[1:07]
Good morning. Testing, testing.
[1:19]
So, he said it's good. Um, so then we'll
check on
[1:24]
public comment. Good morning. I see
audit LA on the line. Do you have
[1:29]
general public comment and comment our
on our agenda items today?
[1:33]
» Good morning, Mr. Turski. Yes, I would
like um general public and uh all items,
[1:38]
please.
>> Wonderful. We will get to you when we
[1:40]
get started.
>> Thank you.
[4:31]
breaking.
[9:10]
So this is for
[9:34]
Hello. How are you?
[9:52]
Sit up here.
Sit up there.
[10:07]
» How nice. Everybody get 60 seconds to
speak.
[10:12]
Okay.
[10:19]
Okay.
[10:24]
Diane,
hi John. How are you?
[16:42]
Good morning. Thank you for everyone
joining us in person and on the Zoom
[16:46]
platform. I'm gonna do a call for hands
raised before we get started shortly.
[16:51]
Good morning, Laura. Do you have general
public comment or comment on any of our
[16:54]
items?
>> Yes, please. General public and uh all
[16:58]
items, please.
>> Thank you.
[17:02]
» And Georgina, good morning. I see you
have your hand raised. Do you have
[17:05]
general public comment or comment on any
of our items today?
[17:08]
» Public comment and all agenda items,
please.
[17:11]
» Great. Thank you.
[18:35]
All right, let me put us into record
mode. Okay, President Kang, we're now
[18:39]
recording. I can get started.
Good morning everybody and welcome to
[18:44]
the regularly scheduled meeting of the
board of public works for Wednesday,
[18:47]
February 4th, 2026. Miss Zatski, please
take role and establish quorum.
[18:53]
» Of course. Good morning everyone. Devon
Zatski with the board of public works
[18:57]
taking role in establishing quorum.
We're joined by President Kang, Vice
[19:00]
President Chavez, President Prom Grant,
Commissioner Mitchell, and Commissioner
[19:04]
Cardinas. We're also joined by our city
attorney representative, Miss Virginia
[19:08]
Choy. Um, we do have public comment
today and multiple item commentary all
[19:14]
on the Zoom platform only today and no
neighborhood council comments.
[19:18]
» Thank you very much. We will get started
with general public comment which is an
[19:21]
opportunity for the public to address
the board on public interest items and
[19:25]
will be provided up to one minute per
person up to a cumulative total of 10
[19:28]
minutes for the general public comment
segment of each regular meeting.
[19:32]
Testimony shall be limited in content to
subject matters which are within the
[19:35]
jurisdiction of the board of public
works. The board may not take any action
[19:38]
on any matters discussed during the
public comment period. We do not have
[19:42]
any inperson speakers, so we will
transition to our virtual platform.
[19:47]
» Okay. Our first caller, Audit LA. Good
morning. You'll have one minute for
[19:50]
general public comment.
>> Good morning, everyone. Um, I want to
[19:54]
start off, I did ask before. I wanted to
um ask for a an investigation into what
[19:59]
happened with the shrine, what went
wrong, and why the Bureau of Street
[20:02]
Services did uh collude with CD9 and
LAPD to create an area where the
[20:09]
sidewalks were um they were partially
closed to only open to the public that
[20:16]
lived there, not to the general public,
which is illegal. It's it goes against
[20:21]
your page two. The city attorney's
office has already ruled on that that
[20:25]
no, you cannot close it is a, you know,
unconstitutional to close the entire
[20:30]
sidewalk to a passing public. But they
did it and they had Scientologists um,
[20:35]
you know, checking everyone's ID to see
whether or not they belonged in that
[20:39]
block and to go down that street. And I
don't know in what, you know, world that
[20:43]
Scientology gets to decide whether or
not I get to go down a street or not. So
[20:48]
I am asking you to please this is
something that really needs to be
[20:51]
addressed. It needs to be looked like
what went wrong fix it if it's
[20:55]
internally. Thank you.
>> Our next caller is Laura FM. Laura,
[21:00]
you'll have one minute for general
public comment.
[21:05]
» Hi, good morning board. Again, I would
like to bring up the revocable permit
[21:11]
that Elron Hubard Way. have a street
that is named literally from a cult
[21:17]
human trafficking abusive organization
that has been getting away with this as
[21:21]
you know as we've been talking about
this for the last 3 years. And so we
[21:26]
would like that to be able to be put on
the board uh on as a as an option for
[21:32]
people to vote or to be looked into
specifically because a they're not
[21:36]
paying their insurance that they should
be paying and there's many other fees
[21:40]
and the what they the reason they're
using the Elron Hover naming and all of
[21:44]
that is because of their manipulative
tactics of pretending they own the the
[21:49]
whole neighborhood in the city. So,
please can we get that revocable permit
[21:54]
to get rid of Elron Hubard Way and put
it back to North Barendo Street? Please,
[21:58]
please, please get that on the uh or
give us the option for that to be. And
[22:05]
then also, if you can stop giving
Scientology permits, that would be
[22:12]
» okay. Our next caller is Georgina. And
Georgina, good morning. You'll have one
[22:15]
minute for general.
>> Good morning. Thank you. Yeah. The fact
[22:19]
that they were IDing people are you're
not allowed to have a guest that day.
[22:24]
You could only use a public street owned
by the public if you lived on that
[22:30]
street. What if you had a guest? What if
you had a delivery? What if you wanted
[22:34]
to order in pizza? You're not allowed to
have uh services on a day where
[22:40]
Scientology happens to be doing
something on that block that day. That's
[22:44]
ridiculous. It's amazing that you have
allowed this to happen and their
[22:49]
revocable permit absolutely needs to be
revoked. They should be denied all
[22:53]
permits as a consequence of their
excessive abuses of every single permit
[22:58]
they've been given. Thank you.
>> Thank you, caller. All right, President
[23:03]
Kang, that is the end of our hands
raised for general public comment.
[23:07]
» Thank you very much. With that, we will
close general public comment and move
[23:11]
forward with multiple agenda item public
comment. The board will provide an
[23:15]
opportunity for members of the public
wishing to speak on more than one agenda
[23:19]
item during multiple agenda item comment
period for up to a minute per item up to
[23:24]
a total of three minutes. Today we only
have the minutes and one agenda items.
[23:29]
So you have up to two minutes um for
this meeting. This is the only time to
[23:35]
speak on more than one agenda item and
please identify the items that you will
[23:38]
speak on when you are called. We do not
have any inerson speakers, so we will
[23:42]
transition to our virtual platform.
>> Okay, audit LA, um I see you have your
[23:48]
hand raised. You'll have two minutes.
Please let us know which items.
[23:52]
» Good morning. Um let's start with the
agenda item. Um I guess number one
[23:56]
first. Uh we're talking sidewalk and
street amenities. Um amenities sounds
[24:02]
great. That sounds fancy and upscale.
