I'd like to call to order the August 12th meeting of the Rally Planning Commission. My name is
[3:35]
Nicole Bennett, and I have the honor of serving as chair of the commission. I want to thank
[3:39]
my fellow commissioners for your trust. I'd like to welcome members of the public, city
[3:44]
staff, and those joining us virtually. Our work here is about building a rally that reflects
[3:49]
the needs, values, and hopes of all of our residents and that work deserves our best
[3:54]
focus and respect. A few quick reminders as we get started. Commissioners, please wait
[4:00]
to be recognized by the Chair before speaking. We will treat applicants, staff, the public
[4:05]
and each other with courtesy at all times. Healthy debate is welcome and differences
[4:10]
of opinion are part of the process, but let's keep our discussions on topic, constructive
[4:18]
and as my former pastor used to say, decent and in order. We each bring passion and
[4:24]
perspective to this table. My commitment as Chair is to make sure that energy moves
[4:29]
us forward to an informed recommendation for City Council. With that, let's get started.
[4:35]
We begin each meeting with an opportunity for members of the public to comment on items
[4:40]
not on the agenda. Is there anyone here this morning who would like to comment on an item
[4:44]
not on the agenda?
[4:47]
Seeing none, we'll move into the agenda. First, we have the consent
[4:51]
agenda, which includes approval of the June 24th meeting minutes. Does anyone have
[4:57]
any comments on the minutes?
[5:02]
I would just know there's a paper copy on the table for you. The attachment and the agenda
[5:07]
was in a draft form and so it may be helpful for you to look at the paper copy on the table.
[5:13]
Do
[5:27]
you want to have any, I know it's a quick review, but any comments on the minutes?
[5:33]
If not, I will entertain a motion. So moved. Motion to approve the minutes.
[5:39]
Do I have a second? Second.
[5:40]
have a motion on the second all in favor it's
[5:49]
unanimous thank you the minutes
[5:51]
are approved next we'll move to committee reports we have one item coming
[5:59]
out of our June 26 committee of the whole meeting rezoning Z1324 South New
[6:05]
Hope Road the committee voted this item out with no recommendation pending
[6:10]
additional conditions from the applicant I'll ask staff for an update
[6:14]
on this case.
[6:17]
Good morning commissioners. Erin Klinger planning and development here
[6:21]
to give an update on Z1324. As a refresher, the applicant is requesting to
[6:28]
rezone approximately seven and three-quarters acres from R6 and R10
[6:33]
to NX4CU. The deadline for action is August 26th. So the proposed
[6:41]
conditions for the site would again limit uses that would otherwise be
[6:45]
permitted in annex zoning on the portion of the property east of South New Hope
[6:50]
Road, prohibit buildings within 200 feet of residential properties in the
[6:54]
neighborhood to the northeast of the site, limit density to 150 dwelling units,
[6:59]
and limit square footage for non-residential space to 35,000. Revised
[7:05]
conditions that were submitted since the Committee of the Whole Meeting would
[7:08]
prohibit hookah bars or vape and tobacco shops. Promise construction of a
[7:14]
10-foot wide multi-use path from the new development to the Walnut Creek Greenway and state that
[7:20]
the portion of the property south of the existing City of Raleigh sewer easement will not contain
[7:25]
residential units.
[7:28]
Again, the requested zoning is inconsistent with the future land use map
[7:33]
designation of low-scale residential, which designates R2, R4, and R6 is the most
[7:38]
appropriate zoning districts for this land use category, but it does envision a range
[7:43]
of housing types. While the proposed zoning would permit the housing types described in
[7:48]
this land use designation, it does so at a scale that better aligns with the neighborhood
[7:53]
mixed use category. The request is consistent with the comprehensive
[7:58]
plan. It supports policies and vision themes encouraging compact development of variety
[8:03]
of housing types, infill development, and open space preservation. It also aligns with
[8:09]
goals for increasing housing supply and supporting neighborhood serving retail.
[8:14]
On the other hand, as mentioned on the last side, the request is inconsistent with the
[8:18]
Futureland use map.
[8:22]
The request aligns with the policy shown here related to infill development, diversifying
[8:28]
housing options and preserving open space.
[8:31]
It also supports broader goals related to housing availability and access to neighborhood
[8:35]
scale commercial uses.
[8:38]
As you can see here, the revised conditions have added policy PR 3.13 greenway-oriented
[8:45]
development to the list of policies with which the request is consistent.
[8:51]
Inconsistent policies include those shown here.
[8:54]
These have not changed from the last meeting.
[8:58]
There are no outstanding issues with the request.
[9:01]
Again, the deadline for action is August 26th, which is also when the next meeting
[9:05]
is.
[9:07]
The request would require an amendment to the future land use map.
[9:11]
Approval would amend the map from low-scale residential to neighborhood mixed use.
[9:17]
And again, if the rezoning is approved, it would amend the future land use map.
[9:25]
Thank you.
[9:26]
We've received a full presentation from the applicant and heard from members of the public at the committee meeting.
[9:33]
Are there members of the public who wish to speak on this item?
[9:37]
Okay
[9:42]
I see the applicant. I'll grant without objection five minutes to each
[9:48]
slide.
[9:55]
Good morning Chair Bennett and members of the Planning Commission
[9:58]
worth mills with Longleaf partners here on behalf of Go Long Holdings LLC who
[10:05]
is the property owner and the rezoning applicant. When this case was at
[10:10]
Committee of the Whole there were a handful of questions specifically with
[10:16]
with regard to our zoning conditions and what we were going to be offering in the interim
[10:23]
between the Committee of the Whole meeting and this Planning Commission meeting.
[10:28]
For one, we have reworked condition two, which is the prohibition on hookah bars and vape
[10:35]
or tobacco shops to make sure that it is clearly defined and that the condition
[10:40]
does not prohibit other retail uses like a gas station or a convenience store from selling
[10:47]
those products, but making sure that we're keeping a specific hookah bar or vape tobacco
[10:53]
shop out of this site.
[10:55]
We have also included the condition to connect this development to the Walnut Creek Greenway
[11:02]
Trail with a 10-foot wide multi-use path.
[11:04]
and we have offered a condition that requires all of the land south of the
[11:11]
existing city of Raleigh sewer easement to be set aside for commercial space
[11:16]
which is a big point of contention for a lot of cases in Southeast Raleigh that
[11:23]
offer commercial uses but don't actually put those uses into practice so we
[11:29]
want to make sure that we are setting aside land for commercial uses that
[11:34]
will benefit this community as well as the surrounding neighborhoods. While this rezoning
[11:43]
is inconsistent with the future land use map, it is consistent with the comprehensive plan
[11:47]
overall and given the constraints that are on the property today with the Duke Energy
[11:56]
Transmission Line easement as well as that City of Raleigh Sewer easement, we think
[12:00]
that the highest and best use of this property is for multifamily with
[12:04]
commercial uses on that southern side. Having the ability to connect to the
[12:09]
greenway offers folks additional ways to access the site. We have access off of
[12:15]
South New Hope Road through a right in right out and we'll also be extending
[12:21]
Maybrook Drive to open up that piece of the street as public right of way
[12:25]
which again not only benefits this site but also benefits the
[12:30]
neighborhoods to our east. Myself and Peter Knossin are here to answer any
[12:35]
questions. Thank you for the time this morning and we appreciate your
[12:39]
consideration. Thank you. Thank you, Mr. Mills. Is there anyone else here who
[12:43]
wishes to speak in support of this case?
[12:49]
Seeing none, we'll turn to the
[12:51]
opposition. Is there anyone here who wishes to speak in opposition?
[12:57]
Okay,
[12:58]
I'll bring it back to the table then. Commissioners, do you have any
[13:00]
any questions or comments?
[13:06]
Commissioner McCoy.
[13:08]
The last time that you all came to the Committee of the Whole, we discussed making sure that
[13:14]
a good amount of residents knew about this project. Have you all done any extra outreach
[13:18]
in July to make sure that residents knew about it who didn't know?
[13:22]
We did not. We held two neighborhood meetings and have kept those attendees who are those
[13:28]
Those who attended and who sent us email addresses, we've been in communication with those folks
[13:35]
throughout the rezoning process to give them updates on new conditions and to answer general
[13:43]
questions that they've had throughout the process.
[13:45]
But we did not hold any new neighborhood meetings just given the fact that the first two neighborhood
[13:51]
meetings were fairly positive and people were on board with bringing new commercial
[13:57]
uses to the site. Do you have an idea of what commercial I heard also in the
[14:03]
committee of the whole and what you said now that it's a prohibition on vape
[14:07]
shops and things like that but do you have an idea of what type of commercial
[14:10]
use you want this space to be? Yeah there were so in talking with the
[14:14]
applicant and the property owner they envisioned either some sort of office
[14:19]
use or some sort of restaurant maybe a combination of the two like fast
[14:25]
casual restaurants, but no specific tenants or mix of uses have been sort of selected at
[14:34]
this point.
[14:37]
Any other questions or comments?
[14:41]
If not, then I will entertain a motion,
[14:45]
Commissioner Fox.
[14:48]
In regards to case Z1324, I moved to recommend adoption of the proposed consistency statement
[14:55]
dated August 12, 2025, contained in the Agenda Materials and recommended
[15:00]
So includes an amendment to the future land use map to the extent described in the adopted consistency statement.
[15:06]
We have a motion. Do I have a second?
[15:09]
Commissioner Miller has seconded the motion. Any other discussion?
[15:14]
If not, all in favor?
[15:19]
All opposed?
[15:22]
Thank you. That is how many of us are there?
[15:27]
Eight to one.
[15:29]
Thank you very much.
[15:32]
Commissioner Omakaiye, would you like to state for the record your opposition to the case?
[15:39]
I live in this community, like literally this project is up the street for me and around the corner.
[15:46]
It's a two-lane road, same thing I said in Committee of the Whole, that this is going to increase traffic in that area.
[15:52]
Rock Wari already has substantial traffic, especially going past New Hope.
[15:57]
That's going to increase that traffic.
[15:59]
my mom lives literally right there on the map and she didn't get any
[16:04]
notification or information about this rezoning. I know that there is a little
[16:08]
tiny yard sign on New Hope Road when you pass it but there's no even sidewalk or
[16:14]
place for somebody to pull over to even scan that sign. So I don't think that
[16:17]
the community was well and held and aware of this project. We had
[16:22]
community members come to the community hold against this project.
[16:28]
Yeah, so those are my reasons.
[16:31]
Okay, thank you.
[16:34]
Next we'll move on to old business and our first item is Z51-24 Fairbanks Road.
[16:44]
This case was deferred from our June 24th meeting to allow the applicant to address
[16:49]
a boundary issue. I'll ask staff to provide an update.
[16:52]
Good
[17:03]
morning, Erin Klinger again here to give an update on Z51-24.
[17:11]
The request has been updated because as the boundary, previous boundary line issue has
[17:17]
been resolved, the request is now to rezone from NX3CU and R10CU to NX3CU.
[17:26]
The deadline for action is August 28th.
[17:31]
Again, as a reminder, the proposed conditions would prohibit several uses that would otherwise
[17:36]
be allowed in NX3CU zoning, limit density to no more than 60 dwelling units, and limit
[17:43]
off square footage for office and retail to use 65,000 square feet each.
[17:48]
Other than the current zoning having been updated to reflect the corrected parcel
[17:52]
boundaries, the case has not changed since it was last heard before the commission.
[17:58]
The requested zoning is consistent with the neighborhood mixed-use land designation and it is consistent with the comprehensive plan overall.
[18:09]
Here is a list of policies with which the request is consistent and no policies were found with which it is inconsistent.
[18:20]
Again the previous boundary line issue has been resolved.
[18:24]
There are no additional outstanding issues with the request.
[18:27]
Again, the deadline for action is August 28th and the next meeting is on August 26th.
[18:37]
Thank you for the update.
[18:39]
Are there any members of the public who wish to speak either in support or opposition of
[18:44]
this case?
[18:51]
Without objection, I will give five minutes to each side.
[18:54]
I was just going to say, Chair Bennett, Toby Coleman here on behalf of the applicants
[18:58]
were available for questions if there are any questions.
[19:04]
Otherwise, we're happy to sit on down.
[19:06]
Thank you. Bringing it back to the table. Are there any questions or comments from the commissioners?
[19:14]
If not, I will entertain a motion.
[19:18]
Motion to approve this case and adopt the proposed Consistency C statement contained in the agenda materials.
[19:24]
Thank you, Commissioner Miller. Do I have a second?
[19:27]
Thank you, Commissioner Burnett. Any further discussion?
[19:33]
Okay, we have a motion to approve. All those in favor?
[19:37]
All opposed?
[19:40]
That is 9-0.
[19:42]
Thank you very much. Our next old business item is Z10-25-8125 Leesville Road. We received
[19:53]
a full presentation from staff and the applicant and received public comment at our June 24th
[19:58]
meeting. The case was deferred to allow the applicant to consider additional conditions.
[20:03]
I'll ask staff for a brief update.
[20:10]
Good morning. Meet your chef for Adirond here
[20:12]
We're writing an update on Z1025.
[20:17]
As a reminder, the request is to rezone just under three acres of land from R4 to R10,
[20:22]
CU, located at 8125 Leeswell Road.
[20:25]
Since your last meeting, the applicant has submitted five new conditions, which I'll
[20:31]
touch on today, and then your deadline for action is August 23rd.
[20:34]
Just another general overview of where the site is located.
[20:39]
Conditions 1 through 4 have remained the same since your last PC meeting.
[20:45]
The first condition is prohibiting a number of uses, otherwise allowed in R10, prohibiting
[20:50]
the apartment building type, and then conditions 3 and 4 increase the side yard and rear yard
[20:55]
setbacks to 10 and 30 feet along the southern and western boundaries of the site, and then
[21:00]
also creating a six foot or requiring the installation of a six foot wall and tree
[21:06]
buffer along that same boundary, along the Ghostpony Trail sub.
[21:12]
And then conditions five through nine will be new to you all.
[21:16]
I will say that these, there's a slight change between this and what's included in the agenda
[21:20]
materials because of these are the official signed conditions.
[21:24]
But condition number five exempts the site from block perimeter and dead-end treat requirements
[21:29]
and the substitute requirements.
[21:33]
Also requiring a minimum roof pitch of four and 12
[21:36]
and then also capping residential height at 40 feet.
[21:41]
And then as well as condition eight,
[21:43]
requiring the installation of a speed hump
[21:45]
either within the Ghostpony Trail right away
[21:47]
or an internal private drive aisle on the development site
[21:51]
should the development take access
[21:53]
from the Ghostpony Trail sub.
