Agenda
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[1:12]
But as John, good afternoon
[1:15]
and welcome to the JULY 15,
[1:15]
2026 meeting of the
[1:16]
Metropolitan Development
[1:18]
Commission. I will now call
[1:20]
the meeting to order. We have
[1:24]
a quorum in place. Will all
[1:25]
rise and join me with the
[1:31]
Pledge of Allegiance. Please.
[1:51]
Last? Is there? Well. Members
[1:54]
of the commission you received
[1:57]
the minutes of the JULY first
[1:58]
meeting last week, you had
[2:01]
opportunity to review those.
[2:02]
Are there any additions or
[2:05]
deletions to those minutes?
[2:10]
Hearing? Commissioner he can.
[2:11]
I get a motion to approve. So
[2:15]
moved. Commissioner her gut.
[2:17]
Can I get to say that? Second?
[2:19]
What call the roll her. Get.
[2:26]
Her. Yes. While Lyle, yes.
[2:28]
Where ats Murphy Murphy a
[2:31]
Schumacher Schumacher. Yes.
[2:36]
West west, yes. Do as a yes.
[2:39]
The minutes from JULY first
[2:42]
2026 past 7 to 0 moving
[2:44]
forward. Are there any
[2:44]
content? It's U.S. Withdraws
[2:53]
or special request. Please
[2:54]
introduce yourself.
[2:55]
Absolutely. My name is
[2:55]
Alexander Curlin. I represent
[2:58]
the region. Community schools.
[3:00]
Thank you for your time today.
[3:01]
On behalf of vintage community
[3:04]
schools in their community.
[3:05]
And as you know, we have
[3:08]
hearing today case numbers
[3:12]
2026 Cbr 8, 1, 5, as well as
[3:13]
2026 Cpl. 8, 1, 5, on the
[3:15]
school's behalf and on the
[3:16]
school communities behalf. I
[3:17]
respectfully request a
[3:19]
continuance for cause under
[3:22]
Article 6 Section 8 Point and
[3:24]
17 of the commission's rule.
[3:28]
The school elementary school
[3:29]
joins the site that is being
[3:32]
requested for development and
[3:33]
requested for variants. Yet
[3:34]
the school was not contacted
[3:37]
by the developer until JUNE.
[3:38]
After the hearing
[3:39]
recommendation had already
[3:42]
been made. The board first had
[3:43]
an opportunity to review the
[3:44]
site plan on JUNE 24th barely
[3:48]
a month ago and a revised plan
[3:49]
reached the school only last
[3:53]
week. The petitioners
[3:55]
commitments still remain in
[3:56]
draft form for the large part
[3:59]
and the school is still in the
[4:00]
middle of negotiating
[4:01]
commitments with the
[4:03]
developer. Indeed, the school
[4:05]
district just had an
[4:06]
opportunity to go visit the
[4:08]
site on Monday. And the board
[4:10]
hasn't even had a chance to
[4:12]
talk amongst itself about that
[4:16]
visit. We're not seeking a
[4:16]
delay. What we're seeking is
[4:19]
time to do due diligence. And
[4:21]
so we are asking for fair
[4:22]
opportunity to evaluate the
[4:24]
materials to evaluate the
[4:25]
requests and therefore,
[4:27]
seeking a 45 day. Continuance.
[4:30]
Thank you. I was there
[4:31]
councilor out. You have a
[4:35]
thoughts on this matter. First
[4:37]
of all, welcome. Good to see
[4:38]
Thank PRESIDENT Dylan
[4:39]
Commissioners and Union City
[4:42]
County Councilor District 14
[4:43]
in support of the continuance
[4:44]
requested by the school
[4:48]
district. Did reach out to the
[4:48]
petitioner and the
[4:49]
representative. So let them
[4:50]
know. I think there are other
[4:50]
conversations with the school
[4:55]
district. But again, appears
[4:57]
it is fairly substantial
[4:58]
change to the to the site. And
[4:59]
so just backing up the
[5:00]
council's comments that
[5:04]
allowing for proper time for
[5:04]
that communication to happen
[5:05]
would be supportive of of
[5:08]
their request. So thank you.
[5:11]
Thank you. Thank you for all
[5:14]
your hard work. We appreciate.
[5:14]
Anyone else would like to
[5:21]
comment on this. Yes, Council,
[5:25]
please introduce yourself.
[5:26]
Thank you. Members of the
[5:27]
commission strict Brown with
[5:30]
offices at 300 North Meridian
[5:30]
Street. Sweet. 2500
[5:31]
Indianapolis, Indiana, for 6,
[5:35]
204, for the record today
[5:36]
representing the petitioners
[5:39]
on this case. And I believe
[5:41]
there will be 3 additional
[5:42]
speakers opposing this request
[5:45]
for a continuance after made
[5:45]
remarks on behalf of to share
[5:56]
as well. Comments summarize
[5:58]
those in paper form. If it's
[6:00]
easier to digest while I'm
[6:02]
given my remarks and why we
[6:02]
oppose the continues. We'd be
[6:03]
happy to give this to remind
[6:05]
traitors and you all as well.
[6:06]
It's that's helpful to you
[6:10]
all. Does give your comments
[6:14]
council. So we strongly oppose
[6:16]
the request for a continuance,
[6:19]
especially a 45 day.
[6:21]
Continuance due to significant
[6:22]
contractual consequences that
[6:22]
are involved. This case has
[6:26]
been pending since MARCH. It
[6:26]
is already experienced
[6:30]
multiple continuances. First.
[6:31]
There is an additional month
[6:34]
continuing student that encase
[6:35]
and there is an automatic
[6:36]
continuance take environments
[6:38]
traitors for another month.
[6:38]
And finally, there is a
[6:42]
continuance for cars for
[6:43]
exactly the reasons that
[6:44]
reminds traders have asked for
[6:48]
additional continuance. I came
[6:49]
here before you all and asked
[6:51]
for a continuance after
[6:54]
working with staff in late
[6:56]
JUNE to allow more time to
[6:58]
work with the school, which
[6:59]
we've done and additional
[7:01]
neighbors on additional
[7:04]
commitments. Those resulted
[7:07]
benefits to the school and to
[7:09]
the community, which can
[7:11]
easily be digested as removal
[7:13]
of a building. Additional
[7:14]
green space reduction of
[7:15]
backup generators, reduction
[7:18]
of power, cetera, unexplained
[7:20]
those commitments here at the
[7:21]
podium on on JULY one. They've
[7:24]
been updated on our website as
[7:27]
well. We also put out a media
[7:28]
statement which is covered
[7:30]
broadly by many different
[7:34]
media outlets. And so we
[7:35]
believe that the request is
[7:39]
simply just a delay tactic or
[7:40]
a wish for dc blocks to go
[7:42]
away and not built to edge
[7:42]
note facilities to serve
[7:46]
Indianapolis. The parties have
[7:47]
been afforded ample
[7:48]
opportunity to participate and
[7:50]
be held throughout this
[7:52]
process. 2 different
[7:53]
counselors have had public
[7:56]
forums on this and getting a
[7:56]
continuance at this stage
[7:58]
would unnecessarily delay the
[8:00]
process and undermine the
[8:01]
integrity of the established
[8:03]
procedures which have been
[8:05]
designed to ensure fairness
[8:06]
and transparency for all
[8:09]
stakeholders, not just 3
[8:10]
months. Traitors. There's no
[8:11]
indication that any party has
[8:13]
been deprived of the meeting
[8:16]
opportunity to be heard or
[8:17]
that any procedural safeguards
[8:18]
have been compromised. Our
[8:21]
outreach to counselor Nielsen,
[8:22]
a neighboring counselor
[8:29]
started on MARCH 10th. We also
[8:30]
suspect that Megan will be one
[8:33]
of the lead reminds traitors.
[8:36]
If you look at tab 87 in
[8:38]
binder, too, you can read our
[8:40]
e-mails where we offered a
[8:41]
one-on-one meeting on more
[8:43]
than one occasion and she did
[8:44]
not respond to our latest
[8:48]
request on 6.11 Dc Blacks has
[8:48]
been responsive to all of
[8:50]
those have reached out and
[8:51]
there are some neighbors here
[8:52]
that could speak to that as
[8:56]
well. As it relates to the
[8:57]
school's request for a
[8:59]
continuance, we strongly
[9:00]
disagree with the facts that
[9:02]
they present it before you the
[9:07]
school is an entity that to
[9:08]
receive public notice as part
[9:10]
of the legal notice of this
[9:12]
process. They received that
[9:15]
notice in early APRIL. If you
[9:18]
also look at. Tab 86 of
[9:21]
binder, too. It details our
[9:25]
outreach to Irvington
[9:28]
Community Schools which began
[9:31]
as direct outreach on MARCH 20
[9:32]
force that was prior to the
[9:34]
public notice being received
[9:36]
specifically the school
[9:39]
received 5 emails, 2 phone
[9:40]
calls that were answered by
[9:43]
receptionists for the school.
[9:45]
One in-person visit by dc
[9:46]
Bloc's executive who left his
[9:47]
contact information in a note
[9:51]
for them to call him. One
[9:53]
postcard that the school
[9:54]
acknowledged they received at
[9:55]
an Irvington Community Council
[9:58]
meeting in JUNE as well as a
[10:02]
legal notice. We also posted
[10:02]
additional legal notice signs
[10:09]
on the property as a neighbor.
[10:10]
We additionally participated
[10:11]
in private meetings with
[10:12]
school board. We attended
[10:15]
their public meeting. We
[10:16]
hosted 9 members of the school
[10:17]
board in the admin officials
[10:20]
to Atlanta to visit building
[10:23]
one on JULY 13th or observe
[10:26]
the operations. That date was
[10:26]
not chosen by us. That date
[10:32]
was chosen. The school we had
[10:33]
meaningful conversations.
[10:38]
Those have. Resulted and there
[10:39]
on the screen as a result, a
[10:42]
in conclusion tan tan
[10:44]
commitments concluding in
[10:46]
county s they are also an
[10:47]
entity that are on the
[10:48]
commitments being able to be
[10:52]
enforced. We have. Council
[10:55]
said conclusion, yes, your
[10:58]
memoirs in conclusion I'd love
[11:00]
for you to hear from our
[11:01]
experts that we fund in today
[11:02]
and as well as the property
[11:09]
owner. Thank you. Good
[11:10]
afternoon, Vincent Ash. Here
[11:11]
on behalf of the property
[11:14]
owner and developer Law Group.
[11:17]
Respectfully, we ask that
[11:20]
oppose any continuance on this
[11:22]
matter. The project to this
[11:23]
property has actually been
[11:24]
under contract a contract
[11:28]
since DECEMBER of 2025,
[11:29]
negotiate an extensive due
[11:31]
diligence period, which has
[11:32]
both extensions options have
[11:39]
been utilized. In addition,
[11:40]
there's you know, throughout
[11:42]
that Ross Esol parties
[11:43]
dedicated a significant time
[11:44]
resources and capital reliance
[11:46]
on an established schedule.
[11:50]
And that's counselor spoke dc
[11:50]
blocks of provided him a lot
[11:51]
of opportunities for public
[11:52]
engagement through multiple
[11:54]
channels. I do want to
[11:56]
emphasize that continued
[11:56]
delays on this project not
[11:59]
only affects this one, but it
[12:02]
infects our timing and
[12:03]
investment of other planned
[12:03]
projects on the property as
[12:05]
well broader development
[12:07]
efforts. So with that, I
[12:08]
kindly ask that you oppose
[12:10]
any, continue it and hear
[12:11]
Thank you. Schedule here
[12:13]
today. Thank you. Yes, ma'am.
[12:16]
Please introduce yourself. Hi,
[12:19]
I'm an award saying I I'm
[12:21]
MISTER Ney and no word saying
[12:24]
thank you. I'm a school
[12:24]
psychologist in the
[12:25]
Indianapolis school districts
[12:29]
and charter schools. I just
[12:30]
want to ask us talk about the
[12:34]
kind broader concerns with
[12:38]
these data centers and also
[12:40]
just the tax initiatives that
[12:41]
these people are getting for.
[12:43]
Building data centers here. I
[12:45]
need your position my position
[12:46]
is I'm opposing it like I want
[12:46]
continuance. I want us to
[12:49]
continue talking. Thank you
[12:50]
very much. Yes, Thank you very
[12:53]
much. Thank you. Thank you.
[12:54]
Councilor we've been waiting
[12:59]
for you. I'm not done yet. And
[13:03]
you're done. I have more to
[13:05]
say. Thank you. You have taken
[13:08]
a position now explain to you,
[13:09]
why have that position and
[13:10]
don't you people here right
[13:12]
now to listen to me, Libya?
[13:15]
Right now. We've got your
[13:16]
Pitino. Listen. This can you I
[13:18]
know. I agree. I know it's a
[13:20]
continuance and I'm asking for
[13:21]
that. And I know that you have
[13:21]
my opinion. You know that.
[13:23]
That's what I want. But what?
[13:28]
What are my reasons? It's
[13:29]
because what what else are we
[13:29]
spending money on in this
[13:34]
town? We're not here to
[13:37]
debate. You know, I'm not Tell
[13:40]
hearing think about later.
[13:40]
This is for continuance
[13:42]
Understand your position.
[13:45]
Okay. Thank you. Thank you.
[13:48]
Counselor heart. Thank you,
[13:49]
MR. PRESIDENT, welcome. So
[13:52]
i'll be brief just on the
[13:55]
continuous piece I'm opposed
[13:57]
to continuance is a pretty
[13:59]
digestible change from the
[14:01]
petitioner. Really easy to
[14:04]
understand. I agree with the
[14:05]
petitioner that there was
[14:05]
ample amount of notification
[14:06]
made, especially on the fact
[14:09]
that they were part of the
[14:10]
original distribution of
[14:11]
notification just due to legal
[14:12]
process. Beyond that, I
[14:13]
believe my understanding is
[14:17]
of. Their concern for real
[14:18]
continuance is because they're
[14:20]
concerned about enrollment for
[14:20]
their school and making sure
[14:21]
that they can try and keep up
[14:23]
their enrollment numbers. I
[14:25]
don't believe that this
[14:25]
particular development would
[14:28]
impact that given that there's
[14:29]
already so much industrial
[14:30]
that is adjacent to their
[14:32]
property. This is not new
[14:32]
industrial. We're talking
[14:33]
about a fully established
[14:36]
industrial site today. And I
[14:37]
don't think that this
[14:38]
particular development would
[14:39]
have any impact on their
[14:41]
concern that I've heard. So
[14:45]
I'm opposed to a continuance
[14:45]
couple questions. Councilor
[14:46]
her, first of hold you in high
[14:47]
regard and have a lot of
[14:48]
respect for you. Thank you for
[14:52]
being here. You're in district
[14:59]
20, sir. District 20 is the.
[15:00]
District that this matter is
[15:01]
being conducted. Just so you
[15:02]
are the sitting city Council
[15:04]
person in district, one. Yes,
[15:05]
Okay. I just want make sure
[15:06]
that's clear for the record.
[15:08]
And then you add on the
[15:09]
project on the project as a
[15:11]
whole, I want know you want
[15:14]
that. I want to right now as i
[15:15]
look at the finding of facts
[15:18]
on this project, it fits all
[15:19]
of them. Write it when they
[15:20]
come before you in the game
[15:23]
for the hearing examiner,
[15:24]
there's nothing in their
[15:24]
petition that is outside the
[15:27]
boundaries of would constitute
[15:32]
any level of ability to pass
[15:34]
your discretion where I see
[15:35]
the opportunity for this
[15:36]
development is in the
[15:36]
tremendous amount of
[15:38]
opportunity, both in the tax
[15:39]
base and the community impact
[15:41]
payments come from this.
[15:41]
There's a lot that will come
[15:47]
from. Don't go. All right.
[15:48]
Going to be a lot that's going
[15:49]
to come from the tif district
[15:50]
that this is an ugly that will
[15:52]
have a tremendous amount of
[15:53]
impact on Irvington with
[15:55]
allocation area already
[15:57]
exists. When we talk about
[15:58]
places like Irvington Plaza
[15:59]
Ellenberger Park. So that will
[16:02]
impact District 14. There's a
[16:04]
large commitment and dollars
[16:04]
that will go towards
[16:05]
infrastructure, which I'm I'm
[16:06]
right now under the impression
[16:08]
that will go to impact the
[16:09]
Washington Square Mall, which
[16:10]
impacts a strict 20. There's
[16:11]
another 2 and a half million
[16:14]
dollars. That is just a
[16:15]
charitable incentive from the
[16:17]
petitioners that will go
[16:19]
towards initiative that we've
[16:22]
been trying to revive the Rams
[16:23]
Bird ymca in a sense, you
[16:24]
know, with some other
[16:26]
operators, which is still
[16:28]
communications, which those
[16:29]
things are the things that
[16:32]
when I did my my door knocking
[16:34]
my listening might my surveys.
[16:35]
That's what people want me to
[16:37]
work on how to revive them
[16:39]
all. How do you get the ymca
[16:41]
back? And this provides a
[16:42]
financial means to do that
[16:43]
through those taxes and the
[16:44]
abatement. So you're for the
[16:46]
project. Right now. The
[16:48]
project is favorable. Yes,
[16:49]
thank you. Thank you for being
[16:51]
Council. Thank you. All right.
[16:54]
Counselor.
[17:04]
Please introduce yourself. And
[17:06]
Jon PRESIDENT Of the Central
[17:06]
Indiana Building Trades
[17:07]
Council. We stand appreciation
[17:09]
being to the point is, well,
[17:09]
please step stand in
[17:14]
opposition of the continuance.
[17:14]
One more time. We stand in
[17:15]
opposition of the continuance.
[17:18]
Thank you. You're back for
[17:21]
more. I'm back for more. What
[17:23]
we've got your request.
[17:25]
Appreciate that. I do want to
[17:26]
add one thing. I'm with regard
[17:27]
to a counselor. Hart said he
[17:30]
MAY very well be right. We
[17:31]
just don't know which is why
[17:35]
we're asking for more time. We
[17:36]
didn't MISS West around. I
[17:42]
don't think she is. She's not
[17:44]
lying about the reach out when
[17:45]
I think there was a mistake in
[17:46]
how it happened because it
[17:48]
never came to the board. And
[17:52]
so as a result, the board was
[17:56]
not notified until the end of
[17:56]
JUNE or mid JUNE. And the
[17:57]
board hasn't had an
[17:58]
opportunity to review as MISS
[18:00]
West. Rick Brown has admitted
[18:02]
our conversation with dc
[18:05]
Blocks has made this project
[18:06]
better. More conversation.
[18:10]
We'll make it even better. So
[18:11]
to the extent that there's
[18:11]
improvement to be done in this
[18:16]
project. A short time for due
[18:18]
diligence, isn't everybody's
[18:20]
interest. Thank you very much.
[18:24]
I'm gonna go Staff any the
[18:27]
matter on the continuance.
[18:28]
Thank you. PRESIDENT Dylan
[18:29]
members of the commission
[18:31]
staff is prepared to go
[18:31]
forward today. And as you
[18:32]
know, it is up to the
[18:32]
commission to make the
[18:36]
decision. Thank you very much.
[18:37]
We've had a request members of
[18:39]
the commission. For a
[18:48]
continuance. 2026. Cvr. 8.15,
[18:52]
in 2026. Cpl. 8.15 It would
[18:54]
take a motion from a member of
[18:55]
the commission and a second.
[18:55]
Is there a motion to continue
[18:58]
so moved? Thank you. Is there
[19:04]
a second? Thank on your
[19:09]
motion. On time. How long you
[19:16]
want to continue it? 30 days.
[19:17]
Can your manager motion that
[19:20]
come amended for 30 days.
[19:21]
Amend the motion for 30 days.
[19:25]
I'm sorry. I amend the motion
[19:26]
on the floor to be a 30 day.
[19:28]
Continuance. And we have a
[19:32]
second on that. Yes, sir.
[19:33]
Thank you. We have a motion
[19:41]
and a second. To continue.
[19:44]
2026. Cvra 15, 2026 Cpl. 8.15,
[19:49]
for 30 days. And I think on
[19:52]
our schedule correctly rise
[19:53]
try to get to AUGUST 19 not be
[19:54]
correct. AUGUST 19 would be
[19:56]
the hearing. Thank you, sir. I
[19:59]
will now call the roll on the
[20:03]
vote for continuance. Her.
[20:07]
Yes. Yes, is to continue.
[20:11]
That's correct. Got so yes.
[20:12]
Vote is for the motion to
[20:14]
continue a no vote is against
[20:20]
the motion. Yes. Lyle. Yes.
[20:27]
Already know. Murphy now.
[20:37]
Schumacher. Yes. What snow?
[20:41]
Dylan is a no. We will have a
[20:44]
hearing today. The continuance
[20:46]
has been defeated 4 to 3.
[20:49]
Moving forward. Are there any
[20:57]
other special request? Good
[20:58]
afternoon. PRESIDENT Dylan
[20:59]
members of the commission show
[21:01]
called Around 11 South
[21:03]
Meridian here Indianapolis. I
[21:04]
have the other case today for
[21:07]
public schedule for public
[21:12]
hearing. It's agenda item. 17,
[21:14]
2026, 0, 0, 5, 7 at 37. 0, 9,
[21:17]
east Washington street. We
[21:18]
would respectfully request a
[21:19]
short continuance to your
[21:22]
AUGUST 5th hearing just given
[21:24]
kind of the dynamics in the
[21:26]
room today. We think that
[21:27]
would be beneficial for all
[21:30]
parties concerned. Thank you.
[21:31]
Members of the staff, you have
[21:33]
any comments on that. Thank
[21:35]
you. PRESIDENT Dylan members
[21:36]
of the commission staff would
[21:37]
have no objection to the
[21:39]
continuance of 2026. Co nz
[21:41]
Rose 5, 7, to the AUGUST 5th
[21:42]
hearing and that would be
[21:45]
without additional notice.
[21:46]
Thank you is or what else you
[21:46]
want comment on this
[21:48]
particular continuance?
[21:49]
Questions from members of the
[21:52]
commission. Hearing. None we
[21:56]
have before us. A continuous
[22:01]
continue request.
[22:01]
Councilmember sure you get it
[22:08]
right for 2026. 5, 7, correct.
[22:09]
To be heard on AUGUST 5th, let
[22:12]
me call the roll her gut. Her
[22:15]
star and then the motion. I
[22:16]
need a motion. So moved
[22:19]
segment. Second, thank you.
[22:21]
Let me call the roll. Her. Get
[22:26]
her. Yes. Lyle Lyle. Yes.
