Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:00]
e
[0:48]
good afternoon this election Tuesday
[0:51]
this is the uh city of Marian city
[0:54]
council work session for November 5th
[0:58]
2024 this started I think Jake are you
[1:01]
up first with us the
[1:04]
presentation good afternoon mayor or
[1:07]
city council uh Jacob H Deputy city
[1:09]
engineer with me is Louis with rer
[1:11]
Associates we're here to give the final
[1:13]
Central Plaza construction update and
[1:16]
after we're done here with questions for
[1:19]
Louis then we'll invite Seth up to give
[1:21]
his proposed plan for things moving
[1:26]
forward hi everyone uh I'm Louis rugio
[1:29]
with uh Rend Associates uh project
[1:31]
manager on Central Plaza project um so
[1:35]
to kind of go through things we've uh
[1:37]
we've had complete here in the last few
[1:39]
weeks um we do have the addition uh
[1:42]
completely um locked up and uh masonry
[1:45]
is complete there um along with the fire
[1:48]
tables and the light
[1:51]
peers um we also have now completed the
[1:54]
play structure retaining wall and the
[1:55]
play structure uh inst installation crew
[1:58]
will be on site on Monday so working on
[2:00]
that they've got some uh footings and prep work that go along with
[2:04]
that uh in the depot itself uh we are
[2:07]
just about wrapped up with MEP Ruffin um
[2:09]
we've got our contractor lined up to
[2:11]
start framing up ceilings next week um
[2:14]
and then also we are close to being
[2:17]
wrapped up on building the ice Loop
[2:18]
floor uh with the with the first pour
[2:21]
date of that uh for that floor of
[2:24]
1119 uh we have taken delivery of all of
[2:27]
the ice Loop equipment uh Chiller
[2:28]
condenser everything is set in place uh
[2:31]
and ready to pipe up and um they're
[2:33]
going to start working on that next week
[2:34]
as well that'll be modern piping they've
[2:36]
hired local for that so that's good uh
[2:39]
and we took delivery of light poles two
[2:41]
weeks ago and those are all prepped uh
[2:44]
and thank you to uh the Medco group
[2:46]
because they let us use that um that
[2:48]
area six and Main South lot for uh
[2:51]
staging on that uh but those are all
[2:54]
ready to go and those are actually all
[2:55]
going to be set on Saturday so that'll
[2:56]
be all the light poles around the ice
[2:58]
Loop and then the the 3 40 Footers are
[3:01]
all that are left to
[3:03]
set um ongoing we've got about 35% of
[3:07]
site Paving uh complete we've got we
[3:09]
have one more poure this week um we will
[3:11]
also have our stream feature uh pour
[3:14]
hopefully on Friday um we've got
[3:16]
everything ready for that all it's all
[3:17]
roughed in uh because that that gets
[3:20]
pavers on top of
[3:22]
that uh and then the ice slop floor
[3:24]
installs ongoing and then uh as of last
[3:27]
Friday we've rerouted our struction
[3:29]
fence along 7th AV uh for the P tree
[3:31]
setup it's pretty swampy out there right
[3:34]
now but uh eventually that'll that
[3:37]
spot's carved out for the
[3:39]
tree um upcoming uh they have started
[3:42]
installing C the curtain wall system at
[3:45]
the Depot and so all that glass uh
[3:47]
should be in early next week and they'll
[3:49]
get that installed I think I believe
[3:50]
they've got five openings uh of the
[3:52]
curtain wall system in so
[3:54]
far um and then we will also be
[3:57]
sheathing the roof the the truss work is
[3:59]
complete now
[4:00]
uh and that um mechanical me install so
[4:04]
starting to pipe up everything to the
[4:05]
chiller um and out to the condenser
[4:09]
there uh final items we touched on the play structure already which um
[4:14]
that'll start next Monday and and likely
[4:17]
go a little longer than a week um that's
[4:20]
a contractor coming in from St Louis
[4:23]
area uh and then site papers we we have
[4:26]
the first uh first pour of paper base
[4:28]
down uh they're looking for I a little
[4:31]
bit more space so hopefully mid next
[4:32]
week we'll be able to get uh hm uh
[4:35]
asphalt and which which will be the
[4:37]
actual layer that the the papers sit on
[4:40]
there around both uh the east side where
[4:44]
um adjacent to the broaden main building
[4:46]
and then also um around the depot
[4:49]
itself and then uh we are currently with
[4:52]
our our uh our ice Loop pores occurring
[4:56]
U middle of middle of November through
[4:58]
the beginning of December we've got a um
[5:01]
a period of time that we cannot do
[5:02]
anything with that concrete uh for
[5:04]
caring purposes and so we're looking at
[5:06]
uh early January getting that first
[5:08]
sheet of ice on everything painted and
[5:10]
going through all that that training
[5:11]
process with the city for the ice Loop
[5:18]
itself great and with that uh as always
[5:21]
you can stay informed at our website
[5:23]
with the link on the feed here where you
[5:24]
can support the capital campaign VI to
[5:27]
live feed as well as my bi-weekly
[5:29]
Construction update email sign up with
[5:32]
that we'll be happy to answer any
[5:34]
questions so the question I keep getting
[5:41]
asked is will the ice loop at all be
[5:46]
open this winter Seth will touch on that
[5:49]
moment
[5:50]
per I hate to steal his thunder so that
[5:53]
I mean that's the key question I think
[5:55]
obviously once we start putting the
[5:56]
windows on the depot that is going to
[5:58]
change a lot lot of the the appearance
[6:00]
and what's going on I think people still
[6:02]
don't understand what's going to happen
[6:05]
with the depot that that's going to be
[6:06]
en closed because you're doing a lot of
[6:07]
work inside if they're not seeing so
[6:10]
once you guys put the windows slap the
[6:11]
windows in there people are going to say
[6:13]
wow that's gonna that's looking really
[6:14]
nice so looking forward to that the
[6:17]
other piece of of that after the windows
[6:19]
go in is we do have the The Columns for
[6:21]
the canopy being Mill uh so that they
[6:23]
have that same decorative pattern on the
[6:25]
corners that the the old ones did and so
[6:28]
once once the windows are in then we'll
[6:30]
get those those columns in and get that
[6:32]
canopy built back so one other question
[6:34]
so once we come to the spring time and
[6:37]
maybe this is Suess question too but
[6:40]
once we come to the springtime obviously
[6:42]
you've got a work Zone there with all
[6:44]
the grass and mud and everything so so
[6:48]
is that I'm assuming that's all the
[6:49]
spring work that Parks needs to be doing
[6:52]
and getting that all put back into shape
[6:55]
so that that will be part of our
[6:57]
contract that's part of your contract
[6:58]
yes uh seaing and then there's a um a
[7:01]
reinforced Turf that goes along 7th AV
[7:04]
uh and and then the plantings yeah so we
[7:06]
we'll uh we'll re-engage and hopefully
[7:09]
early early to mid-march on some of that
[7:12]
stuff um okay our our intent for right
[7:14]
now is to put up snow fence through the
[7:16]
winter um that basically blocks off so
[7:18]
that ping is the only accessible route
[7:25]
okay um Louie first off I want to um
[7:29]
just
[7:30]
I guess say congratulations because the
[7:32]
chiller equipment is on site it is and
[7:35]
ready to be plumbed in yep and that
[7:39]
initial work to make that system
[7:41]
operable I I think last time you were
[7:43]
here I expressed just a concern about
[7:46]
you know that's that's the critical hunk
[7:48]
of equipment that's really meaningful to
[7:50]
the whole uh upgrade of the plaza um so
[7:54]
I just again congratulations for that
[7:56]
and I'm just hoping that we don't have
[7:58]
too bad of weather in between now and
[8:00]
the end of the year so all that work can
[8:02]
progress um Seth in advance of uh
[8:07]
responding to Steve's question you know
[8:08]
he's very anxious to see the ice sheet
[8:11]
ready to go I just want to know will you
[8:13]
be renting double Runner skates uh for
[8:18]
Steve you know they're it's a safety
[8:19]
thing those two Runners on each skate
[8:21]
are an important thing for him I'll be
[8:23]
out a
[8:27]
sled than any
[8:31]
questions Seth for Seth okay toss it to
[8:34]
Seth
[8:36]
then so following the construction
[8:39]
project we're going to have a transition
[8:41]
period where it's going to be um one I
[8:44]
want to discuss a little bit about the
[8:45]
holiday lights on what we're doing this
[8:47]
year for the holiday lights so we are uh
[8:49]
going to be decorating we're currently
[8:50]
decorating the roundabouts and um uh the
[8:53]
Uptown streetcape uh the artway in the
[8:55]
North Plaza area um much like what we've
[8:58]
done uh in the years's past uh the thing
[9:01]
that will be different will be City
[9:02]
Square Park um in which we're not going
[9:05]
to have the the trees within the park uh
[9:07]
lit up this year uh since it's still
[9:10]
going to be a construction site but we
[9:12]
will be putting the um the holiday tree
[9:15]
in the park and there's going to be a
[9:16]
carved out area um it's actually going
[9:18]
to be right now we have a section um
[9:21]
over here for the tree uh so we talked
[9:24]
about both locations but it's going to
[9:26]
be near the electrical that we have
[9:29]
power uh for uh we were planning on
[9:32]
starting that installation on Monday but
[9:34]
the weather had other plans for us so we
[9:36]
will be uh be putting that tree up uh uh
[9:40]
here in the next couple weeks uh we will
[9:42]
be doing 30 feet of the tree not the
[9:44]
full 38 um and then next year when we
[9:47]
have the full operation of the plaza
[9:49]
we'll be installing the tree in its new
[9:51]
location uh in the middle of the ice
[9:53]
slop uh this is a map too of the uh
[9:56]
Christmas in the Park as you see we are
[9:59]
um not doing uh things in the park but
[10:02]
sticking to the uh North Plaza and the
[10:04]
streetcape um and then obviously we'll
