Agenda
[1:36]
CALL TO ORDER
[1:55]
PLEDGE OF ALLEGIANCE
[2:25]
ROLL CALL
[2:42]
PUBLIC COMMENTS - NON-AGENDIZED ITEMS - 3 MINUTE
[2:51]
CONSENT CALENDAR
[3:37]
Planning Application No. 2020-103 (Baker Street Warehouse Project) – A Proposal to Develop Two Warehouse Buildings Totaling 1,000,451 Square Feet and Related Site Improvements on an Approximately 140-Acre Site located at the Intersection of Baker Street and Pierce Street
[1:22:53]
STAFF COMMENTS
[1:22:57]
CITY ATTORNEY COMMENTS
[1:23:01]
COMMISSIONERS' COMMENTS
[1:23:20]
ADJOURNMENT
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[1:42]
All right. I hereby call the regular meeting of the
[1:46]
Planning Commission to order and welcome everybody. This is probably
[1:49]
one of the most full houses we've seen in quite
[1:52]
some time. So thank you all for coming. Please stand
[1:54]
for the Pledge of Allegiance. Mr. Grayed us tonight. Do
[2:02]
you lead us tonight. I pledge allegiance to the fight
[2:08]
of the United States of America. And to the Republic
[2:12]
for witch it stands, a nation under God, indivisible with
[2:17]
liberty and justice for all. Thank you, maybe seated. Will
[2:27]
you please call the roll. Commissioner Martin. Here. Commissioner Peace.
[2:32]
President. Commissioner Gray. Present. Vice chair divorce. Present. And chair
[2:38]
Peters. Present. All right. Secretary, have we received any
[2:48]
request to speak on non - agendaised items? We have
[2:51]
not. All right. Moving on to the consent calendar. We
[2:55]
have one item on the consent calendar that needs approval.
[2:59]
May have a motion to approve the consent calendar.
[3:11]
All right, we have a motion by commissioner gray, a
[3:14]
second by commissioner Martin. Please record your vote.
[3:28]
Hi, I believe that that passes. That motion passes unanimously.
[3:35]
Unanimously, thank you. All right. Moving on to the public
[3:44]
hearing item. We have item number 6. 1 planning application
[3:50]
number 20 - 103 Baker Street Warehouse Project. A proposal
[3:57]
to develop two warehouse buildings, totaling 1, 451, 000, or
[4:03]
451 square feet and related site improvements on the approximate
[4:08]
140 acre site located at the intersection of Baker Street
[4:13]
and Pearce Street. The public hearing is now open and
[4:18]
the time is 602. Are there any disclosures from commissioners.
[4:24]
No. Secretary, do you have proof of publication that notices
[4:30]
as required by law have been given? Yes, ma'am. Did
[4:34]
we have the complete file of exhibits correspondence and other
[4:37]
documents? Yes, we do. Are there any written communications on
[4:41]
this matter. Yes, we've received 20 written communications. They were
[4:45]
entered into the public record and distributed to the planning
[4:48]
commission and to the public. All right. City staff, please
[4:53]
introduce yourself and provide a staff report on this item.
[4:58]
Thank you, Chair. And good evening, commissioners. My name is
[5:00]
Nancy Winn, Planning Manager with the Community Development Department. The
[5:04]
item before you tonight is planning application number 2020 -
[5:07]
103. Which is for the industrial project known as the
[5:11]
Baker Street Warehouse Project. So the project site is located
[5:16]
at the intersection of Baker and Peer Streets. The site
[5:20]
is currently has two different industrial zones. It has M1,
[5:24]
which is limited manufacturing, as well as M2, which is
[5:27]
general manufacturing. So the project site is currently vacant and
[5:32]
undeveloped and encompasses approximately 140 acres. There's our three, so
[5:38]
a few different project components. So the first is the
[5:42]
warehouse development, which would be 60, about 65 acres, seven
[5:46]
acres would be for offsite improvements and a little over
[5:49]
33 acres would be restored for conservation purposes. There's also
[5:52]
about a two and a half acre buffer zone in
[5:55]
between the warehouse and the rest, the conservation area. So
[5:58]
this exhibit here kind of shows those different various components
[6:02]
with the red being the warehouse development, the green being
[6:05]
the conservation area, and then the oranges are the off
[6:08]
- site improvements. And then the sliberal of purple right
[6:11]
in between the orange and the green that will act
[6:13]
as the buffer zone. So the proposed project is, as
[6:19]
I mentioned, an industrial development with two warehouse buildings totaling
[6:23]
approximately one million square feet. So the project includes several
[6:27]
planning application requests, which I've listed here, and I'll run
[6:30]
through quickly. So there's a zone change to change two
[6:34]
of the M1 parcels into M2 for zoning consistency. There's
[6:39]
a tentative parcel map associated with the project into two
[6:45]
parcels. Design review to establish the design for the buildings
[6:49]
as well as the project site. The CUP to allow
[6:52]
M2 uses within 300 feet of a residential zone, a
[6:56]
second CUP request to exceed the 45 - foot building
[7:00]
height. And lastly, a development agreement or a DA to
[7:04]
specify fee contributions among other items that are above and
[7:07]
beyond the development requirements. So this is the site plan,
[7:13]
which shows the building one along the property frontage on
[7:17]
Peer Street and building two right behind it to the
[7:20]
rear of the project site. So the project site would
[7:22]
have ample landscaping throughout the site, including a perimeter landscaping
[7:28]
that would include large 24 and 36 inch box trees.
[7:34]
So as I mentioned in my previous slide, the project
[7:37]
is requesting a zone change. Um, in it specifically only
[7:41]
affecting two of the M1 parcels, um, so if you
[7:44]
look at the current zoning exhibit, it's the, um, lighter
[7:48]
blue. And then adjacent, you can see the existing M2.
[7:52]
So if you look at the proposed zoning, it will
[7:54]
all end up being M2 just for consistent zoning throughout
[7:58]
the project site. The general plan LEN uses as a
[8:01]
nation remains the scene. It would still be limited industrial.
[8:05]
And the project does not involve any other land use
[8:07]
changes to the surrounding, um, properties, including any of the
[8:10]
residential zone properties. So the next few slides are renderings
[8:18]
of the, um, proposed design. So the, this one shows
[8:21]
the, um. Kind of an overview of both buildings or
[8:24]
the project site as you're driving along baker. Baker street,
[8:29]
excuse me. And then this is building one, um, also
[8:33]
showing the view from Baker Street. And then of course
[8:36]
we have building two. In conjunction with the design review.
[8:44]
The project is requesting a parking reduction, um, which staff
[8:47]
is supportive of. Because it, uh, it's supported by a
[8:52]
parking study. And the parking study, um, reveals several things
[8:56]
in order to come to the conclusion that the proposed
[8:58]
parking rate would be appropriate. So there was comparison of
[9:02]
the cities, um, warehousing parking requirement against a nationwide average.
[9:07]
Also comparison with our surrounding, um, neighboring cities that immediately
[9:10]
adjacent one as well as more regional. The cities that
[9:13]
have, um, more warehousing developments. And then lastly, there was
[9:18]
also surveys at three similar scale warehouse buildings. And I
[9:22]
find an interest to staff founding interesting enough that the
[9:24]
survey counts showed that there is actually a pretty big
[9:28]
surplus of parking available. So for that reason, um, we
[9:31]
don't anticipate a parking impact. To occur here. But the
[9:36]
project does include a condition of approval to address any
[9:41]
potential, if there are any potential parking impacts in the
[9:43]
future. Okay. So as for the two CUPs, as I
[9:48]
mentioned, the first one is to allow M2 uses within
[9:50]
a 300 feet of a residential zone, um, which is
[9:53]
measured from property lying to property line. So even though
[9:57]
the project is adjacent to a resident ja zone, the
[10:00]
properties are currently undeveloped, but nonetheless, the project's building especially
[10:04]
the loading docks as well as the parking areas have
[10:06]
been designed to create a buffer between the project and
[10:10]
the existing and future residential uses. And then the second
[10:14]
CUP is to exceed the 45 foot building height. So
[10:17]
both buildings are requesting to increase the height due to
[10:21]
the design. And the increased height you'll see is primarily
[10:25]
at the front of the buildings, um, which features an
[10:28]
enhanced corner design that helps, um, helps and better guide
[10:32]
visitors to the main entrances. So the project, so the
[10:40]
city council adopted a good naper policy. And that was
[10:43]
specifically in response to some of the large - scale
[10:45]
warehousing projects that the inland empire region has been experiencing.
