Agenda
[1:06]
Public Comments
[11:40]
Overdose Awareness Day Proclamation
[13:37]
Eversource Grant of Location - 77 Wellesley Avenue
[27:23]
Stephen Palmer Jurisdiction Update
[33:39]
MWRA Project Updates
[1:19:43]
193 Garden Street
[1:57:21]
Public Mural
[2:03:34]
Town Communications Update
[2:37:06]
Traffic Regulation Amendments
[2:47:48]
Dedham Ave Intersection Improvements
[3:07:04]
Walpole Intermunicipal Agreement
[3:16:45]
Digital Legal Notices Warrant Article
[3:26:11]
Large House Amendment Referral
[3:27:39]
Open STM Warrant
[3:40:20]
Commissioners of Trust Vacancy
[3:41:54]
Town Manager Report
[3:44:38]
Committee Reports
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:33]
Okay.
[0:33]
Hello everyone. Welcome to the select board meeting
[0:35]
for August 11th.
[0:37]
We are gonna start our meeting with
[0:41]
this notice about this meeting being broadcast
[0:43]
by the Needham Channel for the Town's YouTube channel,
[0:47]
and recorded for later viewing.
[0:52]
I think the Needham Observer
[0:54]
and the Needham Local are with us recording.
[0:56]
Is anybody else in the room recording?
[0:59]
Time to tell the chairs now?
[1:01]
Okay, then apologies for the late start,
[1:04]
just working out some technical difficulties.
[1:06]
And now we will move to our first agenda item
[1:08]
with which is public comment.
[1:10]
And I will ask Avery Newton to join us here at the table
[1:13]
for our first public comment.
[1:19]
Just introduce yourself, remind us of your address,
[1:24]
and we're gonna ask you to wrap up in about three minutes.
[1:27]
You can do great. And apologies for the noise outside.
[1:30]
I had thought this was seven.
[1:31]
I set up childcare accordingly. So
[1:33]
No, the noise is The noise Is the light?
[1:35]
Good, good. Good evening and good to see you.
[1:38]
Members of the select board.
[1:40]
My name is Avery Newton and I live at 69 Howlin Street.
[1:43]
For those of you in this room who may not be aware,
[1:47]
basala Art in the heart of Needham Center
[1:48]
and staffed by my next door neighbors will soon be home,
[1:50]
become home to the Town's 18th Bank branch.
[1:54]
I know I'm not alone and feeling frustrated
[1:56]
and a little defeated by this news, but
[1:57]
before I go further, I want to be clear.
[1:59]
My concern is not with Village Bank specifically.
[2:02]
My concern is with the systems
[2:03]
and structures that allowed us to get
[2:04]
to number 18 in the first place, not
[2:06]
who number 18 happens to be.
[2:08]
Restaurants, cafes, small businesses, markets,
[2:11]
and third spaces are destinations.
[2:12]
They bring people downtown, encourage them to stay longer
[2:15]
and support neighboring businesses.
[2:17]
Banks provide an important service,
[2:19]
but they are not destinations, they're institutions.
[2:21]
They generate far less foot traffic
[2:23]
and far fewer opportunities for people
[2:25]
to shop, dine, or linger.
[2:27]
In other words, it's not just a destination we're losing,
[2:29]
but also a meaningful portion of the customer base
[2:31]
that neighboring businesses rely on.
[2:34]
The supporting research is remarkably
[2:35]
consistent and available here.
[2:37]
If anyone's interested, independent local businesses
[2:40]
recirculate substantially more
[2:41]
of their revenue within the local economy than national
[2:44]
chains and large institutions up to two to four x.
[2:46]
As we approach the critically important Pollard vote,
[2:49]
this is the type of revenue that we all depend on
[2:51]
to sustain our schools, our parks, our tax base,
[2:53]
and ultimately the community itself.
[2:56]
Finally, and perhaps most significantly,
[2:58]
there is a profound irony here.
[3:00]
Landlords generally view corporate banks
[3:01]
as safe low risk tenants,
[3:03]
but in chasing that short term safety,
[3:05]
they actually risk hollowing out the very foot traffic
[3:07]
and business diversity that makes Needham commercial real
[3:09]
estate so valuable in the first place.
[3:12]
With all that said, I want to look to the future
[3:14]
and encourage the select board
[3:15]
and other town leaders to consider some solutions.
[3:17]
Knowing that no one can control who a landlord decides
[3:19]
to rent to first zoning
[3:22]
and land use, I'd ask the select board
[3:24]
and planning board to explore ground floor use restrictions
[3:26]
or conditional use permits for banks
[3:28]
and other large financial
[3:29]
institutions in our commercial core.
[3:31]
Cambridge did exactly this in Central Square back in 2017
[3:34]
after realizing that bank Oversaturation specifically was
[3:38]
negatively impacting both the retail diversity
[3:40]
and the overall economic health of the of the area.
[3:43]
Second, financial incentives for commercial properties.
[3:46]
I'd encourage the town to explore vacancy fees
[3:48]
for storefronts sitting empty, unleaded paired
[3:50]
with a split rate to commercial tax exemption for landlords
[3:54]
who lease to local merchants.
[3:56]
I understand that a small business popup program may already
[3:58]
be in the works for this space,
[3:59]
and I'm eager to see if that
[4:00]
arrangement could be scaled as well.
[4:03]
Third and finally, policies supportive
[4:05]
of small local businesses to help lower the cost
[4:08]
of doing business in Needham.
[4:09]
This could include establishing a BuyRight approval process
[4:12]
for independent shops or cafes under a certain size
[4:15]
or raving first year permitting fees
[4:16]
for local entrepreneurs.
[4:18]
My overall point is this.
[4:20]
We don't need 18 different places to store our money.
[4:22]
We need more places that make this
[4:24]
wonderful town a community.
[4:25]
I humbly ask that town leadership consider exploring one
[4:28]
or several of these policies to help promote some
[4:30]
of the vitality that we have continued
[4:31]
to lose under these current practices. Thank you.
[4:34]
Thanks, Avery. Spike, the
[4:38]
Appreciate it and hopefully within within three minutes.
[4:41]
Perfect. Thank you for your time. Perfect.
[4:44]
All right, so we're gonna invite Cory Wilke, come on up.
[4:49]
See? Thank you. Hi, Corey. Nice to see you.
[4:52]
Nice to see you. Thank you. Members of the board,
[4:54]
my name's Corey Wilke.
[4:56]
I live at six Wayne Road in Needham.
[4:59]
I have two children in the school system,
[5:01]
and I am speaking as a member of the Needham
[5:04]
and Baseball softball, Needham Baseball
[5:06]
and Softball Board as both the director of RSB, which is one
[5:09]
of our baseball programs
[5:11]
and is the Vice President of baseball operations.
[5:13]
Having assumed that position when Chris Gerstel resigned
[5:17]
from the board a year ago.
[5:19]
I submitted a letter today to you guys on top of a couple
[5:22]
of emails, but I'd like
[5:24]
to just touch briefly within three minutes
[5:26]
or less upon the urgent need that we have,
[5:28]
which is the renovation repair memorial field
[5:31]
with a turf in field grass Outfield
[5:34]
Needham currently has only three big diamond baseball fields
[5:37]
down from four several years ago when McLeod Field was
[5:40]
converted to softball, a decision never presented
[5:43]
to the NBA sport for input, despite Chris Gerst.
[5:46]
Then simultaneously being the Parks and Rec commissioner
[5:49]
and the VP of baseball ops
[5:51]
and being involved in that project from inception
[5:53]
to completion, most members
[5:55]
of the board did not find out about it until it was done.
[5:59]
We face a similar problem at a greater scale
[6:01]
because Warner Field, one
[6:02]
of the three remaining big diamonds, is slated to serve
[6:04]
as a staging area for the Pollard Middle School Project,
[6:07]
which we support, and we could go offline within 12
[6:10]
to 24 months, leaving only two big diamonds, one
[6:13]
of which Walker Gordon doesn't meet dimensional requirements
[6:16]
for varsity baseball
[6:17]
and immemorial is typically unusable
[6:20]
as it cannot handle adverse weather.
[6:22]
As an example, varsity was only able to practice on
[6:24]
that field approximately 25% of the days
[6:27]
this PA, this past year.
[6:29]
So we desperately need assistance from the town.
[6:31]
With respect to field maintenance costs,
[6:34]
MBS spends significant amounts of money on
[6:36]
outside contractors to maintain our fields.
[6:38]
This was an arrangement initiated seven years ago by Mr.
[6:41]
Geral. We surveyed 15 period communities only Weston's Youth
[6:46]
Baseball Board contributed in any meaningful way,
[6:48]
and then at a significantly lower scale than us.
[6:51]
We have paid on average $70,000 a year towards fields over
[6:54]
the past five years plus user fees.
[6:57]
We've only been able to find one town
[6:58]
that contributed more than 5,000 on average.
[7:01]
We also pay a higher user fee than most
[7:04]
or almost all other towns,
[7:06]
and we receive significantly fewer services in terms
[7:08]
of town raking lining, game prep, or wet field prep.
[7:12]
Currently, our middle school team does not have a diamond.
[7:15]
Our freshman are often canceled
[7:17]
because varsity needs to go to Warner
[7:19]
and JV then to Walker Gordon.
[7:21]
Without Warner, we'll have four teams competing for two
[7:24]
and without a memorial rehab, often one diamond
[7:27]
that's not taken into account, the 10
[7:28]
or so little league big Diamond teams.
[7:31]
The two Legion teams are the four Rocket selects teams
[7:33]
that all play on the big diamonds.
[7:36]
This is an urgent need
[7:37]
and we really hope that the town can complete the Memorial
[7:40]
Field Project in 2027.
[7:43]
We're also hoping
[7:44]
to find a short term third diamond while Warner is offline,
[7:49]
maybe through town connections of Babson or St.
[7:52]
Sebs, ensure
[7:53]
that Warner will actually be brought back online as soon
[7:56]
as possible when staging is done,
[7:57]
and identify a location
[7:59]
for a fourth diamond in the long term,
[8:01]
because three hasn't been sustainable for us.
[8:04]
The letter today includes more detail then I can express in
[8:06]
these three minutes, which I think just ended.
[8:08]
So I'm happy to do anything further.
[8:10]
That would help. Thank you. Thanks.
[8:11]
Thanks, Corey. And the
[8:12]
we'll be reaching out to you to get Okay. Thank you
[8:14]
Very much. To put
[8:15]
Some discussion Together.
[8:16]
Thank you. Okay.
[8:20]
All right. And the last public comment that we're aware
[8:25]
of tonight is Bill Looney.
[8:28]
Come on up. Thanks for being here tonight.
[8:33]
Thank you. Your name and your address, please.
[8:36]
Good evening. My name is Bill Looney.
[8:38]
I live at two 13 Garden Street in Needham.
[8:40]
I'm joined by mini neighbors here tonight,
[8:45]
and we ask that the select board not endorse a 1 93 Garden
[8:48]
Street Project as it is proposed.
[8:51]
We attended the April 28th select board meeting
[8:53]
with the same request and with the ferry.
[8:56]
Same concerns. We've had communication with Mr.
[8:59]
Aldi since the last select board meeting,
[9:02]
but there have been no changes to the proposed project,
[9:05]
and there have been no other actions taken
[9:06]
to address the neighborhood concerns
[9:08]
since this process began.
[9:11]
It's been frustrating to say the least.
[9:14]
I believe the neighborhood is supportive of a sensibly sized
[9:17]
friendly 40 B project at the development at the site,
[9:21]
but the developer proposes to build ten five bedroom homes
[9:26]
on a single family lot in a single family neighborhood.
[9:30]
Simply put, the size
[9:32]
and scale of this proposed project is grossly oversized
[9:36]
for the lot and outta scale for the neighborhood.
[9:40]
This unreasonable scale raises numerous environmental
[9:43]
zoning, safety and neighborhood deficiencies.
[9:48]
Late last week, a number of neighbors submitted letters
[9:50]
to the town manager
[9:51]
and to the select board outlining our serious
[9:53]
concerns about the project.
[9:56]
These concerns include the following, numerous building
[9:59]
and zoning issues focused on density, building height,
[10:03]
parking, adequacy, and circulation,
[10:05]
and lack of disability access, safety issues,
[10:08]
including first responder access
[10:10]
and fire safety, accessibility,
[10:13]
serious environmental concerns.
[10:15]
The property is adjacent to conservation areas and wetlands.
[10:19]
The project will require substantial grading,
[10:21]
vegetation removal, expanded impervious areas,
[10:24]
intensive habitat disturbance into the wetlands area
[10:27]
and its buffer zones.
[10:29]
And in order to expand the lot's buildable area,
[10:32]
the developer proposes
[10:33]
to construct a massive retaining wall adjacent
[10:36]
to the wetlands to fill in the gully
[10:38]
that drops down into the wetland area.
[10:41]
And fourth, there's a lack of detail and review.
[10:45]
We ask that the select board be cautious in considering a
[10:48]
project with so many concerns
[10:50]
and very little information to address those concerns.
[10:55]
We know Mr. Aldi builds nice homes,
[10:57]
and we ask that the development at 1 93 Garden Street be
[11:01]
appropriate for the neighborhood, the neighborhood.
[11:03]
Ask that the select board please not endorse the project
[11:06]
as it is proposed.
[11:07]
There are so many serious deficiencies
[11:09]
that it's not possible to come up with a list of conditions
[11:12]
that could remedy this proposal.
[11:15]
We believe the developer should go back to the drawing board
[11:17]
and submit a pro and submit a project that's suitable
[11:21]
for the lot for the neighborhood
[11:22]
and for the town. Thank you.
[11:24]
Thank you. Okay.
[11:28]
Is there anyone else in the room who came with the intent
[11:31]
of making public comment?
[11:34]
All right. Anyone online? I don't see any hands. No. Okay.
[11:39]
Thanks everyone. All right.
[11:41]
So the first item on our agenda is the 2026
[11:45]
International Overdose Awareness Day proclamation.
[11:49]
And for that, we'll turn to the vice chair,
[11:52]
Certainly.
[11:54]
Whereas International Overdose Awareness Day aims
[11:57]
to bring communities together
[11:58]
to remember without stigma those who have died from overdose
[12:01]
and acknowledge the grief of the family
[12:03]
and friends left behind.
[12:04]
And whereas observance of this day is an opportunity
[12:07]
to raise awareness about the risk of overdose,
[12:09]
promote discussion about prevention,
[12:11]
and share information about support services.
[12:14]
And whereas addiction is a disease
[12:16]
that touches families in every community,
[12:18]
the epidemic has claimed the lives of thousands
[12:20]
of Massachusetts residents
[12:22]
and affected countless other family members.
[12:24]
And whereas those affected by overdose are our children,
[12:27]
our parents, our siblings,
[12:28]
and deserve our compassion and support.
[12:31]
And whereas the town of Needham, Massachusetts does affirm
[12:34]
and acknowledge the pain
[12:35]
and hardship caused by drug overdose, now
[12:38]
therefore be it resolved that August 27th, 2026,
[12:41]
be declared International Overdose Awareness
[12:43]
Day in the town of Needham.
[12:46]
Madam Chair, I would move
[12:47]
that the board votes will approve
[12:49]
and sign the 2026 International Overdose
[12:51]
Awareness Day proclamation
[12:53]
Second.
[12:55]
All right. Any discussion? Okay.
[12:59]
All of our votes will be roll called,
[13:02]
because we have a member remote.
[13:03]
So Kathy, I'm gonna start with you. Oh,
[13:05]
Wait, I just, one thought there is overdose
[13:08]
awareness night coming up.
[13:10]
Thank You. On August 27th. Seventh 27th.
[13:13]
At Memorial Park. At Memorial Park.
[13:14]
Thank you.
[13:19]
So we have a, a motion on the table
[13:23]
and we'll go to a vote.
[13:25]
Kathy? Yes. Bill? Yes.
[13:30]
Josh? Yes. Kevin.
[13:32]
Aye. And I vote yes as well. So the motion passes.
[13:36]
Thank you. All right.
[13:39]
Next we have a public hearing, a Eversource grant
[13:42]
of location for 77 Wellesley Avenue.
[13:44]
I imagine we're gonna be joined by Joanne Calendar.
[13:48]
And is Mike Bakari in the room? I believe he's online.
[13:51]
We're online. Okay. Fantastic. Thank you.
[13:54]
Mike Bakari from Precision Contracting.
[13:59]
Hi, Joanne.
[14:04]
Okay, Joanne, just say hello.
[14:05]
I'm not sure we can hear you. Oh, no, we're not hearing you.
[14:10]
Hang on one sec. Try again.
[14:16]
Hmm. Nothing yet. Nothing yet.
[14:18]
Nothing. Hello? Everyone good?
[14:21]
I heard him. Oh, there we go. Okay. Fantastic.
[14:23]
Hi, Joanne. You
[14:25]
Can hear me now?
[14:26]
Yes, we can hear you now. Thank you. Okay.
[14:28]
Can, can you tell us about this grant of location?
[14:31]
Sure. So let's see. Try that again.
[14:34]
We actually sent an updated package yesterday
[14:37]
because there was some changes to the poll
[14:39]
that Eversource will be providing service from.
[14:42]
Okay. So, and I noticed in the packet
[14:45]
that the clerk sent out,
[14:46]
she did not include the newest plan.
[14:49]
I sent it over minutes ago.
[14:51]
I don't know if you received it,
[14:52]
but at, so at this point,
[14:55]
Eversource is seeking the grand location to install,
[14:57]
install approximately 17 feet of conduit
[15:00]
into Wellesley Avenue.
[15:01]
And that's from Pole 61 11.
[15:06]
And that is to provide underground service
[15:09]
to the new home at 77 Wellesley Avenue.
[15:13]
Okay. Thank you. All right. Thank you, Joanne.
[15:15]
Okay, so yeah,
[15:17]
it looks like quite a few changes, Madam Town Manager.
[15:22]
Is everything in order here?
[15:24]
Unfortunately, the work was completed.
[15:26]
Well, initial work was done
[15:28]
before the grant location, and that's why we have Mr.
[15:31]
Bakari here. And just to note for the board in your packet,
[15:34]
you do have the most updated that Ms.
[15:35]
Calendar just referenced. Okay.
[15:37]
So you're looking at the updated requests.
[15:39]
I Think the poll is four,
[15:41]
not a different poll in the packet.
[15:44]
Yeah, I think when the clerk sent it over yesterday,
[15:46]
she sent the engineer sketch, not the actual plan.
[15:50]
So I don't know if you have the plan in your packet
[15:53]
that shows the 17th feet of conduit coming from 61 over 11.
[15:58]
Yeah, I see a sketch, I think.
[16:00]
Yeah. So you didn't get, I I emailed it, like I said,
[16:03]
around five 30, but I wasn't convinced you would receive it.
[16:06]
Sure. I can pull it up on my screen if, if you can see
[16:09]
that I, yeah.
[16:11]
Can you, can you see it? I
[16:12]
Think I, I mean, for me,
[16:14]
the sketch is adequate personally,
[16:17]
but I, I guess I do have a question.
[16:19]
So if we've changed polls,
[16:22]
but some of the work was already done, can,
[16:24]
can you help us understand where work was done
[16:28]
and if it has to be undone or redone?
[16:31]
No. So the, the customer did install the conduit from the
[16:34]
correct pole from 61 over 11.
[16:37]
So it's, the 17 feet of conduit is already present. Okay.
[16:41]
We just had it wrong on our sketch.
[16:43]
We were coming all the way down the street from a different
[16:45]
pole, and we were looking for over a hundred feet
[16:48]
of conduit, which just was not correct.
[16:50]
Okay. So I'm glad
[16:54]
that the work was done correctly.
[16:55]
However, Mr.
[16:59]
Bakari, perhaps you can help us understand
[17:03]
how the work was done ahead of the grant
[17:04]
of location that's required.
[17:08]
So, truthfully, it was an oversight on
[17:12]
my end and the,
[17:16]
the electrician's end as well.
[17:18]
We were under the impression that we were supposed
[17:21]
to lay the conduit down, bring it to
[17:24]
the handhold before the pole.
[17:26]
The hand hole is just basically a, a box
[17:28]
before the pole, get it inspected,
[17:31]
and then get in touch with Eversource to come out,
[17:33]
do the survey, and then have this grant of, right.
[17:41]
Now, obviously we understand that that is the wrong order.
[17:46]
Have you done, have you done work in Needham before?
[17:49]
I've done plenty of work in Needham before,
[17:51]
but truthfully, this is my first underground,
[17:55]
my first underground service that I'm doing.
[17:57]
Typically, it's always overhead.
[18:00]
Okay, thank you.
[18:03]
We were about, I think we're about,
[18:06]
I think we're about five feet short, so it was kind
[18:09]
of last minute that we had to decide to
[18:13]
do an underground service as opposed to an overhead.
[18:17]
Okay. Thank you for that explanation.
[18:21]
Do any of my colleagues have any questions
[18:23]
or comments, Jill?
[18:25]
So, so if Joanne, the, that one 15 feet
[18:28]
that was originally proposed,
[18:30]
not none of that was ever done.
[18:31]
Right?
[18:33]
That was not, they only, they came from
[18:38]
the private property, if you will, of over
[18:40]
to the pole 61 over 11. Okay.
[18:42]
Thank you. The pole is right at the end
[18:45]
of our property, if that helps with you.
[18:48]
I don't know if you have the, the slot plan in
[18:51]
front of you. Yeah.
[18:52]
Okay. I'm gonna open this.
[18:55]
This is a public hearing, so I'm gonna open this up.
[18:57]
The public comment, if there's anyone in the room
[18:59]
who came here in order to discuss this matter.
[19:05]
Okay. It appears not, is there anyone
[19:06]
online who's here for this matter?
[19:08]
No, there's not. Okay. All right. So Mr.
[19:13]
Bakari, what? I thought I saw something.
[19:16]
Oh, Mr.
[19:18]
Bakari, the, we, we need to ensure that you are,
[19:25]
that the grant of location is taken care of prior
[19:27]
to the work being done in all cases.
[19:29]
You know? Yes. It ensures safety, it ensures
[19:34]
that the work is gonna be done properly.
[19:36]
It ensures that there's no property issues.
[19:41]
So I just, mistakes happen. Yeah.
[19:45]
And I, I hear your explanation
[19:47]
that this was your first underground one,
[19:48]
but I just wanna make sure that you understand
[19:50]
that in the future, this is the first stop
[19:53]
and the work has to come second.
[19:55]
Yes, definitely. And we just, just to
[19:59]
reiterate a little bit too, it was,
[20:00]
we did have the electrical inspector come out
[20:03]
and inspect it as well just to, you know, solidify
[20:06]
that all the, the work was done properly.
[20:08]
I think the biggest mistake for me was the process
[20:13]
coming to you first and then feeling involved.
[20:17]
This, we just always wanna make sure that, you know,
[20:20]
the neighbors have an opportunity
[20:21]
to weigh in if there's anything
[20:23]
that they're concerned about, et cetera.
[20:25]
It's just public access and engagement. Absolutely.
[20:27]
That's required. So, alright, so I guess
[20:31]
the work has been done
[20:35]
and in done on the correct poll,
[20:37]
so we can all be glad for that.
[20:39]
Does anyone have any comments they'd like to make?
[20:41]
It seems like we've seen this a couple times now.
[20:44]
And do we publicize well or why, what?
[20:47]
I don't understand why it keeps happening.
[20:49]
I guess I, and I guess so that's my question.
[20:52]
Then the other question is, you know, do we keep track
[20:56]
of people who do the work before they come here?
[20:59]
Because if they ever come back a second time,
[21:02]
I really would not be that favorable.
[21:05]
Yes. But I don't know what we can do.
[21:07]
That's a good question. Thanks for the question.
[21:11]
So maybe three years ago we had a whole slew
[21:15]
of work being done before a grant of location.
[21:17]
And so the board at the time had asked us
[21:19]
to make operational improvements to figure out
[21:21]
how we can better educate all of the parties.
[21:24]
I'd say part of the issue is that
[21:28]
each party is losing sight of the other piece of the puzzle.
[21:32]
So a contractor has a building permit through the town,
[21:36]
sometimes an electrical permit, they have
[21:39]
to request from Eversource, an Eversource field agent
[21:42]
to go out on the scene.
[21:43]
If they wanna do underground, the Eversource team goes out,
[21:48]
does the initial sketch.
[21:50]
And a lot of times what we're hearing from contractors was,
[21:52]
well, Eversource came out and they gave me this sketch
[21:55]
and so that's the work that I'm gonna do.
[21:57]
So we instituted a lot of process improvements,
[22:00]
understanding that that was maybe giving contractors
[22:04]
and not a clear understanding that then the, the grant
[22:06]
of location comes to the select board actually
[22:08]
through Eversource, not through the contractor themselves.
[22:12]
And that then the work should continue from there.
[22:14]
So some of the improvements that we made from that time was
[22:17]
we met with Eversource, we became fast friends
[22:19]
with Miss Calendar, and one of the things
[22:22]
that we requested is when the Eversource team goes out on
[22:26]
site, that they let us know
[22:27]
that they've been out in the field with someone so
[22:29]
that we could just give a call to the contractor
[22:31]
and say, Hey, we know that you met with Eversource,
[22:33]
but you should know that, that there's more steps to come.
[22:39]
But the other piece is making sure we educate on our
[22:42]
own materials.
[22:44]
So when you apply for a building permit, now you have
[22:46]
to indicate whether you're going overground
[22:48]
or underground overhead or underground.
[22:51]
And on our building permit page, there's language on there
[22:55]
that says, if you're going underground, here's the grant
[22:58]
of location requirement.
[22:59]
So it's built into our permitting system
[23:02]
and you know, the obligation at the end
[23:03]
of the day really is on the permit polar.
[23:06]
So I'll, I'll note that on the, the plans that we have,
[23:11]
I mean, it is highlighted in bright yellow
[23:14]
that says the electrician to wait for grant of location
[23:17]
before completing work to pull. So
[23:20]
It, and I wanna acknowledge Eversource made
[23:21]
that change at our request from a few years
[23:24]
back. They added that text
[23:25]
To the, which is, which is great.
[23:27]
But yeah, maybe, maybe, I mean,
[23:31]
it it seems pretty, is this what they're giving to the,
[23:36]
okay, so then, then I guess the folks aren't reading.
[23:40]
I mean it, you know,
[23:43]
'cause it, it, it's on both pages highlighted.
[23:46]
Right?
[23:48]
Put it in red. It did. I mean,
[23:51]
It, it's actually, I mean, it's actually yellow.
[23:54]
It's outlined in red and highlighted in yellow.
[23:57]
It's hard, it's hard to imagine how someone could,
[24:01]
could kind of miss it, honestly. Well,
[24:03]
In, in this situation, when Eversource went out there,
[24:06]
the work had already been done.
[24:08]
So we, we didn't have the sketch to hand to the customer
[24:12]
'cause the work had already been done. Oh,
[24:14]
Okay. Good. Good
[24:15]
Point.
[24:16]
Could I, could I, could I say one thing just as the Sure.
[24:19]
Help Us kind of Yeah.
[24:20]
Just to kind of get real life scenario please.
[24:25]
I, I, I do think that there is a disconnect
[24:29]
from the contractor slash electrician
[24:34]
to the permit pulling process
[24:39]
where I, you know, when we pull the permit,
[24:43]
there isn't anything that, you know, really is like,
[24:47]
not in your face, but showing you, hey,
[24:50]
you have to go through this step.
[24:53]
You know, like when we, when we go to pull a permit, we have
[24:56]
to upload a bunch of requirements, right.
[24:58]
You know, we have to upload the site plan,
[25:01]
the permit drawing, I mean the architectural drawings.
[25:04]
And there's nothing that really says, Hey, you need
[25:07]
this plan from Eversource to move forward.
[25:11]
Okay. So it was, I I will say like it, for me, doing the as
[25:15]
as this being my first time doing a underground service,
[25:19]
I was a little confused, taken back, I guess
[25:22]
with the process because it wasn't
[25:27]
really straightforward for us on our end.
[25:31]
Once I spoke with Eversource, it was very easy
[25:33]
and very straightforward, but I did not know
[25:36]
that process beforehand.
[25:38]
Okay. Well I appreciate that perspective.
[25:41]
We'll have to discuss this internally to see if there's any,
[25:46]
I hate to, I hate to belabor, but I'm madam chair,
[25:48]
but I'm wondering if we have, on the permit, we say,
[25:51]
are you going overground and underground?
[25:52]
I don't know if it says on that permit, if it says next
[25:55]
to the underground, if you're going underground, you need
[25:58]
to get the grant of location.
[26:00]
I Believe it does, but I'm gonna triple check now
[26:02]
and if not, we can definitely update it. Yeah,
[26:04]
Yeah.
[26:05]
Sorry to pull on.
[26:05]
No, no, I, I mean it's,
[26:08]
we wanna figure this out, so I appreciate it.
[26:11]
Okay. So
[26:14]
With all that said, I would move that, thank you.
[26:18]
Sign a petition from Eversource Energy
[26:20]
to install approximately 17 feet
[26:22]
of conduit in Wellesley Ave. Second.
[26:26]
Okay, great. Can I just reconfirm at the town manager
[26:28]
so we have that documentation, the correct, the,
[26:33]
the, the correct book
[26:35]
that has been done in the correct location.
[26:36]
'cause I, I'm, I'm fine with approving it now,
[26:39]
but in 10, 15, however many years from now,
[26:41]
we wanna make sure that yeah, we know
[26:43]
where the work is under our street, our sidewalks.
[26:47]
Yes. Based on the plans, the updated plans
[26:49]
of the 17 feet. Is that what you're asking?
[26:51]
And from the correct pole? Yes.
[26:52]
Okay. Yes. Engineering's fully in the loop. Yes.
[26:55]
Thank you.
[26:57]
All right. So we have the motion on the table then,
[27:00]
and I will start with Kathy.
[27:03]
Yes. Bill? Yes. Josh? Yes. Kevin? Yes.
[27:09]
And the chair votes? Yes.
[27:10]
So hearing I already, I already, we already did that.
[27:14]
Didn't forget. Thanks Bill.
[27:17]
All right, so the motion passes and we can move along.
[27:19]
Thank you both. Thank you for joining us. Have a good night.
[27:22]
You all have a great night. Thank you. Thank you.
[27:25]
Okay, the next item on our agenda is
[27:28]
Steven Palmer jurisdiction update.
[27:29]
And for that we'll turn to our town manager.
[27:32]
Thank you Madam Chair.
[27:34]
At your last meeting, we discussed a recent vote
[27:36]
of the school committee regarding their interest in
[27:39]
retaining jurisdiction over the
[27:40]
Stephen Palmer property and Building.
[27:43]
And the copy of their exact vote is in your packet.
[27:47]
But from there, based on the board's discussion
[27:49]
in at your July meeting, I drafted an initial MOA to try to
[27:55]
kind of codify some of the responsibilities that were
[27:59]
articulated or requested in the school committee vote.
[28:02]
So I won't review the where as is, which tries
[28:06]
to just put the history and the facts down clearly.
