[0:01] [ SOUNDING GAVEL ]
[0:05] >>Michael Sheeley: GOOD
[0:07] AFTERNOON.
[0:07] WELCOME TO THE SEPTEMBER 15
[0:09] MEETING OF THE VILLAGE OF ESTERO
[0:11] PLANNING, ZONING AND DESIGN
[0:13] BOARD.
[0:13] OUR FIRST ITEM OF BUSINESS IS
[0:15] THE PLEDGE OF ALLEGIANCE, IF
[0:18] YOU'D ALL PLEASE JOIN ME IN THE
[0:20] PLEDGE.
[0:21] [PLEDGE OF ALLEGIANCE]
[0:45] >>Kristin Jeannin: HERE.
[0:45] >> JONES IS ABSENT TODAY.
[0:48] >>Al Paivandy: HERE.
[0:49] >>Michael Sheeley: HERE.
[0:50] >>James Tatooles: HERE.
[0:53] >> BOARD MEMBER WALLACE IS
[0:55] ABSENT TODAY.
[0:55] BOARD MEMBER WILLIAMS?
[0:57] CHAIRMAN GARGANO IS ABSENT
[1:00] TODAY.
[1:00] >>Michael Sheeley: THANK YOU.
[1:01] YES, I'M STANDING IN FOR OUR
[1:04] CHAIRMAN TONIGHT.
[1:04] ON THE AGENDA, THE NEXT ITEM IS
[1:06] APPROVAL OF THE AGENDA.
[1:07] WE HAVE A CHANGE TO THE AGENDA.
[1:11] AT THE REQUEST OF THE
[1:13] APPLICANTS.
[1:13] SOMEBODY COULDN'T BE HERE QUITE
[1:15] ON TIME.
[1:16] SO WE ARE GOING IN THE ORDER OF
[1:20] 7A ON THE AGENDA, PUBLIC
[1:22] INFORMATION MEETING, AND THEN
[1:24] NUMBER 6, AND THEN 7B.
[1:27] JUST SO EVERYBODY KNOWS,
[1:28] TONIGHT, THE BOARD WILL TAKE NO
[1:30] ACTIONS ON ANY CASES.
[1:31] WE'LL HAVE NO VOTES.
[1:33] TONIGHT WE HAVE PUBLIC
[1:34] INFORMATION MEETINGS AND
[1:35] WORKSHOPS.
[1:36] SO THEY ARE ONLY FOR INFORMATION
[1:38] FOR US AND FOR THE PUBLIC.
[1:41] CAN I HAVE A MOTION ON THE
[1:43] AGENDA, PLEASE?
[1:44] >>James Tatooles: I'LL SO MOVE.
[1:46] >>Al Paivandy: SECOND.
[1:46] >>Michael Sheeley: ALL IN FAVOR
[1:48] SAY AYE.
[1:48] OPPOSED, LIKE SIGN.
[1:49] MOTION CARRIES.
[1:50] THE NEXT ITEM IS THE CONSENT
[1:53] AGENDA, WHICH IS THE APPROVAL OF
[1:55] THE PREVIOUS JULY 21st MEETING
[1:57] MINUTES.
[1:58] CAN I HAVE A MOTION FOR THAT,
[2:00] PLEASE?
[2:01] >>Dan Williams: SO MOVED.
[2:02] >>James Tatooles: I'LL SECOND.
[2:04] >>Michael Sheeley: ALL IN FAVOR
[2:06] SAY AYE.
[2:07] OPPOSED, LIKE SIGN.
[2:08] MOTION CARRIES.
[2:09] THE FIRST ITEM TONIGHT WILL BE
[2:13] NUMBER 7, THE PUBLIC INFORMATION
[2:16] MEETING FOR 7A, HOME BASE
[2:19] ESTERO.
[2:19] MICHAEL OR WHO WILL START IT?
[2:25] AYMEE, VERY GOOD.
[2:46] >>Aymee Chavez: GOOD EVENING,
[2:48] BOARD MEMBERS.
[2:49] LIKE MIKE SAID, THE FIRST ITEM
[2:52] ON TONIGHT'S AGENDA IS A PUBLIC
[2:54] INFORMATION MEETING FOR HOME
[2:56] BASE ESTERO.
[2:57] THE APPROXIMATELY TWO-ACRE SITE
[2:58] IS LOCATED AT THE CORNER OF
[3:01] EVERBLADES PARKWAY AND BEN HILL
[3:03] GRIFFIN PARKWAY WITHIN THE
[3:05] SOUTHERN PORTION OF UNIVERSITY
[3:07] HIGHLANDS 2.
[3:08] HOME BASE IS A NATIONAL
[3:10] NONPROFIT ORGANIZATION DEDICATED
[3:11] TO HELPING VETERANS, SERVICE
[3:13] MEMBERS, AND THEIR FAMILIES.
[3:15] THE APPLICANT IS PROPOSING A
[3:18] TWO-STORY APPROXIMATELY 26,000
[3:20] SQUARE FOOT STAND-ALONE VETERANS
[3:22] WELLNESS CENTER ON THE CURRENTLY
[3:25] VACANT SITE.
[3:26] THE APPLICANT HAS NOT YET
[3:29] SUBMITTED A DEVELOPMENT ORDER
[3:31] APPLICATION.
[3:31] HOWEVER, THEY HAVE PREPARED A
[3:33] PowerPoint PRESENTATION FOR
[3:34] TONIGHT THAT PROVIDES BACKGROUND
[3:36] ON THE ORGANIZATION AND AN
[3:38] OVERVIEW OF WHAT THEY ARE
[3:40] PROPOSING FOR THE SITE.
[3:42] PLEASE NOTE THAT BOARD MEMBER
[3:44] JIM WALLACE PROVIDED WRITTEN
[3:46] COMMENTS IN ADVANCE FOR THE
[3:48] MEETING.
[3:49] IF THERE ARE NO QUESTIONS, I'LL
[3:51] TURN IT OVER TO ISABEL WITH
[3:54] SUFFOLK TO BEGIN THE
[3:56] PRESENTATION.
[3:56] >>Michael Sheeley: THANK YOU.
[3:58] >> GOOD EVENING, EVERYBODY.
[3:59] THANK YOU SO MUCH.
[4:00] MY NAME IS ISABELA RAMOS WITH
[4:03] SUFFOLK DESIGN.
[4:04] WE ARE THE PROPOSING ARCHITECT
[4:05] AS PART OF THE PROJECT.
[4:06] ON THE TEAM TODAY, WE HAVE
[4:09] BUYER'S REPRESENTATIVES OF THE
[4:10] PROJECT.
[4:10] >> EXCUSE ME.
[4:11] COULD YOU SPEAK CLOSER TO THE
[4:14] MIKE, PLEASE?
[4:15] >> SORRY ABOUT THAT.
[4:16] WE HAVE A COUPLE OF OTHER
[4:17] MEMBERS OF THE TEAM.
[4:18] WE HAVE AS PART OF HOME BASE, WE
[4:21] HAVE ARMANDO DIAZ WHO WILL BE
[4:22] SPEAKING HERE SHORTLY.
[4:23] HE WILL BE THE END USER FOR THIS
[4:26] PROJECT.
[4:26] WE ALSO HAVE DEAN MARTIN WITH
[4:29] TDM.
[4:29] EASY THE CIVIL ENGINEER ON THE
[4:32] PROJECT.
[4:32] WE HAVE JOSH KELLY.
[4:33] HE IS THE LANDSCAPE ARCHITECT OF
[4:35] THE PROJECT.
[4:35] WITH THAT, WE'LL GO AHEAD AND
[4:40] GET STARTED.
[4:42] A LITTLE BIT OF THE AGENDA FOR
[4:44] TODAY, AS AYMEE NOTED, WE WANTED
[4:46] TO PRESENT A LITTLE BIT MORE
[4:48] ABOUT THE PROJECT, THE MISSION,
[4:50] AND REALLY WHAT THE INTENT FOR
[4:52] THIS BUILDING IS.
[4:53] AS PART OF PROJECT INTRODUCTION,
[4:55] I'LL ASK ARMANDO WITH HOME BASE
[4:57] TO COME AND TALK ABOUT THE
[4:59] ORGANIZATION.
[5:00] >>Michael Sheeley: THANK YOU.
[5:02] >> GOOD AFTERNOON, FOLKS.
[5:04] ARMANDO.
[5:05] I'M THE SENIOR DIRECTOR FOR HOME
[5:08] BASE.
[5:09] HOME BASE IS A
[5:11] NATIONAL NONPROFIT ORGANIZATION
[5:11] COFOUNDED BY THE RED SOX
[5:14] FOUNDATION AND MASSACHUSETTS
[5:15] GENERAL HOSPITAL.
[5:16] WE'RE BASED OUT OF BOSTON BUT
[5:18] HAVE BEEN OPERATING HERE IN
[5:19] SOUTHWEST FLORIDA AND FLORIDA
[5:20] FOR ALMOST 13 YEARS.
[5:22] WE HAVE DEDICATED TO HELPING
[5:23] VETERAN SERVICE MEMBERS AND
[5:25] THEIR FAMILIES WHO ARE ALL THE
[5:27] CLIENTS THAT WE SERVE WITHIN OUR
[5:29] NONPROFIT.
[5:30] WE HELP THEM THROUGH A SERIES OF
[5:32] PROGRAMS.
[5:33] EVERYTHING FROM KIND OF
[5:34] COUNSELING TO HELP DEAL WITH THE
[5:36] INVISIBLE WOUNDS, PHYSICAL
[5:37] FITNESS AND PHYSICAL REHAB TO
[5:39] DEAL WITH THE PHYSICAL WOUNDS
[5:41] THAT VETERANS AND THEIR FAMILY
[5:42] MEMBERS FACE WHEN THEY COME HOME
[5:45] AS WELL AS SOCIAL BASED NEEDS.
[5:47] WE'VE BEEN OPERATING HERE IN
[5:48] SOUTHWEST FLORIDA.
[5:49] THIS IS REALLY KIND OF OUR
[5:50] HEADQUARTERS FOR ALL OF OUR
[5:52] OPERATIONS IN FLORIDA.
[5:52] WE HAVE PROGRAMS HERE.
[5:54] PROGRAMS IN TAMPA, AS WELL AS
[5:56] PROGRAMS ALL ALONG THE
[5:57] PANHANDLE.
[5:57] BUT WE'VE BEEN HERE ABOUT 13
[6:00] YEARS OPERATING IN PARTNERSHIP
[6:01] WITH A LOT OF ORGANIZATIONS THAT
[6:03] YOU'RE FAMILIAR WITH, SUCH AS
[6:05] FLORIDA GULF COAST UNIVERSITY,
[6:07] LEE HEALTH, DAVID LAWRENCE
[6:08] CENTER, TAMPA GENERAL HOSPITAL,
[6:10] FLORIDA DEPARTMENT OF VETERANS
[6:11] AFFAIRS.
[6:12] WE'RE LARGELY PHILANTHROPICALLY
[6:12] FUNDED BUT ALSO DO RECEIVE
[6:14] FUNDING FROM THE STATE OF
[6:16] FLORIDA TO SUPPORT THESE
[6:17] EFFORTS, AND WE'RE SO DEDICATED
[6:19] TO THIS WORK HERE IN FLORIDA
[6:21] BECAUSE WE KNOW THAT FLORIDA HAS
[6:22] 1.5 MILLION VETERANS THAT CALL
[6:24] THIS STATE HOME.
[6:25] SOUTHWEST FLORIDA IS HOME TO
[6:27] WELL OVER 100,000 OF THOSE
[6:28] VETERANS.
[6:29] WE ARE THE THIRD MOST POPULACE
[6:31] STATE WHEN IT COMES TO VETERANS
[6:34] BEHIND CALIFORNIA AND TEXAS.
[6:36] ADJUST PER CAPITA, WE ARE THE
[6:38] MOST DENSE OF THE THREE.
[6:39] FLORIDA TENDS TO LEAD THE WAY
[6:41] WHEN IT COMES TO VETERAN SUICIDE
[6:43] AVERAGING JUST OVER 600 A YEAR.
[6:45] THE WORK THAT WE'VE BEEN DOING
[6:47] HERE IS HELPING TO BATTLE THOSE,
[6:49] THE SUICIDES AND THE DIFFERENT
[6:51] ONGOING EPIDEMIC WE KNOW THAT
[6:53] VETERANS AND THEIR FAMILIES FACE
[6:54] WHEN THEY COME HOME THROUGH WHAT
[6:57] WE CALL A COMMUNITY EMPOWERMENT
[6:58] MODEL.
[6:59] HOME BASE DOESN'T HAVE OUR OWN
[7:00] CLINICS, OUR OWN HOSPITALS, OUR
[7:02] OWN THINGS THAT WE DO.
[7:03] WE PARTNER WITH ORGANIZATIONS
[7:05] LIKE LEE HEALTH AND HELP THEM
[7:07] DELIVER WHAT WE CALL VETERAN
[7:08] CENTERED CARE.
[7:09] LEE HEALTH ALREADY DELIVERS
[7:10] GREAT HEALTH CARE.
[7:11] WE HELP THEM DELIVER VETERAN
[7:12] CENTERED HEALTH CARE.
[7:13] AND THEN WE GO OUT AND FIND THE
[7:15] VETERANS IN THE COMMUNITY WHO
[7:17] ARE SUFFERING FROM THESE WOUNDS,
[7:18] AND WE GET THEM IN THE DOOR AND
[7:20] WE HELP THEM WITH DELIVERING
[7:21] THAT CARE.
[7:22] IN THE PAST, ALMOST 13 YEARS,
[7:23] WE'VE REACHED OVER 5,000
[7:24] VETERANS AND FAMILY MEMBERS
[7:26] ACROSS THE STATE WITH THE
[7:27] MAJORITY OF THEM BEING RIGHT
[7:28] HERE IN SOUTHWEST FLORIDA, AS
[7:30] YOU CAN SEE FROM THAT HEAT MAP
[7:32] UP THERE, THE DARK BLUE AREA
[7:33] BECAUSE OF THE WORK WE'VE DONE
[7:35] RIGHT HERE.
[7:36] THE PURPOSE OF THIS PROJECT AND
[7:37] THIS BUILDING, FOR THE LAST 13
[7:39] YEARS, WE'VE OPERATED PRETTY
[7:41] LEAN.
[7:41] OUT OF OUR OWN HOMES, OUT OF
[7:44] SHARED OFFICE SPACE WE ACQUIRED
[7:46] FROM OUR PARTNERS AT FLORIDA
[7:48] GULF COAST UNIVERSITY.
[7:49] HONORARY DIRECTOR GENERAL
[7:51] FRACTION WOULD SAY, STOLE A
[7:53] GREAT LINE FROM WINSTON
[7:55] CHURCHILL.
[7:56] WE ARE AT THE END OF THE
[7:57] BEGINNING AND READY TO MOVE TO
[7:59] THE NEXT STAGE.
[8:00] DEVELOP A FACILITY THAT CAN
[8:01] SERVE AS HEADQUARTERS FOR ALL OF
[8:02] OUR OPERATIONS HERE IN FLORIDA.
[8:03] WE ARE HERE TODAY TO TALK A
[8:05] LITTLE BIT ABOUT THAT PROJECT
[8:07] AND TO DIVE INTO THAT PROJECT,
[8:08] I'M GOING TO HAND IT BACK OVER
[8:10] TO THE SUFFOLK TEAM AND
[8:12] ISABELLA.
[8:12] THANK YOU.
[8:14] >> THANK YOU VERY MUCH.
[8:15] NOW WE'RE GOING TO MOVE INTO THE
[8:17] PART OF THE PRESENTATION A
[8:18] LITTLE BIT MORE ABOUT THE
[8:19] PROJECT AND THE SITE ITSELF.
[8:21] WITH THAT, WE WANTED TO START
[8:24] HERE WITH A PROPOSED DESIGN
[8:26] APPROACH.
[8:26] FOR CONTEXT, THE SITE IS LOCATED
[8:29] ALONG BEN HILL GRIFFIN PARKWAY
[8:31] ON THE EAST ALONG EVERBLADES
[8:33] PARKWAY ON THE SOUTH AND TIBURON
[8:36] ON THE WEST.
[8:37] IT'S KIND OF THE GREEN PARCEL
[8:39] THAT YOU SEE THAT IS CURRENTLY
[8:41] AN UNDEVELOPED AREA.
[8:42] AND THIS PROPOSED SITE WOULD BE
[8:44] ON THE BOTTOM THIRD PORTION OF
[8:46] IT.
[8:46] AS YOU CAN ALSO SEE, IT IS VERY
[8:48] CLOSE TO THE HERTZ ARENA.
[8:49] THIS WOULD BE THE PROPOSED AREA
[8:52] OF THE PROJECT.
[8:53] SO WHEN WE DIVE IN A LITTLE BIT
[8:55] MORE ABOUT THE PROJECT ITSELF,
[8:57] IT IS GOING TO BE A TWO-STORY
[8:59] BUILDING.
[9:00] NEW GROUND CONSTRUCTION.
[9:02] ABOUT 26,000 SQUARE FEET ON BOTH
[9:04] SPACES.
[9:04] IT IS A FOOTPRINT OF ABOUT
[9:05] 13,000 SQUARE FEET.
[9:06] THE INTENT IS THAT THE BUILDING
[9:08] ITSELF, ALONG WITH THE MAIN
[9:10] LANDSCAPE BUFFER WOULD BE TOWARD
[9:12] THE PLAN RIGHT WHICH IS ALONG
[9:14] BEN HILL GRIFFIN PARKWAY.
[9:15] AND THEN YOU WOULD HAVE A
[9:17] SURFACE LOT ALONG PLAN LEFT
[9:19] ALONG TIBURON WAY WHERE THE
[9:21] ACCESS IS.
[9:21] WITH THAT, I'LL TURN IT OVER TO
[9:25] DEAN MARTIN WITH THE CIVIL
[9:27] ENGINEERING PLANS.
[9:28] >> GOOD AFTERNOON.
[9:29] DEAN MARTIN, TDM CONSULTING.
