Hey, good morning everyone. Thanks for
coming to our Lake County Board of
[0:10]
County Commissioners work session.
First item today's overview and
[0:14]
discussion regarding transportation and
safety related issues on state highways
[0:19]
in Lake County. The topics today
include, but are not limited to, Highway
[0:24]
91 safety, Homestake Trout Club and
other private property access on Highway
[0:30]
24, semi-truck deliveries in Grand View
West, and 2026 pavement and pothole
[0:38]
repair schedule.
This is led by Josh Becker, our deputy
[0:42]
county manager, staff, and Ced.
>> Hey, ready to kick things off. So, uh,
[0:49]
this work session is a combination of a
a number of things that are all traffic,
[0:52]
transportation, and safety related. Um,
we've had commissioner, um, level
[0:57]
requests to discuss some issues. Um,
we've had some some citizen, um,
[1:01]
outreach, you know, requests on certain
safety issues on on various county
[1:05]
roads. So, we sort of packaged all of
this together into one discussion where
[1:09]
we can focus on transportation and
safety throughout the county. Um, and
[1:14]
yeah, this again, this is not limited
necessarily to the topics on hand. So
[1:18]
whatever the commissioners would like to
discuss, we have folks on the room who
[1:21]
can assist um from C do from our staff
as well as members of public to discuss
[1:26]
specific issues. So we do recognize that
our C dot staff can only stay with us
[1:30]
for a short time. So we're going to
start with the highway 91 topic and this
[1:34]
stems from a request from Commissioner
Tharp about conversation we had at the
[1:38]
COT update about a month ago now um to
discuss uh general um potential safety
[1:44]
improvements for Highway 91.
starting point.
[1:48]
» Yeah,
>> welcome back.
[1:49]
» Hi.
>> Hi.
[1:50]
» Glad to be here. This is my colleague
Mark Bunnel. Mark is kind of our lead
[1:54]
safety guy in the office there. So
>> awesome.
[1:59]
» So what can we do? How do we make
Highway 91 safer?
[2:05]
» Actually, I drove
>> I live on mile marker 4 and I did have
[2:11]
one suggestion. Uh is the S turn mile
marker 2. There's three homes there and
[2:17]
I don't know if if we could use a guard
rail there because people get a big head
[2:23]
of speed and then they hit that S turn
and that's where they lose it. And uh I
[2:27]
know there's at least one person that
lives in one of those three homes that's
[2:31]
really tired of having people come in at
100 miles an hour. So I don't know if
[2:37]
you guys could think about doing a a
guardrail just in the S turn. So, one of
[2:42]
the things we we talked about as kind of
an initial solution there would be to to
[2:46]
place chevron signs. So, I don't think
we have those on that curve there right
[2:51]
now. And so, that was probably that's
kind of an easier sort of quicker fix
[2:56]
that we can do as opposed to guardrail,
which
[2:59]
» I see.
>> It's a whole process. So, um I think
[3:02]
» chevron.
>> So, chevrons are the signs. Yeah,
[3:05]
exactly like that. They're you see them
on some curbs and so they're they're
[3:08]
kind of square like this. They're black
and yellow and they have the a kind of
[3:13]
schematic arrows in them.
>> Turning
[3:16]
» reflector.
>> Yeah. Yeah. Reflectors. Absolutely. Mhm.
[3:20]
» And so that was a thought there. Um we
could put them for both directions. Um
[3:24]
so it' probably be a series of maybe
three or four signs, something like that
[3:28]
that that might at least just draw some
more attention to the curve there cuz um
[3:33]
you know, we we have looked at some of
the accident data right there and there
[3:37]
have been a few cars that have gone off
there. Um, I wouldn't say the number was
[3:41]
was huge, but there have been a few. So,
um, that's that's kind of what we're
[3:46]
looking at at the at the moment.
>> Okay.
[3:48]
» What about um mile marker? It looked
like 11 and 12 get dinged a lot on the
[3:55]
stats that were sent
and then between 6 and 12 and 8.
[4:02]
» Those look like hot spots based on your
>> statistics. Are you able to put that in?
[4:10]
or or what we sent or what was sent to
them.
[4:16]
» We're trying to get on Wi-Fi here so we
can
[4:18]
» Oh, yeah. So, do you see there's the
>> or or if you have or if you have the
[4:22]
information that we sent, we can look it
in.
[4:25]
» Yeah. Can we
>> pull that up?
[4:27]
» Candace, can you just It's my computer.
>> Can we go to teams and pull up the stats
[4:33]
from today's session?
I don't think they'll ever sent it to me
[4:39]
from C dot.
>> You'll have to send them to the VOCC
[4:42]
room in an email.
>> No, they're in the packet.
[4:45]
» Are they?
>> They're in a folder that highway
[4:47]
incident data 2026, 2025, and 2024
>> or who is that?
[4:51]
» Oh, is that from Dan Dailyaly?
>> Yes.
[4:53]
» Oh, sorry. That's from Dan.
>> Yeah. So, it's under the fire up. There
[4:56]
you go.
>> Okay. Sorry. I was not sure what you
[4:58]
wanted here.
>> I wasn't sure.
[5:00]
» Which one you want me to pull up?
>> That's what I was referring to. Sorry.
[5:04]
Gotcha.
um any one of them. It's the same. It
[5:08]
looks really similar.
>> Okay. Well, I mean, they're all just
[5:11]
different years in it. I wanted the
specific.
[5:14]
» Okay.
>> So, 6.5 to to 8 were showing up a lot.
[5:18]
And then or mile marker 6.5 to 8 and
then mile marker 11 and 12 if you look
[5:25]
at other years as well.
You want to pull up maybe another ear
[5:29]
because this doesn't have that many.
[5:35]
I can talk about those
>> great. Yeah.
[5:40]
» So, at the county line, what happens is
um the winding blows the snow over the
[5:48]
the bridge right there and it becomes
white out conditions. So, we have a lot
[5:54]
of either head-on collisions or just
people not being able to see at all. And
[6:00]
um we have a lot of accidents there.
the area just past climax that you're
[6:06]
coming down the hill for whatever reason
that that roadway becomes a sheet of ice
[6:12]
but over the years it has gotten better.
Uh I think that that's one of se dots is
[6:17]
on your radar uh because we've had
multiple uh vehicle pileups right there.
[6:24]
The other concern is where we've had a
lot of head-on collisions as well. And
[6:29]
that's going down from uh it's right by
Chalk Creek right there where it's mile
[6:35]
marker. Then you see the statistics
there. It's mile marker between seven
[6:41]
and nine.
>> Mhm.
[6:43]
» That's where it splits into the passing
lane.
[6:45]
» That's correct.
>> Yeah. So many there.
[6:47]
» One of you know you know that's a
problem. Maybe a solution on that one
[6:51]
would be a guard rail because they go
over the edge right there and we've done
[6:55]
over the edge rescues
>> with them going over but also I believe
[6:59]
that that's a passing lane as well.
>> And so if it became a non-passing lane I
[7:05]
don't know if people would
abide by that but at least it's a safety
[7:10]
measure that might be able to put in
place. Um the other it was mentioned the
[7:16]
actual mile marker six which is the
corner.
[7:19]
» Uh I don't know if that one has
>> the signs that you talking about the
[7:24]
chevron chevron signs but mile marker
six all another problem for us and then
[7:31]
and then uh commissioner you brought it
up mall marker between two and three uh
[7:36]
on those corners there. So those are our
our
[7:41]
areas on Highway 91 that we respond the
most on whether it's non-injury or we're
[7:46]
doing auto extrication or we're doing
over the edge or it's major injuries and
[7:50]
deaths.
>> So at the in the 7 to9 area you said
[7:55]
that there were there were issues with
people going off the road but also with
[8:01]
head-ons at the same time there.
>> That's correct. We either we either have
[8:04]
head-on collisions there or the accident
is so bad and vehicles end up over the
[8:11]
edge.
>> Okay.
[8:13]
» And is that that's typically when it's
icy out?
[8:15]
» It's when it's normally when it's icy.
>> But when it's non icy, we had vehicles
[8:22]
go over the edge as well because of the
accident itself. We've had motorcycles
[8:26]
go over the edge
>> right there um during that summer.
[8:31]
» Yeah.
used to be a problem area.
[8:36]
We got a lot of people that are coming
out of Jo Creek during the winter which
[8:40]
which creates an additional issue but
because they snowmobile up there
[8:46]
during the summer that's a great area
[8:52]
popular area on the hillside that's very
sideline
[8:58]
going to the east
[9:04]
corner just before you
to that.
[9:09]
» I know three people directly who have
gone off that edge um just in in the
[9:15]
time that I've been here. And I think
the excessive speeds right there are one
[9:19]
of the biggest contributing factor since
that's a massive downhill and that's
[9:24]
where people who have cars that aren't
even that fast. It's the only spot where
[9:29]
they can pick up speed to make dangerous
passes when they're in a hurry. That's
[9:34]
uh as someone who's made that commute
thousands of times over the last 28
[9:38]
years, that is probably the scariest
spot for people driving dangerously
[9:44]
that big hill.
>> Yeah, absolutely.
[9:49]
» So, could it be pulled up on a map so we
can make sure on the exact curve that
[9:55]
you're talking
[10:07]
It's not cooperating.
That tells me it's connected.
[10:18]
» Maybe Google maps it.
>> Mhm.
[10:29]
Little mousy mouse. Here's
[10:46]
Shot Creek.
>> Okay. Oh, so it's on the It's on the
[10:52]
west side of
>> Yeah. And then this is high. This is
[10:55]
like a massive embankment. So, you go
straight down off the highway here and
[11:00]
then you go straight up
the hillside there.
[11:05]
Right. That's what we're talking about.
>> Mhm.
[11:07]
» And this is where it becomes a passing
lane.
[11:10]
» That's where the climbing lane's at.
>> Yeah.
[11:13]
» Right at the start of the climbing lane.
>> Yep. And
[11:16]
» that's where people try and pass coming
downhill,
[11:19]
» right?
>> It used to be a passing
[11:21]
» It did. They closed it up
>> and then now it's too solid yellow,
[11:24]
which if you've lived here long enough,
you can just disregard that.
[11:29]
Go on the old
>> Well, I I think I think I had a meeting
[11:33]
very similar to this many years ago
where we decided to do that.
[11:37]
» Yeah. I remember.
>> So, yes.
[11:40]
» Well, and the state legislature just
passed a law that increased potential
[11:44]
fines for crossing on a double yellow.
>> Yeah.
[11:48]
» Right there. But this is so many head-on
collisions here, right?
[11:52]
» That's correct.
>> So many. I mean, we all know people who
[11:54]
have
been in significant life-changing
[11:58]
accidents here.
>> Yeah.
[12:01]
» And then I also think where is mile what
is this mile marker, Dan?
[12:06]
» Six.
>> This is the This is nuts here. I'm
[12:11]
astounded we don't have more, but I've
seen countless accidents of people
[12:15]
coming
southbound and there's a there's a
[12:20]
double or there's a do dashed yellow
here and they try to make the pass going
[12:26]
up this way before this turn.
>> That's correct.
[12:29]
» And people here come off the road to try
to avoid a head-on collision. So, and no
[12:35]
matter what the time of year is, you see
that dry, you see that wet. Is that
[12:42]
» Can you screen share? Sorry.
>> Sorry, Andy.
[12:47]
» No, it's okay. I just want to I want to
be able to know what you're you're
[12:51]
pointing out over there.
>> I'm talking about this area here. The
[12:55]
big the big curve.
>> The first big curve as you're coming
[12:58]
down the straightaway.
>> Oh, yeah. There's always cars in the
[13:02]
ditch there. It always cares right here
because they're avoiding a head-on
[13:05]
collision from people passing going
northbound.
[13:08]
» Does anyone get the feeling that that is
an emergency like oh no because of
[13:13]
people pulling in and out of high
country?
[13:18]
» I've seen people I have been a witness
to accidents here where it was a
[13:22]
head-on. They were avoiding a head-on
personally,
[13:26]
» but that's just anecdotal. Is there
signage at the base of that area that
[13:30]
says that there is a passing lane
coming? Because I think part of that is
[13:34]
people are trying to pass, not maybe not
necessarily knowing that there's, you
[13:38]
know, a two-lane climbing lane a mile up
the road. So,
[13:42]
» no, everybody knows. This is like locals
doing.
[13:44]
» These are local.
>> This is not
[13:46]
» local indie car drivers. But I guess
with the I mean what do you think that
[13:50]
would do any mitigation is if we had a
like passing lane ahead sign you know
[13:55]
people can pull off the gas for for a
mile and then wait till that climbing
[13:59]
lane comes. So, we are looking at doing
that um kind of actually as the whole
[14:05]
region goes and we're starting with
Highway 40 because there's a lot of
[14:08]
passing lanes up there and but we're
going to migrate that down here. But I
[14:12]
would probably agree that it's probably
mostly locals that that know that.
[14:16]
» Yep.
>> They're just comfortable and so they're
[14:18]
doing what they think they can do.
>> It's our commuters. Like it's so many of
[14:22]
us just know it really well. Mhm.
>> To just clarify, you're talking about
[14:28]
like the signs that say next passing
lane 2 miles.
[14:32]
» Yeah. You know, thousand feet or
whatever and you see them on other
[14:35]
highways. I'm just curious. I don't
recall if there's one up there. But
[14:38]
» I I'm going to guess not, but I'm not
100% sure.
[14:42]
» Cuz people could be trying to make that
pass because they know it's very short,
[14:46]
you know, passing zone, not realizing
>> trying to get a jump on it.
[14:49]
» Exactly. Well, the passing lane isn't
until Chalk Creek mile marker 11.
[14:56]
» Seven.
>> Oh, it's seven. Okay. Okay.
[15:00]
» Sweet. So, that wouldn't be more than a
mile.
[15:02]
» Mile or so.
>> I'm just saying if it said like it was
[15:06]
four miles, that would make you want to
do it more.
[15:08]
» Sure.
>> I'm not waiting four minutes to pass
[15:13]
this person.
>> I have a second question. And uh I'm not
[15:17]
I know this is super contentious, but
what's your guys' experience with
[15:22]
cameras and speeding tickets? I know
flock is a huge issue, but
[15:28]
» maybe you want to speak to that a little
bit.
[15:31]
» So there is the ability to put speed
cameras pretty much anywhere on on state
[15:37]
highways now due to the legislation that
came into effect actually August 1st
[15:41]
» and some previous legislation. But um we
have three areas in the region where we
[15:47]
have photo enforcement and they're all
three in towns. We have them in
[15:50]
Glennwood, we have them in
Vale, we have them in
[15:57]
have them in Basalt pretty soon here.
>> There might be a third one. But um
[16:02]
» were those real contentious? Did you
have to go through the local community
[16:06]
or is that your
>> Well, so the local community, the local
[16:08]
sheriff's led those efforts. So, it's
it's kind of one where C do DOT's not
[16:13]
really pushing it or we're kind of
impartial to it is what our position is.
[16:18]
So, if if you wanted to do that, um,
basically what would happen is we would
[16:22]
work with the sheriff. They would put
together basically an application and
[16:27]
that would would go through us and also
state patrol to be signed off on and
[16:31]
then that system would be out there. So,
I would say in an area like this
[16:37]
it would be a little bit unusual. I
mean, they're usually mostly in urban
[16:41]
kind of areas. Um, not that it couldn't
be done out here. It's a possibility as
[16:45]
long as there was things like power and
communications and some of that kind of
[16:48]
stuff on the technical side.
>> Um, but um,
[16:53]
any place that there's a lot of
speeding, they they can be put up. Part
[16:56]
of the justification in the application
is citing by how many citations you've
[17:02]
given, what kind of speeds people are
generally traveling. You know, it asks
[17:05]
for some actual data like that. Um,
>> but if all that is, you know,
[17:08]
substantiates the need for cameras, then
then it could be done for sure.
[17:13]
» I can imagine that being real
contentious. And I could also imagine if
[17:17]
there was a sign that said, "Hey,
there's there's a camera coming up,
[17:21]
every single person would slow down."
>> Yeah. I don't know. I'm just saying that
[17:26]
» that's a can of worms for you. Like some
some retail spots have like a you're
[17:31]
smile you're on camera and then it's a
fake camera,
[17:34]
» but it's still a deterrent.
>> Mhm. Is that allowed?
[17:38]
» It wouldn't be effective.
The word would get out.
[17:45]
» A quick question on that. Would it
require a camera for each direction?
[17:50]
Like one for the people heading towards
Leadville and one for people drive. Not
[17:55]
that people will be speeding as much
uphill, but it is still pretty wild
[18:01]
watching people make three wide passes
up there into oncoming traffic. But does
[18:06]
that require two two cameras or does one
camera check both uh all traffic
[18:13]
» there? There's there would be a separate
camera for each direction.
[18:17]
For one thing, they want to try to get
uh license plates on both ends. So, it's
[18:22]
both cameras doing enforcement for both
directions.
[18:27]
» And so, so I I haven't really dug too
much into how some of the communities
[18:31]
have done this, but my understanding is
that they essentially hire a vendor to
[18:35]
come out and design and install the
system and then the vendor is paid
[18:40]
through some of the revenue that's
generated. And it generally works out to
[18:44]
be sort of a revenueish
neutralish to the community. So, it's
[18:48]
really not something that that that
makes money or costs money. It's it's
[18:53]
typically something neutral
>> and that's generally born, like I say,
[18:56]
by a third party.
>> Okay.
[18:58]
» So, um if you start if you want to think
about that either either here or
[19:02]
anywhere, um just know that that's kind
of usually how those deals work.
[19:07]
» Wow, that's contentious. I know people
are cutting them down.
[19:12]
» Yeah. Well, and and to separate that
issue out, Flock is reading license
[19:17]
plates going into a database.
While this is also reading license
[19:21]
plates, they're they're separate
systems.
[19:24]
» Oh, I see.
>> That's you know, Flock is a nationwide
[19:26]
thing, nationwide database. These speed
cameras are the one location and they're
[19:33]
not being paired with other things
around.
[19:36]
» And and these cameras don't even take a
picture of the driver because the driver
[19:40]
is irrelevant,
>> right? So that those are all subtleties
[19:44]
to the cameras out there on the side of
the road that probably most people may
[19:48]
not even believe exist.
>> No, I'm familiar with it because I got a
[19:51]
ticket, but my daughter was in Denver.
She crossed into the the HOV lane.
[19:57]
» Okay. Just crossed in and crossed back
out. That cost me 100 bucks.
[20:01]
» Thanks. Some people pay it.
>> So reiterating and making this crystal
[20:06]
clear for anyone who watches this later
on recording or whatevers. Traffic
[20:11]
cameras are not flock cameras. This is
correct, right?
[20:15]
» That's correct.
>> Okay.
[20:18]
» It's important to make the distinction
though when we're signing a contract
[20:22]
applying for it.
>> Yes.
[20:24]
» So going back to another thing you
mentioned is, you know, there is a
[20:29]
requirement to inform drivers that
camera speed enforcement ahead.
[20:33]
» Yeah. because it's it's intended to be a
safety mechanism to get people to slow
[20:39]
down. It is not to catch people and find
them and and generate revenue. So there
[20:46]
are advanced signs that are required as
part of the deal.
[20:49]
» I mean I hate to be the one that history
will look back on and say, "Oh yeah,
[20:53]
Bullock wanted flock cameras and then
but we could change the highway all day
[20:58]
long. It's really about changing
people's behavior and people aren't
[21:03]
gonna
they're just not going to change their
[21:06]
behavior unless there's some teeth. So,
>> well, wait. Do you want plot cameras?
[21:12]
» Well, they're not plot cameras. They're
traffic cameras.
[21:15]
» I feel like you've made a distinction
has been made. Don't worry.
[21:18]
» I don't know. I'm not saying I want it.
Hope I'm making that clear. I don't not
[21:21]
saying I want it, but seems like an
important part of the
[21:26]
» You know, you know how like um Oh, I'm
sorry, Matt. Go ahead.
[21:30]
» I think it would work. I think it's a
solution that could be explored.
[21:36]
» Go ahead, Andy.
>> Um, other deterrents that I think are
[21:40]
statistically proven to work are just
the sign that has the little blue and
[21:44]
red flashing lights on it when you're
going too fast and how those like sub
[21:49]
just those lights on the on the sign
subconsciously affect people to the
[21:53]
level where they are it's shown that
they will slow down. Um, I don't know if
[21:59]
that's something. It's sort of like that
um uh officer Manny Quinn down in Twin
[22:04]
Lakes.
>> Do we have any old old uh cop cars
[22:09]
laying around that we can just post up
there and see if that makes a difference
[22:12]
in the meantime?
>> I I would think that works once and then
[22:16]
the locals
>> say, "Oh, that's just for the tourists.
[22:20]
It
>> doesn't apply to locals."
[22:22]
» I don't know, man. I still slow way down
when I get into Twin Lakes. Anytime I
[22:27]
see that car sitting there, I know it's
empty. I know there's nothing in there,
[22:30]
but I still slow way down. It just
reminds you like, "Oh, yeah, that's
[22:34]
right.
>> This is a spot."
[22:37]
» I didn't know there was an actual name
for the officer. I know the officer.
[22:41]
That's
>> well respected in the community.
[22:45]
» So, okay, let's get this process
straight. In order to Let's use the
[22:50]
cameras.
In order to get the cameras installed,
[22:54]
we would have to go work with our
sheriff
[22:57]
to fill out an application to see DOT.
>> Correct.
[23:02]
» Okay. And then that in that application,
we have to provide statistics
[23:08]
and based on the statistics that um Dan
Dailyaly has provided us with, what what
[23:14]
more do we need than this kind of
>> so so the main thing is is speed
[23:19]
statistics. And so,
>> okay,
[23:21]
» so in my and I I'm speaking a little bit
out of tone. I'm not 100% because I
[23:26]
haven't gone through the process. I've
just reviewed what I've seen, but um
[23:30]
there's a requirement for a speed study.
>> And so what that entails is it is
[23:34]
entails either going out there with
radar guns or some type of speed
[23:38]
detecting device and showing that X
percentage of of drivers are exceeding
[23:44]
the speed limit by a certain amount. So
you can draw then some conclusions
[23:48]
between okay we've got it signed at 65
55
[23:54]
80% of the people are going 10 miles an
hour over there or something like that.
[23:58]
So there's conclusions like that that
have to be drawn. I believe the vendors
[24:02]
provide those speed studies as part of
their services but I'm not 100% sure on
[24:07]
that. So most of the information most of
the data is is directly speed related
[24:13]
rather than accident related.
Okay,
[24:17]
» if that makes sense. Yeah,
>> it does. It does and it doesn't. So,
[24:22]
what is our avenue to create any
enforcement or like signage
[24:29]
when it comes to accidents?
Like an accident doesn't have to be
[24:33]
speed related,
>> right?
[24:34]
» It can be just reckless driving related.
So, how do we get any of the signage
[24:40]
we've talked about or any of the traffic
measures we've talked about?
[24:44]
So
>> like the sign like the chevrons, how do
[24:47]
we get those?
>> Um so so even for chevrons uh we we have
[24:53]
um standards that we look at basically
say you know you should experience x
[24:59]
number of accidents related to these
signs over a certain time period and if
[25:04]
those thresholds are met with some a
little bit of discretion in there then
[25:08]
we can we can place those signs up. So
that is that is little more than a
[25:14]
request to us to say hey can you take a
look at this
[25:17]
» we if you have in incident data that you
can provide that's helpful um because
[25:22]
the accident data that we use in our
database is doesn't include incidents it
[25:27]
only includes something where an officer
was on scene and and filled out a report
[25:32]
there. So it doesn't include counter
reports or some of the other kind of
[25:36]
things that go out there. So our our
data is not necessarily totally
[25:41]
complete, but it's also very clean if
you understand the sort of boundaries of
[25:46]
what it's for.
>> So So we can audit these locations
[25:49]
ourselves. I was hoping we might be able
to do it right here in front of you, but
[25:53]
we're struggling with this.
>> Sorry.
[25:57]
» Do you want to email us anything?
>> Um,
[25:59]
» we can I can't even connect. Yeah.
>> Otherwise, I would patch into our crash
[26:03]
database and be
>> pulling this what we're seeing on our
[26:08]
» kind of what we'd hoped, but
>> sorry.
[26:10]
» That's all right.
>> Do you have an HDMI? You could maybe you
[26:13]
could just plug you in.
>> Actually, I don't know if we could
[26:17]
maintain the zoom
>> to go to that level at this point. So,
[26:20]
» I mean, you sent us an email just as as
a formal request. Please look at these
[26:26]
curves for us,
>> okay? and we'll take it from there,
[26:29]
which then means that
um if we get to that point, then CEO
[26:34]
just installs them.
>> Okay.
[26:38]
» Yeah. So, that's for signs like chevron
signs. Um if there was
[26:44]
other types of warning signs out there
that that seemed appropriate like an
[26:49]
intersection ahead sign or I don't
whatever. Okay.
[26:53]
» Um the passing line or passing signs,
those kinds of things. Um other signs
[26:57]
like the radar feedback signs like um he
was saying online there um that you know
[27:03]
show your speed and things like that.
Those signs are not necessarily
[27:07]
something that seed dot would provide.
Those would be something that we would
[27:10]
ask you guys to permit and then put up
out there. Um
[27:14]
» sorry for the radar.
>> For the radar no for the radar feedback
[27:18]
signs. So he was saying the signs that
you know they say speed limit 55 your
[27:23]
speed is whatever they have flashing
lights and then they have you know they
[27:27]
say slow down or they flash or whatever.
>> Yeah.
[27:30]
» So we
>> those would be signs the seat would not
[27:33]
provide but we would allow those if if
they made sense in a certain area.
[27:37]
» Okay.
>> Like you've probably seen the ones in
[27:40]
turn. Some intern got permission got a
permit from Ced to install that and then
[27:47]
they essentially own and maintain that
device on the highway.
[27:51]
» Okay.
>> What are those called?
[27:53]
» Radar feedback.
>> Radar feedback
[27:56]
» or speed feedback signs.
>> We have one going into town.
[28:00]
» We have several.
>> I was going to say don't I think you
[28:02]
have one on the south end, right?
>> Yeah.
[28:06]
» And Twin Lakes. Twin Lakes
>> and coming into town
[28:10]
» that way
>> where it goes from 35 to 25
[28:12]
» on 24 out by Mountain East and West
coming into that area.
[28:17]
» The one coming in from Escandido is
out,000
[28:21]
to fix it.
>> Oh, not right now.
[28:24]
» That's a good one though. That's
>> also we were told that can't flash.
