Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[1:10]
All
[1:23]
right. Good afternoon everyone. We will
call our meeting to order
[1:28]
and a reminder to council to disclose
any pecuniary interest or general nature
[1:32]
thereof.
And you can do that now or any time
[1:37]
during the agenda.
[1:41]
Approval of the agenda. Todd and Smokey.
Any questions, comments on the agenda?
[1:48]
Call a vote. All in favor?
Close. Motion is carried. [snorts]
[1:54]
Minutes of July 13th.
[1:58]
Rob and a woman.
[2:04]
Anything on the minutes?
[2:08]
Call the vote. All in favor?
Opposed? The motion is carried.
[2:14]
Move right into delegations.
Joe wrote forest safety and driveway
[2:22]
concerns.
Joe,
[2:27]
is he online or
>> no?
[2:34]
Okay, we [clears throat] will
go to item B.
[2:41]
Chris Wilson, WSP, master plans for
Topamorei and Lion's Head. And Chris is
[2:47]
here. Welcome, Chris.
[3:31]
the presentation and I'll just mention
to change slides when uh we're done. So
[3:36]
yes, uh I'm Chris from WSP.
Um we are the engineering consultant
[3:43]
involved with the master plans for to
marine mines head working with the
[3:46]
Ontario clean water agency and the
municipality of northern Bruce
[3:49]
Peninsula.
[3:53]
So uh go to the first overall slide. So
this is just a general overview of the
[3:58]
project to date and and kind of the the
history of uh starting point. So we
[4:04]
started this project back in 2022.
um there was some gaps in between just
[4:11]
with um
some first nation consultation and some
[4:15]
other aspects. So project has obviously
extended into a few years later than me
[4:20]
but uh we're at the we're at the end
right now. So um so yes we've developed
[4:25]
master plans for water and wastewater
for both communities of lines head
[4:29]
looking into 2046 and beyond.
important components of it are climate
[4:35]
change review social and economic
impacts as well as current limitations
[4:39]
to growth in the two communities. So the
master plan approach that we utilized
[4:43]
was approach number one and again a lot
of this all this information is
[4:47]
documented in the master plans. Um so
this was it's a very broad master
[4:51]
planning approach. Um the projects are
identified but we don't go into the
[4:57]
schedule B schedule C details of the
individual projects. they would have to
[5:02]
be completed under future EAS.
Next page, please.
[5:11]
So again, this is just giving a kind of
a overview of the morning water and
[5:16]
wastewater alternatives. They're very
similar for both. They're both um
[5:21]
alternative one for water and wastewater
is maintain existing level of service.
[5:25]
So that would be the smaller water
system in Tobini
[5:29]
and the um the larger wastewater system
obviously in town with existing other
[5:35]
existing homes on septics or on well
supplies.
[5:40]
Two was expanding water servicing within
the downtown core and general community
[5:44]
area around for both water and waste
water and through the master plan
[5:48]
process those were developed to be the
third solutions. very uh very similar
[5:54]
layouts for both. Um we'll have some
mapping later on in the presentation
[5:58]
which can which can showcase the areas.
Turn three, we don't have mapping in
[6:03]
here on that but that was generally
caring for the downtown core and
[6:08]
community area but expanding further out
into into the perimeter. So much more
[6:13]
area, much more homes included um
greater cost etc to to service those uh
[6:18]
locations.
Next page please.
[6:26]
So water alternatives obviously we have
a established water system in Lion's
[6:30]
Head. So alternative one was maintain
the existing level of service.
[6:34]
Alternative two was expand to service
new growth or existing uh inel lots
[6:39]
within the community and provide
sufficient um fireflow capacity.
[6:45]
That that would became that came out to
be the um referred solution through the
[6:49]
master plan process.
Alternative three again expands on
[6:53]
alternative two. So it includes the same
area but also expanding to Ferndale
[6:58]
with Fireflow. And then alternative four
is removing Ferndale
[7:04]
still expanding in Lions Head but also
going to ismas Bay and Barrow Bay with
[7:08]
Fireflow as well.
The wastewater alternatives, we
[7:13]
basically have two alternatives.
Maintain a existing level of service
[7:16]
which is septic systems or alternative
two is completion of a wastewater
[7:21]
treatment plant, wastewater servicing
within the downtown lines head.
[7:27]
So alternative two through the process,
you know, [clears throat] is a preferred
[7:30]
solution. It is one of the larger
solutions because there is an
[7:33]
established wastewater um system in
Lancet currently.
[7:39]
Next page please.
So this page is giving a kind of a
[7:44]
project status to date. So we've
completed a climate change memo for both
[7:48]
communities.
A design basis report for both
[7:51]
communities evaluation matrices have
been completed basically look at the
[7:56]
criteria and um categories and how we
process the to come to the recommended
[8:02]
solutions
for alternative I should say.
[8:06]
uh additions um letters have been
provided to those communities for the
[8:11]
notice commencement the PIC and
responses received similar for
[8:15]
stakeholders agencies government
agencies etc and the public
[8:20]
um the notice of commencement was um
provided on the municipal website and
[8:26]
the PIC's as well and responses have
been received
[8:30]
public information center for each
community was um completed last year in
[8:35]
the summertime in both communities
Signin sheets were received, comments
[8:39]
were received um at the at the PIC's and
also through emails and they've been
[8:45]
documented in the a general format
within the appendices within the master
[8:48]
plans.
So specific emails etc are not uh
[8:52]
necessarily provided but the comments
are are generalized to um carry forward
[8:56]
the concerns and comments from the
public.
[8:59]
» [snorts]
>> Number eight, draft master plan's gone
[9:01]
through various revisions in the last um
last year and uh we submitted the final
[9:06]
draft um late last week. So those are
available um for further comment by the
[9:11]
municipality and Ontario Clean Water
Agency um after this meeting.
[9:18]
Next page, please.
This one's hard to see, but it just
[9:22]
gives a general process for the
municipal environmental
[9:25]
assessment/master
plans. So basically we're in phase
[9:29]
number two at the selection of the
preferred solutions.
[9:33]
So then a notice of master plan would be
completed instead of a mass a notice of
[9:38]
completion because it's not a EA per se
from a schedule B or C perspective. So
[9:43]
then once that's complete then the
master plan would be finalized and put
[9:49]
out for the review period for the public
agencies etc. So all the agencies that
[9:54]
were involved would be contacted
provided access to the reports for
[9:58]
comment period and same with the public
they would be posted on the municipal
[10:02]
website for review and comment as well
[10:11]
please
[10:16]
to the preferred water and wastewater
solutions for total rain lines head
[10:20]
we've looked at current and future
growth considered up to the year 201
[10:25]
and again of the infrastructure
solutions that are discussed. A phased
[10:29]
approach is obviously a very appropriate
way to
[10:34]
provide these expansions etc to reduce
current impacts to reduce impacts to
[10:38]
current water and wastewater services
properties with existing wells and
[10:42]
septics and the overall community in
general.
[10:46]
Page please.
to move into the first solutions. So,
[10:51]
we're showing you a map of Tomori that
we've considered for this option DS
[10:57]
DWS2.
That's expand water servicing to the
[11:01]
downtown CR community area.
Um the map shows somewhat existing
[11:07]
development and future development
within the area with the red lines
[11:10]
showing future and these were carried
forward from
[11:13]
» [clears throat]
>> um discussions with municipality uh and
[11:16]
developers to include in the in in the
area. So this option would include a new
[11:21]
centralized water treating plant with
adequate water storage for fireflow
[11:26]
capacity.
Next page please.
[11:32]
So again this this one um now we're
looking at potential options within this
[11:39]
and again these options are not finite.
They could be expanded under the future
[11:43]
EAS but we've generally provided two
options for each um [clears throat]
[11:48]
water and wastewater alternatives for
both communities. So, first we're
[11:52]
starting with token water option one,
which we've looked at retrofitting the
[11:56]
existing little tub water treating plant
to basically a low lift pumping station
[12:00]
and a [clears throat] new centralized
water treating plant at a location
[12:04]
within the community. So, basically the
the existing water treatment plant would
[12:09]
be converted to a pumping station which
would then send water to a larger area
[12:14]
for a waste water for a water treating
plant.
[12:17]
So, we've we've showcased on the map um
two locations that we had looked at
[12:23]
during the um application process. We
went for funding a few years ago and
[12:28]
they included a location at Brock and
Legion. So, currently right now, those
[12:32]
are the two locations that we've
considered. There's obviously potential
[12:36]
for other locations that would be
investigated during the EAS.
[12:40]
um whether you know property has to be
purchased or other locations that have
[12:45]
um higher elevations for support of a
water tower etc. So under this option
[12:51]
there could be potentially requirement
to extend deepen or lengthen the the
[12:57]
water intake
depending on the capacity required.
[13:02]
The water treatment water treatment land
would we be looking at providing proper
[13:05]
fire flow. There would be approximately
7 kilometers of new distribution water
[13:10]
main more fire hydrants within that
water main and obviously the
[13:14]
disconnection of homes and put on water
service from their from their personal
[13:18]
wells.
The new water tower would be
[13:21]
approximately 2.5,000 cubic meters. And
then obviously there would be
[13:26]
decommissioning of existing wells
involved which would that's not to
[13:30]
happen until the system is in place and
the phasing that's completed. So you
[13:35]
know you want to have a working system
before you disconnect the people and
[13:39]
their wells.
