[0:16] Yeah, please ask for a roll call. >> Supervisor Riley.
[0:19] » Present. >> Clerk Enzaldi.
[0:20] » Present. >> Treasurer Epkin.
[0:22] » Present. >> Trustee Erda Thompson.
[0:23] » Present. >> Trustee Jaffrey.
[0:25] » Present. >> Trustee Brebeck.
[0:26] » Present. >> Trustee Karami.
[0:27] » Present. >> Madam Supervisor, you have seven
[0:30] » and present. All right, we have a full house.
[0:32] » All right, um I will go ahead and ask for a motion to approve the agenda.
[0:37] » Madam Chair, I move to approve the agenda for August 12th, 2026.
[0:41] » Second. >> Okay, any discussion?
[0:44] All in favor? >> Aye.
[0:45] » Opposed? All right, the agenda is approved as presented. Now, I'll go
[0:50] ahead and open it up for public comment and board response. Any person may come
[0:54] forward at this time to address the board. Anyone who wishes to speak is
[0:58] requested, but not required, to state his or her name for the and address for
[1:01] the record. Um you have 5 minutes to speak.
[1:08] Okay, seeing none, I will move on and ask for an approval of the minutes.
[1:12] » Madam Chair, I move to approve the minutes of the regular meeting held on
[1:16] July 8th, 2026. >> Second.
[1:19] » Okay, any discussion? All in favor?
[1:22] » Aye. >> Opposed?
[1:24] All right, minutes are approved as presented.
[1:27] Uh there is nothing for public hearings, presentations,
[1:31] or communications. So, we'll move on to a motion to approve the consent agenda.
[1:38] » Madam Chair, I move to consent agenda 7.1
[1:42] to 7.12. >> Second.
[1:44] » Okay, any discussion? All in favor?
[1:47] » Aye. >> Opposed? All right, consent agenda is
[1:50] approved. Um we have no department of port reports or updates, and moving on
[1:55] to new business, may I please have a motion for 9.1?
[1:59] » Madam Chair, move to receive and file the August 4th, 2026 primary election
[2:03] update. >> Support.
[2:05] » Okay, any discussion or do you want to go over it a little bit?
[2:07] » I I just want to say that, you know, uh we had a very high, rather unusually
[2:13] high, voter turnout for this election. Um I have some historical on the back
[2:20] page. Um we had a 44% voter turnout, which was very nice. It is the highest
[2:25] August voter turnout. Um
[2:29] ever, so that was pretty interesting. I don't know why. Um we did have one
[2:34] major, very significant, event occurred during the election. Our QVF, which is
[2:40] the qualified voter file that holds all the election
[2:44] uh election information of every voter that is run by the state, went down for
[2:49] 45 minutes in the evening on election day, which means we were unable to
[2:54] register voters during this time period and check absentee ballots and do other
[2:59] election administration stuff. Um we did My office handled it like a champ. They
[3:05] They worked really hard, and the election workers,
[3:08] uh you know, were
[3:11] working with voters as as much as we can without having access to the system. Um
[3:16] the state says that they are working on a
[3:19] permanent fix, but we shall see about that. Um
[3:23] everything else pretty much went smoothly, um but like I said, we had an
[3:28] unusually high voter turnout. Um every election after the election, just
[3:33] so the new board members know, I do write this little memo out, so you can
[3:37] capture and see how early voting was versus absentee and in-person voting. Um
[3:44] and I think it's just some useful information to have, so um I do want to
[3:49] thank uh Deputy Clerk Mert or >> Keller.
[3:54] » Still to this day, Keller for all the work that she does during elections.
[3:59] It's truly outstanding. And of course, my staff. And you know, many thanks to
[4:04] all the election inspectors who, you know,
[4:07] uh I know my staff and I put in about 18 hours in a day and
[4:11] uh it it is makes for a very long day. And so, I really appreciate all that
[4:16] everybody does to make sure that elections run smoothly. Thank you.
[4:20] » And I'd like to say from the um county side, my previous job before this, that
[4:24] Pittsfield is extremely well run and lends themselves to be an early voting
[4:28] spot for multiple jurisdictions, um helping out the surrounding areas.
[4:32] So, thank you for that. >> Thank you.
[4:35] » Okay. All in favor?
[4:37] » Aye. >> Opposed? All right. It is recorded. It
[4:40] will be filed and received. Um may I please have a motion for 9.2?