[28:28]
» Yeah,
>> that's correct. Yeah.
[28:31]
» Okay. There's strict requirements in the
national regulations on signage that
[28:37]
» they have to follow
>> at least on the highway.
[28:41]
» Technically, I can't do it in the county
either.
[28:44]
» We're not going to patrol the county.
That's your on state highways. Yeah.
[28:50]
» Can I ask can I ask a question about the
um uh the speed studies?
[28:57]
» Yeah.
Um, how how do you get those to
[29:03]
um reflect accurately like how fast
people are going? Like is it like is
[29:10]
there someone out there with a a a radar
gun or is it on a tripod right there?
[29:16]
Because you know, like from a from a
driver's perspective, when you see
[29:20]
something like that set up, you're
you're going to slow down.
[29:25]
» Yeah. So, there's there's two ways that
it's done. Um, the the original way is
[29:31]
somebody would go out there with a radar
gun in a non-conspicuous looking car and
[29:36]
try to just find a place where they can
pull off on the side of the road and
[29:40]
sort of blend in and they would take the
counts. Now, what we've been doing for
[29:46]
most of our studies recently is we have
these devices that we go out there and
[29:50]
we just band them to a signpost and we
leave them for a week
[29:54]
» and we come back and get the data. So,
they blend right in. Um, you can't
[29:59]
hardly tell that they're there if you're
not looking.
[30:01]
» They're accurate. And so, that's kind of
the way we've been doing it lately.
[30:06]
» Great. Thank you.
>> How many of those can we do
[30:10]
» at a time?
many as we have.
[30:14]
» I'm just wondering to like be able to
like kind of heat map the speeds of
[30:18]
Highway 91,
not knowing where the speed is,
[30:23]
» right?
>> Is contributing
[30:26]
to the crash that might be later on.
Just wondering.
[30:30]
» So, so what we do if we're going to do
like a corridor like this is we would
[30:33]
take a look at it and go, okay, where do
characteristics of the highway change?
[30:37]
» Okay. So, as we near, for instance, a
curve that we know is rated at a lower
[30:42]
speed than the speed limit, we might put
one right there. Um, you know, so I
[30:47]
mean, there's there's there's kind of a
kind of an art to where you would place
[30:51]
them. Um, but that's one of the nice
things about not having to have people
[30:54]
out there with guns is you can put three
of them up and just come back and and
[30:59]
you have all the information. So,
>> it's like a wildlife camera.
[31:03]
» Yeah, it's kind of like that.
>> Okay.
[31:06]
How do we how do we ask for that?
[31:11]
» Well, go ahead.
>> Well, so that's that's something that
[31:14]
you would do on your own.
>> Oh, we do it.
[31:17]
» Are you talking about for speed cameras
or for just in general
[31:21]
» in general to study the speeds, not for
cameras, but just to understand
[31:26]
» just to understand what the speed of
>> Yeah. So that because it's lots of
[31:30]
contributing factors to such a
complicated roadway, right? and to such
[31:36]
varied accidents in different places.
Just how do we ask for that to compile
[31:41]
the whole picture?
>> So everything that's out there is a
[31:44]
compilation of past efforts that have
done exactly all of this.
[31:47]
» Yeah. And so
[31:51]
unless something has drastically
changed, we would have to we would want
[31:56]
to really identify why we would go take
another look at it or in what areas we
[32:00]
would take a look because of because of
some change like what is different now
[32:04]
than when we did the last speed study.
And I don't know when the last speed
[32:08]
study was done,
>> right?
[32:09]
» Um it might have been several years. Um
it's possible. Um, I will tell you from
[32:14]
experience that, um, you know, when we
when we have sign when we have speed
[32:20]
limits out there that have been out
there for years and years and we go back
[32:23]
and take a look at them, very rarely do
they ever change unless there is
[32:27]
something like I'm saying like a a big
intersection that's gone in because of a
[32:32]
development or something's being
realigned in the highway or something
[32:36]
pretty drastic usually. Otherwise, it's
unlikely that it's going to really
[32:40]
change any.
[32:45]
to to your point about doing I mean
you're talking about looking at the
[32:50]
entire corridor and where are the
speeding problems is that what you're
[32:54]
trying to identify.
>> I think that the the outcome that we're
[32:58]
seeing is really
fatal or drastic accidents
[33:04]
» and if not then like near misses almost
every time you go over. So, high
[33:10]
exposure to those fatal accidents.
So,
[33:16]
so how do we look at all of the
potential
[33:20]
causes to find the root cause that we
need to tweak to actually change that
[33:26]
outcome? And if there's a different way
to do it, great. But I'm just I'm just
[33:32]
wondering like yes, I know that a lot of
work has been done to make it the way it
[33:35]
is,
>> but we're still seeing incredibly
[33:37]
dangerous driving there.
So, so what is the next step by looking
[33:43]
at the hole and not being like, well,
you know, state patrol does this and see
[33:48]
that does that. How do we as
commissioners get enough information to
[33:51]
look at the hole so we can ask the right
person to change the thing that needs to
[33:55]
be changed? Does that
>> make sense of what I'm asking?
[33:58]
» Yeah. So, so there's
>> two components. One, we've got the
[34:03]
physical highway and two, we've got
driver behavior,
[34:06]
» right? And
I would say there's nothing out there
[34:10]
inherently
wrong or dangerous about the highway,
[34:14]
but it's how the drivers interact with
that that then can become a problem. So
[34:18]
» we've speeding is one of those driver
behaviors
[34:22]
» that the state legislature has given the
tool to do speed enforcement canvas
[34:27]
» that you can do that. And so there's a
part of if you were to map the corridor,
[34:33]
you know, where people are speeding the
most prevalent and then target that with
[34:37]
cameras. Then you got the other aspect
of where are people
[34:42]
making poor choices in their driver
behavior that are then also contributing
[34:47]
to crashes and how do you specifically
target
[34:50]
» that? Yes.
>> Yes.
[34:53]
» Okay.
>> There's there's those three things.
[34:57]
You've got the driver behavior of
speeding, driver behavior of other risky
[35:00]
maneuvers,
>> and then how does the highway interact
[35:03]
with those two things,
>> right?
[35:05]
» And so I think it's a matter of, you
know, looking at the crash data, the
[35:10]
experience of those that are seeing it,
responding it, and what could be done to
[35:15]
address that behavior.
>> And then you target the speed cameras
[35:20]
where it makes the most sense. If you
can target
[35:23]
a handful of locations, will that bring
the speed down elsewhere?
[35:27]
» Right.
>> Don't know,
[35:29]
» right?
>> Or is it that you know that the whole
[35:31]
thought about speed bumps when you play
speed bumps, people slow down to go over
[35:35]
the bump and what do they do between the
next bump?
[35:37]
» They go faster.
>> They go faster. So if they see the
[35:40]
camera, are they going to speed up
between that the next one?
[35:43]
» Right?
>> Don't know if that's the case.
[35:45]
» We haven't had enough data to know on
that yet. But
[35:49]
» those are those are the three areas that
I think you're talking about focusing
[35:52]
on. Yes.
>> Just to separate that.
[35:54]
» Thank you.
>> So this would be a thing where the
[35:58]
county
comes up with this effort to study and
[36:03]
figure out where the speeding problems
are occurring, where are those behaviors
[36:06]
occurring? And then we work together to
see what SE do on the highway and what
[36:11]
can you do on the behavior side
>> from the county's perspective. And then
[36:16]
what can state patrol do to to work on
that behavior also?
[36:20]
» Okay.
>> Does anyone know offhand like the
[36:23]
regulations around sign placement for
speed cameras? Not flock cameras, speed
[36:30]
cameras.
How how like if you could put the signs
[36:34]
3 miles, 6 miles, whatever out, that
would contribute to people slowing down
[36:41]
ahead of time and you get maybe get more
bang for your buck out of something like
[36:44]
that. Does anyone know how far out you
can put signs for that?
[36:51]
» It's a good question.
>> Yeah, I'm not 100% sure what the
[36:55]
distances are. I I know that there are
there are specified distances in where
[37:02]
the the warning signs has to be because
I think I think there has to be two of
[37:05]
them. Um I think they have to be
explicit. I think they have to you know
[37:10]
there's already a layout of what the
sign has to look like. Um I want to say
[37:15]
that the distance in front of the
cameras is more like a quarter mile.
[37:21]
it's pretty close and it depends on the
speed limit that's out there as to how
[37:25]
far you would put it,
>> right?
[37:27]
» Um, so those are all kind of part of the
applications and stuff. So I I can't
[37:32]
necessarily tell you off the top of my
head, but um I mean the the corridors I
[37:37]
I believe can be fairly long. Um, you
know, I know the one that they have on
[37:43]
93 in Denver, I think it's for several
miles. Um, even though a lot of the ones
[37:47]
that we have in the region currently are
are very short. They're usually like
[37:51]
quarter mile, but they're downtown kind
of things. So,
[37:54]
» okay.
>> Um, it'd be breaking a little bit of new
[37:58]
territory for, you know, a rural
application like this, but it's within
[38:02]
the realm.
>> We're pioneers up here.
[38:05]
» Yeah.
[38:08]
» Okay. So, regardless to in order to find
out where there are high speeds, we need
[38:14]
to do a speed study.
And
[38:18]
who we ask to do that is dependent on
whether we're going to put cameras up.
[38:23]
» Probably it's an option to go through
one of those vendors. Um there are other
[38:29]
traffic consultants out there that have
the equipments and can put up the units
[38:34]
and measure it for you.
>> Okay. what what he was talking about,
[38:37]
you know, they're they're nicknamed a
sidefire radar because it's a it's set
[38:42]
to the side of the highway, fires the
radar, and then collects the data. And
[38:48]
there's a lot of folks in the Denver
area that have those that can compile
[38:53]
the data,
collect and compile.
[38:58]
» Okay.
And then in order to create the
[39:01]
information about the
risky behavior, the drive responsible
[39:08]
driving behaviors, that's where we would
work with our sheriff to determine like
[39:15]
where these risky behaviors and
accidents are happening or how do we
[39:20]
come when you split it up into three.
There was the speed, there was the risky
[39:25]
driving behavior, and then there's how
the highway interacts with all of those
[39:28]
things,
>> right?
[39:29]
» So, how do we compile the information
for
[39:32]
» So, it's a combination of the the crash
data that SE do has access to in
[39:38]
conjunction with the other,
>> you know, incidents that aren't
[39:43]
reported, but you know, that the locals
know about.
[39:47]
You know, you talk the near misses
>> is is the category that, you know, how
[39:52]
close was it to a crash, but it was a
risky maneuver, risky behavior, and so
[39:57]
being able to compile that information
with the crash crash data to see what
[40:03]
could be done. So, it's
>> okay,
[40:06]
» COT, County Sheriff, State Patrol
getting together and saying, "These are
[40:11]
the locations that we're seeing it.
We're checking the crash data and and
[40:15]
putting that together. One of the things
to understand is there's, you know, we
[40:20]
cover the entire region
for seed dots here. We have so many
[40:25]
areas like this that unless there's
initiative on the county side.
[40:30]
» We're not going to come in and do this
unless it's, you know, rises to the
[40:34]
level within our crash data because we
have so many areas that are up there. So
[40:39]
if you're taking the initiative and
bringing seed like you have today and
[40:42]
you bring safe patrol together then more
is going to more likely
[40:48]
get done.
>> That's what I thought. Awesome.
[40:52]
Sweet. Um just a second Pete just uh had
one more question. So when it comes to
[40:58]
like near misses, should we be asking
the public to call in near misses?
[41:03]
Because otherwise how are we how would
anyone collect that data?
[41:09]
Except anecdotally from county
commissioners
[41:12]
» survey
>> survey. Yeah. Like have you seen how
[41:16]
people have compiled that data
in the past
[41:22]
» in in my work in this industry the term
near miss and focusing on it has only
[41:27]
been in the last few years.
So
[41:31]
» okay
>> survey those types of things would be a
[41:36]
new frontier I would say. I think you
mentioned pioneering for this area and
[41:40]
so it is an option to collect that
information to where are you seeing the
[41:44]
issues out there where you seeing the
near misses put that on a map we overlay
[41:50]
that with the crash data you know
there's some aspect of our people
[41:55]
exaggerating so we have to understand
what they're telling us and how reliable
[42:01]
is it and and what do we actually do
with that information is correct
[42:06]
» some of the near I guess stuff that I
talk about is when we have issues with
[42:12]
people running red lights, we will set
up cameras through a vendor will set up
[42:17]
cameras for us and collect 24 hours
worth of video and then they're putting
[42:23]
hard numbers to those near misses.
>> People run red lights, how close were
[42:27]
the cars, you know, within feet or
within milliseconds, that kind of stuff
[42:31]
to to an actual
>> near miss. this out on a rural county
[42:36]
section on a state highway with the
higher speeds,
[42:39]
» you know, we would not be able to put
those cameras up
[42:43]
» to make any meaningful data out of that
kind of a near study.
[42:48]
» Okay.
But maybe we could like if we had enough
[42:52]
information from our community about
where they're experiencing new new
[42:55]
misses and we put a camera up
>> and we do find something,
[43:00]
wouldn't that be
>> could there be meaningful data from
[43:04]
that?
>> Yes. I'm just saying that over a
[43:06]
corridor of however many miles
>> trying to target the right spot,
[43:10]
» right,
>> to to video near misses
[43:13]
» to actually catch one. where that's why
he says we usually use do that kind of
[43:17]
stuff in intersection because I mean
constantly all day there's near conflict
[43:21]
so
>> that's kind of the
[43:24]
» the main
>> the main use
[43:26]
we did a high use crosswalk adjacent to
a ski area
[43:32]
» uh for like 36 hours had over 300
potential near misses with pedestrians
[43:39]
and when we say near miss that means it
wasn't like they were about to get hit
[43:43]
but they were within the parameters
[43:48]
or they didn't
like you
[43:54]
on a county road, you know, like
>> Mhm.
[43:56]
» say highway in the county is it may not
be beneficial and these are pretty
[44:01]
pricey stuff. These are the typical
intersection for 24 hours is about 10
[44:04]
grand.
>> Okay.
[44:06]
» Wow,
>> cool. So going the route of asking you
[44:11]
doing some sort of a survey to target
those areas where people seeing it and
[44:16]
then that gives us a location or
locations a few locations to then focus
[44:21]
our efforts and look at that might be
much better.
[44:25]
» We can do that. I'm thinking a big map
with pins
[44:32]
» sticky notes.
>> Yeah. And anybody who comes into the
[44:34]
courthouse can put a pin where they've
had near messes.
[44:38]
» Just spitball it.
>> That's cool.
[44:40]
» Pioneering.
>> Can Can you set up an online map?
[44:44]
» Could we do that
>> that people can go to a website, drop a
[44:49]
pin,
>> and the explanation of
[44:54]
what what they saw, what they
experienced.
[44:57]
» I love this.
>> Let's go. Let's make the highway safer.
[45:03]
Okay. I hear there's multi-steps. I hear
that it's multi- like
[45:08]
» there is
>> agencies. So, so I I think a a good next
[45:12]
step for us is um you know, like I said,
I apologize we can't pull up the data we
[45:18]
sent you, but um we will take a look at
the data that we have in this area and I
[45:25]
think we can do kind of a highle study
like we do in other areas and and
[45:31]
identify hotspots, potential mitigations
kind of from our perspective. And if
[45:37]
there's some information that you guys
can gain, whether it's from the near
[45:41]
miss near miss stuff or or speed
information or whatever, you know, I
[45:46]
think we can come together after that
and kind of maybe see where we land and
[45:50]
maybe start to prioritize or look
deeper.
[45:53]
» That'd be great.
>> I also hear loud and clear that if you
[45:56]
change if you potentially change a
behavior in one area, you might be
[46:00]
pushing
behavior to a different area and making
[46:04]
it more risky. Totally hear that. So,
I'm just want to say I'm not being
[46:08]
overly enthusiastic about changing the
highway. I'm being overly enthusiastic
[46:13]
about collecting information
to be preventative and not make things
[46:18]
worse.
>> Yeah.
[46:20]
» Okay.
>> So, I mean along those lines, just
[46:24]
you talked about guardrail on an S
curve. Well, could we target the
[46:30]
behavior such that that guardrail is not
needed,
[46:33]
» right? the chevrons versus the
guardrail. Right.
[46:37]
» Right.
>> Yeah.
[46:38]
» Yes. And so,
you know, when I look at the crash data
[46:43]
and it's like, if we could eliminate no
drinking and driving, people wearing
[46:47]
seat belts, how many fatal crashes would
go down,
[46:51]
» right?
>> And that's not a highway thing. That's a
[46:54]
behavior thing.
>> Totally.
[46:56]
» There's so many behaviors that could be
targeted that will have way more impact
[47:02]
than what we do on visible.
>> Yeah,
[47:06]
» I think Highway 91 would need like an
alarm clock program then because
[47:12]
» everyone's in a hurry to get to where
they left 10 minutes too late to go.
[47:17]
» I was thinking the same thing, Andy.
>> You got to swing by the liquor store,
[47:23]
the weed store before you jump on that
highway.
[47:30]
» I didn't follow it, Matt. I'm sorry. I
know. I just didn't follow.
[47:35]
» Would it be helpful if we shared with
the two of you the um the data from
[47:39]
Chief Daily?
>> Absolutely.
[47:40]
» About the incident.
>> Sure. Absolutely.
[47:42]
» Maybe some other emails.
[47:48]
» Absolutely.
Well, from y'all's perspective, what
[47:52]
questions should we be asking or like
where do you think that we could be
[47:57]
targeting more of our efforts to change
driver behavior
[48:04]
as opposed to just working with C dot
and state troopers?
[48:11]
» That's a tough question. That's
something that we don't do a whole lot.
[48:15]
No, I'm just saying from your from your
experience and your p your position.
[48:19]
» I I think any kind of of seasonal
campaigns are very helpful. Um, you
[48:25]
know, we see that in some of the the
other areas where um,
[48:31]
you know, they're just trying to get
messages out there on when snow, you
[48:36]
know, early when early in the winter
time when seasons change. um you see
[48:40]
things out there um when you know
there's going to be trick-or-treaters or
[48:44]
events or things like that. Any kind of
local campaigns on what your safety
[48:50]
folks are seeing or are expecting to
see. I think that's helpful. I know
[48:55]
that's those are not always easy things
to do, but sometimes there's little
[48:58]
things that can be done, but I think
promoting any of that kind of stuff at a
[49:02]
local level is helpful.
>> Great.
[49:05]
» Um you mentioned travel time. Yeah.
>> Where are most people coming from,
[49:11]
commuting from, and then sitting down
and calculating, you know, what's the
[49:16]
difference in 10 miles hour of a speed
limit versus going the speed limit?
[49:21]
» And then, you know, is that extra is
that saved 5 minutes worth the risk
[49:27]
» of a lifetime of, you know, someone
dying or,
[49:32]
you know, injuries that you're dealing
with over a over a lifetime.
[49:36]
» Yeah, that's a great idea.
do the math for them.
[49:40]
» Yeah. And you know there's campaigns out
there, but if you target it specific to
[49:44]
the drivers that you know are on 91, as
you've mentioned, the commuters that
[49:48]
left 10 minutes late, well, is trying to
make up that 10 minutes worth the risk
[49:55]
of what could occur?
>> Yeah.
[49:57]
» And putting those messages out. I mean,
you know, C do DOT works with state
[50:02]
patrol and we target the whole state,
but if you can target specific to the
[50:07]
folks to and from this area, it'll be
more meaningful.
[50:15]
» Pete D, you did you want to say
something?
[50:17]
» I I did. Um, this is Pete. He's an
exparte member of board
[50:24]
» from the community, representing the
community. Um,
[50:29]
one thing that hasn't been discussed is
is active enforcement and maybe there's
[50:33]
a reason for that. Um, you know, what
about tickets issued? Um, you know, by
[50:40]
by officers on the on the road, you
know, where they were issued, what the
[50:45]
speed limit was uh exceeded by, um,
tickets that were issued for passing in
[50:50]
a no passing zone. It seems like you
know that's information that if there is
[50:57]
enforcement
um should be should be available and
[51:00]
should should be you know part of the
part of the data set and I don't I don't
[51:06]
know what you know there must be
statistics on how many tickets have been
[51:09]
issued you know on highway 91 in Lake
County for the you know per year and and
[51:16]
then the the backup for that. You all
get that from the state troopers or just
[51:21]
crashes?
>> We don't get that information though.
[51:24]
» You don't get the tickets.
>> State patrol would have that information
[51:27]
though. I'm sure your sheriff has a
contact there. I think they would
[51:31]
provide that.
>> Yeah, we need to get lots of data from
[51:34]
Heath.
>> He couldn't make it today. He really
[51:36]
wanted to, but
>> we don't see much state patrol activity
[51:40]
really.
>> And you know, Keith could be out there a
[51:44]
little more too in my opinion. That
would that would help solve a lot if
[51:49]
like a cameras stationary camera is one
thing once the word gets out like
[51:53]
» look I got a ticket looks like I'm on
marker four then the word gets out
[51:57]
whereas a sheriff's deputy could be
anywhere
[52:01]
and the word would get out too like hey
I got a DUI on the way from work so
[52:07]
that's a good point Pete one other
comment um you know there was discussion
[52:13]
about how you know the where the passing
and no passing lanes, you know, where
[52:18]
they are have changed over over time.
You know, it' be good to I'm sure there
[52:22]
was good reason for changing it whenever
it was changed last time, you know, but
[52:26]
maybe that could be re re-evaluated
because I think one of the issues other
[52:30]
than speeding are people trying to pass
slow trucks, multiple slow trucks at a
[52:35]
time. If there were if there were more
no more more passing lanes, legal
[52:40]
passing lanes, then those might be, you
know, used preferentially to the to the
[52:46]
illegal passing lanes. So So it seems
like that data ought to be available.
[52:51]
You know, what's been changed over the
years in terms of where the passing and
[52:54]
the passing zones are.
>> Yeah.
[53:02]
Okay.
Thanks Pet.
[53:09]
» Should we move on to Highway 24?
>> We should discuss it.
[53:15]
» Yeah, absolutely. There's a couple
issues on Highway 24 and um for our CEO
[53:19]
friends, it would be helpful to have you
here, but understand if your schedule
[53:22]
requires you to step out.
>> Oh, we can stick around for a while
[53:25]
longer.
>> Great. Great. Um so the next issue um to
[53:30]
discuss from 91 to 24 uh is related to
some um some citizen concerns raised I
[53:36]
think to a couple commissioners as well
as through public works u related to
[53:39]
access into the home state trout club.
Uh so we just wanted to give a little
[53:43]
bit of background. I think this issue
has has come up several times over the
[53:47]
years. Michael has some background on
it. Um just related to you know what is
[53:51]
the county road? what is possible at
that particular intersection given the
[53:55]
the narrow entrance um which is
challenging for emergency vehicles as
[54:00]
well as larger truck deliveries and
things but the limitations that exist
[54:04]
related to the cattle guard etc. So, I
hope you don't mind. I'll hand that one
[54:08]
to you.
>> Pull it up on mapure.
[54:18]
» Let's over here.
[54:29]
This friend is a cow guard right there.
>> So, this doesn't actually show where the
[54:33]
C dot rideway do rightway. outside of
that. Um, that whole Gard is actually
[54:40]
according to our property map is inside
the way. So, that was a gate to a ranch
[54:48]
at one time.
Um, I'm not sure when the county took
[54:53]
over county by 21, but it only goes
through the ranch to private property.
[54:59]
Now, the private
property owner owns both sides of that
[55:03]
on to the highway. Um
[55:09]
it is narrow across the cattle guard. Um
there is coming down from the north side
[55:19]
which is 24. That's actually the west
side.
[55:24]
Um off the Tennessee Pass there's a
corner just before it gets to this
[55:28]
intersection
right up there. You can leave the
[55:33]
highway.
>> Okay.
[55:36]
Sorry.
Catch up.
[55:40]
Okay. Oops. You done?
>> That was really cool.
[55:46]
Elastic.
>> Oh my goodness. Where is the curve?
[55:55]
» You talking about this curve?
>> Yeah. That looks really gradual on the
[55:59]
map, but in in reality, that feels a lot
sharper and blinder of a curve than it
[56:04]
looks like right there.
>> Michael, which curve you talking about?
[56:09]
» Um, yeah, it's coming down from that
way, but it's closer to the
[56:14]
» this one. This big curve.
>> Yeah, right there.
[56:17]
» Okay.
>> It's really It doesn't look like it. You
[56:19]
don't have sight until you get around
that corner.
[56:23]
Um, which kind of the problem with
traffic, you know, visibility.
[56:29]
In my opinion, we need to This is
actually a pretty big project to just
[56:32]
change out a co change out of Calgary.
[56:37]
Um, for the county, we'd probably have
to get an online GPR because it's going
[56:40]
to be really expensive
to probably put in a del lane and an XL
[56:47]
lane out of that driveway or county road
onto Highway 24.
[56:53]
Um, I know there's problems with traffic
turning into county, road 21 coming from
[56:58]
the south or the east. um because you
stop in the lane, you have to wait for
[57:03]
traffic to go by before you can turn.
Um you know, those are just some of the
[57:08]
things that I've looked at out there
that were to change this, it would take
[57:13]
a pretty big C do project to do that
C do involved project even if it's going
[57:19]
to the permits and everything.
>> Is is there a way like I know ideally we
[57:27]
could have the excel del lanes Um, and
you know, do this in a way that every it
[57:34]
checks all the boxes, but like a lot of
things in local government, um, we were
[57:39]
just touching on this this morning.
Sometimes seeking perfection means
[57:43]
nothing ever gets done. And I know one
of the big issues these folks out here
[57:48]
have is that if there's a fire, if
there's a medical emergency, if there's
[57:53]
a a big truck delivery, they just can't
get in there easily. It's such a narrow
[57:58]
entrance. So, uh, in the meantime, while
we're waiting for, you know, how to
[58:03]
figure out how to do these bigger
projects, why why exactly can't we just
[58:08]
widen the entrance?
[58:14]
» Well, the thing is is it's not a
permitted CO entrance as it is. Um,
[58:20]
» I because I've checked this without just
right away people. Um, it was never
[58:26]
permitted. It wasn't a county run when
it was first put in. It was a driveway
[58:30]
to a ranch. Um the county took it over
to make sure I believe to get people to
[58:35]
the M state club cuz it ends at their
first property line. Um,
[58:44]
» so you know, I don't know that's why it
would all have access would have to be
[58:48]
permitted, which you know, kicks in a
whole bunch of C dot stuff right
[58:53]
» away from it.