[10:06]
have um the staging area for the horses
[10:10]
uh at the old library lot lot for that
[10:15]
event in addition for the ice skating
[10:17]
Loop uh there's not going to be any
[10:19]
activity in December uh for ice skating
[10:22]
but we'll begin uh building the ice and
[10:24]
working with uh with rener neck and um
[10:27]
the contractor they have to train uh Park staff and staff uh on
[10:33]
how to build the ice um how to maintain
[10:36]
it and then we'll facilitate a soft
[10:38]
opening uh in mid mid January um and
[10:42]
we'll have that uh for um for about
[10:45]
three weeks and we will when we do the
[10:48]
soft opening we'll do skate rentals in
[10:50]
which we'll have skating AIDS available
[10:52]
for people to utilize uh we're doing
[10:54]
that free to open uh and we'll have some
[10:57]
more operational schedule uh items that
[11:00]
uh that will continue to touch base with Council on what the soft opening
[11:04]
will look like and what operations will
[11:06]
look like for The Following season next
[11:08]
year uh at the next council meeting and
[11:11]
then for the ribbon cutting event uh we
[11:13]
do not have a scheduled date at this
[11:14]
time but we will have one uh before the
[11:17]
end of the week um and we're looking at
[11:19]
around Springtime following the
[11:22]
installation of the artwork and the uh
[11:24]
the grass um seaing and uh plantings so
[11:29]
any
[11:30]
questions you answered the other
[11:38]
question I had but you said the grass
[11:39]
seating so everything's going to be
[11:41]
seated there's no sod getting put down
[11:44]
there's no sod we will have an
[11:45]
irrigation system to help with okay if
[11:48]
there is a a lack of moisture
[11:52]
so any other questions I'm here okay
[11:56]
thanks SE thank you
[12:02]
next up I think we have Bill annual
[12:05]
presentation from the Marian Public
[12:06]
Library Board of
[12:11]
Trustees good evening mayor proam and
[12:13]
Council thank you for the opportunity to
[12:16]
allow us to give you some highlights um
[12:20]
and share with you our FY 24 annual
[12:23]
report um in front of you on the dis is
[12:26]
the libraries fy4 report is actually the
[12:30]
pen in Disguise it has a little Banner
[12:33]
inside with some highlights of our
[12:35]
fiscal year and also in front of you is
[12:38]
a copy of our just fresh off the press's
[12:41]
Strategic plan which we won't be
[12:44]
addressing this evening but we'll come
[12:45]
back with updates for in the future um
[12:48]
but with me this evening um I'd like to
[12:51]
recognize and introduce uh three of our
[12:54]
board members we have um Kim Susan and
[12:59]
Ross with us this evening um and Ross
[13:01]
McIntyre is our board chair and he will
[13:04]
be doing our update presentation for you
[13:06]
all um with an opportunity to ask
[13:08]
questions in a couple minutes
[13:14]
Ross thank
[13:19]
you I heard this was a working session
[13:22]
so I brought my ping pong paddles a
[13:23]
couple board games perfect I guess
[13:26]
everybody has a different idea of what
[13:28]
working session means but uh um thank
[13:32]
you first of all take this opportunity
[13:34]
to thank you there's a lot of hard work
[13:36]
and dedication in this room and I want
[13:38]
to take the opportunity to say thank you
[13:40]
for the hard work you've done to make
[13:42]
the city of Maran a great place to live
[13:44]
and a great place to raise a family and
[13:47]
uh so thank you and uh thank you grant
[13:50]
Harper for this uh photo that we have
[13:54]
here what a year this is um this is just
[13:58]
a small Glimpse at everything that
[14:00]
happened this last fiscal year and these
[14:03]
are pictures of the dynamic programming
[14:06]
that we have for all ages celebrating
[14:08]
our grand opening of partnering with
[14:11]
City departments investing in our future
[14:14]
and
[14:15]
more uh it has been a great year for the
[14:17]
library it feels to me like the library
[14:20]
has has really begun to just come into
[14:22]
its
[14:23]
own um it is embracing its place as a
[14:27]
center of the community Community uh
[14:30]
there is a a sense of of teamwork U A
[14:35]
Team uh sense there that Fosters The
[14:39]
Innovation and productivity to make uh
[14:42]
great things happen at the library and
[14:45]
uh there have been no large natural
[14:47]
disasters or pandemics that we've
[14:48]
noticed uh so everything is is is going
[14:52]
pretty good this year and um very great
[14:55]
things happen because of very careful
[14:58]
management and skilled leadership and
[14:59]
that makes me very excited to see what
[15:02]
can happen in this following
[15:06]
year uh so these are a few pictures of
[15:09]
some special moments that make a very
[15:11]
special uh year last
[15:13]
year okay this is the library doing what
[15:16]
a library does um nearly 4,000 new
[15:20]
library cards that's over 10% of the
[15:24]
population of
[15:25]
Maran uh and that's over 10 per day of
[15:29]
the year in average and we're not even
[15:32]
open every day of the year um nearly 180
[15:37]
Library visits from homeschoolers to
[15:40]
professionals retirees to public school
[15:44]
students parents with small children
[15:46]
College age students everybody kind of
[15:49]
uh finds a place there uh over 61,000
[15:53]
program
[15:56]
attendees this shows very good to
[15:58]
discernment about which programs are
[16:00]
doing real well which ones need a little
[16:03]
adjustment and these are programs for
[16:05]
all ages kids teens adults seniors
[16:10]
everything and uh just over 1,200
[16:14]
volunteer hours from dedicated helpful
[16:18]
people who believe in the library's
[16:19]
Mission and believe in helping the
[16:22]
library to reach
[16:24]
higher
[16:26]
um 30 uh 391,000 uh physical items
[16:34]
circulated uh 642 meeting room
[16:37]
reservations these are private room
[16:39]
bookings not library
[16:41]
programs uh and it has been great to see
[16:43]
how much these rooms are getting used by
[16:47]
groups of one type or
[16:49]
another um 114 free notary appointments
[16:54]
it would have been one more but
[16:55]
something come up for me but something
[16:57]
came up at the last minutes so I had to
[16:59]
go elsewhere but uh and 7,500 room
[17:03]
reservations and that again is a
[17:06]
significant number because that's over
[17:07]
20 per day of reservations of of the
[17:12]
library and I'm not there all the time
[17:13]
but when I do go into the library almost
[17:16]
without fail I see four or five of those
[17:18]
rooms occupied and being used by uh the residents of Maran so it's just a
[17:24]
wonderful thing some new things at the
[17:27]
library for this year
[17:29]
the E assist bicycles you can check out
[17:33]
one of two bicycles for use within uh
[17:37]
the city limits here of
[17:39]
Maran uh borrowers must be 18 years of
[17:42]
old or older and this expands the
[17:45]
library's library of things which also
[17:48]
includes you know baking pans um board
[17:51]
games puzzles ukuleles
[17:55]
binoculars um pickle ball equipment
[17:59]
um not ping pong paddles but I'm going
[18:01]
to change that here in a few
[18:03]
minutes um all right uh other new thing
[18:07]
at the library the Fiera code program so
[18:10]
this online coding platform that teaches
[18:13]
coding from the ground up there are well
[18:17]
attended coding you know clubs uh for teens and twins um and this expands
[18:24]
the library's stem program
[18:27]
offerings learning something new is
[18:29]
something that the library always
[18:32]
promotes whether it's finding a new book
[18:34]
to read that you fall in love with or
[18:38]
learning new skills for for uh the
[18:40]
modern world you know
[18:44]
um also new at the
[18:46]
library so the fold in the cheese
[18:49]
cooking club this is by far the coolest
[18:52]
thing going on at the library from what
[18:54]
based on what I'm hearing um this is uh
[18:59]
cooking program by average cooks for
[19:01]
average Cooks highly anticipated
[19:03]
well-received
[19:04]
program um the on-site capacity is
[19:09]
always exceeded or or met uh and then
[19:13]
thousands of people watch this live
[19:15]
stream every time um so it's it's a big
[19:19]
thing going on
[19:20]
topics have included and do include uh
[19:23]
meals for crockpots easy week night
[19:26]
dinners food for Holiday uh Gathering
[19:28]
special events and that is a popular
[19:31]
thing all right more new
[19:34]
stuff a makeer space appointment
[19:36]
scheduling patrons can book appointments
[19:39]
through self- scheduling software and
[19:42]
then the software in in turn provides
[19:44]
accurate tracking of machine machine
[19:46]
usage allows the staff to better prepare
[19:49]
for appointments the staff can offer
[19:52]
personalized uh highquality
[19:55]
customer uh interaction Service uh
[19:59]
during the maker space
[20:00]
appointments and this uh room and these amenities have helped create gifts
[20:08]
for family members items for class
[20:11]
projects it enables curiosity and
[20:15]
hobbies uh enables hobby things I've
[20:17]
used it myself for some of my
[20:19]
bookbinding projects I mean it's a
[20:21]
wonderful uh thing uh and the software
[20:26]
allows uh me to go to the website and
[20:29]
schedule an appointment and uh
[20:31]
everything's kind of seamless that way
[20:33]
all
[20:34]
right in the maker space we offer many
[20:38]
stem
[20:40]
opportunities the science technology
[20:42]
engineering math opportunities and
[20:45]
there's a large range of amenities from
[20:47]
high-tech things like 3D printers laser
[20:51]
etching
[20:53]
um uh Cricut the cricket uh drafting
[20:57]
things that which I've used
[20:59]
um and then low Tech things like a
[21:01]
sewing machine you
[21:03]
know
[21:07]
so we get that okay also new at the
[21:10]
library the the nik's own vending
[21:15]
