Agenda
Agenda: https://freeborncomn.api.civicclerk.com/v1/Meetings/GetMeetingFile(fileId=896,plainText=false)
Full agenda packet (agenda plus every staff report and attachment): https://freeborncomn.api.civicclerk.com/v1/Meetings/GetMeetingFile(fileId=897,plainText=false)
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:03]
I pledge allegiance to the flag
of the United States of America
[0:08]
and to the Republic for which
it stands, one nation under God,
[0:13]
indivisible, with liberty
and justice for all.
[0:20]
Welcome, everyone.
[0:23]
First order of business is
approving the meeting agenda
[0:26]
with the following Amendment.
[0:28]
The removal of the item under
report of County administrator
[0:31]
regarding data, practices,
compliance officials.
[0:36]
Would someone like
to make that motion.
[0:41]
That motion, Mr. Chair.
[0:42]
Motion made by
Commissioner casa.
[0:43]
Is there a second.
[0:44]
I'll second.
[0:45]
Second by Commissioner Severson.
[0:47]
Any discussion.
[0:50]
Hearing none.
[0:51]
All those in favor,
signify by saying Aye.
[0:54]
Aye Opposed.
[0:55]
Same sign.
[0:56]
The meeting agenda has passed.
[0:59]
Looking for a resolution to
approve the consent agenda
[1:02]
with the following approval
of minutes from the July
[1:05]
21, 2026 board meeting.
[1:08]
Approval of regular full time
status, employees and acceptance
[1:11]
of resignations and retirements.
[1:14]
Approval of drainage, ditch
repairs and approval of claims.
[1:19]
Looking for a resolution.
[1:21]
I'll enter that resolution.
[1:22]
Entered by
Commissioner Severson.
[1:24]
Is there a second.
[1:25]
I'll second.
[1:26]
Second by Commissioner Eckstrom.
[1:27]
Any discussion.
[1:29]
Hearing none.
[1:30]
Will the clerk
please call the roll.
[1:32]
Commissioner?
[1:33]
yes.
[1:34]
Yes, yes Mr. Shaw.
[1:36]
Yes That is passed.
[1:40]
Moving on.
[1:40]
Report of board committees,
Commissioner Severson.
[1:43]
Yes I had the shared
Resources Committee
[1:45]
with the city of Albert
Lea, joint County
[1:48]
ditch 8 with city of Waseca.
[1:50]
Waseca County and rural
Minnesota Energy Board meeting.
[1:55]
Thank you, Commissioner casa.
[1:57]
Sir yes.
[1:58]
I attended the poweron
meeting with Martin,
[2:02]
Faribault and freeborn County.
[2:04]
They had an attorney there.
[2:05]
She was very interesting.
[2:08]
I don't think a lot came out of
it other than just information,
[2:13]
but it was interesting.
[2:16]
And then we've had two rounds
of AFSCME negotiations.
[2:20]
I think they're going well.
[2:23]
Now we're just working
on the language in it.
[2:27]
We've assessed the stuff from
the state was sick and safe
[2:32]
or whatever it is that
we have to include.
[2:35]
So far it's going OK.
[2:37]
And I attended the planning
and zoning meeting last night,
[2:40]
and I very much
appreciate commissioner
[2:43]
Ekstrom's preparation and
study that she does for that.
[2:46]
She comes very well
prepared with facts.
[2:49]
Thank you.
[2:50]
All right, Commissioner Schaaf.
[2:52]
None at this time,
Commissioner Ekstrom.
[2:56]
I also was part
of the ditch eight
[2:58]
meeting with Waseca County.
[2:59]
I had a River Watershed meeting
and there is some money from.
[3:06]
So it goes in two
year increments.
[3:08]
And freeborn lake is one
of the lakes in that area
[3:11]
considered an impaired lake.
[3:13]
So I would encourage
the city of freeborn
[3:16]
maybe to be looking into
ways of improving that area.
[3:23]
Planning commission meeting
last night, of course,
[3:25]
and I'll comment on that I
guess after under item number 5,
[3:30]
had a freeborn County Trail
Association meeting and a law
[3:35]
library meeting that only meets
about one to two times a year.
[3:39]
But we will be adding another
meeting because they're trying
[3:41]
to decide if the law library,
instead of using the judge's law
[3:47]
clerks that deal with the
materials in the law library,
[3:49]
if that will fall under the
County attorney's office.
[3:52]
So there's going to be
another meeting scheduled
[3:54]
here pretty soon for that.
[3:56]
And then a number of concerned
calls about the situation
[4:01]
in Twin Lakes.
[4:03]
And so yeah.
[4:06]
So that's enough for that.
[4:07]
All right.
[4:08]
Thank you.
[4:10]
I've sat through two rounds
of union negotiations.
[4:14]
The negotiations
are just starting
[4:16]
and they'll be going
through the end of the year.
[4:19]
We have seven unions that we
have to work through contract
[4:23]
negotiations with.
[4:24]
I2 was part of the
shared Resource Committee
[4:27]
with the city of Albert Lea,
and also sat on the joint ditch
[4:33]
eight hearing with
Waseca County,
[4:37]
went sat through interviews for
probation department director,
[4:43]
had a meeting with Albert
Lea, HRA their housing
[4:47]
and redevelopment.
[4:49]
Also went over to
Faribault County.
[4:52]
Visited with Faribault
County, Martin
[4:54]
County, and freeborn County
on the transmission lines.
[4:57]
That has a potential of
going through our County.
[5:00]
Met with the administration
on two different occasions
[5:04]
and also sat through.
[5:06]
We have a gentleman from
the AAMC that came down
[5:08]
to talk to each one of us board
members, and at some point
[5:13]
we'll all be gathering together
on how we can work together
[5:17]
as a whole board to better.