Option two is very very similar to
[13:44]
option one. However, it would be basic
decommissioning of the little water
[13:50]
treatment plant and the construction of
a little pumping station and new intake
[13:56]
at a another location. Now, obviously,
we don't know that location, but it
[14:00]
would obviously have to be down down by
the um harbor or in the in the area
[14:05]
around it, but um I know we are limited
by the existing bream plant location
[14:10]
with sizing and space. So this is it's a
very similar option to option one. It's
[14:17]
just a new location for a low lift
pumping station.
[14:20]
So similar
um locations for the water the water
[14:24]
treatment plant could be at those two
locations we discussed on Legion and
[14:28]
B. But then there's potential for other
areas as well.
[14:35]
Next slide please.
[14:39]
We looked at high level project costing
and phasing and opinion of costing for
[14:43]
the current year.
So part A would be facilities under
[14:47]
option one would be
water treating plant work at the low
[14:51]
life station to convert it to sorry work
at the existing water treat plant to
[14:55]
become a low life station the water
tower etc. Um so and we've given an
[15:00]
indication of approximately the timing
would be to develop that by 2031 it
[15:05]
would be a schedule CA and as
[clears throat] a probable cost of
[15:09]
approximately 41 million.
Part B the water man would obviously um
[15:15]
be constructed at a later time frame. We
have included
[15:22]
uh as realistic costing as we can at
this point for rock. It can be a very
[15:27]
large cost for installing new water man.
There are abilities to create the
[15:33]
trenches smaller and um group like
infrastructure as well but you don't
[15:38]
want to have water mane and sewer too
close together. So there are some um
[15:43]
separation requirements that the
ministry of environment usually
[15:46]
requires. So typically the water main um
is covered under your your water um
[15:53]
permits and things. So it generally is
exempt from EAS but that would have to
[15:56]
be investigated further just to make
sure that schedule is correct.
[16:01]
And the intakes part C would be intakes.
So that would be tied to the facilities
[16:07]
and that would require a schedule C EA
as well
[16:12]
for the water pump water option number
two. very similar costs for the
[16:16]
facilities. Obviously with the water
main would be a similar area. The
[16:21]
intakes would be more expensive because
we're looking at a uh a development of a
[16:25]
new station on another property and then
a new intake would be required and to
[16:31]
receive um water.
[16:43]
Next, very similar mapping to the water
showcase showcasing the same developed
[16:50]
areas and and non-developed areas. And
then obviously we're we're expanding out
[16:54]
to show the existing waste water
treatment land location in Forest Main
[16:57]
further to the further to the south. So
this one would include new waste water
[17:03]
treating plant or upgrades to the
existing weight water treating plant,
[17:07]
potential new sanitary pumping stations
and force mains and upgrades to the
[17:10]
existing pumping station of force main.
[17:15]
Next page please.
[17:20]
Option one, very similar area to
the water expansion of the existing
[17:26]
waste water treatment plant with
increased capacity, new and or updated
[17:30]
sewage pumping stations and force mains.
So again, we show the existing pump
[17:33]
station on there showing a potential new
pump station. It is not in any specific
[17:39]
area. It's just showcased on the
diagram. Um [clears throat]
[17:43]
the location of that would depend on the
best place for connecting in gravity
[17:48]
sewers and the need. So that would be
investigated under a future EA.
[17:53]
Obviously the water the wastewater
system is larger than the current water
[17:56]
system. So the the amount of new gravity
sewers is less about approximately 40 km
[18:00]
or 4 km with new um sorry I shouldn't
say fire. It should just say new
[18:05]
manholes. Apologize for that. New
sanitary service connections and then
[18:10]
decommissioning of existing septic
systems.
[18:14]
Next page please.
[18:19]
Option two is is very similar to option
one
[18:22]
though it would be decommissioning of
the existing water treatment plant and
[18:26]
construction of a new waish butter
treating plant with increased capacity.
[18:31]
So logically it would be best to
probably have it in the vicinity of the
[18:35]
existing system with land availability
but it could but in the EA then in the
[18:41]
future EA it could come out that it it
um could be in another location and
[18:45]
subsequent pump stations required as
well.
[18:49]
So again same similar approximate news
gravity sewers same m numbering dan
[18:54]
holes similar sanitary service collect
connections and decommissioning of
[18:58]
existing septic systems.
Next page please.
[19:05]
So this option facilities for upgrading
the existing wastewater treatment plant.
[19:10]
similar timelines. You know, you start
to work on the um the treatment system
[19:16]
first, which will require a schedule C
EA for the waste water treatment plant
[19:20]
and a schedule B EA for the pumping
stations.
[19:25]
Gravity sewer,
similar area to the water, but with less
[19:29]
costs because there's there's less
gravity sewer to put in to connect um
[19:33]
the existing homes.
And then the force main will be
[19:37]
basically looking at new force mains
involved with the pumping stations or
[19:42]
expansion and increase in size of the
existing force main to the existing
[19:46]
wastewater treatment plant. So with the
development of pump stations and that
[19:50]
you and forest man you'd have to have a
schedule BA as well.
[19:55]
Wire option two again is very similar to
option one except it's a new facility.
[19:59]
So the facility cost has increased
to approximately 35 million.
[20:04]
The gravity super reinforce main would
be approximately the same assuming that
[20:08]
it's very much in the sim same vicinity
of the existing wastewater treatment
[20:12]
plant.
[20:17]
Next page please.
[20:21]
I'll go to Lion's Head. So the preferred
solution there was to expand water to
[20:25]
service new growth in Lions Head and
provide fire flow. And this would
[20:29]
include upgrades to the existing water
sheeting plant and adequate
[20:32]
[clears throat] storage to provide for
fire flow capacity.
[20:36]
So again, this drawing is just kind of
showing the existing water main layout,
[20:41]
some um plan development areas
as well as some of the um
[20:47]
land types.
Next page, please.
[20:54]
So lines head water option one
on the mapping you can see that we've
[21:00]
expanded it to more street and included
that within the boundary. I know it's
[21:05]
not uh necessarily within what has
typically been considered lines but uh
[21:10]
we were we were asked to include that
area and then do an analysis there. So
[21:14]
we've included the homes up that stretch
up the up the hill there.
[21:18]
So with this system again as discussed
we would be upgrading the current water
[21:21]
treatment plant and low lift pumping
with increased capacity including air
[21:24]
flow. Uh in [clears throat] this option
we've considered that the intake would
[21:28]
likely be appropriate at the size it is.
So we haven't included costing for
[21:33]
increasing the size of the intake
location etc.
[21:37]
As the system in line is is established
already, there would be quite a bit less
[21:42]
um new distribution water main required
approximately 2 km with similar um
[21:47]
appropriate appropriate hydro fire
hydrant locations, new water services
[21:52]
and um a larger
um as you can see there the water
[21:56]
storage is is higher than to based on
fire flow requirements for building
[22:01]
types. So depending on the building
types in the communities, it raises the
[22:05]
the fireflow requirements. So, and the
volume required to to fight fires.
[22:11]
So, in this option, we'd be looking at
potential water tower or water in ground
[22:15]
water at the existing water treatment
plant location on the same property.
[22:22]
Next page, please.
[22:26]
Option two, it's very similar to option
one in in regards to upgrading the the
[22:30]
water treat plant, but the new storage
would be on a separate property. So in
[22:35]
the diagram we've just indicated an area
of town that is at a higher elevation.
[22:41]
It's not a it's not a you know
necessarily a location that would be the
[22:46]
final location. It's just to give
representation of a having a a water
[22:50]
tower on a separate lot.
So some advantages to having a water
[22:57]
turn on a separate area is um you know
it can increase hydraulic performance,
[23:00]
reduce redundant pumping requirements.
Um [groaning]
[23:04]
[snorts]
though it could be a little bit more
[23:07]
expensive just because of land
acquisition etc. But as always your your
[23:11]
best option is just to try and find
property where you can get the the best
[23:15]
elevation to um the pressures you need
etc.
[23:23]
Please
[23:27]
we've given some of costing and years
required very similar to toi. So
[23:33]
obviously the the facilities costing
would be less since we have established
[23:37]
system. The water main requirements
would be less than totem and the
[23:42]
upgrades for low pumping and intakes
would be would be less cost as well. So
[23:48]
very similar class E requirements and
scheduling.
[23:54]
Option two, very similar. Again,
the facilities cost is a is a little bit
[23:59]
higher just because of the um the water
tower
[24:11]
dedicated pumping to the water tower off
site. So meaning it is not pumping
[24:15]
through the distribution system to fill
the tower. it has a dedicated line to
[24:19]
the tower. So, we've just allowed a bit
extra cough in there in case that is a a
[24:23]
route that the EA's uh recommended
future.
[24:30]
Very similar for part C for intakes,
assuming that we would not be actually
[24:37]
increasing the size or location intake,
just modifications to the existing
[24:42]
facility.
[24:47]
Next one preferred solution lion head
wastewater.
[24:50]
So the proposed solution came to look at
providing a wastewater dedicated
[24:54]
wastewater facility and servicing a
lion's head
[24:58]
including pump stations and forcements.
Next slide please.
[25:06]
So this option one's a new waste water
treatment plant collection system
[25:10]
pumping system etc for the community.
The location of the pump station and
[25:15]
waste water treatment plant. we've
contained within the the boundary of the
[25:19]
community. However, again, these are
just reference locations to provide
[25:23]
substantiation to produce costing
estimates and they're, you know, the
[25:28]
best locations, etc. And studies will
come out in future EAS. [gasps]
[25:35]
So approximately 8 km of new gravity
sewer to service the community and the
[25:41]
surface zone that we've indicated
new and sanitary service connections and
[25:45]
decommissioning the existing septic
systems.
