Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
Copy of a YouTube video held by the Internet Archive.
Captions were copied from the YouTube video.
This transcript looks garbled at the source (not a parsing bug on our end) -- treat it as approximate.
Captions were copied from the YouTube video.
This transcript looks garbled at the source (not a parsing bug on our end) -- treat it as approximate.
[0:00]
Welcome to the Wednesday, March 18, 2026
[0:03]
meeting of the Gloucester Conservation
[0:05]
Commission. The time is 5:30. I will
[0:08]
start with a roll call. Commissioners
[0:10]
present. Cook
[0:11]
>> here.
[0:12]
>> Argent
[0:13]
>> here.
[0:14]
>> Member Elites
[0:15]
>> here.
[0:15]
>> Member Terry and member Jackson
[0:18]
>> here.
[0:20]
>> Present.
[0:22]
>> Okay, we'll start off the meeting with
[0:24]
an administrative briefing. Chuck, do
[0:26]
you have anything to catch us up on?
[0:29]
Uh not a whole lot. Uh we do have uh
[0:32]
progress being made on the uh culvert
[0:35]
down at Lennic Avenue, Atlantic Street,
[0:38]
uh right there at the uh pillars. Um
[0:42]
they are running just slightly behind
[0:45]
schedule because of all the weather. Um
[0:47]
but they are moving right along and they
[0:50]
should have flow established if not by
[0:52]
the end of this week, uh the beginning
[0:54]
of next week. Um they've basically kind
[0:57]
of finished up all of the structure and
[0:59]
they're just kind of redoing the uh the
[1:01]
uh substrate around the structure and
[1:04]
then they will get the uh bottom
[1:06]
substrate of the culvert installed uh
[1:09]
probably starting sometime tomorrow.
[1:12]
>> Okay, sounds good.
[1:14]
If you have nothing else, we'll move on
[1:16]
to public comment. This is the
[1:18]
opportunity for anyone in the audience
[1:19]
who wishes to comment on an item of
[1:22]
conservation value that is not on the
[1:25]
current agenda. um the opportunity to do
[1:28]
so. Is there anyone who wishes to speak?
[1:36]
» Don't have any hands up on the Zoom and
[1:39]
I'm here in person.
[1:41]
>> Okay, I'll close the public comment
[1:42]
period. We'll move on to minutes review
[1:44]
and approval. Um we're working on the
[1:47]
minutes for March 4th, 2026.
[1:53]
Commissioner Cook moves to approve the
[1:56]
minutes for March 4th, 2026.
[2:00]
>> Commissioner Sergeant seconds.
[2:02]
>> Call. Member Cook.
[2:03]
>> Yes.
[2:04]
>> Sergeant.
[2:05]
>> Yes.
[2:05]
>> Member Lightes.
[2:06]
>> Yes.
[2:07]
>> Member Jackson.
[2:08]
>> Yes. Okay. Moving on to continued
[2:11]
business. First up is NOI 028 2976
[2:16]
171 and 281 rear Magnolia Avenue. how
[2:20]
Mag LLC being the owner and this is was
[2:23]
previously continued to April 15th,
[2:26]
2026.
[2:28]
Next up is NOI028
[2:31]
um unassigned
[2:34]
NO um D number for 18 rear bungalow road
[2:39]
uh Marshia Sassoon owning and this also
[2:42]
was previously continued to April 1st
[2:45]
2026.
[2:47]
Then we have NOI two together. NOI
[2:50]
028-30006
[2:52]
at 105 Wingers Road, 125 Wingers LLC and
[2:57]
NOI 02830007
[3:00]
107 Wingershik Road also by 125 Wingers
[3:05]
LLC. There has been a request to
[3:07]
continue each of these items to a the
[3:10]
meeting of April 15, 2026.
[3:13]
Commissioner Cook makes a motion to move
[3:16]
NOI 02830006
[3:19]
and NOI 02830007
[3:23]
to the meeting of April 15, 2026.
[3:29]
» Mr. Sergeant seconds member Cook.
[3:32]
>> Yes.
[3:33]
>> Sergeant,
[3:34]
>> yes. Memberes,
[3:35]
>> yes.
[3:35]
>> And Jackson,
[3:37]
>> yes.
[3:39]
NOI 0283036
[3:41]
at 36 and 7 Welch Lane and Rear Woodman
[3:44]
Street by RDL Welch Lane LLC. There's
[3:48]
also been a request to continue to the
[3:50]
meeting of April 15, 2026.
[3:53]
>> Commissioner Cook makes a motion to move
[3:56]
NOI 0283036
[3:59]
to the commission meeting of April 15,
[4:02]
2026.
[4:05]
>> Commissioner Le call member Cook. Yes.
[4:09]
>> Sergeant
[4:10]
>> stay.
[4:12]
Yes. Member Jackson.
[4:14]
>> Yes.
[4:15]
Okay. NOI 0283077
[4:19]
at 37y Road by Daniel Fonzi. There has
[4:23]
been a request to withdraw this
[4:24]
application without prejudice.
[4:27]
>> Aiden does have his hand up if we want
[4:29]
to hear from him.
[4:31]
>> Okay.
[4:33]
>> He should be joining now.
[4:37]
name and address for the record, please.
[4:39]
>> Sorry, I lost you there for a second.
[4:41]
Um, rejoin as panelists. Uh, Aiden
[4:43]
Church, Casside Legal Solutions, address
[4:45]
123 Main Street, Glouester. Um, so as
[4:49]
you mentioned, um, Mr. Chair, we did
[4:53]
just submit this afternoon a written
[4:55]
request for um, a request to withdraw
[4:58]
this NOI. I'm going to also address the
[5:02]
request for certificate of compliance
[5:03]
that's um later on down the agenda for
[5:06]
35 mass road. So, uh, based on the
[5:10]
discussion that we had, uh, two weeks
[5:12]
ago here with the commission, based on,
[5:15]
um, you know, the additional impact area
[5:18]
on 35 Massesoy Road, we're going to
[5:21]
respectfully request, uh, that the
[5:23]
commission issue a friendly enforcement
[5:25]
order uh, pertaining to 35 Massoy Road.
[5:28]
Uh, we hope to work collaborative
[5:30]
collaboratively with the commission to
[5:32]
address um, that additional impact area
[5:35]
through a restoration plan. Um, so
[5:39]
obviously it's at the at the
[5:41]
commission's discretion as to as to when
[5:44]
to issue that enforcement order, but we
[5:46]
would request that it is placed on once
[5:49]
it is issued that it is placed on on the
[5:51]
May 6th agenda so that we have
[5:54]
sufficient time to develop that
[5:56]
restoration plan and um and submit it in
[5:59]
advance of that hearing. So, uh, just to
[6:02]
recap, the the request in its entirety
[6:04]
is to withdraw the NOI for 37 Masses Soy
[6:10]
Road again without prejudice. Um, so
[6:12]
that we can hopefully come back in the
[6:13]
future. Um, and then to also withdraw
[6:16]
the request for certificate of
[6:17]
compliance on 35 Massesoid um, also
[6:21]
without prejudice and then that the
[6:24]
commission issue a friendly enforcement
[6:25]
order pertaining to uh, 35 Massoy Road.
[6:29]
I'm happy to answer any questions uh
[6:31]
about any of the process or anything
[6:32]
like that.
[6:34]
>> Okay.
[6:35]
>> Madam Chair, I just want to state for the uh RCOC um
[6:43]
there's not really a withdrawal process
[6:44]
for that. So, I think the commission
[6:46]
should probably vote that uh they're not
[6:48]
going to issue the COC at this time and
[6:50]
I'll write a written letter and that'll
[6:52]
kind of close it out um on the current
[6:54]
agendas and then they can resubmit for
[6:56]
that once they've kind of cleaned things
[6:58]
up with the enforcement order. But I
[7:00]
think it should be voted on rather than
[7:03]
>> Okay. So, let's let's do this in this
[7:05]
order. Why don't we withdraw the 37
[7:08]
Massoyat and then take up the COC
[7:12]
request and
[7:15]
decide we can vote on that not to issue
[7:18]
a COC?
[7:19]
>> Yes.
[7:20]
And and then we vote again to ask
[7:24]
you to issue an enforcement order.
[7:25]
>> Yes.
[7:26]
>> Okay. Sounds good. All right. So, I will
[7:28]
entertain a motion to withdraw.
[7:31]
Where are we? NOI 0283077
[7:34]
at 37 Massasoya Road without prejudice.
[7:37]
>> Commissioner Cook makes a motion to
[7:39]
withdraw without prejudice. NOI 0283077
[7:46]
seconds. Roll call. Member Cook.
[7:48]
>> Yes.
[7:50]
>> Member Elitees.
[7:51]
>> Yes.
[7:51]
>> Member Jackson.
[7:53]
>> Yes. Okay. Next up, we will I got to
[7:57]
find it.
[7:59]
Okay. We will
[8:03]
discuss whether or not to withdraw or we
[8:06]
will withdraw
[8:10]
without prejudice the request for a
[8:13]
certificate of compliance 0282721 at 35
[8:16]
Massy Road unless anybody in the
[8:18]
commission objects to that. Does
[8:20]
anybody?
[8:21]
>> Again, just to be clear, it's it's not a
[8:23]
withdrawal. It just be a uh a vote to
[8:25]
not issue the COC.
[8:27]
>> Not issue. I'm sorry. You're right. Vote
[8:29]
to not issue. Okay. Is there anybody who
[8:32]
has an discussion with that
[8:38]
» on the commission? Okay. Then Chuck, do
[8:40]
you want to take a poll for agreement?
[8:43]
>> Uh, sure. Um,
[8:45]
>> Cook.
[8:47]
>> Yes.
[8:48]
>> Sergeant,
[8:48]
>> yes.
[8:48]
>> Member Elites.
[8:50]
>> Yes.
[8:50]
>> Member Jackson.
[8:51]
>> Yes. And finally,
[8:55]
yes. Um, not issue. Okay. Finally, we
[8:59]
will take up the issuance of a friendly
[9:02]
enforcement order in order to get them
[9:04]
into compliance.
[9:06]
Um,
[9:08]
would someone like to make a motion to
[9:10]
so issue?
[9:12]
>> Commissioner Cook makes a motion
[9:14]
uh to request uh the agent do a friendly
[9:18]
enforcement order
[9:21]
uh for 35 Massoy Road. Commissioners and
[9:25]
seconds. Welcome. Member Cook. Yes.
[9:28]
>> Sergeant.
[9:28]
>> Yes.
[9:30]
>> And member Jackson.
[9:31]
>> Yes.
[9:34]
>> Okay.
[9:35]
>> Thank you. Um we'll we'll collaborate
[9:37]
with Chuck on just uh when that is is
[9:40]
issued and stuff like that, but we would
[9:41]
just request some time to um come back
[9:43]
with with a plan. So, uh just the the
[9:46]
May 6th agenda would work for us. Um so,
[9:49]
just just reiterating re reiterating
[9:51]
that and um and thank you again.
[9:54]
>> Thank you. and we trust your contact
[9:56]
with Chuck and we'll take it from there.
[9:59]
>> Perfect.
[9:59]
>> Thank you.
[10:00]
>> Okay.
[10:03]
Next up, we have NOI 0283110
[10:06]
at 232 Atlantic Street, Wingers Beach by
[10:09]
the city of Gloucester, DPW, Fedune and
[10:12]
uh trail restoration in coastal dune,
[10:15]
coastal beach, barrier beach, land
[10:17]
subject to coastal storm flowage and
[10:19]
priority and estimated habitats of rare
[10:21]
species represented by Kansas Richie
[10:24]
Mun, operations manager of beaches and
[10:27]
parks.
[10:28]
>> Thank you.
[10:32]
So, oh yeah. Um, so
[10:35]
>> thank you for uh your our last session
[10:39]
and your your suggestions. Uh, we you
[10:43]
guys have received but I don't think uh
[10:46]
NHSP or D maybe have commented on the
[10:49]
revision. You guys want to stay focused
[10:51]
on the previous plan or continue on with
[10:54]
the revision? I think it pro probably
[10:57]
makes sense to
[11:00]
um
[11:02]
maybe approve the initial work um along
[11:06]
with the additional condition additional
[11:09]
work to be conditioned upon receipt of
[11:11]
approval by NHSB.
[11:13]
>> Okay. So
[11:13]
>> get you started.
[11:15]
>> Yeah. Do you want me to review that or
[11:16]
you guys have that information?
[11:18]
>> Um we pretty much have the information.
[11:20]
Um is there anybody on the commission
[11:22]
who would like to hear that again? Um,
[11:25]
>> I can bring up the new new plan and
[11:27]
maybe you could just touch on what
[11:29]
additional components are on the new
[11:31]
plan.