What we really need is just sidewalks
[24:07]
and streets that are paved, that are
passable. I am already on my going on my
[24:12]
fourth set of wheels for a chair. I've
only had not less than a year. It's just
[24:17]
insane. Um people go with me, they get
shocked how I just like I can't navigate
[24:22]
so many much of it. So, I don't need
amenities cuz actually the amenities
[24:26]
actually block things. it blocks my um
my my travel uh because a lot of times
[24:32]
there's not enough room and the sidewalk
is bad. But but the other sidewalk I
[24:36]
want to talk about is on Elron Harbor
Way and amenities there is that if you
[24:41]
go down there, especially if you're a
former Scientologist that wants to just
[24:45]
go back to maybe heal and relive the
crimes against you, that you're going to
[24:50]
be chased away. You're going to be
intimidated by guards, Scientology
[24:55]
guards who do not have a contract with
the city to guard Elron Hoverard Way
[25:00]
Street or sidewalks. Their job is inside
their property. That's the only place
[25:04]
that they have any authority, but they
want to bring authority out to the
[25:08]
street and it needs to stop. It needs to
be investigated. I don't know if it
[25:12]
needs to be just through public works or
LA DOT or if you need to do a joint task
[25:17]
force to make it stop, but there cannot
be a street in America anywhere where
[25:22]
the citizens feel intimidated to go
down, especially people who are victims
[25:27]
or who, you know, or anyone. No one
should be intimidated. The nurses at
[25:31]
Kaiser who want to pass through, people
who want to go through protest, whoever.
[25:36]
Nobody should be intimidated. It needs
to stop. As far as the minutes, um I'm
[25:41]
really glad you're getting Graticus. I
hope you utilize it to its full um
[25:45]
potential with the minutes because I
think it's really important and it's not
[25:49]
anything about, oh, we want to re we
want to it's to see what we're saying.
[25:53]
No, we just want it documented.
>> We've been persistent with this.
[25:57]
» Thank you.
>> Our next caller is Laura FM. Laura,
[26:01]
you'll have two minutes for minutes in
item number one.
[26:04]
» Thank you. I'm going to also uh echo
Audit LA's comment there just now and um
[26:12]
again with the minutes. Same with the
just being able to have something that
[26:16]
shows uh you know that the public call
in and and but put in there exactly what
[26:23]
it is. There's a system now that you'll
be able to use and hopefully that will
[26:27]
do that. But it's it's one thing if you
feel like, oh, you're just, you know,
[26:32]
you can't really do anything or you got
something going on and some, you know,
[26:36]
sometimes the permits and all this
takes time and maybe you're sitting
[26:39]
there like thinking you can't do
anything. These are certain things you
[26:42]
can do. It helps people like me who were
raised in the cult of Scientology to
[26:46]
show that look, these are the things
that they're doing, infiltrating public
[26:50]
works and public the city sidewalks and
stuff like that by having fake programs,
[26:56]
fake permits, fake street names, all of
this. All of it does wind up on you guys
[27:01]
and on the board of public works. So, I
really do appreciate the whole thing
[27:05]
with the minutes and that you do have
granite kiss now to be able to reflect
[27:09]
that because we need that reflection as
the children born and raised in this
[27:13]
cult that has destroyed our
families. We need that reflection so
[27:17]
that later we can go and show the judges
and the court people what what legally
[27:23]
what's going on and why Scientology is
so manipulative and abusive in public
[27:27]
works in the city. So, thank you for
that and I yield my time. please revoke
[27:32]
their sign their permit on Elron
Hardway.
[27:34]
» Thank you caller.
Our next caller is Georgina. Georgina,
[27:39]
you'll have two minutes for minutes and
item number one.
[27:43]
» Yeah, I'd like to speak on minutes
first. I'm super excited about the
[27:47]
prospects that will come with Granus. I
expect great things from you guys. U as
[27:53]
far as your YouTube channel goes, the
fact that every video has the exact same
[27:58]
name. I mean, I'm just asking bare
minimum from you guys. Throw in a date.
[28:04]
Make those records researchable. How are
you supposed to look up anything when
[28:08]
you have thousands of videos each with
the exact same title? That's really uh
[28:14]
shoddy worksmanship. I expect better.
I'm just asking for bare minimum. Uh, as
[28:19]
far as agenda item number one, um,
sidewalk repairs and sidewalk amenities,
[28:26]
you know what amenity I would like to
see? I would like the public sidewalk to
[28:32]
be publicly accessible to people. The
fact that they deny access to the public
[28:38]
on a public sidewalk. What gives them
the right? They don't own the sidewalk.
[28:43]
It's ridiculous. You need to do better.
Thank you. I yield back my time. Thank
[28:48]
you, caller. Um, all right, President
Kang, that's the end of our hands raised
[28:51]
on the Zoom platform. We have one.
>> Thank you very much. I know we uh closed
[28:58]
general public comment, but multiple is
open. And so, I want to call up Jill
[29:01]
Jill Scientology. You have up to two
minutes since we only have two.
[29:06]
» Thank you. Um, the reason why I'm late
is because our public work is doing a
[29:10]
great job. So I'm very happy I lose my
minutes because I'm seeing our public
[29:15]
work is doing the real work. So that's
why the bus is delayed. So stop uh
[29:19]
talking about the minutes is that um I'm
here to support our um public work
[29:24]
directors because in the past year
actually past several years I've heard
[29:29]
multiple comments attacking on the all
department officials uh uh protest on
[29:35]
all department appointment or or whether
is LAPD chief, the public work director,
[29:42]
you know the mayor, the city council, uh
those are criminal protesters, they are
[29:46]
just never happy with anyone. with
anything. So I am here I'm the only one
[29:51]
in Los Angeles who want to voice our
support that our public work department
[29:57]
needs improvement. There are room for
improvement but at least I want to voice
[30:01]
my support to all agency directors in
public works even though I am the only
[30:06]
one who support them. Uh number two,
let's talking about the sidewalk issues.
[30:11]
Yes, sidewalk issues. Um again I am here
to support our Bureau of Street
[30:17]
Services, Bureau of Sanitation. They
need improvement but they are doing a
[30:22]
decent job. I want to give them a huge
round of applause. And then one of my
[30:26]
friend DOA, one of my brother DOA
actually uh lost um lost his truck his
[30:32]
van uh due to his uh um ex-wife is a is
a theft or whatever and then uh they
[30:39]
steal his van and then the van was
actually broken because of the broken
[30:43]
sidewalk because of the broken street
surfaces, right? So definitely I really
[30:49]
wish uh my friend DOA can get his truck
back and I definitely wish that in the
[30:53]
future when we have a old old cheap car
we don't have to uh damage our car just
[30:59]
driving on the surface of the street
support public work. Thank you sir.
[31:04]
» Thank you very much. Do we have any
other speakers on the queue?
[31:08]
» No.
>> All right. Thank you very much. With
[31:11]
that, we will close multiple item public
comment portion of today's meeting and
[31:15]
move forward with the approval of
minutes for Monday, January 26, 2026.
[31:21]
Uh, commissioners, any questions or
comments? Seeing no other discussion, is
[31:25]
there a first and a second?
>> So move.
[31:27]
» Second.
>> First by President Proim Grant, seconded
[31:30]
by Commissioner Cardness.
>> We will take the roll call starting with
[31:34]
you. President K.
>> I.
[31:36]
» Vice President Chavez.
>> I.
[31:38]
» President Prom Grant.
>> Hi. Um, Commissioner Mitchell.
[31:42]
» And Commissioner Cardes.
>> Hi.
[31:43]
» Great. All eyes. The minutes are
approved.
[31:46]
» Thank you very much. Moving on to agenda
item number one, sidewalk and transit
[31:51]
amenities program from the Bureau of
Street Services.
[31:58]
» Good morning. Uh, good morning President
Kang, uh, commissioners and city uh,
[32:04]
representative. Um, I'm here today to My
name is Kenneth Tang. I am the uh
[32:10]
contract administrator for our sidewalk
transit amendy program. Um today we're
[32:15]
here to provide an oral um presentation
and then give you some update on the
[32:21]
previous uh two quarter starting July
1st to the end of the calendar year and
[32:27]
um we wanted to provide context for
three major item right first one is
[32:33]
relating to the overall structure the
contract how we doing is this new
[32:38]
contract work and yes that's the uh uh
bottom line of that The second piece is
[32:45]
the implementation and roll out pace.