[5:20]
Freeborn County, and that's
what I've been up to.
[5:24]
So with that said, we'll move
on to miscellaneous business.
[5:30]
And first on that agenda is
the planning commission report,
[5:33]
if there's anything there.
[5:35]
Sure So we had a planning
commission meeting last evening
[5:39]
and we continue to work
on our energy storage,
[5:43]
the energy storage ordinance.
[5:46]
It's been a long road
and working on that.
[5:50]
But we want to get it as
nice as possible, or as clear
[5:53]
cut language as we possibly can.
[5:56]
Thank you for putting the
table of contents up there.
[5:58]
Ulan brothers
wanting a gravel pit.
[6:01]
And so that got tabled so
we could get a little bit
[6:04]
more information on
that, dealing with road
[6:06]
usage and a safer route.
[6:10]
The possibility
of a safer route.
[6:12]
The steel application was
approved and that's about it.
[6:18]
So all right.
[6:20]
Thank you.
[6:21]
Any other items under
miscellaneous business
[6:25]
then we'll move on.
[6:26]
Are there any persons
present wishing
[6:28]
to address the board
concerning matters pertaining
[6:30]
to this agenda, as well as any
other matters of County concern.
[6:35]
If so, please step forward.
[6:39]
Seeing none, we'll move on.
[6:41]
Report of various departments
beginning with the report
[6:43]
of Environmental Services.
[6:51]
Good morning, Mr. Chair.
[6:53]
Good morning, commissioners.
[6:54]
The first item I have
for you this morning
[6:56]
is to set a public
hearing date to extend
[6:58]
our interim zoning ordinance
pertaining to data centers.
[7:02]
The planning commission is
just turning the corner.
[7:04]
As commissioner
Ekstrom just said,
[7:05]
we're just turning the corner
on our energy storage ordinance.
[7:08]
Once that's buttoned up, we'll
move right into data centers,
[7:11]
extending this zoning, this
interim zoning ordinance
[7:14]
gives the County an
additional year to do that.
[7:18]
And I would recommend
that we hold
[7:20]
that hearing at the next
board meeting, the August 18.
[7:23]
I would allow me to get the
notice in the paper today
[7:26]
for a publication on Saturday,
and that would provide us
[7:28]
the correct timeline to be able
to hold that hearing and adopt
[7:31]
that language on the 18th.
[7:35]
Would someone like
to enter a motion
[7:37]
setting that public hearing
for the 18th of August, 2026?
[7:43]
I'll make the motion.
[7:44]
Motion made by
Commissioner Ekstrom.
[7:46]
Is there a second.
[7:47]
I'll second.
[7:48]
Second made by
Commissioner Severson.
[7:50]
Any discussion.
[7:53]
Hearing none.
[7:54]
All those in favor, signify
by saying, I opposed.
[7:58]
Same sign.
[7:59]
That motion has passed.
[8:01]
That hearing date is
set for August 18, 2026,
[8:04]
right here in this room.
[8:06]
Thank you.
[8:06]
I appreciate that.
[8:08]
The second item I have
for you this morning
[8:10]
is kind of a two-fold request.
[8:12]
The first request
is a motion to pick
[8:14]
up the Amendment to chapter 42,
Section 4259 off of the table.
[8:19]
As this item was tabled
at the last board meeting,
[8:22]
someone like to make a motion
to bring that resolution back
[8:27]
to the floor.
[8:29]
I'll enter that
motion, Mr. Chair.
[8:31]
Motion made by
Commissioner casa.
[8:32]
Is there a second.
[8:33]
I'll second.
[8:34]
Second by Commissioner Ekstrom.
[8:36]
Any discussion.
[8:38]
Sure I have a question.
[8:40]
Just an existing survey.
[8:44]
Would they just have to get
that updated with their plans.
[8:48]
Yeah, I don't know.
[8:50]
We're kind of getting into
the business side of it.
[8:53]
But I'm sure.
[8:55]
An old survey, it has the
data at the surveyor's office
[8:58]
say it's Jones and Smith
that has the old survey.
[9:02]
I would imagine that would
alleviate some of their labor
[9:04]
on their end to get
that survey produced.
[9:06]
And then adding in
the setback that we'd
[9:09]
be looking for the
structure that's proposed.
[9:14]
So the motion on the
floor is to bring
[9:17]
this item back to the floor.
[9:20]
There's a first and a second.
[9:22]
Any other discussion.
[9:24]
Hearing none.
[9:25]
All those in favor,
signify by saying Aye.
[9:29]
Aye Opposed.
[9:30]
Same sign.
[9:31]
Now we'll move on to the
actual resolution itself.
[9:34]
And that was an Amendment to
a current zoning ordinance.
[9:41]
Is there someone that wishes to
enter that resolution Mr. Chair,
[9:45]
I'll enter the resolution.
[9:46]
And then if it gets
seconded, then I
[9:51]
can offer some explanation.
[9:52]
OK entered by
Commissioner Eckstrom.
[9:55]
Is there a second, Mr. Chair.
[9:57]
Yes wasn't that already entered
and seconded at the last meeting
[10:02]
before it was tabled?
[10:09]
I know.
[10:14]
I think I requested we table it
till commissioner Eckstrom was
[10:18]
back before there was a motion.
[10:21]
I think that was the
only motion, wasn't it.
[10:24]
I don't know.
[10:24]
Seems we're getting into
the weeds a little bit here.
[10:26]
We're just trying to
get this worked through.
[10:32]
So is there a second.
[10:34]
I'll second.
[10:35]
Second by Commissioner Severson.
[10:37]
Any discussion.
[10:38]
Yes so I maybe should let
commissioner Eckstrom go first.
