Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[3:52]
Is my mic on? There we go. Welcome to the Panama
City Commission for August 25th. We're going to
[3:57]
start out with an opening prayer with Reverend
Randy John, pastor of Heritage Bible Church,
[4:03]
followed by the Pledge of Allegiance led
by Commissioner Brian Granger. Please rise.
[4:10]
Good afternoon everyone. Let's pray. Actually, I
was just noticing that threem minute timer. It's
[4:14]
good thing my church doesn't have one of those
when I'm preaching. Yeah, making me nervous.
[4:19]
All right, let's pray. Father, we come before
you with grateful hearts for all that you have
[4:25]
done. And Lord, we are reminded of your words
in Psalm 117:E2 that great is your love for us
[4:33]
and the faithfulness of the Lord endures forever.
Lord, we consider those principles as we pray this
[4:38]
this afternoon for the uh for the commission for
the things that need to happen. We recognize that
[4:44]
government government was intended by you that it
was ordained by you and that its purpose was to
[4:50]
administer justice and order and protection.
And so I pray for your wisdom this morning
[4:56]
uh this afternoon Lord for each and every person
here for the decisions that need to be made for
[5:03]
the things that need to be considered. Uh Lord
we just ask that you would grant your wisdom and
[5:10]
your favor in all things and that all of this
would recog would ultimately recognize your
[5:16]
sovereignty over the affairs of humankind. And we
are reminded, Lord, that wisdom comes from you.
[5:25]
And so we ask for that in Jesus' name. Amen.
Amen. Thank God. You'll join me in the pledge
[5:31]
of allegiance. I pledge algiance to the flag of
the United States of America and to the republic
[5:39]
for which it stands, one nation under God,
indivisible, with liberty and justice for all.
[5:52]
Please call the role. Mayor Branch present.
Commissioner Street here. Commissioner Hughes
[5:58]
here. Commissioner Lucas will not be joining
tonight. Commissioner Granger, present. Mayor, you
[6:04]
have a quorum. You've received the meeting minutes
from August 11th. Do I have a motion to approve?
[6:11]
Second. Any discussion? Please call the role.
Commissioner Street. Yes. Commissioner Hughes.
[6:15]
Yes. Commissioner Granger. Yes. Mayor Branch.
Yes. Motion passes four to zero. Any additions,
[6:22]
deletions, or modifications? Yes, sir. Staff has
a couple. Uh, so item six, Bravo, uh, the first
[6:28]
and only public hearing for a proposed gateway
overlay. Staff requested that be removed and
[6:33]
tabled until September 22nd. And then item 7A, the
second and final two public hearings uh regarding
[6:42]
uh zoning designation of heavy industrial as well
as item 10A regarding discussion of the city clerk
[6:48]
treasurer positions uh recommend that item uh
7A and 10A be uh stricken uh without a date to
[6:56]
return. Okay. So removal of 6B, 7A and 7 and 10
10 A 10. However, I want to clarify. Six Bravo has
[7:05]
the date certain to return September 22nd 10, but
only six Bravo. Okay. Six. Okay. What was the date
[7:13]
on that? Uh September 22nd meeting. Did you catch
all that? That was a lot. Let's go. All right.
[7:20]
I'll try again. 6B, 7, and 10. You correct. We're
moving 6B, 7 A, and 10 A. However, 6B has a date
[7:28]
certain to return of 9:22. The other two does
not. And you're strike. You want to strike the
[7:37]
which item was that? We're striking 6B and 7A and
10A and 10. 10 A, but 6B is going to be coming
[7:46]
back September 22nd. I will make a motion that we
move item 6B to September 22nd and that we strike
[7:54]
uh 7A and 10A from this meeting. Correct.
Second. Second. Discussion. Please call the RO.
[8:01]
Commissioner Street. Yes. Commissioner Hughes,
yes. Commissioner Granger, yes. Mayor Branch,
[8:06]
yes. Motion passes 4 to zero. All right. Uh,
registration for the 2026 Youth Basketball League
[8:15]
has been extended through August 31st. Practices
begin in early September and games start later in
[8:21]
the month. So, now is a great time to sign up.
Scholarships are still available. For details,
[8:26]
please visit the front desk at the MLK Junior
Rec Center. You can register by scanning the
[8:31]
QR code on the screen or by visiting the MLK
Junior Rec Center page at panama city.gov.
[8:38]
The 2026 Panama City Christmas Parade
will be held Saturday, December 5th,
[8:42]
at 6:00 p.m. in downtown Panama City, featuring
this year's theme, Christmas Movies. Registration
[8:49]
to participate in the parade opens September
1st, next Tuesday. Those interested in joining
[8:54]
the parade can visit panalcity.gov gov for
registration details, the application link,
[8:59]
and more. All city offices will be closed in
observance of Labor Day on Monday, September
[9:05]
7th. Normal garbage collection, the blue cans,
will continue that day, and then regular office
[9:10]
operations for the city, will resume on Tuesday,
September 8th. Due to the Labor Day holiday,
[9:16]
the September town hall and Monday morning
with the manager dates will be rescheduled.
[9:21]
The town hall, typically held the first Saturday
of the month, will take place now on Saturday,
[9:26]
September 12th. Monday morning with the manager,
normally held on the first Monday of the month,
[9:30]
will be moved to Monday, September 14th. All times
and locations remain unchanged. Budget hearings
[9:37]
for fiscal year 2027 will be held on September 8th
and September 22nd, 2026 at 5:01 p.m. uh central
[9:46]
time here at the Bay County Government Center.
Residents are encouraged to provide feedback and
[9:51]
may attend in person or watch the live stream
online on our website. On September 11th, 2026
[9:59]
at 8:30 a.m., the city of Panama City will host a
solemn 25th anniversary 911 memorial ceremony at
[10:06]
the Panama City Marina. Held in partnership with
Bay County, the Bay County Sheriff's Office, and
[10:11]
Tendle Air Force Base. Their ceremony will honor
the nearly 3,000 lives lost on September 11th,
[10:17]
2001, along with ceremonial tributes, including
a presentation of colors, a moment of silence,
[10:24]
bell tolling, and a 21 gun salute. We invite
you to join us as we come together to remember,
[10:30]
to honor, and to reflect. Business tax
receipt renewals are now open for all
[10:36]
businesses operating within the city of Panama
City, including storefronts, homebased businesses,
[10:41]
food trucks, and short-term rentals. Renewals are
due by September 30th to avoid any late penalties
[10:46]
and potential code compliance action.
Renewal notices are mailed each summer,
[10:51]
and businesses are encouraged to renew early. For
more information or to renew, visit the business
[10:57]
services page at panalcity.gov gov or contact
the business services division at 850691-4603.
[11:07]
Panama City voters will have the opportunity
to consider three proposed charter amendments
[11:12]
during the November 3rd, 2026 general
election. The proposed amendments address
[11:16]
the city's government structure and elections,
the administrative and operational provisions,
[11:22]
and updates to modernize the city charter and to
maintain compliance with applicable state laws.
[11:28]
We have provided information and reference
materials on our website at panalcity.gov to
[11:33]
help voters review the proposed changes and
understand the questions that were appeal
[11:38]
appear on the ballot. All right. Uh, moving
into public hearings, mayor, commissioners,
[11:45]
item 6A is the first and only public hearing on
the approval of the proposed developer agreement
[11:51]
with Zachary Seymour for a property located at 101
East 7th Street with partial ID 200075-0000-00.
[12:02]
as background information. Uh, enclosing
your packet is the proposed developers
[12:06]
agreement which outlines the terms between Zachary
Seymour, the developer, the city of Panama City,
[12:12]
Florida, and the city of Panama City's Community
Redevelopment Agency regarding the purchase and
[12:17]
renovation of the historic property at 101 East
7th Street in Panama City, known to locals as the
[12:24]
Panama City Grammar School. The developer intends
to purchase and redevelop the historic Panama
[12:29]
City Grammar School property, which has been in
disrepair since Hurricane Michael, and transform
[12:34]
it into apartments and town homes to increase
the tax base and to preserve its historic value.
[12:40]
The agreement requires that after closing,
the developer must promptly repair critical
[12:45]
elements of the historic building such
as the roof, the windows and doors,
[12:50]
bringing the property into compliance with
city codes and the code enforcement order
[12:56]
and requiring completion of these mitigation
efforts within one year of closing or the
[13:00]
issuance of the permits, whichever is later.
A key provision of the agreement is to help
[13:06]
provide financial assistance to encourage the
development. According to resolution 2020623.3,
[13:14]
specifically section 32, settlement of leans
on page 22 of the policy and procedures for
[13:20]
code enforcement. The city manager has the
authority to settle a lean if it is in the
[13:25]
best interest of the city to help a respondent
of a code enforcement order sell the property
[13:30]
to another responsible purchaser or to promote
the economy in general. The agreement provides
[13:36]
that the city manager will wave the current
incurred in fines totaling approximately $374,750
[13:44]
and0 in exchange for a promisary note that will
be forgiven after the developer complies with
[13:50]
the agreement. Without this financial assistance,
it is unlikely that the developer could proceed
[13:55]
with the project. The agreement further allows
a developer to apply for any CRA or other grants
[14:00]
available and promises an award of $100,000 under
the current CRA grant programs. Note that this
[14:07]
agreement will have to be approved by the CRA
board. The following documents are enclosed in
[14:13]
your agenda packet. The developer agreement, the
location map, the proposed conceptual schematics
[14:18]
of the future project, and the promisary note.
Uh staff recommendation through the director of
[14:24]
development services that the city commission
conduct the first and only public hearing and
[14:28]
approve the agreement. Mr. Mayor, this is a public
hearing. If you wish to speak about item 6A,
[14:34]
please come forward. Anyone want to speak
about item 6A? Seeing none, I'm opposing public
[14:41]
comments. I will entertain a motion. Um motion
to approve uh with the caveat that if the work
[14:48]
is not complete within one year comes back to the
commission for discussion. I'll second just so we
[14:55]
can talk. Okay. Discussion. Let's go first. You'll
have it. Well, now I thought we made some changes
[15:04]
to what was read and on what Jonathan read. We
changed the timeline to a year without the on the
[15:14]
on the permits being initiated. There's a a way
when you got to issue that, right? Change that.
[15:22]
What what we talked Let me give some background
for the commission. Okay. Is that okay? Yes,
[15:27]
please. So, Commissioner Hughes uh did review
it, had some comments, some questions. I reached
[15:34]
out to uh um Dee Rowan, the attorney for Zachary
Seymour, and uh we discussed those. Would you like
[15:43]
me to talk about what you and I had talked about?
Okay. So, one comment that Commissioner Hughes had
[15:50]
was uh concerning the uh timeline and just making
sure it was clear who had to do what and that it
[15:58]
really was a year and it wasn't two years. Um so
as as always when you look at things we can reward
[16:06]
it and so we rewarded it in a way where first it
says that the project has to be completed within
[16:15]
um one year. Now in this agreement there was
specific provisions that said that um for example
[16:23]
when the site plan review was submitted the city
had 20 days to review it and u and some I think
[16:32]
there may have been one other day period u in that
also our code has provisions that once you have a
[16:39]
completed application the city is to review it and
uh and and process it. So, we added a section that
[16:48]
says that in the event um when I say we added it,
I added it after talking to Commissioner Hughes
[16:56]
and uh Ms. Rowan, in the event the developer files
a complete application is required above and and
[17:04]
if the city exceeds a time periods for the city's
reviews, then the mitigation period of one year
[17:12]
shall be extended by the numbers of number of days
in excess of the reviewed period. For example, if
[17:19]
the developer submits a completed application for
a site plan and the city takes 25 days to respond
[17:27]
rather than the 20, then the mitigation period is
extended by 5 days and that was acceptable to uh
[17:34]
Miss Rohan and I believe that that was consistent
with the comments that Commissioner Hughes had
[17:41]
made on that topic. Yes. So, so Michael, your
your department has to make sure they hit the
[17:46]
timelines and I wanted the city to have something
that they had to do because we're asking the buyer
[17:52]
to do something as well. So, we all need to
we all need to work together in that and it
[17:56]
keeps it moving along. So if if um taking uh the
comment or the the motion where it would come back
[18:05]
certainly it would come back if we're and and we
and that is part of the the emotion it would come
[18:11]
back if we're in violation or if the developer is
in violation. Would you like me to talk about the
[18:17]
um um other grant? We struck a sentence about
being able to apply for other grants. Okay.