How are we doing? Are we improving? And
[32:50]
the answer is also a yes in that one.
And the third and final piece and a lot
[32:54]
of uh focus from you all for
maintenance. And we also here to provide
[32:59]
you some updated result from our audit
and brings you with the number and the
[33:05]
recommendation on how to proceed. Uh
with that, starting off with the
[33:10]
contract. Uh for those of you who are
not aware um staff uh contract is very
[33:16]
um uh innovative and h very uh new we
are uh receiving over 65 and a half% of
[33:24]
revenue on each of the advertisement
revenue. The rest go to the uh contract
[33:29]
to maintain and sell advertisement. And
this is a new model. Um and the only
[33:34]
caveat for this particular contract is
we have to invest in initial capital. Um
[33:41]
with that said the number that have been
showing is very promising over the past
[33:47]
two quarter that reported we have over 7
uh 38 million reported in uh as a
[33:53]
revenue from the advertisement. portion
that come to the city and that is the
[33:58]
highest we ever received uh for any two
consecutive quarter in the entire
[34:03]
history of the program.
Um the other number that I want to show
[34:08]
is that since the beginning of the
contract in 2022 2023 we have received
[34:14]
over 36 uh million dollar.
This number is significant because that
[34:21]
is represent over 40%
of what the previous contract were able
[34:27]
to made over 20 years. So three year we
already more than almost halfway through
[34:34]
the uh what the previous contract was
able to make. So uh the bottom line here
[34:40]
is that this structure work and uh you
see in the revenue um that is continue
[34:46]
to grow and we anticipate to continue to
grow in the coming year as the we build
[34:50]
out more structure.
Uh we anticipate we can bring up to uh
[34:55]
$60 million for the city um in the when
fully built out in 2032.
[35:01]
The next item I want to uh talk about a
little bit is the pace of
[35:05]
implementations. Uh the goal for the
program is to bring uh uh put in 3,000
[35:10]
transit shelter uh 450 shaped structure
and a few a bunch of other amenity as
[35:16]
part of the staff program. Um so that's
why it's important for us to create a
[35:21]
process and a pace that we can sustain
with the funding right and uh I'm happy
[35:27]
to report that we for the most part have
uh resolved the logistic of each
[35:32]
department and process to get the
location built and install the shelter.
[35:37]
There are some uh uh administrative and
there's some other smaller uh resource
[35:43]
issue with vious department that
continue to be the pipeline and
[35:48]
constraint for the program to fully uh
um roll out but at least we have the
[35:55]
process established uh we're not
figuring out for the first time it's
[35:58]
become a more steady rate now we're
working on controlling that pace
[36:03]
um I also happy to report that during
the that quarter we also resolve a
[36:08]
pending SQA challenge to the program. So
those are fully uh resolved and that's
[36:15]
allow our program to uh uh uh get more
freedom to actually do a lot of what we
[36:21]
need to do for the program. Um we also
increased capacity. We had uh funded uh
[36:30]
12 position at BSL which allow us to
increase uh the ability for us to access
[36:36]
BSL lighting and repair to our shelter.
Um and we are hitting uh uh over 200
[36:44]
service requests that um BSL support us
on meaning we also help
[36:51]
fix light as part of our program. So
it's not just shelter program. We also
[36:56]
bring some of the light uh
infrastructure uh back online.
[37:01]
I'm also uh happy to report that we
continue to build partnership with Metro
[37:05]
who is one of the largest transit
operator in the in the region. Um and
[37:11]
that partnership include
um integrating our shelter design into
[37:17]
their uh bus rapid transit corridor
along Vermont and a nohole to Pasadena
[37:25]
corridor. What that mean is they will be
uh using our transit shelter on those
[37:30]
stations allowing us to put
advertisement on those platform. So it's
[37:35]
revenue that's uh investment into the
initial capital for the program that we
[37:39]
continue to sustain and use
advertisement to continue maintain them.
[37:43]
We are working on finalizing the detail.
Those will come to you once we have all
[37:48]
the maintenance and the uh final uh um
agreement uh in place with metro. But
[37:54]
it's a exciting collaboration with Metro
and we want to have a uniform uh look
[38:00]
and feel across the region that this is
about stop.
[38:06]
Um
the uh final thing that I want to uh
[38:11]
bring up is that the program is rolling
forward and we anticipate we will meet
[38:17]
our goal this year. Um there are some
constraint around material procurement.
[38:22]
It's a nationwide issue but we
anticipate we will be able to resolve
[38:26]
those uh quickly and um uh bring to the
uh goal for the year. Finally, the meat
[38:34]
of the report, the maintenance and this
is something that uh we are um very
[38:41]
thorough in our uh investigation so that
we present to you with fact and with a
[38:47]
matrix that can represent the actual
issue at hand.
[38:51]
So
from our uh uh analysis so far we uh see
[38:58]
there is a traumatic increase in the
number of requests and uh uh maintenance
[39:05]
issue at bus stop. Um unfortunately this
is not just at bus stop. Bus stop
[39:10]
doesn't live in that uh isolated bubble.
This is a a city-wide kind of uh issue
[39:17]
that increase in vandalism and other uh
type of requests is generally a trending
[39:24]
across the city. But let me just report
on staff program for the last two
[39:29]
quarter.
[39:32]
Um over the last two quarter we have
over 3,000 vandalism requests open and
[39:39]
closed.
graffiti specifically
[39:43]
um and sticker on those shelter. We have
over 2,157
[39:49]
uh
report and and and address. Uh we also
[39:55]
have quite a few broken glass and uh
panel repair that happened at these bus
[40:01]
stop over 900 of those. So um overall
the last two quarter is following the
[40:08]
same trends we saw uh over the past five
years and I can go into more detail
[40:14]
about the uh overall trend as well as
part of the audit report but um the last
[40:22]
two quarter
total over 6,500
[40:28]
um service requests was received and
closed. that's averaging more than a
[40:33]
thousand per month.
So it is a a a big hall for um us to uh
[40:41]
uh address and this is a systematic
thing that we want to uh talk to you all
[40:46]
about some of the potential solution
that we propose moving forward. But
[40:50]
before we dive into the uh solution, I
do want to bring up a uh request by you
[40:57]
all about the audit itself. how what was
the result of it and what was the
[41:01]
recommendation that came out of it. So
the audit look at the data from 2019 uh
[41:07]
pre- pandemic all the way till 2025
and this examination is looking at the
[41:14]
trend of different kind of service
requests that we receive and um here are
[41:19]
some of the highlight
we had received an increase of over 200%
[41:25]
of graffiti incident over that past year
five years we received over uh another
[41:32]
67% % increase since 2019.
Uh overflow of trash and legal dumping
[41:38]
over 400% increase since 2015 uh 2019.
Total work order for the entire uh uh um
[41:47]
staff program had increased over 200%.
So the bottom line is uh it's a
[41:56]
issue that we see trending that cannot
be addressed
[42:01]
only with the current contract
obligations.
[42:06]
And on that note, the contractor are
performing above and beyond uh what is
[42:13]
listed on a contract on a regular basis.
They are visiting each site over uh um
[42:20]
two and a half time uh per furniture per
weeks. So two and a half time uh per
[42:27]
weeks per furniture.
Uh the contract only require about 1.6
[42:33]
per weeks.