[25:52]
Next page piece.
[25:56]
So mindset option two is very similar to
one except we've showcased a potential
[26:01]
wastewater treatment plant outside the
community with a larger force man
[26:06]
and this option is more aligned with
demand growth meaning that you would
[26:13]
start
smaller with the pump station with the
[26:17]
wastewater treatment plant and build up
more as time goes on instead of spending
[26:22]
more money up front for a larger system.
Um [clears throat]
[26:27]
have some more notes here. Just a
second. So yeah, it it involves more of
[26:31]
a phased approach. Even though they're
all a phased approach, this is a very
[26:34]
this is a much more um substantiated
phased approach. Um less land may be
[26:40]
required at the beginning just to
service in the phasing.
[26:45]
Additional phases would be you would
upgrade the plant basically as you add
[26:49]
more onto the the community up to up to
the final 20 year. Um, one thing as well
[26:56]
is it it considers more of a a lagoon
type system very similar to to where
[27:01]
option one closer to the community,
closer to the lake hiron. Um, we've
[27:07]
allowed for more cost in there for a
mechanical plant. Um,
[27:10]
[snorts and clears throat]
just due to the proximity etc. So
[27:14]
there's, as you'll see in the next page,
the costing is higher for the facilities
[27:18]
for option one.
Next page, please.
[27:27]
So again, there's a there's a very large
facilities cost to develop under option
[27:31]
one with EAS involved, etc. The gravity
sewer is obviously higher than than
[27:36]
[clears throat] the water main because
we're we're basically on a a brand new
[27:39]
system. And then the force main is uh in
town, so it's less cost than option two.
[27:48]
water option too. As I said with
facility cost would be less money at
[27:52]
first because you're developing
[laughter] at a um
[27:57]
a small area to start. You're not I'm
not we're not considering a mechanical
[28:00]
plant for that option. Um but however
there is a larger force man component if
[28:05]
you wanted to extend it outside of the
community very much like to
[28:14]
um if you go to the EA uh sorry the
master plans we've provided there's
[28:18]
there's more detailed review on the
costing in there as well in in the
[28:22]
appendices. So I tried to to keep this
as straightforward as possible but if
[28:26]
you have questions etc there there is
more details in the uh the master plans.
[28:33]
Next page please.
[28:38]
So next steps would be address remaining
comments from municipal staff council
[28:41]
and aqua make any adjustments edits etc
to the draft master plans. We would then
[28:48]
issue the final public notice called the
notice of master plan for each master
[28:52]
plan completion. It would be circulated
to the local indigenous communities
[28:56]
stakeholders um agencies [clears throat]
via email.
[29:00]
It should be posted in the local
newspapers and on the project website as
[29:03]
well.
Um [clears throat]
[29:07]
there is an opportunity to update the
frequently asked questions component of
[29:11]
the admissible website where we can take
some of the comments we've received and
[29:16]
provide other responses within that
specifically just to give the the public
[29:21]
uh you know address any more concerns
they have.
[29:27]
Item three then the master plans would
be posted for public comment on the
[29:30]
municipal project website. So the
physical final documents would be
[29:33]
available for public review and then you
could you would probably have a printed
[29:37]
out copy here as well for people to
review in office here.
[29:42]
Once that um review period ends
and um you know if there's major
[29:47]
concerns we we have to uh you know
people can put in the comments but
[29:53]
basically once that's done we finalize
the master plans and then the final
[29:58]
council approval of the master plans
would would occur after that.
[30:03]
Um
so again
[30:07]
the cost is um substantial as you can
see for for any option. Um
[30:13]
[clears throat]
you know the the master plans do give a
[30:17]
a bit of a detailed phased approach to
to completion of the work generally in
[30:22]
the near term which would be completing
the EAS identifying the preferred
[30:26]
solution
uh more advanced including treatment
[30:29]
recommendations etc. You would look at
property property acquisitions as
[30:33]
required. Um [snorts and clears throat]
you would initiate the start of the
[30:37]
buildout of the plants and the
infrastructure to service homes.
[30:42]
And then you get into the midterm where
you know the facilities you look at
[30:47]
again seeing as facilities need
expansion you expand to further out into
[30:54]
communities and then by the time you get
to the end of the the period then you're
[30:58]
you've developed your full full system.
So um obviously recommendations is the
[31:03]
master plan's a living document too.
It's not something you just sit you know
[31:08]
you you review it you you know there's
suggestions in the closure section of
[31:12]
the master plans you know to to monitor
your growth in the community and
[31:16]
developments and and adjust as required
um to meet the community needs. Um
[31:25]
for for funding of course you know the
recommendation would be to look for
[31:29]
grants and funding opportunities that
the government's put out federal
[31:34]
provincial uh to help support it and um
as we've learned from the last one uh we
[31:41]
submitted like having shovel ready um
properties definitely helps with grant
[31:46]
funding. So um and having all your ducks
in order like having your EAS done etc
[31:52]
[clears throat] really helps to get the
funding and and have more success rate.
[31:56]
So
um there's any other questions I will
[32:01]
hand it over. Thank you very much. Thank
you Chris. one you know
[32:09]
questions. Um
just on the one I guess you you talk
[32:15]
about grants and of course we we do too.
What do you see coming through mainly
[32:23]
for percentages in in grants?
[32:29]
I'm not familiar with too many at the
moment, but uh generally I think the
[32:34]
last one we tried was
33% funding roughly
[32:40]
funding.
>> Yeah. Up to a certain value and then you
[32:43]
have time restrictions and biggest
things are well the cost is obviously a
[32:47]
very big concern but
>> restrictions on getting the work done as
[32:51]
well. Right. I think
>> the last one we went after, you know, we
[32:54]
had about 2 years to have the
infrastructure built. So those are those
[32:59]
are things you have to be mindful of
>> and
[33:03]
the detailed master plans are quite
extensive
[33:08]
and and there's around 600 pages
involved and maybe it's embedded
[33:12]
somewhere in that report but
>> majority there's a lot of appendices. So
[33:18]
yes, there's copies of emails that takes
up probably half half of the report.
[33:22]
Okay. Climate change memos in there,
which is many pages. So main body of the
[33:26]
report is probably 60 pages of all that.
It's just all the attachments and
[33:30]
background.
>> I'm wondering, do you look at the
[33:34]
connections that we have, the hookups we
have, and associate a cost with a
[33:38]
hookup? Like is that in there?
>> The cost of um individual services to
[33:44]
property lines is included in the cost.
So when we get say
[33:51]
$60 million bigger and you get a 30%
grant, so it's still 40 million.
[33:56]
» Yes.
>> And so we But so with you, we mean we're
[34:00]
looking at our hookups are like when the
tree in line said maybe in water 350,
[34:06]
maybe 325 350.
>> And so you charge
[34:10]
» Sorry.
>> Sorry. What was the 350? Sorry. the the
[34:12]
number of present hookups that we have
in lights
[34:16]
» and [clears throat] I'm just wondering
just based on even the the expanded
[34:21]
growth
[clears throat] and include that in the
[34:25]
number of hookups what would we be
looking at per hookup
[34:31]
it could just to give us some idea say
we do get a like a 30% grant 33% grant
[34:38]
is is that in there or so I think
general Generally we included um between
[34:44]
5 to 6,000 for the physical pipe
installation from say the water man to
[34:48]
the crocket line um but
there are costs with rock removal etc.
[34:54]
So we've elevated that cost to almost
double basically to account for rock
[35:00]
removal and other things and we assumed
a trench width right to try and reduce
[35:06]
the cost to because of rock
because typically you would if you um
[35:12]
add it in you'd have wider area you'd
slope down and then you'd have your
[35:15]
water man in a kind of a box where we've
looked at more of a a vertical
[35:19]
installation to reduce costs.
So we don't have we don't have um
[35:24]
obviously
etc through the committee. That's that's
[35:27]
a an endeavor in itself. So we've
assumed higher higher risk and higher
[35:33]
more conservative costs just to show you
that it is [clears throat] a a large
[35:38]
endeavor. So there are more details in
in the um master plans but if you if you
[35:45]
feel you need more breakdowns we can
provide that information as well.
[35:49]
» Yeah. Yeah. Good. Thank you.
Uh what
[35:56]
you just so we're um you're talking
having your ducks in a row.
[36:03]
If we had property, you're suggesting
that it'd be a good idea to have EAS
[36:07]
done on those sort of in preparation or
or
[36:12]
um I'm thinking particularly at Gilmore
where we do have some properties. Would
[36:17]
it be beneficial to do sort of
preemptive EAS or Well, you you'd have
[36:22]
to do the EAS. Yes. Um you can you don't
have to do a separate EA for each
[36:27]
property. You can combine it into an
overall sale water EA looking at various
[36:32]
properties, land acquisition as needed,
and then the best routting for systems,
[36:36]
the best treatment types, etc. intake
location. So, it's all it's all under
[36:41]
one project. um you don't have to
separate it per site
[36:45]
but you know but there are studies that
are required [clears throat] in that um
[36:50]
you could do your your bore hole
investigations you could do um
[36:55]
you know the cost analysis depending on
where the best place to put the water
[36:58]
tower is you know so there's um there's
lots of studies that go into the EA
[37:05]
they're quite detailed so
[37:09]
so you could spend a lot of money I
think get to and not be able to afford
[37:15]
the capital project I guess is it would
risk anybody go into more detail on
[37:19]
phasing and how to establish it over
time um recommendations
[37:25]
um [clears throat] you know you don't
have to necessarily
[37:29]
do exactly everything in the master plan
the will go into them more detail and
[37:33]
and and
sus out the best the best solution.
