protecting the Victoria Park
[11:01]
in terms of its landscape elements.
[11:04]
So looking at maintaining views to,
[11:06]
from and around the lake preserving the open grassy sweeps such as the commons
[11:14]
and the meadow retaining the wooded areas and then protecting the important
[11:20]
vistas. Also of interest is the pathways where we would like to continue to see
[11:26]
them meandering in their alignment instead of being perhaps you know
[11:31]
straightened or hard angles, and ideally not
[11:35]
over widening of the pathways as they exist today,
[11:39]
and where new structures may be proposed,
[11:42]
that there be thoughtful consideration to the need
[11:46]
and then careful consideration of the appropriate location
[11:50]
for those new structures.
[11:57]
And so with respect to some of the details
[12:00]
around these changes, the guidance emphasized compatibility rather than a
[12:08]
replication of historic styles. So looking at new or replacement elements that
[12:16]
are high quality, natural materials, muted tones, historically appropriate tones
[12:23]
like those suggested in the Heritage Conservation District Plan, and gave
[12:28]
these examples of like park furniture and signage looking to sort of coordinate how their design
[12:35]
happens and vegetation strategies that can also help us reinforce that romantic landscape
[12:42]
while still integrating some of the ecological and forestry best practices that the city would
[12:49]
like to achieve. And
[12:56]
with that I will turn it back to Karen.
[13:01]
Great thanks Nichelle. So this
[13:04]
Next slide references the active play zone in the back, like southern portion of the park.
[13:12]
In speaking to Michelle's previous slide about designing with a thoughtful approach and in
[13:19]
context of the space, we had some conversations about prioritizing work and with the picnic
[13:28]
shelter that has recently come down and some of the other capital life cycle replacements
[13:35]
at the back end in this zone that we're referring to. We were looking to find efficiencies in
[13:43]
making improvements and for lack of a better phrase, getting the most bang for our buck
[13:48]
in terms of that space. We know the following to be true currently in that existing location
[13:56]
in Victoria Park.
[13:58]
So the picnic shelter was removed last fall
[14:00]
due to its age and safety concerns.
[14:04]
The splash pad needs a complete overhaul.
[14:06]
It's at the end of its life cycle as well.
[14:09]
The playground's rubber eye surfacing needs repairs
[14:12]
and a few minor play elements need to change.
[14:15]
The trail surface needs repairs
[14:18]
and there's some user conflicts there as well.
[14:21]
Seating improvements and basketball court improvements
[14:24]
for all sort of highlighted is initial targeted capital work that can be, we can look at funding
[14:32]
within a short term period. Next slide.
[14:39]
So it's hard to see from this slide up that high but
[14:43]
we've tried to outline the like general area in context of the entire park itself
[14:50]
Really, just including the playground, the splash pad area, the picnic shelter, the existing
[14:56]
basketball court, the...
[15:00]
The machine shop. It's all sort of working together in conjunction with some of those life
[15:07]
cycle efficiencies that we are looking at moving forward. Next slide.
[15:16]
So with that, we're really
[15:19]
focusing on, for the master plan, bringing forward a bit of a conceptual overview of that
[15:26]
space. We don't have specific finalized design to be presented in the master plan itself,
[15:33]
but it's more of a conceptual understanding that we'd like to move forward with. Each
[15:38]
one of those individual capital projects we'll talk to our colleagues in heritage planning
[15:45]
and understand if the process would be to bring that forward to heritage each like
[15:50]
in an individual sense or as a collective, we want to make sure that the point that Michelle
[15:57]
made about cumulative impacts that were being cognizant of that and that as a whole we are
[16:04]
making good choices in terms of the design and the final impact of the park itself.
[16:10]
So the picnic shelter, we're looking at upgrading that to match the aesthetic of
[16:16]
existing park buildings similar to the recently renovated bandstand and shifting that structure
[16:24]
away from the machine shop as it's not in an ideal location currently. It's kind of pushed to the
[16:31]
farthest back corner of the park. The summer kitchen considering potentially a new use there
[16:38]
or location to support the Indigenous people's gathering space and the active play zone that
[16:44]
I referenced, for the play area specifically, we'd like to move the swings a little bit
[16:50]
closer to the existing play area because currently they are not meeting accessibility requirements
[16:56]
and open up that VISTA as the Heritage District Plan references, VISTAs and sweeps of grass.