[21:55]
And then the final condition is requiring
[21:58]
hearing at least two of the following materials be included in future residential development
[22:03]
front facades. Again, the request is consistent with the comprehensive plan and consistent
[22:09]
with the future land use map designation of moderate-scale residential, a list of consistent
[22:14]
policies that have remained the same since your last meeting, and only two inconsistent
[22:19]
policies were identified this week to fire service response time standards. And then
[22:24]
there are no outstanding issues for the case and your deadline for action is
[22:27]
August 23rd, which is before your next PC meeting.
[22:32]
Thank you for the update.
[22:34]
We received a full presentation from the applicant and public comment at our last meeting.
[22:40]
But could I see if there's anyone here who wishes to speak on this case?
[22:45]
I see Mr. Mills.
[22:47]
Can I see another?
[22:49]
Without objection, I'll grant five additional minutes to each side.
[22:56]
We'll start with the applicant and those in support.
[22:58]
Good
[23:05]
morning again commissioners, Worth Mills here on behalf of Vibes Fund LLC, the applicant.
[23:10]
I did want to go over the updated conditions that we've offered since our last meeting.
[23:18]
We did hold another virtual neighborhood meeting with neighbors on July 29th and shared these
[23:24]
conditions.
[23:25]
So first we've extended the rear yard setback from the two adjacent single family homes
[23:30]
on Ghost Pony from 30 feet to 40 feet so that rear yard setback is now larger than the current
[23:37]
R4 zoning requires. We've exempted ourselves from the block perimeter requirements which
[23:42]
is consistent with the exception that we meet in section 8.3.2. We've effectively eliminated
[23:50]
flat roofs and rooftop living space and we have lowered maximum building height to
[23:57]
40 feet, both of those are intended to sort of create a more compatible development with
[24:04]
the Ghostpony Trail neighbors. We've required an installation of a speed hump along the
[24:09]
extension of Ghostpony Trail in conversations with City of Raleigh Transportation. It's
[24:15]
become pretty clear that our access to Leesville Road will be from Ghostpony to Country
[24:21]
trail to Leesville instead of going north through that potential future development at
[24:27]
8215 Leesville Road.
[24:30]
So knowing that, we wanted to offer a condition for traffic calming.
[24:34]
And we've required each home to include at least two building materials into the front
[24:39]
facade, which is similar to the architectural designs of those homes along Ghostpony
[24:43]
Trail.
[24:44]
There are two conditions that, by my error, did not make it into the updated zoning
[24:50]
conditions. One is a maximum development of 22 units and the second is a condition to
[24:59]
require no more than six individual town home units within a town home building to help
[25:06]
with the building massing. I did just want to let the Planning Commission know that
[25:11]
we would intend to hold this case at City Council when it gets there to offer those
[25:15]
conditions before the public hearing, and that is 100 percent my mistake.
[25:21]
I also wanted to show a concept plan that Gary Walston at B&K put together.
[25:29]
This concept plan shows 17 townhome units with the extension of Ghostpony Trail as
[25:37]
a private drive looping around the site and then exiting back south.
[25:42]
each town home would have a garage and a driveway and there are 10 additional
[25:47]
guest parking spaces in the center. We are showing two stormwater control
[25:53]
devices on the western boundary of the site. Those would drain into the stream
[25:59]
that's located on that larger 8215 Leesville Road site. Again the cases
[26:05]
consistent with the future land use map, the comprehensive plan, we've
[26:10]
We've offered conditions to increase compatibility with our neighbors along Ghostpony Trail,
[26:17]
but happy to answer any questions that you have this morning, and we appreciate your
[26:20]
time.
[26:21]
Thank you, Mr. Mills.
[26:23]
Is there anyone else here who wishes to speak in support of the case?
[26:27]
If not, then we will turn to the opposition.
[26:29]
You have five minutes as well.
[26:33]
Please state your name for the record.
[26:55]
Hi, good morning.
[26:56]
My name is Eric Cungate.
[26:57]
I'm the Vice President of the HOA for Westlake Country Trail.
[26:59]
I want to thank you all for allowing us to speak this morning.
[27:03]
I'm here to summarize our safety concerns for this rezoning and why we hope you will vote against it today.
[27:09]
I want to start by saying we're not against development.
[27:12]
We understand that Raleigh has a housing issue and we're not against development of this property.
[27:16]
We bought into this neighborhood.
[27:18]
We understood that we were buying into an early phase of the neighborhood that would be growing into a larger neighborhood
[27:23]
that would be built cohesively with similar looking homes with systems that work together.
[27:27]
that was approved by the city in 2017 and you can see here this is the next
[27:34]
phase of the property this is my home right here so this next property was
[27:37]
supposed to be six homes which we were actually kind of excited about so now
[27:41]
there's going to be townhomes there just a few of our to summarize of our
[27:46]
concerns is adding a town home community in between two sections of
[27:50]
the neighborhood will create disjointed developments with limited
[27:52]
ability to solve future issues cohesively there's actually a third
[27:56]
property that's going to be part of this land area as well, so you'll have three separate
[28:00]
neighborhoods that aren't really speaking and working together to make sure there's
[28:05]
no issues down the road.
[28:06]
Stormwater is another concern.
[28:08]
The current infrastructure on Ghostpony Trail simply cannot absorb any more runoff from
[28:12]
this development, especially not in R10.
[28:15]
The property is uphill, and all the water will be pushed down into a creek which
[28:19]
currently runs through the back of our properties and the lower part of our community.
[28:23]
It already crests the banks of the creek when we get heavy rain.
[28:28]
There's also no clear plan as to how the property stormwater systems will work together
[28:32]
with the new Winters Hollow, which is the other property, as well as our property.
[28:36]
So you're looking at three different storm systems that are not working together.
[28:40]
The couple other of our final concerns is the investor doesn't really have any details
[28:46]
for price points, number of bedrooms, floor plans, et cetera, because we believe that
[28:50]
he is not a developer.
[28:50]
developer. We suspect he is planning to sell the property once re-zoned to another developer,
[28:56]
which again leaves so many different questions that are still out there. Also, the possibility
[29:01]
of renters. You know, sometimes renters don't care about the neighborhood quite as much
[29:05]
as someone who might own the home. And some of their back decks will be backing up
[29:08]
right up to my house. And our property, which we are worried about renters having
[29:13]
more parties there because when I was in a town home, I attended the party on
[29:17]
back decks too. So that's one of our concerns.
[29:21]
Adrienne Turner, as Commissioner Bennett noted during the last meeting traffic in the Leesville
[29:28]
area is a huge concern. This is a three school campus that serves more than 4,000 students
[29:35]
all on two lane roads. We have a street with a lot of blind turns. It is uphill.
[29:42]
hill. It is not flat. It's hard to tell from these pictures. This is an uphill neighborhood.
[29:48]
This is also a neighborhood yield street. So parking is a huge concern. We have asked for
[29:54]
a condition of two car garages.
[30:00]
Or covenants. This street cannot handle the parking that will happen from all of these town
[30:06]
homes.
[30:09]
Hi, Marianne Hungate. And final minute, I'm going to just show you some photos so that
[30:16]
you can see some of the impact of the stormwater issues that we're having today. And nothing
[30:22]
has been cleared yet. There will be not one, but two properties bordering our street.
[30:27]
And the solution is to use a small stream.
[30:35]
The wrong way.
[30:37]
I'm just going to show you what that stream looks like today after a rain event.
[30:42]
And as everyone knows, these rain events are becoming more and more frequent as time goes by.
[30:48]
And this is the solution that was just presented for the stormwater.
[30:52]
Is this little tiny creek for, again, not one, but two proposed developments?
[30:56]
and we do not consider this to be a solution, we are concerned that it will run down the
[31:02]
street and flood our properties.
[31:09]
Kyle Smith, I live on Ghostpony Trail.
[31:12]
We have a couple additional slides showing traffic concerns, which largely speak for
[31:17]
themselves.
[31:18]
It's heavily trafficked, low visibility, high frequency of accidents, and so increasing
[31:23]
density of traffic with no plan to mitigate the safety concerns is dangerous and unreasonable.
[31:30]
And I think I'll just wrap up by saying much has been made of the fact that the future
[31:34]
land use map contemplates that this would eventually be R10 zoning.
[31:38]
But what's lost in that discussion is the fact that the current zoning map and the
[31:42]
future land use map contemplate that our neighborhood and the two adjoining parcels
[31:46]
will share a zoning.
[31:48]
And so eventually, yes, these three parcels together may be re-zoned, but it's not
[31:53]
reasonable to kind of do a piecemeal and abandon the original plan for a cohesive community
[32:00]
of 30 to 35 neighborhoods just for density for density's sake. So thank you for your
[32:05]
consideration and absent any questions. We'll turn it back to the commission.
[32:09]
Thank you.
[32:12]
Okay, commissioners, we'll bring it back to the table for your questions
[32:16]
and comments.
[32:20]
Commissioner Burnett.
[32:22]
For the applicant, my question is, I mean, they've made a really compelling case
[32:26]
regarding just like the stormwater runoff.
[32:28]
It seems like it's going to be a really big problem.
[32:30]
I was just looking at it on Google Maps,
[32:32]
and I actually used to go to Leesville.
[32:34]
So I remember how far that slopes downward.
[32:37]
You have any information from the site survey
[32:39]
about how far that slopes down, et cetera, et cetera?
[32:59]
Yeah, I'm going to have David Blevins, one of our engineers
[33:02]
with BNK, walk through the stormwater.
[33:09]
Good morning.
[33:10]
My name is David Blevins.
[33:12]
I'm an engineer with Bass, Nixon, Kennedy, 6310 Chapel Hill Road, Raleigh, 27607.
[33:22]
I just did a, of course I did a brief analysis of the stormwater, but the topographic condition
[33:31]
of this property is such that the runoff naturally goes to the back of the property
[33:38]
from Leesville Road to the back.
[33:40]
back. We can't change that. That's just the way the property was made. And of course the
[33:46]
stream is at the back. And so I looked at the, I did just an analysis of the impervious
[33:54]
area of the layout that Gary did. And then I did an analysis, just looked at the impervious
[34:04]
area of a six-lot residential development, just similar to what was shown and put 38%
[34:18]
impervious for, which is the allowable for single family R4.
[34:24]
And there was about 1,700 square feet more impervious area for the townhomes.
[34:32]
So in the world of stormwater for us, that's really a very, very manageable number.
[34:40]
It really doesn't, it doesn't, it's something that we can easily manage, so, but yeah, that's,
[34:51]
our, we will not be running any stormwater into there, into ghost pony trails,
[35:01]
existing stormwater system at all that will be impacting there. All of our
[35:07]
stormwater has to stand alone in whatever stormwater devices we create to
[35:12]
manage both water quality and quantity.
[35:19]
Thank you.
[35:22]
Commissioner Cochran. I
[35:24]
actually have another question about the stormwater. In your analysis you said
[35:28]
Did you base it on the 17 units shown, but you're asking for a condition for 22 units?
[35:36]
So that 17% increases based on 17 units, not 22, correct?
[35:42]
Yes, correct.
[35:47]
Commissioner Atwell.
[35:49]
I was wondering if we could get Raleigh Stormwater to comment on the difference in regulations
[35:53]
that would be required for stormwater control between the two requested zonings and the
[35:58]
potential impact to the system.
[36:00]
Good
[36:10]
morning, Sally Hoey, Raleigh Stormwater. Given the size of this parcel, the zoning
[36:18]
does not matter.
[36:21]
Because this parcel is greater than an acre, the full stormwater requirements
[36:28]
apply, so there is no prescribed amount of impervious area. They just have to provide
[36:35]
the treatment associated with the impervious area. Does that address your
[36:40]
question? I think it does and if you could refresh my memory the current rules
[36:44]
require that the development show no exceed, no excess, no increase in the
[36:52]
amount of runoff from the site from current conditions. That's correct.
[36:56]
There's two main components of the stormwater regulation. One is aimed at
[37:00]
the quantity of water and that looks at the two and ten year design storms which is like
[37:08]
the tenure is about I think 5.7 inches of rainfall and so it looks at the rate of flow coming
[37:18]
off the site, the rate cannot increase. So if there was a pipe that was able to convey
[37:23]
that flow under existing conditions or a stream that was able to contain it then it would
[37:27]
continue to be able to contain it. Then the second component is about water
[37:31]
quality and specifically because of the impairments in the new watershed for
[37:36]
nutrients it looks at the amount of nitrogen so they would have to do some
[37:42]
sort of treatment for nitrogen it would depend on the density of the site
[37:46]
whether they had to provide on-site controls for that or could do by
[37:53]
mitigation credits.
[37:56]
And one follow-up, I realize this is out of your purview. I
[38:01]
understand the city is taking over flood mapping responsibilities from FEMA and
[38:06]
will be doing their own mapping on a more detailed scale. The site currently
[38:10]
is not part of a regulatory floodplain nor is any part of Ghostpony Trail but
[38:14]
there are flood prone soils located along the creek. Do we know if the
[38:19]
city plans to expand the flood mapping modeling to this site or is there
[38:24]
somewhere we can look for that? We are planning to expand flood plan mapping
[38:29]
but actually that I can't give you a timeline on but in the changes we made
[38:35]
to the UDO last fall there's a requirement that if there's flood
[38:43]
soils or even if there's not flood soils, if there's a certain acreage of drainage area to a stream,
[38:51]
the flood boundaries have to be mapped. So five acres, if there's flood soils, 25 acres, if there's
[38:59]
not flood soils, requires some type of flood mapping. So it appears that would be required.
[39:04]
I haven't calculated the drainage area, but there would likely be something done in this
[39:09]
project. Thank you very much. Mr. Miller. Thank you and Sally just to double
[39:16]
check that I heard you correctly. Did you say that whether regardless whether
[39:20]
the development occurred under the current zoning or the proposed zoning
[39:24]
that the stormwater controls with respect to impervious service would be
[39:29]
the same either way? That's correct. It's only for parcels less than an
[39:34]
acre where the the limits in the UDO apply so because this park is full is
[39:40]
over an acre it it those limits do not apply thank you
[39:46]
Commissioner McCoy I have a question to the gentleman that came up to talk
[39:51]
about stormwater I know that I mean we've heard definitely that that's
[39:57]
like one of the major issues of this site and I do hear you saying we'll
[40:01]
do what we have to do but I'm wondering what specifically you have in mind to do
[40:06]
to maintain the stormwater and then to also make sure that when future
[40:10]
development comes it is able to be adaptable. Well we as Sally mentioned
[40:17]
we'll have to meet all the requirements that Raleigh has for the two and two
[40:22]
and ten year storms. Whenever you do stormwater detention for the ten year
[40:27]
storm, you're actually doing the tension for a good portion of the 25-year
[40:35]
storm, maybe 30 percent or so. So we won't know exactly what type of device
[40:46]
we're going to use, but we will have to use a combination of something that
[40:50]
would be water quality, like a bioretention basin. And then on top of that, we might
[40:58]
store use storage for flooding to store some water on top of that. And so, you know, on
[41:11]
a small site like this, I've done a lot of commercial sites. They're fairly simple
[41:17]
to do and I think in the amount of area that we had left shown on Gary's sketch there,
[41:25]
we had ample area to provide storage, you know, room for both devices, types of devices.