>> Yeah. My name is Sean Sprag. I'm with
[58:57]
the Home State job board. I'm the vice
president of the board out there. Uh,
[59:02]
this has been a ongoing problem for six
years now. We approached the county. uh
[59:08]
when I was building my house out there
during COVID uh and we approached the
[59:14]
county because I we had to get
inspections to make sure that a fire
[59:18]
truck could get to my house in order to
get permits. Um we have recently put
[59:24]
almost a million dollars into the trial
club and fire mitigation. We're trying
[59:27]
to become the first uh association in
Lake County to be firewise. So we've got
[59:34]
grants from the state. We've also done a
ton of work ourselves. Um, and we've met
[59:40]
with Dan's team here to improve the
roads, the bridges. Um, all the coverts
[59:47]
have been extended to over 20 ft wide.
Um, and we're trying to meet the class
[59:52]
one classification for a fire truck to
go in there. And this simply doesn't.
[59:57]
That's 13 ft wide. the dip in the
middle, which is extremely dangerous, um
[1:00:03]
is over the uh restrictions for a class
one truck to go over that. It dips
[1:00:08]
almost almost a foot, foot and a half.
Um and so in order for us to really
[1:00:15]
achieve that, you know, you guys have
dealt with this fire situation. We've
[1:00:20]
this is not just reactive to willow
fire. This is something that's been
[1:00:24]
ongoing for the last 3 to four years.
This fire mitigation that we're trying
[1:00:28]
to achieve, we have homeowners that
can't uh even get insurance out there.
[1:00:33]
So, um, we were proposing just a simple
gate widening, which, uh, I've reached
[1:00:40]
out, we've reached out as a team, I
guess I should say, uh, other board
[1:00:44]
members have reached out to the state to
get clarification on the issue that he's
[1:00:49]
speaking to, um, about what would need
if we just did a simple gate
[1:00:54]
replacement. Um, so the simple gate
replacement was not going to trigger any
[1:01:00]
of the warnings. I have emails from that
and that was over 5 years ago that we
[1:01:03]
had that.
>> We also had uh what I would call bad
[1:01:07]
faith from the county of told not to
speak about this issue which we are very
[1:01:13]
aware of. Um
and and so we had to reach out for
[1:01:18]
council on this. So we reached out
council. All we're simply looking for
[1:01:22]
from home stakes perspective maybe when
the you know we our understanding is
[1:01:28]
that that we are an existing uh
homeowners association and unless we you
[1:01:35]
were putting in a new homeowners
association you would need those turn
[1:01:39]
lanes and that kind of upgrade but
because we're not we're an existing
[1:01:44]
homeowners association and I have emails
to show that I've got clarification on
[1:01:48]
this that all we simply we need to do is
widen the gate. 20 ft wide is what we're
[1:01:53]
looking for. A newer gate. They put a
newer gate across the highway that
[1:01:58]
doesn't serve anybody. Uh new cattle
grade that doesn't serve anyone that
[1:02:02]
goes to horse horse stable. So that was
kind of questioning that happened after
[1:02:07]
we asked for this to get done. Um but
yeah, if we had that map of close call
[1:02:14]
incidents, it would be a daily mark on
this. It's a very dangerous turnout. In
[1:02:20]
fact, uh there's a depth just right up
the street that there was people speed
[1:02:25]
on that section 55. Guarantee you it's
70 as an average through there. So,
[1:02:31]
we're just simply asking that the county
do in good work in good faith with this
[1:02:36]
since it's been a six-year process uh
that we get the gate widened
[1:02:41]
immediately. We we've asked for it for
six years. It's been put off. It's we've
[1:02:45]
been slow played pretty big and it's
we're not lot lot of lot of smart people
[1:02:51]
working here. I I run a metro district.
I know how the process works. We're
[1:02:55]
hoping we can at least get this on the
budget for this year coming into the
[1:02:59]
summer. It probably wasn't budgeted for
it anytime or going forward. I'm sure
[1:03:04]
it's not budgeted now. So, we're just
looking to see if we can get on a
[1:03:08]
budget, at least get the gate replaced.
And then as the people in Trout Club are
[1:03:15]
becoming yearly,
just a quick background, to buy a house,
[1:03:19]
she she's a real estate agent, she knows
to buy a house, you have to pay cash.
[1:03:24]
So, to simply buy six, you know, there's
little Kevin in there, too. But simply
[1:03:30]
by $500,000 c cash uh offer for a house
there. You know, you can tell what kind
[1:03:36]
of clientele we're starting to get out
there. We do have a lot of people that
[1:03:39]
have got their cabins hand-me-down, but
that's now changing. We got year round
[1:03:44]
access. Got people that come up during
the ski season. Um so yeah, I mean we
[1:03:51]
really really I think the gate could go
away. We'd be happy with that. There's
[1:03:56]
no we don't have horses or cattle. I
know Colorado is a uh fence. What is it?
[1:04:01]
A fence out state, which is odd, but um
>> Sean, can I ask you? I don't see a gate.
[1:04:07]
» No gate.
>> Well, you keep saying gate. No, you
[1:04:10]
gate.
>> Great. I should say guard. Yeah.
[1:04:13]
» So, there's no real reason to have the
cattle guard there.
[1:04:15]
» No, we So, you can see there's a fence
to the south, which is the left of that
[1:04:19]
picture. if there were ever going to be
any kind of horses or anything, that
[1:04:25]
property, the property to the north,
which is to the right, has never been
[1:04:29]
used uh for for grazing or any purposes
like that. So, truly, I think that the
[1:04:35]
the point where the you know, you don't
really need one there and our our
[1:04:40]
homeowners really don't want one. So,
it's really difficult to pull in because
[1:04:45]
you kind of have to pull in at you're
almost scared to pull in at a slow
[1:04:49]
speed. So, you kind of have to pull in
and then there's no apron there. It's
[1:04:53]
all uh gravel. You can see the damage in
the lower left there. Um from the gravel
[1:05:00]
meets the Yeah. If you bring your mouse
to the left a little more. Sorry.
[1:05:05]
» Yeah. Right there. Yeah. Yeah. That's
created because there's no apron. Um so
[1:05:10]
maintenance is probably an issue with
that for the highway department um at
[1:05:15]
some point. It doesn't bother anybody
right now. But um but yeah, I mean I I
[1:05:21]
just think right now we'd love to see
the gate disappear or or at least get to
[1:05:27]
where we can safely get a truck in and
out and during any kind of emergency
[1:05:32]
have better access. That's our concerns.
>> So couple questions for
[1:05:38]
» those involved here. So heard earlier
this is a county road.
[1:05:43]
» Yeah, it's county road 21.
Yeah.
[1:05:46]
» Okay. So, county has jurisdiction over
the access, but we've got private
[1:05:51]
homeowners farther back as an
association. When when was that
[1:05:56]
group? When was the development put in?
>> 1934.
[1:06:01]
So, long time ago. Long time.
>> Okay.
[1:06:06]
So there's some issues on grandfathering
accesses in I mean 1979 was the year
[1:06:13]
that the highway access law was put into
place. Anything at that point is
[1:06:18]
grandfathered in. But then there's also
a provision that is as traffic increases
[1:06:23]
over time then the provisions of the
code will kick in.
[1:06:28]
But as a as a county road, you could
apply for a C dot highway access permit
[1:06:34]
and go in there and do the widening that
you needed to. And part of that permit
[1:06:38]
would say
depending on what the traffic volume
[1:06:43]
show, but it may show that left turn
del, right turn del, you know, all of
[1:06:48]
those auxiliary lanes would be up for
for looking at whether they're required
[1:06:53]
or not for per for the law. But at a
minimum, you could come in first step,
[1:06:59]
just widen the access, do what you need
to do, and then budget for the larger
[1:07:03]
project to come in and do the turn lanes
at another point. We would seed dot
[1:07:10]
would prefer that this is not on CO
rightway and that cattle guard should be
[1:07:15]
moved if it stays or if it's taken out.
>> Removed. Yeah.
[1:07:19]
» Yeah. But if it something needs to say
that would be part of the permit is you
[1:07:24]
move it off of the seed dot rideway so
that it's farther back.
[1:07:29]
» So one of the things with with access
permitting is
[1:07:33]
let's just say that by the book this
location warrants a couple turn lanes.
[1:07:39]
Okay.
>> Mhm.
[1:07:40]
» Doesn't have them. So
you don't necessarily have to go to that
[1:07:46]
extent to do anything if you're just
doing a betterment.
[1:07:50]
It doesn't necessarily have to meet
every standard by the book that we would
[1:07:54]
like to see there because it's still
better than what you got.
[1:07:58]
» So we do have the ability to permit
betterments like what you're talking
[1:08:02]
about um pretty simply.
>> Right.
[1:08:07]
One clarifying point on that, that works
for a public road. If it's a private
[1:08:14]
access, that's not the case.
>> The just to reiterate this, I'll say it
[1:08:20]
twice. For a public road, you have the
option to do things in increments as a
[1:08:25]
better.
[1:08:30]
And just to be clear, why don't we can
just take the cattle guard out,
[1:08:36]
» right? There's no
>> Yeah, I guess they're saying I can take
[1:08:39]
it out.
[1:08:43]
» I mean, I think I think our board has
really felt like this issue has been
[1:08:47]
kind of put aside by the county for
quite some time. Um, we brought it up to
[1:08:54]
previous commissioners. Um, and I coach
volleyball. I've been here for a long
[1:09:00]
time, 30 31 years now. Um, and I've
actually had some conversations with
[1:09:07]
those previous commissioners um, about
this. So, we I have some insight as to
[1:09:13]
how this kind of went down and was
ignored purposely. It was just kind of
[1:09:17]
painful and hurtful that, you know, I
know my wife pulls out of there every
[1:09:21]
day. So, you know, I I think um just
moving forward would be nice that it's
[1:09:27]
acknowledged. This meeting's amazing. Um
that it's acknowledged and it's on the
[1:09:32]
radar and it's something that we look to
improve. Um yeah, I I really I mean our
[1:09:39]
board would love to just see it
disappear. It would be uh I think
[1:09:44]
honestly cost just to pull it out, put
in gravel um is a very low cost to get
[1:09:52]
something done like that. So
>> how many
[1:09:54]
» I would agree.
>> How many homes are up there?
[1:09:57]
» 70. We have 72 cabins
>> and some are seasonal or
[1:10:01]
» um yeah, there it's starting to increase
getting a lot more year round. In fact,
[1:10:06]
I I would say seasonal, but they're
using it both winter and summer now. uh
[1:10:10]
because we used to not plow all the
roads back there, but now we plow
[1:10:14]
everything uh with the road improvements
that we've made. So, um there's probably
[1:10:19]
only 20 residents, give or take, uh now
that are permanent year round. Um but I
[1:10:26]
I would say the majority of them are are
using it in the winter now just for the
[1:10:31]
ski cabin effect kind of thing.
>> Well, Sean, we'd really like to do the
[1:10:37]
work at this point. Yeah,
>> that would be great.
[1:10:40]
» It seems like a really reasonable
request. So, we'll we'll
[1:10:45]
try and make it happen. Maybe next next
year. I know this year is tight with the
[1:10:50]
fire.
>> I lost the summer time already.
[1:10:52]
» Yeah, I'm sure.
>> I I understand. I run a metro district.
[1:10:56]
I understand how all works. You got a
budget for it, so I'm not expecting this
[1:10:59]
to happen in this budget year. I don't
know how your guys's budgets are set up,
[1:11:04]
but uh but I would hope that we would
look to maybe get that on future plans
[1:11:09]
for sure.
>> We do try and avoid oneoff expenses, but
[1:11:12]
» just to make a point, we have done a lot
of work on this. Okay.
[1:11:16]
» Yeah. A lot. We have changed all the
culvers out on it.
[1:11:18]
» Yeah. um at the main crossing there.
This one was unproposed for one of our
[1:11:24]
new bridges,
>> but we only had a chance for five and so
[1:11:28]
this one was the last one to drop, but
that's why we changed to put only covers
[1:11:32]
in there.
>> Yeah.
[1:11:33]
» So, that was one of the first ones we
did in that that
[1:11:36]
» system of the river flowing down the
valley.
[1:11:39]
» Make sure it would all flow pretty good.
>> Um the beavers like it up there.
[1:11:46]
» Yeah. Um there's a couple beaver dams on
um Tennessee Creek that are getting
[1:11:53]
really close to the highway right away
or the highway surface.
[1:11:59]
» Can I ask a clarifying question just
longer term about future of the road
[1:12:02]
itself? Is there so if I'm understanding
correctly it only provides access to
[1:12:09]
home state. Is there any benefit to
homestake or benefit to the county that
[1:12:13]
this would this road itself would be
conveyed to homestake?
[1:12:18]
» I think that was mentioned for sure. Uh
we've had several discussions about it.
[1:12:22]
Um I think especially after they've done
the um the improvements to the to the
[1:12:30]
river there access. Um yeah, I mean it
it has to get permission from you guys
[1:12:38]
to go that direction, but uh and we
would have the means. No problem. We
[1:12:42]
have the heavy equipment and we have we
have a really amazing caretaker who
[1:12:46]
would love to pull that gate out. So um
but yeah, that I think that comes down
[1:12:52]
to you guys giving us access or
permission to be a full private road. So
[1:12:58]
» Michael, on your side of things, like
what is that like? It's about a mile of
[1:13:03]
road that we maintain. So, we want to
maintain it. Lastly, we do go all the
[1:13:07]
way to the clubhouse because we have to
turn around and get out where the
[1:13:10]
properties start where the property
start before the county road actually
[1:13:15]
ends. Um, there's no place to turn
around there.
[1:13:19]
» Yeah.
>> Well, that sounds like a solution
[1:13:22]
or possible solution. Is there any
drawbacks that we lose any funding or
[1:13:26]
does it cost more to maintain than
>> Well, the the betterment permit will
[1:13:30]
only work for a public road, which I
think is something we might lean on to
[1:13:34]
get the widening done,
>> right?
[1:13:39]
» Yeah.
>> Yeah.
[1:13:40]
» Good catch, Andy.
>> I mean, it could be problematic for any
[1:13:43]
future development is is the only thing
out there,
[1:13:46]
» right? I mean, you could convey it in
such a manner that I think you could
[1:13:51]
preserve that with, you know, preserving
easements and so forth for the county,
[1:13:55]
but but that's the one thing you'd want
to think about is the future.
[1:14:00]
» Is it something that the county could
maintain ownership and delegate
[1:14:06]
maintenance?
>> We could probably use
[1:14:12]
Well, Sean, we're going to follow up
with this and we really I'd really like
[1:14:15]
to see it. It seems like simple. It
seems overly complicated and simple at
[1:14:20]
the same time.
>> Thank you.
[1:14:22]
» So, uh, sorry it took so long.
>> Yeah.
[1:14:27]
» Jeez, we'll keep following up. I know
this has been on Andy's radar for a long
[1:14:31]
time. So
>> yeah,
[1:14:35]
» I think that my impression Andy's
brought it up a few times to us and my
[1:14:39]
impression has been trying to figure out
who is responsible for what has been the
[1:14:42]
biggest lift for us as new BOCC and all
of our new staff. So now that we're
[1:14:48]
here, happy to move on it.
>> Yeah,
[1:14:52]
» it's clear now. Sometimes it's hard to
understand what the past and all that
[1:14:56]
stuff, but
>> it's great to now have some clarity and
[1:15:00]
know that it's got to be on the list.
>> I'm also really sorry for how you've
[1:15:05]
been treated that you've been working on
this for so long and have felt so
[1:15:08]
discouraged. It's not how you I'm really
sorry about that.
[1:15:12]
» It's It's okay. It was just kind of a a
stick in the eye when you're out there
[1:15:15]
doing fire mitigation and the guy from
the fire department's telling you that
[1:15:19]
your roads must be
to for us to bring a fire truck to your
[1:15:25]
house, which is what you want. And you
see a fire out your window, which we got
[1:15:30]
great views this year. And then you know
that he's telling you 20 foot wide and
[1:15:36]
you know that the very entrance of your
community is not that. So yes, it was uh
[1:15:42]
it was why I asked to be on the board.
Um uh Homestake, I'm usually pretty busy
[1:15:48]
guy other than than that. I run a metro
district and I coach for so long. So uh
[1:15:54]
I actually asked on it because my wife's
had several really close calls out
[1:15:59]
there. If you're trying to stop and
someone doesn't want to stop behind you
[1:16:03]
to turn left to go in there, they go
around you and that's really dangerous.
[1:16:08]
Yeah. So we just just just just the
close calls recently. I just said I we
[1:16:13]
have to move forward on this and we got
to draw some attention. So that's why
[1:16:17]
I'm here.
>> Thank you.
[1:16:18]
» Yeah.
>> Thank you Sean.
[1:16:23]
You're welcome.
>> We'll follow up.
[1:16:26]
» So just to reiterate on the seed
process, you would um apply for highway
[1:16:31]
access permit.
>> Okay.
[1:16:32]
» To do any work in the highway rightway.
So even widening on the side of the
[1:16:39]
highway would require that cuz it's in
the rightway.
[1:16:42]
» In order to do the betterment, it would
have to stay a public road.
[1:16:46]
» Correct. Otherwise, you know, the study
would potentially require a massive
[1:16:50]
improvement.
>> And it might be worth doing a study just
[1:16:54]
to see what what's there. Anyway, I
don't know. You know,
[1:16:57]
» we could we do the betterment and have
an agreement like you said where the
[1:17:02]
homeowners association is maintaining
the road with the county owns it. What
[1:17:06]
happens beyond the C not right away is
between you and the home association.
[1:17:11]
» Okay.
>> But this is definitely in the C not
[1:17:14]
right away.
>> Well, I that's what I'm hearing. I I was
[1:17:19]
trying to pull it up on my phone, but
now I've lost connection on my phone,
[1:17:21]
too. So,
>> no. What is happening?
[1:17:27]
» There there's publicly accessible. You
can see the what what C do show us for
[1:17:32]
rideway bathrooms also in addition to
your county AG. So that's right
[1:17:37]
» and that is the same permit process if
we're just going to do the Betterment
[1:17:40]
who would do the access permit.
>> Correct. It's all work at the access and
[1:17:47]
it would all fall into that process.
[1:17:53]
» Private Go ahead.
>> Just something generally to be aware of
[1:17:56]
for everyone in this room. We have
applied for um the safe streets and
[1:17:59]
roads for all grant to take a look at
county all county roads. Um this was
[1:18:03]
sort of precipitated by what's going on
out on county road 4 um at the lake but
[1:18:08]
um this would certainly fall into the
scope of that of that project and I
[1:18:12]
don't know if that you know assists or
advances the study you all would need to
[1:18:17]
um allow for an additional project in
that area or if there's something
[1:18:20]
specific they have to do.
>> Yeah. So this is a plan for all of the
[1:18:24]
county that they have to look at, not
just January 4th.
[1:18:29]
» This is one of them. So
>> I mean things are moving. It's just
[1:18:33]
slow.
>> On that road study once we have it done
[1:18:39]
opens us up to apply for additional
grant funding. No.
[1:18:43]
» Okay.
[1:18:50]
» Okay. Any other issues, Josh, that we
need to talk about on 24?
[1:18:54]
» I think um so if we're done talking
about home state, we do have another uh
[1:18:58]
topic for for Highway 24 South.
>> Okay.
[1:19:01]
» Um the C CPD and public works are
currently considering a driveway permit.
[1:19:07]
Um at uh yeah, 20 2100 Highway 24 South.
Um this is driveway access that drops
[1:19:14]
directly down onto Highway 24. So again,
we accessed off the state highway. Um,
[1:19:20]
and Ann has some background to share on
this. I believe we also have Tom Marson
[1:19:26]
Engineering should be joining us who has
some background on the design of this
[1:19:30]
particular site.
>> There's a folder in teams that says
[1:19:33]
driveway.
Do we want to look at the spot?
[1:19:37]
» Thank you. I I
>> No worries.
[1:19:42]
» Um, yeah. So, if you can get to the
location, I have sent an email to
[1:19:49]
You should be joining us soon here.
>> Go a bit further.
[1:19:53]
» Oops. Excuse me.
>> It's almost to the toxic entrance or
[1:19:59]
» Yeah. Yeah.
>> Wait a second. Let me just orient
[1:20:03]
myself. I do know where it is. Give me a
second.
[1:20:07]
» It's like up
>> here. A little more south.
[1:20:12]
» Game changer.
>> Game changer.
[1:20:15]
There you go. Here
it is.
[1:20:20]
And then
>> right down there. Right where the one
[1:20:24]
Yes.
>> Yep.
[1:20:26]
» Do we want to look at it here? Should I
pull up stuff on Teams and Andy will
[1:20:30]
share with you?
>> Okay. Thank
[1:20:32]
» the engineer design for the driveway.
>> So, um I've sent a quick email. Tom's
[1:20:37]
been multitasking, I think. Um Ed will
be joining us in a moment. Hopefully. I
[1:20:42]
don't quite see him in attendance yet.
Um, so just a little background on this.
[1:20:48]
Um, this is the county's access um here
um that we allowed the property owner to
[1:20:56]
utilize to um for access for their
driveway. Um this parcel is one of our
[1:21:03]
um favorite probate plat out in um E
Hill. And so um our first thought is,
[1:21:11]
wow, this is quite the site to develop.
Um but it did have a platted um ability
[1:21:17]
to access it at this point. They
approached Michael about being able to
[1:21:21]
use our CO access point and um so they
did coordinate with C dot on um the
[1:21:28]
access and then this driveway design is
something obviously that's been very
[1:21:32]
challenging. So when they came in for
building permit um and applied for the
[1:21:37]
driveway, I did place a stop work order
on this um driveway until we could get
[1:21:43]
an engineer design on it. Um so they
worked with um one design and recently
[1:21:51]
um they disengaged with their previous
engineer who actually had retired and
[1:21:56]
have contracted with Marson Engineering
and this is a redesign of the driveway
[1:22:02]
access. This gets a lot of um public
scrutiny um and concerns from our
[1:22:07]
previous board as well as current board
about the safety. So, we've worked
[1:22:13]
really closely with Brian Kian from C
DOT and Candace from C DOT. We've done
[1:22:17]
site visits um at the site to look at
the engineer design. This was the
[1:22:22]
previous design. Michael goes by this
obviously every day and is really our um
[1:22:27]
eyes in real time to make sure that we
have stability of that that slope and
[1:22:32]
and safety um to kind of alleviate
safety concerns. We do take a lot of um
[1:22:39]
concerned comments from the adjacent
property owner Paul Irwin in this area.
[1:22:44]
And um so this does get elevated to
Michael and I often. And um so just
[1:22:50]
wanted to include this today to give you
kind of a situational update of where we
[1:22:54]
are in the process. The building permit
has not been extended yet until we can u
[1:23:00]
make sure that this new um engineered
design is approvable. Um, the driveway
[1:23:06]
uh permit needs to be updated with the
design. So, Michael today, I think we'll
[1:23:11]
have to kind of take that opportunity to
hear from um Tom Marson on the new
[1:23:15]
design.
Hopefully, there he is. Tom is with us
[1:23:19]
and you can kind of um before we
introduce Tom, is there any questions
[1:23:25]
that you have in regards to kind of the
history and what led us to where we are
[1:23:28]
today?
>> I do have a little bit more history to
[1:23:30]
add to that.
Access is actually
[1:23:35]
um approved and permitted by C do prior
to these people owning this property was
[1:23:42]
for an adjacent property that had to use
the same access would be a public road,
[1:23:47]
not technically a county road because
it's in that subdivision,
[1:23:52]
but that's why the county had to approve
them accessing CO because it is a public
[1:23:57]
road
and that was permitted in that
[1:24:03]
the early 2000s 2005 someone there um
and I believe it was I think they've
[1:24:10]
been trying to sell their property
because they realize that they cannot
[1:24:14]
access their property.
>> Yeah. Be able to again you have the
[1:24:19]
appropriate plots which consider access
without taking into account really doing
[1:24:24]
the engineering work and topography that
it would need to make these feasible.
[1:24:28]
So, it was the John White property that
originally petitioned the county for the
[1:24:32]
ability to to use the access to put in
the road, but that road design has never
[1:24:38]
come to fruition.
>> Um, so this is the first improvement
[1:24:41]
that's coming off of that in the form of
the driveway.
[1:24:44]
» So, and just to be clear, when he got
his construction permit,
[1:24:50]
he didn't have a driveway permit.
>> He did.
[1:24:52]
» He did.
>> Oh.
[1:24:53]
» Um, he did, but it
>> was from Ceda. And then when I know that
[1:24:56]
the first permit was issued by Michael,
>> um, but when we did a bit of review
[1:25:03]
looking at the attributes of the
driveway and then started seeing the
[1:25:07]
actual earth work happening on site, I
actually I I did a stop work um and I
[1:25:14]
spoke about it and and I gave him
direction that he needed to bring in an
[1:25:17]
engineer design. we were considered. We
were um concerned about a lot of the
[1:25:21]
design elements of this driveway
>> and so we did a stop a stop work order
[1:25:26]
and and then that was the the first time
we ever seen the engineered design and
[1:25:31]
then um Tom has come in and redefined
that design.
[1:25:35]
» Okay.
>> So can I just ask one more question?
[1:25:40]
» Actually two because that was the first
one. Um
[1:25:43]
let's see. Uh, so when did all this has
this been because that's been built
[1:25:47]
that's been going on for 3 years.
>> A really good question of how long um I
[1:25:54]
would say I think this was right when I
took over the directorship. So I think
[1:25:58]
it was right in 2022
>> that we started um on this project.
[1:26:03]
» Okay.
>> All right. Thank you.
[1:26:07]
Just a little more background to you
that when Michael says public road and
[1:26:12]
talks about the probate courts, probate
courts have the ability to essentially
[1:26:17]
subdivide property without county
approval. They can go in and any court
[1:26:22]
can go in and issue an order. And so
what happened is this property all got
[1:26:26]
essentially subdivided
these lots through court process, not a
[1:26:32]
county process.
And the court
[1:26:36]
uh put on the plat that these are public
roads even though I don't think we've
[1:26:43]
officially accepted any of those roads
or maintain them. So public roads is
[1:26:48]
kind of a a loose term not necessarily a
county road but it's really a little bit
[1:26:54]
undefined what public road means in the
context.
[1:26:59]
» Isn't there access from up above too?
>> That's where the contention comes in.
[1:27:04]
» Okay. Right.