[17:04]
We want to alleviate some issues with accessibility and consolidating those play
[17:12]
areas, improving maintenance for our staff, but also kind of improving that VISTA at the
[17:19]
same time.
[17:21]
And as well as the seating options around the playground and the splash pad that would
[17:26]
kind of concurrently work in tandem with those upgrades.
[17:30]
The splash pad replacing what's existing, but adjacent to the playground.
[17:37]
The basketball.
[17:38]
We'll look at that as more of a dedicated team area close to the outdoor exercise equipment
[17:46]
that's existing.
[17:47]
And then the trail piece, keeping in mind the point made about meandering pathways and not
[17:54]
expanding widths where absolutely not necessary, but looking at mitigating pedestrian conflicts
[18:02]
and improving the surfaces where we can.
[18:05]
Next slide.
[18:08]
So this is just an example, and I believe heritage committee might have seen this previously,
[18:15]
but we're looking at a Canadian supplier, ShaveView, that could potentially provide
[18:23]
a replacement for the existing picnic shelter.
[18:27]
We've discussed materiality and wish list options with our facilities management staff.
[18:32]
So they've given us an understanding of what they'd like to see in terms of power, lighting, durability, specs as they relate to a new structure in the park.
[18:44]
But we'll also obviously be considering the aesthetic to be consistent with, like Michelle had mentioned, the existing buildings and structures in the park.
[18:54]
whether that be cedar shingles or stone cladding of the base, something that
[18:59]
really fits within the context of the park next slide. And this is just another
[19:05]
alternative with a metal structure roof but there's you know there's a lot of
[19:12]
different opportunities to work with this supplier to achieve an aesthetic
[19:18]
that's agreeable to Heritage and to all those stakeholders as well. Next slide.
[19:26]
I think that's an alternative over to Michelle.
[19:32]
And so I guess in conclusion
[19:34]
what came out of the Heritage review was that as the draft
[19:40]
recommendations are presented now they will not detract from the Heritage
[19:46]
character and in some instances will actually create these opportunities to enhance the heritage
[19:52]
character. Most of the changes that Karen had described are located in that south end
[20:00]
of Victoria Park and when we move forward with implementation of the recommendations,
[20:09]
we will need to consider, you know, what is the right process so that we have that bird's-eye view of the park as a whole
[20:19]
and can understand sort of the cumulative impact of changes that might be more minor over time, but collectively, you know, could have a larger impact.
[20:31]
And then depending as well on the scope of change,
[20:36]
whether those changes are things that would be considered under our delegated approval authority bylaw
[20:44]
and or whether the scope of change requires consideration through the Heritage Committee and potentially council.
[20:54]
So that is the conclusion of the presentation by staff.
[20:59]
We do have our consultant here, if there are questions with respect to the memo that you
[21:09]
may want to address to the delegation, Karen and I are obviously available if there's questions
[21:16]
of staff, but generally we just like to open it up to the committee for comments and questions.
[21:23]
Thank
[21:32]
you and it gives us a really good overview of both the practical and the heritage items.
[21:44]
So I will open it up to committee for questions or comments, observations, and sure, Councillor
[21:54]
Chatlin.
[21:56]
Yeah thank you and thank you for this report. I just have a few questions and
[22:02]
maybe it's too early to answer them but there's mention of signage. I hope we
[22:10]
can keep that to a minimum, can we?
[22:15]
Through the chair, I think what the
[22:18]
recommendation is is to have a consolidated and comprehensive approach
[22:23]
and I think that idea would be to sort of minimize the signage but also likely
[22:30]
have sort of a consistent approach where we do introduce signs so that we
[22:37]
reduce that visual clutter both in terms of number but also in terms of like
[22:41]
design or style if that makes sense. Okay yeah just I'd hate to see the
[22:48]
park full of signs. It's a large park but it's not that big I guess. You
[22:55]
mentioned that the basketball area would be closer to the outdoor exercise area
[23:00]
and I was just wondering if that would in any way impact the the parking in that
[23:04]
area right now.
[23:10]
Yeah I can take that. So we're looking at kind of adjacent to the
[23:15]
existing parking lot. It won't impact the parking specifically it's just a
[23:19]
kind of a shift closer to that space,
[23:23]
so it reads as more of a consistent youth-focused space.
[23:27]
But yeah, no specific concerns about parking impacts.
[23:32]
Okay, great.
