We will now begin the meeting; please
[0:01]
stand for the oath.
[0:06]
I pledge allegiance to the flag of the
[0:08]
United States of America and to the
[0:10]
republic for which it stands, one nation
[0:13]
under God, indivisible, with liberty and
[0:15]
justice for all.
[0:20]
Very good. Thank you all. I think the
[0:23]
first item on the agenda is to
[0:24]
say, let's go Red Sox! Very good.
[0:32]
I object.
[0:36]
Uh, any amendments to the agenda?
[0:38]
I have an amendment on your packages.
[0:42]
I included a letter titled with "coin"
[0:46]
from August. I tried to get some
[0:50]
other quotes, but I ended up
[0:52]
with only this one. And this is for the
[0:55]
MERP grant for the police department porch
[0:57]
. So I hope you will
[1:00]
review it and approve it.
[1:03]
Uh, okay. I will make a motion to
[1:07]
add the approval of expenses for
[1:11]
the ramp and rest area as item E in
[1:15]
new business. Do I have a second
[1:20]
motion? I second that. Is everyone in favor
[1:25]
?
[1:25]
Yes. It's been added. Very good.
[1:31]
Approval of the minutes of September 15 and 16
[1:34]
. I will make a motion to
[1:41]
approve the minutes from our
[1:44]
previous meetings on September 15th and 16th,
[1:46]
respectively.
[1:49]
I second the meeting. Can we
[1:51]
separate those motions?
[1:53]
Oh, yes, absolutely. I will
[1:55]
first make a motion to approve our
[1:57]
minutes from the meeting of
[1:59]
September 15, 2026.
[2:01]
I second. Is
[2:03]
everyone in favor?
[2:05]
Yes.
[2:06]
I will abstain.
[2:10]
I was not present. And I will make another
[2:14]
motion to approve our minutes
[2:17]
of September 16, 2026. Do
[2:23]
I have a second motion? I second
[2:26]
that too. Is
[2:30]
everyone in favor?
[2:31]
Yes. I'll
[2:33]
abstain from that one too. I
[2:35]
wasn't present at that one. Yes, I was there on
[2:37]
the 15th. For the record. I was going
[2:39]
to say that they're also
[2:41]
welcome to...
[2:44]
I thought it was funny because it
[2:46]
reminds me of you.
[2:48]
I was there on the 15th.
[2:51]
Very good. Reports from
[2:53]
department heads.
[2:54]
Clear. So, Bill, do you want to
[2:57]
start?
[2:58]
Clear. I'll start with the
[3:00]
police department. The
[3:01]
police department had...In the last two
[3:05]
weeks we had four arrests. One
[3:07]
for one person, one for
[3:08]
aggravated assault with recommendation of
[3:10]
violent release, and one for simple assault
[3:12]
. We wrote 54 traffic tickets, 15
[3:14]
written warnings, and one
[3:17]
parking violation. We had two
[3:18]
car accidents. We took
[3:20]
23 fingerprints of
[3:22]
civilians. I gave them a summary of what
[3:25]
we did in the last two weeks and
[3:28]
we had 122 service calls. We
[3:31]
have 4539 so far this year.
[3:39]
Very good. In addition, our
[3:42]
water and wastewater department, whose heads
[3:44]
are here tonight, has been
[3:45]
conducting routine tests and everything
[3:47]
is within expected ranges.
[3:50]
The water department is
[3:52]
preparing for hydrant cleaning
[3:53]
in October. Regarding wastewater.
[3:56]
Carrie is here to help us with
[3:59]
the Oil and Tanner report. Also,
[4:02]
Rutland has stopped receiving sludge, did they
[4:05]
give us an update? 6
[4:08]
to 8 weeks?
[4:09]
Probably 8 weeks, until January.
[4:11]
So we'll have to transport
[4:14]
our sludge to Schenectady. That
[4:16]
will increase transportation costs.
[4:20]
Just so you know what's going to happen
[4:23]
with our budget.
[4:26]
Fortunately, we have that connection
[4:28]
with Schenectady. I am very grateful
[4:32]
to Carrie for that and for finding a
[4:35]
viable solution to this problem. In
[4:38]
Public Works, we are announcing the
[4:40]
vacancy for the position of CDL. We
[4:43]
currently have four applicants. Nate and
[4:45]
I will review them this week. The
[4:47]
rest of the staff are finishing the
[4:49]
trenches on Bigalow Road. The work on
[4:52]
the road shoulders was completed today on Sheldon
[4:54]
Road, Cemetery Street and Swamp Road. Uh,
[4:59]
no, that one wasn't there.
[5:01]
Ongoing equipment repairs,
[5:02]
road leveling, garbage collection, and
[5:04]
tree work around
[5:05]
municipal buildings. We're trying
[5:07]
to take care of some things in the
[5:09]
back. We took care of
[5:12]
some trees on the sides and others at
[5:14]
the back, doing a general cleaning,
[5:17]
but there are still some trees at the back of the
[5:20]
building that serve as an entrance for
[5:23]
squirrels. So we're trying to
[5:26]
fix that a little bit. I hope everyone
[5:30]
has noticed that the park fountain is
[5:32]
working again. That was very good
[5:35]
. It looks great. All the mulch has already been placed
[5:37]
around it. So, yes, I'm
[5:40]
glad it's finally ready. We are
[5:44]
under pressure to sign the
[5:46]
MER grant contract. As you know,
[5:50]
we had in mind the deadline of
[5:53]
December 31st; That's what they
[5:56]
told us until last Thursday or Friday
[5:59]
. We were informed that yes,
[6:03]
we have until then to spend the
[6:05]
money, but the contracts must be
[6:06]
signed by September 30th. That's why
[6:11]
I was trying to get more
[6:13]
bids for the porch, but I haven't
[6:15]
received any. So we're going to move
[6:18]
forward with that so we can
[6:19]
get it.
[6:20]
We asked for an extension, but they
[6:21]
weren't really considering it.
[6:22]
No, they weren't open to that
[6:25]
. So let's finish it. The
[6:28]
recreation director and I are
[6:30]
finalizing a
[6:31]
recreation grant that expires, I believe, tomorrow.
[6:34]
We have some letters of support for
[6:36]
that. Basically, it's for
[6:39]
finished product work. These are things from the
[6:42]
later stages. So we've
[6:45]
thoroughly analyzed the park behind the
[6:48]
elementary school and the small details that
[6:50]
cost money and need to be done to
[6:53]
finish the project and make everything look great
[6:56]
there. We have several things that we
[6:59]
are trying to complete with that.
[7:03]
In addition, we are investigating a new
[7:05]
grant for improved roads that
[7:07]
was released this week. The deadline
[7:08]
for that is
[7:10]
September 2028. So Nate and I
[7:13]
are looking into what we can do
[7:15]
. There are three different sources of
[7:17]
funding and options. So we're
[7:20]
looking at what we might
[7:22]
need in the city that would fit within
[7:24]
those funds and help our budget a little
[7:27]
. Brilliant.
[7:29]
Anything to add, department heads
[7:31]
?
[7:32]
Clear.
[7:32]
Yes, absolutely. Regarding our
[7:35]
waste disposal, UVM was
[7:37]
here last week and started their
[7:40]
final project; The full synopsis
[7:42]
should be ready by December, and
[7:44]
then they will hold a presentation which
[7:46]
I will attend to bring you the information
[7:49]
. The engineer is working with
[7:51]
them. So, regardless of
[7:54]
how they prepare the proposal, the
[7:56]
engineer will approve it. Therefore, it
[7:59]
could receive funding. It will
[8:01]
basically be a ready-to-
[8:03]
start project, which is huge for
[8:04]
us. I mean, they can see how much
[8:07]
the engineering costs are and the fact that it's
[8:08]
done pro bono is great.
[8:11]
That's excellent.
[8:15]
Anything to add, Mike?
[8:16]
Through the
[8:18]
Rutland Regional Planning Commission,
[8:20]
I am involved in a
[8:22]
safety committee training. [
[8:25]
Continuation of the previous segment]
[8:28]
We had an inspection at the plant,
[8:31]
just so you know. We've never
[8:35]
done it before, but we're going to
[8:37]
start closing the door there, so
[8:40]
no one will have access to the property
[8:42]
itself. I have spoken with a company.
[8:47]
We are going to install a path.
[8:52]
ATVs, bicycles, and
[8:55]
motorcycles will not be allowed to pass, but kayakers,
[8:57]
fishermen, and others will still have access
[9:01]
without having to go around the entire fence.
[9:04]
Where is this microphone?
[9:06]
At the water plant itself. There's always been
[9:08]
a big gate up there.
[9:10]
Except it's never been closed or used, you
[9:13]
know. It has always been
[9:15]
public land. Let them walk, hike,
[9:17]
or do whatever they want. But with the way
[9:21]
things are going in security and cybersecurity,
[9:23]
we're going to start closing that door.
[9:27]
That way, if something happens, at least they'll have to
[9:29]
make an effort to get into the building.
[9:33]
Yes, in fact there have been people camping
[9:35]
in their parking lot up there.
[9:45]
Um, maybe you already said that, Terry, so I
[9:47]
apologize. What
[9:50]
explains why the Rutland plant
[9:52]
cannot receive our sludge?
[9:55]
Carrie has more details about that,
[9:58]
sir.
[9:58]
No, they just told me they're at
[10:00]
maximum capacity.
[10:01]
OK.
[10:01]
They have a new chief operator, so
[10:04]
I guess that has something to do with it. They are
[10:06]
also short-staffed and
[10:08]
normally process their sludge on the
[10:09]
second shift, so I don't know if they
[10:11]
are operating a full second shift
[10:13]
. It has been very, it has been uncertain
[10:15]
. Alright
[10:16]
. Um, so we're only
[10:18]
sending one load per week to
[10:20]
Skenctity and that's with the
[10:22]
tanker truck. The problem we're
[10:24]
going to run into is that they can't use the
[10:26]
tanker truck in winter. So
[10:27]
if it gets cold, we're in serious
[10:29]
trouble because then they can only
[10:31]
use the 4,000-gallon tank.
[10:34]
So,
[10:35]
and you,
[10:36]
and right now I'm only sending 6,500 gallons
[10:39]
per week, and we're actually
[10:42]
putting 16,000 gallons per week into that tank
[10:45]
.
[10:46]
You say mud. So, is it just
[10:48]
waste?
[10:49]
That's the waste. That's the
[10:50]
final product we have.
[10:51]
So, instead of transporting it,
[10:54]
can you have Doris come and
[10:56]
pump it for us?
[10:57]
Doris comes and pumps it.
[10:59]
And we have to do something about it. There are
[11:02]
very, very few places that process mud
[11:06]
. So that's not septic material.
[11:07]
And I know that sometimes septic material
[11:09]
and sludge are confused. That's why I
[11:12]
was confused.
[11:14]
There is a very big difference between
[11:16]
septic material and sludge. I have called
[11:17]
all the municipalities in our area.
[11:21]
Um, there's a regional plan for Mbury
[11:22]
within 5 years, but that's
[11:24]
5 years from now. Um, I spoke with Granville.
[11:29]
does not accept mud. They only accept, or
[11:31]
used to accept, septic material. Um,
[11:33]
mud is our final product. It's
[11:36]
very thick. Um, and it needs to be
[11:40]
processed further and dried
[11:42]
before going to the landfill. And that's why
[11:45]
we're analyzing our
[11:46]
sludge study, to see if there's anything we can
[11:48]
add that reduces it to a
[11:50]
solids level that can go
[11:52]
directly to the landfill. The problem
[11:54]
with that is that all the landfills in
[11:55]
Vermont are also closing. Mjm.
[11:57]
Uh, which means that, eventually
[11:59]
, right now everything is going north.
