[0:04]
All right, we are coming to order for our October 7th regular council meeting, and
[0:09]
as always, we're starting to pledge allegiance. All right, please, and Mary Anne,
[0:14]
will you please lead us? I pledge allegiance to the fight of the United States of
[0:20]
America and to the Republic for which it stands, my nation under God, indivisible
[0:27]
with liberty and justice for all.
[0:32]
All right.
[0:35]
Roll call. We have Councilperson James, Vice Mayor Pacheco, Councilperson Graham,
[0:40]
Councilperson Caseman, and myself, the mayor. All 5 of us present and accounted for.
[0:46]
Uh, we have 1 vacancy and is Jim participating remotely? Is he dialed in? Right there,
[0:52]
yeah. Jim, can you hear us?
[1:01]
Jim, can you hear us? I can
[1:07]
All right. Welcome to the meeting. Yes, I got. All right.
[1:14]
Um, So, uh, that, that does it for the roll call. We do have a quorum, um, action
[1:19]
item, um, we have, uh, an applicant for our vacancy from Sean Lloyd's resignation,
[1:27]
and, uh, I believe Trey is here tonight. Yes, and, and, and he is, I can tell he's
[1:33]
just raring to get. So, uh, is there a motion? Yeah, I move that the Round Hill Town
[1:40]
Council appoint Trey Worth to fill the unexpired term of Councilmember Sean Lloyd.
[1:47]
A special election is scheduled for November 2, 2027. Have to put that that far away.
[1:56]
After which the newly elected town council members will qualify for the office.
[2:04]
Is there a second? Is it really not until 2027? Yes, that's the next general election.
[2:10]
You just missed the deadline to get into this 10, OK. All right. So that was moved
[2:15]
by um uh Councilperson Graham and seconded by Vice Mayor Pacheco. The motion is to
[2:20]
appoint Trey Worth to the unexpired term of Sean Lloyd. Is there any discussions?
[2:26]
All right, this is a voice code. Paula James, I, Isaac Pacheco, I, Mary and Graham,
[2:31]
I, Beth Caseman, I. Jim, how do you vote?
[2:37]
I
[2:39]
Uh, Jim Walker, I, sorry, I didn't know that I could vote on, on live.
[2:46]
You can vote. All right then, uh, unanimously and Trey Worth is hereby appointed.
[2:58]
I'd like to invite you to come up to the table just getting the rest of the meeting.
[3:02]
You won't be able to vote for the remainder of the meeting because you haven't yet
[3:05]
been sworn. We have his son. Um, oh, the caucus is next.
[3:11]
I have to do that first, right, before you, Mr. May, I'm on your time. You do that
[3:16]
whenever you want. No, no, we'll, we'll let him participate. So let's go ahead with
[3:20]
the oath ceremony, OK.
[3:25]
It's really interesting because he's my, my neighbor that is so I I would get we
[3:30]
share a driveway. You might be hard on me. Are you tough on me? No, no, not at all.
[3:36]
There's no words that I don't know how to read, right? No, no. All you have to do
[3:40]
is repeat after me. Let's see. So we've got 3 copies of the oath, one for the town
[3:44]
clerk, one for Trey, and one for myself to take back. But before we do that, Say
[3:50]
a few words. Uh, Mr. Mayor, town council members, thank you for having me tonight.
[3:55]
Uh, very much appreciate what you all do. It makes our town run. I live here. I very
[3:59]
much appreciate it, so I thank you. Gary sent me with a few words, right?
[4:06]
Uh, dear Trey, thank you for seeking and accepting an opportunity to serve the town
[4:10]
of Round Hill. Your work and commitment to your role on the town council will contribute
[4:14]
to the success and sustainability of this wonderful community in Western Loudon.
[4:19]
I was preparing to attend the town council meeting and personally administrator,
[4:23]
administer your oath. Uh, but one of my dedicated deputy clerks, Mike Amos, advised
[4:29]
that you are his neighbor and a good friend. Given the connection you both share,
[4:33]
I'm delighted that Mike can administer your oath of office. As a resident of Brownville,
[4:38]
I know that Mike is honored to have this professional privilege. I am. As a former
[4:42]
resident of Hamilton, I'm quite fond of the Western Loudon. Uh, so never hesitate
[4:46]
to reach out if I can assist you while you serve your capacity of, uh, town of Round
[4:52]
Hill Councilman.
[4:55]
So now, Can you please raise your right hand.
[5:01]
I, Trey Worth, Trey Worth, do you solemnly swear, do you solemnly swear that I will
[5:05]
support the Constitution of the United States, that I will support the Constitution
[5:09]
of the United States and the Constitution of the Commonwealth of Virginia, and the
[5:12]
Constitution of the Commonwealth of Virginia, and that I will faithfully and impartially
[5:17]
and impartially discharge all the duties incumbent upon me. Discharge all the duties
[5:24]
incumbent upon me. Discharge all the duties incumbent upon me as a member of the
[5:28]
Round Hill Town Council, as a member of the Round Hill Town Council, according to
[5:32]
the best of my ability, according to the best of my ability. So help me God. So help
[5:35]
me God. All right, very good.
[5:41]
They signed in 555. All 3, all 3.
[5:56]
I
[6:00]
You know, gorilla, yes. It's hard sometimes, you know, you use the blackboard over
[6:06]
that.
[6:14]
And then if we could get my, yeah, I've got one for you. OK, I've got one for the
[6:19]
town. Thank you, and I've got one for me.
[6:25]
Say neighbors.
[6:30]
You
[6:32]
All right, thanks, Mike. Thank you, council members, Mr. Mayor. Thank you. Mike.
[6:36]
I'll be back to my seat and be quiet. Thank you, Mike. All right, now I said, yeah,
[6:42]
thank you everybody. Now you can participate and Trey, if you want the floor, I'll
[6:46]
give you a chance to make the opening remarks if you want to, but you're no pressure.
[6:49]
There will be council comments at the end of the evening. Uh, no comments right now.
[6:53]
I just appreciate everybody and the opportunity for this. Thank you so much. All
[6:58]
right, welcome aboard. Thank you. All right, we're gonna dive right into it. We got
[7:02]
a presentation now, Hayman Lane well exploration.
[7:07]
Peter's joining us. Hi Peter. Hey, good afternoon.
[7:12]
Can you hear me OK? Yes sir. Yes, yeah. Hi. Hi. Good evening. Good evening, council
[7:17]
members, Mr. Mayor, um, everybody, all staff, nice, nice to be with everybody this
[7:22]
evening, um. I'm trying to share my screen. Oh, I can send you a.
[7:40]
You can try now.
[7:46]
Are you able to see my slides here? Yes, yes.
[7:53]
I'm on this in presentation mode here. You have this via email as well, yeah, OK.
[8:00]
It will be on the um packet. Good. Um, well, good evening, everybody. Uh, uh, Harry
[8:08]
and Melissa asked me to come this evening to provide an update on the activities
[8:12]
we've been working on. Um, I, I thought, uh, for the benefit of those that may not
[8:17]
be as familiar, just take a quick step backwards to talk about how we arrived at
[8:22]
where we're at, where we're at, and what we're doing currently. Um, so before you
[8:26]
is a map, obviously of town, um, in the red dots that are around the town and within
[8:33]
town are the existing water supply wells that serve the town, such as the 21 NA wells
[8:38]
to the north, well D we put in a couple of years ago, 719, 22A, etc. and, um,
[8:47]
Uh, Stone Lee Wells off to the west, um. The other areas highlighted around here
[8:54]
are properties where we've done some exploration and Looked at a variety of opportunities
[9:00]
to develop to develop, uh, the goal here is to develop a new water supply well or
[9:04]
wells for the town to, to supplement the existing system and creates more redundancy.
[9:09]
That's what we're, that's our big picture goal here. And um we've looked at a few
[9:14]
options including, um, you know, the yellow highlighted properties on here. I won't
[9:18]
go into each one. We've done some exploration on those. There's some targets developed.
[9:26]
Uh, there's been a host of efforts in each of those, you know, has its place in the
[9:30]
exploration program. Uh, we met with the town council and reviewed a detailed plan
[9:37]
in 2025. In the summary that came out of that 2025 presentation and discussion with
[9:43]
the town council was, these are the bulleted items that we could take action on,
[9:48]
and we ultimately decided to move forward with one of these in earnest, uh, which
[9:52]
made good sense, but just wanted to kind of highlight these so we all kind of remember
[9:57]
where we were and then kind of where we're going. At the time, we talked about possibly
[10:02]
developing well C to the north, that, that has some work associated with it, possibly
[10:07]
well Simpson's Creek, Simpson's Creek, um, a well that's an existing well that we'll
[10:12]
talk about some more tonight. Beaman Lane is a property that's owned by the town
[10:17]
just on the west side of Slear Lake that present, presents some great opportunity
[10:22]
for developing a new source of supply. That's what our discussion will be about here
[10:26]
the rest of this evening. And then, uh, the other ones that we highlighted at that
[10:31]
time were possibly pursuing something on Yaton Lane, town-owned property, possibly
[10:37]
formulating a first right of refusal with the Hornings to develop water on their
[10:40]
property. Um, and then the last one was really to just try to work on these items
[10:45]
and others in parallel. But for good reason to put the, put the town's efforts in,
[10:50]
in, uh, dollars in one place and try to check one of these off and see if we can
[10:55]
get a, a new, an asset for the town on town-owned property, we've been focusing our
[11:01]
effort on the Hayman Lane property. Um, so what have we done out there? And I'm gonna
[11:07]
flip back and forth. Uh, after we were given the directive to proceed out there,
[11:12]
we had, we had developed, um, not developed, but we, we had conducted some geophysical
[11:17]
surveys on this property. Those are the blue lines here, and those resulted in identifying
[11:22]
two new test wells called R&D T1 and R&D T2. Just for folks that haven't seen these
[11:28]
profiles before, this is an electrical resistivity profile. It's a, it's kind of
[11:33]
an image of the subsurface of the ground. We're looking for fractured rock. So, T1
[11:38]
is a target that we're after. It looked like a good break in the rock. So we permitted
[11:43]
these through the state health department, the local health department. Um, that
[11:47]
process took several months. It was really very challenging and, and drawn out for
[11:53]
a variety of reasons, but nonetheless, we received the permits. The town created
[11:58]
access out to these for the drill rigs. That was a that was a really significant
[12:02]
process. Um T1 came in at 18 gallons a minute, not, not the highest yielding well
[12:10]
we're looking for, um. And, and provides us the, the information that um
[12:20]
For those that haven't been in discussions, well, Simpsons Creek is a well that was
[12:23]
drilled in the late 1980s. It's a 200+ gallon a minute well. It's never been hooked
[12:28]
up for some concerns about contamination, some concerns about its location, variety
[12:34]
of things. But this well is coming into foresight today because we have treatment
[12:38]
technologies. The town has an existing treatment. Um, there may be more treatment
[12:44]
available in the future. And the town now owns this parcel. They didn't previously
[12:48]
own that. So, You know, things look different in today's world than they did previously,
[12:53]
uh, when you got a 200 gallon minute well sitting here close to your system, um.
[12:58]
So we're able to use this, you know, T1 wasn't as favorable as we want, but we're
[13:02]
able to use that as leverage to go back to the health department and say, OK, you
[13:06]
know, we, we, we sort of didn't succeed here, but the value of these other wells
[13:11]
is coming forward, and we really need your support, uh, and, and backing to, to move
[13:17]
forward with these. We did not drill T2 to date, um, simply because we considered
[13:23]
a less favorable target. And, um, given the successes at T1, we didn't want to invest
[13:29]
any of the town's dollars there. It can always be drilled in the future if you wanted
[13:33]
to. But we just, based upon everything we've learned and where we're at, we didn't
[13:38]
think that was the best use of um resources at this time. Uh, well, 27A, you may
[13:46]
recall from our discussion back in 2025, had a bunch of junk in it. We found some,
[13:50]
we tried to run a video camera down there. There were sticks and all kinds of, uh,
[13:55]
stuff down in there. So you couldn't really do anything with it. While the drill
[13:57]
rig was on site. We flushed this well out. We cleaned it out, and the airlift yield,
[14:02]
that's the measurement from the drill rig at the time of drilling, was 80 to 100
[14:07]
gallons a minute. So really quite favorable. That's very good, um. So where we're
[14:14]
at today is um We proceeded in the background to contact the state health department
[14:20]
and say, OK, health department, we really need to move forward with 27A and Simpsons
[14:26]
Creek A for the town. You know, these are assets that they have, they're on town
[14:30]
property. Um, we need to get a site of site approval for these. And, and really,
[14:36]
it's a renewal of a very old permit from The 1980s. Originally, these wells were
[14:41]
drilled by developers for public water supply. Um, they've just been sitting for
[14:47]
a very long time. Uh, after numerous conversations with the state health department,
[14:53]
they've been very receptive to this. And as a matter of fact, came out, uh, I think
[14:57]
it's just about 2 weeks ago now. Uh, we got the, the county health department out
[15:01]
there in parallel with them. The conversations and meetings have all been had. I'm
[15:07]
told that the permits are forthcoming. I contacted them today and asked if we could,
[15:12]
if they could help me. obtain those so I could tell you tonight that I had them,
[15:17]
but unfortunately, that fell on deaf ears. Um. I'm just waiting for the paperwork.
[15:24]
I believe that we're on the edge of receiving well site approval letters for 27A
[15:30]
in Simpson's Creek A, which would really be pretty um great in today's landscape
[15:36]
of approving wells and locations. It's a, it's a real challenge, but we had the leverage
[15:40]
of Um, the, the T1 situation and where they are on town property, I think has provided
[15:48]
a lot of, um, you know, good, uh, support for that case. Um, so what do we need to
[15:56]
do with these wells once we get our approval letter? Um, I just wanted to, this is
[16:02]
a summary table we looked at previously. I well see on here, we don't talk about
[16:06]
that, but Simpsons Creek A well, the depth of this total depth of this well is 500
[16:13]
ft 503 ft deep. There are multiple water-bearing zones in this well. Some of the
[16:17]
water is quite deep, which we like, down to 200 and 300 ft. Uh, the airlift yield
[16:22]
at that time in 1988 was 217 gallons a minute and 27A. Um, although a good well has
[16:30]
a shallower fracture zone at 100 ft, but it will provide value, um, it does have
[16:36]
a, a, a deeper zone, but these two wells, we kind of, right now, our vision is that
[16:41]
they'll work together, um, on and off, but you know, we'll have to get through the
[16:46]
process.
