progress.
>> Hello everybody. I'm going to call the
[0:08]
uh September 3rd workshop meeting of
Burough Council to order and I'll lead
[0:15]
us in the pledge.
[0:21]
To the flag of the United States of
America and to the stands one nation
[0:28]
under God
and justice for all.
[0:37]
» President Bush
>> here.
[0:39]
» Vice President Ricks
>> here.
[0:41]
» Council member Samson
>> here.
[0:42]
» Council member Barack
>> here. Council member Spear
[0:45]
» here.
>> Council member Godini
[0:46]
» here.
>> Council member Stratton
[0:48]
» here. and Mayor Dana Edwards
>> here.
[0:51]
» Okay. Uh
[0:57]
I don't think I have any comments uh at
this time. I will note
[1:03]
that
[1:07]
we do have one consideration item. So I
think I will take um public comment
[1:13]
before we vote on that consideration
item.
[1:16]
Uh otherwise public comment will be at
the end of the meeting as it generally
[1:19]
is a workshop.
Okay. Um Mr. Mayor, do you have
[1:25]
comments?
>> No comments. Thank you.
[1:27]
» Okay. Uh so let's move on to the agenda.
Uh our first discussion item is the uh
[1:33]
bridge project update.
So let's begin with a a summary and then
[1:39]
we can see if there's a motion. Um but
right now
[1:44]
you want to give us our
sum of the situation.
[1:48]
» Yeah. And I want to also mention that we
have um Mo Gawe here. Uh he's with
[1:53]
traffic planning and design. Um so we
have him online. Uh he is our
[1:57]
construction manager uh for this
project. Um so what is before you
[2:02]
tonight is a consideration for some
options to uh alter the the bridge uh
[2:09]
project slightly. And this is because
the site access was originally intended
[2:14]
to be through the uh parking lot. Um
that access is not available at this
[2:20]
time and so we are pivoting to taking
access from the south side um of the
[2:25]
tracks which would result in us bringing
um um you machines and uh materials uh
[2:32]
on the tracks themselves as opposed to
coming in off of the right of way.
[2:38]
um because of the uh number of trips
that we would have to take um that does
[2:44]
increase the project cost. Um so we have
a couple of options ahead of us. Uh
[2:49]
these numbers so I produced a memo to
council a couple days ago as part of
[2:53]
your packets. Those numbers have been
revised. So we do have those available
[2:57]
um if we want to pull them up. Um and
actually we should probably because the
[3:02]
numbers are are different nominally but
they're different. Um so if we do
[3:09]
nothing to the bridge design, option one
would maintain the um existing
[3:13]
pedestrian access um would have the
two-phase bridge construction uh but it
[3:18]
would cost some additional money to um
potentially to the burrow and this is
[3:23]
going to be the
um
[3:26]
the ECMS.
[3:34]
So, while we're getting this up, I'll
just keep going through the the three
[3:37]
options.
Is it going to not show up because it's
[3:40]
in word? Yeah.
>> Okay. [clears throat] Sorry. I'm sorry.
[3:44]
Stand by. We have um
it's in Word, so it won't show up on our
[3:49]
screen.
>> Correct.
[3:58]
» Okay. My apologies. We'll just read out
the numbers then.
[4:01]
So option one
um this would maintain all of our
[4:06]
existing um design configurations and
timeline for the project. One of the
[4:10]
things that we want to mention is that
we do have an approved budget. This is a
[4:14]
fedally funded project but we have a
maximum approved budget for this. So any
[4:18]
costs above that budget uh would be
borne by the sponsor and the bureau is
[4:23]
the sponsor. So we uh would anticipate
then that we would be on the hook to pay
[4:28]
any additional funds above what the
project approval costs um have that have
[4:34]
been already approved. So option one um
in order to access the the construction
[4:39]
entrance um it would result in an an
additional estimated cost of $244,000.
[4:47]
This maintains the original completion
date of July 24th, 2029.
[4:51]
um because we did start looking at other
options uh beyond just that one. We did
[4:56]
come up with two others that are before
you this evening and I will give a brief
[5:00]
overview of them and then I'll turn it
over to Mo to to talk a little bit in
[5:03]
more detail about them. So option number
two would be to install a temporary
[5:07]
pedestrian bridge. Um this would be
about a million dollars worth of
[5:12]
construction cost to build the bridge.
What it does allow us to do though is
[5:16]
actually demo the bridge in a uh rebuild
the bridge in a single phase as opposed
[5:19]
to a two-phase. So, it eliminates that
construction seam in the middle of the
[5:22]
bridge. Um, that is, I'm told, a better
product overall for long-term
[5:26]
maintenance.
>> Sorry, sorry, I got feedback from people
[5:30]
on Zoom that the audio is garbled and
getting worse. Is there anything
[5:34]
different or is it the same?
>> Yeah, I don't know what we can do about
[5:38]
garbles.
>> Yeah, sorry. Sorry.
[5:42]
That usually has to do with the noise
like noise cancellation is on somehow
[5:46]
either with Zoom [clears throat] or the
um the
[5:51]
or the owl.
>> Yeah. Um
[5:54]
» sorry.
>> Yeah. I just
[5:59]
» It's all the same.
[6:03]
» Does it help if we speak up?
>> Yeah, we'll try speaking louder. But
[6:08]
» I do see the audio isn't jumping as much
as it normally does.
[6:13]
The little icon there.
>> I mean, short of me unplugging
[6:17]
everything. Um,
>> I don't We can try I don't want to
[6:23]
interrupt the meeting too much. I
understand that folks are having a hard
[6:25]
time hearing us online. Um, we can pause
for a few minutes and try to fix this or
[6:29]
give people an opportunity to come down.
[6:36]
What's what is council's pleasure here?
>> I do not think we pause the meeting. I
[6:40]
think we've got a lot going on.
>> Okay.
[6:43]
» I think we'd speak up and if if we can
identify a specific thing we can do
[6:48]
» to try that would be fine. But like
rebooting the whole setup is
[6:52]
» is it supposed to be red?
>> Yeah, that's the camera.
[6:55]
» Oh, that's No, no. On the owl itself
there's a Is that okay? So maybe we do
[7:01]
need to reboot the owl.
All
[7:05]
right. In that case, yes, let's read
with the [laughter]
[7:13]
Apologies to the folks in the room.
[snorts]
[7:20]
What is this connected to?
That's that.
[7:35]
This is very uncomfortably close to me.
[laughter]
[7:39]
The video is on. Oh, there we go.
>> Oh, there we go. It just went off.
[7:56]
a little tucked.
>> Sony online want to tell us
[8:02]
to see if it
>> I will note that there is a budget
[8:06]
proposal at some point to redo the audio
setup in here.
[8:10]
» Keep that in mind.
>> It's jumping.
[8:14]
» Okay. It seems like that's an
improvement. So, I think we're going to
[8:17]
proceed and hope that that fixes it.
Okay.
[8:20]
» Maggie, if you want to jump back into
the second option.
[8:23]
» Yeah. Where was I? So, option number two
is the pedestrian bridge. Um, the
[8:28]
pedestrian bridge does uh cost about a
million dollars. Um, there are cost
[8:33]
savings though on the back end because
it would save um about 7 months on the
[8:38]
schedule.
So, uh net cost for this one would be
[8:43]
about $700,000
and 7 months ahead of schedule and we
[8:47]
maintain pedestrian access through this
temporary pedestrian bridge. Uh but
[8:50]
again, because these additional costs
would likely be borne by us, that would
[8:56]
be $700,000 that we would need to budget
for uh for this construction project
[9:00]
that we don't currently have budgeted.
Option number three, um would eliminate
[9:08]
the pedestrian access. So this would be
no pedestrian bridge and we would do a
[9:12]
singlephase construction. So we would
terminate pedestrian access for the
[9:15]
duration of the construction project,
which is about 15 months. Um, the
[9:20]
benefit of this one is that it would
actually be a net savings of about
[9:24]
$270,000
to the overall project cost. Now, we
[9:28]
don't get that money back. This is
fedally funded. It just means that we
[9:31]
wouldn't spend any extra money of
burough funds. Um, and we anticipate
[9:35]
that this could wrap the project up
almost 11 months ahead of schedule with
[9:40]
an anticipated completion date of um,
September of 2028. So, this would
[9:46]
dramatically reduce the overall
construction timeline for this project,
[9:51]
but it would eliminate the pedestrian
access. So, those are the three options
[9:55]
before you. I'm going to turn it over to
Mo u Mo if you're online um to add in
[10:02]
any um additional details and then we'll
open it up to questions from council.
[10:09]
» Thanks, Maggie. Can everybody hear me?
Okay.
[10:11]
» Mhm. Yes. Thank you. I think so.
>> Yeah, Maggie summed it up perfectly. Um,
[10:15]
option one, um, you know, we have to
access from the Overbrook tracks, um,
[10:22]
and move equipment through that fourth
track up to the north side of the
[10:26]
bridge. There's no savings in time.
There is additional costs. Um, option
[10:31]
two, we would construct a temporary
pedestrian bridge. It would still need
[10:35]
to go through the design and approval
process um, with the contractor and
[10:39]
Penoni to make sure that it's it's going
to support pedestrians. We would also
[10:43]
need to coordinate with uh Pico Electric
and Comcast to uh transfer the utilities
[10:49]
onto the pedestrian bridge to allow us
to do the singlephase construction and
[10:54]
eliminate that construction joint. And
again, that would be um an overall
[10:58]
additional cost of over 700,000. It
would save 7 months on the schedule.
[11:03]
eliminating um option number three,
eliminating pedestrian bridge um seems
[11:08]
to be um the preferred method by you
know the contractor and and pendot would
[11:14]
would result in the overall savings. Um
we feel like we can you know try to
[11:22]
save you know 11 months of of time as
well.
[11:29]
Does anybody have any questions about
any of the three options that I can
[11:32]
answer for you?
>> Yeah. So, at this point, questions for
[11:36]
uh about the logistics would be
appropriate and then we can discuss
[11:39]
afterwards.
[11:43]
» Just a point of clarity because I I know
what you mean, but other folks might
[11:46]
not. When you said eliminate pedestrian
access, we're talking about for the
[11:49]
duration of construction.
>> That's correct.
[11:51]
» And there will be pedestrian access on
the bridge post construction.
[11:56]
» Yes. And we would actually be able to
reopen pedestrian access before the
[12:02]
bridge is fully open to vehicular
traffic as well. So this wouldn't
[12:05]
necessarily need to wait until the
project is fully completely done, all
[12:09]
elements of it. So the the deck, like
the bridge deck, the actual
[12:16]
paved portion of it, um could be open to
pedestrians while they finish some of
[12:22]
the freeze work and the utility
connections, things like that that
[12:27]
wouldn't impede pedestrian access, but
the bridge would not yet be open to uh
[12:30]
vehicles. So we would try to expedite
the pedestrian reopening as as much as
[12:35]
possible. Um but yes, this is just
eliminating pedestrian access just for
[12:40]
the period of construction which is
anticipated to be about 15 months.
[12:44]
» Yeah. And just and also just to to resum
up even though you already said it,
[12:48]
there were unforeseen circumstances that
we now have to respond to. And so our
[12:54]
options are keep on the main pass but
meaningfully increase what we need to
[12:59]
spend on that which has implications for
our CIP.
[13:02]
um try to maintain pedestrian access at
at a significant additional cost which
[13:08]
would also have to have implications for
a CIP or try to take a option that will
[13:15]
speed up the process. It will lose
access for that period of time. Um there
[13:20]
will be a net savings because of the
truncated um time frame.
[13:24]
» Correct.
>> Okay.
[13:25]
» Yep. Great summary.
>> So you say 15 months is the expected
[13:30]
duration of construction.
>> Yes. You mentioned that the pedestrian
[13:33]
access might open up earlier than 15
months or is 15 months inclusive of that
[13:37]
earlier in you know early.
>> Yeah, Mo, correct me if I'm wrong, but
[13:41]
the 15 months is the expedited opening
for pedestrians. Correct.
[13:47]
» Yeah. Yeah. We we would figure that by
the time we have the deck board and the
[13:52]
barriers installed and and working on
the architectural features, we should be
[13:56]
ready to allow pedestrians on the deck.
um
[14:02]
probably late June of 2028.
>> Um
[14:07]
» 20
>> that's assume that the contractor can
[14:09]
get the road paved and try to get us
back in a situation where we can at
[14:14]
least get them back on before it's open
to ve vehicular traffic.
[14:18]
» And when would the closure pedestrian
closure start? immediately or
[14:23]
» with that option, we said January of
2027
[14:28]
through about June of 2028.
[clears throat]
[14:34]
» Um, hi Mo, thanks for being here. by the
way. Um can I ask a question about
[14:37]
option three because again it's a
significantly earlier completion date um
[14:44]
which is very attractive and I know one
of the issues is certainly the concern
[14:47]
of neighbors adjacent to the bridge that
are going to hear a significant amount
[14:52]
of work happen at night. Does that that
new date in option three alleviate some
[14:58]
of that night work by agents?
Um, I would say the night work probably
[15:04]
stays close to the same, if not a little
bit less, because now, um, we're
[15:09]
basically consolidating instead of
having to do the two stages of of the
[15:12]
excavation on the bridge and having to
set the bridge beams in two different
[15:17]
phases, we would be consolidating those
uh activities into a single operation.
[15:23]
Um, so yeah, I guess you would could you
could say that um like towards the
[15:27]
middle of the project and definitely
towards the end we would be saving um I
[15:32]
guess some of the there would be some
relief with the night work.
[15:44]
» No, I think we're still on questions for
>> I have a question.
[15:46]
» Go ahead. Um you mentioned that the
doing the bridge in a singlephase
[15:53]
construction would result in a
structurally uh better bridge and
[15:59]
potentially
lower cost maintenance over over time.
[16:03]
Can you go into detail um
>> about that and what what the the cost
[16:09]
difference might be long term for
maintenance?
[16:13]
Well, when when you introduce a
construction joint where we have it
[16:17]
currently designed, you have a bigger
potential of a failure point and and
[16:21]
more um more of a maintenance concern.
When you eliminate the construction
[16:26]
joint and you or the deck and the
abupments in a single pore, um you
[16:33]
reduce that risk long term.
[16:38]
You you you eliminate the failure point.
Do you have a sense of what the
[16:43]
maintenance cost difference over the
long term might be between a singlephase
[16:48]
bridge project and a
a two-phase bridge project with the
[16:54]
seam?
[16:57]
» You mean in terms of maintenance?
>> Yeah, in terms of long-term maintenance
[17:01]
costs.
Um, I I don't have the figures on how
[17:06]
much savings it would cost for long-term
maintenance, but I would imagine it
[17:10]
would definitely, you know, longterm it
it would in terms of bridge inspections
[17:15]
and having to come back and possibly
address future failure points and
[17:18]
concerns. It would, you know, there
would be time basically that that you'd
[17:22]
be saving and any shutdowns of the
bridge that you would have to do to to
[17:26]
address those concerns. Um, but as far
as a dollar amount, I don't have that.
[17:31]
Well, but I can I can look into it for
you.
[17:34]
» And Jean, along with that as well, just
in terms of local maintenance, just the
[17:38]
snow plow operations, having the
smoother road versus the seam road just
[17:42]
for um salting and plowing operations
would be uh just easier and less uh less
[17:49]
concern. Um but obviously the bridge was
designed in a two-phase, so we are
[17:54]
committed to building it that way.
However, if we have the option to pivot,
[17:58]
um, then that is a benefit to option two
or three.
[18:03]
» If if we make these changes, do we have
to go through all of the cycle of
[18:08]
approvals that we had to go through?
Cuz, you know, those took so long.
[18:14]
Like I'm just hesitant about these time
frames. Are they taking into account
[18:19]
whether and to what extent we need to
get approvals from Comcast, Verizon,
[18:24]
Pico, Amtrak, SEPTA, and all the other
all the other folks that we need to get
[18:30]
approvals for the initial construction.
>> You have you have you have more levels
[18:34]
of approval with the pedestrian bridge
than you would for eliminating
[18:38]
pedestrian access. the had not been made
aware that, you know, we could if we
[18:44]
build we eliminate the pedestrian
access, you know, they cuz the site's
[18:48]
currently not ADA compliant, they would
approve that change. It seems like they
[18:54]
would approve that change pretty pretty
quickly. Things in construction tend to
[18:58]
get approved a lot quicker than during
the the traditional design process and
[19:02]
trying to get it out to bid. When we're
in construction, we can we can make
[19:05]
things happen a little bit faster.
[clears throat]
[19:08]
» Okay. Thanks.
>> Is it correct to say that um the
[19:14]
construction project is waiting on this
decision right now that we are not
[19:18]
proceeding because this decision needs
to be made?
[19:22]
» That that would be correct. Um if we
would go with pedestrian bridge option,
[19:26]
we would need to know sooner rather than
later so the contractor can submit their
[19:30]
plans and submit their um designs for
approval. get there will be some
[19:35]
fabrication and and lead times with
associated with that. Um doing the
[19:42]
elimination of the pedestrian bridge um
would allow the contractor then to um
[19:47]
complete their designs for excavation
support in one stage rather than having
[19:54]
to try to um figure out, you know, to a
second stage um excavation support. and
[20:01]
also submitting the
beam placement plan. We can do that all
[20:07]
in one shot now versus having to do a
peace meal.
[20:11]
» Okay.
>> Anybody else have some questions for
[20:14]
him?
>> Just one clarification. Uh if um we were
[20:19]
talking about 15 months without
pedestrian access, when I count from
[20:23]
January 27 to June 28, I get 17 months.
Uh just want to make sure I'm counting
[20:30]
correctly.
[20:34]
» I mean to go from June 1st to
these were estimated they estimate.
[20:40]
» I just want to make sure we're that
people listening. No, [clears throat]
[20:47]
» it is 15 or 17
but but it's it's in that range. Sounds
[20:52]
like it's 16 plus minus. It would be
about 16 months is what we were told by
[20:56]
the contractor.
>> 16.
[20:58]
» Okay. 16 months.
>> Thank you.
[21:00]
» Sorry, maybe I missed it because it's
getting a little loud in here. But that
[21:05]
you say this is going to have to be
submitted for some kind of approval. If
[21:09]
we approve a design change, not design
change, but a, you know, construction
[21:14]
change.
any like is there any peril with that
[21:19]
that it it gets caught up in like a
delayed approval
[21:24]
again like what um what's your sense of
whether that could get caught up in
[21:29]
somebody's desk for you know 6 months or
more it
[21:33]
» I don't know that that's going to happen
uh we've been talking about this um now
[21:37]
for the past few weeks I'd say for at
least a month Maggie with the value
[21:42]
engineering and and when we started
discussing the elimination of pedestrian
[21:45]
access. Everybody on the project team
seemed to, you know, ready to do what it
[21:51]
takes to get that plan approved. Um
there would have to be, you know, some
[21:56]
modifications to the structural plans,
but we could work through that in the
[22:00]
interim before um before we get to that
point. It's the these changes are, you
[22:06]
know, would be field changes
essentially. Um and it could happen a
[22:11]
lot quicker than having to go through
the the design process, you know, before
[22:15]
going out to bed.
>> Yeah, I think we're not worried so much
[22:19]
about the contractors as about all the
state agencies and all the uh you know,
[22:23]
Amtrak and the [snorts] Conrailman and
all of that.
[22:28]
» Amtrak's been committed to helping the
project, you know, get access through
[22:32]
their through their yard um down by the
Overbrook Station to allow us to use
[22:37]
their tracks. Um, now obviously there's
there could always be hiccups along the
[22:41]
way, but they they have been committed
to making sure that we um complete this
[22:46]
project as as as quickly as we can if we
do this modification to the contract.
[22:51]
» Okay. Has your company done a project
like this before bringing in materials
[22:56]
on the tracks
like this?
[23:01]
» Um, my company TP, no. Um, but the
contractor has, you know, experience
[23:06]
with, uh, railroads agencies and and
SEPTA and Amtrak and they have the the
[23:11]
connections there and and and have the
equipment to be able to access uh, the
[23:16]
tracks and and bring their equipment and
materials into where we need it to be
[23:19]
and uh, move quickly and efficiently.
>> I'll point out that all three plants, I
[23:24]
think, have the equipment coming in
through the rail, right? So, those are
[23:28]
that that is a a a change that we'll
have to
[23:31]
» Yeah. regardless of the options that we
choose because of the access we will
[23:35]
have to bring in everything on the on
the rails. Um and and uh Joe to your
[23:40]
question earlier um I I'm referencing my
notes. So our previous discussions with
[23:47]
the contractor again these are estimated
timelines.
[23:50]
If we proceed with no pedestrian bridge
we're thinking January 2027 through
[23:54]
April 2028 not June. My apologies. Um if
we do the pedestrian bridge option two,
[24:01]
then we would be looking at uh
demolition
[24:04]
um starting about May 2027 through
August 2028. Again, rough timelines.