[22:29]
Moreira Mauritius Murphy
[22:29]
Murphy s Schumacher.
[22:32]
Schumacher. Yes, west, yes.
[22:37]
Doing is a Council. You've got
[22:37]
AUGUST thank you. Thank you
[22:45]
very much. Yes, ma'am. I have
[22:49]
a special request. I I request
[22:50]
that you hear a few more
[22:53]
voices and to take a second
[22:53]
vote about the continuance
[22:54]
with the dc block so that you
[22:56]
can make a wise decision that
[22:59]
does not put un legal danger
[23:01]
or even to put the dc blocks
[23:05]
council in a legal bind. Thank
[23:08]
you. Decided the matter and to
[23:11]
the ips member. We are more
[23:13]
and help more than glad to
[23:17]
hear your comments as a
[23:17]
reminder straighter during the
[23:18]
here. So please be ready for
[23:26]
that. Thank you very much.
[23:27]
Thank you. PRESIDENT Jesse
[23:28]
Brown City going out to
[23:30]
district 13. I'm asking for a
[23:31]
special request for PRESIDENT
[23:32]
Dylan and the rest of this
[23:34]
commission to institute a data
[23:35]
centre moratorium effective
[23:36]
immediately or soon as
[23:38]
possible. As of MAY you
[23:39]
receive notice that all 25
[23:40]
counselors, one of the
[23:41]
moratorium until the Su 47
[23:44]
zoning was completed. As of
[23:45]
this week, you've heard that
[23:47]
the dmv staff PRESIDENT There.
[23:48]
I'm Mayor Hogsett and
[23:48]
PRESIDENT Lewis have also
[23:51]
supported this moratorium. We
[23:52]
heard in committee the danger
[23:52]
of allowing developers to slip
[23:56]
through few weeks when the
[23:56]
outcome is clear. But just
[23:59]
paperwork has been done. The
[24:00]
council cannot initiate a
[24:01]
moratorium, but you can you
[24:02]
don't need to wait for the
[24:04]
city council to return the
[24:06]
amended proposal. And so I am
[24:08]
asking you to act today to
[24:09]
amend the agenda and or call a
[24:10]
special meeting. Do everything
[24:11]
in your power to institute a
[24:12]
moratorium as soon as
[24:14]
possible. Will further
[24:15]
conversations happen? You do
[24:15]
have this power so we need to
[24:17]
use it. Thank you. Thank you,
[24:18]
counselor. Let me make a
[24:33]
point. Counselor. Castle, any
[24:37]
makeup point of order? And you
[24:38]
know, this better than most.
[24:42]
We have. The city council
[24:45]
who's taking the position that
[24:49]
they want a moratorium on new.
[24:51]
Data centers. The mayor has
[24:53]
taken a position that he wants
[24:57]
a moratorium on new. Data
[24:58]
centers. No question.
[25:01]
Everybody's public on that.
[25:03]
The process now goes back to
[25:04]
the council to shoot us back.
[25:08]
A ordinance. Requesting that
[25:10]
that then we would have to
[25:11]
address LaVar issues.
[25:18]
Counselor. Is state law. 36 7,
[25:19]
4, 1, 1, 1, 9, which is
[25:21]
referred to as the vested
[25:23]
rights. So the individuals in
[25:26]
the I think there's 3 in the
[25:27]
queue. Correct me if I'm
[25:31]
wrong. All have a vested right
[25:31]
of the process and they've all
[25:34]
gone through the process and
[25:37]
should by statute have a vote.
[25:39]
So from a point of order
[25:40]
standpoint, we are waiting for
[25:40]
the council to give us the
[25:43]
moratorium. We've got the
[25:44]
message from the mayor's
[25:47]
office. Assuming that's going
[25:49]
to happen in a timely fashion.
[25:51]
And that's those directions or
[25:54]
we will follow at the time.
[25:55]
But as of today, because of
[25:56]
the vested rights state law,
[26:00]
we got to keep moving. Just
[26:02]
quick because I misstated
[26:03]
wasn't speaking about, you
[26:05]
know, Metro blocks, dc blocks
[26:06]
the people in front of you
[26:07]
today. I was worried about for
[26:08]
the next 30 45 days until you
[26:12]
receive that proposal. I worry
[26:14]
that now new people look at
[26:15]
that. That's of interest. You
[26:16]
mentioned that's you can to
[26:16]
avoid. We're going to stay in
[26:18]
concert with what the council
[26:19]
and the mayor's office wants
[26:20]
to do. And then we will follow
[26:22]
through from that. Thank you
[26:30]
for being here. Council. Good
[26:31]
afternoon. PRESIDENT Dylan
[26:33]
commissioners, Tonya Wilson,
[26:34]
economic incentives. I'm here
[26:37]
on behalf of item number 6
[26:40]
staff respectfully requesting
[26:41]
a 2 continuous for resolution.
[26:45]
Number 2, 0, 2, 6, 8, 0, 3, 4,
[26:49]
There was a identified which
[26:50]
notice the incorrect parcel
[26:52]
and we need time to write
[26:53]
prompts a formation. Every
[26:54]
notice and curry notice. And
[26:57]
so we're asking for a 2 week,
[27:01]
continuance to AUGUST the 5th.
[27:02]
Thank you, Steph. Comments on
[27:08]
this. Only that he would be
[27:08]
required. Would you notice
[27:09]
which is already in place? To
[27:12]
give notice? Questions from
[27:17]
members of the commission. But
[27:18]
I also like to comment on
[27:21]
request for a continuance.
[27:22]
Seeing none we have before us
[27:27]
2026. 3, 4, request for a
[27:29]
continuance to the AUGUST 5th
[27:30]
meeting. Can I get a motion to
[27:33]
approve? Some of You
[27:35]
Commissioner Murray? Can I get
[27:37]
a second second? Thank you,
[27:38]
commissioner her let me call
[27:45]
the roll. Heard her. Lot. No.
[27:52]
Where? Murphy s. Schumacher,
[27:59]
Schumacher. Yes. West west,
[28:04]
Dylan is a yes. You received.
[28:07]
Continuance of 2026. 3, 4, to
[28:10]
be continued to artists by
[28:12]
vote of 6 to one. Thank you.
[28:18]
Thank you. Final. Requests
[28:23]
withdraws continuances. Seeing
[28:24]
Nancy, can you read the
[28:24]
resolutions and to the
[28:29]
minutes? Thank you. PRESIDENT
[28:35]
Dylan and commissioners. 2026
[28:36]
are 0 to one authorizes the
[28:38]
Department Metropolitan
[28:39]
Development to use locally
[28:41]
available funds in an amount
[28:45]
not to exceed $15,000 to
[28:45]
demolish this structure
[28:48]
located at 26. 38. And 26 40
[28:51]
East 10th Street to facilitate
[28:53]
investigation and removal of
[28:58]
underground storage tanks.
[29:02]
2026 a 0, 1, 4, a public
[29:05]
hearing. Preliminary economic
[29:05]
revitalization, excuse me, not
[29:10]
for public hearing. 2026. A 0,
[29:12]
1, 4 preliminary economic
[29:12]
revitalization area resolution
[29:16]
for Metro Blocks, llc, located
[29:18]
at 25, 0, 5, North Sherman
[29:21]
Drive Council district 8
[29:21]
Senator Township recommended
[29:23]
approval of 10 years. Real
[29:28]
personal property abatement.
[29:31]
2026. A 0, 1, 5 preliminary
[29:32]
economic revitalization area
[29:35]
resolution for Metro Block. So
[29:37]
we'll see located a 25, 0, 5,
[29:39]
North Sherman Drive Council
[29:41]
district 8 Center Township
[29:43]
recommended approval. 15
[29:44]
years. Enhanced personal
[29:50]
property tax abatement. 2026.
[29:52]
A 0, 1, 9, 4, public hearing
[29:54]
resolution authorizes an
[29:54]
amendment to the 2023 Real
[29:58]
property tax abatement
[30:01]
approved by resolution 0, 2,
[30:06]
to 6 Alfa Laval, U.S. Group
[30:10]
Services, Real Estate llc. 58
[30:12]
20 Meritage Parkway Council
[30:12]
district. 25 Franklin
[30:18]
Township. 2026. A 0, 3, 3, 4
[30:25]
public hearing. Finau Economic
[30:26]
revitalization area resolution
[30:29]
for Ccbc see operations cells.
[30:30]
Lc located at 5,000 West 25th
[30:34]
Street Council District 11
[30:36]
Wayne Township recommended
[30:36]
approval for years. Personal
[30:38]
property tax abatement. This
[30:39]
the reading of the
[30:43]
resolutions. Thank you, Nancy
[30:47]
resolutions were for There are
[30:50]
3 that are not scheduled for
[30:54]
public hearing 2026 to one
[30:59]
2026. 1, 4, 2026. A 0, 1, 5.
[31:08]
Let me be clear. Resolutions.
[31:09]
If approved, then would go to
[31:11]
a public here. All this does
[31:15]
is put them on the calendar.
[31:16]
There's no decision on any one
[31:18]
of them today. There's no
[31:19]
debate on any one of them
[31:22]
today. That all happens in the
[31:23]
public meeting. That would be
[31:26]
scheduled at this point for
[31:28]
AUGUST. 5th Rice, is that
[31:30]
correct? That is correct. I
[31:30]
just want to make sure I'm
[31:32]
clear for the record. All
[31:38]
right. We have before 2026 to
[31:44]
one 2026. 1, 4, 2026. 1, 5,
[31:46]
that are not set for a public
[31:48]
hearing. Commissioner Murray,
[31:49]
can I get a motion to approve
[31:53]
the 3 so moved? Thank you,
[31:54]
commissioner, any kind get a
[31:56]
second second, let me call the
[32:00]
roll her. Get. Her. Yes. While
[32:06]
Lyle, yes. Mauritius. Murphy
[32:09]
Murphy s Robinson. I'm sorry,
[32:11]
Robinson. Not here.
[32:14]
Schumacher. Schumacher. Yester
[32:21]
one. No 2, 3, So you're no on
[32:25]
2026. Won 4 in '01, 5, Got it
[32:28]
in your yes. On 2026. To one.
[32:36]
West. West. Yes. Dylan is a
[32:41]
yes. They pass. Some 2026. To
[32:48]
one Nancy passes 7 to 0 2026.
[32:54]
1, 4, passes 6. Yes, one, no
[32:56]
'01, 5 passes 60 s one. No.
[33:01]
Moving forward. Nope, you can
[33:03]
you read those in the record?
[33:09]
Is thank you. Sorry, Nancy, I
[33:10]
jumped again. We get public
[33:11]
hearings. I gotcha. Thank you,
[33:13]
counselor. Appreciate it. All
[33:15]
right. We now have before us
[33:19]
2026 1, 9, for a public
[33:21]
hearing. Resolution authorizes
[33:21]
an amendment to the 2023 real
[33:25]
property tax abatement
[33:29]
approved by resolution to 6
[33:30]
yet out. A lot U.S. Group
[33:37]
Services, Real Estate llc,
[33:38]
Parkway Council district. 25
[33:42]
in Franklin Township. Thank
[33:44]
you. PRESIDENT Doing and
[33:45]
members of the commission. I
[33:46]
am the Ramsey compliance
[33:49]
manager for economic Sennas.
[33:50]
This resolution requesting
[33:53]
public handsome and the terms
[33:56]
just agreement, the amendment
[33:57]
would transfer to the new
[34:00]
owner after loved by U.S.
[34:03]
Troops Services, Real Estate
[34:04]
llc, an extended job creation
[34:05]
commitment deadline to
[34:10]
DECEMBER 31st. 2026. The dmv
[34:13]
staff supports the amendment.
[34:14]
Representatives from af of
[34:15]
Laval and gp cm County Line
[34:16]
Partners are expected to be in
[34:20]
the audience. Thank you. Gonna
[34:21]
questions from members of the
[34:24]
commission. There anyone else
[34:25]
here today to cares the
[34:31]
comments? On '01, 5, Sharon,
[34:34]
a. I will accept a motion to
[34:39]
approve. 2026. 1, 9,
[34:43]
commercial or so moved. Thank
[34:44]
you commission. Allow can I
[34:47]
get a second second call? The
[34:48]
roll heard her. Yes, while
[34:53]
yes. Where Murphy Murphy
[34:54]
Schumacher Schumacher. Yes,
[35:02]
West. West. Yes, don't as a
[35:07]
2026 1, 9, 7 to 0. That takes
[35:08]
us to 2026. 3, 3, for public
[35:18]
hearing. Final economic
[35:19]
revitalization area resolution
[35:23]
for Ccbc See Operations, llc
[35:23]
that 5,000 West 25th Street
[35:27]
Council District 11 in Wayne
[35:29]
Township recommended approval
[35:29]
for years. Personal property
[35:33]
tax abatement. Well, thank
[35:35]
you, PRESIDENT Good afternoon.
[35:38]
PRESIDENT Dylan and
[35:38]
commissioners Cathy battle
[35:39]
with the economic incentives
[35:43]
team. The dmv. I am here on
[35:44]
behalf of ccbc see operations
[35:45]
or better known Coca-Cola
[35:49]
battling and Consolidated llc
[35:53]
located at 5,000 West 25th
[35:54]
Street and the time the
[35:56]
Speedway on JULY, the 13th
[35:59]
they received a approval of a
[35:59]
resolution approving an
[36:04]
abatement in their area. This
[36:05]
is for a four-year personal
[36:06]
property tax abatement at a
[36:08]
50% straight line deduction
[36:10]
with a 31.5 million
[36:12]
investment. The company is
[36:13]
installing a new blast,
[36:15]
bottling man manufacturing
[36:18]
line. This will be only the
[36:19]
manufacturing glass. Bottom
[36:22]
line in the us Coca-Cola has
[36:28]
thrive within city for many
[36:29]
years. They will be retaining
[36:33]
179 full time jobs of with 77%
[36:36]
of those jobs are held by
[36:37]
Marion County. Residents going
[36:40]
to be adding 16 new jobs with
[36:43]
this project. Pain above $24.
[36:44]
An hour. In addition, the
[36:47]
company has gone beyond the
[36:49]
normal 5% inclusivity
[36:50]
commitment and it's providing
[36:54]
a 10% inclusivity commitment
[36:56]
totaling 91 $1000 to go
[36:57]
towards infrastructure
[36:58]
improvements along Georgetown
[37:03]
Road. Staff is recommending
[37:05]
approval of resolution, 2, 0,
[37:05]
2, 6, 8, 0, 3, 3, for 4 years.
[37:06]
Personal property tax
[37:09]
abatement. Thank you. Is
[37:10]
ruinous here today like to
[37:14]
comment on this resolution?
[37:15]
Seeing none. Are there any
[37:16]
questions from members of the
[37:22]
commission on 2026, 3, 3,
[37:22]
Hearing. Commissioners.
[37:24]
Schumacher. Can I get a motion
[37:26]
to approve 2026? 3, 3 so moved
[37:27]
treshon allow. Can I get a
[37:31]
second second? Call the roll.
[37:36]
Her. Yes, Lyle, yes. Ats?
[37:39]
Murphy Murphy a. Schumacher
[37:45]
Schumacher. Yes. West, yes.
[37:49]
Doing as a yes, 2026. 3, 3,
[37:50]
passes 7 to 0 and put a lot of
[37:52]
time and effort into that.
[37:55]
Well done. Thank you.
[38:02]
2026. 3, 3 was continued to
[38:05]
AUGUST 5th. So I believe we're
[38:11]
done with our resolutions.
[38:18]
Think 2026 a 0, 3, 4,
[38:19]
Continuing. This continues
[38:22]
okay. Now as you read the
[38:24]
petitions of no appeal into
[38:27]
the record. Yes, sir.
[38:28]
Petitions and no appeal
[38:32]
recommended for approval.
[38:37]
2026. App's 0, 1, 1, 5,001 is
[38:38]
5, 0, 0, 1, East Raman Street
[38:39]
Center Township Council
[38:46]
District 19. 2026 0, 0, 1, 6,
[38:49]
but 30, 30 Southeastern Avenue
[38:49]
Centre Township Council
[38:56]
District 18. Twenty-twenty 6
[39:00]
0, 2, 7 16, 11. East 18th
[39:00]
Street Center Township Council
[39:09]
District 8. Twenty-twenty 6,
[39:10]
0, 0, to 9 at 1, 0, 0, 3, or
[39:13]
10, 0, 3 West 30th Street
[39:14]
Center Township Council
[39:21]
District 12. 2026 0, 0, 3, 0,
[39:23]
amended 35, 0, 5, South Hardin
[39:23]
Street Perry Township Council
[39:30]
District. 22. 2026, 0, 0, 3,
[39:33]
8, and 18, 30 Shelby Street
[39:33]
Center Township Council
[39:40]
District 8 teen. 2026 0, 0, 4,
[39:43]
6, to 32 16 East 25th Street
[39:44]
Center Township Council
[39:52]
District h. 2026 Eazy e and 8,
[39:54]
1, 3, amended 11, 27 South
[39:55]
East Re Center Township
[40:00]
Council District. 18. And
[40:06]
lastly 2026 Eap 8 to 4 at 41
[40:06]
0, 7, East Washington Street
[40:09]
Center Township Council
[40:10]
District 13. This season's the
[40:11]
reading the resolutions that
[40:12]
were recommended for approval
[40:15]
by the hearing examiner. Thank
[40:16]
you, Nancy. We have 2026, a p
[40:22]
p o 1, 1, 2026, 0, 1, 6, 2026,
[40:32]
0 to 7, 2026, 0 to 9, 2026, 0
[40:40]
2026, 3, 8, 2026, 0 for 6,
[40:45]
2026. See Zn 8, 1, 3, 2026. C
[40:50]
a p 8, 2, 4 Commissioner
[40:51]
Murray. Can I get a motion to
[40:53]
approve all 9 so moved
[40:54]
Commissioner Schumacher going
[40:56]
to get a second second. Let me
[41:01]
call the roll. Heard her. Yes.
[41:02]
While yes, more already essler
[41:09]
Murphy Schumer. West. Yes, all
[41:12]
passed all 9 past 7 to 0. We
[41:14]
have one public hearing.
[41:22]
Please read into the record.
[41:23]
Thank you. PRESIDENT Dylan and
[41:27]
commissioners. Petitions for
[41:29]
public hearing people.
[41:30]
Petitions recommended for
[41:30]
approval by the hearing
[41:33]
examiner appeal feel filed by
[41:39]
every month straighter 2026.
[41:42]
Cvr 8, 1, 5, amended 2026 e 8,
[41:46]
1, 5, but 305, fentayl drive.
[41:50]
Township Council district 20
[41:54]
property is owned issues. Dcb
[41:55]
Indianapolis llc by Monday
[41:58]
West Rick Brown requesting a
[42:00]
variance of use and
[42:01]
development standards of the
[42:03]
consolidated Zoning and
[42:05]
subdivision ordinance to
[42:05]
provide for construction of a
[42:07]
data center not permitted
[42:09]
consisting of up to 2
[42:13]
buildings up to a total
[42:15]
330,000 Square feet with no
[42:18]
less than 100 parking spaces,
[42:18]
minimum 330 parking spaces
[42:25]
required. Also requesting
[42:26]
approval of a subdivision plat
[42:29]
to be known as replant of of
[42:31]
the Thunderbird. Commerce
[42:33]
entered Subdividing. 32.4, 0,
[42:37]
6, acres into 2. Lots. Well,
[42:41]
all those intending to
[42:42]
testify, please stand but
[42:43]
PRESIDENT Dylan will address
[42:50]
you for assembly. Women day.
[42:51]
All those intended to testify.
[42:51]
Please stand raise your right
[43:00]
hands. Do you swear or affirm
[43:00]
and to penalize the Purdue to
[43:01]
tell the truth and nothing.
[43:02]
But the truth say I do. Thank
[43:07]
you. Thank you. Let me walk
[43:08]
through rules of engagement as
[43:09]
we move forward. This is a
[43:13]
public hearing. We conduct
[43:16]
with. Guidance by the rules
[43:21]
and by proper. Procedure and
[43:26]
buy. The crowd. Recognizing
[43:29]
that these are tough issues
[43:29]
and then we're going to move
[43:30]
through pretty fast
[43:34]
professionally as we can.
[43:37]
Petitioner gets 15 minutes.
[43:38]
The reminds traitors get 15
[43:42]
minutes. I will then go to any
[43:42]
city council, person who wants
[43:45]
to comment. Mills. And I think
[43:48]
you want to comment then go to
[43:53]
staff. Come back for 5 minutes
[43:55]
rebuttal to the petitioner 5
[43:57]
minutes rebuttal to the rim on
[43:58]
straighter. And then we will
[43:59]
take a vote members of the
[44:02]
commission, its 2 votes. 2
[44:05]
bouts now. I have a special
[44:10]
requests. Alexander, make sure
[44:13]
that you're up in front on the
[44:14]
reminds traitors my front and
[44:15]
the back Make sure you're up
[44:19]
front. On stretchers to give
[44:20]
your testimony and your
[44:21]
thoughts. That's the
[44:21]
appropriate time to tell us
[44:23]
what you think. And we
[44:26]
appreciate it very much.
[44:32]
Councilor you're on the clock.
[44:33]
Thank you. Members of the
[44:33]
commission Monday, Western
[44:35]
Brown with offices at 300
[44:36]
north Brady and Sweet. 2500
[44:37]
Indianapolis, Indiana for 6 to
[44:41]
0 for for the record. Today
[44:43]
joined by dc blocks executives
[44:44]
thereby owes aren't have one
[44:47]
of your binder. Dc blocks was
[44:48]
founded in 2014 and has over
[44:51]
10 locations in the Southeast
[44:52]
information about the company
[44:55]
can be found in tap to but dc
[44:56]
Blacks would like to bring to
[44:57]
edge note facilities to and I
[45:02]
3 par saw. We appreciate your
[45:03]
attention to important in big
[45:04]
cases like this one project.
[45:07]
Details and facts tax are
[45:08]
absolutely critical here with
[45:11]
a lot of misinformation. So my
[45:13]
apologies for the 7 inches of
[45:14]
finder. But it's absolutely
[45:15]
critical that we have all the
[45:18]
facts with limited time. I'm
[45:19]
going to work to show you how
[45:20]
we've responded to community
[45:22]
members made real progress by
[45:24]
working tirelessly to answer
[45:25]
questions at a lot of
[45:28]
commitments, make amendments
[45:30]
and make improvements at every
[45:31]
turn that demonstrate we meet
[45:35]
them. Findings of fact. Dc
[45:37]
Blocks has met some absolutely
[45:38]
great leaders and community
[45:40]
activists on the east side and
[45:42]
has significant support from
[45:44]
the Warren Township
[45:45]
Development Association. A
[45:47]
member of the Irvington
[45:48]
Community Council nearby
[45:50]
residents and East side,
[45:51]
neighbors, the trades and
[45:56]
civic leaders. This and has
[45:57]
produced the community support
[45:58]
that's outlined in Tab 17
[46:01]
through 25 in your binder.