>> And that belongs to
[1:27:08]
all.
>> So, I'm jumping ahead of
[1:27:14]
» We went we we went with previous council
and looked at what the plaque showed,
[1:27:18]
but we couldn't establish um an easement
that could be utilized in order to gain
[1:27:24]
access from up. And that was the first
solution that we tried to uh when I put
[1:27:29]
in the stop work orders, the first thing
I started working with our previous land
[1:27:33]
use council to see if we could go back
and establish access from a better
[1:27:37]
bearing point, a more reasonable access.
Um but we were unable to do that and we
[1:27:43]
did not have the cooperation from the
adjacent property owner.
[1:27:46]
» Okay.
[1:27:49]
» All right. Well, shall we hear from
Morrison Engineering?
[1:27:54]
How's the How's it going out there on
the driveway?
[1:27:59]
» How's I haven't looked at it in a little
bit, but we did drop some plans. Um, it
[1:28:05]
was pretty much a redesign from the
original permitted plan because there
[1:28:10]
was some unique features
in the permanent plan set that we didn't
[1:28:14]
understand why they were there or how
they could be built. They include a the
[1:28:20]
original plan said had an approximate 18
foot wall on the fill slope which is
[1:28:25]
this the steeper cobble slope that faces
the highway and a six foot wall uphill
[1:28:31]
side. It had a 30 foot wide uh platform
on top
[1:28:37]
that these return walls were built.
We a normal driveway width is 12 feet
[1:28:44]
wide. So why they drew it at 30 ft wide,
I don't know. And there was again a
[1:28:49]
retaining wall on the downhill side that
started partially
[1:28:54]
up the the steep slope. So it wasn't
protecting all the steep slope. This
[1:28:58]
proposed retaining wall. Talking the
Thompsons, they didn't want to build a
[1:29:04]
fill wall. I don't think they need to
build a build a fill wall. That means on
[1:29:09]
the the downhill side putting in a wall
and filling.
[1:29:14]
So maybe we could look at our plans.
Chance, I have my uh colleague Chance.
[1:29:19]
So my name is Tom Marson. I'm a civil
engineer and land surveyor. I own Marson
[1:29:25]
Engineering. I've been practicing in the
mountain since 1995 is my background.
[1:29:32]
Marson Engineering is about 20
personnel.
[1:29:36]
We
>> Yeah, if the host can enable a screen
[1:29:39]
share, we can pull up some of our plans.
Surely.
[1:29:48]
» Oops.
[1:29:56]
» Okay, you should have screen sharing
ability and I might have accidentally
[1:30:00]
muted you. Sorry.
[1:30:19]
Oops.
[1:30:26]
» Nice. We can see that. Um, but you're
still muted. Just FYI.
[1:30:33]
» She's good. Okay.
>> Give us a moment.
[1:30:40]
Is that large enough on an advisor's
end?
[1:30:43]
» Sure.
>> Mhm.
[1:30:46]
» Okay. So,
this sheet we call our site plan. It
[1:30:50]
helps us get orientated with
uh what's going on out there. The you
[1:30:56]
can see highway 24 and then you see a
lightly gray shaded um
[1:31:02]
road that goes up up the hill. That is
what they've built to date.
[1:31:08]
Um, and that roughly matches the
original design plan with the exception
[1:31:14]
of Can you guys see my cursor?
>> Yeah.
[1:31:20]
» Around here there was scheduled to be an
18t wall
[1:31:24]
and
for the request of the Thompsons and we
[1:31:29]
don't see why it was needed. We've we've
eliminated that wall and that steep
[1:31:33]
slope. But to get the proper slope
layback, the road had to move over into
[1:31:39]
the hill a little bit u from the
alignment that they built. So the darker
[1:31:45]
shaded area is
is the engineered road that we've drawn.
[1:31:52]
Um
a slight variance in the we're
[1:31:56]
requesting a variance which I don't
think should be a big deal. At the entry
[1:31:59]
it's a 40 foot radius and at the
switchback it's a also a 40 foot radius.
[1:32:04]
in total
uh 50
[1:32:09]
by the land use code.
[1:32:13]
So, we'll need some retaining walls. You
can see the bright green, that's a green
[1:32:18]
space. It's a two two-tiered boulder
retaining walls. What's proposed on the
[1:32:22]
uphill side?
Um the downhill side will just be
[1:32:26]
graded.
And I know there's a lot of concern
[1:32:30]
there. So, we did some studies and I'm
gonna have Chance look the pages here
[1:32:40]
section.
>> Yeah, we'll just cut to the deep steeper
[1:32:43]
part.
[1:32:47]
Um,
flip up to the plan view again. So, see
[1:32:52]
those crosssections? What about the
cross-sections?
[1:33:00]
this one. Okay, scroll in.
So, you see numbers like 5 plus 0 0
[1:33:09]
uh four 4 plus 0 0. That's where these
cross-sections are drawn. 4 plus 0 0 4 +
[1:33:15]
50 5 plus 0. And now we'll go back and
look at the cross-sections.
[1:33:32]
Um,
let's go to
[1:33:38]
here's an example of
of what we're proposing. It also
[1:33:43]
indicates what they've built.
You see that the blue line?
[1:33:50]
That's the steepest we'd want to stack
um this type of
[1:33:55]
mater one and a half to one. So for
every foot of drop, we need to go a half
[1:34:00]
horizontally.
Uh we have a more conservative design
[1:34:05]
with a dash line that's a 1.7 to one and
you can see what the existing slope is.
[1:34:13]
We did an analysis. We did the initial
topo on this property
[1:34:18]
and some of this has been disturbed but
not greatly. We compared the topos about
[1:34:25]
the same. So this slope had been
standing at at that layback for
[1:34:31]
um you know probably decades if not
longer.
[1:34:37]
We just pulled the road platform back.
You can see where they've currently
[1:34:40]
built the road platform.
And then at the tip of our blue line
[1:34:46]
here, you can see where the proposed
road platform is. This is one of the
[1:34:49]
worst uh crosssections, meaning more
challenging sections to get through. And
[1:34:55]
there's quite a bit of cut on the uphill
side that's not 100% refined, but we get
[1:35:00]
the idea that they're going to have to
move some material around to get this to
[1:35:04]
work.
[1:35:07]
Uh the red line that's vertical on this
cross-section indicates the right of
[1:35:11]
way. You know, on the left side, it's
the the highway rightway. On the right
[1:35:15]
side is the private property of that
vertical red line. And then the edge of
[1:35:20]
traveled way is marked with an X and a
and a little tag on the far left side
[1:35:24]
there.
[1:35:28]
At 1.5 to one or flatter,
it's not likely that a boulder will roll
[1:35:37]
or if it does, it won't go very far.
It'll alter to the toe of the slope, but
[1:35:42]
we're going to stop that they remove any
loose scree or boulders on there. And we
[1:35:49]
would anticipate that that the material
would be stable after that.
[1:35:56]
Hold on.
[1:36:00]
» Wait, can can I get clarification on
that real quick? You're going to request
[1:36:04]
that they remove any loose boulders or
any loose debris.
[1:36:08]
» Is that what Yeah.
Yeah.
[1:36:11]
» Okay. Thanks.
>> Who who would who would be responsible
[1:36:14]
for ensuring that that's happening?
>> Well, the
[1:36:21]
uh the contractor would be the one
responsible to make that happen. And I
[1:36:25]
think the county has requested that we
do periodic inspections on the
[1:36:28]
construction of this work. So, we'll go
out and
[1:36:33]
u confirm that they've built this to
what we intended them to build to.
[1:36:38]
» Great. Thank you.
[1:36:42]
» Hey Tom, this is Michael. I do have a
question if you want to go back to where
[1:36:46]
the access is to the highway.
>> I believe the speed up permit says that
[1:36:50]
has to be a 90°
access from the highway.
[1:36:55]
» And I think it turns really quick, maybe
leaving the highway.
[1:37:00]
» Okay, let's Our screen's got to catch
up. Just hold on.
[1:37:04]
» Yeah, it's trying.
There you go.
[1:37:10]
Okay. So, you can see in the light
lighter gray shading, that's what
[1:37:14]
they've built.
And you can see in the darker gray
[1:37:18]
shading, that's what we've designed. So,
we have a 40 foot tangent per the C dot
[1:37:23]
access code. So, it's a 40 foot
straightaway 90 degrees to highway 24.
[1:37:30]
Um,
so,
[1:37:33]
so it will be a 90 degree um axis.
Okay.
[1:37:39]
» The original plan was not drawn that
way.
[1:37:42]
» Ends right there in that in the green
section. That's all the right away
[1:37:46]
that's permitted
with the seat out permit.
[1:37:52]
That 40ft toner looks good.
>> We realize that in these challenging
[1:37:56]
terrain situations, it's not always
possible. So, it's good to see that much
[1:38:02]
is possible.
[1:38:08]
Who was just making those comments? Uh,
>> it's Mark Bunnel from Ced.
[1:38:13]
» Do you guys ever allow a variance to the
40 foot tangent?
[1:38:18]
uh occasionally
the
[1:38:23]
» it's the variance would be more on the
the 40 foot length because we want that
[1:38:28]
passenger car to be able to pull up and
have good sight line both directions.
[1:38:35]
So it would be more about shortening the
40 foot before we would entertain
[1:38:41]
uh something that's not perpendicular to
the highway.
[1:38:47]
Um, sure. So, that's that's where I was
going. We've been meaning to reach out
[1:38:51]
to you and we've kept catch you live in
front of everybody, but uh um it might
[1:38:56]
help these guys a little bit where we
see that green wall or we see a boulder,
[1:39:00]
a green space, and a boulder wall. We'd
be able to reduce that a little bit if
[1:39:04]
we could reduce that tangent. But I
wanted to get this concept in front of
[1:39:08]
everybody. If it's if it's liked, this
is a 90% set. If it's not liked, then
[1:39:14]
we'll,
you know, we'll go back to the drawing
[1:39:17]
board and and tweak it per the requests
of this meeting or
[1:39:22]
from the county.
But, um,
[1:39:27]
regardless of that radius is proposed at
40, that tangent might be able to be
[1:39:31]
reduced a little bit, but it will be a
90 degree axis.
[1:39:35]
Um once we get up to station 2 plus 0 0
we'll be in that alignment.
[1:39:43]
So reducing that tangent would just pull
this out of the hillside a little bit
[1:39:47]
and less walls would need to be built
less earthwork.
[1:39:52]
But again, this alignment once we get
through this uh
[1:39:57]
these corners would would follow the
same track.
[1:40:08]
» Yeah, you answered my question.
>> So, just talk with go through Brian
[1:40:14]
Kellian on that request on the variance.
[1:40:26]
or Nick if you're at that stage in the
process. Nick, no request.
[1:40:36]
» Um,
[1:40:40]
so just really from um
0 plus 40, which it means 40T from the
[1:40:46]
highway to 2 plus 0. That would be just
modified a little bit if we could
[1:40:51]
shorten up that tangent, but otherwise
the the road going up the slope, uh the
[1:40:56]
driveway would be remain in its same
location. We're proposing a 16 foot wide
[1:41:01]
platform
and that's what's drafted here and
[1:41:04]
shaded with 12 feet being the traveled
way and a 4ft buffer
[1:41:10]
uh for guard rail or
they might want to do earth and burm or
[1:41:14]
boulders or something. But there needs
to be some protection to prevent
[1:41:18]
vehicles from going over the side of
this boat.
[1:41:30]
We have a a pull out proposed up at the
switchback.
[1:41:35]
Since they've already graded that area,
it's not a big deal for them to in
[1:41:39]
install that.
We probably
[1:41:44]
place one at the midpoint between the
entry and the uh switchback. Also, less
[1:41:50]
robust that you see there.
[1:42:02]
So, kind of our hope today was to bring
Tom in, answer any um questions about
[1:42:07]
the design that the board had. Um, also
let you know that this will be put into
[1:42:13]
final review and then final approval of
the driveway would be in um Michael's
[1:42:18]
court to review the design um approve
potential variances from the county
[1:42:24]
standpoint and then um direct them to
work with Brian um or C do on any
[1:42:31]
variance requested on the access permit.
Um, wanted to create some awareness that
[1:42:37]
that's where your staff is working on
ensuring the safety of this driveway and
[1:42:42]
and ensuring compliance with our code is
as well as working with CO for
[1:42:46]
compliance on the access. So happy to
answer any questions you might have.
[1:42:51]
Thank you.
[1:42:55]
» I don't have any questions. Uh, Andy, do
you have any questions? you know, I
[1:43:01]
don't have this spells things out really
clearly for me and will give me a little
[1:43:06]
bit of information to relay back to any
concerned public members. Um, and all of
[1:43:13]
this information that we're looking at
right now, is that something that you
[1:43:17]
have ready access to to allay um
concerns? I mean, this has been a a
[1:43:25]
pretty contentious topic. Um, I know
that the BOCC has been uh
[1:43:32]
um approached in in not entirely
professional manners about how this
[1:43:37]
whole thing's been um handled. And I
just want to make sure that we we can
[1:43:43]
get all this information out to the
people who who might have the wrong idea
[1:43:47]
about how all this is going down.
>> Absolutely. This information is
[1:43:52]
available in the teams folder. We
provided the preliminary design like um
[1:43:56]
Thomas indicated that we're at like 90%.
So we haven't fully approved this yet.
[1:44:00]
It's still in review, but this
everything that we have in the building
[1:44:04]
department um is transparent and
sharable. So um but this particular
[1:44:09]
design is in your team's folder now.
[1:44:14]
» Okay, great. Thanks. I'm try I've been
trying to open it and it's like real
[1:44:17]
glitchy, but maybe it's um because I'm
trying I'm on my computer watching the
[1:44:22]
meeting and I'm trying to open it on a
mobile device. So, it's probably it
[1:44:26]
probably takes a lot of processing power
to look at these files.
[1:44:31]
» We'll go ahead and just um I can send it
directly to your email if you'd like.
[1:44:39]
» That would be great. Thank you.
[1:44:48]
Well, Mark, thanks for working on that.
We appreciate it. And uh keep keep an
[1:44:53]
eye on them and we'll move forward with
this.
[1:44:59]
» We'll try and move forward.
[1:45:03]
» Thank you.
[1:45:07]
» You're welcome everybody.
>> There's any further questions, let me
[1:45:11]
know.
Appreciate it.
[1:45:16]
» No questions from us and
good luck.
[1:45:23]
» All right. Thank you.
>> Okay.
[1:45:27]
Okay. So, a real quick uh interview
before we completely leave the the state
[1:45:32]
highways and move to this the discussion
about the the Grand Canyon USI
[1:45:35]
deliveries. Just for board awareness, um
a recent development and I saw Kurt
[1:45:40]
Schweer was here a moment ago. Looks
like he had to step out. But um Kurt had
[1:45:44]
approached the Friends of Twin Lakes
board in the county about potentially
[1:45:47]
collaborating on a grant um down in in
uh Twin Lakes. It was a DOT grant
[1:45:54]
specifically around federal lands
access. Um and they were thinking
[1:45:58]
creatively about how they could utilize
this funding to create safer access and
[1:46:03]
crossings um from the village side uh
onto the federal land. The parking area,
[1:46:08]
rest area, and the trails are over
there. Um given the timeline of that
[1:46:12]
grant, you know, both friends of film
lakes and the county really didn't have
[1:46:16]
capacity to pursue that. We need to
really think through what a partnership
[1:46:19]
could potentially look like related to
that. But um one thing that did come out
[1:46:23]
of the discussion that we've been
running down on uh the county side um as
[1:46:27]
friends of Twin Lakes has asked for us
to place some traffic counters right
[1:46:31]
down there at the village so we can get
a a good count and some data for
[1:46:35]
potential future grant applications that
might consider some safety measures
[1:46:39]
across Highway 82 there. So um nothing
more for real discussion at this point
[1:46:43]
unless you have questions, but that was
just an awareness item for everyone. I
[1:46:47]
think we're we're we have one piece of
information left uh to get the approval
[1:46:52]
» traffic control.
[1:46:56]
Put a traffic counter across
>> there.
[1:47:00]
All I have to get the permit.
>> Do you have you have your own counter?
[1:47:04]
» Yeah.
>> The two counters.
[1:47:10]
» Yeah.
And so we're hopeful to have that place
[1:47:13]
for Labor Day weekend to get a kind of a
busy weekend down there to get a really
[1:47:16]
sense of the the traffic counts, but
unfortunately Kurt's not here to say
[1:47:20]
thank you directly to, but we appreciate
them sort of thinking through those
[1:47:23]
partnerships and bringing that our
attention down there. So
[1:47:28]
» um any questions about that one or go
ahead and move ahead?
[1:47:33]
» Okay, Mr. Day, I believe we'll pass the
the microphone to you to give us some
[1:47:37]
background on the semi trucks.
>> Sure. Sure. It's Grand West Estates and
[1:47:42]
um you know I guess I just want to take
the opportunity to to thank M and his
[1:47:47]
team. It's taken a few years but you
know we've made there have been a number
[1:47:51]
of improvements made there. Additional
speed limit signs and in strategic
[1:47:56]
places um the little yellow tags that
say what do they say? No no no exit or
[1:48:03]
» no exit you know on the culde-sac roads.
Um striping on the on the highway was
[1:48:09]
refreshed a couple of years ago. Um
what else did you do? Um
[1:48:15]
» signs we did paint yellow lines on the
road.
[1:48:20]
» The yellow tags
[1:48:24]
on that road. That's what's in the
package. A lot of information from the
[1:48:29]
county. So, um, thank you.
>> So, I just wanted to thank thank the
[1:48:34]
county and Michael in particular for,
you know, for doing all of that.
[1:48:39]
actually met all our our requests except
for for one that has a se dot
[1:48:43]
implication as well that not just um
county road 99 but other county roads
[1:48:49]
are are weight limited for for heavy
trucks, you know, but if you're driving
[1:48:54]
down a state highway, um you have no way
to know until you make the the turn that
[1:49:01]
that is a county road and it's it's
weight restricted. So, I guess my, you
[1:49:06]
know, my question is, is there is there
any way to put signage, you know, when
[1:49:11]
you're entering the county on on state
highways to, you know, indicate that
[1:49:16]
that county roads are, you know, are
weight limited. Otherwise, you know, a
[1:49:21]
semi-truck turning, you know, turning on
to County 99, you know, sees the weight
[1:49:26]
limit sign, you know, maybe 50 feet on
down the county road, but, you know, has
[1:49:30]
no choice but to, you know, but to keep
going. So, how, you know, just from a
[1:49:35]
general perspective, is there any way to
to alert, you know, truck drivers to to
[1:49:41]
wait restricted roads before they
actually turn on to them?
[1:49:46]
» Yeah. So, it's it's not a problem. I
mean, we can absolutely permit a sign
[1:49:49]
that says, you know, intersection ahead,
name of the intersection, maybe it has a
[1:49:54]
placard that says weight restrict or
something like that. It's no problem at
[1:49:58]
all.
>> So, what's the procedure for doing that?
[1:50:01]
send us a request and what the sign
would look like and we would do a simple
[1:50:06]
special use permit for that. Okay.
>> Okay. And I know the agenda item had an
[1:50:12]
intriguing thing about about semi
trucks, you know, and um you know, there
[1:50:18]
was one issue a few years ago where this
came to point that Loop and Lane is one
[1:50:22]
of the culde-sac roads off of County 99
and in the middle of the winter, you
[1:50:26]
know, a semi-truck had had turned right
onto Loop and Lane, gone up the hill,
[1:50:32]
you know, and then there was a culde-sac
turnaround and gotten completely stuck.
[1:50:35]
Um why? Google Maps must have told them,
you know, what to do and they, you know,
[1:50:41]
that's why the the yellow tails are
helpful to indicate the culde-sac roads
[1:50:45]
have no have no exit. So, that was the
intriguing uh teaser on the on the
[1:50:51]
agenda item. It only happened once, but
it created, you know, quite a bit of
[1:50:55]
chaos to get that truck, you know, I
think they had to back out or something.
[1:51:00]
I don't I don't remember the
particulars. Um, so, um, the only other
[1:51:06]
issue with County 99 that that we
broached both to Michael and and the
[1:51:12]
sheriff was was enforcement. It's turned
into a real racetrack. Um, there have
[1:51:18]
been several several accidents. Um Dan
may know about this on the you know as
[1:51:24]
you're going west and you make the curb
and you go down towards Leadville
[1:51:28]
Junction. There have been several
several cars that have you know gone off
[1:51:32]
the road at a high rate of speed on the
downhill side actually knock trees down.
[1:51:37]
One of them a couple years ago just
broke a tree. I don't think it was a
[1:51:40]
fatality, but you know, but um you know,
increased enforcement, not on just on
[1:51:47]
99, but on all county roads, I think, is
is um you know, is is warranted
[1:51:54]
recognizing the resource limitations,
but but there's uh you know, there's a
[1:51:59]
lot of speeding on on County 99. I think
Nabel can probably attest to that as
[1:52:04]
well. Um um so you know so greater
enforcement um it'd be real easy for a
[1:52:11]
sheriff's deputy to park on one of the
culde-sacs and just do a radar hit as of
[1:52:16]
traffic uh traffic going by. Um, you
know, so that's just our, you know, our
[1:52:22]
last request is some way, you know, to
increase enforcement, not just on this
[1:52:26]
road, but, you know, but all county
roads. And again, it'd be interesting to
[1:52:30]
know, you know, how many speeding
tickets have been issued on county road
[1:52:34]
99 if
>> the exact way everybody uses and they go
[1:52:39]
from 99 to get on to 24, but then it's
90,
[1:52:44]
» four, then five. It just continues.
maps will actually route you that
[1:52:49]
direction if you're coming from the
south 24.
[1:52:53]
» Mhm.
>> You know what else I noticed too is it's
[1:52:56]
a great right where the trees end there.
That's a great place to throw your beer
[1:53:01]
cans.
>> Oh yeah. Oh yeah. Yeah. It's a
[1:53:06]
» that the both sides of the road this
thing are just lined with garbage.
[1:53:10]
» Yeah. we're easily able to assess what
the drinking trends are in Lake County
[1:53:15]
just by picking up trash along that
along that road. Um but again, did the
[1:53:21]
traffic count? So, so we'll see because
because of all the traffic um you know,
[1:53:25]
but but um appreciate appreciate the
efforts to uh you know to uh you know to
[1:53:32]
make those improvements. It only took
three or four years, not six years. So I
[1:53:37]
guess we feel very lucky.
tenacity as its uh rewards, Pete.
[1:53:46]
» Okay. Shall we move on to this next item
and let Are you all done? Josh, how can
[1:53:52]
we follow up? Who's going to follow up
on that? So,
[1:53:54]
» I do have some information to share. I
know it's in the package, but
[1:53:57]
» Okay.
>> Just some speed statistics on that road.
[1:54:01]
» It's really scary.
>> 95% of the people drive faster than 90.
[1:54:08]
» Yes. 90 miles an hour.
>> Yeah, that speed was recorded at 99.3.
[1:54:13]
» I'm sorry. You said 90% of the people
who drive on that road go 90 miles an
[1:54:18]
hour.
>> 95% 95 percentile is higher than 90
[1:54:24]
miles an hour. 85.9.
>> Wow.
[1:54:26]
» Oh, the 90th percentile.
>> 95%.
[1:54:29]
Whoa. That's super different. Wasn't
there a little uh underground um kind of
[1:54:36]
racing scene that was popping up over
there by Leadville Junction for a
[1:54:40]
minute? Like I could I felt like I could
hear them from Leadville North and uh
[1:54:46]
you could and then you could see the
burnout marks everywhere. Um I thought
[1:54:50]
that was but I haven't heard it in in in
a year or so maybe. But it was something
[1:54:53]
that I wonder if anybody had any uh
recollection of.
[1:54:59]
No, they just like speeding on that
road.
[1:55:01]
» Yeah,
>> they're in a hurry.
[1:55:04]
» Yeah, that I mean, you're talking about,
you know, maybe speed cameras on on
[1:55:09]
state highways, but certainly there's
also opportunities for speed cameras on
[1:55:14]
on county roads, especially where there
are the big, you know, the big
[1:55:18]
straightaways.
Um,
[1:55:22]
» I'm honestly curious what he's like
patrolling is like.
[1:55:27]
I think this has come up multiple times
in this room and we haven't really got I
[1:55:32]
do wish he was here today. We haven't
really gotten much of an answer from him
[1:55:35]
about
patrolling practices,
[1:55:40]
especially in some of these hot spots
around the county.
[1:55:44]
» That's a good question, Elsa. I feel
like Mountain View kind of funnels right
[1:55:47]
into the whole Leadville North area,
too. And it's the same sort of situation
[1:55:53]
all the way down Mountain View. It's
really hard to pull out. It's a 30 mph
[1:55:57]
speed limit, but nobody drives 30 on
Mountain View.
[1:56:02]
» I do.
>> I do.
[1:56:04]
» Just to be clear,
>> I do.
[1:56:06]
» I catch myself sometimes.
>> Low speed on this road, too, at 9.2
[1:56:10]
miles.
>> There's Michael around again.
[1:56:15]
» Holding up traffic.
>> Yeah, it's boring to go that speed on
[1:56:19]
that
speed.
[1:56:23]
» Get a copy of it. We can have that.
>> Oh, perfect. Thank you.
[1:56:28]
» Well, one way to increase speeds is to
repave everything. So, that's next on
[1:56:33]
our uh agenda here, the 2026 pavement
pole repair schedule.
[1:56:41]
» Thank you guys so much,
>> guys. Thanks for coming.
[1:56:43]
» You bet.
>> Thank you so much.
[1:56:46]
» Thank you.
>> Yeah, I think I get out.
[1:56:49]
» Okay, Sean.
>> Have a good day. Appreciate you.
[1:56:51]
» Thank you. Thanks, Charlie.
[1:56:56]
Um, can we pull up the website
information on the website?
[1:57:02]
» The website.
>> Lake County website.
[1:57:05]
» Yes.
>> Lake County website.
[1:57:07]
» Go to the Google or the Chrome.
>> Yeah.
[1:57:11]
» Which one? What are we pulling up?
>> Um, go to road bridge or public works.
[1:57:19]
» Bridge.
>> Public works. Road bridge.
[1:57:25]
down the bottom is on the side for the
last tab on the left side
[1:57:31]
» plan
for the next five years.
[1:57:35]
» Could we screen share this if you guys
are looking at something I can't see?
[1:57:39]
» Yes. Thank you, Andy.
>> Thank you.