[37:37]
I know master plans are kind of a
support you and your expansion of the
[37:42]
systems in the future and it's a broad
perspective but you have to get into the
[37:46]
more detailed EAS to to come up with
your your your best solution um for
[37:53]
treatment cost everything supporting the
community constructibility
[37:57]
so that's
>> well I was just thinking it doesn't seem
[38:02]
like that long ago when we did the
expansion to the Lion's Head water
[38:06]
treatment plant and we were telling
everybody this is going to be it for
[38:14]
because yeah it was quite a quite a blow
but I I got to ask a couple of questions
[38:19]
about these maps just so I I mean
there's lots here I don't understand
[38:23]
even though I'm old um the one on Okay,
so we take a look at the master plan for
[38:31]
my u and I mean obviously the key to any
of this is trying to predict or
[38:37]
predicting or looking at where
development is going to go in these
[38:42]
communities.
So if we take a look at page eight
[38:47]
um
preferred alternative expand water
[38:51]
servicing to downtown and community area
uh area I mean um to my at this point
[38:58]
does not have water. Um, in this map we
have uh the red slashes
[39:06]
are future development. Now I'm
wondering where where that I want where
[39:14]
that comes from where that information
is that people that have already put in
[39:18]
applications or uh because of our
planning documents or exactly where
[39:24]
those red lines come from.
>> Yes. So, so yes, the that information
[39:30]
came through dealing with planning with
municipality. So, there are
[39:34]
» so with that, so our municipal staff
pretty much told you where that that
[39:40]
would be
>> and and there's more detailed versions
[39:42]
of these as well. Um I kind of showcase
um breakdowns within those areas. So
[39:50]
those have so for example the wedge
shaped one on the top left it is
[39:56]
um there's more breakdown information
within that and same with the large
[39:59]
square area on the bottom right
>> so it does not necessarily have anything
[40:03]
like to do with our I guess it does have
to do with our planning documents but
[40:08]
that information was given to you by our
staff.
[40:11]
» Yes. And then when we went after the
there was quite a bit more details when
[40:15]
we went after the last funding the
Hughes application a couple years ago
[40:21]
um where we even showcased the kind of
the order that they would be developed
[40:25]
in. So the
>> so if I wanted to know the pro you know
[40:27]
the rationale or whatever then it's
either in the index or the municipal
[40:32]
staff reports. Okay. Uh so then uh same
thing when we switch to the master plan
[40:39]
for Lion's Head on page 16
uh the dark areas that are planned
[40:45]
development. So what is the dis
difference between future development
[40:52]
that I guess and plan development
because there's quite a lot of areas
[40:56]
here in the gray
uh that in the small uh hashtags plan
[41:02]
development. So where did where did that
information come from? Uh again
[41:09]
» similar
this the mapping and the color coding
[41:13]
etc was from documents provided by the
municipality. So
[41:20]
as accurate as we understand it it is
but uh
[41:25]
there is the opportunity to review it in
more detail as needed.
[41:29]
» Okay. because uh yeah, I I understand
we're very preliminary here. These we'll
[41:35]
certainly have some feedback from from
some of this for sure. Okay, thank you.
[41:48]
» So,
[41:53]
I know the bottom or this and I'm just
looking at lion's head which is not the
[41:58]
same. I know that the town area and the
urban area proposed for Totore is large,
[42:04]
very large,
but not so much so in Lion's Head. And
[42:10]
that sort of lays out to me the
boundaries of Lion. That's the town
[42:17]
boundaries of Lion's Head.
And [clears throat] so that
[42:22]
that section of his properties within
the
[42:25]
» Yes.
>> within the town. and and um and a mid
[42:29]
master plan we we did add in the more
street area as well. Um
[42:34]
» yeah,
>> discussion with the miss. So it it's
[42:37]
expanded quite a bit out to the the east
there along the shore and
[42:45]
from my own benefit. So out big tub road
and maybe
[42:52]
more people more you can tell me but
there there is something in that out
[42:56]
behind there on big tub road like there
are like
[43:00]
» there are lots
>> there are lots in there so that
[43:05]
yeah and [clears throat]
I guess
[43:10]
on the other side here there has been
some interest shown in
[43:14]
in development there
so and I'm looking east of Highway 6.
[43:23]
» These diagrams don't necessarily show
all the individual property lots per se.
[43:27]
It uh
I mean we could we could provide that
[43:31]
level of detail as needed if you want to
see that in the master plan but uh
[43:37]
we went into much more detail with Mory
since we were going after the funding.
[43:40]
So we were very very specific.
So uh Chris just on the separate you
[43:46]
talked about separation distance. I
wonder what is that separation distance
[43:51]
» for a water sewer?
>> Um well obviously when services into
[43:55]
homes you have to have you typically
want them separated for water and sewer.
[43:59]
And the same thing when you're building
say a treated water main and a gravity
[44:04]
sewer. The ministry usually has a
separation of 2.5 horizontal meters.
[44:10]
um just help and then just helps with
potential contamination. So if your
[44:14]
water man goes below 20 PSI and say your
gravity sewers here, you could have some
[44:20]
potential contamination entering water
main. So they're just trying to protect
[44:24]
that with rock installation. You know,
that's a rock remove, I should say.
[44:28]
That's a lot of money to to have a
trench that large. So there is so there
[44:33]
is some potential to request
confirmation from the the ministry to
[44:38]
I've had to do another job as well where
we were able to shrink that distance as
[44:42]
long as
um
[44:45]
you know your water man's higher than
your sewer. So we had to had to maintain
[44:50]
that. So instead of vice versa you know
if you had your sewer higher then
[44:55]
leakage from a sewer could come down
into the water man. So opportunities to
[45:00]
to um get them closer. You just have to
careful and and design them correctly.
[45:07]
» No, just told Andy the rock they got the
situation there. So it
[45:15]
you basically need trenches, I guess.
>> I know some with other water man
[45:20]
replacement jobs are in rock. We try and
um if we can install a new water man in
[45:26]
the same location. So you put up a
temporary system above ground, remove
[45:30]
the water man and reinstall the new
water man at a larger size within that
[45:34]
same existing trench assuming it was
installed properly originally.
[45:39]
» The other thing too, you talk about
upgrades to the water treatment plant in
[45:43]
Lion's head.
>> So that water treatment plant is not
[45:47]
operating at near capacity.
So what would the upgrades be to the
[45:53]
system? Uh
>> what would be
[45:57]
main things would be fireflow.
>> Okay.
[46:00]
» Um [clears throat]
so you'd have to have larger pumps.
[46:03]
» Okay. Um you know you potentially need a
larger space to in um generally it would
[46:12]
be just from a capacity perspective as
well. You may need more room to upgrade
[46:17]
the equipment as time goes by. And I do
realize yes, it's it's um not operating
[46:22]
at full capacity, but master plan kind
of goes through
[46:27]
the range of timelines for when you'd
have to look at expanding. So could
[46:32]
potentially connect some things on
at first, but then you'd have to upgrade
[46:39]
eventually if you want to keep anyway.
So yeah.
[46:43]
» All right. Thank you. Um, other
questions?
[46:51]
» Yeah, how about read through the master
plans if I know they just got them
[46:54]
recently, but um
more in depth look at those. Don't be
[47:00]
overwhelmed. The the main there's 300
400 pages of appendices. So, the main
[47:04]
body is probably 50 to 60 pages.
>> We can get through that. So,
[47:09]
» and uh field your questions to to Peggy
as well. And then we can if you have any
[47:13]
concerns we can we can look up them.
>> Well on behalf of council and staff uh
[47:19]
thank you very much for your
presentation.
[47:22]
You may hear more from us if not.
[laughter]
[47:37]
All right, we have one other delegation.
Joe Roach.
[47:43]
» Joe. Yeah,
>> right. Right there, Joe. Yeah.
[47:56]
» Was that mic on, Joe? Is a red Did you
turn it off, Chris? Yeah. Just press the
[48:02]
uh silver button there, Joe.
[48:08]
You're in business. Business. Okay. Um,
my name's Joe Roach. I was born in
[48:14]
Peterbor, Ontario.
Uh, and I had a successful
[48:22]
uh
career as a construction superintendent
[48:26]
building high-rise projects downtown
Toronto. I built my lakefront home here
[48:32]
in uh Little Pike Bay Estates in 1992.
And uh I just want to give you a little
[48:40]
history of uh of what happened there.
And uh I call it the Big Con.
[48:47]
Uh it was the last frontier for
Lakefront. Um
[48:53]
um they were offering 2 acres lots of
damaged land uh ravaged by winds.
[48:59]
Infestation of the balsam tree choking
the native trees causing underbrush and
[49:05]
dangerous forest conditions for the last
125 years.
[49:10]
Um these are low elevation lots and uh
they had to they had to get them sold.
[49:18]
Um they were offering these lots back in
1985 for approximately $35 to $40,000.
[49:26]
They flocked from Kitchener and G and
List.
[49:30]
Um the municipality of North Bruce were
not proactive in solving problems of
[49:36]
bylaw. So you are the target.
Um they off they they said that the
[49:43]
cottages just had to be 50 feet back
instead of 100 to 300 ft depending upon
[49:51]
lot elevation. I don't understand this
50 ft uh should be feet above sea level
[49:58]
and it should be a meter at least to the
underside of footing. They are also
[50:04]
doing stone underneath the footings.