[16:48]
Yeah The steps that are needed to go forward once the Well, the first step is to
[16:55]
finalize the permitting process with the, the state health department and the county
[16:59]
health department. I'm hoping that that will be concluded here very soon. Uh, well,
[17:05]
Simpson's Creek A is very old. The casings deteriorated. It's not usable in its current
[17:10]
state. It needs to be re-drilled and reconstructed. So there's a, there's a drilling
[17:16]
process there that needs to be gone through. Um, we would suggest running some borehole
[17:21]
geophysics down that well to understand where the fractures are, to help us determine
[17:25]
exactly where to move around that well with the rig. Um, there's limited availability
[17:29]
of space because of the steep slopes there. But we'll need some site preparation
[17:34]
work there from the town and then ultimately some well drilling. Then Assuming that
[17:41]
moves forward and the well is constructed favorably, um, You'll be ready to move
[17:46]
into a pumping test program and full water quality sampling to, you know, work towards
[17:52]
permitting this um for usage, you know, through the state health department and the
[17:56]
county. Um, and that's kind of the second two bullets is the pumping test. And we'll
[18:01]
have to make a decision once we get through the drilling, if we want to go with both
[18:05]
wells or one well. Um, and I don't think we're gonna clearly know the answer to that
[18:09]
until we get through that drilling process. Um, But right now, I thought, Jamie and
[18:15]
I have talked about this, Jamie Emery and I have talked about this extensively. We
[18:18]
believe probably the, the two wells make sense to go forward with, but we will have
[18:23]
that discussion with you, um, once we have all the information, then move forward
[18:28]
with the hydra study. Um, so as far as the cost of this, we believe that we have
[18:34]
an existing budget with you that had a series of line items. There's production wells
[18:38]
in there and test well drilling and, uh, pumping tests. We, we think that there's
[18:42]
probably enough money in there to cover most of what we just chatted about. Once
[18:46]
I get the letter from the health department, we can nail down the budget more closely.
[18:50]
But, um, There were some tasks in there that haven't been utilized, we would suggest
[18:55]
reallocating those to this and, you know, try to get these wells over the finish
[18:59]
line. So you have a source there on town property that you can hopefully use going
[19:05]
forward. And we, we do recommend continuing to try to allocate some, you know, dollars
[19:12]
annually to, to keep going with the groundwater exploration on these, some of these
[19:16]
other sites just because as we know it, it only gets harder going, going forward.
[19:22]
Um, went through that pretty quickly, but that's what I had for this evening. I,
[19:26]
I have backup information if there's something you wanna discuss or I have a couple,
[19:32]
I have a couple of questions for you, Peter. Yeah, sure, you talked about how technology
[19:36]
has advanced and how we have treatment options now to make the best use for the Simpsons
[19:41]
Creek, um, well, if that one is a high producing well, I imagine there would be some
[19:45]
type of infrastructure investment that's attached to that as well. Or were we talking
[19:50]
about like running that through Goose Creek and then our existing treatment facilities
[19:54]
would be enough for it, or Westlake. OK. Yeah, so I, I don't want to completely,
[20:01]
this is not my, uh, Keith. I wish Keith was on. Keith Lane is on this evening, but
[20:04]
what conceptually what we have talked about is, uh, my understanding is you have
[20:08]
a raw water line out, um, just on the main, main line here. So you could get the
[20:12]
water. It's a short run from whatever well we're using here out to your raw water
[20:16]
line, and that would head to your treatment plant that you have currently. And my
[20:21]
understanding is you have iron and manganese treatment. You had MTBE treatment. MTBE
[20:27]
was an issue out here in the past, but we tested this well two years ago, we didn't
[20:32]
see any MTBE, um, and I know in your other well, it's diminished over time. Correct
[20:38]
me if I'm, I'm sorry, go ahead. Pardon me, we detected PAS in this well, um. And
[20:46]
if I'm not mistaken, I believe you guys are moving towards PFAST treatment. So I
[20:52]
think that's what Keith talked about previously. So if you need treatment on this,
[20:56]
PFAST would be the concern. So you'd have to knock back. And, and again, this would
[21:00]
be a, a really a key question, um, but typically what you need to do is get the iron
[21:04]
and manganese back and then treat for the PFAST. Um, but the true levels of whatever,
[21:10]
whatever the PFAST is or is not in this well, so we had 27A was non-detected for
[21:14]
PFAST. There were several parameters in Simpson's Creek A, um, but that's at a low
[21:20]
pumping rate. We don't know what it's gonna be at the full capacity until we run
[21:24]
the tests. The other is just a clarification. What would preclude us exploring both
[21:29]
of these wells if we know that they produce at similar rates to what you all have
[21:33]
seen with the uh the airlift?
[21:37]
Uh Interference between them. There's interference drawdown, so one well might communicate
[21:43]
with the other. Even, even with interference, I think you're gonna want both of these
[21:48]
wells because right now the quality does look different and you may have a blending
[21:52]
opportunity here to, to reduce any, um, constituents of concern by blending the water.
[21:58]
That's a common practice. And you also have other wells, you know, if you bring this
[22:02]
over to your treatment plant, um, that's something you'd have to have like uh Keith
[22:05]
or somebody to look at closely, um. But you know, when you have assets like these
[22:12]
on town owned property, it's anything you can do to bring these forward to to us
[22:17]
makes good sense. Thanks. You answer my questions. Um, Peter, that chart that you,
[22:24]
uh, showed a little while ago. Could, could you send that to
[22:32]
Of Melissa so that it can be, yeah, that one, the table, yeah, absolutely, yeah,
[22:37]
I, I think usually we send in the slides after these presentations. Happy to do that.
[22:42]
Thank you. Yeah, and this, uh, the 1st 3, the top part of this is one of our previous
[22:47]
reports. The bottom well is the one we just drilled and we just tacked it on to,
[22:51]
excuse me, um, summarize the, the drilling of that well.
[22:58]
OK, thank you. You're welcome, Marianne.
[23:02]
I'm gonna ask a slightly unrelated question that Peter's not gonna be able to answer,
[23:06]
but I'm gonna put it to the town manager. The topic has come up in the past about
[23:11]
converting Hayman Lane to a public street. Is this potentially represent an opportunity
[23:17]
for us to reapproach the homeowners and see if there's consensus, whether they would
[23:22]
be willing to sign over to a public street that that might facilitate some of the
[23:27]
construction and easement work if we just had a right of way dedication. We've been
[23:32]
talking to him already kind of preliminary that because if we do put a well there,
[23:36]
if we are using the road regularly every day. That there'll be some opportunity for
[23:40]
road improvement. We shouldn't say what, right? That's the carrot, you know, the
[23:44]
carrot is if you guys do the right of way dedication, make it easier for us to develop
[23:47]
as well. We'll turn it into a public street and we'll keep it, you know, in better
[23:52]
condition, and then they're currently able to. That's kind of how we've been massaging
[23:56]
our, um, regular visit there lately was we had actually walked through people's yards.
[24:02]
To get to the well and we've the one you were like, well, you know this, this was
[24:06]
successful this, there's uh opportunity there for a mutual beneficial, um, opportunity.
[24:10]
So yeah, but we, we would need them to dedicate the right of way. I understand. Yeah,
[24:14]
so, so they would have to kind of all be in. Um, so I think if that, if, if, if they
[24:20]
know that road maintenance and shoveling snow is that is happening, they'll, I'm
[24:25]
sure they'll be excited. Yeah, so just maybe some some targeted outreach, some communication
[24:30]
with the residents there and just sort of assess the mood. How many houses are down
[24:35]
that road? 3. It's like 88 more than you would think, right? It looks tiny from,
[24:42]
it looks tiny from, but the thing is, it's like, um, we visit Wells every day, 365
[24:46]
days a year, so we have to be maintaining it, shoveling it, um, versus. We could
[24:53]
go years without missing the site before now. Mhm. OK, me and Harry, we're gonna
[24:59]
thanks. Really just see is there an opportunity. I don't think we don't require it
[25:04]
to make this project happen. It's just it could be a nice opportunity to get to your
[25:08]
it was all a long term, yeah.
[25:13]
Thank you, Peter. We really appreciate it. Yeah, thanks, Peter. Thank you. Yeah,
[25:16]
you're welcome. We should, you know, we just got to get over the permitting here
[25:19]
and then we can talk in earnest about making the rest of it happen. Thank you very
[25:26]
much, Peter. Welcome. Have a good evening. Thank you. Hi. All right. Um, and now
[25:33]
we have esteemed guests from the Ohio County Sheriff's Office. I'd like to give them
[25:37]
the opportunity to have, have the floor. I think the topic is e-bikes and this updated
[25:41]
traffic safety information. You're, you're doing,
[25:50]
I love you. Appreciate you guys. Um, so I know you guys have some of the pamphlets
[25:55]
here for these. I brought in another stack. So you guys keep a bunch in stock. So
[25:58]
I'll give that to you. And then we also had these made up recently. If you guys want
[26:02]
to take one of these and pass them around. It's kind of a summary difference between
[26:06]
um e-bikes, mopeds, and motorcycles. Oh, I think I got this 10, this is good. Before
[26:10]
I dive too much down this rabbit hole, is there any specific questions that you guys
[26:14]
have regarding e-bikes application enforcement, anything along those lines that I
[26:20]
can answer upfront? Here's a question. So I have a middle schooler over in Percyville
[26:26]
Middle School. I think I remember the PE teachers saying that you all are doing training
[26:31]
of middle schoolers at some point this year on e-bike safety. Is that something I'm
[26:36]
remembering correctly? Yes, so we tend to coordinate on a semi-regular basis with
[26:40]
the, with LCPS, the public school system, as far as their bike safety days go. They
[26:44]
tend to reach out to, um, to me or, um, Deputy Gerbin, the traffic deputy. He intends
[26:49]
to do a lot of the bike stuff within, uh, our district. Um, I haven't had anybody
[26:55]
reach out to me recently. Um, so if they are wanting to do one, I'd be more than
[26:59]
happy to come to the school and set something up so we can have one. Before it gets
[27:04]
too cold out. So, so currently there aren't regularly scheduled trainings in the
[27:10]
school system in Loudoun County around this issue, correct? OK, OK. Is there discussion
[27:15]
of having such because it's the kids themselves that, um, are often pushing the limits
[27:22]
between, so, so, uh, that is one of, I mean, we can handle this from a regulatory
[27:30]
and, you know, town perspective, but As we've all discussed, there's Rules you can
[27:36]
put in place and and education but without the kids themselves knowing what the limits
[27:42]
are and having those limits set by both town and parents um well that in lies the
[27:48]
the biggest crux of the whole issue with these e-bikes fundamentally is it's, it's
[27:52]
less so an issue of enforcement and more so an issue of education in a lot of circumstances
[27:58]
because what we've seen is, um, these parents don't really know what they're getting
[28:04]
their kids. a lot of cases, they don't know the class of e-bike they're getting them.
[28:07]
They don't know if it's an e-bike or a moped or an e-dirt bike. They're just the
[28:11]
kids are coming to them and saying, hey, this is what we want to get because all
[28:13]
my friends have them. And so they're buying them for them, not really understanding
[28:17]
the scope and the requirements that go along with them. Um, as far as going back
[28:22]
on with the schools, um, most of those are going to have to be coordinated from the
[28:26]
schools initially. Um, we can do some outreach with them to try and facilitate setting
[28:30]
them up more regularly, but I don't think we have anything that Progressing that
[28:35]
I'm aware of as far as like a regular and consistent schedule on, on the e-bike education
[28:40]
side. So, um,
[28:45]
Should they be driving on the sidewalks or the road? So it depends, um, and I hate
[28:51]
to give that answer, but the way e-bikes work is they have the same accessibility
[28:57]
and operational ability as a regular bicycle does being operated on the highway.
[29:02]
So the uh uh cyclists, like a competitive cyclist or someone who just uses it for
[29:07]
exercise, they're obligated to follow all the major traffic rules like a vehicle
[29:11]
is when they're operating a bike on the roadway. That same thing applies to e-bikes.
[29:15]
There's no, there's no specific laws in place saying that an e-bike can't be on a
[29:21]
road. Much in the same way, there's certain areas that say you can't have any form
[29:25]
of bicycle on a sidewalk whatsoever. It just kind of depends on the community and
[29:30]
the laws they have in place and the regulations they have in place for um location
[29:34]
by location. If that makes sense and answers that. Yeah, the bicycles, um, e-bikes,
[29:41]
they can be on the sidewalks and on the streets. Um, there's 3 classes of them. So
[29:44]
they're, they're going to be regulated. Uh, um, as far as regulations, but as far
[29:49]
as like access to the streets and sidewalks, they can be on both. Are you all running
[29:53]
into issues where there's a pretty gray line between what these classes are, because
[29:57]
I see like one-wheeled, uh, unicycles that go 40 miles an hour and skateboards that
[30:02]
people can control with a remote that goes 30 miles an hour. So it's like. It's all
[30:06]
over the place a little bit with these things. Before I came to Louder actually,
[30:11]
I worked for the town of Herndon, and we had 22, individuals that lived in Reston
[30:15]
and commuted into Herndon, and one of them had a longboard that he would ride, but
[30:19]
he rode on the WNOD, um, so his wasn't as much of an issue. But then we had another
[30:22]
gentleman. He had one of those motorized unicycles, and he would, he would come into
[30:27]
town and go to his work and he'd go home and he just follow the traffic law sites
[30:31]
as if he were a bicycle. So. Um, oh, you would do it in the road. Yes, ma'am, yep,
[30:37]
um, as far as the, the differentiation between the classes. Um, they're pretty structured.
[30:44]
Since 2021, there's been a set standard that manufacturers have to maintain as far
[30:49]
as labeling of the bikes and including all the class information on them. All, you
[30:54]
know, all e-bikes are required to be under a certain wattage, 750 watts. Anything
[30:58]
over that, it can push it either into an electric moped or into an electric dirt
[31:03]
bike. Um, and that there's a top speed that's regulated on those as well by class,
[31:08]
as well as the, the, the type of Um, acceleration that it used. Class 1 and class
[31:12]
2 are both pedal assisted, meaning the only way that that bike, the only way that
[31:16]
that motor is engaged is if the subject, the riders actively pedaling. But a class
[31:20]
2 has a throttle, um, like a moped or a dirt bike or, or one of some other form of
[31:25]
electronically assisted device. There's actually in the, the unicycles, the one wheels,
[31:30]
those type of things actually fall into a slightly separate category. If you look
[31:33]
through the um the laws that the state has on the books and our county ordinance
[31:38]
forum. So there's like 4 separate Categories now and then you have the classes of
[31:43]
e-bikes within those because I think that like e-bike is an oversimplification of
[31:48]
the issue because what we're seeing is kids on motorized vehicles going really fast
[31:52]
and a lot of times in roadways and ultimately it's a safety issue, right? We don't
[31:56]
want them to get hit by one of these horse trailers coming out of a new cut and then
[32:00]
have a tragedy on our hands like we've seen. Thankfully, out here on the West End,
[32:03]
we have not seen a significant increase in um e-bike complaints coming to the sheriff's
[32:08]
office. It's less than 1% in the last quarter. Um, where we're seeing it the most
[32:12]
is more heavily populated congested areas. Ashburn, I think, has a 44% increase in
[32:17]
complaints and Sterling is behind them at almost 30%. It's like 26 or 27%. Um, and
[32:24]
so obviously, that's where we're seeing a lot of these issues more is in those, those
[32:27]
more densely semi-urban populated areas as opposed to out here. Um, we do get complaints
[32:32]
somewhat regularly for them on the WOD and it's usually just people driving too fast
[32:36]
and someone will call it in. Um, but those are, those are harder to find because
[32:40]
we, you have to be kind of in the area when they come out the door to take any sort
[32:44]
of enforcement. Um, I know myself and one The other deputies that Spike certified,
[32:48]
we got a complaint that came in and we hit the WOD and we rode all the way from Personville
[32:53]
down to 9 and back just looking for people on them and we didn't have any problems
[32:57]
that day we were out. So it's really hard to find those because you got to be there
[33:01]
when it happens. So did you have a question for me? Well, I'm just saying the pictures
[33:06]
here are a little, in my opinion, misleading just Because you're not seeing a lot
[33:09]
of those type of e-bikes, you're seeing the ones that really look like little motorcycles,
[33:14]
right? So there are less than more than likely those are electric dirt bikes. I,
[33:19]
I would, I've seen the ones you talk about. We had a, we had an incident with personal
[33:23]
PDR park in front of the store, which ones are they? We had a couple of kids on them
[33:28]
at Percival at one of the schools. After an event and we walk up and it's clearly
[33:32]
a dirt bike like there's no pedals it's got a throttle system it's got a key, but
[33:36]
it's electric it's not gas so, so that then they fall in the moped category. No,
[33:41]
they fall in well, and this is where it gets gray because it's like you got to look
[33:45]
at the wattage on the on the bike itself whether because an e-motorcycle has to be
[33:49]
above. 1500 watts. So there's like this weird gray area where between 750 and 1500,
[33:55]
well, is it an e-dirt bike? Is it an e-bike? Is it a moped? So there's kind of a
[34:00]
weird area in that space that's Again, if, if we get somebody that's online, it looks
[34:05]
like it, we can go through and, you know, figure out, check the label and see what
[34:08]
it's what it's categorized as that opens up whether we have enforcement action as
[34:13]
far as it needing to be registered and needing to have lights and needing to have
[34:15]
a helmet, things like that. So do most of those dirt bikes need to be registered?
