Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:01]
Good morning. It's August 11th,
[0:04]
2026 at 11:30 a.m. and we'll begin our
[0:07]
council work session.
[0:12]
» Oh, excuse me.
[0:17]
» So, we'll first we'll start with a roll
[0:19]
call. Councelor Whitlock.
[0:22]
>> Councelor Whitlock.
[0:23]
>> Gary Garrett,
[0:24]
>> Becky Bogdan,
[0:26]
>> and online
[0:32]
Katrice, can you confirm that you're
[0:34]
with us?
[0:47]
» What time did Rachel say she would join?
[0:52]
>> Rachel,
[0:53]
>> she said she was going to She told me
[0:55]
yesterday she was going to join.
[0:57]
She said she was Travis. She
[0:58]
>> Yeah.
[0:59]
>> Did you see that, too?
[1:00]
>> I did. Is Chavis
[1:02]
>> Can you text her and see?
[1:05]
Yeah, I texted her last night
[1:08]
and I asked her. Um, [clears throat]
[1:13]
what time should she come on?
[1:18]
» I'll text Krice and see
[1:22]
where she is. Okay.
[1:29]
and then Craig who is
[1:31]
>> sorry I'm here.
[1:32]
>> Okay, thanks Katrice and then find out
[1:35]
from Rachel
[1:37]
maybe while you're at it just shoot um
[1:39]
Craig a call and let him know not a call
[1:43]
>> let him know that we're starting
[1:44]
>> Craig is not going to be on right now.
[1:46]
He's not going to be on till later.
[1:48]
>> Do you know about what time?
[1:50]
>> Around twoish.
[1:52]
>> Okay. All right. Thanks, Katrice. All
[1:54]
right.
[1:55]
>> Yeah, he's going to be on around
[1:58]
>> Yeah. two
[1:58]
>> like one o'clock.
[2:01]
>> Okay. One one o'clock.
[2:02]
>> One.
[2:04]
>> Okay.
[2:07]
Um [clears throat]
[2:10]
the first agenda item is to approve
[2:13]
uh previous meeting minutes. They're
[2:15]
listed on our agenda. July 8th council
[2:18]
meeting. July June 9th council meeting.
[2:22]
June 17th, I'm sorry, let me start over.
[2:24]
J July 8th, 2025 council meeting. June
[2:28]
9th, 2026 council meeting. June 17th,
[2:31]
2026 council meeting. June 14th, 26 work
[2:36]
meeting. July 14th, 26 council meeting.
[2:39]
July 22nd, 26 work meeting. Are there
[2:43]
any objections or [clears throat]
[2:46]
requested changes for these meeting
[2:47]
minutes?
[2:52]
All right,
[2:54]
then we'll um
[2:57]
declare the minutes approved by
[2:58]
unanimous consent.
[3:02]
So our first business item is regarding
[3:06]
a request from Taylor Terrace, the
[3:08]
Taylor Terrace Homeowners Association
[3:10]
for city acceptance, infrastructure
[3:12]
upgrades, and financial assistance for
[3:14]
its private water system. This will be
[3:17]
presented by Lane Pierce, our water
[3:21]
resources engineer. And
[3:25]
hi,
[3:26]
I'm Lane. Um, I work for Gordon for
[3:29]
public works. Taylor Terrace is a small
[3:32]
HOA up by the the Rock Canyon Temple
[3:35]
just uh east of it. Um, and I guess I
[3:39]
can click through these. I'll be very
[3:40]
brief because we have the Shades HOA
[3:42]
here. They would like to be they had a
[3:44]
water break in their private main that enters their small culde-sac and
[3:49]
they would like to become part of the
[3:51]
city infrastructure. This is the the
[3:53]
code that we have in Provo that allows a
[3:56]
private entity to come and be part of
[3:58]
the public infrastructure.
[4:01]
Um they went got a contractor to fix the
[4:05]
in order to become a part of the public
[4:06]
infrastructure they have to meet our
[4:08]
code meet our standards our water
[4:11]
standards. in order to meet our water
[4:12]
standards. They went out, got a
[4:15]
professional bid on what it would cost.
[4:16]
This is approximately what it would cost
[4:18]
become um part of our system if you guys
[4:22]
approve it and
[4:24]
up to our standards, our
[4:28]
pipe standards. I thought I had one
[4:29]
more.
[4:31]
I have one more. Yeah, there we go. And
[4:33]
this is kind of a drawing of how we
[4:35]
would do it. This is their like I said,
[4:37]
it's kind of a little culde-sac or
[4:38]
whatever you want to call little
[4:40]
community. And this is this is the line
[4:42]
that had a break in it. And what we
[4:44]
would do the new fix would be to install
[4:47]
the meters here and then the lateral
[4:49]
would go to each uh each home. And Mark
[4:53]
Doyle from the HO is here to talk a
[4:55]
little bit more and give them a little
[4:56]
more in-depth about the situation up
[4:58]
there.
[5:00]
>> Thanks.
[5:03]
» Thank you. Excuse me. I'm nursing uh
[5:05]
ankle surgery recovery, so I'm a little
[5:08]
slow getting up here. Um, thanks for the
[5:11]
time. My name is Mark Doyle. I've um we
[5:16]
rotate responsibilities in our small
[5:18]
HOA, so I've been serving as the
[5:21]
president for the past couple years,
[5:23]
which um we lived in Provo for 20 years.
[5:26]
Uh raised our five kids here. My office
[5:29]
is just on center street here, so we're
[5:31]
big fans. Um, we have 22 homes in the
[5:34]
HOA. Uh, this affects seven of them.
[5:37]
Somehow when it was developed in the
[5:40]
'7s, um, we nor the city are quite clear
[5:43]
on what happened, but there's
[5:44]
essentially an 8 in man, like a city man
[5:48]
that goes about halfway into this
[5:49]
culde-sac and from there the individual
[5:52]
water lines like each of us would have
[5:53]
on our house um, come off that. that was
[5:56]
not really known to the next set of and
[5:59]
by the way I don't live in uh in one of
[6:01]
these seven ours is elsewhere um that
[6:05]
was not known until infrastructure
[6:07]
started to fail which is that the
[6:09]
individual line but also the assessment
[6:13]
is that the 8 in main also has is like
[6:17]
ready to fail at any given time which I
[6:20]
think Gordon Lane is that's like the
[6:22]
size that's the standard size that runs
[6:24]
throughout the city right So, that's
[6:26]
[snorts] a a big concern. And we have um
[6:31]
of the 22
[6:33]
owners, about a third of those are fixed
[6:36]
income um widows, just to give you like
[6:40]
a profile. I don't know if that's
[6:41]
interesting or not. And we've got school
[6:43]
teachers and a county deputy sheriff.
[6:46]
So, there's just a wide mix of
[6:47]
individuals there. We've um feel like
[6:50]
we're a pretty healthy HOA and we've
[6:51]
done you know we try to do a good job in
[6:54]
maintaining things that look well for
[6:56]
the city from a you know exterior and
[7:00]
grounds and everything but this uh this
[7:02]
part has caught us off guard and there
[7:04]
have been a lot of questions of how this
[7:05]
kind of would have gotten approved in
[7:08]
the first place. I think there's some
[7:09]
broader concerns from what we understand
[7:10]
as well. the meters actually are right
[7:12]
up at the houses and instead of on the
[7:15]
street and I think a concern with that
[7:17]
is like statewide and even for city
[7:19]
zoning having culinary water on the city
[7:22]
side of the meter but on private like
[7:26]
under private ownership is is an issue
[7:28]
as well. I don't I don't um say that I
[7:32]
understand the intricacies of that but
[7:34]
that's a concern as well. So, we're
[7:35]
looking to turn the uh ownership of the
[7:38]
line over to the city. And in this case,
[7:43]
there could have been an option where we
[7:44]
just replace this huge line running into
[7:45]
the culac, but that doesn't make as much
[7:47]
sense. And Lane and Gordon have been
[7:48]
great to to propose, you know, solutions
[7:51]
if this were to happen to just have
[7:54]
water lines go out to the city main like
[7:56]
it is in the rest of the city and even
[7:57]
in the rest of our development. So
[7:59]
that's the um that's the request that
[8:02]
we're m making both from a culinary
[8:06]
water standard standpoint and a safety
[8:08]
standpoint and honestly just to bring
[8:11]
that part of the development back in
[8:12]
line with with city code. Um including
[8:16]
the the new the newer one that Lane
[8:18]
referenced at the beginning. So those
[8:21]
are I guess a couple of my talking
[8:22]
points. I've never done this before. So
[8:25]
>> great. So happy to field questions and
[8:28]
all the
[8:28]
>> So Mark, just to clarify then only these
[8:31]
seven homes were connected to the uh to
[8:35]
had their the private water system. The
[8:37]
other homes west of these and the ones
[8:39]
up around the corner are already part of
[8:42]
the city's water system.
[8:43]
>> Meaning they already have like the
[8:44]
individual line that would go from this
[8:46]
house to the meter to the street just
[8:49]
probably like wherever you live.
[8:51]
>> So it's just this little culdeac. It's
[8:53]
just this little culde-sac and we have
[8:54]
actually, you know, as you know, there's
[8:56]
another little culde-sac up there. Mhm.
[8:57]
>> Um I think I think this was the first
[9:00]
one that was developed and maybe
[9:03]
[clears throat] I don't know like it was so long ago and we don't have
[9:05]
records of why they decided to do that
[9:07]
or
[9:08]
>> so there are what 20 homes
[9:10]
>> 22 okay
[9:12]
>> and the sorry the one other quick thing
[9:14]
the port the financial portion so on
[9:16]
average any of us including me if we
[9:18]
were going to replace or fix the water
[9:19]
line that's going to be a 7 to $9,000
[9:24]
replacement and so we are as an HOA
[9:28]
we're saying yeah for sure each owner is
[9:31]
respons like is naturally responsible
[9:35]
for that as anyone would be um and
[9:38]
actually the the figures lane uh I think
[9:40]
we're looking for
[9:42]
um up to $100,000 because actually the HOA or the owner's portion of that
[9:47]
would be a little more than the figures
[9:50]
I know the specifics are important to to
[9:52]
this group so we'll probably tighten
[9:53]
those up a little bit but it'll be less
[9:55]
actually than was on this Could you go
[9:56]
back to that slide? Um, Kevin, the
[9:59]
financial slide. So, you're saying the
[10:02]
city portion requested would not exceed
[10:04]
100,000.
[10:05]
>> Yeah, that's right. Because
[10:06]
>> the HO Yeah. Mhm.
[10:09]
>> Okay.
[10:10]
>> Seven homes about seven or eight. So, we would split that so we know exactly
[10:15]
what it is. But, yeah.
[10:17]
>> So, our code states that you need to
[10:21]
have these
[10:22]
lines up to code before the city will
[10:25]
take them over.
[10:26]
Why are you asking the city to do
[10:28]
something outside of code?
[10:31]
>> Um,
[10:34]
Brian,
[10:35]
>> um, so those of you who are here in 2022
[10:39]
might remember when we passed this
[10:40]
section of the code. Prior to this
[10:42]
section being passed in 2022, we didn't
[10:44]
even have a methodology for taking over
[10:48]
public ownership of private
[10:49]
infrastructure. [clears throat] But we
[10:51]
would frequently get um requests and as
[10:54]
you might remember from that
[10:55]
conversation, one of the concerns when
[10:57]
we passed the section of code is that we
[10:59]
didn't want to the city did not want to
[11:02]
kind of make it easier for developers to
[11:05]
reduce their own cost by doing private
[11:08]
infrastructure that wasn't to city
[11:09]
standards, but then forced it off on the
[11:11]
city later. Right? And so which I'm not
[11:15]
suggesting that that's the case because
[11:16]
this is as he's described this is
[11:18]
different than maybe when we usually see
[11:21]
this but but that was the concern. And
[11:23]
so the way the code this section of the
[11:25]
code is written is it says if you want
[11:29]
if you have private infrastructure you
[11:30]
want to dedicate to the public and you
[11:33]
come in city is going to decide what
[11:35]
needs to be done to it. We're going to
[11:36]
tell you what needs to be done to it. If
[11:38]
you then decide it to do it entirely by
[11:41]
yourself, it is purely an administrative
[11:43]
process. Those kinds of questions would
[11:44]
never even come to the council. The
[11:46]
administration would just work. But
[11:47]
there is a provision in in this section
[11:50]
that says you can instead of paying for
[11:54]
yourself, you can come to the council
[11:55]
and ask the council for an
[11:57]
appropriation. So, so he's following the
[12:00]
process that is in that is laid out in
[12:02]
the statute. That just makes it the
[12:04]
council's decision now, right? So, your
[12:06]
choices are pay for it yourself or ask
[12:09]
for the council to appropriate the
[12:10]
money.
[12:11]
>> Kevin, can you go back one more slide?
[12:13]
>> So, you're asking for the council to
[12:14]
appropriate the money, but why won't you
[12:16]
pay for it yourselves?
[12:17]
>> I think we're asking the council to
[12:18]
appropriate money for the portion that
[12:20]
um 50 years ago
[12:23]
either. The city shouldn't have approved
[12:27]
the the design of this. They essentially
[12:29]
put a city water man into private
[12:32]
property to connect these individual
[12:34]
lines on. None of us here have any idea
[12:35]
why that happened. There's no record for
[12:37]
why that happened
[12:38]
>> because it would have been in 1975.
[12:40]
>> Yeah, 75. I think that was when it was
[12:42]
started. Right around the mid70s.
[12:44]
>> And so we're saying um we're surprised.
[12:48]
Maybe shouldn't have been. You're
[12:50]
surprised. It's real money. Like no
[12:52]
one's debating that the $100,000 is a
[12:54]
ton of money could go to a lot of really
[12:56]
important worthy causes in the city. But
[12:59]
we're saying, can we make this a shared
[13:01]
cost? Can the homeowners individually
[13:03]
take on the portion of the cost that any
[13:05]
of us in the city would be on the hook
[13:07]
for to repair? But would the city in as
[13:10]
part of this process um essentially
[13:13]
repair or replace or change the layout
[13:16]
of what essentially is like city level
[13:18]
infrastructure that happens to be midway
[13:21]
through the culde-sac but appreciate the question. Yeah, that's
[13:26]
how I that's how I position it.
[13:28]
>> Councelor Whitlock. So Mark, I'm
[13:30]
wondering has the HOA
[13:34]
uh what have they carried in reserves
[13:36]
for water infrastructure and what have
[13:38]
they like what have you done in the past
[13:40]
to deal with this?
[13:43]
>> Well, we've not other than sprinkler
[13:45]
system which is a common property which
[13:46]
we carry reserves for. Um we've not
[13:49]
known that there was this issue of a
[13:52]
joint city level line coming into the
[13:55]
culde-sac. The assumption was until we
[13:57]
there was a break we had to excavate
[13:59]
that lines ran out to the city main. So, we've had reserves for a lot of
[14:04]
things. We reserved and repaved the
[14:06]
entire asphalt. We've painted, you know,
[14:08]
we've kept things up and this was not
[14:10]
something that we've kept reserves for
[14:12]
in the past. So, unfortunately is
[14:16]
>> Yeah.
[14:18]
>> Sorry. I was going to just ask a
[14:19]
followup is like if if the council
[14:21]
funded a smaller share saying like say
[14:23]
like the main and the tap to the city
[14:26]
standard uh could the HO finance
[14:28]
remainder like is there a number less
[14:29]
than 116 like where did you come up with
[14:31]
the 116?
[14:33]
the the number that we came to was
[14:38]
for in a in a normal like if again if
[14:41]
any of us like you Jeff or if I have to
[14:43]
replace our water line to the city
[14:46]
unless it's something really strange
[14:48]
that's going to cost 7 to$10,000
[14:51]
and so we had the contractor um who I
[14:55]
think does a number of city projects
[14:57]
already kind of gave us a split of this
[15:00]
would be this is kind of how I
[15:01]
distribute the individual portion of the
[15:03]
cost of this. Um, and that's the
[15:06]
actually probably be more like $50,000.
[15:08]
And this would be if we have to replace
[15:11]
the this 8 in city level main to the
[15:15]
street that's going to [snorts] be about
[15:16]
$9 to $100,000. So that's really how we
[15:19]
came up with that number. Um, sure. And
[15:23]
totally you could if the city was like
[15:26]
let's just say above zero. If you're
[15:28]
like, we would cover this amount, then
[15:32]
the HOA, we would have like to figure
[15:35]
out how to put an assessment to the 22
[15:38]
owners, which totally understood. That's
[15:40]
something that HOAs do. So that's a mechanism, but I but just the [clears throat] nature of the like
[15:47]
the bizarre nature of how this got
[15:49]
installed and approved 50 years ago,
[15:53]
we like to think that there's like a
[15:55]
shared opportunity for the city and the
[15:57]
HOA to say there are kind of portions of
[15:59]
this that each of us could tackle and
[16:01]
could we figure out how to do that? So
[16:05]
>> Krice, I have a question. So Gordon,
[16:08]
this you're up. This is a water line
[16:11]
that is going to a culde-sac. Correct.
[16:14]
>> Right. You you want to go back to the
[16:15]
map for the drawing.
[16:16]
>> So is this even a city asset because a
[16:18]
lot of times you're I mean that's all
[16:20]
private, right?
[16:22]
>> So the blue is the existing system and that system's private as it goes
[16:28]
through the culde-sac. So the way that
[16:30]
line is set up is you can see those
[16:33]
laterals going to each of the homes and
[16:36]
at the very end there's a circle almost
[16:39]
where that's where the leak and they
[16:41]
can't really repair it because the pipe
[16:43]
is so badly decayed that everybody else
[16:46]
will be out of power. So it's out of
[16:49]
water power just walked in. So
[16:51]
[laughter] that just threw me off.
[16:53]
>> Such impressive.
[16:56]
You're okay. That's our new direct. So, the whole line needs to be replaced.
[17:00]
So, the valve for the city is at by the
[17:03]
driveway in the park strip. So, if we
[17:06]
turn off the valve, everybody's out of
[17:08]
water, all seven homes. So, we've
[17:10]
allowed the water to keep going and the
[17:11]
leak has continued. And so,
[17:16]
did I answer any of your question or
[17:17]
just made a math answer?
[17:19]
>> I think you kind of made up your own
[17:20]
answer, but okay. So
[17:25]
this is the section that needs to be
[17:27]
prepared.
[17:28]
>> Correct.
[17:29]
>> This this is a city street. This is a
[17:32]
private street.
[17:33]
>> Yes.
[17:34]
>> So this would be a city asset then
[17:37]
because this is not a city street,
[17:39]
right? This is not going to anywhere
[17:41]
else but
[17:42]
>> just to those. So, so, so if we replace
[17:45]
that pipe, we could own that pipe, but
[17:47]
we'd have to have the HOA provide an
[17:49]
easement for us so that we could go in
[17:51]
there and maintain it. So, that that was
[17:54]
what the initial bid was for was to
[17:56]
replace that pipe. Since talking to the
[17:59]
HOA, we think there may be a less
[18:02]
expensive than just replacing that pipe
[18:05]
and coming off of it. The less expensive
[18:07]
route would be to put individual meters
[18:11]
on in the park strip. You can see we
[18:13]
have seven meters laid out and then run
[18:16]
individual uh labels to each home. So
[18:19]
that may be less costly than the numbers
[18:21]
we're showing you, but we have not had
[18:24]
that a bid for that yet.
[18:26]
>> But but all in all, like my house, I
[18:30]
have to service from wherever it comes
[18:32]
in at the street.
[18:33]
>> Yeah. to my home, right?
[18:36]
>> Yeah.
[18:37]
>> So, to me, when I'm looking at this,
[18:41]
their city thing is right there at the
[18:42]
edge of the street like mine would be
[18:44]
and then you're going across maybe a big
[18:46]
long driveway or a big long community
[18:50]
shared space that's not city space to
[18:52]
get your water infrastructure into your
[18:54]
house. I to me that is a private not a
[18:58]
public asset.
[19:01]
>> Right. So, that's correct. That's
[19:03]
totally true. It's like a private asset
[19:05]
right now. I mean, the city
[19:07]
>> one one of the I don't know if this is a
[19:09]
challenge, Gordon Lee, you have to keep
[19:10]
me honest about this, but one of the
[19:12]
challenges right now, again, however,
[19:14]
the city approved it. The meters at the
[19:16]
house. So, you've got this conflict or
[19:18]
you've got culinary water that
[19:20]
technically is a city and a state
[19:23]
responsibility that is on private
[19:25]
property up to the house. Whereas the
[19:27]
meters really how they should be like
[19:29]
with your where you live and I live the
[19:32]
meter should be out of the street. So
[19:33]
that this side of the meter culinary
[19:36]
water is the homeowner's responsibility.
[19:37]
This side's the city. Right now we've
[19:40]
got city responsibility for culinary
[19:43]
water.
[19:45]
>> So So let me try to explain what I think
[19:47]
he's saying. I'm gonna walk through the
[19:48]
map.
[19:49]
>> Take this with you because I have two
[19:50]
customers only.
[19:51]
>> Yeah.
[19:53]
>> Thank you. So if you can see this map
[19:57]
today, this would not be legal to
[19:59]
approve. The reason being is you now
[20:02]
have a water system that services
[20:04]
multiple entities. So technically they'd
[20:07]
have to set up a water company that went
[20:08]
out and tested this water that did all
[20:10]
the state requirements, do all those
[20:12]
things. And you you recall with u valley
[20:16]
the same kind of thing. And we have this
[20:18]
action in a lot of places in the city.
[20:20]
So, this was legal back in the day, but
[20:23]
it's not something that the state the
[20:26]
state frowns on this kind of thing. It's
[20:29]
not
[20:30]
something we could legally approve. So,
[20:33]
this is where every one of the physical
[20:35]
meters are on this private line here.
[20:40]
That answer,
[20:41]
>> but the city shut off is out at the
[20:43]
street, right?
[20:44]
>> This is where we have a bow to shut off
[20:46]
to their system.
[20:46]
>> Not the meters though. The meters are by
[20:48]
the houses,
[20:50]
>> but they're still in a private property.
[20:52]
>> Yeah. All all private private
[20:54]
infrastructure, private gold sack or
[20:58]
that is this is how that was determined
[21:01]
back in the [clears throat] day.
[21:02]
>> But Quell Valley was the same. Did we
[21:04]
pay for Qual or did Quail Valley pay for
[21:06]
themselves?
[21:07]
>> Um, they paid for themselves. I don't
[21:10]
believe we appropriated any money to
[21:12]
them.
[21:13]
>> I thought I thought we did unless we I
[21:17]
know that Bill was because they had I
[21:19]
mean that was a lot of infrastructure
[21:20]
and they had a lot of
[21:22]
>> there was something we did there. I I
[21:23]
would have to
[21:25]
>> I think we either appropriated some
[21:26]
money or there were certain requirements
[21:28]
that we ended up not making them do but
[21:31]
I don't think we paid our crews
[21:32]
[clears throat] might have done some
[21:34]
work.
[21:34]
>> I think we did some I think we did in
[21:36]
kind
[21:37]
replacing all the meters.
[21:39]
>> Yeah.
[21:40]
>> Some stuff like that. So there were some
[21:41]
things we did do that help facilitate,
[21:44]
but that I think was
[21:45]
>> and they have like 150 homes, something
[21:47]
like that.
[21:48]
>> It was a lot more homes, so it was a lot
[21:49]
bigger sub development. So anyway, this
[21:55]
So what they're looking for is this
[21:58]
looks like the design that we end up
[21:59]
doing something similar to this so that
[22:02]
this would reflect what's in all the
[22:04]
other
[22:06]
um [clears throat] parts of this
[22:08]
development and what's standard for the
[22:09]
city. It's just difficult for property
[22:13]
owners to have
[22:15]
um main [clears throat] lines in their
[22:17]
development that they're maintained.
[22:18]
That's not something we would do today.
[22:22]
Thank you, Gordon. We have a couple of
[22:24]
comments online. Um before we get to
[22:27]
those, let me acknowledge that Rachel
[22:29]
Whipple has joined us online as well and
[22:31]
Travis Hoben in person and we welcome
[22:34]
the mayor also. Uh so, Katrice, let's go
[22:37]
to you first and then Rachel.
[22:42]
My hand wasn't up.
[22:45]
>> Okay, Rachel.
[22:48]
» All right. Thank you. And I apologize
[22:50]
for joining late. Um, so I was really
[22:54]
surprised to see this in the packet. Um,
[22:58]
in part because I just replaced my sewer
[23:01]
line and it cost me personally $50,000.
[23:04]
So, I was
[23:07]
first off wondering if I was overcharged
[23:10]
because this seems like a lot less,
[23:12]
although we had to go full out into the
[23:14]
street to do it. But I I really don't
[23:18]
understand
[23:19]
why the city would pay to upgrade or to
[23:24]
fix
[23:26]
this asset that is commonly owned in the
[23:29]
HOA. That's private property. And I
[23:32]
understand that this isn't something
[23:34]
that we would approve. Now, you know,
[23:37]
this was a a problem that was created
[23:40]
under standards at a particular time.
[23:43]
But the fact remains that that line
[23:46]
going through the common property is is
[23:49]
the HOA's responsibility, not the
[23:51]
city's.
[23:55]
» Thank you, Rachel.
[23:56]
>> Is that something up like up for
[23:58]
discussion or or is that for you to kind
[24:00]
of talk amongst yourselves? We we'll
[24:02]
come back to you. Travis has a question,
[24:03]
too. Thank you, Mark.
[24:05]
>> Thanks. And thanks for all the info. Um,
[24:07]
sensitive to the tough situation you
[24:10]
guys are in. I guess Becky is is kind of
[24:13]
what you're saying like, well, why
[24:15]
doesn't the city just why don't we just
[24:17]
pay for, you know, up to the sidewalk
[24:19]
basically and then from there on out
[24:21]
that's not our responsibility to pay
[24:23]
for. Is that kind of what you're because
[24:25]
that's what everybody else is expected
[24:26]
to do. Is that what you're saying?
[24:28]
>> Well,
[24:30]
yeah. It seems like and even so this is
[24:33]
all private property. It's not in a
[24:34]
public street and so normally you pay
[24:39]
>> like Rachel just said but he pays from
[24:42]
her house to the road basically.
[24:44]
>> I'm pretty sure because mine's newer I
[24:46]
have to pay to the meter but the sewer
[24:47]
I'd have to pay for all the way up the
[24:49]
street. So if my sewer were to die I'd
[24:51]
have to dig up my yard plus all the way
[24:53]
into the street till it hits in the
[24:54]
middle. Is it are they in the middle of
[24:56]
the street? They're about
[24:58]
>> So So is the idea I'm just trying to
[25:00]
understand your perspective. What you
[25:01]
would kind of be looking for is like,
[25:03]
"All right, well, we'll we'll pay to
[25:04]
have the meters up at the road, but that
[25:06]
line needs to be paid for by the
[25:08]
residents. Is that essentially where
[25:10]
you're at?"
[25:10]
>> Well, even even so, yeah, wherever that
[25:12]
meter's at, which we want them to be in
[25:14]
the public right away, is why they're
[25:16]
having them up there instead of in
[25:18]
private space. it when that meter dies,
[25:21]
when that line dies again, it's going to
[25:23]
be responsibility for each one of those
[25:25]
homeowners to pay all the way to the
[25:27]
street.
[25:29]
>> And your perspective, by the way, I
[25:31]
missed your name at the beginning.
[25:32]
>> Oh, sorry, Mark. Do
[25:33]
>> Mark. Okay. Thanks, Mark. Your
[25:34]
perspective is, well, this is kind of a
[25:38]
problem that the city created 50 years
[25:40]
ago when they approved this. Um, and so
[25:46]
you guys kind of need to pay more to
[25:48]
help fix it. I I know you're not saying
[25:50]
that. I'm putting words in your mouth.
[25:51]
You're being much more tactful than
[25:52]
nice,
[25:53]
>> but but kind of that perspective of
[25:55]
like, well, this needs to be a shared
[25:56]
cost to fix this issue.
[25:58]
>> I guess where I'm struggling is I'm kind
[26:00]
of I'm kind of getting where the council
[26:02]
members are coming from that like, yeah,
[26:05]
but you guys would have to pay to fix
[26:07]
this regardless. If if the water if the
[26:10]
water meters were up at the road right
[26:11]
now
[26:13]
and you guys needed to fix this issue,
[26:15]
you guys would be paying. So, totally.
[26:17]
the fact that it was built this way
[26:19]
shouldn't really matter. That's so I'm
[26:21]
kind of I'm kind of understanding where
[26:22]
the council members are coming from.
[26:24]
>> No, I mean, listen, the I'll say it's
[26:27]
the minority view in my head, but like I
[26:29]
think the questions are like they're
[26:31]
really good questions and um but yes,
[26:34]
our our take and also Rachel on the
[26:36]
phone, first of all, I can't compare
[26:38]
sewer to water and um that's a huge
[26:42]
bill. So, I'm sorry for that. Water I
[26:44]
think generally is cheaper, but we're
[26:45]
not actually we are saying homeowners
[26:48]
should pay their portion of running an
[26:50]
individual line just like any of us
[26:52]
would. Um we have this weird situation
[26:55]
where meters that should have been on
[26:57]
the street
[26:58]
>> aren't okay.
[26:59]
>> We have this weird situation. We've got
[27:00]
an 8 in.
[27:01]
>> You're saying the sorry the portion
[27:03]
you're proposing that you guys pay is
[27:04]
that part?
[27:05]
>> Yes. The part that any of us would pay
[27:07]
if we had to replace the water line.
[27:08]
>> Does that change your perspective at
[27:10]
all? Because
[27:11]
>> because if they were installed in
[27:13]
today's standards, they still have to.
[27:15]
>> He's saying,
[27:16]
>> "Will you take the mic?" Thank you.
[27:19]
>> How do you turn it on? [clears throat]
[27:21]
>> It should be on.
[27:22]
>> It's already on.
[27:22]
Can you hear me?
[27:25]
>> Flip that button up.
[27:27]
>> Hello.
[27:28]
There we go. Okay. So, he's
[27:31]
saying
[27:32]
that they've installed these meters here
[27:35]
in the 50s or 70s or whenever it was.
[27:37]
>> The meters aren't Sorry, the meters
[27:38]
aren't even there. They're actually at
[27:39]
the house. Those are like the offshoots
[27:42]
from the main about
[27:44]
>> Gordon's saying the new leaders are
[27:46]
going to be here.
[27:46]
>> Yeah.
[27:48]
>> And the new leaders are going to be
[27:49]
here. So even if this was in today's
[27:51]
standards, these guys would still be on
[27:53]
the hook
[27:55]
for all this,
[27:56]
>> right? But if I'm understanding Mark
[27:57]
correctly, he's saying we are willing to
[27:59]
pay the portion from here to here.
[28:01]
>> He's willing to pay the portion from
[28:03]
like here to here, right?
[28:05]
We're willing to pay the the the portion
[28:09]
the the numbers that you saw there was
[28:11]
when we were going to run oh sorry
[28:13]
>> they're going to run a new 8 inch main
[28:16]
to the middle again and do offshoots the amount of
[28:22]
and so we're saying whether it's doing
[28:24]
that or running individual lines there's
[28:26]
an upfront cost that that we're asking
[28:29]
the city to share part of that to kind
[28:31]
of correct or bring to code or bring to
[28:33]
what are culinary ary code that the city
[28:36]
can share and the homeowners do the
[28:38]
rest. And then to your point, you know,
[28:40]
in 30 years when a water individual
[28:43]
water line needs to be replaced, then
[28:46]
the homeowner does that. The city's no
[28:48]
longer like there there's no confusion.
[28:50]
There's no weird setup. There's Yeah.
[28:53]
And I just want I'm not to your point, I
[28:56]
don't know what happened 50 years ago.
[28:57]
Like we're not assigning blame
[29:00]
responsibility city. I have no idea. But
[29:02]
it was weird and messy and now there's other problems besides just the location. And I think um you
[29:12]
know from a technicality standpoint,
[29:14]
sure it's there's it's on private
[29:17]
property
[29:19]
as a city, do we do we do all sorts of
[29:22]
projects and improvements that sometimes
[29:24]
benefit fewer people than others? I
[29:26]
think we probably do. Do we want all the
[29:28]
projects to benefit the whole city?
[29:29]
Yeah. the more we can do that, we we
[29:32]
love that. Um, but yeah, but I think I
[29:36]
think there's opportunity sometimes to
[29:38]
say this is a bad design. It's actually
[29:41]
like there's kind of this weird legal
[29:44]
issue with like where culinary water is
[29:46]
and there's an opportunity to to share
[29:48]
the share the fix. So
[29:51]
>> So sorry Gary, if I was fine, we'll go
[29:53]
to Ch. Last one. Um, I guess in my mind,
[29:57]
is there a way for these residents to
[30:00]
just pay for from their house to the
[30:02]
road and then the city's paying for
[30:06]
everything at the road? I mean, to me,
[30:08]
that would seem like that's what a
[30:09]
typical resident if water line breaks
[30:12]
between the road and their house,
[30:14]
they're paying that portion. So, in
[30:16]
fairness to these residents, and I I
[30:18]
think what we're worried about is
[30:19]
precedent here. We're not we're not
[30:21]
saying we're we're not being sensitive
[30:24]
to this specific plight of the the
[30:25]
plight of these specific residents, but
[30:27]
it's precedent, right? So, if we do it
[30:28]
here, then do we get 10 more calls?
[30:30]
Somebody says, "Well, hey, we got the
[30:32]
same problem. Come and fix ours now."
[30:34]
So, I think in fairness, wouldn't it be
[30:36]
like, "Okay, well, you guys take care of
[30:37]
from here to the road like you would
[30:39]
normally take care of."
[30:40]
>> And then of your new line of fixing that
[30:43]
line or putting in the line, and then
[30:44]
the city takes care of everything else.
[30:46]
In my mind, that kind of seems fair. I
[30:48]
don't know what that ends up being from
[30:49]
a cost standpoint or whatever, but to me
[30:51]
that seems like something I could get
[30:53]
behind. Anyways, sorry. Thanks for your
[30:55]
patience, Jeff.
[30:56]
>> Yeah, no worries. I actually my
[30:57]
question, one of my questions dubtales
[30:59]
nicely on that point of precedence. I'm
[31:01]
curious, this is a question from public
[31:02]
works. Do we have a sense of how many
[31:04]
other communities or developments are
[31:07]
similarly situated within Provo?
[31:11]
>> Probably not until it breaks.
[31:13]
>> Yeah, maybe. Um, we have
[31:18]
probably the ones that I'm aware
[31:20]
probably 20 to 30 more. There's maybe
[31:22]
even more than that. And um [clears throat]
[31:26]
>> so yeah,
[31:27]
>> we we developed quickly in the 50s and
[31:30]
so there was a lot of developments and a
[31:32]
lot of interesting ways doing things. So
[31:35]
ones that are like this is probably the
[31:37]
only one like I [clears throat] did not
[31:39]
say that I I have not seen any that have
[31:41]
been this
[31:43]
kind of design. This is very unique
[31:47]
but there are similar situations that
[31:49]
will will pop up.
[31:53]
>> Yes.
[31:54]
>> Okay. I suspect they
[31:56]
>> uh sorry I have another question for
[31:58]
public works and probably you're the
[31:59]
best one is so I'm curious
[32:05]
what are the benefits that the city
[32:08]
would get from doing this beyond kind of
[32:10]
correcting this odd
[32:12]
>> historical analys on a go forward basis
[32:14]
what tangible or practical benefits
[32:15]
would those be
[32:16]
>> so so right now we're leaking water in
[32:19]
that and the city's paying to do that
[32:21]
water that's not going through any
[32:23]
beater it's just leaking because if we
[32:25]
shut them off, all the residents are out
[32:28]
of water, including the one that's
[32:29]
leaking. Uh, so there's not really a
[32:32]
good way to manage that. We can't meter
[32:34]
how much is leaking, but we know it's
[32:36]
leaking every day, all the time. So, we
[32:39]
would be saving money there. Um,
[32:43]
you know, so, that there would be an actual
[32:46]
monetary benefit to getting this done
[32:48]
for us.
[32:49]
>> Is there risk? Sorry. Is there Well, go
[32:51]
ahead. That's exactly what I was going
[32:52]
to ask is like is there risk mitigation
[32:54]
for the city?
[32:55]
>> Meaning are we creating a giant sinkhole
[32:57]
between a development that by letting it
[33:00]
leak 100 gallons a day type
[33:01]
>> thing that I we've been monitoring it
[33:04]
doesn't appear that that's happening. It
[33:05]
appears to be following the water lines
[33:07]
and sewer lines and just sink in the
[33:09]
ground water. We're not having any as
[33:11]
any challenges. Doesn't say that there
[33:14]
could be something but um today it
[33:18]
doesn't appear that we have that kind of
[33:20]
a problem.
[33:22]
Thank you.
[33:24]
>> Rachel, do you have another comment?
[33:28]
>> Um, yes. Yeah. I
[33:31]
>> I just want to thank them for coming so
[33:34]
that we could be aware of this problem
[33:36]
that it's not only right here. Um, I
[33:39]
think it was 10 years ago that we had to
[33:40]
replace our water mane and we had to
[33:42]
forego any travel for 2 years based on
[33:45]
that. Um, I still I don't know that we
[33:50]
should say that the city is at fault
[33:52]
necessarily for approving this 50 years
[33:55]
ago. I mean, if this was approved, it's
[33:57]
because it was asked for. And so, the culpability
[34:03]
spreads around to everyone. Um, it does
[34:06]
matter that however we got here, this is
[34:08]
where we are and it needs to be solved.
[34:11]
Um,
[34:14]
and while I appreciate that the city is
[34:16]
losing water in an unquantified amount,
[34:20]
um,
[34:22]
it's losing that water because of a
[34:25]
poorly maintained private asset. And I'm still
[34:32]
not inclined to use the city monies to
[34:34]
fix a private asset.
[34:37]
Thanks.
[34:38]
>> Thank you, Rachel. [snorts]
[34:41]
When [clears throat] will we vote on
[34:42]
this? When will this
[34:44]
>> We're just seeking a motion today if we
[34:46]
want to continue.
[34:47]
>> Okay.
[34:48]
>> If we want to carry it to a council
[34:50]
meeting,
[34:50]
>> right? Yeah. This one isn't one that
[34:51]
you're obligated to see.
[34:54]
>> Move to count
[34:55]
>> forward. So, you can
[34:57]
>> you can let it you can let it die. You
[35:00]
can make the motion to
[35:02]
>> affirmatively let it die or make a
[35:04]
motion to take it to council. What would
[35:06]
be helpful for me to know, Lane, is um
[35:09]
to what extent we did help with the
[35:11]
Quill Valley situation. A little more
[35:13]
detail related to how we helped those
[35:16]
homeowners, what expenses, and I know
[35:19]
they're completely different situations,
[35:21]
but if we can find some commonality here
[35:24]
and understand, I I would be open to
[35:26]
doing for this community what we did in
[35:28]
Quell Valley, but I wouldn't want to do
[35:30]
something here where Qual would come and
[35:32]
say, "Well, you wouldn't do that for
[35:34]
us." I would be interested to know a
[35:36]
little more about what we did a couple
[35:38]
of years ago. I can get that in.
[35:40]
>> I would also be interested to understand
[35:42]
a little bit more about these 20 or so
[35:44]
other cases and see if we can have a
[35:46]
proposal on a general framework like
[35:48]
perhaps what councelor Hobin said about
[35:51]
going to the private property line and
[35:52]
we'll cover that as a general framework,
[35:54]
but anything on the property we leave to
[35:56]
the owners. Something like that I think
[35:57]
would be helpful because I do agree that
[36:00]
this is precedent setting and we want to
[36:01]
be fair to all of these similarly
[36:03]
situated properties.
[36:05]
>> So is there a motion then to um
[36:09]
councelor Hoben?
[36:10]
>> Well I I do we need a motion? I mean you stated what you wanted.
[36:16]
Um, yeah. I mean, my recommendation
[36:19]
would be I guess I'll make a motion and
[36:21]
we can figure it out, but that we come
[36:24]
up with a framework like Jeff's saying,
[36:26]
and I guess in my mind, I don't know if
[36:29]
I jump jump to this, but the framework
[36:32]
would be that the residents pay to the
[36:34]
road and then the city pays for the
[36:35]
portion at the road, you know, then
[36:37]
putting in those new meters um and
[36:39]
whatever else they need to do at the
[36:40]
road. But I don't know what that costs
[36:43]
look like. you know, I don't know how
[36:44]
that splits the costs. I but um that's a
[36:48]
framework I would like to look at. So, I
[36:49]
guess the motion would be for us to
[36:50]
explore that framework, understand what
[36:52]
those costs would be to residents, what
[36:53]
the costs be to the city, and then in
[36:56]
addition, how many other situations
[36:58]
around the city might be impacted in a
[37:00]
similar way so that we can know what the
[37:03]
implications are here and then I guess
[37:05]
we can wrap in the request to understand
[37:08]
what we did at Quill. So, I guess we're
[37:10]
just making a motion to come back with
[37:11]
more information that then we can use to
[37:12]
make a better decision regarding a
[37:14]
potential framework.
[37:15]
>> Okay, sounds good. Is there
[37:17]
>> as clear as mud?
[37:18]
>> I'll I'll second that motion.
[37:19]
>> Okay, and a second by councelor
[37:21]
Whitlock.
[37:22]
>> Um, so I'll call for a vote. Councelor
[37:24]
Hoben,
[37:25]
>> yes.
[37:26]
>> Councelor Whitlock,
[37:27]
>> yes.
[37:27]
>> Councelor Garrett, yes. Councelor
[37:29]
Bogden,
[37:29]
>> no.
[37:30]
>> Councelor Whipple,
[37:33]
>> yes.
[37:34]
>> And councelor McKay,
[37:36]
>> yes. So that motion passes by a vote of
[37:39]
five to one.
[37:41]
>> Sorry.
[37:42]
>> Um and Garrett, I would just like to to
[37:44]
add though that this identified problem
[37:48]
does need to be taken care of
[37:51]
soon. And I I would like to also know
[37:54]
from public works what their normal
[37:57]
procedure would be when they've
[37:59]
identified some sort of a leak on
[38:01]
private property, how they approach that
[38:04]
owner and get them to rectify the
[38:07]
problem. Um
[38:09]
so in with that information gathering
[38:12]
for the similarly situated, I also want
[38:14]
to know about similar leak problems and
[38:16]
how long we leave these things
[38:18]
outstanding and what kind of action the
[38:20]
city would normally take.
