[0:04]
Today is August 20th. This is a meeting
of the 350 Midell affordable housing
[0:08]
project subcommittee. Often we have our
subcommittees meet upstairs, but because
[0:12]
we knew we'd have a lot of folks here,
we knew we'd be more comfortable in the
[0:15]
chamber. So, it's a little bit more
formal than we have for some committees,
[0:18]
but uh it definitely serves what we're
going to be doing today. So, I'm calling
[0:22]
the meeting to order. As we uh before we
start any meeting, we like open time for
[0:26]
public expression. This is anything not
on today's agenda. you have the
[0:29]
opportunity to share with the
subcommittee if you'd like to do that.
[0:32]
Now is your opportunity to do so. If
it's not on the agenda,
[0:38]
okay, if it's not about anything that
we're talking about and you're welcome,
[0:41]
but not required to say your name and
what part of Sanfell you're in and you
[0:45]
have two minutes.
[0:50]
» Good evening. I'm Gregory Andrew from
Sarfell Meadows and I want to talk about
[0:54]
the u make a comment about the timing of
the posting of this meeting which is not
[0:59]
on the agenda and that is to just let
you know that
[1:04]
uh to not have posted it on Friday when
meetings are normally posted which we
[1:11]
were looking for and to not get that
posting until Monday is a tactic that
[1:18]
does not build trust with us in the
neighborhood. Several of us commented,
[1:22]
"Why would they wait?" They knew this
meeting was coming. It wasn't because
[1:27]
it's summer and there seemed to have
been a deliberate decision to postpone
[1:34]
the noticeifica notification of this
meeting. Now, you did it certainly
[1:39]
within uh what you're allowed to do
within the Brown Act, but I want to let
[1:43]
you know that that approach is not a
good way to build trust with us who have
[1:49]
been engaged with you and following this
and looking to get more confidence and
[1:56]
more trust from you about your whole
approach to uh this particular project.
[2:03]
So, that's my comment. Thank you. I'm so
glad they were able to make it even with
[2:07]
the less than ideal from your
perspective um noticing. Anyone else
[2:13]
like to comment? Not seeing any other
public comment. Uh we will get right
[2:18]
into it because we have a big agenda
even though it looks like it's only one
[2:22]
item. So we will be discussing initial
summary and discussion of responses for
[2:27]
RFP which is request for proposals for
the development of new affordable
[2:31]
housing at 350 Maryale Road. And I'm
going to turn it over to looks like
[2:36]
Alexis and Greg. Oh, director Hinkle,
the whole team. Okay.
[2:41]
[snorts]
[2:48]
Thank you. Good evening, mayor and
council member. I'm Alexis Caption,
[2:53]
housing manager for the city, and I'm
here with assistant director Greg Miner
[2:56]
and director Micah Hingle to present
responses to the request for proposals
[3:00]
or RFP for the development of affordable
housing at 350 Midale Road.
[3:08]
The purpose of this study session is to
provide a summary of the top responses
[3:11]
to the RFP and to receive feedback on
the application of the selection
[3:16]
criteria to inform staff's
recommendation to the full city council.
[3:22]
We'll start with brief background on the
city's housing landscape. We'll review
[3:26]
the 350 Midel acquisition and grant
requirements, provide an overview of the
[3:31]
RFP, and outline next steps. Following
staff's presentation, we will hand it
[3:35]
off to the development teams to provide
brief presentations on their respective
[3:39]
proposals.
[3:43]
So, a little bit of background on where
we are with housing in Sanfell and
[3:46]
Marin. are in a constrained housing
market in part because as you can see in
[3:51]
this graph while the population of San
Rafll continued to grow over the last
[3:54]
several several decades construction
dwindled.
[3:59]
Limited supply has contributed to a lack
of affordable housing and resulted in
[4:04]
Marin being the second most expensive
metropolitan area in the United States
[4:08]
with the third highest median rent in
California.
[4:11]
Increases in housing costs have far
outpaced wage growth. So that more more
[4:16]
than four in 10 households in Marin
qualify as low income. And the folks who
[4:21]
are low income are the same people that
provide critical services and make our
[4:26]
community run.
For example, based on their average
[4:29]
salaries in 2025, home health aids fall
into the extremely lowincome bracket.
[4:34]
Preschool teachers are very low income
and paramedics are low income.
[4:39]
Not having affordable housing has qu uh
enough affordable housing has
[4:43]
consequences including homelessness,
overcrowding and displacement,
[4:48]
rent burden and severe rent burden,
meaning households are spending more
[4:52]
than 30% or more than 50% of their
income on housing. And they may have to
[4:56]
choose between paying rent and other
necessities such as food and medication.
[5:02]
Not enough affordable housing in Marin
contributes to workforce shortages and
[5:06]
means that workers have to commute from
out of county, contributing to pollution
[5:10]
and environmental impacts.
We are also seeing a distortion of the
[5:15]
county's population pyramid shown here
with a deficit of working age adults and
[5:20]
young families.
And finally, we continue to see racial
[5:24]
disparities across multiple indicators
with black and Latino households
[5:28]
experiencing higher levels of rent
burden and lower rates of home
[5:32]
ownership. For example,
understanding these impacts and that
[5:36]
affordable housing is important for the
economic and cultural vitality of San
[5:40]
Rafale, the city council adopted the
following housing and homelessness
[5:44]
priorities in their three-year strategic
plan, including to facilitate new
[5:49]
housing development, assist in ensuring
housing stability, support a housing
[5:54]
first model, and implement strategies
that reduce homelessness. The project
[5:59]
that we're about to discuss is grounded
in these established priorities. I'll
[6:03]
now hand it off to Greg to talk about
350 Midale.
[6:08]
» All right. Good evening. Um, so in
further in in furtherance of the the
[6:13]
goals adopted by city council with
respect to housing back in November, as
[6:17]
the the subcommittee members are are
well aware, the city acquired 350 Midale
[6:22]
Road, a 2.5 acre property um shown here
on the slide from a satellite view
[6:28]
perspective. Um, thanks to funding from
the county of Marin. Uh, the site itself
[6:33]
was last used as an adult school. You
can see three white structures in a
[6:37]
surface parking lot. Uh it's bordered on
the east by the 101 freeway. Uh to the
[6:43]
north or above this picture, you have
the smart station nearby and then you
[6:47]
have residential uses to the to the west
and a combination of residential
[6:52]
commercial to the south.
