Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:00]
Hills EMS.
[0:14]
Sorry. Um, do I need to plug my computer
[0:16]
in or were you guys all good?
[0:27]
» I can do either one. I'm
[0:31]
Plug your computer in. That would be
[0:32]
faster.
[0:38]
» We just need you on the mic.
[0:45]
We need you on the mic like Yeah.
[0:48]
Me now on the mic. Okay. Very good.
[0:52]
Uh so yes, we're coming today to talk to
[0:55]
you a little bit about our uh financial
[0:57]
standing. Um as you can see above here
[1:00]
right now, uh this is our income and
[1:02]
expense report
[1:05]
for uh 2025
[1:08]
for our total expenses were 1.49
[1:11]
million.
[1:11]
» You get started. Can you just extend
[1:12]
your display? That would be the easiest
[1:14]
way to
[2:45]
Perfect. You guys can all see it now.
[2:47]
» Yes.
[2:48]
» So, uh, as we talk about our 2025, uh,
[2:51]
total expenses, we're at 1.49 million
[2:54]
with our total collections of 1.38. As
[2:57]
you guys can see, that is less than what
[2:59]
our expenses are. Um,
[3:04]
over the years, our capital needs have
[3:06]
changed drastically. And I'm not talking
[3:08]
like for the last 10 years. I'm talking
[3:09]
since 2021. As you can see, in 2021,
[3:13]
ambulance costs were about $26,000 for a
[3:16]
unit. This uh in 2026, that's over 330.
[3:20]
I can attest to that cuz we bought one a
[3:21]
month ago that was $332,000.
[3:24]
And that's just the truck. Add on top of
[3:26]
that, like they say, the stretcher
[3:28]
system there is an additional $80,750.
[3:35]
honors we bought in 2018 that were
[3:37]
$15,000. I bought two new ones at the
[3:40]
beginning of this year. That was
[3:41]
$80,000.
[3:46]
As you can see over the years, yes, our
[3:48]
combined capital costs have gone up over
[3:50]
61%.
[3:55]
Over the years, you can see um from 2023
[3:58]
to 2026, every year our expenses go up
[4:01]
about 20%. So, we're also looking that
[4:04]
next year again another 20% on top of
[4:07]
what you know we've been collecting
[4:12]
and that's with our income coming in
[4:14]
just from um our patient transports.
[4:18]
Now, how do we make up that that
[4:20]
disparagy? We do it through our
[4:22]
subscription drive. We do it through our
[4:23]
standbys. We do it through CPR training
[4:28]
as well as uh grants and things like
[4:30]
that. Unfortunately though, that is not
[4:32]
a feasible business practice to continue
[4:35]
on to into the future.
[4:41]
Over the years, we have gotten a uh
[4:44]
small per capita from all the burrows as
[4:46]
you can see here
[4:49]
uh with Bradock Hills paying $1.45 per
[4:52]
person, Churchill paying $4.97
[4:55]
or $4.97 per person. Shelfont who is
[4:59]
elected to do the millillage tax, Forest
[5:02]
Hills doing $187 and Wilkins Township
[5:05]
doing $2.85.
[5:10]
What we're proposing going forward is
[5:12]
putting everybody on an e even keel.
[5:15]
So
[5:19]
sort of like a stepped up proposal as we
[5:22]
start into next year at a $4 per person
[5:24]
per capita. the year after go to six and
[5:27]
the following year to go
[5:30]
help drastically drastically close that
[5:33]
funding gap that we needed
[5:36]
relevant going into the future.
[5:39]
Fortunately, we're not the only
[5:40]
ambulance company that's facing this.
[5:42]
This is all across Pennsylvania. It's
[5:44]
all across the United States. U we also
[5:47]
need to get to a point where we have
[5:48]
about 6 months of uh operational cost in
[5:52]
the bank. Why? because in the last time
[5:54]
they had a medic major Medicare shutdown
[5:56]
43 ambulance services in Alageney.
[6:02]
You don't want to be one of those 43. I
[6:04]
don't want to be one of those 43. So if
[6:06]
I can have six months operational, I can
[6:08]
continue to put fuel in my trucks. I
[6:10]
continue to pay my people and I can
[6:12]
continue to keep the lights on.
[6:16]
We talk about, you know, the uh increase
[6:18]
and stuff like that. Again, this is
[6:20]
nothing new. I know everybody's been
[6:21]
around and heard it plenty times before.
[6:24]
I do have with me um paper from the
[6:27]
Woodland Hills Progress dated August
[6:29]
25th, 2004
[6:32]
where we were asking for $2 per
[6:34]
resident. That was 22 years ago,
[6:39]
asking for $2 per resident and only two
[6:42]
of the services has gotten to that point
[6:45]
or two of the communities got to that
[6:46]
point.
[6:49]
look at even with inflation and things
[6:51]
like that, that $2 would be almost $4
[6:53]
nowadays.
[6:55]
We're at the point where yes, we do need
[6:57]
as much help and funding support from
[6:59]
our local communities, not just Forest
[7:01]
Hills, but from Wilkins Township and
[7:04]
from Bradic Hills.
[7:08]
Questions of me regarding any of it?
[7:15]
» Anyone?
[7:15]
» What? Yeah. What is your largest service
[7:18]
area compared to population? Is it
[7:21]
obviously Wilkins or
[7:23]
» Actually Forest Hills has a higher
[7:24]
population than Wilkins by about a
[7:27]
little over 75?
[7:28]
» Oh yeah. Uhhuh.
[7:30]
So are your service areas pretty much in
[7:33]
line with the populations in terms of
[7:35]
calls and everything?
[7:36]
» Yes, we are one of the busier services
[7:38]
in the area.
[7:40]
» I guess I'm not asking my question very
[7:42]
well. Which bureau has the most calls?
[7:46]
Generally that's Wilkins.
[7:48]
» Okay.
[7:49]
» But that's also because they have the
[7:51]
business district as well as the the
[7:52]
larger portion of the highway.
[7:56]
» Do businesses contribute in Wilkins?
[8:00]
» Some of them do. Not many. I'll be
[8:02]
honest with you. Um our subscription
[8:03]
rate return is at around 20%.
[8:07]
» Thank you.
[8:09]
» Any other questions from anybody?
[8:14]
Um,
[8:16]
if if you could get us copies of the
[8:19]
PowerPoint,
[8:23]
» I'd be more than happy to.
[8:24]
» And the the aggregate amount that we you
[8:27]
you're looking at there
[8:28]
[cough and clears throat]
[8:30]
from if you combine those,
[8:33]
if you go three years out, that would
[8:34]
give you an another about 30%
[8:38]
above your present cushion, right? You'd
[8:40]
increase it by about 30%. 30%.
[8:43]
» Take it up to almost a whopping 10
[8:45]
months of cushion.
[8:46]
» Yes, [laughter]
[8:48]
thank you.
[8:49]
» And that does not also, you know, taken
[8:51]
to the fact that 20% next year of you
[8:54]
increased cost 20%.
[9:00]
» Right. I'll be around afterwards.
[9:02]
Anybody has any questions? Thank you
[9:04]
very much.
[9:05]
» Thank you.
[9:05]
» Thank you. Our
[9:08]
next speaker is uh Miss Pierce from the
[9:11]
CC Miller Library.
[9:18]
» Good evening. Thank you guys very much
[9:20]
for inviting me this evening. Um for
[9:22]
those of you who I have not met before,
[9:23]
my name is Aaron Pierce. I'm the
[9:24]
executive director of CC Miller Library.
[9:26]
Um and as you know, we provide library
[9:29]
services to five different
[9:30]
municipalities in the eastern suburbs,
[9:32]
one of which being Forest Hills. Um we
[9:34]
do this out of two locations. our main
[9:36]
library in Edgewood and obviously our
[9:38]
adorable little postage stamp size
[9:41]
library in Forest Hills. Um I am showing
[9:45]
up here this evening to talk to you a
[9:48]
little bit about our budget request. I
[9:50]
assume that that has been distributed.
[9:52]
If it is not, I can certainly forward
[9:54]
it. Um but we are asking for a cost of
[9:57]
living increase this year. Um we were
[10:00]
grateful for the slight increase that we
[10:02]
received last year. Um and we are really
[10:05]
just trying to keep up with the costs of
[10:07]
doing business. We have learned in the
[10:10]
last couple of weeks that um our state
[10:12]
funding for next year is going to be
[10:14]
flatfunded. Our state funding comes in
[10:17]
at just about 25% of our funding. So
[10:21]
that being flat funded does cut into our
[10:23]
operational dollars to some degree. Um
[10:27]
we have about 25% of our funding comes
[10:29]
from states. about 25% of our funding
[10:31]
comes from local municipalities and the
[10:33]
other 50% of our funding comes from
[10:37]
actually that's not yeah the other 45%
[10:39]
of our funding really comes from like
[10:42]
money that we are generating ourselves
[10:44]
that's you know that's individual
[10:46]
donations that we're getting that's um
[10:48]
fundraising events that we're doing
[10:50]
that's grants that we're writing you
[10:51]
know that is that is money that we are
[10:53]
that we are going out and seeking
[10:57]
so just a few Quick facts about the
[11:01]
Forest Hills folks and how they interact
[11:03]
with our library. Um, Forest Hills
[11:05]
residents love the library.
[11:09]
We have just over 3,000 people from
[11:11]
Forest Hills that are library card
[11:13]
holders. So, that's um a pretty
[11:16]
significant portion of your population.
[11:18]
We have about 60,000 books a year that
[11:21]
get checked out of um our Small Forest
[11:23]
Hills location here. And I'm going to
[11:25]
say we have a full lineup of programs
[11:28]
that happen here. Um, and we cannot keep
[11:30]
people away. We don't run something that
[11:32]
doesn't end up pretty full from the
[11:34]
get-go. So, we are very, very gratified
[11:37]
at the way that the Forest Hills
[11:38]
residents like use the library and we
[11:40]
are very happy to continue providing.