[18:25]
There is a there was a sentence the developer
may also apply for any other applicable grants
[18:30]
available in the CRA district where the
development is located in CRA agrees that if
[18:35]
the criteria are met the developer shall receive
the maximum award available. So rather than say
[18:43]
um say that statement that the developer may
apply we uh Commissioner Hughes thought why not
[18:51]
just strike it because they can always apply. it
is kind of redundant and Miss Rowan said that that
[18:58]
would be acceptable to her client. Then we also
added uh that in that same section that further
[19:07]
the CRA agrees that the developer has applied
for a redevelopment site preparation grant. Now
[19:15]
that is attached that application will be attached
to your agenda for next week because it has been
[19:22]
submitted now and that hadn't been submitted a
week ago when this was prepared. So it says that
[19:28]
the developer has applied for redevelopment site
preparation grant and the CRA agrees that such
[19:36]
application meets the existing uh criteria for an
RSSP grant award and the developer shall receive
[19:46]
uh a minimum of $100,000 toward the development
provided. However, nothing herein shall obligate
[19:53]
the CRA or the city to award an amount greater
than $100,000 pursuant to the RSP grant. Now,
[20:01]
that sentence Commissioner Hughes did not did
did not u did not agree with and so that's why I
[20:09]
haven't passed anything out because we didn't have
anything to really but that was also uh talked
[20:15]
about. So those were the the anyway commissioner
those are the things that we talked about. I
[20:20]
just wanted to let you know we talked about Okay.
Thank you. And the applicant's representation has
[20:25]
approved those changes. They're cool with them.
They're you can the changes I think the question
[20:32]
is is the applicant okay with the changes that
are read? Well, DD is coming up. My my request
[20:38]
for just coming back in a year was just really
more for an update to ensure that we're following
[20:42]
the timeline. That's it. Cool. though. Yes, ma'am.
It doesn't change the contract. Good afternoon.
[20:48]
My name is Dee Row and I'm here on behalf of the
developer, Zach Seymour. Um the changes that Nevin
[20:55]
um and I discussed throughout the day. Yes. Uh
the one uh last change that I had um asked for a
[21:01]
little tweak on um was the way it was presented, I
don't know, an hour and a half, two hours ago, was
[21:06]
that the award shall be $100,000. And I did not
want to box my client into only getting a thous or
[21:14]
$100,000 because in his site um redevelopment site
application, the site preparation cost that he has
[21:23]
provided so far is $1.1 million. And the way that
your grant application reads is that the developer
[21:29]
can get I think that the award will generally
be $100,000 unless there's exceptional community
[21:35]
benefit. Now, you all still might stick to the
$100,000 depending on what's in the budget, but
[21:40]
based on the 20% of the site preparation cost, he
would be at $220,000. So, you guys can still stick
[21:47]
to the 100,000, but I didn't want to limit him to
an agreement that said shall. So, other than that,
[21:52]
I'm fine with all the changes. Um, we went back
and forth with several different iterations.
[21:57]
It's just that that one little piece. May versus
shall. No. Uh, let's let me read that one sentence
[22:04]
and see if um I know Commissioner Hughes disagreed
with the way or it didn't come out exactly what he
[22:11]
was thinking, but let me read it to you. The last
sentence that we're talking about here is that
[22:17]
the CRA agrees that the developer has applied for
redevelopment site preparation grant and the CRA
[22:23]
agrees that such application meets the existing
criteria for an RSCP grant award. So, so far
[22:31]
I think we're all in pretty much agreement. And
then it says, "And the developer shall receive,
[22:37]
and you requested, a minimum of $100,000 towards
the development." And then I added, "Provided,
[22:45]
however, nothing herein shall obligate the CRA or
the city to award an amount greater than $100,000
[22:53]
pursuant to the RSCP grant application. Is that
acceptable?" Yes, that's fine. I think the version
[23:00]
I saw before that it had the developer shall
receive $100,000 and that's when I had asked
[23:05]
for the minimum of $100,000 language. There's just
been some last minute revisions back and forth and
[23:11]
um I think that's why we weren't ready to present
it to the full commission today. Then we we also
[23:16]
I'm up for bringing it back. Bring it back.
Most there's three players in this. A buyer,
[23:23]
CRA, and the city. And what we're doing today
is trying to get something done and then it has
[23:29]
to go to the CRA. They're the final approval. I
don't It bothers me that we're everybody in here
[23:38]
that has something in the CRA can apply for this
brand. We're not going to spell out what they're
[23:43]
going to get. they're going to apply follow the
criteria, but for whatever reason, we're spelling
[23:48]
out what that what this applicant can receive
that's already in writing and approved. Um,
[23:55]
and it's what's going to happen is somebody reads
it, going to see $100,000. I'm going to see all
[24:00]
the other parts of it and then we're going to
line up. It ain't$100, I need 100. That's my
[24:05]
concern. If they all have properties that are
in this disrepair that are on Harrison Avenue,
[24:11]
then let them line up. Well, I get it. I get it.
But they he there's no special there's no special
[24:17]
uh favor given this guy. Everybody that has
property, not CRA, qualifies for this to make
[24:24]
an application under this demo grant. Y is that
that's correct? Right. Yes. I don't have any
[24:30]
objections with any other changes. Anyone else
have I don't I mean I I had two quick comments I
[24:37]
I hadn't gotten through. Um we know they're quick.
Oh, they'll be I'll try to You had a comment,
[24:44]
Commissioner Hughes, about impact fees, and so
this was changed. It says, "The city agrees to
[24:48]
work with the developer in good faith to
identify rebate or refund opportunities
[24:52]
for impact fees." And then it was added provided
such opportunity is available to other similar
[24:59]
projects. So no objection to that being treated
like everybody else. And then finally to to the
[25:05]
point that Commissioner Hughes had made that
people we need to make it clear or not that it's
[25:11]
not clear but make the point that all that there
are three parties and so we added a sentence at
[25:17]
the end that just says this agreement shall not
be effective unless until it is executed by all
[25:22]
parties CRA city commission and the applicant. So,
what I'm what I'm hearing is that we're basically
[25:29]
saying that yes, we're willing to do an award
of at least $100,000, but the applicant may may
[25:35]
put in and request more because of the math of the
program that we're running under the CRA. So, it's
[25:42]
not that this this applicant is receiving anything
outside of the the the current program that we're
[25:47]
we're running in the CRA um other than just a
a guarantee that they'll get at least $100,000.
[25:55]
I don't find that in I'm okay with that. I'm told
that it is um everybody has an opportunity and
[26:02]
we're just restating it or is it and making it a
guarantee? Well, as long as you meet the criteria,
[26:08]
it's a guarantee, right? Is that your motion?
You want It's not my motion. It's his motion.
[26:13]
You know, I I think the the only thing I'll add
is regardless of what the language says or isn't,
[26:18]
even if we were committing $100,000 to
save a historic building, I think that's
[26:22]
far exceeding the value of what this developer
is is committing to do over the next year. So,
[26:29]
I wish Mr. Seymour a fantastic um venture. Uh
we're rooting for you. The community is rooting
[26:36]
for you. Uh we're glad to have your investment
in the community. And so, um, just thank you for
[26:42]
picking up where somebody couldn't get it across
the finish line. So, um, appreciate you picking
[26:46]
up the ball. And let me say, I want this project
to happen. My job as long as all all of ours is
[26:52]
to protect the city. And what matters is what's
inside the four corners of that contract. And all
[26:57]
I'm trying to do is tighten it up so we don't have
any issues coming back. That's all my goal is,
[27:02]
not to kill it, not to make it go away. So, and he
hired a good lawyer to make sure that happens. So,
[27:07]
thank you. Yeah. New motion. Were you are you okay
with the changes that I highlighted? That's what
[27:15]
you presented originally. Plus, you wanted a year
update things that I spelled. Yeah. As long as to
[27:21]
me there were tweaks to what was here's and my
my hope is city is quick about getting permits,
[27:27]
developers quick about getting a roof and windows
and all those things on. And the next update a
[27:31]
year from now is just, hey, look how amazing it
looks and they're on to their project. That's
[27:36]
really what my hope is. Um, I just don't want
to get down a process that we're dealing with
[27:41]
something 8 years after the aftermath and
we're still trying to deal with it. So,
[27:46]
um, with that, I'll amend to include the
changes presented by the city attorney and,
[27:50]
uh, add the addition of just, um, bringing it
back to us a year from now for an update. Perfect.
[27:55]
I have a second. Second. Any discussion? I I'll
just add that, uh, Mr. Fuller and Mr. Massie have
[28:01]
already started doing some preliminary paperwork
in anticipation of the closing, so we are teed up
[28:06]
and ready to rock and roll. Love it. All right.
Yeah. The closing is scheduled for September 9th.
[28:10]
Hopefully, we can bring it in for a landing on
that date. This will be back next week. Yes. And
[28:16]
we'll be back before the CRA, you'll have the full
application that shows what the site plans are and
[28:21]
site cost and those those items. Please express to
um to your client that when they get their plans
[28:26]
and everything else together, we would love to be
a part of just announcing to the community what
[28:31]
exactly is happening with this historic property.
Sure. Absolutely. Thank you all. Thank you.
[28:36]
Please call the role. Commissioner Street, yes.
Commissioner Hughes, yes. Commissioner Granger,
[28:41]
yes. Mayor Branch, yes. Motion passes 4 to zero.
Item 6B was tabled to September 22nd, moving
[28:48]
into item 6 C, which is the first of two public
hearings on ordinance number 3314, an ordinance
[28:54]
amending ordinance 3305 regarding the Panama
City North Community Development District to
[28:59]
correct a scrier's error in the legal description.
background information. SE Land Development LLC on
[29:06]
behalf of the property owner petitioned the city
to establish a community development district or
[29:10]
a CDD pursuant to chapter 190 of Florida statutes.
Ordinance 3305 was adopted by the city commission
[29:16]
on June 9th of last year. Ordinance number 3314
is now proposed to correct a scrier's error in
[29:22]
the legal description. The CDD encompasses the
12,200 acre uh property owned by CBD Holdings LLC,
[29:30]
also known as the Shelton property. The subject
property has a future land use designation of
[29:35]
urban community in the city's comp plan and is
zoned planned unit development. The PUD specifies
[29:41]
approximately 1,800 residential dwelling units
and up to 450,000 square ft of non-residential
[29:47]
use or mixeduse space. A CDD is defined as a
special purpose local government that finances,
[29:54]
builds, and maintains infrastructure and
amenities in planned communities. Essentially,
[29:58]
a CDD is a special taxing district which allows a
developer to fund roads, water, sewer, storm water
[30:05]
management facilities, parks, and other community
amenities. A CDD is governed by the board of
[30:10]
supervisors elected by the land owners of the CDD.
The initial board is a developer/landowner and
[30:17]
eventually there is a turnover to the subsequent
home purchasers. A CDD has the authority to levy
[30:22]
non-advelor assessments that appear on property
tax bills separate from regular property taxes.
[30:29]
A CDD consists typically or sorry CDD cost rather
typically include debt service to repay bonds to
[30:36]
issue uh issued to fund initial infrastructure
construction and ongoing operations and
[30:41]
maintenance cost of the infrastructure. Following
items are enclosed in your agenda packet.
[30:45]
Ordinance 3314, the adopted map series, including
aerial, future land use, and zoning maps. Staff
[30:52]
recommendation through the director of development
services is that the city commission conduct the
[30:56]
first of two public hearings. Mr. Mayor, this
is a public hearing. If you wish to speak about
[31:00]
item 6C, please come forward. Anyone here to speak
about 6C? Seeing none, I closing public comments.
[31:09]
like to read. Ordinance 3314, an ordinance of
board of city commissioners of Panama City,
[31:17]
Florida, a mending ordinance number 3305
regarding the Panama City North Community
[31:22]
Development District to correct a scrib's error
in exhibit A there too, providing for severability
[31:28]
and providing for an effective date. Mr. Mayor,
item 7A from quazidual hearings was removed.
[31:33]
We're now into audience participation. Yeah, this
is audience participation. Um, this is where you
[31:37]
get to come forward and speak about any item
related to the agenda today with the exception
[31:42]
of 12A. I'm going to open up public comments just
for that particular agenda item. So, if you want
[31:48]
to come forward and talk about anything related
to the agenda except for 12A, please come forward
[31:53]
and just let us know what you're speaking about.
