Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[9:34]
Are you guys ready yet?
[9:37]
All right, let's go ahead and we're
[9:38]
going to go ahead and get started with
[9:39]
our council meeting. We did have a work
[9:40]
meeting before this. Uh just getting our
[9:43]
ducks all in a row here, so we're ready
[9:44]
to go. But welcome to our council
[9:47]
meeting tonight. We are going to go
[9:49]
ahead and get started correctly. We have
[9:52]
uh Pastor Greg Wright here from the
[9:55]
Westside Baptist Church. Also, Pastor
[9:59]
Wright serves our police department as a
[10:01]
chaplain, and I'm very appreciative of
[10:02]
that. And also just an all-around good
[10:05]
guy. Come on up.
[10:09]
>> Thank you, Mayor.
[10:11]
Psalm 145:3 says, "Great is the Lord and
[10:15]
greatly to be praised, and his greatness
[10:18]
is unsearchable." So, let's go to the
[10:20]
Lord in prayer. Father, we thank you
[10:23]
that we can approach you recognizing
[10:25]
that you are great in every way, in
[10:28]
every one of your attributes. We
[10:31]
acknowledge that and we're glad for the
[10:33]
freedom in our country and here in our
[10:35]
city to be able to pray and to seek you.
[10:38]
And tonight, we not only pray for our
[10:40]
mayor and council members in this
[10:42]
particular meeting, we're also asking
[10:45]
that you would bless our city, all of
[10:48]
the entities that are represented in
[10:50]
this, the streets, police, fire,
[10:54]
power, water, buildings, facilities,
[10:57]
just every part of what it takes to have
[11:00]
such a great city. We ask for your
[11:02]
blessing and your help. We pray for
[11:05]
wisdom for those that are making
[11:07]
decisions that you would lead and guide.
[11:10]
We pray for provision for our families
[11:12]
in this community. You provide for those
[11:15]
that are hurting, those that are weak,
[11:17]
that you'd protect them and care for
[11:19]
them. That you'd bless the righteous and
[11:22]
that you would give grace to each of us.
[11:25]
We ask again for your blessing as we
[11:28]
come to you tonight. And we pray this in
[11:30]
Jesus name. Amen.
[11:33]
>> Amen. Thank you. Um, I've asked
[11:35]
Councilwoman Natalie Larson to lead us
[11:37]
in the pledge.
[11:39]
>> Please stand and repeat after me.
[11:42]
>> Ice
[11:44]
to the United States of America.
[12:01]
All right, we uh we do have one
[12:04]
introduction we want to do. Carol, if
[12:06]
you want to come up and give us this
[12:08]
give us an introduction to Lonnie.
[12:11]
>> Mayor, council members, um we do have a
[12:14]
new employee in our planning department.
[12:17]
Um this is Lonnie Olsen. Um he comes to
[12:20]
us from Wyoming and um he's our newest
[12:22]
planner and we're excited to have him on
[12:24]
the team. You say something if you want.
[12:28]
Hi everyone. Uh, I just want to say I
[12:31]
have been here for almost three weeks
[12:33]
and I've really enjoyed it so far and
[12:34]
I'm just happy to kind of get on the
[12:36]
feet or under my feet and running with
[12:38]
this and I just appreciate you all uh
[12:41]
putting faith in me to work here.
[12:43]
>> Well, we're glad to have you here. Born
[12:45]
and raised in Wyoming.
[12:46]
>> Yep. Born and raised in Laram, Wyoming.
[12:48]
So, that's where the the University of
[12:50]
Wyoming is. And I went to school for my
[12:53]
masters in Salt Lake City at the
[12:54]
University of Utah. So
[12:56]
>> very cool.
[12:57]
>> So same weather then as Larmy here, huh?
[13:00]
>> Yeah, it's quite quite the adjustment.
[13:04]
>> Welcome.
[13:04]
>> Lonnie told me he was happy to get out
[13:06]
of the snow and he he likes to bike and
[13:08]
hike. So
[13:09]
>> very cool. We're glad to have you and we
[13:11]
have plenty for you to do. Carol, you
[13:13]
probably already figured that out.
[13:15]
>> Yeah. Welcome.
[13:18]
Uh also I do we have some members of our
[13:20]
youth city council here?
[13:23]
Did I see you? Come on up here and tell
[13:24]
us who you are.
[13:28]
» We always want to make sure you're
[13:30]
welcome here.
[13:40]
» Hi.
[13:40]
>> Go ahead.
[13:41]
>> Hi, I'm Mariah Bates and I'm just a
[13:43]
member of the city council.
[13:45]
>> Awesome.
[13:46]
>> My name is Lucas Pierce. Um I'm just
[13:48]
also a member.
[13:49]
>> And what schools?
[13:50]
>> I go to Crimson Cliffs.
[13:52]
>> George Academy. And you had a speech for
[13:54]
us, right?
[13:58]
» Yeah.
[13:58]
>> Mayor, they both just used the word.
[14:00]
They both just said, "I'm just a member
[14:02]
of the youth city council." And you are
[14:04]
a member of the youth city council. Not
[14:06]
just. You guys are really important to
[14:08]
us. So, don't forget that. And we're
[14:09]
super glad you're here.
[14:11]
>> Thank you.
[14:12]
>> Yeah. Thanks for being here.
[14:14]
All right. Let's see. Do we have any
[14:16]
other pre-aggenda items?
[14:18]
Then take us away.
[14:20]
>> Okay. There's one change this evening,
[14:21]
Mayor. And item number seven will be rem
[14:24]
be removed from the agenda this evening.
[14:26]
Um item number two is consent calendar.
[14:28]
There's 13 items on the consent calendar
[14:30]
this evening. Uh staff has reviewed each
[14:33]
of these administrative items and
[14:34]
recommends approval. However, if the
[14:36]
city council would like to remove any of
[14:38]
these for specific consideration, we can
[14:40]
accommodate that. Otherwise, staff
[14:42]
recommends approval.
[14:44]
>> Mayor, I would like to remove item G and
[14:48]
then I can make a motion that we approve
[14:50]
the calendar. with that removed if
[14:52]
that's okay with you.
[14:53]
>> Yep.
[14:53]
>> Okay. So, I'll make a motion that we
[14:55]
approve the consent calendar as um
[14:58]
presented, removing item G for
[15:00]
discussion.
[15:02]
>> I'll second that motion.
[15:04]
>> So, we have a motion by Danielle and a
[15:06]
second by Michelle removing item G and
[15:08]
then to approve the consent calendar.
[15:10]
All in favor say I.
[15:12]
>> I.
[15:13]
>> Any opposed? Motion carries.
[15:18]
And item G.
[15:20]
>> Okay. So Cameron, do you mind coming up?
[15:22]
We sent Cameron I think the entire
[15:24]
council has been talking to Cameron, not
[15:26]
just me about this and we've received
[15:28]
quite a few letters. So we just I asked
[15:31]
Cameron if he would address the
[15:32]
questions tonight. Thank you.
[15:41]
» I've got to pull it up. Sorry about
[15:42]
that.
[16:08]
Okay.
[16:10]
Uh so these are questions that were
[16:12]
brought up um by a contractor um
[16:16]
regarding our bid. Um and then I
[16:18]
provided uh some information in email.
[16:22]
So, first uh city code section uh 1
[16:25]
10B6B requires a written statement of
[16:28]
reasons approved uh by the city manager
[16:30]
and city attorney. How uh whenever an
[16:32]
award is not given to the lowest bidder,
[16:35]
does that statement exist for this
[16:36]
project? And can the council uh see it
[16:39]
before voting? So there's a section in our procurement uh ordinance that
[16:44]
indicates if you're not going with the
[16:46]
low bid uh provide the justification in
[16:49]
our procurement standard or our
[16:51]
procurement or uh ordinance. There are
[16:54]
11 reasons or 11 criteria that the that
[16:57]
staff is supposed to look at when also
[17:00]
looking at the price. Uh they pertain to
[17:02]
can the is the contractor qualified? Uh
[17:05]
can they perform the work? What's their
[17:07]
integrity? What's their character?
[17:08]
what's there financially? Can they do
[17:10]
that? And so if you don't go with a low
[17:12]
bid, we provide as a department head, we provide the the justification for
[17:17]
that. In this case, we I did send an
[17:19]
email to uh uh city manager and to city
[17:24]
attorney uh to be able to indicate,
[17:26]
okay, on this project, we actually
[17:28]
scored the the George Washington
[17:30]
Boulevard uh roadway. And I probably
[17:32]
should indicate this is for the the item
[17:35]
G uh George Washington Boulevard roadway
[17:37]
the the roadway portion of it. We
[17:39]
received nine bids um of which we scored
[17:43]
the four criteria past performance uh uh
[17:48]
qualifications. That's the past three
[17:49]
projects or similar projects the
[17:51]
contractor was supposed to provide us uh
[17:53]
their bid amount and their schedule. Um
[17:56]
so those four criteria were scored five
[17:58]
points, five points, 50 points and 40
[18:00]
points. the schedule being 40 points and
[18:02]
the bid being 50 points the other five
[18:04]
points. So, uh we scored this project
[18:07]
according to that criteria that we
[18:09]
provided for the information for biders.