[1:57:49]
So currently everything in the light
blue color is what we're supposedly
[1:57:54]
doing this year until we just got cut
out from our asphalt source.
[1:57:59]
» Oh, really? Bummer.
>> Um because they weren't able to make
[1:58:02]
enough material being shut down with the
willow fire. So
[1:58:06]
» got it.
>> Um I'm working on backup plan of buying
[1:58:11]
asphalt from BV again. Um, it just means
higher price asphalt.
[1:58:17]
So, I haven't figured out exactly what I
have to cut out of this year right now.
[1:58:22]
Um,
>> our asphalt plants off of
[1:58:24]
» the RSA plant will not be operational.
Um, people that are out there that were
[1:58:30]
out there making are out there making
asphalt right now. So, it would be 3 to
[1:58:35]
5 million to replace that or to bring it
up to specification.
[1:58:39]
» No operation. So, $30,000 in there is
not going to touch it in my budget.
[1:58:46]
» Dang.
>> Um, but we have started county road 11
[1:58:51]
already. We've got the east side lane
almost to Highway 300.
[1:58:58]
» Um, the other side we got about 50%
before they quit making asphalt for us.
[1:59:04]
Um, so we will definitely finish that.
We need to get asphalt over the bridge
[1:59:09]
on county road 5A. The blue kind of blue
dot over on that corner of the loop.
[1:59:16]
» Um I would would love to do 9D and the
bottom of Mountain View cuz there are a
[1:59:24]
lot of traffic and they're pretty well
torn up. Mount that part of Mount View
[1:59:28]
was not the big project going from Mount
V from Highway 24 to um Silver Hills.
[1:59:41]
Once we get if we can get a lot of this
done, that ties a whole lot of
[1:59:46]
roads that everybody uses
100% use at some point or another. And
[1:59:53]
then the next few years, we can start
looking at moving into town doing
[1:59:58]
streets. I was just talking to Matt
earlier about writing some letters to
[2:00:02]
get them out to residents, utilities,
and stuff that if they're going to need
[2:00:08]
to put something in the road like sewer
lines, gas lines, water lines that they
[2:00:12]
get it done
>> before this time because they won't be
[2:00:16]
allowed to do it afterwards for at least
two years. Correct. Um, so we don't have
[2:00:21]
like what happened out here on Sixth
Street where they repaved it and the
[2:00:25]
next year they're kept it up or cut it
up and they're doing more of it now.
[2:00:32]
» So looking at
there is a legend. You probably can't
[2:00:36]
see it, but the next year is Red Lines.
>> Mhm. 2027.
[2:00:43]
And there's those streets in town, but
there's also some down towards Twin
[2:00:48]
Lakes and some patching down around
toward Fin Lakes.
[2:01:04]
The
>> room 10 down there is a big one, but I'm
[2:01:07]
also looking at some other options with
that one because the asphalt is actually
[2:01:10]
still in pretty good condition. It just
it's cracked and the cracks are sinking.
[2:01:15]
So, if I can get those filled up and
maybe do a couple of chip seals over the
[2:01:19]
top of it, kind of like we did the
airport.
[2:01:21]
» Yeah.
>> Um I know it's airport's coming back,
[2:01:24]
but that was like six or seven years
ago. Um I get some more life out of that
[2:01:29]
asphalt cuz it's actually good asphalt.
A lot of our asphalts are really good.
[2:01:33]
That's why I'm just doing overlays right
now and then come back and do um chip
[2:01:38]
seals over the top of them to make them
go another 10 to 15 years.
[2:01:43]
» And like Grand West, we've done we did
with Grand West and a bunch of those
[2:01:46]
roads out there
>> and they're all in really good condition
[2:01:49]
still. So,
>> yeah.
[2:01:51]
» Um
that's our plan. Um and like I said,
[2:01:56]
there is a legend on there someplace. I
just don't know where it is. I think
[2:01:59]
it's behind where the cameras are.
>> It is upper right hand corner. Um, but
[2:02:02]
you can see all the years broken out up
to 2030. And it also has our bridge
[2:02:08]
projects on there that we're supposed to
be doing. Um, this summer we're supposed
[2:02:13]
to be doing one for the Forest Service
up in Half Moon Creek. Um, we we're
[2:02:19]
supplying labor, but it's part of that
grant, too.
[2:02:24]
Um, I was hoping to get be able to get
two this summer, but I don't even have
[2:02:29]
the bridge for can't even for order yet.
I'm still waiting on engineering.
[2:02:36]
» So, that will probably be next to the
bridge.
[2:02:41]
» County Road 4 is up in the air. We just
don't know what we're going to do there.
[2:02:47]
» Yeah. I mean, the bridge is being
designed. It's almost to where they can
[2:02:50]
order it.
>> Oh, I see. if they're just working with
[2:02:52]
the bridge people to make sure it fits
in everything in there right now. Okay.
[2:02:56]
» So, the final plan should be available
to construct the bridge or to
[2:03:01]
manufacture it. Um I just don't know if
we'll get it in the ground this year.
[2:03:05]
» To clarify, that's not at the turquoise
closure,
[2:03:08]
» right?
>> Yeah, that is that one is still very
[2:03:10]
much up in the air. useful.
>> And I think um for just bigger picture,
[2:03:17]
this this um agenda item was I think a
commissioner bulk request and part of it
[2:03:22]
was to provide you all some information
as to how to respond as you're getting a
[2:03:26]
lot of public comment and people
reaching out to you about what's going
[2:03:29]
on with XYZ Road.
>> Yes. Um, one of the things that we
[2:03:33]
realized through one of the outreaches
is that um, for some reason the color
[2:03:39]
coding got turned off on this map and so
it's always been public and available
[2:03:43]
for people to look at the coming year's
paving plans, but um, all of the lines
[2:03:47]
were showing as black for some reason.
So Michael and and Ann worked with
[2:03:51]
Shelby to get this updated so that it's
it's showing according to the legend
[2:03:55]
now. So, at least gives about a fiveyear
outlook um in terms of what we're
[2:03:59]
planning. Um and you know, Michael kind
of referenced this, but sort of a lot of
[2:04:05]
headwinds going against us this year in
in terms of getting a lot of this
[2:04:09]
accomplished. So, the fire obviously
stalled everything that had this
[2:04:13]
reciprocal effect of u being able to
make asphalt. Um the the folks at United
[2:04:18]
companies who we have the agreement with
are working on the highway 24 projects
[2:04:22]
both north and south of town. Um, so
they have basically they have enough
[2:04:27]
asphalt to do those projects, but no
more to sell to us at the reduced rate,
[2:04:31]
which is kind of what our agreement
stood at. So
[2:04:33]
» they they did supply the contracted
amount to us. So I can't complain about
[2:04:36]
that.
>> They they told us that they give us
[2:04:39]
a,000 tons at no cost for using the
pavement material.
[2:04:44]
» And I could purchase more at $79 that
time instead of $95 a time. Mhm.
[2:04:50]
» But because they weren't able to crush
all the material they needed, um they're
[2:04:55]
strapped with what they can do for C
dot. So,
[2:04:59]
» okay.
Yeah, I guess helpful like having now
[2:05:02]
looked at this, you know, summer 2026
what we've planned. This is all planned
[2:05:07]
based on it's timely because we're
having the budget discussions for next
[2:05:10]
year, how much we want to put towards
paving towards, you know, across all
[2:05:14]
departments, but in particular as you
look at this, if it raises any questions
[2:05:19]
or concerns about should we be doing
more, why isn't this getting done versus
[2:05:24]
that, that's certainly the time if you
have any guidance for us about how you
[2:05:28]
would want to budget for that for this
coming year. Um we we can plug that into
[2:05:32]
the budget numbers that you ultimately
have presented in a couple months a
[2:05:36]
month and a half or so.
>> I think it's important to note that
[2:05:39]
because he Michael and you know road
bridge fund any money he did not spend
[2:05:44]
this year does not leave his fund.
>> It is still in the fund.
[2:05:49]
» We would just be bud. So, you know, when
you do your budget, you've got your
[2:05:52]
beginning fund balance, your revenue,
your expenditure, your ending fund
[2:05:56]
balance, and that ending fund balance
just can't be in the negative. So, I
[2:06:01]
feel like I should explain this because
I think there was some misunderstanding
[2:06:05]
of the public. Anytime we don't touch
the money in a fund, it just stays in
[2:06:11]
the fund and is available for use the
next year. I think there are a lot of uh
[2:06:15]
comments about deficit spending and
especially in the Ronin Bridge fund. If
[2:06:20]
something changes and we didn't get to a
certain amount of paving this year, that
[2:06:25]
money is available. We just plan it. We
plan to use it. We show that we plan to
[2:06:30]
use part of that fund balance.
It's not really deficit spending,
[2:06:35]
especially if you built up the reserve.
Um, which we have. We've built up the
[2:06:41]
reserve across many of our funds. Um, so
in terms of like the road and bridge, if
[2:06:46]
we plan to do more next year, you know,
based on what Michael knows he can
[2:06:50]
accomplish, we're okay to touch that
money we did not spend this year because
[2:06:54]
it's sitting in his fund available for
use. So I think that is also helpful,
[2:06:59]
you know, to know. It's not like, you
know, if you're in the general fund like
[2:07:02]
Ann's right here, she's in the general
fund. She doesn't keep a balance. That
[2:07:08]
rolls back up to our general fund
reserve, but it's a little different.
[2:07:12]
» Yeah. Candace,
>> go ahead. Go ahead, Andy.
[2:07:17]
» Oh, um, I was gonna say, is that like a
good talking point for um the convert
[2:07:22]
like converse uh questions we get as
well when people are like, "Oh, well,
[2:07:27]
you didn't spend any money on snow
plowing this winter, so why aren't my
[2:07:31]
roads getting paved?" Is that kind of
like the same way you'd want to talk
[2:07:35]
about that as well?
>> Yeah. I can't take money that was And
[2:07:39]
that's not how dual budgets work. I
can't take money that was appropriated
[2:07:42]
for one purpose. You guys did a
supplemental. We appropriated a certain
[2:07:46]
amount of money for grooming, whatever,
whatever it is you appropriated for. I
[2:07:51]
don't get to go plunk it in another fund
and use it for a different purpose. Uh
[2:07:55]
you'd have to amend the budget at that
juncture to do that. You can do that. Um
[2:08:01]
but if we haven't spent money on
something, it just goes right back into
[2:08:04]
our fund balance. So at the end of 25
um we had a couple million I can't
[2:08:13]
remember exact the exact amount without
looking at a fund balance for the end of
[2:08:16]
last year that we didn't spend and we do
that every year we bring in revenues so
[2:08:21]
we will plan to spend them something
changes or you know we didn't fill every
[2:08:25]
position we thought we would fill that
happens every year uh and then that
[2:08:29]
rolls back up into our savings account
and is available for use in the next
[2:08:33]
year should something come up that or
that we want to invest in like landfill.
[2:08:39]
So that I think that is important for
people to understand.
[2:08:45]
» So Michael, I remember last year we were
talking about your bath plant and you
[2:08:50]
had some machinery that you thought you
could get working on. That's not
[2:08:54]
happening anymore. That's not possible.
>> Um no, cuz I put like 30 grand in the
[2:08:58]
budget to start working on that and
start building it up. Um,
[2:09:05]
this asphalt contractor said he just
rebuilt one like ours and it cost him $3
[2:09:09]
million.
>> Got it.
[2:09:11]
» I I need $33 million for something else,
not an asphalt. Not saying that it's not
[2:09:17]
a good idea to get it that way, but you
know, I think we need a land more than
[2:09:22]
» Yeah. And so, in the future, where will
we get our asphalt? Um, you know, unless
[2:09:28]
that we have somebody using a pit close
in in the county like ours or even ACAs
[2:09:34]
where we can buy it from them, it's get
going out of the county to purchase it.
[2:09:37]
» Okay.
>> I don't like that, but
[2:09:41]
» it's like a two-hour trip to go to BB to
get asphalt.
[2:09:46]
» Wow.
>> Keep the operators.
[2:09:50]
You got two out right now.
>> Yeah. keeping a crew that I can help pay
[2:09:55]
with cuz I got two that are out sick
right now. One just got out of the
[2:09:58]
hospital the other day.
>> Unfortunately, the same problem I had.
[2:10:02]
» Um,
so it's really been really tough this
[2:10:06]
year to, you know, keep moving forward
with stuff. I was planning on being
[2:10:10]
paving by June 1st.
>> Yeah,
[2:10:12]
» they put it off to the 20th. They put it
off to the 1st of July and we just
[2:10:17]
started paving like two weeks ago. Okay.
Control part of the willow fire.
[2:10:23]
» Y
>> and you couldn't get to the pitch that
[2:10:26]
was in an evacuation zone. So they
couldn't get there.
[2:10:31]
» Does ACA ever make asphalt regularly or
do they need a contract from the state
[2:10:36]
or somebody else?
>> Um yeah. No, they make ACA makes asphalt
[2:10:40]
regularly but they don't make it up
here. Right.
[2:10:42]
» They need a contract from the state to
make it up here. Yeah.
[2:10:46]
» They make it all the time.
A lot of times in the winter time down
[2:10:51]
there, too.
>> Yes.
[2:10:53]
» Where we can
>> they just like to know in advance how
[2:10:56]
much.
[2:11:00]
» Wow. That's two trucks every two hours
trying to pave.
[2:11:04]
» Yeah. Miles of road.
>> And if I only have two drivers, that's a
[2:11:07]
long day.
[2:11:11]
» Goodness,
>> that is slow.
[2:11:12]
» So, this week we're not paving. Um, we
plan to pick it up next week, but then
[2:11:17]
the following week, the guys are out of
town at a conference.
[2:11:21]
» I'm staying in town, but
[2:11:26]
» Wow.
>> It's hard to believe that it's September
[2:11:30]
already,
>> is it?
[2:11:32]
» I did also,
>> um, also on the website there, there are
[2:11:37]
service requests. There's a a place you
can go to service request. Mhm.
[2:11:42]
» Anybody can put a service request in
anytime. If there's a pothole that needs
[2:11:46]
to be filled that we don't see because
we didn't drive that road for a while.
[2:11:51]
» Um, put a service request in. It's
trackable so I can make sure that the
[2:11:56]
guys get it done. Um, I know we do that
a lot people putting requests.
[2:12:02]
» Where where's the service request? On
the website.
[2:12:04]
» It's on Yeah, it's under public works.
>> Okay.
[2:12:06]
» And actually, there's a bunch of tabs
all over for that service request.
[2:12:11]
» Got it. It's on the first page where the
departments are. I think it's underneath
[2:12:15]
public works, but it's clickable there.
>> Okay.
[2:12:18]
» Well, cool. That's good information.
That's that's great.
[2:12:21]
» And you know, maybe we weren't plowing
this winter, but we were doing a lot of
[2:12:25]
potholes.
>> Um, we did do a lot of other work like
[2:12:29]
signage
um all over the county.
[2:12:34]
» That wasn't Oh, I'm sorry. That wasn't
me saying that. That was just questions
[2:12:39]
I get from the the community. I know you
guys were working your butts off all
[2:12:43]
winter.
>> We we had several people call us on
[2:12:45]
that.
>> Yeah.
[2:12:48]
» Do you guys re use that rock uh
the stuff from Wyoming that comes in a
[2:12:54]
bag? Is it called rock sal?
>> Rock asphalt.
[2:12:57]
» We we do have we have been using some of
that especially in the winter time.
[2:13:01]
» Yeah.
>> Gets kind of expensive. I can get you
[2:13:03]
know stuff cheaper in Denver.
>> Yeah. But I like that because it's got a
[2:13:08]
three-year warranty and I'm waiting to
use that threeear warranty up there. But
[2:13:11]
it seems like the asphalt keeps breaking
out around that and not that material.
[2:13:17]
» Would that work well in the cracks on
the millboard?
[2:13:21]
» Um it could
>> rock asphalt. How do you apply it? Do
[2:13:25]
you just shovel it in
>> and then tamp it down? Um you don't have
[2:13:28]
to do anything else with that cuz it's
asphalt. It's rock. It's impregnated
[2:13:32]
with asphalt.
>> Yeah.
[2:13:33]
» Naturally. And they they mine it with
that in there. And so it sets up really
[2:13:39]
nice.
>> They did the big one by Grand West
[2:13:45]
sign in Grand West in the highway.
>> Big one.
[2:13:49]
» The Rockwell guy put that out there.
Filled that hole for a test.
[2:13:58]
» Yeah. He's proud of us.
>> He is. Do you do you guys remember about
[2:14:02]
how much that was a bag and what kind of
minimums were needed to order a batch of
[2:14:07]
that?
>> Um, it cost me for um a China cost me
[2:14:12]
$1,700.
But that I don't pay shipping on that or
[2:14:16]
anything where if I go to Denver to get
15 tons, it's about $2,000
[2:14:21]
and we go through 15 tons pretty quick
and it comes back out. We replace it.
[2:14:25]
» Pick that up.
>> We have to pick it up. Mhm. So, got an
[2:14:29]
operator on the truck.
>> So, it's one ton for 1,700 or 15 tons
[2:14:34]
for
>> three grand, something like that.
[2:14:38]
» Wow. What are we going to do?
>> We go to Denver quite a bit.
[2:14:42]
» Yeah.
>> And it comes in bags.
[2:14:45]
» Um Yeah, that does. We, you know, um
they deliver it that way.
[2:14:48]
» Wow.
>> And it it shovels out. I'm not quite
[2:14:53]
sure how the mechanics of it work.
>> Yeah. because you can shovel it out of
[2:14:57]
the bag under the ground and then pack
it and it's it's back in there.
[2:15:00]
» That's cool.
>> And we were told not to use any
[2:15:02]
mechanical
>> means of doing it like compactor or
[2:15:07]
anything.
>> Wow.
[2:15:10]
» Would that work on somebody's dirt
driveway? Could you spread it out?
[2:15:13]
» I don't know. You probably could. It
might be a little bit expensive to get
[2:15:16]
here, but I mean that's what they use in
Texas on their highways, so they just
[2:15:20]
roll it out on the highway.
>> Wow. Cool.
[2:15:32]
» Well, great. Thank you for the updates.
Anybody else have questions for
[2:15:37]
» Roaden Bridge?
>> No questions for me. It's one of my
[2:15:41]
favorite subjects, though. Just going to
say that.
[2:15:45]
» I will say that County Road 10 coming
off the Twin Lakes is rugged.
[2:15:51]
» It is. And I I don't like driving that
one no more myself. I usually take 24.
[2:15:56]
Even though it's got some bad spots,
too. And that's why on the on the map
[2:15:59]
it's got some patches on it, too.
They're hard to places that are pretty
[2:16:03]
bad.
>> I have a question that's not road
[2:16:07]
related. Just since you're here,
Michael,
[2:16:10]
um do you think it's possible like that
Dutch Henry project will happen this
[2:16:14]
year?
>> I'm pushing it really hard.
[2:16:16]
» Okay. He's working on the permit for the
um
[2:16:21]
core of engineers right now.
>> Okay.
[2:16:26]
» I've already checked that the pipe is
still available at ACA.
[2:16:30]
» Great.
>> They'll deliver it and we just have to
[2:16:32]
install it as soon as we get the permit.
>> That's awesome.
[2:16:35]
» That's something that could happen
later, you know, even in October as long
[2:16:38]
as it doesn't freeze up.
>> Yeah. And it's just we've been trying to
[2:16:42]
make it happen so that the college the
construction comes in the first semester
[2:16:48]
» can help work on that.
>> Yeah.
[2:16:49]
» Right.
>> That's great.
[2:16:51]
» That would be great. That would just
that would be so awesome.
[2:16:55]
» I met with Ben about it last week and
updated him on the
[2:17:01]
» Thanks y'all.
>> And the permit. We just don't know when
[2:17:04]
when
>> Yeah. Then he'll go.
[2:17:08]
» We'll just wait. Okay.
>> I mean, could we ask a
[2:17:13]
representative or senator to check in on
that and push it along?
[2:17:18]
» Yeah. Do you have any relationships
you'd like to
[2:17:22]
» Yeah. I mean, Britney Patterson's up
here all the time.
[2:17:24]
» They're constantly like, "What can we
do? How can we help everybody?"
[2:17:27]
» Yeah.
>> Um,
[2:17:31]
who's it with? Who's the the Army Corp
of Engineers is with the
[2:17:35]
the State Department? No,
>> it's
[2:17:38]
» Army.
>> No, I know the state. Sorry. Which
[2:17:41]
department in the federal government?
>> Department of Defense.
[2:17:44]
» Yeah,
>> I was close, y'all. State Department's
[2:17:47]
pretty close.
>> Department of Defense.
[2:17:50]
» Isn't that the Department of War?
>> Yeah.
[2:17:52]
» Absolutely not. Absolutely not.
>> Something like that.
[2:17:56]
» Department
offices in Canyon City.
[2:18:00]
» Oh, really?
>> Yeah. They have like one person, one to
[2:18:04]
two people that work there. That's why
it takes so long to go through all the
[2:18:08]
permitting.
>> It's really capacity issues. It's hard.
[2:18:12]
» We have to work with them all the time.
>> They're just under a lot of capacity
[2:18:17]
constraints.
>> Oh, I think that's a great idea to reach
[2:18:21]
out to Britney.
>> Yeah, I was going to ask Bennett.
[2:18:26]
» Oh, Michael Bennett.
>> Just cuz Delaney is up there. Okay,
[2:18:29]
whoever. Does it matter who I ask?
>> Doesn't ask them all. Can you send me
[2:18:33]
the permit number so I can be really
explicit?
[2:18:38]
» They go around.
>> Great idea, Elsa.
[2:18:41]
» Also, maybe it would impel him to like
get more funding to that department,
[2:18:47]
too, you know. Okay, cool. If you could
get me the permit number, I'll reach
[2:18:52]
out.
Thank you.
[2:18:58]
And I'll cite our seasonal
trickiness
[2:19:03]
» and how the timeline
>> our time. Yeah. Snow makes us
[2:19:08]
» months of three construction months a
year.
[2:19:10]
» Yeah.
>> And hopefully that's true this year. I
[2:19:13]
don't want to say that, but hopefully we
get more snow this year.
[2:19:17]
It could also be helpful to site the
partnership between CMC because we're
[2:19:21]
intending to do the cowork installation
but then we have like a whole student
[2:19:25]
program it's going to help up the dirt
work so on workforce development
[2:19:31]
» on it.
>> Brilliant.
[2:19:34]
» Thank you Elsa.
[2:19:38]
» All right keep your head up bridge.
>> Oh yeah.
[2:19:42]
This is right.
>> Thanks and w
[2:19:46]
can't imagine miles.
>> I don't I don't I don't question it at
[2:19:51]
all because I almost get rear ended
every time I go to check con.
[2:19:56]
» I don't either. It's right outside of
Safeway. I think it was probably a
[2:19:59]
sheriff's truck. I've been in an
emergency but between the stoplight on
[2:20:06]
the highway and Harrison Avenue, they
were going to
[2:20:12]
That's scary.
[2:20:17]
» We have 10 minutes before the next topic
if
[2:20:20]
» Yeah. Should we take a little uh
>> point of privilege?
[2:20:23]
» Great. That's great.
[2:20:30]
» All right. We'll be back at 1:30.
>> Thank you, staff.
[2:20:43]
Shall we continue?
>> Item number two,
[2:20:48]
overview and discussion regarding the
Lake County Gateway Mobility Plan. This
[2:20:52]
will be led by Ann Schneider, our
community planning and development
[2:20:55]
director.
>> Thank you so much. Um so in the packet
[2:21:00]
of information that we provided you this
is kind of a legacy project um that was
[2:21:05]
championed by um the previous board of
county commissioners Jeff Beer. So, you
[2:21:10]
know, we've actually invited Jeff in to
kind of just educate us on kind of what
[2:21:15]
the thoughts were that informed applying
for this grant and, you know, largely it
[2:21:21]
was um wanted to be utilized and
leveraged to be able to kind of have a
[2:21:26]
seat at the table um and be competitive
to get our projects in line with COT. Um
[2:21:33]
uh Jeff mentioned noticing that um a
substantial amount of planning work
[2:21:38]
needs to be done in order to be
competitive um for range planning um
[2:21:45]
with CDOT. And so, um, in applying the
for the grant, we were awarded roughly
[2:21:50]
just a little over $933,000
to do this this planning work, um,
[2:21:56]
that's really been focused on safety and
mobility, some um, traffic calming in
[2:22:03]
um, our gateway areas both at the
intersection of 91 and 24, as well as
[2:22:07]
extending down into our busiest county
intersection at County Road um, 17 and
[2:22:14]
Popular. um looking at um kind of
connecting um increasing safety and
[2:22:21]
connecting our communities um in the
Mountain Valley estates east and west
[2:22:26]
and then looking at our um southern
entrance into the community at McQuey
[2:22:31]
and um Highway 24 South as well as um
the potential there was kind of an
[2:22:40]
add-on and we've had a lot of discussion
for several years about funding and
[2:22:46]
creating a bypass road to take off the
pressures of our downtown main street
[2:22:52]
area and just all of the associated
safety concerns that we have in that
[2:22:56]
area. So this study also looked at the
possibility of looking at um adding that
[2:23:03]
connectivity in different locations in
and around um the county and the city of
[2:23:09]
where could we potentially uh create a
effective bypass. Um so that just kind
[2:23:15]
of leads into a little bit of the
history and why. So, we're at a point
[2:23:20]
that uh we've engaged with uh DJNA as
our consultant to our traffic experts
[2:23:26]
and Bill uh Delo is here with us today
um to just present to you the outcome of
[2:23:33]
the feasibility study that was
contracted. Um once we get through that
[2:23:38]
presentation um with Bill leading that
we're going to talk a little bit about
[2:23:42]
we have a surplus of funds left actually
a considerable amount of surplus of
[2:23:47]
funds left um that we can utilize then
to go into um what we've got proposed is
[2:23:54]
is uh some future um uh work that would
make us even more competitive that we're
[2:24:00]
hopeful in um contending for being in
the running to get on C do DOT schedule
[2:24:06]
for these improvements um within our
community. So, we're going to talk about
[2:24:10]
that. We'll jump back in. Um but unless
you have any questions for staff, I'd
[2:24:16]
love to turn it over to Bill and let him
walk us through the um outcome of the
[2:24:22]
feasibility study thus far.
>> Yeah. Um this is also part funded by
[2:24:30]
GPR. So, that's very important thing to
get in front of them. Um funding is
[2:24:36]
planning to move forward with
implementation. So we are see to
[2:24:44]
move this forward.