[10:46]
But, Trevor.
[10:51]
We already have things in place.
[10:54]
Kind of.
[10:54]
Correct I was told
by a gentleman
[10:57]
from the Board of adjustments.
[10:59]
Kind of already
have something where
[11:01]
if somebody comes in and fills
out an application and you
[11:06]
and the neighbor comes in,
you'll go out, you'll check,
[11:08]
you'll pull the application if
they have violated something.
[11:12]
Correct yeah.
[11:13]
We kind of at this point in
time, we rely on a site plan.
[11:17]
So the application has to
come with the site plan.
[11:20]
The issue there
though, is there's not
[11:22]
really good language
describing what that site
[11:24]
plan is supposed to be.
[11:26]
I've pulled files from back in
the day that are construction
[11:30]
paper with things glued to
it, which as the language
[11:34]
sits now that satisfies
that requirement.
[11:38]
And if we do see an issue, we
can always leverage a survey
[11:41]
on a certain project, especially
if we have complaints coming in,
[11:45]
but we don't really have
the teeth to require
[11:48]
that if someone puts up a
fight on requiring a survey,
[11:51]
I don't know.
[11:52]
I don't know how that
plays out with us
[11:54]
requiring that for the permit.
[11:57]
Well, because Ross has had
how many permits that 9,000,
[12:04]
you said.
[12:05]
Yeah, 9,000 plus.
[12:07]
Yeah and this has happened
a handful of times.
[12:11]
Yeah so I'm concerned
with us punishing
[12:15]
the entire public
because a couple
[12:17]
neighbors can't get along.
[12:18]
The other thing that
would concern me
[12:21]
is they come in, they tell
you they don't need a survey
[12:24]
because they're 10 feet away,
and you go out with your wheel
[12:27]
and say, nope, you're five.
[12:29]
So you have to have a survey.
[12:32]
Then the survey comes back.
[12:34]
They've spent $2,000 on their
survey, and they were right.
[12:38]
They shouldn't have had
to do it all of a sudden.
[12:40]
Is that going to open us up for
somebody suing us because they
[12:45]
were forced to spend $2,000.
[12:47]
They didn't need to.
[12:48]
I just I'm a little concerned
with some of these things.
[12:52]
So yeah Mr. Chair,
Commissioner casa,
[12:55]
it's really tough in land use
to come up with a perfect rule.
[12:59]
And those are certainly
potentialities
[13:02]
and probably some
unintended consequences
[13:05]
with the survey situation.
[13:07]
I can't really speak to
how that would play out
[13:09]
with regards to liability
and requiring surveys
[13:13]
and then turning out, turning
around at the end of the project
[13:16]
and finding out they
really didn't need one.
[13:19]
Yeah, I don't know how
to speak to the liability
[13:21]
side of requiring a survey,
but I can tell you it's
[13:25]
hard to strike a perfect rule.
[13:28]
There's probably going to be
situations that we didn't see,
[13:32]
as we try to use this
language and move
[13:35]
forward if it's approved.
[13:37]
But I mean, so are
we doubling up here.
[13:40]
Like, do we already
have some things
[13:42]
in place that handle
something that
[13:45]
doesn't happen all that often.
[13:47]
Yeah in our office,
we're unique as a County
[13:51]
because we are code
delegated County.
[13:53]
So we have checks and balances.
[13:56]
First process is zoning with me.
[13:58]
They turn in their site plan
and I look at the structure
[14:01]
and where it's at.
[14:02]
I look at the use of the
land and then if that's OK,
[14:05]
it goes to Ross.
[14:06]
And Ross is actually
the boots on the ground,
[14:09]
doing building inspections.
[14:11]
Excuse me.
[14:12]
So if he sees something as
he's doing his plan review,
[14:16]
usually that's where we catch,
in discrepancies in a site plan
[14:20]
between us there has been, a
handful of situations where
[14:24]
workloads a lot or someone
turned in an application
[14:27]
in a goofy way, and
we might miss one.
[14:31]
But I would say we do have
a process right now to catch
[14:35]
encroachments at this
point, but the language
[14:40]
in the ordinance allowing
for that is pretty vague.
[14:44]
So if it really did
come to push and shove,
[14:46]
I don't know how that would
play out other than just issuing
[14:50]
an Nov and going through
the enforcement process,
[14:53]
which is long and cumbersome.
[14:56]
Any other discussion.
[14:59]
Sure, Mr. Chair.
[15:00]
So this came up after
several incidences just
[15:04]
with me being on the
planning commission.
[15:05]
Actually, even before I was
on the planning commission,
[15:07]
learning about
residents that end up
[15:09]
fighting their neighbors
over encroachment
[15:12]
onto their property line.
[15:13]
So it was just kind of
trying to thinking of a way
[15:16]
of how can we make an ordinance
better to prevent that.
[15:20]
I guess trying to make
government work better on behalf
[15:22]
of the peoples is the goal.
[15:25]
I agree, I don't want unintended
consequences, however.
[15:29]
So in environmental services,
the building inspector,
[15:32]
he is not a surveyor.
[15:33]
So in one incident we have
a landowner coming back
[15:39]
blaming environmental
services for an issue
[15:41]
and saying that their
fault and so forth.
[15:45]
This does take the
guesswork out of it.
[15:48]
People that know where
their property line is.
[15:50]
Definitely my understanding
after the workshop
[15:52]
is that for the board,
some concern was
[15:55]
added expense onto landowners.
[15:58]
I guess the way the planning
commission had discussed
[16:01]
it was if you can
afford to build a brand
[16:04]
new garage or a big shed,
because again, smaller
[16:07]
units are exempt from this.