[4:45] » Madam Chair, move to approve the purchase of a 2013 Pierce platform fire
[4:49] truck from Garage Technologies Incorporated at a cost not to exceed
[4:54] $670,000, subject to the Township Attorney
[4:58] approval. >> Second.
[5:00] » Okay, discussion. We do have our um fire chief and our director of public
[5:04] safety to come on up and give us a little background.
[5:07] » Thank you. Uh good evening. Um th- this purchase
[5:11] I was hoping to have a a better update for you tonight from the insurance claim
[5:14] that we that we had on the 2020 from the 2011 platform that was damaged in 2024.
[5:20] Um the insurance claim is complete, but it is still under review, so we don't
[5:24] know how much money we're going to receive in that claim yet. Um we will be
[5:27] working closely with the finance director. If we don't reach a certain
[5:29] threshold, though, we will we would not make this purchase. So, um it understand
[5:34] that I want to make sure that you know that full disclosure. We don't have that
[5:37] dollar amount and that the the due date for this purchase is Friday. So, if we
[5:41] don't have that number from the insurance company by Friday,
[5:43] um we will have we will get past. >> Our finance director, we're working on
[5:47] our budget for next year and we're we're looking at the numbers and so there's a
[5:50] threshold that has to be made in order to us to be able to do this. So, but we
[5:53] want to be able not be able to stop it for if we can go forward to vote on it
[5:57] tonight, but again, if we don't hit the insurance claim, we will not do it.
[6:01] » Correct. >> Any questions?
[6:05] Okay. All in favor?
[6:07] » Aye. >> Opposed? Okay, here we go. We'll do
[6:10] that. Um, may I please have a motion for 9.3?
[6:14] » Madam Chair, move to approve the ESO subscription renewal for the fire
[6:17] department for report writing, EMS data collection, fire inspection reporting,
[6:23] training documentation, and scheduling at a cost not to exceed $23,397.50.
[6:30] » Second. >> Okay, um, again, it's going to be sort
[6:33] of like the the public safety show for a little bit. So, if you want to give us a
[6:37] little background while you're up here. >> So, I I'll let the fire chief speak to
[6:39] the ESO. >> we'd love to have the
[6:41] » Yeah, so this is this is like our lifeline. This is how we operate um, on
[6:46] the back end. So, report writing, all of our um,
[6:49] inspections that we do on all our businesses within the township is
[6:51] documented. Our scheduling for our staff, um,
[6:56] training, all of that is the component of this uh, programming. So, it's a um,
[7:02] annual subscription and we're just uh, asking for the renewal.
[7:07] » Any questions on this? All in favor?
[7:10] » Aye. >> Opposed? All right.
[7:13] It's approved and we'll ask for a motion for 9.4.
[7:17] » Madam Chair, move to authorize the supervisor and clerk to sign a contract
[7:20] change order 12 with BlueScope Construction at a cost not to exceed
[7:24] $21,394
[7:27] for the public safety facility improvement project subject to the
[7:31] township attorney approval. >> Second.
[7:33] » Okay, and we do want to talk a little about this. Um, I know Director Gray and
[7:36] I have talked about this per Trustee Breback's comment at the last meeting,
[7:41] which really made us stop and and think that really
[7:44] it it should come back to the board. We have approved a bright blanket amount.
[7:49] We keep coming back with sort of um transparency information, but to keep
[7:54] you updated where we're at and why change orders are coming in. Um Director
[7:58] Gray is kind of kind of go through the next couple of things and explain it to
[8:01] the board, so everybody's kind of informed, not just saying yes to
[8:03] everything blindly. >> Right. And going into this project, I I
[8:07] Yes, we wanted to address the concerns, and it's it's an understandable
[8:10] question. Part of the way that we started this project with the budget
[8:14] that we had or didn't have, um certain selections were made, certain choices
[8:18] were made that really um was kind of kicking the can down the road, and
[8:21] somebody's going to have to deal with this later, and so we're dealing with it
[8:24] now. Um I did meet with the finance director, and Kurt Weiland and I met
[8:28] compared all numbers, and we are still well within budget. So, I just We knew
[8:32] that some of these things would happen. Anytime you're renovating an old
[8:35] building, you're going to discover certain things. Um and there was also
[8:39] certain concerns with decisions that were made early that really you'll when
[8:43] we get to that portion or those portions, you'll you'll understand. Um
[8:46] we We can't We don't want to move forward
[8:49] without doing this right. >> an architect involved in the beginning.