machine this is part of the ly County's
[21:18]
nikone program vending machine program
[21:22]
and it ensured individuals in the
[21:24]
community have free access to nxo Naran
[21:28]
and other harm reduction supplies and
[21:32]
reduces barriers to Healthy Living in
[21:36]
that machine are things like Sharps
[21:38]
Containers wound care kits hygiene kits
[21:42]
condoms tap- on and I think it's on its
[21:46]
sixth or seventh uh time being refilled
[21:50]
uh so it's being used by the community
[21:53]
quite a
[21:55]
bit all right more new stuff that's keep
[21:58]
going this is fun uh recording studio is
[22:01]
up and ready to go it's open for Patron
[22:06]
reservations including a manual a
[22:08]
printed manual on how best to uh make
[22:11]
the best you know a product here there's
[22:15]
also finale of music notation software
[22:17]
program and patrons have used the
[22:20]
recording studio to record podcasts uh
[22:23]
record audio books musical
[22:26]
performances uh and more
[22:31]
also new at the library uh our steam
[22:34]
kits so the science technology
[22:37]
engineering art and math kits for kids
[22:40]
to encourage curiosity and
[22:43]
creativity this is generously uh enabled
[22:47]
by a grant through Alliant Energy who is
[22:50]
no doubt thinking about recruiting
[22:53]
future employees um and uh there are
[22:57]
books Hands-On activities including
[22:59]
puzzles games kits for themed
[23:03]
learning um the steam learning is a
[23:06]
priority for the
[23:08]
library um as you can see in the
[23:11]
Strategic plan that's in front of you
[23:13]
right now that's one of the U one of the
[23:17]
one one of part of the mission that we
[23:19]
uh feel that we want to provide to the
[23:23]
community okay so how do we pay for all
[23:27]
of this cool stuff
[23:29]
here is our adopted budget here is our
[23:33]
expended
[23:34]
amount here is our revenue
[23:37]
generated and then this is the result
[23:41]
based on careful management and skillful
[23:45]
leadership and I would also note this is
[23:48]
the third year in a row that the library
[23:51]
has come in healthly under the budget
[23:55]
that it's
[23:57]
adopted and
[23:59]
like I said good management skillful
[24:03]
leadership okay My Philosophy is that
[24:07]
every presentation needs at least one
[24:09]
pie chart so here's the first one it
[24:11]
breaks down in Broad categories the
[24:13]
designations of our
[24:16]
expenses their Staffing operations and
[24:18]
collections
[24:20]
broadly I I honestly feel that each of
[24:22]
these three categories has been
[24:24]
cultivated in a way to bring out the
[24:27]
very best and could
[24:29]
talk quite a bit about any of those
[24:32]
three um but this pie chart then uh
[24:37]
splits it a little bit more specifically
[24:39]
into how our collection uh portion is
[24:42]
divvied up so with that physical
[24:46]
materials are things like books and
[24:47]
magazines and the ebikes and the library
[24:51]
of things things downloadable materials
[24:54]
are things like ebooks electronic
[24:56]
resources
[24:58]
and then other is a category designated
[25:01]
by the State library of Iowa and things
[25:04]
like reference databases such as
[25:08]
ancestry.com resources like LinkedIn
[25:11]
learning
[25:13]
Esco and uh brain fuse which is kind of
[25:17]
a
[25:18]
um uh online tutoring job placement
[25:22]
personalized help with developing a
[25:26]
resume uh and those kinds of things
[25:29]
so uh this has been a great year I think
[25:34]
reflects some very good teamwork on on
[25:37]
the part of the
[25:39]
staff uh and very careful and uh skilled
[25:43]
management and and Leadership there so
[25:46]
I'm very excited about what the next
[25:48]
year can bring as well all right thank
[25:51]
you any questions on that
[25:54]
questions I don't have any questions but
[25:56]
I just have a comment um when people
[25:59]
talk to me not just residents talk about
[26:01]
to me about marrying but people from all
[26:03]
over the community one of the first
[26:04]
things they bring up is you guys have an
[26:06]
amazing library and um I'm a personal
[26:11]
two of the things that I just personally
[26:12]
believe in um that libraries should be
[26:15]
for I'm really happy to see within the
[26:18]
libraries mission and vision and one
[26:19]
that's providing Equitable access to
[26:21]
Residents and especially underserved
[26:23]
communities but also recognizing that
[26:25]
the modern library is the community
[26:26]
center and not just books the books are
[26:29]
super important and that's kind of the backbone of the library but as you
[26:32]
guys talked about it's the library of
[26:33]
things people are enjoying the
[26:35]
programming um and and I like being able
[26:38]
to see that mission and that Vision it's
[26:40]
very obvious that those are within all
[26:42]
of these um objective and objective
[26:46]
items on the Strategic plan and so I
[26:48]
just want to say that yeah thank you to you and the board thank you to Bill
[26:52]
and you're amazing staff because I think
[26:53]
residents not just in Maran but from the
[26:56]
whole metro area see that work in in
[26:58]
that direction and for me I personally
[27:00]
think it's just going in a really
[27:01]
positive direction seeing this strategic
[27:03]
plan I'm excited to see what you guys
[27:04]
continue to do thank you for saying that
[27:07]
I appreciate
[27:09]
that so when we have city council hours
[27:12]
there when we talk to people coming in
[27:15]
we notice at times there's people from
[27:17]
obviously from hawaa Cedar Rapids do you
[27:20]
keep track or are you able to out of the
[27:24]
total 176,000 people that visited do you
[27:27]
have a bre break down of where they all
[27:29]
come from or is that possible yes excuse
[27:33]
me we do have a breakdown um by
[27:35]
municipality as well as uh Rural and
[27:38]
County users um so we do have the
[27:40]
ability to track that and we do track
[27:42]
that I think that's an interesting
[27:44]
statistic to show that that is not just
[27:48]
drawing people from Maring but it is
[27:50]
drawing people from the surrounding area
[27:52]
to come to Maran so I don't call it
[27:55]
tourism but it is bringing people to
[27:58]
marry and so it really participates in
[28:01]
that manner and I'm absolutely shocked
[28:04]
you guys did not mention one thing or if
[28:06]
I missed it I was sleeping did you guys
[28:09]
talk about the
[28:10]
bookmobile we did not talk about the
[28:12]
bookmobile because it didn't launch in
[28:15]
fy4 well yeah but you got a stage here I
[28:18]
thought you might bring it up so very
[28:21]
briefly um I I don't know what time
[28:24]
council members arrived at City Hall
[28:25]
today but the bookmobile is in and it
[28:28]
parked outside the library today staff
[28:31]
are actively working on um fitting the
[28:34]
bookmobile with its materials and
[28:37]
Technology um we are going to have a
[28:39]
ribbon cutting planned for December 6th
[28:42]
the day of the peppermint walk um and
[28:44]
I'm working with Ryan and Rachel on a
[28:47]
sneak peek before the peppermint walk
[28:49]
for Council um likely at the work
[28:52]
session uh before the peppermint walk
[28:55]
and so I'm assuming then right after
[28:56]
that assuming after that they'll be
[28:58]
equipped ready to go and go throughout
[29:01]
the community as as another resource
[29:04]
correct and we are still finalizing our
[29:07]
hold harmless agreements um I don't want
[29:09]
to make any announcements at this time
[29:10]
as to where the stops are but we will be
[29:12]
out and about after the peppermint walk
[29:14]
looking forward to it
[29:17]
thanks Bill a question that I have and
[29:20]
it sort of um just lingers after
[29:22]
construction of the library um over the
[29:26]
last year has there been any
[29:28]
residual post construction things that
[29:31]
had to be worked through and kind of
[29:33]
what's the state of the building is it
[29:34]
now complete steady state and fully
[29:37]
operational or there's still a few
[29:39]
things that are um demanding some
[29:41]
attention the building is complete and
[29:43]
in steady state we do have one lingering
[29:46]
after effect that we have just
[29:49]
recently become aware of um the majority
[29:52]
of the construction of the building and
[29:55]
the first year that we were open
[29:57]
happened during an extreme drought
[30:00]
period with a wet spring and a wet fall
[30:03]
we're discovering that there are a
[30:04]
couple of areas where flashing wasn't
[30:07]
properly attached to the roof where the
[30:09]
outdoor Terrace meets the fireplace on
[30:12]
the second floor so we have uh a
[30:14]
contractor engaged with remedying those
[30:17]
um deficiencies other than that um the
[30:20]
building is open and operational okay
[30:22]
good that's kind of predictable stuff I
[30:24]
would think very good thanks
[30:29]
I just want to not what I really like
[30:30]
this I like I like the like the quick
[30:33]
points of the numbers I'm just curious
[30:35]
since I look on your um quick sheets and
[30:39]
the when you look at this for example um
[30:43]
Library visitors are those people who
[30:46]
actually had to check something out to
[30:48]
be considered a visitor or how are you
[30:50]
gauging visitors when I see the people
[30:53]
like say when we're doing office hours
[30:54]
or I'm there for events see a lot of
[30:56]
people wandering in and out and like
[30:58]
this number doesn't surprise me in fact
[31:00]
I guessed it could have been even higher
[31:03]
so I was just kind of curious how you estimate that number would you
[31:07]
like to answer here go ahead I mean
[31:09]
there there's there's the gate count at
[31:12]
the the metal detectors that detect
[31:15]
whether things are being carried out
[31:17]
also detect people that come in there is
[31:20]