[10:50]
And so those project was reviewed for compliance with the
[10:53]
good neighbor policy, just to back up really quickly. This
[10:57]
policy only applies to buildings that are over 250, 000
[11:02]
square feet. So in this case, it only applies to
[11:04]
building two, because building two is 788, 000 versus the
[11:08]
other one is only 212. So some of the compliance
[11:14]
features of building to, the loading docs, the parking areas,
[11:18]
the truck bays are located over a thousand feet from
[11:21]
the nearest residences. The loading docs truck bays are also
[11:27]
oriented away from the residences. So they don't face the
[11:29]
residency on the opposite other side of the building. There's
[11:32]
multiple access points, um, with three lanes each. So they're
[11:36]
just going to provide adequate onset queuing to prevent any,
[11:39]
um, spillover traffic unto the public streets. Um, as I
[11:44]
mentioned earlier, perimeter landscaping with large 24 and 36 inch
[11:47]
box trees as well as a screening wall. And then
[11:50]
of course the condition of approval included to make sure
[11:53]
that, um, going into plant trick pride to issuance of
[11:57]
building permits that the project continues to comply with the
[12:00]
good neighborhood policy. So I just want to quickly touch
[12:07]
on the tentative parcel map associated with the project. So
[12:10]
as I said earlier, the 10 existing parcels that the
[12:15]
warehouse buildings are going to be developed on. They're all
[12:17]
going to be merge or consolidated into two parcels. Parcel
[12:20]
one and parcel two with one building on each parcel.
[12:24]
And of course the, um, driveways as well as the
[12:27]
parking lot. There'll reciprocal axis or share to access agreement
[12:30]
would be required. And lastly, the project concludes, like I
[12:38]
said, a DA, her development agreement, um, the developer has
[12:40]
agreed to contribute nine million dollars to the city, which
[12:44]
would go towards future roadway improvements, um, and by the
[12:46]
way, the project would be required to do street improvements
[12:50]
along their project frontage. So the nine million dollars is
[12:53]
in addition to that. Exchange for the contribution, the project
[12:58]
receives, um, longer entitlement period. So instead of the typical
[13:01]
two year that's in the menu super code, the project
[13:04]
would have seven years. And then, um, the cities development
[13:09]
impact fees are not applicable to the project. So I
[13:15]
know the wording here is kind of squeeze and small,
[13:18]
um, but staff is recommending that the planning commission adopt
[13:21]
the following resolutions and recommend that the city council certify
[13:24]
the project's environmental impact report as well as approve the
[13:28]
project's applications requests. So that concludes my staff presentation, but
[13:32]
the applicant has also prepared a presentation for you tonight.
[13:38]
All right. Thank you very much.
[14:05]
There we go. Better now. Honorable chair, vice chair and
[14:09]
commissioners. My name is Daned Planjin. I'm with EPD solutions
[14:13]
and our team's been representing ecosystem investment partners. Since the
[14:17]
beginning of the Baker Street project. This entitlement has taken
[14:21]
six and a half years. And it wouldn't be possible
[14:23]
without all the support from staff. Um, everyone in every
[14:27]
department here has been along our side helping us make
[14:30]
sure that we're bringing forth the best possible project possible.
[14:34]
We'd also like to extend our appreciation for the support
[14:37]
from the Riverside County Conservation Authority in the California Fish
[14:41]
and Wildlife for their support throughout this process. Ecosystem investment
[14:50]
partners is a private equity real estate firm that supports
[14:54]
ecological restoration projects. Their vision is clear. Balanced biological restoration
[14:59]
and conservation with e - commerce. They're currently have 55
[15:04]
active mitigation banks and restoration projects across 13 states. And
[15:09]
since 2019, EIP is partnered with the RCA to assemble
[15:13]
land with critical conservation value alongside surplus land for development.
[15:18]
The baker project is the poster child for this initiative.
[15:29]
As many may not know, EIP has been in this
[15:31]
community for a lot longer than the baker project, Riverside
[15:34]
legacy, also known as Walker Canyon, was an initiative brought
[15:38]
forward by EIP. Ultimately 240 acres were put into conservation.
[15:44]
Um, with the RCA.
[15:54]
This project also has been no small feat in terms
[15:57]
of the acquisition and the assemblage that was required as
[16:00]
part of the project. In total 15 different parcels were
[16:03]
acquired. The 10 outlined in red is the development footprint.
[16:08]
And the five outlined in yellow are those that have
[16:10]
already been conveyed to the RCA for conservation and perpetuity.
[16:21]
The land use is limited industrial. The project is consistent
[16:25]
with the general plan. The zoning is M1 and M2
[16:28]
split. The project is proposing a change of zone to
[16:32]
M2. And this is really to bring in the best
[16:34]
possible use we can. Um, the full range of industrial
[16:37]
and manufacturing use is that are accessible under the M2.
[16:42]
Possible growth and employment. Triple A credit tenant. Also building
[16:46]
specifications. Today's day and age is requiring the best out
[16:50]
there in the industry. And we want to make sure
[16:52]
that this project is able to provide for that. Also
[16:55]
the M2 opens up for more skilled uses that will
[16:57]
allow for the highs paying jobs. A
[17:07]
little bit of history on this property. It's been industrial.
[17:11]
It has had an industrial land use for more than
[17:13]
30 years. And that there are known industrial plan uses
[17:17]
that date back to pre - city and corporation on
[17:20]
the site. It's also included within the business district of
[17:23]
the city's general plan. The purpose of that general plan
[17:27]
is to encourage industrial and commercial uses with sensitivity to
[17:30]
surrounding areas such as floodways, wetlands and floodplains.
[17:43]
The site has a lot of existing challenges that we've
[17:46]
had to work through over the past six and a
[17:48]
half years. Two of those are the Southern California Edison
[17:51]
easements as well as the topography of the site. Outlined
[17:54]
on your screen is an exhibit of our site plan,
[17:57]
which shows two of the SE easements in high voltage
[18:00]
utility lines that run through the site. The first is
[18:04]
a 330 foot SE easement and utilitylines that run perpendicular
[18:08]
between building one and building two. Also the IV Glen
[18:13]
high voltage steel poles run along the property's frontage of
[18:16]
Baker. Southern California Edison has strict requirements for development within
[18:21]
these areas that have posed challenges for us that we've
[18:24]
had to work through to make sure that the plan
[18:26]
works. Additionally, the topography. And actually through the design process,
[18:31]
this constraint is actually proven to be a benefit. And
[18:34]
that the site slopes, uh, very extreme to the top
[18:38]
of a hill. And through our design, uh, the area
[18:40]
outlined in red is actually going to be a retaining
[18:43]
wall condition at the rear of the property. That's the
[18:46]
approximate location that the property will not be visible from
[18:50]
any of the residential communities to the rear of the
[18:53]
property. So as you head west towards Pear Street, it
[18:57]
comes back to grade. As you go away from Peer
[19:00]
Street down Baker, the slope comes up and ultimately within
[19:04]
that area, it's not visible.
[19:14]
As mentioned, there is a large biological component part of
[19:18]
this project. EIP is spent. Approximately 3. 75 million dollars.
[19:24]
In terms of tying up this area of land. And
[19:27]
this area's already been conveyed to the RCA for conservation
[19:30]
and perpetuity. The project helps the city of Lake Elsinore
[19:37]
achieve the MSHCP reserve assembly requirements. And contributes to the
[19:41]
wide area plan for the ultimate conservation goal of 500,
[19:44]
000 acres. There's different repairing and riverine habitat that will
[19:50]
be addressed through the project. That includes three vernal pools.
[19:54]
Two, which will be expanded as well as several sensitive
[19:56]
plants that will either be protected in place or restored
[20:00]
through the conservation area. The property will
[20:10]
use baker and nickels to the I - 215 freeway.
[20:13]
The city - led current general planned update includes Baker
[20:18]
and Nichols within the circulation element for truck access.
[20:29]
So related to traffic generation throughout a lot of our
[20:33]
community outreach meetings that we've had, a lot of conversations
[20:36]
that I've been personally involved in, inquiring about the use
[20:39]
that we're proposing concerns related to the traffic generation. And
[20:43]
I guess questions as to why we aren't proposing a
[20:46]
mixed use or a residential compatibility there. Um, other than
[20:50]
it not being allowed within the zoning designation and the
[20:53]
general plan, um, I think it was interesting that we
[20:57]
went ahead and shared this. So this is a daily
[20:59]
trips comparison by use. The baker project is on the
[21:03]
far left. And as you can see, we did a
[21:06]
comparison against other uses that could potentially go on the
[21:10]
site such as business park, medium residential, commercial and mixed
[21:14]
use. As you can see, the industrial project generates far
[21:18]
fewer or the least amount of trips out of any
[21:20]
of the other alternative uses that could be considered.
[21:32]
As Nancy mentioned, there's certain offsite improvements that the project's
[21:35]
committed to making the build out of Baker Street along
[21:37]
the frontage, which is the general plan road. The realignment
[21:41]
of Baker into nickels for its ultimate configuration as coordinated
[21:45]
with the engineering department. The signalization of Baker and Nichols
[21:50]
and the build - out appear street along the project
[21:52]
frontage. These two renderings were shared, but ultimately I just
[21:59]
want to acknowledge that we spent our great deal of
[22:01]
time and effort working with staff to make sure that
[22:05]
the architectural enhancements in the futures of the building are
[22:07]
compatible with the surrounding area. Ensuring that the truck court
[22:11]
and screening from the public right - of - way
[22:13]
was addressed. And also that there's an abundance of landscaping
[22:16]
and screening. I believe Nancy also mentioned this, but the
[22:24]
project is in compliant with all sitting and design guidelines
[22:28]
of the good neighbor policy. Um, well, the good neighbor
[22:32]
policy doesn't apply to buildings under 250, 000 square feet.