[8:52] » Correct. >> Which is going to cause problems later
[8:54] on. >> Right. And And some of the times that
[8:56] I'm coming to you and asking for different things, the the reason we're
[9:00] doing that is in an effort to save money. If we would have done some of
[9:02] these projects through Blue Scope, um and not done them on our own through
[9:06] Vance and O'Brien, um the markup would have been significantly higher. So, it
[9:11] it's it's causing me to come to you and ask a bunch of times versus one big
[9:15] bill, but that one big bill would have been significantly higher had we not
[9:18] done it this way. So. >> And we are still waiting on um the
[9:22] release of funds from HUD, so we're just watching all of that diligently as well
[9:27] to see if we can reimburse ourselves for any of this or, you know, use it for
[9:30] other things, but we are within budget um of the the
[9:34] » for the The >> project.
[9:36] » Yes. Also, things like furniture
[9:38] um an antenna that the for radio communications. So, I'll be I'll be
[9:42] coming back with some other things, but that was done intentionally. Had we done
[9:44] it all through the construction company, it would have been 20% markup on all of
[9:48] those things. So. And so, I do have several
[9:52] » And and there questions you have to take the questions too. Please feel free.
[9:55] » I have several that I >> Or do you want to go wait to go through
[9:57] all this and ask at the end? That's fine, too.
[9:59] » Right. Like I said, I was going to ask do you want me to just work through each
[10:01] one and then call them or do you want to call them and I'll work through them
[10:04] individually? >> Yeah, I'll call these and then we'll
[10:06] work through them individually. >> Okay.
[10:08] So, this one's change order number 12. This is for sightline issues. So,
[10:13] similarly, without an architect, certain things were
[10:16] in construction, certain walls and doors were placed in places that created
[10:20] sightline issues. One of them is the east end of the men's and women's locker
[10:23] room for the police department. From the hallway and really from both locker
[10:27] rooms, you can see directly into the locker room. So, we have some sightline
[10:30] issues that need to be corrected. That's That's change order 12.
[10:35] » Any questions on that? Okay. All in favor?
[10:39] Opposed? Okay. Can we please ask for a motion for
[10:42] the 9.5? >> Madam Chair, I move to authorize the
[10:44] supervisor and clerk to sign contract change order number 13 with Blue Scope
[10:49] Construction at a cost not to exceed $20,503
[10:53] for the Public Safety Facility Improvement Project subject to the
[10:57] Township Attorney approval. >> Second.
[11:00] » Okay. >> So,
[11:01] our contract change order 13 is involves drainage from the sally port. So, the
[11:06] last fire bay on the south end of the building will be left as a bay for
[11:11] police vehicles to drive through. And if we have an arrestee, you can bring them
[11:13] in in a secure location. There's a There's floor drains in that that sally
[11:18] port that run to an oil water separator. That way, you don't pollute the Yeah.
[11:23] So, that oil water separator is actually in a location where an office will be.
[11:27] So, we need to remove that. We need to, you know, put new new in and put in a
[11:31] new oil water separator.
[11:34] » Okay, any questions on that? Okay, all in favor?
[11:37] » Aye. >> Opposed?
[11:39] All right, may I please ask for a motion for 9.6.
[11:43] » Madam Chair, move to authorize the supervisor and clerk to sign a contract
[11:46] change order number 14 with BlueScope Construction at a cost not to exceed
[11:51] $156,208
[11:54] for the public safety facility improvement project, subject to the
[11:57] township attorney approval. >> Second.
[12:01] » So, this is this is one of the um blind spots that when we were doing the the
[12:06] original planning, um decisions were made about
[12:09] construction materials. Um and I think it had more to do with an
[12:13] oversight. It's a lot It's a large project. Um but concerns about those
[12:17] materials when we when we were looking at the plans more closely, um the
[12:21] holding cells were built with drywall um and steel studs, but drywall, similar to
[12:25] a office space. The doors in that space were wood doors and not steel solid
[12:30] doors. Um really in an effort to to make that space safe both for staff and for
[12:35] any arrestees. It It really should have been done with masonry walls, um solid
[12:40] doors, and then um stainless steel like jail grade uh uh
[12:45] toilets and fixtures.
[12:48] » Okay, any questions on that? Okay, all in favor?
[12:53] » Aye. >> Opposed? Okay, that's passed. If we
[12:55] could ask authorized uh for a motion for 9.7.
