>> Okay. All right. This is the 18th of August. It is
[0:18]
approximately 530 in the evening. We are here for
[0:27]
BA26-010C. An application by persons first Incorporated.
[0:31]
Actually, it's by Miss Kenisha Martin, who's trading as
[0:35]
Persons First Incorporated. It's a request for a
[0:39]
conditional use for a child care facility. Comma daycare,
[0:44]
treatment and care facility. And Miss Martin, we are here at
[0:48]
your request. It is your case. And so since you're going to be
[0:52]
the only witness tonight. I need to swear you in. Sure.
[0:57]
Thank you. Do you solemnly swear or affirm under the
[1:00]
penalty of perjury, that the responses given in statements
[1:02]
made shall be the truth, the whole truth, and nothing but
[1:05]
the truth? >> Yes.
[1:07]
>> Thank you. Please state your name and business address for
[1:09]
the record. >> Sure. Kenisha. Martin.
[1:13]
Business address is 164295 freeway, Miss Bowie, Maryland.
[1:18]
>> All right. Thank you. All right. It is your case. It is
[1:21]
your burden of proving that you meet all the requirements for
[1:27]
the proposed use. So I'm going to let you just go and tell me
[1:32]
how you meet all of the required criteria.
[1:37]
>> Sure. So we have gone through the necessary steps for
[1:40]
the conditional use process. This is our last last phase. We
[1:44]
have given the narrative for the program that we're going to
[1:48]
be operating. And Saint John's Lane.
[1:52]
>> There there lies my first question. How many students are
[1:57]
requested? >> Sure. Approximately 30.
[2:00]
>> 30. Okay. So I have to set a number. So 30 a maximum of 30.
[2:09]
>> Well, we can if there's room for. We certainly have room for
[2:12]
more. So. But we typically go by projected numbers of who we
[2:17]
think will support. But we can increase the number if there's
[2:20]
need, we can go over that number by maybe 40, 40.
[2:25]
>> Okay. Because your petition all states in terms of three
[2:29]
classrooms, well, three classrooms doesn't tell me how
[2:32]
many students you're proposing. So I have to set the number.
[2:36]
>> No, that makes sense. So the three class. So two of the
[2:39]
three will be utilized for the actual students. One will be a
[2:42]
conference room. So it's one conference room for maintenance
[2:44]
to make sure that we have confidentiality. And then two
[2:47]
for where the actual program will be operated.
[2:50]
>> So you think that each classroom can accommodate 20
[2:54]
students at a time. >> Absolutely.
[2:55]
>> All right. So you're asking for 4040 students. Okay. All
[2:59]
right. Okay. I'm sorry to interrupt you. Go ahead.
[3:02]
>> Sure. So the space will be utilized to support persons.
[3:07]
The population that we will support is persons that have
[3:11]
developmental disabilities and who may be on the autism
[3:15]
spectrum. Our goal or aim is to provide a structured day for
[3:19]
each person that will support them with having their skills
[3:24]
met. So for example, learning life skills, educational
[3:27]
purposes will also be tailored. So we have some classes for
[3:30]
that. We'll also be helping with employment. So the
[3:33]
classroom may have we may have laptops and different things
[3:36]
that will assist each person with being able to look for
[3:40]
employment and so forth. >> All right. So you're leading
[3:42]
me to my next question, which is what is the age of your
[3:48]
proposed clients? 20. >> Sure. 21 and older.
[3:52]
>> 21 and older. Okay. Thank you. Thank you.
[3:57]
>> Gotcha. So we can continue. Okay. And so the day that we'll
[4:02]
have within each within the center where we'll be, we'll
[4:06]
also have some community based opportunities. So we'll be
[4:08]
volunteering as well in different establishments. So
[4:12]
we'll be in and out of the building. We won't spend our
[4:14]
entire days there, although if the weather permits doesn't
[4:17]
permit, we may be indoors throughout the duration of our
[4:20]
time. Besides that, we also will have a few of our staff.
[4:26]
So for example, some persons may be approved through the
[4:29]
state for 1 to 1 staffing ratios. So we'll have staff
[4:32]
members who will be there to make sure that each persons
[4:35]
within their appropriate staffing ratios. We will.
[4:39]
>> Also again. Sorry for interrupting. Are you going to
[4:42]
be licensed through the state of Maryland?
[4:45]
>> We will. Yes. That is the next phase of this.
[4:48]
>> Okay. And and what what we what we like. What is your
[4:54]
licensure? What what will that be for?
[4:56]
>> Sure. So it'll be for what's called a day program. That's
[4:59]
what the state classifier program has. Day program.