[11:43]
Um, like I said, our request this year
[11:46]
is just a cost of living increase. We're
[11:48]
asking for $34,000.
[11:51]
Um,
[11:53]
what else could I say? Also, this has
[11:56]
been a landmark year for us. We have
[11:57]
embarked this year upon a capital
[11:59]
campaign. Um, we are doing a renovation
[12:02]
to our main location in Edgewood. We
[12:05]
have about a $3 million project. We've
[12:08]
currently raised about 2.85 of that
[12:11]
coming in that home stretch. Um, but we
[12:13]
are starting um construction on that
[12:16]
facility on September 8th. We anticipate
[12:20]
that taking um about a year. Um, but we
[12:23]
will have modified services at our main
[12:26]
location between September 8th and
[12:28]
hopefully the end of March where we'll
[12:29]
be operating just out of our first floor
[12:31]
on that location. We'll still be
[12:33]
offering all of the same things that we
[12:35]
offer. Um, but we will just be doing it
[12:37]
on a much on a much smaller physical
[12:39]
footprint. We're also going to be
[12:41]
offering curbside delivery. So, if you
[12:43]
are looking to pick up your holds at our
[12:44]
Edgewood location, you can still do so.
[12:46]
We're happy to run them out to your car
[12:48]
for you. You can just pull up in the
[12:49]
little park in the little spot in front
[12:51]
of the library and there will be a sign
[12:52]
that you can call.
[12:55]
» Anybody have any questions?
[13:01]
» Yes. Yes, if I may. Um
[13:06]
asking a simple cost of living increase
[13:08]
based on
[13:12]
» Uh it's just over 3% I believe three
[13:15]
3.67 67 is what the cost of living
[13:18]
increase for a cost is is expected to be
[13:21]
for 2027.
[13:27]
» That is the I believe that is the same
[13:28]
model that we used last year in our
[13:30]
request, but I'd have to go back and
[13:31]
double check that. One of the things I'd
[13:33]
be curious about is u
[13:36]
with the the EMTs
[13:40]
I'd like to I think it'd be very
[13:42]
informative for the for all of us to see
[13:45]
where are your expenses and
[13:48]
what's driving the request. I'm not
[13:50]
saying there's not a cost of living
[13:52]
increase, but is that realistic? I I
[13:54]
believe you know you've probably
[13:56]
increased wages due to unionization and
[13:59]
such.
[13:59]
» I can tell I can tell you off the top of
[14:00]
my head that 67% of our budget to 70% of
[14:04]
our budget is staffing.
[14:05]
» It's it's just humans to do the service.
[14:07]
» And what's been the increase in that
[14:09]
over the last year or two? Is it been a
[14:11]
3% or
[14:12]
» It has been pretty much a 3% although
[14:15]
there is a slight variation from person
[14:17]
to person depending upon
[14:19]
» In the aggregate in the contract it's
[14:21]
about 3%.
[14:22]
» Yes. I I wanted to see the relevance of
[14:24]
3% versus what's really costing you,
[14:27]
your your labor, your books, your
[14:29]
electricity.
[14:30]
» Yeah, it's most it's mostly most of our
[14:32]
budget is labor. So, everything comes
[14:33]
down to labor for us.
[14:34]
» All right. Thank you.
[14:35]
» Yeah.
[14:37]
» Anyone else? Mr. Bacon,
[14:39]
» Are you anticipating uh greater usage
[14:42]
here in Forest Hills during the Edgewood
[14:44]
renovation?
[14:45]
» It's a really great question. Um I'm not
[14:47]
entirely sure. I will tell you that we
[14:49]
are increasing the number of books that
[14:50]
we're putting at Forest Hills. Um, based
[14:53]
upon the renovation, the all of our
[14:55]
adult collections at the Edgewood
[14:57]
location are going to be unavailable
[15:00]
with the exception of a I'm going to say
[15:04]
400 book bestseller collection. Um,
[15:07]
everything else that we do at Edgewood
[15:09]
for adults is going to be ordered in
[15:12]
during the time of our renovation. So,
[15:14]
we are going to be taking a lot of our
[15:15]
collections money and diverting it to
[15:17]
Forest Hills. Um, as you all know
[15:20]
though, um, Forest Hills is 900 square f
[15:24]
feet. So, you know, the literally the
[15:26]
number of books that I can add to Forest
[15:28]
Hills is, you know, it's we are already
[15:30]
in a one book in one book out model in
[15:33]
order to add things to our collections
[15:34]
here. So, you will probably see a um you
[15:36]
will probably see a increase in traffic.
[15:39]
The other thing that we anticipate is
[15:41]
that we might end up having a um we
[15:44]
might end up having a few things that
[15:46]
are traditionally held at our Edgewood
[15:48]
location that we will move to our Forest
[15:49]
Hills thinking like board meetings um
[15:53]
you know which great right
[15:57]
» Anyone else
[16:02]
thank you guys
[16:05]
» Our next speaker is Mr. Brett from LSSE
[16:09]
or engineer.
[16:12]
» Uh yes, good evening. Um I did hand out
[16:15]
this evening uh a spreadsheet uh which
[16:18]
is for uh capital expenditures. Uh we'll
[16:22]
cover those in three buckets. Um the
[16:26]
first bucket will be uh sanitary sore
[16:28]
items um which are uh related to your
[16:32]
consent order. Uh this is your second
[16:34]
consent order. um with the Alageney
[16:38]
County uh health department and it has
[16:41]
uh certain requirements and timing this
[16:44]
that's has had to be completed uh over
[16:47]
the last um four years and will continue
[16:51]
over the next three years. Uh at that
[16:53]
time there will be a third consent order
[16:55]
uh that will be negotiated and that'll
[16:57]
be another at least fiveyear consent
[16:59]
order um as Elkasan uh completes its wet
[17:04]
weather plan. uh which the burrow is
[17:06]
part of. The second bucket will be your
[17:08]
storm water improvements. Uh as council
[17:12]
recalls, you have an MS4 permit for your
[17:15]
separate storm source system. And
[17:17]
there's certain elements within that
[17:18]
permit that were to be completed by
[17:21]
2025.
[17:22]
Um the next permit cycle will not be uh
[17:26]
in place until 2027 or 2028. Uh so uh
[17:31]
the burrow has projects yet to complete
[17:33]
um which we have programmed over the
[17:35]
next uh year to year and a half at this
[17:38]
point. Uh the last bucket is your roads
[17:41]
and other public works projects. Uh I
[17:44]
will review these quickly uh with
[17:45]
council so you know uh what the buckets
[17:48]
are currently at.
[17:50]
uh as a um uh point of
[17:56]
um understanding what uh the revenue is
[18:00]
uh for the sanitary and the storm water.
[18:03]
Um round figures it's around uh $4.2
[18:07]
million a year. Um and I'll get to a
[18:10]
line item. It takes half of that which
[18:11]
is your payment to Alcasan for sanitary
[18:14]
sewage treatment. So, uh, starting at
[18:17]
the top, um, engineering related
[18:19]
expenses items in yellow we're still
[18:22]
working through, uh, either with Christa
[18:24]
or the public works committee. Um, uh,
[18:27]
because they're plug numbers from
[18:29]
previous budgets and we need to
[18:31]
understand, uh, the amount that needs to
[18:33]
be in there. Uh, the second item is a
[18:36]
general item, general sore repairs. This
[18:38]
gets tracked year to year. Um, this is
[18:41]
whenever you get that call in the middle
[18:43]
of the night that a sanitary sore is
[18:44]
broken and you have to go in and do a
[18:46]
repair. The bur typically has maintained
[18:49]
a $30,000 line item there. Item three is
[18:54]
your largest expense. Uh, Alka-Sand
[18:56]
sewage treatment. So from uh 2022 to
[19:00]
2026
[19:02]
um Alka-Sand soore charges increase by
[19:05]
7%.
[19:07]
each year for 2027 and beyond. They have
[19:12]
not released a rate increase. I just
[19:14]
checked it as I was sitting here to make
[19:16]
sure it hasn't been uh released in the
[19:18]
last week or so. Um it has on their site
[19:21]
that they're going to release it in late
[19:24]
uh 20
[19:48]
EO uh 913. Um
[19:52]
they're currently bidding a significant
[19:55]
amount of work for their uh consent
[19:57]
order um in the
[20:00]
hundreds of millions if not billions of
[20:02]
dollars, the first round of contracts.
[20:05]
Um, so I think that is why they're
[20:07]
probably waiting to set rates is they're
[20:09]
waiting to see how their first capital
[20:11]
projects come in versus where their
[20:13]
budget was. So I have not had any input
[20:16]
back from them on that. Um, uh, but I
[20:20]
would definitely expect a rate increase
[20:22]
uh, the same as what the last uh, 15
[20:25]
years has had a continual rate increase
[20:27]
every year from Alcasan. So we will
[20:31]
increase that number uh when you see
[20:33]
this next uh when we go through it uh
[20:35]
with Christa and the public works
[20:37]
committee. I think together we should
[20:39]
decide if we want to do 7% or 10%
[20:43]
knowing that maybe their costs have
[20:45]
increased. So um yes Krista
[20:48]
» Just to make note for the audience and
[20:49]
for council this is a statutory
[20:51]
requirement that as a member of Alcasan
[20:53]
that we have to budget the amount that
[20:54]
they're telling us to budget as well as
[20:56]
an expense. So it's not an while we c we
[20:59]
can forecast right now without a set
[21:01]
percentage eventually there's going to
[21:03]
be a letter that says we must reserve x
[21:04]
number of dollars.
[21:06]
» Yes. Yes. It's a prescriptive number. Uh
[21:10]
and uh typically they do it in four-year
[21:12]
tranches which has been very nice from
[21:14]
budgeting. Uh but this year they have
[21:16]
not released it yet. I would expect it
[21:18]
to be a multi-year rate increase again
[21:21]
which will help uh with forecasting for
[21:23]
the future.