Maybe you may want to tell them what 12 is. Oh,
[31:57]
12A is the marina construction bids.
Yes, sir. Come on down, Mr. Derek.
[32:11]
Hey, Derek Thomas, 1100 West 10th Street. Um
12D, the uh $445,000 for design of the Frankfurt
[32:22]
walkway. I wanted to find out if there's anything
going on under the ground that's uh would explain
[32:29]
why that's so so much. It's basically a straight
road, straight sidewalk next to a straight road.
[32:36]
425,000 seems like a lot. Is there any uh 10-in
water man going down at the same time underneath
[32:43]
there? Is there any changes going on underneath
where they're putting the multi-purpose walkway?
[32:52]
Is that the final question? That that question
is for the design of it is the part of the design
[32:59]
designing putting in plumbing underneath the the
walkway. Yeah. We'll answer all the questions once
[33:04]
you're done. Is that the final is that your final
question? Well, okay. Did you put it down? The
[33:10]
uh the and then the uh the wet slips 11a the uh
they're going to put up $5 million. I think that's
[33:20]
great to get it kickarted. Um, but they're going
to take that and and they're paying up in advance
[33:26]
their land fees, their rent, right? And then last
year their rent was like $11,000. So how much is
[33:34]
So that's what I mean. Is it going to be also
their their taxes, the the amount that they pay
[33:38]
in in property taxes? Is it going to be the amount
they pay in in merchant fees? All of their any
[33:46]
money that they make at all down there. All of it
paid up to get to that. that item but we're taking
[33:52]
your questions and we got them. Okay. Well, that
is that if you understand what my question is,
[33:56]
where's the where's the money coming to over
time to come up with that with that 5 million?
[34:02]
And if at the end of 50 years they haven't used up
their 5 million yet, do they get a refund for it?
[34:09]
Because the uh it seems like that's uh that's a
lot of money and I'm really grateful that they're
[34:18]
putting that up. But what exactly are they paying
and moving forward? What are they designing into
[34:25]
it with the the plumbing? And if you're going
to open that up later for public comment, I'll
[34:29]
I'll be happy to hear that. Um, also 9F, I've had
our construction. They did the the metal roof on
[34:36]
my house and I was not at all happy with the job
that they did. So, if you look at the particular
[34:43]
materials that they use and make sure you don't
use the cheapest screws that they sell and stuff,
[34:47]
that'd be great for all Thank you. Anyone else
want to come forward and speak today? Yes,
[34:52]
ma'am. Come on down. Let's make sure we have those
questions to it so we get answered. Mr. Mayor,
[34:59]
uh Patty, Sunday 11:15. If I make a comment now,
can I still come back for 12A? Oh, yeah. Okay.
[35:06]
Thank you. So, my comment on this one is for the
proposed budget. Um I still am wondering about
[35:12]
the long-term debt and the detail is what of what
is comprised in that. Hi. Um, and wanting to know
[35:22]
and understand that as part of the proposed budget
and what the interest payment will be and what we
[35:28]
spend it on helps me as a taxpayer think clearly
or maybe more clearly or understand the need
[35:36]
for item 12A because to me they're both related,
right? If we're looking for creative things. So,
[35:43]
I think this is the third time that I've asked
and it probably takes a little while for what is
[35:48]
the detail of the long-term debt and what
did we spend it on. Thank you. Thank you.
[35:52]
Anyone else want to speak today? Yes, ma'am.
Come on down. Good afternoon. Good afternoon.
[36:05]
Brenda Lewis Williams, 2748 Drive, 32401.
I I have a 9E and 9F. 9D is included,
[36:14]
but it's not clear even on the agenda that was
sent out that we're permitting. Somebody went
[36:20]
back and read the city ordinances. I guess you all
got tired of hearing me talk about change orders,
[36:25]
but is this 10% that is being permitted? Should a
change order be uh needed? And the wording in the
[36:36]
um ordinance is cumulative. So is this they can
only ask for 10% or they can they get the 10%
[36:44]
and come back to the to the uh commission for
additional monies if the 10% doesn't satisfy.
[36:50]
And that was on which item pardon which
item was that? 9E and 9F 9. Okay. Gotcha.
[36:58]
the city the city the ordinance the city ordinance
does allow for the city manager to automatically
[37:05]
do 10% if necessary and the word cumulative means
once you get there that's all it is but can they
[37:14]
come back and ask for additional funds once
they get that 10%. Still doing change orders.
[37:20]
Yes ma'am. Anyone else want to speak today relate
to anything to on the agenda on the agenda except
[37:27]
of 12A? Yes, sir. Good afternoon. My name is
Will Owen, 6701 Yach Club Drive in Callaway. Um,
[37:36]
this was referring to 11 uh for you uh Mr.
Zimmerman. It's not so much a question,
[37:45]
it's a comment, so I don't know if that's um
what we're doing here. It's my first time doing
[37:50]
this. So, I'll read from my notes here. Um,
mayor, commissioners, and fellow residents of
[37:54]
Panama City, my name is Will Owen. I'm a local
business owner and the organizer of Jetet,
[37:59]
the world's largest jetbo gathering. Jetet
is an annual event hosted near the marina at
[38:04]
Hotel Indigo. Every year, Jetet brings nearly $1
million in direct economic impact to Bay County.
[38:09]
For nearly eight years since Hurricane Michael,
the marina has sat largely unusable. And that
[38:14]
isn't just an eyesore. It represents millions of
dollars in lost tax revenue, suppressed growth,
[38:19]
and missed opportunities for downtown Panama City.
The mayor raised fair questions in his comments
[38:23]
on Facebook the other day uh about city gains,
losses, and gives what we give up in financing
[38:28]
discussions. I'm here today to provide perspective
from the front line on what our citizens and local
[38:33]
businesses gain when we finally get boats back
in the water. Every year, the number one point
[38:38]
of friction for my guests during Jetet uh is the
lack of inwater boat parking and an easy launch
[38:44]
and recovery access for the boats. If this marina
is restored with ample transient slips, overnight
[38:49]
docking, and efficient ramp capacity, events like
mine can easily double the economic footprint,
[38:55]
which is again, it's about a million dollars a
year. More importantly, Bay County is full of
[38:58]
boers who are looking for places to take their
boats. And right now, there's no place in our
[39:03]
county where someone can dock, step off the pier,
and immediately walk to local restaurants, shops,
[39:08]
lifestyle events, hotels. Boers are in a fluent
demographic, and when they tie up at a marina,
[39:13]
they don't just buy fuel. They eat,
they shop, they stay in local hotels,
[39:17]
and they keep downtown businesses thriving year
round. Regardless of who's behind the development,
[39:22]
good development is good for everyone. We're
fortunate to have exceptional developers like St.
[39:27]
Joe, who care about creating communities that are
thoughtfully planned, sustainable, and ultimately
[39:32]
make the area a better place to live, work, and
play. I think that is what sets St. Joe apart from
[39:36]
other developers. They genuinely care about the
long-term success of communities they build and
[39:41]
the quality of life they create for the people who
call them home. I know the leadership at St. Joe.
[39:47]
I've stayed in their hotels. I've eaten in their
restaurants. I've swam in their pools. And I can
[39:51]
tell you that everything St. Joe does is done with
excellence. their staff, the planning and design,
[39:55]
and the execution and management is worldclass.
I believe we are fortunate to have such a
[40:00]
world-class organization offering to help shape
the future of downtown Panama City, especially
[40:04]
with this loan. Uh I believe we have a great
opportunity before us that is going to outlast all
[40:09]
of us. As residents of Panama City, Florida, we
enjoy something that only 94% of other US cities
[40:14]
do not. We are blessed with the to be situated on
navigable coastal waters and not just any waters,
[40:20]
the most beautiful in the whole world. I believe
we should lean into this uniqueness. I believe
[40:24]
we should invite everyone to come see the beauty
that we can at times take for granted. Let's work
[40:29]
with St. Joe to get this project moving. And when
we join forces to bring this marina back to life,
[40:34]
downtown Panama City won't just recover, it will
thrive for generations to come. Thank you. Yes,
[40:39]
sir. Thank you. We love Jetboat. I actually
had a friend come all the way from South
[40:43]
Florida with his jet boats. We had one come from
Washington State. Love it. I love it. Awesome.
[40:48]
Anyone else want to speak today related to
the agenda items? Yes, sir. Come on down.
[41:06]
George Kather 1702, excuse me, Westby tribe. I'd
like to um bring up a question on 9D for Baker
[41:14]
Court. Uh it was unclear to me as to where the
$181,000 is coming from. Uh is it coming from the
[41:21]
same type of fan financing that that generated the
original? So I was curious about that. Secondly,
[41:29]
um there was a note that said that originally
it was this was part of the West Beach Drive
[41:34]
sidewalk improvement project. Um there was a
uh in the design there was a proposal to go
[41:42]
down Farland with an 8 in water line and bury it
underneath uh West Beach Drive. This I understand
[41:50]
is going to be a storm sewer which was not
mentioned in the original West Beach Drive
[41:55]
plans and uh I understand it's going to need
to be uh have a have the beach drive cut up
[42:03]
uh to be laid down properly. I I gather
that requires an okay through the state
[42:10]
uh to district to break up their brand
new pay road. I don't know. That was
[42:15]
uh my question. Uh I also have a question on
12D uh which is the uh Frankfurt uh trail. Um,
[42:29]
does it it says here that this is a state
funded project, but I was wondering if this is
[42:34]
really a TPO project, uh, which also does also
would involve some federal funds as well. So,
[42:41]
thank you. Awesome. Anyone else want to
speak to that? Yes, sir. Come on down.
[42:56]
My name's Norvin Tibido, 206 North MacArthur
Avenue. First of all, we've had three ways to pay
[43:04]
for the city of Marina to get rebuilt. We had uh
back in 2019, right after the hurricane year after
[43:11]
the hurricane, we had an NRDA grant that would
redo the boat ramp and the pier that they were
[43:20]
talking about building out there. Then after the
hurricane, they uh we turned down that money. The
[43:29]
uh the mayor then he he he sent him a letter
telling that he did not want the money that
[43:33]
uh to put it somewhere else. But he also said that
we could take and and uh revisit that anytime we
[43:39]
wanted. But anyway, that was back then. Then
another way we had to rebuild the marina was
[43:45]
we had the FEMA money. We turned that down.
That would have built the slips 95%. We turned
[43:51]
it down. So here we are. Then we had $15 million
that we rescheduled to go to the Martin Theater,
[44:00]
which that's great. I love the Martin Theater.
I I'll never go there cuz it's going to cost too
[44:04]
much money for a ticket. But anyway, there was $15
million. Now we have $5 million that you talked
[44:10]
about at I think the last meeting. We was going to
put that in the 50 slips. Now we're talking again
[44:17]
about St. Joe going to give us $5 million with
uh with strings attached. That's what I don't
[44:23]
like is the strings that are attached. Uh they're
talking about the Uplands having say so under that
[44:29]
which in my opinion the Uplands ought not even
be uh built on. We don't need no hotel there. We
[44:35]
don't need apartments up there. We could build
a nice green space, a nice little amphitheater
[44:40]
around there. Have nice parking for everybody
to go and enjoy. Y'all got to consider that a
[44:45]
lot of people in this town don't make a whole lot
of money. I think $37,000 is the mean income. So,
[44:52]
uh, when you I I think you need to go on with
your idea of of phases. Take the $5 million,
[45:00]
put it on the on the slips for the 50, uh,
boat slips, and then see how that goes,
[45:05]
and then go into something else. I know y'all
are in a hurry to get this done, but well,
[45:09]
we was in a hurry to get it done, too. We could
have already had it done if we' used that FEMA
[45:12]
money to put it back Marina back like it was,
and then we could rebuild off of that. Uh,
[45:18]
but anyway, thank you. Yes, sir. Thank you.
Anyone else want to speak to that? Yes, sir.
[45:34]
9D. I just have a question. I wonder
why uh why did the city tennis main
[45:44]
tennis main line for 614 may probably
knew? Y'all should knew it by heart.
[45:50]
She knows. I just wonder why the city even messed
with it. That that water man on Baker's Court.
[45:59]
Never had a problem with it. I don't I don't
think that line is I don't think it's a cast iron.