[18:11]
Um so I I did provide an email um to our
[18:15]
city manager and city attorney
[18:17]
indicating this is how we scored uh
[18:19]
these projects. That was to answer that question. Uh another question, the
[18:24]
second question, can the category level
[18:26]
scores for all nine biders, uh work
[18:28]
qualification, past performance, bid
[18:30]
schedule, construction schedule be made
[18:32]
part of the record before the vote? The
[18:34]
packet contains only scores. We put in
[18:36]
the packet the total score of uh for the bids that we rank these uh
[18:43]
these bids. We did not put out to the
[18:45]
public all of those categories because
[18:47]
there was some subjectivity in them. um
[18:49]
the past performance of a contractor. We
[18:52]
didn't want to hurt um reputation of a
[18:55]
contractor. We didn't want to put that
[18:56]
out to the public. Um we recognized that could um be detrimental to a a
[19:02]
contractor. So, we provided the full
[19:04]
score of those contract of those biders
[19:06]
uh in the in the public packet so that
[19:09]
the the public could see that. Um, we
[19:12]
intend to provide that score that that
[19:15]
score sheet to the contractors so that
[19:17]
if they wanted to get feedback from uh
[19:19]
staff that we could talk about that with
[19:21]
them. Okay, you didn't score very well
[19:23]
here. You did score here. Here's the
[19:25]
reason why. And and talk that through
[19:27]
with them if they decided to want to
[19:28]
come and talk to us. um for the awarding
[19:32]
contract section of the bid documents
[19:33]
paragraph 4. This is in the information
[19:35]
for biders states that award will be
[19:38]
made to the lowest responsible bidder as
[19:40]
determined by the city using the
[19:41]
criteria contained in city ordinances
[19:44]
governing the award of contracts. How
[19:45]
was that provision applied to this
[19:46]
recommendation? it. That paragraph in
[19:49]
the information for biders was actually
[19:51]
corrected by an addendum and it
[19:53]
identified that the the the award of the
[19:56]
bid will actually be to the highest
[19:58]
ranking contractor or highest ranking
[20:00]
bid as determined by the four uh
[20:03]
categories listed in the information for
[20:05]
bid. When the question came up, I don't
[20:07]
think the contractor actually realized
[20:09]
that um didn't go back and read the the addendum where it was corrected. uh
[20:15]
that acknowledgement of the amendment,
[20:17]
the receipt and reading of it, they have
[20:19]
to click a yes on the on the uh digital
[20:22]
bonfire, the program where they submit
[20:24]
the bids before they can submit a bid.
[20:26]
And so whether or not they
[20:29]
well in the questions, they didn't
[20:31]
acknowledge that it was changed in the addendum. Uh let's see for
[20:35]
context on question two.
[20:37]
>> Hang on a second, Cameron. I need to be
[20:39]
clear on that.
[20:41]
So,
[20:42]
in order to submit a bid in Bonfire,
[20:45]
they would have needed to click that
[20:46]
they had received the addendum. Correct.
[20:50]
>> And read it. Yes.
[20:51]
>> And read it. That's what they're
[20:52]
acknowledging. So, they can't submit a
[20:55]
bid unless they click that.
[20:56]
>> Correct.
[20:57]
>> So, whether they actually read it or
[20:59]
not, they all we know is that they click
[21:02]
the button.
[21:03]
>> Correct.
[21:03]
>> Okay. Thank you.
[21:04]
>> Yep. And then uh question
[21:07]
this other question for context on
[21:09]
question two. I asked staff for these
[21:11]
records in writing and I was told they
[21:13]
uh will be provided through a grammar
[21:15]
records process whose process or
[21:17]
response deadline falls after Thursday's
[21:19]
meeting. My understanding is because of
[21:21]
grammar laws and um and our city
[21:25]
recorder provided a good response to
[21:27]
this in in an email that we uh could not
[21:30]
give those those scorings out to the
[21:32]
contractor until after the bid is
[21:34]
awarded. Um and there's there's reasons
[21:37]
for that, but yeah, basically it falls
[21:40]
under grandma laws. Um
[21:43]
let's see. One item to note is I know
[21:47]
that we took this bid. This was the
[21:49]
first time that we did it in public
[21:50]
works and scored the bids with these
[21:53]
four criteria past performance uh work
[21:56]
qualifications bid and schedule. Um the
[22:00]
schedule was the question hey how why
[22:03]
can uh you score this thing based on uh
[22:06]
time. Please note that that this has
[22:09]
been going on uses this um in their uh
[22:13]
contracting and awarding of contracts
[22:16]
all the time. Bluff Street was actually
[22:18]
awarded price plus time. The the lowest
[22:20]
bid on the Bluff Street project or the awarded contractor was not the
[22:26]
lowest bid.
[22:27]
>> Cameron, was that part made clear in the
[22:29]
con in the bid um request in the bid
[22:32]
documents that you were going to be
[22:34]
doing
[22:36]
>> that that procedure. What's it called?
[22:38]
Plus time.
[22:39]
>> Price plus time.
[22:40]
Is that obvious?
[22:41]
>> That's the title that UD do uses. It's
[22:43]
price plus time contracting.
[22:45]
>> In our bid, we put it as four uh four
[22:49]
criteria that they were going to be
[22:50]
scored on and they were going to be
[22:51]
ranked based on those four criteria. And
[22:54]
so the idea of hey, you can't can you
[22:56]
award a bid with award and a bid uh a
[23:00]
bid with time and cost. U does it all
[23:03]
the time. They did it on Bluff Street.
[23:05]
The the awarded contractor was not the
[23:08]
lowest bid. They were the faster uh
[23:10]
bidder. Um, and so that that price
[23:13]
element and time element was awarded
[23:16]
together to be able to award that to the
[23:17]
lower or to the lowest responsible
[23:20]
bidder. Um, I recognize that that uh
[23:24]
there's been questions. Hey, we didn't
[23:26]
understand this. We didn't understand
[23:27]
that you were going to score it this
[23:28]
way. We actually had a mandatory pre-bid
[23:30]
meeting in this project where all of the
[23:33]
contractors that bid, the nine contracts
[23:35]
that we bids that we received, they were
[23:37]
all present. um they had a
[23:38]
representative there um where we
[23:40]
actually talked about this very thing
[23:42]
and how we were going to score it. And
[23:44]
then during the the bid period after
[23:46]
that pre-bid pre-mandatory bid meeting
[23:49]
um all the contractors had uh time to
[23:52]
send questions to the city uh
[23:54]
engineering staff and we answered their
[23:56]
questions. It wasn't until after the bid
[23:58]
was received then they started asking,
[24:00]
"Hey, wait a minute. Um can you do this?
[24:03]
I I I don't understand this." Cameron,
[24:05]
with those four categories, was it clear
[24:09]
the weight that would be given to each
[24:11]
category? How many points for each one?
[24:14]
>> No. And that's a good question because
[24:16]
it was brought up, well, hey, what if
[24:17]
you wait the time? Um,
[24:21]
uh, I'll give you an example. So, we
[24:23]
never spelled out the bid amount that
[24:26]
one contractor versus another based on
[24:28]
their bid amount was going to score
[24:30]
different than 50 50 points. We we never
[24:32]
spelled that out in the contract. uh
[24:34]
because we we figured well that's
[24:36]
inferred because we're ranking you based
[24:38]
on these four category up to 50 points,
[24:40]
40 points, five points and five points.
[24:42]
So we never spelled that out in the
[24:44]
contract time, the schedule. We did not
[24:46]
spell it out. We didn't spell it out
[24:47]
with the the performance five points and
[24:49]
the the work qualification five points
[24:52]
either. Um and and maybe that's
[24:54]
something that our staff needs to put a
[24:56]
little bit more clarification in to say,
[24:58]
hey, the time the faster you bid it, the
[25:01]
more score points you're going to get or
[25:02]
the slower you bid it. um it's it's not
[25:05]
you're not going to score as well. But
[25:06]
we didn't do that for the bid either. We
[25:08]
didn't uh call out that, hey, if you
[25:10]
give us a a a
[25:13]
less bid, you're going to score higher.
[25:15]
We didn't do that any of that.
[25:16]
>> But Cameron, did you have I'm confused
[25:19]
by your answer. So, did you have that
[25:20]
time was 40% or 40 points?
[25:24]
>> 40 possible points.
[25:25]
>> So, you did have you did have the point
[25:29]
allocated to each one of those items.
[25:31]
>> Yes. I apologize if I'm not uh clear on that. But so 40 points possible
[25:37]
for the schedule, 50 points possible for
[25:40]
the bid, five points possible, and five
[25:42]
points possible for both the past work
[25:44]
experience and uh quality of work.
[25:47]
>> I think that's where the disconnect
[25:49]
happened was
[25:51]
that time that time change that that was
[25:55]
going to be such a significant thing
[25:57]
when we've when I've communicated with
[25:59]
these contractors.
[26:02]
And so I guess that's the question is do
[26:06]
you feel that was clear to those
[26:07]
contractors that that that was I mean
[26:10]
time yes it was going to be completed on
[26:12]
time but that it was going to score so
[26:14]
heavily in their favor if they got the
[26:17]
job done early.
