Right. Uh, call the order the village
[0:06]
board meeting uh for the village of
[0:08]
Lisbon on Wednesday, August 12th, 2026,
[0:13]
6:31. Uh, roll call please.
[0:16]
>> President Gerky
[0:17]
>> here.
[0:18]
>> Trusty Monin
[0:19]
>> here.
[0:20]
>> Trusty Bomb
[0:20]
>> here.
[0:21]
>> Trustee Quinn
[0:22]
>> here.
[0:23]
>> Trustee Field
[0:24]
>> here. Administrator Green
[0:25]
>> here.
[0:26]
>> And clerk Capasel.
[0:28]
We'll stand for the pledge of allegiance
[0:29]
and a moment of silence.
[0:33]
Pledge of allegiance to the flag of the
[0:36]
United States of America and to the
[0:38]
republic for which it stands. One nation
[0:41]
under God, indivisible, with liberty and
[0:44]
justice for all.
[0:56]
» All right. Uh item three are citizen
[0:59]
comments. Um are there any citizens here
[1:02]
that wish to speak?
[1:05]
Anyone on Zoom?
[1:06]
>> No one present on Zoom.
[1:08]
>> All right. Um then we'll move on to the
[1:12]
uh item four which is the consent
[1:14]
agenda. Uh these items can be approved
[1:17]
in one motion unless the trustee
[1:19]
requests that they be consider any of
[1:21]
them separately.
[1:23]
All right. So, is there a motion on them
[1:25]
all or do we wish to pull something off?
[1:28]
>> Make a motion to approve the or approve
[1:31]
the consent agenda.
[1:33]
>> Is there a second?
[1:34]
>> I second.
[1:37]
>> Any discussion?
[1:41]
Hearing none. All those in favor say I.
[1:43]
>> I. I.
[1:44]
>> Say nay. Motion carries 5.
[1:54]
Uh item five uh A is to authorize the
[1:58]
payment of the one quick bills uh dated
[2:01]
July 23rd amount of $2,13466.
[2:09]
» Moved as presented.
[2:10]
>> Is there a second?
[2:12]
>> A second.
[2:13]
>> Any discussion?
[2:15]
Hearing none. All those in favor say I.
[2:17]
>> I.
[2:18]
>> Oppos say nay. Motion carries 40. Uh
[2:22]
item 5B is authorized payment of the
[2:26]
remaining bills dated July 23rd uh in
[2:29]
the amount of $39,319.554
[2:35]
and on August 6th for $170,32544.
[2:42]
Uh top five expenditures from July 23rd
[2:44]
are US Bank credit card for $151,79427,
[2:50]
Walker County Treasure in the amount of
[2:52]
$89,573.15,
[2:54]
Funk Engineering for $15,8485,
[2:59]
uh Village of Sussex for $14,171.58
[3:03]
and of Weiss Law Office for $6,716.96.
[3:09]
Top five expenditures for August 13th
[3:11]
are $36,193.15
[3:15]
per building inspection, $20,3671
[3:19]
to Kungpull engineering, $17,500 for
[3:22]
Carrick Holmes, $8,8646
[3:25]
to both infrastructure and $8,17244
[3:30]
to Guthther and Fry.
[3:36]
All right. Is there a motion?
[3:38]
>> Make a motion to approve the remaining
[3:40]
bills.
[3:41]
>> Is there a second?
[3:43]
>> Second.
[3:44]
>> Any discussion?
[3:47]
It's hearing none. All those in favor
[3:49]
say I.
[3:49]
>> I.
[3:50]
>> Post say nay.
[3:51]
>> Motion carries 5.
[3:54]
Uh item six is announcements and
[3:57]
correspondence. Um the public works and
[4:00]
utility committee
[4:02]
um
[4:04]
will meet on Wednesday, August 19th at
[4:07]
5:00 here at the village hall. Um the
[4:10]
public hearing and plan commission
[4:12]
meeting on Wednesday, August 26 at 6:30
[4:15]
at the Richard Young Fire Station.
[4:17]
Uh that public hearing, Lisa, is that
[4:21]
what type of public hearing?
[4:21]
>> Not commission public hearing.
[4:23]
>> Okay.
[4:23]
>> Not a joint public hearing.
[4:26]
Um and then uh Labor Day uh September
[4:30]
7th, we are uh closed. All village
[4:33]
departments are closed for the holiday.
[4:35]
Uh parks committee next meets uh on
[4:38]
Wednesday uh September 9th at 5.
[4:41]
>> We were going to NYX that meeting.
[4:44]
>> Okay.
[4:44]
>> Because I'm out of town and a couple of
[4:46]
the other members weren't going to be
[4:47]
there. So we're going to cancel that
[4:50]
one.
[4:50]
>> Okay. All right. Um,
[4:54]
so then, uh, the next village board
[4:56]
meeting is, uh, Wednesday, September 9th
[4:59]
at 6:30 here at the village hall.
[5:03]
Any other announcements or
[5:04]
correspondents that need to be noted?
[5:08]
Now, we'll move on to Dan, your
[5:09]
administrator's report.
[5:12]
Um, so Tamarak Road is uh completed and
[5:17]
obviously I haven't driven down that
[5:18]
road, but Matt, you have. I don't know.
[5:20]
Looks nice.
[5:21]
>> Shouldering and all that is complete or
[5:23]
to
[5:24]
>> Yeah, I mean it's there's I mean the
[5:26]
shouldering it's going to settle some
[5:27]
and it's I I don't like the way it
[5:30]
turned out with with uh I mean people
[5:31]
cutting the grass is is is it stinks but
[5:34]
yeah
[5:34]
>> and the they kind of butchered the uh
[5:37]
>> strip
[5:37]
>> the line the striping it I mean but
[5:40]
hopefully it fades well.
[5:41]
>> Yeah. And when they when they do road
[5:44]
projects like that obviously the the
[5:46]
road comes up a good three or four
[5:48]
inches sometimes.
[5:51]
overlay. But
[5:52]
>> isn't there the there a yellow line just
[5:54]
around the corner though?
[5:55]
>> Yeah.
[5:56]
>> I was surprised at that. But I guess
[5:57]
they need it for a curve.
[5:58]
>> It was there before. Um but yeah, it was
[6:02]
there before, but they but they they put
[6:04]
it in and then didn't put it in right.
[6:05]
So they scratched it out and still
[6:08]
doesn't Yeah.
[6:10]
>> Did they remove the portage, John?
[6:12]
>> Finally.
[6:14]
Um just an update to the board and that
[6:17]
you you all have heard but Natasha our
[6:19]
treasurer she was gone from Lisbon. Um
[6:23]
so she served the village for over seven
[6:25]
years. So thank her for um her time
[6:29]
spent here in Lisbon. Uh currently we're advertising the position. Um we
[6:34]
have four applicants so far. We have it
[6:37]
posted for another 10 days. Um at this
[6:40]
point I'm serving as the active
[6:42]
treasurer uh but trying not to become
[6:44]
signers on anything has to be conflict
[6:47]
for anything. So uh using Elisa when I
[6:50]
need to have a signer to authorize
[6:52]
things. So uh hopefully I don't um you
[6:55]
know do anything terrible but I we'll get through it. So um if you have
[7:00]
any questions feel free to contact me.
[7:02]
So um and then we're working on I'm
[7:06]
working on the prelim preliminary
[7:07]
budget. Um, we're getting net new
[7:10]
construction estimates in. We're getting
[7:11]
WA County Sheriff budgets estimates in.
[7:14]
Um, trying to get a number from the fire
[7:16]
department. I think we're close. Um, so,
[7:20]
uh, budget's coming along pretty well. I
[7:23]
did share the list of board priorities
[7:24]
from the last meeting with architecture.
[7:26]
We had a a phone call or a Zoom call and
[7:29]
so they're working on that engineering
[7:31]
design. Um, the next step in that
[7:33]
process. Um, and just one more final
[7:38]
reminder that this is the last week that
[7:40]
you'll have packets printed and next
[7:43]
month there will be none. So, bring your
[7:46]
laptops.
[7:47]
>> There will be none. So, bring bring your
[7:49]
laptops.
[7:52]
» So, I have to print it from home
[7:55]
>> or bring your laptops. I think everyone
[7:56]
was assigned a village laptop. So, I
[8:00]
think the point of us doing that was to
[8:01]
say paper so we didn't have to print and
[8:03]
then people can pull it up on here and
[8:06]
look through it. So,
[8:09]
that ends my report.
[8:12]
>> All right. Uh, Adam or does anyone have
[8:14]
any questions for Dan on that report?
[8:16]
>> Uh, the resurface
[8:19]
164 is next year for us.
[8:22]
>> Oh, yes.
[8:26]
And they did you go to that that
[8:28]
meeting?
[8:28]
>> I did not. I just read the minutes but
[8:31]
>> okay
[8:32]
>> if you have any questions but this is
[8:33]
more for everyone in that land. Uh if
[8:36]
you have any questions it's a state
[8:38]
project not a village of Lisbon or
[8:40]
Walkshshire County project
[8:43]
>> and that's for the south side is the
[8:45]
north side going to be done the
[8:46]
following year.
[8:47]
>> Silver Spring to County Q is 2027.
[8:51]
>> Okay good.
[8:57]
» All right. Uh item uh 8A is discussion
[9:01]
necessary action regarding the land and
[9:03]
stone water uh expansion project.
[9:06]
Um
[9:08]
Dan, you want to wait set the table for Ben here?
[9:11]
>> Yeah.
[9:12]
>> Uh so I provided a very a summary report
[9:17]
of uh what we talked about at the public
[9:19]
works committee. Um essentially we had
[9:22]
two options that we were um pursuing.
[9:26]
One was with the village of Sussex and
[9:28]
one was with the city of Pewwaukee for
[9:30]
retail water. Uh for the areas uh south
[9:34]
on Townline Road and south of K um east
[9:38]
of Corey Corners.
[9:40]
Uh we met with both communities and uh
[9:44]
both had pluses and negatives to um to
[9:49]
providing us water. We after going
[9:51]
through um each each point of data which
[9:56]
uh Ben was able to provide in his
[9:59]
presentation um the public works
[10:01]
committee gave a recommendation to
[10:03]
pursue Sussex as the water supplier for
[10:06]
this project. Uh and so that is what
[10:08]
we're trying to get we're looking for
[10:10]
the board to also
[10:12]
agree to. And then with that, um, we're
[10:16]
looking to approve an amendment to
[10:18]
Strand's contract to start looking at,
[10:21]
um,
[10:22]
engine or engineering and, uh, actually
[10:25]
bidding out the project. So, uh, you
[10:28]
have Ben's report here. If he if anyone
[10:31]
has any specific questions, uh, Ben's
[10:33]
here to answer them. I wasn't going to
[10:34]
have Ben go through the whole report
[10:36]
that he did at public works. Um and
[10:39]
Mark, if you have anything to add to
[10:41]
that as well,
[10:43]
>> right? Um yeah, thanks to Ben. He's uh
[10:47]
here in person tonight from Strand
[10:49]
Associates. Uh Mr. Ben Wood. Uh some of
[10:52]
the first off, we'd like to thank the
[10:55]
both communities for helping us with
[10:57]
this as far as uh cooperation and and
[10:59]
providing us with options to choose
[11:01]
from. Uh both were good options. uh one
[11:05]
was just a a better option for long-term
[11:08]
service and uh not having to essentially
[11:11]
split split service uh between north and
[11:15]
south of K. Um
[11:19]
it it is a very um I guess tentative
[11:23]
plan. We're we're working through it. Um
[11:25]
Ben, you have any major highlights you
[11:27]
want to share with our audience today?
[11:31]
Um, just real quick, I think you nailed
[11:33]
the big one, which is like Pewwaukee is
[11:35]
not a bad option, but just the way
[11:38]
looking at all the factors, it looks
[11:39]
like Sussex is a better option and
[11:41]
probably quicker to implement since um
[11:45]
Sussex is already serving portions of
[11:48]
Village of Lisbon's
[11:50]
property there. So, there's already
[11:52]
model template, things of that nature.
[11:55]
Um
[11:57]
the thing to kind of get noodled out is
[12:03]
there's still a plan to have an
[12:04]
emergency interconnect with the city of
[12:07]
Kiwaki and that'll require some state
[12:10]
agency review. Um but um meetings were
[12:14]
held with with both entities and Sussex
[12:17]
is very willing to take this on.
[12:22]
All right.
[12:25]
Um, was there any further developments
[12:27]
with the church property as far as uh
[12:30]
using
[12:32]
their property for an easement or
[12:34]
connecting to the back of those highway
[12:36]
or wire road properties?
[12:38]
>> I will say we did add into our updated
[12:41]
cost assuming that we will loop through
[12:43]
the church property. That was one of the
[12:45]
feedbacks we received in meeting with
[12:47]
the municipalities was to try to limit
[12:50]
the dead ends. And uh just for
[12:52]
everyone's reference, it would be the
[12:55]
page that's titled updated uh
[12:57]
contemplated water mains and critical
[12:59]
areas. And if you direct your attention
[13:01]
to redeemer church, there's an orange
[13:05]
loop that would go through the south
[13:06]
side of their property. Obviously, this
[13:08]
is tenative. We have a lot of
[13:10]
permissions, easements,
[13:12]
>> as well as uh final designs, but
[13:15]
tenatively it would it would be a good
[13:17]
option to service those four highlighted
[13:20]
properties. but not ideal because it's
[13:22]
coming from the backyard, but uh it
[13:25]
would it would still give us access to
[13:26]
those properties.
[13:29]
>> If for some reason down the road if we
[13:31]
ever get a sewer water utility, would we
[13:34]
get our customers back?
[13:36]
>> Um I believe the draft agreement that
[13:40]
Sussex has presented is modeled off of
[13:42]
your existing agreement and Dan, I
[13:45]
believe that's a provision in there.
[13:47]
>> Um yeah, I just reviewed it. Uh there is
[13:49]
a provision in there that we would
[13:51]
there's not a dollar amount specified
[13:53]
but we'll walk through some of those
[13:56]
>> giving them away. I don't know if
[13:57]
forever going to do it but if we did
[13:58]
just so we have the option.
[14:00]
>> Yeah.
[14:03]
» And that is one of the considerations
[14:05]
why we'll own the infrastruct
[14:07]
infrastructure as well not just give
[14:09]
them the infrastructure.
[14:10]
>> Yeah.
[14:12]
Perfect.
[14:17]
Um
[14:19]
obviously high cost project but um I
[14:22]
mean and Nate's here from Lann and
[14:25]
Stone. Um I think it's appropriate to I
[14:28]
mean bring him in on this as well. I
[14:30]
mean you was you did he partake in the
[14:32]
conversation at the utility committee
[14:34]
meeting?
[14:34]
>> Um yeah I mean for the for the essence
[14:37]
of Mr. Wood spoke on behalf of the
[14:41]
agreement or cooperation between LSP and
[14:45]
Strand as well as the village. So, um I
[14:49]
mean do you guys have anything you want
[14:50]
to expand on that as far as
[14:54]
>> No, I think we had a good discussion
[14:56]
last month.
[14:58]
Yeah, sorry. No, I think we had a good
[15:00]
discussion um last meeting and Ben
[15:03]
covered it really really well and I
[15:04]
think we're all in agreement about how
[15:06]
the cost would be used and everything.
[15:08]
so far.
[15:10]
>> Yes.
[15:10]
>> So all the costs involved in this is is
[15:13]
going to be covered by you guys in your
[15:14]
budget
[15:15]
>> as designed right now. Yes.
[15:17]
>> You change do you think it's going to
[15:18]
change?
[15:21]
>> Well, fair question. So we've gone
[15:23]
through a 30% design so we can kind of
[15:26]
get a higher confidence level in the
[15:28]
cost just to kind of set the table to
[15:31]
make sure that yes, it's within the
[15:33]
realm of possibility. Let's continue to
[15:35]
move ahead. So, part of what's uh part
[15:38]
of the ask tonight is for an amendment
[15:41]
for us to get all the way to final
[15:43]
design, prepare those bidding documents,
[15:46]
and then we'll have that um
[15:49]
the layout nailed down even tighter with
[15:52]
updated costs, and we're looking at a
[15:55]
2027 construction for all of this. So,
[15:59]
from here, um several things will happen
[16:02]
on a parallel track. Strand will start
[16:05]
final design. Um the village will
[16:08]
probably presumably have some updated
[16:11]
negotiations with land and stone
[16:12]
products. Um the village will have some
[16:15]
updated discussions with Sussex and
[16:17]
probably hash out that finalizing that
[16:20]
agreement and we'll submit some agency
[16:23]
permit applications and and uh I know
[16:27]
Land and Stone and Village also intend
[16:28]
to do some public notices also of
[16:33]
pending action tonight. Um and that'll
[16:36]
all kind of be going ahead for the rest
[16:40]
of this year into early next year. So
[16:42]
it's not just the construction that's uh covered by by by the quarry
[16:48]
which we really appreciate. I mean the residents do too but all strands
[16:52]
cloths and everything are all covered
[16:54]
under
[16:56]
>> the quarry fund.
[16:57]
>> Pardon me.
[16:57]
>> It's in the it's coming from the Corey
[16:59]
fund which is the the deal that we have
[17:01]
with the course. Just want to make sure
[17:03]
that one.
[17:04]
>> And then to Ben's point, uh Lannon Stone
[17:06]
did also reach out to um public
[17:11]
call that
[17:13]
uh public relations um uh consultant.
[17:17]
And so I had a nice conversation with
[17:18]
him and we're going to work on once we
[17:21]
move on from this space getting the the
[17:24]
residents in this area notified holding
[17:26]
some public input meetings and and going
[17:28]
through that step so that we can kind of
[17:30]
hash that piece of it out before
[17:32]
hopefully before the end for the end of
[17:34]
the year ideally.
[17:37]
>> Does that $15,000 private property work
[17:40]
that coverage so the homeowners don't
[17:41]
pay anything?
[17:45]
» Nice. Well,
[17:46]
>> that's the intent.
[17:48]
>> Yeah.
[17:50]
>> And what is the total amount that's
[17:51]
going to be in the fund at the end of
[17:53]
the day that that the agreement was
[17:54]
written for years ago?
[17:57]
>> What do you mean? Uh
[17:58]
>> how much is in there right now? Or
[17:59]
>> No, no. How much is going to be in there
[18:00]
at the at total commitment was it was I
[18:03]
would say north of 107.
[18:06]
>> Yeah, I think it was closer to 15,
[18:08]
wasn't it? Something like that. Yeah, it
[18:10]
was 13 to 15 depending on sales and
[18:13]
inflation over the the period there's an
[18:15]
inflation escalator in there. Um,
[18:19]
>> okay. So, I mean with the 20%
[18:21]
contingency
[18:22]
and with the contingency and then the uh
[18:26]
20% contingency on top of that, I mean,
[18:28]
we're we still have a couple million
[18:29]
dollar cushion. Well, yeah, but I I
[18:32]
mean, keep in mind, too, that they were
[18:33]
probably anticipating when that
[18:35]
agreement was done to have municipal
[18:38]
water for more than just this area. I
[18:41]
>> certainly the hope.
[18:42]
>> Yeah. Right.
[18:42]
>> So, they didn't they didn't know at the
[18:44]
time what the cost would be.
[18:45]
>> I mean, if this is the area we need to
[18:47]
get done, I mean, to Linda's point, I
[18:48]
mean, we we we have the funds to cover
[18:52]
this that that we're not paying for. I
[18:56]
mean again the money hasn't been
[18:57]
received yet but it's going to be
[18:59]
received over the period of time.
[19:04]
» Uh Ben under the uh Strand Associates
[19:07]
agreement can you highlight what the
[19:10]
change was for compensation?
[19:12]
>> Yeah sure. Um, so we were under contract
[19:15]
for 188. This adds 225,000
[19:20]
to take us from 30% design to final
[19:23]
design uh for a total of 413.
[19:27]
And did want to point out there's some
[19:30]
uh several items listed as like items
[19:32]
not included. Um that's primarily
[19:35]
because we think they're not required
[19:37]
other than the public involvement stuff
[19:40]
which um
[19:45]
we have in our base 188 some of that
[19:48]
already but um
[19:52]
particularly easement
[19:54]
descriptions are not included yet. I
[19:56]
think once we get a little farther in
[19:58]
design, we'll understand kind of what
[20:01]
the property acquisition element of this
[20:03]
looks like. If I'm assuming that some
[20:07]
property owners will be cooperative,
[20:10]
others might not. You know, we'll kind
[20:11]
of see what easement acquisition is
[20:14]
going to look like and we might be back
[20:16]
for an ask related to assisting with
[20:19]
that.
[20:20]
>> Um, as we talk about public information,
[20:23]
I I noticed that the public information
[20:24]
meetings were excluded. Is that is that
[20:27]
strand services? Is that the
[20:30]
>> second?
[20:33]
>> I'll take the first crack at this. So,
[20:35]
in the agreement that you have in your
[20:37]
packet, um
[20:42]
it's items not included is number eight
[20:46]
and nine. That's on that last page.
[20:49]
I went back in preparing for this
[20:51]
meeting read reread the base scope of
[20:54]
services again um and I know you don't
[20:57]
have this in your packet but we already
[20:59]
have included
[21:01]
um under program management up to 300
[21:04]
hours for lots of random potential
[21:07]
things like extra agency communication
[21:10]
funding coordination and one of those
[21:13]
items is public outreach and what's
[21:15]
already included is communicated with
[21:17]
communicate with the public about the
[21:19]
project via owner approved means
[21:21]
including mailers, public information
[21:23]
meetings, information updates, and
[21:25]
owner's website public hearings. Um, so
[21:29]
basically what I want to suggest is what
[21:33]
you have in your packet is that we
[21:36]
delete items 8 and nine because there's
[21:39]
an element of that already included.