[28:09]
But the commitments in the MOA
[28:11]
for the board's consideration,
[28:12]
and I'd be looking for your feedback, is an agreement
[28:17]
that the select board would agree to assume responsibility
[28:21]
for supporting existing Stephen Palmer tenants in
[28:23]
relocating, winding down the current residential use
[28:26]
and managing the Stephen Palmer Building
[28:27]
and Parcel until the building is vacant.
[28:32]
Item two, the school committee
[28:33]
through the superintendent will prepare
[28:35]
and submit capital requests for the property for FY 28
[28:38]
through 32 capital improvement plan based on the
[28:41]
anticipated use of the building.
[28:43]
Item three, the town manager,
[28:46]
I would request funding in the fiscal year 2028 operating
[28:49]
budget that whatever is needed to maintain,
[28:52]
operate, and ensure the building.
[28:54]
And I would say a lot of that will also be driven by,
[28:57]
if the select board is making decisions under item one about
[29:02]
the wind down of the residential use
[29:04]
and how we're doing that, that would inform
[29:05]
that operating budget request.
[29:08]
And item four, if town meeting appropriates funding
[29:10]
for a town wide facilities master plan, which I've expressed
[29:13]
to the board, I would ask that be a priority
[29:18]
for the board in the coming year, that the school committee
[29:21]
and the select board would agree to include Steven Palmer in
[29:24]
that, along with all the other town owned assets so
[29:26]
that we can take a look at our assets holistically.
[29:30]
So this is for your discussion and feedback
[29:34]
and happy to make any edits the board sees fit.
[29:39]
Okay. I'm gonna open it up for discussion.
[29:42]
Does anyone, any of my colleagues want to, yeah,
[29:45]
So manager, thank you to the
[29:47]
town manager for putting this together.
[29:48]
I think this reflects the discussion
[29:49]
and I think this in my mind,
[29:51]
will help us manage the property in
[29:55]
uncertain circumstances.
[29:57]
I guess we can say it that way on, on the fourth one
[30:00]
with the, the facility master plan.
[30:02]
I, I agree with this as well.
[30:03]
I think I've heard talk
[30:06]
of potentially demolishing the building.
[30:08]
I mean, if it's gonna be in the facility master plan, we,
[30:12]
I think that would be a decision that's held off
[30:14]
until that occurs.
[30:16]
That's my understanding. At least
[30:20]
A request for funds to demolish the building would come
[30:23]
under item two from the schools as a,
[30:27]
through the capital process, I believe.
[30:29]
And I'll discuss that further with our deputy manager,
[30:33]
director of finance and the superintendent of schools.
[30:34]
But I think the timing of when the school committee wants
[30:37]
to submit that request, I think
[30:40]
that would be a conversation with them.
[30:42]
If we do move forward
[30:45]
with the town wide facilities master plan, would that
[30:47]
impact which year they'd be looking for funds to demolish?
[30:51]
But again, that, that's for, for discussion.
[30:56]
Yeah, I guess we have to discuss it more.
[30:57]
'cause if it, if it's gonna be demolished,
[30:58]
then why have it in the cap in the master plan.
[31:04]
But, but either way, if, if it was demolished, I mean
[31:07]
that would be after this, the period specified in the MOA.
[31:11]
Right? Right. So I
[31:16]
think intrinsically sort
[31:18]
of putting it off any other,
[31:24]
To me it just seems too, I,
[31:26]
it's gonna be hard to work with two and four.
[31:28]
'cause if the schools all of a sudden say we want the blank,
[31:31]
but then we're putting in a facility study master,
[31:34]
are we gonna say, okay, we're giving
[31:36]
what their blank are we gonna make suggestion
[31:37]
based on the facility study?
[31:39]
So it's just something that I think we need to look at.
[31:41]
Just like if you were to tear it down almost, you know,
[31:44]
if they had made a decision, I'm not saying
[31:49]
that it's terrible,
[31:51]
I'm just saying it's something we need to think about.
[31:53]
Agreed. Agreed. Okay. Kevin? Yeah,
[31:58]
Katie, this is fine.
[31:59]
It's great. I appreciate that, considering
[32:01]
that circumstances have changed,
[32:03]
considering this co codifies it. Well, so
[32:05]
Thank you Kathy.
[32:09]
Yeah, just, just Katie confirming here that
[32:12]
what this agreement does is that we will handle the building
[32:16]
until it is empty and then we will turn over an empty
[32:19]
building to the school committee.
[32:22]
Yes, that's correct. And then the second question is,
[32:25]
in terms of the town wine facilities master plan,
[32:29]
I'm assuming other school buildings are also
[32:31]
in that plan, right?
[32:33]
That would be my intention.
[32:34]
And it's something I've discussed
[32:36]
with the superintendent as well.
[32:38]
So we haven't scoped anything.
[32:40]
You know, this would be a budget request submission
[32:42]
through the FY 28 budget process.
[32:44]
And we could scope it, but I would recommend that all town
[32:47]
and school facilities be included.
[32:49]
Yeah. Okay. So then it's nothing
[32:51]
special about this, right?
[32:52]
If if every single facility
[32:54]
and building, whether school, town,
[32:57]
whatever is all included, then this wouldn't,
[33:00]
that would make sense, I guess.
[33:01]
But understand that that has not yet been scoped.
[33:07]
All Right. Okay.
[33:12]
All right. Yeah, I, I'm, I'm glad that
[33:15]
this MOA will help us settle this issue of governance,
[33:18]
you know, who, who's making decisions here
[33:21]
for the short term so that it will allow us to explore
[33:28]
what, what our plan should be.
[33:29]
So there's no vote on this this evening, we're just,
[33:35]
just considering and we'll take this up
[33:37]
presumably at our next meeting.
[33:39]
Thanks. Okay. Alright.
[33:42]
So we'll move on to our next agenda item.
[33:45]
This is the MWRA,
[33:48]
the Massachusetts Water Resource Authority project updates.
[33:51]
And we're gonna welcome a whole, whole team up.
[33:54]
So come on up. I'm just gonna ask you, join us here.
[33:59]
We want to make sure that when you're speaking,
[34:01]
you're speaking into a microphone.
[34:04]
Doesn't have to be like right up against it,
[34:06]
but we wanna make sure that everyone on TV can hear you.
[34:10]
And I'll ask you to start with some introductions.
[34:14]
So I think we have two items on the agenda.
[34:16]
The first one that we'll talk
[34:18]
to is a Needham dewatering drain line.
[34:20]
Great. And then we have another set
[34:21]
of people, another set of, okay.
[34:22]
Speak to the csl. Great. Alright.
[34:25]
So my name is Paul Sbar,
[34:26]
I'm the acting director for the Tunnel program.
[34:28]
We appreciate the select board meeting with us today.
[34:30]
We've met you a few times in the past on a tunnel program
[34:33]
with some updates today.
[34:34]
It's about one specific piece of construction
[34:37]
for a drain line that we need to start
[34:38]
before tunnel construction starts.
[34:40]
But it's gonna help us get the tunnel construction so
[34:43]
that when the tunnel contractor's on
[34:44]
board, he's ready to go right away.
[34:45]
So that, that's the first point.
[34:47]
And I think we add some slides.
[34:50]
Yes. But before you get started, just guys you
[34:52]
Wanna introduce yourselves And I'm David Apt.
[34:54]
I'm the design manager for the tunnel department. Great. I'm
[34:58]
Ka Combine.
[34:59]
Dean Maria, I'm the community relations coordinator.
[35:00]
Excellent, thank you. Yeah. Okay,
[35:02]
so we are starting our slides.
[35:05]
Wonderful. Getting shared.
[35:14]
Super Right. So next slide.
[35:19]
So I'm just gonna give a quick update
[35:20]
of the tunnel program just in context.
[35:22]
That leads us up to the drain drain line
[35:24]
that we're here really to talk about.
[35:26]
And then Dave's gonna walk us
[35:27]
through some specifics about the drain line
[35:29]
so you'll be aware of what the work is.
[35:30]
Great. And then we'll just cover some
[35:32]
additional questions at the very end.
[35:33]
So the next slide, we've shown this figure a number
[35:37]
of times, but within that black circle is most
[35:39]
of the metropolitan area that VM already serves water to.
[35:43]
We need to provide redundancy for
[35:45]
what you can see listed there, which is our city tunnel,
[35:47]
city tunnel extension and Dorchester tunnel.
[35:49]
That's what we call our Metropolitan water tunnel system.
[35:52]
There are a couple incidences
[35:53]
that happened in the past back in May of 2010
[35:56]
and more recently in 2024 that brought us to the, the need
[36:01]
for redundancy to the city tunnel system.
[36:03]
We had a boil water order back in 2010
[36:05]
because the, there's a water main break on the city
[36:08]
tunnel or just upstream of that.
[36:10]
That led us to the tunnel program.
[36:11]
So I'm not gonna go into a lot
[36:12]
of detail about the tunnel program,
[36:14]
but it's about providing redundancy to
[36:16]
that metropolitan tunnel system that we have.
[36:18]
Can I ask why is break in quotes? Sure.
[36:22]
Oh, we, we just, it, it was a water main break
[36:26]
so it was a significant break for us.
[36:28]
It wasn't a run of the mill type thing.
[36:30]
There's no real sub reason
[36:31]
to putting into quotes other than just
[36:34]
to draw some attention to it. Okay,
[36:36]
Thank you.
[36:40]
I think we've talked about before some of the purposes
[36:42]
for the tunnel program.
[36:44]
And the main point here is
[36:45]
that we wanna make sure we provide unin uninterrupted
[36:48]
delivery of our high quality water to all the communities
[36:50]
that we serve at any time
[36:52]
of the year without any service interruptions.
[36:54]
So that's why we need the tunnel program in order to be able
[36:57]
to do that so that those similar incidences
[36:59]
that have occurred in the past, if they happen again,
[37:01]
we have ways to direct water around them to,
[37:04]
to continue the service that we need to do.
[37:08]
Next slide. So this is really a slide showing the
[37:10]
overall tunnel program.
[37:11]
And we've shown this one to the board before.
[37:15]
We have two tunnel systems, one's in green, it's called
[37:17]
that north tunnel that's gonna go from the Mass Pike
[37:19]
and head up north five miles.
[37:21]
The one for today that we're really concerned
[37:23]
about is the south tunnel.
[37:24]
And it's shown there are two colors, blue and a red stretch.
[37:28]
And it's gonna also start at the Mass Pike in Route 1 28
[37:31]
or on I 95 interchange area.
[37:34]
That's where our halman aqueduct supplies the water into
[37:36]
these tunnel systems and it'll deliver it all
[37:38]
the way down to Mattapan.
[37:40]
But to construct that tunnel,
[37:41]
we we'll be using a tunnel boring machine
[37:44]
and the tunnel boring machine will be starting at the I 95
[37:47]
Highland Avenue interchange right here in Needham.
[37:50]
And then it's gonna go construct in two different
[37:51]
directions, one along that red path
[37:53]
and one along the blue path.
[37:56]
When that tunnel gets constructed, there's all the material
[37:59]
that comes out, comes out path,
[38:01]
those launch gas gets taken up
[38:02]
and loaded onto trucks and taken away.
[38:04]
But during construction, there'll be water groundwater
[38:06]
that infiltrates into the tunnel
[38:08]
and that water needs to also be brought back to the shaft
[38:10]
so it can be pumped up to the surface treated
[38:12]
to meet permit discharge requirements.
[38:14]
And then, so the purpose of today is
[38:16]
what we need is a pipeline to get from
[38:18]
that interchange area over to the Charles River.
[38:21]
So we call it a Needham dewatering drain line.
[38:23]
It's what we call an early enabling work.
[38:25]
So it's a piece of construction we need to do ahead
[38:28]
of the large tunnel construction contract.
[38:30]
So when the tunnel contractor comes on board,
[38:32]
there's a place for that water to go to and get discharged.
[38:35]
And so for the next slide, we're still on, just
[38:38]
so we're aware that tunnel construction is still on schedule
[38:40]
to start in 2028.
[38:42]
And this is a piece of work that we need to do
[38:44]
essentially next year so that we're ready for
[38:46]
that 2028 timeframe.
[38:48]
And now I'm gonna pass it off to Dave
[38:49]
and he's gonna talk more specifically about
[38:51]
what the need drain line will do.
[38:53]
Yes. So the Needham dewatering drainage line consists
[38:57]
of approximately 1,250 linear feet
[39:01]
of 36 inch diameter pipeline.
[39:04]
It starts at our Highland Avenue
[39:06]
I 95 Northeast Cloverleaf shaft site
[39:09]
and crosses underneath the I 95 Highway ramps
[39:13]
and then falls along Brook Road, Arlington Road,
[39:16]
makes a turn on Charles Street
[39:17]
and then turns into the 1 63
[39:20]
Highland Avenue private property to
[39:23]
where our outfall location will be
[39:24]
at the bank of the Charles River.
[39:26]
When you say falls along, do you mean under Underground?
[39:29]
Underground, thank you. Yes.
[39:32]
The purpose is to discharge treated construction water
[39:36]
during South Tunnel construction.
[39:38]
It will also be the point where we discharge the water used
[39:41]
for disinfection flushing
[39:43]
and commissioning at the completion
[39:44]
of South Tunnel Construction.
[39:46]
And it's the low point for the South tunnel system.
[39:48]
So in the future, if we need to take the tunnel offline
[39:51]
for maintenance, inspection
[39:52]
or repair, we would un water the tunnel at this location.
[39:56]
So on the next few slides, I'm gonna walk you
[39:59]
through the alignment, go over the construction methods
[40:02]
and our work hours.
[40:04]
Let's have question before go. Yeah.
[40:06]
You say 1 63 Highland is a private Yes.
[40:09]
So have you already had discussion,
[40:10]
I'm guessing with them or?
[40:11]
Yes, we're finalizing our permanent
[40:14]
easement through their parking lot. Okay,
[40:15]
Thank you.
[40:17]
We, so we start at the Highland Avenue Northeast
[40:20]
Cloverleaf, where we'll do about 150 feet
[40:24]
of trenchless construction underneath the I 95 ramp.
[40:27]
This is to not impact the traffic on the ramp.
[40:31]
We're anticipating constructing this through pipe jacking.
[40:34]
It's a figure on the bottom left hand of the slide.
[40:37]
We are anticipating this work will be done during the day.
[40:42]
Moving on to the next slide please.
[40:45]
This is our alignment within the Needham right of way.
[40:49]
So there's about 850 linear feet of cut
[40:52]
and cover construction in Brook Road,
[40:55]
Arlington and Charles Street.
[40:57]
We will construct the work
[40:58]
and stages to reduce our footprint in our impact on the
[41:02]
surrounding area with discussions between DPW
[41:06]
engineering and the police.
[41:08]
And given it's a dense commercial area,
[41:11]
we think night work would be the least impactful to buts.
[41:15]
And there are Needham sewer mains running parallel
[41:19]
to our proposed drainage line in Brook
[41:21]
Road and Charles Street.
[41:23]
So we will rehabilitate or replace those.
[41:28]
Next slide please.
[41:30]
So just, can I just ask Yes,
[41:31]
this is gonna be in place throughout
[41:33]
the entirety of the project.
[41:34]
So this is all gonna be fixed to standard, like
[41:39]
the regular Needham standard after the tunnel's in place?
[41:43]
Yes, yes.
[41:44]
And timeline,
[41:46]
how long will the trenching take Brooke Road to?
[41:49]
So our target is
[41:52]
to start construction in the spring of 2027.
[41:55]
Okay. And reaching substantial completion by spring of 2028
[41:59]
that recognizes Needham Street moratorium in the winter.
[42:03]
Okay. Okay. So we're targeting one construction
[42:06]
season. Okay,
[42:07]
Nice.
[42:08]
We got a slide coming up on that. Yeah, sorry.
[42:10]
Next slide please. And when we turn onto
[42:15]
the private property, 1 63 Highland Avenue,
[42:18]
we have about 250 feet of cut
[42:20]
and cover construction, installing our drain line leading up
[42:23]
to our outfall that will be on the bank of Charles River.
[42:26]
We'll have a temporary coffer dam for construction
[42:30]
and then the excavation will be
[42:32]
conducted from the riverbank.
[42:33]
The work on the private property will be
[42:35]
during daytime hours.
[42:37]
Next slide please. At the 1 63 Highland
[42:42]
Avenue alignment, we cross
[42:44]
below a Needham 12 inch sewer main.
[42:48]
We will remove
[42:49]
and replace the portion
[42:51]
of the sewer Maine from the manhole at 1 63 Highland Avenue
[42:55]
to the next manhole downstream at 60 Charles Street.
[42:59]
It's about 300 linear feet of sewer.
[43:03]
This work will take place within the town sewer easement
[43:06]
and the work hours will be during the day.
[43:09]
Next slide please. Upon completion
[43:13]
of our work in the right of way,
[43:15]
we will pave throughout the limits
[43:17]
of disturbance, curb to curb.
[43:18]
You can see it on the figure in the green shading.
[43:22]
Next slide please. So, coordination
[43:26]
with Needham, we've met with Needham, DPW
[43:30]
and engineering to review our 60
[43:33]
and 90% contract packages.
[43:36]
And then in April we met with DPW Engineering police
[43:40]
and fire to go over our construction zone safety plans
[43:44]
and our proposed hours.
[43:46]
And then for outreach, we held a public information session
[43:50]
for Abutters to the alignment.
[43:52]
Our designer distributed notices door to door.
[43:55]
And then we had a session on July 16th.
[43:58]
And then we are presenting at the Conservation Commission
[44:02]
hearing for our notice of intent on Thursday.
[44:05]
Next slide please. So here's our schedule.
[44:10]
We are targeting going to bid this fall with the goal
[44:13]
of onboarding a contractor in late fall, early winter,
[44:17]
and starting construction in the 2027 construction season
[44:21]
with the target of having the drain line ready for use
[44:25]
for a South tunnel contractor when they come on board in the
[44:28]
spring or summer of 2028.
[44:31]
And with that next slide please,
[44:32]
I'll hand it over to Carmine.
[44:34]
Alright, so this is a contact page.
[44:37]
We have a robust web webpage for the Tunnel,
[44:40]
pro Tunnel program.
[44:42]
Once you get on that tunnel tunnel program, you'll see
[44:46]
that it has a table of contacts,
[44:48]
introduction about the program, community updates,
[44:52]
frequently asked questions, resources, contact us.
[44:54]
This will navigate in there, answer many questions.
[44:57]
As you can see the community update,
[44:59]
that's where we find the Needham.
[45:00]
I'll notice there's any work that's in particular to need.
[45:03]
And then other communities have the same set up.
[45:06]
It's pretty user friendly.
[45:08]
Then we have ways to contact us
[45:10]
through the tunnel info@mwa.com.
[45:12]
Or you can contact myself at com, maria@mwa.com
[45:16]
and tell us how wonderful job we're doing.
[45:19]
Wow. Excellent.
[45:22]
That's it. All right.
[45:25]
What questions or thoughts
[45:29]
or discussion points do we have? Kevin, you wanna start?
[45:32]
Sure. Okay.
[45:37]
You talked about this is the lowest site in the, in the,
[45:41]
so you would de-water from the Needham site.
[45:44]
And this would be used not just for construction,
[45:47]
but if you ever had to, if
[45:48]
We ever had to maintain the tunnel in the future.
[45:50]
Okay. Yeah. It gives us a way to,
[45:51]
to release some water if we need to.
[45:53]
Thanks. So, you know the tunnel, like our existing tunnels,
[45:56]
they've been in service since the 1950s
[45:57]
and we haven't been able to take them outta line.
[45:59]
Sometimes you wanna be able to take the water out
[46:01]
so you can go inside and inspect them to make sure
[46:03]
that they're not, there's no cracks
[46:05]
or something that you need to fix.
[46:06]
Okay. So it's for that purpose.
[46:08]
So it's very, very rarely that we'd have to do it,
[46:10]
but we're constructing the pipeline for construction.
[46:13]
The idea would be to leave it in place so
[46:15]
that when in the future, if we needed
[46:16]
to, we could use it for that purpose.
[46:17]
If we ever had to release some water
[46:18]
to do some future inspection.
[46:20]
Okay. It would be all be permitted, you know,
[46:22]
every time we used it we'd have to get for the right kind
[46:24]
of permits and we notify the town every,
[46:26]
all sorts of notices like that. Alright.
[46:29]
Can you explain a coffer dam to me?
[46:31]
Sure. Yeah. It, so to construct in the river, you know,
[46:33]
the water's flowing by,
[46:35]
so coffer dam basically creates a little bit of a dam Okay.
[46:38]
So that they can construct inside there.
[46:40]
So it'd be constructing within the dry. Okay.
[46:42]
So they can get that out outlet outfall pipe
[46:45]
and then they can backfill that properly
[46:46]
and restore the, the slope so
[46:48]
that all can be done in the dry.
[46:49]
Okay. And they'll pull the, the copper dam out
[46:52]
and then the water will be restored.
[46:53]
Okay. And then best guess, during construction,
[46:56]
how much water do you imagine is going through this pipe?
[47:00]
And we, and the Charles River is basically a plume going
[47:03]
across the river of like thousands of cubic feet of
[47:07]
Whatever.
[47:08]
Yeah, no, I think, you know, we have the, the
[47:09]
for during construction.
[47:10]
Yeah. The flow rate that's coming construction.
[47:12]
Dave, you, you've got the number, I think it's
[47:14]
5 million gallons a day. Yeah.
[47:16]
So we need to permit this through DEP
[47:19]
and EPA through their Nip DS permits.
[47:22]
I've heard of that. So what we did
[47:24]
for the Metro West Water supply tunnel was
[47:26]
5 million gallons per day.
[47:28]
Okay. That's what we'll target perverting for our tunnel.
[47:32]
That would be unmitigated.
[47:34]
So the target would be
[47:36]
to mitigate the water and flow into the tunnel.
[47:38]
So you're discharging less than that rate.
[47:41]
By mitigation mean, how much is that grouting
[47:43]
and probing grouting inside the tunnel. Okay. How
[47:45]
Much is that?
[47:46]
I mean, what's that look like? 5 million gallons?
[47:52]
It's a good Amount. What amount
[47:53]
would you even compare that to?
[47:54]
I don't know. I'm a tank At
[47:56]
The aquarium inside the tunnel.
[47:57]
You know the of 5 million gallons inside the tunnel? Yeah.
[48:00]
You, you'd be able to walk through it.
[48:01]
It'd be down at the surface.
[48:03]
The contractor will pick that up into a pipe.
[48:04]
The pipe's probably on the order of six
[48:07]
to 12 inch diameter, something like that. Okay.
[48:10]
Alright. And then this pipe is a
[48:12]
storm drain, essentially.
[48:13]
So it's flowing by gravity. So the pipe itself here is 36
[48:16]
inch, but it's could be flowing by gravity,
[48:17]
like it's open channel flow. Okay.
[48:19]
And then finally, I'm sorry, the section of sewer
[48:24]
to be replaced along Charles Street.
[48:27]
Thank you. But why
[48:31]
So Oh, go Ahead.
[48:32]
Along the Charles River Bank, so that's vitrified Clay pipe.
[48:36]
Okay. So that was constructed well over 50 years ago
[48:41]
and it's a very brittle pipe.
[48:44]
So just by crossing underneath it,
[48:46]
we are going to impact that
[48:48]
Pipe.
[48:49]
Okay, sure. On that note, can I just follow up?
[48:52]
You said, I think you said 300 feet.
[48:54]
300 feet. That sounds like a, a lot at once.
[48:58]
How's that gonna impact the sewer service for the area?
[49:02]
So we would work, well we've been working with DPW,
[49:05]
we would have to bypass the sewer from manhole to manhole,
[49:08]
but that 300 feet is dictated
[49:10]
by the nearest manhole upstream, which is at 1 63 Highland.
[49:14]
And the next one downstream, which is at 60 Charles Street.
[49:17]
Okay. So if we tried to do a connection closer than
[49:21]
that 300 feet, we might not be able to get a good connection
[49:24]
to that brittle clay pipe.
[49:25]
Sure. I guess I'm just wondering
[49:26]
what the interruption will be for those commercial
[49:29]
and residential customers downstream from the,
[49:31]
There, there won't be any interruption during the bypass.
[49:33]
They'll pump out of the upstream manhole discharge
[49:35]
in the downstream manhole.
[49:36]
Okay. So they won't notice any,
[49:38]
won't notice any interruption flow. Yep.
[49:40]
Excellent. Did you have more?
[49:44]
I thought that's enough. Alright, interrupt.
[49:45]
Okay. Okay, Josh,
[49:48]
Just one question.
[49:49]
It sounded like, so this water pipe is gonna be very close
[49:52]
to the, the Needham sewer pipe.
[49:54]
And is that the reason the 300 feet that,
[49:58]
that the Needham sewer pipe will have to be replaced?
[50:02]
So, well we're, we're crossing the, the need
[50:04]
that 300 feet we're crossing.
[50:06]
So that's the, the brittle pipe
[50:08]
that Dave's talking about. That's
[50:10]
Along the bank.
[50:11]
That's along the bank. Yeah. And then
[50:11]
one, the other ones are close.
[50:12]
Within the trench, you have to create a trench
[50:14]
to create the 36 inch pipe.
[50:16]
There's other sewers that are close by.
[50:18]
So we're expecting that we might have
[50:20]
to impact those when we're installing trench
[50:22]
box to, to get through that. So
[50:23]
If the town ever has to maintain our own sewer pipe,
[50:26]
Would it impact this MWRA pipe?
[50:30]
No. No. That's why we're providing the space
[50:32]
and then restoring it so that the,
[50:33]
the pipes will have sufficient separation distances
[50:36]
so that they can be maintained.
[50:37]
Thank you.
[50:38]
Great, bill? I'm good. Thanks.
[50:39]
Very interesting and detailed. Thank you.
[50:42]
All right. Kathy, anything? No questions.
[50:48]
Okay. I just have one question. It's about noise.
[50:54]
I can see that you've thought through
[50:56]
the daytime versus nighttime work,
[51:01]
but this is, this is a reasonably small area both
[51:05]
with commercial customers and,
[51:06]
and residential neighborhoods just outside the perimeter.
[51:10]
So I guess I'm just wondering,
[51:14]
I'm not really clear on the scale of the disruption
[51:18]
that these machines will cause.
[51:20]
I just, I guess I just wanna check in on how
[51:24]
Yeah. So
[51:24]
If, if it's gonna be a destruction for those folks.
[51:27]
It, I don't, no, it won't be.
[51:29]
It's typical pipeline construction in the streets.
[51:31]
So you'll see it many times. You know, they'll have a,
[51:33]
a trench that they have to excavate.
[51:35]
Sure. The pipe is 36 inch diameter, so that's three feet.
[51:38]
But it will be to what, 10 to 15 feet? 10 to 15 feet deep.
[51:42]
And when they bury the pipe and then they backfill the pipe
[51:44]
and they, they move it along.
[51:45]
So they'll be excavating a section
[51:47]
and moving their way along the 1200 feet.
[51:49]
Okay. Most of the areas, industrial, commercial kind
[51:52]
of area, the specific streets we're going through,
[51:55]
there's no residential homes
[51:57]
or anything in that along that route.
[51:59]
And that's when we talked to this, the town
[52:01]
and the, the police and the feeling of doing
[52:04]
that work at night, probably better
[52:05]
because then the industry, the commercials are open
[52:08]
during the day, so it won't impact them during the daytime.
[52:10]
We'll be there at nighttime when they're not working. Okay.
[52:13]
Alright. Great. Well appreciated.
[52:18]
Sounds like you've answered all
[52:20]
of our questions, which is great.
[52:22]
I'm sure you will get more from the public.
[52:27]
So, so with that maybe we'll swap teams or add teams.
[52:31]
Yeah. All right. Thank you. Thank you. Thank you.
[52:44]
All right. Welcome.
[52:48]
Thank You. Just two. Okay. Just two. All right.
[52:51]
So we'll start with introductions.
[52:53]
I'm Steve Este, I'm interim executive director
[52:56]
at the MWRA.
[52:58]
Colleen Zi, director of Environmental
[52:59]
and Regulatory Affairs for MWA. Thank
[53:01]
You for, for being here.
[53:02]
We're here this evening. There's been a lot
[53:04]
of publicity about our combined sewer overflow plan update.
[53:07]
Yes. You've probably heard from
[53:10]
various folks over the many months we thought it's, we're,
[53:13]
we're offering an opportunity to chat
[53:16]
with communities about the plan,
[53:18]
provide some clear information from our perspective about
[53:22]
what the plan does and doesn't do.
[53:24]
We are in the middle of a comment period.
[53:27]
Colleen, I'll talk a little
[53:28]
bit more about that in the middle.
[53:30]
And we're looking for folks to, you know, provide sort
[53:33]
of fact-based comment from your perspective to the,
[53:37]
to the DEP and EPA so
[53:39]
that they make a good decision coming out.
[53:41]
It's a very expensive plan. Community share is pretty large.
[53:46]
And the delta between the plan that's on the table
[53:49]
and what some are recommending is very substantial
[53:54]
and substantial increment for the, each of the towns
[53:58]
that are paying both sur bills.
[54:00]
So we wanted to be careful to make sure that folks are aware
[54:05]
of this while there's an opportunity to comment so
[54:09]
that we don't have a situation the
[54:11]
after DEP has locked us down
[54:15]
and then folks realize the expense and the disruption.
[54:19]
And there are, that's, that's sort
[54:21]
of the wrong way to do public policy.
[54:23]
Excellent. Best to have him pretty early.
[54:24]
Yeah, we appreciate that. And so before you begin,
[54:28]
'cause I know you have slides, can you just remind us of
[54:31]
how long the comment period lasts
[54:33]
and then what's the decision making timeline?
[54:35]
Absolutely. Because I,
[54:37]
I think people will be wondering about that at the outset
[54:39]
and I want them to be able to pay attention
[54:40]
Here. No, that's process.
[54:41]
I don't first to our notes. Okay, great.
[54:44]
So actually we are in the middle of the common period.
[54:46]
So we submitted in April 30th
[54:48]
and comments were due September 30th.
[54:51]
We actually just got an extension from DEP in response
[54:53]
to some requests from the watershed associations.
[54:56]
So October 30th, October is the deadline for comments.
[55:01]
And we are, and I'll share the website for the program.
[55:05]
There are multiple ways to comment.
[55:08]
We can accept, we have a portal that's online.
[55:11]
We have email, regular snail mail to the MWA address
[55:16]
as well as two public hearings
[55:18]
that will be held in September where people could come
[55:21]
and get verbal public comment as well.
[55:23]
Okay, great. And then, so the deadline
[55:28]
for comments is, is October 30th,
[55:30]
but then there's some period when, so
[55:32]
We will That's right. Decision
[55:33]
Making occurs.
[55:34]
So we will have a final plan
[55:35]
that will be due in spring of 2027.
[55:38]
So we'll be accepting comments from the public.
[55:40]
We'll also get comments from DEP
[55:42]
and EPA, which will inform the final plan.
[55:46]
Okay. That gets submitted.
[55:48]
And then when that gets submitted to EP
[55:49]
and DEP in the spring, it will simultaneously be going
[55:53]
through the MEPA process.