okay and so do the is the number for the
[31:25]
program attendees in the visitor's
[31:28]
number or is that in an in addition to
[31:31]
that is included in the visitors number
[31:33]
it is so we're counting those coming in
[31:34]
for different programs yes have you seen
[31:38]
the um we've I know the community rooms
[31:41]
on the main floor see a lot of um
[31:44]
activity do the upstairs room get gets
[31:47]
rented as much as those I think about
[31:49]
the business meetings or we've
[31:51]
participated in a few other um visitors
[31:54]
that we've had discussions with but do
[31:56]
we see as much there or it mainly those
[31:59]
two main floor rooms so quite honestly I
[32:02]
haven't analyzed um compared the two
[32:04]
rooms together anecdotally I would say
[32:07]
the rooms are being used just about
[32:08]
equally um so we have varying size
[32:11]
parties that utilize the spaces the
[32:13]
overall community room can be split into
[32:15]
two um and the boardroom on the second
[32:18]
floor is a tiny bit smaller than the
[32:20]
half community room so different
[32:21]
utilizations are using the rooms for
[32:23]
different purposes but we have seen good
[32:25]
usage of the boardroom on the second
[32:26]
floor wonderful and then just one um
[32:30]
question more budget and it's not as
[32:32]
much reflective but looking
[32:34]
forward are there big changes that are
[32:38]
anticipated in requests or ways you know
[32:40]
we've kind of this kind of like the
[32:42]
first big years of being open and
[32:44]
settling in and learning how to live in
[32:46]
it and you know you start to figure out
[32:48]
oh maybe we want this or maybe this
[32:50]
works do you anticipate in the next year
[32:53]
there much shuffling or um big asks or
[32:56]
there's a big deficit we need to like
[32:59]
whether it's Staffing or a gap with
[33:01]
something else that you see coming so
[33:04]
we're actively working on the FY 26
[33:06]
budget planning now with the entire team
[33:09]
um in looking at the budget cycle that
[33:12]
we've already been through we've looked
[33:13]
at asset replacement we looked at
[33:15]
Capital Improvement requests the library
[33:17]
has no significant Capital requests um
[33:20]
for the next couple years um there are
[33:25]
minimal assets that need to be replaced
[33:27]
in the library because it's such a brand
[33:28]
new facility so to answer your question
[33:31]
as we are still settling into the
[33:33]
building I do don't see big asks on the
[33:36]
horizon um but again we're still working
[33:39]
through the budget process understand
[33:42]
right anybody think of anything else oh
[33:45]
okay I just wanted to just Echo again
[33:47]
everybody else congratulations to you
[33:49]
the board all of the members all of the
[33:52]
hard work seems like we've come a long
[33:54]
ways from standing in water in the
[33:56]
basement doors that didn't close Waters
[33:59]
that were running down the Walls um
[34:01]
seems like that's been a 100 years ago
[34:03]
so uh congratulations to everybody it is
[34:06]
a uh fantastic facility um as we all are
[34:11]
out about in the community and even the
[34:13]
communities around us there's still a
[34:15]
lot of excitement and talk about our our
[34:17]
local library and the benefits the
[34:20]
services and and like Gage said you know
[34:22]
always making it more of a community
[34:24]
center and a major Hub to our community
[34:27]
um versus the traditional uh books and
[34:30]
shelves so congratulations and we all
[34:33]
look forward to the uh next layers of
[34:35]
excitement of things that'll be rolling
[34:37]
out here in the near future so thank you
[34:39]
thank
[34:40]
you do you have anything as I turn this
[34:42]
back to you otherwise we're moving on to
[34:46]
item three thank you
[35:00]
good afternoon mayor and
[35:02]
Council as you know every other year we
[35:05]
host or conduct the national Community
[35:08]
survey um through Poco um to rage
[35:12]
resident to gauge resident satisfaction
[35:15]
and gather Community member input um the
[35:19]
last two times we conducted the survey
[35:21]
was in 2021 and then again in
[35:24]
2023 based on our results in um 202 3 we
[35:28]
were invited to apply for some awards um
[35:32]
through Poco and the international City
[35:36]
County man management association um the
[35:39]
voice of the people awards
[35:41]
recognize local governments that placed
[35:43]
a high value on Resident input
[35:46]
government performance and use that
[35:48]
Community data that they collect in
[35:51]
decisionmaking I am pleased to report
[35:53]
that Marian was selected for five of the
[35:57]
uh um awards that were presented um
[36:00]
excellence in community design
[36:02]
transformation in Parks and Recreation
[36:05]
transformation in Mobility
[36:07]
transformation in natural environment
[36:09]
and transformation in community design
[36:12]
um this window that we were uh measured
[36:16]
in um in 2021 the pandemic was um still
[36:21]
uh happening and also our street skate
[36:23]
project was still um underway and so I
[36:27]
think a lot of the success that we saw
[36:29]
um really points to that completed
[36:31]
project and the use um of our Uptown
[36:34]
District um easier access and
[36:37]
accessibility in in that project area um
[36:41]
and um then also our natural spaces so I
[36:45]
wanted to make Council aware um we have
[36:46]
five certificates that will be added to
[36:48]
our wall um of Fame in the lobby so
[36:53]
congratulations
[36:56]
[Music]
[37:00]
was that it Amber any questions for
[37:02]
Amber or any
[37:06]
comments thank you for leading that
[37:08]
survey um over the years and it's been
[37:11]
very helpful for us and given us a lot
[37:13]
of um good feedback first of all from
[37:16]
the residents but also just helped us to
[37:18]
gauge our progress and uh appreciate all
[37:20]
your work on that and this is just icing
[37:23]
on the cake to have these Awards so
[37:24]
thank you
[37:26]
absolutely I
[37:28]
congratulations to everyone whole team
[37:30]
thank you go ahead I also have the next
[37:33]
item on the agenda um just wanted to
[37:35]
give Council a quick opportunity to
[37:37]
discuss City Council Office hours um you
[37:40]
all go above and beyond and make
[37:42]
yourselves available to Residents in a
[37:43]
number of ways um and that includes
[37:45]
weekly office hours um in the summertime
[37:48]
at Toby Park um and then over the winter
[37:50]
months we move into the community center
[37:53]
um the Maran Public Library um just for
[37:56]
scheduling purposes is um wanted to now
[38:00]
that we're at the start of November
[38:02]
wanted to propose um giving you a little
[38:04]
break in between each sequence um and
[38:08]
take October off and April off but then
[38:10]
continue that Weekly presence um at both
[38:13]
of those locations throughout the
[38:17]
year are you looking for any direction
[38:19]
on that or just are you just I'm I'm
[38:21]
throwing out a recommendation interested
[38:23]
in your feedback if there's strong
[38:25]
feelings otherwise um from from my
[38:29]
perspective I I think it's fine to have
[38:33]
couple breaks like that um um I do
[38:38]
appreciate um the council continuing to U support those weekly office
[38:44]
hours I think we get a lot out of them
[38:46]
with the interaction from from residents
[38:49]
and and being able to to even if it's
[38:51]
just one person that shows up it what
[38:54]
that says to the community is that we
[38:55]
are there and available and I know that
[38:57]
we're accessible on email and lots of
[39:00]
other ways but that's a
[39:04]
visual U perception that people have
[39:06]
when they see us there they see the
[39:08]
table that says something to the
[39:10]
community that we're accessible and the the Goodwill that we earn from that
[39:16]
not only in Maran but in the region
[39:18]
whenever I tell people we do office
[39:21]
hours
[39:22]
weekly it's it's a it's invariably the
[39:25]
reaction
[39:26]
is very impressed that that that our
[39:30]
public figures are willing to do that
[39:33]
and take the time um so it earns a lot
[39:35]
of respect and credibility
[39:39]
and um positive uh Goodwill um in the
[39:44]
region for for the city as well as just
[39:47]
what we get out of it you know with with
[39:49]
the interaction with our residents so
[39:51]
again I U I know I say this every time
[39:54]
but I do appreciate the council's Comm
[39:57]
to that
[39:59]
so anyone else have anything contrary or other ideas or thoughts go
[40:05]
ahead Amber I I think I expressed to you
[40:08]
here um in the last couple of months an
[40:12]
idea of having you know two or three of
[40:16]
us there at a designated time in the
[40:20]
month make it kind of an event if you
[40:22]
will um but you know after looking at
[40:27]
every everything that's on our
[40:29]
Horizon um all of the things that we'll
[40:32]
be undertaking in the next calendar year
[40:34]
the critical issues that are going to be
[40:36]
before the community um I kind of backed
[40:39]
off of that notion and I think just
[40:41]
having us there as often as we can be
[40:44]
there each and every week throughout the
[40:47]
winter even as the mayor said even if we
[40:49]
only talk to one person that's one
[40:52]
person we would have missed and and so
[40:55]
uh being 5 years old I can change my
[40:57]
mind and uh I I just wanted to share
[41:00]
that that I've had a change of
[41:02]
perspective on that but it's really
[41:03]
given from the standpoint of um being U
[41:07]
postured to be responsive to the
[41:09]
inquiries of our community
[41:12]
so go ahead cage yeah I Echo everything
[41:15]
that mayor and uh council member Harper
[41:17]
said the the only thing I would add that
[41:19]
I think is like a really important
[41:21]
interaction from my time doing this now
[41:23]
is if people have an issue or a question