Uh the funding that the county provided
[6:58]
came as part of a grant agreement uh
entered into between the city and
[7:02]
county. And with respect to Oh, I'm
sorry. I glossed over the fact that this
[7:07]
is a a two-phase project as part of the
the uh collaboration with the county.
[7:12]
The first phase being an interim shelter
for unhoused individuals and the second
[7:16]
phase being what we're discussing uh
tonight, the permanent affordable
[7:20]
housing development of at least 80
units. Um so in terms of the grant
[7:24]
agreements requirements for this phase
of the project, uh the grant agreement
[7:28]
requires that the city must entitle the
site for at least 80 housing units by
[7:33]
the end of June 2028. It also requires
that the incomes of the tenants may not
[7:39]
exceed 80% of the area median median
income. And just for a little
[7:43]
perspective, we provided what that 80%
of AMI means for a fourperson household
[7:49]
here on the slide.
And in terms of consequences, should the
[7:53]
city fail to entitle 80 units, the city
would be liable for $100,000 for every
[7:58]
unit not entitled beyond u short of the
80 units.
[8:05]
So, as a first step towards realizing
this vision, staff released a request
[8:09]
for proposals this spring to identify a
developing an affordable housing
[8:14]
developer that could help realize this
vision.
[8:18]
The RFP asked uh respondents to provide
a number of
[8:24]
um components as part of their proposal,
including an overview of their proposal,
[8:29]
such as their their vision, the site
design, the affordability levels,
[8:33]
services plan, and their development
timeline. Additionally, information was
[8:38]
requested about their teams and
qualifications, the experience of their
[8:41]
organization, and those working on the
project, followed by information on
[8:46]
their project financials, such as a
pro-forma, information on their
[8:50]
pre-development financing strategy,
operating budget, proposed purchase or
[8:55]
ground lease. And finally, information
was requested regarding the financial
[9:00]
capacity of each developing team s and
which required financial statements from
[9:04]
their most recent calendar or fiscal
year as well as letters from the
[9:09]
developers lenders attesting to their
capacity to undertake this project. Um
[9:14]
once the responses were received, a
panel of city and county staff as well
[9:19]
as a representative of the chamber of
commerce independently reviewed and
[9:23]
scored the proposals received based on
the criteria that you see outlined on
[9:28]
the screen.
Um in terms of the responses received,
[9:33]
there was uh there was a total of five
responses altogether. The scoring across
[9:39]
all panel members identified three
strong uh candidates in EA, Eden and
[9:45]
Saha.
Across the while there were some uh
[9:49]
unique components to each proposal there
was a lot of similarities as well which
[9:54]
was actually a good thing in the sense
that all three provided commitments to
[9:58]
covering pre-development costs. All
three identified funding strategies that
[10:04]
utilize state grants and federal tax
credits. They all provided for community
[10:08]
engagement as part of their proposal.
They all provided a timeline that met
[10:13]
the city and county's grant agreements
of entitling at least 80 units by the
[10:17]
end of June 2028. They all identified
services for future residents. They all
[10:24]
contain a mixture of unit types,
including threebedroom units for
[10:28]
families, and they all propose leasing
the property for 99 years for $1
[10:33]
annually. Um, all al all all that said,
there were a couple differences as I
[10:39]
alluded to a moment ago, including the
number of units being proposed, the
[10:43]
amount of parking provided, and
neighborhood improvements.
[10:47]
And those uh differences and some of
those similarities are outlined here in
[10:51]
this uh summary table. So for example,
EAH um of the three uh candidates is
[10:58]
proposing the lowest number of units and
so understandably also the the shortest
[11:03]
structure, a three-story structure. Um
they are providing they also are
[11:08]
offering to provide the lowest average
affordability level of 45% and the
[11:14]
lowest per unit cost. Um, in contrast,
Eden is proposing the uh greatest number
[11:20]
of housing units as well as the highest
structure. Um, they're also proposing
[11:25]
the largest amount of parking spaces per
unit. And then they're and the most
[11:30]
costly per unit um proposal. In terms of
affordability level, Eden and Saha are
[11:36]
proposing the same average affordability
level. Um lastly, Saha is proposing uh a
[11:43]
level of units and stories that falls in
between the EAH and Eden proposals um
[11:48]
while providing the the lowest number of
parking spaces per unit.
[11:54]
Um so in the end Eden did score the
highest um by the the average of panel
[12:00]
scores but they were followed closely by
EAH and SAHA and ultimately all three
[12:06]
are qualified to sati satisfy the city
county's grant requirements and we feel
[12:10]
lucky to have such strong respondents to
our RFP. Um, at the same time, Eden's
[12:16]
proposal offers the most housing, the
most parking, and it included
[12:21]
neighborhood improvements such as
facilitating a permanent pedestrian
[12:25]
bicycle path or or
an official pedestrian and bicycle path
[12:30]
between uh the 350 Midale site and the
Midale community in the Smart Station.
[12:36]
Um, and when we considered
both the need for more housing, as
[12:41]
Alexis described, the rare opportunity
that we have before us with this uh
[12:48]
sizable site, and the fact that the
city's going to invest time and
[12:52]
resources, whether or not we entitle 80
units or more than 80 units, these are
[12:57]
some of the compelling factors that led
the panel to um score Eden the highest.
[13:03]
Um I will wrap up with just highlighting
some next steps. This is this slide just
[13:08]
kind of provides like a a general um
overview of where
[13:13]
the journey that we're going to be um
commencing in terms of uh the steps
[13:19]
needed to actually finalizing uh the
housing and and leasing the site. The
[13:26]
top half of this timeline identifies
milestones related to the permanent
[13:31]
affordable housing project and below are
milestones related to the interim
[13:35]
shelter. We're still in the very first
milestone, the top left and today marks
[13:41]
really just the beginning of that
process of selecting a developer. Um
[13:46]
hopefully uh after today's discussion
staff will be in a position to present a
[13:51]
recommendation to the full council to
enter into an exclusive negotiating
[13:55]
agreement and we'll be able to come to
terms with the developer and uh move
[14:00]
along this this process. And then for
those interested in staying um a breast
[14:07]
of this project and all the developments
that uh including the next council
[14:12]
meeting, this is the project web page
here. And there's also the QR code that
[14:17]
you can uh use to locate this web page.
You can sign up for email updates um and
[14:23]
news posts related to this. So if you're
interested in staying up to date um this
[14:29]
is the the place to go. So with that, if
there's any more questions, if there are
[14:34]
any questions for staff, we're happy to
answer that. Um if not, as Alexis
[14:38]
mentioned, the the three developer teams
are ready to present and um we can hand
[14:43]
it off to the presenters.