[12:02]
Uh, that one will probably close and everything
[12:04]
will have to go to Ohio. Do you
[12:06]
mean Coventry? Ohio.
[12:09]
Coventry is also on the list.
[12:10]
Mjm.
[12:11]
So, they have a lot of work
[12:14]
ahead of them, huh?
[12:15]
Yes. So, basically, the
[12:17]
real solution is to switch to
[12:19]
Class A biosolids. Uh, and yes,
[12:21]
I did my research, I went to a demonstration
[12:24]
of a Class A dryer in Middlebury,
[12:26]
but they cost about 3 million
[12:29]
dollars. So, it's probably not
[12:31]
in our budget right now
[12:33]
.
[12:34]
What is the...Yes. What is the
[12:35]
revenue opportunity with
[12:37]
a Class A service like that?
[12:38]
Well, class A is currently being
[12:41]
used for, uh, VTrans. They use it as an
[12:44]
amendment when they're working in
[12:46]
grassy areas and things like that. The
[12:49]
problem with that is that if they approve the
[12:52]
PFAS regulations,
[12:54]
everything will probably change again and there will be even
[12:56]
more regulations. So right now we
[12:59]
just need to get to class A,
[13:01]
which is basically heat and solids, you
[13:03]
know, raising it to a certain temperature
[13:05]
to kill all the pathogens.
[13:07]
But if they include PFAS, that's going to be
[13:11]
another obstacle. Okay, the
[13:15]
PFAS are coming. So,
[13:17]
in the last training I
[13:19]
attended from the state, it seems to be
[13:21]
in 2029. And the MCL, which is the
[13:27]
upper limit, will be cut in
[13:30]
half and more chemicals will be added to
[13:33]
the list. So it's going to be a
[13:38]
major concern for the country,
[13:40]
not just for our
[13:42]
wastewater treatment plant.
[13:44]
Mjm. And, in fact, our plant was
[13:46]
part of that PFAS study; I
[13:47]
volunteered and we came out with
[13:49]
very low levels. So, for now,
[13:51]
we're good. Uh, and that's due to the
[13:53]
fact that we don't have much of an industry
[13:55]
.
[13:55]
And the same is true for our
[13:57]
water supply. There is
[13:58]
absolutely nothing there that is on
[14:00]
the list. Regarding
[14:05]
Chad's earlier question about
[14:07]
revenue potential, without getting bogged down in this
[14:09]
discussion, but uh, instead of selling
[14:11]
the final product if we had a
[14:13]
dryer, is there also
[14:15]
revenue potential from receiving sludge from other
[14:17]
municipalities that are...
[14:19]
We will never accept sludge. We could
[14:21]
possibly receive sewage in
[14:22]
the future.
[14:23]
OK.
[14:23]
We will never reach the point where we won't, and
[14:25]
probably never will, have the
[14:26]
capacity to handle other plants.
[14:28]
even if we had that dry. I do
[14:30]
n't believe it. Uh, we're talking about
[14:33]
storage and many other things. Uh
[14:35]
, but I'm possibly considering
[14:37]
maybe doing some septic tank work.
[14:40]
So, that's also something that
[14:42]
Hoyle and Tanner are going to review with me.
[14:45]
So, we realize that
[14:47]
expenses are always going to go up and
[14:48]
we need to find a way to
[14:50]
generate income from that. That's why we
[14:51]
're analyzing it. Alright
[14:54]
. Report from the
[14:59]
municipal manager. Put it all together. He put it
[15:01]
all together. Yes.
[15:02]
Uh, any unfinished business? It seems there are
[15:05]
no outstanding issues.
[15:07]
New topics. Okay, let's continue with our
[15:10]
current topic and have our
[15:12]
discussion on the repair
[15:14]
and rehabilitation plan for the
[15:16]
sewer collection system.
[15:20]
OK. So guys, uh, a
[15:21]
couple of weeks ago I delivered this
[15:23]
preliminary sewer system to you. Uh, actually I
[15:26]
added things to it because
[15:28]
Hoyle and Tanner gave me the
[15:30]
final report after that. So, I added a few
[15:32]
things. And I also gave a couple of
[15:37]
you a copy of
[15:40]
Hoyle and Tanner's actual report. It's not in color. I have
[15:43]
one with color images. Uh,
[15:45]
obviously it was too expensive to try to
[15:47]
print everything in color here. Uh,
[15:49]
we only made one copy. So, if anyone
[15:53]
wants to see our photos, they look much
[15:55]
better on the copy I have. So,
[15:58]
I guess I'll leave it up to you
[16:03]
. Do you have any questions about it?
[16:05]
Like, how do they want us to...?
[16:06]
Can you explain the changes to us?
[16:09]
So, the changes were, uh, let's see.
[16:17]
So on the page where
[16:20]
level three was, I thought maybe a lot of
[16:22]
this we could do internally in
[16:25]
terms of smoke testing and, uh,
[16:28]
connections, locating the
[16:30]
rainwater connections. Hoyle and Tanner
[16:33]
actually gave us a price of
[16:34]
$85,000 to do that. And I'm
[16:36]
thinking that maybe we can come to
[16:38]
a compromise and perhaps some of it will
[16:39]
go to Hoyle and Tanner and some of it
[16:41]
to us. Uh, for phase two of
[16:44]
manhole inspection, Hoyle and
[16:46]
Tanner gave us a price of 75,000
[16:49]
because there are 119 manholes left that have not been
[16:51]
inspected. Basically, when
[16:54]
they did the inspection, we took all
[16:56]
the places we know that normally
[16:58]
have problems, and that's where they
[17:00]
focused first. Uh, those are
[17:08]
basically most of the changes I
[17:09]
think I made, which was to add their
[17:11]
actual costs, estimated costs for
[17:13]
them. Do
[17:24]
you need to take any action from us
[17:25]
tonight? I suppose there's a
[17:28]
discussion about whether they want to proceed
[17:30]
with Foil and Tanner being part of
[17:32]
it, or if they want to try to have us
[17:34]
handle it internally. Um,
[17:35]
what are your thoughts on
[17:36]
this?
[17:38]
What's realistic to do internally?
[17:40]
Um. I mean
[17:41]
, apart from the two of them.
[17:42]
That's really difficult for us
[17:44]
to do a detailed report like the one
[17:46]
they did.
[17:47]
For a start. We really don't have
[17:49]
as much knowledge as they do about the
[17:51]
actual structures and, you know, how
[17:53]
everything should be put together. M.
[17:55]
Um, and I really don't have the resources,
[17:57]
you have to send at least a minimum
[17:58]
of two people and if I send two
[18:00]
people, then I have no way of
[18:02]
planning.
[18:07]
Yes.
[18:08]
Um, so what internal work,
[18:10]
if any, have they done that would
[18:12]
be there? Because we just received
[18:16]
this report. Um, basically the
[18:17]
only thing that's happened now is, uh,
[18:19]
Nate and I had an argument about
[18:21]
the sewers that wouldn't open
[18:22]
. And of those 12 manholes that
[18:25]
could not be opened, only two of them will be
[18:27]
able to be opened in a feasible way.
[18:29]
Some of them have been paved
[18:30]
recently. And two of them aren't
[18:32]
even structures for, um,
[18:34]
for the sewer anyway.
[18:36]
So, we don't really care about
[18:37]
those. So let's start with that.
[18:40]
Um, I wanted to say, some of the things
[18:42]
they recommend doing are part of
[18:44]
deep cleaning. So hopefully
[18:46]
when Mike does his, um, hydro-wash,
[18:49]
we wanted to take advantage of that again and
[18:51]
wash our system so we can move
[18:53]
some things around. And then I'm going to
[18:55]
take three blocks and do a
[18:57]
real vacuuming and cleaning this year.
[19:01]
Instead of covering all the streets with
[19:03]
a little water, I'm going to take three and
[19:05]
have them suctioned out and cleaned.
[19:07]
Correct. I have a question. Clear.
[19:10]
You said that two of them are
[19:12]
covered with recent paving.
[19:15]
Yes. Recently paved.
[19:16]
Who paved them? Was it the
[19:18]
municipality or the state?
[19:19]
It was the state. But the problem was that they had
[19:21]
n't been identified before.
[19:23]
So they've been buried for
[19:24]
so long that people don't even
[19:26]
know where they are. They
[19:26]
were under the pavement then.
[19:28]
They were under the pavement and have now
[19:29]
been repaved.
[19:31]
OK. Because I was wondering who
[19:32]
authorized paving over them.
[19:34]
That's all. These are just things that have been
[19:36]
overlooked
[19:38]
year after year.
[19:39]
Why aren't we locating and
[19:41]
opening them?
[19:42]
Well, we're trying to locate them
[19:43]
. That's part of what this is about.
[19:45]
If you saw the original map we
[19:47]
worked with, it wasn't even accurate.
[19:50]
So if we manage to find those
[19:52]
manholes now, is the state
[19:53]
responsible for coming and lifting them?
[19:56]
I suppose that's true for us, because they
[19:57]
paved it. We don't pay them. I
[19:59]
highly doubt it because I believe it was up
[20:00]
to us to mark them.
[20:02]
This work should have been done long before
[20:04]
the paving began,
[20:05]
right?
[20:07]
Since I've been here, at one time it
[20:09]
was common practice to pave over them
[20:12]
and then excavate when they wanted to access
[20:14]
them. But during the last few years
[20:18]
of Joe's time here, that
[20:19]
changed, it changed to "why are we doing
[20:21]
that?". So we started to correct it
[20:23]
. Probably some of the ones
[20:25]
Carrie mentions were paved
[20:27]
10 or 15 years ago and it was never
[20:29]
identified that they were there.
[20:31]
And there are only two of those that you know of.
[20:34]
Yes that's
[20:34]
fine. No, no, you said two. That's what
[20:36]
I was...
[20:37]
You have to understand that when we did
[20:39]
the GPS mapping of the system, we had a
[20:41]
very old, faded, and not
[20:43]
necessarily up-to-date map. So
[20:46]
we took that map. We did a lot of
[20:48]
fieldwork with the GPS, and that's where
[20:51]
we really needed to start. And
[20:53]
all of this is coming together now. That's why
[20:56]
I, you know, really
[20:58]
pushed to get the GPS done.
[21:00]
To have a starting point.
[21:02]
If you have a GPS and you're nearby,
[21:04]
could a metal detector detect it?
[21:09]
Well, we searched the cemetery trying
[21:10]
to find all the ones that were there
[21:12]
and we couldn't.
[21:13]
With a metal detector? Yes.
[21:15]
I think we're getting lost in the
[21:17]
details. Alright
[21:18]
. No no. I was just
[21:20]
curious. That's all.
[21:22]
So, they have three levels.
[21:25]
Yes. They
[21:26]
are prioritized. Level one
[21:30]
concerns safety.
[21:32]
Level two is quite important, and
[21:34]
level three is a
[21:36]
research program. What...and maybe I
[21:41]
missed...maybe I missed that? What
[21:45]
would it financially entail to address
[21:47]
the entire first level? Are there any, uh
[21:50]
...
[21:51]
they have the short report, if you go to the
[21:53]
second to last page, the sheet describes
[21:56]
that in number six, summary of
[21:58]
costs and
[22:00]
financing considerations. So yes, I see it
[22:07]
broken down into 1,500 per manhole.
[22:10]
Uh, a contractor quote is needed
[22:12]
for level two. I didn't
[22:14]
know if we had more
[22:15]
specific numbers. Um, in the immediate next steps
[22:18]
, he says, uh, $50,000
[22:20]
of capital line for materials.
[22:22]
Is that the total amount, we believe, for
[22:24]
the first level?
[22:25]
We're in...um, I think so.