[11:31]
>> Okay.
[11:35]
» And then Bill, if you have any other
[11:36]
questions, just say so.
[11:38]
>> Okay.
[11:40]
>> Great. So yeah, from last time, uh it's
[11:44]
basically an addition of about 620 more
[11:48]
linear feet, which brings us up walkway
[11:50]
2 hooks around to the left and also uh
[11:53]
walkway 2 hooking around to the right to
[11:55]
where our original zone one began. Uh
[11:57]
that increases uh about 45 to 50 more
[12:01]
4in seat around posts as well as
[12:03]
signage. Everything else pretty much
[12:05]
stays the same. something um I kind of
[12:07]
wanted to touch base on again which um
[12:11]
Mr. Cook uh I know you suggested about
[12:13]
the snow fencing uh and the dangers of
[12:17]
uh you know the possible hazard for for
[12:20]
injury. Um I just to revisit that. I
[12:24]
love the idea of shrubs as well. Um
[12:27]
which was part of the addition as well
[12:29]
from last time. Uh bringing that on the
[12:31]
parking lot side, landward side of the
[12:33]
dunes. It's obviously we can't be
[12:35]
planting that on the frontal dunes. So,
[12:38]
if we were to use snow fencing on the on
[12:40]
the frontal dunes and as designed it it
[12:45]
traps sand and and brings that that
[12:47]
level up to where it might be a hazard
[12:49]
where someone's stepping over it, maybe
[12:51]
we could install another tier to raise
[12:54]
it up several feet so that that snow
[12:57]
fence in. So, we'd put another piece of
[12:58]
snow fence in to that new level and it
[13:01]
would be again four feet tall matching
[13:02]
the height of the dunes and we could
[13:04]
trap the sand that way. So, I mean,
[13:05]
someone would have to be jumping and
[13:08]
climbing over the fence at that point in
[13:10]
order to get injured with it being roped
[13:12]
off with the symbolic fencing and
[13:14]
signage and fencing on the parking lot
[13:17]
side. Would would that kind of appease
[13:19]
or or or
[13:21]
uh or you know reduce the fears of
[13:24]
someone getting hurt or because it
[13:26]
sounds like also NHSP they they uh and
[13:29]
fish and wildlife they um approved
[13:32]
everything. It sounds like is that
[13:33]
correct? They they did approve all the materials we used and
[13:37]
>> yeah, they didn't have any comments
[13:38]
pertaining to the the drift fence. Uh
[13:41]
>> yeah. Um how do you guys how do you guys
[13:44]
feel about that?
[13:45]
>> Um this is Commissioner Cook. As as far
[13:48]
as the snow fence goes, I don't have a
[13:50]
problem with the snow fence. Um it's
[13:54]
once it's been established for a while,
[13:57]
uh we get a major event and that's when
[14:00]
the problems occur. Uh the fences tend
[14:03]
to get torn up. Um and
[14:08]
I think maybe if we just put something
[14:10]
in there that says, you know, um the
[14:12]
snow fence will be maintained on a
[14:15]
regular basis
[14:17]
>> so that if we do have an event and they
[14:20]
start getting torn up, uh you can come
[14:22]
in and fix it.
[14:23]
>> That's that's reasonable.
[14:26]
>> Okay. Um, Kansas, is there anything else
[14:28]
you would like to say for your initial
[14:29]
comments before we open this up to
[14:31]
public comment?
[14:32]
>> Oh, sure. Um,
[14:35]
no. I I think I think uh
[14:39]
I think we can open it up. Yeah.
[14:41]
>> Okay.
[14:42]
>> One thing I might want to add just
[14:44]
before um the reviewer uh for this is
[14:48]
Devon Harrington. You probably know her
[14:50]
as the former assistant agent. Um, I'm
[14:53]
sure she's going to have no issues uh
[14:55]
with the additional uh symbolic fencing.
[14:58]
Um, I know she had drawn up plans very
[15:01]
similar that actually extended that
[15:03]
fencing much further down Ringer Cheeks.
[15:05]
I I imagine when she's back in the
[15:07]
office tomorrow, it'll probably be a
[15:08]
quick uh quick letter
[15:12]
that
[15:15]
>> Okay, let's open this up for public
[15:17]
comment. Is there anyone in the audience
[15:19]
who wishes to comment on the project at
[15:21]
NOI028-3110
[15:24]
at 232 Atlantic Street, Wingers Beach?
[15:29]
» Have no hands up on the Zoom and none
[15:31]
here in person.
[15:33]
>> Okay, let's go through commissioner
[15:34]
comments.
[15:35]
>> Member Cook,
[15:36]
>> I have no additional comments.
[15:39]
>> Sergeant,
[15:39]
>> no comments. Thank you.
[15:42]
>> No, we're good.
[15:44]
>> Member Jackson,
[15:46]
>> I'm good. Um, and Kansas, you're good if
[15:49]
we approve the initial work with the
[15:51]
additional work conditioned on receipt
[15:53]
of NHSP approval.
[15:56]
>> Yes, 100%. I I do have a question. Um,
[15:59]
>> sure.
[16:01]
>> Um, moving forward for revision. So, my
[16:04]
understanding is we have five years to
[16:06]
complete any of this related work under
[16:08]
these under the MESSA.
[16:10]
>> It's it's uh well the their letter is
[16:13]
good for five years. Typically the
[16:15]
notice of intent is good for three
[16:16]
years, but you can uh get extensions on
[16:19]
that.
[16:20]
>> And as far as future revisions, I I
[16:22]
didn't want to like shake things up last
[16:24]
minute, but um
[16:27]
revisions moving forward. We could start
[16:29]
this initial work and revisions can
[16:31]
still happen under this three-year
[16:32]
period.
[16:34]
Uh simple design revision like like
[16:37]
where to run the fence, for instance. It
[16:39]
is it's not it's advantageous to have a
[16:42]
hooking a hooking uh trail coming into
[16:45]
the beach versus being straight shot for
[16:47]
the wind, right? And creating the rope
[16:49]
where it hooks around might might be
[16:51]
beneficial to the way that
[16:53]
>> modification.
[16:54]
>> Yeah, I think I think as long as there's
[16:56]
not going to be any change in the impact
[16:58]
to the resource area, these these are
[17:00]
some some of these can be Yeah.
[17:02]
>> Is this stuff we could work like as we
[17:05]
>> Yes. If if you're in any doubt about
[17:07]
making any changes, just get in touch
[17:09]
with the agent and he will give you
[17:11]
guidance as to whether anything needs to
[17:12]
be filed or not.
[17:14]
>> Awesome. Thank you, guys.
[17:15]
>> Okay.
[17:16]
>> All right. In that case, I will
[17:18]
entertain a motion to approve the
[17:20]
initial work on 232 Atlantic Street,
[17:24]
Wingik Beach with the additional work um
[17:28]
on receipt of NHSP approval.
[17:31]
Commissioner Cook makes a motion to
[17:33]
approve NOI 0283110
[17:38]
at 322 Atlantic Street with the
[17:42]
>> seconds.
[17:43]
Member Cook.
[17:44]
>> Yes.
[17:47]
>> ID.
[17:47]
>> Yes.
[17:48]
>> Member Jackson.
[17:49]
>> Yes.
[17:51]
Okay.
[17:52]
You are all set, sir.
[17:54]
>> Thank you guys very much. I appreciate
[17:56]
it and I appreciate your time.
[17:58]
>> You're very welcome. Okay. Next up, we
[18:01]
have NOI 0283111
[18:03]
at 14 and 16 Lynx Road um by the
[18:07]
historic Cape Ban LLC. Commissioner
[18:09]
Jackson is recusing from this and Mr.
[18:13]
Cook will take over.
[18:17]
>> Okay. Um
[18:22]
» Okay. Thank you, Mr. Chairman. Uh for
[18:26]
the record, John Jud engineer with
[18:28]
Gateway Consultants uh representing uh
[18:31]
the applicant uh for this project at uh
[18:35]
Lynx Road as described at the last
[18:38]
hearing. I've shared my screen. Uh there
[18:41]
were some comments received by the uh by
[18:44]
the board. I'd like to go over those
[18:46]
quickly. I think we've accommodated most
[18:48]
of those comments or if not all of them.
[18:50]
Uh at the last hearing we uh was asked
[18:54]
why we couldn't move the structure out
[18:55]
of the buffer zone and uh my explanation
[18:58]
was this was the high point here and for
[19:00]
views and obvious reasons uh the
[19:01]
applicant uh went ahead and moved
[19:04]
everything outside the the buffer zone
[19:06]
with the exception of the Keystone
[19:08]
driveway which is needed to access these
[19:10]
uh uh these these uh garages here. So
[19:14]
for the most part everything has been
[19:16]
moved out. Uh certainly all the
[19:17]
impervious area has been moved out as
[19:19]
shown on the plan and uh that was the
[19:23]
first comment. Uh the duplex has also
[19:26]
been uh reduced and redesigned as shown
[19:29]
on the current plan. Uh the Peace Drive
[19:33]
has been labeled has been minimized and
[19:35]
has been pulled back as well. uh as
[19:37]
pointed out uh the detention basin uh
[19:41]
was requested at the bottom of the uh
[19:43]
the driveway at the the intersection of
[19:45]
Lynx Road. There was a uh some concerns
[19:47]
about that. In this area here, we've
[19:49]
added a uh mitigation area as well as
[19:52]
detention here, 40 foot long uh
[19:55]
infiltration vegetated infiltration
[19:57]
swale uh to mitigate any potential
[20:01]
runoff coming off this pvious driveway,
[20:03]
the Peace Driveway. Uh so that's been
[20:06]
added there. Um no blasting is proposed
[20:09]
in the buffer zone. So we've we've
[20:11]
accepted that and we have no problem
[20:13]
with uh putting that as part of the
[20:15]
order conditions should that be issued.
[20:17]
Uh snow removal areas have been proposed
[20:19]
outside the buffer zone here and here.
[20:22]
Uh that was requested by Mr. Shade. Uh
[20:25]
and again mitigation area at the bottom
[20:27]
200% of any work within the buffer zone.
[20:30]
Uh although it's all uh pvious stone, we
[20:33]
did uh provide uh the 200% there. Uh we
[20:37]
have added a infiltration swell detail
[20:40]
to go along the b the side of the
[20:42]
driveway uh as well as the uh toward the
[20:45]
bottom right here. And in addition to
[20:48]
these two areas here for overland um uh
[20:52]
infiltration for roof runoff and so
[20:54]
forth coming off that building that is
[20:57]
proposed and again all outside the
[20:58]
buffer zone and uh I think that was it.
[21:01]
If there's any other questions uh I'd be
[21:04]
happy to answer those at this time.
[21:06]
Thank you.
[21:07]
>> Okay. Like to open it up for public
[21:09]
comment.
[21:13]
Let's see. We have
[21:15]
couple hands up on Zoom and we have a
[21:18]
couple hands here in person. Uh let's
[21:21]
start with folks here in person.
[21:22]
>> Hi. Uh Sharon Tomlinson, Three Links
[21:25]
Road, Unit B. Um I have concerns of a
[21:29]
water issue. We have a serious flooding
[21:31]
issue on the street um that is affecting
[21:34]
our property, flowing down our driveway,
[21:37]
flowing into common backyard, and is
[21:40]
doing a lot of damage. We have lost some
[21:43]
trees due to the water issue um that we
[21:46]
have been trying to address for several
[21:48]
years. Um but it is difficult because it
[21:51]
is a condo situation. It is a private
[21:53]
road and it's affecting several houses.
[21:56]
The water is coming from across the
[21:58]
street and up the hill. So that is my
[22:01]
biggest concern is is this project going
[22:04]
to add more water displacement um
[22:08]
affecting the road.
[22:11]
Um I did send videos to um Miss Neand.
[22:17]
Um my latest issue was this past storm.