[38:22]
Okay. Thank you, Councelor Whipple.
[38:24]
That's been noted and and so um to that
[38:28]
end, if it could come back in two weeks,
[38:31]
that probably would be helpful.
[38:34]
>> Okay. All right.
[38:36]
>> Thank you.
[38:37]
>> And thank you, Mark, for being here
[38:39]
today. Thank you.
[38:42]
>> Next, we have a discussion regarding
[38:43]
outdoor lighting standards. This will be
[38:46]
presented by our intern, Britain
[38:48]
Johnson.
[38:58]
Okay, thank you, council. We're a little
[38:59]
behind schedule, so I'll try to be
[39:01]
brief. Um, but there was a request that
[39:04]
came in uh hoping to examine our outdoor
[39:07]
lighting code um to see how we could
[39:09]
mitigate light pollution while
[39:11]
prioritizing road and uh pedestrian
[39:14]
safety on our roadways. Um and so I did
[39:18]
some research on that and would like to
[39:20]
share a little bit. Um these are some of
[39:22]
the guiding tenets that I used in my
[39:24]
research. These are five principles for
[39:26]
responsible outdoor lighting. These are
[39:27]
published by Dark Sky International and
[39:30]
the illuminating engineering society.
[39:33]
And to condense this even further, it's
[39:35]
just using light only where it's needed
[39:37]
and how it's needed and using the
[39:39]
correct light to do so. So, if we could
[39:42]
um go to exhibit A, please, on the
[39:44]
ordinance.
[39:46]
Um I'm just going to go over a couple of
[39:47]
the proposed changes. Um we'll start
[39:50]
with correlated color temperature,
[39:53]
which is in section 03
[39:59]
under general revisions. So, um color
[40:03]
temperature is uh how warm or how cool a
[40:06]
light looks to your eyes visually. The
[40:09]
warmer it is, the lower on the color
[40:10]
temperature scale. The bluer it is, the
[40:12]
higher. And so 3,00 Kelvin is kind of
[40:17]
the upper limit of the dark sky
[40:18]
standard. And so anything um at 3,00
[40:22]
Kelvin or below for outdoor lighting
[40:24]
would be considered dark sky compliant.
[40:26]
There is a trade-off with um introducing
[40:29]
a captive color temperature, and it's
[40:31]
that the warmer you go, the harder it is
[40:35]
to render color both in our eyes and on
[40:37]
cameras. So, for security footage and
[40:40]
things like that, having a necessary
[40:42]
like 3,000 is plenty, but having um a
[40:45]
certain level of bless I guess to the
[40:48]
light is important. Um the opposite end
[40:50]
of that is that if it's super blue, it
[40:53]
leads to some of the problems with
[40:55]
atmospheric light pollution
[40:57]
um and affects sarcadian rhythms for
[41:00]
humans and wildlife among a bunch of
[41:02]
other things. So, that would be that's
[41:03]
what's currently in code. Um, if you
[41:05]
could go back to the slides.
[41:09]
Thank you, Kevin.
[41:18]
All right, there we go. This is a scale
[41:20]
to kind of give you a visual of what the
[41:22]
different color temperatures look like.
[41:24]
What's currently written is the second
[41:27]
um of the three options. 2700K is u
[41:31]
sufficient for most uses. However, our
[41:34]
current street lights that have been
[41:35]
being installed for the last couple
[41:36]
years or so, um, according to the energy
[41:39]
department, um, are 3,000 Kelvin, so
[41:42]
they'd have to get new specs for all of
[41:44]
their new lights if we did end up doing
[41:46]
something a little bit more aggressive.
[41:48]
Um, and this is the more conservative
[41:50]
option, or we could do a hybrid of those
[41:53]
two things, which we'll open to
[41:54]
discussion. Um, back to the exhibit.
[41:58]
Sorry, we'll be jumping back and forth
[42:00]
in just a second. Um,
[42:03]
the next big change to the outdoor
[42:05]
lighting is requiring full shielding,
[42:08]
which our current code requires cut off
[42:10]
lighting. And if you could go up to 02.
[42:13]
Oh, actually it's right here. Excuse me.
[42:15]
Um, the definition for fully shielding
[42:18]
is that the light has to be recessed
[42:21]
into the fixture, which some of the kind
[42:24]
of cobrahead street lights that we've
[42:26]
seen throughout the city that are a
[42:27]
little bit older are jut out. Um, and
[42:31]
additionally, none of the light can go
[42:32]
above the horizontal plane, meaning none
[42:34]
of it can go up. Um, it all needs to be
[42:37]
directed downward. Okay? And that, um,
[42:40]
applies to anywhere in the code where it
[42:41]
says cut off or shielded. It's now going
[42:44]
to say fully shielded and full cutff.
[42:46]
Okay? Um, and then the last um, oh, just
[42:51]
a couple of other small changes to the
[42:53]
code. If you could scroll down a little
[42:54]
bit to 05, I believe.
[43:02]
So, previously there was a a um a cutout
[43:06]
for um lighting that met a certain
[43:09]
historical or architectural style to
[43:12]
look like it was older. Um it didn't
[43:14]
have to be shielded. there are lights
[43:15]
that are fully shielded and would meet
[43:17]
the color temperature requirements that
[43:19]
do still have that historical
[43:21]
architectural style. So, we just kind of
[43:23]
cut out that loophole. Um, and then
[43:26]
lastly, um, are some exceptions to this
[43:29]
code. So, uh, Christmas lights, those
[43:32]
aren't going to be touched. Um,
[43:35]
construction or emergency lighting,
[43:37]
airport,
[43:38]
um, sports lighting, and a few others.
[43:41]
Um, with sports lighting, um, the limit
[43:43]
for color temperature is going to be
[43:44]
5,700,
[43:46]
uh, Kelvin as proposed. That's the upper
[43:48]
limit for dark sky compliance. It allows
[43:51]
cameras to render color really really
[43:53]
well when they're on TV and so the
[43:56]
players can see the fall. Um, last
[43:58]
thing, I already said last thing, but
[44:01]
the last last thing, um, if you keep
[44:03]
scrolling down is about electronic
[44:05]
display signs. So um in chapter six of
[44:09]
our code, it talks about on premises
[44:12]
electronic display signs and measures it
[44:15]
in nits, which is a way to measure the
[44:17]
surface brightness of the um the sign.
[44:21]
We're just updating our code. If you can
[44:23]
keep scrolling, sorry, it's exhibit B.
[44:32]
There we are. Perfect. Thank you. So all
[44:34]
we're doing is we're um using that same
[44:37]
standard that which is 300 nits as the
[44:39]
maximum at nighttime and 5,000 nits
[44:42]
during the daylight um for electronic
[44:44]
display signs that are off premises
[44:46]
meaning not on the property. Okay. Um
[44:49]
and then if you could go back to the
[44:50]
slides I just have one quick picture to
[44:52]
show and then we'll open for discussion.
[44:56]
Okay, perfect. Thank you. That's a
[44:59]
example of full shielding versus just
[45:02]
shielded fixtures.
[45:04]
Um, can we discuss that?
[45:07]
Yes. And we're already making some of
[45:09]
these changes. So, the dark sky
[45:11]
compliant lighting for street lights has
[45:13]
already been happening for the last
[45:14]
couple of years. So, nothing's going to
[45:16]
change on that front the way it's
[45:18]
currently proposed. Then I went over
[45:19]
some of those exceptions. Um, this
[45:22]
picture I think gives a some what the
[45:24]
practical impact might be of some of
[45:26]
these changes. This is Moab, Utah's main
[45:29]
street. This was before their dark sky
[45:31]
policy and after. So you can see the
[45:33]
road is actually not super illuminated,
[45:35]
but the sky is. Whereas when the light
[45:38]
is directed downward, the sky is much
[45:41]
darker. However, the streets actually
[45:42]
appear much more well lit and safer.
[45:44]
>> That same time of day, same day of the
[45:47]
year, whatever.
[45:48]
>> Yep. You can see this building here and
[45:50]
that building. It's just, I guess, moved
[45:52]
a few feet, but yeah, same same time of
[45:55]
night, everything. Um, and this color
[45:57]
temperature is 2700K,
[46:00]
just for reference. So, ours is even a
[46:02]
little bit more white than that if
[46:04]
you're concerned about it feeling too
[46:05]
orange. Um, this is like the old Cobra
[46:08]
head street light. It's the sodium bulb.
[46:11]
And then this is the more
[46:13]
>> this is the what our uh new street
[46:15]
lights look like now.
[46:16]
>> Yeah, I've seen those showing up in my
[46:18]
neighborhood.
[46:20]
>> Good.
[46:20]
>> I hope that you've impro you've enjoyed
[46:22]
the improvements. Um but these are the
[46:25]
next steps. We can uh move this to a
[46:28]
night meeting as currently proposed. We
[46:30]
can amend the proposal or continue this
[46:32]
to a future work. So that's all I have
[46:34]
to say.
[46:35]
>> You know, this issue was brought forward
[46:37]
by three council members, councilors
[46:39]
Whitlock, McKay, and Christensen. I'd be
[46:41]
interested in hearing from councelor
[46:43]
Whitlock or councelor McKay if this does
[46:47]
what you had hoped it would do. What are
[46:49]
some of your thoughts?
[46:50]
>> Yeah, I So I can just speak for myself.
[46:52]
I uh
[46:54]
one of the things I I think is amazing
[46:56]
about Provo is we're close to the
[46:57]
mountains. We have some of these amazing
[46:59]
natural resources and I think adding the
[47:01]
stars to that is going to be amazing. It
[47:03]
also when during the campaign I heard a
[47:05]
lot from residents kind of complaining
[47:07]
about light at night and making it
[47:08]
difficult to sleep and going to sleep
[47:09]
and so it has practical benefits. But I
[47:12]
didn't want to look at something too
[47:14]
aggressive and and wanted something that
[47:17]
was sort of reasonable, moderate, not
[47:19]
add costs to businesses or the city, but
[47:21]
over the next 10 to 20 years, you'd see
[47:22]
a substantial improvement. And I think
[47:24]
this does a pretty good job with that.
[47:26]
One thing, if it's okay that I add, all
[47:28]
of this is not retroactive either. This
[47:30]
doesn't apply to any existing lighting.
[47:32]
This is only going to be going forward.
[47:33]
So, new construction,
[47:35]
>> remodels, replacements of old lighting,
[47:37]
that's what it will apply to. Councelor
[47:39]
McCay, do you have anything to add to
[47:41]
what councelor Whitlock said?
[47:43]
>> No, that was good.
[47:45]
>> Okay. Councelor Bogdan,
[47:47]
>> I have a couple of things. So, does this
[47:49]
apply to like my outdoor lights on my
[47:52]
house?
[47:52]
>> Yes. As currently proposed.
[47:55]
>> It's currently
[47:56]
>> for if you once it needs to be replaced.
[47:58]
Yes. Once the Go ahead.
[48:01]
>> No, she's talking about like Christmas
[48:03]
lights, right?
[48:04]
>> No. No. Your porch. talking about my
[48:06]
porch lights on my front and my
[48:08]
>> back lights.
[48:10]
>> Only if you replace them.
[48:11]
Correct. I'm
[48:13]
sorry. Thank you.
[48:14]
>> Where do you even find my light maps?
[48:17]
>> Um, we can I have several resources that
[48:20]
maybe we could post on uh the city
[48:24]
website or somewhere with with approved
[48:26]
lighting standards. I've seen several
[48:28]
other cities kind of provide an
[48:29]
approval.
[48:30]
>> You know, a lot of times like I've
[48:31]
bought mine at Costco where they're only
[48:33]
$30 a light. you start making these $100
[48:35]
a light or $200 a light
[48:39]
[laughter]
[48:41]
>> that's a stinking concern though, right?
[48:44]
>> Yeah.
[48:45]
>> Then it starts adding all this light and
[48:47]
one of the reasons why we have our power
[48:48]
program that I keep on hearing over and over again is because people
[48:51]
did want street lights.
[48:54]
>> Um
[48:56]
my other question would be how many of
[48:58]
these do we have in stock?
[49:00]
>> It was the opposite.
[49:09]
How many of these do we have in stock?
[49:10]
Like if we put this in code today, are
[49:13]
you going to be stuck with 200 street
[49:15]
lights that you can't use tomorrow?
[49:17]
>> No, we have made changes for a long time
[49:20]
ago. So everything inventory is new and
[49:23]
in compliance. So we have been doing
[49:24]
that sky for a few years now in terms of
[49:27]
the street lights. But he said that the
[49:30]
ones that we're installing now are 3,000
[49:32]
and they need to be 2700.
[49:34]
>> No, we are proposing the 3,000 or less.
[49:38]
>> Oh, you are proposing. So 3,000 will
[49:40]
>> 3,000 is what's currently in the
[49:42]
proposed code. That 2700 is a more
[49:44]
aggressive option that it's open to you
[49:47]
if you would like to choose that. I just
[49:48]
wanted to make known.
[49:50]
>> 2700 is what was in the photo, not
[49:52]
what's in the proposal.
[49:53]
>> Oh, okay.
[49:54]
>> Yeah. Sorry for the confusion.
[49:56]
[laughter]
[49:56]
>> Okay. because I don't want to be stuck
[49:57]
with 200 lights that now we have nowhere
[50:00]
to go. I would much rather use up the
[50:03]
inventory and be, you know, that way as
[50:07]
well.
[50:08]
>> Okay.
[50:08]
>> And councelor Boggin's first question
[50:10]
is, are these more costly?
[50:11]
>> Yeah, great question. They're not. So,
[50:13]
the way that LEDs, at least modern LEDs
[50:16]
work, is that the way to change the
[50:18]
color temperature is to put a different
[50:20]
level of phosphorus on the light that
[50:23]
changes the wavelengths that actually
[50:25]
come out of it. So there's no
[50:26]
significant cost difference between a
[50:28]
warmer color temperature light and a
[50:30]
cooler one.
[50:31]
>> Can we get that in our packet for when
[50:33]
it when it
[50:34]
>> per Yeah, absolutely. I'll write that
[50:36]
down.
[50:38]
>> Councelor Hogan, did you have other
[50:40]
questions?
[50:41]
>> Well, I guess I just wanted some clarity
[50:42]
on [clears throat] what councelor Bton
[50:44]
was asking. So like in my house, we can
[50:48]
use my house for example, I have porch
[50:51]
lights, but [clears throat] there's an
[50:52]
overhang. They're under an overhang. So,
[50:54]
>> they're not they're not going up. Um,
[50:57]
there are some that are under like the
[50:59]
eaves of the house.
[51:00]
>> Mhm.
[51:00]
>> I assume those would not be an issue,
[51:03]
right?
[51:04]
>> As long as the lights are directed
[51:05]
downwards and recessed, then Yeah.
[51:08]
>> But then I have one like right outside
[51:10]
my door
[51:12]
that lights up the area. There's,
[51:15]
[clears throat] you know, there's an E.
[51:16]
But I guess to me, I don't want to put
[51:20]
something out there that leads to a
[51:22]
bunch of a lack of clarity for residents
[51:24]
and
[51:25]
>> Okay, I think it's
[51:26]
>> so like, okay, so so picture my backyard
[51:30]
door or even my side door. I've got one
[51:33]
that comes off the house. I wish I could
[51:36]
draw this, but basically it's like at at
[51:39]
door level, like it's at like height
[51:41]
level. It's right here by the door, and
[51:43]
it shines out this way. right now.
[51:45]
There's there's eaves of the house, but
[51:47]
that's further up. So, does that have to
[51:50]
be pointed down or and then I also have
[51:54]
a few flood lights in my backyard that
[51:56]
we [clears throat] flip on like if the
[51:58]
kids are playing in the backyard and
[52:00]
those are higher up and those are a
[52:02]
little bit
[52:02]
>> more like kind of light the whole
[52:05]
backyard
[52:06]
>> and they're a brighter light, they're a
[52:07]
whiter light.
[52:08]
>> Anyways, I guess maybe the point I'm
[52:11]
making is that we have to we have to
[52:13]
clarify this. I think if if I'm not
[52:16]
going to replace that light now because
[52:18]
now I'm probably going to have to find
[52:19]
something.
[52:20]
>> But I never was planning to replace any
[52:23]
ball. But
[52:24]
>> one thing I guess I just want clarity
[52:26]
around that for resident clarify. But as
[52:28]
I read all the documentation, it was
[52:30]
referring to like offremise
[52:33]
lining. I don't clean any like people
[52:37]
properly.
[52:37]
>> Yeah, that was the guidance we gave of
[52:39]
to try to minimize any requirements on
[52:42]
the individual home. So,
[52:43]
>> so it's off premise.
[52:47]
» That's my understanding. I was a bit
[52:48]
surprised by
[52:50]
>> that.
[52:50]
>> I can make sure that that's super
[52:52]
specific. So, if I'm understanding
[52:53]
correctly,
[52:55]
>> we we don't want any kind of any of
[52:57]
these kind of requirements to apply to
[52:59]
single family homes or any kind of on
[53:02]
premises.
[53:03]
>> What are you providing? We're good.
[53:04]
>> Yeah.
[53:05]
>> So, what does premises mean? My
[53:06]
property?
[53:07]
>> Yes, that's my understanding.
[53:08]
>> Anything on your own property?
[53:10]
>> You can do whatever. Then what would be
[53:11]
an off property off-remise sign? Would
[53:14]
like the mall huge sign be underneath
[53:17]
something?
[53:17]
>> That falls under a different criteria.
[53:19]
>> Yeah. Say well signs and lights are two
[53:22]
different things, but and so we're kind
[53:23]
of conflating the the terms, but we
[53:26]
refer to signs as being either on
[53:28]
premises or off- premises. Off- premises
[53:30]
is the legal term for a billboard. It
[53:32]
means they're advertising something they
[53:34]
don't sell on the property where the
[53:36]
sign is.
[53:36]
>> Okay? An onremise sign is a sign in
[53:39]
front of your business that advertises
[53:41]
your business, right? So, so that's the
[53:44]
sign piece of this. Then, and then we're
[53:47]
and the second issue is just whether
[53:48]
we're talking about lights. I I'd have
[53:51]
to look because I don't I don't think
[53:54]
off premise is the right phrase to use
[53:56]
when we're talking about lights because
[53:57]
parking lots are part of the premise and
[53:59]
we do want to address parking lot. So I
[54:02]
think we're more talking about maybe
[54:04]
lights that are on structure residential
[54:07]
structures versus off the structure.
[54:09]
>> So we just need clarity on that. But we
[54:11]
we'll we'll we'll look through make
[54:13]
sure.
[54:13]
>> Yeah. The intent was not to put burden
[54:16]
or requirements on sink on homes.
[54:18]
>> Yeah. And then the other thing I was
[54:19]
going to make which I think Travis hit
[54:21]
on when he was talking through it is
[54:23]
that there's a difference between
[54:25]
replacing the light and replacing the
[54:27]
fixture. If you replace the bulb, you'd
[54:30]
have to come into compliance with the
[54:31]
color issue, but you wouldn't have to
[54:34]
also fix the fixture definitely the
[54:37]
intent.
[54:38]
>> And so fixtures
[54:40]
>> and existing fixtures are all in all in compliance. So it' only be for new
[54:45]
fixtures be. But we'll
[54:47]
>> but
[54:49]
that's not even for residential.
[54:50]
>> Yeah.
[54:50]
>> Well, yeah, because I was going to say
[54:52]
nobody's going to read this code.
[54:54]
Nobody's going to understand this.
[54:55]
Nobody's going to do this.
[54:58]
It it it just seems too complex to start
[55:00]
getting
[55:00]
>> well. Well, and that's why I said
[55:01]
because it's only for new construction,
[55:03]
the developers are going to read it and and and planning is going to review
[55:07]
it when they review the plan. So,
[55:08]
>> the only time it's going to come up is
[55:10]
when somebody's submitting a proposal
[55:11]
for a new development or for a permit
[55:13]
for a remodel,
[55:17]
» we'll clarify that.
[55:18]
>> Yeah, let's let's clarify that because
[55:21]
>> if one of my residents or even if I got
[55:23]
a zoning violation for the color of my
[55:25]
light, I'd be really pissed.
[55:27]
>> [laughter]
[55:28]
>> I agree. I agree with you. And that was
[55:29]
not at all. It's mostly as the city
[55:32]
redevelops and we get new development,
[55:34]
then we bring it more and more into its
[55:36]
compliance. So, like I said, it's a
[55:38]
long-term investment for I think a
[55:40]
beautiful outcome in 10 to 20 years.
[55:42]
>> So, I'll look for a motion to either
[55:44]
continue clarifying and bring it back to
[55:46]
a future work meeting or if that cl or
[55:49]
if you want to have it clarified and
[55:51]
bring it to a council meeting, we can do
[55:53]
it that way, too.
[55:57]
I Okay, I'll make a motion that it comes
[55:59]
back to here to a work meeting because I
[56:02]
would like to look at it and make
[56:03]
refinements before it went to a council
[56:04]
meeting. So, I make a motion that this
[56:08]
ordinance comes back to council. What do
[56:11]
we want to say in a month? Is that going
[56:13]
to be
[56:14]
>> honestly in two weeks? I think we can
[56:16]
all
[56:16]
>> two weeks would be good. Okay, bring it
[56:18]
back in two weeks.
[56:20]
>> Is there a second?
[56:21]
>> I'll second that motion. Okay. Sounds a
[56:23]
second by councelor Whitlock. With the
[56:25]
motion by councelor Bogdan. I'll call
[56:27]
for a vote. Councelor Whitlock.
[56:29]
>> Yes.
[56:30]
>> Councelor Garrett. Yes. Councelor
[56:31]
Bogden.
[56:32]
>> Yes.
[56:32]
>> Councelor Hoben.
[56:34]
>> Yes. With the caveat that t technically
[56:36]
we are supposed to have discussion on
[56:38]
the motion, but
[56:39]
>> thank you.
[56:40]
>> I don't think there is one for this, but
[56:41]
I'm just saying.
[56:42]
>> Thank you for reminding me.
[56:44]
>> Councelor Whipple.
[56:46]
>> Yeah, if there had been discussion, I
[56:47]
would have said that. I'm completely in
[56:48]
support of this and really glad to see
[56:50]
it coming. Um, I don't actually see the
[56:52]
need for a delay, but I will go with the
[56:54]
group on that. So, I'll vote yes.
[56:56]
>> And councelor McKay?
[56:59]
>> Yes.
[57:00]
>> Okay. So, that motion passes 6. I
[57:03]
apologize for skipping over the
[57:04]
discussion.
[57:06]
All right. Thank you, Breton.
[57:08]
[clears throat]
[57:10]
Next, we have a resolution adopting an
[57:12]
American Americans with Disabilities Act
[57:15]
transition plan. This will be presented
[57:17]
by one one of our engineers, David
[57:19]
Mickelson. David, welcome.
[57:25]
Thank you, council. Appreciate being
[57:27]
here. Um, today I'm just presenting on
[57:29]
the transition plan. So, I'm going to
[57:32]
kind of go over some background of how
[57:33]
we got here, why we need this, and then
[57:36]
kind of our steps forward from this. So,
[57:38]
um, a little background, ADA, um, the
[57:42]
American Americans with Disabilities Act
[57:44]
from 1990,
[57:46]
um, requires all public entities to have
[57:49]
a transition plan. Essentially, a plan
[57:51]
that shows what's wrong in the city and
[57:53]
how we're going to move into compliance.
[57:56]
Um, this is not just physical
[57:58]
facilities, which I think often we think
[58:00]
of when we talk about um, ADA
[58:03]
facilities. Um but this can extend to
[58:05]
communications, public meetings, um
[58:08]
trails, restrooms. There's a lot of
[58:11]
things that are incorporated in ADA. So
[58:15]
really the questions um that this kind
[58:17]
of answers is not that is this building
[58:19]
ADA compliant, but you know, can someone
[58:21]
with a disability meaningfully access
[58:24]
all of our services, our programs, you
[58:27]
know, in a in a reasonable way? Um the
[58:29]
plan details kind of some of this
[58:31]
background information and talks about
[58:33]
our responsibility as as the city. I'm
[58:36]
going to just kind of briefly go over
[58:38]
those. Um but our responsibility as
[58:41]
provo city is to provide equal access,
[58:44]
prevent discrimination,
[58:46]
um make reasonable accommodations,
[58:49]
provide effective communication,
[58:51]
uh have a system for ADA compliance
[58:54]
which includes ADA coordinators and a
[58:56]
grievance protocol and then to develop a
[58:59]
transition plan. So the plan that I have
[59:02]
put together here and presenting um it
[59:06]
is we we'll adopt it that's the motion
[59:10]
is to to put this into place and accept
[59:12]
it as the official plan. It is a work in
[59:14]
a progress and so there is more that's
[59:17]
needed here and I'll I'll discuss that.
[59:19]
But so so what is this plan? This plan
[59:21]
is basically our road map. Um because
[59:23]
the city can't reasonably address all of
[59:25]
our barriers that we have for ADA all at
[59:27]
once. um this is basically a roadmap
[59:30]
that says, "Hey, we're aware of these
[59:32]
issues and this is how we're going to
[59:33]
grow into compliance." Um and so it it
[59:38]
not only details that, but kind of
[59:39]
creates a mindset of, you know, how can
[59:41]
we make this a better experience for
[59:43]
those with disabilities here in the
[59:45]
city.
[59:49]
Um so there's two parts of this plan.
[59:52]
I'm going super quick, so I hope there's
[59:54]
questions. I may not need the full time.
[59:55]
I apologize. Um there's two parts of
[59:58]
this this plan that are kind of the
[59:59]
major components. The self-evaluation
[1:00:01]
and then the transition plan itself. The
[1:00:03]
self-evaluation is an assist is an
[1:00:06]
assessment of the city's existing
[1:00:07]
programs, services, activities,
[1:00:10]
facilities and practices and it's done
[1:00:12]
to identify those potential barriers or
[1:00:14]
existing barriers that we have in the
[1:00:17]
city across all those things. Um so it
[1:00:20]
really provides the information that
[1:00:22]
helps fuel the plan. So some of the
[1:00:26]
things so right now the plan the plan
[1:00:28]
that's proposed includes assessments
[1:00:30]
that have been done through parks and
[1:00:32]
wreck as well as public works um while
[1:00:35]
the other city program services will
[1:00:37]
continue to be evaluated and we are
[1:00:39]
actively working with those other
[1:00:40]
departments to be able to help move
[1:00:42]
through that process. Um but right now
[1:00:45]
just parks and wreck and public works
[1:00:46]
are included in this plan. The great
[1:00:48]
thing is that this is a living document
[1:00:50]
and so as we get those additional
[1:00:52]
assessments and identify those needs,
[1:00:54]
they can be added very simply. Um so
[1:00:57]
with public works and parks, things that
[1:00:59]
have been assessed are like site access,
[1:01:02]
sidewalks, curb ramps, um parking lots,
[1:01:05]
how to access from parking lots to
[1:01:07]
facilities, building access, uh
[1:01:10]
restrooms, and those amenities within
[1:01:12]
the restrooms, and then recreational
[1:01:14]
amenities like playgrounds, picnic
[1:01:16]
areas, things like that. Um and so those
[1:01:19]
evaluations that I have contained here
[1:01:21]
in this plan help fuel what we're going
[1:01:23]
to do about it. Um, and obviously that
[1:01:26]
plan again will change and it'll evolve
[1:01:28]
as we add additional information. Uh,
[1:01:30]
the transition plan then takes this
[1:01:32]
information and says here's how we're
[1:01:34]
going to implement it. Um, and there's a
[1:01:36]
number of ways that they're that can be
[1:01:38]
implemented and changed and it kind of
[1:01:40]
depends on the department and and what
[1:01:42]
needs to be changed. Um, but I kind of
[1:01:44]
broke it down where it's like some are
[1:01:46]
done through maintenance and operational
[1:01:48]
costs, right? Things that can be done
[1:01:49]
very quickly and very uh relatively for
[1:01:52]
low cost. Others are programmatic where
[1:01:55]
programs or services that we offer may
[1:01:57]
need to be adjusted or changed or um
[1:02:00]
just other alternatives or accessibility
[1:02:03]
options need to be provided for those
[1:02:04]
things. And then there's the large ones
[1:02:06]
which are going to incr include capital
[1:02:08]
improvements may involve design um you
[1:02:12]
know future budgeting and may take a
[1:02:13]
longer time to implement those things.
[1:02:21]
So, as far as the plan that we have
[1:02:22]
here, parks and wreck, um I've included
[1:02:25]
their kind of documentation, they have
[1:02:27]
about a thousand items that were
[1:02:29]
identified in their parks, and that's
[1:02:30]
kind of appendex E, I believe. Um that
[1:02:33]
added about 60 pages to the document.
[1:02:35]
So, I chose not to add all of public
[1:02:36]
works. We have about 15,000 identified
[1:02:40]
issues, which would make this document
[1:02:41]
very long. Um but those those items in
[1:02:44]
that document um is maintained and we
[1:02:47]
assess that. Um but our transition plan
[1:02:50]
both for parks and wreck and and um
[1:02:53]
public works involve those kind of three
[1:02:55]
things working through with maintenance
[1:02:57]
capital projects and those are detailed
[1:02:59]
in the parks plan here and public works
[1:03:02]
will continue to update our plan um as
[1:03:04]
we move forward. What I have included
[1:03:06]
for public works is kind of a a 10-year
[1:03:09]
plan of what we have allocated for
[1:03:11]
budget and what we intend to fix with
[1:03:13]
that um each year.
[1:03:15]
>> And that's the table one. Correct. Okay.
[1:03:18]
And you have that Kevin, could you put
[1:03:20]
that on the screen? Table one.
[1:03:23]
>> No,
[1:03:27]
it's going to be page
[1:03:31]
12.
[1:03:32]
>> Thank you so much.
[1:03:34]
Okay, keep going, David. Sorry.
[1:03:36]
>> No.
[1:03:37]
>> Um, though we we feel like this is this
[1:03:40]
is and we feel that this is an important
[1:03:42]
plan to have in place both for legality
[1:03:44]
reasons, but also because we want to
[1:03:46]
make sure that our city is accessible to
[1:03:48]
everyone, right? We have a great city.
[1:03:50]
We have a lot of wonderful services and
[1:03:52]
facilities and we want to make sure that
[1:03:54]
everyone can participate uh equally
[1:03:55]
there. So going forward the most
[1:03:58]
important thing is that um once this is
[1:04:00]
in place this is a living document we
[1:04:02]
will revisit this every few years to
[1:04:05]
update um it is intended that this is
[1:04:08]
also including sections where it's like
[1:04:10]
hey here are the improvements we've done
[1:04:12]
to highlight you know the the gains and
[1:04:14]
the improvements that we've done. So
[1:04:16]
over the years we'll add and our intent
[1:04:19]
is over the next couple of months to
[1:04:20]
include the rest of the city as
[1:04:22]
evaluations are are performed and
[1:04:24]
finished um to kind of beef up this
[1:04:27]
document to include the whole city. Our
[1:04:29]
you know all of our programs and and
[1:04:31]
different departments that may have
[1:04:32]
barriers that are identified. Um if we
[1:04:35]
find things that aren't an issue, we'll
[1:04:37]
note that. Um, but this document will
[1:04:39]
live and breathe as we continue through
[1:04:41]
the city as our capital improvements and
[1:04:43]
maintenance upgrade our ADA compliance.
[1:04:46]
So, the goal is to meet compliance and
[1:04:49]
have everything fixed. Um, but I'm just
[1:04:51]
going to tell you with with public works
[1:04:52]
and our sidewalks, we'll never be there
[1:04:54]
because we may fix a thousand things and
[1:04:56]
a thousand will pop up again. So, this
[1:04:58]
will be something that we we work on
[1:05:00]
forever as a city to to slowly grow into
[1:05:04]
compliance. Um
[1:05:07]
so I think that um yeah and we recognize
[1:05:11]
that not every improvement can be
[1:05:13]
completed immediately. Not every
[1:05:14]
deficiency requires the same solution.
[1:05:16]
So ultimately this is more about
[1:05:18]
compliance. It is about ensuring that
[1:05:19]
residents and visitors with disabilities
[1:05:22]
have meaningful access to the city
[1:05:23]
program services, facilities and
[1:05:24]
recreational opportunities. And that is
[1:05:27]
all that I have for Thank you, David.
[1:05:29]
Councelor Bogdom,
[1:05:30]
>> I have a few questions. This one I know
[1:05:32]
you can answer. I'm hoping. Anyway, um
[1:05:35]
the one that I've heard is a big one is
[1:05:39]
Freedom Boulevard where it curves into
[1:05:41]
University Parkway.
[1:05:43]
>> Okay.
[1:05:44]
>> That corner that's on the souththeast.
[1:05:48]
There's absolutely nothing there. And
[1:05:50]
that's going from a collector or is that
[1:05:53]
Oh, that's a big road.
[1:05:55]
>> Is that right by Denny's?
[1:05:57]
>> Right. Yeah, just north of Denny's.
[1:05:58]
Right.
[1:05:59]
>> Right there. There's no It's just grass.
[1:06:01]
And so I think that was one thing that
[1:06:03]
was brought up that were from some of
[1:06:06]
our wheelchairs that like to travel
[1:06:08]
around that that's a really busy
[1:06:10]
intersection and there's no sidewalk
[1:06:12]
>> to keep them safe right there.
[1:06:14]
>> What is our long-term plan for that?
[1:06:16]
>> That's a great uh question. So kind of
[1:06:20]
into the details here with that, but
[1:06:21]
we've identified about 200 miles of
[1:06:24]
missing sidewalk within the city. And so
[1:06:26]
as needs come up, if those are are along
[1:06:30]
routes that are used by um individuals
[1:06:33]
with accessibility needs, those
[1:06:34]
obviously will bump up priority, but
[1:06:36]
those are always great to have feedback
[1:06:39]
and and give us. We've identified those
[1:06:41]
locations and where we have missing
[1:06:42]
sidewalk, but now it's just um
[1:06:45]
allocating those funds and and
[1:06:46]
programming that into our sidewalk
[1:06:48]
installation plan um to get those in.
[1:06:51]
>> So is that not in our 10-year CIP? Um,
[1:06:54]
in this plan, I don't include the CIP.
[1:06:56]
It's more of the maintenance stuff that
[1:06:58]
I've included here. Um, CIP is kind of a
[1:07:01]
year-to-year basis as we determine what
[1:07:03]
those needs are and where we're
[1:07:05]
installing new sidewalks. It also
[1:07:07]
depends on allocated funds. With the
[1:07:10]
500,000 that we have each year for
[1:07:11]
maintenance, that's what I've included
[1:07:13]
in this plan because that's something
[1:07:14]
that we've had um as a reliable source.
[1:07:17]
And so that's what I focused our kind of
[1:07:21]
transition piece that's included in this
[1:07:24]
on.
[1:07:24]
>> But we're also looking at chip hazards.
[1:07:26]
So even Yeah.
[1:07:27]
>> And that's included in the maintenance
[1:07:29]
here as well. Yeah.
[1:07:30]
>> Um and then a couple questions. I'm
[1:07:32]
unclear on where these parks are. It has
[1:07:36]
neighborhood. What is neighborhood?
[1:07:38]
>> Great question.
[1:07:40]
>> That's kind of what I was hoping parks
[1:07:42]
would be here for. First neighborhood
[1:07:43]
park is like
[1:07:45]
>> a very grand revenge park where I used
[1:07:48]
to live off
[1:07:49]
>> off of 300 South.
[1:07:50]
>> 300 South over
[1:07:52]
>> it's just like a corner.
[1:07:55]
>> So it's a real place and 300. It's just
[1:07:58]
like a corner lot with the mountains
[1:08:00]
next to that.
[1:08:02]
>> It's like if you go if you go if you go
[1:08:04]
>> and there's just a picnic table.
[1:08:06]
>> Yeah. If you go out if you go
[1:08:07]
>> on State Street in 900 East.
[1:08:09]
>> Yeah. 2100 also road
[1:08:12]
>> and what is roadside park
[1:08:15]
>> and these may be may be something we
[1:08:17]
need to update or include a map or
[1:08:19]
something but that's it may be no
[1:08:21]
include that parks uses internally or
[1:08:23]
something
[1:08:24]
>> there's still a lot of parks that I
[1:08:26]
>> as you mentioned I know
[1:08:30]
>> while you're checking Becky let's um go
[1:08:32]
with a couple of comments online Krice
[1:08:35]
would you like to go first and then
[1:08:36]
Rachel
[1:08:38]
>> yeah I just had a question for Brian Um,
[1:08:40]
I'm glad we're doing this. It's It is
[1:08:42]
overwhelming and I'm just wondering
[1:08:44]
legally thinking about the financial
[1:08:48]
aspect. So, financially legally what is
[1:08:51]
required
[1:08:53]
so we can know financially if this is
[1:08:56]
going to doom us or not.
[1:08:59]
>> Oh, go ahead. Sorry. Secondly, I'm also
[1:09:02]
wondering legally
[1:09:04]
like
[1:09:06]
for example, does this mean we couldn't
[1:09:07]
teach a skateboarding class at the rec
[1:09:10]
center because everyone couldn't do a
[1:09:12]
skateboarding class? Like I'm just
[1:09:13]
wondering legally does this limit us
[1:09:15]
that nothing can be done that everyone
[1:09:18]
couldn't participate in. So I'm
[1:09:20]
wondering about both those things.
[1:09:22]
>> Yeah. So I'll answer the second one
[1:09:24]
first which no I mean two things. One is
[1:09:28]
this plan doesn't limit us in any ways
[1:09:32]
that the law doesn't already limit us. I
[1:09:34]
mean the the federal ADA law is already
[1:09:36]
in place already binds us. This is
[1:09:38]
actually a plan for how to come into
[1:09:40]
compliance. And so
[1:09:44]
uh so it's not imposing restrictions on
[1:09:47]
us that don't already exist anyway. It's
[1:09:49]
a presentation of how we're going to
[1:09:51]
handle those restrictions. Secondly,
[1:09:54]
with regard to your uh question about um
[1:09:58]
uh the the programming, no, we're not
[1:10:02]
required necessarily to um inherently
[1:10:06]
automatically. We don't have to make a
[1:10:08]
an upfront decision that we can't do
[1:10:10]
programs because somebody might not be
[1:10:12]
able to participate. What in it's the reverse though is that if we are
[1:10:17]
offering a program and somebody wants to
[1:10:20]
be able to participate who can't
[1:10:22]
participate in the form we are offering
[1:10:24]
it then there's a process by which they
[1:10:26]
can request accommodations and we have
[1:10:28]
to consider those but they have but and
[1:10:31]
then there's all kinds of legal
[1:10:32]
requirements about whether they're
[1:10:34]
reasonable and that can involve cost and specificity and and who who the
[1:10:40]
person is and stuff. There's a long
[1:10:42]
process that we would go through to
[1:10:44]
determine whether we had to make a
[1:10:46]
change or not. But it's not just that we
[1:10:48]
have to make a change no matter what.
[1:10:50]
It's just that people can ask for it.
[1:10:51]
Then we have to consider how to do it.
[1:10:54]
Um with regard to the monetary uh um
[1:10:59]
implications, again, there's nothing
[1:11:02]
about this plan that's not addressing
[1:11:04]
something that we're not already
[1:11:05]
required to do. So, at some point the
[1:11:07]
money is going to be spent, but there's
[1:11:08]
also nothing about the law that says you
[1:11:11]
have to do it all tomorrow. So, so this
[1:11:14]
is ex uh exactly when you're going to do
[1:11:17]
it. The the real um I guess the the the
[1:11:22]
real basic answer to your question is
[1:11:24]
what the law really requires is that we
[1:11:26]
have the plan. We're actually subject to
[1:11:29]
significant
[1:11:31]
fines for not having the plan. So, if
[1:11:34]
you're worried about money, the worst
[1:11:35]
thing is not having the plan.
[1:11:37]
>> Oh, [laughter]
[1:11:38]
that's great. Thanks for that. That
[1:11:40]
explains everything for me.
[1:11:43]
>> Councelor Whipple.
[1:11:46]
>> Yes. I was so happy to see this. Um, one
[1:11:49]
of my neighbors that I care for very
[1:11:51]
much is in a wheelchair and we have old
[1:11:55]
sidewalks that have uplift and gaps and
[1:11:59]
holes and this really affects her
[1:12:02]
ability to move through our
[1:12:03]
neighborhood. Um, and I became acutely
[1:12:07]
aware of that when I was campaigning the
[1:12:09]
first time on one of those stupid little
[1:12:10]
knee scooters. and you feel every variation in the sidewalk and it
[1:12:18]
can be a real problem. I know that we
[1:12:21]
did this survey a couple of years ago
[1:12:23]
just because I think until that point we
[1:12:26]
didn't have a good handle on how many
[1:12:28]
miles of sidewalks we had, what
[1:12:30]
condition they were in. And my
[1:12:33]
understanding was when that initial
[1:12:36]
report which is is used in this was
[1:12:38]
given to us um it became
[1:12:42]
like just depressingly clear that the
[1:12:45]
$500,000 a year for this modification
[1:12:49]
repair and trip hazard was going to be
[1:12:51]
really inadequate to addressing the
[1:12:55]
existing problems especially when that
[1:12:58]
wasn't actually taking into account the
[1:13:00]
new sidewalks that need to be built.
[1:13:02]
like counselor Bogdton brought up, you
[1:13:04]
know, the missing one by what Boxfield
[1:13:07]
and and everything else. So, I'm really
[1:13:10]
happy to see that we have a clear plan
[1:13:13]
and accountability to address these
[1:13:16]
issues. I think this will will do a lot
[1:13:19]
to help make our community better. And
[1:13:24]
I'm also I mean even though I want it
[1:13:27]
done really like sooner rather than
[1:13:29]
later, I'm really grateful that there's
[1:13:31]
not a deadline so that we can chip away
[1:13:34]
at it in a fiscally responsible way
[1:13:37]
instead of, you know, having to mortgage
[1:13:39]
the house in order to get this little
[1:13:41]
improvement done. Thank you.
