[5:44]
>> Good morning.
[5:45]
Welcome to the regular meeting of the Development Review
[5:48]
Committee.
[5:49]
Today is Tuesday August 25th, 2026.
[5:53]
My name is Tabitha Bostic with Development services,
[5:56]
and I will be serving as the chair.
[5:58]
Today we have one project submitted for plea application
[6:01]
and two projects that are being recommended to the Department
[6:04]
heads for approval. -- pre-application.
[6:11]
Before we begin I will read the preamble
[6:15]
and then we will have the committee members introduce
[6:17]
themselves.
[6:18]
The Development Review Committee is
[6:19]
a technical advisory committee, not
[6:21]
a decision making body, which makes recommendations
[6:24]
to department heads who provide final approval.
[6:26]
Pre-application meetings are intended
[6:28]
to provide preliminary comments for proposed development
[6:30]
Projects.
[6:34]
Comprehensive reviews will be provided
[6:39]
upon submittal of the preliminary Binding site
[6:42]
plan, site engineering plan, final development
[6:45]
plan, or plat application.
[6:49]
Now the members will introduce themselves.
[6:55]
[Roll call] This meeting is being recorded
[6:58]
and will be available following the meeting.
[7:00]
With that, we will begin with tab A.
[7:03]
This applicant here for Tab A?
[7:07]
Please come to the podium, introduce yourself
[7:10]
and tell us about your project.
[7:11]
>> Good morning.
[7:13]
I'm Matt Phillips, southeast engineering group.
[7:17]
I'm here to talk about onshore orthodontics.
[7:20]
It's a proposed orthodontic facility located on US 17,
[7:24]
on the west side of US 17 between pages dairy
[7:27]
and 200 just north of the railroad.
[7:29]
They are proposing a 500 zero square foot space
[7:32]
for their operations and then another 500 zero square foot
[7:36]
for future tenants.
[7:38]
So it's a ten zero zero zero square foot building in total.
[7:43]
Stormwater drainage will be towards the railroad.
[7:45]
We've met with the dot, and they've
[7:48]
asked us to close the median cut in 17.
[7:51]
So we'll have a right in right out driveway.
[7:54]
We plan on doing a directional drill beneath 17 to connect
[7:58]
to the GA e force main on the far side,
[8:01]
and we're proposing an on water --
[8:06]
on site water treatment plant for domestic water.
[8:10]
>> We will go around and make comments.
[8:13]
>> Good morning.
[8:15]
You're showing the accessible parking and accessible route
[8:18]
already, so we have no further comments at this time.
[8:22]
>> Will Ryder, Planning department.
[8:26]
Have a few notes here.
[8:29]
Your zoning is commercial intensive and your future land
[8:32]
use designation is commercial.
[8:33]
That's good for what you're wanting to do.
[8:39]
It's also situated in the Timber Decides design overlay.
[8:43]
All of the architectural standards and design
[8:47]
standards of timber of tides would apply to this project.
[8:52]
So I'll preface this by saying timber the tides.
[8:55]
Have you heard anything about it?
[8:58]
>> I have heard of it, I haven't done a project all the way
[9:01]
through design and permitting timber to.
[9:06]
>> I think of it as a new urbanist type of design where
[9:10]
there is a lot of emphasis on esthetic architectural standards
[9:13]
creating a sense of community, having green spaces
[9:19]
and gathering areas and those sorts of things with the more
[9:25]
intense developments being around those nodes,
[9:28]
like you would have at US 17 and SR 200.
[9:36]
If you think of old downtown districts with buildings
[9:41]
pulled up to the front, that's what was envisioned
[9:45]
and was adopted by the County Commission.
[9:47]
It roughly extends from a little bit West 95, down to the bridge
[9:53]
and interrupted by EMCPA Wildlife in a couple places.
[10:02]
With that in mind, here's a couple of highlights that
[10:06]
would apply to this project.
[10:07]
You've got the entitlements that this property has not
[10:10]
been rezoned to T5, but it's in the T5 transect.
[10:13]
So you have the entitlement of the commercial intensive zoning
[10:18]
district with those permitted uses.
[10:24]
But you've got the design architectural standard timber
[10:27]
the tides.
[10:28]
Articles 44 and 45 of the Land Development Code would apply.
[10:33]
This is recorded, so you don't necessarily
[10:36]
have to write all of these down.
[10:37]
I'll highlight them and you can go and listen to the video
[10:40]
as well.
[10:42]
44.06.01 has a chart, and it's got your site design
[10:50]
and transect standards.