[13:00] » Madam Chair, move to authorize the supervisor and clerk to sign a contract
[13:03] change order number 15 with BlueScope Construction at a cost not to exceed
[13:08] $17,917 for the public safety facility
[13:13] improvement project, subject to the township attorney approval.
[13:16] » Second. >> Um so, contract change order 15, uh it
[13:21] involves the There's a a bathroom on the west end of the building that is
[13:25] remaining, and there's another bathroom that's going to be added. The sewer line
[13:29] from that from that restroom is will be the would
[13:33] be the last of the old pipes from the building. And we're find
[13:38] we found a construction found that the condition of those sewer lines was
[13:42] was found to be inadequate. They were lacking proper pitch and the pipes were
[13:45] deteriorating. So they're looking to tie into the new
[13:50] sewer line with this change order. >> Any questions or discussion?
[13:56] All in favor? >> I.
[13:57] » Opposed? All right, that's authorized. May I
[14:00] please ask for a motion for 9.8? >> Madam Chair, move to authorize the
[14:04] supervisor and clerk to sign a contract change order number 16 with Blue Scope
[14:08] Construction at a cost not to exceed $14,124
[14:13] for the public safety facility improvement project subject to the
[14:17] township attorney approval.
[14:21] » Second. >> Thank you.
[14:23] » Thank you. Change order 16 involves efficiency of use of space but then also
[14:28] safety and safety and and security matter. So we we discovered that if we
[14:33] if we if we could create an extra interview a soft interview room in the
[14:37] main hallway off of the lobby, we could both do soft interviews where
[14:42] it's you know doesn't necessarily need to be in a in a secure lockup area and
[14:45] also we could do court ordered fingerprints or even fingerprints of an
[14:48] offender. Say if we have a juvenile offender, we can fingerprint them there
[14:51] without having to bring them into a lockup where another offender may be. So
[14:55] having a separate place to do fingerprints but then also a separate
[14:58] private place to do an interview was the intent. So adding a wall, moving a wall
[15:04] and then adding another wall in a much larger office which then creates two
[15:08] office spaces. So we're trying to you know maximize the amount of use that we
[15:11] can get out of the building. So that's what change order those were change
[15:15] order 16 were for. >> Any questions or discussion?
[15:20] All in favor? >> I.
[15:22] » Opposed? Okay, that's authorized. May I please
[15:25] have a motion for 9.8?
[15:31] Did we just do that one? Is that the last one? All right.
[15:35] 9.9, sorry. My glasses were off and I didn't see that. I was like, oh, yep,
[15:38] that it is. 9.9, please. >> Okay, Madam Chair, I move to authorize
[15:42] the supervisor and clerk to sign a contract change order number 17 with
[15:46] BlueScope Construction at a cost not to exceed $25,690
[15:52] for the public safety facility improvement project subject to the
[15:56] Township attorney approval. >> Second.
[15:59] » Thank you. Uh, change order 17 is uh kind of one of the goes goes along with
[16:04] doing, you know, renovation on an old building, you're going to discover
[16:07] things and the construction company has found that there was inadequate
[16:10] insulation within the the the attic of the building and that several holes were
[16:14] found uh in the existing drywall where they meet the uh attic. So, um
[16:19] in order to get the uh achieve R-49, they're going to need to blow in uh add
[16:23] in blown-in uh insulation. Additionally, while doing that, uh we're looking to
[16:27] add four solar tubes, which are similar to skylights, but they're not actually
[16:32] skylights, to bring some natural light into locations where people are working
[16:35] and and these happen to be places where people work all day. They're not
[16:38] officers going out on the road. These are spots where detectives and records
[16:41] people are working to bring some natural light into that location.
[16:45] » Okay. Any discussions or questions on this or anything else? I think this is
[16:48] the end of the director public safety show. Um so, if you have any questions
[16:53] about the project in general, uh and then um our project manager, Kurt
[16:56] Wyland, is also here if you have any questions
[16:59] further. >> Um Director Gray, do are we still on
[17:02] track for completion in I don't remember when when that is going
[17:08] to be. >> So, truly optimistic answer to that is
[17:11] sometime in December or January. >> Okay.
[17:13] » Uh but I could I I foresee it being March or April.
[17:16] » Yeah. And course, if they say December, you say March or April. And depending on
[17:20] how the HUD money money gets released, whether or not we can incorporate that
[17:24] or have to do another project or how we figure that out, it may be extended to a
[17:27] different phase or that sort of thing. We we don't know yet.
