Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:09]
Good morning. We'll get underway. We're moving a
[0:14]
few people around. But we'll get started in
[0:16]
the meantime. My name is Mark Scheipmeyer. I
[0:20]
am the county's hearing examiner. I've been asked
[0:22]
to convene a public hearing to consider testimony
[0:26]
as part of a fact finding to determine
[0:28]
whether certain permits should be approved for a
[0:32]
project that is known as the Wandering River
[0:34]
Retreat Center bearing the county's shoreline number 20
[0:39]
Four-ten 40 and campground site binding site plan
[0:44]
number 2435.01. The property located at 4311 Kalama
[0:51]
River Road owned by Jeremy Irish. Purpose of
[0:57]
today's hearing is to consider whether three permits
[1:00]
should be approved. The first is referred to
[1:03]
as a shoreline substantial development permit. The second,
[1:07]
which I'll need to perhaps better understand is
[1:10]
a shoreline conditional use permit. And the third
[1:14]
is a campground binding site plan approval. All
[1:18]
three of those come before the hearing examiner
[1:21]
for decision. This is a public hearing for
[1:25]
the purpose of considering those requests. Many of
[1:31]
you have probably been in public hearings of
[1:34]
one kind or another, but I doubt that
[1:36]
many of you have been in front of
[1:39]
this type of hearing. And so it's important
[1:43]
that we go over the process and the
[1:46]
rules and what's taking place so that we
[1:49]
all have a common understanding of what to
[1:52]
anticipate today. And I should note that this
[1:55]
is taking place in a room that I
[1:57]
have never been in before. I've been the
[2:00]
county's hearing examiner for about twenty years, but
[2:03]
this is the first time I've sat in
[2:05]
this room. And so it's a little disconcerting,
[2:10]
lighting, the location, everything else is just a
[2:13]
bit different. So I'm getting used to it
[2:15]
and lots of screens three inches from my
[2:18]
face. And so I will adapt as quickly
[2:21]
and as fully as I'm capable of doing
[2:24]
so, so that the hearing goes well. And
[2:30]
it may cause me a little confusion from
[2:32]
time to time. So if I stop and
[2:33]
seem to be flustered a little bit, it's
[2:37]
getting used to my surroundings. So about the
[2:41]
hearing. The hearing has three components. It's to
[2:44]
hear first from county staff. I believe that
[2:47]
would be Mr. Kreitzer and perhaps other members
[2:50]
of county staff. The record should reflect that
[2:52]
a number of county staff are present today.
[2:56]
Once the county has made its presentation, then
[2:59]
the applicant is allowed the opportunity to add
[3:02]
or subtract to what the county has recommended.
[3:05]
And those two parts of the hearing take
[3:07]
place first for the benefit of the public
[3:10]
so that the public gets a better picture
[3:13]
of the entire application before it's asked to
[3:17]
comment on it. Again, that's why the public
[3:20]
goes third. So the third piece, the third
[3:23]
leg of the stool is the public comment
[3:26]
that takes place after the staff comment and
[3:30]
then the applicant's comments. And so I wanna
[3:33]
spend just a couple of minutes talking about
[3:35]
that piece, because that's the most important piece
[3:38]
of today's hearing. First of all, I think
[3:42]
there's a signup sheet likely going around. I
[3:45]
appreciate that. That signup sheet is not binding.
[3:49]
If you signed it and then change your
[3:51]
mind, you're not obligated to still speak. If
[3:54]
you didn't sign it, but have decided that
[3:56]
you would like to speak, well, you're gonna
[3:58]
be given that opportunity. And so before it's
[4:02]
done, I'll make certain that anybody who might
[4:04]
have wanted the opportunity to speak has been
[4:07]
given that opportunity. Secondly, I'm going to restrict
[4:11]
public testimony to five minutes per person. Some
[4:15]
may feel like that's a tight restriction. It
[4:18]
is not. Five minutes is a long time
[4:21]
to talk. And so not many people will
[4:24]
likely need more than five minutes of testimony.
[4:28]
Now, if you do, if you're a member
[4:30]
of the public and you think that your
[4:32]
testimony would be longer than five minutes, well
[4:35]
then I'll simply ask a courtesy from you.
[4:37]
And that is that you defer your testimony
[4:40]
to the end of the line. And that's
[4:42]
simply as a courtesy to all the other
[4:44]
people who have come to testify so that
[4:47]
you're not holding them up and making them
[4:49]
stay longer just because you're long winded. And
[4:52]
so if you think your presentation has many
[4:56]
points to which that will take longer, we'll
[4:59]
then simply go to the end of the
[5:01]
line and ask me at that point, if
[5:03]
you have my permission to go beyond five
[5:05]
minutes and undoubtedly I'll give you that permission.
[5:10]
Here's where I start offending people in some
[5:12]
of my comments. So this is not a
[5:17]
political process. This is a legal process that
[5:21]
we're going through today. So what does that
[5:23]
mean? It means I'm not interested in public
[5:26]
opinion. I'm not interested in what your opinions
[5:29]
are. I'm not interested in the number of
[5:32]
people who are for a project as opposed
[5:34]
to the number of people who are opposed
[5:36]
to the project. I'm not interested in petitions.
[5:39]
I'm not interested in anything that's intended to
[5:42]
demonstrate a common belief about a project. That
[5:46]
as a matter of law is not what
[5:48]
I'm allowed to consider as part of this
[5:50]
type of hearing. I, again, often irritate, annoy,
[5:55]
offend people when I remind them of those
[5:57]
facts, but it's important that you understand what
[6:01]
I am obligated to consider and what I
[6:03]
am not allowed to consider as part of
[6:06]
a fact finding decision. So this is effectively
[6:09]
a court of law. I am deciding based
[6:11]
upon the findings that I make as to
[6:14]
the project for or against, and therefore what
[6:18]
my final decision will be based upon those
[6:21]
factual findings. Not upon any public opinion, not
[6:25]
upon popularity of a project, but based upon
[6:28]
the factual findings that I reach. So that
[6:32]
gets us to your testimony. If you're wanting
[6:35]
to testify today, and I hope all of
[6:37]
you want to testify, the more the better,
[6:44]
what I'll remind you is of that standard.
[6:47]
So first of all, if you need to
[6:49]
refer to me, you can either refer to
[6:51]
me as Mr. Scheife Meyer, or you can
[6:54]
refer to me as Mr. Hearing Examiner, your
[6:56]
preference. And so if you want me to
[7:00]
ask a question or you want to speak
[7:02]
to me, you might say, Mr. Scheife Meyer,
[7:06]
I am opposed to this project. But if
[7:09]
all you say is that, or you say,
[7:12]
I'm opposed to it and so are my
[7:14]
neighbors, With all due respect, you haven't moved
[7:17]
the ball down the field. That opinion is
[7:20]
not beneficial to me in that final decision
[7:23]
making I'm required to make. So instead, if
[7:28]
you might testify as follows, Mr. Hearing Examiner,
[7:31]
I oppose this project for the following four
[7:34]
reasons. It's those four reasons that I'm interested,
[7:38]
not on the fact that you're opposed, but
[7:40]
on the four reasons why you are opposed.
[7:43]
And that is what I will then consider
[7:46]
in rendering my final set of findings of
[7:49]
fact, which then drive my legal conclusions and
[7:53]
my ultimate decision. So if you wanna testify,
[7:57]
no opinions, give me facts. That's what I'm
[8:00]
interested in considering when rendering my final decision.
[8:06]
And lastly, there will be no public response
[8:11]
to anyone's testimony. There's gonna be no clapping.
[8:15]
There's gonna be no expressions of support or
[8:18]
hostility. There's gonna be no demonstration of any
[8:22]
kind following anyone's testimony. That's the quickest exit
[8:27]
to this room is saying or doing anything
[8:30]
after anyone has testified. This is a courtroom
[8:33]
and you treat it like a courtroom. You
[8:35]
don't clap in a courtroom. You don't hoot
[8:38]
and holler or show support. You respect the
[8:41]
system. You treat everyone civilly. You recognize that
[8:47]
this is a very formal legal process. Anyone
[8:50]
who wants to disagree with that will simply
[8:52]
need to be in another room doing something
[8:55]
else. Everyone who does testify today, county staff,
[9:00]
including the applicant and including all members of
[9:02]
the public will do so under oath. There
[9:05]
will be first sworn and we are maintaining
[9:08]
a verbatim recording of this hearing because anyone
[9:11]
who feels aggrieved by my decision has the
[9:14]
right to appeal that decision, whichever of the
[9:17]
three parties it may be, that appeal would
[9:20]
be to the Cowlitz County Superior Court. In
[9:23]
that instance, the court would not conduct a
[9:25]
new hearing. It would listen to this hearing
[9:28]
and decide whether my decision was appropriately made.
[9:32]
So since it's only listening to this hearing,
[9:35]
it's incumbent on me to make sure that
[9:36]
this hearing is fully capturing all of the
[9:40]
testimony that is being received so that should
[9:43]
it be appealed, the court has a full
[9:45]
and complete copy of the proceedings. And for
[9:50]
that reason, it's important that your testimony be
[9:53]
captured at places where it can be memorialized.
[9:57]
So if you wish to speak, sorry, but
[9:59]
you will need to come to a microphone,
[10:01]
not so much to amplify your testimony, but
[10:05]
to memorialize that testimony for that record. So
[10:10]
again, new room, don't know how we're operating
[10:12]
here, but staff can provide us more information
[10:16]
as to how everyone will be speaking to
[10:19]
a location in which their testimony can be
[10:22]
captured. I think those are all of my
[10:28]
public comments. So let us get us underway
[10:31]
with testimony. So that would begin again with
[10:36]
county staff and before doing so, should recognize
[10:42]
that in advance of today's hearing, I've received
[10:43]
the staff report, which is authored by Mr.
[10:45]
Kreitzer. That staff report comes with about 200
[10:50]
pages of other material. I have read every
[10:53]
page of that 200 pages and a large
[10:56]
part of that is public comment. If you
[10:58]
submitted a public comment, I have read it
[11:00]
in advance of today's hearing. And I have
[11:03]
read all of the reports scientific and otherwise
[11:06]
in advance of today's hearing. I'm fully knowledgeable
[11:10]
about all materials that have been given to
[11:12]
the county prior to today's hearing. I'll determine
[11:16]
evidencing numbers for exhibits based upon all that.
[11:21]
I'll have to give that a little bit
[11:23]
of thought as to how I identify those
[11:26]
as exhibits because of how they've come in.
[11:29]
So in the event there are additional exhibits
[11:32]
presented today, I'll simply begin with exhibit 100.
[11:36]
That way I've given myself plenty of latitude
[11:39]
for identifying all the exhibits that have been
[11:42]
submitted in advance of today's hearing. So if
[11:44]
you have something that you want to submit
[11:48]
as an exhibit, you'll need to ask me
[11:50]
if you can, and I'll need to approve
[11:53]
it. And you will need to receive it
[11:56]
in a copy that would be beneficial if
[11:59]
you would have made available to others, but
[12:02]
understand where that oftentimes proves to be difficult
[12:05]
on the day of the hearing. If you're
[12:09]
testifying and you're doing so off of a
[12:13]
written sheet of paper that you've come ready,
[12:16]
you've taken your notes and you've written them
[12:18]
down and you've written out your narrative, It's
[12:20]
often useful if you'll then submit your written
[12:24]
statement as an exhibit for the simple reason
[12:27]
that all of us, me included, if we're
[12:31]
reading off a sheet of paper, we speak
[12:34]
faster. We pick up our pace. We speak
[12:39]
faster than we would if we were simply
[12:41]
talking. And so what happens is when you're
[12:44]
reading from that sheet of paper, I am
[12:46]
working hard to stay up with you, but
[12:49]
it gets hard because you're talking so fast,
[12:53]
making your point so quickly that it's difficult
[12:55]
for me to track sometimes what it is
[12:58]
that you're trying to say. So in that
[13:00]
instance, it's useful if you'll then also give
[13:03]
me your written speech so that I can
[13:06]
take a moment later and look at it
[13:08]
in a more measured pace where I can
[13:11]
better understand some of the points that you
[13:12]
may have gone through very quickly in your
[13:15]
oral presentation. So again, if you've made a
[13:19]
speech in advance, many people do, and that's
[13:22]
a great idea. It is useful if you'll
[13:24]
then surrender the speech as an exhibit so
[13:27]
that I can use it to better understand
[13:29]
some of the points that you were making.
[13:31]
All right, I think I've exhausted all the
[13:34]
points I wanna make in advance of testimony.
[13:37]
Let's get us underway. That begins with the
[13:39]
presentation by county staff. That would be Mr.
[13:41]
Kreitzer. Mr. Kreitzer, let's have you sworn, do
[13:44]
you swear or affirm to tell the truth,
[13:45]
the whole truth and nothing but the truth?
[13:47]
I do. Go ahead. Thank you. So the
[13:52]
case we're hearing today is regarding a level
[13:53]
two shoreline substantial development permit with a conditional
[13:56]
use element and a campground binding site plan.
[14:06]
Olma Design and Jeremy Irish prepared an application
[14:08]
for the proposed construction of a camping retreat
[14:10]
and event center with related site improvements. The
[14:14]
site is currently zoned as unzoned and has
[14:16]
a comprehensive plan designation of rural. Rural areas
[14:19]
are characterized by low density residential uses that
[14:22]
are compatible with natural land practices in addition
[14:25]
to small scale commercial and industrial uses, tourism
[14:28]
opportunities, community facilities, along with timber management and
[14:32]
agriculture. And per Cowlitz County Code 18.10x, excuse
[14:38]
me, 0.275A, all uses which have not been
[14:41]
declared a nuisance by statute resolution ordinance or
[14:43]
court of competent jurisdiction are permitted within the
[14:46]
unzoned district. However, because the application includes a
[14:51]
campground element, it is elevated to a special
[14:53]
use permit. Okay, go ahead. Sorry. The shoreline
[15:01]
along the subject parcel has a shoreline environment
[15:03]
designation of rural conservancy and the proposed retreat
[15:06]
and events center would be considered a recreational
[15:09]
use thus requiring a level two shoreline substantial
[15:11]
development permit per the shoreline master program table
[15:15]
eight-one. There is a floodplain present on the
[15:18]
parcel and per the SMP, the shoreline jurisdiction
[15:22]
extends 200 feet horizontally from the edge of
[15:26]
the floodway. And this places a portion of
[15:29]
the proposed parking within the shoreline jurisdiction, which
[15:33]
is where the conditional use element. And let's
[15:35]
stop there for a minute, Mr. Kreitzer. That's
[15:37]
where I get tangled up. The applicant's conditional
[15:39]
use permit, or sorry, critical areas report opines
[15:43]
that a conditional use is not present or
[15:46]
is not needed because the parking is existing
[15:49]
parking, not new parking. Does the county then
[15:56]
disagree as to that aspect and believe that
[15:58]
existing parking requires conditional use permit? No, the
[16:01]
existing parking does not require a conditional use
[16:03]
permit, just the new proposed parking. I thought
[16:08]
I read in their critical areas report that
[16:10]
they were revising the parking to take any
[16:12]
new parking out of shoreline jurisdiction that I'm
[16:16]
well, I'll come to them in a minute,
[16:18]
but is that not your understanding then? I
[16:21]
believe they've revised to remove any encroachment within
[16:26]
the traditional 200 foot shoreline jurisdiction and outside
[16:28]
of the critical areas associated with the shoreline,
[16:31]
but they had to place some parking landward
[16:34]
of the ordinary high watermark and close to
[16:36]
the current development, but it's still due to
[16:38]
the floodway would be considered. So there is
[16:41]
new parking proposed within shoreline jurisdiction, but not
[16:45]
within traditional shoreline, but extended shoreline. Correct. Okay,
[16:49]
alright. So the public hearing objective is to
[16:55]
review the level two SSDP with the conditional
[16:57]
use permit, and this is pursuant to Chapter
[17:00]
90.58 of the RCW section 8.7 of the
[17:04]
SMP and Cowlitz County code 18.56.055. So the
[17:14]
applicant proposes 37 campsites on 12.76 acres of
[17:19]
land. They've proposed 10 hype domes, nine drop
[17:24]
structures, and both of those are prefabricated structures.