[46:11]
It's two different two different lines. I I think
y'all should have went Beach Drive first. Did what
[46:20]
y'all should have done there with the problem
they have on Beach Drive itself. I just wonder
[46:26]
why y'all money could have been saved, not
just on Baker's Court. Uh y'all had talked
[46:35]
and listened to somebody. Money could have been
saved in this whole city. Y'all got brand new
[46:40]
water lines already in this city. Not nobody
own it, but we're we're paying paying money
[46:47]
on something that we already have. Thank you.
Anyone else want to speak tonight? Seeing none,
[46:56]
I'm closing public comments. And before we approve
the consent agenda, Johnson, there was a couple
[47:01]
questions I want to get answered. Miss Lams had
a question on 9E and 9 F about change orders and
[47:06]
10% cumulative stuff. Yeah. So referencing 9E
for the uh invitation to bid for Project Storm
[47:13]
Group I to Marshall Brothers. Uh M Williams is
correct. That was an error by staff. I already
[47:18]
have the authority to go up to 100,000. Uh I think
they just did 5% instead of 10%. Which would be
[47:25]
120,000. A little bit over my approval, but uh
I'm fine. Just it doesn't there's no reason to
[47:31]
go to 122 or 120. I it's it's fine. But yes, that
was just an error. They did 5% instead of 10%.
[47:38]
And then uh in regards to let's see what else
I wrote notes on the other consent item 10D uh
[47:45]
funding mechanism fail which one I'm sorry I'm
going to pull 9F off. So question 9D 9 delta.
[47:53]
Yes. Okay. Yeah. So that will be uh that'll
have to come out of infrastructure cert. So,
[47:58]
um, the original Beach Drive, uh, sidewalk
proposal, we were going to create kind of like
[48:02]
an enhanced crosswalk right there at the very
west end of Beach Drive to safely get over and
[48:07]
then come up that east side of Frankfurt Avenue
and then create some parking right there. Um,
[48:12]
because that project's been delayed. Um, and now
we're rocking and rolling with uh, the Baker Court
[48:17]
project. Uh, we're pulling that uh, back in. It
is part of that project. Um, our goal was to you,
[48:23]
you know, hopefully utilize a grant, uh, from
the state to accomplish some of this. It needed
[48:28]
to be done anyway. Uh, and it would have been
part of the original project, you know, had we,
[48:32]
um, you know, uh, not even had the opportunity
for that grant. Um, and just as a reminder,
[48:37]
as a state revolving fund project, they don't,
it doesn't really cover any storm water unless
[48:42]
there is a direct conflict with a water or sewer
line. uh therefore uh it is not covered in the
[48:49]
bulk of the project which is covered by the state
revolving fund. So that's why so there are some
[48:53]
some storm water upgrades more on the west end uh
of the property uh of the project rather as you
[48:59]
get to Frankfurt Avenue uh and then uh and again
it'll be some parking as well. So can you explain
[49:05]
the state revolving fund how the money comes out
and what we have to pay back? Yeah, so uh the
[49:10]
state revolving fund is actually a really great
program if you're not aware of it. It's uh from
[49:15]
the EPA administered through the state department
of environmental protection. Uh it's a it's a it's
[49:21]
a loan. Uh and what they do is they kind of handle
the the prepayment for us, which is awesome. Uh
[49:27]
and you know, in the case that it takes a little
bit longer for them to process anything. Uh we can
[49:32]
kind of fill in the gap uh with our utility fund,
but they've been really great at uh reimbursing
[49:36]
us, often less than 90 days. But the beauty of it
for the city of Panama City is it's a 0% loan. Uh
[49:44]
immediately upon the completion of the project,
the state forgives 25% of it. Uh and we've already
[49:50]
done probably 80 or $90 million worth of projects
and we haven't paid one penny yet. Uh the first
[49:57]
payment is deferred. I think we're looking at
uh next spring, early summer before the first
[50:02]
payment is due. So delayed first payment, 25%
reduction right off the top of the entire loan,
[50:09]
and then a 0% interest to pay that loan back. So
again, it's a it's a program from the EPA through
[50:14]
the Department of Environmental Protection
at the state level in order to help smaller
[50:18]
and medium-sized cities rebuild both their water
uh and sewer lines uh and repair any roads that
[50:24]
have to be redone in order to repair those water
and sewer lines. Awesome. Um moving on to consent
[50:31]
agenda. Yep. I'd like to pull item 9F off, Mr.
Mayor, Commissioners, please. Okay. I do have a
[50:36]
motion to accept everything except for 9F. Motion
to approve 9A through 9E. Second. Any discussion?
[50:44]
Please call the RO. Commissioner Street. Yes.
Commissioner Hughes, yes. Commissioner Granger,
[50:49]
yes. Mayor Branch, yes. Motion passes 4 to
zero. Item 9F is consideration of approval for
[50:56]
award of bid PC26-023 for the Trudedale Clubhouse
exterior renovations in the amount of $498,79747
[51:05]
to Arc Construction of Northwest Florida LLC. an
approval to enter into the attached contract and
[51:11]
authorize the city manager to sign any
and all documents necessary to complete
[51:14]
the contract and the project and approval of a
10% project budget contingency of $49,879.75.
[51:23]
as background information and ITB or invitation
to bid was advertised by the city on June 8th of
[51:29]
this year to secure competitive bids for the
CDBGDR which is community development block
[51:35]
grant disaster recovery funded through the
department of housing and urban development
[51:39]
which is called locally the TREL clubhouse
exterior renovations. Five bids were received
[51:45]
uh by city staff on July 31st of 2026. The lowest
responsive bid was submitted by R Construction of
[51:51]
Northwest Florida LLC in the amount of $498,797
and47. This project includes but is not limited
[51:59]
to exterior facade improvements, additions
of outdoor gathering spaces to the southern
[52:04]
and western sides of the building, HVAC additions,
and limited electrical additions and improvements.
[52:10]
The following documents are enclosed with
this agenda item. the tabulation of bids,
[52:15]
proposed car uh contract with Art
Construction of Northwest Florida LLC,
[52:19]
and then a letter of recommendation
from Florida Architects Incorporated,
[52:23]
uh the designer of this project. Staff recommends
awarding invitation to bid PC26 Desi Route 23
[52:29]
to Arc Construction of Northwest Florida LLC and
executing a contract in the amount of $498,79747
[52:38]
and approval of a 10% contingency in the amount of
[52:40]
$49,879.75 for a total budgeted
project cost of $548,67722.
[52:50]
Mr. Mr. Mayor, commissioners, the
reason I pulled this item off consent
[52:53]
uh is I do want to notify both the public
and this board that there will be a contract
[52:57]
revision that was agreed to uh by city staff
and the contractor and that is the substantial
[53:03]
completion date will be Jan January 31st of
2027. So substantial completion they have
[53:10]
committed to January 31st of 2027. So with
that u Mr. Mayor would uh recommend approval
[53:17]
um uh by the commission. Motion to approve
of those changes. Second. Any discussion? No.
[53:24]
Excited to see this project move forward. This
is a big deal. Love it. Huge. I just want to say
[53:29]
thank you to the contractor for committing
to uh to wrap up no later than January
[53:33]
31st. Please call. Commissioner Street. Yes.
Commissioner Hughes has stepped out. There he is.
[53:45]
Uh Commissioner Granger.
[53:49]
How does that work? I don't I believe
Commissioner Hughes. Commissioner Hughes.
[53:58]
Yes. Commissioner Granger. Okay. Yes. Mayor
Branch. Yes. Motion passes four to zero.
[54:08]
All right. Um moving into item 11 A is the
consideration of alternative financing option for
[54:14]
the construction of the wet slips at the downtown
Panama City Marina. As background information,
[54:18]
the city of Panama City solicited bids for the
construction of the first 50 wet slips for the
[54:23]
downtown marine on April 13th of this year. On
June 24th of 2026, 14 bids were received. Approval
[54:30]
to award this contract is covered later in this
agenda on item 12A under city manager section
[54:35]
uh here this evening. Truest Bank has already
approved the city using a portion of its existing
[54:40]
hurricane loan, originally $150 million, to
initially fund the construction of phase 1,
[54:45]
which represents the first 50 wet slips. After
several discussions with Joe PCOZ or JOPC,
[54:51]
this agenda item offers an alternative funding
option for the commission to consider. The city
[54:56]
and JOPC entered into a ground lease dated August
25th of 2020 for a portion of the marina property
[55:03]
and JOPC constructed and is presently operating a
hotel and restaurant on the lease property. As an
[55:09]
obligation of the ground lease, JOPC is presently
paying participation rent to the city based on a
[55:15]
percentage of gross revenues generated by Hotel
Indigo and Harrison's Restaurant. This is section
[55:20]
um 2.4 4 titled rent and the ground lease
contained in the attachment C in your packet
[55:25]
this evening. JOPC again has offered to prepay
its participation rent in an amount of up to
[55:30]
$5 million to fund construction cost associated
with phase 1 wet slips the first 50 slips. If
[55:37]
this offer is accepted, the city will receive and
approve invoices from the wet slips contractor.
[55:42]
JOPC who will pay the invoice amounts to the
city. The amounts paid by JOPC are considered
[55:48]
prepaid participation rent and the total paid
uh will be uh accounted for in the prepaid
[55:54]
participation rent agreement. The balance in
the prepaid participation rent account will be
[55:59]
reduced by the participation rent payments when
due under the ground lease. When the prepaid
[56:03]
participation rent accounts balance is zero, then
JOPC will resume the participation rent payments
[56:09]
to the city. As part of this agreement, the city
agrees to provide at its expense the electricity,
[56:15]
the water, and sewer services needed to support
phase 1 wet slips and to pursue development of the
[56:20]
T do Upland's area to further support the marina's
operations. The estimated cost for this upland
[56:26]
work is $3.179 million as addressed in attachment
D to agenda item 12A this evening. The Upland work
[56:33]
is planned to be funded by the line of credit
provided by Truis Bank as previously described.
[56:39]
staff this evening request direction from the
commission regarding the prepaid participation
[56:43]
rent agreement as outlined in the attached and
I'll turn it over to Mr. Zimmerman at this time.
[56:48]
Thank you. Uh just a couple of points. I won't go
over things that have already been talked about.
[56:55]
Uh but one point to make is that the commission
is already has the ability to fund uh the award
[57:01]
of a contract to construct the the wet slips.
This is an alternate or another way of doing
[57:09]
that which the St. Joe company through Joe PC has
offered and without and I believe the agenda item
[57:17]
request form covered uh well the participation
rent and how that works. There is an existing
[57:24]
provision in the agreement that talks about the
fact that um that if this is accepted by the city
[57:33]
the St. Joe company through Joe PC has indicated
obviously their interest and the city's interest
[57:41]
are aligned to see that a marina is constructed
well and operated well. So they would like to
[57:49]
uh enter into a management agreement for um that
would be for a period of 5 years. It would pay
[57:58]
um a fee of 3%. No. Yeah. 3% of the gross marina
revenues. Uh they would have a right of first
[58:09]
refusal to manage and operate the subsequent phase
that phase two of this would finish out the basin
[58:17]
next to hotel indigo and the restaurant. We did
have a we meeting staff talk to PFM and P uh this
[58:26]
afternoon. And PFM is the uh consultants that we
used and that you used when we were entertaining
[58:33]
a private uh public partner uh proposal for
the downtown marina and they reviewed marina
[58:41]
uh agreements throughout the state of Florida
when they came up with their uh projections of
[58:47]
of uh cost and revenues. They indic and they won.
They agreed that if the commission accepts this,
[58:55]
we have 60 days to enter into a management
agreement. If for some reason that we can't,
[59:02]
then uh we go back to ground zero. There's and
we just wouldn't be pursuing this funding option.
[59:10]
They would agree, PFM would agree to assist in
that effort. Also they indicated that 3% of the
[59:18]
gross marina revenues is actually somewhat less
than what they had been looking at when they made
[59:25]
revenue projections. So they felt it was very it
was a reasonable market rate uh proposal that Joe
[59:32]
PC had made. There are a lot of specifics to be
worked out in the management agreement itself. Um,
[59:40]
but it is um uh I I did a short review of it
there in my letter and it's also in the agreement,
[59:47]
but it says that the as far as that we would go
and work it out, but certain terms were listed
[59:55]
as that it would include. If we can't resolve it,
then we'd come back and and we wouldn't have this
[1:00:03]
particular agreement. But this is an agreement but
it also it has a condition as far as management
[1:00:11]
over the uh for over phase one. And Nevin can
you for the benefit of the public explain what
[1:00:19]
uplands means on this particular item. Well, there
is on this item uplands and this item uplands is
[1:00:29]
really pertaining to those things that would
support the use of the phase one. Phase one is
[1:00:36]
50 slips in the basin next to Harrison Restaurant
and Indigo Hotel. The total buildout for that
[1:00:44]
basin will be approximately a hundred slips. So,
it's the Uplands that are needed to support that.