[22:28]
OK. Going to point seven on the
[22:32]
next page, I imagine,
[22:37]
based on the wording, that 50,000 is what we
[22:39]
're considering for the first
[22:41]
level, but
[22:43]
that's to rehabilitate those
[22:45]
identified as the most serious, the
[22:47]
manholes, and that's basically just
[22:49]
some repair work, um, changing
[22:51]
some of the covers.
[22:53]
OK. And do we have, does the DPW have the
[22:57]
capacity to make this a
[23:02]
focal point for some time, I don't know how long
[23:05]
this would take. I know part of this
[23:07]
says, uh, certain fall
[23:09]
of
[23:10]
2026. Um, where, where am I? Right
[23:19]
here. Um, so 50,000 in material
[23:27]
for the first level and we have,
[23:30]
where did I see this? I'm looking for numbers all over
[23:35]
this, this uh document here.
[23:37]
Uh, we have, uh, a balance in the
[23:40]
sewer reserve fund of what
[23:42]
and I don't think that's necessarily
[23:44]
correct now because we had some
[23:46]
expenses that came out of there and we're
[23:47]
having, um, the work done at the
[23:49]
River Street pumping station.
[23:51]
Yes.
[23:51]
Um, that's going to have to come from there, and
[23:53]
engineering came from there. So I
[23:55]
'm not exactly sure about that
[23:56]
balance, and I think that was before they got
[23:58]
paid as well.
[24:01]
Where would you recommend we start?
[24:04]
So, I think if we take the, um,
[24:06]
manholes listed in this
[24:08]
report that we can actually fix, there are
[24:10]
probably about 15 to start
[24:12]
doing that if DPW and Wastefire
[24:14]
could work together and come up with a
[24:16]
plan to at least address maybe one
[24:18]
per week.
[24:20]
Yes.
[24:20]
Um, the cleaning needs to be done this
[24:22]
fall for everyone identified
[24:24]
in the report as needing a
[24:25]
deep clean. M, um, so I'm going
[24:27]
to address that part and we have 15,000,
[24:30]
I think, in the, um, at the bottom of the
[24:32]
sewer that I had, uh,
[24:34]
put there for cleaning, but we're going to
[24:37]
use that for a deep clean and
[24:40]
not a general clean. So that
[24:42]
will probably be closer to 10,000
[24:44]
instead of 15,000. So 5,000 of that
[24:46]
could probably go towards
[24:47]
some of the repairs.
[24:49]
OK. To do all that
[24:52]
immediately, how much money would
[24:53]
I need? I need to meet with
[24:56]
Nate and see what kind of covers we have,
[24:57]
because we might have covers and
[24:59]
things like that, so I don't feel
[25:01]
comfortable giving him a number. Alright
[25:02]
. So, uh, when... So,
[25:05]
basically, I'm just
[25:07]
looking for guidance on, you know,
[25:09]
the possibility of taking another 50,000
[25:11]
maybe and seeing what I can do with Oil
[25:14]
and Tanner for further research.
[25:17]
Well, Adam Street's report has
[25:19]
n't arrived yet. That project, as it
[25:23]
now looks, is that we're going to end up
[25:26]
with pump replacements and
[25:29]
pipe replacements. The
[25:32]
intake pipes that are in the wet well
[25:34]
. We probably won't have to redo
[25:36]
the pumping pipe. We did the
[25:38]
reduction test and it seems the
[25:39]
pump pipe is not the
[25:41]
problem. It's a 6-inch pipe,
[25:43]
which should be sufficient. It seems
[25:46]
the bombs are working
[25:47]
against each other, and that's the
[25:49]
main problem. We are considering a
[25:52]
completely different design, with the
[25:54]
pumps having a main pump and
[25:56]
a backup pump. Thus, one is
[25:58]
stronger than the other. And they won't
[26:00]
surpass each other so easily. And
[26:03]
hopefully that will solve some of
[26:05]
the problems at our
[26:07]
Adam Street pumping station. But part of
[26:10]
that project would also be to build this
[26:12]
sewer right here, at the corner
[26:15]
of West and Washington. We know that that
[26:18]
sewer is completely
[26:19]
deteriorated and is not draining properly
[26:21]
. The way it discharges, it
[26:23]
basically hits against the wall and
[26:25]
is deteriorating it even more. It
[26:27]
should have fallen
[26:28]
straight inwards. I
[26:32]
understand that that
[26:34]
particular sewer is beyond our capabilities.
[26:37]
Correct. Because that will have to be
[26:40]
pumped with a bypass system.
[26:41]
And
[26:42]
that's not really something we have
[26:44]
the ability to do.
[26:46]
The Adam Street pumping station.
[26:48]
How suitable is it for something like
[26:51]
growth?
[26:53]
No, it's not suitable at all. And that
[26:57]
leads to further discussions about
[26:59]
needing to conduct hydraulic studies
[27:01]
at some of our other
[27:04]
pumping stations as well, because if we plan to
[27:06]
develop anything, our other
[27:08]
pumping stations are going to need
[27:10]
increased capacity. Oh, that may be it,
[27:14]
we really should take one
[27:18]
and the engineers have asked for
[27:19]
a deep dive into that
[27:21]
engineering
[27:22]
and the engineers have asked what
[27:24]
our development plans are. There's
[27:25]
no point in spending money twice
[27:27]
here.
[27:28]
Correct. Exactly.
[27:30]
Yes.
[27:32]
And just to give my opinion on this, it was
[27:34]
in the spring when we did our
[27:35]
hydraulic cleaning. It was the first
[27:38]
time we met and put water into
[27:40]
the sewer system. We opened
[27:44]
a fire hydrant on Academy Street
[27:47]
and it overwhelmed that pumping station
[27:49]
there. So, you know, they were
[27:53]
thinking of putting a new development
[27:55]
there on Academy Street. They have to
[27:57]
rebuild the sewers and
[27:59]
Oh, yes. Yes. It is, I mean, it's
[28:01]
part of the conversation. Well, yes,
[28:03]
but I'm just saying that as we
[28:05]
start putting water in these...
[28:08]
Well, that's true. It's about setting
[28:10]
appropriate expectations so that everyone
[28:12]
understands where we are,
[28:13]
probably exposing many problems
[28:15]
that we don't even know about.
[28:17]
Yes. Yes. No, good point. Good point.
[28:24]
Just one question about your level 2, your
[28:26]
first line, um, has a flow of
[28:29]
5700 gallons per day. Is that a
[28:32]
water leak or what?
[28:34]
So, the flow can come from
[28:36]
anything, from
[28:38]
sump pumps to holes in our
[28:40]
sewers. Um, and we have several
[28:42]
manholes that actually still
[28:44]
have the old hook holes
[28:46]
where they would go and hook them up, you know,
[28:48]
pull them out that way. Those don't
[28:50]
need much of a crack to let
[28:52]
in a lot of water. Um, so
[28:54]
, and we know we have
[28:55]
cracked pipes. We have, we have
[28:57]
clay pipes.
[28:57]
Where, where is that?
[28:59]
Those sewers.
[29:00]
No. Where is that leak? Where
[29:02]
is that in...? It does not appear by name.
[29:05]
It's listed by
[29:06]
No, I'll have to go to the
[29:07]
district court to get the
[29:09]
exact locations, but it's practically
[29:10]
everywhere. We probably have,
[29:12]
I think there are probably 20 of those
[29:14]
manholes that still have the
[29:16]
hook holes. So, that's
[29:18]
coming in directly. We know that
[29:19]
we have, um, rainwater connected
[29:22]
in, um, near Academy Street. There are
[29:25]
three storm drains right there
[29:27]
that we identified when Mike and I
[29:28]
were cleaning. Um, that's part
[29:30]
of the plan for this fall, to continue
[29:32]
with that. But I have an
[29:34]
immersion solution. So, we're actually going
[29:36]
to check, um, while we're, running some
[29:39]
water over there. It will be a good
[29:41]
opportunity to review the storms
[29:42]
and see if they are connected or not. But
[29:46]
we know that, we know that we have them on
[29:48]
the south side.
[29:51]
And also, that clay pipe also
[29:53]
lets water in.
[29:54]
Absolutely.
[29:55]
Water enters each joint at certain
[29:57]
times of the year. Yes.
[30:05]
And I'm not looking for a decision
[30:07]
tonight in any way. I just
[30:09]
wanted them to know what our
[30:11]
idea, our plan, is.
[30:13]
And with some of this we can already begin.
[30:15]
Um, the other thing I wanted to talk about, I was
[30:18]
n't sure if they needed
[30:20]
additional funds from the reserve to
[30:23]
help them with...
[30:25]
I think I'd like to sit down with
[30:27]
Public Works and see what we can
[30:28]
do internally before approaching
[30:30]
them, but I haven't really had the
[30:32]
time; You know, Nate and I have only
[30:33]
talked about the 12 sewers. It's the
[30:36]
only thing we've had time to
[30:37]
sit down and talk about. Um, okay.
[30:40]
But, uh, I think I want to sit down with
[30:41]
him and see what we have in inventory
[30:43]
that we can repair. What does he feel he
[30:46]
can fix? What do I need to get
[30:48]
quotes for regarding the sewers we've
[30:50]
identified as being at higher risk?
[30:52]
Is it something we can do ourselves? Is it
[30:55]
something I need to get quotes from external providers?
[30:58]
So, we also don't
[30:59]
want to deplete our
[31:01]
reserves in everything related to
[31:02]
engineering because things always come up
[31:04]
. I mean, obviously, River Street, we didn't
[31:06]
expect that one to have a
[31:08]
problem. Um, and the other thing I
[31:12]
thought might be helpful, since I
[31:14]
know you guys really can't
[31:16]
solve a lot of problems in one
[31:18]
meeting, is to form a small committee
[31:21]
that can start reviewing all of this.
[31:24]
Um, I know Sam is familiar with
[31:26]
some of the things I've been
[31:27]
trying to work on, but
[31:29]
our sewer allocation form
[31:30]
is completely
[31:32]
outdated. Um, that really
[31:34]
needs updating. So I've already
[31:35]
made drafts of that. Um, we didn't
[31:38]
have a temporary download form
[31:40]
. So, when we have
[31:43]
businesses in the area that need to
[31:45]
download something to our system and
[31:48]
aren't regular users for some reason
[31:50]
, or need to download something extra, I've
[31:52]
designed a temporary download form
[31:54]
so we can get
[31:56]
analytics and have a guide. Because we can't
[31:58]
say "No, it can't," if we don't
[32:00]
even have a
[32:01]
temporary download form. Um, I've been
[32:04]
working on an
[32:06]
industrial pretreatment survey. So, if
[32:09]
people come who we know are going to
[32:11]
have a business, they can take this
[32:12]
survey so we know what they are
[32:14]
contributing to our system. Um, and
[32:16]
we might be able to get something
[32:18]
established. And that applies even to
[32:20]
restaurants, because we've been
[32:22]
terrible with our
[32:24]
fat ordinance and it's taking its toll.
[32:26]
So I've worked on a
[32:28]
fat and FOG reduction program, and we have
[32:31]
a checklist for
[32:33]
our restaurants that they can follow
[32:35]
. Perhaps we can at least start by
[32:38]
inspecting some of our
[32:39]
restaurants, you know, giving them
[32:41]
guidance on what not to
[32:43]
pour. And if we at least show up from time
[32:46]
to time, the grease traps will get
[32:48]
cleaned because they know we'll come to see them
[32:50]
. Uh, our municipal
[32:53]
sewerage ordinance is very
[32:55]
outdated. There are things about it that
[32:56]
no longer apply. For example, we have
[32:59]
there that it is acceptable to have, uh,
[33:00]
food waste disposers, you know,
[33:01]
garbage disposals connected to the system. The state
[33:03]
of Vermont has banned that. There
[33:05]
should be no
[33:06]
garbage disposal connected to any system.
