Table, and we'll have everyone else do an
[0:05]
introduction. If you have any questions, go ahead
[0:07]
and throw that into the chat function or
[0:09]
do the raise the hand thing. That way,
[0:12]
we can make sure that we include you
[0:15]
into the dialogue here. So first, before we
[0:17]
go around, we'll start with Christy Christy Tidd,
[0:21]
Green County Department of Development. Vicky Sheets, Green
[0:26]
County Department of Development. Randy Gilbert, Sanitary Engineering
[0:30]
Department. DeAngelo Navratil, Greene County Regional Planning. Alright.
[0:36]
This is gonna be I don't know how
[0:37]
to to really it's kinda like herding cats
[0:39]
here, but if everyone who is logged on
[0:41]
and has the ability to access a mic,
[0:44]
if you just kinda introduce yourself real quick
[0:46]
and who you're with. But before we do
[0:48]
that, actually, is do we have anyone from
[0:50]
Greene County's IT Department on the call? Yes.
[0:54]
This is Mitch Fletcher, network admin. Awesome. Thank
[0:58]
you so much for coming. Mitch will be
[1:00]
our sort of point of contact for any
[1:02]
technical related questions that we might receive. Alright.
[1:06]
So if you can maybe start with the
[1:08]
Jacobs team and then we'll go with everyone
[1:09]
else. So Jacobs is our consulting agency that's
[1:13]
helping us build this RFP and a one
[1:15]
stop shop permitting solution. Yeah. I'll go first.
[1:19]
Oh, sorry. Janine, I think you're on mute.
[1:32]
Yeah. I got it now. Sorry about that.
[1:34]
Janine Dioriso, I'm one of the two key
[1:37]
main players helping pull this RFP together, and
[1:41]
we'll be walking through the scope of work
[1:43]
with you. Yep. I'm Eric Habermeyer with Jacobs.
[1:47]
I've been working with Janine just to kinda
[1:49]
help put this together. And then I think
[1:51]
for the rest, maybe just go alphabetically if
[1:53]
you can follow the no. I'll turn it
[1:55]
over to Ann. Albert, I think, is the
[1:56]
next on the list. Ann Albert, did you
[2:01]
there's a lot of echo. Not sure if
[2:18]
I'm next, but, this is Michael Bowen with,
[2:21]
three s g plus. Good morning, everyone. Eric
[2:24]
Sabato, MainStar. Brian Fatka, Maria Delisle, and Sandy
[2:31]
Hess, and we are all from the ICC
[2:33]
Community Development Solutions. Ben Smith with Tech Systems.
[2:44]
This is Ray Barker and Kara McFall with
[2:46]
Online Solutions Citizenserve. Eric and team, good morning.
[2:56]
This is Austin Kaiser with three s g
[2:58]
plus. A little out of order here, so
[3:00]
apologize for that one, but good to see
[3:02]
you guys. Hey. Good morning. This is Yeah.
[3:07]
Might be jumping as well, but Taylor Brodersen,
[3:11]
Helen Whiteco, and Savannah Harris all here with
[3:14]
Brightly Software SmartGov. Hey. Good morning. This is,
[3:20]
Harish Krishna with Tejas Gov together with, my
[3:24]
colleague, Nandan Naik from Atlanta, Georgia. This is
[3:30]
Gavira Corrido with Cityworks Trimble. Michael Romano, Cityworks
[3:40]
Trimble. Janelle Ennis, Cityworks Trimble. I'm not sure
[3:49]
if I'm in the right order here, but
[3:50]
I guess it makes the most sense for
[3:52]
us to introduce ourselves now. My name is
[3:54]
Matti Pujalt. I'm here with Tim Sharber. We
[3:57]
are both here with NV five Geospatial. Jason
[4:06]
Thompson, I'm here with Zipflo. Alright. Is that
[4:21]
everyone? The do we miss anyone here? This
[4:24]
is this is Shadrick Adams with Greene County
[4:27]
Public Health. I'm also responsible for the noise
[4:30]
at the beginning of the call, so I
[4:32]
apologize to everyone. My mic was on. It's
[4:34]
all good. Thanks, Shadrick. This is Chrisana Anderson
[4:37]
Lutz. I'm with Greene County Engineer. Thank you.
[4:42]
This is Al Kuzma, Greene County Building Regulation.
[4:52]
Right. I think that's everyone. Alright. So just
[4:56]
a minute, I'll hand things off to the
[4:58]
Jacobs team to kinda walk us through this
[5:00]
PowerPoint presentation. But before we get started, I'd
[5:03]
like to just make sure that we're all
[5:05]
tracking the same time frame here. So any
[5:08]
questions are due by January 30 by four
[5:12]
p. M. Eastern Standard Time. Our responses back
[5:15]
to you are due by February 6, '4
[5:17]
p. M. And all proposals are due by
[5:20]
February 20. And that is eleven a. M.
[5:23]
Eastern Standard Time. So with that, I'm going
[5:27]
to hand things off to Janine and Jacob's
[5:29]
team and they'll walk us through their presentation
[5:31]
here. Yeah, thank you. So there's the agenda.
[5:39]
Let's hit the purpose of the RFP real
[5:41]
quick. Eric, if you can go to that.
[5:44]
So that's that schedule overview. Oh, sorry. Eric,
[5:48]
can you go back to the schedule overview?