[22:36]
We did every attempt necessary to make sure that we
[22:38]
could also ensure that that building was also designed to
[22:41]
meet everything that we could. It's also in compliance with
[22:45]
all the construction and operational measures of the Ganebra policy.
[22:51]
In terms of economic benefits, about 350, 000 dollars is
[22:56]
anticipated to go to the city's general fund annually. Job
[23:00]
creation and labor income, both on a construction basis as
[23:03]
well as an ongoing operational basis. One - time fees,
[23:11]
so approximately 870, 000 dollars to the Lake Elsanor Unified
[23:14]
School District 10. 5 million in terms of local and
[23:18]
regional transportation and fire contributions, as well as 3. 9
[23:24]
million to other agencies. Some of those agencies include the
[23:28]
water district, um, MSHCP mitigation fees, and final engineering plan
[23:33]
check fees at the applicant will pay toward to the
[23:35]
city. Related to the development agreement. We spent a great
[23:42]
deal of time with city managers'office, really working through this.
[23:46]
And I think the major calling and requests from the
[23:48]
city was we need money, and we need money sooner.
[23:50]
And so that's how we've structured the development agreement. Um,
[23:54]
certain milestones that I would say are a little bit
[23:58]
abnormal for the types of projects that we work on
[24:00]
to try and get fund sooner so that those funds
[24:02]
can be put to work. Um, I think overall we
[24:05]
acknowledge that this area needs improvements. These are regional issues.
[24:10]
They need regional solutioning. We feel really good behind the
[24:13]
contribution that we're making so that this money can be
[24:16]
put to work and that there can be an improvement
[24:18]
made out here. Community outreach, community outreach has been a
[24:24]
big part of our initiative, um, we've really have tried
[24:27]
and I've let all those efforts to be transparent and
[24:30]
truthful, making sure that we, you know, understand what the
[24:33]
community's concerns are, you know, revise our plans and do
[24:37]
what we can to work with them. We've had four
[24:39]
community outreach meetings, two in 2024 and two more recently
[24:43]
in 2026. Um, and it's been a big part of,
[24:45]
you know, what we've done and how we've showed up
[24:47]
for the community. And then just lastly, in terms of
[24:52]
timing, these things take time. So six and a half
[24:54]
years to get where we're standing right now. If this
[24:58]
project is approved, we would go into final engineering drawings.
[25:01]
Followed by construction and opening year. So assuming no roadblocks
[25:06]
in our way, um, the earliest that we would foresee
[25:09]
this building being built, uh, or buildings being built would
[25:12]
be Q1 of 2030. So we have some time ahead
[25:14]
of us. And that concludes my presentation. Happy to address
[25:20]
any questions you may have. One question. Of course. You
[25:29]
mentioned the screening of the site from the nearby residential,
[25:34]
both with walls and with landscaping and so forth. Could
[25:37]
you remind us that there's a differential. Vertically between the
[25:43]
nearest residents. And this property site? Could you mention that?
[25:48]
Yeah. So, um, I would say that the nearest community
[25:52]
that, um, is partially built would be the KB home
[25:56]
development. It's about a fifth of a mile away. Um,
[25:59]
there is an elevation grade, but there's also an L.
[26:02]
So the elevation grade behind of where those residences are.
[26:06]
But there's also an elevation grade difference on the project
[26:09]
site from west to east. So, you know, those residences,
[26:13]
and we've done visual simulations are included with our project
[26:16]
documents, um, indicate the placement of the building, the ultimate
[26:20]
grade. And, you know, that is the approximate location that
[26:24]
I outlined. Which wouldn't be visible from those, from that
[26:30]
community or any other community. To that matter. Right. Thank
[26:33]
you. All right. Thank you very much. I was a
[26:38]
great, um, presentation. Thank you. Well now. We'll open it
[26:46]
up here for public, uh, just right now. So we'll
[26:49]
receive comments from members of the public who wish to
[26:52]
speak on this manner. We do have a packed house
[26:55]
tonight. So, um, please keep in mind that each person
[26:58]
may dress the planning commission for maximum of three minutes.
[27:01]
Madam Secretary. I'm assuming we've received requests to speak tonight.
[27:06]
Corre. Yes. We've received 14 requests to speak tonight. 14.
[27:10]
The first will be Juan Cerrado.
[27:19]
All right. If you could give us your name, um,
[27:23]
where you live. So my name is throttle. You know,
[27:28]
we cover a lot of this area, Riversed County. So
[27:31]
this is where our members live here in this area.
[27:34]
And you're with, if you could tell you no. Okay.
[27:36]
Yeah. Like you're in a union. Uh, so good evening
[27:39]
commissioners. My name is Juan Sorrow with the labor union
[27:42]
of North America. Um, here tonight to speak and support
[27:46]
of the Baker Street warehouse project. Uh, this is a
[27:49]
significant investment in the city of Lake Elsinor. And I
[27:52]
believe projects like this can bring real opportunities to the
[27:55]
community. A project of this size means construction jobs for
[27:59]
local workers, opportunities for apprentices. To get valuable experience and
[28:03]
build a career. Uh, it also means, uh, the potential
[28:06]
for long - term jobs once these buildings are up
[28:09]
in opening. Um, I also think that it's important that,
[28:12]
uh, Lake Illsonor continues to grow, uh, the people who
[28:16]
live here have the opportunity to benefit from the growth.
[28:19]
Uh, we want to see these projects built with a
[28:22]
strong local workforce. And good paying jobs that help families
[28:26]
support themselves and keep money right here in the community.
[28:29]
I appreciate the commission taking the time to review this
[28:32]
project for those reasons. I sprewfully ask that you support
[28:35]
the Baker Street Warehouse budget. Thank you so much. Thank
[28:38]
you, Juan. Thank you. Next. Speaker is polyterani.
[29:03]
All right. We could get your name and where you
[29:04]
live. Okay. My name is Polly and I live on
[29:09]
Ash Street in Alper Hill Ranch. And good evening commissioners.
[29:15]
Um, I'd like, I haven't done this in a long
[29:19]
time. Seems like I have to because when I turn
[29:22]
my back, then all this bullshit starts happening in our
[29:26]
area. So anyhow, I'll be direct. Any zoning change connected
[29:30]
to the Baker Street warehouse project is completely unacceptable. The
[29:34]
project has already been built as of right under existing
[29:38]
M1, M2, and OS zoning. The developers consultant told us
[29:43]
city staff. Requested the zone changes to M2 heavy industrial.
[29:50]
That was city staff that suggested that. None is required.
[29:55]
So if a zoning change appears now, it's not planning.
[29:57]
It's manufacturing a justification by city, staff after the fact.
[30:02]
And that exposes a city to spot zoning claims and
[30:05]
SQA violations because the EIR only analyzed impacts under curtains
[30:10]
zoning. But it's really bad. It looks bad. That the
[30:15]
city staff are the ones that said, Oh, to the
[30:18]
developer, Dan and the guys. Change zoning to M2. We
[30:23]
want it to be consistent. And they didn't take us
[30:25]
into consideration. We are immune people. Let's be clear. Changing
[30:29]
zones after approval breaks the city's own gurus. If violates
[30:34]
the good neighbor policy, it contradicts the city's commitment to
[30:37]
predictable land use planning and is directly harms, RMU neighborhoods
[30:43]
that relied on longstanding zoning when they bought our homes.
[30:48]
And any intensification, especially toward heavier industrial means, more trucks,
[30:54]
more noise, more emissions, more height, and more impact. None
[30:57]
of that was disclosed. None of that was analyzed. None
[31:00]
of that. Is justified. And plus. The
[31:10]
CUP. Probably said it wrong. Anyhow, it's 12, 000 or
[31:15]
1, 200 houses. And that's not going to happen. Um,
[31:21]
poulte and syntax have built fewer houses. So we'll have
[31:25]
to wait until Lansing company decides to build the apartment
[31:29]
complexes. And who knows when that would be. That's when
[31:33]
they'll have to pay to take care of the roads.
[31:36]
And Sharon and I came here in two thumbs. And
[31:38]
nine, I believe it was, or 10 telling you guys,
[31:41]
please do not change the certificate of Apoc up. Occupancy.
[31:51]
To 1200 because we'll never get the roads that we
[31:54]
were promised. And that's, I can't believe the roads. Anyhow.