[23:34]
There's no mention of barbecues or outdoor,
[23:39]
I don't know if they're not called barbecues,
[23:40]
but pits, fire pits.
[23:44]
Have we decided not to do that?
[23:47]
So that's kind of come in tandem
[23:49]
with the picnic shelter I believe. We have sort of dedicated coal locations. There's a lot of
[24:00]
independent sort of multi-generational gatherings that we've seen over the last few years in the
[24:08]
park and people bringing their own facilities with them to the space. We do have a
[24:18]
the Parks Master Plan does provide some information in terms of like moving
[24:23]
forward with the pilot for that piece as well. So I don't know if Markey likes to
[24:28]
speak to that in more detail. I think there's room for minor improvements such
[24:32]
as that. So we didn't hear an outcome specifically for barbecues. We know it's
[24:36]
used but a permanent facility like that we can certainly add it after the
[24:40]
fact. It doesn't necessarily have to be part of the larger strategic plan. So
[24:43]
So if it's a grassroots initiative or something maybe you hear from constituents, we're happy
[24:46]
to place it in a location like that.
[24:50]
Okay.
[24:51]
Because I do think, as Karen said, there are a lot of multi-generational families that
[24:55]
do use the park.
[24:56]
Yeah.
[24:57]
Well, you know, hold parties and that sort of thing.
[25:00]
So it would be nice if they had that infrastructure available to them.
[25:05]
I couldn't hold off if others have questions.
[25:08]
No?
[25:09]
Okay.
[25:10]
What about the multi-use trail?
[25:11]
What ideas do you have for that?
[25:16]
Because I know it can be there is conflict
[25:19]
with pedestrians and e-bikes in particular,
[25:24]
or e-scooters.
[25:26]
We are looking at, as part of that southern portion
[25:30]
in the active play zone,
[25:33]
to have a sort of bypass trail
[25:37]
around the backside of that space
[25:39]
if we can consolidate it closer together. Still meandering in a way, but I think that
[25:45]
that would really help the conflicts we're seeing with pedestrians and e-scooters and
[25:50]
the entrance from the parking lot near the pavilion. There's a lot going on in that
[25:54]
space. There's a lot of crossover to the washroom facility if that becomes a change
[26:01]
room in the future or if we look at retrofit for that building. There's even more sort
[26:07]
crossover of pedestrians in that space and we're seeing that through our like
[26:11]
sensor technology as well so I think that that provides even more data behind
[26:18]
making a change there in terms of the pathway and providing a better
[26:24]
connection from the iron horse trail around that space to neighboring side
[26:31]
streets and to the rest of the park. Right okay and what about the
[26:36]
indigenous people's gathering space? I know one concern when it was sort of an
[26:43]
impromptu arrangement was the close proximity to the kids play area. So
[26:50]
would it be moved back slightly to avoid that conflict? So our colleague Carol
[26:56]
Bacon is managing that piece and the location is indigenous lead in terms of
[27:04]
I'm citing that appropriately and it's quite a distance away from the playground in an open
[27:12]
green space that I think we're going to have a communication of that publicly in the next
[27:18]
couple of days.
[27:20]
So yeah, we'll have a better understanding publicly of where that will be and where
[27:26]
it'll be cited and what the materiality and the design will look like.
[27:29]
Right. My other question had to do with the Victoria Park Working Group. They haven't seen
[27:36]
this yet. Will they be seeing it before it comes to Council in June? I forget when the
[27:41]
next meeting is. The entirety of the master plan? Well, at least, like, we can, I was
[27:48]
aiming to for post heritage committee to forward ASI's report if I think that that we can
[27:56]
keep that internal to the working group, but I think if need be, we would share that
[28:02]
as well.
[28:03]
Okay.
[28:03]
Thank you.
[28:04]
I think it's, you've done a great job.
[28:06]
Thanks.
[28:10]
Thank you.
[28:11]
Councilor Chapman.
[28:13]
Are there any other questions, comments?
[28:20]
Yes.
[28:21]
I just had a question about the, it was noted that there was potential for land
[28:28]
acquisition and expansion of the park beyond the railway, keeping in mind that it
[28:33]
be differentiated from the rest of the park if that happens from like a heritage perspective.
[28:38]
I wondered if that is something that is being actively pursued or is it just a hypothetical
[28:42]
depending on how things work out for some of these these plants.
[28:47]
It is being pursued but it's part of the larger city initiative just because the
[28:51]
resources to acquire properties is finite so it's not just Victoria Park it's across the
[28:57]
city so it is being considered realistically and actively just as part of the larger picture.