[46:02]
Nancy and Kathleen also have
[46:02]
an additional letter of
[46:03]
support, not in your binder
[46:04]
from the Shepherd Community
[46:08]
Center. We've also included
[46:09]
support from other
[46:10]
jurisdictions where dc Blocks
[46:12]
operates in taps. 26 through
[46:15]
32 because of this engagement,
[46:17]
dc blocks better understands
[46:19]
the community needs including
[46:19]
pedestrian connectivity.
[46:21]
Irvington Plaza in Washington
[46:24]
Square Mall Parks, the Rance
[46:25]
Burger ymca, Common Ground,
[46:28]
the Morehead Resource Center
[46:30]
collaboration, potential with
[46:31]
the Shepherd Community Center
[46:32]
and other community members
[46:33]
and future education
[46:34]
opportunities that both
[46:35]
Irving, 10 community school as
[46:37]
well as the Warren Township
[46:40]
schools. This list is, of
[46:42]
course, not exhaustive of the
[46:43]
community needs, but this list
[46:44]
represents a sample of the dc
[46:44]
connection over the last few
[46:48]
months. Which helped pose has
[46:49]
helped create a better
[46:51]
understanding of future
[46:53]
involvement. Potential dc Box
[46:53]
is absolutely ready to do
[46:56]
great work on the east side.
[46:57]
And mayor eager to work with
[46:58]
dc box for the betterment of
[47:00]
the community as well. Dc
[47:04]
Blacks is unapologetic about
[47:05]
making a community protection
[47:08]
pledge which is in tab 3. This
[47:09]
outlines the zoning
[47:10]
commitments in a manner that's
[47:11]
easier for the public to
[47:13]
digest, but also makes a
[47:16]
commitment of at least 2.5
[47:17]
million dollars for the
[47:18]
community benefit that is
[47:20]
outside any sort of formal tax
[47:21]
discussions. It's simply a
[47:25]
charitable contribution.
[47:27]
Leadership that the United Way
[47:28]
has reached out to host a
[47:29]
listening session with dc
[47:30]
Blocks and counselor heart in
[47:32]
the community on AUGUST 5th,
[47:34]
where we hope we can continue
[47:35]
engaging with the community on
[47:36]
charitable and economic
[47:39]
impact. Let me Orient you to
[47:41]
the site in our specific
[47:43]
request. The site is a total
[47:46]
of 32 acres with 22 acres that
[47:46]
can be developed in the
[47:48]
northwest corner of the
[47:48]
Thunderbird Commerce Center,
[47:49]
which is the old Ford stay on
[47:53]
site. As a former automotive
[47:54]
plant has shown here. This is
[47:56]
an industrial site zoned. I 3
[48:00]
since 1956, a variance of use
[48:03]
is required because edge note
[48:03]
facilities hosting optical
[48:06]
network here are undefined.
[48:08]
The development standards
[48:09]
reduce the parking spots,
[48:11]
providing a positive
[48:11]
environmental impact. The
[48:14]
reply allows the parcels to
[48:17]
correspond to their faces as
[48:19]
the site plan shows phase one
[48:20]
and building one have plans to
[48:22]
be operational within 24
[48:24]
months. S has the capacity to
[48:28]
serve building one with 10
[48:28]
megawatt with just minor
[48:29]
updates to the existing
[48:33]
substation. Building. 2 has a
[48:35]
tenet. And as low density edge
[48:37]
note facility, it's not an ai
[48:38]
data center. We've eliminated
[48:41]
building 3 completely added
[48:42]
more. Green space shifted the
[48:45]
building further to the south.
[48:47]
We've eliminated. 25 backup
[48:48]
generators and remove the need
[48:51]
for 28 megawatts of power. The
[48:51]
project details are on the
[48:54]
side of the slide. I know many
[48:55]
are familiar with the old Ford
[49:00]
to stay on site. This area was
[49:00]
industrial is currently
[49:02]
industrial and has an
[49:04]
industrial future. Monarch is
[49:05]
currently operational just
[49:07]
south of us with 37 truck
[49:10]
based just on Fentayl alone.
[49:11]
Cantley is an industrial
[49:13]
corridor to the West. But the
[49:14]
racetrack, less than a half a
[49:17]
mile from this site, English
[49:17]
is to the south with the
[49:21]
photos of the semis and a s
[49:22]
easement with an active
[49:23]
substation is to the north
[49:24]
separating us from the Penske
[49:28]
Trail. Chelan with highway
[49:30]
like interchanges are to the
[49:31]
east. The atf truck terminal,
[49:33]
which has 96 truck terminals
[49:37]
and 560 parking spaces is
[49:38]
immediate neighbor to the
[49:39]
Pence e on one side and this
[49:41]
project on the other. We are
[49:42]
less than a mile as the crow
[49:45]
flies from the long operating
[49:45]
and not disruptive East Cape
[49:49]
Data center. Dc Box has built
[49:50]
building one just outside of
[49:53]
Atlanta. And we've provided to
[49:54]
ers to counselor Heart the
[49:55]
Indy Chamber. The building
[49:56]
trades the Warren Township
[49:58]
School Board and Irving 10
[50:00]
schools. So we know this
[50:02]
design operates like a quiet
[50:04]
warehouse. Dc Box has
[50:07]
redeveloped in brownfield with
[50:08]
countless similarities to this
[50:11]
specific site in Birmingham,
[50:13]
unbeknownst to dc Blocks, a
[50:13]
Birmingham neighbor testified
[50:16]
about dc box positive impact.
[50:18]
Julie Goldsberry, Ron Phillips
[50:19]
and Carrie Blackwell, a
[50:20]
retired isd firefighter. Found
[50:24]
keys. On their own when they
[50:26]
visited dc blocks in
[50:27]
Birmingham. And as I
[50:28]
understand it, they had a
[50:29]
lovely time meeting with
[50:30]
community members and elected
[50:30]
officials to learn more about
[50:34]
dc box. We've added
[50:35]
commitments to address the
[50:38]
dust, which has a prior
[50:41]
approved with item as well.
[50:42]
But we're thankful for
[50:43]
neighbors like Ron Julian,
[50:44]
Gary, for their attention.
[50:45]
This project is absolutely
[50:47]
better because of them and
[50:48]
their attention to these
[50:49]
details as well as many
[50:53]
others. Today we're joined by
[50:53]
please Challis who has a full
[50:56]
accounting of this brownfield
[50:57]
to answer any questions there
[50:58]
to brownfield letters and
[51:01]
taps. 51 to 52, dc Blacks
[51:02]
would be the 3rd entity to
[51:04]
remediate this specific site.
[51:06]
We did a walking tour with
[51:08]
loss and clues in JUNE to
[51:13]
answer questions. Dc Blocks
[51:15]
has schools as close as across
[51:17]
the fence. You can see in this
[51:18]
aerial here, Huntsville School
[51:24]
is 234 feet away. Where is the
[51:25]
dc blocks facility in
[51:26]
Indianapolis would be more
[51:28]
than 817 feet away from the
[51:30]
building and then the
[51:31]
generators would be on the
[51:34]
backside of that building, the
[51:34]
substation, an easement which
[51:37]
is planned for the expansion
[51:39]
with or without the c block
[51:39]
sits in between us and the
[51:43]
trail in the school. The
[51:43]
school neighbor in Huntsville
[51:44]
has provided a letter
[51:46]
outlining that that they have
[51:47]
not had any issues with the c
[51:48]
block, says their neighbor,
[51:51]
which has been operational for
[51:52]
8 years. That letter is in
[52:00]
tab. 26. Tab. 55 is a no-win
[52:01]
grows for this specific area
[52:01]
which shows the wind is moving
[52:04]
away from the school Epsilon
[52:07]
also noted at the time of the
[52:07]
sound readings in Indianapolis
[52:11]
and tab. 63 63 that the wind
[52:11]
at that time of those readings
[52:12]
was also traveling away from
[52:16]
the school. Dc blocks can
[52:17]
provide a more positive
[52:18]
experience for the school as a
[52:19]
neighbor compared to other. I
[52:22]
3 uses allowed by right? You
[52:24]
can look tab. 44, for
[52:27]
comparison chart of those.
[52:28]
Some of the benefits
[52:29]
highlighted in the trip memo
[52:32]
and tab. 43 show up to an 80%
[52:34]
reduction in traffic, which
[52:35]
means less Chuck diesel
[52:38]
exhaust less beef being
[52:38]
manufacturing waste and
[52:42]
emissions. 9 members from the
[52:44]
school. In addition to 4
[52:45]
members from the Warren
[52:46]
Township school board have
[52:47]
traveled to Atlanta to see
[52:49]
building one. We've added
[52:50]
additional commitments for the
[52:51]
school. And we've even added
[52:52]
them as an entity that can
[52:53]
directly enforced the
[52:56]
commitments. Here is the full
[52:57]
build out rendering which
[53:02]
shows additional green space.
[53:03]
The next slide is I use I 3
[53:06]
uses allowed by right today.
[53:08]
This next slide shows a number
[53:09]
of reasons why the approval of
[53:10]
this variance would benefit
[53:12]
the community over those
[53:15]
existing. I 3 uses allowed by
[53:15]
right, including that data
[53:17]
center projects like this have
[53:18]
little traffic but high wages
[53:22]
and high assessed value dc
[53:23]
Black says a more
[53:24]
environmentally friendly use
[53:25]
than many of those uses on the
[53:26]
Isle 3 list, which is
[53:29]
supported by our environmental
[53:32]
expert reports in tabs. 51 for
[53:33]
59. Tara Kind is here with us
[53:34]
today. If you'd like to ask
[53:37]
them any questions. But it is
[53:38]
worth noting that we would be
[53:39]
applying for the smallest air
[53:43]
permit that item offers and we
[53:44]
have plans to only use one 4th
[53:46]
of the smallest air permit due
[53:47]
to the restrictions that we've
[53:50]
placed on the generators.
[53:53]
We're excited to be joined
[53:56]
today by trades men and women
[53:58]
here today and the Central
[54:00]
Indiana building trades to
[54:01]
assist with this 2 billion
[54:02]
dollar project. And I will let
[54:06]
John say a few words. Please
[54:07]
introduce yourself your
[54:08]
address and have you been duly
[54:13]
sworn? Jon 18? 28 North
[54:14]
Meridian Street. Kind of. Yes,
[54:15]
I have been duly sworn. Thank
[54:18]
you, Mr, welcome. All right.
[54:19]
PRESIDENT And executive
[54:19]
director of the Central
[54:21]
Indiana Building Trades
[54:22]
Council probably representing
[54:23]
over 35,000 men and Women of
[54:24]
the Union construction
[54:26]
industry here in Indianapolis.
[54:26]
We are pleased to announce
[54:29]
that we have executed and
[54:30]
signed a project labor
[54:31]
agreement for this project.
[54:39]
Thank you. Thank you, MR.
[54:41]
Please incorporate our robust
[54:42]
findings of fact and tap 33
[54:43]
and include the exhibit book
[54:43]
in its entirety into the
[54:45]
record. We are in full
[54:47]
agreement. But the staff
[54:48]
report and would draw your
[54:49]
attention to the fact that
[54:50]
this parcel is also in an
[54:51]
industrial reserve, which
[54:51]
means it's prime for
[54:55]
industrial development. The
[54:57]
unit excite with access to
[54:59]
fiber for an edge. No facility
[55:00]
to be adequately located. The
[55:02]
site is just below utility
[55:05]
easement with an a substation.
[55:06]
The data center would generate
[55:08]
fewer trips list, daily
[55:10]
activity less visual impact
[55:11]
than the other I 3 uses as
[55:15]
outlined in the traffic memo.
[55:17]
2 certified independent
[55:18]
Indiana appraisers have
[55:18]
confirmed that the surrounding
[55:19]
property values will not be
[55:21]
affected in a substantially
[55:22]
adverse manner. The full
[55:25]
report can be found in tabs.
[55:27]
47 48 along with a consistent
[55:27]
George Mason University study
[55:30]
and tab. 49 is here with us
[55:32]
today. If you have any
[55:34]
questions, the next slides
[55:37]
show, the robust commitments
[55:39]
dc Box has agreed to pay for
[55:41]
infrastructure generation
[55:41]
transmission and distribution.
[55:42]
So these costs are not passed
[55:46]
on to local customers, dc
[55:46]
boxes also. And this is this.
[55:49]
A big has committed to using
[55:51]
green. Our through Nas Offset
[55:52]
Program, which was important
[55:53]
to counselor Nielsen
[55:55]
constituents in the
[55:57]
neighboring district. You can
[55:58]
see more energy information
[56:00]
and tab 73 through 85 that
[56:02]
show other utilities in
[56:04]
Indiana, including a U.S. Have
[56:06]
projected savings and or rate
[56:07]
decreases due to data center
[56:08]
load offsetting residential
[56:11]
customer burden. This project
[56:12]
will use both waterless
[56:14]
cooling and a closed loop
[56:16]
system. This project at full
[56:18]
build out is proposed to use
[56:20]
less water. Then a single
[56:21]
restaurant. More information
[56:26]
can be found in tabs. 56 58.
[56:27]
The next side. You can see a
[56:29]
view of the Penske trail
[56:31]
showing the berm and the
[56:32]
landscaping on top of the berm
[56:34]
is a double staggered. Rove
[56:36]
evergreen trees. We've worked
[56:37]
closely with District
[56:38]
Councilor and other councilors
[56:39]
staff, the neighborhood on
[56:40]
additional commitments. We've
[56:41]
inspected the generators in
[56:43]
Atlanta and Birmingham on
[56:43]
every tour. The generators are
[56:47]
housed. And only run during
[56:50]
outages are testing testing.
[56:51]
Times are consistent with what
[56:53]
staff requires. Only annual
[56:54]
know annual test during school
[56:55]
session. Dc boxes also
[56:57]
committed to using diesel
[56:58]
particulate filters which kept
[56:59]
or 95% of the particulate
[57:03]
emissions. Epsilon expert
[57:03]
engineer is here with us
[57:05]
today. If you have questions,
[57:08]
we have 3 sound studies at
[57:09]
Thunderbird and the building
[57:10]
in Atlanta, which is the same
[57:11]
as building one. There's a
[57:13]
commitment for sound study
[57:13]
when the equipment is selected
[57:15]
to guarantee 65 db at the
[57:17]
property line. And we also
[57:19]
added a commitment to address
[57:20]
low frequency, which we know
[57:21]
is important to a number of
[57:24]
commissioners. We've addressed
[57:25]
the lighting mitigation, the
[57:26]
closest residential home is
[57:30]
over 743 feet away. There's a
[57:31]
decommissioning plan per
[57:32]
counselor Nielsen's and
[57:35]
unnerving 10 request we've met
[57:38]
last week with trail users in
[57:39]
a project supporter during who
[57:41]
has great ideas for pedestrian
[57:43]
connectivity. We thank her in
[57:45]
the community for bringing
[57:47]
project facts by knocking on
[57:49]
over 3,000 doors. Our list of
[57:50]
supporters he's seen
[57:52]
continuous growth through
[57:54]
education. Today, we're joined
[57:56]
by supporters, neighbors that
[57:57]
rates experts and members of
[57:58]
the project team, which can be
[58:03]
seen on the screen. To close
[58:04]
dc Blocks has made project
[58:05]
reductions they've committed
[58:07]
to pay for energy is a closed
[58:09]
loop system or water list
[58:10]
system provide a significant
[58:12]
buffer. We've addressed sound
[58:13]
the plan of operation clearly
[58:15]
shows the intensity of this
[58:17]
proposed useful not be
[58:18]
increase compared to the
[58:20]
permitted uses. There will not
[58:21]
be a substantial deviation
[58:22]
from care in the neighborhood
[58:24]
character than the permitted
[58:27]
uses. The property is uniquely
[58:28]
suited for high capacity
[58:30]
electric infrastructure due to
[58:31]
its proximity of the 2
[58:33]
facilities and the fiber
[58:36]
network strict application
[58:37]
creates an unusual or
[58:38]
unnecessary hardship because
[58:39]
data centers are not expressly
[58:41]
permitted in any district
[58:43]
under the zoning ordinance and
[58:44]
staff feedback. The proposed
[58:45]
data center cannot proceed
[58:46]
despite the fact that it's
[58:49]
zone for medium industrial and
[58:52]
provides commitments. For
[58:53]
safeguards for the adjacent
[58:54]
properties and the broader
[58:55]
community, the hardship arises
[58:56]
from the ordinance failure to
[58:59]
address the use, not from any
[59:01]
action of the current owner.
[59:03]
Petitioner. Moreover, the
[59:05]
property has been vacant for
[59:06]
20 years. Strict enforcement
[59:07]
of the ordinance result in
[59:10]
significant economic injury by
[59:10]
preventing development that is
[59:11]
otherwise appropriate for the
[59:13]
infrastructure and the zoning.
[59:15]
Our petition also aligns with
[59:16]
the comp plan and our entire
[59:18]
team is available for
[59:19]
questions. I would I should
[59:22]
have made a note. The only
[59:22]
correction from the staff
[59:24]
report is we have increased
[59:27]
the jobs from 17 to 21. And so
[59:34]
that's an update. We time's
[59:35]
members of the commission
[59:36]
questions for the petitioner.
[59:38]
Plus. Councilor place that
[59:44]
podium. So I to question
[59:47]
counselor get go, did I
[59:51]
understand correctly said the
[59:52]
distance from the protected
[59:52]
district or the school is
[59:56]
approximately 800 feet 117
[59:58]
feet from the building and
[59:59]
then the generator sit behind
[1:00:03]
that building. And then what
[1:00:04]
did you say about low
[1:00:08]
frequency? We if you look at.
[1:00:11]
35.
[1:00:21]
It and certain tab, 30 And
[1:00:24]
then if you go to Page 6.
[1:00:34]
Page, 3 of us, 11 under With
[1:00:37]
ups. So we did a sound study
[1:00:38]
to get ambient sound, which is
[1:00:39]
in your binder for the
[1:00:43]
Thunderbird Commerce Center.
[1:00:45]
We also did Epsilon did a
[1:00:46]
review to make sure that when
[1:00:47]
we committed to our original
[1:00:50]
commit was still is 65 db at
[1:00:52]
the property line. We had ups
[1:00:53]
do a review of that. Not with
[1:00:54]
the specific specifications of
[1:00:58]
the equipment, but Ken 65 be
[1:00:58]
achieved. And so that's that's
[1:01:00]
study one. And that's in your
[1:01:01]
binder. Study to is the
[1:01:03]
ambient noise from the
[1:01:04]
Thunderbird Commerce Center.
[1:01:06]
So we know what's happening
[1:01:08]
right now. Now as part of
[1:01:09]
discussion with the school and
[1:01:10]
and other community members
[1:01:14]
is, you know, what are they
[1:01:15]
hearing now and what will they
[1:01:15]
here in dc boxes here? So we
[1:01:19]
we did that say the 3rd study.
[1:01:21]
Was building. One is
[1:01:24]
operational in Atlanta East.
[1:01:24]
And so we did a study of that
[1:01:27]
building. And provided that to
[1:01:31]
you as well. The force sound
[1:01:32]
study that will come after the
[1:01:37]
equipment is picked will be
[1:01:38]
specific to that equipment,
[1:01:40]
making sure that that
[1:01:40]
equipment is not producing any
[1:01:44]
sort of noise. That's louder
[1:01:46]
than 65 at the property line.
[1:01:49]
What we added to that study
[1:01:52]
was addressing low-frequency
[1:01:54]
noise. So I know when you all
[1:01:55]
discussed your guardrails, you
[1:01:58]
had some discussions about a
[1:02:01]
specific number of dbc. The
[1:02:04]
issue with that is the
[1:02:07]
community's goals and dc block
[1:02:09]
schools. Our to not have low
[1:02:10]
frequency. Be an issue, right?
[1:02:12]
No one wants to be to serve dc
[1:02:12]
boxes and want to disturb
[1:02:13]
anyone. The neighbors don't
[1:02:14]
want to be dysart's. We have
[1:02:15]
to find a way to accomplish
[1:02:20]
that. So the issue when you
[1:02:22]
you guys talked about that
[1:02:23]
variant, that Delta and what
[1:02:25]
happens at that Delta. The
[1:02:29]
issue is if you pick. A
[1:02:33]
specific number Epsilon can
[1:02:34]
come up to anything I say. I'm
[1:02:35]
just a layperson when it come
[1:02:38]
when it comes to sound. We
[1:02:40]
didn't think that would
[1:02:42]
achieve Sagal. And so picking
[1:02:43]
a number wouldn't presume
[1:02:44]
produce the results that dc
[1:02:45]
Box once in the community
[1:02:49]
wants. But what can produce
[1:02:51]
that result is sound
[1:02:52]
engineering to address low
[1:02:53]
frequency. And so what we
[1:02:55]
committed to do first. Have
[1:03:01]
the sound study. Look at
[1:03:02]
low-frequency week.
[1:03:03]
Unpredicted off of those
[1:03:05]
specific equipment items and
[1:03:07]
make sure that it's designed
[1:03:09]
and engineered appropriately
[1:03:11]
not to cause low frequency
[1:03:13]
issues. It's important to know
[1:03:14]
dc boxes built these
[1:03:16]
buildings. So we know they
[1:03:18]
haven't had any luck frequency
[1:03:18]
issues at their facilities. We
[1:03:20]
don't want them to have any in
[1:03:21]
the future. And we know we can
[1:03:23]
accomplish this through
[1:03:25]
engineering, but we went one
[1:03:27]
step further. We said we'd
[1:03:28]
summit the message to the
[1:03:31]
administrator and then we also
[1:03:32]
went one step further than
[1:03:35]
that. And we. Said we would do
[1:03:37]
an annual tests which gets
[1:03:38]
submitted to the District
[1:03:39]
Councilor and the
[1:03:41]
administrator. And so let's
[1:03:42]
say something funky happens
[1:03:45]
with the equipment in year 5.