[1:13:45]
>> Thank you, councelor Whipple. Councelor
[1:13:47]
Bogman, did you find your other
[1:13:48]
reference? Did you have other questions
[1:13:50]
on other parks? I got a text from a resident and she was asking about
[1:13:56]
the Fox thing as well and I told her
[1:13:58]
that was a conversation we have with the
[1:14:00]
school board that was their
[1:14:02]
responsibility to put in and they
[1:14:03]
lowered on that portion.
[1:14:05]
>> So yeah, I I got that.
[1:14:07]
>> Okay, great. Thank you, Councelor
[1:14:08]
Whitlock.
[1:14:10]
>> So another question for you which I
[1:14:13]
think you've fairly answered but I just
[1:14:14]
want to poke on it a little bit. So
[1:14:17]
based on my math, our the identified
[1:14:21]
backlog and the rate at which we're
[1:14:22]
improving is 33 years or some arrest
[1:14:24]
which is pretty large. Is putting that
[1:14:27]
in writing is that not exposing us to
[1:14:30]
legal risk as having an unreasonable
[1:14:32]
plan if there is some sort of issue.
[1:14:37]
>> Um
[1:14:38]
less risk than not putting them in
[1:14:40]
writing.
[1:14:41]
>> Um be again because what they really
[1:14:44]
look at is whether you have a plan or
[1:14:45]
not. Now, could DOJ come in and do a
[1:14:48]
review and say your plan's unreasonable?
[1:14:51]
Sure. But that would be a collaborative
[1:14:54]
process. Okay.
[1:14:55]
>> Whereby we would end where we would work
[1:14:57]
together to fix the plan rather than
[1:14:59]
just getting in trouble for not having
[1:15:01]
one,
[1:15:02]
>> which is more black and white. Does that
[1:15:03]
make sense?
[1:15:04]
>> Yeah, that makes sense. Thank you for
[1:15:05]
clarifying. I have a couple more
[1:15:06]
questions. Um, so
[1:15:10]
actually a comment just there's a
[1:15:13]
discrepancy on the email address in the
[1:15:15]
packet. We misspelled accessibility.
[1:15:17]
It's spelled with an A, not an I. Just
[1:15:20]
as a something to clean up before we
[1:15:21]
finalize and send the plan. Also had a
[1:15:24]
question about seemingly a couple number
[1:15:26]
discrepancies that I noticed. Um on page
[1:15:30]
11 of the plan 85 packet
[1:15:33]
it says there are um
[1:15:37]
uh
[1:15:39]
321
[1:15:41]
so sorry 3,121 meet current ADA
[1:15:44]
accessibility standards and then just
[1:15:45]
under cuss cost summary it says 3,393
[1:15:50]
met ADA accessibility requirements. So,
[1:15:51]
I didn't really understand why there was
[1:15:53]
that discrepancy. And then there's a
[1:15:55]
similar discrepancy with the total
[1:15:56]
number of ramps.
[1:15:59]
>> I see that
[1:16:02]
um it may just have been updated at
[1:16:04]
different times um as we've gone through
[1:16:06]
and identified additional locations. We
[1:16:08]
may not have just carried those numbers
[1:16:10]
through.
[1:16:10]
>> Okay. Well, I'd encourage us to be
[1:16:12]
consistent before we finalize this. And
[1:16:14]
then the other thing that I was going to
[1:16:16]
point out is it says there's no fiscal
[1:16:17]
impact but yet it commits us to a
[1:16:19]
certain uh spending requirement all
[1:16:21]
this. So I'm I'm wondering why it says
[1:16:23]
that. Is it because essentially we've
[1:16:25]
already appropriated these monies in
[1:16:26]
other areas and so there's no net
[1:16:28]
marginal incremental. Could you just
[1:16:30]
explain that a little bit? Um, right. I
[1:16:32]
because at least for public works, what
[1:16:35]
I'm showing here with domain and
[1:16:36]
schedule, um, because those have already
[1:16:39]
been appropriated, they're not
[1:16:40]
increasing any funds. Like this plan's
[1:16:42]
not, um, requesting funds for at least
[1:16:45]
public works or anything like that,
[1:16:47]
right? We're just saying, hey, with the
[1:16:48]
funds that have been allocated for this
[1:16:50]
area of um, ADA compliance,
[1:16:54]
this is what we're planning on doing. So
[1:16:56]
there isn't any impact necessarily
[1:16:58]
additionally than what RER is
[1:17:00]
established.
[1:17:01]
>> Okay, that makes sense. Thank you.
[1:17:05]
>> Okay. [clears throat]
[1:17:06]
I I had the same reaction that Katrice
[1:17:08]
did. I felt very overwhelmed at first at
[1:17:11]
the enormity of cost and the number of
[1:17:14]
projects. Um but also where ADA was
[1:17:18]
enacted in 1990 and then amended in
[1:17:21]
2009.
[1:17:22]
Um I was confused about but I think
[1:17:25]
Brian has clarified
[1:17:28]
the direction is that we have a plan not
[1:17:32]
that they be completed within it just
[1:17:34]
has to be a reasonable plan. So we've
[1:17:36]
had a plan right this isn't a new plan.
[1:17:39]
This is formalizing this is this is
[1:17:41]
taking a formal step to we we've you
[1:17:44]
know public works and parks both have
[1:17:46]
been working not only on these plans but
[1:17:48]
actually working off of them for quite
[1:17:50]
some time. We're formalizing that this
[1:17:54]
is the citywide plan and then we're
[1:17:57]
gonna actually update it. So, this isn't
[1:18:00]
the intended to be the end of the
[1:18:02]
process. This is a
[1:18:03]
>> we're we're setting what the base level
[1:18:06]
is so that we can work on those.
[1:18:07]
>> We'll see. Great. Thank you, Brian. Any
[1:18:10]
other questions?
[1:18:12]
So, Gary, I do know this is true because
[1:18:15]
when we raised money
[1:18:17]
for um the neighborhood program project
[1:18:20]
that I did for the Lakewood Park, I had
[1:18:24]
them move our playground equipment
[1:18:25]
because it was underneath the high
[1:18:27]
voltage power lines that was making the
[1:18:28]
kids get kids skin vibrate. It was just
[1:18:31]
awful.
[1:18:31]
>> And when we did that, part of the
[1:18:34]
expense had to be must have to be we had
[1:18:37]
to have ADA access to the play.
[1:18:40]
>> Interesting. So, and this was back in
[1:18:42]
like 17. So, parks has been working on
[1:18:45]
this. I do know that they've been
[1:18:47]
working on it because when they redid
[1:18:49]
Fifth West, when they put it through all
[1:18:50]
the way to the Parkway, there was a
[1:18:52]
bunch of ADA ramps added at that point
[1:18:54]
in time.
[1:18:55]
>> Okay.
[1:18:56]
>> And then a bunch of residents saw that
[1:18:58]
and got together and said, "Okay, how
[1:19:00]
much will it cost us for sidewalk?" And
[1:19:01]
the city paired with them to put
[1:19:03]
sidewalk in front of their homes. So,
[1:19:04]
this has been worked on at least for the
[1:19:06]
last
[1:19:08]
>> 94.
[1:19:08]
>> Yes, Mayor Jkins. Thank you, Becky.
[1:19:10]
>> Yes. And but every department has to
[1:19:12]
have
[1:19:14]
>> Oh,
[1:19:14]
>> so it's not just parks, public works,
[1:19:18]
but every department needs to contribute
[1:19:21]
to this plan. So maybe they have plans,
[1:19:24]
maybe they don't.
[1:19:25]
>> Yeah. Okay.
[1:19:29]
» But we definitely have a lot of work to
[1:19:32]
do to actually [clears throat]
[1:19:35]
>> Okay. Thank you, Mayor, and thank you
[1:19:37]
again, David, for your presentation.
[1:19:38]
This is on our agenda for tonight. Okay.
[1:19:41]
>> So, thank you. All right. Next, we have
[1:19:44]
a um if I assume Cody's nearby.
[1:19:50]
If not, we'll take a break.
[1:19:52]
>> He's right here.
[1:19:53]
>> Okay. Next, we have a resolution
[1:19:55]
approving the appropriation of $14,1711
[1:20:00]
in the general fund for a contractual
[1:20:03]
sales tax increment post performance
[1:20:05]
payment to today's market. presented by
[1:20:07]
economic development division director
[1:20:09]
Cody Hill. Welcome Cody.
[1:20:11]
>> Thank you. I appreciate it. Thank you
[1:20:14]
all for your time.
[1:20:16]
>> Yeah. So, we have a um a budget request
[1:20:21]
for an appropriation for this sales tax
[1:20:24]
increment payment. Um, this was back in
[1:20:27]
2019 that the city made this entered
[1:20:30]
into this agreement with Days Market
[1:20:32]
whereby they would make improvements to
[1:20:35]
their store location on Canyon and in
[1:20:37]
exchange the city would remit a certain
[1:20:39]
amount of um sales tax increment to
[1:20:43]
them. Based on our calculations, the
[1:20:46]
amount that they are going that are that
[1:20:48]
they are able to receive this year is
[1:20:51]
$14,1711.
[1:20:54]
And in looking at their total, what they
[1:20:59]
have acred, it looks like that they will
[1:21:01]
meet their $100,000 cap next year um
[1:21:05]
after receiving 8,000. And so that would
[1:21:07]
be two and a half years early that they
[1:21:09]
will have hit their cap. And once they
[1:21:12]
do hit their cap, then the agreement
[1:21:14]
will have expired.
[1:21:15]
>> And when adjusting for inflation, um, so
[1:21:19]
the cap amount on this, I'm not sure if
[1:21:21]
I have that here. Yeah. So the cap
[1:21:22]
amount on this is, um, or sorry, the
[1:21:26]
base amount is $39,800.
[1:21:29]
When adjusting for inflation, it's about
[1:21:31]
51,000. And so the difference between
[1:21:33]
the 107,000 which is the total generated
[1:21:37]
by today's market uh the last 12 months
[1:21:39]
and that adjusted for inflation base
[1:21:42]
amount it's an increase of 111%.
[1:21:45]
So um very considerable increase in the sales tax revenue that day market is
[1:21:52]
generating um after having made those
[1:21:54]
improvements.
[1:21:56]
And this just kind of shows the shows
[1:21:59]
the um historic amounts of of sales tax
[1:22:03]
revenues that we've received from
[1:22:04]
today's market since um this agreement
[1:22:07]
began in 2019 to 2020 that that year and
[1:22:11]
you definitely see the weird COVID
[1:22:14]
happening 2020 when there's a lot less
[1:22:16]
revenue 2021 when there's stimulus money
[1:22:18]
and everyone got a lot more. Um, but it
[1:22:21]
really is tracking at about um 106
[1:22:23]
107,000 is is where it's stabilizing.
[1:22:27]
And so
[1:22:29]
>> questions for Cody.
[1:22:31]
this is one of like four
[1:22:34]
arrangements like this that we have in
[1:22:36]
the city, right? I guess they come up at
[1:22:38]
different times of the year.
[1:22:39]
>> Yes.
[1:22:40]
>> Okay.
[1:22:40]
>> Yeah. So, there are four. This one has
[1:22:43]
three years left, but like I said, I
[1:22:44]
anticipate that they will get that um
[1:22:47]
$8,000 payment next year and then it
[1:22:49]
will sunset and then we'll have three
[1:22:51]
left. And then there's also the um two
[1:22:55]
other agreements that end in about three
[1:22:58]
and then four years. And then Riverwoods
[1:23:00]
is the other one and that ends in eight
[1:23:02]
years.
[1:23:02]
>> Okay.
[1:23:02]
>> So, that one will be a long uh a little
[1:23:04]
bit longer and they're not looking close
[1:23:06]
to hitting their cap amount. So,
[1:23:08]
>> and am I remembering that this is that
[1:23:10]
tool that has expired that we can no
[1:23:12]
longer
[1:23:14]
enter into,
[1:23:15]
>> right?
[1:23:15]
>> Okay.
[1:23:15]
>> Yeah. As a city.
[1:23:17]
>> Okay.
[1:23:17]
>> Correct.
[1:23:18]
>> Other questions?
[1:23:20]
>> I just have a comment. I think
[1:23:21]
>> councelor Ba
[1:23:22]
>> I think this shows the love of the
[1:23:24]
northeast side for days market because
[1:23:26]
that's amazing.
[1:23:27]
>> Yeah. Yeah.
[1:23:30]
Councelor Hoben,
[1:23:31]
>> it is the best ever.
[1:23:36]
See the love of the things,
[1:23:38]
>> says the person who lives a mile away.
[1:23:41]
Um,
[1:23:42]
>> can you help me understand what how do
[1:23:44]
we factor in inflation into these
[1:23:46]
calculations? Do we do adjustments for
[1:23:49]
inflation
[1:23:50]
>> or were you just mentioning that as a
[1:23:51]
side note?
[1:23:52]
>> It's not part of the agreement. I I I
[1:23:54]
provide that as contextual information
[1:23:55]
so that you can see how um successful or unsuccessful a business is doing when
[1:24:00]
accounting for inflation.
[1:24:02]
>> Yeah.
[1:24:03]
>> Okay. Thank you.
[1:24:04]
>> Yes. Thank you, Cody. This will also be
[1:24:07]
on our agenda for tonight. Thank you.
[1:24:09]
>> Thank you.
[1:24:10]
>> All right. We'll now take a break and
[1:24:14]
we'll reconvene at uh in 13 minutes at
[1:24:17]
110.
[1:24:21]
» Precisely.
[1:24:27]
» Recording stopped. Recording in
[1:24:30]
progress.
[1:24:32]
>> Thank you, Kevin. Okay, we'll we'll
[1:24:35]
[clears throat] begin again our work
[1:24:37]
session. Our next item number five is an
[1:24:40]
ordinance amending the zone map
[1:24:42]
classification of real property
[1:24:44]
generally located at 1804 North Geneva
[1:24:47]
Road from one family residential zone to
[1:24:49]
the SDA or specific development plan in
[1:24:54]
the Lake View Fields area zone in the
[1:24:57]
Lake View North neighborhood. Presented
[1:24:59]
by city planner Dustin Wright.
[1:25:01]
>> Welcome Dustin. Yeah, thank you very
[1:25:03]
much. So, take a look here. This is the
[1:25:06]
property that the applicant is uh asking
[1:25:08]
to be reszoned. It's just off a Geneva
[1:25:11]
Road there. It's about a 10 acre parcel
[1:25:13]
of land. And
[1:25:17]
here's the proposal they're looking to
[1:25:19]
do. Highlighted here in red is their
[1:25:21]
property. Um so, it's a single family
[1:25:24]
residential proposal there. about 33 34
[1:25:30]
um lots. And as you can see the there's
[1:25:34]
a property in between that'll be coming
[1:25:37]
uh before you in the near future as well
[1:25:40]
for the same uh reszone. And then um
[1:25:45]
just on the north there that uh
[1:25:46]
subdivision that's been in um all this
[1:25:49]
is is part of the um
[1:25:54]
so I don't know what happened there.
[1:25:57]
right there. So, you can see over there
[1:25:59]
on the right hand side, that's our
[1:26:00]
general plan map. There's an appendix uh
[1:26:03]
for the Lake View Fields
[1:26:06]
um area um plan. So, so this will kind
[1:26:10]
of it follows a little bit of a
[1:26:12]
different uh street layout, but it's
[1:26:13]
still that same single family
[1:26:15]
residential lots. And so, um this is
[1:26:19]
what they're looking to um amend to and planning commission's forward.
[1:26:24]
positive recommendation to you. Are
[1:26:26]
there any questions for me on this one?
[1:26:29]
>> So, Dustin, the um I know the planning
[1:26:32]
commission
[1:26:34]
had recommended approval
[1:26:37]
um with the condition that some could
[1:26:39]
you go back to the previous drawing that
[1:26:41]
some path in be included or what what
[1:26:43]
was that? Yeah, I think um so if you can
[1:26:47]
see
[1:26:48]
here, there's a
[1:26:50]
>> there was going to be a stub road to the maze property below.
[1:26:54]
>> Uhu.
[1:26:55]
>> Um the the maze don't want that stub
[1:26:59]
there. So um they're looking to to get
[1:27:03]
rid of that stub. I think the planning
[1:27:05]
commission was uh describing having a a
[1:27:07]
pedestrian
[1:27:09]
>> connection. I don't think
[1:27:10]
>> pedestrian instead of a road.
[1:27:13]
>> Yeah. And I don't think it was going to
[1:27:15]
be here. I think originally there was
[1:27:17]
another step road coming to the church
[1:27:19]
property there.
[1:27:20]
>> Okay.
[1:27:21]
>> Um so if a church were to go in there,
[1:27:23]
then then maybe that would make sense to
[1:27:25]
have a pedestrian connection.
[1:27:26]
>> Okay.
[1:27:27]
>> To that. So
[1:27:28]
>> church took it out.
[1:27:29]
>> Councelor Bogden,
[1:27:31]
>> the church is out. They took it out,
[1:27:32]
right? And I don't think Ben would
[1:27:34]
appreciate a I know Ben. I don't think
[1:27:37]
he'd appreciate a walkway if he doesn't
[1:27:38]
want a stubbed road. Now, I haven't
[1:27:41]
asked him for sure, but I don't think
[1:27:42]
he'd appreciate people on his property.
[1:27:44]
So, he owns the property just right up
[1:27:47]
against this, and his brother owns the
[1:27:48]
one just right below it. Right. So, who did the
[1:27:54]
um drawing, the rendering? That's
[1:27:55]
probably one before that has Ben's
[1:27:57]
property and his brother's property in
[1:27:59]
that.
[1:28:00]
Is that just what it could be?
[1:28:04]
>> Yeah, that one. Who did that one? So
[1:28:07]
that's part of the appendix in the
[1:28:08]
general plans that was done when that uh
[1:28:11]
was created the SDP4 zone. Um
[1:28:17]
>> do the owners know that this was done on
[1:28:20]
top of their property?
[1:28:23]
>> Yes, that was done years ago when the
[1:28:25]
general plan appendix was put in there
[1:28:27]
and it was just trying to more convey
[1:28:29]
housing densities and lot types rather
[1:28:31]
than actual road configuration.
[1:28:34]
So [snorts] we think it's very
[1:28:35]
consistent with that because the lot
[1:28:38]
sizes are what we were looking for. In
[1:28:41]
fact, this is better than what we've
[1:28:42]
been getting in recent subdivisions.
[1:28:44]
These are 8 to 10,000 square foot lots.
[1:28:46]
You know how many 6,000 square foot lots
[1:28:48]
we've been getting lately. So that feels
[1:28:51]
good that they're following the intent
[1:28:53]
of that map and the plan. So, the SD4
[1:28:57]
zone is these 8,500 foot lots because I
[1:29:00]
know when I did discuss it with the
[1:29:02]
neighbors, they weren't happy, but they
[1:29:05]
were okay that because they they say
[1:29:08]
they've always told me for the last 10
[1:29:10]
years that they have an understanding
[1:29:12]
that they should have like the R120 cat.
[1:29:16]
And so this was acceptable to themish
[1:29:21]
as long as it doesn't go below that
[1:29:23]
8,500T
[1:29:24]
lot. It so that's in stone. It wouldn't
[1:29:28]
go to 6,000 or 7,000 foot less.
[1:29:31]
>> Yeah, that's that's the minimum in that
[1:29:34]
uh SDP4 zone that they're requesting. So
[1:29:36]
if they wanted to go below that, they'd
[1:29:37]
have to come back and reszone it to R16.
[1:29:40]
>> And the church has been gone for years.
[1:29:41]
There's no church there on the corner.
[1:29:43]
The church owns the property, but
[1:29:44]
there's no church on the corner. Um, so
[1:29:47]
>> they still own the property.
[1:29:49]
>> I if it has church and I believe they
[1:29:51]
do. We can look at Do we can we do a
[1:29:54]
quick partial look up?
[1:29:57]
>> Is going to do a quick partial just
[1:30:00]
saying
[1:30:03]
» if there should be a church there in the
[1:30:05]
future, a walk away would make sense.
[1:30:07]
>> I don't know that there will because
[1:30:08]
they took one out, right? Um, so I'm
[1:30:12]
okay with not having a stubbed off road
[1:30:14]
and I'm okay with not having a walkway.
[1:30:16]
I I think if Ben is okay not having a
[1:30:19]
stepped off road, he's okay not having I
[1:30:21]
wouldn't want people on my property
[1:30:22]
trespassing because there's a walkway,
[1:30:24]
which is going to enhance, right?
[1:30:29]
>> Thank you, councelor Bogden. Um, other
[1:30:31]
questions for Dustin. And I'll mention
[1:30:34]
that we've been joined online by
[1:30:35]
councelor Craig Christensen as well.
[1:30:38]
Other questions for Dustin?
[1:30:43]
Okay. Thank you, Dustin. We'll see you
[1:30:45]
tonight. This is on our agenda for
[1:30:47]
tonight.
[1:30:48]
>> Thank you.
[1:30:51]
Next, we have an ordinance amending the
[1:30:54]
zone map classification of real property
[1:30:56]
generally located at 313 East 200 North
[1:31:01]
from residential conservation, the RC
[1:31:03]
zone to a highdensity residential zone
[1:31:06]
in the walking neighborhood. Also
[1:31:08]
presented by Dustin.
[1:31:14]
So, yeah, here's this property. It's a
[1:31:16]
halfacre,
[1:31:17]
two parcels. The applicant is looking to
[1:31:20]
demolish those uh home, single family
[1:31:22]
home and a triplex and build a a 12unit
[1:31:26]
town home project here in the Wala
[1:31:28]
neighborhood.
[1:31:30]
Uh so it's currently zoned in the
[1:31:32]
residential conservation or RC zone. Uh
[1:31:36]
so that zone doesn't allow new lots or
[1:31:38]
parcels to be created. Uh so that's why
[1:31:40]
they're going through a reszone uh
[1:31:43]
process to um ask for the highdensity
[1:31:46]
residential zone, the HDR zone. Um
[1:31:51]
and here's their density. They're
[1:31:53]
proposing 27 units, and that zone allows
[1:31:57]
up to 50 units per acre.
[1:32:00]
Um, so years ago, part of our general
[1:32:02]
plan, um, we have a a neighborhood
[1:32:05]
specific plan for the Walke neighborhood
[1:32:08]
and the future land use map here is is
[1:32:12]
part of that plan. I'll just kind of
[1:32:14]
orient you here. So, here's the the
[1:32:16]
property that the applicants requesting
[1:32:18]
the reszone on. It's [clears throat]
[1:32:20]
down in that yellow area in the plan in
[1:32:23]
the WE plan. So that area is designated
[1:32:27]
as something that would remain as um
[1:32:30]
residential conservation. So they're
[1:32:32]
trying to preserve the single family
[1:32:34]
homes uh in that historic Pioneer
[1:32:37]
neighborhood there. And then the plan
[1:32:40]
was to put higher density
[1:32:43]
um near the the northern portion of the
[1:32:46]
neighborhood close to to Brigham Young
[1:32:48]
University's campus so that it's more of
[1:32:50]
a walkable uh student oriented um
[1:32:54]
location there. So, so that's why that
[1:32:57]
uh plan was kind of developed that way
[1:33:00]
to take development pressure off of the
[1:33:02]
rest of the neighborhood where where
[1:33:04]
these single family homes were getting a
[1:33:06]
lot of pressure to be um become student
[1:33:08]
housing and and uh lose that character
[1:33:11]
that's there. of the neighborhood, you
[1:33:13]
know, worked with staff and stakeholders
[1:33:15]
to create this plan to to help protect
[1:33:19]
um the neighborhood from that and to to
[1:33:21]
still allow for highdensity uh housing
[1:33:24]
to come into this to the neighborhood,
[1:33:26]
but to put it in the location that makes
[1:33:28]
the most sense there. So, it's kind of
[1:33:30]
an overview on
[1:33:34]
that. And then here is kind of a concept
[1:33:37]
of what they're proposing for those town
[1:33:39]
homes. to be 12 12 units. Uh
[1:33:43]
there and
[1:33:47]
some elevations here as well just shown
[1:33:50]
um
[1:33:52]
shown that. But anyway,
[1:33:56]
there they are. So, three stories,
[1:33:59]
parking on the main level, and then the living space above. So, any
[1:34:04]
questions on this one?
[1:34:09]
Yeah. No, sir.
[1:34:13]
>> Uh, yeah. I'm I'm curious.
[1:34:17]
I apologize if I if this was in the
[1:34:18]
packet, I missed it, but this home is
[1:34:20]
How old is this home again? It's like
[1:34:23]
It's quite old. Is it not correct?
[1:34:25]
>> 1906 or something.
[1:34:26]
>> 1906. Is there not like a historic uh
[1:34:31]
>> Yeah. designation in that area? Um, so
[1:34:35]
it is in the uh East Central Historic
[1:34:37]
District. Um, but that's a
[1:34:39]
>> but individual homeowners have to apply
[1:34:41]
to be part of it.
[1:34:42]
>> Um, so there so the the whole
[1:34:44]
neighborhood is part of the district.
[1:34:47]
Um, but it's an honorary district. It's
[1:34:49]
not protected by our landmarks chapter.
[1:34:52]
So they'd have to be on our landmarks
[1:34:53]
register. Got it.
[1:34:54]
>> The proy landmarks register for it to be
[1:34:56]
protected. So, um, while it's in a
[1:35:00]
historic district, it's not, uh,
[1:35:02]
protected from,
[1:35:04]
um,
[1:35:06]
being
[1:35:07]
>> redeveloped.
[1:35:08]
Yeah. Yeah. Okay. Thank you
[1:35:09]
for helping me understand that.
[1:35:11]
>> Hey, Gary.
[1:35:12]
>> Yes. Go ahead, Councelor Christensen.
[1:35:14]
>> So, just a quick question. Uh, Dustin,
[1:35:16]
how long ago was this plan put into
[1:35:18]
place?
[1:35:20]
>> Uh, the neighborhood plan,
[1:35:21]
>> the neighborhood plan was probably
[1:35:24]
2014.
[1:35:27]
I think 2000 right after
[1:35:30]
>> South Campus area master plan.
[1:35:32]
>> Yeah. The the Walke neighborhood plan
[1:35:33]
was uh 2014.
[1:35:36]
>> Okay.
[1:35:36]
>> Right in there. So
[1:35:38]
>> we got
[1:35:40]
>> Okay. Thank you.
[1:35:46]
» Councelor McCay.
[1:35:58]
Katrice, are you there?
[1:36:00]
>> So, my question is, they've only
[1:36:02]
profered one year of owner occupancy.
[1:36:07]
>> Um, they profered a year at planning
[1:36:09]
commission. I think she mentioned she'd
[1:36:11]
be comfortable with bumping that to two
[1:36:13]
years um as a deed restriction for for
[1:36:17]
those 12 units to be owner occupied.
[1:36:20]
Um,
[1:36:21]
>> okay. Without it being perpetually owner
[1:36:24]
occupied and always ownership with no
[1:36:27]
rentals long term forever, I'm not open
[1:36:30]
to it because the whole problem is that
[1:36:35]
the investors I mean investors are just
[1:36:38]
upping all the prices and the only way
[1:36:39]
for it to stay more accessible is to be
[1:36:42]
owner occupied where the prices aren't
[1:36:44]
inflated by investors.
[1:36:46]
And um and if we're going to go against
[1:36:48]
the neighborhood plan, which was
[1:36:52]
put in very seriously with a lot of time
[1:36:54]
and consideration, and people are very
[1:36:56]
invested in it, I'm not willing to
[1:36:57]
change anything without making it better
[1:37:00]
all around, which I believe only owner
[1:37:03]
occupancy
[1:37:05]
in perpetuity achieve that.
[1:37:11]
So Justin, that was the extent to which
[1:37:13]
they were willing to offer go from one
[1:37:15]
year to two years. There was no talk
[1:37:16]
about perpetuity for owner occupancy.
[1:37:20]
>> Um, not that I recall. I think she
[1:37:22]
mentioned that, but that could be
[1:37:23]
something you could discuss with her.
[1:37:25]
Okay. Tonight, um, the other thing to
[1:37:28]
mention is they did talk about a
[1:37:29]
development agreement to cap the uh,
[1:37:33]
density um because the HDR zone that
[1:37:37]
they're requesting allows up to 50 and
[1:37:38]
they were
[1:37:40]
>> um, at 27, I think. So
[1:37:42]
>> that and the building height, they're
[1:37:44]
willing to put those into a development
[1:37:46]
agreement as well.
[1:37:47]
>> So what's medium density?
[1:37:49]
>> Uh 30 units. Yeah. And the reason that
[1:37:52]
they're asking for HDR as opposed to MDR
[1:37:55]
or medium density residential um was
[1:37:58]
mostly for the setbacks so that they can
[1:38:01]
get this project to fit on that side.
[1:38:03]
>> I see. Okay. Councelor Whitlock.
[1:38:06]
So uh in this packet um it says that
[1:38:11]
engineering review comment for this
[1:38:13]
development reads our existing utilities
[1:38:14]
cannot handle proposed HTR development.
[1:38:18]
My question is is this yeah it's it's is
[1:38:23]
it unusual for us to be asked to grant a
[1:38:25]
zone change before we know whether the
[1:38:27]
site can be served and how or am I
[1:38:29]
misunderstanding the packet?
[1:38:31]
>> Yeah. So when when we create these u
[1:38:34]
general plans, the um public works is
[1:38:37]
looking at those as far as um making
[1:38:39]
sure they have capacity to to meet the
[1:38:41]
needs of that plan. Um and so where this
[1:38:44]
plan doesn't show higher density going
[1:38:46]
in that area, they haven't planned and prepared for that. So I think that's
[1:38:50]
where that comment's coming. So it's not
[1:38:52]
saying that this particular project will
[1:38:54]
create problems. It's saying that if
[1:38:56]
this project creates a precedence for
[1:38:58]
higher density, we will need to then
[1:38:59]
plan for additionals infrastructure.
[1:39:02]
>> Um, not 100% sure if that's accurate or
[1:39:04]
if it's saying that they will have to do
[1:39:07]
some upgrading on the site to to make
[1:39:09]
that work.
[1:39:12]
>> Mayor,
[1:39:13]
>> thank you. I don't mean to speak for
[1:39:15]
public works, but I've been in some
[1:39:17]
meetings that where they've talked about
[1:39:18]
different things like this. So, correct
[1:39:19]
me if I'm wrong, but um sometimes is
[1:39:22]
they have a certain number of sewer
[1:39:24]
lines that they are able to approve in a year or something like that and
[1:39:29]
they're all approved out. And so then
[1:39:32]
when a development comes in and they
[1:39:33]
say, "I need this many x amount."
[1:39:35]
They're like, "Well, we already have all
[1:39:36]
those like we don't have that capacity
[1:39:39]
yet." And and so that can be part of it.
[1:39:42]
could get public works here so that they
[1:39:44]
can answer these questions if you want
[1:39:45]
to because I don't want to just kind of
[1:39:47]
guess what it might be unless you have a
[1:39:49]
better
[1:39:50]
>> I agree with Jeff. Yes, that needs to be
[1:39:52]
addressed before we can make a decision.
[1:39:53]
Do
[1:39:53]
>> you want me to get
[1:39:54]
>> No, I think that's uh that's a good
[1:39:56]
point. Um it's like I said, yeah,
[1:39:59]
they're looking at that that general
[1:40:00]
plan and and what they're anticipating
[1:40:02]
as what they can cover. Um would they be
[1:40:06]
able to cover this? I guess I shouldn't
[1:40:08]
speak for him, but um so if we can get
[1:40:12]
them to to maybe answer that tonight.
[1:40:13]
>> I I have another question. So the
[1:40:16]
applicant said that the HDR is needed
[1:40:18]
for its setbacks, not necessarily
[1:40:20]
density. But it's interesting because
[1:40:21]
I've talked to a few residents in this
[1:40:24]
area who actually said, I feel like if
[1:40:25]
we didn't have these setbacks, then we
[1:40:27]
could actually fit in detached smaller
[1:40:30]
single family homes like a cottage
[1:40:32]
neighborhood or something, which I think
[1:40:33]
the neighborhood would be much more
[1:40:34]
amendable to. I'm just curious from a
[1:40:37]
planning perspective, is the setback
[1:40:38]
serving us here? Is it actually harming
[1:40:40]
us and giving us a work or worse product
[1:40:43]
>> in the HDR zone?
[1:40:46]
>> In this area, walking area.
[1:40:47]
>> Yeah, probably the walking area.
[1:40:49]
>> Um,
[1:40:49]
>> in this particular case, because my
[1:40:51]
understanding is the reason why
[1:40:53]
according to the applicant was saying we
[1:40:55]
have to do it like this because the
[1:40:56]
setbacks forces us to go more dense.
[1:40:59]
>> So the the medium density residential
[1:41:02]
setback is 20 ft. So they would have to
[1:41:04]
push the building back 20 feet, which
[1:41:06]
would then limit how much they'd be able
[1:41:08]
to develop on the site and and meet the
[1:41:10]
parking requirements. The HDR zone
[1:41:13]
allows it to to I think be a 10-ft
[1:41:16]
setback. So that gives them that
[1:41:18]
flexibility to to be able to fit more on
[1:41:20]
the site.
[1:41:22]
>> Yeah. My point is if we had a like a
[1:41:25]
option to have less setbacks, then you
[1:41:28]
could have a viable MBR project here,
[1:41:30]
which is what the neighborhood would
[1:41:31]
want more. for that not a reasonable
[1:41:32]
thing to conclude.
[1:41:34]
>> Um I don't know that the neighborhood
[1:41:35]
would want that more. We've heard quite
[1:41:37]
a bit that
[1:41:38]
>> Well, ignore the neighborhood part.
[1:41:39]
That's a judgment based on the council.
[1:41:40]
I'm just saying like do you think that like from your understanding the
[1:41:44]
applicant if they had had smaller
[1:41:46]
setbacks that they would have looked at
[1:41:47]
another concept potentially
[1:41:50]
>> um
[1:41:52]
like if the if the medium density zone
[1:41:54]
>> say MDR had 10 foot setbacks or 5 foot
[1:41:56]
or there was some way there was some way
[1:41:58]
like if you meet certain requirements
[1:41:59]
there could be an exemption to the
[1:42:00]
setback. Yeah. Then they would have
[1:42:01]
asked for the medium density at that
[1:42:03]
point. It'd still be the same project.
[1:42:05]
It just be a different ask.
[1:42:07]
>> Okay.
[1:42:07]
>> But we'd still end up with that same
[1:42:09]
thing. So that's why the um ask is for
[1:42:12]
the the high density, but the deed
[1:42:14]
restriction would limit the density and
[1:42:17]
the height just because the HDR could
[1:42:19]
>> because they could actually go a lot
[1:42:20]
more dense than this with this zone.
[1:42:23]
>> Yeah. If it were reszoned HDR and didn't
[1:42:25]
have that, then they could come in with
[1:42:26]
a new project plan showing something
[1:42:29]
completely different than this concept
[1:42:31]
plan.
[1:42:32]
>> Thank you.
[1:42:34]
Councelor Whitlock. Councelor
[1:42:36]
Rachel.
[1:42:38]
>> Yes. Um, this is an interesting one
[1:42:40]
because this is my area. I've watched
[1:42:42]
this project change multiple times over
[1:42:44]
the years and it's given me a lot of
[1:42:47]
thought about the residential
[1:42:49]
conservation zone.
[1:42:51]
This zone was put in place what like 25
[1:42:54]
26 years ago because of the degregation
[1:42:59]
to these historic pioneer neighborhoods
[1:43:01]
and it froze everything in place. So we
[1:43:04]
have apartments next to duplexes next to
[1:43:06]
single family homes. Um, but it leads to
[1:43:10]
a lot of confusion for people who are in
[1:43:12]
the area because looking at a house, you
[1:43:15]
don't know if that house is a duplex or
[1:43:17]
a triplex or a single family residence
[1:43:20]
and looking up the zoning for it doesn't
[1:43:23]
tell you either. It's whatever the use
[1:43:25]
was or whatever the use had been legally
[1:43:28]
established was at the time that the RC
[1:43:31]
zone kind of froze everything in amber.
[1:43:34]
But one of the problems we have with the
[1:43:36]
RC zone is other than the confusion is
[1:43:40]
it doesn't allow for
[1:43:43]
new growth or change or creativity.
[1:43:48]
People are forced to keep that same
[1:43:50]
density for whatever they had. So there
[1:43:52]
was one house I think it was like a
[1:43:54]
forplex on 200 East terrible derelict
[1:43:58]
thing. And somehow the people who bought
[1:44:02]
it actually got money to tear it down
[1:44:03]
and build in place the exact same number
[1:44:07]
of units. But most of the old structures
[1:44:11]
that we have in this area,
[1:44:13]
the economics don't work to build it
[1:44:16]
back with the same density. And so the
[1:44:19]
RC zone has increased the dilapidation
[1:44:24]
and the lowering quality of the housing
[1:44:27]
stock in most of this area.
[1:44:32]
Um,
[1:44:33]
I think we as a council need to be
[1:44:36]
looking at this carefully, how we can
[1:44:40]
preserve the character of the
[1:44:42]
neighborhood, but allow for
[1:44:46]
the use of it to meet the demands of the
[1:44:48]
people who are there now, not just the
[1:44:51]
people who were there 20 years ago. Um,
[1:44:55]
so this project meets some of the needs
[1:44:59]
of our constituents. It meets the needs
[1:45:03]
for more people to be able to buy a
[1:45:05]
home, to invest in a great part of Provo
[1:45:10]
where you can bike and walk everywhere.
[1:45:12]
You're close to parks and stores. Like,
[1:45:15]
this is a really great area. The single
[1:45:18]
family homes or the duplexes that are
[1:45:20]
being sold in this area are between 400
[1:45:23]
and I don't know like 700 $800,000 and
[1:45:27]
they need substantial work. This kind of
[1:45:29]
project is the only way that
[1:45:33]
new buyers entering the market are going
[1:45:36]
to be able to buy a home that they don't
[1:45:38]
then have to put in another $100,000 of
[1:45:40]
repair work. And I appreciate an old
[1:45:43]
home. I bought an old home and
[1:45:47]
we spend a lot and it seems like we're
[1:45:50]
always behind on the projects that we
[1:45:53]
need to maintain it because it is old.
[1:45:55]
Not everybody is going to make the
[1:45:58]
stupid financial decision that we made
[1:46:00]
to get an old home. So,
[1:46:04]
I like aspects of this project. I like
[1:46:08]
that it could increase homeownership in
[1:46:11]
this neighborhood, which would be more
[1:46:13]
stabilizing for the neighborhood. Um, I
[1:46:17]
think that's a lot of the benefit that
[1:46:20]
was intended
[1:46:22]
with the neighborhood plan, but it does
[1:46:25]
it in a way by changing the existing
[1:46:28]
structures, which of course goes against
[1:46:29]
the neighborhood plan. And so we need to
[1:46:32]
be looking at the competing values
[1:46:36]
that are there in the plan and they're
[1:46:38]
in our general plan for the city which
[1:46:41]
is newer than the neighborhood plan and
[1:46:43]
in that case supersedes it and think how
[1:46:46]
we can best accomplish those things and
[1:46:49]
balance these goals. Um the one year um
[1:46:55]
prohibition on renting I think is good.
[1:46:58]
Two years I think would be better. I
[1:47:00]
don't know about perpetual because those
[1:47:03]
are again then restrictions on that
[1:47:06]
individual owner's property right like
[1:47:09]
if there were a restriction on all
[1:47:10]
renting would that include for a family
[1:47:15]
um going off to do a service mission or
[1:47:18]
a sbatical or something where they're
[1:47:20]
gone but they're coming back. So that
[1:47:22]
would be a thing to think about with
[1:47:24]
that perpetual restriction.
[1:47:27]
Um, I know there are many people in the
[1:47:30]
neighborhood who are opposed to this,
[1:47:32]
but I also know that there are many
[1:47:34]
people in the neighborhood who really
[1:47:37]
want this and projects like this so that
[1:47:40]
they can afford to stop renting in the
[1:47:43]
neighborhood and buy homes and really
[1:47:46]
continue to invest their lives and their
[1:47:49]
families in our community.
[1:47:54]
» Thank you. Councelor
[1:47:57]
Whipple, great comments. Um,
[1:48:00]
[clears throat]
[1:48:03]
» okay. Um,
[1:48:05]
>> okay. Let's have
[1:48:07]
>> Okay. So, let's have Gordon answer the
[1:48:10]
question relative to
[1:48:15]
some of the pipe. So, there's capacity.
[1:48:18]
I think we talked to their
[1:48:20]
>> a little bit about how much pipe they
[1:48:22]
need to do, but it's not in my mind it's
[1:48:24]
not significant.
[1:48:27]
>> Okay,
[1:48:28]
>> they are the developer is the one Gordon
[1:48:31]
that's going to upsize the pipes, not
[1:48:33]
us.
[1:48:34]
>> It's the developer
[1:48:36]
>> and then we'll have capacity for sewer
[1:48:38]
and water and storm water.
[1:48:39]
>> Yes. Yes.
[1:48:41]
>> Is it a problem for the rest of the
[1:48:43]
neighborhood?
[1:48:44]
>> No. No.
[1:48:47]
Any questions?
[1:48:50]
>> Thanks, Gordon.
[1:48:51]
Um,
[1:48:53]
>> getting back to your concept of were you
[1:48:56]
thinking like an overlay zone for
[1:48:58]
something in the walking neighborhood
[1:49:00]
that they could have a 20ft step back if
[1:49:02]
the neighborhood was more immunable to
[1:49:04]
cottage type housing?
[1:49:06]
>> Yeah. I I just think when I look at this
[1:49:08]
project and from talking to some of the
[1:49:09]
neighbors neighbors here,
[1:49:11]
>> I I I I I really appreciate a lot of
[1:49:13]
what council said, but I think that the
[1:49:15]
risk you you look at with a development
[1:49:17]
like this, you get investors to buy it,
[1:49:19]
you get people who what I've done, which
[1:49:21]
is you buy something, you enter in on,
[1:49:23]
which is not a bad thing, but I'm just
[1:49:24]
saying and then you big buy a bigger
[1:49:26]
house and you hold on behind it and then
[1:49:27]
you rent it out.