It's not cold. It must be engineered. Uh
[50:10]
I I I I made my first uh myself known in
1992 when I came up and uh had a foot
[50:18]
and a half of stone all nicely spread
looking really nice. And I
[50:22]
[clears throat] made the uh the
excavator take it all out. My footings
[50:27]
went on top of rock, not stone. Stone
water don't mix. Uh too much up and
[50:33]
down. No way. Um
[50:39]
all the boulevards were left in poor
shape, stumps, trees, rocks, etc.
[50:44]
There's absolutely no direction in
lakefront problems. High wind, high
[50:48]
water does not include waves and sees.
Uh how about waves throwing rocks?
[50:58]
For God's sakes, leave your trees at the
front. It's the first line of defense
[51:02]
against wind or snow. These are things
that should be, you know, discussed with
[51:07]
the people coming up here that don't
know anything that actually they think
[51:11]
they know everything, but they don't.
And uh what about the cleanup?
[51:16]
Absolutely nothing.
Um okay. Uh you know quite simply put
[51:23]
the force in and little pike bay estates
and Hobson Harbor these are the two
[51:27]
areas where I have uh properties don't
meet the safety standards set by the
[51:33]
Ontario
>> [clears throat]
[51:34]
» uh the province of Ontario they are
infested by dead trees under bluffs that
[51:41]
is that is dangerous to the public first
responders and emergency personnel. It's
[51:48]
so thick you can't get to or see. It'll
burn so hot you can't part it out. Um,
[51:55]
what about insects and rodents? These
are the the only thing that looks nice
[52:01]
is the driveway and the place where you
have your your your home. The rest of
[52:06]
the property is ignored. So, I mean,
like it's uh I've been there for over 30
[52:13]
years or 35 and uh nobody operates a
chainsaw. Nobody cleans up. Um the the
[52:22]
only person I've seen that was your
father and he got that from me.
[52:30]
And of course, Stan cleaned up and the
judge cleaned up and that's it. the
[52:35]
Bradley, they uh did a half to ask job,
too. But anyway, um
[52:42]
okay, where are we here? Uh there's no
physical due diligence
[52:48]
from North Bruce. Why is nobody
addressing these problems? I mean, like,
[52:54]
uh you got two problems. You have a
problem with the safety and you also got
[52:59]
a problem with fire. Now, I guarantee
you that
[53:04]
that don't look like that picture there,
Haw Road and Hobson Harbor. There's no
[53:10]
way. It's uh I I just cringe every time
I see the the the underbrush. It's just
[53:17]
makes me ill. Um okay, here's what
[clears throat] happened. Okay, bylaw
[53:23]
refused to meet and this isn't the first
time I got the Department of Labor
[53:28]
involved. Then I got some attention.
bylaw was to bring the fire chief and we
[53:32]
had a meeting right on my front porch
unannounced. It was lucky I was home,
[53:38]
but I guess he shook him a bit. Items
discussed. We discussed a fire line. I
[53:43]
mean, uh, it's possible. I think it's
worth discussing. Um, absolutely
[53:50]
no due diligence at all. There's some
paperwork and stuff saying we're going
[53:55]
to do that and you should do that, but
nothing physical. I mean, if a fire
[54:00]
broke out, uh there's going to be a lot
of questions asked here. And we got our
[54:05]
pants down. There's um there's no way.
Uh you guys forecast severe wildfires.
[54:12]
Wow. I can guarantee you we're not cut
out for that. Um I'm not talking too
[54:19]
loud, am I?
>> You're okay.
[54:21]
» You're okay, Lord. Um
>> Okay, good. Um,
[54:27]
access for emergency personnel and first
responders through properties. That's a
[54:32]
must. I mean, people live there. It's
full of cottages, blood, all kinds of
[54:38]
stuff. Yeah. The the fire personnel has
to get through and so do first
[54:43]
responders. Um, people need to be
shocked.
[54:49]
The attitude of the land owners is uh an
attitude of ungrateful and indifferent.
[54:56]
You get this is our land and we can do
what we want. Uh you can't make me.
[55:03]
These are the obstacles we have. I don't
know. Uh I in a construction project
[55:09]
when I things didn't go my way safety. I
shut her down. The crane stopped moving.
[55:15]
I shut the power off. hauled in
Department of Labor. Let's solve the
[55:20]
damn problem.
Hell, if I if an accident falls in one
[55:25]
of my job sites, man, they're going to
hang me.
[55:29]
Anyway, uh red tag properties.
These are also discussed. Um
[55:39]
by law actually said that we wouldn't be
the first uh to be looked after. So that
[55:45]
led me to believe that our community is
not the only one that has a problem.
[55:51]
Frankly, I'm having trouble with the
careless handling of this issue and the
[55:56]
way it's been handled.
[56:01]
Whoops. Sorry. Um
[56:06]
to
[56:13]
lost a piece of paper. Okay. Bang. Bang.
Okay. Um,
[56:20]
here's what I suggest. All V, all the
boulevards in our be cut back. All the
[56:26]
trees removed. Cut back to the actual
property line. You take a measurement
[56:30]
from the center line and measure. You
don't need to be exact. Who cares?
[56:35]
They're not going to care. But that's
got to be cleaned out. I mean, you have
[56:38]
to show due diligence, right? We need
safe access between the homes. You don't
[56:43]
have to uh they have all this underbrush
because uh they don't want to put a
[56:47]
fence or it's for privacy. No, you
can't. They have personnel going through
[56:52]
falling trees, dead trees, underbrush.
That's just wrong. Um it's just been
[56:59]
poor leadership from the township on the
uh all these issues and the possible
[57:05]
fire line cut uh the borders
neighborhoods. I don't know what else to
[57:11]
do on on this thing. I I don't know. How
about
[57:18]
just being as this is a safety issue and
it's nothing is been handled. I'm
[57:23]
surprised that you don't have any
cleanup in this at all. This is claiming
[57:30]
action together and just absolutely no
clean up. There's no
[57:36]
no pressure put on the homeowner to
either [ __ ] or get off the pot.
[57:43]
I don't know. What do I have to do? Call
for the resignation of the CEO and the
[57:48]
bylaw officer? I I think they're
floating. Well, how do you give us a
[57:53]
chance to let them respond to council,
Joe? So that we like we need to we need
[57:59]
to see what is what
>> Yeah. Okay, fine. I'm being a little
[58:02]
harsh, I guess, but uh
>> well well maybe not. Who knows? But we
[58:08]
um we just need to see what what kind of
answers you're getting.
[58:13]
» What do you mean answers?
>> Well, you you're suggesting there's a
[58:16]
whole lot there's quite a bit of stuff
go wrong in in your presentation here.
[58:20]
» Yes. So, I I'm just suggesting that we
the council or the staff inform counsel
[58:28]
uh responding to your concerns to see if
we agree with what they're what they're
[58:33]
telling us and you and so you want to
take this further. Is that what you're
[58:38]
suggesting?
>> I I I'm suggesting we want to see what's
[58:42]
going on. We want to we want a report to
outline our response [clears throat]
[58:47]
to your your questions.
>> Okay, fine. So, who's going to do a
[58:50]
report?
>> Uh, well, you're you bylaw is number
[58:54]
one. You're you're suggesting bylaw.
>> Of course, there's nothing happening.
[58:59]
» Fire. We'll have our fire department.
Uh,
[59:02]
» absolutely. They're they're not uh well
equipped enough. I I know.
[59:06]
» Okay.
>> Like, you know, I when I hear words like
[59:11]
severe wildfires,
>> Yeah.
[59:14]
» that kind of bothers me.
>> We don't want them.
[59:17]
» No way. Y
>> and we have to be ready and we're not.
[59:22]
These forests drawing these communities
a mess.
[59:25]
» Yeah.
>> Give us a chance to respond, Joe.
[59:29]
» Yeah. Okay, fine. And we'll see where we
go from there.
[59:32]
» Okay. Item number two.
>> Uh yep. Uh yeah, go ahead. Uh you have
[59:38]
» I was just going to ask are these all
private properties?
[59:42]
» Yes.
>> Okay. Uh well,
[59:46]
» yeah, they're all private properties,
but I mean uh they're all like um
[59:53]
in this little pipe states, there's a
lot of empty lots or developers,
[59:59]
you know, uh and the land in behind is a
a forest that's unmanaged.
[1:00:05]
Because I we have to kind of look at the
bigger picture too because we well we
[1:00:11]
have huge tracks of conservation lands
and federal lands that we really don't
[1:00:20]
have any control over and they have
different measures as far as how uh some
[1:00:29]
I personally have been wary of the fire
issue too with the amount of
[1:00:36]
conservation and federal lands where a
tree falls down, it just stays there.
[1:00:42]
So, uh, but what we'll need to know like
what's the difference between federal
[1:00:50]
and private lands as far as cleanup to
me because even though I've been
[1:00:56]
[clears throat]
pounding a little bit about fire like
[1:01:01]
national parks, huge tracks of
conservation lands that aren't managed
[1:01:06]
for for fire uh and getting nowhere.
just so what the difference is with with
[1:01:12]
private lands. So I I was just curious
if these were all private lands. So I'll
[1:01:18]
quit talking, let you get on to number
also too like in my area like it's not
[1:01:24]
the streets. It's all dead popular. Th
these are widow makers on private land
[1:01:30]
and if if there was a fire about uh in a
2acre property, you won't be able to see
[1:01:35]
it, but you have to go in there and
these trees will fall right on you or
[1:01:39]
you can't even get to it. Okay. Uh um I
don't know. You obviously you have to
[1:01:46]
get lawyers involved or maybe uh you
have to make them do it or uh or they
[1:01:52]
have to hire someone. I I it's going to
cost him a lot of money, I would think.
