Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:12]
so
[0:16]
uh
[0:46]
okay we are live we're just waiting on
[1:06]
i guess technically gives way to seven
[1:12]
hello alexandra hello
hi
[1:26]
uh dan is uh is debbie with you
[1:35]
wait uh just two minutes
[2:04]
well
[2:12]
[Music]
[2:15]
this one
[2:38]
okay debbie ready
[3:00]
she said go ahead
[3:03]
okay good evening this is a board of
zoning appeals meeting uh for mayfield
[3:07]
village
today is may 2nd 2022
[3:12]
uh
um this is uh this meeting is being held
[3:16]
via zoom today
and it is six o'clock
[3:21]
uh first uh order of business uh that we
have is consideration of meeting minutes
[3:26]
for april 19 2022.
make a motion to accept
[3:32]
second
one call
[3:40]
you to speak labor systems
[3:44]
yes
yes
[3:49]
yes
[3:52]
that's approved
we have one case on the uh the daca
[3:56]
today case number twenty two zero two
twos uh-04 the applicant is uh john and
[4:02]
jennifer jurisic
uh of 721 robbery lane
[4:07]
uh mayfield village four four zero four
zero
[4:11]
uh permanent parcel number eight
831-25-018
[4:16]
it's a request for an eight-foot wide
variance from section
[4:22]
1119.09c to allow for construction of a
24
[4:26]
foot wide driveway
a budding property owners on robley lane
[4:31]
have been notified
[4:36]
and
jennifer are you going to
[4:39]
state your case if so i need to swear
you in
[4:42]
i can
okay uh if you could just hold your
[4:46]
hand up do you swear to tell the truth
the whole truth and nothing but the
[4:50]
truth i do okay uh state your case
uh i i know i've provided uh some
[4:56]
lengthy um
documentation to the board but just as a
[5:02]
review
uh we currently have an asphalt driveway
[5:06]
with the concrete apron the concrete
apron came about uh with the sewer
[5:11]
replacement or the sewer
conversion
[5:14]
and we are looking to replace our
asphalt driveway which is um by the
[5:19]
pictures that i have
pictures don't do it justice for how
[5:22]
terrible it is um we are replacing we
want to replace the asphalt driveway
[5:27]
with concrete to match the apron
the asphalt driveway is currently 15
[5:32]
feet we are asking for a variance for 17
feet you could see at the bottom end of
[5:39]
the concrete driveway there's water
that's pooling
[5:42]
um
we
[5:44]
for a couple of reasons so um
you know the 15 feet is obviously small
[5:49]
we have two bigger suvs
so the variance the small feet foot
[5:54]
variants there would help correct that
flooding that happens at the end of the
[6:00]
concrete driveway
back when the apron was first pulled
[6:04]
after the sewer conversion we had
brought it to the attention of mr
[6:08]
morella's attention uh several times
but it was one of those that it was sort
[6:13]
of wait and see what happened they were
going to come back and grade it a little
[6:18]
bit better uh the the company that was
doing the the concrete that never
[6:23]
happened and so we constantly have water
pooling there uh in addition to that we
[6:29]
have um a third driver almost almost the
third driver in the house and we are
[6:36]
looking um just to have a small parking
pad just for a small sedan
[6:41]
in the side of our house uh
that would fit that car so we're
[6:46]
constantly not juggling cars around
um
[6:51]
as it is right now we sort of juggle
cars around with the third car um in the
[6:54]
driveway it would it would be a
hindrance
[6:57]
to us and then
um we have a basketball hoop the kids
[7:00]
playing in the driveway i have two other
children too um so in total we were just
[7:05]
looking for something like that
um as i mentioned we plan on doing um
[7:10]
right now we actually had a flower bed
in that place where the parking pad is
[7:14]
we haven't replaced it so it's sort of
um
[7:19]
yes right there so there was a flower
bed there that was surrounded by brick
[7:23]
we had taken it out
knowing that we were probably going to
[7:26]
want to do this so it actually doesn't
extend any further than the flower the
[7:31]
circular flower bed that was there
um
[7:34]
so we would like to do that we've talked
with
[7:38]
the neighbors
mr and mrs rodriguez who are on that
[7:42]
side
they have no issues with it