[1:49:28]
>> And so I think that's the concern. But
[1:49:30]
if they were more cottage neighborhoods,
[1:49:32]
single family, detached, they maybe
[1:49:34]
could be places where people could could
[1:49:35]
live and raise a family. And so again,
[1:49:37]
it's like we have a lot of this type of
[1:49:38]
structure, like a lot of this type of
[1:49:40]
offering in our city. We don't have
[1:49:43]
smaller single family detached homes
[1:49:44]
that people can afford. And I think I've
[1:49:47]
heard the neighbor being more open to
[1:49:48]
the ladder than this. That's an
[1:49:50]
interesting concept that probably should
[1:49:53]
be explored even in the neighborhood
[1:49:54]
meetings to see if that's something that neighborhood would do, especially
[1:49:57]
where this plan is about 10 years old.
[1:50:00]
And we have heard from residents that
[1:50:02]
they are moving out because it is
[1:50:04]
transitioning to be more and more
[1:50:05]
unstable. Um, but I agree with Katrice.
[1:50:09]
I wouldn't there's there's a couple of
[1:50:11]
things that I find really not okay with
[1:50:13]
this and that's home ownership within
[1:50:16]
perpetuity because this right here is
[1:50:20]
where we're seeing a lot of the rentals
[1:50:22]
and that is the reason why we're having
[1:50:24]
the neighborhoods pushed back and why
[1:50:26]
we're seeing so much of this. The other
[1:50:28]
thing I don't like is the MDR zone
[1:50:31]
because yes, [clears throat] we can go
[1:50:34]
ahead and put that development agreement
[1:50:35]
in play, but that expires the day they
[1:50:37]
get their certificate of occupancy. So,
[1:50:39]
in 10 years from now, they could tear it
[1:50:41]
down and build
[1:50:42]
>> something
[1:50:42]
>> thousands more, and we don't have
[1:50:44]
control over that. So, I really I I
[1:50:47]
don't like any of I don't like I don't
[1:50:49]
like any of it. And I would push back
[1:50:51]
and say absolutely not.
[1:50:54]
>> Bill Pepperoni has some comments.
[1:51:05]
for getting this work.
[1:51:11]
Um, the RC zone, I think, accomplished
[1:51:13]
some important objectives the city had
[1:51:16]
back in 2002, which was to kind of
[1:51:19]
freeze things in place and give the city
[1:51:20]
a timeout to reevaluate things. A lot of
[1:51:23]
the questions that were raised go to
[1:51:26]
whether or not it's time to re-evaluate
[1:51:28]
those objectives and those goals.
[1:51:33]
Um, and that's a valid point. It's now
[1:51:35]
24 years past when the RC zone was
[1:51:38]
created.
[1:51:38]
>> And Bill, can I can I I read a document,
[1:51:40]
you can maybe tell me where it says
[1:51:41]
this, where when the RC zone was put in
[1:51:43]
place, it was actually intended to be
[1:51:44]
temporary. It was it basically said
[1:51:45]
there was some document I think it's the
[1:51:47]
city's plan at the time that said the
[1:51:49]
city will re-evaluate and and reszone.
[1:51:52]
Is that do you recall that?
[1:51:54]
>> I don't.
[1:51:54]
>> I'll find it.
[1:51:56]
>> Um,
[1:51:57]
so I think some important questions have
[1:51:59]
been raised in terms of what should we
[1:52:01]
reevaluate.
[1:52:03]
>> Um, I think though I am respectful of
[1:52:07]
the Wii neighborhood who followed the
[1:52:09]
Scamp South Kerry campus area master
[1:52:12]
plan that basically said north of 500
[1:52:14]
North go crazy. That's where density
[1:52:18]
belongs, but please help us preserve
[1:52:21]
what's south of 500. And those were a
[1:52:23]
lot of the comments that came out that
[1:52:25]
the planning commission that I'm sure
[1:52:26]
you're going to hear again tonight. I
[1:52:28]
think it is time for us to take a step
[1:52:30]
back and reevaluate some things. The
[1:52:32]
neighborhood plan has now been in place
[1:52:33]
for over 10 years. Um, but I think doing
[1:52:37]
that more strategically rather than spot
[1:52:39]
by spot might make more sense. Thank
[1:52:42]
you.
[1:52:44]
>> Thank you.
[1:52:45]
Yes, Councelor Christensen.
[1:52:49]
>> Yes, I I would just add um I do not feel
[1:52:52]
comfortable moving forward with this um
[1:52:55]
without a more holistic approach. I
[1:52:57]
really respect the neighborhood's wishes
[1:53:00]
and the the plans. I would not want a
[1:53:02]
city council coming into my neighborhood
[1:53:04]
and changing my plan, even if it's
[1:53:06]
newer. I think we owe this neighborhood
[1:53:09]
the opportunity to take a much more
[1:53:12]
holistic look. So, I I'm not in favor of
[1:53:16]
approving this plan. I know it provides
[1:53:18]
more housing. That would be good. I
[1:53:20]
agree with Becky. I think it's
[1:53:21]
problematic when you try and answer the the value of this on the back of
[1:53:27]
restricting ownership. I think we're
[1:53:29]
missing the bigger picture of I think we
[1:53:32]
need a more holistic look at this
[1:53:33]
neighborhood. I think Rachel brings up
[1:53:35]
some good points. I realize it may be
[1:53:37]
outdated, but taking a a spot approach
[1:53:41]
to especially high density, I I would I
[1:53:45]
don't uh I I I have a hard time
[1:53:47]
supporting this given that the
[1:53:49]
neighborhood is not behind a plan to
[1:53:52]
really address this issue.
[1:53:55]
>> Okay. Thank you, Councelor Christensen.
[1:53:57]
Unless there are any additional
[1:53:59]
comments, we'll continue this discussion
[1:54:02]
in our council meeting tonight. Thank
[1:54:04]
you, Dustin. Thanks.
[1:54:06]
>> I would just add really quickly to to
[1:54:08]
Becky's point that once the MDR is
[1:54:11]
approved, um I think it's very unlikely
[1:54:15]
that they would just tear it down
[1:54:17]
shortly after that to build something
[1:54:19]
with higher density. But even if they
[1:54:21]
did, they couldn't build thousands of
[1:54:23]
units there, right? I I'm sure that was
[1:54:26]
an exaggeration, but I just wanted to
[1:54:27]
make sure that the record was clear on
[1:54:29]
that. They would be capped at the number
[1:54:31]
of units per acre. And if the density is
[1:54:34]
what 50 units per acre and it's half an
[1:54:37]
acre, then it would be capped at 25
[1:54:39]
total units there. So that was all
[1:54:42]
>> right, Rachel. But it's it's not a step
[1:54:44]
up. A step up would be an MDR or an LDR.
[1:54:47]
This is HDR. You're going from
[1:54:50]
residential to HDR,
[1:54:52]
>> right? I was I was just making it clear
[1:54:54]
that it could never be thousands of
[1:54:56]
units there. That's all.
[1:54:59]
>> Thank you, Rachel.
[1:55:01]
We'll move then to item seven, a
[1:55:04]
resolution approving an interlocal
[1:55:06]
cooperation agreement between Provo City
[1:55:08]
and Springville City to share net
[1:55:10]
benefits from the Springville Rising
[1:55:13]
Development. This will be presented by
[1:55:15]
Cody Hill, economic development
[1:55:17]
director.
[1:55:22]
» Thank you, Council Member Good. Thank
[1:55:23]
you, council members. I'm presenting to
[1:55:25]
you on a potential interlocal agreement
[1:55:28]
between Provo City and Springville City.
[1:55:31]
This is in connection with the
[1:55:32]
Springville rising development. And
[1:55:34]
before I get into it, I just want to say
[1:55:36]
I had a legislative committee meeting
[1:55:39]
today with Utah cities and towns and we
[1:55:41]
talked about economic development
[1:55:42]
issues. And a lot of issues we're having
[1:55:44]
is with cities competing with each other
[1:55:46]
for sales tax dollars. And I I think
[1:55:49]
this is something that could be modeled
[1:55:51]
in Utah throughout Utah where cities are
[1:55:53]
not competing each other and going to
[1:55:55]
the lowest. You know, we'll give you the
[1:55:57]
most and we'll take the lowest amount to
[1:55:59]
get this or that retailer in, but we'll
[1:56:02]
cities will collaborate and work
[1:56:03]
together and benefit have a shared
[1:56:06]
benefit. I think this is a an
[1:56:08]
interesting and and good positive
[1:56:10]
direction. So, um I understand that
[1:56:14]
you're familiar with the Springville
[1:56:15]
rising. What they're looking for is a
[1:56:16]
reszone of PIC zoning to um some
[1:56:20]
residential and some commercial uh to
[1:56:22]
enable that development to happen. A
[1:56:24]
little bit of background is that Clyde
[1:56:26]
Company used to have their headquarters
[1:56:28]
and their all of their operations out of
[1:56:31]
Springville. They've grown. They've have
[1:56:33]
satellites out in other cities, but
[1:56:36]
they're looking to consolidate that back
[1:56:37]
into Springville, bring their
[1:56:39]
headquarters there, and have a big
[1:56:41]
development um kind of in line with that
[1:56:45]
uh strategic direction that they're
[1:56:47]
going. And this is on the very north end
[1:56:50]
of Springville, our very south uh
[1:56:52]
eastern edge right there, uh is where
[1:56:55]
the the development would go. and and so
[1:56:59]
because it's on both sides, Springville
[1:57:02]
and Provo, and they're looking for us to
[1:57:04]
reszone, um about 21 acres that could be
[1:57:08]
potentially uh productive in light
[1:57:11]
industrial. um they are looking for a
[1:57:13]
reason and to I think to help ease the
[1:57:16]
potential burden that Provo City might
[1:57:18]
face uh to share the net revenues that
[1:57:21]
both cities receive from property taxes
[1:57:23]
and sales taxes um ac across the borders
[1:57:27]
uh with each other. And so yeah, there's
[1:57:30]
21.6 acres in Provo City and 8.5 acres
[1:57:34]
in Springville City. And you'll see that
[1:57:36]
the balance of that development, the
[1:57:38]
majority of the commercial is that's
[1:57:42]
kind of what their site plan looks like.
[1:57:44]
Here's all of the residentials with a
[1:57:46]
little bit of retail. And here is um all
[1:57:48]
of the the commercial uh elements of
[1:57:51]
their uh plan, which you'll get more
[1:57:55]
into with the planning aspect of the
[1:57:57]
next two items. But um
[1:58:01]
the residential components are in Provo.
[1:58:03]
So, there's the 167 town homes, 90 condo
[1:58:08]
units, uh, that are in Provo with a
[1:58:10]
little bit of food and beverage retail,
[1:58:11]
about 10,000 square feet, and then that
[1:58:13]
majority of the,
[1:58:15]
um, the retail and office space is in
[1:58:19]
Springville. And so, what we're
[1:58:22]
contemplating in this interlocal
[1:58:23]
agreement is that the cities will look
[1:58:26]
at what the net benefit is to both
[1:58:29]
cities. So, we'll look at the sales tax
[1:58:30]
that's generated in these uh 21.6 acres,
[1:58:34]
and in that 8.5 acres, the sales tax
[1:58:37]
that's generated, the property tax
[1:58:39]
that's generated, and then we'll look at
[1:58:41]
the costs. And then when we're looking
[1:58:43]
at the costs, we're just talking about
[1:58:45]
the public safety, estimated public
[1:58:47]
safety costs, and those numbers were
[1:58:49]
pulled from our um business license fee
[1:58:52]
study that was just performed last year.
[1:58:54]
There are costs embedded into that. So,
[1:58:56]
a cost for police, for example, is um
[1:59:00]
400 $440 and the cost for fire is 380.
[1:59:04]
And so, the assumed additional um burden
[1:59:07]
for those. [clears throat]
[1:59:09]
And we just looked at public safety
[1:59:11]
because that is the majority of of a
[1:59:13]
budget item for a city and there's not
[1:59:16]
additional revenues associated with a
[1:59:18]
fire or a police call. Um whereas
[1:59:21]
utilities, water, and electricity,
[1:59:24]
you're the more you use, the more you
[1:59:25]
pay. And so we're looking at those costs
[1:59:29]
um subtracted from the revenues, and
[1:59:31]
then whichever city has the higher
[1:59:33]
amount of revenue, they would just take
[1:59:36]
the difference and and share half of it.
[1:59:38]
So both cities end up with the with the
[1:59:40]
same benefit from this development. And
[1:59:45]
the
[1:59:46]
um we Brian and I have emailed
[1:59:49]
extensively over the last week about
[1:59:52]
this um ironing out some some questions,
[1:59:54]
some issues that have come up. Um one of
[1:59:57]
them is triggering. When would this uh
[1:59:59]
potentially be triggered and it would be
[2:00:02]
triggered? And the agreement as it
[2:00:03]
stands right now is once 90% of both the
[2:00:06]
residential and the commercial uh is
[2:00:09]
completed uh that's when the agreement
[2:00:12]
would would trigger and begin uh sharing
[2:00:15]
revenues and um yeah were there any
[2:00:18]
other issues or you wanted to speak to
[2:00:20]
Brian? I think that's the only one. You
[2:00:22]
know, we So, I guess two issues. I would
[2:00:24]
say if you reviewed this over the
[2:00:27]
weekend, there was a new one uploaded
[2:00:29]
because of the changes that we made. I
[2:00:32]
would I don't think any of the changes
[2:00:33]
that we made were substantive. It was
[2:00:35]
more like clarifying. We put in a a an
[2:00:39]
inflationary adjustment table. um we
[2:00:42]
clarified the meaning of net income
[2:00:46]
versus total revenue and some things
[2:00:47]
like so it's all kind of clarification
[2:00:50]
stuff the one the one that I had had
[2:00:52]
some concerns about that I mentioned to
[2:00:54]
Cody was the trigger because they said
[2:00:56]
well if the commercial gets 90% built
[2:01:00]
and the residential gets 85% built the
[2:01:03]
agreement never triggers and we never
[2:01:05]
get anything
[2:01:06]
>> so that's that's been my biggest concern
[2:01:08]
and Cody just forwarded me this uh a
[2:01:11]
little bit ago go an email from um from
[2:01:15]
Springville. It sounds like they're a
[2:01:16]
little bit flexible. So, uh between now
[2:01:20]
and tonight, Cody will try to Cody and I
[2:01:22]
will try to adjust that a little bit.
[2:01:25]
>> Whitlock. Yes.
[2:01:26]
>> So, yeah, it's not just that scenario.
[2:01:27]
It's a scenario where basically we're
[2:01:29]
putting our revenue dependent on their
[2:01:30]
leasing market,
[2:01:31]
>> but they could build it all, but then
[2:01:33]
still not lease the units, right? and
[2:01:35]
then we would not get the revenue even
[2:01:36]
though our homes were almost certainly
[2:01:38]
due to finish our part and take on the
[2:01:40]
cost prior to them leasing the 90%.
[2:01:42]
>> Yeah. Yeah, that's a good point, too.
[2:01:44]
So, I mean, but they seemed Oh, sorry. I
[2:01:46]
turned this off. Uh Cody can speak to
[2:01:49]
this probably better than I can, but
[2:01:50]
they seemed open to us. Wasn't one of
[2:01:53]
the proposals even we could just change
[2:01:54]
it to as soon as there's a building
[2:01:55]
built on each side? They were okay with
[2:01:57]
that. So, they seem pretty flexible
[2:02:00]
about that. So, that's the one part that
[2:02:01]
I would still change before tonight.
[2:02:04]
Councelor Bogdan.
[2:02:05]
>> So when I read it, it had a sunset date.
[2:02:08]
It would expire in like 15 years. That's
[2:02:11]
not okay with me.
[2:02:12]
>> Okay. That was one of the issues that I
[2:02:14]
raised. I asked Cody about it. He asked
[2:02:16]
them about it. They said they didn't
[2:02:17]
want it to last for longer than that.
[2:02:19]
Spring don't convene. So
[2:02:21]
>> then they need to then they need to make
[2:02:23]
it more fair and they need to put more
[2:02:25]
commercial units on our side and more
[2:02:27]
housing on their side. If we're going to
[2:02:29]
do this sharing, it needs to be in
[2:02:30]
perpetuity forever. Not Not that. If if
[2:02:34]
so, they need to come back with a new
[2:02:35]
plan in my opinion because that's not
[2:02:37]
fair on us. The other thing that bothers
[2:02:39]
me is the school district and I realize
[2:02:41]
that we cannot negotiate for them, but
[2:02:44]
we are stuck
[2:02:47]
educating all those kids with very
[2:02:50]
limited
[2:02:52]
property tax values coming our way.
[2:02:55]
That's not fair either. So, it would be
[2:02:57]
fair in my perspective if the school
[2:03:01]
districts collaborated and if we
[2:03:04]
collaborated or if they just went ahead
[2:03:06]
and just split it 50/50. We get 50% of
[2:03:09]
the retail, they get 50% of the the
[2:03:12]
homes.
[2:03:15]
>> Yeah. And I understand that that is
[2:03:17]
[clears throat] that is a concern on
[2:03:18]
this the sunset date. They are looking
[2:03:20]
for something that's shorter. We can
[2:03:22]
absolutely um adopt what you feel is
[2:03:26]
best for Provo City and we can take that
[2:03:28]
back to them and they can agree or come
[2:03:31]
back and try and negotiate. But
[2:03:32]
absolutely we want to do what's best.
[2:03:35]
>> Is it common to do a sunset on an
[2:03:37]
arrangement like this?
[2:03:40]
I think in perpetuity going forever is
[2:03:44]
probably a little bit ownorous and you
[2:03:46]
know you don't know what's going to
[2:03:46]
happen there in 50 years and so there
[2:03:50]
probably it does probably I think make
[2:03:52]
more sense to have a sunset date even if
[2:03:53]
it is 50 years versus in perpetuity. So,
[2:03:58]
Cody, the um I think one of the
[2:04:00]
commissioners I'm sorry, Brian.
[2:04:02]
>> Well, I need to double check this now
[2:04:04]
that you said that, but when when Cody
[2:04:05]
said that, it triggers and I think I
[2:04:08]
need to look this up, but I think under
[2:04:09]
state code, there's actually a 50-year
[2:04:11]
limit on interlocal.
[2:04:12]
>> Oh, there is. Okay.
[2:04:13]
>> Okay. 50 though, not 15.
[2:04:15]
>> Right. 50.
[2:04:16]
>> Yeah. But that's that's close to
[2:04:18]
probably what is a useful life of a
[2:04:20]
development.
[2:04:20]
>> That's what I was thinking.
[2:04:21]
>> Interesting. Mhm. [clears throat] So, I
[2:04:24]
think one of the commissioners raised
[2:04:25]
this point, Cody, and a few residents as
[2:04:29]
well. This is to Becky's comment about
[2:04:31]
the school districts and the impact. Um,
[2:04:35]
and what jumps out at you is is why
[2:04:38]
Springville wouldn't simply look to have
[2:04:41]
this property annexed into their city
[2:04:44]
and control the entire Springville
[2:04:47]
rising development um, which is 20% in
[2:04:51]
Provo.
[2:04:53]
What discussions have there been about
[2:04:55]
that?
[2:04:58]
>> Oh, sorry.
[2:05:01]
» I'm sorry. Who's talking? It's Katrice.
[2:05:03]
Way more.
[2:05:04]
>> Go ahead.
[2:05:05]
>> Way more than 20% is in Provo.
[2:05:10]
» Isn't it 20% and 10%.
[2:05:12]
>> I mean, as far as acreage goes, it's 20
[2:05:14]
acres versus 9 acres. So,
[2:05:17]
>> you see that red line? That red line
[2:05:19]
shows you what's in
[2:05:20]
>> We should annex it.
[2:05:24]
» Yeah. Exactly.
[2:05:26]
>> We should be annexing them.
[2:05:28]
>> Yeah.
[2:05:29]
>> Okay. the Provo Rising development.
[2:05:32]
[laughter]
[2:05:32]
>> Yeah.
[2:05:36]
» So, did it come up in conversations?
[2:05:39]
>> I have not had any conversations with
[2:05:40]
that. I think is if Gordon were here, he
[2:05:43]
could talk about utilities and and where
[2:05:45]
utilities are coming from, where they're
[2:05:47]
being supplied.
[2:05:48]
>> Okay. Thank you, Cody.
[2:05:50]
>> I'm sure that would have a big, you
[2:05:52]
know, impact on whether it makes sense
[2:05:53]
to annex or not is on who would be
[2:05:55]
supplying those utilities, where the
[2:05:56]
utilities are closest. Councelor
[2:05:58]
Whipple.
[2:06:02]
» Yeah, I just had questions about the
[2:06:05]
property tax calculations. Um, I would
[2:06:09]
imagine that the property tax rates are
[2:06:11]
slightly different between Provo and
[2:06:13]
Springville. And so the amount of
[2:06:15]
property tax revenue we would be getting
[2:06:17]
is different than they would be getting
[2:06:18]
if it were their property. Um, and I was
[2:06:22]
just wondering if Cody had looked into
[2:06:24]
that when they were were looking at the
[2:06:26]
revenue sharing deal.
[2:06:29]
>> Yes. Yeah. So, the the property tax
[2:06:31]
rates are based on the actual rates for
[2:06:35]
the city of Provo and for the city of
[2:06:36]
Springville. Um, right now Springville's
[2:06:39]
property tax rate is 0.00179.
[2:06:45]
Um, whereas Provos is 0.1678.
[2:06:50]
And so Provos is um a [clears throat]
[2:06:52]
bit higher than than spring bills.
[2:06:55]
>> And is that because we have the library
[2:06:57]
component? Like do we have more line
[2:06:58]
items in our city property tax portion
[2:07:01]
than they have?
[2:07:03]
>> I believe so.
[2:07:04]
>> Okay.
[2:07:07]
Cuz I I liked the the idea of fairness
[2:07:10]
that we had, right? Like in a low sales
[2:07:12]
tax year but high property tax years,
[2:07:14]
you know, we're giving them some of the
[2:07:15]
property tax and high sales tax years.
[2:07:17]
they give us some to equalize it. In
[2:07:20]
principle, I think that sounds really
[2:07:22]
good. Um, but we are providing services
[2:07:27]
like the library in Provo that that we
[2:07:30]
definitely need those property taxes
[2:07:32]
for. Um,
[2:07:34]
I I think it makes sense to increase the
[2:07:38]
agreement period, the sunset to pretty
[2:07:42]
much closer to the useful length of life
[2:07:44]
of the development. Um, I don't know, 50
[2:07:48]
years, but certainly 30 years I think I
[2:07:50]
would be happier with. Um, I'm sure they
[2:07:52]
would not be happier with that. But
[2:07:54]
those are are my thoughts. Well, one
[2:07:58]
more. I actually think this is a really
[2:08:01]
good project. It's unfortunate that it
[2:08:03]
straddles two cities so that we have to
[2:08:05]
try to figure out something like that.
[2:08:07]
But for the southeast area of Provo and
[2:08:10]
that entrance to Springville, this is a
[2:08:12]
great way to revitalize that whole area.
[2:08:16]
And I don't want to kill this project
[2:08:19]
because I think that's going to be good
[2:08:21]
for that whole South State Street area.
[2:08:24]
I'm I'm really happy that a local
[2:08:27]
company, Clyde, is looking at doing this
[2:08:29]
kind of reinvestment in its community.
[2:08:32]
um like this is like
[2:08:35]
instead of us doing our redevelopment
[2:08:38]
agency and you know figuring out funds
[2:08:40]
for it, it's a private company that's
[2:08:41]
doing this that's building this really
[2:08:43]
useful good project that supports
[2:08:46]
commercial and residents. I I'm really
[2:08:49]
happy to see it.
[2:08:52]
>> Yeah, as I as I stated at the very
[2:08:54]
beginning, I think it's great to to work
[2:08:55]
cooperatively with your neighbors and have a sharing agreement that's that really shows equality. um in in the
[2:09:02]
benefit. Um when I was with Midville
[2:09:06]
City as their economic development
[2:09:07]
manager, we tried to work with Murray
[2:09:10]
City on a station area plan because the
[2:09:13]
station was kind of bordered the two
[2:09:15]
cities and they said, "No, we're
[2:09:17]
actually not interested in that, but
[2:09:18]
hopefully they'll get better people up
[2:09:20]
there."
[2:09:20]
>> Great comments. Thank you, councelor.
[2:09:22]
Whitlock. Yeah, just to echo,
[2:09:26]
I was in [clears throat] the
[2:09:26]
neighborhood meeting where this was
[2:09:27]
reviewed last week and I'll say
[2:09:30]
generally very positive feelings from
[2:09:32]
the neighborhood about this development.
[2:09:34]
Uh, you know, there's a number of
[2:09:36]
factors in that part of Provo that I
[2:09:38]
know the residents care about. Uh, it's a food desert. There's very few
[2:09:42]
places to go and grab places to eat or
[2:09:44]
to shop. Um, the Spring Creek Elementary
[2:09:48]
is sort of un is a it was on the list of
[2:09:50]
schools they're looking to close because
[2:09:52]
it's well below its cap and so the
[2:09:54]
students would be helpful. The concerns
[2:09:55]
were primarily around the fairness of
[2:09:57]
this agreement. Um, Jennifer Cartridge
[2:10:00]
from the school board was there also had
[2:10:01]
questions about how property taxes would
[2:10:03]
play into account raising similar
[2:10:04]
concerns as you. And so I like this
[2:10:06]
development. I'd like it to happen, but
[2:10:08]
I have a lot of issues with this
[2:10:10]
agreement of some of which we've named
[2:10:11]
as some of which we could talk for 30
[2:10:13]
more minutes about. Like I I don't
[2:10:14]
understand why we're only including
[2:10:16]
safety as costs when we're taking on
[2:10:18]
road plowing, infrastructure
[2:10:20]
maintenance, you know, road liabilities.
[2:10:22]
Like anyway, there's a lot of details we
[2:10:24]
could get into here, but that's my
[2:10:25]
general feeling.
[2:10:27]
>> Thank you, Councelor Whitlock.
[2:10:29]
Any other comments? Councelor Bogden.
[2:10:32]
>> So Gordon will be here tonight to answer
[2:10:34]
the infrastructure stuff because I know
[2:10:36]
that's one that a resident has brought
[2:10:38]
up was where is that infrastructure
[2:10:40]
coming from? Is it coming from Provo?
[2:10:42]
Was it coming from Springville?
[2:10:44]
So, I'd like that answered. Um,
[2:10:47]
also, gosh, what was there? There was
[2:10:50]
another one that they had. Oh, just to
[2:10:53]
clarify, we cleaned up a lot of iron and
[2:10:55]
we paid a lot of money to clean it up,
[2:10:57]
right?
[2:10:59]
>> How much money did we pay for this
[2:11:00]
parcel to be cleaned up or how much are
[2:11:03]
we expecting it to generate to come back
[2:11:05]
for that cleanup funding?
[2:11:07]
>> I can look into the small area plan
[2:11:09]
which governs this area. I'm not sure
[2:11:11]
that there's a dollar amount specific to
[2:11:13]
parcels. Um, but I can give you some
[2:11:15]
details about the remediation efforts in
[2:11:18]
that area
[2:11:19]
>> because that's also a concern. I don't
[2:11:21]
know that Springville paid anything for
[2:11:23]
remediation, did they?
[2:11:24]
>> I'm not aware of that.
[2:11:26]
>> And so, I think that we also need money
[2:11:28]
coming back for that. I mean, we're It
[2:11:30]
seems like they're getting a lot of
[2:11:31]
benefit for
[2:11:33]
a lot of benefit and it seems like we've
[2:11:36]
done a lot to this area to bring it to
[2:11:38]
where it is today.
[2:11:40]
Yeah, they also would would note that
[2:11:43]
they are also giving up there's a there
[2:11:46]
was a used car lot and two restaurants
[2:11:49]
on that site and they're removing it and
[2:11:52]
to provide this development as well. So
[2:11:54]
I think they they would note that we're
[2:11:56]
also giving up some revenues that are
[2:11:58]
existing now for a future benefit to
[2:12:00]
both cities.
[2:12:02]
>> Yeah, I don't think the city did much
[2:12:04]
remediation at all. I think we passed
[2:12:06]
that responsibility on to the people who
[2:12:08]
bought properties from us.
[2:12:09]
>> Okay.
[2:12:10]
>> Is that how it works?
[2:12:11]
>> Yeah. Like
[2:12:12]
>> Okay.
[2:12:14]
>> Man who built hallmation
[2:12:23]
stuff.
[2:12:26]
>> Okay. [clears throat]
[2:12:27]
>> So, we don't necessarily have much skin
[2:12:30]
in the game as far.
[2:12:33]
>> Thanks,
[2:12:34]
>> Cody. Why don't you continue with the
[2:12:36]
next two items relative to this one is
[2:12:38]
the zone map classification
[2:12:41]
amendment and then the general plan map
[2:12:44]
designation amendment. Let's just
[2:12:45]
continue
[2:12:47]
and um
[2:12:49]
because they they kind of um oh
[2:12:53]
>> oh sorry about that. Okay co Cody thank
[2:12:56]
you. Yes, of course.
[2:12:57]
>> Quick note, council,
[2:12:59]
>> and maybe we want to do this after we
[2:13:01]
hear Aaron and Brian jump in, but just
[2:13:03]
as um Cody and Brian go back to
[2:13:07]
negotiate development agreement, if the
[2:13:09]
council does have very specific things
[2:13:11]
they would like to see in that, motions
[2:13:13]
would be helpful and maybe after hearing
[2:13:15]
context from Aaron's items, that might
[2:13:17]
be a better place to do that. Let's do
[2:13:19]
that. But motions would be helpful as to
[2:13:22]
negotiate.
[2:13:22]
>> Okay. So, you'll hang out Cody here.
[2:13:25]
Okay.
[2:13:25]
>> Yes. Okay. Thank you.
[2:13:26]
>> I'll be around.
[2:13:27]
>> All right.
[2:13:28]
>> And so let's turn the time to Aaron
[2:13:31]
>> for the next two items. Same
[2:13:33]
development, but one regarding the zone
[2:13:36]
map classification and the other the
[2:13:39]
general plan map designation.
[2:13:43]
>> Okay. Um, so
[2:13:46]
because these items are going to be on
[2:13:47]
your agenda tonight, I won't go into
[2:13:49]
like the full presentation. maybe just
[2:13:51]
save this time for for questions that I
[2:13:53]
could try to answer now or prepare
[2:13:54]
answers for for this evening. But
[2:13:56]
essentially, it's it's going from an
[2:13:58]
industrial zone and general plan
[2:13:59]
designation uh to a mixeduse designation
[2:14:02]
and a mix between medium density zoning
[2:14:05]
and some uh general commercial zoning uh
[2:14:08]
to to fill the the kind of the vision of
[2:14:11]
a Springville Risings project. Um, but
[2:14:14]
if there's any specific questions I can
[2:14:15]
try to answer now or or for tonight,
[2:14:19]
>> councelor Van.
[2:14:21]
>> Okay. So, when I read the development
[2:14:22]
agreement,
[2:14:24]
>> I guess first question I should ask, do
[2:14:26]
you have any idea why they
[2:14:28]
procrastinated giving that to us until
[2:14:32]
>> um I think I think this council has
[2:14:34]
gotten used to having development
[2:14:35]
agreements at the time of the packet. In
[2:14:38]
the past, that wasn't typical. So,
[2:14:40]
typically in the past, councils have
[2:14:43]
negotiated that development agreement at
[2:14:45]
the time of the reszone hearing. Um, but
[2:14:48]
this council has gotten used to having
[2:14:49]
those up front. Um, so I don't know if
[2:14:51]
it's a a delay on purpose, but just as
[2:14:56]
they kind of worked out the details with
[2:14:58]
our legal team, uh, a draft was ready
[2:15:00]
when it was ready.
[2:15:01]
>> So, to me, I still need to be able to
[2:15:04]
read it and I still need time to read
[2:15:06]
that. And I like those with the packet.
[2:15:09]
I think that's what we've we've
[2:15:12]
established is if you don't have things
[2:15:13]
ready, then it gets continued.
[2:15:15]
>> Well, it's not a requirement per se is
[2:15:16]
what I'm saying.
[2:15:18]
>> But what I'm saying is to me that
[2:15:21]
creates a council that doesn't have time
[2:15:24]
to review it and it's like a rubber
[2:15:26]
stamp council and that's not the council
[2:15:27]
that I'm comfortable with. I would
[2:15:29]
prefer those documents earlier where we
[2:15:31]
can review them and then of course we
[2:15:32]
will have those conversations but we we
[2:15:35]
will be prepared to have those
[2:15:37]
conversations during these meetings.
[2:15:39]
>> Yeah, Council Bugin that's a I mean it's
[2:15:41]
a very valid concern. It's a little bit
[2:15:42]
difficult with development agreements
[2:15:44]
because of the way they work. Uh, I
[2:15:46]
mean, in some ways,
[2:15:48]
we're almost kind of dinging this
[2:15:49]
developer for having prepared one
[2:15:52]
because most developers don't prepare
[2:15:54]
one at all until because the normal
[2:15:57]
process for development agreements. And
[2:15:59]
again, this is going to be contradicted
[2:16:01]
in just a few minutes by Vesper, but
[2:16:03]
Vesper, I'm going to actually have some
[2:16:05]
introductory comments about Vesper about
[2:16:06]
the fact that it's an super unusual
[2:16:08]
case. Normally, we don't have any idea
[2:16:12]
that a development agreement is even
[2:16:16]
necessary until the developer is in
[2:16:19]
front of the council and the council
[2:16:22]
says, "Here are our concerns that we
[2:16:24]
need you to address in order for us to
[2:16:26]
feel comfortable with this reszone." And
[2:16:28]
then normally in the meeting, the
[2:16:31]
developer says, "Well, I'm happy to
[2:16:32]
enter into a development agreement that
[2:16:34]
says the following things." and you vote
[2:16:37]
on a resolution that says we approve
[2:16:39]
this reszone and authorize the mayor to
[2:16:41]
negotiate a development agreement that
[2:16:43]
says what the developer said in the
[2:16:45]
meeting. That's that's actually the
[2:16:47]
normal process. And usually the the
[2:16:50]
council in 90% I'd say 80% of cases the
[2:16:54]
uh council never even sees the
[2:16:56]
development agreement because it just is
[2:16:59]
an executive function taken after the
[2:17:01]
meeting to memorialize what they said in
[2:17:03]
the meeting. Now, sometimes we get
[2:17:06]
developers who are a little bit more
[2:17:07]
sophisticated and they they know that
[2:17:10]
there's going to be a concern, so they
[2:17:11]
try to address the concerns upfront and
[2:17:14]
so they give a draft. Um, I I don't want
[2:17:18]
to disincentivize them for doing that by
[2:17:21]
saying if you do something that 80% of
[2:17:23]
the other people aren't doing, you have
[2:17:24]
to do it sooner. Does that does that
[2:17:26]
make sense? Um, but I don't disagree
[2:17:28]
that it was very last minute as far as
[2:17:30]
giving you something to look at. And so
[2:17:32]
I understand the concern about that, but
[2:17:34]
I think it needs to be tempered with.
[2:17:36]
Maybe we just need to have more
[2:17:37]
discussion about what our development
[2:17:38]
agreement process should be. But we have
[2:17:42]
not in the past taken the approach that
[2:17:45]
every time we learn at the last minute
[2:17:47]
that you want one that we continue it
[2:17:49]
until you can see it. Does that make
[2:17:51]
sense? So most of the time you're never
[2:17:52]
even seeing
[2:17:54]
>> and sometimes there isn't even one,
[2:17:56]
>> right? A lot of times there isn't one
[2:17:58]
because we don't know.
[2:18:00]
And this will go to comments that I was
[2:18:01]
going to make in the in the vest
[2:18:02]
meeting. We don't know that the council
[2:18:04]
has concerns until they're actually
[2:18:05]
standing in front of you and you state
[2:18:07]
what your concerns are. So, usually the
[2:18:10]
only reason we get one before that is
[2:18:11]
because staff has concerns and they say,
[2:18:15]
"We're not going to recommend approval
[2:18:17]
if you don't do a DA that does the
[2:18:19]
following things." Or they try to guess
[2:18:21]
like sometimes like with the home
[2:18:23]
ownership thing.
[2:18:24]
staff has been pretty proactive uh
[2:18:27]
sometimes over my objections to say we
[2:18:31]
know that this is a big issue from the
[2:18:32]
council so you should so you should
[2:18:34]
react to it proactively instead of
[2:18:36]
waiting until they tell you that it's an
[2:18:37]
issue. Um so so sometimes we do get them
[2:18:41]
beforehand but it's actually the rarer
[2:18:43]
case not the more common case.
[2:18:45]
>> Gotcha.
[2:18:46]
>> Interesting. But so so my so my my
[2:18:50]
personal
[2:18:51]
uh feedback on what you just said is
[2:18:53]
that instead of asking for them sooner,
[2:18:56]
you should be really really really ready to continue things,
[2:19:01]
right? because it's going to be hard to
[2:19:04]
get them beforehand. But I think instead
[2:19:07]
of feeling pressure to vote on things
[2:19:09]
that you haven't seen, you should say in
[2:19:11]
the in the meeting where you see it for
[2:19:13]
the first time, you should say, "Great,
[2:19:16]
here are the things that I'm still not
[2:19:17]
satisfied with. Until those things are
[2:19:19]
satisfied, I don't feel comfortable
[2:19:21]
approving this. So, let's continue it
[2:19:22]
until you address those things." That I
[2:19:25]
think is actually the preferable method,
[2:19:27]
>> okay?
[2:19:27]
>> Over asking for demanding stuff further
[2:19:30]
in advance,
[2:19:30]
>> right? Just continue it here. Okay. So,
[2:19:33]
I do have a problem with the the
[2:19:35]
development agreement. It seems like
[2:19:37]
when I read it, you can tell me if I
[2:19:39]
read it wrong that they are saying that
[2:19:41]
they are guaranteeing homeowner
[2:19:43]
occupancy years after.
[2:19:49]
» They're they are saying that they will
[2:19:51]
have homeowner occupancy for two years
[2:19:54]
after they get the certificate of
[2:19:55]
occupancy. This isn't in perpetuity.
[2:19:57]
This is just the first two years of
[2:20:01]
occupancy.
[2:20:02]
>> Correct.
[2:20:03]
>> Okay. So that that I would I would say
[2:20:06]
no. I I would say you need to do it in
[2:20:08]
perpetuity.
[2:20:08]
>> And that is absolutely great and perfect
[2:20:11]
feedback for tonight to the developer
[2:20:12]
about why you
[2:20:13]
>> are they not watching any of this?
[2:20:15]
>> I don't have any idea.
[2:20:18]
>> So it's not every time the property
[2:20:20]
changes hands
[2:20:23]
right now. is the initial two-year
[2:20:24]
period in that.
[2:20:25]
>> Okay,
[2:20:26]
>> that's how I read it.
[2:20:28]
>> Okay,
[2:20:28]
>> that was I think one of the things that
[2:20:30]
I called out to you when I sent you the
[2:20:32]
draft by email.
[2:20:35]
>> Okay.
[2:20:36]
>> Was there just remind me was there
[2:20:38]
anything else that you called out by
[2:20:39]
email?
[2:20:39]
>> The other thing that the other thing
[2:20:41]
that I mentioned when I emailed it to
[2:20:42]
you is that the I think there's five
[2:20:45]
paragraph five substantive par sub
[2:20:47]
paragraphs to section four. three
[2:20:49]
through five
[2:20:51]
don't really say very much. They they're
[2:20:56]
essentially versions of we'll try to do
[2:20:58]
something to address something and but
[2:21:01]
they don't they're not concrete at all.
[2:21:04]
And so I called that out as being
[2:21:05]
something that I wasn't sure if the
[2:21:06]
council would be comfortable with.
[2:21:08]
>> Then maybe that's something that we
[2:21:09]
should consider continuing after we hear
[2:21:11]
the presentations. Continue this until
[2:21:13]
they specify what that is.
[2:21:17]
>> Yeah. Yeah. And I think that's that is
[2:21:18]
entirely what in my view what tonight's
[2:21:21]
meeting
[2:21:22]
is about is the opportunity for you to
[2:21:24]
tell them your concerns and what you're
[2:21:26]
dissatisfied with so that they give a
[2:21:28]
chance to to respond to because the
[2:21:30]
development agreement is really just
[2:21:31]
their prof. That's it's what they're
[2:21:33]
saying they're willing to do right now,
[2:21:34]
but they haven't gotten any feedback
[2:21:36]
from you yet.
[2:21:36]
>> So the continuence you would recommend
[2:21:38]
in tonight's meeting,
[2:21:39]
>> right? If
[2:21:40]
>> not now, but in tonight's meeting,
[2:21:41]
>> right? My recommendation would be you
[2:21:44]
let them show up tonight. You let them
[2:21:45]
make their presentation. You tell them
[2:21:47]
any deficiencies that you see. They may
[2:21:50]
be able to respond to those deficiencies
[2:21:52]
on the spot, right? If and then we might
[2:21:55]
be able to do a a hybrid version where
[2:21:57]
we where we say you're approving a
[2:22:00]
development agreement that comport that
[2:22:02]
it will be changed to reflect what they
[2:22:05]
promise in the meeting. more similar to
[2:22:06]
the process that I described earlier,
[2:22:08]
>> but I think we only had a chance to
[2:22:10]
study the what they profered first. It
[2:22:12]
was kind it came so late that I don't
[2:22:14]
know that any of us have really had a
[2:22:15]
chance to really look at it.
[2:22:17]
>> Well, and and and again, I I wouldn't
[2:22:19]
expect you to I would expect them in the
[2:22:21]
meeting to walk very carefully through
[2:22:24]
their profer and explain exactly what
[2:22:25]
they're profering and then for then you
[2:22:27]
to push back on the the meeting because
[2:22:31]
and again this goes back to to the
[2:22:33]
Vesper issue, right? Because development
[2:22:35]
agreements are negotiated with the
[2:22:36]
council, not with the administration.
[2:22:38]
Your chance to negotiate it is in the
[2:22:40]
meeting.