[17:27]
And I've included some image examples in the
[17:30]
presentation. They also proposed four camping pods which
[17:34]
will include three tents each in addition to
[17:37]
four individual tent camping sites and two recreational
[17:40]
vehicle sites. There's some density calculations that go
[17:44]
into proposed campgrounds and the density is 15
[17:47]
camping spaces per gross acre. And so there
[17:50]
are 37 proposed sites is well below the
[17:52]
maximum of 191.4 camping sites that the site
[17:55]
could support. The project also proposes to utilize
[18:00]
and remodel some existing structures. They proposed to
[18:02]
remodel one existing structure into a caretaker residence
[18:06]
and another of the existing structures into an
[18:08]
event center. They're also proposing some pertinent project
[18:12]
development, including a road, parking, walkway, landscaping, and
[18:16]
utility improvements associated with campground operation. These are
[18:21]
examples of hype domes. They're small prefabricated domes
[18:26]
that are used for camping or for recreational
[18:29]
uses. And these are examples of drop structures.
[18:34]
I believe that they are essentially prefabricated tiny
[18:37]
homes or very small cabins. The property is
[18:43]
bordered by it to the North by the
[18:46]
Clam River Road. And the majority of the
[18:48]
properties to the North are designated forest land
[18:50]
with some undeveloped land, not in the DFL
[18:53]
classification. Single family residences exist beyond the undeveloped
[18:57]
land and designated forest land that borders it.
[19:00]
The land is bordered to the South directly
[19:02]
by the Clamber River and then beyond the
[19:04]
river is designated forest land that's owned by
[19:06]
Weyerhaeuser. Your house, John's House. The land to
[19:14]
the east is a cabin with a single
[19:16]
family residence tax classification. I believe this structure
[19:19]
is not permitted. And then beyond that is
[19:22]
designated forest land. To the West adjacent is
[19:26]
also land that's owned by the applicant Mr.
[19:28]
Irish that will remain undeveloped in the current
[19:30]
proposal and any changes to that would require
[19:32]
residents and residential uses. Let's go back to
[19:42]
the east. So the cabin when you say
[19:45]
it's not permitted, could you, is it, does
[19:50]
it predate? It predates the existence of building
[19:53]
and planning. Okay, so instead of saying non
[19:56]
permitted, might describe it as legally non conforming?
[19:59]
Yes. I've included some aerial photos of the
[20:07]
project site so you can see some of
[20:10]
the current impervious surfaces in addition to some
[20:12]
of the existing structures that are proposed to
[20:14]
be utilized and the location to the Clamber
[20:17]
River. This is just another photo from a
[20:24]
different angle. Amazing. And here is a large
[20:37]
scale view of the proposed development. The property
[20:40]
that Mr. Irish owns to the West of
[20:43]
the proposed campground will be serving to access
[20:47]
through his private road or private driveway. Here
[20:53]
is a closer, still hard to see. I
[20:57]
believe I have a better photo here of
[20:59]
the layout of the proposed campground, including the
[21:02]
existing buildings, any new proposed impervious surfaces or
[21:05]
new proposed development, the location of the hype
[21:10]
domes, the location of the drop structures in
[21:12]
addition to all of the tent camping spaces.
[21:22]
And this photo is from the critical areas
[21:25]
report that also shows all of the proposed
[21:28]
structures in addition to the different critical areas
[21:30]
that exist on-site. And so this light blue
[21:34]
portion here, I don't know, just north of
[21:39]
some of the camping spots, of the Klamath
[21:41]
River, That is the encroachment of the drain
[21:45]
field and of the proposed parking locations that
[21:48]
are within the extended shoreline jurisdiction that is
[21:50]
extended due to the presence of floodplain or
[21:53]
floodway. Here are some photos to show postings
[22:02]
of the subject property in addition to postings
[22:05]
within the daily news that indicated the application
[22:09]
in addition to the public hearing time and
[22:11]
date. Per the comprehensive plan, rural areas are
[22:17]
intended to provide for independent and private rural
[22:20]
living without significant encroachment on lands used for
[22:22]
commercial timber or AG production. Rural areas are
[22:25]
characterized by low density residential uses compatible with
[22:29]
natural land potential, small scale commercial and industrial
[22:31]
uses, and tourism opportunities as I identified earlier.
[22:35]
Goal land use 10 is to preserve rural
[22:38]
character while respecting the interests of property owners.
[22:43]
And 10.1 is to support and encourage uses
[22:45]
within rural areas to sustain and are compatible
[22:48]
with rural character and the current level of
[22:50]
public services and facilities. Land Use Goal 10.2
[22:54]
encourages and supports economic development projects in rural
[22:57]
areas, particularly those which focus on natural environment
[23:00]
and economic resource lands. A relatively small scale
[23:04]
recreation and retreat center meets the rural land
[23:06]
use goals identified within the County's comprehensive plan,
[23:10]
which identifies the small scale commercial use and
[23:12]
tourism opportunities. Per the submitted critical areas ordinance,
[23:17]
the proposed retreat, me, critical areas assessment, the
[23:21]
proposed retreat and event center should not negatively
[23:23]
impact any of the critical areas on-site through
[23:26]
mitigation purposes. Additionally, the submitted traffic impact analysis
[23:32]
indicates that the impacted portion of Calambora Road
[23:35]
and Greenwood Road is a statistically safe corridor
[23:38]
of travel with adequate site distances and that
[23:41]
the proposed access point will be safe and
[23:43]
efficient for operation of the proposed development. Per
[23:50]
Cowlitz County code eighteen point five six point
[23:52]
one zero zero, the minimum size acreage for
[23:55]
a campground is one half acre. The proposed
[23:57]
development is on 12.76 acres of land thus
[23:59]
meeting this requirement. Additionally, communal areas should be
[24:04]
located to limit noise trespass, natural and landscape
[24:07]
vegetation shall be maintained along existing property lines
[24:09]
and within exterior setbacks to the maximum extent
[24:12]
possible. So the applicant has proposed to place
[24:15]
all communal areas removed from property boundaries and
[24:20]
located to reduce all potential noise trespass onto
[24:22]
neighboring parcels within reasonable expectations. The applicant has
[24:28]
also proposed to maintain natural and landscape vegetation
[24:31]
along exterior property lines and setbacks to meet
[24:34]
screening requirements. So lighting shall be provided at
[24:38]
internal intersections and outdoor communal areas, and a
[24:42]
condition of approval would be that all lighting
[24:44]
shall be shielded and angled downward to limit
[24:47]
potential light trespass to adjacent properties. And some
[24:52]
of our findings regarding shoreline management and shoreline
[24:55]
master program compliance. Because the proposed recreational development
[25:00]
use is within a rural conservancy, shoreline environment
[25:03]
designation, it does require the level two shoreline
[25:06]
and the presence of a transportation use, which
[25:09]
is the new proposed parking, it requires the
[25:12]
conditional use permit as well. And while the
[25:15]
proposed development is to be outside of the
[25:17]
combined 160 foot shoreline buffer and the building
[25:22]
setback, the shoreline jurisdiction extends beyond the traditional
[25:25]
200 feet, due to the presence of the
[25:28]
floodway. And per the submitted critical areas assessment,
[25:32]
the retreat and event center has been designed
[25:34]
to avoid direct impacts to the on-site wetland,
[25:37]
riparian and shoreline habitat. There was also a
[25:41]
cultural resources survey that was conducted and they
[25:44]
found no evidence of archeological items and they
[25:48]
recommended no further archeological work to be warranted
[25:51]
in the project area, but a condition of
[25:53]
approval would still be the presence of inadvertent
[25:55]
discovery language standard for projects within the shoreline.
[26:01]
So in conclusion, the individual findings and conclusions
[26:04]
stated within the staff report establishes that the
[26:08]
proposal either meets or can be conditioned to
[26:10]
meet the Cowlitz County land use standards, the
[26:13]
campground code, the standards established in the shoreline
[26:17]
master program, and the criteria for granting a
[26:19]
substantial shoreline development permit within a shoreline of
[26:23]
the state. Completion of this project if constructed
[26:25]
and as conditioned within the staff report will
[26:28]
therefore be consistent with the Shoreline Management Act,
[26:31]
the County Shoreline Management Master Program, and existing
[26:34]
land uses nearby to the project area. Thank
[26:39]
you. I've got a few questions, Mr. Kritz.
[26:41]
Actually a number of them in no particular
[26:44]
order. Before I do so, I should mildly
[26:47]
correct myself on what happens after this hearing.
[26:54]
It's a bit more complicated than the simple
[26:57]
explanation I gave. So again, there are three
[27:00]
different things that are being sought today. A
[27:04]
shoreline substantial development permit, a shoreline conditional use
[27:09]
permit, and a campground binding site plan approval.
[27:14]
So each of those has a slightly different
[27:16]
path forward after today's hearing, which I wasn't
[27:20]
very good at explaining. So the shoreline substantial
[27:23]
development permit, if I approve it, then goes
[27:26]
to the Department of Ecology for a twenty
[27:29]
one day review process. That's simply to review
[27:32]
my decision and make sure that it is
[27:34]
consistent with requirements. The shoreline conditional use permit,
[27:41]
my decision is a recommendation only, and it's
[27:45]
not the final decision. Rather, the Department of
[27:48]
Ecology issues the final determination on a conditional
[27:52]
use permit. So that decision is made by
[27:55]
that agency based upon my decision. And then
[28:00]
thirdly is the campground binding site plan that
[28:04]
does not go to ecology and anyone who
[28:07]
wished to felt aggrieved by my decision there
[28:11]
would seek remedy through the county under the
[28:14]
Land Use Petition Act. So again, that's a
[28:17]
fuller explanation of all the things that are
[28:20]
taking place today. It's a bit more complicated
[28:22]
than the standard package. Okay. In no particular
[28:27]
order, Mr. Feitzler, I'd like to first to
[28:29]
talk about water, potable water. We have, what
[28:34]
I assume is a reliance on the existing
[28:36]
exempt well for water for this project. So
[28:46]
the project describes a caretaker's residence, a center,
[28:56]
two shower buildings, and then potable water necessary
[28:59]
for 30 some camping sites. That well cannot
[29:05]
exceed 5,000 gallons per day. And it's providing
[29:10]
water to a lot of individuals, including children.
[29:15]
If by comparison, we were talking about a
[29:18]
six lot subdivision using one well, we would
[29:23]
need to have a Class B well system
[29:26]
and all six of those houses would have
[29:29]
to share that 5,000 square or 5,000 gallons
[29:33]
of water per day and make sure that
[29:35]
they didn't use more than that. If we
[29:37]
were ahead of 20 lot division, we'd have
[29:42]
to have a class A water system. And
[29:44]
again, we'd have to have evidence that no
[29:46]
more water is being used than what is
[29:48]
allowed under law. What I'm concerned here is
[29:52]
I don't find a discussion about water use
[29:56]
and water restrictions. And I'm wanting to make
[30:02]
certain that if approved, this system would not
[30:07]
use more than it's allowed. And more importantly,
[30:10]
that the water being used by paying guests
[30:13]
is in fact a good water, clean water.
[30:17]
So I don't see any conditions or discussion
[30:22]
about water, it's limitations on capacity or limitations
[30:29]
on allowed use or upon its treatment. But
[30:34]
at a minimum, seems to me that this
[30:36]
should be a system that falls at least
[30:38]
under class B standards, perhaps under class A
[30:41]
standards for monitoring and regulation to ensure that
[30:46]
a lot of paying customers are in fact
[30:49]
utilizing clean water. So I'd like to come
[30:53]
back to that or let the parties come
[30:55]
back to that and perhaps there's more information
[30:57]
that I haven't received or is it something
[30:59]
that I need to receive more about? Do
[31:09]
you happen to know the answers to any
[31:12]
of those questions as we sit here? I
[31:15]
do not. I believe that they were just
[31:17]
going to acquire all necessary permits through environmental
[31:19]
health to verify the quality of the water
[31:22]
and receive their permits necessary for campground operation.
[31:30]
Let's change the water subject slightly to firefighting.
[31:36]
So what is the closest station to this
[31:44]
site? Do you know? I do not. The
[31:47]
initial site that was proposed has been closed.
[31:50]
Right. But the fire marshal provided comments that
[31:53]
indicated that they would have to meet all
[31:56]
international fire code in addition to the Cowlitz
[31:59]
County Code on Wildland Fire Urban or the
[32:02]
Wildland Urban Interface for Fire Protection. The fire
[32:12]
district did not elaborate on those requirements. They
[32:16]
did not, okay. And like projects elsewhere, it's
[32:21]
often been obligated where there's some distance from
[32:26]
an available station to expect a water reservoir
[32:33]
that maintains an assured minimum quantity and an
[32:40]
assured capacity that is fire pressure, how much
[32:43]
it can deliver, how quickly, etcetera. And so
[32:47]
I don't see any discussion about that and
[32:50]
I don't know what the district may have
[32:52]
meant by its comments. So I'm a little
[32:54]
bit curious about all that. Again, we were
[32:58]
on a dead end road where some distance,
[33:01]
substantial distance from any fire department or fire
[33:05]
station, I should say. And we're in the
[33:08]
woods with surrounding residences. Firefighting has been a
[33:13]
concern expressed by a number of written comments.
[33:16]
And so I share that concern. I'm curious
[33:20]
as to some of the answers to those
[33:22]
questions. There is a discussion of there being
[33:31]
fire pits on the site. I think there's
[33:33]
two proposed pits. Do you know where they
[33:35]
are located? I do not. Okay. Again, I
[33:44]
apologize for these questions being somewhat all over
[33:47]
the place. There's no particular order to them,
[33:49]
bear with me. As to the proposed septic
[33:54]
system, the diagram that you have pulled up
[34:00]
shows the primary and reserve drain fields in
[34:04]
proximity to, well, all other development as well
[34:08]
as to the flood plain and flood way.
[34:13]
It doesn't, where would I look to find
[34:16]
the tank? I don't see it. I believe
[34:33]
the Joma Design may be able to answer.
[34:36]
Okay, sorry. Here's my question. In a similar
[34:40]
project I was asked to consider in Lewis
[34:42]
County. In that instance, there was a public
[34:49]
restroom facilities with tanks that were within or
[34:55]
near floodway. And in that instance, it was
[34:58]
required that those tanks be sealed so that
[35:01]
they can't be surcharged by floodwaters and forced
[35:04]
open just by the hydro, the power of
[35:08]
water. And so again, I don't see any
[35:12]
discussion here of wastewater system and its management
[35:18]
to assure that floodwaters cannot invade and degrade
[35:24]
that system. Do you happen to know any
[35:27]
of the answers to that question? Yes, sorry,
[35:30]
I did not elaborate in the staff report.
[35:32]
16.25, I conditioned that they would follow all
[35:35]
requirements of that. That is our floodplain management
[35:37]
ordinance, which identifies that on-site sewage treatment facilities
[35:43]
must be properly located or designed to avoid
[35:47]
infiltration of floodwaters and discharge of waste into
[35:50]
flood water. And that's wastewater. Let's turn to
[36:02]
storm water. Briefly, if you could describe for
[36:11]
me the stormwater plan, and again, the applicant
[36:17]
undoubtedly can do that more fully, but to
[36:20]
your understanding of the stormwater plan and particularly
[36:26]
whether it is requiring stormwater for all existing
[36:31]
improvements since we are converting their use, they're
[36:35]
no longer exempt from storm water requirements. And
[36:39]
so there needs to be a demonstration that
[36:41]
whatever collective storm water system is receiving and
[36:47]
treating not just the new stormwater, but all
[36:51]
stormwater from the past and future. And I'm
[36:55]
curious if you know that whether or not
[36:57]
that's been addressed. I believe Public Works could
[37:01]
address that. They manage the stormwater aspect, but
[37:04]
I do know that the project would be
[37:06]
viewed cumulatively, not just for the new proposed
[37:08]
development and that the stormwater plan would have
[37:10]
to address that. All right. One of the
[37:34]
things I am obligated to do, or one
[37:37]
of the findings I need to make with
[37:40]
respect to the campground is that I find
[37:43]
compatibility with surrounding uses. Uses. That's not required
[37:48]
at the shoreline permits, but is required at
[37:50]
the campground permit. And so I wanna talk
[37:53]
about compatibility a little bit. In particular, I
[37:59]
don't see a set of proposed rules for
[38:02]
this campground. I take the staff report as
[38:08]
suggesting that the applicant will be expected to
[38:11]
establish rules, but I think there's a chicken
[38:15]
and egg thing going on here. I think
[38:17]
I need to see those rules. I don't
[38:19]
think it's, I can leave that to anybody
[38:21]
else. I think any rules for the use
[38:24]
must come before me and I must decide
[38:26]
if they're satisfactory. Otherwise I can't determine compatibility.