>> And before [clears throat] we end on
[14:46]
that and trans transfer over the
development teams, one point of
[14:49]
clarification want to really make
tonight is this is really not selecting
[14:52]
a project. Um, in essence, if you talk
to these development teams, they can do
[14:57]
all three of these projects in
independently, but really that's their
[15:01]
vision approach that when based on the
input of our RFP, that's what they
[15:05]
basically called out themselves. But
really tonight is just to select the
[15:08]
developer that'll actually be the city's
partner in this. And then the project
[15:12]
will actually be better defined through
the process of due diligence and uh
[15:16]
community input along with um the um uh
exclusive negotiated rights agreement.
[15:23]
There's a lot of other factors need to
come play. That's why we're really on
[15:26]
the early first phases of this, but this
is just an indication of really what the
[15:29]
developers um team saw within this site
for themselves. So just want to make
[15:34]
that point of clarification.
>> Thank you. Any questions?
[15:39]
» Yeah, go ahead.
Just a couple quick questions. Um,
[15:45]
it doesn't say in here anywhere, but I
understand that all of these units will
[15:49]
be rental units and none of these are
anticipated to be sold. Is that correct?
[15:53]
» Yes, that is correct.
>> Okay. Building on that then um when you
[15:57]
did your financial analysis the
proformas was it focused just on the
[16:02]
capital outlay necessary to get the
building built or was there also a sort
[16:06]
of operating proforma for the decades to
come.
[16:14]
» I mean my recollection has included both
the construction and ongoing operations
[16:19]
as well as part as part of their
proposals.
[16:22]
» Very good. Thank you.
>> Thank you. I don't have any additional
[16:25]
questions so we'll go right to it. So
the next part is a presentation by
[16:30]
affordable housing developers
and it looks like you have slides for
[16:35]
them and I understand it. So
>> can I just a point of process so each
[16:39]
fellow hi will have how much time have
you allocated each
[16:45]
applicant
just so we can I can
[16:48]
» I believe they're prepared to provide a
5 to 10 minute overview and then be
[16:51]
available for questions.
>> Okay. And then um EAH was listed first
[16:56]
in our staff report just based on
alphabetical order. And so but we defer
[17:02]
to the subcommittee if you there's a
specific order that you want to proceed.
[17:05]
» No no this is great and so we'll hear
the presentations five to 10 minutes for
[17:08]
each. We'll have questions and then
we'll have public comment both questions
[17:11]
and comments and then there might be
developers come back up and answer
[17:15]
questions. So
>> that sounds great. Um, should I um let
[17:19]
you know when to for the slide or should
I do it from
[17:22]
» I think we're sorting through some we're
trying to make it full screen.
[17:24]
» Oh, sure. Sure.
>> Um, well, while you're doing that, I
[17:29]
guess I'll I'll just start quickly. Um,
so good evening. Uh, my name is Nor
[17:33]
Cauer and I had the opportunity to lead
the EAH housing uh Maryale proposal. Um,
[17:39]
EAH was really excited for the
opportunity to build in our hometown
[17:42]
again. Uh we own and operate 20
properties within 20 minutes of 350
[17:47]
Maryale. So um even just the dozens of
community partnerships we've had over
[17:51]
the last you know 55 plus years are
really great for us to tap into should
[17:56]
we be able to move forward with with the
city on this. Um with me in the audience
[18:00]
I have our EAh development director
Daniel Ry um and our architects Sema
[18:05]
Muscar and Justin Wong from Studio
Tsquare right here if um you had any
[18:09]
questions for them.
>> Yes. Oh, thank you. Perfect. Um, okay.
[18:14]
So, uh, because the city, um, did a
great job kind of frontloading and gave
[18:18]
you a lot in the staff report about
ourselves and our background, I'm just
[18:21]
going to jump right into, um, I had five
critical points basically that
[18:25]
differentiate EAH and kind of reaffirm
our ability to to execute what we've
[18:30]
proposed.
Um, so first, uh, the EH design
[18:35]
acknowledges the Loscalinus Valley
Sanitary District easement that's
[18:39]
running through the center of the site.
Um so because of that we did create a
[18:43]
family oriented community with this
constraint in mind um that fits the
[18:47]
scale of the surrounding neighborhood at
three stories ensures the city dollar
[18:51]
goes as far as it can and leverage uh
reflects the city's values on
[18:55]
sustainability, speed, open space and
innovation. Um we didn't want to start
[19:00]
with a less timely potential option of
the sanitary district relinquishing that
[19:04]
easement without doing you know some
additional due diligence with you all as
[19:08]
a city partner and figuring out what
they might want to do with that. So we
[19:11]
really just started with that as a
constraint in mind knowing that there's
[19:14]
some flexibility should that change. Um
so the EH design centers on an
[19:19]
environmental approach. Uh we'd be
offering a modular full electric
[19:24]
execution. Um plus the potential for
adaptive reuse of some of the existing
[19:28]
structures should the city desire it. Um
we have completed two modular
[19:32]
developments in other parts of the Bay
Area and are starting our third. So we
[19:35]
do have some experience with that. Um,
and this translates to no concrete, um,
[19:40]
less noise, less waste, and less time
during construction. Um, so that leads
[19:44]
me to my next point here.
Um, so our proposal does have the lowest
[19:50]
cost of the three. Uh, tonight we
rightsize the project to fit the
[19:54]
criteria for four viable funding paths
um to increase our chances of getting
[19:58]
funded as quickly as possible or within
the timeline that uh, Greg shared. Um so
[20:04]
and plus to [clears throat] increase our
along with that to also have a possible
[20:08]
better interest rate and access to some
upfront modular capital. So we would not
[20:12]
be able to to offer that high level of
certainty of getting awarded these
[20:16]
particular types of funds um at the cost
efficiency with a more expensive design.
[20:20]
So that is really why we went with the
three-story garden style with the
[20:24]
potential for modular. Um in our
proposal, EH had included a letter of
[20:28]
support from the San Francisco
Accelerator Fund, the housing
[20:31]
accelerator fund. Um that fund requires
family units stay under a $750,000 total
[20:36]
development cost per unit. Um and it
allows us to access a much better
[20:40]
interest rate um than the market. And
they also do have um a great modular
[20:44]
program that we can access. Um so in
addition to designing most cost
[20:48]
effectively to have four viable
financing paths, um EAH did want to
[20:55]
design with the neighborhood character
top of mind. Um, our goal was to reflect
[20:59]
the values and priorities of the city
with deeper affordability, larger family
[21:03]
units, um, had a density and parking
ratio that was practical for families.
