Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:47]
One more.
[0:54]
Tomorrow.
[1:10]
here.
[1:22]
» My pledge is to
[1:44]
Let's pray. Heavenly Father, we thank
you for the town that we have to live
[1:51]
in. Thank you for our study leaders
tonight. Pray that you would give wisdom
[1:57]
and
be oversee these proceedings tonight.
[2:01]
Give me all the glory for it in Jesus
name.
[2:17]
self expression.
[2:42]
I
[2:45]
» I
hear we'll move on to the
[2:51]
Starting.
[3:26]
Um,
we were talking
[3:30]
and I went back last
[3:36]
priest
all said to the citizens
[3:42]
of city government they field has
forsaken him.
[3:47]
Also I want to point out that you can't
be geological but the state of war that
[3:53]
some parts of Kansas do not have enough
ground for irrigation crops livestock
[4:01]
decades of high have caused water levels
ste well
[4:08]
and I don't understand how anybody still
consider but just sit there talk about
[4:13]
data
No
[4:18]
ind industrial hygienist Keny Clark
stated their colon systems continuously
[4:23]
pick up new water contaminated with
antiques
[4:28]
bioides and anti-alias.
This water is released and flow down but
[4:34]
in the process of pumping the water back
into the into the into the spot where
[4:40]
this wast
[4:44]
is then transported from
the rivered out into the top water and
[4:51]
five stop water.
Why are we being asked to sacrifice our
[4:56]
drinking water to Google these data
centers and the main purpose is to take
[5:00]
over our jobs? We're talking white blue
color jobs people with college degrees
[5:06]
without degrees.
We are all being played by the class for
[5:12]
their enjoyment.
The strength of ocean has never come
[5:17]
from big industrial corporations.
It comes from generation of people, open
[5:22]
spaces and local businesses.
Also wanted to ensure stewardship that
[5:28]
doesn't steal the land in each its job.
Our community is even planning against
[5:33]
data centers that are invading our land.
The last thing we need is a model
[5:38]
keeping life moving data center anywhere
near.
[5:43]
He claimed that no city council member
has signed NDA. I was wondering if
[5:48]
anyone in the old wannabe city
government including the city attorney
[5:52]
passed sign I form
[5:56]
» no comment
>> nobody signed any NDAs
[5:59]
» nobody nobody
>> sure just remember one thing whoever
[6:06]
controls the food in the water controls
the masses that
[6:12]
give up our control over our necessary
human resources
[6:17]
Thank you. Thank you.
[6:37]
National School
[6:42]
has no scientific
and is known for opposition to
[6:46]
environment
while
[6:51]
clean water
[6:58]
with 50% drinking a lot of
[7:06]
chemical
[7:10]
be used in
it is called a boat.
[7:18]
I researched it and in my findings
disturbing but there
[7:27]
words that are prominent research
university
[7:33]
they are and it's
[7:41]
break down
two
[7:47]
Here's what we're saying is they cannot
film
[7:58]
this because they strong female.
[8:08]
They destroy
everything
[8:13]
basically their
job.
[8:17]
I think you can look that up and
also look up the groups that
[8:24]
27 page letter
talking about all this
[8:30]
references may I say you
start today
[8:42]
because this will say that in fact they
will get the chair we please give the
[8:48]
floor. Thank you.
[8:57]
I have regard
[9:01]
if you want
[9:39]
They're afraid of character flaws.
[9:53]
over
[10:00]
ourselves.
[10:09]
Andy looking
[10:34]
for
Thank you.
[10:41]
to do the hard work of unders
listening, being transparent and
[10:47]
following the law and earning the trust
of people that you
[11:05]
really
[11:14]
to answer questions for accountability
[11:20]
to admit.
[11:36]
We all fall short
about the important things about
[11:42]
vulnerability to 30 people
[11:48]
project
here. We will be here hopefully
[11:54]
children.
[12:04]
These ideas are all
here in town
[12:09]
generation.
[12:35]
Thank you, Mayor.
Quick update on a couple of the uh
[12:39]
electrical needs of the data center. Um
today the Kansas Corporation Commission
[12:45]
approved the transfer of the three parts
questions approved the transfer of those
[12:50]
part city service territory beverages uh
territory. So beyond now on the
[12:58]
application that the developers
submitted to Bevered
[13:05]
everything is approved by commission.