>> Right. And um I think that Mark talked
[2:24:48]
about this with you when he did
that's joining us now. You know just
[2:24:52]
we've been working um with him to just
kind of understand the history of the
[2:24:58]
work and and where we're at and and kind
of next steps. So we'll be sharing that
[2:25:02]
afterwards. So, thank you, Michael, for
that and bringing that kind of into the
[2:25:07]
equation.
[2:25:11]
» Welcome, guys.
Go ahead, whoever's first.
[2:25:17]
» Great. Thank you. Yes, as Ann mentioned,
Bill DLO with DJNA and I'll be walking
[2:25:22]
through a presentation here shortly that
provides an overview of the planning
[2:25:26]
work we've done to date on the gateways
mobility study. Um, with me today I have
[2:25:31]
Mike Dagler who's also with DJNA. He was
our lead engineer um on the project and
[2:25:36]
so he'll be here and available to help
me answer any questions that you might
[2:25:40]
have um after we present. I do need to
get um permission to share my
[2:25:47]
presentation.
>> Okay.
[2:25:50]
» Absolutely.
>> Yeah.
[2:25:55]
» Okay. You should have permission.
>> All right.
[2:26:05]
Okay.
So, yes, once again, thanks um for the
[2:26:10]
opportunity to be here today and present
uh on the gateways mobility plan. uh
[2:26:16]
really happy to share the uh the work
that we've been doing uh on this project
[2:26:20]
with you all and talk a little bit about
the the recommendations and then that'll
[2:26:24]
certainly set the stage more for Ann and
team to talk a bit more about the
[2:26:29]
potential next steps on the project.
So start off provide an overview of the
[2:26:35]
study objectives. There were three
primary objectives um as part of this
[2:26:39]
study. first was identifying uh
potential multimodal improvements that
[2:26:43]
would serve uh users of all ages uh and
abilities and we focus in as Ann
[2:26:49]
mentioned and we'll walk through in the
presentation three areas um within the
[2:26:54]
county and within the city of Leadville
um as uh particular um locations of need
[2:26:59]
u where we really focused our study
efforts. We evaluated and uh then
[2:27:04]
recommended different alternatives for
each one of these locations really to
[2:27:08]
address the needs that were identified
through our technical analysis as well
[2:27:13]
as the needs that were identified uh by
the community through the engagement
[2:27:18]
effort uh that we undertook as part of
this process. And we up to this date
[2:27:23]
have prepared uh very conceptual level
uh diagrams for the preferred
[2:27:28]
alternatives in each location. and we'll
be walking through um each of those um
[2:27:33]
preferred concepts here within the
presentation.
[2:27:37]
So, as we mentioned, there were four
distinct uh focus areas for this study.
[2:27:42]
Uh first was up in Mountain View Village
northwest of town uh in that location.
[2:27:48]
We'll walk through some of the
challenges in in that area, but the
[2:27:51]
community is biseected by US 24. So it
creates challenges in terms of uh being
[2:27:56]
able to uh cross the highway to get from
one part of the community to the other
[2:28:01]
and being able to do so in a in a safe
manner. Uh we also looked at the
[2:28:06]
northern gateway area. This is the area
around Safeway and then as US 24
[2:28:10]
continues up to the intersection uh with
Highway 91. Third, we looked at the
[2:28:17]
Colorado Mountain College area,
specifically the intersection of US 24
[2:28:21]
with College Road and McQuei. Uh, this
is a location where there's an existing
[2:28:26]
crosswalk, uh, rapid flashing beacon.
Uh, but there's still challenges with
[2:28:30]
people being able to cross the highway
safely. Uh, we do, um, and heard through
[2:28:35]
the community engagement observations
around um, high traffic speeds along US
[2:28:40]
24 in this location. uh and there are a
lot of challenges with the sanitation
[2:28:44]
district dump station located near the
intersection and queuing that's
[2:28:47]
generated uh by that facility. And then
as Ann noted, the the fourth component
[2:28:52]
of this study was uh taking an initial
look and evaluating the potential
[2:28:57]
feasibility for uh an alternative truck
bypass route that would help to reduce
[2:29:02]
uh truck volumes through downtown.
[2:29:07]
So, starting off in the Mountain View
Village area, uh walk through each of
[2:29:12]
the the four project areas. We'll talk a
little bit about existing conditions in
[2:29:16]
each location and then the uh potential
recommendations uh for each location
[2:29:20]
after that. So, with Mountain View
Village, as I mentioned earlier, US 24
[2:29:25]
bisects the community. So, you have
about half the twothirds of the
[2:29:29]
community on the west side of the
highway and another third of it on the
[2:29:32]
east side. there's no uh designated p
pedestrian crossing uh across the
[2:29:37]
highway. So uh residents if they want to
get from one side of the community to
[2:29:42]
the other are kind of on their own for
crossing the highway where wherever they
[2:29:45]
may want to. Uh and as you can see from
the exhibit, there's a a pretty good
[2:29:50]
curve in the highway that limits
visibility both for drivers and
[2:29:53]
pedestrians. Uh so it doesn't make that
crossing of the highway um very easy or
[2:29:58]
very safe. Additionally, one item that
was highlighted through the engagement
[2:30:02]
and through our analysis is there's a
fair number of people who would like to
[2:30:06]
be able to walk or bike into town and
there's no existing facilities along uh
[2:30:11]
highway 24 to make that connection. So,
a lot of people currently today walk in
[2:30:16]
the uh the shoulder of the highway in
the dirt adjacent to the pavement.
[2:30:24]
So, we looked at several different
options for this location in terms of
[2:30:27]
being able to address the uh the
crossing with pedestrians. Um reviewed
[2:30:32]
these options as well um with C dot just
for an initial kind of gut reaction uh
[2:30:38]
to the potential for different um
improvements. So, I'll walk through them
[2:30:41]
and talk about what some of the uh the
potential next steps would be here. So,
[2:30:46]
the first item that we looked at or
first option that we looked at was would
[2:30:49]
be an atgrade crossing. So, this would
end up having a marked crosswalk that
[2:30:55]
would connect uh the two sides of the
community together, which we've shown
[2:30:59]
here in about the middle of the exhibit.
Uh this crosswalk, you know, in and of
[2:31:04]
itself can exist on it own its own. It
needs some sort of um protection,
[2:31:09]
traffic control of some sort given the
volumes on the highway and the uh the
[2:31:13]
speed of traffic. So, we've identified
that that crosswalk could either be
[2:31:18]
controlled by a um rapid flashing
beacon, which is similar to what is in
[2:31:23]
place along US 24 down by Colorado
Mountain College today, or what's called
[2:31:28]
a pedestrian hybrid beacon, which is the
the overhead lights that turn uh solid
[2:31:33]
red and then flashing red uh when
pedestrians are are crossing uh a
[2:31:38]
particular crosswalk in the
intersection. So we've talked about uh
[2:31:42]
those different treatments with C dot a
few of the items that they highlighted
[2:31:46]
um for these to be feasible. One would
be um changing and kind of communicating
[2:31:50]
a bit of a change in the uh the highway
environment. So having drivers expect
[2:31:55]
that there might be pedestrians in this
location. So, also on this exhibit,
[2:31:59]
you'll see we've shown locations in
orange here for new sidewalks. Um, in
[2:32:04]
kind of the pink or purple color here in
the the middle where we would have a new
[2:32:08]
median, raised median that would be
present in the highway and then a
[2:32:12]
sidewalk on the uh the east side of the
highway as well to communicate to
[2:32:17]
drivers hopefully slow traffic as well
uh but to anticipate that there may be
[2:32:22]
uh pedestrians and then that crossing
device may be activated. In addition to
[2:32:27]
those treatments in those locations, we
also have proposed in this concept uh
[2:32:31]
fencing along the south side of the
highway to direct pedestrians to cross
[2:32:36]
at the crosswalk so that they utilize
that infrastructure u for the purpose
[2:32:40]
that it was implemented for. Uh and then
additional signing both um westbound and
[2:32:45]
eastbound on Highway 24 in advance of
the crossing to alert drivers to the
[2:32:50]
presence of the crossing. uh and then
also to activate ahead of time those
[2:32:54]
signs, those warning signs when there's
a pedestrian in the crosswalk. So that's
[2:33:00]
option one really identified as a lower
cost and nearer term uh improvement.
[2:33:06]
Option two for this location was uh
identified as the potential for an
[2:33:11]
underpass under US 24. So here on the
east side of the community, the the
[2:33:16]
highway starts to generally and
gradually go up in elevation and so
[2:33:21]
there's opportunity to potentially put
in an underpass underneath the highway
[2:33:25]
using kind of the the natural grade of
the terrain in this location. Uh and
[2:33:30]
then we would have a grade separated or
separated pedestrian crossing under the
[2:33:35]
highway to be able to connect uh the two
communities together. Within the plan,
[2:33:39]
we identified this uh undercrossing. You
know, certainly acknowledged it as a
[2:33:44]
more expensive option and something that
could be uh analyze potentially more as
[2:33:49]
a long-term improvement for this
location.
[2:33:54]
And then the uh the other item that I'll
identify here in terms of
[2:33:57]
recommendations is down here in the
green is a new multi-use path that would
[2:34:02]
connect the uh Mountain View Village
down to the northern gateway area. And
[2:34:07]
as we go through a few slides um here
further into the presentation we'll
[2:34:12]
provide a little bit more detail but we
are showing the uh the connection for
[2:34:15]
that and then both options both the uh
at grade crossing with the sidewalks or
[2:34:21]
the underpass would then connect both
sides of the community to that that
[2:34:25]
multi-use pathway.
[2:34:30]
Right. So then we jump down to the
northern gateway areas. We mentioned
[2:34:34]
this area covers um the area here um
Mountain View Drive by the Safeway
[2:34:40]
» up along US 24.
>> Okay, just
[2:34:43]
» I will die. Thank you.
>> Sorry. All right.
[2:34:47]
» No, no problem. Um and then up here to
the intersection uh with Highway 91
[2:34:53]
within the uh the concepts and as we
walk through these other concepts um C
[2:34:57]
DOT did share the concept plan for the
roundabout at that intersection of uh US
[2:35:03]
24 and Highway 91. And so we've
superimposed that initial concept um
[2:35:08]
onto our plans just so we can make sure
that we were planning with the the
[2:35:12]
ultimate configuration of that
intersection and didn't propose anything
[2:35:15]
that potentially conflicted with with C
do DOT's plan in that location. So, US
[2:35:21]
24 and the the intersections here today
are very autooriented uh very much
[2:35:26]
focused on serving automobile traffic,
but the uh character of this uh area
[2:35:31]
within town is changing quite a bit with
the railard development going to bring a
[2:35:35]
lot significant number of new residents
to this area, a lot more pedestrian and
[2:35:40]
bike activity. And so we focused uh our
recommendations and concepts around
[2:35:46]
serving those uh additional uh
pedestrians and cyclists that will be
[2:35:50]
coming with the new development. We also
um spent some focused time on the
[2:35:55]
existing bus stop that's currently
located um kind of within the uh the
[2:35:59]
drive aisle or parking lot for the uh
Safeway and looking at ways to enhance
[2:36:04]
that bus stop, relocate it and put in a
location that where more amenities could
[2:36:09]
be provided for riders and it would be
uh more accessible for uh individuals
[2:36:14]
especially from the intersection of
Mountain View Drive and US 24.
[2:36:20]
So, this slide shows uh some of the
proposed improvements. We have the in
[2:36:24]
green here, the multi-use path
connecting in from the the south side of
[2:36:28]
US 24 in Mountain View Village. There is
an existing sidewalk along the west side
[2:36:33]
of the roadway here um which we have
identified could potentially be widened
[2:36:38]
um to the full width of a multi-use path
at least 10 feet wide to provide for
[2:36:42]
two-way traffic for cyclists and
pedestrians. We then identified a series
[2:36:47]
of improvements at the intersection,
mostly focused on enhancing the existing
[2:36:51]
crosswalks, either adding additional
crosswalks or refreshing the striping on
[2:36:55]
those crosswalks, uh, and making sure
that the, uh, pedestrians who are
[2:37:00]
crossing at the intersection there can
do so in a safe and convenient manner.
[2:37:05]
We looked at several different potential
locations to relocate the existing bus
[2:37:09]
stop based upon uh available space
within the uh the roadway, available
[2:37:15]
rideway and where the uh the buses are
heading. And then down here at the south
[2:37:20]
end, we propose continuing that
multi-use trail along the uh the east
[2:37:25]
side of the roadway so that it's able to
serve the railard development and
[2:37:29]
ultimately connect to the mineral belt
trail to the south.
[2:37:34]
And then here on this slide, we show the
uh full connection, full extent of the
[2:37:39]
proposed multi-use trail between the
Northern Gateway uh and Mountain View
[2:37:44]
Village. This trail is proposed to be
located on the south side of US 24 would
[2:37:49]
be about two and a quarter miles uh in
length uh and would
[2:37:56]
here we've shown down here a transition
where it would stay on the south and
[2:38:00]
west side of the roadway where the
roundabout is developed some different
[2:38:04]
concepts to ensure that there's the
ability for uh pedestrians and cyclists
[2:38:09]
to cross on the west leg of the
intersection and be able to access uh
[2:38:13]
Mountain Valley Estates and other
properties here uh to the north of US 24
[2:38:18]
on the west side of Highway 91 as well.
[2:38:25]
Then also wanted to touch on the uh the
concept for the uh the bus stop. So
[2:38:29]
we've shown that here uh a potential
proposed concept. So, the existing bus
[2:38:34]
bus stop is up here in the uh upper
leftand corner of this image where
[2:38:38]
there's an existing uh power pole in the
uh the middle of the uh entrance to the
[2:38:44]
parking lot and the bus stop is signed
um by this power pole. In this concept,
[2:38:49]
we've proposed extending the existing
sidewalk from the intersection on the
[2:38:53]
north side of Mountain View Drive,
creating a bus pull out and a full bus
[2:38:59]
stop along the sidewalk, which could
include benches, a shelter as well, um,
[2:39:03]
if desired, and a more convenient and
safer waiting space um, for bus
[2:39:09]
passengers that's outside of the uh, the
drive aisle and traffic operations
[2:39:14]
within the uh, the Safeway parking lot.
We also show the u refreshed and new
[2:39:19]
striping for the crosswalks here at the
intersection with US 24 and mountain
[2:39:23]
view as well on this exhibit.
So I'll jump now down to the third
[2:39:29]
location, Colorado Mountain College. So
we focused in this location primarily on
[2:39:34]
the intersection here, McQuey College
Road and US 24. As mentioned, there is
[2:39:39]
the existing crosswalk that is uh
controlled by a rapid flashing beacon
[2:39:43]
here on the west side of the
intersection. Uh but traffic is free
[2:39:47]
flowing along US 24. The speed limit in
this location is along the highway is 35
[2:39:52]
miles per hour, but certainly in field
reviews we've done, what we've heard
[2:39:56]
from the community is a fair amount of
traffic does seem to travel at a higher
[2:40:01]
speed in this location, especially in
the uh the west or southbound direction.
[2:40:05]
As people are heading out of town, the
roadway starts to kind of go down in
[2:40:10]
elevation as you start to go out of
town. And so people start to pick up
[2:40:13]
speed as they're uh moving out of
downtown and moving um to the south.
[2:40:19]
There are a few other items that we
wanted to uh to point out uh with this
[2:40:23]
is the uh mineral belt trail here
crosses US 24 here to the west, but
[2:40:27]
there's no marked uh crossing in this
location. Uh so it's a midblock crossing
[2:40:32]
that uh is not marked. Um, ideally folks
would travel up and make this crossing
[2:40:37]
here where the beacon controls it, but
it takes folks quite a bit out of their
[2:40:42]
way. There isn't necessarily a sidewalk
along the highway, so there's not a lot
[2:40:46]
of compliance with that um movement and
and making that diversion. And then, as
[2:40:51]
we mentioned, the existing dump station
here with the sanitation district
[2:40:55]
located right just adjacent to the
roadway. Um, really enough room for one
[2:41:00]
vehicle, one vehicle with a trailer or
an RV. uh and that tends to cause uh
[2:41:04]
queuing either onto US 24 or over here
on Quincy Street east.
[2:41:11]
So there were two options and two uh
alternatives that we identified as
[2:41:15]
potentials uh for this location. The
first would be to signalize the
[2:41:19]
intersection of US 24 College of Mathy,
add full crosswalks in that location uh
[2:41:25]
as well. And then as part of both
options, we propose to realign the
[2:41:31]
mineral belt trail uh to encourage and
direct users to cross at the
[2:41:37]
intersection. Within this concept here,
we've shown the uh the trail here along
[2:41:42]
the south side of US 24. There's also
the potential concept where the trail
[2:41:47]
could cross here to the south kind of at
the south end of the exhibit and connect
[2:41:51]
in with the trail that connects up to
the college and then directing users
[2:41:55]
here along the west side of college
road. That is an option where if we did
[2:41:59]
go to a greater level of design uh for
this concept, we could look at both of
[2:42:04]
those options in a bit more detail. We
then have shown in purple here just kind
[2:42:09]
of in general terms um the proposed
sanitation districts uh concept to
[2:42:14]
relocate uh their facilities and the
dump station to create uh more room for
[2:42:18]
queuing to happen off street.
So we also looked at the a concept with
[2:42:25]
a roundabout at this intersection and
within the plan this concept is the uh
[2:42:29]
identified or recommended preferred
alternative uh to implement a roundabout
[2:42:33]
in this location. uh same treatments as
before with the realignment of the
[2:42:38]
mineral belt trail. Uh the
implementation of the sanit sanitation
[2:42:42]
district's proposals for a a
reconfigured facility. Uh and then the
[2:42:46]
crossing for the trail on the west leg
of the intersection here. U we did talk
[2:42:52]
with COT at least in a preliminary basis
about the potential of the roundabout. I
[2:42:56]
think in general C dot was open to the
concept. There does need to be some
[2:43:00]
additional analysis to look at and
ensure that the roundabout would operate
[2:43:04]
appropriately given traffic conditions
and that it would be uh designed to
[2:43:08]
accommodate all of the different
vehicles in terms of trucks and
[2:43:11]
emergency vehicles in this location. But
at least as a general concept, um C do
[2:43:16]
was open to studying the concept uh
further in this location.
[2:43:23]
And then finally, I'll walk through uh
the examination we did with the uh the
[2:43:28]
truck bypass alternatives. Uh this
exhibit shows the various different
[2:43:32]
routes and alternatives that we looked
at. There were six in total. Uh so
[2:43:38]
starting here at the top in the dark
blue, uh we looked at an alternative
[2:43:41]
that used county road 99. um along with
additional roadways, County Road 9 here
[2:43:47]
uh down to the south connecting to
Highway 300 and then intersecting US 24
[2:43:52]
down here at the south with that
connection. So really kind of keeping uh
[2:43:56]
truck traffic as far west as possible um
of town. Uh the next option here is in
[2:44:03]
the pink um which utilizes a very
similar alignment up here along County
[2:44:07]
Road 5A and then County Road 9 and then
cuts across on Mountain View Drive um
[2:44:13]
over to where the Safeway in Northern
Gateway area is to reconnect with US 24.
[2:44:18]
There's then the uh the green route
which again follows County Road 5 and
[2:44:23]
then follows County Road 4 uh east
across town and then makes that
[2:44:28]
connection in the Northern Gateway. Then
in the dark green, we use uh an
[2:44:32]
alternative that uses McQuey uh and then
makes the connection um up and avoiding
[2:44:38]
downtown. And then in the red is the
current alignment along US 24. And then
[2:44:43]
over here, the final option here in
purple um utilizes US 24 till just south
[2:44:49]
of downtown and then cuts across to the
east on County Road 8. um avoiding
[2:44:54]
downtown but still running through
generally um the center of town uh to
[2:44:59]
make that connection. Here we have shown
in blue um a location where there isn't
[2:45:05]
an existing roadway but there could
potentially be um a future roadway that
[2:45:10]
we discussed with public works at least
at a high level. Um so we've shown that
[2:45:14]
at a as a dash line here that could make
that connection and avoid um some of the
[2:45:20]
constraints that are present here along
County Road 5.
[2:45:24]
So a few items that we wanted to point
out with the truck bypass alternatives.
[2:45:28]
Um certainly as Ann mentioned, you know,
trucks today cause uh quite a bit of
[2:45:32]
impact within downtown. Based upon se
dot traffic data, there's about 400
[2:45:37]
heavy trucks on average a day that pass
through downtown along US 24. that's
[2:45:42]
projected to grow to about 450 trucks
per day by 2040. So in the next 14 15
[2:45:48]
years. Um but as we looked at these
different alternatives, all six of them,
[2:45:53]
they all have different constraints and
in some cases very significant
[2:45:56]
constraints. There's narrow travel
lanes, narrow roadways. Um there's no
[2:46:01]
shoulders along many of the roadways. uh
many of the roadways the pavement
[2:46:05]
condition the pavement cross-section is
not set up to have significant amounts
[2:46:09]
of heavy truck traffic uh travel along
those roadways. So just from a a
[2:46:15]
physical condition standpoint uh pretty
much all of the uh options that we
[2:46:20]
looked at would need significant
improvements um to the roadway to the
[2:46:24]
roadway shoulders the width of the
roadway and the pavement cross-section
[2:46:27]
in order to be able to accommodate
increased uh truck traffic. Another key
[2:46:32]
item, especially on the far west side
along County Road 5, are the existing
[2:46:37]
bridges. They're not designed to
accommodate uh heavy volumes of trucks
[2:46:41]
and heavy trucks with that. And so
there's uh significant either retrofit
[2:46:45]
or replacement of those bridges that
would be required uh to be able to serve
[2:46:50]
uh truck traffic. There's also on the
west side uh very significant potential
[2:46:55]
wetland and wildlife habitat impacts. Um
you're getting outside of town into
[2:46:59]
areas where there are existing wetlands.
there's a significant number of wildlife
[2:47:03]
crossings that occur and so there's a a
good chance or a significant chance of
[2:47:08]
potential conflicts with truck traffic
um and wildlife as well. Many of those
[2:47:14]
alternatives also uh travel through
heavily residential areas within the
[2:47:18]
county and within the town. And so there
are sign potentially significant um
[2:47:23]
impacts related to to noise um with uh
trucks traveling so close to uh
[2:47:29]
residential properties as well.
We did look um at a very high level
[2:47:34]
based upon some of those alternatives or
those issues at the county road 9 or
[2:47:39]
sorry county road 99 alternative which
is this uh dark blue line here. Uh and
[2:47:44]
it based upon looking at those
constraints, the potential upgrades that
[2:47:48]
might be needed could be anywhere from
25 to $60 million to be able to make
[2:47:53]
that um alternative and that route um
acceptable uh as a truck route in terms
[2:47:58]
of roadway width, pavement
cross-section, and mitigating um other
[2:48:02]
potential impacts as well. We would
expect the the other options that we
[2:48:06]
looked at and the other routes that we
looked at to have pretty similar cost
[2:48:09]
ranges um as well. So, it's a pretty
significant um investment if it was
[2:48:14]
something that would be uh pursued
further.
[2:48:18]
And uh with that, I'll turn things over
back to to Ann to talk about a little
[2:48:22]
bit of the uh potential next steps.
>> Thanks. And and I um also love to just
[2:48:30]
kind of um take a break and see if the
commissioners have any questions. There
[2:48:37]
was a lot of information. Um these next
steps are some um potential ways that we
[2:48:43]
can continue to utilize um the funds um
that are in the grant. This is does have
[2:48:48]
a 25% match. Um and so we just want to
kind of get an idea if you have that was
[2:48:55]
a a lot of information. So seems like a
natural place to take pause and see if
[2:48:59]
you have anything about what you've
heard thus far.
[2:49:04]
» So the grant was over 900,000.
How much have we used so far?
[2:49:09]
» So we've used just under 200,000 I
believe of that. So in in in just broad
[2:49:16]
and I know Catherine's here is that what
we
[2:49:20]
» Yes.
>> Well I I think the total is that we've
[2:49:23]
used
[2:49:29]
» so we we've got five surplus um to be
used in this planning. And so that's
[2:49:35]
what we're going to talk about next.
Also just to clarify the grant itself
[2:49:39]
like grant funding is 700,000.
It's the the 9333
[2:49:47]
is is the total project cost
>> with the match.
[2:49:51]
» Yeah. So the 25% match that we're
committed to if we use up all of that
[2:49:56]
funding is 233
[2:50:00]
um total. But so far we have only spent
like
[2:50:07]
the 333 part of the um match commitment.
>> So if we continued if we used up all of
[2:50:14]
the rest of the grant funding, we would
be committed to not quite 200 grand.
[2:50:24]
» So the grant is a planning grant. It's
not a construction grant. Correct. So,
[2:50:29]
so some of these next steps would be um
taking um those three study areas um
[2:50:36]
Mountain View Village, Northern Gateway,
and um Con Mountain College, taking them
[2:50:41]
to a 30% design
um and evaluating them in more detail.
[2:50:47]
Um and so this just kind of goes through
all of the future work that can be done
[2:50:51]
on those areas. the um early estimates
on this work on these three different
[2:50:58]
stere uh study area areas would be
roughly $200,000
[2:51:02]
um to look at at those and then um Oh
yeah,
[2:51:08]
Mark has a question.
>> Mark from COT, you want to jump in
[2:51:12]
there?
>> Sure. And I appreciate the commissioners
[2:51:17]
uh allowing me in on this one.
I just I'm a little confused. So, are we
[2:51:25]
finishing
what's being presented and talking about
[2:51:28]
that before we move on or what do we
what what is the effort here? because I
[2:51:36]
feel like we jumped from one to to
really talking about finishing this this
[2:51:42]
section because honestly my concern my
one of my main concerns for joining
[2:51:47]
today is making sure that the contract
Lake County has with DJNA
[2:51:56]
is completed is have they are they doing
everything they're being asked is this
[2:52:02]
because when I looked at the RFP I never
saw the contract and this was couple two
[2:52:07]
three years ago when it was pushed
forward. Um I'm not sure what your
[2:52:13]
contract with DJNA is and if this
completes it and so if this does then
[2:52:19]
this needs to be tied up and and
finished and and then we can talk about
[2:52:24]
potential next steps. Um because unless
they're contracted to move on and I'm
[2:52:30]
not sure that they are. So, can we clear
that up with me real quick? What is is
[2:52:37]
this the end of their contract?
And I don't know if they need to kind of
[2:52:42]
I mean, if they if they need to finish
and if we want to finish discussing what
[2:52:46]
they have presented cuz they still need
to like put a bow on this and present it
[2:52:51]
and seed needs to get the documentation.