[2:22:44]
» Thanks.
[2:22:46]
>> Does it make u better sense necessarily
[2:22:50]
to have the these two items presented
[2:22:54]
first followed by the um
[2:22:58]
interlocal agreement or the way it is
[2:23:00]
here?
[2:23:02]
Um, well, I was thinking that as when
[2:23:04]
Cody came to the stand. I think for the
[2:23:05]
public, it makes more sense to do the
[2:23:08]
proposal before the entry level.
[2:23:10]
>> Okay?
[2:23:10]
>> Because then they're seeing what's being
[2:23:11]
proposed before we discuss the revenue
[2:23:14]
portion of it.
[2:23:15]
>> Okay?
[2:23:17]
>> And as long as they're noticed on the
[2:23:19]
same agenda, it doesn't matter what
[2:23:20]
order you.
[2:23:22]
>> Okay? I think one note about that is
[2:23:25]
from what I've understood about this
[2:23:27]
whole development is if the interlocal
[2:23:30]
agreement isn't there then the general
[2:23:32]
plan zone's probably not true
[2:23:34]
>> favorable right true
[2:23:36]
>> yeah so you may
[2:23:38]
what you may what you may want to do is
[2:23:40]
read all three of them into the into the
[2:23:42]
agenda have Erin present first about
[2:23:45]
what the meeting is then have Cody
[2:23:46]
present about what the proposed
[2:23:48]
interlocal is but not vote on any of
[2:23:51]
them until you've heard all three of
[2:23:54]
them and then vote on the interlocal
[2:23:55]
first.
[2:23:55]
>> Yeah. Okay.
[2:24:02]
» Yes. Council Red.
[2:24:03]
>> Yeah. I mean it's interesting because
[2:24:07]
I'm what I'm hearing is we as a council,
[2:24:10]
we like this bill and we'd like to make
[2:24:11]
happen, but we have a lot of concerns
[2:24:12]
with this agreement. And it's weird to
[2:24:15]
kind of take these items tonight
[2:24:18]
when that's the crux of the issue and
[2:24:20]
we're not in a place where we can make a
[2:24:23]
decision because we're negotiating with
[2:24:24]
another party.
[2:24:27]
I mean, so the alternative is I guess
[2:24:28]
again because and I I get that too
[2:24:30]
because you're going to have public
[2:24:31]
comment about something that you're not
[2:24:33]
even So the alternative is if you know
[2:24:36]
right now without having the applicant
[2:24:39]
here to tell you their answers to your
[2:24:41]
questions exactly how you want the
[2:24:44]
development agreement changed. You could
[2:24:46]
make motions about what you want changed
[2:24:50]
about it and then you could continue the
[2:24:52]
item and then staff would have direction
[2:24:54]
based on your motions. go back to the
[2:24:57]
developer and say council doesn't want
[2:24:59]
to hear your item until the development
[2:25:00]
agreement says the following things.
[2:25:02]
>> Well, I think I think more of the
[2:25:04]
concern that I was hearing is we have to
[2:25:07]
have that interlocal agreement with
[2:25:09]
Springville in place first before the
[2:25:12]
rest of it makes sense. And right now I
[2:25:14]
think there's concerns with that
[2:25:16]
interlocal agreement between us and
[2:25:17]
Springville.
[2:25:19]
Is am I am I following the right path
[2:25:22]
here?
[2:25:22]
>> I think so. Yeah. And so it doesn't make
[2:25:25]
any sense for us to to negotiate a
[2:25:27]
development agreement if that makes no
[2:25:30]
sense if our interlocal agreement isn't
[2:25:32]
going to pass. And it seems like we have
[2:25:35]
a a lots of questions and issues with
[2:25:38]
that interlocal agreement at this time.
[2:25:41]
>> Yeah, if I could
[2:25:43]
>> if I could jump in
[2:25:47]
>> Oh, go ahead.
[2:25:51]
» If I could jump in. I um I didn't get a
[2:25:55]
chance to weigh in at the end of the uh
[2:25:57]
the Springfield discussion, but I I too
[2:25:59]
have major concerns about the interlocal
[2:26:01]
agreement and so I think Becky's
[2:26:03]
bringing up some very valid points. I
[2:26:04]
just wanted to weigh in.
[2:26:07]
>> Thank you, Craig.
[2:26:08]
>> For my clarification, just so I'm Were
[2:26:11]
there issues with the interlocal besides
[2:26:13]
the trigger point and the length of it?
[2:26:15]
>> I I like I can answer one.
[2:26:18]
>> Okay, councelor Woodlock. So, and again,
[2:26:20]
maybe I'm misunderstanding, so maybe I
[2:26:22]
don't know if Cody left, but the way I
[2:26:23]
read the interlocal agreement was
[2:26:24]
basically Okay. It's basically like net
[2:26:27]
benefit minus costs. Whoever has the net
[2:26:30]
benefit then pays 50% of the other
[2:26:32]
>> side. That's kind of how it works,
[2:26:33]
right?
[2:26:34]
>> Yes.
[2:26:34]
>> So, my concern is that like my
[2:26:36]
understanding is we all know that
[2:26:38]
residential housing costs more to a city
[2:26:41]
to maintain than businesses,
[2:26:42]
>> right? Yet, we exclude all of the costs
[2:26:45]
of
[2:26:47]
the true I think I calculated 7x
[2:26:49]
basically because we're only counting
[2:26:51]
safety. We're excluding all the costs of
[2:26:53]
supporting those homes. And so, we could
[2:26:55]
actually get a bad sales tax here where
[2:26:57]
we're actually paying to spring bill.
[2:26:58]
And that to me just fundamentally
[2:27:00]
doesn't make sense when you look at
[2:27:01]
what's actually happening in reality.
[2:27:03]
So, that's so I just have like a really
[2:27:05]
big concern with the fundamental
[2:27:06]
structure of the agreement. I think your
[2:27:09]
point is valid, but it's not as extreme
[2:27:11]
as you may be thinking because of the
[2:27:13]
way this has been proposed. Most of it's
[2:27:15]
going to be private maintenance.
[2:27:17]
>> These are private roads going through
[2:27:18]
>> all in HOA.
[2:27:20]
>> Yes. So I I don't I think you have a
[2:27:22]
valid point, but it's just not as
[2:27:24]
extreme.
[2:27:25]
>> Maybe not 7X,
[2:27:26]
>> right? Exactly.
[2:27:28]
But
[2:27:28]
>> I was assuming we were taking on
[2:27:29]
maintenance of the streets, the plowing,
[2:27:31]
the sidewalks, the
[2:27:32]
>> That's not the case. The storm drain.
[2:27:35]
What like what do we What are our costs?
[2:27:38]
But it I mean I imagine it's more on
[2:27:40]
safety, right?
[2:27:40]
>> Yes. But it's not going to be snow
[2:27:43]
plowing except for the public streets
[2:27:45]
and there's only the ones on the
[2:27:46]
perimeter. But to Becky's original
[2:27:49]
point, I think that if there's not an
[2:27:51]
interlocal agreement, we probably don't
[2:27:53]
want the zone change. Correct. So that's
[2:27:56]
why that's what gives that the higher
[2:27:58]
priority.
[2:27:58]
>> Well, isn't isn't that what we were kind
[2:28:00]
of saying? That's what Erin was saying
[2:28:02]
that the zone change, the general plan
[2:28:04]
amendment, none of it makes sense unless
[2:28:05]
this interlocal agreement goes forward.
[2:28:08]
>> So to me, if council has issues with the
[2:28:12]
interleal agreement, it probably makes
[2:28:13]
sense to just continue the other two
[2:28:15]
items
[2:28:16]
even now and give everybody a a heads up
[2:28:20]
and then we can that gives us a chance
[2:28:23]
to look at their development agreement
[2:28:24]
just in case and then we can have those
[2:28:26]
conversations after we get this passed.
[2:28:30]
But to Lilia's point, it's really
[2:28:31]
helpful for them tonight to hear what
[2:28:33]
your objections are to the inter goal.
[2:28:35]
>> Yes.
[2:28:35]
>> And spec I would articulate it in
[2:28:38]
principle. I would like the true cost of
[2:28:41]
service to be represented in the
[2:28:42]
interlocal agreement.
[2:28:43]
>> Okay. And then I like I I I shouldn't
[2:28:46]
say I correct what I said earlier. I
[2:28:48]
think at the highest level formula it
[2:28:50]
makes sense. Net benefit split 50/50. I
[2:28:53]
just don't think we're properly
[2:28:54]
accounting for the costs is my point.
[2:28:56]
And then I agree with the duration as
[2:28:57]
being a major concern too.
[2:28:59]
But I think my question would be how
[2:29:01]
much of the cost do you want included
[2:29:04]
because to represent reality like as
[2:29:06]
close to reality as possible so that we
[2:29:08]
are truly so that the principle which I
[2:29:10]
think we're all agreeing on and maybe
[2:29:11]
that's where I would start with the
[2:29:12]
negotiation with Springville is we are want this to be fair. We want
[2:29:17]
each side to benefit equally relative to
[2:29:18]
the cost they're taking on. And that
[2:29:20]
would I would try to make the formula
[2:29:22]
represent reality as much as possible.
[2:29:23]
And I don't think we're there.
[2:29:24]
>> So all ongoing maintenance that will be
[2:29:26]
city responsibility. That's what you
[2:29:28]
have to say
[2:29:29]
>> or both.
[2:29:30]
>> And you're looking for actuals, not
[2:29:32]
estimates.
[2:29:33]
>> I mean, modeling is modeling is fine
[2:29:35]
just as long as it's also takes it into
[2:29:38]
account.
[2:29:38]
>> I think the concern on my side is just
[2:29:40]
that we can get so granular that the
[2:29:42]
cost of actually figuring out what the
[2:29:44]
costs are is more than the transfer is
[2:29:47]
going to be.
[2:29:48]
>> Yeah. And I think that's a totally fair
[2:29:49]
point. I just think we know roughly what
[2:29:51]
the large categories are and then we
[2:29:52]
could add assumptions into those C. I
[2:29:54]
mean, that's what we're doing with
[2:29:54]
police. You're doing like a cost per
[2:29:56]
call assumption. Mhm.
[2:29:57]
>> Yeah. I just when I ran some scenarios,
[2:29:59]
I could I could just easily see years
[2:30:01]
where we're actually paying out to
[2:30:03]
Springville and I think that just
[2:30:04]
fundamentally doesn't make sense.
[2:30:08]
» Yeah. So,
[2:30:10]
understanding your concerns is very
[2:30:12]
helpful and then also um providing
[2:30:15]
proposed solutions to it is helpful for
[2:30:18]
me.
[2:30:18]
>> Tell me if you think I'm wrong. By the
[2:30:20]
way, if you think I'm making inaccurate
[2:30:21]
statements, I'd love to hear it. I'm
[2:30:23]
just trying to articulate the site as
[2:30:24]
clearly as possible. I'm not going to
[2:30:26]
say you're wrong. I'm just saying that.
[2:30:28]
>> No, but I'm saying if you think like for
[2:30:29]
example, if you think that we are not
[2:30:31]
going to actually take on more costs in
[2:30:33]
reality and that Springfield actually is
[2:30:34]
going to take on more costs and
[2:30:35]
>> then then I'd like to hear that. But my
[2:30:37]
understanding just based on residential,
[2:30:41]
home, school district, all the things
[2:30:42]
that you have, it tends on that to be
[2:30:45]
far more costly than businesses.
[2:30:47]
>> Yeah. I I'm again I'm not saying you're
[2:30:49]
wrong. My concern is administering the
[2:30:51]
agreement and the more complex it is,
[2:30:53]
the harder it's going to be to
[2:30:54]
administer, the longer it's going to
[2:30:56]
take and the [clears throat] the net
[2:30:58]
benefit of of that might not outweigh
[2:31:01]
the cost and the effort of of getting
[2:31:03]
that exact number. So, if we want to
[2:31:04]
include um additional costs that are
[2:31:08]
larger into this, a couple is I'm
[2:31:11]
totally fine with that. We want to get
[2:31:13]
granular and not make estimates for what
[2:31:16]
the costs are, but really get in and
[2:31:19]
have the police and fire sit over their
[2:31:21]
data and the aggregate number of calls.
[2:31:24]
>> You could even you could even just do a
[2:31:26]
per home estimate that more represents
[2:31:28]
the true cost to the city on a per
[2:31:30]
basis.
[2:31:32]
>> The person that's going to probably
[2:31:33]
administer I respect that.
[2:31:35]
>> But Jeeoff, I think first we need to
[2:31:36]
figure out where the utilities are
[2:31:37]
coming from. Are they coming from us?
[2:31:39]
Are they coming from Springville or are
[2:31:40]
they going to be split? Miss Springville
[2:31:41]
gonna cover their their portion and
[2:31:43]
we're gonna cover ours.
[2:31:44]
>> Yes.
[2:31:45]
>> Okay. So, Gordon's gonna have to but do
[2:31:47]
we have sufficient utilities for
[2:31:52]
Iron to go ahead and just fish down here
[2:31:55]
or is this going to be like a huge
[2:31:57]
undertaking?
[2:32:00]
>> That's Gordon.
[2:32:01]
>> Okay. Okay. So, we're providing water,
[2:32:04]
sewer, garbage,
[2:32:06]
um storm water, and electricity all to
[2:32:09]
the portion that's for Provo
[2:32:13]
>> and main street maintenance or
[2:32:17]
the main streets main arteries. Yeah.
[2:32:18]
>> Because there's how many how many public
[2:32:20]
streets are in this?
[2:32:21]
>> Aaron, would you put up the site plan?
[2:32:29]
So point to the city streets Aaron the
[2:32:32]
wider right so U do controls that then
[2:32:35]
our city streets are just uh mountain
[2:32:37]
Vista and Sierra Vista
[2:32:41]
>> so just those two
[2:32:42]
>> roads in between and the accesses to the
[2:32:44]
different units and commercial spots are
[2:32:46]
all private
[2:32:47]
>> even that big one
[2:32:49]
>> in the middle
[2:32:50]
>> the central one and the east west one
[2:32:52]
those would be private
[2:32:53]
>> really
[2:32:54]
>> it's just the curvy mountain vista and
[2:32:58]
then Yeah, correct.
[2:32:59]
>> It's basically what we already have.
[2:33:07]
» A quick question. So, Becky mentioned
[2:33:10]
sewer and electric and everything like
[2:33:12]
that, but we weren't including that in
[2:33:14]
the calculation because those are
[2:33:16]
services for which we already are
[2:33:19]
recouping the cost of providing it,
[2:33:21]
right? Like we charge the residential
[2:33:24]
for their trash cans, for electricity
[2:33:26]
and everything like that. Is that right?
[2:33:30]
>> That's correct. Plus, we're collecting
[2:33:32]
impact fees for those things. I would
[2:33:34]
hate to split with Springville our
[2:33:35]
impact fees.
[2:33:36]
>> So, let's be careful about how we
[2:33:39]
>> calculate this.
[2:33:40]
>> Yeah. And just to to be clear, the
[2:33:44]
existing public roads that we already
[2:33:47]
have an obligation to plow aren't
[2:33:50]
changing, and the new ones that are
[2:33:51]
going to be added will be private roads,
[2:33:53]
and we won't have an obligation to plow
[2:33:54]
them.
[2:33:55]
>> Correct.
[2:33:56]
>> Okay. Thanks,
[2:33:58]
>> mayor.
[2:33:59]
>> I was just going to say in reference to
[2:34:01]
the school district, they would like to
[2:34:02]
have more students. They are losing
[2:34:04]
funding because they don't have
[2:34:06]
>> students. This would increase property
[2:34:08]
tax. This would
[2:34:10]
>> and and it's not going to the reason
[2:34:12]
that they sometimes get frustrated if
[2:34:13]
we're adding students is if we are
[2:34:15]
giving a tiff because then we're taking
[2:34:17]
that increment.
[2:34:19]
>> This has none of that. This is school
[2:34:21]
district is not going to be bothered.
[2:34:23]
Well, I can't speak for them, but this
[2:34:24]
is not going to take money away from the
[2:34:26]
school district.
[2:34:26]
>> Well, but aren't property taxes included
[2:34:29]
in the net benefit calculation?
[2:34:32]
>> Yes.
[2:34:32]
>> So, so but it's just our portion of the
[2:34:35]
school district will always get their
[2:34:36]
portion that and they're they're not in
[2:34:38]
the Okay.
[2:34:40]
>> And they would get the rate of pupil
[2:34:42]
unit in addition. So, I I just I don't
[2:34:44]
know that would be I'm not saying we
[2:34:47]
shouldn't add that all the costs and
[2:34:48]
benefits from that into it. I'm just
[2:34:50]
saying that more of a benefit than
[2:34:52]
>> I think it is a good point, but what I
[2:34:53]
was looking at is you get more property
[2:34:55]
tax off of a business than you do off of
[2:34:57]
a home,
[2:34:58]
>> right? And so Springville is necessar
[2:35:01]
they're not educating unless they go out
[2:35:04]
of area to Nebo School District. They're
[2:35:07]
not educating any kids and they're
[2:35:09]
getting all that all those taxes. I
[2:35:11]
completely agree. I just I think we have
[2:35:13]
to consider what else would go here.
[2:35:15]
Also, I I mean
[2:35:18]
>> Yeah. It's a delegate. It's a delegate
[2:35:20]
balance because we're we're trying to
[2:35:22]
negotiate
[2:35:24]
the best deal for the city but and not
[2:35:26]
kill the deal. So that's the balance,
[2:35:27]
right?
[2:35:28]
>> And the school district has to negotiate
[2:35:30]
their deal with them. But you know if
[2:35:32]
we're looking at interlocal agreement
[2:35:33]
that was my point is you know maybe
[2:35:36]
that's something they need to consider
[2:35:38]
is a nebo provo negotiation as well
[2:35:43]
because this is going to be a provo
[2:35:46]
spring negotiation for our portion
[2:35:50]
>> and based on my analysis it's about 33%
[2:35:52]
more productive to have this mixed use
[2:35:54]
in this area versus the PIC what could
[2:35:57]
potentially be developed and that is if
[2:35:59]
it was there right now. um the burning
[2:36:01]
hand is what to in the bush. We don't
[2:36:03]
know what would develop in this area or
[2:36:06]
when. So
[2:36:07]
>> yeah, I think it's a good point.
[2:36:10]
>> So we will have the interlocal agreement
[2:36:12]
discussion tonight
[2:36:15]
first and and then we'll go from there.
[2:36:19]
>> Makes sense?
[2:36:20]
>> Okay.
[2:36:22]
Any other comments?
[2:36:25]
>> Okay.
[2:36:26]
>> All right. Thank you, Erin. Sorry, I was
[2:36:29]
trying to unmute. Um, I'm planning on
[2:36:31]
being there tonight, but if I'm not able
[2:36:33]
to speak for some reason, I want to be
[2:36:36]
echoing the concerns that Jeff has
[2:36:38]
raised. So, just know that you're
[2:36:40]
doubling his vote there.
[2:36:43]
>> Still just one
[2:36:43]
>> bubble. You're at one and a half Tim.
[2:36:47]
[clears throat]
[2:36:47]
>> Yeah. Is that
[2:36:50]
» So, let's see. Um, [clears throat]
[2:36:54]
Rachel, it's it's number seven on the
[2:36:56]
agenda. You have you have the agenda,
[2:36:58]
right?
[2:37:03]
» So, just
[2:37:04]
>> Yeah, I've got it. I I'll be watching
[2:37:06]
it. We'll see how it goes.
[2:37:08]
>> On that note, Gary, those were supposed
[2:37:10]
to be at the beginning. I just noticed
[2:37:12]
that mistake. The Springville needs to
[2:37:14]
be the beginning for both Craig and I so
[2:37:18]
that we can get off and do
[2:37:21]
>> Councelor McKay. They are towards the
[2:37:23]
beginning originally. Um item.
[2:37:28]
So we have items two, three, four,
[2:37:32]
and then five.
[2:37:34]
>> The chair notes I'm looking at say it's
[2:37:36]
15 and 16.
[2:37:38]
>> Oh yeah,
[2:37:39]
>> it's item seven right now.
[2:37:41]
>> It's seven, eight, and nine right now.
[2:37:42]
>> Okay, good.
[2:37:44]
>> Yeah, it got bumped up.
[2:37:46]
>> That works. Thank you.
[2:37:49]
>> Okay, very good. All right, we'll take a
[2:37:53]
break.
[2:37:54]
and reconvene at 2:30 in 7 minutes.
[2:38:01]
» Recording stopped.
[2:38:09]
» Recording in progress.
[2:38:12]
>> Okay, we'll reconvene our council work
[2:38:14]
session.
[2:38:16]
Yeah.
[2:38:19]
>> Our next item is a discussion regarding
[2:38:31]
the Vesper Amphitheater. We'll turn the
[2:38:33]
time to Brian Bales. Bailis,
[2:38:37]
the Vesper project manager. We welcome
[2:38:39]
others.
[2:38:44]
» Brian, welcome.
[2:38:47]
>> [clears throat]
[2:38:52]
» Perfect. Um, I was told, Kevin, are we
[2:38:57]
um are we going to have other people
[2:38:59]
begin the presentation or am I am I
[2:39:01]
going to start? I was told that there
[2:39:03]
might be a few other people that would
[2:39:04]
be presenting before us.
[2:39:08]
Have you
[2:39:10]
>> Okay, fantastic.
[2:39:13]
there.
[2:39:16]
>> And so,
[2:39:21]
is there a way to share my screen?
[2:39:37]
» Perfect.
[2:39:39]
And just so you know, um, Brian and
[2:39:41]
members of your team, um, three council
[2:39:43]
members are joining us via Zoom today
[2:39:45]
who are traveling. Craig Christensen,
[2:39:49]
>> Rachel, Whipple,
[2:39:51]
>> and Katrice M.
[2:39:55]
Everybody's here.
[2:39:59]
» Fantastic. Thank you. We appreciate the
[2:40:00]
opportunity to to present. Um,
[2:40:05]
okay. How do I minimize that guy? There
[2:40:08]
we go. Okay, I think we're ready.
[2:40:16]
Okay. Yes. And the laser pointer. No.
[2:40:21]
How do we Is there a way to show our
[2:40:24]
screen on there?
[2:40:27]
>> So, we can share the presentation on
[2:40:30]
Zoom what it looks like, but this screen
[2:40:32]
is connected to this computer.
[2:40:36]
That actually complicates Can their can
[2:40:38]
their presentation be emailed to you and
[2:40:40]
you could pull it up for them and flip
[2:40:41]
through for them?
[2:40:43]
>> Yes.
[2:40:45]
Was it like 200 megs
[2:40:47]
>> like at least
[2:40:49]
>> do we have ability to use a flash drive
[2:40:51]
to trans to trans
[2:40:56]
» computer?
[2:40:58]
I think we want to see his presentation
[2:41:00]
especially it's a big part of
[2:41:02]
>> I agree.
[2:41:03]
>> Can you zoom in on your
[2:41:05]
>> computer? Can you just bring up
[2:41:15]
if we share the screen on yours then I
[2:41:17]
can open Zoom here
[2:41:19]
>> and make this
[2:41:21]
>> right now sharing screen so people
[2:41:28]
» let me help you set up the screen share
[2:41:30]
there and then yeah that's a great idea
[2:41:32]
guys
[2:41:34]
>> yeah I'm Sorry.
[2:41:39]
» No, it's fine. Technical limitations
[2:41:42]
should be communicated.
[2:41:44]
>> All right. Well, if if it falls on
[2:41:46]
somebody, it falls on me, Travis, not
[2:41:47]
these guys. They'll be great to
[2:41:48]
communicate. Oh, no worries.
[2:41:51]
It should be good to on my computer.
[2:41:54]
It's saying the same thing like that.
[2:41:56]
[clears throat] I'm also sharing.
[2:42:02]
Can you see his screen from my computer?
[2:42:13]
» Oh, wonderful.
[2:42:14]
>> Fantastic.
[2:42:16]
>> Solution.
[2:42:18]
>> Thank you.
[2:42:19]
>> Good job.
[2:42:20]
>> All righty.
[2:42:22]
Okay. Um, we are so excited to be here.
[2:42:25]
This has been a long road to get here
[2:42:27]
and um there's been a lot of information
[2:42:29]
um shared and we're just excited to be
[2:42:31]
in front of you having this
[2:42:32]
conversation. I think if there were a
[2:42:35]
couple of objectives we hope to
[2:42:36]
accomplish today, it would be to walk
[2:42:38]
away um from this conversation with a
[2:42:41]
very clear understanding of what
[2:42:43]
additional information is needed for you
[2:42:44]
to feel comfortable making this making
[2:42:46]
this very very important decision for
[2:42:48]
Vasper. Um so we've got a lot of new
[2:42:50]
information to share with you. Um, and
[2:42:52]
so we'll we'll get right into it. Um, we
[2:42:56]
appreciate the countless hours and
[2:42:57]
attention and careful consideration
[2:42:59]
you've already given the project. You
[2:43:01]
guys have read a lot of emails. Uh,
[2:43:03]
you've looked at a lot of things to get
[2:43:05]
to where we're at. We recognize this is
[2:43:07]
a significant and consequential proposal
[2:43:09]
and we appreciate the responsibility
[2:43:10]
that places on each of you. Vesper is a
[2:43:13]
big bold project. It has the potential
[2:43:16]
to affect PROBO in meaningful ways. We
[2:43:18]
understand that a project of this scale
[2:43:20]
deserves careful scrutiny and we also
[2:43:22]
believe that that scrutiny has made the
[2:43:23]
project better. The project before you
[2:43:25]
today is meaningfully different from
[2:43:27]
where we started. Community input has
[2:43:29]
mattered, city staff input has mattered,
[2:43:32]
council feedback, our conversations with
[2:43:34]
doorum and other interested parties have
[2:43:36]
also resulted in meaningful changes. Um,
[2:43:39]
we have made significant adjustments to
[2:43:41]
the project itself and strengthened the
[2:43:43]
commitments and protections around it.
[2:43:45]
We want to show you where those changes
[2:43:47]
have led us. Um, we see today um not
[2:43:50]
simply as a presentation, but we hope to
[2:43:52]
accomplish two things. To show you where
[2:43:54]
Vesper stands today and to learn where
[2:43:56]
your concerns, questions, or additional
[2:43:58]
work still remain. We want to leave
[2:44:00]
today with a better understanding of
[2:44:01]
what each of you needs in order to
[2:44:03]
determine the best path forward. We have
[2:44:06]
prepared a structure so we can work
[2:44:08]
through the issues in a logical order.
[2:44:10]
At the same time, we want this to be
[2:44:11]
interactive and flexible. We will pause
[2:44:13]
at the end of each major section for
[2:44:15]
discussion. And if something needs
[2:44:16]
clarification as we go, please jump in.
[2:44:19]
If there is an issue that you want to
[2:44:20]
spend more time on, we're prepared to do
[2:44:22]
that. First, we want to show you where
[2:44:25]
Vesper stands today, how it has changed.
[2:44:27]
Then we'll walk through the major public
[2:44:29]
benefits and the physical transformation
[2:44:31]
of the property. We would like to review
[2:44:33]
the important economic and fiscal impact
[2:44:35]
of Ves Vesper. From there, we want to
[2:44:37]
work through the substantive issues,
[2:44:39]
traffic, parking, sound, scale, and
[2:44:41]
long-term protections. We will then talk
[2:44:44]
specifically about the development
[2:44:45]
agreement and the distinction between
[2:44:46]
what is being committed to now and what
[2:44:48]
appropriately remains subject to later
[2:44:50]
technical review. After we after we've
[2:44:53]
worked through Vesper itself, we want to
[2:44:54]
shift separately to the real estate
[2:44:56]
purchase agreement. We know each of you
[2:44:58]
have strong views about that
[2:44:59]
transaction, and we specifically want
[2:45:01]
your feedback on it. We want to make
[2:45:03]
sure we first understand the project
[2:45:04]
itself before we finally get into the
[2:45:06]
real estate discussion and let that kind
[2:45:08]
of take over the meeting. Finally, we
[2:45:10]
want to identify any remaining concerns
[2:45:12]
that the work and work that needs to
[2:45:14]
happen from here.
[2:45:16]
So, the vision for Vesper has come from
[2:45:18]
the ownership leadership team. The
[2:45:20]
technical information we're presenting
[2:45:21]
has been developed with experienced
[2:45:23]
local professionals in architecture,
[2:45:25]
engineering, legal, finance, and venue
[2:45:27]
operations. As we move through the
[2:45:29]
specific topics, we will introduce the
[2:45:31]
members of the team who have led that
[2:45:33]
work and we'll help them uh and we'll
[2:45:35]
let them answer the detailed questions
[2:45:37]
that you might all have. With that
[2:45:38]
framework in mind, I'd like to start by
[2:45:40]
showing you where Vesper stands today
[2:45:42]
with the project what the project how
[2:45:43]
the project has changed through this
[2:45:45]
process and what the project before you
[2:45:46]
now actually looks like. So these um
[2:45:50]
before we get into the individual
[2:45:52]
issues, it's important to share where
[2:45:53]
the project stands today compared to
[2:45:55]
where we started. The project before you
[2:45:58]
today is materially different from the
[2:46:00]
original concept. The review process has
[2:46:02]
resulted in meaningful changes to the
[2:46:04]
actual project framework, not just the
[2:46:06]
presentation. The original amphitheater
[2:46:08]
was 25,000 capacity, which has been
[2:46:10]
capped today at 20,000. That is a 20%
[2:46:13]
reduction in maximum capacity. We have
[2:46:16]
also narrowed the uses that can occur on
[2:46:18]
the property. Rather than creating broad
[2:46:20]
future development rights, the
[2:46:21]
development agreement defines the uses
[2:46:23]
that are permitted and ties the property
[2:46:25]
to the Vesper project and its supporting
[2:46:27]
uses. Parking has also been constrained.
[2:46:30]
Instead of allowing surface parking to
[2:46:31]
simply grow with demand, surface parking
[2:46:33]
is capped at 15 acres that has pushed us
[2:46:36]
toward a more thoughtful transportation
[2:46:38]
strategy using internal queuing,
[2:46:40]
rightsized on-site parking, off-site
[2:46:43]
parking, shuttles, ride share, and other
[2:46:45]
transportation options. The conservation
[2:46:47]
component has become more specific. We
[2:46:49]
now have defined obligations around
[2:46:51]
undeveloped property, restoration,
[2:46:54]
revitation, public trails, and permanent
[2:46:56]
conservation. Traffic and parking have
[2:46:58]
also been moved from a concept
[2:47:00]
discussion to an enforceable
[2:47:01]
requirement. Before large-scale
[2:47:03]
operations can begin, the project must
[2:47:05]
have an approved traffic and parking
[2:47:07]
operations plan and obtain the
[2:47:09]
applicable city and agency approvals.
[2:47:11]
More broadly, many of the exceptions
[2:47:13]
that began as project intentions are now
[2:47:15]
being incorporated into an enforcable
[2:47:17]
development agreement.
[2:47:19]
I want to emphasize that these are not
[2:47:21]
simply refinements to how we are
[2:47:22]
describing Vesper. Rather, these are
[2:47:24]
changes to the actual rights, limits,
[2:47:26]
and obligations that will govern the
[2:47:27]
project. Vesper remains a bold project.
[2:47:30]
We have we have tried to make it we have
[2:47:32]
not tried to make it small or
[2:47:34]
insignificant. What we have tried to do
[2:47:35]
is responsibly bound the project while
[2:47:37]
preserving the things that make the
[2:47:39]
opportunity meaningful. And so um I
[2:47:42]
guess before we before we move on to the
[2:47:44]
public benefits and the individual
[2:47:45]
technical issues and the financial the
[2:47:47]
fiscal impacts, are there any changes um
[2:47:50]
on this sheet that you would like us to
[2:47:52]
clarify or are we are we generally on
[2:47:54]
the same page?
[2:47:59]
I'm not okay with a lot of things, but I
[2:48:01]
mean to ask this is pretty broad,
[2:48:04]
especially when we got materials
[2:48:06]
yesterday
[2:48:08]
night that we haven't had time to look
[2:48:09]
at.
[2:48:10]
>> Yeah.
[2:48:11]
>> Why? Why is that?
[2:48:12]
>> Why is what
[2:48:13]
>> that we got these materials yesterday
[2:48:15]
instead of uh last week?
[2:48:16]
>> Um well, because we were finalizing that
[2:48:20]
uh financial the fiscal and economic
[2:48:22]
impact study. um that information was
[2:48:25]
coming in as recently as like yesterday.
[2:48:27]
So we were working through those issues
[2:48:29]
with Benj Becker to make sure that that information was accurate.
[2:48:32]
>> So the date stamp on that for the 24th
[2:48:35]
of July is not accurate.
[2:48:36]
>> That is not accurate. No. So that was
[2:48:39]
the when the original report was
[2:48:41]
prepared, but there's been a lot of
[2:48:42]
interaction since then that we've had to
[2:48:44]
verify and clean up and make sure was
[2:48:46]
accurate.
[2:48:47]
>> So I'm not I haven't had time to review
[2:48:50]
that yet.
[2:48:51]
>> Yeah. And I'm not going to tell you that
[2:48:53]
everything on here is going to be okay.
[2:48:55]
I've got to have time to prep before I
[2:48:57]
can
[2:48:58]
>> Yeah, we're not asking for you to say
[2:48:59]
everything is okay, Becky. Absolutely.
[2:49:01]
That's that's that's not what we're
[2:49:02]
asking for today. We just wanted to see
[2:49:04]
if there were any inconsistencies that
[2:49:06]
you saw there that you wanted to have um
[2:49:07]
a specific discussion about. In other
[2:49:09]
words, councelor Bogden, issues,
[2:49:12]
questions that you expect to raise
[2:49:14]
today, are are they included in these
[2:49:15]
topics or are there other things that
[2:49:18]
you anticipate might not be included
[2:49:20]
here?
[2:49:22]
>> Yes, there are questions that I would
[2:49:24]
have with these topics. Yes.
[2:49:28]
» How how much of your pre uh
[2:49:32]
>> ho how long is your presentation?
[2:49:34]
>> Um quite a bit,
[2:49:35]
>> I would say. Yeah. I mean,
[2:49:37]
>> then I would say let's go ahead and get
[2:49:39]
through the presentation and
[2:49:41]
>> we can see what it addresses, what it
[2:49:42]
doesn't address. That's just my two
[2:49:44]
cents. I'm only one of seven council
[2:49:45]
members, but I would say let's see what
[2:49:47]
you have to say and then I think that'll give Becky an idea of what's not
[2:49:51]
covered and
[2:49:52]
>> Okay, so let's let's do it then. That's
[2:49:54]
great. Um, we start with the fiscal
[2:49:56]
impact, Becky. That's the report that
[2:49:58]
was submitted yesterday. Um, so at a
[2:50:00]
very high level, these are the numbers
[2:50:02]
that we are just going to walk through
[2:50:04]
really quickly. Um, we've actually had
[2:50:05]
some pretty extensive conversations with
[2:50:07]
um, Cody Hill on the on the community
[2:50:10]
development side. Um, and we've kind of
[2:50:12]
coordinated a little bit on those
[2:50:13]
numbers to make sure we weren't looking
[2:50:14]
at things inaccurately. That was part of
[2:50:16]
the coordination that needed to happen,
[2:50:17]
Becky, and that was one of the reasons
[2:50:18]
why the delay took place. But these are
[2:50:20]
the highle assumptions. So, we've got
[2:50:22]
$540 million. Um, let's see. At the most basic level,
[2:50:29]
Vesper represents more than 540 million
[2:50:31]
of initial uh private construction
[2:50:34]
investment in Provo. Piper Sandler
[2:50:36]
estimates that construction activity
[2:50:38]
could generate approximately 864 million
[2:50:41]
in total economic impact based on a
[2:50:43]
multiplying factor. Um that's very
[2:50:46]
consistently applied. That's where you
[2:50:47]
get that 864 million. So these are the
[2:50:49]
two two numbers. 840 million is based on
[2:50:52]
direct construction costs and the 864
[2:50:56]
million is based on a multiplying factor
[2:50:57]
that that is typically and generally
[2:50:59]
accepted as an industry standard um for
[2:51:02]
the construction impacts that had that
[2:51:03]
they have on the general region. Um the
[2:51:06]
fiscal impact to Provo um Piper Sandler
[2:51:10]
projects uh the number that I think is
[2:51:13]
most relevant to the council is the net
[2:51:15]
fiscal impact to Provo. Piper Sandler
[2:51:17]
did not simply calculate the taxes the
[2:51:19]
project could generate. They also
[2:51:21]
modeled additional city expenses
[2:51:23]
associated with the project and the new
[2:51:25]
population expected to result from the
[2:51:26]
employment it creates. After accounting
[2:51:29]
for these projected costs, the their
[2:51:31]
analysis concludes that Vesper would
[2:51:33]
generate an average positive net fiscal
[2:51:35]
impact to Provo of approximately 2.3
[2:51:38]
million per year. And over a 30-year
[2:51:41]
period, 30-year analysis period, that
[2:51:43]
equates to approximately 67.2 2 million
[2:51:46]
of cumulative net benefit to the city.
[2:51:49]
The analysis also assumes that event
[2:51:52]
specific police, fire, and emergency
[2:51:54]
service costs attributable to Vesper are
[2:51:57]
reimbursed by Vesper rather than
[2:51:58]
becoming an ongoing burden for on the
[2:52:00]
city. As with any 30-year projection,
[2:52:03]
these are estimates, not guarantees. The
[2:52:06]
analysis relies on the project's current
[2:52:07]
land use phasing, employment, and
[2:52:10]
financial assumptions, and actual
[2:52:12]
results will depend on how the project
[2:52:14]
develops and operates. But the
[2:52:16]
conclusion of the analysis is clear.
[2:52:18]
Under the current project assumptions,
[2:52:19]
Piper Sandler expects the economic
[2:52:21]
activity and new revenues generated by
[2:52:23]
Vesper to substantially exceed the
[2:52:26]
incremental costs to Provo. Um, so these analyses kind of looked at both
[2:52:33]
the property tax impacts. So that's one
[2:52:36]
kind of component that they look at to
[2:52:37]
come up with the total $2.3 million and
[2:52:39]
then they look at the point of sales
[2:52:40]
impacts as well. And so that's where you
[2:52:42]
come up with that $2.3 million of
[2:52:45]
additional uh net fiscal benefit to
[2:52:47]
Provo. So um, what questions h how do we want to break this down? Do we
[2:52:53]
want to get into the specifics of this
[2:52:54]
or are we good to just keep moving
[2:52:56]
forward?
[2:52:58]
>> A [clears throat] quick question. Did
[2:52:59]
you do the the fiscal impact for ORM as
[2:53:03]
well because it's so close?
[2:53:05]
>> We did not. No, we did not do the fiscal
[2:53:08]
impact to ORM. These would be regional
[2:53:10]
impacts. So, I would say it's all
[2:53:12]
inclusive in these numbers. Um, so there
[2:53:14]
would be a there would be an impact to
[2:53:16]
Provo. This was specific to Provo.
[2:53:18]
Excuse me. The $2.3 million is specific
[2:53:20]
to Provo. and uh and then there would be
[2:53:22]
additional impacts to ORM and the in the
[2:53:24]
surrounding region. But no, we did not
[2:53:26]
look at ORM specifically. These are just
[2:53:27]
provo numbers.
[2:53:29]
>> But you did have some numbers for the
[2:53:30]
county as I recall in there.
[2:53:32]
>> Yep.
[2:53:35]
>> So, do you have a breakout of this?
[2:53:37]
>> Well, that this this is provos in in
[2:53:40]
this um study. They had some numbers for
[2:53:42]
the county as well where they I think it
[2:53:44]
was $6 million regionally that they
[2:53:46]
projected. So, of that 6 million, 2
[2:53:48]
million is for Provo. The other four
[2:53:50]
million would be for other parts of the
[2:53:52]
county, right?
[2:53:53]
>> If I Don't quote me on that. I might
[2:53:55]
have.
[2:53:56]
>> Right. But 2.3 is broken down into
[2:53:59]
property tax and
[2:54:00]
>> Oh, you mean where's that all come from?
[2:54:02]
>> Yeah. Where's the breakdown?
[2:54:03]
>> I think it's in there.
[2:54:05]
>> It's in the report. Yeah. We didn't we
[2:54:07]
didn't get into that level of detail,
[2:54:08]
but I can pull up the report and we can go through that.
[2:54:10]
>> Well, we
[2:54:12]
like I said, I haven't had time to go
[2:54:13]
through it. I'm sure there's other
[2:54:14]
counselors that haven't either. And so
[2:54:17]
we probably should, like Travis said, go
[2:54:19]
through it and then give us time to
[2:54:21]
digest it and go through it because
[2:54:22]
there will be more questions once we see
[2:54:23]
those breakdowns.
[2:54:24]
>> Yeah, absolutely. Absolutely.
[2:54:30]
Okay.
[2:54:32]
Um
[2:54:35]
Okay,
[2:54:40]
so let's jump into um the next section
[2:54:43]
then.
[2:54:45]
Um
[2:54:47]
so that would be section four. So this
[2:54:50]
is the property transformation and
[2:54:51]
public benefits section of the of the
[2:54:53]
project. So um before we talk about the
[2:54:56]
amphitheater, I think it's important
[2:54:57]
that we start with the property itself.
[2:54:59]
This is not an untouched portion of
[2:55:02]
Provo Canyon. It is a longdisturbed
[2:55:04]
gravel operation at one of the most
[2:55:05]
visible gateways into into the canyon.
[2:55:15]
The opportunity is to reclaim and
[2:55:17]
improve a disturbed property rather than
[2:55:19]
develop a pristine canyon landscape. One
[2:55:21]
of the fundamental opportunities with
[2:55:23]
Vesper is to take a disturbed property
[2:55:25]
in such an iconic and important location
[2:55:27]
and create something significantly
[2:55:28]
better than what exists today.
[2:55:31]
Vesper um so this is the transformation.