[41:28]
and they're really set on finding us
[41:29]
they're able to do that at any time um
[41:31]
email phone call but the people that we
[41:33]
catch at these that I think's really
[41:35]
important are the people walking by at
[41:36]
the farmers market or coming to library
[41:38]
and you can see it on their face where
[41:40]
they're like like they have a question
[41:41]
all of a sudden that pops in their head
[41:43]
but they're not there to see us
[41:44]
necessarily but then they come back and
[41:45]
they actually do ask that question that
[41:47]
they might not have asked in any other
[41:49]
they would have maybe gone the extra
[41:51]
effort to to send along email or a phone
[41:54]
call so I'm totally fine with the the
[41:57]
couple months off and and I'm glad I'm
[41:59]
just also saying that I'm glad that we
[42:01]
do this and I wish more City councils
[42:03]
around Iowa and around the region did
[42:05]
this as well because I think it's a
[42:06]
really important tool and from a selfish
[42:10]
perspective uh whenever I'm there with
[42:13]
another council member it's kind of fun
[42:15]
to just have that time to interact and
[42:18]
socialize with with with each other and
[42:20]
you know just talk just you know talk
[42:22]
about whatever with each other so it's a
[42:25]
that that time also is is time well
[42:28]
spent and and worthwhile
[42:30]
so go ahead no I and I agree I do like
[42:33]
taking those two off I just because I
[42:36]
enjoy the times there but I think like
[42:38]
in the summer especially even if it's
[42:40]
October even is the one off only because
[42:43]
it's not like it's just one office hour
[42:45]
at T park because sometimes there's I'm
[42:47]
at La Park every Saturday in the summer
[42:51]
um one of my colleagues is at tby park
[42:53]
one of my colleagues might be at the
[42:55]
market um at the same time so some of
[42:57]
them there's three or four of us at
[42:58]
different locations on the same Saturday
[43:01]
um and so I think sometimes when we get
[43:03]
to October it's okay to take a little
[43:06]
bit of a break but I do appreciate um I
[43:09]
really appreciate our time at the
[43:11]
library I agree with Gage I think we get
[43:14]
a lot of conversations with people who
[43:15]
aren't don't want to pick up the phone
[43:16]
and talk but when they see you there
[43:18]
they just ask that random question um
[43:20]
that they don't feel comfortable calling
[43:22]
in about so um I value them so I'm glad
[43:25]
we're continuing them and
[43:27]
think I've done my signups for few of
[43:30]
the months coming up here um not as far
[43:32]
out so thank you for setting all of that
[43:34]
up and making sure there's always
[43:35]
materials there and it's always the
[43:36]
goodie bag to open up and figure out
[43:38]
what Amber has supplied to be um the
[43:40]
giveaways of the Saturday so and no
[43:43]
suckers anymore at the library right
[43:50]
Bill anyone
[43:53]
else oh go ahead i' like to Echo like
[43:57]
when you said that it was nice when
[43:59]
there's multiple of us at one
[44:02]
location and we've been doing this a
[44:04]
long time now and that used to be very
[44:07]
common that there was always two of us
[44:09]
at the library every Saturday morning
[44:11]
and I don't know if it's is it still set
[44:13]
up where we can two people can sign up
[44:15]
for the same time or is it only one I
[44:17]
think I've limited it to one just that's
[44:20]
who I ordinate the the tote with um when
[44:24]
there's a pickup but now with the
[44:26]
library I could certainly add a second
[44:28]
one if you'd
[44:29]
like just a thought I don't know if we
[44:31]
need it on there if just people just
[44:33]
show up sometimes we had three people
[44:34]
you know sometimes there would be four
[44:36]
I'm like oh one of us got to leave so
[44:40]
yeah that happened a few times back in
[44:41]
the day anyway that's all thanks for all
[44:44]
that you do with that too Amber
[44:45]
appreciate
[44:48]
itk you need okay I do thanks Amber
[44:51]
thank
[44:58]
okay next item is uh we have Brian
[45:00]
McKenzie Capital Improvements program
[45:04]
fcal year 26 through
[45:07]
30 good
[45:09]
evening so this is our first touch point
[45:12]
with the CIP for uh fiscal year in in
[45:16]
the fiscal year 26 budget process so
[45:18]
this does a So the plan does cover the
[45:21]
fiscal years from 26 through fiscal year
[45:24]
2030 the process should look familiar to
[45:27]
what we did last year we'll present the
[45:29]
recommendations you'll see our color
[45:31]
coded list um that was in the
[45:34]
pocket
[45:38]
so this is just a little update of what
[45:42]
the a refresher of what this what the
[45:45]
capital Improvement program
[45:48]
is so our timeline here this is just the
[45:51]
CIP timeline in the budget process um
[45:57]
I just want to stress that there's no
[45:58]
decisions that needs to be made tonight
[46:01]
um we'll be presenting the staff
[46:03]
recommendation here at this meeting and
[46:06]
then you'll have six weeks to dig in
[46:09]
digest the information and then we'll
[46:11]
come back with a discussion on December
[46:14]
17th so then Finance in conjunction with
[46:17]
the city manager's office and our elt
[46:19]
will formulate the draft plan where and then we'll also work with da
[46:23]
devidson on our modeling and then also C
[46:27]
we have another uh opportunity at the
[46:29]
budget work session in January uh to
[46:32]
weigh in again before uh formal adoption
[46:36]
in the March April timeline of
[46:43]
2025 so just some key points here
[46:47]
um the thing that I wanted to highlight
[46:49]
was um you'll see the staff
[46:52]
recommendations on the next slide
[46:54]
regarding capacity if council did have a
[46:57]
recommendation for a project that they
[46:59]
would like to see
[47:00]
funded um then obviously bring that up
[47:03]
at the December 17th discussion finan
[47:07]
would analyze the funding and and and
[47:09]
the timing of the project and we would
[47:11]
try to um slot that in so an example of
[47:14]
that was we got the feedback last year
[47:17]
about the Irish drive and and tter road
[47:20]
traffic signal Activation so we took
[47:23]
that we came back we slotted it in you
[47:25]
guys um also said then hey let's move it
[47:28]
up and so we came back to the budget
[47:30]
work session accordingly so that's so
[47:32]
that's an example of how that process
[47:34]
would
[47:38]
work so your draft CIP document um that
[47:42]
was in the pocket these are the projects
[47:45]
that staff um is recommending to add to
[47:50]
the active CIP
[47:52]
projects and these are highlighted in
[47:55]
yellow on your drop
[47:57]
document sorry green you're right I'm
[48:00]
looking at
[48:01]
actually my color coding on the
[48:04]
prioritized list they're in green and I
[48:07]
put them yellow to just confuse
[48:08]
everybody on your draft document I
[48:10]
should have highlight them green to be
[48:12]
consistent with the colors they're
[48:14]
actually yellow there but I'll change
[48:16]
that to Green so
[48:18]
um just to confuse everybody so I wanted
[48:22]
to pause here um in case you have any
[48:25]
initial questions
[48:27]
about these recommendations um I will go
[48:31]
just show you the next slide so we did
[48:33]
put our Council hot on like we did last
[48:35]
year and looked at um okay what uh
[48:39]
projects which staff maybe recommend for
[48:41]
consideration stuff that's been brought
[48:43]
up in the past maybe um so we did
[48:45]
compile ADV this list for your
[48:47]
consideration and then there is the
[48:50]
unfunded list that you'll see in Gray on
[48:52]
your prioritized list in your pocket
[48:54]
that stop is not recommended for fun in
[48:57]
at this time so I don't know if you want
[49:00]
to pause for initial questions around
[49:03]
any of the projects or the process um I
[49:06]
don't know if Ryan you want to say
[49:08]
anything at this stage and uh staff
[49:10]
members are obviously here to answer any
[49:13]
initial questions but you do have that
[49:15]
six weeks and we're always open for
[49:17]
questions between now and then also so
[49:19]
yeah let's see if anyone has any
[49:20]
questions before we move on any any
[49:23]
questions anything in particular
[49:27]
okay thank you yeah so so that's all I
[49:31]
had it's really presenting this
[49:33]
information tonight I thought there was
[49:35]
more sorry no it's good so making sure
[49:37]
that everybody understands the process
[49:39]
we just wanted to make sure that you
[49:41]
have multiple touch points um that you
[49:43]
have ample time to weigh in um on on the
[49:48]
CIP for this year
[49:50]
so that's all I had right now and
[49:52]
looking forward to a discussion on
[49:55]
December 17th and
[49:57]
yep we've got a couple
[49:58]
questions um more more of a comment I
[50:02]
just want to recognize and and thank
[50:04]
everybody involved in this process um I
[50:07]
think a lot of residents don't and other
[50:09]
folks around the state don't recognize
[50:11]
the budgeting process and how much it
[50:13]
has changed here and the standard that
[50:15]
it sets now for other communities in my
[50:17]
opinion around the state of Iowa so
[50:19]
thank you to to you guys and and your
[50:21]
team and all the department uh heads for coming together and being a part of
[50:26]
really important process but I would
[50:28]
also just invite residents listening and
[50:30]
I'll continue when over coming weeks
[50:33]
when residents or other folks ask me
[50:35]
what's the what's going on in Maran
[50:37]
right now and my answer should be like
[50:38]
what's not going on in Maran right now
[50:40]
but now I'll be like the CIP like this
[50:42]
is I invite residents really take a look
[50:44]
at at this this packet I know it's
[50:46]
hundreds of pages but it's actually it's