Uh the other item that we've been
[13:10]
talking about is this franchise
agreement part of franchise agreement
[13:13]
never achieved well the 20-year
agreement 4% rate. Uh this is a 20% year
[13:20]
but a 20 year agreement 5% rate and it
would go into effect as soon as
[13:26]
published
if there are questions.
[13:35]
I know
[13:51]
it's just power and that's what the
economy is
[13:58]
that's what they
so with the case
[14:05]
overall since they have
[14:15]
whatever
[14:18]
that is not technically a power sale.
They're paying for 80% of the power but
[14:24]
they're not receiving delivery. So they
would be home
[14:32]
and then their sales tax
[14:41]
it will take it'll probably take four or
five years uh for us to realize the full
[14:48]
estimated $20 million franchise fees
that we would that we're supposed to
[14:52]
realize. um it'll take four or five
years for them to get filled out.
[14:59]
» And if the data center doesn't go in,
you know, we voted out um
[15:07]
the the franchise fee stands for
whatever we have connected. Now
[15:12]
» there's there's uh I got a
virtually earlier this week I want to
[15:19]
say there was like 15 other properties
almost all
[15:24]
or south
or where our house distribution system
[15:29]
does not extend that's all
but I guess
[15:35]
if that center is notable
something else
[15:42]
Right. We had
an agreement on each server.
[15:52]
Once we transfer the service territory
that you get out, that's the average. So
[15:57]
regardless of how much power locates
those three parcels, it's going to
[16:03]
they're going to collect branches.
[16:14]
uh they could be approaching us for a
week.
[16:22]
It's actually beneficial for them to for
us to renew it when we don't have an
[16:28]
active franchise because the section of
state statute that controls what the
[16:33]
cost is if we want to acquire
um service territory on purchase. Um,
[16:41]
absent the franchise agreement, the
statutes control dictate that we pay the
[16:47]
existing provider the depreciated cost
of any infrastructure over which is how
[16:53]
we bring the state hospital on the city
system for less than $10,000. Uh if
[16:58]
there was an active franchise agreement,
then we're looking at paying them four
[17:03]
years of revenue that they could be off
of that if u
[17:34]
approving.
[17:43]
I
[18:04]
» received by asking me to get a request
from the developers and I talking
[18:11]
tonight. So, they're here to speak this
council
[18:20]
member detailed list of everything that
has been has been accomplished thus far
[18:26]
and what some of the delays have been.
Uh I would before I turn it over to me
[18:30]
and council ask questions. Um, I was
thinking putting this together back in
[18:35]
May to allow the opportunity uh to
salvage that home. Um, I didn't know how
[18:42]
long it would I didn't know how long
expect take in uh the availability of
[18:47]
engineers and all the stuff requested.
So I put 3 months in there note.
[18:53]
So with that I would answer any
questions I have here. Otherwise, we're
[18:57]
done. You can
[19:04]
stand.
[19:10]
» Yeah.
I think it's a three two or three page.
[19:15]
Maybe it's a page and a half hour, but
then there's pages of design that
[19:23]
one of whoever the engineer was dragged
[19:29]
structural sound and then also
The hospital
[20:01]
I have sequence.
So many
[20:33]
second
[20:42]
building
[20:47]
pretty
[20:52]
back.
[21:23]
over here.
[21:33]
What's
[21:51]
This would extend it out to October
31st. Is that that's going to give you
[21:57]
the time that you need?
>> Yeah. I mean, no,
[22:02]
there shouldn't be any other
[22:25]
What happened?
[23:09]
It's your authorization to allow the
project to move forward. So you put
[23:13]
whatever time limit on it you want to
put on
[23:19]
it is pretty much done.
[23:44]
Well, we're recording.
[24:04]
Can I
[24:21]
cinch their Quick.
[24:42]
Hi.
Hi.
[25:01]
September of last year
was brand at that time we met at
[25:08]
Federal's properties
uh under a development agreement uh for
[25:13]
the restoration and rehabilitation both
500 and 510 main uh We successfully
[25:19]
received the agreement and after
received it the contractors. The the
[25:23]
development contractor got into 510 and
start doing a lot more investigating as
[25:28]
to what it was going to take to make
that building structurally sound and
[25:32]
they came to the determination that
costwise going to cost way money to
[25:38]
rehab 510 going to just tear it down and
build new. Um since that time um and
[25:46]
just came in this morning I visited with
the developer uh they did their
[25:51]
crunching of numbers on a new building
and that building itself also still be a
[25:56]
losing proposition right now with the
amount of land that's available it's
[26:00]
only a 25 so go so I um so what they
have done is they they have notified us
[26:09]
that they plan to back away and I That's
probably uh
[26:16]
I I I hate to see it happen because I
was hopeful that the building would be
[26:21]
salvaged. Uh but the project itself is
not viable that there aren't two
[26:26]
buildings there and 510 is really kind
of the
[26:32]
the we link in the project that if it
wasn't going to require so much money to
[26:38]
store uh then yeah we would not be
having this conversation tonight. Well,
[26:42]
they estimated it's going to be
particular district.