[34:19]
Yes, yes, OK, any dirt bike that's ridden on. The highway has to be registered title
[34:24]
and insured just like a standard motorcycle does. Um, I'm sure we've all seen people
[34:28]
who own dirt bikes that have them appropriately registered and they ride them around.
[34:32]
Um, it's the same parallel as those. It's just a different style of motorcycle. Do
[34:37]
they need a driver's license too? Yes, and it has to have a motorcycle endorsement.
[34:41]
The only exception to that is going to be using them on private property. So if they're
[34:44]
out here in the hills, you know, their buddies's property riding around, obviously,
[34:47]
you don't have to have it for that. But if they're on the roadway operating on the
[34:50]
highway, then they have to have a motorcycle endorsement and a valid license. So
[34:54]
and that separates it different from mopeds, because mopeds, you don't have to have
[34:57]
a license to drive, but you can't have a suspended status, and you have to take a
[35:00]
moped course. So There's layers of this that just add complexity, and it doesn't
[35:06]
help that every time we turn around there's a new e-bike coming out or new electronically
[35:11]
propelled device that these kids are riding around on because I've seen, I've seen,
[35:14]
um, like a scooter thing. They just stand on it and then they, it looks like a, I
[35:19]
guess, um, skateboard with a handle. Yes, yeah, we see a lot of those. They're very
[35:22]
popular because they're a lot, um. They're very easy to ride. They're easy to learn.
[35:27]
They're not as expensive as a standard e-bike is. You can get them for 80 to 150
[35:31]
bucks, and depending on where you get them from, yeah, um, and they're the kids love
[35:36]
them, and that's, that's the biggest. The biggest downside to all this is the kids
[35:40]
love these things. Um, and the unfortunate side of that is they're not having the
[35:45]
education like you were pointing out to, to understand that, OK, you can write these
[35:49]
and you can ride these, and these can be a great tool for you to get to school or
[35:52]
around town, ride around with your friends. But at the end of the day, you have to
[35:55]
be understanding of the rules that are in place for their safety. On top of everything
[36:01]
else, the traffic, yes, it gets them out of the house or something, yeah, yeah, I,
[36:06]
I, I mean, and I get it out here too, like we want the kids to be out. and doing
[36:10]
stuff and not in front of screens. I, I just want them to be safe too. And I assume
[36:14]
that like no matter how licensed you are, and if you follow these, you're not supposed
[36:17]
to be doing wheelies down the middle of the road regardless of what that would fall
[36:22]
under a type of reckless behavior, um, because you're, you're posing inherent risk
[36:26]
to yourself and others and other vehicles and riders on the roadway. So there's an
[36:30]
articulation for recklessness in that behavior. Um, same thing with like we get a
[36:33]
call for all time from people when we're doing donuts, you know, it's, yeah, we've
[36:37]
all done it. Yeah, it's cool, but at the end of the day, it's, it's reckless in nature,
[36:40]
right? So that's, that, that's where it ties back into the education side of things.
[36:44]
So what are you guys saying that's successful in like mitigating this? Like, are
[36:47]
you not going to give kids tickets and that's gonna sink in? Like how, how are you
[36:51]
seeing success in this right now? I think it ties back to education, and this is
[36:56]
somewhat unfortunate, but I think also the, the The real world examples of what happens
[37:02]
when you don't, I think are a little bit more unfortunately impactful. Because if
[37:07]
they're, if their friend's on an e-bike and gets waffled, it's not like it's, it
[37:11]
causes a pretty big impact for walking. Um, and it's, it's, we had a case in Sterling
[37:18]
a few months ago now where uh uh we had a juvenile driver of a car hit an adult rider
[37:24]
on an e-bike who ran a stop sign and wasn't paying attention. So like the shock factor
[37:29]
in that for that kid I'm sure will probably keep him off the e-bike forever. But
[37:35]
there's, it all ties back to educating as much as we can because I'm sure you guys
[37:39]
are all familiar like trying to teach kids anything nowadays is extremely difficult
[37:43]
and and get it to stick and get them to actually apply. I had two teenagers, right,
[37:47]
so you know exactly what I'm talking about, right? Like, oh Dad, you don't know what
[37:51]
I'm talking about. We're just out here riding around. Well, yes and no. So, um, there's
[37:56]
a couple other things that, that each class deals into as far as like helmet requirements,
[38:01]
um, a class 3 e-bike because it tops out at almost 30 miles an hour. Those ones you're
[38:06]
required to be, you're, you, if you're under 15, you have to be riding with an adult.
[38:12]
Now, how is that enforceable? Like, oh, that kid looks like he's 14. I'm not, I'm
[38:17]
not getting into that, you know, kind of a trick bag of dealing with that stuff.
[38:21]
But, you know, at the end of the day, the enforcement side of things, particularly
[38:26]
with juveniles, is somewhat less effective than education and particularly education
[38:31]
of their parents. Um, because we see that on the court side with, with juveniles
[38:34]
for, for a lot of things. Um, is there anything that towns or municipalities are
[38:38]
doing on the code side that's like reinforcing the work that you all are doing from
[38:42]
the enforcement side to like be synergistic. So like, hey, if we had this code, it
[38:46]
helps us to do our job better and keep the, you know, kids safe. The, the county
[38:50]
has the helmet. That's all on the county side, yeah. So as far as the, the, the ordinances
[38:54]
go, that, that'd be on the county side, um, I, I think as Deputy Phelps said, the
[38:58]
enforcement, um, follows the education, and if there's a bike that's been modified
[39:04]
and it's going 35 miles per over or 35 MPH, it's a motorcycle. It's, it's a motor.
[39:10]
Vehicle, so, um, they should be licensed, right? You can't license a 12 year old,
[39:16]
a 13-year-old, or 14-year-old, but the parents, the key to this is the parents being
[39:19]
involved in knowing what their kids have because ultimately if they're allowing their
[39:23]
kid on, on a, on a, on a motorized vehicle that's called an e-bike that's going 35,
[39:29]
40 MPH, they're allowing the kid. To drive a motorized vehicle, right? And so there,
[39:34]
there is, uh, um, statutory enforcement on that, um, in, in regard to that, allowing
[39:40]
an unlicensed person to drive, right? So the, the key here is first education, making
[39:44]
sure everyone's aware, um, and then enforcement does follow in some circumstances,
[39:49]
but, um, uh, we want people to be safe. First and foremost, and the parents to be
[39:54]
aware of what their kids are driving. Because we're not seeing anything as far as
[39:58]
like adults or people who have been cycling for a long time who do opt to get an
[40:02]
e-bike or an e-motorcycle. We're not seeing an issue with those people, right? It's,
[40:05]
it's almost exclusively with the, the juvenile and young adult population that isn't
[40:10]
thinking about, you know, Oh, I can get my e-bike towed because I'm riding it without
[40:15]
a motorcycle endorsement or without a helmet or, you know, being underneath, right?
[40:19]
They're not thinking about anything, right? So they're thinking about getting to
[40:21]
a friend's house, get in the park or going home, right? It's, it's, it's, it's, so
[40:25]
it's, it's again, it's like all thing, it's like all tools, right? They serve a purpose
[40:28]
and they're good if used under the right circumstances, but we just have to try and
[40:31]
figure out Getting enough outreach and education with the families in order to try
[40:37]
and get these kids to understand the scope of what they're doing and, and how impactful
[40:41]
it can be if they're not writing correctly and appropriately. So.
[40:46]
So you guys help with uh uh pushing out the information sharing with those linked
[40:50]
to the sheriff's office website where there's all that is broken down as we both
[40:55]
explained. So the more you guys can assist with with helping push that out for the
[40:59]
education aspect is appreciated. And if there's ever any more of those you guys need,
[41:02]
just let me know. I can bring them in. We have a plethora of them. Um, we have some
[41:05]
more of the yard signs and stuff, um, up at our PIO office so I can snag some and
[41:09]
bring some down, um, if you guys want to hand them out to whoever wants to put them
[41:12]
up, and I can follow up with both Harmony and Bloombridge Middle. I, I do think that
[41:17]
education in the schools is going to be really critical. I mean, our kids don't know
[41:22]
that if they're going 35 miles an hour, they're far more likely to be killed in an
[41:27]
accident than if they were going 20. And they also, even if they don't own any bike,
[41:32]
they're. Their friend owns an e-bike and or a or a motorcycle or a moped or whatever
[41:38]
it is and they're getting on it because it's super cool and they can go really fast
[41:42]
and so I'm if they have one but when they get one yeah thank you yeah absolutely
[41:48]
any other questions from anybody about this um. I have a question. Yes, if, well,
[41:55]
I don't live here, but we see the same kind of kids ride by all the time. Do you
[41:58]
know where they lived? Are we allowed to say there's a kid that lives in that house
[42:03]
that comes out right here? Would you go knock on their door? Yeah, probably no, I
[42:06]
don't think it's too much. I think it just kind of depends, um, on the deputy that
[42:10]
gets dispatched to. how they're going to handle it. Um, it's, it's something where
[42:16]
If it's a continuing complaint and it's starting to become an issue, whether that's
[42:19]
an issue with traffic or pedestrians or, or just general safety, um, it's never a
[42:24]
problem to say, hey, this kid lives, this is where we think he lives, this is the
[42:27]
issue that we're seeing, you know, if, if, especially if it's somebody that we can
[42:31]
develop a good relationship with, with the parents and address it like, hey, listen.
[42:35]
Your kid's not in trouble here. We're not trying to jam anybody up or have anybody
[42:38]
up. But these are some things that are being told to us about what what's being seen
[42:42]
in town. And we're trying to get ahead of any possible injuries, um, or any accidents
[42:48]
that, that your kid may receive as a result of not understanding kind of the scope
[42:53]
of what he's doing on. And that has been working here. Uh, one of your guys that
[42:57]
sits on the corner over here, uh, has developed a really good relationship with one
[43:01]
of the kids in our neighborhood who was riding all the time, was never wearing a
[43:03]
helmet, was bombing down the hill, and now he wears his helmet. He'd learned how
[43:07]
to signal now when he's just because you guys are talking to him and it's like, Hey
[43:11]
buddy, you gotta have that helmet on your head. So it's like there's some incremental
[43:15]
steps to safety. So yeah, appreciate it. Yeah, for sure. Thank you for coming. Yeah,
[43:20]
definitely.
[43:22]
Oh thank you. Thank you. Thank you. All right, well, you guys, it's been a pleasure.
[43:25]
Um, obviously you can reach out to me if you guys need anything else or anything
[43:28]
at all. I'm just up the road and be more than happy to help out. So thank you very
[43:31]
much. Thank you.
[43:34]
Thank you.
[43:37]
I have a really easy start. Next up is public comment. Anyone from the public wishes
[43:44]
to address the council at this time? If we have some
[43:50]
Anybody online? Yeah, my leisures, OK. I will close public comment then and we will
[43:58]
uh have the uh agenda. I move that the meeting agenda be adopted as presented. 2.
[44:05]
All right. So moved by Vice Mayor Pacheco, seconded by Councilor Preston Graham.
[44:08]
Any discussion of the agenda?
[44:12]
All right, hearing none. Paula, Paula Genzai. You don't have to vote tonight. You
[44:19]
can vote tonight. You can sworn. You swore in, so you couldn't tell you were sworn.
[44:24]
I didn't realize you were getting sworn tonight as well. OK, got you.
[44:32]
All right. Agenda is approved and milestone first vote. I want to say Harry a lot
[44:40]
of things around to make sure that the swearing could be tonight. Yeah, I wasn't
[44:44]
expecting that at all, so I apologize for the confusion, but I didn't expect that
[44:48]
you'd be able to get sworn tonight. Harry's magical. I didn't realize how connected
[44:51]
you were. Oh, you didn't ask Jim. You know a guy. I know, we know a guy. I
[45:00]
all right.
[45:03]
He's friends with my chicken. All right, it's been disapproved. 60 and uh disclosures.
[45:09]
Does anybody have any disclosures for the account? on items that may be on the agenda
[45:13]
tonight.
[45:16]
All right. Hearing no disclosures, we'll move to approval of the minutes. First,
[45:20]
we only got one set tonight, September 16th. Are there any corrections to September
[45:25]
16th? They have been edited, yes. I do have one additional change that I caught earlier
[45:31]
today, and that's line 22, uh, to add Logan's um title which is planning and GIS
[45:38]
intern. No, his title This title from the from which meaning?
[45:46]
This is the September 16th title is um. Infrastructure and asset technician. He's
[45:53]
no longer an intern. OK, I'll get that from you. Sorry.
[46:00]
All right. Other than clarifying Logan's And there was also an edit made that's been
[46:07]
That's reflected in what the council is looking at tonight. OK, then we don't need
[46:10]
to call that out. Any corrections from the council?
