Agenda
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:05]
>>Good morning. We will kick off the
[0:09]
Audit and Human Resources committee
[0:10]
meeting. I will recognize Board members in
[0:11]
the room today. Board Director Judge Han,
[0:15]
Director Mayor Fry, Director Ponce and myself. Do
[0:20]
we have any public comment this morning?
[0:22]
>> We have one, Dominic Maisoc. He is
[0:24]
virtual this morning
[0:28]
>> Dominic?
[0:50]
>> Can you hear me now? Yes we can hear
[0:55]
you. Okay I was late on unmuting. Okay
[0:59]
I was thinking about something here,
[1:03]
about you go out and advertise jobs for
[1:07]
METRO and I have two actually two
[1:15]
possible sources. Number one, I think
[1:19]
they call Boy Scouts of America now
[1:23]
scouting USA due to legal things that
[1:26]
have happened. There's a group they
[1:28]
call explorers. These are people that,
[1:31]
this is open for men and women that are
[1:36]
looking for vocations and career
[1:38]
whatever. I don't know if you have to
[1:45]
have Cub Scouts and regular scouting to
[1:48]
go with it but I think that might be
[1:52]
some ideas to encourage people 18 and
[1:57]
above, or I don't know what the age
[2:00]
limit is, to look at METRO as a
[2:04]
possible place to work. That could also
[2:05]
be divided up into saying METRO PD,
[2:12]
operations, mechanics, where the rubber
[2:14]
meets the road, and the office group.
[2:18]
Secondly, as I'm thinking of HCC as
[2:23]
well the school district I know the
[2:24]
school is next to Kashmere. I think
[2:27]
there could be some interoperable
[2:31]
agreement to where students at
[2:32]
[Indiscernible] can do the classroom in
[2:33]
the morning and then come over to
[2:40]
Kashmere to do their lab work in the
[2:47]
garage also HCC has diesel mechanics I
[2:50]
think it's a different campus but it
[2:54]
could be an interagency agreement where
[2:58]
you do your class work at HCC, and then
[3:00]
you come over to Kashmere to do your
[3:05]
lab work. In each case, when the person
[3:11]
graduates, they are an apprentice. They
[3:16]
have apprentice rank. They would have a
[3:18]
union job under union 260 am paid to
[3:25]
work for METRO. Between those two
[3:28]
aspects, that could be two jobs at
[3:32]
METRO and the person would already be
[3:36]
pre-trained. Without having other
[3:37]
comments I send it back to you
[3:40]
>> Thank you so much Dominic, I
[3:46]
appreciate the comments raised and the
[3:51]
considerations thinking about how we
[3:52]
can better prepare the workforce and
[3:53]
partnerships with the school district
[3:54]
and community college. Are there any
[3:58]
comments? We will jump into the
[3:59]
briefings and then comments from board
[4:02]
directors. First up we have the monthly
[4:05]
compliance report from Chief Audit
[4:06]
executive Andrea Dennis
[4:10]
>> Good morning. Can we pull up the
[4:19]
audit dashboard please? Thank you. Can
[4:22]
you please go to the next slide. Here
[4:25]
is a summary of the internal audit
[4:30]
dashboard and activity as of the end of
[4:35]
December 31, 2025. Thus far we have
[4:37]
completed 107 audit projects, we have
[4:41]
17 in the process as of the end of
[4:46]
December. For the month of December a
[4:47]
total of 22 audit projects completed.
[4:49]
If you look toward the bottom of the
[4:53]
screen we have the internal functions
[4:56]
and IT audits, three of those have been
[4:58]
completed, seven of those are in
[5:01]
process and 10 currently not started.
[5:06]
We have a summary of the audit
[5:10]
recommendations we are tracking. We
[5:11]
have a total of 16 still outstanding.
[5:12]
If you go to the next slide please. In
[5:17]
the next three pages we have a list of
[5:19]
all audit recommendations we are
[5:22]
tracking through completion. As far as
[5:23]
changes in the report from the prior
[5:26]
month, we have four recommendations
[5:30]
that were implemented and have been
[5:34]
removed from this report. I want to
[5:35]
note the one item related to the single
[5:39]
audit KPMG that we were tracking has
[5:42]
been implemented and corrective action
[5:45]
noted on that item, in addition to
[5:48]
three other items. There were three
[5:50]
items extended this month due to
[5:54]
management needing additional time to
[5:56]
implement the items. Those items are
[5:57]
noted with a check mark. Please go to
[6:01]
the next slide. We have two more that
[6:05]
were extended. That concludes my
[6:06]
presentation do you have any questions
[6:10]
>> Are there any questions from
[6:14]
colleagues? no? Thank you for the
[6:18]
presentation. Next up we have the human
[6:22]
resources metrics report, Karen Kauffman
[6:23]
>> Thank you so much and good morning
[6:30]
everyone. This... Next slide please.
[6:33]
Nothing too significant to point out,
[6:38]
our headcount has remained fairly
[6:40]
steady at 4800 employees. Turnover has
[6:43]
dropped somewhat, about an eight
[6:45]
percent turnover now. Next slide. For
[6:52]
the month of January, we had 67 hires.
[7:00]
The one thing I want to point out here
[7:01]
are leave of absences are higher for
[7:02]
December but that's pretty typical. A
[7:03]
lot of times employees postpone
[7:07]
procedures until the holidays and so
[7:10]
on. Nothing to be concerned about in
[7:13]
that respect. This is a slide with the
[7:18]
applicant and hire demographics,
[7:19]
applicant demographics are on the right
[7:26]
as you saw in the month of December we
[7:27]
still had a fairly high number just
[7:29]
over 3400 applicants and the total
[7:33]
hires on the left are shown by gender
[7:38]
and ethnicity. Next slide. Wanted to
[7:39]
highlight several outreach events for
[7:45]
the month of December. One of the
[7:46]
events pictured here was a visit from
[7:50]
the Gateway Academy, a high school in
[7:51]
Houston for students with neurodiverse
[7:56]
challenges as well as other types of
[7:59]
learning disabilities. They came to our
[8:03]
facility at Kashmere and heard speakers
[8:07]
from various divisions, especially
[8:10]
within operations and staffing. We also
[8:11]
partner with Goodwill industries and
[8:15]
had an event and had our open house at
[8:16]
the Kashmere facility for bus operators
[8:20]
service drivers and mechanics. Next
[8:24]
slide. This shows the hiring incentives
[8:25]
that were paid for the month of
[8:30]
December. As usual, the highest number
[8:32]
were for bus operators. We had 73
[8:36]
employees eligible also several of the
[8:39]
maintenance positions as well. In the
[8:40]
footnote I wanted to mention too we
[8:45]
continue to have bilingual incentives
[8:46]
for our public interfacing employees
[8:51]
who qualify for those. Also had
[8:52]
payments in the month of December for
[8:56]
those 359 employees participating in
[9:03]
that program. Next slide. This shows a
[9:05]
list of the new positions that were
[9:06]
hired for the month of December, bus
[9:08]
operators being the highest number. We
[9:14]
had a number of wellness events in
[9:20]
December. One was nutrition which was
[9:22]
timely with the holidays and all of the
[9:25]
holiday festivities. We had several
[9:29]
financial wellness sessions as well as
[9:32]
our partnership with the Gulf Coast
[9:33]
regional blood center for a blood
[9:35]
drive. Next slide. This shows our
[9:43]
schedule of classes through our
[9:44]
training and organization development
[9:45]
group for January and February. We have
[9:47]
a number of technical classes for
[9:50]
Microsoft products as well as things
[9:51]
like time management professional
[9:54]
development business writing. I wanted to
[9:57]
highlight a couple of courses for our
[10:01]
employees who want to move up within
[10:06]
the organization and perhaps interview
[10:07]
for other positions so we had one that
[10:09]
had to create an effective resume and
[10:12]
interviewing skills we do provide those
[10:16]
types of them to help prepare employees
[10:17]
for future positions at METRO. Next
[10:24]
slide. One of the new recognitions we
[10:27]
are doing now is to recognize employees
[10:30]
who are the most active in the
[10:32]
e-learning online learning program.
[10:33]
This is something they can do on their
[10:38]
own with guidance from their management
[10:39]
as to which classes are appropriate for
[10:42]
their roles. We had two employees, Chad
[10:47]
small and [Indiscernible] O'Bryant
[10:49]
recognized for the courses they took
[10:50]
during the year of 2025. That concludes
[10:53]
my presentation.
[10:58]
>> Are there any questions or comments?
[11:05]
no? thank you again for the updates we
[11:09]
appreciate it.
[11:10]
>> With that, we will close out today's
[11:13]
audit human resources committee
[11:16]
meeting. The time is 9:15 AM folks, we
[11:26]
posted for 9:30 AM for the next
[11:30]
committee meeting our finance committee
[11:34]
will begin here in 15 minutes at 9:30
[11:35]
AM.
[11:41]
>>
[26:06]
>> I think we need to get started. I
[27:47]
think we are ready to begin the finance
[27:52]
and business administration committee.
[27:55]
It is 9:31 AM. The first item on the
[27:58]
agenda are public comments
[27:59]
>> We have Dominic Maisoc virtual
[28:02]
>> Okay
[28:05]
>> Dominic?
[28:14]
>> He does not appear to be on.
[28:35]
>> We will move forward. We will come
[28:43]
back if he joins. We are going to start
[28:44]
with the briefing item the monthly
[28:48]
financial reports, George? Thank you
[28:52]
Chair Morales and members of the
[28:53]
committee George Fotinos METRO Chief
[28:54]
Financial Officer presenting the CFO
[28:57]
report for today's committee if I could
[29:01]
have the presentation please. To let
[29:04]
you know this presentation will
[29:05]
summarize high-level points detailed
[29:08]
and monthly reports you will pass on as
[29:10]
action item to the full board including
[29:11]
the sales tax report investment report
[29:13]
that report fuel hedge reporting
[29:15]
monthly performance report. Next slide
[29:20]
please the first slide presents the
[29:21]
sales tax revenue the authorities
[29:26]
largest source of income. These numbers
[29:29]
represent activity from two months ago
[29:30]
January number two represent activity
[29:33]
from November. Recall last month I
[29:35]
reported to the board that we have
[29:39]
received an updated forecast of sales
[29:41]
tax revenue for University of Houston
[29:42]
Center for economic growth and
[29:45]
opportunity. The forecast reduce the
[29:46]
expected amount of sales tax revenue
[29:48]
the amount we receive after general
[29:55]
mobile by 25 million so with this new
[29:56]
info we reduce the expected revenue
[29:58]
amount for remaining months, that's the
[30:01]
bars you see for FY 26 beginning in
[30:06]
January year to date we received 359.4
[30:08]
million in cash from sales tax revenues
[30:13]
because the first two months of the
[30:14]
fiscal year October and November were
[30:17]
below targets we are playing catch-up
[30:20]
with a $5.8 million Delta
[30:21]
underestimates for the four month
[30:24]
period. However we are 13.2 million or
[30:27]
3.8 percent over the year to your cash
[30:28]
collections at this point last year. In
[30:31]
the month of January we receive
[30:34]
[Indiscernible] 2.1 or 2.4 percent
[30:39]
overestimates and 4.7 million or 5.6
[30:40]
percent more than January year ago. On
[30:45]
the next slide all the remaining items
[30:47]
reflect activity through December. This
[30:51]
slide is the farebox revenue slide
[30:53]
through December total $9 million. Year
[30:58]
to date we are running on budget with
[31:02]
projected estimates. Comparing farebox
[31:04]
revenues through December of last year
[31:05]
we trailed by 1.1 percent, $100,000.
[31:12]
Next slide please looking at a detailed
[31:14]
breakdown of METRO year-to-date farebox
[31:17]
revenue by different modes. Local
[31:18]
network including rail is 1.4 percent
[31:23]
lower commuter bus is higher in line
[31:26]
with the growth we see in
[31:30]
park and ride ridership. Vanpool is 100
[31:31]
percent lower we have not received
[31:33]
revenues in December. METROLift is 20
[31:39]
percent higher. The time the fares
[31:41]
don't tie with ridership as they
[31:42]
recognize various stages independent of
[31:45]
usage. This is a good breakdown of how
[31:46]
we see farebox coming in. Next slide
[31:52]
please all four budgets representing
[31:54]
METRO major appropriated activities are
[31:58]
presented. The first quadrant on the
[32:01]
upper left-hand side shows year-to-date
[32:03]
operating expenditures versus budget,
[32:06]
3.3 percent or $7.4 million under
[32:12]
nonlabor expenses specifically with
[32:15]
contract and support services. The
[32:16]
second quadrant is the capital budget
[32:17]
broken out by two categories, the core
[32:24]
business ended three month period 33
[32:25]
percent or $17 million over. This as
[32:29]
relayed last month in the CFO report
[32:32]
because we are receiving buses sooner
[32:36]
than we expected. 28 of the 45 diesel
[32:38]
commuter buses have been delivered.
[32:41]
Last month it was 15 so it was growing.
[32:46]
25 of the 51 diesel buses have been
[32:50]
delivered. We expect this over run to
[32:51]
iron out in the next two months, it
[32:53]
catches up with the original schedule.
[32:56]
The expansion enhancement category
[33:00]
ended 61 percent or 41 million under,
[33:02]
this is mostly due to timing with the
[33:07]
rays in the referendum projects like
[33:10]
bus stop accessibility. The third
[33:12]
quadrant shows debt service 3.3 percent
[33:15]
or less than 1 million under. Last
[33:21]
month are reported to the board we will
[33:24]
be issuing less debt than expected so
[33:25]
we expect to see and under run in that
[33:28]
category. The fourth quadrant you see
[33:30]
the allocation for general mobility
[33:34]
reflective of sales tax. You see that
[33:35]
through December the amount is under
[33:36]
what we expect to contribute this year
[33:40]
by 1.8 percent or $1 million. Here is a
[33:47]
breakdown of the three major funds as
[33:48]
presented in the investment report. All
[33:49]
of the funds be benchmarks by 10 to 30
[33:55]
basis points our investment officers
[33:56]
are doing a great job. The general fund
[34:03]
balance is down $41 million with prior
[34:07]
month due to outflows required to fund
[34:08]
operating expenditures higher than
[34:11]
inflows sales tax grants farebox and
[34:16]
interest income. Debt service increased
[34:21]
by 6.9 million representing program
[34:22]
monthly contribution to cover interest
[34:23]
and principal payments for debt. The
[34:24]
general mobility fund increased 15
[34:28]
million, this reflects an inflow of
[34:32]
contribution from sales taxes in
[34:37]
December 2018 .2 offset by 2.7 million
[34:38]
of congestion mitigation payments made
[34:42]
to multicity partners. Next slide
[34:46]
please. METRO debt balance remains the
[34:48]
same from last month at 643 million.
[34:53]
The last time METRO debt was below 650
[34:54]
million was 15 years ago in 2011.
[34:57]
However the balance will not stay down
[35:02]
long. Later this month we issue the
[35:03]
first tranche of commercial paper 18
[35:06]
million of referendum projects
[35:09]
[Indiscernible] I'm happy to report the
[35:11]
rating agency SMP is getting set up for
[35:13]
this has given commercial paper the A1
[35:16]
rating the highest rating they can
[35:20]
give. Any questions for George? thank
[35:24]
you for the presentation I have a
[35:29]
couple of questions. What is a typical
[35:33]
or approximate percent of our overall
[35:34]
budget that comes from sales tax and
[35:36]
what is it for farebox for the general
[35:38]
public and for the board
[35:42]
>> We can say sales tax is about 800
[35:45]
million, about 1 billion take out the
[35:47]
general mobility. Farebox right now I
[35:51]
think we have it budgeted at 47
[35:53]
million. You can see the difference
[35:56]
between those. The other inflows that
[36:01]
fund our operations are grants. We have
[36:06]
that 200 million. And we also have
[36:13]
interest and debt proceeds. We expect,
[36:16]
well we are issuing debt, we don't
[36:19]
issue debt unless we need the money.
[36:22]
Our general fund was able to cover
[36:25]
operations in the past years. We have
[36:28]
not issued debt since 2018. So now
[36:33]
moving into this year issuing that
[36:34]
starting a commercial paper program, it
[36:37]
gives us the flexibility to issue debt
[36:40]
when we need it. That is the beauty of
[36:41]
it
[36:46]
>> And then, when do we expect the
[36:47]
general fund balance to bounce back to
[36:49]
305 million the recommended amount we
[36:51]
should have been there to be healthy
[36:56]
>> Our, we have a constraint a reserve
[36:59]
constraint which is 15 percent of
[37:01]
operating budget and another layer is
[37:05]
five percent of the operating budget,
[37:09]
that is a board policy parameter. On
[37:13]
top of that, 15 million. That's over
[37:18]
$223 million. We are never at risk of
[37:25]
not paying our bills. We have over $200
[37:29]
million. But we optimize. So in the
[37:32]
past year, we were 500 million above
[37:36]
that, that's not very good as well
[37:39]
because it's taxpayer money and we need
[37:40]
to deploy those funds for uses. We try
[37:42]
to optimize so we are using the exact
[37:44]
amount and keeping a reserve that keeps
[37:51]
a strong safe resilient, as part of the
[37:52]
reason we have such a high
[37:56]
[Indiscernible] because we do these
[37:57]
things
[37:58]
>> Thank you so much I appreciate that
[38:00]
conversation on a higher level to give
[38:01]
us an understanding of where we are,
[38:03]
where we need to go, if that's
[38:11]
something we need to address so I
[38:12]
appreciate it thank you
[38:13]
>> The one thing I want to add that was
[38:15]
a good question, one of the reasons why
[38:18]
we are healthy is because the majority
[38:19]
of our revenue comes from sales tax
[38:22]
revenue, that's very different from
[38:23]
other transportation agencies across
[38:24]
the US relying on fare revenue. The
[38:28]
other thing is George and his team and
[38:34]
that's why we monitor the forecast for
[38:36]
the sales tax revenue because if we see
[38:37]
it is going to go down, we adjust
[38:43]
expenses as well. Is very important we
[38:47]
look at that because we don't want to
[38:48]
be in a situation where the operating
[38:49]
expenses are more than net revenue
[38:52]
coming in. Any other questions? okay. I
[38:57]
wanted to ask a question about the fare
[39:02]
boxes. May be Tom that would be a
[39:06]
question for you. How are we as far as
[39:07]
putting in the new fare boxes
[39:10]
>> We have an update coming in the
[39:16]
Customer Service Committee. But it's
[39:19]
going extremely well with all the
[39:21]
farebox is being installed, all the
[39:24]
TVMs coming on board they are making
[39:26]
changes as we speak on the platforms.
[39:30]
And we have begun the transition to
[39:35]
utilizing the new system. It's going to
[39:39]
take a little time. We are working
[39:40]
through allowing people plenty of time
[39:42]
to make their transition from the old
[39:45]
system to the new. We are still on
[39:49]
track for full transition come February
[39:50]
and April
[39:52]
>> I'm sorry February and March
[39:58]
>> Okay. How about our transition with
[40:00]
our park and ride folks with the
[40:04]
corporate sponsorships? Need to make
[40:06]
sure there's not [Indiscernible] as well
[40:09]
>> We are taking special care and
[40:12]
making sure the right sponsors that
[40:16]
have utilized the park and ride in
[40:21]
anyway are giving every tool necessary
[40:23]
to make the transition. We double
[40:24]
checked on a few the other day and
[40:28]
everybody is in good shape with no
[40:29]
issues at this point
[40:32]
>> This is probably more of a safety
[40:35]
question but for the safety committee
[40:38]
but once we get the farebox is in place
[40:40]
and we have fare collectors in place
[40:44]
collecting hopefully that will minimize
[40:49]
[Indiscernible] we see
[40:50]
>> Absolutely that is one of the
[40:52]
objectives yes ma'am. Thank you George
[40:55]
for your presentation. Everyone is okay
[40:58]
we will move the financial report to
[41:01]
the board for approval. Hearing no
[41:02]
objections we will move it forward. We
[41:04]
will go to the action item 3 Eddie
[41:08]
Miranda
[41:11]
>> Good morning, I am Allen Clark's
[41:15]
chief strategy officer, I am Eddie's
[41:16]
lesser replacement for the day. He is
[41:20]
out of town. Happy to be able to walk
[41:21]
you through our three items. The first
[41:23]
of those item number three, we are
[41:31]
requesting board approval for the
[41:32]
Interim President CEO to be able to
[41:34]
request our annual transit formula
[41:37]
funds and to speak to that and give you
[41:41]
additional background, I have my deputy
[41:44]
chief strategy officer, Alberto here
[41:48]
this morning. Albert I will turn it to
[41:49]
you
[41:50]
>> Thank you good morning. Let me make
[41:54]
sure the clicker works and it does.
[41:56]
Thank you and good morning. Today we
[42:01]
will the FY25 formula funds for the
[42:05]
FTA, particularly the 5307 5310 5337
[42:14]
and 5339 bus. These funds METRO is the
[42:15]
designated recipient for the funds.
[42:18]
Those funds come into the Houston
[42:20]
urbanized area. I want to pause quick,
[42:23]
designated recipient what does it mean?
[42:30]
it means METRO is responsible for the
[42:31]
funds and act on behalf of the FTA for
[42:34]
the urbanized area. In order to get
[42:35]
these funds program we must develop a
[42:38]
program of projects in coordination
[42:42]
with regional partners. The 5307 funds
[42:43]
came in at 119 million, 5310 5.9
[42:51]
million 5337 22 million and 5339 at 9.8
[42:54]
million for a total of 157 million,
[43:02]
that's roughly 3 percent increase from
[43:03]
the prior year the urbanized area this
[43:04]
is a census designated area. If you
[43:15]
note, the light purple and dark purple
[43:17]
the dark purple is the METRO service
[43:19]
area you see a translucent area to the
[43:24]
northwest. That is METRO service area.
[43:27]
The Houston urbanized area is dark
[43:31]
purple. METRO is not the only one that
[43:32]
operates in the Houston urbanized area.
[43:38]
Harris County Fort Bend County and Gulf
[43:39]
Coast transit District operate in this
[43:45]
area. The program of projects, we work
[43:52]
with our regional partners we have
[43:55]
collaborative efforts and discussions
[43:56]
to discuss the needs of the region and
[43:57]
how funds will be allocated. METRO is
[43:59]
required to approve the pop, required
[44:05]
by the board. All the projects must be
[44:06]
included in the regional transportation
[44:11]
plans. All the projects will be within
[44:12]
the Houston UZA. 5307 funds FTA is
[44:29]
required to program a minimum of 1.75
[44:30]
percent of the formula funds in safety
[44:31]
and security, that is a minimum. Will
[44:33]
talk more on the slide how we maximize
[44:38]
the efforts. Also we are required to
[44:42]
program at least a maximum of 10
[44:43]
percent of funds in ADA paratransit
[44:48]
services. What are 5310 funds, they
[44:55]
support seniors and. Individuals with
[44:56]
disabilities METRO use these for
[44:57]
METROLift services. Something to
[45:00]
highlight, METRO will conduct a call
[45:01]
for projects with our regional partners
[45:06]
and reserve up to 750,000 to do such.
[45:11]
Transportation services will be a
[45:12]
priority of these call for projects. I
[45:15]
have been overseeing this process for
[45:19]
10 years now and have to admit this is
[45:20]
my favorite part of the process, to
[45:23]
work with smaller partner organizations
[45:24]
to get services on the road. 5337 funds
[45:33]
are used as a state of good repair to
[45:34]
maintain fixed guide way high intensity
[45:36]
bus networks. Think of the light rail
[45:42]
and the HOV lanes. 5339 are bus
[45:46]
facilities and bus for capital projects
[45:51]
within Houston UZA to rehabilitate
[45:57]
vehicles and facilities themselves. A
[45:58]
high overview of the allocation in the
[46:03]
Houston UZA. Every single category we
[46:06]
discussed 5307 5337 5309 and 5310 plus
[46:12]
the regional partners, you note that
[46:13]
[Indiscernible] is Gulf Coast transit
[46:15]
District, they also report inside the
[46:17]
urbanized area but in coordination with
[46:21]
them they have a significant balance of
[46:23]
formula funds they are working through
[46:25]
so we discuss with them and they did
[46:29]
not need funds from FY25. Here is the
[46:39]
5307 program of projects for Houston
[46:42]
urbanized area. METRO Harris County and
[46:43]
Fort Bend County are part of this. I'd
[46:46]
like to highlight the safety and
[46:52]
security component $33 million. Earlier
[46:53]
I talked about 1.75 percent that was a
[46:55]
minimum, tapping into what George was
[47:00]
saying, cash is important and the
[47:01]
timing of the cash is also important.
[47:03]
What we did is we worked with regional
[47:08]
FTA, region six and said if it's a
[47:10]
minimum can't we go above and beyond in
[47:14]
the answer was yes. What this does in
[47:15]
working with George's team at finance,
[47:17]
we draw down the funds a lot quicker.