[21:24]
Um, next is uh inspection of manholes
[21:28]
and soores are the next two line items.
[21:30]
So part of the consent order is you're
[21:33]
to continually be maintaining your
[21:34]
system. Um, your system's 100 years old.
[21:37]
Uh, plus or minus manholes or brick
[21:40]
manholes. A lot of them need repairs
[21:42]
over time. So instead of trying to
[21:45]
repair everything at once, a little bit
[21:47]
each year is recommended to be set
[21:49]
aside. um the burough had gotten away
[21:52]
from that practice and then you had a
[21:54]
number of emergency repairs uh over the
[21:58]
past decade. Um so we recommend uh you
[22:01]
do set some money aside each year to do
[22:04]
some uh preventive maintenance uh
[22:07]
mapping of the system as you do repairs.
[22:09]
um they're to go into your GIS map and
[22:11]
that gets uploaded with your consent
[22:14]
order each year uh so that uh your
[22:16]
updated mapping is in the regional
[22:19]
system.
[22:20]
Uh next is on and m uh we only put a
[22:24]
small amount uh 500 ft of uh so repairs
[22:29]
to be completed uh just so you have a
[22:31]
number to start with of 25,000. Over
[22:34]
time, uh, as, uh, your system becomes
[22:38]
more evident where repairs are needed,
[22:41]
you will add projects in the future, uh,
[22:43]
with larger numbers to them, but general
[22:45]
O&M repairs, lining, and so so forth
[22:48]
around $25,000 there. Uh, so sewer
[22:52]
overflow response plan, uh, again,
[22:54]
that's for that middle of the night call
[22:56]
that you have an overflow, somebody
[22:58]
calls and says there's a manhole, uh,
[23:00]
discharging. When that happens, uh you
[23:03]
have a uh response plan already adopted.
[23:06]
There's certain things you have to do as
[23:08]
far as cleanup goes and uh you need to
[23:11]
have an align item for the public works
[23:13]
to call somebody out if necessary to
[23:16]
complete work on that. The next item
[23:19]
number nine is flow monitoring.
[23:22]
Um $12,000 is included in that. Uh the
[23:26]
main reason there is because um the
[23:30]
bureau has been successful in getting
[23:31]
grow grants uh through Elkcasan. Uh grow
[23:35]
municipalities complete repairs. Um uh
[23:38]
since you do have funding from Alcasand,
[23:41]
part of that is a closeout report um
[23:44]
from your grow grant to show that you
[23:46]
had a positive impact uh with the
[23:48]
repairs that were completed and flow
[23:51]
monitoring is part of that as well as uh
[23:54]
completing um a final report. Um there
[23:57]
is some QAQC. It goes into that uh flow
[24:00]
monitoring. And then items 11, 12, 13,
[24:05]
14, 15,
[24:07]
uh 16
[24:09]
um
[24:11]
are all all part of reporting to
[24:13]
Elkasan, D, and the health department.
[24:16]
All items that yearly uh have to be
[24:18]
completed. The the cost to complete some
[24:21]
of those reports varies yeartoear. Uh
[24:24]
this is average numbers that we would
[24:26]
see that you will be able to complete
[24:28]
the reports uh based on uh historic data
[24:32]
from the bureau. Uh next is refunds uh
[24:35]
for sewage. Um that item it's in yellow
[24:38]
because um it's been a plug number in
[24:40]
your budget for a number of years. I do
[24:42]
think you've had expenditures that
[24:45]
somebody was overbuilt and uh you've had
[24:48]
to probably do a reimbursement. So,
[24:50]
there's been a small number included in
[24:52]
your budgets to do that from year to
[24:53]
year. Um, potentially somebody had a
[24:57]
water break and had a big bill, they
[24:59]
paid it, and then it had to be uh
[25:01]
reimbured for the sewage. The next one,
[25:03]
again, uh you do have your own street
[25:05]
sweeper. Um there's a number there is a
[25:08]
sweeper gets older. um maintenance on
[25:11]
the street sweeper will increase um over
[25:13]
time. It starts at a very low number and
[25:17]
once a street sweeper gets to 10 years
[25:19]
old um that number is going to be much
[25:21]
higher uh and public work should have
[25:23]
input into what that number should be.
[25:27]
Uh the next item item 19 um is a current
[25:30]
contract uh regionalization repairs um
[25:33]
that the bur has out. It's going to be
[25:35]
completed before the end of the year uh
[25:37]
2027. there's nothing anticipated and
[25:40]
you do have a grant for a part of that
[25:42]
work. Um we do carry the 2026
[25:46]
expenditures in case you have a
[25:48]
carryover that somebody doesn't get
[25:50]
something done that will carry from 2026
[25:53]
into 2027.
[25:55]
Uh same the next item is the repairs
[25:58]
contract um for the regionalization uh
[26:01]
the engineering that's involved with it.
[26:04]
The next one, item 21 is Bradic Road,
[26:07]
Armore uh Silven Road. Um this is one
[26:10]
that when you did your CCTV work um uh
[26:14]
for your region or for your 10%
[26:17]
reduction project, this was an area that
[26:20]
was CCTV and cannot be lined. It's got
[26:23]
an offset joint and um the work is uh
[26:27]
programmed to be completed not in 27,
[26:30]
but we show it in 28 as a future project
[26:33]
cuz 27 you have projects that are higher
[26:36]
on the list to be completed. Um but that
[26:38]
repairs contract over the next couple
[26:41]
years. You want to complete that because
[26:43]
it'll be a maintenance problem for you
[26:45]
and eventually fail. Um so we don't want
[26:47]
to leave it that we could say 10 years
[26:49]
from now we'll get to it. they're
[26:51]
programmed into 2028.
[26:54]
Uh next item is
[26:57]
um
[26:58]
factor truck uh falls into the same
[27:01]
category. Factor trucks and camber
[27:03]
trucks need maintenance to them. Um we
[27:05]
want to monitor that and make sure that
[27:07]
you have a money set aside because
[27:09]
camber trucks break often. This is
[27:12]
something you share I believe with
[27:13]
Wilkins. Um so that needs to be
[27:16]
discussed how that breakout of
[27:17]
maintenance costs are going to be
[27:19]
completed and it's tracked appropriately
[27:21]
for the fund for expenses.
[27:23]
Uh the next project is your 10%
[27:26]
reduction project that was bid and
[27:28]
awarded and you're currently under
[27:30]
construction. So that's a a project that
[27:34]
had um $500,000 in last year's budget.
[27:38]
um project came in at 230,000
[27:41]
and uh when we did the budget at the end
[27:44]
of last year, you had applied for
[27:46]
grants, not received them, and then in
[27:48]
the spring you received them. So that
[27:50]
project became 100% funded by grants. Um
[27:53]
so it still shows up in your 2026
[27:56]
budget. It'll be completed this year. Uh
[27:58]
once it is completed, then that'll close
[28:00]
out uh your 10% reduction project that
[28:04]
was required by the consent order this
[28:06]
year. Uh so a few months ago, Barb had
[28:08]
given an update indicating where we were
[28:11]
at on regionalization and where we were
[28:13]
at on uh 10% reduction. Uh those two
[28:17]
projects were in the low uh teens as far
[28:20]
as percentage complete. By the time we
[28:22]
get to November, they'll be 100%
[28:24]
complete, which is good news. Um
[28:28]
the regionalization project, uh the
[28:30]
questions come up a few times. What's
[28:32]
that for? As part of Elkcasan's consent
[28:36]
order, um they were required to offer
[28:39]
regionalization for any sores that were
[28:42]
multi-municipal, which means your
[28:44]
neighbors go into stores that you own
[28:46]
and maintain. Uh you have a very long
[28:50]
run that goes along Ardmore Boulevard.
[28:52]
Um uh very very difficult to work on. It
[28:57]
is a sore that should be owned by
[28:59]
Alcasan and maintained by them. uh you
[29:02]
and the other communities downstream
[29:04]
each had work to do on the interceptor.
[29:07]
The project you're currently completing
[29:09]
completes that regionalization work and
[29:12]
then it can be um dedicated over to
[29:15]
Elkasan. Uh your neighbors have to
[29:17]
complete their work as well in order for
[29:20]
the whole run to be dedicated. But this
[29:22]
is one of those things that's very
[29:24]
important because the old agreements did
[29:26]
not address how common maintenance was
[29:29]
done in the municipality that it was in
[29:31]
ended up bearing the cost for it. So, uh
[29:35]
I have maps here this evening that shows
[29:37]
this um uh updated uh all the work
[29:40]
that's being completed what the
[29:42]
regionalization store and actually it'll
[29:44]
take the place of those ones on the wall
[29:47]
um because it shows the uh residents
[29:49]
what does they get dedicated in the
[29:51]
future. It also shows all these projects
[29:54]
highlighted in red that either have been
[29:56]
completed or will be completed and
[29:59]
there's a legend on there uh that
[30:00]
council can see. That way over time we
[30:02]
can update it and you'll see the
[30:04]
progress because of the amount of money
[30:06]
that's required to go into this program.
[30:09]
Uh the next item is employee training
[30:12]
and certifications. Uh it's always had
[30:15]
1500 in it. We need to talk to Mike and
[30:17]
see uh if that's the right number, if
[30:20]
it's too low, too high um to make sure
[30:23]
that public works is getting training.