[29:03]
Okay, thank you.
[29:07]
Thank you, Preston.
[29:09]
Any other questions?
[29:13]
I have one or two.
[29:15]
With respect to the picnic shelter, I'm sure that's a capital cost.
[29:22]
Is it planned for this year or is this when the plan is finished?
[29:32]
That's the first one of the gate once we're through council approval.
[29:35]
like assuming it is approved through council, that is our first project to replace that function
[29:40]
and service as quickly as we can.
[29:45]
So further, you showed a few designs, and I'm wondering if, like, how you will work
[29:56]
Thank you.
[30:00]
with our heritage committee.
[30:03]
And I've seen now the two designs and I think I have a preference
[30:08]
on one of them. However, I don't know what the other members of the committee feel about
[30:16]
the design. So how will that proceed?
[30:22]
So specific capital projects. We will come
[30:24]
back to heritage committee similar to bridge replacements and any other major capital works.
[30:28]
This would fall under that same process, so we're not here to talk about the specifics
[30:33]
of the design, although we alluded to it and showed a nice picture about it and what we're
[30:37]
thinking about it, but the specifics of the materiality, the design, the size, we will
[30:42]
come back to this committee with the specifics and receive feedback accordingly and balance
[30:46]
with our own facilities management and our own operations team too.
[30:50]
In years past, it seemed to me that we did have committee reps sitting down with staff
[31:01]
in building projects like this, and I wonder if this might be a project that would be worthy
[31:10]
of maybe a member of the committee, and it sounds like there's a working group or
[31:16]
of the Victoria Park community group, something like that to talk and have some discussion
[31:24]
on this picnic shelter since it's part and parcel of their neighborhood.
[31:32]
Certainly will include the Victoria Park working group. They are, like you said, part
[31:36]
and parcel of the park itself, the neighborhood. They are part of one of the groups that
[31:42]
we will speak to once the design is underway.
[31:45]
Thank you. Another item that was brought to my attention and I have wondered
[31:56]
about this as well. For instance you have a road that carries a fair amount of
[32:04]
traffic through the park and I wondered like has there been any thought of how
[32:13]
one would, instead of maybe having the stop at one point, like a different way of dealing
[32:21]
with the traffic and the crossing, and I don't know if that's a concern.
[32:32]
Sure.
[32:33]
So, we had a pretty substantial engagement phase last summer that included internal
[32:41]
and external engagement.
[32:42]
We had a transportation charrette, so staff internally from our transportation department
[32:51]
talked about a lot of these pieces in terms of crossover of active transportation,
[32:59]
parking, the connection along Jubilee.
[33:03]
There's even in some of the older documentation that Rich Mills had shared with us,
[33:10]
There was reference to closing Jubilee back in the 70s and the 80s, and it seems to come
[33:17]
up every decade.
[33:20]
So there was a lot of conversation about is the park for cars, is it for pedestrians,
[33:26]
and back and forth about how we're managing that overlap.
[33:31]
I think that we've landed on a point where we're focusing more through this master plan
[33:39]
on over the next 10-year period on pedestrian circulation through the park space.
[33:45]
We have a parking strategy that we're looking at and strategic items that we're bringing
[33:50]
forward over the next 10-year period that try to get at the crux of some of those conflicts.
[33:58]
But yeah, I think that that's become an ongoing dialogue in our engagement and you'll
[34:05]
see it represented in the master plan as well.
[34:09]
Thank you. One last item we've got Nandering Pathways and I do believe in
[34:17]
the script I read about perhaps sand and gravel finishes and I think that might
[34:30]
be a bit difficult and I wondered whether there might be some consent. I'm
[34:38]
I'm just trying to think of the Romantic era or the landscape era, the late Victorian period,
[34:43]
and how you blend that, and I will be honest, I abhor Ashfalt, and I don't think it has
[34:55]
a place in the park for it, but I wondered whether something like an aggregate or a brushed
[35:03]
aggregate brushstone might work on the paths where you are suggesting the
[35:10]
gravel and the sand and then again I don't know where those paths are but I
[35:15]
just put it out there for your consideration if you want to respond.
[35:24]
We probably hold off until maybe we do that work but I know any asphalt
[35:29]
installations there they use a different type it's a rougher category
[35:34]
of asphalt to maybe allude to that sand and gravel finish.