[47:20]
Another thing is the ADA service
[47:22]
support 10 percent maximum amount,
[47:28]
Harris County and Fort Bend County
[47:29]
there projects all of the projects are
[47:31]
very much non-capital-intensive the
[47:34]
meaning they will be reimbursed quickly
[47:35]
and that's what we want for the
[47:40]
urbanized area. 5310 projects will be
[47:44]
part of this, you note that as a
[47:47]
$750,000. This is a program of projects
[47:51]
for the Houston urbanized area, Harris
[47:55]
County for King County receiving funds
[47:59]
as well. The 5337 program of projects,
[48:02]
METRO will retain 100 percent of the
[48:05]
funds as noted before regarding fixed
[48:08]
[Indiscernible] as high intensity bus
[48:13]
METRO being we are the ones that have
[48:14]
the fix guide with the rail and HOV
[48:17]
lanes. These projects will be
[48:19]
implemented for state of good repair
[48:20]
projects for Fannin South and West
[48:26]
Belfort Park and ride. The 5339
[48:27]
program is a regional fare collection
[48:30]
system, this is ongoing and prime to
[48:33]
receive federal funds. The timing of
[48:34]
reimbursement of the funds is positive.
[48:39]
The request for action, it's threefold.
[48:44]
Board approval for the projects for the
[48:47]
FY25 formula funds, permit METRO staff
[48:48]
to issue a call for projects to solicit
[48:52]
partnership proposals up to $750,000.
[48:58]
To provide the interim CEO with
[48:59]
comprehensive authority to implement
[49:01]
the program of projects including
[49:05]
submission of grant applications
[49:07]
conducting administrative actions as
[49:08]
required sub allocating funds for
[49:10]
regional transit providers and
[49:11]
execution of subsequent FTA grant
[49:15]
agreements as always there are
[49:20]
alternatives, the alternative here is
[49:21]
to delay and move forward with the
[49:22]
program of projects at a future date.
[49:28]
Unfortunately it won't change the
[49:29]
amount or time frame to implement a
[49:32]
program of projects. That concludes the
[49:34]
presentation
[49:35]
>> Any questions for Alberta? thank you
[49:42]
Alberto this is board member Ponce. The
[49:45]
request for projects for 5310 could you
[49:50]
give a little more detail as to what
[49:53]
those proposals limits are
[49:54]
>> What the limits are?
[49:58]
>> More of what our, is it open to any
[50:05]
kind of proposal or specifics required
[50:06]
by METRO
[50:07]
>> That's a fantastic question. The
[50:15]
5310 call for projects is limited to
[50:16]
projects that enhance the mobility of
[50:17]
seniors and individuals with
[50:19]
disabilities. It is a requirement that
[50:20]
services be open to the public, there
[50:22]
are other criteria that follow. We do a
[50:26]
fantastic job in advertising this. We
[50:30]
work with our marketing team to get
[50:31]
this out as best we can. We coordinate
[50:35]
with [Indiscernible] I just met with
[50:37]
the director yesterday on how we can
[50:40]
collaborate more. We also emailed
[50:44]
directly all past applicants and
[50:45]
successful applicants to make them
[50:50]
aware of the opportunity, as well as
[50:51]
make presentations at the United Way
[50:52]
and [Indiscernible] on the funds
[50:54]
available. To talk about the projects,
[50:58]
what we've seen in the past is capital
[51:02]
projects operating. The last two years
[51:03]
we have focused on operating projects,
[51:05]
those that get the service on the
[51:08]
streets, that's what we've heard as far
[51:11]
as a resounding soundboard from many
[51:13]
patrons in the region they'd like to
[51:14]
see the service on the street. That's
[51:17]
our main focus for call for projects
[51:19]
>> Thank you
[51:22]
>> Albert if I may, you might want to
[51:26]
mention the kind of organizations we
[51:29]
are working with which tend to be
[51:33]
not-for-profit organizations. Often
[51:34]
transportation is not their primary
[51:36]
function but they are serving part of
[51:38]
our community with significant
[51:44]
disabilities and providing the more
[51:47]
client based customized transportation
[51:51]
for those individuals. Could you
[51:54]
mention a few of those organizations
[51:55]
>> Thank you certainly fantastic
[51:57]
follow-up. I've been overseeing the
[51:58]
funds for 10 years now. I have to admit
[52:00]
it's the favorite part of the process.
[52:04]
I've been out to these agencies and put
[52:05]
the service on the streets. Without
[52:10]
naming names one in particular the
[52:11]
services to help individuals with
[52:16]
intellectual disabilities and training.
[52:18]
They go out with the service and train
[52:19]
individuals to service vending
[52:20]
machines. When they have their product
[52:22]
and their dollies they can't, they have
[52:25]
difficulty getting on our service. So
[52:29]
these funds provide them to help
[52:31]
transport them and do the service. The
[52:34]
service is to get individuals to where
[52:35]
they need to be and perform the
[52:39]
training opportunities to get them
[52:40]
prepared for the real world. Our
[52:43]
services can accommodate the bulk of
[52:45]
the project and the equipment like
[52:49]
dollies. It's instances like this where
[52:51]
you see the funds go in technician
[52:53]
areas and it's a wonderful time saving
[52:58]
>> How are reprioritizing these
[53:03]
proposals? They are prioritized based on
[53:05]
duplication of service, make sure they
[53:07]
are sustainable. There's a lot of
[53:08]
criteria that go into it. I'd be happy
[53:12]
to present these findings at a future
[53:13]
date when we complete the projects and
[53:16]
the board and committee can walk
[53:17]
through how they were selected. I
[53:19]
certainly don't sit on the review
[53:23]
committee, is comprised of regional
[53:27]
partners in the region and H GAC for
[53:28]
independent review of applications
[53:31]
>> Thank you I would love a report on
[53:32]
that
[53:33]
>> Absolutely
[53:34]
>> I have one question, what would you
[53:36]
say is the number of partnerships you
[53:39]
have? How many partners do you have
[53:43]
>> Active partnerships is upwards
[53:47]
between five and 10, meaning we have
[53:48]
fund balances available and working
[53:51]
with the finance team. At any given
[53:52]
time when we do a call for projects in
[53:55]
the past, we received from 1 to 5
[54:00]
applications. Not a lot. Three or four
[54:02]
years ago we revamp the entire process
[54:03]
and said we are not getting enough. We
[54:05]
went out and did the process over again
[54:08]
and got 15 projects applications. It's
[54:13]
a very difficult for the review
[54:14]
committee to select the projects. But
[54:17]
again it's wonderful to see funds go to
[54:18]
these partners
[54:22]
>> Thank you very much and thank you
[54:24]
for the work you are doing
[54:27]
>> Any other questions? thank you
[54:30]
Alberto we appreciate your
[54:35]
presentation. I'm going to go back to
[54:39]
Dominic Maisoc I believe he is on the
[54:41]
phone. Are you there?
[54:44]
>> Terry can you hear me now? Yes we
[54:47]
can hear you
[54:50]
>> Okay. I'm going to mention it here
[54:53]
and maybe I can talk about it later in
[54:55]
other committee meetings coming up. Tom
[55:01]
Jasien, thank you for giving me your
[55:04]
number because I've been texting Tom
[55:09]
about if I see something I text him
[55:10]
immediately he told me to do that. One
[55:13]
day I was on the 96, METRO's from
[55:17]
Memorial going from the transit center,
[55:23]
comes up Fulton Tidwell Parker
[55:28]
Northline Drive up to the transit
[55:34]
center [Indiscernible] in 1960. One day
[55:35]
I got on the bus coming home.
[55:41]
[Indiscernible] 10 people between the
[55:42]
transit center and my house the stop at
[55:47]
my house were on the bus.
[55:54]
[Indiscernible] I was very observant on
[55:58]
bus routes to see how people are
[56:01]
paying. Just out of curiosity. So what
[56:08]
happens was, there were 10 people. Out
[56:12]
of the 10, only two paid fully, one
[56:15]
person paid with a Q Card, I paid with
[56:21]
a beta tested card for the new system.
[56:25]
Eight did not pay at all or fully. Now,
[56:31]
when there is a fare discrepancy I
[56:34]
thought the operator was supposed to
[56:37]
hit a button. On the new fare machines
[56:40]
it sounds like the ding when you go
[56:41]
into a gas station. I'm not hearing it.
[56:46]
With this new system and the new
[56:50]
computers and everything else we can
[56:54]
get very granular where people are not
[57:00]
paying their fares. I know the operator
[57:01]
does not want to get into a hissy fit
[57:02]
with their operators or customers but
[57:06]
not paying full fare is a state felony,
[57:09]
same as not paying full fare on the
[57:15]
light rail lines. So I think one thing
[57:17]
is with this new system we are putting
[57:20]
in, if you don't pay any fare or full
[57:25]
fare it is a state jail felony theft of
[57:30]
fare. The operators are going to have
[57:33]
to get more aggressive and suggest
[57:38]
paying full fare. If they hit these
[57:45]
buttons, Chief Tien can get his people
[57:46]
to ride those buses are routes that
[57:52]
have compliance with officers or fare
[57:55]
inspectors. I don't want this to be
[57:58]
like Dallas. Dallas is having a big
[58:02]
problem with their income people not
[58:06]
paying fares. With that, thank you Tom
[58:08]
for listening to me, thank you for
[58:11]
coming back to me and I send it back to
[58:12]
you thank you
[58:13]
>> Thank you Dominic for your comments.
[58:17]
I'm going to go back to item 3 and make
[58:21]
sure the committees okay to move this
[58:22]
for board approval. Okay great. Moving
[58:25]
on to the next action item
[58:28]
>> Thank you very much. We have two
[58:32]
different grants and George will come,
[58:37]
one of our chief grant writers. The
[58:44]
first concerns the ability to receive a
[58:47]
grant for rifle resistant body armor. I
[58:51]
will let [Indiscernible] explain the
[58:52]
details of that
[58:56]
>> Good morning. I'm requesting board
[58:59]
action to authorize Interim President
[59:00]
and CEO to apply for a rifle resistant
[59:03]
body armor grant funded by the office
[59:04]
of Governor public safety office in the
[59:09]
amount of 280,000. This will outfit 205
[59:12]
police officers with rifle resistant
[59:13]
body armor to protect high caliber
[59:18]
rifle bullets. This does not require a
[59:19]
match
[59:21]
>> Are there any questions? we can move
[59:25]
that onto the board for approval.
[59:32]
>> Item 5 is a little different type of
[59:34]
grant through a similar process. Again
[59:43]
I will let [Indiscernible] speak to that
[59:44]
>> I'm requesting board action to
[59:45]
authorize Interim President and CEO to
[59:46]
apply for the peace officer mental
[59:48]
health program funded by the office of
[59:52]
Governor public safety office in the
[59:53]
amount of 425,000 this funding will
[59:55]
allow the supportive mental health
[1:00:00]
wellness of peace officers that will
[1:00:01]
focus on prevention treatment and
[1:00:02]
resilience
[1:00:08]
>> Any questions? we will move that on
[1:00:09]
for board approval as well. Too good
[1:00:13]
grant programs thank you. The last
[1:00:18]
action item George?
[1:00:19]
>> Thank you again to members of the
[1:00:22]
committee. There is no presentation I
[1:00:23]
will speak to the item. A request for
[1:00:29]
board action for the official board
[1:00:30]
authorization Interim President and CEO
[1:00:35]
to direct a transfer of the
[1:00:36]
administration health and welfare
[1:00:39]
benefits, primarily health insurance
[1:00:40]
for represented employees union
[1:00:44]
employees, from the health and welfare
[1:00:48]
trust to METRO administration. I'm
[1:00:49]
going to go through the history of
[1:00:50]
recent events that brought us here and
[1:00:52]
recap how the administration of health
[1:00:54]
and welfare benefits is currently
[1:00:59]
conducted. With the preface this action
[1:01:03]
is conclusive staff request after
[1:01:06]
year-long review analysis of how the
[1:01:07]
administration of benefits for union
[1:01:10]
employees is conducted and the
[1:01:13]
conclusion is the risk of conducting
[1:01:14]
this benefits administration in the
[1:01:15]
current fashion is too high. The risk
[1:01:23]
that METRO frontline workforce the most
[1:01:24]
important employees in the organization
[1:01:25]
could lose their health insurance is
[1:01:26]
too great to ever happen. Since 2015
[1:01:28]
the threat of the risk has happened
[1:01:34]
twice let's remember all funds
[1:01:36]
supporting the administration of
[1:01:39]
benefits for METRO employees are coming
[1:01:40]
from METRO's taxpayer generated
[1:01:42]
revenues and the hard-earned wages of
[1:01:47]
employees. We have a fiduciary
[1:01:48]
responsibility run our business
[1:01:49]
efficiently. Let's begin with a recap.
[1:01:53]
Both METRO and the transport workers
[1:01:58]
Union provide health insurance benefit
[1:01:59]
to the union represented employees and
[1:02:03]
retirees and beneficiaries through a
[1:02:04]
maintained health and welfare trust.
[1:02:06]
This exists separate from METRO and is
[1:02:10]
operated and managed by a board of four
[1:02:13]
trustees. This trust is funded by
[1:02:15]
contributions from the participants of
[1:02:19]
the trust. This is the union
[1:02:21]
represented employees METRO employees
[1:02:25]
and retirees and contributions from
[1:02:26]
METRO at a rate agreed-upon in the
[1:02:29]
labor agreement. Almost a year ago on
[1:02:35]
January 27, this trust requested METRO
[1:02:36]
to provide additional funding to cover
[1:02:39]
a deficit anticipated to render funding
[1:02:43]
and sufficiency but of 2.4 million. In
[1:02:46]
the event the trust had insufficient
[1:02:48]
funds, that health insurance benefits
[1:02:53]
of the health and welfare trust
[1:02:57]
recipients would end. As you can
[1:02:58]
imagine any emergency room visit event
[1:03:04]
could be financially catastrophic for
[1:03:05]
an uninsured frontline METRO employee.
[1:03:09]
In February the board moved to
[1:03:10]
implement the change control provision
[1:03:11]
in the current labor agreement. This
[1:03:15]
provision enable METRO to replace and
[1:03:20]
appoint trustees of the health and
[1:03:21]
welfare trust in the event certain
[1:03:22]
financial were not being met. Along
[1:03:27]
with the growing deficit and depletion
[1:03:31]
of funds independent audits were not
[1:03:35]
being completed on time major vendors
[1:03:36]
not being properly assessed using the
[1:03:37]
documented bid process. Since February,
[1:03:44]
the health and welfare trust was
[1:03:45]
governed my METRO staff from finance
[1:03:48]
operations and human resources. It had
[1:03:49]
representation from the union president.
[1:03:59]
It was the objective of the newly
[1:04:00]
appointed team of trustees to ensure
[1:04:01]
all decisions and transactions were not
[1:04:02]
being made without METRO consent and
[1:04:03]
approval. During that time the
[1:04:04]
authorized signatories of the bank
[1:04:07]
accounts were renamed METRO have full
[1:04:10]
access to various software and IT
[1:04:11]
systems used to administer benefits.
[1:04:13]
Internal staff resources were used,
[1:04:19]
inventories of vendors invoices and
[1:04:23]
ensure the open enrollment process for
[1:04:24]
the union employees was executed
[1:04:25]
successfully for this year and we were
[1:04:29]
successful with that. Throughout the
[1:04:31]
month and careful oversight is become
[1:04:33]
apparent the current structure and
[1:04:35]
mechanism of administering the union
[1:04:37]
employee benefits through a third-party
[1:04:40]
trust is insufficient and continues to
[1:04:43]
pose risk. There's obvious questions,
[1:04:50]
why have a separate entity controlled
[1:04:51]
by METRO to administer benefits and
[1:04:52]
welfare to METRO employees? Why work
[1:04:58]
through a different set of vendors
[1:05:00]
contractors and procedures to
[1:05:01]
administer benefits to METRO employees?
[1:05:02]
Why pay a separate [Indiscernible]. Is
[1:05:07]
this the most efficient use of taxpayer
[1:05:11]
funds? Is this the most transparent way
[1:05:13]
to administer this benefit to our
[1:05:17]
front-line employees? this request is
[1:05:18]
ultimately coming for a better way, a
[1:05:21]
better way to mitigate the authority
[1:05:23]
risk and to use taxpayer dollars.
[1:05:30]
Again, we are asking for board
[1:05:31]
authorization for the Interim President
[1:05:32]
CEO to direct a transfer of the
[1:05:33]
administration of health and welfare
[1:05:37]
benefits primarily health insurance for
[1:05:41]
represented union employees in the
[1:05:42]
health and welfare trust to METRO
[1:05:44]
administration. I can answer any
[1:05:45]
questions
[1:05:47]
>> Are there any questions? I have one
[1:05:51]
question. What was the original purpose
[1:05:55]
for perhaps having the trust managed in
[1:05:58]
the way it was a managed as opposed to
[1:06:03]
the administration managing it anyway
[1:06:06]
>> It has been historically done this
[1:06:09]
way since close to METRO inception. I
[1:06:13]
think it was part of a negotiation from
[1:06:18]
long ago union agreement that had this
[1:06:19]
is how they wanted to do this. Since
[1:06:23]
then, there has been an issue. In 2015,
[1:06:27]
the trust ran out of money. METRO had
[1:06:32]
to come in like we did last time and
[1:06:36]
bail it out. During that time, that's
[1:06:38]
when we said from here on out, in that
[1:06:43]
agreement we had this appendix D. If
[1:06:48]
this ever happens again where there are
[1:06:49]
financial controls we see as a risk,
[1:06:52]
METRO can appoint the trustees of the
[1:06:54]
board, the appointees of the trustee.
[1:07:01]
>> So in the past few years we have
[1:07:02]
seen two opportunities for there to be
[1:07:07]
a very significant risk. So you are
[1:07:11]
saying to us today that this is
[1:07:12]
probably the best way to go for METRO?
[1:07:15]
>> Yes
[1:07:16]
>> I agree with you
[1:07:17]
>> Any other questions? Thank you for
[1:07:20]
that.
[1:07:24]
>> Has there been ample communication
[1:07:27]
meetings all parties made aware of the
[1:07:30]
transition and action item moving
[1:07:34]
forward
[1:07:35]
>> This is a staff request for the
[1:07:39]
METRO board. All parties, we have
[1:07:43]
positioned it, we have internal
[1:07:49]
meetings if this goes through and is
[1:07:50]
approved we have a plan the plan will
[1:07:51]
be a transition between now and May
[1:07:53]
because in June we will start union
[1:07:57]
negotiations again. We want to have
[1:07:58]
this cleared out and taken care of
[1:07:59]
before we get to that so we have a
[1:08:02]
clean slate to negotiate wages and
[1:08:06]
benefits. This is the first green light
[1:08:07]
we need to begin the transition
[1:08:08]
>> To add to that, the current union
[1:08:15]
leadership is well aware of this
[1:08:19]
proposal and is certainly not opposed
[1:08:24]
>> We've also gone over this before.
[1:08:26]
They also knew this was going to happen
[1:08:30]
with the last injection of cash we had
[1:08:33]
to make. I think this sounds like a
[1:08:35]
good plan. We will move this onto the
[1:08:38]
board unless I hear any objections
[1:08:42]
>> Just want some clarification. Now
[1:08:46]
instead of having the trust for the
[1:08:50]
union employees, union or not now it's
[1:08:56]
under the METRO administration?
[1:08:59]
>> Yes. There are four trustees that
[1:09:01]
govern the third member entity, that
[1:09:06]
administrates the benefits for the
[1:09:08]
union employees. Three of the 4R METRO,
[1:09:12]
all of them are METRO appointees but
[1:09:16]
three our staff. The other appointee on
[1:09:17]
that is the union president who has
[1:09:19]
participated in this whole discussion
[1:09:21]
>> You might add George, that was the
[1:09:24]
change we made last year in how the
[1:09:30]
board was constituted. There's been a
[1:09:32]
few changes, last year when the
[1:09:36]
troubles came we took over the majority
[1:09:39]
of the board.
[1:09:41]
>> Thank you.
[1:09:45]
>> Okay no other questions we will move
[1:09:47]
this to the board for approval. The
[1:09:52]
last item on the agenda is the debt
[1:09:54]
issuance with Sheila Lefang
[1:09:57]
>> Thank you. The manager of debt
[1:10:12]
service and investments. Our group is
[1:10:18]
presenting a debt issuance item
[1:10:19]
contractual obligations for which we
[1:10:20]
will be requesting board approval in
[1:10:21]
the next few months. Can I have the
[1:10:22]
next slide please thank you. The
[1:10:31]
approved fiscal year 2026 budget
[1:10:32]
includes a capital project expenditure
[1:10:34]
plan comprised of referendum projects,
[1:10:38]
bus and infrastructure projects as well.
[1:10:44]
The plan is supported by 441 million
[1:10:47]
in debt funding sources, specifically
[1:10:51]
commercial paper, sales and use tax
[1:10:54]
bonds and contractual obligations. Next
[1:10:58]
slide please. We are now just over
[1:11:00]
three months into the fiscal year. In
[1:11:06]
light of new information, we are
[1:11:09]
updating the fiscal year 2026 capital
[1:11:14]
project financing plan. We intend to
[1:11:15]
issue 124 million less than the
[1:11:20]
original plan. The plan has changed due
[1:11:22]
to a regional forecast of sales tax
[1:11:25]
collections prepared by the University
[1:11:28]
of Houston Center of economic growth
[1:11:31]
and opportunity. George has mentioned
[1:11:38]
that before. This has the effect of
[1:11:41]
reducing METRO anticipated collections
[1:11:43]
by 25 million for the fiscal year. The
[1:11:53]
accompanying economic report noted key
[1:11:55]
reasons for the downward forecast on
[1:11:58]
sales tax collections as the effect of
[1:12:00]
immigration policy on the workforce
[1:12:04]
increased tariffs and economic
[1:12:07]
uncertainty. Because of this refocused
[1:12:13]
and other unexpected events such as
[1:12:14]
government shutdown which occurred in
[1:12:18]
the fiscal year, which in itself
[1:12:19]
affected the timing of grant receipts
[1:12:21]
now delayed to April in a few months, a
[1:12:25]
general fund has diminished
[1:12:28]
significantly as we are having to make
[1:12:32]
payments for qualifying debt to finance
[1:12:37]
capital expenditures such as bus
[1:12:38]
budgets with every day with revenue
[1:12:41]
cash receipts. In this chart the dotted
[1:12:42]
line represents our general fund. The
[1:12:46]
colored areas represent cash reserves
[1:12:51]
which we mentioned earlier which are
[1:12:53]
mandated by either the board policy or
[1:12:56]
the debt policy. As is evident on the
[1:13:00]
chart, we are very close to dipping
[1:13:03]
into reserves. There's a cash infusion
[1:13:07]
is necessary. Currently we are working
[1:13:10]
on getting the two commercial paper
[1:13:13]
lines established and we are well
[1:13:18]
underway with that. So we can begin
[1:13:19]
drawing down to cover these capital
[1:13:21]
expenditures that we have to take care
[1:13:26]
of. This chart highlights our planned
[1:13:27]
response to meet those capital funding
[1:13:30]
requirements and to do so in a timely
[1:13:35]
fashion as well. In our estimate, we
[1:13:38]
would like to start the process now to
[1:13:43]
ensure the funding from the contractual
[1:13:45]
obligations, which will be used as
[1:13:49]
rolling stock becomes available in a
[1:13:52]
couple of months, we are looking at
[1:13:54]
April May timeframe. Next slide please.
[1:14:03]
Does METRO have the authority to issue
[1:14:04]
a contractual obligations which is the
[1:14:06]
debt instruments we are looking to be
[1:14:10]
approved, yes we do. These are
[1:14:13]
authorized in chapter 1371 of the code
[1:14:20]
and subject to subchapter a of the
[1:14:22]
Texas local government code. METRO
[1:14:24]
policy has also established guidelines
[1:14:29]
utilization of the debt instrument to
[1:14:34]
finance capital assets. We also have
[1:14:35]
debt policy stated these can be issued
[1:14:40]
without voter approval and of course we
[1:14:41]
will come to the board to have a
[1:14:46]
resolution adopted to enable us to do
[1:14:55]
so. Next slide please. Just a brief
[1:14:58]
outline of what contractual obligations
[1:14:59]
which are also known as Kos these are
[1:15:05]
debt instruments that presents a legal
[1:15:10]
agreement between two parties, there is
[1:15:12]
no election requirement meaning we
[1:15:13]
don't have to go to the voters to get
[1:15:17]
these in place. They are considered
[1:15:18]
good for nonconstruction projects such
[1:15:22]
as rolling stock. Rolling stock is
[1:15:23]
equipment you use to generate revenue.
[1:15:26]
They are good for a short duration
[1:15:30]
projects, the projects which we use the
[1:15:35]
KO with an average life of 5 to 12
[1:15:39]
years. They will be issued as senior
[1:15:44]
lien obligations, which means we will
[1:15:47]
they are secured by pledged revenues
[1:15:48]
and come from sales tax and they have a
[1:15:50]
strong credit backing, rated AAA either
[1:15:54]
rating agencies standard and pore. Next
[1:16:01]
slide please. The projects we are
[1:16:04]
looking to fund, we will issue
[1:16:06]
approximately 75 million which will
[1:16:09]
include borrowing costs. This will be
[1:16:10]
used to acquire the equipment, the two
[1:16:13]
groups of equipments are rolling stock
[1:16:15]
we are looking to finance, revenue
[1:16:21]
vehicles and also nonrevenue vehicles
[1:16:26]
that support the operations. There's
[1:16:29]
going to be interest related to the
[1:16:31]
contractual obligations and also costs
[1:16:36]
involved in issuing these. These items
[1:16:37]
are already budgeted for in the budget
[1:16:42]
we passed last fall. Next slide please.
[1:16:48]
Our next steps, we will revisit with
[1:16:49]
the committee in the next few months.
[1:16:54]
Then we will be asking the board to
[1:16:55]
specifically approved the issuance of
[1:16:56]
the KOs, approve the amount which will
[1:17:02]
be in the region of about $75 million.