[33:08]
You know, we know that all
[33:09]
food waste must be composted now.
[33:11]
It's how it should be in
[33:13]
regular trash. So, there's a lot of work to be done and
[33:16]
things that need to be reviewed. And I'm
[33:19]
thinking that if we had a small
[33:20]
committee that could meet from time to
[33:22]
time and start reviewing these
[33:23]
drafts and how to implement
[33:25]
some of these things.
[33:28]
OK. Um, let's
[33:32]
work on forming that, Carrie, because I
[33:34]
believe it's something
[33:35]
I'd like to be a part of.
[33:37]
Yes, we can work on forming that
[33:39]
committee and then when I
[33:41]
know, go, look at that.
[33:43]
When there is a draft that the entire
[33:44]
board can review, then
[33:46]
we will address it and that's
[33:47]
fine. Because I mean, I
[33:49]
started them, but obviously I need
[33:50]
input. So that's what the
[33:57]
questions are. No, that was great.
[34:01]
Thank you very much,
[34:02]
very revealing. Excellent work.
[34:04]
Thank you.
[34:07]
for your hard work and bad
[34:09]
nose.
[34:12]
Although he put a smile on her face.
[34:14]
Just so you know, regarding the
[34:16]
disposal problem we have right
[34:17]
now, we are limiting how much
[34:19]
we are wasting. So I'm not going
[34:22]
to arrive. I'm not going to have
[34:24]
perfect numbers. So I'm going to...we're
[34:26]
limiting how much we're
[34:28]
wasting. We've been
[34:30]
transferring like crazy. Uh, actually
[34:32]
I transferred 20,000 gallons from the
[34:34]
sludge storage tanks.
[34:36]
So we have some space, so
[34:38]
we're not in a desperate situation, and that's why
[34:40]
I'm limiting what
[34:41]
I send to Connectivity. So,
[34:44]
we're doing everything we can
[34:46]
internally to limit the
[34:48]
additional cost.
[34:50]
Thank you. I had a question at the
[34:52]
last meeting. Precision Industrial.
[34:55]
Yes.
[34:55]
What...what did they clean?
[34:57]
They came and cleaned all the sand from
[34:58]
the Atom Street pumping station.
[35:00]
Uh, they couldn't carry out the
[35:02]
hydraulic study with the amount of sand
[35:04]
that was there. And in fact, my transducer
[35:06]
that operates the pumps was submerged
[35:08]
in sand.
[35:09]
So they sucked all of that up. And
[35:10]
our aeration basin that we've had
[35:12]
out of service had
[35:16]
more sand than they could take to
[35:18]
Schenectady. So obviously
[35:21]
sand is still a problem even
[35:23]
with our sand removal system
[35:24]
. So they cleaned all the sand
[35:28]
. Um, it was actually at the same level
[35:30]
as the top of the aerators
[35:33]
and uh Terry came over, I had him come and
[35:36]
see how much sand
[35:38]
was actually in there. And
[35:40]
obviously we can't allow it to
[35:41]
reach the level of our aerators
[35:42]
because it would cut off aeration. We made
[35:44]
one tank this year and we'll make the other
[35:46]
tank next year. Alright
[35:48]
. Thank you.
[35:54]
Very good. We have Chuck Brown on the
[36:00]
agenda. I
[36:02]
don't see it here. He joined us
[36:04]
via Zoom. I was
[36:05]
just looking for a letter of support for a
[36:07]
pedestrian crossing in front of the
[36:09]
Capton Community Center, um, from the board,
[36:12]
looking for it from you, the board. Alright
[36:15]
.
[36:16]
Um, basically a letter, just a letter of
[36:18]
support. Um, they are requesting to install
[36:20]
a pedestrian crossing. I think it's the
[36:22]
senior center, the community hub
[36:23]
to cross over to the trails, I
[36:26]
imagine. Yes. So that would be something they would have to
[36:28]
go to the
[36:29]
state for
[36:31]
because our people use it. So that's why
[36:34]
they're okay with it.
[36:36]
They also serve our
[36:38]
citizens. Yes. I did it
[36:40]
. He said he would come. So do
[36:42]
n't
[36:45]
excuse me. I don't know who Chuck is. I did
[36:49]
n't know. I believe that in the past,
[36:52]
when towns or other municipalities
[36:54]
have asked for our support,
[36:57]
their boards have usually requested some kind
[36:59]
of backing.
[37:01]
Yes. I don't know if he's a member of the
[37:04]
Capital Center. Don't know. He called me and
[37:07]
asked to be on the board's agenda
[37:09]
. Don't know. I told him today at
[37:11]
7:00. I do
[37:11]
n't know if it's a reasonable suggestion to
[37:13]
make if you speak to Mr. Roundtree
[37:15]
again. But perhaps we could sign
[37:17]
as part of many in a single
[37:19]
letter, if perhaps that would not be as
[37:21]
significant as writing our
[37:23]
own letter. But it would
[37:25]
certainly alleviate the burden. Yes.
[37:29]
And even if that, or if they authorize one of
[37:31]
us to write a letter on his
[37:32]
behalf supporting him, that's also
[37:34]
fine if he contacts us. Alright
[37:37]
. Why not, why not
[37:40]
, why don't we postpone this issue
[37:42]
to give it a little more time
[37:44]
while we review the rest of our
[37:46]
new business, and if it comes up we can
[37:48]
accept it? We have Mr. Richards on
[37:55]
the agenda for two topics. First,
[37:58]
review of Law 181 of the
[37:59]
planning board. Um, with the great
[38:03]
spirit of delegation and
[38:08]
the first part has been mainly
[38:10]
my fieldwork, uh, right now,
[38:13]
so we got level 1B and to
[38:18]
get to level 1A now we have to
[38:21]
form the center association, the steps I
[38:26]
have to follow right now are to create
[38:29]
a memorandum of understanding with the
[38:32]
people. And then the state wants
[38:36]
us to have a community reinvestment agreement
[38:42]
that all of you would
[38:44]
sign, along with the other
[38:47]
people who are helping with whoever
[38:51]
is on the board of this, just
[38:54]
to say that you support the
[38:58]
center's partnership and that you will help with the
[39:01]
memorandum of understanding.
[39:05]
They also want the town to provide an
[39:09]
annual stipend to the center's association
[39:12]
, preferably around
[39:16]
2,000 to 2,500 each year. And that would go towards
[39:20]
fixing up the center, or what
[39:23]
the state calls beautification,
[39:26]
to help us find someone to
[39:29]
help fund grants or to
[39:32]
write grant applications for us. Um,
[39:40]
I've prepared a sort of draft
[39:44]
or a good draft of a 5-
[39:47]
year plan. And once I have everything ready,
[39:52]
I will present the 5-year plan, the
[39:55]
memorandum, the reinvestment agreement, and
[40:00]
all of that. Now, if my
[40:04]
memory serves me right, I thought we had already gone
[40:05]
down this road.
[40:08]
So, we were on pause,
[40:10]
okay?
[40:11]
When Law 181, with all its
[40:13]
problems, was passed, this was put on hold because
[40:16]
I spoke to you about this
[40:18]
last year. Exactly the same. I
[40:22]
even go back further, to when we
[40:24]
were
[40:25]
editing the municipal plan
[40:27]
and were thinking about the
[40:28]
designation of the center. Um,
[40:30]
right. TRUE. Yes. This has been in the
[40:32]
works forever, and now we're at
[40:34]
this stage.
[40:35]
OK. I am
[40:36]
level 1A.
[40:38]
I thought, not this iteration of the
[40:40]
board. I thought that when you were
[40:42]
on the board, we even had an
[40:44]
understanding—I don't know if anything was put
[40:47]
in writing—but we had an
[40:48]
understanding that there would be
[40:50]
year-on-year investments in a
[40:52]
partnership at the center. Was
[40:55]
any action taken at that time? We did
[40:57]
n't do it, we didn't get to that point.
[40:59]
OK. Uh, they told us,
[41:02]
we directed the
[41:04]
planning commission to begin the process of
[41:07]
, um, of the law, of, um, uh, of the center
[41:10]
to obtain the center's designation
[41:13]
. So, the center is a
[41:17]
very bureaucratic initiative from the beginning, and
[41:20]
fortunately, Ann knows how to
[41:23]
handle it much better than I do, because I get
[41:26]
very frustrated when, you know, you
[41:28]
submit something and then they say "yes,
[41:31]
but..."
[41:32]
oh yes.
[41:34]
So we've been dealing with that,
[41:37]
and when all the fuss happened with
[41:40]
Law 81, the last part of which was
[41:43]
rural development, which doesn't affect us that much
[41:46]
. Um, the first part is what we
[41:50]
're trying to do at the center.
[41:55]
So that stayed pretty much the same, but it
[42:00]
changed enough that
[42:02]
we have to do everything again. We
[42:05]
already have much of that. Although we
[42:09]
looked at each other when you were talking about water
[42:12]
and sewage, and when we had a
[42:15]
designation that there were
[42:17]
adequate and developable water and
[42:20]
sewage services in the center. Um,
[42:24]
we'll need that again, and it looks like we'll
[42:26]
need to hear from the
[42:28]
water and sewer department again that we're still
[42:30]
okay. But we'll get to that as we
[42:35]
go through the steps.
[42:39]
Most of the steps are just
[42:42]
formalities. The next thing that
[42:44]
really needs to happen is the
[42:46]
partnership of the center,
[42:48]
right? I have to manage to train her. I had
[42:52]
several meetings last year, such as
[42:54]
with the Legion. I went to all the
[42:58]
different businesses downtown. Not
[43:00]
all of them, but I spoke with many of the
[43:02]
business owners to see if they
[43:04]
would be willing to join. I spoke
[43:06]
with a couple of members of the community
[43:08]
to see if they would be interested in
[43:10]
it. So it's been a while.
[43:13]
Therefore, I don't know if everyone
[43:15]
is still willing to join. They know it's
[43:17]
on hold, or that it was on
[43:19]
hold until the
[43:22]
Law 181 issue was resolved, because they weren't seeing any
[43:25]
of this.
[43:26]
Yes.
[43:26]
During that time. So there was no point in
[43:30]
moving forward if everything was going to change.
[43:33]
What are your thoughts on revisiting the
[43:35]
EDP concept?
[43:37]
Well, initially they didn't want to do it
[43:40]
, but on second thought.
[43:43]
Maybe we need
[43:45]
Yes.
[43:46]
Just to get enough
[43:48]
people.
[43:49]
Mhm.
[43:50]
For both.
[43:51]
Yes. That's right. So
[43:53]
they can work, they should be able to
[43:55]
work together in my opinion. It's just
[43:57]
that
[43:58]
one will be the other, probably
[44:00]
due to the number of volunteers
[44:02]
needed.
[44:04]
Yes.
[44:04]
Correct.
[44:05]
Well, and that was when I was talking to
[44:07]
Devon the other day, he seemed to think
[44:09]
that things had changed a bit,
[44:12]
that we could bring them together and make it
[44:14]
work.
[44:15]
That makes sense, doesn't
[44:17]
it? Yes, it really does.
[44:19]
Yes. I don't know if our funds for the
[44:22]
center's partnership should
[44:24]
remain separate from the
[44:26]
EDC funds. Don't know.
[44:29]
Which means, they should know that we are
[44:32]
going to request funds in the
[44:35]
planning commission's budget to
[44:37]
have that. to have something to
[44:41]
start this year with. Hey. Alright
[44:43]
.
[44:44]
Uh, so you'll see it, no, don't give yourselves
[44:46]
a heart attack. It's not, it
[44:48]
's not the end of the world.
[44:49]
No, it's to help fund the
[44:51]
start of this.