[24:10]
» Totally understood. Great. So January
27th through April 28. There we go.
[24:14]
Thanks.
[clears throat]
[24:18]
» Estimated timelines.
>> Estimated timelines.
[24:20]
» Estimated. Yeah.
>> Yep.
[24:21]
» All right. Uh, thank you, Mo. If you
don't mind sticking around uh for a few
[24:24]
minutes in case we have more questions
while we're discussing this, that would
[24:27]
be very helpful.
>> Okay, council members,
[24:34]
Mr. Mayor, anybody have thoughts they
want to
[24:37]
» I guess I'll I've expressed some
concerns already about this. Um
[24:43]
um I guess
my concern about deciding tonight is
[24:48]
that I feel like we have not complete
information and that's based on my view
[24:54]
that it's not clear to me who bears the
risk of
[25:01]
uh loss contractually for the
misapprehension in terms of what the
[25:08]
access for this project would look like.
uh I tried to look at the contracts
[25:12]
today. I really don't feel comfortable
making the determination that these
[25:18]
costs would fall in the burrow as
opposed to contractor based on um where
[25:24]
those risk of loss provisions are. And
so it's
[25:29]
um
I guess I I feel like I
[25:34]
I and I recognize what President Bush
said about you know if we wait it's
[25:38]
means that they can't start but I feel
like in the next two weeks we could get
[25:42]
an opinion from our solicitor as to to
ensure that these costs would actually
[25:48]
be fall on the bureau and not the
contractor or some other third party. I
[25:53]
know the state has said that it's not on
them. Um, but I do have real concerns
[25:58]
about making decisions [snorts] largely
I think on these cost considerations
[26:04]
when we're not even sure that those cost
considerations are accurate in terms of
[26:09]
whether they would fall in the burrow or
not. Having said that, I you know my own
[26:14]
view is if if these are accurate, I
think option three um is the obvious
[26:20]
choice here. As much as I would love to
keep the pedestrian access
[26:26]
uh going, you know, we bicyclists can
get under the bridge, I do have some
[26:31]
concerns about accessibility and we
pride ourselves on being a burough for
[26:35]
all. I don't know whether we can come up
with some sort of ability to transport
[26:43]
people from the southside who are
wheelchair bound or otherwise limited in
[26:48]
their ability to get underneath the
tunnel. Um whether that's getting share
[26:53]
rides from the police force or something
else. But I think we have to consider
[26:56]
that if we're going to eliminate
pedestrian access over the bridge
[27:01]
because we can't cut off a third of our
population. some people who might have
[27:06]
accessibility issues. Um, so I think I
think
[27:09]
» Yeah. So I think we have to, you know,
put that into consideration if we're
[27:13]
going to adopt option three.
>> Okay. So you're you're concerned about
[27:18]
the contract. Like I don't think there
is a way that we could get option two
[27:23]
paid for by the contractor. Like I it
looks [clears throat] like if if if we
[27:27]
somehow manage to um you know persuade a
judge that uh well I think potentially
[27:34]
your argument applies to option one
right that the fees option one which is
[27:37]
not a design change. I don't think we
could force a contractor to change their
[27:41]
design and pay extra out of their
>> No. I Well, and I think option my sense
[27:46]
is option two isn't really a
consideration
[27:49]
» among any of us, right? I mean, it
doesn't necessarily make sense
[27:53]
regardless. So, it's really just
evaluating option one versus option
[27:56]
three. I agree with that.
>> Okay. We'll leave that in mind. other
[28:00]
council members.
>> Are we going around or
[28:03]
» Well, people feel that we can go around.
Do you want to go?
[28:08]
» Sure. Yeah. I mean, it would be painful
to eliminate the continuous pedestrian
[28:12]
access since we that was one of our
specificifications, you know,
[28:16]
originally. Um although to be fair with
that it wasn't apparent until very late
[28:24]
in the game then that that maintaining
pedestrian access would bear
[28:29]
a higher time frame. remember that it
was kind of we were not
[28:33]
» confirmed. They were definitely there
was a tradeoff and it appeared that we
[28:38]
couldn't do anything about it at that
time. You know that it just wasn't a
[28:41]
consideration anymore about you know we
were kind of stuck with our previous
[28:45]
decision to maintain pedestrian access.
But now it looks like we have the
[28:48]
opportunity to revisit that with not
only cost savings but time savings which
[28:53]
is you know it's still not the best
thing but I agree probably probably it's
[29:00]
the way to go under the circumstances as
option three which eliminates pedestrian
[29:05]
access for 15ish months. I like the idea
that we come up with some kind of
[29:10]
shuttle or something for people who I
mean there must be people who approach
[29:15]
even to use the the train station who
need to get to the other side that can't
[29:20]
use the the stairs who you know have to
go over the bridge at this point. I
[29:24]
don't know how many people that is.
>> Yeah. I mean, we we have the numbers for
[29:30]
how many people use the bridge as a
pedestrian or as a bicyclist, but it
[29:35]
doesn't say whether they're impaired in
any way. So, you know, it could be two
[29:39]
people a day. It could be 20. Who knows?
I I don't think it's that significant,
[29:44]
but I do think we should at least if
we're going to adopt
[29:49]
number three, I I feel pretty strongly
that we should come up with some sort of
[29:53]
whether it's through public health and
safety or some sort of
[29:57]
» plan to ensure access for those who
won't be able to walk under the tunnel.
[30:04]
I guess.
>> So, I've had the same discussions,
[30:09]
obvious concerns about the pedestrian
accessibility, mobility impaired, um,
[30:14]
and bicyclists. And it it's a long time.
Um, at the same time, like when you're
[30:21]
weighing uh when how quickly the how
many months we're going to save 11
[30:28]
months, that's a significant length of
time. Um there's also the benefit of uh
[30:34]
the the structurally stronger stronger
bridge and there's the cost. Um and so
[30:42]
Maggie I talked to you about whether it
would be possible to work with SEPTA to
[30:48]
see if we can install some sort of
temporary bike ramp um in the pedestrian
[30:53]
tunnel at that station. Um, I've I've
also seen kind of these uh handicap
[31:01]
accessible ramps, the ADA accessible
ramps. Um, and I think I've seen them at
[31:07]
museums where they have old
infrastructure where you can fold them
[31:12]
away or you can blow them out. So I
would definitely like to explore what we
[31:17]
can do at that pedestrian tunnel to see
if we can provide for that access for
[31:23]
for both mobility impaired people and
for crisis folks.
[31:27]
» And just to touch on that, so I did um
start reaching out to some folks at
[31:32]
SEPTA just to get some sense of that. So
haven't yet gotten through to the person
[31:37]
I need to talk to. Um but
uh the the fora has been made to get
[31:46]
some information there. Um and then our
engineer is also going to be taking a
[31:50]
look um to see
if it would even be kind of technically
[31:56]
feasible to put in, you know, ramps
because SEPTA is not a partner in this
[32:02]
project. So they aren't actually part of
the the scope here. So [snorts] to bring
[32:06]
in another agency um as part of the
official project scope could be
[32:12]
problematic. Um but if there's a way
that we could work with them kind of as
[32:17]
a one-off. Um but we are taking a look
at the the actual design of the the
[32:22]
tunnel to see if it would be technically
feasible because you have to have
[32:25]
certain
>> clearances and the tunnel is pretty
[32:29]
» short and narrow and it's deep. So the
height I don't see. So the the the the
[32:35]
slope that you need to get because of
how steep the stairs are and the height
[32:40]
of the tunnel, it might not be possible
because it's just technically
[32:43]
infeasible. But we are looking into it
to try to exhaust all of our
[32:47]
possibilities.
[32:52]
» That was my question. It looks like the
the Zoom is down.
[32:55]
» Yeah, we lost the internet.
>> Okay,
[32:57]
» let's pause for a second.
>> Backup is roll.
[33:01]
Okay. Nonetheless, it goes right.
>> Yeah.
[33:07]
» So, we're just going to wait a second.
See if we can get back online
[33:12]
in a prompt fashion.
>> Good news is the audio seems to be
[33:17]
fixed. [laughter]
[33:21]
» In order to save the audio, it was
necessary to destroy it. Yeah. Okay.
[33:24]
[snorts]
[33:30]
And we are also looking into different
>> internet service provider as well. So
[33:44]
[clears throat]
[33:51]
» how long ago did that go down? I
listening. [clears throat]
[33:53]
» It just
>> It just did.
[33:56]
I think that we're be having a whole
long conversation.
[33:59]
» Yeah.
>> Recording in progress.
[34:01]
» Okay.
>> Back in
[34:04]
» sound.
[34:10]
The recording and the Zoom are two
different things.
[34:15]
» Still got to get the audio the video.
>> Yeah, we're in. I'm just
[34:20]
» Okay. So, we're live again. All right.
Thanks. Uh, we are proceeding. Uh, we
[34:24]
paused while the technical difficulties
were going, so we're proceeding again.
[34:28]
Michael,
>> yeah, I guess I had a lot of similar
[34:30]
questions like about, you know, the ramp
and and other things of that nature. Um
[34:35]
the
I mean it's this is obviously really
[34:40]
tough cuz no one wants to like we know
we have residents that have mobility
[34:44]
issues on the southside and no one wants
to be put in the position of having to
[34:49]
take that offline for a period of time
but the the just the totality of the
[34:54]
information set that we're dealing with
um
[34:58]
does predispose me to to option three.
Um the I'm not sure the um I'm not a
[35:06]
lawyer, but I'm not sure that kind of
like trying to to to
[35:11]
have Walco spend time jocking with the
contractor and putting us in like an
[35:16]
adversarial stance for a couple weeks
makes total sense to me individually. Um
[35:24]
the and then I also thought there's like
time sensitivity to this. So if we don't
[35:29]
take action, we're effectively taking a
action, right? So if we if we take no
[35:33]
action, we are choosing option one. Is
that correct?
[35:39]
» Yes, option one is happening more or
less without
[35:44]
anyone taking proactive decision making
because that is the way that this
[35:49]
project can proceed.
>> Sure. So So we do not we are making a
[35:54]
request of the contractor. We are not
telling the contractor what to do. The
[35:58]
contractor has a lot of power to make
this project happen according to the
[36:03]
terms that they signed.
>> Right. So,
[36:06]
» but I just wanted to clarify that like
contractor is actually
[36:10]
» if we don't make a choice ultimately the
contractor will make a choice.
[36:13]
» Right. Right.
>> So, yeah, just with
[36:16]
» and that choice will be number one.
>> Yeah. So, I spent a lot of time kind of
[36:20]
thinking through those different pieces.
And I don't, you know, I don't feel
[36:26]
particularly great about uh removing the
the pedestrian multimodal access for
[36:31]
that period of time, but just the
totality of all these items predisposes
[36:36]
me to options, right?
>> We we didn't even talk about that end of
[36:40]
the street. you know, actually opening
it up much earlier solves the end of
[36:47]
Havford health and safety issue, you
know, which is really significant. We
[36:52]
haven't even mentioned that, but that's
actually a collateral benefit.
[36:56]
» So, I would say regardless of
checking on the contract and the
[37:00]
numbers, I would still pick option
three. I don't need to repeat all the
[37:03]
concerns that you say, but um I actually
have confidence that our our neighbors
[37:09]
will show up and there will be a
communitydriven shuttle organized by our
[37:14]
residents, you know, in collaboration
with the burrow because we all care
[37:17]
about getting our neighbors the
accessibility that they need. So, I
[37:20]
support option three.
[37:24]
» Excuse me. I agree with option three as
well. um agree with the concerns that
[37:27]
have been brought up and and the reasons
why um option three seems like the the
[37:31]
best of the options available at this
time.
[37:36]
» I'm full support for option three. Um
there's a note in here about admin staff
[37:43]
basically having the same amount of
workload. Am I reading that right? I'm
[37:46]
I'm wondering if I'm wondering if
there's additional workload for you all
[37:50]
because like maybe the communications
are higher at the start and questions
[37:54]
and whatever else they're going to do.
Obviously, if we do pivot on the design
[38:01]
of the plan um and um eliminating the
pedestrian access, so if we proceed with
[38:07]
option three, then yes, we will want to
certainly message this to the community
[38:12]
um to ensure that everyone understands
what decision has been made, why it's
[38:16]
been made, and the impacts that this
will have. Um but we we would be
[38:21]
messaging and communicating any
construction activities regardless. So,
[38:26]
this may add some additional work kind
of upfront with the initial kind of
[38:30]
change and and getting that word out.
Um, but I don't foresee that uh that
[38:37]
this would create enough of an
administrative burden that we would
[38:42]
recommend against it.
[38:45]
» Yeah, I'm also generally in favor of
option three. I think that the the
[38:50]
amount of time saved
for the project is just so so large that
[38:56]
it is,
you know, in addition to the the the
[39:01]
cost savings, it's hard. I mean, I value
the pedestrian access and the bicycle
[39:06]
access. I think it is important, but
you know, there are about 10 times as
[39:11]
many cars using that bridge as
pedestrians on a general day. So, we
[39:15]
have to weigh both of these factors.
[39:20]
I'm not happy about having to make this
decision, but I think that that is the
[39:24]
right decision. Um,
moving ahead with option three.
[39:29]
» I'm not convinced we wouldn't have made
that decision to begin with.
[39:33]
» If it had been offered to us when we
were designing this bridge, we would
[39:37]
have had the same qualms, but ultimately
I think we would have
[39:41]
» we may well have made that choice.
Can I ask um if we express our
[39:47]
preference for a change for option 3U uh
will the contract change with with the
[39:54]
contractor will or will they still be
held to the July 2029 completion date?
[40:02]
» So the project agreement has the July
2029 as the ultimate project completion
[40:07]
date um regardless of this pivot. Uh Mo,
do we have you back
[40:13]
» here?
>> Yeah. Yeah, I'm here.
[40:15]
» Um could
>> you need to speak up a little? We can't
[40:16]
I couldn't I could barely hear what you
said there.
[40:18]
» Uh could you speak to could you speak to
the question about any any impacts this
[40:22]
would have on the uh contract?
Um, I think, you know, we we kind of
[40:28]
hold the power here that if we wanted to
do a time reduction and hold the
[40:32]
contractor to this new date, um, we
would we can have that conversation with
[40:38]
PennDOT and and the contractor to
incentivize them to, you know, maintain
[40:43]
it. Um, that's one option or, you know,
it's certainly a conversation we can
[40:49]
have with them.
Yeah, I I I had expressed that to Fred
[40:53]
that, you know, if we're buying if what
we're getting in exchange for this is an
[40:57]
accelerated time frame, I do want to
make sure that there are incentives
[41:01]
built into any contract addended that
says if they don't make those time
[41:05]
frames, you know, there's some
disincentives for them penalties, delay
[41:09]
penalties, etc. because it would be
terrible to buy this on the assumption
[41:13]
that we're getting accelerated time
frame and then we don't get it and
[41:17]
there's no [laughter]
there's no recourse for that. So I would
[41:22]
definitely want to make sure that
there's some contractual incentives
[41:26]
slash disincentives to stick to these
anticipated time frames.
[41:34]
» We we can we can I guess talk about that
Maggie. Um
[41:38]
the the one thing I'll mention just for
transparency is you know we can we can
[41:42]
do a time reduction and and hold the
contractor to liquidated damages with
[41:47]
the new completion date. Um that's where
we're going to go. Um the contractor
[41:51]
will still have um I guess there are
delays due to utilities for example that
[41:58]
hold up that that could potentially add
time but not significant amount of time
[42:02]
compared to the 11 months that we're
saving.
[42:04]
» Yeah.
All right. So, we did not have a public
[42:08]
comment period at the beginning of this
meeting. We are coming close to taking
[42:11]
an action here. So, I will at this point
allow public comment on this one issue.
[42:16]
Um, so if anybody in the room wishes to
make a public comment on this issue on
[42:20]
the the change to the bridge contract,
please let me know. And u Okay, don't
[42:26]
see anybody in the room. Does anybody
online wish to make a public comment
[42:29]
specifically about this bridge?
If so, uh, please raise your hand.
[42:37]
Okay. I
don't see anybody online who wishes to
[42:42]
make a public comment. Okay.
[clears throat]
[42:44]
So, at this point, what they are looking
for is a request to change the contract.
[42:52]
» I'm not sure if it's a request to change
the contract, but a request to amend the
[42:56]
the scope. And then this would allow us
to proceed with um negotiating with all
[43:02]
of the project partners including
PennDOT, Amtrak, the contractor, TPD,
[43:07]
and the burrow um to proceed with
whatever changes we need to make uh to
[43:13]
effectuate the change to pivot to the
design scope from option three.
[43:18]
» Okay.
>> I move to do that. [laughter]
[43:23]
» Second.
>> Second.
[43:24]
» Second.
>> All right. Any further discussion? All
[43:26]
right. I will I will point out that we
recognize this is the first time the
[43:30]
public is hearing about this and
ordinarily I think we would like to give
[43:37]
residents more time to weigh in on
matters like this but as we said earlier
[43:42]
this decision right now is slowing down
the bridge construction. So we feel as a
[43:46]
council that it is important for us to
take action even without taking as much
[43:51]
time to get public feedback as we
usually would because this project is
[43:55]
too important. So ultimately
if you feel like you're you know you are
[44:00]
not being able to be heard on this we
apologize but this uh time is of the
[44:05]
essence here. So
with that in mind uh the proposal is to
[44:11]
has just been enumerated to uh work with
option number three as stated in in the
[44:18]
memo. All those in favor?
Okay. So
[44:24]
so directed.
>> Okay. Okay,
[44:26]
» thanks a lot for being here.
>> Thank you.
[44:29]
» Thank you.
>> Appreciate it.
[44:32]
» All right. [laughter]
Next item is um 201.
[44:38]
So
uh first of all we have um received a
[44:44]
proposal for uh adaptive reuse of the
property um from Refugeia and the
[44:50]
founder of Refugeia is here to uh
um do you want should we summarize the
[44:58]
proposal?
Okay Jeff, why don't you take a a few
[45:02]
minutes introduce yourself and and uh
walk us through your proposal. The
[45:06]
proposal is in the packet. Um, and uh,
yeah, go ahead. Make sure to speak up.
[45:13]
So,
>> sure.
[45:15]
» Good evening. Uh, my name is Jeff Ren. I
am the founder of Fugia Design. We're an
[45:19]
ecological landscape design build.
>> Can tell you have to speak up a bit or
[45:23]
come close.
>> Yeah, maybe if you want to
[45:26]
» or we'll move a mic near you.
>> You want to come over here?
[45:31]
» No, there's one right there. Just come
up a little bit next to Chief Strings
[45:34]
mic. Thank you. All right, there you go.
>> Is that better?
[45:38]
» Hopefully.
>> Hopefully. Okay. Um and um I live also
[45:42]
on I'm a resident of Narbirth. I live on
Lance Twin Lane and we are currently uh
[45:48]
we have our place of operations in the
Price House on Meeting House and
[45:53]
Montgomery Avenue. Um so we've been
looking for um uh an alternate location
[46:00]
to potentially move our business. I
would love to keep the business in
[46:04]
Narbirth. Uh as we know there are very
like limited uh [clears throat]
[46:09]
properties that may offer some [snorts]
of the uh the spatial requirements that
[46:14]
we need. Um and also our current place
of business is up for sale. Um and it
[46:20]
doesn't entirely work for us. We're
making it work. It doesn't entirely
[46:24]
work. So started looking for options and
I said so I kind of want to say first
[46:29]
and foremost I'm presenting also looking
for is this feasible that our needs and
[46:38]
what Seabine has to offer might like
match or they might not. Um because we
[46:44]
would need some parking lot space. Um
there's definitely an indoor space that
[46:49]
we could utilize for a design studio,
but the outdoor space we will need
[46:53]
functional uh parking lot space um which
I have illustrated in in uh this
[47:00]
presentation, but also maybe it's just
the entrepreneurial brain in me and also
[47:06]
um just living in the community kind of
always searching for catalysts to kind
[47:11]
of kind of um break the ice uh a little
bit for for our town to uh to to see
[47:18]
some of our potential
um uh and to ignite some community
[47:24]
uh [clears throat] spark, if you will. I
think the Sine Property offers that. Um
[47:31]
uh or potentially offers that. Um, so
I've put together
[47:36]
um
a presentation that has like kind of a a
[47:40]
potential new footprint that we're
thinking about for the property that
[47:45]
shows place of operations for us and
also some of the potential adaptive
[47:51]
reuse for the space that's currently
available that is not um the daycare,
[47:57]
the wonders, which is the they they take
up the bulk of the twotory
[48:03]
section of of the property. Um but
currently um [clears throat] most of the
[48:09]
rest of the property is um either
occupied by Lavner camps although they
[48:15]
no longer and Maggie maybe you could
correct me if I'm wrong. I'm not sure
[48:19]
where they are in their lease like
they're they have a lease but they're
[48:23]
not occupying space. Is that correct?