[55:54]
So the Massachusetts Environmental Policy Act,
[55:56]
which will offer another opportunity for public comment.
[55:59]
Okay. Great. Alright, thank you. Of course.
[56:03]
And so actually before we get into the formal
[56:05]
presentation, but certainly please bring the slides up if
[56:07]
you can, just taking,
[56:10]
I guess a step back in making sure people are on the same
[56:13]
page with what A CSO is for those
[56:15]
that might not be familiar either here or in the public.
[56:20]
Many older cities in the US have a single pipe
[56:24]
that takes both stormwater, so runoff from streets and veils
[56:28]
and all that, as well as the sanitary flows into one pipe,
[56:32]
it was put in place to offer kind of a relief mechanism so
[56:36]
that there were no backups into homes businesses.
[56:39]
The flip side of that is in larger storm events,
[56:44]
you can have that discharge into the receiving water body,
[56:47]
which will be, and I do wanna stress
[56:49]
that this is a combination of storm water
[56:51]
and sanitary flows.
[56:52]
It is not just straight raw sewage going
[56:55]
into the receiving water body.
[56:56]
Just to make sure, so as I talk
[56:58]
through this presentation tonight about the combined sewer
[57:01]
overflows, use the acronym CSO, just keep in mind
[57:04]
that is a combination of both stormwater
[57:07]
as well as sanitary flows.
[57:10]
Like many decisions in infrastructure
[57:12]
and land use planning made decades ago, we are living
[57:15]
with the consequences of that
[57:17]
and looking to improve those situations.
[57:21]
So the plan that we lay out tonight that's currently in
[57:25]
for public comment does just that it improves water quality,
[57:30]
reduces the discharges of CSOs.
[57:33]
So if we can go to the next slide please.
[57:38]
So just starting with a review of what's been accomplished
[57:42]
for CSO Control to date and where we are today.
[57:46]
MWA and is for CSO member communities.
[57:48]
So, Boston, Chelsea, Cambridge,
[57:49]
and Somerville have been working
[57:51]
to reduce CSOs in the region for decades.
[57:56]
Under the Boston Harbor Project, which most
[57:57]
of you're probably familiar with, the long,
[57:59]
the first long-term control plan was implemented,
[58:01]
35 separate projects,
[58:04]
CSO control projects highlighted in the figure
[58:06]
to the right little tough to see at this scale.
[58:09]
These are all completed by 2015,
[58:12]
but the work really hasn't stopped.
[58:15]
MWA along with the CSO communities continue
[58:18]
to implement CSO reduction projects.
[58:21]
Overall investment to date on CSO control is over one
[58:24]
and a half billion dollars.
[58:27]
Next slide please. So over the past
[58:32]
35 plus years, CSOs have been reduced by approximately 88%
[58:37]
from the late eighties.
[58:39]
And 94% of what is still discharged
[58:42]
as CSO is actually treated prior to discharge.
[58:45]
It gets disinfection and then dechlorination
[58:47]
before it gets discharged to a water body.
[58:49]
So there is a bacteria removal for that
[58:53]
as shown on the bar chart chart on the right, the volume
[58:57]
of CSOs has dramatically decreased,
[59:00]
resulting in significant improvements
[59:01]
to water quality in the metro Boston area.
[59:05]
Next slide please. So the next piece
[59:09]
of the kinda CO story,
[59:11]
we've been operating under approved variances since 2004,
[59:15]
the A Life Brook, mystic River,
[59:17]
and Charles River Water, water bodies.
[59:20]
These variances are issued by DEP and EPA
[59:23]
and they allow CSO discharges to continue while the work
[59:27]
to address those and reduce the volumes also continues.
[59:31]
The most recent variance requires an updated CSO control
[59:34]
plan, which is what we're presenting tonight.
[59:38]
Those that requirement was alternatives
[59:41]
to evaluate alternatives up to including full elimination
[59:44]
of CSO discharges to the three water bodies here.
[59:48]
Next slide please. So, as I mentioned, a lot
[59:52]
of work has been done.
[59:55]
A significant number of O falls have been closed.
[59:57]
Those are indicated by the orange dot with the X through it.
[1:00:02]
Those are CSOs that have been closed.
[1:00:05]
The updated CSSO control plan is really focused on the
[1:00:08]
yellow dots on this plan, which are the L falls
[1:00:10]
that can continue to discharge to the free water bodies.
[1:00:14]
So again, a lot of progress has been made to date,
[1:00:17]
but still some work to be done.
[1:00:20]
So MWA is partnered with the city
[1:00:22]
of Somerville and the city of Cambridge.
[1:00:24]
On this initiative, we submitted a joint plan
[1:00:27]
to DEP and EPA.
[1:00:28]
So that was coming from the three partners in one plan.
[1:00:33]
Next slide please. So looking at the draft plan, the plan
[1:00:37]
as it currently stands in its draft form,
[1:00:39]
it does account for climate change.
[1:00:42]
More specifically, the impact
[1:00:43]
of future increases in precipitation.
[1:00:46]
We know we're gonna get higher annual rainfall
[1:00:48]
totals, more intense storms.
[1:00:50]
This plan is the first in the nation that we know of to
[1:00:54]
estimate the future rainfall events.
[1:00:57]
Most CSOs plans look
[1:01:00]
to the past when they're estimating their rainfall events.
[1:01:02]
We are looking into the future to mitigate those.
[1:01:06]
This plan eliminates CSOs in the 2050 typical year,
[1:01:10]
which I will note does include a sizable over three inch
[1:01:14]
storm and a 24 hour event.
[1:01:15]
So it does have some larger storms in it,
[1:01:17]
and it does reduce the volumes in the larger
[1:01:20]
storm events over that.
[1:01:22]
It also incorporates green stormwater infrastructure or GSI.
[1:01:27]
Next slide please. So the partners evaluated
[1:01:32]
39 alternatives across the three water bodies across
[1:01:35]
different levels of control.
[1:01:38]
And that included a combination of tools
[1:01:40]
at the different outfalls.
[1:01:42]
And I'll note that the evaluation really focused on
[1:01:45]
balancing the important
[1:01:47]
and sometimes competing considerations like the ones
[1:01:51]
listed on the slide.
[1:01:53]
I'll note though that the resulting water quality benefits
[1:01:55]
from the work and the protection of existing open
[1:01:59]
and recreational space,
[1:02:00]
which we already know is really limited in these areas, were
[1:02:04]
key considerations through the evaluation.
[1:02:08]
So next slide please.
[1:02:11]
So looking at the Alewife brook,
[1:02:13]
and you can go to the next Thank you.
[1:02:15]
So this is the recommended alternative in the Alewife brook.
[1:02:20]
There's a total of six outfalls owned by Cambridge,
[1:02:22]
Somerville, and MWA that currently discharge to the alewife.
[1:02:27]
The draft plan that was submitted includes a combination
[1:02:30]
of CSO control tools at those different outfalls,
[1:02:33]
including storage tanks, storage conduits,
[1:02:35]
and sewer separation.
[1:02:37]
I will note, as you look at the durations on these plans,
[1:02:40]
these are really kind of high level planning estimates of
[1:02:43]
what it would take to construct these different projects.
[1:02:46]
They're not intended to be timelines from today.
[1:02:49]
There's still a bit of work to do
[1:02:51]
before we get to that point, but I will note,
[1:02:54]
because these plans do include a series of smaller projects,
[1:02:57]
there's the opportunity
[1:02:58]
that we can get some interim benefits.
[1:03:01]
So as individual projects come online, we're seeing some of
[1:03:04]
that reduction in the CSOs while other projects are
[1:03:07]
still in the works.
[1:03:10]
Next slide please. So looking at the Mr. River. Thank you.
[1:03:15]
So there's actually only one outfall
[1:03:17]
to the upper Mystic River and it's jointly controlled by NRE
[1:03:20]
and the city of Somerville.
[1:03:22]
The draft plan here includes a combination
[1:03:25]
of sewer separation and a really large storage tank
[1:03:28]
that would be located in the parking lot of the assembly row
[1:03:32]
shopping center for those that are
[1:03:33]
familiar with that location.
[1:03:36]
Next slide please. And you can actually skip
[1:03:39]
to the alternative.
[1:03:41]
And so this is lastly looking at the Charles River.
[1:03:44]
Again, this is a combination of multiple outfalls.
[1:03:47]
The CSO controls here are a combination of sewer separation
[1:03:50]
and storage tanks, both MWA
[1:03:53]
and the city of Cambridge control out falls
[1:03:56]
discharging to the Charles River.
[1:03:59]
It Ms. Probably noting that all
[1:04:00]
of those CSO outlaw falls are downstream
[1:04:04]
of the Watertown Dam.
[1:04:05]
Yeah, correct. For a sense of geography.
[1:04:08]
Thank you. That's right. That's the next slide.
[1:04:13]
So this is just a high level summary
[1:04:15]
of the three alternatives that we just looked at.
[1:04:18]
Total cost estimated to be about $1.3 billion.
[1:04:24]
And I will note
[1:04:25]
before we go to the next slide, as noted earlier,
[1:04:28]
with the implementation of these projects
[1:04:30]
as currently proposed in the draft plan, we do see
[1:04:33]
that elimination of the CSOs in the 2050 typical year,
[1:04:37]
the reduction in the larger events,
[1:04:40]
and as compared to the projects
[1:04:42]
or looking at kind of the higher levels of control,
[1:04:44]
those five year, 25 year storm events,
[1:04:48]
this plan offers some additional
[1:04:51]
benefits in the earlier reductions in the CSOs, right,
[1:04:54]
bringing those smaller projects online.
[1:04:56]
So we're starting to see those kind of interim benefits,
[1:04:59]
less disruptive construction impacts, including
[1:05:02]
construction noise, less truck traffic as compared to some
[1:05:05]
of the higher alternatives.
[1:05:07]
And then the reduced loss of the open space.
[1:05:09]
I mentioned this earlier, including Parkland, both
[1:05:12]
during construction, but also
[1:05:14]
for the new permanent infrastructure that's going going in,
[1:05:17]
which is a high priority in trying
[1:05:18]
to preserve some of that open space.
[1:05:23]
You know? Next slide please.
[1:05:26]
So looking at the costs,
[1:05:28]
this slide focuses on just the MWA share of that
[1:05:32]
$1.3 billion.
[1:05:33]
So the MWA share is right now estimated at $763 million.
[1:05:38]
The remainder would be allocated to the city
[1:05:41]
of Cambridge and the city of Somerville.
[1:05:44]
Note that the costs that we've been talking about going
[1:05:46]
through the presentation are in today's dollars,
[1:05:49]
not in future, but when we escalate those costs
[1:05:52]
by the two point half percent annually,
[1:05:54]
which is our standard for the next 15 years
[1:05:57]
or so, that $763 million today
[1:06:01]
becomes just over a billion dollars in future spending.
[1:06:07]
And I'll note, I'm de borrows for almost all
[1:06:10]
of our construction projects,
[1:06:11]
and we would do the same for the work associated with this.
[1:06:15]
So we're issuing long-term debt
[1:06:16]
for these construction projects.
[1:06:18]
The total rate payer costs, then
[1:06:21]
that 7 63 turned into 1 billion goes into $2 billion.
[1:06:25]
When you incorporate the interest on the long-term debt,
[1:06:29]
that 2 billion is what's shown
[1:06:31]
as the green line on this chart.
[1:06:33]
So that's the draft plan as currently submitted.
[1:06:36]
As you move up in levels of control, the cost
[1:06:38]
of horse increase that top level at the 5.6 billion is
[1:06:42]
that 25 year storm event.
[1:06:44]
It's the largest event that we looked at.
[1:06:46]
So using the same methodology
[1:06:48]
that 2 billion is 5.6 billion in the larger storms,
[1:06:53]
these costs will be paid for by the MWA sewer communities,
[1:06:56]
including Needham, right?
[1:06:58]
And including Chelsea Quincy, all of the 43
[1:07:02]
MDA sewer communities would partake in these costs.
[1:07:06]
And we recognize that these sewer rate increases will be in
[1:07:11]
addition to other financial pressures
[1:07:12]
that the communities I'm sure including Needham,
[1:07:16]
are already facing the households that pay these bills.
[1:07:19]
So the MWA advisory board
[1:07:21]
who represents our member communities,
[1:07:24]
they created a dashboard that allows individual communities
[1:07:27]
to see what the impacts, what those increased costs are
[1:07:30]
for each of the levels of control that we looked at.
[1:07:32]
The three plans looking out to 2072, which is the tail end
[1:07:37]
of the projected debt service using that dashboard.
[1:07:42]
I'll give you guys kind of the bottom line of it tonight,
[1:07:44]
or the punchline using the head dashboard.
[1:07:47]
NEEDHAM'S cost for the draft plan
[1:07:49]
that is currently under review is about $28 million over
[1:07:54]
between FY 29 and 2072.
[1:07:58]
So that's for just the plan that's currently on the table
[1:08:01]
to go to the highest level of control, which is
[1:08:03]
that 25 year storm event
[1:08:05]
that is about $85 million to need for Needham.
[1:08:08]
Yeah. So adults are about $57 million from that
[1:08:13]
zero CSOs in the typical year up to that,
[1:08:15]
that 25 year storm event.
[1:08:20]
And do you know, sorry, may I ask a couple questions?
[1:08:22]
Do you know, you know, in the peak year
[1:08:25]
or the average year, what the impact would be
[1:08:29]
to a typical rate payer? So
[1:08:32]
That one's a little bit harder
[1:08:34]
and I don't know, Steve, if you,
[1:08:35]
I think there's a couple different
[1:08:36]
ways of thinking about that.
[1:08:38]
Each community needs to take their piece.
[1:08:41]
And so the advisory board's chart shows
[1:08:44]
how much the incremental cost would be to need them,
[1:08:47]
for example, in each year.
[1:08:49]
Each community needs to take that
[1:08:50]
and assume how that's going to move from their
[1:08:55]
rate structure to their rate payers,
[1:08:57]
including any other costs.
[1:08:59]
It's a fairly substantial sum of money.
[1:09:01]
The hard thing on all these things is you can always find a
[1:09:04]
way to make it a tiny little number,
[1:09:06]
but it's one way or the other.
[1:09:08]
It's a large number.
[1:09:10]
It's a couple billion dollars across the region on top
[1:09:13]
of all of the other projects we're working on, one
[1:09:17]
of the things that we've heard some of the advocates say is,
[1:09:21]
well, deer Island's being paid off.
[1:09:23]
So of course you have a lot of money.
[1:09:25]
Well, that would be true if in fact
[1:09:29]
what you built in the late 1990s could go forever
[1:09:33]
without being maintained.
[1:09:35]
We're in the midst right now of beginning to make sort
[1:09:38]
of major renovation projects on Deer Island.
[1:09:40]
We have a $300 million project looking at the clarifiers
[1:09:45]
that the treatment vessels, there's a series of projects
[1:09:48]
that are between two and $300 million on Deer Island
[1:09:51]
over the next few years.
[1:09:53]
So basically the bills
[1:09:56]
that we paid back to build the Boston Harbor project
[1:10:00]
have been mostly paid off,
[1:10:02]
but we're spending actually a pretty much the same amount
[1:10:05]
of money over the next decade or so.
[1:10:07]
Keeping that facility running, keeping Boston Harbor clean.
[1:10:11]
The same thing is true for facilities upstream of that
[1:10:14]
and in at your level, at each individual community,
[1:10:17]
there's continued investments in the wastewater pipes
[1:10:20]
to keep them from degrading
[1:10:22]
and bringing more clean water into those pipes, sending it
[1:10:26]
to Dry Island and raising your local
[1:10:28]
share of the total cost.
[1:10:29]
So that's a lot of money on the table. Yeah.
[1:10:32]
Can I ask another question? I, I guess I see this
[1:10:34]
as a public benefit project.
[1:10:36]
Like it, it doesn't benefit only the communities within
[1:10:39]
the MWRA system.
[1:10:40]
So, I mean, I almost see Needham as a much of a beneficiary
[1:10:44]
as Worcester, but
[1:10:46]
because they're not part of the MWR system,
[1:10:48]
they're not being, they don't bear any
[1:10:51]
of the costs, correct?
[1:10:53]
Yeah, I mean we would, it would be wonderful in a,
[1:10:57]
in a world in which the Commonwealth
[1:10:59]
or the US government felt
[1:11:01]
that this was a high enough priority for them
[1:11:03]
to not just require it,
[1:11:06]
but to, the reason we're doing the project is it's required
[1:11:09]
by the state and federal government,
[1:11:11]
but it was a high enough priority for them
[1:11:13]
to not just require that the 43 communities do it,
[1:11:16]
but contribute to the cost.
[1:11:18]
Most of Deer Island was paid for by the cities
[1:11:21]
and towns that fund the MWRA sewer district.
[1:11:25]
The same thing is, is likely to be true here.
[1:11:29]
I would say if you could send us a letter on this plan,
[1:11:32]
you might wanna also wanna send a letter to your, your
[1:11:36]
Senators and representatives and suggest that they do that.
[1:11:41]
The state provides us a token payment each year,
[1:11:45]
a few hundred thousand dollars towards
[1:11:48]
our almost a billion dollar water and sewer budget.
[1:11:53]
You've got a couple of more comprehensive
[1:11:57]
plans here on the table.
[1:11:59]
Can you help us understand the qualitative difference
[1:12:02]
between the plan that costs
[1:12:04]
well will cost Needham $28 million versus the plan
[1:12:09]
that will cost Needham $85 million?
[1:12:12]
Like what, what is, what are we getting
[1:12:14]
for those, don't you?
[1:12:16]
The technical one? Yes. Yeah. So those larger,
[1:12:20]
Because we do have, we do, we have had folks come in
[1:12:23]
to advocate for the larger plans.
[1:12:24]
So I wanna understand like what are we giving up? Yeah.
[1:12:27]
Or what are, what are we purchasing if we
[1:12:29]
Yep, no, that's absolutely right.
[1:12:31]
So the larger, so that $85 million plan is
[1:12:34]
for the upper level, that's the 25 year
[1:12:36]
level of control, right?
[1:12:37]
So in a 25 year event, you would have no CSO discharges
[1:12:41]
to any of the three water bodies to do that.
[1:12:44]
We are looking at a large deep tunnel
[1:12:48]
that would collect the flows and kind of carry it.
[1:12:51]
So that's where some of that large cost comes from, right?
[1:12:53]
You're building extremely large infrastructure to do this.
[1:12:57]
But I will say even with that, I know
[1:13:00]
'cause one of the talking points, which is the, you know,
[1:13:02]
fishable swimmable days in the Charles for example,
[1:13:06]
that doesn't change as you go up in the levels of control
[1:13:09]
because until
[1:13:12]
or may have heard sewer separation as one of the kind
[1:13:15]
of gold standards as well is until the stormwater
[1:13:19]
piece is really taken care of
[1:13:21]
and treated, you aren't gonna see any additional days
[1:13:25]
of swimming in the Charles
[1:13:26]
because every storm event, storm water, which is,
[1:13:29]
has pollutants in it, right?
[1:13:30]
It's not clean that goes in every storm event.
[1:13:33]
Whereas a CSO is discharged periodically
[1:13:36]
depending on how large a storm was.
[1:13:37]
So I think from a, taking the step back from a,
[1:13:40]
what you get from it,
[1:13:43]
you may see less CSO discharges in the ongoing events,
[1:13:47]
but you aren't gonna see that increase to water quality
[1:13:49]
to make that so bowl fishable the entire year
[1:13:51]
until you rarely start treating the storm water
[1:13:55]
balloons that go into it.
[1:13:57]
So that was the kind of technical part.
[1:13:58]
Yeah. One of the, one
[1:14:00]
of the difficulties in being the folks who have
[1:14:02]
to engineer the projects is you're required
[1:14:04]
to actually look in great detail at all of the issues
[1:14:09]
and think of it comprehensively.
[1:14:11]
So as I think about it, if we,
[1:14:15]
if over the next 30 years the communities in the,
[1:14:18]
the 35 communities that feed into state
[1:14:21]
of Charles River all spent many tens of billions of dollars
[1:14:25]
to com completely treat the thousands of stormwater outfalls
[1:14:30]
that go into the Charles at
[1:14:33]
that point then not having the CSO volume in a larger
[1:14:36]
storm would yield benefit.
[1:14:38]
But until all of those storm water
[1:14:41]
dirty storm water discharges into the river are res are
[1:14:44]
cleaned up, you're still on every single storm going
[1:14:49]
to have pollution in the river,
[1:14:50]
which results in it not being meeting, meeting the fishing,
[1:14:53]
the swimming bowl standards.
[1:14:55]
Now River does meet swimmable standards on quite a few days
[1:14:58]
in the year, but it doesn't meet it
[1:15:00]
for any significant rainfall, primarily in most cases
[1:15:03]
because of flows that are coming down upstream
[1:15:07]
of the Watertown Dam, which are, it's dirtier upstream,
[1:15:11]
can causing a lower portion of the river
[1:15:13]
to be not meet those standards.
[1:15:16]
The river doesn't meet standards after rainfall.
[1:15:20]
If this, even on days when the CSOs are all, when
[1:15:23]
combined source all heading to Deer Island
[1:15:25]
and none of it's making to the river,
[1:15:27]
the river's not swimable.
[1:15:29]
We really, this is a, I think that it's a, it's a long,
[1:15:33]
long, long term issue.
[1:15:35]
Nothing we're doing in this plan prohibits us
[1:15:38]
or from being able to come back
[1:15:41]
at a point when the rivers cleaner
[1:15:43]
because of all the storm water and deal with this.
[1:15:46]
But it seems like a reasonable effort to reduce the impact
[1:15:50]
that the CSOs have on the river
[1:15:52]
even without necessarily making it swimmable.
[1:15:57]
One of my things I've said at all the meetings is
[1:16:00]
folks are saying it's gonna be swimmable.
[1:16:03]
They're gonna be in an awkward spot
[1:16:07]
when we build whatever project we build.
[1:16:09]
And it's not ought
[1:16:11]
to be something more than a bumper sticker
[1:16:13]
as you're doing these kind of investments.
[1:16:15]
Okay. Bill, any questions? No, I'm good. Thank you.
[1:16:21]
All right, Kathy. Yes,
[1:16:25]
I thank you.
[1:16:26]
This has been really helpful and interesting.
[1:16:29]
I'm just looking at the list
[1:16:30]
of all the different communities
[1:16:31]
and I'm wondering how is the cost allocated
[1:16:34]
amongst those 35 communities?
[1:16:37]
So the, the MWRA sewer charges are based
[1:16:42]
primarily on flow to a, a complicated format
[1:16:46]
that includes monthly flow averaged over three years,
[1:16:51]
peak month flow averaged over three years.
[1:16:55]
Some factors for population in each community
[1:16:59]
and all the communities.
[1:17:01]
We sum all the costs
[1:17:02]
and we divide it up by your share of flow, your share
[1:17:05]
of population in essence.
[1:17:07]
So it's essentially a flow based
[1:17:09]
or impact based charge.
[1:17:13]
Each community pays their share based on those numbers.
[1:17:18]
So in that case, does Needham benefit from having some
[1:17:21]
of our water come from our town wealth?
[1:17:25]
No. Is wastewater flow waste water,
[1:17:28]
waste water flow, of course, yeah.
[1:17:29]
Your water bill is lower,
[1:17:31]
your water charge from us is lower 'cause you buy less water.
[1:17:34]
Yeah, but the sewer flow is
[1:17:35]
wastewater is based on wastewater flow.
[1:17:36]
We do meter that flow,
[1:17:37]
of course that's what leaves the town.
[1:17:39]
Okay. We would be happy to over the next couple months
[1:17:43]
provide an input your, your staff needs
[1:17:47]
as they're thinking about trafficking this
[1:17:49]
and getting a letter to you
[1:17:50]
to send off any additional information we can provide.
[1:17:53]
We'd be happy to do Thank you
[1:17:55]
for the opportunity to be here. Certainly.
[1:17:57]
And I'll just note there are two more slides in there.
[1:17:59]
I don't think they need to be pulled
[1:18:00]
up, but you have 'em in your packet.
[1:18:01]
It just shows the next steps,
[1:18:03]
which we've already touched on and then the project.
[1:18:06]
So yeah, so the next slide steps,
[1:18:08]
the comment period now is extended to end of October.
[1:18:12]
So this is a little bit outdated
[1:18:13]
that was fresh off the presses this afternoon.
[1:18:16]
And then project implementation going between the, you know,
[1:18:20]
say 2027 to the 2050s.
[1:18:21]
But noting during that timeframe some
[1:18:23]
of the smaller projects will be coming online.
[1:18:26]
And then the next slide if you could, is just the,
[1:18:30]
has the link to the joint CSO planning site that we share
[1:18:34]
with between the three partners
[1:18:37]
and folks that are interested in this program can look,
[1:18:39]
the draft plan is there, past public meetings are all
[1:18:42]
recorded, the slideshows are there.
[1:18:44]
So if anybody needs more information
[1:18:45]
and certainly we're always happy to answer questions
[1:18:47]
And that's where the the, for any cities who wants to
[1:18:50]
comment the portal
[1:18:52]
to the provide comments electronically is on that site.
[1:18:55]
All the ways to comment are there. So.
[1:18:57]
Okay. Well we, we appreciate your time.
[1:19:00]
This is a very significant project
[1:19:02]
Come In here.
[1:19:03]
So thank you much
[1:19:09]
Madam, if you apologize for having a little
[1:19:12]
trouble finding out why this won't go away.
[1:19:14]
Okay.
[1:19:20]
I give everyone a little extra time to jot it down.
[1:19:25]
Ma'am, check. Can I move the consent agenda?
[1:19:28]
Please do. Yes. All right. I move the consent agenda
[1:19:31]
Second.
[1:19:32]
Alright, so we'll
[1:19:37]
vote on the consent.
[1:19:38]
Kathy, we'll go to you. Yes. Bill? Yes.
[1:19:43]
Josh? Yes. Kevin? Yes. And I vote yes as well. Thank you.
[1:19:49]
Okay, the next item on our agenda tonight is the local
[1:19:52]
initiative program at 1 93 gar,
[1:19:56]
the Garden Street Proposal Gardener's
[1:19:59]
Nest Condominium project.
[1:20:01]
Hello. We're gonna welcome Mrs.
[1:20:06]
Toulie. Yes,
[1:20:09]
George Junta And is Mary au as well.
[1:20:12]
Okay, come on up.
[1:20:17]
So it's good to see you all back. Thank you. A joint summer.
[1:20:22]
Thank you. Thank for your time today.
[1:20:25]
So I will turn it over to you guys to present on
[1:20:30]
the project as it stands currently. Alright,
[1:20:32]
Great.
[1:20:33]
Thank you very much. George Center junior
[1:20:35]
attorney representing Mr.
[1:20:38]
Oli and his entity that own owns the property is proposing
[1:20:42]
this 40 B project.
[1:20:44]
And as the board knows,
[1:20:45]
'cause we've been here a couple of times before,
[1:20:47]
this is an ongoing process
[1:20:49]
and one of the aspects of a lip,
[1:20:51]
a local initiative project is
[1:20:54]
that it is a cooperative project.
[1:20:56]
It essentially is a form almost of a partnership
[1:20:59]
between the town and the developer.
[1:21:00]
So here we are at the next,
[1:21:03]
the next check-in if you will on this project.
[1:21:06]
So we last met and discussed this back in April.
[1:21:09]
So it's been a little bit of time
[1:21:11]
since we last talked about this.
[1:21:13]
Since then there's been a couple of things
[1:21:15]
that have taken place that directly address some
[1:21:17]
of the comments and concerns that have been raised.
[1:21:20]
First off, probably most important is the survey has been
[1:21:24]
completed, the land survey of the property,
[1:21:26]
which we hadn't had before.
[1:21:28]
We only had sort of preliminary plans and so on.
[1:21:30]
But now the survey has actually been done.
[1:21:32]
So we now know the exact dimensions of the property.
[1:21:35]
The boundaries have been fixed and most importantly the
[1:21:38]
topography has been surveyed.
[1:21:40]
So we now have the topography of the property set.
[1:21:43]
And with that I'll just mention basically
[1:21:45]
it's roughly what we thought.
[1:21:47]
That the property is relatively flat
[1:21:49]
for about three quarters of the way back ish.
[1:21:51]
And then there's a slope basically from there.
[1:21:55]
Now in addition there was a wetlands
[1:21:57]
delineation that was completed.
[1:21:59]
So Mary Trudeau who's here with us this evening, went out
[1:22:02]
and flagged the wetlands, the surveyor went
[1:22:04]
and I then located where those flags were
[1:22:06]
and that's on one of the plans
[1:22:08]
that I think you have in your packets.
[1:22:10]
So we now know with a reasonable degree of certainty
[1:22:13]
where the wetlands line is and that
[1:22:15]
therefore informs us where the buffer zone is.
[1:22:18]
The two buffer zones, the 50 foot and the a hundred foot.
[1:22:22]
We also have advanced our design.
[1:22:25]
So the prelim, the design is still not final,
[1:22:27]
it's still a bit preliminary but it's been advanced
[1:22:30]
and is still in keeping with what you have seen previously.
[1:22:34]
But basically the location of the houses
[1:22:37]
we're still proposing 10 units in five duplexes.
[1:22:40]
But the exact location has changed a bit.
[1:22:43]
The shape has changed a bit.
[1:22:45]
If you remember on one of the earlier versions there were
[1:22:48]
these little sort of cutouts where the garages were
[1:22:50]
and those have now been disposed with
[1:22:52]
and it's just a flat kind of garage face.
[1:22:55]
Instead of having cars have to come in
[1:22:57]
and negotiate these little cutout areas,
[1:23:01]
we've had discussions with the fire department
[1:23:03]
and they have given us feedback that they're looking
[1:23:05]
for a 16 to 18 foot clear space to be able
[1:23:10]
to get in with their vehicles and equipment.
[1:23:13]
And so we've taken that into account when we,
[1:23:15]
when we located the houses.
[1:23:18]
And then, let's see, yeah,
[1:23:21]
and then we've basically just tweaked the design a little
[1:23:23]
bit to sort of take into account
[1:23:25]
the information that we now have.
[1:23:27]
We still, there's still sprinkled, there's still, oh
[1:23:30]
and most recently on the fire department
[1:23:32]
they have advised us that they would like
[1:23:34]
to see the building sprinkled
[1:23:36]
and we're perfectly fine with that.
[1:23:37]
And so that's something that we'll be incorporating.
[1:23:39]
It's not in any of your materials yet
[1:23:41]
'cause we just, that was just learned that recently.
[1:23:43]
So we'll incorporate that in
[1:23:44]
and that will be a part going forward.
[1:23:47]
So as I indicated, the project remains 10 total units in
[1:23:51]
five duplexes
[1:23:53]
and while it is not a cast in stone standard,
[1:23:58]
it has generally been the rule of thumb for the board
[1:24:01]
of appeals when they evaluate 40 B projects as well
[1:24:04]
as in a general zoning context that you look
[1:24:07]
for roughly 16 units per acre as your sort
[1:24:10]
of your target maximum density.