[5:52]
Sorry about that. And this is what Eric,
[5:55]
Henry was just speaking to. This schedule overview
[5:58]
is included in the RFP, so you can
[6:01]
see those dates. There is a note underneath
[6:04]
that that indicates, you know, these dates could
[6:06]
change, but for the most part, this is
[6:09]
the solid schedule that Greene County is looking
[6:12]
to follow. Eric, you want you can go
[6:16]
to the next slide. So how we want
[6:19]
to conduct a meeting. So support consultant is
[6:24]
us, Jacob. Greene County, and we will present
[6:29]
the topics listed in the agenda. We wanna
[6:31]
leave thirty minutes at the end for your
[6:34]
questions and answers. So let us get through
[6:37]
the core content. If you have a question,
[6:41]
jot it down, and when we open it
[6:42]
up, we'll certainly respond to those. And as
[6:46]
Eric said, the hand raise function is gonna
[6:48]
help us when we get to that point.
[6:51]
All questions we will be documenting any questions
[6:54]
that are raised here verbally, but you might
[6:56]
notice that in certain instances, we will say,
[6:59]
please submit that in writing, because we know
[7:03]
that that's gonna be information that, you know,
[7:05]
needs to be documented and and pushed back
[7:07]
out through, the response to questions. So just
[7:11]
be prepared for that. Okay. Eric, the next
[7:15]
slide. So purpose of the RFP, Eric Henry
[7:18]
gave a nice summary on that. And just
[7:21]
to really we're and we're not gonna read
[7:23]
all this text, but really focus on key
[7:26]
purposes. So technology solution, Greene County is looking,
[7:31]
for a permitting and plan review technology solution.
[7:34]
That could be one technology that encompasses all
[7:37]
the requirements and the things they're looking for,
[7:40]
or it could be a technology solution that
[7:43]
involves a couple of different technologies. It is
[7:46]
important to be mindful, and there's a technology
[7:49]
diagram included in the RFP, of the existing
[7:53]
technologies that they're working with. In certain instances,
[7:56]
a software such as stages that supports building
[8:01]
regulation, that's in that's staying. And so you'll
[8:04]
notice that there are some requirements around triggering
[8:10]
notifications between those two systems and and then
[8:14]
some. So take in mind that full suite
[8:18]
of software that they currently have in play.
[8:21]
There's a couple of mentions of software that
[8:24]
is optional. So this just indicates that Greene
[8:27]
County is thinking through a few things, about
[8:30]
their technology suite as it as it exists.
[8:34]
And when we're looking for costing of something
[8:37]
like an online phone system, I think is
[8:39]
referenced in there, it's labeled as optional. They're
[8:43]
considering that as part of the solution if
[8:46]
if that's going to improve things for them.
[8:48]
So take that in and be mindful of
[8:51]
those details when you're looking at them. Overall,
[8:55]
they are looking, as Eric said, this one
[8:57]
stop. This is this is a lot about
[8:59]
a key focus is on customer service and,
[9:03]
efficiency and processing permit applications and plan reviews.
[9:08]
And so ease of use on the customer
[9:11]
side, what what the end user has to
[9:13]
interact with simplicity, is a key objective in
[9:17]
what they're looking for. Also, you'll see reference
[9:21]
to smartly presented. So if I'm a customer,
[9:24]
I'm entering what I want to do, what
[9:26]
type of business I want to do at
[9:28]
Greene County. The system through entering of of
[9:32]
few keywords will help present to me the
[9:35]
process I need to follow, the permit applications
[9:38]
I'm I'm going to need to apply for,
[9:41]
the turnaround times that I can expect as
[9:44]
these applications go through internal review. So these
[9:49]
are key objectives that the county is looking
[9:53]
for. And then, of course, on the internal
[9:55]
side, having access to whose court is it
[9:58]
in now. I've reviewed it. I'm sanitary engineering.
[10:01]
I need to now have county engineer do
[10:05]
their thing. So, there are timings of push
[10:08]
notifications. So notifications and supporting that process is
[10:12]
another key objective. The staff are aware of
[10:15]
where things are at and and those turnaround
[10:17]
times and how they're performing in alignment. So
[10:21]
that's an expanded purpose and vision. Eric, you
[10:24]
can go to the next slide. So scoop
[10:27]
of work. So this is included in appendix
[10:30]
b as in boy. Eric, you can move
[10:33]
that past that slide. So boring text, I
[10:37]
know, but just to emphasize what the county
[10:39]
is looking for. So phase one on project
[10:41]
definition, you see a couple of key tasks.
[10:45]
So the scope of work when we lay
[10:46]
this out, we are asking you to present
[10:49]
a proposal that more or less follows what
[10:52]
is being asked for. You'll see a lot
[10:54]
of rigor, in the configuration stage around testing
[10:58]
and training. Those are critical elements because we're
[11:01]
really on cost client adoption, end user adoption,
[11:06]
and ease of use. In the project definition
[11:09]
phase, it's just, you know, setting out that
[11:11]
project management plan. What is your timeline? What
[11:14]
are the key, activities that will be going
[11:17]
on? And a key thing this informs is
[11:19]
you're working with busy people. Whoever selected will
[11:22]
be working with really busy people and they
[11:25]
need to know that schedule in advance of
[11:27]
when their time is going to be needed
[11:28]
so they can plan accordingly. And then, of
[11:31]
course, the kickoff meeting to explain how things
[11:34]
are going to move forward. On the next
[11:37]
slide, we're starting on phase two, which is
[11:39]
really the blueprinting. One thing I really want
[11:42]
to emphasize is Greene County staff, people around
[11:46]
the table that you're that are on this
[11:48]
call, and others did a lot of intense
[11:51]
work to envision what they wanted. And so,
[11:55]
you'll notice in the, right under the the
[11:58]
phase two blueprinting title, it says confirm business
[12:02]
processes. A big difference, and this is, something
[12:06]
to take note of, we are not asking
[12:08]
you to start from scratch and and pull
[12:11]
these people through a bunch of, well, how
[12:12]
would you like it to be set up?