[41:37]
And are you all intending to use the creek that they're mentioning as a measure of easing
[41:43]
stormwater distribution?
[41:44]
Well, that's where the storm water is going now.
[41:48]
We don't have any other place to take it.
[41:59]
The topographic configuration of the property takes all of the drainage to the back of the property.
[42:08]
If we took it somewhere else, we would, if there was another opportunity to take it somewhere
[42:15]
else, we would actually be violating the rules by diverting it from where it's naturally
[42:21]
going to where it's not naturally going.
[42:26]
So we have to take it to the area where it's naturally going.
[42:30]
Do you plan on enhancing the creek to be able to, because I mean, I see it's called
[42:37]
the creek but you know it's kind of tiny do you plan on enhancing that in any way
[42:41]
to be able to maintain extra storm water drain off? Well the creek is not
[42:46]
actually on our property so we don't have any plans to do anything to the
[42:51]
creek because we don't have access to the property there is a development the
[42:55]
winners hollow is a subdivision that is in the process now it is one that is
[43:03]
a subdivision that will not be before the planning commission, it's just a staff-approved
[43:10]
subdivision and they have some plans for stormwater on their property as well, but we can't get
[43:23]
back there and do anything with the creek because it's not our property.
[43:27]
Thank you.
[43:27]
You're welcome.
[43:28]
Commissioner Fox.
[43:28]
May I follow up on that just really quickly?
[43:31]
So if I was understanding the sorts of back-to-the-property, you have either retention or detention proposed.
[43:39]
You have a stormwater device proposed on the property, which would slow flow to the stream.
[43:47]
That's correct?
[43:48]
Okay.
[43:48]
Thank you.
[43:49]
So, the intent of that is likely to create a condition where the stream can adequately
[44:00]
convey that water?
[44:02]
Is that correct?
[44:02]
Well, correct.
[44:04]
Okay.
[44:04]
For the design storms that Sally mentioned, for the two and ten-year storms, and then
[44:11]
for a good portion of the 25-year-old.
[44:13]
Thank you.
[44:14]
That helps.
[44:17]
The gray shaded areas on the screen are those for stormwater retention.
[44:23]
Thank you.
[44:28]
The green is the amenity area.
[44:32]
That's required for a town home.
[44:33]
Are the two gray areas?
[44:45]
We're laughing up that we can't see.
[44:48]
We're all getting older.
[44:50]
It's not shaded very well.
[44:53]
Sally, could I ask you a question again, please?
[45:00]
Specifically addressing the concerns that we heard from the public. And one of them was that
[45:09]
there are going to be three different stormwater systems that aren't working together. Do you
[45:17]
share that concern or is there some sort of cumulative impact assessment that would need
[45:22]
to be done to ensure that they are in fact working together or is that not a concern?
[45:28]
I mean, I don't have a large concern because each development will be held to the standards.
[45:40]
I would see more of a concern from a, if I were a homeowner from an operation and maintenance
[45:46]
standpoint that if there's more stormwater control measures, there'd be more things
[45:52]
to maintain that sort of thing. But from the city standpoint in terms of the functionality,
[46:01]
I think it's possible for them to operate independently.
[46:06]
Okay. Thank you. Are there any other questions or comments about stormwater?
[46:14]
Okay. Commissioner
[46:16]
Atwell.
[46:16]
Thank you, Chair Bennet. I note that the property that contains the creek is owned
[46:20]
by the Church of Latter-day Saints as the city received any feedback or engagement from
[46:25]
the church?
[46:30]
That site is currently undergoing like subdivision insight plan review and then has like indicated
[46:38]
that they're applying for annexation currently.
[46:44]
So you're reaching for your mic?
[46:48]
Yes.
[46:48]
Thank you.
[46:52]
I acknowledge there are likely some stormwater concerns there.
[46:56]
I'm comfortable and confident that the code can actually handle that if it's
[47:03]
built to standard. The only inconsistency I'm actually finding when going through
[47:08]
the staff report is related to response times and I know we've had
[47:14]
that come up a number of times. I was wondering,
[47:19]
Bynum, could you remind me the study that, I believe, Fire Department was undergoing?
[47:27]
Sure.
[47:27]
So City Council saw the Fire Department Master Plan before the break, and that document prioritizes
[47:36]
some new stations.
[47:37]
I don't remember that there was one in this vicinity.
[47:40]
Okay.
[47:40]
Thank you.
[47:42]
But I would also note that, thank
[47:51]
you.
[47:53]
regarding traffic. So I did mention at the last meeting that all three of my
[47:59]
all three of my kids, both of my kids, I just got a ghost kid from somewhere, both
[48:04]
of my kids went to all three of the Leesville schools there so I've been
[48:10]
driving that area for many many years and I was actually on the community
[48:17]
task force that worked with the city to get grant funding to do the bike and
[48:24]
ped improvements that are on Country Trail and Pride Way after a student was
[48:30]
hit. So I'm aware of there's a lot of traffic. There was also a plan at some
[48:37]
point to widen Leesville and that stretch of Leesville was has not been
[48:44]
widen. I'm wondering if transportation staff can tell us is that in the queue to widen that
[48:53]
stretch of Leesville?
[49:02]
Good morning Planning Commission. Carter Robertson with transportation.
[49:06]
So Leesville was evaluated as part of the last bond in 2017 to be widened. It ultimately wasn't
[49:14]
selected at that time. It didn't rank as high as some of the others that were chosen.
[49:18]
right now there's no current plans to widen it that might be evaluated as
[49:24]
part of a future bond opportunity we do know there now that it is reaching
[49:29]
capacity as a two-lane road and the future destination would accommodate
[49:35]
for the current volume set of four lane okay but this project did not warrant
[49:42]
TIA is that correct? No ma'am. Okay. Commissioner Atwell. Could you comment on
[49:49]
the public engagement process for the Leesville Road widening project? Do you
[49:53]
remember what the outcome of that was? I'm not familiar. I wasn't at the city at
[49:58]
this time. Thank you.
[50:06]
I do recall many years ago when the entire stretch of
[50:10]
Leesville was being considered to be widened there was some
[50:15]
opposition from the Springdale neighborhood about widening in that particular area.
[50:21]
So I don't know this for a fact, but my guess is that part probably moved down in ranking
[50:28]
because there was an opposition for the other part of Leesville, which is near widened,
[50:32]
which is the part I live off of.
[50:37]
Any other questions or comments from commissioners?
[50:43]
If not, I will entertain a motion.
[50:47]
Commissioner Miller.
[50:49]
I wanted to address the applicant mentioned that there are two conditions that did not
[50:53]
make it into this case.
[50:56]
And I wanted to also address the conditions that were added and thank the applicant for
[51:00]
those conditions related to the speed humps and traffic calming.
[51:07]
And additionally, it seems that they went above and beyond what we typically see when
[51:13]
And you add townhouses to a residential development in terms of managing their appearance.
[51:20]
The two conditions that did not make it in, but the applicant intends to hold, again,
[51:25]
those two conditions were a maximum development of 22 units.
[51:29]
And then the other is to require no more than six individual townhomes per unit to
[51:34]
avoid to address massing.
[51:36]
Those two, while the developer is willing to offer them, likely to address concerns
[51:43]
from the neighbors. I don't see those as so critical to this case. I think it's still consistent
[51:47]
with the comprehensive plan without those two requirements that I'm comfortable making a motion
[51:52]
to recommend approval of this case and also recognize that two additional conditions will
[52:01]
be added before council. Thank you, Commissioner Miller. We have a motion to approve to have
[52:14]
second.
[52:18]
Commissioner O'Haver has seconded it. Do we have any additional discussion?
[52:23]
I would just like to follow up on Commissioner Miller's comments. I do appreciate the applicant
[52:29]
increasing the setback. I think that was one of my comments and anybody that attends these
[52:33]
meetings regularly know that as part of my focus is existing single family homes.
[52:38]
So I want to thank the applicant for that.
[52:40]
I appreciate the height max, number of units,
[52:43]
no more than six years again looking at the scale of the development.
[52:48]
I hear the stormwater concerns.
[52:50]
I'm looking at Google Maps.
[52:52]
There's a lot of asphalt out there, a lot of concrete out there in those
[52:56]
existing homes a lot.
[52:58]
Looking at the concept plan, I just don't see the applicant
[53:03]
must meet the city standards. I just don't see the storm water getting worse. I
[53:08]
just want to say I hear the neighbors concerns but knowing what I know about
[53:12]
storm water and looking at existing conditions I'm comfortable seconding and
[53:17]
approving this application. Thank you Commissioner Haver. Any other
[53:22]
discussion? All those in favor? All opposed. That's nine zero.
[53:33]
Thank you very
[53:34]
very much.
[53:36]
Moving on to new business,
[53:41]
we'll give the members of the public an opportunity
[53:44]
to get situated.
[53:57]
We have rezoning Z-1225 Peace and West Street. We'll turn to Mr. Clem for
[54:05]
a full presentation.
[54:09]
Good morning Planning Commission. Matthew
[54:11]
Clem, Raleigh Planning and Development. Here to present Z-1225 for your review today.
[54:17]
The request is to rezone 2.6 acres from industrial mix use for the 12-story height limit to downtown
[54:25]
mix use with a 30-story height limit, an urban general frontage, and zoning conditions.
[54:31]
Your deadline for action is October 11th.
[54:35]
Just a quick look at the zoning map here.
[54:39]
Doning in the area is predominantly industrial mix use, as the site is
[54:43]
zoned, and downtown mix use to the south, which is the burgundy color on the
[54:49]
screen. The northwest of the map is residential tin, including the Glenwood
[54:56]
Brooklyn Streetside Historic Overlay District. Along P Street there's
[55:01]
also some neighborhood mix use and commercial mix use as well.
[55:07]
An aerial
[55:08]
view of the site. You can see that the property fronts West Street MP streets highlighted in yellow.
[55:15]
It's adjacent to a 14 acre site that will be the home of Smoky Hollow Park.
[55:24]
So a new large future park in the area. Again, Glenwood Brooklyn to the west.
[55:30]
You can see Smoky Hollow to the south. Capitol Boulevard cuts the map in half as well. Also
[55:35]
to the east seaboard station. This is just a 3D view of the site, trying to highlight
[55:45]
the difference in topography along the property between the future city park and the site,
[55:56]
and also just a sense of what other buildings in the area are in terms of scale. So looking
[56:01]
Looking at the site, this is from P Street, some existing structures there, and this is
[56:07]
from West Street, two shots there.
[56:12]
The number of zoning conditions, the first prohibits high-intensity uses, they're listed
[56:17]
there.
[56:17]
The second is related to building height, and there is an associated exhibit that
[56:26]
is on our future slide.
[56:27]
but the site is broken into two zones. Zone one is limited to 240 feet or 25
[56:38]
stories. There's more detail on the exhibit slide. Zone two is limited to
[56:45]
360 feet. Each of those zones have an additional 20 feet of building height
[56:51]
depending on what the primary street is determined to be during site plan.
[56:56]
And we can talk a little bit about that if there are questions.
[57:01]
Condition number three addresses parking deck screening, condition four, five, and six are
[57:10]
related to development of the property's edge to the east where the location of Smoky
[57:17]
Hollow Park is planned.
[57:19]
So there's a condition that prohibits surface parking between the park and the property,
[57:24]
property, the future parking the property. There's a zoning condition that requires pedestrian
[57:29]
connectivity from the rezoning site to that property and requires a urban plaza to be
[57:38]
built as an amenity area adjacent to the park there as well. Office uses are limited
[57:44]
to 500,000 square feet in any development. And then the final condition is a contribution
[57:52]
to the city's affordable housing fund prior to the issuance of the fifth
[57:58]
hundred unit for certificate of occupancy. So what that means is if the
[58:03]
property is developed with 499 residential units no contribution to
[58:09]
the affordable housing fund is made, if 500 or more are developed on the site
[58:14]
then a $1.2 million contribution is made. So there's not a guarantee that
[58:20]
the money would be given to the city for affordable housing unless more than 499 units are built.
[58:28]
So this is the zoning condition exhibit regarding building height.
[58:35]
So this is the property of P Street is here, West Street is here.
[58:41]
And this is where the split is.
[58:43]
So for zone one on the northern portion of the rezoning site, building height is limited
[58:49]
it to 25 stories or limited to 240 feet in height. If at-site plan, P Street is determined
[59:00]
to be the primary street, the 240 feet building height limit is actually 260 feet. Similarly
[59:08]
for zone 2 towards the south, if the exhibit limits building height to 360 feet, but
[59:17]
And if P Street is determined to be the primary street, it's actually 380 feet.
[59:23]
So there's some variation in development outcomes based on the zoning exhibit.
[59:29]
Just to try to map where that line is on the aerial view of the site, it's roughly located
[59:36]
in this.
[59:37]
This is not a surveyed map, but generally in that location.
[59:43]
Looking at the proposed development intensity based on existing zoning and proposed zoning,
[59:49]
You can see that the estimated residential yield increases...
[1:00:00]
The office square footage goes down based on the zoning condition. So less office could be
[1:00:05]
built under the proposed zoning than the existing zoning. And that has implications to traffic
[1:00:12]
counts during AM and PM peak hours. So the office use is one of the higher trip-generating uses.
[1:00:22]
So by reducing office below this threshold, the intent is that it would produce fewer
[1:00:27]
trips compared to the existing zoning. Retail slightly goes up. And then of course, 92,000
[1:00:34]
square feet are estimated to be able to be delivered under the existing zoning. The future
[1:00:39]
zoning takes all industrial uses out of a development option. So by going from the
[1:00:49]
industrial mixed use to the downtown mixed use, light industrial uses are not permitted
[1:00:54]
on the site. So in terms of transportation and energy analysis, the site has a higher
[1:01:00]
walk score, transit score, and bike score in the city average. The site is about a 20-minute
[1:01:07]
walk from this room. So if you're living there, you can walk here in 20 minutes or an 8-minute
[1:01:13]
bike ride. The site is served by the R line currently that is a frequent transit
[1:01:19]
service that has a 15-minute frequency. It can also bring you downtown or to your work
[1:01:27]
or wherever you're going. Higher transportation cost index than average. So what that means
[1:01:33]
is folks who live in areas with higher transportation cost indexes spend less money on transportation
[1:01:41]
costs because they have these other options, walking, biking, or taking transit. Or simply
[1:01:46]
If they choose to drive, they're driving shorter distances, putting less miles in their
[1:01:50]
car, requiring less maintenance over time.