[1:24:12]
If you do the math based on that, then you wind up
[1:24:15]
with this site would support roughly 12 units
[1:24:20]
and we are at 10 units below that.
[1:24:22]
So we, we still think
[1:24:23]
that this is an appropriate size development based on that.
[1:24:26]
Now as I said, it's not a cast and stone thing,
[1:24:28]
but it has has been a standard that has been used
[1:24:31]
to evaluate I think pretty much every 40 B
[1:24:33]
that has gone through the board of appeals.
[1:24:34]
And certainly a lot of other projects
[1:24:36]
that have come through the town as well.
[1:24:39]
30% of the units will, units will be affordable.
[1:24:43]
This is something we have now defined
[1:24:45]
and that is in excess of the 25%
[1:24:47]
that is required by Chapter 40 B.
[1:24:49]
So we're going over and above on that.
[1:24:51]
Now with the wetlands having been delineated said,
[1:24:54]
we now know where the 50 foot
[1:24:55]
and the a hundred foot buffer is for the,
[1:24:58]
for any board members that aren't aware
[1:25:00]
of the way the wetlands bylaw works
[1:25:02]
and the way the Wetlands Protection Act works,
[1:25:04]
generally speaking, towns have discretion over how much
[1:25:08]
they wanna regulate
[1:25:09]
and condition work that's done within a
[1:25:11]
hundred feet of a wetlands.
[1:25:13]
Some towns are, are sort of lenient
[1:25:16]
and they let you basically go right up to the line
[1:25:19]
and other towns are more strict.
[1:25:20]
Needham is on the stricter side of the scale.
[1:25:23]
Generally speaking, they don't want your,
[1:25:25]
they certainly don't want you touching anything
[1:25:27]
within the first 25 feet.
[1:25:28]
They really don't like anything within the first 50 feet.
[1:25:30]
But then once you get further out, basically sort of,
[1:25:34]
you know, 70, 75 feet plus you can do certain work
[1:25:38]
but you have to go through a process
[1:25:39]
to get an order of conditions from them.
[1:25:42]
And so that is something we do anticipate that we will need
[1:25:45]
to do and we're comfortable doing that
[1:25:47]
and working within the ordinary wetlands program.
[1:25:51]
So nothing, so we don't expect anything sort of
[1:25:54]
beyond the scope of what any other project
[1:25:56]
would necessarily require.
[1:25:57]
But we will be going into the buffer zone a bit up
[1:26:00]
to about 70 feet from the wellins.
[1:26:02]
So there's about 30 feet
[1:26:03]
of the buffer we'll be doing some work in.
[1:26:06]
And we now know that because of the wetlands, alienation
[1:26:08]
and the survey, we also now know based on the
[1:26:13]
information from the fire department
[1:26:16]
that they want 16 to 18 feet clear.
[1:26:17]
We've located the buildings so that the, the separation
[1:26:21]
between the wall of the building
[1:26:23]
and the property line generally is at least 18 feet,
[1:26:26]
but it's really functionally 20 feet.
[1:26:28]
So we've got adequate space there.
[1:26:30]
So we now know that previously we didn't have a set number
[1:26:33]
on that at 20 feet it is well in excess
[1:26:36]
of the 14 foot minimum side yard setback in the,
[1:26:39]
that applies in the district. So
[1:26:40]
It says 18 feet here.
[1:26:42]
Are you saying that that's changed to 20
[1:26:44]
Feet?
[1:26:45]
So it's, it's 18 feet at certain points,
[1:26:46]
but like at the garage portions it's 20 feet
[1:26:52]
with that and, and with the survey having been complete,
[1:26:54]
although we don't have a finished drainage design
[1:26:57]
that's still a bit off, we do now have a good idea
[1:27:00]
of the topography and the likely grading of the site.
[1:27:03]
So we are confident
[1:27:05]
and we don't expect needing any waivers
[1:27:08]
or any extraordinary relief when it
[1:27:10]
comes to stormwater control.
[1:27:11]
We think that we'll be able to manage that on site.
[1:27:13]
We can't say that for absolute thousand percent certain just
[1:27:17]
yet because we do have to do some test pits on the site.
[1:27:20]
But as the board is aware, I think Mr.
[1:27:22]
Toi did do the project next door,
[1:27:24]
which was substantially similar.
[1:27:25]
So he has some working knowledge of what the,
[1:27:27]
the underground conditions likely will be based on that.
[1:27:30]
And if they do turn out to be what we expect,
[1:27:32]
then we should be able to meet
[1:27:35]
and comply with the applicable stormwater bylaw
[1:27:37]
and not have to get any special relief on that front.
[1:27:44]
And then we also, now that the survey's been done
[1:27:47]
and we know the grades and the slope
[1:27:49]
and we have our sort
[1:27:50]
of first preliminary projected grading done, we know
[1:27:53]
that we likely we won't need to bring any fill to the site
[1:27:56]
and in fact we'll probably have
[1:27:57]
to remove some material from the site and take it off.
[1:28:00]
'cause there's probably gonna be too much there. All right.
[1:28:02]
Now, now that we've got all this done,
[1:28:04]
we also have a better idea of what sort
[1:28:06]
of waivers we might need.
[1:28:07]
And this was one of the questions
[1:28:08]
that the board had for us last time.
[1:28:10]
And now that we've gone through this,
[1:28:12]
we know we can cite the buildings to comply
[1:28:16]
with setback requirements.
[1:28:18]
We know that we can, they will comply with a number
[1:28:20]
of things but there are, there are a few waivers
[1:28:23]
that we definitely will need.
[1:28:25]
Three of the waivers are sort of part
[1:28:27]
and parcel with the nature of a project like this.
[1:28:29]
They're just, this is just
[1:28:30]
what you get when you have a multi-unit sort of dense
[1:28:34]
or some somewhat dense project.
[1:28:35]
So first off, we are gonna be needing a waiver on use
[1:28:39]
because this is a single family residential zoning district.
[1:28:41]
So we obviously we'll need a waiver with respect to use
[1:28:45]
in connection with that.
[1:28:46]
We'll also need a waivers for percentage of lot coverage
[1:28:50]
because in the SRB district you're limited
[1:28:53]
to only 25% and we are over that.
[1:28:55]
We'll also need a waiver from floor area ratio.
[1:28:58]
And both of those sort
[1:28:59]
of are tied part and parcel with the nature.
[1:29:01]
'cause obviously you're doing multiple units,
[1:29:04]
multiple buildings, you're gonna be over the,
[1:29:05]
the single family threshold.
[1:29:07]
And then we expect, we think
[1:29:09]
that there's a reasonable possibility
[1:29:11]
that we might need a waiver on height.
[1:29:13]
We don't know that for sure yet
[1:29:14]
because we're still working with the design on the buildings
[1:29:18]
and also on the final, the sort of the fine points
[1:29:20]
of the grading and the way height is
[1:29:23]
calculated in the bylaw.
[1:29:25]
You know, it's based on, there's a couple
[1:29:26]
of different ways you can do it
[1:29:27]
and we need
[1:29:29]
to do final calculations based on the final design
[1:29:31]
of the houses to know whether we're above the height or not.
[1:29:35]
If we are above, we don't think we're gonna be above
[1:29:37]
by a huge amount, but we may need a waiver on the height.
[1:29:40]
We just don't know yet. So I'm putting that out there just
[1:29:42]
so it's not, if we do need it,
[1:29:43]
you can't say we didn't tell you,
[1:29:45]
but other than those waivers, we don't expect
[1:29:48]
to need any other zoning related waivers.
[1:29:51]
Alright, so unlike other projects that need a laundry list,
[1:29:55]
so Chestnut Street comes to mind
[1:29:58]
that needed quite a few zoning waivers.
[1:30:00]
We really won't need a lot.
[1:30:02]
And in fact, really three three
[1:30:04]
of the four waivers we will need are, are
[1:30:07]
really essential part of the project itself.
[1:30:09]
And you would need almost regardless of size
[1:30:11]
or scope, if you're doing any sort of project like this,
[1:30:13]
you'd need those waivers.
[1:30:15]
Then we technically will also need
[1:30:17]
waivers for parking design.
[1:30:20]
Each unit is proposed to have a two car garage,
[1:30:23]
so there's adequate parking spaces.
[1:30:25]
But the way the parking design guidelines work,
[1:30:28]
there's certain things that, like the spaces are supposed
[1:30:31]
to be configured in a certain way
[1:30:32]
and having them inside a garage just they automatically
[1:30:34]
don't comply with certain aspects.
[1:30:36]
So we will need a waiver from that.
[1:30:38]
But I'll point out that an ordinary project
[1:30:42]
can ask for a waiver under the zoning bylaw anyways.
[1:30:45]
So, so needing a waiver under
[1:30:46]
that is not a unusual condition.
[1:30:48]
Many commercial projects actually request
[1:30:51]
and receive waivers for design
[1:30:53]
because the design requirements are specific.
[1:30:56]
And for example, one of them is you have to, you're supposed
[1:30:58]
to illuminate all of your parking areas,
[1:31:02]
a one foot candle per inch
[1:31:03]
and invariably many parking areas, if you do that,
[1:31:06]
you're gonna have, they're gonna be actually two bright
[1:31:08]
or you're gonna have lights where you don't want 'em.
[1:31:10]
And so typ, that's a typical waiver
[1:31:12]
that is often given in connection with projects.
[1:31:16]
And then finally a project
[1:31:18]
of this size would typically require major project site plan
[1:31:21]
review with the planning board.
[1:31:22]
And so that's a waiver that we would need more
[1:31:24]
of a procedural waiver than an actual
[1:31:26]
substantive zoning waiver.
[1:31:29]
So now we've identified sort of our base waivers.
[1:31:32]
We've got, we've, we've, we've fine tuned our project a bit.
[1:31:35]
We know what the property is, we know the grading,
[1:31:37]
we know the wetlands and so on.
[1:31:38]
So now we're at the point where we're teeing up to do more
[1:31:43]
complete drainage design and getting into that
[1:31:45]
and fine tuning our design of the houses.
[1:31:47]
So this was, this is a very good time to meet with the board
[1:31:51]
and ask for your continued input.
[1:31:53]
We know that this is a process
[1:31:55]
and it will continue to go on.
[1:31:57]
Michael has had meetings with the neighbors.
[1:31:59]
He just hit another one recently
[1:32:00]
and I expect we'll have several more as we go forward.
[1:32:02]
But we do wanna make sure to touch base with the board
[1:32:05]
because as I indicated at the outset,
[1:32:07]
this is a lip is a cooperative joint kind of project.
[1:32:10]
And if the board is inclined to support us on this, it,
[1:32:12]
it's sort of, I mean it has to be kind of a two way street
[1:32:15]
and we have to be giving the project
[1:32:17]
that the board wants on behalf of the town.
[1:32:19]
So we would love to hear your input
[1:32:22]
and any questions that you might have at this point.
[1:32:25]
Excellent. We're just gonna go down the line here
[1:32:28]
'cause I'm sure that everyone has things to say.
[1:32:31]
Kevin, do you wanna get us started?
[1:32:33]
Sure. Okay. Garages, are they underneath?
[1:32:38]
Yes. Are they? Okay.
[1:32:40]
So as I look at it, how long are these dry?
[1:32:43]
What's the, the driveways look short.
[1:32:47]
What's the pitch on them to go underneath?
[1:32:49]
Michael, do You wanna answer?
[1:32:50]
Yeah, I'm not clear on your question.
[1:32:52]
Okay. So as I'm looking at,
[1:32:54]
there's a access road coming in on either side,
[1:32:58]
then there's a proposed driveway that looks,
[1:33:01]
I don't have a measurement on the length of it.
[1:33:03]
Are we talking about the from front street
[1:33:06]
to back of property or? No, from
[1:33:08]
Side to side?
[1:33:09]
From side to side. So you gotta turn into your garage.
[1:33:12]
You have a proposed driveway
[1:33:13]
that looks like maybe it's five feet,
[1:33:17]
The, And it goes down.
[1:33:19]
So what's your pitch to clear a garage door?
[1:33:23]
So the garage floor is about four feet below the street.
[1:33:26]
Okay. So it's not, it's a,
[1:33:28]
So the rise over run is what?
[1:33:30]
But is that below?
[1:33:32]
So he's asking the driveway that comes down the side
[1:33:35]
and then the garage that comes off of that.
[1:33:37]
The difference between the, the driveway
[1:33:39]
on the side and the garage,
[1:33:41]
That's fairly level.
[1:33:42]
It'll be pitched enough to force our water to go
[1:33:46]
to our collection basis,
[1:33:49]
but it's, it, it's insignificant.
[1:33:52]
So it's not a full garage under, it's not a full floor
[1:33:54]
Under No, it, No, it's a full garage under,
[1:33:56]
but it's the, so what we're proposing is
[1:34:01]
going down four feet Yeah.
[1:34:04]
With the garage floor from the street
[1:34:07]
and then we'll be four feet above
[1:34:10]
that gives us our full eight feet.
[1:34:11]
Yeah. Underneath from the grading.
[1:34:16]
And maybe it's time to show, I don't know
[1:34:20]
if this will help any working at this.
[1:34:24]
Our grading here,
[1:34:31]
the floor is at 2 2 73.
[1:34:35]
I'm sorry. First floor is
[1:34:38]
2 73, 2 64.
[1:34:42]
We're 2 64 here.
[1:34:44]
And the street is at 2 67 above grade.
[1:34:49]
I'm sorry, what is that number? Three feet difference.
[1:34:52]
Got it. Variation of three feet from the street.
[1:34:55]
So that's a very reasonable pitch as it grades down
[1:35:00]
and as it comes down, it will
[1:35:04]
always be pitched away from the garage,
[1:35:05]
four from the garage floor.
[1:35:07]
So we'll maintain our swale on the, on the road itself
[1:35:11]
or on the, on the driveway itself
[1:35:14]
and push it to our collection basins that we'll have
[1:35:19]
Right on the driveway.
[1:35:20]
But now for a motorist going into the drive,
[1:35:23]
into the garage, they're gonna take a hard turn.
[1:35:26]
Right turn. Suppose what's the rise
[1:35:29]
over run on that driveway?
[1:35:31]
At the driveway level?
[1:35:33]
It's gonna be fairly, we will drop quickly Yeah,
[1:35:35]
from the street down to our 2 64.
[1:35:39]
Okay. So that's fairly, that's fairly flat.
[1:35:44]
So and then going into the, and going into the garage.
[1:35:47]
Yeah. So basically from the street drops down and then it's,
[1:35:50]
Yeah, it drops on essentially
[1:35:51]
At the garage level, but so there's not another Yeah.
[1:35:54]
So you're envisioning like a drop and then a drop and
[1:35:57]
No, I'm a road drop.
[1:35:58]
But I'm wondering what's our angle,
[1:36:01]
because this seems really tight. I,
[1:36:05]
It's, to answer your question, it's fairly level through.
[1:36:08]
It will be pitched. Yeah. So we can control the water. Okay.
[1:36:12]
But it'll be fairly pitched, it'll be very easy to maneuver.
[1:36:16]
You have much tighter spaces around town.
[1:36:19]
Okay. Speaking of water, so we're collecting an inch
[1:36:23]
and a half off the roof and all hardscapes, right?
[1:36:26]
Correct. So has to be, it'll be treated
[1:36:30]
as well right off the hardscapes.
[1:36:33]
Right. Okay. So in the bylaw it's three
[1:36:37]
before each S-C-S-C-M that you have,
[1:36:40]
and I'm counting, I'm just looking at them in precise map.
[1:36:44]
Okay. The plant is 36 SCM chambers. Right.
[1:36:48]
That you have on here.
[1:36:50]
A again, we haven't done our test pits,
[1:36:52]
but I know it's gravel and it's probably a one minute perk.
[1:36:57]
And if that means anything to you,
[1:36:59]
the water just basically goes through
[1:37:01]
it, it drops a foot in a minute.
[1:37:03]
Okay. And our water table, when I dug next door,
[1:37:07]
we dug down 12 feet and saw no water and no staining either.
[1:37:11]
So I'm very confident in what,
[1:37:15]
what our soil conditions are Right.
[1:37:17]
As well as our water level.
[1:37:18]
And we can contain whatever water volume we need to,
[1:37:22]
to pick up the roof and any of the hardscape.
[1:37:24]
Yeah. So, and the design right now is 36 s scms right?
[1:37:29]
On this? Yeah, that's an estimate. Okay.
[1:37:33]
It's, but there'll be calculations that we'll have
[1:37:36]
to prove out to prove exactly
[1:37:38]
what we have to do there. Alright,
[1:37:39]
So then there'll be three,
[1:37:41]
two inch cper trees per chamber, correct.
[1:37:44]
As by the bylaw.
[1:37:46]
So those, you will have by this,
[1:37:49]
you're gonna have 108 saplings on this property.
[1:37:56]
That might be a lot.
[1:37:59]
I, I could tell you we had to,
[1:38:03]
we we did a double lot in Wellesley.
[1:38:06]
Yeah. And we probably put that many on less than a half an
[1:38:11]
or about a half an acre.
[1:38:12]
Okay. Okay.
[1:38:17]
But I think you're gonna have to,
[1:38:18]
that'll be the standard to go.
[1:38:21]
There's there were also alternatives to
[1:38:23]
that if it gets too crowded, I mean we can
[1:38:26]
contribute to funds and
[1:38:28]
So let's check that out.
[1:38:31]
I'm not sure.
[1:38:36]
Okay.
[1:38:38]
Anything else Kevin? Well actually I gotta say
[1:38:41]
ultimately if you want my editorializing, I mean,
[1:38:44]
I'm interested in that part.
[1:38:45]
This just feels too dense.
[1:38:47]
It feels like five feet between buildings is too dense.
[1:38:52]
I, my, as I look at this now,
[1:38:55]
I'm really not in favor of this.
[1:38:58]
If you took out the, I don't care what you do,
[1:39:02]
but you build what you want, what you're,
[1:39:04]
what you think you can sell.
[1:39:06]
But I would remove one, the one
[1:39:11]
of the buildings and spread the other ones out
[1:39:14]
to make something a bit more breathable.
[1:39:16]
I mean, but I think it just feels for the
[1:39:21]
location for the neighborhood, it feels too tight.
[1:39:24]
It's just too dense.
[1:39:27]
And then you don't have to plan as many saplings
[1:39:30]
because you won't have, your algebra will change.
[1:39:34]
But that's my sense. I think it just feels too tight.
[1:39:38]
Okay. Josh, Thank you.
[1:39:41]
I guess I, I've said before, I'm not a fan
[1:39:43]
of the, the 40 B process.
[1:39:46]
I mean, I think we have zoning
[1:39:47]
and that that's how I'd prefer to do things.
[1:39:50]
I guess it, you know, if we,
[1:39:52]
if we do end up using this process,
[1:39:54]
I I would really first want
[1:39:56]
to get comments from town departments so that we have,
[1:39:59]
I know you've spoken with the fire department,
[1:40:00]
we haven't seen those comments
[1:40:02]
or comm from other departments.
[1:40:03]
So that, that would be something important to me
[1:40:05]
because there are a lot of tech technical aspects that I,
[1:40:08]
I'm not an expert in and I can't evaluate.
[1:40:10]
I mean, I, I do look at this map
[1:40:12]
and I see that nearly the entire
[1:40:16]
back building is within the a hundred foot wetland area.
[1:40:20]
I, I don't know how to evaluate that,
[1:40:22]
but I know that that is something the Conservation
[1:40:24]
commission would, would flag.
[1:40:29]
The other thing that that is concerning is, is the waiving
[1:40:32]
of site plan review because that is the mechanism
[1:40:35]
for the town to, to protect its interests.
[1:40:38]
I mean, we talk about, you know, the MBTA zoning
[1:40:41]
that we just put in place, even that has site plan review.
[1:40:44]
So I would not be in favor of a project that,
[1:40:47]
that seeks a waiver of all site plan review. Can,
[1:40:50]
Can I just address that one point?
[1:40:52]
Yeah. Just, just so the process is clear
[1:40:54]
and I know not all the board members have followed a 40 B
[1:40:57]
through all the way through, but it's a,
[1:41:00]
it's almost a technical waiver
[1:41:01]
because even though we ask for the waiver
[1:41:04]
of major project site plan review, what ends up happening,
[1:41:07]
we file with the board of Appeals, board
[1:41:08]
of Appeals conducts their full hearing.
[1:41:10]
And as a part of that,
[1:41:12]
the planning board issues their opinion.
[1:41:15]
And typically, especially on a project like this, we appear
[1:41:17]
before the planning board and we have a whole presentation
[1:41:19]
with them essentially in substance almost exactly like
[1:41:24]
what we would do with the major project site plan process.
[1:41:27]
Except we don't submit a site plan
[1:41:29]
application to the planning board.
[1:41:31]
They review it and they make their recommendation
[1:41:33]
to the board of appeals and then board
[1:41:34]
of appeals makes the decision.
[1:41:36]
So it doesn't technically go through site plan review,
[1:41:39]
but it, as a matter of practice, it does, you know,
[1:41:43]
in all practicality, it goes through the planning board
[1:41:45]
and it goes through engineer
[1:41:46]
and goes through all the departments.
[1:41:47]
So they comment and they review it
[1:41:50]
and that, so the concern that you're talking about, yeah,
[1:41:53]
it, that, that gets addressed in the process.
[1:41:54]
It's just in 40 bs it gets addressed a little bit
[1:41:57]
differently than it would in your
[1:41:58]
customary commercial project.
[1:42:00]
Rather than having to go to three or four
[1:42:02]
or five different boards, you go to the ZBA
[1:42:05]
and the ZBA is sort
[1:42:06]
of the collecting point for everybody else.
[1:42:09]
I, I guess, but maybe this, this goes to Kevin's point.
[1:42:11]
The reason why it triggers the major product site plan is
[1:42:13]
because of its mass, because of its scale.
[1:42:16]
And, and I guess an easy way to,
[1:42:20]
to avoid it without asking for a
[1:42:22]
waiver would be to reduce the scale.
[1:42:23]
The reason why we have that trigger is
[1:42:24]
because large projects demand more scrutiny.
[1:42:29]
I I don't disagree on that point,
[1:42:31]
but essentially anything other than a single
[1:42:35]
or, well basically certainly four units are
[1:42:38]
above would likely trigger major
[1:42:39]
project site plan review here.
[1:42:41]
'cause the threshold is low enough,
[1:42:42]
it's 10,000 square feet of area.
[1:42:44]
And so basically at,
[1:42:46]
so these units are roughly 22, 2300 square feet per
[1:42:49]
unit, four units.
[1:42:50]
You know, you're rough almost there. Right.
[1:42:52]
So probably, you know, any development
[1:42:57]
that would be in, in keeping with the size of the site
[1:43:00]
and for example, in keeping with the project
[1:43:02]
that was done next door is gonna trigger major projects like
[1:43:04]
Plan Rio just 'cause of the size.
[1:43:05]
So I'm not sure that scaling it back, like you'd have
[1:43:09]
to scale it back to like a duplex
[1:43:11]
or a single, you know, maybe three, which is kind of
[1:43:15]
almost the opposite of what the concept is here.
[1:43:19]
If I could also have Mary, maybe discuss a little bit
[1:43:23]
with the wetlands issues.
[1:43:27]
Yeah, good evening. I, as George had noted,
[1:43:32]
I had gone out and done the wetlands delineation,
[1:43:35]
which is an evaluation that looks at both soils, hydrology
[1:43:39]
and wetlands vegetation.
[1:43:42]
The wetland area is located on an adjacent property,
[1:43:47]
but that doesn't matter under the Wetlands Protection Act
[1:43:50]
because it's, it takes a holistic view of it.
[1:43:54]
In Needham, the Conservation Commission typically has a very
[1:43:58]
strict zero to 25 foot no disturb zone.
[1:44:01]
And that's just blanket across most projects
[1:44:06]
that are in front of the Conservation commission.
[1:44:08]
Because this project has a naturally wooded,
[1:44:13]
albeit filled with invasives
[1:44:15]
and non-native species slope, I believe
[1:44:18]
that the Conservation commission will impose a 50 foot
[1:44:21]
no disturbed zone on this property.
[1:44:24]
So in light of that, Mike has pulled his unit back
[1:44:28]
to about 70 feet from the edge of wetland.
[1:44:32]
As you may be aware,
[1:44:34]
the buffer zone is a regulated area.
[1:44:37]
It's not a resource area like the bordering vegetated
[1:44:40]
wetlands down at the bottom of the hill.
[1:44:42]
Those are one of the most highly protected
[1:44:44]
resources in Massachusetts.
[1:44:46]
Buffer zone is regulated
[1:44:48]
and it is protected in the sense that it is protective
[1:44:52]
of the down gradient wetlands.
[1:44:54]
So it doesn't have a strict set of performance standards
[1:44:58]
because it's supposed to be unique
[1:44:59]
and it, it looks at what's happening here.
[1:45:02]
The plan that we have proposed on this site plan,
[1:45:07]
I think is approvable
[1:45:08]
by the Needham Conservation Commission under both the local
[1:45:11]
bylaw and the State Wetlands Protection Act
[1:45:14]
that we wouldn't necessarily need any waivers at all from
[1:45:18]
their traditional book.
[1:45:21]
See, at a project like this, we will have
[1:45:26]
to meet stormwater management under the mass DEP regulations
[1:45:29]
because we're more than four units, which is an extra level
[1:45:33]
of protection above what your local bylaw has,
[1:45:37]
that it looks at several different interests
[1:45:39]
that towns typically do.
[1:45:41]
But it makes for a fairly rigorous review
[1:45:44]
by your local conservation commission.
[1:45:46]
My guess is that they probably would go out
[1:45:48]
for a third party review depending
[1:45:51]
who is on their commission right now in terms
[1:45:53]
of engineering expertise, you know, so
[1:45:55]
that you would be getting part of that site plan review
[1:45:58]
from the commission as well in their permitting process.
[1:46:03]
No, thank you for that. I, and I respect your expertise.
[1:46:06]
I think I would want to also ask for the expertise
[1:46:09]
of our director of conservation.
[1:46:10]
Oh, absolutely. Absolutely. Yeah.
[1:46:12]
No, I'm, I'm a hired gun. You know, you can talk.
[1:46:17]
All right, bill,
[1:46:19]
As you may know, we're getting a lot of comments on this,
[1:46:21]
you know, and, and some of the things that we've just heard
[1:46:24]
recently is, you know, the, you know, neighbors
[1:46:27]
and people who are nearby are concerned about you're gonna
[1:46:30]
have to build some retaining walls.
[1:46:32]
How are we gonna do that? How how's that gonna be done?
[1:46:34]
So it'll look good. It won't
[1:46:37]
infringe on the properties next door.
[1:46:39]
And the other talk about the 132 trees, that's a, that,
[1:46:43]
that all goes into screening, you know,
[1:46:44]
how how's the screening gonna be done
[1:46:46]
because, you know, the, the driveways are on this side
[1:46:49]
and that your other previous project, which is great
[1:46:51]
and you know, has been great for a long time.
[1:46:54]
You know, how, how we, how are we gonna be able
[1:46:56]
to screen some from that with, with, with some
[1:46:58]
of the concerns that, that I see.
[1:47:01]
So the, we would not require a, a retaining wall
[1:47:06]
above four feet under any circumstances anyway.
[1:47:09]
We can always slope from the other property.
[1:47:11]
I've also had some comments from one of the neighbors
[1:47:15]
that maybe we share some space in between and,
[1:47:19]
and do some landscaping in between,
[1:47:20]
which we'd be more than happy to do
[1:47:25]
the, I'm sorry, your on the,
[1:47:28]
The screening that you said.
[1:47:29]
Should you share that basic?
[1:47:32]
We, we have most of these comments
[1:47:35]
that we're hearing now are the same comments we heard when
[1:47:39]
we did Brown Whitney 24, 22 years ago.
[1:47:45]
And after it was done, everybody thought it was beautiful.
[1:47:48]
Change is always hard for people to visualize
[1:47:52]
and it seems impactful.
[1:47:54]
These buildings are only a few feet higher than the
[1:47:57]
brown Whitney buildings.
[1:47:58]
And in volume they're, they're on the first
[1:48:02]
and second floor are probably less than 15% Difference.
[1:48:07]
Times have changed. Demands have changed.
[1:48:09]
People want different things than what,
[1:48:12]
we can't just build something
[1:48:14]
and hope somebody's gonna want it.
[1:48:16]
We have to listen to the marketplace.
[1:48:18]
And we've all seen that the changes
[1:48:20]
that have come in the size of construction
[1:48:23]
that's happened over the years.
[1:48:26]
We have not led that charge on bigger properties.
[1:48:30]
We've, if you look at most of the things we build,
[1:48:33]
we build undersize
[1:48:34]
and we get punished a little bit for it financially,
[1:48:37]
but it's what we try to do.
[1:48:39]
We tried, we care about the town, we like the town, we want
[1:48:43]
to drive by something and be happy that we built it.
[1:48:48]
It we're, my family has been in this town
[1:48:51]
for a very long time, and if you drive around
[1:48:54]
and look at the different properties
[1:48:56]
that we've built over the years
[1:48:58]
and there's well over a hundred, they, the ones
[1:49:02]
that are well taken care of, which is most of them,
[1:49:06]
most people appreciate.
[1:49:07]
We, we won an award for building, for doing Brown Whitney,
[1:49:12]
and a lot of the neighbors that opposed us
[1:49:17]
ended up coming up to me later
[1:49:20]
and apologizing for all the, of what they put us through.
[1:49:26]
Now we wanna work with the neighbors
[1:49:28]
and we wanna work with the board.
[1:49:31]
Our hope was,
[1:49:32]
and the reason we came in with the five buildings
[1:49:35]
as we were trying to get that extra affordable unit for
[1:49:40]
some family that, you know, would benefit for it.
[1:49:44]
And we're in a position where, you know, if the board wants
[1:49:49]
that extra room, we're willing to do that.
[1:49:51]
If they're not, we're willing to listen to the concerns that
[1:49:55]
as well as with the neighbors on, on
[1:49:58]
how to go forward with this.
[1:50:01]
Are you all set? I I don't think the, I mean,
[1:50:03]
of course we wanna follow up our housing for everyone,
[1:50:05]
but I think the density is more important
[1:50:08]
than the affordable housing.
[1:50:10]
And we're here asking for that feedback too.
[1:50:13]
That's just my personal opinion.
[1:50:15]
Sure. Kathy?
[1:50:18]
Yes. Actually, on the point of the affordable units,
[1:50:21]
I'm interested in, in the pricing.
[1:50:25]
So the market rate units
[1:50:27]
targeted at 1.75 million
[1:50:30]
and the affordable at seven to 800,000.
[1:50:33]
Does that track to a percentage of
[1:50:37]
median area income
[1:50:39]
or how, how does that affordable number come about?
[1:50:43]
It's built around the median income of Needham.
[1:50:46]
It's designed and the, the regulation determines what
[1:50:50]
that we don't determine the price we have
[1:50:52]
to fit into whatever the town.
[1:50:54]
And, and so I put a range in there only
[1:50:57]
because I don't, I did some quick math,
[1:50:59]
but that's gonna have to be approved by right
[1:51:04]
by the, the powers to be on that.