>> The lavender.
[48:27]
» Yeah. Sorry. Yeah. Okay.
Um so this kind of illustrates you'll
[48:32]
see um the parking lot space in the back
um an area that's currently um Lavender
[48:41]
Camps, one of their office spaces
highlighted in yellow there. And then we
[48:45]
were looking at the cafeteria space
which is in orange as this kind of great
[48:50]
glass in kind of mid-century
public school room that could be great
[48:56]
community event space. Um, and there's
also the old um, principal's office,
[49:00]
which is in highlighted in purple there,
which is already kind of divvied up into
[49:05]
these really kind of oddly shaped rooms
and hallways. Um, that actually would
[49:09]
work quite well for um, artist studios
or maker studios. So, it just got my
[49:15]
brain started kind of cranking on this
and thinking about, well, what are some
[49:19]
other things that could potentially be
done um to the [clears throat] property
[49:23]
in addition to us being potential
long-term tenants, which we would love
[49:27]
to explore the auction. Um, in addition,
one of the first things that we noticed
[49:34]
when we kind of tour the property is
that the parking lot is massive. I think
[49:41]
it takes up almost an acre.
>> [clears throat]
[49:43]
» Um, and it has like a few really puny
storm water drains in it. So, it's
[49:49]
definitely it has uh a lot of storm
water problems. Um, and the idea of
[49:58]
thinking about more of an ecological
campus potentially for the state vine
[50:03]
property would allow us to address
um upgrades to the property in an
[50:10]
ecologically focused manner that could
also be a way that we we use it almost
[50:14]
as like a display landscape. Something
that can still it remains functional for
[50:20]
the public. Uh it allows us to run our
business out of this space, but also it
[50:27]
allows us to use it as a sync
potentially for um MS4 credits, which
[50:32]
are being updated this year in draft
form. They're focusing less on
[50:36]
pollutants and more on volume, which is
a huge difference for the for for
[50:42]
burough consideration and storm water
management. And it's a huge upgrade
[50:45]
because a lot of the work that we do as
a as a business is dealing with volume
[50:50]
of storm water. It's less about
pollutants, more about volume. Um so I
[50:56]
have highlighted Maggie, I don't know if
you could go just to to show some of the
[51:01]
um inspiration photos. This
>> is that in the same document.
[51:06]
» It is. So all if you just kind of
continue to scroll.
[51:12]
So this well actually this would zoom in
to kind of show more of like the
[51:17]
footprint that we'd be
looking to have in the back side of the
[51:22]
parking lot. So um currently there are
there's a lot of open spaces. Some
[51:29]
people rent spaces for like RVs or work
trucks. There's um some space for um a
[51:35]
little a community garden. I think some
of the plots are being used. A lot of
[51:40]
them aren't anymore. who are looking at
an option to kind of bring them out into
[51:44]
a more accessible space. Um, but our
plan would would allow for there to
[51:49]
still be 47 available
spots for the public and we would take
[51:55]
24 of them during weekdays
and they would be back in use for the
[52:03]
for the public at night and on weekends.
So, it's a total of 71 spaces would
[52:07]
still be available. Um, and we're just
really kind of, and maybe I'm kind of
[52:11]
like ping ponging back and forth here a
little bit, but the idea is like how can
[52:15]
we how can we connect this space? How
can we adaptively reuse the public
[52:22]
school connected to the park so that the
park becomes a more utilized park. Um,
[52:30]
by by thinking about this as more of
like a campus that can be community
[52:33]
focused, it allows us to start thinking
about how we can connect the green space
[52:39]
and the buildings in a way that they
become
[52:43]
uh, you know, more used by the public in
a way that I I don't know has been
[52:48]
explored quite in this in this way
before. Um, and still offers revenue
[52:54]
opportunities for the burrow. Um
[clears throat]
[52:59]
um if you could scroll down.
[53:06]
Our business isn't new to working in
public spaces. So these are just some
[53:11]
kind of inspiration photos from work
that we did at the Media Upper Proidence
[53:17]
Public Library. And this is a a
demonstration storm water management
[53:22]
system that we put outside of a barren
landscape on the on the side of the uh
[53:28]
on the side of the library which was it
had um just they post construction a
[53:34]
bunch of lawn and highly compacted soils
and nobody used it, no one walked near
[53:40]
it. Um, so we we took the opportunity to
create an educational space in there
[53:45]
that also functioned as a storm water
management system. And the same type of
[53:49]
potential that we did here could be
[clears throat] done at Safeine. Um,
[53:54]
I've been speaking extensively with
Moren McGee from the Lower Marine
[53:59]
Conservancy. They're very interested in
in getting involved in a project like
[54:05]
this where they could help fund and and
help tackle the storm water issues in
[54:11]
place and also create educ an
educational landscape and something
[54:16]
that's also a functional landscape. Um
so these are just some inspiration
[54:22]
photos to kind of show how we can kind
of reimagine that space. Um, and also
[54:27]
think about the flow of traffic through
that space as something that feels far
[54:30]
more immersive, something that invites
you into the property rather than just
[54:33]
walking by it. Um, and brings people
into the park.
[54:38]
Um, if you don't mind scrolling a little
further, you'll see how like zoom out a
[54:45]
little bit. It really becomes even we
even took care of like putting plants
[54:49]
into the hellst strip along the
sidewalk. So, you're you're kind of
[54:53]
drawn into the space. Um, and there's a
uh the media school is like just a few
[54:59]
blocks down. So, kids travel down the
street to get to school and they all cut
[55:04]
through and go through the landscape to
get there, which is really cool. That
[55:07]
was the intention. Um, if you don't mind
continuing to scroll. Um,
[55:14]
I like the idea of thinking about this
potentially and maybe thinking about it
[55:18]
because it's a school like thinking
about a campus, but um, this is a
[55:23]
picture of Evergreen Brick Works, which
is a um, it's a former factory that was
[55:28]
converted into an environmental center
in Toronto, Canada. They do a lot of
[55:33]
community programming. Um, and they were
able to kind of take this like desolate
[55:39]
space. I think it also had like a
functional um, quarry on it and they do
[55:44]
lots of um, community- based programming
in it. And if you go onto their website,
[55:50]
there is links that I shared in the
presentation so you can go in and and
[55:56]
learn more about them as an
organization. But they they facilitate a
[55:59]
lot of community planning. Um, they're a
really cool organization, but I just
[56:04]
like the way that they kind of present
themselves, and I like, if you can, you
[56:07]
can see before and after pictures on
their website. And we were also inspired
[56:12]
by the Bach building in downtown
Philadelphia. It's a form of occasional
[56:17]
high school that has been converted into
like artist studios. I think there's I'm
[56:22]
not suggesting that we have like some
people know it's popular for a bar. Not
[56:27]
considering the bar part of this, but it
is used for um community space. There's
[56:32]
a there's a music venue inside of there
or performance venue. There's artist
[56:36]
studios. A lot of this infrastructure
already exists in the school. Mhm.
[56:42]
[clears throat]
>> Um and the other thing that we wanted to
[56:45]
acknowledge is that we understand that
this is um you know, one of the reasons
[56:50]
that there's there's been a lot of
conversation about different uses for
[56:55]
this property has to do with um that
it's not really much of revenue
[56:59]
generator right now and there's a lot of
deferred maintenance. So, um I'm not an
[57:04]
expert at print right now, but thought
about this through the lens of okay, how
[57:09]
can we think about the potential for
something like this and also not
[57:15]
overlook the challenge of funding
something like this. So, if you don't
[57:21]
mind scrolling up a little further.
[57:26]
Oh, oh, I should mention too, so in the
parking lot, sorry, forgot about this.
[57:30]
Um, [clears throat] so Manny on Timber,
where we used to rent some space from,
[57:34]
they've done a uh a deep paving effort
as part of managing the storm water
[57:38]
management on this like massive parking
lot. Um, and they also have a couple of
[57:44]
um companies in there, a landscape
company, um, is one of them. Um, they've
[57:51]
done public art to kind of contain like
that's a that's just a cargo container
[57:57]
that they put public art on. And that's
one of our ideas is to kind of use
[58:02]
potentially like um quar containers like
that to to delineate our space with
[58:08]
potentially putting some of the um
public garden spaces on the outside so
[58:12]
that there's like a nice like it's an
inviting kind like we we create
[58:16]
something that looks looks nice and and
so you're not seeing our equipment and
[58:21]
also for safety but something that we
could invite um some public art
[58:26]
opportunities. They've also taken the
opportunity by depaving
[58:30]
big sections of the parking lot. They've
built retaining walls out of the old um
[58:36]
pavement and created this little micro
forest inside of it.
[58:40]
» So, if you if you don't mind scrolling
up a little further, you can see how you
[58:45]
kind of walk through. There's a couple
of entrance ways and then they have
[58:48]
these um sitting areas in there. So, I I
put this in more just to kind of say
[58:52]
like, look, there's there's a lot you
can do with with a 1 acre parking lot.
[58:58]
Um, and it could it could be a place of
uh business for us, but also something
[59:03]
that we make better use of, and also it
it has the potential to be um, you know,
[59:09]
we could get MS4 credits out of it as
well, which is another huge plus. Um, so
[59:17]
if you don't mind scrolling again. Um,
so I I put some work into this. Uh, I
[59:23]
basically took the uh deferred
maintenance report that was put out in
[59:29]
um I think it was 2022. I'm I'm not 100%
sure. I I shared a secondary PDF that is
[59:36]
just an excerpt of that particular
document and it lists all the deferred
[59:40]
maintenance for the property and
created kind of a top level set of um
[59:46]
potential grant opportunities and
funding partners which is here in this
[59:50]
on this page of the document. And then
fur like further down I broke down every
[59:56]
section of the property into the
deferred maintenance potential more
[1:00:00]
ecological or sustainable alternatives
that [snorts] grants could be written
[1:00:05]
for that funding. There's funding
opportunities around doing a lot of the
[1:00:09]
infrastructure upgrades that were
mentioned. Um but I don't think we would
[1:00:16]
have the time nor do I have I think the
brain power to dive into like lots of
[1:00:20]
specifics on that. And that can be for
another time potentially if this idea is
[1:00:25]
of interest. Um, but I did want to just
go through that and create that gesture.
[1:00:31]
Um, just to show that there's a lot of
potential behind this. As soon as you
[1:00:34]
kind of change the lens, you kind of
reframe the intent of the property.
[1:00:39]
Funding opportunities and really
creative ones open up. Um, so I like the
[1:00:45]
idea of kind of creating this umbrella
like ecological campus idea and then it
[1:00:51]
starts to um it it creates a set of it's
it's mission based. It creates a set of
[1:00:57]
tenants that you start to figure out how
to slide in brand opportunities, other
[1:01:01]
potential um not just funding partners,
but maybe there's other um organizations
[1:01:06]
that are interested in renting space.
How can the community start taking
[1:01:10]
advantage of this? um and utilizing the
space for um symposiums, different
[1:01:16]
events that could be hosted. Um so I did
make a list of some of those potentials
[1:01:21]
in my write up and we really want to
also make sure and again I'm presenting
[1:01:27]
it council meeting tonight but
[clears throat] that a next step if
[1:01:31]
there's interest in this would be
immediately engaging the different like
[1:01:36]
community members and community
organizations. We're not blind to the
[1:01:39]
fact that this is something that if it's
going to be community kind of centered
[1:01:44]
that we need everyone's voices kind of
to to see the full potential. We want to
[1:01:51]
open that up and see see where we can
kind of explore this idea further. Um,
[1:01:58]
and we also know it's there's there's a
lot of contention around the use or the
[1:02:01]
proposed uses for the property. And so
don't want to, you know, not acknowledge
[1:02:06]
that that that is a situation and and
hope that this might be again another
[1:02:12]
catalyst for a conversation that gets us
past that or or allows us to explore
[1:02:17]
other alternatives that may have not
been presented yet. Um, but I do think
[1:02:22]
it is important to go, if you don't
mind, just go back to that document for
[1:02:26]
just a second.
Um,
[1:02:31]
and I apologize. I don't remember on
what page
[1:02:35]
it was. Let me see on my end here.
I wasn't sure if I was going to be able
[1:02:40]
to present or not. So, I I put this into
like a document that people could just
[1:02:45]
review. So, I apologize that it's not
like in slides. Yes. So, this right here
[1:02:51]
is just kind of like these are like the
more top level um
[1:02:56]
grants that are available and and
potential funding partners that I
[1:03:02]
reviewed with Moren as just a kind of
somebody else to kind of help like think
[1:03:09]
through like these are these are folks
that we work with on a more regular
[1:03:13]
basis to to fund um other public facing
projects. Um, and so there really is a
[1:03:21]
lot of potential. I I would feel kind of
foolish to come here tonight and and
[1:03:24]
present something that I didn't think
had potential or had these opportunities
[1:03:28]
to to to also find ways that the burrow
doesn't necessarily need to invest their
[1:03:34]
own money in trying to make something to
this this like this come to fruition. um
[1:03:39]
refugeia on our own wouldn't be able to
like help manage the full like
[1:03:45]
[clears throat]
like the grant writing etc. But we would
[1:03:49]
we'd want to be involved in helping with
the the vision and maybe
[1:03:55]
organizing a a group that helps kind of
take the next steps um or even in
[1:04:01]
helping the burough. I I know one of the
common practices is that if there's
[1:04:05]
grant writing that needs to happen that
we're we're kind of writing that
[1:04:09]
administration,
uh we're writing part-time part-time
[1:04:13]
positions into those grants so that
we're thinking about how to actually get
[1:04:18]
the the folks in place to help make them
happen. Um, so on your own time you can
[1:04:25]
kind of like look through what I wrote
in wrote up in in a little bit more
[1:04:29]
detail. But um it's been pretty cool
just and I can say to kind of to the
[1:04:35]
community that I I've done I've had the
opportunity to speak nationally at at
[1:04:40]
various events kind of presenting the
work that we do. And um we have around
[1:04:46]
150 uh properties in our ecological
greenway that are in within a 5 mile
[1:04:52]
radius of the building we're sitting in
right now. And [clears throat] when I
[1:04:56]
present at at national conferences, it
blows people's minds to see. And I have
[1:05:02]
this little map that's on our website uh
showing all of these um kind of like
[1:05:09]
like their native landscapes that we've
helped uh [clears throat] homeowners in
[1:05:13]
particular do. But what we also feature
is all of the properties that other home
[1:05:19]
gardeners and other public spaces have
kind of taken on in their own. and we're
[1:05:24]
kind of like somewhat secretly
recognized as being this kind of like
[1:05:28]
we're we're we're seen as as like uh the
sea change of this comic. So, it's
[1:05:34]
pretty cool that in our we're a little
bit of an incubator in our area for um
[1:05:39]
for a national an international trend
that that's well, I wouldn't even call
[1:05:44]
it a trend anymore. It's it's a it's a
crop movement. Um and the landscape like
[1:05:50]
industry and gardening is heading in
this direction. It's one of the reasons
[1:05:54]
that uh we do so much storm water work
is because we consider our landscapes
[1:05:59]
functional. I mean they're doing
something. They're not just pretty to
[1:06:02]
look at, but they are also the plants
have functionality. They're helping
[1:06:07]
manage storm water. They're creating um
wildlife habitat and recreating wildlife
[1:06:12]
habitat. We're putting natural systems
back in place in very small properties
[1:06:17]
normally. But when you add up the impact
of all of those postage stamp
[1:06:22]
properties, you start to see major
impact. And we've we've seen like Anwin
[1:06:26]
Road is one of the streets we have five
or six properties on. A bunch of
[1:06:30]
neighbors have al also done
um a lot of work similar to ours and
[1:06:35]
we've been able to start mitigating
people's basement flooding. So over
[1:06:40]
time, more lawns and starting
um put more energy in what can we do on
[1:06:47]
our own properties. We we see that
payoff. Um so with that, I'll [snorts]
[1:06:53]
uh I'll conclude, but uh I'm open if
anyone has any any questions.
[1:06:59]
» Sure. I'm just going to start around the
table. I will say that you know walking
[1:07:02]
around the bur routinely encounter you
know your signs and the the gardens
[1:07:06]
you've worked on. I think we we all um
are familiar with the the and the
[1:07:12]
product and I think it's a it's a great
asset um to burn. Uh right now just want
[1:07:18]
to note we are is a discussion item. We
are not going to take any action after
[1:07:22]
this but questions for or comments.
>> Yeah, I mean I see your work everywhere
[1:07:27]
and I'm I'm very impressed by it. Um,
and I really thank you for bringing your
[1:07:33]
creative ideas to the table and I think
it's always healthy when community is
[1:07:37]
coming to us with ideas. Um, but I do
want to go back to something that we had
[1:07:42]
agreed on as council uh last year which
was that um any plan for this particular
[1:07:49]
site needs to uh relieve the burrow of
the the cost and responsibility of the
[1:07:56]
the buildings. And [clears throat]
so other than preserving and expanding
[1:08:01]
the park space, I do think that was the
clearest consensus item on council that
[1:08:08]
that was a big goal for for that
particular site. And and I would say
[1:08:14]
that was probably one of the the main
reasons we started that process in the
[1:08:18]
first place. So, um I think that's the
biggest piece that might be missing. I I
[1:08:23]
recognize that there's um there's grant
opportunities, but also brands are not
[1:08:29]
guaranteed. They often require a
thorough match um and they're they also
[1:08:36]
require a lot of administrative time to
to explore to administer and all of
[1:08:41]
that. Um, so
I think the the main issue that that I
[1:08:49]
would have is uh that the burrow would
still be a landlord and we're trying to
[1:08:54]
extricate the the burrow from that
position. I think there's a risk um in
[1:09:00]
having the burrow continuing to be a
commercial landlord. Um
[1:09:06]
there's always the risk that commercial
tenant might leave. So then we're right
[1:09:10]
back in the same position that we were
uh
[1:09:14]
where we started and then there's all
the millions of dollars of capital
[1:09:19]
improvements that are needed to bring
the building which you have gone
[1:09:24]
through. Um but I do think that we're
looking for a plan that uh takes that
[1:09:31]
risk and the cost um off of the bureau
and off of the burough taxpayers. Um so
[1:09:37]
I would I would say um
any any plan that we would need to look
[1:09:43]
at would have to meet that minimum
requirement. So um and also I I do want
[1:09:50]
to like as a creative myself um I come
from a design background. I appreciate
[1:09:56]
the the the concept of bringing artists
and makers. Um I know the box building
[1:10:04]
too. I've gone to several events. I
think it's a different economic model
[1:10:08]
there though. I mean, it's in the middle
of a very dense area which um I will say
[1:10:15]
has like a lot of different diverse uh
price points for housing. Um and it's
[1:10:22]
that makes it possible. It also has the
you mentioned the black bar. That's part
[1:10:28]
of its financial model. That's that's
why the rents are so low and artists can
[1:10:32]
come in and occupy that building and
make it successful. So, um I don't think
[1:10:38]
that will translate so well in
[1:10:45]
» I would love to put a block party.
Um thank you. Thank you so much for for
[1:10:51]
uh bringing this forward for putting
time and energy into it. Um
[1:10:56]
we see like the fruits of your labor all
around actually.