[32:05]
There's zero legitimate planning basis for altering stable zoning for,
[32:11]
okay, I'm going to just close this with one last
[32:14]
six. Can I say it? You can finish. Okay. I
[32:18]
haven't done this in years. Excuse me. My legs are
[32:23]
shaking. I'm sorry. I'm having such a hard time. It's
[32:33]
so bad. Can you. Help me. Jane? Oh, I got
[32:37]
it. Here we go. Thank you. I will end by
[32:42]
saying converting M1 to M2 at the Baker Street site
[32:46]
is legally indefensible. Because it increases industrial intensity without general
[32:51]
plan justifications triggering new SECOA obligations create spot zoning exposure
[32:57]
violates reliance interest and contradicts the city's own compatibility process
[33:02]
policies. The city must reject the proposed M1 to M2
[33:06]
conversion to avoid significant legal and procedural risk. And the
[33:12]
legal risk in this one, buddies. Thank you. Thank you,
[33:15]
Polly. The next speaker is Sharon Galena.
[33:33]
Good evening. Sharon Galena. Ash Street, Albert Hill Ranch. Is
[33:40]
that a good enough? Yes. Okay. The M1 light manufacturing
[33:46]
is over often nickels right now. Which I don't, I
[33:52]
think that's good. Because light manufacturing has restrictions. Go to
[33:59]
an M2 allows intensified use. Allows noise and truck traffic.
[34:07]
I don't think Nichols can handle it. Right now, you
[34:10]
get on nickels coming home off the freeway. It's backed
[34:14]
up. All the way. How's the truck going to come
[34:20]
down there? And who wants to hear trucks at night.
[34:24]
None of us in Aberhil want to hear trucks at
[34:26]
night. M2, you don't know what you're going to get.
[34:29]
I hope we don't get boil heights over here. You
[34:33]
don't know. You could give, oh, what is it? Oh,
[34:39]
let's see. Better put my glasses on for this one.
[34:44]
Um, hazmat material. You don't know what's coming. Because M2
[34:49]
brings it all in. And people that bought houses, the
[34:56]
brand new houses. They paid up to 800, 000 dollars.
[35:01]
Who want an M2 behind them. Do you? You don't
[35:03]
live there. We all live over there. They don't want
[35:07]
to hear trucks at night. It was bad enough we
[35:10]
had to hear the mining at night when we first
[35:12]
moved in. So I guess that's it. That's it. I
[35:20]
guess I'll be back. Thank you, Sharon. The next speaker
[35:28]
is Karen Holder.
[35:39]
I'm Karen Holder. I live on elderwood street in Alperhill
[35:42]
Ranch. Anyway, I totally agree with my other two friends
[35:47]
over here. Um, I am against changing it from M1
[35:51]
to M2. I also, it was one of my first
[35:54]
concerns is to have another oil heights. The traffic. You
[35:58]
guys have not addressed the traffic. Um, that is one
[36:00]
of the biggest components. The noise pollution. We already have
[36:04]
air pollution. Um, from the freeways, the mines, the quarry
[36:09]
over here. And now we're going to add more intense.
[36:13]
And secondly, the noise. The noise, we have a quiet
[36:15]
community. I listened to birds in the morning. I listened
[36:18]
to birds at night. Um, I don't want to hear
[36:20]
beep. Beep throughout the, throughout the evening. So anyway, I
[36:24]
just want to put in. Please do not change the
[36:26]
zoning. That is my biggest concern. And then to address
[36:32]
the traffic. Thank you. Thank you, Karen. The next speaker
[36:41]
is Linda Sloan.
[36:53]
Hi, my name is Linda Slocum and I live on
[36:55]
Alderwood place. Can you just step forward a little bit
[36:57]
so we can hear you, let there. Okay. I'm sorry.
[36:59]
Okay. My name is my name is Linda Slocum and
[37:02]
I live on Alderwood plays. And when we originally bought
[37:05]
here in 2012, we were made a lot of promises
[37:08]
and none of them have come true. And now the
[37:11]
plan that you guys, that's being proposed is to me
[37:14]
absolutely outrageous and ridiculous. I do not want this zoning
[37:19]
to change for one. This is supposed to be a
[37:22]
residential community. So please, please do not approve this. And
[37:28]
the traffic situation is horrible. And we were promised back
[37:31]
in 12 that that was also going to be fixed
[37:34]
at that nickels was supposed to be expanded. Lake was
[37:36]
supposed to be expanded. And none of those plans have
[37:38]
come through. So why would we expect anything different on
[37:41]
this. Thank you. Thank you, Linda. The next speaker is
[37:51]
Jennifer Douglas.
[38:03]
My name's Jenifer Douglas. I live on Alderwood in Albert
[38:06]
Hill community. Again, as the few people that have come
[38:10]
before me, we were promised many different things when we
[38:14]
bought the homes and even the new homeowners going in
[38:17]
now had no idea that these warehouses were even going
[38:20]
to be developed. So the fact that again, you guys
[38:23]
are changing the zoning should not be happening. The traffic
[38:26]
has yet to be addressed on both of them. We
[38:29]
saw the traffic issues at the fullest extent when we
[38:32]
had the poppy bloom. People couldn't get in and out
[38:34]
of the city. We were actually not even able to
[38:36]
alleave our homes during that time because you could not
[38:39]
go down lake or nickels, which was our really the
[38:42]
only entrances. So again, you need, please do not approve
[38:46]
this. Thank you. Thank you, Jenipyr. The next speaker is
[38:54]
Patricia Ponzo. Can you hear me? Yeah.
[39:05]
My name is Patricia Ponzo. I live on ash in
[39:08]
Alberhill Ranch. I'm here tonight because I'm concerned about the
[39:12]
proposed make a warehouses on Nichols Road. And I'm asking
[39:16]
you to please think about what this project will mean
[39:19]
for the people who live here. Why? Because I live
[39:25]
here. I drive Nichols Road. And if you've ever tried
[39:27]
to get through Nichols around four o'clock in the afternoon,
[39:30]
you know exactly what I'm talking about. You don't. You're
[39:34]
the one that talked about our traffic. No, you don't
[39:37]
have any idea what it's like. The traffic can already
[39:44]
be backed up across the freeway and into the new
[39:47]
neighborhood. And that's going in one direction. The other direction
[39:50]
is backed up way past the electrical power there by
[39:54]
Baker Street. In fact, I've learned to change the time.
[39:57]
I leave my house just to avoid that. And remember
[40:01]
that's just the traffic that we have now. Add on
[40:06]
about 1, 900 additional vehicle trips every day. With all
[40:11]
those trucks, it's going to be a mess. So I
[40:14]
have a simple question. Where are the tricks going to
[40:17]
go. And from what I understand, there's no plan to
[40:21]
widen the road. Is that still true? You're not saying
[40:26]
anything. To wind the road to accommodate all this additional
[40:30]
traffic. So what are you going to do? What are
[40:33]
you going to do about the congestion? What are you
[40:36]
going to do about the diesel exhaust? What are you
[40:38]
going to do about the noise. What are we going
[40:40]
to do about the safety of the people that live
[40:43]
in our neighborhoods. Because once these warehouses are built. We
[40:49]
can't just unbuild them when we discovered that the traffic
[40:52]
was unbearable. Finally. I want to remind you that we
[40:59]
aren't just numbers on a traffic study. Where your residents.
[41:05]
We live here. We're your neighbors. And yes, we're also
[41:09]
your voters. So please don't just listen to our concerns,
[41:14]
nod your heads and send us home. Please do something
[41:17]
about it. Thank you. Thank you, Patricia. The next speaker
[41:25]
is Orcadia Wilcox. Good afternoon. Orchidea Wilcox. I'm a local
[41:34]
resident. Um, this seems to be like a contradiction of
[41:40]
what the city of Lake Aussinor is supposed to be.
[41:43]
It's supposed to be an extreme sports city, non -
[41:46]
industrial city. So this is going to, again, the goals
[41:50]
of the city. Like they were mentioning, you know, the
[41:54]
pictures are very nice with three or four cars. I
[41:56]
don't see all the tracks that are going to be
[41:57]
coming and going. I don't see the pollution. That's going
[42:01]
to be creating. I don't see all the noise that's
[42:04]
going to be creating. That in a picture looks very
[42:07]
pretty, but that's not a reality. Let's be clear. The
[42:10]
grid. The water usage, the congestion on everything that is
[42:16]
going to be happening is not showing on those pictures.
[42:19]
The fire haser. You know, a big workhouse like that
[42:24]
can catch on fire 300 feet from a neighborhood. That's
[42:28]
not safe. Um, right now we don't know for sure
[42:32]
what it's going to be there. And you cannot promise
[42:34]
what is going to be there. It could be a
[42:36]
data center pretty soon using all the water from lake
[42:39]
else, you know. 9 million, the little bit of money
[42:44]
that this project can bring. It would not pay for
[42:48]
the usage of the water, the electricity, the air pollution,
[42:53]
the noise pollution, the light pollution of the residence of
[42:56]
lake calciner. We need to support the residents. You know,
[43:01]
it's very nice for some people that live somewhere else.