[9:38] JUST WANT TO SHARE A COUPLE OF
[9:40] SLIDES WITH YOU.
[9:41] THE FIRST SLIDE IS OUR SITE
[9:43] DIMENSION PLAN.
[9:43] I JUST WANT TO POINT OUT THAT WE
[9:45] ARE PROPOSING ONE ACCESS POINT
[9:47] OFF OF TIBURON WAY.
[9:48] IT'S A SHARED ACCESS WITH THE
[9:50] PARCEL TO THE NORTH THAT'S
[9:52] COMING IN.
[9:52] THEY ALREADY HAVE A D.O., I
[9:54] UNDERSTAND, TO COME IN FOR A
[9:55] PROJECT.
[9:55] WE'RE DOING THAT TO ELIMINATE --
[9:59] TO MINIMIZE CONFLICTING TURNING
[10:00] MOVEMENTS ALONG TIBURON WAY.
[10:02] WE THINK THAT WOULD BE A MORE
[10:05] SAFE ENVIRONMENT FOR OUR
[10:07] CUSTOMERS TO COME IN AND BE SAFE
[10:10] ABOUT THEIR ENTRANCE.
[10:11] WE'RE ALSO PROPOSING A COUPLE OF
[10:17] PEDESTRIAN CONNECTIONS.
[10:19] ONE ALONG THE SOUTH GOING TO BEN
[10:22] HILL GRIFFIN AND THEN ONE COMING
[10:24] OUT OF THE BUILDING COMING DOWN
[10:27] TO EVERBLADES PARKWAY.
[10:28] SO PEDESTRIANS CAN ACCESS AS
[10:30] WELL.
[10:30] OUR DUMPSTER IS OVER HERE.
[10:34] IT'S HARD TO SEE RIGHT THERE
[10:37] WHERE THE HAND IS, WITH THE
[10:40] ARROW.
[10:41] OTHER THING I WANT TO POINT OUT,
[10:44] WE ARE PROPOSING A T TURNAROUND
[10:47] FOR EMERGENCY ACCESS UP HERE IN
[10:50] THE NORTHEAST CORNER.
[10:52] THEN THE SECOND SLIDE I WANTED
[10:55] TO SHOW YOU WAS JUST OUR
[10:58] PROPOSED LIGHTING PLAN WITH
[11:00] PHOTOMETRICS SHOWING THAT WE ARE
[11:03] PROPOSING ENOUGH LIGHTING TO BE
[11:06] SAFE FOR EVERYONE ON THE SITE,
[11:09] BUT ALSO WE'RE PROPOSING IN A
[11:12] POSITION SO IT DOESN'T HAVE ANY
[11:15] LIGHT TRESPASS FOR THE
[11:17] RIGHT-OF-WAY OR OUR NEIGHBORS TO
[11:20] THE NORTH.
[11:21] JOSH KELLY WILL COME UP AND TALK
[11:36] ABOUT LANDSCAPING.
[11:41] >> GOOD AFTERNOON.
[11:43] THE LANDSCAPING IS PRETTY
[11:45] STRAIGHTFORWARD ON THIS PROJECT.
[11:47] THE CODE THAT'S IN PLACE IS
[11:49] FAIRLY ROBUST.
[11:50] I THINK IT'S GOING TO BE A VERY
[11:52] NICE PLAN.
[11:53] THE PROJECT SITS IN A MIXED USE
[11:57] OVERLAY AND IS PART OF A PUD.
[12:01] THERE IS A VERY SPECIFIC BUFFER
[12:05] ON BEN HILL GRIFFIN PARKWAY THAT
[12:10] HAS LAYERED TREES AND PALMS AND
[12:14] SOME EXTRA SHRUBS, HEDGEROWS AND
[12:18] THEN SOME GROUND COVER.
[12:21] IT'S A VERY NICE BUFFER.
[12:23] THE BUFFERS ALONG EVERGLADES
[12:26] PARKWAY AND TIBURON --
[12:29] EVERBLADES PARKWAY AND TIBURON
[12:31] ARE STANDARD BUFFER WITH
[12:32] HEDGEROW AND FIVE TREES PER
[12:34] HUNDRED.
[12:35] THERE ARE SOME EXISTING TREES
[12:37] THAT WE'RE GOING TO INCORPORATE
[12:38] WHERE WE CAN.
[12:40] AND THEN AROUND THE BUILDING, WE
[12:42] CHOSE TO ACCENTUATE WITH LARGER
[12:45] PALMS.
[12:45] THEY WILL BE ROYAL PALMS AND
[12:48] SOME SOLITAIRE PALMS THAT ARE
[12:51] VERY ELEGANT.
[12:52] THE BUILDING PERIMETER PLANTINGS
[12:55] ARE GOING TO BE MULTILAYERED
[12:58] WITH SOME EXOTICS IN THERE THAT
[13:02] MOSTLY THE LANDSCAPE IS NATIVE
[13:05] MATERIAL.
[13:06] WE'RE TRYING TO DO AS MUCH
[13:07] XERISCAPE AS WE CAN.
[13:08] THE IRRIGATION IS GOING TO BE
[13:10] VIA A WELL.
[13:12] IT'S GOING TO BE A DRIP
[13:15] IRRIGATION SYSTEM.
[13:16] USING XERISCAPE PRINCIPLES.
[13:20] THE LIGHTING WE'VE WORKED
[13:23] AROUND.
[13:24] THE SOD I BELIEVE IS GOING TO BE
[13:29] BAHIA SOD SO WE CAN KEEP THE
[13:34] IRRIGATION USE LOW AND THE
[13:37] MAINTENANCE LOW.
[13:39] >> ALL RIGHT.
[13:40] SO THE LAST PORTION THAT WE
[13:41] WANTED TO GET INTO, AS WE TALKED
[13:44] ABOUT THE SITE, WE WANT TO WALK
[13:46] YOU THROUGH THE ARCHITECTURE OF
[13:47] THE BUILDING ITSELF AND WHAT
[13:49] THIS WILL LOOK LIKE WITHIN THE
[13:51] VILLAGE OF ESTERO.
[13:52] SO, GIVING YOU A LITTLE BIT OF
[13:54] PERSPECTIVE, ON YOUR RIGHT-HAND
[13:55] SIDE YOU HAVE BEN HILL GRIFFIN
[13:57] PARKWAY.
[13:57] ON THE LEFT-HAND SIDE YOU WOULD
[13:59] HAVE EVERBLADES PARKWAY.
[14:00] THIS WOULD BE THE MOST PROMINENT
[14:01] CORNER OF THE BUILDING.
[14:02] A FEW THINGS WE WANTED TO POINT
[14:04] OUT, AS JOSH MENTIONED,
[14:05] LANDSCAPING IS VERY IMPORTANT.
[14:07] THERE'S CURRENTLY A LOT OF
[14:09] EXISTING TREES SURROUNDING THIS
[14:11] PARTICULAR CORNER.
[14:11] THE INTENT IS TO KEEP AS MUCH AS
[14:13] WE CAN AND MINIMIZE IMPACT TO
[14:15] THE DEVELOPMENT.
[14:15] AS WE LOOK AT THE ARCHITECTURAL
[14:17] CHARACTER OF IT, WE'VE BEEN
[14:18] INSPIRED BY THE MEDITERRANEAN
[14:20] STYLE THAT YOU CAN SEE
[14:21] THROUGHOUT THE VILLAGE.
[14:22] AND THIS IS REFLECTED IN A
[14:24] COUPLE OF DIFFERENT AREAS.
[14:25] THE FIRST ONE IS THE COLOR
[14:29] PALETTE, USING SOME NEUTRAL
[14:32] COLORS, WHICH WE HAVE RIGHT
[14:35] HERE.
[14:36] SO THESE WOULD BE KIND OF THE
[14:38] TWO MAIN COLOR PALETTES THAT WE
[14:39] WOULD GO OFF OF AND PLAY ON
[14:41] ARCHITECTURAL STYLE.
[14:42] A LOT OF THE MAIN BUILDING WILL
[14:44] BE STUCCO.
[14:45] SO IT FITS WELL WITHIN THE
[14:47] FLORIDA ENVIRONMENT.
[14:47] A COUPLE OF OTHER AREAS WE
[14:49] WANTED TO HIGHLIGHT, THE
[14:50] MECHANICAL EQUIPMENT WILL ALL BE
[14:52] ON THE ROOF AND IT WILL BE IN A
[14:55] SINKEN WELL.
[14:55] IT WILL NOT BE VISIBLE FROM THE
[14:57] STREET LEVEL.
[14:58] IT'S ALL KIND OF RECESSED INTO
[15:00] THE ROOF.
[15:00] THE ROOF ITSELF WILL HAVE BARREL
[15:03] TILE TO MATCH WITH THE VILLAGE
[15:05] OF ESTERO ARCHITECTURAL
[15:06] PREFERRED METHOD.
[15:07] AS WE GO AROUND THE BUILDING,
[15:09] IMPORTANT THING TO NOTE, ALL
[15:10] FOUR SIDES OF THE BUILDING ARE
[15:12] TREATED AS THE FRONT DOOR.
[15:14] THERE IS NO BACK OF THE
[15:16] BUILDING.
[15:16] I WILL SHOW YOU THIS IN ANOTHER
[15:18] VIEW IN A MINUTE.
[15:20] AS WE LOOK AT THE USE OF THIS
[15:23] BUILDING, AS ARMANDO WITH HOME
[15:25] BASE MENTIONED, THIS IS REALLY A
[15:27] COMMUNITY WELLNESS BUILDING FOR
[15:28] THE VILLAGE OF ESTERO,
[15:30] ESPECIALLY FOR ITS VETERAN.
[15:31] ON THE LEFT-HAND SIDE OF THE
[15:33] BUILDING, YOU'LL SEE A PLAZA.
[15:34] THIS WILL BE A VETERANS MEMORIAL
[15:36] PLAZA WITH A PROPOSED FOUNTAIN.
[15:39] BE ABLE TO BE A GOOD SPACE FOR
[15:41] THE COMMUNITY GATHERING, AND
[15:43] THEN WE WILL ALSO HAVE A FLAG
[15:45] PARK WHICH YOU CAN SEE ON THE
[15:48] CORNER OF THE BUILDING WITH ALL
[15:50] THE FLAGS OF THE DIFFERENT
[15:52] MILITARY BRANCHES WILL BE
[15:53] DISPLAYED.
[15:53] AS WE GO TOWARDS THE ACCESS
[15:56] TIBURON WAY, THIS IS IF YOU WERE
[15:58] TO BE DRIVING INTO THE BUILDING.
[16:00] AS I MENTIONED BEFORE, ALL OF
[16:02] THE SIDES OF THE BUILDING HAVE
[16:05] CONSIDERED A GOOD ARCHITECTURAL
[16:06] CHARACTER.
[16:06] A COUPLE OF SELECT ITEMS
[16:09] REGARDING THE MEDITERRANEAN
[16:10] STYLE HAVE TO DO WITH OVERHANGS,
[16:13] ESPECIALLY FOR ENTRANCES, MAKING
[16:15] WAYFINDING EASY, PROVIDING SHADE
[16:17] IN CERTAIN AREAS.
[16:18] A COUPLE OF OTHER THINGS IS ALSO
[16:20] THE ROOF BRACKETS.
[16:21] IT'S A LITTLE HARD TO SEE ON
[16:23] THIS IMAGE BUT IT WILL BE
[16:25] INCORPORATED THROUGHOUT THE
[16:26] ENTIRETY OF THE BUILDING TO MAKE
[16:28] SURE THE ARCHITECTURAL STYLES
[16:29] ARE TIED TOGETHER.
[16:30] WHEN YOU LOOK AT THE TWO TOWERS,
[16:32] THE TWO TOWERS THAT WE HAVE
[16:34] CURRENTLY ARE GOING TO BE USED
[16:36] FOR VERTICAL CIRCULATION, SO WE
[16:38] HAVE ONE ELEVATOR, AND WE HAVE
[16:40] THE STAIRS AS WELL.
[16:41] AND THE INTENT IS TO USE, AS WE
[16:45] SAID, KIND OF STUCCO ON THESE
[16:47] COLORS THROUGHOUT, BUT ALSO HAVE
[16:49] A LITTLE BIT OF AN ACCENT AREA
[16:51] WITH SOME STONE TO MAKE SURE
[16:54] THAT IT ALL TIES TOGETHER IN THE
[16:56] ARCHITECTURAL CHARACTER.
[16:57] THE LAST TWO SLIDES WE WANTED TO
[17:00] SHOW THE ELEVATIONS.
[17:01] THEY PORTRAY THE 2D VISUAL FROM
[17:04] THE RENDERINGS.
[17:04] THE MAIN ITEM WE WANTED TO SHOW
[17:06] HERE IS THE HEIGHT.
[17:07] SO THE OVERALL HEIGHT OF THE
[17:09] BUILDING THROUGHOUT IS GOING TO
[17:11] BE AROUND 37 FEET AND A HALF,
[17:14] THE HIGHEST POINT, ONLY AT THE
[17:16] TWO TOWERS IS ABOUT 40 FEET.
[17:18] FOR CONTEXT, THE BUILDINGS
[17:20] ACROSS THE STREET ON EVERBLADES
[17:22] ARE ANYWHERE FROM 30 TO 35 FEET
[17:25] TALL.
[17:25] SCALE-WISE, IT'S GOING TO BE
[17:27] WITHIN THE SIMILAR SCALE OF THE
[17:29] CURRENT EXISTING CONDITIONS.
[17:31] AS WE MOVE TO THE OTHER TWO
[17:33] ELEVATIONS, YOU'LL SEE A VARIETY
[17:34] OF GLASS AND GLAZING HERE.
[17:36] THIS GLASS WAS GOING TO BE RATED
[17:39] FOR CODE AND IMPACT HURRICANE.
[17:41] IT'S GOING TO BE A CLEAR GLASS,
[17:44] NON-REFLECTIVE.
[17:44] IT'S GOING TO BE TYING INTO THE
[17:47] ARCHITECTURAL OVERALL CHARACTER.
[17:48] WE WILL ALSO HAVE BUILDING
[17:50] LIGHTING, WHICH WILL RIGHT NOW
[17:52] CONCEPTUALLY WE'RE INTENDING TO
[17:54] BE THESE VERTICAL LIGHT WALL
[17:56] PACKS ON THE WALL.
[17:58] THEY WILL TIE TO THE OVERALL
[18:00] MEDITERRANEAN STYLE OF THE
[18:02] ARCHITECTURE OF THE BUILDING.
[18:03] WITH THAT, WE WANT TO JUST THANK
[18:06] YOU FOR YOUR TIME AND YOUR
[18:08] APPRECIATION.
[18:09] WE HAVE ONE MORE SLIDE.
[18:10] I'M SORRY.
[18:12] ONE MORE SLIDE ABOUT THE
[18:13] MATERIALS.
[18:13] SO AS WE TALKED ABOUT, THIS IS A
[18:16] LITTLE MORE OF A ZOOMED IN OF
[18:18] THE COLORS THAT WE HAVE HERE, SO
[18:19] YOU CAN SEE THE TWO COLORS ON
[18:21] THE LEFT-HAND SIDE ARE THESE
[18:23] ONES, WHICH WOULD BE KIND OF
[18:24] YOUR MAIN STUCCO COLORS.
[18:26] ON THE BOTTOM LEFT-HAND CORNER,
[18:27] WE ARE INTENDING TO HAVE PRECAST
[18:29] CONCRETE BASE AND CAP.
[18:30] THIS WILL KIND OF BE THE
[18:32] HORIZONTAL BANDS THAT ARE ACROSS
[18:34] THE BUILDING.
[18:34] AND THEY WILL ALSO GO ALONG WITH
[18:37] THE WHITE TRIM.
[18:38] ALL PLAYING WITHIN THE
[18:40] MEDITERRANEAN KIND OF STYLE
[18:41] COLORS.
[18:42] WE TALKED ABOUT THE BARREL ROOF
[18:44] TILE, SO SOMETHING LIKE THIS IS
[18:47] WHAT WE'RE INTENDING TO HAVE.
[18:49] THE WINDOWS ITSELF, AS WE SAID,
[18:51] IT'S GOING TO BE CLEAR, BUT IT'S
[18:53] GOING TO HAVE WHITE TRIM, AT
[18:55] LEAST THAT'S WHAT WE'RE THINKING
[18:56] ABOUT INITIALLY TO BE ABLE TO
[18:58] TIE EVERYTHING TOGETHER.
[18:59] THEN YOU'LL SEE THE WOOD TRELLIS
[19:00] THERE.
[19:01] WE HAVE ON THE SECOND STORY ON
[19:04] THE NORTHEAST CORNER A LITTLE
[19:07] BALCONY FOR THE SPACES UP THERE.
[19:10] THE BALCONY OVERLOOK BEN HILL
[19:12] GRIFFIN PARKWAY.
[19:12] THE INTENT IS TO PROVIDE A WOOD
[19:15] TRELLIS TO PROVIDE SHADING IF
[19:16] THERE ARE ANY TYPE OF SPACES OUT
[19:19] THERE.
[19:19] OVERALL, AS I MENTIONED, THE
[19:21] STONE ACCENT AND OVERHANG
[19:22] DETAIL, ALL OF THESE COMPONENTS
[19:24] ARE IMPORTANT TO MAKE SURE THE
[19:26] BUILDING NOT ONLY FITS THE
[19:28] COMMUNITY THAT IT'S SERVING BUT
[19:30] IT ALSO FITS THE ARCHITECTURAL
[19:32] STYLE THAT THE VILLAGE OF ESTERO
[19:34] HAS PUT FORTH.
[19:35] WITH THAT, WE'LL END OUR
[19:36] PRESENTATION AND OPEN IT UP FOR
[19:38] ANY QUESTIONS.
[19:39] THANK YOU VERY MUCH.
[19:42] >>Michael Sheeley: CAN YOU TELL
[19:43] US ABOUT INTERIOR FUNCTION IN
[19:44] THE BUILDING?