[21:42]
Um the way that works, how we described
[21:45]
it in the original
[21:47]
um agreement is we're just billing
[21:50]
hourly as needed up to certain hours. So
[21:54]
to the extent that Landon Stone Products
[21:56]
is using
[21:58]
uh a public relations
[22:00]
consultant and they're paying for that,
[22:03]
we'll help feed them information, maybe
[22:05]
review materials, whatever. But I think
[22:07]
it all fits well within our kind of base
[22:10]
scope.
[22:15]
Um is there there's no contingency on
[22:17]
strand services as far as
[22:19]
>> correct. Okay.
[22:20]
>> Are we bill hourly in expense not to
[22:22]
exceed up to that total
[22:25]
>> thresholds? Um if for some reason I said
[22:28]
the only foreseeable
[22:30]
additional scope might be the easements
[22:32]
once we get into that pin that down. But
[22:36]
uh that's how that looks. Um there's
[22:39]
contingency in the budget but there's
[22:41]
not contingency in our agreement.
[22:47]
» What happens then?
[22:49]
>> Uh if we get close to our threshold, we
[22:51]
wouldn't we wouldn't build beyond that
[22:53]
without coming back and uh asking for
[22:56]
another
[22:57]
>> asking the village.
[22:58]
>> Yeah.
[23:00]
for our
[23:02]
if we get close to our total of 413,000
[23:06]
then we would come back and ask for
[23:08]
amendment if that was warranted.
[23:10]
>> You wouldn't go back to Strand. But you wouldn't go back to
[23:14]
>> I'm with Strand,
[23:15]
>> right? I I'm just saying I got mixed up
[23:17]
the quarry. You wouldn't go back to the
[23:18]
quarry. You would ask the village to pay
[23:20]
the difference
[23:21]
>> because we we hold the funds. So that's
[23:24]
why they have to come to us.
[23:25]
>> I know we hold the funds, but what
[23:26]
happened to the funds? Like he was
[23:27]
saying gets down and you have to ask for
[23:29]
more.
[23:30]
>> Well, they're coming to us tonight, not
[23:32]
coming to land and stone. We're we're
[23:34]
>> Okay.
[23:35]
>> From their fund,
[23:36]
>> right? Right.
[23:36]
>> Cory's fun.
[23:38]
>> Our Corey fund.
[23:39]
>> Yes. LSP's
[23:41]
work. Yes. And tipping. Yes.
[23:43]
>> Tax contributes to that fund.
[23:45]
>> Yes. So he's saying if the if their
[23:47]
contract goes over the 417,000,
[23:50]
he's going to come back to us and then
[23:52]
we'll issue funds from the Corey fund if
[23:54]
we approve any amendments
[23:55]
>> from the fund. Okay.
[23:56]
>> Yeah.
[23:56]
>> But with that being said, I mean the way
[23:57]
that the way that I hear, you know,
[23:59]
billing at an hourly rate and then will
[24:01]
not exceed having a cap on it. The only
[24:04]
way that we would go above the fourth 13
[24:07]
is if the the scope changed or if the
[24:09]
number of hourly I mean so if it happens
[24:12]
to take you longer to design what you
[24:14]
have planned here
[24:16]
>> then you eat that effectively.
[24:19]
>> Okay. Right.
[24:19]
>> Yep.
[24:23]
» Um I mean so I mean this these are just
[24:26]
the numbers we have here. I mean, these
[24:27]
are big numbers, but I I I mean, staff
[24:30]
and the committee has has looked in that
[24:32]
and you're comfortable with what's
[24:34]
behind it.
[24:34]
>> Yeah, there was um Strand and with LSP's
[24:38]
input, too. We we had a very long
[24:40]
meeting about it. Um it was it was very
[24:43]
informative. We went this packet that
[24:45]
you have uh with the PowerPoint. We went
[24:48]
through it, asked a lot of questions on
[24:49]
it. Um, you know, we found we found some
[24:53]
things that we changed a little bit and
[24:55]
I mean it's it's working. I mean, it's
[24:58]
>> And you guys pass it unanimously.
[25:00]
>> We did. Yep.
[25:02]
>> Just one other thing to add if I can
[25:05]
uh just kind of reiterate some of Landon
[25:08]
Stone Products sentiment is uh if we
[25:12]
start on final design now, we feel like
[25:14]
it took longer to get to a decision
[25:16]
point between suppliers than we
[25:18]
anticipated. some of that communication
[25:20]
got drug out. Um but public works
[25:23]
committee made that unanimous decision
[25:25]
and we feel if we start design now then
[25:28]
we can still advertise for bidding to
[25:30]
get this done in the 2027 construction
[25:32]
year. And part of the sentiment is the
[25:35]
longer we wait to do this the
[25:38]
>> buying power of that bond gets eroded.
[25:42]
You know what I mean? So it's kind of in
[25:45]
essence the board could think about it
[25:47]
as a you know well we're doing this
[25:51]
right since we're doing this then then
[25:55]
uh
[25:57]
taking action tonight keeps everything
[25:58]
on schedule.
[26:01]
>> Are there going to be any issue like
[26:02]
water pressure issues going from a well
[26:04]
to city water?
[26:06]
>> Um great question. Um there's actually
[26:08]
going to be really strong pressure down
[26:10]
here.
[26:11]
>> Yeah.
[26:12]
>> Kind of in the 80s.
[26:14]
>> So um most people that are on a well
[26:18]
have their well pressure set in the
[26:20]
mid50s.
[26:22]
>> Um so it's changed. Uh building code
[26:26]
says if it's greater than 80 PSI then
[26:28]
there has to be a pressure reducing
[26:30]
valve on that line. And once there's
[26:33]
that pressure reducing valve on that
[26:34]
line, if folks want to set it to be, you
[26:37]
know, 58 PSI, just like it was before,
[26:40]
they'll have that option.
[26:42]
>> Is this not going to cause any issues
[26:43]
with houses that have been on 50 and
[26:45]
then all of a sudden they get shot to is
[26:47]
it going to shock anything or
[26:48]
>> um That's a good question. All I can
[26:50]
tell you is we went through this in
[26:52]
Lannon and we converted about 200
[26:54]
properties over to municipal system and
[26:58]
municipal pressure and we actually
[26:59]
didn't do any PRVs. So, they really did
[27:02]
go from the full like 50 to 80. And I
[27:07]
have not heard any reports in the way
[27:09]
that people talk. I'm sure I would have.
[27:12]
I haven't heard any reports of internal
[27:14]
plumbing. But yeah, there's
[27:16]
>> certainly some to talk about in the
[27:18]
public hearings that people think a
[27:20]
>> pipe behind a wall is going to burst and
[27:22]
all kinds of things. But
[27:24]
>> yeah, we we talked
[27:25]
>> we did talk at the public works last
[27:27]
month about that and and covered it at
[27:29]
length about
[27:31]
>> that's going to be part of our public
[27:32]
information campaign as well. So people
[27:34]
are aware that there is a pressure
[27:36]
increase and you know what we recommend
[27:40]
or maybe don't need to recommend at this
[27:42]
point.
[27:44]
>> That's good.
[27:48]
» I don't have any other questions or
[27:50]
anything. I mean, anyone else have any
[27:52]
discussion here?
[27:53]
>> No, I I just um if I could just add and
[27:57]
I'll say it again. I think it's I know
[27:59]
it's very very expensive and I know it's
[28:02]
been voted not to do the sewer for the
[28:04]
homeowners with it because they don't
[28:05]
want it, but I think in the long run it
[28:07]
might be a mistake because it's not
[28:08]
going to get cheaper. I think it's the
[28:11]
time to do it, but they don't want it
[28:14]
and that's fine.
[28:16]
And I hope it doesn't come back to hurt
[28:18]
him someday or someone will move over
[28:20]
there.
[28:23]
» You ready for a motion?
[28:26]
>> Yep. Uh
[28:28]
>> it's a recommended motion on the bottom
[28:29]
of my
[28:31]
>> I'll make a motion to proceed with the
[28:33]
village's preferred supplier based on
[28:34]
the recommendation from the public works
[28:37]
committee and proceed with the schedule
[28:40]
presented and approve amendment number
[28:42]
one to the technical services contract
[28:45]
by strand striking eight and nine as all
[28:50]
else presented.
[28:52]
>> Is there a second to that motion?
[28:53]
>> I second. All
[28:56]
right. Is there any additional
[28:57]
discussion?
[29:00]
>> Thank you.
[29:00]
>> Hearing none. All those in favor say I.
[29:02]
>> I. Say n.
[29:04]
>> Thank you very much for coming. Please.
[29:05]
>> Yeah. Works. Thank you.
[29:07]
>> 5. Appreciate it.
[29:10]
See you tomorrow.
[29:13]
>> Bye.
[29:20]
» Great. Uh item 8B is discussion and
[29:23]
necessary action regarding the
[29:24]
replacement of the uh WAM mowers with
[29:30]
zeroturn mowers.
[29:33]
Um
[29:35]
>> Dan or Marrick who wants to take this?
[29:38]
>> Yeah. Uh so this is
[29:41]
by way of uh public works. Um it does
[29:44]
have to deal with parks, but uh just by
[29:46]
way of department, we're looking at um
[29:51]
replacing our wide area mowers or also
[29:54]
referred to in your packet as whams. Um
[29:57]
and we're looking to play replace those
[29:58]
with commercial zeroturn mowers. So just
[30:01]
for visual, the ones you sit on and
[30:04]
drive from a seat. Um
[30:07]
so Mike was really really very helpful
[30:09]
with this. uh there was a lot of uh
[30:12]
testing that went into play. Um and he
[30:16]
outline outlined in your packet the
[30:18]
current equipment that they have as well
[30:20]
as some of the challenges with our
[30:22]
current operations. Uh just some of the
[30:25]
things that we ran into. Um we currently
[30:28]
only have one of the full-time parks
[30:30]
employees that has a CDL uh limitation
[30:34]
on his on his license. So that limits
[30:36]
staff efficiency.
[30:38]
Uh I guess the concern from the parks is
[30:42]
that it limits productivity during the
[30:43]
busiest part of the season. Um when we have the additional labor
[30:47]
because we do hire seasonals. Um but the
[30:51]
essentially the labor can't transport
[30:53]
the mowers. So we're looking for a
[30:55]
smaller, more versatile and better
[30:58]
utilized mower. Um the wide area mowers
[31:02]
are a lot slower than what zero turns
[31:05]
can do.
[31:07]
Now, they do have a greater width in
[31:10]
cutting. Um, but it they're a lot
[31:14]
slower. The maneuverability is a lot
[31:15]
lower, and uh through the uh T& they
[31:20]
determined that uh we can actually be
[31:22]
more efficient if we're using the um
[31:25]
zero turns.
[31:27]
One of the other things that Mike looked
[31:28]
at was the um the cost of equipment.
[31:31]
Obviously, in the last five years, we've
[31:33]
s seen prices all over the board with uh
[31:36]
pricing and everything is becoming more
[31:38]
and more expensive. Um, just an example,
[31:42]
the
[31:43]
>> the 2020 wide area mower that we
[31:45]
purchased was 67 grand. Uh, that was a
[31:48]
2020. If you look at the Ferris model
[31:51]
that we tied, it's got a 72 inch uh
[31:54]
mower deck on it and it's at 17,000. Um,
[31:58]
so lower prices, quicker cutting, uh,
[32:02]
better utilization by staff, and, uh,
[32:04]
actually parts was a consideration, too.
[32:07]
That might cost in there. Uh, it's
[32:09]
actually easier to find the parts and
[32:10]
they're less expensive, and the, um, the
[32:14]
repairs take less technical expertise to
[32:16]
complete. Um,
[32:20]
the proposed equipment's on page two of
[32:22]
your packet. Uh they were looking to do
[32:25]
three of the Ferris 72-inch mowers. Um
[32:29]
also too, one thing that we also thought
[32:31]
of was the insurance cost and uh so
[32:34]
we'll not that it's make a substantial
[32:37]
difference to our insurer, but uh they
[32:40]
would definitely will probably feel
[32:41]
better about the fact that we're getting
[32:42]
something more compatible with our
[32:44]
seasonal help. So um they're just
[32:48]
they're better on hills, they're more
[32:49]
versatile on hills
[32:52]
and Also
[32:54]
too, uh they Mike talked about training.
[32:58]
Uh he's going to train all the seasonal
[32:59]
employees on how to to uh utilize them
[33:02]
in a safe manner. Um so just uh if you
[33:06]
look at page, let's back up page four.
[33:10]
Uh the cost of three commercial Ferris
[33:12]
zero turns with 72inch decks is 52
[33:14]
grand. Um the sale of the current John
[33:17]
Deere and Toro units would somewhere
[33:20]
yield between 35 and 50 on return value
[33:24]
and uh there obviously will will be some
[33:27]
minimal cost uh to transition that we
[33:30]
don't have a figure for at this time. Uh
[33:32]
but we looked at uh the financials
[33:36]
there. So, based off of all the
[33:38]
different avenues they've considered,
[33:40]
the recommendation from Mike and his
[33:42]
crew would be to uh transition to the
[33:45]
Ferris
[33:46]
uh mowers.
[33:49]
Uh it should be noted that the public
[33:51]
works committee heard this and they
[33:55]
voted unanimously to pass.
[33:57]
Um
[33:59]
that's what I got. Any specific
[34:01]
questions, Linda?
[34:05]
dollars and cents. You can't afford not
[34:06]
to do it.
[34:07]
>> Yeah, it was uh we were really actually
[34:08]
surprised when the Ferris numbers came
[34:11]
back for I mean they're they're tough
[34:13]
machines. They're not uh your home uh
[34:16]
>> they were commercial grade.
[34:17]
>> They are commercial. A lot of uh lawn
[34:20]
cutting services use them actually.
[34:22]
>> Oh yeah. One of them's been doing for 10
[34:24]
years.
[34:24]
>> Yeah. So uh they're generally red and
[34:27]
blackish.
[34:29]
So
[34:29]
>> you buy we buy all three at once?
[34:31]
>> We would. And what is their lifespan?
[34:35]
>> I wish I could tell you that, but uh
[34:38]
>> like that maybe.
[34:39]
>> It really depends on how often they're
[34:40]
used. I mean, they were going to do
[34:43]
maintenance on. So, um being a new unit,
[34:47]
it would have a warranty on it.
[34:51]
>> You guys have obviously thought this
[34:52]
through, but so um why three and not
[34:56]
two? How how many get used at any given
[34:58]
time?
[35:00]
Yeah, there was uh I think that's kind
[35:02]
of a multiaceted thing. They don't think
[35:05]
all three would be used at one time, but
[35:08]
in the event that one of them went down,
[35:11]
they they would have the option to jump
[35:14]
on the other one and service the other
[35:16]
one, but they could use them at three
[35:18]
times. It really the problem we have is
[35:20]
we can't always count on our seasonal
[35:21]
staff for the DPW. So that that's where
[35:25]
it's kind of the the third one is the
[35:27]
relief mower or
[35:30]
less utilized one.
[35:31]
>> So two of them would often get used the
[35:33]
same
[35:35]
three. I mean have all your seat belts
[35:36]
work same day and LCD is the part you
[35:39]
have to probably want to use all three
[35:42]
but I think it would make sense that you
[35:44]
alternate some of those two so that you
[35:48]
down and replace.
[35:51]
Yeah, definitely.
[35:53]
>> Um, and then the highway department,
[35:55]
they considered keeping one by them so
[35:56]
that one of their guys can
[36:00]
feel better.
[36:01]
>> I was going to ask about storage. I
[36:03]
mean, this does this will take up more
[36:04]
space, but we we have
[36:06]
>> I think actually I think so these are
[36:08]
actually going to take up less space and
[36:10]
then the transportation of them, we're
[36:12]
not going to have to have as big of
[36:13]
trailer.
[36:15]
>> So I all around it it makes better
[36:18]
sense. It's uh it's not as it's probably
[36:22]
half as long as the the whaml mowers and the width on the whamlowers is what
[36:26]
really gets you.
[36:28]
>> So you can you can imagine those have
[36:30]
wings that fold down and
[36:31]
>> Yep.
[36:32]
>> You have to have a different type of
[36:33]
trailer. They're a lot heavier of a
[36:35]
unit.
[36:35]
>> Well, you need a CPL to be able to
[36:37]
transport two of them.
[36:39]
>> I think it's a wise choice.
[36:41]
>> Yeah. No, I I was uh kudos to Mike. I
[36:43]
think he did a great job with or Nick
[36:46]
and Mike.
[36:48]
makes put the report together.
[36:51]
>> So, and I was on site for the testing
[36:53]
for two of the three. We did Skagg and
[36:55]
we did uh Baris Bears has front
[36:59]
suspension that makes it a much smoother
[37:01]
ride, which was really nice. And then
[37:03]
you could just tell the Cotton was a lot
[37:05]
cleaner than than Skags. And Skags are
[37:07]
good motors, too. But, um, we everyone
[37:10]
agreed that this was the one to go with,
[37:13]
and I believe the prices were spot on.
[37:16]
bar and slightly cheaper.
[37:21]
» Okay.
[37:22]
>> And we're comfortable with the changes
[37:24]
from with with the mini excavator with
[37:27]
to the storm water and so that all works
[37:29]
out.
[37:29]
>> Yeah. It really depends on what we sell
[37:31]
the other piece of equipment for, but
[37:33]
the thought was, yeah, we supplement. I
[37:35]
mean, we talked about potentially paying
[37:36]
for the mini all out of storm water, but
[37:38]
given that we did the borrow, this would
[37:41]
just open up uh being able to take a
[37:44]
small section water if it made a
[37:46]
difference.
[37:48]
So, that 12 311 is effectively a plug
[37:52]
number that will go up or down based on
[37:55]
the sale of the equipment if it's more
[37:58]
or less than 40,000.
[37:59]
Yep.
[38:06]
» All right. Are we ready for a motion?
[38:10]
>> Sure. Uh, I'll make a motion to approve
[38:13]
the purchase of three commercial Ferris
[38:16]
zeroturn mowers with 72in decks at
[38:19]
estimated cost not to exceed $52,311.
[38:23]
Sec.
[38:26]
Right. Is there any additional
[38:28]
discussion?
[38:31]
It's hearing none. All those in favor
[38:33]
say I. I.
[38:34]
>> Oppos say nay. And motion carries.
[38:38]
>> Um item C is discussion and necessary
[38:41]
action to set the 2027 budget workshop
[38:45]
dates.
[38:48]
Yeah, I know we had talked about this a
[38:49]
little bit at the last meeting, but I I
[38:51]
didn't see anything listed in the
[38:52]
packets or otherwise. Where are we at on
[38:55]
this? Um, I just kind of kept it open to
[38:58]
for everyone to look at their calendars.
[38:59]
I didn't want to put a date out there
[39:01]
and then have
[39:03]
be unable. So, typically we do this in
[39:06]
September, usually in midepptember.
[39:09]
Um, we do have a village board meeting
[39:11]
on the 9th, but I know I believe Paula
[39:13]
you weren't going to be able to make
[39:14]
that one.
[39:15]
>> Yep. No. Um,
[39:18]
so if you know we're looking at sometime
[39:22]
maybe September 17th
[39:25]
>> might be a good day at Thursday.
[39:28]
Um,
[39:29]
>> what time are we looking for?
[39:31]
>> It's like available 5 to midnight thing
[39:34]
or 5 to 10 5
[39:37]
>> 5 to 7 to 7.
[39:38]
>> I'd rather do one extra one and not do
[39:40]
the marathon session. I'm just gonna say
[39:42]
that right now. we we can do too. But
[39:45]
>> well, I think I think it's necessary to
[39:47]
do more than one because you you you
[39:49]
have I mean you have a meeting and then
[39:50]
there's questions that come up and I
[39:53]
mean I I think even to get it done in
[39:55]
two is probably well it's not realistic
[39:58]
but I mean but I think maybe some of
[39:59]
those going to be
[40:00]
>> a short one after the October meeting or we can tie those into something else
[40:05]
as well.
[40:06]
>> Are they expecting state numbers to come
[40:08]
in on time?
[40:10]
>> We have preliminary like
[40:15]
all that. We always at the same time. So
[40:18]
the 17th will probably not have those
[40:20]
numbers. Probably looking at October.
[40:26]
So I mean we can push it toward to
[40:28]
October.
[40:30]
Um,
[40:32]
but I mean if we're just going we could
[40:34]
potentially go over expenditures
[40:36]
in you know September and then go over
[40:40]
revenue.
[40:44]
» There's kind of a relationship there
[40:45]
though too. I mean
[40:46]
>> yeah.
[40:47]
>> Well, yeah, I suppose.
[40:52]
» So September 17th is the date that you'd
[40:55]
like to do it or do you want to
[40:56]
>> I'm just throwing a date out there. I
[41:00]
the 16th and the 23rd. Obviously, we
[41:02]
public works. We have uh plan
[41:04]
commission.
[41:06]
Um we could do Wednesday the 30th.
[41:11]
You go to Wednesday.