[1:01:53]
Transportation costs in the area are low.
[1:01:58]
And the high job proximity index is related to the adjacency and inclusion in the downtown
[1:02:06]
area, which is a high employment area for the city.
[1:02:11]
So the site is served by several existing bus services, 1, 2, 6, 12 and the R line.
[1:02:16]
you can see the site here.
[1:02:21]
The request would add to the housing supply. It does not include subsidized
[1:02:28]
units. Discussed earlier the contribution to the affordable housing fund if more than 499
[1:02:34]
units are built. It does permit a variety of housing types, smaller units in the apartment type
[1:02:40]
building. Again, we include walking distance of transit and the affordability analysis because
[1:02:48]
because the cost of living is not just the cost for your housing, it is also the amount
[1:02:53]
of money that you spend on transportation.
[1:02:56]
So if you live in an area where you can spend less money on transportation, it means you
[1:02:59]
have more money for other things.
[1:03:04]
So affordability relies on transportation as well as the point.
[1:03:09]
In terms of land use history, the property was platted into the city in 1885 and
[1:03:16]
annexed in the early 20th century.
[1:03:20]
The original deeds granted by the greater Raleigh Land
[1:03:27]
Company in Glendalewood Subdivision prohibited occupation by persons of color. So there are
[1:03:32]
historic incidents in the area of racial segregation. And also the 1960 Smoky Hollow
[1:03:39]
redevelopment plan, an urban renewal project displaced a community and neighborhood of,
[1:03:47]
according to a News and Observer article from 1960, 165 families from the Smoky Hollow neighborhood
[1:03:54]
for the purposes of widening the street, the seaboard, underpass, and providing off-street
[1:04:01]
car parking.
[1:04:05]
The request is consistent with the Futureland
[1:04:07]
use map. This is the future land use map on the right side of the screen. The future
[1:04:14]
land use map designation is central business district, which is the maroon color. You can
[1:04:20]
also see adjacent to our public park planning.
[1:04:28]
The request is also consistent with the urban
[1:04:30]
form map. The urban form map functions to recommend certain frontage types. So the urban
[1:04:40]
general frontage is consistent with that. This slide and map say a lot more about the case
[1:04:46]
other than just the frontage as well. We know that building height is the primary
[1:04:52]
issue under consideration here. We know that from hearing and working and speaking
[1:04:57]
with the community. That building height is the issue to be considered. Recommended building
[1:05:06]
heights in the comprehensive plan come from a table called LU2 recommended building heights.
[1:05:15]
And that table functions with the future land use map in different contexts in the city
[1:05:21]
to provide recommended building heights. There are essentially two qualifying criteria
[1:05:25]
criteria for what is called the core transit designation on that table. One criteria is
[1:05:33]
being cited on a corridor that is planned or programmed for frequent transit. The site
[1:05:39]
is currently served by frequent transit with the R line service. So it qualifies for the
[1:05:45]
transit aspect of the core transit designation. The other aspect of the core transit designation
[1:05:52]
is being in the core of a mixed-use center of 30 acres or greater. You can see
[1:05:58]
that the site is contained in downtown. The site is contained in the bus rapid
[1:06:04]
transit area which is shown on the map and beyond the bus rapid transit area
[1:06:08]
is the frequent transit area. So taken together this is in the core of those
[1:06:14]
districts. The downtown designation on the urban form map follows the
[1:06:21]
boundaries of downtown. The bus rapid transit area is within a quarter mile of
[1:06:29]
corridors planned for bus rapid transit. So in this case would be capital
[1:06:34]
Boulevard for the capital Boulevard North Study. This distance is roughly
[1:06:42]
half a mile. And then beyond that the frequent transit area is a half mile
[1:06:48]
from Capital Boulevard. So the site is core transit by the qualifying
[1:06:54]
conditions of being currently served by transit, the R lines, the frequent transit
[1:06:58]
service, and within a mixed-use center 30 acres or greater. The request is
[1:07:03]
consistent with the future land use map and the urban form map. There are a
[1:07:08]
number of policies that the request is consistent with in the comprehensive
[1:07:11]
plan, capitalizing on transit access, station area land uses related to the
[1:07:17]
bus rapid transit planning in the area, compact development, healthy communities.
[1:07:23]
Being in the location that it is, folks are more likely to walk, bike, or take
[1:07:27]
transit, active mobility to satisfy transportation needs. And so walking and
[1:07:36]
biking, living next to a park, those are healthy things for folks to do.
[1:07:45]
station area recommended heights. So there is a planned bus rapid transit
[1:07:50]
station in the area. We have transit staff to talk particularly about where
[1:07:57]
that transit station will be located. At the time that the current urban form
[1:08:02]
map was adopted the transit station location was at the corner of West and
[1:08:06]
Johnson Street. That's also reflected on the urban form map with the quarter
[1:08:12]
mile buffer for the BRT transit station. The current planning and location for the
[1:08:19]
that transit station has moved a few blocks to the east and is now planned
[1:08:24]
to be located on Capitol Boulevard and between Peace and Johnson. And so the
[1:08:32]
site is within a quarter mile of that area as well. Downtown edges and
[1:08:38]
downtown transitions.
[1:08:42]
The zoning conditions provided by the applicant
[1:08:46]
to limit building height in feet transitions the mass
[1:08:54]
of the sites down to the other lower slung development
[1:08:59]
in the area.
[1:09:02]
And
[1:09:06]
again, downtown for high density
[1:09:09]
for all the reasons of walkability and job access
[1:09:11]
transit access are consistent. There are no inconsistent policies identified for
[1:09:19]
the rezoning request. There are no outstanding issues and your deadline
[1:09:23]
for action is October 11th. The applicants are here. They'll give their
[1:09:28]
presentation and we can answer your questions following that. Thank you,
[1:09:33]
Matt. Next we'll turn to public comment. The applicant and those in
[1:09:38]
support. We'll have 10 minutes.
[1:09:50]
Good morning, Chair, members of the Planning
[1:09:52]
Commission, Jason Barenworth, Morningstar Law Group. Excited to be here today on
[1:09:55]
behalf of Rally Development Company, who's the proposed developer of this site.
[1:09:59]
I really want to hit on a handful of high points associated with the case. I
[1:10:03]
think the staff report and the staff's presentation has really done an
[1:10:05]
excellent job of analyzing the applicability of the comprehensive
[1:10:09]
plan. And I'm going to talk on a couple of things associated with that,
[1:10:11]
but really there are three overarching themes related to this case. First,
[1:10:16]
it's the right use in the right location. That's what we're always trying to do with respect to
[1:10:20]
when we're rezoning and when we want development to go into a place, is it the right use in
[1:10:24]
the right location? And we submit that this is second, as was mentioned in the staff presentation
[1:10:29]
and the staff support plan, there is no doubt that this case is consistent with the comprehensive
[1:10:36]
plan. Unfortunately, there's a lot of misinformation that's out in the public
[1:10:41]
related to comprehensive plan policies that speak to this case, but there can be no
[1:10:45]
mistake that this case is consistent with the city's adopted comprehensive plan.
[1:10:50]
And third, we have appropriate transitions.
[1:10:52]
This case is actually providing the types of transitions that will ensure that there
[1:10:56]
is context-sensitive transitions to existing neighborhoods while also maintaining the integrity
[1:11:02]
of the comprehensive plan that is so important to making sure that Raleigh can continue
[1:11:06]
to grow and continue to grow in a way that discourages sprawl and encourages
[1:11:10]
the type of infill development that we're looking at in this case.
[1:11:13]
And so, a little bit about the right use and the right location.
[1:11:18]
I do want to highlight a handful of things.
[1:11:19]
This is a layout that we have in our presentation.
[1:11:22]
This is the current planning associated with the development.
[1:11:26]
This is the site kind of in this location here if you can follow my cursor.
[1:11:32]
And as was mentioned, what we have proposed, what the applicant has proposed,
[1:11:37]
is a step down from 30 stories to 25 stories.
[1:11:40]
In addition to that, there are height restrictions associated with that to ensure that nothing
[1:11:44]
greater than 360 feet will be developed adjacent to P Street and nothing greater than 240 feet
[1:11:50]
will be developed along the northern portion of the site. Again, trying to provide those
[1:11:54]
appropriate transitions. As we all know, the city is investing a lot of money in Smokey
[1:12:00]
Hollow Park. It's going to be a tremendous amenity to this development. A lot of planning
[1:12:04]
has gone into this site by Raleigh Development Company to make sure that when this site
[1:12:09]
develops, it appropriately addresses and embraces the park. As a critical
[1:12:13]
amenity, a critical feature in ensuring that folks who live here, folks who are
[1:12:17]
going to be dining here have great access to that park. Additionally, as
[1:12:21]
you're aware, across the street is Publix. I live in downtown Raleigh. Having
[1:12:25]
walking availability to groceries is an incredible amenity to a site like
[1:12:30]
this. Again, it's where you want to put people. It discourages auto
[1:12:33]
dependency. It gets people out. They're allowed to walk and that a lot of
[1:12:37]
that's already happening.
[1:12:38]
And this is why we think density is appropriate
[1:12:40]
in this location.
[1:12:41]
It's also walkable to a lot of the other amenities
[1:12:44]
that are developing in this area.
[1:12:46]
And finally, as was mentioned, related to future transit,
[1:12:49]
there's existing transit stops.
[1:12:51]
It's in a frequent transit area as of today
[1:12:53]
with the bus routes, the multitude of bus routes
[1:12:56]
within proximity to the site.
[1:12:57]
And there's future plan transit in this area
[1:13:00]
that we believe all of those things
[1:13:01]
kind of coming together.
[1:13:03]
It's really incumbent upon achieving the goals
[1:13:06]
of the comprehensive plan. With respect to the comprehensive plan, and so this is just
[1:13:11]
a little bit more of the urban place making that's being provided. This is that break
[1:13:15]
in the building, so this is kind of facing south. This is the larger 30 story portion,
[1:13:21]
and then the 25 story portion here, and then this does a little bit job of kind of giving
[1:13:26]
you a little bit of the scale. And so this is the current thinking, the current planning
[1:13:29]
associated with this site, and this is the building up along peace. They're currently
[1:13:34]
planning for a break in the building with this pedestrian promenade and a featured stair
[1:13:39]
and you can again you can see the way that the park is really being embraced by this development.
[1:13:44]
They're being very very intentional about making sure that what gets developed here
[1:13:49]
is highly complementary to what the city is doing with the park. I'm going to move through
[1:13:54]
the comprehensive plan as quickly as possible recognizing we don't have a lot of time and
[1:13:58]
I've got a couple other speakers but there is no doubt it's in the central business
[1:14:01]
district, it's in the downtown center area, it's in a transit station area. All of these
[1:14:07]
things speak directly to the fact that this is where the Comprehensive Plan is already
[1:14:11]
calling for density. In fact, if you look at those Comprehensive Plan maps, those Comprehensive
[1:14:15]
Plan maps call for up to potentially 40 stories. And again, why we believe this is appropriately
[1:14:21]
transitioned because instead of asking for 40 stories, which is across the street,
[1:14:25]
you may be familiar, caddy corner to this site, next to the public, there's
[1:14:29]
a site that is zoned for 40 stories as of today. Why we believe it is appropriately
[1:14:34]
transitioned because what is being achieved here is taking that otherwise 40 story recommendation,
[1:14:39]
making it context sensitive, stepping the building down to 30 into 25 stories as you
[1:14:44]
make your way north on the site. Again, a little bit more about the transit station
[1:14:49]
areas and I know this is a lot of information to cover in a short span of time so I apologize.
[1:14:53]
But as was mentioned in the staff report this isn't
[1:15:00]
We are developing as directly on top of one of those future transit station maps, future
[1:15:04]
transit station areas. This map and all of these things are directly from the comprehensive
[1:15:09]
plan. It talks about the station area types. This is a downtown station area type adjacent
[1:15:14]
to the site. And those downtown recommendations call for up to 40 stories or more. I would
[1:15:20]
note for you that I think it's important as it relates to your review of this case.
[1:15:23]
One of the things that's clear in the recommendations associated with transit areas is that where
[1:15:28]
where there's a discrepancy, and this is in the land use plan, this is in the comprehensive
[1:15:31]
plan, where there's a discrepancy in building height relative to transit areas in any other
[1:15:36]
map that the city has, those transit areas control that is expressly provided for in the
[1:15:41]
comprehensive plan.
[1:15:42]
And again, I recognize that building height is the centerpiece of this development,
[1:15:46]
and I would tell you unequivocally that this development is satisfying the comprehensive
[1:15:51]
plan's goals with respect to building height and is doing so in a way that will breathe
[1:15:54]
life into those future transit plans.
[1:15:56]
And so with that, I'm going to turn it over to a couple of our speakers and we'll be here to answer questions.
[1:16:10]
Good morning Planning Commission. My name is Larry Miller. I'm President of Glenwood South's Neighborhood Collaborative.
[1:16:17]
We're an association, Neighborhood Association has over a thousand members.
[1:16:22]
We have 14 member board that made up of members of residents and business owners in the community.
[1:16:32]
And we're actually a community that is adjacent to this site, unlike the Glenwood Brooklyn
[1:16:41]
neighborhood which is physically separated from the proposed site by a railroad track.
[1:16:48]
But we thought it was important to show our support for this development.
[1:16:54]
First of all, I'm trying to be brief.
[1:16:56]
I want to say the planning and development staff has done an outstanding job in presenting
[1:17:03]
this and I think you should pay attention to what they have to say.
[1:17:07]
They're your experts.
[1:17:08]
I'm not going to go into the minutiae, but just note that they do indicate that it's
[1:17:14]
consistent with the comprehensive plan, future land use, infrastructure, urban form.
[1:17:20]
I mean, they don't find anything wrong with it.
[1:17:23]
I'm going to just talk about a few of the factors that we think are important
[1:17:29]
and that you should be looking at in the overall public interest for this project
[1:17:36]
and not the private interest of a few vocal opposition.
[1:17:42]
The transportation, it's a walkable neighborhood.
[1:17:46]
We live in the neighborhood. It's great. You want to have a dense development like this
[1:17:53]
in a neighborhood that's walkable. You've got pedestrian transportation. You have the bus rapid transit,
[1:18:00]
the frequent transit. Those have all been talked about. It's also on a bike trail.