[19:45] WHAT IS IN THE BUILDING?
[19:46] >> SURE.
[19:47] I'LL HAVE ARMANDO COME UP AND
[19:51] TALK ABOUT THAT.
[19:53] >> SO THE SERVICES THAT ARE
[19:55] OFFERED IN THE BUILDING, FIRST
[19:57] AND FOREMOST, THIS IS GOING TO
[19:59] SERVE AS ADMIN SPACE FOR THE
[20:00] MAJORITY OF THE HOME BASE TEAM
[20:02] THAT LIVES -- OPERATES IN
[20:04] FLORIDA THAT LIVES IN SOUTHWEST
[20:05] FLORIDA.
[20:06] AS WELL A BIG COMPONENT WILL BE
[20:08] WELLNESS BASED SPACE, LIKE A
[20:10] GYM, SLASH REHAB SPACE FOR
[20:12] HEALTH AND FITNESS PROGRAMS, AS
[20:14] WELL AS REHAB PROGRAMS.
[20:16] COOKING DEMO KITCHEN IN THERE AS
[20:18] WE LOOK TO AGAIN EMPHASIZE OUR
[20:19] HEALTH AND WELLNESS COMPONENTS.
[20:21] SO WE'LL BE DOING NUTRITIONAL
[20:23] EDUCATION TYPE OF CONTENT.
[20:24] THERE WILL BE A SMALL EVENT
[20:26] SPACE IN THERE AS WELL THAT IS
[20:29] MEANT TO HOST SOME FUND-RAISING
[20:31] EVENTS THAT WE HOST ON AN ANNUAL
[20:33] BASIS AS WELL AS TRAININGS.
[20:35] WE DO A LOT OF CLINICAL TRAINING
[20:38] FOR CLINICIANS SUCH AS
[20:39] PSYCHOLOGISTS AND LICENSED
[20:40] MENTAL HEALTH COUNSELORS AND
[20:42] CASE MANAGEMENT WORKERS WHO WORK
[20:44] IN THE COMMUNITY.
[20:45] OUR ORGANIZATION ACTUALLY COMES
[20:46] DOWN AND TRAINS THEM, AND THE
[20:48] LATEST AND GREATEST
[20:49] EVIDENCE-BASED TRAUMA THERAPIES
[20:50] AND DIFFERENT MODALITIES TO HELP
[20:52] TREAT OUR VETERANS IN THE
[20:53] COMMUNITY AS WELL AS OTHER
[20:55] MEMBERS IN THE COMMUNITY.
[20:56] WE'LL ALSO HAVE A SMALL AMOUNT
[20:59] OF COUNSELING SPACE THAT CAN BE
[21:01] USED FOR TELEHEALTH SERVICES.
[21:03] IF A VETERAN COMES INTO THE
[21:04] BUILDING, LET'S SAY THEY GO TO
[21:06] THEIR EXERCISE APPOINTMENT OR
[21:07] REHAB APPOINTMENT AND THEN THEY
[21:09] ARE MEETING WITH ONE OF THEIR
[21:10] CLINICIANS, THEY CAN GO
[21:11] UPSTAIRS.
[21:12] BY CLINICIAN, I MEAN TALK
[21:13] THERAPY IS THE TYPE OF SUPPORT
[21:16] THAT WE PROVIDE.
[21:17] THEY CAN GO UPSTAIRS AND EITHER
[21:19] MEET WITH A THERAPIST IN PERSON
[21:21] OR VIA TELEHEALTH CAPABILITIES
[21:23] AS WELL.
[21:23] IT'S IMPORTANT TO NOTE THAT THAT
[21:25] EVENT SPACE IS ALSO GOING TO BE
[21:27] OPEN TO THE VETERAN COMMUNITY.
[21:29] SO, FOR INSTANCE, FGCU, AS THEY
[21:31] ARE DEVELOPING THEIR ROTC
[21:33] PROGRAM, MAY NEED SPACE TO HOST
[21:35] DIFFERENT EVENTS.
[21:36] WE'LL WELCOME THEM INTO THE
[21:38] SPACE TO DO THAT.
[21:39] THE ESTERO MILITARY ENGAGEMENT
[21:40] COMMITTEE, WHICH I PERSONALLY
[21:41] SERVE ON, RIGHT NOW WE'RE
[21:43] OPERATING OUT OF THE LIBRARY,
[21:44] BUT WE WOULD OPEN UP THIS
[21:46] FACILITY TO SERVE THAT GROUP AS
[21:48] WELL.
[21:48] SO THOSE ARE THE LARGE FUNCTIONS
[21:51] OF IT.
[21:52] THERE'S EVENT SPACE, SMALL
[21:53] AMOUNT OF COUNSELING SPACE, BUT
[21:55] THE MAJORITY OF IT IS ADMIN
[21:57] SPACE AND PHYSICAL REHAB AND
[21:58] FITNESS SPACE.
[21:59] >>Michael Sheeley: ARMANDO, AS
[22:01] U.S. ARMY VETERAN MYSELF, I
[22:03] THANK YOU AND COMMEND YOU FOR
[22:06] BRINGING THIS FACILITY TO
[22:08] ESTERO.
[22:09] I WOULD ASK THE BOARD IF ANYONE
[22:12] HAS ANY QUESTIONS OR COMMENTS.
[22:14] >>Dan Williams: TWO QUESTIONS,
[22:15] IF I MAY.
[22:15] I TAKE IT ALL SERVICES BEING
[22:17] PROVIDED OR OUTPATIENT BASIS,
[22:18] CORRECT?
[22:19] >> ABSOLUTELY.
[22:19] ALL SERVICES ARE OUTPATIENT
[22:21] BASIS.
[22:21] >>Dan Williams: SECOND QUESTION,
[22:22] WHAT ARE THE PROPOSED HOURS OF
[22:24] OPERATION?
[22:24] >> SO OUR WELLNESS PROGRAMS TEND
[22:26] TO RUN A LITTLE BIT EARLIER IN
[22:28] THE MORNING.
[22:29] THOSE USUALLY START AROUND 6
[22:30] A.M.
[22:30] BUT USUALLY WRAPPED UP BY 5 P.M.
[22:32] ON A DAILY BASIS.
[22:33] THE MAJORITY OF THE SERVICES
[22:35] WOULD BE BETWEEN 9 AND 5, BUT
[22:37] THE HEALTH AND WELLNESS
[22:38] SERVICES, OFTENTIMES WE'RE
[22:39] TRYING TO GET TO THAT YOUNGER
[22:40] VETERAN POPULATION BEFORE THEY
[22:42] GO TO WORK, WE OPEN UP AT 6 A.M.
[22:44] TO START SERVING THAT
[22:45] POPULATION.
[22:46] >>Dan Williams: THANK YOU.
[22:47] >>James Tatooles: I'VE GOT A
[22:48] QUESTION.
[22:48] I'M ALSO A VETERAN.
[22:50] OF COURSE, ANYTHING YOU DO FOR
[22:52] THE PEOPLE THAT ARE NEEDING
[22:55] SERVICES IS APPRECIATED, OF
[22:56] COURSE.
[22:57] MY QUESTION IS HOW DOES THIS TIE
[22:59] IN WITH VETERANS ADMINISTRATION
[23:00] FACILITIES AND WHAT THEY DO
[23:01] COMPARED TO WHAT YOU DO?
[23:03] HOW DO YOU UNITE AND WORK
[23:05] TOGETHER OR DON'T YOU?
[23:06] >> ABSOLUTELY, YES.
[23:07] WE WORK VERY CLOSELY WITH THE
[23:09] VA.
[23:09] AT OUR HEADQUARTERS IN BOSTON,
[23:10] WE ACTUALLY HAVE AN MOU WITH THE
[23:12] VA.
[23:12] WE HAVE A VA CASE MANAGER WHO IS
[23:14] EMBEDDED IN OUR CLINIC.
[23:15] ANYTIME A VETERAN WHO COMES INTO
[23:17] HOME BASE IS GETTING SERVICES,
[23:19] IF THEY NEED ADDITIONAL CARE OR
[23:21] NEED TO GET SIGNED UP WITH THE
[23:23] VA, WE CONNECT THEM WITH THE
[23:25] CASE MANAGER AND GET THEM
[23:26] CONNECTED AUTOMATICALLY.
[23:27] WE'RE VERY WELL TIED IN WITH THE
[23:30] LOCAL VAs AS WELL.
[23:31] WE REFER OUT -- ANY VETERAN WHO
[23:34] COMES IN AND ISN'T CONNECTED TO
[23:36] THE VA, WE ENCOURAGE THEM TO
[23:38] SIGN UP.
[23:40] WE WORK VERY CLOSELY WITH THE
[23:42] FLORIDA DEPARTMENT OF VETERANS
[23:43] AFFAIRS AND GENERAL HARTSELL,
[23:44] WHO IS THE EXECUTIVE DIRECTOR
[23:46] THERE, AND WORKING WITH ENSURING
[23:48] THAT WE'RE KIND OF MEETING THEIR
[23:50] STANDARDS AND THEY ARE ACTUALLY
[23:52] EVEN FUNDING SOME OF OUR PROGRAM
[23:54] ON A YEAR-TO-YEAR BASIS.
[23:55] >>Michael Sheeley: OTHER
[23:56] QUESTIONS FROM THE BOARD.
[23:58] >>James Tatooles: JUST WONDERING
[24:00] ABOUT THE TYPE OF PEOPLE, THEIR
[24:03] NEED REQUIREMENTS.
[24:04] WHAT KIND OF HANDICAP FACILITIES
[24:07] OR ANYTHING ABOVE THE NORMAL
[24:10] ARCHITECTURAL REQUIREMENTS FOR
[24:12] SPECIAL NEEDS PEOPLE?
[24:14] DO YOU HAVE ANYTHING THAT
[24:16] HANDLES THAT TYPE OF A PERSON?
[24:18] >> SURE.
[24:19] RIGHT NOW, IN TERMS OF EVEN WHEN
[24:22] YOU ENTER THE SITE HAVE THE
[24:24] REQUIRED ADA CAPACITIES.
[24:26] WE WILL HAVE AN ELEVATOR
[24:29] ON-SITE.
[24:29] IT'S GOING TO BE BIG ENOUGH TO
[24:31] FIT A STRETCHER.
[24:32] IN TERMS OF KIND OF THE
[24:33] OCCUPIABLE SPACES, AS ARMANDO
[24:35] MENTIONED, A LOT OF THE SPACE ON
[24:37] THE GROUND FLOOR WILL BE THE
[24:39] GYM, EVENT SPACE AND ANY
[24:40] CLINICIAN OR ANY APPOINTMENT
[24:41] LIKE THAT WOULD BE ON THE SECOND
[24:43] FLOOR.
[24:44] THOSE ARE SOME OF OUR ORIGINAL
[24:46] THOUGHTS, EITHER SPECIFIC ITEMS
[24:48] THAT THE VILLAGE OR ANYTHING HAS
[24:50] IN MIND, WE CAN CERTAINLY LOOK
[24:52] INTO THEM TO INCORPORATE THEM AS
[24:55] NEEDED.
[24:55] >> I WOULD JUST ADD OUR SERVICES
[24:57] AROUND THE WELLNESS AND REHAB,
[24:59] WE HAVE PHYSICAL THERAPISTS AND
[25:01] OTHER PROFESSIONALS WHO ARE
[25:02] SPECIFICALLY WORKING WITH
[25:03] VETERANS WHO ARE DEALING WITH
[25:04] SERVICE RELATED INJURIES AS
[25:06] WELL.
[25:06] NOT ONLY IS THE BUILDING
[25:09] COMPLIANT BUT THE SERVICES THAT
[25:12] WE PROVIDE ARE AIMED AT HELPING
[25:15] THEM REGAIN CONTROL OF THEIR
[25:18] PHYSICAL HEALTH AND WELLNESS
[25:20] AGAIN.
[25:21] >>Kristin Jeannin: I DO HAVE A
[25:23] FEW DESIGN-RELATED COMMENTS.
[25:25] FIRST, I WANT TO COMMEND THE
[25:27] PROJECT OVERALL AND THE
[25:29] PRESENTATION.
[25:29] VERY EXCITED FOR ESTERO TO HAVE
[25:32] THE OPPORTUNITY TO HOST THIS
[25:34] HOME BASE PROJECT.
[25:35] IT SEEMS PHENOMENAL.
[25:36] SO THANK YOU.
[25:39] MOST OF MY COMMENTS ARE
[25:41] LANDSCAPE RELATED.
[25:42] I'M A LANDSCAPE ARCHITECT.
[25:43] THERE ARE A COUPLE OF
[25:45] ARCHITECTURAL COMMENTS.
[25:46] IN GENERAL, I THINK THE BUILDING
[25:49] LOOKS BEAUTIFUL.
[25:50] I GUESS I WILL START WITH
[25:52] ARCHITECTURE SINCE YOU ARE UP
[25:54] THERE.
[25:55] I HAVE A MINOR CONCERN ABOUT THE
[25:58] SAND COLOR.
[25:59] IT LOOKS A LITTLE DARK.
[26:02] YOUR RENDERINGS LOOK NICE AND
[26:04] LIGHT.
[26:04] I THINK THAT THE BUILDING, LIKE,
[26:07] SUPPORTS BEING LIGHT.
[26:09] SO JUST BE CAREFUL OF THAT.
[26:11] TAKE ANOTHER --
[26:12] >> WE CAN LOOK AT THE COLOR
[26:14] SWATCHES.
[26:14] NO PROBLEM.
[26:17] >>Kristin Jeannin: LANDSCAPE
[26:18] ARCHITECTURE-WISE, I REALIZE
[26:19] THIS -- I MEAN, IT'S NICE.
[26:21] I THINK THIS IS AN EARLY DRAFT
[26:25] AND YOU PROBABLY NEED TO
[26:27] COORDINATE A LITTLE BIT WITH THE
[26:30] FLAG.
[26:31] IT LOOKS LIKE IT WILL BE A
[26:33] BEAUTIFUL AND MEANINGFUL FOCAL
[26:35] POINT FOR THE PROJECT.
[26:37] SO THE LANDSCAPE NEEDS TO
[26:39] REFLECT THAT.
[26:39] ALSO WITH THE PLAZA, RIGHT NOW,
[26:41] HOW IT'S DRAWN IS JUST CONCRETE.
[26:43] SO MAYBE THERE ARE PLANTERS THAT
[26:46] NEED TO GO IN THERE TO SOFTEN
[26:50] THAT.
[26:50] I'M NOT ADVOCATING ONE WAY OR
[26:52] THE OTHER NECESSARILY, BUT MAKE
[26:54] SURE SOMEBODY IS THINKING ABOUT
[26:56] IF FOR THAT SECOND FLOOR TRELLIS
[26:58] YOU WANT TO HAVE ANY PLANTINGS
[27:00] UP THERE, THERE'S SOME WORK THAT
[27:02] NEEDS TO BE DONE THERE TO MAKE
[27:04] SURE THAT ALL FUNCTIONS
[27:06] CORRECTLY.
[27:06] BAHIA SOD CONCERNS ME A LITTLE
[27:08] BIT, TOO.
[27:09] I KNOW IT GETS WEEDY.
[27:11] MAYBE THAT'S OKAY, BUT WHAT I
[27:13] WOULD MAYBE PROPOSE IS, OR HAVE
[27:15] YOU LOOK AT, WHAT ARE THEY DOING
[27:18] IN THE OTHER SURROUNDING.
[27:20] LET'S MATCH WHATEVER THEY ARE
[27:21] DOING THERE WOULD BE MY
[27:23] RECOMMENDATION.
[27:23] >> I THINK FLORITAM IS THE GRASS
[27:26] OF THE DAY IN THAT AREA.
[27:28] WE MAY BE ABLE TO USE THAT.
[27:30] IT JUST DEPENDS ON WHAT WE CAN
[27:33] DO WITH THE IRRIGATION.
[27:35] >>Kristin Jeannin: I UNDERSTAND
[27:36] THE MEANING AND THE INTENT
[27:38] BEHIND IT, AND IF YOU THINK THAT
[27:41] THERE ARE WAYS THAT IT CAN BE
[27:43] MANAGED WELL, BY ALL MEANS,
[27:45] FIGHT FOR IT.
[27:46] >> BAHIA CAN BE VERY LUSH, AS
[27:49] LONG AS YOU KEEP WATERING AND
[27:51] FEEDING IT.
[27:51] IT KIND OF DEFEATS THE PURPOSE
[27:54] OF THE XERISCAPE DESIGN.
[27:55] BUT WE'LL WORK WITH THAT.
[27:57] I'M NOT OPPOSED TO USING
[27:59] FLORITAM.
[28:00] >>Kristin Jeannin: I HAVEN'T
[28:01] LOOKED AT IT EITHER, BUT WE
[28:03] WOULD BE OPEN TO LOOKING AT IF
[28:06] THERE ARE BUFFERS THAT BLOCK
[28:07] THAT FLAG.
[28:08] IF THERE'S ANYTHING EXISTING
[28:11] THAT'S IN THE WAY.
[28:13] >> WE HAVE TO WORK THAT FLAG
[28:14] INTO THE DESIGN A LITTLE BETTER.
[28:16] THERE IS A BIG EASEMENT THAT'S
[28:18] BETWEEN THAT BUFFER AND THE
[28:20] BUILDING.
[28:20] IT'S KIND OF AN ODD THING.
[28:22] THERE'S ALSO ONE THAT RUNS ALONG
[28:25] EVERBLADES PARKWAY THAT'S BEHIND
[28:27] THE PARKWAY, AND THAT WAS A
[28:29] CHALLENGE TO WORK AROUND THAT.
[28:32] THERE'S STILL A LITTLE BIT OF
[28:33] WORK TO DO ON THAT.
[28:34] >>Kristin Jeannin: IS THAT THE
[28:36] SOUTH SIDE OF THE BUILDING WHERE
[28:39] THE OUTDOOR.
[28:40] >> UM-HUM.
[28:40] WHAT YOU'RE LOOKING AT IS A CODE
[28:43] MINIMUM PLAN.