[26:19]
>> I feel like it was clear we received
[26:21]
nine bids and all of those nine bids had
[26:24]
different time periods on them a
[26:26]
different schedule. I can start this
[26:29]
time and end this time. They all had
[26:30]
different days that they were going to
[26:32]
be working. They were not all the same.
[26:34]
They didn't go to just the minimum time
[26:37]
period that we indicated in the bid.
[26:38]
They all gave me different time periods.
[26:40]
Um I feel like it was was understood. Um
[26:44]
we talked about it in the pre-bid
[26:45]
meeting. We talked about it in the
[26:46]
addendum um to clarify how it was going
[26:48]
to be awarded. I felt like it was. I
[26:50]
know that's could be subjective. Um but
[26:53]
I I think me and my staff I think we
[26:55]
communicated that with them. So, we had
[26:57]
a minimum time period placed in there.
[27:00]
And was that minimum time period, if
[27:02]
they put that date on their application,
[27:05]
was that awarded a zero or how many
[27:08]
points?
[27:09]
>> How did we track that?
[27:10]
>> We took uh the the quickest time was
[27:12]
March and the slowest time was back into
[27:15]
September. And we
[27:16]
>> So, we based what they submitted to us,
[27:18]
not based off of our minimum time,
[27:21]
>> based on what they submitted to us. And
[27:23]
so the fastest uh time received a
[27:26]
40point score. The slowest time received
[27:28]
a like a fivepoint score and four people
[27:30]
scored it and and then it averaged those
[27:32]
numbers together.
[27:35]
>> Okay. Yeah, I can see where the
[27:37]
confusion would be there with that wide
[27:41]
discrepancy of, you know, I can see the
[27:44]
frustration if I'm putting in the bid
[27:46]
not realizing that wide discrepancy
[27:48]
there.
[27:50]
>> Yeah.
[27:51]
Other
[27:53]
questions? I can clarify some more. Um
[27:58]
I tried to calculate it differently if
[28:00]
uh so the bonfire actually provided the
[28:03]
scoring for the bid. Uh staff did not
[28:06]
provide that. That was just set based on
[28:07]
a formula. I I actually took that same
[28:10]
formula and applied it to the days that
[28:11]
the contractors provided this used that
[28:14]
formula and the top four biders didn't
[28:16]
change even using so where where the
[28:20]
bonfire program squished scores together
[28:24]
so that out of 50 points the lowest
[28:26]
score was like uh 32 points point
[28:28]
something and so it pushed those scores
[28:30]
together as as staff scored those the timetable of that the schedule um
[28:36]
and it stretched it out because 40
[28:38]
points versus five points. Um, I redid
[28:41]
that calculation just to see if it
[28:42]
changed it and it didn't change the top
[28:44]
four scores based on the same formula
[28:46]
that was used in Bonfire for the
[28:48]
schedule. I used that and it again, it
[28:51]
didn't change it.
[28:53]
So, based on what the contractor
[28:54]
submitted to us for their their
[28:56]
schedules,
[28:58]
the the top four bids didn't change.
[29:01]
>> And this is the first time we've done a
[29:03]
bid this way. Is that correct?
[29:05]
>> Correct. I I should explain that uh in
[29:08]
over the years as we bid using our
[29:10]
procurement standard where we look at
[29:12]
the lowest bid but we're also supposed
[29:14]
to look at some of these other criteria
[29:17]
um a lot of bids not all of them but
[29:20]
just some of them here and there if they
[29:21]
didn't provide us the the information we
[29:23]
wanted a clear uh concise information
[29:26]
they would be rejected um in this case
[29:29]
we didn't we didn't reject any of them
[29:31]
because we knew we were scoring them um
[29:33]
if I looked at those criteria and they
[29:35]
didn't provide all of the information
[29:36]
that we were looking for. Some of them
[29:38]
may have been rejected, but we scored
[29:40]
them because we identified that we were
[29:42]
going to score them.
[29:43]
>> Would any of the top uh contractors be
[29:47]
uh thrown out?
[29:49]
>> Could be.
[29:53]
But again, we just scored them.
[29:55]
>> I have another question regarding
[29:57]
timing.
[29:59]
This road does not exist. It's not
[30:01]
replacing a road. It's going to help
[30:03]
alleviate traffic.
[30:05]
when you're looking at that bid process,
[30:07]
where does money come into play with
[30:09]
that $1.4 million difference in bid
[30:12]
price because it's not in front of a
[30:15]
school, a hospital, not the boulevard
[30:19]
getting replaced. So why the sense of
[30:21]
urgency? The timing was so critical on
[30:24]
this bid.
[30:25]
>> So I'll explain two things on that. So
[30:28]
um we have the bridge that's under
[30:30]
construction right now. The contract
[30:31]
time for that bridge goes until July,
[30:33]
middle of July, around July 15th. Um,
[30:36]
the current contractor working on that
[30:38]
bridge is going to finish well before
[30:39]
that timetable. So, um, as staff had
[30:42]
looked at, um, when can we finish this roadway, we knew that the bridge
[30:47]
was going to be done and the
[30:48]
intersection over by the Dixie Center
[30:50]
where it's just Crosby Way right now and
[30:51]
just a through roadway, it's going to
[30:53]
change to a T intersection. And we knew
[30:55]
that that was going to be a delay. that
[30:57]
was going to be an issue with drivers
[30:58]
driving that going through a traffic
[31:00]
signal without the bridge open. So, we
[31:02]
tried to look at ways to accelerate the
[31:04]
construction of this roadway. One of
[31:06]
them was we we bid out the pedestrian
[31:08]
bridge that's on the roadway section. We
[31:10]
bid it out earlier because that was
[31:12]
going to be a critical path delay for
[31:14]
the roadway. Um, and so when we looked
[31:17]
at the roadway portion, the reason why
[31:19]
we tried to accelerate the schedule and
[31:21]
score it according to a schedule is
[31:23]
because the bridge was going to be done
[31:24]
a lot sooner. Um, and we didn't want
[31:26]
that bridge just being out there
[31:28]
finished, completed and Crosby Way into
[31:30]
a T intersection without the roadway
[31:32]
connected. Um, that was the reason why
[31:34]
we actually pushed it to get that done.
[31:37]
Um, to your question about the $1.4
[31:39]
million, the the difference between the
[31:41]
low bid and the high bid, even talking
[31:43]
with the the contractor for the low the
[31:45]
lower bid amount, um, asking him about
[31:48]
the time schedule, he responded to me
[31:49]
that, oh, if I wanted to accelerate this
[31:52]
schedule, I could do it also. I would
[31:54]
just have to add more people, which
[31:55]
means that the bid cost would go up. So,
[31:58]
to your question, I couldn't just throw
[32:00]
out the the schedule the the scoring of
[32:02]
this uh schedule and not even account
[32:05]
for it and use those bids because those
[32:07]
bids are accounting for the time that
[32:09]
the contractors are actually uh building
[32:11]
it. And so, even though um that $ 1.4
[32:15]
million difference between them, if it
[32:18]
wouldn't be that much savings if we
[32:20]
tried to make them all go with the same
[32:22]
schedule. And so you can't really throw
[32:24]
out the time period and and get those
[32:28]
bids. You can't do that. So the 1.5 uh
[32:31]
1.4 million reflects that you're getting
[32:33]
a faster schedule on the construction of
[32:35]
the roadway.
[32:39]
» We're also going to have some disruption
[32:41]
on I-15
[32:43]
coming very shortly. So this road will
[32:45]
be crucial.
[32:47]
>> True.
[32:51]
Cameron, do we know when they're going
[32:53]
to start the I-15 expansion and raise
[32:57]
project?
[32:57]
>> Let's see. They just told me and I I
[32:59]
don't have that in my head, but it's
[33:00]
within the next month or so they're
[33:02]
going to get those bids received. U is
[33:06]
so they stopped the advertisement of bid
[33:08]
first part of the summer. They started
[33:10]
that, stopped it, and they wanted to
[33:11]
wait for the grant that they had put
[33:13]
into the federal government, a $25
[33:15]
million grant that they got like 23 and
[33:16]
something million.
[33:17]
>> Midepptember is what they said in that
[33:19]
meeting.
[33:19]
>> Midseptember
[33:20]
>> for bids. Yeah.
[33:21]
>> So, they will receive those bids and
[33:23]
then uh award that and it's going to
[33:25]
start could be this year, could be this
[33:27]
calendar year.
[33:32]
» Just a little clarification just so I I
[33:36]
want to be very clear that there's a
[33:39]
several all these contractors in fact
[33:41]
have been very good community partners.
[33:43]
Um that's what makes this a little tough
[33:45]
because you're sitting there, man, I
[33:46]
wish we could give it to all of them. Uh
[33:48]
they've been good community partners.
[33:50]
they've done a lot of good work in the
[33:52]
community. Um, some of them I know
[33:54]
personally, most of them I know at least
[33:56]
someone there that works for them
[33:58]
personally. And so you there's a whole
[34:00]
ramification of getting a job and not
[34:03]
getting a job. And I I feel that. So I
[34:05]
just want that to be very clear that
[34:07]
this these are I still want all these
[34:10]
contractors to know that they're are
[34:11]
very good community parters partners and
[34:13]
at the end of the day regardless of what
[34:15]
happens here
[34:17]
only one of them is going to get it. And
[34:19]
so, um,
[34:22]
I I just keep that in mind. I just
[34:24]
wanted to make sure those contractors
[34:25]
knew no, there's no there nothing
[34:26]
nefarious going on here. This is just
[34:28]
simply what we're trying to get a road
[34:30]
done at the best possible price.