[12:14]
How would you like it to work? They
[12:16]
have done a lot of great work toward
[12:18]
that end already, and it's very detailed business
[12:21]
process diagrams in that appendix b. That is
[12:25]
their vision. It's also been couched that, you
[12:28]
know, this may be your vision. You may
[12:30]
not get a % of of how you
[12:33]
want this to work. It may be 90%.
[12:36]
That's what we're targeting. Right? It's not a
[12:38]
hundred. But nonetheless, that is their vision. So
[12:41]
I've they've gone through a lot of effort
[12:43]
to do this. So I really wanna emphasize
[12:45]
that you're not hitting the you know, from
[12:47]
ground zero, you're starting a leg up. And
[12:51]
what came out, the tech technical the functional
[12:54]
requirements that you see in that Excel spreadsheet
[12:57]
that was included in the proposal package, that
[13:01]
we're asking you to fill out, those functional
[13:04]
requirements are directly related to those business process
[13:08]
diagrams by business process listed, and they are
[13:11]
categorized by permit type or plan type that
[13:14]
is being reviewed. So there is a one
[13:16]
to one alignment there. So those diagrams really
[13:19]
help understand what the county's asking for, from
[13:23]
a vision standpoint, and those functional requirements were
[13:26]
asking you to say, can your technology solution
[13:29]
do this? Is it out of the box?
[13:32]
Is it something that would need to be
[13:33]
created? You know? So they have some sense
[13:36]
of what your solution how many of those
[13:39]
requirements it actually needs. So as part of
[13:42]
blueprinting, that system implementation plan, you know, is
[13:47]
a task creating the that more detailed technology
[13:50]
set of steps, going through the functional requirements,
[13:54]
the business process, and then working with their
[13:56]
IT designated person around to make sure there's
[14:00]
an understanding around data security, any hardware or
[14:05]
interfaces to existing software. So, is that blueprinting
[14:10]
phase, a lot of work, but there is
[14:12]
also a starting point. On the next slide,
[14:16]
we show an example of those detailed business
[14:19]
process diagrams. I know you can't read that
[14:21]
on the slide, but they are in the
[14:23]
RFP. Again, you know, you'll kind of notice
[14:26]
workflows, and I know technology people are used
[14:29]
to looking at these. And you'll see the
[14:32]
existing systems reference as well as a generic,
[14:36]
blue cylinder data box that is labeled One
[14:39]
Stop. That's the technology solution. And so, that,
[14:43]
we're seeing what do we want One Stop
[14:45]
to do at a particular step. Okay. Next
[14:49]
slide. Then, during phase three, that realization phase,
[14:54]
the the confirmation of the plan of action,
[14:57]
the what what what the team the proposal
[15:00]
team is going to be doing to build
[15:01]
out. Now you're starting to realize and set
[15:04]
up those configurations. Again, you'll you'll see a
[15:07]
lot of reference to and they're in the
[15:09]
scope of work in that appendix b. It
[15:12]
describes what each of those testing steps entail.
[15:16]
But for those of you who are technology,
[15:18]
it's pretty best practice. Right? But a lot
[15:20]
of emphasis on testing, making sure data's flowing
[15:22]
because we've got several systems at play here.
[15:26]
And then training too. We're not looking for
[15:29]
a very simple one day training. This is
[15:32]
how you do it. But know that there's
[15:36]
a lot of, people not only on the
[15:39]
customer side, but on the, internal side that
[15:43]
come from different groups. So, the training can't
[15:47]
just be this quick one day. There's there's
[15:49]
some kind of focused training that needs to
[15:51]
go on. Again, because the the long term
[15:54]
interest is that they've got a solid technology
[15:57]
solution that's accepted and used and loved by
[16:02]
staff. Okay. Next one down. And then go
[16:10]
live. Of course, being there when things go
[16:13]
live, be there for when, questions are being
[16:17]
asked. And, in particular, in the costing sheet,
[16:20]
you'll see, there's an interest in knowing the,
[16:23]
just up to five years, what those annual,
[16:27]
five years cost would be, to provide the
[16:30]
maintenance and support. Alright. Next one. We're getting
[16:35]
to questions, guys. Okay. Last section that I'm
[16:38]
gonna talk through, and then we'll toss it
[16:40]
back. Go ahead, Eric. So just, this is
[16:43]
in the RFP itself, but just, verbalizing is
[16:47]
there's the address for where the hard copy
[16:50]
proposal should be submitted along with the USB
[16:53]
flash drive. So you'll see they're looking for
[16:55]
five hard copies. That includes that separate Microsoft
[16:59]
Excel spreadsheet where you are responding yes, no,
[17:03]
maybe with configuration, those types of things to
[17:06]
each of those requirements, and then an electronic
[17:09]
copy. So both the proposal itself and that.