[28:44] >>Kristin Jeannin: SURE, SURE.
[28:45] >> I'M SURE WE'RE GOING TO
[28:46] ENHANCE SOME THINGS HERE AND
[28:48] THERE.
[28:48] >>Kristin Jeannin: THANK YOU.
[28:52] >>James Tatooles: I WAS GOING TO
[28:54] SAY IT'S A NICE-LOOKING
[28:55] BUILDING.
[28:55] WHAT I'M LOOKING AT IS PEOPLE
[28:58] HAVING THE ACCESS TO SEE IT FROM
[29:01] THE PARKING LOT SIDE, YOU CAN
[29:03] SEE THE BUILDING, AND IT'S ALL
[29:05] OPEN.
[29:06] I JUST WONDER WHEN YOU LOOK AT
[29:08] IT FROM THE OPPOSITE SIDE, IF
[29:11] ALL THE VEGETATION AND THE TREES
[29:13] AND BUSHES, ET CETERA, HIDE THE
[29:15] BEAUTY OF THE BUILDING FROM THE
[29:17] STREET.
[29:18] IT LOOKS TO ME THAT YOU ARE
[29:20] BUILDING A FORESTED WALL IN
[29:22] FRONT OF THE BUILDING.
[29:24] >> YOU'RE NOT WRONG, SIR.
[29:25] I THINK PART OF THAT IS SOME OF
[29:28] THE REQUIREMENTS NOT ONLY FROM
[29:30] THE PLANTING SIDE.
[29:32] WHEN WE DID OUR ORIGINAL
[29:34] SURVEYS, THERE IS A HUNDRED FOOT
[29:36] UNIVERSITY WINDOW KIND OF
[29:38] EASEMENT.
[29:38] AS JOSH SAYS, A MATTER OF GOING
[29:40] BACK AND MAKING SURE THAT THE
[29:42] BUILDING IS VISIBLE ON BOTH
[29:43] SIDES WHILE ALSO HAVING A GOOD
[29:45] BALANCE BETWEEN THE LANDSCAPE
[29:46] AND THE PLANTING.
[29:47] BUT WE'LL DEFINITELY TAKE IT
[29:49] INTO CONSIDERATION IN THE NEXT
[29:52] ROUND.
[29:52] >>Michael Sheeley: AL, DO YOU
[29:53] HAVE ANY COMMENTS?
[29:54] >>Al Paivandy: YES.
[29:56] AGAIN, THANK YOU, JUST LIKE
[29:59] EVERYBODY ELSE SAYS, FOR --
[30:01] >>Tammy Duran: CAN YOU MAKE SURE
[30:02] YOU ARE SPEAKING INTO THE
[30:03] MICROPHONE, PLEASE?
[30:04] THANK YOU.
[30:05] >>Al Paivandy: FINE.
[30:06] [ LAUGHTER ]
[30:10] THANK YOU FOR WANTING TO LOCATE
[30:12] HERE AND HAVE YOUR MAIN BUILDING
[30:14] HERE.
[30:14] WE APPRECIATE THAT.
[30:16] I HAVE A COUPLE OF COMMENTS.
[30:19] WHENEVER I SEE THE PERSPECTIVE
[30:22] HERE, I NOTICE THE PEOPLE
[30:24] WALKING AROUND THE FRONT.
[30:26] I'M NOT SURE EXACTLY HOW THEY
[30:27] ARE GOING TO GET THERE AND WHY
[30:28] THEY WANT TO WALK AROUND THE
[30:29] BUILDING.
[30:30] THE SECOND IS, THE FRONT IS A
[30:34] LITTLE BIT MORE OF A PUNCHED OUT
[30:39] WINDOWS AND NOT NECESSARILY ANY
[30:42] VERTICAL ELEMENT.
[30:43] I DID NOTICE, ALTHOUGH WITHOUT A
[30:45] FLOOR PLAN, A LITTLE BIT
[30:47] DIFFICULT, BUT FROM THE SITE
[30:49] THAT YOU HAVE ALIGNED THE TOWER
[30:52] IN THE BACK WITH THE FRONT.
[30:54] SO IF YOU GET RID OF THAT TOWER
[30:57] THAT YOU CAN NEVER SEE IN THE
[31:00] BACK FROM THE FRONT, BECAUSE
[31:02] PEOPLE ARE IN THE CAR OR DRIVING
[31:05] AND YOU WON'T SEE THAT THE WHOLE
[31:07] FRONT IS JUST A FLAT, LONG
[31:09] TRAIN.
[31:10] IF YOU CAN WORK WITH THAT TO
[31:13] PULL SOME ELEMENTS UP TO
[31:15] ACCENTUATE THE FRONT, ESPECIALLY
[31:16] THAT IS MORE SEEN BY THE
[31:19] DRIVING, IN ADDITION TO THE
[31:21] FLAGS, IT MAY WORK BETTER FOR
[31:23] YOU.
[31:23] >> GREAT.
[31:25] YEAH, WE CAN LOOK AT SOME OF THE
[31:29] VOLUMETRIC RELATIONSHIPS.
[31:30] WE CAN MAYBE PLAY WITH THE
[31:31] MATERIALS, GIVE OR TAKE.
[31:32] I THINK KIND OF SIMILAR COMMENT
[31:35] OF MAKING SURE THAT MAIN FACADE
[31:37] AROUND BEN HILL GRIFFIN PARKWAY
[31:39] IS REALLY THE MAIN WELCOMING
[31:41] FACE OF THE BUILDING.
[31:43] ABSOLUTELY.
[31:43] >>Al Paivandy: RIGHT.
[31:43] SINCE THAT TERIS IS IN THE
[31:45] FRONT -- TERRIS IS IN THE FRONT,
[31:47] I WOULD CERTAINLY DO SOMETHING
[31:49] WITH THAT.
[31:50] USE IT AS A POP-OUT FOR THE
[31:53] BUILDING OR MORE PLEASANTRIES.
[31:55] THANK YOU AGAIN.
[31:59] >>Michael Sheeley: LASTLY, I
[32:01] THINK THE BUILDING LOOKS GOOD.
[32:02] I THINK YOU'VE DONE A NICE JOB
[32:05] OF KIND OF MODERNIZING A
[32:06] MEDITERRANEAN DESIGN.
[32:07] I THINK IT'S QUITE ATTRACTIVE.
[32:10] I AGREE WITH SOME OF THE OTHER
[32:12] COMMENTS HERE.
[32:13] I THINK THE BUILDING IS REMEMBER
[32:16] SEDATE AND IT KIND OF LAYS BACK
[32:20] AND MAYBE THAT'S WHAT IT SHOULD
[32:23] BE.
[32:23] THE COLOR PALETTE, WITH THE KIND
[32:26] OF REFINED LINE THAT YOU HAVE.
[32:29] I WOULD MAYBE THINK ABOUT THE
[32:31] PLAZA ON THE SOUTH SIDE.
[32:34] IF YOU REALLY WANT IT TO BE
[32:36] USABLE, SOME COVERING THERE
[32:38] WOULD BE HELPFUL BECAUSE IN THE
[32:40] SUMMERTIME, YOU'RE GOING TO GET
[32:42] BLASTED BY THE SUN.
[32:44] >> ABSOLUTELY.
[32:45] >>Michael Sheeley: I THINK
[32:46] OVERALL YOU'VE DONE A GOOD JOB.
[32:48] I APPRECIATE YOUR PRESENTATION.
[32:50] >> OF COURSE.
[32:50] THANK YOU VERY MUCH.
[32:50] >>Michael Sheeley: TAMMY, DO WE
[32:52] HAVE ANY PUBLIC COMMENT ON THIS?
[32:54] >>Tammy Duran: WE DO NOT.
[32:55] >>Michael Sheeley: IS THERE
[32:56] ANYONE HERE IN THE AUDIENCE WHO
[32:58] WOULD LIKE TO MAKE A COMMENT
[33:00] ABOUT THIS PROJECT?
[33:01] SEEING NONE -- OH, WE HAVE ONE.
[33:03] >>Tammy Duran: HOLD ON ONE
[33:05] SECOND.
[33:05] MAKE SURE WHEN YOU ARE DONE THAT
[33:07] YOU FILL OUT A CARD.
[33:08] >> THANK YOU.
[33:09] MY NAME IS ALAN WHITE.
[33:11] I LIVE IN TIDEWATER RIGHT OUT
[33:13] FRONT.
[33:13] I'M ALSO A VETERAN.
[33:15] WE'RE ECSTATIC.
[33:16] WE'VE BEEN WAITING TEN YEARS TO
[33:18] FIND OUT -- HOW APROPOS TO HAVE
[33:20] SOMETHING LIKE THIS TO COME.
[33:23] WE FULLY ENDORSE THAT.
[33:25] FOR MY SAKE, I'M ALSO THE
[33:28] CHAIRMAN OF THIS NEW CAPE CORAL
[33:30] VA CLINIC EXPANSION TO A
[33:33] FULL-SERVICE HOSPITAL COMMITTEE.
[33:34] WE'LL BE WORKING WITH FGCU.
[33:36] WE DEFINITELY WOULD LIKE TO WORK
[33:38] WITH THESE PEOPLE.
[33:38] WE'RE TRYING TO BRING MORE AND
[33:41] MORE MEDICAL SERVICES TO OUR
[33:43] OVER 100,000 VETERANS THAT LIVE
[33:45] IN SOUTHWEST FLORIDA.
[33:46] OVER 61,000 LIVE IN LEE COUNTY.
[33:48] SO THIS IS GREAT.
[33:49] THANK YOU.
[33:50] >>Michael Sheeley: THANK YOU
[33:52] VERY MUCH.
[33:52] ANYONE ELSE?
[33:54] WE'LL CLOSE THE PUBLIC HEARING.
[33:55] WE THANK YOU FOR YOUR
[34:00] PRESENTATION.
[34:01] [ APPLAUSE ]
[34:15] >>Michael Sheeley: WE'LL GIVE
[34:26] EVERYONE A MOMENT TO CLEAR THE
[34:44] ROOM.
[35:19] LET'S GET STARTED WITH ITEM
[35:22] NUMBER 6, THE WORKSHOP FOR LEO
[35:26] BROWN GROUP.
[35:27] PLEASE.
[35:35] >>Aymee Chavez: NEXT ON THE
[35:38] AGENDA IS THE WORKSHOP FOR
[35:40] MISSION GROVE OF ESTERO FOR THE
[35:43] REVISED ARCHITECTURE.
[35:44] THE APPROXIMATELY SEVEN ACRE
[35:46] PROPERTY IS LOCATED WITHIN THE
[35:48] PLAZA DEL SOL COMMERCIAL PLANNED
[35:50] DEVELOPMENT, WHICH IS NORTH OF
[35:52] THE CULVER'S AND AUTO ZONE AT
[35:55] THE CORNER OF THREE OAKS PARKWAY
[35:58] AND CORKSCREW ROAD WITH ACCESS
[36:00] FROM ARCOS AVENUE.
[36:01] THE PUBLIC INFORMATION MEETING
[36:03] FOR MISSION GROVE WAS HELD AT
[36:06] THE JULY 21st PZDB MEETING.
[36:09] THE PROJECT INCLUDES 163
[36:12] ASSISTED LIVING CONTINUING CARE
[36:15] AND INDEPENDENT LIVING UNITS,
[36:19] ALONG WITH ASSOCIATED AMENITIES.
[36:22] [BEEP]
[36:22] >> YOU ARE OUT OF TIME.
[36:23] [ LAUGHTER ]
[36:24] >>Tammy Duran: SORRY.
[36:25] >>Aymee Chavez: THE APPLICANT
[36:26] HAS MADE CHANGES TO THE
[36:28] ARCHITECTURE SINCE THE PUBLIC
[36:30] INFORMATION MEETING AND IS
[36:31] LOOKING FOR INPUT FROM THE BOARD
[36:33] ON THE UPDATED RENDERINGS AND
[36:35] DESIGN.
[36:35] THERE WILL BE NO VOTE OR
[36:39] DISCUSSION ON THIS WORKSHOP
[36:42] ITEM.
[36:43] DISCUSSION SHOULD BE FOCUSED
[36:44] ONLY ON THE PROPOSED
[36:46] ARCHITECTURE AND NOT RELATED TO
[36:47] ANY OTHER COMPONENTS OF THE
[36:49] PROJECT.
[36:50] PLEASE NOTE THAT BOARD MEMBER
[36:52] JIM WALLACE PROVIDED WRITTEN
[36:53] COMMENTS IN ADVANCE OF THE
[36:55] MEETING.
[36:55] AND IF THERE ARE NO QUESTIONS,
[36:57] I'LL TURN IT OVER TO THE
[36:59] APPLICANT TO BEGIN.
[37:00] I BELIEVE THE ATTORNEY FOR THE
[37:03] APPLICANT, NEALE MONTGOMERY,
[37:04] WILL BE STARTING US OFF.
[37:06] >>Michael Sheeley: THANK YOU
[37:09] VERY MUCH.
[37:11] >>Neale Montgomery: GOOD
[37:12] AFTERNOON.
[37:13] NEALE MONTGOMERY FOR THE RECORD.
[37:13] THANK YOU FOR THE OPPORTUNITY.
[37:21] [MICROPHONE NOT ON] [INAUDIBLE]
[37:58] [MICROPHONE NOT ON]
[38:14] >> THERE WE GO.
[38:15] >> DO YOU WANT ME TO SAY IT
[38:17] AGAIN?
[38:18] >> NO, WE COULD HEAR YOU.
[38:20] >> GET CLOSER TO IT TO MAKE
[38:22] SURE.
[38:22] >> WE HAVE THE APPLICANT,
[38:24] LINDSEY PHIPPS AND BILL MORTON
[38:27] HERE.
[38:27] STACY ELLIS IS HERE.
[38:31] AND GLEN, THE ARCHITECT IS HERE,
[38:34] TO GO THROUGH THE ITEM WE TALKED
[38:36] ABOUT.
[38:37] AYMEE ALREADY TOLD YOU WHERE IT
[38:40] IS LOCATED.
[38:41] >>Kristin Jeannin: CAN YOU GO
[38:43] BACK TO THE SLIDE, THE LOCATION?
[38:45] I'M TRYING TO GET CAUGHT UP.
[38:48] THE MAP, PLEASE.
[38:51] >>Neale Montgomery: I-75,
[38:52] CORKSCREW IS IN THE INTERIOR OF
[38:56] THAT PARTICULAR PROJECT.
[38:57] THAT PROJECT WAS ORIGINALLY
[39:00] APPROVED WHEN IT WAS IN THE
[39:04] UNINCORPORATED AREA, AND A LOT
[39:07] OF DEVELOPMENT ACTUALLY OCCURRED
[39:10] WHILE IT WAS STILL IN THE
[39:14] UNINCORPORATED AREA.
[39:16] A PORTION WAS IN THE INTERCHANGE
[39:17] AND URBAN COMMUNITY.
[39:18] SOME OF THE PROVISIONS MAY NOT
[39:25] BE THE SAME AS YOU MIGHT EXPECT
[39:33] TODAY BUT THAT WAS THE GENESIS
[39:41] OF THE PARTICULAR PROJECT.
[39:45] >> GOOD EVENING.
[39:47] I'M GLEN BAURHYTE.
[39:48] GOOD TO SEE YOU AGAIN.
[39:49] WE'RE EXCITED TO BE BACK WITH
[39:52] YOU AND SHARE THE ARCHITECTURAL
[39:54] UPDATES.
[39:54] WE LAST CAME BEFORE YOU TWO
[39:57] MONTHS AGO AND RECEIVED FEEDBACK
[39:59] AND APPRECIATED THAT.
[40:01] BROUGHT IT BACK TO THE OFFICE
[40:03] AND TOOK IT TO HEART AND USED
[40:06] YOUR GUIDANCE AND SUGGESTIONS AS
[40:08] A BASIS FOR DEVELOPING OUR
[40:10] DESIGN FURTHER.
[40:10] THE PRIMARY TAKEAWAYS FROM THE
[40:12] LAST MEETING WAS ESSENTIALLY
[40:14] THAT YOU GUYS LIKED THE PROJECT.
[40:17] THEY EXPECTED THE ARCHITECTURE
[40:18] TO BE MORE EXPRESSIVE.
[40:20] MORE ARTICULATED AND LESS
[40:24] MONOCHROMATIC.
[40:25] AND LESS DOMINATED BY A HEAVY
[40:28] ROOFLINE.
[40:28] LET ME WALK THROUGH SOME BEFORE
[40:32] AND AFTER ILLUSTRATIONS.
[40:34] AT THE TOP HERE IN JULY, THIS
[40:42] WAS THE DESIGN.
[40:45] SOME OF THE NOTABLE CHANGES ARE
[40:47] BRIGHTER OVERALL COMPOSITION.
[40:48] THE ROOF APPEARS A LESS HEAVY,
[40:52] LESS BROWN, RATHER MORE
[40:55] TERRA-COTTA AND I HAVE SAMPLES
[40:58] HERE.
[40:58] WE CHANGED THE ROOF COLOR TO
[41:02] BARBADOS BLEND.
[41:03] THERE'S MORE VERTICAL EXPRESSION
[41:05] OF THE ARCHITECTURAL ELEMENTS
[41:07] HERE.
[41:07] WE'VE ADDED SOME ADDITIONAL
[41:09] BREAKS, AND THEN EVEN BROUGHT
[41:12] THEM UP HIGHER.
[41:13] THERE WERE COMMENTS THAT YOU ALL
[41:15] LIKED SOME OF THE BELL TOWER
[41:17] EFFECTS, SO WE EXPRESSED THAT
[41:19] MORE AND CARRIED THAT FORWARD IN
[41:21] OTHER LOCATIONS.
[41:22] WE HAVE MORE VARIETY OF COLORS
[41:24] THAT ARE HARMONIOUS WITH EACH
[41:26] OTHER.
[41:26] WE ELIMINATED THE GOLD AND
[41:29] BROUGHT IN THIS COLOR CALLED
[41:32] AKNACK ARE A AND WE BROUGHT IN
[41:36] AN ADDITIONAL COLOR CALLED CARGO
[41:39] PANTS.