So
[42:38]
they are uh meeting the application and
beyond. Uh the challenge right now is
[42:44]
more than just the uh contract themsel
not uh performing or not performing up
[42:50]
to par is the increased volume of
vandalism and all these requests.
[42:57]
Uh our recommendation and step forward
[43:02]
we uh are working on a uh privatization
exercise to
[43:08]
target location that consider hotspot.
So there will be more uh stopped by
[43:15]
these uh contractor at that hotspot
locations and then less on the other
[43:21]
that doesn't need that same cleaning or
have other kind of resource that already
[43:26]
associate with it. Maybe a bit is
already taking care of some of these
[43:30]
spot, right? So, we wanted to make sure
that we have a a method that fairly
[43:36]
judge where location is needed more or
less and monitor it, not just release it
[43:40]
after we change the um the schedule
maintenance. The second thing we also
[43:46]
plan to do is lessen the target of uh
thing at the amenity for people to tag
[43:52]
on. Remove the back panel where it's not
needed. This is like a white uh back
[43:57]
panel that people place um for various
reason but if it's not needed for that
[44:03]
location we'll remove it and that would
be less things for people to tag on. The
[44:08]
a few other thing that uh our program is
also uh working on is an audit of the
[44:14]
other side of the house
[44:20]
at bus stop right now. Um there's two
major player right. Uh one is the
[44:25]
shelter over 2,000 of them. The other
one we have over almost 56 5700 bus
[44:33]
bench that also require the same
maintenance. So we are auding the other
[44:38]
side of the house to see how we can
marriage this and align the way they do
[44:42]
things out there so that it's not just
optimizing a shelter and not taking care
[44:47]
of the bench contract. And that's
something that we are working on and we
[44:52]
will present with you a separate audit
for the bus bench and that would lead to
[44:56]
our recommendation also for a renewal or
the uh request of proposal for a new bus
[45:03]
bench contract.
And finally, uh we are anticipate to
[45:09]
submit to the board for a campaign for
keeping our bus stop clean to help uh uh
[45:15]
um you get information out there how to
get our shelter clean and help keep the
[45:18]
shelter clean because it's not just a
solution with uh with our contract
[45:23]
continue to increase the maintenance but
also community uh buying in and also own
[45:28]
that location that's amenity for them.
So we also like to have that campaign
[45:34]
and work with you all to sponsor these
and so that we can uh put that out there
[45:38]
on our shelter as part of the public
service announcement.
[45:43]
Um finally just conclude the maintenance
issue. Uh we understand that a a lot of
[45:48]
eyes on bus stop because it's the most
visible and a lot of people stop by it.
[45:53]
Um but it is a more broader issue and we
would recommend if uh uh with your
[46:01]
leadership to help bring stakeholder
together and we will be at the table to
[46:07]
talk about how all the amenity that
under staff program and the bus bench
[46:12]
program can support the entirety but uh
we are not the only player at the table.
[46:18]
There are a few other that also uh work
at bus stop and we would like to uh
[46:23]
under your leadership to bring that uh
cohesiveness across the department and
[46:29]
other entity to help address the bus
stop cleanliness issue. And with that I
[46:34]
conclude my oral presentation. Um let me
know if you have any question or other
[46:39]
uh clarification you would like to hear.
[46:45]
» Thank you very much. Um, I have several
questions, but commissioners, uh,
[46:50]
Commissioner Mitchell,
>> thank you for your report. Do I
[46:54]
understand you say that there's a court
challenge pending
[46:58]
» as to the program?
>> Can you repeat
[47:01]
» a court challenge pending
>> uh
[47:05]
» lawsuit?
>> As far as I know, we don't have any
[47:08]
pending.
>> Okay.
[47:09]
» All the uh um legal challenge to the
program have been resolved.
[47:15]
» Okay. And with regard to these
maintenance repair issues
[47:20]
pursuant to the contract is who's
responsible for maintenance of the
[47:24]
staff?
>> Uh a contractor named Shelter Clean.
[47:27]
They've been in uh and maintain our
shelter over 40 years. So you have some
[47:31]
recommendations with regard to because
of the overwhelming need and obviously
[47:37]
you mentioned the current contractual
obligation doesn't really address it
[47:42]
adequately because of the number of
requests for service right
[47:47]
» that's correct uh we do have the list
recommendation that we provide earlier
[47:52]
they are more smaller uh recommendation
uh but we like to try all these other
[47:58]
thing before revisiting
contract negotiations.
[48:03]
» Okay. If if possible, I'd like to be
further briefed on it. Maybe we can
[48:07]
discuss some some resolutions. It might
be like you said with regard to any
[48:12]
further contracts that we let we might
need to be a little bit more creative
[48:17]
about how we address ongoing maintenance
issues. It's kind of hard with graffiti
[48:23]
abatement all over graffiti all over the
city in terms of how to prevent it andor
[48:30]
act on it sooner given the uh as large
as the city is these issues aren't
[48:37]
confined to any particular area. They're
all over so to speak even to the extent
[48:42]
that you know even city signs get
graffiti or we with regard to the
[48:46]
protest we've had with regard to ice and
those issues we find that you know even
[48:52]
the the pavement gets graffiti so
I don't know how to address that maybe
[48:58]
we can talk about that further and
develop some ideas and maybe it's also
[49:04]
possibility of talking about how other
cities may address similar concerns.
[49:10]
Thank you.
>> Thank you,
[49:14]
» commissioners. Um I'm happy to ask a
couple questions. So I um I'm a little
[49:21]
puzzled by um the findings in your audit
because that is not what I've seen and
[49:28]
that is not what I hear. And um I think
all of us here recently got an email
[49:34]
from a constituent saying they reported
on January 21. It's been 10 days no
[49:41]
change. The first staff that was
installed Western and Olympic
[49:47]
that's been heavily graffiti damaged for
over a month. So,
[49:55]
you're saying they're going above and
beyond, and I know there are challenges
[50:00]
uh um for graffiti and others, but our
in my estimation, I think our graffiti
[50:05]
contractors are doing a better job of
removing graffiti when reported most are
[50:12]
completed within 48 to 72 hours. um and
staff there's no funding issue because
[50:20]
clearly the revenue is there and Transto
is uh an external third party vendor so
[50:26]
they're not restricted by many of the
city processes so I'm not sure where um
[50:33]
the disconnect is happening um and I'm
sure we'll have further thoughts but in
[50:39]
the current contract um what is their um
contractual agreement to visit Is it?
[50:46]
How often do they need to visit each
shelter?
[50:50]
» So, at minimum uh let me just give you a
quick rundown on this uh number. um
[50:57]
regular uh visit on-site visual uh they
have to do at least weekly uh 100% of
[51:05]
the time or 100 of the sh uh% of the
shelter hotspot
[51:10]
uh all the preventative and regular
maintenance they have to do three time
[51:14]
per weeks up to 30%
of the total inventory that we have deep
[51:20]
cleaning power washing um and structural
repair they have to you 100%
[51:28]
uh at least once per year
uh every six months.
[51:34]
» Every six month. Every six month at
least once.
[51:38]
So, if you're saying they're visiting
each shelter once a week,
[51:43]
clearly they're not visiting um once a
week and we're only at 3
[51:51]
and uh 32 shelter constructed with the
goal of 3,000. [snorts]
[51:59]
I don't think the graffiti issue is
going anywhere anytime soon. So, I I
[52:03]
think this board is very concerned. Um,
I'm sure you heard that the mayor just
[52:08]
announced a new clean corridor
initiative on major corridors and these
[52:14]
staff shelters are installed on ma many
of these you know major corridors and if
[52:20]
you know we're the city is maintaining
our responsibility of cleaning the
[52:25]
streets and the sidewalks and the weed
abatement but if the staff shelters
[52:30]
are looking like it is today that is
going to be very problematic. So
[52:37]
» yeah, um just one one more point of
clarification. Um the 300 is a new one
[52:42]
that we put in the we still have over
1,600 of legacy shelter that's still
[52:50]
being maintained uh to transition out.
