Where you going?
>> Good afternoon everyone and welcome to
[0:05]
our special council meeting of Tuesday,
August 25th, 2026. I will now call the
[0:09]
meeting to order and acknowledge that we
are in Migmagi, the ancestral and seated
[0:14]
territory of the Migmagi people.
Uh administrative and procedural issues
[0:18]
for today, 2.1 is approval of the
agenda. The recommended motion is that
[0:22]
the agenda be approved as presented. If
we could use our raise our hands for
[0:26]
today, um moved by Councillor Lockhart,
seconded by Deputy Mayor Ghoul. All
[0:30]
those in favor, raise your hand.
[0:34]
Motion's carried. Thank you very much.
Um 2.2, uh I will direct your attention
[0:39]
to the municipal conflict of interest
act and uh requ- as you were required to
[0:44]
declare conflict of interest prior to
any discussion on the matter.
[0:48]
Three, organizational policy and bylaw
items. 3.1 is first reading of the bylaw
[0:53]
to amend the LUB 26-11,
temporary pause on accepting AI data
[0:59]
center development permit applications.
Mr. Harid, I'll give you the floor.
[1:04]
» Thank you, Your Worship. Um
the actual uh item for for council's um
[1:10]
consideration is is pretty brief. I I
just want to take a
[1:13]
couple of minutes though to uh
reiterate, explain, and emphasize the
[1:18]
reason for today's meeting and and the
reasoning behind it being a virtual
[1:22]
meeting and um the the the time that was
the selected. Um because there are lots
[1:28]
of conversations out there, even some of
amongst um members of council about um
[1:33]
exactly what we're doing and I think
it's important that members of the
[1:36]
public understand that, too. So, today
um is the very first uh meeting Today's
[1:41]
meeting is very first in the process of
council uh considering putting
[1:45]
regulations in place to uh specific to
AI data centers.
[1:50]
The only purpose of the bylaw amendment
that's before you today is to implement
[1:54]
a pause for 6 months for receiving and
processing
[1:58]
uh at potential applications for
development permits related to these
[2:01]
facilities while staff and the
consultants who are working on our
[2:04]
comprehensive, mind you, bylaw and
municipal planning strategy review
[2:09]
uh do the work they need to bring these
um regulations forward.
[2:15]
Um
as most of you know, as folks on council
[2:19]
would know and and perhaps members of
the public don't, um the process today
[2:24]
after first reading, uh there will be a
if if council is so inclined to approve
[2:29]
the motion that's before you, the um
uh first reading and notice of intent
[2:34]
will be approved and then we'll proceed
to schedule public hearing uh in the
[2:38]
council chambers in Upper Tantallon
sometime in September where members of
[2:42]
the public will be welcomed to come and
um
[2:46]
um take part in the public hearing and
uh provide and share their
[2:51]
um their opinions and their concerns um
with council and members of the public.
[2:57]
After that public hearing, um there
would be a a
[3:02]
another period of a few days or a few
weeks and council would then consider
[3:07]
second reading of the bylaw. If that
second reading were approved, then um
[3:13]
the moratorium would be in place.
The pause on accepting applications,
[3:18]
which is a moratorium, would be in place
uh for 6 months while this
[3:24]
work goes on in the background.
After today's first reading, if council
[3:29]
approves first reading today,
um we will staff of the municipality
[3:33]
will be precluded from accepting and
processing any um applications for
[3:39]
development permit relative to these
sorts of facilities.
[3:43]
Hopefully those comments give folks some
comfort in terms of what's going on and
[3:47]
what process is.
Today is just about the pause, just
[3:52]
about the moratorium.
There is more work to do and it will be
[3:55]
ongoing as part of the larger review
that's been going on now for about a
[3:59]
year.
Um
[4:02]
and when those regulations come forward
as part of the bigger package, again,
[4:08]
there will be a separate process where
there will be a first reading like
[4:11]
today, although it will take much, much
longer because it'll be a much larger
[4:14]
document.
Um
[4:18]
those documents will be available to the
public. There will be another public
[4:22]
hearing, um
at least one, um for folks to be able to
[4:26]
express their opinions and understand
the issues. And then council again, um
[4:31]
will go through second reading and and
um
[4:36]
final final approval.