[30:25]
Um there is NASCO training that's
[30:27]
required for the CCTV truck. It's a
[30:31]
national rating system for pipes. They
[30:33]
definitely should have that if they
[30:35]
don't. Uh so that uh the consent order
[30:38]
requires that to be something that's
[30:40]
completed and we can help with that
[30:42]
training if they need it. The next item
[30:45]
is phase three COA. It's not a 2027
[30:48]
expenditure, but I do show it in the
[30:51]
future years because there's going to be
[30:53]
negotiation that happens that both the
[30:55]
solicitor and the engineers involved
[30:57]
with with a manager because the
[30:59]
requirements that go into the phase
[31:01]
three consent order um are going to be
[31:05]
future uh construction uh future things
[31:08]
that you have to address. So, um it's a
[31:11]
multi-year process to get the new
[31:13]
consent order. It's negotiated
[31:15]
regionally mostly by Three Rivers Wet
[31:17]
Weather. Um uh we're the uh program
[31:21]
manager for that. Um but the
[31:23]
municipalities also uh there's a lot of
[31:25]
meetings like this to update what that
[31:27]
next section is. Let me show some plug
[31:30]
numbers in there for what the future
[31:31]
expenditures just to start that
[31:34]
discussion. Uh next, uh you'll remember
[31:38]
we've had one project that we completed
[31:41]
to eliminate a combined manhole that has
[31:45]
a storm sore in the bottom and a
[31:46]
sanitary sore in the top or vice versa
[31:50]
depending on the area. Uh the bur is
[31:53]
very unique in the fact that you had 24
[31:55]
of these um that need to be removed.
[31:57]
Majority are on Avenue F. uh you were
[32:00]
successful in getting a grant uh from
[32:03]
the federal government EPA funding for
[32:05]
the first 500,000. You have another one
[32:08]
pending. Total cost to remove these is
[32:12]
in the uh $6 million range. Um because
[32:16]
they're very deep and they're very
[32:18]
expensive to work on. Um uh so that's a
[32:22]
multi-year project to be completed. The
[32:24]
consent order requires they be be
[32:26]
separated um because it can impact the
[32:29]
sanitary or the storm system. Um so we
[32:32]
have a long-term program put in place
[32:34]
that needs reported on yearly in your
[32:36]
annual report how your progress is going
[32:39]
there. Um you're working on the second
[32:41]
two manholes this year on Avenue D. So,
[32:45]
all three of the um uh 24 taken.
[32:52]
Next on the following page, we're almost
[32:54]
done with sanitary source is
[32:59]
the um
[33:01]
uh second Avenue F. Uh it's one we
[33:04]
applied for and we show uh what the cost
[33:07]
is to go through the um uh the funding
[33:10]
that you have on Avenue F today. um the
[33:13]
engineering cost to clear the uh
[33:16]
engineering and environmental hurdles
[33:18]
because it's federal money. Um you have
[33:20]
to have an environmental clearance and
[33:22]
it's a uh large document in order to
[33:24]
actually get the money from the federal
[33:26]
government. Um the following one is just
[33:29]
future expenditures um that we're
[33:31]
anticipating for uh separation
[33:34]
elimination projects. Again, I
[33:36]
anticipate this to be a 10-year uh
[33:39]
program because you're going to want
[33:41]
grants to complete every one of these
[33:43]
manholes and use maybe a third of your
[33:47]
money and then twothirds of somebody
[33:49]
else's money uh from the federal or the
[33:52]
state government. So, each year we'll
[33:54]
talk about what grants out there and how
[33:56]
to uh knock off a couple more of these
[33:58]
manholes. Well, your total expenditure
[34:01]
for anticipated for uh sanitary sores in
[34:05]
27 is um 2.4 uh million. Um and that's
[34:13]
down from what you have been spending,
[34:14]
but uh if you think about it, your 10%
[34:17]
reduction projects completed and your um
[34:21]
regionalization project will be
[34:22]
completed. So, you're more in a
[34:24]
compliance mode, maintenance mode. So,
[34:26]
that's that's a good thing.
[34:28]
The next section is expenditures on
[34:30]
storm water. Um so you have uh typical
[34:33]
MS4 uh cost um which is about $5,000 a
[34:37]
year. And then the big item that you
[34:40]
have uh is to get your pollution
[34:42]
reduction plans completed. That'll be
[34:44]
your pawn work. Uh you have one pending
[34:47]
now uh to award in 26 um that we're
[34:51]
going to discuss at the next public
[34:52]
works meeting. And then next year we
[34:54]
have $1 million programmed for um
[35:00]
uh MS4 work in your ponds and that'll
[35:02]
complete your permit. Uh the questions
[35:04]
come up is where are you at on
[35:06]
compliance? Uh these will be be
[35:08]
completed a year ago at this point. Um
[35:12]
so by the time the next permit cycle
[35:14]
comes out uh it is it is imperative that
[35:17]
we report that you've completed your
[35:19]
past requirements. Otherwise, uh you're
[35:22]
going to go into a different type of
[35:24]
permit, uh an individual permit, and you
[35:26]
could get another consent order. So, our
[35:29]
goal collectively and my recommendation
[35:31]
is that um if the money is available to
[35:36]
complete all your work in uh 2027, which
[35:40]
I believe it's going to be based on how
[35:41]
we programmed this, um that you complete
[35:44]
all your storm water work. We do have
[35:47]
about a million half dollars worth of
[35:48]
grant requests out there. Um, some of
[35:51]
those you're going to hear about in the
[35:52]
next month. If you get one of those
[35:54]
grants, there is zero question that you
[35:57]
uh uh would not have an issue completing
[36:00]
all the work for your ERP um in 2027.
[36:04]
that puts you in good position because
[36:06]
after you get this cycle completed, the
[36:09]
next large expenditure for MS4s will not
[36:12]
happen until 2030 or 2031 because D
[36:16]
slightly delayed in uh that permit being
[36:20]
uh issued. So,
[36:22]
um next is projects that's been
[36:25]
completed. I have them in green on here
[36:27]
because they're uh one is completed
[36:30]
Woodside. Um the other one is
[36:34]
uh Avenue A um which work is currently
[36:37]
underway uh on it uh Avenue D actually
[36:42]
sorry about that in Cherry Valley which
[36:45]
has been completed. We're just waiting
[36:46]
on uh the paving to be uh a few items to
[36:49]
be addressed there. Um we do show for
[36:53]
item six the MS4 permit. Um once they do
[36:56]
finalize the permit requirements, it
[36:58]
requires an complete study of the burrow
[37:01]
again for a volume reduction plan. Um
[37:05]
which is the next round. The last round
[37:07]
was pollution reduction which meant you
[37:09]
had take sediment out of the water. The
[37:11]
next round is volume reduction uh to
[37:14]
reduce flooding. So as we all know
[37:17]
downstream
[37:18]
uh a lot of people flood. You have
[37:20]
flooding here downstream certain parts
[37:23]
of the community. Um so uh D's uh new
[37:27]
permit cycle is to adjust flooding
[37:30]
through uh volume control. Uh the
[37:33]
question also has come up many of times
[37:35]
in the last 10 years. What's the length
[37:37]
of this permit MS4? Uh it's 50 years in
[37:41]
the new cycle. um they are requiring 88
[37:46]
to 90% of the storm water that comes off
[37:50]
of the public roads to be addressed um
[37:53]
with volume control. Today the burrow
[37:55]
probably has 5% if that is being
[37:58]
addressed. The community system is 100
[38:01]
years old. Storm water was non-existent
[38:04]
when this system was put in. There was
[38:06]
no ponds. Um it's direct release into
[38:09]
the stream. Um therefore they finally
[38:12]
from the engineering side gave us the
[38:15]
answer that it is going to be a 50-year
[38:17]
permit. Uh they'll probably extend it to
[38:19]
55 or 60 years. Obviously well beyond
[38:22]
everybody's 10ear init. Uh but at least
[38:25]
we know now that this isn't a next 5year
[38:29]
cycle and then it's done or another
[38:30]
5year cycle and it's done. The the thing
[38:34]
that's nice that I've read so far about
[38:36]
the permit and the research that we've
[38:38]
done into it is they are going to give
[38:40]
you a lot of credit for what you've
[38:41]
currently did. So the next 5 years you
[38:45]
won't have to build as much as you did
[38:46]
with this cycle. Um but over time you're
[38:51]
still going to do something in every
[38:53]
road in the municipality. So, um,
[38:58]
yes,
[38:59]
» The storm water on roads is partly
[39:02]
affected by water that flows to us from
[39:05]
our neighbors above us. How does that
[39:09]
affect our obligation to reduce volume?
[39:12]
» We take them out of the equation. Um,
[39:14]
it's just um your water that lands
[39:17]
within the burrow. The water that's
[39:20]
being conveyed through from somebody
[39:22]
else, they have their own permit.
[39:24]
» Okay. So, for example, runoff from the
[39:27]
uh Yoast uh shopping center with the
[39:31]
Propel School,
[39:32]
» You see cascading water coming down
[39:34]
there. Anytime it rains into our area,
[39:37]
it comes right down into our town. Uh
[39:40]
so, we would not be charged for that
[39:41]
water. There's some way they can figure
[39:43]
out how much of that goes really to
[39:45]
Bradock Hills or Bradock.
[39:46]
» Yeah, they'll have their own permit,
[39:48]
those communities, and they have to
[39:50]
address whatever's tributary to their
[39:52]
road. So, Okay. Thank you.
[39:55]
Um
[39:56]
so storm water for 2027 is a
[39:59]
million50,000.
[40:02]
So if you add the two numbers together
[40:04]
they come up to around 3.5 3.6 million
[40:08]
um for next year's expenditures
[40:10]
uh revenue in is 4.2.