[1:03:47]
There's an annual test every
[1:03:48]
year to make sure that that
[1:03:51]
low frequency is performing
[1:03:53]
the way that it should in
[1:03:57]
relation to va dbc. So that
[1:03:59]
was the way we tackle that to
[1:04:00]
address community members. We
[1:04:02]
did get feedback there on file
[1:04:09]
with Kathleen one of the known
[1:04:11]
for Montz for data centers who
[1:04:13]
excellent work to get into
[1:04:15]
these issues. Emailed us just
[1:04:17]
yesterday and said she was
[1:04:17]
satisfied with our commitment
[1:04:21]
and our how we address
[1:04:22]
low-frequency here. And that's
[1:04:26]
the I I I I I not right that.
[1:04:30]
Yes, I e e I and then I and
[1:04:36]
then I I 3. Yeah. Other
[1:04:36]
questions. Members of the
[1:04:37]
Commission Commissioner
[1:04:38]
Wesley, everything yes,
[1:04:46]
please. And do In the report
[1:04:52]
in 62. Page, 2 of 3 at the
[1:04:55]
bottom. The conclusion is that
[1:04:58]
65 dba is realistic. As a goal
[1:05:01]
to be met and youth. So it is
[1:05:06]
much yes in your discussion.
[1:05:10]
Under 10, I'm 60. About
[1:05:16]
halfway back. You go. Grants.
[1:05:22]
Db. Want access some times and
[1:05:29]
dates or the x axis. You've
[1:05:29]
published dba and bbc results
[1:05:34]
and others as well. Those are
[1:05:37]
from the Atlanta project. And
[1:05:38]
they do show that you're in
[1:05:40]
compliance there with a 65 db.
[1:05:44]
A. Limit. You're under that
[1:05:49]
limit. That's the red line.
[1:05:57]
The Line. Is the bc. And it
[1:05:58]
shows that you'd be under 80
[1:06:06]
db, a limit. And I understand
[1:06:07]
you're not going to
[1:06:08]
necessarily put a number to it
[1:06:11]
because it's just tricky was
[1:06:12]
bbc and it can be cite
[1:06:13]
specific or can be
[1:06:14]
resonant frequencies, Cree
[1:06:19]
both. But where the rubber
[1:06:20]
meets the road is and you said
[1:06:22]
it very well. You don't want
[1:06:24]
to do something bad in the
[1:06:24]
neighborhood. Don't want to
[1:06:25]
have little effect in the
[1:06:27]
neighborhood. Would there be a
[1:06:31]
way? To describe a no result
[1:06:34]
and a remedy? In particular,
[1:06:38]
possibly with the school. And
[1:06:41]
have the number be a hidden To
[1:06:43]
avoid any frivolous complaint.
[1:06:49]
Here's the idea. If the low
[1:06:51]
frequency but you're emitting
[1:06:51]
causes going causes any
[1:06:58]
complaint. With Steph?
[1:06:59]
Teachers, students at the
[1:06:59]
school of glasses rarely are.
[1:07:05]
Choppers are rattling. If it's
[1:07:07]
above a number, could be 85
[1:07:09]
dba some ceiling. Both things
[1:07:10]
were true. Then you'd be there
[1:07:16]
to address it and probably the
[1:07:16]
best way to address that at
[1:07:17]
that point would be dirt or
[1:07:25]
concrete. At that location.
[1:07:26]
And we could even back up one
[1:07:28]
step and say, have you had to
[1:07:30]
comply with bbc requirements
[1:07:32]
in other parts of the country.
[1:07:33]
Is this a thing going on in
[1:07:37]
other parts of the country?
[1:07:38]
Know the answer to that. Your
[1:07:40]
last question is no. And
[1:07:41]
that's why it took us some
[1:07:45]
time to work with Epsilon to
[1:07:45]
better understand kind of how
[1:07:46]
to measure this and try and
[1:07:49]
track the sun include can give
[1:07:53]
some comments. We were. Your
[1:07:54]
idea is one way to look at it,
[1:07:59]
we had looked at discrete
[1:08:00]
tones and other ways to
[1:08:01]
address it. And so that's why
[1:08:02]
we made these commitments
[1:08:03]
because we think there are
[1:08:06]
multiple ways to address it.
[1:08:08]
Do I understand that you have
[1:08:14]
a specific Of a maybe just
[1:08:17]
wondering what can be offered.
[1:08:18]
To guard against a low
[1:08:33]
frequency problem.
[1:08:52]
And let you
[1:08:53]
hear from London in just
[1:08:56]
minute. If you have questions.
[1:09:01]
Your your point well taken. I
[1:09:03]
think what we could to to
[1:09:04]
address that is we so we right
[1:09:06]
now we have an annual sound
[1:09:09]
study which will done to
[1:09:11]
address and reported out. And
[1:09:12]
we're we're one of our
[1:09:13]
commitment is also a website
[1:09:14]
going forward, right? We've
[1:09:17]
been asked to keep our Web
[1:09:18]
site operational so that the
[1:09:20]
community can continue to find
[1:09:21]
documents not to go trace
[1:09:24]
chasing down everywhere. What
[1:09:26]
I think we could do to address
[1:09:27]
your commitment is agree. If
[1:09:31]
we do get a complaint to do an
[1:09:32]
additional sound study within
[1:09:34]
so many. Days or months or
[1:09:39]
whatever. Want to cap that at
[1:09:41]
probably not more than 2 sound
[1:09:42]
studies per year. They
[1:09:42]
equipment's not changing,
[1:09:45]
right. And so what you find at
[1:09:49]
least twice a year you find
[1:09:49]
out. But I think that would
[1:09:54]
help guard against frivolous
[1:09:55]
complaints, but also
[1:09:56]
reactionary to any sort of
[1:09:59]
concerns that we would see if
[1:10:00]
it's that would satisfy your
[1:10:01]
question. We'd be happy to
[1:10:04]
amend the commitments to add
[1:10:05]
an additional sound say. The
[1:10:05]
other thing I would point out
[1:10:12]
is we've added that the war,
[1:10:13]
the District Councilor the
[1:10:14]
Warren Township Development
[1:10:17]
Association and the Irvington
[1:10:18]
schools are enforcing bodies
[1:10:20]
in the commitments as well. So
[1:10:21]
we've given them additional
[1:10:27]
protections there as well.
[1:10:28]
With the same study include
[1:10:28]
the church such as we seeing
[1:10:36]
him. Temp 60. Please introduce
[1:10:37]
yourself, sir. Yeah, good
[1:10:40]
afternoon, Clints year. A lot
[1:10:43]
to so see. It's from 3 Millon
[1:10:43]
main place suite 2.50,
[1:10:45]
Maynard, Massachusetts, 0, 1,
[1:10:48]
7, 5, 4, where you do sworn
[1:10:52]
in. Thank you for seeing. To
[1:10:53]
answer the question, the
[1:10:55]
details of how the
[1:10:56]
post-construction sound study
[1:10:56]
have not been ironed out yet,
[1:10:57]
but that's something that I
[1:11:02]
would work with dc blocks on
[1:11:03]
putting together. So depending
[1:11:05]
on how that studies conducted,
[1:11:08]
it would kind of impact what's
[1:11:09]
presented, for instance, if
[1:11:11]
the measurements are are short
[1:11:14]
in duration, we're unlikely to
[1:11:15]
present to a plot of that
[1:11:16]
data. But if it's over a
[1:11:17]
longer duration than it makes
[1:11:18]
more sense to show it as a
[1:11:18]
plot like you have in front of
[1:11:26]
you. When you see duration,
[1:11:27]
you're not talking about the
[1:11:28]
fast or slow scale. You're
[1:11:31]
talking about over weeks or
[1:11:32]
months, correct. Time duration
[1:11:37]
of the South measurement.
[1:11:37]
Weather. That's 20 minutes.
[1:11:42]
One hour. Boys is not an exact
[1:11:44]
science just offering new be
[1:11:48]
able offer something take care
[1:11:48]
of the school. I don't think
[1:11:49]
that's responsive, though. But
[1:11:51]
that's okay.
[1:12:00]
And please, thank you. We're
[1:12:03]
happy to offer the exact same
[1:12:04]
study it. The methodology is
[1:12:06]
approved by the administrator.
[1:12:07]
And so we're happy to provide
[1:12:08]
the exact same state. That's
[1:12:11]
not an issue at all. Cancer.
[1:12:14]
Please come back. So you're
[1:12:17]
going to make a commitment.
[1:12:18]
Kathleen, that you're gonna
[1:12:20]
provide the study to staff?
[1:12:23]
Kathleen, you get with that's
[1:12:24]
that's in the commitments as
[1:12:27]
they right now. Yes, thank
[1:12:31]
Commissioner else. That's all
[1:12:32]
for the moment. Thank you,
[1:12:34]
PRESIDENT On. Yes,
[1:12:35]
Commissioner Murray. I just
[1:12:36]
want clarify that on the
[1:12:37]
committee. You're going to
[1:12:39]
amplify that that you would
[1:12:40]
conduct a sound study upon
[1:12:45]
receipt of a complaint.
[1:12:46]
However, you would not conduct
[1:12:47]
more than 2 sound studies per
[1:12:55]
annum. Yes, upon studies. Take
[1:13:00]
time. So we. We could commit
[1:13:01]
that upon a noise complaint,
[1:13:02]
we could have a sound study
[1:13:06]
back within 2 months and we
[1:13:07]
would cap the number of annual
[1:13:08]
study Stone studies to no more
[1:13:12]
than 2 per year. And steps.
[1:13:14]
Make a note of that
[1:13:15]
commitment. Yes, I am. Thank
[1:13:19]
you. Thank you. Commissioners.
[1:13:20]
Additional questions
[1:13:25]
yesterday. PRESIDENT Don't I
[1:13:25]
really appreciate the
[1:13:26]
conversation about the
[1:13:30]
decommissioning plan. I think
[1:13:32]
that was amiss in the form of
[1:13:33]
forward this the on plant that
[1:13:37]
was exhausted in 2007. In
[1:13:38]
addition to the plan, other
[1:13:41]
decommissioning plan dollars
[1:13:42]
that will be allocated towards
[1:13:45]
what happens if when distant
[1:13:46]
point in the future. Should
[1:13:48]
this project be successful
[1:13:49]
that the community wouldn't be
[1:13:50]
left with a shell of a
[1:13:51]
building like they were the
[1:13:53]
last time.
[1:14:02]
Commissioner. That's something
[1:14:03]
that we have have looked at.
[1:14:07]
There is. The land is
[1:14:10]
valuable. The building will be
[1:14:11]
after our decommissioning plan
[1:14:13]
is is executed. The building
[1:14:16]
would be left as a concrete
[1:14:17]
industrial shell, which also
[1:14:20]
would be valuable. We had some
[1:14:23]
direct feedback, some from
[1:14:25]
some neighbors in in Irvington
[1:14:27]
that that agreed to that
[1:14:28]
they're asked in it. Take us
[1:14:32]
as far as demolition because
[1:14:34]
of the value that that could
[1:14:37]
be maintained with that. And
[1:14:43]
so not concerned
[1:14:51]
the impact. There's there's no
[1:14:53]
bond it. There's no Lake City
[1:14:54]
bond on this project as some
[1:14:55]
of the other concerns. I think
[1:14:57]
for other projects have then
[1:15:03]
we also did look into.
[1:15:06]
Specific bonds, we came to the
[1:15:09]
conclusion that this is
[1:15:12]
outside the norm for.
[1:15:17]
Industrial type projects and
[1:15:18]
that money is used for this
[1:15:20]
purpose would be better served
[1:15:21]
in the indirectly in the
[1:15:22]
community, providing real
[1:15:24]
economic impact. There. I
[1:15:25]
mean, I think there's
[1:15:26]
something to be said for what
[1:15:27]
happens in the present term.
[1:15:29]
But as we know, things are
[1:15:32]
going to and people at one
[1:15:33]
point in time did never think
[1:15:34]
that we would make sell fewer
[1:15:37]
cars. But we do. And
[1:15:38]
therefore, the plant that was
[1:15:40]
there is no longer there. And
[1:15:41]
the building has sat vacant
[1:15:44]
for 25 years. So being that
[1:15:46]
things change removing already
[1:15:48]
fit fast enough into quantum
[1:15:50]
computing and it's going to
[1:15:51]
change the nature of data
[1:15:52]
centers as the existence of
[1:15:54]
there being planned. Now. So
[1:15:55]
I'm asking in the
[1:15:58]
decommissioning plan that
[1:15:59]
didn't happen before, which I
[1:16:02]
think is a really good step
[1:16:03]
forward. If there can be a
[1:16:04]
conversation of allocation of
[1:16:07]
dollars. So that if the
[1:16:08]
community is not left burdened
[1:16:10]
by something that it doesn't
[1:16:11]
use at any point in the
[1:16:25]
future.
[1:16:48]
Marked a sea. The sea
[1:16:50]
blocks on the chief
[1:16:50]
development officer address
[1:16:55]
10, 40 Crown Point Plaza the
[1:16:56]
land letter, Georgia through
[1:16:57]
3, 3, 8, have even do the
[1:17:00]
think you go ahead. Yeah.
[1:17:01]
These are long-term assets.
[1:17:03]
These these buildings are
[1:17:03]
built a precast, concrete
[1:17:06]
insulated, precast concrete.
[1:17:07]
These have 8200 your life
[1:17:11]
spans for for the building. If
[1:17:12]
we were never if someone were
[1:17:12]
to ever been in this project
[1:17:18]
is likely won't be there. This
[1:17:19]
building would serve.
[1:17:21]
Multitude of uses for
[1:17:22]
additional manufacturing. In
[1:17:26]
addition, the successor.
[1:17:26]
Perhaps not want to pay
[1:17:27]
property taxes on the
[1:17:27]
structure so they would
[1:17:30]
probably demolish a building.
[1:17:31]
What we focused on a nerdy
[1:17:32]
commission was to remove any
[1:17:33]
contaminants, anything that
[1:17:36]
would harm the environment.
[1:17:38]
Batteries, fuel things of that
[1:17:39]
nature. But the structure is a
[1:17:42]
is is is a is a robust
[1:17:43]
structure that could serve a
[1:17:45]
multitude industrial uses for.
[1:17:50]
All of our lifetimes. Does
[1:17:53]
that help at all? I think what
[1:17:54]
the commissioners asking and
[1:17:54]
correct me I'm wrong, we want
[1:17:55]
a commitment that you're going
[1:18:00]
to budget. Budget in your in
[1:18:04]
your ongoing pro forma in the
[1:18:04]
event that this happens, that
[1:18:06]
there's funds that we can see.
[1:18:08]
I think that's inappropriate.
[1:18:09]
Does that make sense to your
[1:18:15]
guests are inappropriate
[1:18:16]
commitment, counselor that
[1:18:17]
they need to make the staff
[1:18:18]
for for the environmental
[1:18:19]
abatement for the
[1:18:20]
environmental protections that
[1:18:21]
we're talking about. Is that
[1:18:22]
correct? I just want make sure
[1:18:25]
we're not. Acts of the ladies
[1:18:28]
and gentleman. My question for
[1:18:29]
were and staff feel free to
[1:18:31]
comment this will be an
[1:18:33]
ongoing subject of
[1:18:35]
conversation. I'm sure But
[1:18:36]
again, back to the nature of
[1:18:37]
where the project is. It
[1:18:39]
already was an industrial
[1:18:40]
facility, but it had a life
[1:18:40]
span that they thought was
[1:18:43]
never going to end. And it
[1:18:45]
did. And it set vacant for 25
[1:18:47]
years being unproductive. It's
[1:18:49]
going to happen again.
[1:18:50]
Regardless of what the
[1:18:51]
building is made of. And so
[1:18:54]
I'm asking just as much as we
[1:18:54]
prepare for infrastructure,
[1:18:57]
like training bridges and
[1:18:58]
railroad bridges and car
[1:18:59]
bridges that they don't last
[1:19:00]
forever. The city has to
[1:19:01]
budget dollars and the
[1:19:03]
PRESIDENT To make sure that
[1:19:03]
their dollars in the future
[1:19:06]
when the think laps. So I'm
[1:19:08]
asking what agreement can be
[1:19:10]
made now for structures like
[1:19:11]
this, because this is such a
[1:19:12]
new type of project and we
[1:19:13]
know things are going to
[1:19:24]
change. We'll agree to budget
[1:19:25]
annual reserves for that
[1:19:26]
purpose reduce it to a written
[1:19:33]
commitment. Kathleen, you got
[1:19:37]
Commissioner. Yeah, that I
[1:19:37]
think I think you present
[1:19:38]
don't I've a question on that.
[1:19:39]
Just smile Murphy, Michael
[1:19:43]
medications answer from a
[1:19:45]
construction standpoint. These
[1:19:46]
structures are some are told
[1:19:49]
concrete panel similar too.
[1:19:51]
And Amazon Distribution Center
[1:19:52]
warehouse in their
[1:19:55]
construction. That correct?
[1:19:57]
These would all likely be the
[1:19:58]
precast panels, structural
[1:20:02]
precast panels with
[1:20:03]
insulation. So even superior
[1:20:05]
tilt up a situation, ok? That
[1:20:06]
generally similar to those
[1:20:10]
type of distribution center
[1:20:11]
where houses much more robust,
[1:20:12]
so much that robotics for the
[1:20:13]
security for the environment,
[1:20:14]
containment, for the for the
[1:20:15]
for the efficiency of the
[1:20:17]
building. And we have dozens,
[1:20:18]
if not, maybe hundreds of such
[1:20:19]
structures in Marion County, I
[1:20:26]
believe. I'm asking staff. We
[1:20:26]
require a decommissioning plan
[1:20:27]
of all of those warehouse
[1:20:31]
structures in Marin County.
[1:20:34]
I'm I'm not aware of
[1:20:34]
decommissioning All those. I'm
[1:20:36]
not either not confident we
[1:20:39]
don't. And so I appreciate
[1:20:40]
your offer and it will put in
[1:20:43]
the record. I understand your
[1:20:47]
point that. Planning to tear
[1:20:47]
these down doesn't make a lot
[1:20:48]
of sense. However, funding
[1:20:50]
that. He's maybe not
[1:20:56]
unreasonable. Thank you.
[1:20:57]
Additional questions from
[1:21:05]
members of the commission.
[1:21:05]
Thank you. Please be prepared
[1:21:08]
for your 5 minute rebuttal.
[1:21:08]
With a reminds traders come
[1:21:14]
forward. And I have a
[1:21:14]
question. Where is Alexander
[1:21:20]
from IPs? My name is
[1:21:21]
Alexandra. In tourney at 85
[1:21:23]
10, every mother was and are.
[1:21:27]
She left? Would you please let
[1:21:28]
her know that? I asked for to
[1:21:29]
come up as on straighter
[1:21:30]
because I wanted to hear what
[1:21:32]
she had to say. In the reminds
[1:21:36]
training period. Didn't know
[1:21:37]
her points. I don't know her.
[1:21:38]
But if I see, I absolutely
[1:21:41]
will. Thank you very much.
[1:21:42]
Honors. I do appreciate your
[1:21:44]
time. I'm not members of the
[1:21:44]
on stretchers. You have 15
[1:21:46]
minutes. Your honors. I
[1:21:50]
introduce yourself. My name is
[1:21:52]
Alexandra Kurland. I represent
[1:21:52]
a community schools and you
[1:21:56]
have been sworn in and your
[1:21:56]
honor. I have not been sworn
[1:21:58]
in because I am not going to
[1:21:59]
talk. I'm going to introduce
[1:21:59]
the board members who are
[1:22:01]
going to talk as they are the
[1:22:01]
ones who live in the Irvington
[1:22:03]
Conchita and sworn in I think
[1:22:06]
you please and it is. So I'm
[1:22:07]
going to introduce Heather,
[1:22:09]
Audrey Nancy do set the clock.
[1:22:11]
Please. If she's going, she's
[1:22:14]
the board of PRESIDENT Of the
[1:22:14]
board and then on Frida and as
[1:22:16]
well as Eric Serrano, who are
[1:22:17]
3 board members who live in
[1:22:18]
Irvington. And we're going to
[1:22:20]
talk to say thank you. Each
[1:22:21]
individual, introduce yourself
[1:22:22]
and still many you've been
[1:22:26]
sworn in. Good afternoon,
[1:22:28]
commissioners. My name is
[1:22:29]
Heather Rodriguez. I am the
[1:22:29]
board chair for every 10
[1:22:30]
community schools and I have
[1:22:34]
been sworn in. Thank you. If
[1:22:35]
you're what's your address?
[1:22:40]
Heather? Our address, but
[1:22:43]
sorry is 57 51 East University
[1:22:43]
Avenue, Indianapolis, Indiana,
[1:22:49]
for 60. When go. Thank you. I
[1:22:50]
as mentioned I have to my
[1:22:52]
colleagues who will be
[1:22:53]
speaking along with Our
[1:22:54]
elementary schools said
[1:22:55]
immediately next to the
[1:22:56]
property that dc Blocks is
[1:23:00]
asking to develop our
[1:23:01]
students. Our families and our
[1:23:01]
staff are the closest
[1:23:04]
neighbors. This project has
[1:23:05]
Irvington Community schools is
[1:23:09]
the appellate here. We filed
[1:23:09]
our uphill on time and our
[1:23:12]
position has not changed. I
[1:23:13]
also want to be direct about
[1:23:15]
something that is public as
[1:23:18]
mentioned already today,
[1:23:20]
members of our board and
[1:23:21]
leadership recently toured ec
[1:23:24]
boxes, Atlanta facility. That
[1:23:25]
was a fact-finding mission and
[1:23:28]
nothing else. We accepted no
[1:23:29]
funds, no guests and no
[1:23:32]
promises of any kind. It was
[1:23:33]
not an endorsement being
[1:23:34]
informed as part of our duty
[1:23:38]
to our students. The building
[1:23:40]
I see us all was only 30%
[1:23:41]
complete. The construction
[1:23:41]
included drilling into a
[1:23:43]
mountain that was so loud that
[1:23:46]
even the generators could not
[1:23:48]
be heard. Even the ICs went to
[1:23:50]
Atlanta. We were unable to
[1:23:51]
discover any meaningful facts
[1:23:55]
during that trip. What what we
[1:23:56]
ask the commission to hold on
[1:23:58]
to is this that burden and a
[1:24:01]
use variance is not on us. It
[1:24:02]
is on dc blocks and it is
[1:24:06]
heavy. My colleagues will walk
[1:24:06]
through the 5 findings. The
[1:24:09]
applicant must approve and why
[1:24:14]
on this record, it cannot.