[26:46]
And even then, there's still an old
building that's been retro bitted and um
[26:52]
doesn't exactly have the space that they
could could like or would like. Uh so
[26:58]
with that, I put this resolution
together. think it's in the best
[27:01]
interest of the cities to move forward
with returning the eel grant and then
[27:08]
issuing for the demolition of 10 and
it's going to have to be very delicate.
[27:12]
I don't expect that to be cheap to tear
that building down, but I would rather
[27:18]
take it down in a controlled way than
[27:22]
that.
Yes.
[27:31]
But both buildings would need to come
down.
[27:34]
» No
[27:37]
500.
So we'll probably talk that next spring,
[27:41]
but but 510. So
[27:48]
we'll be looking for somebody else.
[27:59]
states
[28:02]
different
[28:16]
I mean
I can never be sure but I just need the
[28:22]
state
will cause harm
[28:25]
500, which is why we're have to be very
careful with who we select. And it might
[28:30]
be one of those demolitions where we're
taking a death brick by brick. I know
[28:35]
we're going to go in there and excavator
stuff
[28:39]
because that would be my main I think
that's the state's concern uh is is
[28:45]
protecting 500 bank because it is a
historical gun
[28:56]
we have got
I can't remember but I've
[29:04]
5 years ago was a little more
viable.
[29:11]
5 years ago was 5 years ago, you know,
got a partially building backside.
[29:19]
Um, it's just it's exposed to the
elements.
[29:41]
service
[29:54]
resolution 1388 provide 510 demolition
510
[30:00]
building.
>> Second
[30:03]
by second
[30:12]
part.
[30:25]
Hi.
>> Hi.
[30:30]
» Hi.
[30:34]
» Hi.
[30:45]
and they are lease agreement with an
option to purchase um with an agrave.
[30:53]
Um the terms of that agreement were to
pay a city lease or rent payments on
[30:59]
that and city would credit them back on
the p for the purchase of the land.
[31:04]
what they've done and the success
they've had in their business, you know,
[31:09]
is they've been able to pay the land off
late, which they did that
[31:16]
somewhere in that neighborhood. Uh, so
we've worked through the title process.
[31:19]
Um, the title company did not like the
way the agreement is structured. They
[31:24]
said it still requires a tax law to
transfer the land. Um and now they take
[31:30]
more towards the pool. Um because it
didn't actually it was a structure like
[31:35]
a mortgage where it just became theirs.
Um I went council resolution authorized
[31:40]
actually transfer the land from the city
to the trust. So that's resolution 139.
[31:48]
just any questions. Happy to
[31:52]
We have
[32:11]
» to approve resolution.
He found
[32:24]
I
[32:32]
» Hi.
[32:52]
I mean
perfectly what
[32:57]
person
[33:03]
he
[33:06]
That help?
[34:00]
Um the only thing I have is um we did
receive our um an initial guaranteed
[34:09]
maximum price on our water treatment
plant. Um the cost of construction is uh
[34:14]
it's between 34 and 35. And the reason
I'm not saying the exact number is
[34:18]
because we're still working through some
of the line items and getting what is
[34:23]
all included in those line items
understood. So we make sure we're not
[34:27]
including too much that we don't want or
adding in not including things that we
[34:31]
do need. Um in that 34 million there's
roughly 2.6 million in contingency. Um
[34:39]
about half of that 2.6 six is in below
grade contingency. the uh the Seymar has
[34:44]
a certain amount of rock excavation that
they've included in their bid and the
[34:51]
1.3 million in contingency is in the
event they run into more rock excavation
[34:56]
than what they estimate and they would
have to justify that to not only the
[35:00]
engineer but the city in the form of I
don't want to necessarily call it a
[35:04]
change order but the council would have
to release authorized release of that
[35:09]
contingency.