[5:03]
>> Okay. And your request to them will also then be for a
[5:08]
maximum of 40 students. >> They're going by the
[5:11]
capacity of the Howard County is a proven. So they're
[5:13]
actually looking for that occupancy permit as well. So
[5:17]
whatever number is we are approved for is what they're
[5:20]
going to go with. Nothing greater.
[5:22]
>> Okay. All right. And we just capped it at 40. Yes. Even if
[5:27]
they say 50 you still only get 40.
[5:30]
>> 40 is perfectly fine given the plan that we have in mind.
[5:33]
Yes. >> Okay. All right. I'm sorry.
[5:35]
Go ahead. >> No problem. So besides that,
[5:38]
we will also have our narrative also describes that we will
[5:42]
utilize some of the parking spaces that is currently there.
[5:46]
We will have minivans. I'm not sure how many, just depends on
[5:49]
how many persons that we support at a time. So if we're
[5:52]
supporting ten person within our first year of operation,
[5:55]
then the number of vehicles that we'll have will be based
[5:58]
on that. But it will not go over the the appropriate number
[6:01]
that we have listed in our narrative. Besides that.
[6:05]
>> Are you operating a similar program elsewhere? Now?
[6:09]
>> We community based. It's not in a licensed site, so we are
[6:12]
fully community based right now. We just need a licensed site to
[6:15]
be able to host people within a building. Yeah. Activities.
[6:18]
Yeah. Okay. Yes. So besides that, not really sure what else
[6:23]
to share. I can go over a few other details that are listed
[6:27]
within our narrative, if that's needed.
[6:30]
>> So what you're going to need to share is the document. What
[6:36]
you're going to need to share is all of the requirements of
[6:42]
this particular use. Because right now there is nothing in
[6:45]
the record because I cannot take the technical staff report
[6:50]
as being. They're not here, so I can't cross-examine them. So
[6:57]
I need you to go down all the criteria, see all the criteria
[7:04]
for. And I can help you with that. So the general criteria
[7:13]
for conditional use is you're gonna have to meet that. All
[7:17]
right. So the first criteria is that the proposed conditional
[7:21]
use plan will be in harmony with the land uses and policies
[7:25]
in the Howard County General Plan.
[7:30]
>> Yes. So bear with me one second. I'm pulling up my
[7:33]
attachment to give me one second. Our narrative. Almost
[7:46]
there. >> No worries.
[7:53]
>> And please pardon me if I'm going to just summarize each of
[7:56]
what I have currently. And then if you need more details, just
[7:59]
let me know. Feel free and I'll go a bit deeper.
[8:02]
>> Okay? Because we kind of have to go through every one of
[8:05]
the criteria. So if you want to address the first criteria,
[8:10]
which is harmony of the proposed use with the Howard
[8:13]
County General Plan, how do you do that?
[8:17]
>> Gotcha. So I have so I'm just going to read verbatim.
[8:21]
The petitioner requests an approval of a conditional use
[8:25]
pursuant. And I won't read all of the numbers unless it's
[8:27]
needed. So I have one, three, 1.0 and three and one three of
[8:32]
Howard County zoning regulations to operate a day
[8:34]
treatment and care facility center at 3291 Saint John's
[8:39]
Lane, Ellicott City, Maryland 21042. The subject property is
[8:44]
an existing one, fully developed and established the
[8:47]
process. The proposed conditional use does not
[8:50]
include any new construction, building additions, site
[8:54]
expansion or physical improvements. The use will
[8:57]
occur entirely within the existing structure and utilize
[9:00]
the existing site layout as currently configured. The
[9:04]
proposed facility will provide supportive services for
[9:08]
individuals with disabilities, including program focus on
[9:12]
independent living skills, healthy living, education,
[9:14]
social development and vocational readiness, and
[9:17]
structured opportunities for community participation and
[9:20]
volunteer engagement. The second part is with being in
[9:26]
compliance with section 131.0 n 13 conditional use requirement.
[9:32]
So accessibility and circulation and safety will be
[9:35]
described. The site is served by an existing peculiar excuse
[9:41]
me, access from Saint John's Lane. There's no changes to
[9:44]
that existing access point, circulation patterns or parking
[9:50]
configuration are proposed. The facility will utilize existing
[9:53]
on site circulation and parking areas, so nothing will be
[9:56]
changed where utilizing existing space, our drop off
[9:59]
and pick up for activities will occur on site in a safe and
[10:03]
orderly manner, consistent with one point. Excuse me, 131.0 n
[10:11]
.13 A. I'm probably not citing that correctly.
[10:14]
>> That's okay. The long mouthful yes, I got you.