[22:21]
This um we had flooding that almost came
[22:24]
into our front door and this is an
[22:27]
ongoing issue where the water is just
[22:30]
continuously flowing. Whether it's a
[22:32]
nice dry day outside, we can still have
[22:35]
uh ducks in our driveway, which I'm
[22:38]
happy to send those pictures to
[22:45]
show. Hey, I'm Sue Klein. I'm from Eight
[22:47]
Links Road. Um while the water right
[22:50]
now, my water issues are not a problem,
[22:52]
I am concerned about the lacking of
[22:55]
interest really in mitigating the
[22:57]
impact. I mean, yes, they have moved the
[22:59]
building out of the buffer zone, but
[23:01]
these driveways still destroy a lot of
[23:04]
vegetation. These trees coming down, I
[23:07]
think they said seven mature trees to
[23:10]
replace that with only two saplings is
[23:14]
usually um not enough. They usually do
[23:17]
like if it's a 14-inch tree, they would
[23:20]
expect 14 1-in saplings in replacement
[23:23]
to even come close to being equal. But
[23:27]
of course, the root systems of these
[23:28]
mature trees and none of the mitigation
[23:31]
plantings are anywhere near the building
[23:32]
site. So all the water's going to come
[23:34]
down and probably destroy the plantings
[23:37]
at the bottom because it'll be too much
[23:39]
water for the system to even handle even
[23:42]
with with the swells and other things
[23:44]
that they've put in. There's so much
[23:46]
water that comes down. The road is
[23:48]
mostly just water um for a few days
[23:51]
after any sort of a rain event or a
[23:54]
melting event. Um, and I know that my
[23:57]
previous owners have put had done a lot
[23:59]
to mitigate the water situation. So, I
[24:02]
think I'm okay with how things are now,
[24:04]
but I'm nervous with what will happen
[24:06]
with this right behind my house.
[24:11]
» A couple hands up on the Zoom. The first
[24:13]
is uh Jim Town.
[24:18]
» Yes. Good evening. Thank you. Um, couple
[24:21]
questions. Uh, I'll just follow up on
[24:22]
the water and drainage. Um obviously um
[24:25]
there's a lot of water in this area and
[24:27]
if you go back over um other
[24:29]
conservation um projects uh brought in
[24:32]
front of here you'll see many issues um
[24:35]
a couple of them and have been raised by
[24:37]
other residents who spoke here. So
[24:38]
there's a lot of water issues. Um you
[24:41]
know specifically on that you'll see at
[24:43]
the area where there's the driveway
[24:44]
right now there's a actually a pipe that
[24:46]
comes out uh that drains water out into
[24:48]
the street in that area um off the
[24:50]
property. It appears to be right where
[24:51]
the driveway would be. So, I guess my
[24:53]
question would be um what's going to
[24:55]
happen with that pipe? How it'll go into
[24:56]
drainage that drains onto the street and
[24:58]
then it goes over into the area where
[25:00]
Bass Rocks um golf club uh has done a
[25:05]
bunch of mitigation with a sort of a
[25:07]
retaining area there. So, so what
[25:09]
happens with that pipe and that drainage
[25:11]
into the area um because it does does
[25:13]
flow right out of a sort of a PVC pipe.
[25:16]
Um the second thing is um before I guess
[25:20]
there was some commentary in the last
[25:22]
meeting that was presented about one
[25:24]
versus two driveways. I can see that
[25:26]
there's been some moda modification uh
[25:28]
with the movement of of the structures.
[25:32]
Um there's still sort of two driveways
[25:34]
up. Um maybe it doesn't go all the way
[25:36]
around. I can see on the newest map it
[25:38]
goes direct but is there any
[25:39]
considerations about just having one
[25:41]
single driveway um you know around uh
[25:44]
you know these particular matters uh
[25:47]
with with with the water and into the um
[25:50]
into the conservation area. So that's
[25:52]
the second question. Third uh I had um
[25:54]
raised this before but I I don't think
[25:56]
it was addressed from my previous
[25:58]
comments. Um, I understand that there's
[26:00]
uh could be some type of parking area
[26:02]
down at the bottom of the hill uh down
[26:05]
uh into the area where the conservation
[26:07]
is or directly abuing it. And so I don't
[26:09]
see that on these maps and I wanted to find out uh from from the applicant
[26:14]
process if they're planning to put a
[26:16]
parking lot area in there um either
[26:18]
initially or in the future um because
[26:20]
that also uh you know raises question
[26:23]
about the water in the conservation
[26:24]
area.
[26:26]
So that's my third question. Um and then going back to the um the the
[26:32]
trees um I I understand that from the
[26:34]
last meeting there was a request and I
[26:36]
see some pictures posted online um but
[26:39]
you know some trees are going to be
[26:40]
removed. I can't remember the exact
[26:41]
total seven or 10 I can't remember but I understood that they were going to be
[26:46]
sort of mapped out to show where those
[26:47]
trees were going to be removed. There
[26:49]
was some some commentary by the
[26:50]
conservation um about removing the trees
[26:53]
especially on the hillside and other
[26:54]
areas. Um, and so I'm just interested to
[26:57]
see which trees are going to be removed
[26:58]
where. So, thank you.
[27:02]
>> We have another hand up. Tracy Kio.
[27:09]
» Hi. Thanks very much. My husband Joseph
[27:11]
is here. We're 20 links Road.
[27:13]
>> We're just I just wanted to echo the
[27:16]
comments of the previous speaker. Have
[27:18]
similar concerns. We get a lot of
[27:21]
puddling uh up at the top of our drive.
[27:24]
And when I looked at the map that was
[27:26]
there,
[27:28]
um, initially, not the one that you just
[27:30]
showed, uh, I was concerned about the
[27:32]
amount of slab that was going to be put
[27:34]
down. Um, you reduce that a little bit,
[27:37]
but I'm going to emphasize and echo that
[27:40]
the driveway uh, a lotments here are
[27:43]
just too excessive for that area. Uh,
[27:45]
everyone will experience much more water
[27:48]
uh, coming down there, even as in the
[27:51]
revised plan. And I'm concerned also
[27:53]
about
[27:55]
the uh I guess lot number 17,
[28:00]
the way that drive makes that curve. Um
[28:03]
I don't know if that is required for
[28:06]
some reason or other, but I think that
[28:08]
needs to be redesigned too. Uh it's it's
[28:11]
actually going to create more problems
[28:14]
down at the base of that um street at
[28:17]
Lynx Road. and and this may not be
[28:20]
directly related to your conservation uh
[28:23]
duties, but that drive is blind now for
[28:27]
anybody coming down Lynx Road in the
[28:29]
opposite direction. So that needs to be
[28:32]
addressed no matter what, either in this
[28:34]
circumstance or later on. But right now,
[28:38]
as the plan exists, and there's no
[28:41]
other, as I understand it, mechanism for
[28:44]
dealing with the runoffs that occur in
[28:46]
that area. Now, there's no plan to deal
[28:49]
with these um runoffs should they get uh
[28:53]
worse by putting in this thing. When I
[28:55]
look at this structure, I think it's
[28:57]
going to get a lot worse and I think
[28:58]
people are going to be very very
[29:00]
concerned about that.
[29:04]
» Thank you very much.
[29:08]
» We have one more hand up. David Winer.
[29:13]
Hi, this is David Winer at three Lynx
[29:16]
Road unit A. I just wanted to to
[29:18]
emphasize virtually all the comments
[29:20]
that have been made. I mean, we at the
[29:22]
low end of Lynx Road um are the lowest
[29:27]
um elevation in Links Road. And as you
[29:30]
know, that's the that's where the water
[29:32]
ends up. And so, um, I would like to be
[29:35]
assured that any construction that goes
[29:38]
on in Lynx Road, um, doesn't add to the
[29:40]
existing problems we have, which are
[29:43]
very, very difficult to deal with. Thank
[29:45]
you.
[29:51]
» We have no other hands up at this time.
[29:54]
>> Okay. Um, moving to Commissioner
[29:57]
comments.
[29:59]
member Cook
[30:01]
like to thank you for all the changes
[30:03]
that you've made, John. Um, and really
[30:06]
that's all I have. I I It's going to be
[30:08]
a tough area no matter what. Um,
[30:12]
but
[30:14]
I think you've addressed all of the
[30:15]
major concerns that we had last year. I
[30:18]
mean, or at last meeting.
[30:21]
That's all I have.
[30:24]
Thank you for making the changes to the
[30:26]
plan regarding drainage improvements and
[30:28]
mitigation plantings. I encourage the
[30:31]
property owners to continue to work with
[30:32]
neighbors, see if there's something that
[30:34]
they can collectively do to ease a
[30:37]
difficult neighborhood drainage problem.
[30:38]
It's been going on for years and years. Um there must be a two-year
[30:43]
monitoring for the mortality of all
[30:44]
mitigation plantings and all water must
[30:47]
be adequately treated or being
[30:49]
discharged.
[30:51]
Uh, member Elites,
[30:53]
>> a couple questions. The the mitigation
[30:56]
at the bottom of the road, is that just
[30:58]
for the area of the driveway at the
[31:00]
bottom of the road or does that include
[31:02]
some of the area of that upper buffer zone
[31:08]
» and at the end you'll answer right now.
[31:11]
>> Oh, okay.
[31:12]
uh one of my questions and um you know I might echo a little one of the
[31:17]
concerns of the public comment that if
[31:20]
that's not the case then I do wonder
[31:23]
about the mitigation for the area the
[31:26]
driveways that goes over the buffer zone
[31:28]
in that upper um and I could see maybe
[31:32]
if looks like a big number down there
[31:34]
maybe it's inclusive of that and maybe
[31:36]
there's a reason why they can't get
[31:38]
plantings closer to the resource there
[31:40]
because a ledge or
[31:42]
um I could understand if that might be
[31:43]
the case, but if there's no mitigation
[31:46]
at all for those areas, I think, you
[31:48]
know, that may need to be discussed. Um
[31:52]
and in the past meeting, there was um a
[31:56]
comment that the
[31:58]
infiltration bail was also going to be
[32:01]
the line of disturbance. And if that's
[32:03]
still the case, I'd like to note that in
[32:05]
the order of condition.
[32:17]
» Okay. Um,
[32:20]
>> you want to go ahead and uh address the
[32:23]
>> I I didn't know if uh uh Mr. Shade had
[32:26]
any comments.
[32:27]
>> I I don't have anything additional at
[32:28]
this time.
[32:29]
>> Okay. Thank you. Uh maybe I'll just go
[32:31]
in reverse order while it's all fresh.
[32:33]
Um uh memory li uh had a question on
[32:37]
mitigation. So we have the mitigation uh
[32:39]
chart uh shown the total that includes
[32:42]
all of the mitigation and it was
[32:45]
emphasized at the last hearing where all
[32:46]
the water is heading down toward Lynx
[32:48]
Road. Maybe additional mitigation in
[32:50]
that area would be uh beneficial uh
[32:54]
coupled with the uh storm water uh
[32:57]
infiltration swale that's proposed
[32:58]
there. Um again, everything is
[33:01]
everything that's proposed here is
[33:03]
pvious in terms of the driveway surface.
[33:05]
So we're not only not increasing the
[33:08]
rate of runoff here, uh but we're going
[33:10]
to the the plan is to improve the
[33:12]
situation of any runoff coming down this road. We are proposing as far as
[33:17]
buffer zone mitigation over 14 trees. Uh
[33:20]
so I'm not sure where the butterhead
[33:22]
that uh two or three saplings. I'm not
[33:24]
sure where that came from. Um with with
[33:27]
respect to the drainage uh the applicant
[33:30]
is fully aware of this. Uh this 6 and 12
[33:34]
acres here at halfacre zoning. Um city
[33:37]
sewer uh you know any aggressive
[33:39]
developer could come in here and really
[33:42]
uh try to do something more aggressive
[33:44]
in terms of at least attempt it to do
[33:46]
more of a an aggressive subdivision. And
[33:49]
that's not it at all what anyone wants
[33:52]
uh particularly people in the
[33:53]
neighborhood uh nor the uh the
[33:55]
applicant. So I think there's been you
[33:58]
know in addition to the efforts that the
[34:00]
uh it's been made to move everything out
[34:02]
of the buffer zone as far as the
[34:04]
structure at the top uh in the Keystone
[34:07]
driveway and no blasting. Um I you know
[34:11]
I I think I would commend uh the the
[34:13]
applicant for for what's been proposed
[34:16]
and the changes associated with that. In
[34:18]
terms of the uh limit of work uh it's
[34:22]
we're absolutely
[34:24]
okay with that erosion control as shown
[34:27]
being the limit of work. I think that
[34:28]
was one of the questions. Uh and uh
[34:32]
again the drainage is the primary
[34:35]
concern of the abos as it should be. Uh
[34:38]
historically as long as I can remember
[34:39]
there's always been drainage uh issues
[34:42]
uh you know playing the golf course and
[34:43]
so forth and that's where it all ends
[34:45]
up. It's not going to end up over at
[34:46]
number three uh over there at Harriet
[34:48]
Road. It's not going to end up over
[34:49]
there because that's a higher elevation.
[34:51]
Uh everything that does come off this site uh will continue to uh come
[34:56]
off the site. uh it's not going to rain
[34:58]
any more or less now that this uh should
[35:00]
this be approved. Uh it's our
[35:02]
responsibility to mitigate it to the
[35:05]
extent possible. Uh it was requested
[35:07]
that the driveway have a an infiltration
[35:09]
swale. You can see the driveway section
[35:12]
uh that's been added to the plan. So
[35:14]
we're going to have a swale all the way
[35:15]
down this driveway to help infiltrate
[35:17]
any runoff that might be coming off of
[35:19]
the driveway. And as far as moving it
[35:21]
away from the Kio property uh and closer
[35:24]
to the town property, I'm not sure Mr.