[34:33]
Well, and just to clarify, Cameron,
[34:35]
because transparency obviously is very
[34:38]
important with this, and you did mention
[34:40]
with grandma request laws that we were
[34:43]
not able to release the information
[34:46]
until after um a bid is awarded
[34:49]
essentially. So, is this does the city
[34:53]
intend to go ahead and release this
[34:55]
information so that the contractors can
[34:57]
have all of the information that was
[35:00]
requested?
[35:01]
>> That that I believe is what our intent
[35:04]
is. Yes.
[35:05]
>> Okay.
[35:06]
But the reason why it wasn't put into
[35:08]
the packet is for protection essentially
[35:11]
of the companies and because of that
[35:14]
scoring system partially being based off
[35:17]
of past experience. We didn't want to
[35:20]
have anything put out there potentially
[35:23]
negative for a company. Is that am I
[35:25]
understanding that correctly?
[35:27]
>> Correct. We would we're intending to
[35:29]
meet with the contractors to to give
[35:30]
them some feedback if they wish it.
[35:33]
>> Okay. Yeah. because I think that's this
[35:35]
is a tough one for me because the
[35:37]
transparency aspect is so important and
[35:39]
when we're going out to bid we want to
[35:42]
make sure everything is transparent and
[35:44]
well understood and obviously we as
[35:46]
wanting to be good stewards of tax
[35:48]
dollars want to assure that we're
[35:50]
getting the best price we can but also
[35:52]
time is money as well so I understand
[35:54]
factoring in those other aspects but
[35:57]
having it be as clear as possible when
[36:00]
we are going out to bid and it sounds
[36:02]
like with this being the first time
[36:04]
doing it this way, I I can see where
[36:06]
there was some confusion. So, that's why
[36:08]
this one is is tough for me.
[36:12]
>> Thanks, Cameron, for answering all those
[36:14]
questions. And it sounds like you're
[36:15]
already planning to meet with all the
[36:16]
contractors afterwards. I think that'll
[36:18]
be great, especially with us doing this
[36:20]
new process so they can give us some
[36:22]
feedback and we can make sure that
[36:24]
there's clarity because like the mayor
[36:26]
said, these are all good companies. We
[36:28]
want to continue working with all of
[36:29]
them. We want them to be successful in
[36:32]
their bidding processes and we want to
[36:33]
make sure that we're not hanging them up
[36:35]
in any way on that. So, um, with that,
[36:38]
mayor, I'll make a motion if you're
[36:40]
ready, unless anybody else
[36:41]
>> just give one to give legal a second
[36:43]
here before you do that.
[36:44]
>> Okay. Sure.
[36:45]
>> Thanks.
[36:46]
>> Thank you, Mr. Mayor and members of the
[36:47]
city council. I do want to make you
[36:49]
aware and I think you are aware that the
[36:51]
city did receive a formal protest today
[36:54]
under the procurement code which is 10-
[36:57]
or sorry 1-10B-6
[37:00]
of our city code. Unfortunately, that protest was required to be
[37:05]
submitted within 72 hours of the bid
[37:08]
tabulation when it was when it was uh
[37:13]
given, which depending on the date you
[37:16]
use, at the latest it would have been
[37:18]
Saturday morning at 9:00. So, this
[37:20]
protest didn't come in in time. However,
[37:24]
I do want to let those in the audience
[37:26]
that are interested um know that um
[37:30]
certainly if the if the bid is awarded
[37:33]
tonight and a contract sign, once the
[37:36]
contract is signed, we can release the
[37:38]
here24 protected grammar documents and
[37:41]
we can get those out. But it also allows
[37:43]
for an appeal process under title one
[37:46]
chapter 15 of our city code as well. Um,
[37:49]
so it's not the end. If there are those
[37:52]
that want to appeal the decision, um,
[37:54]
that decision can go to the
[37:56]
administrative law judge. So,
[37:59]
sorry to be clear then, just sorry,
[38:01]
Danielle, before you make your motion,
[38:03]
can you one of you two give us the
[38:06]
ramifications of one way or the other of this decision denied or approved?
[38:12]
>> Right. So again, if if the decision is
[38:15]
denied tonight, um then the process has
[38:18]
to start over and we have to redo the
[38:21]
entire bid process. If the uh if the
[38:25]
award is granted as as recommended or
[38:28]
approved as recommended, then the city
[38:31]
proceeds with um the contract. Um there
[38:34]
is an appeal process available. Um, if
[38:38]
it does get appealed and goes to the
[38:40]
administrative law judge, again, if the
[38:42]
administrative law judge upholds the
[38:44]
city's action, then the the project
[38:47]
proceeds, continues to proceed. If the
[38:49]
administrative law judge disagrees and
[38:51]
says, "No, we did it wrong," then again,
[38:54]
it goes it's a doover basically, then we start again.
[38:58]
>> Okay, that clear? Any questions on that
[39:00]
for
[39:02]
Jamie? All right. Any other discussion?
[39:07]
>> I have one question for Jamie. Based on
[39:09]
my research, that decision by the
[39:11]
administrative law judge would need to
[39:13]
be within two weeks. Sec.
[39:15]
>> So, under the procurement code, there
[39:17]
was a time limit under under the appeal
[39:20]
provisions that I'm talking about.
[39:22]
There's a time limit on when to file
[39:24]
that appeal and it's a fairly quick one,
[39:26]
but then it goes uh then there's a
[39:28]
process through the through the
[39:30]
administrative code.
[39:31]
>> Thank you.
[39:34]
Okay. Any other questions?
[39:38]
Not then.
[39:40]
Danielle.
[39:41]
>> Yeah. Mayor, I'll make a motion that we
[39:43]
approve item G from the consent calendar
[39:47]
um the contract of JP Excavating, Inc.
[39:50]
to construct the George Washington
[39:51]
Boulevard from Virgin River Bridge to
[39:54]
River Road Product.
[39:57]
>> I'll second.
[40:00]
>> Is that you, Steve? Sorry. Oh, Austin.
[40:03]
Okay, we have a motion uh by Danielle, a
[40:06]
second by Austin
[40:09]
to approve item G. All in favor say I.
[40:13]
>> I. I.
[40:14]
>> I.
[40:15]
>> Any opposed?
[40:17]
Motion carries unanimously.
[40:22]
This this meeting's kind of got some
[40:24]
oddities to it, so I'm going to be uh
[40:26]
stepping out and turning the meeting
[40:27]
over for this next item to Danielle.
[40:34]
So item number three is a public hearing
[40:36]
consideration of ordinance number
[40:37]
2026-063
[40:39]
annexing property and in the city of St.
[40:42]
George and adjusting the corporate
[40:44]
boundary lines to include 2.277
[40:47]
acres located at the intersection of
[40:49]
3430 east in St. George and 39
[40:54]
30 south in Washington city.
[40:57]
>> Okay. So, at the city council meeting on
[41:00]
May 28th, 2026, the city approved a
[41:05]
resolution a resolution to hear the
[41:08]
annexation. So, that put in time that
[41:11]
put in place a time frame now that they
[41:13]
had to go through a process to look at
[41:15]
the annexation. So, tonight is just now
[41:18]
the now to come forward and approve the
[41:22]
annexation, approve an ordinance uh for
[41:24]
the annexation.
[41:30]
That's it. [laughter]
[41:32]
>> Okay.
[41:34]
Um, since since this is um a property
[41:38]
belonging to our mayor, I just want to
[41:40]
make sure that we um go through the
[41:44]
process exactly as we should so that we
[41:46]
don't have any questions. Um, so I will
[41:50]
read to you what it says from our um
[41:53]
annexation policy plan. The city council
[41:56]
in their role as a municipal governing
[41:58]
body not only has to weigh the
[42:00]
recommendations of the planning
[42:01]
commission but also determine the terms
[42:03]
and conditions upon which property is to
[42:06]
be annexed should that be the ultimate
[42:08]
decision that reduce or eliminate the
[42:10]
burden on the city's existing
[42:12]
infrastructure and services. These are
[42:14]
not simple decisions to ma to be made by
[42:17]
either body and should not be rushed. It
[42:19]
is anticipated and highly appropriate
[42:21]
that these decisions could be debated,
[42:24]
discussed at length, vetted thoroughly,
[42:27]
differing opinions expressed, and
[42:29]
decided without unanimous consent. Aside
[42:32]
from and in addition to the concerns for
[42:34]
infrastructure and services involved
[42:36]
with annexation, there are other
[42:38]
political, social, and financial
[42:40]
considerations that should be
[42:41]
considered. So I read that to the
[42:44]
council from our annexation policy so
[42:47]
that we are certain that we have
[42:49]
whatever the discussion is amongst the
[42:50]
council that we're certain that we have
[42:52]
gone through our annexation policy and
[42:54]
whatever the decision is that's made
[42:56]
tonight that it is made according to
[42:58]
that policy.
[43:01]
>> Is there any discussion amongst the
[43:03]
council?