[21:07]
Um, the option to include permanent
supportive housing with a potential
[21:11]
health care partner should, um, one
funding become available and should that
[21:14]
be desired by the city. Um, and then
also, you know, just a high level of
[21:19]
sustainability and a lot of open space.
Um and again three stories also gets us
[21:23]
that cost savings but we left our design
very flexible to add on uh or adjust as
[21:28]
we refine with the city as Mr. Hinkle
mentioned. Um so my last point then is
[21:34]
uh
uh collaboration with the city. Um so
[21:39]
connection to the smart train and buses
are critical for our residents. Eh plans
[21:43]
to serve households at an average of 45%
of the area median income which is just
[21:48]
under 100,000 a year for a family of
four. Um so because of that we really
[21:52]
need to um prioritize state funding that
can provide transit oriented development
[21:57]
um that can provide uh subsidies and
operating support and really prioritize
[22:02]
state funds for lower-income households.
Um eh has a very strong working
[22:07]
knowledge regarding improvements to the
pedestrian path to the smart uh train
[22:11]
and to the bus station um and to
downtown because of our prior
[22:14]
partnership with the city um and with
the transit agencies. Uh we were the
[22:18]
partner for the affordable housing and
sustainable communities program grant on
[22:21]
a Northgate mall project that did not
move forward. Um but we do have all of
[22:26]
the the working knowledge and research
and plans that we were going to be
[22:30]
submitting for that application which
would be relevant for this site as well.
[22:33]
Um because it's the same station. Um and
then with that, you know, so we'd be
[22:39]
bringing all that with us. Um and also
would want to work with the city to to
[22:43]
ensure we understand how you'd like to
build that path. um you know in the
[22:47]
right infrastructure improvement funds
that would be available um should state
[22:51]
funding be allowed to to do that. Um so
with that I'm going to end there um and
[22:56]
then I don't know if you want us to do
questions now or after.
[23:01]
» Yeah if we have any top of the line
questions or we just keep going through.
[23:05]
» We'll just keep going through.
>> Yeah. Thank you so much.
[23:16]
Thank you.
[23:26]
» Okay. Can you make that? Oh, cool.
Thanks. So, good evening. Um, I'm Tammy
[23:31]
Strauss from Eden Housing. We have a few
more slides than our uh the previous
[23:37]
presenter, so I might talk a little
faster. Tonight, we're sharing Eden's
[23:41]
vision for 350 Male Road. Our proposal
is rooted in affordability, family
[23:47]
housing, transit access, community
engagement, and partnership, and long
[23:52]
long-term stewardship.
[23:56]
Eden has been addressing California's
affordable housing housing crisis for
[24:01]
since 1968. Our strength is that we're
not only a developer, we're also a
[24:05]
long-term owner, operator, property
manager, and resident service provider.
[24:10]
That means we remain accountable to the
community well beyond construction.
[24:17]
Uh we have a strong and growing presence
in in Marin County and in San Raphael.
[24:22]
Our recent work uh in San Raphael is our
Vivivalon and Kasa Canal which uh was
[24:29]
designed by Van Meter Williams Pollock
who's here with us again tonight. Oakill
[24:34]
in Marin City and Tamalco Homes and
Point Rays. Um our local experience
[24:39]
helps us understand the context
partnerships and expectations in Marin
[24:44]
County and in San Raphael.
Okay. Uh, this project at a glance will
[24:50]
include 111 homes exceeding the city's
80 unit requirement. The homes will
[24:55]
serve households up to 60% of AMI with
an average affordability of 49%. The
[25:01]
proposal will meet the June 30th 28
entitlement deadline and the uh RTDC uh
[25:09]
was mentioned RTDC was pretty high, but
it reflects robust community engagement,
[25:13]
parking, and the proposed public and
neighborhood improvements.
[25:20]
We've assembled a team with the
experience needed to deliver a complex a
[25:24]
complex affordable housing project. Eden
brings affordable housing devel
[25:28]
development, financing, ownership and
operations and resident services
[25:32]
experience. Van meter Williams Pollock
brings strong affordable housing and
[25:37]
mid-rise design exper expertise. and our
engagement team engaged fora brings
[25:43]
community engagement capacity grounded
in equity, listening and local t
[25:47]
context. Together our team is built for
execution and partnership.
[25:54]
I will hand it over to Sarah.
Thank you Tammy. Thank you all for
[26:00]
having us. My name is Sarah Vicaro. I'm
principal with Engage for representing
[26:03]
our team here tonight at engage.
Oh, thank you.
[26:09]
Um at engage fora we believe that design
is better with diverse voices at the
[26:14]
table. Engage for specializes in leading
thoughtful and authentic community
[26:19]
engagement that is not just
informational but truly allows the
[26:22]
community and future residents residents
to meaningfully inform the project. Our
[26:27]
approach will be to listen early while
also being transparent about the project
[26:32]
goals and non-negotiables.
Identify community priorities and
[26:36]
concerns and partner with the Eden and
Ban meter Williams Pollock team to allow
[26:40]
the community's input to inform the
project design and development.
[26:47]
Our engagement approach is rooted in
deep listening and authentic
[26:50]
co-creation. Phases two and three in the
middle of this diagram are where we will
[26:55]
spend most of our time engaging with the
project neighbors, the broader San
[27:00]
Raphael community, and potential future
residents to shape the project. Phase
[27:05]
one at the beginning is where we will
gain valuable insights into the
[27:08]
community through one-on-one interviews.
And then phase four at the end,
[27:12]
accountability. This is where we will
report back to the community on how
[27:16]
their specific input has been integrated
into the design and celebrate that the
[27:21]
project is stronger because of it. Our
engagement process will be closely
[27:25]
coordinated with the project team and
the city um to ensure the timeline um to
[27:31]
to to meet the entitlements timeline and
to ensure that feedback can be
[27:35]
meaningfully informed at specific design
decision steps.
[27:43]
Our team has developed a highly varied
toolkit of events and exercises to
[27:46]
quickly gain an understanding of the
community's values to build trust with
[27:51]
them and to explore design options to
create a project vision together that
[27:54]
strengthens the design. We anticipate
using multiple ways to reach people, not
[27:59]
just the traditional public meetings,
but also neighbor outreach focus groups,
[28:03]
popups at local city events, community
workshops, all with inclusive and
[28:08]
multilingual materials as needed. The
intent is to meet people where they are
[28:13]
and make the participation easily
accessible.