[35:26]
town would like that. But uh this is uh
[35:29]
the uh the elevations here uh would
[35:31]
support the driveway location as it's
[35:33]
shown. That's pretty much where there's
[35:35]
an existing u gravel parking area. Now
[35:38]
there is no plan to have a a larger
[35:41]
parking area. That was one of the
[35:42]
concerns of the neighbors and that's not
[35:45]
at all uh what's proposed. Should any
[35:47]
change uh be uh asked or requested of
[35:50]
this plan, it would have to come back
[35:52]
before this commission. So, uh that is
[35:55]
uh there is no plan to do any parking
[35:57]
area at the bottom and we're trying to
[35:59]
enhance that lower area with additional
[36:02]
mitigation plantings over 2300 square ft
[36:05]
where right now there's a lot of um just
[36:08]
tall grasses and gravel uh right now. Um
[36:11]
so in an old tennis court so that would
[36:14]
uh the plan is to be u mitigated with
[36:16]
native plantings and I I believe I
[36:20]
addressed most of these concerns if not
[36:22]
all. Mr. Chairman, I can answer any
[36:23]
other questions you might have.
[36:27]
>> Um, commissioners, anybody have anything
[36:29]
else they'd like to add?
[36:32]
>> Okay, John. Uh, we have three uh we have
[36:35]
three members, so we need all three
[36:37]
members to vote for this. Do you want us
[36:39]
to vote tonight?
[36:40]
>> Yes, please.
[36:43]
>> Member Cook, we do have uh Butters that
[36:46]
uh I guess want to make more comments. I
[36:48]
don't know if you want to allow that or
[36:49]
not.
[36:51]
Yeah, go ahead.
[36:53]
>> Sorry. Thank you. I I just have one
[36:55]
follow-up question. Is there a plan to
[36:58]
um replace or fix the road as it gets
[37:03]
damaged with larger vehicles
[37:06]
um and construction going up and down
[37:08]
that road?
[37:13]
Is that something I can answer now, Mr.
[37:15]
Chairman?
[37:16]
>> Sure. Go ahead, John. Yeah, I can I can
[37:18]
assure you that this applicant will
[37:20]
replace any and all damage to this
[37:23]
private road. Uh, you know, it's it's
[37:26]
just not the makeup of this applicant.
[37:28]
Very uh well known in the community and
[37:31]
a very solid builder uh with a excellent
[37:34]
reputation for quality. So, uh, I can
[37:37]
assure you, uh, on my own reputation
[37:39]
that that any damage that should that
[37:42]
isn't already there that's going to
[37:43]
happen, should it happen, uh, will will
[37:46]
be repaired.
[37:47]
>> May we make that as a a condition?
[37:50]
>> Sure. Yeah, it's obviously it's in the
[37:52]
buffer zone, so that's absolutely within
[37:54]
your purview to do that.
[37:57]
>> Appreciate that. Thank you.
[37:57]
>> We do have another hand up on the Zoom
[37:59]
if you want to allow that.
[38:01]
>> Go ahead.
[38:03]
Uh Jim,
[38:05]
>> hi. A couple things. Um just actually in
[38:08]
comment to that. I would just point out
[38:10]
uh for the commission and uh Mr. Judge,
[38:13]
you might be aware actually the
[38:14]
applicant paved in front of there before
[38:16]
at their own cost. I understand it a few
[38:18]
years ago to make sure they were
[38:19]
maintaining in front of that. So from my
[38:22]
perspective, I I would agree uh in terms
[38:24]
of I I would imagine that if there was
[38:27]
any issue like that that the applicant
[38:29]
um would take care of it. That's that's
[38:30]
been the history that I've seen as well.
[38:32]
Um I think you satisfied the other
[38:34]
questions that I had. So thank you for
[38:36]
that. The only question is is that is do
[38:39]
we have any understanding of where the
[38:40]
trees would be removed and replaced on
[38:43]
this map or is that something that would
[38:44]
come out at a further time? Otherwise I
[38:46]
have no other questions or comments uh
[38:48]
or objections. So thank you.
[38:52]
» Want to answer John?
[38:54]
>> Sure. Yeah. The tree uh Mr. Sergeant had
[38:56]
asked uh where that tree was. Uh the
[38:59]
large tree up up top and that is it's
[39:01]
outside the buffer zone, but it's close
[39:03]
to the area of work. Uh if you'd like, I
[39:06]
can show my screen, but it's uh it's the
[39:08]
totality of the trees that we um you
[39:12]
know, as you know, the last meeting uh
[39:14]
we had some snow on the ground, but uh
[39:16]
we were hammered after that with
[39:18]
snowstorms. So we use the aerial uh the
[39:22]
aerial information uh to couple what we
[39:25]
already located. We have several trees
[39:27]
that are shown survey located but there
[39:29]
was some aerial uh additional trees that
[39:31]
we were able to uh you know augment our
[39:35]
uh our trees. So a lot of these are
[39:37]
outside the buffer zone. Uh but uh I'm
[39:41]
not sure if that answers a question but
[39:43]
throughout the site throughout the 6 and
[39:45]
12 acre site.
[39:47]
So, can I just clarification? Are the
[39:50]
saplings being planted
[39:53]
near where these trees are being taken
[39:54]
down or they're all being planted at the
[39:56]
bottom of that mitigation area? Because
[39:59]
it wasn't two saplings for for the seven
[40:02]
trees. You were saying two saplings for
[40:04]
one tree, but one tree needs probably at
[40:07]
least 14 to 30 saplings to equal the
[40:10]
water uptake. Because having drainage
[40:13]
just means the water flows. A tree will
[40:15]
actually take the water up and out,
[40:17]
which is what we need in that system for
[40:20]
the water not to keep doing the damage
[40:22]
that it's doing to all of the yards and
[40:25]
all the current plantings. I mean,
[40:28]
drain, you can put in drainage, but that
[40:30]
means the water is still going. The
[40:32]
trees and the vegetation take the water
[40:34]
out of the system.
[40:36]
No, I I don't dispute uh that uh evapo
[40:40]
transpiration, infiltration and uh
[40:43]
everything associated with the water
[40:46]
budget uh from the pre and post
[40:48]
conditions here. Uh the trees are an
[40:51]
important factor. Uh and the applicant
[40:54]
is fully on board with uh trying to
[40:56]
replace uh and making the the least
[40:59]
amount of damage. I think the the
[41:01]
efforts been made in terms of the pvious
[41:03]
surfaces. There's no pvious imperous
[41:06]
surface proposed particularly in the
[41:08]
buffer zone other than the roof runoff
[41:10]
and that's going to be handled through
[41:13]
uh open infiltration swells as shown on
[41:15]
the plan. Uh in addition uh this any
[41:18]
plan associated with a building permit
[41:20]
has to be also approved by the uh city
[41:23]
engineer. So, anything outside the
[41:25]
buffer zone, ma'am, uh I strongly
[41:28]
recommend that you get in touch with the
[41:30]
city engineer uh and and coincide with
[41:32]
them as far as any concerns you might
[41:34]
have.
[41:35]
>> Thank you.
[41:38]
>> Anybody else? Chuck,
[41:40]
>> we have no other hands up at this time.
[41:42]
>> Okay, seeing none hearing none, I'll
[41:44]
close the public comment period.
[41:48]
>> Sergeant moves to close the public
[41:50]
comment period.
[41:52]
>> 80 seconds. Roll call. Member Cook.
[41:55]
>> Yes.
[41:56]
>> Member Elites.
[41:58]
>> Yes.
[42:01]
» Moves to um approve 14 uh Ny 028311
[42:09]
14 and 16 links road with the approved
[42:11]
discussed conditions including road
[42:14]
repair if needed.
[42:18]
>> 80 seconds.
[42:19]
>> Call member Cook.
[42:21]
>> Yes.
[42:22]
>> Present.
[42:22]
>> Yes. member ladies.
[42:24]
>> Yes.
[42:26]
>> Okay. Thank you, John.
[42:28]
>> Thank you very much.
[42:32]
» For the record, Commissioner Jackson
[42:35]
returns to the meeting.
[42:36]
>> Okay. For the record, Commissioner Cook
[42:38]
has to recuse from this.
[42:41]
>> Okay.
[42:43]
All right. Next up is extension 0282523
[42:47]
at 16 Burberry Lane by Davis Associates,
[42:50]
Inc. And there has been a request to
[42:53]
withdraw this application without
[42:55]
prejudice.
[42:57]
Mr. Sergeant
[42:59]
>> Mr. Sergeant um moves to um approve the
[43:03]
request to withdraw without prejudice.
[43:05]
>> Commissioner second
[43:08]
call member Sergeant.
[43:09]
>> Yes. Member Elitees
[43:11]
>> and member Jackson.
[43:12]
>> Yes. Okay. Moving on.
[43:15]
>> For the record, Commissioner Cook
[43:16]
returned. Moving on, we have NOI 0283114
[43:21]
at 22 and 22 rear Eastern Point Road by
[43:25]
Thomas Schmidt. And there has been a
[43:27]
request to continue this to the meeting
[43:29]
of April 1st, 2026.
[43:33]
>> Commissioner Cook moves
[43:36]
uh requests move NOI 0283114
[43:41]
to the conservation meeting of April
[43:43]
1st, 2026.
[43:46]
Sergeant seconds.
[43:47]
>> Call member Cooker.
[43:48]
>> Yes.
[43:49]
>> Sergeant, yes. Memberes,
[43:51]
>> yes.
[43:52]
>> Jackson,
[43:53]
>> yes. And next up, we have NOI 0283115
[43:58]
at 75 Essex Avenue um owned by Dominic
[44:01]
Realy Trust for a new building addition
[44:03]
to existing building and replacement of
[44:05]
structure in existing footprint in
[44:07]
riverfront area, land subject to coastal
[44:10]
storm flowage and buffer zone to coastal
[44:12]
resource area. presented by John Jud,
[44:15]
Gateway Consultants, Inc.
[44:18]
>> Uh thank you, Madame Chair. Once again,
[44:20]
John Jud, engineer with Gateway
[44:22]
Consultants, representing uh the
[44:23]
applicant at 75 Essex A. Uh there was uh
[44:27]
some comments and some notes I took from
[44:29]
the last meeting. We followed up with
[44:32]
some modifications to the uh operations
[44:35]
and maintenance uh plan that was
[44:38]
requested by uh Commissioner Sergeant as
[44:41]
far as any potential accident or spills
[44:43]
within the building. We've modified
[44:45]
that. We've also modified the uh uh
[44:49]
standard number five on that application
[44:52]
uh to uh improve to sort of explain in a
[44:56]
narrative uh the uh improvements and so
[44:59]
forth associated with the um to the
[45:02]
extent possible portion of uh the
[45:04]
riverfront uh storm water u
[45:07]
calculations. Uh we did add a storm
[45:10]
scepter uh for the metal roof runoff
[45:13]
that was requested. That's an inline
[45:15]
storm water um storm septer that was
[45:18]
added to the plan as well. Uh and I
[45:21]
think that was the uh really the
[45:23]
essential uh
[45:26]
comments. Uh unless I missed something
[45:30]
um I can answer any questions you might
[45:32]
have.
[45:33]
>> Okay, we'll open this up first for
[45:36]
public comment. Is there anyone Is there
[45:38]
anyone in the audience who wishes to
[45:40]
comment on the project at 75 Essex
[45:42]
Avenue?
[45:45]
Uh we have no hands up in person and
[45:47]
none on the Zoom.
[45:49]
>> Okay. In that case, I will close the
[45:51]
public comment period. We'll move on to
[45:53]
commissioner comments.
[45:55]
>> Cook.
[45:56]
>> Um I have no additional comments.
[45:59]
>> Sergeant,
[45:59]
>> no comments. Ladies,
[46:02]
>> no comments.
[46:03]
>> Jackson,
[46:05]
>> um just a couple of comments. Um just
[46:07]
making sure of things. Um,
[46:11]
you've have the narrative on meeting
[46:13]
each storm water standard. Um, Chuck had
[46:16]
requested a flood path analysis, I
[46:19]
believe. Um, you've done the O andM,
[46:22]
you've done the storm septer and metal
[46:24]
roofs. We had talked about having some
[46:26]
kind of a coating and there was going to
[46:30]
be a twoft separation between the
[46:32]
chamber bottom and groundwater or there
[46:34]
would be a mound analysis. Those are the
[46:36]
things I had down. Um Chuck, did you
[46:39]
have anything to say to that or in
[46:41]
addition?