[4:41]
Um
we're putting a 6-month we're proposing
[4:44]
to put a 6-month pause on accepting
these applications.
[4:49]
If the work
the larger the work, the wider work on
[4:52]
the land use bylaw, regulate uh
bylaw and the municipal planning
[4:57]
strategy
for some reason takes longer than 6
[5:01]
months,
council at the time can reconvene and
[5:05]
consider whether another 6-month
extension to this
[5:10]
moratorium or pause is appropriate.
Um our our legal counsel has advised us
[5:17]
that in
in situations like these, that that
[5:20]
process is a reasonable one and and
reasonability is key in
[5:26]
uh ensuring that uh we do this right and
then we do this with all due regard for
[5:31]
uh for process.
Um some conversation about um
[5:39]
having this meeting online rather than
in person. So, two things to say about
[5:44]
that.
This is um
[5:47]
notice of intent first reading. Again,
as I described, there's there two more
[5:51]
steps in this process alone.
This
[5:55]
if it weren't for me talking forever,
this would be an exceedingly uh short
[5:59]
meeting because there's just there's
just one item. So,
[6:02]
the decision was taken to have it
virtually rather than have um
[6:07]
nine members council uh drive in from
from all parts of the municipality for a
[6:12]
20-minute meeting.
Um
[6:14]
that was the first consideration. The
second consideration is one of
[6:18]
timeliness.
Once council, to reiterate, once council
[6:23]
approves first reading, if they do, then
we are precluded from processing these
[6:28]
sorts of applications if they if they
come. So, it was incumbent upon us to
[6:33]
have this meeting as early on the
calendar as we could so that more pages
[6:39]
didn't flip on the calendar and more
opportunities for these sorts of
[6:42]
applications um
to be
[6:46]
received would occur.
[6:50]
Really clearly, though,
I'm just about done.
[6:54]
Really clearly,
um
[6:58]
we at this point are not uh in receipt
of any sorts of um
[7:04]
uh inquiries.
We are not aware um of potential
[7:10]
applications. Our staff are not engaged
with anyone kicking the tires about an
[7:14]
application. This is simply a proactive
action by this council
[7:22]
based on the fact that um there are
concerns in the community about these
[7:26]
sorts of facilities
and um
[7:30]
council wanted to get ahead of ahead of
the issue.
[7:33]
So,
with that as a background,
[7:39]
I don't think I forgot anything. With
that as a background,
[7:42]
uh, the item before you is
a bylaw to amend the land use bylaw.
[7:49]
Uh,
as I stated earlier, members of council
[7:52]
were hearing significant degree of
community-based concern regarding
[7:56]
potential development of AI data
centers.
[7:58]
And, um,
wish to complete the ongoing
[8:02]
comprehensive review of the MPS and LUB
before potentially having to consider
[8:08]
any such application.
So, creating some space and time
[8:14]
um,
to get the regulations in place before
[8:17]
any potential and
applications come forward.
[8:22]
Back in June,
June seems like so long ago.
[8:26]
Back in June, uh,
council directed staff to provide
[8:30]
information on the mechanics of
implementing a moratorium uh, on
[8:34]
accepting applications for AI data
centers.
[8:38]
Uh,
those of us who are those of you, sorry,
[8:40]
I wasn't on council. Those of you who
were on council, um,
[8:44]
the previous council will recall the
process we followed to put in place a
[8:48]
moratorium on wind turbine development
while council considered the setback
[8:53]
requirements and related regulations,
um, relative to wind turbine, um,
[8:58]
development.
This process is very similar, um, to
[9:04]
that process. In fact, it's exactly the
same. Change the names, it's it's
[9:08]
exactly the same.
Now, in terms of any financial
[9:13]
implications to to, um,
uh, making this decision, at this point
[9:18]
there are
there aren't any identified. I suppose
[9:21]
for the sake of completeness, we should
say that,
[9:24]
um, putting the the moratorium or the
pause in place perhaps has a a negative
[9:29]
or potential negative impact on the fine
future revenues. It's undefined, but for
[9:34]
the sake of completeness, we're just,
um,
[9:37]
we're just uh identifying that.