[1:51:08]
Okay. Anything else Kathy? No, that I'm all set.
[1:51:13]
Okay. Well, for, for myself, I would say
[1:51:17]
my concern is not density.
[1:51:19]
I think that density in particular places is,
[1:51:23]
is not only okay, it's good for the town
[1:51:26]
and specifically good in this kind of configuration
[1:51:29]
where you have the sort of the central grassy area.
[1:51:32]
My concern is about the size of the buildings.
[1:51:36]
I think that there's, these houses are, are quite large
[1:51:42]
and I I do think
[1:51:44]
that they are a bit unrealistic for the space.
[1:51:47]
I guess my question is really that the,
[1:51:52]
a lip profit is limited by state statute to 20%
[1:51:56]
of the development cost.
[1:51:58]
So it seems to me,
[1:52:02]
and I'm not a real estate mogul,
[1:52:05]
but I will say that if, if you are, if you are basing
[1:52:10]
all of the, the math on your development costs
[1:52:13]
and it seems as though it might be worth your while
[1:52:16]
to consider reducing the size of the buildings,
[1:52:20]
I think personally that that would bring you into
[1:52:24]
competition for some of the folks who would like to downsize
[1:52:27]
as well as new families.
[1:52:29]
I note that the previous, the Brown Whitney development,
[1:52:34]
those, those buildings are much smaller
[1:52:37]
and we received letters from families
[1:52:40]
that moved into those houses and remain in those houses
[1:52:43]
and were able to comfortably raise families and stuff.
[1:52:46]
I do understand that modern living
[1:52:49]
perhaps has some amenities that we've all become used to,
[1:52:52]
but I do think that these do seem to be
[1:52:56]
quite large given that your profit
[1:52:59]
is hinging on your development costs.
[1:53:04]
I do wonder if, you know,
[1:53:06]
if your development costs were reduced, that
[1:53:08]
that might make it easier for you.
[1:53:09]
I think it also might make it a little easier to,
[1:53:11]
to gain this board's approval
[1:53:13]
and to gain the approval of the neighbors
[1:53:15]
because many of the letters
[1:53:16]
that we received actually indicated support for the concept.
[1:53:20]
But a feeling that the mass
[1:53:22]
of the buildings was just too much.
[1:53:25]
I mean, I I hear you about the height.
[1:53:29]
I think that height is an issue across town
[1:53:32]
and that it doesn't make sense to necessarily replicate,
[1:53:35]
you know, that we have a, a height, a,
[1:53:38]
a warrant about amending our heights across town, coming
[1:53:41]
to our special town meeting in October.
[1:53:44]
So I guess I would say that generally speaking,
[1:53:49]
I would be supportive of this project,
[1:53:51]
but I would like to see the size more
[1:53:56]
in line with what the rest of the street is.
[1:53:59]
You know, the development that you've already done next door
[1:54:02]
and the single family residences.
[1:54:04]
I mean, that would allow you a good deal more spot
[1:54:08]
for all your trees, for example.
[1:54:12]
So IIII will also say that I do have
[1:54:15]
confidence in the ZBA to run the process appropriately
[1:54:19]
to manage all the oversight that is required
[1:54:21]
and is mandated by state law.
[1:54:23]
So that to me is not an issue.
[1:54:26]
I think for me the issue is just the size,
[1:54:29]
but again, the density I think is as demonstrated
[1:54:32]
by the development next door.
[1:54:34]
Not really the issue. It's really the, the mass.
[1:54:39]
So does that give you the kind of clarity
[1:54:42]
that you need across
[1:54:43]
The board?
[1:54:44]
If I, if I could talk a little bit about the,
[1:54:45]
now we're staying under, we, we do
[1:54:49]
anticipate there's a potential of a height
[1:54:53]
adjustments coming.
[1:54:56]
We are staying under that with these buildings.
[1:54:59]
So just so you know, we did take that into consideration.
[1:55:04]
Again, we're only about 2200 square feet on,
[1:55:08]
on two floors.
[1:55:10]
The Brown Whitney doesn't have a third floor dormers
[1:55:14]
or any, there were a lot of the zoning issues that came up
[1:55:17]
that, that have have evolved since then.
[1:55:22]
And one of the things that we were trying
[1:55:25]
to do here was have a first floor bedroom
[1:55:29]
and that takes up space in footprint.
[1:55:32]
So it becomes problematic in trying to shrink it too much.
[1:55:35]
But we will take a look at it.
[1:55:37]
I'm not saying that we won't,
[1:55:38]
I'm just giving you an explanation
[1:55:39]
of why Sure. We did what we did.
[1:55:41]
I mean, I wonder if you could make that
[1:55:44]
a flexible floor plan.
[1:55:45]
So a young, an older downsizing couple could use it
[1:55:49]
as a bedroom and a family could use it
[1:55:52]
as an office, for example.
[1:55:53]
I mean, you know, it seems like there's ways to, but
[1:55:56]
That space itself, in order to include
[1:55:59]
that on a first floor
[1:56:02]
and still have a family room that works for,
[1:56:05]
for most people, we need, we need that extra space now.
[1:56:10]
We can, we can take a look at our design, we will do that.
[1:56:14]
Sure. But we're, we're just trying
[1:56:17]
to accommodate those things.
[1:56:18]
And we also saved a space for somebody
[1:56:21]
that might want an elevator coming up from the basement
[1:56:25]
to the, to that first floor level.
[1:56:30]
So if somebody wanted, they could, with the garage under,
[1:56:34]
knowing that a lot of the people
[1:56:37]
that are gonna buy these have a potential of being retirees,
[1:56:42]
don't wanna walk those stairs
[1:56:43]
or bring groceries up those stairs.
[1:56:45]
Sure. But I mean, generally I think the location is,
[1:56:48]
is terrific for this kind of development
[1:56:51]
and I I hope that you'll find a way
[1:56:53]
to make it just a little bit more palatable. Okay.
[1:56:55]
Thank you. Okay. Thanks very much
[1:56:57]
for coming in. Thank you all.
[1:56:58]
Thanks. Thank you.
[1:57:10]
Excuse me. A
[1:57:14]
I'm sticking to the chair too.
[1:57:29]
Okay. Now that it's seven 20, we'll move on
[1:57:33]
to the proposed installation of the, the Accidental Artist,
[1:57:38]
A public mural at 1299 Highland Avenue
[1:57:42]
and subbing in for Abby Bernstein
[1:57:44]
who couldn't be here Tonight will be our Deputy town manager
[1:57:49]
and our director of Economic Development.
[1:57:53]
Welcome. Thank you. Thank you.
[1:57:56]
So As you mentioned, Abby couldn't be here tonight.
[1:57:59]
She's the chair of the Needle Council for Arts
[1:58:00]
and Culture due to a family emergency.
[1:58:03]
So I just wanna be clear at the outset
[1:58:04]
that I'm very much here relaying Abby's sentiments in the
[1:58:07]
work of the NCAC.
[1:58:09]
John is our current liaison to the council,
[1:58:11]
but I had the privilege of serving as the liaison last fall
[1:58:14]
and into the early winter, which overlapped with some
[1:58:17]
of the formative steps of this project.
[1:58:18]
So I bore witness to the tremendous amount of thought, time,
[1:58:22]
care, and effort that Abby
[1:58:23]
and the council put into getting this right.
[1:58:26]
We didn't want Abby's absence
[1:58:27]
to delay the board's presentation.
[1:58:28]
Tonight, the artist is prepared to begin almost immediately,
[1:58:32]
once the remaining accounting
[1:58:34]
and administrative documents are wrapped up.
[1:58:35]
So we wanted to keep the project moving.
[1:58:38]
You have Abby's very detailed report in your packet,
[1:58:42]
which walks through the artwork.
[1:58:43]
Its symbolism, the site, community feedback,
[1:58:46]
and the evolution of the design.
[1:58:48]
So if you're looking for the artistic interpretation,
[1:58:50]
I will direct you there because I'm
[1:58:51]
decidedly not the artist in the room.
[1:58:54]
The report does a wonderful job explaining the many Needham
[1:58:56]
references incorporated into the final design,
[1:58:58]
which I think John has larger versions for you,
[1:59:03]
and the ways that the design evolved in response
[1:59:05]
to the tremendous community feedback.
[1:59:07]
What I do wanna emphasize tonight is the process,
[1:59:09]
because I think that it is an
[1:59:11]
important part of this project.
[1:59:12]
It was new territory for the NCAC.
[1:59:14]
It's their first public private partnership in public art
[1:59:17]
with the town and the Grossman company sharing both the
[1:59:20]
investment and the project and
[1:59:21]
the participation in the process.
[1:59:23]
So that meant the NCAC was trying
[1:59:25]
to apply a traditional municipal call for artists framework
[1:59:27]
to something that frankly wasn't a
[1:59:29]
traditional municipal art project.
[1:59:31]
So there were challenges along the way.
[1:59:32]
After the initial call for artists
[1:59:34]
and first round of public input, it became clear
[1:59:37]
that the process needed to evolve.
[1:59:39]
So rather than simply pushing forward the NCAC sought
[1:59:42]
guidance from the town and from the Massachusetts Cultural
[1:59:44]
Council, and they pivoted, the process was reopened.
[1:59:47]
All three original finalists, artists were compensated
[1:59:50]
for the additional work in a second round of design,
[1:59:52]
development and public input was undertaken.
[1:59:56]
I think that it's worth emphasizing
[1:59:57]
that when the original process didn't quite fit the
[1:59:59]
realities of this new partnership, the council adjusted,
[2:00:02]
they worked hard to ensure the artists
[2:00:04]
were treated equitably.
[2:00:05]
The property owner had an
[2:00:07]
appropriate voice as a true partner.
[2:00:09]
And importantly that the community's voice was heard
[2:00:10]
and reflected in the ultimate design, it went
[2:00:12]
through several iterations.
[2:00:14]
The second survey alone generated more than 50 pages
[2:00:16]
of written public feedback.
[2:00:19]
The result before you tonight is really the product
[2:00:21]
of that iterative process.
[2:00:22]
The NCAC sees this as a pilot
[2:00:24]
and hopefully a starting point.
[2:00:26]
They learned a tremendous amount about how
[2:00:27]
to navigate a public private partnership like this.
[2:00:30]
And they hope those lessons can provide a framework
[2:00:32]
for similar projects in the future as budgets
[2:00:34]
and opportunities allow.
[2:00:36]
And with that, I'm happy to answer the questions
[2:00:37]
that are within my non-artist lane.
[2:00:43]
All right, well, colleagues who,
[2:00:45]
Who owns that building again?
[2:00:46]
Grossman Companies. And so
[2:00:49]
what if they sell it tomorrow?
[2:00:52]
Is there anything in it that says you have
[2:00:54]
to keep the mural for a while or anything?
[2:00:56]
There is not in the agreement between the three parties.
[2:00:58]
No.
[2:01:01]
That's a bummer. I think that's
[2:01:03]
The same for other murals in town too, right?
[2:01:05]
Well, they're on public property.
[2:01:07]
No, if they're on private property, right? They're private.
[2:01:09]
Yeah.
[2:01:11]
So that would be like the side of the
[2:01:13]
Crest, The side of the building with the alley,
[2:01:17]
the Chapel Street there.
[2:01:18]
Yes. Thank you. Yeah.
[2:01:22]
Kathy, any comments? I, I think it's cool.
[2:01:27]
I'm excited that it's getting done.
[2:01:31]
Great, Josh. I think it's great. Yeah. Kevin,
[2:01:35]
You know, it's interesting reading
[2:01:38]
The stuff.
[2:01:39]
I understand the Grossman company didn't want a colorful
[2:01:43]
or more matic,
[2:01:45]
and this is kind of interesting to see the two,
[2:01:47]
someone tried to marry them together and it kind of works.
[2:01:52]
I get that they didn't want the brick
[2:01:53]
and it creates a weird optical effect,
[2:01:58]
but it, the color punches are kind of like,
[2:02:01]
this is what you can do with color.
[2:02:03]
And the monochromatic is of an interesting effect too. So,
[2:02:06]
And the orange is from like their logo color too,
[2:02:09]
so it makes it all work nicely. Yeah, that's
[2:02:11]
Pretty good.
[2:02:12]
All right. So it's is an interesting solution.
[2:02:17]
Well, I, I guess I'd just like to say thank you
[2:02:20]
to all of the folks involved.
[2:02:22]
I, I, you and you in your roles with the committee.
[2:02:26]
The committee obviously, and the artists.
[2:02:30]
But I, I guess I want to just
[2:02:34]
especially say thank you to the property owner.
[2:02:37]
I think it's, it's really, it's really fantastic.
[2:02:40]
I have, I feel a great deal of appreciation
[2:02:42]
to our private property owners who acknowledge
[2:02:45]
and embrace their role in bringing art into our public
[2:02:49]
spaces and acknowledging that their property as part
[2:02:53]
of the town's public space.
[2:02:57]
So their support of the arts is part of what makes
[2:03:02]
this town and towns like it.
[2:03:04]
Awesome. So I just wanna acknowledge that without the side
[2:03:09]
of the building, we wouldn't be able to do this.
[2:03:11]
So thank you to everyone involved.
[2:03:14]
Thank you. If I could, looks great.
[2:03:16]
I just add one thing too. It's great that it's right next to
[2:03:17]
that math place because there's so many kids
[2:03:19]
that are gonna be going, you know, you'll drive
[2:03:22]
by in your car and you see, but they're gonna
[2:03:24]
be walking, they're gonna be there.
[2:03:25]
It's great that it's right there for, and they're
[2:03:26]
Gonna have a little scavenger hunt type thing
[2:03:29]
that they can find the different images in
[2:03:30]
The, that's awesome.
[2:03:32]
Yeah. Excellent. Thank you. Yay. Thank you. Great project.
[2:03:36]
Thank you.
[2:03:42]
Alright, so next up we're gonna joined
[2:03:46]
by Amy Helson, our director of communications
[2:03:49]
and community engagement
[2:03:50]
to talk about a whole bunch of stuff.
[2:03:53]
So fill us in. Hi, nice to see you. Nice
[2:03:58]
To be here.
[2:03:59]
Thank you for having me.
[2:04:01]
Okay, so we are gonna start out talking about
[2:04:07]
the national community survey.
[2:04:09]
May, are you running the slide deck? I am. Okay, thank you.
[2:04:15]
So the National Community Survey,
[2:04:18]
it's basically a report about the livability of Needham.
[2:04:22]
So we've done this every two years since 2008,
[2:04:26]
with the exception of 2020
[2:04:28]
because of the pandemic we skipped that year.
[2:04:33]
So a livable community is basically a place
[2:04:35]
that's not just simply habitable, but it's desirable.
[2:04:39]
It's a place where you, where you wanna live.
[2:04:43]
And, and so the questions
[2:04:47]
that were in the National Community Survey,
[2:04:50]
this has really been perfected.
[2:04:52]
They've been doing this for so long,
[2:04:54]
and there are benchmarks.
[2:04:56]
So Needham is compared to 400 other communities nationwide
[2:05:01]
that also participate in the National Community Survey.
[2:05:05]
In addition, there are local benchmarks.
[2:05:08]
There are six Massachusetts communities that have also
[2:05:14]
done the NCS.
[2:05:15]
And so as we walk through the results,
[2:05:18]
and it's a pretty dense report.
[2:05:20]
I've already uploaded it to the town's website.
[2:05:23]
So if you go under our government
[2:05:25]
and under publications reports, it's already there.
[2:05:28]
So you can walk through
[2:05:30]
and I'm just gonna touch the highlights because
[2:05:32]
otherwise I'd be here for two hours
[2:05:34]
and I know you have a long agenda.
[2:05:37]
So, so without further ado, we'll sort of walk through
[2:05:42]
the, the key pieces of this.
[2:05:44]
So the study method, so 3000 Needham residents were invited
[2:05:48]
to participate and they are randomly chosen.
[2:05:50]
And so people received a postcard in the mail, inviting them
[2:05:54]
to participate, and they had a special URL
[2:05:57]
that they logged on to.
[2:05:59]
So that was open so that those were targeted for two weeks.
[2:06:03]
And then after two weeks, the rest
[2:06:05]
of the community was invited to participate.
[2:06:08]
Out of the 3000 residents, 562 responded to the survey,
[2:06:14]
and there's a margin of error of 4.1%,
[2:06:17]
and the response rate was about 20%.
[2:06:19]
So it's a little bit lower than it was in 2024.
[2:06:22]
And then it's also important to note
[2:06:23]
that the survey results were weighted.
[2:06:25]
So the demographic profile is more indicative of Needham.
[2:06:29]
So what that means is, if we got a glut of responses
[2:06:34]
from a certain age population,
[2:06:36]
what they would do is they take the demographics of Needham
[2:06:38]
and sort of, you know, adjust them so
[2:06:41]
that it's more representative of the demographics in town.
[2:06:46]
As I already mentioned, 400 communities
[2:06:49]
and six Massachusetts communities.
[2:06:51]
So let's jump right into the results.
[2:06:53]
So the overall highlights, good news is
[2:06:58]
97% of those responded say,
[2:07:03]
Needham is excellent
[2:07:04]
or good place to live, 93% rate,
[2:07:07]
the overall quality is excellent
[2:07:09]
or good, 81% rate, the quality
[2:07:12]
of town services provided is excellent or good.
[2:07:14]
And we'll get into how that compares
[2:07:16]
to previous years in the next couple of slides.
[2:07:19]
But there's a few things that jump out.
[2:07:22]
At first, safety, the majority of residents perceive Needham
[2:07:25]
as a very safe place to live.
[2:07:28]
And not to jump too far ahead and,
[2:07:32]
and sort of take away the, the excitement announcement,
[2:07:36]
exciting announcement is that the storm water management,
[2:07:39]
all of that hard work
[2:07:40]
that you all put into storm water management,
[2:07:43]
12% increase in satisfaction in storm water management.
[2:07:46]
So, yay.
[2:07:49]
And I'm also excited to share that with public engagement,
[2:07:53]
there was an increase from 2024 in people attending
[2:07:57]
or watching public meetings,
[2:07:59]
contacting elected officials or the town.
[2:08:02]
So overall, from those four categories,
[2:08:04]
there was a 23% increase in people's engagement
[2:08:08]
with the town, which I think is awesome.
[2:08:11]
You know, the fact that folks know how to reach out
[2:08:14]
to the town
[2:08:15]
or to elected officials, how to share their opinions
[2:08:19]
and make their voices heard is really tremendous.
[2:08:24]
So inclusivity continues to be both a strength
[2:08:26]
and an opportunity for continued growth.
[2:08:28]
Housing affordability continues to be a concern.
[2:08:32]
And governance confidence in government, local
[2:08:34]
and federal has declined.
[2:08:35]
But this is a national trend.
[2:08:37]
So it's not specific to Needham,
[2:08:40]
but it's certainly something we
[2:08:41]
of course wanna keep an eye on.
[2:08:43]
Okay, so we're gonna go to the next slide.
[2:08:46]
I'm just gonna highlight a few of these things here.
[2:08:49]
Under quality of life, as we discussed, as a place to live,
[2:08:52]
overall quality of life, those ranked very high.
[2:08:56]
So what these numbers mean is when you is the percent
[2:08:59]
positive is that 97% of the respondents said
[2:09:04]
that Needham was an Exeter a good place to live.
[2:09:06]
But what the national percentile means is that
[2:09:09]
we ranked higher than 92%
[2:09:14]
of the 400 communities.
[2:09:16]
Okay? So that means that we're on the top 8%,
[2:09:18]
which is pretty tremendous.
[2:09:21]
And then you'll see the, the changes from 2024,
[2:09:26]
because even though it's interesting to compare ourselves
[2:09:30]
to these 400 other communities, what we're really wanting
[2:09:32]
to do is compare ourselves to two years ago to see,
[2:09:35]
you know, how are we measuring up to
[2:09:37]
what we did back in 2024?
[2:09:40]
So versus the local benchmark, you can also see
[2:09:43]
how our results were.
[2:09:44]
And all of these results are, are similar
[2:09:47]
to the local benchmark, but higher in areas of overall image
[2:09:52]
or reputation is in its quality of life.
[2:09:55]
Next slide, please. Okay.
[2:09:58]
Public safety need
[2:10:01]
and ranked much higher than the national benchmark.
[2:10:04]
So we ranked higher than 98% of the communities,
[2:10:08]
which is pretty terrific.
[2:10:11]
And also, versus the local benchmark,
[2:10:13]
we also ranked higher crime prevention.
[2:10:18]
Also much higher in that,
[2:10:21]
that actually increased 4% from just two years ago.
[2:10:25]
So all of the great work
[2:10:26]
that the Needham Police Department is doing
[2:10:28]
is certainly being noticed.
[2:10:31]
And then fire prevention
[2:10:32]
and education is also higher than it was a couple
[2:10:35]
of years ago, as well as emergency preparedness.
[2:10:39]
So that's pretty, pretty interesting to note.
[2:10:44]
Okay, we're gonna go to the next one.
[2:10:45]
For governance, I was particularly excited about
[2:10:49]
public information services.
[2:10:51]
The change from 2024 was an increase of 7%.
[2:10:56]
And so we're also higher the national benchmark similar
[2:10:59]
to local, but
[2:11:01]
that's certainly trending in the right direction.
[2:11:03]
So that was great to see overall quality services
[2:11:07]
by the town, that did go down a little bit,
[2:11:11]
4% lower than it was in 2024.
[2:11:14]
The overall direction Needham is taking
[2:11:17]
was also lower than it was in 2024 by 9%.
[2:11:22]
And generally acting in the best interest of the community
[2:11:25]
also decreased by 10%.
[2:11:30]
Jumping down to towards the bottom, contacting the town
[2:11:34]
for help or information, again in an increase of 8%,
[2:11:38]
which is, which is really nice to see. Can I, yeah,
[2:11:42]
Does that mean that the, whether the respondent had
[2:11:45]
ever contacted the town,
[2:11:47]
It didn't ask if it was the first time.
[2:11:49]
It just means did you contact the town?
[2:11:51]
You know, have you contacted the town
[2:11:53]
to get more information or ask questions?
[2:11:55]
Okay, so that was an increase
[2:11:58]
of 8% from 2024.
[2:12:01]
And then the overall quality
[2:12:02]
of services from the federal government,
[2:12:04]
you can see a huge drop.
[2:12:07]
It, it's 27% in 2026,
[2:12:11]
and it's, you know, that's, that's trending nationally.
[2:12:14]
So again, while we wanna, I think keep an eye on, you know,
[2:12:19]
the results here, the acting in the best in sort the
[2:12:21]
community and the, and the, you know,
[2:12:26]
how folks feel about local government, that's, that's also
[2:12:30]
a nationwide trend.
[2:12:32]
So something to keep an eye on,
[2:12:35]
but just so that you know, it's in context that that
[2:12:39]
compared to other communities,
[2:12:40]
they're experiencing the same, that's a
[2:12:41]
30% drop on federal government,
[2:12:44]
Correct?
[2:12:46]
Yes. All right. So we're gonna jump to the economy.
[2:12:50]
The overall economic health of Needham,
[2:12:54]
it's higher than the national benchmark.
[2:12:56]
It did change a little bit from 2024,
[2:12:58]
but also versus the local benchmark, it's, it's higher.
[2:13:03]
Needham is a place to work that increased by 6%
[2:13:08]
and is is higher than the national national benchmark.
[2:13:13]
Similar to local cost of living,
[2:13:17]
you know, that continues.
[2:13:18]
That was, you know, the area,
[2:13:20]
the concern about affordability of, of Needham, it continues
[2:13:23]
to resonate in all of the surveys
[2:13:27]
that we've done in recent years.
[2:13:30]
And then health and wellness continues
[2:13:32]
to rank very high versus, you know,
[2:13:34]
in the national benchmark, very high scores on those.
[2:13:39]
Next slide please. Under mobility,
[2:13:45]
I just focused on a handful.
[2:13:47]
As I mentioned, this survey is very dense
[2:13:50]
and you can see every single one of the questions
[2:13:52]
that was asked in this survey on the report that is uploaded
[2:13:56]
to the town's website.
[2:13:59]
Interestingly, where we compare to local,
[2:14:03]
the other six local communities, the ease of parking, ease
[2:14:06]
of travel by bicycle and walking,
[2:14:08]
all ranked higher than the six communities in Massachusetts.
[2:14:14]
Stormwater management, again, 12% increase.
[2:14:19]
Kevin is Josh obviously very excited about
[2:14:22]
that, which he should be.
[2:14:23]
That's, that's terrific. And
[2:14:26]
That's perception.
[2:14:27]
I mean, like in reality, we, we passed a bylaw,
[2:14:30]
but like the actual act
[2:14:33]
of improving storm water comes a little later.
[2:14:37]
But they know you're working on it.
[2:14:38]
They know we're working on it. Exactly. Yeah.
[2:14:42]
The other thing, the overall quality
[2:14:44]
of utility infrastructure ranks higher
[2:14:49]
than the national benchmark as well.
[2:14:51]
And our drinking water ranked higher than the other six
[2:14:54]
local communities.
[2:14:55]
So next slide please.
[2:14:59]
So we go to education, arts and culture.
[2:15:04]
Not surprisingly, this is trended this way
[2:15:07]
for the last several years.
[2:15:10]
In fact, if I went back to 2008, I'm,
[2:15:13]
I'm sure it would probably show very similar results.
[2:15:16]
But the quality of K to 12 education
[2:15:19]
is much higher than the national benchmark
[2:15:22]
and higher than the six other Massachusetts communities,
[2:15:28]
community support for the arts,
[2:15:30]
it's also 68%.
[2:15:34]
So we didn't have a change from two years ago.
[2:15:39]
Public library services, again, 97%,
[2:15:43]
which is terrific.
[2:15:46]
Everybody loves the library
[2:15:48]
versus the national benchmark is also higher.
[2:15:53]
Next slide please. Okay. So community connection.
[2:15:57]
People generally feel a very good, you know,
[2:16:00]
very close sense of community.
[2:16:02]
Needham is a place to raise children. 95%.
[2:16:06]
That's pretty extraordinary.
[2:16:09]
You know, I would say a,
[2:16:10]
a change in 2% really isn't significant.
[2:16:13]
So it's not anything to I think be concerned about.
[2:16:18]
Neighbor, I loved this one.
[2:16:20]
The neighborliness of residents in Needham
[2:16:23]
higher than the national benchmark.
[2:16:25]
And it's, it's trended very similar
[2:16:29]
numbers in the last several surveys.
[2:16:33]
And then opportunities to participate in community matters
[2:16:36]
also higher than,
[2:16:40]
than the national benchmark.
[2:16:43]
Openness and acceptance of community towards people
[2:16:45]
of diverse backgrounds is also,
[2:16:51]
it, it that increased as well.
[2:16:53]
7%. And then this also, this, this last one here got me,
[2:16:58]
you know, very excited that residents campaigned to advocate
[2:17:01]
for a local issue cause or candidate that
[2:17:03]
that increased by 9%.
[2:17:05]
So I think, you know, we're,
[2:17:08]
we're seeing it trending in the right direction
[2:17:09]
that people are feeling informed
[2:17:12]
and are feeling that they have an opportunity
[2:17:15]
to be involved.
[2:17:17]
Okay. Custom questions.
[2:17:21]
So the national community survey allows us
[2:17:23]
to ask custom questions
[2:17:26]
before custom questions at the end of the survey.
[2:17:30]
So there's, because they're custom to us,
[2:17:33]
we can't compare them to any other community.
[2:17:37]
But that was interesting that the town's website actually
[2:17:42]
is the largest source of information for folks
[2:17:44]
to find out about what's going on
[2:17:46]
with the newsletter coming in behind it at just under 50%.
[2:17:50]
And then the, the, the alerts, the alert need, you know,
[2:17:54]
that's the sort of the reverse 9 1 1 and the notify me texts
[2:17:58]
and emails where folks can go to the website to sign up
[2:18:01]
for notifications on anything from a public meeting to,
[2:18:07]
you know, the, the water restrictions
[2:18:09]
or if their building is closed because of a snowstorm.
[2:18:12]
Those types of things.
[2:18:13]
So can gonna continue to push that
[2:18:16]
because I think those are really effective ways
[2:18:18]
to continue to communicate with folks.
[2:18:20]
I feel like this may be showing the bias
[2:18:22]
of the sample a little bit
[2:18:24]
because, so I mean,
[2:18:26]
all the percentages add up to more than a hundred.
[2:18:28]
So, so people are using more than one system in town.
[2:18:30]
Correct. And I wonder if that that's
[2:18:32]
how they learned about the survey to get involved.
[2:18:37]
I, I, I think sampling people
[2:18:40]
who didn't, I mean, this is hard.
[2:18:41]
People who didn't take the survey,
[2:18:42]
I think necessarily are probably less
[2:18:45]
plugged into the news channels
[2:18:47]
and so didn't know
[2:18:48]
to take the survey in the first place. It was mailed in your house
[2:18:51]
Though.
[2:18:52]
Well, yeah, 3000. The, so
[2:18:53]
what you're looking at actually are the, the,
[2:18:56]
these results are the, from the 3000 postcards Okay.
[2:18:59]
That were mailed. Okay.
[2:19:01]
So, okay, that's good then. Thank you.
[2:19:04]
And then the barriers the residents currently perceive
[2:19:06]
to living in Needham age being, you know,
[2:19:11]
the, the top one at only 31%
[2:19:15]
and you can see the rest there.
[2:19:18]
So that, that's a lot of information to share.
[2:19:22]
Again, i, I picked sort of the highlights
[2:19:24]
because there is a lot of data.
[2:19:29]
Does anybody have any questions?
[2:19:30]
Yes. Actually, just a comment.
[2:19:31]
First of all, thank you very much.
[2:19:32]
Yes, this is great about the stormwater
[2:19:37]
real credit goes to DPW.
[2:19:40]
They've done so many projects to work on this
[2:19:42]
and address issues project by project
[2:19:45]
and talk to neighborhoods.
[2:19:47]
So they, they're the ones who push those numbers up.
[2:19:51]
Good for that. Agreed.
[2:19:52]
Great. Anything else?
[2:19:56]
Anyone helpful?
[2:19:58]
You're hanging out. We have more stuff to cover.
[2:20:00]
Yes, we do, we do. Done, I'm not done.
[2:20:04]
I I have a question. Sure. For a comment.
[2:20:08]
I guess one of the worst
[2:20:11]
marks on here actually I think directly reflects on the
[2:20:13]
select board, which is the governance,
[2:20:16]
the overall direction that Needham is taking.
[2:20:19]
And generally even worse than that, I guess in my mind,
[2:20:22]
the generally acting in the best interest of the community
[2:20:25]
that we lost ground
[2:20:27]
and that our numbers are lower here than in other places.
[2:20:31]
Do we have any ideas?
[2:20:33]
I I, were there,
[2:20:35]
do people write anything or just check a box?
[2:20:37]
Do we have any ideas what this is about? So
[2:20:40]
There is no open response
[2:20:44]
ability in, in this particular survey.
[2:20:47]
So it, it was basically multiple choice.
[2:20:50]
So to expand upon that, all I can comment is that again,
[2:20:53]
this is, this is trending not only locally, but nationally.