[43:04]
They want to have a job. But, you know, the
[43:07]
people that count and the people that you represent are
[43:09]
the people that live here. Not that people are coming
[43:11]
to work. Um, I am against the change from M1
[43:19]
to M2 because the expansion that you're going to create
[43:24]
cannot be controlled after you do that. It will be
[43:28]
irreversible. And the damage will be reversible. The little effort
[43:33]
that they will put for a little bit of contribution
[43:36]
for the ecosystem does not pay for all the acres
[43:39]
that they're going to be creating against it. A little
[43:45]
bit of money for the school. Please do not sell
[43:47]
the city of Lake Helciner for just a little bit
[43:51]
of change. This will bring 1900 new daily vehicle trips,
[43:59]
1500 to 1700 daily trips on the I - 15.
[44:02]
And even though I don't live off nickel, I have
[44:04]
to travel on the 15. I don't hear anything about
[44:07]
enlarging. Uh, every day you have to pay coming from
[44:11]
Riverside 14 dollars and you still for 15 miles you
[44:14]
take an hour. Uh, there's no change for that. We
[44:18]
live here, uh, we don't want to have all this
[44:21]
congestion. It's not safe. It's not good. You cannot promise
[44:25]
that this is going to be good for the city
[44:27]
of Lake Kelsinger. Please protect the neighbors, protect the people
[44:32]
that put you on your opposition. Thank you. The next
[44:39]
speaker is Brianna Wilcox. Evening commission, my name is Brianna
[44:44]
Wilcox. I'm a local resident. I'm also a proud union
[44:47]
baby. I'm proud union member myself when I worked as
[44:50]
a teacher. The thing is when you work as a
[44:52]
teacher, you see how the living conditions of your students
[44:55]
affects them. My kids are sick. Over a riverside because
[45:00]
of all the warehouses that they've just been throwing in.
[45:03]
My family's are sick. The congestion is unbelievable. They can't
[45:07]
sleep because of the sound and smog and noise pollution,
[45:11]
noxious chemicals. We're already getting chronic health conditions for kids
[45:15]
who aren't even ten yet. Let alone the rest of
[45:18]
their family. Like the people who live here. I don't
[45:23]
know if you know what it feels like to be
[45:25]
trapped in your neighborhood because of the freeway is clogged.
[45:28]
When the wildfire coming. I don't know how close you
[45:31]
live here. I'm sure that can be looked up, though.
[45:34]
If you bring in what is already congested and what
[45:37]
is already a safety hazard. You're just saying you want
[45:40]
us to die in a fire. You're just saying you
[45:43]
want, are you tell you to go up because water's
[45:46]
being used? Electricity is being used. With rigorous safety standards,
[45:49]
from so - called Edison, the same sulka, Aldison, that
[45:52]
caused the eaten fire, right? And never got accountability for
[45:54]
it. Those standards. That's what you're planning for this community.
[45:59]
That's what you're planning for these families. They don't get
[46:01]
to sleep. They don't get to breathe. They don't have
[46:04]
a safe way out. For what. Some temporary construction jobs.
[46:09]
And then terrible warehouse jobs. We don't even know who
[46:12]
the buyer is for this warehouse. Who is it? Who
[46:15]
is paying so much money that they want to profit
[46:17]
off of this community. They're not telling us probably a
[46:21]
good reason why. I was here for the city council
[46:24]
meeting. Well, past series of city council meetings because we
[46:28]
were trying to fight an AI data center that didn't
[46:30]
say was a data center. It just wanted to be
[46:32]
rezoned for industrial use. So who's buying here? Is it
[46:36]
a data center? Is it Amazon. Is it the same
[46:39]
warehouse conglomerates that force their workers to pee in a
[46:42]
bottles because they don't want them to take 15 minute
[46:43]
bathroom breaks. The ones that pay barely minimum wage. No
[46:49]
vacation time. No real health care for when they get
[46:52]
injured at way above industry standards and averages. You want
[46:57]
to sell us out for crappy jobs that hurt us
[47:00]
for air that poisons us. You want to ruin these
[47:01]
families'lives. I appreciate this has been many years in the
[47:05]
making. But then I wonder, why has this been so
[47:07]
many years in the making without our input. We are
[47:11]
the ones who are going to bear the true cost
[47:12]
of this. And I'm wondering, why would city stuff wish
[47:15]
this through open you to litigation. Trying to justify things
[47:19]
after the fact? Where's that money going? Because we're not
[47:22]
seeing it. A couple of acres for conservation is not
[47:25]
going to mitigate every risk that this represents. And I'm
[47:32]
sorry that I'm upset. But it's because I care. I
[47:36]
don't want any more kids sick. I don't want any
[47:38]
families trapped in a wildfire. You live here, you belong
[47:42]
here too. Please vote like it. Thank you.
[47:52]
The next speaker is Andrew Molina.
[48:05]
The next speaker after Andrew Molina will be.
[48:21]
You guys hear me? Alright, good evening everybody. My name
[48:24]
is Andrew Melling and I'm a representative with the Western
[48:27]
States Regional Council of Carpenters here in Riverside County, representing
[48:30]
over 6, 100 members, countywide. And several of them live
[48:35]
in and around this area. We're here to speak in
[48:39]
favor of the project, not only because of the job
[48:41]
opportunities it's going to bring, but also because the developer
[48:44]
has committed to using responsible local contractors that will pay
[48:48]
an area standard wage, a livable wage, and higher apprentices
[48:52]
from a state accredited apprenticeship program. Thank you. All right,
[48:57]
thank you Andrew. The next speaker is Louis Briges.
[49:07]
The next speaker is Saugaytan. The next speaker is Ruth
[49:17]
Bryson.
[49:28]
Good evening. My name is Ruth Brissonden from Stand Up
[49:33]
for Mother Earth. I also live in Tumisco Valley just
[49:36]
up the road from this proposed project. As I'm sure
[49:41]
you're aware, this project cite is home to several populations
[49:44]
of the rare and endangered San Diego Ambrosia, which will
[49:49]
be negatively impacted by this project. In 2002, San Diego
[49:55]
Ambrosia was listed as an endangered species under the U.
[49:58]
S. Endangered Species Act. In 2010, the U. S. Fish
[50:03]
and Wildlife Service at a critical habitat for the San
[50:06]
Diego Ambrosia to the listing. This designation of critical habitat
[50:11]
created subunit 1B consisting of about 70 acres in the
[50:15]
area around Nichols Road where this project has located. The
[50:20]
designation of critical habitat stated that this subunit is essential
[50:24]
to the conservation and genetic diversity of this species. San
[50:30]
Diego and Brosia is found only in a few places
[50:33]
in the world. It's found in limited numbers only here
[50:36]
in Riverside County, San Diego County and Baja, California. The
[50:40]
parcel upon which the proposed project sits contains at least
[50:44]
eight different populations of this endangered plant. All of which
[50:50]
are slated to be removed and then transplanted in the
[50:53]
conserved area. The area is already under conservation. So how
[50:59]
is this new mitigation? Anyway, none of the endangered ambrosia
[51:04]
at this site will remain in its natural location. All
[51:08]
will be dug up and all will be removed. Hopefully
[51:11]
some will still survive. The FEIR seems to twist the
[51:16]
language at the MSHCP to justify their removal of all
[51:20]
of the ambrosia under rationale that since 90 percent of
[51:24]
the population cannot be avoided, then none should be avoided.
[51:28]
Does that make sense to you. At least some of
[51:31]
the ambrosia should remain in situ to maximize the chances
[51:36]
of its survival. Translocation should complement, not replace full protection
[51:43]
measures for the ambrosia. It's possible that a downscaled project,
[51:49]
such as that proposed under alternative number three, the reduced
[51:52]
project alternative described in the draft EIR could avoid at
[51:58]
least some of the ambrosia. Some would be avoided, some
[52:01]
would be translocated, offering the best chance for survival for
[52:05]
this rare and dangered native plant. This would also satisfy
[52:11]
the primary project objectives due to the similarity in the
[52:16]
development type design use and location. I urge you to
[52:23]
either reject this project in whole or adopt alternative three
[52:29]
instead of the project as proposed. Thank you. Thank you.
[52:32]
Red. The next speaker is Ace Vallejos.
[52:47]
Good evening. I'm Ashed Vallejo, and I wanted to go
[52:50]
ahead and speak in opposition to what is currently planned.
[52:54]
M1. M2 is okay. I don't think any of us
[52:57]
are against any development in the area. I think, also
[53:01]
if you take a look at the RMU zoning, all
[53:04]
that zoning allows jobs. Those jobs are very well paying
[53:08]
jobs. I know people that work in those light manufacturing
[53:10]
in our area and they make a substantial salary. So
[53:14]
I don't see where that's an issue. Uh, getting out
[53:18]
on Nichols Road. And over the Lake Street or over
[53:22]
to the Nicholson ramp. It's terrible. There's just no, it
[53:26]
just doesn't even make any sense. In fact, cloud chair
[53:30]
and RCTC have no plans right now to do anything
[53:33]
with that on - ramp or widening or anything like
[53:36]
that. I believe they're working on central now. And there's
[53:39]
no scope or work being moved forward on nickels. Nichols
[53:44]
eventually, I understand El Toro will come in and merge
[53:48]
in with the rest of it there. So that's a
[53:51]
long ways off before that ever gets done. The bottom
[53:54]
line is as compatible development. Something that's compatible with the
[53:58]
houses compatible with the neighborhood. And I think that that
[54:01]
would be light manufacturing would be fine. It'd be nice
[54:04]
to have a hospital. It'll be nice to have a
[54:07]
life city college or something like that. But what you're
[54:10]
proposing now is incompatible. It doesn't make any sense. Thank
[54:13]
you. Thank you Ace. The next speaker is Michael Moran.