[43:06]
I would just ask uh John and Jamie if
[43:10]
all of the the last time we voted on
[43:12]
this that was to vote to consider moving forward with the
[43:18]
annexation and there were several steps
[43:20]
that needed to be that needed to take
[43:22]
place and
[43:25]
Wes have all of those steps been
[43:28]
completed?
[43:29]
>> Yes.
[43:33]
» That's all I want.
[43:37]
So this is a public hearing. Does anyone
[43:41]
have any more questions for Wes or any
[43:42]
discussion before we open the public
[43:44]
hearing?
[43:48]
Okay. Thank you, Wes. We will open the
[43:52]
public hearing for this request for
[43:55]
annexation.
[44:01]
No one. All right. Seeing no one coming
[44:06]
up for the public hearing, we will close
[44:08]
the public hearing and I will look to
[44:11]
the council for a motion.
[44:15]
I'll make a motion to approve
[44:18]
ordinance 2026-063
[44:20]
annexing property into the city of St.
[44:23]
George and adjusting the corporate
[44:25]
boundary lines to include 2.277 acres
[44:29]
located at the intersection of 3430 east
[44:32]
in St. George and 3930 South in
[44:35]
Washington City.
[44:36]
>> I'll second.
[44:40]
» All in favor? Oh, sorry. I I mess this
[44:43]
up every time because I only do it about
[44:44]
once a year. Um, okay. Motion by
[44:47]
Natalie. Uh, seconded by Steve. All in
[44:50]
favor. Starting with Austin.
[44:52]
>> I.
[44:54]
>> Steve Kemp. I.
[44:55]
>> Natalie Larson. I
[44:56]
>> Danielle Lurkin. I. Michelle Tanner. I.
[45:00]
>> All right. Who's going to invite the
[45:02]
mayor back in
[45:20]
item number four is a public hearing in
[45:21]
consideration of ordinance number
[45:23]
2026-064
[45:25]
to vacate a portion of the Sage Haven
[45:28]
phase 15 subdivision plat identified
[45:31]
ified as a temporary turnaround easement
[45:33]
located at the west end of Samaria
[45:36]
Drive.
[45:38]
>> Okay. Right here before you, this is um
[45:41]
Sage Haven phase 15. What they did is
[45:45]
you can see right here, this length is
[45:48]
longer than 150 ft where that roadway
[45:50]
terminated. And so then what they're
[45:52]
required to do is provide a temporary
[45:54]
turnaround until such time as the road
[45:56]
extends. So they provided this temporary
[45:59]
turnaround right here. It was included
[46:01]
as part of the subdivision. So it's just
[46:04]
basically vacating that easement, the
[46:07]
temporary easement for the temporary
[46:09]
turnaround.
[46:10]
It's a lot of temporary
[46:12]
>> questions.
[46:18]
None. If no questions, come back to you.
[46:22]
This is a public hearing, so we'll go
[46:24]
ahead. There's no questions for Wes.
[46:26]
will go ahead and open the public
[46:28]
hearing for those who've come to speak
[46:29]
to this item.
[46:35]
» Seeing none, I'll close the public
[46:37]
hearing and come back to you, council.
[46:38]
Mayor, I'll make a motion that we
[46:40]
approve [snorts]
[46:42]
ordinance number 2026-6064
[46:46]
to vacate a portion of the Sage Haven
[46:48]
phase 15 subdivision plat identified as
[46:52]
a temporary turnaround easement located
[46:54]
at the west end of Samara Drive.
[46:56]
>> Second.
[46:57]
>> We have a motion by Austin, a second by
[46:59]
Danielle. This is an ordinance requiring
[47:01]
a roll call vote. Uh starting with uh
[47:04]
Shell
[47:05]
>> Michelle Tanner I. Danielle Larkin, I
[47:08]
>> Natalie Larson, I
[47:10]
>> Steve Kemp, I
[47:11]
>> Austin Anderson, I
[47:12]
>> Motion carries unanimously.
[47:14]
>> Item five, public hearing and
[47:16]
consideration of ordinance number
[47:17]
2026-065
[47:19]
vacating a portion of a municipal
[47:22]
utility easement located between lot 122
[47:25]
Cedar Crest at Devario phase 3 and lot
[47:29]
123 Ceda Crest at Dvario phase 3 partial
[47:33]
amendment A.
[47:34]
>> Okay. The owner of lots 122 and 123 of
[47:39]
Cita Crest phase three are proposing to
[47:42]
merge their lots. And as you all know,
[47:45]
there's a utility easement on both sides
[47:46]
of that side uh side property line. The
[47:49]
request is to vacate it so that they can
[47:51]
merge the two lots.
[47:55]
Questions for Wes?
[47:59]
Okay, this
[48:04]
Yep. This is also a public hearing. So I
[48:06]
will go ahead and open the public
[48:08]
hearing for those who have come to speak
[48:10]
to this item.
[48:17]
All right. Seeing no one, we'll close
[48:19]
the public hearing and come back to you,
[48:20]
council.
[48:24]
I will move to approve ordinance number
[48:26]
2026-065
[48:28]
vacating a portion of a municipal
[48:30]
utility easement located between lot 122
[48:35]
cea crest at Dvario phase 3 and lot 123
[48:40]
cece at Dvario phase 3 partial amendment
[48:43]
A.
[48:45]
>> I'll second.
[48:46]
>> So a motion by Michelle second by
[48:49]
Austin. This is an ordinance requiring a
[48:51]
roll call vote starting with Austin.
[48:54]
>> Austin Anderson I.
[48:55]
>> Steve Kemp I.
[48:56]
>> Natalie Larson. I
[48:57]
>> Danielle Larkin. I Michelle Tanner. I
[49:01]
>> Hold on one second. Bren
[49:04]
Wes. Was that your last item?
[49:06]
You're not going to try to take off on
[49:08]
us, are you?
[49:10]
Well, because I think today Well, what they were trying to do
[49:17]
is get me to bring a casket here to the
[49:19]
city hall.
[49:22]
>> Is Is the rumor true that you've turned
[49:24]
60 today?
[49:26]
>> It is. I'm very I'm very very sad right
[49:30]
now.
[49:30]
>> And you came to work?
[49:32]
>> I did because then I would just sit home
[49:34]
and drink or your face match
[49:35]
>> and I don't even drink.
[49:36]
>> Yeah. And if you know Wes, I'm sure
[49:38]
that's going to happen. Let let us
[49:40]
brighten up your day a little. Can you
[49:42]
guys all join me in singing happy
[49:44]
birthday to Wes and make it the best
[49:46]
happy birthday you've ever sang?
[49:48]
>> Like his face matches his shirt.
[49:50]
>> Yes. Here we go.
[49:51]
>> Sure it does.
[49:52]
>> Happy
[49:56]
[laughter]
[50:02]
dear Wes. [singing]
[50:09]
Thank you.
[50:13]
» I do have a little birthday gift for
[50:15]
you. I want to come. Is David still
[50:17]
here? Is David here? Take a picture.
[50:19]
>> Chad Chad, you can take a picture. We
[50:21]
got to take a picture with Wes up here
[50:23]
with the city council in the background
[50:25]
on his 60th birthday.
[50:28]
>> Yes, because my funeral's coming soon.
[50:30]
I've decided.
[50:33]
» So red. You're so bright.
[50:41]
» We get to do our purchase.
[50:52]
[laughter]
[51:07]
I remember when you turned 50, Wes.
[51:10]
[laughter]
[51:15]
» Well, congratulations, Wes. Thank you.
[51:17]
>> All right, Brenda. Sorry.
[51:21]
Item number six, consider approval of a
[51:23]
conditional use permit for a private
[51:25]
school serving students through grade 8
[51:28]
located in a designated landmark site in
[51:30]
a residential zone on approximately 0.21
[51:34]
acres located at 135 South 100 East.
[51:40]
» Okay, this is the location. The general
[51:44]
plan is downtown connected neighborhood
[51:47]
and the zoning is RCC residential
[51:50]
central city.
[51:54]
The Frederick Blake home was built in
[51:56]
the 1870s and was designated a local
[51:59]
landmark on August 19th in 2021.
[52:05]
So here's their proposal. They'll have
[52:08]
30 students with one teaching station.
[52:12]
The operating hours are Monday through
[52:14]
Thursday 9:00 am to 300 pm. Friday 12 am
[52:19]
9:00 am to 12 pm and the student drop
[52:22]
off times will be a half hour long time
[52:25]
each 8:45 a.m. to 9:15 a.m. and 2:45
[52:31]
p.m. to 3:15 p.m. That way they can
[52:34]
space out the time drop off and pickup
[52:36]
times for kids so there won't be traffic
[52:39]
jams in front of the home. And all the
[52:41]
outdoor activities will occur in the
[52:43]
rear yard fenced in area. So, their
[52:47]
proposal meets all the requirements that
[52:50]
are in the code. You may remember we
[52:52]
brought through the zoning regulation
[52:54]
amendment, and you all passed that on
[52:57]
May 7th of this year for this kind of
[52:59]
conditional use permit. This is the
[53:01]
first application for this kind of
[53:03]
conditional use permit.
[53:06]
Here's the site plan. And so the parking
[53:10]
requirement is 1.5 spaces per teaching
[53:15]
station and one space per 15 students.