[28:20]
» Thanks, Rick Williams with Ban Meter
Williams Pollock. Uh I've been a
[28:26]
resident of San Rafale since uh pretty
much since I was two or three years old
[28:31]
and uh have lived here in the downtown
for the last 25 years. and we've done a
[28:36]
number of developments which we feel uh
respond to the community input that
[28:42]
we've received on those variety of
projects uh in downtown and also in the
[28:47]
canal area and throughout Marine County.
We've also developed a number of
[28:53]
streetscape projects that expand the
impact of a development beyond just the
[29:00]
housing into pedestrian safety, bicycle
access to transit to neighborhood
[29:07]
activities. And so that is another key
feature of our proposal.
[29:12]
And we've done that on a number of
projects with Eden Housing as well. Our
[29:17]
vision is really a family focused
community uh affordable near transit
[29:23]
taking advantage of the local services
but really it's about giving
[29:27]
opportunities for the residents and this
will forward San Rafll's goals and give
[29:33]
more families the opportunity to succeed
in San Rafll.
[29:40]
The overall area site plan is a one of
simple circulation. We respect and
[29:45]
provide good access for the uh for the
drainage way and all of that area
[29:55]
as well as bike access and pedestrian
access. Uh we looked at multiple
[30:00]
projects, multiple different scenarios.
There's many different uh opportunities
[30:05]
here and we'll listen to the community
to refine and and develop the design in
[30:11]
its entirety.
We've also used illustrations to give
[30:17]
the community really a very clear
understanding of what the development
[30:22]
is. Here's a image on Maryale showing
how the building relates to the street
[30:27]
and relates to the adjacent neighborhood
as well. We even went to
[30:34]
uh into the neighborhood to Las Flores
Avenue and took a picture of how the
[30:40]
buildings just kind of peak over the top
of the homes that are uh directly across
[30:45]
the street the canal from it.
We also because I live in Marin are
[30:50]
sensitive to the uh sensitivity to the
viewing of uh the developments from the
[30:57]
freeway. And so we gave an initial image
from how that would look as well.
[31:03]
And then one of the key issues was that
we really developed a strategy of a
[31:10]
bicycle and pedestrian improvement
access working very closely with the
[31:14]
neighborhood and adjacent uh residents
and adjacent businesses to gain access
[31:20]
all the way to San Pedro Road.
And it's also built with a vision of
[31:26]
sustainability, resilience, and
wellness. So that so the solar system
[31:30]
will support a resilience hub. The bio
swala will will provide the clean storm
[31:36]
water management and bike storage and
repair stations will also provide
[31:41]
improvements and provide access both to
transit and for the residents throughout
[31:47]
the area.
[31:52]
rather than repeat myself. Uh long-term
deed restrictions will preserve the
[31:56]
affordability for at least 99 years. The
design is going to prioritize
[32:01]
accessibility and inclusive design
including accessible common areas,
[32:06]
units, amenities, and circulation.
[32:11]
Uh we're also have our own in-house
resident services provider. Eden's res
[32:16]
resident services model model is
designed to support stability and
[32:20]
community connection. Services may
include on-site coordination, community
[32:24]
building activities, referrals,
workshops, family programming, and
[32:29]
coordination with property management.
The goal is not to provide just housing,
[32:33]
but to support residents need to thrive.
Uh here we go. Financing our favorite.
[32:40]
We have deep experience assembling
layered affordable housing financing.
[32:44]
That's kind of Lasagna right there. This
111 unit concept was designed to support
[32:49]
competitive funding applications while
meeting the city's entitlement uh
[32:54]
timeline. Our early feasibility work
will confirm a SQA path, an entitlement
[32:58]
path, design review, agency
coordination, construction type, site
[33:03]
conditions, and partnership structure.
The schedule again is in structured to
[33:10]
meet the city's requirement to be
entitled by June 30th, 2028.
[33:15]
Um, entitlements, financing, design, and
construction sequencing will need to be
[33:19]
carefully coordinated.
Um, and lastly, thank you. Thank you for
[33:25]
the opportunity to be here and to
present our vision. And we're ready to
[33:29]
deliver a feasible community responsive
affordable housing development at 350
[33:33]
Mary Road.
>> Thank you. And I know we're holding
[33:36]
questions, but Tammy, I have to ask.
Yes.
[33:38]
» So, I really appreciate the outreach and
you spent quite a bit of time talking
[33:42]
about that. Sarah did. And yet, or also
you showed an image of what a building
[33:47]
would look like. So, I'm trying to
figure out how those two mesh when
[33:51]
you're taking in input. And yet, there's
and I know that design changes, but
[33:55]
maybe you could speak to that because
I'm sure other people in the room are
[33:57]
» um I can give you an example. How about
that?
[34:00]
» That would be great. in another
community, we presented a fivestory
[34:04]
building um as our initial concept and
through community engagement and all of
[34:11]
the workshops and things that we did, we
found out that the community really
[34:16]
preferred a four-story building. So,
what we did um through that feedback, we
[34:21]
redesigned the building, made it wider,
not taller, actually um designed for
[34:28]
more units, but a shorter building. So
that's it's just an initial concept and
[34:33]
we refine that through all of the
community engagement that we do.
[34:38]
» Thank you. That help that's very
helpful. Thank you so much.
[34:40]
» And anything else?
>> Uh there might be others but I I just
[34:43]
had to reconcile that. So thank you.
That was Yeah.
[34:46]
» Thank you. [snorts]
[35:01]
Okay. Good evening, mayor, council
member, staff, community members. Thank
[35:05]
you for the opportunity to be here. I'm
Eve Stewart. I'm the senior vice
[35:09]
president uh for real estate development
with Saha. Um and also with our team
[35:15]
here tonight,
we have April Ty. And April and I will
[35:20]
be sharing the presentation. And then
our other team members naan my senior
[35:24]
project manager Katie Akerly with our
architect Chris Hess and Jonathan Stern
[35:29]
are also here uh for questions later on.
So quickly about SA uh we were founded
[35:35]
over 60 years ago. We've developed
approximately 80 properties across seven
[35:40]
counties and in addition to our
development activity we also provide
[35:44]
property management services and robust
on-site resident services. We run a
[35:49]
volunteer program that brings in over
250 community volunteers annually to
[35:54]
support our residents and strengthen our
connections in the broader community.