[1:24:15]
Please introduce yourself your
[1:24:16]
address and have you been
[1:24:17]
sworn? And then a certain
[1:24:23]
place. Ericsson around. Sir,
[1:24:25]
my name is Eric Serrano. I
[1:24:27]
have been sworn my under says
[1:24:28]
51st 7.51 East University
[1:24:32]
Avenue going to be Is a
[1:24:34]
mention my name is Eric
[1:24:35]
Serrano. I'm a member of the
[1:24:36]
Irvington community and the
[1:24:36]
chief information officer of
[1:24:38]
the Jane Pauley Community
[1:24:40]
Health Center located on the
[1:24:41]
East side of Indianapolis Step
[1:24:42]
provides care to over 60,000
[1:24:44]
local residents, mostly
[1:24:46]
children and a member of
[1:24:46]
government and community
[1:24:50]
Schools Board of Governors.
[1:24:51]
Want to start the standard
[1:24:51]
because it frames everything.
[1:24:53]
State law does not ask. But
[1:24:54]
this project improves the site
[1:24:56]
or whether it is a nicer than
[1:24:57]
a warehouse to grant a
[1:24:58]
variance. The commission fined
[1:25:00]
in writing that dc boxes all
[1:25:01]
5, the required findings. The
[1:25:04]
burns entirely an applicant.
[1:25:05]
And if even one fighting feels
[1:25:05]
the variance cannot and should
[1:25:06]
not be granted, I address the
[1:25:10]
first 2. Want to be fair, but
[1:25:11]
what has changed because you
[1:25:12]
are here and have heard a
[1:25:13]
great deal about in the last 2
[1:25:15]
weeks. The applicant reduced
[1:25:16]
their plan from 3 buildings
[1:25:18]
after 2, they brought the
[1:25:19]
power usage down from 78 to 15
[1:25:21]
and for the first time mention
[1:25:24]
the school at all. Those are
[1:25:26]
real changes and we won't
[1:25:26]
dismiss them. But a smaller
[1:25:28]
version of the wrong use in
[1:25:29]
the wrong proceeding is still
[1:25:32]
the wrong thing. And none of
[1:25:33]
these changes answers findings
[1:25:33]
that the law actually
[1:25:34]
requires. That's what I want
[1:25:38]
to show you. Finding one state
[1:25:39]
of the use will not be
[1:25:41]
injurious to public health and
[1:25:41]
safety. The applicant cannot
[1:25:42]
show that and the record its
[1:25:43]
officers. You why start with
[1:25:44]
the noise that we've discussed
[1:25:48]
today. The sound study in the
[1:25:49]
record is one of 10 megawatt
[1:25:50]
building in Atlanta. One 5th,
[1:25:51]
the time the size of the
[1:25:54]
proposed site in Indianapolis.
[1:25:54]
That study does not tell you
[1:25:56]
what will happen next or
[1:25:58]
school. It is the same
[1:25:58]
undersized comparison.
[1:25:59]
Applicant used as its
[1:26:00]
Huntsville facility, which
[1:26:02]
they open art conversations
[1:26:05]
with. And again, just
[1:26:06]
incomparable comparisons that
[1:26:10]
they're trying to make.
[1:26:11]
Applicant now points to a berm
[1:26:11]
to landscaping, to placing
[1:26:12]
building to between itself and
[1:26:14]
the generators in the school.
[1:26:15]
But the noise that matters
[1:26:16]
here is low frequency noise
[1:26:19]
and the low frequency noise is
[1:26:20]
not meaningfully stopped by
[1:26:23]
trees or building wall, a
[1:26:24]
rebuttal in the second in the
[1:26:26]
record explains exactly why.
[1:26:27]
And the 65 just perfect that's
[1:26:30]
been discussed today, measured
[1:26:31]
at the property line has not
[1:26:34]
been independently verified.
[1:26:34]
When we asked we've also asked
[1:26:35]
for the operating loss of the
[1:26:37]
generators to know how often
[1:26:40]
their run and if they're only
[1:26:41]
run during emergency use, we
[1:26:42]
were not provided those logs
[1:26:45]
at all. You just heard minutes
[1:26:46]
ago, they're asking you to
[1:26:47]
take all of the noise,
[1:26:47]
commitments on faith and faith
[1:26:50]
alone. The harm is also
[1:26:50]
understated because nothing
[1:26:51]
actually limits how the site
[1:26:53]
will be run. You've heard of
[1:26:55]
Co multiple times edge note
[1:26:57]
facility that's marketing
[1:26:59]
labels. That's nothing. That
[1:26:59]
doesn't mean anything that
[1:27:00]
doesn't restrict anything or
[1:27:03]
any use for the facility.
[1:27:04]
There's no to restrict how
[1:27:05]
these 86 will operate without
[1:27:05]
restricting the resources that
[1:27:07]
they require to operate and to
[1:27:09]
fix. This is very simple. We
[1:27:11]
can cap the site at 15
[1:27:12]
megawatts and limit the power
[1:27:14]
to any individual rocket. 15
[1:27:16]
kilowatts. Most importantly,
[1:27:17]
those restrictions and to be
[1:27:20]
written in the commitments.
[1:27:21]
Then we talk about the
[1:27:22]
generators even down to 31
[1:27:25]
after the proposed 55 or so
[1:27:29]
diesel generators the
[1:27:29]
commitments now worry that
[1:27:30]
they're only allowed to use in
[1:27:32]
an emergency use, but that
[1:27:32]
emergencies is not clearly
[1:27:39]
defined. The way it reads.
[1:27:41]
Now, nothing stops from
[1:27:42]
running during school day to
[1:27:45]
relieve great stress for
[1:27:45]
financial gain. Demand
[1:27:46]
response, a peak shaving load
[1:27:47]
shutting with I a s that
[1:27:51]
loophole must be close to an
[1:27:51]
emergency must mean an
[1:27:54]
unplanned last of utility
[1:27:55]
power and running for economic
[1:27:56]
dispatch must be flatly
[1:27:58]
prohibited in the commitments
[1:28:00]
and underneath all of it, this
[1:28:01]
person is a former for plant
[1:28:02]
with documented arsenic and
[1:28:03]
thallium contamination and
[1:28:05]
under state environmental
[1:28:05]
covenant and existing recorded
[1:28:08]
condition. And the
[1:28:09]
construction will disturb that
[1:28:10]
soil right next to the
[1:28:12]
children. A record like that
[1:28:12]
is the opposite of a clean
[1:28:17]
showing on health and safety.
[1:28:18]
Finding 2 states that use and
[1:28:19]
value the adjacent area will
[1:28:19]
not be substantially or
[1:28:23]
adversely affect him. The
[1:28:23]
recommendation reviewing came
[1:28:24]
out of a record that did not
[1:28:28]
account for our school at all.
[1:28:29]
Neither the staff report nor
[1:28:29]
the hearing examiner's
[1:28:33]
findings mention it one time.
[1:28:34]
In the last 2 weeks, the
[1:28:35]
applicant has moved building
[1:28:37]
to back estimated an added
[1:28:38]
setback of roughly 280 feet
[1:28:42]
and welcome mat and but that
[1:28:42]
setback is only estimate. It's
[1:28:44]
not confirmed the writing not
[1:28:46]
recorded and Africans
[1:28:46]
conclusion that the site will
[1:28:48]
not be a nuisance rests on the
[1:28:50]
same unverified, probably
[1:28:51]
look. Property line noise
[1:28:55]
figures presented. 11th hour
[1:28:57]
gesture toward the school does
[1:28:57]
not prove the absence of
[1:29:00]
adverse effect. If anything,
[1:29:01]
it concedes that the effect on
[1:29:02]
the school was never seriously
[1:29:03]
measured in the first place
[1:29:04]
earlier this week in a meeting
[1:29:07]
with our school leaders, dc
[1:29:08]
Box even admitted that are
[1:29:09]
relevant. Sound study could
[1:29:09]
not be completed before they
[1:29:12]
want to break ground. I like
[1:29:13]
to reiterate our ask for
[1:29:13]
continuance due to the
[1:29:15]
continued evolution of this
[1:29:16]
project practically by the
[1:29:18]
hour, I've covered to findings
[1:29:19]
both of which fail on the face
[1:29:20]
of the record. My colleague
[1:29:22]
will take part of the other 3
[1:29:23]
and that's where it continues
[1:29:27]
to fall part. Thank you. Thank
[1:29:27]
you, Eric. Please introduce
[1:29:28]
yourself address and have you
[1:29:32]
got for. My name. Is Madison
[1:29:34]
Mon-fri to the address is 5,
[1:29:35]
7, 5, one East University
[1:29:39]
Avenue not been sworn in. Good
[1:29:40]
afternoon. Commissioners, as I
[1:29:42]
said, my name is on Freedom,
[1:29:43]
alumni of the school. And I
[1:29:44]
also on the board. So I'll
[1:29:44]
take the last 3 findings, as
[1:29:47]
my colleague said, funding 3
[1:29:49]
money for the variance arises
[1:29:51]
from a condition killer to the
[1:29:52]
properties of the law means a
[1:29:53]
condition of the land itself.
[1:29:54]
So we're talking shape size,
[1:29:55]
typography. Not what the
[1:29:56]
business want to be built on
[1:30:00]
it. Bloc's does not need does
[1:30:02]
not come from dc blocks needs
[1:30:04]
do not come from any part to
[1:30:06]
keep anything killer about.
[1:30:06]
This parcel comes from its own
[1:30:07]
business plan. What the data
[1:30:08]
center site, there's a
[1:30:12]
hardship of the land. One
[1:30:13]
thing that truly killer about
[1:30:14]
this property that it's
[1:30:15]
contaminated. Former factory
[1:30:17]
and environmental covenant is
[1:30:18]
reason to be more careful
[1:30:19]
about sensitive developed
[1:30:19]
here. Not a reason to grant
[1:30:22]
it. Funding for strict
[1:30:23]
application of the ordinance
[1:30:26]
should be unnecessary
[1:30:27]
hardship, weight, Let go back
[1:30:28]
Russia. Lyle. You talked about
[1:30:33]
the commission plan. Dc when
[1:30:33]
we were in Atlanta, we heard
[1:30:34]
that these buildings would
[1:30:35]
last 50 years and now we're
[1:30:37]
being told 8200. So as my
[1:30:40]
colleague said, these these
[1:30:40]
information points are
[1:30:45]
changing by minute. So funding
[1:30:46]
for stirred up Haitian the
[1:30:46]
ordinance would be an
[1:30:47]
unnecessary hardship. There's
[1:30:50]
no unnecessary hardship lands
[1:30:51]
already. Zoned industrial has
[1:30:52]
many permitted uses available
[1:30:54]
today. The property can
[1:30:55]
already be used when different
[1:30:56]
more profitably use is not a
[1:31:00]
hardship. The law recognizes
[1:31:01]
is the heart of it. Dc box not
[1:31:02]
asking for relief from a
[1:31:02]
hardship. It's asking
[1:31:03]
permanently change with this
[1:31:04]
land MAY be used for. That is
[1:31:08]
rezoning. Rezoning belongs
[1:31:08]
before the City County Council
[1:31:10]
on a full legislative record,
[1:31:12]
not inside a variance
[1:31:13]
proceeding, which is actually
[1:31:13]
where a permanent change like
[1:31:14]
this gets least amount of
[1:31:18]
public accountability. Finding
[1:31:20]
5, the approval not
[1:31:22]
substantially interfere with
[1:31:23]
comprehensive plan. The city
[1:31:23]
is right now in the middle of
[1:31:24]
writing rules for this very
[1:31:27]
kind of facility, moratorium
[1:31:28]
and draft standards that
[1:31:29]
include required buffer from
[1:31:33]
schools from cap on noise.
[1:31:34]
Getting experience today would
[1:31:35]
leapfrog the exact protection
[1:31:36]
cities in the process of
[1:31:37]
adopting this interferes with
[1:31:38]
the plan doesn't conform to
[1:31:43]
it. So that's a 5 burden is on
[1:31:43]
dc blocks to prove every one
[1:31:46]
of them and it feels on each.
[1:31:47]
And the recent changes do not
[1:31:50]
rescue Actions are welcome,
[1:31:51]
but the commitments are still
[1:31:53]
in draft. Not final. Not
[1:31:55]
record. It. A small project
[1:31:56]
does not turn a rezoning into
[1:31:58]
a variance that not carry
[1:31:59]
their burden and are asking
[1:31:59]
you to decide for the record
[1:32:01]
is even complete. Heather will
[1:32:11]
close out. Israeli introduce
[1:32:14]
yourself. Okay. Yes. Hogan,
[1:32:15]
Heather Rodriguez, 57 51 East
[1:32:20]
University Avenue. So you have
[1:32:21]
now heard by dc Blocks cannot
[1:32:22]
meet the findings. Law
[1:32:25]
requires. We recognize the
[1:32:26]
applicant has made changes and
[1:32:28]
we have set so plain fully.
[1:32:30]
But what they're really asking
[1:32:32]
for a permanent change to what
[1:32:33]
this land MAY be used for next
[1:32:36]
to an elementary school. Is a
[1:32:38]
rezoning dressed up as a
[1:32:40]
variance and it belongs before
[1:32:41]
the City County Council with
[1:32:43]
the full record, that process
[1:32:46]
demands for those reasons. We
[1:32:46]
respectfully ask the
[1:32:47]
commission to deny the
[1:32:49]
variance. And if the
[1:32:50]
commission is not prepared to
[1:32:52]
deny today, we ask that you
[1:32:54]
not approve it on this
[1:32:56]
incomplete record that you
[1:32:57]
hold the matter open until the
[1:33:00]
final recorded turns exist.
[1:33:01]
And the school has had chair
[1:33:04]
at fair Chance to review them.
[1:33:06]
This is why we are asking for
[1:33:08]
the continuance. Thank you for
[1:33:09]
your time and your
[1:33:10]
consideration all handed over
[1:33:10]
to Yes, ma'am. Please
[1:33:12]
introduce yourself your
[1:33:14]
address. Megan Latham sworn
[1:33:17]
in. My address is 6, 1, 5, 5,
[1:33:18]
Oak Avenue, Indianapolis,
[1:33:19]
Indiana, one 3rd of a mile
[1:33:20]
away from the fan tail Drive
[1:33:23]
location of even a new resort,
[1:33:24]
leaving a business card at a
[1:33:24]
school's front MAY. And have
[1:33:25]
you been doing swan? Yes.
[1:33:29]
Thank you. Go making a
[1:33:30]
business card of school's
[1:33:31]
front office is not meaningful
[1:33:32]
outreach. And I was deeply
[1:33:33]
disturbed to learn that the
[1:33:35]
petitioner didn't contact the
[1:33:35]
school board until after the
[1:33:37]
first hearing had already
[1:33:39]
passed and only under public
[1:33:42]
pressure. The 5 to 11 year-old
[1:33:43]
students at I c e s are the
[1:33:44]
most vulnerable stakeholders
[1:33:46]
involved in this proposal.
[1:33:47]
Legally. There are 5 findings
[1:33:49]
of fact that are relevant
[1:33:50]
today. If even one fall short,
[1:33:51]
the entire variance is
[1:33:53]
intended to be dismissed. It's
[1:33:54]
a high bar was set that way
[1:33:58]
historically by design. And
[1:33:59]
this petitioners inability to
[1:34:00]
meet that bar is thoroughly
[1:34:01]
evidence exposing critical
[1:34:02]
gaps in the record that no
[1:34:03]
three-ring binder is big
[1:34:07]
enough to explain away. On
[1:34:07]
finding one. The school board
[1:34:09]
has already shared matters of
[1:34:09]
concern that remain
[1:34:10]
unaddressed by the petitioner
[1:34:11]
and offer a brief summary of
[1:34:14]
the remaining 4 as they stand
[1:34:15]
on finding to the petitioners
[1:34:17]
primary property value report
[1:34:18]
opens with a disclaimer
[1:34:19]
acknowledging its own limited
[1:34:20]
basis than looks backward to
[1:34:23]
determine property impacts.
[1:34:25]
Despite 40% of the data center
[1:34:25]
comparable is never having
[1:34:26]
operated during the Integra
[1:34:29]
study at all. None of the
[1:34:29]
comparable Sosa brownfield
[1:34:33]
with an active erc, an active
[1:34:33]
item investigation regarding
[1:34:34]
evidence, public exposure
[1:34:37]
pathways to carcinogens. Vinyl
[1:34:38]
chloride migrating toward a
[1:34:40]
public greenway in elementary
[1:34:41]
school through the
[1:34:43]
contaminated groundwater. But
[1:34:46]
nice The second property value
[1:34:47]
report from echoes the framing
[1:34:48]
in language of the petitioners
[1:34:50]
on council closely enough that
[1:34:51]
it seriously raises questions
[1:34:54]
about its independence on
[1:34:57]
finding three-test peculiarity
[1:34:57]
factors including sized epton
[1:34:58]
access to easements described
[1:35:00]
the entire Thunderbird campus.
[1:35:01]
Their shared conditions of
[1:35:05]
doing business at Thunderbird
[1:35:06]
and Monarch Success. As a
[1:35:07]
conforming I 3 use under the
[1:35:08]
same conditions proved they
[1:35:09]
impose no real limitations to
[1:35:13]
development at all. What staff
[1:35:13]
accepted as peculiar is quite
[1:35:15]
literally ordinary to this
[1:35:18]
park on finding for staff's
[1:35:18]
hardship. Reasoning hinges on
[1:35:19]
the claim that the proposed
[1:35:20]
use is prohibited solely due
[1:35:24]
to the absence listed land use
[1:35:26]
classification. Unfortunately,
[1:35:27]
that's not hardship under
[1:35:29]
Indiana law. It's unknown
[1:35:30]
regulatory gap that applies
[1:35:34]
equally to any parcel in
[1:35:35]
Marion County. Indiana
[1:35:35]
precedent requires the
[1:35:36]
property can't reasonably be
[1:35:38]
put to any conforming use and
[1:35:39]
that loss of profit never
[1:35:41]
constitutes unnecessary
[1:35:42]
hardship. The local developer
[1:35:43]
stated on the record that
[1:35:44]
plenty of other things could
[1:35:46]
go here. Dc Box auto landed
[1:35:48]
new wasn't zone for its
[1:35:49]
purposes. Any so-called
[1:35:52]
hardship has been entirely
[1:35:54]
self-inflicted on finding 5.
[1:35:54]
The comprehensive plan's owned
[1:35:56]
this parcel from medium
[1:35:57]
industrial, which is an
[1:35:58]
increasingly constrained
[1:36:00]
designation. And the 4.65 loop
[1:36:01]
yet staff maintains data
[1:36:03]
centers aligned with light
[1:36:04]
industrial use. Well, also
[1:36:06]
recommending approval for this
[1:36:08]
one today proving I 3 parcels
[1:36:08]
suited perfectly for an
[1:36:11]
approved by right use and
[1:36:12]
denying the opportunity to
[1:36:13]
hard pressed to your base
[1:36:15]
businesses that want to stay
[1:36:17]
local. This is an exchange for
[1:36:20]
21 long-term jobs. Despite
[1:36:22]
their efforts to show to shore
[1:36:24]
up their case. Indiana and
[1:36:25]
Marion County Land use Law
[1:36:25]
gives this commission ample
[1:36:28]
foundation to deny this today
[1:36:30]
our community is reasonable to
[1:36:31]
reject the stas conclusion.
[1:36:31]
And we ask this commission to
[1:36:33]
do the same. This petition
[1:36:34]
should rightfully be denied.
[1:36:37]
Thank you.
[1:36:42]
Please introduce yourself
[1:36:45]
address and have even do a My
[1:36:46]
name is right. Steinhardt my
[1:36:50]
dresses. 1, 1, 5, 3, to
[1:36:50]
Newport, driving up, listening
[1:36:51]
in for 6 to 3, 6. And I'm
[1:36:52]
sorry, your name or more time
[1:36:52]
Rice. Time hurt. Thank you.
[1:36:54]
All right. My voice is very
[1:36:57]
dry and I have been sworn in.
[1:36:59]
So speaking more to counselor
[1:37:00]
Lyles Point. I think that this
[1:37:02]
entire setup edge, you know,
[1:37:04]
that for hyper Scalers could
[1:37:06]
turn us into the ai version of
[1:37:08]
Detroit within a few years
[1:37:09]
that they will just leave us
[1:37:12]
out to dry. Microsoft is
[1:37:12]
already paused construction of
[1:37:15]
their Wisconsin data center.
[1:37:16]
Google or timeline. I here's
[1:37:20]
what I want you come. You get
[1:37:21]
a comeback on rebuttal for 5
[1:37:21]
minutes. So you and the
[1:37:23]
gentleman that's in line. We'd
[1:37:26]
like for you to lead and give
[1:37:26]
your comments as we come back
[1:37:27]
to very much. Thank you very
[1:37:31]
much. Members of the City
[1:37:35]
Council. Counselor heart sure
[1:37:36]
district. Would you like to
[1:37:41]
start? Thank Commissioner
[1:37:42]
COUNCILMAN Nielsen. Please
[1:37:46]
come forward. Let me State one
[1:37:49]
more time. Thank you for being
[1:37:51]
here. We hold you in high
[1:37:52]
regard. I know you're a
[1:37:53]
hard-working city councilor
[1:37:58]
go. You're on a class. Good
[1:37:59]
afternoon. PRESIDENT Dylan
[1:37:59]
commissioners again. My name
[1:38:02]
is Andy Nielsen. City County
[1:38:05]
Councilor for District 14. I
[1:38:06]
come before you today
[1:38:09]
requesting that you deny. 26
[1:38:12]
Tbra 1, 5, and I will probably
[1:38:13]
repetitive to what has been
[1:38:14]
discussed. So I ask that you
[1:38:18]
bear with me. After hearing
[1:38:19]
clearly an overwhelmingly from
[1:38:20]
my district and engaging with
[1:38:20]
the company and their
[1:38:24]
representatives. I do not
[1:38:25]
believe the development will
[1:38:25]
be in the best interest of my
[1:38:28]
constituents and my community.
[1:38:28]
But in recognition of the
[1:38:32]
analysis in front of you. I
[1:38:33]
believe the findings, one 4
[1:38:35]
have not been satisfied
[1:38:36]
requiring that the commission
[1:38:38]
tonight, this petition. It
[1:38:39]
should be noted that the
[1:38:42]
discussion today. During the
[1:38:46]
petitioners. Presentation is
[1:38:46]
the exact basis for which we
[1:38:50]
asked for a continuance. As an
[1:38:50]
example to that, the
[1:38:52]
conversation from commissioner
[1:38:53]
a while with something that I
[1:38:56]
have been asking for since 0.
[1:38:58]
For some background and
[1:38:59]
context. The proposed site
[1:39:01]
sits directly on the border.