[16:10]
If you can afford to do
that could probably afford
[16:13]
several hundred
dollars to make sure
[16:15]
you are building where you're
supposed to be building.
[16:19]
And then also, if you have
that survey giving a little bit
[16:23]
more teeth than in
the event that person
[16:26]
goes ahead and
builds where they're
[16:28]
not supposed to build as well.
[16:32]
I guess I don't see it
as punishing people.
[16:34]
I see it as knowing exactly
where your property line is
[16:39]
and in essence,
protecting yourself,
[16:41]
protecting your neighbor.
[16:44]
And so.
[16:47]
Trying to think of
other things on here.
[16:49]
Let me just look at my
notes here for a second.
[16:51]
But as far as if you already
have an existing survey,
[16:57]
if there's a way, we
could always send it back
[17:00]
to the planning commission
to tweak some of the wording
[17:03]
in the ordinance to say, if
you have an existing survey
[17:06]
within the last 20
years or something
[17:08]
like that maybe it just
needs to be updated
[17:12]
or maybe that is still good.
[17:15]
I'd have again, we'd have
to contact actual surveyors,
[17:19]
I guess, to find out
how that would work.
[17:23]
So yeah, I guess it just kind of
takes that guesswork out of it.
[17:28]
Takes the burden off
environmental services
[17:31]
and then possibly the
County attorney's office.
[17:34]
If things start getting
really contentious
[17:39]
between two property owners Mr.
Chair, any other discussion,
[17:45]
Mr. Chair.
[17:45]
Yes I guess I'm looking
at personal responsibility
[17:53]
of people.
[17:54]
And they should want a survey.
[17:56]
We shouldn't have to tell them.
[17:58]
They should get one.
[17:59]
Every property I've purchased.
[18:01]
The first phone call I make
is Jones, Holland Smith.
[18:04]
So that's just something
they should do if they don't.
[18:11]
And I mean, I feel like
we're babysitting them.
[18:14]
I'm not sure this is necessary.
[18:20]
I just think we have enough
in place to handle it.
[18:24]
And I don't think it
happens that often.
[18:28]
And I'm looking
at if you like you
[18:30]
said, if you want to take it
back and do more language to it.
[18:36]
Because if they had a
survey 10 years ago, well,
[18:39]
pins can end up being removed
or dirt shift ground, whatever
[18:44]
is excavating or whatever.
[18:49]
I just think it comes down
to they should have they
[18:53]
should want to do it right.
[18:55]
And I don't think we should
have to have another level.
[19:00]
But I like if this
is protecting you.
[19:03]
I don't know how your office
and you all feel about it.
[19:07]
If you're neutral, if you're.
[19:09]
Either way.
[19:10]
Yeah Mr. chair.
[19:11]
Commissioner casa, we have
concerns with the expense.
[19:16]
Just because it's a
whole new procedure.
[19:20]
But we're all willing to
implement this language.
[19:24]
And if it's passed, we'll go
forward with what we have to.
[19:28]
But I know there is
some concern with how
[19:31]
applicants will handle that.
[19:34]
And I'm wondering if
it's going to make
[19:35]
more work for you because
now you have to then less.
[19:41]
Yeah I mean, as far
as workload goes,
[19:44]
I don't think it
would change much
[19:46]
just because we're
going to require that
[19:47]
at the time of application.
[19:49]
So they should be coming into
our office with that done
[19:52]
and ready to go.
[19:53]
And we most likely wouldn't
accept the application
[19:56]
or start the timeline until
we have that survey in hand.
[20:01]
And in Nikki's comment or
Commissioner Ekstrom's comment
[20:05]
that if they can afford
a shed, they can't
[20:07]
afford not maybe necessarily.
[20:09]
The shed might be financed and
extras sometimes aren't included
[20:15]
in that financing packet.
[20:17]
So good point.
[20:19]
I'm just.
[20:23]
My concerns are this doesn't
come up very often where there's
[20:27]
an issue with a property line.
[20:29]
And I feel it's a civil matter.
[20:32]
It should be handled
by the property owners
[20:35]
and not us getting involved
in something like that.
[20:39]
I do feel that it's going to put
an additional financial pressure
[20:45]
on individuals in the County
when they do want to put up
[20:48]
a building or add to and
up to thousands of dollars
[20:54]
to get something like this done.
[20:57]
I agree with what
Commissioner casa said.
[21:00]
People finance this thing,
something that they want
[21:02]
to add value to
their property with,
[21:05]
and they might have
saved for years
[21:08]
to be able to put up this
structure that they'd like.
[21:12]
And what I'm hearing is
whether it be a front,
[21:15]
back or side property line, the
setback is a determined footage.
[21:19]
We'll use 8 foot.
[21:21]
What I'm hearing is we don't
really know where that 8 foot
[21:24]
setback is, but we do
know when we go out,
[21:27]
we're 5 foot is from
that 8 foot setback.
[21:30]
That doesn't make any
sense to me at all.
[21:32]
Yeah it's again to speak to
that previous statement I made.
[21:36]
It's really hard to
strike a perfect rule.
[21:39]
I think if anything,
this is a good backdrop.
[21:42]
If we do find a discrepancy,
we have the legal description
[21:46]
in the survey in hand.
[21:48]
But I understand our office.
[21:50]
We're not surveyors.
[21:52]
So it gets a little
tricky there.
[21:54]
And that's why I'm
kind of hesitant
[21:55]
sometimes when people
ask me to come stake
[21:58]
and we'll a structure.
[21:59]
I've been advised from the
AAMC and McPizza lawyers
[22:04]
that that's kind
of tricky business,
[22:07]
because if it does
go to court now,
[22:08]
you're the expert witness that
wheeled off that distance,
[22:11]
and you have to
prove you know where
[22:13]
you started that point from.