And there's a few things I wanted to
[2:52:55]
talk about their presentation before we
jump to the next steps. But I mean I
[2:53:00]
I'll follow along. I just wanted to
raise that concern.
[2:53:05]
» Thank you, Mark.
>> Yeah, thank you so much, Mark. And I
[2:53:08]
think I think you're absolutely right. I
think it's um you know, time to take a
[2:53:13]
bit of a pause and look at the
information that's in front of you. And
[2:53:17]
I think that we have um spent some time
trying to kind of research what the
[2:53:23]
original RFP um in included and um
perhaps Bill, you can help us uh with
[2:53:30]
this as well. I think that this would be
um and I think that Mark, we all met
[2:53:37]
with you um and public works and DJNA
together to try to kind of sus that out.
[2:53:44]
So, I'd love to hear um maybe from your
perspective, Mark, as well as um bills,
[2:53:50]
if um where we're at right now. Um and
kind of fine-tuning this plan with input
[2:53:58]
back from the board on direction. Um it
would be all inclusive of what the RFP
[2:54:06]
was designed to do. So that's kind of
been our intent mark from you know
[2:54:11]
staff's intent from kind of taking on
this project as a legacy piece from uh
[2:54:17]
previous leadership.
[2:54:23]
» Who can shed light on this RFP and what
it entails and is it coming to an end?
[2:54:28]
Bill, can you help us with that? Yeah, I
would note um I think for for our scope
[2:54:33]
of work that we have contracted with the
county uh the plan the draft plan that
[2:54:38]
we presented here today was the primary
in deliverable um for that um scope of
[2:54:44]
work. Uh so obviously any comments that
you all have here today um comments that
[2:54:51]
may come from Mark or from C dot uh we
would have still a process we still have
[2:54:56]
within our current scope of work um the
kind of addressing those comments making
[2:55:02]
any updates to the documents to reflect
those and then finalizing that document
[2:55:07]
and submitting it uh to the county. So,
as part of our base scope, it was
[2:55:11]
preparing this plan and the uh concept
level uh designs that we have and that
[2:55:16]
we've provided to the county. Um, but
our current scope did not include
[2:55:21]
advancing anything further in design up
to maybe a 30% level or something.
[2:55:26]
» All right, then that is that is exactly
what I wanted to hear. Thank you, Bill,
[2:55:30]
for doing that. So then let's back up a
little bit and talk just if it's okay
[2:55:35]
with the the county commissioners. Let's
talk about this and let's focus in on
[2:55:42]
completing what Bill and DJNA has done
and put in some comments on that. That
[2:55:48]
way they can kind of
get wrapped up. So, if you'll go back to
[2:55:53]
at least I had a couple of questions
specifically of the trail along State
[2:55:58]
Highway 22 24. Um,
yeah, there was the one that showed it
[2:56:04]
all the way around. So, yeah. Yeah.
Okay. So, that is a really long trail
[2:56:10]
and it looks like it flows all along Cot
right away. I just want to give Lake
[2:56:15]
County a heads up that there's we're
getting a lot of these requests now from
[2:56:20]
mountain communities where the road is
really tight. Our maintenance forces
[2:56:25]
have a huge safety concern when it comes
to these type of things. One, we're not
[2:56:31]
even sure how much rightway we really
have there. A lot of times when you're
[2:56:35]
coming through these mountain easements,
it is mostly Forest Service e easement
[2:56:40]
and the rightway can get really really
expensive just letting and this is just
[2:56:44]
as an FYI. Um, also for safety concerns
in the winter when we have when we have
[2:56:51]
snow, and I hope we do have snow, that
when the plows come through, I mean, if
[2:56:58]
you look at the Glenwood Trail, the
Glenwood Canyon Trail, we close that
[2:57:03]
about 6 months out of the year just
because plow drivers along, they can't
[2:57:08]
be checking to to make sure people are
along there. and those rooster tails
[2:57:12]
coming off the plow. And a lot of times
go, "Oh, this is a great little uh cross
[2:57:17]
country ski trail, blah blah blah. We
can use this year round." This gets
[2:57:21]
become really
a safety issue for our plow drivers
[2:57:25]
because again, you just you never know
exactly what's going to be coming and
[2:57:31]
and what the weather is and on and on.
We're having these issues even down in
[2:57:35]
Grand Junction and Mesa County where
that we have the trail alongside the
[2:57:40]
interstate and we can those rooster
tails can get thrown off pretty far into
[2:57:45]
those bike trails. So just just be aware
this looks simple but not always. One of
[2:57:52]
the other things when I was looking at
this is it can kind of come off right
[2:57:57]
there at 99 and back around the backside
into town where there's less traffic.
[2:58:02]
But anyway, that's something that can be
looked at down the road. I don't know if
[2:58:05]
that was even considered, but that's
just one of the comments I wanted to
[2:58:10]
make because our maintenance forces are
getting these requests and it's getting
[2:58:15]
getting kind of touchy on that note. Um,
also when it comes to bypasses, I would
[2:58:22]
strongly encourage Lake County and
Leadville to visit with Delta, the city
[2:58:28]
of Delta and the city of Montro. They've
done some bypasses that have been fairly
[2:58:34]
successful. They've had some Delta, the
city of Delta especially has had a
[2:58:38]
little bit of trial on that.
Excellent opportunity for you guys to
[2:58:42]
communicate with them and kind of get a
feel on what's worked, what hasn't, and
[2:58:47]
what's still kind of working. Montro
worked really well. And in fact, what
[2:58:52]
they ended up doing, they ended up
devolving the downtown. they're take
[2:58:57]
they took over the downtown and we took
over the side street that became the
[2:59:01]
bypass and again there's there's
potential along those those lines that
[2:59:06]
really can be beneficial to the city of
Leadville. Um and so definitely
[2:59:13]
encourage you to talk to and communicate
with Leadville on that that effort. Um,
[2:59:19]
also if you do go down those roads, you
might want to look at state highway 13
[2:59:27]
as it bypasses Rifle, not goes through
the town of Rifle, but bypasses
[2:59:33]
they do. When we put that in, we
protected that um with some zoning
[2:59:38]
because it is a three-way. We we spent
extra money to make that a three-way, so
[2:59:43]
the speed limits could be a little
higher. And when that was built, there
[2:59:48]
wasn't a building up around it. You
always want to protect that once you
[2:59:54]
spend the money to do something like
that. That way, you don't have to
[2:59:56]
continually cuz once you build a bypass,
businesses come, next thing you know,
[3:00:01]
other businesses, other things come and
then they want to slow it down. That's
[3:00:05]
not the purpose of a bypass or a
three-way. It's to get people or trucks
[3:00:10]
or whatever. And then just be aware that
that can cause its own
[3:00:16]
uh repro repro re repercussions
[3:00:23]
and that's really other than that I
think what you guys did was a great plan
[3:00:27]
layout. Um yeah highly compliment on on
the effort so far.
[3:00:36]
Mark, I like what you said about,
you know, doing a a trail 99 that would
[3:00:43]
actually connect to Leadville Junction,
which may be on the list for a trail
[3:00:49]
down uh
one of the county roads from town. So, I
[3:00:53]
I think that's smart.
>> It'd be a whole lot more scenic. I do
[3:00:57]
know that it'd be a little shorter, a
little less expensive as far as that.
[3:01:01]
And you know, maybe maybe a shorter
section trail along the state highway
[3:01:06]
would be more palatable. You know, you
look at some of those curves as you look
[3:01:11]
at this really long stretch.
It'd be in the shade a lot. It'd be
[3:01:17]
there's just a lot of struggle on that.
I think especially around those around
[3:01:22]
that hump. And so just just as an FYI, I
as I was looking at that on some other
[3:01:29]
things, I really like that dropping off
at 99 and going around. That's how I
[3:01:34]
would take a bike.
>> Is there another study studying the bike
[3:01:39]
path from town down to the lake?
>> Um, so I think that's part of what is
[3:01:44]
that the saber routes or is that going
to include that? I know that the trails
[3:01:48]
coalition folks were looking at that and
direct was granted
[3:01:52]
» a um grant to look at that um but we
have I I don't know what the status of
[3:01:58]
that is
[3:02:01]
right now to extend the trail that we
don't have right
[3:02:07]
» so the study area was four to nine over
that way to the north side of
[3:02:12]
» lake
[3:02:15]
and so that
Pros had um initiated that with the
[3:02:19]
trails coalition. They had worked um on
that and and we've been working with
[3:02:24]
them, but we've had a bit of turnover.
So, I'm not sure where that project
[3:02:28]
right now.
>> So, Bill and Mike, are you catching all
[3:02:33]
this? It doesn't seem feasible that
we're going to get a bike path on that
[3:02:36]
highway. It'd be better to take it 99 to
county road four and work with
[3:02:42]
» Yeah, that's what it sounds like. And I
think that's something, yeah, we could
[3:02:45]
certainly uh modify within the document,
modify this u this exhibit. Yeah. And
[3:02:50]
highlight those issues. Yeah. That Mark
identified with it.
[3:02:54]
» I think it's a good suggestion.
>> If we go to County Road 4, I just I just
[3:02:58]
got to point out that it seems like once
again all of Leadville North gets
[3:03:03]
circumvented by everything. There's, you
know, half a dozen neighborhoods out
[3:03:08]
here and the kids have no way to get
into town. They're stuck on the side of
[3:03:13]
Mountain View Road, which has no
shoulder, and people are constantly
[3:03:17]
trying to walk or bike up and down this
road. Um, you know, it's it just feels
[3:03:23]
like there's there's got to be at least
120 houses out here that have no way to
[3:03:27]
get into town. And from bus routes to
proposed paths or sidewalks, it seems
[3:03:33]
like everything in Leadville North
completely gets overlooked.
[3:03:38]
So, is that the Mountain Valley Estates
that you're looking at or the Mountain
[3:03:42]
View Village
>> that gets bypassed?
[3:03:46]
» No, everything's called Mountain View.
I'm talking about Mount Mountain
[3:03:49]
Mountain View Road, which is uh what are
we? County Road
[3:03:54]
» um
17.
[3:03:58]
Yes,
>> the the there is a path that stops at
[3:04:01]
Eagle's Nest,
>> but beyond that, you've got a whole
[3:04:05]
section of West Park um which almost
ties into the new developments over
[3:04:09]
there. You've got Turquoise Street,
you've got um Load Stone or Homestake,
[3:04:15]
you've got uh Gem Valley Estates, you've
got Silver Hills, you've got Four
[3:04:20]
Seasons.
>> Yeah. Okay. Oh, no. Go ahead. Continue.
[3:04:23]
I finally found a separate map to look
at that. So, yes,
[3:04:27]
» there there's a just a large amount of
houses out here. There's a lot of young
[3:04:31]
families. There's a lot of kids, and
they've got no way to get into town
[3:04:34]
except go through the woods, go through
the cemetery, or go up Mountain View,
[3:04:39]
which has no shoulder until you get just
about into town.
[3:04:44]
» Okay. So, on that note, just just as an
FYI, that's is that all Leadville proper
[3:04:49]
or is that in the county as well?
>> County.
[3:04:53]
» County.
Okay.
[3:04:56]
So again, in my coming off 99 from what
I'm seeing,
[3:05:01]
it would just and again I don't know if
it would tie into that Mountain View
[3:05:05]
Drive and then a bike path beyond that
Mountain View Drive
[3:05:09]
through the county. I don't know. I And
again, that then would tie in with that
[3:05:13]
Leadville North community and then bring
it into Leadville itself.
[3:05:20]
» Does that make sense what I'm saying?
>> Yeah. I just with the last discussion it
[3:05:26]
it sounded like, you know, oh, if we
don't do a bike path up 24 or a
[3:05:31]
pedestrian path, bring it in 99 and go
up uh go up County Road 4, you know, and
[3:05:36]
it's just County Road 4's already got a
gravel path going just about all the way
[3:05:41]
down it. It's already got something
people can use. Mountain View there. The
[3:05:46]
the Yeah. That that reddish one. Uh it
has nothing
[3:05:51]
» until you get to West Park like further
up like almost most the way to Safeway.
[3:05:57]
» Yeah. So, and what I was thinking when
you come off 99, if I were riding a bike
[3:06:01]
from the trailer from those uh Mountain
View Mountain View Village, I'd take 99
[3:06:08]
to get off the highway, come around and
then either jump on nine or 17 depending
[3:06:15]
on how big a hurry or how the scenic and
come around that way and around. I mean,
[3:06:20]
it's not You could look at that. I'm
just I'm just suggesting and and on and
[3:06:24]
on. We could look at that. that would
then take it off of that put it on the
[3:06:28]
county which may have a better or
different rightway take it through
[3:06:33]
communities and on and on and then it
would it would benefit through that
[3:06:37]
whole group and then you'd come out
mount drive around either Mount Massive
[3:06:42]
or Mount Elbert Drive right around town
and that First Baptist Church of
[3:06:47]
Leadville
[3:06:50]
» thanks Mark that's good input that's
>> to I mean, it's much more scenic. It's
[3:06:57]
It's And it may It's It's off the
highway. Again, I'm not This is
[3:07:03]
Leadville and Lake County's plan, and
I'm not sure where the town limits stop
[3:07:08]
and start, but again, I think that would
be something to look at down the road.
[3:07:14]
And then you control the speed limits.
You control all the all that all that
[3:07:19]
traffic through there.
>> Yeah, it's safer. seems much safer, too.
[3:07:27]
» Again, this is the spirit of this today
is to get feedback. So, we've been
[3:07:30]
working closely with Bill and we can
take this information back and come up
[3:07:35]
with some ideas and and bring those
back.
[3:07:38]
» So, just to be clear, is there another I
didn't catch that there's another study
[3:07:43]
about a bike path to connect for all the
way? So there is um there was a grant
[3:07:51]
that was obtained by recreation and that
was looking at connection between the
[3:07:57]
mineral belt trail um to county road 4
to have a safer route. And so like you
[3:08:05]
probably recall, we have entitlements
built into our trails that are built
[3:08:09]
into Mountain Gate subdivision, Timber
Ranch, Westwoods that would help to
[3:08:15]
create that connectivity to nine and
then looking at taking at 9 to the
[3:08:19]
junction.
>> So I think that the effort may have be
[3:08:24]
might be on hold a little bit. Mhm.
>> The biggest barrier with that was that,
[3:08:30]
excuse me, the grant amount is not
actually enough to cover the whole
[3:08:35]
feasibility study. And so that's kind of
where we're stuck. But thankfully, we
[3:08:40]
have some more time to figure out what
we want to do with that.
[3:08:46]
» Uh Pete, did you want to say something
quick? Yeah, I just wanted to point out
[3:08:49]
um in regards to the bike path along
County Road 99 that um when when that
[3:08:55]
subdivision was built, there was an
extra wide county rideway designated. I
[3:09:01]
don't remember how wide it is
specifically for a future bike path. And
[3:09:05]
that actually shows on on the plat for
the for the condos. So So there's
[3:09:11]
adequate adequate rightway to put a bike
path down County Road 99. And I think
[3:09:17]
early on I I gave um Bill Do a you know
a copy of the plat map. I can't remember
[3:09:24]
anymore.
>> Okay, we'll follow up on that note. Uh
[3:09:28]
» Grand West is a PUD and so there was um
uh the Grand West condos are a PUD and
[3:09:35]
then Grand West is a subdivision and so
yeah standard practice for um
[3:09:41]
subdivision review is to create um
connectivity and access through trails.
[3:09:49]
» Well that that's good information.
Thanks for interjecting Mark. Is there
[3:09:53]
anything else in this uh in this
presentation before we move on that
[3:09:58]
you'd like to address and like input on?
>> No, just the just those bypass and again
[3:10:03]
that's very if the city and the county
want to continue that conversation. It
[3:10:08]
was just the bypass and then the trail
along 24. Okay.
[3:10:16]
Otherwise, if they'll put in those
comments and any other comments you have
[3:10:20]
and wrap it up in a bow, then I think
DJNA can can get their what they were
[3:10:24]
contracted to do completed.
>> Okay. One one thing that I don't see uh
[3:10:30]
Bill and Mike is is a bike path or any
connectivity on 91
[3:10:36]
from, you know, some bike path or trail.
There's a lot of people that walk the
[3:10:40]
highway there. 91 from the trailer park
up to Safeway. Was that part of your
[3:10:45]
scope or No,
[3:10:49]
» that extended a little bit further north
than the limits of our scope. Our scope
[3:10:54]
went to the 91 US 24 intersection. So we
do within the plan talk about though the
[3:11:01]
need for uh with the roundabout uh each
plan for the future here a way for there
[3:11:09]
to be a crossing on the west leg of the
intersection recognizing that yeah
[3:11:12]
people do from the park here and from
other developments here do need this
[3:11:18]
connection along along the highway
there.
[3:11:21]
But that was kind of the the extent of
our our scope there was that
[3:11:24]
intersection.
[3:11:28]
» Okay.
>> May I ask a clarifying question then of
[3:11:32]
Mark? Um Mark um I I think then just so
that we have clarity as staff in helping
[3:11:38]
to administer the grant and uh uh
further planning once we've taken in the
[3:11:45]
feedback to DJNA and they can complete
the plan. Um maybe we have misunderstood
[3:11:51]
a little bit but we thought it was
within the scope even if you know we
[3:11:55]
have to do a second RFP within the the
um grant funding that we have available
[3:12:03]
to then go into further design work. Um
is that did we misunderstand um that
[3:12:11]
communication with you or is that still
a possibility for these funds? Now, now
[3:12:16]
we're getting into the difference
between there's the IG, which is the
[3:12:20]
governmental agreement, which actually
cements the funding versus the scope of
[3:12:26]
work with DJNA and with grant
applications. So, if we're done with
[3:12:31]
with this part, then we can now move on
to kind of the next step. And let me
[3:12:36]
give just a really broad explanation
here. um the grant application asks for
[3:12:42]
a certain thing from the inner mountain
TPR which was agreed to blah blah blah
[3:12:48]
gave you 700,000 you had to add a match
in there 900,000
[3:12:53]
um you then
we then did a scope of work then that
[3:12:58]
was attached to the IG and in this scope
of work we talked about what could
[3:13:03]
potentially be done sorry I'm talking
with my hands and it's showing up on the
[3:13:06]
screen but that's okay um it's
interesting seeing myself and then in my
[3:13:10]
screen and in your screen. So um the IG
itself then says okay you are you are in
[3:13:19]
covering so much funds to do this and
then you have a scope of work with DJNA
[3:13:26]
all these bits and pieces that you have
contracted that Lake County has
[3:13:30]
contracted with DJNA.
So now now we get into technicalities
[3:13:36]
which I will give you a a very firm
technicality
[3:13:41]
in that you can only do so much before
then you risk going beyond what's
[3:13:49]
allowed and then that would be a
statutory violation and I will have to
[3:13:53]
say no you can't do that. Now
we're getting to some minor gray areas.
[3:14:01]
Now, so is it possible to ask DJNA, and
this is just an example, you talked
[3:14:08]
about north of 91, go down to where that
trailer park is. I'm guessing Mountain
[3:14:14]
View Estates is what I'm seeing it as on
my map.
[3:14:18]
To me, that's a small thing that you
could It's called a change order. That's
[3:14:24]
But I'm not approving it. I'm from from
what here on out what I'm saying is
[3:14:30]
discussions would have to happen and we
would have to get approvals and and
[3:14:34]
documentation on this. So from here on
out this is just ifs and whatifs.
[3:14:41]
So please understand that. So if you
said hey it's not too much a big deal
[3:14:47]
and there's agreement amongst the my IG
folks. Yeah, it's not too much a big
[3:14:54]
deal to to change that and have DJ and
look at Mountain View Estates coming up
[3:14:59]
from 91. It's a little piece. They could
kind of look at that, draw it in or
[3:15:03]
whatever. That's that's something I
would have to get approved and I could
[3:15:10]
try and get see if that would be what it
would be to get that done. I don't know.
[3:15:17]
But again, you have come to a point with
DJNA that they have hit their scope. And
[3:15:24]
here's here's the bottom line. In all
fairness, when you go out with an RFP
[3:15:28]
and people do an advertisement or or
when people bid the the project,
[3:15:34]
that has to be fair. And I will not
budge on that fairness. So, if another
[3:15:39]
company said, "Well, we could have done
that cheaper." And you're just thrown in
[3:15:42]
a bunch of work on somebody who's
already got the the bid. That's not fair
[3:15:47]
and I I cannot allow that and I will not
allow that. So we must maintain fairness
[3:15:52]
across the board. The other issue has
really come that these funds have lagged
[3:15:58]
for quite some time and have not been
spent really well which be that be what
[3:16:03]
may we're moving through that process
the best we can. So
[3:16:10]
what you would have to do regardless now
to do any design to to really decide
[3:16:16]
okay you have this $500 and some
thousand
[3:16:20]
what do we do with it and how can it be
most efficiently used? So, here's some
[3:16:25]
ideas. What you could say maybe, and I'm
putting this as a hard maybe,
[3:16:32]
is you could request to me, hey, we may
want to do a change order to allow DJNA
[3:16:37]
to look at 91 just to make sure we we're
treating everybody fair and look at what
[3:16:43]
it would be, how many miles, what, you
know, but do we really want again a path
[3:16:48]
along 91 or do we actually want to maybe
come out Crystal? you know, that could
[3:16:54]
take an actually bigger lift of a study
than what we're expecting because if you
[3:16:59]
really look at it, there is no
alternative on my map that would allow
[3:17:05]
you to get off of 91. So, I I just don't
know. And so, that may be something that
[3:17:12]
you want to put down on a okay, maybe
for the next study or maybe for the next
[3:17:17]
effort.
But either way, DJNA may have come to
[3:17:21]
their into their SC scope into their
contract. And so we'll close that out
[3:17:27]
and
I'll have to get clarity on this, but
[3:17:32]
we'll have to either go back to the TPR
and they'll say, "Yeah, you can go ahead
[3:17:36]
and finish spending," which I think they
would expect, or you may not have to go
[3:17:40]
back to the TPR and they and because
we'll have to look at what you actually
[3:17:44]
applied for when you're applying for
that grant. And if they if there's
[3:17:48]
wiggle room in what you applied for and
applying for that grant that you could
[3:17:52]
actually go on and focus on one or two
of whatever the things that came that
[3:17:58]
DJNA came up with, then we will have to
go back out with another RFP to then
[3:18:07]
open up a scope of work for somebody.
But I would want to sit down with Lake
[3:18:12]
County and really get an idea on or or
come to some firm concepts on the limits
[3:18:22]
of that RFP and what you'd want to do
because your options now from DJNA and
[3:18:27]
and this is really what we wanted to do.
We wanted to have a broad view from the
[3:18:31]
study and then say, okay, what is
critical? What is important? What is
[3:18:36]
some lowhanging fruit that we can do?
Because there's with 500,000 there's
[3:18:41]
very little you could actually do for
construction on this.
[3:18:44]
» Yes.
>> So what could you actually get designed
[3:18:48]
that would make sense that could
possibly be built in five years? Because
[3:18:54]
anything on that sits on the shelf in
design longer than five years you either
[3:19:00]
lose an opportunity
um you you have to pull it back off the
[3:19:05]
shelf. and talking to engineers. A shelf
life for engineering plans are 3 to
[3:19:11]
seven years max.
So, I mean, they're still good, but you
[3:19:16]
you'd still have to go back and work it
out. So, if you're going to spend
[3:19:20]
500,000 on design and get it all the way
through to really good design or even
[3:19:24]
30%, or you could take two things and
say say, "Okay, we're going to see what
[3:19:28]
rightway is there. We're going to see
really what utilities there and what,
[3:19:32]
you know, what potential could be." And
so,
[3:19:35]
That could be part of the discussion,
but anything else, you can't really ask
[3:19:40]
DJ and A to do anything else
after what they've done now. And you
[3:19:47]
can't add, you can add maybe a tiny bit,
but you can't add a lot. And I'd have to
[3:19:53]
find truly what the difference is
between a tiny bit and a lot because at
[3:19:58]
some point some other company could say,
"Hey, you're you're going beyond that."
[3:20:03]
and then they get Lake County and Mark
Rogers in trouble. And I I don't want to
[3:20:08]
be in trouble.
>> So,
[3:20:11]
honestly, you know, let's wrap up DJNA's
contract with making sure you have good
[3:20:18]
documentation, making sure you have as
much out of what their scope of work as
[3:20:23]
you can get. And then we will say, okay,
and and we can do this right now. if of
[3:20:32]
those four priorities that they looked
at and again I I I did a screenshot of
[3:20:36]
their four four priorities
um
[3:20:41]
they they had they had the identifi I
pulled the wrong screenshot sorry their
[3:20:45]
four areas
um was
[3:20:50]
24 coming around there CMC
the intersection right there around
[3:20:55]
Safeway and then the bypass so you could
pick one or two of those maybe and say,
[3:21:01]
"Okay, really what is the priority here?
What is if we had 500,000
[3:21:07]
plus to spend?" Well, four 500,000 with
the grant and then 25%
[3:21:12]
you'd have to add to it for your local
match. What is it that you are
[3:21:18]
priorities? What would you really think
are the priorities to do? and then maybe
[3:21:23]
look at design, look at further
investigation
[3:21:27]
and then you guys can go into executive
session after, maybe not today or even
[3:21:32]
two weeks from now, whatever.
And then you can say, "Okay, once we're
[3:21:37]
done with DJNA, and once all those bills
are sent in, we'll know exactly how much
[3:21:43]
is left, then we'll try and hit priority
Y or Z, whatever." So, I've talked a lot
[3:21:48]
now and I'm going to go ahead and mute
my mic and then you guys can go ahead.
[3:21:53]
But is there any questions on that
specific explanation of the difference
[3:21:57]
between these various grants and awards
and and rules?
[3:22:03]
» Hey Mark, I I appreciate you explaining.
I think it would probably be good
[3:22:06]
context for you that none of the
commissioners that are here nor myself
[3:22:10]
were here when this grant was taken on
and we recognize the importance of
[3:22:14]
having a fully baked plan with a
multi-year budget so that it gets picked
[3:22:17]
up and are doing that with staff now. Um
I think really that's why we're in here
[3:22:23]
today is to figure out what did these
guys want to do with the project that
[3:22:26]
they've inherited that may or may not
have had a full scope or plan.