[1:39:01]
If you look at your map up
[1:39:04]
there on the border. That is
[1:39:07]
the corner. A district 20.
[1:39:09]
Everything north and east of
[1:39:13]
that, his district, 14.
[1:39:14]
Respect to district lines. My
[1:39:14]
involvement engagement on this
[1:39:16]
position is unique. Given the
[1:39:19]
proximity, the proposed site
[1:39:22]
and that 95 97% of the nearly
[1:39:24]
1800 residents who live within
[1:39:24]
a half mile half mile radius
[1:39:27]
of the proposed site live in
[1:39:28]
district 14. Many of those
[1:39:31]
residents are here today. And
[1:39:32]
as we all know, political
[1:39:32]
lines do not reflect
[1:39:36]
neighborhood boundaries. In
[1:39:38]
late APRIL 2026, held a
[1:39:39]
community forum for neighbors
[1:39:40]
learn more about the from the
[1:39:41]
petition earlier this spring
[1:39:42]
closed a month-long survey
[1:39:45]
collect input from residents.
[1:39:46]
The results from the survey
[1:39:47]
reflect everything that I've
[1:39:49]
heard from text messages calls
[1:39:52]
e-mail social media. He's been
[1:39:52]
to Irvington around the side.
[1:39:53]
You know, you're walking
[1:39:54]
around. Some is going to tell
[1:39:57]
you direct contact with
[1:40:00]
constituents that 83% of my
[1:40:01]
constituents and respondents
[1:40:02]
oppose this development. The
[1:40:07]
context. The context of the
[1:40:07]
commutes position is very
[1:40:09]
important as it was not made
[1:40:11]
with pace is instead an
[1:40:12]
example of how engaged
[1:40:14]
community makes an informed
[1:40:15]
decision and it's not one
[1:40:16]
steeped in anti development
[1:40:17]
fervor which I'll prove later
[1:40:21]
as Wall. Unfortunately, as
[1:40:23]
this process has unfolded. I
[1:40:24]
really don't want to have to
[1:40:26]
say this, but unfortunately,
[1:40:27]
as this process unfolds has
[1:40:30]
become abundantly clear that
[1:40:31]
any potential benefits from
[1:40:31]
this project are fully
[1:40:33]
transactional. I need you to
[1:40:38]
understand that. After months.
[1:40:39]
Months of pushing the company
[1:40:41]
in the representatives for a
[1:40:41]
more comprehensive, thoughtful
[1:40:44]
and meaningful process to
[1:40:46]
discuss potential benefits,
[1:40:47]
the company and the
[1:40:48]
representatives have instead
[1:40:50]
chosen to operate within a
[1:40:52]
silo seeking input from
[1:40:55]
stakeholders and others who
[1:40:55]
are friendly us to their
[1:40:56]
development. The second that
[1:40:59]
pushback is given.
[1:41:00]
Communication lines stay open,
[1:41:02]
but meaningful get engagement
[1:41:03]
has disappeared. And you do to
[1:41:06]
recognize that a good example.
[1:41:06]
One member of the historic
[1:41:07]
Irving and Community Council
[1:41:10]
MAY be supportive of this. The
[1:41:11]
entire community Council your
[1:41:13]
packet has written a letter in
[1:41:14]
opposition. This community
[1:41:16]
meeting on AUGUST, the 4th or
[1:41:17]
the 5th. I found out about it
[1:41:21]
when you all did. And again, I
[1:41:22]
emphasize that the performance
[1:41:23]
bond that was discussed
[1:41:23]
earlier is something that I've
[1:41:29]
been asking for since day one.
[1:41:30]
I say all this while in
[1:41:31]
recognition that the
[1:41:32]
commission is well aware of
[1:41:33]
the sensitivity to these
[1:41:33]
projects, this petition is not
[1:41:36]
new to that conversation.
[1:41:37]
However, it is key that these
[1:41:38]
concerns are also centered and
[1:41:39]
present as we continue this
[1:41:43]
discussion. I appreciate
[1:41:44]
understand the question and
[1:41:45]
analysis before the nbc are
[1:41:46]
focused on ensuring in the
[1:41:48]
case as been discussed in the
[1:41:48]
case of a variance of use that
[1:41:50]
5 findings of fact been
[1:41:52]
satisfied as the embassy in dc
[1:41:54]
as aware as MISTER Serrano
[1:41:56]
emphasize determining that
[1:41:57]
even one finding has not been
[1:41:59]
satisfied is justification. I
[1:42:00]
would say a requirement that
[1:42:03]
you deny this petition and
[1:42:04]
here I will prove that finding
[1:42:05]
one provides the mdc with at a
[1:42:06]
minimum, the discretion to
[1:42:08]
conclude the finding not been
[1:42:09]
satisfied and finding for has
[1:42:11]
not been satisfied on finding
[1:42:15]
one. I believe strongly that
[1:42:16]
the staff report emphasizes a
[1:42:19]
powerful tool that is in your
[1:42:19]
possession commissioners,
[1:42:20]
which is also key to good
[1:42:22]
government public policy.
[1:42:23]
That's discretion. If you read
[1:42:25]
the staff report, staff states
[1:42:26]
in relation to finding well,
[1:42:28]
and finding one and I quote,
[1:42:28]
public testimony and
[1:42:31]
correspondents have race could
[1:42:34]
raise concerns related to
[1:42:35]
potential impacts. Other
[1:42:36]
proposed data center including
[1:42:36]
noise operation of diesel fuel
[1:42:38]
generators and overall energy
[1:42:40]
consumption staff acknowledges
[1:42:41]
these concerns as part of the
[1:42:46]
public record. And took that
[1:42:47]
into consideration during the
[1:42:51]
zoning analysis. An
[1:42:52]
acknowledgement in
[1:42:52]
consideration of the concerns
[1:42:55]
in the staff's analysis is the
[1:42:56]
very basis by which you
[1:42:57]
commissioners MAY deny
[1:42:59]
petition. This is a clear
[1:43:01]
recognition that this process
[1:43:03]
discretion from staff's
[1:43:03]
analysis, community concern
[1:43:06]
and voice has been weighed
[1:43:07]
against several incomplete
[1:43:09]
commitments which remain
[1:43:11]
ongoing, thereby strengthening
[1:43:13]
the community's argument and
[1:43:14]
concern. You have the
[1:43:14]
discretion to provide a more
[1:43:16]
critical analysis that this
[1:43:18]
finding has not been
[1:43:19]
satisfied. Discretion is also
[1:43:20]
abundantly clear in the
[1:43:23]
petitioners on analysis. As I
[1:43:25]
sat there, they spent 7 of
[1:43:25]
their 15 minutes discussing
[1:43:28]
who was in support of Not
[1:43:29]
proving that the findings of
[1:43:32]
fact have been met. Every time
[1:43:34]
a letter of testimony support
[1:43:35]
described presented it is with
[1:43:37]
in this very argument this is
[1:43:38]
a similar application, the
[1:43:39]
same appeal that I'm making to
[1:43:41]
you today when a community
[1:43:42]
group or other stakeholder
[1:43:43]
groups because it position on
[1:43:46]
a petition is considered this
[1:43:47]
introduces a way to now is
[1:43:50]
that, in fact, when discussing
[1:43:51]
finding the nbc does have the
[1:43:53]
discretion to consider
[1:43:55]
community support and or
[1:43:56]
opposition and what is so
[1:43:59]
powerful in this moment is
[1:44:01]
that the staff report
[1:44:02]
acknowledges this allowing the
[1:44:03]
mdc to re Kuwait
[1:44:05]
considerations with in finding
[1:44:09]
one and to conclude that the
[1:44:10]
overwhelming community concern
[1:44:13]
and opposition outweighs any
[1:44:14]
offsets again at best finding
[1:44:17]
one is on unstable grounds.
[1:44:18]
Once you begin to re waited, I
[1:44:20]
maintain that is not been
[1:44:21]
satisfied. And the meeting mdc
[1:44:23]
must deny the petition. Moving
[1:44:27]
on to finding 4 finding 4
[1:44:28]
requires the petitioner
[1:44:28]
demonstrate that, quote, the
[1:44:29]
strict application of the
[1:44:32]
terms of the zoning ordinance
[1:44:34]
constitutes an unusual and
[1:44:35]
unnecessary hardship if apply
[1:44:36]
to the property for which the
[1:44:39]
variant us up the proposed
[1:44:39]
site. Again, this has been
[1:44:41]
discussed is currently zoned.
[1:44:41]
I 3 providing for media
[1:44:42]
industrial use as part of the
[1:44:44]
Thunderbird Commerce Center
[1:44:46]
that was established in 2022.
[1:44:47]
That did say vacant for 20
[1:44:50]
years. But that's not the
[1:44:52]
complete story. Over the past
[1:44:54]
several years. All other
[1:44:55]
parcels within 100 Commerce
[1:44:56]
Center have been or are
[1:44:57]
currently being developed.
[1:45:02]
This very body. Considered
[1:45:05]
petitions for Monarch Beverage
[1:45:05]
that developed for that for a
[1:45:06]
50,000 square-foot facility in
[1:45:08]
2024. Creating roughly 500
[1:45:10]
jobs. This commission also
[1:45:13]
approved rezone and incentives
[1:45:15]
dandy and Louth is finishing a
[1:45:18]
facility by later this fall.
[1:45:20]
Ford and that will create 350
[1:45:22]
jobs just last week. And this
[1:45:25]
very chamber, the City County
[1:45:25]
Council approved the tax
[1:45:26]
abatements that you all set to
[1:45:28]
us. So as we look to the
[1:45:29]
application of what must be
[1:45:31]
satisfied and are fighting
[1:45:33]
force, things are falling
[1:45:35]
apart. Again, the petitioner
[1:45:36]
must satisfy the strict
[1:45:38]
application provides a
[1:45:39]
hardship if we approach this
[1:45:41]
analysis from the petitioners
[1:45:43]
per session, there are
[1:45:43]
remedies within the zoning
[1:45:45]
code that would nullify all of
[1:45:47]
this. A special commercial
[1:45:47]
district zoning
[1:45:51]
classification. That would
[1:45:51]
allow the petitioner to submit
[1:45:54]
for their own set of rules. We
[1:45:54]
wouldn't have to consider this
[1:45:56]
hardship application because
[1:45:57]
the petitioner could submit
[1:46:00]
for this body's consideration.
[1:46:01]
A set of standards to fall
[1:46:01]
outside of a hardship
[1:46:05]
exemption. This commission has
[1:46:06]
approved previous data-center
[1:46:07]
campuses under this
[1:46:10]
application. If we approach
[1:46:11]
analysis from the property
[1:46:12]
owners position, it's
[1:46:13]
abundantly clear that that
[1:46:15]
there's not a hardship with
[1:46:15]
the ability develop the
[1:46:19]
property and I zoning. Why as
[1:46:20]
mentioned earlier, this is the
[1:46:21]
last parcel being developed at
[1:46:23]
the Commerce Center. Without
[1:46:24]
community opposition. I would
[1:46:27]
also point out. For these
[1:46:28]
reasons finding for is clearly
[1:46:29]
not satisfied. Meaning nbc
[1:46:32]
must deny the petition.
[1:46:37]
Commissioners. I recognize and
[1:46:38]
appreciate the questions in
[1:46:41]
front of you. The analysis for
[1:46:42]
the indices focus on ensuring
[1:46:43]
these 5 findings of facts have
[1:46:44]
been satisfied, including that
[1:46:49]
one. Even slightly
[1:46:50]
insufficient. Is security is
[1:46:51]
sufficient to deny the
[1:46:53]
petition. And as I outlined, i
[1:46:53]
believe that finding one of
[1:46:54]
best provides the commission
[1:46:58]
with the discretion necessary
[1:47:00]
to deny and finding 4 has
[1:47:01]
clearly not been satisfied.
[1:47:03]
This is a moment for you all
[1:47:06]
to recognize that for these
[1:47:07]
reasons, the embassy must
[1:47:19]
design petition. Thank But
[1:47:20]
since capture, we'll this
[1:47:25]
time. Good. Thank you,
[1:47:31]
counselor counselor being.
[1:47:31]
Councilor Heart council cross
[1:47:33]
up cancer around at top. No,
[1:47:39]
you're good okay. Council
[1:47:40]
fleas and Michael part
[1:47:44]
representing district MR.
[1:47:45]
PRESIDENT CHAIRMAN. Well,
[1:47:46]
counselor, we appreciate by
[1:47:47]
the way, we appreciate your
[1:47:48]
hard work as well. I
[1:47:53]
appreciate So I'll tell you
[1:47:54]
what's interesting. You know,
[1:47:54]
when I look at this, ladies
[1:47:55]
and gentlemen, thank you. Look
[1:47:58]
at the counter top. As say, a
[1:47:59]
brief story before I get into
[1:48:00]
this. Looking at this map
[1:48:03]
right here because what's
[1:48:04]
interesting about this site
[1:48:04]
is, you know, we talk about
[1:48:06]
where it's located and who it
[1:48:09]
impacts. And when I go back to
[1:48:13]
think it was 2020 to 21, even
[1:48:14]
I was approached by the
[1:48:15]
predecessor of District 14,
[1:48:16]
which was Jason lawyers and
[1:48:17]
counselors and and the city of
[1:48:18]
Indianapolis. And they came to
[1:48:21]
me and they said Councilor
[1:48:22]
Heart, would you be supportive
[1:48:23]
of creating a tiff in this
[1:48:26]
area to support what's going
[1:48:27]
on with Laos development but
[1:48:28]
used that allocation outside
[1:48:30]
of your district. That's a big
[1:48:35]
ask. And I said with pleasure.
[1:48:35]
And the reason I said that is
[1:48:39]
because my vision for the east
[1:48:39]
side east of Indianapolis, the
[1:48:43]
East Washington corridor is it
[1:48:44]
doesn't stop at the district
[1:48:45]
lines of the boundaries. If
[1:48:46]
there was development that was
[1:48:47]
going to happen or Benton,
[1:48:48]
Pleasant West of District 20,
[1:48:49]
that was a good thing. And so
[1:48:53]
I look at this as exactly is
[1:48:54]
the counselor said we're not
[1:48:55]
divided by boundary lines.
[1:48:58]
This is opportunity that we're
[1:48:59]
looking at a redevelopment of
[1:49:03]
an entire plot of land and why
[1:49:04]
that's important is when I
[1:49:05]
look at this and I'll tell you
[1:49:07]
what the process that I went
[1:49:08]
through is a very long one.
[1:49:11]
You know, I've spent weeks
[1:49:12]
every week since this was was
[1:49:15]
opened up and MARCH writing
[1:49:17]
about this in my my letter, my
[1:49:18]
newsletter that I send out
[1:49:21]
weekly called The Sunday Post
[1:49:21]
in that is been weekly
[1:49:23]
meetings with the petitioner
[1:49:24]
community members going on
[1:49:27]
site. I've spent countless
[1:49:28]
hours trying to find the facts
[1:49:31]
of all of these things, but
[1:49:32]
also been a very fortunate
[1:49:33]
position where this is maybe
[1:49:35]
maybe not so fortunate. But
[1:49:36]
the second data center I've
[1:49:39]
had in my district. And so
[1:49:40]
I've been at the ability to
[1:49:43]
actually. Compare these 2
[1:49:45]
things in on the surface. What
[1:49:46]
is extremely different is the
[1:49:48]
plot of land itself. The first
[1:49:49]
time I went through this
[1:49:51]
process, it was with Google.
[1:49:52]
It was a hyper scalers and it
[1:49:55]
was in agricultural area with
[1:49:56]
a lot. And you all seen this a
[1:49:59]
lot of residential around it.
[1:50:01]
This on the other hand is a
[1:50:02]
highly industrial area that
[1:50:04]
this photo itself, it doesn't
[1:50:09]
it? Ladies and gentleman, but
[1:50:09]
the city council are
[1:50:13]
completely statement. Thank
[1:50:15]
But incomplete. A statement
[1:50:18]
council This is a very
[1:50:18]
industrial area that even to
[1:50:21]
the south of it, you have
[1:50:22]
thousands of truck bays. You
[1:50:23]
have metal recycling
[1:50:26]
facilities. You have bakeries.
[1:50:27]
This is not a of an
[1:50:28]
agriculture. This is not a
[1:50:32]
dwelling area and thank you,
[1:50:34]
MR. PRESIDENT so when I look
[1:50:36]
at this, I have to consider,
[1:50:37]
ok, what are we actually
[1:50:40]
putting? And I look at it, 4
[1:50:41]
main buckets. What I'm
[1:50:41]
considering these types the
[1:50:42]
data center development
[1:50:46]
specifically I'm looking at.
[1:50:47]
The quality of life for the
[1:50:48]
folks that are living around
[1:50:48]
it. I'm looking at the energy.
[1:50:52]
I'm looking at the environment
[1:50:52]
and I'm looking at the
[1:50:53]
financial impact of all of it.
[1:50:57]
And so that's what I spent my
[1:50:58]
time doing. And, you know,
[1:50:59]
from a relatively standpoint
[1:51:02]
where I I live close of this
[1:51:03]
where I live in relation to
[1:51:05]
the site is very close to what
[1:51:06]
I lived in relay still live in
[1:51:07]
relation to where the Google
[1:51:10]
site was. The Google site was
[1:51:11]
3 point or 2.2 miles from my
[1:51:12]
house. This is 3.2 miles from
[1:51:14]
my house. So I'm very close to
[1:51:15]
the same amount of distance
[1:51:23]
apart. Ladies and gentleman.
[1:51:24]
Council is going to finish his
[1:51:25]
statement on a interrupted,
[1:51:31]
please. So going through this
[1:51:33]
process, I've had hosted
[1:51:34]
public meetings. Whitehead 100
[1:51:34]
people show up. The
[1:51:38]
petitioners have come and
[1:51:38]
again comparing and
[1:51:39]
contrasting some of the
[1:51:41]
experience I've had the
[1:51:43]
ability to ask questions to
[1:51:43]
the petitioner in this case
[1:51:44]
for us is what I've had in the
[1:51:46]
past has been a very seamless
[1:51:47]
process. If I sent an email
[1:51:50]
phone call a text, it was
[1:51:51]
answered very quickly. They
[1:51:51]
had no problem coming down
[1:51:53]
here. They had no problem
[1:51:54]
taking people out to their
[1:51:57]
sites to see it, which leads
[1:51:58]
me to my example of of I went
[1:52:00]
out to Atlanta to see the site
[1:52:01]
and I took a decibel meter
[1:52:04]
with me and I did that with
[1:52:05]
intent. Now, albeit it was one
[1:52:08]
I got off of Amazon, right? So
[1:52:11]
it was like $30 winter. But my
[1:52:12]
theory being if I use that
[1:52:13]
same meter and every single
[1:52:14]
place that I go, meaning I did
[1:52:18]
it at the site in Atlanta at
[1:52:21]
various stages from the the 75
[1:52:26]
feet 150 feet and 475 feet. I
[1:52:26]
also did it in active
[1:52:29]
construction zone in Atlanta.
[1:52:30]
And I also didn't back here at
[1:52:33]
my house. I did at Lincoln
[1:52:33]
School and I did it in the
[1:52:34]
active area without the
[1:52:37]
development. What I was able
[1:52:38]
to find by learning through
[1:52:39]
that experience is that on the
[1:52:45]
meter itself? A day in my
[1:52:45]
backyard on a Saturday and I
[1:52:47]
live in a regular suburban
[1:52:49]
neighborhood on a day a
[1:52:50]
Saturday night in my backyard.
[1:52:52]
It was 58 decibels. Birds
[1:52:53]
chirp and kids playing to
[1:52:55]
those sorts of things. So when
[1:52:58]
I went to the site itself, it
[1:52:59]
was up to 70 75 decibels. What
[1:53:02]
I want to the school. It was
[1:53:08]
65. At the time. I had a
[1:53:08]
business before the sound
[1:53:09]
studies came out. The
[1:53:09]
conclusion that, wow, it's
[1:53:10]
gonna be really hard. Just to
[1:53:12]
hit 65 again. Chief decibel
[1:53:14]
meters. But I tell you this
[1:53:14]
story because I'm I'm putting
[1:53:15]
in the work to try and learn
[1:53:16]
about the development on the
[1:53:20]
impact. Also put up to very
[1:53:23]
long memos that I submitted
[1:53:24]
prior to the hearing examiner
[1:53:25]
that you all had for a long
[1:53:29]
time now. And that was a lot
[1:53:30]
of finding that I looked into
[1:53:32]
2 main things. The primary
[1:53:32]
thing was the site itself and
[1:53:35]
where it sits as well as the
[1:53:36]
school's relation to that,
[1:53:37]
because I think there's 2 main
[1:53:40]
things that are probably the
[1:53:41]
highest objection here. One is
[1:53:43]
the school to is the noise. I
[1:53:43]
think the noise has been
[1:53:44]
settled through the
[1:53:45]
conversations I've had with
[1:53:47]
how they're going get a lot of
[1:53:49]
that. The school on the other
[1:53:49]
hand, I think it was approved
[1:53:52]
for the recent changes to
[1:53:53]
eliminate a building and moved
[1:53:56]
back even farther 800 feet
[1:53:57]
away. But what was most
[1:53:58]
important in those memos? And
[1:53:59]
I want to make sure I say for
[1:54:01]
the record. Is that that
[1:54:05]
school moved in in when the
[1:54:05]
forward Vist tm plant was in
[1:54:09]
Operation. And so it didn't
[1:54:10]
move. The school didn't come
[1:54:11]
when it was all Greenfield.
[1:54:11]
Nothing else there. They knew
[1:54:13]
when they moved into that
[1:54:17]
location that it's next to an
[1:54:19]
industrial area. And there I
[1:54:19]
mean, that that unity medals,
[1:54:20]
that the Kroger Bakery, all
[1:54:21]
those things were there when
[1:54:24]
that school moved in and going
[1:54:27]
back to the current petition
[1:54:29]
what's coming in now and what
[1:54:31]
I've seen on site is a very
[1:54:35]
benign structure. My gut
[1:54:36]
feeling when I walked up to
[1:54:36]
this thing, I looked at them
[1:54:40]
and I said this is it. This is
[1:54:42]
the building. I walked inside
[1:54:44]
the building and and it is
[1:54:45]
really an edge note facility.
[1:54:46]
There is no doubt about that.