[22:15]
So again, right
there, I'm concerned
[22:17]
that putting this into place,
he said, this is a civil matter.
[22:22]
This is between neighbors.
[22:24]
They should figure it out.
[22:26]
My neighbor and
I figured it out.
[22:28]
They didn't realize
they'd built too close.
[22:31]
No big deal.
[22:32]
We are polite and
figured it out.
[22:36]
All of a sudden,
we have something.
[22:38]
Is that going to suck
us in to something.
[22:40]
That should be a civil matter.
[22:44]
I'm being the devil's
advocate here or trying.
[22:49]
Worst case scenario.
[22:51]
I don't know.
[22:53]
We're here.
[22:54]
Yes Nikki.
[22:57]
Could you Trevor, elaborate.
[22:58]
Do we know other counties.
[22:59]
Have they adopted something
similar here in Minnesota.
[23:03]
I don't know planning
Minnesota very well.
[23:05]
So what is a standard.
[23:07]
Yeah commissioner.
[23:08]
Board Chair, administrator.
[23:11]
I don't know the exact numbers.
[23:13]
I know it's not common
practice to require
[23:16]
surveys on the County level.
[23:17]
Many municipalities do.
[23:19]
But I think that's the
nature of the smaller lots.
[23:22]
Higher density housing I could
certainly do some research
[23:27]
and try to find those numbers.
[23:29]
This language was
just kind of built
[23:32]
from the ground up without
much input from counterparts.
[23:37]
Mostly because the counties
I think the philosophy is
[23:43]
that most of these situations
should be handled civilly
[23:46]
in the counties roll a lot of
times is to make them aware
[23:50]
and tell them this
needs to be resolved.
[23:53]
So yeah, I guess I don't
have that exact that exact
[23:56]
number of how many counties in
the state use surveys for site
[23:59]
plans.
[24:01]
I don't have that answer either.
[24:03]
So just I wasn't looking
for an exact number,
[24:06]
but if it is a general practice,
I was looking more for that.
[24:11]
Any other discussion.
[24:13]
I do understand the I
guess, the purpose of it.
[24:16]
I can see the scenario where
we expect people to act
[24:20]
in good faith and it could
maybe not happen in a scenario
[24:24]
where perhaps the neighbor
doesn't have enough money
[24:27]
to go get a survey to push
back against the construction
[24:31]
their neighbor is
doing or hire a lawyer.
[24:36]
That part of it where it
can really protect maybe
[24:38]
the neighbor who's
not building up.
[24:40]
I do have some of the same
concerns as Brad and Dawn.
[24:44]
And also kind of
construction timelines.
[24:47]
Like, I know sometimes it
can be difficult to get
[24:50]
a survey scheduled,
especially in the middle
[24:52]
of summer construction season.
[24:55]
So I do have pushback
there as well.
[25:01]
And yeah, some of
those same concerns.
[25:03]
You guys have any more
discussion Mr. Chair.
[25:07]
Yes so the planning commission
took this up in June
[25:10]
and it passed unanimously
at that point.
[25:13]
What was any discussion
or prior to that
[25:17]
or what were their views.
[25:19]
Yeah Mr. Chair.
[25:21]
Commissioner Schaaf.
[25:22]
We started out the language
a little aggressive, I think.
[25:26]
I think it was at 50 feet
from the property line.
[25:29]
We were discussing
requiring a survey.
[25:32]
Our office wasn't
a big fan of that
[25:34]
number just because it didn't.
[25:36]
It wasn't pertaining to
the actual setback line
[25:39]
that we're concerned about.
[25:40]
And sometimes you run into
narrower lots, older lots where
[25:43]
that no matter where
they go on the property,
[25:46]
they're going to require survey.
[25:48]
So then it was brought
back to be revised.
[25:51]
And that's where we
came up with the 5 foot
[25:52]
from the setback line.
[25:55]
A lot of the
discussion I mean, we
[25:58]
had similar discussion to
what we're having right here.
[26:02]
A lot talk about the
expense of the survey.
[26:05]
But I feel like the
planning commission,
[26:07]
they're very objective and
trying to meet and reach
[26:10]
a goal that we're discussing.
[26:11]
So in the end, it
was unanimously
[26:14]
voted to approve or
recommend approval, I think,
[26:16]
because we had kind of
achieved what we set out to do.
[26:23]
Yeah, there wasn't a
whole lot other than what
[26:26]
we've discussed here today.
[26:29]
But in the end, they did all
vote to recommend approval.
[26:34]
Any other discussion, Mr. Chair.
[26:37]
With that being said, should
it be something that goes back
[26:39]
to the planning commission
to talk further on or because
[26:43]
of the concerns raised today.
[26:46]
Yeah, that's certainly
an option on the table,
[26:48]
is to send it back with a list
of the concerns we've discussed
[26:52]
at the board level could maybe
even address how many counties
[26:56]
in the state utilize surveys.
[26:58]
And it may give me an option to
sit down with some legal counsel
[27:02]
and try to flush out some of
those unintended consequences.
[27:06]
We've been discussing.
[27:07]
Well, at this time, the
resolution on the floor
[27:09]
is to adopt this Amendment to
the current zoning ordinance.
[27:14]
So we would be voting on that.
[27:15]
And then if it's
approved, there would be
[27:18]
no reason for further action.
[27:20]
If it's not approved, then if
the planning and zoning board
[27:25]
wish to come up
with some other idea
[27:28]
that they have that
opportunity, I guess.
[27:32]
Agreed any other discussion.
[27:36]
Hearing none.
[27:36]
Will the clerk
please call the roll
[27:38]
Mr. Chair, just a
quick question then.