[2:55:34]
So this is the site today and then this
[2:55:36]
is what um the new rendering uh the new
[2:55:39]
rendering um that we've got for the site
[2:55:41]
which really as you'll notice a lot of
[2:55:44]
the structures and and facilities don't
[2:55:47]
change that much. The change has been in
[2:55:49]
the site plan to really accommodate
[2:55:50]
traffic and access to the site. Um those
[2:55:53]
are the most important parts as well as
[2:55:55]
traffic and some other things. So we'll
[2:55:56]
get into the specifics of the site but
[2:55:58]
Vesper is not simply placing a venue on
[2:56:00]
the site. It creates an opportunity to
[2:56:02]
fundamentally improve the character and
[2:56:04]
function of the property. The project
[2:56:06]
would reclaim large portions of of of
[2:56:08]
the disturbed site. It introduces
[2:56:10]
restoration and reveation. The
[2:56:12]
architecture is intended to respond to
[2:56:14]
the canyon setting rather than ignore
[2:56:16]
it. The project creates a more
[2:56:18]
intentional gateway experience at the
[2:56:20]
entrance to Provo Canyon. The project
[2:56:23]
public trails, pedestrian connections,
[2:56:25]
conservation, and landscape restoration
[2:56:27]
are part of a broader site plan. The
[2:56:29]
venue itself is only part only one part
[2:56:31]
of the transformation. We want the
[2:56:34]
council to evaluate the complete site
[2:56:36]
outcome, not simply the stage um and
[2:56:39]
audience area. The goal is to take a
[2:56:41]
heavily altered industrial site and
[2:56:43]
convert it into a place that both serves
[2:56:45]
public and cultural function. The
[2:56:47]
question we have been trying to answer
[2:56:48]
is not simply whether an amphitheater
[2:56:50]
can fit here. It's whether this property
[2:56:52]
can be transformed in a way that
[2:56:53]
improves the Canyon Gateway, creates
[2:56:55]
meaningful public benefits, and does so
[2:56:58]
with long-term protections.
[2:57:01]
We think the difference uh between what
[2:57:03]
exists today and what can exist here is
[2:57:05]
one of the most important parts of the
[2:57:06]
Vesper story.
[2:57:09]
>> Um yeah, Becky,
[2:57:10]
>> go back to that slide.
[2:57:13]
Can you go back? Yeah. Okay. So, our
[2:57:15]
property there, you can see
[2:57:20]
» you can see the road that looks like
[2:57:22]
it's a dirt road currently today. What
[2:57:25]
What's going on with that?
[2:57:27]
>> What's going on with the dirt road
[2:57:28]
that's right here?
[2:57:30]
>> Yes. And it goes up. What are you doing
[2:57:32]
with that? I can't see that portion on
[2:57:35]
your drawings.
[2:57:37]
>> So, this is what this is what the
[2:57:38]
overall site plan, Becky, looks like.
[2:57:40]
Um, so we're kind of jumping into that
[2:57:42]
this part of the presentation, but let's go ahead and get there. Um,
[2:57:46]
there's a flat portion of the property
[2:57:48]
that is ideal for additional parking up
[2:57:50]
there on that site, Becky. So, that that
[2:57:52]
allows us that that's not a gravel road.
[2:57:55]
It's a paved road, and it allows us to
[2:57:57]
get additional traffic and parking up to
[2:57:59]
that site.
[2:58:00]
>> So, are we basically doing like a switch
[2:58:01]
back and a parking lot and a switch back
[2:58:03]
in a parking lot up there?
[2:58:04]
>> Uh, no, it wouldn't be a switch back. It
[2:58:06]
would be climbing It would be climbing
[2:58:08]
from from right here. It would be
[2:58:10]
climbing from the parking uh the parking
[2:58:12]
field up to that up to that site.
[2:58:14]
>> How come we've cut it [clears throat]
[2:58:15]
off? How come I can't see like the full
[2:58:17]
>> Oh, because because the parking solution
[2:58:20]
and event management system, this is a
[2:58:21]
big part of this conversation and it
[2:58:23]
just is is taken up on that uh to get it
[2:58:26]
to fit.
[2:58:27]
>> Is there a way that we can get what you
[2:58:29]
see going further up that hill?
[2:58:33]
like could you get us a more of a a
[2:58:36]
better site of what's going on up there?
[2:58:39]
>> Yeah. Yeah, for sure. Um, is the orange
[2:58:42]
that you see there is that that's the
[2:58:44]
parking you're talking about or would
[2:58:45]
there be additional parking beyond that
[2:58:46]
orange?
[2:58:47]
>> No. No, that's all the parking.
[2:58:49]
>> The orange comprises all of the parking,
[2:58:51]
Travis. Yeah, that right now shows 14
[2:58:53]
acres of surface parking on the site and
[2:58:56]
we're um in the development agreement.
[2:58:58]
We've committed to not exceeding 15
[2:58:59]
acres.
[2:59:01]
That's a there's a current road that
[2:59:02]
goes up that on the Provo City side.
[2:59:05]
>> Yeah,
[2:59:06]
>> there's a there's a current road that
[2:59:07]
goes up that side already.
[2:59:09]
>> Dirt, right?
[2:59:09]
>> Yep.
[2:59:10]
>> That's what I was talking about. That's
[2:59:11]
a dirt road already. And so what I can't
[2:59:13]
see is that an acres worth of parking
[2:59:15]
that you have up that dirt road. I can't
[2:59:18]
even see how that that looks. That's
[2:59:20]
part of why I wanted the elevations. I
[2:59:22]
wanted to see what was going on with
[2:59:24]
that.
[2:59:24]
>> Yeah.
[2:59:25]
>> That hillside.
[2:59:26]
>> Yeah. Yeah. No, that's
[2:59:26]
>> And I can't I can't see that in any of
[2:59:28]
the rendering. I I appreciate the
[2:59:30]
renderings because I did ask for them. I
[2:59:32]
think it was Craig and I that asked for
[2:59:33]
them,
[2:59:34]
>> but I can't see what's going on in any
[2:59:36]
of this. And then if we go back,
[2:59:38]
>> some of the stuff that was pointed out
[2:59:40]
to me through
[2:59:41]
>> my communications with ORM city council.
[2:59:44]
>> Uhhuh.
[2:59:44]
>> We've got that roundabout there and then
[2:59:46]
we've got a flyway. Nope.
[2:59:49]
>> The round the other roundabout right
[2:59:51]
there.
[2:59:51]
>> Yeah. Then we've got a flyway coming
[2:59:53]
from their parks and stuff like that.
[2:59:55]
One of the concerns they had is Vesper
[2:59:58]
people parking at their parking lots and
[3:00:01]
walking across that flyway, right?
[3:00:03]
>> What What have we got in plan for
[3:00:05]
protecting some of those or parks? And
[3:00:07]
why why do we have that going over that
[3:00:09]
far anyway?
[3:00:10]
>> This this fly over.
[3:00:12]
>> Yes, it's starts here
[3:00:16]
at this roundabout parks and it flies
[3:00:19]
over there. Right.
[3:00:20]
>> Right. That's just to get access to that
[3:00:22]
parking structure there, Becky. in order
[3:00:24]
to get so there will not be access
[3:00:27]
there. So part of one of one of the UD
[3:00:29]
do uh one of the UD do concerns that
[3:00:31]
they've had Becky is the left turns. So
[3:00:33]
if you're coming if you're coming out of
[3:00:35]
Provo and Oram and you're going up 189
[3:00:38]
taking a left turn into the Canyon View
[3:00:40]
Park um as well as Mount Tanogus Park,
[3:00:42]
those are problematic left turns. And so
[3:00:45]
one of the things that UD do has
[3:00:46]
consistently said all along is they
[3:00:48]
would like to if possible get rid of
[3:00:50]
those left turns. And so right now the
[3:00:53]
left turn to get into Canyon View Park
[3:00:56]
goes away the way that it exists right
[3:00:58]
now, which it would be located about
[3:01:00]
right there. And we've we've met
[3:01:01]
extensively with the ORM city council
[3:01:03]
and the provo and the mayor uh Karen
[3:01:05]
McCandless here the last couple of
[3:01:07]
weeks. So we've been able to clarify a
[3:01:08]
lot of this information with them,
[3:01:10]
Becky. Um but right now if you were
[3:01:12]
coming in and you wanted to go over to
[3:01:13]
the Canyon View Park, you'd come in uh
[3:01:16]
on Vesper. Probably the better exhibit
[3:01:18]
is to go to this one.
[3:01:20]
Okay. Okay. So, essentially what you're
[3:01:22]
doing is you're you're it's a it's an
[3:01:24]
ancillary benefit of this is you're
[3:01:27]
creating a left-hand turn into the park.
[3:01:29]
>> That's right.
[3:01:30]
>> This it's not to accommodate the Vesper
[3:01:34]
>> um no
[3:01:35]
>> concert traffic.
[3:01:36]
>> No.
[3:01:36]
>> Okay.
[3:01:37]
>> No, it's not to accommodate the V vesper
[3:01:39]
concert traffic. And ORM ORM ORM has has
[3:01:42]
liked the fact that I mean we we've been
[3:01:44]
communicating with ORM some of the
[3:01:45]
things that they need on their park. One
[3:01:47]
of the concerns that they've had, the
[3:01:48]
two two major concerns that they've had
[3:01:50]
is just policing. So, we've kind of had
[3:01:52]
conversations with them about policing
[3:01:53]
and and making sure we're patrolling and
[3:01:56]
we're offsetting their additional costs
[3:01:57]
to this. The other big concern that
[3:01:59]
they've had is just what happens to the
[3:02:00]
park if they have in the event of a
[3:02:03]
concert and they have a they have a
[3:02:05]
wedding or something, a reception there,
[3:02:06]
what happens? And so we've been
[3:02:08]
coordinating with them to say we would
[3:02:10]
probably just rent the entire park out
[3:02:12]
as one potential solution is that we
[3:02:14]
would rent the park out for the nights
[3:02:15]
that we have those major concert events
[3:02:17]
and then we would just manage all of
[3:02:18]
that. We would manage the parking. We
[3:02:20]
would manage we would use their facility
[3:02:22]
to allow people to arrive. Yeah. So all
[3:02:24]
of those things are very much on the
[3:02:25]
table. Spencer.
[3:02:26]
>> So that's their their parking issue is
[3:02:29]
that you would just rent it out and then
[3:02:30]
allow your people to park and then cross
[3:02:32]
that
[3:02:32]
>> correct
[3:02:33]
>> flyway. That that flyway is really
[3:02:35]
important, Becky. That's another I would
[3:02:36]
say of the two most important things
[3:02:38]
that UD do has consistently said, it's
[3:02:40]
getting rid of those left turns.
[3:02:42]
>> Well, number one, it's safety and
[3:02:44]
efficiency. Those are the two major
[3:02:45]
priorities by far and away. Then, as
[3:02:47]
kind of a subtitles or or kind of
[3:02:49]
details, additional details to the
[3:02:51]
project, it's number one, getting rid of
[3:02:53]
those left turns into both of those
[3:02:54]
parks. And then number two, it's making
[3:02:56]
sure we have a pedestrian crossing to
[3:02:59]
get from Provo River Trail and and the
[3:03:01]
Bonavville Shoreline Trail and some kind
[3:03:03]
of a crossing over 189 safely into the
[3:03:06]
site. So those are those are all
[3:03:07]
important components to this and that's
[3:03:08]
where you see that dashed green line
[3:03:10]
right there. Becky, that's an important
[3:03:12]
part of this overall project. Spencer
[3:03:14]
>> Ryan, just let me reiterate, UD do
[3:03:16]
really doesn't want lefts or rights that
[3:03:19]
are crossing the road. So they wanted us
[3:03:22]
to work with ORM city and even to the
[3:03:26]
point that Oram city on their very far I
[3:03:30]
don't know if you call that north or
[3:03:31]
east of where the pond is just above the
[3:03:34]
pond where you enter their park to the
[3:03:37]
point that they want us to try to
[3:03:39]
connect our on ramp so that there isn't
[3:03:43]
a lefthand turn going up to Heber from
[3:03:45]
that position. So the really is this is
[3:03:49]
kind of a global effort to work with Orm
[3:03:52]
City and us to try to help take away all
[3:03:56]
of the left and right-hand turns that
[3:03:58]
were cross traffic.
[3:04:02]
So um Becky, that that overpass is one
[3:04:05]
of these public benefits that we're we
[3:04:07]
were going to kind of get into the
[3:04:08]
details of. Sorry, Commissioner Bogdan.
[3:04:11]
Uh Council Member Boggden. Um, so that
[3:04:14]
overpass right now we're currently
[3:04:15]
planning on it be being three lanes.
[3:04:17]
of traffic. One of the
[3:04:19]
middle lane would be birectional. So one
[3:04:21]
lane would be going, one lane would be
[3:04:24]
coming and then the middle lane would be
[3:04:25]
birectional based on the traffic flow.
[3:04:27]
So on the way in you would have two
[3:04:29]
lanes of traffic coming in and then on
[3:04:30]
the way out you would have two lanes of
[3:04:31]
traffic going out. The third the fourth
[3:04:33]
component to that would be the
[3:04:35]
pedestrian crossing. So we would have uh
[3:04:37]
hikers and bikers that could get back
[3:04:39]
and forth across that bridge very very
[3:04:41]
easily which again from Vesper getting
[3:04:43]
them over to those two parks. There's a
[3:04:45]
lot of really cool amenities that are
[3:04:46]
over there and likewise we think people
[3:04:48]
will be coming from those parks over to
[3:04:49]
Vesper. So those connections are all
[3:04:51]
very very critically important for what
[3:04:52]
we're what we're talking about with the
[3:04:54]
site.
[3:04:55]
>> Um so uh Becky you you did you did also
[3:05:00]
ask about the elevations. um we would
[3:05:03]
like to those were in the report. These
[3:05:06]
are these are the elevations and it
[3:05:08]
doesn't show on the lefth hand side
[3:05:09]
there where that where that um where
[3:05:11]
that parking lot is that additional
[3:05:12]
parking lot would be you know right over
[3:05:14]
here or something like that. So we can
[3:05:15]
absolutely do a better job of showing
[3:05:17]
where that's at. This exhibit does kind
[3:05:20]
of show it. Um again this cuts the site
[3:05:24]
in in half north to south. And so let's
[3:05:27]
spend a few minutes looking at this
[3:05:28]
exhibit because it contains a lot of
[3:05:29]
information that I feel like is really
[3:05:31]
important, but it does show that parking
[3:05:33]
lot kind of um uh up the hill there. Um
[3:05:36]
and so that's what that would look like.
[3:05:38]
Um the reason why this elevation is so
[3:05:40]
important because it does kind of show
[3:05:42]
the distance. You know, that road is
[3:05:44]
loud out there. Um if you go out there
[3:05:46]
and you look at the the the decibel
[3:05:48]
reading from the road, it's it's hard to have a conversation at the
[3:05:52]
Canyon View Park when you're sitting at
[3:05:53]
the pavilion across across the way
[3:05:55]
there. Um, and so we want we felt like
[3:05:58]
that was important to be able to have
[3:05:59]
that that elevation separation from the
[3:06:01]
road. And so you come up to the parking
[3:06:03]
and you've got the surface parking
[3:06:04]
there. Then you've got additional
[3:06:06]
structures here which would include all
[3:06:08]
of the concessions and the merch uh will
[3:06:11]
call some of those types of of uses.
[3:06:13]
Then you'd have a plaza that would be
[3:06:15]
again significantly screened and
[3:06:17]
buffered from the road. And then you'd
[3:06:19]
have this is where the stage would be
[3:06:20]
located and then the stage and the
[3:06:22]
amphitheater would be from there. So
[3:06:24]
right now we are asking for an exception
[3:06:27]
um of the height restriction up of up to
[3:06:31]
125 ft for the fly loft and performance
[3:06:34]
related uh operations of the project. So
[3:06:37]
this elevation again I think really
[3:06:39]
clearly shows you know the amphitheater
[3:06:41]
itself uh maybe exceeds the 125 foot
[3:06:44]
height just a little bit. Um but then it
[3:06:46]
really provides a lot of space needed to
[3:06:48]
separate us from the road and the other
[3:06:50]
ambient noise with the river and some of
[3:06:52]
those other things to get up to the
[3:06:53]
actual amphitheater itself. So the
[3:06:54]
performers aren't being impacted by the
[3:06:56]
road and some of those other noises. Uh
[3:06:58]
so it's a great experience for the
[3:06:59]
guests and the performers.
[3:07:01]
>> Brian, why is that an exception? What's
[3:07:03]
the current height requirement? The
[3:07:05]
current height for SC3 right now is 75
[3:07:08]
ft.
[3:07:08]
>> Okay. So,
[3:07:09]
>> so we we are committing because one of
[3:07:12]
the concerns again from the public and
[3:07:13]
other folks has been one of the things
[3:07:15]
that we are committing to is to restrict
[3:07:16]
that further from 75 down to 50.
[3:07:19]
>> So, right now in the development
[3:07:20]
agreement, our height for all buildings
[3:07:22]
with the exception of these these
[3:07:24]
structures that we just talked about are
[3:07:26]
50 feet.
[3:07:27]
>> And that that includes the hotel, that
[3:07:28]
includes everything that we've talked
[3:07:30]
about the any of the retail, any of
[3:07:31]
those any of those types of uh any of
[3:07:33]
those types of uses. hotel, retail, um
[3:07:36]
maintenance buildings, all of that. 50
[3:07:38]
feet will be the height uh limitation
[3:07:40]
except for again the fly loft. And then
[3:07:43]
this structure is um is uh it's kind of
[3:07:47]
like you can take it off, you can expand
[3:07:49]
it in the in the summer months and then
[3:07:52]
in the winter months you can take that
[3:07:53]
off. So it's it's uh that structure
[3:07:56]
right there might need to be adjusted
[3:07:57]
and be a little bit higher than the 50
[3:07:58]
ft requirement. So, we can go up to 125
[3:08:01]
ft on that structure as well, just so
[3:08:03]
that it's not impacting the guests view
[3:08:05]
of the performers as you get into the
[3:08:07]
amphitheater. Jeff,
[3:08:09]
>> what what is the height from the road
[3:08:12]
elevation to that first uh basically the
[3:08:15]
level of the parking lot?
[3:08:17]
>> I would say it's 30 feet, although I
[3:08:19]
don't know that I have that number right
[3:08:21]
off the top of my the tip of my tongue.
[3:08:23]
>> Okay.
[3:08:24]
>> Um but yeah, we could we could get that
[3:08:25]
number.
[3:08:26]
>> Probably pretty close to 30 feet.
[3:08:28]
>> Thank you. Yeah,
[3:08:28]
>> Gary. I think it's also helpful that the
[3:08:30]
50 feet is limited to three stories.
[3:08:33]
That's that's helpful.
[3:08:34]
>> Yeah, that's a great point, Bill.
[3:08:37]
>> So, where's the bottom trail from here?
[3:08:39]
Finish that out right there.
[3:08:40]
>> That's a great question, Becky. Let's
[3:08:42]
jump to uh let's jump to that. That's
[3:08:45]
kind of buried uh deep in the slide here
[3:08:47]
in the slide deck. No, it's not.
[3:08:51]
Okay. So, in this area, in this general
[3:08:56]
area right here is kind of the ridge
[3:08:57]
line that comes down from KF Peak. Um,
[3:09:00]
and so the Bonavville Shoreline Trail up
[3:09:03]
south of the site comes right here and
[3:09:04]
then it it ducks over and goes down and
[3:09:07]
connects all the way up to to 189.
[3:09:09]
>> Can we go back to the other because
[3:09:11]
looking at the sky view down that's why
[3:09:13]
I wanted elevations, right?
[3:09:14]
>> Oh, if we could go back to the elevation
[3:09:18]
on the other one that you just had.
[3:09:19]
>> It's not on that sheet. It would be on
[3:09:21]
the other side of the ridge. You
[3:09:22]
couldn't see it from that location.
[3:09:24]
>> So, it's not even where you can see it.
[3:09:26]
>> Not even visible. No, it's not even
[3:09:28]
visible on the
[3:09:30]
>> Is there going to be any trail system
[3:09:31]
that's going to be on this?
[3:09:32]
>> Absolutely. Yeah, we have that in the
[3:09:34]
development agreement. We have
[3:09:35]
significant amounts of of restoration
[3:09:37]
and trails that we're talking about
[3:09:39]
doing. So, this this maybe is the heart
[3:09:42]
of the conversation and we'll get into
[3:09:43]
the specifics of this with the council,
[3:09:45]
but um the administration the mayor and
[3:09:48]
the administration really kind of beat
[3:09:49]
us up in terms of kind of negotiating
[3:09:52]
the terms of the purchase and sales
[3:09:54]
agreement. And part of that was she
[3:09:56]
said, "Look, I'm going to try to get um
[3:09:59]
as much as I can from the developer in
[3:10:01]
this in this in this process, but then
[3:10:03]
really it's a city council." I think she
[3:10:05]
heard the the the conversation loud and
[3:10:07]
clear. I don't want to speak for you,
[3:10:08]
mayor, but it's like um Becky, I think
[3:10:10]
it was you that focused on it. Maybe
[3:10:12]
Jeff, I I can't remember all the folks,
[3:10:14]
but in previous meetings, it's been
[3:10:15]
something that it's like, hey, look, the
[3:10:16]
council needs to have a vote and a say
[3:10:18]
in this purchase agreement and how that
[3:10:20]
works. And so, right now, again, our
[3:10:23]
proposal is that we would be acquiring
[3:10:26]
66 acres from the city in order for all
[3:10:28]
of this to work. And as part of that
[3:10:29]
commitment, we would be putting anything
[3:10:32]
outside of the the footprint of Vesper
[3:10:34]
into a conservation easement, a deed
[3:10:36]
restricted conservation easement, which
[3:10:38]
is like a double layer of protection. So
[3:10:40]
that's currently in the development
[3:10:41]
agreement right now. And the way that would work is this is probably a
[3:10:45]
good exhibit to kind of explain this. We
[3:10:48]
would not be um so this is this is the
[3:10:51]
city property in blue there. That's the
[3:10:53]
property there on the upper side of the
[3:10:55]
page. And then this is the property that
[3:10:56]
we will be that we will be acquiring.
[3:10:58]
The light blue then is the footprint of
[3:11:00]
where Vesper sits. And so anything that
[3:11:03]
you can see there and then the red
[3:11:05]
outline shows the existing disturbance
[3:11:07]
that has happened in the area over the
[3:11:09]
previous generations or decades or
[3:11:10]
whatever. And so all of Vesper fit fits
[3:11:13]
within that footprint. And then any of
[3:11:15]
this additional property that we will we
[3:11:17]
will be purchasing from Provo but not
[3:11:19]
developing as part of Vesper, we would
[3:11:21]
be putting into a conservation easement.
[3:11:22]
And that's that's this exhibit here. So
[3:11:25]
our commitment in the development
[3:11:26]
agreement is that up to 50% of the
[3:11:29]
property that we would be purchasing
[3:11:30]
from Provo City. So of that 66 acres we
[3:11:34]
would be putting and this is the math
[3:11:36]
right here. Um
[3:11:41]
sorry I'm getting all jumbled around. Uh
[3:11:44]
it's right here.
[3:11:48]
Oh my gosh. I'm sorry. Here we go. Okay.
[3:11:52]
So of the 66.47 47 acres that we would
[3:11:56]
be acquiring from Provo City. 39.99
[3:11:59]
acres of it um would be we would
[3:12:02]
transfer 39.99 acres in terms of this
[3:12:05]
property here which is up Provo Canyon
[3:12:07]
up near Vivian Park. We would transfer
[3:12:09]
that as as a trade for the property and
[3:12:12]
we would put all of that into a
[3:12:13]
conservation easement. And then of the
[3:12:16]
site that we would be acquiring the 66
[3:12:17]
acres, we would we would voluntarily be
[3:12:19]
putting 33 acres of that back into a
[3:12:22]
conservation easement. So, as you look
[3:12:24]
at this 39 acres plus the 33 acres of
[3:12:27]
the Vesper site, that gets you to the
[3:12:29]
73.22 acres. So, there's a net increase
[3:12:32]
in city ownership or active conservation
[3:12:35]
of 6.75 acres. So, it's a net increase.
[3:12:38]
>> What exactly? Do you have a map that
[3:12:40]
shows what exactly would be in a
[3:12:42]
conservation easement?
[3:12:43]
>> Uh, no. Right now, our commitment is 50%
[3:12:46]
of the site that we're acquiring from.
[3:12:48]
You don't have the specifics on how much
[3:12:52]
you're going to utilize and how much is
[3:12:53]
going to go back into it?
[3:12:55]
>> Well, it will be it will be a minimum of
[3:12:56]
33.23 acres, but the act exact location
[3:12:59]
we can't finalize until we've complete
[3:13:01]
the design of the project.
[3:13:03]
>> Okay. And then who is it that holds the
[3:13:06]
conservation easement? And who is it
[3:13:08]
that has so is it you with the who how
[3:13:13]
does that exactly work? Is it Provo City
[3:13:16]
that's going to be the landowner at that
[3:13:17]
point? And then we're going to have a
[3:13:18]
conservation easement with someone else.
[3:13:21]
>> Um I I think all of those things are
[3:13:22]
open. Those are all possibilities. Um I
[3:13:25]
don't know that we have the specifics
[3:13:26]
>> and then you guys pay the however much
[3:13:28]
it is the cost to put it in the
[3:13:30]
conservation.
[3:13:31]
>> Conservation. Correct.
[3:13:32]
>> I think I think that needs to be
[3:13:34]
>> stated Yeah.
[3:13:36]
>> Explicitly.
[3:13:36]
>> Yeah. Because it's pretty vague.
[3:13:38]
>> We've tried to be as clear as we can.
[3:13:40]
These are all good points. So I think
[3:13:42]
making sure it's clear who the
[3:13:43]
conservation easement is with is an
[3:13:45]
important consideration. And then um
[3:13:47]
>> who holds the easement and then who
[3:13:49]
holds the property, right?
[3:13:50]
>> And then who holds the property
[3:13:51]
>> and who's going to pay for that? Because
[3:13:54]
what was it, Marcia? What how much did
[3:13:56]
we pay for this Lake Canyon when was it?
[3:13:58]
Well, it wasn't as they raised 10,000.
[3:14:00]
>> Was it 10,000? Yeah.
[3:14:02]
>> Yeah. I mean, somebody
[3:14:05]
can comment on
[3:14:08]
>> Yeah. Slate Canyon Conservation Nation
[3:14:10]
is unique because it's city- owned
[3:14:12]
property and so we're going through a
[3:14:14]
city a public benefit process. Whereas
[3:14:17]
this, if it was owned by a private
[3:14:19]
entity, it enters into a different
[3:14:21]
process wherein the land owner would
[3:14:23]
have to pay or someone else would have
[3:14:25]
to put the cost to put that part of the
[3:14:27]
parcel into the easement and pay for
[3:14:29]
those development rights. And then the
[3:14:31]
easement would have to be held by a
[3:14:33]
third party. So, whoever the land owner
[3:14:35]
is would have to figure that out, figure
[3:14:38]
out the cost of what the land would be,
[3:14:40]
appraise it, and then pay for the
[3:14:41]
easement. So, I don't know if the city
[3:14:45]
would be a partner in that if they're
[3:14:47]
the land owner. We wouldn't I don't that
[3:14:50]
would all have to be details figured
[3:14:52]
out. We wouldn't be the land owner if
[3:14:54]
they bought it, but then they would have
[3:14:55]
to be the ones responsible to go through
[3:14:58]
the whole process of putting it back.
[3:15:00]
Then they would set the terms of the
[3:15:01]
ement with whoever then was holding the
[3:15:03]
ement
[3:15:04]
>> well
[3:15:05]
>> and agree on the cost of the
[3:15:07]
>> well and then it would be is it public
[3:15:08]
benefit if you guys put in a
[3:15:10]
conservation ement right people couldn't
[3:15:12]
necessarily hike on it if that's so I
[3:15:15]
think I think those are terms that we
[3:15:16]
need
[3:15:16]
>> they need to be clarified
[3:15:18]
>> yeah our intent Becky is that we want
[3:15:20]
Vesper to be a really important trail
[3:15:22]
head for everything that the forest
[3:15:24]
service is doing south and I guess all the way around the property. So from
[3:15:29]
our perspective right now, the gun range
[3:15:31]
significantly limits the ability to
[3:15:33]
provide hiking and opportunities up in
[3:15:35]
there. And so all of these changes would
[3:15:37]
be changes that would have to be worked
[3:15:38]
together. And and we want to be a trail
[3:15:41]
head for people to access all of those
[3:15:43]
trails.
[3:15:43]
>> But it's a private trail head race.
[3:15:45]
>> It's it's it would be it would be a
[3:15:46]
private trail head that would have
[3:15:48]
conservation easements and deed
[3:15:50]
restrictions on them. And we would want
[3:15:51]
the public to use them. Absolutely.
[3:15:53]
>> Well, that I think that needs to be a
[3:15:55]
part of the specifics in the development
[3:15:57]
agreement. We feel like it is, but if it
[3:15:59]
needs to be clarified,
[3:16:00]
>> I think it needs to be clear.
[3:16:03]
>> Yeah.
[3:16:05]
>> Those are all things that we can add
[3:16:07]
clarifications to.
[3:16:11]
» Jeff, councelor Whitlock.
[3:16:12]
>> Yeah, I just uh had a couple questions
[3:16:14]
here. So, yeah, I appreciate seeing this
[3:16:17]
overview slide of the economic develop
[3:16:19]
economic impact.
[3:16:21]
>> Um, I haven't had a chance to go on the
[3:16:23]
numbers of the most recent materials you
[3:16:24]
send.
[3:16:24]
>> Yeah. But I'm wondering, do you know or
[3:16:27]
have any idea yet about how many
[3:16:28]
household uh carrying incomes this uh
[3:16:32]
project would offer?
[3:16:33]
>> There was an estimate um there was an
[3:16:35]
estimate in there based on a quick
[3:16:38]
analysis that they looked at to say of
[3:16:39]
those living in Provo, how many of how
[3:16:41]
many of those residents work in Provo?
[3:16:43]
>> No, I'm more asking like I imagine it's
[3:16:45]
a lot of part-time jobs. I'm talking
[3:16:46]
about like full-time salary jobs paying
[3:16:48]
a livable wage for Provo.
[3:16:49]
>> Correct. And they make an assumption
[3:16:51]
there of what that number is. Yeah.
[3:16:52]
>> Okay. Okay. Do you know that number off
[3:16:54]
the top of your head?
[3:16:54]
>> I I want to say it's uh it's like two
[3:16:57]
200, but I don't know that for a fact. I
[3:16:59]
think it was like 24% of the total
[3:17:01]
employee uh employ uh jobs that are
[3:17:04]
created of the 900 and whatever that
[3:17:06]
number is. Let me just pull it up again
[3:17:08]
really quickly. It's I think 957
[3:17:10]
jobs.
[3:17:11]
>> Yeah, 957 jobs.
[3:17:12]
>> Um I think I think about 20 to 24% of
[3:17:14]
those are full-time local jobs. And then
[3:17:19]
so I you you said that on the rendering
[3:17:22]
you showed 14 acres it's on on ground
[3:17:25]
parking
[3:17:26]
>> correct.
[3:17:26]
>> Do you know how many stalls that is?
[3:17:28]
>> Yes.
[3:17:30]
>> Um
[3:17:32]
is there a way for us to just take a
[3:17:34]
step back and focus on traffic and
[3:17:36]
parking kind of together?
[3:17:37]
>> Sure.
[3:17:37]
>> I think if we could if we could do that
[3:17:39]
and then come back to to your question
[3:17:41]
um Commissioner Wlock or Council Member
[3:17:43]
Wlock, I think that would be maybe a
[3:17:45]
good way to approach it. Um there's a
[3:17:47]
lot of questions on traffic and parking.
[3:17:50]
Um so I think I think from my
[3:17:51]
perspective I' I'd like to be able to do
[3:17:53]
that. So if that's okay. Um I think the
[3:17:56]
assessment that's really important to
[3:17:58]
analyze is just how does the traffic get
[3:18:02]
to Vesper? Um shoot.
[3:18:06]
Uh I thought it would show up the slide
[3:18:07]
that I was on. Let me see if I can get
[3:18:09]
that to show up. Okay. So the the
[3:18:12]
question becomes um it looks like Rachel
[3:18:14]
has has a question. Rachel, if uh if we
[3:18:16]
can if we can talk about traffic and
[3:18:18]
parking um and then maybe if if that
[3:18:20]
addresses your question, would that be
[3:18:22]
okay? Or did you want to did you want to
[3:18:23]
chime in right now?
[3:18:27]
» That's fine. You can go ahead. I'm
[3:18:29]
writing down my questions so I won't
[3:18:30]
lose them.
[3:18:31]
>> Okay, perfect. Great.
[3:18:33]
>> Okay. And how much time do we have? When are you guys out of here? What?
[3:18:37]
>> So, let's target uh 4 for the
[3:18:40]
presentation.
[3:18:40]
>> Okay.
[3:18:41]
>> But then technically we can go till
[3:18:42]
4:30.
[3:18:43]
>> Okay. Uh another item was continued.
[3:18:46]
Okay.
[3:18:46]
>> So more interaction with um you close
[3:18:50]
meeting
[3:18:51]
>> at 4:30, right?
[3:18:52]
>> At 4.
[3:18:53]
>> How how long has that been?
[3:18:55]
>> Yes, we have. It's
[3:18:58]
[snorts]
[3:18:59]
>> So I think we can do that from 4:30 to 5:20.
[3:19:04]
Maybe. Let's do four. Let's do 420
[3:19:07]
>> because we we can eat during the um
[3:19:10]
during the close session.
[3:19:13]
Okay, thank you. So, we have till 4
[3:19:15]
o'clock. So, to present
[3:19:17]
>> Okay, we'll we'll get through traffic in
[3:19:19]
probably 5 to 10 minutes. Um, the way
[3:19:21]
that this works is we've got 10% right
[3:19:24]
now. Um, our traffic engineering and and
[3:19:27]
the analysis that's been done is we've
[3:19:28]
gone and looked at several different
[3:19:29]
events to say what is the range of
[3:19:31]
traffic that's coming from Provo Orum
[3:19:34]
versus coming from Heaper. And right now
[3:19:36]
we can show we could justify in the
[3:19:38]
traffic analysis as high as 35% coming
[3:19:42]
from Heber kind of that side because if
[3:19:44]
you could imagine if you're up in Davis
[3:19:45]
County um or somewhere near I80 and
[3:19:48]
you're like hey I'm looking at traveling
[3:19:49]
south to Vesper on a Friday afternoon at
[3:19:52]
4:30 5:00 it's going to be very very
[3:19:55]
challenging very difficult lots of
[3:19:57]
traffic. So it it a lot of that a lot of
[3:19:59]
times that traffic can take you up over
[3:20:01]
parleys. When I'm coming down from Davis
[3:20:03]
County, that's where it takes me a lot
[3:20:04]
of times uh to get down into Provo. Um
[3:20:06]
so we could we could see this number
[3:20:08]
going significantly higher than the 10%
[3:20:10]
that's currently being proposed right
[3:20:12]
now. But that's the number that we feel
[3:20:13]
like is conservative and it would only
[3:20:15]
get better um from there. Then 90% the
[3:20:18]
other 90% would come then from ORM and
[3:20:20]
Provo. And that traffic is likewise
[3:20:23]
split with a 45 universe 45% traffic
[3:20:26]
coming up university and a 55% coming up
[3:20:29]
8th north. So that's kind of the way
[3:20:31]
that the traffic arrives at the site
[3:20:33]
right now. Um I think it it it needs to
[3:20:36]
be talked about um that right now we
[3:20:39]
have 3.5 people 3.5 people per vehicle
[3:20:44]
showing up at the site. Um and so that's
[3:20:46]
the assumption that UD do has agreed to.
[3:20:48]
Um, that's the number that we're that
[3:20:50]
we're coming that we're coming that
[3:20:51]
we're kind of finalizing as the parking
[3:20:53]
stalls that are necessary. And that
[3:20:55]
number, again, we're kind of in in in
[3:20:57]
current um review of those numbers and trying to figure out all these
[3:21:01]
specifics right now. Um, but if you take
[3:21:03]
the 20,000 and you divide that by the
[3:21:05]
3.5, that gets you to 5,700 stalls. So,
[3:21:09]
we're we're looking to be somewhere
[3:21:11]
between 4,500 stalls right now and 5,700
[3:21:15]
stalls. Right now, Provo City's
[3:21:18]
ordinances suggest that we would need
[3:21:20]
about 5,100 stalls. So, that's kind of
[3:21:22]
the number that we're looking at is
[3:21:24]
somewhere in that range. And so, as you
[3:21:26]
look at that, when you look at any event
[3:21:29]
of of this type of magnitude, this data
[3:21:31]
comes specifically from USANA. So, this
[3:21:34]
data that we're getting in terms of when
[3:21:36]
people arrive at an event, this comes
[3:21:37]
from USANA. So, right now, we've got
[3:21:40]
three hours before the event, you've got
[3:21:41]
6% of the population that shows up. um
[3:21:44]
two hours before the event you've got an
[3:21:46]
additional 12% 25% shows up an hour
[3:21:49]
before and then um that that you know
[3:21:52]
this is the hour before the event start
[3:21:54]
is 38%. And so right now uh and then
[3:21:57]
again some additional traffic that comes
[3:21:58]
in to the site after after the event
[3:22:01]
starts because people are running late
[3:22:02]
or they don't want to deal with the
[3:22:04]
traffic. Um, so then what we did is we
[3:22:06]
analyzed this and said, "Okay, of this
[3:22:08]
traffic that's arriving at the site, the the most critical part of it is is a
[3:22:13]
maximum capacity event." So all winter
[3:22:16]
long, our events are much much smaller.
[3:22:18]
A maximum capacity event in the winter
[3:22:20]
is 8,000 people. We can't fit any more
[3:22:22]
than 8,000. We're not really even
[3:22:24]
analyzing that because those traffic
[3:22:25]
impacts are going to be negligible. They
[3:22:27]
really will not be very significant for
[3:22:29]
an 8,000 person event. um as you start
[3:22:31]
getting into the 14, you know, 18 20,000
[3:22:34]
person events, that's where this number
[3:22:36]
starts to come in. And so this is the
[3:22:38]
split in terms of the specific traffic.
[3:22:41]
We we haven't looked at the specific
[3:22:42]
traffic. What we did is we kind of
[3:22:43]
equated these numbers to what is the
[3:22:45]
impact in terms of time. So if you're
[3:22:47]
getting off of 8th North on I-15, what
[3:22:50]
is the impact in time to get to the
[3:22:52]
mouth of the canyon? And then it's the
[3:22:53]
same way as you're getting off of
[3:22:55]
another one of the cross streets,
[3:22:56]
whether it's Center Street in Orum or
[3:22:58]
University Avenue, getting up to
[3:23:00]
University Parkway to come up to the
[3:23:02]
site. Um those are the delays that we've
[3:23:04]
looked at and we're still finalizing
[3:23:06]
this as late as last night. This um the the traffic the way that it works
[3:23:11]
right now is if you're getting off of
[3:23:13]
I-15 to get to the mouth of the canyon,
[3:23:15]
that delay right now uh without any
[3:23:17]
delays is about 5 to 6 minutes. And then
[3:23:20]
if you add the PM peak hour, so you're
[3:23:22]
talking about the traffic, that delay
[3:23:24]
takes about eight minutes to get to the
[3:23:26]
mouth of the canyon. So the impacts that
[3:23:28]
we would be talking about putting on
[3:23:29]
these roads in the event of a maximum
[3:23:32]
capacity event in the PM peak of 1100
[3:23:34]
vehicles that equates that 38% equates
[3:23:37]
to,00 vehicles on 8th North. That is
[3:23:39]
that equates to an 8m minute delay on
[3:23:41]
8th North in addition to the PMP the
[3:23:44]
normal PMP traffic that would be there.
[3:23:46]
So that's the event that's that's the
[3:23:48]
impact that we're talking about on these
[3:23:50]
roads. And then it's a similar type
[3:23:52]
analysis that we've talked about on
[3:23:53]
university. So if you take again a
[3:23:55]
similar distribution, you take that last
[3:23:57]
38% that shows up the hour before the
[3:23:59]
event, the traffic on university would
[3:24:01]
be about 1,400 vehicles and that delay
[3:24:04]
would be an additional about 8 to 10
[3:24:06]
minutes of delay on that site. And we're
[3:24:08]
still refining the specifics of those
[3:24:10]
numbers, but those that's the data. So,
[3:24:12]
as you arrive to the site, we're talking
[3:24:14]
about an additional 8 to 10 minute
[3:24:15]
delay. And then when we're leaving the
[3:24:18]
site, it's um it's similar about 18 uh
[3:24:21]
sorry, about about uh 8 to 10 minute
[3:24:24]
delay as you leave the site. So, where
[3:24:26]
that kicks in or where that picks up is
[3:24:28]
if you're coming down um from Heber and
[3:24:30]
you're on 189 coming into Provo, um as
[3:24:33]
soon as you get on Vesper, that that
[3:24:35]
traffic would slow down significantly.
[3:24:37]
And so, that's that that slow in
[3:24:39]
traffic. We're averaging 5 to 10 miles
[3:24:41]
per hour and that would equate to about
[3:24:43]
a 10-minute delay to get down to the
[3:24:44]
mouth of the canyon because then once
[3:24:46]
you're at the mouth of the canyon as you
[3:24:47]
take a right that traffic widens up to
[3:24:49]
three lanes um or on university it
[3:24:51]
widens up to two to three lanes uh very
[3:24:53]
quickly. So that's those are the delays
[3:24:55]
that we're talking about in terms of the
[3:24:57]
overall traffic impacts um um for
[3:24:59]
Vesper.
[3:25:00]
>> Has seen your numbers?
[3:25:02]
>> What's that?
[3:25:02]
>> Has Vern and UD do seen your numbers?
[3:25:04]
>> Um yeah. Well, I think we're in the
[3:25:07]
process of reviewing those numbers with
[3:25:08]
Vern right now, but I'll I'll let Vern
[3:25:09]
speak for himself.
[3:25:13]
>> Question about this picture first.
[3:25:15]
>> Do you want a picture?
[3:25:18]
>> Like it says 43% arrived two to three
[3:25:20]
hours prior to the event. Where are you
[3:25:22]
getting%?