[1:18:06]
It's going to be added on West Street scooters. You've got all that.
[1:18:11]
You have all that transportation, which will eliminate the use of the need for cars.
[1:18:18]
So that's a strong factor in its favor.
[1:18:22]
Again, it's adjacent to the Smoky Hollow Park.
[1:18:25]
It will allow access to the park from West Street.
[1:18:28]
Right now, the park is surrounded by property.
[1:18:31]
The only access the city is going to have is from P Street, which is problematic.
[1:18:35]
This will create an additional access to this great park amenity that's going to be built.
[1:18:45]
The affordable housing part of this, the city is all, that's one of the main issues in Raleigh
[1:18:52]
is affordable housing.
[1:18:54]
This is going to provide over a million dollars to put for affordable housing.
[1:19:02]
Again, it is a factor that should be taken into consideration.
[1:19:07]
I'm going to leave some time for another person.
[1:19:10]
I just want to say please look forward to the overall public interest and not the private interests of a few individuals.
[1:19:18]
Thank you.
[1:19:28]
If I may, may I ask for an additional time?
[1:19:31]
I've got about 25 seconds in a time where I would love three minutes if that's allowable.
[1:19:35]
If
[1:19:38]
it's the will of the commission, I will add two minutes.
[1:19:42]
And then I will add two minutes to the other side as well.
[1:19:45]
Great.
[1:19:46]
Thank you.
[1:19:46]
Without objection, we'll add two minutes.
[1:19:48]
Thank you.
[1:19:49]
My name is Will Choi.
[1:19:50]
I'm an architect in Raleigh.
[1:19:51]
I've been practicing for about 20 years.
[1:19:54]
I hold a master's degree in architecture
[1:19:55]
from Harvard University.
[1:19:56]
And I've practiced in several cities across the country
[1:20:00]
designing buildings like this and executing them.
[1:20:02]
Though now my work these days in Raleigh
[1:20:04]
focus on much smaller neighborhood projects and I come here in support of
[1:20:09]
the project today. Now there are a great many local issues in need of grassroots
[1:20:15]
involvement these days in Raleigh. Issues that I believe everybody in this
[1:20:19]
room would agree our city needs solutions for. Real issues like housing
[1:20:25]
affordability, mass transit, downtown safety, our city's environment,
[1:20:34]
so it
[1:20:34]
pretty odd when one takes time off work to speak here instead in support of a
[1:20:41]
rezoning that will supposedly only benefit some private company. But I'm
[1:20:45]
here because I believe density is a necessary component in improving these
[1:20:49]
larger issues I mentioned earlier. If that sounds absurd let me ask, how can
[1:20:57]
we address housing shortage without increasing the supply of housing? How
[1:21:03]
How can we establish mass transit without the mass of people who will write it?
[1:21:08]
How can we increase safety in downtown without any eyes or foot traffic on the streets?
[1:21:15]
Density is a crucial ingredient in making Raleigh liveable for people like me and the
[1:21:20]
thousands of nearby apartment dwellers who did not feel compelled to come out and oppose
[1:21:25]
the rezoning today.
[1:21:27]
Most folks downtown will readily agree.
[1:21:29]
we need things like sidewalks, bike lanes, beautiful parks to make our city livable.
[1:21:36]
But without density, our sidewalks and bike lanes will continue to remain empty,
[1:21:42]
our parking lots larger than the parks we build them for, and we will continue to
[1:21:46]
cosplay a city rather than actually becoming one. We cannot say we care about
[1:21:52]
our environment, public transit, walkability, or housing, and then turn
[1:21:56]
around to reject density. That's about as ridiculous as saying that you love to swim
[1:22:01]
just not when the water is wet. And I hear the voices saying, hey, that's all fine, just
[1:22:07]
not right here next to all these houses. Yet, last I checked, this neighborhood is a single
[1:22:11]
densest neighborhood in all of Raleigh and outside of Charlotte, it is a densest spot
[1:22:17]
in the entire state of North Carolina.
[1:22:18]
Thank you for your comments.
[1:22:19]
So I asked if density isn't appropriate here. Where in Raleigh is this magically
[1:22:25]
better spot that's not near any single family homes. Thank you.
[1:22:31]
Next we will hear
[1:22:33]
from the opposition. You have a total of 12 minutes.
[1:22:38]
Please state your name for
[1:22:40]
the record. My name is Tim Niles and thank you for allowing me to speak.
[1:22:46]
Respectfully, I am disappointed this hearing is being held today when the
[1:22:50]
public has only had access to the staff report since Friday and that was
[1:22:55]
made aware, and the staff was made aware over a month ago that the advocate for the neighbors
[1:22:59]
could not be here today. The presentation he submitted to this body was prepared prior
[1:23:04]
to the staff report being made available. Because of this, it does not address the
[1:23:09]
latest assertions. I'm concerned that both neighborhood meetings were held without access
[1:23:14]
to the staff report. Lastly, I note that two years ago, Transportation reported that
[1:23:20]
this location had been removed from consideration as a transit location. The issue was brought
[1:23:26]
up at the first neighborhood meeting because the applicant claimed the location is a transit
[1:23:30]
location based on an out-of-date map, and every part of their application relies on
[1:23:36]
that designation. Without it, this proposal violates over 40 policies and plans. I
[1:23:42]
was told by planning staff at the end of that April meeting that they would get
[1:23:46]
clarification on the issue, they never got back to me. Transportation staff did reconfirm
[1:23:51]
by email in April that the location has not been identified as a transit station. Now magically
[1:23:58]
when the staff report comes out, West Street is once again identified as a transit location.
[1:24:04]
This seems like a conveniently timed revelation when no one from the city was willing to
[1:24:09]
disclose this information to the public previously. Even when asked directly about it at both
[1:24:15]
the first and second neighborhood meetings in April and July. It gives the impression the fix is in.
[1:24:21]
Lastly, stepping down from 25 stories to two cannot realistically be called a transition.
[1:24:29]
It's laughable. Nearly 1,500 people have signed a change.org petition against this proposal
[1:24:35]
and more are signing it every day. Thank you.
[1:24:41]
Good morning, ladies and gentlemen,
[1:24:42]
Chris Crew 306 Elm Street. This is not the right use in the right location because it's not
[1:24:49]
consistent with the zoning. That's just pure and simple there. A lot of the people in this room
[1:24:55]
participated in the development and adoption of Raleigh's comprehensive plan, the UDO,
[1:25:00]
and a lot of them are passionate about the preservation and care of our unique historic
[1:25:04]
architecture and cultural history. Local zoning is a tool that allows us to do this
[1:25:10]
preservation because we've invested so much in developing and implementing these tools
[1:25:15]
of being proper to grant a spot zoning privilege like the concessions now being requested on
[1:25:22]
a property that has already been re-zoned.
[1:25:25]
Look at the map.
[1:25:26]
The approval of this request would create a perverse and incompatibly irregularity
[1:25:31]
in the boundaries laid out in the zoning map.
[1:25:34]
It's just not right.
[1:25:35]
As far as people being opposed to this, I have a message here from the Society for the
[1:25:42]
Preservation of Historic Oakwood, which I believe was delivered to you by e-mail last week.
[1:25:49]
If you did not receive it, I'll be sure that you did.
[1:25:52]
That's an organization with over 1,600 members.
[1:25:56]
Their Board of Directors voted to oppose this on a number of grounds, first of all,
[1:26:03]
allowing a 30-story mixed-use building within 240 feet of a residential neighborhood with
[1:26:08]
an HOD designation represents an adverse impact that has not been addressed by anything we've
[1:26:15]
heard here. In the absence of detailed and specific design information, it's impossible
[1:26:20]
to judge that this development will be compatible with Section 3.5.5C of the UDO dealing with
[1:26:28]
setbacks. Beyond the questionable compatibility, the approval of this would set the President
[1:26:34]
that 30-story buildings just 240 feet from historic homes is not only allowed, but is
[1:26:40]
fully consistent with the 2030 Comprehensive Plan and its policies, which this request
[1:26:46]
is not consistent with. And in addition to these easily recognized impacts, there
[1:26:52]
were unexamined impacts on traffic, public safety, and public utilities. Did any of you
[1:26:57]
note the flooding down there at the end of West Street yesterday. As a retired
[1:27:01]
emergency manager, that gives me pause. We urge you to reject this proposal on
[1:27:07]
the grounds that it is arbitrary, capricious, and represents an example of
[1:27:11]
spot zoning that conflicts with the UDO and the comprehensive plan. Thank you.
[1:27:19]
Good morning. Matthew Brown, 401 North Person Street. Thank you for your
[1:27:23]
service. Thank you for letting me speak. We're talking about what Raleigh
[1:27:28]
needs. Unlike most cities our size, Raleigh has no historic riverfront or lakefront or
[1:27:37]
mountains or Beale Street or other cultural attractions or Biltmore House or other architectural
[1:27:43]
monuments. We need interest. We need beauty. We need character. That is what these historic
[1:27:51]
districts provide to all the citizens of Raleigh and all the tourists. And that
[1:27:57]
That is why our UDA, UDO protects them, and a comprehensive plan envisions a transition
[1:28:05]
zone.
[1:28:06]
It's zone for 12 stories.
[1:28:07]
That's dense.
[1:28:08]
That's just like the public's building across the street.
[1:28:12]
But 30 stories next to two-story historic neighborhood violates the rule of common
[1:28:18]
sense.
[1:28:20]
And another thing, he's talking about, oh, transit's not a problem because it's right
[1:28:26]
by a capital boulevard. The problem is not north-south, it's east-west. Peace Street is
[1:28:32]
a bottleneck because of the two sets of railroad tracks and the state government mall. And part
[1:28:37]
of it is only two lanes. The traffic is already horrendous. All these people will have cars.
[1:28:43]
The next street, east-west street north of this that crosses both sets of railroad tracks
[1:28:48]
is the Belt Line. That's why it's a bottleneck. And the city has already approved all this
[1:28:56]
high density development along there, a caddy corner to this, a skyscraper, two skyscrapers
[1:29:03]
at seaboard. When all these things are full, there will be constant gridlock on P Street
[1:29:08]
and everybody will say, where were our planners? How could they let this happen? This is crazy.
[1:29:15]
There's tons of wonderful places to put a 30 story building. On this overloaded street
[1:29:22]
Next to this historic treasure is not the place. Thank you.
[1:29:31]
Good morning. My name is Gaston Williams and clearly I'm not Esther Hall. She's away on family business.
[1:29:36]
But I am a member of the Preservation Raleigh Inc., a newly created preservation advocacy group in Raleigh.
[1:29:43]
And we're opposed to the zoning request as submitted.
[1:29:47]
We haven't had a chance to look at all the details because they were recently released.
[1:29:51]
but we believe that allowing the construction of what could be a 30-story
[1:30:00]
A residential neighborhood designated as a historic overlay district significantly impacts that
[1:30:07]
historic district. We're concerned with the lack that given the fact that this site is partially
[1:30:14]
elevated and the height is so important that maybe in this case too much is too much.
[1:30:22]
This represents an urban wall that's going to be erected and without a lot of detail
[1:30:27]
and fully comprehend it. Excuse me, I'm sorry. Could I please ask that we silence our phones?
[1:30:35]
Madam Chairman, it wasn't me this time.
[1:30:39]
Without your getting and demanding actually, a real
[1:30:43]
detailed topography understanding what this represents from the perspective of not just
[1:30:49]
the buildings around it, but also the neighborhood above it, and also what it means to the
[1:30:54]
park and everything else. We don't think that this should be approved without a great
[1:31:00]
deal of study about the topography and the relative scale, and that cannot be accomplished
[1:31:05]
by one-dimensional drawings that you often get in these situations. More broadly, we
[1:31:13]
question whether this is really consistent with the comprehensive plan, suggesting that
[1:31:18]
that this sets a great precedent for many historic neighborhoods in the area that could
[1:31:25]
result in a destruction or diminution of the historic districts. The consequences for long-term
[1:31:32]
residents of these areas are great. We're going to have profound overwhelming building
[1:31:38]
scale increases traffic, noise, sunlight, glare, and as frequently pointed out, the traffic
[1:31:46]
traffic problem is going to be, as mentioned, the number of units in here, it's going to
[1:31:51]
be a real artful day to get through P Street with all the traffic that's going to be dumped
[1:31:55]
into P Street.
[1:31:57]
So we believe this proposal for a high density project on the core of the historic area
[1:32:07]
largely residential represents the possibility of being argued in the future to diminish
[1:32:13]
other neighborhoods.
[1:32:13]
We urge the Planning Commission to request more detail before approving it or otherwise
[1:32:19]
reject this proposal as it's submitted.
[1:32:22]
Thank you.
[1:32:22]
Thank you.
[1:32:23]
Just real quick, not on my time.
[1:32:25]
Thank you all.
[1:32:26]
I've been in a situation along with Esther where you all are sitting and devoting your
[1:32:30]
time to this effort.
[1:32:30]
We appreciate it and I understand it more than others.
[1:32:36]
Madam Chair, fellow Planning Commission members, my name is Ben Kuhn at 1223 Pierce Street,
[1:32:43]
Raleigh.
[1:32:43]
I've practiced, I'm a land use lawyer.
[1:32:46]
I work with developers and land use issues, variances and so forth.
[1:32:50]
I've been before this body several times before.
[1:32:52]
I was before you when this came before you in committee and also last time when they
[1:32:57]
sought to have it rezoned, that rezoning was ultimately denied.
[1:33:00]
This needs to go back to committee.
[1:33:02]
There's been policy changes since this last came before you in the adoption of
[1:33:06]
the transition zone which does have significant impact in the policy framework that this
[1:33:12]
has and it's not, hadn't been mentioned once. But that was adopted by city council last
[1:33:17]
time and it is a policy issue and layer that you need to consider. You also have to understand
[1:33:22]
it's, to me, as a land use lawyer, it's not about the use or the location. It's
[1:33:29]
about the height of it, which is completely out of odds with the context of the area.
[1:33:35]
It's not in a transit station area. The West Street and Johnson Street station area
[1:33:41]
It is off the books in terms of communication I had with Hett Patel two years ago, which
[1:33:45]
I presented to the City Planning Commission, I believe, at that time.
[1:33:52]
We have that documentation.
[1:33:53]
It's supposed to be at Capital Boulevard right where it verges off right behind the Long
[1:34:00]
Leaf Hotel.