[53:20]
So that would require four spaces. So
[53:22]
they're showing four spaces on this
[53:25]
plan. Here's the ADA space here and then
[53:28]
a space here and two spaces here. They
[53:31]
are allowed to
[53:33]
>> I'm sorry. Go ahead.
[53:34]
>> Okay.
[53:36]
They are allowed to count on street
[53:37]
parking for 50% of their parking
[53:40]
requirements.
[53:42]
And here's where they're going to hold
[53:44]
the outdoor activities back here in the
[53:46]
rear yard which is fenced.
[53:50]
This is the traffic plan that they are
[53:53]
required to provide. They indicated that
[53:55]
this will also be given to the parents
[53:58]
so that they will know what the plan is
[54:01]
for pickup and drop off. And here is
[54:04]
where they'll drop off the children in
[54:06]
front of the house. And then the parents
[54:08]
are supposed to turn and take 100 south
[54:11]
there. So there won't be a backup here.
[54:16]
The planning commission did recommend
[54:18]
approval
[54:19]
with these conditions and I can answer
[54:23]
any questions you might have. The
[54:24]
applicants are also here and they can
[54:26]
answer any questions you might have for
[54:28]
them.
[54:31]
Is the applicant good with the three
[54:34]
conditions that were given by the
[54:36]
planning commission?
[54:38]
>> They are.
[54:42]
» Okay. Any other questions for Brenda or
[54:44]
the applicant?
[54:46]
>> I'll make a motion.
[54:48]
>> Ready for it?
[54:48]
>> Okay. Yeah. I think this is exciting.
[54:50]
It's always nice to have alternative
[54:52]
school options and especially one right
[54:54]
in the neighborhood there. So, I will
[54:57]
move to approve a conditional use permit
[55:00]
for private school serving students
[55:03]
through grade 8 located in a designated
[55:05]
landmark site in a residential zone on
[55:08]
approximately 21 acres located at 135
[55:12]
South 100 East. I'll second that motion.
[55:16]
>> We have a motion by Michelle and a
[55:18]
second by Danielle.
[55:21]
Uh, this is a conditional use permit.
[55:24]
Roll call. Okay. So, all in, just to be
[55:29]
clear again, motion by Michelle, second
[55:31]
by Danielle to approve. All in favor say
[55:34]
I.
[55:35]
>> And I'll clarify that the motion does
[55:37]
include the uh three conditions from the
[55:40]
planning commission.
[55:42]
>> With the conditions from planning
[55:43]
commission. All in favor say I.
[55:45]
>> I.
[55:45]
>> Any opposed? Motion carries unanimously.
[55:48]
Thank you. Item number eight, consider
[55:50]
approval of ordinance number 2026-067
[55:54]
amending the Akenville interchange zone
[55:56]
plant development commercial zone on
[55:58]
approximately 3.4 acres generally
[56:00]
located east of Arrowhead Canyon Drive
[56:03]
and south of Havsu Drive.
[56:05]
>> Okay, this is for the Bucks Ace down in
[56:08]
the Center Commons area. Plan
[56:10]
development amendment located in between
[56:12]
Smith's and the Hampton Inn on Arrowhead
[56:15]
Canyon Drive
[56:17]
and current land use is plan development
[56:19]
as well as the zone plan being plan
[56:21]
development commercial. All part of the Atkinville interchange
[56:25]
zone plan
[56:27]
um con uh conceptual site plan um
[56:30]
appears to let me start over. The
[56:33]
building uh is approximately 45,600
[56:36]
square ft. uh it appears to meet all
[56:39]
setbacks. This is also the conceptual
[56:41]
landscape plan. Just know as well that
[56:43]
there is a 27 foot trail and utility
[56:46]
easement along that west side. And there
[56:48]
is also, as you probably saw on the
[56:50]
zoning map, that there is a residential
[56:52]
area just to the west. So, they will be
[56:54]
required to do the landscape buffer and
[56:57]
the sixoot masonry wall along that west
[57:00]
side. Um providing street trees along
[57:02]
Arrowhead Canyon Drive and street trees
[57:04]
along that private drive, Havsu Drive.
[57:07]
You'll also see that they show a little
[57:08]
monument sign there. Just as a reminder
[57:10]
for any of the signage is that it will
[57:12]
have to meet the Sun River Commons
[57:13]
master sign plan. So, just keep that in
[57:15]
mind as well.
[57:17]
Uh conceptual photometric plan appears
[57:20]
to meet uh meet code. We'll make sure
[57:21]
that we go through it thoroughly at the
[57:23]
site planner view. And here's the uh
[57:26]
rendering or the elevations. So,
[57:27]
elevations kind of depending on where
[57:29]
you look for height. Some of those
[57:30]
shorter sections are 26 feet. You've got
[57:33]
37 feet 2 in over here on that far east
[57:35]
side. And then that middle section which
[57:37]
is a little bit bigger though that
[57:38]
architectural feature is just over 39
[57:40]
ft. Um just also a note as well that the
[57:42]
majority of this building is single
[57:44]
level. There are just two little spaces
[57:46]
that have a have a second story. There's
[57:49]
a little office space right above the
[57:51]
main entrance and then there will also
[57:53]
be a a second level over here on the
[57:55]
west side close to that residential area
[57:57]
where it is a break room for the
[57:59]
employees. And I think there's also just
[58:00]
a little bit of office space as well. Uh
[58:02]
but the majority of this building
[58:04]
singlestory. Uh the windows that are
[58:06]
look like they could be a third third
[58:08]
story, they're just architectural
[58:09]
features. Just a pretty epic building.
[58:12]
Uh this is the view from the north. This
[58:14]
is your view from the east side if you
[58:16]
were on the Pioneer Road side. And you
[58:19]
can see some of the building materials
[58:21]
as well. So stuckle, woodlook, metal.
[58:23]
And you'll be able to see these better
[58:24]
on the on the renderings. Um but
[58:26]
composite panels and painted steel. And
[58:29]
then this is the side uh on the west
[58:31]
side along Arrowhead Canyon Drive. So
[58:33]
this is the side that would be facing
[58:34]
the residential zone and then also the rear portion of the building that
[58:37]
would be facing the Hampton Inn. Um we
[58:40]
will get to the very end where you'll
[58:41]
see the condition from the planning
[58:42]
commission, but one of the things that
[58:43]
we noted on there for the condition was
[58:45]
that any signage along the south side of
[58:48]
the building or on the west side that uh
[58:51]
that it not be lit just so that it
[58:52]
doesn't impact that residential zone to
[58:54]
the west.
[58:56]
uh some of your renderings, some of the
[58:58]
renderings from the north.
[59:00]
This is that main entrance and you can
[59:01]
kind of see a little bit of that office
[59:03]
area that will be on that second story.
[59:04]
It's really not very big at all.
[59:07]
Um from the northeast and the northwest.
[59:10]
Just a couple notes here. Again, just
[59:12]
that second story just where there'll be
[59:14]
a little bit of of an employee break
[59:15]
room. And then also just the the
[59:18]
renderings don't show the the masonry
[59:19]
wall continuing to the north. But it
[59:21]
will continue to the north too, probably
[59:23]
the sight triangle just to provide that
[59:25]
residential buffer.
[59:27]
And then this is the southeast side and
[59:30]
southwest side.
[59:32]
And the materials board. I did put the
[59:34]
materials board. It's a little bit
[59:35]
smaller so I put it behind council
[59:36]
member Kemp and council member Anderson
[59:38]
if you guys did want to take a look at
[59:39]
it.
[59:41]
Uh but again the composite metal, the
[59:43]
stucco, some of the painted steel for
[59:45]
the accents really.
[59:47]
And then let's just briefly talk about
[59:49]
the parking. So the parking with the
[59:50]
uses and the square footages, it's
[59:52]
required that they have 163 parking
[59:54]
spaces. This property by itself only has
[59:57]
112. And so what they have done is that
[59:59]
they have gone and done a shared parking
[1:00:02]
agreement with the Hampton into the
[1:00:04]
south. Um remember as part of our code
[1:00:06]
that they can do a shared parking
[1:00:08]
agreement with the property that's
[1:00:09]
adjacent to it um as long as they're um
[1:00:12]
hours are different and their peak uses
[1:00:15]
are different hours as well. Obviously
[1:00:17]
with a hotel and a retail hardware store
[1:00:19]
that you would think that the the uh
[1:00:22]
peak uses will be will be different.