[17:13]
And then the cost proposal, they want in
[17:15]
a separate field envelope. Alright, Eric. So the
[17:22]
proposal requirements, you're used to seeing these categories.
[17:28]
There are indications of page limits, so it
[17:31]
gives some sense of detail on what's being
[17:34]
looked for. Just clear writing, nailing the what
[17:39]
is being asked for and and providing that
[17:41]
exactly is a key. Right? Simplicity and clarity
[17:46]
is is is gonna be the key. You'll
[17:49]
notice on the e, item e, the proposed
[17:52]
technology solution, that's pretty short, two pages. It's
[17:56]
a basic statement of, okay, are the needs
[17:58]
that we have. What do you propose from
[18:01]
a technology? You may be teaming up with
[18:03]
another technology provider, or you may have the
[18:07]
whole enchilada in one suite. But the point
[18:09]
is is is that section is to say,
[18:12]
what is it? We're not looking for a
[18:14]
bunch of salesy material. We know sometimes people
[18:17]
will go their route of in a section
[18:19]
like that, you know, throwing in 10 brochures.
[18:22]
That's not what we're looking for. We're looking
[18:24]
for simplicity and clarity. Please state exactly what
[18:27]
you're proposing. And then it's in that item
[18:29]
f where we want you to detail out
[18:32]
the approach. And, again, the the key nugget
[18:35]
here is the approach is the scope of
[18:37]
work that's detailed out in appendix b as
[18:40]
in boy. So if you follow that scope
[18:43]
of work, obviously, you're professionals. There are variations
[18:48]
from that, which is fine and understandable. But
[18:51]
for the most part, you have the messaging
[18:54]
around intense testing, good training. Those are key
[18:58]
nuggets. Okay? Almost there. Okay. The cost proposal
[19:04]
sheet, which is appendix a, you'll notice just
[19:08]
out of the gate that in the table
[19:10]
itself, each of the, from the scope of
[19:14]
work, each of the numbered scope of work
[19:16]
items are listed there. The titles are listed
[19:19]
there, and that's where we're emphasizing, please follow
[19:22]
this approach. Right? How much would it cost
[19:24]
you to get through that, you know, the
[19:26]
estimate, any expense costs associated? On the expense
[19:30]
cost, you know, if there's a lot of
[19:33]
work you can do remotely and you're not
[19:35]
having to travel in, especially if you're not
[19:37]
local, that's gonna, you know, weigh well. So
[19:40]
you're balancing out that need of being in
[19:42]
person and the value of that versus work
[19:45]
you can be doing offline. And then on,
[19:49]
what's flashed up on the screen is the
[19:50]
second page of that. You'll see reference to
[19:54]
the interpieces, a potential for data migration if
[19:59]
the decision is to get rid of one
[20:01]
of their existing technologies, because this new technology
[20:05]
solution might place this. I say that with
[20:08]
the disclaimer. There has been no decision towards
[20:10]
that end. It's just a potential, and we're
[20:13]
leaving options open where where decisions still need
[20:18]
to be made. There are references in the
[20:22]
interfaces two to three non Greene County, so
[20:27]
statewide systems where different groups or divisions at
[20:32]
Greene County must interact with. You've got a
[20:34]
system like TOCAY. You've got the health department
[20:38]
uses HDIS. These are statewide systems. They are
[20:41]
not going away. So, you'll see referenced and
[20:44]
described in the RFP. And we've already had
[20:47]
conversations with those entities. But a a very
[20:52]
simple data exchange, whether that's a direct integration
[20:56]
or, a data export from those systems where
[20:59]
someone manually is bringing that into the new
[21:02]
technology system on the Greene County side, which
[21:05]
that latter is the more practical of what's
[21:08]
gonna happen based on what we know. Those
[21:10]
statewide systems don't want Greene County systems, you
[21:14]
know, feeding information in and out and exchanging.
[21:16]
So that data export process is is the,
[21:20]
route that is most likely. So but please
[21:25]
look at those costing things as, let's put
[21:28]
them in here as if it were an
[21:30]
integration on a couple of those data points
[21:33]
just for cost comparison and as prompted there.
[21:38]
I'm probably confused that just read what's written
[21:40]
there, which is please give us a cost
[21:42]
for an integration. But, again, for your back
[21:44]
pocket, most likely, will be a manual export
[21:47]
import. Okay. Almost done, Eric. Okay. The the,
[21:54]
functional and technical, requirements response work, which is
[21:58]
that Excel spreadsheet. Again, it supports the listing
[22:03]
of requirements as defined by Greene County staff.
[22:07]
We would like you to submit that, you
[22:10]
know, along with your proposal that's helping with
[22:13]
the evaluation that the voting members are gonna
[22:15]
be going through. It doesn't count on your
[22:18]
proposal page limit, and you can see the
[22:21]
number of different types listed there. So, functional,
[22:24]
how do we want it to behave? The
[22:26]
notification, routing, you know, display performance metrics against
[22:32]
processing time, those types of things. On the
[22:35]
technical requirements, that was heavily led by Greene
[22:39]
County IT, to help describe the technology environment,
[22:44]
any data and security requirements, those types of
[22:46]
things. And you'll see that categorization when you
[22:49]
look at that workbook. Again, there's two worksheets,
[22:53]
functional requirements, technical requirements. Okay? You can't read
[23:02]
that. That's just an image of what it
[23:04]
is. So you have the requirements listed on
[23:06]
the left, the category that it falls into,
[23:10]
and you're filling out those four blue columns
[23:12]
with, and there's some acronyms there that that
[23:15]
indicate, yes, the my technology solution can wholly
[23:18]
meet this. No problem. Or it can't. Right?