[1:10:59]
my neighbor across. Sorry to put you on
the spot, but I get to see the fruits of
[1:11:03]
your labor in Barb's uh front yard every
day. Um it's and it's it's really
[1:11:09]
awesome and it's it's awesome to
actually have some local folks come
[1:11:13]
forward with uh with really like, you
know, creative ideas. Um, I think that,
[1:11:19]
so I'm going to I'm going to riff a
little bit on what Jean said, but I I
[1:11:23]
have um something that was also Kate
Brenley that I'll get to um at the end,
[1:11:28]
but I had a lot of like the
similar um kind of concerns which are
[1:11:34]
not you concerns. They're more so just
and you spoke to this about just kind of
[1:11:38]
like the needs um that we've had
approaching the site and kind of the
[1:11:42]
thicket of it. One of the things that
we've heard from uh prior people who've
[1:11:47]
sat in the seats because the the the the
property has been discussed since before
[1:11:51]
our time as well. It's just the
difficulty of being able to maintain and
[1:11:57]
manage the site that our local
government is not a particularly good uh
[1:12:02]
commercial landlord. And that's part of
the that's been part of the difficulty
[1:12:05]
that got us to this kind of spot. Um I
you know uh I think that grant funding
[1:12:12]
our our old manager used to describe
grant funding as coupon bonds where um
[1:12:16]
they're good funding source um they're
not your overall kind of strategy for a
[1:12:21]
recurring um operational um or financial
situation which is I think what we have
[1:12:28]
there. And so some of the things that
we've discussed in the past, including
[1:12:32]
in December, um, and if folks are
listening online, they can go and we
[1:12:36]
have them listed on the Sabbine page
under the December 2025 links. Um, and
[1:12:42]
we hit a bunch of things and we kind of
like tried to pull together a lot of the
[1:12:45]
different items that have been discussed
through the engagement process and a lot
[1:12:49]
of the different needs. Um, and one of
the one of the main things was how do we
[1:12:54]
figure out a way to simultaneously
maintain ownership of this property as a
[1:12:59]
key asset while also relieving the
bearer of some of those financial and
[1:13:04]
administrative and operational
um, uh, issues. Um, and that's been a
[1:13:10]
tricky thing to solve. I feel very
confident that we can solve that. I feel
[1:13:14]
very confident that we can get um,
proposals in front of us that hit a
[1:13:18]
variety of different needs. Um, and I
also really appreciate you've elevated
[1:13:22]
kind of this other aspect of it that
hadn't kind of come up before. Um, but I
[1:13:28]
really appreciate the time and energy
you've given to that. And I went back to
[1:13:32]
um the uh document that we had discussed
and agreed upon. It was a different we
[1:13:37]
had a one different council member
different mayor at the time but the
[1:13:40]
there were six of us who were here and
went back to that document and um
[1:13:45]
there's a portion of that that said I'm
just going to read from it um additional
[1:13:51]
consideration be given in proposals that
incorporate existing uses that serve the
[1:13:55]
community publicly available community
space and/or park plan improvements or
[1:13:59]
maintenance and I think at the time we
had we had specified it that way because
[1:14:04]
we were expecting
um that in addition to kind of the
[1:14:07]
anchor uses that we're in that that we
might have proposals that would allow us
[1:14:11]
to carry forward um incorporate existing
uses and serve the community and when
[1:14:16]
we're kind of considering the site. Um
but you've raised another um you know
[1:14:21]
potential need that might be able to be
incorporated into that kind of component
[1:14:25]
of the of the of the plan set. Um so
that folks so that that would be out
[1:14:30]
there. We could potentially put add this
to the letters of interest online if we
[1:14:35]
wanted to. We could um specify either um
space for small local existing
[1:14:41]
businesses or ecological based
businesses. We could kind of figure that
[1:14:44]
out. Um and then that would that along
with the letter being available online.
[1:14:50]
um would I think allow folks to come in
through that RFP process that we've been
[1:14:56]
envisioning would allow this kind of
space to be incorporated into this
[1:15:00]
broader kind of campuswide vision. Um
and I think would also put us the Vera
[1:15:05]
in a in a good position to have a lot of
these kind of like just the full
[1:15:09]
creativity. um and then channel it
through a like a standardized process
[1:15:14]
because I think one of the things that
has given us difficulty in the past, one
[1:15:17]
of the things that I thought um the RFP
process was intended to resolve for was
[1:15:22]
we would get kind of like popcorn type
ideas. And this is a great one cuz it's
[1:15:26]
coming from internally. Uh but I do
think that we should get back to a
[1:15:30]
standard um process and then at a policy
level we can kind of work through that
[1:15:37]
process the way that we've been doing.
Um, but then it also puts our local
[1:15:40]
partners in a good position as well
because then they know what the steps
[1:15:44]
are and everyone kind of has clarity.
Um, and then you know at what step to
[1:15:48]
kind of schedule your energies as well
cuz the last thing I want to do is be
[1:15:52]
like, "Oh, go do all of these things."
Oh, and then wait for this like we will
[1:15:56]
have everyone will have clarity on all
of that. And I think that that could um
[1:16:01]
kind of incorporate this into this
process that we've been discussing since
[1:16:05]
December and put us in a really
productive position together. So I
[1:16:09]
really appreciate um your time and
coming and raising this. And
[1:16:13]
» um yeah, it was one of the questions I
had for Maggie cuz I was like um and all
[1:16:18]
of these things make sense, right? Like
>> if I'm to be a little blunt, it's like
[1:16:23]
like waiting through waiting and I would
say maybe waiting through an RFP process
[1:16:28]
when we do need to move our business is
becomes a deal breaker
[1:16:33]
» for a business like ours in the
community or a potential deal breaker,
[1:16:37]
right? And that's not to apply any
pressure to say if you like this idea
[1:16:42]
can we explore some other options or
does it just get digested into a larger
[1:16:47]
RFP process where our ideas it doesn't
just become adaptive reuse for housing
[1:16:52]
but then it's this other idea of this
potential like a hub idea and then our
[1:16:58]
we get but we kind of get taunted from
or or I I see what you're saying by it
[1:17:04]
becomes a popcorn idea but we want it to
be more than a popcorn idea. [snorts] Um
[1:17:10]
there's there's intellect there's like
some intellectual property. I'm sharing
[1:17:14]
a very top level concept. Um, and I
think there's more I I'm always a
[1:17:19]
believer that there's and I'm not asking
for exclusivity with this, but I think
[1:17:24]
sometimes like and I [clears throat]
understand why going through certain
[1:17:28]
processes are very important to follow
just for I know and I know it's it has
[1:17:33]
to happen that way sometimes, but I I do
wonder like options to explore not
[1:17:40]
having
>> to like go through all that because I
[1:17:42]
just I don't quite I honestly don't know
that we'd be able to wait
[1:17:47]
however long it's going to be. I might
have to be out of the Price House in 2
[1:17:52]
months. I don't know. So, and then I
would end up just like everybody else
[1:17:57]
like going to Ka Haken or somewhere and
we are looking at other properties. I've
[1:18:02]
I've spoken with uh [clears throat]
uh Laura Marian a few times like the
[1:18:06]
properties didn't quite add up but they
were keen and interested in this same
[1:18:10]
kind of model. Um, and also looking at
another property in Armore, but I'd
[1:18:14]
really like to keep I'd like to stay in
Arbor and I think a lot of people would
[1:18:20]
like to see us stay in Nar. And I think
that putting that energy
[1:18:28]
behind like not just community members
but our businesses allows us to kind of
[1:18:33]
like I I I think
there there's got to be some room for
[1:18:38]
like we have to search for catalysts to
kind of up like like we have a downtown
[1:18:46]
that's been sitting I know you guys have
a lot of challenges in front of you. we
[1:18:49]
have a downtown that's just been like
mostly vacant. How do we [snorts] spark
[1:18:54]
that, right? And it and I don't know, we
haven't seen other people coming in and
[1:18:59]
doing things. I I haven't seen stuff
happen in years. Um and I think there's
[1:19:05]
an opportunity like finding even if that
property is a sitting duck right now to
[1:19:09]
do something with it allow like allows
for some energy to come in and start to
[1:19:15]
like for us to see more of our full
potential. Um, that's part of the
[1:19:19]
intention behind this and I know that's
not really something I can say in a
[1:19:23]
presentation, but
>> point well everybody.
[1:19:27]
» Well, it's a point well made because I I
thought we could have actually started
[1:19:29]
that process like at the earlier the
year. There were logistical reasons why
[1:19:33]
that didn't happen, but I would think
that if we were able to incorporate that
[1:19:36]
into an RFP process, I would advocate
for us to get started on that very
[1:19:40]
quickly so that we actually can resolve
some of these issues um through that
[1:19:45]
standard, pick up the pieces that like
right, one of the main themes we have is
[1:19:49]
being able to hit all of these varying
needs and and I think that we should get
[1:19:53]
started on that and pick up that work
that we've been doing, incorporate the
[1:19:56]
good bits of things, try to hit this
whole variety of needs and and actually
[1:20:01]
move forward rather than just be caught
in constant stasis which you know it's
[1:20:07]
been a little bit. [laughter] Um so
Michelle Paninopoulos um she and I were
[1:20:13]
elected about 9 years ago. She really
took the lead on Sabine and she said
[1:20:17]
somebody has this great idea that we've
never ever thought of. And I think
[1:20:21]
that's this um and when I thought when
that you were even considering Sine is
[1:20:26]
when I got involved to say tell me what
you're thinking. And quite honestly,
[1:20:29]
this idea of an eco campus that hits so
many of the missions and values of our
[1:20:35]
community felt like it was worth
exploring and it was worth exploring
[1:20:39]
with the community. I I think um I
appreciate your timeline very much so
[1:20:44]
right is that you are going to have to
leave Nar. Um, I think it is worth our
[1:20:50]
time to explore given the connection and
the support of the conservancy and the
[1:20:54]
county is for us to explore this a
little bit more seriously as some type
[1:20:59]
of long-term lease that alleviates us
from that maintenance and being a
[1:21:03]
landlord because I do believe that it
hits not only the mission but community
[1:21:07]
feedback of stormwater community
expanding green space you know the
[1:21:12]
opportunity to have a multigenerational
living learning and garden with New
[1:21:17]
Horizons and Wonder Springs is something
that I think deeply reflects the values
[1:21:22]
of our community. Um,
with that said,
[1:21:27]
you know, not to sound crass, but I'm
also interested in keeping your business
[1:21:31]
privilege tax and your EIT in our
[clears throat and laughter]
[1:21:35]
um would be a reality. I mean, if we if
we could get that um and really
[1:21:42]
seriously explore how the conservancy
and the county would leverage those
[1:21:45]
funds and do something that might be a
really great gift to our community,
[1:21:50]
I would love to see us seriously explore
this. And I suspect now with the the
[1:21:55]
adoption of fungi that we might even
have community donors coming through
[1:21:59]
wanting to really earmark funds in a way
that perhaps they had not in the past.
[1:22:05]
» Okay. Thank you, Sarah.
[1:22:09]
» I'll be brief. This is really valuable.
Incredible. [clears throat] Thank you so
[1:22:13]
much. And uh I agree. I think it's
something that we should be exploring uh
[1:22:18]
really carefully.
But I agree. Thank you.
[1:22:23]
[clears throat]
[snorts]
[1:22:24]
» D you want to jump in? Okay.
>> Uh just a couple of thoughts. Um I'm not
[1:22:30]
sure. I think we'd have to check with
Mr.
[1:22:33]
But my recollection is that he
has advised that we would have to do
[1:22:40]
this through an RFP
which I understand could be problematic.
[1:22:45]
I would definitely I mean I love this
idea so I would certainly want RF RFP to
[1:22:51]
be inclusive enough to allow for you to
put that in. I understand that could
[1:22:57]
create a but we may be and I do want to
check with John on this. we may be
[1:23:01]
legally bound to have to put out an RFP.
Um I guess you [clears throat] know
[1:23:09]
having having just spent the last 5
months dealing with storm water
[1:23:13]
[laughter]
issues you know one thing is our storm
[1:23:16]
water you know if that's going to be a
change in volume you know one thing that
[1:23:21]
we have to think about is yes the cost
of all the deferred maintenance is
[1:23:26]
significant what do we balance against
that we balance against that the EIT
[1:23:31]
business privilege tax if we can do a
lot of storm water mitigation up on that
[1:23:37]
property and it,
you know, allows us then not to spend
[1:23:42]
how much per how much are we paying per
bump out
[1:23:45]
» different
as of now it's in the wrong watered
[1:23:50]
the rules
>> completely in the whole state
[1:23:55]
into an unimpacted
>> unimpacted water
[1:23:59]
if they change the rules.
>> Yeah. Yeah. Well, you know, we don't
[1:24:02]
know. And I guess the other changes
there,
[1:24:04]
» right? So, the other question is
you presuppose that we're maintaining
[1:24:10]
the properties as is and maybe a
smaller,
[1:24:16]
you know, maybe some of those properties
do come down the the and we don't have,
[1:24:21]
you know, you're you're assuming, hey,
let's make use of everything that's
[1:24:24]
there. If we're concerned about the
deferred maintenance, especially on
[1:24:28]
certain portions of that property, the
alternative is not well, we don't keep
[1:24:33]
all those properties. We tear them down
and we only maintain, you know, to start
[1:24:39]
with at least
a smaller footprint of properties. Maybe
[1:24:43]
in the future we get additional grant
funding and things like that. So, I'm
[1:24:46]
just trying to think that through about
addressing Jean's concern, which we did
[1:24:51]
say, you know, go, do we really want to
be a landlord? Do we want it? You know,
[1:24:55]
this is becoming more and more of a
burden as every year goes by. I think
[1:24:59]
there are ways we can try to be as
creative as you're being in terms of how
[1:25:04]
to mitigate those things by perhaps
looking at at some of those things. Um,
[1:25:10]
and [clears throat] you know, the
deferred maintenance included the
[1:25:13]
driveways and the pavement and all the
things that that you're pointing out
[1:25:17]
that would need to be fixed
regardless. I think if we own the
[1:25:22]
property, some of the ADA stuff is
probably on us regardless. Not
[1:25:27]
» you unless we really do just pure
groundies. Um, so I I definitely think
[1:25:33]
this is
I I'm excited by the idea. It meets the
[1:25:38]
educational component that some people
have contended is a necessary predicate
[1:25:43]
to you know the use future use of the
property. Whether we agree with that or
[1:25:48]
not is a different issue. But um you
know I think we have to be
[1:25:54]
honest about that being a potential
issue out there and I think this
[1:25:58]
adequately addresses that. You know it
definitely addresses a lot of the things
[1:26:03]
you know we have these competing
objectives throughout always. You know
[1:26:07]
it's funny we were at that fundraiser
last night and I was talking to somebody
[1:26:10]
in uh Plymouth Township and I was like
what are your you know what are your
[1:26:14]
issues? What are our issues? affordable
housing, land use, you know,
[1:26:18]
preservation of open space. Um, you
know, it's those are definitely
[1:26:23]
competing objectives. Um, and at the end
of the day, we have to make a policy
[1:26:28]
decision on that. But this is definitely
one of our objectives is is I I think
[1:26:34]
this is consistent with sort of our
long-term environmental objectives that
[1:26:40]
that we as Bur adopted.
So I I definitely think it's worth more
[1:26:47]
exploration.
[snorts]
[1:26:48]
» So yeah, I share the concern about the
RFP process and you know and um that
[1:26:56]
that's probably going to have to be how
we determine what what goes forward on
[1:27:01]
this property is through an RFP because
you know it's what we've been uh
[1:27:07]
[clears throat] I feel like that's the
way to put it out and we may well be
[1:27:11]
bound to that. Um, so just the other
part of it is it's always has been my
[1:27:17]
hope that we could c stop being a
commercial landlord on this property
[1:27:22]
like for good like for the long term. um
more than just
[1:27:28]
10 or 20 years, you know, but for 100
years, you know, we should we should be
[1:27:33]
able to hopefully dispose of this
property in a way that's both beneficial
[1:27:39]
uh to the community and doesn't do so
much uh uh
[1:27:46]
harm uh financially.
Uh we do currently uh get rental income
[1:27:53]
from this property that offsets our
taxes. It's not it's you know it's still
[1:27:58]
significant. Uh it is sitting but that's
only contingent because we're it's
[1:28:03]
sitting on top of a ton of deferred
maintenance. So we kind of have this
[1:28:06]
dual problem here is that you know every
year the risk gets higher. Uh you know
[1:28:13]
the peril that something goes wrong on
that property is higher. you know, does
[1:28:17]
it need a new roof? Does it need a new
boiler? Does something completely
[1:28:22]
unforeseen happen? That's on us. Um, so
and it's also the reason why I would
[1:28:29]
favor an RFP for something
uh for an extended ground lease because
[1:28:35]
it would enable the new user to take
over deferred maintenance.
[1:28:40]
That's kind of my top priority on this.
Um, the presentation itself is
[1:28:44]
beautiful. you know, I I love the idea
of more green space. Um,
[1:28:52]
and uh, as far as the storm water map,
while you were talking, I did pull up
[1:28:57]
the the MS4 map. MS4 only covers
uh, properties that drain into Delaware.
[1:29:04]
And most that property is actually
split. Like there's the line goes right
[1:29:09]
through the building. I'll pull it up
again. Um,
[1:29:13]
look
[clears throat] at
[1:29:16]
» uh where is it?
[1:29:21]
» Up here. Right here.
>> Yeah.
[1:29:22]
» Yeah. So, uh, at the end of Elm Terrace,
there's a line that goes, it looks like
[1:29:27]
it cuts off the very, um, eastern most
part of the building. Everything to the
[1:29:34]
west of that drains into the Delaware.
everything to the east of that which is
[1:29:38]
the the edge of the building the parking
lot and what's currently say by park
[1:29:43]
drains into the Skookul River. Um and I
don't think that's likely to change. you
[1:29:49]
know, the the most we've heard about is
that we'd be responsible for retention
[1:29:55]
with a change in NS4 law, but not a
change of river because uh and I gather
[1:30:00]
that's because the part of the school we
drain into is not titled.
[1:30:05]
Um,
[1:30:08]
so
[1:30:11]
if there were going to be a storm water
solution on that property, it would have
[1:30:14]
to take place where the building is now,
you know, on the Essex side. And I'm not
[1:30:21]
sure how that would work. Um, it'd be
great if we could we could, you know,
[1:30:28]
borrow
>> you know, it's so painful to have to put
[1:30:32]
these to put these bumpouts in every
year and I just thinking about it. Okay,
[1:30:37]
but no, that's an extra. Um,
okay. I'm sorry for the mish mash of
[1:30:42]
concerns, but I echo everyone else's
enthusiasm for this kind of thing and
[1:30:48]
also for the concerns raised about, you
know, the disposition of this property
[1:30:53]
in the very long term. And that's it's a
>> Yeah. So, Jeeoff, I think you'd make a
[1:30:59]
fantastic tenant for the property. I
think that the the vision you've laid
[1:31:02]
out for what you would do, you know, as
an as a as a tenant of the property, as
[1:31:06]
as an occupant of the space is uh is
very attractive and it works well with
[1:31:13]
the the park, you know, which we have
existing infrastructure. you'd be, you
[1:31:18]
know, transitioning from a park to a,
you know, a park-like environment with
[1:31:22]
your your storage area and back would,
you know, with all the plants would be,
[1:31:27]
you know, it's a it transitions well
into into the, you know, the the actual
[1:31:32]
public park space.
I I agree that the the problem is the
[1:31:36]
the moving from what you would do as a
tenant to how the whole building would
[1:31:41]
function and how the burrow would you
know how it would be managed, what would
[1:31:45]
happen to the maintenance, the grants.
So I think that portion is is the
[1:31:50]
difficulty. I think that you know were
we looking to continue our current setup
[1:31:55]
where we're we're renting out the space
I think you'd be an ideal tenant for
[1:31:58]
that space. Um but we are looking beyond
the tenency and I think that's where
[1:32:05]
you know more
we're looking for more certainty I think
[1:32:10]
than than than what you've suggested. I
mean, it would be great if grants were
[1:32:15]
able to cover
um a transformation like this, but I
[1:32:21]
think that's
it's far from clear. And I I I don't
[1:32:28]
Yeah, I don't think we can commit at
this time to something where the burrow
[1:32:31]
would be on the hook for the the
transformational costs. Uh I think if if
[1:32:37]
it could be grant funded um you know
that would be a much more appealing
[1:32:41]
prospect than the certainty of the
burrow you know having to having to
[1:32:46]
cover these costs. So those are my
concerns right now. I will note that the
[1:32:50]
lavender space is currently empty and uh
there is 18 months uh in the contract uh
[1:32:58]
of teny before anything we have to give
any tenants 18 months of warning before
[1:33:03]
any changes to the property. that
[laughter]
[1:33:07]
[snorts]
uh you could apply to be a tenant if you
[1:33:10]
wish to be handled by our uh primarily
by our our manager and our building
[1:33:15]
manager not by council but it is a
possibility even outside of what happens
[1:33:20]
here.
Okay. Um
[1:33:25]
» can I just ask you a question? What if
we do an RFP and we say the preference
[1:33:30]
is you know to dispose of the property
and we don't get a bid for that
[1:33:39]
like can we have as the alternative like
a less attractive alternative is you
[1:33:45]
know a full tenant for the property.
>> Let's let's pause that because we're
[1:33:49]
going to have a an RFP discussion
logistics RFP in a minute. So any any
[1:33:53]
other comments about chess proposal?
>> I guess just a question. How long of a
[1:33:58]
lease would you want to sign for?
>> I was I thought 5 to 10 years.
[1:34:02]
» Yeah.