[35:58]
Because we're a long-term operator,
we're always looking back to learn from
[36:02]
what we've done, where we've been
successful, where we can improve. And
[36:05]
we're always looking forward to make
sure that the new communities we develop
[36:08]
are ready for future challenges and that
they will be beautiful, thriving
[36:13]
communities for decades to come. To do
this, we collaborate with local experts.
[36:17]
We invest in community engagement and we
work with our design team to iterate to
[36:22]
make sure that we are meeting community
needs and can achieve broad-based
[36:26]
support.
[36:30]
We uh do have a strong presence in the
North Bay. Uh we are not in Marin
[36:35]
currently. Um but we have several
projects in Napa and Soma. Um and we
[36:40]
have local Sanfell expertise on our
team. Um, and we've started to connect
[36:45]
with key stakeholders and have received
support and endorsements from the Ritter
[36:50]
Center and Canal Alliance. Um, I'm going
to pass it over to April to talk a
[36:55]
little bit more about community
engagement.
[37:00]
Thank you, Eve, and good evening, Mayor
Kate and Council Member Bushy, um, and
[37:06]
city staff. I'm April Tally, and I'll be
supporting SAHA's community engagement
[37:11]
efforts for this project. I've worked on
community engagement for large complex
[37:16]
developments including Northgate Mall
here in San Rafale and the Patrol
[37:20]
redevelopment in San Francisco. As the
city's project director for Northgate, I
[37:26]
served as the primary point of contact
for community related questions and
[37:30]
communications, working alongside the
developer to keep residents informed and
[37:35]
ensure the city's engagement
requirements were met. The experience
[37:39]
that experience reinforced for me that
engagement is most effective when it
[37:44]
starts early while there is still real
opportunity to shape the project. That's
[37:49]
why our team plans to begin as soon as
the ENA is executed. We'll work closely
[37:55]
with the city and the uh the community
partners, nearby residents and
[38:00]
businesses to communicate early, listen
to concerns, and offer different ways to
[38:05]
participate. The proposed unit count and
parking ratio are a starting point and
[38:11]
we're open to refining both based on the
input from the city and the community.
[38:16]
Thank you.
[38:23]
That's just a quick summary of the
points April made. Um so getting into
[38:29]
this opportunity um our team of course
uh looked very closely at the site and
[38:34]
there were several uh core values core
principles that were informing our
[38:39]
approach. So of course we want to
achieve or exceed the city housing goals
[38:42]
for the site in terms of number of units
build an appropriate scale for the
[38:46]
neighborhood. incorporate universal
design principles so that we have an
[38:50]
inclusive community for folks with a
range of um abilities and challenges
[38:55]
from mobility to uh sensory and neurode
divergent challenges. Um we are working
[39:01]
to enhance the urban design and street
presence along Midale, improve smart
[39:06]
station connectivity and secure state
funds for transit improvements. I'll
[39:10]
talk a little bit more about that in a
minute. Um, and of course we want to
[39:14]
ensure the long-term climate resilience
of our building and this community. Uh,
[39:19]
and also establish a financable pathway
to getting this project done.
[39:25]
And importantly, as we looked at the
site, so this is a massing study. It's
[39:30]
not a design. It just gives a sense of
what could fit on the site and the
[39:36]
scale. Um so here you can see that we
are
[39:41]
initially thinking about a fourstory
design that would have um
[39:47]
bridge the scale of the neighborhood.
There's you know different densities
[39:50]
there. So while this does add density to
the neighborhood, it is um still kind of
[39:56]
a gentle like ramping um and not um we
feel too out of scale with what's
[40:02]
already built there. Um we have
primarily two and threebedroom
[40:07]
apartments in the scheme so that we can
serve families um households with young
[40:12]
children or extended um families that
might have elders also living with them.
[40:18]
The um parking approach is to do surface
parking and that offers advantages
[40:24]
including cost effectiveness
um and providing a buffer for the
[40:30]
neighbors to the south as well as the
freeway. um the 101 there to the east.
[40:36]
Our bedroom count is 185 bedrooms in
this scheme. Um and that's sometimes a
[40:40]
helpful metric to consider. Um the
building itself of course will have a
[40:44]
lobby, spacious community and
multi-purpose spaces as well as smaller
[40:49]
activity and meeting spaces. All upper
floors will be served by an elevator.
[40:53]
And we will have on-site property
management, an on-site
[40:57]
resident representative, so a staff
person who lives on site uh with
[41:02]
maintenance and resident services
offices. And again, inclusive and
[41:05]
universal design features will be
incorporated throughout.
[41:10]
Um we've also taken an approach of
orienting views toward the creek um and
[41:15]
preserving existing trees to emphasize
connections with the existing ecosystem.
[41:21]
bringing in these bofilic features that
enhance wellness um and also provide an
[41:26]
important buffer for flood control and
storm water management.
[41:30]
We envision an active street frontage.
Um and very importantly, we're focused
[41:34]
on active transportation connections and
improvements to get this neighborhood
[41:39]
even more conveniently linked to the
smart station. It is so very close. Uh
[41:44]
but there currently isn't um a formal
way to expediently access the station
[41:49]
without, you know, going out and around.
Um,
[41:53]
next slide is the same site plan, but
uh, we wanted to emphasize the
[41:58]
sustainability features and the thinking
that that we're bringing to this
[42:02]
project. And again, this is just the
early initial thoughts and we're really
[42:07]
looking forward to engaging with the
community and stakeholders to get their
[42:09]
input. But we envision an all-electric
building that was energy efficient with
[42:14]
solar PV array to offset as much of our
energy use as possible with on-site
[42:18]
generation. Uh we have opportunities to
use panelized construction andor mass
[42:22]
frame building technologies to reduce
construction waste and also speed up
[42:26]
construction schedule. Uh superior
indoor air quality will be a goal uh
[42:31]
especially to address the potential
impacts of being close to the 101 and to
[42:35]
protect against future smoke events.
We've increased increased tree cover for
[42:40]
passive cooling, promoting biodiversity,
um preserving site permeability, and
[42:46]
contributing to again improved mental
health and well-being as studies have
[42:49]
shown when you have access to nature. Um
and then back to this connection with um
[42:55]
the the active transportation network to
facilitate biking, walking, scootering,
[43:00]
ways to get around uh that don't involve
driving alone in your car essentially.