[35:40]
But beyond that, it's typically a cost decision really.
[35:45]
If we're speaking of concrete to brush concrete
[35:48]
or expose aggregate concrete or something to that effect,
[35:52]
to do it in mass quantity is costly.
[35:55]
So asphalt is the better, is the balance I say,
[35:59]
of both of those where we get the accessibility benefits
[36:02]
of a firm stable surface.
[36:05]
and not quite as expensive as concrete so we'll consider that I mean I think it's
[36:12]
part of the cost considerations but doing this under budget is also part of it
[36:17]
too and there are modifications we can do to ask well to help the the visual or
[36:22]
to help the what it what it appears like
[36:29]
thank you are there any other
[36:33]
comments.
[36:38]
So staff have you any concluding remarks or do you feel you've
[36:44]
exhausted what we need to know? Michelle and Kieran. Karen. Through the chair, Doe,
[36:52]
we just wanted to present the information to the committee today and
[36:55]
acknowledge that you know parks and heritage planning will continue to
[37:00]
work together as the broader master plan moves forward but also as some of
[37:05]
those implementation pieces are sort of targeted
[37:09]
to start work on and absolutely where
[37:13]
a heritage permit is required,
[37:15]
we will seek advice from the neighborhood representative
[37:20]
to see whether those permits need to come to committee
[37:24]
or whether they can be processed
[37:26]
at a staff level under delegated approval.
[37:30]
Very good, thank you.
[37:32]
Any further direction?
[37:35]
Great.
[37:36]
All right.
[37:37]
We'll now proceed to our Bill 23 Municipal, and thank you again for coming.
[37:46]
Bill 23 Municipal Heritage Register Review.
[37:50]
So it looks like we have two properties, 130 Weber Street West and 105117 Onward Avenue.
[37:59]
And I assume, Victoria, you're going to be working on this and presenting.
[38:04]
All right.
[38:08]
Thank you, Madam Chair.
[38:10]
So the first property that we're bringing forward to this evening as part of our municipal heritage register review is 130 Weber Street West.
[38:19]
The property contains a two-story early 20th century brick building constructed in the industrial vernacular style with subtle Art Deco influences.
[38:31]
influences. I just wanted to note to the committee that the statement of significance refers
[38:36]
to the building having subtle classical revival influences, but after some reassessment these
[38:46]
appear to be more aligned with the art deco architectural style. So the building is situated
[38:53]
situated on a 0.59 acre parcel of land located on the northeast corner of Bright
[39:01]
Up Street and Weber Street West within the warehouse district cultural heritage
[39:06]
landscape and the principal resource that contributes to the heritage value
[39:11]
of the property is the commercial building.
[39:17]
So the property has designed
[39:20]
physical value as it is a representative example of industrial
[39:24]
vernacular architecture with subtle art deco influence. The property has
[39:30]
historical and associative value. So Charles Dorr, founder of
[39:37]
Dare Foods, was the original owner of these lands and the property formerly
[39:41]
housed the Dare Foods factory before a fire destroyed the building in 1943.
[39:47]
free. Dare Foods has since relocated to its location on Kingsway Drive. So A.B. Kaya of
[39:56]
Kaya Fabrics purchased the property and relocated the company to 130 Weber Street West in 1947.
[40:06]
Kaya Fabrics is a well-known entity in the Canadian textile industry. The company collaborated
[40:12]
with a Danish-based designer and artist
[40:15]
to produce textile art prints
[40:17]
that helped shape Canadian art textile styles.
[40:20]
And the company also had exclusive rights
[40:23]
to a line of fire-retardant fabrics,
[40:26]
making kaia fabrics a leading supplier
[40:29]
to schools, hospitals, and other institutions
[40:32]
throughout the 1960s and 1970s.
[40:36]
The current building at 130 Weaver Street West
[40:39]
was designed by B.A. Jones.
[40:41]
Jones worked with W. H. Schmaltz and assisted with the design of the 1922-23 Kitchener City
[40:52]
Hall building. And Jones also designed the 1932 public utilities building and the 1936-37
[41:01]
Church of the Good Shepherd.
[41:06]
And this property also has contextual value as it contributes
[41:10]
to the continuity and character of the Brightup Street and Weber Street West
[41:14]
streetscapes as well as the warehouse district CHL. So that concludes my
[41:20]
presentation on this property. Madam Chair would you like me to just move to
[41:24]
the next one and we can consider them both together or do you want to pause
[41:29]
here and have a discussion? Perhaps we can pause and we can take them
[41:34]
together but I'll ask the question. Are there any questions for Victoria on
[41:39]
this property.