[2:20:58]
There's a decline in trust in government across the board.
[2:21:03]
I think we see that Every, I guess putting the national
[2:21:06]
aside for a moment, I mean if we look at the six
[2:21:10]
peer communities in Massachusetts,
[2:21:12]
did they go down on these measures?
[2:21:16]
They did. They're, they rank similar
[2:21:20]
to, to where we did.
[2:21:25]
But were they lower last survey as well
[2:21:28]
That I can look into?
[2:21:30]
I can't, I don't have that date in front of me,
[2:21:32]
but I can, I can check on that for you.
[2:21:34]
Thank you.
[2:21:39]
Anything else, Kathy? No, that was it.
[2:21:43]
Okay. Okay, Moving along.
[2:21:49]
So as everybody knows, the New Town Seal was adopted
[2:21:51]
by town, meaning in May of 2026
[2:21:56]
and the New Town Seal is being rolled out.
[2:22:01]
Town manager and I met with the town clerk to
[2:22:07]
discuss and review what constitutes an official document
[2:22:11]
because the Town seal should only be used on
[2:22:14]
official town documents, whereas the New Town logo is going
[2:22:18]
to be used on other things, you know, like vehicles
[2:22:21]
and trash cans and clothing, that sort of thing.
[2:22:25]
So with the New Town Seal, one of the things
[2:22:30]
that does go on is our Town flag.
[2:22:33]
And the Town flag, as you may all know, is actually hung,
[2:22:37]
there's 351 flags from each municipality in
[2:22:41]
the Hall of Flags at the
[2:22:43]
Massachusetts State House in Boston.
[2:22:46]
And so we are going to need to replace the flag,
[2:22:50]
which I actually have here to show you,
[2:22:53]
but there's two different versions of it.
[2:22:55]
And so Katie
[2:22:56]
and I thought it would be a nice exercise to go through
[2:23:01]
to show you what the flags look like,
[2:23:03]
and then you can decide which one.
[2:23:05]
But I'm in touch with Representative Taki's office to see
[2:23:09]
how we might be able to schedule some type
[2:23:12]
of ceremonial flag raising of sorts to replace,
[2:23:16]
because, you know, in, in our lifetime, this will
[2:23:19]
probably be the only time the flag is replaced.
[2:23:26]
So, So there are two different versions.
[2:23:30]
There is the version on a white background.
[2:23:35]
This is a completely white version.
[2:23:42]
So that's What that looks like.
[2:23:46]
Front big screen TV you can talk to.
[2:23:50]
Okay. And then Her
[2:23:56]
Selectman themes request, we put it on
[2:24:02]
a Navy background
[2:24:07]
and I'll add that, you know, Kevin chaired the town branding
[2:24:12]
and Town Needham branding and Town Seal committee,
[2:24:16]
and it was many, many months worth of
[2:24:20]
conversations about the Town Seal
[2:24:23]
to, to bring us to this point.
[2:24:25]
And so now we have two options here for the flag
[2:24:28]
to be raised at the State House.
[2:24:32]
Kevin, why did you choose Blue?
[2:24:36]
I think there's a joke somewhere that a lot
[2:24:38]
of them just do the bed sheet, like, yeah, so many flags.
[2:24:40]
There's, oh, it's just another bed sheet
[2:24:42]
with a seal on it. So it's like, let's,
[2:24:44]
Let's try Blue.
[2:24:46]
IIII go to haul the flags every year for an event
[2:24:49]
and it's very hard when there's 351 flags up there
[2:24:53]
to find the flag because they're all white.
[2:24:55]
Yes. So it would be helpful, I think, to be a blue.
[2:25:00]
I mean, they have a little interactive thing
[2:25:01]
where you could press button and they say, look at,
[2:25:03]
you know, the third row up, the 12 flag down.
[2:25:05]
But even with that, when there so many white
[2:25:08]
that I would, I'm down with blue.
[2:25:10]
That one blue. All right. Yeah. Yeah.
[2:25:14]
I think blue's got my vote too.
[2:25:15]
It seems like it's got more gravitas.
[2:25:17]
I don't, you can kind of see through the white a little bit.
[2:25:20]
It, yeah, I, I'm not, I don't think it,
[2:25:24]
this is also just more our colors blue and yellow.
[2:25:27]
Gold. Gold, yeah. You know, that's good. You agree? Yeah.
[2:25:31]
Done all well, thanks. Just fix a tight Thank you, Jackie.
[2:25:35]
Kathy? Kathy, do you have a, oh, we lost Kathy.
[2:25:38]
No bed sheet. No bed sheet. All thank you. All right.
[2:25:42]
No one will also go in Powell Hall, right? Yes,
[2:25:46]
Correct.
[2:25:47]
Yes. Excellent. Okay.
[2:25:52]
All right, so moving right along
[2:25:53]
and I will try to be brief about this.
[2:25:56]
I know you have lots still on your agenda.
[2:25:59]
Just wanted to walk through some communication highlights
[2:26:01]
over the last year.
[2:26:02]
I was here just one year ago giving you an update.
[2:26:06]
So as we just talked about, worked with a need and branding
[2:26:08]
and Town Seal committee developed the new
[2:26:10]
town branding of the Town Seal.
[2:26:12]
The logo had was rolled out about a year and a half ago.
[2:26:16]
And so everything that needed to have the logo on it is,
[2:26:20]
is already does, including all of the big belly trash cans
[2:26:24]
around town, the vehicles, et cetera.
[2:26:29]
So the other highlights increased outreach
[2:26:32]
to stakeholders of the last year.
[2:26:33]
Social media followers grew by 8%.
[2:26:36]
It's so fascinating to me to, to watch, to see
[2:26:40]
what gets people excited.
[2:26:42]
One of the, you know, every,
[2:26:44]
anytime we have anything about veterans
[2:26:45]
or there's any kind of ceremony
[2:26:47]
that gets a lot of engagement.
[2:26:49]
But then last summer we actually had our new conservation
[2:26:51]
specialist saved a snapping turtle in
[2:26:56]
the reservoir along with the assistant town engineer.
[2:26:59]
And that just blew up and it was shared a million times
[2:27:01]
and people love sort of the heartwarming feel good stuff.
[2:27:04]
So any opportunity I have to be able to share sort
[2:27:08]
of the human side of,
[2:27:09]
of local government, I, I try to do that.
[2:27:11]
Our newsletter subscribers grew by 8%, which is also,
[2:27:16]
which is also great, heading in the right direction.
[2:27:19]
We still have the popup screen when you go to the website
[2:27:22]
that asks you if you want to subscribe.
[2:27:25]
If you're sick of seeing it, you could, you could hit close
[2:27:27]
and do not show again.
[2:27:28]
So it doesn't keep popping up.
[2:27:30]
And then continuing to increase the number
[2:27:33]
of social media posts
[2:27:34]
and news flashes, poco surveys
[2:27:37]
beyond the national community survey.
[2:27:40]
We, I also worked to publish
[2:27:45]
a few other surveys that, which
[2:27:46]
we're gonna get into in a second.
[2:27:47]
And then continuing to cultivate
[2:27:49]
relationships with local media.
[2:27:50]
So Needham is viewed as a valuable resource
[2:27:53]
for local news outlets.
[2:27:55]
So because we're fortunate to have, you know, NBC 10
[2:27:59]
and also WCBB Channel five here locally,
[2:28:03]
they often will call
[2:28:04]
and if they, you know, it's, it's convenient for them
[2:28:06]
to just come down, you know, Highland Avenue to
[2:28:09]
find somebody to interview.
[2:28:11]
So we often, I often get phone calls saying like, oh,
[2:28:15]
you know, we need to local sha and Carig is always wonderful
[2:28:18]
and, and in and accommodating requests for interviews,
[2:28:22]
especially during storms.
[2:28:25]
But they, they love to have the need and perspective
[2:28:29]
and also, not just because we're convenient, but also
[2:28:32]
because we're a respected source for information
[2:28:35]
and, and expertise.
[2:28:36]
So the public health department has been interviewed a lot.
[2:28:39]
And even most recently I get a call
[2:28:42]
during the first heat wave of the summer from
[2:28:47]
the assignment editor at Channel five
[2:28:48]
and said, can we do the weather broadcast
[2:28:51]
from the Rosemary pool?
[2:28:52]
And so I called Stacy Mulroy and she said, send 'em on down.
[2:28:55]
So, you know, as long as we don't have,
[2:28:58]
you know, children in the background.
[2:28:59]
So they, they just wanted a nice background
[2:29:01]
and they've also done the reservoir.
[2:29:03]
So I like to be accommodating whenever possible,
[2:29:06]
but that's a great opportunity to,
[2:29:08]
to get Needham on the map.
[2:29:10]
Alright, so jumping to communication tools, the website,
[2:29:13]
we did a re I did a refresh last September,
[2:29:18]
moved things around because I can see the Google analytics
[2:29:22]
and I kind of nerd out sometimes
[2:29:24]
and see what people are searching
[2:29:26]
and what are the most frequently visited pages.
[2:29:29]
The calendar section continues to be one of the tops.
[2:29:33]
So having it now in the top right hand corner allows people
[2:29:35]
to get the information right away that they're seeking.
[2:29:39]
So new photos, fresh graphics, we have, you know,
[2:29:42]
the hot topic buttons at the bottom
[2:29:43]
that change occasionally depending on, you know,
[2:29:46]
what is considered a hot topic at the time.
[2:29:49]
And then the how do I, you know,
[2:29:53]
letting folks find the information
[2:29:55]
quickly that they're seeking.
[2:29:57]
Like, how do I get an RTS sticker?
[2:29:59]
How do I register to vote?
[2:30:00]
How do I get a license for my dog? That sort of thing.
[2:30:04]
How do I sign up for the Memorial Park line board?
[2:30:10]
Okay, next slide please.
[2:30:14]
Okay, so newsflash and notify me.
[2:30:17]
So newsflash, I can post
[2:30:21]
newsworthy items
[2:30:22]
that we wanna get people's attention right when they go
[2:30:24]
to the website and, and folks can sign up for notifications
[2:30:28]
for, for newsflash, in fact.
[2:30:30]
So let me jump to the next thing.
[2:30:32]
Notify me if you go to the,
[2:30:33]
if it's just needham ma.gov/notify me, you can sign up for,
[2:30:37]
as I mentioned earlier, you know, public meeting notices,
[2:30:40]
water restriction alerts, that sort of thing.
[2:30:42]
But when I do news flashes to let folks know, for example,
[2:30:45]
yesterday that the
[2:30:47]
water restrictions were downgraded to level one.
[2:30:51]
I did that as a news flash and it it went out.
[2:30:55]
Okay, next slide please.
[2:30:58]
The newsletter continues to be very popular
[2:31:03]
and I, you know, check every week to see
[2:31:05]
what the open rate is
[2:31:06]
and I can tell whether or not people open it.
[2:31:08]
So if you don't open up your newsletter, I can actually
[2:31:11]
tell, I don't, I don't spy that closely.
[2:31:15]
But it, the analytics actually are, are pretty fascinating.
[2:31:18]
And I posted also to social media
[2:31:20]
and we get a lot of readers through,
[2:31:22]
through the posts of social media as well.
[2:31:25]
So we're up to about 8,000 subscribers now, which is,
[2:31:29]
which is again really awesome.
[2:31:31]
It's heading in the right direction. Okay.
[2:31:35]
Social media, we're up to about 5,700 followers.
[2:31:40]
Instagram about 3000.
[2:31:42]
Anybody who likes anything on our page, I immediately check,
[2:31:46]
it's a slight obsession of mine
[2:31:48]
to see if they actually already follow our page.
[2:31:49]
And if they don't, I immediately invite them.
[2:31:51]
So I can also see how people like our page
[2:31:55]
because they saw one of our reels or they saw a post
[2:31:59]
and then I can see actually how they came to us.
[2:32:01]
So that's kind of fascinating.
[2:32:04]
And in Blue Sky and Threads I've been asked about
[2:32:06]
that They don't currently have the ability
[2:32:09]
to be backed up on our social media archive software.
[2:32:13]
That is actually through Civic Plus.
[2:32:14]
I've asked when they're gonna do that
[2:32:16]
and I, there's no definitive date, so we don't use those
[2:32:20]
as platforms to post to because they cannot be backed up.
[2:32:23]
And so if there was ever, you know,
[2:32:24]
a FOIA request specific to that.
[2:32:27]
So that's why we don't use it. But we have handles saved.
[2:32:30]
So should, should they be integrated into social media
[2:32:34]
archive, we can start using those as well and test.
[2:32:37]
Okay. Poco surveys. Next slide please.
[2:32:42]
We just talked about National Community survey,
[2:32:45]
but we also, I also did surveys
[2:32:47]
through large house envisioned center.
[2:32:50]
That was a huge, that was about
[2:32:52]
2,800 responses to that survey.
[2:32:56]
The mural design for Highland Ave that John
[2:33:00]
and Liz were just talking about and the street design guide.
[2:33:03]
So we had about 4,200 responses through the survey,
[2:33:07]
through surveys this year.
[2:33:10]
Next slide please. In community engagement, I continue
[2:33:14]
to try to connect with local nonprofits.
[2:33:18]
They reach out to me all the time asking me
[2:33:20]
to include their information on our community calendar,
[2:33:23]
the website, and also in the newsletter.
[2:33:25]
I love to go out
[2:33:27]
and visit with the residents whenever possible.
[2:33:30]
I've now been to Wingate a couple of times
[2:33:34]
and have spoken to residents there just to talk
[2:33:37]
to them about the town, how to volunteer opportunities
[2:33:40]
or how to stay informed and engaged.
[2:33:41]
And they, they were a really, you know, excited group
[2:33:45]
of folks and they had some really great questions.
[2:33:48]
So very interested in, in, you know, projects and
[2:33:53]
because, you know, the,
[2:33:54]
the former Muzzy site is right across the street from them.
[2:33:57]
They wanna know what's going on,
[2:33:58]
but they, they have a lot of questions
[2:34:00]
and they're very well informed.
[2:34:02]
So that's been, it's been really rewarding.
[2:34:04]
So hope to do more of that in the year ahead.
[2:34:08]
So other things in process, I am working on a template
[2:34:12]
for a town wide mailing
[2:34:13]
that we are talking about doing twice a year in the
[2:34:17]
fall and in the spring.
[2:34:19]
And so it would be information that would be a preview
[2:34:23]
for folks On major initiatives, how
[2:34:28]
to stay informed, how to get involved,
[2:34:30]
how to provide their feedback.
[2:34:32]
And also if there is public, you know,
[2:34:34]
public engagement sessions coming up, it's really important
[2:34:38]
to, you know, try to get that out.
[2:34:39]
And so speaking of community engagement,
[2:34:41]
when we do have public engagement sessions,
[2:34:43]
public information sessions, it's not just the usual,
[2:34:46]
you know, throw it up on the website
[2:34:48]
or put the newsletter, it's sharing flyers, you know,
[2:34:51]
going over to the Ham housing authority
[2:34:53]
and sharing them there, bringing 'em over to the library
[2:34:55]
to cath, trying to get people, you know, where they are
[2:34:58]
and so they, they know what's going on.
[2:35:02]
So that is it in a nutshell.
[2:35:07]
I tried to be brief,
[2:35:08]
but if anybody has any questions, I am glad to answer them.
[2:35:13]
Thank you. This is quite a lot of activity. Yeah.
[2:35:19]
Much appreciated and takes some time to digest,
[2:35:23]
but much appreciated.
[2:35:24]
Great. I look forward to looking at all
[2:35:26]
of the information on the grape site. What,
[2:35:28]
What communication challenges
[2:35:31]
or hurdles do you look to overcome in the coming year?
[2:35:37]
I often say I, I don't ever wanna hear people say,
[2:35:40]
I had no idea that was going on.
[2:35:42]
So that continues to be, you know, my, my biggest challenge.
[2:35:45]
So I try to think through, you know, if you're,
[2:35:48]
if you're not on social media, if you're not subscribed
[2:35:50]
to the newsletter, you know,
[2:35:52]
how are you gonna find out about what's going on?
[2:35:54]
And we're fortunate to have, you know,
[2:35:56]
two local news outlets here in Needham that,
[2:35:59]
that folks are very well informed of,
[2:36:01]
but constantly sort of thinking outside of the box.
[2:36:03]
So, you know, doing a lot of sort
[2:36:05]
of the grassroots outreach, I think is, is effective.
[2:36:09]
So connecting with nonprofits and,
[2:36:11]
and building rapports with, with folks like that.
[2:36:13]
And, and I think generally just providing sort
[2:36:18]
of a, an opportunity for, for people to, to connect.
[2:36:23]
I, I get responses all the time from the newsletter I've
[2:36:26]
got, I've gotten suggestions on things, you know,
[2:36:28]
to improve the newsletter and I appreciate the feedback.
[2:36:31]
So I just, you know, I wish there were more hours in a day.
[2:36:34]
I would love to be able to do more, more with video, more
[2:36:39]
with, you know, feature stories.
[2:36:41]
So
[2:36:42]
Thank you.
[2:36:43]
We'll get there. Thank you. Of course.
[2:36:46]
I would just, you know, local government is a communications
[2:36:50]
business and so thank you for doing it
[2:36:52]
'cause this is a big part of what we do.
[2:36:54]
Great. Thank you.
[2:36:56]
Thank you. Alright. Excellent. Terrific. Thanks very much.
[2:36:59]
Thank you. I'm gonna propose a five minute recess
[2:37:04]
or at least I'm going to take a short recess.
[2:37:07]
So,
[2:37:14]
so we're, we're resuming our meeting
[2:37:17]
and we are here with our traffic regulation amendments
[2:37:21]
with our director of DPWK SIG
[2:37:25]
and Justin Cullen who is the chair of the
[2:37:29]
traffic safety committee.
[2:37:30]
Thank you. Traffic safety committee.
[2:37:32]
I can remember which one all.
[2:37:34]
So tell us all the things, maybe
[2:37:38]
We'll start like an overview
[2:37:40]
and then we can go into each one.
[2:37:41]
Yes please. But these are all items that have been brought
[2:37:44]
to the town through the Traffic Safety Committee.
[2:37:47]
The Traffic Safety Committee has vetted
[2:37:49]
through all these items, all the abutters have been notified
[2:37:52]
and communicated with to see if there's any concerns
[2:37:54]
about these regulations.
[2:37:56]
And relatively speaking, they're sort
[2:37:58]
of small incremental changes.
[2:38:00]
The first one you have in front of you is this a change
[2:38:02]
to a small portion of Grove Street
[2:38:05]
where there is an island in the middle of the road
[2:38:07]
and it is just delineating that the side of the road
[2:38:13]
that would typically have outbound traffic will be one way
[2:38:16]
and not two way traffic.
[2:38:18]
Okay. There Been incidents,
[2:38:23]
No specific incidents,
[2:38:24]
but then it was brought to the attention
[2:38:26]
of the TSC by Abutters.
[2:38:28]
Yeah. So there it was anecdotally it wasn't,
[2:38:30]
we didn't confirm through police
[2:38:32]
or any sort of accident data,
[2:38:33]
but it was anecdotally brought up to us
[2:38:35]
with regards to that anecdote.
[2:38:36]
It did lead to potentially
[2:38:39]
increased conflict between vehicles.
[2:38:41]
Kind Of. I see on the proposal
[2:38:44]
that you gave us property one, you know
[2:38:45]
where you're gonna place the one way signs
[2:38:48]
and if you've spoken to that homeowner,
[2:38:50]
that homeowner is who's on both sides of, he agreed
[2:38:52]
because it almost looks like he's, he if he comes outta
[2:38:56]
that driveway, I don't know whether the blockage,
[2:38:57]
but it won't matter that much
[2:38:58]
because he turned him right onto one way.
[2:39:00]
So I don't think it'll matter that much,
[2:39:02]
but I just don't know whether you've spoke the him
[2:39:04]
They're aware and they're aware of the location of the,
[2:39:08]
Just quick question on,
[2:39:13]
on the other side of the island, is that two way
[2:39:16]
or is it just, so it's, there are two ways to go on
[2:39:20]
to Charles River Street, correct?
[2:39:22]
Correct. Correct. Okay. Yes.
[2:39:25]
I mean I'm not suggesting we do a project where you just
[2:39:29]
combine the island with the other side
[2:39:32]
because that costs money but this is a sign change. Right.
[2:39:34]
I do know and obviously cares can disc it.
[2:39:37]
I know there have been talks about future project
[2:39:39]
that maybe would some sort of road improvement be done there
[2:39:42]
to either eliminate that island or do something,
[2:39:45]
but I think that's kind of like a blue sky Okay thing.
[2:39:47]
But it had been touched as that could be some sort
[2:39:49]
of geometric improvement in the future. Okay.
[2:39:52]
Seems considerably lower cost.
[2:39:54]
Yes. Right.
[2:39:56]
Yeah. Okay great.
[2:40:00]
I definitely always feel like a
[2:40:04]
dork when I come up to one of these intersections
[2:40:06]
and realize that I could have taken the two lane
[2:40:09]
but I took the one lane and now I have to go.
[2:40:11]
But it's worth it to reduce potential conflicts
[2:40:15]
between vehicles so people will learn their way
[2:40:18]
around it. Quickly enough
[2:40:20]
Madam Chair, I would move that the board vote to approve
[2:40:23]
and sign the notice of traffic regulation permit number R 26
[2:40:26]
dash oh eight dash 11 requiring that the rest,
[2:40:29]
the West fork portion of Grove Street southbound
[2:40:32]
of Charles River Street be designated as a one way street.
[2:40:34]
Second.
[2:40:36]
All right, so we'll take a vote. Kathy? Yes.
[2:40:41]
Bill? Yes. Josh? Yes. Kevin. Aye. And I vote yes as well.
[2:40:46]
So excellent.
[2:40:47]
That one is disposed of as they say next.
[2:40:52]
The next one is at the intersection of Forest Street
[2:40:57]
and Central Avenue and you'll see from the rendering
[2:41:00]
that you have, it would be adding a no turn on ri,
[2:41:04]
a red sign from central onto forest.
[2:41:07]
This is a, a crosswalk that is heavily utilized I think
[2:41:13]
oftentimes by families who are utilizing the farm next door.
[2:41:16]
We have talked to Valante about the change
[2:41:18]
and they are aware of it as well.
[2:41:22]
Okay. Does, does this walkway have one
[2:41:24]
of those lights light that light up or no,
[2:41:27]
This is a fully signaled intersection
[2:41:30]
but the issue is, is if somebody,
[2:41:32]
in theory you have a red light you can pause
[2:41:35]
and then you can go and take a right hand
[2:41:36]
Turn.
[2:41:37]
Like if it's flashing you're not gonna go.
[2:41:38]
There's no indication when you're at a typical signaled
[2:41:41]
intersection if it's for a pedestrian phase
[2:41:43]
or if it's for the opposite lane of traffic.
[2:41:45]
So there's no distinction.
[2:41:47]
It's just a regular red light that you would have
[2:41:49]
as if forest had a green light.
[2:41:51]
I mean my own and I and I haven't done traffic study
[2:41:54]
but I've seen Central Avenue in the afternoon
[2:41:56]
how far backed up it gets
[2:41:57]
and I don't know whether it's gonna back it up
[2:41:59]
more because you can't take a right turn.
[2:42:00]
It probably would be minimal. But
[2:42:03]
I do know that our traffic engineering
[2:42:07]
has taken a look at this and I know it did not send any
[2:42:10]
concerns through our engineering division.
[2:42:14]
Okay. I also know that
[2:42:16]
because of the bump out at the curb, you have to,
[2:42:19]
if you were to take a right, you have
[2:42:20]
to go into the center of the
[2:42:22]
Correct.
[2:42:23]
That was one of the concerns of why we would do this change.
[2:42:26]
Yes, you're
[2:42:30]
Given its proximity to the farm
[2:42:32]
and then I, I think the school kids,
[2:42:36]
this is a school route so I mean I think this makes sense.
[2:42:39]
I, I agree I would be worried about the backup
[2:42:42]
but for pedestrian safety it strikes me as worth where the
[2:42:46]
Trade off, if engineering did not bring
[2:42:48]
that up then it wouldn't be a concern
[2:42:49]
'cause they would probably have brought it up.
[2:42:51]
Usually when it comes to right turn on reds,
[2:42:53]
it's not like a major right congestion reducer
[2:42:56]
because you have to have the vehicle
[2:42:57]
that's teed up at the intersection at
[2:43:00]
that time wanting to take a Right.
[2:43:01]
As soon as somebody wants to go straight, forget it,
[2:43:04]
you no longer have that benefit.
[2:43:06]
Right. Okay.
[2:43:09]
So would anybody like to make a, a motion Madam
[2:43:11]
Chair?
[2:43:12]
I make a motion to the board vote to approve
[2:43:14]
and sign the notice
[2:43:15]
of traffic regulation permit number NTOR 26 dash
[2:43:20]
zero seven dash 21 requiring
[2:43:22]
that a no turn on red restriction be established
[2:43:25]
for Central Avenue southbound at the intersection
[2:43:28]
of Forest Street second.
[2:43:31]
Okay. And we'll vote again. Kathy? Yes. Bill? Yes.
[2:43:36]
Josh? Yes. Kevin Aye And I vote yes as well.
[2:43:41]
Thank you. Okay. And then the last,
[2:43:46]
The last one that we have is a parking restriction on
[2:43:48]
Greendale Avenue towards Webster Street.
[2:43:51]
The butters actually came to the TSC with a petition
[2:43:55]
to request that one side
[2:43:57]
of this section be limited for parking.
[2:44:00]
The town evaluated which side would be the least impactful.
[2:44:02]
And this side was indicated the temple has been made aware
[2:44:06]
of this particular request
[2:44:08]
and the, they've indicated that they're supportive of it.
[2:44:12]
We do know that we've talked with them regarding sort
[2:44:16]
of high holiday events or high function events when they
[2:44:18]
often engage a police detail officer anyways.
[2:44:21]
And that would be at the discretion of the detail officer
[2:44:23]
how to manage that intersection during those events.
[2:44:26]
Okay. I mean this isn't
[2:44:31]
gonna reduce the number of cars, it's just gonna move them
[2:44:34]
to park different places.
[2:44:35]
I think the concern was people getting out
[2:44:36]
of their driveways and then maneuvering, you know,
[2:44:39]
between cars staggered on either side as opposed to Correct.
[2:44:43]
Limiting the number of cars.
[2:44:46]
Okay, so if they're all parked on one side then you
[2:44:51]
have more space to go through.
[2:44:53]
I know people yeah. Yeah people on my street all the time.
[2:44:56]
People park on both sides of the street
[2:44:58]
and then you're like trying to squeeze through,
[2:45:02]
which is, can be challenging
[2:45:04]
And I think from a, you know,
[2:45:05]
an emergency vehicle access perspective, just like it was on
[2:45:09]
across from Dio Georgia jacket.
[2:45:12]
Yeah J yeah there was concern there of, you know,
[2:45:14]
cars on both sides just as like, like it came in front
[2:45:16]
of the, the select board here before this is kind of
[2:45:17]
that same scenario where you have a very narrow road
[2:45:20]
and you do have potentially a lot of cars that do park.
[2:45:23]
So for both residents as well
[2:45:25]
as the A Temple overflow. Okay.
[2:45:27]
So that makes sense Madam Chair would move
[2:45:29]
that the board vote to approve it silently notice
[2:45:31]
of traffic regulation permit number R 26 dash eight dash 11
[2:45:35]
requiring that parking be prohibited on the east side
[2:45:38]
of Greendale lab between Webster Street and Davenport Road.
[2:45:41]
Second. Thanks Bill. Thanks Kevin.
[2:45:44]
Okay, any, any more discussion?
[2:45:47]
I, I anticipate that this is going to lead to other,
[2:45:52]
like there may be knock on effects that people,
[2:45:54]
because people can't park here,
[2:45:55]
they will park on other streets
[2:45:56]
and people on those streets will come
[2:45:58]
and ask for no parking signs and,
[2:46:03]
And we'll monitor.
[2:46:04]
'cause that was actually, that was something
[2:46:05]
that came up when I think the town probably 10 years ago
[2:46:08]
started to do no parking
[2:46:10]
around commuter rail stations in order to reduce the amount
[2:46:12]
of cars that we parking during the day.
[2:46:14]
And I don't think it really manifested too much.
[2:46:17]
I think it was just like, you know,
[2:46:18]
it's the other guy was saying change is sometimes
[2:46:20]
hard, but I don't know.
[2:46:21]
We'll, we'll carefully monitor that.
[2:46:23]
But yes, that's something that I've always said at the,
[2:46:26]
at the TSC for like the 10 years that I've been on it is,
[2:46:28]
you know, we can't just put signs everywhere
[2:46:30]
but this is, you know, something that made a good case
[2:46:33]
and obviously with the temples, with the, an officer
[2:46:35]
who would be able to at least allow
[2:46:37]
that if in fact they needed overflow parking
[2:46:40]
during the high holidays
[2:46:41]
and to, to be able to manage that on,
[2:46:43]
on those few days a year I think is appropriate
[2:46:46]
And hopefully the temple can help to inform their,
[2:46:49]
The congregation Yes. Their
[2:46:50]
Congregation about the need to make sure
[2:46:53]
that emergency vehicles can pass. So
[2:46:56]
Yeah, I think the main concern that came
[2:46:57]
to the committee was really on the regular work days
[2:47:01]
and related to the childcare facility that's there.
[2:47:06]
And so what I sort of heard was it's not parked, you know,
[2:47:10]
on a regular basis on both sides of the road, it's
[2:47:13]
that people aren't thoughtful about where they park
[2:47:15]
so they don't stagger necessarily
[2:47:16]
and you get these choke points.
[2:47:18]
So by diverting everybody onto one side of the road,
[2:47:20]
you're at least creating sort of more
[2:47:21]
of an orderly system than what we currently have.
[2:47:24]
Okay. All right.
[2:47:25]
Well so we'll we'll try it
[2:47:27]
and if there's issues we'll adjust.
[2:47:29]
We'll figure Yep. Yeah. Okay. I think that makes sense.
[2:47:34]
And we have a motion on the table and a second
[2:47:37]
and so if there are no more discussions then we will go
[2:47:41]
to a vote and we'll start with Kathy.
[2:47:44]
Yes, bill? Yes, Josh? Yes. Kevin.
[2:47:47]
Aye Yes. Thank you. Thank you.
[2:47:52]
All right, fantastic.
[2:47:55]
Enjoy the rest of your evening. Thank
[2:47:57]
You.
[2:47:59]
Next we're gonna talk about Dedham Avenue intersection at
[2:48:01]
South Street and improvements.
[2:48:04]
Excellent. So I am here, Tyler is actually remote.
[2:48:07]
He had a, a situation that required him to be at home,
[2:48:11]
but we wanted to update you on the progress of a grant
[2:48:15]
that the town has applied for the town applied for the
[2:48:19]
masts local bottleneck grant.
[2:48:21]
This is the second time we've applied for the grant.
[2:48:23]
The first time we did was
[2:48:24]
for the two intersections in the
[2:48:26]
downtown on Great Plain Avenue.