[7:46]
in addition we talked to
the abutting property owners that are
[7:50]
listed here we've talked to over half of
them
[7:55]
to us or i've seen them out
since the notice has been set out
[8:00]
no one has any kind of objection at all
some of these abutting property owners
[8:05]
themselves have
parking pads
[8:09]
some smaller some bigger than us i
included
[8:13]
some
driveways just for
[8:16]
to demonstrate the variability
on robly so
[8:20]
our what i feel like what we're asking
the board does not
[8:25]
is not exorbitant compared to what's on
the street and it wouldn't stand out
[8:29]
um
after we get the parking pad in we would
[8:33]
actually plan on doing landscaping
around that so it doesn't stand out
[8:38]
we're actually going to have matching
landscaping
[8:40]
um on both the left and right side of
our house
[8:43]
after we're all said and done so
i i know i provided a lot of information
[8:48]
in the packets but i'm happy to answer
any kind of questions if there are some
[8:52]
thanks jennifer and just to be clear
here uh and i think i missed it but uh
[8:56]
uh dan correct me if i'm wrong
she's asking for two variances is that
[9:01]
right one of uh the 16 feet
um
[9:05]
for the majority of the driveway and
then 24 feet is that true or
[9:10]
just one i think it's the distance to
the next property because it's nine feet
[9:14]
instead of ten
so
[9:17]
there's nine feet there's nine feet
still between our what what would be
[9:21]
between our property line and the next
property line so we actually exceed the
[9:25]
three feet minimum okay
for that um so it would just be the
[9:30]
the two feet running down well the
two feet that's running down to the one
[9:34]
foot so i think it's actually like eight
feet um an eight foot variance in one
[9:38]
part of our driveway and then half below
would be um just a one foot
[9:49]
feet variance uh because you're allowed
to have 16 right now they have 15 feet
[9:53]
um and you want to do 24 at the at the
pad to the garage so
[9:59]
you have to look at
two variances of one foot variance
[10:09]
hey dan let me make sure i heard you're
a little bit sounds like you're in a
[10:13]
hallway
or if you can get closer to the mic
[10:16]
perhaps
uh so so you are saying that there are
[10:19]
two variances being requested here one
uh one foot variance of the 16 feet and
[10:23]
then
an eight foot uh variance also
[10:29]
look at that way i just did a one
variance
[10:32]
the total width of 24 feet
um 16 feet is allowed and they wanted to
[10:38]
extend
the upper portion much larger so i went
[10:41]
with a much larger variance
request but yeah it i mean it could be
[10:48]
two if you really want it to be two uh
the one foot um
[10:53]
extension with at the lower end of the
driveway then
[10:57]
the upper portion near the garage is an
additional parking pad which you
[11:01]
extended their seven feet
of width
[11:04]
yeah thanks for that and i'm i'm sorry
diane um are you are you counsel i i
[11:09]
haven't met you before yes i'm sorry yes
i'm diane carlton it's nice to meet you
[11:14]
thank you pleasure
okay uh i just want to make sure that's
[11:17]
uh clear there too uh john or uh
alexandra any thoughts
[11:22]
yeah so i uh heard you mentioned that uh
you didn't have this issue with the
[11:26]
water pooling before the sewer
replacements
[11:29]
um well it was because it was asphalt
the whole way down and we had the ditch
[11:33]
so we had a big ditch there okay um if
they just didn't
[11:38]
grade it enough that there needs to be
more of a decline into the ditch so
[11:43]
that's so what what we're saying though
is that there are the changes that were
[11:47]
made to improve the sewers in the
village caused
[11:50]
sort of specific circumstances to your
property that requires this variance
[11:56]
correct for that piece of advice that is
correct
[12:00]
and i have a question for you and steve
you're saying it's a one foot uh
[12:05]
variance for that one section the whole
length but according to drawing it says
[12:09]
two feet
[12:12]
well the existing driveway is 15 feet
now you're allowed 16 feet well but the
[12:16]
variance is
drawing shows they want a two-foot
[12:19]