[50:48]
really well done it's you can skim it
[50:51]
you can go as deep as you want to but
[50:52]
these are the projects that really
[50:54]
impact your neighborhoods from streets
[50:56]
to to sewers to your Parks like these
[50:58]
are the things that you actually visibly
[51:00]
see so if you if you look at take a look
[51:02]
at this list over the coming weeks and
[51:04]
you have opinions about it you know
[51:06]
reach out to to council ask questions to
[51:08]
the city departments um because these
[51:11]
are really important decisions that the council and the city make um and and
[51:17]
I'm just a personal believer that that
[51:19]
residents should be more knowledgeable
[51:20]
of of this process and and get involved
[51:23]
if they want
[51:24]
to excellent point
[51:27]
yeah I I do have a a question about one
[51:31]
project and I failed to highlight it
[51:35]
here in my electronic copy um the work
[51:39]
that was done on 31st
[51:41]
Street uh evaluating the placement of a
[51:45]
sidewalk um for the current
[51:48]
representation I don't see that listed
[51:50]
is or am I is that in a different
[51:53]
category yeah so that's not part of the
[51:55]
added CIP so these are projects that are
[51:57]
not currently in the CIP that we're
[51:59]
recommending be added to the CIP okay so
[52:02]
there's there's an additional set that
[52:05]
augments
[52:06]
this this
[52:08]
representation yep so so that's in the
[52:11]
actual octave CIP right now so you just
[52:13]
see it in the draft document okay um
[52:16]
because it's an acave
[52:19]
project and so I guess here's just one
[52:22]
question relative to the process so what
[52:25]
is present in our packet
[52:28]
today is stable for our consideration up
[52:32]
to and through this our December
[52:35]
discussion or are there other changes
[52:37]
that will be made based on staff
[52:41]
re-evaluation um the only thing that
[52:43]
might change for example uh you'll see
[52:46]
in your pocket there's a a draper park
[52:48]
there there might be a couple of change
[52:49]
orders for OCTA projects so that's the
[52:51]
only thing that would really change
[52:53]
nothing on this list will should change
[52:56]
between December
[52:59]
um okay all right but I will highlight
[53:02]
anything that changes between now and
[53:04]
then on the on the octus CIP so it's
[53:07]
very clear all right thank
[53:11]
you anything
[53:14]
else I just have to say once again this
[53:16]
entire process has been so elevated and
[53:20]
um we're we're um L years ahead of where
[53:25]
we were um
[53:27]
you know a decade ago and um just want
[53:30]
to commend everyone the whole team for um this more this methodical
[53:35]
thoughtful way of uh
[53:40]
um taking care of our business and um
[53:43]
the manner in which it's presented to us
[53:45]
so that we can it's in consumable uh
[53:48]
segments so that we can understand it
[53:50]
and uh um I just feel like we all know
[53:54]
where we're going a lot more clearly ear
[53:56]
than we used to so thank you so much
[54:00]
okay
[54:06]
yeah all right Mr Cooper are you
[54:16]
ready good evening mayor and Council I'm
[54:18]
Steve Cooper Mar and storm water
[54:20]
coordinator I'm going to give you a
[54:21]
update on our storm water master plan
[54:23]
which we just picked off recently a
[54:25]
couple weeks ago
[54:27]
so what is a storm water master plan
[54:29]
it's pretty much what it sounds like
[54:30]
it's a comprehensive plan for what
[54:32]
happens when it rains where when we get
[54:35]
rain like we did today where are our
[54:39]
trouble spots where's the rain going to
[54:40]
go where we don't have enough storm
[54:42]
sewers or infrastructure where is our
[54:44]
infrastructure not doing what it's
[54:46]
supposed to be doing where do we not
[54:47]
have infrastructure where we should have
[54:49]
infrastructure what might it cost to get
[54:52]
all that stuff to to to do what it's
[54:54]
supposed to do so that's what a stormw
[54:56]
water master plan is it's similar to the
[54:58]
recently completed sanitary master plan
[55:00]
that we did that's the sanitary master
[55:02]
plan is for the dirty water the sewage
[55:04]
water this is for the rainwater that
[55:05]
falls out of the sky HDR is the selected
[55:08]
consultant for this along with Anderson
[55:10]
bogert HDR was also the company that we
[55:13]
went with for the sanitary master plan
[55:14]
so they know our city pretty
[55:16]
well so the timeline and schedule here
[55:19]
is uh there's task 100 which is project
[55:22]
management that's pretty much ongoing
[55:23]
throughout the whole project we are
[55:25]
currently in task 200 Public Outreach uh
[55:28]
there's going to be a detention Basin
[55:30]
maintenance assessment to see all of our
[55:33]
detention Bas are our post construction
[55:35]
storm waterer best management practices
[55:37]
where are the ones that aren't doing
[55:39]
their job very well and what might we
[55:41]
need to do to make those a little bit
[55:42]
better what might that cost to get that
[55:45]
up to speed we're also in TK 400
[55:48]
hydraulic modeling I'm going to show
[55:49]
some pictures of that in a couple of
[55:51]
slides here uh future project or future tasks are capital Improvement
[55:56]
programs and uh the what do we have to
[55:59]
do where do we have to do it what do we
[56:00]
have to do and potentially what it's
[56:02]
going to cost there's going to be an
[56:04]
operations and maintenance plan for
[56:06]
public works so that we know where the
[56:07]
trouble spots are where do we need to
[56:09]
send Crews at at different times to make
[56:11]
sure that things are working the way
[56:12]
they're supposed to we are going to have
[56:14]
a storm water utility rate study da
[56:16]
Davidson will get involved so that all
[56:19]
of the information what are the costs
[56:21]
for this how do we generate Revenue to
[56:24]
make sure that we've got enough money to
[56:25]
pay for we need to do and then finally
[56:28]
we'll have the reporting for the whole
[56:31]
thing the current tasks are public
[56:34]
education and Outreach we're going to
[56:35]
have three workshops we're still trying
[56:37]
to figure out if we're going to have
[56:38]
workshops in person maybe online we got
[56:41]
to figure that out which how we're going
[56:42]
to do those there's going to be an
[56:44]
online interactive geographic
[56:46]
information map that the public or
[56:48]
anybody can log into they can put a dot
[56:50]
on a map and say Here's where I am and
[56:53]
here's what I want you to know about the
[56:54]
storm water in my neighborhood or what
[56:56]
are the flooding or the water problems
[56:57]
that we have in this area uh we're going
[57:00]
to be gathering input from everybody
[57:01]
from City staff from city council you
[57:03]
all get constit your constituents call
[57:05]
you to complain or contact you to
[57:07]
complain about storm water so you have
[57:09]
information you have knowledge that
[57:10]
needs to be included in this plan we're
[57:12]
going to be reaching out to get
[57:14]
information from the public from City
[57:16]
staff from you from Medco Whoever has
[57:18]
information we're going to gather that
[57:20]
in the coming months the task 400 of
[57:23]
hydraulic modeling that's a very
[57:24]
technical thing that that HDR will be
[57:27]
doing we've provided them with our
[57:28]
geographic information systems data all
[57:31]
kinds of other technical data so that
[57:32]
they can put that into what's called a
[57:33]
2d rain on grid model uh and and tell us
[57:37]
where our trouble spots are so that we
[57:39]
can see where the the water goes when it
[57:41]
rains and this is these are some
[57:44]
preliminary maps of what it looks like
[57:46]
so the darker blue is where we've got
[57:49]
bigger problems the lighter blue is
[57:50]
where we've got water that might not be
[57:53]
as much of a problem and then if there's
[57:55]
you know obviously the other spots don't
[57:57]
even really get the water so this is
[58:00]
kind of part of what is going to be in
[58:01]
the report again it's we just kicked
[58:03]
this off a couple months ago we are in
[58:05]
the very beginning stages of it and I
[58:07]
wanted to give you guys an update and
[58:08]
let you know this is what we're doing
[58:10]
and uh I'm kind of excited to to see
[58:12]
where it goes from here so from there do
[58:16]
you have any questions do you have any
[58:17]
thoughts do you have any input anything
[58:18]
you want to say to us about what
[58:21]
happened today with El
[58:23]
ring we appreciate the checkin and and the progress report so
[58:28]
but Steve does does the
[58:32]
modeling um incorporate any predictive
[58:36]
information from Noah to maybe say
[58:39]
regionally what we expect from seasonal
[58:42]
changes and rainfall it seems to me and
[58:46]
of course over the last six months we've
[58:49]
been very dry and then all of a sudden
[58:50]
we end up with a couple of days of
[58:52]
three-inch rains and I so I'm just
[58:55]
wondering is there anything that Noah
[58:57]
creates datawise that we can then input
[59:01]
into our uh hydrologic model to say if
[59:05]
that happens that's what it means to our
[59:07]
community just not that it's actionable
[59:11]
but it's in our mind of a condition that
[59:13]
we may need to need to need to face in
[59:16]
the future climate is always a challenge
[59:19]
because like you said we had a very wet
[59:21]
spring had a very dry summer and now
[59:23]
we're kind of back up with the rain so
[59:25]
uh trying to keep up with that is always
[59:27]
a challenge Noah and uh USGS all of
[59:30]
those different organizations that kind
[59:32]
of keep up with that uh yes that's it's definitely a
[59:37]
consideration um all of the modeling
[59:40]
like uh the new FEMA maps that we just
[59:42]
got were taking into consideration that