[38:31]
So just as a heads up, I'm gonna
[38:34]
need to see a proposed collective set of
[38:36]
rules for operation to determine whether in fact,
[38:42]
restricted that the project would in fact be
[38:45]
compatible with its surrounding uses. And that might
[38:49]
include active hours, quiet hours, noise limitations, restrictions
[38:57]
on pets, restrictions on fireworks and firearms, any
[39:06]
other restrictions that may be appropriate. And so
[39:11]
that collective set needs to be put together
[39:15]
and I need to examine it for its
[39:18]
consistency. Let's turn to landscaping. I understand that
[39:27]
the project relies on existing landscaping to the
[39:31]
west, that being the applicant's remaining 10 acres.
[39:35]
It's effectively a 10 acre park next to
[39:38]
the site providing substantial vegetative buffering to properties
[39:43]
to the west. Properties to the north are
[39:45]
largely separated by county roads. And so we
[39:48]
have a separation already, as well as the
[39:52]
vegetation that lies to the north of the
[39:54]
entrance driveway. When I am to the south,
[39:57]
obviously we a natural buffer in the river.
[40:03]
To the east is where I'm a little
[40:04]
bit less certain as to the buffering. The
[40:08]
applicant proposes to maintain a vegetative buffer on
[40:11]
its borders. And that's why we come back
[40:15]
to this cabin to the east and it's
[40:18]
screening from this project. And so I do
[40:22]
certainly see extensive vegetative buffering along the Northeast
[40:26]
Corner, but south of that buffering, I'm wondering
[40:30]
what's intended to ensure that no part of
[40:34]
this use or any of its guests wander
[40:37]
into adjoining properties to the east. And so
[40:42]
any thought given about that today? Yes, a
[40:45]
condition of approval would be plantings and screening
[40:47]
set up to provide protection to the Southeast
[40:50]
Corner. Okay. And while a fence might in
[40:57]
many instances be considered an appropriate buffer, we're
[41:01]
in shoreline territory and fences would be inconsistent
[41:05]
with shoreline restrictions. Mr. Kreitzert, would you maybe
[41:16]
for the benefit as much for the public
[41:19]
as for me, give me a quick summation
[41:24]
of the mitigation plan for the impacts to
[41:29]
primarily to wetland buffers, as well as to
[41:32]
some extent as part of the conditional use,
[41:35]
guess. Tell us a little bit more about
[41:38]
mitigation on-site to those impacts. Yes, of course.
[41:44]
I believe Ashiko may be able to add
[41:47]
additional information, but they were proposing to place
[41:50]
signs and indicators to avoid wetland buffer in
[41:54]
addition to a replanting and mitigation plan to
[41:57]
provide natural vegetation to offset any of the
[41:59]
potential impacts to the wetland buffers that would
[42:04]
be created through development as proposed. Okay. And
[42:08]
it's fortuitous that we have in front of
[42:11]
us the aerial photo showing not only the
[42:16]
existing conditions, but proposed changes To the southerly
[42:23]
portion of the site, there's a lot of
[42:25]
bright greenish yellow dots. Are those proposed mitigation
[42:30]
plantings? Yes, I believe so. Okay. So the
[42:37]
mitigation plan proposes to plant through that area
[42:42]
to improve? My mistake, it's existing trees. Oh,
[42:47]
those are existing trees. Okay. So the new
[42:50]
vegetation or added vegetation for mitigation would be
[42:54]
rare relative to those trees. The the hashed
[43:05]
portion on the bottom portion of the project.
[43:19]
A one to one wetland buffer enhancement on
[43:23]
the southwest corner. Oh, okay. Alright. So it'd
[43:28]
be southwest of those trees in the portion
[43:31]
between the orange and blue lines? Yes. Okay.
[43:36]
Strip all the way along. That's in addition
[43:44]
to a strip along the ordinary high watermark
[43:47]
for one one enhancement. Where is that? Along
[43:53]
the southeast portion in between the maroon or
[43:56]
red line and the blue line. Okay. Okay.
[44:11]
At the request of the, I'm not sure
[44:16]
if it was DNR or Forest Fish and
[44:19]
Wildlife, think it was Fish and Wildlife, you
[44:21]
imposed certain proposed language restricting access to the
[44:26]
river during March to June in protection of
[44:31]
salmonoid fry. But it's a discouragement. It's not
[44:40]
an actual restriction on access to the river
[44:44]
during that time. The proposed language is a
[44:47]
bit in between. It's not really doing anything
[44:52]
other than kind of finger wagging without actually
[44:59]
guaranteeing that the river is kept in violet
[45:02]
during that time. Any thoughts on, I mean,
[45:06]
how does the county feel about that? Is
[45:07]
it feel that's good enough? Does it have
[45:10]
any thoughts about making sure that if the
[45:13]
project is approved, that there'll be no net
[45:16]
loss of the biological function of the river
[45:19]
relative to salmonoid species. What does the county
[45:23]
think? I believe as proposed, it meets the
[45:31]
Callis County code for protection for the buffers
[45:36]
and for the ecosystem. But that is a
[45:41]
condition that we can revisit to further ensure
[45:43]
that there is no, me try that in
[45:47]
a less subtle way. If I were to
[45:50]
approve this project ultimately after everything, and I
[45:55]
insisted, I imposed a condition that there would
[45:57]
be no river access during those months, How
[46:00]
would the county respond to that? Think we'd
[46:06]
like to hear, sorry, could I be sworn
[46:08]
in? Yes. So you sworn, you swear to
[46:10]
tell the truth, the whole truth and nothing
[46:12]
but the truth. Yep, Adam Trimble, Planning Manager.
[46:15]
And so again, if the applicant is accepting
[46:19]
of that condition, then that would be the
[46:22]
condition that the county recommends for approval. As
[46:28]
proposed with mitigation submitted, the applicant has prepared
[46:35]
a plan that would keep that river intact
[46:38]
during those months with signage and various other
[46:42]
controls of their property. So the condition as
[46:46]
written is our initial recommendation, but the applicant
[46:50]
and the county may wish to agree that
[46:53]
a more strict conditional approval is necessary. Well,
[46:57]
that's not how, okay. The parties can talk
[46:59]
about it and think about suggesting something. The
[47:03]
question I was posing is if I say
[47:04]
it, if I intend to do that, does
[47:08]
the county have some strong opposition to my
[47:10]
doing so and why? That was what I
[47:14]
was trying to ask. The county's recommendation is
[47:22]
in the staff report. The restriction and the
[47:27]
amenity of this property is the river. So,
[47:29]
you know, right now the position of the
[47:31]
county is that the applicant can manage that
[47:34]
access and control it and protect the river.
[47:36]
Okay. I think we're about there, Mr. Kreitzer.
[47:53]
Let me just double check. Those do complete
[48:03]
the questions I have for county staff. And
[48:05]
does that complete then the county's presentation? Yes,
[48:08]
it does. We'll turn then to the applicant
[48:12]
and, oh, one last housekeeping matter. The county
[48:18]
was relying upon a PowerPoint presentation for its
[48:22]
testimony today. I wanna make that presentation an
[48:25]
exhibit that becomes exhibit 100. And I wish
[48:31]
a copy sent to me electronically following the
[48:34]
hearing. So as to the applicant then, who
[48:46]
am I to anticipate hearing from today? Good
[48:49]
morning. And you are? Good morning, Mr. Hearing
[48:56]
Examiner. My name is Byron Johlma with Johlma
[49:00]
Design. And I'm here to my left is
[49:04]
Andrea Aberle with Asheco. And how is Asheco
[49:10]
spelled? A S H E C O. Okay,
[49:15]
thank you. Are you anticipating that both of
[49:20]
you will testify today? Well, I anticipate that
[49:25]
Ms. Aberlewy will be responding to the questions
[49:29]
regarding the environmental, the critical areas. And we
[49:33]
also have in attendance virtually the traffic engineer
[49:37]
as well. Mr. Chris Klimau. And how is
[49:49]
his last name spelled? C L E M
[49:53]
O W. Okay. So again, Mr. Joelma, this
[50:00]
is the applicant's opportunity to testify in response
[50:03]
to the county's presentation, which is then my
[50:07]
first question is, does it wish to make
[50:10]
the presentation and who or how many different
[50:14]
people will be making that presentation? Yes, sir.
[50:17]
So we would just like to, we'll keep
[50:20]
our comments brief. We would like to introduce
[50:22]
the project briefly and then would be. Which
[50:26]
is all great. I anticipate that. I just
[50:28]
need to know who is doing it to
[50:29]
know who to swear in as witnesses. Roger
[50:33]
that, yeah. So myself, Byron Joma and Andrea
[50:39]
Aberle, then then possibly Considering the, yes, Any
[50:46]
of the comments related to the traffic concern,
[50:48]
Mr. Cleemaw will Okay. As well. So as
[50:51]
to you and Ms. Aberle, let's just have
[50:54]
you collectively sworn, do the two of you
[50:56]
swear or affirm to tell the truth, the
[50:58]
whole truth and nothing but the truth? I
[51:00]
do. All right. It's yours to proceed as
[51:03]
you prefer. So go ahead. Yes, good morning,
[51:08]
Mr. Arias Amater, members of staff and those
[51:12]
public who are in attendance. My name is
[51:15]
Byron Johlman with Johlman Design and I am
[51:19]
the project engineer of record. And as mentioned,
[51:24]
I also in attendance are the biologist Andrea
[51:29]
Aberle and the traffic engineer Chris Deverclimao. And
[51:35]
yeah, like I said, I'll keep my comments
[51:38]
brief here. We have no objections to the
[51:42]
current conditions outlined in the staff report. I
[51:46]
can answer a couple of the questions that
[51:50]
you had regarding the fire pit and the
[51:53]
well as well. I wanna have a little
[51:56]
clarification there. I also understand that there is,
[52:02]
and there's been many concerns brought forward by
[52:07]
the neighbors and in a perfect world, the
[52:12]
reports and studies and plans that we prepared
[52:15]
would satisfy those concerns. However, we also take
[52:22]
them very seriously. The comments, particularly in the
[52:25]
neighbor, those that live nearby, this is their
[52:30]
neighborhood. We acknowledge and respect that. And I
[52:34]
also speak for the owner as well. And
[52:38]
we will be paying close attention to the
[52:41]
comments made. We do stand by the design,
[52:46]
the reports. Stand by the project has been
[52:50]
well vetted. We believe the staff has done
[52:53]
an outstanding job of ensuring that the project
[52:58]
complies with the applicable code. And as I
[53:06]
said, we understand there's several concerns with the
[53:10]
neighbor and with the neighbors. And although we
[53:15]
may not be able to answer all of
[53:16]
those or address them here today, we're gonna
[53:18]
do our best. And I'll also be available
[53:21]
afterward, after the hearing, if anybody wants to
[53:26]
speak to me personally, and I will bring
[53:28]
those concerns and ideas forward or pass them
[53:33]
forward to the owner. And with that, if
[53:38]
you, oh yeah, I'll clarify. So the fire
[53:42]
pits will be propane. And at this juncture,
[53:47]
I don't believe we show a specific location
[53:51]
on the plans. Those will be determined, but
[53:53]
they'll be in compliance with all applicable building
[53:57]
and fire code. And then there is a
[54:00]
new well proposed and it is shown on
[54:03]
the plans, I believe in the, is that
[54:09]
in the Northeast Corner? Yes, sir. That's correct.
[54:12]
The Wellhead Radius. Yes, sir. That's correct. So
[54:14]
a new well will be installed prior to
[54:20]
occupancy. But it's proposed as an exempt well?
[54:28]
It's proposed as falling within the 5,000 gallon.
[54:31]
Oh yes, sir. That is correct. Yes, sir.
[54:33]
Yep. Have you had any, oh, I'm sorry.
[54:42]
Were you, you have any more to say
[54:44]
or? No, Nope. Entertain any questions? Have you
[54:48]
had any conversations with public health about the
[54:52]
well and its requirements today? Personally, I have
[54:56]
not, my staff has, and we've also been
[54:58]
working with a well driller. And those discussions
[55:06]
did come up with regard to the need
[55:09]
for a Class B or a community well
[55:13]
system and we would certainly not object if
[55:16]
it was found that it fell under those
[55:18]
provisions. However, we are, like I said, we
[55:23]
stand by the opinion or our assessment that
[55:28]
it does not meet those requirements. Give me
[55:46]
a second, Mr. Joelma. As the engineer, you
[55:54]
would be the one more familiar with it,
[55:56]
stormwater management. And to where, what stage are
[56:01]
you in stormwater management design? This would be
[56:06]
a preliminary stormwater design. However, typically at this
[56:10]
stage, we, because of the, it is a
[56:14]
critical component that we put a lot of
[56:16]
effort into the design to ensure that it's
[56:18]
feasible. We are proposing low impact development BMPs,
[56:24]
and Kalama River is exempt from the flow
[56:29]
control standards, but all runoff, including runoff from
[56:34]
existing impervious or pollution generating services or surfaces
[56:40]
that will mingle with storm water from pollution
[56:43]
generating services will be treated and managed in
[56:48]
accordance with the stormwater management manual for Western
[56:53]
Washington. And how will it be resolved? Meaning
[56:58]
it will infiltrate, will it anticipate to drain
[57:02]
to some sort of retention facility? What is
[57:05]
proposed? What's currently proposed is a combination of
[57:11]
splash blocks where it will disperse through vegetated
[57:19]
vegetated soils that may be amended as needed
[57:25]
to meet the treatment standard and sheet flow
[57:29]
dispersion. As mentioned, these are low impact development
[57:33]
principles where the storm water is managed as
[57:37]
close as possible to the point where it
[57:40]
falls. We are not proposing any detention. As
[57:43]
mentioned previously, the Glamour River at this location
[57:48]
is exempt from the flow control standards. So
[57:52]
therefore, detention is not required. To date, has
[58:08]
the applicant begun preparation of a set of
[58:11]
rules of operation? To my knowledge, no. However,
[58:19]
I will pass that question on to the
[58:24]
owner. I would be very surprised if that
[58:27]
has not at least been is not in
[58:33]
some type of draft form or isn't, but
[58:35]
we will, yeah, we will pass that along
[58:38]
to and you're talking about just a set
[58:41]
of rules, not really necessarily like CCNRs, but
[58:44]
more of just the operations and the rules
[58:47]
of the campground. CCNRs would not apply, but
[58:50]
a set of rules would. Right, yeah. And
[58:52]
that's what I'm interested in. Okay. Okay. I
[59:03]
don't have any other questions, Mr. Joma. And
[59:08]
so did, Ms. Eberle, were you going to
[59:17]
speak as well? Mr. Eberle, front of me,
[59:21]
one topic that was brought up was regarding
[59:25]
the septic tanks and your concern that they
[59:29]
are not shown on the plans. Oh yes.
[59:32]
If not, yeah, took another look. I do
[59:34]
not see them shown a lot of times.
[59:38]
I mean, we're relying on the septic designer
[59:42]
and at this phase, they would typically be
[59:44]
more of a, probably a schematic layout anyway.
[59:47]
However, we've, at the time of construction, as
[59:51]
mentioned and in the conditions of approval, they
[59:55]
will be installed either outside of the flood
[59:57]
plain where they could be susceptible to inundation
[1:00:00]
with water, or if necessary to install them,
[1:00:04]
they will be constructed with the appropriate features
[1:00:10]
to prevent the infiltration of surface water. Okay,
[1:00:19]
thank you. Thank you. And so again, did
[1:00:21]
you anticipate Ms. Aberleaf's testimony as well? I
[1:00:27]
can go over a few elements. I think
[1:00:29]
everything's been covered. It's up to you. Or
[1:00:34]
do you wanna just respond? I'll just clarify.
[1:00:38]
Sandra, Avery Averly Ashikosolutions. As far as the
[1:00:43]
critical areas go, there's the type S water,
[1:00:49]
the shoreline, obviously the Clam River. Depicted on
[1:00:54]
there that we're most concerned about is the
[1:00:59]
shoreline buffer and setback, which the shoreline buffer
[1:01:02]
is the first 150 feet from Ordinary High,
[1:01:05]
and then there's additional 10 foot building setback.