[27:40]
So if the resolution
fails, is it the wish
[27:43]
of the board for the
planning commission to rehab,
[27:49]
to look at some of
these key points
[27:52]
because the planning
commission will take direction
[27:54]
from the County Board.
[27:56]
So, I mean, the planning
commission could add things
[27:59]
on its own to the agenda, but
it would be curious to know what
[28:03]
the direction of the County
Board is if the County Board,
[28:07]
if my personal thoughts that
if this doesn't if this fails,
[28:11]
that it's done.
[28:13]
I don't know that we should
be traveling down this road
[28:15]
anyway, to be honest with you.
[28:17]
That's my thoughts.
[28:18]
I don't know if anybody
else wants to share theirs
[28:20]
or would be happy to have an
opinion from our attorney.
[28:29]
Are you talking about.
[28:30]
Yeah do you have an opinion
on this, Mr. Walker.
[28:33]
No no.
[28:34]
OK OK.
[28:36]
Anybody else wanted to share.
[28:39]
Anything else before
we call the roll.
[28:43]
All right.
[28:44]
Please call the
roll Mr. Stevenson.
[28:47]
No commissioner.
[28:48]
Commissioner? yes, Commissioner.
[28:51]
Yes, Commissioner.
[28:52]
Edwin no.
[28:53]
Resolution has failed.
[28:56]
Moving on.
[28:57]
Report of Human Services.
[29:11]
Good morning, Mr. Chair.
[29:12]
Good morning, commissioners
administrator,
[29:14]
I have one item for your
consideration this morning.
[29:17]
The mental health
center is required
[29:20]
to maintain some
maintain client files
[29:22]
in accordance with
Minnesota statute 245 0.09.
[29:27]
The electronic health record
that we use is called Care logic
[29:30]
and qualify as the vendor of
that electronic health record.
[29:35]
If that contract
were to auto renew,
[29:37]
we would have seen a 6%
increase for the coming year.
[29:41]
So we were able to
negotiate a new contract,
[29:45]
which resulted in a 4%
increase rather than the six.
[29:49]
That's the easy part.
[29:50]
The more complicated
piece of this
[29:52]
is the telehealth
platform that's been used
[29:56]
has previously been
provided and paid
[29:58]
for by the CBI, which is our 10
County Mental Health Initiative.
[30:03]
And that was started
during COVID.
[30:06]
Because all of a sudden
everybody had to do telehealth.
[30:10]
So since then, laws have
changed on the federal level
[30:13]
and the state level that allow
more accessible telehealth,
[30:16]
which is a pretty regular
practice across the board,
[30:18]
across the country, actually.
[30:20]
Also, since then, the other
counties in our initiative
[30:26]
have gone to other options like
adopting teams, another platform
[30:33]
such as CoreLogic.
[30:35]
So our mental health
center is the only entity
[30:39]
still utilizing
those Zoom licenses
[30:41]
paid for by the initiative.
[30:44]
Now, the type of Zoom
license that's required
[30:47]
is an enterprise license
because of its integration
[30:50]
with the electronic health
record, it's HIPAA compliance.
[30:53]
All of the rules that have
to be done with telehealth,
[30:57]
and the minimum license
purchase for that level of Zoom
[31:02]
is 100 licenses.
[31:04]
It doesn't make sense for
the initiative or for us,
[31:06]
frankly, to purchase
100 licenses
[31:09]
to do telehealth
when we need a very
[31:11]
small number of those licenses.
[31:13]
So the contract with
qualify for CoreLogic
[31:18]
includes a telehealth
platform that's integrated
[31:20]
into each client's file.
[31:24]
And it also integrates a.
[31:27]
If you'll recall,
a few months ago,
[31:30]
I brought a contract for the
text reminders and things
[31:35]
like that for clients.
[31:36]
You have an appointment,
come in and you
[31:39]
get when you go to the doctor,
you get those reminders.
[31:42]
So this platform
also integrates that.
[31:45]
So this contract would bring
in the telehealth platform,
[31:50]
that other platform and our
current electronic health
[31:53]
record.
[31:56]
All of those things
would be streamlined.
[31:58]
The billing invoicing
documentation
[32:02]
would all be done much more
efficiently, much more quickly
[32:05]
and with more accuracy.
[32:07]
By going this direction, if
we were needing to purchase
[32:10]
those other pieces separately.
[32:13]
We would see over $25,000
increase in the amount that we
[32:17]
would be required to
maintain their services
[32:20]
as we're providing them now.
[32:22]
And this option
is seeing a $6,300
[32:26]
increase rather than 25,000.
[32:29]
So that is the contract that is
presented in the Board packet
[32:34]
today.
[32:36]
So that would be my request
is for to consider resolution
[32:40]
approving this
current this contract
[32:42]
with qualify for the
electronic health record
[32:45]
with the added telehealth
platform in the client
[32:49]
portal, which includes
the integration of all
[32:51]
of those services that
we're already providing.
[32:55]
So I would like to
enter that resolution.
[32:57]
I'll enter that
resolution, Mr. Chair.
[32:59]
Entered by Commissioner casa.
[33:00]
Is there a second.
[33:01]
I'll second.
[33:02]
Second by Commissioner schoff.
[33:04]
Any discussion Mr. Chair, just
thank you for that explanation,
[33:08]
because that was a lot more
information than what I could
[33:10]
just get off the paperwork.
[33:12]
So thank you.
[33:13]
Any other discussion.
[33:15]
Board Chair.
[33:15]
Yes Did you run that
through with it.
[33:18]
Is it maybe state system pulling
data separate from our data.
[33:23]
Or is there any integration
that we need to worry about.
[33:26]
There's no integration
with any state system.
[33:29]
It's the software
we're already using
[33:32]
and have been for 16 years.