[1:17:04]
We will ask the board to authorize
[1:17:11]
appropriate to execute documents
[1:17:14]
associated with the financing. Also to
[1:17:18]
approve the team which is the attorneys
[1:17:21]
and underwriting syndicates associated
[1:17:22]
with the financing as well. That is the
[1:17:27]
plan we have as far as that is
[1:17:30]
concerned. This concludes my
[1:17:33]
presentation I'm happy to take any
[1:17:34]
questions
[1:17:37]
>> Just for the ignorant what is a KO
[1:17:42]
versus CO. That is interesting that
[1:17:47]
they did not call it a CO that was one
[1:17:48]
of my first questions as well, there is
[1:17:52]
no rhyme or reason. What does Ks
[1:17:58]
stand for, contractual
[1:17:59]
>> I'm okay with CO.
[1:18:03]
>> Any other questions? I wanted to
[1:18:07]
make a couple of comments to make sure
[1:18:13]
we stress that the different debt
[1:18:16]
instruments we issue will be depending
[1:18:18]
on the purpose. If you have a
[1:18:24]
referendum or a non-referendum, the
[1:18:25]
finance team will make sure they use
[1:18:28]
proper debt investment. The other thing
[1:18:29]
I wanted to mention is when we are
[1:18:32]
issuing debt for rolling stock heavy
[1:18:33]
equipment things of that nature that we
[1:18:36]
are going to match payback with the
[1:18:40]
useful life. In other words we don't
[1:18:42]
want to pay back in 10 years when
[1:18:43]
useful life is seven years or five
[1:18:48]
years. Any other questions? Thank you
[1:18:51]
for the briefing. This is the last item
[1:18:54]
on the agenda so the meeting is
[1:18:55]
adjourned
[1:18:59]
>> It is 10:42 AM we will start the
[1:19:05]
infrastructure mobility committee
[1:19:06]
meeting
[1:19:09]
>> Excuse me it is 10:22 AM for the
[1:19:10]
record
[1:19:15]
>> I am Bob Fry the Chairman. I have a
[1:19:21]
quorum present all of the board is here
[1:19:22]
thank you for being here, Chairman
[1:19:23]
Brock thank you for being here. I'm
[1:19:31]
losing one. Okay. We have at least one
[1:19:36]
speaker go ahead
[1:19:37]
>> Dominic Maisoc
[1:19:40]
>> Can you hear me? We hear you find
[1:19:46]
Dominic go ahead. Mayor I was not at
[1:19:48]
the rail meeting yesterday because I
[1:19:53]
was doing my 180 at Council yesterday.
[1:19:57]
As far as I'm concerned concerning
[1:20:01]
that, METRO needs to watch the Union
[1:20:10]
Pacific Northern Southern merger. I
[1:20:11]
think there probably will be statements
[1:20:15]
about the Houston terminal. I think the
[1:20:16]
board needs to be very cautious of
[1:20:19]
that. May be working with the cities
[1:20:21]
and everything to have Union Pacific
[1:20:25]
give the money for grade separation. In
[1:20:30]
this, on the issues putting a downtown
[1:20:38]
METRO police station within one of the
[1:20:39]
downtown management District or Houston
[1:20:40]
first. I'm going to say something, I'm
[1:20:44]
for it, unfortunately it is something
[1:20:46]
we have to have. My concern is people
[1:20:50]
are becoming more and more and more
[1:20:56]
uncivil. I will use the example of the
[1:20:59]
bouncing off the walls cartoon World
[1:21:05]
War II era. It seems like people are
[1:21:06]
becoming more and more crude, becoming
[1:21:11]
more and more uncivil. In the last
[1:21:15]
meeting, people will be beginning to
[1:21:18]
feel like, I don't have to pay my fare.
[1:21:23]
It's a sad situation I don't know how,
[1:21:31]
churches are doing part, maybe need to
[1:21:32]
do more. Reverend that's in your
[1:21:35]
department, that might be something you
[1:21:37]
want to talk to your minister group
[1:21:48]
with the Mayor. Use our ministers to
[1:21:49]
tell people to obey the laws, the just
[1:21:50]
laws that we do have. I don't how to do
[1:21:57]
that. Secondly, you have this thing
[1:21:59]
stand by for pavement repair. I think
[1:22:04]
it's good that we have standby
[1:22:08]
contractors that can come in and do the
[1:22:10]
work, as long as they do the work well
[1:22:15]
and do the work so we get the most bang
[1:22:16]
for the buck. I know we've got in three
[1:22:21]
months I know Terry is left, we've got
[1:22:25]
the budget for believe it or not 2027
[1:22:32]
coming up in April. That process is
[1:22:38]
going on. With that, I have no other
[1:22:39]
comments and will send it back to you
[1:22:40]
Mayor thank you
[1:22:41]
>> Thank you Dominic. Any other
[1:22:46]
speakers? No sir. I will make one
[1:22:47]
correction I said all of the board was
[1:22:49]
here Board member Trevino is not here.
[1:22:53]
With that, we will move on to action
[1:22:57]
items. Casey?
[1:23:01]
>>. Good morning I'm here to request
[1:23:10]
board authorization for Interim
[1:23:12]
President CEO to execute a competitive
[1:23:17]
sealed proposal two-year contract for
[1:23:19]
the asphalt and concrete paving for
[1:23:22]
mobility improvements package three on
[1:23:23]
an as-needed basis with Texas materials
[1:23:28]
group, with a base contract value of
[1:23:35]
$35,989,000. And a 10 percent METRO
[1:23:36]
control to contingency of $3.5 million.
[1:23:43]
Not to exceed amount of $39.5 million.
[1:23:50]
>> If there are any questions I can
[1:23:51]
answer them
[1:23:55]
>> Questions or comments?
[1:23:56]
>> Looks like it's okay, Casey. We will
[1:23:58]
pass this on to the board
[1:24:02]
>> Taylor?
[1:24:06]
>> Good morning. Taylor, we are seeking
[1:24:16]
approval of memorandum of understanding
[1:24:18]
between merits and h Harris for an
[1:24:23]
mixed-use development next to the
[1:24:25]
Burnett transit Center. Last year in
[1:24:27]
June and overview the opportunity and
[1:24:31]
today I will provide an update and talk
[1:24:32]
about the intent of the MOU. Before I
[1:24:35]
start I want to recognize we have our
[1:24:41]
colleagues from the Harris County
[1:24:42]
housing finance Corporation here today,
[1:24:47]
we have [Indiscernible]. With that I
[1:25:00]
will begin. What is the [Indiscernible]
[1:25:04]
development. A project led by the
[1:25:06]
Harris County housing finance
[1:25:07]
Corporation and arm of the county
[1:25:08]
itself focused on promoting affordable
[1:25:11]
housing. They have establish a vision
[1:25:15]
for the project, a walkable mixed-use
[1:25:16]
district with innovative mixed income
[1:25:20]
housing commercial retail and
[1:25:22]
neighborhood services serving the near
[1:25:26]
North Side community as well as
[1:25:27]
opportunities for small business
[1:25:28]
success and high-quality pedestrian and
[1:25:30]
green space. While METRO is not leading
[1:25:36]
the project there is opportunity for
[1:25:37]
ridership benefits and customer
[1:25:38]
experience benefits related to safety
[1:25:40]
and security and additional eyes on the
[1:25:45]
street. This project is located in the
[1:25:49]
near North Side, directly adjacent on
[1:25:50]
the eastern side of Burnett transit
[1:25:53]
Center. 10.7 acres the county owns.
[1:25:55]
They are seeking to partner with more
[1:25:59]
developers to bring the project to
[1:26:05]
fruition. The preliminary site plan UC
[1:26:10]
was developed by the county is subject
[1:26:11]
to change based on negotiations with
[1:26:12]
individual developers. They had broken
[1:26:13]
the site into three tracts, tract one
[1:26:18]
tract two being mixed-use developments
[1:26:21]
with affordable housing and tract
[1:26:23]
three being a shared open space area.
[1:26:30]
As far as timeline tract one further
[1:26:35]
away from the transit center on the
[1:26:36]
eastern side is further along the scope
[1:26:40]
from the county are seeking a minimum
[1:26:41]
of 200 units affordable housing as well
[1:26:44]
15,000 square feet of retail or support
[1:26:49]
services for residents. They issued an
[1:26:53]
RFP last year and talk to a developer
[1:26:54]
last year they are in negotiation
[1:26:58]
process with the developer. They
[1:26:59]
anticipate closing the end of this year
[1:27:00]
and construction lasting two years.
[1:27:04]
Tract two on the western side of the
[1:27:06]
property adjacent to the transit center
[1:27:10]
is somewhat similar with more
[1:27:14]
commercial. It is a minimum of 200 unit
[1:27:18]
affordable multifamily apartment
[1:27:19]
complex with a minimum of 25,000 square
[1:27:20]
feet of ground floor retail. They
[1:27:27]
issued an RFP in the fall and
[1:27:28]
anticipate selecting a developer in
[1:27:32]
February. Similar timeline on the
[1:27:33]
closing at the end of the year as well
[1:27:35]
as construction lasting two years.
[1:27:39]
Those are the two tracts. What is the
[1:27:46]
purpose of the MOU, nonbinding
[1:27:49]
agreement there is no contractual
[1:27:53]
obligation for METRO. It does two
[1:27:54]
things that identifies shared goals
[1:27:59]
with Harris County finance Corporation
[1:28:00]
and outlines roles and
[1:28:02]
responsibilities. On the shared goals
[1:28:04]
both parties want to ensure this is a
[1:28:09]
transit oriented development that
[1:28:11]
encourages ridership, that is the
[1:28:15]
design of it. Also an opportunity for
[1:28:19]
us to explore communities, to
[1:28:21]
facilitate development and activation
[1:28:25]
of METRO property itself. In the short
[1:28:26]
term that could be enhanced pedestrian
[1:28:27]
activity between our side and mayors.
[1:28:29]
It could also be a long-term additional
[1:28:32]
use of the transit center in the form
[1:28:36]
of a joint development. As far as roles
[1:28:40]
and responsibilities, Harris County
[1:28:41]
housing finance Corporation is leading
[1:28:43]
the project, METRO is a support role
[1:28:48]
providing information and feedback to
[1:28:49]
the county and their developers related
[1:28:52]
to design and we are having an open
[1:28:56]
mind if interest does come for
[1:28:58]
additional development at the property.
[1:29:02]
With that being said we are here today
[1:29:07]
to request board authorization for the
[1:29:08]
Interim President CEO to approve and
[1:29:15]
MOU with the Harris County housing
[1:29:16]
finance Corporation regarding proposed
[1:29:17]
development adjacent to the Burnett
[1:29:18]
transit Center.
[1:29:21]
>> Questions or comments?
[1:29:26]
>> I don't have any questions but I'm
[1:29:29]
in support of this and excited about
[1:29:33]
the TOD and the support we can provide
[1:29:35]
for METRO
[1:29:36]
>> That was one thing I wanted to ask
[1:29:37]
you. You are okay with Harris County?
[1:29:41]
Okay. The other thing is these projects
[1:29:47]
like this next to our transit assets
[1:29:50]
lead me to ask the obvious question.
[1:29:54]
Chief, are you aware of this do you
[1:29:59]
have public safety concerns as this
[1:30:00]
goes forward?
[1:30:03]
>> Yesterday they looped me in it is
[1:30:09]
expanding and it's going to be more
[1:30:10]
people there so will be a higher
[1:30:13]
[Indiscernible] but a good thing right
[1:30:15]
now it's close proximity to the
[1:30:18]
headquarters at Buffalo Bayou so we
[1:30:21]
still have a gap. As we increase our
[1:30:24]
presence our safety initiative on the
[1:30:27]
red line it will mitigate some of that
[1:30:28]
in the initial term
[1:30:32]
>> Tom, I would be sure to mention that
[1:30:39]
public safety [Indiscernible] as it
[1:30:42]
goes along so they are not caught by
[1:30:43]
surprise later
[1:30:44]
>> Yes, sir.
[1:30:46]
>> Are there any other questions or
[1:30:49]
comments? Kathy
[1:30:52]
>> I'm wondering, this is for
[1:30:55]
increasing the ridership. The goal is
[1:30:57]
to increase ridership. Are there any
[1:31:00]
other things? It looks like we have
[1:31:03]
mixed-use on the businesses. Is this a
[1:31:04]
little like an investment for METRO so
[1:31:07]
we can profit from this or just for the
[1:31:13]
purpose of increasing the ridership
[1:31:16]
>> On our side it's about increasing
[1:31:19]
ridership. The county is developing the
[1:31:23]
property. They have their own goals
[1:31:24]
related to affordable housing but ours
[1:31:27]
is ridership.
[1:31:28]
>> Thank you
[1:31:30]
>> I would ask this question, you talk
[1:31:33]
about the development and the proximity
[1:31:36]
of the transit center next to it. What
[1:31:43]
specifically bridges the two entities
[1:31:47]
together to provide or to enhance
[1:31:52]
transportation?
[1:31:53]
>> That's what the MOU is serving right
[1:31:54]
now or will serve. So we can have
[1:31:58]
further conversation related to the
[1:32:00]
design of the project. We want to make
[1:32:02]
sure cents the design is integrated and
[1:32:09]
supports transit and is a safe and
[1:32:10]
secure environment
[1:32:11]
>> My second question would be, are
[1:32:18]
there any future developments this
[1:32:19]
entity wants to partner with or have a
[1:32:22]
relationship with METRO in?
[1:32:27]
>> Not right now but we are open to
[1:32:28]
conversations
[1:32:29]
>> Thank you
[1:32:34]
>> Anything else?
[1:32:35]
>> Go ahead
[1:32:39]
>> Director Ponce, I have not been out
[1:32:40]
to the Burnett transit Center for some
[1:32:42]
time now. With this development and the
[1:32:50]
increase of parking for residents and
[1:32:53]
customers as well as people coming to
[1:32:56]
shop, could you speak a little on what
[1:32:59]
the parking situation will be like? Are
[1:33:04]
there multilevel parking garages that
[1:33:05]
will be utilized for by both riders and
[1:33:10]
residents?
[1:33:14]
>> At this time, it's a separate
[1:33:15]
development so there is not shared
[1:33:18]
parking. They would have their own
[1:33:19]
parking for residents and for retail
[1:33:25]
and the transit center would stay as is
[1:33:29]
>> I think you can see the interest in
[1:33:31]
it. Everybody here has spoke, it's best
[1:33:33]
to keep the board informed of how it's
[1:33:39]
going. Personally, anytime you are
[1:33:41]
talking this it's better when you're
[1:33:44]
not talking to somebody, I certainly
[1:33:45]
think we need to move this forward. We
[1:33:51]
will move it forward. Thank you
[1:33:52]
>> We will move on to five year
[1:34:03]
contract on paving. Parmjit Kang, have
[1:34:07]
not seen you in a while
[1:34:13]
>> I am the senior program manager with
[1:34:17]
infrastructure improvement here to
[1:34:18]
request board authorization for Interim
[1:34:20]
President CEO to negotiate and execute
[1:34:23]
five year contract with two one-year
[1:34:28]
options with 5 million each with AECOM
[1:34:38]
Midtown Engineer Consor Engineers HR
[1:34:45]
Green BGE Infratech and Exp US Services
[1:34:51]
for design services for budget and
[1:34:52]
plan construction projects on as-needed
[1:34:53]
basis for not to exceed 140 million
[1:34:59]
total
[1:35:02]
>> Questions?
[1:35:06]
>> Basically this is to put us in line
[1:35:09]
with consultants as we need them when
[1:35:11]
we need them, we pay for them when we
[1:35:15]
use them. It's to be ready when things
[1:35:18]
come up if we need additional help,
[1:35:21]
does that cover it?
[1:35:22]
>> Yes
[1:35:26]
>> Is there any specific set-aside for
[1:35:29]
small businesses in this consulting?
[1:35:34]
Yes. 35 percent [Indiscernible]
[1:35:38]
>> Any other questions? If I could just
[1:35:43]
add a little bit, each one of those
[1:35:46]
vendors has committed to 35 percent or
[1:35:50]
greater, some of them [Indiscernible]
[1:35:53]
>> On page 27 they are listed.
[1:35:59]
>> That's a good point. Is it cut and
[1:36:05]
dry as far as you are concerned? Okay
[1:36:09]
no further questions we will move this
[1:36:11]
onto the board. Thank you
[1:36:14]
>> Clint, are you ready?
[1:36:28]
>> Welcome Clint good to see you. Good
[1:36:36]
morning sorry I did not hear my name.
[1:36:38]
This morning we are here to request
[1:36:43]
board action, the METRO Police
[1:36:47]
Department and leadership identified a
[1:36:49]
need for METRO police substation near
[1:36:51]
the convention District area adjacent
[1:36:53]
to both our green and purple line as
[1:36:59]
well as the airport direct service. As
[1:37:05]
such, the agency has begun discussions
[1:37:06]
and developed a draft agreement with
[1:37:12]
the Houston first Corporation to
[1:37:17]
procure a ground-floor space of 1400
[1:37:18]
square feet of the partnership tower at
[1:37:24]
71001 [Indiscernible] in Houston Texas.
[1:37:27]
I will read the recommendation. Request
[1:37:30]
board action for the Interim President
[1:37:34]
CEO to negotiate execute and deliver a
[1:37:37]
lease agreement with Houston first
[1:37:39]
Corporation for the ground-floor 1400
[1:37:41]
square feet of the partnership tower at
[1:37:47]
701 [Indiscernible] in Houston Texas
[1:37:49]
for Houston METRO police department
[1:37:55]
substation. As a note, this is a zero
[1:37:59]
cost a lease arrangement and does
[1:38:02]
include both option for a renewal, this
[1:38:08]
is a one-year agreement now and has the
[1:38:09]
option for termination at either party
[1:38:10]
request.
[1:38:15]
>> Are there any questions? I have a
[1:38:19]
comment. I believe because of its
[1:38:23]
location I believe ridership and the
[1:38:24]
public will be pleased with this move
[1:38:33]
>> Also in support given the upcoming
[1:38:36]
increased activity in the next six
[1:38:37]
months I'm glad to see this on the
[1:38:38]
agenda
[1:38:40]
>> I echo all of the above, it's a
[1:38:42]
great idea
[1:38:45]
>> You might want to go into why the
[1:38:49]
location is so important?
[1:38:52]
>> There's a number of reasons, this is
[1:38:54]
the confluence of the two lines, we
[1:38:57]
have both the green and purple line
[1:38:59]
that connect to the convention center.
[1:39:06]
The Houston airport direct service that
[1:39:07]
runs every 30 minutes and delivers
[1:39:09]
folks from the airport to downtown
[1:39:10]
Houston is at this location as well. It
[1:39:16]
gives the METRO MPD the opportunity to
[1:39:17]
observe the activity occurring as it
[1:39:19]
relates to passenger service and
[1:39:23]
additional safety. Provides extra layer
[1:39:24]
of general safety for the area at the
[1:39:27]
convention center
[1:39:30]
>> I think it's a good location, it
[1:39:33]
should be done any other comments? We
[1:39:37]
will pass it on, Clint thank you.
[1:39:49]
>> Bridget Towns, hello
[1:39:54]
>> Good morning everyone. I am Bridget
[1:40:04]
towns, vice president of infrastructure
[1:40:08]
improvement department here to request
[1:40:13]
authorization for the president Interim
[1:40:14]
President CEO to execute a contract
[1:40:15]
modification with Wilson building
[1:40:16]
services for the installation of a fire
[1:40:21]
pump and generator at METRO central
[1:40:25]
store warehouse. The original contract
[1:40:26]
was awarded earlier last year in the
[1:40:35]
amount of $1.928 million. Also at the
[1:40:41]
time, METRO controlled contingency was
[1:40:45]
approved in the amount of $192,818. The
[1:40:53]
total amount of the original contract
[1:40:59]
including the controlled contingency
[1:41:05]
was $2.120 million. We had an earlier
[1:41:06]
change order in the amount of $80,875.
[1:41:15]
Which left us with the remaining
[1:41:22]
controlled contingency of $111,942.
[1:41:27]
This change order is for 197,057. The
[1:41:36]
additional amount requested to cover
[1:41:40]
this current change order is the delta
[1:41:43]
between the change order amount and the
[1:41:49]
remaining controlled contingency, which
[1:41:56]
is $85,114. The total modified contract
[1:41:59]
amount, including the change order,
[1:42:05]
would be $2.206 million. Also as part
[1:42:12]
of the change order, we would like to
[1:42:15]
request a period performance extension
[1:42:18]
to July of this year, this change order
[1:42:28]
captures field driven revisions for
[1:42:29]
unforeseen site conditions and code
[1:42:35]
requirement including but not limited
[1:42:38]
to adjusting conduit qualities
[1:42:42]
increasing casing sides upsizing the
[1:42:45]
tapping sleeve and valve and modified
[1:42:48]
electrical components to meet the
[1:42:51]
latest city codes. Are there any
[1:42:55]
questions or comments? I know it is a
[1:42:56]
lot of numbers
[1:42:59]
>> Go ahead
[1:43:01]
>> So this is for this location at 1900
[1:43:05]
Main?
[1:43:06]
>> This is for the METRO central store
[1:43:09]
warehouse.
[1:43:11]
>> Okay.
[1:43:14]
>> I want to comment on this one. This
[1:43:18]
warehouse is been a METRO hands for how
[1:43:21]
long Tom? Since the 60s or 70s?
[1:43:24]
>> Certainly back to the original
[1:43:28]
origin which goes back to 1979. And we
[1:43:31]
know it was before that. It has fallen
[1:43:38]
into disrepair anytime you have a
[1:43:39]
building that old anything you do cost
[1:43:43]
a lot of money. The state of good
[1:43:44]
repairs is what we demand on this board
[1:43:45]
so this is certainly worth doing and I
[1:43:49]
think we pass this unless I have
[1:43:54]
dissension here. Comments?
[1:43:58]
>> I'm in support of making sure we
[1:44:03]
maintain our facilities. In a state of
[1:44:07]
good repair. I don't know what the
[1:44:09]
expected lifecycle is on the fire
[1:44:11]
suppression system. It looks like we
[1:44:15]
are making modifications upgrades if
[1:44:16]
you have to replace and all of that. I
[1:44:18]
did not know how much life we have
[1:44:21]
current or how much extended life as a
[1:44:22]
result of the repairs? Does anybody
[1:44:25]
know?
[1:44:29]
>> This is just for the fire
[1:44:32]
suppression system. I would say
[1:44:33]
probably off the top of my head, this
[1:44:38]
would send it out for approximately 15
[1:44:39]
years or so
[1:44:41]
>> I guess and that's a good question,
[1:44:46]
of course the caveat is let's start
[1:44:49]
planning for 15 years from now.
[1:44:56]
Anything else? we will pass it along
[1:44:57]
thank you
[1:45:00]
>> Thank you. We will move on to
[1:45:03]
briefings capital project update Shri
[1:45:07]
>> Good morning board members, we've
[1:45:13]
got update starting with Tim Mills with
[1:45:14]
an update on the universal
[1:45:17]
accessibility program.
[1:45:19]
>> Good morning everybody. We will
[1:45:22]
start with the progress update for this
[1:45:25]
fiscal year. December bit of a slow
[1:45:29]
month with the holidays. We are still
[1:45:33]
tracking for 250 improvements in design
[1:45:37]
and construction, I expect to see a
[1:45:41]
good jump in January. Board member
[1:45:43]
Ponce, you asked last month about some
[1:45:46]
of the more difficult stops getting
[1:45:49]
into the open ditch stops and the
[1:45:56]
partnership stops so I wanted to give
[1:45:57]
an update on where we stand in the
[1:45:58]
program and highlight some of the ways
[1:46:01]
we are trying to address those stops.
[1:46:06]
We are at 6100 improvements since the
[1:46:09]
start of the program and F FY18.
[1:46:15]
Everything in red are stops that have
[1:46:16]
not been addressed as part of the UA.
[1:46:17]
When you break that down there are
[1:46:20]
stops in their existing compliant, some
[1:46:24]
completed prior to the start of the UA
[1:46:27]
program. Stops completed by others.
[1:46:29]
Stops completed by a third-party. That
[1:46:34]
leaves about 700 stops left to do, we
[1:46:39]
have another 230 or so currently in
[1:46:43]
construction. Right at about 1000 stops
[1:46:48]
remaining. The green boxes around a
[1:46:52]
couple of corridors, with these
[1:46:55]
partnership stops is how we need to
[1:46:56]
look at them and get away from the
[1:46:59]
point-to-point improvements and look at
[1:47:00]
it as a corridor based approach. To
[1:47:02]
walk you through a few things. This one
[1:47:06]
is on the northeast side of town,
[1:47:12]
Eastland Street. Is a residential
[1:47:14]
neighborhood with existing sidewalk on
[1:47:15]
one side of the street. We operate bus
[1:47:18]
service on both sides of the street.
[1:47:21]
You can see on the left-hand side of
[1:47:25]
the photo, there is an open ditch with
[1:47:28]
a bus stop sign. A ditch on the
[1:47:29]
right-hand side of the street with
[1:47:33]
sidewalk behind it. It's a residential
[1:47:38]
neighborhood, highlighted in the red
[1:47:39]
box we have a school in the bottom
[1:47:40]
right corner of the map and a parking
[1:47:42]
community center in the middle off to
[1:47:47]
the right of Eastland. This is one we
[1:47:53]
are looking at improvements, there was
[1:47:54]
a lot of benefit to the community to
[1:47:55]
look at this as a corridor. I believe
[1:47:57]
from Booker Street to Berry, close
[1:48:01]
to 30 stops off of Wayside over to
[1:48:04]
Eastland and back out to Wayside where
[1:48:13]
we can catch a lot of bus stop
[1:48:14]
improvements and improve the sidewalk
[1:48:15]
in the neighborhood and include
[1:48:16]
sidewalk connections to the school and
[1:48:17]
to the community center in the park.