[2:48:28]
Just a little bit explaining how this grant works
[2:48:32]
'cause it's a little different than some of the ones
[2:48:33]
where you're seeking specific funding.
[2:48:35]
This is sort of a engineering grant with construction sort
[2:48:39]
of as a secondary application.
[2:48:42]
The primary grant is really to look at intersections
[2:48:44]
that we have within the town that meet criteria
[2:48:46]
as identified by the state
[2:48:48]
where we feel like there might be congestion issues
[2:48:50]
or bottlenecks currently.
[2:48:51]
And then the state
[2:48:52]
and get gauges their own engineering's process
[2:48:56]
to help consult the town on what could be done
[2:48:58]
to alleviate those congestion items.
[2:49:01]
So sometimes that results in construction
[2:49:04]
and sometimes it really results in limited work
[2:49:06]
like we saw in the downtown.
[2:49:08]
So when we enter into this process,
[2:49:09]
we don't necessarily know what the outcome will be.
[2:49:13]
So when the last round came up,
[2:49:16]
Dedham Abbot South Street was on our list of intersections
[2:49:19]
to be evaluated and
[2:49:20]
because of its proximity to the highway met much
[2:49:23]
of the criteria that was identified as part of this grant.
[2:49:26]
We applied for the grant, received it,
[2:49:29]
and are in the earlier phases of the design process
[2:49:33]
after alternatives were rolled out for looking at
[2:49:36]
that intersection, including things like rotaries
[2:49:39]
or other treatments that could be used.
[2:49:41]
And we wanted to present where we are
[2:49:43]
and where we think this project will go as far
[2:49:46]
as moving forward for funding for construction.
[2:49:49]
So that I'll turn it over to Tyler.
[2:49:57]
Good evening everybody. So this project,
[2:50:01]
as Caris was explaining, is you don't need
[2:50:05]
to have identified necessarily a solution
[2:50:09]
before application.
[2:50:10]
So the, the process is intended to
[2:50:16]
address congestion issues at intersections,
[2:50:18]
but it can also incorporate improvements for
[2:50:23]
safety reasons, upgrading the technology
[2:50:27]
of the signals as a way to enhance
[2:50:33]
the performance of the intersection.
[2:50:35]
So the main changes that are proposed as part
[2:50:39]
of this project and so far we have a,
[2:50:45]
it's it's, it's more, more like a 75% design,
[2:50:48]
but essentially we have all
[2:50:50]
of the surface level infrastructure is is designed
[2:50:54]
traffic signal equipment improvements.
[2:50:58]
A lot of the equipment at the intersection is, is quite old.
[2:51:01]
You can see that it's more of the basic
[2:51:06]
technology than some
[2:51:07]
of the other signals that we have in town.
[2:51:10]
It has only magnetic loop detection at the side streets.
[2:51:16]
The side street approaches on, on South Street.
[2:51:20]
The project would propose installing
[2:51:24]
traffic camera detection in all direction that
[2:51:28]
that has 360 degree view traffic in all directions
[2:51:33]
and can actuate the signal based on inputs
[2:51:36]
from all four directions.
[2:51:38]
The other changes are the addition
[2:51:41]
of a dedicated left turn lane coming out of town
[2:51:46]
south eastbound on Dham Avenue.
[2:51:50]
That is primarily
[2:51:52]
because of the current condition where if there's cars
[2:51:56]
that are, are queuing to go
[2:51:59]
north up Dun Avenue into town from the other direction
[2:52:05]
or they're turning left onto South Street, rather
[2:52:08]
they queue up in the lane
[2:52:09]
and that can block sight lines of oncoming traffic for those
[2:52:12]
that are heading out of town.
[2:52:14]
So when you're, when you're trying
[2:52:15]
to make a left onto South Street, you kind of have
[2:52:18]
to inch into the intersection so that you can see traffic
[2:52:22]
around the, the line of cars waiting to turn left.
[2:52:25]
So having a dedicated lane with a dedicated arrow signal
[2:52:30]
would make that much safer.
[2:52:33]
The other thing is that the South Street approach coming
[2:52:38]
north eastbound across South Street to meet up
[2:52:43]
with Dunham Avenue.
[2:52:45]
Currently it is not striped as though it's two lanes,
[2:52:48]
but it functionally is acting as if it is two lanes.
[2:52:51]
And that's because of the dimensions are just short of
[2:52:57]
allowing for two standard size lanes there.
[2:53:01]
So this project would slightly adjust the dimensions, so
[2:53:05]
to allow it to be striped as a dedicated turn lane for,
[2:53:10]
for traffic turning right again heading out
[2:53:13]
of town onto D Avenue from South Street.
[2:53:17]
So this was, these recommendations were made
[2:53:20]
after traffic data was collected by the consultant
[2:53:26]
CHA that we're working with.
[2:53:29]
So the, the, the changes were modeled through traffic,
[2:53:34]
data, traffic projection software synchro
[2:53:38]
to model the,
[2:53:40]
how these changes would affect the intersection.
[2:53:43]
The other thing that's important to mention is that the,
[2:53:46]
the installation of pedestrian signals at this intersection.
[2:53:50]
So there is a, a sidewalk at the very, the end of
[2:53:55]
of Dham Avenue right in front of DPW
[2:53:58]
that currently does not lead anywhere.
[2:54:01]
This project would install
[2:54:05]
a DA compliant ramps
[2:54:06]
and pedestrian signals at that intersection
[2:54:10]
to both make the existing pedestrian traffic safer.
[2:54:15]
'cause right now we have observed people
[2:54:18]
crossing the intersection without any sort
[2:54:20]
of signal just kind of dodging traffic,
[2:54:23]
which is very unsafe.
[2:54:24]
So it would allow for
[2:54:26]
that exclusive phase when the button is pressed
[2:54:29]
and enable us to explore future connection
[2:54:34]
to Edgewater Drive neighborhood over the,
[2:54:37]
the culvert that exists there.
[2:54:40]
Those are the, the, the extent of the changes
[2:54:43]
and how they, what is involved with this project.
[2:54:47]
Currently we are in a phase where we are negotiating the
[2:54:53]
utility pole relocations, which are kind of the, the thing
[2:54:57]
that's gonna determine a lot of the project schedule.
[2:55:00]
If we're not able to get those poles moved,
[2:55:01]
then we're not gonna be able to fit all the equipment
[2:55:03]
in its intended location.
[2:55:05]
The other thing is that we're, there is a small
[2:55:10]
overlap on the corner, one of the,
[2:55:14]
the southwest corner with a property on Edgewater Drive
[2:55:19]
and we've approached that a but
[2:55:21]
and explained that this would be a small taking by the town,
[2:55:25]
so that would require
[2:55:29]
a town meeting approval of that.
[2:55:33]
So that's, that's pretty much where, where the progress
[2:55:36]
that we've made to this point.
[2:55:39]
So we're still working through those utility pole
[2:55:41]
relocations and taking,
[2:55:45]
I just wanted to add too about the
[2:55:48]
proposed projects developing off of 1 28 and Dham.
[2:55:52]
So one thing I'll just sort
[2:55:54]
of indicate is the general overall enhancements
[2:55:58]
that are gonna be made as part of this project are going
[2:56:00]
to increase the capacity
[2:56:01]
that can be processed through this intersection.
[2:56:04]
And the information that we have so far about
[2:56:06]
what the intended throughput
[2:56:08]
through this intersection will be has been conveyed
[2:56:11]
to the engineer and will be taken into
[2:56:13]
consideration as part of the design.
[2:56:17]
And Yeah, they, that information,
[2:56:20]
I'm under the impression that we also reached out to the,
[2:56:23]
to the MEPA review with some information about this new
[2:56:27]
proposed scheme.
[2:56:30]
Yes. Everything you're getting presented, Tyler asked
[2:56:33]
that we share with Mepa as an addendum to our comments
[2:56:36]
to the campus at 1 28 project. And so we've done that
[2:56:38]
Because this will be done
[2:56:39]
before that project decision's made.
[2:56:42]
Correct, yes. Okay, great.
[2:56:45]
And Tyler, I'm sorry if I missed it,
[2:56:48]
but I know that South Street is a big cyclist route.
[2:56:54]
Is there possibility of getting some of those, you know,
[2:56:57]
four feet signs
[2:56:59]
and whatever else that might need to go up
[2:57:02]
to protect those folks as this,
[2:57:05]
as this is built to carry more traffic?
[2:57:08]
So I think one of the con we,
[2:57:10]
we've had this conversation about the signage
[2:57:13]
and I think South Street's a perfect example.
[2:57:15]
I think of the concerns we've had
[2:57:17]
and it's sort of a philosoph philosophical decision, but
[2:57:21]
because of the forefoot requirement
[2:57:24]
that you must give a cyclist four feet
[2:57:26]
of clearance when you pass them,
[2:57:29]
I would say on many parts of South Street.
[2:57:32]
So sort of two things. One is you are telling people they
[2:57:35]
have to cross a double yellow line,
[2:57:37]
which they're not supposed to cross.
[2:57:39]
We know they do, but like from a truly
[2:57:42]
road control perspective, they're not supposed to cross.
[2:57:44]
And because of the topography of South Street,
[2:57:49]
which is very curved,
[2:57:51]
there are very few places where it's safe.
[2:57:53]
And I think one of the concerns we've had is that if we sign
[2:57:56]
that and somebody does give four feet of grace
[2:57:58]
to a bicyclist and they get hit on a head on collision
[2:58:01]
because there's no, there's not sufficient space
[2:58:04]
for both vehicles to fit
[2:58:06]
and also give forfeit of clearance if there isn't some,
[2:58:09]
some responsibility or liability.
[2:58:11]
So I know there are many communities
[2:58:13]
that have installed them and they felt
[2:58:14]
that this is an okay, you know, decision.
[2:58:17]
I think we at public works have been concerned about
[2:58:19]
what the implications would be
[2:58:22]
because effectively on South Street in many locations you
[2:58:26]
really have to go at the speed of a bicyclist
[2:58:28]
because there is not sufficient space to pass.
[2:58:31]
What is the speed limit on South Street? It
[2:58:34]
Varies between 30 and 25 miles an hour
[2:58:39]
30 in this section.
[2:58:41]
Yeah, I guess I'm wondering if that's appropriate, given
[2:58:46]
what you said, like the the topography
[2:58:49]
or the, the curvy nature
[2:58:50]
or the road, if you can only see far enough ahead
[2:58:54]
that you can't figure out how to safely pass,
[2:58:58]
which you know, we should all know how to do
[2:59:00]
because that's part of driving.
[2:59:03]
Then I wonder if the speed limit should potentially come
[2:59:06]
down because at that the kind of cyclist who's on that road
[2:59:12]
is not like, it's not a child
[2:59:15]
or a family cyclist, those are road bikers.
[2:59:19]
They're moving at at a reasonable speed for that
[2:59:23]
particular road for the most part.
[2:59:26]
Not all the time of course, but for the most part.
[2:59:28]
So I wonder if that's something
[2:59:30]
that we should just think about.
[2:59:33]
Yeah, the only comment I'll make is
[2:59:35]
that typically speaking you set
[2:59:37]
speed limits at 80% of the median speed.
[2:59:40]
And I'll just say anecdotally from the RFPs
[2:59:42]
or the feed speed feedback signs we've put out,
[2:59:46]
many people are going well above 30 miles
[2:59:47]
an hour in that section.
[2:59:50]
Understood. But yes,
[2:59:51]
but I don't know that that
[2:59:53]
that's something we wanna condone.
[2:59:55]
So
[2:59:57]
Other I may, I it's, I think it's just important to note
[3:00:00]
that changing the speed limit does not
[3:00:05]
necessarily on its own influence speeding behavior.
[3:00:10]
So we understood, we, you know, I think we're open
[3:00:14]
to exploring that and,
[3:00:16]
and we're not against it by any means.
[3:00:19]
I think that we just don't want to change a number
[3:00:23]
and then ev nothing really changes
[3:00:24]
and then all of a sudden we have a bunch
[3:00:26]
of non-compliant drivers who are
[3:00:29]
dangerously above the speed limit.
[3:00:31]
So we, we want to also do
[3:00:36]
that in combination with other strategies if
[3:00:38]
that's the goal is to reduce that, the functional speed.
[3:00:44]
Sure. I think generally I'm hearing can we integrate
[3:00:46]
more bicycle safety into this intersection?
[3:00:50]
Yeah, I mean, I just think that we have to acknowledge
[3:00:53]
that this in particular is, is frequented by
[3:00:59]
cyclists and one particular kind of cyclist.
[3:01:02]
So it's not, it's not like the variability
[3:01:04]
that we might talk about through other sections of town.
[3:01:08]
But just as Tyler is saying, just
[3:01:12]
because you changed the science doesn't
[3:01:14]
change the circumstance.
[3:01:15]
I think just because, you know, I mean
[3:01:17]
this condition exists, they're there,
[3:01:19]
so we should just make sure
[3:01:20]
that everyone's can be safe gentlemen,
[3:01:25]
Hang. Go ahead Bill.
[3:01:26]
So I have three questions
[3:01:29]
right now coming down South Street.
[3:01:32]
I see in the new plan actually that there's no turn on red
[3:01:35]
onto Tima, whether you're coming down south
[3:01:38]
and wanna take a right to go to Tima
[3:01:39]
or if you're coming down south
[3:01:41]
and wanna take a right into Needham, is that currently no.
[3:01:44]
Turn on red? It is for both of those, yes.
[3:01:46]
And then you were talking about the sidewalk.
[3:01:48]
The sidewalk goes in front of the DPW building
[3:01:50]
and then it just ends, doesn't it at South Street
[3:01:52]
or does it go around the corner or?
[3:01:53]
So it just ends, I'll say there's sort of two things
[3:01:56]
that are crossing people or causing people to cross.
[3:01:59]
So one is the proximity
[3:02:01]
of the boat launch across the street.
[3:02:02]
There's a lot of people who recreate
[3:02:03]
between those two locations.
[3:02:05]
So they end up sort
[3:02:06]
of having a circuit or a loop that they do.
[3:02:08]
And then the other one is really from
[3:02:10]
that community at Edgewater.
[3:02:12]
We do see a lot of people who will cut through,
[3:02:14]
they'll walk, you know, sort of on people's yards basically
[3:02:18]
to get over to that intersection and then they will cross.
[3:02:21]
One other thing I just wanted to note,
[3:02:23]
'cause you highlighted already
[3:02:25]
that we have no turn on red on South.
[3:02:27]
We do have some frequency of accidents at this intersection.
[3:02:30]
I can just say from having my building adjacent to it,
[3:02:33]
it is not uncommon to have have accidents there
[3:02:38]
and that those accidents have physically impacted the
[3:02:41]
signals and that they have hit the
[3:02:43]
signals repeatedly in the past.
[3:02:45]
And so was the goal though,
[3:02:46]
to have the crosswalk then have a sidewalk like go up south
[3:02:49]
to the both lodge or have a sidewalk go up to Edgewater?
[3:02:52]
I think that's the goal that we're looking,
[3:02:53]
we're moving towards, there are just a few pieces in place,
[3:02:57]
the culvert on South Street being the primary obstacle,
[3:03:00]
trying to figure out how we could either accommodate it in
[3:03:02]
the current right of way or cantilever it.
[3:03:04]
And then I would say the same conversation could be had on
[3:03:07]
the other side of South Street as well.
[3:03:09]
And then I notice on this map that I have in front
[3:03:12]
of me right now, it has the little planter where the welcome
[3:03:15]
to Needham sign is
[3:03:16]
and it says RET, which I hope that does not mean retire.
[3:03:19]
I don't know what that means. What? What's it mean?
[3:03:25]
It means retain. Okay, thanks.
[3:03:28]
That's what I was Good answer.
[3:03:30]
Thank you. Okay. Alright.
[3:03:32]
Alright. Josh, Bill, you answered,
[3:03:34]
you asked most of my questions.
[3:03:36]
The other one was, was about biking the,
[3:03:40]
it's particularly busy on South Street on the weekends.
[3:03:42]
The, the survey says at most four bikes per hour.
[3:03:47]
Do you know when the survey was conducted?
[3:03:49]
I'd have to defer to Tyler,
[3:03:51]
but I agree with you it's, it's more frequent on weekends,
[3:03:53]
although it comes in spurts. Yeah,
[3:03:54]
Yeah, for sure.
[3:03:56]
The groups. Yeah, there was a memo
[3:03:58]
that was distributed in your packet
[3:04:03]
that describes the observation.
[3:04:07]
I'm afraid I didn't get to
[3:04:08]
read through the whole thing. Yeah,
[3:04:09]
I it, yeah.
[3:04:10]
So the it page,
[3:04:15]
it's page four of the memo that's appended before the plans
[3:04:20]
and it says, it talks about the data collection.
[3:04:24]
It said that the, the counts were conducted Wednesday,
[3:04:28]
April 15th and April 16th, 2025. Okay,
[3:04:33]
Thank you.
[3:04:35]
And I, I know you haven't gotten a chance yet
[3:04:37]
and neither has Kathy, can I just ask,
[3:04:39]
does the grant cover the total cost of this work or
[3:04:43]
I'll have to, it's a, there's a small match from the town
[3:04:45]
but Tyler, do you just wanna go through
[3:04:47]
what the anticipated costs are?
[3:04:49]
Yep. So after the plans in your packet,
[3:04:54]
there is also a estimate
[3:04:58]
provided from the, the designer.
[3:05:02]
The total estimated total
[3:05:04]
with contingency on this project is just shy
[3:05:07]
of 700,000.
[3:05:11]
The project, the grant that we're talking about,
[3:05:15]
the bottleneck reduction grant will cover the first 500,000
[3:05:19]
of the construction if the engineer determines that to be
[3:05:25]
an a, a, an improvement either safety or
[3:05:28]
or traffic performance.
[3:05:31]
So the delta of that would would be covered
[3:05:36]
by the town through either through local funds
[3:05:40]
or through a chapter 90 allocation.
[3:05:46]
This is yet to be finalized.
[3:05:50]
Okay. And then if any
[3:05:55]
alterations to this intersection were required
[3:05:59]
or suggested for the function
[3:06:03]
of the campus at 1 28, that would be,
[3:06:08]
I'll just say like we And future.
[3:06:10]
Yeah and we've sort of talked about it internally
[3:06:12]
and you have a space limited area in which you can only
[3:06:17]
develop to a certain extent
[3:06:19]
and we believe that the design
[3:06:21]
that we're working on will maximize the throughput.
[3:06:24]
Trying to say, you know, you have a bridge on one side,
[3:06:27]
you have dead a MAV
[3:06:29]
and you have property owners on either side, right?
[3:06:31]
So you only have so much space that you could extend for
[3:06:34]
alternative turn lanes or something like that.
[3:06:36]
So we feel fairly conf confident in this design as far
[3:06:39]
as its ability to accommodate that additional traffic.
[3:06:42]
Okay, thank you Kevin.
[3:06:44]
No, this is really interesting.
[3:06:47]
I spend too much time on maps like these.
[3:06:51]
I find 'em fascinating and thank you.
[3:06:53]
This intersection's always been over for
[3:06:57]
how it was originally laid out.
[3:06:58]
It's definitely heavily used. So thank you for updating it.
[3:07:04]
Kathy, any comments? No, no questions.
[3:07:09]
Thanks. Okay, thank you.
[3:07:16]
And we'll stay with Kara's Lustig
[3:07:18]
and move on to our next item,
[3:07:21]
which is a discussion of win waste negotiations.
[3:07:27]
For this thank you for,
[3:07:28]
For this we're we're bringing up more superstars Stars
[3:07:32]
council, Dave Davidson,
[3:07:35]
deputy town manager and director of Finance.
[3:07:38]
Welcome. Thank you.
[3:07:41]
Okay, so the day that Met DeMare has been talking about
[3:07:45]
for a long time is finally coming to fruition
[3:07:48]
and our 20 year agreement with currently with wind waste
[3:07:53]
is set to expire June 30th, 2028.
[3:07:56]
That was originally negotiated as part of a large consortium
[3:08:02]
that consisted over 30 communities, all
[3:08:05]
of which have executed their own individual contracts, some
[3:08:08]
of which actually expired June 30th, 2027.
[3:08:12]
So while it feels like we are talking about this well in
[3:08:16]
advance of our contract expiring, working
[3:08:19]
with over 30 communities in order to try to negotiate
[3:08:22]
with such a large partner, we know we'll take quite a bit
[3:08:24]
of time in order to secure contracts in the time
[3:08:27]
that we need in order to have a MSW vendor.
[3:08:32]
So as I said for a little bit of history,
[3:08:36]
we have a current contract with When Waste, when we
[3:08:40]
executed it, it was a 10 year agreement
[3:08:43]
with 10 option years.
[3:08:45]
At about year eight the company was looking to sell
[3:08:48]
and so wanted to get all of its contracts in line.
[3:08:51]
So they actually opened up that extension early
[3:08:54]
so they could ex extend it for later.
[3:08:56]
As a consequence of this,
[3:08:57]
we saw a significant reduction in our tonnage tipping fee
[3:09:02]
to the point where the tipping fee last year was the first
[3:09:05]
time that it matched what our tipping fee was 12 years ago.
[3:09:08]
So it took us 12 years to catch back up to where we were.
[3:09:11]
Very few things when you are purchasing do you get to take
[3:09:14]
that much of a cut and for that long.
[3:09:17]
That being said, we are acutely aware
[3:09:19]
that we are likely paying under market value
[3:09:23]
for our MSW
[3:09:25]
and that we are anticipating an increase,
[3:09:27]
which we've been discussing for several years.
[3:09:29]
About a year ago, all the communities that were part
[3:09:32]
of the original agreement met to try to discuss
[3:09:34]
how we wanted to move forward.
[3:09:36]
We've actually had the addition of about three communities
[3:09:38]
come into that group who are not part of it and we had one
[3:09:42]
or two smaller communities leave.
[3:09:44]
Part of the constraints and the concerns
[3:09:45]
that we have about the waste industry in Massachusetts is
[3:09:49]
there are no new landfills.
[3:09:50]
Most of them are being permitted to close
[3:09:52]
or beyond their permit.
[3:09:53]
We have no new waste energy facilities being created
[3:09:57]
and there's not less trash being generated in the state.
[3:10:00]
So we have waste and we need to figure out where to go.
[3:10:04]
The AL option alternatives we have to,
[3:10:06]
our current contract are really to ship that waste out
[3:10:11]
of state on freight largely to Ohio and New York.
[3:10:16]
So all the communities that have come together
[3:10:19]
have been discussing how we as a group can come together
[3:10:21]
to negotiate with win.
[3:10:23]
As I mentioned, it was about 20 years ago,
[3:10:25]
we lasted our major negotiation
[3:10:27]
and as you can imagine, many of the players that were part
[3:10:29]
of that contract to be their transition positions
[3:10:31]
or are no longer employ, you know, they're all retired.
[3:10:34]
So we've been trying to figure out
[3:10:36]
and uncover some documentation about the method
[3:10:38]
that we used 20 years ago to get this consortium together.
[3:10:43]
We ended up discussing
[3:10:44]
and talking to the firm that represented this group
[3:10:47]
20 years ago, KP Law.
[3:10:49]
And their recommendation was
[3:10:51]
to do an interm municipal agreement with Walpole
[3:10:54]
and have Walpole manage the contract with KP Law
[3:10:57]
for Legal Guidance.
[3:10:59]
The group that I'm referring to has created a subcommittee
[3:11:03]
that consists of seven different communities.
[3:11:05]
Needham is one of those seven communities
[3:11:08]
and that subcommittee is gonna be the committee
[3:11:10]
in charge of negotiations.
[3:11:11]
So it is intended
[3:11:13]
that these municipal representatives will be doing the
[3:11:16]
primary negotiation
[3:11:17]
and that the legal expertise that we're soliciting is really
[3:11:21]
to provide legal background and clarity for us.
[3:11:25]
So with that I am asking the ability
[3:11:27]
to join in this interim municipal agreement with Walpole
[3:11:30]
so they can then contract with KP law.
[3:11:33]
So that as in, first of all, we are trying to figure out
[3:11:37]
how many communities are really
[3:11:39]
willing to commit to move forward.
[3:11:41]
We have given all the communities the deadline
[3:11:43]
of August 31st to try to start our negotiations in earnest.
[3:11:49]
And second of all, so we can start engaging
[3:11:52]
with win wind waste.
[3:11:54]
We haven't started any formal negotiations with them.
[3:11:57]
They have given us a tour of the facility so we can sort
[3:11:59]
of see the condition of, of what they have,
[3:12:01]
what their capital plans are
[3:12:04]
and kind of what benefit we have.
[3:12:07]
One of the things I'll note is
[3:12:10]
that while when waste is a very large entity
[3:12:13]
and they have a significant foothold in the waste industry,
[3:12:17]
this particular contract has a high value to them,
[3:12:21]
we provide the sort of sta stable waste
[3:12:26]
in this organi in this entity.
[3:12:28]
They get a lot of construction waste
[3:12:29]
or other large commercial waste.
[3:12:31]
But MSW is sort of that like consistent feed slow burn
[3:12:35]
for the incinerator that helps them meet their energy
[3:12:37]
guidelines that they're supposed to to secure.
[3:12:41]
And I just wanted to articulate,
[3:12:42]
the two largest players in this group are Newton
[3:12:45]
and Worcester as in terms of size
[3:12:47]
and in terms of waste generation.
[3:12:51]
Needham is the seventh largest community as part
[3:12:54]
of this consortium, but I will indicate we are the fourth
[3:12:56]
largest in terms of waste generation.
[3:12:59]
Part of that is because we have become somewhat
[3:13:02]
of a regional area for commercial waste.
[3:13:04]
So we're taking in waste not just from residents,
[3:13:06]
but we're also taking it from commercial haulers
[3:13:10]
and source other people.
[3:13:11]
And many of several of the other communities
[3:13:13]
of comparable size to Needham have large,
[3:13:16]
larger apartment complexes than Needham does,
[3:13:18]
in which they have private entities
[3:13:20]
that remove the waste and not the town.
[3:13:24]
Okay. That's a lot of information. Kevin, you could
[3:13:28]
You all without notes.
[3:13:29]
Okay. A few notes. No, this sounds like it makes sense.
[3:13:34]
I'm happy we got the ball going and it sounds reasonable.
[3:13:39]
So yeah.
[3:13:41]
Josh, you wanna, So this is just to negotiate,
[3:13:48]
my understanding is like there would be individual contracts
[3:13:50]
still between each municipality and wind waste.
[3:13:53]
Would, would they have the same terms between all
[3:13:56]
of the municipalities or is that subject to negotiation?
[3:13:58]
So I think the intent is for them to have the same terms.
[3:14:02]
You have many different communities
[3:14:03]
who operate significantly different models.
[3:14:06]
So you have communities that are fully
[3:14:10]
municipally run in our transfer stations,
[3:14:14]
all indicate Wellesley was not part of this in the past.
[3:14:17]
They are looking to join as part of this program
[3:14:19]
because of the capacity issues they have at
[3:14:21]
the landfill they have contracted with.
[3:14:24]
So you have those, the model similar to Needham,
[3:14:28]
we send our materials there on oversized trucks.
[3:14:34]
You then have communities
[3:14:36]
that run their own collection services
[3:14:39]
and then they go there and haul.
[3:14:40]
They usually go there twice a day as part
[3:14:43]
of their regular routes.
[3:14:44]
And then you have communities that outsource their hauling
[3:14:48]
and collect to this location.
[3:14:50]
So the reason that we would all execute is our
[3:14:53]
physical delivery is different.
[3:14:54]
I will say for the original
[3:14:56]
contract, the terms were all the same. Okay,
[3:14:58]
Thank you Bill.
[3:15:01]
Well I think it's great. We're getting ahead of it,
[3:15:03]
you know, you gotta, I hate wasting time
[3:15:05]
because it costs you more money.
[3:15:06]
So I think the sooner we can get ahead of it,
[3:15:09]
the better off we're gonna be.
[3:15:11]
Great. Kathy?
[3:15:13]
Yeah, I think this makes entire sense.
[3:15:16]
I mean we need the, we need the volume to negotiate.
[3:15:20]
You know, we've, we've, it's worked for us well in the past
[3:15:23]
and so I I'm supportive of this.
[3:15:27]
Can I just ask why, why is wealth the lead?
[3:15:30]
So interestingly enough, they were the lead 20 years ago.
[3:15:32]
Whether that's a good answer or not, they have chosen
[3:15:36]
to sort of take on I guess the administrative burden
[3:15:38]
of collecting the information.
[3:15:41]
It is a little bit like herding cats trying
[3:15:43]
to get over 30 municipalities with different forms
[3:15:45]
of government in order to all commit.
[3:15:48]
And they also had worked with KP Law in the past,
[3:15:51]
as I indicated they were the firm
[3:15:52]
that represented this group 20 years ago
[3:15:54]
and have some of the institutional records
[3:15:56]
that we thought would be useful as part of negotiations.
[3:15:59]
Okay, Madam Chair then I would move
[3:16:01]
that the select board approve
[3:16:02]
and execute the interim municipal agreement between the town
[3:16:06]
of WaPo and various municipalities
[3:16:08]
regarding solid waste contract negotiations.
[3:16:11]
Subject to the additional stipulation
[3:16:13]
provided by WaPo that went total fees, cost
[3:16:16]
and expenses bill to all parties under section two
[3:16:18]
of the agreement exceed $75,000.
[3:16:21]
The wall poll representative shall notify all other parties,
[3:16:24]
representatives by email at the email addresses set forth in
[3:16:28]
this agreement, and the parties shall properly confer
[3:16:31]
through their representatives by teleconference
[3:16:33]
regarding anticipated future cost
[3:16:36]
and continuation of the agreement.
[3:16:38]
Second.
[3:16:40]
All righty then. So Kathy?
[3:16:44]
Yes, Phil? Yes. Josh? Yes. Kevin. Aye.
[3:16:49]
And I vote Yes. Thank you very much. Appreciate this.
[3:16:55]
Okay, next up
[3:17:00]
we have Miles Tucker, our support services manager to talk
[3:17:03]
to us about digital legal notices, warrant,
[3:17:06]
article proposal.
[3:17:09]
Thank you Madam Chair. Good evening.
[3:17:10]
Members of the board, I will try
[3:17:12]
and keep this brief given the hour.
[3:17:15]
So Last year goals, this board set as one
[3:17:20]
of its initiatives to study a home rule petition
[3:17:22]
to permit the town to place legal notices
[3:17:26]
on a digital format as opposed
[3:17:27]
to having them printed in a newspaper.
[3:17:30]
This is a relatively recent option
[3:17:32]
provided to communities by the Commonwealth
[3:17:33]
and has been successfully completed by other communities,
[3:17:36]
Arlington and Lincoln or some of our peers who have passed
[3:17:40]
a similar home rule petition.
[3:17:44]
This is beneficial to the town in
[3:17:46]
that there is a consistently shrinking
[3:17:49]
printed newspaper market, especially with the recent
[3:17:52]
limited distribution of the last print newspaper name,
[3:17:56]
the Hometown Weekly, which no longer
[3:17:58]
does home deliveries anymore.