[1:01:07]
So the combined buffer and setback is one
[1:01:09]
sixty. And that's the line that was held
[1:01:13]
by all new development regarding the project as
[1:01:18]
required by the Shoreline master plan. There is
[1:01:24]
a 200 foot offset depicted for the traditional.
[1:01:27]
But in this case, the full one hundred
[1:01:28]
year floodplain is the full extent. The shoreline
[1:01:32]
extends to the full outer limit of the
[1:01:35]
one hundred year floodplain. The impacts that we
[1:01:41]
are required to calculate are for within that
[1:01:44]
inner 160 and or the wetland buffer that
[1:01:49]
is 300 feet in this case. There was
[1:01:51]
not a mapped wetland on-site, but we delineated
[1:01:54]
one for riverine wetland we found along the
[1:01:58]
shoreline that had a 300 foot buffer so
[1:02:02]
on the other the site plan from our
[1:02:05]
critical areas report mitigation plan The aerial view
[1:02:07]
of that one. Impacts the buffer impacts proposed
[1:02:12]
are in the light aqua solid shading, which
[1:02:16]
consists of the primary septic, the new parking,
[1:02:21]
and required fire turn turnaround around the existing
[1:02:24]
structure, a deck, and a patio. But those
[1:02:28]
all are outside the one sixty shoreline buffer
[1:02:34]
and setback as required by the shoreline master
[1:02:37]
plan. Anything outside that requires is still calculated
[1:02:42]
as an impact and requires mitigation. But as
[1:02:45]
far as any new development, it's outside that
[1:02:50]
inner restricted area. To offset those impacts, there's
[1:02:54]
shoreline buffer enhancement proposed within the aqua plus
[1:02:58]
hatched area. So two areas along the south.
[1:03:03]
And generally, we locate those in the area
[1:03:06]
to extend where there's any existing tree line.
[1:03:11]
And in this case, fairly linear to provide
[1:03:15]
a buffer between the project and the shoreline.
[1:03:22]
And just to clarify, they are using historic
[1:03:29]
footprints from structures. There's no new building proposed
[1:03:36]
within the floodplain or shoreline as far as
[1:03:38]
the structure with the exception of the flat
[1:03:44]
surfaces, the parking, which I only say that
[1:03:50]
because in shorelines, if you build up, generally
[1:03:52]
take away from the volume of the flood
[1:03:55]
plains you have to excavate. But in this
[1:03:56]
case, we don't need to do that. It's
[1:03:58]
not a requirement. So a couple of questions,
[1:04:00]
Ms. Iberly. The mitigation plan is a one
[1:04:03]
to one ratio. Correct. I don't know if
[1:04:06]
there is any overarching required ratio, but ratios
[1:04:13]
vary greatly. Oftentimes they can be no less
[1:04:17]
than one to one to achieve no net
[1:04:19]
loss, but oftentimes they're expected to be greater
[1:04:23]
than one to one depending on the circumstances
[1:04:25]
and the imposition. In this case, why do
[1:04:28]
you feel the one to one ratio is
[1:04:29]
appropriate? One to one is standard when it's
[1:04:33]
an impact of herbaceous or grass vegetated area
[1:04:38]
in the outer portion of the buffer, which
[1:04:40]
it is. No significant vegetation, trees, shrubs are
[1:04:46]
proposed for removal. That's the one to one
[1:04:50]
is generally accepted ratio. Otherwise, you're correct. It
[1:04:53]
can be greater than that if you are
[1:04:54]
impacting more significant habitat or in the inner
[1:04:57]
portion of the buffer. And then this is
[1:04:59]
a question more for the benefit of the
[1:05:01]
Department of Ecology. Why the need for new
[1:05:05]
parking within the expanded shoreline jurisdiction, hence the
[1:05:10]
conditional use permit. We did utilize the existing
[1:05:19]
impervious surface to the full extent practicable. That's
[1:05:23]
my understanding that new parking was a requirement
[1:05:25]
to meet the design criteria under code. Okay.
[1:05:31]
Let me paraphrase, which is a way of
[1:05:33]
you telling me if I'm following closely that
[1:05:38]
to meet other code requirements, the facility needs
[1:05:42]
more parking. And the only place based on
[1:05:47]
topography and existing buildings and environmental restrictions is
[1:05:53]
the proposed area of additional parking. Am I
[1:05:56]
summarizing your position correctly? Correct. Okay. All right.
[1:06:04]
Okay. And one other comment, I guess, I'll
[1:06:09]
make. I have met with Fish and Wildlife
[1:06:11]
and Department of Ecology staff on-site, got the
[1:06:14]
recommendations, and they didn't have any other outstanding
[1:06:22]
comments that weren't implemented into the project. Oh,
[1:06:27]
and as far as the trail use, we
[1:06:29]
added that in and the signage to meet
[1:06:32]
Fish and Wildlife's recommendation. And as far as
[1:06:39]
the time frame you're concerned about March through
[1:06:42]
June that would be posted on signage, it's
[1:06:45]
my understanding there wouldn't be a lot of
[1:06:46]
use, very, very minimal if any of the
[1:06:50]
site during that time, but that's up for
[1:06:53]
the applicant to provide more insight on possibly.
[1:06:58]
K. Anything else? That's all I have. And
[1:07:05]
you are speaking on behalf of the applicant.
[1:07:07]
The applicant isn't speaking separately, am I correct?
[1:07:13]
Say again. The two of you are here
[1:07:15]
on behalf of the applicant. The applicant isn't
[1:07:18]
presenting separately, correct? Correct, affirmative. I also did
[1:07:24]
wanna, yeah, I did have a quick text
[1:07:27]
exchange with one of the owners representatives and
[1:07:35]
they said that there is a draft set
[1:07:39]
of operating rules and we will be paying
[1:07:43]
close attention to the concerns here and if
[1:07:46]
necessary, rules will be amended as needed and
[1:07:51]
presented to you for review, Mr. Hearing Examiner.
[1:07:59]
Do you wish to present the testimony of
[1:08:02]
your traffic engineer as well? At this juncture,
[1:08:06]
I will stand by for and have him
[1:08:10]
respond as needed to the public comments. I
[1:08:16]
think that would be a more efficient use
[1:08:18]
of everyone's time. Okay. So we've heard from
[1:08:23]
county staff, we've heard from the applicant. Now
[1:08:26]
we come to the third phase of today's
[1:08:28]
hearing, which is the public testimony. And so
[1:08:34]
Mr. Kreitzer or Mr. Trimble, someone have a
[1:08:37]
sheet of those who might like to be
[1:08:39]
heard? Thank you. So as I said before,
[1:08:52]
this sheet is not binding in any way,
[1:08:55]
one way or another. If you signed up,
[1:08:58]
but then no longer interested, you can just
[1:09:02]
let me know. You're not obligated to follow
[1:09:05]
through. If you didn't sign up, but what
[1:09:07]
you would like now to be heard after
[1:09:09]
you heard other things, you can let me
[1:09:12]
know. There's nothing fixed about this sheet as
[1:09:15]
we get started with it. And in advance,
[1:09:19]
I apologize for the mispronounced the issue of
[1:09:23]
anyone's name. I think with a name like
[1:09:25]
Scheipmeier, I would be sensitive to getting names
[1:09:28]
correct, but I understand also how it doesn't
[1:09:31]
work very well sometimes. And so just forgive
[1:09:34]
me in advance if I do injustice to
[1:09:36]
your name. So the first name I have
[1:09:40]
on the sheet is Jeff, is it Bottart?
[1:09:45]
Yeah, I think your name's Jeff. Yeah, I
[1:09:47]
get it. It may take me longer than
[1:09:50]
five minutes. I just have history. I've been
[1:09:53]
out there sixty Thank you, I'll come back
[1:09:55]
to you. There must be a sound system
[1:10:00]
in here that's picking up everybody without All
[1:10:03]
of the mics are hot. And there must
[1:10:06]
be mics that are picking up the audience
[1:10:08]
as well. The audience is invited to speak
[1:10:13]
here. Well, know, but they seem to be
[1:10:15]
coming in quite well, even when they sit
[1:10:18]
at their chairs is, but you would still
[1:10:20]
prefer that they come to the table. Okay.
[1:10:23]
All right. Yeah, it's a bit eerie or
[1:10:29]
unsettling how much is being picked up by
[1:10:32]
these microphones. This one, so I'm maybe we
[1:10:35]
could. Yeah, we will ask people to come
[1:10:38]
to the microphone to Mr. Kreutzer's right at
[1:10:41]
the open table. So the next is Michael
[1:10:44]
Grimes. Mr. Grimes. I'm not flu y'all well.
[1:10:58]
Morning, miss Thank you, mister Hearing, examiner. Let's
[1:11:01]
have you sworn. Do you swear or affirm
[1:11:03]
to tell the truth? The whole truth and
[1:11:04]
nothing but the truth. I do, sir. Go
[1:11:06]
ahead. Lived up there for twenty five years
[1:11:10]
and to say that road is safe and
[1:11:12]
it'll all be high fine and dandy is
[1:11:17]
misconstrued at best. I've seen no evacuation plan.
[1:11:23]
We have a lot of slides on that
[1:11:24]
road. We have a lot of trees across
[1:11:27]
the road. And the number one concern since
[1:11:31]
I've lived there for twenty five years is
[1:11:33]
fire damage. We have nice evening wind that'll
[1:11:39]
blow 10 to 15 miles an hour. It's
[1:11:43]
a one way in, one way out road.
[1:11:46]
If you don't know how to get out
[1:11:47]
of, how you going to get all those
[1:11:48]
people out of that bottom area in RVs
[1:11:53]
and whatever else they drove in and everybody
[1:11:56]
else is trying to get off that mountain
[1:11:59]
without there being a real problem. What happens
[1:12:03]
if there are people there? We get snow
[1:12:05]
at 18 inches of snow in April. What
[1:12:09]
happens when it snows and we have some
[1:12:11]
kind of problem? The only way is a
[1:12:14]
Weyerhaeuser will open up a travel corridor and
[1:12:18]
you're not getting an RV up it. I
[1:12:20]
can tell you that now. It's all a
[1:12:22]
four wheel drive can do sometimes to get
[1:12:25]
up that road. The intersection is got about
[1:12:28]
100 feet of visibility. You get an 80
[1:12:32]
pound log truck coming down that road. With
[1:12:35]
80 feet of visibility before an RV pulls
[1:12:38]
out, you're gonna have an accident. It's not
[1:12:41]
a question of if it's gonna happen, it's
[1:12:43]
gonna be when it happens. They don't have
[1:12:46]
the stopping ability at that range. Also, we
[1:12:51]
had an RV come out of there. Nice
[1:12:53]
silver one. It drove 18 miles an hour
[1:12:56]
down that road all the way to the
[1:12:58]
freeway. The congestion, you're gonna have people that
[1:13:05]
have never driven that road. It's a small,
[1:13:07]
narrow, winding road with heavy equipment, dump trucks,
[1:13:11]
log trucks, log cutting equipment that they'll have
[1:13:14]
to negotiate and deal with. What about all
[1:13:18]
the people that are gonna maybe go wanna
[1:13:20]
take a bicycle ride up there? Extremely dangerous.
[1:13:25]
The water safety, I've heard people address the
[1:13:28]
war runoff. What about the migratory birds? The
[1:13:32]
comb rats, the eagles, and everything else that
[1:13:36]
lives down there. I've sat across and hunted
[1:13:39]
that entire mountain system across from them. There's
[1:13:43]
all kinds of animals that use that crossing
[1:13:46]
right there because of the way it's all
[1:13:48]
configured. The quietness. What about all the racket
[1:13:56]
that's gonna come with this? What happens when
[1:13:59]
something does happen? You think mister Irish is
[1:14:03]
gonna care because he's not gonna be here.
[1:14:06]
It'll just be us like it is in
[1:14:08]
every other small town across this country. It'll
[1:14:11]
be left up to us to deal with.
[1:14:14]
County looks at it from the money, he
[1:14:17]
looks at it from the money, and we're
[1:14:19]
just gonna be left holding the bag. Thank
[1:14:22]
you. Thank you. Tiffany Takawa. Morning. Hi, this
[1:14:41]
frustrates me in that, can I have you
[1:14:44]
move that over? Absolutely. So we can have
[1:14:48]
a visual with each other and all the
[1:14:50]
witnesses. This is, this room is driving me
[1:14:53]
crazy. And sorry, let's get you sworn. You
[1:14:59]
swear our firm to tell the truth, the
[1:15:00]
whole truth and nothing but the truth. I
[1:15:02]
do. Go ahead. So I'm not necessarily for
[1:15:05]
or against, but I am, we are one
[1:15:08]
of the neighbors that is closest. We're the
[1:15:10]
first house on Greenwood. And some of my
[1:15:15]
concerns that were not in my letter that
[1:15:17]
I thought of afterwards are would any campers
[1:15:20]
be allowed to live there permanently? And if
[1:15:26]
there's like a campground manager, would those persons
[1:15:31]
or people be there permanently or only when
[1:15:34]
there's an event? Is there a limit to
[1:15:38]
total number of guests? Say, if they're not
[1:15:42]
expecting any events between what did they say
[1:15:47]
March and June, what if someone wants a
[1:15:49]
May wedding with 100 people? Just thinking about
[1:15:53]
that and the traffic that could come from
[1:15:56]
that, there's Even only a certain number of
[1:16:00]
parking spots. Right? Would the guests be informed
[1:16:06]
in advance of how curvy and up and
[1:16:10]
down Kalama River Road is? Because yeah, there
[1:16:14]
are some people that go extremely slow. There's
[1:16:16]
some people that go fast, especially if it's
[1:16:21]
January and we know that there are certain
[1:16:24]
icy spots that no one who's not familiar
[1:16:28]
with the road are gonna know about. We
[1:16:31]
all know those icy spots, but you can't
[1:16:33]
see them. So whether it's a car, a
[1:16:37]
car with you're pulling a trailer, whatever, that's,
[1:16:41]
I would want them to, people to be
[1:16:44]
informed of actually what kind of road this
[1:16:46]
is and the fact that there are log
[1:16:48]
trucks. Sometimes those log trucks are close to
[1:16:50]
the center line, you know, barreling down. And
[1:16:55]
then morning traffic say between, I mean, the
[1:16:58]
log trucks started four or five in the
[1:17:01]
morning, but say between six and nine, I
[1:17:03]
would want priority for the log trucks and
[1:17:07]
people going to work and people going to
[1:17:09]
school rather than anyone pulling out of the
[1:17:13]
campground and leaving, adding to the traffic at
[1:17:17]
that time of day. Oh, let me see.
[1:17:24]
That was, yeah, that's all I can think
[1:17:27]
of. I'm glad you mentioned about the fireworks.
[1:17:30]
Thank you for that. Sure. That is a
[1:17:33]
concern. Alright, thank you. Thank you. Ms. Scout
[1:17:38]
didn't quite ask questions of staff, but it
[1:17:41]
prompts me to remind, you're good. If you
[1:17:45]
have questions that you feel should be responded
[1:17:49]
to by the applicant or the county, you
[1:17:52]
don't ask them to those parties directly. If
[1:17:55]
you have any such questions, you ask them
[1:17:57]
to me. I'm the traffic cop for all
[1:18:00]
questions. Otherwise I lose control of the hearing
[1:18:03]
very quickly if there gets to be an
[1:18:06]
ongoing back and forth. And so everything would
[1:18:09]
come to me all then. If you do
[1:18:11]
have a question, I'll come back to it.
[1:18:13]
I make notes as to all questions that
[1:18:15]
are raised, and then I decide who should
[1:18:17]
best answer them. So I don't think I
[1:18:20]
had anything out of that that I need.
[1:18:22]
There are some things I'll follow-up on, but
[1:18:24]
not necessarily a specific question. If anyone does
[1:18:27]
have questions, post them to me. I'll post
[1:18:29]
them to the right people. Michael Okay. Golub.