[1:48:21]
That's one we are tackling ourselves
[1:48:23]
under the UA program, benefits to the
[1:48:28]
community. We are high on this one
[1:48:29]
which is why we chose to advance this
[1:48:33]
ourselves. Oats Road is another one, a
[1:48:43]
little east of Eastland on the east
[1:48:44]
side of town this is a two lane road
[1:48:45]
with deep ditches on both side of the
[1:48:46]
road, about a dozen stops on this
[1:48:52]
stretch of oats Road. Almost all of
[1:48:53]
them have very low zero ridership,
[1:48:58]
there are two stops, a halfway house on
[1:48:59]
the north end of the street where there
[1:49:04]
is high ridership. We are including
[1:49:09]
improvements there to address the ones
[1:49:13]
with highest ridership and then we will
[1:49:14]
work with the service planning group to
[1:49:17]
figure out maybe we can optimize some
[1:49:18]
of the stops and get rid of stops to
[1:49:20]
cut down on the improvements but
[1:49:26]
maintain service while still serving
[1:49:27]
the customer base out there. Veterans
[1:49:31]
Memorial on the west side of town, this
[1:49:37]
is one multilane Road open ditch no
[1:49:43]
sidewalks on either side. We've been in
[1:49:44]
contact with the county they have a
[1:49:48]
sidewalk project coming up so we are
[1:49:49]
coordinating on bus stops making sure
[1:49:52]
they get included in their project and
[1:49:53]
addressing them as part of that that
[1:49:55]
meets the standard and locations are
[1:49:59]
good. That's a case of coordination
[1:50:02]
between agencies. Same thing on
[1:50:07]
[Indiscernible] Road, TxDOT has a
[1:50:08]
project coming up open ditch on both
[1:50:09]
sides of the road. There is a train
[1:50:14]
track on the left side of the photo,
[1:50:18]
coordinating with TxDOT to get stops
[1:50:22]
addressed to our standards. There were
[1:50:23]
a few that presented problems for
[1:50:24]
TxDOT, four of them that we have to
[1:50:28]
figure out how to address those. But it
[1:50:33]
knocks out 15 difficult stops for us
[1:50:36]
that will be done as part of their
[1:50:42]
project. The last one, this is a few
[1:50:44]
different streets up on the northwest
[1:50:49]
side of town. This was not done in
[1:50:50]
conjunction but this is a way it will
[1:50:53]
improve our numbers. When they came
[1:50:58]
with the service change, I believe in
[1:50:59]
November or December board meeting,
[1:51:02]
Route 64 will be discontinued next
[1:51:05]
month. We had several stops on that
[1:51:07]
part of the route that were residential
[1:51:09]
neighborhood, open ditches with no
[1:51:13]
sidewalk, eliminating that stop will
[1:51:14]
take those off the UA list two
[1:51:18]
completed to improve our compliance
[1:51:21]
numbers. Again you can see there are
[1:51:25]
multiple ways we are trying to address
[1:51:28]
the stops, not all necessarily out of
[1:51:33]
the UA budget. But it does show you the
[1:51:34]
flavor of how we are trying to address
[1:51:37]
these difficult stops. Are there any
[1:51:42]
questions?
[1:51:43]
>> I want to go back to oats Road. You
[1:51:48]
were talking to planning within METRO
[1:51:52]
and come up with roads that don't need
[1:51:54]
stops, and it helps the coordination
[1:51:56]
there, I'd like very much
[1:52:02]
[Indiscernible] and with the
[1:52:03]
coordination especially with two groups
[1:52:05]
in house talking, a lot of times that
[1:52:06]
does not happen so I'm proud of you.
[1:52:08]
Are there any comments? Director Ponce.
[1:52:12]
I want to thank you Tim for the update.
[1:52:17]
I remember going out to one of the open
[1:52:20]
houses, the public meeting for
[1:52:23]
Commissioner Garcia by Veterans
[1:52:28]
Memorial. I remember them talking about
[1:52:29]
the expansion of Veterans Memorial
[1:52:31]
there. This is another example of how
[1:52:34]
we can collaborate with other partners
[1:52:38]
to ensure not just our streets and
[1:52:40]
sidewalks but METRO stops are up to
[1:52:44]
date and accessible for everyone. This
[1:52:46]
is one way of us to show other
[1:52:57]
commission offices and also the nation
[1:52:58]
as to what we are doing in Houston in
[1:53:02]
collaboration to ensure all of our
[1:53:03]
spaces are accessible to everyone.
[1:53:05]
Thank you for that I appreciate that
[1:53:08]
>> Also want to applaud the
[1:53:12]
collaborative work as well. When you
[1:53:15]
show the pictures of Veterans Memorial
[1:53:19]
and Alameda Road you know how fast cars
[1:53:21]
go up and down those heavily transited
[1:53:24]
parts of the city. I'm very excited we
[1:53:28]
will be doing work to make it more ADA
[1:53:32]
accessible and also taking into
[1:53:34]
consideration additional safety
[1:53:35]
measures and those area. It is scary.
[1:53:38]
We know Houston unfortunately has some
[1:53:43]
parts like on Westheimer and parts of
[1:53:44]
the city that are dangerous for
[1:53:46]
pedestrians a national report recently
[1:53:49]
said so. I know we are putting safety
[1:53:51]
first and all things we do at METRO. I
[1:53:55]
appreciate the work that we continue to
[1:54:00]
visit busy and fast roads. It's great
[1:54:05]
that we offer the service and hopefully
[1:54:06]
we can make it safer
[1:54:08]
>> And to piggyback off the one on oats
[1:54:12]
Road, we are include flashing beacons a
[1:54:17]
pedestrian crossing because these are
[1:54:18]
two heavily utilized stops coming and
[1:54:19]
going and a lot of traffic out there.
[1:54:23]
Anything we can do to improve the
[1:54:25]
safety crossing the street, getting
[1:54:28]
between stops is something we are
[1:54:29]
looking at as part of the UA program
[1:54:32]
>> I echo the comments. What is the
[1:54:36]
timeline for completion
[1:54:39]
>> Oats Road, this one will go into
[1:54:41]
construction I would guess in the next
[1:54:48]
couple of months. Eastland, we are at
[1:54:50]
the finish line I expect to have
[1:54:51]
permitted planned for those maybe next
[1:54:55]
week. That would again get going this
[1:54:57]
fiscal year. Some of the coordination
[1:55:01]
projects, I need to check in and see
[1:55:02]
where they are on their timeline. Those
[1:55:04]
are outside of our control but I can
[1:55:08]
come back with an update with TxDOT in
[1:55:14]
County projects
[1:55:15]
>> I'd love to hear about the timeline
[1:55:18]
from when we start to when we complete.
[1:55:21]
Also some before and after photos would
[1:55:24]
be great. Is really important, I echo
[1:55:27]
what the other board members have said.
[1:55:31]
Also, us being able to talk about all
[1:55:35]
of these projects underway and the
[1:55:38]
coordination and how we are
[1:55:42]
complementing each other and working
[1:55:43]
together not just in silos. To be able
[1:55:47]
to promote that and tell the story that
[1:55:52]
these investments and projects are
[1:55:55]
underway and people will start seeing
[1:56:00]
that progress.
[1:56:06]
>> Anybody else? okay, Tim this is good
[1:56:07]
staff work and you presented it well
[1:56:10]
thank you. We will move on, Kenneth
[1:56:16]
>> Good morning Mr. Brown.
[1:56:23]
>> Good morning board Ken Brown
[1:56:27]
director of service enhancements to
[1:56:28]
provide the bus shelter program updates
[1:56:30]
for January. Bus shelter program goals
[1:56:32]
are listed, install 2000 new shelters,
[1:56:38]
install 425 BOOST shelters and continue
[1:56:42]
the rehabilitation program. Starting
[1:56:44]
with the BOOST shelters at the time of
[1:56:45]
the presentation creation we reach 235
[1:56:50]
shelter installations, we have four
[1:56:51]
shelter types at our disposal, we have
[1:56:59]
installed 156 cantilever, 68
[1:57:00]
[Indiscernible] so we are well on our
[1:57:01]
way to reaching the goal of 100 for
[1:57:05]
fiscal year 26, we intend to reach that
[1:57:06]
goal prior to the completion of the
[1:57:12]
fiscal year. Moving on to the new
[1:57:13]
standard shelter program, our goal for
[1:57:17]
the year is 500 shelters installed,
[1:57:21]
1500 in total. Our current progress was
[1:57:27]
1150 shelters. We have reached the 1200
[1:57:28]
Mark so we are higher, well on track to
[1:57:34]
reach our goal of 1500 by the close of
[1:57:40]
the fiscal year. In addition we are
[1:57:43]
focusing on transitioning our shelters
[1:57:47]
from the current model to a model that
[1:57:51]
accommodates airflow. Materials have
[1:57:53]
been purchased by facilities
[1:57:54]
maintenance to make the modification to
[1:57:57]
the rehabs. We are looking at making
[1:57:58]
changes to the new standard as well. We
[1:58:04]
have 800 or so to install so we want to
[1:58:05]
make sure we provide the same
[1:58:06]
modification to though shelters as well
[1:58:08]
so all customers can benefit from the
[1:58:09]
change when the summer comes. Speaking
[1:58:16]
of the rehab, we are currently in
[1:58:17]
process of making that conversion. Once
[1:58:19]
the materials are prepared and ready to
[1:58:22]
go, you will see the rehabs shelters
[1:58:30]
include the mesh panels. Last but not
[1:58:33]
least is our partnership, we have a
[1:58:40]
partnership with precinct two. We reach
[1:58:42]
the goal of installation for them we
[1:58:43]
were one short in December but I was
[1:58:44]
recently notified the last shelter was
[1:58:45]
installed. All 200 have been installed
[1:58:48]
we are currently working to get the
[1:58:53]
branding finalized so we can finish out
[1:58:54]
the process and move on to forthcoming
[1:58:56]
agreements. We are working with
[1:59:00]
Precinct 4. We don't have a formal
[1:59:01]
agreement in place because they are
[1:59:04]
finalizing the design. Once they
[1:59:05]
finalize the design we are able to
[1:59:06]
review it and we will talk with them
[1:59:10]
about a potential agreement. That
[1:59:11]
concludes my presentation
[1:59:14]
>> Questions? Just a comment on
[1:59:21]
Precinct 4 partnership, I know they are
[1:59:25]
working on finalizing the design and I
[1:59:26]
look forward to partnering with them to
[1:59:27]
get these on the ground
[1:59:28]
>> Thank you
[1:59:32]
>> Other questions? what is your
[1:59:35]
timeline for having me air panels
[1:59:39]
installed?
[1:59:40]
>> We are a lot closer with the rehab
[1:59:45]
because we have procured the materials
[1:59:46]
800 panels purchased by the field
[1:59:51]
service center. With a new standard
[1:59:57]
shelters we are working on a
[1:59:58]
modification to the agreement because
[1:59:59]
it will require additional resources
[2:00:02]
transitioning from polycarbonate panel
[2:00:03]
which is cheaper than mesh aluminum
[2:00:04]
they will be more durable. I'd say in a
[2:00:07]
month or so we should have that
[2:00:10]
agreement modified and the vendor will
[2:00:13]
go out and purchase the panels and
[2:00:17]
start installing them. It won't start
[2:00:18]
our progress with installing shelters,
[2:00:21]
they will continue to do what they are
[2:00:22]
doing now to get more shelters
[2:00:25]
fabricated. Once we get the new
[2:00:28]
materials we will transition. A month
[2:00:29]
or two we should be looking at shelters
[2:00:31]
>> A month or two to get shelters ready
[2:00:34]
to go, what is the timeline for
[2:00:35]
finishing
[2:00:36]
>> The entire program? we look we are a
[2:00:42]
year ahead of schedule, initially we
[2:00:44]
thought it would be let me go back to
[2:00:50]
the slide, initially we thought we
[2:00:51]
would be getting this done in 2008. We
[2:00:55]
think will we will be finished by 2027
[2:01:01]
>> Okay. 2027. Let's see, okay that
[2:01:04]
does it for me thank you anybody else?
[2:01:06]
I have another quick comment. I know it
[2:01:13]
was a year or two ago we said we wanted
[2:01:14]
to prioritize this as a board and I
[2:01:17]
want to credit the administration for
[2:01:22]
the responsiveness. I really appreciate
[2:01:24]
the updates and I'm excited about
[2:01:25]
continuing to see progress on this
[2:01:26]
initiative
[2:01:27]
>> Anything else? Thank you.
[2:01:36]
Construction update Bilal
[2:01:39]
>> Good morning everyone. Director of
[2:01:49]
construction. I will go over the
[2:01:51]
construction updates. Our construction
[2:01:54]
volume right now is 197.5 million
[2:02:01]
dollars. Additional funds are available
[2:02:04]
for 14.7 million to cover contingency
[2:02:08]
for unforeseen conditions. For a total
[2:02:09]
of 14 projects we are overseeing right
[2:02:11]
now. The update for the maintenance of
[2:02:15]
way project. The project is 65 percent
[2:02:18]
complete, we are on target for July
[2:02:22]
completion with the current pace of
[2:02:25]
work we might achieve substantial
[2:02:26]
completion a month earlier in June of
[2:02:30]
this year. Exterior and interior work
[2:02:34]
are ongoing. The MOW road work has
[2:02:38]
commenced. The roadwork contractor has
[2:02:39]
mobilized to the site last week. Next
[2:02:45]
is the petroleum storage tank
[2:02:50]
replacement that Hiram Clarke. I'm
[2:02:51]
happy to report that both projects have
[2:02:53]
been completed and handed to
[2:02:56]
operations. The new fueling stations
[2:03:00]
are operational. Also next month we
[2:03:04]
will be breaking ground for the new
[2:03:05]
petroleum storage tanks at Kashmere and
[2:03:11]
Northwest bus operating facilities.
[2:03:12]
Next is the TMC electric box
[2:03:14]
infrastructure. This has been completed
[2:03:20]
fencing around the [Indiscernible] have
[2:03:22]
been removed allowing for the bus lanes
[2:03:23]
to back into a normal operation.
[2:03:27]
However we have hit a snag and cannot
[2:03:28]
complete the testing of the Chargers at
[2:03:33]
this time there was a water leak found
[2:03:36]
in the vendor grass which is some of
[2:03:38]
the electrical components.
[2:03:39]
[Indiscernible] is in the process of
[2:03:44]
ordering new parts. We don't have a
[2:03:45]
date yet for when the parts are arriving
[2:03:50]
which may cost some delay starting the
[2:03:51]
electric bus service at this facility.
[2:03:55]
Next we have the TMC elevators and
[2:04:00]
escalators. I'm happy to report the
[2:04:02]
major milestone has been achieved and
[2:04:03]
all four new escalators are installed.
[2:04:05]
These were shipped from Spain and we
[2:04:08]
had to airfreight them to meet the
[2:04:12]
schedule. Also the four new elevators
[2:04:13]
are being delivered to the site this
[2:04:16]
week. Installation will commence in
[2:04:20]
parallel. All of the electrical and
[2:04:24]
mechanical works are ongoing. We are
[2:04:25]
getting ready to start the pedestrian
[2:04:27]
bridge rehab which will start next
[2:04:29]
month and include structure repair
[2:04:33]
paint TMC signs and LED lights. That
[2:04:40]
concludes my presentation before he
[2:04:41]
bring Casey for the pavement projects
[2:04:42]
any questions for me?
[2:04:43]
>> Questions?
[2:04:49]
>> Go back to the Chargers. Those are
[2:04:53]
for the electric buses? How does that
[2:05:03]
slow you down? it doesn't hurt you bad
[2:05:06]
does it? All of the infrastructure has
[2:05:09]
been installed the Chargers the
[2:05:11]
switchgear the transformers. In order
[2:05:13]
to start the testing and commissioning,
[2:05:15]
the system had to be turned on. When
[2:05:21]
they were about to turn it on they
[2:05:22]
found a water leak inside the
[2:05:25]
pantograph. What that did is
[2:05:26]
short-circuited some of the electric
[2:05:29]
circuits inside the pantograph in those
[2:05:30]
parts had to be reordered. We cannot
[2:05:37]
turn those on until the parts have
[2:05:38]
arrived so that is slowing us down. We
[2:05:42]
are not sure exactly what the lead-time
[2:05:45]
on these things, [Indiscernible] is
[2:05:46]
finding out we just found it two weeks
[2:05:48]
ago. They don't have a delivery date
[2:05:50]
yet.
[2:05:54]
>> But, that is for the buses the
[2:05:56]
electric buses. If you did not get
[2:05:59]
that, it doesn't really slow you down
[2:06:03]
that much does it
[2:06:04]
>> Just the electric buses that don't
[2:06:06]
operate yet. We were planning to start
[2:06:10]
that service. So there will be some
[2:06:11]
delay in that
[2:06:15]
>> If this does not happen by the time
[2:06:20]
of World Cup you are still in good shape
[2:06:21]
>> Yes it is not slowing us down. Any
[2:06:24]
other comments or questions? Thank you
[2:06:29]
>> North Houston highway improvement
[2:06:31]
project.
[2:06:34]
>> You are on construction updates.
[2:06:37]
Good morning again Casey McKay
[2:06:43]
preconstruction as well as director of
[2:06:44]
the construction BOOST and roadway
[2:06:47]
projects. First I will go over the
[2:06:50]
concrete asphalt paving for mobility
[2:06:53]
improvement contract one update. The
[2:07:01]
prime contractor completed the Texas
[2:07:02]
Avenue Kirby Drive Montrose and began
[2:07:03]
construction on April 1, 2025 on
[2:07:04]
Washington Avenue and Westcott and will
[2:07:05]
complete that project by the end of
[2:07:09]
January. The picture on the slide show
[2:07:10]
the completed asphalt service pavement
[2:07:13]
near Franklin at the end of the
[2:07:19]
Washington Avenue project. Next I will
[2:07:20]
go over the Holcomb Boulevard update.
[2:07:24]
The contractor began construction in
[2:07:28]
October 2025. The westbound lanes have
[2:07:30]
finish surface paving from Fannin to
[2:07:32]
Kirby, now they are currently milling
[2:07:37]
the two curb lanes from Kirby to
[2:07:48]
Buffalo Speedway and are about to
[2:07:49]
continue all the way to the project
[2:07:50]
westbound and once they finish
[2:07:51]
westbound they will do eastbound. Next
[2:07:54]
I will go over the concrete asphalt
[2:07:57]
paving for mobility and improvement
[2:07:59]
contract number two update the prime
[2:08:03]
contractor began construction in August
[2:08:04]
along Hillcroft from Westpark to
[2:08:07]
Westheimer. They are completed asphalt
[2:08:11]
service paving Harris East 20th and
[2:08:14]
North Post Oak the picture on the left
[2:08:17]
shows the asphalt surface completed on
[2:08:18]
North Post Oak facing I-10. The picture
[2:08:22]
on the right shows the concrete
[2:08:23]
intersection still being worked on on
[2:08:24]
North Post Oak and Westfield. The
[2:08:31]
asphalt project [Indiscernible] is
[2:08:33]
[Indiscernible] which will start
[2:08:34]
milling next week around January 22.
[2:08:41]
Now I look over the JFK concrete panel
[2:08:49]
replacement update. The contractor
[2:08:50]
began construction on January 6, 2026.
[2:08:52]
Cutting and concrete panel replacement
[2:08:55]
began as seen in the pictures. We will
[2:08:58]
complete this project before the World
[2:09:03]
Cup. Next I will go over the BOOST 54
[2:09:10]
segment four project update on Scott
[2:09:11]
Street from Holmes Road to Swingle
[2:09:15]
Drive. The contractor began
[2:09:16]
construction on December 8, 2025. As
[2:09:22]
shown in the pictures on the slide the
[2:09:23]
sidewalk bus stops and shared use Path
[2:09:27]
has started. The project will be
[2:09:32]
complete around July 2026. We have now
[2:09:37]
asphalt surfaced 65.63 lane miles and
[2:09:42]
have restored 49+ lane miles of
[2:09:48]
concrete panel replacements. This slide
[2:09:49]
shows an approximate list of current
[2:09:54]
and upcoming projects. This shows an
[2:09:58]
approximate list of not yet started
[2:10:04]
roadway projects. If there are any
[2:10:05]
questions I'm happy to answer them
[2:10:09]
>> Questions?
[2:10:10]
>> This is Director Ponce. Can you go
[2:10:12]
back to the first slide on Franklin. I
[2:10:23]
think this intersection is amazing have
[2:10:29]
we had conversations with Public Works
[2:10:30]
in Houston regarding ramp accessibility?
[2:10:35]
>> Yes, sir. I believe they are going
[2:10:36]
to be working on that crossing in the
[2:10:39]
near future. We did talk to them and
[2:10:42]
they told us for the striping in that
[2:10:47]
area to leave it as temporary striping
[2:10:48]
because they would be doing work there
[2:10:52]
>> Okay thank you. Other questions?
[2:10:56]
I've got two or three public input from
[2:10:58]
riders or drivers at the Post Oak,
[2:11:03]
magnificent and good to hear. Anybody
[2:11:11]
else? Thank you Casey. Rachel
[2:11:15]
>> It's been a few months but I will
[2:11:24]
move quickly but not talk too fast. I
[2:11:32]
am in the planning group at METRO
[2:11:33]
presenting on North Houston highway
[2:11:35]
improvement project. Basically what is
[2:11:40]
the program and how has METRO planning
[2:11:41]
for it as well is reacting every day.
[2:11:47]
Construction projects are fluid. Where
[2:11:48]
trying to make our system maintain as
[2:11:49]
functional as possible for rail and bus
[2:11:51]
to keep routes running smoothly as
[2:11:56]
possible to also protect the agency
[2:11:58]
assets of course things like their
[2:12:02]
light rail track itself while
[2:12:03]
communicating changes to routes and
[2:12:04]
detours to customers as often as
[2:12:08]
possible. This is a calendar overview
[2:12:11]
of the different segments. I will try
[2:12:15]
to move quickly. Last year to segments
[2:12:16]
were under construction and more in
[2:12:20]
planning and design. Detours and
[2:12:23]
service changes, detours that will be
[2:12:24]
under six months are temporary. We been
[2:12:30]
working with operation group and bus
[2:12:31]
operations to determine what the
[2:12:34]
detours might look like. In some cases
[2:12:35]
it's better to detour a few blocks out
[2:12:37]
of the way then change the route in its
[2:12:41]
entirety. That happened on the nine
[2:12:45]
Gulfton Holman. [Indiscernible] utility
[2:12:46]
work down for three months we have
[2:12:49]
returned the route back to normal
[2:12:53]
operations. The 4041 was included in
[2:12:58]
long-term service change. That is now
[2:12:59]
permanently detouring around while Polk
[2:13:03]
Street is closing. The 54 Scott is
[2:13:04]
going to have to change later this
[2:13:07]
year. The bridges at 288 will come down
[2:13:10]
so that will be a longer-term service
[2:13:14]
change. There are some instances where
[2:13:18]
we change routes working with
[2:13:19]
operations that ended up being
[2:13:20]
fortuitous to keep it that way. The 40
[2:13:23]
market closed down due to detention
[2:13:25]
basin work. For segment three B1 it
[2:13:30]
turned out to be a quicker route time
[2:13:32]
and the housing development got shut
[2:13:33]
down due to the TxDOT project so the
[2:13:35]
ridership base was not there they
[2:13:39]
maintain this route change because I
[2:13:40]
had a better travel time. The first
[2:13:43]
project is the one you have seen I-10
[2:13:49]
at Studemont Heights they are lifting a
[2:13:50]
portion out of the floodplain. While
[2:13:54]
this is not a NHHIP project it does
[2:13:58]
have implications for adjacent segments.
[2:14:03]
I will get into the ramp later because
[2:14:04]
that's where the crux of the impact is.
[2:14:08]
This is on Saint Emmanuel this went
[2:14:09]
into construction last year in October.