[10:51]
It talks about building frontage, setbacks,
[10:55]
building heights and those sorts of things.
[11:01]
One of the highlights from that chart
[11:03]
is there's a 90 build out requirement on the front.
[11:06]
So your front setback is zero, minimum of zero
[11:11]
and a maximum of ten feet on the front.
[11:15]
90% of the building-- it would have
[11:22]
to be turned from the design that you have,
[11:25]
and extended with 90% of it being between 0 and 10
[11:32]
from the front property line.
[11:36]
There are some exceptions to that
[11:39]
if you went to Municode online, buried in an ordinance,
[11:43]
you're not going to see it because it was just
[11:45]
recently adopted.
[11:46]
There were a couple of exceptions
[11:48]
to that frontage build out.
[11:50]
Calculation of minimum frontage build out, so
[11:56]
excludes access, drives, pedestrian walkways,
[12:02]
required setbacks and any required buffer or screen.
[12:05]
So that would give you a break there.
[12:07]
Than 90% frontage buildout is a big one,
[12:09]
and then your side setbacks are zero, minimum setbacks
[12:13]
and rear setback of ten feet.
[12:15]
The big one is the front there.
[12:17]
The other thing Is, LDC land Development Code 44.06.02 has
[12:25]
a civic or social space requirement.
[12:31]
Those are things like there are some choices there
[12:34]
that you have with the T5.
[12:36]
There's a passive park, a playground.
[12:39]
There is a plaza square.
[12:42]
But the plaza and the square have minimum size requirements
[12:45]
of a half acre.
[12:47]
So there is a requirement for this social green area that's
[12:54]
required in this district.
[12:58]
If you're interested in pursuing this, and I hope you are,
[13:06]
let's have subsequent conversations about that
[13:10]
and see if there is some way to maybe employ
[13:15]
those to the frontage requirements somehow or another.
[13:19]
I don't know if that's going to be an option or not.
[13:22]
We went in discussion with that.
[13:24]
This is a lot of new code for a lot of us.
[13:28]
Sorting through all of it, and there
[13:30]
may be some ways that perhaps would be helpful on that.
[13:33]
The main entrance of the building
[13:36]
with that new urban design in mind,
[13:39]
the main entrance of the building is got to face us 17.
[13:42]
If you've got to have that much frontage,
[13:44]
it would be running that way anyways, I would imagine.
[13:49]
Table 44-5, you have a required frontage.
[13:54]
That's the area between the front of the building
[13:57]
and the public right of way.
[13:58]
It's not a big area, but there's different types
[14:00]
of frontages in there that you can look at and pick one.
[14:06]
The edge conditions and the need for a multi-use trail
[14:12]
requirement for a multi-use trail is a requirement as well.
[14:16]
I think multi-use trail where a sidewalk would typically go.
[14:20]
But I think Tim will probably talk more about that.
[14:23]
The landscaping is requirements in 45.04.05,
[14:29]
and the lighting and sound requirements are 45.04.06.
[14:35]
Like all projects, even outside timber,
[14:43]
LDC 45.05.06 you have dumpsters, mechanical equipment,
[14:49]
service areas.
[14:50]
Those have to be screened.
[14:51]
They have to be on the side of the rear of the building.
[14:54]
Architectural standards, there's a lot of them.
[14:57]
Don't need to go through all of this.
[14:59]
There's 45.05.02 as the architectural standards.
[15:03]
That will give you the requirements
[15:05]
on material requirements.
[15:07]
You're located in an activity center called The Yulee Historic
[15:20]
Activity Center.
[15:25]
That's the name of the activity center.
[15:28]
You have to pick a different historic mercantile,
[15:34]
mid-century.
[15:35]
There's several architectural styles in there,
[15:38]
and the building would have to mirror one of those,
[15:40]
and you would get some flexibility with the building
[15:43]
materials and that is all laid out in 45.05.02.
[15:50]
And the parking is required to be to the rear.
[15:53]
That would be what you need to do anyways if you
[15:56]
shift this building location.
[15:57]
And the other one that is a big one, and maybe I
[16:00]
saved the worst for last, it's in the activity center.
[16:10]
The building's got to be two stories.
[16:14]
I was looking for anything in the code
[16:17]
where the second story did not have to be functional.
[16:19]
I haven't found anything like that.
[16:22]
So you've got to have two stories.
[16:26]
But I think if you're interested in this,
[16:29]
I think it might be helpful to have a meeting with planning
[16:31]
staff and development services with Tim and Caleb.
[16:37]
It sounds like a lot, and it is.