So total we have over 1,800
[52:56]
shelter with trash receptacle and many
of those site to still to be maintained.
[53:01]
With that though uh we also have the
same kind of input from constituent and
[53:07]
various entity about this kind of
maintenance concern. One of the thing
[53:11]
that we um express and put in other
budget request in the coming year is to
[53:17]
get more eyes and ear to better quality
control the uh contractor. Currently our
[53:25]
staff is small and focusing on a lot of
implementation and uh overseeing the
[53:31]
service requests uh that coming in and
make sure the contract perform those the
[53:35]
quality and the level of service that we
need for them to perform would need
[53:42]
additional staff for us to keep an eye
out there. It doesn't have to be all us.
[53:45]
It could be other people who help
monitor this constituent um bit who see
[53:50]
things we like to see that those
reported to us so we can actually keep
[53:55]
these contractor uh and hold them to
their quality of that we expect. So we
[54:03]
understand on the uh audit itself it's
based on purely number that uh was
[54:08]
reported based on the system that was
generated by the system. How uh the
[54:13]
quality of their work at each of these
location we uh request that we have
[54:19]
additional staff to help us monitor
these kind of uh uh and manage that
[54:24]
activity uh better. So what what would
be are there any penalties or
[54:29]
repercussions about not them not meeting
the contractual obligations?
[54:35]
» Yes. So there is ability for us to site
them for the first incident that they uh
[54:41]
don't meet that obligation is a $200 and
then
[54:44]
» how many how much
>> uh $250. Let me just get that number for
[54:47]
you. Exactly.
>> Per per site
[54:50]
» per incident
>> per incident.
[54:51]
» So we report it and they didn't address
it. Right. that's escalate um and we can
[54:57]
do as many as so this become hey get it
done right
[55:01]
» what if it wasn't reported but they're
not doing their weekly checks
[55:06]
» uh the system that they are reporting in
shonet that they are um if the narrative
[55:12]
and the what we shown out there isn't uh
aligned
[55:16]
we will uh dive deeper into those uh
number as well um and also perform
[55:23]
additional internal audit about the uh
quality rather than the number of visit.
[55:30]
Um again the process right now because
of staffing uh issue for our bureau we
[55:37]
focus on the higher level management of
the program and in order for us to go
[55:41]
out there and do more of quality check
spot by spot on a regular basis we uh
[55:46]
asked to get more resource and we did
request it as part of the upcoming year
[55:49]
budget
>> and anything higher than the 250. Yes.
[55:53]
Uh this an escalating cost I can provide
it back to you here. Uh the second
[55:59]
incident this increase to additional
cost the third incident. So it's an
[56:04]
escalating and will continue until they
address the issue. Um so again I think
[56:09]
the the major thing that we can hold
them to the fire is report get more
[56:13]
people to report and keep an eye on it
and so that we can um
[56:18]
uh see whether they are meeting that
obligation or not and we can use that to
[56:22]
help them um change their uh practice.
What would be the the the the most
[56:29]
severe penalty that the city can
levy on Transito?
[56:35]
» Will be the contract itself,
right? Uh but that's a very um extreme
[56:42]
end. Um but uh there is a financial uh
penalty for each incident that can be
[56:49]
imposed until resolved and it could be
very significant for a uh contractor
[56:54]
that uh optim operating at their um
at the very optimal of their program.
[57:02]
Their people are uh working really
really really uh uh stretch forward to
[57:08]
make to meet the city need right now. So
it is will be a big penalty if we start
[57:13]
issuing those citations.
>> The last question and then I'll have um
[57:18]
the commissioners chime in as well is so
after they are reported um how how
[57:24]
quickly do they need to respond? What's
the expectation?
[57:28]
» So for emergency within 24 hour broken
glass or something like that that you
[57:33]
know caused some harm um a car hit it or
something we need to address it and
[57:37]
remove the the uh the the the the
challenge out of the way at least
[57:44]
mitigate it right. Um we might take some
more time to replace the glass and other
[57:48]
thing because it take time to order
those in but uh they have to get someone
[57:52]
out there within 24 hour. the uh regular
request uh the obligation for uh the
[57:58]
contract is within the week.
>> Within one week, you're saying
[58:03]
» one week.
>> One week.
[58:06]
» Okay. Um Commissioner uh President Tim
Grant.
[58:15]
» That's all. I may have not turned on my
mic. Um, I may have not heard this, but
[58:20]
with respect to the scheduled visits,
every site is supposed to be visited
[58:27]
weekly.
>> That's right.
[58:29]
» Do we have is there a report out of just
because they visit it, do they maintain
[58:36]
or clean it or they just I mean it could
just be a driveby with no action taken.
[58:40]
So apart from the request where someone
takes the initiative a resident takes
[58:45]
the initiative on their own I think what
one aspect we're looking at is what is
[58:49]
the obligation responsibility
that transito is taking when they visit
[58:55]
every week do we know how many repairs
how many um
[59:00]
cleaning up um repairing that they're
doing each week do we get a report
[59:07]
» we do um and that's also part of the
audit that was reported out. Um
[59:14]
the visit is a primary driver on getting
the eye out there and generate work for
[59:20]
location that need uh power washing.
They will be uh creating a a new uh work
[59:26]
order for them to go out and and
actually perform those power washing. So
[59:31]
um we have the work order creation
associated with each site after that
[59:35]
visit.
>> Okay. And
[59:37]
» we have those we have those numbers for
each week. How many power washes, how
[59:41]
many repairs are being done.
>> That's correct.
[59:44]
» And that's where the number that I
report at beginning of the uh
[59:47]
presentation came from. The number of
vandalism, the number of graffiti. So
[59:52]
those are recorded uh uh as part of that
visit.
[59:55]
» And similarly on the hotspots which are
visited three times a week,
[1:00:01]
my assumption would be that there are
repairs or washing
[1:00:07]
at least one of those three three visits
a week. Correct.
[1:00:11]
» Can you repeat?
>> Well, there's the hotspots are visited
[1:00:14]
three times a week as I understood.
>> That's correct.
[1:00:18]
» And we have report on those of of those
three visits a week for the hotspots.
[1:00:24]
What actions been taken on those? Is
that also listed in the audit?
[1:00:29]
So similar uh on the regular location
the hotspot get the same type of uh
[1:00:36]
treatment um just more frequence uh
trash or empty and any loose debris
[1:00:41]
graffiti uh stickers and stuff get
removed right so those uh hotspot is
[1:00:47]
increased frequencies
>> and the list of hotspots how is that
[1:00:52]
determined and how often is that
updated?
[1:00:55]
So the hotspot itself um the list is
determined by the number of work order
[1:01:00]
that's get generated
>> by the number of what
[1:01:03]
» the work order uh that generated per of
each of these location um the
[1:01:10]
rep prioritization or revising that list
it's uh based on adjustment of that work
[1:01:16]
order that get generated. Um we uh as
part of this exercise we want to
[1:01:23]
incorporate a more thorough way to
prioritize.