[46:16]
All right then, is, is there a motion to adopt the minutes with the one correction
[46:21]
to Logan's title? So moved. Is there a second? Second. All right, moved by Vice Mayor
[46:26]
Pacheco, seconded by Councilperson Caseman. Motions to adopt the September 16th minutes
[46:31]
with the correction noted in the discussion. Any discussion of that motion? Hearing
[46:38]
none. Paula, Paula, James, I. Trey Worth, I, I, I, I, Jim. Hi
[46:47]
Just so you know, Trey Paula, cer certain votes are required to be voice votes where
[46:52]
you have to say your name before you vote. I just say other ones you don't. Paula,
[46:58]
it likes to just do it always. OK. You, you can choose your own style if you don't
[47:03]
have to do your own thing. I will call for a voice vote when you have to actually
[47:08]
voice your name before you vote, but it's up to you entirely. This is my personality,
[47:13]
you know, once we get to. All right. Motion carries and minutes are approved. Next
[47:17]
item on the agenda, we have two business items. First is a financial report which
[47:21]
was gonna be presented tonight, I believe, which we have handouts.
[47:27]
It is our first,
[47:30]
yeah, um. Cooper's gonna be my backup. So, um, caveat, this is our first, so it's
[47:38]
a child mind. It's a, it's modeled off of first of those. Um, I'm gonna run through
[47:43]
it and then there's gonna be some background to add to it that's separate. So the
[47:48]
separate part will be down at the bottom talking about committed funds, but I wanna
[47:52]
talk about that separately, go through the financial report and then talk. So, this
[47:56]
is as of August 31st, our financial standing. Um, that date is because we close the
[48:03]
books out, we get it straight in September. So, your next meeting you'll see as of
[48:08]
September, end of September and then going forward. To me it's all about trends for
[48:13]
the council. This isn't the audit, this isn't the official books. This is more for
[48:18]
you to see overall where we're standing in a snapshot in time. So whatever the date
[48:22]
is, this is a snapshot, um.
[48:27]
There's two lines. We have one checking account and as of that day, August 31st,
[48:33]
we had $155,000 in the bank account. Um, if you look down to, uh, where it says negative
[48:40]
for utility fund, that was just because at that moment we had just paid something
[48:43]
that day. So if you look the next day, it would look different. Um, so also the utility
[48:50]
fund and the general fund are in one checking account. So it's just a ledger, yeah,
[48:55]
it's, there's 100,000 155 in the bank. It just happened it said negative 339, um.
[49:03]
Moving on, the, the Virginia investment pool is um
[49:10]
Where we have our, um, it's a liquid fund. It's not in the long term 3 to 5 year
[49:16]
fund or it's where we can pull it down within 24 hours. The interest rate at that
[49:21]
time was 3.8185. Um, and our earnings per month for the month of August was 5700.
[49:29]
Um We've talked about moving the investments into longer term, but we have to get
[49:36]
through the audit, the rate study, and kind of understand where our projects are
[49:39]
before we commit them, because once we commit them, it has, we have to know we're
[49:41]
not gonna touch it for this is super helpful for that though. I like that. Thank
[49:45]
you. So yeah, if anybody has comments, we're gonna keep improving upon it, but we
[49:49]
felt like this at least gets the conversation started, um, so does that committed
[49:54]
include some of the reserves that were talked about in financial policy or not?
[50:00]
OK, that is a long term question that I'm still trying to learn. I'm gonna, I'm gonna
[50:04]
go over the committee list separately after I get the rest of the report. We can,
[50:07]
we can sneak up on this one. I, I, I've had Bobby explain to you about 10 times and
[50:12]
I'm still confused. Um, meals tax revenue, um, this is.
[50:20]
Uh, meal tax based on July revenues collected in August and there's no comparison
[50:27]
because we were not collecting last year, OK, so there's no change to, um, which
[50:33]
one is on the 2nd, is it on the 2nd? It's right here up at the top compared to the
[50:39]
previous year. OK, thank you. So, um, now if you add up two months of collections,
[50:46]
that's $9,366 and the budget was about $45,000. So at this point we're on track and
[50:53]
that doesn't include two more restaurants opening up this fiscal year. Um, so who
[50:58]
knows where we'll end up. Sales tax, again. Um I told staff not to worry about
[51:06]
the actual date or when the bills come. It's just more snapshots. We're just looking
[51:10]
at what we collect. It, um, As of August for sales tax and how we are
[51:18]
tracking um so far in the budget. Um, So, as you can see, we've already
[51:26]
collected more than the previous year. I, I think I told um Cathy going forward I
[51:31]
just want to show what was collected in that in that month and not try to there's
[51:36]
a weirdness about the two months explain sales tax. You did it how much longer after
[51:41]
so it's, it's 2 months in arrears and so because it's distributed to the county and
[51:47]
then has to come to us because from the state to the county then the assistance so
[51:52]
it. You're really looking way better, yeah, so, but once it gets, we get the pattern
[51:57]
rolling, it, it'll. It'll be easier to track. It would because I mean the money that
[52:02]
we're booking in June was, was accrued in April or May. Yeah, OK, so that's
[52:10]
why this was August. We, we collected this money in August. But it was 14 months
[52:16]
prior. So ultimately this will be normalized where whatever we're seeing we just
[52:20]
understand is that monthly exactly what I, yeah, so I actually had wanted to just
[52:24]
say August so that this wasn't confusing. We'll work on it. I tend to prefer the
[52:28]
cash method, but the auditors keep telling us that telling me that's wrong. Well,
[52:33]
this is so I, I claimed this document. Bobby has the audit. I have the monthly report.
[52:37]
Um, what I told staff was the goal of this report is. You just wanna know how the
[52:43]
economy is doing. This is just a feel, a feel-good thing, you know, um, it's ultimately
[52:48]
a good thing, but how's the meals tax going? Oh, there must be something going in
[52:51]
the economy because it's down from last year. What's going on with our restaurants?
[52:55]
We reach out to our restaurants, ask if they need anything. Sales tax going down
[52:59]
because the economy is changing. As we go into budget, we need to reconsider, um,
[53:04]
to raise real estate tax. Um, business license is more difficult because it's once
[53:10]
a year. We collect only. Well, there's always new businesses, but our big time is
[53:15]
March. That's when business licenses are due. Um, some do trickle in over time, like
[53:20]
today we had a new contractor had to apply for a business license. Uh, so that's
[53:24]
why it's, it's, it's, you'll see more after March for business license. Can I ask
[53:30]
you what, um, is this the first year that we, I thought last year we had, um, um,
[53:35]
meal tax, meal tax, meal tax originally meal tax officially started January 2026.
[53:42]
You voted on it, but then we had you started in January, but why isn't there January
[53:47]
numbers for the previous year? Oh, because it's July. You didn't put it down. Oh
[53:52]
yeah. Um So, utility bills, uh, this is easier to explain.
[54:01]
So we bill every month and um Compared to the budget, we're on track. One of the
[54:07]
things to notice is active accounts. Why does it say 98% active accounts? If you
[54:12]
have Um, maybe you're taking an extended leave in Africa for a year for work and
[54:18]
you don't need your water and we'll turn it off. Your, your account now is inactive,
[54:22]
but you'd still eventually pay a maintenance fee, a minimum maintenance fee, but
[54:26]
it's not an active account, so it's harder to track like usage, um, because you're
[54:31]
not gonna be using that 140 gallons a day.
[54:35]
Um, so overall, we, um, We do really good with collections lately, because it's really
[54:43]
on top of it. I think we have very few payment plans. Um, and ever since we started
[54:49]
going to Neptune 360 having that real time telling people they have a leak. We don't
[54:55]
really get requests for leak adjustments either because like right away we're telling
[54:58]
you we see something weird so can we add um availabilities to one of these reports?
[55:03]
Yeah, thank you.
[55:11]
I can comment that it works very good. I got a report yesterday actually, and I only
[55:16]
see my kids half the time because they're with my ex and so they take long showers
[55:20]
because they're teenagers and their long showers prompt that. Um, did you set a threshold
[55:25]
it triggered as a leak, but I was like, what's going on? I looked around the house,
[55:31]
nothing was, you know, and I, and I looked at the time because it's specific in the
[55:35]
time and it was their showers. So I will be discussing.
[55:41]
Big brother's watching you. That's right. They go on deaf ears. Um, it's really exciting
[55:47]
to see that 2 360 coming to fruition because before it was bills were every other
[55:53]
month and you only knew when the bill came through and then you get sicker shock
[55:57]
which you had a week for almost six weeks so. So going back, Zoom have questions
[56:04]
on this. If you have ways to approve it or questions, we, we'll keep making it pretty,
[56:07]
but we wanted to start with the low bar. That's, you did it the right. You want to
[56:11]
start simple, something you know you can maintain, and then you got to keep us from
[56:15]
making it more complicated. That was my instruction to staff. So thank you for noticing,
[56:19]
um. The next part of my conversation is, is kind of a combination of talking about
[56:24]
the financial report, kicking off the strategic retreat, talking about the loan,
[56:28]
talking about where we are with capital projects. I made a cheat sheet here. It's
[56:33]
the long sheet, and you also have the original um utility budget. Bear with me while
[56:37]
I explain this because it's a little complicated. Um, what I was trying to capture
[56:42]
was When you look at the utility budget, you know, you will appropriate money in
[56:50]
a given fiscal year. Maybe the project doesn't. We only have one of those forms,
[56:53]
by the way. We have, we have this one. We don't have that one. That's fine. You don't
[56:56]
need to see it, but it's complicated. If you had this, it actually make it worse.
[56:59]
But when you, when you adopt the budget. Um, you're appropriating money thinking
[57:04]
that project's gonna get done that year or that it's gonna cost that much money and
[57:09]
some, and then we've learned that it takes 2 years for VO to approve a water line
[57:13]
and it rolls over or When we first initiated a project like the chlorination at Stoneleigh,
[57:20]
we thought it was gonna cost 320, now it's gonna cost 600, because as you go through
[57:24]
30%, 60%, 90% design, the costs go up. So let's put the budget aside for a second
[57:29]
and just focus on what the town has already committed to, be it a signed contract,
[57:35]
you've put it in writing to the federal government for a key FOS application, or
[57:39]
you've already committed to it by strategic vote or how we've already had conversations.
[57:45]
So, I'm going to show you what money is committed this fiscal year before July 1
[57:52]
and why staff is recommending a loan now to get all this work done. So the first
[57:58]
thing on the list is the Ermont Water Line construction. This is new money. This
[58:03]
is not money being spent. This is not appropriate. This is money, you know, this
[58:06]
is what we think right now we have to spend $850,000 to build the Ermont Water Line.
[58:12]
We're preparing to go to bid. Construction will happen in the spring.
[58:17]
The construction started to happen before the Evening Star Water tank rehab. Next
[58:23]
on the list is 117,000. That's the remaining amount of money that needs to be spent
[58:28]
to rehab the Evening Star tank. That will happen after the Erm water line. So in
[58:35]
actuality, it's probably gonna happen in September, September 27th, which is fiscal
[58:39]
year 28, but I'm still showing it to you because it's money that's gonna be spent
[58:43]
in the next year. Yeah.
[58:48]
Um, just clarify, we have fully sent all the previous loan. Yeah, don't worry about
[58:53]
that. OK, so, OK, go with me on this. So I'm sorry Melissa, just pause that 117 is
[59:01]
that to finish the end the rehab, the whole rehab, the painting, OK, the painting's
[59:07]
already paid for. This is, this is trying to catch, uh, sorry. So the inside the
[59:13]
tank has to be painted. We have already prepaid for that years ago, but we couldn't
[59:18]
pull the trigger because the tank has to be turned off and drained. We couldn't turn
[59:22]
it off and drain it till the Airmont tank was built, so it drove the conversation.
[59:28]
So now that it's constructed we can prepare to do the rehab. The missing piece is
[59:32]
the water line in between because it's undersized and under the highway. So the goal
[59:36]
is to build the new water line first, then turn on the tank. OK, so bear with me
[59:43]
on this. I've looked at this like. So this is only money that we have already committed
[59:50]
to spend in the next 18, I'll say 18 months to be gracious, but mostly this year.
[59:55]
Um, Eveningstar Water Treatment Plant Engineering. The town has signed a contract
[1:00:00]
for $343,000 to engineer the Eveningstar Water Treatment Plant. That is a signed
[1:00:06]
contract, so I put that in the committed bucket. Um, this doesn't include the fact
[1:00:11]
that the county has given us money for, uh, 3.5 for engineering. We in a town still
[1:00:18]
have to spend 1.1 on construction, give or take, because we really don't have the
[1:00:22]
final number. This number could change since we're just starting engineering. You
[1:00:27]
will see a preliminary ending report in the next bit of time that could have a higher
[1:00:31]
or lower number, but we're targeting right now 4.6.
[1:00:38]
So, just put in the back of your mind 1.1 million is a future cost in the next three
[1:00:43]
years that we haven't yet decided how to pay for. There is An application traveling
[1:00:49]
through Congress that we put in for 700,000, but we have no sense of when that's
[1:00:55]
going to be approved. So we don't even show that.
[1:01:00]
We talked to Peter tonight and he was talking about how we still have remaining money
[1:01:03]
left over in the contract we signed for EGGI to study the wells. So it's about, I
[1:01:08]
think it's 75,000 is the remaining amount. I have to check. But it's a contract we
[1:01:12]
signed to have EGGI find us a well. So it's committed because we signed it, so it's
[1:01:18]
money to be spent this year. Then after that, if you look into the future, I kind
[1:01:25]
of arbitrarily put 1.5 for FY 30. It's, you'll have to decide during the strategic
[1:01:30]
retreat when you want to actually build the wealth. Where, where do you put the 1.5
[1:01:35]
in the next 5 to 10 years?
[1:01:38]
Stoney well coordination system upgrade, Trey, that's important because that's a
[1:01:42]
safety issue right now. Staff are going into these vaults that are very tight under
[1:01:46]
150 PSI pressure to do their work on the wells, and the coordination is only treated
[1:01:52]
at one well. And it kind of cycles floods through, but when that well is off, so
[1:01:57]
it's not being chlorinated. This project will connect all the wells, travel to the
[1:02:02]
existing building there, treat it for chlorine. Staff will not have to go into the
[1:02:07]
vault because all the work will be done in the house. So it's, it's half safety,
[1:02:11]
half health. We had budgeted 320 3 years ago. The the final numbers came in
[1:02:18]
90% ready to go to bed. It's at 6:30. So how do we reduce that delta in the future,
[1:02:26]
right? Like between what they tell us it might cost and what it ultimately costs
[1:02:29]
because it ends up being meaningless when it's that much different. Yeah, along the
[1:02:33]
way, I think this is something that um could have been fixed along the way at 30,
[1:02:37]
60, 90. They usually do give you like Shelby with Southern Greenway we knew it was
[1:02:43]
traveling through this just was uh. I'll blame myself that I didn't catch it sooner.