[33:34]
So thank you Susie.
[33:37]
Any other comments,
concerns questions.
[33:42]
Hearing none.
[33:42]
Will the clerk call the roll.
[33:45]
Yes, Commissioner.
[33:46]
Yes Mr. Yes Mr.
Yes Mr. Edwin yes.
[33:50]
It is passed.
[33:51]
Thank you.
[33:52]
Thank you.
[33:54]
Report of Public Works.
[34:02]
Good morning, Mr. Chair.
[34:03]
Good morning commissioners.
[34:04]
I have one item for your
consideration this morning.
[34:07]
It is a resolution approving
MnDOT detour maintenance
[34:10]
agreement number 1063524.
[34:14]
This item involves a detour
off of US Highway 218,
[34:18]
in mower County
for culvert repairs
[34:20]
by the state puke The drive
in will use freeborn County
[34:23]
state-aid highway 36 on the
mower County freeborn County
[34:27]
line, and freeborn
County will be
[34:30]
compensated for the
road life consumed
[34:32]
as a result of this traffic.
[34:34]
We've used this agreement
numerous times in the past
[34:36]
and I request your approval.
[34:39]
Someone would like to
enter that resolution.
[34:42]
I'll enter that entered
by Commissioner Severson.
[34:44]
Is there a second.
[34:46]
I'll second.
[34:47]
Second by Commissioner Eckstrom.
[34:48]
Any discussion.
[34:50]
Just a quick question.
[34:51]
What are the dates
of the detour.
[34:52]
Do you know.
[34:54]
That is a fantastic question.
[34:57]
I don't think it's for
this construction season.
[34:59]
I think it's for next
construction season.
[35:02]
I will follow up on that and
share that information with you.
[35:05]
Sure thank you.
[35:05]
Yep any other discussion.
[35:09]
Hearing none.
[35:10]
Will the clerk please call
the roll Mr. Stevenson.
[35:12]
Yes Mr. Yes Mr.
Yes commissioner.
[35:16]
Yes Mr. Yes that is passed.
[35:18]
Thank you all.
[35:20]
Report of the Sheriff's Office.
[35:29]
Good morning.
[35:30]
Commissioners there are two
resolutions in front of you.
[35:33]
The first one is to fill a
vacant patrol deputy position.
[35:37]
About two weeks ago, we
had one of our deputies
[35:40]
that was in training
decided to step down.
[35:42]
And he's taken a different
position with the County.
[35:44]
So we need to backfill
his position now.
[35:48]
So we'd like to do that.
[35:50]
Someone would like to
enter that resolution.
[35:53]
I'll enter that
resolution Mr. Chair,
[35:54]
entered by Commissioner casa.
[35:56]
Is there a second.
[35:58]
I'll second.
[35:59]
Second by Commissioner Shaw.
[36:00]
Any discussion.
[36:04]
Will the clerk
please call the roll.
[36:06]
Yes Yes commissioner Shaw.
[36:10]
Yes Mr. Edwin.
[36:11]
Yes that is passed.
[36:13]
Thank you.
[36:14]
The second resolution
is for the sale
[36:16]
of one of our old squad cars.
[36:18]
It's a Durango with a little
over 100,000 miles on it.
[36:22]
So it's served its
purpose with us.
[36:24]
And it's time to sell it.
[36:25]
And it gets sold on
the auction site.
[36:28]
So someone like to
enter that resolution.
[36:32]
I'll enter this entered
by Commissioner Severson.
[36:34]
Is there a second.
[36:37]
I'll second.
[36:38]
Second by Commissioner Eckstrom.
[36:39]
Any discussion.
[36:43]
Is it the norm to sell
a vehicle that's used
[36:45]
for patrol at 100,000 or.
[36:48]
Yeah so we sell them
more on time frame
[36:52]
than we do on mileage.
[36:54]
So typically, we are replacing
five or six vehicles a year.
[36:59]
We have 28, give or
take, depending upon what
[37:03]
time of the year it is.
[37:05]
And so that's kind of our
so some of the vehicles
[37:08]
are replaced at about six years.
[37:10]
Most of the patrol vehicles are
replaced at about four years.
[37:14]
And they're putting
roughly 20,000
[37:15]
to 25,000 miles a year on.
[37:17]
So it's somewhere
between 75 and 105
[37:22]
is where they're
getting replaced.
[37:24]
In the past we've tried
to do five years before.
[37:29]
And once you get over
that 100,000 mile mark,
[37:31]
the vehicles really start
to nickel and dime you.
[37:34]
And it's better just
to be rid of them.
[37:37]
Any other discussion.
[37:40]
Hearing none.
[37:41]
Will the clerk
please call the roll.
[37:43]
Yes Yes, Commissioner.
[37:47]
Yes, Commissioner.
[37:47]
Edwin? yes, that is passed.
[37:49]
Thank you.
[37:50]
And don't forget,
today starts the first
[37:53]
of the six best days of summer.
[37:58]
All right, moving on then.
[38:01]
Any other items
necessary at this time.
[38:06]
We'll move on.
[38:07]
County Commissioner items.
[38:08]
Commissioner Severson.
[38:10]
Nothing from me.
[38:11]
Thank you, Commissioner casa.
[38:13]
Just same as Sheriff Shay.
[38:15]
Reminder, six best days
of summer are here.
[38:18]
All right.
[38:19]
Thank you, Commissioner shauf.
[38:21]
Nothing at this time.
[38:22]
Thank you, Commissioner Ekstrom.
[38:24]
Just a couple of things.
[38:26]
If anybody from
our smaller cities
[38:28]
is listening, which I
always hope they are.
[38:31]
There are DNR grants available
dealing with emerald ash borer.