[3:22:31]
» Yes. And the timing on this is very good
because the timing is we can wrap up
[3:22:36]
with DJNA as much as we need to get that
totally completed. If they really do
[3:22:41]
want to say, "Hey, can we do a change
order to bring in 91?" That's a
[3:22:47]
conversation I can have with people who
have
[3:22:52]
authority to make that decision and then
we can go that direction. Otherwise,
[3:22:57]
we'll close out with DJNA and move on.
But I'll go ahead and mute.
[3:23:02]
» Mark, one real quick question. Is there
a world I I was kind of hearing you
[3:23:06]
dance around this a little. Is there a
world in which we would not be able to
[3:23:09]
continue to spend the remainder of the
grant funds?
[3:23:13]
» It's a very small small world. And let
me tell you the problem with this.
[3:23:17]
There's two little caveats in this one.
because it's gone taken so long and the
[3:23:24]
the legislature the Colorado legislature
has actually been pulling
[3:23:29]
MMO funds we've the seed dots still
worked hard to make them available your
[3:23:35]
guyses are locked in so they couldn't
really take those but they are watching
[3:23:40]
how fast they are spent and they're
watching the draw down and these have
[3:23:45]
kind of languished for this and whatever
you do we'll need to say we will get
[3:23:51]
these spent. Now I don't think and again
I don't think but there is a minor
[3:23:57]
possibility
that you'd have to let the inner
[3:24:01]
mountain TPR know, you know, because
these funds are still out there. But you
[3:24:05]
just say, "Hey, it took a while. The
commissioners changed over." You tell
[3:24:09]
them the truth. And then they'd probably
say, "Okay, go ahead and finish spending
[3:24:12]
your 5,000. It's already there." Because
if it does come back, they risk losing
[3:24:16]
it, too. So I don't see that really
happening. I I think it's a very very
[3:24:20]
minute chance, but I cannot say it won't
happen because I've seen the legislature
[3:24:25]
continue to pull these MMO funds. These
local agency funds need spent at an
[3:24:31]
efficient rate.
>> Okay.
[3:24:36]
» Okay. Thank you, Mark. And then uh just
one question. Uh this is Matt Bulock,
[3:24:40]
county commissioner. Is it fair to
future RFP recipients for us to discuss
[3:24:47]
this further or do we need to
because this grant is from C do DOT so I
[3:24:53]
understand that we can't really even
talk about county road for alternates
[3:24:57]
for our bike path. Shall we continue
with this next phase?
[3:25:02]
» Um I I don't see anything because really
what we're finishing is we're finishing
[3:25:08]
discussing maybe some priorities maybe
other things. It's free to anybody who
[3:25:12]
who wants to look because they can look
at this public documentation or whether
[3:25:16]
they can look at the minutes or
whatever. And I don't think you're
[3:25:19]
really releasing any proprietary
information that they wouldn't all have.
[3:25:24]
What would be wrong is if you were
private about it and just gave it to
[3:25:27]
DJNA and so then they'd have some sort
of leg up on the competition. I think
[3:25:33]
it's better you actually discuss it in
public. That way, anybody who can look
[3:25:37]
at the minutes down the road would have
the same ability to compete fairly.
[3:25:42]
That's what you want. A level playing
field. That's part of my job is to make
[3:25:45]
sure we have a level playing field.
>> Well, that's that's great. That's what
[3:25:51]
we want. So, uh,
[3:25:55]
just to move things forward here, I'll
just kick it off. Considering
[3:25:59]
everything that we've seen here, if it
was up to me, my priority would be 24,
[3:26:06]
the roundabout or the stoplight, but
maybe the roundabout because we have
[3:26:10]
other plans down there
uh with a sledding hill and the mineral
[3:26:15]
belt trail. So, of of all the options, I
would like to see personally that plan
[3:26:21]
move forward and the other ones put on a
back burner.
[3:26:26]
So, if we could use the other 500,000,
you know, maybe that would cover it.
[3:26:31]
Maybe not.
>> Uh, I'm glad we're talking about this
[3:26:36]
because I feel like what has come up in
the community more and more, what has
[3:26:40]
come up in the community for the longest
time is the connectivity of Mountain
[3:26:44]
View East and West and the that
dangerous highway that goes right
[3:26:49]
through it. So maybe not connecting
the Mountain View Park to town, but
[3:26:59]
safeguarding that intersection better
for the pedestrians that are crossing to
[3:27:03]
bus stops
>> and for kids who are connecting across
[3:27:08]
their neighborhood.
I I I knew not to talk about it in the
[3:27:13]
last meeting we were gonna have, but
this has been one of my biggest
[3:27:16]
curiosities is where is the work with C
dot for connecting Mountain View east
[3:27:22]
and west? And
>> so now I have a question on this one. So
[3:27:25]
you had traffic there. Did they not want
you to talk about it? I'm really
[3:27:29]
confused here.
>> Well, no, I just knew that this was
[3:27:32]
going to be on our docket.
>> Okay. Because I really I really kind of
[3:27:36]
was hoping the traffic folk were stay. I
was kind of watching them in their
[3:27:39]
presentation and they gave a good
presentation. But yeah, there's there's
[3:27:42]
so much about that those two parks and
on and on, I really wish traffic had
[3:27:46]
stayed. But even having some studies and
on and on and looking at just taking
[3:27:50]
that out to 99. But anyway,
[3:27:56]
» no, I agree now that Elsa says it, I do
see a lot of kids on that road.
[3:28:00]
» Yeah. crossing back and forth and uh but
that seems like a with the signs with
[3:28:07]
the design that is there doesn't seem
that difficult to put a flashing light
[3:28:12]
some signs and stuff. I mean
that doesn't seem I know everything's
[3:28:18]
expensive but it seems like most of that
work
[3:28:22]
is done. Well, that's why I say when
we're looking at lowhanging fruit, like
[3:28:26]
a roundabout is gonna way go over
$500,000,
[3:28:31]
» whereas some signage and maybe some
striping or
[3:28:34]
» or um sidewalk work. Yeah. Like that
would be able to be lowhanging fruit
[3:28:40]
with this.
>> So, any construction any construction
[3:28:45]
may blow this budget. What you what I
would suggest is really focus on design
[3:28:50]
of something because I think any unless
you're talking just five 800 feet of
[3:28:56]
sidewalk or whatever. I mean it's it's
entirely because the design you'd still
[3:29:00]
have to go in and design the sidewalk
check right away and right away again
[3:29:04]
maybe tight through there. Um I would
really look at DJNA's contract. Would
[3:29:12]
did were they supposed to look it right
away? Were they supposed to? I mean,
[3:29:17]
this is another thing, Bill. Do you know
if if that scope of work that you were
[3:29:22]
contracted had you look at right away?
[3:29:29]
» Oh, yeah. You know, just seeing what
the, you know, C do rightway width is.
[3:29:35]
And so con concept level.
>> Okay. All right.
[3:29:42]
Mark, a clarifying question that we had
in some of the factf finding on this is
[3:29:46]
um potentially a 30% design would get us
to the point where we could put this in
[3:29:51]
front of the IMPR for consideration for
longerterm project. Is that correct?
[3:29:56]
Would we need to advance a single
project further than that 30% threshold?
[3:30:01]
No, you could do one project to the 30%
threshold, but the problem is you didn't
[3:30:06]
contract with DJNA to take anything to
30% threshold. What you did with them is
[3:30:12]
do a really broad, which I think is
great. You did a really broad look at
[3:30:18]
what their priorities are. Now, your job
gets a little more difficult. You've got
[3:30:22]
to actually go in and pick a priority or
two priorities and say, "Okay, we want
[3:30:26]
to advance X or Y or X and Y to 30%
level plans." And then you'll have to go
[3:30:34]
out for an RFP and we'll try to really
rush that you not rush it through, but
[3:30:39]
we'll try to make sure it's efficient in
a timely effic it's efficiently done in
[3:30:43]
a timely manner.
>> Sorry for the double speak. Just
[3:30:48]
» that's that's really helpful. Well, I
think for our purposes for this meeting,
[3:30:51]
if we can walk out of this room with
guidance for CPD in terms of the
[3:30:55]
direction from the BOCC, which of these
we would like to pursue, all of that
[3:31:00]
kind of RFP development, that all comes
after, but I think we need the guidance
[3:31:04]
on the next steps from the decision
makers in this room as to which of these
[3:31:08]
do you want the energy to go into to get
to that 30 or 60 or whatever threshold
[3:31:12]
of design.
Can I can I add to that because the
[3:31:16]
numbers that we gave you in that email
are like $260,000
[3:31:21]
to move all of them forward
>> to to 30%.
[3:31:24]
» Mhm.
>> I know you read that you have that
[3:31:26]
opportunity, but I just want to be
clear. Um so one idea is to keep them
[3:31:31]
all alive. That would be one way to do
it. Um versus moving one forward.
[3:31:37]
» I like that. Yeah, that's that's so
200,000 was and these these are just
[3:31:43]
ballpark amounts. Of course, we would
have to go out to RFP to and you know
[3:31:48]
close out the plan then go out to RFP.
So, our intent was to to do as as um uh
[3:31:57]
Mark has indicated, close out the plan,
but get feedback today on what you're
[3:32:01]
hearing and what your thoughts are on
that and then look how we could
[3:32:07]
further leverage these funds to be more
competitive. So, it sounds to me like
[3:32:11]
with the funds left, we could do we
could look at advancing all three of
[3:32:16]
these projects and then push the
decision to a later date once we once
[3:32:23]
we've established our priorities. I
mean, that sounds reasonable to me.
[3:32:27]
» It's like the four. It's actually all
four.
[3:32:29]
» Okay.
>> 200,000 was just and these are
[3:32:32]
ballparks. We'd have to sus this out
better. Um and we will have to work
[3:32:36]
directly with Mark to make sure that you
know finalizing the plan then going out
[3:32:41]
through RFP to look at taking these
priorities to um a 30% design you know
[3:32:48]
but working very closely with them to
make sure that we're within our
[3:32:52]
statutory obligation the grant is
obviously what we would be doing too. M
[3:32:56]
» but um if if that would be possible for
us to have enough funding to look at
[3:33:02]
those. So maybe we have an idea of what
maybe your number your your two highest
[3:33:07]
priorities are. But if we have the
possibility to look at at all of these
[3:33:11]
that have been identified that would
probably be your first choice. It'd be
[3:33:14]
great to have maybe a second choice.
>> I I love that. Is this is our match
[3:33:21]
already budgeted for that work? it. I
think it should be.
[3:33:26]
» Yes. I mean, this
>> is it. Is it in your budget?
[3:33:29]
» It's not.
>> It's not in my The only thing that I do
[3:33:32]
is just make sure that the invoices
match the work that's been done.
[3:33:36]
» This was in Duncan. Was that
>> or where?
[3:33:38]
» I think it wasn't Tim.
>> It was I mean Tim
[3:33:45]
Feedler project. So, it never even
originated in CPD either.
[3:33:49]
» Bringing it up.
>> Honestly, I'll have to look at it. as
[3:33:52]
well since we account for grants a
little bit differently. If not, I mean,
[3:33:58]
we can figure it out if we want to
finish expending the money, but I don't
[3:34:01]
know what to talk about without looking
at the budget.
[3:34:04]
» Yeah,
>> I think that would be my only
[3:34:05]
consideration of just choosing one as
opposed to going out and doing the full
[3:34:10]
270 for all three. If if it's unlikely
that we could do all three and it's an
[3:34:16]
extra cost to us to match the grant,
that would be my that's why I would
[3:34:20]
choose one. So we can it' be great to
know finding that out.
[3:34:23]
» Thank you.
>> Commissioner Lee, you still with us? you
[3:34:29]
want got anything you'd like to add
before we uh
[3:34:33]
» Yeah, I just uh am wondering, you know,
it sounds like Commissioner Bullock, you
[3:34:42]
you're kind of keen on the roundabout
situation and and taking the planning of
[3:34:46]
that forward as well as the um Mountain
View Village East and West. Elsa, you're
[3:34:52]
really championing for Mountain View
East and West. And then um I I am
[3:34:59]
partial to the uh pedestrian path that
gets people from Mountain View east and
[3:35:04]
west into town.
>> What was the fourth one? Was that the
[3:35:09]
excuse me, sorry, the the north gateway,
>> sidewalk enhancements,
[3:35:16]
» safely. Yeah. Yeah, bus stop
bus stop and and just that traffic
[3:35:23]
combing and some ways to have better
mobility in that area.
[3:35:26]
» And then and then for our next steps,
we're looking at right now
[3:35:32]
uh wrapping this up, putting an RFP out
to take how many of these next projects
[3:35:39]
to 30% completion?
All all four or three or two?
[3:35:47]
» All four. Yeah, we'd like to look at all
four, but having like a second plan if
[3:35:51]
that doesn't work after we talk to Mark
and have a better idea of where we're
[3:35:55]
at. So, we had
>> Okay.
[3:35:58]
Commissioners have identified maybe two
priorities.
[3:36:02]
» Did you hear that, Andy?
>> Yeah, I did. What that kind of aligns
[3:36:07]
with what my concerns were with that
trying to use what's left in this in
[3:36:13]
this pot to take all four projects to a
30%
[3:36:18]
planning completion felt like a stretch
to me.
[3:36:26]
I also I worry
that
[3:36:31]
like number one, we don't have to spend
all these funds and we don't have to
[3:36:35]
match all of these funds. So, anything
that we're not matching is money we're
[3:36:41]
saving. So, if there are any of these
that we don't need to do, like that's
[3:36:45]
money that we won't spend.
I just want us to have that little flag.
[3:36:50]
And then the MMO funding that comes
through the IMTPR,
[3:36:56]
like has been said already in this room,
is at risk. It's at greater and greater
[3:37:00]
risk every single year with like the
things that are going on the ballot, the
[3:37:04]
way that the legislature is trying to
mitigate those impacts. Like MOF is
[3:37:10]
going to
we don't know how much it's going to be
[3:37:14]
around. So, I think I personally would
rather have like a streamlined let's get
[3:37:18]
this one thing that done that we can get
done now knowing that we won't be able
[3:37:23]
to get all four done or probably even
two. Um, it's just a consideration I
[3:37:29]
wanted to bring up in case it impacts
how we would make a decision.
[3:37:35]
» Well, I just to remind you this grant is
just planning and design.
[3:37:41]
» I know. So, we can't actually like use
this funding to implement anything.
[3:37:46]
» I know. I'm saying that
>> getting it done.
[3:37:48]
» To get it done is less and less likely
in the future. So, if we know we're not
[3:37:53]
going to be able to get it done, why
spend even the extra matching dollars
[3:37:57]
» to do the planning,
>> right? A plan that's not going to
[3:38:01]
» we Yeah. If we know it's not
>> Mark, did you want to chime in there?
[3:38:05]
» Sure.
>> In your hand.
[3:38:07]
» Sorry. I do. I do. I try not to
interrupt. It's just hard to find the
[3:38:11]
hand here. Here, I'll give you some
reasons why you want to continue. One,
[3:38:15]
yeah, your funding may be kind of iffy
right now in the future, but future can
[3:38:21]
get really future could be here really
fast with new funding. You just never
[3:38:27]
know with local agency funding. Um, it
just depends in four years, five years,
[3:38:33]
you could have that. So, you want to
continue down the road you're looking at
[3:38:38]
because if it's not there, you're going
to eventually have to get 30% plans at
[3:38:43]
some time. Now, to better understand 30%
plans, what you're wanting, and Bill,
[3:38:49]
you may want to help me out a little bit
here,
[3:38:52]
you're basically going to be getting a
good rightway set of plans of what's
[3:38:58]
there and what's not, what the potential
has. Because at 30% plans, what you're
[3:39:03]
really looking for is it's better than
back a napkin, but it's not you can't
[3:39:08]
really start construction on it yet. You
want your rideway done. You want to make
[3:39:13]
sure if there's any utilities are in the
way. So, you'll kind of do a a overview
[3:39:18]
of what utilities are there. Rightway is
crucial because right away can kill a
[3:39:24]
project before anything else does
because it gets so expensive that you
[3:39:28]
can't do anything. So you want to look
at rightway, you want to look at
[3:39:34]
feasibility type stuff. So if you've got
really steep terrain
[3:39:39]
and you don't want that and you're going
to have to do some curves kind of you
[3:39:43]
you're going to basically it's called
field inspection review is 30% plans.
[3:39:48]
You're going to get estimates that are
not just kind of guesses. You're going
[3:39:53]
to get good estimates on those projects.
You're going to have the rightway plans
[3:39:59]
or not plans, but you're going to have
at least known sections and and those
[3:40:04]
are good for, you know, if you if
they're not going to get sold off, it's
[3:40:08]
like state property or whatever. If it's
private property, you know, you want to
[3:40:11]
avoid it. So, with the FIR, the field
inspection review plans, you're going to
[3:40:17]
have a pretty solid concept of the
elevation, you know, where it's going to
[3:40:22]
go, if if it's even feasible. you're
going to have the rightway and and
[3:40:27]
potential utilities and also envir
environmental look at that and typically
[3:40:32]
the environmental is covered within
region 3. We go out there and just do a
[3:40:36]
brief review. So that's cover all our
local agency projects are covered by we
[3:40:41]
don't charge when we do our
environmental review. So really, you'd
[3:40:44]
just be paying for
really good concept designs that can
[3:40:52]
kind of show elevation, show
feasibility, and the rightway. Those
[3:40:56]
that's really what you want more than
anything out of your 30% plans. And
[3:41:04]
the the bypass would be a little bit
harder to do because it's so some of
[3:41:09]
those areas are so big and you're going
to be crossing so much through there.
[3:41:13]
But definitely on the other three you
can get pretty good could could get
[3:41:18]
pretty good through FIR level plans. So
then you have that because these funds
[3:41:27]
right now they may not be coming around
right away but you have them now. I
[3:41:33]
would use them and then just cross your
fingers and hope that more local agency
[3:41:40]
funds become available down the road.
>> Okay. Well, thank you, Mark. Uh,
[3:41:48]
yeah, I think I'd be willing to uh
eliminate the bypass and then I guess
[3:41:54]
the question is could we get all the
remaining three
[3:41:59]
to 30% with the funds we have left?
That's that'd be ideal. And that's what
[3:42:03]
you're saying, Mark. So that'd be the
next step. And then we prioritize those
[3:42:09]
three. If we can't get those three done
with the funds we have left, then we
[3:42:14]
start we eliminate one at a time.
>> And it sounds like from staff that we
[3:42:18]
can get that done,
>> that we could get all three to 30%.
[3:42:22]
» 270
>> is what it would cost to get all of them
[3:42:25]
» and the bypass.
>> And the bypass. And I just want to
[3:42:28]
triple check that that so just for
context
[3:42:32]
grant matches should be carried forward
>> should be
[3:42:37]
» um if they were recorded in restricted
account codes uh I was not here neither
[3:42:42]
was Will at that time so I just want to
make sure that's actually what happened
[3:42:45]
with the match.
So that's what we need to know first.
[3:42:49]
Yeah.
>> Does this cost us extra money or have we
[3:42:52]
allocated the funds?
>> And then number two, we will create an
[3:42:57]
RFP
for the 30%.
[3:43:00]
» Design
>> for all four.
[3:43:02]
» For all four if that's the case. If it's
not the case that we have the funds,
[3:43:06]
then we'll come back and have a
conversation about how much we want to
[3:43:08]
spend. Yeah. And then prioritize from
there.
[3:43:12]
» Okay.
>> Great.
[3:43:14]
» Talk about a roundabout. Holy moly.
It's felt harder than it needed to be.
[3:43:26]
» Can I add one other thing
>> also? I would really love to have a
[3:43:31]
schedule. Sorry if I keep I would love
to have a schedule to make sure that we
[3:43:35]
keep on a path here. So, a schedule as
far as when DJNA,
[3:43:41]
all that information is done and closed
out and then we could because we could
[3:43:46]
be talking about the RF, the future RFP
while we're while they're still going on
[3:43:51]
there and then once we have that closed
out, we know exactly how much is done.
[3:43:56]
» We hear you loud and clear, Mark. We
really appreciate that input.
[3:44:01]
» Yeah, thank you for that, Mark. One of
one of the things we clarified is the
[3:44:05]
IGA we have with them is good through
July of of 2033.
[3:44:10]
» Okay.
>> So even though maybe we could be going
[3:44:13]
faster, we've got some time.
>> Yeah.
[3:44:15]
» But what we hear you though, Mark, and
and we'll we'll start working on that
[3:44:20]
directly with you and make sure or at
least check in with you and have those
[3:44:23]
checkpoints. But that makes total sense.
[3:44:28]
Mark, how big is the list of
deliverables you would want to see on a
[3:44:32]
schedule?
[3:44:36]
» A very high level. So, basically, it's
just going to be
[3:44:41]
we're going to go out to add with an RFP
X, you know, by certain month and year.
[3:44:47]
We're going to close it out with DJNA by
a certain next and month and year. And
[3:44:51]
then because you I really don't want you
going out for another RFP till DJNA is
[3:44:56]
done. And I mean, we can discuss it. We
can get it all drafted, but we don't
[3:45:00]
want to go out until we have that taken
care of. That way, we know exactly how
[3:45:06]
much money is out there. That's the key.
And then as soon as we get a new person
[3:45:12]
on or a new or or we get DJ, whatever,
when we get the that one filled, then
[3:45:20]
they need to have a scope that they go
right in and they know exactly what they
[3:45:24]
have to do. They have to get the
rightway. They got to get the utilities.
[3:45:27]
They have to get all this done and
present it to you.
[3:45:31]
» Okay,
>> great. Thank you.
[3:45:34]
» I think we got path forward. Thanks for
your input, Mark.
[3:45:38]
» Thank you.
>> If you guys are done with me, done
[3:45:41]
questions. I'll go ahead and let you go
ahead. Any other questions?
[3:45:46]
» Okay.
>> None for me. Thank you, Mark.
[3:45:49]
» And again, I have my phone number. If
there's something you guys need, be
[3:45:53]
please give me a call.
Thank you so much.
[3:45:56]
» Thanks, Mark.
>> You got it.
[3:46:04]
» Okay, next steps.
[3:46:08]
Pete,
>> can I make a general comment?
[3:46:11]
» Sure.
>> I think you need to um um the DJNA
[3:46:18]
proposal had, you know, a lot more
public interaction, you know, than you
[3:46:22]
guys just deciding right away. I think
that certainly would be appropriate to
[3:46:27]
have a town hall and and you know
address the the um the projects and see
[3:46:33]
what what the people are interested in.
Um I think that was contemplated. I'd
[3:46:38]
hate to see that you know that taken out
of the out of the process. Um and um
[3:46:46]
let's see.
Um
[3:46:51]
yeah, I I just think that there needs to
be more public process in this and I
[3:46:54]
think that was promised. The other thing
is that you know there's no data draft
[3:46:58]
report out there that should be made
available to the public as well to you
[3:47:02]
know to inform the public as to what
DJNA has done, what conclusions they've
[3:47:08]
reached, how they've reached them. Um
I've been asking for the draft report
[3:47:12]
for about six months now and it's always
been, you know, in county review. So,
[3:47:16]
there's got to be some paper out there
that's available for review and the
[3:47:20]
public ought to have a chance to to
review it and comment.
[3:47:25]
» Thanks.
>> Thank you, Pete.
[3:47:28]
» Yeah, I can appreciate that sentiment as
we go back and and look at this and talk
[3:47:32]
with Mark.
um because this grant has been lingering
[3:47:37]
out there for a while. It will really
depend on like how much time we have to
[3:47:42]
do something with it, especially because
there was not a fully developed plan
[3:47:47]
that we I think all have in front of us
to follow. So I think whether we can do
[3:47:52]
that or not will partially depend on the
timing of the funding that's left
[3:47:58]
available and and what was written into
the grant when it was applied for. But
[3:48:03]
we can definitely update you once we
have some conversations with him about
[3:48:07]
how much time we have left to explain
the
[3:48:10]
» and if the the match truly good.
>> I was just talking about,
[3:48:16]
» you know, Mark was making a big deal
about closing out the DGNA part.
[3:48:20]
» You know, what what deliverables, you
know, they had in their in their
[3:48:24]
proposal that were in the RFP that still
need to be to be done. And I think the
[3:48:28]
public interaction piece still needs to
be done.
[3:48:32]
and and the plan does um include there
was engagement um done by the
[3:48:37]
consultants. Um so
I did include public engagement that
[3:48:42]
that is within the report that we've
provided.
[3:48:46]
» That's what I was
>> So there was some included we had to
[3:48:50]
pivot just a little bit on an actual
event in the um manufactured home
[3:48:54]
community. Um but other than that um I
don't know if you want to hear about
[3:48:58]
that or not but there was public
engagement done as part of it.
[3:49:02]
» Thank you.
>> I remember that.
[3:49:03]
» Yeah.
>> Yeah. Yeah. Yeah.
[3:49:04]
» It kind of over overlapped a bit with
the L community project.
[3:49:07]
» Y trying to tie it together since we
knew we had people gathering anyway. Y
[3:49:12]
» so it was during that time.
>> It was like the beginning of when we
[3:49:15]
were seated.
>> Yeah.
[3:49:18]
» Right.
>> Yeah.
[3:49:19]
» Yeah.
>> Yeah. That's true.
[3:49:21]
» But it was part of the scope and it was
included. Yeah. And we didn't want to we
[3:49:26]
didn't want to send out the draft until
the board really had an opportunity to
[3:49:30]
review it. So, you know, that that's
part of why and it's been six months
[3:49:36]
easily.
>> Okay.
[3:49:39]
» Well, good. Well, thanks for the hard
work on this, you guys. Let's uh take
[3:49:44]
all this input and move forward.
Hate to see this money disappear before
[3:49:50]
we can use it.
>> Yeah. Any
[3:49:54]
questions you have for us, Bill or Mike?
[3:49:59]
» Um, not right now. I think, uh, you
know, we heard Mark Mark's comments and
[3:50:04]
I think, uh, have good understanding of
some items to revise as it relates to
[3:50:10]
that uh, the bike path concept within
the document. Um, and then we'll circle
[3:50:15]
back with Melissa and Ann for any other
um items that we need to to clean up or
[3:50:21]
incorporate in uh to put together uh a
final draft of that document.
[3:50:27]
» Okay. Thank you.
>> Thanks.
[3:50:29]
» Thank you.
[3:50:34]
» All right. Should we close it out?
Conclude our Lake County Commissioners
[3:50:40]
work session. Thanks all for coming.
Thank you everybody online.
[3:50:45]
» Thank you chair. Thank you Elsa. Thank
you staff.
[3:50:50]
» Thank you Andy.
Get better, Andy. Hey here.