[1:02:49]
I, I just think it would help, especially when we're looking at these big long lists
[1:02:52]
of numbers that will, how do we budget this? How do we put this there? I'm like,
[1:02:56]
OK, that's gonna be about 250. That makes sense to me, but then it ends up being
[1:02:59]
800. Like it's just a whole scale different. Yeah, so originally I, I show in the
[1:03:04]
budget that I put, um. It's only I put in a lower number at 144 and this is here
[1:03:10]
I put 400. I was surprised with the 620, but I understand. We'll probably do a better
[1:03:16]
job alone. 30 include the 2:30. No, I think it's already the
[1:03:24]
new number. Oh, I wrote 230 is the more. So in the budget you have 400. So the staff
[1:03:30]
will have to come back to you with the budget amendment for that when it's time to
[1:03:33]
spend the money. We'll have to erase that. Um, and Melissa, is this, are these kinds
[1:03:38]
of increases just as a result of I mean, obviously there's just inflation and things
[1:03:44]
along those lines. They're discovering new things as they engineer the project or
[1:03:49]
or begin to explore it, but are we standardly setting in, you know, not to exceed
[1:03:55]
clauses or clauses, and what can we be doing? So we have a, not to, this one's a
[1:04:02]
complicated one because it's not like other projects. It originally was under Keith
[1:04:05]
laying under Keaton Ports, and he originally was only going to widen the bolt. So
[1:04:11]
you still have to go into the vault. You still have the coordination problem. That
[1:04:15]
original number came from the 2023 rape study where we just put a bogey in. It actually
[1:04:20]
had not been engineered. There was no PER. Yes, OK. So one of the things that we've
[1:04:26]
implemented now that we didn't do before was guesses. We really were doing back in
[1:04:30]
the nap. It was like you go to Keith Lane and say how much we go, uh, and literally
[1:04:35]
go this number. Bowman. Only gives you numbers with a preliminary engineering report.
[1:04:42]
That shows the cost and it will say FY 26 numbers FY 27 FY 28. It will show escalation.
[1:04:50]
So it's just a matter of changing how we do business. So yes, we were guessing now
[1:04:54]
we don't guess anymore. This was one of the last we're still guessing. Well,
[1:05:00]
we should clarify that. Sorry, I apologize. We have somebody else guessing right
[1:05:04]
now. No, we need to have more and more informed guessing. It goes from like literally
[1:05:08]
like that Keith Keith Blaine would literally give me a, a. A sheet of paper with
[1:05:13]
a little budget. Bowman gives me a 10 page report with pictures and numbers and a
[1:05:18]
chart. Yeah, but they also they charge to predict the future remaining. I am trying
[1:05:24]
to use more paper to predict more of this. Yeah, what's the difference in charging
[1:05:28]
though that napkin, how much would that cost? $20 and the other one costs $10,000.
[1:05:33]
And there's a difference in the estimates too, because we're paying for paying for
[1:05:37]
the estimates. Yeah, we're paying for the estimates and they're different prices
[1:05:40]
too, right? That's very true, right. So just to clarify for myself, um, so these
[1:05:46]
numbers are accounting or including the county grant for Evening Star.
[1:05:54]
It, it will, will this, the only thing on here is the engineering, right? You got,
[1:05:59]
I see for Union Star you got 340 and then 1.1, but in the comment. You say county
[1:06:04]
grant for 33.5. So that's why I was trying to focus on what we're spending in the
[1:06:09]
blue column. So the total cost of Evening Star plan will be 4.6. That's a guess,
[1:06:15]
4.6. The county has um obligated 3. 5 Now did they, is that already approved or is
[1:06:23]
that just it's in the budget it's in the it's approved well. So that one's approved.
[1:06:28]
That one's they've already voted on it. And are we getting that in all at once, or
[1:06:32]
are we getting that spread over 3 years? 3 years. It's engineering half half. OK,
[1:06:38]
and using the estimate of 4.6, that means it's with 1.1. OK. The engineering probably
[1:06:45]
will get wrapped up and get reimbursed to us. And then what are we planning to submit
[1:06:50]
to them this coming spring? So I think it's still gonna be under the old regime.
[1:06:55]
What are we, what are we asking for this round? So this round you're only on currently
[1:06:59]
as of August you can only ask for existing projects. They just approved that now.
[1:07:04]
You'd be literally turning around six weeks later and saying, Can I have more? OK,
[1:07:07]
so basically we're just gonna say, please follow through on your previous promise.
[1:07:11]
The 3.5% is in the budget. OK, but we're not gonna, we're gonna ask them to fund
[1:07:14]
their current, their current plan. Yes, but we're not gonna come in. We're not coming
[1:07:18]
back because in our request we said we're paying for our portion. We said we're paying
[1:07:22]
for 20%. Well, I didn't mean for eating. I just meant in general. Then we have some
[1:07:25]
other ideas. Well, Southern Greenway is something that we're reading so right now
[1:07:28]
we're asking for Southern Greenway. OK, that's what I want to clarify. So but they
[1:07:31]
might have some money for that. So the CIP funding request is on every other year
[1:07:35]
cycle of. I need more. It's funny. Water transportation. Here's, here's the answer
[1:07:41]
to your question. The county is so used to engineering projects costing more every
[1:07:45]
year. Every other year is, OK, how much more did it cost? What's the amendment that
[1:07:49]
you need, and not a new project. So we actually had a meeting yesterday. We had a
[1:07:55]
meeting with the county yesterday because they wanted to know why Southern Greenway
[1:07:58]
costs so much more, and Shelby had to go through line by line and explain, Well,
[1:08:02]
we're building a retaining wall. We're going under the bridge. We're going under
[1:08:05]
the highway. Everybody mark your calendar. Tuesday is when it's going to Loudon County
[1:08:11]
Finance Committee. If you want to speak during public comment for the Southern Greenway,
[1:08:14]
that's when you do it. Next Tuesday, this coming up Tuesday. Yes, I will be coming
[1:08:19]
back from BML, so I will miss it. But last time I waited till 11:30 p.m. and they
[1:08:23]
never got a chance to talk. So I would recommend talking public comment, not wait
[1:08:27]
for the agenda to come. So you're saying next this coming Tuesday. They've already
[1:08:32]
given us money though for the Southern Greenway, haven't they? Yes, this is additional.
[1:08:37]
How much have they given 2. 30. We're asking for 1.3. 2.3.
[1:08:45]
OK. And is that in committee or is that in the board finance committee Tuesday. Finance
[1:08:50]
Committee Tuesday. OK. So anybody who would like to speak out in favor of this other
[1:08:53]
greenway, you couldn't speak during. Cooper will check how it works. Well, you have
[1:08:57]
to, you, well, I actually, I've never spoken to committee. I've always spoken. I
[1:09:01]
don't know if you can or can't. I don't think, I don't think you're allowed. I don't
[1:09:04]
think you take public comment. Is it, is it an open session or not? Yeah, I will
[1:09:08]
find out. It has to be open session. Oh, it is open session. I sat there before,
[1:09:11]
but they don't, they don't take that. I take comment. I'll check. We will find out.
[1:09:16]
I can just sit there and glower or smile, depending on our growing sign, smile. be
[1:09:22]
there to answer questions, but you know if they have any, I feel confident, to be
[1:09:27]
honest, if you want to go and see how it works, if you don't go, I'm sure it's fine
[1:09:30]
because we spoke to, do you remember Mark Hoffman? So Mark Hoffman was assigned to
[1:09:36]
us yesterday to find out why it costs more, and we went through the entire thing
[1:09:39]
because he's the one speaking on our behalf on Tuesday. So he helped us build meetings.
[1:09:45]
He's really good, yeah. He laughed about his daughter being one. Both our daughters
[1:09:51]
were one when we started the V Street project. Yeah, you can go and make facial expression.
[1:09:57]
It'd be interesting to see the process if if it's open. That's neat. So how it works
[1:10:01]
is Everybody's made funding requests and the finance team review it and that um it's
[1:10:07]
more difficult for the water sewer projects because The Eastern Island supervisors
[1:10:12]
going, why are you? This one should be pretty easy because it's, it's transportation,
[1:10:16]
so. OK Where was it? We're going through the stoneleigh chlorination so
[1:10:24]
cost more and I apologize, but um I'll do 11. It's been a long day, Isaac, um,
[1:10:32]
about the difference in money. We'll find a way to better track it along the way.
[1:10:37]
Why is it so much more, you know, than the budget? OK, because again it was an estimate.
[1:10:43]
It was an estimate. And so what happens is We have to put in the CIP plan at least
[1:10:49]
a placeholder. At the same time, you're paying for the engineering to to fully flush
[1:10:53]
it out. And so it just depends on When I did the numbers along the way.
[1:11:01]
We'll make sure that we do a better job going forward. All right, so, um, you're,
[1:11:06]
you're asking the council to Essentially authorized to start seeking a loan. You,
[1:11:12]
you had a number in mind for the loan. Well, let me finish getting you haven't gone
[1:11:17]
through everything,
[1:11:19]
so this is just, I'm just hold off on the loan for a second. That's a separate. So
[1:11:23]
50,000 for the truck, 84,000 into your remaining. This is educational. As a reminder,
[1:11:28]
you only authorized 30% design of this donate pressure zone. So we have about 84,000
[1:11:35]
left on that contract. And then during the strategic retreat, the council has to
[1:11:40]
decide when you're going to pull the trigger on full design so that we can then take
[1:11:44]
that full design and carry that through to ask for the 2.5 million. I thought we
[1:11:50]
were going to be taking this initial amount. I just said that yeah, yeah, you have
[1:11:54]
to you have to make. So the, so the, my point is that if you have to vote on, do
[1:12:00]
you want to take 30%, 60%, 90%, You have to, what does your application package look
[1:12:07]
like to take to the county because the more shovel ready it is, It It's um
[1:12:15]
it carries more weight but with this one in particular it's the county's input that
[1:12:19]
we need more than than our. Skin in the game for it. So this one is a long term.
[1:12:25]
It's not your typical CIP project because it's it's educational, it's storytelling.
[1:12:31]
It's, it's not gonna be we need to start calling it the stonely ticking time system
[1:12:36]
like give it a like I wanted to avoid that term, but do we have an engineering report
[1:12:44]
from Bowman right now. They're doing it right now. That's the 30%.
[1:12:52]
So Bowman's doing like 6 capital projects for us right now. So, um, so.
[1:13:00]
OK. We have to be cautious how we talk about the Sony project because we have to
[1:13:07]
separate it from the county's overall goal to help us with the utility system and
[1:13:13]
you don't want them to think. That this is your next. You learn how to keep it separate
[1:13:19]
like, yes, we need help overall with repair replacement and funding and projects
[1:13:23]
still needs its own special entity over here because otherwise that will become your
[1:13:27]
next big chunk. I think that can be part of the upcoming retreat because I think
[1:13:30]
we need to have a longer discussion about how to frame that and how to discuss it
[1:13:34]
with the county because we keep coming back to it, but I, I don't disagree with you.
[1:13:37]
I'm just saying like that's a longer discussion. I think we're gonna, I think we're
[1:13:40]
going to be coming in with a big ask for the county for that one, and we need to,
[1:13:43]
they don't want a special tax district. For it because that's the only other way
[1:13:47]
it's going to be possible to even start to chop away at the cost for that. So yeah,
[1:13:51]
and so I love still did it. It works. It's a special way to do it, but that's nice
[1:13:56]
conversation. That's why I don't want to spend half a million designing something
[1:14:00]
that we're not going to pay the construction cost on here, here. So we need to like.
[1:14:06]
We need to sort of lay it out. We're putting up 83 this year to sort of flesh it
[1:14:10]
out, the concept plan, understand the scope of the problem. But at that point, I
[1:14:15]
think we need to have a strong conversation with the county about what, what does
[1:14:19]
the county think is the way forward if we, if, if they take their time on this Western
[1:14:25]
lab and water study, it'll be not just this year, it'll probably be the year after
[1:14:30]
coming spring. They'll still be under the old system. And so if, if this year is
[1:14:35]
gonna be the trail, then maybe next year we're coming around and we're gonna make
[1:14:41]
our ask for Stoneleigh at that point. So to, to, to, to let you know how the the
[1:14:45]
plan currently is at the
[1:14:49]
It kind of wants to put in the FY 29 budget, which is gonna be drafted next summer.
[1:14:55]
The results of the race study or the the study that and our right their study, not
[1:15:01]
ours so I will have to feel out the county because from the county's angle they're
[1:15:05]
gonna be like, well, we gave you 5 for the water tower, 4 for Evening Star, and then
[1:15:11]
3. I, I understand all of this that Stoney is a whole separate thing and I think
[1:15:16]
it needs to be I was like I don't see us asking next summer. I, I, well yeah, the
[1:15:22]
county is gonna be just as. next summer as they are right now. Um, but for the purpose
[1:15:27]
of the strike $84,000 is what we owe today. $84,000 is all we're spending today.
[1:15:32]
Um, $100,000 to do the new water line in Hill Circle that is committed. The contract
[1:15:38]
signed. The construction team is mobilizing, um, so that is a going forward project,
[1:15:44]
yeah. So let me go on down to the PFOS, the two PFOS treatment projects, it's in
[1:15:49]
red. The construction's in red to show. We've applied for it. If they say no, you
[1:15:56]
have to decide what you want to do next. So is the grant going to pay for the engineering
[1:16:00]
or just the construction? The engineer, the construction, the engineering is the
[1:16:05]
committed part we're paying for in our application. We said we'd pay for these two
[1:16:09]
numbers. OK, so we said we would pay. It was like. 10% or 15% and then they they
[1:16:14]
would pay the construction cost. Are we fronting that engineering cost or are we
[1:16:20]
waiting to hear back on the grant? We're fronting it to make it go faster, make what
[1:16:24]
go faster the process because we have to be done by 29. We will, we're, we're starting
[1:16:29]
engineering. Yeah, I, I think we need to have, I mean, we talked about this some
[1:16:34]
with Shelby last time, um, I think it was Shelby that we talked about Bowman, Bowman,
[1:16:39]
that's right, sorry, um,
[1:16:43]
I think we should talk about this during the strategic planning session. Because,
[1:16:48]
um, Even a year ago, that 2029 date was something that was moving to the right. I
[1:16:55]
know it hasn't officially moved to the right yet, but it was in motion to the right.
[1:16:59]
And so I think other localities are planning for 2031 now. So I want to kind of understand
[1:17:06]
Should we be still planning for 2029 or should we be planning for 2031? So I'll give
[1:17:09]
my three second opinion right now is that if everyone across the country is trying
[1:17:13]
to be P5 settlings, the equipment to do the work is going to be on backorder or out
[1:17:18]
of order or you want to be the first orders and to prove that you need. You're, you're
[1:17:25]
asking for an extension. It's, it's not that they're moving the date, it's the ability
[1:17:29]
to ask for an extension. So we won't know until 2029 if we got approved for the extension.
[1:17:34]
So we have to show progress that we're moving towards it. So we could be six months
[1:17:40]
behind schedule, 9 months behind schedule, and they would give us grace, but we can't
[1:17:44]
be like, well, we didn't start because we didn't know, so. I, I, the other thing
[1:17:49]
about the 718 project is it's also solving the issue about the well in the backyard.