[41:13]
>> I am gone to South Carolina and DC from
[41:16]
the 10th. I'll be here for the 9th. I
[41:19]
did that on purpose. I leave on the 10th
[41:21]
and coming back on the 23rd.
[41:24]
>> So, the 30th they weren't meeting
[41:27]
it. There it is.
[41:33]
September 30th, correct?
[41:37]
>> Are we putting that one on the calendar?
[41:39]
>> So, you said you're back on the 23rd.
[41:41]
So, like if we wanted to look at the
[41:42]
24th, that's probably too too tight with
[41:44]
getting back then.
[41:45]
>> Well, that's okay. I have I have two
[41:47]
doctor's appointments on the on that
[41:49]
day. And long as I'm busy, I'm busy.
[41:51]
That's okay.
[41:53]
>> Oh, okay.
[41:56]
So you guys can definitely
[41:58]
>> Oh, you got to be here.
[42:02]
» All right. So, I guess we'll go with
[42:03]
December 30th at then.
[42:04]
>> What time? 6:30.
[42:07]
>> Should we do six?
[42:08]
>> I didn't go earlier.
[42:09]
>> Yeah, I'm not here all late.
[42:10]
>> But would you like six?
[42:12]
>> I was just thinking of what you said,
[42:14]
you know, as far as I want to have not a
[42:16]
real long meeting. Have two shorter
[42:18]
ones, but one long is okay.
[42:21]
>> Six is fine with me. I'm just going to
[42:23]
have to plan because I just need to have
[42:25]
coverage for my
[42:26]
>> your mother.
[42:27]
>> Yeah.
[42:27]
Okay.
[42:28]
>> So, okay. So, September 30th at 6
[42:31]
o'clock. Is that the consensus? And then
[42:33]
>> we'll also I mean we'll certainly have a
[42:37]
budget workshop on October 14th as well,
[42:40]
but hopefully that will be, you know,
[42:42]
much more brief.
[42:45]
>> Is the department head one going to be
[42:47]
the 30th or is that the October one?
[42:50]
>> Uh, we can get the department one head
[42:55]
until the October 14th.
[43:00]
» What other day do you say, Matt? The
[43:02]
14th.
[43:02]
>> I think we just have, you know, some
[43:04]
tie-ups and some other discussion, you
[43:05]
know, at a budget workshop after the
[43:07]
village board meeting.
[43:08]
>> Oh, so
[43:09]
>> Oh, on the 14th.
[43:10]
>> Yes. Yes. I mean, hopefully
[43:12]
um I mean, we'll try to load up the
[43:15]
September meeting if if there's anything
[43:16]
that's out there and we can try to keep
[43:18]
the October Village board meeting more
[43:20]
brief if possible. And
[43:22]
>> then we'll have the second part of that.
[43:24]
Then I that makes sense, right?
[43:26]
>> Mhm.
[43:28]
At what time for that? We'll just leave
[43:30]
it open for now until we know.
[43:32]
>> Or do we want to start maybe a half hour
[43:33]
early
[43:34]
>> then?
[43:35]
>> On the 14th.
[43:36]
>> for the village board meeting. You said
[43:38]
>> start it at 6 instead. That'll give us
[43:39]
buy us a little more time if we have a
[43:41]
lot going on.
[43:41]
>> I think so too.
[43:43]
>> Yeah. I mean the sooner we can start
[43:44]
that the better. Otherwise we could be
[43:46]
here at depending on
[43:48]
>> I can start at five if you want to.
[43:50]
Okay. that far out.
[43:52]
>> I'm okay with that, too. Oh,
[43:54]
>> that
[43:55]
>> um six o'clock sounds good to me. I I I
[43:57]
know that
[43:58]
>> five.
[44:00]
>> Okay. Any another nomination here?
[44:04]
>> So, we're going to say six then. Yes.
[44:05]
>> Yeah. Six on both.
[44:07]
>> Six.
[44:07]
>> The 30th and the 14th.
[44:10]
>> Okay. But
[44:12]
is a village board meeting. So, it'll be
[44:13]
right after.
[44:14]
>> We're just moving up the village board
[44:15]
meeting by half an hour. We'll try and
[44:17]
keep that agenda like so we
[44:19]
>> Okay.
[44:19]
>> get through it. Okay. Okay.
[44:24]
>> I don't think we need formal action
[44:25]
here, Dan.
[44:25]
>> No, I'm sending uh uh calendar advice.
[44:30]
>> Okay. Thank you.
[44:33]
That's the biggest job we have to do is
[44:35]
that that's a big job.
[44:40]
» The budget you're doing that before I
[44:42]
put my calendar in.
[44:43]
>> Yeah.
[44:47]
» All right. Are we I think we're good
[44:48]
then on this item. So we can move on to
[44:51]
>> uh item D which is discussion on the
[44:55]
maintenance and service of grinder
[44:57]
pumps.
[44:58]
>> Right. I circulated paperwork that I
[45:00]
have written out. I just asked you to
[45:03]
look at this with an open mind as if you
[45:05]
were in the district and what you would
[45:07]
want um because there's 452
[45:11]
homes current residents on sewer. I
[45:14]
believe there's about 32 grinder pumps
[45:17]
and since the beginning when they
[45:19]
started this in 1989 thereabouts I went
[45:22]
to all those meetings never once did
[45:25]
they bring up grinder pumps I was
[45:26]
shocked when I was uh on the old board
[45:29]
and I go what is a grinder pump and then
[45:31]
I realized I know what it is obviously
[45:33]
now I've been told all these years but
[45:36]
the whole all the 452 homes have been
[45:39]
paying for these and they are installed
[45:43]
in the person's home, not on out in the
[45:46]
yard. It's in the home. And when there's
[45:49]
an issue, a big alarm goes off. And so
[45:51]
these people, they call like debell
[45:53]
right away. They don't care if it's six
[45:54]
o'clock in the morning, have an
[45:56]
emergency call or 5:00 at night, they
[45:59]
call whatever. And then they go out
[46:01]
there and they fix it. Then then we have
[46:02]
normally paid for the bills. Um, we've
[46:05]
also um um if it's a seller's fault
[46:09]
because there is something that was put
[46:11]
down the toilet and it's only one time
[46:14]
that I can remember that we as a
[46:17]
district had a problem in Wooded Hills.
[46:19]
It was a $25,000 charge and the
[46:21]
homeowners insurance paid for it, which
[46:23]
they were very lucky. Um, we just had
[46:26]
one the other couple months ago and I
[46:29]
wasn't at that board meeting. The four
[46:31]
three members voted to replace it. uh to
[46:35]
re replace it because it was a little
[46:37]
older. But it's still in my personal
[46:41]
opinion, we shouldn't have paid uh paid
[46:42]
it because there's no limitation on the
[46:45]
age of the pump. It's just this was
[46:48]
wrecked by the child by the homeowner's
[46:51]
grandson put it something down. So we
[46:53]
paid $4,200 to replace that pump and
[46:57]
they paid a,000. These are gotten more
[47:00]
expensive and more expensive. Um, and I
[47:04]
checked with local communities when I
[47:05]
presented a a um um um talk back at the
[47:12]
old district. I had checked and I found
[47:15]
my own notes. I checked with Waterford.
[47:18]
I checked with Summit. I checked with H
[47:21]
Heartland. I checked with Wales. Um, no
[47:24]
one All homeowners pay their own grinder
[47:26]
pump fees. There was one that has four
[47:29]
grinder pump has one grinder pump for
[47:32]
four homes and we as a district decided
[47:34]
we didn't want to do that. We've never
[47:36]
done that. They have the each their own
[47:37]
grinder pump. But again, the homeowner
[47:40]
pays for the grinder pumps because I
[47:43]
I've been told by one of the gentlemen
[47:45]
that they consider it private property
[47:47]
just like a well pump is, a septic pump
[47:49]
is, and so forth. We don't have anybody
[47:52]
coming out and paying our well pump
[47:54]
costs or anything. And um we have um the
[47:58]
first we have discussed this subject at
[48:00]
this level before. The public works
[48:01]
committee has reviewed the topic of
[48:03]
grinder pumps twice. The first time they
[48:06]
gave a recommendation to put the
[48:07]
responsibility on the homeowner and and
[48:10]
just I just
[48:11]
>> when was when was that?
[48:12]
>> Um I don't have the dates.
[48:14]
>> Okay.
[48:14]
>> I got this from Dan. I don't have the
[48:16]
dates. I know in the old district
[48:21]
that we had we had a threeperson
[48:23]
committee. two of us uh wanted the
[48:26]
homeowner to pay their own and one of us
[48:30]
didn't and we had a whole bunch of
[48:32]
people here from Wooded Hills and I
[48:35]
won't go into detail how they know to
[48:36]
come here but we had a whole bunch of
[48:38]
people kind of vote um he was very
[48:40]
serious he said no we shouldn't have to
[48:42]
pay for those he was overwhelmed by the
[48:45]
people he voted and changed his vote
[48:47]
that night we could have gotten this
[48:49]
taken care of very nicely that night
[48:50]
years ago and he changed his vote unfort
[48:53]
Unfortunately, he told me he was
[48:55]
overwhelmed.
[48:56]
>> This This is This is on the the uh the
[49:00]
sewer board.
[49:03]
>> The village the town board or the
[49:05]
>> No, no, the village. I'm all talking
[49:07]
about the sewer board, not the village.
[49:08]
>> You said they made a recommendation
[49:09]
though to the v or to the I'm not sure
[49:11]
if it's the village board or to board.
[49:13]
>> To the public works committee. I don't
[49:15]
know. It was a couple months ago maybe.
[49:17]
And during that conversation, um, the
[49:20]
board had mentioned that they had
[49:23]
already made a recommendation and the
[49:25]
board didn't take a either they didn't
[49:26]
take action on it or they didn't vote on
[49:28]
it or
[49:28]
>> I'm just looking to see how far back
[49:30]
that that previous one was just for
[49:32]
reference. I know it was before
[49:34]
>> Rob and I were here. Was it was it
[49:36]
>> been before you were here? And then also
[49:39]
um when I asked at the at the utility
[49:42]
board meetings, nope, you have to go to
[49:44]
the village board again. we have to
[49:46]
start there and so it's kind of a back
[49:48]
and forth thing and you know it's kind
[49:51]
of frustrating.
[49:52]
>> Well there that committee had stated
[49:54]
that they had already made a
[49:56]
recommendation so they weren't going to
[49:58]
make another recommendation.
[49:59]
>> They made a recommendation to the
[50:01]
village board as far as
[50:03]
>> what they wanted.
[50:04]
>> I'm confused really confused is who
[50:06]
actually made what board actually makes
[50:08]
this decision.
[50:10]
Is it the village board or is the
[50:12]
utility?
[50:15]
» I I mean I could answer that in my
[50:17]
opinion, but I that's surface
[50:18]
>> up. The village board uh has say a say
[50:22]
in amending the sewer code, which is
[50:25]
that code provision that I sent over to
[50:27]
you. So it would be a village board that
[50:29]
would make that decision to modify that
[50:31]
section code. Um it could be a
[50:34]
recommendation from the public works
[50:36]
committee to bring to the village board,
[50:37]
but again they um
[50:41]
>> they didn't really do any any action the
[50:43]
second time because they had stated they
[50:45]
had already taken this item up.
[50:47]
>> Exactly.
[50:47]
>> In previous years.
[50:48]
>> Exactly. And
[50:49]
>> I'm a little bit lost. So, so yeah, the first time around the sanitary
[50:55]
district board voted 2 to one to to
[50:59]
recommend this change to the village
[51:02]
board or town board at the time, but
[51:04]
then someone flipped. So, it was
[51:05]
actually a recommend It was a
[51:07]
recommendation that it not so positive
[51:09]
recommendation never made it to the
[51:10]
village board then.
[51:11]
>> No, it didn't because it didn't come out
[51:13]
of the lo of the of the old district
[51:16]
board, the old board. It didn't come out
[51:18]
of there because Mark flipped flipped
[51:21]
and so it just sat there and this was
[51:24]
Oh, I don't I I wish I had a date on my
[51:26]
notes. I don't have a date on this when
[51:28]
I when I made this presentation.
[51:32]
>> So, I guess I guess I'm and I don't have
[51:34]
an I mean, you guys are more educated on
[51:36]
this than I am, but I'm just trying to
[51:37]
make sure I understand everything,
[51:38]
right? So the so this the the second to
[51:42]
last paragraph the end of the second
[51:45]
line where it says the first time they
[51:46]
gave a recommendation to put the
[51:47]
responsibility on the homeowner.
[51:49]
>> But if I'm following you though that that that never was the final
[51:53]
recommendation of the
[51:55]
>> it was they they've told me now that am
[51:58]
I correct Mark maybe I'm wrong. When I
[52:00]
bring it up at the utility level they
[52:02]
say you got to bring you got to bring it
[52:03]
back to the village board. And so you
[52:06]
know so it's kind of confusing. I am
[52:08]
confused because it's gone back and
[52:10]
forth.
[52:11]
>> Well, you've done a good job of
[52:12]
confusing me as well. So, I I don't I
[52:14]
I'm I'm not following. I I don't know.
[52:16]
>> So, was there a positive The discussion
[52:19]
that we had at public works, Mark, even
[52:21]
correct me if I'm wrong, was that they
[52:23]
didn't want to take action on it because
[52:24]
they had already made I don't know if
[52:27]
they made a motion or a recommendation
[52:29]
to the village board. I don't know what
[52:30]
happened at the village board level. I
[52:32]
didn't look through the minutes to
[52:33]
determine what happened and I don't know
[52:34]
when that was. I would assume it was
[52:37]
when both um
[52:40]
I think the trustees named Jane and
[52:44]
>> Joe thank you were on the committee so
[52:48]
long
[52:49]
>> this happened I want to say winter or
[52:52]
something like that that this happened
[52:55]
um because I was told and Mark and I
[52:57]
talked about this wait until we redo the
[53:01]
code you know so I've been kind of
[53:03]
putting it off thinking I need to do
[53:05]
that. So, it would maybe save money to
[53:07]
redo this. I'm not sure. I know. I know.
[53:11]
Couple years ago we voted to any new
[53:15]
resident that comes on pays for their
[53:17]
own costs.
[53:20]
So, that's but we haven't really had
[53:22]
many new residents, you know. But I also
[53:25]
want to point out um we since 23 we have
[53:29]
paid $64,899.28.
[53:34]
In addition to that,
[53:37]
um, we have the de we have to have our
[53:40]
nick and anybody on board. We have to
[53:42]
pay them to go out and get the pump and
[53:44]
replace the pump and so forth. So,
[53:46]
there's a lot of other expenses involved
[53:48]
in this. And if the homeowner does it,
[53:50]
they're in charge of it. They can get
[53:52]
things done probably a lot cheaper than
[53:54]
what we do, you know, and they can have
[53:56]
some and they can take care of it. They
[53:59]
can take care because they really don't
[54:01]
take care of it. It's not for them to do
[54:03]
anything with it. It becomes private
[54:05]
property just like you guys look over,
[54:08]
you know, our things at home. We take
[54:11]
care of things. And I just think I just
[54:14]
think it's an expense that's been on for
[54:16]
37 years. And I think 37 years is a long
[54:21]
time. The only thing that I would
[54:23]
recommend is if there was any any
[54:26]
homeowner
[54:28]
that has been on this from day one, if
[54:31]
they've never replaced their grinder
[54:33]
pump, we should replace it
[54:36]
because, you know, if that was fair, if
[54:39]
everyone decided to do that, but
[54:41]
otherwise, I would cut it off
[54:42]
immediately because why why just stretch
[54:45]
it out myself? And so then I'm asking
[54:48]
that we um that uh that the next village
[54:52]
board meeting that we bring up the code
[54:53]
of ordinances for the sewer sewer
[54:56]
service area be revised to reflect the
[54:58]
grinder pump's costs are totally paid by
[55:00]
each homeowner for their respective
[55:02]
grinder pump. And I have to tell you,
[55:04]
we'll have people here from Wooded
[55:05]
Hills. We will. But there again,
[55:08]
everybody else in the district does not
[55:10]
know what's going on. If they knew what
[55:13]
was going on, they'd be here as well. So
[55:15]
I'm not overwhelmed when people are in
[55:17]
the off a audience because we have to do
[55:20]
what's best for the majority of the
[55:21]
people, not the minority of the people.
[55:24]
This whole sewer
[55:27]
issue was pushed through.
[55:31]
Let's just not say it was right how they
[55:33]
pushed it through. They forced it down.
[55:36]
And there was no total vote. It was a
[55:38]
three-man committee. Threeman committee
[55:41]
that pushed this on. One put an
[55:43]
ingground hole in, cut into a septic
[55:45]
system, had no room for anything else.
[55:48]
The other one bought a bought a hole and
[55:49]
they didn't check out their septic
[55:51]
system, failed. So, two of the three
[55:54]
members had failing systems. That's why
[55:55]
this was pushed through.
[55:58]
And it makes me very uncomfortable as a village board member today and all
[56:03]
the work that have been on the board
[56:04]
that someone can be so crooked to do
[56:06]
that because I will vote for something
[56:08]
that if it's right for the village, then
[56:11]
we do it. I don't care if it cost us
[56:12]
money. It has to. We have to like for
[56:14]
the parks and everything else. You have
[56:16]
to do what's best for the area. But what
[56:19]
happened years ago was wrong, people.
[56:21]
Well, it was wrong
[56:23]
>> in regards to the grinder pumps.
[56:25]
>> Regard to the whole sewer and the
[56:27]
grinder pumps was a private issue. It
[56:29]
was never brought up at any of these
[56:31]
public meetings. I have to tell you,
[56:33]
Matt, it was never brought up. And even
[56:36]
you know
[56:38]
and because I think they sold that on
[56:40]
the fact that you know they would make
[56:44]
not because these people lived in Wooden
[56:46]
Hills all three of them
[56:48]
>> so we wouldn't have angry neighbors.
[56:50]
>> Your requested motion is you you have it
[56:52]
here. I mean, this you'd like to do at
[56:54]
the next meeting, but then you you said
[56:55]
you'd like to change it a little bit so
[56:57]
that
[56:57]
>> Well, I would I would be in favor of
[56:59]
changing it for an original homeowner
[57:02]
who's not ever had a grinder pump and
[57:06]
not ever had a grinder pump replaced.
[57:08]
We're not talking many people.
[57:10]
>> Well, out of the 432 or 452, how many
[57:12]
would that be?
[57:13]
>> No, no, no. 452. Only 32 have grinder
[57:16]
pumps.
[57:16]
>> Oh, so out of the 32, how many would
[57:19]
>> We only have a couple. I was told at one
[57:21]
time it was when I did this it was only
[57:23]
a couple people.
[57:24]
>> Why to replace them if they're not
[57:26]
busting?
[57:27]
>> Exactly. But if they come and they have
[57:29]
an issue, then I think myself I think
[57:33]
the the sewer fund should pay for it if
[57:35]
they're the original homeowner and has
[57:38]
never had it done. That's the only thing
[57:40]
I'm saying to be fair to everybody
[57:42]
because I Where's my list?
[57:45]
>> Well, because because other people have
[57:46]
benefited from it. So
[57:47]
>> Oh my gosh. So then why should you
[57:50]
>> 32 homeowners have benefited from it and
[57:52]
there's sometimes it's been a couple
[57:54]
times,
[57:56]
>> right? So not not there's 32 grinder
[57:58]
pumps but not all of them have had been
[58:00]
replaced. So there's been 20ome that
[58:03]
have that have had them replaced is what
[58:04]
you're
[58:05]
>> most the majority of them have have had
[58:07]
it replaced.
[58:08]
>> So I'm just using them. So okay.
[58:09]
>> Yeah, that majority of them had it
[58:11]
replaced. I was just trying to do what's
[58:14]
right for those homeowners that have
[58:16]
never had the sewer fund. I say sewer
[58:20]
fund because I was told the name of
[58:21]
that, not the utility. It's the sewer
[58:24]
fund. You know who I'm talking about. Um
[58:26]
anyway, so that's um the sewer fund
[58:29]
should pay for those original homeowner
[58:31]
who has never had the grinder pump
[58:32]
replaced. And that's only a couple
[58:35]
people though. I have to I have to
[58:37]
confess it's not a lot.
[58:39]
>> Would there be any legal issue around
[58:40]
that? Yeah.
[58:41]
>> So it
[58:44]
>> um
[58:44]
>> otherwise everybody gets to it. We turn
[58:46]
off everybody.
[58:47]
>> I think that would be a cleaner way to
[58:48]
do it. It just cut everybody than
[58:50]
>> I was just trying to be fair. That's
[58:51]
fine.
[58:53]
>> So uh at the time municipal law
[58:55]
litigation attorney Macy opined on this
[58:58]
in a letter dated May 8th, 2024.
[59:02]
Um, Dan, I'll ask you I'll ask that you
[59:05]
send this to the board for their
[59:06]
consideration, but uh, Attorney Macy did
[59:10]
note the following uh, in regards to
[59:12]
grinder pumps and costs. Um, you
[59:15]
reference a policy that was written in
[59:17]
1992. However, the attached documents
[59:19]
only include a 1989 letter from the
[59:21]
district chairman setting forth the
[59:22]
financing plan for the district's
[59:23]
distributions of sewer costs. Assuming
[59:26]
you are referencing this letter, there
[59:27]
is nothing that specifically references
[59:29]
grinder pumps installation or
[59:30]
maintenance costs. Therefore, it is
[59:31]
unclear who would be responsible for
[59:34]
grinder pump replacement and
[59:35]
maintenance. The July 2020 sanitary
[59:38]
district ordinance you s you provide is
[59:40]
unsigned.