[1:54:47]
And I tell you this from a
[1:54:51]
position of expertise. I've
[1:54:52]
worked in it for my entire
[1:54:52]
career. I have a degree in
[1:54:53]
programming. I have another
[1:54:56]
degree in it. I am expert in
[1:54:57]
the field. I've toward
[1:54:59]
multiple datacenters outside
[1:55:01]
of this one and other
[1:55:02]
petitions. I've toward data
[1:55:05]
center factories. I'm very
[1:55:06]
fun. A fluent to what is going
[1:55:07]
on with these types of
[1:55:12]
developments. Inside the data
[1:55:13]
center itself. I was
[1:55:16]
registering 65 decibels. And
[1:55:17]
why it's an edge. No
[1:55:18]
facilities. Because this is a
[1:55:20]
co-location again, not a hyper
[1:55:22]
scalers the way they designed
[1:55:23]
the building is on the
[1:55:25]
perimeter of it is where we
[1:55:28]
have the where they have the
[1:55:29]
infrastructure where they're
[1:55:29]
bringing in the fiber and
[1:55:30]
creating that redundancy for
[1:55:31]
any particular user in the
[1:55:32]
center of that building. Very
[1:55:37]
unique design. They are
[1:55:38]
providing redundancy on fiber
[1:55:40]
optic networks by having that
[1:55:41]
perimeter operations inside
[1:55:48]
the building. As I look
[1:55:48]
through this and this process,
[1:55:49]
I've taken things
[1:55:50]
consideration like the noise,
[1:55:53]
the dust you know, I've been
[1:55:55]
here through the entire
[1:55:56]
development of Thunder bird
[1:55:57]
from monarch to where it is
[1:55:59]
now. And there's been 0.
[1:56:03]
Vermont runs for dust. Not on
[1:56:04]
dandy, not on Monarch
[1:56:06]
Logistics facility. Not not
[1:56:06]
win. Even Louth was was
[1:56:10]
preparing the site 0
[1:56:11]
Remonstrance and I'm I'm
[1:56:14]
convinced that the the the
[1:56:15]
main issue here is just the
[1:56:17]
name data center, right? It's
[1:56:18]
it's a lot of the unknown of
[1:56:20]
what it actually is going on
[1:56:21]
inside that building inside
[1:56:24]
the building is. Service
[1:56:25]
servers are all over the
[1:56:28]
place. I mean, we've got a man
[1:56:29]
business operations. They are
[1:56:31]
required for our daily lives
[1:56:33]
of this at this point,
[1:56:33]
operation of how we we live
[1:56:36]
in, we work. With that last
[1:56:40]
piece that I look at is. The
[1:56:41]
commitment back to the
[1:56:42]
community. What is this gif
[1:56:43]
with this really going? What
[1:56:46]
would provide benefits one?
[1:56:47]
You know, there's been the
[1:56:48]
complaint about there's not
[1:56:51]
enough jobs. Listen, this
[1:56:52]
entire site development, not
[1:56:55]
just one site. And so we've
[1:56:56]
already got they've got 600
[1:56:59]
and some trucks coming in. To
[1:57:00]
that site. They've already got
[1:57:04]
1000 employees in there. If
[1:57:06]
sitting in site developer,
[1:57:08]
shoes I'm looking at how do I
[1:57:09]
make sure that I'm having
[1:57:10]
adequate site control in the
[1:57:12]
operations of vehicles coming
[1:57:13]
in and out of this entire
[1:57:16]
site. Not just the one there.
[1:57:17]
They have to think about the
[1:57:18]
safety of that. They have to
[1:57:18]
think about the amount of
[1:57:22]
people there and there's not
[1:57:23]
MISS Out thing. There's a
[1:57:23]
negative to it having a little
[1:57:25]
amount of jobs and they've
[1:57:25]
already provided 1000 jobs in
[1:57:29]
the entire site. What I'm
[1:57:30]
proud of is the agreement that
[1:57:32]
they have with the the union
[1:57:36]
because as another distinct
[1:57:37]
difference from the first time
[1:57:38]
ahead, Google come through
[1:57:39]
here. There was no Google or
[1:57:41]
there was no Union agreement.
[1:57:42]
So I'm very proud to see that
[1:57:44]
I'm very supportive of that
[1:57:45]
and I wouldn't be supportive
[1:57:46]
of the project it wasn't
[1:57:47]
there, that that that was a
[1:57:50]
must for me beyond that, it
[1:57:50]
is. We are in a place right
[1:57:54]
now on the council. We just we
[1:57:55]
we just had a real tax come
[1:57:56]
through our proposal for will
[1:57:58]
tax come through because those
[1:58:00]
were doing a lot in relation
[1:58:00]
to send an act bill one and
[1:58:04]
so. As a counselor, I've got
[1:58:05]
to think about the tax base
[1:58:07]
coming to Indianapolis Wright.
[1:58:08]
Is it going to we're going to
[1:58:10]
ask more people for it or are
[1:58:11]
we going to have development
[1:58:14]
pay that tax base? What this
[1:58:16]
type of development provides
[1:58:17]
is 30 million dollars in 10
[1:58:20]
years under abatement. You
[1:58:22]
can't find that in another
[1:58:24]
tight pick, a warehouse,
[1:58:25]
structure type like this and
[1:58:26]
you won't get that type of tax
[1:58:27]
base. We have to consider
[1:58:30]
those types of things. But of
[1:58:31]
that 30 million 10 million
[1:58:33]
goes to the school corporation
[1:58:36]
to Warren Township School
[1:58:36]
Corporation. That's a million
[1:58:40]
dollars a year. You can look
[1:58:43]
across the city of Minneapolis
[1:58:44]
across 8 in the app and
[1:58:44]
Indiana. And you're gonna
[1:58:45]
start to see. We are already
[1:58:46]
seeing the request for
[1:58:48]
referendums in response to
[1:58:50]
Senate Bill one. So we have to
[1:58:53]
find other mechanisms to try
[1:58:54]
and support the school
[1:58:56]
funding. This does that the
[1:58:57]
other piece goes back to that.
[1:58:59]
If I was talking about this
[1:59:00]
puts roughly 10 million
[1:59:01]
dollars in it. If that stays
[1:59:03]
in the district again. And
[1:59:05]
it's not even district 20, to
[1:59:07]
be honest, it's his district,
[1:59:11]
14 that it stays All that is
[1:59:13]
going to go right back to
[1:59:14]
where people live to make the
[1:59:15]
improvements on the roads,
[1:59:16]
driving the plaza to the
[1:59:18]
parks. That's a positive thing
[1:59:18]
that wouldn't happen if the
[1:59:20]
development didn't happen. And
[1:59:21]
there are other types of
[1:59:22]
development that could happen
[1:59:25]
here like. Chemical facilities
[1:59:27]
are unapproved use under I 3
[1:59:30]
today which I am 100%
[1:59:30]
convinced are more invasive
[1:59:32]
than what this type of
[1:59:32]
development is. But even on
[1:59:36]
that. Their community impact
[1:59:36]
payments, right? What they're
[1:59:38]
talking about doing with the
[1:59:38]
school that I mentioned
[1:59:39]
earlier with with winds there,
[1:59:40]
what we're trying to do with
[1:59:43]
that hopefully that works out.
[1:59:44]
If not, there's still 2 and a
[1:59:46]
half million dollars to go
[1:59:48]
towards building 3rd spaces to
[1:59:50]
bring in the type of
[1:59:51]
programmatic activity that
[1:59:51]
leads to more positive
[1:59:54]
outcomes on the east side. I
[1:59:55]
can tell you from of sitting
[1:59:57]
in those seats where I'm on my
[1:59:58]
counselor side getting 2 and a
[1:59:59]
half million dollars to
[1:59:59]
district 20 is a very hard
[2:00:02]
thing to do. And then finally
[2:00:03]
on the other the Washington
[2:00:04]
Square Mall. I mean, that's
[2:00:08]
that's what I have been asked
[2:00:10]
to solve as a counselor from
[2:00:10]
the time I campaigned has to
[2:00:12]
be the counselor. I've been
[2:00:16]
working very diligently for my
[2:00:18]
entire term redo this mall in
[2:00:18]
some fashion. We are getting
[2:00:21]
very close. To positive
[2:00:24]
outcomes and this project
[2:00:25]
itself will add 5 million
[2:00:27]
dollars to an opportunity to
[2:00:29]
improve the Washington Square
[2:00:31]
Mall with which gives me the
[2:00:33]
ability to attract other
[2:00:33]
dollars through grants and
[2:00:35]
through investors that I
[2:00:36]
wouldn't have otherwise to
[2:00:38]
complete my objective of what
[2:00:38]
I promised. The people I would
[2:00:43]
work on. So. With that the
[2:00:44]
last piece will say is on the
[2:00:48]
whole boom or bust thing I
[2:00:49]
have. I'm not convinced that
[2:00:49]
there is bus coming anytime
[2:00:53]
soon on ai. In fact, I still
[2:00:54]
think we're in the very
[2:00:54]
beginning phase of this. And
[2:01:00]
I'll tell you why. So what The
[2:01:02]
normal. People are looking at.
[2:01:04]
Silicon manufactures. So
[2:01:05]
silicon manufacturers are the
[2:01:07]
people that make your cp using
[2:01:07]
your and there are the ones
[2:01:10]
that are powering all that the
[2:01:10]
servers that run the data
[2:01:14]
centers now in we see there
[2:01:17]
running out of supply and
[2:01:19]
they're shifting their units
[2:01:21]
from end user units to server
[2:01:24]
units that is showing a huge
[2:01:25]
demand shift over to that
[2:01:25]
product line. Bush tells us
[2:01:27]
that there's only more and
[2:01:29]
more use. We are only at the
[2:01:30]
first phase of this. We're
[2:01:34]
only at the large. Essentially
[2:01:37]
hyperscale phase where we're
[2:01:38]
companies like meta, Google
[2:01:40]
aws. Those folks are the ones
[2:01:41]
that are building right now.
[2:01:44]
We haven't got to the
[2:01:45]
enterprise layer yet, which
[2:01:46]
are the applications that we
[2:01:47]
use on our daily lives. The
[2:01:48]
canvas, the Quickbooks and all
[2:01:49]
those sorts of things. When
[2:01:49]
you start seeing the ai
[2:01:52]
features integrated into that,
[2:01:52]
they're going to start running
[2:01:53]
their own servers, their own.
[2:01:54]
We're close. They're going to
[2:01:55]
start leasing out space and
[2:01:58]
then you're going to start
[2:01:59]
getting into small medium
[2:02:00]
enterprise businesses that are
[2:02:01]
going to run their own. We're
[2:02:05]
only at the very beginning
[2:02:06]
this structure I am convinced
[2:02:06]
will be here for a long time.
[2:02:09]
I think it will be a product
[2:02:10]
that will produce a lot of
[2:02:11]
revenue for the city of
[2:02:12]
Indianapolis and a lot of
[2:02:13]
positive outcome and
[2:02:15]
charitable distributions.
[2:02:16]
Going forward and MR. CHAIRMAN
[2:02:17]
members of the board, I'm
[2:02:20]
supportive of this project.
[2:02:24]
Thank you. Russians down We're
[2:02:27]
not going to do this. We're
[2:02:31]
not going to do this. We're
[2:02:35]
not going to do this. Members
[2:02:37]
of commission questions
[2:02:43]
Councilor hurt. Cancer. Thank
[2:02:50]
you for being here. Appreciate
[2:02:50]
Thank you. PRESIDENT Dylan,
[2:02:54]
the members of the commission.
[2:02:57]
The matter before you includes
[2:02:57]
2 petitions or to request one
[2:03:01]
is supply at. And that has
[2:03:02]
been explain to you briefly,
[2:03:05]
the other part of that is a
[2:03:05]
variance of use as well as
[2:03:08]
development standards. Like to
[2:03:10]
get rid of earth like to talk
[2:03:12]
about the plant itself. As you
[2:03:14]
know, plats are ministerial
[2:03:18]
that if they meet the certain
[2:03:19]
standards with in the
[2:03:19]
ordinance, it has to be
[2:03:26]
approved. And those conditions
[2:03:27]
that staff is included as
[2:03:32]
staffs report on Page 52 53.
[2:03:34]
There is also a motion. If you
[2:03:35]
choose to approve the staff,
[2:03:37]
the plat, there's a motion on
[2:03:39]
Page. 52, the staff would
[2:03:43]
recommend using. The other. To
[2:03:49]
call out the other. Petition.
[2:03:49]
Request is a variance of use
[2:03:52]
and development standards.
[2:03:53]
There's been a lot of
[2:03:55]
discussion on the variance of
[2:03:57]
use, but staff would like to
[2:03:58]
just briefly mentioned the
[2:03:59]
development standard that was
[2:04:00]
being requested. Is a
[2:04:04]
reduction in parking for
[2:04:05]
industrial uses. And again, it
[2:04:07]
presents an issue in terms of
[2:04:09]
trying to determine exactly
[2:04:11]
what those requirements are in
[2:04:14]
terms of parking because this
[2:04:15]
is not use. It has been
[2:04:17]
contemplated in the ordinance.
[2:04:24]
But they are reducing. The the
[2:04:26]
number of required parking
[2:04:29]
spaces from 330 down to no
[2:04:31]
more or no less than 100
[2:04:34]
parking spaces. Staff support
[2:04:35]
system. Reason why is what it
[2:04:39]
does is it it decreases the
[2:04:40]
amount of hard surface and
[2:04:44]
pavement that is required and
[2:04:45]
it increases them land that
[2:04:46]
can be used for different
[2:04:49]
other different uses, which
[2:04:51]
would include buffering
[2:04:53]
transitional yards and maybe
[2:04:55]
some other industrial uses.
[2:04:56]
And for for those reasons,
[2:04:59]
staff is recommending approval
[2:05:00]
of that development statement
[2:05:01]
and reduction of parking
[2:05:07]
spaces. The other part of the
[2:05:09]
variance request relates to a
[2:05:09]
variance of use. And you've
[2:05:10]
heard a lot about that. And
[2:05:12]
that's the 5 criteria that is
[2:05:18]
required. To prove the
[2:05:19]
variants of you should be
[2:05:23]
granted. The first one talks
[2:05:24]
about the public health safety
[2:05:26]
and general welfare general,
[2:05:31]
where fit welfare staff
[2:05:31]
believes that the proposed
[2:05:32]
commitments that have been
[2:05:34]
submitted and they have been
[2:05:35]
ended a number of times to
[2:05:39]
respond to. Concerns have been
[2:05:40]
raised directly, regulate
[2:05:41]
those operational
[2:05:42]
characteristics of the data
[2:05:45]
center. The campus. That
[2:05:47]
includes Sojourner 8 are
[2:05:50]
testing hours. The sound level
[2:05:51]
and the buffering of the
[2:05:53]
screening that they are
[2:05:56]
providing as well as
[2:05:58]
insulating those generators to
[2:06:01]
minimize the sound. They've
[2:06:05]
also committed to 2 finding or
[2:06:06]
funding electrical
[2:06:11]
infrastructure. And that would
[2:06:12]
ensure the associated cost not
[2:06:15]
borne by local rate payers.
[2:06:18]
They also provided and
[2:06:19]
conducted the trip generation.
[2:06:20]
And again, this gets back to
[2:06:22]
the use as a data center that
[2:06:24]
when it is completed, there's
[2:06:27]
going to be fewer. Trips to
[2:06:30]
that data center. There are
[2:06:32]
fewer employees. There would
[2:06:33]
be security there with the
[2:06:34]
technical people. There would
[2:06:35]
be maintenance. Basically.
[2:06:38]
Those are the 3 categories of
[2:06:38]
people that will going to this
[2:06:46]
data center. And as has been
[2:06:46]
mentioned, watch has happened
[2:06:50]
when with this reduction is
[2:06:52]
this now 72% reduction in the
[2:06:53]
total daily trips that would
[2:06:57]
be going to this site 7 also
[2:07:01]
and with that staff would
[2:07:05]
notice that. Traffic that is
[2:07:06]
going to be generated is going
[2:07:08]
to be more internal. Tale
[2:07:11]
drive is a private street and
[2:07:14]
it access is from English
[2:07:16]
Avenue. So most of the traffic
[2:07:18]
it's going to be from English
[2:07:21]
Avenue into Fentayl Drive. So
[2:07:25]
the impact of the traffic by
[2:07:25]
this development is going to
[2:07:32]
be minimal. Staff. Also
[2:07:33]
believes again that watch has
[2:07:34]
been proposes terms of
[2:07:38]
commitments does protect. Does
[2:07:40]
not create any unregulated or
[2:07:41]
unchecked impact on public
[2:07:51]
health. On adjacent property
[2:07:52]
impacts again, there's been a
[2:07:54]
lot of discussion about this,
[2:07:55]
the school. And I just like to
[2:07:57]
mention that the Pence he
[2:07:59]
trail it separates this
[2:08:01]
property from the school and
[2:08:03]
that Pence, the trail is 80
[2:08:04]
feet wide. And then there's
[2:08:06]
also that buffering. There's
[2:08:09]
easement along that northern
[2:08:11]
portion of that and then has
[2:08:12]
been mention those buildings
[2:08:13]
are going to be south of that.
[2:08:14]
So there's going to be a total
[2:08:18]
of 800 and 17th approximately
[2:08:21]
817 treat separation from the
[2:08:21]
protected district to the
[2:08:28]
North. Staff are also again,
[2:08:29]
about the traffic and where
[2:08:30]
that's going to how that's
[2:08:35]
going to be handled. The
[2:08:36]
uniqueness of the property.
[2:08:36]
And again, it gets back to
[2:08:39]
this is redevelopment of the
[2:08:42]
property that was. Was used
[2:08:45]
for heavy manufacturing over
[2:08:48]
272 acres years ago and
[2:08:52]
because of that. How it was
[2:08:53]
has been developed and how it
[2:08:55]
has now. Return to
[2:08:59]
redevelopment of that. It
[2:09:00]
creates an issue because it is
[2:09:04]
being. Discussed about
[2:09:06]
industrial uses. And we and
[2:09:08]
been mentioned that a data
[2:09:11]
center does not really have a
[2:09:12]
definition in our ordinance.
[2:09:13]
And they're working on that
[2:09:14]
right now. So Steph police
[2:09:16]
because of that, that creates
[2:09:19]
a unique situation. Seth also
[2:09:22]
believes that the data center
[2:09:23]
based upon what we know is
[2:09:26]
would be considered a light
[2:09:27]
industrial use, maybe and I
[2:09:32]
won or night too. Property is
[2:09:34]
owned by 3 and the
[2:09:36]
comprehensive plan recommends
[2:09:38]
heavy industrial so staff
[2:09:38]
again, I'm jumping to that
[2:09:45]
fift. Criteria. Staff believes
[2:09:46]
that issues as it has been
[2:09:47]
defined and how it is being
[2:09:49]
presented today is come is
[2:09:50]
consistent with the
[2:09:52]
comprehensive plan of heavy
[2:09:52]
industrial. There's also been
[2:09:55]
a mention of the over the
[2:09:59]
overlay of an industrial.
[2:10:03]
Industrial over life, which
[2:10:04]
then again, Seth believes is
[2:10:04]
consistent with being proposed
[2:10:08]
here. The unnecessary
[2:10:10]
hardship, the staff talks
[2:10:12]
about in the Senate and the
[2:10:13]
report is the again, the
[2:10:16]
absence of a listed use as a
[2:10:17]
data center. As we know this
[2:10:21]
is you said has recently been
[2:10:24]
brought forth in the
[2:10:28]
forefront. And I I understand
[2:10:28]
there's some other
[2:10:29]
jurisdictions that are
[2:10:30]
struggling with the same thing
[2:10:31]
that we are struggling here in
[2:10:33]
terms of defining it and where
[2:10:37]
it is appropriate. But again,
[2:10:38]
staff believes that is an
[2:10:41]
unnecessary heart hardship. So
[2:10:43]
for these reasons, staff is
[2:10:44]
recommending approval of this.
[2:10:45]
However, before I close, I
[2:10:48]
would like to get back to the
[2:10:48]
comment by Commissioner Lyle
[2:10:52]
relative to. The one to get my
[2:10:58]
notes Budgeting some money. An
[2:11:00]
annual budget. 2 for the
[2:11:01]
removal when this is
[2:11:04]
decommissioned. Staff would
[2:11:08]
also like to add to that is it
[2:11:11]
needs part of that should be
[2:11:14]
and environmental remediation.
[2:11:14]
As part of that
[2:11:17]
decommissioning plan. And
[2:11:18]
again, you know, setting
[2:11:21]
aside. Some type of annual
[2:11:27]
budget for that. But then
[2:11:29]
staff would like to have some
[2:11:31]
clear tight numbers on how
[2:11:33]
much that would be rather than
[2:11:33]
just making a blanket
[2:11:37]
statement. But then again.
[2:11:37]
Staff would be glad to answer
[2:11:38]
any questions to my questions
[2:11:42]
for staff. Commissioner
[2:11:45]
Shurmur 2 weeks ago, we passed
[2:11:47]
petition that went on to the
[2:11:49]
council that regulations for
[2:11:51]
for data centers as we were
[2:11:53]
trying to play catch-up on the
[2:11:54]
whole situation. Yes. How
[2:11:55]
would you can that as an apply
[2:11:56]
to this case? Because this was
[2:11:58]
already in the pipeline, but
[2:12:00]
that is coming out. How would
[2:12:02]
you compare the commitments
[2:12:05]
that we have from the
[2:12:08]
developer to what is in was in
[2:12:08]
the documents that we passed 2
[2:12:12]
weeks ago. I think the
[2:12:14]
commitments that have been hit
[2:12:17]
provided by petitioner. And
[2:12:19]
they have been again, they
[2:12:20]
have been amended through
[2:12:21]
through this whole process to
[2:12:25]
address some of those issues.
[2:12:25]
Seth believes those
[2:12:26]
commitments that they are
[2:12:27]
offering does offer some
[2:12:29]
protection and some regulation
[2:12:30]
on how that data center is
[2:12:35]
going to be regulated and
[2:12:40]
again, I think Because of
[2:12:41]
those we are supportive of
[2:12:46]
this. Do you think anything is
[2:12:47]
glaringly missing? Maybe firm
[2:12:48]
commitments that based on what
[2:12:51]
pushed forward 2 weeks ago.
[2:12:52]
The only thing it is what I
[2:12:53]
just previously mentioned
[2:12:56]
about decommissioning
[2:12:56]
expanding that to include some
[2:13:00]
kind of annual contribution
[2:13:01]
and then also related to that
[2:13:02]
would be an environmental
[2:13:06]
remediation plan. Budget as
[2:13:09]
not contribution budget, I'm
[2:13:10]
sorry for the budget and their
[2:13:13]
numbers. Yes. Is that
[2:13:14]
something that you guys are
[2:13:15]
able to quantify later or how
[2:13:18]
will that be handled? That's a
[2:13:19]
good question because I think
[2:13:22]
this is just been presented.