[1:01:57]
And um but I don't know. I did it. Uh I
do a little bit at a time and I know
[1:02:03]
your dad did it and uh that's the way
all the lot should look and uh it's it's
[1:02:09]
an issue now because of climate change
and uh uh all we need is a is a little
[1:02:15]
drought and it could be next month or
sometime in September or next year, but
[1:02:21]
we're going to get it. And uh uh all it
takes is a lightning strike south of me
[1:02:26]
along the edge and there goes my house
because it's just a mess of trees in
[1:02:32]
between the properties you can't get to
I
[1:02:37]
» Okay, that good enough.
>> That's good enough, too. Yeah, that's
[1:02:41]
that
number two.
[1:02:44]
» Sure.
>> All right. Okay. Uh and this new guy
[1:02:48]
moved in next door to me, just north of
me. And uh Joe, what is the what is item
[1:02:53]
number two? Just to
>> Well, it's just that just he put the
[1:02:56]
wrong uh the roadway in the wrong side.
It's on the wrong side of the lot.
[1:03:01]
» Oh, okay.
>> I I don't know how you can prove prove a
[1:03:05]
a roadway without seeing a park.
>> Okay. He got a nice little uh wind
[1:03:12]
tunnel. That's just unbelievable. He's
opened up 80 ft in the front. 80 ft. He
[1:03:17]
put his driveway on the wrong side. So,
you got a nice nice wind tunnel there.
[1:03:22]
He uh he moves his house over 25 ft.
Angles it. So, I got a nice funnel
[1:03:27]
coming in. He's got a 12ft drift uh
coming up right on our border. He's
[1:03:32]
knocking my trees over. He's already
lost a lot of trees. He doesn't care.
[1:03:37]
He's a developer. He's got his house
perfectly on one side. All his services,
[1:03:43]
water, everything is over here. This
side, he wants to sever and build
[1:03:48]
another house. someday. That's his plan.
>> Okay. So, you want us to have a look at
[1:03:53]
that driveway?
>> I want you to please look at that
[1:03:55]
driveway and find out. I mean, this plot
plan is a secret thing. You can't get to
[1:04:01]
it unless you hire a lawyer. So, look at
the plot plan. I'd be interested to know
[1:04:06]
where he put the wall.
Yeah. On that plot plan because it's
[1:04:11]
over there stacked right behind the the
septic. Now, I bet you it's a dollar to
[1:04:16]
a donut. It's not 50 or 60 ft away, but
that's fine. Whatever. Maybe it is. I
[1:04:22]
didn't measure it. But, uh, he wants to
put another building there someday. I
[1:04:26]
know it. All right. Okay. I want a
fence. I want him to lay out the
[1:04:31]
property. Uh, property line. I need a
fence. Uh, uh. Um, there's one other
[1:04:37]
issue
he's got to do. He's got to
[1:04:42]
» Well, that's enough for now, Mayor. I'll
hear
[1:04:44]
» that'll keep us busy.
>> Is [clears throat] that okay? Yeah.
[1:04:47]
» Are you all right?
>> That's You did fine.
[1:04:50]
» Yeah. Thanks.
>> Yeah.
[1:04:53]
» Um Okay. Um when will I find out some
kind of progress on this or
[1:04:58]
» uh I'll just look to our CEO here and
give us an idea of a timeline.
[1:05:05]
» So, as per council direction, we will
report back at the next council meeting.
[1:05:10]
» At that point, once council's received
it, we will send you a copy of that
[1:05:14]
report.
>> Okay. Super. So, it would be a good idea
[1:05:16]
to come next council me.
>> Uh,
[1:05:20]
we will get the report.
>> Yeah.
[1:05:22]
» And if you you can look at the report.
Uh, you would have to make another
[1:05:27]
delegation to council. Did you you
contacted the clerk? Right.
[1:05:32]
» I did.
>> Good. And if you [clears throat] you're
[1:05:36]
best to look at the report and see what
you think.
[1:05:38]
» So, then you when will I get the report?
Uh the report will is it August 13th our
[1:05:45]
next council?
>> August 10th is our next council meeting.
[1:05:50]
» Okay. So I'll have it by then. Right.
>> So you'll uh that it'll come out on the
[1:05:55]
Thursday before August the 10th. So
whatever date that is that would be
[1:05:59]
» to pick it up. Then I'll save the mail.
You can call me.
[1:06:03]
» Uh would you call me let me know and
I'll come and get it.
[1:06:07]
» Okay. Okay. I just want to stress that
uh when you get the Department of Labor
[1:06:12]
involved
uh I don't know uh due to due diligence
[1:06:17]
is really handy.
>> Okay.
[1:06:19]
» Really handy. Okay. Thanks guys. Nice
show.
[1:06:29]
All right.
[1:06:37]
Go on to our agenda.
[1:06:48]
Well, considerations of a jog items and
uh first of all is the CIO reports.
[1:06:56]
is that council direct staff to submit
an application to Bruce Power through
[1:07:00]
the regional municipal readiness
assessment fund for the following
[1:07:03]
studies. 12 water treatment expansion
review and the municipalities parks and
[1:07:10]
recreation master plan review
[1:07:15]
second that Smokey Todd.
[1:07:20]
So just a question and and so what do we
get beyond
[1:07:26]
I I in [clears throat] your report
outlines it but beyond what we already
[1:07:30]
know Peggy with the with the uh so the
presentation we had here today the
[1:07:36]
information that's in that report uh
what do we get that's
[1:07:41]
above and beyond that.
So this essentially is the next step on
[1:07:47]
sighting for a treatment center within
toll my as Chris has stated is that uh
[1:07:54]
the next step is to do a sighting to
ensure that you know uh updated costs
[1:07:59]
are provided to council. Um so we would
look at those at the sections that
[1:08:05]
have been provided already to council
through the master plan and check out
[1:08:10]
their feasibilities for those areas. um
once they found a feasible area the next
[1:08:15]
step would be involved was providing for
the EA. So this is just a small step in
[1:08:21]
the process. However, uh providing a
grant does save the municipality some
[1:08:27]
costs and also keeps momentum up in this
project itself.
[1:08:32]
» Yeah. No, I think the uh I just wasn't
sure what that would give us beyond in
[1:08:36]
that one. I mean the recreation master
plan that's that's good. That's that
[1:08:40]
needs a bit an update. Okay. Any further
corre?
[1:08:45]
» So really we've got two asks here. Is it
weighted or we're just throwing them
[1:08:51]
into the mix and hoping for the best or
>> uh I have had consultation uh with the
[1:08:58]
Bruce C group and they believe that both
are good candidates for uh the funding.
[1:09:05]
Hence we may receive um half for each or
but as stated before this does allow for
[1:09:13]
us to continue momentum as a master plan
for sighting of the uh treatment center.
[1:09:22]
Other questions? Call the vote. All in
favor?
[1:09:27]
The motion's carried.
CEO uh report number two. Uh the council
[1:09:34]
receives report CAO26-09
as information regarding the acquisition
[1:09:39]
of lands airlines head for future
recreational and community
[1:09:44]
infrastructure opportunities.
Second for that one. Rod.
[1:09:51]
Any questions, comments?
[1:09:57]
Call the vote. All in favor?
Opposed? Motion is carried.
[1:10:06]
Uh item number item number CO
[1:10:12]
is that uh council approves the creation
of two permanent full-time waste
[1:10:16]
management operator positions subject to
completion of the required collective
[1:10:21]
agreement discussions with local 266.
and that staff be authorized to engage
[1:10:26]
with the local 266 regarding the
required amendments to the collective
[1:10:31]
agreement including classification and
wage placement [clears throat] and that
[1:10:36]
the following completion of the labor
relations process
[1:10:41]
staff be authorized to proceed with
recruitment and implementation of the
[1:10:44]
positions
[1:10:50]
along
any question regarding that
[1:10:56]
» right.
>> So this this could happen internally
[1:10:59]
potentially but we're looking for in
[clears throat] blood. Right.
[1:11:03]
» Correct. So we would follow uh the
internal and external process for hiring
[1:11:09]
um for these two positions. Uh we have
already started discussions um with OPSU
[1:11:16]
and uh they are in agreement with the
job description. So the next step would
[1:11:21]
be amendments to the contract and uh
wage placement.
[1:11:27]
» Uh Smoky.
>> Um yeah, just so I get this clear in my
[1:11:31]
head, we're looking for
two
[1:11:35]
more employees that will be full-time
that will strictly be on garbage.
[1:11:43]
That is correct.