[59:42]
Assuming there is a signed version and
[59:44]
this ordinance was put into effect, the
[59:46]
language states clearly that the
[59:48]
district is only responsible for
[59:50]
maintenance and replacement of grinder
[59:52]
pumps installed by the district prior to
[59:54]
July 1st, 2020. Mhm.
[59:56]
>> Property owners are responsible for
[59:58]
costs of all grinder pumps installed
[1:00:00]
post July 1st, 2020.
[1:00:02]
>> Right.
[1:00:03]
>> That be most of I mean that might be all
[1:00:04]
of them.
[1:00:05]
>> I also note that language in section
[1:00:07]
1805 sub4 of the village draft sewer
[1:00:10]
code clearly states that the cost of
[1:00:12]
installation and maintenance of the
[1:00:13]
grinder pumps is a responsibility of the
[1:00:15]
property owner.
[1:00:17]
My recommendation would be to include
[1:00:19]
language in the new sewer code including
[1:00:22]
reference to the list of grandfather
[1:00:24]
properties potentially including the
[1:00:27]
language from the code and list as
[1:00:30]
exhibits. For example, you could create
[1:00:32]
section 1805 sub4 subd, which would
[1:00:35]
state something such as, "All grinder
[1:00:38]
pumps installed by the town of Lisbon
[1:00:40]
sanitary district number one prior to
[1:00:42]
July 1st, 2020 shall be maintained,
[1:00:45]
repaired, and replaced by the village of
[1:00:47]
Lisbon, pursuant to town of Lisbon,
[1:00:49]
sanitary district number one, sewer
[1:00:50]
service code section 1.14,
[1:00:54]
C. Exhibit A. The only parcels eligible
[1:00:56]
for maintenance, repair, or replacement
[1:00:58]
of a grinder pump by the Village of
[1:01:00]
Lisbon are listed in exhibit B. No
[1:01:02]
additional parcels shall be added to
[1:01:04]
that list.
[1:01:06]
So that was in 2024. And I think what
[1:01:09]
Linda's referencing is that that was not
[1:01:12]
legally adopted by the board because the
[1:01:15]
board has yet to
[1:01:17]
um has yet to attach a new sewer service
[1:01:21]
code.
[1:01:22]
>> Right. And that's I talked to Kathy a
[1:01:24]
couple times before Dan got it. I said,
[1:01:25]
'When are you going to do this? And she
[1:01:27]
because of everything else being
[1:01:29]
becoming v the village. I understand.
[1:01:31]
She said she didn't have time to do
[1:01:33]
this.
[1:01:35]
>> Did the board vote? So three of the
[1:01:37]
three of you were here. Did you vote on
[1:01:39]
this at that time?
[1:01:39]
>> No, no, no, no. I'm the only one.
[1:01:41]
>> No, no. But did this come to the to the town board in in in uh July or in
[1:01:47]
2024?
[1:01:49]
It did uh for discussion, but it did not
[1:01:52]
um
[1:01:54]
>> it did not become approved because
[1:01:56]
therefore the referenced exhibits and
[1:02:00]
code had not yet been codified or
[1:02:02]
created under the new
[1:02:03]
>> right
[1:02:04]
>> sewer ordinance. Um Dan, I guess
[1:02:06]
administratively, can you speak to the
[1:02:08]
difference that the committee has held
[1:02:10]
off on?
[1:02:12]
Well, the reason that we're taking off
[1:02:14]
on doing work on the sewer code itself
[1:02:17]
is because we're going through a sewer
[1:02:19]
service area amendment right now. So, we
[1:02:21]
potentially could have new policies in
[1:02:23]
place that are going to are going to be
[1:02:25]
related to um connection fees and
[1:02:29]
whatever else that goes along with sewer
[1:02:31]
service expansion because of the fact
[1:02:34]
that we time anticipated that Highway K
[1:02:37]
was priority for getting sewer gravity
[1:02:40]
sore for this pool. Mhm.
[1:02:42]
>> So that's why we held off thinking that
[1:02:44]
would be an a 12 to 18 month process and
[1:02:46]
that we would probably already be
[1:02:48]
opening up the code for amendment. But
[1:02:51]
that process is a little slower than
[1:02:54]
anticipated um
[1:02:55]
>> years slower and it's costing actually
[1:02:58]
it's costing the sewer fund money by
[1:03:00]
pushing it off and that's why I'm trying
[1:03:02]
to say can't we just pass you know a
[1:03:05]
change to the ordinance at this point
[1:03:07]
and do it. So, was the board were the
[1:03:09]
three of you in favor of making that
[1:03:12]
change when the code was rewritten or
[1:03:15]
>> It wasn't rewritten.
[1:03:16]
>> No, when it was going to be down the
[1:03:18]
line. Was was that was do you guys rec
[1:03:21]
was I mean again if it was just
[1:03:22]
discussion item there was no formal
[1:03:24]
action but was the three or five board
[1:03:27]
members in favor of that or not?
[1:03:31]
I guess it doesn't matter too much, but
[1:03:32]
>> I believe they were. And I also I also
[1:03:35]
was was asked why let's wait until it's
[1:03:39]
codified or whatever because it's going
[1:03:41]
to save money. However, can't we now it
[1:03:45]
been so long? It's how long has Kathy
[1:03:47]
been gone? You know, how long has Dan
[1:03:50]
been here? It's just an ongoing thing. I
[1:03:52]
just say, let's just get going on this.
[1:03:54]
Make the change and let's get going and
[1:03:56]
let's just make whatever has to be done.
[1:03:58]
I'm just kind of frustrated with it.
[1:04:00]
Truthfully, I feel like I'm the only one
[1:04:02]
sitting out here watching out for the
[1:04:04]
sewer fund. Truthfully,
[1:04:06]
>> would we have to do a public meeting
[1:04:08]
about it? Because it would
[1:04:10]
>> No, it's not an amendment to the zoning
[1:04:11]
code, so you don't need to do a public
[1:04:13]
hearing.
[1:04:14]
>> But would it be wise to do something
[1:04:16]
instead of just
[1:04:18]
>> if you just cut everyone off from
[1:04:20]
grinder pump repair? Uh, you might get
[1:04:23]
quite a bit of
[1:04:24]
>> You might get wooded hills here. They
[1:04:25]
will be you're going to get I mean
[1:04:27]
that's fine just as long as they know
[1:04:28]
without doing it.
[1:04:29]
>> You're going to get people after the
[1:04:30]
fact thinking that the board did
[1:04:33]
something that
[1:04:34]
>> I think they should be maybe set letter
[1:04:37]
sent to them that this is what we did or
[1:04:39]
whatever just to notify them because
[1:04:41]
they need to know in case something goes
[1:04:43]
with theirs that they don't call
[1:04:44]
delellic if it goes off at 6:00 in the
[1:04:47]
morning if it was theirs. They might
[1:04:49]
wait till 8:00 in the morning to call a
[1:04:51]
plumber and say, "Hey, I've got an
[1:04:53]
issue." Rather than whatever. That's
[1:04:56]
all.
[1:04:58]
That's This is all
[1:05:00]
my experience and I'm relaying that like
[1:05:02]
Mark says, I'm an odd duck out here
[1:05:04]
because I know what happened in the very
[1:05:06]
beginning.
[1:05:07]
>> I said you're an odd duck.
[1:05:08]
>> You did what?
[1:05:11]
>> You did. I don't know. Quite a while
[1:05:13]
ago.
[1:05:15]
>> I think we're all odd ducks. I mean,
[1:05:16]
everyone's got their odd duck. I admit
[1:05:18]
I'm an odd duck, but I I do and as you
[1:05:21]
guys know, I do watch the money.
[1:05:23]
>> I'm I'm very not for what's best for the
[1:05:26]
village. I'm really do that's one of my
[1:05:28]
big things. And this is we have to be
[1:05:30]
honest to we have to be fair to the 452
[1:05:34]
current users. That's all.
[1:05:37]
>> We paid enough after 37 years. I guess
[1:05:38]
if we're if we're going to talk about
[1:05:40]
fair, we we the last line that I said
[1:05:44]
about this, the July 1st, 2020 date was
[1:05:47]
a was a um it wasn't just a board
[1:05:51]
decision. It was it it was a very
[1:05:53]
in-depth it included public input. It
[1:05:56]
included council review. It included
[1:05:59]
recommendations from the sitting board
[1:06:01]
members. So, um I I guess there there's
[1:06:05]
really nothing that has changed since
[1:06:07]
the board. Um and I'll just say they
[1:06:11]
opined that we never formally motioned
[1:06:13]
or approved an ordinance change. So,
[1:06:15]
I'll just say it was opined and that was the I guess agreement that we
[1:06:20]
came to a consensus. Now, that was a
[1:06:22]
different board, but I don't think
[1:06:24]
there's anything overwhelmingly changing
[1:06:26]
since then. Um there's there's a lot of
[1:06:31]
lack of documentation from the inception
[1:06:33]
of the system to really explain
[1:06:36]
>> what happened and why it happened. And
[1:06:39]
I think it was a very responsible
[1:06:41]
decision that the board came to
[1:06:44]
and just for a lack of better terms, the
[1:06:46]
code wasn't ready to be rewritten. So
[1:06:48]
the board didn't the board didn't take
[1:06:50]
action on it. and we we knew we were
[1:06:52]
taking a new board into consideration
[1:06:55]
and and that was the choice of that
[1:06:57]
current board to leave it open. So, uh
[1:07:02]
>> yes, we we we know that it cost money,
[1:07:04]
but it also
[1:07:07]
saved the then sanitary lots of money in
[1:07:12]
the front end because of how they
[1:07:14]
designed the system.
[1:07:17]
Are you talking about the original
[1:07:19]
engineers?
[1:07:21]
>> Yeah, I mean
[1:07:22]
>> Oh, no, you're wrong.
[1:07:23]
>> The the uh
[1:07:24]
>> there were a lot of mistakes that they
[1:07:26]
made.
[1:07:28]
>> I guess what I'm Let me clarify make
[1:07:30]
more sense. There was design standards
[1:07:32]
that were used that we can't prove why
[1:07:34]
they were or weren't used, but
[1:07:37]
>> it has been the recommendation of our
[1:07:38]
engineers today that these design
[1:07:41]
standards would have never
[1:07:42]
>> been utilized. And to whose fault that
[1:07:44]
was? Was it the sanitary? Was it the
[1:07:46]
village or
[1:07:47]
>> it's the engineers that we hired to do
[1:07:49]
the proper work?
[1:07:50]
>> Right. But they they were something we
[1:07:53]
inherited.
[1:07:54]
>> Exactly. And that's why we need to move
[1:07:56]
on. I don't I myself I don't want to go
[1:07:59]
through we've been through this process
[1:08:01]
before. We have paid the attorney. We
[1:08:03]
have paid this and we have paid that. To
[1:08:06]
me, I just want it on the books. If
[1:08:08]
either yes, we do it or no, we don't. I would like it. I would like it on the
[1:08:12]
books. We do it because it's been
[1:08:14]
stretched out so far. This has been from
[1:08:17]
1920. Okay. The 2020 1920 2020 is maybe
[1:08:21]
when this whole thing started and we've
[1:08:24]
been waiting six years so far. Six years
[1:08:27]
so far. And I don't want another two and
[1:08:30]
three and four years and going through
[1:08:31]
the same thing.
[1:08:34]
I I'm not for that. I'm tired. I'm tired
[1:08:37]
of pain.
[1:08:40]
I don't want to talk about personal. I'm
[1:08:42]
talking about the sewer fund residents.
[1:08:45]
I don't want to see them pay any more
[1:08:47]
than they have to. To me, you know, just
[1:08:50]
very unfair. I would like to see this
[1:08:52]
ended myself.
[1:08:54]
>> Are you are you in uh disagreement with
[1:08:56]
the what the attorney recommended that
[1:08:58]
the board adopt? Mhm. Because I don't at
[1:09:02]
the time there was a lot of question
[1:09:04]
about we talked about oh what is he you
[1:09:06]
know we didn't kind of think about that
[1:09:09]
you know what his we were kind of
[1:09:11]
surprised at what he said.
[1:09:13]
>> Can you explain what the attorney
[1:09:14]
recommended? Hi.
[1:09:16]
>> All grinder pumps installed by the Town
[1:09:18]
of Lisbon Sanitary District number one
[1:09:20]
prior to July 1st, 2020 shall be
[1:09:22]
maintained, repaired, and replaced by
[1:09:24]
the Village of Lisbon pursuant to the
[1:09:26]
Town of Lisbon Sanitary District number
[1:09:28]
one, sewer service code section 1.14.
[1:09:31]
C. Exhibit A. The only parcels eligible
[1:09:34]
for maintenance, repair, or replacement
[1:09:36]
of a grinder pump by the Village of
[1:09:38]
Lisbon are listed in exhibit B. No
[1:09:41]
additional parcel shall be added.
[1:09:43]
>> So essentially, what's already
[1:09:46]
Except that the exhibit is not in the
[1:09:48]
code.
[1:09:48]
>> Neither exhibit are in the code. How
[1:09:50]
many houses are he is he talking about
[1:09:52]
in the exhibit?
[1:09:54]
>> Uh there's like
[1:09:56]
>> grandfathered 32 comes to mind.
[1:09:59]
>> That would be grandfathered.
[1:10:00]
>> 32
[1:10:02]
that we would that we would have to
[1:10:04]
maintain.
[1:10:05]
>> But now don't forget this
[1:10:08]
>> 30 some to start with.
[1:10:09]
>> Yeah. Don't forget
[1:10:10]
>> we haven't had any new grinder pumps
[1:10:12]
added.
[1:10:13]
>> No. No. That's what I said. Um, don't
[1:10:15]
forget now these homes have changed
[1:10:18]
hands over the years. Changed hands over
[1:10:21]
the years. So there's I don't feel an
[1:10:24]
allegiance to those myself that the
[1:10:27]
people that actually paid their money to
[1:10:29]
go in and have the sewer installed.
[1:10:33]
Those homeowners are gone. Rick and I
[1:10:36]
have been in our house 51 years, so
[1:10:38]
we're a little older, but most houses
[1:10:40]
have changed hands all this time. I just
[1:10:43]
would like to I would just like I'd like
[1:10:45]
to get this taken care of. I'm asking
[1:10:47]
for your help to do that.
[1:10:48]
>> I don't think it should be forever.
[1:10:51]
>> What's forever?
[1:10:52]
>> The grandfathered ones get replaced
[1:10:54]
until the house part down.
[1:10:56]
>> No, I Are we reading this?
[1:10:58]
>> Yeah. I think uh
[1:11:00]
>> it sounds weird.
[1:11:01]
>> Yeah.
[1:11:02]
>> At most I could see you get one last
[1:11:04]
replacement, check you off the list, you
[1:11:05]
got replaced and you're done. No, I I
[1:11:08]
myself think, well, why wouldn't in 2020
[1:11:11]
that should have been happen because we
[1:11:12]
and it was at a standstill on
[1:11:14]
everything. So, it's costing the
[1:11:16]
district more money and more money every
[1:11:18]
time someone gets a grinder pump repair
[1:11:20]
that we shouldn't have had replaced. And
[1:11:22]
I guarantee you our costs are going to
[1:11:25]
go up this fall. I know they're going to
[1:11:27]
go up to pay for all those grinder
[1:11:28]
pumps.
[1:11:29]
>> What's the significance of 2020? Why is
[1:11:32]
there Why is that the cut off? That was
[1:11:34]
when we That was when we were at town
[1:11:36]
and first did the we did a public
[1:11:39]
meeting and and that was the date that
[1:11:41]
we decided. Yep.
[1:11:43]
>> Was the
[1:11:43]
>> It was picked out by who? I have no I
[1:11:46]
didn't pick it out.
[1:11:47]
>> It was by the town board.
[1:11:48]
>> Yeah.
[1:11:48]
>> So, I guess I want to make sure I
[1:11:50]
understand. So, is are we talking about
[1:11:52]
if you have a new grinder pump system
[1:11:56]
installed or are we talking about if you
[1:11:58]
actually have the actual pump is
[1:12:00]
replaced then it's then it's considered
[1:12:02]
new. But
[1:12:03]
>> everything
[1:12:04]
>> I think no there's a distinction in
[1:12:06]
there and I think that's where I said
[1:12:07]
something and then you correct and you
[1:12:09]
corrected me. I'm not
[1:12:10]
>> I I'm I'm absolutely with you Matt. The way we remove that is we we got into
[1:12:15]
a long debate about what is transfer of
[1:12:18]
ownership. You know what happens if
[1:12:19]
somebody has say just for term a husband
[1:12:24]
wife want to transfer their property
[1:12:26]
from their name to a trust.
[1:12:29]
>> Is that a transfer of ownership? Mhm.
[1:12:31]
>> Our attorney at the time advised that
[1:12:33]
you do not want to get into
[1:12:36]
>> those because that will create
[1:12:37]
individual cases of review,
[1:12:39]
>> right?
[1:12:39]
>> So, you know, if if you had one and you
[1:12:43]
changed from being just a singular
[1:12:45]
person to a trust,
[1:12:47]
>> is that transfer of ownership because
[1:12:49]
you now entrusted it to somebody?
[1:12:52]
He said he said at the time it was not
[1:12:54]
worth the legal review fees or court
[1:12:57]
battles to do that. So that's why that's
[1:12:59]
why we picked just a singular date. And
[1:13:02]
even if you've had four grinder pumps
[1:13:05]
replaced prior to
[1:13:07]
the July 1st, 2020,
[1:13:10]
um you you only get one more because it
[1:13:13]
would be after that date.
[1:13:16]
>> So
[1:13:17]
>> one more after the date.
[1:13:18]
>> Yeah. So say say you had four installed
[1:13:21]
prior to July 1st, 2020.
[1:13:24]
>> We we had been paying for those.
[1:13:25]
>> This is coming back to me now. And now
[1:13:28]
you want your fifth grinder pump.
[1:13:30]
>> Okay,
[1:13:31]
>> post July 1st, 2020.
[1:13:33]
>> That would be your last one forever.
[1:13:35]
Doesn't matter about transfer of
[1:13:36]
ownership. Doesn't matter if your house
[1:13:38]
burns down. Doesn't matter if somebody
[1:13:39]
steals your grinder from
[1:13:41]
>> right
[1:13:45]
» the cost of everything. You never know.
[1:13:46]
>> Yeah. But I guess what I'm saying is
[1:13:48]
that's why we didn't want to get he
[1:13:50]
recommended to keep it clean and clear
[1:13:51]
so that we did not get any into any
[1:13:53]
lurggious battles of of that kind.
[1:13:57]
>> If you make a date, it doesn't matter
[1:13:58]
what the scenario is.
[1:14:00]
>> You you have a date.
[1:14:01]
>> Oh, that makes what I was talking about.
[1:14:03]
>> And
[1:14:04]
>> so basically, we would we would
[1:14:05]
potentially have to replace every pump.
[1:14:09]
>> Yeah.
[1:14:09]
>> No, no, because there is there has been
[1:14:11]
several replaced post 2020 that would
[1:14:14]
never get replaced again.
[1:14:14]
>> Okay. So, how many are we talking about?
[1:14:17]
>> I don't have an updated list. My last
[1:14:18]
list is from 2021.
[1:14:20]
>> There was 32 gr 32 grinder pumps.
[1:14:22]
>> No, that that that 32 that 32 is not
[1:14:26]
>> a qualifying list. That is an incumbent
[1:14:28]
list of all grinder pumps. That is not an eligible list.
[1:14:32]
>> Okay. I'm just I'm just looking for what
[1:14:33]
the total liability.
[1:14:36]
>> He's saying who would be who could be
[1:14:38]
>> the liability.
[1:14:40]
I think that's complicated myself.
[1:14:42]
>> Then come up with come up with a better
[1:14:44]
scenario. But that but that was I guess
[1:14:47]
you're just saying shut the faucet off
[1:14:48]
on these people.
[1:14:49]
>> It's been it's been six years since this
[1:14:51]
has been going on as you know. We just
[1:14:52]
read to me I just cut it off. I would
[1:14:55]
just cut it off.
[1:14:56]
>> You would just cut it off or you would
[1:14:58]
say that someone who hasn't gotten one
[1:15:00]
in the past gets still gets one.
[1:15:01]
>> Well that's what I said but
[1:15:02]
>> No. And which Okay. Well I mean yeah. So
[1:15:04]
there I guess there's a minor difference
[1:15:06]
but
[1:15:06]
>> Okay. I'm okay with if someone has never
[1:15:09]
had the grinder pump
[1:15:12]
replaced. Do we say from the original
[1:15:14]
owner?
[1:15:16]
>> No. So that that is that is not going to
[1:15:18]
work. We've already explored that
[1:15:19]
because we do not have we do not have
[1:15:22]
quality records to prove or disprove.
[1:15:25]
>> Therefore, the attorney recommended we
[1:15:26]
do not get into that battle because
[1:15:28]
>> one our records are horrible
[1:15:30]
>> and two now we're battling ownership
[1:15:33]
again.
[1:15:33]
>> I know.
[1:15:34]
>> So he that's why the date came and and
[1:15:36]
that was that was the
[1:15:37]
>> Yeah, I remember that.
[1:15:40]
But we've done 10 of them in the last
[1:15:42]
six years.
[1:15:43]
>> Yeah, there two of them I know of this
[1:15:45]
year that we've done that we just did
[1:15:47]
one again.