[41:40] IN ADDITION TO THAT, WE HAVE
[41:43] ADDITIONAL DETAILING AROUND THE
[41:45] WINDOW OPENINGS, A VARIATION OF
[41:48] THE WINDOW OPENINGS.
[41:49] AND CONTRAST WITH SOME OF THE
[41:53] TRIM COLORS.
[41:54] >>Michael Sheeley: MUCH
[41:54] IMPROVED.
[41:55] >> THANK YOU.
[41:56] THIS IS THE ELEVATION OF THAT
[41:58] SAME VIEW.
[41:59] THE TOP IS THE OLD.
[42:00] THE BOTTOM IS THE NEW HERE.
[42:03] YOU CAN SEE WE REDUCED NUMBER OF
[42:06] DOUBLE WINDOWS AND KIND OF
[42:08] VARIED THAT BY HAVING SINGLE
[42:10] WINDOWS AND DOUBLES, EVEN ARCHED
[42:11] WINDOWS IN HERE.
[42:12] WE ADDED DETAIL AT THE COLONNADE
[42:16] HERE WITH TRIM AT THE BASE AND
[42:21] AT THE SPRING LINE AND BRACKETS
[42:24] AT THE ROOFLINE.
[42:26] >>Michael Sheeley: IT'S LIKE A
[42:28] DIFFERENT BUILDING.
[42:28] YOU'VE DONE WELL.
[42:31] >> HERE IS A ZOOM IN AT THE
[42:34] ENTRY SO YOU CAN SEE SOME OF THE
[42:37] DETAIL A LITTLE BIT MORE.
[42:38] ADDED TRIM AROUND HERE.
[42:40] THE WINDOWS REALLY PUNCH OPEN.
[42:44] WE'RE SHOWING THE SCONCES.
[42:48] SOME OF THE DETAIL OF THE
[42:51] ARCHITECTURAL TILE SHOW THROUGH
[42:52] AT THE GABLES.
[42:53] AGAIN, JUST BROUGHT UP SOME OF
[42:55] THE VERTICAL ELEMENTS HERE.
[42:57] AT THE EAST ELEVATION, YOU CAN
[43:00] SEE WE REALLY BROUGHT MORE OF A
[43:04] RESIDENTIAL STYLE OF VERTICAL
[43:06] ARTICULATION.
[43:07] WE ENHANCED THE DETAILS AT THE
[43:10] BASE OF THIS CORNER BALCONY
[43:12] FEATURE ELEMENT HERE AND TRIM
[43:14] AROUND THE ARCHES.
[43:16] YOU CAN SEE THE BRACKETS AT THE
[43:24] ROOFLINE.
[43:25] OVERALL, A LOT LESS REPETITION
[43:28] THAN WE HAD FROM BEFORE AND
[43:33] HAVING VARIED DESIGN ELEMENTS.
[43:36] >>Al Paivandy: I LIKE IT SO
[43:38] MUCH, EVEN THE CLOUD IN SOUTH
[43:40] FLORIDA LOOK BETTER.
[43:41] >> THE CLOUDS LOOK BETTER, ALL
[43:44] RIGHT.
[43:44] HERE IS THE ELEVATION BEFORE AND
[43:51] THEN AFTER.
[43:53] THIS WAS THE MOST EGREGIOUS
[43:55] ELEVATION FROM LAST TIME, I
[43:57] THINK THE COMMENT WAS.
[43:59] IT LOOKED LIKE A TRAIN OF
[44:01] WINDOWS, AND WE WORKED REALLY
[44:03] HARD ON THIS ONE.
[44:04] VARIED THE WINDOWS.
[44:05] WE PUSHED FORWARD THE
[44:08] PROJECTIONS AND THE VERTICAL.
[44:10] >> IT'S A HUGE DIFFERENCE.
[44:11] >> ROUNDED OUT SOME OF THE
[44:14] WINDOWS.
[44:15] THIS PARTICULAR PART OF THE
[44:17] BUILDING DOES NOT HAVE
[44:18] BALCONIES, BUT WE MADE AN
[44:20] ATTEMPT TO MAKE THE DESIGN MORE
[44:23] COHESIVE BY INTRODUCING SOME
[44:25] JULIET BALCONIES SCATTERED
[44:26] THROUGHOUT THERE.
[44:27] YOU CAN SEE THE TRIM IS AROUND
[44:31] THE MAJORITY OF THE WINDOWS
[44:34] ADDING SOME ADDITIONAL CONTRAST,
[44:36] SHUTTERS.
[44:36] THE OLD ELEVATION AND THEN THE
[44:41] NEW ELEVATION.
[44:43] >>James Tatooles: JUST LOOKING
[44:45] AT THAT IMAGE, THE BUILDING ON
[44:48] THE TOP LOOKS SO DARK AND
[44:51] DISMAL.
[44:51] >>Michael Sheeley:
[44:53] INSTITUTIONAL.
[44:53] >>James Tatooles: AND LOOK AT
[44:54] HOW IT HAS LIVENED UP AND
[44:57] BRIGHTENED UP, LOOKING LIKE IT
[44:58] IS CHEERFUL COMPARED TO THE
[45:00] DISMAL ONE UP ABOVE.
[45:01] I THINK THERE'S BEEN A DRAMATIC
[45:03] CHANGE IN YOUR APPROACH HERE AND
[45:06] I APPRECIATE IT.
[45:07] >> THANK YOU.
[45:10] THE REAR HERE, WE APPLIED ALL
[45:11] THE SAME ELEMENTS ALL THE WAY
[45:13] AROUND THE BUILDING AND THEN
[45:14] ALSO A FOCUS AND ATTENTION ON
[45:15] THE GARAGES.
[45:16] WE ADDED SOME COLOR, SOME
[45:19] SHUTTERS AT THE END, AND THEN
[45:22] BROKE UP THE ROOF LINE BY ADDING
[45:25] GABLES AND BOOSTED HIPS AND
[45:28] BRACKETS AND SO ON.
[45:30] AT THE POOL, WE WANTED TO MAKE
[45:33] SURE THAT THE INTENT WAS VERY
[45:35] CLEAR HERE ON THE SHADING.
[45:37] OUTDOOR AMENITY, THERE'S LOTS OF
[45:38] SHADE HERE.
[45:39] TWO SCREENED IN ENCLOSURES RIGHT
[45:41] HERE AND THE ONE TUCKED BACK
[45:44] OVER HERE.
[45:45] WE'RE SHOWING NOW THE SHADE
[45:47] STRUCTURE THAT'S ON THE POOL
[45:49] DECK.
[45:50] 16-FOOT BY 16-FOOT FIELD BUILT
[45:53] PAVILION, IF YOU WILL, WITH A
[45:56] MATCHING TILE ROOF.
[45:58] WE'RE SHOWING THE POOL
[46:00] UMBRELLAS.
[46:01] WE HAVE SOME SHADE SAILS AT THE
[46:04] BOCCE BALL AREA.
[46:05] OVERALL, THIS WILL BE ADDING TO
[46:09] THE LIFE OF THE COMMUNITY AS A
[46:13] GREAT PLACE TO SOCIALIZE AND
[46:16] PARTICIPATE IN VARIOUS
[46:18] ACTIVITIES AS WELL AS COOL DOWN
[46:22] IN THE POOL.
[46:23] OVERALL, JUST ADDED DETAILS
[46:25] HERE.
[46:25] LEVELS OF COPING AND BASE TRIM.
[46:30] SOME GABLES THAT WEREN'T THERE
[46:32] BEFORE.
[46:33] THE VERTICAL EXPRESSION IS MORE
[46:37] PROMINENT.
[46:38] MORE RESIDENTIAL READING THAN
[46:41] INSTITUTIONAL.
[46:42] THIS IS THE OLD GARAGE AND THEN
[46:44] THE NEW GARAGE.
[46:45] WE CHANGED SOME COLORS.
[46:46] WE BOOSTED THE CENTER MAST
[46:49] THERE.
[46:49] IT HAD A COUPLE OF -- ADDED A
[46:52] COUPLE OF DECORATIVE GABLES AS
[46:54] WELL.
[46:54] SIMILAR WITH THE OTHER GARAGE.
[47:00] REALLY NO CHANGE ON THE TRASH
[47:01] COMPACTOR.
[47:02] I THINK WE CHANGED THE DOOR
[47:05] COLOR ONLY.
[47:06] AND THEN THE SAME WITH THE
[47:07] MONUMENT SIGN.
[47:08] NO CHANGE THERE.
[47:11] THAT'S IT FOR ARCHITECTURAL.
[47:13] HAPPY TO ANSWER ANY QUESTIONS.
[47:14] >>Michael Sheeley: WELL DONE,
[47:16] AND WE THANK YOU FOR LISTENING.
[47:18] I THINK THIS BOARD HAS EARNED
[47:21] ITS SALARY.
[47:22] [ LAUGHTER ]
[47:25] GREATLY BY YOUR IMPROVEMENTS.
[47:27] I HOPE YOU AGREE THE
[47:27] IMPROVEMENTS ARE REALLY GOOD FOR
[47:28] THE PROJECT.
[47:29] >> YEAH, IT WAS A GOOD
[47:32] EXPERIENCE.
[47:33] I'M HAPPY THAT THE CLIENT IS
[47:35] ALSO HAPPY WITH IT AND YOU GUYS
[47:38] ARE SEEMINGLY APPROVING OF IT.
[47:39] >>Michael Sheeley: THANK YOU.
[47:44] >>Al Paivandy: I'LL TAKE THE
[47:45] PLANS HOME AND SEE IF MY WIFE
[47:47] WOULD AGREE TO MOVE IN.
[47:48] >> WE'LL TAKE RESERVATIONS.
[47:50] >>Kristin Jeannin: IS THERE A
[47:52] LANDSCAPE PRESENTATION AT ALL?
[47:53] >> TODAY WAS JUST FOCUSING ON
[47:57] THE ARCHITECTURAL.
[47:58] >>Michael Sheeley: ANY OTHER
[48:01] QUESTIONS OR COMMENTS?
[48:03] >>James Tatooles: ANOTHER
[48:04] COMMENT.
[48:05] I THINK THAT IT'S GOOD WHEN YOU
[48:07] CAN MAKE THE BUILDING REFLECT
[48:08] WHAT THE USE OF THE BUILDING IS.
[48:10] BEFORE IT DIDN'T.
[48:11] IT JUST LOOKED LIKE A STRUCTURE.
[48:13] AND NOW IT LOOKS MORE LIKE A
[48:17] USEFUL BUILDING RATHER THAN JUST
[48:20] A STRUCTURE.
[48:21] >>Michael Sheeley: ANYTHING
[48:23] ELSE?
[48:23] THANK YOU.
[48:27] >> [INAUDIBLE]
[48:29] >>Michael Sheeley: THE TRIM
[48:30] COLOR HELPED OUT THERE.
[48:32] THANKS VERY MUCH.
[48:33] ANY CARDS FROM THE PUBLIC,
[48:35] TAMMY?
[48:35] >>Tammy Duran: NO, WE DON'T HAVE
[48:37] ANYTHING.
[48:37] >>Michael Sheeley: ANYONE HERE
[48:39] WISH TO SPEAK ON THIS?
[48:43] SEEING NONE, WE'LL CLOSE THE
[48:44] PUBLIC HEARING.
[48:45] WE THANK YOU FOR THE
[48:50] PRESENTATION.
[48:51] NEXT UP IS ITEM 7B,
[49:16] WOODFIELD/COCONUT POINT, CPD.
[49:43] >> GOOD EVENING.
[49:44] FOR THE RECORD, MICHAEL MANNING,
[49:46] ASSISTANT VILLAGE MANAGER AND
[49:48] ASSISTANT COMMUNITY DEVELOPMENT
[49:49] DIRECTOR.
[49:50] THE NEXT ITEM ON THE AGENDA IS
[49:52] PUBLIC INFORMATION MEETING FOR
[49:53] WOODFIELD.
[49:54] THE APPROXIMATELY 46-ACRE
[49:55] PROPERTY IS LOCATED AT THE
[49:56] NORTHWEST CORNER OF TAMIAMI
[49:58] TRAIL AND COCONUT ROAD ACROSS
[49:59] THE STREET FROM COCONUT POINT
[50:01] MALL.
[50:01] THE APPLICANT IS HERE TONIGHT TO
[50:03] REVIEW A PROPOSED AMENDMENT TO
[50:05] THE MASTER CONCEPT PLAN TO ALLOW
[50:07] FOR COMMERCIAL USES ON BLOCK
[50:08] ONE, WHICH IS THE NORTHEAST
[50:10] CORNER OF THE SITE, ELIMINATE
[50:11] THE MAXIMUM NUMBER OF STORIES
[50:13] WITHOUT INCREASING OVERALL
[50:14] HEIGHT AND ADDING A DEVIATION
[50:15] RELATING TO PARKING ON BLOCKS
[50:17] ONE AND EIGHT.
[50:18] DESIGN FOR BLOCK ONE CURRENTLY
[50:20] INCLUDES TOWNHOMES, MULTIFAMILY
[50:21] UNITS AND NEIGHBORHOOD PARK.
[50:23] UNDER THE PROPOSED CHANGE, THE
[50:24] TOWNHOMES AND MULTIFAMILY UNITS
[50:25] WOULD BE REPLACED WITH A SURFACE
[50:27] PARKING LOT.
[50:27] WHILE THE EXISTING PROPOSED
[50:29] NEIGHBORHOOD PARK WOULD REMAIN.
[50:31] BLOCK 8 CURRENTLY CALLS FOR
[50:33] PARKING GARAGE, OFFICE,
[50:33] COMMERCIAL USES WHICH WOULD BE
[50:35] REPLACED WITH A GROCERY STORE.
[50:36] PLEASE NOTE THAT BOARD MEMBER
[50:38] JIM WALLACE PROVIDED COMMENTS IN
[50:39] ADVANCE OF THE MEETING.
[50:41] WITH THAT, I'LL TURN IT OVER TO
[50:44] THE APPLICANT TO BEGIN THE
[50:47] PRESENTATION.
[50:48] >>Michael Sheeley: THANK YOU.
[50:49] >> HELLO.
[50:50] GOOD TO SEE YOU ALL AGAIN.
[50:54] I'M ROSS ABRAMSON WITH WOODFIELD
[50:56] DEVELOPMENT.
[50:57] I'LL TAKE YOU THROUGH A BIT --
[51:00] >>James Tatooles: WE HAVE THE
[51:02] SAME PROBLEM WITH THE MICROPHONE
[51:04] BEING TOO FAR AWAY.
[51:05] >>Tammy Duran: YOU CAN PUT IT ON
[51:13] THE LEDGE.
[51:15] >> HOW DO I SCAN THROUGH THE
[51:26] PRESENTATION?
[51:28] [PHONE RINGING]
[51:32] >> WE HAVE TO GO.
[51:33] [ LAUGHTER ]
[51:40] >> OKAY.
[51:41] TO JUST TOUCH ON THE LOCATION,
[51:44] THIS IS ON THE INTERSECTION OF
[51:47] U.S. 41 AND COCONUT ROAD ACROSS
[51:51] THE STREET FROM THE COCONUT
[51:54] POINT MALL.
[51:55] THIS THING ISN'T WORKING.
[52:21] OKAY.
[52:21] SO THE AMENDMENT AS EXPLAINED,
[52:25] WE'RE MAINTAINING THE EXISTING
[52:27] APPROVED HEIGHTS -- THE BUILDING
[52:30] IS AT 45 FEET.
[52:33] THREE STORY LIMITATION AND
[52:35] MEDIAING THE MASTER CONCEPT PLAN
[52:38] TO ADD COMMERCIAL -- I'LL
[52:40] EXPLAIN IT.
[52:41] KIND OF MAKES SENSE.
[52:42] IT WOULD BE THE PARKING LOT FOR
[52:46] THE ADJACENT COMMERCIAL SPACE.
[52:48] THIS IS THE OLD ONE.
[52:51] CAN WE PULL UP THE ONE THAT WAS
[52:53] SENT TO MARY?
[52:54] >>Tammy Duran: THAT WAS THE ONE
[53:06] SENT TO MARY TODAY.
[53:14] THE LAST ONE I GOT WAS AT LIKE
[53:43] 11.
[53:51] >> TAMMY, TELL SOME JOKES WHILE
[53:53] WE'RE WAITING.
[53:53] [ LAUGHTER ]
[53:56] >>Kristin Jeannin: DO YOU WANT
[53:57] TO TAKE A FIVE-MINUTE RECESS TO
[53:58] HAVE THEM WORK IT OUT?
[54:00] IT WILL PROBABLY TAKE A MINUTE.
[54:04] TAKE SOME PRESSURE OFF THEM.
[54:11] >>Michael Sheeley: SHE'S PUTTING
[54:22] IT ON A FLASH DRIVE NOW.
[54:38] >> EVERYTHING WENT REALLY
[54:40] SMOOTHLY UP UNTIL WE GOT UP
[54:42] HERE.
[54:42] >>Michael Sheeley: NO PROBLEM.
[54:44] ON THE RADIO, THEY CALL THIS
[55:04] DEAD AIR.
[55:11] DO SOME KARAOKE.
[55:13] >> LOOKING GOOD NOW.
[55:24] >> THANK YOU, GUYS.
[55:25] SORRY ABOUT THAT.
[55:26] >> NO PROBLEM.
[55:28] >>Michael Sheeley: YOU'RE UNDER
[55:29] CONSTRUCTION NOW, I SEE.
[55:31] >> YEAH, ABSOLUTELY.
[55:33] SO LOCATION, WE'RE GOOD WITH
[55:34] THAT.
[55:34] I WANT TO TAKE A STEP BACK AND
[55:36] KIND OF GO THROUGH A LITTLE BIT
[55:38] OF THE HISTORY OF THE SITE.
[55:39] IN JULY OF '23, THE ZONING WAS
[55:41] APPROVED FOR THE PROJECT.