Uh the couple of alternatives, uh
[9:43]
Council, you can proceed with first
reading the attached bylaw, which I'll
[9:47]
read here before we're done. Um
and once the uh first reading has been
[9:52]
given, no development permit may be
issued in the face of the pending
[9:56]
changes. That's number one, and that's
the recommended solution, so that's what
[10:00]
staff are recommending.
Um alternatively, you could allow the
[10:04]
MPS and LUB to be reviewed to proceed
without enacting a short-term
[10:07]
moratorium. Uh planning staff do
indicate that they believe that the MPS
[10:12]
and LUB presently
uh likely don't permit the issue of
[10:16]
development permit, um but that's not a
that's not a a known quantity. Uh
[10:21]
Council could allow that development
proceed within the existing
[10:25]
um provisions of the LUB.
Um as I said, the recommended the
[10:29]
recommended um
action is to
[10:35]
pass first reading the bylaw. The bylaw
is at page seven of your of your Council
[10:39]
package,
um for those of you who are following,
[10:42]
and it's a very short
uh two-paragraph bylaw bylaw 2611, and
[10:47]
bylaw to amend the land use bylaw. First
line is it's just it's just the title,
[10:52]
and then the the the citation. The
second is the actual meat of it. For a
[10:56]
period of six months commencing on
Council approving first reading of the
[11:00]
bylaw, no development permit
applications will be received for AI
[11:03]
data centers while the municipality
completes its comprehensive review of
[11:08]
the municipal planning strategy and land
use bylaw.
[11:10]
Upon motion by Council where additional
time is deemed necessary to complete the
[11:14]
review, this review period may be
expended extended one time by a further
[11:19]
period of up to six months, and any
applications received following the
[11:23]
expiry of the review period would be
shall be processed in accordance with
[11:28]
the requirements in force at the time.
It's important
[11:33]
um to realize or to understand that the
process
[11:38]
um has to be reasonable. It has to stand
that test of reasonableness.
[11:42]
Um
[11:45]
approving this bylaw at first and second
reading
[11:51]
does not
prohibit forever
[11:55]
the development or the developer issuing
development permits for AI data centers.
[11:59]
Rather, it provides time and gives pause
to the to those that activity to give
[12:05]
council and staff the opportunity to
develop um
[12:09]
the regulations.
All of those processes are subject to
[12:14]
public input. They'll be done in a
public forum.
[12:19]
There will be public hearings, but this
one is simply about the pause.
[12:25]
So, the motion, Your Worship, that is
before council is a very simple one.
[12:31]
And it is that uh that council approve
first reading of bylaw 2611, the bylaw
[12:36]
to amend the land use bylaw, and further
that staff be directed to schedule a
[12:40]
public hearing.
I'm happy to answer or try to answer
[12:44]
any questions that council may have.
>> Thank you very much, Mr. Harris.
[12:49]
Um before I move on to the uh moving of
the motion and whatever, I believe
[12:54]
Councillor Redman uh would like to say
something. So, go ahead, Councillor
[12:57]
Redman.
>> Uh thank you. I just wanted Greg for
[13:01]
taking the time to explain the process.
It's been very confusing for
[13:06]
constituents, and they've been concerned
about us having um a Zoom meeting, and I
[13:13]
think the explanation that the CAO gave
was most appropriate, and I thank him
[13:19]
very much for taking the time to do
that, and hopefully it eases a lot of
[13:23]
minds. Thank you.
>> Thank you very much, Councillor Redman.
[13:27]
» Thank you.
>> The recommended motion is that Council
[13:30]
approve first reading of bylaw 26-11,
the bylaw to amend the land use bylaw.
[13:35]
Further, that staff be directed to
schedule a public hearing. Someone move
[13:38]
this second this to make the motion.
Moved by Councillor Redmond, seconded by
[13:42]
Councillor Hotelling.
Um, any comments or discussion on the
[13:45]
motion?
Go ahead, Councillor Hotelling.