[1:18:46]
Good morning. Good morning, sir. Let's have you
[1:18:48]
sworn, do you swear or affirm and tell
[1:18:49]
the truth, the whole truth and nothing but
[1:18:51]
the truth? I do. Go ahead. My name
[1:18:54]
is Michael Golub. I'm representing Clark's Comenia Fly
[1:18:57]
Fishers, a fishing club that has over 200
[1:19:00]
members with the mission of the preservation of
[1:19:03]
wild fish. Wild steelhead and salmon are both
[1:19:07]
endangered species. The Upper Kalama River above the
[1:19:10]
upper hatchery is fondly known as the holy
[1:19:13]
water, as it is the breeding ground of
[1:19:16]
the for these fish. Only wild fish are
[1:19:19]
released above the hatchery. The key to wild
[1:19:22]
fish is clean, cool water. Has anyone conducted
[1:19:27]
a red survey that fish are not spawning
[1:19:31]
in this area? So I appreciate that they
[1:19:34]
talked about the fries coming down and protecting
[1:19:36]
them. But what about the adult fish going
[1:19:39]
up to spawn? The impact of the sewage,
[1:19:45]
we talked about that to some degree, but
[1:19:48]
what about groundwater seepage? It says only a
[1:19:51]
mile upriver of the hatchery. So in a
[1:19:57]
case where there's any seepage in that, the
[1:19:59]
first place is to stop at the hatchery
[1:20:01]
where thousands of fish are managed every year.
[1:20:10]
The additional point is the wild fish are
[1:20:15]
all captured at the hatchery. These fish then
[1:20:20]
being traumatized going through that, being captured, oftentimes
[1:20:25]
tagged for good reasons because there's a lot
[1:20:28]
of environmental studies going on about trying to
[1:20:31]
establish a wild population of fish in the
[1:20:33]
Kalama River. They are traumatized. They come out
[1:20:39]
of the hatchery. They send them out a
[1:20:41]
chute into the river. Where is the first
[1:20:43]
place that they stop and rest? Less than
[1:20:47]
a mile up the river is this proposed
[1:20:51]
site. Those fish need clean, cool water, and
[1:20:56]
they need a place to rest and it
[1:20:57]
needs to be, you know, they can't be
[1:20:59]
people splashing around on a river. So, the
[1:21:02]
time frame to March to June, I don't
[1:21:04]
think accounts for that. There there are two
[1:21:09]
runs of steelhead on this river. A spring,
[1:21:12]
a summer run, and a winter run. So
[1:21:15]
there are fish in that river constantly going
[1:21:17]
through this area to either get to spawning
[1:21:20]
grounds or to spawn there. So we are
[1:21:25]
opposed to this endeavor. And we believe that
[1:21:30]
the conditions for to protect wild fish have
[1:21:35]
not been adequately considered at this time. Thank
[1:21:39]
you. Thank you. Next, I have Brian Davern.
[1:22:08]
Good morning. But have you sworn? Do you
[1:22:10]
swear or affirm to tell the truth, the
[1:22:11]
whole truth, and nothing but the truth? I
[1:22:13]
do. Go ahead. Good morning. My name is
[1:22:16]
Brian Davern. I'm a resident of South Kelso.
[1:22:21]
I first visited the Clammer River and John
[1:22:26]
Anderson's property in 1970 and have been a
[1:22:32]
frequent visitor since, mainly for angling purposes, but
[1:22:39]
more more recently for volunteer purposes. I have
[1:22:47]
two objections to this development. One concerns the
[1:22:55]
act of developing it and the threat to
[1:22:59]
the water quality that the hatchery directly downstream
[1:23:04]
will experience. I also have a concern about
[1:23:12]
how the property has been used in the
[1:23:16]
fifty five years that I'm aware of. John
[1:23:21]
would welcome a small handful of anglers each
[1:23:27]
day onto his property when the parking spots
[1:23:31]
were filled, that's all that would be there.
[1:23:34]
So his family use of the property and
[1:23:40]
a few anglers is what that stretch of
[1:23:43]
the river has experienced. What's proposed is nothing
[1:23:48]
like that. And and so the either seasonal
[1:23:58]
or year round potential activity for a stretch
[1:24:04]
of the river that has been quiet will
[1:24:10]
be upset and the the management work of
[1:24:16]
Wild Spring Chinook and Wild Steelhead has been
[1:24:22]
a particular management effort that I think would
[1:24:27]
be impacted. Those are my concerns and thank
[1:24:33]
you for hearing the testimony. Thank you Mr.
[1:24:36]
Dever. Next I have Brad Ruser. I hope
[1:24:54]
I pronounced that. Yeah, it's pronounced Reiser, but
[1:24:57]
you're right Okay. To I did that a
[1:24:59]
lot. That German double vowel thing going on.
[1:25:01]
Mr. Reiser, let's have you sworn, do you
[1:25:05]
swear or affirm to tell the truth, the
[1:25:06]
whole truth and nothing but the truth? I
[1:25:08]
do. Go ahead. A lot of my topics
[1:25:10]
have already been addressed so far, but my
[1:25:13]
concern up there, again, I'm glad we have
[1:25:15]
somebody here from Fish and Wildlife here. The
[1:25:19]
one issue we're looking at here, yes, there's
[1:25:20]
gonna be a huge impact on the fish.
[1:25:23]
That hatchery is a lot closer. I mean,
[1:25:26]
was literally right next door. When you put
[1:25:29]
a restriction from people being in that river
[1:25:31]
from March until June, whatever it may have
[1:25:33]
be, let's look at the real world here.
[1:25:36]
You're going to have people up there camping
[1:25:37]
with kids and everything. The reason they are
[1:25:40]
coming up there is to enjoy that river
[1:25:42]
that is right within a footstep of their
[1:25:44]
campsite. You're not gonna keep kids out of
[1:25:48]
that river. You're not gonna keep the public
[1:25:50]
out of that river when they're coming to
[1:25:52]
a place to camp and they're surrounded by
[1:25:54]
a river, they're going to use that river
[1:25:55]
at all times. There's not going to be
[1:25:58]
anybody there monitoring who goes in the water
[1:26:00]
who does not. There's a big concern of
[1:26:03]
mine right there I fish all that river.
[1:26:05]
I've been up there for thirty five years
[1:26:07]
as most of these people behind me have
[1:26:09]
been there for a long time. You know,
[1:26:12]
I remember the days when, you know, John
[1:26:14]
Anderson, LC Anderson, the owners of that property,
[1:26:17]
there's a frequent herd of elk that live
[1:26:19]
in there right now, and they cross between
[1:26:20]
that property and our property on Greenwood Road.
[1:26:23]
Are directly above that most of residents here
[1:26:26]
are in that area, and those elk live
[1:26:28]
there. They go back and forth. They did
[1:26:30]
not leave that area. Ellen Bodderoff, Jeff is
[1:26:33]
here, his son. Before that, he was raising
[1:26:35]
baby deer up there on that property with
[1:26:37]
John Anderson. He would take them in from
[1:26:39]
fish and wildlife when they were injured, and
[1:26:41]
he would raise them. The deer frequent that
[1:26:43]
property regular. They know that is their safe
[1:26:46]
place. So with those environmental issues that has
[1:26:49]
me concerned. Next thing I'd like to talk
[1:26:51]
about is the danger. That property there was
[1:26:55]
planted in timber by Ellen john is probably
[1:26:57]
three thousand thirty five year growth on the
[1:26:59]
timber directly on that property from there that
[1:27:02]
timber goes directly up the hill. And up
[1:27:05]
the top that hill we get winds every
[1:27:06]
day fifteen twenty miles an hour coming over
[1:27:08]
the top of that Hill and we are
[1:27:09]
surrounded by warehouse or property. If a fire
[1:27:12]
should start in that area, there's no getting
[1:27:14]
out of there, it's a one way road,
[1:27:16]
and 90% of the time the gates that
[1:27:19]
will allow access out of there are closed
[1:27:21]
by a warehouse or they are only open
[1:27:23]
during a need for an emergency such as
[1:27:26]
landslides and such. So there's no way for
[1:27:29]
people to get out of there. Have had
[1:27:31]
smoke up there blowing through our property with
[1:27:33]
smoke and ashes so thick we can't see
[1:27:34]
the other side of our property. And Gifford
[1:27:37]
Pinchop, you do your homework, there's fires up
[1:27:39]
there constantly, and we are in that area,
[1:27:42]
what happens if one starts along the river
[1:27:44]
with the winds coming up to Klamath Canyon,
[1:27:46]
we're all going to be in trouble. The
[1:27:48]
other thing I'd like to hit on is
[1:27:50]
that intersection I'm sure it's been brought up
[1:27:51]
several times, but those trucks are coming downhill
[1:27:54]
for over a mile before they hit that
[1:27:57]
intersection there's a steady downhill drop. You're not
[1:28:00]
stopping a log truck as Mr. Grimes has
[1:28:02]
mentioned you're not stopping a log truck. When
[1:28:04]
you come out of that driveway up there
[1:28:06]
is a hairpin turn you're coming out there
[1:28:07]
and you're coming out there slow, there's a
[1:28:09]
blind turn where the log trucks are coming
[1:28:11]
down the Bypass 6000 Warehouse Road that's the
[1:28:14]
only road they are allowed to use are
[1:28:16]
no longer go along the river. So that
[1:28:18]
intersection is a direct impact of not just
[1:28:21]
logging trucks, but all the logging equipment, the
[1:28:23]
crawlers are using everything is coming around that
[1:28:26]
turn of an RV pop, there's no stopping
[1:28:28]
them. And that's not even to mention all
[1:28:31]
the traffic issues we're going to have up
[1:28:33]
and down that road. In the last few
[1:28:35]
years that garbage up there has multiplied and
[1:28:37]
we go down the road every day and
[1:28:39]
we look at the amount of garbage out
[1:28:40]
there there's nobody to clean it up. Garbage
[1:28:43]
is being brought in by the public, and
[1:28:45]
as residents up there a lot of us
[1:28:46]
will go along with garden, we will clean
[1:28:48]
up our area up there but when you
[1:28:49]
see the public coming in and destroying it.
[1:28:52]
This is gonna have a huge impact on
[1:28:54]
what we have up there. And I've been
[1:28:55]
up there for many years and I just
[1:28:57]
don't want you to I'm used to sitting
[1:28:58]
on my deck and listening to the waterfall
[1:29:01]
at the hatchery directly below me. I'm not
[1:29:03]
gonna sit on my deck and listen to
[1:29:04]
a bunch of campers. I mean, I mean,
[1:29:06]
you know, if I have to, but still,
[1:29:08]
why are we destroying what we have up
[1:29:10]
there, both environmentally and safety? And that's all
[1:29:14]
I have. Thank you. Thank you. Scott Ball?
[1:29:22]
Okay, we're back to the five minute club.
[1:29:29]
Go ahead. Both of my points have been
[1:29:31]
touched. So Ms. Boddart, why don't you come
[1:29:34]
forward? Okay. Thank you, Mr. Michelle. Meyer? I've
[1:29:43]
been on the river over sixty years up
[1:29:47]
there. Again, lot of the stuff was touched
[1:29:56]
but that river was changed back in the
[1:30:01]
nineties, I believe. And I would like, I
[1:30:05]
looked for the date when it was changed,
[1:30:07]
but that's when they quit letting the hatchery
[1:30:12]
fish on the Upper River. And the reason
[1:30:17]
for that was to build a wild Steelhead
[1:30:21]
sanctuary. Mr. Examiner, did you need to swear
[1:30:28]
me in? I sure did. Somehow I had
[1:30:34]
thought we had taken care of that, but
[1:30:35]
thank you. Mr. Bauter, let's have you sworn,
[1:30:38]
do you swear or affirm to tell the
[1:30:40]
truth, the whole truth and that's I do.
[1:30:42]
Thank you. And so, you know, it's where
[1:30:47]
we came from. I grew up up there
[1:30:50]
and that river was flooded with people back
[1:30:53]
then because it was hotter fish and the,
[1:30:58]
you know, the use was just too much
[1:31:01]
for the river to handle for the wild
[1:31:05]
steelhead to benefit. And so that was changed
[1:31:09]
and there's a date associated with that. And
[1:31:15]
the next thing is, you know, I've been
[1:31:17]
on that river my whole life. I floated
[1:31:21]
to that farm to work and interacted on
[1:31:24]
that farm for fifty years. And so I
[1:31:27]
know every piece of it better than anyone.
[1:31:31]
And as my later years, I've been down
[1:31:34]
the river a few times and if on
[1:31:39]
your map here, on that upper shoreline, it's
[1:31:44]
a straight line. That's not a natural river.
[1:31:47]
And I'm not sure who the owner was,
[1:31:52]
but that shoreline has been changed. And we're
[1:31:57]
talking single digit years since it was changed.
[1:32:03]
And I never ever seen a permit out
[1:32:06]
there nowhere. On the Upper Road, down by
[1:32:09]
the Lower Road, again I'm all of a
[1:32:13]
sudden when I went down the river, it
[1:32:15]
was there one day. And that's a recent
[1:32:20]
thing. And it may not mean anything to
[1:32:23]
people that haven't lived and breathed out there,
[1:32:26]
but that flooding in the spring supported wetlands
[1:32:30]
on the lower end. I mean, you get
[1:32:33]
wood ducks in there and you know, they
[1:32:36]
find refuge in there because the predators out
[1:32:40]
on the mainstream. And that's just how nature
[1:32:45]
works and that's been eliminated. And so if
[1:32:50]
we're talking shoreline permit, shoreline this, shoreline that,
[1:32:54]
it's already, that property's already showing a total
[1:32:59]
disregard for the environment. In my book, you
[1:33:04]
know, when you go down a scenic natural
[1:33:08]
river, you expect to see that. You don't
[1:33:11]
expect to see giant riffraff piled up in
[1:33:15]
an even line along the bank, which they
[1:33:18]
had to have an excavator in the river
[1:33:20]
to accomplish that. It's been changed, look at
[1:33:23]
your maps. And then some notes I took
[1:33:31]
while you're talking rules. What's your reporting process?
[1:33:38]
Is the person that's managing it qualified? Is
[1:33:42]
it an in house only and is there
[1:33:45]
required documentation of any of the stuff that's
[1:33:50]
going on down there? And then another concern
[1:33:56]
of mine is cold water drownings. Rivers are
[1:34:01]
magnets. You're gonna I graduated on 06/02/1978 and
[1:34:11]
Mike Sager classmate drowned on June 3 next
[1:34:14]
day. He was a super athlete. He drowned
[1:34:19]
in the Clima River. He swam the middle
[1:34:21]
and cramped up. It was a 100 degree
[1:34:23]
day in June, snow melt. Went right to
[1:34:27]
the bottom. So that is one of the
[1:34:31]
saddest days of my life. And, you know,
[1:34:37]
that's that's pretty much just it. But a
[1:34:40]
real thing to me is where where we
[1:34:43]
came from, why was that section of river
[1:34:46]
changed, and where are we going? What brought
[1:34:50]
it to their attention back then? Is that
[1:34:53]
gone? Does it not matter? You know? Thank
[1:35:00]
you. Thank you. We'll come back to Mr.
[1:35:06]
Wall. Good morning. Let's have you sworn. Do
[1:35:16]
you swear or affirm to tell the truth,
[1:35:18]
whole truth, and nothing but the truth? I
[1:35:19]
do. Go ahead. So I do have some
[1:35:22]
written comments that I wanna get to in
[1:35:24]
just a second. I wanna tell you I
[1:35:27]
appreciate I wanna get my thoughts out. I
[1:35:30]
appreciate what you've covered today because about that
[1:35:33]
200 page staff report, probably a 100 was
[1:35:36]
my I I I wrote those a lot
[1:35:38]
of those comments. And your name is notable
[1:35:41]
in many of the documents. And I'm not
[1:35:43]
an attorney. I'm not an engineer, but I
[1:35:45]
can do research. And I may be right,
[1:35:48]
wrong, whatever on my comments. But I my
[1:35:50]
wife and I own the property between the
[1:35:52]
hatchery and the proposed project. So I live
[1:35:54]
that river every day. We purchased it from
[1:35:57]
John Anderson's son, the gentleman that several people
[1:36:00]
have talked to. He when we bought the
[1:36:02]
property from him six years ago, he spent
[1:36:05]
two hours walking with my wife and said,
[1:36:07]
I'll sell it to you only because you
[1:36:08]
guys understand what this river is all about.
[1:36:11]
He wasn't going to sell it just to
[1:36:12]
anybody, but we felt we felt very lucky
[1:36:14]
to have it. Now we've lived in Cowlitz
[1:36:16]
County for almost thirty years, but not on
[1:36:17]
the river. So I do want to go
[1:36:19]
through some my prepared comments and that's why
[1:36:22]
it's going go longer, maybe five minutes. But
[1:36:24]
I do wanna say one more thing because
[1:36:25]
I'm not sure it's gonna come out of
[1:36:26]
here. The biggest benefit from this hearing that
[1:36:29]
I've had so heard so far is the
[1:36:31]
thing that has been missed to this point.