[54:26]
I'm fairly new to the area. I'm one of the
[54:28]
people that moved in recently that had no idea about
[54:30]
the warehouses, you know, real estate agents. They don't tell
[54:33]
you those things. So anyway, the reason I came up
[54:38]
is I had a question. You had a slide of
[54:41]
slide up there about transportation. You go to slide during
[54:44]
your presentation about transportation. Could you answer? I had a
[54:48]
question about that.
[55:01]
So this makes your project look really good. And if
[55:03]
I wanted to make my project look good, I'd do
[55:05]
a slide just like that. I'm going to have to
[55:11]
sit down. Um, yeah, this is a great slide. If
[55:17]
I wanted to make my project look good, I do
[55:19]
one just like this. My question, I couldn't read the
[55:22]
axes. So what's the baseline? I see that that increase
[55:26]
is very light. But what is baseline and in a
[55:32]
percentage basis? How much does that increase the percentage of
[55:36]
traffic? Do we have an idea about that. I can't
[55:39]
answer. That. Anybody. And whatever that percentage increase is have
[55:49]
plans been made, as many people have brought up, to
[55:53]
address the logistics around the area in order to make.
[55:58]
The traffic be reasonable. And I didn't hear anything in
[56:03]
the presentation along those lines in terms of anything that
[56:06]
was going to be done to address that. Um, I
[56:09]
do think, I'm all for more jobs. I think the
[56:13]
jobs are great. Um, but the good jobs are temporary.
[56:17]
This is a warehouse. And those warehouse jobs I know
[56:20]
from experience, um, are not the greatest jobs. And the
[56:26]
safety issues that have been brought up are very real.
[56:29]
Um, so I just wanted to make those points. Um,
[56:32]
and, uh, I'm in agreement with the project not going
[56:37]
forward as it is until some of these issues are
[56:39]
addressed. Thank you. Thank you. The next speaker is Andre
[56:48]
Masuzov. Hi everyone. Oh, that's nice. Um, so
[56:59]
I stand against the licensing change from M1 and M2.
[57:04]
To M2. And also I wanted to speak as a
[57:06]
person who lives in the new KB home community that
[57:10]
was recently built and still in the process of building.
[57:14]
Our home, myself and my families and also a home
[57:17]
of my neighbors who also have families and the young
[57:20]
children will directly oversee the proposed construction proposed baker street
[57:27]
project. I think it's going to one negatively impact the
[57:31]
air quality, the water quality, the overall look of the
[57:34]
area. There is a, I would say big outbreak hill
[57:39]
range community and also including this AB home project or
[57:43]
large community that has kids. A lot of children actually.
[57:49]
It has a school up the hill that will also.
[57:54]
Certain issues in terms of air quality that this project
[57:56]
will bring. Um, this is a nice presentation, but I
[58:01]
do think that for debt area specifically, there are many
[58:04]
things that can be done from the city side that
[58:07]
can actually improve people's lives there. And instead of building
[58:11]
this project, um, I stand not only against the license
[58:14]
change, but also against the project in general. I think
[58:17]
again, there is much better use of that length in
[58:20]
that area. Um, yeah, that's all. Thank you very much.
[58:31]
Next speaker is Cassandra Madison.
[58:46]
Good evening, commissioners. My name is Cassandra Madison. And I
[58:49]
am here to Lake Elsinor resident. Concerned about the Baker
[58:53]
Street warehouse project. I am not opposed to economic development.
[59:00]
But development of this size must provide benefits that are
[59:03]
clear, measurable and enforceable. We renaced to approve more than
[59:08]
one million square feet of industrial development potentially operating 24
[59:13]
hours a day, seven days a week with substantial daily
[59:17]
truck traffic. At the same time, the environmental review acknowledges
[59:23]
significant and unavoidable air quality and greenhouse gas impacts. So
[59:28]
my first question is simple. What guaranteed benefit to the
[59:32]
people of Lake Elsinor is substantially enough to justify accepting
[59:36]
environmental impacts that cannot fully be mitigated. I also want
[59:41]
clarity on the economic benefit. How many permanent jobs will
[59:45]
actually be created at this facility? How many are expected
[59:49]
to go to Lake Elsinor residents? What wages are anticipated?
[59:54]
And most importantly, what direct tax revenue will this project
[59:57]
generate for our city. Regional economic projects are not the
[1:00:01]
same has guaranteed local benefits. I also want to know
[1:00:04]
who pays for the infrastructure this project requires. Road improvements
[1:00:09]
sewer facilities, utilities, traffic, mitigation and other infrastructure connected to
[1:00:15]
this development should be paid for by the developer. Lake
[1:00:19]
Elsinor taxpayers and rapes should not be asked to subsidize
[1:00:23]
the long - term costs of private development. And finally,
[1:00:28]
we do not yet know who the tenant will be.
[1:00:31]
If this project can operate 24 hours a day and
[1:00:33]
accommodate a range of industrial uses, then the strongest protections
[1:00:37]
need to be established now before approval, not negotiated later
[1:00:42]
after a tenant arise. That includes enforceable truck routes, idling
[1:00:48]
restrictions, nor is protections, environmental monitoring, infrastructure responsibilities, and consequences
[1:00:54]
for noncompliance. I ask you to evaluate this project not
[1:00:58]
only on what is being promised tonight, but on what
[1:01:00]
the city will actually be able to enforce 5, 10
[1:01:03]
or 20 years from now. Responsible development should pay its
[1:01:07]
own way, protecting the surrounding community and provide benefit, proportionate
[1:01:13]
to the burden it creates. Please make sure these commitments
[1:01:16]
are enforceable and not simply projected. Thank you. Thank you,
[1:01:21]
Cassandra. Next speaker is Elliot Ruland.
[1:01:38]
Hi everyone, my name's Elliot. I'm a new resident here.
[1:01:41]
I live in the KB community. Um, like the gentleman
[1:01:45]
that was up here for moments ago. Uh, I moved
[1:01:48]
in last year and had no idea that we'd be
[1:01:50]
getting a warehouse built right next to us. Um, you
[1:01:54]
know, one of the things that I really liked about
[1:01:56]
Lake Elsinor is it's a beautiful area. I can walk
[1:02:00]
outside my front door and see the mountains and the
[1:02:02]
greenery. And it's really beautiful. I see it as a
[1:02:04]
place that can grow and develop to a place where
[1:02:07]
people want to come and live here and to come
[1:02:08]
visit. Um, I don't think warehouse, uh, makes it look
[1:02:12]
any more beautiful. Um, I think it makes it look
[1:02:15]
quite bad actually. Right. Um, climate is important to me
[1:02:19]
as well. And when we are going to be inviting,
[1:02:22]
um, you know, semi trucks to be driving on our
[1:02:25]
already two small streets, right? Polluting the air. There's kids
[1:02:29]
in my neighborhood. There's a, I think an elementary school
[1:02:32]
pretty nearby as well. Um, I just don't think that
[1:02:35]
that's the right choice. We can, we can develop the
[1:02:37]
land and bring things in that will be beneficial for
[1:02:39]
the community. Uh, I don't think this is broadly beneficial
[1:02:42]
for the community. Um, and then as far as the
[1:02:45]
roads, I was commuting up the 15 for quite a
[1:02:49]
while. Um, after I moved here. And sometimes just to
[1:02:53]
get on the freeway at Lake Street would take me
[1:02:55]
like 25 minutes coming from, uh, that KB community nickel
[1:02:59]
streets is a disaster. It doesn't even have street lights.
[1:03:02]
It curves. You can't even, you can barely see it
[1:03:04]
night. You know, I'd like to see, um, our tax
[1:03:07]
dollars going towards improving the city for the residents that
[1:03:10]
are here. Um, not to, uh, you know, help out
[1:03:14]
a big business or a corporation come in and take
[1:03:16]
our land and put something there that no one really
[1:03:19]
wants. So I hope that you, um, you listened to
[1:03:22]
everyone and make a choice that benefits the community and
[1:03:25]
not, uh, whatever company happens to come in. Who knows.
[1:03:29]
Maybe we'll find out. Uh, when it actually opens. Thank
[1:03:31]
you. Thank you, Aliyek. The next speaker is Harley Quinn
[1:03:37]
Flint. Hello.
[1:03:48]
Everyone. My name is Harley and I'm a resident of
[1:03:52]
Lake Elsinor as well as a small business owner here.