Um the other uh unknown is the amount of
[35:14]
work that's going to be required at the
intake. So that number is also 1.3
[35:19]
million. Um we had a diver go in from
gardener. Um and they do these types of
[35:24]
dives regularly. That's their business.
Um is to do diving into clear wells and
[35:30]
other water tanks. um those types of
situations, intakes, uh to see what the
[35:36]
condition of those intakes are um to try
to remove some of the unknown around
[35:41]
that work and work some of that 1.3
million out of out of their contingency
[35:46]
or their allowance.
Um the Semar fee itself is about is
[35:51]
between 3 and 4 million and that's going
to be contingent on where we sign the
[35:55]
final GMP. So, at the end of the day, it
best case scenario, if we are able to
[36:01]
eliminate all of the uh contingencies
that are in the bid, our water treatment
[36:06]
plant is currently anticipated to cost
31 million, but we can't really put that
[36:12]
out there because we don't know what
type of subsurface risk there is. And
[36:17]
then also the risk uh around the uh
intake work. So, um with that, that's
[36:23]
all I have as city manager. Um, do you
have anything yet?
[36:27]
» Um, this week we released an invitation
for bid for all of the work that needs
[36:32]
to be done. Uh, that's going to be
insurance covered from the hail event
[36:36]
back in April. It took quite a while for
us to get back all of the estimates uh
[36:41]
from the adjuster uh and also just to
know everything widespread that was
[36:47]
damaged. Uh, but now we have that out
for uh any contractor who would like to
[36:52]
bid on that. We do have that structured
uh to be you can bid by building, you
[36:57]
can bid by trade, you could build a bid
a single building. Um basically whatever
[37:02]
someone feels comfortable being able to
bid on um and complete the work on, they
[37:08]
are welcome to bid that. They do not
have to bid the whole package. There are
[37:11]
20 buildings listed um or 20 pieces of
property. Uh I do want to make a note
[37:16]
500 Main is one of those. Um there is
roof repair already in that. We'll see
[37:20]
what all that covers and then we can
have more conversations about that roof.
[37:24]
But I'm really hoping that we can get
that roof solidified in a way that we
[37:28]
don't have to revisit it um after this
bid process. Uh the other thing I want
[37:34]
to mention is Brett and I did um have a
conversation with BG consultants uh to
[37:40]
ask them to do a feasibility study on
using our remaining right ofway at Carr
[37:46]
Avenue as a potential solution for a
pedestrian overpass bridge. Um as
[37:52]
council is aware, there are two problems
with the overpass. Um pedestrian access,
[37:57]
but then also just the size of the
overpass and its ability to serve our
[38:01]
community. um take on larger vehicles
and have the correct weight for the type
[38:06]
of vehicles that actually need to use it
when Main Street, Pacific, and Brown are
[38:10]
all blocked. Uh so, one thing that
they're going to examine is whether or
[38:13]
not building a new overpass structure on
that car ride ofway is something um that
[38:19]
would work for the community and be
feasible. Uh the reason we're having to
[38:23]
look at that right of way uh is because
the railroad has told us in no uncertain
[38:28]
terms are we going to be allowed to put
any kind of structure even a pier in any
[38:34]
of their right of way. Um and the right
of way that the railroad owns in town
[38:38]
basically runs
from uh where buildings start
[38:44]
uh to 7th Street uh through that whole
corridor. Um, so the current overpass
[38:50]
does have peers in Railroad Rideway. Uh,
if we were to re try and rebuild that,
[38:54]
they would not allow us to maintain
those peers or put those peers back. Um,
[38:58]
so a rebuild or a adjustment to the
existing overpass is likely not in the
[39:03]
question. Um, and then the other thing
that they have given us an option for is
[39:10]
um, potentially if we wanted to build
something over the railroad tracks, we'd
[39:16]
have to have it completely outside of
their rideway on either side. Um, which
[39:21]
obviously the ride ofway that we own is
streets that are currently open. So
[39:25]
that's Main Street, Brown, Pacific, and
we don't want to be putting a structure
[39:29]
in the middle of those used streets. So,
Carr Avenue is one of the remaining
[39:34]
swaths of rightway that we have that
we're hoping there may be something
[39:38]
feasible to do there. Um, so we're going
to start working on that and start
[39:42]
chasing some grants and some funding
hopefully from there. Um, and just keep
[39:47]
trying to figure out how to solve this
problem. Um, and I think that's all I
[39:51]
have. There wasn't something else.