variance
right but you're allowed to have 16 16
[12:22]
feet of one it's just one foot
is beyond what you're allowed
[12:28]
jennifer yes when i drove by the house
you have one large tree
[12:32]
on the right hand side of the driveway
that's gonna be close to the
[12:37]
new pad how's that going to be protected
uh that will be protected so uh actually
[12:42]
that's a good picture to look at so
um we are coming up
[12:47]
um
right where that dirt spot is is sort of
[12:51]
where up a little bit more is where the
cutaway would be to for the start of the
[12:57]
pad it actually won't impact that tree
at all so the tree the tree would
[13:03]
remain healthy we have no plans to doing
anything with that tree um we have to
[13:08]
it has you know it's we keep care of it
and trim it as we need to we have no
[13:12]
plans to remove it
very good
[13:20]
uh alexandra or
john we actually thought that keeping
[13:24]
that tree as well in addition keeping
that tree
[13:27]
um helps with the landscaping too so
it's you know what screens it from the
[13:31]
view so
correct
[13:35]
and it does look you know if you look at
the google maps um aerial photo like
[13:39]
just two driveways down there's one that
looks
[13:42]
almost twice as wide as the current
width
[13:45]
that is actually um
mr monk that is actually one of the
[13:48]
pictures that i have
there um for the comparison
[13:53]
yeah so there are definitely wider
driveways in the neighborhood
[13:59]
this is similar to a pad that was
requested last one on a different
[14:02]
property too
[14:05]
we are actually it would be mirroring
the 689 robley right there is what it
[14:10]
would be very close to so the top left
picture
[14:14]
is where it would be very close to
um for us
[14:19]
that would be right where i think this
one is different is that they're
[14:22]
correcting a drainage issue because
that's going to destabilize the driveway
[14:27]
so they're repairing a flaw that wasn't
there before and so it's a unique
[14:31]
feature of this plot
[14:38]
um
[14:40]
the
two feet so the six to 17 feet versus
[14:44]
the 16 feet jennifer
um
[14:47]
[Music]
you're saying is exclusively
[14:50]
to uh help with the uh the drainage
issue is that correct
[14:54]
that is correct so if you um
one of the pictures that sort of shows
[14:59]
the water pooling on it
right there if you take that and you you
[15:03]
pretty much measure that that is roughly
two feet right there
[15:12]
okay from the board any other thoughts
[15:18]
so information on the paperwork that she
sent out so
[15:22]
most of the stuff was answered there
okay
[15:25]
very very good so then the conditions
upon which an application for variance
[15:28]
is based are particularly
i'm sorry uh
[15:32]
um considering whether there's a
practical difficulty we have to look at
[15:35]
whether the conditions upon which an
application for variance is based or
[15:39]
particularly the subject property with
respect to the physical size
[15:42]
shape or other characteristics of the
premises or joining premises
[15:46]
differentiating it from other premises
in the same district or the variance
[15:51]
would result in an improvement of the
property that is more appropriate more
[15:54]
beneficial to the community than would
be the case without granting
[15:58]
of the variance
i see both those conditions being met
[16:02]
uh so we'd look for a um
a motion
[16:11]
uh
roll call uh deb
[16:15]
mr defranco yes mrs jim blank yes mr
machelko yeah
[16:22]
emotions approved um
[16:26]
so um
let's see here are there any other so
[16:30]
that motion's approved
uh are there any other uh considerations
[16:34]
for the board
[16:38]
if not uh
motion to close
[16:43]
move to adjourn
adjourn
[16:46]
stable
they have 10 days to appeal so we're not
[16:49]
going to be able to issue a permit
in the next 10 days just because
[16:52]
somebody wants to appeal
right thank you so there are 10 days to
[16:57]
appeal so thank you
any other thoughts there
[17:03]
good
uh so i think i heard motion to adjourn
[17:07]
seconded all in favor
bye
[17:12]
very good eye as well so everybody have
a great day thank you thank you everyone
[17:16]
bye thanks everyone
great meeting