[1:15:48]
>> Yeah. So once I update
[1:15:50]
>> $5,000 we just did another one.
[1:15:53]
>> So if this went to the utility committee
[1:15:56]
meeting next time for an actual
[1:15:59]
recommendation and not that it has to,
[1:16:00]
but if if it did,
[1:16:02]
>> they said they they've said
[1:16:04]
>> it was you said they made a
[1:16:05]
recommendation. Was the recommendation
[1:16:07]
to make this change or was the
[1:16:09]
recommendation to not make the change? I
[1:16:11]
mean, you can recommend it either way.
[1:16:13]
>> The recommendation was that
[1:16:15]
>> which that went to the board and the
[1:16:17]
board chose not to
[1:16:19]
>> place it in code.
[1:16:20]
>> This because because of
[1:16:21]
>> No, the previous board.
[1:16:23]
>> Yeah.
[1:16:23]
>> Not not this current sitting
[1:16:24]
>> because of because of the principle of
[1:16:26]
it or because of the logistics of the
[1:16:31]
>> logistics. Okay. The principle they were
[1:16:33]
not opposed to. No,
[1:16:34]
>> but but they were also at the end of
[1:16:36]
their terms and didn't want they wanted
[1:16:38]
it to be up to the next board.
[1:16:40]
>> Yeah.
[1:16:41]
>> And here we are.
[1:16:44]
>> Well, if we're if we agree with it in
[1:16:45]
principle, this is the reason people
[1:16:47]
think government's dopey because we're
[1:16:49]
just going to like not do it because
[1:16:51]
it's not convenient for a code thing.
[1:16:53]
We're doing it because it's right or
[1:16:54]
it's wrong. We're doing it or we're not
[1:16:56]
doing it because it's right.
[1:16:57]
>> What's what's the requirement of what has to happen in the code? I mean,
[1:17:00]
is is it is it that much of a burden? I
[1:17:03]
mean honestly we have if every grinder
[1:17:05]
pump ad installed after 2020 you install
[1:17:09]
it once and you never install it again.
[1:17:10]
I mean you could consider just
[1:17:12]
installing all the grinder pumps and
[1:17:14]
then be done with it but otherwise no
[1:17:17]
the code you would have to modify or
[1:17:20]
remove that section of code and then
[1:17:22]
just remove liability. So you
[1:17:26]
>> and we just added to it when it when
[1:17:28]
everything is changed.
[1:17:29]
>> So you modify section 32.05 5 U par D
[1:17:34]
par five that's where it references the
[1:17:36]
July 1st 2020 deadline and then say all
[1:17:39]
grinder pumps be prepared and maintained
[1:17:43]
by owners
[1:17:44]
>> and that just requires a vote of the
[1:17:47]
board.
[1:17:48]
>> Yep.
[1:17:48]
>> Yes.
[1:17:49]
>> I guess we got to figure out if we want
[1:17:50]
to do the everybody gets one free
[1:17:54]
>> that July 1st 2020 date in there makes
[1:17:56]
sense.
[1:17:56]
>> No, not to me. I'm sorry. Well, no. You
[1:17:58]
know how again how do you
[1:18:00]
>> I would just I myself I wouldn't even
[1:18:03]
give it a date. Like if you put okay
[1:18:05]
let's give them a little time January
[1:18:07]
1st. Well what happens to those there's
[1:18:09]
people on January 2nd they're going to
[1:18:10]
complain that they're not that theirs
[1:18:12]
isn't replaced. We're always going to
[1:18:14]
have a problem with the date.
[1:18:15]
>> So it's it's either July 1st 2020 or
[1:18:17]
it's no nothing. No one gets one
[1:18:20]
>> with the the reason why we didn't post
[1:18:23]
like set a date to be eclipsed in the
[1:18:25]
future is because of the fact that there
[1:18:29]
would be people qualifying that would
[1:18:31]
run
[1:18:33]
>> anything and everything down their
[1:18:34]
grinder boat.
[1:18:35]
>> Yes. And break it
[1:18:36]
>> intentionally sabotage it. And now we
[1:18:38]
are on the burden to prove or disprove
[1:18:41]
>> Yeah.
[1:18:42]
>> their negligence or a mechanical
[1:18:44]
failure.
[1:18:45]
>> Yes.
[1:18:45]
>> Yeah. I remember this discussion though.
[1:18:47]
>> Yeah.
[1:18:48]
So,
[1:18:48]
>> so it's an issue.
[1:18:50]
>> We we we I mean this is this has been
[1:18:53]
exhausted.
[1:18:54]
>> I'm tired of this.
[1:18:55]
>> Well, right. But it it I mean the
[1:18:57]
current code Dan, can you just you want
[1:19:00]
to read it?
[1:19:01]
>> Yeah. This is a village for all grinder
[1:19:03]
pumps installed by the former sanitary
[1:19:05]
district on or before July 1st, 2020
[1:19:07]
shall maintain, repair, and if
[1:19:10]
necessary, replace the grinder pump
[1:19:12]
subject to the following conditions.
[1:19:13]
Property owner shall consent to entry
[1:19:15]
upon property serviced by the grinder
[1:19:17]
pump of employees. Contractors employed
[1:19:20]
by the village for the purpose of
[1:19:22]
maintaining, repairing and or replacing
[1:19:24]
the grinder pump. The property owner
[1:19:27]
annually consents to the inspection of
[1:19:29]
the grinder pump and the property owner
[1:19:32]
complies with all rules, regulations,
[1:19:34]
policies adopted by the village for the
[1:19:36]
operation and use of the gr.
[1:19:38]
>> We're inspecting these every year. So
[1:19:42]
that was a practice we discontinued
[1:19:44]
because the inspections were not the
[1:19:47]
inspections were not worth the juice and
[1:19:49]
squeeze kind of principle. We we were
[1:19:51]
paying for inspections to be done on
[1:19:53]
pumps that hadn't failed or weren't
[1:19:54]
going to fail and we didn't know when
[1:19:55]
they were going to fail. So we forewent
[1:19:57]
>> all inspections and is determined it was
[1:20:00]
just fiscally responsible to wait till
[1:20:02]
it happened.
[1:20:03]
>> For years we paid I think it was $350
[1:20:05]
per grinder pump.
[1:20:08]
Okay.
[1:20:08]
>> So, this is not this is not
[1:20:10]
>> I think this code section does not
[1:20:13]
necessarily reflect what maybe the the
[1:20:16]
board's intention is because the the way
[1:20:19]
it's read if I'm looking at this from a
[1:20:21]
resident is that you're going to
[1:20:22]
maintain, replace, repair my grinder
[1:20:25]
pump because it was installed for 2020
[1:20:28]
uh in perpetuity.
[1:20:30]
>> Well, then do we have to qualify it one
[1:20:32]
time only?
[1:20:33]
>> I would one qualifying event and you're
[1:20:35]
done. This is the existing code or this
[1:20:38]
is the proposed.
[1:20:39]
>> This is the exist.
[1:20:41]
>> We can't be stuck on this for ever.
[1:20:45]
>> We got to put something on.
[1:20:46]
>> Yes.
[1:20:47]
>> How did how did that date come in if
[1:20:48]
nothing was passed in 2024?
[1:20:50]
>> I think I don't know who did that.
[1:20:52]
>> There was there was the date of 2020 was
[1:20:54]
approved
[1:20:55]
>> around that time.
[1:20:57]
>> But we never we never did an exhibit
[1:20:59]
list or so. there is no exhibits
[1:21:02]
referenced in the code
[1:21:03]
>> and that's too much bookkeeping and it
[1:21:04]
>> but I mean even if an exhibit list was
[1:21:06]
placed in the code it's still based on
[1:21:10]
this language makes it seem like it's in
[1:21:12]
perpetuity.
[1:21:13]
Well, then we have to add language that
[1:21:15]
it's one qualifying event or however
[1:21:17]
youally state that.
[1:21:18]
>> We either got to figure out if we're
[1:21:20]
cutting it off now or we're giving
[1:21:21]
everybody one.
[1:21:25]
So, those are the two choices we got.
[1:21:27]
>> And then sunset it eventually too. You
[1:21:29]
leave it open forever. Like
[1:21:31]
>> why can I ask why you would why why
[1:21:33]
would you have the residents pay one
[1:21:37]
more grinder pump repair, one more
[1:21:40]
replacement, one more whatever? Is it a
[1:21:43]
replacement? Is it a repair? Is it this
[1:21:45]
or is it that? You you know, there's a
[1:21:47]
lot of questions.
[1:21:48]
>> I'm just saying those are the two main
[1:21:49]
ideas that make sense to me.
[1:21:50]
>> I know
[1:21:51]
>> that make any sense. There's other ones
[1:21:53]
that I don't think would work.
[1:21:55]
>> I think those are the two viable options
[1:21:56]
we have.
[1:21:57]
>> I personally think this has gone on far
[1:22:00]
enough long enough. I myself
[1:22:04]
would vote for it. We have to cut it
[1:22:06]
off.
[1:22:08]
>> Right. So that's where Linda is. Mark,
[1:22:09]
you're on the committee as well. What would what's your thought?
[1:22:13]
>> Um I I mean I I'm still with where the
[1:22:15]
attorneys at in 2024. Um I don't think
[1:22:19]
it's that far off from our current code,
[1:22:21]
but there they're just the way it's
[1:22:23]
currently written. I think there's uh
[1:22:25]
loopholes that could be exercised and I mean that that's why we forwent
[1:22:30]
these inspections because they were just
[1:22:31]
costing money and
[1:22:34]
um
[1:22:35]
yeah,
[1:22:37]
there's a lot of history. there's a lot
[1:22:39]
of lack of documentation of the history
[1:22:41]
that we had to make up for and that's
[1:22:43]
kind of where the current code was. Um
[1:22:45]
I'm not opposed to
[1:22:48]
um reworking the code, but I'm I am also
[1:22:52]
not I guess I'm not in favor of just
[1:22:55]
completely cutting it off. I think there
[1:22:57]
has to be a criteria to it and and it's
[1:23:00]
got to be a simp simple criteria
[1:23:03]
kind of much in line with what we
[1:23:05]
already currently have. So if we go with
[1:23:06]
that date though, then we would be we
[1:23:09]
would there would be 10 homeowners that
[1:23:11]
would be cut off and never get another
[1:23:13]
one moving forward.
[1:23:14]
>> 10?
[1:23:15]
>> Yes. If there's if there's 32 total and
[1:23:18]
10 have been replaced in the last uh six
[1:23:21]
years, then we would be on we would
[1:23:23]
still say we would replace 22 more that
[1:23:26]
have not been replaced in the last six
[1:23:28]
years. Is that is that what I'm hearing?
[1:23:32]
>> That's how I understood that.
[1:23:33]
>> That's the way that's the way it's
[1:23:34]
written right now.
[1:23:37]
Right, Dan?
[1:23:38]
>> No, that's the way it's written in the
[1:23:40]
>> Well, I mean, yeah,
[1:23:41]
>> there's 12 that have been replaced.
[1:23:45]
>> 12.
[1:23:46]
been replaced since 2020? July 1st,
[1:23:48]
2020.
[1:23:48]
>> Yeah.
[1:23:52]
» So, and how how many how many outlying
[1:23:55]
grinder pumps were installed by the
[1:23:57]
sanitary district on or before July 1st,
[1:23:59]
2020
[1:24:01]
>> that are currently out there?
[1:24:02]
>> Is that 20?
[1:24:03]
>> 20. I gave you that big whole sheet. I
[1:24:05]
gave you all that work
[1:24:06]
>> that have been I thought that was a 12.
[1:24:08]
No, that haven't. Oh, haven't
[1:24:22]
» Oh, there's 20
[1:24:27]
21 or 22. I got to count which ones
[1:24:29]
because this is only updated to the be
[1:24:32]
January this year. I don't remember if
[1:24:33]
we did two or three this year,
[1:24:35]
>> but but anything after 2020, July 1st,
[1:24:37]
2020 doesn't count because they were on
[1:24:39]
their own.
[1:24:40]
So any pump that's six years,
[1:24:42]
>> right? But I'm saying that I've counted
[1:24:44]
23, but I I think we've replaced two of
[1:24:48]
these that still show a date of 14. So I
[1:24:51]
think we're around 2020 that are were
[1:24:54]
installed before July 2020. So the fact
[1:24:59]
that we've done that numbers don't add
[1:25:00]
up to me that sounds like we have
[1:25:02]
replaced one of these grinder pumps
[1:25:04]
twice in the last six years.
[1:25:07]
We the only one I can think of is
[1:25:09]
recently somebody had a grinder pump
[1:25:11]
that was
[1:25:13]
I think there's two and one of them were
[1:25:17]
trying to get money back from uh the
[1:25:19]
energies because it was an issue that
[1:25:21]
they had a boring and then that clogged
[1:25:23]
up. So, that one I'm not going to count.
[1:25:24]
We get the money back from We Energies
[1:25:26]
or Michael did. Uh, but there was one
[1:25:29]
that just recently that was installed a
[1:25:32]
year ago that we just had to
[1:25:36]
>> Can you state for the record to not all
[1:25:38]
of the 32 are in people's homes? Can you
[1:25:41]
state how many are outside of the homes?
[1:25:44]
>> No, I have
[1:25:45]
>> I believe they're I don't know. You mean like that that
[1:25:50]
are in like the road
[1:25:51]
>> that are in the private the private uh
[1:25:54]
>> I believe they're in the home.
[1:25:55]
>> Not not all of them
[1:25:57]
>> because we have some just in like by
[1:25:59]
bramble that we were talking about that
[1:26:01]
there was pumpkin.
[1:26:03]
>> Yes.
[1:26:04]
>> Yeah. I don't know how many
[1:26:06]
>> it's say that in Bramble you just heard
[1:26:08]
what
[1:26:08]
>> so when we discussed Golf Hills Drive
[1:26:12]
remember we had somebody that wanted to
[1:26:13]
hook up. Yeah. There are some
[1:26:16]
individual force manes that have a
[1:26:18]
grinder pump that are outside of the
[1:26:20]
home, but they're still with they're
[1:26:22]
still in their lateral. So, they're
[1:26:23]
still
[1:26:24]
>> on the property of the home.
[1:26:25]
>> The property. Okay.
[1:26:27]
>> Do we have do we have installation dates
[1:26:29]
of all these other pumps?
[1:26:32]
>> We have placed in service dates.
[1:26:35]
>> Not going way back though, do you? Well,
[1:26:37]
wait a minute. Yes. Yes. Yes. Yes. we
[1:26:40]
have we have isolation.
[1:26:45]
» So I I think the board can reach a
[1:26:47]
consensus and we take formal action on
[1:26:49]
it at the next meeting that we either
[1:26:52]
leave it so that the sanitary district
[1:26:54]
or so that the san district is paying
[1:26:57]
for all of them moving forward like they
[1:26:59]
are now effectively that they're paying
[1:27:01]
for none and homeowners are are
[1:27:03]
responsible for everything or we have it
[1:27:07]
as a date. I mean, those are the three
[1:27:09]
options that we that we have.
[1:27:11]
>> Yeah. Let me uh
[1:27:12]
>> the other option. Can we us offer a
[1:27:13]
payout to get them off of it and say
[1:27:15]
we're closing this and give them a
[1:27:16]
thousand bucks? Call it a day.
[1:27:20]
>> That's a lot better than our last
[1:27:21]
>> I think Linda's gonna be on that one.
[1:27:22]
>> Uh I think so.
[1:27:24]
>> Yeah.
[1:27:25]
>> So, here the these were um so back in
[1:27:27]
2024, we did come up with um a few
[1:27:29]
options. Option one, the property owner
[1:27:32]
is responsible for all maintenance and
[1:27:34]
replacement of the grinder pumps and
[1:27:36]
sewer laterals to the property line.
[1:27:39]
This was the proposed new code approved
[1:27:40]
by the committee. Two, the village is
[1:27:44]
responsible for those original sewer
[1:27:46]
grinder pump connections done before
[1:27:48]
2020 for replacement of grinder pumps
[1:27:51]
and property owners are responsible for
[1:27:53]
bianual maintenance and repairs. Option
[1:27:56]
three, the village is responsible for
[1:27:57]
those original sewer connections done
[1:28:00]
before 2020 for maintenance and
[1:28:02]
replacements through 2030.
[1:28:05]
Or four, the village is responsible for
[1:28:07]
maintenance and replacement for those
[1:28:08]
original sewer connections done before
[1:28:10]
2020. This was in the sanitary district
[1:28:13]
code.
[1:28:16]
>> I'm not sure if I understood all of
[1:28:17]
that. Did everybody else or just me?
[1:28:20]
>> No, I I think we went through it pretty
[1:28:22]
quickly. I'm not I I
[1:28:24]
>> We had talked about a sunset date.
[1:28:26]
>> So the the sunset date was 2030.
[1:28:28]
>> Yeah.
[1:28:28]
>> Well, I know you had talked about that
[1:28:30]
and I said that's ridiculous myself.
[1:28:32]
It's too far out. I I said it at the
[1:28:34]
time
[1:28:35]
>> that far now, but
[1:28:36]
>> Well, I know it doesn't sound that far
[1:28:37]
now, but but why? We have paid 37 years.
[1:28:42]
Why?
[1:28:43]
>> I I I
[1:28:45]
one position or the other. I I
[1:28:47]
>> you have a sunset thing that far out
[1:28:49]
people will forget to clog their pumps
[1:28:51]
up on purpose to get a new one.
[1:28:55]
>> I think there's a I mean there is a
[1:28:56]
sensitivity to the cost of these grinder
[1:28:59]
pumps and the fact that somebody that
[1:29:00]
never has had to maintain them before or
[1:29:02]
somebody that owns their house outright
[1:29:04]
that might
[1:29:06]
think that $6,500 is a huge expense that
[1:29:09]
they've never had to pay for.
[1:29:11]
>> Exactly. Like a like a septic system to
[1:29:13]
everybody else here. Right. like a well
[1:29:15]
pump. We all know it costs money. That's the cost of owning a home. They
[1:29:20]
know it when they're ahead of time.
[1:29:22]
>> I mean, we one thing we also are
[1:29:24]
forgetting historically is when we were
[1:29:26]
a sanitary, all district members paid in
[1:29:30]
a fee that
[1:29:32]
>> $48
[1:29:33]
>> that some never even got back.
[1:29:35]
>> Right. But $48. But that has stopped
[1:29:38]
when we became a village.
[1:29:40]
>> Well, bec it stopped when we became a
[1:29:42]
utility. Oh, well,
[1:29:43]
>> there was a tax there's a $48 storm
[1:29:46]
water fee on a tax bill.
[1:29:48]
>> But there's there was there was a tax
[1:29:50]
levy though that that has gone away.
[1:29:51]
>> Yes.
[1:29:52]
>> Sewer levy.
[1:29:52]
>> Sewer.
[1:29:54]
>> Sorry. A sewer levy. There was a tax on
[1:29:56]
that.
[1:29:57]
>> It's illegal. We can't do it because
[1:29:58]
we're a village.
[1:30:01]
>> I I don't you know I I'm not an
[1:30:03]
attorney. I have no idea.
[1:30:05]
>> But that kind of surprised me.
[1:30:08]
>> Because it's our utility now. We make
[1:30:10]
our we make our revenue based on our
[1:30:12]
needs. All
[1:30:13]
>> right. So, where do we where do we want
[1:30:15]
to go? I mean, what what's I mean, we
[1:30:17]
Linda's made her position clear. Is
[1:30:20]
everyone we haven't I mean, we're not
[1:30:22]
taking formal action, but we can kind of
[1:30:24]
reach a consensus and take formal action
[1:30:26]
later. So, are we are we there or do we
[1:30:28]
want to do something more in line with
[1:30:30]
what was written up before or
[1:30:34]
nothing? I mean, that's I don't know who
[1:30:36]
wants to start.
[1:30:37]
>> I think we should do something. I don't
[1:30:39]
think we should kick the can down the
[1:30:40]
road anymore. Whatever it is, something
[1:30:42]
should got to get done.
[1:30:42]
>> What do you think that something should
[1:30:43]
be?
[1:30:45]
>> I was in the bathroom as most of the
[1:30:46]
discussion.
[1:30:48]
I mean, I
[1:30:52]
I'm not exactly sure. I mean, I I think
[1:30:55]
the date, the 2020 date makes sense
[1:30:58]
because again, I don't know how you
[1:31:01]
spring it on people and just like all of
[1:31:02]
a sudden cut them off from it. I think
[1:31:04]
you'd have a lot of really angry people
[1:31:09]
So, I guess that's where I would I would
[1:31:10]
fall on it.
[1:31:11]
>> But are we cutting off the 2020 date too
[1:31:13]
for them? Is that We're still cutting
[1:31:15]
off a date.
[1:31:16]
>> Yeah. Well, I mean, then maybe change
[1:31:18]
the date. I don't make it so yet there's
[1:31:20]
very few left in there. I don't know.
[1:31:21]
>> I don't know.
[1:31:22]
>> Well, it sounds like the code has to be
[1:31:24]
amended no matter what. Either to
[1:31:28]
>> fix the issue of the in perpetuity. So
[1:31:31]
why don't we, you know, staff can
[1:31:33]
present some options based on the
[1:31:35]
discussions that we've had here and then
[1:31:37]
kind of present that to the board. Well,
[1:31:39]
I think we can kind of reach a Rob,
[1:31:41]
where are you at?