[40:15]
Um, so all things being equal, we should
[40:20]
be able by the end of next year to set
[40:22]
some money aside for the next capital
[40:25]
projects. Um because the goal long term
[40:28]
is that you have a
[40:31]
amount of money setting in escrow
[40:34]
um that you can if you have a
[40:38]
significant problem in a sanitary system
[40:40]
or the storm system, you're not looking
[40:43]
at borrow money to to fix that. So, um,
[40:47]
we like to see that the capital fund
[40:49]
builds up to a half a million dollars
[40:52]
because if you have one slide in the
[40:54]
municipality that takes out one sanitary
[40:57]
sore, you will spend a half a million
[40:59]
dollars in a month to fix that. So, uh,
[41:02]
currently, uh, you haven't had that
[41:04]
luxury in order to do that because of
[41:07]
all these consent orders and permits
[41:10]
that they're both going to take a little
[41:11]
breath about the same time. So you'll be
[41:14]
able to catch up over the next 3 years
[41:16]
and get an accounts with a a set aside
[41:19]
so you have an emergency fund and
[41:21]
complete maintenance on the system. So
[41:24]
you get away from having emergencies and
[41:26]
backups and sores that are overflowing,
[41:28]
things like that. So, any questions on
[41:31]
storm and sanitary because that's its
[41:33]
own fund and uh that's a summary of the
[41:37]
capital projects that we've talked about
[41:40]
throughout the years uh with the public
[41:42]
works committee. This is the first year
[41:44]
that we're knocking off a bunch of
[41:46]
projects and there's some we're going to
[41:48]
talk about at the next public works
[41:50]
meeting to give a description on what
[41:51]
they are. So,
[41:54]
any questions on that?
[41:57]
Just to make note for everyone, this
[41:59]
will also be further discussed at the
[42:01]
October 21st budget meeting regarding
[42:03]
other funds.
[42:06]
» Uh next is um Avenue D uh project. Uh it
[42:11]
is a storm water project, but it's going
[42:13]
to be completed this year. Um uh so it
[42:16]
is not listed above as potential
[42:18]
expenditures in 2027.
[42:23]
um roadways and public safety. Uh
[42:27]
little restroom project we talked about
[42:30]
um approximate cost 100,000 um at the
[42:34]
public works building um for a restroom
[42:38]
uh lunchroom and fixing the oil area. Um
[42:42]
most of that work is going to be
[42:43]
completed by public works and uh 20,000
[42:47]
for preparation of your MEP plans, your
[42:50]
plumbing plans, electric plans,
[42:52]
architectural plans to get all those
[42:54]
permits and then I believe everything
[42:57]
but the electrical is proposed that
[42:59]
public works can do. So those costs will
[43:02]
likely come down from 100 because this
[43:04]
is block work, uh some framing work, uh
[43:07]
a little bit of plumbing work, a little
[43:08]
bit of electrical work. Um, but I think
[43:11]
we want to have a safe number in there
[43:12]
for your budget in case something needs
[43:15]
bid out. Um, and then if we're under
[43:17]
budget, that's great for everybody at
[43:19]
the end. Um,
[43:22]
uh, next is two projects that's
[43:24]
completed. The last one is the, uh,
[43:27]
steps project that it was just awarded
[43:30]
and the expenditure in 27. Uh, I expect
[43:33]
to be close to that 230. They are going
[43:36]
to get started in the fall here, but we
[43:38]
may not get a bill until December, which
[43:40]
means it'll be completely carried over
[43:43]
into the year 2027 budget. Uh 2026
[43:47]
roadways is nearly complete. Um they
[43:50]
have a few uh punch lists left. Um so
[43:52]
that project will be completed in 26.
[43:55]
And then I do show the last item um 2027
[43:59]
road paving. I use the uh 300,000 as a
[44:04]
uh benchmark. uh start discussions and I
[44:07]
did hand out uh the other sheet which
[44:09]
was the list of roadways
[44:12]
um based on their rating what was next
[44:15]
to be in the base bid and the orange
[44:17]
would be at alternates. Um this will be
[44:20]
discussed at the next public works
[44:22]
meeting and I'm sure there'll be more to
[44:24]
come on it after we have that meeting.
[44:27]
Uh I also did bring the public works
[44:31]
sketch. Uh I'll hand this out at the end
[44:33]
for council. So you have what that
[44:35]
100,000 is. Um this would be a pretty
[44:37]
major improvement for your public works
[44:39]
crew based on uh again that building's
[44:42]
been there probably 50 years. Uh hasn't
[44:45]
had a lot of TLC. Um uh so they are the
[44:48]
uh bread and butter of what happens with
[44:50]
the uh community during snowstorms,
[44:53]
during bad weather events and having a
[44:55]
better facility for them, easier to
[44:57]
maintain the vehicles um is something
[45:00]
that's being has been discussed with the
[45:02]
public works committee. Um, so it's
[45:04]
something for your consideration. Uh, so
[45:06]
we'll hand that out at the end here. Uh,
[45:08]
any questions on any of that.
[45:12]
Sorry I took so long, but a lot of items
[45:14]
for uh, uh, for council.
[45:16]
» Mr. Just for clarification on that last
[45:19]
item for the public works building. Not
[45:20]
only is there a matter of renov like a
[45:23]
renovation, but also we're talking
[45:25]
accessibility as well as safety.
[45:27]
Correct.
[45:27]
» Correct. Yeah. And we address all three
[45:30]
things with this renovation which is uh
[45:32]
highly suggested.
[45:41]
All right, we'll uh move on to the uh
[45:44]
public comment uh section. Uh this is
[45:47]
for agenda and non-aggenda items. At
[45:50]
this time, only residents and taxpayers
[45:52]
of the Burrow of Forest Hills will be
[45:54]
permitted to address council on any
[45:56]
issue, whether appearing on today's
[45:57]
agenda or not. Speakers will be
[45:59]
permitted to speak for a maximum of 5
[46:01]
minutes. Groups of people will be
[46:03]
required to designate a spokesperson to
[46:05]
represent them who may speak for a
[46:07]
maximum of 10 minutes. Speakers are
[46:10]
asked to use the microphone at the
[46:11]
speaker stand, clearly state your name
[46:13]
and spell it, and state your address for
[46:15]
the record. If you have any documents to
[46:18]
share with council members, you may
[46:20]
present them to the burough manager.
[46:21]
Now, council president will determine
[46:24]
how those materials will be distributed
[46:26]
and viewed for the meeting. Speakers are
[46:29]
reminded that council uses these comment
[46:31]
periods as opportunities to gather
[46:32]
information and not to respond directly
[46:35]
to concerns raised. Information gathered
[46:38]
will not be discussed at the meeting,
[46:39]
but instead will be referred by the
[46:41]
council president to the appropriate
[46:43]
committee for review and discussion at
[46:45]
the next committee meeting. If it is not
[46:47]
a matter for deliberation by a
[46:49]
committee, but requires more immediate
[46:51]
attention, it will be referred to the
[46:53]
burough manager who will respond by
[46:55]
phone and/or email within five business
[46:58]
days following this meeting. Do we have
[47:00]
any speakers this evening?
[47:11]
Bill Tamasic 140 Tang would drive.
[47:14]
I come here to address an issue again
[47:17]
since I've been doing it since January
[47:20]
the 28th about these committee meetings
[47:23]
being closed to the public, meaning
[47:27]
they're prohibited from coming to these
[47:29]
meetings.
[47:31]
Um,
[47:32]
I come to these meetings. I watch them.
[47:34]
I listen to people comment. I talk to
[47:37]
neighbors. You know, like somebody says
[47:39]
they do talk to neighbors. Well, I don't
[47:41]
know what they're talking about because
[47:43]
not one
[47:45]
» Has said to me that they are in favor of
[47:48]
what this council is doing. Not one. Not
[47:52]
one person said it's a good thing that
[47:55]
the public can't come to these committee
[47:57]
meetings.
[47:59]
For real?
[48:01]
Is this for real? that we still have
[48:04]
four people on this council that refuse
[48:08]
to listen to the will of the people.
[48:12]
They listen to Bio and Lawrence because
[48:16]
those two for sure and Lawrence even
[48:19]
made the statement he doesn't want the
[48:21]
public at these meetings. And that's why
[48:24]
I've used the word weasel even though
[48:27]
people have said Bill that terminology
[48:29]
isn't really good. Where I grew up, you
[48:32]
call a spade a spade and a weasel a
[48:34]
weasel.
[48:37]
So
[48:38]
your job is to service us.
[48:42]
Excuse me. Am I interrupting something
[48:44]
here?
[48:45]
» And then to stop the name calling that
[48:48]
enough.
[48:48]
» This is what you call free speech. You
[48:50]
understand what free speech is?
[48:52]
» Yeah, but there's no reason.
[48:53]
» Excuse me.
[48:54]
» I'm going to reclaim my thought.
[48:56]
» Excuse me. uh re please refrain from the
[48:59]
name calling or you will be asked to
[49:01]
leave.
[49:03]
» So moving forward, we'll deal with that
[49:05]
later on. Moving forward,
[49:08]
we have a situation
[49:11]
that occurred on January 28th.
[49:14]
I called Barb Martin or sent an email to
[49:17]
Barb Martin Barton and said to her
[49:19]
specifically, "Can
[49:22]
I come to a committee meeting?"
[49:25]
She says, "Bill, here's the date t date,
[49:29]
time, and place." Fine. Later in that
[49:32]
same day, I get an email back from her.
[49:36]
And before it's over, there are four
[49:38]
people on that list. Drasta, Lawrence,
[49:42]
Baioke, and Martin. And during this
[49:46]
time, they kept telling me, I can't come
[49:48]
to the meeting. This reason, that
[49:51]
reason, three people, the law, etc. But
[49:54]
let me take you back to January 6th
[49:57]
where you were all present.
[50:00]
Mr. Bacon asked after all this stuff,
[50:04]
can public be invited
[50:07]
if they have specific information to
[50:09]
contribute, Mr. Lawrence, there is
[50:13]
nothing to prevent the committee chairs
[50:16]
from inviting members of the public.
[50:20]
Well, I'll be
[50:24]
I'll be now after that meeting or after
[50:27]
those emails I should say. I called her
[50:30]
and said, "Barb, what's going on?" And
[50:32]
she said, "Bill, we got a new council. I
[50:35]
have to get along with these guys and I
[50:37]
don't want to cause any trouble." And
[50:39]
then I suggested to her that she stay
[50:41]
out of this. And by the way, these els
[50:45]
are all documented.
[50:47]
They're all documented.