[1:00:25]
Uh this just shows kind of in that
[1:00:27]
parking agreement where they've
[1:00:28]
determined where those 50 51 parking
[1:00:30]
spaces are going to be and they are
[1:00:31]
going to share them back and forth. Both
[1:00:33]
Hampton will be able to use some of
[1:00:34]
ACE's and the ACE will be able to use
[1:00:36]
the the 51 stalls on that uh west side
[1:00:38]
of the Hampton in as well. There are a
[1:00:41]
few few requests on this building
[1:00:42]
depending on where you measure the
[1:00:43]
height. We just wanted to make sure that
[1:00:45]
it was covered. Um, building height, you
[1:00:47]
could potentially measure it at 37 feet
[1:00:49]
2 in. Remember that the Atkinville
[1:00:51]
interchange zone plan allows building
[1:00:52]
heights up to 35 feet and architectural
[1:00:55]
height up to 45 ft. So, this one may be
[1:00:58]
just a touchover depending on how you
[1:00:59]
measure it. Uh, just remember that
[1:01:01]
there's also been other buildings
[1:01:02]
approved in this area. The Hampton in
[1:01:04]
right behind it is almost 68 feet. The
[1:01:06]
office building over by In and Out and
[1:01:09]
Del Taco is about 50 feet. And then
[1:01:11]
we've also seen the home to suites which
[1:01:12]
is a little bit further uh north on the
[1:01:14]
property or on the development but
[1:01:16]
they're just over 53 feet. So still well
[1:01:18]
below some of the buildings around it.
[1:01:21]
Another request is in the Atinville
[1:01:23]
interchange zone plan. It does say that
[1:01:24]
hardware stores are allowed but they're
[1:01:26]
only allowed if they're smaller than
[1:01:27]
40,000 square feet. Um with this
[1:01:30]
building, if you've been to the one in
[1:01:31]
Hurricane, you know that really the
[1:01:33]
hardware uses is not not everything that
[1:01:35]
they do, right? It's also a retail store
[1:01:37]
where they sell clothing and toys and
[1:01:39]
they have a little ice cream place. Um
[1:01:41]
some of the sporting goods. So really
[1:01:43]
this building by itself is uh only about
[1:01:45]
60% hardware and more about 40% uh
[1:01:48]
retail. So uh just over the the 40,000
[1:01:51]
square foot limit, but really only about
[1:01:54]
60% of it being that hardware use.
[1:01:57]
The final request is in regards to that
[1:01:59]
uh privacy wall that's for the
[1:02:01]
residential buffer. um the way that the
[1:02:03]
building has is sitting on the lot, they
[1:02:05]
really tried to maximize the width of
[1:02:06]
the lot. Um with that and where the the
[1:02:10]
masonry wall would have to go, it would
[1:02:12]
eventually run into the building,
[1:02:13]
terminate terminate into the building.
[1:02:15]
And what they are requesting is that um privacy wall instead of
[1:02:19]
continuing to the south property line
[1:02:21]
that it ends where it terminates with
[1:02:23]
the building. And really with that, you
[1:02:25]
can see anywhere where the block wall
[1:02:27]
would not be, it's just landscaping.
[1:02:29]
There are no windows, no doors on that
[1:02:31]
portion of the building. So really, this
[1:02:32]
would have no effect on the residential
[1:02:34]
um area to the west.
[1:02:38]
With that, planning commission had the
[1:02:39]
public hearing on July 28th. Recommended
[1:02:42]
approval with a 5 to zero vote just with
[1:02:43]
that one condition, just the no lit
[1:02:46]
signage along the south or the west
[1:02:48]
property lines just to protect those
[1:02:50]
residential zones and protect the hotel.
[1:02:52]
Um Jared Madson from Sky Engineering is
[1:02:54]
here if you have any questions and I can
[1:02:55]
answer that. You may have any that you
[1:02:57]
may have as well.
[1:03:00]
Thank you, Brian. Any questions for
[1:03:01]
Brian?
[1:03:02]
>> I don't have any questions, but it's
[1:03:04]
nice to have a non-controversial
[1:03:07]
item for this community that seems to be
[1:03:10]
highly favorable, actually. So,
[1:03:12]
>> you you probably saw in your packet, we
[1:03:13]
did receive one positive uh letter, too.
[1:03:15]
So, they're pretty excited, I think, to
[1:03:17]
have this down there.
[1:03:21]
Mayor, I'll make a motion that we
[1:03:23]
approve ordinance number 2026-067
[1:03:27]
amending the Akenville interchange zone
[1:03:30]
planned development commercial zone on
[1:03:32]
approximately 3.8 acres generally
[1:03:34]
located at Arrowhead Canyon Drive and
[1:03:36]
south of Hav Havsu Drive along with
[1:03:39]
planning commission's one
[1:03:41]
recommendation.
[1:03:41]
>> A second. So we have a motion by Austin,
[1:03:44]
a second by Steve. This is an ordinance
[1:03:46]
requiring roll call vote starting with
[1:03:48]
Danielle.
[1:03:49]
>> Uh, do we need to include the do we need
[1:03:52]
to say verbally that we're including the
[1:03:53]
Palani Commission's recommendations?
[1:03:55]
>> He he did.
[1:03:56]
>> Oh, you said it.
[1:03:57]
>> Yeah.
[1:03:57]
>> I just need to listen better.
[1:03:59]
>> I Michelle Tanner. I
[1:04:03]
>> Austin Anderson. I
[1:04:04]
>> Steve Kemp. I
[1:04:05]
>> Natalie Larson I.
[1:04:07]
>> Motion carries.
[1:04:10]
Item number nine is consider approval of
[1:04:11]
ordinance number 2026-068
[1:04:14]
amending title 10-17A
[1:04:17]
of the city code amending ADU
[1:04:19]
regulations on lots exceeding 31 11,000
[1:04:22]
square ft and clarifications on existing
[1:04:25]
detached structures and health and
[1:04:26]
safety codes.
[1:04:30]
» All right.
[1:04:32]
Thank you. Um earlier this year the
[1:04:35]
state passed um SB284
[1:04:39]
which um made some requirements of
[1:04:42]
cities to allow detached accessory
[1:04:46]
dwelling units on uh on lots that are
[1:04:51]
over 11,000 square feet. Um to be honest
[1:04:53]
we the city has uh St. York City has
[1:04:56]
been pretty progressive and um aware of
[1:05:00]
the need for ADUs and and have allowed
[1:05:02]
them for quite some time. So, this is
[1:05:04]
really just a a a tweak to allow uh
[1:05:09]
accessory dwelling units on um on lots
[1:05:12]
that are that exceed that uh 11,000
[1:05:14]
square foot threshold and um to bring it
[1:05:17]
in compliance with with the state code.
[1:05:20]
So, uh with that, this is the proposed
[1:05:23]
language. Um we are proposing that uh
[1:05:27]
1017A3D
[1:05:29]
uh be uh rewritten. Um that struck out
[1:05:33]
language is then reinserted in uh number two. So number one would be
[1:05:39]
one accessory dwelling unit shall be
[1:05:40]
permitted on any lot containing a single
[1:05:43]
family dwelling subject to the standards
[1:05:44]
of the section. And then number two, a
[1:05:46]
second accessory dwelling unit may be
[1:05:48]
permitted on and then uh lots or parcels
[1:05:51]
located within downtown boundaries.
[1:05:53]
That's that's consistent with what we
[1:05:55]
allow now. And then lots or parcels
[1:05:58]
containing at least 11,000 square feet
[1:06:00]
provided one ADU is attached to the
[1:06:03]
primary dwelling and one ADU is
[1:06:05]
detached. Um so again consistent with
[1:06:08]
the requirement from state code and then
[1:06:10]
a lot containing uh a lot shall contain
[1:06:14]
no more than uh two accessory dwelling
[1:06:16]
units. Um, the other thing that SB284
[1:06:20]
did was required that um
[1:06:24]
that existing structures that people
[1:06:27]
want to convert to an ADU uh be have
[1:06:30]
some sort of a path forward to allow
[1:06:32]
that. So, this section J uh states that
[1:06:36]
an ex an existing legally constructed
[1:06:38]
accessory structure may be converted to
[1:06:40]
a detached accessory dwelling unit
[1:06:42]
subject to meeting the requirements of
[1:06:44]
this section. So as long as they can
[1:06:46]
meet the other provisions of the ADU
[1:06:49]
that would be allowed. And then finally
[1:06:52]
um again another section uh from SB284.
[1:06:56]
Uh this is just compliance. Um again
[1:06:58]
health and safety codes. All accessory
[1:07:01]
dwelling units must comply with all
[1:07:02]
applicable building building health and
[1:07:04]
fire codes. Um so again that just came
[1:07:07]
straight from SB284.
[1:07:09]
So um so planning commission held a
[1:07:11]
public hearing. There was no comment
[1:07:13]
received on it, but they forwarded a
[1:07:15]
positive recommendation. Um,
[1:07:17]
unanimously,
[1:07:19]
uh, if you have any questions, I can try
[1:07:22]
to answer those for you.
[1:07:25]
>> I have a question. [clears throat] In
[1:07:27]
the first, uh, redline edit on page 231
[1:07:32]
where we struck only one accessory
[1:07:34]
dwelling unit or guest house should be
[1:07:36]
allowed on a lot or parcel. Then within
[1:07:39]
the downtown boundary, two ADUs are
[1:07:41]
allowed per lot.
[1:07:43]
If we had left that language the way it
[1:07:46]
is, would two detached units be allowed?
[1:07:52]
I'm asking staff or legal or somebody
[1:07:59]
because it seems like at one point we
[1:08:02]
had discussed this that having that
[1:08:04]
second ADU on on lots where it was
[1:08:07]
possible and I know one of the ones we
[1:08:09]
looked at they were actually two
[1:08:10]
detached units. This will restrict it
[1:08:13]
now to have to have one attached to and
[1:08:16]
then the second one could be detached.
[1:08:19]
>> Correct.