[55:43] THAT OUTLINED THE MASTER PLAN
[55:45] INFRASTRUCTURE, THE LOTS, THE
[55:47] BLOCKS, THE PARKS AND ALSO THE
[55:49] DENSITY OF THE SITE, THE MAXIMUM
[55:52] NUMBER OF APARTMENTS, OF OFFICE,
[55:54] OF RETAIL, OF HOTEL.
[55:56] AND THAT'S IMPORTANT TO NOTE
[55:58] BECAUSE WE'RE NOT REQUESTING ANY
[56:00] AMENDMENTS TO THE DENSITIES
[56:02] ALREADY APPROVED ON THE SITE,
[56:04] THE HEIGHTS OF THE BUILDINGS.
[56:06] IT'S SIMPLY A LITTLE BIT OF A
[56:08] RESTRUCTURING OF WHERE SOME OF
[56:10] THOSE USES GO WITHIN THE ALREADY
[56:12] APPROVED SITE.
[56:13] AND THEN THE AREA IN THE KIND OF
[56:16] BOTTOM RIGHT HAND CORNER, THAT
[56:18] WAS THE FIRST DEVELOPMENT ORDER
[56:19] THAT WAS APPROVED FOR THE
[56:21] PROJECT LAST SUMMER.
[56:22] WE STARTED CONSTRUCTION SHORTLY
[56:24] THEREAFTER.
[56:25] ABOUT A YEAR AGO NOW, AND WE'RE
[56:27] LOOKING FORWARD TO MOVING IN
[56:29] FIRST RESIDENTS SUMMER OF NEXT
[56:30] YEAR.
[56:30] CONSTRUCTION IS GOING ALONG
[56:32] REALLY WELL THERE.
[56:34] WE HAVE OUR LATEST AERIAL
[56:35] CONSTRUCTION PHOTO, THIS IS
[56:37] MAYBE A WEEK, TWO WEEKS AGO.
[56:38] SO A LOT OF THE MASTER
[56:41] INFRASTRUCTURE IS IN PLACE WITH
[56:43] STORMWATER, WATER, SEWER.
[56:44] THE LAKES ARE IN PLACE.
[56:47] THE BUILDINGS ARE ALMOST ABOUT
[56:49] TOPPED OUT.
[56:50] STARTING WITH THE GARAGES.
[56:51] WE JUST DROVE PAST THERE TODAY.
[56:53] THEY ARE STARTING WITH THE
[56:55] ROUNDABOUT ON COCONUT ROAD.
[56:56] SO THAT WILL REALLY IMPROVE THAT
[56:58] KIND OF EXPERIENCE ON COCONUT
[57:00] THERE.
[57:00] IT'S GOING TO LOOK GREAT.
[57:02] NOW THAT WE'RE WELL UNDERWAY
[57:04] WITH CONSTRUCTION OF THE FIRST
[57:06] HALF OF THE PROJECT, WE'RE
[57:08] STARTING TO MOVE OUR EFFORTS TO
[57:10] THE REMAINING PORTIONS, REALLY
[57:12] THE NORTH AND WEST PART OF THE
[57:15] PROJECT.
[57:15] ON THE LEFT-HAND SIDE, YOU COULD
[57:18] SEE THE APPROVED SITE PLAN AND
[57:20] THEN THE PROPOSED AMENDMENT ON
[57:22] THE RIGHT-HAND SIDE.
[57:24] ON THE LEFT-HAND SIDE, THE
[57:25] APPROVED SITE PLAN, YOU CAN SEE
[57:28] THE LARGEST GREEN BUILDING
[57:29] THAT'S RUNNING EAST-WEST WAS
[57:31] ORIGINALLY DESIGNED AS A
[57:32] TWO-STORY COMMERCIAL AND OFFICE
[57:34] BUILDING.
[57:34] IT'S 20,000 SQUARE FEET OF
[57:36] COMMERCIAL RETAIL SPACE ON THE
[57:38] GROUND FLOOR.
[57:39] 20,000 SQUARE FEET OF OFFICE ON
[57:41] THE SECOND FLOOR.
[57:41] SO REALLY WHAT WE'RE PROPOSING
[57:44] HERE IS KIND OF THAT GROUND
[57:46] FLOOR RETAIL SPACE OF 20,000
[57:48] SQUARE FEET, KIND OF BRINGING
[57:51] THAT OVER TO WHAT WE'RE
[57:53] PROPOSING AS A GROCERY STORE TO
[57:56] ADD HERE.
[57:57] AND THEN DROPPING THE OFFICE
[57:58] BUILDING DOWN TO A SINGLE LEVEL
[58:00] OFFICE BUILDING.
[58:01] WE'RE NOT ADDING MUCH.
[58:02] IT'S ABOUT 10,000 SQUARE FEET OF
[58:04] COMMERCIAL SPACE.
[58:05] STILL WITHIN THE PARAMETERS OF
[58:07] THE APPROVED DENSITY OF THE
[58:10] PROJECT.
[58:10] BUT WE HAVE NOW SIGNED AN
[58:13] AGREEMENT -- WE CAN'T SAY THE
[58:14] NAME OF THE GROCER, BUT IT'S A
[58:17] NATIONAL ORGANIC GROCER.
[58:18] WE'LL SAY THAT.
[58:19] SO THESE ARE THE AMENDMENTS THAT
[58:21] WE NEED TO INCORPORATE THAT INTO
[58:23] THE SITE PLAN.
[58:24] SO WHEN WE FIRST STARTED WORKING
[58:26] ON THE SITE PLAN, WE IMMEDIATELY
[58:28] REACHED OUT TO DOVER, KOHL AND
[58:30] PARTNERS WHO WERE ENGAGED BY LEE
[58:32] HEALTH BEFORE US AND THEN BY US
[58:34] TO DO REFINING THE MASTER PLAN
[58:36] ARCHITECTURE, THE LAY OUT OF THE
[58:38] LOTS, BLOCKS, AND PARKS.
[58:40] WE GOT THEM INVOLVED WITH THIS
[58:43] REDESIGN.
[58:43] REALLY, THEY FOCUS ON TWO
[58:45] THINGS.
[58:45] NUMBER ONE IS THEY SAID MIXED
[58:48] USE PROJECT LIKE THIS ALWAYS
[58:50] BENEFITS FROM AN ANCHOR TENANT.
[58:52] AND LEE HEALTH WHEN THEY WERE
[58:55] PROPOSING THIS, THEY HAD A
[58:57] MEDICAL WELLNESS VILLAGE OR
[58:59] WELLNESS CENTER AND THEN A
[59:01] PERFORMING ARTS CENTER AS PART
[59:03] OF THAT.
[59:04] HE SAID ADDING A GROCER OF THIS
[59:06] CALIBER WOULD BE INCREDIBLE, NOT
[59:08] ONLY TO AN AMENITY TO THE
[59:10] PROJECT BUT THE SURROUNDING
[59:12] NEIGHBORHOOD AND ALSO ADD TO THE
[59:14] VIBRANCY AND THE EXPERIENCE THAT
[59:15] WE'RE ALL TRYING TO CREATE HERE
[59:18] IN THIS PROJECT.
[59:19] SO WE ARE FULLY SUPPORTIVE OF
[59:21] THAT USE HERE.
[59:22] THE NEXT THING HE SAID WAS THE
[59:24] MOST IMPORTANT THING IS KEEPING
[59:26] THAT MASTER INFRASTRUCTURE IN
[59:27] PLACE.
[59:28] THOSE LOTS AND BLOCKS.
[59:29] HE WAS VERY INTENTIONAL ABOUT
[59:31] MAKING SURE THAT THEY WERE SMALL
[59:34] BLOCKS, PEDESTRIAN ORIENTED,
[59:35] VERY WALKABLE AND FRIENDLY.
[59:37] SO THAT MAINTAINS THAT KIND OF
[59:40] BLOCK DESIGN.
[59:41] AS FAR AS SUSTAINABILITY FOR THE
[59:44] FUTURE, SHOULD ANY USE BECOME
[59:45] OBSOLETE OR JUST KIND OF NOT THE
[59:48] HIGHEST AND BEST AT THAT TIME,
[59:50] 30, 50 YEARS FROM NOW, YOU CAN
[59:53] SIMPLY REDEVELOP THE BLOCKS AS
[59:54] NEEDED, BUT IT DOESN'T REALLY
[59:56] AFFECT THE WHOLE MASTER PLAN AS
[59:58] A WHOLE.
[59:59] SO YOU STILL MAINTAIN THAT
[1:00:02] FLEXIBILITY.
[1:00:03] THE OTHER IMPORTANT ITEM TO NOTE
[1:00:05] HERE IS BECAUSE THAT NORTHEAST
[1:00:07] CORNER THAT ORIGINALLY WAS
[1:00:08] APPROVED WITH A PARKING LOT IN
[1:00:10] THE MIDDLE OF THE RESIDENTIAL
[1:00:12] UNITS, WE WORKED WITH THE
[1:00:14] VILLAGE AND WE AGREED TO AN
[1:00:16] ENHANCED LANDSCAPE BUFFER THERE.
[1:00:17] SO IN THAT AREA, IT'S 32 FEET
[1:00:21] VERSUS THE STANDARD 20-FOOT
[1:00:23] LANDSCAPE BUFFER.
[1:00:24] WE ALREADY BUILT IN THAT
[1:00:26] ENHANCED LANDSCAPE BUFFER THAT
[1:00:28] WOULD BE MAINTAINED.
[1:00:30] SO NO KIND OF AMENDMENTS OR
[1:00:32] REDUCTION TO THAT.
[1:00:34] >>Michael Sheeley: LET ME ASK.
[1:00:35] THE NORTHEAST CORNER NOW ON YOUR
[1:00:38] LEFT-HAND PLAN, THE APPROVED
[1:00:40] SITE PLAN, FIVE GREEN BOXES WERE
[1:00:43] BUILDING FOOTPRINTS.
[1:00:44] >> THAT'S RIGHT.
[1:00:44] >>Michael Sheeley: AND THEY WERE
[1:00:46] RESIDENTIAL?
[1:00:47] >> YEAH, THE LARGEST ONE WAS
[1:00:49] THAT COMMERCIAL BUILDING THAT I
[1:00:51] MENTIONED.
[1:00:51] THE OTHER FIVE ARE ALL
[1:00:53] RESIDENTIAL.
[1:00:54] >>Michael Sheeley: THE BIGGEST
[1:00:56] BLOCK THAT WE SEE TO THE SOUTH
[1:00:58] OF THE GROUPING, YOU'RE NOW
[1:01:01] SPLITTING INTO TWO FOOTPRINTS?
[1:01:02] >> SO WHEN WE DROPPED DOWN THE
[1:01:04] OFFICE BUILDING FROM THE SECOND
[1:01:06] FLOOR TO THE GROUND FLOOR, IT
[1:01:07] STILL MAINTAINS 20,000 SQUARE
[1:01:08] FEET TOTAL, BUT TWO SEPARATE
[1:01:10] BUILDINGS, SO WE HAVE A NICE
[1:01:11] CORRIDOR IN THE MIDDLE.
[1:01:12] >>Michael Sheeley: GOTCHA.
[1:01:13] THANK YOU.
[1:01:16] >> THEN WE WENT INTO A LITTLE
[1:01:19] BIT OF THE CONCEPT DESIGN FOR
[1:01:22] THE BUILDING.
[1:01:23] AND THIS IS THE RENDERING OF THE
[1:01:25] CURRENT PROJECT THAT'S UNDER
[1:01:26] CONSTRUCTION HERE.
[1:01:27] THIS IS THE MAIN CORNER ON 41
[1:01:29] AND COCONUT ROAD.
[1:01:31] THESE ARE THE DOUBLE HEIGHT
[1:01:33] FEATURE RESTAURANTS THAT ARE
[1:01:35] RIGHT THERE.
[1:01:36] WE REALLY LOVE THE WAY THAT THIS
[1:01:38] KIND OF FACADE AND DESIGN IS
[1:01:40] SHAPING OUT.
[1:01:40] THOSE ARCHED WINDOWS, DOUBLE
[1:01:43] HEIGHT SPACE.
[1:01:44] MINIMUM 20-FOOT CLEAR WITHIN
[1:01:45] THOSE SPACES THAT WE REALLY HOPE
[1:01:47] TO GET SOME GREAT RESTAURANTS IN
[1:01:49] THERE.
[1:01:49] SO WE TOOK SOME INSPIRATION FROM
[1:01:52] THIS, THIS MAIN FEATURED CORNER,
[1:01:54] AND WE IMPLEMENTED THAT INTO THE
[1:01:57] GROCER AS A CONCEPT DESIGN.
[1:01:59] THIS IS THE VIEWPOINT FROM 41
[1:02:02] LOOKING AT THE GROCER BUILDING.
[1:02:04] OBVIOUSLY, THE BIG BLANK SPACE
[1:02:06] THERE WOULD HAVE A NAME PUT ON
[1:02:09] THERE OF THE GROCER, BUT THIS
[1:02:12] MAINTAINS THE LANDSCAPE BUFFER,
[1:02:14] WHICH IS -- IT'S TWO ROWS OF
[1:02:16] HEDGES, FOUR FOOT TALL AT
[1:02:18] PLANTING, AND THEN TREES BEYOND
[1:02:20] THAT LANDSCAPE HEDGE, AND WE HAD
[1:02:23] TO WORK WITH FPL.
[1:02:25] WE CAN'T DO CERTAIN TYPES OF
[1:02:27] TREES BECAUSE THE FPL LINES ARE
[1:02:30] THERE.
[1:02:30] THIS IS ALL THE APPROVED
[1:02:32] LANDSCAPE BUFFER THERE THAT ACT
[1:02:34] AS A GREAT BUFFER TO THE
[1:02:37] PARKING, BUT MAINTAIN VIEW
[1:02:39] CORRIDORS OF THE GROCER THERE.
[1:02:41] >>Kristin Jeannin: THERE ARE
[1:02:42] POWER LINES OVER THIS?
[1:02:44] >> THAT'S RIGHT.
[1:02:46] >>Kristin Jeannin: I MEAN, IT'S
[1:02:48] NICE TO HAVE THE BUFFER WIDTH,
[1:02:51] BUT IT'S STILL A PARKING LOT
[1:02:53] THAT NEEDS TO BE SCREENED.
[1:02:55] REALLY DOESN'T MEAN -- WIDTH
[1:02:57] REALLY DOESN'T MEAN ANYTHING
[1:02:58] WHEN IT COMES TO TRYING TO
[1:02:59] SCREEN A PARKING LOT.
[1:03:01] I THINK JUST KEEP THAT IN MIND.
[1:03:04] SORRY TO INTERJECT IN THE
[1:03:06] MIDDLE.
[1:03:06] >> NO, THAT'S FINE.
[1:03:07] >>Michael Sheeley: LOOKS GOOD.
[1:03:10] >> SO WHEN WE STARTED WORKING ON
[1:03:12] THIS REVISION TO THE SITE PLAN,
[1:03:14] WE MET WITH VILLAGE STAFF, AND
[1:03:17] THEY BROUGHT UP THEIR BIGGEST
[1:03:18] CONCERN WAS DUE TO SOME OF THE
[1:03:21] TRAFFIC CIRCULATION.
[1:03:22] SO THEIR BIGGEST CONCERN WAS
[1:03:24] VEHICLES ENTERING AT THE
[1:03:26] NORTHERN TRAFFIC LIGHT,
[1:03:28] VANDENBERG WAY, CIRCLING KIND OF
[1:03:30] ON THE WEST SIDE OF LYDEN AND
[1:03:33] THEN GO DIRECTLY IN FRONT OF THE
[1:03:37] GROCERY STORE.
[1:03:38] THEY BROUGHT THAT UP AS A
[1:03:39] CONCERN.
[1:03:39] THEY DON'T WANT PEOPLE ENTERING
[1:03:41] THE SITE HAVING TO GO THROUGH
[1:03:42] THE FRONT OF THE GROCERY STORE.
[1:03:44] WE REACHED BACK OUT TO DOVER,
[1:03:47] KOHL AND ALSO THE TRAFFIC
[1:03:49] ENGINEER PHERIN PIERCE WHO
[1:03:50] WORKED WITH US ON THE PROJECT.
[1:03:53] [PHONE RINGING]
[1:04:01] I HAVE IT IN THE SLIDE AS WELL
[1:04:03] BUT I WANTED TO READ A QUICK
[1:04:07] TRAFFIC AND THEN GO INTO A
[1:04:09] LITTLE MORE OF THE METHODOLOGY
[1:04:11] FROM PIERCE.
[1:04:12] VICTOR SAID I STRONGLY SUPPORT
[1:04:13] THE IDEA OF ROUTEING A STREET
[1:04:15] ALONG THE FRONT OF THE GROCERY
[1:04:16] STORE.
[1:04:17] IT SHOULD BE DESIGNED LIKE A
[1:04:18] REAL STREET, NOT A MERE FIRE
[1:04:20] LANE.
[1:04:20] IT SHOULD HAVE STREET TREES,
[1:04:22] LAMP POSTS, SIDEWALKS, DOORS AND
[1:04:25] WINDOWS OPENING TOWARDS IT AND
[1:04:27] CROSSWALKS.
[1:04:27] THIS WILL INTEGRATE THAT STREET
[1:04:30] WITH THE OVERALL CIRCULATION
[1:04:31] NETWORK THROUGH THE DEVELOPMENT.
[1:04:33] THE NETWORK WAS DESIGNED FOR
[1:04:36] PEDESTRIAN CONTINUITY AND LOW
[1:04:38] VEHICULAR SPEEDS TO CREATE A
[1:04:40] SAFE, WALKABLE ENVIRONMENT FOR
[1:04:42] BOTH VISITORS AND RESIDENTS.
[1:04:44] SO VICTOR IS IN FULL SUPPORT OF
[1:04:47] THIS AND HAVING THAT USE THERE.
[1:04:49] NO CONCERN WITH HAVING VEHICLES
[1:04:52] GOING IN FRONT OF THE GROCERY
[1:04:55] STORE.