[13:50]
» Thank you, Mayor Gilroy. Um
so I just have a few things to say and
[13:56]
apologies if it seems a little choppy.
Lots of people have been weighing in
[14:00]
this morning, but I did want to share
comments and concerns
[14:04]
um that I have been asked to just to
make sure that it's on the record and
[14:08]
recorded here today.
Uh so, first of all, I just want to say
[14:12]
that I did write this without AI. I was
trying out AI for some time and admit it
[14:17]
can be useful, but there are always
there was always something missing, an
[14:22]
authentic tone that comes from real
humans who are not perfect, and I like
[14:26]
that. It makes me feel more connected to
the work I do, and it makes me actually
[14:31]
use my brain. I am not saying I will
never use it. I just want to be clear
[14:35]
that I am now more than ever paying
close attention to how and why and the
[14:39]
risks associated with it.
It actually feels like we are being
[14:44]
forced into using it. I try my best to
delete the options on all platforms now,
[14:49]
but it keeps popping up. I understand
tech is here and we don't seem to have a
[14:53]
choice in using it if we are going to be
online, but just for the record, I was
[14:57]
okay with Google prior to AI.
I think it may be better to have to take
[15:03]
the time to research properly and
contemplate rather than grabbing a quick
[15:07]
answer that may or not be truthful, and
I make all my posts, business signage,
[15:11]
and content using my own creativity now.
Call me old-fashioned, but I think it
[15:16]
may be best for us as a whole to just
close the computer and and down the
[15:20]
phone and go outside more often. Maybe
then we wouldn't need more data centers.
[15:25]
Could it be that simple?
So, here's some things that constituents
[15:30]
have shared with me.
There is an urgency to this I'm
[15:34]
noticing. I've read things like we need
to be leaders in data center development
[15:38]
and if we get on board early, we'll have
a windfall of tax dollars and jobs.
[15:42]
This rush to sign up leaves little room
for research and data collection on what
[15:47]
the ripple effect will be for our
residents and the environment. I believe
[15:51]
this moratorium should be in place as
long as it takes to make an informed
[15:55]
decision.
Some are comparing Nova Scotia to
[15:59]
Alberta.
Here in Nova Scotia, when you sneeze,
[16:03]
the farmer next over catches your cold.
Everything is too close together to have
[16:08]
space for this type of industry and the
resources it consumes.
[16:12]
There has been a severe lack of water
during summer months in Cumberland. Over
[16:18]
the 20 years I have lived in Pugwash, my
own well has gone dry several times and
[16:23]
I have many residents who have the same
concern.
[16:27]
In places like Ireland and New South
Wales, they require are requiring tech
[16:32]
companies to power their data centers
with renewable energy and to provide
[16:36]
that renewal renewable energy
themselves, adding to the supply.
[16:41]
Government regulations could force tech
companies to provide and pay for
[16:45]
enormous new quantities of renewable
energy.
[16:49]
And I'm talking about actual renewable
energy, not biomass or natural gas, but
[16:54]
perhaps geothermal, which Cumberland has
spent years researching in Springhill.
[16:58]
And part of the regulations for a data
center could be providing a community
[17:02]
with renewable energy as well as their
own.
[17:06]
Some questions. Will council have a
report on impacts to communities that
[17:11]
already have data centers?
Will an application to build a data
[17:15]
center come to council if there is no
moratorium.
[17:19]
Where is all this data being used? Is it
really Canadians who need this much
[17:23]
capacity?
Are we able to find this out, or can we
[17:27]
put something in place that will allow
the data center to only supply data we
[17:31]
need here in Nova Scotia?
Some have cited to me that we need this
[17:36]
because of all our banking services,
etc., that have gone online.
[17:41]
My understanding is that these are
specifically for AI data, but it would
[17:45]
be good to know exactly what that means.
I have been using online banking for
[17:49]
some time, and there was not this urgent
need for data centers. I will do my own
[17:53]
research and find experts who I can ask
without a financial tie to these
[17:57]
projects to get an un- biased opinion.