[23:22]
So and we recognize that a % of
[23:26]
everything Greene County has envisioned may or may
[23:29]
not be possible. Alright? The proposal evaluation criteria,
[23:37]
this is directly from the RFP. So we're
[23:40]
quality of the proposal references. Where have you
[23:43]
done something similar? We know it may not
[23:46]
be exactly similar, but, those references are important.
[23:51]
Your just general qualifications and experience. Is this
[23:55]
your first time ever doing this, or have
[23:57]
you done this, you know, 5,000,000 times kind
[24:00]
of a thing? That ability to meet desired
[24:03]
functionality, again, that workbook that has the functional
[24:06]
and technical requirements, that's, you know, an important
[24:12]
extremely important consideration for the voting members. And
[24:15]
then we've got the cost listed out as
[24:17]
well. And I think that's probably the last
[24:21]
slide for me. Eric Henry, I'm gonna toss
[24:26]
it back to you if you've got someone
[24:28]
there who can do this last section on
[24:30]
the contract forms and then we can open
[24:32]
it up to q and a. I I
[24:34]
don't believe we have anyone from legal on
[24:36]
the call. All I'll say about this is
[24:38]
these are required documents for your submittal of
[24:41]
of your bid. If you have any questions,
[24:44]
I'd ask that you send those in writing
[24:45]
so we can have our legal team go
[24:47]
ahead and review them. Then I'll put out
[24:50]
some sort of FAQ available to all to
[24:52]
make sure that those answers are able to
[24:55]
be reviewed by everyone once spent. So that's
[24:58]
all I have to say about that section
[25:00]
time being. Respond, I mean, about that. I
[25:09]
don't know if Jeanine, you wanna go over
[25:10]
that or I feel like it's self explanatory,
[25:14]
but I'm happy to encourage questions, comments on
[25:18]
this. Okay. Alright. Well, let's since that's a
[25:24]
nice segue, let's go ahead and open it
[25:26]
up for questions. Think Eric, Hob Habermeer, if
[25:30]
you can, do that, we can open it
[25:32]
up. So that was a lot. It may
[25:37]
rest, where let's go ahead and and open
[25:39]
it up for questions. And as, Eric Henry
[25:42]
suggested, if you don't mind using your hand
[25:44]
raise, that'll give some sense of order to
[25:46]
any questions. Let's see. And Eric Habermeyer, you
[25:57]
can help me. Why am I not seeing
[25:59]
the hand raised? Okay. Who's that? Taylor Roderson?
[26:05]
Yeah. Thank you. Can you hear me okay?
[26:08]
Yep. Yes. We can hear you. Perfect. So
[26:13]
I'm looking at it's mentioned a couple of
[26:15]
times the interfaces that are required and optional,
[26:21]
and I'm specifically looking at page 18 where
[26:24]
it has them, labeled out in a table.
[26:27]
I was curious, and I can kinda ask
[26:29]
these questions one by one, but I was
[26:31]
hoping to get a better sense of exactly
[26:35]
what each of these systems is used for
[26:38]
today. And secondarily to that question would be
[26:42]
if the solution that we're bidding on could
[26:46]
help consolidate some of these other systems. Is
[26:49]
that something you'd like us to propose as
[26:51]
well, or is the county looking to definitely
[26:55]
keep all of those in place and just
[26:57]
integrate? So sorry. Long question. It's a great
[27:02]
question. One thing that popped into my mind,
[27:05]
Eric Henry, I'm stalling for time because I'm
[27:07]
gonna toss it to you as the official
[27:08]
kind of take the questions and farm it
[27:12]
out. But, Eric Coppermeyer, if you don't mind,
[27:14]
I think, having the RFP, maybe we could
[27:16]
even pull up that page 18 might be
[27:19]
helpful. Yep. I'm pulling it up right now.
[27:24]
Okay. And, Taylor, to oh, sorry. There is
[27:28]
a diagram that I think is helpful. I
[27:30]
think it's figure two one that shows the
[27:34]
different technologies in play, and there's some commentary
[27:37]
about what type of information is desired to
[27:40]
be shared. Is that all the details at
[27:43]
the moment? No. But it gives that high
[27:45]
level. So anyway, Eric Henry, did I spell
[27:49]
enough for you? So for the first part
[27:51]
of your question, I would leave that to
[27:53]
the individual departments to answer specifically. The second
[27:58]
part, I'm gonna give you kind of a
[28:00]
nuanced answer. It's just probably not super helpful,
[28:03]
but in a perfect world, consolidation would happen.
[28:07]
That being said, it feels like it's it's
[28:10]
so burdensome and so complicated that it's unattainable,
[28:13]
but I'd be happy to look at proposals
[28:17]
that have that function in there. But it's
[28:19]
not something that I'm requiring at this time,
[28:21]
if that makes sense. So if I'm hearing
[28:26]
that correctly, you know, being able to interface,
[28:29]
you would want us to outline but would
[28:31]
also be open to a recommendation where we
[28:35]
may be able to consolidate. Correct. Okay. Yeah.