[10:17]
>> I would not create and will not create unsafe conditions or
[10:22]
congestion on adjacent drive. Excuse me. Roadways then lot
[10:29]
size and capacity which is under 131.0 N13B the existing
[10:35]
developed parcel provides no. >> I think we lost her for a
[10:50]
minute. >> Yeah, she must have hit.
[10:53]
Leave hearing.
[11:45]
Okay, we've got our back.
[11:51]
>> Okay. >> There we go.
[12:03]
>> Alrighty. My apologies. My computer completely shut down.
[12:06]
>> No worries. That's what has happened when we do things
[12:09]
virtually not. Not a worry. >> Gotcha. Thank you. I'm just
[12:13]
going to log back on. And I'm just going to disconnect the
[12:20]
video from my other screen and then stay on my cell phone,
[12:23]
which is fully charged. >> Okay. All right.
[12:34]
>> Okay. >> And I'm very sweaty. Oh my
[12:38]
goodness. >> So no, no no worries.
[12:43]
>> Oh my goodness. Okay, so I believe we're on lot size and
[12:49]
capacity. So I'll continue there. Okay. So for lot size
[12:58]
and capacity, the. And building capacity to accommodate the
[13:06]
proposed day treatment and care facility without modification,
[13:10]
the use will be contained entirely within the existing
[13:14]
building and site improvements, and is consistent with the
[13:18]
capacity of the property under one, three, 1.0 point N13B. The
[13:27]
next point is setbacks and site design, so no new construction
[13:32]
or site disturbance is proposed. There are no changes to
[13:37]
setbacks, buffer or site designs. Existing conditions
[13:41]
remain unchanged and the conditional use does not
[13:44]
increase or intensify any nonconformities consistent with
[13:50]
one, three, 1.0 and 0.3 D. Our next point is compatibility and
[13:59]
absence of nuances. The proposed use operate entirely
[14:03]
within an existing enclosed structure. Use constructions or
[14:10]
slight modifications are proposed. The nature of the
[14:14]
facility's educational, therapeutic and supportive and
[14:17]
is not expected to generate noise, odor, lighting, lighting,
[14:22]
or other or other impacts that would adversely affect
[14:27]
surrounding properties. Because the site remains physically
[14:30]
unchanged, the conditional use does not introduce any new
[14:34]
environmental or physical impacts to the surrounding area.
[14:38]
The use is consistent with professional and institutional
[14:42]
service activities and is compatible with surrounding
[14:46]
land use along Saint Johns Lane. Okay, the next point for us is
[14:52]
the general conditional use standard, which is under 131.0
[14:57]
B harmony with the General Plan. The proposed facility supports
[15:02]
Howard County's goals of providing inclusive, community
[15:06]
based services for individuals with disabilities. The use
[15:10]
promotes independence, accessibility and community
[15:13]
integration. Consistent with the General Plan. Now we're
[15:19]
under nature and intensity of use, which is under 131.0 B two.
[15:26]
The use is low intensity and will not alter the existing
[15:31]
developed development pattern of the site because no
[15:35]
improvements, expansions or physical changes are proposed.
[15:38]
There is no increase in site intensity beyond the existing
[15:42]
conditions. And next we have mobility with vansickle
[15:49]
properties. Hopefully I'm pronouncing that correct under
[15:52]
one three. Thank you. Under 131.0 b three. The proposed use
[15:59]
is fully compatible with surrounding properties. The
[16:03]
facility is located within an existing development structure
[16:06]
and operations are consistent with institutional or
[16:09]
professional service uses. No changes to the physical
[16:13]
environment are proposed and therefore no new impacts to the
[16:16]
adjacent properties will occur. Next, we have adequate public
[16:23]
facilities under 131.0 B four. The site is already served by
[16:30]
existing public infrastructure, including road access,
[16:35]
utilities and emergency services. The proposed use does
[16:39]
not require any infrastructure expansion or upgrades and will
[16:44]
not burden public facilities. Next, we have public health,
[16:51]
safety and welfare under 131. Treatments and care facility
[17:00]
promotes public health health care by providing structured,
[17:05]
supportive services that assist individuals with disabilities
[17:08]
in developing, excuse me, independence, life skills and
[17:12]
community participation. The reuse of an existing developed
[17:17]
site without improvements supports efficient land use and
[17:21]
maximizes environmental and community impacts. Okay, then
[17:26]
we have for our conclusion the proposed day treatment care
[17:31]
facility at 3291 Saint Johns Lane, Ellicott City, Maryland,
[17:37]
21042 fully complies with one three, 1.0 and 13 and the
[17:42]
general conditional use standards under 131.0 B of
[17:47]
Howard County zoning regulations. The use will be
[17:50]
located entirely within an existing established structure,
[17:54]
with no proposed improvements or physical alterations to the
[17:58]
site. As a result, the conditional use introduces no
[18:02]
new adverse impacts and is fully capable with surrounding
[18:07]
be compatible with surrounding development and close. We are
[18:12]
respectfully requested an approval of the conditional use
[18:15]
petition. >> And your hours of operation
[18:23]
are Monday through Friday. Eight A excuse me 8 a.m. to 3
[18:28]
p.m. correct.