[59:45]
we are getting more precipitation there
[59:47]
is more water coming out of the sky so
[59:49]
yes it is being it it's it's part of it
[59:52]
uh it is not going to be a major Focus
[59:54]
but yes take that into consideration all
[59:56]
right thanks G yeah this this might be a
[1:00:00]
silly question maybe I should already
[1:00:02]
know the answer to this but when was the
[1:00:04]
last time a master plan process like
[1:00:07]
this was done in we have not done we've
[1:00:09]
done some many Watershed plans we have the Indian Creek Watershed
[1:00:15]
Management Authority that looked at more
[1:00:17]
of a kind of administrative planning
[1:00:20]
document that wasn't very technical like
[1:00:22]
this one's going to be there was a
[1:00:24]
technical um storm water plan that was
[1:00:27]
done for part of Maran in 1987 there was
[1:00:30]
the Willow Creek one that was done a
[1:00:31]
couple years ago we have not done one
[1:00:34]
for the entire city that's great then I
[1:00:37]
had no clue that this was the first ever
[1:00:39]
so that's amazing Steve yeah the number
[1:00:42]
of Master plans that this city has
[1:00:44]
undertaken in the last handful of years
[1:00:47]
has got to be very rewarding for our
[1:00:49]
citizens simply because they ought to be
[1:00:53]
very comfortable or much more
[1:00:54]
comfortable that the city is managing
[1:00:57]
these issues and not letting the issues
[1:00:59]
manage them but relative to uh the
[1:01:04]
public Outreach is the timing of those
[1:01:07]
public meetings going to be such that
[1:01:09]
those can be communicated in our next
[1:01:12]
Maran messenger because I know there's I
[1:01:14]
mean I get calls
[1:01:16]
periodically regarding this issue and uh
[1:01:20]
so I know there's some people throughout
[1:01:22]
the community very anxious to be able to
[1:01:25]
uh sit sit down and at least see what's
[1:01:27]
going on and communicate their concerns
[1:01:30]
so uh is the timing of that going to
[1:01:32]
work out yes we we will involve Amber
[1:01:35]
okay in in this to make sure that when
[1:01:37]
we have these planned that there will be
[1:01:39]
press releases it won't just be
[1:01:41]
hopefully we'll time out well with the
[1:01:43]
Maran messenger that's what I was hoping
[1:01:45]
for uh we've got lots of other ways to
[1:01:48]
get the word out as well okay all right
[1:01:50]
great thanks Steve anyone
[1:01:54]
else thank you thank you very much great
[1:01:57]
work next item is uh our review of the
[1:02:01]
upcoming
[1:02:02]
agenda first item marked on the agenda
[1:02:04]
is A8 on the second page are there any
[1:02:07]
questions on any items prior to
[1:02:13]
A8 all right Ryan A8 yes thank you mayor
[1:02:17]
uh couple meetings ago Mark sekman with
[1:02:20]
Medco Mark's here um presented the uh
[1:02:25]
capital campaign that Medco is going
[1:02:27]
through and the official request of the
[1:02:30]
city um as the the the lead investor in
[1:02:33]
Medco uh to consider uh a new level um
[1:02:38]
the resolution that would be before uh
[1:02:40]
Council on Thursday amends our uh
[1:02:43]
Professional Services agreement with
[1:02:45]
Medco to reflect that new amount in
[1:02:48]
addition um to that amount we've also
[1:02:51]
incorporated into the the um the
[1:02:54]
agreement the different benchmarks that
[1:02:57]
Mark has put together uh with the uh
[1:02:59]
Capital campaign so those are some those
[1:03:03]
are things that uh our economic
[1:03:05]
development team does review on a very
[1:03:07]
regular basis uh with our partners at
[1:03:09]
the chamber and Medco um Mark's here if
[1:03:12]
you have any questions and we can
[1:03:14]
certainly ask any questions but they're
[1:03:16]
doing great work and we appreciate them
[1:03:19]
agreed um
[1:03:21]
any questions for Ryan or mark on that
[1:03:27]
okay thanks
[1:03:29]
Mark the next item that's marked for
[1:03:31]
discussion is uh
[1:03:36]
D9 on yeah Pages aren't marked but
[1:03:41]
D9 um any item prior to
[1:03:49]
D9 okay we'll go with D9 Mr
[1:03:52]
Baro yeah so this is a contract
[1:03:54]
Amendment with Schneider and Associates
[1:03:56]
so with the $7 million that we got as
[1:03:59]
cpf funding it took it from a local
[1:04:02]
project to a federal project so there's
[1:04:04]
more Hoops that we have to jump through
[1:04:05]
more processes and so that's what this
[1:04:07]
extra money is for um being election day
[1:04:11]
we just want to call out no one in
[1:04:12]
particular but we do want to thank our
[1:04:14]
partners at the federal level that are
[1:04:16]
helping us navigate through that system
[1:04:18]
of going again from a local let project
[1:04:21]
to now a federally uh project and so
[1:04:24]
that just adds more complexity to it
[1:04:26]
there's additional steps additional
[1:04:28]
review that has to occur with that um so
[1:04:31]
we just want to thank them for uh
[1:04:33]
partnering with us to help us move this
[1:04:35]
project
[1:04:36]
forward what's the timeline
[1:04:41]
extension the timeline extension is just
[1:04:44]
because it obviously when it was going
[1:04:46]
to be let with our funds only that takes
[1:04:50]
a much shorter time frame when you start
[1:04:52]
adding NEPA and different Federal
[1:04:54]
requirements that take more ends the
[1:04:57]
timeline
[1:04:58]
y okay any any questions for
[1:05:04]
Mike and so the the additional
[1:05:07]
222,00 is that is that budgeted
[1:05:12]
or so that it is in the um it wasn't
[1:05:16]
originally planned for but when we got
[1:05:18]
$7 million in order for us to adjust to
[1:05:20]
be able to do that we have to move some
[1:05:23]
money around to make it happen
[1:05:27]
okay any
[1:05:33]
questions all right you have the next
[1:05:34]
item which is d11 Mike yep so this was a
[1:05:39]
grant that we put in for so uh
[1:05:42]
76340 was the max amount based on our
[1:05:45]
population um to the
[1:05:47]
ecbg um and so we did apply for that uh
[1:05:53]
and basically what we're going to do is
[1:05:54]
all of our black fancy poles that have
[1:05:56]
our banners on them we're going to go in
[1:05:58]
there and change out the high press
[1:06:00]
sodium lights to LED lights so not only
[1:06:03]
is it being more efficient but we're
[1:06:05]
also using less electricity we changed
[1:06:08]
the bulbs less often so we're not up
[1:06:10]
there as often um but as part of that
[1:06:14]
Grant process we have to have an
[1:06:16]
official City policy so this is adopting
[1:06:19]
said policy that's saying that as we
[1:06:22]
move forward we're going to use LED
[1:06:24]
lights on our black fancy poles instead
[1:06:26]
of High Press sodium which we've already
[1:06:28]
changed in pseudos so it's just checking
[1:06:31]
another box that's required in order to
[1:06:33]
get the
[1:06:35]
$76,000 and how I mean is it very likely
[1:06:39]
once if we adopt this policy that we're
[1:06:41]
going to get the grant or is there so
[1:06:43]
the grant has been applied for right now
[1:06:45]
it is in their hands waiting for us to
[1:06:47]
know if we get the money or not I see so
[1:06:52]
the the end of the month was the
[1:06:53]
deadline so we met that currently in
[1:06:56]
holding pattern waiting okay all
[1:07:00]
right
[1:07:03]
questions thanks Mike the next item is
[1:07:07]
under the regular agenda A2 any item
[1:07:09]
prior to
[1:07:16]
A2 hey Dave I'll go ahead and kick this
[1:07:19]
one off um this is the on Thursday there
[1:07:22]
be a public hearing on a development
[1:07:23]
agreement for uh Department Methodist
[1:07:26]
Church project the bell tower Lofts uh
[1:07:29]
as we all know 55 residential units uh
[1:07:31]
total project cost is 10 million um
[1:07:34]
through the development agreement we
[1:07:35]
will be doing um they they made the ask
[1:07:38]
for City assistance uh it'll be done in
[1:07:41]
two phases there'll be a tax incurrent
[1:07:43]
financing Tiff 10 year of 100% um and
[1:07:47]
then that'll be F that well that'll
[1:07:49]
follow the initial rebate of a 10year
[1:07:51]
100% as well uh the Tiff rebate will not exceed 475,000
[1:07:58]
and the um Urban rization abatement will
[1:08:02]
not exceed 290 or sorry be estimated at
[1:08:05]
290,000 so you're looking at around 760
[1:08:09]
uh estimated total incentive on the
[1:08:11]
project in addition to the parking
[1:08:13]
agreement there there's a parking
[1:08:15]
element to the uh development agreement
[1:08:17]
as you know we have 26 onsite spots to
[1:08:20]
the east of the classroom Wing uh they
[1:08:23]
have a secured another 13
[1:08:26]
uh leas on the Farmer State Bank side of
[1:08:30]
the U uh kind of east of the Farmer
[1:08:33]
State Bank there's that little parking
[1:08:35]
lot so they've secured 13 additional
[1:08:37]
Lots there or spots there uh working
[1:08:40]
with Daryl High what are those
[1:08:42]
agreements what does that parking lease
[1:08:43]
look like for the individual tenants um
[1:08:46]
working through that to avoid like a a
[1:08:49]
boat storage or trailer RV storage
[1:08:52]
eating up that spot uh for tenants um
[1:08:56]
assigning those spots not necessarily to
[1:08:57]
individual units on that accessory lot
[1:09:01]
but reserving them for tenants on the
[1:09:04]
rear of the site again trying to keep
[1:09:06]
some of that more long-term or
[1:09:08]
short-term parking pushed a little
[1:09:09]
further back from the uh from the street
[1:09:11]
so the residents don't have to be
[1:09:12]
affected and then obviously just keeping
[1:09:14]
the residents informed of the progress
[1:09:16]
of the project not just parking but the
[1:09:18]
entire development so that's been built
[1:09:20]
into that uh development agreement as
[1:09:22]
well and then always looking to
[1:09:25]
additional parking leases uh encouraging
[1:09:28]
that throughout the course of well just
[1:09:31]
a buildout and obviously well into the
[1:09:33]