[2:14:15]
This is basically providing drainage
[2:14:16]
for the [Indiscernible] happening at
[2:14:21]
state Highway 288. They board under the
[2:14:23]
green and purple tracks to put in large
[2:14:27]
box culverts. We did geotechnical
[2:14:28]
monitoring to make sure there is no
[2:14:30]
track deflection or damage to our
[2:14:35]
assets. We will do that again this year
[2:14:36]
because they have to go under the
[2:14:38]
tracks to install sanitary lines and
[2:14:44]
put in [Indiscernible]. Those are some
[2:14:47]
of the local bus routes we've had to
[2:14:48]
deal with service changes and temporary
[2:14:52]
detours. Segment [Indiscernible] state
[2:14:56]
Highway 288 I-69 the spaghetti noodle
[2:15:01]
tangle south of downtown. The major
[2:15:02]
impacts for us will be bridges for Elgin
[2:15:06]
to [Indiscernible] across 288 will be
[2:15:08]
taken down and replaced a longer-term
[2:15:12]
construction project 54 Scott a
[2:15:16]
high-frequency red route goes across
[2:15:21]
the bridge this will come down later
[2:15:22]
this year but TxDOT agreed to wait till
[2:15:23]
after FIFA and keep alternate routes
[2:15:27]
open [Indiscernible] the buses can
[2:15:29]
route around in a close radius. 3A
[2:15:34]
remains on track for the Wheeler
[2:15:37]
transit Center. The main point to
[2:15:42]
emphasize now as we are in discussions
[2:15:43]
with text Opera advance funding
[2:15:46]
agreement looking at rules and
[2:15:49]
responsibilities might be. Because they
[2:15:50]
need real estate from us which is one
[2:15:52]
of those areas in blue. We want to talk
[2:15:55]
about maybe doing the systems work and
[2:15:59]
roles and responsibilities throughout
[2:16:02]
the design and construction. This will
[2:16:03]
impact both light rail and bus. We will
[2:16:07]
keep the board apprised as we move
[2:16:08]
through the negotiation with TxDOT. The
[2:16:11]
next segment are the three C's the I-10
[2:16:19]
northern downtown this segment does not
[2:16:20]
have a lot of impact for METRO
[2:16:27]
basically they keep the service roads
[2:16:28]
open for I-10 East Park and ride routes
[2:16:29]
should maintain service throughout
[2:16:30]
construction and there's one local
[2:16:32]
route that runs north and south across
[2:16:35]
the freeway and it looks like it will
[2:16:37]
not be impacted it's good news on that
[2:16:43]
segment segment 3C2 as you move closer
[2:16:44]
downtown the I-69 North and I-10 area
[2:16:47]
the main impact for this is it's going
[2:16:49]
to be a design build job that will
[2:16:54]
impact the HOV HOT entrance at the
[2:16:58]
northern end of downtown fortunately
[2:16:59]
most of the equipment is for the
[2:17:03]
further north [Indiscernible] we can
[2:17:12]
take down and store and replace after
[2:17:13]
construction is done the main impact
[2:17:14]
will be that TxDOT stated in order to
[2:17:15]
finish the construction they will have
[2:17:16]
to allow general traffic to use the HOV
[2:17:17]
lane to maintain three lanes in each
[2:17:21]
direction. For a period of 12 to 18
[2:17:23]
months HOV will not have an exclusive
[2:17:26]
Lane which has implications for travel
[2:17:31]
time. Fortunately the rest of the HOV
[2:17:34]
HOT segment will remain unchanged from
[2:17:39]
[Indiscernible] to Kingman that will
[2:17:47]
operate as [Indiscernible]. This
[2:17:51]
segment is by the UH downtown area the
[2:17:52]
main impacts moving the bridges and
[2:17:55]
changing slopes and heights the
[2:18:04]
overhead contact system for light rail
[2:18:05]
is attached to the side of the bridges
[2:18:06]
as they move those we will look at how
[2:18:07]
to retention and redesign the system as
[2:18:08]
well as move foundations and things
[2:18:09]
like that. Right now we are reviewing a
[2:18:10]
rail crossing agreement with TxDOT rail
[2:18:14]
so METRO is looking at doing the design
[2:18:15]
but we would be reimbursed by TxDOT and
[2:18:18]
have to coordinate who would do what
[2:18:23]
during construction. We're in review
[2:18:27]
that agreement right now of course on
[2:18:28]
the other side of UHD redline station
[2:18:30]
the routes coming out of that will be
[2:18:32]
impacted with what happens on Main
[2:18:36]
Street as a demo and reconstruct the
[2:18:43]
bridges. 3C 4 the segment adjacent to
[2:18:46]
White Oak Bayou comes after the White
[2:18:51]
Oak Bayou project. There's going to be
[2:18:52]
some closures potentially later this
[2:18:53]
year with the buy you project that
[2:18:54]
could last up to a year then we will
[2:18:58]
have continuous on and off issues
[2:19:01]
throughout the segments for quite a
[2:19:05]
while that is something we need to work
[2:19:06]
with TxDOT on how to get the park and
[2:19:10]
ride routes in and out of downtown
[2:19:11]
because this impacts all routes coming
[2:19:16]
off of I-10 West. With the rest of the
[2:19:23]
changes happening downtown. Access into
[2:19:24]
downtown is going to change the Pierce
[2:19:25]
elevated is going to be demolished
[2:19:26]
which will impact the St. Joseph
[2:19:29]
Parkway by the building a lot of the
[2:19:32]
access downtown will change and the
[2:19:35]
I-10 HOV entrances will be funneled
[2:19:38]
onto two sets of street north end of
[2:19:45]
downtown [Indiscernible] Smith and
[2:19:48]
Louisiana for I-10 West. There's going
[2:19:49]
to be more traffic on those streets
[2:19:54]
more likely congestion and that has
[2:19:55]
implications for operating time for
[2:20:03]
buses. We hope through proactive
[2:20:04]
planning with TxDOT we can mitigate
[2:20:07]
these impacts we are working with
[2:20:08]
operations and service planning group
[2:20:16]
and every other department at the
[2:20:17]
agency to figure out how to minimize
[2:20:18]
the amount of detours and LRT
[2:20:19]
shutdowns. Basically we are helping
[2:20:20]
TxDOT on the construction sequencing
[2:20:30]
they are not as familiar transit
[2:20:31]
operations that we try to advise them
[2:20:32]
on what would be best for bus and rail
[2:20:35]
operations to minimize shutdowns. We
[2:20:37]
are working with them to try to have
[2:20:38]
major alternate routes open if
[2:20:39]
something is closed for construction.
[2:20:42]
We try to communicate this as often as
[2:20:43]
we can to customers and that trickles
[2:20:48]
down through folks in the call center
[2:20:49]
the website that updates things like
[2:20:52]
that. Of course all the detours that go
[2:20:58]
through [Indiscernible] so that is the
[2:20:59]
gamut of what we are working on right
[2:21:00]
now happy to take any comments.
[2:21:04]
>> Comments or questions?
[2:21:09]
>> Basically what you are telling us is
[2:21:12]
this is a moving disaster. I get it
[2:21:17]
>> I have one question along I-10 245
[2:21:25]
the HOV lane access and 45 access has
[2:21:26]
been closed for some time. Do we know
[2:21:31]
what the plan is and how long that will
[2:21:33]
be
[2:21:38]
>> I heard it is a year or two closure
[2:21:40]
between I-10 West and I45 corridor.
[2:21:47]
What happened [Indiscernible] they have
[2:21:49]
to do a lot of changes so will be
[2:21:50]
closed down for quite a while is my
[2:21:51]
understanding
[2:21:56]
>> You are keeping us up-to-date and
[2:22:00]
this goes over our heads because it's
[2:22:04]
so far out there when you make your
[2:22:06]
reports first thing I would ask is if
[2:22:07]
you see something coming up quickly
[2:22:11]
which is probably the wrong word to use
[2:22:15]
in this context if you see something we
[2:22:16]
need to address the next time you come
[2:22:18]
flag that say you need to look at this
[2:22:22]
now so we're not looking out into 2030
[2:22:28]
and we need to try to keep our
[2:22:29]
passengers and riders informed of this
[2:22:31]
stuff. We will get questions about this
[2:22:34]
stuff you guys are on the front line
[2:22:35]
and will hear a lot about this so if
[2:22:39]
you keep that in mind for us
[2:22:45]
>> Sure
[2:22:46]
>> Anything else?
[2:22:47]
>> Thank you Rachel good work
[2:22:49]
>> Amma, West Belfort Park-and-Ride
[2:22:58]
>> Good morning I am here to brief you
[2:23:07]
on the West Belfort Park-and-Ride
[2:23:14]
facility. I will give a quick overview
[2:23:19]
on the background of the facility some
[2:23:20]
of the existing conditions and the
[2:23:21]
proposed improvements that will bring
[2:23:24]
into this facility and next steps the
[2:23:29]
park and ride is 5969 it's on with the
[2:23:38]
image on the left it is bounded on the
[2:23:40]
north by [Indiscernible] by you on the
[2:23:42]
east by residential area and on the
[2:23:46]
south by some commercial and
[2:23:50]
residential uses as well. It has over
[2:23:53]
1800 parking spaces for bus space and
[2:23:58]
serves to local and to express bus
[2:24:01]
routes. It was one of our busiest
[2:24:07]
routes, systems facilities during the
[2:24:10]
covid time and post COVID we saw tick
[2:24:15]
up in ridership which we are excited
[2:24:19]
about. Nonetheless over the years this
[2:24:20]
facility has been in need of some
[2:24:24]
upgrades. We have explored different
[2:24:26]
means of improving the facility. Due to
[2:24:31]
some of our amenities, particularly
[2:24:36]
related to the canopy, drainage and ADA.
[2:24:46]
This is an image of the existing and
[2:24:47]
current conditions of the facility the
[2:24:52]
canopy due to weather has caused wear
[2:24:55]
and tear discoloring of the canopy and
[2:24:56]
exposing the railing of the facility as
[2:24:59]
you can see on the top image in the
[2:25:08]
center of the picture. There has been
[2:25:09]
some rust to the canopy as well.
[2:25:17]
Related to the drainage, some localized
[2:25:18]
flooding continues to happen after we
[2:25:22]
have inclement weather. This is due to
[2:25:26]
insufficient inlet coverage in
[2:25:30]
low-lying areas. And poorly aligned
[2:25:33]
flow path, subsidence has altered the
[2:25:36]
pavement grading and limited capacity
[2:25:42]
with existing storm pipe. The
[2:25:44]
pedestrian network existing conditions
[2:25:47]
has noncomplying curb ramps faded and
[2:25:49]
missing high contrast markings. Some of
[2:25:53]
the curb ramps and designated landing
[2:25:55]
spots have to go into ADA compliance.
[2:25:59]
There are some unmanaged vegetation
[2:26:01]
encroaching on the work path and
[2:26:08]
complicating the way pedestrian
[2:26:14]
navigate the facility. With these
[2:26:15]
issues we are planning some targeted
[2:26:20]
improvements and provide the facility
[2:26:21]
to a state of good repair. Also be safe
[2:26:25]
reliable and accessible for patrons.
[2:26:29]
I'm going to start with the drainage
[2:26:33]
improvements. We are looking to provide
[2:26:34]
some selected inlet replacement pipe
[2:26:38]
upgrades and installation of targeted
[2:26:42]
drainage improvements regrading the
[2:26:46]
pavement for faster drainage. We are
[2:26:47]
hoping to incorporate permeable
[2:26:50]
pavement and native plants to manage
[2:26:54]
the water runoff. In relation to
[2:26:58]
pedestrian network there will be
[2:26:59]
installation of ADA compliant ramps,
[2:27:04]
enhanced surface treatment such as
[2:27:07]
repainting of the crosswalks. All aimed
[2:27:12]
to create a safer more navigable
[2:27:14]
environment for all pedestrians. With
[2:27:17]
our canopy we are looking to provide an
[2:27:23]
aluminum panel and will wrap columns
[2:27:27]
with aluminum raps and upgrade lighting
[2:27:35]
on the facility. We have also
[2:27:36]
identified some grant funding
[2:27:39]
opportunities that Allen's group
[2:27:43]
discussed today through the FTA grant
[2:27:45]
5339, the bus and bus facilities and
[2:27:49]
5337 state of good repair grant, which
[2:27:53]
we will be using toward improving the
[2:27:56]
site. For the next steps, we are hoping
[2:28:00]
to complete project development in the
[2:28:01]
first quarter of this year with an
[2:28:07]
evaluation of the concept looking for
[2:28:12]
some energy efficient components for
[2:28:14]
the site as well as selective parking
[2:28:15]
covered parking on some of the lots and
[2:28:17]
secondary components we see fit for
[2:28:21]
bringing this facility to a state of
[2:28:25]
good repair. Because these are federal
[2:28:27]
grants we have to do any of our
[2:28:33]
reevaluation. We have started that work
[2:28:34]
and hope to complete that in second
[2:28:36]
quarter of this year we hope to bring
[2:28:40]
commence on design and third quarter of
[2:28:44]
this year and complete it in the first
[2:28:45]
quarter of 2027 and procure construction
[2:28:51]
in the first quarter of 2027 and start
[2:28:52]
construction third quarter of 2027,
[2:28:55]
with a completion of construction
[2:28:58]
sometime in the first quarter of 2028.
[2:29:06]
We will bring, in terms of design we
[2:29:09]
will have a task order to for the
[2:29:14]
design contracts Shree brought to the
[2:29:18]
board today. We will be working with
[2:29:19]
his design team on that as well. These
[2:29:23]
are some of the improvements we are
[2:29:28]
planning for the facility. We are
[2:29:29]
hoping to bring updates as we advance
[2:29:32]
the concept and components we are
[2:29:35]
bringing to the facility. Comments or
[2:29:36]
questions?
[2:29:42]
>> How old is that transit center
[2:29:47]
>> It was built in 1993
[2:29:48]
>> That's 22 years old. About time we
[2:29:50]
did some work out there. Anything else?
[2:29:57]
I think that does it thank you very much
[2:30:03]
>> Shri I have one quick briefing. A
[2:30:08]
little bit of context back in 2018
[2:30:13]
transportation off peak direction HOV
[2:30:17]
lane to allow METRO to utilize the
[2:30:21]
inside lane next to the barrier
[2:30:25]
separated HOV lane. This concept would
[2:30:28]
provide METRO the ability to get the
[2:30:32]
buses back in the direction to the park
[2:30:33]
and ride and come back. And then next
[2:30:42]
slide please, that is a picture of what
[2:30:45]
we are talking about. The lane next to
[2:30:49]
the HOV lane. Basically it is in the
[2:30:54]
off peak direction, the striping and
[2:31:01]
signage there. This is a close-up
[2:31:02]
picture of what we are talking about.
[2:31:04]
That particular agreement with TxDOT
[2:31:08]
said if we were not using it and it was
[2:31:10]
not utilized they would come back and
[2:31:11]
ask us to remove it. They make that
[2:31:13]
recommendation now and we agree with
[2:31:19]
them. We will basically ask to go ahead
[2:31:22]
and remove it. That is a quick briefing
[2:31:25]
on this particular topic
[2:31:32]
>> Any questions? It makes sense okay
[2:31:33]
thank you for the update that is our
[2:31:40]
last breathing does anybody on the
[2:31:41]
board have anything to add before we
[2:31:43]
close. We will call the infrastructure
[2:31:48]
committee closed. At 11:35 AM we are
[2:31:51]
adjourned
[2:31:56]
>> The customer experience operation
[2:31:57]
and business development committee
[2:32:00]
meeting will meet in about five minutes.
[2:32:04]
We will take a five-minute break good
[2:40:35]
morning. It is 11:44 AM. The customer
[2:40:40]
experience operation and business
[2:40:45]
development committee METRO Board of
[2:40:46]
Directors will begin at this time. We
[2:40:50]
have one public speaker. Dominic Maisoc
[2:40:54]
>> Dominic are you there?
[2:41:22]
>> We may have to come back to Dominic
[2:41:28]
>> We will come back to him. We will
[2:41:33]
proceed with our first speaker. The
[2:41:36]
first item on the agenda. Action item
[2:41:42]
number two Michael Kyme
[2:41:43]
>> Thank you Chair Preston. good morning
[2:41:46]
committee. These are, the next two are
[2:41:49]
related to the inventory. First
[2:41:53]
will be [Indiscernible] and the second
[2:41:55]
engines. The first one is for a
[2:42:01]
recommendation to execute a contract
[2:42:04]
with Cummins Southern Plains for
[2:42:06]
transmissions for three-year contract
[2:42:09]
and the total amount of $1.563 million
[2:42:15]
and some change which represents a base
[2:42:18]
contract to 1.3 million with a
[2:42:21]
contingency of 260,000. Three-year
[2:42:23]
contract as needed for operations. Any
[2:42:34]
questions? Are there any questions? No
[2:42:35]
questions we will move the item forward
[2:42:38]
>> Thank you
[2:42:39]
>> The next item is for engines also an
[2:42:42]
inventory item. This will go to a
[2:42:45]
company Holt truck centers of Texas
[2:42:48]
also for a three-year contract total
[2:42:57]
contract value $18,949,000. This also
[2:42:59]
includes a contingency amount of 3.1
[2:43:02]
million. This is for engines for
[2:43:05]
inventory on an as-needed basis for
[2:43:08]
three years. Any questions regarding
[2:43:12]
this item? How many engines are they
[2:43:13]
>> 109 engines
[2:43:16]
>> At about 60,000 per engine
[2:43:19]
>> Are there any questions? no
[2:43:23]
questions we will move the item
[2:43:26]
forward. Thank you Mr. Kyme. Next item
[2:43:34]
Samuel Rumhizha
[2:43:42]
>> Board members, interim president and
[2:43:46]
CEO good morning my name is Samuel, I
[2:43:49]
am the vice president of fleet
[2:43:52]
services. I have a couple of items. The
[2:43:57]
first item is a sole-source. I'm going
[2:44:00]
to tell you a story about this 2095 a
[2:44:06]
CNG bus. It's a new bus, fortunately
[2:44:12]
about 21,000 miles on it which was
[2:44:16]
unfortunately involved in a major
[2:44:18]
accident. Being a new bus, a couple of
[2:44:23]
problems come with that. The frame was
[2:44:26]
damaged which means it would need
[2:44:33]
people that can resuscitate bad and
[2:44:36]
being a brand-new bus the only
[2:44:37]
organization that can look into this
[2:44:38]
bus is the regional OEM which is new
[2:44:42]
flyer, the requests we have for that we
[2:44:46]
request board authorization for the
[2:44:51]
Interim President CEO to approve and
[2:44:52]
execute a sole-source contract with new
[2:44:57]
flyer industries Canada for the
[2:44:59]
accident repairs a CNG bus 2092 at a
[2:45:03]
maximum contract value of $534,000
[2:45:10]
which includes a 20 percent METRO
[2:45:17]
contingency amount of $89,000. Are
[2:45:18]
there any concerns or questions?
[2:45:25]
>> Any questions? no questions, we will
[2:45:28]
move the item forward. The next item
[2:45:33]
>> The next item is I will give a story
[2:45:44]
on this one too. Our fleet the diesel
[2:45:45]
and CNG buses have Cummins engines on
[2:45:50]
them. Sometimes we have challenges to
[2:45:53]
be able to take care of items out of
[2:45:56]
warranty. We do tune-ups and things like
[2:45:59]
that and we are so far better when we
[2:46:02]
have a contract with Cummins where we
[2:46:08]
are able to use them when we need them.
[2:46:10]
Here is the request on the item.
[2:46:17]
Request board authorization for the
[2:46:18]
Interim President CEO to negotiate and
[2:46:19]
execute a three-year contract with two
[2:46:21]
options to extend for one year the
[2:46:28]
Cummins Southern Plains maintenance and
[2:46:31]
repair of Cummins diesel and compressed
[2:46:34]
natural gas engines at a maximum
[2:46:41]
contract amount of 3,500,000. Questions?
[2:46:48]
>> There are no questions or comments
[2:46:49]
we will move the item forward next item
[2:46:54]
>> The last item again this one is
[2:46:57]
pretty exciting. This involves the
[2:47:00]
[Indiscernible] rants we got for CNG
[2:47:03]
buses at the Northwest facility. As we
[2:47:08]
start moving forward with this, I have
[2:47:13]
met with some of the engineering and
[2:47:16]
construction team on site to look at
[2:47:17]
the fuel stations to be built. However
[2:47:18]
we need to go ahead to get a place in
[2:47:25]
line for us to order the 100 buses
[2:47:28]
associated with the grant. The request
[2:47:34]
is board authorization for Interim
[2:47:35]
President CEO to negotiate and execute
[2:47:36]
a contract with New Flyer of America as
[2:47:40]
part of the FTA grant program for the
[2:47:50]
purchase of 100 CNG transit buses at a
[2:47:51]
maximum contract amount of $102 million.
[2:47:55]
Which includes a 10 percent METRO
[2:47:59]
control contingency of $9,330,000
[2:48:03]
>> Questions or concerns? there being
[2:48:12]
no questions or comments we will move
[2:48:13]
the item forward thank you so much. At
[2:48:18]
this time the next item is Gary Howard
[2:48:21]
>> Good afternoon. Gary Howard vice
[2:48:30]
president rail operations. Today I'm
[2:48:31]
here to talk about track geometry
[2:48:34]
overhead contact system hide and
[2:48:36]
stagger and wire measurement services.
[2:48:43]
That's a mouthful for you to give
[2:48:44]
background before I give you the
[2:48:47]
recommendation, the services performed
[2:48:48]
a annually required to help identify
[2:48:54]
potential track geometry defects in the
[2:48:57]
overhead contact wire system, what we
[2:48:58]
call a height and stagger. The wire
[2:49:02]
conditions that may be on the rail
[2:49:04]
system, any defects are found our MOW
[2:49:10]
maintenance of way inspect the
[2:49:15]
identified area, schedule repairs, and
[2:49:16]
essentially ensure our system stays up
[2:49:19]
and running. By conducting this type of
[2:49:23]
testing on the rail corridor could
[2:49:25]
potentially negatively impact service
[2:49:28]
to customers. The recommendation is
[2:49:31]
requesting board authorization for
[2:49:36]
Interim President CEO to execute and
[2:49:40]
deliver a three-year contract with two
[2:49:41]
one-year options with rail pod Inc. to
[2:49:44]
provide annual track geometry overhead
[2:49:49]
contact system height and stagger and
[2:49:53]
wire where measurement services on
[2:49:57]
METRO rail corridors the contract will
[2:49:58]
cover all three corridors the red green
[2:50:01]
and purple, with a value not to exceed
[2:50:06]
$1,496,000 are there any questions?
[2:50:14]
>> Any questions? no questions or
[2:50:15]
comments thank you we will move the
[2:50:16]
item forward
[2:50:19]
>> Next item is Rocky Marrero
[2:50:30]
>> [Indiscernible] good afternoon
[2:50:31]
Reverend and board members. My name is
[2:50:34]
[Indiscernible] I'm the manager for
[2:50:40]
project management. This request we
[2:50:43]
seek board authorization to approve the
[2:50:44]
execution of a contract with
[2:50:47]
[Indiscernible] partners in a not to
[2:50:53]
exceed amount of $378,413. This
[2:50:54]
includes a base contract amount of
[2:51:01]
$344,012 with a 10 percent METRO
[2:51:07]
control contingency of $34,401. The
[2:51:11]
contract covers the cleaning priming
[2:51:15]
rust removal and painting of steel
[2:51:16]
support and canopy structures at the
[2:51:17]
rail station platforms, specifically 34
[2:51:20]
of them. This project is in support of
[2:51:22]
state of good repair, the major goal is
[2:51:25]
for us to do corrosion prevention,
[2:51:29]
lifespan extension anesthetics and
[2:51:31]
compliance. This item was solicited
[2:51:36]
from invitation to bid which went to
[2:51:37]
the street in November 2025. We had six
[2:51:42]
bidders, received January 8 and
[2:51:45]
[Indiscernible] was the lowest
[2:51:50]
responsive bidder. METRO establish a 35
[2:51:53]
percent small business goal tidy Pro
[2:51:54]
partners has committed to that small
[2:52:00]
business participation. I'm glad to
[2:52:01]
answer any questions or comments
[2:52:05]
>> Any questions?
[2:52:12]
>> Thank you sir, no questions or
[2:52:14]
comments we will move the item forward
[2:52:15]
>> Thank you
[2:52:17]
>> At the beginning of the meeting we
[2:52:21]
allow space for public comment. We will
[2:52:24]
go back to that portion of the meeting.
[2:52:29]
Do we have any public speakers
[2:52:31]
>> Dominic Maisoc is on the line
[2:52:35]
>> Reverend can you hear me? I hear you
[2:52:41]
yes. Okay sorry about the difficulties.
[2:52:45]
Reverend, I think in the previous
[2:52:50]
meeting somebody was saying there was
[2:52:53]
discussion about the Hardy yards and
[2:53:00]
the Burnett transit Center working
[2:53:01]
together I think there are two other
[2:53:02]
opportunities for that to happen number
[2:53:06]
one I think it should be a
[2:53:08]
[Indiscernible] transit center with the
[2:53:10]
new extension of public housing across
[2:53:15]
from your church on North Main Yale and
[2:53:23]
Cross Timbers. Three or four different
[2:53:27]
bus routes come through 23, 36, 44 and
[2:53:30]
40. That would be a chance for people
[2:53:34]
to meet and connect. Maybe they can go
[2:53:36]
into town or somewhere else without
[2:53:37]
going to the North land transit center.
[2:53:41]
Secondly, I believe a couple years ago
[2:53:47]
Harris County Housing Authority got a
[2:53:49]
low bid on the southeast transit
[2:53:51]
center. I don't know part of that was
[2:53:56]
access, although transit centers are
[2:53:58]
usually have the fence around them but
[2:54:01]
I think for these people in a public
[2:54:06]
housing situation, there should be at
[2:54:07]
least a gate or something that they can
[2:54:13]
access the public facilities. Also,
[2:54:19]
too, I think with the 40 and 41 going
[2:54:23]
through downtown. Right now it crosses
[2:54:25]
the Red Line at Main Street Square. I
[2:54:29]
think you might be looking to move that
[2:54:39]
down to the next transit stop, I think
[2:54:46]
it is Clay or Polk somewhere south of
[2:54:51]
there so when the 40 and 41 come across
[2:54:55]
they can leave the Dallas and come
[2:54:57]
straight across without that large
[2:55:01]
detour. That would also put 40 and 41
[2:55:08]
near the [Indiscernible] center. And
[2:55:09]
with the GRB moving south, with the
[2:55:13]
extension it still would access that
[2:55:19]
area also I mentioned in the other
[2:55:22]
meeting about the Union Pacific merger.