[1:04:56] DIGGING INTO A LITTLE BIT MORE
[1:04:58] OF THE TRAFFIC ANALYSIS.
[1:05:00] SO THE FIRST THING PHERIN PIERCE
[1:05:02] NOTED, MOST OF THE PEOPLE
[1:05:04] TRAVELING THROUGH THE SITE WOULD
[1:05:06] BE FREQUENT VISITORS TO THE
[1:05:08] RESIDENTIAL UNITS, THE OFFICE,
[1:05:09] AND SOME OF THE RETAIL STORES.
[1:05:12] IT'S LIKELY THAT MANY OF THEM
[1:05:14] WILL KNOW THE OPTIMAL ROUTE TO
[1:05:16] GET TO WHERE THEY WANT TO GO.
[1:05:19] PEOPLE LIVING HERE, COMING FROM
[1:05:20] THE NORTH AND LIVE ON THE WEST
[1:05:22] SIDE OF THE SITE, THERE'S STILL
[1:05:24] AN ACCESS ROAD THAT GOES NORTH
[1:05:25] OF THE GROCERY STORE, SO THEY
[1:05:27] DON'T NEED TO GO IN FRONT OF THE
[1:05:29] GROCERY STORE.
[1:05:29] THEY ARE NOT GOING TO GO, RIGHT.
[1:05:32] IF IT IS A REALLY SLOW KIND OF
[1:05:34] AREA AND YOU'RE EXPECTING PEOPLE
[1:05:35] TO BE CROSSING, IF YOU ARE A
[1:05:37] RESIDENT COMING FROM THE NORTH,
[1:05:39] YOU'LL KIND OF SCOOT BEHIND THE
[1:05:41] GROCERY STORE AND GO TO THE
[1:05:42] RESIDENTIAL UNITS THERE.
[1:05:43] IF YOU ARE LIVING IN THE SOUTH
[1:05:45] PORTION OF THE SITE, YOU'LL GO
[1:05:47] IN PROBABLY TO THE MIDDLE OF THE
[1:05:48] SITE THERE AND BYPASS THE
[1:05:50] GROCERY OR YOU'LL GO DOWN TO
[1:05:51] COCONUT ROAD.
[1:05:52] SO REALLY THE MAJORITY OF THE
[1:05:54] TRAFFIC GOING IN AND OUT OF THE
[1:05:57] PROJECT IS ASSOCIATED WITH THE
[1:05:58] RESIDENTIAL UNITS.
[1:05:59] THEY ARE SAYING THAT THE
[1:06:02] MAJORITY OF THAT WOULD REALLY
[1:06:04] NOT -- NOT DRIVE IN FRONT OF THE
[1:06:07] GROCERY STORE.
[1:06:08] OBVIOUSLY, THE GROCERY STORE
[1:06:10] TRAFFIC ITSELF, THEY ARE GOING
[1:06:12] THERE INTENTIONALLY.
[1:06:13] SO IT REALLY JUST LEAVES A BIT
[1:06:17] OF THE OFFICE AND THE RETAIL
[1:06:20] VISITORS.
[1:06:20] AFTER LOOKING AT THE
[1:06:22] NUMBERS, PHERIN PIERCE MENTIONED
[1:06:23] GIVEN THE MULTIPLE ROUTES AROUND
[1:06:26] THE GROCERY STORE, THE NUMBER IS
[1:06:28] EXPECTED TO BE WITHIN THE RANGE
[1:06:31] OF ONE TO TWO NON-GROCERY STORE
[1:06:34] TRIPS EVERY MINUTE DURING THE
[1:06:36] PEAK HOURS, IN THE MORNING AND
[1:06:39] EVENING.
[1:06:39] YOU'RE TALKING EVERY 30 SECONDS
[1:06:42] TO 60 SECONDS, A CAR DRIVING
[1:06:45] PAST THERE.
[1:06:46] THEY REALLY DON'T FEEL LIKE IT
[1:06:47] IS A TRAFFIC OR PEDESTRIAN
[1:06:49] SAFETY CONCERN.
[1:06:49] THEN THEY ADDED A COUPLE OF
[1:06:52] CONCLUSIONS AND RECOMMENDATIONS
[1:06:53] TO ADD A RAISED CROSS WALK
[1:06:56] BETWEEN THE GROCERY STORE AND
[1:06:58] THE PARKING LOT, A HIGH
[1:07:01] VISIBILITY CROSS WALK AND ALSO
[1:07:03] ENSURE THE LIGHTING ILLUMINATES
[1:07:05] THE PATH OF TRAVEL FROM THE
[1:07:08] GROCERY STORE TO THE PARKING
[1:07:10] LOT.
[1:07:10] THIS IS GOING BACK INTO THE
[1:07:13] AMENDMENT REQUEST AGAIN TO ALLOW
[1:07:15] THAT COMMERCIAL SPACE BECAUSE
[1:07:16] PREVIOUSLY IT WAS JUST THE TOWN
[1:07:19] HOUSE AND RESIDENTIAL.
[1:07:20] NOW TO MAKE IT THE PARKING LOT
[1:07:22] FOR THE GROCER, IT NEEDS TO HAVE
[1:07:24] A COMMERCIAL ASPECT TO IT.
[1:07:25] AND THEN MAINTAINING THE MAXIMUM
[1:07:29] 45 FEET HEIGHT BUT REMOVING THE
[1:07:33] THREE-STORY LIMITATION.
[1:07:35] THIS IS GOING -- IT'S THAT TOP
[1:07:36] RIGHT BLOCK THERE THAT WE WOULD
[1:07:38] HAVE TO ADD.
[1:07:39] YOU SEE IT SAYS TOWN HOUSE
[1:07:42] MULTIFAMILY, WE WOULD ADD
[1:07:44] COMMERCIAL TO THAT, THAT
[1:07:46] NORTHEAST BLOCK THERE.
[1:07:48] THIS IS JUST A KIND OF OVERALL
[1:07:51] AERIAL OF THE ORIGINAL PATTERN
[1:07:53] BOOK RENDERING SHOWING THE TOWN
[1:07:55] HOUSES THERE.
[1:07:56] THAT WAS ACTUALLY A THREE-STORY
[1:07:58] OFFICE BUILDING AT THAT TIME, A
[1:08:01] GARAGE BACK THERE.
[1:08:02] THIS IS KIND OF THE UPDATED
[1:08:06] CONCEPT RENDERING OF THE PARKING
[1:08:08] LOT AND THE GROCERY STORE AND
[1:08:12] THEN THE OFFICE BUILDING
[1:08:14] DROPPING DOWN TO ONE.
[1:08:16] THE SECOND MOIFERTION
[1:08:18] MODIFICATION IS TO THE NUMBER OF
[1:08:20] STORIES.
[1:08:21] 45 FEET AS APPROVED ON BASICALLY
[1:08:23] ALL OF THE WESTERN BLOCKS AND
[1:08:25] THE NORTHERN BLOCKS.
[1:08:26] 45 FEET WAS THE HEIGHT, BUT THE
[1:08:29] THREE STORIES WAS IN THERE THAT
[1:08:32] WE'RE ASKING TO REMOVE.
[1:08:34] THIS WAS THE ORIGINAL PATTERN
[1:08:37] BOOK.
[1:08:38] AS PART OF THE ZONING SHOWING
[1:08:40] THE 45 FEET HEIGHT FOR ALL THE
[1:08:44] WESTERN AND NORTHERN PORTIONS
[1:08:46] AND REALLY THE HIGHER DENSITY,
[1:08:48] 60 FEET ASSOCIATED WITH THAT
[1:08:50] NORTHEAST CORNER THERE, A LITTLE
[1:08:53] BIT OF TALLER DENSITY OR TALLER
[1:08:56] HEIGHT FOR THE HOTEL RIGHT IN
[1:08:59] THE MIDDLE.
[1:08:59] LASTLY, I JUST KIND OF WANT TO
[1:09:02] SHOW A DEVELOPMENT PROGRAM
[1:09:03] BETWEEN THE ORIGINAL -- THIS IS
[1:09:04] THE ORIGINAL PATTERN BOOK AND
[1:09:06] THEN WE HAVE THE SAME
[1:09:07] DEVELOPMENT PROGRAM FOR THE NEW
[1:09:09] KIND OF MIX OF USES.
[1:09:11] IT REALLY MAINTAINS THE
[1:09:13] INTENTION OF THE PROJECT, WHICH
[1:09:15] WAS REALLY TO HAVE A MIXED-USE
[1:09:18] RETAIL CORRIDOR ON THAT CURVED
[1:09:21] ROAD AT THE MAIN INTERSECTION TO
[1:09:24] HAVE THOSE FOCAL RESTAURANTS AND
[1:09:26] THEN RESTAURANT OR COMMERCIAL
[1:09:28] SPACE ALONG THE GROUND FLOOR OF
[1:09:31] THAT KIND OF DIAGONAL
[1:09:33] PEDESTRIAN-ONLY STREET.
[1:09:34] AND THEN THROUGH THE MAIN
[1:09:37] ENTRANCE WAY, KIND OF IN THE
[1:09:40] MIDDLE OF THE PROJECT HERE,
[1:09:42] HAVING THE RETAIL USES FOCUSED
[1:09:44] ON THAT CORRIDOR AS WELL.
[1:09:47] OBVIOUSLY, ALL OF THE WESTERN
[1:09:50] PROPERTIES WERE ALL RESIDENTIAL
[1:09:52] AND ARE STILL ALL RESIDENTIAL,
[1:09:55] SO YOU SEE HERE KIND OF THE
[1:09:59] UPDATED DEVELOPMENT PROGRAMMING,
[1:10:01] KEEPING ALL OF THAT RETAIL ON
[1:10:05] THE FOCAL CORNER, THAT UP
[1:10:08] PEDESTRIAN ONLY AND THEN ON THAT
[1:10:11] MAIN ACCESS INTO THE PROPERTY.
[1:10:14] ALEXIS WILL CLOSE OUT WITH A
[1:10:16] COUPLE OF NOTES AND THEN WE
[1:10:18] WOULD LOVE TO OPEN IT UP FOR
[1:10:20] QUESTIONS.
[1:10:20] >>Michael Sheeley: THANK YOU.
[1:10:23] >> THANK YOU.
[1:10:24] IT'S A PLEASURE TO BE BACK
[1:10:26] BEFORE YOU WITH THIS PROJECT.
[1:10:27] I THINK IT'S COMING OUT OF THE
[1:10:29] GROUND AND COMING TO FRUITION, I
[1:10:31] THINK MEETING THE INTENT OF YOUR
[1:10:33] COMP PLAN AND LDC IN TERMS OF
[1:10:35] BEING A VIABLE VILLAGE CENTER
[1:10:36] WITH INTEGRATED MIXED USE, ALL
[1:10:37] THE THINGS WE HAD PROMISED.
[1:10:39] THESE CHANGES WILL JUST ALLOW,
[1:10:41] AGAIN, FOR THE HEIGHT TO BE
[1:10:43] MAINTAINED.
[1:10:44] JUST HAVE A FOUR STORY WITHIN
[1:10:46] THE SAME HEIGHT FOOTPRINT.
[1:10:47] SO THERE WILL BE NO PHYSICAL
[1:10:49] IMPACT TO THE NEIGHBORS.
[1:10:51] THE AREA IS ALSO WELL BUFFERED
[1:10:53] WITH THE PRESERVE AS YOU CAN SEE
[1:10:54] THROUGH THE VISUALS.
[1:10:55] PROBABLY MORE SIGNIFICANT CHANGE
[1:10:57] IS BRINGING THIS GROCER THAT'S
[1:10:58] HIGHLY DEMANDED IN THIS AREA.
[1:11:00] I THINK IT WILL BE A GREAT FIT
[1:11:03] NOT ONLY FOR THE FUTURE
[1:11:05] RESIDENTS AND ALLOW THEM TO BE
[1:11:07] ABLE TO WALK TO GET THEIR GOODS
[1:11:10] AND SERVICES LIKE THAT, BUT ALSO
[1:11:12] SERVE THE RESIDENTIAL COMING
[1:11:14] ONLINE ON COCONUT ROAD AND THE
[1:11:16] SURROUNDING AREA.
[1:11:17] LOOKING FORWARD TO YOUR COMMENTS
[1:11:18] ON IT.
[1:11:19] I KIND OF HEARD FEEDBACK ON
[1:11:21] MAYBE WORKING ON THAT BUFFER
[1:11:22] THAT'S GOING TO BE IN FRONT OF
[1:11:24] THE GROCERY STORE TO DO A BETTER
[1:11:26] JOB OF SCREENING THE PARKING,
[1:11:27] WHICH WE CAN CERTAINLY LOOK AT.
[1:11:29] >>Kristin Jeannin: PROBABLY
[1:11:30] BUTTON WOODS THAT THE LANDSCAPE
[1:11:32] ARCHITECT WILL PUT IN THERE.
[1:11:34] MAYBE A STAGGERED, MAYBE A
[1:11:36] LITTLE MORE DENSITY THAN THE
[1:11:38] CODE REQUIRES BECAUSE YOU CAN'T
[1:11:40] GO WITH ANY HEIGHT THERE.
[1:11:42] >> OUR INITIAL THOUGHT WAS TO
[1:11:44] KIND OF GROUP THEM TOGETHER TO
[1:11:46] ALLOW SOME VIEW CORRIDORS OF THE
[1:11:48] GROCERY STORE.
[1:11:49] >>Kristin Jeannin: TOWARDS THE
[1:11:53] SIGNAGE OF THE BUILDING, SURE.
[1:11:58] I'M A LITTLE BIT CONCERNED, YOU
[1:12:01] SAW ME CRINGE A LITTLE BIT
[1:12:03] BECAUSE YOUR RENDERINGS SHOWED
[1:12:04] LIKE A DISTANT VIEW OF THE
[1:12:07] CHANGE THAT YOU'RE PROPOSING
[1:12:08] INSTEAD OF SHOWING US REALLY HOW
[1:12:10] IT'S GOING TO LOOK, WHAT YOU ARE
[1:12:13] PROPOSING THE GROCERY STORE.
[1:12:14] I DON'T HAVE A PROBLEM WITH THE
[1:12:16] GROCERY STORE.
[1:12:16] I THINK, OF COURSE, IT'S GREAT.
[1:12:19] LIKE THE COMMUNITY WILL BE ABLE
[1:12:24] TO -- YOU DIDN'T TALK MUCH ABOUT
[1:12:28] WALKING THERE.
[1:12:30] I WOULD WANT TO HAVE THAT BE
[1:12:33] PART OF THE DISCUSSION MOVING
[1:12:36] FORWARD.
[1:12:36] FROM THE PEOPLE THAT LIVE HERE.
[1:12:39] YOU TALKED ABOUT THE GRAPHIC.
[1:12:44] THERE SHOULD BE A STRONG
[1:12:48] PROCLIVITY FOR WANTING PEOPLE TO
[1:12:52] WALK TO THE GROCERY STORE.
[1:12:55] VICTOR DOVER'S RECOMMENDATION
[1:12:57] WAS VERY BEAUTIFUL.
[1:12:59] AND WHAT I SAW LOOKED MORE LIKE
[1:13:02] A PARKING LOT AND A GROCERY
[1:13:04] STORE.
[1:13:05] THE REQUIRED TREES DRAWN BIG.
[1:13:10] WHAT I WOULD GET EXCITED ABOUT
[1:13:12] WOULD BE TO SEE SOME SHADED
[1:13:15] WALKWAYS FROM THE PARKING.
[1:13:16] SOME SHADED WALKWAYS FROM THE
[1:13:19] RESIDENTIAL AREAS.
[1:13:19] I DON'T KNOW HOW YOUR PARKING
[1:13:22] CALCULATIONS ARE COMING.
[1:13:23] I KNOW THOSE COME INTO PLAY A
[1:13:26] LOT.
[1:13:27] IF YOU DON'T HAVE ENOUGH
[1:13:30] PARKING, THEN BEING CREATIVE
[1:13:32] WITH LARGER TREES OR SOMETHING
[1:13:35] OF THAT NATURE.
[1:13:37] YOU MIGHT HAVE GONE OVER THIS,
[1:13:40] BUT DID YOU TALK ABOUT TRAFFIC
[1:13:43] CONCERNS.
[1:13:43] IS IT ANY DIFFERENT WITH THE
[1:13:47] GROCERY STORE?
[1:13:48] DID YOU HAVE -- ARE THERE ANY
[1:13:50] ISSUES WITH THAT, WITH TRAFFIC
[1:13:52] GETTING IMPACTED?
[1:13:53] >> WAY BACK WHEN WHEN WE FIRST
[1:13:55] GOT INVOLVED IN THIS, WE WERE
[1:13:57] TRYING TO GET A GROCERY STORE IN
[1:13:59] HERE.
[1:13:59] WE INCLUDED IN OUR INITIAL
[1:14:02] TRAFFIC CALCULATION, 40,000,
[1:14:03] 45,000 SQUARE FOOT GROCERY
[1:14:05] STORE.
[1:14:06] WE PULLED THAT BACK.
[1:14:09] BUT WE'RE DOING EVERYTHING THAT
[1:14:11] WE CAN, EVERY RECOMMENDATION
[1:14:13] THAT WAS PUT FORTH ON TRAFFIC
[1:14:16] AROUND THE PROJECT WE'RE
[1:14:18] IMPLEMENTING.
[1:14:18] I'LL GO THROUGH REAL QUICKLY.
[1:14:20] >> I WANT TO PUT ON THE RECORD
[1:14:22] ONE THING.
[1:14:22] WE'RE NOT INCREASING OUR
[1:14:24] COMMERCIAL SQUARE FOOTAGE, SO
[1:14:25] THE TRAFFIC STUDIES THAT WENT
[1:14:27] WITH THE ORIGINAL ZONING FULLY
[1:14:29] ANTICIPATED THE TRIPS FROM THIS
[1:14:31] USE.
[1:14:31] >>Kristin Jeannin: FROM A
[1:14:32] GROCERY USE.
[1:14:33] >> YES.