[1:08:21]
If you look at the way it's worded,
[1:08:23]
number 2A, a second accessory dwelling
[1:08:25]
unit may be permitted on then it says a
[1:08:27]
lots or parcels located within the
[1:08:29]
downtown boundary. So I don't I the
[1:08:31]
intent was to take that language and
[1:08:34]
allow it and apply it this the way that
[1:08:37]
we're applying it now. I I don't think
[1:08:39]
that and Jamie you might want to jump in
[1:08:42]
but
[1:08:42]
>> yeah the discussion um council member
[1:08:45]
Kim was you know in the downtown area
[1:08:48]
within that downtown boundary that was a
[1:08:49]
discussion and this this sort of
[1:08:52]
acknowledges that um
[1:08:54]
>> this specific
[1:08:55]
>> the code right now that we have right
[1:08:57]
now adopted you can have two attached
[1:08:59]
two detach one attached one detached
[1:09:02]
downtown. This one is just changing it
[1:09:04]
in that now if you have 11,000 square
[1:09:07]
foot lot anywhere in the city, you can
[1:09:10]
have one attached, one detached.
[1:09:11]
Correct.
[1:09:12]
>> It does. It does not limit the ability
[1:09:14]
because we we looked at a specific
[1:09:16]
example of a very long narrow lot where
[1:09:19]
the home builder had built a home and
[1:09:21]
then had one detached and then had a
[1:09:22]
bunch of dead space behind his home and
[1:09:25]
was was looking at possibility of a
[1:09:27]
second detached unit where he had
[1:09:29]
parking, he had all the other things we
[1:09:31]
needed. Would this pre would this
[1:09:33]
preclude him from doing that?
[1:09:35]
>> Was it downtown?
[1:09:36]
>> Yes.
[1:09:38]
>> No.
[1:09:38]
So then that's say that was the
[1:09:40]
downtown discussion and that that still
[1:09:42]
applies. What Carol is saying is that
[1:09:45]
this now allows one of each anywhere in
[1:09:49]
the city, not just downtown. If you have
[1:09:51]
an 11,000 foot lot.
[1:09:53]
>> But by striking that last sentence, does
[1:09:56]
it have we told people they cannot have
[1:09:59]
two detached? Are we inferring that they
[1:10:01]
can't have two detached units downtown?
[1:10:04]
>> No.
[1:10:04]
we're not. The downtown
[1:10:07]
>> scratched out, but then it's added back
[1:10:08]
in.
[1:10:09]
>> It was added back in lower.
[1:10:11]
>> It's just combined with the 11,000
[1:10:14]
square foot lot.
[1:10:16]
>> But that sentence specifically says you
[1:10:18]
have to have one attached and one
[1:10:20]
detached.
[1:10:23]
» The next
[1:10:24]
>> There's two parts.
[1:10:26]
>> The first part talks about town
[1:10:28]
downtown.
[1:10:30]
And then the second part talks about
[1:10:32]
right 11,000 square foot lots.
[1:10:38]
» No, we intentionally preserved what we
[1:10:40]
did in the downtown area. We
[1:10:41]
intentionally preserved that, but this
[1:10:43]
broadens it.
[1:10:44]
>> It does not It does not say downtown can
[1:10:46]
have two.
[1:10:47]
>> Okay. So, you're talking about uh
[1:10:49]
>> D
[1:10:51]
2A that sentence.
[1:10:54]
>> Yeah. It doesn't say
[1:10:55]
>> preserves that ability for two detached
[1:10:57]
in the downtown area. Okay. Thank you.
[1:10:59]
>> Any way you want to do it.
[1:11:11]
» I'm ready to make a motion. Mayor,
[1:11:12]
>> I'm ready. Mayor, I'd like to make a
[1:11:15]
motion that we approve item number nine
[1:11:16]
cons uh ordinance number 2026-068
[1:11:22]
amending title 10-17A
[1:11:24]
of the city code amending ADU accessory
[1:11:27]
dwelling unit regulations on lots
[1:11:29]
exceeding 11,000 square ft uh and adding
[1:11:32]
clarifications on existing detached
[1:11:35]
structures and health and safety codes.
[1:11:38]
>> Second.
[1:11:39]
>> We have a motion by Steve uh second by
[1:11:42]
Michelle. This is an ordinance requiring
[1:11:44]
roll call vote starting with Natalie
[1:11:47]
>> Natalie Larson I.
[1:11:50]
>> Steve Kemp I.
[1:11:51]
>> Austin Anderson I.
[1:11:52]
>> Michelle Tanner. I Danielle Larkin I.
[1:11:55]
>> Motion carries.
[1:11:58]
That it. Okay. So now we need a motion
[1:12:01]
to
[1:12:05]
Yes. Let's do that. Do we have any
[1:12:07]
appointments? Nope.
[1:12:10]
Then we need uh uh reports from council
[1:12:13]
members.
[1:12:14]
Uh starting with you, Michelle.
[1:12:17]
>> No reports.
[1:12:21]
» Uh mayor, Friday, August 28th is the art
[1:12:25]
summit. So every year our art commission
[1:12:28]
holds what's called the art summit. So
[1:12:29]
if there are any arts organizations that
[1:12:32]
have received wrap tax, they're required
[1:12:34]
to come to the art summit. And if there
[1:12:37]
are arts organizations that would like
[1:12:38]
to receive the wrap tax, um, they should
[1:12:42]
come to the art summit. So, it's
[1:12:43]
something you can register for on our
[1:12:44]
website and it is happening on the 28th.
[1:12:49]
>> Very cool. Natalie, anything?
[1:12:53]
>> Dixie Days is coming your way. Social
[1:12:56]
media has a lot of posts on it. There's
[1:12:58]
a lot of great activities, a little bit
[1:13:00]
for everybody. We had our last meeting
[1:13:04]
today on it. and I just think it will be
[1:13:06]
a fantastic event for our community. But
[1:13:11]
we also have the September 11th by our
[1:13:13]
fire department memorial coming up. And
[1:13:17]
if you haven't been to the field of
[1:13:18]
flags before, you should bring your
[1:13:21]
children and your grandparents
[1:13:24]
and get there early in the morning and
[1:13:26]
sit there and look at those flags and
[1:13:29]
remember that there's an individual who
[1:13:31]
lost their life. And if you haven't done
[1:13:34]
that, come in the evening or come
[1:13:36]
whenever you can. I've been there when
[1:13:38]
the fire department has worked with the
[1:13:40]
Legacy Elementary School and other
[1:13:41]
elementary schools and brought those
[1:13:43]
kids to that event and
[1:13:47]
mo some of their parents weren't
[1:13:48]
probably even born at that point. But
[1:13:49]
it's very, very thoughtful, memorable
[1:13:52]
moment. And then they're having the
[1:13:53]
stair climb also at Tech Ridge and
[1:13:57]
people should sign up to take that
[1:13:59]
challenge. So look on the website and
[1:14:01]
get get signed up for that.
[1:14:04]
I have no reports.
[1:14:06]
>> Mayor, I serve on the Southwest Mosquito
[1:14:08]
Abayment Board, one of my favorite
[1:14:10]
boards. Uh, but at the last meeting, we
[1:14:14]
did talk about there was there's been
[1:14:16]
several positive cases of West Nile in
[1:14:19]
the mosquitoes here with all the rain
[1:14:21]
we've had, we've had the mosquitoes that
[1:14:23]
came out. Uh, they're working to get
[1:14:25]
that down. But one thing also I want to
[1:14:27]
mention they if you a resident's
[1:14:29]
probably I didn't know this but if you
[1:14:31]
do see mosquitoes around your area have
[1:14:33]
a problem you can call mosquito
[1:14:35]
abatement and they'll send people right
[1:14:36]
out and they're very passionate do a
[1:14:38]
great job so encourage them to take
[1:14:41]
advantage of that
[1:14:43]
>> standing water's the enemy right
[1:14:45]
>> yeah and keep you know inoculate your
[1:14:47]
horses you don't want less now on the
[1:14:49]
horses but
[1:14:51]
>> I didn't know either I was like how did
[1:14:52]
we get it and I guess we get it from
[1:14:54]
birds
[1:14:56]
mosquitoes bite the birds and the birds
[1:14:57]
fly from here to Salt Lake or wherever
[1:14:59]
and that's how the West Nile gets
[1:15:01]
spread. So,
[1:15:03]
>> it's interesting.
[1:15:04]
>> Very, very cool. All right. Anything
[1:15:06]
else? Okay. Now, we need a motion. We do
[1:15:10]
need to reconvene in our work meeting.
[1:15:12]
So, I need a motion to adjourn city
[1:15:14]
council and reconvene in work meeting.
[1:15:17]
Mayor, I'd like to make a motion that we
[1:15:19]
adjourn the city council meeting and
[1:15:21]
reconvene in our work meeting in the
[1:15:23]
city council boardroom.
[1:15:25]
>> Second.
[1:15:25]
>> We have a motion by Steve, second by
[1:15:27]
Michelle. All in favor say I.
[1:15:29]
>> I.
[1:15:31]
>> It's non-debatable.
[1:15:45]
Lonnie, do planners wear ties in
[1:15:47]
Wyoming?
[1:15:49]
They do.