[43:05]
Um and of course the Disaster resilience
and preparedness is something that's top
[43:09]
of mind for our operations um where we
operate housing and we have a lot of
[43:14]
elders, seniors, people with special
needs um and we want to be there to
[43:18]
support them um when the worst happens.
Um so some of the features that we will
[43:24]
work to include um is a micro grid and
that essentially provides an opportunity
[43:30]
to power the building through either a
battery system or a portable generator
[43:36]
to ensure key functions um in the event
of prolonged power outage or other
[43:41]
shelter in place um requirements. And
that allows both our building residents
[43:45]
as well as other folks in the
neighborhood to have a um a place of
[43:50]
refuge where you can charge your phones,
store medication, get relief if it's
[43:56]
very hot out, um receive essential
supplies, and also receive emotional
[44:00]
support.
Now, we didn't do a design of the
[44:05]
building because again, it's a it's a
massing study, but we have included
[44:08]
these precedent images just to give a
sense of what we're thinking in terms of
[44:12]
architectural style, uh, materials,
colors, and again, this um the scale of
[44:18]
the building and how it relates to the
site and the open space.
[44:25]
our uh financing package and and as we
heard includes um tax credits, taxes and
[44:31]
bonds and this state program which we
fondly refer to as ASIC, the affordable
[44:36]
housing and sustainable communities.
It's not the only way to fund this
[44:40]
project, but um the exciting part about
ASIC is it comes with housing funds and
[44:45]
also transportation grant funds. Um SAHA
has been very successful using this
[44:51]
program. We've built six communities so
far with this money from San Jose to um
[44:58]
uh to to Napa and with Berkeley and
Oakland in between. And so in addition
[45:04]
to the housing funds, you can include a
package um for things like station
[45:09]
connectivity, bike ped improvements, uh
transit passes. Up in the corner, you
[45:14]
can see some of the improvements we were
able to do in San Jose. And it will also
[45:18]
fund uh fund um community events, you
know, such as street closures um and
[45:24]
festivals.
>> And thank you, Eve. Do you have any
[45:26]
closing comments? Because
>> my time is up.
[45:29]
» I heard I heard a little dinging over
there. That [laughter]
[45:32]
» Well, in conclusion, I will just say
that we are ready to get started. Uh we
[45:36]
would be delighted to work with you and
the community to see this project
[45:40]
through. [clears throat] Excuse me. Um
and we can certainly meet uh the
[45:44]
timelines that the city has established.
Thank you, Eid. Thank you, April. Thank
[45:49]
you.
>> So, I know I have some questions. I
[45:53]
think my questions are broad, but I will
hand it over to you first, but I just
[45:58]
want staff to speak to a moment. I was
thinking, and both Council Member Bushy
[46:02]
and I were on the planning commission
prior to being on the council, so we've
[46:05]
been in land use for a very, very long
time, and this seems like a really
[46:08]
unusual situation. I don't think I've
ever been on the receiving side of
[46:12]
hearing three incredible presentations.
So could you just speak to that because
[46:17]
it it does feel unusual and just to
maybe I don't know put that in context
[46:21]
for the community.
>> I I don't mind taking that as a startup
[46:24]
and really for my colleagues if you want
to add to that it it really is a unique
[46:28]
opportunity for Sanfell. I'm actually
excited to bring this forward and you
[46:32]
can see what a hard like I'll pick all
three. Um the the key is finding
[46:37]
location sites and lining up. And I do
think we really do have to look at
[46:42]
really our land assets a little closer
to see which ones we can evaluate over
[46:46]
time. It is one of our targeted ends for
our our housing program to really look
[46:51]
at city- owned sites really looking at
for surplus lands for affordable housing
[46:55]
development. I think I was most pleased
with the level and quality of developers
[46:59]
who put on uh this project and I think
it's really key about the size. We have
[47:04]
a lot of smaller portion parcels within
our that are on our own asset, but the
[47:08]
ability to assemble a larger scale
project near transit I think is really
[47:12]
why we got a nice robust kind of um put
for for the development affordable
[47:16]
housing development community. Uh you
got to remember this is the the top
[47:19]
three. We actually had five. Um so um
and I anticipate really evaluating other
[47:26]
potential projects to bring in this
level of developers if not others um in
[47:31]
the future. So, this here's really kind
of a unique opportunity, but and I said,
[47:35]
it really is a um a real opportunity to
try to bring forward needed housing to
[47:41]
this community. These developers uh are
been successful across the Bay Area and
[47:46]
even some have not done projects we're
in and they want to be and I'm I'd like
[47:50]
to try to find opportunities to broaden
our uh opportunities for multiple
[47:55]
developers to bring housing to this
community.
[47:58]
So just to follow up, so because the
city owns the site, we're having this
[48:01]
conversation because it could be a
private developer who wants to build
[48:06]
affordable housing and none of this
would be daylighted. They would come
[48:10]
forward and say this is we've chosen. So
again, for the community, this is a very
[48:14]
unusual situation, right? Am I correct?
Because the city owns the property.
[48:18]
» Correct. If this was private property,
in many ways it'd be simpler because
[48:22]
developers would simply say, "I'm
entitled to XYZ under these different
[48:26]
state laws." But because it's public
property, we have a little bit more um
[48:31]
flexibility in terms of shaping the
project. At the same time, we've agreed
[48:35]
to certain terms with the the county,
the the 80 units for example, and then
[48:39]
we've certain um citywide goals that
Alexis highlighted. So those are sort of
[48:44]
shaping the conversation, but um it's
much broader than say a private
[48:49]
development um proposal.
>> And I would imagine that there are other
[48:53]
cities that have this possibility of um
that owns a parcel and that they don't
[48:58]
have a public conversation that staff
goes and selects and then they just
[49:01]
bring it to the council for approval. So
again, we're adding something to the
[49:06]
process that's a little different. So
okay, because that's it feels different
[49:10]
to me. So, you want to start off with
questions and I have a bunch of broad
[49:13]
ones, but nothing specific.
>> Uh, well, I want to concentrate on one
[49:17]
particular area and uh just to um uh
follow up on um your comments. Yes, it
[49:24]
feels like we're on the other side of
the table um in making um these
[49:29]
decisions. Um my questions um are
focusing on the long term. Um and I
[49:36]
noticed we're we're approving a 99-year
lease. Um, and I'm wondering if is there
[49:43]
a general like highle plan for the 99
years? Um, is the plan that we're going
[49:50]
to build whatever structure is built now
will be repaired and maintained for 99
[49:55]
years. Um, will there be a rebuilding at
some point? What is the um what is the
[50:03]
the long-term concept? And then to
compare the different developers, my
[50:09]
question would be how long is each
develop how what is the longest duration
[50:15]
of any functioning site that they've
built to to compare them? How long have
[50:20]
they been functioning?