[1:03:55]
This is my first time speaking publicly. So please bear
[1:03:59]
with me. I also did not necessarily plan to speak
[1:04:04]
tonight. I just got off of a very long day
[1:04:06]
of work. So, um. Please enjoy my bullet points. Um,
[1:04:11]
so I am, again, I'm here today as a resident
[1:04:14]
and a small business owner. I run a mobile service
[1:04:17]
operating from Temecula through Corona, but most of my clients
[1:04:21]
are right here in Lake Alsinore. I drive through Lake
[1:04:24]
Street in Nickel Street almost on a daily basis. As
[1:04:27]
a mobile dog groomer, I aim to provide services of
[1:04:29]
care to my community. And I'm working every day to
[1:04:32]
find more ways I can be involved and act to
[1:04:34]
improve my city. That being said, I speak with my
[1:04:40]
clients about their thoughts on the city and their needs.
[1:04:43]
Many of them has expressed opinions over the years of
[1:04:46]
the condition of, um, one, the traffic. But also generally
[1:04:52]
how they've been made promises as they were moving in
[1:04:55]
to have a beautiful city, some of the most gorgeous
[1:05:00]
scenery going through Lake Street, for example. And, um, they
[1:05:04]
feel like that's not being met. Um, and having a
[1:05:10]
zone change from an M1 warehouse to an M2 would
[1:05:14]
be even worse of a change. Also, as a resident,
[1:05:23]
I was here for the Macy fire. My mom has
[1:05:27]
a very severe breathing condition. And as an animal lover,
[1:05:32]
I also have 10 pets. Definitely not all furry. You
[1:05:35]
know, we've got some toads in there. But, um, it
[1:05:39]
took us 10 hours to evacuate our animals. And that's
[1:05:43]
not including the traffic. That's not, um, that's not even
[1:05:48]
including the trips back and forth from different boarding facilities,
[1:05:52]
finding a place for us to stay while the air
[1:05:57]
quality was so horrible. Now I am fearful of the
[1:06:02]
next time that we have to evacuate. Because while we've
[1:06:05]
made plans just in case, I want to make sure
[1:06:09]
that my family can get out safely. And there's only
[1:06:14]
so many people and animals you can fit into one
[1:06:18]
or two small vehicles. Um, and so having to take
[1:06:22]
multiple trips, knowing how atrocious the traffic already is. Again,
[1:06:27]
as a mobile business, I have to sit through it
[1:06:30]
every day. Um, I am deeply, deeply concerned. Uh, so
[1:06:36]
please don't change the zoning. Thank you. Thank you, Harley.
[1:06:44]
The next speaker is David Noblet. Good evening, commissioners and
[1:06:51]
city staff. Thank you for this venue to point out
[1:06:54]
and make comments to, uh, to this project. So a
[1:06:57]
few, first of all, I do live in South Corona,
[1:07:00]
so I don't live in the city, but I do
[1:07:01]
have a lot of the same. Traffic challenges that, you
[1:07:05]
know, residents in the city like elsewhere do. So we're
[1:07:07]
not toned up to that. So a few things to
[1:07:10]
point out. The site already does have M1 and M
[1:07:13]
zone. M2 zoning on the site. And so that's existing
[1:07:19]
already there. It is just to create a consistency of
[1:07:22]
zoning. Um, and what that does is it allows for
[1:07:26]
an M2 zoning. It allows a more larger breath of
[1:07:30]
users that have manufacturing uses higher paying jobs. Tech industry
[1:07:34]
jobs to come in and actually operate and facilitate those
[1:07:37]
buildings. Um, couple things also. Projects like this. Are the
[1:07:43]
backbone of infrastructure for cities in the inland empire. They
[1:07:46]
pay for the fire department such as this project is
[1:07:50]
road streets bridges cities general fund. And so when you
[1:07:53]
have a city, you know, that has a lot of
[1:07:55]
residents and commercial, but not a lot of industrial. It's
[1:07:59]
hard to get, you know, to offset those costs. Um,
[1:08:01]
this project is really showing one of the very, very
[1:08:06]
few industrial zone areas inside the city of Lake Elsinor.
[1:08:10]
Um, and so, you know, the city or Temescal canyon,
[1:08:13]
county land has industrial projects that they're going to benefit
[1:08:16]
from those dollars. But inside the city of Lake Elsednor,
[1:08:19]
the handful of projects that actually can, you know, reap
[1:08:22]
the benefit of that. And so, you know, one of
[1:08:24]
the gentlemen had mentioned that he was driving to Riverside
[1:08:27]
up north to the 15, um, every day for work.
[1:08:31]
Well, the idea is when you have it a warehouse,
[1:08:33]
when you have a manufacturing facility in your own city,
[1:08:37]
there's presence that will no longer have to commute up
[1:08:40]
the freeway or down the freeway. Temecula, I grew up
[1:08:43]
in specula. Temacula, Lake Elsinor, Minifee, that whole canyon, everybody
[1:08:48]
drives out. And so, you know, you either drive to
[1:08:51]
San Diego, Orange County, Riverside County, or Los Angeles County.
[1:08:55]
With projects now in the inland empire, um, as a
[1:08:58]
whole, and good skilled labor jobs, um, medium labor and,
[1:09:02]
you know, high intensity labor jobs. We are now bringing
[1:09:05]
our residents back home more time with their families, less
[1:09:08]
time on the roads. So thank you for your time.
[1:09:10]
Appreciate it. Thank you very much. The next speaker is
[1:09:15]
David O'Malley. Good evening.
[1:09:25]
Hopefully I can bring a positive end tonight's presentation. I
[1:09:29]
have kind of a weird hobby or liking. I am
[1:09:33]
very interested in land planning. And I really like to
[1:09:36]
see projects like this one tonight in front of you
[1:09:38]
that are well planned and are designed for a site
[1:09:42]
and situation. I've looked at the exhibits. I've looked at,
[1:09:45]
I've spoken to the applicant. And this is one of
[1:09:47]
a kind. Um, it isn't going up the five freeway
[1:09:50]
in grapevine and seeing a big box with a sign
[1:09:52]
on it. Very sensitive, well - negotiated. You hear the
[1:09:57]
word impact. There's a lot of good impact that this
[1:10:01]
property brings. This application brings. It's a great investment. Um,
[1:10:05]
I thought I heard nine million dollars with a roadway
[1:10:07]
improvements. That's well done. School fees for an industrial site.
[1:10:13]
Well done. Conservation mitigation and banking. Well done. I don't
[1:10:17]
think I've ever heard that before in all my years
[1:10:20]
in this business where a industrial design and application actually
[1:10:26]
is sensitive toward the environment. So, um, impact can be
[1:10:31]
good. And I think impacts will be very good on
[1:10:34]
this particular application and a great addition to your city.
[1:10:37]
Thank you. Thank you very much. We did have one
[1:10:42]
last speaker request come in. It is Brianna Sora.
[1:10:54]
Hi. Everyone. You can pull it down so we can
[1:10:57]
hear you a little bit. Thank you. Um, hi everyone.
[1:11:00]
My name is Brianna Sarah. I'm here to oppose the
[1:11:03]
Baker Street Mega Warehouse. Actually a, I've been living here
[1:11:06]
my whole life. I grew up in Lakeyesnor. I moved
[1:11:09]
to Orange County. I went to undergrad over there. I
[1:11:13]
went to grad school and I recently came back and
[1:11:15]
I purchased a home in the terracena community. And I
[1:11:19]
love Lake Elsinor. I never thought I would say that.
[1:11:24]
Growing up, I remember always wanting to leave just because
[1:11:28]
I felt like we were such a small town, but
[1:11:30]
coming back in saying how big and how much it
[1:11:33]
has expanded and the growth, I wanted to move back
[1:11:36]
and just stay here. So when I learned about the
[1:11:41]
mega Baker Street Make a Warehouse, I was pretty upset
[1:11:44]
just because I felt like we can't be just wasn't
[1:11:48]
transparent. I also remember coming to the planning commission meetings.
[1:11:53]
And I just felt like there was also a lack
[1:11:54]
of transparency there as well. I also feel like the
[1:11:57]
city council hasn't really represented us as residents. Um, and
[1:12:01]
I feel like we're just being sold to the mega
[1:12:05]
companies and to kind of address someone else's comment about
[1:12:09]
how these make a warehouses are going to create jobs.
[1:12:14]
A lot of people who have, for example, for me,
[1:12:17]
this will not be a good job for me. This
[1:12:18]
is not sustainable. I cannot live on this type of
[1:12:22]
outwardly wage job. And I also don't want my health
[1:12:26]
impact to be impacted while it's a concern for if
[1:12:29]
I ever want to have children. If they're going to
[1:12:31]
have any health issues just due to the proximity of
[1:12:33]
the mega warehouse. So I want to concern by the
[1:12:36]
fire hazards. Um, like I said, I, my family husband
[1:12:40]
here for a very long time. And I have seen
[1:12:42]
those wild fires and they're very, very scary. And the
[1:12:46]
traffic is already so terrible on the Nichols road. And
[1:12:50]
if it's not going to be widened, that's a very
[1:12:51]
concerning because there's a lot of residents that not just
[1:12:55]
live in the Albrecht, but they also live, um, Mac
[1:13:00]
Baker area. We also have the residents that label on
[1:13:03]
the other side of the lake. Those are a lot
[1:13:05]
of residents. And I feel like you guys need to
[1:13:08]
address our concerns first prior. To moving forward with this
[1:13:14]
project. Because right now I feel like this is not
[1:13:18]
acceptable and it's not really compatible with the surrounding area.