[44:52]
Yes. And it will be for everything. Beautification
[44:56]
, uh, maybe even, uh,
[44:59]
infrastructure donations for a
[45:02]
grant, whatever.
[45:05]
Well, but it's, it's what the state wants
[45:08]
. They want to see that there is a
[45:11]
commitment from the people.
[45:14]
towards the center and towards the corporation
[45:18]
or towards development, the association
[45:21]
that is there. So that's what they
[45:24]
're looking for. What they want
[45:26]
is for us to work on improving
[45:29]
Fair Haven's infrastructure by being
[45:33]
an ally to the people, to, uh,
[45:37]
provide energy and input to
[45:40]
address bicycle and
[45:42]
pedestrian access, signage,
[45:44]
parking, lighting,
[45:47]
landscaping, accessibility,
[45:49]
connectivity, and other things that may
[45:52]
come up. Yes, I don't know, I was going to send, I was going to
[45:58]
send Terry. I was going to send them
[46:01]
Ann's five-year plan. It is, it is a
[46:03]
very good document. I'll send them to you.
[46:06]
I mean, you can all read it. Did I
[46:08]
send it? I do
[46:09]
n't believe it. Alright
[46:10]
. I had a lot going on today.
[46:13]
No problem.
[46:14]
But it's a very positive document
[46:17]
and it's very professionally done,
[46:19]
the state will love it. But it looks
[46:23]
great. Thank you. He's
[46:31]
their player. Let me just send it to you.
[46:34]
Thank you. Thank you. But we're
[46:37]
starting, we're essentially
[46:39]
starting over with a lot of the
[46:41]
work already done. Or at least all the
[46:44]
preliminary work is done and now we just
[46:47]
have to put it on the portal in a
[46:49]
format that Devon promised to
[46:51]
help us with. Devon has promised to help us
[46:54]
. He
[46:54]
himself.
[46:55]
He, uh, he has staff,
[46:58]
so he's freed up some of his
[47:00]
own time and he, he has a
[47:02]
special affection for Fair Haven and
[47:03]
grew up here. Excellent. Thank you.
[47:09]
all for your work
[47:10]
on that. I know it's a
[47:12]
lot.
[47:15]
The second point was the
[47:16]
zoning changes for Prospect Street to
[47:18]
allow mixed use.
[47:19]
This was much easier. I promise.
[47:22]
Essentially, what we need is
[47:24]
a, um, is a, um, public hearing
[47:27]
of you. The
[47:29]
planning commission held its
[47:31]
public hearing recently, but it went missing
[47:34]
during the transition when
[47:36]
Joe left and all that. This should have already
[47:39]
happened. We're changing the
[47:42]
designation of the first part of
[47:44]
Prospect Street, where the
[47:47]
slate mill and all that was, which was
[47:49]
industrial.
[47:51]
So we want to change it to mixed use
[47:53]
. That makes ownership of everyone
[47:56]
there more viable. You
[47:59]
know, the only thing they could
[48:02]
sell their houses for right now would be
[48:04]
to put a factory in there, and that's
[48:06]
simply not going to happen there. So
[48:09]
this is mixed use. It could be
[48:11]
commercial, it could be residential, it
[48:13]
just changes it. So what
[48:16]
we need from you is to
[48:18]
set, um, you have to make an
[48:21]
agenda and say that you're going to have a
[48:23]
public hearing. I think it's 15
[48:26]
days, so they probably won't be able to do it
[48:27]
at the next meeting. I
[48:29]
'm not sure, but I
[48:30]
should probably check, but I think
[48:32]
ours is 15. Hour. You're
[48:36]
not going to believe me. Nobody is going to argue with that
[48:39]
. You know, if I had 15 minutes before
[48:41]
my regular meeting, I'd probably
[48:42]
have enough time. Let's see,
[48:44]
then it would be within two meetings
[48:46]
.
[48:46]
Yes, that works for some people. And
[48:48]
were there four plots of land?
[48:49]
Four. Essentially, there are four
[48:51]
plots. Yes, that change. But it
[48:53]
simply makes that area
[48:55]
much more viable. You know, I'm pretty
[48:58]
sure we're not going to get another
[49:01]
GE stuck in there, you know. So, which
[49:06]
is probably a good thing,
[49:07]
actually.
[49:08]
But, um, that's what this is all about. And I think I
[49:13]
sent them, I know I sent them
[49:15]
a copy of what he has to say and
[49:18]
all that kind of stuff.
[49:21]
Um, and it should be a piece of cake. I can't
[49:25]
imagine anyone arguing about that. It
[49:27]
makes that property much more
[49:29]
viable. They did
[49:30]
n't argue at our meeting.
[49:31]
No, we didn't have anyone. So
[49:34]
I suspect they'll be safe.
[49:35]
They were silent.
[49:38]
Next question.
[49:40]
However, we have to do it 15 days in advance
[49:41]
. I think so
[49:41]
.
[49:43]
They have to publish. Yes. It
[49:45]
's a public hearing.
[49:47]
So that probably,
[49:48]
we're probably...
[49:49]
15 days wouldn't work then. Uh-huh
[49:51]
. We
[49:51]
probably won't achieve it at the
[49:52]
next meeting. But you know, if you
[49:54]
publish it between now and then,
[49:56]
we'd have a meeting after
[49:58]
that. Probably.
[50:00]
They would celebrate it on a
[50:01]
regular meeting night.
[50:02]
Yes. 15 minutes earlier.
[50:05]
Yes, that's it. It's, it's, it's something quite
[50:07]
simple. Mhm.
[50:10]
And then we will have the next step,
[50:14]
once it is reviewed and you
[50:18]
agree with that change, the next
[50:21]
step will be to deliver a
[50:25]
zoning regulation that everyone has in their
[50:29]
hands, which has been a
[50:33]
three-year process. Okay, but we'll have something that
[50:38]
includes all the changes of the
[50:41]
last few years. The historic district,
[50:45]
the subdivision rules, all of that
[50:47]
will be there, plus a
[50:49]
clean copy of everything we've changed
[50:51]
over the past 3 years. So it
[50:54]
will be good to have it. That's all. That
[50:58]
seems fine to me. Thank you. Ask. Here
[51:04]
's the best part of this. As
[51:10]
they say in French, au revoir.
[51:14]
Very good. The next point is the
[51:17]
MERP grant.
[51:20]
As I said before, we need to
[51:23]
try to move forward with this quickly.
[51:26]
Bill and I worked hard to
[51:29]
get more than one quote for
[51:33]
building an ADA ramp. We
[51:36]
are going to change, you already
[51:38]
approved it, the change of the door.
[51:41]
We are going to install an ADA door. It will
[51:43]
open to the other side. Then
[51:45]
we will have the porch with a ramp so
[51:47]
that people in wheelchairs
[51:49]
can access the
[51:51]
police station. There are approximately six
[51:55]
of what remains of MERP, out of the 83 or 86
[51:58]
thousand dollars. $63,000 of that
[52:02]
could be used for this entire project
[52:05]
. That's approximately $20,000
[52:07]
for the Royal Glass door we already
[52:08]
mentioned. This price reached
[52:11]
$18,650. So we'll be well
[52:16]
within our funds to be
[52:19]
able to complete this. So I would
[52:21]
ask you to discuss it, approve it, or
[52:25]
ask questions. I
[52:26]
have a question; I'm not opposed to
[52:29]
aluminum in any way, but I was
[52:31]
wondering if Cavino was asked
[52:34]
about using something like Trex in the
[52:36]
construction of the platform and
[52:39]
ramp. I do
[52:42]
n't know, I think the platform itself
[52:44]
was going to be pressure-treated wood,
[52:47]
but I think only that landing is going to be
[52:49]
... Ah, the 5x5 aluminum landing. I mean
[52:59]
, we can
[53:00]
quickly ask about Trex to see what
[53:02]
the cost difference is.
[53:03]
As discussed. So, that's
[53:06]
pressure treatment, you said?
[53:09]
The porch itself is pressure treated.
[53:12]
Yes.
[53:12]
Okay. I understand, to build a
[53:15]
pressure-treated landing. OK.
[53:19]
There's a plane they based it on, and
[53:22]
we were thinking of moving it to
[53:24]
center it more and make it visually
[53:26]
more appealing than having it off-center.
[53:29]
So the whole porch would be moved
[53:31]
to be centered with the main one and
[53:33]
then the ramp would come out, but it wouldn't
[53:35]
look like it does now.
[53:36]
And what would happen first, the
[53:38]
construction of the landing or the
[53:39]
replacement of the door? Well, the
[53:42]
door materials have already been
[53:44]
ordered, so I don't know.
[53:45]
And you are going to sign to pay the
[53:48]
first 50%. In fact, they were here
[53:52]
yesterday. Royal Glass was looking,
[53:54]
checking the direction of the door
[53:56]
and what we were going to do with the porch.
[54:00]
But we think the door
[54:01]
should probably go first, since they're going to be
[54:03]
changing a lot of parts there,
[54:06]
rather than having to move something from the
[54:08]
porch once
[54:10]
construction starts.
[54:12]
And that has already been discussed with Coino
[54:13]
as well, that the new door is on its
[54:15]
way. Alright. And as I said, once
[54:17]
we have a signed contract,
[54:20]
we have until December 31st. And
[54:23]
in fact, it seems the state
[54:25]
is even willing to extend
[54:27]
the deadline a little on that part. They seemed flexible
[54:30]
regarding the end of the year, just not
[54:33]
this September 30th for
[54:34]
contracts suddenly. Okay then
[54:37]
. OK. Oh, and just to
[54:42]
recap, we tried to get other
[54:44]
quotes.
[54:46]
Yes. So, you can see that this is
[54:48]
from August. This is dated
[54:50]
August 25th. We've had this for a while
[54:52]
. We've
[54:54]
called, texted, and
[54:56]
asked everyone we know. Does
[54:59]
this Cabino LLC have any
[55:03]
connection to the police officer
[55:05]
who works for us?
[55:06]
He is the brother of the Jehovah's Witness who also
[55:08]
works here. Brother, that's why
[55:09]
I asked for clarity, so we would have it, so
[55:12]
this is okay for
[55:15]
no conflict, it's fine, I just
[55:17]
want to make sure I don't cross any
[55:19]
lines.
[55:20]
I think at one point Mr. Go
[55:21]
was also looking for people. I
[55:26]
just want to make sure I don't cross
[55:27]
any lines. We've been
[55:28]
trying to do this
[55:29]
since, when did you, Mr.
[55:31]
agreeing, start trying to achieve that a
[55:32]
few years ago? We
[55:34]
simply haven't been able to find
[55:36]
a contractor since we got the
[55:37]
money.
[55:38]
Yes, you mentioned it.
[55:42]
No, good question. Excellent question.
[55:45]
Absolutely.
[55:46]
Given the difficulty in finding
[55:48]
someone to quote this job. I hate to
[55:50]
be picky about the budget
[55:52]
itself, but I hate when a budget
[55:53]
is not broken down. Um, is there a
[55:56]
version of this provided by
[55:58]
Camino that was broken down? No. And to
[56:01]
be honest, having worked in the
[56:03]
construction industry, that's not
[56:05]
something you see very often.
[56:09]
Yes.
[56:10]
Because much of their work is based
[56:12]
on their estimates of the project
[56:14]
timeline, and because labor is
[56:16]
a significant part of it. So
[56:19]
they estimate a certain part and
[56:25]
most construction companies
[56:27]
won't break that down, because then
[56:29]
you'd say, "You said it would take 5 days
[56:32]
of 8 hours and I saw that they were only there for 3 and a
[56:34]
half," or something like that. So
[56:37]
no, I,
[56:38]
the breakdown, unfortunately,
[56:41]
is not something common.