[1:17:55]
So it's a twofold project, um. But that is my opinion. That grant, just as a reminder,
[1:18:03]
uh, we'll find out in December. Is that right? OK. That was the same question. When
[1:18:09]
do we know about that? Federal state Grants are a little more political when they
[1:18:16]
have they have programs. I don't know, but we have a good chance. So Hooper's helping
[1:18:21]
make a running list of things for the retreat that we'll be talking about. Speaking
[1:18:26]
of things to discuss earlier treat the west, the uh the the water line under the
[1:18:30]
lake, um, we're, we've we're moving forward on permitting, engineering, acquisition,
[1:18:36]
but not construction because the council has pushed pause on it. But for the purposes
[1:18:40]
of the rate study, we have to pick a year that you're going to pull the trigger on
[1:18:44]
it so we can plan for it. So it is something you could include in the loan because
[1:18:50]
the loan can be a 3-year loan. So it doesn't have to be something you're gonna do
[1:18:53]
this year, next year, the following year, but right now I don't know where to put
[1:18:57]
it in the CIP. So do we have enough other projects that would, we could use to justify
[1:19:02]
the loan? Yeah, it's everything in that first column. So yeah, so yeah, I'd say let's,
[1:19:06]
let's not, let's not commit to it on the loan package loan application if we're not
[1:19:11]
sure about it. If we have other things we can use to justify the loan, right? And
[1:19:14]
so the order of operations, so. Um, OK, let's pause for a second. This number here,
[1:19:20]
the, the last part is the loan payment, and that is $500,000. The check has already
[1:19:26]
been cut. It, it's already been sent in the mail, but as of this report, as of August
[1:19:33]
30 person hadn't been cut. Does that make sense? So that number is $500,000 less.
[1:19:38]
So, um, that's where the 3 point, if you look at the sheet over here for overall
[1:19:42]
building status, it says that 3 point. 3,065,000 is committed. That matches the chart
[1:19:50]
I just showed you.
[1:19:54]
On the bottom. Yeah. So Our preliminary off the bat request for the
[1:20:02]
loan is mine's that loan payment so the the new line would be 500,000 be 2. Um
[1:20:10]
And on the general fund side, that is committed general fund projects that you would
[1:20:14]
see on the general fund approved budget. That includes propers and the remaining
[1:20:18]
portion of um the transportation proper as well. We can go over that later. But the
[1:20:24]
focus of the utility conversation is It all is layered. It's talking about the financial
[1:20:29]
report, what's committed, what's committed to pay cash this year. The council's interested
[1:20:34]
in a loan. We don't have to pay cash. I had a meeting with Davenport, Kyle from Davenport
[1:20:39]
on Monday to discuss our chances for a loan, and he said that the loan last time
[1:20:45]
went smoothly because we were going through the rate study. Uh, who was here for
[1:20:50]
that. It was like the budget was being improved, the rates were being improved, the
[1:20:54]
rates were being improved all at the same time. So our package to uh perspective
[1:20:59]
banks made this look very, um, appealing, you know, we have a plan in place, we have
[1:21:04]
a way to pay for it. So he said that he wants to, he recommends we wait for the rate
[1:21:10]
study. To be completed and the audit to be completed, so that's about December. And
[1:21:15]
then they can look at helping us in January, February get the loan. It takes about
[1:21:19]
60 days, which lines up perfectly with um Largely Ermont, Wyoming, but he's he's
[1:21:26]
Thinking bank placement we're not looking at uh the revolving water condor or any
[1:21:30]
other things like that. I didn't want to do the snap again, so I have to meet with
[1:21:33]
them again, um, but I just got preliminary, you know, he just said we have to look
[1:21:37]
creditworthy and As a refresher, what can you give a definition of the snap loan?
[1:21:45]
Is it, is it have certain requirements, or is it state like that? It was a very simple
[1:21:49]
process. It was just we had a list of utility projects and if we decided not to do
[1:21:54]
one of those, we just had to send it nothing. We're gonna do this project instead,
[1:21:58]
and we had 3 years to spend the money or we lost the interest accrued. So they give
[1:22:03]
us the money. It goes to the bank. We make interest. We can keep the interest, maybe
[1:22:07]
spend it within 3 years. OK, thanks.
[1:22:11]
So, Melissa, with the rate study, and I know that's a whole separate conversation,
[1:22:16]
but we just had a mini conversation about Stoneleigh. Is that having, so those potential
[1:22:24]
costs that we hope the county will cover. Are those being incorporated into the rate
[1:22:31]
study as part of our conversation that's a strategic um you know since she brought
[1:22:38]
up the rate study, um, at the last meeting. Uh, Scott requested an update for him
[1:22:45]
on how far the race study is going. So have you had that update? No, no, no, but
[1:22:53]
I hadn't had an opportunity. I just asked for a meeting to get caught up and so,
[1:22:57]
so this conversation is what's holding up the race study, this, this decision, because
[1:23:01]
I can't make these. I can, I can give them bogeys. I can give them guesses, but I
[1:23:06]
feel more comfortable with a little more. I mean, a rating model can have scenarios
[1:23:10]
in it. You can have a scenario that has 1.5 and one has 2.5 and one that has 4. So
[1:23:16]
the, the question they're asking is what is your 5 year CIP? What's your 10 year
[1:23:20]
CIP now to be. To be upfront and say, well, there's a chance we might pay cash.
[1:23:28]
In 10 years, 2.5%, you know, it, there's a model that shows that versus we have the
[1:23:33]
county pay for it, so we can't assume the county's gonna give us the money. So you
[1:23:37]
have, but you have to, but there's also a model where like we talked about, there's
[1:23:41]
a special tax district where, and it's not coming out of the broad consumer base
[1:23:46]
to pay for and a good rate model will have unspecified in it and we can just say,
[1:23:50]
well, it's part of the unspecified, so it helps. All I'm saying is that I would feel
[1:23:56]
better if I can give bogeys like I did here, you know, I'm just kind of place where
[1:24:00]
I think it would be. And so getting feedback from your helps when I give it to the,
[1:24:05]
the Lake City people about, well, we wanna, we do want to move forward on the lake
[1:24:08]
to lake water line or we don't want to move forward on the lake to lake water line.
[1:24:12]
Yeah, I just, I don't think that the council will have the information. To make that
[1:24:18]
sort of decision. Even after, even at the strategic planning session, we're really,
[1:24:24]
we're really setting up a conversation that's gonna be When the rape model comes
[1:24:29]
up. And they say, well, here's your 20% scenario, and here's your 10% scenario, and
[1:24:34]
here's what you're giving up for each scenario. That's when we will have a better
[1:24:39]
conversation. Yeah, but here, nor there, I still have to submit everything to the,
[1:24:43]
the, the rate study people. I've already, you know, I'm already having those conversations.
[1:24:46]
I just wanna make sure that we have this conversation again at the retreat where
[1:24:50]
I don't feel like I'm telling you what to do and you're telling me what you wanna
[1:24:52]
do. Yeah, I mean, a good rate study will have scenarios, and, and to me the, the
[1:24:57]
CIP list. I think what we can do in the strategic plan section is help you rank them
[1:25:06]
and so that, so that you know, OK, well I've got this dotted line that's moving up
[1:25:10]
the bottom of the CIP list and you know, well, if you put the line here that it's
[1:25:15]
this much of a rate increase, you put the line here and it's this much of a rate
[1:25:18]
increase and hopefully the rate model will allow us to do this sorts of scenarios
[1:25:22]
once it's ready. So one of the questions is what are your CIP lists is gonna be paid
[1:25:26]
for by a loan. So I'm just gonna use the list that I am gonna recommend. I think,
[1:25:30]
I think you should, I mean, that's just part of our financial plan. Our fiscal policy
[1:25:34]
right now is to fund long term capital improvements with loans. And so I, I think
[1:25:39]
it's perfectly normal to say, look, we're gonna pursue a bank placement in January
[1:25:43]
even if we don't know whether it's a 1 million or a 3 million, um, you know, that
[1:25:49]
will sort of play out during the rate study. Um, but I think we've got too much capital
[1:25:55]
that we've already committed to that we pretty much have to be playing alone. So
[1:26:00]
yeah, it's, it's a busy time for Scott because that is a great story. We should move
[1:26:06]
in.
[1:26:08]
I'm sure we will all be informed. It's going to require intensive discussion. They're,
[1:26:16]
they're only, there's, there's nothing to be talked about race right now because
[1:26:18]
all they're doing is collecting data, so they have a long wish list. There's like,
[1:26:22]
where's our data and I'm like, I'm trying to get it to you. That's what's happening.
[1:26:25]
So, um, to Scott's point, are, are we talking about incorporating these sort of different
[1:26:29]
scenarios? Yeah, that's because I, I think it would actually be informative and useful
[1:26:34]
to have the what if, uh, the town had to pay out of the utility coffer for this massive
[1:26:40]
CIP project because I think that would create political will to moving, you know,
[1:26:46]
that forward. So that logic, that's why it's important to have your CIP show that
[1:26:49]
you are paying cash for it. So it does get and then that's how the potential reimbursement
[1:26:55]
of some of that stuff. Well, I was gonna say is that's how the water tower came to
[1:26:58]
us because we put the water tower in as we were paying for it. It produced we were
[1:27:03]
gonna build it regardless, right? It produced a rate that drew attention. The county
[1:27:06]
came and said, what's going on? So yeah, so we, we were building that water tower
[1:27:10]
and you also have to remember that the county's kicking off their exact same study
[1:27:13]
in December to look at the exact same things, the exact same scenario, so. We will
[1:27:19]
be telling them, hey, we have to go with Stoneleigh, and they're gonna have to put
[1:27:21]
that into their mind. So it is a wild time to be here because I was telling staff,
[1:27:27]
I was like, I've got the audit, the rate study, the county study, the bank loan study.
[1:27:36]
And the budget is coming around a bit. You're going to be very knowledgeable about
[1:27:41]
all of this. It's all in my head. So anyway, so I, I'm not gonna give you this every
[1:27:48]
time, but I wanted to unders I, to me, I'm not an auditor. I don't understand a lot
[1:27:53]
of things about fund balance and trial balance, but I wanted the committed number
[1:27:57]
because that meant the most to me so that you don't see, you know, $4 million in
[1:28:02]
the bank and think you're $4 million in the bank because you've already committed
[1:28:04]
to $3 million. So, um, I hope this is helpful. But just, just for the
[1:28:12]
council's reference, I, I've been going back and looking at the 2023 study to kind
[1:28:16]
of see what were the assumptions we made back in 2023 about debt placements and everything
[1:28:22]
else, just to see how this matches up. Now, back then, we didn't know that the county
[1:28:26]
was going to be so kind as to pay for the, the water tower, or the Union Star Treatment
[1:28:31]
Plant. So we had set the rates, um, assuming that we were going to have to borrow
[1:28:38]
for the water tower. And then borrow for the Easy Star Treatment plant. Now, we'd
[1:28:45]
also ended up You know, having some other capital costs kind of blow up in there.
[1:28:50]
But that was a nice You know, bonus there, even with those two projects paid for,
[1:28:56]
we still were assuming that there would be an additional loan. Um, coming up in 2029,
[1:29:03]
so about a year later than what we're talking about here for another 2.5 million.
[1:29:07]
So we, we kind of knew that, you know, so, um, I do think we're probably running
[1:29:13]
a little hotter than the rate study assumed, um, but that's, I think mostly gonna
[1:29:17]
be in the operating costs and then just the CIP costs that we just saw keep going
[1:29:21]
up. Yeah, and I mean, the P5 project didn't exist then. Yeah, And, and, uh, of course
[1:29:27]
we need to see what our reserve levels are like relative to the policy, but it'll
[1:29:31]
be very interesting, I think when they get their first rate model out, you know,
[1:29:36]
what's, what's the number that makes it close, and that's when we'll really start
[1:29:39]
talking about capital because we'll just start to make, they have to make decisions
[1:29:43]
about, OK, are these nice to haves or are these must-haves? Yeah, I, I can't in any
[1:29:47]
way like say how I feel about finishing the across the lake line until I know like
[1:29:51]
what that's gonna translate into like rates wise and there's only. There's probably
[1:29:57]
only 3. Smaller capital projects that are gonna be new and everything else. It's
[1:30:04]
just continue moving around. Um, and they're critical. They're not, they're not one
[1:30:07]
of these, they're must do. Yeah, but it'd be nice. I mean, we've, we've been spending
[1:30:12]
2 to $3 million a year on capital for the last 3 or 4 years, you know, I, I don't
[1:30:16]
mind a little lull after we finish. I'm, I'm happy to make this little list and go,
[1:30:20]
look at that. I'll have a break in 2030. Well, we can focus on the Southern collector
[1:30:28]
and the North Southern Trail and the and the Northern Greenway. This is why I'm not
[1:30:31]
going anywhere. I constantly have things to do here. Everything is a new day. Yeah,
[1:30:35]
we try to get all our links in with the county before they change their process,
[1:30:39]
or if it's changed. Um, I will say that somebody had him in the county whose name
[1:30:45]
was me was like, once I finish this study with the Western towns, I'm retiring, so.
[1:30:51]
Um, so, uh, we're good with the, we happy with the finance report. Are we on the
[1:30:56]
right track? It's more data. I appreciate that, yeah, um. Man, I was so happy about
[1:31:03]
that. Now I look at the next subject on the. You're moving to a different part of
[1:31:08]
my brain now.
[1:31:12]
All right. So yes, the next topic is the conference of plan update. I saw we had
[1:31:16]
a staff memo on that. Um, did you want to talk through it? Give me a second. Um,
[1:31:22]
can I say, so while you're gathering your thoughts, I really appreciated the sort
[1:31:26]
of all the hedging that you did in that because I understand why you're tailoring
[1:31:32]
this so very carefully, the language in there. So I read through it and thank you.
[1:31:36]
I, I, the scope, the narrowing the scope is what I appreciated. I have worked on
[1:31:40]
it for a while. I apologize. I had it in my hands earlier this year and it just kept
[1:31:44]
and keeps other people from, um, focusing. So strangely, me and Bedford's on the
[1:31:51]
original comprehensive plan in 2017, and here we are today. I can't believe we're
[1:31:54]
at the 10 year mark. Um, So it was the direction of counsel to go back to the, the
[1:32:01]
comprehensive plan and do um You know, go through and cross out projects have been
[1:32:06]
completed, change dates, update data, um, no, no massive change to the document,
[1:32:12]
just a cleanup and a revisit. Uh, we went back through a staff and tried to add in
[1:32:19]
some language that talked about what to do if there's an actual policy change that
[1:32:24]
needs to be changed. A policy that needs to be where you want to change. So we call
[1:32:29]
that an amendment. So think of the con my approach is this Think of it as the conference
[1:32:33]
of plan like the zoning ordinance. You don't just go and delete a line or add a line
[1:32:37]
in the zoning ordinance. You actually have to propose a who, what, when, why. You
[1:32:40]
call it amendment. It's an official change to the, the document. So our recommendation
[1:32:45]
is that we go through the cognitive plan, same concept, do an overall cleanup, refresher,
[1:32:51]
new maps, new data. Things have changed in 10 years. But if there's a policy that
[1:32:55]
really gets to all of you that you really feel is important to do you want to change,
[1:32:58]
talk about it, defend it, explain it. So, um, The key things
[1:33:06]
are time-specific references like within 5 years by 2020, tables, figures, statistics,
[1:33:12]
projects that we planned to do that we completed, studies that we talked about and
[1:33:17]
we finished like we put the Appalachian Trail Community 10 years ago. Um, references
[1:33:23]
to organizations, uh, goals, strategies, factual statements, and longer development.