[1:13:22]
Thank you. Thank you. Could includes the speakers for tonight.
[1:13:31]
Sorry. Was that concludes the speakers for chat? Yes. I
[1:13:34]
know we have the pleasure of having, um, a representative
[1:13:37]
of traffic with us tonight. I don't know if you're
[1:13:39]
prepared or interested in addressing any of the items of
[1:13:43]
concerns of the community.
[1:13:57]
All right. Sorry for John's spot there. Oh, no worries.
[1:14:01]
Uh, yeah, good evening, Chair and Commissioners. Happy to be
[1:14:05]
here with you tonight. Um, so obviously I'm Paul. I'm
[1:14:09]
the senior engineer here with the city of Lake Elsinor.
[1:14:12]
So obviously we recognize the congestion down the nickels road
[1:14:17]
area. And so there is an overall city plan to
[1:14:21]
help out with the congestion in the area. Um, baker
[1:14:24]
is one piece of that. So bakers are obviously going
[1:14:27]
to install the intersection improvements at nickelsroad and baker. And
[1:14:31]
then they're going to do the realignment as Dane was
[1:14:33]
discussing earlier. And then they also, um, that includes a
[1:14:37]
signal. And they'll also be building out peer street. So
[1:14:40]
that'll provide a nice connection for the community over there
[1:14:42]
as well, uh, to have a quicker route to the
[1:14:45]
interchange. On top of that, they're obviously contributing the 9
[1:14:49]
million dollars. Sorry, let me fix this. On top of
[1:14:53]
that, they're contributing 9 million dollars. So that really provides
[1:14:55]
the city with flexibility, um, to construct additional improvements in
[1:15:00]
the area. Uh, as we see, you know, congestion, uh,
[1:15:06]
as we see it develop. On top of that, you
[1:15:08]
may remember, call your retail shops. They actually got conditioned
[1:15:12]
to construct the signal at Collier Avenue at Nichols Road.
[1:15:16]
So that is in final design right now. And that
[1:15:19]
will be constructed. Within the next, you know, year or
[1:15:22]
so here. And addition to that, we are working with
[1:15:26]
a master developer of the Albert Hill Ranch area. And
[1:15:29]
so, um, he has a lot of projects down the
[1:15:32]
pipeline in this area. Right now they're actually progressing. The
[1:15:35]
conceptual design of changing nickel's road to a foreign lane
[1:15:39]
road. So that is in the works as well. Um,
[1:15:43]
and on top of that, the city has the nickel's
[1:15:46]
bridge and interchange project that's currently going through the environmental
[1:15:49]
document. So there's a lot of things playing on in
[1:15:54]
the background aside from just what you see in the
[1:15:56]
conditions here. So I think that that will really help.
[1:15:59]
But obviously, you know, improvements take time. And so a
[1:16:03]
lot of these do have some environmental components such as
[1:16:06]
the interchange. So. In my mind, that's the big picture
[1:16:10]
of how everything will develop here over time. Thank you
[1:16:16]
very much. All right. Um, do any commissioners have questions
[1:16:22]
for staff or wish to make any comments. To be.
[1:16:30]
Able to lane. Girls. Now we're talking. Five years. 10
[1:16:33]
years. 30. So realistically, it's all tied to, if there
[1:16:41]
is any environmental, um, if there's none, it could be
[1:16:46]
three years, like anticipated window when that could come in.
[1:16:50]
So right. Now. KD home.
[1:17:02]
Madam chair, I think the way this is supposed to
[1:17:05]
work. Is that we have a public comment substitute, but
[1:17:08]
we usually don't engage in a debate in this way.
[1:17:10]
So if anyone would want to talk to our traffic
[1:17:14]
engineer afterwards, it certainly would be available to do that.
[1:17:17]
All right. Thank you. Commissioners, any questions. Of staff. No.
[1:17:27]
Um, I would like to say that, um, I want
[1:17:30]
to acknowledge, um, everybody for coming out and addressing your
[1:17:33]
concerns, um, your support for the project. It's good for
[1:17:38]
us to hear from the community. Um, I understand why
[1:17:41]
project of this size, um, particularly one involving warehouse operations
[1:17:46]
and traffic generates concerns within the community. Our responsibility here
[1:17:52]
is a planning commission is to evaluate the project based
[1:17:55]
on the city's general plan, the municipal code, environmental review.
[1:18:01]
Project design and the conditions that we have the authority
[1:18:06]
to impose, which there are several conditions in their conditions
[1:18:09]
of approval for this project. So. Um, you know, I
[1:18:14]
want to say we hear you, but that's what our
[1:18:18]
role is here as the planning commission. So if we
[1:18:20]
don't have any other, uh, commissioner's comments, uh, declare, sorry,
[1:18:29]
first of all, I appreciate the passion that was brought
[1:18:31]
out here tonight. This is part of what I love
[1:18:32]
about the lake housenor community. And there was a lot
[1:18:35]
of great points that were made all well taken and
[1:18:40]
noted, um. A couple of the comments were, well, you
[1:18:45]
need to address our concerns. Um, I'm not going to
[1:18:49]
sit here and address them point by point. But I
[1:18:51]
can say that I've been to, uh, the community outreach
[1:18:56]
that the developer has put on multiple times, not to
[1:18:59]
hear the same boring presentation, but to talk to the
[1:19:03]
community members who did come to the outreach. And so
[1:19:06]
I know the passion in this room right now. And
[1:19:09]
a lot of voices, but there's this discussion has been
[1:19:12]
going on for a while. And there are a lot
[1:19:14]
of other voices who have opinions as well. Um, that
[1:19:17]
being said, you know, some of the concerns that I
[1:19:19]
heard we didn't know that, uh, it was industrial. But
[1:19:24]
it's, it's been industrial. Um, and in fact, part of
[1:19:28]
it is already M2. I'm personally in favor of larger
[1:19:34]
industrial buildings as opposed to smaller. You have the ability
[1:19:38]
to have more structured and strategic. You're going to have
[1:19:42]
those trucks if it's industrial. And we have a bigger
[1:19:45]
warehouse. You have one user who they don't want to
[1:19:47]
sit with the cars either. They're going to be more
[1:19:50]
strategic on how they're scheduling their routes and how they're,
[1:19:55]
um, how they're making their ways in and out. Um,
[1:19:58]
and lastly, one of the speakers said that, uh, they
[1:20:01]
were proud to call, you know, this home Lake Elsinor
[1:20:04]
and they didn't think they were ever going to say
[1:20:05]
that. And they talked about the beauty and the expansion
[1:20:07]
that has gone on in the city. And this, this
[1:20:10]
is part of that. And unfortunately the roads don't get
[1:20:15]
bigger. The roads don't get bigger on their own. They
[1:20:18]
get bigger out of necessity. And things like our city
[1:20:23]
staff did an incredible job negotiating nine million dollars. To
[1:20:28]
go towards doing this stuff that we want. So all,
[1:20:31]
all the concerns that I've heard are valid. And they've
[1:20:38]
been. Comple. They've been, um, addressing those concerns. Yeah. I
[1:20:46]
mean, that you would act like. 9 million dollars in
[1:20:47]
a lot of money. So. I wouldn't say. Good job.
[1:20:55]
I'd say unitable. Job. Are. Somebody who's not a place.
[1:21:01]
I'm sorry, but the time for public comments is closed.
[1:21:04]
You were all given an opportunity to speak. I'm sorry.
[1:21:08]
I got. Your meeting in your room. I'm sorry.
[1:21:18]
Yeah. All right.
[1:21:40]
We keep moving forward. So. Were you doing? Yes. No.
[1:21:47]
Thank you. All right. Public here. I'm going to declare
[1:21:50]
the public hearing closed. The time is now 720. Uh,
[1:21:55]
may I have a motion. All right. We have a
[1:22:05]
motion for approval. Vice chair dvor. Any second.
[1:22:17]
By Commissioner Gray. So we'll move to vote. Is it.
[1:22:26]
Posting. Oh, I. Can't see.
[1:22:43]
The motion passes unanimously. All right. Motion passes unanimously. Congratulations
[1:22:52]
to Byrne African. Do we have staff comments tonight. No
[1:22:56]
comments tonight. City Attorney comments. No comments, manager. Any other
[1:23:01]
commissioner comments. Thank you for staff for all the information
[1:23:07]
you guys provided. It was great. Thank you. Yeah, it
[1:23:10]
was a great comprehensive report and package. So yeah, thank
[1:23:13]
you to staff for all of your work and to
[1:23:16]
the applicant for all of their outreach for this. All
[1:23:19]
right. Uh, the Lake Elsanor planning commission will join at
[1:23:22]
721 to the next regular meeting on Tuesday, September 15th.