[1:00:51]
And there's also an obligation to provide water
and sewer and power to the to support that. And
[1:00:59]
there would be an obligation to provide parking
uh things things that like that um that would
[1:01:07]
support that. There's no specificity exactly
what all that is. Um but that is what is the
[1:01:14]
uplands that it says it would would start working
toward that. So just some points of clarity. Uh
[1:01:21]
this is not a renegot. So the the hotel and the
restaurant pay property taxes because it's a 99
[1:01:26]
year lease. They pay bad taxes. They pay merchant
fees. And they pay us and what we're talking about
[1:01:30]
is their rent. And their rent, correct me if
I'm wrong, is about $100,000 a year because
[1:01:38]
it's 100,000. We're budgeting 100,000. We have
received more than that, but yes. So if they're
[1:01:46]
and so they would potentially be paying our
invoices from construction of the first 50 slips,
[1:01:51]
reimbursing us and if their hotel like let's say
in a year suddenly just starts doing terrible in
[1:01:57]
the restaurant that does we don't have looming
payments to it only gets that fine only gets paid
[1:02:02]
down as they are doing rent payments to us. So it
may take them 20 years, it may take them aundred
[1:02:08]
years depending on how well those businesses
do. And we're not carrying this looney debt on
[1:02:13]
our head because that's the situation we're
in. If we were to borrow this money, it is
[1:02:18]
$330,000 a year of just interest cost to the city
as opposed to just foregoing the $100,000 a year
[1:02:26]
of estimated rent. So we're already if you look
at the numbers, we either pay $330,000 a year
[1:02:32]
and for this loan or we forego the $100,000 in
rent. So to me it was a I I I like the deal and
[1:02:41]
uh the catch is they have to manage the marina
and and they're not when I say marina I mean the
[1:02:46]
boat slips. It doesn't change the dirt. That's not
talking about the boat ramp. We were talking about
[1:02:50]
managing the boat slips in a marina that would
be half built or fourth built. Right? It's not
[1:02:56]
a situation that a lot of people would say, "Oh
goody, let me go stand a team up and work on this
[1:03:01]
marina. this this these boat slips and manage
them while you're doing construction of other
[1:03:05]
parts of the marina while you're you know having
you know potentially gravel parking and putting
[1:03:11]
sidewalks is not no ship store no fuel you know
it's really a scrappy approach to getting this
[1:03:18]
we either stand our own team up internally to
manage the marina which I'm really not in favor
[1:03:23]
of or we go out and start soliciting bids for
managing this and what they've pitched to us is
[1:03:29]
an incredible deal from financing in my opinion
and the and the management. They are a known
[1:03:34]
entity that manages marinas professionally and
well and so I'm I'm very excited about this deal.
[1:03:42]
Yeah. So, I mean I I think from my perspective, I
appreciated the um the amortization schedule that
[1:03:48]
was provided to us in our packet. Um $5 million
of 5% interest is basically $400,000 a year and
[1:03:56]
over half of that um actually twothirds of it is
interest expense. And um that's over a 20-year
[1:04:03]
period. 20-year amortization comes out to 3.1
by the way. Yeah. Interest. It's basically like
[1:04:09]
$10,000 a slip, which that's going to be a year.
That's a lot for someone to operationally carry,
[1:04:15]
which has always been the tough part in financing
of these things. you've got to get the rest of it
[1:04:20]
built before it actually starts making any
kind of substantial revenue. So, you know,
[1:04:25]
I understand that some people, you know, have
their thoughts um on one way or the other, but the
[1:04:31]
reality is we have an option to not pay interest
and we have an option to pay interest. And so,
[1:04:37]
with those two together, I mean, I don't know how
you pick, you know, one different than that. to
[1:04:43]
the point on operations. Um I I I think we would
be hardressed and you know I've thought to myself,
[1:04:50]
do we go and try to give somebody an opportunity
on 50 slips with the financing and all that stuff?
[1:04:56]
But the reality is no one else has a building
down there and it's 5 years. It's forever. It's
[1:05:02]
5 years and and it's at the point where it's the
least profitable it absolutely can be. There is
[1:05:07]
no fueling station. There is no ship store. There
is no nothing else. So there's that. Yes, there's
[1:05:13]
not even an office there. So I I I mean, frankly,
I think where I'm at with it is like it's it's a
[1:05:20]
good step forward. Is this the end result and the
end thing that the whole marine is done and we've
[1:05:26]
got everything figured out? No, we don't. But
can we get 50 slips started? Yeah, we can with
[1:05:32]
this as it is today. So I would suggest that if
we exercise this option, we revise our budget to
[1:05:40]
remove that um revenue from our budget and um and
you know because it'll be going towards a a debt
[1:05:47]
payment essentially. No, sir. Is that Brandy? Is
that something that that we in my mind if we if
[1:05:58]
this we approve this the revenue has to come in
so we can give it back to them. When are we we're
[1:06:05]
giving that all up when we when we it's $100,000.
I'm talking about procedurally not not in effect.
[1:06:11]
We we'd have to work through because we would
then also have to budget to spend the money on
[1:06:17]
if the money is going to come through us and we're
going to cut the checks to the contractors. We'll
[1:06:21]
need to go come back and budget for that anyway.
I think regardless we're using the temporary line
[1:06:27]
of credit regardless to to do it because this
is a reimbursement scenario. Correct. Yeah. So
[1:06:34]
so we're still we're funding the construction.
The only issue is how does that funding get paid
[1:06:40]
back? And what is essentially a years before us is
no upands improvements. They're not asking for a
[1:06:46]
condo. They're not asking for anything else. Like
they're just saying, "Look, we'd like our rent
[1:06:52]
revenue to go dedicated towards paying that debt
so we're not saddled with long-term debt." So,
[1:06:57]
it's a win-win. And um what I'm getting at though
is when we make a statement like we don't want to
[1:07:04]
see this revenue in the budget um I think the the
revenue is still going to come as I understood
[1:07:11]
it as revenue is still going to come into us.
There's just going to be conduit push back out.
[1:07:15]
It's going to come into us as a reimbursement for
the project. We we'll have to work through that,
[1:07:21]
but it will it will not come in as
you know the revenue fund type stuff,
[1:07:26]
right? And if I understand, you still get your
property all the property taxes are still being
[1:07:30]
paid. This is just so there is a lot more revenue
that's associated with these two improvements on
[1:07:36]
Marina than even what we're discussing right now.
But the the point that I was making is right now
[1:07:42]
it's spoken for in the general fund budget and
this will not be in the general fund. Yeah.
[1:07:47]
Agreed. Agreed. It needs to be so it needs to
be removed from the general fund. It it will we
[1:07:52]
will remove it if this is passed. We'll remove
it for the tentative budget. There's currently
[1:07:57]
$100,000 in the in the proposed budget for fiscal
year 27, but we will need to come back with a
[1:08:03]
budget amendment to budget for the construction
um and how the reimbursement and all of that.
[1:08:13]
Okay. Um all right. So, all your comments,
great. I like them because one of the things
[1:08:22]
that I didn't think about up front, we're going
to take that $5 million that would come to us
[1:08:27]
all the time. Put it over here. We're creating a
gap. What are we paying that money? Where's that
[1:08:34]
money going? General fund, it sounds like.
What are we paying with that $100,000? So,
[1:08:40]
I asked Brandy, give me some information. And
that money is designated to parks and wreck.
[1:08:45]
Okay. A department that already is, you know,
sometimes on life support with people and all
[1:08:51]
that and they're doing the best they can. We
take 100 grand away from them essentially. How
[1:08:57]
do we fill that gap back up with what money?
That's my first question. It will be $100,000
[1:09:02]
less that we would put in reserves. Oh, what? The
money comes in the general fund. It goes to parks
[1:09:10]
and recck. It it doesn't get expensed out of the
revenue. Lost me on that one. Yeah. also because
[1:09:15]
you currently have a $1.2 million um budgetary
right you know okay why does it go why does it
[1:09:24]
go to reserves people don't parks and wreck it's
assigned for a parks and wreck expenditures but
[1:09:32]
we don't we don't I understand what you're
saying because reserves doesn't actually
[1:09:35]
exist it's just capital whenever the previous
commission approved the lease with St. Joe,
[1:09:41]
they approved it for the participation rent
to be go towards parks and wreck. I think
[1:09:46]
y'all are missing each other on Can we Can
we actually vote on the list and then move
[1:09:51]
on to that? 21 topics. Do we do we have a
can we get a motion on 11? Well, hold on.
[1:10:00]
So, St. Joe Company. Mhm. Um, contrary to what
the social media will tell you, they don't want
[1:10:08]
to take over Panama City, in my opinion, and they
don't want to own and operate the marina. They
[1:10:13]
want us to keep owning it. They just want us to
do what we're supposed to so people will be down
[1:10:18]
there so they can we can all have a good time down
there. Um, 0% interest. We already talked about
[1:10:27]
one uh we we work with and that's right the state
revolving fund. This is an opportunity to Norman
[1:10:35]
Timos. We we had a a grant that we didn't take. We
had a participation of a of a part of of P3 that
[1:10:43]
we didn't do and now we got money. Again, we can
do it our way with interest $3 million or we can
[1:10:51]
go the other route. To me, it's a no-brainer
business-wise because we get going today and
[1:10:58]
we have some obligations on our part. We've got
to make sure that the Upland utilities and the
[1:11:03]
Upland lights and and railing, all that's there.
That is not building vertically. That's building
[1:11:08]
horizontally. Just so we all understand, we've
got money for that. But somebody asked about,
[1:11:14]
"Oh, we should go ahead and just build. We should
have built a marina." That $5 million that we have
[1:11:20]
has to go through an EHP process. Could take 18
months. So if we waited and took that money, we'd
[1:11:25]
have to wait 18 months to build the slips, maybe.
So this gets us going now. We use that money, plan
[1:11:32]
for it, and y'all will know where it's going once
it's approved. We're going to tell them. So you're
[1:11:37]
going to know up front. There's no questions. To
me, that's the best transparency you can have. You
[1:11:42]
get a voice in it. We ask FEMA, they approve
it, and we go build it. That's pretty cool.
[1:11:48]
any other option right now cost you money or um
creates time. And I think we can all agree on one
[1:11:55]
thing. We don't want to spend as little money as
we have to, but move as fast as possible to get
[1:12:01]
the best product on what I believe is the best
piece of real estate in Northwest Florida. Okay.
[1:12:07]
And to your point, sir, a guy leaned up here one
day and said, "Lofers come by the marina every
[1:12:14]
day, and we're missing them. We're missing day
day knockers. We're missing overnighters because
[1:12:19]
we don't have anywhere for them to go and they
pay good money to come hang out in our city.
[1:12:24]
Let's open it up for them. If you don't like St.
Joe, it's okay that you don't like them. If you
[1:12:30]
don't like that I vote for, yes, that's okay, too.
But at the end of it, let's all stand on the dock
[1:12:36]
and shake hands and have a good time and watch the
sun go down. That's really what I'm after. So, I'm
[1:12:40]
with y'all. And we still have another 150 slips
to go. which but we'll have 50 to stand on the
[1:12:45]
dock floor. So, so if this this might help in the
conversation. This is just for the general public.
[1:12:50]
So, right now we're getting about $900 a month for
slips in St. Andrews. 50 slips. That's $540,000
[1:12:57]
a year. What essentially St. Joe has offered to
front the money in advance on their rent for a fee
[1:13:06]
uh to manage of point or z of 3%. So, basically,
it's $16,200. that St. Joe would make if they're
[1:13:15]
fully leased 100% of the time for the full year,
$16,000, $200, the city would make $500 and like
[1:13:25]
$34,000. Now, correct me if I'm wrong, Nevin,
but that money has to marina and come from the
[1:13:32]
boat slip rental. It'll go in the marina. Yeah.