>> Uh or more. It it really depends. I mean
[1:34:05]
I think if I could just summarize a
little bit. I think what I was thinking
[1:34:10]
and presenting right was to kind of like
find this nucleus of like okay
[1:34:16]
understanding the challenges of the
landlordship,
[1:34:19]
the deferred maintenance, right? Like I
went through that section of the
[1:34:23]
deferred maintenance and some of it
didn't freak me out at all. I mean it's
[1:34:27]
like you have companies that like want
to put advanced sustainable technology
[1:34:33]
in places where people can see them at
work. Like that's one way to deal with
[1:34:38]
the HBA systems or HVAC systems. Like
there's there's ways to kind of think
[1:34:44]
about some of this that I don't even
know could potentially bypass grants. I
[1:34:48]
just I think there's like an opportunity
to um think through some of that middle
[1:34:54]
ground that is that's unclear or that is
kind of pushing for like want to see the
[1:35:00]
burrow be able to like shed themselves
as responsibility. Um but I think
[1:35:06]
there's there's just opportunities to do
that and maybe I I you know grants was
[1:35:11]
not the entirely right way to like look
at this. Um, I I think with the Bach
[1:35:17]
building there was some some level of
like like um sweat equity for ownership.
[1:35:25]
And I'm not suggesting that I'm like
looking to own this property
[1:35:28]
necessarily, but there's probably
other ways to think about like funding
[1:35:35]
for some of this that
maybe is a little bit easier and more
[1:35:39]
streamlined than hoping for grants or
like look Yeah, I I I by by talking with
[1:35:45]
Moren from the consery and like I I and
thinking about I mean it's like a
[1:35:51]
million something for deferred deferred
maintenance which is Not an
[1:35:55]
insignificant amount of money.
>> Significantly more than that.
[1:35:59]
» Is it from like 2018 or
>> No, it's even bigger than that. It's
[1:36:04]
more like four or five.
>> Does anyone have an actual figure on it?
[1:36:08]
» We can get it. We have it somewhere.
[clears throat]
[1:36:11]
» It's It's more than that. It's
>> okay.
[1:36:13]
» I think it was a million to tear it
down.
[1:36:16]
» A million just to tear the village down.
Yeah, those are the data estimate was a
[1:36:20]
precoid estimate.
>> I think
[1:36:23]
I think the last time we talked about
it's closer to two.
[1:36:26]
» So the um the 2021 econult
report estimated that the total deferred
[1:36:34]
maintenance is $4.7 million and this was
2021.
[1:36:38]
» That's why we're so worried about if it
was 1 million. Yeah, there's a lot of
[1:36:41]
creative solutions. 4.7 million.
>> Is that preverb for post? That's
[1:36:45]
» I was going to say there have been we've
done some stuff
[1:36:48]
» that that is um
[1:36:53]
» No, this is post this is post roof.
>> So, the burrow has replaced the roof and
[1:36:58]
damaged sophets, gutters, and downspouts
for $600,000 in 2020. It has identified
[1:37:03]
other deferred but necessary maintenance
totaling approximately $4.7 million.
[1:37:11]
» All right. Well, thanks Jeeoff. And we
do have
[1:37:13]
» You're welcome. Yep. And uh
uh next we're going to discuss the uh
[1:37:20]
the RFP process and how it would work if
we decided to proceed along that route.
[1:37:25]
So Maggie, if you want to talk to us
about logistics here.
[1:37:29]
» Sure. Um so I've been doing a little bit
of uh looking into what a process like
[1:37:34]
this might look like um if we were to
draft an RFP. Um so based on the
[1:37:39]
direction that council gave in December
of last year, um we were looking at
[1:37:44]
adaptive reuse for this property,
looking at workforce housing and maybe
[1:37:49]
some other supporting services uh to be
retained on the property and
[1:37:54]
preservation of the existing park space
um and general layout of the parking
[1:37:59]
lots uh to service both of those uses.
Um the process uh if we were to proceed
[1:38:07]
then with the RFP is um either uh
in-house or with the aid of a consultant
[1:38:14]
to help us draft the RFP. We would
outline all of the necessary asks. We
[1:38:20]
would say what we're looking for. Um we
would give the scoring rubric that we
[1:38:25]
would be evaluating responses against
and we would vet that out. um we would
[1:38:34]
uh take that before the community for
some feedback before we actually issue
[1:38:38]
the RFP which is the direction that
we've given in the past is that there
[1:38:41]
would be some public engagement. The RFP
would then be issued. We would then
[1:38:47]
receive responses and then again if we
were doing this in-house or if we have a
[1:38:52]
consultant we would then evaluate those
responses again using the pre-identified
[1:38:58]
scoring matrix um as our benchmark for
how we evaluate these.
[1:39:05]
We would then make a decision if one of
those options is something that we would
[1:39:09]
want to proceed with. Um again highest
ranked based on that predetermined
[1:39:14]
scoring matrix. um if we don't like any
of the options, we're not beholdened to
[1:39:18]
any of this. Um but otherwise, uh if if
the price is right, if the project is
[1:39:24]
right, um and the um the proposal hits
all of the marks, then we would engage
[1:39:30]
in a u you know, professional services
agreement with this developer and
[1:39:35]
proceed with getting all the necessary
um documents um orders and and whatever
[1:39:40]
else we need to to proceed with that
work. um from the timeline of drafting
[1:39:46]
the RFP to potentially awarding a
contract is about a six-month timeline
[1:39:53]
in a perfect world. Um so that would be
about a month to develop the RFP. Um
[1:39:59]
about a month for a public engagement
process, about a month then for this RFP
[1:40:04]
to live out in the world to receive
responses. So what do we have? 3 months.
[1:40:08]
Um, and then once we receive responses,
we want about a month to evaluate them.
[1:40:15]
I feel like I'm missing a month in
there. [snorts]
[1:40:18]
» Are we rewriting after the public
engagement? Are there any to put a time?
[1:40:23]
» It was a month. So, a month to write it,
a month for engagement,
[1:40:27]
a month to put it out in the world, a
month to evaluate responses,
[1:40:33]
» turn
um
[1:40:36]
» and incorporate revisions based on
public engagement feedback.
[1:40:40]
» There's a month in there before.
>> Okay.
[1:40:44]
» Anyway, so about 6 months. Um and
uh Right. So, we'd be looking at a
[1:40:51]
six-month process. So if we were to have
an RFP drafted
[1:40:56]
at the end of September, it would be 6
months from so figure October, November,
[1:41:01]
December, January, February, March. So
we'd be looking at a spring timeline for
[1:41:06]
having um having a decision point before
us at that point and then we would be
[1:41:12]
able to compare apples to apples with
these proposals um if that was something
[1:41:18]
that you would want to proceed with.
Okay. Can I do the Fred and Maggie know
[1:41:23]
this is coming before we even start down
this path? I think council has to say
[1:41:28]
what are we taking off our plate. You
know, we talked this time last year
[1:41:32]
about TOD and recodification. I was very
vocal with let's get the recottification
[1:41:38]
done. Feel good about it. Ask the
questions of what is missing and why do
[1:41:42]
we need to reevaluate form based zoning.
Then start a COD process.
[1:41:48]
um that has got so conflated and we're
off the timeline and there's questions
[1:41:53]
and still concerns if we are going to
move forward with an RFP, what are we
[1:41:57]
taking off Maggie's plate and how do we
answer to the community because you have
[1:42:00]
a bridge that now we're having problems
with and hopefully have a good solution.
[1:42:04]
We have a downtown that has got vacant.
We've not had had any substantial
[1:42:08]
changes to the master park plans. Um
what are we taking off our staff's
[1:42:15]
plate? Because as soon as we start this
process, even though we're going to have
[1:42:19]
the consultants with the county, we
relied on that for this recotification
[1:42:24]
process and that did not save anybody
any time.
[1:42:28]
You know, we will be paralyzed with
right to nose and threats of litigation.
[1:42:33]
So what are we willing to take off
the plate and how do we address the
[1:42:39]
community when they say you're saying
that right now you need to be doing
[1:42:43]
recodification to and save when we have
these other outstanding projects. So, I
[1:42:48]
I just want to kind of publicly voice
the same concern I did last year on
[1:42:52]
being thoughtful, being rightsized for
our burrow, and being able to
[1:42:56]
demonstrate that we're listening to our
community and we're doing things that
[1:42:59]
they can see that are tangibly
increasing their quality of life.
[1:43:03]
» So,
>> I want to pick up on that cuz that's a
[1:43:06]
good point. Like I think one of and this
is one of the reasons why I felt
[1:43:10]
strongly last year and still do that we
should hire that we should bring in
[1:43:14]
expertise
um to manage the RFP process to be a
[1:43:18]
single accountability point. I felt
strongly in December that that that we
[1:43:23]
we shouldn't try to do it in-house, but
we should do that specifically because I
[1:43:27]
thought that there was too much on your
plate and that we would actually have a
[1:43:30]
single accountability person to both
help us um have the expertise to design
[1:43:35]
the RFP in a way that puts us in a best
position going forward. Um then also
[1:43:41]
helps us manage the engagement process.
I really appreciate the admiral optimism
[1:43:45]
about the uh the six months. I don't
know that I carry optimism, but I really
[1:43:50]
love it. [laughter] Um, but like but
have someone throughout that process
[1:43:54]
that is actually um that that is that
has taken that work off of your plate
[1:43:59]
and then on the back end because they've
been involved through this entire time,
[1:44:03]
they're going to be able to help in a
good position to help us score things
[1:44:06]
and and provide us professional
expertise. So, I felt um pretty strongly
[1:44:11]
about that. And I think that like the
one of the best aspects of this is
[1:44:15]
getting to a position where Safe Mine
isn't on your plate at all. Right. That
[1:44:19]
is like that's what we're heading
towards. Um what what I don't want to do
[1:44:24]
is put you back in a position where you
and the rest of of our staff are having
[1:44:29]
to actively manage manage um say mine
for the next forever and and having to
[1:44:37]
um rearrange the CIP to write grants and
all of these other things. I think we do
[1:44:41]
have like a there's an intensive moment
ahead of us, but we're heading towards
[1:44:46]
something that will really uh
potentially offer beautiful
[1:44:50]
opportunities for a community, hit a
bundle of needs, take this off your
[1:44:54]
plate, retain ownership of it, and I
think that there is a a clear way to to
[1:44:58]
get to that through, you know, a very uh
structured and important process.
[1:45:06]
So Maggie, why don't you talk about
your workload and whether it makes sense
[1:45:10]
to bring in a consultant like I suggest?
>> Yeah. What you would take off?
[1:45:17]
» Do you want to say
a spot? Yeah,
[1:45:21]
» we can talk more.
>> Why don't you think about a response? I
[1:45:24]
mean I definitely agree that um with the
idea of bringing outside expertise in to
[1:45:32]
do this our school process um and I
think whatever you know nominal money
[1:45:39]
that we pay for that we will get that
back in dividends in terms of removing
[1:45:44]
the cost of the buildings removing the
risk of the buildings uh and bringing a
[1:45:50]
long-term solution for this which really
has been like a albatross around their
[1:45:57]
neck for for you know almost a decade
now. So um I think it will [laughter]
[1:46:04]
pay like
it it's money well spent basically. Uh
[1:46:09]
and I I completely agree that we need
that's the route we need to take and we
[1:46:15]
need to move forward. And we also need
to recognize that the longer we wait on
[1:46:20]
this RFP process, the the higher the
cost and the higher the risk is for the
[1:46:26]
burrow and we have to take that into
account.
[1:46:32]
» I I agree with that. I'm really eager
I'm really eager to be done with this
[1:46:37]
property as as it exists in relation to
the burn now and I think we should move
[1:46:44]
to RFP as soon as possible and and the
hiring someone
[1:46:49]
seems very reasonable seems very seems a
lot very straightforward
[1:46:55]
uh interested in the manager's comments
as whether that ads or subtracts work um
[1:47:02]
uh I mean we just had a another
presentation that that contemplated
[1:47:07]
giving her a lot more work in terms of
writing a lot of grants. So,
[1:47:13]
you know, I'm not sure which is which is
asking more from the manager which is
[1:47:17]
which is uh alleviating some of the some
of the work. Um but definitely long-term
[1:47:25]
it seems to be on the alleviation side.
So, you know, I uh I would certainly
[1:47:32]
like to see this done
while I'm alive. [laughter]
[1:47:41]
» My question was, what are we
individually going to take
[1:47:44]
[clears throat] off our chefs?
>> I What I'm saying is that I think
[1:47:48]
I think what I'm saying is I think this
does represent taking something off of
[1:47:52]
her plate. Um and taking something off
of all of her plates. you know, it's
[1:47:57]
something we've wanted to do for a long
time. It's something we are have
[1:47:59]
articulated as a council, you know,
since day one that I've been on council.
[1:48:04]
Um, and I I don't want to see this get
bumped another four years or, you know,
[1:48:10]
or whatever it is. Um,
>> yeah. Okay. I'm sorry. I don't mean to
[1:48:16]
» No, I think Okay.
>> I I think two two basic points. I I mean
[1:48:20]
I agree that
if we're going to do this we should be
[1:48:24]
outsourcing the proposal unless unless
May test says no actually that turns out
[1:48:30]
to be more complicated for her but I
suspect she's not going to say that. So
[1:48:34]
I I would actually say I would take the
probably the most forceful position say
[1:48:40]
I would only agree to to proceed
in relatively short order if we agreed
[1:48:47]
to have [clears throat] engage an
outside consultant to do it. Um, and I
[1:48:52]
think it's, you know, it's
short-term pain for long-term gain,
[1:48:57]
right? The dividends will pay out the
sooner this property is disposed of.
[1:49:02]
Now, having said that, I I'm a little
concerned about the scope of the RFP and
[1:49:08]
whether that moving quickly creates a
problem for us because if
[1:49:15]
depending on how the 4B and 5A
discussions actually play out,
[1:49:22]
for me at least, will inform my views of
how much and to what extent
[1:49:31]
that property
affordable housing or workforce housing.
[1:49:36]
I want to say workforce housing because
affordable housing is not really
[1:49:40]
appropriate term. You know, the need for
that on that property, you know, if it's
[1:49:45]
going to end up that we end up with a
solid plan for that kind of development
[1:49:52]
in 4A and 5B and elsewhere in the world.
You know, we haven't even talked about
[1:49:57]
other places where that kind of
development could take place.
[1:50:02]
To me, that's going to inform
the prioritization of the RFP. So, I'm a
[1:50:08]
little concerned that until we finish
having the discussion, the zoning
[1:50:12]
discussion at least in regard to 4 A 5B,
if not the broader one,
[1:50:19]
that
we're acting a little bit prematurely in
[1:50:23]
terms of deciding what what we want, if
that makes sense. But that's not to say,
[1:50:31]
right? I I again, if it's a six-month
process, we may have finished that four
[1:50:37]
4 A and 5B process by then. But I I do
share Cindy's concern that we've, you
[1:50:43]
know, we thought we were trying to keep
these things separately tracked and they
[1:50:47]
definitely have not been. Um, and so I
feel like we're falling over each other
[1:50:52]
at every step when we're talking about
these big issues and it would just be
[1:50:56]
nice to be sort of finish something
before we start the next thing.
[1:51:01]
» So just just in terms of the timeline
for those, our expectation is to have 5B
[1:51:06]
in front of council by the end of the
year either in November or December. Um
[1:51:12]
4A is going to be a while. Um, there was
requests for more information and just
[1:51:17]
the way planning commission is
scheduling their time, they're not going
[1:51:20]
to be able to get through everything
until
[1:51:24]
next year. So, we will have 5B by the
end of the year. I
[1:51:30]
» have 5B before us, but it may not be by
the end of the year. Yes, it may not be
[1:51:36]
approved. I believe we should vote on
it. I I would like to see a resolution
[1:51:40]
to 5B one way or the other by the end of
the year. we need to make a decision and
[1:51:43]
move on. The 4A is going to take longer.
So this process would the four we would
[1:51:49]
still we would not have made our final
determination about 4A um while this
[1:51:54]
process proceeds if it goes along the
timeline I'm talking if we start working
[1:51:57]
on the the uh if we start working on the
RFP now we will still have 4A
[1:52:02]
» at some point in the future.
>> That's a concern. I'll just express it
[1:52:06]
as a concern.
>> Okay.
[1:52:08]
» Not a deal breaker but a concern. Mhm.
>> Uh I have a question and then a comment.
[1:52:13]
Um the question is u we're talking about
4A and 5B. Uh this property sits in 3B.
[1:52:22]
Do we have
>> cuz Mike brought it [clears throat] up?
[1:52:23]
» No.
>> I'll finish my question. Do do we have a
[1:52:28]
plan to talk about zoning in 3B or or is
that not something we're going to
[1:52:35]
discuss? It's a Okay, so we have a
long-term plan. It is not on our
[1:52:41]
immediate agenda, but um since this
property is burrow owned, the zoning is
[1:52:48]
more flexible. The burough can determine
what can be built on it regardless of
[1:52:53]
the zoning. So,
>> but understanding that has an impact for
[1:52:57]
the people who live in
>> of course I mean and any anything that
[1:53:01]
we allowed on this property would not
necessarily be allowed on the rest of
[1:53:04]
the 3B. So we're not whatever we do here
is not open up the rest of 3B to similar
[1:53:10]
um building options.
I think at our our last meeting when we
[1:53:15]
were discussing like the missing middle
typologies, we asked planning commission
[1:53:20]
to like look
>> why at the missing middle which includes
[1:53:24]
[laughter]
[1:53:27]
» we asked them to be looking at lot sizes
and allowing row houses and cottages and
[1:53:34]
» staff standards. So, we asked them to
look at those throughout the other
[1:53:37]
districts, but that's going to take
more. I mean, this will be okay.
[1:53:40]
» Sometime next year, they'll get to that.
>> Thank you. Uh, my comment is uh I
[1:53:46]
recommend that we table um consideration
for an RFP. I know this will be
[1:53:51]
unpopular with people, but my
recommendation is that uh we table it.
[1:53:57]
My my rationale is a couple of points.
Um the uh I wasn't here in December. I
[1:54:04]
wasn't on council in December when this
was previously discussed. I see
[1:54:08]
information about community feedback in
uh but I don't see any documentation of
[1:54:13]
community feedback or that was collected
or not. Uh so I don't have that
[1:54:17]
available to me. I just see a summary of
um community feedback. Uh I'm I
[1:54:24]
mentioned before, I'll mention again
I've been only on council for a short
[1:54:27]
period of time and I've seen us make
mistakes when we rush and uh and it
[1:54:33]
sounds like we're we're pushing to uh
push this through when there are other
[1:54:39]
things that we're working on. Um and I
am concerned that uh we're going to push
[1:54:47]
hard. we're going to make mistakes and
uh and those are going to have
[1:54:51]
long-lasting consequences as Jim
mentioned perhaps for 100 years that we
[1:54:55]
might not have to worry about this
property. So I I just want to state very
[1:55:00]
firmly and strongly uh I recommend that
we do not vote today to move forward
[1:55:07]
with uh preparing an RFP for this. Thank
you.
[1:55:12]
» Well, I was not planning to vote on
this. I was just planning to get a sense
[1:55:16]
of council and then we will have a vote
when we have a a formal action to take
[1:55:20]
which will probably be to authorize
hiring consultant or such. Um but and
[1:55:26]
I'll also note that the community
feedback that is anticipated is we
[1:55:30]
present a draft RFP to the community,
they offer comments on it and then we
[1:55:35]
incorporate that in any final RFP. So
sorry I'm referring to the community
[1:55:40]
feedback that was cited in the document
um from the December 2025 meeting.
[1:55:46]
You're talking about the prior survey
that we
[1:55:49]
» did we did a uh we pulled together kind
of like the various themes council
[1:55:54]
members for all provided feedback on it
that was incorporate but your point is
[1:55:58]
» it's called community
>> feedback
[1:56:03]
processes on the website
>> yeah for you I appreciate that
[1:56:10]
» I just I agree with all of you but say
for this was the first topic we explored
[1:56:15]
nine years ago
I think it's naive for us to say we're
[1:56:18]
going to hire a consultant and it's
going to alleviate things to do from our
[1:56:23]
office.
[1:56:26]
» Yeah. And I think we should demonstrate
um that we have incorporated our
[1:56:32]
community's feedback as we go through to
I would feel much more confident as an
[1:56:36]
elected official to say look we
collected feedback and this is how we
[1:56:40]
heard you and we implemented that as we
go through a thoughtful process to
[1:56:45]
continue maybe we take off and say you
know what we're going to back burner
[1:56:49]
that if the [clears throat] will council
is concentrating moved to an RFP but I I
[1:56:55]
want to demonstrate straight to the
people that elected us that we can get
[1:56:58]
something done. [laughter]
>> I mean, you're laughing. I'm like,
[1:57:02]
seriously, like the park plan, you know,
the the bridge in downtown we have very
[1:57:06]
little control over. Um, what can we
demonstrate and what has to come off?
[1:57:10]
You know, maybe it's the sidewalk
maintenance and vegetation, maybe it's
[1:57:13]
the traffic calming, cuz to think that
hiring a consultant to do this RFP is
[1:57:17]
going to take work off of your plate, I
think, is naive. And so, correct me if
[1:57:22]
I'm wrong, but I mean, I know Emily
spends weeks of her time doing right to
[1:57:27]
know requests
that a consultant would not be legally
[1:57:31]
able to do.