There are so many questions at this
[18:03]
point that we need to know the answers
to. Perhaps there is a benefit that
[18:07]
outweighs the costs and risks of this,
but I admit I don't know enough about it
[18:11]
yet, and so I will be voting for the
moratorium until we have a better
[18:15]
understanding. Thank you.
[18:19]
» Thank you very much, Councillor
Hotelling. Anyone else have anything to
[18:22]
say?
Raise your hand.
[18:26]
Mr. Herritt, go ahead.
>> I Thank you, Your Worship. I just wanted
[18:30]
to check in to see whether those
questions that Councillor Hotelling
[18:34]
posed were rhetorical or
she was looking for an answer.
[18:39]
» Thank you. Um I don't expect an answer
today. I just wanted to put those in
[18:45]
your
I wanted to plant a seed.
[18:49]
» What So, thank you for that. Yeah, Your
Worship, Councillor Hotelling, um
[18:52]
I would expect that um when regulations
come to council, so those things won't
[18:57]
be part of this proceeding because this
is simply about a pause.
[19:01]
But when the actual regulations come
forward, the changes to the land use
[19:05]
bylaw that address this,
um those are
[19:09]
um
those are reasonable questions to ask uh
[19:13]
of
consultants and our planning staff and
[19:17]
council at the time can work their way
through, you know,
[19:22]
what answers you can get to the to those
um
[19:26]
to those questions. Just but
but really
[19:30]
really quickly I I would
think that
[19:33]
impacts on communities and impacts on um
properties and that are near these
[19:41]
developments are
kind of sort of what the planning
[19:44]
process is all about. So, I I I I would
expect that there would be information
[19:48]
provided on that, counselor.
Um
[19:52]
you had asked, again maybe rhetorically,
uh
[19:56]
uh
without this moratorium, would would
[19:59]
council be would the municipality be
accepting
[20:03]
applications? I think the answer to that
is
[20:07]
yeah, they would work their way through
the process. It doesn't mean they would
[20:12]
necessarily be approved or that they
would be approved as of right or they
[20:16]
would work their way through that
the the process. So,
[20:20]
all of those things are
questions that
[20:24]
members of council and the public can
ask when the actual regulations come
[20:27]
forward.
>> Thank you very much, Mr. Mayor.
[20:31]
Uh Counselor Italian, go ahead.
>> Uh
[20:36]
thank you. Just to be clear, um it was
specifically whether the development
[20:41]
agreement comes to council, if there's
no moratorium, like is it just through
[20:46]
staff or does it come to a council for
approval?
[20:51]
» Right. So, thank
Your Worship, yeah. So, if there's a
[20:55]
development So, if the development is by
development agreement, certainly it does
[21:00]
come to council.
Um
[21:03]
planning staff advised that there, as I
said in my earlier remarks, they believe
[21:08]
that the current land use bylaw,
municipal planning strategy,
[21:11]
probably does not permit
the development of these facilities as
[21:16]
it is currently
uh as it is currently written. I'll
[21:20]
interpret that as it certainly has not
as of right in um
[21:25]
in any zone at this point in time. So,
if that's the case,
[21:28]
that would come before council.
[21:33]
I I just do not foresee
[21:39]
Careful, because I won't be the CAO much
longer, but but I do not foresee
[21:44]
uh staff bring a staff uh an
an approval for an AI data center
[21:50]
happening
anytime soon at the staff level without
[21:56]
council involvement, particularly in the
face of
[22:00]
you know, bringing forward this pause
and and going through the process. So,
[22:04]
even if the pause
today wasn't
[22:09]
um successful.
>> Thank you very much, Mr. Harold. Anyone
[22:13]
else have a comment? Welcome.
[22:16]
Seeing none, I'll ask that we call for
the vote. All those in favor of the
[22:19]
motion, raise your hand.
[22:23]
Contrary minded?
Seeing none, the motion is carried
[22:26]
unanimously. Thank you very much, folks.
And if I could have a motion to adjourn,
[22:31]
that would be good. Moved by Deputy
Mayor Ghoul, we are now adjourned. Thank
[22:35]
you, everyone, for your participation
today and your input. Oh, Councillor
[22:38]