And our large land lease requires that money
[1:13:37]
be spent on the marina. So if you're seeing if
you're seeing a lot of support that's up here,
[1:13:42]
it's because financially there's no other option
that is better than this option. So I like sure if
[1:13:50]
somebody else wants to take the next uh the next
30 days to throw something that's a better deal
[1:13:54]
than that that you're willing to make $16,200 on
50 slip rentals for 5 years while the city makes,
[1:14:02]
you know, 530,000. um and you're willing
to front the money to build all the slips
[1:14:09]
um and all of that, then sure, great. But I would
be hardressed to see if somebody's actually going
[1:14:16]
to be able to do something like that. I'd like
to see I'll make a motion that we accept the
[1:14:22]
St. Joe offer. And here's why. We have 60 days
to also maybe talk about I'm not a big fan of
[1:14:28]
the five years, but if that's what we not but
in the 60 days, we can negotiate with St. Joe.
[1:14:34]
And if it if we fall flat on our face, we can go
pay 5% and $3 million on FA in interest, but we
[1:14:41]
got a way to pay for it. That's the last option we
want. But we have a fallback. So if if we go ahead
[1:14:46]
and accept this option today, we got 60 days to
work on it. And I promise we'll keep you updated
[1:14:51]
on how that goes. So I make a motion accept that
offer with uh with a 60-day window to negotiate.
[1:14:58]
We restate the motion. Brand tell them about that.
He's motioning to accept the offer from St. Joe
[1:15:08]
for them to manage or not manage come back in 60
days with the management agreement but for them
[1:15:15]
to finance the 50 slips or sooner. We got up to 60
days. Yeah, but that's you know been just the the
[1:15:24]
motion is to accept the uh proposal prepayment of
participation rent agreement. In that agreement,
[1:15:30]
it allows 60 days to come back with a management
agreement. Yes. If for some reason that doesn't
[1:15:36]
work out, then the agreement you just approved
would terminate by all parties and we just
[1:15:44]
keep do something else. Thank you. Sounds
good. We have a motion. Do we have a second?
[1:15:53]
I'll second. Okay. Any discussion? I was about to
jump up and say somebody. No, any discussion. I I
[1:16:01]
would just like to add the statement was made
about um you know sta city staff not managing
[1:16:07]
the marina. I just want to state as a city manager
I agree with that. So I think it's important the
[1:16:11]
public see that both the elected officials and
the senior appointed officials concur with that.
[1:16:16]
I think we've already moved away from that. I
think trying to move back uh would be unfair
[1:16:20]
and and unwise at this point. I think I think it's
it's also should be said that the staff the staff
[1:16:25]
that we had that did manage awesome was awesome.
I think one of the problems is is that they worked
[1:16:30]
for the city which when when they needed to get a
uh was it a it was a bait vendor. Um like it took
[1:16:39]
them 6 months to get something that that any
business it would take maybe a week to get. I
[1:16:44]
would like to see a plan by staff to operate the
marina on $16,200 a year. Yeah. So, all right.
[1:16:54]
All right. Please call the role. Commissioner
Street. Yes. Commissioner Hughes. Yes.
[1:16:59]
Commissioner Granger. Yes. Mayor Branch?
Yes. Motion passes four to zero. Item 12A
[1:17:05]
is consideration of award of bid PC26-021
for the construction of 50 wet slips in
[1:17:11]
the western basin of the downtown Panama
City Marina. As background information,
[1:17:15]
the city through the city's purchasing division
uh solicited competitive bids for the construction
[1:17:21]
of the first 50 wet slips through a formal
solicitation bid PC26-021 on April 13th of
[1:17:27]
this year and open the bids received on June 24th
of 2026. These wet slips can be constructed under
[1:17:34]
an exemption from the formal permit requirement
documented in a letter from the Florida Department
[1:17:38]
of Environmental Protection or D exemption letter
dated April 17th of 2024. This exemption letter
[1:17:46]
is contained in your packet as attachment A
for your review. After receiving 14 bids, one
[1:17:50]
was determined to be nonresponsive as several key
required documents were not submitted as required
[1:17:56]
on the formal instructions to biders. The engineer
of record, Terrar Hall and Associates or THAA
[1:18:02]
determined that additional information was needed
from the lowest three biders to clarify that they
[1:18:07]
had sufficient experience and capacity to complete
the scope of work. The request for information
[1:18:13]
was sent out uh on July 24th of this year with
the responses requested back by July 29th. All
[1:18:19]
three contractors responded by the deadline.
Based on their review of this information,
[1:18:24]
THAA determined that two of the lowest three
bid packages did not satisfy the requirement,
[1:18:29]
as stated, a minimum of 5 years of experience
in marine construction to include consecutive
[1:18:36]
and active experience of work similar in scope,
leaving HGarters and Suns as the lowest responsive
[1:18:43]
bid received. Their bid amount was approximately
3% lower than THA's opinion of probable cost. For
[1:18:50]
details of their bid analysis, see attachment C
in this document representing a memo from THAA
[1:18:57]
on August 3rd of this year documenting their
analysis and resulting recommendation. Again,
[1:19:03]
14 bids were received. C bid tab in attachment
B in this packet for your review. HG Harter and
[1:19:10]
Suns was determined by THAA to be the lowest
conforming bid at a price of 3,616,3565.
[1:19:20]
This agenda item request is for the
approval to accept this bid and move
[1:19:24]
forward with the construction of the
first 50 wet slips in the western basin,
[1:19:28]
the basin closest to Hotel Indigo. Staff
recommendation on behalf of THAA Engineering
[1:19:35]
is that the commission approve bid PC26-021
to HG Harder Sons in the amount of 3,616,3565.
[1:19:46]
Mr. Mayor Commission, I just want to point out
that Mr. Todd Terrell and Mr. Jake Jawers of
[1:19:52]
uh THA are here with us this evening, the design
engineering firm uh and they are able to answer
[1:19:58]
any questions that you all may have. Mr.
Mayor. Yes. Uh, as mentioned previously,
[1:20:02]
I'm going to open up public comments. If
so, if you'd like to speak about item 12A,
[1:20:07]
please come forward. Anyone want to
speak about 12A? Yes, sir. Come on down.
[1:20:17]
And just to kind of frame the conversation is less
about should we build slips and more about which
[1:20:22]
bid do we choose? Just kind preferences. Yes, sir.
Yep. Okay. Um, well, I'm very glad that you're not
[1:20:30]
putting the small boats that you had planned up
there that belong next to the uh um boat ramps so
[1:20:39]
that you don't have people trying to launch their
boat and then having to yield every time a boat,
[1:20:43]
a large boat comes in or leaves because they would
be small boats next to the boat ramp and small
[1:20:49]
boats. I don't know if you're going to give that
up forever. I hope you do and stick with this. Um,
[1:20:55]
I'm glad to see that you're you're not at least
laying the plumbing for the apartments in the
[1:21:01]
upland area. Um, I don't know about the uh the
compensation though, the your uh document saying
[1:21:13]
um if if they're paying up for 308 million
property paying $100,000 in property tax. We're
[1:21:22]
only 12 for the construction of this place. Okay.
will um so it's $3 million for the construction
[1:21:33]
and the the St. Joe's loaning you 500 5 million
5 million and are you using 3.1 million to build
[1:21:43]
this? I'm not sure why you're getting more money
than you're actually using to to build the Good
[1:21:48]
question. Good question because in the uh
drawing they have vote lifts and they put
[1:21:55]
enough money in there if you when you wanted to
put a boat lift in they're going to pay for that.
[1:21:59]
So the 5 million is for the whole thing if you do
put in the uh the sea break that you're talking
[1:22:05]
about 50 slopes. What's Okay. So your 5 million
is for the actual lifts and the other ones that
[1:22:11]
I was asking just recently that would be better
on the other side next to the boat ramp. That 5
[1:22:16]
million is to include that portion. You just
haven't spent that. You're spending the 3.1
[1:22:20]
for just these. Is that what you're saying? We
have we're today we are discussing which bid
[1:22:25]
we are choosing. That's the only thing that's
the only thing this agenda item is related to
[1:22:30]
which construction. So which council thank
you. Would you want to clarify potentially?
[1:22:38]
Yes. Uh the uh prepayment of rent is for the
cost of the construction of the wet slips. So,
[1:22:48]
whatever is chosen, and it w it is an up
to $5 million uh number because the amount
[1:22:55]
was not known at the time that the draft was
done, but it's a uh it will be for the cost of
[1:23:02]
the construction of the wet slims. Gotcha.
Anyone else want to speak about item 12A?
[1:23:11]
Seeing none, I'll close public comments.
Do I uh have any motion? Do we want to go
[1:23:16]
bring up Mr. Yeah, I have questions
for THA. Come on down. Yes, sir.
[1:23:30]
Podium table. Yes, sir. Name and address
for the record. Yep. I'm Jake Joers,
[1:23:36]
engineer at Terrell Hall and Associates. Address
3625 Cottage Club Lane, Naples, Florida 34105.
[1:23:47]
All right. Um, we're going to kind of go into
this a little bit. Um, your evaluation used the
[1:23:54]
absence of marina utility experience, shore
power, portable water, that kind of stuff as
[1:24:01]
a key reason our marine was not qualified. But
in addendum three, the city was asked to define
[1:24:07]
these minimum standards for those exact systems
and the city chose not to do that. Um, so I'm
[1:24:14]
I'm just curious when I asked this question last
night. Why were those criteria because it seems
[1:24:19]
like those criteria were still used to score the
bid. Correct. Um well, I think it's worth pointing
[1:24:26]
out that they were disqualified for two reasons.
The first being the lack of 5 years of experience.
[1:24:33]
Um, it's August, so in order to have 5 years
marine construction experience, you would
[1:24:41]
have had to start something in August of 2021. The
earliest project they submitted was 2022. So, that
[1:24:51]
was one of two reasons they were disqualified.
To answer your question about utilities, um,
[1:24:58]
there's two big reasons that we considered the
utilities a big part of this. The first being that
[1:25:03]
if you read all of your bids, uh not just the low
three, all of them that were received the electric
[1:25:10]
and the fixed stocks are the two big ticket
items. Um with the electric, you potable water
[1:25:17]
and fire all the utilities totaling about 35 to
45% of the for all these. So, in our opinion, um,
[1:25:26]
with it being such a big component of the cost,
we thought it was important to evaluate when we're
[1:25:30]
looking at what projects are considered similar.
Um, we are aware that it is most likely those
[1:25:39]
utilities will be subbed out to a subcontractor.
However, if you read the invitation to bid,
[1:25:47]
um, there's a requirement. It says the city seeks
bids from qualified, experienced, licensed marine
[1:25:53]
contractors uh to provide all supervision, labor,
and equipment required for the construction of
[1:26:00]
the slips. Um their subcontractors, yes, I still
think it's important for them to be experienced
[1:26:06]
in the supervision of those subcontractors.
Um, we've seen projects go south due to poor
[1:26:14]
management of subs and uh, inability to coordinate
those utilities. So hopefully that answers your
[1:26:22]
question. That's why we thought that was an
important criteria. So next question for you
[1:26:27]
is you scored the Mexico Beach Canal project as
similar in scope for harders. The federal permit
[1:26:34]
for that project authorizes only sheet pile wall
at finger peers. None of the three utility systems
[1:26:39]
you cited against Art Marine. So, how did you
determine that that project was more similar than
[1:26:44]
Art Marine's larger structural marine projects?
So, based on the document that Harter provided
[1:26:50]
the city in response to the request for additional
projects, they stated that there was I don't have
[1:26:57]
the exact wording in front of me there. They
stated that there was infrastructure for power
[1:27:03]
distribution, power pedestals, and portable water
at each slip. Uh to answer your question about the
[1:27:08]
Army Corps permit, the Army Corps doesn't really
permit utilities. They look at inwater impacts
[1:27:14]
like piles and overwater shading. So I I wouldn't
expect to see the utilities in that document.
[1:27:22]
All right. Uh last question is your memorandum
still references a sewer pumpout station and
[1:27:29]
addendum seven removed that item from the scope
of PC26-021 was the evaluation performed against
[1:27:38]
the final contract documents after all the
addend Could you repeat the last part of
[1:27:46]
that? was the evaluation performed against all
of the final contracts after addenda 7 cuz it
[1:27:53]
removed the pumpout station. So that's
where it's kind of look I both of these
[1:27:59]
contractors are great. I mean we're going to
win if we select either one of them. So I'm
[1:28:03]
not I don't have a preference either way. But
what I have a problem with is that when things
[1:28:08]
show up after other agendas and we're holding
bids and contractors over millions of dollars,
[1:28:15]
that's where I I start to kind of question what's
going on here. So it was a pump pumpout station.