[1:36:33]
And no offense to the county. These two
[1:36:35]
gentlemen have been so polite and so good,
[1:36:38]
Mr. Adam and Cody, because I've sent lots
[1:36:42]
of messages. They've never done anything but respect
[1:36:44]
to me. And I appreciate the engineering reports.
[1:36:47]
I'm sure they're right. But the point that's
[1:36:51]
being missed that I feel like you're accentuating
[1:36:53]
is that we're looking at these slices of
[1:36:55]
a pie. We're looking at the salt, the
[1:36:57]
ingredients of the pie, but no one's looking
[1:36:58]
at the whole picture. It's a cumulative effect
[1:37:00]
of this whole thing that is impacting this
[1:37:02]
area. It's these people. It's a wildlife. And
[1:37:05]
when you start saying, we're going to put
[1:37:07]
five more feet of pavement and we've met
[1:37:08]
this code. Great. You know, we're going put
[1:37:11]
a septic tank in here and it's going
[1:37:12]
to meet that great. Well, septic when it
[1:37:14]
runs off is going to run down to
[1:37:15]
the end of the field where if anybody
[1:37:17]
goes out there and looks right now it's
[1:37:19]
falling off this last year it's falling up
[1:37:21]
and coming to my property. Bainbridge it's running
[1:37:23]
through the field and going down there they've
[1:37:25]
got trails that are going through the wetland
[1:37:27]
right up to my property. Bainbridge What why
[1:37:29]
aren't we talking about that No one seems
[1:37:32]
to be looking big picture, but I appreciate
[1:37:34]
the questions that you've asked because at a
[1:37:36]
very minimum, it feels like you are doing
[1:37:38]
that. I appreciate that. Not worth anything, but
[1:37:41]
worth it to me and my family. So
[1:37:45]
I would like to read my comments. And
[1:37:47]
I wanna take a little different approach. I'm
[1:37:49]
not gonna rehash everything that I sent in
[1:37:51]
the hundreds of pages. So there is a
[1:37:52]
little different view here. As I said, my
[1:37:55]
And and mister Wall, are you gonna be
[1:37:56]
reading from that? Yeah. And I'll leave this
[1:37:58]
with you. Great. Yeah. I'll try to slow
[1:38:00]
down a little bit. I do tend to
[1:38:01]
talk a little fast. So, like I said,
[1:38:04]
my wife and I live at 4307 Clam
[1:38:06]
River Road, between the hatchery and the property
[1:38:08]
that's being proposed for this project. We chose
[1:38:12]
this place for its peace in its river.
[1:38:14]
We pay our taxes and maintain our property
[1:38:16]
with expectation that the county will also act
[1:38:19]
as a steward for the residents who already
[1:38:20]
live here, not just commercial applicant. It's not
[1:38:23]
a simple land use decision as we've seen
[1:38:24]
here today. It's a clear choice between upholding
[1:38:27]
the duty of the county to protect existing
[1:38:28]
rights and improving a project that will cause
[1:38:30]
irreversible harm. I've already submitted detailed comments highlighting
[1:38:35]
what I view as deficiency in the review
[1:38:36]
to date, including the failure to assess the
[1:38:39]
cumulative impacts as required by the law and
[1:38:41]
misleading guidance provided by the county related to
[1:38:44]
the appeal process. So I'm not gonna go
[1:38:45]
into those again. And I said, I appreciate
[1:38:49]
you having reviewed those in your assessment. This
[1:38:52]
project's the wrong project at the wrong time
[1:38:54]
and the reviews been far too thin, relying
[1:38:57]
on the applicant page studies and avoiding hard
[1:38:59]
questions with specific details. For example, the traffic
[1:39:03]
report. The photos are in the traffic report.
[1:39:05]
Don't show the intersection. They're all looking downstream.
[1:39:07]
They're not looking at the problem that's there.
[1:39:09]
They're looking away from it. Staff reports characterization
[1:39:12]
of this as a relatively small is a
[1:39:14]
direct contradiction of reality. And relatively small, I
[1:39:17]
get what relatively means, but relative to what's
[1:39:19]
there now, this is monumental. This is a
[1:39:21]
city. There's nothing like that there. So calling
[1:39:23]
this relatively small and then applying the filters
[1:39:26]
of what relatively small means is wrong. 37
[1:39:29]
sites, many of them essentially permanent with the
[1:39:32]
geodomes and the drop structures. Calmins, hosting easily
[1:39:36]
thousands of visitors annually, it's not hard to
[1:39:38]
do the math to get there. 37 campsites,
[1:39:41]
couple people fifty two weeks a year, you
[1:39:44]
can get there real easy. Annually is a
[1:39:47]
commercial venture of the scale of a new
[1:39:48]
subdivision without the accountability if we put five
[1:39:51]
houses in there you'd have Homeowners. They're responsible
[1:39:54]
they're taking care of their property You've got
[1:39:56]
thousands of people coming in, but all they
[1:39:57]
want to do is get in there, have
[1:39:58]
a good time and get out. The accountability
[1:40:01]
is not there, and it minimizes the exposes
[1:40:03]
the fundamental flaw in the county's approach to
[1:40:05]
this. So from my standpoint, this would this
[1:40:08]
ultimately results in only one thing that this
[1:40:10]
application should be denied. So the debate on
[1:40:14]
this project ultimately centers on one core legal
[1:40:16]
principle in my opinion, because I can't I
[1:40:19]
can't argue the the environmental impact that I'm
[1:40:22]
that's not my thing I appreciate the fish
[1:40:23]
and wildlife people being here because I thought
[1:40:25]
that's such a huge. Of it, but we're
[1:40:27]
talking about property rights and that's the core
[1:40:30]
of my comment today property rights, not just
[1:40:31]
the right of somebody that can pay to
[1:40:33]
have. Engineering firm put an engineer together legal
[1:40:37]
and go through all the permitting but rights
[1:40:39]
about the people that live there today. Taking
[1:40:41]
their rights away not not diminishing why they
[1:40:44]
moved there not having to do with deal
[1:40:46]
with all the traffic coming up and down.
[1:40:48]
We have amendments in The United States, the
[1:40:50]
fourth and fifteenth that protect these rights in
[1:40:52]
the Washington State Constitution Article one section 16
[1:40:55]
also states that given private property shall not
[1:40:58]
be taken or damaged without just compensation. Term
[1:41:01]
damage is crucial because it means any government
[1:41:03]
action, including land use approval that demonstrably harms
[1:41:06]
the value, safety, livability of a property is
[1:41:08]
a violation of this right. Now I personally,
[1:41:10]
I can't speak on behalf of everybody in
[1:41:12]
here, but I personally say this will harm
[1:41:14]
my property values. It will harm my way
[1:41:16]
of life if this is approved as it
[1:41:18]
stands. Approving this project as a government action
[1:41:21]
will cause direct and measurable harm. It will
[1:41:23]
erode our rights to peace and safety, diminish
[1:41:25]
property values, and permanently alter this unique character
[1:41:27]
of this valley. Transforming a protected community environmentally
[1:41:31]
fragile area into a commercialized and degraded landscape.
[1:41:35]
And I don't have 20 pages here. Have
[1:41:37]
one more, so no. Sorry. The applicant applicant
[1:41:40]
may promise mitigation, but the impacts are so
[1:41:42]
severe and cumulative cumulative that they cannot be
[1:41:44]
mitigated, and the risks are too high for
[1:41:46]
just promises. They represent a fundamental and destructive
[1:41:48]
shift in our community's character. Constant noise, light,
[1:41:51]
and crowds from thousands of visitors will permanently
[1:41:53]
shatter the peace we relied on. There's no
[1:41:55]
fence high enough to contain this impact. The
[1:41:58]
access point is a blind intersection, an unsuited
[1:42:00]
rural road is risky for disaster. Hundreds of
[1:42:03]
weekly vehicles, thousands of annual visitors will inevitably
[1:42:06]
lead to collisions and compromise emergency access for
[1:42:09]
every resident in this canyon. This isn't a
[1:42:11]
speculative risk, it's a certainty. The project site
[1:42:14]
is known as a floodplain. Increase in perrier
[1:42:16]
services will exacerbate flooding for downstream neighbors, a
[1:42:19]
risk proven by previous events. Furthermore, the commercial
[1:42:22]
use of wells and septic systems will strain
[1:42:23]
our shelled aquifers, our shared aquifers and risk
[1:42:26]
contaminated drinking water. In the report, I shared
[1:42:29]
some photos from the last time the flood
[1:42:30]
did come through. Every single standing structure that's
[1:42:33]
there today was inundated with at least two
[1:42:35]
to three feet of water. That water all
[1:42:37]
went on downstream, down through my property, to
[1:42:40]
the hatchery, down river. Continuing that and building
[1:42:43]
on that, I don't understand how how that
[1:42:46]
could be approved. Duty of the county is
[1:42:48]
not to find a way to approve this
[1:42:49]
application. Duty is county is to protect the
[1:42:52]
people and the environment served. The duty is
[1:42:54]
to uphold the law. The law requires a
[1:42:56]
substantive review of cumulative impacts under SEPA, not
[1:42:59]
a simple box checking exercise. Duties protect existing
[1:43:02]
property rights. Cannot guarantee commercial privileges to one
[1:43:05]
applicant by taking away the constitutional rights of
[1:43:07]
many other long standing residents. The duty is
[1:43:11]
to be the final barrier to help unavoidable
[1:43:14]
harms to this project cannot be mitigated. The
[1:43:17]
only legal and ethical resource for my opinion
[1:43:19]
is to deny the application as proposed. I'll
[1:43:24]
stop there. Thank you. Okay. Thank you. And
[1:43:26]
if you'll give those comments to the staff
[1:43:29]
so that they can make copies and provide
[1:43:32]
me with one. No offense, guys. You've been
[1:43:36]
great. But I was understood that we had
[1:43:38]
no option to provide anything written. Had I
[1:43:41]
known I could give something, I'd have three
[1:43:43]
more pages here of things. So I do
[1:43:46]
have some other things that I think are
[1:43:47]
very valid. Once I'll I'll come back to
[1:43:51]
that, mister Paul in a slightly request that
[1:43:55]
property, a public records release that was given
[1:43:59]
on Friday last week after the 5PM deadline.
[1:44:03]
I'll come back to that in a somewhat
[1:44:05]
different way. Sorry. So we'll recognize, and I
[1:44:09]
did not take notes because I anticipated Mr.
[1:44:11]
Walls has proceeded testimony. So that becomes exhibit
[1:44:15]
101. And again, if make that available to
[1:44:17]
the county so that I do have that,
[1:44:19]
Mr. Wall, that'd be great. We've gone through
[1:44:22]
the list of those who signed up. Again,
[1:44:25]
that's not in stone. And if there's anyone
[1:44:28]
else, a member of the public who would
[1:44:30]
like to be heard that did not sign
[1:44:31]
up, This is not two rounds, but if
[1:44:36]
there's anyone who didn't have the chance do
[1:44:40]
so, is there anyone who had not been
[1:44:43]
given the opportunity who would like to testify?
[1:44:46]
My record will reflect that there are no
[1:44:48]
takers and I do apologize that I, Mr.
[1:44:51]
Grimes, keep it to one time around, otherwise
[1:44:54]
we sort of again lose a bit of
[1:44:56]
control to our hearing. Now having said that,
[1:45:01]
by rule, the county and the applicant get
[1:45:04]
a chance to respond. Response is an inherent
[1:45:07]
piece of all public hearings. And so if
[1:45:10]
the county has any responses that wish to
[1:45:13]
make either to the applicant's presentation or to
[1:45:16]
the public presentation, Mr. Kreitz, there anything you
[1:45:19]
wish to say in response? Well, I forget
[1:45:38]
that we have this as a hybrid format.
[1:45:41]
Thank you. Is the record reflecting anyone appearing
[1:45:45]
remotely who wishes to be heard? No one
[1:45:49]
has provided any input or request to speak.
[1:45:51]
Okay, thank you. And then now let's make
[1:45:54]
it clear. If you're online and you're attending
[1:45:57]
this hearing, you can unmute at this time,
[1:46:01]
identify yourself and ask to testify and we
[1:46:04]
will recognize you. Just give that a moment.
[1:46:14]
If you're having trouble unmuting, you can use
[1:46:16]
the raise hand or the chat function in
[1:46:19]
Zoom to get our attention. Okay, we do
[1:46:27]
have a few guests online. I don't see
[1:46:29]
anybody unmuting. We have, we know at least
[1:46:33]
one person is online for the applicant. So,
[1:46:37]
at this time, we're asking members of the
[1:46:38]
public who are on the virtual call. You
[1:46:42]
can unmute, identify yourself, and we will recognize
[1:46:45]
you if you'd like to be heard. Okay,
[1:46:47]
see a hand up from beginning with letter
[1:46:50]
A. So, if you're able to unmute on
[1:46:56]
your end, go ahead and I've asked you
[1:47:00]
to unmute on your side. Should be able
[1:47:02]
to speak if you can unmute yourself. Okay.
[1:47:17]
Do you wanna try and Do you have
[1:47:19]
any controls over there? Okay, we've got an
[1:47:28]
accidental, I'm listening in comment. So it appears
[1:47:32]
that the hand raise was accidental. So to
[1:47:38]
break that to a conclose, I think it's
[1:47:39]
fair say that there are no members of
[1:47:42]
the public appearing virtually who do want to
[1:47:44]
be heard, which then gets us back to
[1:47:46]
the opportunity of both the applicant and the
[1:47:49]
county for response. So Mr. Kreitzer, Mr. Trimble,
[1:47:53]
started to ask you if you had any
[1:47:55]
response and then we got interrupted. Is there
[1:47:59]
any county response or rebuttal? Yeah, I believe
[1:48:04]
we can speak to some of the comments
[1:48:07]
made. Let me see first if the applicant
[1:48:11]
team is gonna ask the traffic engineer to
[1:48:13]
speak. We had several comments about traffic. So,
[1:48:17]
think it'd be appropriate to invite Mr. Christopher
[1:48:20]
Clemmau. If you wanna speak to the traffic
[1:48:23]
issue and comments raised, this would be a
[1:48:26]
great time to do that. You can unmute.
[1:48:34]
Chris Klimab. Can you hear me? Yes, I
[1:48:37]
can. So Mr. Klimab, let's have you, the
[1:48:41]
county has proposed your testimony in response to
[1:48:44]
the public comments. So let's first have you
[1:48:47]
sworn. Do you swear or affirm to tell
[1:48:50]
the truth, the whole truth and nothing but
[1:48:52]
the truth? Yes, I do. And so, I
[1:48:58]
don't, this becomes sort of the county's witness
[1:49:01]
at this point. Or I can ask either
[1:49:06]
the county or the applicant if you want
[1:49:09]
to give some direction to Mr. Climao or
[1:49:11]
you would like him to provide narrative and
[1:49:13]
in response to public testimony, how would you
[1:49:16]
like him to present? Chris, if you had
[1:49:24]
taken any comments and had some notes, I
[1:49:27]
would say just start with the first one
[1:49:30]
that you wanted to respond to. Okay, yes.