[46:43]
>> Uh
[46:45]
nothing in addition.
[46:46]
>> Okay, John.
[46:48]
>> Uh sure. Uh thank you, Madam Chair. As
[46:50]
far as the the mounding, uh so when you
[46:53]
have a redevelopment, uh you you meet
[46:56]
the standards to the extent possible. Uh
[46:58]
so in other words, you're not going to
[46:59]
be able to to to meet the 100red-year
[47:02]
event and everything associated with it.
[47:04]
say if this was a pristine riverfront
[47:06]
area or uh a a brand new development,
[47:10]
this is a redevelopment. So the intent
[47:12]
here uh of the storm water uh section
[47:16]
five standard five is to improve to the
[47:19]
extent practicable and those are the uh
[47:21]
the actual words. Uh we we looked at the
[47:24]
option of treating the roof. Uh but
[47:27]
that's not something that first of all
[47:29]
it's cost prohibitive to do that and you
[47:31]
and eventually that'll wear off over
[47:33]
time. So what we decided to do is
[47:35]
connect all the the roof runoffs uh
[47:38]
leaders into the storm scepter uh which
[47:41]
is a proprietary
[47:43]
uh part of the on andm that needs to be
[47:46]
maintained and inspected. So that's
[47:48]
actually a good thing because eventually
[47:50]
uh coatings and so forth wear off. So
[47:53]
that was in lie of the potential coating
[47:57]
of that roof. Uh that was a question I
[47:59]
believe of the applicant whether we can
[48:01]
code it or that. And I did talk to the
[48:03]
GC and he it's very expensive to do
[48:05]
that. It it's it doesn't last forever.
[48:08]
Uh
[48:10]
and um as far as flood vents, they're
[48:14]
all included uh on the design drawings
[48:16]
and that'll be part of the building
[48:17]
permit process. I think that was one of
[48:19]
the concerns.
[48:21]
>> Okay. And Chuck, you have no additional
[48:24]
concerns. I know you had some eyes to be
[48:26]
dotted and tees to be crossed. No, I
[48:29]
think I think the only thing uh really
[48:31]
would just be revisit that that page on
[48:34]
the checklist to make sure the box
[48:35]
correct box is checked for uh standard
[48:37]
five.
[48:38]
>> Okay.
[48:41]
Then I think we can go ahead with
[48:43]
this. Um would somebody like to close
[48:46]
the public hearing?
[48:48]
>> Commissioner Cook moves to close the
[48:50]
public hearing for NOI 0283115.
[48:54]
» Sergeant seconds. All member Cook. Yes.
[48:59]
>> Sergeant.
[48:59]
>> Yes. Member Eliadis.
[49:01]
>> Yes.
[49:01]
>> Member Jackson.
[49:02]
>> Yes.
[49:04]
>> Commissioner Cook moves to approve NOI
[49:06]
0283115.
[49:10]
» Sergeant seconds.
[49:12]
>> Call. Member Cook.
[49:13]
>> Yes.
[49:14]
>> Member Sergeant.
[49:14]
>> Yes.
[49:15]
>> Member Lees.
[49:16]
>> Yes.
[49:16]
>> And member Jackson.
[49:17]
>> Yes. All right.
[49:19]
>> Thank you very much. Appreciate it.
[49:21]
>> You're very welcome.
[49:23]
Next up, we have NOI028-3112
[49:26]
at 95 Eastern Point Boulevard, Jennifer
[49:28]
and Robert Colulbert to raise and
[49:30]
rebuild of existing home, repairs to
[49:33]
existing septic system, new pool,
[49:35]
terrace and associated land hardscaping
[49:38]
in land subject to coastal storm flowage
[49:41]
and buffer zone to coastal resource
[49:43]
area. Represented by Bill Manuel,
[49:45]
Wetlands and Land Management, Inc.
[49:48]
>> Good evening, Bill Manuel here. Jason
[49:51]
Camps is the ex building expert for the
[49:53]
project is just off camera here and John
[49:55]
is is joining us by Zoom this evening.
[49:57]
He's the engineer of record. Um we had
[50:00]
our first hearing and Chuck would you
[50:02]
mind putting the plan up the latest plan
[50:05]
we did reconvene with the butter Mr.
[50:07]
Gordon who was at the last meeting. I
[50:09]
believe we have uh mutually arrived at
[50:14]
uh solutions for preserving as much
[50:17]
vegetation as we can between the two
[50:19]
properties in that little what they call
[50:21]
the micro forest
[50:23]
and we actually added some additional
[50:25]
vegetation.
[50:26]
Uh this retaining wall which is along
[50:29]
the property line is now moved in and we
[50:31]
put this as close to the uh septic
[50:34]
system reserve area as possible.
[50:36]
Remember we saw two jutting uh retaining
[50:40]
walls here. Uh that was an uh an element
[50:43]
of discussion between the two parties.
[50:46]
That's been removed. Uh there'll be just
[50:49]
it'll be uh sort of blended into this
[50:51]
retaining wall and graded off the rest
[50:53]
of the way. And notice that we've added
[50:55]
more mitigation here. You'll look at
[50:58]
this white triangle here and wonder why
[51:01]
there's nothing in there. there's
[51:03]
already existing vegetation in there and
[51:05]
that was uh sort of the mutual
[51:08]
discussion that we had between the the
[51:10]
two parties that we preserve as much
[51:12]
vegetation existing vegetation that's in
[51:15]
what we called the micro forest here. Um
[51:18]
and so uh additional vegetation and
[51:22]
mitigation where we can we did move
[51:25]
there was an area here um there was a
[51:28]
request to try to move things closer to
[51:30]
the water. So we did shift this down uh
[51:33]
closer to the water here which will uh
[51:35]
sort of blend in uh with the uh the
[51:39]
mitigation that that we had shown here u
[51:42]
well it sort of complements this
[51:44]
vegetation and building off these
[51:46]
existing trees here. Uh so what the end
[51:49]
result is is that I believe we have a
[51:52]
better plan. Uh we actually have 200
[51:54]
square feet more mitigation than we had
[51:56]
at the last presentation.
[51:59]
And I believe Mr. Gordon, the neighbor
[52:02]
over here, he uh submitted an email
[52:04]
letter to the commission saying that uh
[52:07]
we mutually reached uh what we feel is
[52:11]
the best possible plan. I I also called
[52:14]
out this last tree here that I had
[52:16]
missed. Uh there are eight trees that
[52:19]
will be affected and we'll put back 16
[52:21]
trees. So, uh, we think we've done a
[52:23]
really good job here and like to close
[52:25]
the hearing and ask for approval.
[52:28]
>> Okay. Um, I will open this up for public
[52:31]
comment. Is there anybody in the
[52:33]
audience who wishes to comment on the
[52:35]
project at 95 Eastern Point Boulevard?
[52:38]
>> Uh, we have no hands up here in person
[52:41]
and there are none on the Zoom.
[52:44]
>> Okay, I'll close the public comment
[52:45]
period. We'll move on to commissioner
[52:47]
comments.
[52:49]
>> Cook. Uh, Bill, I'd like to thank you
[52:51]
for the changes, especially moving uh
[52:53]
some of the mitigation closer to the
[52:55]
resource area. Thank you very much.
[52:57]
That's it. I'm
[52:58]
>> Sergeant. Thank you for the changes to
[53:00]
the plan as well as working with the
[53:03]
neighbors. And there must be a two-year
[53:05]
monitoring for the mortality mitigation
[53:07]
plantings in a perpetual condition in
[53:10]
COC that prohibits further alteration
[53:12]
within the mitigation areas except as
[53:14]
may be required. Maintain those areas in
[53:17]
a mitigated condition. All water must be
[53:20]
adequately treated before being
[53:21]
discharged. Like to also incorporate the
[53:24]
EP's suggested conditions
[53:28]
and member
[53:30]
>> addition Jackson.
[53:32]
>> I have no additional comments. I
[53:34]
appreciate the changes as well.
[53:37]
Okay, then you're okay, Mr. Emanuel,
[53:40]
with incorporating the D comments.
[53:42]
>> Yes.
[53:43]
>> Okay, let's move forward.
[53:46]
>> Okay. Commissioner Cook moves to close
[53:48]
the public hearing for NOI 0283112.
[53:57]
» Sergeant Sexis member Cook.
[54:00]
>> Yes.
[54:01]
>> Sergeant.
[54:02]
>> Yes.
[54:03]
>> And member Jackson.
[54:05]
>> Yes.
[54:07]
>> Commissioner Cook moves to approve NOI
[54:09]
0283112
[54:12]
with the aforementioned conditions.
[54:15]
>> Sergeant seconds. Albert Cook.
[54:17]
>> Yes.
[54:20]
>> Member Jackson.
[54:22]
>> Yes.
[54:23]
>> You're all set.
[54:25]
>> Thank you very much.
[54:26]
>> Very much.
[54:28]
>> Okay. Moving on to new business. We have
[54:30]
NOI028 unassigned D number at 28 St.
[54:35]
Louis Avenue. um owned by Mark Anderson
[54:38]
Andreasen for a sewer connection in
[54:41]
buffer zone to BVW represented by John
[54:44]
Jud Gateway Consultants Inc.
[54:47]
>> You madam chair. Uh for the record, John
[54:50]
Jud, engineer with Gateway Consultants
[54:52]
representing uh the Andre's uh property.
[54:56]
Uh this is for a uh um sewer connection
[55:00]
and uh that's associated with a uh u
[55:04]
building addition that is proposed. And
[55:06]
let me see if I can pull this up or um
[55:09]
see bear with me for one second.
[55:15]
And
[55:18]
okay, let me get that.
[55:35]
Okay. Uh so this property uh was before
[55:40]
well recently we did a property across
[55:42]
the street for a sewer extension to come
[55:44]
down St. Lewis uh and Beimo uh right
[55:47]
down here uh to serve this property here
[55:50]
which is the Tadler property. This
[55:52]
property here is the subject property at
[55:55]
28 and uh there is a proposal to do an
[55:59]
addition on this this dwelling here. The
[56:01]
resource areas are exists in Niles Pond.
[56:04]
The wetland associated with Niles Pond
[56:06]
here. The buffer zone is here. Uh there
[56:09]
is also uh a wetland system that sort of
[56:12]
uh is associated with uh um Beimo A and
[56:16]
St. Louis A and then Culver system that
[56:18]
makes its way down across here and
[56:20]
across the Tadler property out toward
[56:21]
the harbor. And what this is the uh the
[56:24]
buffer zone area that we're we're
[56:26]
discussing right now. So the proposal is
[56:29]
this basically this one and a quarter
[56:31]
inch diameter uh pressurized um sewer
[56:35]
line that would make the connection into
[56:37]
that previously approved sewer extension
[56:39]
on St. Louis A. And that's uh the rest
[56:41]
of this project is outside the buffer
[56:43]
zone. It's between the these two buffer
[56:45]
zones here. So we're looking at this uh
[56:48]
this project right here. There is
[56:50]
erosion control proposed uh already and it's actually installed associated
[56:55]
with that wetland system across the
[56:57]
street and we're looking to uh get this
[57:00]
uh approved for this utility work here
[57:02]
for this pressurized sewer. The water
[57:04]
line already exists, the gas line
[57:05]
already exists into the house uh but
[57:07]
it's just the proposed sewer line
[57:09]
associated with the building addition.
[57:11]
Uh thank you.
[57:13]
>> Okay, we'll open this up for public
[57:15]
comment. Is there anybody in the
[57:17]
audience who wishes to comment on the
[57:19]
project at 28 St. Louis Avenue?
[57:23]
>> Uh, we have no hands up here in person
[57:25]
and there are no hands up on the Zoom.
[57:28]
>> Okay, we'll move on to commissioner
[57:29]
comments.
[57:31]
>> No comments.
[57:34]
>> Um, all water must be adequately treated
[57:36]
or being discharged. And I'm wondering
[57:39]
um the well in delineation I think is 11
[57:44]
years old. I'm wondering if it's still
[57:47]
accurate and if it might impact if it's
[57:50]
different if it might be impacting
[57:52]
future work that's planned. I'll leave
[57:54]
that to Chuck because he was out there.
[57:57]
Um but I I I'd like that answer. Yeah, I
[58:01]
could uh that was actually all freshly
[58:03]
delineated uh as far as the Tadler
[58:06]
project across the street. So, um we may
[58:09]
have reference an older delineation, but
[58:11]
that's uh freshly flagged.
[58:14]
>> Okay. Thank you.
[58:15]
>> Yeah,
[58:17]
>> it looked to me on the satellite like
[58:19]
where that passes through the buffer
[58:20]
zone there, that's just lawn, right?