>> Okay. Um,
[1:11:47]
it's just that in my, of course, I have
things going on in my head that no one
[1:11:52]
knows. [laughter] But I mean, I guess
originally I kind of thought, okay,
[1:11:56]
we're doing our own garbage, which is so
uh we have so much more garbage in the
[1:12:03]
summer
uh than we do in the winter, and we uh
[1:12:09]
have so much more snow in the winter
than we do in the summer. So, is there
[1:12:16]
not some way to make this work for the
municipality? Like, perhaps we're going
[1:12:23]
to do that at any rate, but uh rather
than hire two more full-time employees,
[1:12:32]
um I'm just
just questioning that because I'm going
[1:12:37]
to be questioned about it. So, uh I
would like to know the rationale why. Uh
[1:12:43]
and and I suppose the
should we really just give this the
[1:12:48]
first year I I'm just questioning the
rationale behind that because I had
[1:12:54]
thought perhaps you know we could make
this work within our staff or maybe how
[1:12:59]
many staff do we think we're going to
need to do our own service perhaps this
[1:13:04]
is reasonable be you know uh but I'd
like an explanation on it
[1:13:14]
The only way that we can explain this is
that um at each new term of council,
[1:13:19]
council provides a direction for the
role of service and corporates or
[1:13:25]
full-time staff. So our staff currently
right now are working full-time shifts
[1:13:31]
to provide for a new business unit
within the public works department.
[1:13:37]
council would have to advise of which
level of service that we would require
[1:13:41]
to cut to actually provide for that
collection service. So right now I we're
[1:13:47]
anticipating that it won't be be a one
day event of garbage collection similar
[1:13:53]
to currently what is being held on
Mondays. Waste management brings up 7 to
[1:13:59]
eight trucks on a Monday to actually do
all of our collection. that will be
[1:14:05]
impossible for us to complete. So for us
to at least provide 4 days of 10-hour
[1:14:12]
shifts, that's 40 hours right there. Uh
potentially there are going to be days
[1:14:17]
that things might be very luxed, but we
still have to actually travel the entire
[1:14:23]
municipality to actually pick up each
garbage and visit each site. Hence why
[1:14:29]
we're so looking at a certain structured
day of it. If we could go to one staff,
[1:14:36]
that would be great. However, we do
require to have two staff to do the
[1:14:40]
service. We are also looking at a
potential for a casual part-timer in
[1:14:47]
case of sickness.
That right now will be
[1:14:52]
uh provided by current staff members if
required. Unfortunately, right now we
[1:14:58]
are already on a full workload during
the day and to move two other staff into
[1:15:04]
a [snorts] another business unit would
require us to look at something a
[1:15:10]
reduction lie service for something
else.
[1:15:14]
Thank you for the explanation
and uh it's it's on recording so I will
[1:15:21]
any then I'm asked you know why we can't
make this work I will direct people to
[1:15:28]
your explanation. Thank you.
>> Yeah we also had a report last meeting
[1:15:34]
that outlined uh the whole
service that we're going to try and
[1:15:40]
provide in house. So that report is a
detailed report and it spells out why we
[1:15:45]
need two people and uh
yeah I I think it uh I think it warrants
[1:15:54]
if we're going to provide our own
service and that's what we decided at
[1:15:58]
the last meeting that we were and we
need staff to do it. So
[1:16:03]
yeah,
>> and also the just the curiosity that
[1:16:08]
these will be full-time. [snorts]
This will be the job description is that
[1:16:14]
this is what they do. We're not looking
at people that can go in between jobs,
[1:16:20]
do this or do the other work.
So that's clear as well that it's
[1:16:26]
strictly on the garbage. Okay. Thank
you.
[1:16:31]
All right. Uh, further questions,
comments,
[1:16:35]
call vote. All in favor?
Opposed? The motion's carried.
[1:16:41]
Uh, clerk's department is the joint
compliance audit committee and that
[1:16:45]
council direct staff to bring forward a
bylaw to appoint members to the first
[1:16:50]
county joint compliance audit committee.
[1:16:54]
and secretary for that one. Todd and
Rob.
[1:16:59]
Any questions on that one?
Call the vote. All in favor?
[1:17:06]
Opposed? The motion is carried. The
clerk's report again. Uh item B has a
[1:17:14]
[clears throat] council direct staff to
bring forward a bylaw to delegate
[1:17:17]
authority to the CAO during a lane duck
period.
[1:17:23]
executive for that one. Smokey, I'm on.
[1:17:28]
Any questions on that one?
>> Call it Linda. [laughter]
[1:17:37]
» All right.
[1:17:45]
» All right. And lame duck it is. Call the
vote. All in favor?
[1:17:52]
Buried.
[1:17:56]
Uh we're a treasury and that council
authorized the mayor clerk to enter into
[1:18:01]
agreement with uh our new doctor and I'm
not going to try and pronounce that
[1:18:05]
name. Peggy, do you we will just say we
are very delighted to have a new doctor
[1:18:10]
join the Peninsula Family Health Team.
line said and when they do
[1:18:16]
uh we we uh agree to enter into an
agreement with them.
[1:18:23]
So motion to bring that forward Todd and
Rod.
[1:18:30]
Any questions on that?
Call a vote. All in favor?
[1:18:36]
Opposed? The motion is carried.
Next we go to public works and that um
[1:18:46]
council approves the purchase of a new
2025 freight liner uh rear loading
[1:18:52]
refuge truck in the amount of 318,000
plus HST
[1:19:04]
on
any questions on that one. So, you were
[1:19:10]
able to get that one, Troy. Hey.
>> Mhm.
[1:19:15]
» Yes, we have a a hole on it right now
until the approval from council. So,
[1:19:20]
» okay.
>> We're very fortunate that uh there was
[1:19:23]
one one a new one available. So,
>> yeah. Um also uh before we can apply to
[1:19:31]
get our licensing to be able to do
collection uh through thee, we have to
[1:19:36]
have [snorts] uh a truck in place to to
secure that licensing for to do the
[1:19:42]
collection. So this is kind of the first
step in getting our approvals to do it.
[1:19:45]
So
[1:19:49]
all right, any questions?
Call the vote. All in favor?
[1:19:55]
Opposed?
Motion is carried.
[1:20:01]
Item B, public works and that council
awards the winter sand tender to Hunter
[1:20:06]
College and Excavating Inc. for the
amount of $147,776
[1:20:14]
excluding HST.
[1:20:19]
Move by second by Ammon.
[clears throat] Any questions?
[1:20:25]
Call the vote. All in favor? Oppos? The
motions carried.
[1:20:31]
Parks and facilities. The council
accepts the proposal from Triphase Group
[1:20:37]
in the amount of 66,955
plus HST for demolition and site
[1:20:44]
restoration of three Centennial Drive
inclusive of designated substance
[1:20:50]
removal, backfill compaction and
securing preservation of on-site hydro,
[1:20:57]
water and septic.
Move and second to relax.
[1:21:02]
Todd Rod
the uh substance removal.
[1:21:10]
Peggy, what? Ellen Clark, sorry. Uh yes,
through you, Mr. Mayor. Um
[1:21:16]
there was um the assessments done on
various municipal buildings. Um, this
[1:21:22]
building had a small amount of asbestous
containing material in the
[1:21:27]
» floor tiles of one of six bathrooms. So,
it's very small amount,
[1:21:32]
» but it [clears throat] still has to be
uh treated and disposed of according to
[1:21:35]
provincial regulations. So,
>> right.
[1:21:40]
» All right. Any further questions on
call the vote? All in favor?
[1:21:47]
Opposed? Motion is carried.
[1:21:52]
Item B is uh build community strong fund
grant application
[1:21:58]
and the council authorized staff to
submit a funding application to the
[1:22:02]
build community strong fund for the
replacement of the noted roof surfacing
[1:22:07]
HVAC
and refrigeration and the equipment and
[1:22:12]
equip and refrigeration equipment sorry
in the Lion Head Community Center and
[1:22:16]
Arena to be proposed in the 2027 7
capital budget
[1:22:22]
and second year on Smithy.
[1:22:30]
Mark, you want to give us a little
update on that?
[1:22:34]
» This is a good funding opportunity
specific to the um the refrigeration
[1:22:40]
system of the arena.
Um
[1:22:44]
and uh Simco Refrigeration who's doing
our capital improvements this summer is
[1:22:49]
helping us write the grant and uh
reinforce the grant. Uh there's no
[1:22:54]
commitments there. Um doesn't cost us
anything for their assistance [snorts]
[1:23:00]
in the report and uh it does align with
our asset management, building condition
[1:23:06]
assessment reports and our capital
planning for next year.
[1:23:11]
» Okay, good. So these are all items that
are due in the next year or two for
[1:23:15]
replacement. So right.
All right. And any further questions?
[1:23:26]
All in favor?
Post. The motion is carried.
[1:23:33]
Item number C for facilities is Tromary
Community Center flooring.
[1:23:41]
That [clears throat] council waves the
purchasing policy section 5424
[1:23:45]
soul source supply of goods and or
services for the purchase order of
[1:23:50]
specialized flooring product. And the
council accepts a quotation from
[1:23:55]
Advantage Sports
for the supply and installation of
[1:23:59]
target Omni Sport multiplex flooring to
the main hall of the Troy Community
[1:24:05]
Center in the amount of 79,500
plus HSG for the specs of the quote a
[1:24:12]
July 20th 2026
[1:24:16]
for that one.
Do I not
[1:24:21]
Any
comments on that, Mark? Yes, Rob. Sorry.
[1:24:26]
» Just a humorous humorous idea.
>> Okay.
[1:24:31]
» Maybe it's okay. Yeah.
>> So, this is actually the third floor we
[1:24:35]
had in there. The first floor they put
in. [clears throat] The guy that made it
[1:24:40]
was a good smoker and that wasn't trying
to get smokeable.
[1:24:46]
But he also had paper matches that he
flipped out on the floor and they tiled
[1:24:50]
over top them.
So we went into
[1:24:56]
the new floor and
they had to rip the whole thing out and
[1:25:01]
start all over.
>> Oh god.
[1:25:04]
» Don't smoke at work.