[16:40]
I'm not going to sugarcoat that.
[16:44]
It's doable.
[16:45]
It just depends on if you're interested in pursuing it.
[16:53]
We're happy to help you.
[16:56]
>> You had me until two stories.
[16:57]
I was okay with everything else.
[17:00]
>> That's a tough one.
[17:04]
I probably should have said that earlier.
[17:05]
We don't want to help you through this process.
[17:08]
Working within the regulations, and that may sound strange.
[17:14]
>> Is there a process where we can request relief from the two
[17:17]
story requirement?
[17:18]
>> There are some relief provisions,
[17:21]
since you used that word.
[17:23]
I like that word in Timber to Tides.
[17:30]
The one that comes to mind is the planning director,
[17:33]
Elizabeth Beck, my boss.
[17:38]
She has some leeway on A bit of the frontage builder
[17:47]
requirement.
[17:48]
Don't hold me on that, but there are some provisions in there.
[17:53]
Not for the second story requirement I don't think.
[17:59]
But there is some leeway for the frontage requirement
[18:03]
and I think there's a few other points in there too.
[18:06]
Not sure if they would be helpful or not.
[18:08]
I think maybe trying to get creative with some
[18:12]
of the green space requirements and that sort of thing
[18:17]
might be helpful.
[18:24]
I'll try to sort through this.
[18:30]
90% is a long orthodontics office.
[18:38]
If you didn't have that buildout requirement,
[18:41]
you could accomplish some of that with the second floor.
[18:44]
Which -- with the second floor and the furniture.
[18:51]
That's a tough one.
[18:52]
You'll obviously have the things that you can get relief on.
[18:55]
You obviously have an access drive that won't count.
[18:58]
There are some required setbacks.
[19:01]
Required buffering and screening of those edge conditions.
[19:05]
Maybe that could be helpful.
[19:08]
Maybe looking at it with this green space requirement
[19:14]
actually could be helpful, because you're trying to reduce
[19:19]
the length of that to be able to go that way without getting
[19:23]
absurd on square footage for what you're trying to do.
[19:26]
I'd be happy to meet with you at any point.
[19:31]
>> Do the architectural standards apply to the frontage?
[19:35]
>> What's people from the right of way,
[19:38]
the materials have to be consistent all the way around.
[19:42]
>> Thank you.
[19:45]
>> Tim Davidson with development services.
[19:50]
Will mentioned a little bit about the edge zone in timber.
[19:54]
That section 17 is called Urban Edge zone.
[19:57]
You can find all of this in the planning section of the website,
[20:02]
the whole timber document.
[20:05]
Figure 45.05 identifies that urban edge zone.
[20:11]
And it's illustrated in figure 45-19.
[20:14]
There's an eight foot minimum public seating zone, ten foot
[20:20]
trail, which will mention in an eight foot street buffer
[20:25]
that you'd have to incorporate.
[20:28]
The rest of my comments don't have anything
[20:30]
to do with timber to tides.
[20:32]
17 is a dot road, so any improvements in 17
[20:40]
will have to be permitted through FDOT.
[20:44]
And you're showing that you have a connection out to the trail.
[20:47]
That sidewalk needs to be a six foot minimum.
[20:50]
>> I don't believe it is now.
[20:53]
And we don't have right of way there
[20:54]
to make it wider without getting into the utility zone, which
[20:59]
I don't know if the Dot is going to want
[21:01]
us to extend that sidewalk right up to the back of their curb.
[21:03]
What do we do in that situation?
[21:07]
>> I'm not sure I understand.
[21:09]
>> Do I need to widen the sidewalk along the front >> I
[21:14]
don't know that we have ten foot between the right of way
[21:17]
and the back of curb.
[21:18]
We don't have enough right of way to accommodate that,
[21:20]
do we need to give you an easement?
[21:24]
>> Yes.
[21:24]
Sometimes the trail does meander on the property, so
[21:28]
an access easement.
[21:32]
>> Per BSCC resolution 2019, 174.
[21:39]
All development requires a traffic impact analysis.
[21:42]
First step is to call our traffic engineer Andrew
[21:45]
to discuss the requirements.
[21:46]
We'll look at the trip generation and so forth
[21:48]
and surrounding intersections.
[21:50]
This is to determine what will be needed
[21:52]
if anything to be analyzed.
[21:54]
I want to call attention to the article
[21:55]
ten of the roadway and standards,
[21:57]
it's our stormwater management requirements.
[22:00]
It largely aligns with Saint John's.
[22:01]
I will note a few things that sometimes people miss.