>> Is that correct?
[1:57:33]
» Yes.
>> Okay.
[1:57:35]
» Um, so first of all, I appreciate you
all being mindful of my time. I do want
[1:57:40]
to say it's not just my time. It is all
staff's time. So, I'm not solely working
[1:57:44]
on this. and I want to recognize the the
efforts of Emily and the rest of our our
[1:57:48]
staff and and all of the the support
that they provide to the burrow. So, um
[1:57:53]
I'm just very appreciative that that I
have a council who is mindful of of our
[1:57:57]
workflow workflow and workload.
Um so certainly hiring a consultant for
[1:58:06]
this would be the preferred option. Um,
I don't have the time or expertise to
[1:58:12]
really devote to this effort. Um, you
know, to Council Member Stratton's point
[1:58:18]
here, we don't want to rush through this
and make mistakes. Um, having a
[1:58:23]
consultant who does this for a living,
they would have much more uh
[1:58:27]
sophisticated means of analysis, of
research, of of comparison. Um, so I
[1:58:33]
would certainly recommend that we do
that. Um, it doesn't necessarily
[1:58:37]
alleviate all of the scope of work. um
it does still add a substantial amount
[1:58:41]
of work because the finding of the
consultants and working with them on
[1:58:45]
drafting uh the RFP and getting the
coordination that that entails that's
[1:58:50]
another kind of large project that that
we would undertake. So it does add work
[1:58:55]
to the staff. Um it doesn't add as much
work though as if we were to be doing
[1:59:01]
this by ourselves.
I will say though in terms of
[1:59:05]
prioritization of projects, we kind of
put Seabine a little bit on the back
[1:59:11]
burner because we had a full complement
of tenants. Um other priorities came up
[1:59:16]
this year um that took our focus away
from this. However,
[1:59:22]
given that we now have lost all but
essentially one tenant, um one tenant
[1:59:29]
being Wonders Daycare and the Wonders
admin. So, two tenants but under the
[1:59:34]
same umbrella. Um, Lavner still has an
active lease, but they're not actively
[1:59:39]
using the sites. Um, so we don't really
have as many tenants um as we used to
[1:59:46]
and we have not yet found tenants to
backfill those spaces. So when we talk
[1:59:50]
about Sabbine being a revenue generating
property or at least a revenue neutral
[1:59:54]
and that the money that we're spending
on the maintenance of the building is
[1:59:58]
being offset by the uh rental income
that we're receiving, that number is
[2:00:03]
going to flip next year. So if we don't
get new tenants in, the building is
[2:00:08]
still going to require certain amounts
of maintenance. And now we no longer
[2:00:11]
even have the rental revenue to make up
for that. So this is now amplified as a
[2:00:17]
priority project for the burrow, for our
staff, for our financials. Um, so I do
[2:00:24]
recommend that we do something with this
regardless of what whatever council's
[2:00:29]
will is. We do need to make a decision
on this and I I do not recommend that we
[2:00:34]
push this off any longer because we are
very quickly turning into a situation
[2:00:39]
where we will now uh be financially
constrained by this property. Um, and
[2:00:45]
and I don't want to get us into a
situation where
[2:00:48]
we we en encumber ourselves with
something where it's too late to make a
[2:00:53]
decision that we otherwise
[clears throat] may have wanted to make.
[2:00:55]
So, I put that out there just to um
express the the the pace at which I
[2:01:02]
think or the prioritization I feel of of
the large project. So, we have the
[2:01:06]
bridge going on. Um, so I'll be working
with our consultants on uh pivoting to
[2:01:12]
that option three. So there'll be
updates coming um on that. Um the
[2:01:18]
recottification efforts, I know we still
have some more discussion. Um we have
[2:01:22]
other smaller ordinances that we're
working on. We have the budget season is
[2:01:27]
kicking off and I'll be giving a
overview of our our scope and timeline
[2:01:32]
um tonight. So that's obviously going to
be kind of a big thing for the next
[2:01:35]
couple of months.
Um we've got some staffing turnover as
[2:01:39]
well that we're dealing with. So there's
a lot on the plate. um in terms of
[2:01:43]
things coming off the ordinance work is
is
[2:01:47]
you know certainly something that um
requires a lot of coordination and
[2:01:51]
effort. Um we do have our consultants to
help with that. Um, so in terms of kind
[2:01:57]
of that prioritization,
it's it's hard to make those judgment
[2:02:01]
calls about what needs to come on and
off. But really the main point what I
[2:02:04]
want to make tonight is that 2011
binding needs to be prioritized because
[2:02:09]
we are we are now at an inflection point
more so than we ever have been and we
[2:02:14]
need to proceed with a path forward.
>> Okay. I'd like so we're not going to
[2:02:19]
take a vote tonight on this, but I'd
like to propose that you bring us um
[2:02:25]
more
[2:02:28]
you bring us more details about hiring a
consultant. Uh
[2:02:33]
and that I I heard a several council
people say they'd like to hear more
[2:02:38]
information about Jeff's proposal. So I
think that the next step there would be
[2:02:43]
to bring in um the Lower Marian
Conservancy, which would be a partner
[2:02:49]
for any kind of grant application. I'd
like to hear from them. So this can be
[2:02:53]
like a private meeting to start with or
potentially a presentation to council.
[2:02:58]
But I think that that would be the
appropriate step there because our
[2:03:02]
concerns are about the the concerns that
I heard were primarily about funding and
[2:03:06]
the Laurian Conservancy has offered to
work on grant funding as part of the
[2:03:12]
proposal and uh you know they've written
grants with us before and we've worked
[2:03:16]
with them and it's been a very helpful
process. So
[2:03:20]
I'm hearing that we proceed with both of
these steps and then we'll need to vote
[2:03:23]
on one or the other pretty soon.
Um, so do we, so like one of the ways to
[2:03:30]
do that is rather than having them spin
their wheels, which is incorporate
[2:03:36]
just the concept of that into portion of
the process where we were talking about
[2:03:43]
all of these other things and then that
can be handled rather than like now
[2:03:48]
we're like having kind of two parallel
things occurring in process where this
[2:03:54]
where like the partnership
kind of piece may not even work for us
[2:03:58]
to begin with and rather than forcing
that energy, we can incorporate it into
[2:04:02]
the process in the way that I was
describing earlier and that might just
[2:04:06]
solve for that.
>> But that doesn't meet refugeia's
[2:04:08]
timeline. Is that up to
>> It sounds It sounds like nothing might
[2:04:12]
at that point. But if we're actually
trying to get this started, then I think
[2:04:17]
that puts us in the best position to
potentially meet that time.
[2:04:20]
» I just wonder I mean I would ask this is
such a creative idea. I would hate for
[2:04:25]
kind of bureaucracy and well this is how
we always do it to not at least explore
[2:04:29]
what is really an entrepreneurial
innovative idea and it sounds like you
[2:04:34]
and the conservancy and even the county
have had some really substantive
[2:04:37]
conversations. I think in a month we're
not going to make any decision but to
[2:04:42]
have another bite at the apple to
address some of those questions with the
[2:04:46]
good that we might see and save mind I
think it would be worth it. Joe, Mike.
[2:04:52]
» Yeah. I mean, I
I don't want to say again, my my only
[2:04:59]
concern about this is whether we have to
I'm on check with John whether we have
[2:05:05]
to do it through the RFP process. We may
have to um legally I'm not sure. Um not
[2:05:12]
if he's a tenant. Right.
>> Right.
[2:05:14]
» I mean, if it's a pure tenency, I don't
think that's an issue. But if there's
[2:05:18]
going to be any sort of
land transfer and you know I feel like
[2:05:24]
we're at the beginning of the
discussion, right? Like I always say the
[2:05:28]
devil's in the details, right? I think
there's a lot of great ways there's sort
[2:05:32]
of I'm already spinning about land
trusts and things like that. I mean it
[2:05:36]
may be that we can,
you know, set up a land trust and and
[2:05:41]
have the land trust essentially buy the
property from us over time.
[2:05:46]
um you know and where we're not
responsible for. So I feel like we're
[2:05:51]
sort of at the beginning of the
discussion, not at the end. And
[2:05:57]
I guess my my my you know, all this
makes me think like the RFP process we
[2:06:02]
should start in January after budgeting
after we know what happens with 5B.
[2:06:06]
Again, from my perspective, I don't know
what I would want the RFP to look like
[2:06:13]
until I know what our the rest of our
zoning looks like and whether we have
[2:06:18]
been able to fairly and fully
accommodate the missing middle, which if
[2:06:23]
we don't, 2011 say to me is a prime
space to address that issue. Maybe maybe
[2:06:30]
we say we do it all over town, but
you know, again, Joe, I I echo Joe's
[2:06:36]
concerns about I feel like we've been
rushing through stuff
[2:06:41]
and quite frankly giving a month of
public input on 2011 when we know it is
[2:06:47]
a high. I mean to me that's just not
realistic that you know it's a high
[2:06:55]
visibility item
and you know we've been previously
[2:07:00]
criticized about how we got that public
comment the first time around. I wasn't
[2:07:04]
on council back then but I share that
concern because of the way that was
[2:07:08]
structured. Um and so I want to make
sure that
[2:07:13]
for something that's going to go for
hopefully a hundred years that we do it
[2:07:17]
slow. We do it deliberate and we do it
right. And I don't think that's,
[2:07:22]
» you know, [laughter] I asked Joe for his
opinions.
[2:07:26]
» I just want to express Megie, I
appreciate that uh everything that you
[2:07:30]
described and also that the urgency is
um that we don't you know we have two
[2:07:35]
tenants right now uh under one umbrella
and um and that's creating some urgency
[2:07:42]
and there may be an opportunity for
another tenant. Um uh so it it it um you
[2:07:49]
know if the lack of tenency is the
reason for the urgency um maybe it makes
[2:07:55]
sense to you know really explore if
there's a willing able tenant who's very
[2:08:00]
interested um to help address that gap.
Is there any way I could just say
[2:08:04]
something because I feel I it this take
two seconds but I feel like I'm an
[2:08:09]
example of the urgency that popped up in
in a positive way. Like Maggie and I
[2:08:14]
kind of talked like I was looking at the
property and then there was like kind of
[2:08:18]
an increase in the schedule for me to
come in and present my idea. And I feel
[2:08:24]
like it's I mean like I presented
something that I feel is has tons of
[2:08:28]
potential but is incomplete in the sense
that like I just haven't like I
[2:08:32]
literally threw together like I I talked
with um with Moren. We started getting a
[2:08:39]
lot like some like some energy going
around the like grant opportunities.
[2:08:44]
There are some like larger funders that
that look at at public space like this
[2:08:50]
that there is opportunities. It's not
it's not and and this isn't just like a
[2:08:54]
a project that started off for graffiti,
but it's really for the community, too.
[2:08:59]
And I felt like I'm I'm extremely
appreciative to come in and present
[2:09:03]
tonight, but I did feel a bit rushed.
And and so, but I also don't think it
[2:09:08]
needs to take forever. And I really
appreciate like right when you and I
[2:09:12]
talked I was kind of just like I put
together like kind of what I could some
[2:09:16]
of what when when I was away in Maine I
was just like I was like kind of
[2:09:19]
scrambling to like get something that I
felt at least decent about to like come
[2:09:23]
in and present. like I do feel like
there's
[2:09:27]
like there's a lot of potential and just
to having a bit of time to like flesh
[2:09:33]
flesh that out especially the funding
opportunities
[2:09:36]
have like kind of to Fred's point like
having the opportunity to come back and
[2:09:40]
and present that in like [clears throat]
more fleshed out with Moren to have that
[2:09:45]
opportunity I feel like we can make a
lot of headway and I I feel like I could
[2:09:48]
come back in here with something really
digestible to have that conversation cuz
[2:09:52]
I agree like and this has been humbling
like understanding a bit more about the
[2:09:57]
challenges of the the deferred
maintenance, the the level of the the
[2:10:02]
amount and also just like how much this
it like I just I appreciate that and so
[2:10:08]
um but equally it'd be great to come
back in here and and and look at a
[2:10:13]
solutionoriented approach to this that
um it could work for everybody. Right.
[2:10:19]
But first, we have a lot of other
>> I do want to mention one other piece
[2:10:22]
though because it was it was you know it
was brought up like should we wait till
[2:10:25]
next year? Should we not? And I think
that like I do think that like part of
[2:10:32]
part of why I thought we should got
started last year. Why I think we should
[2:10:36]
get started in terms of hiring a
consultant now is specifically because I
[2:10:40]
expect this process is going to take
much longer than 6 months.
[2:10:46]
As much as I love your optimism, it's
going to take a while because it will
[2:10:49]
necessarily take a while in order to do
all the things. And every kind of like
[2:10:54]
time we push that timeline back 3
months, we're pushing this broader thing
[2:10:58]
out there back 3 months, back 5 months,
and then it becomes impossible to like
[2:11:04]
even get all of the information and do
workman like so we can take our time so
[2:11:09]
we can we can really make a wise
decision and do all these things. So
[2:11:12]
that's why I think that even if folks
are coming back, we should also be
[2:11:17]
identifying some potential consultants
to help so that we're not continuing to
[2:11:22]
push that.
>> Okay, that that is what I'm hearing. We
[2:11:24]
are we are we got a lot of other items
tonight. We are not making we're not
[2:11:27]
voting on anything tonight. So I think
we should proceed. Uh I'm hearing
[2:11:32]
significant support for two different
positions. Uh I think we need to
[2:11:36]
continue to explore these and to the
point where we have a vote. I think
[2:11:40]
we're going to need to have a vote to
clarify our position. Um because I agree
[2:11:46]
with Maggie's position that
the time has come to move on. Uh so
[2:11:55]
all right. Do you is that clear enough?
>> Yes.
[2:11:59]
» Okay.
Uh I'd like to move on to the next
[2:12:02]
discussion item then
[2:12:07]
downtown tree maintenance.
[2:12:11]
All right. So,
get to my memo here.
[2:12:20]
Um,
so the burrow has an ordinance that
[2:12:25]
defines that all street trees,
also called shade trees,
[2:12:31]
um, that extend within the public right
away are the maintenance responsibility
[2:12:36]
of the property owner on whose property
that tree sits.
[2:12:42]
This extends to both commercial and
residential properties. The ordinance
[2:12:46]
doesn't make a distinction between the
two. And
[2:12:51]
what that means practically is that all
of the street trees on Hammerford Avenue
[2:12:58]
and in our downtown generally
are then the responsibility
[2:13:01]
[clears throat] of each individual
property owner um of however many
[2:13:07]
properties that may be. So some of them
are owned by the same person, some of
[2:13:10]
them are owned by different people. Um
there is there has been in the past a
[2:13:16]
practice that the burrow has maintained
these trees in a uniform manner um using
[2:13:22]
burough funds uh to do so. This is
because there is a vested interest in
[2:13:30]
keeping a uniform maintenance of those
trees. Those trees are hugely [snorts]
[2:13:36]
uh impactful on the streetscape of our
downtowns. really contribute to the
[2:13:41]
character of the downtown.
But as I understand it in speaking with
[2:13:46]
our director of public works is that
this has not been done in a uniform
[2:13:51]
manner by the burrow since about 2017 or
2018. Um the trees have gotten uh older
[2:13:58]
and are in need of some pruning. Um so
the question really that we wanted to uh
[2:14:05]
pose to council is that um this being
you know it's within the right of way so
[2:14:12]
it falls within the burough's
jurisdiction. Uh the ordinance though
[2:14:16]
defines street trees in the right of way
as being the property owner's m
[2:14:19]
maintenance responsibility.
Um but should the burough wish to take
[2:14:25]
on that maintenance responsibility it
would add additional cost to our tree
[2:14:29]
maintenance budget. Um, but it would
provide the benefit of maintaining the
[2:14:34]
trees in our downtown in a uniform way.
So, the question really is, uh, the
[2:14:40]
trees are in need of some repair. I
actually had, um, a conversation with
[2:14:44]
one of the larger property owners just
this week, um, who expressed, uh, some,
[2:14:50]
um, concern that he didn't realize that
this was a a maintenance responsibility
[2:14:56]
that was born by the property owners. um
and just had some questions about what
[2:15:00]
that means in terms of liability. Um the
proposal that we're putting forth is not
[2:15:05]
that we would not that we the burough
would then take u maintenance
[2:15:08]
responsibility for everything about the
tree. Uh it really just to provide some
[2:15:12]
uniform um pruning and periodic
maintenance. Um so if we were to do that
[2:15:18]
uh we would just hire a tree contractor
to come and do all of the trees. Um and
[2:15:22]
Jeff, this was for avenue.
There's two trees up forest that are
[2:15:29]
larger, two trees on Essex that are
larger, and two or three of them north.
[2:15:36]
So in total around about 20 trees.
>> So [clears throat] we're looking at uh
[2:15:42]
that work would be about $5,000. Um they
would need to be maintained about every
[2:15:46]
3 to 5 years. Uh so if this is something
that we want to undertake, we would then
[2:15:51]
um share this information with the
property owners to let them know you
[2:15:55]
know we will be maintaining these trees.
However, that does not mean that we are
[2:15:59]
taking full ownership of these trees. So
if they are to be damaged, if they need
[2:16:04]
to be replaced or there's other larger
maintenance needs with them, um you
[2:16:09]
know, sidewalk repairs, those are all
still legally the maintenance
[2:16:13]
responsibility of those property owners.
um and we would simply um you know uh
[2:16:19]
reiterate that to them or just provide
explanation for that. So this would be
[2:16:24]
um something that we would need to
coordinate with our solicitor to make
[2:16:27]
sure that we uh draft this language
appropriately to clearly define
[2:16:32]
responsibilities and what we're offering
to take on versus what would still
[2:16:36]
remain the the responsibility of the
property owner. Um, but rather than make
[2:16:42]
a unilateral administrative decision
regarding that, I did want to bring that
[2:16:46]
before council because this does have
implications on our budget.
[2:16:50]
» Okay.
[clears throat]
[2:16:53]
» Who who pays for this? Do do we do the
work? Can we charge the property owners
[2:16:58]
or
>> So, the proposal is that we would do the
[2:17:01]
work and we would pay for it. The other
option is we could do the work um and
[2:17:06]
then lean the property owners um or send
them invoices um but that is not what's
[2:17:12]
being proposed. What's being proposed is
that we would uh incorporate this just
[2:17:15]
as part of our budget.
>> I would just support
[2:17:22]
not charging or putting a lean to the
property owners at this point given the
[2:17:27]
vacancies downtown and you know they are
struggling so much. We're trying to
[2:17:31]
control what we can control this we can.
I mean 5,000 I think we can find that in
[2:17:35]
the budget and let folks know we're not
committing to this in perpetuity.
[2:17:40]
However, we want to recognize that with
the bridge out and downtown vacancies,
[2:17:44]
we don't want to add this to what is
already a struggle in your storefront at
[2:17:49]
this time. Can we put that language in?
Um yeah, and I think that's that's very
[2:17:55]
much kind of the spirit that this is
being undertaken in as we care about our
[2:18:00]
downtown. We care about um you know
providing um assistance where where
[2:18:06]
possible.
Um this has been something that we've
[2:18:09]
done in the past, but we've never
formalized it. And the the other intent
[2:18:14]
as well is that um if we proceed with
this, I do want to make it clear that
[2:18:21]
we're not then taking that ownership. So
I I do want to be very intentional about
[2:18:26]
this and clear as to kind of we're we're
doing this as a matter of courtesy.
[2:18:32]
We're doing this as a matter of interest
in our downtown. we're doing this as a
[2:18:37]
matter of um kind of a a good uh good
neighbor sort of a thing. Um there's a
[2:18:44]
lot of great benefits to that. Um the
property owners benefit from this
[2:18:47]
because then they wouldn't have to spend
the money to maintain the trees
[2:18:50]
themselves. The trees are maintained in
a way that supports their their
[2:18:54]
long-term health for our downtown. Um
but again clearly creating that um that
[2:19:00]
that division for this is what we're
doing to help out. But we're not doing
[2:19:05]
this in a way that would mean that we
would then in perpetuity take ownership
[2:19:10]
of these trees. We're simply taking
periodic maintenance of these trees on
[2:19:15]
ourselves.
>> Two one question and one nit um question
[2:19:20]
is what happens if the property owner
says I don't want you touching my tree?