[28:40]
That's helpful. And I do see the 2.1,
[28:50]
so that's really helpful as well. But if
[28:52]
any of the departments have any other detail
[28:55]
that would be helpful for us on the
[28:56]
different systems, definitely open to hearing that. I
[29:02]
don't put you on the spot. What do
[29:04]
you I I I don't. Okay. We'll start
[29:08]
with the media room that we have here,
[29:09]
then we'll open it up to the people
[29:11]
on the call. So go to Randy with
[29:14]
sanitary first. Yeah. With sanitary, we use the
[29:17]
Cityworks. CityWorks is our main AMS asset management
[29:24]
system. We have the add on for the
[29:27]
PLL for all of our permitting, and all
[29:31]
of our historical permits are listed or are
[29:34]
contained in that software. So that is a
[29:37]
very vital piece of, history for us. While
[29:44]
it is listed as an optional, someone's going
[29:47]
to have to make a very good case
[29:49]
to me to move away from it. I
[29:55]
that's not going to be a decision that's
[29:57]
made likely. I'll I'll just say that. We
[30:00]
spent too much time and effort getting where
[30:02]
we're at. It's gonna have to be a
[30:05]
very great solution to move me away from
[30:07]
it. So I do wanna make that comment.
[30:11]
Now Tokay is the other one that we
[30:13]
utilize that's on this list. That's our backflow
[30:17]
prevention system. We keep track of all the
[30:21]
backflow devices in our system. Again, that's a
[30:28]
software that we've just we spent a lot
[30:29]
of time getting up and running. If there's
[30:32]
another solution, I guess we'd be we'd entertain
[30:35]
it. But, again, it has it would have
[30:38]
to have all of the abilities that that
[30:42]
software has it that we're used to and
[30:44]
our plumbers are used to before we would
[30:48]
consider moving. Deandra? Sure. So for regional planning,
[30:56]
we don't directly work with any of these
[30:58]
interfaces aside from GIS, but we use that
[31:01]
more for research purposes and for zoning research
[31:05]
and helping our people who call us with
[31:08]
questions on that. The only thing that we
[31:10]
would be looking for directly is the online
[31:14]
payment system because right now, we don't have
[31:16]
anything. We only take cash and checks at
[31:20]
the moment, so that's something that other departments
[31:22]
have obviously modernized on, and that's something we're
[31:26]
really gonna need assistance with. Awesome. Thank you.
[31:32]
I'm trying to think off the top of
[31:33]
my head. So let's go with public health.
[31:35]
Chad. Chadwick? Yeah. Chadwick here. We utilize the
[31:40]
program known as HDIS. That's health district information
[31:44]
systems. It's a very old, archaic database program
[31:51]
that encompasses just about everything that happens at
[31:54]
a health district from environmental to community health,
[31:58]
billing, receiving, tracking time, and mileage, all sorts
[32:03]
of things. Despite its age, we are not
[32:07]
looking for a replacement within the scope of
[32:11]
this of this proposal. Because it is so
[32:15]
old and somewhat sensitive, we want an export
[32:20]
only function with HDIS. That is we send
[32:24]
out our plumbing information into the one stop
[32:29]
shop database that we're proposing here, but it
[32:32]
would not be two way. Yeah. Sorry. I'm
[32:37]
gonna chime in here. This is Janine. And
[32:39]
that's indicated in the RFP as you just
[32:42]
said. Right? And I'm saying this for all
[32:44]
the proposers. Tokay that was referenced by Randy
[32:48]
Gilbert, which is the backflow prevention, that is
[32:52]
not intended to go away. It's just the
[32:54]
export activity. HDIS is another system that's used
[32:59]
at the state level that's not going away,
[33:02]
as well as a system called SWPPP. You'll
[33:07]
see that reference. That's a statewide, you know,
[33:11]
system as well. So, again, with those three
[33:13]
in particular, there's no replacement of that functionality
[33:17]
desired. Thank you. Let's go with Prasanna, are
[33:27]
you there for the accounting engineer? Yeah. I
[33:29]
am. Yeah. I just like to reiterate what
[33:31]
Janine just said, which is that SwiftTrack is
[33:34]
definitely something that we cannot replace. We're not
[33:37]
looking to replace. It's integral to what we
[33:41]
do with our storm water, and it does
[33:43]
an excellent excellent job with that. So we're
[33:45]
gonna go ahead and keep that the way
[33:47]
that it is. Apia is newer for us
[33:52]
and we are really liking the way that
[33:54]
it works. So we don't need to have
[33:57]
it replaced. But Apia is something that we
[34:04]
would consider if necessary, if someone had something
[34:07]
better out there. But it's working right now.
[34:13]
So that's about it. Fantastic. And last, certainly
[34:18]
not least, Al of the building department. Yeah.
[34:22]
Sage is, we're committed to that program. It's
[34:25]
our permit tracking system, plan review, also keeps
[34:31]
track of all our inspections. So, we're well
[34:35]
invested in that. We like it, and we
[34:39]
wanna keep it. Although, I do wanna keep
[34:43]
it open mind just in case there's something
[34:47]
else out there. But, you know, that would
[34:50]
be pretty exceptional for us to give up
[34:52]
on stages. And if anybody has So let
[34:56]
me let me do a summary here for
[34:59]
people on the phone who are, like, wait.