[17:29] » And really, once that was signed, as long as we do it right or we the
[17:33] purchases purchases that we make are done under the the rules of the HUD
[17:37] grant, we can retro with some of that those funds, too. And that would then
[17:41] bring the bond money back to the township.
[17:43] » Which would be helpful, yes. Okay.
[17:46] Thank you. >> We will definitely do a celebration
[17:48] » [snorts] >> when that's all said and done. So. All
[17:50] in favor? >> Aye.
[17:52] » Opposed? All right. Thank you so much. >> Thank you so much.
[17:56] » And may I please have a motion for 9.10? >> Madam Chair, move to authorize the
[18:00] supervisor and clerk to enter into an easement agreement with Jamie DeFlorio
[18:06] of 1479 Cobblestone Court establishing an
[18:10] easement for a new sanitary force main subject to the township attorney
[18:15] approval. >> Second.
[18:17] » We do have our director of utilities here if anybody has any questions or
[18:23] Okay. All in favor?
[18:25] » Aye. >> Opposed? All right. Authorized. May I
[18:28] please have a motion for 9.11? >> Madam Chair, move to authorize the
[18:32] supervisor and clerk to enter into a 5-year agreement with HydroCorp Inc.
[18:39] for cross-connection control software at cost not to exceed
[18:43] $117,235 subject to township attorney approval.
[18:48] » Second. >> Okay. Any discussion on this? Again, our
[18:50] director of utilities is here. Okay. All in favor?
[18:55] » Aye. >> Opposed? All right. It's authorized. Uh
[18:59] may I please have a motion for 9.12? >> Madam Chair, move to authorize the
[19:04] supervisor and clerk to enter into an agreement with Signs by Crany for the
[19:08] fabrication and installation of two park entrance signs at Monacello Park at a
[19:14] cost not to exceed $35,746
[19:18] subject to the Township Attorney approval.
[19:20] » Second. >> Okay, we do have our director of
[19:23] public parks and rec here. This is basically where we're just
[19:26] replacing our signs at the parks and I know we have one sign already started
[19:29] over at at Graywall and this will be the the Monacello one. I think in the packet
[19:33] you guys saw a picture of it. But if you have questions
[19:36] give our director here. Okay,
[19:39] all in favor? >> Aye.
[19:41] » Opposed? All right, authorized. Moving on to
[19:44] unfinished business. May I please have a motion for 10.1?
[19:48] » Madam Chair, move to adopt the 2026 Freedom of Information Act policy,
[19:53] procedures, and guidelines.
[19:57] » Second. >> Okay, any discussion?
[20:00] » I I just want to mention that this was previously brought to you in draft form.
[20:05] There have been no changes to it and it's just an updated to a 2015 policy
[20:12] that we had previously. >> Have a look at it.
[20:15] Appreciate you doing that. Okay, may I ask for a roll call for this
[20:18] one? >> Supervisor Riley.
[20:22] » Yes. >> Clerk Enzaldi.
[20:23] » Yes. >> Treasurer Epikin.
[20:24] » Yes. >> Trustee Ore Thompson.
[20:26] » Yes. >> Trustee Jaffer.
[20:27] » Yes. >> Trustee Braybrook.
[20:28] » Yes. >> Trustee Caramie.
[20:30] » Yes. >> Madam Chair, you have seven yes.
[20:32] » Thank you. Adopted. Now moving on to liaison and
[20:36] trustee reports. Do we have any? >> I do, ma'am.
[20:40] Madam Chair, I'd like to share a summary of action
[20:44] which is August 6th, 2026 Planning Commission meeting. The Planning
[20:48] Commission held a public hearing and voted to recommend
[20:53] the data center zoning regulation to the Township board with the following
[20:58] amendments. Address the issue of flooding.
[21:02] Add the word quality after word water.
[21:07] Amend section B. 2.2 to remove plan unit development reference.
[21:13] The Planning Commission held a public hearing and voted to approve the
[21:17] resolution of approval for CUP 26-05,
[21:24] the World Golf Club with following condition.
[21:28] Applicant to confirm the suit location. The Planning Commission voted to approve
[21:34] the resolution of approval for CSPA 24-11
[21:39] and RZ 24-02, Sam's Club fuel expansion.
[21:45] The next meeting will be held 20th, August 20th, 2026.