[1:01:27]
Uh when we consider hotspot it may not
be the same as how they see as hot spot
[1:01:32]
for them is just the number of frequency
>> right for us it's also including the
[1:01:36]
important of those locations and the uh
uh how uh the cleanliness uh that also
[1:01:43]
provide by external
entity at that locations. So again this
[1:01:49]
is something that we would like to
revisit oursel in the coming month to
[1:01:52]
rep prioritize those hot spot
[1:01:58]
» and we happy to share those result.
>> Thank you v uh vice president chavez.
[1:02:05]
» Thank you. Um I had some questions about
um just the rate. I know that there has
[1:02:14]
been challenges on the installations
with parts procurement, you know,
[1:02:19]
delays, um, initial uh, challenges with
um, coordination. Um, how are we today
[1:02:28]
in terms of the rate of installations,
the coordination with the, you know,
[1:02:36]
internal bureaus and public works, both
BSL and BCA as well as LWP. Are we in a
[1:02:42]
good place? And what's our rate of
installation currently?
[1:02:47]
» So, um, our current, uh, rate of
installation is roughly around, um, 20,
[1:02:55]
uh, or so per month. Um, so about one to
two per day. Um the like I brought up at
[1:03:04]
the beginning of the presentation
we know
[1:03:09]
what are the landscape of the
implementation are. Now the challenge
[1:03:14]
here is within that parameter or that
landscape. How can we make things
[1:03:18]
faster?
[1:03:22]
The main bottleneck for us right now is
the ability to energize and activate our
[1:03:29]
shelter with DGP. And this is a resource
constraint um that uh we
[1:03:36]
seeing on a regular basis. We install a
shelter out there that's have no power
[1:03:41]
until someone go out there and connect
us to power and in some cases we wait a
[1:03:45]
while. Um so that's where uh where we
are in term of that me primary uh
[1:03:52]
bottleneck for us is that uh resource uh
constraint to come out and do our
[1:03:58]
energization at bus stop.
And are you staff actively working at um
[1:04:05]
improving you know whether it's
expediting or um improving the
[1:04:11]
coordination or whatever information
that is needed is this more on the LWP
[1:04:16]
like permitting side or is this just
what like where is the source of getting
[1:04:23]
the approvals I know it's it depends but
>> correct
[1:04:27]
» most of them
>> uh to answer your question we are in in
[1:04:31]
fact we have a regular check-in with
each of these department every on a
[1:04:35]
weekly some case bi-weekly basis and DP
is one of them. Um the uh permitting and
[1:04:42]
the review side I think we're at a pace
that we're comfortable to uh move things
[1:04:47]
along. Um but the constraint is the
construction crew that need to go out
[1:04:54]
there and actually connect us to power
or um you know um create a new service
[1:05:00]
location for our program. So it's more
of the field side that is concerned and
[1:05:05]
this is something that we understand
that there are other demand on their on
[1:05:10]
them across the city. They are not only
supporting staff program. So they are uh
[1:05:15]
doing what they can uh in term of
process it's an ongoing thing and we uh
[1:05:20]
have there at the table with us to
figure out the challenge but again I
[1:05:24]
think this is bottom line is resource um
to how we can bring more shelter online
[1:05:31]
each day we don't energize we lose money
right and bus stop will be less safe
[1:05:40]
how can we bring our bus stop priority
above of uh some of the other um it's a
[1:05:46]
significant loss and we won't get it
back. Once you lose that advertisement
[1:05:51]
window, you're not going to regain that
money back for the city.
[1:05:55]
» So, what's the plan to address that?
>> So,
[1:05:59]
uh we've been uh in active communication
with EDP to see uh the commitment that
[1:06:05]
they uh are willing to um go out there
and address on a weekly basis. um 10 to
[1:06:12]
12 location per weeks. We are um not
seeing that number yet for various
[1:06:18]
reason. Maybe there are you know a rain
events or um other uh uh holiday issue.
[1:06:26]
We have not seen the 10 or 12 that we
were expecting and that's become a main
[1:06:31]
bottleneck for our program.
[1:06:35]
And so and so the bottleneck on the
utility coordination I understand that
[1:06:41]
um is not necessarily revenue funded but
the positions at street services and
[1:06:48]
street lighting are correct NBCA as well
right there's they're basically it's
[1:06:52]
this unique model where we're
specifically have identified positions
[1:06:57]
and funding to to um cover the cost of
that work because this is revenue
[1:07:03]
generating for the city. Um, have there
have there been or do you expect any
[1:07:10]
future impacts to those staffing levels
given the budget situation? Have you
[1:07:17]
heard of any potential issues
um coming down the frey so that we know
[1:07:23]
uh because again these are revenue
funded. They're not special funded per
[1:07:27]
se, but they're revenue fund. They're
revenue generating positions. So I want
[1:07:31]
to make sure that um wanted to hear from
you if there's any concerns on the
[1:07:36]
budgeting side.
>> The projected staff revenue is uh like I
[1:07:42]
reported it's continue to look positive
and stable moving forward. Uh at the
[1:07:48]
very least we can uh sustain the the
existing staff that is funded right for
[1:07:53]
BCA, BSL and uh BCA BSS. Um but again
the uh constraint of other department
[1:08:04]
that is not funded by our revenue is
where we run into issue. We don't fund
[1:08:09]
them and we don't control that pace. Um
but our revenue on our side it continue
[1:08:15]
to uh
be positive and look like the trend is
[1:08:20]
growing. So we don't see that as an
issue. Where that become an issue is as
[1:08:25]
the program uh grow we need to install
more site the capital for those are
[1:08:30]
taking from the same bucket of money and
so that's where uh as the trends grow we
[1:08:36]
like to also uh uh do more site um based
on those uh revenue increase um but we
[1:08:44]
don't anticipate seeing the the the uh
funding for that part uh decreasing. Uh
[1:08:50]
we also seeing a lot of interest in
grant developer and metro specifically
[1:08:56]
to invest into uh bus stop
infrastructure.
[1:09:00]
Um in fact uh in next few weeks I'll be
coming before the board asking for
[1:09:07]
authorization to execute part of year
two of our agreement with Metro which is
[1:09:13]
worth around $16 million that Metro will
be investing into staff program. So in
[1:09:18]
term of funding I don't anticipate that
we have uh that major uh challenge
[1:09:24]
moving forward but I think the pace and
the control of the installation will
[1:09:28]
become a major issue for at least the
the folk outside the the department the
[1:09:34]
the sphere influenced by the staff
program.
[1:09:37]
» Okay. And then shifting over to
maintenance, your your report talks
[1:09:42]
about um
the obviously the overwhelming
[1:09:47]
maintenance demands that were not
foreseen when we issued the contract. Um
[1:09:53]
but obviously it's a new day and we're
seeing increases
[1:09:59]
um of dramatic proportions that that we
haven't seen in a long time. I see that
[1:10:05]
um the contractor did submit a plan in
October
[1:10:12]
outlining data driven strategies um and
reallocating maintenance resources. Have
[1:10:17]
any of these been implemented?
>> So the uh reason why we Oh, so we have
[1:10:23]
implemented one of the um back panel
removal at Saba Pacific site. The reason
[1:10:29]
why we uh are taking a slower action is
because we need to justify each of these
[1:10:36]
actions because we are taking a certain
maintenance activity for location and
[1:10:40]
put it somewhere else. We need to be uh
uh make sure that we do a systematic and
[1:10:45]
show that this actually doesn't have a
negative impact on the location that
[1:10:49]
getting less right. That's why we create
wanted to make sure we create a
[1:10:53]
structure to actually review each of
these location each of these action so
[1:10:58]
that we don't uh um just broadly put out
a lot of these initiative without
[1:11:04]
monitoring and seeing result before we
put it out citywide. So the one that I'm
[1:11:10]
uh bringing uh a talk about today is the
back panel removal, right? We uh working
[1:11:16]
on a few uh removal to see how would
that work first. Did that uh removing
[1:11:21]
that panel actually uh lessen the
graffiti or people simply put the
[1:11:28]
graffiti on another part of the shelter?