[58:22]
Like it's not going to go through any of
[58:23]
that vegetation.
[58:24]
>> That's correct. Yeah. No trees removed.
[58:26]
It's right through the lawn area.
[58:29]
I'm I'm good.
[58:30]
>> And member Jackson,
[58:32]
>> no. My questions have been asked, so
[58:34]
that's works for me. And I will also
[58:36]
close the public comment period, which I
[58:38]
forgot to do. So, um, Chuck, did you
[58:42]
have any additional comments?
[58:44]
>> I don't. I assume this is just going to
[58:46]
be a uh
[58:49]
trench and and lay the pipe and back
[58:50]
fill kind of operation
[58:54]
being exposed. Yep.
[58:55]
>> Right.
[58:56]
>> Okay. I think we can move forward then.
[58:58]
>> Oh, we can't. We don't have a number.
[59:00]
>> Oh, we can't. You're absolutely right.
[59:02]
>> You're right. You're right, Bill. I'm
[59:03]
sorry. Yeah, I've been after DP all day
[59:05]
to try to get that, but
[59:07]
>> yeah. Well, okay. So, continue to April
[59:10]
1st, Mr. Jud.
[59:11]
>> Yes, please.
[59:13]
>> Commissioner Cook moves uh NOI028 no
[59:17]
assigned D number for 28 St. Louis
[59:20]
Avenue to the conservation meeting of
[59:22]
April 1st, 2026.
[59:26]
Richard seconds. C member Cook.
[59:29]
>> Yes.
[59:31]
Memberes.
[59:32]
>> Yes.
[59:33]
>> Jackson.
[59:34]
>> Yes.
[59:35]
>> Thank you very much.
[59:36]
>> Okay. Sorry about that.
[59:37]
>> Yeah. Nope. No problem. It's on us.
[59:40]
>> Okay. Next up, we have NOI 0283117
[59:44]
at 44 Vine Street. Paul A. Gree to raise
[59:49]
and rebuild in land subject to coastal
[59:51]
storm flowage riverfront area coastal
[59:53]
bank and buffer zone to coastal resource
[59:55]
areas represented by John Jud Gateway
[59:58]
Consultants Inc.
[1:00:00]
>> Thank you Madame Chair. Um I'm going to
[1:00:02]
pull up this uh if I can and show you uh
[1:00:06]
what's proposed on this particular
[1:00:08]
project at 14 uh I'm sorry 44 Mine
[1:00:12]
Street. Uh this is a u pre-existing
[1:00:16]
house that exists now uh and is proposed
[1:00:19]
to be reconstructed on the same
[1:00:20]
footprint here at 44 Vine Street. It's
[1:00:23]
on the Mill River u and uh it's
[1:00:27]
associated obviously with the
[1:00:28]
repairarian zone here. So we have the
[1:00:30]
100 foot repairarian zone here uh which
[1:00:32]
extends across the street. The Mil River
[1:00:35]
is here. Uh let's see if I can go down a
[1:00:37]
little bit here just to give a little
[1:00:40]
bit. Well, we say the Anisquan, but it's
[1:00:42]
associated with it is the Anisquan, but
[1:00:44]
the Mill River inlet. Um, and the uh
[1:00:49]
buffers, the 100 foot repairarian zone
[1:00:51]
is here. Uh, the existing footprint is
[1:00:53]
the hatch line here. Uh, and it includes
[1:00:56]
decks as well that there's an existing
[1:00:58]
deck here. Uh, so this has all been uh
[1:01:01]
gone through uh the zoning board of
[1:01:04]
appeals and uh we're looking to uh get
[1:01:08]
this approved. that will meet the the
[1:01:10]
current flood standards as far as the um
[1:01:14]
offset above um the flood zone of 13. Um
[1:01:18]
and let me see, we have mitigation
[1:01:20]
calculations as well uh that show the uh
[1:01:24]
riverfront area as far as the uh area of
[1:01:28]
mitigation and the uh proposed uh
[1:01:31]
impacts as well. uh that's shown on the
[1:01:34]
uh flood zone and um mitigation
[1:01:37]
calculations here in the riverfront uh
[1:01:40]
section right here. So again, it's
[1:01:42]
largely replacing the existing
[1:01:45]
dilapidated uh footprint of the
[1:01:47]
building. Uh the neighbors for a long
[1:01:49]
time have complained that this is one of
[1:01:52]
the last ones to be improved. Uh so uh
[1:01:55]
this is where we are uh in terms of uh
[1:01:58]
matching that as close as possible to
[1:02:00]
the existing uh imperous area and
[1:02:02]
mitigating 200% uh and also including um
[1:02:07]
improving the area as far as uh the
[1:02:09]
drainage which none exists now. So
[1:02:11]
there's quite a bit of uh drainage here
[1:02:14]
for infiltration off the roof but is
[1:02:16]
also the mitigation plantings on both
[1:02:18]
sides uh getting as close to the river
[1:02:20]
as possible. We are proposing a
[1:02:22]
flotation barrier here below uh the um
[1:02:26]
the deck that's proposed here which
[1:02:28]
should be uh suspended above above the
[1:02:31]
uh the mean high water as it does now. I
[1:02:34]
can answer any questions you might have
[1:02:36]
at this time. Thank you.
[1:02:40]
>> Okay, I'll open this up for public
[1:02:42]
comment. Is there anybody in the
[1:02:43]
audience who wishes to comment on the
[1:02:45]
project at 44 Vine Street?
[1:02:49]
Uh we have lost our inerson audience and
[1:02:53]
uh there are no hands up on the Zoom.
[1:02:56]
>> Okay, I'll close the public comment
[1:02:58]
period. We'll move on to commissioner
[1:02:59]
comments.
[1:03:01]
>> Member Cook.
[1:03:02]
>> Uh no additional comments.
[1:03:04]
>> Sergeant.
[1:03:05]
>> Um I don't believe the extended deck
[1:03:07]
over the intertital zone is permittable.
[1:03:10]
In order to be approved in the
[1:03:11]
riverfront area, the applicant must
[1:03:12]
prove that there's no other location for
[1:03:15]
the deck and that will not have a
[1:03:16]
significant adverse impact on the
[1:03:19]
resource area. This proposed deck would
[1:03:21]
create shading impacts to the rocky
[1:03:24]
title zone. For example, shading to
[1:03:26]
prevent rockweed from photosynthesizing
[1:03:28]
and rockweed is considered essential
[1:03:30]
fish habitat. And I'm wondering if all
[1:03:33]
work is supposed to be done from the
[1:03:35]
shore side. And based on the
[1:03:37]
photographs, it appears that there's a
[1:03:38]
tree by the shoreline to the north and a
[1:03:41]
couple of trees to the south along the
[1:03:43]
property line. These trees are not shown
[1:03:45]
on the plan. Please explain. And I'm
[1:03:48]
wondering how much of the building is
[1:03:50]
proposed to be on pipe leaks. And why
[1:03:53]
not move the building back to the 20ft
[1:03:55]
front yard setback? This would better
[1:03:57]
meet the criterion of a net improvement
[1:04:00]
to the riverfront area. And there must
[1:04:03]
be a 2-year monitoring for the mortality
[1:04:05]
of all mitigation plantings and a
[1:04:07]
perpetual condition in the COC prohibits
[1:04:10]
further alterations within the
[1:04:11]
mitigation area except as may be
[1:04:14]
required to maintain those areas in the
[1:04:16]
mitigated condition. And I uh note that
[1:04:19]
D made some technical comments you know
[1:04:22]
on this project as well need to be
[1:04:24]
answered. Thank you
[1:04:26]
member Alides.
[1:04:28]
>> Yeah, I second that. There's some D
[1:04:30]
comments there. One of them had to do
[1:04:32]
with uh delineation on the plan that I'm
[1:04:35]
not sure made it on there. So, that has
[1:04:37]
to be addressed. Um I had some questions
[1:04:39]
about on the plan itself things that
[1:04:43]
were if they're being removed or they're
[1:04:46]
remaining and being improved. There's
[1:04:47]
that lower deck when looking at the plan
[1:04:50]
down to the left, which I guess is the
[1:04:52]
north. Looks like it's remaining. It
[1:04:55]
doesn't really specify it's going to be
[1:04:56]
rebuilt or if it's just going to stay as
[1:04:58]
it is. Um, then there's a boat ramp on
[1:05:01]
the other side that I assume is
[1:05:04]
remaining, but also assume it's not
[1:05:06]
being improved on because that that's
[1:05:07]
not specified. Um, I had some questions
[1:05:11]
about the overhang deck myself. I think
[1:05:14]
uh, Mr. Sergeant had more concerns than
[1:05:18]
I did. I was looking at it in terms of
[1:05:19]
extending towards the resource, but it's
[1:05:21]
kind of an interesting question because
[1:05:23]
you sort of have that existing deck and
[1:05:24]
then you have sort of a transact
[1:05:26]
overlap. So, I'm not really sure the
[1:05:28]
answer to that. Chuck has any additional
[1:05:30]
input on that one. Um, that's that's
[1:05:33]
what I had.
[1:05:35]
>> Member Jackson.
[1:05:37]
>> Um, in addition to the above comments, I
[1:05:39]
wondered if you could get the plantings
[1:05:41]
on the right any closer to the resource
[1:05:43]
area. And you mentioned timber or stone
[1:05:47]
steps. Are they going to be pvious
[1:05:49]
impervious? And if they're impervious,
[1:05:51]
were they counted in the impervious
[1:05:53]
area?
[1:05:58]
Chuck, did you have any comments?
[1:06:01]
>> Uh, I believe the one comment that D had
[1:06:05]
was about the coastal bank delineation.
[1:06:07]
Um,
[1:06:09]
it is kind of a tricky site to to figure
[1:06:11]
out where that is. Uh, but I would be
[1:06:14]
interested in um Mr. Jud's uh comments
[1:06:17]
on that. Uh, the one question some
[1:06:19]
questions I had were related to uh, let
[1:06:21]
me pull up a photo here. Uh
[1:06:36]
so in the this is the back of the house
[1:06:38]
obviously uh right up against the river.
[1:06:40]
Um,
[1:06:42]
it looks like on the plan there's a a
[1:06:44]
slab at elevation 13, which is going to
[1:06:46]
be a bit higher up, but I was curious.
[1:06:49]
Um, you know, the current footings, uh,
[1:06:52]
you know, around this doesn't look like
[1:06:55]
a very stable wall. So, I was kind of
[1:06:56]
curious what type of work was going to
[1:06:58]
be needed, uh, you know, down underneath
[1:07:01]
the house and along this this area here,
[1:07:04]
which is right against the the river. um
[1:07:06]
you know what type of uh ports were
[1:07:08]
going to be put in there or if a slab
[1:07:10]
was going to be uh going all the way
[1:07:12]
down to grade or you know kind of what was going to be happening uh within
[1:07:17]
the portion under the house because
[1:07:18]
that's going to be uh within the flood
[1:07:20]
zone um and obviously uh pretty exposed
[1:07:23]
to the river itself.
[1:07:29]
» Okay. Uh several comments there.
[1:07:31]
Obviously, we we did see the D comments
[1:07:33]
that uh when we checked the portal and
[1:07:36]
we can add that um that transact to show
[1:07:39]
the coastal bank uh it's going from the
[1:07:42]
top Mr. Sergeant's uh concerns about not
[1:07:45]
extending the deck. Uh I will huddle up
[1:07:48]
with the applicant and the architect on
[1:07:50]
that and uh we will respond to that as
[1:07:53]
well. Um as far as all trees, I believe
[1:07:57]
all trees are shown. Uh we will double
[1:07:59]
check that there's a large tree as you
[1:08:01]
face the house with your back to the
[1:08:02]
road. There's a large tree on the right
[1:08:04]
that the applicant uh wants to keep. Uh
[1:08:07]
the neighbors would like to see it go
[1:08:08]
down, but he wants to keep it. Um uh
[1:08:11]
there really aren't any other trees that
[1:08:13]
I I can remember, but I will double
[1:08:15]
check that. Uh and we will show those.
[1:08:17]
But I believe all trees that are on the
[1:08:19]
site are shown on the plan. As far as
[1:08:22]
moving the house closer to the street,
[1:08:23]
we went before the um ZBA as I mentioned
[1:08:28]
and we did have conversations with the
[1:08:31]
building inspector as far as what he
[1:08:32]
considers the front yard setback uh
[1:08:35]
because of the right of way. His
[1:08:37]
position is as well as the attorney is
[1:08:39]
that we had to be conservative and and
[1:08:41]
hold the street right ofway easement
[1:08:44]
line as the uh actual front yard and
[1:08:46]
then we'd have to come back for the
[1:08:48]
front yard set back from there. So, we
[1:08:50]
were limited uh as far as moving it
[1:08:52]
closer to the street, but again, we're
[1:08:54]
going to, you know, nothing's going to
[1:08:56]
happen tonight. We can see that, but
[1:08:57]
we're going to um address that. Uh I'll
[1:09:00]
huddle up again with the attorney uh and
[1:09:02]
the client on that, the applicant. Uh as
[1:09:05]
far as the lower deck and what that
[1:09:07]
condition is uh and whether it's going
[1:09:09]
to be reconstructed or remain in place,
[1:09:12]
um I was told it was to be uh to remain.