[2:55:29]
I do know they cannot make a public
[2:55:33]
comment. However METRO and other
[2:55:38]
government agencies can. I think legal
[2:55:39]
needs to look at that 7000 page report,
[2:55:42]
look at what Union Pacific wants to do
[2:55:44]
with the terminal. METRO needs to speak
[2:55:47]
up. And maybe METRO has County and
[2:55:54]
other entities together can go to the
[2:55:55]
service transportation board and say
[2:55:58]
this is going to affect rail crossings
[2:56:00]
and traffic and affect public transit.
[2:56:08]
Union Pacific needs to do things to
[2:56:09]
mitigate additional traffic into our
[2:56:13]
fragile rail system. With that I have
[2:56:16]
no other comments I will send it back
[2:56:17]
to you Reverend Preston thank you
[2:56:18]
>> Thank you Mr. Maisoc. At this time
[2:56:23]
we will go to the briefings. Item 9,
[2:56:29]
Eddie Miranda and Kurt Luhrsen
[2:56:34]
>> Thank you. I will speak first, I
[2:56:38]
will invite Taylor to the podium to
[2:56:39]
give you an update.
[2:56:43]
>> Good morning how is everyone today.
[2:56:46]
I will give a quick update on FIFA.
[2:56:53]
Next slide please. I'm going to go in
[2:56:54]
order of meeting so far. The first one
[2:56:58]
was FIFA football, that's a downtown
[2:57:01]
management District. The main purpose
[2:57:03]
is for the consulting group to
[2:57:07]
understand METRO operations and
[2:57:10]
schedules, better understand the
[2:57:13]
overall plans in downtown. The work
[2:57:14]
they are doing does not interfere with
[2:57:16]
our services. Their work is focused on
[2:57:20]
pedestrian walkways. We had another
[2:57:21]
meeting yesterday to go for more
[2:57:24]
information. They were going to have
[2:57:25]
weekly and biweekly meetings until the
[2:57:29]
tournament. The next meeting was local
[2:57:33]
transportation committee, there is no
[2:57:34]
fee for officials it's mostly local
[2:57:38]
stakeholders. With the airport system
[2:57:43]
trans Star County city. The main thing
[2:57:44]
is we are waiting for the road closures
[2:57:48]
around the stadium. They are
[2:57:49]
potentially look at security perimeter
[2:57:51]
figuring out the radius they want to
[2:57:53]
do. We will get more info on that one.
[2:57:58]
There was supposed to be human
[2:58:01]
trafficking accessibility meeting but
[2:58:02]
those were canceled at the last second.
[2:58:06]
The main thing is we are waiting for
[2:58:07]
the trainings for the human trafficking
[2:58:09]
accessibility. Though some are catered
[2:58:14]
for large events. We offer those at
[2:58:16]
METRO and do the trainings so this will
[2:58:17]
be additional steps there are
[2:58:21]
recommending. Last Friday METRO
[2:58:22]
operations held an internal meeting,
[2:58:27]
operations to get the departments on
[2:58:28]
the same page make sure everybody
[2:58:29]
understands what's happening give an
[2:58:34]
opportunity to ask questions. We have
[2:58:36]
members from the host committee as well
[2:58:37]
they were pleased with the meeting and
[2:58:38]
see we are working hard and working
[2:58:40]
toward what they want us to achieve.
[2:58:45]
Looking forward we have our standard
[2:58:46]
meetings every month with them. Houston
[2:58:51]
venue transportation mobility meeting.
[2:58:52]
That's what we had earlier the, that
[2:58:56]
includes FIFA official so it gives us a
[2:58:57]
chance to get feedback from FIFA.. We
[2:59:04]
probably talk about mobility plans
[2:59:05]
turned in an October we got feedback
[2:59:08]
from FIFA in December Leticia in
[2:59:09]
operation spearheaded comments they
[2:59:12]
gave us she was able to respond to
[2:59:13]
every single one of them. They are
[2:59:15]
still pending some based on lane
[2:59:23]
closures around fan Fest,. Once we have
[2:59:26]
that we will get maps back to the host
[2:59:27]
committee we are waiting on answers
[2:59:31]
from the airport regarding potential
[2:59:32]
ADA accessibility from where we have
[2:59:35]
our new terminal for the fan Fest. The
[2:59:41]
key next steps we look forward to, we
[2:59:44]
have the final mobility plan due March
[2:59:48]
1. We work through the final comments
[2:59:50]
we will turn it back into the host
[2:59:53]
committee and get feedback. Once we get
[2:59:58]
through the planning process we will
[2:59:59]
have detail such as schedule and timing
[3:00:02]
to the plan. We need to confirm fleet
[3:00:06]
and operator availability, finalize
[3:00:08]
service qualities we will submit the
[3:00:13]
final plan in March. Obviously ongoing
[3:00:15]
coordination with leadership and board
[3:00:19]
updates as we finalize. That's all I
[3:00:20]
have are there any questions?
[3:00:30]
>> Thank you so much no questions
[3:00:31]
>> We will move to the next item
[3:00:33]
communication quarterly report,
[3:00:34]
Meredith Johnson
[3:00:38]
>> Good morning today's update
[3:00:49]
highlights how communication is
[3:00:50]
supporting METRO priorities through
[3:00:51]
proactive messaging strategic marketing
[3:00:52]
measurable results are focus on
[3:00:53]
increasing awareness strengthening
[3:00:54]
engagement supporting ridership across
[3:00:55]
the system. Our communication goals are
[3:00:57]
straightforward. Make it easier for
[3:00:58]
people to understand METRO engage with
[3:01:04]
services and choose transit. Everything
[3:01:05]
we do is centered on clear information
[3:01:06]
strong visibility and supporting
[3:01:10]
ridership growth. Let's get into it for
[3:01:11]
the quarter for early September
[3:01:15]
marketing executed a three-part
[3:01:16]
campaign focused on Route 500 to the
[3:01:19]
airport. METRO now in general ridership
[3:01:29]
information we partner with media
[3:01:30]
outlets including general markets and
[3:01:33]
Spanish-language television
[3:01:34]
[Indiscernible] METRO services and how
[3:01:35]
to reinforce presence across the region.
[3:01:39]
Specifically from early September to
[3:01:41]
early November marketing, pardon me, I
[3:01:44]
think we got out of order, we played a
[3:01:51]
critical role in supporting the ride
[3:01:52]
METRO app and the new fare system,
[3:01:57]
created dozens of how to graphics and
[3:01:58]
instructional materials to make it easy
[3:02:01]
for riders. They are designing new
[3:02:06]
materials to support the terminal
[3:02:07]
change insuring travelers have clear
[3:02:08]
consistent ways of wayfinding during
[3:02:10]
the transition. This is about reducing
[3:02:15]
confusion and improving the rider
[3:02:16]
experience helping customers navigate
[3:02:18]
technology and service updates.
[3:02:20]
Targeted marketing which I was talking
[3:02:23]
about drove measurable ridership growth
[3:02:26]
for the 500 route with a 12 percent
[3:02:30]
increase in October demonstrating
[3:02:31]
focused outreach support service usage.
[3:02:39]
Is important to note it's often
[3:02:40]
difficult to credit ridership growth to
[3:02:41]
one factor especially as it pertains to
[3:02:43]
communication efforts. In this instance
[3:02:45]
the only thing that changed during the
[3:02:46]
time period was public engagement
[3:02:48]
efforts targeted marketing and earned
[3:02:51]
media on the route and that reflects 12
[3:02:54]
percent growth. Are social media impact,
[3:03:00]
we generated more than 535,000
[3:03:04]
impressions 24,000 engagements and 14
[3:03:05]
part two percent engagement growth with
[3:03:09]
videos driving views Instagram audience
[3:03:13]
continues to grow at a rapid pace
[3:03:18]
reaching 10.8 thousand followers. These
[3:03:19]
results show how strong our growth and
[3:03:23]
social media is. Something you won't
[3:03:25]
see on the screen because I just
[3:03:26]
finalize the number is total
[3:03:28]
impressions for 2025 6.7 million a 98.8
[3:03:36]
percent growth in compared to this time
[3:03:39]
last year. If I was in one of your
[3:03:40]
seats I would ask why? What is
[3:03:44]
different? But we have seen as a strong
[3:03:48]
follower growth. We've intentionally
[3:03:50]
aligned our social strategy with how
[3:03:56]
people consume information today.
[3:03:59]
Audiences are skeptical of the
[3:04:00]
traditional in-your-face tactics and
[3:04:01]
platform algorithms prioritize content
[3:04:02]
that feels organic, credible and
[3:04:05]
conversational. We are focused on
[3:04:06]
native content rather than repurposed
[3:04:09]
ads, storytelling over slogans and
[3:04:12]
trusted voices of customers over
[3:04:16]
polished branding. We are seeing higher
[3:04:17]
engagement more shares and follower
[3:04:20]
growth not because we spend more
[3:04:21]
because the content is more credible.
[3:04:29]
One of our first initiatives with the
[3:04:30]
new internal group was the city lights
[3:04:31]
Christmas carolers. We have some talent
[3:04:35]
at METRO. We brought together
[3:04:36]
volunteers to sing and play music on
[3:04:37]
the platforms. METRO was true partner
[3:04:39]
with the community on this. One of our
[3:04:43]
MPD officers played the saxophone,
[3:04:46]
chief you have some talent there. One
[3:04:49]
of the other things we did is relaunch
[3:04:56]
the METRO Ambassador program. This is
[3:04:57]
going to be crucial as we head into
[3:04:59]
World Cup to engage employees to be
[3:05:01]
part of the experience. We time that
[3:05:04]
announcement with the FIFA World Cup
[3:05:09]
draw party. That day we had 100
[3:05:10]
volunteers sign up to be ambassadors
[3:05:11]
and have grown since then. We look
[3:05:18]
forward to more plans coming on how
[3:05:19]
employees will be throughout the
[3:05:20]
community making sure people get to
[3:05:21]
where they need to be. We are being
[3:05:31]
targeted with participation with
[3:05:32]
stakeholders focus on key groups where
[3:05:33]
we can grow ridership like student
[3:05:36]
seniors and underserved communities. We
[3:05:38]
make sure there's no corner of the
[3:05:39]
region we offer service that don't know
[3:05:40]
METRO can connect them to opportunities
[3:05:41]
education and move around the region.
[3:05:47]
This consistent presence supports our
[3:05:48]
key initiatives such as securing
[3:05:51]
stakeholder letters and building new
[3:05:52]
enthusiasm for new route like the 500.
[3:05:55]
We hear from many stakeholders and
[3:05:56]
customers they want the Community
[3:06:00]
Connector. We have a long and growing
[3:06:02]
list so decisions ahead on where and
[3:06:07]
how to expand. Engagement efforts are
[3:06:08]
focused on meeting riders where they
[3:06:11]
are, onboard outreach real engagement
[3:06:18]
and university outreach [Indiscernible]
[3:06:20]
from October to December public
[3:06:21]
engagement completed 300 engagements
[3:06:22]
and touch points around the region, 80
[3:06:26]
meetings 116 community events and one
[3:06:28]
group in the public engagement that
[3:06:29]
focuses on infrastructure has been busy.
[3:06:35]
I will save the update on that for the
[3:06:36]
next meeting but we've got a lot of
[3:06:40]
construction work going on. We send out
[3:06:41]
mailers walk door to door up to
[3:06:45]
businesses attend the meeting our team
[3:06:47]
gets out personal cell phone number so
[3:06:48]
people can call with questions about
[3:06:51]
the project. We are focused on the
[3:06:54]
messaging from a macro perspective we
[3:06:55]
are fixing the roads to keep Houston
[3:06:56]
from having a heart attack. We are
[3:07:04]
addressing on-time performance in doing
[3:07:05]
so and making it easier for people to
[3:07:06]
choose METRO more on that to come. Key
[3:07:14]
takeaways is that this reflects a
[3:07:15]
coordinated communication team using
[3:07:16]
data storytelling and community
[3:07:18]
engagement these efforts are increasing
[3:07:21]
awareness building trust and supporting
[3:07:22]
ridership growth while positioning
[3:07:26]
future growth. The communication team
[3:07:28]
is well-positioned right now to do this
[3:07:29]
because our agency is working as a whole
[3:07:35]
enthusiastic well coordinated and the
[3:07:36]
small communication victory show an
[3:07:37]
entire agency working together to move
[3:07:38]
forward the best we can. That concludes
[3:07:44]
my presentation are there questions?
[3:07:45]
>> No questions just a comment. Looking
[3:07:49]
at all the numbers, I'm excited. I am
[3:07:58]
proud of the efforts and I think the
[3:07:59]
way your department has been doing and
[3:08:03]
getting involved with the public and do
[3:08:09]
all kind of things, just look at the
[3:08:17]
numbers, it's very impressive. You're
[3:08:18]
doing a very good job thank you
[3:08:22]
>> Meredith could you answer one
[3:08:23]
question for me or share with us what
[3:08:27]
is the value of having trusted voices
[3:08:34]
as we navigate telling our story and
[3:08:36]
the storytelling piece
[3:08:37]
>> People like organic information. We
[3:08:41]
are all users of technology coming at
[3:08:46]
us in different ways. People want to
[3:08:47]
see someone that looks like them things
[3:08:48]
like them talk like them using the
[3:08:50]
system because they trust that person
[3:08:53]
and they wanted to. Rather than the old
[3:08:59]
traditional way of somebody popping on
[3:09:00]
the TV screen with a flashy commercial,
[3:09:08]
that does not build trust if you see
[3:09:09]
somebody you trust or no or like the
[3:09:10]
system you're more likely to try it in.
[3:09:16]
It's really important that we are
[3:09:17]
working with people in the community
[3:09:18]
that have those voices to reach people
[3:09:19]
and encourage you to ride METRO
[3:09:21]
>> Are there any other questions or
[3:09:24]
comments? board member Ponce
[3:09:28]
>> Meredith and team, fantastic job.
[3:09:32]
Very fortunate to work alongside with
[3:09:34]
you all. You are amazing. Don't ever
[3:09:37]
hesitate to reach out to board member
[3:09:39]
and use us as well to send a message
[3:09:45]
across. Thank you
[3:09:49]
>> I appreciate that. Shout out to you
[3:09:50]
for giving me great ideas on social
[3:09:53]
media content, I encourage you for
[3:09:55]
everyone here we love to tell great
[3:09:56]
stories so thank you
[3:09:57]
>> Thank you very much. This concludes
[3:10:03]
the communication quarterly report. We
[3:10:04]
will move to item 11, the monthly
[3:10:08]
business development report, Russ Frank
[3:10:16]
>> Hello board members. This is our
[3:10:19]
monthly business development update
[3:10:20]
ways we work to improve the customer
[3:10:23]
experience to make more customer
[3:10:28]
centric and increase ridership. One a
[3:10:30]
METRO's biggest customer projects in
[3:10:31]
the last 18 years since the launch of
[3:10:35]
the Q Card. Is the ride METRO fare
[3:10:36]
system to the new system has launched
[3:10:38]
we began a soft launch on December 1
[3:10:43]
this is when we turned on elements of
[3:10:44]
the system and started getting
[3:10:45]
customers on the system making sure
[3:10:49]
everything would work well we had a
[3:10:50]
public launch last Monday on January 5.
[3:10:54]
This is where we turned on additional
[3:10:56]
elements of the system additional
[3:10:57]
functions on the ride METRO app we
[3:11:02]
turned on the ride story and full
[3:11:06]
functionality of the TVM we are running
[3:11:07]
the Q Card system have not turned off
[3:11:10]
the old system yet we need to allow
[3:11:13]
many months for customers to transition
[3:11:14]
from the old fare system to the new
[3:11:15]
system we want to get familiar with the
[3:11:19]
system. We have placed information
[3:11:22]
throughout the entire system on the
[3:11:26]
transition to customers. In March, I'm
[3:11:29]
going to go back to the schedule in
[3:11:32]
March we will wind down the Q Card
[3:11:35]
system this is when we begin stopping
[3:11:37]
the loads and weaning people off the
[3:11:42]
system. On April 5 we plan a full
[3:11:45]
decommissioning of the Q Card system
[3:11:46]
meaning we turn off the old TVM and
[3:11:48]
take the old validators off the buses.
[3:11:51]
At that point we will put in additional
[3:12:00]
TVM there was a question about the
[3:12:01]
system if you go to the rail stations
[3:12:02]
we have old equipment and new equipment
[3:12:03]
on the rail stations we have an old Q
[3:12:04]
Card TVM and new TVM on every station
[3:12:07]
every bus has to validators so after we
[3:12:16]
turn off the Q Card system at the
[3:12:17]
beginning of April we will take off
[3:12:18]
that equipment and put new TVM in the
[3:12:26]
place of old ones so all the stations
[3:12:27]
will have new TVM this is planned to be
[3:12:28]
done before FIFA comes to Houston we
[3:12:31]
will have all new equipment on the
[3:12:32]
system we will also work with ride
[3:12:37]
sponsors. We are getting the contract
[3:12:41]
signed these are corporate partners
[3:12:42]
where we have companies who help
[3:12:43]
subsidize the fares for employees they
[3:12:44]
give out the cards for us so we will
[3:12:49]
have each of them have cards and
[3:12:50]
employees uploaded into the system that
[3:12:51]
will be done prior to the shutting down
[3:12:54]
of the Q Card in April. This is a
[3:12:59]
picture of the rail station we have
[3:13:00]
information on the rail station these
[3:13:03]
are examples we have posters that tell
[3:13:04]
customers new ways to pay if you're on
[3:13:11]
the Q Card we have a poster saying go
[3:13:12]
to the old TVM until a transition to
[3:13:15]
the new system. There's a sign on the
[3:13:16]
front of the TVM that says get your
[3:13:19]
card here all machines have been
[3:13:20]
activated so customers can buy cards or
[3:13:22]
buy tickets on the TVM the message at
[3:13:28]
the top tells customers they can reload
[3:13:33]
cards and we have posters to get new
[3:13:35]
METRO fare cards on the system. At the
[3:13:42]
validator on the rail stations you see
[3:13:43]
a sticker it tells customers different
[3:13:46]
ways to pay where they scanned tickets
[3:13:47]
or mobile app or use open payment where
[3:13:49]
they tap on the validator with their
[3:13:54]
Visa or MasterCard Discover American
[3:13:55]
Express Apple or Google pay. On the
[3:14:02]
buses we have bus cards you see
[3:14:03]
examples of where we had bus cards to
[3:14:04]
tell people they need to get their new
[3:14:08]
fare card these are in English Spanish
[3:14:12]
Vietnamese and Chinese we had bus cards
[3:14:13]
that tell customers ways to pay on the
[3:14:18]
fare boxes we have a new sticker that
[3:14:19]
tells customers ways to pay we have
[3:14:23]
brochures on the buses and trains that
[3:14:25]
explain the fare system you see
[3:14:29]
pictures on the right transit centers
[3:14:34]
and park and rides kiosk posters that
[3:14:35]
tell customers to get the new ride
[3:14:37]
METRO fare card. Since this is a
[3:14:41]
critical transition for customers we
[3:14:46]
are using real-time screens at the
[3:14:47]
transit centers to flip every few
[3:14:48]
minutes to remind customers to get
[3:14:49]
their new fare card today. Ride stores
[3:14:50]
are key locations to get the cards. We
[3:14:56]
need to make sure on the Q Card steak
[3:14:57]
and return them in April if the
[3:15:01]
customer wants to transition from the
[3:15:02]
old Q Card to the new system they can
[3:15:06]
come to the ride store and the value of
[3:15:07]
cards from the old cards into the new
[3:15:10]
cards. This can been done at any ride
[3:15:14]
store location you see some of the
[3:15:15]
signs in front of the ride stores. Are
[3:15:22]
bus operators and employees are key
[3:15:27]
part of getting a message to customers
[3:15:28]
we been producing information to get to
[3:15:29]
bus operators and front-line employees.
[3:15:31]
This is an example of a brochure given
[3:15:36]
out for bus operators. There's been a
[3:15:37]
large amount of materials designed by
[3:15:39]
the marketing department and customer
[3:15:40]
information about the new system. This
[3:15:42]
is an example of some of those. There's
[3:15:47]
probably a few more we had certain
[3:15:48]
elements put on the system a coming
[3:15:52]
soon message and soft launch materials.
[3:15:54]
Now we have the full launch materials
[3:15:58]
on the system are telling customers to
[3:16:02]
get the new cards or how the new system
[3:16:03]
works and the different ways to pay. If
[3:16:07]
we learn about other questions
[3:16:10]
customers or employees have four things
[3:16:11]
have been on the system we create other
[3:16:14]
materials to explain things better to
[3:16:18]
customers. We will continue to brief
[3:16:21]
you all each month because we will have
[3:16:22]
things that happen every month we will
[3:16:24]
make sure you know what's happening on
[3:16:28]
the customer transition. To the next
[3:16:29]
item is the vanpool program. We
[3:16:32]
officially relaunched on January 7 last
[3:16:37]
week in the first week and a half we
[3:16:41]
had 50 vanpool deployed for numerous
[3:16:44]
companies including Exxon Mobil
[3:16:45]
Halliburton Baker Hughes Western
[3:16:48]
midstream shall Baylor Hospital and UT
[3:16:52]
dental we had 42 more vans scheduled in
[3:16:55]
January these are targeted at Texas
[3:16:57]
Medical Center institutions for the VA
[3:17:00]
hospital the vanpool program is a
[3:17:04]
regional program a much larger area
[3:17:06]
than just METRO service area it serves
[3:17:11]
a county region. METRO assist customers
[3:17:12]
joining a vanpool a shared ride for
[3:17:14]
customers with similar travel pattern.
[3:17:19]
This is where there's not another
[3:17:20]
service be on the METRO service area
[3:17:22]
customers join a group METRO provides a
[3:17:26]
van help subsidize the van with federal
[3:17:29]
funding employers sometimes subsidize
[3:17:35]
the other part of the ride for
[3:17:36]
employees for some cover the rest of
[3:17:37]
the monthly lease for the van. Many
[3:17:40]
customers are eager to get back on the
[3:17:43]
system. This is one of the vans being
[3:17:44]
delivered to the customer last week.
[3:17:47]
There's one van group that had a happy
[3:17:51]
hour party with their co-riders to
[3:17:52]
celebrate back on the road with their
[3:17:57]
friends the ridership development group
[3:17:58]
I mentioned last year about the Houston
[3:18:03]
business Journal landing page. We had
[3:18:04]
our first article last year. This is
[3:18:10]
the second article published and
[3:18:15]
targeted toward corporate human
[3:18:16]
resource leaders to target them to know
[3:18:17]
about transit benefits for the ride
[3:18:18]
sponsor program. This is paid
[3:18:21]
advertising. Trying to target corporate
[3:18:23]
leaders to sign up to be in the ride
[3:18:26]
sponsor program and understand commuter
[3:18:29]
benefits for employees. This has direct
[3:18:32]
links to the webpage which is for the
[3:18:35]
savings calculator and for the ride
[3:18:40]
sponsor webpage. In addition we have an
[3:18:41]
ad in the book of lists, a lot of
[3:18:47]
corporate offices where they compile
[3:18:48]
lists of businesses and industries so
[3:18:53]
people keep this book most of the year
[3:18:54]
and these ads target corporate leaders
[3:18:58]
being able to have them sign up and
[3:18:59]
understand commuter benefits for their
[3:19:04]
employees. Facility upgrades to the
[3:19:06]
rail lines we've had regular weekend
[3:19:10]
shutdowns. For December we had to shut
[3:19:11]
down someone on December 6 and seven
[3:19:14]
and a longer shutdown from the 11th to
[3:19:19]
the 14th. We make sure customers are
[3:19:22]
informed and know about the bus
[3:19:23]
shuttles that are running for each of
[3:19:25]
the shutdowns we installed 80 posters
[3:19:26]
on the red green and purple lines we
[3:19:29]
had 4500 other customer flyers created.