[56:42]
The only thing I think we
[56:44]
should talk to them about, Terry,
[56:45]
that I haven't discussed yet, is the
[56:47]
actual cost there; I think it could be a
[56:49]
little lower, it's the removal one,
[56:50]
because our DPW can remove
[56:52]
any debris.
[56:54]
Put it on a dump truck and
[56:55]
take it away, so they wouldn't have to
[56:56]
do that. So I was hoping, you
[56:59]
know, that it might be a little less,
[57:00]
but we haven't had that conversation.
[57:02]
And as I said, we were expecting to
[57:04]
get other things and nothing. We
[57:05]
had nothing to compare it to. This
[57:10]
price is one month old. Yeah
[57:12]
. So I will accept a motion to
[57:17]
accept this offer. I will introduce a
[57:22]
motion to accept the offer for up
[57:26]
to the project amount of $
[57:30]
18,650. That sounds good?
[57:35]
No, I would say don't exceed it.
[57:36]
That does not exceed $18,650.
[57:42]
Is it $650 or $50? I heard 15. I
[57:47]
believe him. I
[57:48]
wrote it wrong. No, no problem.
[57:51]
And that's for the replacement of the ramp and
[57:54]
rest area, to be carried out by Cavino
[57:56]
LLC.
[57:57]
Yes, what you said.
[58:01]
I support the motion. Any further
[58:04]
discussion?
[58:06]
Everyone who is in favor.
[58:13]
Thank you.
[58:17]
Of course. Very good. 2 minutes. One
[58:22]
comment. I
[58:24]
have no comment. I have a
[58:26]
question.
[58:27]
Why is the
[58:28]
dog park gate closed? I went to the
[58:32]
dog park for the first time the other day and
[58:35]
thought it was closed because the
[58:38]
door was locked.
[58:43]
Isn't the gate somehow connected
[58:44]
to the village garage or something
[58:46]
? And I'm going to look for an aerial map of the
[58:49]
area while we talk. So, please excuse me
[58:51]
.
[58:51]
I had to contact Linda.
[58:54]
I had the impression that
[58:57]
we discussed this a while ago and someone came and
[58:59]
said something about closing the door for
[59:02]
some reason. But that was the door
[59:04]
that leads outwards.
[59:06]
That's the entrance to the runway. Alright
[59:07]
. I knew there was another
[59:10]
door leading in, but you have to go
[59:12]
through that door to get into the
[59:15]
dog park. You proved it was the
[59:17]
wrong house. I'm sorry. You can walk through it.
[59:21]
Yes, that's what I did. But I didn't
[59:22]
know because I had never been there; the
[59:24]
dog park gate
[59:26]
was also closed.
[59:27]
No, I was able to enter the dog park.
[59:31]
The other door is closed.
[59:33]
But with the other gate, I thought, "
[59:35]
Wow, am I supposed to go through
[59:37]
here? Am I supposed to go around it?
[59:39]
Should I or shouldn't I? Is there a camera
[59:41]
somewhere, and the boss is going to come
[59:43]
flying in, and my poor Delelfie and I are going to go
[59:45]
to jail?"
[59:47]
I think the gate in the road is just there
[59:49]
because people come up, back their
[59:51]
trucks out, and trash the field. So
[59:54]
,
[59:54]
if you park in that
[59:57]
parking area, you just walk in, and
[59:59]
you can get into the dog park.
[1:00:00]
Yeah. That's what I did. And the
[1:00:02]
Linda family told me that. I contacted Linda
[1:00:04]
because I was thinking, "Is the
[1:00:05]
park open? Is
[1:00:06]
it closed? Is it?" "Because I'd never
[1:00:08]
been to the people. If you talk to
[1:00:13]
people, just share that. Yeah, it
[1:00:14]
's definitely open. But yeah
[1:00:17]
, especially when it gets wet,
[1:00:19]
people like to go out of their way and into the
[1:00:21]
middle of the airport.
[1:00:23]
Yeah, I couldn't understand that. I was
[1:00:25]
like, what? Why?
[1:00:26]
Sorry, you there. I
[1:00:28]
was totally confused.
[1:00:35]
Yeah. Well, I have two points. The
[1:00:40]
first, um, just so everyone is aware
[1:00:43]
, um, and I already posted this.
[1:00:47]
So, the fundraiser
[1:00:49]
for the people at the
[1:00:51]
Wherever State Apartments has
[1:00:53]
officially closed, and thanks to all the
[1:00:55]
generous people, we raised a total of
[1:00:58]
$743. A very
[1:01:02]
special thanks to the businesses that supported
[1:01:03]
this effort: The Wooden Soldier, Fair
[1:01:06]
Haven Pizza House, Cloud9 Dispensary,
[1:01:09]
Luminous Beauty Salon, and Abashons
[1:01:11]
Hardware. I also want to thank Jasmine
[1:01:14]
Derky of Slate Valley Cares, who
[1:01:16]
helped immensely with
[1:01:17]
coordinating this effort, and that
[1:01:19]
very special lady from the Red Cross
[1:01:21]
who asked to remain anonymous.
[1:01:25]
Um, I'll ask for..." New to anyone who
[1:01:28]
knows people who lived there and have
[1:01:30]
n't yet
[1:01:33]
contacted Slate Valley Cares, please
[1:01:36]
contact them. Um, the
[1:01:39]
phone number is 265-3666. Um, so they
[1:01:45]
can, you know, and they'll provide
[1:01:47]
assistance to those people. Um, so
[1:01:50]
if you know anyone, please
[1:01:52]
tell them to contact them. Um, that's
[1:01:55]
number one. The other thing is, I've had
[1:01:59]
people talking to me
[1:02:01]
about the memorial plaques.
[1:02:07]
When the trees were planted
[1:02:10]
downtown, um, one of the ways they
[1:02:14]
raised money for that,
[1:02:16]
they had people buy
[1:02:19]
memorial plaques in memory of so-and-so or so-and-so
[1:02:21]
or whatever to put
[1:02:23]
around the trees.
[1:02:25]
Well, now that the trees are
[1:02:26]
practically gone,
[1:02:28]
um, people are just walking
[1:02:31]
right on the plaques. They're
[1:02:33]
breaking, and the people who
[1:02:36]
bought those plaques are getting
[1:02:38]
upset. Um, I talked to Joe about
[1:02:43]
this a while ago, but I
[1:02:46]
never really got a response. Um, a
[1:02:53]
People would really like to see if
[1:02:56]
those plaques can be lifted and
[1:02:58]
put somewhere else where they won't be
[1:03:01]
destroyed. Um, I asked Joe if there was
[1:03:06]
a way to put them
[1:03:08]
around the fountain in the park,
[1:03:11]
like that piece, the big piece that goes
[1:03:15]
around it. Not where the mulch is,
[1:03:17]
because people walk right
[1:03:19]
on that,
[1:03:21]
but either to the sides or maybe on
[1:03:25]
top of it. Um, just
[1:03:29]
somewhere where they won't be
[1:03:31]
destroyed. I realize it's late
[1:03:36]
in the year, so it's not something that
[1:03:39]
can be done right away, but maybe
[1:03:42]
you guys can, you know, put your
[1:03:45]
minds together and think of a solution for
[1:03:48]
the spring.
[1:03:51]
And these were sold
[1:03:55]
to raise money for the trees?
[1:03:57]
Yes.
[1:03:58]
Okay. There are quite a few.
[1:04:00]
The understanding was that the trees were going to be
[1:04:02]
there
[1:04:04]
forever.
[1:04:06]
Yes.
[1:04:07]
Um, sort of. Um, and you know, I've had
[1:04:11]
people—and you can see if you walk around
[1:04:15]
there—several of them have cracked
[1:04:20]
Mmm.
[1:04:20]
Um, chipping at the sides. Uh,
[1:04:24]
when the trees were There,
[1:04:26]
people weren't walking on them because
[1:04:29]
they were walking around the tree.
[1:04:32]
Yes.
[1:04:33]
So, but now that the trees are gone
[1:04:35]
, people aren't paying attention
[1:04:37]
and are just walking right on them
[1:04:39]
I think the starting point is
[1:04:42]
probably to ask Nate if there's a
[1:04:45]
chance of digging them up and
[1:04:48]
preserving them in the process. And then from
[1:04:52]
there, it's decision-making. I do
[1:04:55]
n't know much about the physics of this.
[1:04:56]
I figured between Mr. Greeno and,
[1:05:00]
uh, Dennis, you guys might be able to work
[1:05:03]
something out.
[1:05:04]
Yes. So maybe we'll talk to Nate
[1:05:06]
to see what's possible.
[1:05:07]
Yes. What I said is
[1:05:09]
probably the same as Ros, like,
[1:05:12]
probably in the spring, review it, I mean,
[1:05:14]
have the conversation
[1:05:16]
now, see what we can do, but
[1:05:19]
possibly wait until spring
[1:05:21]
because we'd like to do something with the
[1:05:23]
sidewalk there, and we want it to be
[1:05:25]
warm enough for it to set properly and
[1:05:28]
settle, because they have
[1:05:30]
quite a bit of work right now. We do
[1:05:32]
n't want huge holes in our
[1:05:33]
sidewalks right before winter. It's
[1:05:35]
probably not good for the
[1:05:37]
sidewalk cleaning machine or for
[1:05:38]
people's safety.
[1:05:40]
Believe me, I know Okay, I understand those
[1:05:43]
little trenches.
[1:05:45]
Sure. Sure. So, yeah, thanks
[1:05:48]
for mentioning that.
[1:05:50]
One possibility would be maybe to think
[1:05:53]
about planters.
[1:05:55]
That's what I was thinking.
[1:05:56]
The place where the trees are,
[1:05:58]
the planters we have.
[1:05:59]
Great idea. Maybe. That's
[1:06:01]
a great idea.
[1:06:02]
Trees. Trees are a bad
[1:06:03]
idea because there are power lines running all the way around
[1:06:05]
that spot. You don't plant
[1:06:08]
trees under power lines
[1:06:10]
expecting them to last a long time.
[1:06:12]
Mhm.
[1:06:13]
I mean, come on.
[1:06:14]
Yeah.
[1:06:14]
Mhm.
[1:06:15]
So, it
[1:06:15]
wasn't my idea. I'm
[1:06:18]
just saying.
[1:06:19]
Yeah.
[1:06:19]
That could be an idea. I do
[1:06:22]
n't know. We could take some of the
[1:06:25]
flowers from Fair Haven,
[1:06:28]
big planters, and put them in the
[1:06:30]
middle where the trees were, if
[1:06:32]
someone could level it.
[1:06:34]
Yeah.
[1:06:39]
They would have to be more
[1:06:40]
permanent structures, they would have to be maybe
[1:06:42]
...
[1:06:44]
A concrete planter would be pretty
[1:06:45]
permanent. Like the ones she was talking about,
[1:06:48]
those black ones they had outside.
[1:06:51]
They would be easier for
[1:06:53]
sidewalk maintenance in the winter
[1:06:55]
if they were movable.
[1:06:57]
Mhm.
[1:06:57]
Yeah. But then you'd be
[1:06:59]
shoveling over them and Destroying them. That's
[1:07:00]
true.
[1:07:04]
And see, yes. Where we are now. That's
[1:07:06]
fine by me. I
[1:07:07]
just wanted to bring it to your attention so
[1:07:09]
maybe something can be done in the
[1:07:10]
spring.
[1:07:11]
Thank you. Thank you. Uh, parking.
[1:07:16]
I have a comment. I
[1:07:19]
was paying very close attention to
[1:07:21]
Carrie and Mike when they were talking.
[1:07:25]
People complain about the price of water and
[1:07:28]
sewer, and I'm not
[1:07:30]
affected by either. Keep that in mind. I do
[1:07:33]
n't think anyone understands the kind of
[1:07:36]
work these people do. M.