[2:19:24]
I mean we can't we can't say we are
going to do this right
[2:19:32]
» but only but only if it's a health or
safety issue right if it's I mean I
[2:19:38]
guess we can say if their trees are not
being properly pruned I guess it's a
[2:19:42]
safety issue the other thing I guess
then is in our communication I I also
[2:19:47]
think and we should probably talk to
John about this
[2:19:52]
I I want to make sure that we're not
undertaking potent potential liability
[2:19:55]
if somebody if the tree then falls and
somebody claims that we pruned it
[2:19:59]
improperly. I would like to put that
indemnification on the property owner to
[2:20:04]
say you are still liable for this
condition of this tree no matter what.
[2:20:08]
And if we do this work, you're going to
indemnify the burrow if any third party
[2:20:12]
claims against us because of our
pruning. You know, a basic
[2:20:16]
indemnification. I think we need that.
This the cost isn't a lot, but I don't
[2:20:21]
want to create a I don't want to
unnecessarily create a risk of exposure
[2:20:25]
to the burrow if you know the tree falls
down in a storm and they're going to
[2:20:29]
claim we mis pruned it. Not that Jeff
would ever mispr.
[2:20:35]
But [laughter] but I think we need to
make sure we have those legal
[2:20:38]
protection.
>> So yeah, similar concern about what if
[2:20:43]
they what if they deny like you can't
prune my tree. Um but um the downtown is
[2:20:51]
I think it's the only area where we
mandate plantings you know in the verge
[2:20:55]
or in the street you know um and we
require that trees not only be
[2:21:01]
maintained there but also uh be replaced
if they're if they're damaged or they
[2:21:07]
die. Um
uh
[2:21:12]
the shade trick commission
they have been
[2:21:18]
I don't know if you remember this but
years ago we did task them with coming
[2:21:21]
up with a downtown crew replacement and
maintenance plan.
[2:21:25]
» Mhm.
>> They've back burnered that forever. They
[2:21:28]
have a lot of lot on their plate, you
know, but this is one thing they have
[2:21:33]
been working on and it might sort of
behoove us to fold something like this
[2:21:38]
into, you know, future maintenance. I I
mean, I agree that we can do this now
[2:21:42]
and it's not a great cost. $5,000
over 5 years doesn't seem like that
[2:21:48]
much. Um uh since this is an area where
we mandate trees be planted and
[2:21:53]
maintained, it seems natural that we
should you know codify that in some way
[2:21:58]
that we you know we articulate what is
our responsibility or what is you know
[2:22:02]
what kind of action can we take when
it's time to maintain or improve them.
[2:22:08]
Um
the
[2:22:12]
question I had is some of these uh trees
that are in the downtown area, they have
[2:22:17]
lights in them, you know, that the shop
owners have put up. Some even have
[2:22:21]
electrical boxes in them. Are we
contemplating doing anything like that
[2:22:26]
like removing them or asking them to
remove them or shift them or
[2:22:32]
» The electrical boxes were all taken out.
>> Oh, okay.
[2:22:36]
That was back when when Samantha was
here. Um that was a catch by Pico. They
[2:22:42]
didn't authorize that, so they came out.
And then the string lights that are in
[2:22:47]
there used to be plugged in by the
burrow when we when we would hang up our
[2:22:53]
wreaths and stuff on the lights. Um we
have not plugged them in in years. So,
[2:23:00]
you know, each year you say we're going
to unravel them and take them down and
[2:23:04]
just be here that that do it.
>> Jim, can I ask you a question?
[2:23:09]
» It's probably for Jim, Jeff, or Jeff
even.
[2:23:13]
» Um, do we qualify as a level one
arburetum that tree American and is
[2:23:19]
there any funding available because of
that distinction to property owners?
[2:23:24]
» Yeah. Tree city.
>> Yeah, the tree city. And
[2:23:28]
» I don't think we get any funding
directly from Tree City, but maybe
[2:23:33]
» you know there's no direct funding. It's
actually the opposite. We have to spend
[2:23:39]
two bucks per resident to maintain that
and that is qualified with tree
[2:23:46]
prunings, tree takedowns, tree
plantings.
[2:23:49]
» Okay.
I I I've been researching like uh Narn
[2:23:54]
qualifies as a a level one arburetum
through ARNET which accredited the
[2:24:00]
Barnes Foundation among others like
Barnes Foundation Arburum and when you
[2:24:05]
get accredited one one of my questions
was actually how does this uh I I I met
[2:24:11]
with the Chry Commission this month to
to kind of talk about this a little bit
[2:24:16]
to see if there's ways to like utilize
that then for available funding to
[2:24:21]
because after the micro burst, right? It
was like this exact scenario where like
[2:24:26]
all these trees came down on p like
privately owned trees came down in
[2:24:30]
public space. You clear them off the
road, but then the land owners are still
[2:24:35]
left with like5$10,000
like tickets to, you know, take either
[2:24:42]
take their tree down or sometimes it's
deferred maintenance of the trees if
[2:24:47]
they're cabled. if there's money that's
put into like preventative care for the
[2:24:51]
street trees or even if they're on
private property. Um, being an
[2:24:55]
accredited arboritum and plenty of
municipalities have gone through this,
[2:25:00]
it it opens up funding opportunities and
also changes the guidelines about how
[2:25:05]
trees that are owned either primarily by
a municipality but then also there can
[2:25:10]
be secondary guidelines for how um uh
property owners can contribute in the
[2:25:16]
same way. So, it's something that can be
further explored. I I'm trying to learn
[2:25:20]
more about it so I can help the Shade
Tree Commission potentially
[2:25:25]
apply. I'm sorry to jump in there, but
it is a pretty cool It's a pretty cool
[2:25:29]
option.
>> It was a direct question. I think that
[2:25:31]
it'd be good for that to keep going
through the Shane Tree Commission until
[2:25:34]
they come to a recommendation and then
it can rise to council.
[2:25:37]
» We were calling it a NAR
[2:25:42]
t-shirt.
>> Yeah. Other concerns about Jeff
[2:25:45]
proposal? Anybody else?
>> I mean, I would just put this under the
[2:25:49]
umbrella of streetscape improvements for
the downtown and I think that's money
[2:25:56]
spent there in terms of
>> Yeah.
[2:25:58]
» Yeah.
>> I'm hearing general approval. It does
[2:26:00]
sound like we want to tighten the the
language a bit. Um, so make sure that
[2:26:04]
» John Walker's involved with the is
comfortable with the
[2:26:07]
» Y. All right.
>> One additional point. Uh there's a I
[2:26:11]
think looking at Google maps looks like
there's a tree on Windsor corner of
[2:26:14]
Windsor in Arbor that that uh I don't
know if that's I don't know if we want
[2:26:20]
to include Windsor or not but it looks
like there's a large tree there. Also
[2:26:24]
just in terms of uh in terms of uh
guidance to staff, um I think you know
[2:26:29]
we want to be very specific about which
trees uh there are trees um uh that go
[2:26:35]
into the parking lot kind of behind um
uh the south side of Narworth or are we
[2:26:42]
considering that we're doing those or I
I don't need an answer but I think we
[2:26:46]
just want to be very specific. This is
the trees along the street um only or
[2:26:51]
what about going into the parking lot
>> the traffic circle how are the trees
[2:26:57]
selected how did you select the trees
>> so face and circle are our trees you
[2:27:03]
know we we own in there we prune in
there you know we take care of those
[2:27:07]
elms you know the trees were selected by
which ones reside in the sidewalk within
[2:27:14]
the right away you know the tree that
you're referencing at the post office is
[2:27:20]
actually like on their front lawn. So, I
think it's just beyond, you know, the
[2:27:25]
right of way there. The only time we
touch that tree there is if it starts to
[2:27:29]
impede with this stop sign there. And
then that's just a quick cut. That's not
[2:27:34]
a horicultural
endeavor. That's we need folks to see
[2:27:39]
the sign.
>> Perfect. Thank you,
[2:27:43]
» All right. Sounds like got approval to
proceed with that plan.
[2:27:49]
» Great. Thank you.
>> All right. [snorts]
[2:27:53]
Um, next discussion item
is the fitness and indoor recreation is
[2:28:02]
uh we lost our parking commission
unfortunately. Uh,
[2:28:07]
so how do we want to structure this?
>> Right. So this is a new format that I
[2:28:13]
would like to introduce um is the table
read. Uh so the table read being
[2:28:19]
something that we would introduce at
work sessions. This is a nonvoting
[2:28:24]
meeting uh for most things and um this
just gives us an opportunity to be
[2:28:31]
deliberate about reading our ordinances,
making sure that everyone has read them,
[2:28:36]
making sure that all questions are
answered, making sure that any edits
[2:28:39]
that we would like to make to them um
have been addressed before they come
[2:28:42]
before council for any formal action for
authorizing authorizing advertisement um
[2:28:49]
or adoption. So the table read is going
to be something that we introduce before
[2:28:53]
we authorize advertisements. Um it can
go through as many table reads as we
[2:28:57]
feel necessary until the ordinance is um
satisfactory so that by the time that we
[2:29:02]
get to our business meetings and we
authorize advertisement and then we go
[2:29:06]
to authorize adoption, we will have
already have vetted all of our um
[2:29:11]
questions, comments, concerns ahead of
time. So then those business items just
[2:29:14]
become uh very um de facto at that point
because it it already would have gone
[2:29:21]
through uh full review um and approval.
So what we're proposing then for tonight
[2:29:27]
is a table read. This is ordinance 1073
fitness and indoor recreation uses. This
[2:29:32]
is actually what we discussed at the
last business meeting in August. So we
[2:29:38]
have made the changes that were
recommended at that meeting. Um I had
[2:29:44]
recommended that we table the movement.
We were going to move to advertise with
[2:29:48]
all of those amendments and I felt that
the amendments were too numerous to do
[2:29:52]
that. So we have made those changes to
the ordinance that is incorporated into
[2:29:56]
the draft that you have before you. Um
[snorts] so really at this point it's an
[2:30:00]
opportunity for us to just take a look
at the ordinance. um make sure that the
[2:30:05]
changes that were recommended at our
August meeting have been incorporated to
[2:30:08]
your satisfaction. If there's any other
changes, we can make them ahead of the
[2:30:12]
the business meeting. Um but otherwise,
this is kind of the opportunity to uh uh
[2:30:21]
get out anything that we want to get out
and and discuss uh discuss the the
[2:30:25]
ordinance. Um and so again for not just
this table read but all moving forward
[2:30:31]
uh once we have then the um the okay at
our work sessions on the table read we
[2:30:38]
proceed then at the following business
meeting for authorization to advertise.
[2:30:42]
So if this passes muster at this table
read then you will see this before us
[2:30:46]
for authorization to advertise at our
September business meeting.
[2:30:53]
» Okay. Thanks for that summary and yeah,
we're hoping this will avoid some of the
[2:31:00]
so more discussion time for some of the
legislation. Um,
[2:31:05]
so we've already seen this a few times,
but uh comments at this point on this?
[2:31:11]
So I I wasn't here obviously at the
business meeting so [clears throat]
[2:31:16]
express I I still think that this rule
for Habford of having the first 12 ft be
[2:31:23]
some other use is unnecessary and um I
[clears throat] just you know we're
[2:31:29]
trying to fill that space in particular
and creating an additional restriction
[2:31:34]
there to me just completely
counterintuitive.
[2:31:38]
I I get that in general the thought
process for Hford is you know you want
[2:31:44]
people coming in and out and you know
not just coming in but we have
[2:31:49]
restaurants that that's not the case um
and other kind types of businesses
[2:31:55]
potentially they're not the case and I
just I I think it's an unnecessary
[2:32:00]
restriction and is
at a time when we're desperately trying
[2:32:06]
to fill those spaces is like I don't
it maybe it's a nice thing to have. I I
[2:32:14]
but I I really don't see the problem
with you walking down a river road and
[2:32:19]
seeing a a bunch of people on a bunch of
exercise bicycles. It doesn't offend me
[2:32:24]
and I don't think we should be zoning
for
[2:32:29]
um uh you know because it doesn't look
nice to see people in sweats or
[2:32:34]
whatever. In fact, I think it creates a
vibe. If anything, you know, more
[2:32:38]
energy, maybe more people will go in and
sign up for classes. Oh, you know,
[2:32:42]
that's like a fun class or there's
[snorts] so and so. I know there's my
[2:32:46]
neighbor. Maybe I'll join that class.
So,
[2:32:49]
that that's my only comment. I didn't
get to say it last month cuz I wasn't
[2:32:53]
here.
>> Well, I actually have the exact same
[2:32:55]
apology in common. Um because we do we
do have businesses that kind of skirt
[2:32:59]
this by you know selling trinkets that
no one ever goes in to actually buy in a
[2:33:04]
storefront. Um and what I would be even
kind of more concerned was you know I
[2:33:10]
think the spirit behind this I'm all
behind. Um however in practice you know
[2:33:15]
I would hate to see a fitness studio
sell a smoothie or a soda cuz we want
[2:33:19]
them to go in and use that fitness plan
and then walk down to get cafe and then
[2:33:22]
walk to Yasu. Like I think the landscape
of retail has shifted such particularly
[2:33:27]
at the time where we have such vacancies
12 ft of depth for them to sell socks or
[2:33:33]
something to qualify for this zoning.
[snorts]
[2:33:36]
Um I don't think it's I think it's
prohibitive or sets up an unfair
[2:33:40]
barrier.
>> So we we did we did send this back to
[2:33:42]
planning commission. They changed it
slightly so that it only applies to
[2:33:49]
» certain there's more than just so like
what what is being described as
[2:33:53]
functionally like a new building
scenario which I think at that point it
[2:33:58]
would be a new build scenario so they
could program it in the broader concern
[2:34:04]
and I share this concern is like is not
the new build scenario it's the existing
[2:34:09]
space scenario so the reason why 20 feet
of foot of a
[2:34:13]
was selected is because that's basically
the individual storefronts today. And
[2:34:18]
what we potentially do if we do not keep
that in place is we incentivize
[2:34:24]
a number of businesses to become one
gigantic space. And once you make that
[2:34:30]
interior change to tear down a bunch of
those walls, you're not going to get
[2:34:35]
kind of like small stall spaces back.
and small stall spaces have
[2:34:42]
a potentially good need. Obviously there
this individual property has a um a
[2:34:48]
troubled history for like really a
really specific subset of reasons, but
[2:34:52]
if you look throughout the rest of
downtown, those um classically sized uh
[2:34:59]
commercial spaces serve a specific type
of need. So if in fact the building
[2:35:06]
like we don't know what's going to
happen with that space if it becomes
[2:35:09]
like if there ends up being some sort of
new build scenario because we've
[2:35:13]
troubleshot stuff and that ends up being
then we kind of at this point they can
[2:35:18]
just deal with that and they can deal
with this and give us an active street
[2:35:22]
and hopefully they're going to be
choosing those active uses. Um, but for
[2:35:26]
the time being, if we're going to have
the existing spaces as they are, I don't
[2:35:31]
want to incentivize someone to come in,
tear down the walls throughout, turn it
[2:35:35]
into one big large footprint use,
um, rather than, you know, someone ends
[2:35:42]
up with it and then it's just going to
be a large footprint use for the rest of
[2:35:46]
» something. Aren't you incentivizing them
to take more property because they can't
[2:35:51]
use the first 12 ft for
>> No, the point this the point of this is
[2:35:55]
that you if you come into one of those
individual spaces, you can totally you
[2:36:00]
can run your fitness studio out of any
of those individual spaces
[2:36:05]
» uh any
>> like give an example. So the um village
[2:36:08]
streets the former village treats.
>> Yeah. So it's not more than 20 ft. It's
[2:36:12]
not more than 20 ft. So they could come
into village treats and run a fitness
[2:36:16]
studio,
>> right? Which
[2:36:17]
» under this rule they could do that
>> so small and they could do another one
[2:36:21]
next to it. They could do that.
>> So do we know Okay, I'm getting a better
[2:36:26]
sense of this now. So do we know which
individual properties
[2:36:30]
are more than 20 like are any of
>> I think it's like the I think it's a
[2:36:34]
like a basically
>> it's [snorts] Yeah. Um I
[2:36:38]
» mean theater is probably more than 20
ft. I mean it's a post office, right? I
[2:36:43]
mean it'd be large properties.
>> Yeah.
[2:36:46]
» Of current of the current building
footprints it was American Family Market
[2:36:52]
and I think there was one other that
might qualify like where shift is now.
[2:36:58]
» Yeah. Former family.
>> Yeah. made a shift. I was looking we
[2:37:04]
were just looking at the um
>> of the of what's considered under 230
[2:37:10]
Habford, but yes. So,
>> no, that's what I'm thinking. Okay. Like
[2:37:14]
there there's broader like there are
>> there are broader problems with the
[2:37:19]
downtown commercial use mix that like
this doesn't address at all. And in
[2:37:24]
fact, I think that this kind of just
like says we're out of ideas. please
[2:37:28]
come put in the large footprint space.
And and I think that that
[2:37:32]
» No, I get it now. I I now that I've seen
the 20 foot, I understand that
[2:37:39]
I I thank you. [laughter] You address my
concern.
[2:37:42]
» Yeah. I think that that
Yeah.
[2:37:46]
» Okay. Yeah.
>> I mean, 12 ft a lot and I'm afraid we're
[2:37:50]
going to get not an unintended
consequence of a store saying, "Oh god,
[2:37:54]
you got to subtract 12 ft and sell some
stuff. only 12 ft if you're combining
[2:38:00]
for the major the but
>> right it can also be a completely
[2:38:03]
different business
>> right [laughter]
[2:38:07]
you can enter from the rear and it would
be fine
[2:38:08]
» but you have a lot of small little
studios and things place
[2:38:16]
» yeah I mean I guess 12 ft seems like if
you're going to have like sort of a
[2:38:20]
counter a front c I think of like the
yoga studio right by my office you know
[2:38:25]
you don't you don't See behind it
there's sort of a counter up front. I I
[2:38:30]
don't I mean well feet is
I guess I don't have a sense of is that
[2:38:35]
from me as Cindy is
>> two of these tables.
[2:38:39]
» Yeah.
>> Oh yeah. This a 6ft table. Yeah. These
[2:38:40]
are probably sixt.
>> I think it basically reflects what their
[2:38:44]
other recommendation for the ground
floor on Montgomery Avenue had been
[2:38:47]
which I think was for a depth of 12 ft.
I think they were keeping it consistent
[2:38:51]
in terms of like what the minimum like
amount of like activated space and
[2:38:55]
obviously you can go beyond that but
>> is anybody else uncomfortable with this
[2:38:59]
rule? I you know I don't want to spend a
huge amount of time that are
[2:39:04]
» no I support it. I I think I I'd have
concerns if it was broader but because
[2:39:08]
it's so
>> um specific to Habford Avenue and
[2:39:13]
Northworth Avenue I think it makes sense
to keep those as active as
[2:39:17]
» possible. Yeah. And we're allowing uses
that are not allowed there today. So
[2:39:21]
you're
>> getting
[2:39:25]
positive.
>> Okay. My question was more about the
[2:39:27]
noise part of this. Um
>> uh I wasn't really clear on whether this
[2:39:33]
is meant to relate to the business use.
You know, is this is this put in because
[2:39:38]
uh it's a sort of a newly allowed active
use that might generate more noise. Um,
[2:39:44]
and
just looking at the wording of it, it
[2:39:49]
seems like you would need to insulate
sound between the 12T section and the
[2:39:55]
rear section, you know, since you have
since they are different uses since the
[2:39:58]
fitness uses in the back and the retail
uses in the front. This this seems to
[2:40:03]
say additionally you need to provide
some buffering between those two uses
[2:40:08]
even if it's the same operator or the
same.
[2:40:11]
» So it's at the law boundary. So it would
have to be on it's measured at the
[2:40:15]
boundary.
>> Yeah. And I thought it was along
[2:40:16]
boundaries with the res.
>> I don't think I don't think it applies.
[2:40:20]
» It says adjacent uses.
>> Mhm.
[2:40:22]
» So it's not to be only if the other
place says it's a nuisance. I mean the
[2:40:26]
other the other business have to
complain about it.
[2:40:28]
» It it's complaint based.
>> Nuisances are complaint driven, right? I
[2:40:32]
mean in general the public nuisance law,
somebody has to complain about it. I
[2:40:35]
think a business would not be happy as a
gym studio like [snorts]
[2:40:40]
and it feels like then you would really
have the problem of retrofitting a space
[2:40:44]
for that. Right.
>> I think our
[2:40:46]
» preemptively address that
>> I think it's mostly the people that
[2:40:51]
would be sharing space with and they're
going to have some kind of deal with
[2:40:54]
whatever they share.
>> I think that would be like it would be
[2:40:57]
» but I mean you're not allowed to be a
nuisance to your neighbors. So like if
[2:41:00]
they were
>> well but this is in there so that heaven
[2:41:04]
can take action rather than it being
like a simple
[2:41:06]
» just I'm just curious about the wording
because since adjacent uses and since
[2:41:09]
we've defined fitness as a new use we're
demanding that the first 12 ft be
[2:41:16]
separate from that they become adjacent.