[41:44]
Well, I have one. It's a bit of nostalgia. Does anyone remember buying
[41:52]
kaya fabrics or having someone make clothing of kaya fabric? I do.
[42:04]
I was really sorry when
[42:07]
that fabric company left our city and it was kind of a pleasant surprise to read
[42:15]
this in the in the script and I hadn't realized where this was made. Good. All
[42:21]
right. Are there any other comments or questions? All right. We'll proceed then
[42:28]
to the onward property.
[42:36]
All right. Thank you Madam Chair. So the second
[42:38]
property that's being brought forward this evening is the property
[42:43]
municipally addressed as 105 to 117 Onward Avenue. This property contains a
[42:49]
three-story mid-20th century brick apartment building constructed in the
[42:53]
structuralist architectural style. The apartment building is situated on a
[42:58]
1.19 acre parcel of land located at the corner of Onward Avenue and Weber
[43:02]
Street East in the Onward Avenue neighborhood cultural heritage
[43:06]
landscape. The principal resource that contributes to the heritage value of the
[43:10]
property is the apartment building.
[43:16]
So the property has designed physical value
[43:18]
as the building is a representative example of the structuralist architectural
[43:22]
style. The property has historical associated value given its association
[43:27]
with the original owner and builder Michael Krauss and it also has the
[43:32]
potential to yield information about post-war development within the city
[43:36]
of Kitchener. So Michael Krause was founder of Krause
[43:41]
Carbon Mills and Struidex Fibers and was a prominent member of the new apostolic church.
[43:46]
His religious work and his work as a builder were intertwined. He served as the contractor
[43:51]
for the church building at 182 Victoria Street North and helped build the current new apostolic
[43:57]
church at 160 Margaret Avenue. Krause was the founder and president of Stam Investments,
[44:03]
a company owned by the new Apostolic Church of Canada, which was involved in apartment
[44:07]
construction and land development. The company's proceeds were partly dedicated to the church's
[44:12]
missionary work in Asia, Africa, South America, and the Caribbean. The building at 105 to 117
[44:19]
Onward Avenue illustrates the role of apartment buildings in addressing post-war housing needs
[44:24]
in Kitchener. This building is part of a series of several apartment buildings
[44:28]
constructed by different owners on the same or modified plans around 1948.
[44:37]
And
[44:37]
the property has contextual value as the building contributes to the continuity
[44:41]
and character of the Onward Avenue streetscape. The building is in its
[44:45]
original location and maintains its original use as an apartment building.
[44:49]
Prior to World War II, the area around this property represented the limits
[44:53]
of Kitchener's Urban Development and there is a link between this building
[45:05]
So that concludes my presentation on these properties and I'm just going to put the recommendation
[45:12]
up on the slide for the committee. Thank you.
[45:18]
Thank you, Victoria. Are there any questions about this? Yes, Councillor Michele.
[45:25]
Thank you. It's nice to see this apartment being put on the list. Was there not another
[45:29]
apartment beside that at the same heritage at one point? I'm sure there was
[45:36]
two. Through the chair I don't know if there was one like directly beside this
[45:41]
property but on 265 Weber Street East which is very close to this property
[45:46]
there is an H plan apartment building and then the the two properties that
[45:52]
I mentioned at Borden Avenue are also sort of H plan blocks as well. Yeah I
[45:59]
I thought there was one up closer towards going towards East Ave, but that's okay.
[46:03]
It's nice to see this.
[46:04]
Thank you.
[46:07]
Thank you, Councillor Michel.
[46:09]
Any other questions for Victoria?
[46:12]
Well seeing none, I'm going to read the motion that pursuant to Section 29 of the Interior
[46:21]
Heritage Act, the cultural heritage value or interest be recognized and designation be
[46:26]
pursued for the following properties. 130 Weber Street West 105 117 Onward Avenue. Are
[46:35]
there any questions? Who would move this? Magda, thank you. Any further questions? All
[46:44]
right. All those in favor? It's carried. And this will go to Council for approval
[46:54]
June 29, 2026. Now we have the information items our heritage permit
[47:02]
applications tracking sheet. Are there any questions about that one? Seeing none
[47:09]
who would like to adjourn the meeting.