[1:34:01]
If you string a line from that point to this site, it's .26 of a mile, more than
[1:34:10]
a quarter mile. Even if you argue that it's within the transit station area for that location,
[1:34:14]
it's at the very edge of the transit station area. And what I would point you to is the
[1:34:20]
Equitable Transit Oriented Development Guidebook, the policy that guides development within
[1:34:26]
transit areas. And it suggests to you that in a transit area at the transit station,
[1:34:32]
that's where the most heightened density would be. And guess what? As you venture
[1:34:37]
further and farther outside from the transit station area. The document says specifically
[1:34:44]
the policy guidance is that the height and the density would taper and transition down
[1:34:49]
towards any nearby neighborhoods that are residential density. So for that reason, more
[1:34:56]
policy guidance is needed and needs to be put in committee and we appreciate that consideration.
[1:35:03]
Thank you.
[1:35:03]
Thank you. Thank you all for your comments. Okay, we will bring it back to the table.
[1:35:11]
Commissioner Neptune.
[1:35:13]
Thank you, Madam Chair. Just briefly, I'd like to acknowledge and express my thanks
[1:35:19]
and gratitude to all of the residents for being here this morning on your time.
[1:35:25]
Just deeply appreciate you taking time out of your day to be with us to share your concerns.
[1:35:36]
And I guess there's a quick follow on that just to make sure I'm hearing it clearly.
[1:35:41]
It feels as if there are sort of two buckets of concern.
[1:35:46]
There's like the height and our homes, you know, like the height of the potential buildings and our homes.
[1:35:53]
and then separate but of course related is transit and traffic and if we just kind
[1:36:01]
of I just want to ask a follow-up question to make sure I'm clear and I
[1:36:04]
think it's a question for we'll start with transit and traffic maybe start
[1:36:07]
with transportation staff you know I'm under the impression and just you know
[1:36:13]
based on the review of the materials also based on prior service with the
[1:36:21]
2019 and being familiar with this corridor, my impression and understanding is that since
[1:36:28]
at least 2016, at minimum, when we adopted this Wake County Transit Plan, there have
[1:36:34]
effectively been plans and studies and designs for a future transit sort of corridor.
[1:36:44]
So I know we're working on this like bus rapid transit corridor on the one side.
[1:36:48]
And then if transportation staff could speak to this, I think there's like an S-line high-speed rail connection.
[1:36:53]
We're also working on, I think we've got federal funding to support this.
[1:36:57]
I mean, all these systems are kind of moving forward.
[1:37:00]
But again, I would welcome transportation staff if you could maybe speak to that briefly as far as the transit-related operations.
[1:37:08]
That, again, just from my understanding of the review of the materials and just from prior commission service,
[1:37:14]
If you could speak to the transit-related operations that are in development for the corridor.
[1:37:21]
I think that it would be helpful to hear in relation to the concerns around traffic and gridlock congestion that we're hearing from the residents.
[1:37:32]
If I could just add to that, there seems to be some concern about the location of the proposed transit station.
[1:37:42]
So, if you could just speak to the decision-making around where the transit station is proposed
[1:37:51]
to be, that might clear up some of this confusion as well.
[1:37:55]
Yeah.
[1:37:56]
Thank you, Commissioner Neptune and Chair Bennett.
[1:37:58]
We have Carter Robertson with the Transportation Department, who can speak to the trip generation
[1:38:03]
traffic analysis and existing conditions for car flow, and we also have Gabriel Wilkins
[1:38:09]
from transit planning to enter questions related to BRT and other transit services.
[1:38:16]
Thank you.
[1:38:17]
And maybe just I would note to staff as you approach, if you could just share briefly, very briefly,
[1:38:22]
just the background on these transit plans that are in development in progress,
[1:38:29]
I think that would be appreciated by the Commission.
[1:38:31]
Of course, good morning, Commission.
[1:38:34]
Gabriel Wilkins with Transportation and Transit on the BRT team.
[1:38:37]
So I'll start with Bus Rapid Transit.
[1:38:39]
Carder can handle SLINE and my colleague, Melanie,
[1:38:42]
will be able to answer questions about
[1:38:44]
ordinary fixed route service here.
[1:38:47]
So the Bus Rapid Transit system in Wake County
[1:38:52]
was initially planned by a major investment study
[1:38:55]
ahead of the 2016 Wake Transit Plan.
[1:38:58]
So that included four corridors,
[1:39:00]
Newburn Avenue, Southern, Western, and Northern.
[1:39:03]
At the time, the Northern BRT corridor in that study,
[1:39:06]
2016, only included from the downtown portion out up Capital Boulevard to where it diverges
[1:39:13]
off to Wake Forest Road.
[1:39:16]
So it was initially just that kind of stub with the idea that it would be revisited later
[1:39:21]
after the other corridors advance in their planning.
[1:39:26]
The 2019 Raleigh Comprehensive Plan took those major investment studies, the corridors
[1:39:32]
for BRT from those studies and that's what kind of fed into the map that the
[1:39:37]
applicant showed about the transit station areas downtown. Those are bus rapid
[1:39:41]
transit stations. Bus stops kind of a different level of transit we can get
[1:39:46]
to later. So currently that northern corridor is being revisited in a new
[1:39:52]
major investment study to consider the downtown to its actual endpoints. That
[1:39:57]
is slated to wrap up the end of this year, which will kind of come out with two identified
[1:40:04]
kind of preferred corridors for that route. Now, those studies are taking as a starting
[1:40:11]
point the existing 2016 study. So from that Wake Forest, a capital, and going one route
[1:40:16]
up to Midtown and one route towards the Triangle Town Center area. The zoning case
[1:40:24]
This here is located within that kind of stubbed portion that was already within kind
[1:40:29]
of planning.
[1:40:31]
There were two kind of different routes for how it might move around.
[1:40:37]
West Street was included at the time.
[1:40:40]
In going through planning, Capital Boulevard is currently the preferred location.
[1:40:46]
Specific stations will not be identified until preliminary design is entered.
[1:40:52]
And that follows the kind of conclusion of a major investment study.
[1:40:56]
The Newburn, Southern, and Western BRTs are all currently, well, Newburn's getting ready
[1:41:01]
to be built, Southern and Western have completed that preliminary design into final design.
[1:41:06]
That's where those specific station locations get nailed down.
[1:41:09]
Part of the major investment study looks at identifying key intersections at which
[1:41:13]
a station, near which a station would be located so that we can model ridership potential,
[1:41:19]
see what the kind of development may look like around the stations and how
[1:41:24]
connections to other fixed route, other active transportation, bicycle and
[1:41:29]
pedestrian, and kind of other amenities such as parks might happen. The
[1:41:34]
intersection around peace street and capital boulevard has been identified
[1:41:38]
since that 2016 plan through to today as an area of interest to locate a bus
[1:41:44]
rapid transit station and that remains true. Where it will actually be
[1:41:47]
located depends a lot on engineering concerns given the kind of lots of topography and grade
[1:41:55]
separated areas there. But that area is kind of of key interest from 2016 to now for a
[1:42:01]
bus rapid transit station.
[1:42:03]
Thank you.
[1:42:04]
Thank you. A quick follow-up. So just briefly, the actual locations have not been identified.
[1:42:11]
That won't happen until we get farther into engineering, planning, et cetera. Just
[1:42:16]
Just make sure I'm clear on that.
[1:42:17]
Correct.
[1:42:18]
And that is why that quarter to a half mile buffer, quarter mile buffer is where this kind
[1:42:23]
of …
[1:42:24]
And then it's a quick follow-up for the applicant or the developer on the project.
[1:42:29]
Have they been involved at all or have they expressed interest in working with the city
[1:42:34]
in this, I guess, potential connectivity to the transit station?
[1:42:39]
I mean, perhaps you could speak to it, perhaps the, I guess, the attorney here on behalf
[1:42:43]
of the applicants could speak to that the interest of the developer in coordinating the development
[1:42:50]
with the transition. I mean, it seems like, I feel like that was included in the presentation,
[1:42:54]
but maybe you could speak to that in more detail on behalf of the applicant.
[1:42:57]
Sure. Commissioner Naptan, we absolutely have been following it. Chris Carter and
[1:43:01]
Raleigh Development Company have been following the discussions associated with BRT recognizing
[1:43:05]
that as this site develops, as well as the sites that are in proximity to the site,
[1:43:09]
having access to transit is of critical import. So absolutely interested in continuing
[1:43:13]
in that work with the city and certainly we'll be following it as we go.
[1:43:16]
Thank you.
[1:43:17]
Thank you all.
[1:43:18]
Now, if we could hear about the S line and I guess any work on that?
[1:43:23]
I just want to keep us on track.
[1:43:26]
This is a frequent transit designation because of the R line, correct?
[1:43:32]
So that's not even, I don't want to say it's not relevant, but it's really not relevant
[1:43:37]
to the frequent transit designation of this area.
[1:43:40]
So I just want to make sure we're able to talk about the TIA and the height and all of our other questions that we might have.
[1:43:51]
Is that okay?
[1:43:53]
I suppose it seemed relevant in that it's also within the context of the neighborhood.
[1:44:01]
And right now, if I'm hearing it correctly, we have residents who are concerned about the proximity of the development.
[1:44:08]
and just I guess I'm trying to seek clarity on the neighborhood, their
[1:44:15]
backyards, the rail line which is being upgraded to this high-speed rail line
[1:44:20]
and then we have this currently zoned industrial I guess mix use okay and then
[1:44:25]
we have a street and then we have this development that's what I'm trying to
[1:44:28]
get clarity on. So very briefly could you just tell us about the S line and
[1:44:33]
it's proximity to. I can yes and also Commissioner Maynard you raise the valid
[1:44:40]
point for consideration is regardless of the BRT transit location the site is
[1:44:47]
qualified as core transit on Table LU2 by its service of existing transit today
[1:44:55]
the R line.
[1:45:00]
And its location within a mixed use center of 30 acres or greater, qualify it.
[1:45:07]
One or the other qualifies. This qualifies both. So the language in the comprehensive plan says
[1:45:11]
core transit can be qualified with either planned frequent transit. It has frequent transit
[1:45:18]
today. So that qualifies. The other is its location within the bus rapid transit area
[1:45:24]
downtown and the other mixed use centers on that map. Thank you. Yeah.
[1:45:33]
Good morning
[1:45:34]
everyone. Carter Robertson with transportation. I'm going to find a
[1:45:38]
picture here so I could orient us towards the site and the S line and how
[1:45:44]
those two will interact.
[1:45:48]
A little more zoomed in. Here we go. So brief
[1:45:52]
overview of what the S line project is. It's a partnership between NCDOT
[1:45:59]
and the Virginia passenger rail authority to connect Richmond to Raleigh with
[1:46:04]
high-speed rail. And so a federal grant was granted for construction from Raleigh
[1:46:12]
to Wake Forest in 2022, I believe.
[1:46:17]
Specific to the site where it will run
[1:46:20]
is just on the other side of West Street here. We have the existing railroad
[1:46:28]
road track, the SLINE will align a little bit to the east of it there, overlapping a
[1:46:34]
bit with those buildings. So, some right-of-way and property acquisition is going to be required.
[1:46:41]
That was included as part of the grant design, right-of-way acquisition, and construction.
[1:46:48]
Currently, U.S. DOT is working through a backlog of grants that haven't been designated
[1:46:56]
yet, and S-Line is one of those that they are working on, and so once that gets encumbered
[1:47:03]
to this project, we'll have the green light for construction. That's a big overlap of
[1:47:10]
S-Line. They would be separating this development from the neighborhood to the west, approximately
[1:47:17]
as you see that line that I drew.
[1:47:21]
Thank you, and thank you, Madam Chair, for bearing with live.
[1:47:24]
Of course. No problem.
[1:47:26]
Danielle, we were going to talk about, I believe you wanted to hear about the traffic and what the traffic study showed.
[1:47:33]
Right.
[1:47:34]
So a traffic study was not required for this site.
[1:47:38]
Matthew did a good job of explaining earlier.
[1:47:42]
At rezoning what we're looking at is the difference between trips generated under the current zoning and the proposed zoning.
[1:47:49]
And in this case, the office entitlement was reduced significantly.
[1:47:55]
Industrial entitlement was cut out entirely.
[1:47:58]
And so those two land uses typically are high driver of trips in our model.
[1:48:03]
And so while there is an increase in density for residential, the overall trip impact
[1:48:09]
is less than what is currently, what the site is currently zoned for.
[1:48:15]
So that's why a traffic study was not required at rezoning.
[1:48:18]
one may be required at site plan if it meets the triggers that we look at at
[1:48:24]
that stage. I hear the residents concern about P Street. We do realize that that
[1:48:32]
is an issue of east-west vehicle connectivity for downtown. Right now the
[1:48:39]
volumes that we're seeing on P Street is around 17,000 vehicles per day.
[1:48:44]
that's in line with our projections for a four-lane divided avenue. Another thing
[1:48:51]
I wanted to highlight, we've talked a lot about walkability in the site and
[1:48:56]
current and future transit. This intersection of peace in West Street is
[1:49:01]
also going to be very valuable as a part of our future bike network. As I've
[1:49:07]
mentioned before, at Planning Commission, we're working on our active
[1:49:11]
Mobility Plan, and right now our draft is designating both Peace Street and West and
[1:49:17]
Harrington as priority bike corridors, Peace Street. We would like to see upgraded to a
[1:49:23]
separated facility to provide that east-west connection for the city in terms of cycling.
[1:49:29]
Just briefly, I think the two former chairs of the Bicycle Pedestrian Advisory Commission
[1:49:32]
deeply appreciate hearing about this future connectivity for our cyclists in the community.
[1:49:37]
so thank you and the walkers too and the walkers too.
[1:49:43]
Does that answer your
[1:49:44]
question? It absolutely does thank you. Thank you. Commissioner Miller. May I have a
[1:49:50]
quick follow-up for traffic? Could you also just address the projections about
[1:49:54]
P Street and the forthcoming development and any plans that may be in the
[1:50:00]
area to address traffic concerns? Not directly related to road capacity I
[1:50:09]
I mean, the overall vision for downtown
[1:50:12]
and adding these different forms of travel
[1:50:16]
is to increase the mode share between vehicles,
[1:50:20]
pedestrian, cyclists, and transit.
[1:50:23]
So that's our overall approach for this area right now.
[1:50:26]
We don't have any specific projects
[1:50:29]
that would address specifically vehicle capacity.
[1:50:33]
It's gonna say, is that part of the city's policy
[1:50:34]
see where we sometimes put stress on an area on traffic while increasing, on car traffic
[1:50:40]
while increasing alternative options in order to try to pursue those alternative policies
[1:50:46]
in the area?
[1:50:49]
I would have to review our policy a bit on that.
[1:50:53]
Okay.
[1:50:58]
Commissioner Outville.
[1:51:00]
Thank you, Chairman.