[38:36]
So some of these
small communities
[38:37]
can be replacing their trees.
[38:40]
But the money also helps
get rid of the trees,
[38:42]
which is very costly.
[38:43]
And then also the Southern
Minnesota Initiative Foundation,
[38:48]
they have two grant
cycles that are
[38:49]
open right now for communities
that are under 10,000 people.
[38:53]
And I know a number of
our small communities now,
[38:56]
I feel like more
than in the past
[38:58]
are taking advantage
of those small grants.
[39:01]
And it's a great thing for
these small communities.
[39:05]
And then thank you for
discussing priorities for AMC.
[39:10]
And I'm curious to know right
now if anybody is signed up
[39:14]
to go to AMC, the policy
conference in September,
[39:18]
not to put anybody
on the spot, but just
[39:20]
for us to be thinking how we
will divide up those messages
[39:24]
based on our committees at AMC.
[39:27]
So if not all five
of us are going,
[39:29]
and there are key
things that fall under,
[39:33]
for example, law enforcement
or public works or environment
[39:36]
and natural resources.
[39:37]
We want to make sure we
get those messages to AMC.
[39:41]
So, so I said, I didn't mean
to put anybody on the spot,
[39:44]
but I just want to
be thinking about,
[39:46]
it's great that our
department heads
[39:48]
have put in the
work of determining
[39:50]
what some of our priorities
are at the County level.
[39:53]
We just want to make sure that
message is getting to AMC.
[39:57]
So it's in Bemidji this year.
[40:00]
Correct it is.
[40:01]
At some point,
sooner versus later,
[40:04]
we probably should
have an affirmation
[40:05]
of who all plans to attend.
[40:07]
So just so that's on our radar
because it's coming up quickly.
[40:11]
And then the.
[40:15]
Two things.
[40:16]
One, I had a
freeborn County Trail
[40:18]
Association meeting last night.
[40:20]
So this is in support
of all trails.
[40:22]
And the topic comes
up over and over again
[40:25]
with the blazing star trail.
[40:27]
The fact that they have
that approximately one
[40:29]
mile that still is
not hard surfaced yet.
[40:33]
And we had the discussion, if
perhaps the County, the city
[40:38]
of Albert Lea, the
city of Hayward
[40:40]
would maybe want to do a
joint letter in support,
[40:44]
get it up to the DNR.
[40:46]
The funds are there.
[40:48]
The issue that is
dragging this out
[40:51]
is they want to repair
a bigger segment
[40:55]
of the trail, all in one shot.
[40:58]
Now they have found that a big
portion of the trail with, I'm
[41:01]
sorry, a portion of the trail
we're dealing with a big Hill
[41:04]
is not ADA compliant.
[41:05]
Now, the latest
is they can't make
[41:08]
it ADA compliant
because that trail
[41:10]
isn't possible to be rerouted.
[41:13]
So it's just this crazy
situation of a trail that
[41:17]
never seems to be complete.
[41:18]
When you have a
city of Hayward that
[41:19]
can greatly benefit from it.
[41:21]
Freeborn County as a
whole city of Albert Lea
[41:24]
can benefit from getting this
last little small segment
[41:28]
asphalted.
[41:29]
And so it just came up
last night at the meeting,
[41:33]
if that is something.
[41:34]
So if it could be a five minute
discussion at the workshop
[41:38]
if we want to communicate
with the city of Albert Lea,
[41:41]
the city of Hayward, and just
draft a letter, especially
[41:44]
with us getting up
when I go to AMC,
[41:48]
I get updates from just
dealing with my committees.
[41:51]
I get updates from the DNR,
although I was told the people
[41:55]
that show up for
my updates at AMC
[41:58]
are not the right people
to be communicating with.
[42:01]
And so I do have some
contacts at the DNR
[42:04]
that I think would be
receptive or who we would
[42:07]
be sending that letter to.
[42:10]
And then the last
thing on my list
[42:13]
is I had the privilege of
volunteering out at the four H
[42:16]
building yesterday, and
it is amazing to see
[42:20]
such a robust four-h
program in freeborn County.
[42:24]
They one of the
trivia questions.
[42:26]
They have approximately 400.
[42:27]
Well, actually almost 500 kids,
496 kids in freeborn County
[42:31]
signed up through four-h.
[42:32]
And so I worked in
the four-h building
[42:35]
as kids were bringing
in their projects,
[42:39]
and then they were
getting their fair passes.
[42:41]
And then Amy wadding,
one of the things
[42:43]
that she implemented this year
was to have the kids fill out
[42:46]
a sheet of paper saying,
in essence, like a life
[42:49]
skill that they've
learned through four-h
[42:51]
that they can bring
into adulthood.
[42:53]
And it was phenomenal
to see these kids.
[42:57]
So many kids didn't even
have to think twice.
[42:59]
They were able to write down
everything from speaking
[43:02]
and communicating with adults,
being able to keep appropriate
[43:06]
records, leadership
skills, working with youth,
[43:09]
and just the fact
that freeborn County
[43:12]
and this board of Commissioners,
we support the 4H program.
[43:16]
I know fees have
increased over the years
[43:18]
through the extension service,
but we do have a robust program
[43:23]
and these are future leaders.
[43:25]
And it was really neat to
be part of that yesterday.
[43:27]
So I just wanted to share
that with you as a board.
[43:30]
All right.
[43:31]
Thank you.
[43:31]
I have two quick items.
[43:33]
The first being our
next public meeting
[43:36]
will be a workshop in
the freeborn freeborn
[43:39]
room on August 11, 2026.
[43:43]
And our next board meeting
right here in this room
[43:45]
will be August 18.
[43:48]
And that's all I have.
[43:50]
And with that, we are adjourned.
[43:52]
Thank you.