[1:28:24]
We removed that and then you referenced it. Um
where did we reference that? in your memorandum.
[1:28:37]
Okay. Yeah, we probably should have deleted
that out of the statement there. So,
[1:28:41]
is that used as a scoring criteria? Yeah.
Okay. Thank you. Yep. Any questions?
[1:28:52]
That was it. Any other pull on the other bids
act? Any other questions? Anyone else? No,
[1:28:58]
I mean I I've got a lot of respect for
all the bidders. Um, this was probably
[1:29:02]
the most bids that we've gotten on any
project, I think, since I've been here. So,
[1:29:06]
I was super excited to see how many people. Um,
at the end of the day, it's taxpayer money. And,
[1:29:12]
um, you know, if you got the qualified license,
the bank's willing to bond you. We've got a CI
[1:29:18]
that's going to be on the team to inspect the
work. I I don't know how we just go and just say,
[1:29:23]
"Hey, let's let's move up to higher biders." Um,
I respect the opinions of everybody that's given,
[1:29:30]
but at the end of the day, like we we put we put
contractors through the ringer when it comes to a
[1:29:35]
bidding process, trying to keep it level, open
playing field, and um, you know, I mean, the
[1:29:44]
bottom line is it's taxpayer dollars. We should
go with a little bit. I agree. Do we want to move
[1:29:52]
into a motion or we continue discussion? You want
to entertain a motion? So, Commissioner Hughes has
[1:29:56]
asked me to read just a couple of definitions
out of our purchasing manual if that's okay,
[1:30:00]
Mr. Mayor. Absolutely. So, um, definition of
a respondent is a person or entity who submits
[1:30:06]
an offer in response to a solicitation. Also be
referred to as a proposer, an offer, or a bidder.
[1:30:12]
A responsible respondent is an individual or
business which has submitted a bid, an offer,
[1:30:18]
a proposal, a quotation or response which as
determined by the city has the capability in all
[1:30:24]
respects to formally uh sorry to perform fully
the contract requirements and the experience,
[1:30:31]
integrity, reliability and capacity the
facilities, the equipment and credit which
[1:30:36]
give reasonable assurance of good faith and
performance. The city may also consider and
[1:30:41]
give weight to the respondents previous conduct
and performance under previous contracts with the
[1:30:46]
city and other agencies including but not limited
to delinquency and determine the quality of the
[1:30:52]
respondent's previous work. City staff may after
bid opening request additional information from
[1:30:58]
the respondent concerning his or her ability
to perform and the respondent may voluntarily
[1:31:03]
after opening provide additional or corrective
information concerning his or her responsibility
[1:31:09]
as a respondent. And then a responsive respondent
is an individual or business which has submitted
[1:31:16]
a bid, an offer, proposal, quotation or response
which as determined by the city conforms in all
[1:31:23]
material respects to the solicitation which may
include but is not limited to pricing, shity,
[1:31:30]
insurance, specifications of the goods or services
requested or any other matter unequivocally stated
[1:31:37]
in the invitation for bids as determined uh
as responsiveness. A lack of conformity in
[1:31:43]
these matters which is non-s substantive in
nature may be considered a technicality or
[1:31:49]
irregularity which may be waved by the city. The
purchasing division will notify any respondents
[1:31:55]
of any non-substantive informalities in their
response. The respondent will then have 24 hours
[1:32:00]
from the time of the notification to furnish their
requested information to the purchasing division.
[1:32:06]
If the opening is on a Friday, they will have
until Monday at 5:00 p.m. to reply. If no
[1:32:10]
response as requested is received within 24 hours
of the notification, the respondent will be then
[1:32:16]
deemed non-responsive. And a responsive bid is a
bid or a proposal which conforms in all material
[1:32:22]
respects to the competitive solicitation. I think
those are the relevant definitions. Mr. Mayor,
[1:32:28]
commissioners, thank you. Yes, sir. Do have a
question for you guys. y'all operated under those
[1:32:34]
definitions, those requirements. Okay. Yeah.
You'll have to come back to the microphone.
[1:32:42]
You have to say your name and
your address and give the record.
[1:32:47]
Like Mr. Henry, she just knows his name
where he lives. He comes here every time.
[1:32:51]
You want me to say it again? Yeah. Yeah.
Jake Joers, 3625 Cottage Club Lane, Naples,
[1:32:58]
Florida 34105. Right. So you use both of those
definitions. You disqualify them and and found
[1:33:05]
reasonable and non-reasonable. Correct. In
in all the notice. Correct. I mean again
[1:33:10]
we in the ITB it says they have to have 5
years. We didn't see that demonstrated. So
[1:33:16]
that's why we disqualified them. So yes. Were
there any um requests for information that
[1:33:23]
u changed any timelines any requirements? anything
that would have um made the disqualified first
[1:33:30]
and be qualified. I'm learning about these
things about so I'm asking questions just
[1:33:35]
I would have never thought about did did y'all
change any rules along the way or add anything
[1:33:40]
along the way in the in the men? So there was an
additional request where the city sent out to the
[1:33:48]
three lowest biders a request for additional
project experience. I believe the original bid
[1:33:55]
said within 5 years and that extended the
the timeline to 10 years. Good. Thank you.
[1:34:05]
I don't have any questions. So he said um my
concern is this. We want to now make a decision
[1:34:14]
about how to move forward with someone over money.
Not even is it the right person, wrong person? Is
[1:34:24]
it we need to make sure we're going to have a
class A project. We had a chance to do this and
[1:34:30]
it wouldn't cost us any money and we couldn't make
a decision then. I'm concerned that we're rushing
[1:34:36]
to a decision now because of um saving money. Not
taking away from Mr. Bowers at all. It's not his
[1:34:45]
fault that he comes in low. It's our fault that
we are having to work off of saving money. That's
[1:34:53]
that's where I'm getting caught in here because
are we going to do this entire project this way?
[1:34:58]
And it was going to be paid for 100% to Josh's
part. It was going to be paid for. I'm having to
[1:35:03]
break out on the last one we had and and it was
zero dollars for us. So that's my angst right
[1:35:10]
now. Sure. And maybe Mr. Mowers can um help that.
Well, I I think you said we're going to continue
[1:35:16]
forward with this and and I plan on continuing
forward choosing the lowest bid when the when
[1:35:20]
the contractor has proven themselves into their
bid and we have stop gaps of their bond and uh and
[1:35:28]
all the other things CI to ensure that they're in
plans to ensure that uh we're inspecting the work
[1:35:33]
that we are receiving what we've bidded for and I
believe staff is pretty confident that these bids
[1:35:38]
uh they can't go back and change their
mind on their price and they're locked in.
[1:35:42]
And so I would just ask like what situation are
we what are we saving ourselves from? What are
[1:35:48]
we avoiding? What what are we avoiding? Because
the last project, the last presentation was true
[1:35:54]
no cost with the exception of 300,000 ft in
the uplands being built. But take that aside,
[1:35:59]
what we're what we're talking about now is exactly
the same except we're it's we're we're zeroed out.
[1:36:05]
Never mind the upland side. That's the problem
I've got. What what is the situation that we are
[1:36:10]
worried that's going to happen if we choose the
lowest bid? It's not about the lowest bid. We're
[1:36:15]
making a decision based on we got a recommendation
to do one thing and I feel like that decisions are
[1:36:25]
are being made or being asked to be made based on
dollars, not on recommendations. So that's just a
[1:36:33]
concern that I have, you know, doesn't mean
I'm going to go yes or no on that. Yeah. Um,
[1:36:37]
I I don't have any other questions. I've been
very clear about my stance and I'm I'm ready to
[1:36:41]
move forward um with the lowest bid and um I don't
have any questions for any biders or engineers.
[1:36:47]
And I'd like to clarify a couple things. Sure.
Come on up. David Bowers, Art Marine. Uh the two
[1:36:56]
uh items that uh the evaluation team said we were
disqualified on the first one that we don't have
[1:37:03]
five years. That's not what the question was.
The question was supply three jobs within the
[1:37:10]
last 5 years. I could have put on the form three
jobs in 2026. That doesn't mean that we only have
[1:37:16]
3 months of business. Then they extended out
to 10. We didn't have to change it. We already
[1:37:21]
had our qualifications met. So when they're
evaluating our experience and I again if it
[1:37:27]
was only for 3 months, three jobs of like size in
marine construction, we provided that. We didn't
[1:37:34]
fail that evaluation. We passed that with flying
colors. We are the most responsive bidder. We are
[1:37:41]
the lowest bidder and we should be awarded this
job. The second item when they're talking about
[1:37:47]
uh the evaluation, uh unfortunately they they
went outside of that as well. Um the evaluation
[1:37:56]
used criteria that was never in the ITB. The
ITB asked for marine construction experience
[1:38:04]
during bidding. A bidder asked a city in writing
to define the qualification standard. That bit
[1:38:12]
that bidder named fire suppression, water systems,
and electrical. Addendum 3 had an opportunity to
[1:38:22]
add that. Addendum 3 did not. The city declined to
add them. The evaluation team used that. Anyway,
[1:38:33]
your purchasing manual manual of the city of
Panama City, section 14 says no criteria may
[1:38:42]
be used that is not in the solicitation. So,
where did we fail on the two items? Did we
[1:38:48]
have experience in five years? Yes. Did we meet
the evaluation? Yes. Any other questions for me?
[1:38:59]
No sir. I'm your lowest bidder. Yes,
[1:39:01]
sir. Thank you. I will entertain a motion.
I'd like to say something. Sure. Come on down.
[1:39:12]
Hey. Hey. Jacob Harters, HG Harters,
1615 Wahoo Lane, Panama City Beach.
[1:39:20]
So there's it's not up to me to uh talk about the
qualifications of Art Marine by any means, but I
[1:39:26]
would speak as to the city's position with the ITB
process, not knowing, you know, the ins and outs
[1:39:33]
of the purchasing manual. This obviously being
an ITB with an extensive qualification package
[1:39:40]
and reference package desired at bid time. In the
bids, I find it curious that the low bidder would
[1:39:47]
have just one named reference or qualification
for the three rather than various ones. Um,
[1:39:55]
I would perhaps ask questions about that. You
know, from the city's process side, it was deemed
[1:40:03]
as you received the bids and studied them to go
to a third party review. So, I'd ask the question,
[1:40:10]
you've had the third party review from a credible
source, outside source. Um, does the city dismiss
[1:40:16]
that and say that the folks that they hired that
their opinion is not credible, that the city has
[1:40:25]
more marina experience than a marina engineer?
Um, maybe, maybe not. I would just ask from the
[1:40:33]
ITV process, how did we really review everything?
Um, how are we accepting the third party engineers
[1:40:44]
opinion? Um, it sounds like, you know, perhaps
all of that is tenatively dismissed and I would be
[1:40:55]
curious if uh if that's what's happening. Mr. B,
could you come on up for me? Come on up. Yeah. I'd
[1:41:01]
like you to define uh you know this is different
than private business. This is a governmental bid
[1:41:07]
and unfortunately we from my understanding don't
have the option of just picking willy-nilly who
[1:41:12]
we think is the has the biggest cranes and the
biggest staff. What's our criteria? How do we
[1:41:18]
look at these bids and look at the lowest bid
to disqualify as as elected officials? Well,
[1:41:25]
we had a question that was similar to this last
evening to your virtual workshop. You just give
[1:41:29]
your title for the public. People might not
know who you are. And God's not the answer.
[1:41:35]
Mike Burke, uh, assistant city attorney, 221
Mackenzie Avenue, Panama City, Florida. Is that
[1:41:43]
right, Mr. Zimmerman? Okay, my three minutes
is up. I'm sorry. I'll come back later. Um,
[1:41:51]
so the question was asked last night. What
What are we Why are we here? This is an unusual
[1:41:55]
situation where you've had um something like this
come to you. Um, and the the way I described it to
[1:42:01]
you last night and the way I'll give it to you
again is um you are sitting in this isn't this
[1:42:07]
isn't a perfect analogy, but it's a good analogy.