uh future use of the
[1:09:37]
building okay I will um turn over the
[1:09:40]
meeting to the mayor proem to handle any
[1:09:42]
discussion on
[1:09:45]
this questions Steve yeah Dave um I'm
[1:09:51]
glad to see the the parking requirement
[1:09:53]
in there and I if I as I looked at at
[1:09:55]
the verbi of that talking about a
[1:09:59]
70% space requirement for the 70 70 or
[1:10:03]
70% of the 55 units as you look at that
[1:10:08]
on an ongoing basis they've got 26 on
[1:10:10]
site which means they're always going to
[1:10:11]
be looking for at least
[1:10:13]
13 how do you envision that happening
[1:10:16]
and and what kind
[1:10:18]
of enforcement if I could use that word
[1:10:22]
would be in
[1:10:23]
place at such time say Farmer State Bank
[1:10:26]
decides to uh terminate their lease for
[1:10:30]
the 13 spots and we've got this clause
[1:10:32]
in there saying they're required to have
[1:10:35]
70% so how do you envision the city uh
[1:10:39]
enforcing that section of the agreement
[1:10:43]
yeah I think as I read it it was more of
[1:10:45]
the developer will always actively
[1:10:47]
seeking to achieve that percentage I
[1:10:49]
don't know if it was necessarily A Hard
[1:10:51]
requirement to be at that 70% parked I
[1:10:53]
think it was always to be actively
[1:10:54]
pursued doing it I think it's a matter
[1:10:56]
of as if they lose the FSB lease is
[1:11:00]
working with the developer to again
[1:11:02]
identifying potential private locations
[1:11:04]
or maybe new public locations that those
[1:11:06]
can be um addressed at so it's always
[1:11:09]
going to be just working with the
[1:11:10]
developer working with L area land
[1:11:11]
owners sorry parking lot owners uh make
[1:11:15]
sure they making those connections and
[1:11:16]
discussing uh future lease options and I
[1:11:19]
just want to add to what Dave's saying
[1:11:21]
the agreement does require them to file
[1:11:24]
with the city on an annual
[1:11:26]
basis proof proof that they are actively
[1:11:29]
seeking and if they don't provide that
[1:11:31]
proof then they're not in compliance and
[1:11:34]
if they're not in compliance then we
[1:11:35]
don't have to pay the rebate until they
[1:11:38]
are in
[1:11:40]
compliance
[1:11:42]
okay sorry we're passing the microphone
[1:11:44]
here but um just one other thing too
[1:11:48]
um if you recall uh staff um on the
[1:11:52]
heels of our parking study staff asked
[1:11:55]
Council um for authorization to begin
[1:11:58]
the process of kind of planning out a
[1:12:00]
parking committee um that would be in
[1:12:04]
existence not just on an ad hoc basis so
[1:12:06]
as we continue to develop it um as that
[1:12:10]
committee when we get to that point that
[1:12:13]
committee would be charged with going
[1:12:15]
through the recommendations of the
[1:12:17]
parking study but also being aware of
[1:12:19]
things like this so that we're actively
[1:12:20]
making sure that we can plan ahead
[1:12:23]
anticipate um Vel recommendations for
[1:12:26]
council's consideration uh moving
[1:12:28]
forward and just so we can better handle
[1:12:30]
and manage those those the parking
[1:12:32]
requirements for the entirety of the
[1:12:35]
Uptown thank
[1:12:37]
you uh and just to follow up quick
[1:12:39]
little schedule I think many of you may
[1:12:41]
have saw the crane here over the last
[1:12:43]
couple days they have been working on
[1:12:44]
the uh the bell tower Loft area and
[1:12:47]
removing some of that Bree uh as well as
[1:12:50]
removing that big heavy uh stone that
[1:12:52]
was kind of hanging off the roof there
[1:12:54]
uh so they 've been doing just a little
[1:12:56]
uh kind of buttoning up a few things as
[1:12:58]
part of the uh the demolition in the
[1:13:00]
inside um the street may still be closed
[1:13:03]
or will be closed periodically uh so
[1:13:05]
you'll see um additional exterior
[1:13:09]
demolition uh probably starting in
[1:13:11]
spring so I'm going say March 2025 uh
[1:13:13]
site work early summer so
[1:13:17]
junisha but uh they've been doing Aus
[1:13:21]
remediation internal demolition uh I
[1:13:24]
don't think they found any scary
[1:13:25]
surprises they found some surprises
[1:13:27]
inside but nothing really alarming uh so
[1:13:30]
they're going to be working on that
[1:13:31]
throughout the
[1:13:32]
winter great any other
[1:13:39]
questions all right okay um the only
[1:13:42]
other item marked on the agenda for
[1:13:44]
review is uh D3 is there any item
[1:13:47]
besides
[1:13:49]
D3 that anyone would like to discuss
[1:13:51]
before we go back to that one
[1:13:57]
all right Mr barkow all right so this is
[1:14:00]
a an ordinance updating our our snow
[1:14:03]
routes and winter storm parking um so
[1:14:06]
this we're looking at it um new
[1:14:09]
Administration the new way of of doing
[1:14:11]
things out there with our new plows um
[1:14:13]
so one of the the major things we're
[1:14:15]
doing is we're taking emergency out of
[1:14:16]
it so a 3-inch snow event is not an
[1:14:20]
emergency it's Iowa um an emergency is
[1:14:24]
going to be something where we have a
[1:14:25]
blizzard and we're going to have to
[1:14:26]
split shifts and stuff like that um but
[1:14:29]
what we're going to try and do is train
[1:14:31]
the resident so if they know that
[1:14:32]
there's a 3inch or Ice event that's
[1:14:35]
coming then they need to find alternate
[1:14:37]
places to park the cars so that we can
[1:14:38]
clean the streets the best way that we
[1:14:40]
can possible we will still do press
[1:14:43]
releases and notices that go out to the
[1:14:44]
public but if we can start get getting
[1:14:47]
them trained that if the National
[1:14:48]
Weather Service says three Ines of snow
[1:14:51]
or an IC event it's automatic no parking
[1:14:55]
um we do have special parking uh decals
[1:14:58]
for those that may not have a driveway
[1:15:00]
or other means um to park their vehicle
[1:15:03]
elsewhere um we are also doing a lot
[1:15:06]
with our community so we've met with the
[1:15:09]
county twice with Cedar Rapids both
[1:15:12]
school districts to figure out are there
[1:15:15]
ways that we can do things better that
[1:15:16]
are better for the entire Community um
[1:15:19]
so we have been leading that way um so
[1:15:21]
we're changing the 2080 with ly County
[1:15:23]
on what routes we do versus what routes
[1:15:26]
they do to make it the most sense same
[1:15:28]
thing with Cedar Rapids um and then the
[1:15:31]
school districts we're looking at what
[1:15:33]
are our primary and secondary routes and
[1:15:35]
where are bus stops so when they're
[1:15:37]
trying to make that call at 5:30 in the
[1:15:38]
morning if they have school or not if
[1:15:41]
they can move that bus stop over one
[1:15:43]
block or if we can move that snow route
[1:15:45]
over if it makes sense um then maybe
[1:15:48]
they don't have to delay school or maybe
[1:15:50]
they only have to delay school and they
[1:15:52]
don't have to cancel it so then we can
[1:15:55]
have more of that collaboration between
[1:15:57]
everyone um so one thing we would like
[1:15:59]
to do is it is getting cold out um we'll
[1:16:04]
have the first reading on Thursday but
[1:16:06]
we are asking to wave the rules and have
[1:16:08]
the second and final consideration at
[1:16:10]
the next set of meetings if council's
[1:16:12]
willing to do that so that we are
[1:16:13]
prepared for winter weather when it
[1:16:16]
should come um and then we will also be
[1:16:19]
bringing we're taking we currently have
[1:16:22]
a standard operating procedure and a
[1:16:24]
policy for
[1:16:25]
smoke um we're going to combine those
[1:16:27]
two into one document and we bring that
[1:16:30]
at the same time so all the guys have
[1:16:32]
been working together to to put that
[1:16:34]
together some of the 208s may be a
[1:16:37]
little delayed so we might have to just
[1:16:38]
put the policies in there how how we've
[1:16:40]
discuss them and wait for those 2080s to
[1:16:42]
get through legal and bring those back
[1:16:44]
at a later date but we would have a new
[1:16:46]
2080 with Lyn County and we'd have a new
[1:16:47]
2080 with Cedar Rapids but those would
[1:16:49]
be separate considerations
[1:16:54]
okay anything else no any questions on
[1:16:57]
that for
[1:17:01]
Mike go ahead
[1:17:03]
Grant Mike in the
[1:17:07]
U I guess it's attached to the memo the
[1:17:11]
ordinance update or ordinances
[1:17:14]
update um in the second section for the
[1:17:17]
amendment three uh 313
[1:17:21]
d1011 winter storm parking um um in B it
[1:17:27]
just says the deputy city manager and
[1:17:29]
the Public Works director shall have the
[1:17:32]
discretion I I just want to be clear
[1:17:34]
either one of you have that authority to
[1:17:38]
put this into effect correct it's not it
[1:17:42]
doesn't have to be both of both
[1:17:45]
positions concurring with that yeah we
[1:17:47]
can add an ad or to clarify that okay
[1:17:50]
you you read my mind y
[1:17:53]
dangerous thank you
[1:17:57]
okay uh that brings us to the close
[1:17:59]
session mayor I move to adjourn to close
[1:18:02]
session regarding Personnel matters as
[1:18:04]
permitted under Section
[1:18:07]
21.51 I of the code of Iowa
[1:18:12]
second moved in second it to adjourn to
[1:18:14]
Clos session regarding Personnel matters
[1:18:16]
as permitted under the code of Iowa and
[1:18:18]
we have the legal council statement
[1:18:20]
please thank you your honor I have
[1:18:22]
reviewed the proposed subject matter for
[1:18:23]
the Clos session and find them to be
[1:18:25]
appropriate under Iowa Code section
[1:18:27]
21.51
[1:18:29]
I any questions uh before we vote okay
[1:18:35]
roll call please Mr Jensen yes Mr Harper
[1:18:38]
yes Mr misman yes mayor Oley yes Miss
[1:18:41]
mener yes Mr brand yes Mr sternad
[1:18:45]
yes thank you we're now adjourned to
[1:18:48]
Clos session thank you for joining us