[3:19:35]
We have variable messages on the rail
[3:19:36]
stations before and during the shutdown
[3:19:40]
we had 38 kiosks at the high-traffic
[3:19:46]
stations. Keeping customers informed
[3:19:50]
about holiday services important. This
[3:19:51]
is a flyer from a couple weeks ago
[3:19:53]
during the holidays we produce these
[3:19:54]
for the fixed route system and
[3:19:58]
METROLift. We have 4200 flyers produced
[3:20:00]
and 12,000 fixed route flyers produced
[3:20:04]
and distributed. Have been briefing
[3:20:08]
your last year as we do enhancement
[3:20:09]
efforts to improve the customer
[3:20:12]
experience at bus stops by replacing
[3:20:13]
old and faded worn-out signs. In the
[3:20:19]
terminal you see in December 641 signs
[3:20:22]
were designed and produced and
[3:20:25]
installed are scheduled. Of those 551
[3:20:26]
were part of the renewal effort. 90 of
[3:20:32]
those were replacement signs this
[3:20:33]
included replacing the full bus stops
[3:20:39]
on routes for [Indiscernible] and
[3:20:44]
updates for the 500 downtown direct. We
[3:20:49]
have updated 45 routes and need to
[3:20:51]
complete 54 more to change out signs in
[3:20:54]
the system. Since September 2024, we
[3:21:02]
were in the process of replacing 6179
[3:21:03]
signs of the 9000 signs in the system
[3:21:05]
and replaced over 1000 damage signs
[3:21:11]
during the time. We had a focus group
[3:21:12]
with friends from link Houston, the
[3:21:17]
topic was to be able to give them
[3:21:18]
briefings about our signage we work on
[3:21:22]
throughout the system. We gave
[3:21:30]
information about bus stops kiosks bus
[3:21:31]
info post rail station signage we had a
[3:21:32]
discussion about what we plan to do and
[3:21:33]
got ideas from them about how to make
[3:21:35]
improvements to signage. I want to
[3:21:36]
remind you about the one METRO customer
[3:21:38]
service initiative. The purpose is to
[3:21:42]
make sure people know and employees
[3:21:43]
that customer service is everyone's job
[3:21:45]
not just people in the customer service
[3:21:50]
department. This has gone on for
[3:21:51]
several years we change the job
[3:21:53]
descriptions years ago and added a
[3:21:57]
bullet that says to provide excellent
[3:21:58]
customer service internal and external
[3:22:02]
customers. We've also heard about the
[3:22:03]
event on Tuesday called popcorn
[3:22:06]
Tuesday. The purpose is to get
[3:22:07]
employees away from the desk to let
[3:22:12]
them come down and motivate them and
[3:22:13]
give them a tip for the week. You see
[3:22:15]
pictures of some of the past tips you
[3:22:22]
see many tips around the building as
[3:22:23]
employees save them and pin them in the
[3:22:27]
cubicles throughout the building lastly
[3:22:28]
I want to mention the customer service
[3:22:32]
stats for December we saw a significant
[3:22:35]
increase in customer engagement from
[3:22:39]
December 2024 to 2025. For 2025 we had
[3:22:41]
12,348 in person visitors at the ride
[3:22:45]
store over 4700 more customers than
[3:22:51]
last December. We had 47,200 customer
[3:22:56]
calls which is over 12,400 more than
[3:23:00]
last December. We had 10,000 customer
[3:23:04]
text conversations, over 3000 more than
[3:23:05]
customer conversations than last
[3:23:10]
December. That is our business
[3:23:11]
development update for the month
[3:23:13]
>> Are there any questions? Board
[3:23:19]
member Vilaseca
[3:23:20]
>> Thank you for the thorough update I
[3:23:22]
appreciate it. On a couple of questions
[3:23:26]
on the last two sides as far as
[3:23:29]
increased engagement at the rideshare
[3:23:32]
store downstairs and a ride store along
[3:23:39]
with calls coming in. Do you attribute
[3:23:40]
that to the change in fare system. Do
[3:23:48]
you have the breakdown of the reasons
[3:23:49]
why people are stopping and why they
[3:23:50]
are calling?
[3:23:51]
>> I think it's a little bit of the
[3:23:53]
fare system we will see more that in
[3:24:00]
the coming months in the ride stores we
[3:24:01]
only have four permanent locations and
[3:24:02]
we opened nine mini ride stores so
[3:24:05]
that data volume there. As we get the
[3:24:06]
new fare system going publicly we will
[3:24:09]
get a lot more in person customers to
[3:24:10]
the stores in the next couple of months
[3:24:12]
ridership has been going up since Covid
[3:24:16]
we still see the effects of that of
[3:24:17]
people calling over the months. When we
[3:24:27]
visit with friends at other transit
[3:24:28]
agencies they implement a new fare
[3:24:29]
system they had high customer
[3:24:30]
engagement over the transition so we
[3:24:31]
think that will hit the coming months
[3:24:35]
you will see these numbers go higher in
[3:24:36]
the next few months
[3:24:40]
>> Okay. And then are we staffed up and
[3:24:43]
prepared to help address additional
[3:24:44]
calls and inquiries with the fare system
[3:24:46]
>> Last couple years we increase
[3:24:48]
headcount to handle longer hours and
[3:24:54]
take more calls in the ride stores we
[3:24:58]
have temporary employees we hired to
[3:24:59]
help with the fare system to work at
[3:25:02]
the mini ride stores to have the
[3:25:03]
headcount to run stores and help
[3:25:07]
customers in person at the 13 ride
[3:25:08]
stores
[3:25:09]
>> Okay thank you
[3:25:11]
>> Board Member Ponce
[3:25:16]
>> Thank you Reverend. Thank you for
[3:25:19]
that presentation very thorough and I
[3:25:21]
appreciate that I'd like to say me and
[3:25:26]
Reverend Preston contributed to the
[3:25:30]
ride store and Vilaseca to I'm sorry we
[3:25:40]
contributed I was able to go downstairs
[3:25:41]
and they gave me a sweater and a pen an
[3:25:43]
additional gear. I have two questions
[3:25:47]
regarding the new fare system. Do we
[3:25:50]
have a percentage of our ridership
[3:25:53]
looks like as to how many of the
[3:25:59]
ridership have transition to the new
[3:26:00]
system
[3:26:01]
>> I don't have those numbers right
[3:26:04]
now. I know we would be work on those
[3:26:05]
numbers it's only just started. Some of
[3:26:10]
our big numbers will come once we get
[3:26:11]
the ride sponsors on so companies help
[3:26:12]
us get those on the system. If you go
[3:26:17]
downstairs you see lines in the ride
[3:26:18]
stores lots of customer is excited to
[3:26:19]
get on the new system. The old system
[3:26:23]
is old and the TBM don't work so lots
[3:26:24]
of customers are excited to get on the
[3:26:26]
system. I can get that for
[3:26:35]
[Indiscernible] I think 1 million card
[3:26:42]
since 2008 when the system when in place
[3:26:47]
those will not be all replace many
[3:26:48]
customers lost their cards and we don't
[3:26:51]
have those we don't have an exact
[3:26:52]
comparison to have old cards in the
[3:27:01]
future we can give you numbers of who
[3:27:02]
is on the system
[3:27:03]
>> Thank you for getting a sweater we
[3:27:04]
had lots of merchandise sales we sold
[3:27:05]
lots of holiday sweaters from employees
[3:27:09]
and from customers. The big hot items
[3:27:10]
some of you tried to buy we had a block
[3:27:18]
set a Lego set. We got one case of
[3:27:19]
those in and they were sold out in four
[3:27:22]
hours. It was just gossip in the
[3:27:23]
building and employees went to buy the
[3:27:27]
sets. We have more coming we don't know
[3:27:28]
when they will be arriving but they
[3:27:30]
have shipped and we will have more
[3:27:33]
those for sale soon
[3:27:34]
>> Wonderful one more question. Link
[3:27:42]
Houston is a great organization I'm
[3:27:43]
thankful we were able to partner and
[3:27:44]
have a conversation with them. I'm
[3:27:47]
interested to know what the feedback was
[3:27:54]
if you don't have that right now
[3:27:55]
that's okay but if you could come back
[3:27:56]
later
[3:27:57]
>> We can give you more information
[3:27:58]
about their ideas I don't have all
[3:28:00]
their comments I was not at the entire
[3:28:02]
meeting but the customer information
[3:28:03]
team led the meeting and we were headed
[3:28:08]
downstairs big posters of all the
[3:28:13]
kiosks and signs explaining how we make
[3:28:14]
it easier for customers and we can get
[3:28:17]
you other ideas. They did not know all
[3:28:18]
the details of what we had done to
[3:28:21]
improve the signs and what it goes into
[3:28:26]
to make the signs so it was a good
[3:28:27]
discussion we can get you the follow up
[3:28:28]
on the feedback
[3:28:29]
>> Thank you very much again I'm sorry
[3:28:31]
director Vilaseca for forgetting you
[3:28:35]
>> Chair of the board
[3:28:40]
>> As I mentioned earlier I want to
[3:28:42]
make sure our park and ride and
[3:28:47]
corporate contracts also sponsors are
[3:28:50]
well aware of their instructions and
[3:28:51]
what they need to do to make sure we
[3:28:53]
don't have disruption
[3:28:57]
>> We are working with the
[3:28:58]
transportation coordinators of each of
[3:28:59]
the companies we are following up with
[3:29:03]
them. All of the companies are not on
[3:29:05]
the new system yet this is the
[3:29:09]
beginning of the process. Over the next
[3:29:10]
few months we work with the companies
[3:29:11]
to make sure they have their cards, can
[3:29:15]
upload employees into the system and
[3:29:16]
distribute those two employees.
[3:29:20]
>> Mr. Frank, thank you so much
[3:29:24]
>> We will move to the next item the
[3:29:28]
next briefing will be Community
[3:29:30]
Connector update
[3:29:35]
>> Good afternoon I will be presenting
[3:29:40]
today. This is a board briefing on the
[3:29:43]
Community Connector service the
[3:29:47]
community service is the operation that
[3:29:49]
uses smaller electric vehicles that
[3:29:53]
provide local trips in designated zones
[3:29:56]
we been working with MV Transportation
[3:30:00]
to operate the service. METRO has a
[3:30:04]
contract with MV Transportation to
[3:30:05]
provide METROLift ADA service and
[3:30:11]
Microtransit service. The METROLift
[3:30:12]
service is the largest part of the
[3:30:14]
contract more than 90 percent of trips
[3:30:19]
provided are ADA trips the remaining
[3:30:21]
portion of the contract provides
[3:30:24]
Microtransit demand response open to
[3:30:25]
the public in designated zones that
[3:30:28]
services similar to the Community
[3:30:32]
Connector service it was natural to ask
[3:30:33]
MV to continue the service. We work
[3:30:36]
with MV they met with the current
[3:30:39]
operator to inspect vehicles develop an
[3:30:41]
operating plan and enter into an
[3:30:43]
agreement with the vehicle operator and
[3:30:48]
the app operator to continue operating
[3:30:49]
the service for 90 days it was a team
[3:30:54]
effort working with procurement legal
[3:30:56]
risk and operations worked with the
[3:30:59]
develop a contract modifications.
[3:31:05]
MV started operating the service with
[3:31:06]
the subcontractor on January 7 so we
[3:31:09]
are in the early stages we been
[3:31:12]
operating for six days we will continue
[3:31:16]
to evaluate the service we are looking
[3:31:17]
to enhance driver training and
[3:31:19]
requirements we will be introducing
[3:31:22]
fare equipment or apt a solution to
[3:31:27]
collect fares we will continue to
[3:31:30]
evaluate the service by developing key
[3:31:31]
performance indicators determine if
[3:31:32]
adjustments are needed and continue
[3:31:34]
working toward the best customer
[3:31:42]
service experience we can. Is a short
[3:31:43]
briefing because we just started a few
[3:31:44]
days ago
[3:31:45]
>> Are there any questions?
[3:31:48]
>> Thank you so much we know it is
[3:31:52]
early thank you for your presentation.
[3:31:56]
A final breathing is the monthly
[3:31:58]
operation report Kurt Luhrsen
[3:32:05]
>> Thank you Reverend Preston I will be
[3:32:09]
giving the update for January covering
[3:32:12]
the performance for the month of
[3:32:17]
December. Over all ridership for local
[3:32:20]
bus continued the trend of slow steady
[3:32:23]
increases we've seen post covid
[3:32:30]
Curb2Curb we have expanded that in the
[3:32:31]
last year so that continues to grow as
[3:32:34]
does our commuter park and ride services
[3:32:38]
as more and more employees are coming
[3:32:42]
back to work downtown and more
[3:32:43]
employees come to work more days of the
[3:32:44]
week. That continues to grow. Rail
[3:32:47]
right now continues to lag, we are
[3:32:53]
working on a number of projects to
[3:32:54]
improve that experience for folks, we
[3:32:57]
hope to see an improvement as the year
[3:33:02]
continues this calendar year. Next
[3:33:05]
slide. Digging into more detail, our
[3:33:11]
on-time performance was good. I want to
[3:33:15]
say I'm very proud of our bus
[3:33:18]
operations staff. This is the first
[3:33:19]
time on-time performance has hit 80
[3:33:23]
percent on the local bus since we moved
[3:33:27]
to account every point by the second
[3:33:31]
system 20 years ago. That is a huge
[3:33:34]
achievement and that goes to the work
[3:33:37]
we are doing in many areas of bus
[3:33:41]
operations. That's not just one group
[3:33:42]
that's from the scheduling team
[3:33:43]
supervision team on the street. Bus
[3:33:47]
control who is monitoring the service
[3:33:51]
in real time, we have standby buses to
[3:33:52]
step in when things don't go as planned
[3:33:54]
to keep the service moving as well as
[3:33:58]
communication team to alert customers
[3:34:01]
what's going on to make sure we can get
[3:34:02]
everybody where they need to go as
[3:34:06]
quickly as possible. Very proud of the
[3:34:07]
effort the team has done, I'd be remiss
[3:34:09]
if I did not point that out. We
[3:34:16]
continue to increase our passenger
[3:34:17]
counts year-over-year for the month of
[3:34:20]
December. Park and ride similar trends.
[3:34:24]
Good on-time performance since we made
[3:34:26]
that change in the fall and early
[3:34:31]
winter. We adjusted some deadhead times
[3:34:34]
as TxDOT took some roadway capacity out
[3:34:38]
of the freeway, we adjust how buses get
[3:34:39]
in and out of downtown to improve
[3:34:42]
on-time performance. That has studied
[3:34:45]
our decline and we are pleased with
[3:34:49]
those results. The park and ride
[3:34:52]
ridership rebounds strongly month over
[3:34:53]
month compared to last year. Mean
[3:35:01]
distance between failures the team is
[3:35:02]
doing a good job keeping the service on
[3:35:04]
the street. They look for ways to
[3:35:06]
improve pullout. The new buses roll in.
[3:35:11]
They have been excellent for the most
[3:35:13]
part as they hit the street the
[3:35:18]
customers appreciate that. The
[3:35:19]
operators like the new bells and
[3:35:23]
whistles and everything on there as
[3:35:27]
opposed everybody appreciates driving a
[3:35:28]
new vehicle as opposed to a 14-year-old
[3:35:31]
vehicle. That is very positive and
[3:35:32]
everybody is responding well to that.
[3:35:36]
And the reliability has been good as
[3:35:37]
well as you see from the statistics.
[3:35:45]
Rail performance we've continued our
[3:35:46]
improvements on the red line in terms
[3:35:49]
of on-time performance after we have
[3:35:50]
those changes made to the signal in
[3:35:53]
September and October. We are back up
[3:35:57]
to our 93 percent goal on the red line
[3:36:00]
and looking to make further
[3:36:04]
improvements to that. As I mentioned,
[3:36:05]
we continue to see the same 15 to 18
[3:36:10]
percent decline month over month on the
[3:36:14]
red line this year. We're working on
[3:36:16]
that companywide to reverse the trend.
[3:36:20]
Next slide. Green and purple not as
[3:36:23]
pronounced as the red line. On-time
[3:36:26]
performance very strong on green and
[3:36:30]
purple. The ridership is down slightly.
[3:36:34]
Not as much as red. And we are hoping
[3:36:39]
to double our efforts and improve that.
[3:36:47]
Next slide. Good reliability. We talked
[3:36:49]
for a number of months on the projects
[3:36:50]
we are doing in real maintenance to get
[3:36:53]
the cars retrofitted and cleaned up,
[3:36:56]
get improvements made to them in a
[3:37:01]
number of areas. We are starting to
[3:37:02]
show signs of good on-time good
[3:37:05]
reliability with the vehicles as we
[3:37:12]
move forward. Next slide. METROLift
[3:37:14]
performance again I could not be
[3:37:19]
happier. We had a little blip on
[3:37:23]
on-time performance last month. We
[3:37:24]
spend a lot of time talking about the
[3:37:27]
fare system. We have introduced a new
[3:37:28]
way for people to book their rides on
[3:37:33]
METROLift as well as how we schedule it
[3:37:35]
and dispatch them using the new app it
[3:37:39]
has taken a lot of people a lot of
[3:37:43]
effort and over time call volumes went
[3:37:44]
up with questions about the system the
[3:37:46]
length of time it takes to handle folks
[3:37:48]
go up those numbers are coming down and
[3:37:52]
we start to get a handle on how to use
[3:37:57]
the system. Every time we make a change
[3:37:58]
throughout the day it recalculates the
[3:38:04]
optimum assignment of vehicles and trip
[3:38:07]
locations. We really expect to see
[3:38:10]
better customer experience moving
[3:38:13]
forward. We had our highest on-time
[3:38:15]
performance for METROLift last month.
[3:38:20]
As you can see the ridership continues
[3:38:22]
to steadily grow. Next slide. Good
[3:38:28]
reliability. Many vehicles have been
[3:38:29]
replaced in the last year and a half.
[3:38:34]
Are contractors do a good job of
[3:38:35]
maintaining them and keeping them on
[3:38:38]
the street. Our hot lanes all our
[3:38:47]
meeting the standards I think I will be
[3:38:48]
asking to make a presentation to give
[3:38:49]
you more detail. If you remember three
[3:38:55]
months ago we made some changes on the
[3:38:58]
59 North corridor as to when the toll
[3:39:03]
would be the highest and when we would
[3:39:11]
exclude non-HOV users from the lanes to
[3:39:12]
make sure we could get speeds up. We
[3:39:17]
want to come back and tell the story of
[3:39:18]
what we saw on how people have responded
[3:39:21]
and how speeds have improved and it's
[3:39:24]
flowing much better for the HOV and HOT
[3:39:26]
including the bus service in that
[3:39:29]
corridor. Very positive with all of our
[3:39:36]
speeds now. Next slide. I want to
[3:39:38]
highlight you heard from Russ about the
[3:39:40]
marketing communications slide of the
[3:39:41]
shutdowns we had in December. This is
[3:39:47]
very critical work for the rail it does
[3:39:54]
not just magically operate without a
[3:39:58]
whole lot of effort and maintenance
[3:39:59]
over time and it is quite exciting to
[3:40:03]
go out and see the fireworks going off
[3:40:07]
as they are grinding the rail the
[3:40:09]
picture second to the right someone is
[3:40:16]
grinding the rail and getting ready to
[3:40:18]
take it out you see on the far right
[3:40:24]
there welding it at a temperature you
[3:40:25]
don't want to go anywhere near and
[3:40:30]
making sure the two pieces of metal
[3:40:31]
rail can be bounded together and work
[3:40:34]
seamlessly and smoothly for customers.
[3:40:41]
You see a picture of what you don't see
[3:40:42]
on the bus side is service supervisors
[3:40:44]
out there manning the lines and
[3:40:48]
communicating with customers making
[3:40:49]
sure the bus service replacement
[3:40:53]
services working. Because the rail
[3:40:54]
shutdown doesn't mean people have a
[3:40:57]
place to go. I've got a picture the bus
[3:40:58]
going through the construction zone and
[3:41:00]
the picture to the far left, seeing the
[3:41:03]
amount they have to dig out. What this
[3:41:08]
work was, three of the four locations
[3:41:09]
where the rail line crosses they are
[3:41:15]
called diamonds. We replaced three of
[3:41:17]
the four diamonds in this four-day
[3:41:19]
work. You can see the amount of
[3:41:23]
concrete they have to jackhammer out,
[3:41:28]
saw cut the damaged part of the rail off
[3:41:32]
it's quite a lot of heavy dirty work.
[3:41:35]
We have done this in the dead of summer
[3:41:42]
when it's 100 degrees. We had our first
[3:41:43]
time replacement last year it was
[3:41:45]
hovering above freezing, about 38
[3:41:49]
degrees last year. It was more pleasant
[3:41:53]
temperature wise this year. Are
[3:41:54]
contractors and maintenance of way
[3:41:56]
crews are dedicated and do a dynamite
[3:42:00]
job. I want to give them props for what
[3:42:04]
they do every day and focus on the
[3:42:05]
importance of this kind of maintenance.
[3:42:08]
We replaced three of the four diamonds
[3:42:11]
this weekend. One of the welds you see
[3:42:14]
on the right if it is that particular
[3:42:18]
one, one of the welds did not work to
[3:42:21]
our satisfaction. It was showing signs
[3:42:25]
of weakness. We could of gotten a bad
[3:42:27]
batch of thermite, a number of things
[3:42:29]
could of cause that. We will be going
[3:42:32]
back in the next shutdown in February
[3:42:36]
to cut out that small piece of rail
[3:42:40]
input in a replacement. This is why we
[3:42:44]
do these things repeatedly. I know they
[3:42:45]
are a hassle nobody likes to show up.
[3:42:48]
They show up to the rail line and they
[3:42:49]
don't want to get on a bus. It's a lot
[3:42:52]
of work for customer service to answer
[3:42:55]
questions but it's so important to keep
[3:42:58]
the rail line running particularly when
[3:42:59]
we have major events like FIFA if we
[3:43:02]
wait until the last minute and the rail
[3:43:07]
line fails we have to continue to go
[3:43:08]
over this five miles an hour. If you
[3:43:10]
have written the rail line it can get
[3:43:13]
up to 35 or 40 miles per hour. Five
[3:43:16]
miles per hour is very slow. Noticeably
[3:43:22]
slow. So we are looking forward to
[3:43:23]
getting this last one fixed and
[3:43:25]
hopefully getting better welds out
[3:43:28]
there as we look for ways to improve
[3:43:31]
our service and make sure it's
[3:43:35]
top-notch for users. I'm happy to
[3:43:36]
answer any questions
[3:43:37]
>> That is our report
[3:43:41]
>> Thank you for that update. Also
[3:43:44]
thank you for your coordination. I know
[3:43:46]
there is a lot of events and activity
[3:43:51]
you have to coordinate around to do the
[3:43:54]
work. Also doing it in advance of
[3:43:58]
events upcoming so thank you
[3:44:03]
>> Any other questions or comments from
[3:44:07]
board members? Allow me to say thank
[3:44:09]
you to the board members in attendance
[3:44:13]
to the meeting. Mayor Fry had to leave
[3:44:14]
early but he began with us thank you
[3:44:18]
board member Ponce Board member
[3:44:19]
Vilaseca Board Member Han to our Chair
[3:44:21]
and interim president and CEO the time
[3:44:28]
is 12:48 PM and this concludes the
[3:44:30]
customer experience operation business
[3:44:31]
development committee meeting
[3:44:33]
>> Good afternoon we are beginning our
[3:44:53]
public safety committee meeting. The
[3:44:56]
time is 1248 are there any public
[3:44:57]
comments
[3:45:00]
>> One, Dominic Maisoc
[3:45:04]
>> Reverend can you hear me? Yes I hear
[3:45:09]
you loud and clear. You can start my
[3:45:11]
180. I want to make a comment about
[3:45:18]
those four diamonds at Central Station
[3:45:22]
Junction area. My read of this is those
[3:45:30]
rails highly specialized crossing, not
[3:45:31]
only do you have the gutter for the
[3:45:37]
light rail, those look like very
[3:45:46]
expensive pieces of track. I don't mind
[3:45:47]
the LRT cars crossing those diamonds at
[3:45:50]
slow speed so we get much life as we
[3:45:54]
can. Chief, I appreciate you and I
[3:46:04]
appreciate Tom Jasien. If I see a
[3:46:08]
problem I text you. I appreciate that
[3:46:14]
one-on-one information or conversation
[3:46:16]
we are having. One thing though and I
[3:46:19]
saw something the other day it was
[3:46:22]
yesterday. At the city Council meeting
[3:46:25]
I went down to the [Indiscernible] to
[3:46:28]
eat which is main and capital. I come
[3:46:35]
out at 730. One thing I am noticing is
[3:46:38]
as the sun is going down, all of the
[3:46:46]
homeless come out. Again, this is a
[3:46:51]
situation, not just METRO or METRO PD
[3:46:54]
problem, this is a citywide problem. It
[3:47:03]
seems like and I've noticed several
[3:47:04]
times I've been in the downtown area,
[3:47:05]
people are using the red line
[3:47:12]
[Indiscernible] my observations have
[3:47:13]
been on the red line of course, people
[3:47:19]
use the transit facilities as shelters.
[3:47:26]
There's also problems at the
[3:47:27]
[Indiscernible] station on the red
[3:47:29]
line. I think there may be a solution
[3:47:31]
chief and this is in terms of Moody
[3:47:35]
Park. I noticed the Harris County
[3:47:40]
sheriff's office is watching the red
[3:47:44]
line north to Northline I think the
[3:47:45]
Houston city Council has approved
[3:47:50]
having Moody Park being under the watch
[3:47:51]
of the Harris County Parks Department
[3:47:57]
and that might be an incentive for
[3:47:59]
Harris County sheriffs to Park and
[3:48:03]
watch stuff at the park as well as
[3:48:07]
using the restroom I know there are
[3:48:10]
restrooms at Moody Park that also gives
[3:48:15]
us an opportunity to leverage that to
[3:48:20]
also watching the park and the red
[3:48:23]
line. I have those on the north end and
[3:48:27]
it's not as many people it it could be
[3:48:34]
the homeless situation could be our
[3:48:35]
customer base is moving somewhere else
[3:48:40]
because on [Indiscernible] that line is
[3:48:45]
booming. Then 96 which I ride to the
[3:48:47]
rail is booming. So I don't know,
[3:48:52]
lastly I was talking about the
[3:48:54]
[Indiscernible] I think part of the
[3:48:55]
thing is you need to get part of your
[3:49:01]
team a part of METRO staff and riders
[3:49:07]
like myself we need to form a task
[3:49:09]
force and see what we can do with
[3:49:14]
making fares better, better enforcement
[3:49:19]
other things. Link Houston is a good
[3:49:21]
idea but there are other people that
[3:49:25]
ride the system. You have 30 seconds.