[1:07:39]
I think they go to the plant in the morning
[1:07:41]
and sit and...
[1:07:43]
see how it works and hope it doesn't break
[1:07:45]
down.
[1:07:46]
Yes, there's a huge amount. Did
[1:07:48]
you notice what that girl is doing
[1:07:52]
I mean, she's not a child, but...
[1:07:56]
to me she is.
[1:08:00]
But I'm glad, I'm glad you
[1:08:03]
said that her great knowledge is good
[1:08:05]
What these people are doing.
[1:08:07]
Yes. They're out on the street finding
[1:08:10]
potholes and things to fix, and all they
[1:08:13]
get are complaints
[1:08:15]
while the debris piles up.
[1:08:18]
Yes.
[1:08:19]
Literally and metaphorically. And
[1:08:21]
but they... they find it And they take
[1:08:24]
care of it.
[1:08:26]
It's just amazing. I mean,
[1:08:29]
yeah. And if you go to their plants, well, the
[1:08:31]
water is a little different from
[1:08:33]
sewage, but I don't know if everyone has
[1:08:34]
been to the treatment plant,
[1:08:36]
which she's more than happy for
[1:08:38]
anyone to come and
[1:08:39]
tour. Uh, it's not what you'd
[1:08:42]
think of as a
[1:08:43]
sewage plant. It's clean. It smells
[1:08:46]
clean in most areas. I
[1:08:49]
mean,
[1:08:51]
outside, but they both take excellent care of their
[1:08:55]
plants.
[1:08:57]
Exactly. It's swept and clean.
[1:08:59]
Everything is tidy and clean and where it should be.
[1:09:01]
Yes. Yes. They do an excellent job.
[1:09:04]
It's an excellent job. And I just wanted to
[1:09:06]
say
[1:09:06]
thank you for saying that.
[1:09:08]
Yes.
[1:09:08]
It's just a
[1:09:10]
shitty situation in every sense. I
[1:09:13]
mean, did you ever go there and realize what
[1:09:15]
was going on?
[1:09:18]
Honestly, I don't know. We're going to
[1:09:19]
get rid of this. I don't even
[1:09:22]
know where the
[1:09:23]
water treatment plant is here. Me
[1:09:24]
neither. I've
[1:09:25]
lived here my whole life. The
[1:09:29]
wastewater treatment plant
[1:09:30]
is right next to the transfer station, it's
[1:09:32]
off the road.
[1:09:35]
Yes.
[1:09:37]
Just for the record.
[1:09:40]
Actually, the elementary school—was it the
[1:09:43]
elementary school?—they've
[1:09:44]
really been doing
[1:09:47]
field trips
[1:09:48]
to the sewage treatment plant. They've been
[1:09:49]
doing that at least since
[1:09:51]
I was born because I went to that same one. I
[1:09:54]
just remember my daughter.
[1:09:56]
Guess where we went today.
[1:09:58]
Yes.
[1:10:01]
Peter, Peter did it all those years.
[1:10:03]
Sixth graders.
[1:10:05]
Yes.
[1:10:06]
Good.
[1:10:07]
Yes.
[1:10:08]
Very good.
[1:10:10]
Uh, unfinished business. Thank you
[1:10:12]
. Thank you.
[1:10:15]
Uh, unfinished business. I wanted to
[1:10:18]
briefly mention the
[1:10:20]
revised parks and recreation ordinance that
[1:10:22]
we discussed several meetings ago. It's
[1:10:25]
been almost a month now since
[1:10:28]
I submitted that draft to VLCT for
[1:10:30]
review. I still haven't received
[1:10:33]
a response from them. I should mention
[1:10:35]
that I use their courier service—uh,
[1:10:38]
their advisory service—at least
[1:10:41]
twice a month, and I've never waited this long
[1:10:43]
for a response. I've also
[1:10:46]
never submitted an ordinance for
[1:10:48]
review before. So I guess
[1:10:51]
this legal advice takes a little
[1:10:53]
longer than the typical response I would
[1:10:55]
expect from them. Well, I don't
[1:10:58]
take it personally, but I've
[1:11:00]
followed up again, asking if
[1:11:02]
someone could take a look at it sooner rather
[1:11:04]
than later, so we can
[1:11:06]
proceed with the public hearing and
[1:11:08]
discussion process that would go into
[1:11:11]
adopting that new ordinance or that
[1:11:12]
revised ordinance. Vermont League of Cities and
[1:11:16]
Towns. Um, and that's all I
[1:11:21]
wanted to say about it.
[1:11:23]
Okay. Carrie, any updates
[1:11:26]
on the transfer station, the
[1:11:28]
computer, the internet, the
[1:11:30]
card reader,
[1:11:30]
camper? Uh, blah, blah, blah. We did
[1:11:32]
n't do it, no, wrong word.
[1:11:37]
Sorry, it's past my bedtime.
[1:11:38]
Um, the computer is on order. Uh,
[1:11:41]
they've been working on it. I did
[1:11:44]
some updates on your
[1:11:45]
computer because it stopped working
[1:11:47]
again and stopped printing. So,
[1:11:49]
I managed to get it working again. I haven't heard
[1:11:51]
back about the
[1:11:54]
card reader. So, I'll
[1:11:56]
follow up and, honestly, I'll be
[1:11:58]
completely transparent. That got
[1:12:00]
overlooked. So, I apologize
[1:12:03]
for that. So, I'll look into it. And, um,
[1:12:06]
we're good with Comcast for
[1:12:08]
internet. I'm just waiting for
[1:12:11]
a reason to need it. So,
[1:12:13]
um, I don't want to start paying until we
[1:12:15]
need it. And Comcast is much
[1:12:18]
faster than Consolidated in terms
[1:12:20]
of getting the service up and running. If you recall,
[1:12:24]
Consolidated had to go to the garage
[1:12:26]
because Comcast doesn't, and it took them
[1:12:28]
almost six months to set up service,
[1:12:30]
but Comcast can be there in two
[1:12:32]
weeks. I
[1:12:33]
already have the plant.
[1:12:35]
Yes. Um, I might suggest, if I could
[1:12:39]
give a brief status report—
[1:12:41]
limited in detail, of course,
[1:12:43]
within reason—on our
[1:12:45]
search for a replacement for the
[1:12:47]
town manager, for
[1:12:49]
anyone who might be watching. Um,
[1:12:52]
I'd just like to let
[1:12:54]
anyone who's curious know that we
[1:12:57]
've narrowed it down to a few finalists, about
[1:13:00]
whom I won't reveal much
[1:13:02]
information yet, as we want to
[1:13:05]
make sure they're willing to
[1:13:08]
proceed to a final round of
[1:13:10]
interviews that will take place sometime in
[1:13:12]
the next week or so. Um,
[1:13:17]
which will include interviews with
[1:13:19]
town staff members, employees who
[1:13:21]
will be involved in this
[1:13:23]
evaluation process. Um, but no
[1:13:27]
final decision has been made, although we are
[1:13:28]
entering the phase Finally. Thank you. He
[1:13:36]
said, "Does anyone have any... I should
[1:13:38]
have asked Mike when he was
[1:13:40]
here, but the water plant, excuse me
[1:13:42]
, the water plant rehabilitation
[1:13:44]
, the engineering, have you had
[1:13:46]
any ideas?" "I have
[1:13:48]
n't heard anything from them about that
[1:13:51]
. I get regular communication,
[1:13:53]
obviously, about the Car project,
[1:13:55]
but I'll be contacting the
[1:13:57]
same firm, Hill and Tanner. Are
[1:13:59]
we going to do a roundtable?
[1:14:00]
Hm. Are we going to
[1:14:01]
have a
[1:14:02]
board roundtable? Because we were on
[1:14:03]
backlog. Yes. The
[1:14:05]
water treatment plant rehabilitation is on
[1:14:06]
backlog. Yes.
[1:14:06]
Very good.
[1:14:10]
That's, that's my only question.
[1:14:12]
Okay. Anything else for
[1:14:16]
backlog? Roundtable? Um, we did
[1:14:30]
the card reader. The reason I
[1:14:33]
joined the board, the reason
[1:14:34]
I ran: the
[1:14:36]
winter maintenance plan. Have we
[1:14:39]
started any, uh, plans?
[1:14:42]
Winter maintenance plans for how we're going
[1:14:43]
to approach this winter
[1:14:45]
maintaining the roads to
[1:14:46]
keep them passable. So Nate
[1:14:49]
and I will probably sit down in
[1:14:51]
mid-October to work on that,
[1:14:53]
or with the new city manager
[1:14:55]
when he arrives. They're already starting
[1:14:59]
vehicle maintenance and
[1:15:01]
replacing the sidewalk snowplow,
[1:15:03]
which will be pretty much completely dismantled
[1:15:05]
. They're going to put it back on the board." Paint it and
[1:15:09]
do a lot of maintenance.
[1:15:11]
We're talking about making sure it's
[1:15:14]
ready in November in case an
[1:15:16]
early storm hits. The biggest problem we're
[1:15:20]
going to have... Well, we have two
[1:15:23]
things affecting us this winter.
[1:15:26]
One, obviously, is that until
[1:15:28]
we hire a second driver with a
[1:15:30]
CDL, we'll only have one big truck
[1:15:32]
running. So that's a
[1:15:34]
definite priority. The other is when
[1:15:37]
the new union contract was passed.
[1:15:42]
Uh, it was passed and negotiated before, this. Let me give you the
[1:15:48]
history of when we needed to
[1:15:50]
call in staff. We had a
[1:15:53]
two-hour call-in, which was great.
[1:15:55]
We could call in the whole crew.
[1:15:57]
We know the storm is going to be severe. We'd
[1:15:59]
hit the highways hard for
[1:16:02]
probably an hour and a half, and everyone would
[1:16:04]
come out and have like a half-hour
[1:16:07]
buffer, right? They'd get paid two
[1:16:09]
hours for the call-in. Um, the new
[1:16:12]
contract that was negotiated increased that to
[1:16:15]
four hours. So that makes
[1:16:18]
staffing much, much
[1:16:21]
harder, because I can't
[1:16:23]
afford to have all my staff come in,
[1:16:25]
work hard on the highways for
[1:16:27]
an hour and a half, and I charge four hours
[1:16:29]
of overtime. So
[1:16:32]
last year we really had to work out
[1:16:34]
how we were going to staff
[1:16:36]
during these storms. And I think
[1:16:38]
by the end of the season we had
[1:16:40]
a pretty good system in place. Um, but it was
[1:16:42]
definitely a learning curve
[1:16:44]
because this had never had to be
[1:16:45]
done before. Well, but I will say that, of the
[1:16:50]
new contract, that's one part that I
[1:16:53]
absolutely don't like and I think
[1:16:56]
causes a lot of problems, because I can't
[1:17:00]
justify it to the public or to
[1:17:03]
myself. I live here paying
[1:17:07]
someone for an hour and a half of work
[1:17:09]
, or getting an hour and a half of
[1:17:11]
work from someone who was actually
[1:17:13]
paid for four hours, and that blows
[1:17:14]
our winter budget very
[1:17:16]
quickly with the overtime rates
[1:17:18]
. So that's, again, the Tetris
[1:17:23]
that we'll have to play this winter and
[1:17:27]
solve. Obviously, it's fine if the
[1:17:30]
snow falls between 6:00 and 2:30,
[1:17:33]
but we all know that's not always what
[1:17:36]
happens. So, just so you
[1:17:39]
're aware, that's a big struggle.
[1:17:42]
Because if you think about it,
[1:17:46]
before we could Call in four
[1:17:48]
people, an hour and a half each,
[1:17:50]
right? Six hours of work. That's
[1:17:52]
fine. They all get eight hours of pay.