[35:01]
What's going on? There's, like, existing plan review,
[35:04]
permitting systems at certain and this is in
[35:07]
the RFP, but we're just verbalizing. You've got
[35:09]
building regulation. Al just spoke and he spoke
[35:12]
about stages, and that's indicated as something that
[35:16]
is not going away in the RFP. Stages
[35:19]
currently only handle plan, review and permitting tracking
[35:24]
for building regulation. The challenge is is that
[35:27]
other divisions who need communication and coordination and
[35:32]
and process flow to be supported as a
[35:35]
whole unit, is the county and these divisions
[35:38]
working together, a system like Sage's is not
[35:42]
currently supporting them. Similarly, when Randy Gilbert over
[35:47]
sanitary engineering was describing his use of Cityworks
[35:50]
for their asset management, that is not going
[35:53]
away. They're using, in to a a certain
[35:58]
degree, the PLL module of CityWorks. But, again,
[36:01]
it's just sanitary engineering. And you heard Randy
[36:04]
say, and it's labeled as optional. If the
[36:07]
new technology solution that we're asking for through
[36:11]
this RFP, does a with BAM job, right,
[36:15]
and could convince the Randy Gilbert and sanitary
[36:18]
engineering to release the CityWorks PLL component, then
[36:22]
that's what happens or vice versa. CityWorks PLL
[36:25]
is proposed to support larger divisions. I know
[36:28]
we got some CityWorks people. So you gotta
[36:30]
think of that, you know, it's the challenge
[36:33]
is it's being used, stages and both Cityworks
[36:35]
are being used by single group when it
[36:38]
needs to support all their groups or a
[36:41]
whole new technology solution is in play. So
[36:47]
that's kind of the big overview if you
[36:49]
hear people saying my plan in permitting review
[36:53]
software is not going away because it's already
[36:57]
supporting me. Did that confuse the matter or
[37:03]
bring clarity? I think that was really helpful.
[37:08]
I think all the feedback is helpful in
[37:10]
understanding where each department is. So thank you
[37:15]
very much. Looks like we have the next
[37:21]
question from Matthew. Yeah. Hey. Matthew here from
[37:30]
NV5 Geospatial. Out of curiosity, will Jacobs be,
[37:35]
providing a proposal to this RFP? No. We
[37:41]
are we we are not. We're a partner
[37:45]
with Greene County in getting the RFP ready
[37:49]
in alignment with their needs. Our role on,
[37:56]
the implementation phase of it is is TBD,
[38:01]
but but if there is a role there,
[38:03]
we would be helping to manage the implementation
[38:06]
and serve as a gatekeeper to answer questions,
[38:09]
those types of things. Okay. Great. Thank you.
[38:27]
Other questions? This is Taylor again, if it's
[38:34]
okay. I had one more. The RFP points
[38:38]
to 15 I think it was 15 unique
[38:41]
dashboards. Are there specific data points and dashboards
[38:46]
that the county is referencing for those 15
[38:49]
or just looking for the ability to create
[38:52]
custom dashboards? Great question. So, yes. So think
[38:59]
of the end user that 15 number is
[39:02]
up to, I believe that's the language, but
[39:06]
that's the intent anyway. Think of the end
[39:09]
users within the county. So you have, you
[39:11]
know, executive leadership is interested in tracking metrics.
[39:17]
How are we doing? In particular, are we
[39:19]
being responsive to customers? We have stated out
[39:23]
there that, you know, once you submit an
[39:25]
application, it takes so many days to process.
[39:29]
How are we as an internal group performing
[39:31]
against that? So I'm making this up because
[39:33]
we haven't yet defined those dashboards. What would
[39:35]
they like on their dashboard if they could
[39:37]
pick, like, 10 things? But that's the idea.
[39:40]
So executive leadership, the the directors of each
[39:44]
of the divisions, Randy Gilbert, you know, etcetera,
[39:49]
Stephanie Gough, they will have specific for their
[39:53]
own group and their responsibilities, you know, kind
[39:56]
of keeping an eye on the ball and
[39:58]
making sure things are proceeding process wise and
[40:00]
they have a sufficient time. So those are
[40:02]
the types of metrics more aligned with performance
[40:05]
metrics, but still TBD. In the RFP itself,
[40:08]
I think we're requesting the cost associated with
[40:11]
if you were out of the gate to
[40:13]
build a dashboard for them, how much would
[40:16]
that level of effort be with the intent
[40:18]
that they would, through the training, would then
[40:21]
have the competency internal to create, you know,
[40:25]
random dashboards, ad hoc reports, should they need
[40:28]
to beyond that. So we're just looking for
[40:31]
the pricing of the dashboard piece actually creating
[40:35]
them. Okay. Thank you. Hey, everybody. This is
[40:45]
Michael Vaughn from DraftG Plus. I had a
[40:48]
question about the getting back to the two
[40:51]
way integrations with some of the various systems.
[40:53]
Are is it known at this time whether
[40:55]
systems like Tokay and Sages, do they have,
[40:59]
like, a an open API that that that
[41:02]
can be accessed and leveraged? Or is that
[41:05]
is the expect is the expectation that that
[41:07]
will be investigated and and and included in
[41:10]
the response? Great question. So we headed that
[41:15]
off. We did work with Greene County to
[41:17]
reach out to representatives from each of those
[41:20]
software vendors, to get clarity on that, you
[41:23]
know, would would you be open to a
[41:26]
a connection through an API or, you know,
[41:29]
or or do you have strict rules about
[41:31]
that? And absolutely, say no. All of them
[41:35]
indicated the preference was for that manual export.