[2:13:24]
Just come forward here with
[2:13:25]
the petitioners represented.
[2:13:25]
Well, Kathleen, on the of the
[2:13:27]
hard to quantify yeah, in 5
[2:13:28]
minutes and there I agree.
[2:13:32]
Don't you think? Yeah. But
[2:13:33]
we're going to push to get the
[2:13:37]
environmental. Remediation as
[2:13:38]
part of Commissioner Wiles
[2:13:40]
request on commitments and
[2:13:41]
then got to let them work on
[2:13:44]
there. Budging on the number.
[2:13:45]
And yes, and that it has an
[2:13:47]
annual budget. Yes. Further
[2:13:49]
questions for Kathleen.
[2:13:52]
PRESIDENT Bill on. So just to
[2:13:56]
follow up on Bruce, is your
[2:13:58]
comments. Cathy, my
[2:13:59]
recollection of Su 47 amended
[2:14:04]
ordinance that we passed. For
[2:14:06]
data centers provided for a
[2:14:09]
400 foot setback from
[2:14:12]
protected districts. And this
[2:14:15]
is 800 feet 802. Yes, okay.
[2:14:17]
And we provided in that
[2:14:18]
ordinance. I believe 65
[2:14:21]
decibels at the property line.
[2:14:21]
And that's consistent with
[2:14:26]
what their commitment as this
[2:14:29]
Yes. And if this were improved
[2:14:34]
by under and I 3 use. Say it
[2:14:38]
was industry, media
[2:14:39]
manufacturing. Would there be
[2:14:43]
a minimum setback from a
[2:14:43]
protected district? There
[2:14:45]
would And you know what that
[2:14:46]
would? I would not know. I'm
[2:14:47]
sorry. I would have to look at
[2:14:48]
the ordinance on that. Ok?
[2:14:51]
Maybe price check on that. I
[2:14:54]
can verify. I believe it's 150
[2:14:58]
feet. That's what I was 150 or
[2:14:58]
200 years. Only ourselves here
[2:14:59]
with proof I write. It would
[2:15:00]
be much. It could be much
[2:15:03]
closer. That is correct. Yes.
[2:15:07]
And then on medium industrial,
[2:15:08]
is there a decibel level limit
[2:15:10]
at the property line under the
[2:15:10]
current ordinance? No, there
[2:15:16]
is not okay. Further questions
[2:15:22]
for staff. Hearing. None.
[2:15:28]
Petitioner. Hold on one
[2:15:43]
second, please.
[2:15:54]
I'd like to
[2:15:55]
get a commitment from as you
[2:16:01]
start. 4. Inclusive of
[2:16:03]
environmental mediation. That
[2:16:07]
goes with Commissioner Lyles.
[2:16:11]
Commitment request. The
[2:16:12]
verdict given. That's all you
[2:16:13]
got to do's and environmental
[2:16:14]
mediation of appropriate
[2:16:18]
funds. And that needs to be
[2:16:19]
worked out with staff to make
[2:16:21]
sure they are appropriate.
[2:16:22]
Well, that commitment, yes,
[2:16:28]
you do. Yes. Thank you. Yes,
[2:16:30]
commission good. You're on the
[2:16:33]
clock. Go. Thank you. Members
[2:16:36]
of the commission as staff is
[2:16:38]
showing you in a staffer.
[2:16:40]
We're with their commitments.
[2:16:43]
Send their expert opinion that
[2:16:43]
this request meets the
[2:16:48]
findings of facts. The hearing
[2:16:49]
examiner found this case meets
[2:16:51]
the findings of fact under her
[2:16:54]
memo is in your staff report.
[2:16:57]
We have experts here today who
[2:16:59]
have reviewed the specific
[2:17:01]
request and made filings
[2:17:02]
inside your binder and inside
[2:17:05]
the record that show we meet
[2:17:07]
the findings of fact. And to
[2:17:12]
that end. Even remind
[2:17:15]
straighter the land use chair
[2:17:16]
Vinton Community Council
[2:17:20]
stated at their JUNE meeting
[2:17:21]
that we met the legal
[2:17:22]
requirements, specifically the
[2:17:22]
findings of fact, if you look
[2:17:28]
at tab 20 or tap 88 Page 17 at
[2:17:29]
the first full paragraph of
[2:17:30]
that transcript from their
[2:17:31]
JUNE meeting. The link for
[2:17:33]
that video is also in your
[2:17:39]
binder. Dc boxes, bill, these
[2:17:40]
buildings in other
[2:17:41]
jurisdictions. This is not a
[2:17:45]
hypothetical. Exercise. It's
[2:17:48]
not speculation. We know the
[2:17:49]
outcomes unsound. We've done
[2:17:50]
the work to better understand
[2:17:55]
that. The water. From this
[2:17:56]
site is from the employee
[2:18:02]
toilets. The employee kitchen
[2:18:03]
sink in the landscape. That's
[2:18:05]
the only water returning to
[2:18:06]
citizens energy, which is the
[2:18:09]
same as residential uses or
[2:18:10]
commercial uses. And maybe
[2:18:13]
even some industrial uses. We
[2:18:13]
have a decommissioning plan
[2:18:18]
and we are. Appreciate the
[2:18:20]
thoughtful comments so we can
[2:18:21]
incorporate into additional
[2:18:22]
commitment of which we've
[2:18:24]
stated. We're in full
[2:18:26]
agreement. We would be the 3rd
[2:18:28]
and to clean up this
[2:18:29]
brownfield. And we think that
[2:18:31]
is a huge benefit to the
[2:18:32]
community. We believe that
[2:18:34]
cleaning up Brownfields is the
[2:18:37]
right thing to do. Getting
[2:18:39]
these parcels back into the
[2:18:41]
tax base is another big
[2:18:42]
benefit with Brownfield
[2:18:43]
cleanup. This is in compliance
[2:18:47]
with items erc. And so we know
[2:18:47]
that this can be done. There
[2:18:52]
are. 3 buildings and it's been
[2:18:53]
stated and it's in the
[2:18:54]
Irvington Community Council's
[2:18:56]
letter. They did not oppose
[2:18:58]
the construction of monarch
[2:19:03]
abf or Dandy. It's exact same
[2:19:05]
brownfield, its exact same
[2:19:06]
type of construction that we
[2:19:13]
are looking to do please.
[2:19:14]
Believe that edge. No
[2:19:14]
facilities with optical
[2:19:16]
network gear inside, provide a
[2:19:17]
positive benefit for the
[2:19:21]
community. We moved that
[2:19:23]
building by eliminating the
[2:19:24]
other building and moving
[2:19:25]
building to further south. We
[2:19:28]
moved in an additional 237
[2:19:29]
feet to the heart of the
[2:19:30]
industrial complex of the
[2:19:31]
Thunderbird Commerce Center.
[2:19:35]
We have 2 separate property
[2:19:37]
tax appraisers that looked at
[2:19:39]
this specific impact to
[2:19:39]
confirm there are no adverse
[2:19:41]
effects on property owners and
[2:19:43]
it follows the cop plant. We
[2:19:45]
have the sound studies. We
[2:19:48]
have talked with isd. We have
[2:19:50]
the trip memo reviews this. We
[2:19:54]
have done research on air
[2:19:54]
quality with Carrick on. We've
[2:19:58]
done the comparisons. There's
[2:19:58]
a Virginia Department of
[2:20:00]
Environmental report there
[2:20:02]
that shows Loudoun County,
[2:20:03]
which has the most longest
[2:20:05]
serving data centers. He's one
[2:20:10]
of the healthiest counties in.
[2:20:11]
Jen. Yeah, as well as the
[2:20:16]
United States of America. And
[2:20:18]
as it relates to some of the
[2:20:20]
rim on straight ers comments
[2:20:22]
will continue to. Educate
[2:20:25]
folks and meet with folks and
[2:20:27]
have conversations. But I
[2:20:28]
think some of the commitments
[2:20:29]
are addressed in the
[2:20:31]
commitments. They MAY be.
[2:20:32]
Difficult to find and we're
[2:20:35]
happy Continue to work with
[2:20:38]
folks on that. But the
[2:20:40]
generators are restricted to
[2:20:42]
only power outages outside of
[2:20:46]
the control. The property
[2:20:47]
owner. So we've worked with a
[2:20:48]
number of fremont's traders on
[2:20:50]
this language. We've been did
[2:20:52]
up and we've made sure that we
[2:20:55]
have this only for testing and
[2:20:58]
only for power outages.
[2:21:00]
Pacific item also regulates
[2:21:02]
this. Derek Hahn was able to
[2:21:03]
let me know that item
[2:21:04]
regulates this, that the
[2:21:05]
generators are only running
[2:21:07]
when the power's out. And
[2:21:07]
we've agreed to let our
[2:21:09]
neighbors no one are power
[2:21:11]
goes out and win. Those
[2:21:16]
generators will. Used. So we
[2:21:19]
think addressed a number of
[2:21:20]
the concerns and will continue
[2:21:24]
to work too work with the
[2:21:25]
community, educate the
[2:21:26]
community and and discussed
[2:21:33]
how they'll be protected here.
[2:21:37]
Perfect. Thank you. Time to
[2:21:41]
From ice traders, please come
[2:21:41]
forward and rice and the
[2:21:42]
gentleman who was in line. I'd
[2:21:43]
like to make sure you get your
[2:21:50]
thoughts in. Please Nancy
[2:21:54]
Reset the clock. Please
[2:21:56]
introduce yourself. Start
[2:21:58]
over. Even sworn address. Go.
[2:22:00]
My name is right and her. Yes,
[2:22:02]
I have been sworn in. My
[2:22:02]
address is 1, 1, 5, 3, to 4
[2:22:03]
driving Apple's Indiana for 6
[2:22:08]
to 3, 6, I want to point out
[2:22:09]
that I think they're going to
[2:22:12]
make the ai version of that,
[2:22:13]
right? They're going to leave
[2:22:13]
us high and dry the way the
[2:22:15]
market has been changed ever
[2:22:16]
since they introduce token
[2:22:17]
based billing for these ai
[2:22:19]
stuff, companies, smaller
[2:22:20]
enterprise companies have
[2:22:23]
blown their entire annual
[2:22:24]
budget in a than a quarter.
[2:22:26]
You can look at the interview
[2:22:28]
with Uber ceo for that jp
[2:22:28]
Morgan and other major banks
[2:22:29]
increase the risk rating of
[2:22:30]
construction debt for building
[2:22:34]
these data centers as they go
[2:22:39]
into other markets. It's very
[2:22:40]
difficult, not impossible to
[2:22:41]
repurpose these tempted use
[2:22:47]
that very quickly depreciate.
[2:22:49]
And over 60% of all venture
[2:22:49]
capital in the U.S. Last year
[2:22:50]
went I even Google who we know
[2:22:54]
has a lot of cash reserves ran
[2:22:55]
to market to get over
[2:22:57]
80 billion dollars in venture
[2:22:58]
capital before Openai and in
[2:23:00]
Tropic could run to the market
[2:23:01]
to go public and Openai
[2:23:03]
because of their finances
[2:23:04]
showed that the costs
[2:23:06]
increased linearly with
[2:23:07]
revenue. They could not show
[2:23:10]
profit, have pushed them going
[2:23:12]
public 2027 and now they're in
[2:23:12]
a lawsuit for corporate
[2:23:14]
espionage. This is not a
[2:23:16]
standard development. Should
[2:23:16]
not be a variance. The should
[2:23:17]
be going through the proper
[2:23:21]
procedures. So there are some
[2:23:22]
concerns there. I and in
[2:23:24]
support of getting some sort
[2:23:25]
of bond to make sure that
[2:23:27]
we're so well on this. As far
[2:23:31]
as the potential moral to the
[2:23:31]
community. I am concerned that
[2:23:35]
some of that computer would be
[2:23:35]
rented out 2 models like Rock,
[2:23:37]
which have been shown to
[2:23:38]
create child abuse material.
[2:23:41]
What commitments that we have,
[2:23:43]
that if it is found that
[2:23:43]
compute that is being stored
[2:23:45]
is being used for that, could
[2:23:49]
we have that revoked? But how
[2:23:52]
can protect ourselves on that?
[2:23:54]
The concerns about the tax
[2:23:55]
abatements it with how quickly
[2:23:58]
the financial station is
[2:24:00]
changing. Maybe lowering that
[2:24:01]
tax abatement to like 2 years
[2:24:04]
because it's moving very, very
[2:24:06]
quickly. Don't write
[2:24:07]
computational resources to
[2:24:09]
grok and those types of things
[2:24:10]
postpone this for a while
[2:24:11]
until we can have the
[2:24:13]
ordinance for get up. I truly
[2:24:14]
for a year because this is a
[2:24:17]
lot but a positive. Thank you,
[2:24:17]
Reiser. Please introduce
[2:24:20]
yourself and your Be mindful
[2:24:24]
o'clock. Short clock. Steve
[2:24:27]
Key free. 46, north kid Lee
[2:24:27]
Avenue. I love Half mile north
[2:24:29]
of the proposed site. Even
[2:24:30]
Darlie swan. Steve. Yes, I
[2:24:35]
have go okay. Appreciate the
[2:24:38]
opportunity speak. I have 3
[2:24:40]
main questions based on the
[2:24:41]
premise that your decisions
[2:24:41]
based on what's best for the
[2:24:43]
community, not only today, but
[2:24:44]
long term. The first question
[2:24:47]
is based on the usually
[2:24:48]
negative perception of data
[2:24:52]
centers. Whether fair or not
[2:24:55]
has the staff or anyone looked
[2:24:56]
at what is going to be the
[2:24:58]
effect on property values of
[2:25:00]
residential areas within the I
[2:25:04]
love it. I would hate to trade
[2:25:07]
8 income boost right now and
[2:25:09]
watch the east side to
[2:25:09]
neighborhood with her because
[2:25:11]
of the property values as
[2:25:12]
people want to move away from
[2:25:16]
from the data center. Second
[2:25:17]
question and not knowing what
[2:25:21]
how process works. Dc Blocks
[2:25:21]
has made has made many, many
[2:25:25]
pledges add. How is the system
[2:25:27]
set up in there? Is there a
[2:25:28]
way to hold him accountable
[2:25:29]
for the pledge is being made?
[2:25:33]
Who does that and what
[2:25:33]
consequences if they are not
[2:25:36]
meeting their pledges. The 3rd
[2:25:37]
question is kind of related,
[2:25:39]
but it's more balding, a yes,
[2:25:41]
which I understand has made a
[2:25:43]
pledge that the data center
[2:25:45]
will not impact any bodies.
[2:25:48]
Rates. Same question is before
[2:25:50]
is the city or who holds a yes
[2:25:53]
to keep that pledge in the
[2:25:55]
future that the status center
[2:25:56]
data centers are not going be
[2:25:58]
footed on the bills of
[2:26:00]
residential customers. And if
[2:26:02]
they tried to do that, who's
[2:26:02]
going to find it and how will
[2:26:04]
they be held accountable?
[2:26:05]
Appreciate the time. Thank
[2:26:10]
you. See. La sworn in, I'll
[2:26:12]
start my conclusion due to
[2:26:14]
time. They've asked us to
[2:26:16]
trust them repeatedly their
[2:26:17]
best trust them to. But the
[2:26:18]
the record tells a different
[2:26:21]
story. One of repeated
[2:26:21]
mischaracterizations that were
[2:26:22]
quietly corrected only when
[2:26:23]
they're caught never on their
[2:26:24]
own initiative. I have the
[2:26:26]
details are going to them. If
[2:26:28]
I'm allowed. When we asked for
[2:26:29]
real accountability for these
[2:26:29]
commitments, the current
[2:26:30]
statement of commitments
[2:26:32]
answers with these commitments
[2:26:36]
MAY the enforced and the short
[2:26:36]
list of who MAY and forced
[2:26:39]
them notably excludes been
[2:26:40]
counselor who represents 97%
[2:26:41]
of the populace that lives
[2:26:43]
within half of a mile of this
[2:26:45]
project. You're being asked to
[2:26:46]
grant permanent vested rights
[2:26:46]
to a petitioner who has shown
[2:26:49]
again and again that what they
[2:26:50]
tell our community and how
[2:26:51]
they actually intend to
[2:26:53]
operate aren't always the same
[2:26:54]
thing. And they have no
[2:26:55]
intention of allowing us to
[2:26:58]
hold them accountable to that.
[2:26:59]
Addition to their inability to
[2:27:01]
satisfy the 5 findings
[2:27:03]
required for a variance you've
[2:27:04]
really ask that you can that
[2:27:06]
you consider the way to
[2:27:06]
commitments to our community
[2:27:07]
and that light and maintain
[2:27:07]
that the request for a
[2:27:21]
variance be denied. Thank you.
[2:27:21]
Steve. Can you come back up?
[2:27:28]
Please. Let me try to answer
[2:27:29]
your questions because I
[2:27:33]
thought they Asian that. This
[2:27:37]
is very formal record. All the
[2:27:39]
commitments will be in the
[2:27:43]
record if it passes. Those
[2:27:45]
commitments will then be made
[2:27:45]
sure they go to code
[2:27:50]
ordinance. Enforcement and
[2:27:51]
they will follow up along with
[2:27:54]
the dmv to make sure those
[2:27:55]
commitments are being
[2:27:55]
followed. If they are not
[2:27:58]
followed. They literally have
[2:28:00]
the after several warnings
[2:28:01]
have the ability to shut them
[2:28:04]
down. So the answer your
[2:28:05]
question is yes, the
[2:28:06]
commitments are followed up
[2:28:12]
on. They are enforced and
[2:28:13]
frankly, Steve, I pay
[2:28:16]
attention myself. So I'm gonna
[2:28:17]
make sure that they do what
[2:28:18]
they say they're going to do
[2:28:21]
if it passes. Now, your
[2:28:25]
question Help me in on that
[2:28:28]
one. Come back with that. My
[2:28:29]
understanding s has made a
[2:28:30]
pledge. I don't remember if
[2:28:32]
it's just specific to this
[2:28:34]
project or for data centers in
[2:28:35]
general that they had made a
[2:28:38]
pledge that they would not
[2:28:43]
basically pass on the cost or
[2:28:44]
providing power to these this
[2:28:45]
data center bore all the
[2:28:47]
answers. I don't know which
[2:28:51]
and that that would not fall
[2:28:52]
on PRESIDENT Michel rate rate
[2:28:53]
payers. And so the same
[2:28:54]
question is how is that held
[2:28:56]
accountable to that kind a
[2:28:58]
problem us has made that
[2:29:02]
commitment. You are correct.
[2:29:02]
And they are regulated by the
[2:29:05]
State Regulatory Commission
[2:29:06]
and it is on file with the
[2:29:08]
State Regulatory Commission. I
[2:29:10]
you are seaboard and they
[2:29:14]
follow up on how that is being
[2:29:17]
assessed on charges. So it was
[2:29:21]
clearly in their domain. And I
[2:29:22]
think there is a lot of
[2:29:25]
attention right now on the
[2:29:25]
Indian Regulatory Commission
[2:29:28]
and they will stay on top of
[2:29:29]
not only a yes, but all the
[2:29:36]
toys. Thank you, sir. Did this
[2:29:37]
staff lucketts and anything as
[2:29:40]
far as impact on residential
[2:29:41]
property values locations
[2:29:45]
close to data centers has that
[2:29:46]
been looked It has been looked
[2:29:47]
at and has been looked at by
[2:29:49]
several members of the
[2:29:51]
commission. I won't speak for
[2:29:52]
members of the commission, but
[2:29:53]
we've not seen anything that
[2:29:58]
throws off. Values. Thank you.
[2:30:00]
And present PRESIDENT We're
[2:30:03]
paying attention to it.
[2:30:04]
Kathleen, I don't think we
[2:30:08]
have a formal study doing
[2:30:08]
what? No, we do not great.
[2:30:10]
PRESIDENT Delaune Commissioner
[2:30:12]
Murphy. To that end, though
[2:30:15]
petitioner has submitted 2
[2:30:18]
appraisal analysis as part of
[2:30:20]
their evidence or their
[2:30:20]
documents supporting that.
[2:30:22]
There is not military is
[2:30:24]
impact on neighboring property
[2:30:26]
values and those are part of
[2:30:27]
the record that part of what
[2:30:28]
staff review to reach their
[2:30:33]
conclusion. That is correct.
[2:30:34]
It's in the record and we ask
[2:30:35]
you to get them and read get
[2:30:38]
comfortable with it.
[2:30:38]
Appreciate your Thank you for
[2:30:40]
being here. Members of the
[2:30:42]
commission. We're going to go
[2:30:49]
to our ballots. We have to. We
[2:30:49]
have to balance. One is a
[2:30:54]
variance. One of plat, their
[2:30:55]
companion ballots in order to
[2:30:57]
move forward with the plat.
[2:30:57]
We'll vote on it on the
[2:31:01]
ballot. But under under rules
[2:31:03]
and under the law, the
[2:31:03]
Metropolitan Development
[2:31:07]
Commission. Most to prove and
[2:31:09]
fine that the plaque for
[2:31:13]
outdated MAY 28 2026. Complies
[2:31:15]
with the standards of the
[2:31:16]
subdivision regulations
[2:31:18]
subject to the following
[2:31:18]
conditions. The following 11
[2:31:21]
conditions. Kathleen, which
[2:31:26]
are on file with. The filing
[2:31:28]
and the petitioner. Yes yes.
[2:31:33]
There on Page. 52 and 53.
[2:31:34]
Commissioner Murphy that made
[2:31:35]
the motion. Can I get a
[2:31:40]
second? Thank Members of the
[2:31:41]
commission. 2 ballots go to
[2:31:55]
you about
[2:33:23]
First petition is
[2:33:27]
2026 cpa, 8, 1, 5 Dcb
[2:33:29]
Indianapolis llc. There were 7
[2:33:31]
ballots cast. This is the
[2:33:33]
place petition. There were
[2:33:36]
yes, 7, yes votes, 0, no
[2:33:37]
votes. The place has been
[2:33:50]
approved. State income pit
[2:33:52]
petition is a companion
[2:33:53]
variants petition. Again,
[2:33:57]
there were 7 ballots cast.
[2:33:59]
There were 6 yes votes, one,
[2:34:01]
no vote. The petition, the
[2:34:02]
various petition has also been
[2:34:09]
approved. Petition has been
[2:34:10]
passed. This concludes our