[18:46]
I'm sorry, I don't think you heard me. I
[18:49]
said. The hours of operation are Monday through Friday, 8
[18:53]
a.m. to 3 p.m. >> That is correct. Yes.
[18:56]
>> All right. >> Okay.
[18:59]
>> Your square footage is 3075ft?!S.
[19:07]
>> Let me confirm for you. Bear with me. I can pull up the. One
[19:10]
if you. And your is solely for what we're occupying. Correct?
[19:27]
Not for the right. >> The whole, the whole. Use
[19:31]
the religious facility acreage is 8.97 acres. And I'm asking
[19:37]
you for the square footage you're going to be using for
[19:40]
the three classrooms.
[20:03]
>> I don't want to give an approximate. I'm pulling up the
[20:06]
actual map. >> Thank you, I appreciate that.
[20:09]
>> Sure. So draw in that.
[20:39]
>> I'm going to have to do the math. And I'm going to include
[20:42]
the conference room. So just the two classrooms.
[20:46]
>> Now, the entire square footage that you intend to
[20:50]
utilize. >> Yes. So we have.
[20:55]
>> 20. 20. Five plus. Zero. Alrighty.
[21:10]
>> So in total, 2075. >> Okay, perfect. The number I
[21:15]
have two. So we're we're good. All right. And I'm, I'm
[21:22]
presuming that you have entered into a lease agreement with the
[21:25]
religious facility for the three classrooms.
[21:28]
>> Yes. We have. >> Okay.
[21:31]
>> Which is on hold until everything is squared away with
[21:35]
the conditional use. So although we have the agreement,
[21:37]
we don't have an effect. >> Right. Contingent on your
[21:42]
getting the conditional use and probably contingent on your
[21:46]
getting a license from the state, correct?
[21:49]
>> Yes, that is correct. >> Yeah. Okay. All right. Is
[21:53]
there anything further that you would like to tell me tonight
[21:57]
about your application? >> Bear with me one second.
[22:28]
No, I was just taking a look at the
[22:31]
other pieces just to make sure that I wasn't missing anything.
[22:34]
We have been in compliance with submitting all the required
[22:37]
information that was required of us through the process. So I
[22:42]
just would like to know perhaps what the next steps are from
[22:45]
the hearing. This is my first one, so thank you for your
[22:48]
patience with that, with answering the questions I have.
[22:50]
>> Okay. But with regards to this application, I answer your
[22:53]
question just a second. But with regards to this
[22:56]
application, you feel like that you have told me everything
[23:00]
there is to say, and you are asking that I grant the
[23:04]
conditional use. >> Yes, that is correct. Yes.
[23:07]
>> Okay. So the next step in the process is I will issue a
[23:15]
decision and order, and it will either approve the conditional
[23:19]
use as you're asking. It'll approve the conditional use
[23:23]
with conditions and or it will deny the conditional use in the
[23:30]
event. In the event that you are unhappy with my decision
[23:35]
and order, you have a right to appeal to the Board of Appeals.
[23:40]
And in case you're in that position, Miss Berg will help
[23:42]
you through that process. And in the event you were unhappy
[23:46]
with the Board of Appeals, you can always appeal to the
[23:50]
Circuit Court for Howard County and then to the appellate court.
[23:54]
But I don't think we're going to get there. So anyway, a
[23:58]
decision I'm going to declare. Did that answer your question?
[24:04]
>> Absolutely, yes. >> Okay. All right. So I'm
[24:06]
going to declare that the evidentiary hearing in this
[24:08]
matter is deemed to be concluded, and I will be
[24:12]
issuing a decision and order shortly. Okay. And you'll
[24:17]
receive it electronically. Miss Berg will send it out to you.
[24:20]
And then assuming it is an approval or an approval with
[24:26]
conditions, you would then take the next step in your process,
[24:30]
and you probably will be asking the Department of Zoning and
[24:33]
Planning and then processing through the State Board of
[24:38]
Education or whomever, or health, whoever is going to be
[24:42]
licensing your facility. >> No problem.
[24:46]
>> Okay. All right. If we're good, I'm going to declare that
[24:51]
this evidentiary hearing has been held. I've already said
[24:54]
that. And a decision in order will be shortly forthcoming.
[24:57]
And I thank you for your participation here tonight, and
[25:00]
I wish you the best of luck. >> Thank you so much.