[3:49:31]
All riders from all parts of the system
[3:49:39]
on all forms of the system and maybe
[3:49:40]
together we can come up with ideas for
[3:49:41]
safety and improving enforcement of the
[3:49:42]
rules of the system I have no other
[3:49:43]
comments back to you Reverend
[3:49:49]
>> Thank you Mr. Meisel that concludes
[3:49:51]
the public comments. At this time we
[3:49:55]
will have opening public safety message
[3:49:59]
to promote safety awareness. Santiago
[3:50:01]
Osorio
[3:50:02]
>> Thank you members of the committee
[3:50:06]
good afternoon. This month we are
[3:50:07]
serving national human traffic
[3:50:10]
intervention month. January is the
[3:50:11]
month to focus on human trafficking at
[3:50:14]
METRO the safety of riders is a top
[3:50:17]
priority. During this month we
[3:50:18]
encourage the community to stay alert
[3:50:21]
and look out while using the transit
[3:50:23]
system human trafficking can occur
[3:50:25]
anywhere including the public system.
[3:50:28]
Being aware can save lives. If you
[3:50:32]
notice anyone that seems suspicious
[3:50:36]
trust your instincts. Signs of
[3:50:37]
trafficking include being aware of
[3:50:40]
location suspicious behavior and
[3:50:43]
activities see or take a look at
[3:50:46]
customer that are unable to speak for
[3:50:48]
themselves, that they look like they
[3:50:54]
are out of place, if they are fearful
[3:50:55]
of control by another person. Contact
[3:50:57]
the police department and make a
[3:51:01]
report. Police Department has a 24 hour
[3:51:05]
hotline, also a direct line at
[3:51:10]
713-224-2677. Were reported to one of
[3:51:14]
the transit employees you can also
[3:51:17]
contact the human traffic hotline at
[3:51:20]
1-888-373-7888. Your awareness can make
[3:51:24]
a difference together we can keep
[3:51:26]
transit safe thank you
[3:51:28]
>> Thank you so much for that public
[3:51:34]
safety message. I'd like to take an
[3:51:38]
opportunity to say in December 2025 we
[3:51:40]
we're excited about coming into a new
[3:51:44]
year we made it to January 2026 with
[3:51:49]
excitement and expectation the amazing
[3:51:50]
thing has happened this month, we've
[3:51:53]
been faced with an unexpected shooting.
[3:51:56]
I believe as an agency, everything we
[3:52:01]
can do to place safety measures in
[3:52:03]
place is a very important. We have a
[3:52:09]
wonderful METRO police team. I want to
[3:52:10]
say thank you for all you do. Thank you
[3:52:15]
for what you are doing and we respect
[3:52:16]
the fact that your lives are on the
[3:52:19]
line for us. We will move now to the
[3:52:24]
action item number three. Mr. Domingo
[3:52:29]
[Indiscernible]
[3:52:33]
>> The purpose of this is to implement
[3:52:38]
unarmed security guard services across
[3:52:39]
all METRO properties facilities and
[3:52:43]
parking areas. The services will
[3:52:45]
include served and response
[3:52:46]
capabilities to support special events
[3:52:49]
and emergencies. I'm requesting
[3:52:54]
authorization Interim President CEO to
[3:52:55]
execute a three-year contract with two
[3:52:56]
one-year options with InterCon Security
[3:52:58]
systems from armed security services
[3:52:59]
for a maximum contract amount not to
[3:53:08]
exceed $49 million. InterCon Security
[3:53:13]
has committed to 20 percent small
[3:53:14]
business participation by utilizing
[3:53:17]
patrol division LLC the contract
[3:53:21]
effective April 15, 2026 funding is
[3:53:22]
included in the FY 26 operating budget
[3:53:25]
>> Are there any questions?
[3:53:28]
>> Board Member Han
[3:53:32]
>> Do we have something similar to this
[3:53:35]
contract this upcoming contract now? is
[3:53:43]
this something we do have or is that a
[3:53:44]
new contract we are going to have
[3:53:45]
>> Is a little bit of both. We
[3:53:46]
currently have a contract although the
[3:53:50]
new contract is different than the
[3:53:51]
current contract
[3:53:54]
>> In size and scope
[3:53:57]
>> So right now we do have something
[3:53:58]
similar but it's a different than the
[3:54:03]
new contract we will have
[3:54:04]
>> We have an unarmed contract
[3:54:07]
currently but the scope of work for the
[3:54:11]
existing contract is very different
[3:54:14]
than what is proposed
[3:54:15]
>> Would you explain the difference so
[3:54:17]
folks are aware
[3:54:22]
>> The existing requirement is for the
[3:54:25]
security guard force more entry-level
[3:54:30]
than the current contract. The proposed
[3:54:31]
contract requires a higher security
[3:54:33]
license a level II license from the
[3:54:37]
state. The proposed contract will
[3:54:41]
require level II license. The uniforms
[3:54:43]
equipment training and background
[3:54:44]
requirements for personnel will be
[3:54:47]
different as well as an increased
[3:54:48]
presence with the new contract staffing
[3:54:56]
certain posts that don't currently exist
[3:54:57]
>> So besides the higher level of the
[3:54:58]
security force in the new contract, as
[3:55:02]
a member of unarmed security force do
[3:55:09]
we have many more guards in the new
[3:55:10]
contract compared to the older one
[3:55:13]
>> Yes. The hourly increase will be
[3:55:18]
approximately 1000 hours weekly. The
[3:55:20]
coverage will expand. We have
[3:55:25]
approximately 80 guard force personnel
[3:55:26]
that will increase to 120
[3:55:28]
>> Alright thank you
[3:55:35]
>> Any other questions? Thank you so
[3:55:36]
much we will move the item forward.
[3:55:43]
>> We will proceed with the briefings
[3:55:47]
the monthly police and security report
[3:55:52]
Chief Ban Tien police and security
[3:55:53]
update
[3:55:54]
>> Good morning good afternoon Board of
[3:56:01]
Directors and Mr. Jasien this will be
[3:56:02]
our public safety briefing for
[3:56:07]
December. The key take away is we
[3:56:13]
engaged our metrics based on major
[3:56:16]
Groups. offenses a are more serious
[3:56:19]
and b less serious since the beginning
[3:56:21]
of the fiscal year we have seen a good
[3:56:27]
trend trending down and we would like
[3:56:28]
to continue to maintain the trend.
[3:56:37]
[Indiscernible] incident I want to
[3:56:38]
highlight the fact that our two biggest
[3:56:40]
location problem locations are the bus
[3:56:44]
stop and bus shelters. And the LRV
[3:56:47]
platform the simple fact that we do
[3:56:48]
share the space like any major city
[3:56:51]
with the city of Houston and try to
[3:56:52]
prevent as much as we can the reality
[3:56:57]
is we are reflection of the city
[3:56:58]
because we share the space
[3:57:06]
[Indiscernible] biggest problems
[3:57:07]
because of that we are serving a lot of
[3:57:09]
resources at those locations
[3:57:13]
enforcement, we have seen
[3:57:14]
[Indiscernible] with those contact with
[3:57:16]
individuals being rude or misbehaved
[3:57:18]
and we have seen a trend to reduce
[3:57:27]
enforcement slightly perhaps it is a
[3:57:28]
coordination with the surge we have
[3:57:29]
been a safety initiative in the last
[3:57:31]
couple of months. We want to focus on
[3:57:35]
the most important thing to react and
[3:57:36]
have a huge impact on. It's basically
[3:57:43]
assault cases we have on the assault
[3:57:45]
type we break into three types the most
[3:57:47]
serious aggravated assault simple
[3:57:49]
assault and intimidation we see a
[3:57:51]
slight uptick on assault in the month
[3:57:54]
of December and compared to November
[3:57:57]
aggravated assault and simple assault
[3:58:03]
with intimidation pretty flat. Fare
[3:58:06]
citation thanks to the new system we
[3:58:10]
implemented we almost slightly doubled
[3:58:16]
the enforcement and we continue
[3:58:20]
it takes a while for folks to get use
[3:58:22]
to a system to make sure they get use
[3:58:25]
to it and we will take more enforcement
[3:58:26]
action as we move forward. Our care
[3:58:37]
[Indiscernible] regular basis to come
[3:58:38]
in contact with the homeless population
[3:58:41]
to provide a service and offer service
[3:58:43]
they need in comparison to November and
[3:58:46]
December we increased our contact to
[3:58:51]
600. The harsh reality is the fact that
[3:58:54]
if you look at to the right of that
[3:59:01]
half of the close to half of them stay
[3:59:05]
with [Indiscernible] and some of them
[3:59:06]
take contact over and over but they
[3:59:08]
also [Indiscernible] most of the time
[3:59:11]
if we put enough emphasis and
[3:59:16]
engagement for those individuals some
[3:59:17]
of those seek resources for help.
[3:59:20]
Perhaps there is no true metrics to
[3:59:24]
gauge that but some of the success
[3:59:29]
officers can provide individual and
[3:59:37]
most of them have individual stories a
[3:59:38]
lot of them have a tragic story and the
[3:59:39]
reality is we get them to a place they
[3:59:40]
need to go because if they stay out
[3:59:41]
there it will be a tragic at the end of
[3:59:43]
the day. These are major arrests I want
[3:59:46]
to continue to paint the picture and
[3:59:50]
frame the graph to the picture to the
[3:59:55]
right. This is our heat map imagine the
[4:00:00]
vast space we have in the METRO area
[4:00:01]
responsibility over 1300 square miles
[4:00:04]
four counties among them 14 cities. Most
[4:00:11]
of our location of the incidences
[4:00:14]
basically cluster around the middle in
[4:00:15]
close proximity to the red line. The
[4:00:17]
reason for that is most of the riders
[4:00:21]
biggest ridership using the system
[4:00:22]
throughout the red line train in
[4:00:26]
downtown. The truth is it spreads out
[4:00:30]
all over the city so MPD for a small
[4:00:31]
department we have a lot of space to
[4:00:37]
cover. Next slide. Here are a couple a
[4:00:41]
significant arrests we made. I want to
[4:00:48]
highlight this one being the fact I
[4:00:49]
wanted to telegraph to the bad guys we
[4:00:50]
are out there patrolling bus stops and
[4:00:51]
bus routes. Because of that it led to
[4:00:53]
this arrest and narcotics related crime
[4:00:57]
suppression officers patrolling the
[4:01:00]
areas. I want to put a public safety
[4:01:02]
message. We do put some time presence
[4:01:06]
on those buses and bus routes and they
[4:01:11]
are often have plainclothes routes as
[4:01:17]
well. I want to highlight this because
[4:01:19]
of the collaboration with the law
[4:01:22]
enforcement agency. Is stemmed from an
[4:01:27]
disturbance on the bus and by the time
[4:01:28]
the officer got there the suspect had
[4:01:30]
left the scene because of the way we
[4:01:34]
communicate in this case with Houston
[4:01:37]
PD we were able to track the suspect
[4:01:38]
down the road he was involved in a
[4:01:39]
shooting that weapon was recovered I
[4:01:43]
can only imagine without the
[4:01:46]
collaboration and we did not apprehend
[4:01:48]
the suspect that they often like any
[4:01:55]
big city we absolutely don't have the
[4:01:57]
ability or resources to impact and
[4:01:59]
prevent every crime but the key of how
[4:02:01]
we respond that is going to be key
[4:02:10]
meaning the fact that in order for us
[4:02:11]
to do that we rely on collaboration
[4:02:12]
technology and most importantly the
[4:02:13]
people that committed out there not
[4:02:14]
just to go to a scene but go beyond the
[4:02:18]
call and that's what I call commitment.
[4:02:22]
This is a snapshot of what we gauge. We
[4:02:27]
call it a group a crime in the state
[4:02:32]
standard meaning a more serious crime.
[4:02:36]
I want to frame this in perspective
[4:02:38]
meaning the fact that earlier slide use
[4:02:45]
all the heat map. The take away from
[4:02:49]
this is roughly in the month of
[4:02:52]
December we have approximately over 5.9
[4:02:54]
million riders. The serious crime we
[4:03:01]
are tracking 122. For every 100,000
[4:03:02]
riders we have for the month, to our
[4:03:05]
impacted. The statement is so true one
[4:03:09]
crime is too many regardless the end
[4:03:14]
state outcome of the crime one crime
[4:03:15]
is too many as I mentioned earlier my
[4:03:22]
department cannot prevent everything
[4:03:23]
and anything but we can continue to
[4:03:26]
identify hotspots served those
[4:03:27]
resources for collaboration and
[4:03:30]
partners since November thank to board
[4:03:31]
approval for the initiative we have we
[4:03:34]
put outside agency the system during
[4:03:39]
peak time. We continue to assess and
[4:03:42]
evaluate hotspots and continue to
[4:03:43]
expand those areas of coverage. In the
[4:03:49]
interim we also operations have
[4:03:50]
invested in a lot of new technology. We
[4:03:56]
telegraph our capability but we do rely
[4:03:57]
on technology to solve crimes. Are
[4:04:00]
there any questions this is all I have
[4:04:02]
>> Are there any questions?
[4:04:09]
>> I just want to echo the comments of
[4:04:13]
Chair Preston. I appreciate all the
[4:04:15]
work you do and certainly in making
[4:04:20]
sure we hold people accountable when
[4:04:22]
they ride our system and they are not
[4:04:28]
behaving. It's making sure we want to
[4:04:31]
make sure we have the proper resources
[4:04:32]
you need to get your job done. We want
[4:04:35]
to thank you and law enforcement for
[4:04:39]
making sure folks are safe so thank you
[4:04:41]
>> I do want to echo the comment that
[4:04:45]
is so true since I've been here
[4:04:51]
basically I've been told and I welcome
[4:04:54]
that chief to the best of our ability
[4:04:57]
we give you the resources to do your
[4:04:58]
job but we will hold you accountable
[4:05:00]
this is the reason we expand our
[4:05:03]
footprint decentralize the location
[4:05:09]
putting key storefront type or
[4:05:11]
substation most impactful to a
[4:05:12]
particular location and more strategic
[4:05:19]
and also given the resources and I
[4:05:20]
don't want to over telegraph a new
[4:05:21]
capability will come to us in the next
[4:05:22]
few months, the mobile station to take
[4:05:24]
resources where it's most needed on top
[4:05:29]
of that the expansion increased hiring
[4:05:31]
of the police officers I have to
[4:05:32]
appreciate every bit of that but that
[4:05:35]
is a true statement you should hold me
[4:05:40]
accountable for every single individual
[4:05:41]
that wears this uniform accountable
[4:05:46]
>> Board member Vilaseca
[4:05:48]
>> I also wanted to thank you and the
[4:05:51]
team for doing the work every day and
[4:05:56]
going above and beyond. It's a
[4:05:58]
difficult situation when these tragic
[4:06:03]
events,. I did talk to Tom earlier this
[4:06:04]
week about making sure if there's
[4:06:06]
anything I or we can do to support your
[4:06:14]
staff operators witnesses with
[4:06:15]
psychological and emotional support and
[4:06:16]
well-being given these different
[4:06:21]
experiences. I know you are going to
[4:06:22]
circle back around with me but I want
[4:06:24]
to voice public support of that, being
[4:06:28]
sensitive to those needs
[4:06:29]
>> Thank you so much man
[4:06:34]
>> Board member Ponce
[4:06:36]
>> Reverend Preston is looking at me
[4:06:40]
over there. I echo the same sentiments.
[4:06:44]
As you were speaking sir I was thinking
[4:06:49]
about not just taking these folks out
[4:06:53]
of our buses but the folks that make it
[4:06:54]
into our buses and rails that don't get
[4:06:59]
caught, they go into other
[4:07:02]
neighborhoods and commit crime. The
[4:07:03]
work that you and your staff are doing
[4:07:09]
our significant to keeping our
[4:07:13]
customers and staff save. Not just them
[4:07:14]
but the communities they are going into
[4:07:20]
as well. I think other law enforcement
[4:07:24]
agencies are thankful for the work
[4:07:25]
METRO PD is doing as well so thank you
[4:07:28]
very much. After this I would like to
[4:07:29]
circle back on item 3 if that's okay
[4:07:31]
with the board
[4:07:33]
>> I want to capture that moment. I
[4:07:36]
think your assessment is 100 percent
[4:07:41]
accurate. Bad guys now days there is no
[4:07:43]
jurisdictional boundaries they go where
[4:07:44]
they go some of our initiatives called
[4:07:47]
displacement we do our best with the
[4:07:51]
collaboration the case we talked about
[4:07:55]
this is the key we go and respond to
[4:08:00]
the call and not collaborate with
[4:08:01]
partners I can only imagine what the
[4:08:02]
individual is going to do throughout
[4:08:04]
the day not just on our system but in
[4:08:05]
the city of Houston so thank you sir
[4:08:10]
>> Thank you for your comments I'm
[4:08:13]
going to take a point here just before
[4:08:16]
moving to our next item we will circle
[4:08:19]
back on item number three board member
[4:08:23]
Ponce
[4:08:24]
>> Thank you Reverend Preston. Summit
[4:08:33]
gave me the idea and I started thinking
[4:08:34]
about this item a little more regarding
[4:08:38]
the unarmed security guard services. I
[4:08:41]
wanted to get a better idea as to how
[4:08:44]
that is going to impact the METRO PD
[4:08:49]
work as well. When I think about it
[4:08:52]
putting more security officers there we
[4:08:59]
can think about it where we can get
[4:09:01]
more METRO PD officers to those high
[4:09:06]
crime areas and then focus these
[4:09:08]
security officers in those low income
[4:09:11]
areas is that the idea here?
[4:09:14]
>> To piggyback on your question, it
[4:09:17]
would be good to understand the
[4:09:22]
coordination between the two and where
[4:09:25]
they complement each other
[4:09:29]
>> If I can I will ask Santiago and
[4:09:31]
Chief Tien to respond
[4:09:36]
>> Thank you. To answer the question
[4:09:40]
I'm going to start off by saying the
[4:09:41]
coordination within PD we are our goal
[4:09:47]
we understand that guards are not
[4:09:49]
licensed police officers and therefore
[4:09:50]
they serve a different purpose we do
[4:09:59]
have a lot of areas candidate for their
[4:10:00]
services and we intend to place them in
[4:10:01]
areas where currently MPD is occupying
[4:10:04]
space where they can be free and be
[4:10:08]
re-assigned to areas the chief is in
[4:10:09]
more need of it those areas we can
[4:10:12]
coordinate once we get more into the
[4:10:17]
details of the contract so that there's
[4:10:18]
a big coordination related to transit
[4:10:19]
centers we are staffed within PD areas
[4:10:24]
that security guards can take over to
[4:10:25]
give a quick example most recently with
[4:10:26]
a fare the new fare media initially it
[4:10:32]
was a sign of task to have officers at
[4:10:37]
those location but through the contract
[4:10:40]
we shifted guards to the little fare
[4:10:42]
ride stores in order for them to be
[4:10:45]
tied into the eight hour shift there.
[4:10:49]
Being able to be deployed to buses or
[4:10:51]
trains the coordination is there.
[4:10:55]
Further we can only have areas where we
[4:10:56]
have no other than cameras. We
[4:11:01]
will be deploying guards more on a
[4:11:02]
regular basis where we have knowledge
[4:11:05]
where there is vandalism or auto theft.
[4:11:09]
Things like that that criminals don't
[4:11:11]
care if they see a guard or officer,
[4:11:16]
they see someone there they figure it's
[4:11:17]
better to go somewhere else. He that is
[4:11:22]
the goal behind the expanded security
[4:11:25]
guard contract. I hope I answered your
[4:11:26]
questions
[4:11:29]
>> I think it's an excellent idea. Is
[4:11:32]
an efficient use of resources. I'm on
[4:11:36]
board for this one
[4:11:39]
>> Chief Tien do you want to weigh in
[4:11:44]
>> Yes, sir. I see the guard as a
[4:11:49]
deterrent and somewhat to a large
[4:11:50]
degree a prevention to have their
[4:11:52]
presence. By having them in fixed post
[4:11:54]
facility type allows to free up and MPD
[4:11:59]
officer to take enforcement actions.
[4:12:04]
From the police side I welcome all the
[4:12:07]
help, even to the speakers we kicked
[4:12:12]
off the committee meeting made it a
[4:12:13]
fact that the relationship helps they
[4:12:17]
tell us exactly what our problems are
[4:12:18]
and where we need to go because we have
[4:12:23]
the ability to mobilize to address a
[4:12:27]
location where they are. Having
[4:12:28]
additional resources will free up my
[4:12:33]
resources to move elsewhere. With
[4:12:34]
expansion I need all the help because
[4:12:38]
by adding new facility I need officers
[4:12:41]
patrol to enforce so I welcome all the
[4:12:42]
help
[4:12:49]
>> Thank you I have one question
[4:12:50]
whether or not we will be deploying if
[4:12:57]
you are able to share some of these
[4:12:58]
guards onto the bus routes or trains
[4:12:59]
will they supplement current presence
[4:13:03]
there or I'm curious to hear the extent
[4:13:06]
you can share
[4:13:07]
>> To the buses themselves we have had
[4:13:12]
discussions where it's more suitable
[4:13:13]
for law enforcement to ride buses but
[4:13:20]
to the transit centers where we get
[4:13:21]
bulk of customers to interact with
[4:13:22]
buses and yes there are transit centers
[4:13:23]
identified that are heavy ridership
[4:13:30]
like TMC Wheeler we have other centers
[4:13:31]
where guards will have a lot of
[4:13:33]
presence. If there's coordination with
[4:13:37]
the chief and special initiatives we
[4:13:38]
will be adding more guards with law
[4:13:43]
enforcement that's a possibility. We
[4:13:44]
are open for those conversations
[4:13:49]
>> Most of the resource will be
[4:13:50]
anchored on a fixed post type when you
[4:13:53]
move out to maneuver and take actions I
[4:13:56]
want my police officers out there. I
[4:14:00]
just mention stuff will happen sometimes
[4:14:09]
we cannot control what happens but how
[4:14:10]
we respond is key by having arm to
[4:14:11]
police officers out there it will be
[4:14:12]
key. I don't believe the guard is here
[4:14:16]
to replace MPD they just augment and
[4:14:17]
support
[4:14:19]
>> I have another question. These
[4:14:30]
officers security guards are they going
[4:14:35]
to be mobile so they are circulating
[4:14:37]
around locations rather than having a
[4:14:40]
fixed post
[4:14:41]
>> There's a portion of the contract
[4:14:43]
that is identified to have mobile units
[4:14:47]
currently we have one so we are moving
[4:14:51]
up to 10 maybe 15 meaning vehicles they
[4:14:53]
can go from one transit center to
[4:14:57]
another. There's an opportunity in
[4:14:58]
[Indiscernible] and Spring Park and
[4:15:02]
ride. Those are within three miles of
[4:15:07]
each other and it's a perfect scenario
[4:15:08]
for someone to move back and forth and
[4:15:09]
show presence at any given time. So we
[4:15:11]
have that ability
[4:15:12]
>> Thank you
[4:15:13]
>> Any other questions or comments?
[4:15:17]
Thank you we will move the item forward.
[4:15:24]
We'll move to the next briefing the
[4:15:25]
monthly bus and rail safety report.
[4:15:30]
Mohammed
[4:15:34]
>> Good afternoon everybody. As part of
[4:15:35]
the regular safety report I will provide
[4:15:42]
safety performance for the month of
[4:15:43]
December 2025 for rail bus and
[4:15:46]
paratransit focusing on collisions and
[4:15:50]
safety actions underway. We will start
[4:15:54]
with the bus operations. We experience
[4:15:55]
the month of December 21 collisions.
[4:15:59]
That is below the benchmark of 22. This
[4:16:03]
is the second consecutive month we
[4:16:07]
remain under target. Some of the things
[4:16:09]
we are doing we continue to monitor
[4:16:13]
every event that occurs. Investigated
[4:16:15]
to the extent possible in generating
[4:16:19]
corrective actions as needed. We have
[4:16:20]
training programs and initiatives
[4:16:21]
underway such as the procurement of the
[4:16:27]
bus training simulator. On the rail
[4:16:31]
side, happy to report we met our
[4:16:36]
benchmark and we ended the month with
[4:16:38]
three reportable collisions the
[4:16:40]
benchmark was nine so this is the third
[4:16:41]
month we came below target which is
[4:16:49]
encouraging. Real collisions tend to be
[4:16:52]
closely monitored system wide programs
[4:16:57]
in place. I'd like to thank Chief Tien
[4:17:00]
for his enforcement actions, traffic
[4:17:04]
engagement, it's been happening for a
[4:17:05]
few months and I believe this has
[4:17:07]
helped with driving numbers where we
[4:17:11]
are now. Paratransit side of the house,
[4:17:15]
December showed three board collisions
[4:17:19]
that was the benchmark so we met the
[4:17:24]
benchmark for the service. These events
[4:17:25]
are reviewed as part of the ongoing
[4:17:27]
safety oversight of the service
[4:17:30]
providers. Overall this year has been
[4:17:34]
so far looking promising. Our annual
[4:17:38]
members target toward [Indiscernible]
[4:17:39]
looks to be either at or below the
[4:17:43]
target and we will continue actions and
[4:17:45]
activities and keep you updated on all
[4:17:51]
the initiatives underway, technology
[4:17:53]
initiatives and pilot program we are in
[4:18:00]
the process. Are there any questions or
[4:18:01]
comments?
[4:18:04]
>> Thank you so much for your briefing
[4:18:11]
>> The current time now is 1:21 PM and
[4:18:16]
this concludes our public safety
[4:18:23]
committee meeting.