[1:51:02]
When this property was up for rezoning the first time around a couple years ago,
[1:51:07]
I voted in favor of the rezoning. When the text change came before us to add the
[1:51:14]
area to a downtown transition zone I voted against it and but nevertheless
[1:51:19]
it's now part of the city policy. Coming into this meeting I thought that I
[1:51:24]
would be voting against this proposal due to that condition until I got into
[1:51:31]
my studies and read the actual definitions and the text is very
[1:51:35]
clear that, let me see, it's DT 1.14, I believe, which states that these transition areas should
[1:51:45]
be used for lower height developments, but if there is existing overlay zoning in the
[1:51:54]
area, that should take precedence unless there is a small area plan that's implemented.
[1:51:58]
I think this area is very clearly defined as a core transit area by the definition that
[1:52:07]
goes along with Table LU2 and the comprehensive plan, and as such, like regardless of where
[1:52:14]
the BRT gets placed, it's served by frequent transit at this time.
[1:52:19]
And I think it is defined as such, it's very clearly part of the core downtown area
[1:52:25]
and the future land use map.
[1:52:27]
And if you reference table LU2, which
[1:52:30]
is supposed to be our primary reference for determining
[1:52:35]
building heights and rezoning, this clearly
[1:52:38]
qualifies for the kind of height that is being requested.
[1:52:43]
I believe our job is to give our interpretation
[1:52:46]
of the planning documents and give
[1:52:48]
an assessment of whether we think
[1:52:50]
it's in line with the policies and documents as they exist.
[1:52:53]
It's not our opinion on whether we think that this is a good or bad development.
[1:52:58]
I wish this had a shot front urban form designation.
[1:53:02]
I think that would be better.
[1:53:03]
I am concerned about traffic.
[1:53:06]
I wish that the project contains stronger conditions about supporting the park.
[1:53:10]
But these are not part of our decision on whether the zoning meets the planning
[1:53:16]
documents or not.
[1:53:17]
That table LU2 is very definitive in this projection.
[1:53:24]
And to address the concern that this sets a precedent across the city, these conditions
[1:53:29]
don't exist across the city.
[1:53:31]
That you have a 30-acre mixed use area, the front on frequent transit zones, and that
[1:53:44]
cross-reference on table LU2, see if I can get there. Sorry for my scrolling
[1:53:49]
around.
[1:53:58]
These kind of heights are only recommended at the
[1:54:02]
intersection of a core transit area and a central business district or downtown
[1:54:08]
core zone and this does not exist across the city and I don't think that
[1:54:12]
this puts neighborhoods across the city at risk or sets a precedent. I'm going
[1:54:18]
to be voting to support this proposal when the time comes.
[1:54:21]
Thank you, Commissioner.
[1:54:23]
I will appreciate you going through Table LU2 and the policy.
[1:54:29]
Could I ask staff, maybe Mr. Clem or Bynam,
[1:54:34]
we heard a few times about the staff report not being
[1:54:39]
available at the neighborhood meetings.
[1:54:43]
Are they typically available at neighborhood meetings?
[1:54:45]
Could you talk about the timing of when
[1:54:47]
the staff report comes out versus when the applicant neighborhood meetings are held?
[1:54:52]
So like this case and others, when there is a second neighborhood meeting required by
[1:54:57]
the code, the case will not move forward to planning commission review until the second
[1:55:03]
neighborhood meeting is conducted. So the staff report won't be published until your
[1:55:10]
first review of the case, which is today. So it is not typical that the full staff report
[1:55:17]
is done by the time of the second neighborhood meeting because the case is not complete and
[1:55:23]
ready for review until that is done. So in the rezoning process laid out in the Unified
[1:55:29]
Development Ordinance,
[1:55:33]
the second neighborhood meeting has to occur before you have your
[1:55:37]
deliberations, and the staff report is not published until your first deliberations.
[1:55:45]
So that is a condition that is perennial to the process.
[1:55:49]
Thank you.
[1:55:56]
Has there been any studies on the environmental impact of the neighborhoods around the project?
[1:56:01]
And anybody, these are questions that anybody can answer.
[1:56:05]
So we have stormwater staff that can speak to the stormwater runoff and what the
[1:56:11]
code requires in terms of addressing those conditions.
[1:56:15]
We have some analysis in the comprehensive plan, recommends encouraging walkability,
[1:56:21]
encouraging transit use, and active mobility as an encouragement to burn less fossil fuels.
[1:56:30]
The staff report also contains metrics comparing detached houses to apartments and townhouses
[1:56:39]
and other building types that have shared walls.
[1:56:42]
We know that when folks live in a building type
[1:56:47]
that shares wall with a neighbor,
[1:56:49]
that both of them use less natural resources
[1:56:53]
for heating and cooling because they insulate each other.
[1:56:56]
So within the staff report and within the comprehensive plan
[1:56:59]
there is guidance that encourages dense walkable,
[1:57:03]
mixed use, apartment use and townhouse development
[1:57:06]
and an effort to reduce the per capita carbon emissions from folks living in the city.
[1:57:13]
What's been the consistent or the average feedback from community engagement about the project?
[1:57:19]
So there is a engagement portal that we put up for every rezoning case.
[1:57:27]
The particular responses from the engagement portal for this case,
[1:57:33]
I believe had four comments in support and four comments in opposition.
[1:57:39]
So that's the city's official engagement opportunity for every case.
[1:57:48]
We have received a number of emails though over the last several weeks.
[1:57:54]
Even though the engagement portal wasn't really used, we've received a number of emails.
[1:57:59]
That's why I'm trying to figure out what the average response to this project has been
[1:58:05]
from your community engagement.
[1:58:07]
Has the overarching response been in opposition or has it been in support?
[1:58:14]
Yeah, I would say based on the engagement portal and then also outlined in the report
[1:58:20]
is some summation of the neighborhood group who came to speak today and their online
[1:58:26]
online postings and social media has been an opposition to the case.
[1:58:32]
I also see that where did the $1.2 million number come from for affordable housing?
[1:58:38]
That was provided by the applicants.
[1:58:41]
We can ask them up to speak to how they came to that number if you'd like.
[1:58:46]
Yes, please.
[1:58:50]
Could the applicant address the question of where the $1.2 million figure came from?
[1:58:57]
The
[1:59:09]
affordable housing, the number it specifically came to be as a result of 30 units at $40,000
[1:59:16]
per unit.
[1:59:17]
Okay.
[1:59:18]
And I know that they said that there were conditions on the affordable housing contribution.
[1:59:25]
Why?
[1:59:27]
Are there conditions?
[1:59:28]
Like whether or not you get so many stories determines whether or not the contribution
[1:59:33]
is made.
[1:59:34]
Excuse me.
[1:59:35]
Yeah.
[1:59:35]
So, from a timing standpoint, and I think what you're getting at is we're not making
[1:59:42]
the payment.
[1:59:42]
The developer is not making the payment until the 500 unit.
[1:59:46]
And primarily, that's related to being able to finance the deal, because so you can start
[1:59:51]
the building and then you can make a contribution as you're being able to occupy units
[1:59:56]
It's either.
[2:00:01]
I would tell you that their intention, the developer's intention, is absolutely to make
[2:00:06]
that contribution. We could do, they could do 500 units as of today. They could do 499 units
[2:00:11]
as of today, but they wouldn't be going through this process if their intent wasn't to significantly
[2:00:16]
exceed that 499 unit count and make that contribution.
[2:00:23]
had another one, but I'm still looking if anybody else has other questions or comments
[2:00:27]
from commissioners.
[2:00:31]
One more question. Is there any economic
[2:00:33]
benefit to the community benefit to this project like economic development. I know
[2:00:38]
there'll be shops open, minority participation on the project or I mean
[2:00:45]
minority participation goals on the project things like that. So there are
[2:00:50]
no conditions that speak to minority participation in
[2:00:55]
future businesses that may occupy the site. In terms of economic benefit
[2:00:59]
there are two factors that we look at with every case. One is the
[2:01:06]
is the jobs proximity index. So in terms of the residents of a new structure here would see some
[2:01:14]
economic benefit of having reduced costs for their transportation because of all the other options
[2:01:22]
that are available to them walking, biking, taking a scooter, taking the bus.
[2:01:27]
That's one. The other economic benefit is the very high job proximity index. Folks who live
[2:01:34]
in this site we'll be able to walk, bike, or take a bus to a job in downtown
[2:01:42]
whether that's a job in an office or a job in a restaurant. Any job downtown is
[2:01:48]
a very large job center for the city. It is the city's central business
[2:01:56]
district. So if you live in this location then you will have economic
[2:02:01]
benefit of proximity with the owner of the project be willing to put minority
[2:02:06]
participation goals on this project as a condition.
[2:02:16]
Commissioner I think that's
[2:02:17]
something that my client is definitely interested in exploring at the time of
[2:02:21]
permit approval. We talked about this specifically and the possibility of how
[2:02:26]
could you craft an enforceable condition relative to minority business
[2:02:31]
participation at part of the zoning stage and it's really tough to do I
[2:02:35]
I think from an enforceability standpoint,
[2:02:37]
I'll lean on the staff to answer that question.
[2:02:39]
But Raleigh Development Company is just that.
[2:02:41]
They're Raleigh Development Company.
[2:02:42]
They've been in this area for a long time.
[2:02:44]
They care deeply about the area that they're invested in
[2:02:47]
and they're absolutely gonna be looking for opportunities
[2:02:49]
to engage minority contractors in the process.
[2:02:52]
I don't think that would be a zoning condition
[2:02:56]
could staff or the attorney comment
[2:02:59]
on whether that would even be
[2:03:00]
an appropriate zoning condition.
[2:03:06]
This is the first time I've heard about that condition. I'd probably have to look
[2:03:10]
into it and get back to you. I
[2:03:15]
have a question for the community. I want to ask
[2:03:17]
one more question. We don't typically question the public, but you can go ahead
[2:03:22]
and ask a question and if staff or the applicant can answer it.
[2:03:28]
Typically that's Commissioner
[2:03:33]
Fox. Commissioner Fox, Commissioner Burnett, I'm sorry.
[2:03:36]
Yeah, I just wanted to know, although there are always ways to make a project better, I'm
[2:03:43]
not finding any inconsistencies with adopted plans and policies.
[2:03:48]
So for that reason, I'm ready to support this at the appropriate time.
[2:03:53]
Thank you, Commissioner Flux.
[2:03:54]
Commissioner Burnett.
[2:03:55]
This is a question for the applicant.
[2:03:58]
Just regarding what would you say to the neighboring, I guess, you know, residents,
[2:04:01]
business owners, restaurant owners, and so on and so forth, how this would be a benefit
[2:04:06]
to the community, their businesses, and just the community at whole.
[2:04:12]
Yeah. Again, as has been touched on a number of times, Commissioner Burnett, locating density
[2:04:16]
in an area like this that is planned for increased multimodal access, but certainly
[2:04:23]
already what exists today is walkable access to the businesses along Glenwood South.
[2:04:29]
There's certainly walkable and bikeable access down to Union Station to get
[2:04:32]
people out and around. And so without a doubt having density of this type in this location
[2:04:37]
in an area that is already starting to really grow into something unique and interesting,
[2:04:42]
I think can only help continue to grow the businesses that you're seeing not only pop
[2:04:47]
up that have been at Glenwood South, but also at Smokey Hollow and other places in proximity.
[2:04:55]
Any questions or comments? Commissioner O'Haver?
[2:05:01]
I'm not sure if this is for the applicant or for staff, but can somebody help me understand
[2:05:06]
the intent of adding 20 additional feet to both zones if the primary street is
[2:05:15]
P Street versus West Street. I know that's 20 feet. We're talking about 240,
[2:05:21]
but I'm just trying to understand what the intent of that is. We're going from
[2:05:25]
12 to 25. That's pretty significant. So I'm trying to understand what two
[2:05:29]
additional stories if P Street's primary. So I don't know if that came
[2:05:33]
from the applicant or staff, but I'm a little confused by that.
[2:05:36]
That's fair.
[2:05:37]
That absolutely came from us as the applicant team, and it really depends upon, as was discussed
[2:05:42]
during the staff's presentation, whether West Street or P Street ends up being the
[2:05:47]
primary street.
[2:05:48]
Our goal is to make sure that from on the northern portion of the site that 240 feet
[2:05:53]
is going to be measured from West Street.
[2:05:56]
And so if West Street is designated as the primary street for the development of that
[2:06:00]
portion of the development then it will be 240 feet. There's 20 feet of grade
[2:06:05]
change roughly from west to east as you make your way left or right. So west to
[2:06:09]
east there's 20 feet of grade change as you head down. So that 20 feet is just
[2:06:13]
really recognizing the fact that if we end up having P Street designated as
[2:06:18]
the primary street, de facto it's going to increase the building height by 20
[2:06:22]
feet because it's now being measured from the low point of the site
[2:06:25]
rather than the high point of the site.
[2:06:31]
That makes sense. Struggling with
[2:06:34]
it a little bit, 20 feet, if it's primary amount. I think again, I think you're asking
[2:06:39]
for a significant increase here.
[2:06:43]
Let me just process that for a minute. I totally understand
[2:06:46]
technically what you're talking about, but I'm hung up on that a little bit.
[2:06:51]
That's fair. And to further explain it, really the intent behind that was to provide
[2:06:55]
predictability associated with building heights. As you're aware, a 30-story building,
[2:06:59]
residential, commercial, you know, office can vary wildly. And so one of the things coming
[2:07:04]
into this process in order to provide the transitions that we've talked about, one of
[2:07:08]
the things that was important for Raleigh Development Company, was providing predictability
[2:07:11]
associated with what are those building heights going to be. And so when we started
[2:07:15]
the process, we committed to doing 360 feet along kind of the corner, the zone two,
[2:07:22]
if you will, and then 240 feet in this location here. As we were working our way
[2:07:28]
through the process, we realized that could be measured from two different places, which
[2:07:32]
is why we ended up having that 20-foot variation because we wanted it to be clear to everyone
[2:07:37]
without any doubt that 240 feet is measured from West Street and that 360 feet is measured
[2:07:42]
from the corner of West and Peace. Really, just to provide those transitions to the
[2:07:47]
neighbors who have expressed concerns associated with building height.
[2:07:51]
So regardless of the primary street, why can't that be a condition that the building
[2:07:55]
height is measured from West Street?
[2:08:00]
Yeah, so thank you for the question.
[2:08:04]
Where building height is measured from is dictated in the unified development ordinance.
[2:08:12]
And zoning conditions can't alter how things are measured, basically, is the short answer.
[2:08:19]
How or where, for example.
[2:08:21]
So they set up some scenario to account for that in the zoning conditions.