[1:09:15]
And again, we'll have some more answers
[1:09:17]
on that at the next hearing as well as
[1:09:20]
the boat ramp and whether that will
[1:09:22]
remain or be reconstructed in the same
[1:09:24]
spot. If it was to be reconstructed, we
[1:09:26]
would have to obviously show that on the
[1:09:28]
plan. Uh and again, I think uh member
[1:09:32]
Eliot, sorry, I'm going to butcher the
[1:09:34]
name. I'm sorry about that. I haven't
[1:09:35]
met you yet. But uh uh as far as the uh
[1:09:38]
overhead deck uh and the um question
[1:09:43]
whether that can be approved or not, uh
[1:09:45]
we will look into that further and I
[1:09:47]
will mention that to the applicant. Um
[1:09:50]
as far as member Jackson's uh comments,
[1:09:52]
can we move the plantings closer to the
[1:09:55]
uh to the uh to the riverfront? We will
[1:09:57]
definitely look at that and I I am
[1:09:59]
certain that these steps uh are proposed
[1:10:01]
the stone steps would be pvious and
[1:10:03]
we'll make sure that's noted on the
[1:10:05]
plan. Uh and again Chuck had mentioned
[1:10:08]
the coastal bank transact from the D
[1:10:10]
comments. We're going to add that to the
[1:10:12]
plan as well. Uh I don't know
[1:10:14]
specifically the foundation plans and
[1:10:16]
where the peers are going to be
[1:10:17]
situated. So, we will have that
[1:10:19]
specifically uh submitted as an
[1:10:21]
attachment, a foundation plan and or uh
[1:10:25]
a notation on our plan uh to show where
[1:10:28]
piles are and what what's going to be
[1:10:30]
proposed below that building uh as far
[1:10:32]
as slabs and so forth. So, uh we
[1:10:36]
understand that there's many concerns
[1:10:37]
here. Uh we would like to ask for a
[1:10:40]
continuence to address those. Uh if
[1:10:42]
there's any other comments, I'd like to
[1:10:44]
get them now so we can have everything
[1:10:45]
addressed beforehand. Um,
[1:10:49]
>> okay. Thank you. Are there any other
[1:10:51]
comments from commissioners or from the
[1:10:52]
agent?
[1:10:54]
>> I think the only other thing would be uh
[1:10:57]
this this will probably require going
[1:10:58]
back to uh
[1:11:01]
possibly uh amend your chapter 91
[1:11:03]
license. I believe there's a current one
[1:11:05]
there for the uh
[1:11:09]
the lower deck and and possibly some
[1:11:10]
other uh
[1:11:13]
pieces there. But I believe if if the
[1:11:15]
there's changes and the addition of that
[1:11:17]
additional deck, even though it doesn't
[1:11:18]
touch the resource, it'll be over the
[1:11:20]
resource and therefore
[1:11:23]
amending that chapter 91.
[1:11:25]
>> Yeah. Yeah. Obviously, we would should
[1:11:27]
this be approved, any any changes would
[1:11:29]
have to uh be done after uh and you
[1:11:32]
know, order conditions be issued if it
[1:11:34]
if it's uh to be granted. So, we would
[1:11:37]
thank you for that.
[1:11:40]
>> Okay. And he addressed everybody's
[1:11:42]
concerns. Nobody's concerns got left
[1:11:44]
out. Um, they were either resolved or
[1:11:46]
promised to be discussed.
[1:11:49]
Okay. Mr. Jud, do you want to continue
[1:11:51]
to April 1st?
[1:11:53]
>> Yes, please.
[1:11:54]
>> Okay.
[1:11:55]
>> Commissioner Cook uh makes a motion to
[1:11:58]
move NOI 0283117
[1:12:02]
to the conservation meeting of April
[1:12:04]
1st, 2026.
[1:12:06]
>> Commissioner Sergeant seconds.
[1:12:08]
>> Member Cook.
[1:12:10]
>> Yes.
[1:12:10]
>> Sergeant,
[1:12:11]
>> yes. memberes.
[1:12:12]
>> Yes.
[1:12:12]
>> Member Jackson.
[1:12:14]
>> Yes.
[1:12:15]
>> Okay.
[1:12:16]
>> Thank you.
[1:12:17]
>> You have your homework. Thank you, Mr.
[1:12:19]
Jud. Next up, we have NOI 028 unassigned
[1:12:23]
D number at 163 Magnolia Avenue, owned
[1:12:27]
by Steven Keegan, upgrade to existing
[1:12:30]
septic system and buffer zone to
[1:12:32]
bordering vegetated wetland. Represented
[1:12:34]
by John Jud, Gateway Consultants, Inc.
[1:12:38]
>> Okay. Thank you, Madam Chair. Uh once
[1:12:40]
again uh for the record, John Jud
[1:12:42]
representing the applicant. I believe we
[1:12:44]
do have a file number and uh
[1:12:47]
>> that was uh I think issued during the
[1:12:50]
interim of uh when the uh um agenda was
[1:12:55]
posted. Let me see if I can pull up this
[1:12:56]
plan and and show you. This is a septic
[1:12:58]
system replacement in the buffer zone
[1:13:00]
for a plan that was approved by the
[1:13:02]
board of health already. Um
[1:13:04]
>> 311.
[1:13:05]
>> Not a lot of options.
[1:13:06]
>> It's 3116.
[1:13:08]
>> Okay. Thank you. Uh,
[1:13:10]
>> okay. Good.
[1:13:13]
>> All right. So, I'm going to pull this up
[1:13:14]
and and uh if I can and and just uh
[1:13:20]
see if I can
[1:13:23]
add it there a second ago.
[1:13:25]
>> Oh, yeah. There it is.
[1:13:27]
>> Do you see it? Subject system
[1:13:35]
too much water.
[1:13:38]
That's That's ideal conditions, Dave,
[1:13:40]
right there.
[1:13:42]
>> It's a sand filter.
[1:13:44]
>> It's It is a sand filter. Yes. Um, sorry
[1:13:47]
about this. I had it all queued up and
[1:13:55]
Okay.
[1:14:03]
All right. Sorry about that.
[1:14:17]
Okay, sorry about that. Uh, so once
[1:14:20]
again, uh, septic system replacement at
[1:14:22]
163 Magnolia Avenue. Uh, this is a, uh, a property. Anyone that drives
[1:14:28]
through Magnolia has seen this. It's, very close to the road. uh beige
[1:14:32]
house here and uh the wetlands
[1:14:36]
uh system exist uh along the entire side
[1:14:39]
of the property along the back corner
[1:14:41]
here and extend back into Magnolia
[1:14:44]
Woods. Uh and we have the buffer zone
[1:14:47]
associated with that here. So the entire
[1:14:49]
site has either wetlands or buffer zone.
[1:14:52]
Uh the existing system is consists of a
[1:14:56]
tank right here and a failed set uh
[1:14:58]
leeching pit here. Uh there is driveway
[1:15:01]
access here. There's an existing shed
[1:15:03]
here. We did have very good soil with a
[1:15:06]
high water table. Uh so we would try to
[1:15:09]
get this further away always uh to get
[1:15:11]
it away from the uh resource area.
[1:15:14]
However, we were limited by several
[1:15:16]
things including the area here, the
[1:15:17]
existing shed uh which is more much more
[1:15:20]
than a shed. It's in good shape. It's uh
[1:15:22]
it's a garage and it has uh lean area
[1:15:25]
here for for storage. Uh very important
[1:15:28]
to the homeowner. So what we're what
[1:15:30]
we've done is we did the soil testing
[1:15:32]
here and we uh improved the proposed
[1:15:35]
system to be advanced treatment uh with
[1:15:38]
uh pressure distribution and uh that
[1:15:41]
would be sufficiently above the
[1:15:43]
groundwater to meet all the state
[1:15:44]
requirements. Uh obviously much better
[1:15:47]
water quality going into the wetland
[1:15:48]
area. Um and uh again has been approved
[1:15:52]
by the board of health can answer any
[1:15:54]
questions you might have. We have
[1:15:55]
erosion control around the entire
[1:15:57]
section right here.
[1:15:59]
uh that borders uh that separates it the
[1:16:02]
resource area and the proposed work.
[1:16:05]
>> Thank you.
[1:16:05]
>> Okay. Thank you. I will open this up for
[1:16:08]
public comment. Is there anyone in the
[1:16:10]
audience who wishes to comment on the
[1:16:11]
project at 163 Magnolia Avenue?
[1:16:16]
>> Uh we still have nobody here in person
[1:16:18]
and uh no hands up on the Zoom.
[1:16:21]
>> Okay, I'll close the public comment
[1:16:23]
period. We'll move on to commissioner
[1:16:25]
comments.
[1:16:26]
>> Member Cook. um the existing system um
[1:16:30]
is just being crushed or filled in place
[1:16:32]
or how
[1:16:35]
>> you want to wait until the end. John,
[1:16:38]
>> you can that's a real quick answer. Uh
[1:16:40]
typically uh yeah, so that would be
[1:16:41]
pumped all components would be pumped
[1:16:44]
and um backfilled. The tank would be
[1:16:46]
removed and everything else would be
[1:16:48]
back filled with clean granular soil.
[1:16:51]
>> Okay.
[1:16:52]
>> Thank you,
[1:16:53]
>> Sergeant. Uh this improves existing
[1:16:56]
conditions. Thank you. Ladies,
[1:16:59]
>> um I had just a technical question more
[1:17:01]
for you, Chuck. With that
[1:17:04]
being less than 50 feet, that a variance
[1:17:07]
we approve or is that come from the
[1:17:10]
board of health or
[1:17:11]
>> that's a board of health variance? Yeah,
[1:17:13]
commissioner.
[1:17:15]
>> All right. Yeah, I would agree. I think
[1:17:16]
it probably improves the existing
[1:17:18]
conditions.
[1:17:20]
>> Jackson,
[1:17:21]
>> I'm sure it does improve the existing
[1:17:23]
conditions. Are you removing any
[1:17:24]
vegetation out in that area or is it a
[1:17:27]
grass area?
[1:17:29]
>> It's it's it's grass or several large pine trees that we show in the
[1:17:34]
plan and those are not proposed to be
[1:17:36]
taken down.
[1:17:37]
>> Okay, good. Yeah, the pictures showed a
[1:17:41]
lot of trees out there. Just making sure
[1:17:42]
you could fit into the bare space. Okay,
[1:17:44]
>> it worked out. It actually worked out
[1:17:46]
pretty well.
[1:17:47]
>> Okay, Chuck, did you have any additional
[1:17:49]
comments?
[1:17:50]
>> I I do not. I mean, it's kind of a tight
[1:17:52]
lot and kind of the only place to really
[1:17:54]
put that.
[1:17:55]
>> Yeah, it is tight. Okay, we can move on.
[1:17:59]
>> Okay, Commissioner Cook moves to close
[1:18:01]
the public hearing for NOI 0283116.
[1:18:06]
» Commissioner Sergeant seconds. We'll
[1:18:08]
call member Cook.
[1:18:09]
>> Yes.
[1:18:10]
>> Sergeant,
[1:18:10]
>> yes. Memberes,
[1:18:12]
>> yes. Member Jackson,
[1:18:13]
>> yes.
[1:18:15]
>> Okay. Commissioner Cook moves to approve
[1:18:17]
NOI 0283116.
[1:18:21]
» Sergeant seconds.
[1:18:23]
>> All member Cook.
[1:18:24]
>> Yes.
[1:18:25]
>> Sergeant.
[1:18:26]
>> Yes. Ladies.
[1:18:27]
>> Yes. Member Jackson.
[1:18:28]
>> Yes.
[1:18:30]
Okay. You're set.
[1:18:32]
>> I appreciate it. Have a good night.
[1:18:34]
>> You too. Okay. Certificates of
[1:18:36]
compliance. First up is RCOC 0281933
[1:18:40]
at 3 Welch Lane. Ratification of
[1:18:43]
unissued 2016 COC represented by Joel
[1:18:47]
Favaza Seaside Legal Solutions PC.
[1:18:50]
Chuck, any catch up on that?