[3:17:59]
They deliver to 70 sites in town,
[3:18:01]
but it's, it's further limited.
[3:18:04]
So in your packet is a draft warrant article containing the
[3:18:07]
text of the proposed home rule petition.
[3:18:09]
It is nearly identical to two peer communities, Westford
[3:18:13]
and Wellesley that have recently passed
[3:18:16]
said home rule petition.
[3:18:18]
Both of those are still with our friends at the general
[3:18:20]
court, but the way that the law was updated,
[3:18:25]
it's pretty clear what this language needs to be.
[3:18:29]
It would permit the town as well as school department
[3:18:32]
to post in five specific locations.
[3:18:36]
Those could be printed newspapers,
[3:18:39]
a printed newspapers website, a local digital news site,
[3:18:43]
a statewide legal notice repository, or a town repository.
[3:18:47]
It's worth noting that the town already has a part
[3:18:49]
of our website that has public hearings
[3:18:52]
and legal notices in one central location.
[3:18:54]
So that already exists. Does not change the actual noticing
[3:18:58]
requirement time that a legal notice would need
[3:19:01]
to be placed in advance or anything.
[3:19:03]
Those time limits are still in place.
[3:19:06]
Notably, our deputy town manager, director
[3:19:08]
of finance highlighted to us
[3:19:10]
that tax takings will still need
[3:19:12]
to be printed in the newspaper.
[3:19:13]
So this applies to most, but not all legal notices.
[3:19:18]
Tax takings are a specific thing that need
[3:19:20]
to be still printed, representing a
[3:19:25]
very, very, very, very, very small percent
[3:19:28]
of our overall legal notices.
[3:19:31]
A proposed concept for the operating of this
[3:19:34]
home rule petition, if it were to be passed
[3:19:36]
and passed by the legislature,
[3:19:37]
would be using the town's webpage
[3:19:40]
that exists right now as the default.
[3:19:42]
However, committees
[3:19:44]
or the bodies that would be using these that are required
[3:19:49]
to post these legal notices would solve the option
[3:19:51]
to post any of the five available other sorts of media
[3:19:56]
in the event that wider distribution would be
[3:19:59]
wanted by that body.
[3:20:02]
And with that, the draft article, again,
[3:20:05]
is both included in this packet as well as in the draft
[3:20:07]
of the special town meeting warrant
[3:20:09]
that you will address later in this meeting
[3:20:10]
because there's still later in this meeting.
[3:20:14]
And with that, I'm happy to answer any questions.
[3:20:16]
Miles, what's what happens for the, for the tax takings,
[3:20:21]
I mean for those that are required to be in a newspaper,
[3:20:25]
what, what happens if there's no newspaper?
[3:20:28]
That's a great question. Well, I will say as well,
[3:20:32]
it's a newspaper that is distributed here.
[3:20:36]
Past practice has been to go with the local newspapers.
[3:20:40]
There are also the Boston Globe and Boston Herald.
[3:20:42]
Those are distributed here.
[3:20:44]
Frankly speaking, the the price is significantly higher than
[3:20:49]
the local distribution papers.
[3:20:51]
So we've, we've gone to the globe in examples where to,
[3:20:56]
to the point of the time notices not being changed in the
[3:20:59]
past where, you know,
[3:21:02]
I'll admit when I was a new staff member here,
[3:21:04]
I missed a posting deadline.
[3:21:05]
I believe it was for a cable hearing.
[3:21:07]
So we had to go out to the globe
[3:21:09]
because we needed it done soon and it was able to be done.
[3:21:14]
So there, there are still papers of record
[3:21:16]
that are distributed with enough distribution in Needham.
[3:21:18]
Okay. So it it doesn't need to be a local paper?
[3:21:21]
No, it needs to have, I forget the specific term,
[3:21:25]
but it's, it's effectively why Definit
[3:21:26]
Circulation of some, yeah.
[3:21:28]
Okay. All right.
[3:21:30]
Well this is, this is really very comprehensive.
[3:21:33]
I am, I'm shocked to see the cost
[3:21:38]
spent on printing legal notices in fiscal year 2026 was 30
[3:21:42]
over $34,000.
[3:21:44]
So it seems to me like not only is this actually
[3:21:49]
generally speaking, probably more convenient for folks,
[3:21:53]
but also considerably less
[3:21:54]
expensive I would hope for the town.
[3:21:56]
Do we know what the comparable cost of digital, I mean
[3:22:01]
presumably nothing
[3:22:02]
but staff time, which is not insignificant
[3:22:05]
for the town website, but do other
[3:22:09]
local outlets charge for digital notices?
[3:22:13]
That's a great question. I don't know at this time.
[3:22:17]
For example, we have a few digital only
[3:22:20]
publications here in Needham.
[3:22:21]
The town is not permitted to notice with them, so Okay.
[3:22:25]
That there's not exactly a market. Yeah.
[3:22:28]
However, to your point and,
[3:22:30]
and to highlight back on what the director of community
[3:22:33]
communication and community engagement mentioned earlier,
[3:22:36]
we do not want people to not know what's going on.
[3:22:40]
This does not restrict the town
[3:22:42]
or the schools from posting only to our website.
[3:22:45]
The other media are still permitted
[3:22:47]
and it actually increases the scope
[3:22:50]
by which the town is permitted to communicate,
[3:22:53]
which would be beneficial, I would believe.
[3:22:56]
Great. Anyone else? No,
[3:23:00]
I think this has been official for the town.
[3:23:03]
I mean it's, I mean coming,
[3:23:05]
it's bringing the town into the times.
[3:23:08]
Most people don't subscribe to a newspaper, let alone,
[3:23:11]
you know, get a free one anymore.
[3:23:14]
I think because Amy was just here talking about,
[3:23:17]
you know, how people get their news.
[3:23:19]
I do think it's really important to have
[3:23:20]
that central repository to at least have all
[3:23:23]
of the postings on the town website.
[3:23:25]
And then certainly we can add other postings
[3:23:28]
in other locations as well.
[3:23:29]
Could I suggest like one small change, like to that effect?
[3:23:33]
So this would allow posting in any of these five could,
[3:23:37]
could we say it's satisfied by posting it
[3:23:39]
to the town website plus any of these other locations?
[3:23:43]
Because that would just ensure that it's always, always has
[3:23:47]
to be posted to the town website so
[3:23:48]
that it's in one central location.
[3:23:51]
Always.
[3:23:52]
That's a good question. I'd have to confer with council.
[3:23:54]
Yeah. And, and report back.
[3:23:57]
And I just wanna say I appreciate town
[3:23:58]
council for drafting this.
[3:23:59]
Yeah, yeah. But I think, correct me if I'm wrong,
[3:24:03]
but you did say that we are currently keeping all of
[3:24:06]
This is something we already do.
[3:24:07]
That's correct. It's current practice.
[3:24:08]
We already have all the ads, procurement, public meetings,
[3:24:13]
they're already posted on the website
[3:24:14]
in a central repository.
[3:24:16]
Okay. So it's something we're already doing.
[3:24:18]
I, I'm just thinking ahead for the future
[3:24:20]
because practices can change over time.
[3:24:26]
All right. Anyone else? Yeah,
[3:24:31]
Kevin, I used to work for a publisher
[3:24:32]
who said the legal notices for license to print money.
[3:24:37]
And I think though times have changed
[3:24:39]
and the reality of it is that websites replace newspapers
[3:24:44]
and we have to be and go where people are reading.
[3:24:47]
So we should, I'm all for this.
[3:24:49]
This is, I mean it's very sad to see the newspapers go.
[3:24:52]
Yeah. But the reality is we could
[3:24:56]
realize some savings
[3:24:57]
but also reach the people we need to reach better.
[3:25:01]
Wow,
[3:25:03]
That's good.
[3:25:04]
Great. Thank you. Kathy has her hand up.
[3:25:07]
Oh, Kathy, go ahead.
[3:25:09]
Yeah, I think that, you know, it makes sense for us
[3:25:12]
to continue the practice of, you know,
[3:25:15]
always putting something on our website as, as a way
[3:25:18]
to have a record and to have it there.
[3:25:20]
I think in terms of the way we draft the law, it,
[3:25:24]
it does make sense to model it off of
[3:25:26]
what has already worked from these other towns.
[3:25:28]
I mean we're talking about a home rule petition.
[3:25:30]
These things are a giant pain
[3:25:33]
and I would just go with what works.
[3:25:36]
Yeah, I suppose we can always add in practice a,
[3:25:41]
a secondary if we choose to do that.
[3:25:43]
But I, I wonder about requiring it as a point of law
[3:25:48]
that, you know, that seems like they could
[3:25:50]
be encumbering ourselves.
[3:25:53]
Who knows what is gonna happen in the future.
[3:25:57]
Have, have these, I think the ones these,
[3:25:59]
this is modeled after, haven't been passed. Right?
[3:26:02]
Have they, the two specific ones, Westford
[3:26:04]
and Wellesley have not, they're still in the general court,
[3:26:06]
however extraordinarily comparable
[3:26:10]
ones in Lexington and Sudbury for example.
[3:26:12]
Have.
[3:26:15]
Okay. Now if you could, if you could get
[3:26:16]
that answer from time counsel, I think that
[3:26:17]
Would be helpful.
[3:26:18]
I'd be more than happy to. Thank
[3:26:19]
You.
[3:26:20]
Thanks Miles. You're welcome.
[3:26:24]
Okay, so next up we're gonna look at
[3:26:29]
the town manager and first on that is referring,
[3:26:33]
accepting and referring the zoning.
[3:26:35]
Great. The planning board has been having their
[3:26:39]
deliberations for articles
[3:26:40]
for the October special town meeting.
[3:26:42]
And so what's before you tonight is they have asked for you
[3:26:46]
to accept and refer back to them
[3:26:48]
two articles under the umbrella of the large house review,
[3:26:51]
one on half story attic requirements
[3:26:54]
and the other on height requirements.
[3:26:57]
And this is a procedural vote that you have
[3:26:59]
to take under state law.
[3:27:03]
Okay. Any thoughts from my colleagues?
[3:27:08]
I, all right then
[3:27:11]
I would move that the board would accept all
[3:27:13]
the proposed zoning articles.
[3:27:14]
Article one, amen's zoning, bylaw half story in parent
[3:27:18]
at requirements in the single residence B District article
[3:27:22]
two, Amen's zoning bylaw height requirements in the single
[3:27:25]
residence B District for referral to the planning board
[3:27:28]
for its review, hearing and report.
[3:27:32]
Second. All right.
[3:27:36]
And we'll take a vote. Kathy?
[3:27:41]
Yes. Bill? Yes. Josh? Yes Kevin.
[3:27:45]
Aye I vote Yes. Thank you.
[3:27:51]
Next,
[3:27:53]
Next up is asking the board to call
[3:27:55]
for an open the special town meeting warrant,
[3:27:58]
which will be held on Monday October 19th, 2026.
[3:28:03]
We, you are being asked to open the warrant tonight.
[3:28:06]
Just looking ahead, you would close the warrant at your next
[3:28:09]
meeting September 8th.
[3:28:11]
So at that point we'd hopefully have
[3:28:12]
no additions after that point.
[3:28:15]
But there is, you have a meeting September 22nd,
[3:28:19]
which is your final meeting before it goes to print.
[3:28:21]
So we could still make changes, withdrawals
[3:28:24]
or changes to the article, language, et cetera.
[3:28:28]
I do wanna just walk through the draft warrant.
[3:28:31]
This is very much first draft, a lot of placeholders,
[3:28:34]
but just to give the board and the public a sense
[3:28:38]
and just I'll walk through the articles
[3:28:42]
and I would love if the board, if there's any
[3:28:44]
that you particularly would like a presentation on.
[3:28:47]
Just note that and I can start getting those scheduled
[3:28:49]
for your next couple of meetings.
[3:28:51]
And this is the moment, lemme just pause
[3:28:52]
and say it's August, it's summer, and yet here we are
[3:28:56]
and we're like headlong into town meeting.
[3:28:58]
So this is when things start like ramping up at a speed
[3:29:02]
that no one ever anticipates
[3:29:03]
until we're in the middle of it.
[3:29:05]
So walking through the draft warrant,
[3:29:09]
the first article is appropriate
[3:29:11]
for the Pollard Middle School.
[3:29:13]
And this language has been drafted by town council.
[3:29:16]
We will ensure that MSBA has had a chance to review it
[3:29:20]
and bond council as well
[3:29:22]
before we insert the language into the
[3:29:24]
warrant. Basically there will be
[3:29:27]
Lots of presentations to come this,
[3:29:29]
Yes, many presentations to come.
[3:29:34]
The next handful are placeholders should we need them.
[3:29:38]
So unpaid bills
[3:29:40]
and line item transfers if needed within
[3:29:43]
our FY 2027 operating budget.
[3:29:45]
And our two enterprise fund budgets for sewer and water.
[3:29:50]
So we're gathering if any of those will be needed.
[3:29:55]
We have our public education and government programming peg.
[3:29:58]
This is pass through funds from cable providers
[3:30:03]
to the the Needham channel.
[3:30:05]
And so we have this on every warrant to,
[3:30:10]
I have a timely expediting pass through.
[3:30:14]
It is 9 42.
[3:30:17]
The next two articles are the zoning ones
[3:30:19]
that you just took the procedural vote on.
[3:30:23]
And I guess I pause
[3:30:24]
and see if the board would like a presentation on those.
[3:30:28]
Yes, absolutely. Yes. Great.
[3:30:31]
I will work with the planning board planning director
[3:30:33]
to schedule those under
[3:30:37]
general articles.
[3:30:39]
We're on page six of the draft warrant.
[3:30:41]
There's the home rule petition related to the Article 97
[3:30:47]
for Warner Field as part of the Pollard project
[3:30:50]
that we've discussed at your last few meetings.
[3:30:53]
So this is the continuation of the local approvals
[3:30:56]
that we would be required to comply with.
[3:30:58]
Article 97.
[3:31:00]
Madam Chair, the last time we had an Article 97
[3:31:04]
article in the warrant, it appeared right
[3:31:07]
after the, the article that we were voting on.
[3:31:10]
Oh, maybe that might help with the flow if we made
[3:31:14]
that article two right after Pollard.
[3:31:17]
Let me confer with town counsel on that. Yep.
[3:31:26]
Okay. You had a presentation at your last meeting
[3:31:30]
regarding the proposed single parcel historic district
[3:31:33]
for the White House on South Street.
[3:31:34]
So there's a placeholder there.
[3:31:38]
One question for the board, the
[3:31:43]
proposal for a general bylaw amendment
[3:31:46]
around tree protection and preservation.
[3:31:48]
I wanted to gauge deferral to May versus
[3:31:53]
advancing to the October special time meeting.
[3:31:59]
As much as I would like to see this go to October, I,
[3:32:02]
I'm a little concerned about the timeline given
[3:32:05]
the number of big events.
[3:32:07]
I mean not only Pollard, I'm I, all of the stuff that goes
[3:32:09]
with that, but also the election.
[3:32:14]
We still haven't had,
[3:32:15]
we haven't had a public hearing on the part
[3:32:17]
of the select board for this bylaw.
[3:32:21]
And so it just seems like a lot to squeeze in.
[3:32:23]
But if, I mean, if it's feasible, sure
[3:32:28]
that would, that would mean I would like to see that.
[3:32:31]
But if it's, but I think we have to evaluate whether
[3:32:34]
or not it's really feasible in light of all of the,
[3:32:39]
the big fixed items on the,
[3:32:45]
on the docket for the fall.
[3:32:49]
I would lean towards maybe
[3:32:50]
'cause I just don't see how it can be feasible
[3:32:52]
to get everything done that we need to get done.
[3:32:54]
Yeah, I I mean I'm worried
[3:32:56]
About it.
[3:32:57]
I'm not, I'm the same. Not
[3:32:57]
that I don't want it to be done, but
[3:32:58]
As we, as we game out like all of the time that is needed
[3:33:02]
for each one of these things, issues, you know,
[3:33:05]
I I just worry that this one's
[3:33:06]
gonna get knocked off the plate.
[3:33:08]
So as we game it out, I, I mean I'd like
[3:33:11]
to keep the possibility open I guess,
[3:33:13]
until our next meeting.
[3:33:16]
But I, I acknowledge that, I think
[3:33:19]
that the timeline is really tight.
[3:33:24]
I'm just thinking of scheduling wise,
[3:33:28]
your next meeting, September 8th is
[3:33:30]
immediately after Labor Day.
[3:33:31]
So if you wanted to hold the public hearing, I'd recommend
[3:33:34]
to do that your September 22nd meeting, you would have,
[3:33:43]
if you had the hearing that night,
[3:33:45]
that would be your last chance to take it off the
[3:33:48]
warrant right then.
[3:33:49]
So it's tight I guess.
[3:33:51]
And I think it just, you'd have more time
[3:33:54]
to process feedback if you received any, if you defer to me.
[3:33:59]
Sure. Okay.
[3:34:03]
I don't, we don't have
[3:34:04]
to make this decision at this moment though.
[3:34:06]
I, I can keep the placeholder on Yeah.
[3:34:08]
Until your next meeting. Let's
[3:34:09]
Do that.
[3:34:10]
Okay. And maybe we can, you know,
[3:34:15]
we're gonna have our goals meeting next week so we'll see
[3:34:18]
how many things are on our plate for the fall
[3:34:21]
and once we understand that kind of,
[3:34:24]
we can game it out, see if there's enough time.
[3:34:28]
But that seems pretty tight. I'd hate to
[3:34:32]
To the hearing.
[3:34:33]
It feels like you're better fit, but if you want hear it.
[3:34:36]
Yeah.
[3:34:40]
The next article on the top page seven is the Home Rule
[3:34:44]
that Miles just presented to the board
[3:34:46]
and it sounds like support to move forward with that.
[3:34:49]
So we'll keep that on.
[3:34:51]
Deputy time manager director finance is working on potential
[3:34:55]
recommendations for real estate tax exemptions.
[3:34:58]
So adjustments to our existing programs
[3:35:01]
to expand eligibility.
[3:35:04]
Next steps on that would be he'll, he will be presenting
[3:35:08]
to the board of assessors
[3:35:09]
and getting their feedback on that.
[3:35:11]
So my plan for the select board is to wait
[3:35:14]
for those conversations so then it can be presented
[3:35:16]
to you in full with that feedback.
[3:35:19]
There's also an abatement related to affordable housing.
[3:35:24]
So like if residents rent a unit
[3:35:29]
to someone who is, you know, below a certain income level
[3:35:33]
that a homeowner is eligible for residential abatement,
[3:35:36]
I maybe we can discuss it during the, the board hearing.
[3:35:40]
I I, if we wanted to opt in, it would have
[3:35:42]
to be on town meeting timing would have to approve it.
[3:35:46]
Okay. I'll ask do you To follow up. Okay.
[3:35:52]
Okay. And there are two
[3:35:57]
articles related to changes to revolving funds.
[3:35:59]
I think we discussed briefly at your last meeting.
[3:36:02]
One to just move the park
[3:36:04]
and rec revolving fund to a more modern, modern structure
[3:36:08]
and to replace our current revolving fund
[3:36:12]
for traveling meals to replace it
[3:36:15]
with a community nutrition revolving fund
[3:36:17]
that would just allow it for a broader set of purposes
[3:36:20]
around food, food insecurity and community nutrition
[3:36:24]
For the park and record revolving fund, does
[3:36:26]
that eliminate the existing revolving fund?
[3:36:31]
Yes, that's the intent. That's yes.
[3:36:33]
And the fund For the, for the community nutrition,
[3:36:39]
are we doing this in anticipation of Beth Israel not
[3:36:44]
participating in that program or is this
[3:36:45]
an expansion of the program?
[3:36:48]
So it is not driven by our current arrangement
[3:36:52]
with BID Needham.
[3:36:54]
The Public Health Division
[3:36:56]
and Aging Services has broadly been working on thinking
[3:37:00]
about expanded community nutrition programs.
[3:37:03]
A part of that would be if we ever needed
[3:37:05]
to take on the services that BID Needham provides for us,
[3:37:08]
how could we or would we,
[3:37:10]
but it's, the motivation
[3:37:12]
for this is I think more, more broad.
[3:37:14]
We'll have the updated kitchen at the center at the heights
[3:37:17]
after construction's completed this year
[3:37:21]
and we'll be able to do a lot more offerings in-house.
[3:37:25]
So this revolving fund is a way to
[3:37:29]
use the existing revolving fund mechanism more broadly.
[3:37:32]
I think it'd be great to have a presentation on this
[3:37:34]
and learn more about the program.
[3:37:36]
Yep. Great.
[3:37:37]
I'm actually on the board of the traveling meals
[3:37:39]
and we get a lot of requests
[3:37:40]
besides just getting the meals delivered
[3:37:43]
for things like can, can we bring someone to Cath
[3:37:46]
and provide them with breakfast to do things like that.
[3:37:48]
So I think it is basically the expansion of,
[3:37:51]
of, of the program.
[3:37:52]
So when we get requests, you know,
[3:37:55]
we will be able to do more things.
[3:38:00]
Great. And the last two
[3:38:05]
placeholders are takings related to
[3:38:10]
infrastructure projects that you've heard from DPW about.
[3:38:15]
The first is we have an intersection improvement
[3:38:18]
project at Great Plain and Central.
[3:38:20]
A voluntary taking would be
[3:38:22]
required at the Presbyterian church.
[3:38:25]
DPW is in touch with the church
[3:38:27]
and they have expressed their willingness to donate the land
[3:38:31]
for the improvements that are needed.
[3:38:33]
But this would require town meeting action.
[3:38:35]
And from the presentation you just heard that
[3:38:40]
an easement needed at Dedham Ave and South Street
[3:38:46]
Can we, is the design for great plan
[3:38:49]
and central at a stage where it's ready for a presentation?
[3:38:52]
Yeah, I can follow up with DPW director on that. Okay.
[3:39:02]
And I do wanna note that I had mentioned this at your
[3:39:05]
previous meeting, but one of the articles
[3:39:07]
that you do not see on here is design funds requested
[3:39:10]
for Great Plain Avenue improvements that you voted earlier.
[3:39:15]
My recommendation is to have that be for the May 27th
[3:39:20]
town meeting, given the level of engagement, interest number
[3:39:25]
of stakeholders in that project.
[3:39:26]
If we defer the article to May,
[3:39:29]
that would allow our staff team to be able
[3:39:32]
to map out the full design process, bring the process
[3:39:35]
to the board to make sure that we are in agreement,
[3:39:38]
have the same expectations about how
[3:39:40]
that design process would run, what community engagement
[3:39:43]
or stakeholder engagement would look like, what staff
[3:39:46]
and our technical expertise
[3:39:47]
and consultants would be working on.
[3:39:50]
And then we'd be able to have that presented
[3:39:53]
to the board in advance of Maytown meeting
[3:39:55]
when the design funds are requested, we'd be able
[3:39:58]
to answer a lot of questions that I anticipate we,
[3:40:00]
we would get from town meeting members.
[3:40:03]
Yep. Sounds reasonable.
[3:40:09]
Madam Chair, I move the board vote to call for
[3:40:11]
and open the warrant
[3:40:13]
for the October 19th, 2026 special town meeting.
[3:40:16]
Second.
[3:40:18]
Okay. Kathy? Yes. Bill?
[3:40:23]
Yes. Josh? Yes. Kevin. Aye. Can I vote? Yes.
[3:40:29]
Great. Next
[3:40:35]
The Commissioner of trust funds will have a vacancy
[3:40:38]
at the end of August and I will be brief
[3:40:41]
and I think maybe turn it over to the vice chair just
[3:40:44]
to know procedurally the town clerk
[3:40:48]
provided the select board
[3:40:49]
with a letter outlining the available options
[3:40:52]
to the board relative to filling that position by a joint
[3:40:57]
appointment process with the commissioner of trust funds
[3:40:59]
or via special election.
[3:41:01]
The commission did send a letter
[3:41:03]
to the board expressing their interest in participating in a
[3:41:05]
joint appointment process.
[3:41:07]
And I will turn it over
[3:41:09]
'cause I think those conversations are underway.
[3:41:11]
Thank you. So I, we, the chair
[3:41:15]
of the Commissioner of Trust Hunts
[3:41:17]
and I have a meeting scheduled tomorrow night
[3:41:20]
in anticipation that the board wants
[3:41:22]
to move ahead with appointing.
[3:41:24]
If not, we can cancel that meeting.
[3:41:26]
But the, the chair has indicated that she wishes to fill it
[3:41:31]
as quickly as possible.
[3:41:33]
I think we could probably accommodate that.
[3:41:35]
I would propose a, a similar process as the Park
[3:41:40]
and Rec commission where we notice it
[3:41:42]
for two consecutive weeks
[3:41:44]
and then I think that would allow us time to
[3:41:49]
hold an appointment with a, with a joint appointment
[3:41:53]
with both boards during our regular September 22nd
[3:41:56]
meeting if that works.
[3:41:59]
Sounds fine. Okay.
[3:42:03]
Okay, great. Okay,
[3:42:09]
Lastly town manager report.
[3:42:11]
I just wanna know, we have had two notable retirements
[3:42:15]
of DPW foreman this summer.
[3:42:17]
So I just wanna share a little bit about them particularly
[3:42:19]
because they may be a little bit more
[3:42:21]
behind the scenes for some folks.
[3:42:23]
They're well known in our eyes.
[3:42:25]
But Doug Manje retired on June 30th.
[3:42:29]
He's a well recognized member
[3:42:31]
of our parks and forestry division.
[3:42:33]
He was instrumental in kind of all of the operations of
[3:42:36]
that division and ensuring
[3:42:37]
that our fields were are safe and beautiful.
[3:42:40]
And I'd say particularly in, in talking with the team,
[3:42:44]
our most visible events where people really get to access
[3:42:47]
and work be in our
[3:42:51]
park spaces July 3rd and fourth events
[3:42:54]
and the Memorial Day tournament being those two big ones,
[3:42:58]
he was instrumental and had a lot of knowledge.
[3:43:02]
And I will also note he was our irrigation expert
[3:43:06]
and kept the town systems going over the years.
[3:43:09]
So I think, you know, we're, we have a lot of systems
[3:43:11]
that are different and hand run
[3:43:13]
and require the expertise of someone like Doug.
[3:43:18]
Jerry Sharp retired on August 7th
[3:43:20]
and he is the lead
[3:43:22]
of the water sewer drains construction crew.
[3:43:25]
They are responsible for responding in all emergencies to
[3:43:30]
the distribution systems that we have.
[3:43:32]
And this is core life health safety work.
[3:43:35]
They Jerry also, in addition to responding to emergencies
[3:43:40]
because we have the talent in house, he was able
[3:43:42]
with his crew to do a lot of proactive projects
[3:43:45]
that are small, smaller in nature.
[3:43:47]
So a smaller dia, dia diameter main replacement
[3:43:51]
and other utility projects that we didn't have to go
[3:43:55]
contract out because we had the
[3:43:56]
expertise and the talent in-house.
[3:43:58]
So over the years Jerry has trained dozens
[3:44:01]
of staff members on how to manage our distribution systems
[3:44:05]
and respond to emergencies.
[3:44:06]
And this is to the benefit
[3:44:07]
of every single person in Needham
[3:44:10]
businesses residents alike.
[3:44:11]
So they both will be missed
[3:44:13]
and we thank them very much for their service. So
[3:44:16]
Do we send them a appreciation letter
[3:44:18]
like we do for committee members?
[3:44:20]
I don't know why we wouldn't for them.
[3:44:22]
You know, we haven't had a formal
[3:44:24]
System.
[3:44:25]
We talked, we talk about that a lot
[3:44:26]
with I think that's a great idea.
[3:44:27]
Can we formalize? Yeah. Yeah.
[3:44:30]
I mean I know both of them
[3:44:31]
and they both were unbelievable.
[3:44:32]
Yeah. You know, so I think they would
[3:44:35]
appreciate something like that too.
[3:44:36]
Yep. I mean personally,
[3:44:38]
but I think it would be better coming from,
[3:44:41]
Yeah. Excellent.
[3:44:43]
Congratulations. Both. That's it.
[3:44:48]
Okay. So thank you.
[3:44:52]
And the next thing is committee reports expect this to be
[3:44:57]
reasonably quick 'cause it's a summer.
[3:44:59]
We'll start with Kathy. No reports.
[3:45:05]
Excellent. Thank you Bill.
[3:45:07]
I was lucky enough to go to the Needham night out
[3:45:09]
that the Needham Police sponsored last week.
[3:45:11]
And it, it was a great event.
[3:45:13]
It was great to see so many families there,
[3:45:14]
but one of the best things was see how many
[3:45:16]
families had repeated.
[3:45:19]
They came here after year
[3:45:20]
and there was a picture on social media
[3:45:22]
of Eddie Tis on his police, the motorcycle.
[3:45:25]
And they had brought a picture of when they came nine years
[3:45:27]
ago with their child and they came back with that child
[3:45:30]
and put 'em on the motorcycle.
[3:45:31]
We took it. So it was great to we to see them back there.
[3:45:34]
And then Kevin and I attended the Purple Heart
[3:45:38]
event the last Friday evening.
[3:45:40]
Kevin did a great job
[3:45:41]
and I wish we could get more publicity about it,
[3:45:43]
get more people there, but we'll that's for another day.
[3:45:47]
Good. Great. Thank you. Josh.
[3:45:50]
We talked about Commissioner of Trust funds.
[3:45:51]
Just wanted to give an update on Park and Rec.
[3:45:54]
The interviews will be conducted
[3:45:55]
during their regular meeting on August 24th.
[3:46:00]
I don't believe that that at 7:00 PM I don't believe
[3:46:02]
the location has been announced.
[3:46:05]
Park Rosemary Recreational complex multi-purpose room.
[3:46:08]
Thank you. Rosemary Recreational. Okay, perfect.
[3:46:11]
So ever welcome to,
[3:46:13]
to watch including members of Psych board.
[3:46:14]
Yeah. And can you remind us how many candidates?
[3:46:17]
I believe eight. That's great. Great. Kevin?
[3:46:21]
Same. I went to the National Night out on the
[3:46:24]
fourth and it was, it was great.
[3:46:26]
It was, it was good to see me police
[3:46:29]
and do you know, community policing and outreach
[3:46:32]
and then the purple head ceremony too. It
[3:46:34]
Was great.
[3:46:35]
It was actually very nice.
[3:46:37]
Excellent. And I'll just say one thing today was the,
[3:46:41]
the Red Cross blood drive hosted by the town,
[3:46:45]
which is usually held cath caths under construction.
[3:46:47]
So it was up in beautiful powers hall
[3:46:50]
and really just a spectacular room to do anything in,
[3:46:53]
including give blood.
[3:46:55]
And so if you too wanna give blood, you can do
[3:46:58]
so on November 12th, which is their next, their next
[3:47:03]
date in Power Hall for that blood drive. All right.
[3:47:07]
Move we adjourn. Second.
[3:47:10]
Excellent. Kathy? Yes. Bill? Yes.
[3:47:16]
Josh? Yes. Kevin, don't start.
[3:47:18]
Yes. And the chair votes. Yes. Thank you.
[3:47:21]
And goodnight.