[1:31:42]
>> Is there a way that you can just do the
[1:31:44]
if nobody ever if they never got
[1:31:46]
replaced, they get one was talking about
[1:31:48]
>> No, Mark said that we can't because we
[1:31:49]
don't have good records. We don't know
[1:31:51]
that. That's what the attorney said.
[1:31:52]
That's so it's got to be there's got to
[1:31:53]
be a date. So you you did have that's my
[1:31:57]
that's what I heard
[1:31:59]
some people if they needed the original
[1:32:02]
some of them not not
[1:32:04]
do that we don't have
[1:32:05]
>> all installed they sent all them that
[1:32:07]
was it
[1:32:08]
>> so you see but you so you did have in
[1:32:10]
your head that
[1:32:11]
>> we would do it for some people if they
[1:32:13]
the original people the only ones are
[1:32:15]
the ones I haven't updated yet from this
[1:32:17]
year
[1:32:17]
>> I'm thinking that way would be fair and
[1:32:19]
easiest to
[1:32:20]
>> all right we shouldn't be talking over
[1:32:21]
each other but is that is that news to
[1:32:23]
you Mark that we do have dates on all
[1:32:24]
32?
[1:32:25]
>> No, we we have dates of install, but we
[1:32:28]
don't know if they're original dates of
[1:32:29]
install. Like I think what Linda is
[1:32:32]
saying is if they've never had one,
[1:32:34]
correct me if I'm wrong, if they've
[1:32:35]
never had one and the original owner,
[1:32:37]
they get one.
[1:32:37]
>> Yeah.
[1:32:38]
>> But if we have dates of install for all
[1:32:40]
32 and and then and then some of those
[1:32:41]
dates were
[1:32:42]
>> But now, but yeah, the
[1:32:43]
>> original,
[1:32:44]
>> but we don't have property record. We'd
[1:32:47]
have to go through every property record
[1:32:48]
and determine if they are.
[1:32:49]
>> We don't have records like that. Only
[1:32:50]
thing we have is the the chart I gave
[1:32:52]
Dan.
[1:32:53]
>> You're talking about original
[1:32:55]
to the home.
[1:32:56]
>> That's what she's that that was what
[1:32:58]
>> I mean they're all all the dates are
[1:33:01]
2012 or later.
[1:33:02]
>> The grinder pumps don't last that long.
[1:33:04]
So they
[1:33:05]
>> So there's no So they've all been So
[1:33:07]
that's that point's irrelevant then.
[1:33:09]
>> Yeah.
[1:33:09]
>> So then every single one of them have
[1:33:11]
been replaced at least once.
[1:33:12]
>> You were making it sound like Linda that
[1:33:13]
there's been there's some 37y old pumps
[1:33:15]
here.
[1:33:15]
>> Well, that's what we had talked about
[1:33:17]
originally. There was only a couple
[1:33:19]
original that has never been done.
[1:33:21]
That's what I was told.
[1:33:23]
>> We The originality was the homeowner,
[1:33:25]
not the pump.
[1:33:26]
>> Oh,
[1:33:27]
>> which is a difference. The They could
[1:33:28]
have had six or seven pumps, but as long
[1:33:29]
as they were original owners,
[1:33:31]
>> they were
[1:33:32]
>> unless we have a brand like brand new
[1:33:34]
homes that were built 2012 or later, the
[1:33:36]
sewer district in that area, but I don't
[1:33:37]
think there are any new.
[1:33:38]
>> I don't think there are any.
[1:33:40]
>> They have to worry about that part.
[1:33:41]
Yeah.
[1:33:41]
>> All right. So, I'm I'm fine with either
[1:33:43]
one of these options. I mean, where Mark, where are you? you are as
[1:33:47]
well or do you have a preference between
[1:33:48]
Linda's or
[1:33:50]
>> now that everybody's has been replaced
[1:33:51]
six to 12 times I'd say we just cut it
[1:33:53]
off
[1:33:57]
» just vote as if you were you were only
[1:34:00]
thing I ask is vote what's if you were
[1:34:04]
in the and paying these fees and you
[1:34:06]
were paying for it so look at it that
[1:34:09]
instead of just on paper oh I don't know
[1:34:11]
I'll just vote this way look at it as if
[1:34:13]
you were paying those fees and how
[1:34:15]
unfair it cut her off right now.
[1:34:18]
>> That's all I ask. That's all I ask.
[1:34:20]
>> But Linda, I I have also heard about the designing of the system and that the
[1:34:25]
system was designed
[1:34:26]
>> awful was designed awfully, but it was
[1:34:29]
designed cheaper. It could have been
[1:34:31]
designed more expensive for everybody
[1:34:33]
and there wouldn't have been grinder
[1:34:34]
pumps.
[1:34:35]
>> Yeah. So, but because some of these
[1:34:38]
houses because it was designed cheaper,
[1:34:40]
these houses had the grinder pumps that
[1:34:42]
saved everyone money originally and and
[1:34:44]
now there are grinder pumps and some
[1:34:46]
that that are fall on the burden of
[1:34:48]
these uh 32 properties whereas the
[1:34:52]
remaining 420 benefit from the from the
[1:34:57]
cheaper system original construction
[1:34:59]
costs. I've heard that as well. So
[1:35:02]
>> that's and maybe we'll hear that again
[1:35:04]
when we when we
[1:35:06]
>> Well, they didn't go as deep as maybe
[1:35:07]
they should have,
[1:35:09]
>> right? Because if we would have gone
[1:35:10]
deeper, then we wouldn't have needed
[1:35:11]
these grinder pumps, right?
[1:35:12]
>> Yeah.
[1:35:12]
>> So that's
[1:35:13]
>> Yeah.
[1:35:13]
>> I mean,
[1:35:14]
>> if they've been paying the sewer fees
[1:35:15]
all these years, hasn't that cost equal
[1:35:17]
itself out by now?
[1:35:18]
>> Yeah.
[1:35:21]
>> The cost, but the co I mean, everyone
[1:35:23]
saved on this system because it was more
[1:35:25]
cheaply designed. I think if you were
[1:35:28]
going to fix the problem, you would re
[1:35:30]
redo the whole entire system
[1:35:32]
>> and then Well, I'm serious. And so
[1:35:35]
that's
[1:35:36]
>> I'm moving.
[1:35:37]
>> There's option three.
[1:35:38]
>> I'm moving.
[1:35:40]
>> Seriously, I'm moving.
[1:35:42]
>> Mark, where are you at?
[1:35:43]
>> Um I there is going to be a handful of
[1:35:48]
people, as Linda stated, that are going
[1:35:50]
to bring in this 1992
[1:35:53]
um agreement. And it does read, "The
[1:35:56]
sanitary district shall assume
[1:35:58]
responsibility for maintenance of the
[1:35:59]
grinder pumps provided the sanitary
[1:36:00]
sewer lateral and grinder pump has been
[1:36:02]
installed in accordance with the
[1:36:04]
maintenance policy."
[1:36:05]
>> Isn't that null and void since we don't
[1:36:06]
have a sanitary district anymore?
[1:36:09]
>> Well, we assume their policy,
[1:36:11]
>> right? Thank you, Rob.
[1:36:12]
>> I don't know. That's
[1:36:13]
>> we have
[1:36:14]
>> I don't know. I I don't know
[1:36:16]
>> district anymore. Never thought of that.
[1:36:19]
>> I don't know if that's how that works or
[1:36:21]
not. Just
[1:36:21]
>> But that doesn't mean that it can't
[1:36:23]
change. How many times Does a
[1:36:25]
municipality change things because it
[1:36:27]
doesn't, you know, it's just too
[1:36:29]
expensive. It doesn't work.
[1:36:30]
>> I mean, I would I would definitely
[1:36:32]
>> Did they sign a contract, Mark?
[1:36:34]
>> I Yeah, good luck. This was all we could
[1:36:36]
find back then. They they brought in a
[1:36:39]
um document that was unverified,
[1:36:41]
>> right?
[1:36:41]
>> We don't know based off records if it
[1:36:43]
was ever approved. And
[1:36:45]
>> Yep.
[1:36:45]
>> So, we're gambling then. No, I don't
[1:36:48]
think I guess if you make a date certain
[1:36:52]
in the future and you don't put any
[1:36:55]
situations attached to it like whether
[1:36:57]
it was an original homeowner, if they've
[1:36:58]
had it replaced, if it's been prior to
[1:37:00]
or after 2020, I think you can get by
[1:37:03]
with it and then you just have to put in
[1:37:05]
there a negligence clause
[1:37:06]
>> in the future though. You're saying not
[1:37:07]
in the future. Not you don't like this
[1:37:09]
July 1st, 2020 date. Do you want it to
[1:37:11]
be in the future? I would say keep the
[1:37:13]
July 1st, 2020 date and also sunset it.
[1:37:18]
>> Okay.
[1:37:18]
>> But do it for like next week. Don't put
[1:37:21]
it way out. Do it soon.
[1:37:24]
>> Well, that's okay. Oh, I mean
[1:37:26]
>> No, I mean I I I think you have there
[1:37:29]
are people that do remember this
[1:37:30]
agreement. There's people that bought
[1:37:32]
their homes under this premise.
[1:37:35]
>> There is you're there's gonna be a lot
[1:37:37]
of people in here talking about this.
[1:37:39]
And
[1:37:40]
>> I I I do think it's responsible to at
[1:37:42]
least I mean they were given notice.
[1:37:45]
>> Um but if if we're going to completely
[1:37:47]
cut it off, I think we we give them a
[1:37:49]
date.
[1:37:50]
>> So let's do let's let's do that. Let's I
[1:37:51]
mean I I I would be based on what I'm
[1:37:53]
hearing everyone else and a compromise
[1:37:55]
to me makes sense is sticking with the
[1:37:58]
July 1st, 2020 date. So that's 20 to
[1:38:00]
22ish that we'd still be on the hook
[1:38:02]
for. But if they don't get them replaced
[1:38:04]
by the 2030 date that was in the
[1:38:07]
previous proposal, then we're not paying
[1:38:09]
them for them after that. So if they if
[1:38:11]
they make it that long, then we're
[1:38:13]
>> it can't be just a major
[1:38:15]
>> saying 2030 in four years.
[1:38:18]
>> 2030,
[1:38:18]
>> which is what the proposal was from the board or the attorney when you
[1:38:23]
looked at this a couple years ago.
[1:38:24]
>> We could potentially be replacing them
[1:38:27]
one a year until for four years
[1:38:29]
>> is what we're saying. Or you can be
[1:38:30]
placing, you know, six, you know, five
[1:38:32]
or six a year for the next four years.
[1:38:34]
>> Or you make it or you make it a shorter
[1:38:36]
date. I mean, that's up to the board.
[1:38:40]
>> I mean, you're
[1:38:41]
>> That was Dan's idea.
[1:38:42]
>> Well, no, but it came from It came from
[1:38:44]
the attorney or something else.
[1:38:46]
>> It came from It came from the attorney
[1:38:48]
or Kathy or the senary district.
[1:38:51]
>> It's been brought up before. It's not
[1:38:53]
something that came pulled out of thin
[1:38:55]
air.
[1:38:56]
30 is way out
[1:38:57]
>> back in 2018 and 2019 about this and we
[1:39:00]
talked about a subset law. So
[1:39:04]
>> and then can can we put a stipulation in
[1:39:06]
like one in that if we do 2030 you're
[1:39:08]
entitled to one
[1:39:10]
>> I think because the install date would
[1:39:12]
be after the cutoff.
[1:39:13]
>> It's not how it's written but you should
[1:39:14]
clean it up so it is written.
[1:39:16]
>> Well I would I would
[1:39:17]
>> Okay. So I think you've got you've got a
[1:39:19]
consensus for you understand where we're
[1:39:20]
at and where the majority of the board's
[1:39:22]
at. kind of a compromise that gets that
[1:39:24]
gets almost all the way that you're
[1:39:25]
there. It's not gonna it's going to make
[1:39:27]
people here um be have a little of a
[1:39:32]
compromise. You're still welcome to make
[1:39:34]
the um motion at the next meeting,
[1:39:37]
Linda, to to
[1:39:38]
>> Oh, I see. I got very far with that one.
[1:39:41]
I'm not going to get very far with that
[1:39:43]
one. I think part of the problem is, as
[1:39:46]
Mark's pointing out, if we try to cut it
[1:39:49]
directly off, we're opening ourselves up
[1:39:51]
to litigation.
[1:39:52]
>> I I I just ask, if we don't extend it
[1:39:55]
out to 2030,
[1:39:56]
>> what what what date makes sense to you?
[1:40:02]
» 28
[1:40:03]
compromise
[1:40:04]
>> the end of or beginning of January 1st
[1:40:06]
or January 31st?
[1:40:07]
>> 28.
[1:40:08]
>> So we got So next year is our last year.
[1:40:10]
>> That's it.
[1:40:11]
>> So write write the proposal up. how we
[1:40:14]
said with with those previous dates
[1:40:15]
right January 1st to 28 if the board
[1:40:17]
wants to amend it to a different date to 29 30 whatever at the next meeting we
[1:40:23]
can certainly do that but it's something
[1:40:24]
on paper for us to to discuss
[1:40:26]
>> so if just a point of clarification if
[1:40:29]
they've had one replaced post July 1st
[1:40:32]
2020
[1:40:33]
>> if they had it post
[1:40:36]
are they done done
[1:40:36]
>> they're done done
[1:40:38]
>> they're done
[1:40:40]
do
[1:40:43]
Natasha, does she know all of this
[1:40:46]
>> or do you know all
[1:40:47]
>> what
[1:40:47]
>> the date? Have we replaced
[1:40:49]
>> had all the dates?
[1:40:50]
>> Have we replaced any of those?
[1:40:53]
>> Okay,
[1:40:54]
>> we replaced about you know 11 people.
[1:40:57]
>> 12 to 13.
[1:40:59]
>> We're going to be on the hook for 20 to
[1:41:01]
22 of them. Possibly 132,000 to 150,000
[1:41:04]
depending how much they are and how far
[1:41:06]
we go.
[1:41:07]
>> And we'll be paying $350 on on a
[1:41:09]
threemonth fee. now
[1:41:11]
>> for for our user fees to pay all these
[1:41:15]
costs with everything else that we have
[1:41:17]
to pay. No, I'm just saying our our we
[1:41:20]
you know our we're going to be paying
[1:41:22]
more money. That's all on on for our
[1:41:24]
monthly our three-month fee that we pay
[1:41:27]
for for our user fees. We pay user fees
[1:41:29]
every three months.
[1:41:31]
>> Why makes that go up?
[1:41:33]
>> That goes up every time our cost go up.
[1:41:35]
It's $180 now.
[1:41:37]
>> That That's the sewer fee.
[1:41:38]
>> That's the sewer fee. We pay every three
[1:41:40]
months.
[1:41:41]
>> That's not for grinder pumps. That's not entirely for grinders.
[1:41:44]
>> Everybody Everybody pays $180 for their
[1:41:47]
sewer every three months.
[1:41:48]
>> And you're saying that's the money
[1:41:49]
that's used to pay for the grinder pump.
[1:41:51]
>> That No, that's Well, that's everybody's
[1:41:53]
money. It's everybody's money that we
[1:41:55]
have got the million and two actually
[1:41:57]
that and we'll go over that the next
[1:41:59]
one. If you want to go if it's getting
[1:42:00]
too late, we'll wait till next meeting.
[1:42:02]
But I'm just saying that whatever money
[1:42:05]
we have on hand in the sewer fund pays
[1:42:07]
for the grinder pumps. the $180 is the
[1:42:10]
fee that we have to pay into Sussex and
[1:42:12]
so forth and pay for our regular
[1:42:15]
expenses we have to pay.
[1:42:17]
>> Okay.
[1:42:18]
>> And once they they go up, we had to
[1:42:20]
raise it this last year and it's going
[1:42:21]
to be raised again this year. There's no
[1:42:23]
doubt about it. It will be raised.
[1:42:25]
>> So, well, with what we're doing right
[1:42:27]
now, does that have any effect on the
[1:42:28]
fees?
[1:42:29]
>> Well, you better believe it. What?
[1:42:30]
>> Well, no, but but if if we did nothing,
[1:42:32]
the fees would be higher, right? Right?
[1:42:34]
If we did nothing, the fees would be
[1:42:35]
higher because we But if we take this
[1:42:38]
action at the next meeting, we are
[1:42:39]
reducing future costs.
[1:42:41]
>> So we're so we're going to have less
[1:42:42]
you're going to have less
[1:42:43]
>> in the future if if you do it and say,
[1:42:45]
"Hey, we're not going to pay for these
[1:42:46]
grinder pumps anymore." Yes.
[1:42:48]
>> Right. So So this is this is if we take
[1:42:49]
this action, it is a net positive to
[1:42:52]
Yes. It's a net positive.
[1:42:53]
>> And we're only we're only replacing them
[1:42:55]
if they're legitimately broken. We're
[1:42:57]
not replacing them.
[1:42:58]
>> Well, it's if a kid stuffs a bunch of
[1:43:00]
toys down there, a homeowner says they
[1:43:02]
want a new one. So there is a there is a variable that reduces the cost to that
[1:43:07]
in the sense that we're not we we used
[1:43:10]
to just direct replace everything. We
[1:43:11]
we've undertaken a policy where when we
[1:43:14]
pull the unit we may install a
[1:43:16]
refurbished unit
[1:43:18]
>> which so we're not entirely replacing
[1:43:20]
the $6,000 pump anymore. We might be
[1:43:22]
replacing it with a pump on hand.
[1:43:24]
>> Yeah, that's fine.
[1:43:24]
>> Does the code have to stipulate that? So
[1:43:26]
the homeowner would be like it's not a
[1:43:28]
new one. I'm just saying
[1:43:30]
>> it doesn't say it doesn't say
[1:43:31]
>> choice.
[1:43:32]
>> It just says replace. Okay.
[1:43:35]
>> But we're not necessarily going to be on
[1:43:36]
the hook for all 22 of these by 28
[1:43:39]
because they have to be actually broken.
[1:43:41]
>> You guys said however many are prepared
[1:43:44]
replaced.
[1:43:44]
>> But they actually have to legitimately
[1:43:46]
break.
[1:43:47]
>> 22 legitimately. If
[1:43:48]
>> 12 of them have broke in the last six
[1:43:50]
years, you would think that we're not
[1:43:51]
going to have 22 break in the next
[1:43:54]
>> Our estimate is we replace two to three
[1:43:55]
every year. Yeah.
[1:43:58]
>> And we have two available to replace.
[1:44:01]
>> So if we set this
[1:44:03]
>> ability to determine whether or not it's
[1:44:04]
negligence based on the now that we get
[1:44:07]
them repaired.
[1:44:07]
>> If we got a Lego set in there that's
[1:44:09]
going to be negligence.
[1:44:10]
>> That is done much better now than it was
[1:44:13]
done in the beginning. Let me tell you
[1:44:15]
much better. We paid for things that
[1:44:17]
shouldn't have been just take the pumps
[1:44:19]
and scrap them down.
[1:44:20]
>> Deb used to just take them out and put a
[1:44:22]
new one in.
[1:44:24]
Are we ready to move on to sew to item
[1:44:26]
E?
[1:44:27]
>> So I feel better about that here.
[1:44:30]
>> Clarify staff will present options for
[1:44:33]
adoption on this Dan.
[1:44:36]
>> Yeah, I will draft the code and run it
[1:44:38]
to the attorney. Do you want options or
[1:44:40]
do you want the option of what we
[1:44:42]
discussed with a 20 January 1st 20
[1:44:45]
sunset and um making sure the January
[1:44:49]
for the the June 2020 date is not in
[1:44:54]
>> July July I think by July 1st of Yes.
[1:44:57]
Right.
[1:44:58]
>> Yeah. That would be the cut off and then
[1:44:59]
negligence isn't covered.
[1:45:02]
>> Is there any So that I think that's what
[1:45:03]
we want. But is there is there anything
[1:45:04]
else you want the attorney or Dan to
[1:45:06]
research as an alternative to possibly
[1:45:08]
discuss?
[1:45:09]
>> Can you present uh attorney Larson with
[1:45:11]
attorney Macy's findings from
[1:45:14]
>> Yeah. Can you forward me that
[1:45:17]
I mean the given?
[1:45:25]
» This is truly how the sausage gets fed.
[1:45:26]
Huh?
[1:45:31]
» So to speak. I'm sorry to keep you so
[1:45:33]
long. I'm sorry.
[1:45:34]
>> I think it's
[1:45:35]
>> I've been stressing over this for so
[1:45:37]
long.
[1:45:37]
>> Well, we're going to do something about
[1:45:39]
it
[1:45:39]
>> and Mark knows it.
[1:45:42]
>> All right. So, yeah,
[1:45:44]
>> so item E is discussion uh regarding the
[1:45:47]
village responsibility for various sewer
[1:45:49]
utility costs.
[1:45:50]
>> I think we should wait for Rob to come
[1:45:52]
back. You want me to wait for Rob or I
[1:45:53]
can start talking? Um,
[1:45:56]
>> I it has just been discovered by me that
[1:45:59]
I had no idea that the the um sewer fund
[1:46:05]
is paying for the fire station costs for
[1:46:07]
their sewer repairs everything and that
[1:46:11]
is totally unfair why the sewer fund is
[1:46:15]
paying for the fire station. Those
[1:46:17]
should come out of either the villages
[1:46:19]
money or the fire station fund, not the
[1:46:24]
you know and I request this has been
[1:46:27]
going this has been going on as far as
[1:46:28]
we know since we became a village
[1:46:32]
and whoever did that is we have no idea
[1:46:34]
who it is that said hey the sewer
[1:46:36]
district is going to be paying for the
[1:46:37]
fire station. You know,
[1:46:40]
>> it was 65 35, but the 35 was the the
[1:46:45]
town and now it's the San District.