[3:25:24]
>> That that 43% Krice is just you add six
[3:25:27]
plus 12 plus 25. So when you add all
[3:25:30]
three of those numbers together, that's
[3:25:32]
the 43%. And then that last hour before
[3:25:35]
the event, you're talking about 30% 38%
[3:25:38]
shows up at that at that last event. And
[3:25:40]
maybe um if I'm if I'm sorry, Katrice,
[3:25:44]
does that answer your question?
[3:25:46]
>> Well, it should say arrive one to three
[3:25:48]
hours prior to the event, not two to
[3:25:50]
three hours prior to the event.
[3:25:51]
>> Yeah. Yeah, that's true. So, one to one
[3:25:54]
to three hours before the event is 43%.
[3:25:56]
That's a great that's a great catch. And
[3:25:57]
m maybe Vern, if I if I might, can I
[3:26:00]
just talk specifically about So, we've
[3:26:03]
kind of talked about 8th North and
[3:26:04]
Becky, it's a very valid question. We've
[3:26:06]
got to have Vern weigh in. He's he's got
[3:26:08]
to be okay with these numbers. So, we'd
[3:26:09]
love to get I'd love to get his opinion
[3:26:11]
and perspective on this. Maybe before we
[3:26:13]
do that, if we could just talk about
[3:26:14]
this slide right here. This is another
[3:26:17]
really important slide that I think goes
[3:26:18]
into the traffic question and really
[3:26:20]
addresses uh our attempt was to address
[3:26:23]
those concerns. So, if you're looking at
[3:26:25]
the site right now, one of the most
[3:26:27]
important things as as you're getting
[3:26:28]
traffic up to the site is getting them
[3:26:30]
safely off of 189. And so, this this has
[3:26:33]
been reviewed with UD do, it's not
[3:26:35]
approved because until we get our final
[3:26:36]
approvals in a year from now, it won't
[3:26:38]
be finalized. But, UD do has weighed in
[3:26:40]
on this and they've said um they they
[3:26:42]
like this uh they like our perspective
[3:26:44]
in the direction that we're headed. Um
[3:26:46]
so, the way that it works is you come in
[3:26:48]
off of 189. Wow, that's really cool.
[3:26:51]
Okay. All right. I don't know how to
[3:26:53]
undo that, but
[3:26:54]
>> Okay. All right.
[3:26:55]
>> You're free to use it as much as you
[3:26:56]
>> Okay, cool. I'll be careful not to touch
[3:26:58]
it. So, you've got two lanes of traffic
[3:27:00]
coming in. And this this length right
[3:27:02]
here is over 1,000 ft. It's the entire
[3:27:04]
frontage of Esper. And that would be pulling off of of 189 to
[3:27:09]
have all of that stacking capacity there
[3:27:11]
as you arrive to the site. And then we'd
[3:27:13]
come in, we would go to the roundabout.
[3:27:15]
and then
[3:27:17]
this this additional portion right here.
[3:27:19]
And if you want to just erase that, that
[3:27:21]
would be awesome. But all of that
[3:27:22]
portion right there, that would be an
[3:27:24]
addition that would widen to additional
[3:27:25]
four lanes. And so that allows traffic
[3:27:28]
to um from a couple of different
[3:27:30]
perspectives to come into the site
[3:27:32]
effectively and efficiently. So number
[3:27:33]
one is coming off 189 from Po and Oram.
[3:27:36]
It would also pick up this traffic as
[3:27:37]
you're coming in from Heber. This is the
[3:27:39]
off-ramp and you'd come across that that lane of traffic. You'd have two
[3:27:42]
lanes of traffic like we talked about
[3:27:44]
earlier. And then we would allow that
[3:27:45]
traffic to merge here. And then this
[3:27:47]
traffic would continue to merge here.
[3:27:49]
And that traffic would allow continue to
[3:27:50]
allow to to go up to here like like uh
[3:27:53]
commissioner or council member um Bogdan
[3:27:55]
was asking about. That would allow
[3:27:56]
traffic to come up here or parking
[3:27:58]
excuse me parking to come up here and
[3:28:00]
then parking to come this way and load
[3:28:01]
all of these uh surface sites as well.
[3:28:04]
This is a really important design. This
[3:28:06]
is not a small thing on the parking
[3:28:08]
structure. So we've talked about the
[3:28:09]
surface parking and then the parking
[3:28:11]
structure loading into the parking
[3:28:13]
structure. It's a speed ramp. It's
[3:28:15]
called a speed ramp. It is like the
[3:28:16]
opposite of what Salt Lake City airport
[3:28:20]
has. That is the most inefficient design
[3:28:22]
ever. And so this speed ramp, you're
[3:28:25]
able to come up the side of the parking
[3:28:26]
structure and you're able to load into
[3:28:28]
each level and it's very, very
[3:28:30]
efficient. So you're pulling that
[3:28:31]
traffic off of the oncoming stream and
[3:28:34]
you're able to get people in and get
[3:28:35]
them parked safely and efficiently. So
[3:28:37]
that's an important component as we talk
[3:28:39]
about parking, getting people off of UD
[3:28:41]
do. Um we've obviously we've sorry
[3:28:43]
getting people off 189 and U dot roads.
[3:28:46]
Um we've talked about getting rid of
[3:28:47]
these left turns which again are very
[3:28:49]
important to U do um that's that's an
[3:28:51]
important consideration that's arriving
[3:28:54]
to the site and then departing from the
[3:28:56]
site. It's the same thing. So this is a
[3:28:58]
very efficient unloading. All of this
[3:29:00]
comes to this uh location right here. So
[3:29:03]
all of that traffic is going to be
[3:29:04]
loading on to 189 in two lanes and that
[3:29:07]
becomes the effective governor. Um we uh
[3:29:10]
the governor for for getting traffic
[3:29:12]
back onto 189. So you can't just slam
[3:29:14]
the roads because you can only offload
[3:29:16]
at two people per two, you know, two pe
[3:29:18]
two people at a time, those two lanes.
[3:29:20]
>> Um
[3:29:21]
>> Brian, you calculated how many cars can
[3:29:23]
be stacked in 1,000 feet, for example.
[3:29:25]
>> We did. We did. So all of this, Gary, if
[3:29:27]
you look at all the stacking as you add
[3:29:28]
up all of this, and again, every bit of
[3:29:30]
stacking that we're giving up is giving
[3:29:32]
up parking. So, we've that's a big
[3:29:34]
concession that we've tried to figure
[3:29:35]
out how to balance that because we
[3:29:37]
wanted to make sure we can get people
[3:29:38]
off of 189 safely. And that number down
[3:29:41]
here is 1,00 vehicles. So, as you look
[3:29:43]
at the 10,000 vehicles, that allows for
[3:29:45]
all this stacking to take place. So
[3:29:47]
again, if we're talking about 4,500
[3:29:49]
vehicles to 5,500 vehicles of total
[3:29:52]
parking on site, that's a 20% amount,
[3:29:55]
you know, to 20% of that can be stacked
[3:29:57]
on the site, which again is we feel like
[3:30:00]
we're very confident. Our Horox
[3:30:02]
engineering, our traffic engineer, and
[3:30:04]
UD do is feeling good that this this
[3:30:06]
does really uh allow traffic to get off
[3:30:08]
safely off of 189 and make sure they
[3:30:10]
continue to do that.
[3:30:11]
>> Heard that at peak hours that that
[3:30:14]
traffic backs up the canyon to these parks because there's already a
[3:30:20]
congestion problem. How does that work
[3:30:22]
with adding all these trying to get back
[3:30:24]
on when it's backed up?
[3:30:26]
>> So, I I think if I'm understanding your
[3:30:28]
question, um, Commission, Council Member
[3:30:30]
Bogdan, it's it's just this this portion
[3:30:32]
of the of of I or 189 gets backed up.
[3:30:36]
>> So, we'll obviously be offloading at,
[3:30:39]
you know, 10:30, 11, 11:30 at night. So,
[3:30:42]
the the traffic volumes go significantly
[3:30:44]
down. we won't be unloading it at the
[3:30:45]
pem peak. So that that resolves a a big
[3:30:49]
portion of the concern. But um Becky
[3:30:54]
ultimately I guess let's just jump to
[3:30:56]
this because this is kind of maybe the the icing on the cake or kind of the final talking point and that is what
[3:31:02]
are the improvements that are necessary
[3:31:04]
in this area and um well I'll just talk
[3:31:09]
about them because I'm not seeing my
[3:31:11]
slide right here. Dang it. Oh, it's
[3:31:14]
right here.
[3:31:16]
Okay. So, [snorts] Becky, um, this is
[3:31:19]
the improvements that need to be made.
[3:31:21]
You do DOT
[3:31:23]
will recognize that right now this
[3:31:25]
intersection and certain movements of
[3:31:27]
this intersection are problematic. So,
[3:31:29]
the the movement that you've talked
[3:31:30]
about, Becky, is this right-hand turn on
[3:31:32]
the 189 or on the 8th North is the most
[3:31:35]
problematic movement of the inter
[3:31:36]
intersection. and they would uh they
[3:31:39]
would admit that that's a problem today
[3:31:42]
um at PM Peak and it's only going to
[3:31:43]
become a worse problem as Heber
[3:31:45]
continues to grow and do what they're
[3:31:46]
doing and that you know the commuter
[3:31:48]
continues to increase and so
[3:31:49]
improvements need to be made there and
[3:31:51]
one of the suggest one of the
[3:31:53]
suggestions that we're making to UD do
[3:31:54]
as part of the overall improvements that
[3:31:56]
need to be made is that this become this
[3:31:58]
right uh this yellow lane become a
[3:32:00]
continuous flow which would really allow
[3:32:02]
that whole that whole system to flush
[3:32:04]
out and the traffic can get get where it
[3:32:07]
needs to go. So, that's right now the
[3:32:09]
solution that we're proposing to UD do
[3:32:11]
in hopes that that will again it will
[3:32:14]
take care of the problem. Um, it's just
[3:32:16]
working those details out with UD do to
[3:32:18]
make sure we can get that worked out.
[3:32:19]
The bridge widening has to be done as
[3:32:21]
well and that road has to be widened all
[3:32:23]
the way up for those those that traffic
[3:32:24]
to continue to merge and and get going.
[3:32:26]
>> And UD do recognizes that and is willing
[3:32:28]
to I've had some say that that needs to
[3:32:31]
happen with or without Vesper, that
[3:32:33]
dedicated lane.
[3:32:34]
>> Yeah, it needs to happen right now. that that movement is not is not it's not in failure level of service but
[3:32:42]
it's it's you know in PMP it it's a
[3:32:45]
problem. So um there's one more thing
[3:32:48]
before I before I let two more minutes
[3:32:50]
on this on this issue right here. Um
[3:32:53]
there's a lot of things that we're
[3:32:55]
implementing in terms of traffic
[3:32:56]
measures that for our maximum capacity
[3:33:00]
events we I wanted to mention really
[3:33:02]
quickly before we before I I let Vern
[3:33:04]
chime in and and share his perspective
[3:33:07]
on these numbers. So um the maximum
[3:33:11]
capacity events are critically important
[3:33:12]
that we manage parking and traffic
[3:33:14]
incredibly closely. And so as part of
[3:33:17]
that that's what this chart is that you
[3:33:18]
see over here. Um that's really really
[3:33:21]
important. So, we talk about on-site
[3:33:23]
parking, we talk about structured
[3:33:25]
parking, we talk about surface parking.
[3:33:27]
Now, we talk about off-site parking. We
[3:33:29]
haven't talked about off-site parking.
[3:33:30]
So, that to from our perspective, that
[3:33:33]
really does allow us still to get to
[3:33:34]
that, you know, six 7,000 stalls, an
[3:33:37]
appropriate number of stalls is that we
[3:33:39]
would have three or four locations
[3:33:40]
offsite and then we would have a shuttle
[3:33:43]
system that would allow um people our guests to come to Vesper in the
[3:33:47]
shuttle. And so that really it's it's a
[3:33:49]
very common practice for a lot of other
[3:33:50]
venues across the country. And so that
[3:33:52]
allows us the flexibility to not need
[3:33:54]
the traffic or the parking on site, but
[3:33:56]
to get go secure those spots and then
[3:33:58]
bring and then bring um bring our guests
[3:34:00]
to uh to to Vesper. Um that includes the
[3:34:04]
shuttle service. So um that shuttle
[3:34:07]
service, we're also talking about
[3:34:08]
implementing that shuttle service down
[3:34:09]
to one of the Front Runner stops. Um,
[3:34:12]
we're hoping that we could uh make that
[3:34:14]
work on at the Vineyard Station, the the
[3:34:15]
station in Orum or even the the one in
[3:34:17]
Provo. Likely the one uh at Vineyard
[3:34:20]
Station would be probably the most
[3:34:21]
convenient for people to get to. Um, but
[3:34:23]
that's one of the other um one of the
[3:34:25]
other uh shuttle services that we're
[3:34:27]
talking about um is is is that um
[3:34:30]
carpooling will be a requirement. Um if
[3:34:32]
any of you have gone up to the mountains
[3:34:34]
skiing, um it's a requirement. If you
[3:34:36]
don't have four people in your vehicle,
[3:34:37]
you're paying a lot more per per vehicle
[3:34:39]
to park there. And so those are all
[3:34:41]
incentives that we would be giving for
[3:34:43]
people to carpool. We do not want one
[3:34:45]
person showing up to the site. And if
[3:34:46]
that's going to be your approach, you're
[3:34:48]
going to pay heavily in terms of parking
[3:34:49]
for that to happen. Um ride share. We've
[3:34:52]
got to accommodate all the ride share.
[3:34:54]
We've talked about having an off-site
[3:34:55]
ride share where they would be dropped
[3:34:57]
off at one of our one of our lot one of
[3:34:59]
our lots so that we would avoid that
[3:35:01]
traffic. Sorry, coming up um 189 and
[3:35:04]
getting to the site. Um there's still a
[3:35:06]
lot that needs to be done with ride
[3:35:07]
share, but right now we can accommodate
[3:35:08]
the ride share and the shuttle service
[3:35:10]
um as we've got it planned right now. Um
[3:35:13]
FrontrRunner regional transit, we talked
[3:35:14]
about that. Uh the pedestrian and
[3:35:16]
bicycle access is not something that
[3:35:18]
we're saying is a massive part of the
[3:35:20]
project, although we will have a
[3:35:22]
significant amount of bike parking um on
[3:35:24]
site because uh I
[3:35:27]
>> mean significant amount. What does that
[3:35:29]
translate to in numbers? Um, whatever
[3:35:31]
people are willing to drive here on a
[3:35:33]
bike, we are ecstatic about it and we
[3:35:35]
will provide a place for them to park so
[3:35:36]
that they get their car off the road.
[3:35:38]
So, that's a huge win for us. I think
[3:35:40]
it's a win for everybody. All of us from
[3:35:42]
a traffic perspective. So, we will
[3:35:44]
provide parking, secure parking or
[3:35:45]
people won't feel safe leaving their
[3:35:47]
bike and it won't work.
[3:35:48]
>> That mean there'll be like a bike path
[3:35:51]
on the bridge.
[3:35:52]
>> 100%. Yeah, Jeff.
[3:35:53]
>> On the overpass?
[3:35:54]
>> Yes. So, as you come up Pro River, the
[3:35:56]
Pro River crossing, there would
[3:35:57]
absolutely be that pedestrian and bike
[3:35:59]
path. That would be a combined
[3:36:00]
pedestrian bike and we can see that
[3:36:02]
being used extensively to get people
[3:36:04]
there.
[3:36:04]
>> Separated from the vehicles.
[3:36:06]
Yeah.
[3:36:07]
>> And you have bike lockers. Is that what
[3:36:09]
I'm hearing?
[3:36:10]
>> We will have we will have places for
[3:36:11]
people to secure their bikes. Correct.
[3:36:14]
>> As somebody who rode her bike to like
[3:36:16]
BYU football games just to avoid the
[3:36:18]
traffic. I would 100% ride my bike to a
[3:36:21]
concert here.
[3:36:24]
We think that you might be the
[3:36:25]
exception, Rachel, but there's enough
[3:36:28]
people that we have to make sure because
[3:36:30]
again, it's a benefit to Vesper to get
[3:36:33]
people riding their bikes up here. I I
[3:36:35]
see that being hard at 11 at night where
[3:36:37]
it's dark, but I think people will do
[3:36:39]
it. I think people will do it. You got
[3:36:40]
the Murdoch Canal um that comes through
[3:36:43]
here. That's a great way for, you know,
[3:36:45]
everyone south and north to come up here
[3:36:47]
um get on Pearl River Trail, ride up the
[3:36:50]
canyon, and get safely across. It's we
[3:36:52]
feel like it'll be a fantastic amenity.
[3:36:54]
Something that will be used for venues
[3:36:56]
for for for the the actual events that
[3:36:58]
we're having as well as off, you know,
[3:37:00]
offvent hours. We want people to come up
[3:37:02]
and and ride the bikes.
[3:37:03]
>> Rachel, how would you like to secure
[3:37:04]
your bike when you were there?
[3:37:07]
>> Um,
[3:37:08]
a really good bike lock area. So,
[3:37:13]
BikeWalk Provo is great about helping
[3:37:15]
people install
[3:37:17]
secure things that they can lock their
[3:37:19]
bikes to. Um, covered parking is nice.
[3:37:22]
Bike lockers take up a ton of space. Um,
[3:37:26]
I don't know that that would be
[3:37:27]
necessary for this because I'm not
[3:37:29]
leaving the bike and going for, you
[3:37:31]
know, like a two week trip or something.
[3:37:33]
It would just be for the time of the
[3:37:34]
event.
[3:37:36]
And I would just see it just like I feel
[3:37:39]
safe leaving my car locked in a parking
[3:37:42]
lot. It would be similar to that.
[3:37:46]
So now Brian, bring this transportation
[3:37:48]
down to actual parking, which was Jeff's
[3:37:50]
original question. Let's get to the
[3:37:52]
parking itself.
[3:37:54]
>> Right. Right now, um Gary, if if UD do
[3:37:58]
came to us and said your maximum park,
[3:38:00]
your maximum number of vehicles that can
[3:38:03]
come over that fly over at 8th North
[3:38:05]
is,00 vehicles, that's what we think the
[3:38:07]
capacity is of that road right now. We
[3:38:09]
would make we would adjust our parking
[3:38:11]
numbers on site to make that work. So,
[3:38:15]
that's where we're at is that we can be
[3:38:17]
flexible. We think this is going to land
[3:38:18]
somewhere between 4,000 and probably
[3:38:21]
5,500.
[3:38:23]
That's kind of the parking range that
[3:38:24]
we're talking about right now. We would
[3:38:26]
like to stick we would like to stick
[3:38:28]
with what the city ordinance says right
[3:38:30]
now, which would put us at 5100. Um, but
[3:38:33]
that's the parking range that we want to
[3:38:35]
be in because any additional stall above
[3:38:37]
that is a is a massive added cost to
[3:38:40]
Vesper that we don't want to have to
[3:38:42]
incur. So, we want to park it
[3:38:44]
adequately. We do not want to overpark
[3:38:46]
it. And so, yeah, 10,000 was the cap at
[3:38:48]
one point. It's now 8,000. And so, yeah,
[3:38:52]
I think that's something that we're that
[3:38:53]
we're we're wanting to push actively
[3:38:55]
push down as aggressively as we can.
[3:38:56]
Jeff,
[3:38:57]
>> if you take if you take 5,000, let's
[3:39:00]
call it what what would be the above
[3:39:03]
ground and so above ground parking is
[3:39:05]
here and it's up on this hill too.
[3:39:06]
Correct.
[3:39:06]
>> Correct. Yeah.
[3:39:08]
>> SL.
[3:39:08]
>> So, this this is that analysis, Jeff.
[3:39:10]
So, come full circle. Maybe we'll just
[3:39:12]
finish this up before we turn the floor
[3:39:14]
over to burn. This this right here is
[3:39:17]
the 14 acre total number. But this is
[3:39:19]
the this is the single the single stalls
[3:39:22]
are right here. Or just clear.
[3:39:23]
>> I got you.
[3:39:25]
>> So the total the total parking that you
[3:39:27]
see there in orange Jeff totals 12,61
[3:39:30]
stalls. Um, we feel like if if well,
[3:39:34]
let's just leave it at that. 1261 and
[3:39:36]
then we've got the parking structure
[3:39:38]
that depending on how many stories we
[3:39:39]
make that parking structure, that
[3:39:41]
parking stall could go from 2500 stalls
[3:39:43]
to 3,800 stalls. That's the size of the
[3:39:47]
parking structure. Um, that would
[3:39:48]
adequately fit or that would
[3:39:50]
appropriately fit within this area and
[3:39:52]
we could still make the commitments that
[3:39:53]
we've made to Provo City. So, um, that's
[3:39:56]
those are the numbers. Um, and we're
[3:39:58]
hoping we're hoping if if I guess Jeff
[3:40:01]
my my sense would be we'd like to do
[3:40:03]
around 3,000 stalls in the parking
[3:40:05]
structure and then we'd like to do
[3:40:06]
another 1,200 stalls um for all of the
[3:40:09]
surface parking. So that would give us
[3:40:11]
about 3,200 stalls on site. 30 3,300
[3:40:13]
stalls and then if there were a
[3:40:15]
situation or circumstance that we needed
[3:40:17]
to expand the the the parking
[3:40:19]
requirements, sorry, that would be 4200
[3:40:21]
stalls.
[3:40:22]
>> Yeah, 4200
[3:40:22]
>> I'm sorry. 4200 stalls. And then if
[3:40:24]
there would be a situation where we
[3:40:25]
needed to pick up an additional four or
[3:40:27]
500 stalls, then we would we would take
[3:40:29]
this parking lot and we would dig it
[3:40:31]
down 4 feet. We would use all of that
[3:40:33]
material to build the the kind of a
[3:40:35]
second story, but it would feel very,
[3:40:37]
you know, three or four feet above grade
[3:40:38]
because the rest would be below grade.
[3:40:40]
And we could turn all of this into a
[3:40:41]
second story, second story, and a second
[3:40:44]
story, which would then allow us to get
[3:40:46]
up to that 1950 stalls. So that would
[3:40:48]
put us at about five the 5,000 stall
[3:40:50]
number if if we had to get there. And
[3:40:52]
how many levels is the third? Like if
[3:40:54]
you do the 30,000 in this structure
[3:40:55]
parking, how many levels is that?
[3:40:57]
>> Right now, I think that number is five
[3:41:00]
to get to the 3,000. Five to six.
[3:41:02]
>> Okay,
[3:41:05]
>> Brian, just a quick question.
[3:41:07]
>> Yeah.
[3:41:08]
>> And let's say that the parking needs to
[3:41:12]
be more than five. that your assumptions
[3:41:16]
around
[3:41:18]
um you know ride sharing, all those
[3:41:20]
things just don't pan out the the way
[3:41:22]
that you hope.
[3:41:24]
>> Yeah.
[3:41:24]
>> Um where does the extra parking go?
[3:41:27]
>> The extra parking would go in the
[3:41:28]
off-site parking, Craig. Um so we would
[3:41:32]
identify right now we're actively trying
[3:41:34]
to secure 2,000 additional stalls into
[3:41:37]
in addition to everything we're doing
[3:41:38]
right here. Um and we feel like there's
[3:41:41]
adequate space. We we can't maybe share
[3:41:44]
the details of that with everybody as
[3:41:46]
much as we would like to just because
[3:41:47]
they're not finalized right now. Um but
[3:41:49]
our hope would be that before we come
[3:41:51]
back on the 25th and certainly, you
[3:41:53]
know, maybe a few weeks after that, we
[3:41:54]
hope to have those 2,000 stalls secured.
[3:41:56]
And so Craig, that's where we would pick
[3:41:58]
up those additional stalls if necessary.
[3:42:01]
>> Thank you.
[3:42:04]
>> Okay, with all of that, that's a lot to
[3:42:06]
digest. Thank you for letting me just
[3:42:08]
get it all off my chest. Um, I guess
[3:42:11]
maybe Vern, do you want would you like
[3:42:12]
to weigh in and then if there are any
[3:42:13]
other questions from the council
[3:42:14]
members?
[3:42:16]
>> That'd be great.
[3:42:19]
» Um, let me start off by saying that uh
[3:42:22]
we've had a lot of meetings with their
[3:42:24]
team and these virtual meetings have
[3:42:27]
been lengthy to say the least. Um,
[3:42:30]
they've been a long um discussions and
[3:42:34]
there have been some heartto-he heart
[3:42:35]
discussions to the point where I've
[3:42:37]
gotten animated a couple times. Okay,
[3:42:40]
just tightening up. Um, what I really
[3:42:43]
like is I like the circulation clip.
[3:42:46]
That's that's really well done. What I
[3:42:48]
also really like is the half interchange
[3:42:50]
that we're getting. We just had another
[3:42:52]
crash up there yesterday afternoon
[3:42:54]
coming downhill. Um, so I love that
[3:42:58]
we're going to see this whole five or
[3:43:01]
six accesses combined into one and
[3:43:04]
that's only going to promote more safety
[3:43:06]
along the corridor. very dangerous
[3:43:08]
corridor currently.
[3:43:10]
Those are the positives. Another
[3:43:11]
positive that I really like is the uh
[3:43:15]
parking occupancy index pricing that
[3:43:18]
they're going to do. I thought that was
[3:43:19]
very creative. Come in here, if you're
[3:43:21]
one or two, you're going to get charged
[3:43:23]
higher than your three and four or five.
[3:43:26]
I really thought that was creative. The
[3:43:28]
other thing that I like, positive stuff
[3:43:31]
that I like is it's not just one thing
[3:43:34]
of just flooding the whole thing with
[3:43:36]
parking. We got parking garage. We got
[3:43:38]
service parking. We got trails. People
[3:43:41]
can actually ride their bikes with
[3:43:43]
covered bike parking up there and feel
[3:43:46]
that they're going to come out of the
[3:43:48]
concert all happy and see their bike
[3:43:49]
there. Right. I also like the off street
[3:43:53]
or the offside shuttle. I've personally
[3:43:56]
been at concerts where I've taken a
[3:43:58]
shuttle to the concert. I've done a
[3:44:00]
patron of concert where I've gone by
[3:44:02]
myself and I've gone with a load of
[3:44:04]
eight people in the suburban right.
[3:44:08]
So there's a lot of positives. Now where
[3:44:10]
we've had disagreement and now we're in
[3:44:13]
agreement is the 90% 10%
[3:44:17]
um directional distribution directional
[3:44:20]
split and we started off with 6535.
[3:44:24]
We're now in agreement at the 9010. How
[3:44:27]
we came to that just so you're aware the
[3:44:31]
population of Salt Lake County, Utah
[3:44:33]
County, Summit County, and Wasach County
[3:44:37]
total that combined population summit
[3:44:40]
and was made up only 4% of the
[3:44:43]
population.
[3:44:45]
However, with that being said, there are
[3:44:48]
a lot of people up in Mil Creek Conway
[3:44:50]
area that have direct easy access to
[3:44:53]
I80, which is direct easy access to US
[3:44:56]
40, which is pretty direct access to US
[3:44:58]
189. So, we're very comfortable with the
[3:45:02]
9010 split or directional distribution
[3:45:04]
that they come up with.
[3:45:07]
um their team is working on some
[3:45:10]
simplification
[3:45:11]
of the planning associated with
[3:45:15]
University Avenue, how long it takes to
[3:45:17]
get to a certain point from University
[3:45:19]
Avenue to the venue or to the to the um
[3:45:24]
interchange at Mount Canyon. And then
[3:45:26]
also on State Route 52, which is 800
[3:45:30]
North, they [clears throat] are working
[3:45:32]
on that too. So what our recommendation
[3:45:35]
to them has been since we visited with
[3:45:37]
them is to put these in minutes and
[3:45:40]
seconds. People can relate to minutes
[3:45:42]
and seconds. We're always get confused.
[3:45:46]
Your perspective of congestion may be
[3:45:47]
very different from my perspective of
[3:45:49]
congestion. Right? When we talk level
[3:45:52]
service D or level service A or level
[3:45:54]
service failure, um that's different
[3:45:57]
from someone moving from California than
[3:45:59]
it is moving from Texas to here. Right?
[3:46:02]
So everybody has a little bit different
[3:46:03]
perspective but we all have one thing in
[3:46:05]
common and that is time in minutes and
[3:46:07]
seconds. So we expect that that will
[3:46:11]
eventually be shown in the way that will
[3:46:13]
be easily understandable not only to us
[3:46:16]
but also to the public. Uh, I think
[3:46:19]
that's the only thing I will say that uh
[3:46:22]
when we talk about occupancy per
[3:46:24]
vehicle, I was kind of at the three
[3:46:26]
person thing, but they've done industry
[3:46:30]
standard surveys and came up with the
[3:46:32]
3.5. So, I think there's some
[3:46:34]
reasonleness to it. At the end of the
[3:46:37]
day, I'm a guest reviewer basically,
[3:46:40]
right? uh UD do is the permitting agency
[3:46:45]
uh for this uh permit and access permit
[3:46:48]
and what needs to be done.
[3:46:50]
>> Any questions?
[3:46:52]
Contin,
[3:46:53]
>> can you explain
[3:46:56]
their what that means for them to to you
[3:47:01]
for you to pass off? What what's that
[3:47:03]
process like? What does that mean?
[3:47:06]
um
[3:47:09]
they will have to submit an application
[3:47:11]
because this is a private access and not
[3:47:14]
a public access. So any public roads
[3:47:17]
that we have that coming into um state
[3:47:21]
routes in Purple City, I have to be the
[3:47:24]
applicant for on behalf of Purple City
[3:47:26]
because they're public roads. Because
[3:47:28]
this is a private access, they have to
[3:47:30]
be the applicant. And UD do will go
[3:47:32]
through a pretty strict review of this
[3:47:35]
intense traffic study. And some of the
[3:47:37]
numbers that they'll get into are
[3:47:40]
numbers that people just want to see in
[3:47:41]
appendices. And some of the numbers
[3:47:43]
they'll they'll push back on and some of
[3:47:46]
the numbers they'll agree with just like
[3:47:47]
I have. But they're the permitted
[3:47:50]
agency, not us.
[3:47:52]
>> And where is that dedicated right-hand
[3:47:55]
turn lane from
[3:47:59]
US 189 to 8 North in on the process? Is
[3:48:03]
it going to be funded in five years?
[3:48:05]
Should they not even have funding for
[3:48:06]
it? Do they not care?
[3:48:09]
Well, it's a better person to answer
[3:48:11]
that, but I would say that it would need
[3:48:13]
to be opening day,
[3:48:16]
>> right? Is that what you're anticipating?
[3:48:17]
>> 100%. And I think Becky, your question
[3:48:19]
is where is you do stand in terms of the
[3:48:22]
funding for that? Is that
[3:48:23]
>> Yes. Yes. Because you know, normally
[3:48:25]
that would go what? Through MAG and you
[3:48:27]
guys would vote on that and or is that
[3:48:30]
UD do state funding to get that done?
[3:48:34]
And there's normally like a
[3:48:36]
>> Yeah, you don't UD will not put money
[3:48:39]
toward this. In fact, it's
[3:48:41]
>> at the at the interchange at the mouth
[3:48:43]
of the canyon. It's not even our
[3:48:45]
regional transportation plan. It will be
[3:48:48]
in this new update. I guarantee you
[3:48:50]
that. There's been a lot of comments
[3:48:52]
about that because we're starting to see
[3:48:54]
congestion at the interchange at certain
[3:48:56]
PM peak hours. So, UD do is not funding
[3:49:00]
this. The private sector will be funding
[3:49:02]
it. And what's nice about that is we get
[3:49:05]
a 247 improvement
[3:49:08]
to a roadway that is going to be used by
[3:49:12]
the private sector three or four times a
[3:49:15]
week.
[3:49:16]
>> So you guys are going to be responsible
[3:49:18]
to pay for that dedicated right-hand
[3:49:20]
turn.
[3:49:21]
>> So we will work with you do as through
[3:49:23]
like a public private partnership
[3:49:25]
relationship. Um,
[3:49:28]
we are we are like Vern talked about, we
[3:49:31]
are a small part of those that would use
[3:49:33]
it. It it benefits the region and so the
[3:49:35]
region UD do would have a have a role to
[3:49:37]
play in paying for that improvement. So
[3:49:39]
it would be a combined public private
[3:49:41]
partnership with us and with UD do they
[3:49:43]
don't have that on their map right now
[3:49:44]
to Vern's point of of funding. Um, but I
[3:49:47]
think with MAG, the 2027 is when they
[3:49:51]
adopt the new MAG plan and then that
[3:49:53]
those priorities are all situated and
[3:49:55]
you know Karen Karen McCandless, Mayor
[3:49:58]
Judkins, you know, all the mayors will
[3:49:59]
be on there and they'll vote for the
[3:50:01]
priorities of those things that then get
[3:50:02]
translated to UD do and then they put it
[3:50:04]
in their system. But yeah, it's it's got
[3:50:06]
to be it's got to be funded and it's got
[3:50:08]
to be part of part of the project.
[3:50:09]
>> So, where are you with their private
[3:50:12]
public partnership with have you
[3:50:14]
applied? Have you had a conversation
[3:50:15]
with them? And what's going on with
[3:50:17]
that? Where are you at?
[3:50:18]
>> That's a great question. We have to
[3:50:19]
submit the application. Um, we've Sorry.
[3:50:22]
We we've got to we've got to formalize
[3:50:24]
our application and finalize that to UD
[3:50:26]
do in order to have these conversations.
[3:50:28]
So, we've had the preapp, we've started
[3:50:30]
the process with UD do, we've had
[3:50:31]
multiple conversations with them. Um,
[3:50:34]
but that's the next step is we've got to
[3:50:36]
get the overall project approved. We've
[3:50:38]
got to get UD do to to to support the
[3:50:41]
analysis that we've done. And then at
[3:50:43]
that point, once that's all approved,
[3:50:45]
then we go in and have that conversation
[3:50:47]
in a much more in-depth way with them in
[3:50:49]
terms of the public private partnership.
[3:50:51]
But right now, UD do's looking at us
[3:50:52]
saying, "Well, you don't you don't have
[3:50:53]
a project. Until you get it approved
[3:50:55]
through Provo City, there's not much we
[3:50:57]
can do." So, we're having the
[3:50:58]
conversations on the traffic analysis
[3:50:59]
and those improvements that need to be
[3:51:01]
made, but right now, they wouldn't talk
[3:51:03]
about funding that until this is
[3:51:04]
approved and we've moved moved further
[3:51:06]
down the path.
[3:51:10]
» Okay. Thank you. um Vern. So in we have
[3:51:14]
35 minutes. Let's um and I know the team
[3:51:19]
started the meeting indicating they hope
[3:51:21]
to leave with a list of questions that
[3:51:24]
council member have council members have
[3:51:26]
that they could answer.
[3:51:27]
>> Yeah.
[3:51:28]
>> Um I know they're willing to do
[3:51:29]
additional meetings uh offline with
[3:51:31]
individual council members. Um, I'd like
[3:51:34]
to share part of my five minutes with
[3:51:36]
Brian Jones. Uh, and he wanted to make
[3:51:40]
some clarifying comments relative to
[3:51:42]
this body, what roles we play and
[3:51:45]
responsibilities we have.
[3:51:48]
>> Great. Thanks, Gary. Um, so I have some
[3:51:51]
comments I wanted to make and this is my
[3:51:54]
comments are mostly actually directed at
[3:51:55]
the public. The council already knows
[3:51:57]
this. I think the applicant already
[3:51:59]
knows this, but you as as you know,
[3:52:01]
you've been getting a lot of public
[3:52:02]
comment and um there are a few things I
[3:52:06]
think that a few items that I think
[3:52:08]
would help make that public comment more
[3:52:10]
impactful. So, none of this is this is
[3:52:13]
not intended to reduce public comment. I
[3:52:15]
know that the council loves public
[3:52:17]
engagement. This is essentially advice
[3:52:19]
on how to make your comments more
[3:52:20]
impactful by understanding the process
[3:52:22]
better. So, the first thing that I
[3:52:24]
wanted to say because of some of the
[3:52:25]
comments we've been getting is that
[3:52:28]
Provo operates under the council mayor
[3:52:30]
form of government, which is actually
[3:52:31]
pretty unusual in the state of Utah.
[3:52:33]
There's not that many cities that
[3:52:34]
operate under this form of government.
[3:52:36]
It has strict separation of powers
[3:52:38]
between the mayor and the and the
[3:52:40]
council like the federal and the state
[3:52:42]
system. So, it's actually illegal for
[3:52:45]
the council to direct executive branch
[3:52:48]
staff in the in the execution of their
[3:52:50]
duties.
[3:52:52]
However, the council is the final say on
[3:52:55]
land use matters. So, land use
[3:52:57]
applications go to the council. Uh, real
[3:53:00]
estate transactions are a little bit
[3:53:01]
weird because uh according to Supreme
[3:53:04]
Court case law, they are an executive
[3:53:06]
branch branch function, but they must be
[3:53:09]
approved by the council. So, neither the
[3:53:12]
council nor the executive branch can
[3:53:15]
sell, dedicate, dispose of, including
[3:53:18]
putting conservation easements on
[3:53:20]
property by themselves. Both branches
[3:53:22]
have to be involved in that.
[3:53:24]
>> Um, just clarify what you mean by land
[3:53:26]
use applications for the public.
[3:53:28]
>> Yes. So, I'm talking about reszone the
[3:53:29]
reszones and general plan uh map
[3:53:32]
amendments. Right. So, those kind of
[3:53:33]
applications are the are the council's
[3:53:35]
domain. Um, the other thing that I
[3:53:38]
wanted to address that I've heard is uh
[3:53:40]
every applicant is entitled to a
[3:53:44]
complete review of their application. So
[3:53:46]
sometimes one of the things that I've
[3:53:47]
started to hear more and more recently,
[3:53:48]
not just on this project, is comments
[3:53:51]
along the lines of, "Shame on you for
[3:53:53]
letting this get this far in the process
[3:53:56]
to directed at the council." Right? And
[3:53:58]
so one of the things I wanted to say is
[3:54:01]
in a system built on due process and
[3:54:03]
property rights, applicants have the
[3:54:05]
right to have their application fully
[3:54:07]
vetted and fully heard. it would be just
[3:54:09]
as inappropriate for the council to
[3:54:11]
terminate someone's application before
[3:54:13]
they've gone through the process as it
[3:54:15]
would for them to approve it before the
[3:54:17]
public got to comment on it. So that's
[3:54:19]
just part of the part of the process.
[3:54:21]
And the thing I would add on to that is
[3:54:24]
the fact that it is on the agenda does
[3:54:26]
not mean that there is a predisposal to
[3:54:28]
approve it. The fact that it's on the
[3:54:30]
agenda means someone has applied and
[3:54:32]
we're going through the process. So
[3:54:35]
directing comments towards the merits of
[3:54:37]
the project instead of assumptions about
[3:54:40]
why it's on the agenda in the first
[3:54:42]
place, I think is much more useful when
[3:54:43]
you're giving public feedback to the
[3:54:46]
council.
[3:54:47]
Uh development agreements, I wanted to
[3:54:49]
talk really briefly about those. Um,
[3:54:52]
development agreements happen when
[3:54:54]
there's a reason application. And
[3:54:56]
because the council is the body that
[3:54:59]
approves reszones, they are the body
[3:55:00]
that approves development agreements,
[3:55:02]
which creates a weird situation because
[3:55:05]
the council is the negotiating party,
[3:55:09]
but they don't see the development
[3:55:10]
agreement until the application comes to
[3:55:14]
them in council meeting. So, there have
[3:55:16]
been a lot of comments uh about the
[3:55:18]
development agreement and why it's not
[3:55:20]
farther along than it is. As I mentioned
[3:55:22]
in one of the earlier agenda items
[3:55:24]
today, the typical process is actually
[3:55:26]
that the council doesn't even see
[3:55:28]
development agreements until they're
[3:55:30]
about ready to vote. And sometimes they
[3:55:32]
don't even see the agreement. They just
[3:55:34]
vote on the proposal and the agreement
[3:55:37]
gets executed later. Sophisticated
[3:55:40]
developers like Vesper [clears throat]
[3:55:42]
sometimes will propose development
[3:55:43]
agreements early, but that creates a
[3:55:46]
two-step process where staff is re at up
[3:55:50]
to this point has been reviewing the
[3:55:51]
development agreement to help the
[3:55:54]
developer clarify what their proposal
[3:55:57]
is. The fact that we have a draft in
[3:56:00]
hand does not mean staff is already 100%
[3:56:03]
signed off on it, that the executive
[3:56:05]
branch is already ready to recommend
[3:56:07]
approval of that. It means that we have
[3:56:10]
a clarified proposal of what the
[3:56:13]
developer is willing to profer ready for
[3:56:15]
the council to review and give feedback
[3:56:17]
on and ask for changes to and and say
[3:56:21]
which parts they're not satisfied with
[3:56:24]
which leads into uh the point that I
[3:56:26]
have for the council which is I know
[3:56:28]
we're this is probably a vain hope in
[3:56:31]
the amount of time that we have left but
[3:56:33]
what staff is really hoping for from the
[3:56:35]
council is not just comments back to the
[3:56:38]
developer about additional information
[3:56:40]
that they need. But the things that you
[3:56:43]
think are deficient about both of the
[3:56:45]
agreements, the things that you as a
[3:56:48]
council want to see changed both in
[3:56:50]
terms of uh things that are missing or
[3:56:53]
things that you want changed. And again,
[3:56:55]
because you act as a body, be very
[3:56:57]
helpful to the degree possible that
[3:56:59]
those things are presented through
[3:57:00]
motions so that we know what the body
[3:57:02]
wants rather than individual counselors.
[3:57:06]
Um,
[3:57:08]
and that I think that's everything I
[3:57:09]
had. Any questions about any of that?
[3:57:13]
>> You just address
[3:57:15]
the OSPR question.