[1:14:34] >>Kristin Jeannin: GREAT.
[1:14:34] >> WE'RE STAYING WITHIN THE
[1:14:36] MAXIMUM SQUARE FOOTAGES
[1:14:37] ALREADY --
[1:14:39] >>Kristin Jeannin: I THINK THAT
[1:14:40] THE USE OF A GROCERY STORE IS A
[1:14:43] LITTLE DIFFERENT THAN IF IT WAS
[1:14:45] AN OFFICE BUILDING.
[1:14:46] AS LONG AS SOMEBODY THAT'S A
[1:14:47] PROFESSIONAL IS LOOKING AT
[1:14:49] THAT --
[1:14:49] [ LAUGHTER ]
[1:14:50] >> BY THE WAY, OBVIOUSLY, ON
[1:14:53] COCONUT ROAD, WE'RE DOING THE
[1:14:55] ROUNDABOUT.
[1:14:56] ON U.S. 41 AT COCONUT, MAKING
[1:14:59] THE LEFT-HAND TURN ONTO COCONUT,
[1:15:01] WE'RE EXTENDING THAT TURN LANE,
[1:15:03] EVEN THOUGH -- NOT ALL THAT
[1:15:06] TRAFFIC IS ASSOCIATED WITH OUR
[1:15:08] PROJECT, GOING NORTH INTO THE
[1:15:11] NORTHERN ACCESS POINT OF OUR
[1:15:13] PROJECT.
[1:15:14] WE'RE DOING THE NORTH-BOUND LEFT
[1:15:16] INTO THE PROJECT, SOUTHBOUND
[1:15:18] RIGHT IN, RIGHT OUT.
[1:15:20] AND THEN IN THE MIDDLE OF THE
[1:15:24] PROJECT, THE RIGHT-IN,
[1:15:25] RIGHT-OUT, BOTH WITH DECEL LANES
[1:15:28] THERE.
[1:15:28] IT'S A LOT OF EXPENSE AND TIME
[1:15:30] THAT WE ARE DOING THAT.
[1:15:31] THAT NORTHERN LEFT INTO THE SITE
[1:15:33] TO KIND OF ACCOMMODATE A LOT OF
[1:15:35] THE COMMUNITY NEEDS THERE.
[1:15:36] WHICH IS NOT A PART OF OUR
[1:15:40] ORIGINAL APPROVALS, BY THE WAY.
[1:15:42] >>Kristin Jeannin: THAT'S WHAT I
[1:15:43] HAD.
[1:15:43] >>Michael Sheeley: ANY OTHER
[1:15:44] QUESTIONS OR COMMENTS?
[1:15:46] >>Dan Williams: I MAY BE ADVANCE
[1:15:48] OF WHERE WE SHOULD BE, BUT HAS
[1:15:51] THE FIRE DEPARTMENT REVIEWED
[1:15:53] THESE AND CONCURS THAT IT'S
[1:15:55] QUITE ACCESSIBLE?
[1:15:56] >> WITH THIS GROCER, NO.
[1:15:59] REALLY, WE HAVE THIS SITE PLAN
[1:16:00] AND THE CONCEPT RENDERINGS.
[1:16:02] THOSE ARE GOOD ENOUGH TO SHOW
[1:16:03] YOU GUYS WHAT THIS THING COULD
[1:16:04] LOOK LIKE.
[1:16:05] THIS WAS THE FIRST STEP TO
[1:16:10] REALLY THEN KICK OFF DESIGN FROM
[1:16:14] HERE.
[1:16:15] >>James Tatooles: I JUST WONDER
[1:16:17] HOW THE CONGRUITY OF THIS WHOLE
[1:16:20] PROJECT IS ON THE PERIMETER AND
[1:16:23] ALL OF A SUDDEN YOU HAVE A
[1:16:26] GROCERY STORE JOGGING IN THERE.
[1:16:29] I THINK THAT THE ELEVATION OF
[1:16:32] THE GROCERY STORE AND THE
[1:16:34] LANDSCAPING ARE GOING TO BE VERY
[1:16:37] IMPORTANT ELEMENTS.
[1:16:38] >>Kristin Jeannin: IT SHOWS --
[1:16:39] YOU TALKED ABOUT THIS STREET
[1:16:42] FRONTAGE CORRIDOR AS THOUGH IT
[1:16:44] WAS A CONCERN, BUT I DO THINK IT
[1:16:47] IS A STRENGTH, BUT IT'S NOT
[1:16:50] DEVELOPED YET, LIKE YOU'RE
[1:16:52] SAYING.
[1:16:52] THAT'S MOVING FORWARD, IT COULD
[1:16:54] REALLY STRENGTHEN THAT AS PART
[1:16:56] OF THE PROJECT INSTEAD OF
[1:16:58] FEELING LIKE, WHICH IT KIND OF
[1:17:01] IS AN AFTERTHOUGHT, RIGHT?
[1:17:03] >> THE STREET IN FRONT OF THE
[1:17:04] GROCERY STORE LEADING INTO THE
[1:17:06] PROJECT.
[1:17:06] >>Kristin Jeannin: YES.
[1:17:07] >> OKAY.
[1:17:09] >>Michael Sheeley: AL, COMMENTS?
[1:17:12] >>Al Paivandy: NO.
[1:17:13] I THINK EVERYBODY ELSE COVERED
[1:17:16] IT.
[1:17:16] I AM CONCERNED BECAUSE I'M
[1:17:18] THINKING IF I'M DRIVING DOWN
[1:17:20] THERE, I'M JUST GOING TO PULL IN
[1:17:23] WHERE THE GROCERY STORE IS.
[1:17:25] AND THAT'S GOING TO BE THE MOST
[1:17:28] CROWDED SECTION OF THE ROAD FROM
[1:17:30] 41 DIRECTLY IN.
[1:17:31] I DON'T THINK I WOULD EVER DRIVE
[1:17:35] THROUGH THAT LIGHT -- AND GET
[1:17:38] BACK IN THERE.
[1:17:40] IT'S JUST A CONCERN GOING IN AND
[1:17:42] OUT OF THERE AND ENDING UP IN
[1:17:44] FRONT OF THE GROCERY STORE --
[1:17:45] >>Michael Sheeley: I THINK IT
[1:17:46] DEPENDS ON WHERE YOU'RE GOING.
[1:17:47] IF YOU ARE GOING TO GROCERY,
[1:17:49] THAT'S ONE THING.
[1:17:49] IF YOU LIVE THERE, YOU'LL KNOW
[1:17:51] ANOTHER PLACE THAT'S CLOSER.
[1:17:53] >>Al Paivandy: TRAFFIC GOING TO
[1:17:55] GET QUITE CONGESTED ON THAT
[1:17:58] CORNER IN ADDITION TO, IF I'M
[1:18:01] LIVING THERE, WHICH ALREADY
[1:18:03] MOVED INTO THE ASSISTED LIVING.
[1:18:05] BUT IF THE BUS BRINGS ME THERE,
[1:18:08] IT WOULD BE GOOD.
[1:18:10] JUST GOING IN THERE WITH THE
[1:18:12] PARKING LOT AND THE MOVEMENT
[1:18:14] JUST LIKE WALMART OR ANY OTHER
[1:18:17] STORE THAT IS THERE IS A
[1:18:19] DIFFICULT IN AND OUT DIRECTLY
[1:18:21] FROM 41.
[1:18:22] >>James Tatooles: I THINK WHAT
[1:18:24] YOU'RE TALKING ABOUT BEARS MERIT
[1:18:27] TO THINKING ABOUT.
[1:18:28] BECAUSE WHAT YOU'VE GOT, THERE'S
[1:18:30] NO PLACE AROUND HERE THAT I KNOW
[1:18:32] OF THAT YOU'VE GOT A GROCERY
[1:18:35] STORE ENTRANCE COMING OFF OF A
[1:18:37] MAIN STREET.
[1:18:37] THAT'S VERY UNUSUAL HERE.
[1:18:43] COMPLETELY AN -- SITUATION.
[1:18:45] THE OTHER PART IS THAT USING
[1:18:48] THAT ACCESS FROM THE NORTH GOING
[1:18:50] SOUTH TO GET INTO THIS PROJECT,
[1:18:53] YOU JUST GOT A BLOCKADE RIGHT IN
[1:18:56] THE WAY AND THAT IS THE PARKING
[1:19:00] LOT OF THE GROCERY STORE.
[1:19:02] THERE'S NO ACCESS FROM THE
[1:19:04] NORTH.
[1:19:04] YOU'VE GOT TO GO ALL THE WAY
[1:19:06] DOWN PAST THE GROCERY STORE.
[1:19:07] I THINK THERE IS A BIT OF
[1:19:11] LEARNING OF TRAFFIC PATTERNS
[1:19:12] AROUND HERE.
[1:19:13] IT'S CONVOLUTED A LITTLE BIT.
[1:19:17] >>Al Paivandy: IF IT WAS ME,
[1:19:18] JUST THINKING ABOUT THIS, I'M
[1:19:20] GOING TO HAVE TO SLEEP ON IT A
[1:19:22] FEW NIGHTS BEFORE I CAN COME UP
[1:19:24] WITH THAT.
[1:19:25] BEFORE YOU HAD A PROJECT THAT
[1:19:27] WAS QUITE WELL PUT TOGETHER WITH
[1:19:30] OFFICES THERE AND THE
[1:19:32] PROFESSIONAL WORKING AND NOT IN
[1:19:34] AND OUT AS MUCH.
[1:19:36] THIS ONE, YOU JUST ADDED A
[1:19:39] DIFFERENT ELEMENT IN A CORNER
[1:19:41] THAT I'M NOT SURE HOW IT GOES
[1:19:45] WITH ALL THE COMMUNITIES AND
[1:19:47] OFFICES AND SHOPS AND GREAT
[1:19:50] RESTAURANT ON ONE CORNER AND
[1:19:52] THEN A SHOPPING CENTER, GROCERY
[1:19:54] STORE ATTACHED TO THIS AND A LOT
[1:19:58] OF PEOPLE WILL BE RUNNING IN
[1:20:01] THERE AS I SAID, JUST GOING TO
[1:20:04] HAVE TO SLEEP ON IT.
[1:20:07] AT MY AGE, WHO KNOWS HOW LONG.
[1:20:09] >>Kristin Jeannin: I THINK THE
[1:20:10] REAL DESIGN CHALLENGE IS GOING
[1:20:12] TO BE MAKING IT REALLY FEEL
[1:20:13] INTEGRATED AT THIS POINT.
[1:20:15] >>Michael Sheeley: I THINK SO
[1:20:17] SO, YEAH.
[1:20:18] >>James Tatooles: I AGREE.
[1:20:21] YOU HAVE A GROCERY STORE, THAT'S
[1:20:23] NOT TIED IN I WOULD THINK FROM A
[1:20:27] COMFORTABLE FEELING THAT IT TIES
[1:20:29] INTO THE REST OF THE PROJECT.
[1:20:31] >>Al Paivandy: THAT ENVIRONMENT
[1:20:32] YOU HAD BEFORE.
[1:20:33] >>James Tatooles: IT DOESN'T
[1:20:34] SEEM LIKE IT IS CONGRUOUS WITH
[1:20:36] THE REST OF THE PROJECT.
[1:20:38] >>Kristin Jeannin: AS A PUBLIC
[1:20:40] INFORMATION MEETING, THE USE IS
[1:20:41] ACCEPTABLE, RIGHT?
[1:20:42] WITH THE PROJECT ITSELF, I THINK
[1:20:43] THAT WOULD STRENGTHEN IT IF WE
[1:20:45] CAN MAKE IT PART OF THE FAMILY.
[1:20:47] >>Michael Sheeley: MY CONCERN IS
[1:20:48] THAT MAIN DRIVE THAT COMES, YOU
[1:20:50] COME RIGHT IN FRONT OF THE
[1:20:51] GROCERY STORE TO GET IN.
[1:20:53] WE ALL KNOW WHAT IT'S LIKE
[1:20:54] DRIVING IN FRONT OF PUBLIX AND
[1:20:56] YOU GO FIVE MILES AN HOUR AND
[1:20:58] STOP AND PEOPLE WALKING AND YOU
[1:20:59] STOP AGAIN.
[1:21:00] IT'S REALLY NOT A GOOD WAY TO
[1:21:02] ENTER THE SITE.
[1:21:03] DID YOU CONSIDER A PLAN WITH THE
[1:21:06] BACK OF THE GROCERY STORE
[1:21:09] TOWARDS 41, REVERSING THIS PLAN
[1:21:11] AND HAVING THE FRONT OF THE
[1:21:14] STORE FACING INWARD?
[1:21:16] >>James Tatooles: THAT DEFEATS
[1:21:17] THE GROCERY STORE MARKETING.
[1:21:19] >>Michael Sheeley: LOOK AT
[1:21:21] SPROUTS, IT'S -- MAYBE THERE
[1:21:23] WOULD BE A WAY TO THEN MAINTAIN
[1:21:26] A STREET WALL AND MAYBE REWORK
[1:21:29] THE CIRCULATION IN SOME FASHION
[1:21:31] SO THAT'S NOT THE MAIN
[1:21:33] CIRCULATION RIGHT IN FRONT OF
[1:21:36] THE STORE.
[1:21:37] JUST A THOUGHT.
[1:21:38] >> WE DID ENTERTAIN THAT.
[1:21:40] IT DID PUT LIKE THE LOADING DOCK
[1:21:43] OF THE STORE ALONG 41.
[1:21:45] >>Michael Sheeley: THAT'S
[1:21:46] PROBLEMATIC, YEAH.
[1:21:47] >> IT STILL HAD THE PARKING ON
[1:21:49] THE WEST SIDE OF THE ROAD.
[1:21:50] IT WAS STILL KIND OF A SIMILAR
[1:21:53] PEDESTRIAN EXPERIENCE.
[1:21:54] AND WE KIND OF HAVE THE
[1:21:56] FRAMEWORK OF THESE ROAD NETWORKS
[1:21:58] ALREADY BUILT OUT.
[1:21:59] THE PARK IS REMAINING ALONG 41,
[1:22:01] WHICH IS A KEY ELEMENT FROM
[1:22:03] DOVER AND COLE, BUT DOVER AND
[1:22:05] COLE.
[1:22:06] WE THOUGHT THIS WAS A MORE
[1:22:08] ATTRACTIVE OPTION THAN HAVING
[1:22:09] BACK OF HOUSE FRONTING 41.
[1:22:10] >>Michael Sheeley: I THINK WHAT
[1:22:13] YOU'RE HEARING FROM US IS MAYBE
[1:22:15] IT NEEDS MORE REVIEW, MORE
[1:22:17] DESIGN, MORE CONSIDERATION.
[1:22:19] >>James Tatooles: IT JUST FEELS
[1:22:20] UNCOMFORTABLE I THINK IS THE WAY
[1:22:21] TO SAY IT.
[1:22:22] JUST UNCOMFORTABLE.
[1:22:26] >> I THINK WITH IMPROVED VISUALS
[1:22:27] AND BRINGING BACK THE PATTERN
[1:22:29] BOOK IN THE ENTIRETY AND WALKING
[1:22:31] YOU THROUGH HOW IT FITS IN, WHEN
[1:22:33] YOU THINK ABOUT INTRODUCING THIS
[1:22:35] USE WITH ALMOST 600 DWELLING
[1:22:37] UNITS, YOU'LL BE ABLE TO ACCESS
[1:22:39] THIS WITHOUT GETTING ON 41 FROM
[1:22:41] SEVERAL OTHER COMMUNITIES, I
[1:22:42] THINK THIS COULD BE A GREAT
[1:22:44] THING IN HELPING CIRCULATION IN
[1:22:45] THE AREA.
[1:22:46] I THINK SHOWING YOU A
[1:22:48] PEDESTRIAN -- OF HOW PEOPLE WILL
[1:22:50] GET THERE WITHOUT COMING BY CAR
[1:22:52] WILL HELP AT THE NEXT STAGE OF
[1:22:55] THIS.
[1:22:55] >>Kristin Jeannin: IT'S NOT JUST
[1:22:58] THERE ARE SIDEWALKS, BUT --
[1:23:02] YEAH, IT'S ARCHITECTURALLY
[1:23:04] PLEASING, ENVIRONMENTALLY
[1:23:05] PLEASING APPROACH THAT IS
[1:23:07] CONSISTENT WITH THE REST OF YOUR
[1:23:11] PROJECT.
[1:23:11] >> THANK YOU.
[1:23:12] >>Michael Sheeley: THANK YOU.
[1:23:14] THANKS VERY MUCH.
[1:23:15] >> THANK YOU.
[1:23:16] >>Michael Sheeley: ANY PUBLIC
[1:23:17] COMMENT, TAMMY?
[1:23:18] ANY CARDS?
[1:23:19] >>Tammy Duran: NO, NOTHING.
[1:23:20] >>Michael Sheeley: ANYONE HERE
[1:23:21] WISH TO SPEAK ON THIS PROJECT?
[1:23:24] THANK YOU VERY MUCH FOR YOUR
[1:23:27] PRESENTATION.
[1:23:28] NEXT ON THE AGENDA IS PUBLIC
[1:23:31] INPUT.
[1:23:31] ANYBODY IN THE AUDIENCE HAVE
[1:23:33] ANYTHING ELSE TO SAY REGARDING
[1:23:35] ANYTHING WITH THE VILLAGE OF
[1:23:36] ESTERO?
[1:23:37] ANYBODY?
[1:23:38] NO.
[1:23:38] OKAY.
[1:23:40] NEXT MEETING IS OCTOBER 20,
[1:23:43] 2026.
[1:23:44] NEXT MONTH.
[1:23:44] MOTION TO ADJOURN.
[1:23:47] ANYBODY?
[1:23:48] >>James Tatooles: I'LL MAKE A
[1:23:49] MOTION TO ADJOURN.
[1:23:50] >>Al Paivandy: SECOND.
[1:23:50] >>Michael Sheeley: SO MOVED.
[1:23:51] THANK YOU.
[1:23:52] [ SOUNDING GAVEL ]