So we want to study and make sure that
[1:11:32]
we're not just implement a solution
citywide without having a thought and a
[1:11:36]
a a process to review whether something
is uh working effectively or not. So uh
[1:11:43]
that's where it take us a time to uh
develop that process and see make sure
[1:11:46]
that these uh uh approach that we that
proposed are roll out in a methodical
[1:11:52]
methodical uh fashions. Um but again we
are uh at that phase that we are able to
[1:11:59]
see more of those roll out um of these
solution that proposed by the the the
[1:12:04]
contractor because we have the uh
process in place now. So you'll see um
[1:12:10]
few location here with shelter back
panel remove the location hotspot that
[1:12:15]
get shift around and monitor the
effectiveness of this. So um again we at
[1:12:19]
that stage where we can start seeing a
lot of those improvement.
[1:12:23]
Okay. Can you include in the next update
more detail about what's been
[1:12:28]
implemented and when and what the, you
know, what the data shows in terms of
[1:12:33]
has this been effective or not? Because
if this was submitted in October, now
[1:12:37]
we're in February and you're um waiting
to justify I'm still unclear by whom. Um
[1:12:45]
and then you're testing certain
thing ideas right now. Is that is that
[1:12:50]
correct? Are you in the process of
testing certain things? That's correct.
[1:12:54]
So let me give you just a quick example.
>> Back panel. It's simple, right? Just
[1:12:58]
remove it.
>> But uh we are looking at a parameter on
[1:13:02]
what criteria should we select to remove
those back panel because there are uh if
[1:13:07]
it's behind a gas station that could use
it for a barrier against um traffic. So
[1:13:12]
there all criteria need to be created to
see hey what is a a list of location
[1:13:18]
that we can test out without um have
major impact but also measuring what is
[1:13:23]
success look like
uh decrease by 5% is that effective or
[1:13:29]
increase by 50%. So that kind of a
success uh matrix we know that this is
[1:13:35]
uh something that we should be um
execute uh as fast as we can as well. Uh
[1:13:40]
but we want to do it methodically so
that we don't uh uh roll this out
[1:13:44]
citywide and seeing a bigger uh um uh
blowback on the the the new solutions. I
[1:13:53]
mean, I know we tend to address the
symptoms as as opposed to the root
[1:13:58]
causes of vandalism and dumping and
graffiti. Um,
[1:14:06]
but I'm just curious if if what if any
coordination currently exists with LAPD
[1:14:11]
or sanitation or homeless outreach teams
or office of community beautifification,
[1:14:17]
graffiti abatement teams. Are you
sharing is this information being
[1:14:20]
shared? Like for example, if there's a
serious um issue, you know, at a
[1:14:26]
shelter, I would hope that that's being
reported. Uh it's a public safety item,
[1:14:31]
but I just think information sharing,
especially hotspots, is that being
[1:14:35]
actively shared with with with
other departments.
[1:14:40]
» So for the uh uh trash receptacle,
that's the one of primary one that we
[1:14:45]
coordinate with.
>> I'm sorry, what?
[1:14:46]
» Trash receptacle.
>> Oh, trash recept. Yeah.
[1:14:48]
» Yeah. This is the one that we primary
coordinate a lot with sanitations and so
[1:14:52]
uh sanitation uh actually getting a lot
of their um
[1:14:57]
requests uh and routed to our program
when it is on our shelter or on our
[1:15:01]
bench. So that coordination happened
during the service request stage
[1:15:08]
and where I think we uh need to take a
step further is actually identify site
[1:15:12]
that need more
of those trash receptacle cleanliness of
[1:15:18]
this area need an increase whether that
from that from the staff uh program or
[1:15:22]
the bus program or sanitation right I
think that's there's a gap that we can
[1:15:26]
improve there um the uh other discussion
around LAPD uh this something that is an
[1:15:33]
ongoing uh issue. We have repeated
location that have
[1:15:38]
vandalism, breaking glasses, same
location and this is uh uh with the
[1:15:43]
support from LAPD. We report those uh to
make sure it get into a record so that
[1:15:49]
uh further investigation and track down
on uh perpetrator
[1:15:54]
uh in term of graffiti abatement with
OCB and other this is an area also that
[1:16:00]
we wanted to bring all the pieces
together. Um as I mentioned at the
[1:16:05]
beginning of the uh or report we um our
bureau uh and our program will continue
[1:16:10]
to optimize the way bus stop with our
amenity uh uh maintains. Uh but again
[1:16:17]
we're not the only one. uh if we uh you
know continue uh have
[1:16:23]
conversation and with your leadership to
bring a lot of these energy to the table
[1:16:28]
would really appreciate and bring our uh
solution more holistic rather than just
[1:16:33]
individual location or individual
program that have a certain
[1:16:39]
stake at bus stop. So yes um I agree
that's the next uh uh piece that we uh
[1:16:46]
would be interested in continue that
conversation with other identity other
[1:16:49]
agency to uh improve that uh quality of
service.
[1:16:55]
» Okay. So I mean I would recommend we put
together a working group with um all the
[1:17:01]
affected entities. I want LA sanitation
there. I want OCB there and their
[1:17:06]
contractors. Um we need someone from
LAPD. I think that um and you know also
[1:17:12]
the homeless outreach teams. I think
that this is I've seen a lot of camping
[1:17:16]
at staff locations. Um I think we need
to sort of address sort of deterrence
[1:17:25]
um deterrence. Uh I know a novel
concept. Um things like you know
[1:17:31]
enhanced cameras, lighting, extra
lighting. You know are there street
[1:17:36]
lights out? I bet you there are near
these locations. Um and so just have a
[1:17:41]
better coordinated um method of
addressing some of these issues because
[1:17:47]
as you said there might be graffiti and
vandalism happening at that loc shelter
[1:17:52]
but I guarantee you there's other
activity happening in that area and I
[1:17:57]
think if everyone is on notice everyone
who's doing work in that vicinity is on
[1:18:03]
notice that there's extra eyes and ears
on it there can be better communication
[1:18:08]
um to address and
deter some of this um activity and make
[1:18:12]
it safer for the people that are riding
transit.
[1:18:17]
» Appreciate that. And your leadership
will be uh uh very much uh uh needed for
[1:18:23]
uh bring the conversation together and
we'll uh bring all the contractor and
[1:18:28]
making sure that they are uh by the
contractual obligation and even beyond.
[1:18:33]
So um thank you for your leadership for
that.
[1:18:39]
Thank you very much, Commissioner
Cartness. Uh,
[1:18:41]
» yeah, thank you. Just going back
[clears throat] to the citations or the
[1:18:46]
infractions,
um, how many locations have had a first,
[1:18:51]
second, or even a third infraction
imposed because they didn't they didn't
[1:18:55]
complete the work or or didn't
satisfactory
[1:18:58]
um, hold hold up their end of the of the
contract.
[1:19:01]
» Uh, we have not issued any citations. Um
and uh so from uh
[1:19:09]
we again we have not issued any of those
uh infractional citation for not meeting
[1:19:14]
the quality of and the contractual
obligations because uh again the data
[1:19:19]
has shown that they have u meet those
obligations.
[1:19:24]
» So they met their obligations
self-reported met their obligations.