[3:57:18]
>> Oh, yes. So, one of the That's a great
[3:57:20]
question. So, one of the public feedback
[3:57:22]
items that we've received so far, was
[3:57:24]
there was a comment that was submitted
[3:57:26]
that said that the OSPR, which the open
[3:57:29]
space and preservation uh zone, which is
[3:57:32]
one of the city zones, and it applies to
[3:57:34]
this property, that it requires
[3:57:37]
legally that if any property is taken
[3:57:39]
out of that zone, an equal amount of
[3:57:41]
property must be placed back into the
[3:57:43]
zone. And the contention was it would be
[3:57:46]
illegal for the city to reszone this
[3:57:48]
property without reszoning other
[3:57:50]
property.
[3:57:52]
If you look at the zone, that phrase
[3:57:55]
came out of the purposes and objective
[3:57:57]
section at the beginning of the chapter
[3:57:59]
and it doesn't it doesn't include the
[3:58:01]
entire sentence. The sentence starts
[3:58:03]
with it is intended that and then it
[3:58:07]
continues on and says that about the
[3:58:09]
replacement. So that contention is that
[3:58:13]
it's an accurate statement about what
[3:58:14]
the council through the city code has
[3:58:17]
said about policy objectives in the
[3:58:20]
past. It is not a legal requirement. So
[3:58:23]
it is not illegal to remove property
[3:58:25]
from the OSPR without replacing it.
[3:58:29]
>> Any other questions about that?
[3:58:30]
>> Great. Thank you, Brian. Very helpful.
[3:58:33]
Um Travis, can should we start with you?
[3:58:36]
>> I'll come back.
[3:58:37]
>> Okay, Jeff. Well, actually, can I say
[3:58:40]
this?
[3:58:40]
>> Uhhuh.
[3:58:41]
>> Brian was telling me that there's a few
[3:58:43]
things that he would really like to come
[3:58:45]
away with from this meeting. And so, I
[3:58:48]
guess I just want to be cognizant of
[3:58:49]
that because if we don't, then we kind
[3:58:51]
of have to have another meeting,
[3:58:52]
>> right? Um, which we probably will have
[3:58:54]
to have more meetings anyways. But I
[3:58:56]
just I guess I just wanted to bring that
[3:58:57]
up like I don't necessarily need all of
[3:59:00]
my questions addressed today, but if
[3:59:02]
Brian and staff are like, "Hey, we
[3:59:03]
really need these answered from the
[3:59:05]
council." I'd be willing to give my time
[3:59:07]
up for that. So, I just wanted to throw
[3:59:10]
that out there that if we're short on
[3:59:12]
time, there might be things we want to
[3:59:13]
say. Brian, what do you need to know
[3:59:15]
from us? I So, sorry not to cut Jeff off
[3:59:18]
or anybody else can talk whatever say
[3:59:20]
whatever they want, but I just wanted to
[3:59:22]
>> make sure we're covering what we really
[3:59:24]
need to cover today.
[3:59:24]
>> I appreciate that, Councilman. The two
[3:59:26]
most important from my perspective
[3:59:27]
actually have to do with the purchase
[3:59:29]
agreement and not with the development
[3:59:30]
agreement. And that is there's been a
[3:59:32]
lot of discussion about whether this big gate structured framework is
[3:59:37]
workable or not. And if you've seen the
[3:59:39]
latest draft, one of the things that it
[3:59:41]
has changed from previous drafts is it defines which gates are under the
[3:59:46]
council's control, which are the ones
[3:59:47]
about the property transaction. Well,
[3:59:50]
the whole reason we're doing this gate
[3:59:52]
structure is because we just haven't
[3:59:53]
answered any of those questions yet. But
[3:59:55]
if the council as a body could tell us
[3:59:58]
today
[3:59:59]
how much and again I want to make clear
[4:00:02]
that by answering these questions you're
[4:00:04]
not preapproving the project or even
[4:00:06]
suggesting that you're in favor of it's
[4:00:08]
more like what would the answer have to
[4:00:10]
be for you to even consider it further
[4:00:12]
right and the two questions are what
[4:00:15]
property would you be willing to sell
[4:00:18]
whether the exact acreage and legal
[4:00:20]
description of what you would be willing
[4:00:21]
to sell whether it's the entire parcel
[4:00:23]
or just the parcel that they're
[4:00:25]
developing uh is a really important
[4:00:27]
question for that document. The other
[4:00:29]
one is they've proposed a land trade and
[4:00:32]
they've proposed a specific piece of
[4:00:33]
specific parcel for the trade. Is that
[4:00:36]
parcel acceptable for you as a trade? If
[4:00:39]
you answered those two questions, the
[4:00:41]
entire face of the real estate purchase
[4:00:43]
agreement could could change between now
[4:00:45]
and the next meeting and look more like
[4:00:48]
a regular purchase agreement where
[4:00:50]
there's just exhibits with the with the
[4:00:53]
property descriptions and you're just
[4:00:55]
doing a regular land deal instead of
[4:00:57]
these gates.
[4:00:59]
>> Great. Thank you.
[4:01:01]
uh councelor Whitlock
[4:01:04]
other things you need from them that
[4:01:05]
you'd like them to address more
[4:01:08]
information that to get to you or and
[4:01:10]
again they can schedule oneoffs as well.
[4:01:14]
Yeah, I I [clears throat] think I have a
[4:01:17]
lot of questions, but I'm not necess of
[4:01:19]
them are actually
[4:01:21]
to the city also. Um I'd have to
[4:01:25]
organize my thoughts if I if I ones that
[4:01:28]
are specifically like outstanding
[4:01:29]
questions to the the developer, but I'll
[4:01:32]
just list them and people can decide. So
[4:01:34]
one of the questions I have is um so
[4:01:37]
[clears throat] we have we have in our code a certain requirement of
[4:01:43]
number of parking stalls per se. I think
[4:01:46]
it's 4 to one. And I'm curious if if
[4:01:50]
this if the city staff or if the
[4:01:51]
developer knows
[4:01:54]
are there any venues close to that size
[4:01:56]
that are parked to code like for example
[4:01:57]
the Marriott Center actually parked to
[4:02:00]
code at that ratio
[4:02:02]
is LLA or stadium.
[4:02:07]
» That's a question I'd like to understand
[4:02:08]
just because I think it helps it would
[4:02:09]
help us and the public can see kind of
[4:02:12]
the ratios we're talking about. Another
[4:02:15]
question I have is um
[4:02:18]
>> but but specifically Jeff the 4:1 number
[4:02:20]
because it's in the city's provo city's
[4:02:22]
code.
[4:02:23]
>> Yeah, that would be about 5,000 sold
[4:02:25]
you're talking about doing actually
[4:02:26]
you're thinking about being a little bit
[4:02:27]
less than that but I imagine we give
[4:02:28]
them an exemption on that but I'm not
[4:02:30]
>> when you when you add the hotel and when
[4:02:33]
you add the retail the the calculation I
[4:02:35]
think was 5,125 or something like that.
[4:02:38]
>> That's right. That's makes sense to me.
[4:02:42]
Uh, another thing is that that there's a
[4:02:45]
line in the development agreement um
[4:02:50]
that says consider and where appropriate
[4:02:53]
support and administer ting tax
[4:02:55]
increment financing. and and I was just
[4:02:58]
I'm very curious about more details on
[4:02:59]
that like what I I know it's early to to
[4:03:04]
um get all the specifics about that. But
[4:03:06]
even if there's like a proposed
[4:03:08]
framework or understanding of like what
[4:03:09]
the ask will be because I feel like
[4:03:11]
within that language, we could move
[4:03:14]
forward and find the ask is a 9010 split
[4:03:16]
on a $10 million cap or $20 million cap
[4:03:19]
because that's ultimately what would
[4:03:20]
require to get this pencil on their end
[4:03:23]
and that puts us in a bit of an awkward
[4:03:24]
position. Now, I think the develop I
[4:03:27]
think development will allow us at that
[4:03:28]
point to pull back, but is that any
[4:03:30]
that's I have questions around that. Um,
[4:03:32]
I think that's what I have for now. I'd
[4:03:34]
have to look at my notes a little bit
[4:03:34]
more.
[4:03:35]
>> Okay. Thank you, Jeff. Councelor Bogden,
[4:03:39]
>> I think we need to get to Brian's
[4:03:41]
questions as well. I think I'm
[4:03:45]
I've asked a lot of public questions
[4:03:47]
here, but the one thing that I would
[4:03:49]
need to know before I could say how much
[4:03:52]
land are we willing to sell or willing
[4:03:53]
not to sell is what is your thing for
[4:03:57]
the conservation ement? Because to me, I
[4:04:00]
would say no, I'll only sell you this
[4:04:02]
much land and we'll put this in the
[4:04:03]
conservation easement. But I need to
[4:04:05]
know that before I can make that one
[4:04:08]
decision that Brian wants today.
[4:04:10]
>> Okay. But I guess are you saying by that you would be willing to sell them
[4:04:14]
the entire parcel if the conservation
[4:04:16]
easement specifics met your approval? Is
[4:04:19]
that fair?
[4:04:21]
>> Okay.
[4:04:24]
» Follow-up question, council.
[4:04:25]
>> Sorry, I've got my I got my my notes
[4:04:27]
together now. So the other uh
[4:04:31]
the other question I'd like to see this
[4:04:32]
is for the developers is or or the
[4:04:34]
Vesper project is you gave this
[4:04:38]
distribution of of um people coming into
[4:04:41]
the venue which I think was very
[4:04:42]
helpful. Thank you. That's a great
[4:04:43]
analysis. And then you asserted at the
[4:04:46]
end it's going to be similar leaving.
[4:04:48]
That was contradictory to my experience
[4:04:50]
having experienced events is people
[4:04:52]
leave a lot faster than they come. like
[4:04:53]
you go to BYU game day and you it's a
[4:04:55]
slow trickle in and then everyone leaves
[4:04:57]
at once.
[4:04:58]
>> So I would like to see data backing up
[4:04:59]
that assertion because it it ring ring
[4:05:02]
untrue to me.
[4:05:02]
>> Yeah.
[4:05:03]
>> Um another another question I had is um
[4:05:08]
what so again this might be hard
[4:05:11]
difficult to do but even if it's just
[4:05:12]
thoughts or frameworks. So you mentioned
[4:05:14]
there's going to need to be some private
[4:05:15]
public partnership in funding the
[4:05:18]
overpass. Are there any other elements
[4:05:20]
of infrastructure investments that will
[4:05:22]
require public support? And I understand
[4:05:25]
that there will be additional public
[4:05:26]
benefits apart from this arena or uh
[4:05:30]
amphitheater, but that's something I
[4:05:31]
would like to understand better to the
[4:05:32]
degree that you can share it. Again, I
[4:05:34]
understand it might be limited. Um, and
[4:05:37]
then
[4:05:39]
this is something you shared a little
[4:05:40]
bit and I have a better understanding
[4:05:42]
after a recent meeting I have, but um,
[4:05:45]
one of the me one of the big concerns I
[4:05:47]
think from the planning commission was
[4:05:49]
sort of the the rate of utilization.
[4:05:51]
It's been said here a couple times
[4:05:52]
tonight of it'll be two to three shows a
[4:05:54]
week or three to four shows a week. I
[4:05:56]
I'd like to understand a little bit
[4:05:58]
better. I'm not saying I think from your
[4:06:01]
incentives, you're incentivized to do as
[4:06:02]
many shows there as possible,
[4:06:03]
>> right? But I think um
[4:06:07]
is there like is there any a willingness
[4:06:09]
or agreement to to sort of put
[4:06:11]
parameters on that because I guess I
[4:06:13]
think the public the worst outcome from
[4:06:15]
the public in this situation is 365
[4:06:18]
shows a year and again this is probably
[4:06:19]
practically unrealistic because there's
[4:06:20]
a market capacity but I'm just
[4:06:22]
illustrating an extreme example. Yeah.
[4:06:24]
365 shows a year at various times. We
[4:06:27]
are getting an assertion from you all
[4:06:28]
that this will be a couple shows a week
[4:06:30]
and it'll be perfectly land sort of
[4:06:32]
where people come in off sites pe pe pe pe pe pe pe pe pe pe pe pe pe peak hours and people leave
[4:06:35]
out of peak hours but is that always
[4:06:37]
going to p be the case like will a show
[4:06:39]
on Saturday start at 2 p.m. example, in
[4:06:41]
which case it would land right on the
[4:06:43]
problematic area. So, details on that
[4:06:46]
would be helpful.
[4:06:48]
Last, this is probably more of a public
[4:06:50]
works question, but I'm curious about
[4:06:52]
storm drain and the river. This is a lot
[4:06:54]
of added concrete right next to Pro
[4:06:57]
River and that's something that I given
[4:06:59]
just the council's emphasis on river
[4:07:01]
health and river quality, that's
[4:07:03]
something that I have questions about.
[4:07:04]
And then Brian to answer your questions,
[4:07:07]
I would personally be more comfortable
[4:07:08]
with just selling the land they need.
[4:07:10]
Um,
[4:07:13]
in sort of a roundabout like I the sort
[4:07:15]
of sell the land and then give it back
[4:07:17]
to you in terms of conservation seems a
[4:07:19]
bit convoluted. I think just sell the
[4:07:21]
land they need and it seems the
[4:07:23]
cleanest. That's my that's my initial
[4:07:25]
reaction. And then to the second
[4:07:27]
question, I need to look at it more. I
[4:07:29]
don't know if I can answer that today.
[4:07:30]
Sorry. That's 25.
[4:07:31]
>> And can we get the questions, Brian,
[4:07:34]
that everybody asks to the entire
[4:07:36]
council, not just to each individual
[4:07:38]
council member, please?
[4:07:40]
>> Yeah, sure.
[4:07:41]
>> Something that even because a lot of
[4:07:42]
these are public questions as well,
[4:07:44]
>> right?
[4:07:45]
>> Something that we can share with the
[4:07:47]
public as well.
[4:07:48]
>> Yeah. So, you're just asking for a list
[4:07:49]
of the questions that are being asked.
[4:07:51]
>> Well, as you respond to them, let's
[4:07:53]
circulate the information. Got Yeah,
[4:07:55]
>> because you know his questions are going
[4:07:57]
to overlap with mine, but I'm going to
[4:07:59]
wait for mine because we have so much
[4:08:02]
time and we've got things that we've got
[4:08:03]
to get done.
[4:08:04]
>> Right. Okay.
[4:08:05]
>> Okay. Let's move to our counselors um
[4:08:07]
online. Um let's start with councelor
[4:08:10]
Katrice Mccay and then councelor Rachel
[4:08:12]
Whipple and then councelor Craig
[4:08:14]
Christensen. Katrice.
[4:08:28]
» Rachel, are you ready? Would you like to
[4:08:30]
go ahead while I text Krice?
[4:08:32]
>> Um, yes, I can. Go ahead. So, a lot of
[4:08:35]
my questions have to do with the
[4:08:37]
conservation easement or not. Um,
[4:08:41]
thinking about it, I would think that a
[4:08:43]
conservation easement on this would be
[4:08:45]
pretty expensive because you're selling
[4:08:47]
the right to develop and we've already
[4:08:49]
proven that this area is a viable quarry
[4:08:52]
and everything. So, I'm a little
[4:08:55]
concerned about,
[4:08:57]
you know, those potentially expensive
[4:09:00]
development rights and extraction rights
[4:09:03]
making the conservation easement really
[4:09:05]
expensive. Um I would also want to have
[4:09:10]
some kind of binding commitment about
[4:09:13]
the terms of the conservation easement.
[4:09:16]
Um you know I would want in that area
[4:09:19]
protected to have no commercial, no
[4:09:21]
residential and no further extraction
[4:09:25]
um activities. I would be happy to have
[4:09:29]
trails there. I think it would make
[4:09:30]
sense possibly to have restrooms there
[4:09:33]
as like trail head support. Um, I would
[4:09:37]
even be okay with something like a
[4:09:38]
pavilion or something, you know, so you
[4:09:40]
can like a little nature school or
[4:09:43]
something like that. But I would want
[4:09:46]
this area to be very strictly bounded so
[4:09:50]
that the concerns of commercial creep
[4:09:54]
would be addressed. So like no tram.
[4:09:57]
We're definitely not building a tram up
[4:09:58]
the mountain from the amphitheater.
[4:10:00]
Something like that. If we go with the
[4:10:05]
alternate proposal where the city only
[4:10:07]
sells the land that will be necessary
[4:10:09]
for the development, I understand that can't be fully defined until after
[4:10:15]
all of the geotechnical studies and
[4:10:17]
other things are done because the
[4:10:19]
buildings may need to be adjusted on the
[4:10:20]
site. And so there may be a little bit
[4:10:22]
of of wiggling on what the exact shape
[4:10:26]
of the land to be conveyed would be. Um,
[4:10:29]
but if we don't sell all the land, I
[4:10:32]
would really like to explore doing some
[4:10:34]
sort of a partnership with Vesper to do
[4:10:39]
trail improvements on the land that
[4:10:41]
remains in Provo City so that we would
[4:10:45]
still have that enhanced outdoor space
[4:10:48]
access for recreation opportunities for
[4:10:51]
our community. So, I basically I'm I'm
[4:10:56]
saying I'd want to have trail
[4:10:58]
improvements on on an area that we own.
[4:11:02]
Um
[4:11:05]
I also have questions with that where
[4:11:09]
the gun club ends up being if it needs
[4:11:12]
to be relocated. I think that the gun
[4:11:16]
club use probably is not super
[4:11:18]
compatible with an amphitheater use and
[4:11:21]
so it probably would need to be
[4:11:23]
relocated even if we aren't selling the
[4:11:25]
exact land out from under the gun club
[4:11:28]
and so I'd like to know a little bit
[4:11:30]
more about that. I haven't gotten to go
[4:11:33]
shooting there yet, but I understand
[4:11:34]
that it's a really popular facility and
[4:11:37]
so I want to keep that as an asset for
[4:11:39]
our community. But I also recognize that
[4:11:42]
if we move it, there will need to be
[4:11:44]
some sort of sight mitigation because of
[4:11:46]
the lead and shells and other things
[4:11:49]
that have frankly contaminated that area
[4:11:52]
through its use of the gun club. So I
[4:11:55]
want us to be able to look into that
[4:12:00]
on the parking everything. I I do repeat
[4:12:07]
Jeff's skepticism about the exit times.
[4:12:11]
People generally do want to all leave at
[4:12:13]
the same time because the thing is done
[4:12:15]
unless you're doing I don't know some
[4:12:18]
sort of after show things to entice a
[4:12:20]
portion of the people to stay longer. Um
[4:12:23]
but it's not like people are are
[4:12:25]
generally leaving,
[4:12:27]
you know, in the fifth inning or
[4:12:29]
something. So I'm I'm concerned about
[4:12:32]
that.
[4:12:34]
And while Vern
[4:12:37]
really wanted to push it to the 9010
[4:12:40]
split coming from Heber, I've been
[4:12:43]
talking to some people who do live in
[4:12:45]
the Park City, Heber, Midway, and a lot
[4:12:50]
of them are actually quite excited about
[4:12:51]
this. They're looking at doing another
[4:12:55]
kind of amphitheater venue up there on
[4:12:57]
the other side of the canyon to be much
[4:12:58]
smaller than this. But even though
[4:13:01]
there's a smaller portion of the
[4:13:03]
population there,
[4:13:05]
um the
[4:13:07]
I think there's likely a good portion of
[4:13:12]
those residents who would have the
[4:13:14]
disposable income to come down and
[4:13:17]
attend
[4:13:19]
um events at this venue. So, I think it
[4:13:22]
may be more than 10%, but I'm I'm happy
[4:13:26]
that Vern is acting as our skeptical
[4:13:28]
traffic guard and and policing them and
[4:13:33]
examining their numbers for us.
[4:13:37]
I'm I'm really happy to see how much
[4:13:41]
this has changed. I think some changes
[4:13:43]
are are still appropriate, but I think
[4:13:47]
the biggest concern that I have right
[4:13:48]
now is how we end up surrounding the
[4:13:52]
project so that there is no creep so
[4:13:56]
that it remains fully defined now and in
[4:13:59]
perpetuity.
[4:14:03]
» Thank you, Rachel. Well, well said,
[4:14:06]
Councelor McKay.
[4:14:12]
» Hey. Okay. Um, [clears throat] okay. So,
[4:14:16]
it talks about the number 20,000. My
[4:14:19]
question is, does does this amphitheater
[4:14:22]
have grass seating?
[4:14:27]
» Um,
[4:14:28]
>> like is it going to have seating beyond
[4:14:29]
the bench seats?
[4:14:32]
Right now we've just we've just
[4:14:33]
anticipated it all being uh in seats but
[4:14:36]
there will be grass in the area Crice.
[4:14:38]
Um
[4:14:40]
>> but you will not be selling tickets to
[4:14:42]
those grass seats.
[4:14:44]
>> No.
[4:14:45]
>> Okay. I would like that to be defined in
[4:14:47]
the
[4:14:48]
development agreement because I think
[4:14:50]
that when you be really specific that
[4:14:53]
you know we couldn't increase a capacity
[4:14:55]
through grass.
[4:14:57]
Um, now the trails, I didn't notice in
[4:15:00]
the development agreement that there was
[4:15:04]
information about the trails. It's
[4:15:05]
really important to me that we connect
[4:15:06]
all the trails. Um,
[4:15:09]
and I know that that was important to
[4:15:11]
you guys. So, I just want to make sure
[4:15:13]
that that is spelled out and will and
[4:15:18]
that the trails will be usable even when
[4:15:20]
events are going on. Like when you have
[4:15:21]
events at Sundance, per se, you can
[4:15:23]
still go up and hike or walk around or
[4:15:27]
like you're not infringed upon or like
[4:15:29]
limited in going around.
[4:15:33]
Um, so that's something I was thinking
[4:15:35]
about. Um, there's a big concern about
[4:15:39]
the commercial
[4:15:41]
and when I've talked to you, you've said
[4:15:43]
that it will indeed just be merch of the
[4:15:47]
artist while they're in concert. I think
[4:15:49]
we need to be much more specific about
[4:15:50]
that so that we don't have like the the
[4:15:53]
mall that people are terrified is going
[4:15:55]
to come up the canyon. Um we don't want
[4:16:00]
spots
[4:16:02]
to be leased for commercial ventures.
[4:16:05]
Now, I'm sure there will be events, you
[4:16:07]
know, where you do pop-up tents and
[4:16:08]
farmers markets or things like that, and
[4:16:10]
that's fine, but I want to make sure
[4:16:12]
that there's not commercial spa, that
[4:16:15]
we're not building out commercial space
[4:16:17]
up there, except for the artist merch to
[4:16:20]
be bought.
[4:16:22]
Um, now the food places, now the food
[4:16:26]
places, are they going to be running
[4:16:28]
even when the amphitheater is not going
[4:16:29]
on? And I do hope they are. I hope that
[4:16:31]
you're having food in restaurants that
[4:16:33]
will be available to the bikers and
[4:16:34]
hikers and visitors to the canyon.
[4:16:38]
Do is there a plan that those are going
[4:16:40]
to be open all the time? And I'm sure
[4:16:41]
there'll be more during a concert, but
[4:16:43]
that there will be still
[4:16:46]
food places that are open.
[4:16:48]
>> Yeah, we we'd have the we'd have the
[4:16:49]
hotel Krice that would obviously need
[4:16:51]
some of those services. So, the exact
[4:16:53]
number I don't know, but yeah, we will
[4:16:55]
have we will have something up there
[4:16:56]
that would be full-time for the
[4:16:57]
restaurants
[4:16:59]
>> that the public can access.
[4:17:00]
>> Correct.
[4:17:01]
>> Okay.
[4:17:04]
Um
[4:17:07]
I'm happy with the open space stuff, all
[4:17:09]
of that.
[4:17:11]
Um when after this after everything's
[4:17:15]
completed and we know the exact
[4:17:17]
conservation amount, not not amount but
[4:17:20]
location of where it is. Um will you
[4:17:24]
have to reveate that conservation? I
[4:17:26]
didn't notice that in the development
[4:17:28]
agreement.
[4:17:32]
» I think that's what it says, but we we
[4:17:34]
can double check for sure. That's the
[4:17:35]
intent is that we would want that
[4:17:37]
reveated and looking good as quickly as
[4:17:38]
we could get it. Right now you have the
[4:17:41]
noise weekends till midnight and
[4:17:43]
weekdays till 11. I know I go to Deer
[4:17:46]
Valley regularly and their their shut
[4:17:48]
off is 10 o'clock and I think that's
[4:17:52]
more appropriate. I think 10 on
[4:17:53]
weekdays, 11 on weekends. I think that
[4:17:56]
it's just not necessary to be 11 and
[4:17:57]
midnight. That seems too late.
[4:18:00]
Um
[4:18:02]
I like that the parking's limited to
[4:18:03]
acres. I think that was a smart move.
[4:18:05]
Um,
[4:18:08]
I am worried about the 3.5 per vehicle.
[4:18:14]
I don't know. I'm I'm worried that about
[4:18:16]
those
[4:18:19]
um projections and I am worried about
[4:18:21]
the
[4:18:22]
we still don't have enough numbers
[4:18:24]
because like absolutely the 800 always
[4:18:27]
having an automatic right turn is an
[4:18:28]
absolute necessity and all these things
[4:18:31]
but supposedly you're paying you're
[4:18:33]
going to have to pay for all of them
[4:18:34]
which seems infeasible. So, I we need a
[4:18:37]
better idea from you do or
[4:18:40]
exactly how much these things are going
[4:18:42]
to cost and what you guys are going to
[4:18:45]
do and what you're going to expect help
[4:18:47]
with, whether it's from the county or
[4:18:49]
you do
[4:18:51]
or um anyone else.
[4:18:54]
That just still feels like a big
[4:18:55]
unknown.
[4:19:00]
And that's all I got.
[4:19:03]
>> Thank you, Katrice. Councelor
[4:19:05]
Christensen,
[4:19:08]
>> I think most of my uh questions have
[4:19:10]
been answered. Um I had a chance to
[4:19:12]
connect with Brian this past weekend. It
[4:19:13]
was very helpful. Brian, um I would just
[4:19:15]
weigh in. I'm not sure why we would sell
[4:19:19]
land and then have that turned back into
[4:19:22]
a conservation easement. I mean, the
[4:19:23]
city can do that. Uh I I wouldn't see
[4:19:26]
selling any more land than was needed
[4:19:28]
for the site. Um, I would like to see,
[4:19:31]
as Becky pointed out, I would like to
[4:19:32]
see elevations of that parking lot as
[4:19:34]
you come north into that canyon. Um, how
[4:19:38]
that parking lot lays out uh would make
[4:19:40]
a difference. So, seeing seeing
[4:19:42]
elevations that would be helpful. Um, I
[4:19:46]
also I haven't seen the uh the proformer
[4:19:49]
that you put together for the in the
[4:19:50]
economic impact. Um, and I think it was
[4:19:54]
is it 2.3 million, Brian? Is it is that
[4:19:57]
right?
[4:19:57]
>> Yes.
[4:19:58]
So, um
[4:20:01]
I would imagine that that actually
[4:20:03]
becomes a bigger number over time as you the venue becomes more mature in
[4:20:08]
terms of its booking. Uh part of the
[4:20:11]
benefit of this big vision is the
[4:20:14]
economic impact.
[4:20:16]
Um wouldn't we see you've talked about
[4:20:19]
um you know when we talked on Saturday
[4:20:21]
you know you've talked about a few you
[4:20:24]
know like half a dozen or eight or nine
[4:20:26]
I don't remember the exact number you
[4:20:28]
know 20,000 uh seat events uh seems like
[4:20:32]
it would be in the best economic
[4:20:35]
development sense to see that be a much
[4:20:38]
bigger number and I think you had said
[4:20:41]
that that could actually grow and
[4:20:43]
develop over time. So, I'd like to see
[4:20:45]
what the projections are because that's
[4:20:49]
part of the attraction here is the
[4:20:50]
economic development. So, um I'd like to
[4:20:54]
see what that what those big, you know,
[4:20:57]
20,000 seat uh events look like as that
[4:21:01]
grows and matures or as the venue itself
[4:21:04]
matures. Does that make sense, Brian?
[4:21:06]
>> Yes.
[4:21:08]
And that number, Craig, that number is
[4:21:10]
in the fiscal impact analysis in terms
[4:21:12]
of a growth factor. Um and it assumes it
[4:21:15]
assumes the the model the annual model
[4:21:17]
assumes kind of um that it's stabilized.
[4:21:21]
So it wouldn't be it wouldn't be in the
[4:21:23]
first few years. But we can take a look
[4:21:24]
a little closer a little more closely at
[4:21:26]
that to make sure it addresses that
[4:21:27]
question. Craig.
[4:21:29]
>> Yeah, that's that's all I had. Thank
[4:21:31]
you.
[4:21:31]
>> Well, Craig, one thing I want to I want
[4:21:33]
to bring up is this is that's 2.3 to our
[4:21:36]
bottom line. So that's after it's all
[4:21:40]
that's not the gross sales tax revenue.
[4:21:42]
is something
[4:21:43]
like 500 million or something like that
[4:21:46]
but ultimately only a portion of that
[4:21:48]
comes back to Provo because
[4:21:50]
>> correct
[4:21:50]
>> you know the county
[4:21:51]
>> correct part anyway I just want to make
[4:21:53]
sure that that yeah
[4:21:55]
>> yeah if the top line grows the bottom
[4:21:56]
line is going to grow as well. I was
[4:21:58]
just wondering what does that as the as
[4:22:02]
the venue matures in terms of ticketing
[4:22:05]
and sales and things like that, what do
[4:22:08]
what does a 20,000 event uh frequency
[4:22:11]
look like as it matures because that
[4:22:14]
would impact that would have a huge
[4:22:15]
impact on on that number that eventually
[4:22:18]
trickles down to Provo.
[4:22:22]
>> Yep. No, that makes sense, Craig.
[4:22:25]
>> Thank you, Craig.
[4:22:26]
[clears throat and cough]
[4:22:27]
As I consider the um emails that come to
[4:22:30]
the council members, I I review them. I
[4:22:33]
put them into categories. What concerns
[4:22:36]
are? They clearly by a large percentage
[4:22:38]
fit into two areas. One is the
[4:22:41]
conservation preservation um category
[4:22:44]
and second is traffic flow congestion
[4:22:49]
um how we'll treat the the inflow and
[4:22:51]
outflow. It's been helpful today to get
[4:22:54]
this additional information and as you
[4:22:57]
convey any any more details in those
[4:23:00]
areas, that's really the most feedback
[4:23:02]
that we're getting from residents is are
[4:23:06]
those two issues.
[4:23:08]
Um,
[4:23:11]
and I think more information I did see
[4:23:13]
more information recently
[4:23:16]
uh released on uh numbers of events that
[4:23:19]
might be I know early on even in the
[4:23:22]
planning commission meeting Brian um you
[4:23:25]
mentioned we were unsure still as to how
[4:23:27]
many events but I've seen specific
[4:23:29]
numbers recently and I'm not sure if
[4:23:30]
they're accurate um Spencer but
[4:23:33]
[clears throat]
[4:23:33]
something like 10 large events per year
[4:23:35]
and 100 smaller events
[4:23:38]
So, I don't [clears throat] know if
[4:23:39]
that's accurate, but I know more
[4:23:41]
information is trickling now related to
[4:23:42]
that to that as well.
[4:23:45]
>> I think Gary to address that concern, I
[4:23:47]
think it makes sense for us to put
[4:23:48]
together just kind of a high level of
[4:23:50]
some of the assumptions that we're
[4:23:51]
making on that. Yeah,
[4:23:52]
>> we worked with Cody on some of those
[4:23:54]
assumptions as well and he kind of ran
[4:23:55]
some assumptions. But yeah, the bigger
[4:23:57]
that number is, the more traffic impact
[4:23:59]
it has, but the the bigger the financial
[4:24:01]
benefit strength is.
[4:24:02]
>> Okay.
[4:24:04]
Well, Brian, uh, Tom, Spencer, Shane,
[4:24:08]
David, thank you all for coming and
[4:24:10]
being part of this meeting. It was very
[4:24:11]
helpful to have us all together in a
[4:24:13]
public meeting and, uh, be able to
[4:24:16]
address some of these issues. So, I know
[4:24:18]
you're still willing to meet in smaller
[4:24:20]
groups as we as we have questions. That
[4:24:23]
invitation stands, but we appreciate
[4:24:25]
your time and help here today.
[4:24:28]
>> Thank you. Now, do we need to make
[4:24:30]
specific motions on anything or
[4:24:32]
>> counselors?
[4:24:34]
I just texted Brian, but I'll just say
[4:24:36]
it out loud. I was going to think uh
[4:24:38]
next steps possibly
[4:24:40]
gonna pitch this idea and I can workshop
[4:24:43]
it is that we'd come back to another
[4:24:45]
work meeting where perhaps Tanner who's
[4:24:48]
been leading in our office on the
[4:24:50]
analysis of all the documents best has
[4:24:52]
sent and then Brian and then Bill from
[4:24:55]
administration as well or Bill or
[4:24:57]
someone else from planning could lead
[4:24:59]
the discussion with Besper here as well
[4:25:01]
to try and get motions and clarification
[4:25:04]
on council
[4:25:05]
desires majority majority desires for
[4:25:07]
the development agreement and a purchase
[4:25:09]
agreement. I think a work meeting where
[4:25:12]
we do that after we get followup from
[4:25:14]
you on the questions the council just
[4:25:16]
had on all that additional information
[4:25:18]
that would be a very productive work
[4:25:20]
meeting. But I want to see if council if
[4:25:22]
you have feedback on that as far as our
[4:25:24]
next step in this process if you're okay
[4:25:26]
with that.
[4:25:27]
>> Yeah, just to piggyback on that. I I I
[4:25:30]
would agree. I think I mean what I've
[4:25:32]
seen so far is that again I think
[4:25:34]
there's still a sense there's a lot of
[4:25:35]
unknowns and I always hesitate to try to
[4:25:38]
push you for decisions when you still
[4:25:40]
have questions. One because it's not
[4:25:43]
fair and two because you won't do it.
[4:25:45]
[laughter] And so so uh I think that's I
[4:25:48]
think that's probably wise. I think one
[4:25:50]
of the things that we can probably do
[4:25:51]
internally and I'd like to coordinate
[4:25:53]
this with Malia and and Tanner but I
[4:25:55]
think we can probably try to even before
[4:25:58]
such a work session try to send you
[4:26:01]
lists of things that we have compiled
[4:26:04]
from your comments to say okay I heard
[4:26:06]
only heard this from one person but does
[4:26:08]
it does everybody agree with it and and
[4:26:11]
it and they just didn't say that because
[4:26:12]
it was already said or and try to try to
[4:26:15]
get some of that stuff kind of worked
[4:26:16]
out even before we get to such a late
[4:26:18]
session. Okay,
[4:26:19]
>> Brian, I had a question for you.
[4:26:20]
Something that might be helpful is I I
[4:26:24]
really appreciate the flexibility and
[4:26:26]
some of the recent changes to the
[4:26:27]
difference or sorry the the uh
[4:26:30]
development agreement with the different
[4:26:31]
gates and I think we talked previously
[4:26:33]
that they're discretionary on the
[4:26:35]
council. I think it'd be helpful from
[4:26:38]
probably you're the right person to give
[4:26:39]
us guidance on what are the questions
[4:26:41]
and concerns that are appropriate to
[4:26:44]
seek um answers to and and and if
[4:26:48]
they're determining factors for us at
[4:26:50]
the vote for that versus ones which are
[4:26:52]
fair and appropriate to hold off until
[4:26:54]
after that stage gate.
[4:26:56]
>> Okay.
[4:26:56]
>> Does that make sense?
[4:26:59]
any guidance would be just helpful
[4:27:01]
because like there there may be some
[4:27:02]
things where because again we want to
[4:27:04]
always it's very important to me
[4:27:05]
personally that we treat every proposal
[4:27:08]
and development uh aspiration with
[4:27:11]
fairness and there may be things where
[4:27:13]
if we don't get our head around by the
[4:27:16]
council it may just be the advice like
[4:27:18]
the best practice just to vote one way
[4:27:19]
versus saying hey I actually think this
[4:27:21]
is reasonable to hold on and if you say
[4:27:23]
no later that is fair
[4:27:25]
>> right right and that I mean I think
[4:27:27]
where I'm what I'm hearing from I
[4:27:29]
understand it correctly is a lot of
[4:27:31]
where that gate framework came from
[4:27:33]
because I think it it became
[4:27:36]
obvious apparent even if I'm wrong to me
[4:27:39]
very early on that there's a lot of
[4:27:42]
information that you're wanting that
[4:27:43]
there's just no way to have
[4:27:45]
>> yeah and it's not fair to ask the
[4:27:47]
developer to provide it as them to take
[4:27:49]
on too much risk relative to where we
[4:27:51]
are in the process
[4:27:52]
>> and so the whole gate framework was was
[4:27:54]
originally conceived of the idea of
[4:27:57]
we're going to give you time to get that
[4:28:00]
information later and back out later.
[4:28:03]
And and one of the things that I have
[4:28:04]
said in another context is to the credit
[4:28:07]
of the developer, I've never seen a
[4:28:10]
project or a developer so willing to let
[4:28:13]
you have those outs, right? I mean, what
[4:28:16]
this this gate framework is unique not
[4:28:19]
just because uh it's not something that
[4:28:22]
people commonly do, but because it's not
[4:28:24]
something that most developers would be
[4:28:26]
willing to do. uh because it it defers
[4:28:29]
their their security and their shity
[4:28:31]
down the road so much. But I think it's
[4:28:35]
pro it may be the only way to get you
[4:28:37]
the information that you need by the
[4:28:38]
time you're in it in the way that you're
[4:28:41]
going to be feasibly able to get it if
[4:28:44]
that makes sense. So, but I'm happy to
[4:28:47]
>> just you have any thoughts on that?
[4:28:48]
>> Yeah. Share more about that.
[4:28:52]
>> All right, Becky will give you the last
[4:28:54]
word. So, we didn't ever talk about the
[4:28:57]
swap piece.
[4:28:59]
Um, it looks like it is like there's no
[4:29:02]
access to it. It looks like it's very
[4:29:04]
steep terrain. It looks like there is no
[4:29:06]
trails on it.
[4:29:09]
What is Yeah, it doesn't look like it's
[4:29:11]
a piece of property with value. Um,
[4:29:16]
that's what I'm thinking. Can we get
[4:29:17]
some staff analysis on that?
[4:29:19]
>> Okay. to see if maybe parks and wreck
[4:29:21]
can even see if it's even valuable
[4:29:24]
because if it's not valuable, what's the
[4:29:25]
point in having it?
[4:29:27]
>> Okay. Thank you, Becky. All right. Thank
[4:29:30]
you again, Brian and team for your help
[4:29:32]
here today and we'll adjourn this
[4:29:35]
meeting.
[4:29:35]
>> Thank you.
[4:29:36]
>> Well,
[4:29:38]
yes.
[4:29:40]
>> So, first of all, I think we need to
[4:29:42]
announce that the last item has been
[4:29:45]
>> Okay.
[4:29:47]
>> Oh, wait. No, we actually need to that
[4:29:50]
we actually need to make have a motion
[4:29:52]
to continue the last item because it is
[4:29:55]
it's listed on your chair notes as being
[4:29:57]
both an RDA and a city as an RDA item,
[4:30:00]
but it it is both a an RDA and a city
[4:30:03]
item. So, we don't need to do the recess
[4:30:06]
and reconvening thing. The last item on
[4:30:08]
the agenda is about the Walmart deal
[4:30:10]
because we don't have some of those
[4:30:11]
agreements uh yet for you. I suggest
[4:30:15]
that we move to continue it and the
[4:30:17]
night
[4:30:19]
>> agenda items out until we have those.
[4:30:23]
>> Okay. But we don't need to convene RDA
[4:30:25]
to do that. Okay. So, I'm looking for a
[4:30:28]
motion to continue that item.
[4:30:31]
>> Yep. Make a motion that we continue that
[4:30:32]
last item
[4:30:34]
>> and the related evening meeting items.
[4:30:39]
>> Okay,
[4:30:39]
>> I'll second that.
[4:30:40]
>> A motion by councelor Hoben, second by
[4:30:43]
councelor Bogden. Um,
[4:30:47]
so we'll take a vote. Councelor Bogden.
[4:30:49]
>> Yes.
[4:30:50]
>> Councelor Hoben.
[4:30:51]
>> You just don't care about discussion, do
[4:30:52]
you?
[4:30:53]
>> Yes. [laughter]
[4:30:55]
>> He's He's rusty. He's
[4:30:58]
>> councelor Whitlock.
[4:30:59]
>> Yes.
[4:30:59]
>> Councelor G. Yes. Councelor Christensen.
[4:31:04]
>> Yes.
[4:31:04]
>> Councelor McKay.
[4:31:06]
>> Yes.
[4:31:08]
>> And councelor Rachel Whipple.
[4:31:11]
>> Yes.
[4:31:12]
>> Okay. Perfect. And then Shar the LA or
[4:31:15]
acting chair. Uh the um the last um item
[4:31:20]
is there has been a request for a work
[4:31:22]
session for a closed meeting. There's
[4:31:24]
actually two items to be discussed
[4:31:26]
regarding
[4:31:27]
reasonably litigation and sale of city
[4:31:31]
property. Both of those are appropriate
[4:31:33]
for closed meeting
[4:31:35]
for a motion to close.
[4:31:36]
>> Okay. Is there a motion to close the
[4:31:38]
meeting?
[4:31:38]
>> I move that we close the meeting and a
[4:31:40]
second. Second. All right. Sourcing
[4:31:44]
stuff today.
[4:31:45]
>> Any discussion?
[4:31:48]
>> I think I'll discuss because I wanted to
[4:31:50]
stay here longer.
[4:31:52]
>> Okay. Uh, councelor Hoben,
[4:31:54]
>> yes.
[4:31:54]
>> Councelor Whitlock,
[4:31:55]
>> yes.
[4:31:55]
>> Councelor Garrett, yes. Councelor
[4:31:57]
Bogden,
[4:31:58]
>> yes.
[4:31:58]
>> Councelor McKay,
[4:32:02]
» yes.
[4:32:03]
>> Councelor Christensen,
[4:32:05]
>> yes.
[4:32:05]
>> Councelor Whipple,
[4:32:06]
>> yes. Just send me the link.
[4:32:09]
>> Now, now we'll dismiss for a closed
[4:32:11]
meeting.