[1:49:35]
Several kind of observation here is that the
[1:49:40]
transportation analysis that we performed for this project
[1:49:44]
was focused on largely on-site distance at the
[1:49:49]
existing intersection. And I should say that the
[1:49:54]
standard or the requirements from the Cowlitz County
[1:49:58]
code essentially reference it says intersections governed by
[1:50:04]
this section shall provide adequate distance site distance
[1:50:06]
per standard design criteria, which I will point
[1:50:11]
that the standard design criteria is by AASHTO,
[1:50:17]
which is the American Association of State Highway
[1:50:20]
Transportation Officials. But there's two products that they
[1:50:24]
use, which is the green which is that
[1:50:26]
basically they're designed for highways and streets. It's
[1:50:29]
formally or commonly known as Green Book. And
[1:50:32]
it sets site distance kind of requirements that
[1:50:35]
agencies such as the county then adopt as
[1:50:37]
their standard. But even more importantly for roadways
[1:50:42]
such as this which has a lower traffic
[1:50:45]
volume, you use what ASHA refers to as
[1:50:49]
their guidelines for low volume roadways. Distinction here
[1:50:56]
being that while you measure sight distance at
[1:50:59]
the intersection, and there's no denying here that
[1:51:02]
this site access point has some limited, in
[1:51:07]
particular, horizontal clearance because it's on the outside
[1:51:11]
of a horizontal curve, the access is. It
[1:51:16]
is limited due to that. But then the
[1:51:19]
question is from, let's say, a regulatory standpoint,
[1:51:25]
is that an issue? From AASHTO's design guide
[1:51:30]
perspective, low volume roads have a actually have
[1:51:34]
a fairly low threshold criteria. And meaning, unless
[1:51:43]
there is an incident, you know, a documented
[1:51:46]
history of crashes here at this location, it's
[1:51:50]
usually that any changes are unlikely to gonna
[1:51:54]
kind of improve anything. Again, we've looked, okay,
[1:51:59]
so what I should say then is, I
[1:52:02]
mean that's the general AASHTO guidance is that
[1:52:05]
the existing condition can remain unless there's evidence
[1:52:10]
of a site specific crash pattern and or
[1:52:16]
that there's something clearly that this is going
[1:52:19]
to improve and the fact that there isn't
[1:52:21]
here because we went out, we counted not
[1:52:24]
only the traffic, we looked at the speeds,
[1:52:27]
and we measured sight distance. Required of stopping
[1:52:32]
sight distance in both directions is met. Well,
[1:52:35]
intersection sight distance is a little deficient in
[1:52:38]
one direction. Again, that's a desire. Okay. So
[1:52:43]
I should say there's a distinction between stopping
[1:52:45]
and intersection sight distance. Intersection is a desired
[1:52:51]
length. Stopping sight distance is more of a
[1:52:54]
required length. Intersection sight distance is met in
[1:53:01]
in all instances except for one, which is,
[1:53:04]
kind of a left turn from the stop
[1:53:06]
looking to the south, but the stopping sight
[1:53:09]
distance is made is met. So I guess
[1:53:14]
the short answer here is is that all
[1:53:18]
the necessary sight distance requirements are met. The
[1:53:22]
AASHTO guidance is that everything can remain in
[1:53:25]
place unless there's evidence, you know, kind of
[1:53:28]
some site specific crash pattern, which there isn't.
[1:53:33]
Yeah. I I I don't know how to
[1:53:35]
summarize this. I I understand that it's not
[1:53:38]
perfect out there, but the standard is that
[1:53:42]
there's no documented deficiency. So it's it's okay
[1:53:49]
to remain as is. That's what I have
[1:53:53]
to say. Does either the county, the applicant
[1:53:57]
wish to ask any other questions of the
[1:53:59]
witness? We do not, but the county does
[1:54:04]
have another witness as well. Okay. Thank you,
[1:54:07]
Mr. Klimao. And your other witness? Patrick Harbison
[1:54:12]
with Department of Public Works. Where is Mr.
[1:54:28]
I get this. Oh, sorry. Sometimes people are
[1:54:32]
just too close. Good morning, Mr. Arborson. Have
[1:54:36]
you sworn? Do you swear or affirm to
[1:54:38]
tell the truth, the whole truth and nothing
[1:54:39]
but the truth? I do. Go ahead. And
[1:54:42]
again, Patrick Arborson, Cowles County Department of Public
[1:54:45]
Works. In regards to the site distance issue,
[1:54:49]
try to simplify it a little bit for
[1:54:51]
you. All the intersection site doesn't meet requirements.
[1:54:56]
The one that was brought up as insufficient
[1:55:00]
is a stop controlled intersection. That leg has
[1:55:03]
a stop sign on it. And so the
[1:55:07]
site distance pretty much becomes null and void
[1:55:09]
because cars are supposed to stop. The the
[1:55:13]
direction that most was most discussed today regarding
[1:55:18]
the trucks comes down from Greenwood Weyerhaeuser, and
[1:55:22]
that has a sufficient sight distance according to
[1:55:26]
the traffic analysis. Okay. Anything else, Mr. Armisen?
[1:55:40]
The only other thing I'd add is that
[1:55:43]
the current preliminary stormwater proposal does meet Cowlitz
[1:55:47]
County Code sixteen twenty, and final review will
[1:55:50]
be once your decision is rendered and they
[1:55:54]
submit. Okay, let me, let's try that one
[1:56:02]
again. So they presented a preliminary stormwater plan?
[1:56:07]
Yes. That's in the record. Okay. It's the
[1:56:18]
very long report near the end. Right. The
[1:56:20]
one with all the pages and pages and
[1:56:22]
pages of statistics that no one ever looks
[1:56:25]
at. I take offense. Yeah, exactly. So, and
[1:56:33]
again, can you confirm that that is incorporating
[1:56:35]
existing structures into the necessary stormwater management? Correct.
[1:56:40]
Okay. How would you describe its retention and
[1:56:45]
treatment system? They use low impact development techniques
[1:56:49]
to treat and dispose of the water appropriately.
[1:56:57]
Is that on a sheet dispersal type system
[1:57:00]
then? It depends on what the source of
[1:57:03]
it is. They do dispersion for roads and
[1:57:06]
they use splash blocks for some of the
[1:57:08]
roofs, some compost amended vegetated filter strips for
[1:57:12]
other areas. They specifically designed it depending on
[1:57:16]
what is generating the pollution generation. Okay. And
[1:57:21]
at least preliminarily, it meets the county's most
[1:57:26]
recent version of the stormwater manual. Yes. Would
[1:57:47]
wastewater issues be in your strike zone? No.
[1:57:51]
Okay. So for the county, we do have
[1:57:58]
our environmental health manager here who I think
[1:58:01]
can speak generally to requirements that will apply
[1:58:04]
to this and all projects in the county.
[1:58:07]
As opposed to a condition of approval that
[1:58:10]
may be customized. You know, we do have
[1:58:13]
regulations in place that must be met, right?
[1:58:15]
So, we do have our staff here, Andrea
[1:58:18]
Yoho, who can speak to those. And how's
[1:58:23]
your last name spelled? Good morning, Andrea Yoho.
[1:58:27]
Last name is spelled y o h o,
[1:58:29]
Cowlitz County Health and Human Services. Okay. Miss
[1:58:41]
Yoho, let's have you sworn. Do you swear
[1:58:43]
or affirm to tell the truth, the whole
[1:58:44]
truth, and nothing but the truth? I do.
[1:58:46]
Go ahead. So my understanding is that the
[1:58:53]
question at hand is whether or not there
[1:58:55]
be an approved means of septic disposal on-site.
[1:58:58]
Cowlitz County code fifteen forty five requires general
[1:59:01]
sand has general sanitation requirements for any campground
[1:59:04]
or rv park within the county, And those
[1:59:07]
sanitation codes then refer back to WAC 246272A,
[1:59:13]
provide specifications for installation of septic systems based
[1:59:19]
on the number of people that the system
[1:59:22]
would be serving on a routine basis and
[1:59:26]
is dependent on the soil type up at
[1:59:28]
the site to determine the treatment level and
[1:59:31]
what that system, the functions and the parameters
[1:59:34]
of that system would require. Okay. As part
[1:59:39]
of soil type analysis, I assume you would
[1:59:41]
take into consideration floodway, floodplain, and other things
[1:59:48]
impacting soil type? Yes, sir. The WAC requires,
[1:59:51]
there are certain setbacks from the ordinary high
[1:59:54]
watermark. That's a 100 foot setback that the
[1:59:56]
drain field must meet. Setback from which line?
[2:00:02]
The ordinary high watermark. Any setback from the
[2:00:11]
ordinary, I mean from the floodplain? That I
[2:00:15]
believe we would defer to planning on. It's
[2:00:19]
not specified within our WAC. It the design.
[2:00:26]
Well, Which is we're talking about the design.
[2:00:29]
So what I'm trying to get from you
[2:00:33]
is to what extent, let me try this
[2:00:35]
again. Mr. Trimble's point a minute ago was
[2:00:39]
that a number of these issues are hardwired
[2:00:42]
into the county's regulations And therefore they don't
[2:00:47]
need to be dealt with that link because
[2:00:49]
they're already pre dealt with. I'm curious as
[2:00:55]
to wastewater, you're describing to the extent that
[2:01:00]
it's hardwired for regulation, but then you don't
[2:01:04]
have a hardwiring for floodplain in your system.
[2:01:09]
And that's where I'm trying to better understand
[2:01:12]
if you don't deal with it, why would
[2:01:16]
I not deal with it if there isn't
[2:01:19]
some specific regulation providing for it? Again, have,
[2:01:26]
it is declared that part of this is
[2:01:29]
a floodplain. We have the photos of the
[2:01:31]
area inundated with water. We have a design
[2:01:34]
that shows septic drain fields, but does not
[2:01:36]
show the tanks. And apparently those haven't yet
[2:01:41]
been located. I'm trying to figure out as
[2:01:44]
the one deciding whether that's acceptable, why I
[2:01:49]
should find that acceptable? Where are those tanks
[2:01:53]
gonna be? And why should I feel comfortable
[2:01:55]
that they won't become surcharged by stormwater and
[2:02:00]
force their effluent out under hydrostatic pressure? So
[2:02:04]
that's my question. And if you can answer
[2:02:07]
that Ms. Yeoh, great. So how might you
[2:02:09]
answer that question? If I might answer that,
[2:02:12]
Mr. Schadmeyer. 1625, our floodplain management, defers to
[2:02:17]
the septic designer to create the flood resistant
[2:02:21]
or flood proof waste management system. And there
[2:02:24]
exists some guidance documents within the NFIP, the
[2:02:28]
National Flood Insurance Program that FEMA has provided
[2:02:30]
that septic designers may utilize. But the septic
[2:02:34]
designer has to demonstrate with the design that
[2:02:39]
it will meet the standards as identified in
[2:02:41]
our code. That is helpful. But it's hinting
[2:02:45]
that that's not been done yet. Is that
[2:02:49]
a takeaway? At this time, the county hasn't
[2:02:52]
received a proposal for a septic design plan.
[2:02:54]
Therefore, we haven't been able to provide that
[2:02:56]
review. Okay. When a project is simply complying
[2:03:03]
with standards, it's not my business to second
[2:03:07]
guess standard compliance. When a project is being
[2:03:11]
built out of whole cloth and it's not
[2:03:15]
specifically following very direct standards, but is sort
[2:03:17]
of paving its own way because of unique
[2:03:20]
set of circumstances, then I feel a greater
[2:03:23]
obligation that it falls within my purview, unless
[2:03:27]
the staff purview, try this slightly different way.
[2:03:31]
I'm not an expert in engineering issues. I
[2:03:34]
don't claim to be one. And therefore it's
[2:03:37]
really not my job to oversee engineering decisions.
[2:03:42]
But to the extent that discretion is involved
[2:03:44]
in some of this, there should be greater
[2:03:47]
opportunity for first staff review and public review
[2:03:51]
of projects that are being proposed on their
[2:03:55]
own, not simply filling checking boxes on a
[2:04:00]
chart in a code. And that's a bit
[2:04:03]
of my concern here. Again, we show drain
[2:04:06]
fields, but we don't show where tanks are
[2:04:08]
located. It's the tanks, not the drain fields
[2:04:12]
that in this type of situation are the
[2:04:14]
greater concern. And so I'm just, I'm trying
[2:04:18]
to better understand where we are, where we
[2:04:20]
need to be, how do we get from
[2:04:22]
one to the other? And my belief is,
[2:04:25]
and I'll come back to this in a
[2:04:27]
moment, that it's something that I need more
[2:04:29]
information, which then in turn is entitled to
[2:04:31]
be publicly reviewed before I render that decision.
[2:04:34]
So, Long speech, didn't mean that, but Ms.
[2:04:40]
Yoho, anything else about the public health issues
[2:04:43]
that you would like to attend to? I
[2:04:50]
think the only other concern that I've heard
[2:04:55]
addressed today potentially is the potable water source,
[2:04:59]
which the wellhead proposed wellhead on-site would classify
[2:05:03]
as a class A well, and those construction
[2:05:06]
engineering permitting and oversight is seen by the
[2:05:08]
State Department of Health, not the county. Okay.
[2:05:13]
And that classification is based on correspondence that
[2:05:22]
we had with the applicants back in 2021.
[2:05:25]
So if the number of people being served
[2:05:28]
by the well has changed since that point
[2:05:29]
in time, then it might that might change.
[2:05:33]
The classification might be different, but based on
[2:05:36]
my understanding, the well was going to meet
[2:05:39]
the parameters of a Class A. All right.
[2:05:42]
So let's, thank you, because that's important. Let's
[2:05:45]
talk about that. Again, it's important in a
[2:05:48]
number of respects. One of which is, as
[2:05:51]
I was just explaining, it's not my job
[2:05:55]
to decide something when county regulations have already
[2:05:58]
decided it. When the county's regulations have already
[2:06:03]
said, given these criteria, the answer is X.
[2:06:08]
And so it's not my job to make
[2:06:10]
it Y when the county has already made
[2:06:13]
it X. With water, I need to better
[2:06:18]
understand the totality of the consequences of a
[2:06:24]
Class A system as to this project, because
[2:06:27]
I need to figure out where state regulation
[2:06:29]
ends and my decision making begins, or is
[2:06:34]
it simply entirely a state matter? Let me
[2:06:38]
try that one more time. So first it
[2:06:42]
would be helpful, Ms. Yoho, if you could,
[2:06:45]
for everyone's benefit, describe what it means to
[2:06:47]
be a Class A system and what's expected
[2:06:50]
generally of that system, which will help them
[2:06:53]
understand what's already regulated that doesn't need to
[2:06:58]
be regulated again. And then where that regulation
[2:07:03]
may sort of end and what that leaves
[2:07:06]
if anything about the use of that system,
[2:07:09]
that would be a matter of concern under
[2:07:13]
the various standards I'm to apply specifically those
[2:07:17]
standards applicable to a campground site plan. And
[2:07:22]
in that sense, it's one, it's assuring clean,
[2:07:26]
potable water. Two, it's assuring that only the
[2:07:30]
water that's allowed to be withdrawn is utilized.
[2:07:35]
And that that can be easily determined and
[2:07:37]
reported so that compliances can be confirmed. So
[2:07:44]
within the state health department or the Department
[2:07:49]
of Health, which regulates Class A water systems,
[2:07:54]
as a Class A water system, what would
[2:07:57]
be expected of this well? So I think
[2:08:02]
I'm gonna step back just a moment to
[2:08:04]
whether or not it would be classified as
[2:08:07]
a Class A well, which a Class A
[2:08:09]
well is going to be one that serves
[2:08:12]
25 or more people per day more than
[2:08:15]
sixty days a year or is anticipated to
[2:08:17]
do so. Alright. And based on some preliminary
[2:08:23]
conversations that we had had with the applicant,
[2:08:25]
that was our understanding is that it would
[2:08:27]
meet that threshold. Okay. To that, I don't,
[2:08:32]
I have not and do not review the
[2:08:35]
engineering of class A systems. It's not so
[2:08:38]
much the engineering, and I know it's outside
[2:08:43]
your expertise a little bit, I apologize. But
[2:08:48]
to the extent that that requires monitoring and
[2:08:51]
treatment, can you give us a very fundamental
[2:08:55]
sense of what's expected of a Class A
[2:08:56]
system? Class A systems would be required to
[2:09:00]
provide routine monitoring of the water quality testing
[2:09:05]
for, oh, coliform and inorganic analysis of the
[2:09:13]
water based on whatever it is that the
[2:09:16]
state sets. Don't know what those analytes are.
[2:09:23]
I'm sorry, can't report that. The standards themselves
[2:09:26]
aren't so much important as the fact that
[2:09:28]
there is They would require routine monitoring. And
[2:09:31]
that would be through a satellite agency, correct?
[2:09:34]
Yes. And to the extent that you might
[2:09:42]
know, will that monitoring announce the daily use
[2:09:48]
of water? I don't know. Do you know
[2:10:06]
if a Class A would, since it's no
[2:10:10]
longer an exempt well, an exempt well is
[2:10:14]
one again that a private homeowner can enjoy
[2:10:17]
without having to report testing to the state,
[2:10:21]
since it's no longer that exempt well, but
[2:10:24]
instead is regulated under Class A, do you
[2:10:27]
know if it has the same limits on
[2:10:29]
daily volume? I believe that the exemption is
[2:10:34]
authorized by Department of Ecology, and that is
[2:10:38]
based on the water flow, whether or not
[2:10:41]
this would fall under their exemption standards, I
[2:10:43]
can't speak. Okay. So again, when I sometimes
[2:10:47]
try to paraphrase the sense, give you a
[2:10:51]
sense of what I understand and you can
[2:10:53]
tell me where I'm wrong. So Department of
[2:10:55]
Health would regulate the well as a Class
[2:10:58]
A well, but the Department of Ecology would
[2:11:01]
regulate the well as to its allowed withdrawal
[2:11:04]
then, correct? Correct. Okay. Okay. One of the
[2:11:32]
members of the public have noted that there
[2:11:35]
are potential opportunities for large gatherings at the
[2:11:41]
event. It's describing itself as an event center.