[1:46:47]
>> Yeah, it's or not district, but that's
[1:46:49]
the the
[1:46:50]
>> it's a sewer fund. Say the sewer fund.
[1:46:52]
So, we know the sewer fund is paying
[1:46:53]
that and that's really not appropriate.
[1:46:57]
I think we should be reimbursed for
[1:46:59]
every cost we paid to reimburse the
[1:47:01]
sewer fund. It's not fair. We have paid
[1:47:03]
that. So, I looked into this and I think
[1:47:07]
it started because the 2025 budget had
[1:47:09]
no sewer costs associated with the fire
[1:47:13]
station, probably because it was made
[1:47:16]
for the contract. Um, so I think it
[1:47:18]
started back in October of 2020.
[1:47:22]
Um, so I did just some research on how
[1:47:25]
much money is paid this year because
[1:47:27]
it's really hard to recover costs from
[1:47:29]
last year given that the books have been
[1:47:30]
closed and the audit's been completed.
[1:47:33]
Um, so the cost of the Richmond split
[1:47:37]
with the 35 uh65
[1:47:40]
uh has been 1,339.35.
[1:47:44]
And then the Richmond
[1:47:46]
fire station flows, which is a monthly
[1:47:49]
charge uh in our commercial bill. I
[1:47:51]
looked back at every one from January to
[1:47:53]
this month and it's $33.70.
[1:47:56]
So, a total you're looking at paying out
[1:47:58]
of the villages share would be $1,6435.
[1:48:04]
I've already put in a budget item for
[1:48:06]
next year. Um, if we want to continue if
[1:48:10]
we want to have the village pay for the
[1:48:11]
fire station costs associated with their
[1:48:14]
usage and with their share of the force
[1:48:17]
man uh at a $3,000
[1:48:21]
budget line item. How about for the new
[1:48:24]
pumps that we just had taken out and put
[1:48:25]
it out? That's more than $1,000. So, I'm
[1:48:28]
a little confused, Dan.
[1:48:29]
>> Because I did the because every I went
[1:48:31]
through the budget code of what we take
[1:48:32]
those pumps out of and it's because of
[1:48:34]
the 3565.
[1:48:36]
>> I know that. Yeah,
[1:48:36]
>> that's what I got when I add it up in
[1:48:39]
our accounting software. So, there that
[1:48:42]
might be a little higher. Maybe one of
[1:48:44]
those uh
[1:48:45]
>> there's been a lot of pumps taken out
[1:48:46]
over the last couple years and that they
[1:48:49]
had to take them out. They had to take
[1:48:50]
them out and take them up north, you
[1:48:51]
know, to the
[1:48:52]
>> Those are grinder pumps.
[1:48:53]
>> Yeah. Yeah. But they had to take
[1:48:55]
something out.
[1:48:56]
>> It was Grab Amazon. We did We did one
[1:48:58]
this year and I That wasn't Yes.
[1:49:00]
included cost. We didn't have to pay for
[1:49:02]
the full pump. We had to
[1:49:03]
>> pay. I I I if I was a vetting woman, I
[1:49:06]
would say that was more than that. I'll
[1:49:08]
double check the costs and and check,
[1:49:10]
but remember that
[1:49:11]
>> you know divide 30 that number by 35%
[1:49:14]
you're looking at somewhere around five
[1:49:15]
grand or total costs
[1:49:17]
>> related to
[1:49:18]
>> I just don't think the sewer sewer fund
[1:49:20]
should pay for it at all. There's no
[1:49:22]
reason for for it to be paid for. Was a
[1:49:25]
formal policy made by the board in 2024
[1:49:30]
to to make this change or did it was it
[1:49:32]
a staff? I think it was I think it was
[1:49:35]
probably a bookkeep
[1:49:37]
that happened
[1:49:38]
>> and I didn't know this until I talked to
[1:49:40]
I'm you know until I questioned
[1:49:42]
something and that's when he said well
[1:49:44]
you know that you know the sewer fund
[1:49:45]
paid I said what the sewer fund pays for
[1:49:48]
this
[1:49:49]
>> so where we're where if we wanted to
[1:49:53]
address this one way or the other we
[1:49:56]
could have it at the next meeting agenda
[1:49:58]
or does it need to be I mean or
[1:50:00]
>> I can just come up with like a budget
[1:50:02]
amendment
[1:50:04]
And then if we had a simple policy that
[1:50:06]
would say that all fire station expenses
[1:50:08]
regarding force main and flows would be
[1:50:11]
paid out of the fire department
[1:50:14]
>> or so in the fact that we approved this
[1:50:17]
board and the previous boards have
[1:50:18]
approved the fire department budget that
[1:50:20]
didn't include the sewer costs I guess
[1:50:23]
indirectly or directly that that it was
[1:50:26]
considered but
[1:50:29]
>> so so
[1:50:30]
>> so we could just do a budget budget
[1:50:32]
amendment and put in their costs this
[1:50:35]
year at the next meeting. So, you do a
[1:50:38]
budget amendment to add, you know,
[1:50:40]
$3,000 the expenditure costs in the
[1:50:43]
sewer fund for the fire department. And
[1:50:45]
there is a budget item for it. It just
[1:50:47]
wasn't budgeted for in 2025. And then
[1:50:50]
when I did the budget 26, so it was
[1:50:52]
nothing that I didn't think to add it.
[1:50:56]
So,
[1:50:57]
>> why can't we go back? Why can't we go
[1:51:00]
back a year before? I just because
[1:51:02]
everything's closed, but why can't we go
[1:51:03]
back and look at the figures?
[1:51:06]
>> I mean, the budget the audit is
[1:51:08]
completed. So, I mean, you're going back
[1:51:10]
and taking money from one area that's
[1:51:12]
been been audited. I mean, the board can
[1:51:14]
consider it if they want to. I I can
[1:51:17]
hold those numbers.
[1:51:18]
>> I mean, my preference would be just to
[1:51:19]
deal with this in 2027
[1:51:22]
moving forward. I mean, I think if we if
[1:51:25]
we go back and do it for 26, that's one
[1:51:27]
thing. I don't want to go back any I
[1:51:28]
mean
[1:51:30]
I'm sympathetic to what you're saying
[1:51:32]
but I I I I don't think that that
[1:51:35]
>> we're talking about $5,000.
[1:51:36]
>> Yeah.
[1:51:37]
>> Or we're talking about 35% of 5,000.
[1:51:40]
>> No.
[1:51:41]
>> Wow.
[1:51:41]
>> So 35% is 5,000 $1,643.
[1:51:45]
I don't know what the total of last
[1:51:46]
year.
[1:51:48]
>> Gosh.
[1:51:49]
>> Are you talking about the the village
[1:51:50]
paying the
[1:51:51]
>> the village should be paying it? the the the um um
[1:51:56]
>> are you talking about the village paying
[1:51:58]
the sewer fund back for the
[1:52:00]
>> Yes, we should.
[1:52:03]
>> So, for 26. So, well, we'll we'll I
[1:52:05]
think we're all Are we all in agreement
[1:52:06]
that we will change the way we're
[1:52:08]
budgeting in for 27 moving moving
[1:52:10]
forward? Definitely.
[1:52:11]
>> Okay. So, we're all on the same page
[1:52:12]
there. When you develop the budget,
[1:52:14]
you're going to you're going to have
[1:52:15]
Okay, good. So, the question is, do we
[1:52:17]
want to make a change for 26? That's really the only question that or or 20, you know, and we want to go
[1:52:23]
back for 25. I I'd say leave 25 alone.
[1:52:26]
Okay. Do we want to what do we want to
[1:52:28]
do for 26? Where where are you at, Mark,
[1:52:30]
on that?
[1:52:31]
>> I mean, we we the books are open, so why
[1:52:33]
not just correct it?
[1:52:35]
>> We can just correct it.
[1:52:39]
You don't need to do a budget
[1:52:43]
how clean the books otherwise
[1:52:46]
>> because if if we did three $3,000
[1:52:49]
allocation for expenses in the fire
[1:52:51]
department then we're also would have to
[1:52:53]
take a $3,000 additional transfer from
[1:52:56]
the
[1:52:57]
>> general fund.
[1:52:59]
>> Right.
[1:52:59]
>> Yeah. I mean we don't have to. I'm just
[1:53:00]
saying if you want it really clean you
[1:53:02]
can do it that way. Otherwise there's
[1:53:03]
zero money budget for it. So, just know
[1:53:05]
that you're going to be over budgeted by
[1:53:06]
three grand in sewers.
[1:53:08]
>> How are the auditors going to want to
[1:53:10]
see it?
[1:53:10]
>> They'll be fine anywhere.
[1:53:14]
>> What's easier for staff?
[1:53:15]
>> Just let me make the change.
[1:53:18]
I'll just update you that it's been done
[1:53:20]
the night before meeting. I I I don't
[1:53:22]
want to go through the hassle of or just
[1:53:24]
it just doesn't seem as clean to do the
[1:53:26]
budget amendment. So I think if if if we
[1:53:28]
have this discussion here and we have a
[1:53:30]
consensus that that that's what we're
[1:53:33]
going to do is is have the village pay
[1:53:36]
for it in 26.
[1:53:38]
>> I don't think
[1:53:39]
>> this year. This year.
[1:53:40]
>> Okay.
[1:53:41]
>> That we don't think we need any formal
[1:53:42]
action since formal action wasn't taken
[1:53:44]
otherwise.
[1:53:45]
>> Yeah. I mean I can I'll just send an you
[1:53:47]
know a general email to the board and
[1:53:48]
blind copy everyone. If I do I'll go
[1:53:50]
back and look at the budget code to make
[1:53:52]
sure that number is right. If it's
[1:53:54]
incorrect for whatever reason and it's
[1:53:56]
higher than that, I'll just let you the
[1:53:57]
board know. But
[1:53:57]
>> because there's been a lot of costs, you
[1:53:59]
know, in my mind, maybe I'm wrong.
[1:54:01]
>> Some of those are directly build at
[1:54:02]
Richmond too at not 35. I know.
[1:54:06]
>> I have a feeling that if we build every
[1:54:08]
cost to the sewer fund, it would be way
[1:54:11]
more than what we do.
[1:54:14]
>> If we had to if we actually accounted
[1:54:16]
for every single minute of staff time
[1:54:18]
devoted Oh, yeah. to
[1:54:20]
>> Yeah, I know. So,
[1:54:21]
>> I know. I I no I think what fun is
[1:54:24]
>> you know the 26 is fine you don't go
[1:54:26]
back that's im you know
[1:54:30]
>> long as we correct it now
[1:54:33]
I appreciate it
[1:54:35]
>> all right so you have this agendaized as
[1:54:38]
various sewer utility costs are is that
[1:54:40]
>> Nope that's not okay then the next
[1:54:42]
paragraph I don't know if you all are
[1:54:44]
aware the sewer district came over here
[1:54:46]
with a200,000
[1:54:49]
so far we paid off about $800 $100,000
[1:54:52]
for the upgrade for the Sussex plant.
[1:54:54]
And this is the first time in 30 years
[1:54:56]
we've ever had to do that. There's
[1:54:58]
another $24,000 that's due. Um this is
[1:55:02]
actually going to bankrupt us, the sewer
[1:55:04]
fund, because if we that money was set
[1:55:06]
aside per the state, we have to keep so
[1:55:08]
much money on hand for repairs. We have
[1:55:10]
to do that. If we break up a road and
[1:55:12]
have to go into the road, we're looking
[1:55:14]
a couple hundred thousand dollar just by
[1:55:16]
breaking up the road, having somebody
[1:55:18]
there doing whatever they need to do and
[1:55:20]
checking the problem. We're going to
[1:55:22]
have to start borrowing money because we
[1:55:25]
paid off this this this um this upgrade
[1:55:29]
thing that's going to benefit everybody
[1:55:31]
that's coming on because here we're
[1:55:33]
talking about K. We're talking about
[1:55:34]
this is going to benefit the the people.
[1:55:37]
And I also talked to Dan about this and
[1:55:39]
he said, "Well, we don't do it now, but
[1:55:42]
we'll do it when it happens and then
[1:55:43]
we'll reimburse the the the the fund."
[1:55:46]
But at that time, why would you
[1:55:48]
reimburse?
[1:55:50]
I think it should be done. We should
[1:55:52]
have help now what benefits the people
[1:55:54]
online so we're not have to borrow money
[1:55:56]
to do some repairs that's going to be
[1:55:58]
necessary down the road being an older
[1:56:00]
system. I'm shocked that we don't have
[1:56:02]
issues because of how bad the system was
[1:56:04]
installed originally
[1:56:06]
and and I just think something needs to
[1:56:08]
be done. I know when this started the
[1:56:10]
town of Lisbon took over the loan. They
[1:56:13]
took out the loan for everything to buy
[1:56:16]
into the plant to buy and we had to pay
[1:56:19]
him back. It took us everyone could go
[1:56:21]
on a payment plan for 10 years and
[1:56:23]
that's what we did. So every nobody had
[1:56:25]
that kind of money to do it. And so I'm
[1:56:27]
just asking why does a a sewer fund have
[1:56:30]
to pay it all? You know, why can't why
[1:56:34]
can't the village step forward say,
[1:56:36]
"Hey, okay, we we are going to be
[1:56:39]
expanding our district and this is going
[1:56:41]
to be a fun and and I just I want some
[1:56:44]
fair play. Why do the 452 pe uh
[1:56:47]
homeowners have to be paying this
[1:56:49]
$824,000
[1:56:52]
alone?"
[1:56:54]
>> You're asking me?
[1:56:54]
>> Yeah. Um because it's a sewer cost,
[1:56:58]
>> okay?
[1:56:59]
>> And it's not a cost of people that are
[1:57:01]
not on sewer currently. And if you took
[1:57:04]
the board took action on this before I
[1:57:05]
was here and you had
[1:57:07]
>> you had Ellers come in and give you an
[1:57:09]
option. You could borrow or you could
[1:57:11]
take it from the reserves. Decided to
[1:57:13]
take it from the reserves.
[1:57:14]
>> Well, yeah, because
[1:57:15]
>> you'd be paying back the money anyways
[1:57:16]
after you borrowed for it
[1:57:18]
>> over sewer rates over a long period of
[1:57:20]
time, which is exactly what we're doing
[1:57:22]
now. You're paying it back over a long
[1:57:24]
period of time. from sewer rates. And as
[1:57:25]
soon as Yes. you get sewer expand your
[1:57:28]
sewer service area, get more sewer
[1:57:30]
customers online,
[1:57:32]
>> Mhm.
[1:57:32]
>> they pay a connection fee. Part of that
[1:57:34]
connection fee is to replenish the costs
[1:57:36]
of future expenses for sewer, just as
[1:57:40]
you did back when you bought into the
[1:57:42]
sewer district.
[1:57:43]
>> We were the only ones in it in the town
[1:57:45]
here. And so it wasn't the whole area.
[1:57:48]
It was we had to pay our fair share. Not
[1:57:50]
a dollar came out of the citizens
[1:57:52]
pockets. we paid for it over whatever
[1:57:55]
and the town made sure that they took
[1:57:57]
out a loan for it. I'm just saying when
[1:58:00]
I talked to you originally, Dan, you had
[1:58:02]
said that we could get reimbursed as new
[1:58:04]
people come online and now you're not saying that anymore.
[1:58:09]
>> I just said that you would new users are
[1:58:12]
going to pay fees to get online which is
[1:58:15]
going to co help supplement cost for
[1:58:17]
future use and
[1:58:19]
>> right
[1:58:20]
>> for the capacity that they're using.
[1:58:22]
Okay. Is the
[1:58:23]
>> which is essentially the same thing.
[1:58:24]
>> Is is is the sewer fund ever going to be
[1:58:27]
reimbursed
[1:58:29]
ever from future users for that $825,000
[1:58:32]
that we forced to pay?
[1:58:34]
>> It will be made up over fees and you're
[1:58:36]
going to charge fees to new users as
[1:58:38]
well as that. So when that happens in
[1:58:41]
years down the road,
[1:58:43]
>> it's going to benefit new people, not
[1:58:45]
the people online. That's what I have a
[1:58:47]
problem with. And because you you bought
[1:58:49]
in an facilities upgrade, you had money
[1:58:52]
in reserves to pay for it. When we spend
[1:58:54]
money in general, the general fund, we
[1:58:57]
buy a piece of equipment.
[1:58:59]
>> We don't go, we don't then replenish
[1:59:02]
that exactly for the same amount that we
[1:59:05]
had. We want to make sure that we have
[1:59:06]
enough money in there that's legally
[1:59:08]
required. If we have more, great. We're
[1:59:10]
not trying to recover $800,000
[1:59:13]
from sewer.
[1:59:14]
>> Exactly. I know that. So, so no, we're
[1:59:17]
not going to make sure that we have we
[1:59:19]
replace that whole entire amount. We're
[1:59:21]
going to make sure that we have enough
[1:59:22]
that's required and over time that that
[1:59:24]
amount will build up.
[1:59:25]
>> I understand that. But
[1:59:26]
>> fees go up. Yeah. I mean, I understand
[1:59:28]
that and that's why our fees are going
[1:59:30]
up. Everybody's taxes are going up.
[1:59:31]
That's that's indisputable. But I'm just
[1:59:34]
saying that when we have time comes that
[1:59:36]
we have to borrow money to fix the
[1:59:38]
repair,
[1:59:40]
>> then we'll have to borrow it.
[1:59:41]
>> We will have to borrow it. And I'm just
[1:59:44]
saying,
[1:59:46]
you know, that even I have even written
[1:59:47]
on here the 825,000 if even if we're
[1:59:50]
split somehow to help the district out
[1:59:53]
instead of bankrupting them and to
[1:59:55]
borrow money down the road. And that's
[1:59:57]
just what I'm saying.
[1:59:58]
>> Well, and we can certainly look at if if
[2:00:01]
that situation comes up, we did the same
[2:00:03]
thing with the TID. We borrowed money
[2:00:04]
from ourselves to pay back for the TID.
[2:00:06]
We could look at that as an option to
[2:00:07]
save money for the utility of in case
[2:00:09]
you know interest rates are incredibly
[2:00:11]
high that you don't want to borrow the
[2:00:13]
money through ellers or through
[2:00:16]
>> state bank or something like that.
[2:00:17]
That's completely up to the board how
[2:00:18]
they want to fund that practice.
[2:00:19]
>> So the new people in a year or two or
[2:00:21]
three are going to benefit from all the
[2:00:23]
upgrades that the current people are
[2:00:25]
using.
[2:00:26]
>> They're going to pay an impact fee.
[2:00:28]
They're going to pay a $5,000 $10,000
[2:00:30]
connection fee
[2:00:31]
>> that's going to uh you know reimburse
[2:00:34]
for push. But that's what I heard said.
[2:00:35]
Yeah.
[2:00:36]
>> All the sewer users are coming out of
[2:00:37]
the same pot, right? Even new ones that
[2:00:39]
are
[2:00:40]
>> same. No. I mean, so there's
[2:00:42]
>> there's like
[2:00:44]
>> it's not a new
[2:00:46]
sharing the same utility.
[2:00:47]
>> And I I will point out say there is a
[2:00:49]
catastrophic failure in the old system
[2:00:52]
under current day.
[2:00:53]
>> Yeah.
[2:00:54]
>> That fund if it is depleted, who's going
[2:00:56]
to be paying for it?
[2:00:58]
>> We 452 homes.
[2:01:01]
>> Everyone is going to pay for it.
[2:01:02]
>> Oh, let me get this straight now. Say
[2:01:04]
that again.
[2:01:05]
>> If the if there is a catastrophic
[2:01:07]
failure that exceeds the current fund
[2:01:09]
balance of the sewer fund, who has to
[2:01:13]
pay for that?
[2:01:15]
>> I thought, and maybe I'm wrong and and
[2:01:18]
thank you. Um I thought the sewer fund
[2:01:20]
had to pay for that. The foreign 52
[2:01:22]
homes. So you're saying the whole
[2:01:24]
village pays for it.
[2:01:26]
>> Who is going to pay for it?
[2:01:27]
>> That's what I'm saying. Well, the sewer
[2:01:30]
fund take out the loan.
[2:01:31]
>> If the sewer fund is depleted, who's
[2:01:32]
going to pay for it?
[2:01:33]
>> Exactly.
[2:01:34]
>> So, there's only two options.
[2:01:36]
>> Yeah.
[2:01:36]
>> It's either user fees or everyone.
[2:01:38]
>> Yeah.
[2:01:41]
>> But
[2:01:43]
>> if you take out a loan,
[2:01:46]
it's going to be paid back by the users
[2:01:48]
of the sewer.
[2:01:49]
>> Yeah.
[2:01:50]
>> Right.
[2:01:51]
>> That's what it should be. So therefore,
[2:01:54]
why should the users of the sewer not
[2:01:55]
pay for the why should the users of the
[2:01:58]
eight users of the sewer not pay for the
[2:02:00]
800? Answer that question.
[2:02:02]
>> Because
[2:02:04]
it's for the benefit of the future users
[2:02:06]
for the the village here on K over here.