[21:51] Thank you. >> And um so as um Trustee um
[21:56] uh Jeffer said, at the Planning Commission meeting, we
[21:59] had a good attendance. Um it was very nice to see a lot of residents come out,
[22:03] 30, 40 people. And there was good discussion. I just have to say our we
[22:07] have very intelligent and engaged residents. Uh we were able to take some
[22:12] of the information that were was provided by experts um and add some
[22:17] things to the ordinance. Um our staff and the Planning Commission have done a
[22:22] great job making sure that we are putting in every possible regulation we
[22:25] can. Um we we do want to help our um jurisdictions around us. We will be
[22:31] sharing everything we have. Uh we have used several different legal um
[22:38] companies that have vetted out our ordinance. We have taken our time,
[22:42] worked with the county, worked with the state, worked with environmental groups.
[22:46] Um our entire staff has really been involved in this. So, I just like to
[22:50] commend everyone and know that um most likely in September that will be coming
[22:55] to the board. So, please take time to look at it as well. We have opened it,
[22:59] you know, there's still time for people to make comments publicly um before up
[23:04] until that time and then at the two public hearings for us to still make
[23:08] changes. I do believe it'll be a living and breathing document as the as there's
[23:14] really no expert in data centers. We'll have to stay on top of things and and
[23:18] make sure we're looking out for our community. And again, I I just think
[23:23] anything information we have we we share with the communities around us and we
[23:26] work with everyone to do this. What happens in Saline and Ypsilanti and
[23:31] Augusta affects us as well. Uh so, yeah, this is something that
[23:37] I'm happy for us to lead, um but I really want to make sure we
[23:40] leave no one behind as well as we as we do this. And so, please keep informed.
[23:46] We'll we'll modify things as need be, but that will be coming in most likely
[23:50] in September. >> Uh Supervisor Riley, um
[23:54] it's my understanding that at this time we do not have any
[23:59] current >> Correct. We do not have No one has
[24:02] approached us. They would have to go through our planning department through
[24:05] supervisor's office. Promise you no one has called or made any inquiries. Uh we
[24:10] are not necessarily a target for a large-scale data center. This is
[24:15] basically if we we had the moratorium in place, I think the biggest question was
[24:19] why not just leave a moratorium in place? And I think that's the problem is
[24:23] that you can't. It's not legally defensible. So, we're putting the
[24:27] guardrails in place and we're making sure our community's protected through
[24:30] these ordinances as best as possible. Um again, it's it's the wild, wild west and
[24:35] uncharted territory, so we'll have to just keep watching it and
[24:39] as it evolves, we'll have to evolve. Um but our most important thing is our
[24:44] resources and our residents and we got 350 responses from our residents and the
[24:50] majority do not are not in favor of opening up to large-scale data databases
[24:55] or data centers. Um so and we have not been approached by any nor do we feel
[25:01] we're a target, but it doesn't mean that next evolution
[25:06] or something else won't make us a target. So, it's just it's preventative
[25:09] and it's just to make sure um that we're
[25:13] vetting out everything before we are in a position where we have no authority.
[25:18] » Thank you. >> Yep.
[25:19] » Thank you. >> Thank you.
[25:20] » Any other reports or I do want to say that we did um last
[25:25] week do a video with SEMCOG for community. So, we um went to different
[25:30] locations and we had a lot of our partners including our Commissioner
[25:33] Sanders um was there to help us and uh the chamber and just some of our our um
[25:40] our planning commissioners were there. Our trustee um
[25:43] uh or Thompson was there as well. So,
[25:46] hopefully and it's and and Treasure Adkins as well.
[25:49] So, hopefully we'll have something in a couple of weeks and it'd be nice to be
[25:52] able to maybe at this meeting show a video that kind of highlights the
[25:55] experience of um Pittsfield Township and we can share that with everybody to
[25:59] share how wonderful our community is with others. So,
[26:02] it was kind of like one of those that came with our membership. So, why not
[26:05] take advantage of it? All right. Well, if there's nothing
[26:08] else, I will go ahead and ask for a motion to adjourn.
[26:12] Oh, I'm sorry. Public comment. So I'm so sorry. Um I'm going to open up for
[26:15] public comment. Any person may come forward at this time to address the
[26:18] board. Anyone wishes to speak is requested but not required to state
[26:21] their name and address for the record. I apologize.
[26:28] Okay. Now I'll ask for a motion to adjourn.
[26:31] » Madam Chair, I move to adjourn. >> Second. All in favor?
[26:34] » Aye. >> All right. Meeting is adjourned at
[26:37] 6:56. >> We made it.
[26:41] » There we go. >> We made it.
[26:43] » I'm the 30-minute