[1:19:29]
So, I mean, based on the information
that we're getting from from the
[1:19:34]
community, it looks like locations
haven't been meeting those obligations.
[1:19:37]
So, I find it um you know, both things
can't be true. So, something something's
[1:19:43]
going on here. And moving on to to the
construction, you were saying there's
[1:19:48]
approximately 20 plus locations per
month that are [snorts] slated or
[1:19:54]
scheduled for installation. Is that was
that the right number I was listening
[1:19:58]
to?
>> Uh yeah, monthto month is
[1:20:01]
» roughly 20 plus.
>> Um so but some of those aren't getting
[1:20:05]
the power installations that are needed
and like you're saying because there's
[1:20:09]
no power the city's not getting their
revenue but we're just continuing on to
[1:20:13]
the next month and starting another 20.
So what what's the you know if if if the
[1:20:17]
first month isn't getting completed and
you and you're working on the second
[1:20:20]
month what's [snorts] the backlog on the
power installations that are
[1:20:24]
accumulating uh you know you know say
when you get to month number three
[1:20:31]
» right uh but I just want to also uh they
are doing some not at the rate that
[1:20:37]
» no that's exactly they're doing some
which means they're not doing others and
[1:20:41]
the ones that are not being done are
still not done and we're going on the
[1:20:44]
next month and building another 20. Not
all of the 20 are power uh have power
[1:20:50]
requirements, but that number isn't
getting smaller. It's getting bigger in
[1:20:53]
terms of the backlog of the of the power
that's being installed. Is that what I'm
[1:20:58]
hearing?
>> That's correct. Uh right now we balloon
[1:21:00]
to roughly 20 30 locations of uh
location that need some sort of actions
[1:21:07]
uh either connect to power or pull new
service point. So, does it make sense to
[1:21:12]
continue doing power locations if the
power backlog I mean, would it make
[1:21:16]
sense to go ahead and just install the
ones that don't require power until the
[1:21:19]
backlog is completed? That way, you
don't you're not you're the number of
[1:21:23]
locations you have to go back to to
complete isn't getting bigger. Does is
[1:21:27]
that logical or does that make sense or
were you thinking about anything like
[1:21:30]
that? the uh even if we don't have power
uh for location that uh do sidewalk
[1:21:38]
construction and uh transit shelter is
still providing that benefit of um shade
[1:21:43]
and advertisement during the day.
>> Understood. But that but what you were
[1:21:47]
saying but what we were saying earlier
is the the city wasn't benefiting from
[1:21:51]
the advertisement right
>> for location that is digital for
[1:21:56]
location
>> for the digital
[1:21:57]
» digital because you splat screen in the
cases where we have uh um uh the static
[1:22:02]
the poster one those during the day can
be seen just not at night
[1:22:06]
» correct correct okay so just curious on
how that's how that's working um what's
[1:22:13]
the number of you said there was rough
roughly 1400 existing shelters.
[1:22:19]
» 1,600.
>> 1600. Thank you. So, what's the what's
[1:22:22]
the number or percentage of locations
that are considered on the hot hotspot
[1:22:27]
list? Do you know what that number is?
>> So, 30% of the 1,800
[1:22:33]
» approximately or 30% are are
>> uh currently slightly lower. Uh but
[1:22:39]
we're working to bring that back up to
30% uh of the contractual obligation.
[1:22:44]
the number could uh you know enter and
exit. So this flux throughout uh each on
[1:22:49]
a regular basis but we try to get that
sailing
[1:22:53]
» understood trying to do it but the say
we install another 300 locations
[1:22:59]
and all 300 of those are hotspot
locations. So the percent of the percent
[1:23:04]
of hotspots are going to go up. Right?
So it's not a it's not a it's not a it's
[1:23:09]
not a static number. it is what it is in
terms of hot hotspot locations of of
[1:23:14]
locations that have to be monitored on a
regular basis and and and and need more
[1:23:19]
more attention. So, is that um how do we
how are we going to figure that out? I
[1:23:25]
mean, when we're when when the locations
are being uh reviewed prior to
[1:23:30]
construction, are we looking at the
amount of graffiti in the area or the
[1:23:34]
amount of activity, homeless activity
that's going on in the area? what what
[1:23:38]
what goes into that that discussion pre
preconstruction to figure out okay we
[1:23:45]
know this is going to be a hot spot and
and the contractor is going to know day
[1:23:49]
one it's going to be a hot spot is that
is that the communication that that's
[1:23:53]
that's happening with with our vendor
>> the current process that hotspot
[1:23:58]
identification happened after
>> can't hear you
[1:24:00]
» the current process uh the hotspot
identification happened after
[1:24:06]
» understood but Can you agree that some
locations, you know, it's going to be a
[1:24:10]
hot spot?
>> We can. Again, it's up to us to
[1:24:12]
establish criteria and when we input
this uh location into the hotspot list.
[1:24:18]
» So, so day one, day one, they're going
to know, you know what, this this one's
[1:24:22]
going to be a problem. We got to stay on
top of it.
[1:24:24]
» That's correct. we can and uh I I think
that's a great suggestion for us to uh
[1:24:30]
take 311 and other graffiti uh vandalism
information to our design process and
[1:24:36]
the construction process so that we
could uh um on day one have that as part
[1:24:42]
of this.
>> So 30% every uh three of them that we
[1:24:47]
put in one of them could be hotspot.
>> Okay. Well, I I see you this this is a
[1:24:52]
great program. I don't want to be all
negative but we have to understand that
[1:24:55]
once we we increase our numbers and and
we get up to the additional 1400 plus or
[1:25:02]
1300 plus when we we complete the 3,000
uh locations.
[1:25:07]
» Um we need to really have a good
understanding of how we're going to
[1:25:10]
maintain these because buildings
buildings one thing maintenance never
[1:25:13]
ends. So, we need to make sure that
we're on top of that and and that we do
[1:25:16]
it successfully so that the the city can
benefit, you know,
[1:25:21]
as much as they can and still keep these
uh locations for the public accessible
[1:25:26]
and and safe. So, I look forward to
seeing what our plan is going forward.
[1:25:30]
Thanks.
>> Thank you.
[1:25:34]
» Thank you very much. Any last minute
comments or questions, commissioners?
[1:25:37]
» Yes. Is it possible to get a copy of the
report?
[1:25:41]
C
>> can you repeat? Do you have a report
[1:25:44]
sent to all the commissioners so we can
actually review it and if we have some
[1:25:48]
further questions or comments we can
direct them directly to you.
[1:25:52]
» A report for the uh
>> is there an audit report?
[1:25:56]
» Yes.
>> Okay.
[1:25:58]
» Yeah, we can definitely share this is a
copyright.
[1:26:00]
» Okay. We just want you to make it
available to the commissioners through
[1:26:03]
the executive officer.
>> Yes. Uh we can share this after the
[1:26:06]
meeting.
>> Thank you.
[1:26:09]
» All right. Any other last minute
questions or comments? So, we would uh
[1:26:14]
given the urgency of the item, I would
love to I would like to reschedu um uh
[1:26:20]
for you to come back sooner than later.
So, uh we'll coordinate with our
[1:26:26]
executive officer and our team to
schedule another briefing in the next
[1:26:30]
couple of weeks uh to follow up. Um with
that, thank you very much.
[1:26:35]
» Thank you.
I believe that concludes our items for
[1:26:40]
today. All right. Thank you very much.
Our next regular meeting of the board of
[1:26:44]
public works will be on Friday, February
6, 2026. The meeting is now adjourned at
[1:26:51]
11:08 a.m.