[50:50]
Okay? We can find them. So, why is it
[50:54]
that these three guys, in my opinion,
[50:57]
pressured B Martin
[51:00]
to uninvite me to the meeting? Because
[51:02]
they're all on it, too. And it doesn't
[51:05]
say
[51:07]
anything about the the the president. It
[51:10]
doesn't say anything about the
[51:11]
committee. It says the committee chair
[51:15]
and there will be no problem with that
[51:18]
person coming. So, I'm just wondering
[51:20]
what's going on here.
[51:23]
I'm just wondering what's going on.
[51:26]
Can you explain it to me? I'll stay here
[51:28]
if you want me to. We can talk about
[51:31]
whatever you want. Name calling your
[51:34]
actions. So, I'm going to again say I'll
[51:37]
be here at the next meeting and we'll go
[51:39]
through the same stuff all the way over
[51:41]
again and we will address what we call
[51:43]
free speech at that time.
[51:49]
Thank you. Anyone else?
[51:54]
Okay. Uh we'll move on to our regular
[51:58]
agenda. Uh committee reports. Mr.
[52:01]
Lawrence, operations and policy.
[52:04]
» Thank you, Mr. President. I have no
[52:05]
motions tonight and I have no nothing to
[52:08]
report them to the general topics. Thank
[52:11]
you for your time, Mr. President.
[52:12]
» Thank you, Mr. Lawrence. Finance
[52:15]
Committee. Mr. Theelacer. Thank you, Mr.
[52:17]
President. We have one recommended
[52:19]
motion, and that's a motion to approve a
[52:20]
master services agreement between
[52:22]
payarang aka corp and the burrow for
[52:25]
stills for the execution of vendor
[52:26]
payment services for a period of one
[52:28]
year subject to the solicitor's final
[52:30]
approval. I'm going to ask Miss Watt to
[52:33]
maybe explain explain that to everyone
[52:35]
here. So corp also known as payaring
[52:39]
they were a merger merger of companies a
[52:42]
while back is a digital pay payment
[52:46]
payment vendor third party payment
[52:47]
vendor uh one endeavor of the finance
[52:51]
committee over the last several years
[52:52]
has been to source digital payments in
[52:55]
the year 2026 a large portion of our
[52:58]
payments as the bureau are still through
[52:59]
check which are right for fraud and for
[53:03]
you know other checking schemes that
[53:04]
currently do exist What corpay does is
[53:07]
core pay takes the funds that we execute
[53:10]
through a file. They distribute to our
[53:13]
vendors either through the methods of
[53:15]
check or virtual credit card or AC that
[53:20]
therefore they manage that relationship
[53:22]
with the vendor and they also execute
[53:24]
payment.
[53:26]
The goal is because other communic
[53:29]
communities in the western Pennsylvania
[53:31]
area also utilize this service is that
[53:34]
many of our vendors are the same. Many
[53:36]
of them they've already turned into a or
[53:39]
virtual credit card services. Through
[53:41]
this process, not only do we de become
[53:43]
more efficient and perform risk
[53:46]
management activities to divert fraud in
[53:48]
a small staff, but now we save the money
[53:51]
or have the potential of saving money
[53:53]
from paying for envelopes, check
[53:55]
printing, the labor involved in that as
[53:57]
well as postage. And now we have the
[54:00]
opportunity to earn a either break even
[54:03]
or earn a small rebate by moving
[54:05]
everyone to the AC and virtual credit
[54:07]
card services. We understand that some
[54:09]
check payments may remain for smaller
[54:11]
vendors, but on a whole, this will make
[54:12]
a large shift in the way that we perform
[54:14]
business as a bureau.
[54:19]
» Thank you. And from my general report,
[54:22]
um it was talked about Sorry, question.
[54:27]
M if you could just have a brief
[54:29]
explanation as well of what this would
[54:31]
change for residents whether this is
[54:33]
something they would notice or this is
[54:35]
behind the scenes operations
[54:38]
no change to residents unless for some
[54:40]
reason we would have to pay you through
[54:42]
a refund process of some sort but we
[54:44]
most we don't offer many refunds on a
[54:46]
whole that involve residents. the
[54:49]
biggest change maybe to any resident
[54:50]
that may be a vendor uh such as a great
[54:54]
example would be uh our fitness
[54:56]
instructors things along those lines
[54:58]
that would be a 1099 blade.
[55:00]
» Thank you.
[55:03]
» Little else
[55:05]
you and then from my general report I
[55:07]
think the only thing I have is as part
[55:08]
of the next year's budgetary process and
[55:11]
preparing for that we're doing some
[55:12]
things different with the new bureau
[55:13]
manager and how we conduct the uh budget
[55:16]
preparation process. So you saw some
[55:18]
presentations tonight. We're also having
[55:19]
some specific budget meetings as well,
[55:21]
which we've never really had before,
[55:23]
meetings just on the budget. So those
[55:25]
are available. You know, there's a Zoom
[55:27]
link. They're on YouTube. They're all
[55:29]
public meetings to come discuss and uh
[55:31]
listen in on the the budgetary planning
[55:33]
process. So believe that's all I have.
[55:36]
Thank you, Mr. President.
[55:37]
» Thank you, Mr. Thelacer. Um B property,
[55:40]
Mr. Bacon.
[55:42]
» Thank you, Mr. President. Uh we do have
[55:44]
a recommended motion that we'd like to
[55:45]
place on the business meeting agenda uh
[55:48]
which is to authorize the bro manager to
[55:50]
apply for the Birdtown 2026 miniigrant
[55:53]
program which is provided by the DCNR
[55:56]
environmental stewardship fund and this
[55:58]
would be for $1,000 on behalf of the
[56:01]
burough and the environmental advisory
[56:04]
council.
[56:06]
We met with uh several of the involved
[56:08]
uh EAC people in the last property
[56:12]
committee meeting. Um and I think they
[56:14]
have a very realistic scope for this and
[56:17]
we recommend moving forward as a
[56:19]
committee.
[56:21]
» Anybody have any questions?
[56:25]
» Do have one item note and this is my
[56:27]
error. Um the next meeting is on
[56:29]
September 16th. Uh the deadline for this
[56:32]
grant is actually September 15th and
[56:35]
this is I do apologize for this. So if
[56:37]
we would like to move forward with this,
[56:39]
we would have to amend to make that an
[56:40]
actual motion.
[56:44]
» Okay. So I believe I would move to amend
[56:47]
the agenda tonight to include this as a
[56:49]
motion. Is that correct?
[56:52]
» Second that.
[56:57]
So, can we have a voice vote uh for that
[57:01]
uh going on the agenda this evening? All
[57:03]
in favor say I.
[57:04]
» I opposed.
[57:08]
» Motion carries.
[57:11]
» Okay. And now that that is on the
[57:13]
agenda, I move to authorize the burough
[57:16]
manager to apply for the Birdtown 2026
[57:18]
miniigrant program provided by the DCNR
[57:20]
environmental stewardship fund in the
[57:22]
amount of $1,000 on behalf of the bureau
[57:24]
and its environmental advisory council.
[57:26]
Second
[57:28]
» Questions or comments?
[57:32]
Have a voice vote, please. All in favor
[57:33]
say I. I
[57:38]
motion carries.
[57:42]
Thank you everyone. As a general report,
[57:44]
I have two items uh just to bring to
[57:46]
everyone's attention that the burough
[57:48]
property committee was discussing this
[57:50]
month. Uh one of them is that there is
[57:53]
an EV charger program that connect um
[57:58]
and other entities are offering. We
[58:01]
discussed it as something that is
[58:02]
probably out of scope for anything the
[58:04]
bureau would really have plans for at
[58:07]
the moment. Um but it is actually
[58:09]
something that can be acted upon by
[58:12]
private businesses. Uh so for example uh
[58:16]
maybe one of the shopping plaza owners
[58:18]
could apply for this program and get 80%
[58:21]
of the cost covered for some uh uh level
[58:26]
three fast chargers or something like
[58:29]
that. Um and then at the end of 5 years
[58:33]
they want they have to pay 20% and at
[58:35]
the end of 5 years they wind up owning
[58:37]
the whole thing which could be highly
[58:39]
advantageous for them uh for getting a
[58:42]
whole lot of money. So uh I think we
[58:45]
just are going to try and pass along
[58:47]
this information. Perhaps Mayor DeMarco
[58:49]
can lead the way in this just in hopes
[58:51]
that maybe uh one of our bro
[58:54]
not burrow property owners but property
[58:57]
owners within the burrow might find this
[59:00]
interesting and useful if they were
[59:02]
perhaps on the fence of such a thing
[59:04]
would be beneficial.
[59:05]
» Thank you. I'd be happy to do that.
[59:08]
The other item is uh we were discussing
[59:11]
uh Cliffwood Park and also discussing uh
[59:14]
the possibility of community gardens in
[59:17]
the future and I think we had a very
[59:19]
productive conversation where a couple
[59:22]
of our community um garden advocates had
[59:25]
actually taken a look at Cliffwood Park
[59:27]
and we think that uh as the burough uh
[59:32]
property committee that it would
[59:33]
actually be a very promising
[59:36]
uh site.
[59:37]
for a pilot test program of a small
[59:41]
community garden. Uh they proposed for 2
[59:44]
years, give it a try. Um so we're not
[59:47]
ready to propose anything quite yet, but
[59:49]
I want to let council know as I think we
[59:51]
are going to seek some opinions of
[59:53]
residents in the area as it's a very
[59:56]
small community. Um it's kind of its own
[59:59]
isolated part of the burrow which has
[1:00:01]
several bonuses for having options of a
[1:00:04]
community garden. So, we should have
[1:00:06]
more on that. I expect we will have uh
[1:00:09]
some sort of recommended motion next
[1:00:11]
month once we've gathered more
[1:00:13]
information. And if you had thoughts on
[1:00:14]
that, please let us know. Unless there
[1:00:17]
are further questions, that concludes
[1:00:19]
Burough Property.
[1:00:20]
» Thank you, Mr. Bacon.