>> Yeah. So if if their business partners
[2:41:20]
complained about them, I mean, but they
would, you know, yes, I I understand,
[2:41:25]
but like they they would have to be
sympatico with the other use in front.
[2:41:29]
» But if I hear you saying the front use
is retail, the back use is Jim. So
[2:41:34]
soundproof by if the front use
complains, then they send it, but the
[2:41:38]
front use would have to complain. Like
we're not going to proactively enforce
[2:41:41]
the
front use complaint.
[2:41:45]
» Would you like to exempt the front use
from instance? No, I just that the you
[2:41:50]
know I was I was thinking about the
where the noise part of this came from
[2:41:55]
and the rationale behind it and we had
had not had a chance to talk about this
[2:41:59]
before so I thought no it's a good
question to bring up the first thing I
[2:42:03]
thought of when I thought of this was um
what was the uh crossfit like I remember
[2:42:07]
this being a big thing when I was
working at council office like people
[2:42:10]
would come because the crossfit people
were throwing the bars and stuff and
[2:42:13]
like it became a noise like nuisance
issue So, that's kind of what I had
[2:42:19]
thought of when I was looking at like
why this would be included in general
[2:42:22]
performance standards. Um,
>> yeah, I mean, I assumed it was like if
[2:42:27]
you're doing something with music that's
thump thump, you know, a rhythmic thing,
[2:42:32]
you certainly are. That [snorts] is
actually a great example because the
[2:42:36]
reality is walking down the street you
don't hear the thump and the music which
[2:42:41]
is probably why then they're saying yes
the thump th something has to be now
[2:42:45]
you've just convinced me of the 12 ft
[laughter]
[2:42:49]
» right right
>> because you don't want to be walking
[2:42:51]
down the street hearing the crossfit the
music the whatever so it should be
[2:42:57]
» you know it doesn't matter if the
cashier doesn't find it the people
[2:43:00]
walking down the street
>> right I
[2:43:02]
» I think I think it is objective
standards for Kevin is the reason why
[2:43:05]
it's in there for for officer to
determine whether something is
[2:43:11]
in fact a problem.
>> Yeah, you did just
[2:43:15]
» and are these noise standards are they
ported over from
[2:43:19]
» there's another provision and it's about
industrial uses. It's the same noise
[2:43:22]
standards for industrial uses.
>> And so this is just applying them
[2:43:26]
» to the uses. Okay.
So the that table is already in our
[2:43:33]
» in our code.
>> Okay.
[2:43:37]
» Yeah. So sounds like we're good.
>> All right. But then the only other piece
[2:43:40]
which we didn't we discussed before, but
I just wanted to call that out just so
[2:43:43]
everyone's aware was the um the
restaurant small restaurant um gets
[2:43:48]
matched up with the rest of retail for
the the parking. So that just
[2:43:53]
Okay.
>> All right. So everyone's okay with this?
[2:43:56]
» Yep.
>> All right. Sounds like we're good.
[2:44:02]
» Okay. So, we'll have this then uh so
hearing no changes.
[2:44:07]
» Uh [snorts] we will see this then before
us for authorization to advertise at the
[2:44:11]
September business meeting.
>> Correct.
[2:44:13]
» Okay.
[clears throat]
[2:44:17]
» Budget.
>> All right. Um, so the budget discussion
[2:44:23]
that I wanted to have with you tonight
is uh more just to let you know about
[2:44:28]
the process and timelines and how we're
going to proceed with this. Um, I do not
[2:44:32]
have a budget for you yet to look at.
Um, I will soon. Um,
[2:44:36]
» understand there's been some turnover in
the office.
[2:44:39]
» Yeah, I've been spending my week um
entering in PICO bills into QuickBooks
[2:44:42]
um instead of working on the budget. So
um so what we're looking at moving
[2:44:47]
forward is um that we
began in August. So once the CIP was
[2:44:55]
adopted, I did start pivoting to the to
the budget. Um internally obviously
[2:44:59]
we've had some uh kind of staff turnover
has has limited some of that. Um, but I
[2:45:04]
have started having some uh preliminary
staff meetings to review some budget
[2:45:09]
requests and I have sent out a request
for departmental budgets to all of our
[2:45:15]
internal departments and community
partners um and all of our boards and
[2:45:20]
commissions uh to get their budget
requests in by um by September. So, in a
[2:45:28]
couple weeks I'll have all of those and
then we'll be able to look at those in
[2:45:31]
earnest. Um, in October I plan to uh set
up our small group meetings with council
[2:45:40]
and mayor. Um, so by that point we'll
have all of our budget requests. So
[2:45:44]
we'll have our preliminary budget laid
out, ready to go. Um, we'll get
[2:45:48]
additional feedback uh from council.
Those small group meetings, uh, they
[2:45:53]
will not meet quorum requirements. Um,
so we'll we'll break them up. We'll meet
[2:45:58]
with you guys. This is your opportunity
to ask questions, take deep dives,
[2:46:03]
anything you want to know. Um,
understand that's going to be the the
[2:46:07]
primary kind of meet for council to
really dive into some of those
[2:46:11]
specifics. Um, happy to talk about those
at public meetings, but this will help
[2:46:16]
to kind of keep the process moving
moving along. Um,
[2:46:21]
the budget obviously once we have it uh
open to the public, we can start taking
[2:46:25]
some uh public feedback as well.
And then the budget will just be
[2:46:30]
continued uh to be refined throughout
October. And then the intent is that I
[2:46:36]
will have a final budget to present to
you at the council work session.
[2:46:42]
And then we will move to advertise the
final budget um with the intent to
[2:46:48]
actually adopt the final budget earlier
than normal this year. So we want to
[2:46:52]
adopt our final budget by November
business meeting this year. So, that is
[2:46:57]
the goal. That is the timeline. So,
we're going to be diving right in. Um, I
[2:47:01]
think we did a lot of really good work
on the budget last year. Um, I think
[2:47:05]
we're going to have um a a good go of it
again this year. We're maintaining a lot
[2:47:11]
of status quo things. So, really the
main thing that I want to just call out
[2:47:16]
is as we get into the budget season now,
as we discussed in the CIP, we had those
[2:47:21]
projects that we identified in the CIP.
this is now where we actually put our
[2:47:25]
money
in where our mouth is. Um,
[2:47:31]
so that's something that I want you all
to um kind of review again the CIP, take
[2:47:37]
a look at what you actually want to
spend on those capital projects for next
[2:47:42]
year. And that's going to be a really
kind of key decision-m point that I will
[2:47:47]
need council's feedback on. Otherwise, a
lot of it is just administrative um
[2:47:52]
keeping the lights on uh budget. So,
that's kind of preset by what rates are,
[2:47:57]
how much energy costs, increases to
health insurance. So, we're going to see
[2:48:01]
costs increase. Um we're seeing impacts
from tariffs, from rising insurance
[2:48:07]
costs.
So, we kind of see some of those
[2:48:10]
incremental rises. Those are expected
and normal. Um maybe not the tariffs,
[2:48:15]
but the other costs are expected and
normal. And um so you'll you'll see
[2:48:20]
you'll see those budget numbers. Uh but
really where we're going to see a lot of
[2:48:24]
flexibility and where we want to put
those budget numbers is going to be in
[2:48:27]
our capital plan. Um also just to kind
of give a preview, we've talked about
[2:48:31]
this already, but just to remind you, we
did hear from Lower Merid earlier this
[2:48:36]
year. They got a reassessment from the
Philadelphia uh water department. Their
[2:48:41]
rates increased, so our rates are going
to increase. So, we will have to do an
[2:48:45]
increase in our sewer rate again this
year uh to accommodate the um increased
[2:48:50]
cost that we're that we're getting from
Laura Marion who's getting them from
[2:48:53]
Philadelphia. So, um it's it's trickling
down the line, pun intended.
[2:48:58]
» Yeah. [laughter]
>> Um
[2:49:02]
otherwise, um we are entering into our
final year of 2027 is going to be our
[2:49:08]
final year for our trash contract. Um,
so we do have a preset 4-year contract
[2:49:12]
that expires at the end of 2027 with
Muscog. So our budget for our solid
[2:49:17]
waste fund is going to be what you
expect based on what our contract
[2:49:22]
numbers are. Um, but we have started uh
those discussions and analysis
[2:49:28]
to see what uh Laura Mary might be able
to do for us as a trash hauler. And then
[2:49:33]
uh we'll be looking at putting a bid
together again next year uh for a trash
[2:49:38]
hauler if if we're not able to work
something out with Laura Marion or we
[2:49:42]
decide to have some um additional
comparisons. So in terms of kind of some
[2:49:45]
long-term thinking um of staff work
products, we're planning on applying for
[2:49:51]
grants next year for the um playground.
We're planning on doing a um RFP for a
[2:49:59]
new trash contract. Um, so we got a
couple big things coming on and those
[2:50:03]
are going to be uh, you know, spring and
early summer timelines for some of those
[2:50:08]
big efforts next year. So that doesn't
impact the budget necessarily uh, for a
[2:50:12]
trash contract for for 2027, but just to
give you a preview of things to come.
[2:50:18]
Um, those are kind of the main things.
So our sewer solid waste um, and our
[2:50:24]
general fund and our capital fund are
going to be kind of the big ones. Um,
[2:50:27]
our highway aid, those that's our liquid
fuels funding. we get money from the
[2:50:31]
state for that. Um, so we will be
looking ahead at the program that we
[2:50:34]
want to do for next year for our road
paving. We will actually likely need to
[2:50:39]
seed some money into that fund from our
general fund. Um, since the the money
[2:50:45]
from the state only covers about half of
the scope of work uh of what we
[2:50:49]
typically plan to do. So, if we're going
to be doing a half mile of road, which
[2:50:52]
is what our game plan is, uh, we'll
probably need to take a look at putting
[2:50:56]
some extra money into our highway aid
fund. Again, all of this will be in the
[2:50:59]
budget documents that come to you, but
just kind of little previews of things
[2:51:04]
to come.
>> This is what I think about as I'm
[2:51:08]
brushing my teeth every day. [laughter]
>> How are we going to put the HA fund
[2:51:12]
together?
>> Questions about the uh budget process.
[2:51:18]
All right. So, it sounds like we'll have
small group meetings coming up next.
[2:51:21]
» Yes. Um, so we'll have, like I said,
we're going to do um, uh, get our
[2:51:26]
preliminary budget requests in. Um, so I
hope to have a kind of loosely
[2:51:30]
structured preliminary budget. Some of
the funds that we know ahead of time
[2:51:35]
that we can anticipate those costs. Um,
I should actually have more or less
[2:51:39]
final numbers for you by September.
Those are already well underway. Um, the
[2:51:42]
general fund and the capital fund are
going to be the real malleable ones. So
[2:51:46]
we'll have a loose kind of structure for
that in September. And then we'll have
[2:51:50]
our um small group meetings after the
September meeting kind of leading into
[2:51:54]
the October workshop.
>> Um and then we'll continue to refine.
[2:51:58]
» All right.
>> Okay. Thanks, Maggie.
[2:52:00]
» Thank you.
>> Uh we do have one consideration item
[2:52:05]
tonight, which is the revised bid award
for the storm water bumpouts.
[2:52:10]
» Move to approve the revised bid award
for the storm water bump.
[2:52:14]
» Second. Okay.
And just briefly to explain why this has
[2:52:19]
to happen. So after we um amended the
bid scope at last month's meeting, it
[2:52:26]
turns out that when we took that scope
of work out of the bid awards, a
[2:52:29]
different contractor became the lower
bidder.
[2:52:32]
» Um so we just
>> so we just for uh crossing our tees um
[2:52:39]
have to rebid this to now the lowest
responsible bidder. Reward it.
[2:52:44]
» Reward it.
>> I'm sorry. Yeah.
[2:52:46]
» Not rebid. Reward. Um and so the the
contractor is actually going to be
[2:52:51]
Calone who has done our um bumpouts in
the past and is very familiar with the
[2:52:55]
process. So they're a known entity as
well, which is um a a plus.
[2:53:01]
» Since we're taking action, should we see
if anyone wants to
[2:53:03]
» Yeah. I'll let any council members who
want to speak? Anybody have something to
[2:53:07]
say here?
>> They also do our sidewalks, right?
[2:53:09]
» Yeah, they've done a lot of work.
>> Yeah, they've done a lot.
[2:53:13]
Okay. So, this is an action item. So, if
any if anybody in the audience wants to
[2:53:17]
um make a comment about this stormwater
bumpout revised bid.
[2:53:22]
Anybody online wish to make a comment?
Okay. We will have public comment
[2:53:27]
shortly, but general public comment. Uh
okay. So, let's vote on the revised bid
[2:53:34]
award for the storm water bumpouts. All
those in favor of awarding the bid to
[2:53:37]
Caloney. Okay.
All right. Thanks everyone. And uh
[2:53:44]
committee reports
FNAF FNA has not met since the last
[2:53:50]
report. I anticipate we're going to um
what are we going to talk? Are we going
[2:53:55]
to we going to get to the budget by that
point or
[2:53:58]
» uh we yeah again the the smaller funds
um I think we should have some of those
[2:54:03]
yeah preliminary budget numbers ready to
start taking a look at.
[2:54:06]
» Okay. Okay. And we're also uh just
reminding you our new um boards and
[2:54:11]
commissions reporting structure calls
for FNA to make contact with all the
[2:54:17]
boards and commissions that don't
regularly report to a committee. So
[2:54:21]
» uh I got one from uh zoning hearing
board this morning. I'm going to follow
[2:54:25]
up with whatever it is the other four or
five that do that.
[2:54:30]
give my compliments to Naida for taking
care of their deferred uh business.
[2:54:36]
[snorts] Guess I'm not really one of our
boards committ
[2:54:44]
since you last met.
>> Public health and safety meets next
[2:54:49]
week. So we have not met since
>> last council meeting.
[2:54:53]
» Okay.
>> All right. We will move on then to
[2:54:56]
public comment. So, apologies for
putting it at [snorts] the end of a long
[2:55:00]
meeting, but it is what it is. So,
public comments limited to 3 minutes.
[2:55:04]
Please give your name and your address
and then you can begin your public
[2:55:07]
comment.
[2:55:10]
Barbara
Barbara Forner, 415 Conway. Um, hi
[2:55:16]
everybody.
I'm having deja vu. Um,
[2:55:21]
I just wanted to make a couple comments
on the 2011 sale property. I mean,
[2:55:25]
that's near and dear to my heart. It was
uh I was really thrilled to be one of
[2:55:30]
the council members to have to vote to
accept the school district saying, "We
[2:55:34]
don't want responsibility or don't want
any claim to this building. You guys can
[2:55:37]
have not knowing."
[2:55:42]
[laughter]
So, yeah, and I spent a good bit of my
[2:55:46]
time on council the second time dealing
to myself.
[2:55:50]
Um, I think it really is imperative to
proceed with the RFP process. Now, it
[2:55:56]
kicking this can down the road any
further not going to get any better.
[2:55:59]
It's just going to get worse. And I
think it's vital to use a consultant for
[2:56:04]
this work. To think that a municipality
of our size would be so fortunate as to
[2:56:11]
find a burough manager who could manage
a process like this, write the RFP, do
[2:56:15]
all the scoring, that's that's a
unicorn. And you know, no shade on
[2:56:21]
Maggie, she's great, but good Evans, you
know, so we need to be sensible about
[2:56:25]
that and say, "Yeah, we need help for
this." Um,
[2:56:29]
I'm concerned
that you that the process that was laid
[2:56:34]
out in December
has not been followed in the sense that
[2:56:38]
you allowed a presentation to be made
outside that process. I don't feel like
[2:56:44]
that's fair or transparent to the people
who submitted letters of intent in
[2:56:48]
December or somebody that might respond
to the RFP down the road. So, I would
[2:56:52]
just, you know, if you want to continue
to allow that, I think you need to let
[2:56:57]
those other people come and make
presentations outside the RFP process,
[2:57:00]
too. So, I just wanted to know that. Um,
and I just don't think it makes sense to
[2:57:08]
go with anything that kind of maintains
the status quo. We really need to get
[2:57:13]
out of the business of being a landlord.
Every iteration of council since
[2:57:18]
December of 2017, every bureau manager
has said the same thing. We cannot
[2:57:23]
continue to be a landlord. And
if you can find a developer
[2:57:28]
[clears throat]
who wants to apply for all these grants,
[2:57:32]
who wants to do the programming, I love
some of the ideas that could be in in
[2:57:38]
this space, you know, like the artist
studios or maker spaces or whatever, but
[2:57:43]
you need somebody who's running those
programs. It's not going to be somebody
[2:57:47]
who's the burrow employee. We don't have
the bandwidth for that. So I think you
[2:57:52]
really, you know, we really need to
think about what can we take on and what
[2:57:56]
can we do and I think we really have to
say we can't do that. We need a
[2:58:01]
developer or you know somebody who's
willing to take that on. [clears throat]
[2:58:05]
The last thing I want to say is I want
to say none of this is a commentary on
[2:58:08]
Refugeio. I love this company and I want
them to be in Arbor forever. They remade
[2:58:13]
my front yard and I
[cough and clears throat] have my
[2:58:15]
backyard.
Anybody who wants to see how they can
[2:58:20]
have more storm water retained on their
property, have um sequester more carbon
[2:58:26]
on their property and have wildlife
habitats come by 415 Conway, take a look
[2:58:31]
at my yard, knock on my door, ask me
questions. I I it's like the best. So,
[2:58:39]
» thank you. And uh just as to process, I
will note that our current rules of
[2:58:43]
council allow two council members
[clears throat] to put an item on the
[2:58:46]
agenda. So that's that was the process
that was following you.
[2:58:49]
» Just want you to know it doesn't seem
fair to me to other folks.
[2:58:54]
» Okay.
>> Okay. Um uh I'm blessing at 243 North
[2:59:00]
Lynwood Avenue. Um so I'm just here a
war graduate narrative resident, a
[2:59:07]
member of the MCO 30% project which
advocates for housing for all across the
[2:59:12]
county. And I'm just um here to
hopefully speak to um the housing
[2:59:18]
portion being a center portion, you
know, not excluding any other ideas, but
[2:59:23]
just being a a central portion of um for
uh the property at 2011 say buying. And
[2:59:30]
so just giving a different perspective,
speaking um from the perspective of
[2:59:35]
someone who has experienced homelessness
and as someone who's grown up in this
[2:59:39]
community, left to go to college, came
back, Nworth is a bit cheaper than New
[2:59:44]
York City. and I would love to stay and
continue contributing to this place that
[2:59:50]
I love, but like many fellow Gen Z
people, this desire is becoming
[2:59:55]
increasingly out of reach despite having
IV degree and working full-time. Um, and
[3:00:01]
so, um, I used to volunteer at the food
bank, spend a lot of time on that
[3:00:07]
property, which has a lot of potential
as we've heard and seen today. And I
[3:00:12]
think that Narborth has an incredible
opportunity to turn this space into a
[3:00:16]
thriving space um while providing safe,
stable housing for members of our
[3:00:22]
community, whether it's newly graduated
students starting um out in career,
[3:00:27]
young families seeking a safe
environment, seniors wanting to stay in
[3:00:30]
Narbor, and can be a model um that can
be done in the midst of this countrywide
[3:00:37]
affordability crisis um while
maintaining the diversity of of our norm
[3:00:42]
community where community uses uh other
community uses can be complimentary to
[3:00:47]
that. So um that's why
>> nice thank you
[3:00:54]
they're close to being neighbors it
sounds like. So [laughter and snorts]
[3:00:58]
I'll talk to you after the game. Uh okay
that's it for folks in this room I'm
[3:01:02]
assuming or Jeff did you want to make a
public comment. Okay let's move to folks
[3:01:05]
online. So if you'd like to make a
public comment, please uh raise your
[3:01:10]
hand and then we will call on you.
Anybody remaining?
[3:01:18]
Anybody online wish to make a public
comment?
[3:01:24]
Okay, seeing none, uh I'm going to close
public comment at this time. And we do
[3:01:31]
not have an executive session scheduled
after this meeting. So I'll take a
[3:01:35]
motion to adjourn.
>> No, we do.
[3:01:37]
» We do.
>> Yeah.
[3:01:38]
» Sorry. We do have a second session
during which we will discuss [laughter]
[3:01:42]
» personnel matters.
>> Personel matters. I apologize.
[3:01:45]
» We do have an executive session. Motion
to adjourn. Okay. We will not be coming
[3:01:48]
into session after meeting. There's a
motion to a second.
[3:01:51]
» Any discussion? All right. Voting to
adjurnn. All those in favor of
[3:01:54]
adjournment. Thanks everybody.
My apologies. I did not remember
[3:01:59]
[laughter] the meeting.