[1:33:29]
Things that um don't Requiring amendment right now is aspirational goals I've been
[1:33:36]
achieved, uh, policies and growth plan, housing, transportation. That's at this point,
[1:33:39]
that is your policy. If you want to change it, talk about it and explain why, um.
[1:33:44]
Anything uh historical? And statements about community values and identity. We spent
[1:33:49]
a long time doing community outreach. We did surveys, and community meetings. I don't
[1:33:55]
see anything that's changed in the community's output 10 years up to the day. Um,
[1:33:59]
but if there's something that you'd like to talk to the community, we can do a survey.
[1:34:03]
Uh, I, I don't think we should plan a survey unless, unless, uh, you know, there's
[1:34:08]
a strong sentiment for it. Maybe that's something we can talk about during the planning
[1:34:11]
session next, next time is, is, do we want to do a survey? And if we do, I think
[1:34:17]
we should have some focus to goal for that survey, right? And just let's just throw
[1:34:20]
stuff out there. Yeah, I would recommend not to do a survey because I'm proud of
[1:34:23]
all the work we did, but it was a bit more. I just put it out there because I felt
[1:34:26]
bad saying. No, I, I think, I think that's, that should be on the agenda for the
[1:34:31]
just as a question to the council, but in a long form meeting like that to just kick
[1:34:36]
it around and see whether we all agree with you or whether a member of the council
[1:34:39]
strongly disagrees with you, but I don't want to have that debate tonight. Let's
[1:34:42]
have that debate in that long meeting. So you, you were, if I read it correctly,
[1:34:48]
the staff is going to give us all copies of the existing plan in November. I give
[1:34:55]
it to you now. It's on the website, but um. So You're gonna get my bearings. So,
[1:35:03]
We as staff are very busy right now. We're, we, we cannot give 3 years to a comprehensive
[1:35:08]
plan amendment update. We want to be clean, methodical, organized, fair, but
[1:35:16]
I, I love the compliment. I wish I could do it all the time. It's great. It's my
[1:35:18]
favorite thing. Um, but, uh, I'm proud of the work. I was there to write it. I remember
[1:35:25]
all the work that went into it. It feels like it was yesterday. A lot of it's still
[1:35:28]
very relevant. And so I don't think it's like aged badly at all. I think it's aged
[1:35:33]
pretty well. And so, you know, I, I like to think of this as this is a review, not
[1:35:38]
a revision. And that's what I put in my memo was that the best part about this process
[1:35:42]
is to pat yourself on the back and show what you've accomplished at the same time
[1:35:47]
review your goals and your. To do list, you know, what were we thinking about? Why
[1:35:50]
are we thinking about that? There are things out there that I'd love to see come
[1:35:54]
true, but we just haven't had the time and where do we put that on the priority list.
[1:35:58]
Yeah, and I wouldn't mind if like if there's an output from this that says, look,
[1:36:00]
here are the things that met the criteria of a, of a, of a review, you know, of a
[1:36:05]
review right now. These are the things that the must fixes, the things that We know
[1:36:08]
we have to change outdated maps, like you said, things like that, like a change log
[1:36:12]
that you get when you update an app, like here's the things that we updated. And
[1:36:15]
if the planning commission or the staff or a council member has some things that
[1:36:19]
they think, oh, if we were doing a revision of comp plan, I really wish we could
[1:36:25]
go and take a hard look at this one chapter or this area, this policy. I'm not opposed
[1:36:29]
to like the planning commission or the council having just a little, you know, addendum.
[1:36:34]
Of items to make sure we cover in the next comprehensive plan review and just sort
[1:36:39]
of put it off to the side and say, look, these are the things that we didn't do during
[1:36:41]
this update, but we've identified as things that require further study. And just
[1:36:47]
like, I don't want to like forget anything we we look at during this review process.
[1:36:51]
I just don't want to have it be, I don't want to hold the whole thing hostage to
[1:36:55]
getting it perfect all over again. And, and that's in here. I'm sorry it's a long
[1:36:59]
memo. Talks about we don't need to improve the language or make it sound better,
[1:37:04]
you know, if we don't scope creep by chain. Yeah, I said, I don't want to forget
[1:37:10]
anything important that comes up as part of this review process, but I do want to
[1:37:13]
say, well, if we're gonna really like tear into a chapter, let's kind of just queue
[1:37:18]
that up for a future more comprehensive review of it, um, and I promise to stay away
[1:37:24]
from commas.
[1:37:28]
I brought you all another funny story about the comp plan. I had it all the way down
[1:37:31]
to the end. It was, it was perfect. I was 9 months pregnant with Lincoln. He was
[1:37:35]
coming in like 2 weeks. I was like, I'm gonna get this thing out of planning commission
[1:37:40]
to council, the town council, and I, I took it to planning commission ready to go,
[1:37:44]
and they delayed it. And so I had to have Lincoln and Mary Anne carried the comp
[1:37:49]
plan through the summer. Until I returned. To this day, I don't know what was deleted
[1:37:54]
while I was on maternity leave, but I trust Mary I did it completely.
[1:37:59]
I think my thing about squirrels or birdhouses was deleted. But um all right well
[1:38:05]
I have a question. Is it this is the first time in 10 years that we're reviewing
[1:38:09]
it, or was it at a 5 year mark that we looked at it too? So we've looked at it a
[1:38:13]
couple of times. We did the Western BLA amendment and we also did the commercial
[1:38:18]
district here amendment. So at any time you can do an amendment to the document,
[1:38:22]
which is why I'm reminding you that there is a policy for amending your. So think
[1:38:26]
about it in your head like that when you take out a policy, is it on a 5 year review
[1:38:30]
cycle or a 10 year review cycle? Well, we didn't do anything before this. This is
[1:38:33]
we're setting a piece now, so 10. It's, it's, you're, you're legally required to
[1:38:39]
at least look at it every 5 years and talk about updating it and make decisions you
[1:38:43]
want to update it, OK. So for timeline of staff review first, when are you thinking,
[1:38:50]
and I think it might have been November is when we'll get so I actually was just
[1:38:56]
working backwards and to be honest, what I really want is that you have completed
[1:39:00]
and adopted it at least 6 weeks before the election. Because I don't want it to feel
[1:39:05]
like you've just done something and there might be a whole new council next year.
[1:39:09]
I'm not saying, you know what I'm saying like, like I want it to be plenty of times
[1:39:11]
that this council is the one reviewing it because I've been there before where people
[1:39:15]
feel uncomfortable as the election is approaching, then people start to go, oh, maybe
[1:39:20]
we'll just put it off until after the election so that person gets a chance to review
[1:39:24]
it. So I was just trying to get into like September to be done. I think it was a
[1:39:30]
good schedule. Just giving the planning permission 6 months is a good amount of time.
[1:39:35]
I think that's a serious effort. And in there it talks about doing a work session
[1:39:38]
with the council halfway through and along the way you all receive copies so you
[1:39:43]
can come to me if you have a question. It, it, I don't want to feel like you waited
[1:39:46]
till they were done and then looked at it, just feel like it's a living document,
[1:39:50]
so you stay ahead and not feel like you're catching up. We're looking forward to
[1:39:55]
it. Speaking of, should we talk about the town council reps of the planning commission?
[1:40:05]
I'm certainly open to that discussion. Do you want to get off of it? No, I, I, I,
[1:40:12]
I'm just a liaison now. Uh, are you wanting to continue to stay on I'll continue
[1:40:17]
and I, I, you know, I. Actually like this project to, to take a look and I think
[1:40:23]
I'll be able to learn a lot from it and be helpful, OK, and actually look at it from
[1:40:28]
maybe from somebody that hasn't looked at it really much before. So, so, um, so then
[1:40:34]
it sounds like there should be a motion to appoint Trey Worth as the planning, the
[1:40:38]
town council representative of the planning commission. Maureen, is there any specific
[1:40:41]
verbiage we have to do with this? OK. OK, well then, I, I move that, uh, Trey Worth
[1:40:46]
be the, uh, Round Hill Town Council's representative to the Round Hill Planning Commission.
[1:40:51]
Second. All right, it was, uh, uh, moved by Vice Mayor Pacheco and seconded by Councilperson
[1:40:58]
Graham. I'm, I'm not hearing any of the nominations, so I think we can probably just
[1:41:02]
go to discussion. Is there any discussion of this before we vote? Can he vote on
[1:41:07]
the council? I mean, on the planning commission, he'll be, he'll even though he's
[1:41:11]
just a representative. I understand too. That's how it's always been. Yeah. Oh, it's
[1:41:15]
always been. My call was the planning commission, yeah, before, yeah, and it should
[1:41:21]
be a recorded voice clip. Yes, OK, so, but you already, yes, I knew that.
[1:41:28]
OK, well then we'll proceed to a vote, so please. You can abstain if you want. Abstain,
[1:41:36]
uh, Isaac Pacheco. I, Mary and Graham. All right, Beth Caseman, I, Jed. Good all
[1:41:42]
fair. All right. All right, Trey, you're back on the planning commission and the
[1:41:48]
town council. Um, would you like me to bring this back after the retreat, or did
[1:41:56]
you wanna act on it tonight?
[1:41:59]
Does the council have any issues or concerns with what has been presented tonight
[1:42:02]
as far as the process for the for the comp review and the schedule? No, I, I thought
[1:42:07]
it was good. Um, are we talking about it at the retreat though? Well, I think it
[1:42:12]
will just come up and if there, I don't, I don't, I don't see anything. I think I
[1:42:16]
have a good feel that everyone likes the plans presented and not to really veer off
[1:42:19]
of it right now. Yeah, I think unless I think it might come up only if we find there's
[1:42:25]
other priorities for the planning commission that we identified during the retreat,
[1:42:29]
and it's just be a matter of, well, what do we want the planning commission to work
[1:42:32]
on first. But this seems like something that should be a priority anyway for the
[1:42:36]
planning commission. Staff just ask for support from the council. So that means the
[1:42:41]
planning commission don't. To, to, to be, be nice to the nice to the staff and not
[1:42:48]
become like, you know, two meetings a month for you, you know,
[1:42:53]
that's why I like the 6 month period because it, it lets it so that look, you can
[1:42:57]
still do this with once a month meetings. You don't have to worry about doing twice
[1:43:00]
a month if you get the full 6 months. So, but mostly the only thing I've noticed
[1:43:05]
and maybe that we can talk about at the retreat is when we sang in that memo, we
[1:43:08]
talked about like the vision of the town. Isn't changing at all. Maybe we can just
[1:43:13]
review that and just make sure that that's very accurate because I think that will
[1:43:18]
then kick the whole look at the entire thing to make sure that everybody agrees that
[1:43:24]
that's still on track. Yeah, and, and it's not saying the vision can't change during
[1:43:29]
the process, but it's. Yes, it was a bold thing to say. I apologize. The vision can
[1:43:34]
change. I, I can't stop you guys from changing your vision. Well, just, uh, just
[1:43:37]
plan on having this, uh, uh, agenda item for the planning for the strategic planning
[1:43:42]
session. And it doesn't be a long one, but just, uh, an overview pulled from the
[1:43:47]
conference of plan, as well as the current strategic planning document, just sort
[1:43:51]
of a general overview that we can just review that. OK. Sorry, I was going to say
[1:43:58]
no cough. Um All right, so it's only 500 pages straight if you want to read it.
[1:44:06]
It's actually a very compelling read, I will say. Hey, I just had a record. I scrolled
[1:44:13]
through it already, about half of it. OK, yeah, we'll get you printed copies so it's
[1:44:16]
easier. All right, so there is a motion to, uh, refer this to the planning commission
[1:44:21]
that the staff is in the has in the memo in the staff memo. Let's go ahead and go
[1:44:26]
through that. Do they have to vote on the, the resolution or the sorry. To adopt
[1:44:32]
resolution to revert it. Yes, OK. I move that the Round Hill Town Council adopt resolution
[1:44:39]
number 2026-05 authorizing and referring the review and update of the 2017
[1:44:46]
Round Hill Comprehensive Plan. To the planning commission and town staff consistent
[1:44:53]
with the scope, guiding principles, and schedule outlined in the staff report and
[1:44:59]
attachment one with the goal of completing the town council public hearing by September
[1:45:05]
15, 2027. All right, is there a second to that motion? 2nd. All right, discussion
[1:45:13]
of the motion to essentially ask the planning commission and staff to go forth on
[1:45:16]
what we just discussed.
[1:45:20]
All right, this is a voice code. Paul James I Trey Worth I Isaac Pacheco I Mary Anne
[1:45:26]
Grammar Beth Caseman I Jim, Jim Mulber. All right.
[1:45:34]
Thank you. OK, I'm just trying to clear the plate. Part of all the implementation.
[1:45:41]
I want to point that out too just Taking the time to look at those projects in there
[1:45:45]
and kind of put them on a 10 year, a future 10-year plan. OK, next is Updates. So
[1:45:53]
we got the project update um from Harriet, and utilities or any other utility project
[1:46:00]
updates we need.
[1:46:04]
The Hill High Circles moving forward, but no, nothing outside of that. OK, so the
[1:46:10]
office is open for counsel. Does counsel have any questions on the CIP projects update
[1:46:15]
that was sent out? Yeah, no, I mean, I'll see Harry's report was really good. Yeah,
[1:46:21]
we're doing, we're kicking off a new project now is doing an electric assessment
[1:46:25]
of the entire system. We brought in, um, electricians that work for Tyler Wiesberg,
[1:46:31]
a boat. Engineer to kind of go through and review our system to look for any um issues
[1:46:36]
that came out in the optic report from two years ago. I had one question and maybe
[1:46:41]
it wasn't utility. It was on your report. Um, someone turned us down on a bid. It
[1:46:44]
was Dominion Paving or something like that you had said. I don't remember. Your report
[1:46:50]
said you had sent out two bids. Is that related to that or is that something else?
[1:46:57]
OK. All right. This is, um, it's been a project we've been having for the last 2
[1:47:01]
years to review that original panic report and form an actual capital project to
[1:47:05]
implement the recommendations. OK, thanks. And anything else we also find. And then,
[1:47:11]
uh, Southern Greenway, is there any updates? Um, I saw that the engineering is moving
[1:47:16]
forward, so we had a meeting, I guess I had a meeting with the county to discuss
[1:47:20]
the funding request and go over the plans and Uh, talk about the next
[1:47:28]
step of acquiring easements, and we don't see issues. There's so few easements, so
[1:47:35]
it goes along. Any questions from the council on the Southern Greenway or the town,
[1:47:41]
uh, manager's weekly report? No, I just want to compliment all members of the staff.
[1:47:48]
The weekly reports, um, have been very, very thorough and great reads, and I look
[1:47:53]
forward to looking at them every week, so. It makes these meetings go much more efficiently.
[1:47:59]
I have fun trying to figure out who this person is.