You're sitting in uh almost a quasi judicial
[1:42:12]
capacity. You have been presented with um a set of
rules um by which we sent out, we being the city
[1:42:20]
sent out a request or an invitation for biders to
come back. Um those biders have come back. you've
[1:42:25]
had staff come and review that for you, make a
recommendation based on their rules and the way
[1:42:31]
they've seen it u based on the the timeline and
the criteria um that are before you and they've
[1:42:37]
made a recommendation. Now you're your job just
like you would in a zoning request or something
[1:42:42]
like that is to take the the facts and the the
rules and compare the two and determine what you
[1:42:48]
think to be um the basis for the determination.
um the evidence was collected, so to speak,
[1:42:55]
to put this back in sort of a judicial um
determination. The evidence was collected during a
[1:42:59]
certain amount of time period. Um that was um from
the invitation to bid until the bid was closed.
[1:43:05]
There was a provision um that allowed in the rules
that said if we've got some clarifications that
[1:43:10]
we need to make, we'll ask some additional
questions of folks. You heard that. That was
[1:43:15]
um Mr. Jawers gave that to you. And now it's
your determination to to it's your decision or
[1:43:21]
job to make the determine based on that what you
believe to to be the the the facts bear out for
[1:43:29]
the decision that you want to make. Um and so you
know you can have there there may be all kind of
[1:43:35]
different reasons of of why you individually think
this is to be a you know one's more acceptable
[1:43:41]
than the other. Um, but ultimately as a body you
come together and make that determination when
[1:43:47]
you make your motion and your second and and have
your vote. Does anyone have any questions for the
[1:43:52]
legal situation? So um we got a recommendation
and we go with a little bit. Is there a what is
[1:44:02]
afforded each party if they if we voted the other
way that they think we went with with harders can
[1:44:09]
or protest what can they what what can they do
again I mean that's that's the same there we
[1:44:15]
have rules regarding how you file a protest so yes
if someone doesn't like the decision that's made
[1:44:19]
here they have an opportunity to to appeal that
decision make a bid protest to you um no different
[1:44:25]
than again I'll use the zoning analogy one time
one more time for you you know if somebody didn't
[1:44:29]
what your zoning decision is. You turn them down
or something. They can go and appeal you for that
[1:44:35]
and have someone else make that determination.
Who's going to look at this record going to decide
[1:44:41]
what what you've talked about today based on the
rules and then determine whether or not based on
[1:44:46]
substantial competent evidence that means good
evidence that um that your decision um was the
[1:44:53]
right decision. and that is um you are given
great difference um as the legislative body to
[1:44:59]
make those decisions. Um so you're not going to
be um second guessed is is the way I would put
[1:45:05]
you wouldn't be second guessed unless there is a
really really good reason um to make that second
[1:45:10]
guess of you and that's because you violated
some some standard or rule or something along
[1:45:14]
those lines. So very good. Thank you. Any other
questions? Thank you. I will entertain a motion.
[1:45:26]
Motion to approve load bid um with also
instructions staff to hire outside CI
[1:45:31]
to oversee the process. Do I have a
second? I'll second that. Discussion.
[1:45:40]
Please call the role. Commissioner
Street. Yes. Commissioner Hughes.
[1:45:47]
Yes. Commissioner Granger. Yes. Mayor Branch.
Yes. Motion passes four to zero. Mayor and
[1:45:57]
commissioners. Uh item 12B uh is uh no no real
action is necessary. We just um wanted to put
[1:46:04]
the budget uh as drafted um and proposed um on the
agenda in advance of the September 8th uh first
[1:46:11]
reading just to see if there's any additional
questions um that that y'all may have um in
[1:46:17]
order to get clarity uh ahead of staff. is, you
know, we've already had five pre-budget workshops
[1:46:23]
uh with each and every one of you, but again,
just wanted to give another opportunity uh before
[1:46:28]
we got into the um the first official reading as
required by state law uh on September 8th uh for
[1:46:34]
uh for the FY2027 budget. Can we make sure we
get um Mrs. Sunday the long-term debt summary
[1:46:41]
kind of like a distrib this far? I'd love to go
distribute it. I I'm I'll get with her to clarify
[1:46:50]
what information she's wanting. Um well, if she
needs to clarify, I'll clarify what information I
[1:46:58]
would like. I'd like to just see where our current
debt is right now and what that would convert to
[1:47:03]
if it's long-term. Are you asking for a balance
of our 150? Yes. Okay. So, we paid off around 73.
[1:47:11]
you just whatever that balance is and what that
would look like in a long-term debt scenario in
[1:47:16]
any planned payments before it's paid off. You
told us we're going to pay off maybe another 20
[1:47:22]
or 30 million. I'd like to see that forecast out
because what's coming back is the bulkhead and
[1:47:28]
that 5 million for that one there. So that's got
to be included back in the future as well. That's
[1:47:32]
that's a great point. So that should include any
obligations that we have already committed to such
[1:47:38]
as projects that we have said and we've approved
budgetary expenditures but they may not have been
[1:47:43]
incurred yet the 23 like the 23 million that y'all
have approved. Is that what you're referring to?
[1:47:50]
Yeah. So a great example of St. Andrew's bulkhead
that that full project amount be reflected in
[1:47:56]
the debt um and the projected debt balance.
Same thing with anything that's on Martin.
[1:48:01]
Same thing with anything that's on any other
projects that we have ongoing and a potential
[1:48:06]
end date payment when that loan goes away. So if
it's a 30-year loan, is that possible? The terms
[1:48:13]
we're looking at doing a bond for the long term
um which would be long term. it would, you know,
[1:48:20]
probably be 30 years. Yeah, I'd love to see you
guys work with staff and this Sunday to come
[1:48:24]
up with a maybe it's a quarterly debt strategy
report we're getting or something that's maybe
[1:48:29]
added on to this or someone just so yeah, just
feel free to send the comments and Yeah. So,
[1:48:34]
the balance commissioner street is 77 million.
Okay. 23 that we've approved already. Correct.
[1:48:42]
Yeah. We don't have to workshop in this meeting,
but just send send I do have a question for Patty
[1:48:48]
though. I think you asked the 73 that we paid
off. What did we spend that money on? That was
[1:48:54]
a function. It was all reimburseable projects.
So, it's going to be your CDBGDR projects,
[1:48:59]
your HMGP projects, FEMA projects, and um
SRF. Awesome. Let's just get that summary
[1:49:07]
and write the details. Yes, ma'am. You
want to see the invoices that we paid?
[1:49:15]
Yeah. Yeah. granular as you can get it without
spending three years doing it. Okay. Okay. Next
[1:49:21]
item 12 C. Right. Item 12 C is consideration to
approve budget amendment resolution 20260825.1 to
[1:49:29]
transfer $21,000 in funds received from local
law enforcement agencies to the Panama City
[1:49:34]
Police Department. As background information,
in August of this year, the PCPD hosted an FBI
[1:49:40]
LITA leadership course attended by members
of several local law enforcement agencies.
[1:49:45]
The participating agencies reimbured the PCPD
for their members course fees while the PCPD
[1:49:51]
paid the full FBI lead a course invoice. The
$21,000 received will be applied towards the
[1:49:56]
course invoice. Staff recommendation through
the chief of police is that the commission
[1:50:00]
approve this request and the accompanying budget
amendment resolution. Mr. Mayor, I entertain a
[1:50:04]
motion. Motion a second. Yep. Any discussion?
Please call the role. Commissioner Street. Yes.
[1:50:12]
Commissioner Hughes. Yes. Commissioner Granger.
Yes. Mayor Branch. Yes. Motion passes 4 to zero.
[1:50:18]
Commission is approved. Resolution 2026825.1,
a resolution providing for the amendment of the
[1:50:24]
approved fiscal year 2526 budget to receive
reimbursement for training hosted at the
[1:50:30]
police department. Item 12D is consideration to
approve resolution 20260825.2 2 authorizing the
[1:50:38]
city of Panama City to accept state funded uh
grant for Frankfurt Avenue trail design in the
[1:50:43]
amount of $425,000 and approved budget amendment
resolution 20260825.3. As background information,
[1:50:52]
the engineering division of the public works
department is requesting approval of resolution
[1:50:56]
20260825.2 2 authorizing the city to accept state
funded grant managed by the FDOT for the design
[1:51:03]
and permitting of the Frankfurt Avenue trail from
West Beach Drive to Pacifica Avenue, the northern
[1:51:08]
end of Frankfurt Avenue. The project will consist
of a 12- foot multi-use path in areas where
[1:51:12]
existing pedestrian facilities do not exist and to
address ADA non-compliance issues. Scope will also
[1:51:19]
include coordination with Bayine Railroad and
review for a pedestrian bridge for crossing of
[1:51:24]
Robinson Bayou. Uh, no additional rightway will
be required for this project and this project
[1:51:29]
does not require a match from city funds. Staff
recommendation for the director of public works
[1:51:34]
is that the commission approve this request. Mr.
Mayor, there were a couple of questions that came
[1:51:39]
up during audience participation. I just highlight
some of those really quick. The distance of this
[1:51:43]
path is 3.2 miles. That's a pretty substantial
path. Um, there will be some drainage work and
[1:51:49]
and survey work that we need to do in order to
make sure we don't create any uh off-site adverse
[1:51:55]
impacts on either the roads or people's front
yards. Uh there will be some utility poles that
[1:51:59]
need to be removed and relocated. Again, we'll
have to survey all of this uh in order to ensure
[1:52:05]
that it's entirely within the ride ofway. Again,
we're putting in an aluminum pedestrian bridge
[1:52:09]
uh at Robinson Bayou uh on the west side uh in
order to keep folks off of the road. And again,
[1:52:16]
uh, there will be some storm water and
drainage work for this. So again, staff
[1:52:20]
recommendation to director of public works is
the commission approved this request. Mr. Mayor,
[1:52:24]
I will entertain a motion. Motion to approve.
Second. Jonathan, the bridge, didn't that come
[1:52:29]
to some of that come through appropriation? So
that's not all loan money, right? So this is a
[1:52:35]
totally separate from that. So, the actual bridge
itself, you're correct, Commissioner Hughes,
[1:52:39]
we got about a $750,000 grant uh from the state
in order to uh refurbish uh the uh and kind of
[1:52:47]
beef back up the the vehicle bridge uh over that.
The construction of the actual pedestrian bridge
[1:52:55]
will be paid for out of that. But this uh this
particular design phase uh will cover kind of the
[1:53:01]
design of that and the and the civil engineering
around it sticking uh that particular aluminum
[1:53:06]
bridge to the west side of the Robinson Bayou
Bridge. Um but uh but the state appropriation
[1:53:11]
will pay for it. Thank you. Yes, sir. For the
public, the TPO was brought up. Um, and I kind of
[1:53:16]
wanted to clarify that the TPO is the local body,
a 19 member board that is comprised of the county,
[1:53:23]
this city, and all of the other cities in the
county. Um, the city can go seek out this uh
[1:53:32]
this grant if it wants to, but it also can go to
the TPO and ask for support from the TPO. um the
[1:53:40]
TPO did support this project and then the state
ultimately decided to reward it. So that's how
[1:53:47]
that works as any other city. I think Callaway's
got some some pretty good projects through that
[1:53:51]
process as well. Um the state had I think it was
$88 million for sidewalks. Um but uh there's they
[1:54:03]
don't have a lot of extra money for roads. So,
um, you put in for what you can get. Awesome.
[1:54:09]
All right. Any other discussion? Please call the
RO. Commissioner Street, yes. Commissioner Hughes,
[1:54:16]
yes. Commissioner Granger, yes. Mayor Branch, yes.
Motion passes four to zero. Motion to adjourn. No,
[1:54:22]
we have two resolutions. Mr. Zimmerman. Oh, boy.
Sorry. No problem. I would like to. Thank you.
[1:54:34]
Uh, the commission has adopted resolution number
20250825.2, a resolution of the city commission of
[1:54:41]
the city of Panama City authorizing the city to
accept a state funed grant for Frankfurt Avenue
[1:54:46]
trail project to enter into the agreement and
resolution 20260825.3, a resolution providing
[1:54:54]
for the budgeting of capital funds. Thank you.
Awesome. Oh, there's one more. One more. We got
[1:55:03]
a motion before. That was both of them. Both. You
read both of them? Okay. We have a motion and a
[1:55:08]
second. Please call the RO. Commissioner Street.
Yes. Commissioner Hughes. Yes. Commissioner
[1:55:12]
Granger. Yes. Mayor Branch. Yes. Motion
passes four to zero. Thank you for attending.