[41:39]
So but they also referenced, potential for API
[41:44]
connection. So does it need to be further
[41:48]
discussed with them once they see the actual
[41:50]
data points of what we're looking for? And
[41:52]
we did kinda summarize that for them so
[41:53]
they saw that it's really about notifications of
[41:57]
when something is done. So when something is
[41:59]
done, for example, in SwiftTrack, which is a
[42:02]
statewide system, it works well. That the the
[42:06]
status of whatever's being done in SwiftTrack is
[42:09]
pushed into that one stop portal so the
[42:11]
customer truly has. Can the customer go to
[42:14]
SwiftTrack separately? Of course. But we wanna bring
[42:17]
it all together to them in one place.
[42:19]
So it's really primarily notification of where the
[42:23]
process is at within those other systems. So
[42:26]
that's the that's the the the type of
[42:28]
information, But, yes, definitely needs to be further
[42:33]
discussed with them. But those connections are made.
[42:35]
They're aware of the potential request coming. And
[42:39]
if we cost it what that API, just
[42:42]
simple notification of process integration is, then we
[42:46]
know that cost associated with that option if
[42:48]
those in entities say yes. Okay. Great. So
[42:54]
so I'm thinking about in thinking about the
[42:56]
proposal, you know, our our our our charge
[42:59]
is to investigate, well, a, the possibility of
[43:01]
whether or not that's that's that can happen.
[43:04]
But just the the cost associated with whatever
[43:06]
development work would be required, you know, from
[43:11]
the platform that we're proposing, the one stop
[43:13]
shop platform, if you will, and and what
[43:15]
that would take to to to essentially push
[43:18]
that data into into these these other platforms.
[43:22]
But in terms of the return data, the
[43:24]
things that are triggered in in the the
[43:26]
Sages and the ToeCase of the world, you
[43:28]
know, that would require a little bit further
[43:30]
exploration with those entities in order to in
[43:33]
order to get that return data, if you
[43:34]
will. Am am I understanding that correctly? Yeah.
[43:38]
No. And you raised a very valid point,
[43:40]
and I I I hear you. How about
[43:44]
this? Greene County will note this as a
[43:47]
question that we officially respond to, in writing.
[43:52]
And do you mind just submitting that making
[43:55]
sure you submit that question in writing, and
[43:57]
then the county will have a response because
[43:59]
you raised a valid point towards that end.
[44:02]
Yeah. Yeah. Absolutely. We'll we'll make sure we
[44:04]
get something submitted. Thank you, guys. Bye. Yep.
[44:13]
What else? Hi. Kara McFall, Citizenserv. Will you
[44:18]
be providing the copy of the recording of
[44:21]
this conference? Eric Henry? I'm okay with it.
[44:31]
Excellent. Thank you so much. Yeah. And it's
[44:40]
it's a big it's a big, RFP. I
[44:44]
think you probably all noted that, and in
[44:48]
particular, the, I forget the name of the
[44:51]
woman who brought it up. Taylor. Taylor. Thank
[44:54]
you. You know, that technology diagram in 2.1
[44:59]
gives you that sense of, complexity, that they're
[45:04]
looking for with these different systems in play.
[45:09]
But at the same time, just that if
[45:12]
you keep that primary objective in mind, simplicity
[45:15]
on customer, I'm coming to I'm sitting at
[45:19]
home. I'm going I'm logging on. I'm typing
[45:22]
in a few keywords about what I wanna
[45:24]
do. And based on a search function, a
[45:27]
search engine, the system is communicating to me
[45:32]
the process I need to follow, the permits
[45:36]
I need to apply for, expected turnaround times,
[45:41]
right, processing times, and I'm able to follow
[45:45]
and see where my application is in at
[45:49]
the at any point in time. I also
[45:52]
know when I'm required to do something and
[45:56]
how long it's taken me. Right? And then
[46:01]
internally, again, the the same functionality is there
[46:05]
where internally they're able to see each other's
[46:08]
comments on plans. They're able to see tag
[46:11]
who's next because someone did just did something
[46:14]
in the field. So that vision really speaks
[46:18]
to efficiency and clarity of where I'm at
[46:21]
in the process. So those are the key
[46:24]
objectives. Even though there's a lot of existing
[46:28]
technologies at play here, If you kind of
[46:31]
think of it in that manner, it really
[46:33]
keeps that end goal in mind. Alright. I'm
[46:39]
very wordy. The county knows this, so I'll
[46:41]
stop. Eric, I'm gonna toss it back to
[46:42]
you. I have nothing to really add there.
[46:50]
Is there anything that we can clarify further
[46:53]
on or for anyone in the audience as
[46:55]
far as that last question goes? Any additional
[47:04]
questions? Well, not seeing any, so I guess
[47:13]
we can give you about an hour and
[47:14]
ten minutes back in your day there. If
[47:18]
you wouldn't mind submitting any follow on questions
[47:21]
in writing, that way we can make sure
[47:23]
we provide it as clear as a response
[47:25]
as possible. And, yeah, thank you for your
[47:28]
interest, and enjoy the rest of your day.