[22:05]
The pond has to contain 100 year storm type of bank.
[22:11]
We do require stormwater maintenance plan.
[22:14]
Once you get approval for the site,
[22:16]
we have construction inspection fees.
[22:18]
Those are listed online.
[22:19]
We have an engineering checklist in the development services
[22:22]
section of the website that will help you along with the--
[22:27]
I would like to note that section 61 states
[22:30]
DRC approval shall be obtained prior
[22:32]
to commencement of all projects to breaking ground.
[22:34]
>> One of the things that the owner wanted to do was maximize
[22:38]
parking on the site, which I know your LDC has a 10%
[22:42]
limitation over the code minimum parking as a maximum.
[22:46]
Is that right?
[22:50]
>> I think that's more planning.
[22:53]
>> The question is if they perceive this project and half
[22:56]
the building is a space that's vacant,
[22:57]
can we assume a worst case intensity to maximize
[23:00]
the parking for that situation?
[23:02]
How do we make sure we don't exceed a maximum number,
[23:06]
but yet at the same time maximize the amount of parking
[23:09]
we put on the site?
[23:11]
>> Let me go back to the parking requirements on that and get
[23:15]
back with you on that.
[23:28]
>> That's all I had.
[23:31]
Thank you.
[23:33]
>> Environmental health.
[23:35]
I know you said you are going to connect to JEA.
[23:39]
We need a letter of availability from them
[23:42]
because currently there are no utilities there.
[23:44]
>> We can provide it.
[23:45]
I think we already have that.
[23:47]
There's no water out there.
[23:48]
They're telling us there's a force
[23:52]
main on the east side of us 17, and we can share that with you,
[23:56]
>> We just need a letter that they can provide it to you.
[24:01]
That's fine.
[24:02]
That's it.
[24:04]
>> No problem.
[24:05]
>> Good morning.
[24:07]
Fire Marshal office.
[24:13]
As there is no hydrant within 500ft of this building,
[24:19]
what is the proposed location, you would have to have a pond
[24:23]
with a 50 year drought study that has a drought hydrant.
[24:28]
If you go that route from the placement of the dry hydrant,
[24:31]
it has to be 100ft distance before you actually have
[24:33]
a structure.
[24:34]
I don't know if that's going to work in this configuration.
[24:44]
Alterations where the building is facing everything and that
[24:48]
may -- outside of that.
[24:53]
You have to have a tank that is capable of holding
[24:57]
the required water supply for fire flow for that building.
[25:05]
Roadway US 17 is going to be wide enough and the Parking
[25:12]
or drive through is going to be wide enough at least 20ft.
[25:16]
It's not going to be considered a dead end because you
[25:22]
don't have 150ft of driveway.
[25:27]
According to what will have said since the building
[25:30]
is going to face on the front.
[25:32]
Anything that is -- we just so the base thing is going to be
[25:41]
providing water source.
[25:43]
>> We were hoping to do a dry hydrant on a wet pond.
[25:53]
We are negotiating with CSX right now on that.
[25:57]
It may not be an option but could you repeat what you said
[26:00]
about 150ft from dry?
[26:01]
What is the requirement there?
[26:04]
>> So the fire code parts at least a minimum of 100ft
[26:16]
distance between the hydrogen and the building.
[26:19]
>> And then when we configure the parking,
[26:21]
I don't know if we'll exceed 150ft dead end,
[26:25]
but can you give me the fire apparatus specs so we can make
[26:28]
sure we turn it around?
[26:31]
>> So if you had a driveway that was 150ft from the front
[26:35]
of the property, it requires a turnaround,
[26:37]
which would be the T shape because you're not going to be
[26:40]
able to get a -- >> And if we don't want to do a tank and we
[26:44]
can't do a pond because of CSX, do we have the option to do
[26:48]
a fire well?
[26:53]
>> You do not.
[26:55]
>> Okay, thank you.
[26:58]
>> Did you have any questions?
[27:01]
>> No, you've answered all my questions.
[27:04]
Thank you for your time.
[27:06]
>> With that, we will conclude tab A and move
[27:09]
in to our Approval tab B, SP25-032.
[27:19]
Do you all have any comments?
[27:24]
>> Planning department has no comment.
[27:27]
>> Building department has no comment.
[27:31]
>> Environmental health has no comments.
[27:35]
>> Fire Marshal has no comments.
[27:41]
>> Tab C, SP25-055 Charis Eating Disorder Expansion Approval.
[28:01]
Any comments?
[28:08]
>> No further comments.
[28:12]
>> And with that, we will conclude today's meeting.