[1:00:22]
Planning and zoning. Miss Lewis is not
[1:00:24]
here. Do we have someone that can cover
[1:00:27]
that for her?
[1:00:29]
» I don't think we have anything. Mr.
[1:00:31]
Brett, do you have anything under
[1:00:32]
planning and zoning separate from your
[1:00:34]
report earlier? Nope. Nothing. I got
[1:00:37]
That's it then.
[1:00:38]
» Thank you, Mr. Stelacer.
[1:00:43]
» Next item is public works committee.
[1:00:45]
Miss Martin
[1:00:51]
would uh Mr. D. Costa.
[1:00:53]
» Sure. We have a recommended motion to
[1:00:55]
adopt ordinance number 1129 to prohibit
[1:00:58]
parking at all times on the west side of
[1:01:01]
Atlantic Avenue between Cook Park and
[1:01:03]
Marian Avenue. Establish one-way
[1:01:06]
roadways on Wilkins Road and Pacific
[1:01:09]
Avenue. Amend speeds posted on certain
[1:01:12]
burough roadways and amend the burough
[1:01:14]
street map to rename service roads and
[1:01:17]
unnamed alleys.
[1:01:20]
This has been in the works for a long
[1:01:22]
time. We're finally getting it to a
[1:01:24]
closure here. So, are there any
[1:01:26]
questions?
[1:01:27]
» We we discussed this. This was um put
[1:01:30]
out for u advertisement and now that it
[1:01:34]
has been advertised now we're
[1:01:36]
» Finalizing it official.
[1:01:37]
» Yeah.
[1:01:39]
» If if I could one question I think and I
[1:01:42]
could be wrong but this is just updating
[1:01:44]
a bunch of current separate ordinances
[1:01:46]
into one ordinance. It's not changing
[1:01:48]
anything necessarily. It's just putting
[1:01:50]
them in one ordinance instead of
[1:01:51]
multiple separate ordinances.
[1:01:53]
» No, there's some changes.
[1:01:55]
» Changes. There are changes.
[1:01:56]
» Yeah.
[1:01:58]
Yeah. Yeah. Yeah. The name in the alleys
[1:02:01]
the traffic
[1:02:02]
» Control measures are um
[1:02:07]
» They've been deployed I guess but not
[1:02:09]
enforced.
[1:02:10]
» Yeah. Yeah.
[1:02:13]
» All right. Um we also are recommending a
[1:02:16]
motion to accept or reject the 2627
[1:02:19]
SHA COG purchasing alliance rock salt
[1:02:23]
rebid results. Um, so from what I
[1:02:26]
understand, um,
[1:02:29]
we are, um, we're still going through
[1:02:31]
bids on some of those. Is that
[1:02:33]
» I'd be happy to take it from here if you
[1:02:35]
don't mind. So, yeah. So, we we carry
[1:02:37]
two cooperative purchasing agreements
[1:02:41]
with co-stars, which is on the state
[1:02:42]
level, and Shayog, which is regional.
[1:02:44]
Uh, the reason we carry two is diversify
[1:02:48]
vendors and supply. If anyone heard in
[1:02:49]
the news last year, there was issues
[1:02:51]
with supply with salt. We carry two of
[1:02:53]
them also for to secure separate pricing
[1:02:56]
as well in the case of what I'm going to
[1:02:57]
explain next. Current last year the
[1:03:00]
contract that we had through Shaycog was
[1:03:02]
at approximately $88 per ton. Uh this
[1:03:06]
year the current bid came in at60 near
[1:03:09]
$160 per ton. That is a almost 100 that
[1:03:13]
is over 100% increase almost 100%
[1:03:16]
increase right there. The question right
[1:03:18]
now is do we accept that to maintain
[1:03:21]
supply or do we diversify with a
[1:03:27]
individual contract in with a vendor
[1:03:30]
because right now co-stars and shake
[1:03:33]
would be the same vendor which would not
[1:03:34]
diversify diversify our supply chain. We
[1:03:38]
are still evaluating our public works
[1:03:41]
foreman is still evaluating what our
[1:03:43]
other options are because under these
[1:03:45]
contracts we have a minimum to purchase.
[1:03:47]
So we would be locking in a certain
[1:03:48]
amount at that increased uh price per
[1:03:51]
ton. So we will have more information
[1:03:53]
for you ahead of next meeting but we
[1:03:55]
have to make a decision on this because
[1:03:57]
October 10th uh we are we must have a
[1:04:00]
response back on the Shayog contract.
[1:04:04]
You are not the only municipality that
[1:04:06]
is addressing this in this fashion.
[1:04:08]
» Well, many are rejecting because of
[1:04:10]
this, but we have multiple factors in
[1:04:13]
the east side. We have a lot more
[1:04:14]
factors to consider than some of the
[1:04:16]
other regions of the city of the county.
[1:04:19]
» Thank you.
[1:04:21]
This is the cross.
[1:04:23]
So, we also have a motion to approve
[1:04:25]
change order number one of contract
[1:04:27]
number 25 SW1 Forest Hills Park PRP
[1:04:31]
project with Kronin Enterprises LLC.
[1:04:35]
Uh, Mr. Brett, did you want to comment
[1:04:37]
on that?
[1:04:37]
» Yeah, it's uh for asbelt quantities uh
[1:04:40]
on the project and then their final bill
[1:04:42]
will
[1:04:44]
» And another motion to approve change
[1:04:46]
order number two. This is a final change
[1:04:48]
order of contract number 251
[1:04:51]
2025 roadway improvement program with a
[1:04:55]
Liberon Inc.
[1:04:58]
» Any [clears throat] questions about
[1:04:59]
that?
[1:05:00]
» Same deal there. And it's a uh reduction
[1:05:02]
as well.
[1:05:05]
» No general report on this. Oh yes, Mr.
[1:05:08]
Bacon.
[1:05:09]
» Um I think a question for Mr. Brett just
[1:05:11]
to confirm we didn't miss anything
[1:05:13]
between burrow property and public
[1:05:14]
works. There was the change order for
[1:05:17]
the um the grant uh area over by Arnold.
[1:05:23]
» Yes, we will have that for the agenda.
[1:05:26]
Um it'll be to take you up very close to
[1:05:30]
the total amount of the grant, just
[1:05:32]
slightly under. So, um we're going back
[1:05:35]
and forth at Liberon on the last piece
[1:05:36]
of it. So, it's about a $80,000
[1:05:40]
change order to spend the rest of the
[1:05:42]
money uh on the steps in that area.
[1:05:44]
We'll have that in the next day or so.
[1:05:47]
» So, should we assume that would be a
[1:05:49]
motion in one of those sections? I think
[1:05:52]
we've been consistently doing burough
[1:05:54]
property.
[1:05:54]
» Yeah. Okay.
[1:05:56]
» Yes, we we'll need to have that in uh I
[1:05:58]
want to have it signed by them before
[1:06:00]
you take action.
[1:06:01]
» Okay.
[1:06:02]
» We should have it for your meeting.
[1:06:03]
» Okay. Thank you.
[1:06:06]
» That's it. General report.
[1:06:08]
» Okay. Thank you. You're up again. Public
[1:06:10]
safety.
[1:06:11]
» Yes. So, we have a recommended motion to
[1:06:13]
adopt uh resolution number 1308
[1:06:16]
approving the 2026 edition of the
[1:06:19]
emergency operations plan of the bur of
[1:06:21]
burough forest hills, Alageney County,
[1:06:23]
Pennsylvania. Um so, um all of our first
[1:06:26]
responders and the mayor met um to
[1:06:29]
discuss some of the holes and updates to
[1:06:32]
the emergency operations plan. Um, so,
[1:06:35]
uh, Miss Watt has been, you know,
[1:06:37]
dealing with sort of a final version of
[1:06:39]
that and, uh, we hope to have something,
[1:06:41]
you know, to approve in the next
[1:06:43]
business meeting.
[1:06:47]
Have no general report at this time. I
[1:06:49]
do have a piece of new business I'll
[1:06:51]
bring up in the next section.
[1:06:52]
» Thank you, Mr. Drasta.
[1:06:55]
» Okay. Uh, we're on to old business,
[1:06:58]
which we have none. Under new business,
[1:07:00]
we have five recommended motions. Who
[1:07:05]
would like to tackle that?
[1:07:07]
» Before you get to those, could I bring
[1:07:09]
up a conversation that I had with Yeah.
[1:07:11]
So, with Chief, um, he is asking, so
[1:07:15]
we've already requested this money in
[1:07:17]
the upcoming budget. um pretty sure that
[1:07:19]
would be adopted, but he has the need to
[1:07:22]
start the process on purchasing a new
[1:07:24]
VIA police vehicle for the next uh
[1:07:27]
budget year and would like to get
[1:07:28]
started on that um as soon as he can.
[1:07:32]
So, by the time the car shows up, it
[1:07:34]
will be the new budget year. I'm not
[1:07:36]
sure how that would work, if that needs
[1:07:38]
to be in the new business or at the next
[1:07:40]
business meeting or if we have to wait
[1:07:42]
until the budget is approved to go
[1:07:44]
through that. So, I just wanted to bring
[1:07:46]
that up.
[1:07:48]
Just to clarify, I think we were talking
[1:07:50]
about Mr. Cross. So, we were talking
[1:07:52]
about the purchase of the vehicle that
[1:07:54]
was already approved. Correct.
[1:07:56]
» Um Um No, I don't believe this one was
[1:07:59]
approved.
[1:08:02]
» 27 vehicle that was obviously has to be
[1:08:06]
ordered in 2026.
[1:08:08]
I'm not sure if you did approve that or
[1:08:10]
didn't. We'd have to look back and see.
[1:08:12]
All I'm looking for at this particular
[1:08:13]
time is the option to make
[1:08:16]
the purchase legal with the person who's
[1:08:19]
going to provide us the vehicle. So
[1:08:22]
basically, I want to place an order with
[1:08:23]
them to order the vehicle that probably
[1:08:26]
in the end never gets here until after
[1:08:28]
January, which would be the part of the
[1:08:30]
27 year. And that would be a 27 vehicle
[1:08:33]
as well.