[2:08:25]
Does
[2:08:28]
that address your question? Commissioner Haber?
[2:08:31]
Yes, ma'am. Thank you.
[2:08:35]
Questions, comments? Other? Commissioner Miller?
[2:08:38]
One final comment. Just wanted to, not a question.
[2:08:42]
There's been a lot of discussion about the benefit to the businesses and to transit and the walkability.
[2:08:47]
I just wanted to also note similarly to when this case came up to us previously,
[2:08:53]
the benefit to the park as well, being immediately adjacent.
[2:08:57]
we've heard time and again a park is as successful as its edges. I too would have been interested
[2:09:03]
in more retail or a shopfront urban form designation, those kind of things along the line. Maybe
[2:09:10]
that's something that the applicant can still think about when it terms in terms of putting
[2:09:14]
in retail. But I am encouraged and look forward to seeing how this positive impacts the park
[2:09:20]
as well.
[2:09:24]
Commissioner O'Haver, are you reaching? Sorry, procedural question. Is this the first
[2:09:29]
First bite of the cherry or is there an opportunity to change these ordinance?
[2:09:33]
I know we've seen this case before, but.
[2:09:35]
No, we haven't.
[2:09:36]
This is the first time we're seeing this particular.
[2:09:39]
So there is an opportunity to request that the applicant reconsider some of the conditions
[2:09:45]
procedurally.
[2:09:47]
Okay.
[2:09:47]
Thank you.
[2:09:48]
Are there conditions that you would like them to consider or reconsider?
[2:09:53]
Well, I've heard a couple comments from commissioners about shopfront, which I think I agree
[2:09:58]
with.
[2:10:01]
I can probably be convinced, but I'm still hung up a little bit on 20 feet. I don't
[2:10:06]
know where Jason went, but a little bit in the weeds. I agree with Commissioner Miller.
[2:10:12]
I appreciate the 15,000 square feet. A lot of times, technically, these projects downtown
[2:10:18]
are required to provide open space, but due to the technicality of it, it's really
[2:10:24]
not usable. So that commitment to do a 15,000 square foot open space, I appreciate very much
[2:10:31]
again addressing the park. But it sounds like there might be a couple of items that could
[2:10:37]
be critical to some of the commissioners. I'm not sure what their thoughts are.
[2:10:41]
I'm happy to clarify that. I look forward to seeing how this intersects with the park.
[2:10:46]
But I believe it was both Commissioner Otwell and Fox that I think to me really stated
[2:10:51]
that while there a case can always perhaps be a little better on some of the details the core issues for me with respect to consistency with the comp plan are there and I'm comfortable supporting this project as is.
[2:11:07]
Other commissioners are there conditions that you wanted the applicant to consider or reconsider or are you ready to vote?
[2:11:21]
I think that this being the first time we're hearing about it it is an
[2:11:24]
opportunity for there to be other conditions added to this project just to
[2:11:29]
make sure that community and the council I mean the Commission is
[2:11:33]
comfortable with it. Do you have specific conditions that you would like?
[2:11:37]
No I actually was listening to what Commissioner Atwater was saying and I
[2:11:40]
agree with him about the height and making sure that getting out the
[2:11:45]
weeds of the height of the project but also the Commission is willing to
[2:11:49]
I'm sorry, but also if the Commission is willing to vote on this today, I'm willing to do that too.
[2:11:56]
Okay. So to be clear, would you like to have the applicant do something with that condition and bring it back to us?
[2:12:10]
I think if that's the only issue that's left on the table coming from me, I think that can be addressed in further conversations with Council.
[2:12:18]
I think that the benefit to the public, I think it's reasonable in the public interest.
[2:12:23]
There are no inconsistencies with this particular application.
[2:12:29]
Matthew did a great job spelling all that out.
[2:12:31]
It's hard to kind of argue with anything that he presented there.
[2:12:34]
I think we asked really good questions that staff were able to answer.
[2:12:39]
All that being said, I think I'm comfortable moving forward with the application as
[2:12:45]
it is and recommending approval.
[2:12:46]
In that case, I will entertain a motion. Commissioner Otwell.
[2:12:55]
With regards to Z-1225, I move to recommend adoption of the proposed consistency statement
[2:13:00]
dated August 12, 2025, contained in the agenda materials, and to recommend approval of
[2:13:05]
the zoning amendment.
[2:13:07]
Second.
[2:13:08]
Commissioner Otwell has made a motion for approval. Commissioner Fox has seconded the motion.
[2:13:13]
is there any further discussion? If not, all in favor? All opposed? Motion carries
[2:13:22]
9-0. Thank you all very much. Thank you to the public for coming out and
[2:13:27]
providing your comments.
[2:13:32]
That concludes new business. It's 11-15. Does anyone have
[2:13:37]
to leave like the next 15 minutes?
[2:13:42]
All right.
[2:13:50]
Next up, we'll wait for everyone
[2:13:54]
to leave.
[2:14:04]
Next up is the report of the chair. So welcome back everyone. It's
[2:14:11]
good to see you all. Just one reminder to use the Planning Commission email
[2:14:18]
address if you're going to be absent from a meeting because that copies
[2:14:24]
Bynam and Shanita so then everyone is in the know. I failed to announce at
[2:14:28]
the beginning of this meeting that Commissioner Shelburne had let us know he wouldn't be here.
[2:14:34]
So he is excused today. The other order of business is our committees. I believe I touched
[2:14:42]
base with all of you, either in person, we talked on the phone or I sent a text message.
[2:14:49]
Find them. Do you have this cheat for everybody? Okay. I am going to let you know.
[2:15:00]
Strategic planning, text change, infrastructure and mobility, which is fairly inactive unless
[2:15:05]
something specific comes up on that one. You'll be assigned to it, but that one rarely meets.
[2:15:11]
And then committee of the whole, as you know, is all of us. We'll get in touch with you about
[2:15:16]
when the committees will meet right now. Just note your assignment. Strategic planning.
[2:15:20]
Commissioner Miller is the Chair. The members are myself, Commissioner Burnett, Commissioner
[2:15:29]
Cochran, and Commissioner Shelburne. Text Change Committee, Chair is Commissioner Otwell.
[2:15:38]
Members are Commissioner Fox, Commissioners Neptune, O'Haver, and Omacaya.
[2:15:46]
Infrastructure
[2:15:47]
and Mobility. Chair is Commissioner Cochran. Members are commissioners Bennett, Neptune,
[2:15:56]
Omakaya, and Ottwell. And then again, Committee of the Whole is everyone. Find them. Do we
[2:16:05]
want to stick with the times that are set for right now? So I was going to say we'll
[2:16:11]
publish this information on the Planning Commission webpage. It'll also appear in
[2:16:16]
minutes next time as part of the direct the chairs report and then we do have set
[2:16:24]
standing times for all of the committee meetings and if you wanted to I can
[2:16:28]
stay with those that would be great okay so and then you make changes yeah
[2:16:35]
advise so strategic planning currently meets second Wednesday at four text
[2:16:43]
Change currently meets third Wednesday at four.
[2:16:49]
Infrastructure and mobility, which
[2:16:51]
again is inactive, meets fourth Thursday at three. Committee of the whole meets
[2:16:59]
fourth Thursday at four. So I'll leave it up to the chairs and the members if
[2:17:06]
you need to change those. If not, we'll stick with those standing times. I
[2:17:09]
believe the only committee that is set to meet this month is Committee of
[2:17:13]
the whole? Is it a text change committee? Oh, it's text change. I'm sorry. Text change.
[2:17:20]
And again, that's Commissioner Ottwell. So he'll be in touch with you all. Please let
[2:17:25]
your chair know if you will not be available for a committee meeting, because as you see,
[2:17:31]
those are much smaller. So it's important to have quorum.
[2:17:38]
And that is it for my report. We'll just go down the line for the report of the
[2:17:43]
members. Hi.
[2:17:47]
As noted committee of the whole generally meets the 4th Thursday of
[2:17:52]
the month which would have been September 25th however there are no
[2:17:56]
items. There's no items for August so we're projecting the September 25th as a
[2:18:01]
maybe. There may be an item but there are no items listed at this time. So no
[2:18:05]
August meeting. Thank you. I apologize I did no no August committee. No August
[2:18:10]
meeting. I did not announce that Commissioner Fox is chair of committee
[2:18:15]
of the whole as vice chair of the planning commission. I'm sorry, I apologize for the
[2:18:20]
slight. There's no slight, we're good. Commissioner Otwell. Thank you Chair Bennett
[2:18:27]
and to all the wonderful folks now on the text change committee we do have a
[2:18:31]
meeting coming up this month August 20th. It'll be in the Raleigh Municipal
[2:18:35]
Building Room 305. We're going to talk about RHDC updates and Greenway
[2:18:41]
amendments. Those are already on the portal so we can start reading about them.
[2:18:44]
I do want to offer a clarification. The RHDC text change will be in front of the
[2:18:52]
I'm sorry the preservation text change TC324 will be in front of RHDC on the
[2:18:57]
10th of September and won't come to text change committee until the 17th
[2:19:01]
but you will discuss Greenway TC325.
[2:19:06]
It's confusing because they're both TC3 from two different years.
[2:19:10]
Excellent. We look forward to having a Greenway discussion.
[2:19:14]
Do you want to try to get, see if you have quorum right now?
[2:19:17]
Does anybody know if they will be unavailable to meet at 4pm on
[2:19:22]
August 20th? I can confirm. Availability
[2:19:27]
on August 20th. 4 o'clock.
[2:19:31]
One more.
[2:19:32]
We only need three of the five.
[2:19:35]
I think you have three.
[2:19:36]
Oh, all right.
[2:19:39]
OK, Commissioner Neptune.
[2:19:41]
Thank you, Madam Chair.
[2:19:43]
Just a brief note of gratitude to our colleagues and staff.
[2:19:46]
Over the last month, I had the privilege
[2:19:48]
of working and coordinating with Bynum and Sarah,
[2:19:53]
I would say Shaughnessy, and others in our planning
[2:19:55]
and development department.
[2:19:57]
They came through with a city block building activity
[2:19:59]
for a larger public event involving our mayor and a conversation around growth and development
[2:20:04]
in the city. And I just really appreciated our colleagues and staff being there with
[2:20:08]
this block building activity. We also had colleagues from City Transportation who
[2:20:14]
were present, so I just, you know, won't recall everyone's names at this immediate
[2:20:20]
moment in time, but I'm deeply grateful for everybody who was present for the event
[2:20:23]
engaging with our larger public. So thank you to our colleagues on planning and development
[2:20:29]
and transportation staff. Deeply appreciate all of you.
[2:20:33]
Mr. Cochran?
[2:20:35]
I just wanted to say thank you for trusting me with the Infrastructure and Mobility Committee.
[2:20:39]
I look forward to maybe having a meeting this year and learning what it does.
[2:20:47]
No reports.
[2:20:51]
No reports, but I hope everybody had a great break. We had an awesome time at lunch,
[2:20:56]
which was wonderful. So I am glad I have had the opportunity to get a chance to
[2:21:00]
get to know the commissioners more and I look forward to more of those opportunities in the
[2:21:03]
future.
[2:21:04]
Commissioner Miller.
[2:21:07]
The Strategic Planning Committee has no items on the agenda to my knowledge and will not
[2:21:12]
meet in August.
[2:21:14]
And well done on the first, do you have a first meeting?
[2:21:17]
Thank you.
[2:21:18]
Thank you very much.
[2:21:20]
Commissioner O'Haver.
[2:21:23]
I always say I like to go last, but Blaney took my thunder on that one.
[2:21:28]
Nice job.
[2:21:29]
I'm unfortunately not available on the Planning Commission meeting on the 26th.
[2:21:36]
Email us for the record.
[2:21:42]
Now we will turn to the report of the Assistant Director.
[2:21:50]
You've all noticed we have a new agenda system.
[2:21:53]
Nice job jumping in the pool.
[2:21:55]
First meeting back. Appreciate you all rolling with it.
[2:22:01]
Busy meeting coming up on the 26th.
[2:22:03]
A lot of new business there.
[2:22:05]
expected and I don't think I have anything else. Thank you for your support.
[2:22:11]
I've done it on a first meeting. Thank you. Any other business?
[2:22:23]
Did you get an
[2:22:25]
email with the agenda? If you click on that link it'll take you to the agenda
[2:22:30]
and each case has a link. I can say a little bit more about the agenda if you
[2:22:36]
visit the council boards and agendas page which you all get a link to as I
[2:22:44]
understand it the planning commission distribution list is now working properly
[2:22:46]
for everyone who is appointed to the commission. Thank you IT. When you launch
[2:22:51]
that agenda there are blue titles and when you click on that on the right
[2:22:57]
hand side of the page you will see all the attachments pop up and you can see
[2:23:01]
like the staff presentation, the staff report, the engagement report. There are,
[2:23:09]
what else is there, so many pieces of business. Consistency statement for
[2:23:14]
approval or denial. So all those pieces would be there for you. You
[2:23:26]
can also get
[2:23:27]
there from the Planning Commission webpage if you visit RaleighNC.gov
[2:23:30]
slash planning dash commission Cassidy one of our helpful city clerks is here
[2:23:37]
and I think gonna show you a little demo while she's doing that I have a quick
[2:23:42]
question for staff is it Margaret Tartala in the audience I think it was I
[2:23:48]
just want to I just I recognize her I just I couldn't immediately remember
[2:23:51]
her name but our colleague I think from city transportation Margaret
[2:23:54]
Tartala was the one with us at this event with you know planning and
[2:23:58]
developments. I just want to recognize, I see her. And now I just remember your name.
[2:24:03]
So it's, again, thank you, Margaret Tartala, for being there with us.
[2:24:06]
Yeah.
[2:24:10]
I'm sorry, this is unplanned. But just for this, since this is new for the sake
[2:24:14]
of everybody, you'll see from the Planning Commission page there's a link to upcoming
[2:24:21]
Board and Commission meetings, which has agenda in minutes. As Planning Commission
[2:24:26]
is the first and only at this point board to be moved over to the new system.
[2:24:32]
It's the only one listed here and you will see PDF, HTML, the video which this is a good
[2:24:40]
example of the HTML which I would probably recommend if you're following along in the
[2:24:44]
meeting because it has the video over to the side after the fact you know that'll
[2:24:49]
be time stamps so people can click the item that they're interested in it will pull
[2:24:53]
up over to the side. If you click the item, as Bina mentioned, it'll list all the attachments
[2:25:00]
here that you can click. So this is the HTML view in my opinion is kind of the nice cohesive
[2:25:06]
view of everything. So not an e-scribe expert, but that's probably the best way to
[2:25:13]
call along. Thank you. Anything else? If not, we're adjourned.