[1:17:54]
Now, if I call in those four, they're
[1:17:56]
getting 16 hours of pay. That's a
[1:18:00]
big difference.
[1:18:01]
Call in two and have them work.
[1:18:02]
Exactly. Exactly. But it takes a little more
[1:18:05]
time, right? So, that's it. We have to
[1:18:08]
, I mean, we really
[1:18:10]
have to watch our salt usage
[1:18:12]
to keep
[1:18:13]
the trucks running. Sometimes paying
[1:18:15]
guys overtime and keeping them
[1:18:16]
on the road longer reduces
[1:18:18]
salt usage at the end of the storm. I know
[1:18:20]
these last two storms, we were
[1:18:21]
spreading salt for a week
[1:18:23]
afterward, still trying to get the
[1:18:24]
road clear.
[1:18:25]
Trying to get it cleared, and sometimes that's
[1:18:26]
just going to happen, right?
[1:18:27]
We'll have those times when it's
[1:18:29]
just terrible. But if
[1:18:31]
we can, yeah, if we can get it right and
[1:18:33]
have a good amount of salt,
[1:18:36]
right? We were able to buy it in advance
[1:18:38]
this year and got a good price;
[1:18:40]
we still have a good chunk of the
[1:18:42]
money left. The only thing we don't have right now
[1:18:45]
, I think We're
[1:18:47]
completely out of liquid. So
[1:18:50]
we're going to have to buy some. And we also
[1:18:53]
need sand, but we have a plan
[1:18:56]
for that. Nate and I were talking
[1:18:58]
about it last week. Last year
[1:19:00]
we ran out of salt, and everyone
[1:19:02]
ran out of salt because of the storms
[1:19:05]
in the South. So now with our
[1:19:08]
salt shed, we shouldn't
[1:19:10]
have that problem as long as we can
[1:19:12]
keep it stocked. We should
[1:19:15]
be in better shape. So, you
[1:19:20]
're telling me we can have the
[1:19:22]
guys come for an hour and a half, clear the
[1:19:24]
storm, and leave? That doesn't usually
[1:19:28]
happen. There are many times when they work
[1:19:30]
four, five, six, seven hours.
[1:19:32]
There are some times, I'm telling you, but not
[1:19:34]
most.
[1:19:35]
of the time when they come, for an hour and a half, clear, they
[1:19:39]
...
[1:19:40]
So, here's the thing.
[1:19:42]
Maybe, maybe this year we could
[1:19:44]
get them to push the snow back further
[1:19:46]
instead of driving halfway down
[1:19:48]
Academy Street all winter
[1:19:50]
. Maybe they could spend another
[1:19:52]
hour and push the snow back.
[1:19:54]
We'll have a discussion,
[1:19:55]
and that would put a little bit of money back
[1:19:57]
in our pockets.
[1:19:58]
Yeah.
[1:19:59]
You know, it'll
[1:20:00]
follow us costing the same,
[1:20:02]
right? And our budget is still
[1:20:04]
very small. It's still going to
[1:20:05]
cost the same amount of
[1:20:07]
money. Let's not do it, let's work it. No,
[1:20:09]
because I would send two men
[1:20:10]
instead of four.
[1:20:11]
Well, we can still get work out
[1:20:13]
of them, you know, instead of...
[1:20:15]
Oh, yeah. Well, and that's the part
[1:20:18]
Nate and I have talked about, that if I'm going to
[1:20:19]
pay someone for four hours, I need it to
[1:20:21]
be close to four hours of work.
[1:20:24]
I think there has to be some
[1:20:25]
planning to do here.
[1:20:26]
Oh, absolutely. Absolutely. But it
[1:20:28]
also has to work within the
[1:20:30]
budget we've been given.
[1:20:31]
Exactly.
[1:20:32]
So,
[1:20:33]
I think she's talking about the
[1:20:34]
smaller storms. They go out, you call them
[1:20:35]
to ask, can you check the
[1:20:37]
road? So a man goes out,
[1:20:38]
checks the roads, puts down some salt,
[1:20:40]
and does the whole town in an hour and a half.
[1:20:41]
Now you're paying them for four.
[1:20:42]
Yeah.
[1:20:43]
That kind of thing. Or a
[1:20:44]
light storm, they go in, they finish quickly. And yeah,
[1:20:46]
we understand the bigger storms.
[1:20:48]
It is what it is. We have to be...
[1:20:50]
I understand that. But,
[1:20:52]
uh, exactly.
[1:20:53]
I fought all last winter to
[1:20:54]
get them to push the snow
[1:20:55]
back off the roads. Uh, on Academy
[1:20:59]
Street going down to 22A, I could
[1:21:02]
see the S and the T of the stop sign
[1:21:05]
all winter. The rest was all
[1:21:08]
under the snowbank. So,
[1:21:11]
you can't tell me that can't be
[1:21:12]
fixed.
[1:21:13]
The next day, there was a
[1:21:17]
whole lane missing—
[1:21:18]
not just the whole lane.
[1:21:20]
The first street right here. Same thing.
[1:21:23]
If we're still here, then we'll take care
[1:21:25]
of it. Exactly. Exactly.
[1:21:28]
Yeah.
[1:21:29]
Oh, he's not going to go away that fast.
[1:21:33]
Dennis, do you have anything else for
[1:21:34]
round two?
[1:21:35]
No, I'll let that go. That's
[1:21:36]
enough. Okay,
[1:21:39]
I have a couple of things. Uh, first
[1:21:41]
is, does the town own any land?
[1:21:45]
Like, just acres of land?
[1:21:48]
Lots
[1:21:49]
with lots of trees.
[1:21:52]
In some places. Yeah. Did you ever
[1:21:54]
think about cutting it down and putting that
[1:21:56]
money back into the town? It's
[1:21:58]
done. It's been done before. It was
[1:22:00]
done about 10 years ago, I think.
[1:22:03]
Yeah.
[1:22:04]
Um, we were talking about getting a
[1:22:07]
forester to check it out and
[1:22:09]
give us an estimate. Joe was supposed to be
[1:22:11]
working on it, but the forester
[1:22:14]
never got in touch.
[1:22:17]
Yeah.
[1:22:17]
Or something happened
[1:22:18]
that... Yeah, that's what... it just fell through
[1:22:20]
. So, but yeah, we do it
[1:22:21]
. We do that. I
[1:22:24]
was just curious that it's
[1:22:26]
actually from Big Hill Road to Benson
[1:22:28]
Yeah.
[1:22:29]
Oh, wow.
[1:22:30]
Because our road ends there,
[1:22:33]
we go all the way to Benson. So, all of
[1:22:36]
West Haven, that side is actually
[1:22:38]
ours.
[1:22:38]
Oh, okay. This is the other side.
[1:22:45]
Uh, the second thing is, um, I want to read a
[1:22:47]
letter here, dated today, 9/29/26.
[1:22:55]
Dear Select Board Members,
[1:22:57]
please accept this letter as my
[1:22:59]
formal resignation from the
[1:23:01]
Fair Haven Select Board, effective 9/29/26. This
[1:23:06]
decision is made for
[1:23:08]
personal reasons, um, which require my
[1:23:11]
attention. I am grateful for the
[1:23:13]
opportunity to have served the people
[1:23:15]
of Fair Haven and to have worked
[1:23:16]
alongside my fellow board members and
[1:23:18]
town officials. It has been It has been an
[1:23:20]
honor to serve the residents of Fair
[1:23:22]
Haven. I appreciate the trust you
[1:23:24]
placed in me and the opportunity to
[1:23:27]
continue contributing to the community. I
[1:23:30]
wish the board select, the
[1:23:32]
village staff, and the residents of Fair
[1:23:34]
Haven continued success in the future.
[1:23:37]
Thank you for the opportunity to serve and
[1:23:40]
help the village. Sincerely, Keith
[1:23:43]
Hire. So, with that said, this is my
[1:23:46]
last meeting, and thank you
[1:23:49]
all so much for everything. I appreciate it.
[1:23:52]
Thank you, thank you, Keith.
[1:23:53]
Thank you. Thank you for serving on the board
[1:23:55]
Absolutely.
[1:23:59]
Um, in these situations, I can't recall
[1:24:01]
what we did in Mr. Doran's case,
[1:24:03]
but is a motion required to
[1:24:04]
accept the letter? It would
[1:24:08]
n't hurt.
[1:24:11]
I then move to
[1:24:12]
accept Keith Hire's letter of resignation
[1:24:14]
from the board with heavy
[1:24:15]
heart
[1:24:17]
and much appreciation.
[1:24:19]
No second.
[1:24:23]
Thank you for serving on the board. Um, as
[1:24:26]
we've seen over the years,
[1:24:28]
people come in and out of the board a
[1:24:31]
number of times. So perhaps we'll
[1:24:33]
see you again in these seats
[1:24:36]
in the future.
[1:24:37]
There will be a Vacant.
[1:24:39]
Uh, everyone in favor of the
[1:24:44]
motion.
[1:24:45]
is approved. Thank you. Thank you.
[1:24:54]
Excuse me, ladies. Clothes. You can always
[1:25:00]
come sit with us now.
[1:25:02]
That's right. Here's
[1:25:05]
everything I have. Rich, I don't have anything
[1:25:12]
for tonight. Okay. That's fine
[1:25:18]
. Um, well, there's a storm that's been
[1:25:20]
hitting the East Coast. It looks like we
[1:25:23]
won't get the worst of it.
[1:25:25]
But if we had gotten the worst of it, you
[1:25:27]
could have been notified about
[1:25:29]
that storm on VT Alert, which is a
[1:25:30]
big emergency. That was good.
[1:25:37]
You could do yourselves a favor and sign up
[1:25:39]
for those notifications.
[1:25:41]
The State House or something. No,
[1:25:45]
we have to get you. We have to
[1:25:47]
get you now.
[1:25:49]
I can help you with that if you need it,
[1:25:50]
and I'm happy to help anybody else
[1:25:52]
if they need it. Um, and I think I'm
[1:25:55]
going to leave it there for tonight.
[1:25:58]
I'll leave things as they are for
[1:26:00]
tonight as well. Review
[1:26:03]
financial reports. Okay. Tonight,
[1:26:07]
I file a motion to accept the
[1:26:10]
payroll payment order for $
[1:26:12]
42,126.10. Go ahead. Second. I
[1:26:19]
second. Everyone in favor?
[1:26:21]
The motion is approved. I
[1:26:24]
also move to
[1:26:26]
accept the check order for $
[1:26:28]
749,174.71. And that, just so you all know
[1:26:37]
, if you didn't check, has
[1:26:39]
over $500,000 in school fees. So I
[1:26:41]
know everyone shuddered a little
[1:26:43]
because I did too, but yes. Do
[1:26:46]
I hear you for a second? Everyone shocked
[1:26:47]
by that. Everyone in favor, the motion is
[1:26:50]
approved.
[1:26:53]
And I'm not sure if I received what I
[1:26:55]
normally receive that tells me how
[1:26:58]
the checkbook is
[1:27:00]
currently in your box. You have it right up there
[1:27:05]
Oh, okay. Yes, yes, yes. I see.
[1:27:07]
Uh, our checkbook is
[1:27:10]
currently at $115,376.71. That's good
[1:27:21]
. Uh, food truck frenzy
[1:27:24]
tomorrow night.
[1:27:26]
No. Uh, no. Next week.
[1:27:28]
Next Wednesday.
[1:27:29]
Oh, still a week away. Yes.
[1:27:35]
I will accept a motion to go into
[1:27:38]
Executive session under 1 VSA 313A3 for
[1:27:41]
legal and personnel reasons.
[1:27:44]
I will file a motion to enter into
[1:27:46]
executive session under 1 VSA 313A3.
[1:27:50]
I support that. Everyone in favor? Fine
[1:27:53]