[2:02:10]
They're going to benefit from the new
[2:02:12]
upgrades.
[2:02:13]
>> But it's also to preserve the prior
[2:02:15]
infrastructure that was put in place.
[2:02:17]
>> Yeah. Yeah. Oh, I understand. And they
[2:02:19]
have to we
[2:02:20]
>> we have way more old users than we do
[2:02:22]
future users.
[2:02:23]
>> Yeah.
[2:02:24]
>> And
[2:02:24]
>> probably you're right
[2:02:26]
>> because it's never going to happen
[2:02:27]
again. What was happened to these people
[2:02:29]
over here? It's never going to happen.
[2:02:32]
>> I mean I I can I can totally sympathize
[2:02:34]
if there's some new injustice that's
[2:02:37]
going on, but we don't we don't have any
[2:02:39]
new users.
[2:02:41]
>> I mean they're they're so minimal.
[2:02:42]
>> Okay. I personally and that's why I I
[2:02:44]
just think because the town stepped up
[2:02:47]
to help that the villagers stepped up to
[2:02:49]
help rather than depleting this fund so
[2:02:52]
much. That's all.
[2:02:54]
>> But in one in one thing you're saying
[2:02:57]
it's our money. Let's use it only for
[2:02:59]
us.
[2:02:59]
>> But then you're also saying if we don't
[2:03:01]
have the money, everyone needs to help
[2:03:03]
us.
[2:03:04]
>> Well, you said that and I I you said the
[2:03:06]
village is going to, you know, if we
[2:03:07]
have a problem.
[2:03:08]
>> He he did not say that. He was he was he
[2:03:10]
was trying to get
[2:03:10]
>> It was a hypothetical. Yeah, I
[2:03:12]
understand that. But that's what I stood
[2:03:14]
understood. So, and I understand and I
[2:03:16]
don't want to go back and forth on this.
[2:03:17]
It's just
[2:03:18]
>> But we have to we have to we have to put
[2:03:20]
this to bed.
[2:03:20]
>> Okay.
[2:03:21]
>> There is no more sanitary district.
[2:03:24]
There is no more us of the or it is the
[2:03:27]
we of the future.
[2:03:27]
>> I know that.
[2:03:28]
>> But you keep going back to it though.
[2:03:30]
>> It's the sewer fund.
[2:03:32]
>> It's a sewer fund.
[2:03:34]
>> And one day that's gonna be gone.
[2:03:37]
It will be gone because the the million2
[2:03:39]
that that the sewer district borrow over
[2:03:42]
to the sewer fund is being depleted. The
[2:03:45]
million two that Rick and I have
[2:03:48]
hundreds of dollars in this thing. Other
[2:03:50]
people have hundreds of dollars in this
[2:03:52]
thing that we're depleting for the
[2:03:55]
upgrade. And and that we're paying for
[2:03:57]
that directly. We are paying for that.
[2:04:00]
Nobody else is
[2:04:01]
>> because you're the only ones using it.
[2:04:03]
But down the road, and I know that's
[2:04:05]
your point of I know nobody wants to pay
[2:04:07]
for for something they don't get. I
[2:04:09]
understand that. But K over here is
[2:04:12]
going to be sewarded over here, you
[2:04:14]
know.
[2:04:15]
>> Yeah. So then they would get lumped into
[2:04:16]
this 452 and then it's going to be 500
[2:04:19]
people or 600 or 1000.
[2:04:20]
>> How are they going to pay? How are they
[2:04:22]
going to help us replete our
[2:04:25]
>> not as much about how much goes in
[2:04:27]
there? But if your pipe fails, the guy
[2:04:29]
on K is going to be helping pay for your
[2:04:31]
pipe up there. And vice versa, if his
[2:04:33]
pipe fails, you're going to help pay for
[2:04:35]
his.
[2:04:35]
>> But Linda, it's no different.
[2:04:36]
>> Everybody in the sewers all together,
[2:04:37]
>> it's no different than the what we talk
[2:04:39]
about with failed septic systems or
[2:04:41]
failed wells or something like that. And
[2:04:44]
from a personal standpoint, if I save up
[2:04:45]
a bunch of money and I've got $50,000 in
[2:04:48]
bank account and yes, I did it and then
[2:04:50]
my well goes goes out, then there goes
[2:04:53]
half of that. It's depleted. I don't ask
[2:04:55]
how he was going to replace it. It's
[2:04:57]
going to be the user, which is me, to
[2:04:59]
replace the money that I've saved.
[2:05:01]
>> See, and then when this was set up years
[2:05:03]
ago, there was a district one and a
[2:05:05]
district two. I don't know if you know
[2:05:07]
that. Senator Distant number one is us
[2:05:09]
on on sewer now. Sister District two
[2:05:13]
that's really bad sewer systems, septic
[2:05:16]
systems, is the one over off of um is it
[2:05:20]
Richmond Road that they're coming in
[2:05:22]
with new with new wells that the pore is
[2:05:24]
paying for. We know that those subject
[2:05:26]
systems are bad over there. We were told
[2:05:28]
that they were they were sanitary
[2:05:31]
district number two. And if each of the
[2:05:33]
district had an issue, the issue we
[2:05:37]
would pay for our own, they pay for
[2:05:39]
their own. That's how it was presented.
[2:05:41]
So that's why I guess I just kind of,
[2:05:44]
you know, thinking, well, they're going
[2:05:45]
to benefit from our upgrades that we're
[2:05:48]
paying for and we are paying for it on
[2:05:50]
our backs. We are paying for it. Why
[2:05:53]
doesn't why can't we be reimbursed
[2:05:55]
somewhat for that?
[2:05:56]
>> It make more sense. The more users you
[2:05:58]
have on a system type like this, you
[2:06:00]
want
[2:06:02]
>> I guess let's relate it to a school
[2:06:03]
district. Okay? I don't I know we're not
[2:06:05]
a school district, but a school district
[2:06:08]
imposes a referendum today.
[2:06:12]
>> Next year, 10 new families come into the
[2:06:15]
school district.
[2:06:18]
How do they pay for how do they pay for
[2:06:20]
their impact
[2:06:21]
>> on the system
[2:06:23]
>> through impact fees and user fees?
[2:06:26]
>> There's no impact fees in schools.
[2:06:28]
>> No, no, no. I'm just saying if we're
[2:06:30]
equating it to to to
[2:06:33]
a sewer
[2:06:34]
>> and saying they there's an impact fee in
[2:06:36]
the sewer that
[2:06:38]
>> So, can we have an impact fee then that
[2:06:41]
will be attached? We make sure.
[2:06:42]
>> Yeah. I mean, that's all part of the
[2:06:43]
discussion with the sewer service is
[2:06:45]
we're we're going to revitalize the
[2:06:47]
code, which is why we kind of held it
[2:06:50]
off because we have to add
[2:06:51]
>> I don't think any amount could be in
[2:06:53]
there though. There should be the amount
[2:06:54]
at the time because it might be too low.
[2:06:57]
Are you going to put a dollar amount for
[2:06:58]
impact fee?
[2:06:59]
>> There will be a dollar amount. It'll be
[2:07:00]
based on, you know, future expended
[2:07:04]
costs and, you know, whatever else that both kind of works with us on. But,
[2:07:08]
I mean, there's an impact fee and a
[2:07:09]
sewer connection fee now. I mean,
[2:07:12]
>> so it'll be large. It'll be larger most
[2:07:14]
likely,
[2:07:14]
>> most likely when we move forward. So,
[2:07:16]
>> yeah.
[2:07:17]
>> And then that will be in a pot of money
[2:07:20]
that will sit there and they might
[2:07:22]
complain for the fact that they have to
[2:07:24]
pay $25,000 and the original people only
[2:07:27]
had to pay $15,000
[2:07:30]
>> or whatever it is. And I and I
[2:07:32]
understand you your your viewpoints and
[2:07:34]
I know I'm an odd
[2:07:36]
>> I I don't I I'm I guess here's my ask. I
[2:07:39]
don't understand your viewpoint.
[2:07:41]
>> Okay.
[2:07:41]
>> What is the ask of the board today for this?
[2:07:45]
>> I guess I'm for one thing. The important
[2:07:47]
thing was that the fire station pay
[2:07:49]
their their costs and then I wanted to
[2:07:52]
talk about this $825,000
[2:07:55]
that so we'll be left with $375,000.
[2:07:58]
one issue that money is gone. Now we
[2:08:01]
have to take
[2:08:02]
>> what is what is the solution that you
[2:08:03]
want the board to
[2:08:04]
>> village to come in to help since they took out a loan in the beginning.
[2:08:08]
>> Help with what though?
[2:08:09]
>> If if we have any issue that we're we're
[2:08:12]
bankrupt because we paid off the 825,000
[2:08:15]
and people on K over here is going to
[2:08:17]
benefit from the 825,000 improvement
[2:08:19]
because there's always continuous
[2:08:21]
expenses that we have paid over the
[2:08:23]
years. Yes. to Sussex, but nothing like
[2:08:26]
this $825,000.
[2:08:29]
So, this is a 30-year project that
[2:08:31]
they're doing that they have to upgrade.
[2:08:33]
>> But we don't So, we don't have any users
[2:08:35]
on Highway K.
[2:08:36]
>> We will.
[2:08:37]
>> We We do not know that.
[2:08:38]
>> I know.
[2:08:39]
>> We have not approved that.
[2:08:40]
>> Okay.
[2:08:41]
>> And we do we do not know that.
[2:08:42]
>> Okay. And you know, this is another
[2:08:44]
thing. Who pays for a fund pays for
[2:08:46]
that? So, we all pay for those fund
[2:08:48]
costs over there, don't we?
[2:08:51]
I mean we haven't really even got to
[2:08:53]
that point.
[2:08:53]
>> You told me you told me that the whole village pays for it Dan
[2:08:57]
including the sewer district. We pay
[2:08:59]
>> we pay we pay for the study that we're
[2:09:02]
talking about for sewer. There is a
[2:09:05]
separate cost.
[2:09:06]
>> So we are paying for it too. The the
[2:09:08]
sewer fund is is getting we're paying
[2:09:10]
for our taxes the taxes what we're
[2:09:13]
paying on our taxes.
[2:09:15]
>> It's money that was set aside a long
[2:09:17]
time ago and sitting in a fun bonded. I
[2:09:19]
know I know that you said but it's still the towns or the villages
[2:09:24]
money that we have paid into. So in
[2:09:26]
essence
[2:09:26]
>> so you're yes everybody is paying.
[2:09:30]
>> So in essence we have paid our own fair
[2:09:32]
share continue to pay fair and yet we
[2:09:34]
pay for it in this fund over here for
[2:09:36]
their sewer.
[2:09:36]
>> You're paying your tax bill. Yes
[2:09:38]
>> I know I know that's another thing we're
[2:09:40]
paying for. So if if the ask is that if
[2:09:44]
there's a large expenditure and the
[2:09:47]
village has to asssure that the senate
[2:09:51]
>> their users does not go bankrupt. I I I
[2:09:54]
think we've heard that that that the
[2:09:56]
village will will make sure that that does not happen
[2:09:59]
>> that we're helped by the village.
[2:10:01]
>> I I I mean and and what what that means is is it will have to be
[2:10:05]
debated at and figured out but yes we're
[2:10:07]
not going to let it
[2:10:08]
>> go bankrupt. Oh, you know, I I know
[2:10:11]
because not being in in in the on the
[2:10:13]
utility, you don't understand what's all
[2:10:15]
going on. So, I just felt it was the
[2:10:17]
time that we need to bring this all out,
[2:10:19]
put it to bed, and let's just get it
[2:10:21]
squared away so you guys can realize in
[2:10:24]
five years if sewer's going on over
[2:10:26]
there. Wait a minute now. How about
[2:10:28]
reimbursing, you know, impact fee for
[2:10:30]
what we had to pay for the $825,000?
[2:10:34]
That's all.
[2:10:35]
>> So, I think so. Again, we we're going to
[2:10:37]
have a one uh issue on the next agenda
[2:10:39]
for formal action. The uh the um fire
[2:10:43]
department, we're taking care of that as
[2:10:45]
was agreed to tonight, which was doesn't
[2:10:47]
need formal action. And this last one we
[2:10:49]
we've discussed and I think we have an
[2:10:53]
understanding, right?
[2:10:55]
>> So, I think to to your point, Mark, I
[2:10:57]
mean I mean and Linda, does does this
[2:11:00]
clear things?
[2:11:01]
>> It's fine. Well, does it does it address
[2:11:05]
these concerns moving forward? Because I
[2:11:07]
think the board wants to to make sure
[2:11:09]
that we're adequately listening and
[2:11:11]
addressing it instead of just we don't
[2:11:13]
want to feel like you're getting pushed away and then it still fers and
[2:11:17]
we and you feel as though we need to
[2:11:19]
come back here in a month or two. Are we
[2:11:22]
>> have we did we resolved the the main
[2:11:24]
issues that you had?
[2:11:25]
>> I I think so. I think so. And I'll try
[2:11:28]
to do better, but this is the sore spot.
[2:11:30]
No, I I think I think having some stuff
[2:11:32]
written out tonight and having it on the
[2:11:34]
agenda was I think we we got there and
[2:11:36]
this this was this was helpful.
[2:11:38]
>> We're going to have to tackle any
[2:11:39]
problem that comes our way.
[2:11:42]
>> Right. So, the last item tonight is uh
[2:11:45]
discussion and necessary action
[2:11:46]
regarding the replacement plan for
[2:11:48]
engine 30.
[2:11:51]
uh bringing this back. I had to send you
[2:11:54]
guys all the list of pairs that you had
[2:11:57]
requested from the fire department going
[2:12:00]
back to 4.
[2:12:03]
Um
[2:12:04]
>> so when I sent out packets on Friday, I
[2:12:07]
sent a follow-up email with a 54 page
[2:12:10]
PDF attachment. I did not print it
[2:12:12]
because it was 54 pages
[2:12:14]
>> and I I didn't really want it printed
[2:12:16]
and she asked me because of the fact
[2:12:18]
that they're just a bunch of repair
[2:12:19]
bills. you guys want to look at them,
[2:12:22]
they're there. Um the I had I did have a
[2:12:25]
discussion with um Mr. Oman regarding
[2:12:28]
this too and he had talked back about
[2:12:30]
contract negotiations though it wasn't
[2:12:32]
written that they did talk about a time
[2:12:35]
frame of around 12 years replacement for
[2:12:37]
that fire engine. So um I'm not asking
[2:12:40]
that we make formal action to replace
[2:12:44]
the fire truck. I'm just asking that we
[2:12:46]
discuss authorizing, getting the
[2:12:50]
coordinating, getting a group together
[2:12:52]
to even discuss
[2:12:54]
potential replacement because once you
[2:12:57]
put that order in for a firet truck,
[2:12:59]
which we're still probably going to be
[2:13:00]
six, eight months, eight months away
[2:13:02]
after we spec out what we want, it's
[2:13:05]
going to be a two to three year way
[2:13:06]
after that.
[2:13:07]
>> Will you put that in the budget then for
[2:13:09]
that?
[2:13:09]
>> Yeah, we already got
[2:13:11]
>> money. There's money in there already.
[2:13:12]
We're doing 200 and some thousand in.
[2:13:14]
And I had in my notes that we were at uh
[2:13:17]
in talking to to Joe as well as the fire
[2:13:20]
chief in previous meetings, we were at 12 to 15 years on the fire engine
[2:13:26]
replacement and and our second fund
[2:13:28]
calculation has it at 13 years. I went
[2:13:30]
back and looked at that
[2:13:31]
>> and 13 years would be right on par if we
[2:13:34]
started discussions now because they're literally three years out for
[2:13:38]
some. summer, too. But I mean, we're
[2:13:39]
going to be talking about it for six to
[2:13:41]
eight months. That's kind of how what
[2:13:43]
happened with the tender as well.
[2:13:45]
>> I I I wasn't comfortable off, you know,
[2:13:47]
uh moving forward with with the purchase
[2:13:50]
at this point or authorizing that, but
[2:13:52]
if if we wanted to take action to form
[2:13:54]
the committee or form a group to to look
[2:13:57]
at it, um I would have more comfort with
[2:13:59]
that. Um, and I think Rob made some good
[2:14:03]
points at the last meeting that can be
[2:14:05]
pushed off a little bit longer with with
[2:14:07]
some repairs. Um, I guess I wanted to
[2:14:10]
kind of and then the whole how that
[2:14:13]
engine is used over there and that that
[2:14:15]
engine is going into Piwaukee. You guys,
[2:14:18]
that engine's going into Piwaukee a lot
[2:14:20]
and it's serving as an ambulance. I
[2:14:22]
don't I'm not comfortable with the way
[2:14:23]
that we're doing this this at all. So,
[2:14:25]
this this has to be part of a bigger
[2:14:27]
discussion. Me, too. before we move
[2:14:28]
forward with
[2:14:29]
>> Thank you for bringing that up.
[2:14:31]
>> I'm not saying that we don't don't that
[2:14:33]
we don't you know have to get this this engine and replace it in 3 years
[2:14:39]
but I'm saying it needs we need a larger
[2:14:40]
discussion.
[2:14:41]
>> Exactly. or I don't want to cheap out on
[2:14:43]
it, but I also want to just buy one just
[2:14:45]
for the sake of buying one because
[2:14:47]
>> sure
[2:14:50]
that doesn't mean that we have to pull a
[2:14:51]
trigger, but
[2:14:52]
>> should at least consider it given what
[2:14:54]
the time frame is that we have budgeted
[2:14:56]
and what was discussed
[2:14:58]
>> not written any contract but discussed
[2:14:59]
during
[2:15:02]
right now.
[2:15:03]
>> What is the fire apparatus team? Well,
[2:15:06]
at the time we did the tender, it was
[2:15:09]
the deputy chief from Pewwaukee, the
[2:15:11]
fire chief from Pewwaukee, um, Mark
[2:15:14]
Poppy, and Doug Braum, and then myself.
[2:15:20]
» Is that changed now? He's on the fire
[2:15:22]
advisory,
[2:15:24]
uh, Mr. Braum.
[2:15:26]
>> Um, no, no, no, no. Well, no. Doug, Doug
[2:15:29]
is on the, uh, commission.
[2:15:33]
>> Commission advisory.
[2:15:34]
>> Yeah. So, and Rob has come uh uh to the
[2:15:38]
what do you call the the joint
[2:15:41]
>> which has been which has been um the
[2:15:44]
administrator, the chief elected
[2:15:46]
official and one other person from the
[2:15:48]
city, the village and the village.
[2:15:51]
Um,
[2:15:53]
>> as far as specking out a truck, I mean,
[2:15:54]
obviously we want to take input from
[2:15:57]
what the back fighter department has to
[2:15:59]
say, but I think we were using having
[2:16:01]
Doug be there as kind of the village
[2:16:03]
representative, understanding what the
[2:16:05]
villages needs were or apparatus, and
[2:16:08]
then I was in there just to make sure
[2:16:09]
they weren't spending money like this.
[2:16:12]
>> Well, I mean,
[2:16:14]
I I love Doug, but I mean, I might feel
[2:16:17]
a little more comfortable with Rob being
[2:16:19]
I mean,
[2:16:21]
Uh, can can we have both?
[2:16:24]
>> I don't know anything about specking out
[2:16:25]
a fire truck,
[2:16:26]
>> but I think when they're talking about
[2:16:28]
items, maybe you'd be better at at at
[2:16:31]
kind of hearing what is more of a
[2:16:33]
>> We have no recourse against Mr. Brown.
[2:16:35]
>> Yeah,
[2:16:37]
>> I think that's what he's trying to say.
[2:16:38]
>> Yeah,
[2:16:38]
>> he he he he really loves the fire
[2:16:40]
department and he loves to have stuff
[2:16:42]
for him. Yeah.
[2:16:43]
>> While I was on it, I don't know the
[2:16:44]
insides if this pump's going to be
[2:16:46]
better than that pump, right? You know,
[2:16:48]
this or that.
[2:16:50]
Although if I mean obvious something
[2:16:52]
obvious like
[2:16:54]
you know why do we need 10 light bars on
[2:16:56]
instead of two but
[2:16:59]
>> we'll do well
[2:17:01]
>> right so let's let's move forward with
[2:17:02]
this and then we'll we'll we'll kind of
[2:17:04]
maybe circle back
[2:17:04]
>> say we don't have to have the committee
[2:17:06]
decided
[2:17:07]
>> right so maybe we'll circle back on that team at the next meeting
[2:17:11]
>> y
[2:17:11]
>> all right so do we want to do want a
[2:17:13]
motion then
[2:17:14]
>> uh yeah please
[2:17:17]
>> uh so is there a motion to authorize the
[2:17:19]
village administ to begin coordinating
[2:17:21]
with the fire apparatus team to begin uh
[2:17:24]
fire truck configuration.
[2:17:25]
>> So moved.
[2:17:26]
>> Seconded.
[2:17:27]
>> Any discussion?
[2:17:30]
>> Hearing none. All those in favor say I.
[2:17:32]
>> Say nay.
[2:17:33]
>> Motion carries. Um is there a motion to
[2:17:36]
adjurnn?
[2:17:37]
>> I make a motion.
[2:17:38]
>> Second. All those in favor say I. I.
[2:17:41]
>> Say nay. Motion carries. We're journed
[2:17:44]
at 8:49.
[2:17:47]
It's a sore spot with with us original.
[2:17:51]
>> Oh, that's