[1:25:10]
» Yeah. So this flooring
>> Yeah. So, [clears throat] the current
[1:25:13]
tile flooring is similar to the tile
flooring in in this room. Um,
[1:25:18]
when you're there, if you've ever taken
a close look, uh, there's a fair bit of
[1:25:22]
bubbling occurring in some of the floor
tiles in various lines where we believe
[1:25:28]
the
the seams are in the concrete subfloor.
[1:25:32]
Um, it appears to be a moisture problem.
Not that the concrete is deteriorated,
[1:25:37]
but it caught the moisture problem. Uh
shows up kind of hard to explain why,
[1:25:44]
but it it does. Um and it can lift
separate the glue the adhesive from the
[1:25:49]
tile and it causes a bubbling of the
tile. Um our floor maintenance ends up
[1:25:56]
uh
grinding those tiles as they get raised.
[1:26:01]
We have a floor machine.
um and then they will eventually dry,
[1:26:05]
crack um and they become an uneven floor
hazard for users of the facility. So
[1:26:11]
what's there currently has been
repaired. Those seams have been repaired
[1:26:15]
prior. Uh we have been monitoring the
floor. Um it's deteriorated a bit
[1:26:20]
quicker than we had hoped this year,
this summer. um to the point that I have
[1:26:26]
concerns that we should be looking at
replacing it now rather than waiting
[1:26:31]
until uh next year in the capital budget
process. October is our best month in
[1:26:37]
terms of downtime for redoing the
flooring in the hall and transition
[1:26:41]
between different user groups and pickle
ball. The other advantage to changing to
[1:26:46]
the changing the floor product surface
is uh the floor product that we're
[1:26:52]
recommending uh will come with painted
lines for the pickle ball courts. So
[1:26:56]
there won't be the masking tape
application
[1:26:59]
uh that's uh laid and then removed each
time the floor has to be waxed and
[1:27:04]
stripped. So So there's some advantages
that way. And this product comes with an
[1:27:09]
actual vapor barrier, moisture barrier
underlay, which would should prevent any
[1:27:16]
further future uh moisture issues to
whatever flooring we put down. So,
[1:27:24]
will the floor just be a
white color or gray color with the lines
[1:27:28]
on it? I see some like planks and
>> Yeah. So, in the photos in the report,
[1:27:34]
it shows the the most prominent color
pattern they use, which is a wood
[1:27:38]
pattern. It's a vinyl sheet roll, 6 ft
wide, so there'll be less seams, and the
[1:27:45]
seams are heat welded and glued uh to
the floor. Um, and they offer some
[1:27:51]
cushion resistance for sport playing.
So, we do have pickle ball that plays in
[1:27:56]
there to be more friendly to their
joints.
[1:27:59]
Um, it's easier to maintain. It's
mopping and or we can still use the
[1:28:03]
floor machine. We just don't have to
strip and wax twice a year, which is a
[1:28:08]
multi-day endeavor twice a year and
about $1,000 in materials each year just
[1:28:12]
maintaining the existing floor. So,
[1:28:17]
thank you. Any further questions? Call
the vote. All in favor?
[1:28:23]
The motion's carried. Go to building
department A. Item A.
[1:28:29]
The council approves the application for
an exemption from the T trailer bylaw in
[1:28:35]
consideration of the unique circumstance
pre presented
[1:28:41]
second for that. Uh Smokey Todd
I just don't quite get this one here. I
[1:28:53]
» speak when my mic is not here but
[1:28:58]
» that's right beside the U house that
burnt down
[1:29:02]
and I guess the stench and the smell
from the what's left of the building
[1:29:09]
» okay
>> is pretty overpowering. So these people
[1:29:12]
have another lot they'd like to move the
trailer up there shortterm only until
[1:29:18]
Okay. Yes.
Sounds good. All right. Any further
[1:29:23]
questions? Call the vote. All in favor?
Opposed? Motion is carried.
[1:29:32]
And we go to the item six on the agenda,
the minutes for the museum for June 9th,
[1:29:40]
2026.
[1:29:46]
You want a motion to
[1:29:51]
go item number seven correspondence
requiring council direction.
[1:29:57]
So there's the Rotary Club. We've had
the report there from them
[1:30:02]
requesting a temporary patio license at
the Rotary Hall. So that's the new patio
[1:30:07]
that has been added to the Rotary Hall.
They would like support their license
[1:30:15]
area during
summer basically.
[1:30:20]
Yeah.
[1:30:24]
Goodbye.
Second by Rod.
[1:30:29]
Any questions?
Call the vote. All in favor? Post. The
[1:30:34]
motion is carried.
[1:30:38]
Um, Larry Huds, Larry Cousins, you're on
drive road access.
[1:30:47]
Uh, Troy, do you want to speak to a
little bit? I I mean, I guess I kind of
[1:30:52]
get, you know, I'm just
looking here at at your response, Troy,
[1:30:58]
and and just it says or continued on
page two. It says or continued
[1:31:04]
availability of the route
and it's just
[1:31:10]
and I'll let [clears throat] you just
have a look at that and this is probably
[1:31:13]
some legal advice we got but
[1:31:19]
» yes so this was a letter was in response
to the um letter that we uh
[1:31:26]
correspondence we received from the
interior landlords association.
[1:31:29]
» Yeah.
>> Oh okay. Yes.
[1:31:31]
» Yeah. So this was a letter that went to
back to them in response for their for
[1:31:36]
council support you know that they have
used that access and I believe uh the
[1:31:42]
Mr. Cousins I believe is one of the
owners on in that area and maybe was
[1:31:48]
just maybe partly confused about what
the letter was was about is kind of my
[1:31:54]
understanding but
>> um because really there's no change in
[1:31:58]
anything that we've we've done. So,
>> okay, that dates back to that Ontario
[1:32:03]
land request. Okay.
>> All right.
[1:32:10]
Um,
[1:32:15]
so
I'm just, uh,
[1:32:21]
so he responded though to your letter,
Troy, right? And here.
[1:32:27]
» Yes, that is correct.
>> Yeah. Yeah.
[1:32:30]
And are we do we respond back to him or
>> we could respond we could respond back
[1:32:37]
to him with and uh clarify what his
Yeah, we could do that.
[1:32:43]
» Sorry.
>> Yeah. Yeah. Good.
[1:32:45]
» Yeah. There just seemed to be some
unease about the way our letter came out
[1:32:50]
and that's just the legal ease that we
have to use. But I think he just
[1:32:55]
» you said it there. Nothing will change.
>> Yeah. Yeah.
[1:32:58]
We staff can do that.
>> Sounds good.
[1:33:02]
Uh and in the uh the mystery of energy
and minds
[1:33:08]
and uh
is there anything here that uh staff can
[1:33:14]
mark or who who would look at this a
little bit to see if there's anything
[1:33:19]
here that we can
[1:33:24]
I'll just direct it back to staff to
have a look at it and there may there
[1:33:29]
may be some opportunity
[1:33:32]
extra little other business.
[1:33:37]
Does anyone Yes, go ahead. Um yeah, I
just uh wanted to re um I asked a few
[1:33:45]
weeks ago about the progress on the
senior's apartments in uh Tobber my
[1:33:52]
uh yes the residents on the west side
have been reinstated in uh but I've been
[1:34:00]
questioned uh they haven't seen anybody
working there
[1:34:05]
since that when
how will I
[1:34:10]
uh when are they uh going to be allowing
the uh the residents in the east side of
[1:34:16]
the building uh to uh move back in? Do
you have any ideas on that or
[1:34:26]
we do not have a phone date? Um we do
expect them to be in however before
[1:34:33]
Christmas. Um but we will direct your
questions to Bruce County. Yes, that's
[1:34:39]
that's what I I I was hoping you'd say.
Thanks.
[1:34:43]
» All right. Thank you, Shi. And
[1:34:47]
» yeah, just uh so last council meeting
the uh the food bank uh do a
[1:34:52]
presentation uh requesting some
assistance on finding a new location. Uh
[1:34:56]
just wondering when we're going to look
at that report again. Just it sound like
[1:35:00]
the request was kind of semi urgent or
some urgency to it.
[1:35:06]
So staff have reviewed uh current
locations within our current municipal
[1:35:12]
facilities. Unfortunately, we don't have
any spaces available at this time.
[1:35:17]
However, as per the report um regarding
purchasing of uh property for recreation
[1:35:24]
community purposes, I believe it might
be a good avenue for council to have
[1:35:28]
that discussion of what the next steps
are with that property.
[1:35:41]
just have a question regarding the
highspeed internet. I know people that
[1:35:45]
live in South Bruce and they've actually
been hooked up to new services and it
[1:35:50]
just appears that there doesn't seem to
be much action going on in North Bruce.
[1:35:54]
I just was curious as to the status.
We'll have to get back to you on a
[1:36:02]
current updated status. We do have it on
our website, but I know they haven't
[1:36:07]
actually updated the draft currently
right now.
[1:36:10]
» Thank you.
[1:36:14]
» Anyone else have other business?
If not,
[1:36:19]
we will move in to item 10 on the
agenda, which is closed session, and
[1:36:24]
that council move in closed meeting with
the CEO and clerk in attendance pursuant
[1:36:28]
to section 2392
of the municipal act 2001 as amendment
[1:36:33]
for the following reasons.
Personnel matters about identifiable
[1:36:38]
individual including municipal or local
board employees specifically related to
[1:36:42]
a personnel update.
Thank you for a second for that. Do and
[1:36:47]
smokey all favorite motion carated.