[1:18:54]
>> Uh, I believe the uh the rest of the
[1:18:56]
discussion for 367 has been continued to
[1:19:00]
April 15th. So I imagine we will
[1:19:04]
resume discussion of the COC at that
[1:19:06]
time.
[1:19:08]
>> Okay. So not until April 15th.
[1:19:11]
All right. 26. Okay,
[1:19:15]
let's move on to our COC. We've already
[1:19:18]
taken care of 35 Masses,
[1:19:21]
so we will move on to RCOC 0282842
[1:19:25]
at 50 Essex Avenue. Chuck,
[1:19:30]
>> so we have a couple folks here for that
[1:19:32]
project.
[1:19:34]
Okay.
[1:19:39]
» Is here
[1:19:42]
would they like to speak? Name and
[1:19:44]
address for the record, please.
[1:19:47]
>> Uh Eric Kelly, principal with Apex
[1:19:49]
Companies uh in Wuburn, Massachusetts
[1:19:52]
for the city's design engineer record.
[1:19:55]
>> Okay.
[1:19:56]
>> And I'm joined tonight by my colleague
[1:19:57]
Dylan O'Donnell.
[1:20:00]
>> Okay.
[1:20:01]
and you're here for
[1:20:04]
you're requesting a certificate of
[1:20:06]
compliance for 50 Essex Avenue and you
[1:20:08]
feel you have fulfilled all of the
[1:20:09]
conditions.
[1:20:11]
>> Yes, Dylan, you want to step through the
[1:20:14]
>> Yeah,
[1:20:15]
>> please.
[1:20:15]
>> Sure. Thank you, commissioners. So, like
[1:20:17]
you said, we're here tonight for 50
[1:20:19]
Essex Avenue. Um we're formally
[1:20:21]
requesting the certificate of compliance
[1:20:22]
for the order of conditions, uh which
[1:20:24]
was issued for the project back in 2022.
[1:20:27]
So, we've submitted the the request for
[1:20:30]
certificate of compliance and we believe
[1:20:32]
the project has been constructed in
[1:20:34]
substantial compliance with the plans
[1:20:35]
and the conditions in the order. Um,
[1:20:38]
with that being said, there is one
[1:20:40]
condition in the order that's not yet
[1:20:41]
fully complete, and that's due to the
[1:20:43]
recent inclement weather. That's special
[1:20:46]
condition number 50, which requires that
[1:20:48]
stencils are placed on catch basin
[1:20:50]
inlets to indicate that the inlet is for
[1:20:53]
the disposal of storm water only and
[1:20:56]
that it discharges to waterways or
[1:20:57]
wetlands. So, we have a plan in place
[1:21:00]
with the DPW to get that stenciling done
[1:21:03]
on those catch basins once the weather
[1:21:05]
cooperates. Um, but other than that, concludes our request and um we'll
[1:21:10]
turn it back to you for any questions.
[1:21:12]
>> Okay. Thank you very much, Chuck. your
[1:21:15]
comments on this project.
[1:21:16]
>> Um, yeah, everything else looks really
[1:21:18]
good out there. Uh, I've been out there
[1:21:19]
several times uh throughout the process.
[1:21:22]
Uh, checking on the uh mitigation
[1:21:24]
plantings and all that. Um, and
[1:21:27]
everything's always looked uh, you know,
[1:21:30]
good order out there and and the
[1:21:31]
plantings are uh doing doing well. They
[1:21:34]
did have some uh stuff that was
[1:21:35]
replanted after the first season, but
[1:21:37]
uh,
[1:21:39]
everything I've seen out there looks
[1:21:41]
pretty good.
[1:21:42]
>> Okay. And you had suggested some
[1:21:44]
continuing conditions.
[1:21:45]
>> Uh so yeah, there are some continuing
[1:21:47]
conditions from the the order of
[1:21:49]
conditions. Uh mostly dealing with uh um
[1:21:52]
no uh storage uh storm water cleanout,
[1:21:57]
that sort of thing. Um so it looks like
[1:21:59]
uh special conditions 29, 51, 52, and 57
[1:22:04]
through 61.
[1:22:06]
>> Okay. Do any other
[1:22:09]
>> Did you have any additional comments,
[1:22:11]
Chuck? No.
[1:22:12]
>> Okay. Do any other commissioners have
[1:22:14]
comments on anything that's been discuss
[1:22:16]
discussed?
[1:22:19]
» We should if we're going to approve it,
[1:22:21]
we should approve it with those um
[1:22:24]
constituent conditions.
[1:22:25]
>> Yes, absolutely. Um Chuck, can we
[1:22:29]
approve this on the condition that the
[1:22:31]
stenciling get put into place?
[1:22:34]
>> I'm comfortable with that. We have, you
[1:22:36]
know, a continuing uh NOI out there for
[1:22:39]
additional work. Um, so it's, you know,
[1:22:42]
it's on my radar, but it's, you know, if
[1:22:44]
the commission is comfortable with that,
[1:22:46]
I I am.
[1:22:47]
>> Is there anyone who is not comfortable
[1:22:49]
with it? Speak now. Okay. All right.
[1:22:53]
Then I will entertain a motion to issue
[1:22:55]
the uh certificate of compliance for 50
[1:22:58]
Essex Avenue with the continuing
[1:23:00]
conditions and that condition of the
[1:23:02]
stenciling taking place.
[1:23:06]
>> Commissioner,
[1:23:06]
>> thank you very much.
[1:23:08]
Commissioner Cook moves to issue the
[1:23:11]
certificate of compliance for 0282842
[1:23:16]
at 50 Essex Avenue with the motions.
[1:23:20]
Sergeant seconds call. Member Cook.
[1:23:23]
>> Yes.
[1:23:24]
>> Sergeant. Yes. Member.
[1:23:26]
>> Yes.
[1:23:26]
>> Member Jackson.
[1:23:27]
>> Yes.
[1:23:30]
All right. You're all set.
[1:23:33]
>> Great. Thanks. Oh, we'll let DPW know
[1:23:35]
and we'll coordinate with Chuck once we
[1:23:37]
get the stencils installed.
[1:23:39]
>> That'd be wonderful. It's all we needed
[1:23:40]
to hear. Thank you so much.
[1:23:42]
>> Okay, take care.
[1:23:43]
>> You too. Okay, next up, violations e
[1:23:47]
enforcement order 2401 at 137 Wingershik
[1:23:51]
Road. Any new information on that one,
[1:23:54]
Chuck?
[1:23:55]
>> Uh, I hadn't heard anything. I reached
[1:23:57]
out uh to Mr. Nin uh yesterday. Um, I
[1:24:03]
know, uh, Mike D. Rosa has been on
[1:24:06]
vacation and has just returned. Um, and
[1:24:10]
Mike was included on an email today, uh,
[1:24:14]
saying that they will get out there uh,
[1:24:16]
the end of this week and kind of get the
[1:24:19]
plan together for the removal of the
[1:24:21]
ramp and then start working on uh, you
[1:24:24]
know, what needs to be done for
[1:24:26]
restoration plan and they have that to
[1:24:28]
us before the next meeting.
[1:24:31]
The ramp needs to be removed before
[1:24:32]
April 1st.
[1:24:34]
>> Yes.
[1:24:35]
>> And at the last meeting they said that
[1:24:38]
they would get done probably
[1:24:41]
by Wednesday.
[1:24:43]
>> Yes.
[1:24:43]
>> Right. And that didn't happen. So the
[1:24:46]
next meeting we have is April 1st.
[1:24:48]
>> Yep.
[1:24:49]
>> And if the ramp isn't removed, it can't
[1:24:51]
be removed after that
[1:24:55]
>> unless Yes. Unless there's uh um
[1:24:58]
approval of national heritage and that it doesn't come immediately either,
[1:25:04]
does it?
[1:25:06]
>> Um should we be potentially thinking
[1:25:09]
about um
[1:25:12]
financial penalties if it isn't done by
[1:25:14]
April 1st?
[1:25:16]
Uh up to the commission, but seems uh
[1:25:20]
>> I think that's eminently reasonable.
[1:25:25]
Um,
[1:25:26]
can I make a motion that we consider
[1:25:29]
that? Yes, you may.
[1:25:32]
>> I make a motion that if the ramp is not
[1:25:34]
um removed by April 1st that the
[1:25:37]
commission um um levy civil penalties,
[1:25:41]
you know, against the applicant for um
[1:25:44]
for violation.
[1:25:46]
>> I'll second that.
[1:25:49]
>> Roll call. Member Cook.
[1:25:50]
>> Yes.
[1:25:52]
realities.
[1:25:53]
>> Yes.
[1:25:57]
>> Okay. I will uh obey that. Uh
[1:26:01]
Mr. N.
[1:26:06]
» Okay. Thank you. Is there any other
[1:26:08]
business which has to come before the
[1:26:10]
meeting?
[1:26:13]
Um
[1:26:16]
the other update I have is
[1:26:18]
the member sergeant has about
[1:26:21]
a ton Kirk Road I believe.
[1:26:24]
>> Yes. Made a violation with the uh uh
[1:26:28]
floats being stored on the salt. Um I do
[1:26:32]
have a site visit out there scheduled
[1:26:34]
with Harbor Master and Shellfish on uh
[1:26:38]
Friday. um they they have applied for
[1:26:41]
the uh 10A permit and so we will get
[1:26:44]
there on Friday and I can update you uh
[1:26:47]
on what's happening on that after after
[1:26:49]
that visit.
[1:26:53]
» Okay.
[1:26:55]
Is there anything else?
[1:26:58]
I'm sorry I'm distracted. I have to get
[1:27:01]
a an injured lizard to a wildlife
[1:27:04]
center.
[1:27:07]
But um and I'm just going back with my
[1:27:10]
daughter to see who's going to take this
[1:27:12]
lizard. Um
[1:27:14]
>> is he insured through Gecko?
[1:27:17]
>> Is he what?
[1:27:18]
>> Insured through Gecko.
[1:27:21]
>> Truly truly. God, I sadly to say I don't
[1:27:25]
think he has any insurance whatsoever.
[1:27:28]
I didn't think my dog was outside with
[1:27:31]
my husband and I didn't think the dog
[1:27:33]
could catch anything. Um, these things
[1:27:35]
are fast. And apparently he caught this
[1:27:37]
one and my husband rescued it. But he
[1:27:42]
can't move his back legs. He can move
[1:27:43]
his front. He scurries around. So I have
[1:27:45]
to catch him. He's under a chair right
[1:27:47]
now with a dish of water beside him. So
[1:27:51]
I will see if I can catch him. I called
[1:27:53]
the wildlife center and they said if he
[1:27:54]
had been attacked by a dog, he needed to
[1:27:56]
be brought in. This is 35 minutes away.
[1:28:02]
» Oh god.
[1:28:03]
Yeah. So, we will see. I'll try to keep
[1:28:06]
you all posted.
[1:28:07]
>> Well, thank you.
[1:28:09]
>> All right.
[1:28:11]
So, if there's nothing else.
[1:28:13]
>> Nope. And I think it was a successful
[1:28:15]
meeting.
[1:28:16]
>> Yeah. We got a lot of things passed. We
[1:28:18]
got a lot of movement forward.
[1:28:21]
>> Good.
[1:28:23]
>> And one thing stalling and stalling is
[1:28:26]
stalling again at the end of Wingers.
[1:28:28]
>> Yeah. Yeah. He is. No question about
[1:28:31]
that. So, I think the more concerned we
[1:28:35]
can get him to be, the better off we
[1:28:37]
are.
[1:28:38]
>> Is the Is that the enforcement order?
[1:28:40]
>> Yeah.
[1:28:41]
>> Yep.
[1:28:44]
>> Okay.
[1:28:46]
>> Yeah. And the other one, Chuck, that you
[1:28:48]
can probably start mentioning to them
[1:28:49]
talking about the enforcement orders is
[1:28:51]
over at Whistle Stop. Uh, now that all
[1:28:54]
the snow's gone and, you know, within
[1:28:56]
the next couple weeks, um, I think they
[1:28:59]
should be moving into phase two.
[1:29:02]
Yep. I will reach out to them and kind
[1:29:04]
of see if they have a game plan for the
[1:29:05]
spring.
[1:29:10]
» Okay. Commissioner Cook makes a motion
[1:29:12]
to adjourn.
[1:29:14]
>> Sergeant seconds. We'll call member
[1:29:16]
Cook.
[1:29:17]
>> Yes.
[1:29:18]
>> Sergeant.
[1:29:18]
>> Yes. Memberes.
[1:29:20]
>> Yes.
[1:29:20]
>> And member Jackson.
[1:29:22]
>> Yes. We are all set. Thank you very
[1:29:25]
much, folks. Okay.
[1:29:26]
>> Go take care of a lizard.