[2:11:44]
It's not simply having overnight stays, but it's
[2:11:48]
also proposing an event building and describing itself
[2:11:51]
as an event center. And I'm just curious
[2:11:54]
from the county's health department, what are the
[2:11:57]
regulations imposed on event centers with respect to
[2:12:02]
environmental constraints, primarily water perhaps, septic, for example.
[2:12:10]
This is becoming too big of a question,
[2:12:12]
it's having too many pieces, but in seeking
[2:12:17]
approval as an event center, are there limits
[2:12:20]
on water use? And is there limits on
[2:12:24]
the number of participants because of either water
[2:12:27]
or septic? The septic question is going to
[2:12:33]
be easier for me to answer. Okay. And
[2:12:35]
that would be that the expectation would be
[2:12:37]
that the applicant would disclose to their designer
[2:12:40]
or engineer at the time of designing the
[2:12:43]
system. What the overall uses of the system
[2:12:46]
would be. So, that would be a daily
[2:12:47]
average use as well as perhaps incorporating search
[2:12:51]
capacity for large events and gatherings. So that
[2:12:54]
way that a septic designer or engineer would
[2:12:56]
be able to adequately engineer to accommodate all
[2:13:00]
uses. Okay. So Mr. Harborson, come back for
[2:13:03]
a moment. So reminding all anyone who I
[2:13:20]
call back that you remain under oath. Do
[2:13:23]
you know what the surge capacity is proposed
[2:13:26]
for the preliminary stormwater design for this project?
[2:13:29]
The surge capacity? Yes. We don't deal with
[2:13:33]
surge capacities in stormwater. We deal with Oh,
[2:13:35]
I'm sorry. Did I say stormwater? With in
[2:13:39]
terms of wastewater, do you happen to know
[2:13:41]
or is that outside your Okay, that's not
[2:13:43]
you. Okay, that's you. Okay. In the preliminary
[2:13:48]
wastewater design, do you know if Sorry, it's
[2:13:52]
so easy to get stormwater and wastewater tangled.
[2:13:56]
In the preliminary wastewater design. Do you know
[2:13:59]
what surge capacity is proposed? We haven't received
[2:14:04]
a design at this time, so I don't
[2:14:05]
have a preliminary review to provide. Okay. Once
[2:14:09]
again, do we have a chicken and egg
[2:14:11]
thing? We know, need to know what we're
[2:14:14]
just utilizing in order to regulate it, right?
[2:14:18]
So you don't have, for wastewater management, you
[2:14:22]
don't know how large a use is proposed.
[2:14:25]
I don't know how large a use has
[2:14:27]
been, would be proposed. However, there is within
[2:14:33]
the WAC and the Environmental Protection Agency manual,
[2:14:36]
there are proposed expected design flow rates. So,
[2:14:43]
in the case of designing a septic system
[2:14:46]
for this type of use, what we would
[2:14:48]
expect is that the designer or engineer would
[2:14:51]
refer back to the the flow rates likely
[2:14:54]
within the EPA manual and would base the
[2:14:59]
flow off of the off of the number
[2:15:04]
of visitors that the site would facilitate. Makes
[2:15:09]
sense, but it also would make sense, right,
[2:15:11]
to have a cap on use consistent with
[2:15:17]
the declared use so that you're not reviewing
[2:15:21]
a wastewater system that's designed for 50 users
[2:15:26]
and there might be an event with a
[2:15:27]
100 users, correct? Could you rephrase that for
[2:15:43]
me please? If you're being told by the
[2:15:48]
applicant that the design is based upon an
[2:15:51]
estimated max 50 users, wouldn't I want to
[2:15:56]
impose a limit that doesn't allow an event
[2:15:59]
of greater than 50 individuals so that the
[2:16:03]
use does not exceed the proposed, the system's
[2:16:06]
design. I see. That would certainly be within
[2:16:11]
your discretion. However, a person could also propose
[2:16:15]
for a special event to bring in additional
[2:16:18]
sanitation devices, such as porta potties to help
[2:16:21]
accommodate that additional number of people. Sure, but
[2:16:25]
that would require acknowledging the system alone, that
[2:16:30]
there could not be an event of greater
[2:16:31]
than X people, that if it's to exceed
[2:16:33]
that event or that capacity, then it has
[2:16:36]
to have supplemental wastewater or waste management. Would
[2:16:43]
you agree? Yes. Okay, all right. I'm not
[2:16:48]
trying to direct you in a certain way.
[2:16:50]
I'm just trying to see where we have
[2:16:52]
commonality in our thoughts. Okay. Okay, and those
[2:17:01]
are my questions of Ms. Yoho. Anything else
[2:17:03]
that you wanted to add? No, thank you.
[2:17:06]
Okay, thank you. Mr. Kreitzer, Mr. Trimble, anything
[2:17:12]
else? I was just gonna add that with
[2:17:21]
regard to the fire life safety comments raised,
[2:17:26]
you know, it is similar to, you know,
[2:17:28]
septic and water and that a standard must
[2:17:31]
be met. The international fire code must be
[2:17:34]
met by the applicant through their design. Now,
[2:17:39]
unlike land use process, which might have a
[2:17:41]
conditional approval that's customized, the fire code has
[2:17:45]
various routes to get to approval. The applicant
[2:17:49]
is allowed to choose those routes through their
[2:17:52]
design and plan review process and availability of
[2:17:55]
all the factors such as access, water, emergency
[2:18:00]
services, all those good factors that lead to
[2:18:02]
life safety. So they either will meet the
[2:18:06]
fire code or they won't. It is not
[2:18:09]
an issue that we chose to use a
[2:18:12]
condition of approval for. The condition is they
[2:18:15]
must meet the international fire code. It's already
[2:18:18]
been adopted by the county. So that's not
[2:18:20]
necessarily required to be a condition of approval,
[2:18:23]
but we have the comments of the fire
[2:18:25]
marshal and the fire district indicating that through
[2:18:29]
plan review, they will be required to meet
[2:18:33]
the existing laws. Okay, thank you. Anything else
[2:18:39]
from the county? No. All right, thank you.
[2:18:46]
And Mr. Joelman, any details from the applicant?
[2:18:49]
Yeah, if you So I'll just close out
[2:18:57]
my presentation first by thanking you Mr. Hearing
[2:19:00]
Examiner and members of staff. I thought this
[2:19:05]
was an exceptionally managed meeting and also wanna
[2:19:10]
thank the members of the public. I thought
[2:19:15]
the comments that were submitted were very articulate,
[2:19:18]
very well prepared and followed up. I appreciate
[2:19:22]
the testimony and the professionalism. And we also
[2:19:28]
understand that it is a, that you can
[2:19:31]
hear and sense the passion that people have,
[2:19:34]
especially when it's in their neighborhood and potentially
[2:19:39]
a project where there's gonna be change. But
[2:19:42]
I would wanna say, do feel compelled to
[2:19:44]
defend Mr. Irish here. There was a comment
[2:19:47]
made regarding perhaps this was driven simply by
[2:19:52]
a financial motive. And I can assure you
[2:19:56]
that if that was the case, Mr. Irish
[2:19:59]
would have abandoned this project a long time
[2:20:02]
ago. We have been involved for several years
[2:20:05]
now and I can wholeheartedly and truthfully say
[2:20:10]
this is not, this is something that he's
[2:20:12]
passionate about. He is very passionate about the
[2:20:16]
environment and about being a steward of the
[2:20:18]
environment. And I've known him long enough to
[2:20:21]
say that without any reservation. And also just,
[2:20:27]
like I said, we've heard the comments and
[2:20:30]
we take them seriously. We stand by the
[2:20:37]
professionals that have put together the reports and
[2:20:39]
the science that went in behind the design
[2:20:42]
and also the, even with the county, I
[2:20:45]
mean, there may be a sense that the
[2:20:46]
county just embraced what we had, but there
[2:20:50]
wasn't, that wasn't the case. We've had lots
[2:20:52]
of back and forth and they are, they
[2:20:56]
don't just represent the property owner, they also
[2:20:58]
represent the neighbors as well. And I feel
[2:21:01]
like they've done an exceptional job of following
[2:21:04]
the code and helping us navigate through some
[2:21:08]
of the changes that they requested. And with
[2:21:13]
that, would say that we would just respectfully
[2:21:15]
request that you, Mr. Harry Zammer approve the
[2:21:19]
project with subject to the any conditions that
[2:21:25]
you deem appropriate. And also to, again, say
[2:21:31]
that I'll be available after the meeting if
[2:21:34]
anyone wants to meet with me in person
[2:21:38]
and I can certainly pass along any thoughts
[2:21:41]
to the owner. But with that, I thank
[2:21:45]
you very much. I thank you, Mr. Jolma,
[2:21:48]
and thank you staff, and clearly thank members
[2:21:52]
of the public for being present and participating
[2:21:54]
today. I'm not rendering a decision nor am
[2:21:57]
I starting the clock on rendering the decision.
[2:22:00]
There's some things I need to receive in
[2:22:03]
order to have a fuller understanding of this
[2:22:05]
project, which will in turn allow some level
[2:22:09]
of additional public comment, kind of getting back
[2:22:11]
to one of Mr. Wall's comments. So some
[2:22:15]
of these things are for my benefit, but
[2:22:17]
they also deserve further public review before they
[2:22:20]
come back to me for hearing. So they
[2:22:22]
really fall into three categories, things I need
[2:22:25]
from the applicant, things I need from the
[2:22:28]
county and some things I need, I think
[2:22:30]
from the fire district. So as to the
[2:22:33]
applicant, I need a set of proposed rules
[2:22:35]
that intended tends to apply to the resort
[2:22:40]
if approved so that I could review those
[2:22:43]
and determine their completeness and their adequacy relative
[2:22:47]
to the requirement of the county's campground rule
[2:22:52]
that the project be compatible with all surrounding
[2:22:54]
uses. From the fire district, I would ask
[2:22:58]
the county to request to the fire district
[2:23:01]
its response to whether one, it would recommend
[2:23:06]
any on-site firefighting equipment in the form of
[2:23:12]
say a water reservoir. And if so, the
[2:23:16]
capacity of that reservoir and its capability in
[2:23:19]
terms of delivery. And so whether or not
[2:23:22]
the district would recommend that such a reservoir
[2:23:27]
be on-site? And if so, in what way
[2:23:30]
would it be utilized? And then I would
[2:23:33]
also recommend any other comments the district may
[2:23:36]
have as to an emergency plan for the
[2:23:41]
exiting of this facility in the event of
[2:23:44]
an emergency or the dealing with an emergency
[2:23:46]
in general. That really needs to come from
[2:23:50]
the district, which is a third party to
[2:23:53]
this process. And then of the county, there
[2:23:57]
are a couple of things that I would
[2:24:00]
like to see. I would like to see
[2:24:05]
from the health department confirmation that it will
[2:24:08]
regard this project as requiring a Class A
[2:24:11]
water system. I need to know if in
[2:24:14]
fact those standards will be applied so that
[2:24:17]
I can then determine whether by applying those
[2:24:20]
standards, that water adequacy and water safety are
[2:24:25]
fully met. And then I also need to
[2:24:28]
see a preliminary wastewater design to see not
[2:24:33]
only again, how it's dealing with the implementation
[2:24:36]
within a sensitive area, but secondly, what its
[2:24:40]
design capacity is and is its design capacity
[2:24:45]
consistent with the proposed size of use of
[2:24:48]
this property? Are we meshing with our different
[2:24:52]
regulations such that whatever we're saying, we're designing
[2:24:58]
environmentally is consistent with the size of the
[2:25:00]
crowd that might attend an event here. So
[2:25:04]
I need to see those things in order
[2:25:07]
to have a fuller and complete picture of
[2:25:09]
this project. And the question becomes the amount
[2:25:13]
of time needed to gather those things, because
[2:25:17]
I would then want to have a probably
[2:25:21]
ten day public response period once the deadline
[2:25:25]
for that, and then a follow-up hearing once
[2:25:28]
the public response period has expired. So I'll
[2:25:34]
turn to the county. Need its thoughts on
[2:25:37]
how long some of these things might take.
[2:25:40]
If I was to continue hold out a
[2:25:43]
deadline for submitting these things four weeks, six
[2:25:46]
weeks, Is that adequate enough? Does the county
[2:25:52]
have something else in mind as to length
[2:25:55]
of time that it may be needed to
[2:25:57]
gain not only what it has produced, but
[2:25:59]
what it needs to get from the fire
[2:26:01]
district? Mr. Kreitz or Mr. Trimble, I look
[2:26:06]
for your suggestions. Yeah, if we could just
[2:26:09]
have a minute to confer with the applicant.
[2:26:11]
You're entirely entitled to that. All right, Mr.
[2:28:20]
Schadmeyer, I believe we have conferred with the
[2:28:22]
applicant. We would settle on six or seven
[2:28:26]
weeks. Okay, let's say seven weeks deadline for
[2:28:31]
the production materials that I've requested. Seven weeks
[2:28:39]
from today, does someone have a ready calendar?
[2:29:06]
The week of October 27 maybe? Specific to
[2:29:12]
Monday would be what? The twenty seventh is
[2:29:21]
a Monday. I'm gonna set it for the
[2:29:24]
previous Friday just so we're not having an
[2:29:27]
unusual break date. Not Friday though. Yes, I'll
[2:29:31]
set a deadline of previous Friday, the twenty
[2:29:34]
fourth for the presentation materials. I'll allow public
[2:29:40]
comment for two weeks following that. And then
[2:29:46]
I'm not setting a hearing, a rehearing date
[2:29:49]
yet. I'll need to confirm with my calendar.
[2:29:51]
I'll have my assistant get back to the
[2:29:54]
county so that it can then announce publicly
[2:29:56]
the rehearing date shortly thereafter, shortly after the
[2:30:01]
two week response with some opportunity beyond it
[2:30:04]
for both the applicant and the county to
[2:30:06]
respond to the comment so that you're not
[2:30:09]
being blindsided at the hearing. So I hope
[2:30:12]
that's understandable, but I do want to again,
[2:30:19]
allow full opportunity of all these issues and
[2:30:21]
the opportunity for the public to respond. There
[2:30:24]
will be the opportunity for public testimony at
[2:30:26]
the hearing itself on these issues, not on
[2:30:29]
new issues, but on the issues in which
[2:30:31]
I'm requesting additional information. And so again, once
[2:30:37]
those materials have been provided, the public can
[2:30:40]
respond to the materials, not reopening the door
[2:30:42]
to other issues, but to those that I've
[2:30:45]
sought additional information for, and then we'll also
[2:30:49]
allow for a return to the hearing at
[2:30:51]
that time, which once that takes place, then
[2:30:54]
the clock starts on my rendering a decision.
[2:30:57]
I hope that's understandable to all the parties.
[2:31:00]
If the county has any questions, they can
[2:31:02]
get back to my assistant. And again, if
[2:31:05]
the public has any that can contact the
[2:31:07]
county to discuss, there's no direct contact with
[2:31:11]
me through that process. I do not speak
[2:31:13]
to any of the parties, including the county
[2:31:16]
as to an ongoing hearing once it's underway,
[2:31:20]
But there are those avenues for clarifying any
[2:31:23]
procedural questions, housekeeping questions about that. I wanna
[2:31:26]
thank everybody for well spoken, articulate, thoughtful comments
[2:31:31]
today. These are extremely important. I've taken copious
[2:31:34]
notes of all testimony. And again, we'll rely
[2:31:40]
upon these comments or this testimony is part
[2:31:42]
of my ultimate decision once I have everything
[2:31:46]
to be thinking about. Mr. Kreitzer, any last
[2:31:49]
things from the county's standpoint? None. Okay, Mr.
[2:31:53]
Joelma, any last things? All right, thank you.
[2:31:55]
And we are adjourned. Thanks.