[1:48:06]
It makes it hellever bigger, Mary. My big plans, however, we've got like 6 departments.
[1:48:11]
We do. It's actually just one. All right, um, then I'm gonna go ahead and proceed
[1:48:17]
to council comments. Paula, did you have anything? I had just a few things. Um, is
[1:48:21]
it possible to put everyone on the website? Like, I went onto the website a couple
[1:48:25]
of weeks ago and, and not all the employees are on there listed. We can work on that.
[1:48:29]
I just was curious, um. The, um, you guys hosted a quarterly town managers and county
[1:48:36]
administrator meeting. How did it go? Was it good? Was it all of them, like all town
[1:48:40]
5, there's 5 town managers.
[1:48:44]
Yes. There's 5 town managers for the county administrator that comes. Um, I'm now
[1:48:49]
the senior town manager of Loudon County. Are you really? Well, because everybody
[1:48:54]
else is interim, so. Me and Jason from Lovisville, so I, I felt powerful because
[1:49:01]
of what the middle guy, the middle girl's intro first was intro.
[1:49:06]
We he's retired, right? Somebody's retired, although we, you know, me and Keith was
[1:49:11]
my original boss in Lovett school, so it's kind of ironic for him to be the interim,
[1:49:14]
and I'm one, and, uh, and Jason's been with Loisville for 5 years, so you win. I
[1:49:21]
win the prize. I'm gonna stop right now in the peak of my career. You're too young.
[1:49:25]
I'm the only female in the country, but, um, no, it's a good, we always use this
[1:49:29]
opportunity to compare notes and kind of. Get the kindness here to listen to us as
[1:49:33]
a combined unit for projects that we need. Oh, that's fine, um. So, I was just a
[1:49:40]
little confused about, you were, you stated that Bowman was um coordinating with
[1:49:46]
Fugue to as their, to see if they did the work. Why is Bowman in charge of, of Fugue's
[1:49:51]
work with the pad and the um Because of the engineer, it's part of closing out any
[1:49:56]
project that the engineer helped design. They come back and check to see if the work's
[1:49:59]
done because we're not qualified to, to check to compare the plans to some on the
[1:50:04]
ground. So the same thing with all of our capital projects. There's always an engineer
[1:50:08]
who comes out and closes it out before we accept it. Oh, OK, OK. That makes sense.
[1:50:12]
Um, and the other thing was on the reservoir apparently the, the AMT Engineering
[1:50:18]
Company was, they gave us an annual dam inspection report and then now they're going
[1:50:22]
over a dam break study report so they give us two reports, yeah, it's part of um.
[1:50:29]
Will we see any of the reports? I can give them to you, but when you own a dam, you
[1:50:33]
actually have to submit a great study that you've analyzed what would happen if you're
[1:50:38]
great and you file that with the state, OK. It's something we should have done decades
[1:50:43]
ago.
[1:50:45]
But we weren't regularly. We, it wasn't a dance. It was a dance. It wasn't a beat.
[1:50:52]
It wasn't. We fell under the wirecar and we drew attention to ourselves. Oh well,
[1:50:57]
uh, that's why I had thought. Thank you for the clarification. Which is great. OK,
[1:51:01]
I, I just wanna thank Melissa, um, for going over like over 3 hours. I think we were
[1:51:06]
together 3 hours, um, as an overview, which is very helpful. And then Beth and I
[1:51:11]
went on a utilities tour yesterday. Was that yesterday? Um, yeah. Um, which, which
[1:51:18]
was really helpful because, you know, kind of getting me up to speed, but to really
[1:51:24]
take a look at the maps and, and all the well, so I appreciate the time that just
[1:51:28]
to get me up to speed there already, um. I just, just a quick question with state
[1:51:34]
you hired Stacy, right? Um, what, what is her responsibility as far as like communication
[1:51:41]
or, or social media or anything? Is that part of her job description? It's a new
[1:51:45]
part of we've, we've created a new position, well, not position, a new responsibility,
[1:51:50]
which is, um, just paying attention to the, the PR, and I think that's your job.
[1:51:55]
Your job is to pay attention to how Facebook looks, how the website looks, um, you
[1:52:00]
and I talked about doing like 2 posts a week, um, working on a newsletter so that
[1:52:06]
we have a finished product to give to Kim. Um, part of it also is the PR to the customers.
[1:52:12]
So when there is a waterline break, she'll be the person to make sure that we immediately
[1:52:16]
post something on Facebook. When it's done, post on Facebook, um, but it's, it's
[1:52:22]
something that we're working kind of in reverse from the council's direction to do
[1:52:26]
more PR. So we're open to suggestions, but we have a little budget, you know, we
[1:52:31]
could send out postcards. We talked about Logan doing videos about your grease and
[1:52:36]
your system. But um it's something we're working on so it's the first step in that
[1:52:41]
direction actually assigning somebody to that task and um yeah it's exciting and
[1:52:47]
uh as a reminder everybody she's taking over some of the billing administrator's
[1:52:51]
responsibilities so that because Kim got promoted to be more of a number 2 to Steve
[1:52:55]
and take on some of the big projects like maintenance inventory, um. Sleep sleep
[1:53:02]
management things like that. So is she, uh, working 40 hours.
[1:53:12]
She was here 40 hours this week. OK, but, um, is, uh, Donna is not 40 hours for 3
[1:53:19]
years. Oh, OK, yeah. And with Stacey, but Hooper's not. Hooper is only 2 days. Well,
[1:53:27]
2.5. Well, I'm giving you a little once she graduates, so, so Hooper's almost done
[1:53:30]
her degree. She's gonna graduate in December and then we get her for 3 days. I still
[1:53:35]
volunteer, um, but with Stacey, um, to your point, Councilor North. Um, over time,
[1:53:42]
um, she's gonna be looking into other avenues of social media, um, you know, kind
[1:53:46]
of checking with some of the other jurisdictions. I know that of course releases
[1:53:50]
Nextdoor and some of these other outlets, um, so yes, if you have any, um, recommendations,
[1:53:56]
ideas, um, I'll be working with them on a policy. We do wanna have a social media
[1:54:00]
policy, um, that's very important, but if you have any ideas or, or outlets that
[1:54:05]
you're interested in the town pursuing, I have lots, yeah. And also it's, it's internal
[1:54:12]
communication as well. One of the things I told her is to work on is figuring out
[1:54:15]
calendar, how to manage your calendar, so we all know where everybody is and what
[1:54:18]
we're doing and things like that. Thank you. And lastly, is there, is there anywhere
[1:54:25]
that talks about my responsibility as that rep to, uh, at that rep to the planning
[1:54:29]
commission? It means you are a planning commissioner, yeah, and then you report back
[1:54:34]
during council meetings. I did have a little chat with you about that, but I didn't.
[1:54:38]
There's nothing written that I can just kind of wing it. It's an honorary wing it,
[1:54:42]
but you're a member of both bodies, full voting member of both bodies, OK. Isaac
[1:54:46]
will train you.
[1:54:49]
We enjoy it very euphemistically. He's gonna cry. Oh yes, yes. Keep them on fast.
[1:54:56]
I'm curious because I've not heard about it for a long time and I know the ball's
[1:54:58]
in the county's court, but do we have any sense about when they're gonna do what
[1:55:04]
they said they're gonna do with the Main Street? Oh, that's like a long update. I'll
[1:55:08]
find out. Oh, don't put that there. I, I'm not asking for, for follow up. I was just
[1:55:15]
curious if there had been any, any feedback regarding that. It's, but it's out of
[1:55:18]
our hands, right? The county has it. I just, just keep it no further, no further
[1:55:23]
questions. Yeah.
[1:55:28]
Thank you. That was it. I have two things. One, I think. You know, come
[1:55:35]
Arbor Day, we should plant a tree in memorial of Anne Thomas, um, I like that idea
[1:55:43]
and invite, uh, her daughter to come, you know, and maybe she has suggestions of
[1:55:50]
what type of tree. Um, and then secondly, I'm not sure whether, uh, Jim Mulfair can
[1:55:58]
add anything to this or not, but I either drive, well, I drive past the train
[1:56:06]
station regularly, and, uh, the train station is an important landmark to
[1:56:14]
the town, and
[1:56:18]
It's going to need painting, I think. Um, now, I understand that they have
[1:56:25]
severe, uh, Utility issues inside the building, so there's a lot that
[1:56:33]
needs to be done to it, but I would hate to see the train station. Deteriorate. Is
[1:56:41]
it on the historic register? Is it like a historic register building? Is it someone's
[1:56:45]
house? Yes, it's private, but the homeowners are living in Italy right now. Oh,
[1:56:53]
so. I just, you know, I would like to see maybe the town do something to encourage
[1:57:01]
or actually, you know, paint the building just so it doesn't deteriorate.
[1:57:09]
You know, to the point where You know it It falls down or has to be taken down,
[1:57:18]
so it's just I pass that on.
[1:57:23]
Do you have a way to contact the owners yourself? I think Donna Weiss and I could.
[1:57:30]
Reach out as a private citizen. Yeah, I'll, I'll, I'll, I'll see what I can do in
[1:57:36]
the next month.
[1:57:39]
It's the other 10, I, I forgot one thing I wanted to give you all a shout out for
[1:57:44]
the beautiful banners, the fall banners. It looked really nice. That was a nice fruition
[1:57:49]
of that project. It looked really good. Sorry, OK, that's all I have. OK. I like
[1:57:54]
Trey wanted to thank Steve and the rest of the utility staff for an excellent tour.
[1:58:00]
It was actually really helpful to see, so we did a deep dive on the wastewater treatment
[1:58:05]
plant and saw all of the buildings at the wastewater treatment plant. He took us
[1:58:08]
up top to see the tanks, um, and then we did a tour of the town, um, all the town
[1:58:14]
facilities, but You know, we've had a lot of discussion. Steve came to us about inventory
[1:58:20]
and how important it was to have some sort of tracking system. You really see that,
[1:58:24]
and of course we approved it, but you see that firsthand when you go physically into
[1:58:29]
those buildings and you see how much inventory and tracking. There is, um, it's,
[1:58:37]
I think it's really helpful to go and see the work that the utility staff were doing
[1:58:41]
every day and as we were going through town just passing each of the town parks,
[1:58:46]
uh, which wasn't an official part of our tour, but of course you observed that our
[1:58:50]
utility staff are also doing double time to mow and to put out the lovely barrier
[1:58:58]
that Steve built himself around to mask the porta potty in Neil's Polson Park. And
[1:59:04]
you know, Niels Poolsen looks great. Um, is that what it is? Yeah, there's a green
[1:59:10]
structure that looks very non-imposing and blends beautifully, and it's covering
[1:59:15]
up a porta potty in the park, um, and the shade structures are up, and I, it just
[1:59:21]
reminded me how much we as a town have done. In recent years, um, with our little
[1:59:28]
engine that could to make a park system in Round Hill, uh, that didn't, that didn't
[1:59:34]
exist before, um, and so I just wanted to thank you all for taking the time to do
[1:59:39]
the tour, um, the, the trailer, I had never seen the new offices over there, they
[1:59:45]
looked great, um. And I, I just, it was very impressive. So thank you and thank the
[1:59:53]
staff for us. Yeah, we definitely increased our professionalism by like 35% this
[1:59:57]
year between hiring Buber, Steve, and the trailer. Well, some of the new staff were
[2:00:03]
there. Some of the existing award-winning statewide award-winning utility staff were
[2:00:07]
there. So I, it was very, it was very impressive, um, and a big, lots of big steps
[2:00:13]
forward. When did you see that, um, so. That's one place with two of our operators
[2:00:19]
won Best operator of the year this this past year. Yeah, we met her and Ashley was
[2:00:23]
there when we were doing our tour and my newest fire, Owen was there, yep, um, and
[2:00:28]
we haven't had a chance to really pat ourselves on the back about Nels Fulton Park
[2:00:32]
because I was meaning to send you like a nice pretty report, but, um. We were able
[2:00:37]
to get the new water fountain in, the porta potty, the shade structures, um, we got
[2:00:43]
new mulch under the trees, so it was really exciting to get kind of like a, a refresh
[2:00:47]
and that. Park this year so. Mhm. It looks great. Mhm. OK, Jim.
[2:00:58]
Uh, I'll abstain due to technical difficulties. Um, I'll speak for Jim. I spent time
[2:01:04]
with Jim's wife today. Jim's wife invited me to come to, uh, her school to interview
[2:01:10]
the students as if I was hiring them to be operators or anything they want to be,
[2:01:15]
but I tried to get them to be operators. Um, every time a kid said science or math,
[2:01:19]
I said, Here's my card. I'm for a tour. Starting to be young at 13, but yeah, I wanted
[2:01:25]
to thank Jim for letting me go for having Jim invite me. So that was exciting.
[2:01:33]
OK. Um, I don't have much to report because, uh, I already gave you my report in
[2:01:38]
the last whole meeting, last meeting, and so we haven't met again yet. Um, but, uh,
[2:01:43]
and I don't have a whole lot of other things on my plate. So I'll just say it's just
[2:01:47]
been a very productive summer for the staff, even though we took August off, it doesn't
[2:01:51]
seem like the staff did. And, uh, so I just want to say kudos. So, um,
[2:02:00]
someone gonna take us out. Yeah, I have a motion. I move that the Round Hill Town
[2:02:03]
Council recess its open meeting and convene a closed session to discuss and consider
[2:02:08]
the acquisition of real property interests for public utility purposes where discussion
[2:02:12]
in an open meeting would adversely affect the town's bargaining position or negotiation
[2:02:16]
strategy. As authorized by Virginia Code Section 2.2-3711 Alpha 3, the town administrator,
[2:02:24]
town attorney, and risk project manager invited to attend. And is, uh, Rick, or is,
[2:02:29]
uh, sorry, Jim Mulfair gonna be phoned in on this? Yeah, I'll try to dial him in.
[2:02:33]
OK, great. That's the motion. 2nd All right, so moved by uh Vice Mayor Pacheco, seconded
[2:02:41]
by Councilperson Graham, and to have a closed session to discuss real estate matters.
[2:02:46]
Any discussion in motion. All right. Voice code. Paula James I Trey Wars I, Isaac
[2:02:52]
Pacheco. I Miriam Graham.
[2:02:56]
Jen, how do you vote?
[2:02:59]
All right, we're now in closed session. We're gonna take a brief recess.
[2:03:05]
Hi Mike, thanks for Trey Worth. Isaac Pacheco. Hi Maria Graham. Hi Beth Caseman.
[2:03:12]
Hi, uh, Jim, uh, all right, we're back in open session. I move that the Round Hill
[2:03:17]
Town Council certify that while in closed session, only those matters that were identified
[2:03:21]
in the motion to convene the closed session were discussed.
[2:03:25]
Is there a 2nd. All right, this is moved by Vice Mayor Pacheco, seconded by Councilperson
[2:03:31]
James. The vote is to certify that we were good. Paul James, I Trey Worth, I,
[2:03:38]
Isaac Pacheco, I, Mary and Graham on Casement, I. Jim,
[2:03:45]
all right. Hearing nothing more to Trevor meeting adjourned.