[1:08:36]
to look back to see if we've already
[1:08:37]
approved this or not, but I'm not if we
[1:08:39]
haven't, I'm not sure what the next step
[1:08:41]
would be.
[1:08:43]
» Yeah, we we need to look uh I'm pretty
[1:08:46]
sure that we did approve uh the purchase
[1:08:50]
for for if it was for last year or for
[1:08:53]
the current year. Hey, that's my
[1:08:55]
problem. We we but we did approve a
[1:08:57]
purchase that and we did we did or did
[1:09:00]
not make the uh
[1:09:03]
purchase
[1:09:05]
this year.
[1:09:07]
» We did that one. Yes, we received the
[1:09:08]
one we ordered last year, we received it
[1:09:10]
this year. Just the same situation here
[1:09:13]
where we order it this year, but we
[1:09:15]
don't get it till next year. And you
[1:09:17]
know, there's always a delay in these
[1:09:19]
things and you know, police vehicles are
[1:09:21]
set on a certain track where they they
[1:09:24]
put them in at a certain time and they
[1:09:26]
do all the police vehicles at once and
[1:09:27]
usually it's at the end of the year like
[1:09:29]
this, but we need to place our order to
[1:09:31]
let them know what we want so that we
[1:09:33]
can get it in that timely fashion
[1:09:35]
hopefully, which isn't really timely
[1:09:37]
when you say it's going to be January,
[1:09:38]
but that's how it work.
[1:09:41]
» If I may, Mr. Corbal though to reserve
[1:09:44]
or place an order. We do not have to
[1:09:46]
make a formal motion. We can just
[1:09:47]
authorize that. But to make the actual
[1:09:49]
formal motion and enter in the purchase
[1:09:51]
agreement, that is what we would do in
[1:09:53]
2027.
[1:09:54]
» Yeah.
[1:10:00]
» Yeah. That's all I have. Thank you.
[1:10:02]
» Okay. Now, on to the recommended
[1:10:05]
motions. These five. Would uh Miss Lot
[1:10:09]
would you care to
[1:10:11]
» I'll be happy to I'll be happy to review
[1:10:14]
them and then
[1:10:16]
a member of council will make the motion
[1:10:18]
at the formal meeting. The first three
[1:10:20]
are related to our minimum municipal
[1:10:22]
obligations or MMOs. For those that are
[1:10:24]
not familiar, as a part of defined
[1:10:26]
benefit or defined contribution plans,
[1:10:29]
we're required to set aside amount
[1:10:30]
determined by our actuaries to bring us
[1:10:33]
to a a certain amount to fulfill the
[1:10:36]
plan. uh to a certain funding
[1:10:38]
percentage. There are three on here
[1:10:39]
because we have the defined benefit
[1:10:41]
pension plan for our police pension. We
[1:10:43]
have that for our non-uniform defined
[1:10:45]
benefit and for our non-uniform defined
[1:10:47]
contribution.
[1:10:49]
The minimum municipal obligation for the
[1:10:52]
pension plan for police is $65,263.
[1:10:57]
This would bring us to a required
[1:10:58]
funding percentage. The
[1:11:02]
for the non-uniform defined benefit, we
[1:11:04]
have an amount of zero. We are at a
[1:11:06]
funding status, but we also have started
[1:11:09]
to phase out this plan to the defined
[1:11:11]
contribution which is next. The defined
[1:11:14]
contribution one on the other hand is
[1:11:15]
$25,656
[1:11:18]
that is set at the rate of that we have
[1:11:20]
determined as contributions for
[1:11:21]
employees and these are made on an
[1:11:23]
ongoing basis. The MMO for the defined
[1:11:26]
benefit for police though on the other
[1:11:27]
hand is made in a lump sum generally
[1:11:29]
after state fund or state aid is
[1:11:31]
received. We are required as
[1:11:33]
administrative officials to present this
[1:11:35]
to council and have them make a motion
[1:11:37]
to accept uh so that everyone is aware
[1:11:40]
that these are occurring as well and we
[1:11:42]
must sign off after the meeting and
[1:11:43]
provide proof of such. Are there any
[1:11:46]
questions on those three motions?
[1:11:50]
» Um one, two, three, and five should
[1:11:55]
probably go under finance.
[1:11:57]
» Yep.
[1:11:58]
And the number four would be under
[1:12:02]
operations
[1:12:07]
» To four me.
[1:12:09]
» Can I move on to four?
[1:12:09]
» Yes. Okay.
[1:12:10]
» Of course. Sorry you you hadn't talked
[1:12:12]
about that, but four should go ups.
[1:12:15]
» Four will go under UPS. Okay. So for
[1:12:18]
number four, that would be a res
[1:12:19]
resolution amending the
[1:12:20]
intergovernmental cooperation agreement
[1:12:22]
with Wilkins Township for joint
[1:12:23]
operation of the sewer vector truck. We
[1:12:25]
have this A in place. However, in a
[1:12:28]
review, we carry the insurance currently
[1:12:30]
in this round of sharing the equipment
[1:12:34]
for the sewer truck. This is simply
[1:12:36]
tidying up the language to codify the
[1:12:40]
fact that we split these costs as well
[1:12:42]
as the fact that in the event of an
[1:12:45]
incident that the in the group or I
[1:12:49]
should say the organization operating or
[1:12:52]
housing or taking responsibility for the
[1:12:54]
vehicle at the time would also be
[1:12:55]
responsible for the deductible. To this
[1:12:58]
point in this agreement, we have never
[1:13:00]
had an incident. However, this would
[1:13:02]
clearly distinguish who is responsible
[1:13:04]
for what and when. and essentially
[1:13:07]
codifies what our operations have been
[1:13:08]
to date. Otherwise,
[1:13:11]
Wilkins would present this later in the
[1:13:13]
month as well.
[1:13:18]
» All right. Um number five, this is an
[1:13:21]
ordinance to amend the uh non-uniform
[1:13:24]
employee pension plan. Um
[1:13:27]
[clears throat]
[1:13:28]
the uh plan administrator discovered a
[1:13:30]
gap in the plan. um nothing to be
[1:13:33]
concerned about. But um basically when
[1:13:36]
the bureau contributes money to the plan
[1:13:38]
on behalf of an employee, sort of the
[1:13:40]
match, if you will, that money cannot be
[1:13:43]
removed from the plan. It must stay
[1:13:45]
there under law. Um and we did not have
[1:13:47]
a provision as to how those dollars were
[1:13:50]
treated. So this amends the plan to say
[1:13:52]
that those dollars remain in the plan
[1:13:54]
and they are credited towards a future
[1:13:57]
contribution that the bureau may need to
[1:13:59]
make on behalf of an
[1:14:02]
if there's an extra $100 in there and
[1:14:04]
employee B's match this month was $100,
[1:14:07]
we can just credit that without actually
[1:14:09]
making the contribution. Very um simple
[1:14:13]
but necessary change. So that'll be on
[1:14:16]
for a motion to advertise and uh you all
[1:14:19]
will consider it'll be for your
[1:14:21]
consideration in October.
[1:14:25]
» Anyone else? Any questions?
[1:14:30]
» No. Okay. Our next schedule I did have
[1:14:34]
one thing I wanted to mention
[1:14:36]
» Decision. We have to amend the agenda
[1:14:37]
for this.
[1:14:38]
» Okay.
[1:14:38]
» That's right. That's exactly right. So,
[1:14:40]
first I want to announce that council um
[1:14:42]
held an executive session um prior to
[1:14:44]
this meeting to discuss uh legal issues
[1:14:48]
uh personnel issues, collective
[1:14:50]
bargaining um and to receive the advice
[1:14:53]
of the solicitor and will be meeting in
[1:14:55]
ad uh following the meeting the next
[1:14:58]
meeting on September 16th to discuss
[1:15:01]
collective bargaining. And then we do
[1:15:03]
have a a motion that to amend the agenda
[1:15:06]
again for another motion
[1:15:10]
be considered this evening.
[1:15:19]
And this is a motion um to allow the
[1:15:22]
burrow manager to enter in a contract in
[1:15:26]
into a contract with Orion the Omazing
[1:15:31]
for services to be rendered at the 911
[1:15:34]
commemoration event in the amount of
[1:15:37]
$500.
[1:15:39]
would be a at this point a motion to
[1:15:41]
amend to add that motion that the
[1:15:45]
president read to the agenda.
[1:15:50]
Does anyone want to make the motion?
[1:15:54]
» Okay, Mr. Lawrence,
[1:15:58]
anyone second?
[1:16:00]
» Okay,
[1:16:02]
any questions or comments?
[1:16:05]
Hey, we'll have a voice vote, please.
[1:16:07]
All in favor say I. I opposed.
[1:16:12]
Motion passes.
[1:16:14]
Now we need a
[1:16:16]
motion.
[1:16:19]
Okay, good. I didn't want to have to
[1:16:21]
read it again. Okay. Does uh someone
[1:16:23]
want to make the motion to
[1:16:27]
enter into the contract?
[1:16:31]
» I'll make the motion to enter into the
[1:16:33]
contract.
[1:16:36]
» One second.
[1:16:37]
» Second.
[1:16:38]
Okay, I have a voice vote, please. All
[1:16:41]
in favor say I. I.
[1:16:44]
» Opposed.
[1:16:46]
Motion carries.
[1:16:49]
Okay, I believe that concludes our
[1:16:52]
business this evening. Our next
[1:16:54]
scheduled council meeting will be
[1:16:56]
Wednesday, September the 7 16th at 700
[1:17:00]
p.m. here in council chambers. Um unless
[1:17:04]
there's any objection this meeting will
[1:17:07]
be adjourned
[1:17:10]
hearing none this meeting is now
[1:17:11]
adjourned.
[1:17:16]
Stop.