So th that's that's where my question
[50:24]
is. Um do should we have staff take a a
crack at
[50:28]
» I think I can try to respond to the
first part of the question then the
[50:31]
developing teams can probably answer
more specifically. Um, so I believe that
[50:36]
level th those kinds of details and
those terms are what the city and the
[50:40]
developer team would finalize as part of
their development disposition agreement
[50:44]
the next phase once we entered into the
exclusive negotiating agreement and
[50:48]
that's what we would later bring back to
council to approve
[50:52]
» in terms of like the the details for the
long-term vision of the project
[50:56]
long-term operations rather.
>> Okay. Thank you.
[51:01]
Did you want to hear how
>> everyone runs up? I'm not sure how we're
[51:05]
gonna do this.
>> Yeah, I guess [laughter]
[51:08]
» it's a little clunky. Sorry. As I said,
that's why I wanted to level set this in
[51:11]
the beginning. That's an unusual
situation.
[51:14]
» Um, well, so EA has been in San Rafll
since 1968. Um, and we own and operate
[51:20]
all of the developments that we've built
and keep them affordable in perpetuity.
[51:26]
Um, so when they come time for
rehabilitation or maintenance, we'll,
[51:30]
you know, um, go through the the typical
rehab process, maybe refinance, get some
[51:35]
tax credits, and upkeep the property.
Um, I think the latest one in Sanfell
[51:39]
was Centertown. We just rehabbed that
and looks great. Um, and to my
[51:44]
knowledge,
>> so I'm I don't think you quite exactly
[51:48]
answered my question.
>> What is the longest duration of a
[51:52]
functioning site that you've had? not
how long you've been here.
[51:56]
» Okay. Uh I think our first one came
online in 1972
[52:01]
and we still own it.
>> It's in Marin somewhere. I believe it's
[52:05]
in Sano. I have to check. We We have a
lot. Our portfolio just in Marin is over
[52:11]
2,000 units and we've got over 14,000 in
our portfolio. So, but we our first
[52:17]
property we do still own it was from the
early 70s.
[52:20]
» Thank you.
>> Yeah.
[52:21]
» Thanks.
[52:25]
Thank you.
>> Hello, I'm Dixie Bell, senior director
[52:28]
of real estate development for Eden
Housing. Our first born on property was
[52:33]
born in 1968 uh which was the founding
of um Eden. It's uh affectionately known
[52:40]
as JL around our office which is
Josephine Lodge uh lum and it's uh
[52:45]
located in Hayward. Uh it's been uh
rehabbed through the years three times.
[52:52]
So, um, we like our other colleagues
here, um, are very strong arm. We don't
[52:58]
sell. That's it. We just don't. We're
nonprofit developer and we'll go down
[53:04]
with the property as well. There are
times in which we've had to feed our own
[53:08]
properties and uh where the properties
can't sustain uh some sort of damage or
[53:14]
some sort of uh the operations doesn't
uh doesn't sustain uh the operations of
[53:20]
it. some Yes. And we have to write those
checks because the most important thing
[53:25]
is that our residents are served with
clean housing. It's uh and and we're
[53:32]
there. We are there. We have we have fed
properties for many years until we could
[53:38]
find a state funding program that could
help uh renew the properties. So,
[53:43]
» and just for clarity, when you say you
fed properties, you mean that you used
[53:48]
corporate funds?
>> We used corporate funds
[53:50]
» to Thank you.
>> Absolutely.
[53:52]
» Thank you, Dixie.
[53:57]
» Thank you. So, uh Saha similar vintage
our original buildings uh were the first
[54:03]
building was completed in 1968. The
vision at the time was to do five
[54:07]
buildings that with one that was
slightly larger that would serve as a
[54:11]
hub. everyone could come and have
services and activities and then four
[54:14]
smaller um properties in the vicinity um
were kind of feeding into that. Um those
[54:21]
were all located in Oakland. They were
originally financed through HUD and so
[54:26]
you know they were simple modest design
but they have held up remarkably well.
[54:31]
They have been continuously operating
and tenited and beloved by residents.
[54:36]
Um, and they have been renovated and
some of them were renovated about 10
[54:40]
years ago and are still looking
beautiful. And we're sort of finishing
[54:44]
out the final two that um, well actually
there were originally five and then
[54:49]
there were about three more that came
along in the early 70s and so we're
[54:52]
finishing out rehabs on those. So some
of those buildings have persisted as
[54:57]
very nice communities for over 50 years
without having a major capital um,
[55:04]
investment. they've been things have
been, you know, the units get turned
[55:07]
every time someone moves out. We've
replaced boilers, we've replaced roofs,
[55:11]
we've done painting, but in terms of
doing a fullscale large renovation that
[55:15]
requires people to move out. Um, in in
some cases, buildings have been um very
[55:21]
functional and comfortable for 50 years.
>> Thank you.
[55:24]
» Thank you.
>> That's your one. Okay. Well, I have a I
[55:28]
have a couple questions and they're for
the staff just more um understanding. I
[55:32]
think it applies to all three of these
incredible proposals. So, one of the
[55:36]
applicants talked about the sanitary
district easement. So, is that something
[55:40]
that um I'm just wondering how that's
going to manifest in this project
[55:43]
because we do have time to work [snorts]
with them.
[55:47]
Yeah, that's really um it's part of the
the selection of the the development
[55:53]
partner is to understand really the due
diligence standpoint or the I guess the
[55:59]
parameters for the development of the
project moving forward. You know, there
[56:02]
is an opportunity to modify that
easement. There is or is not. It really
[56:06]
depends on the ability of the the
district and desire, but it's also to
[56:09]
look at the utility pieces, design uh
approaches, neighborhood feedback that
[56:14]
really will shape a lot of the project
and their approach. Um, but I, as I
[56:19]
said, I if there's any specific
questions related to it seems like, you
[56:22]
know, um, the designers actually
acknowledge that and like they was part
[56:27]
of the package information that we put
out in the RFP. So, it really is just
[56:31]
kind of project approach. Um but it does
require you know coordination and we
[56:37]
actually um have been coordinating with
philos valley sanation district on
[56:40]
multiple projects um resolving various
easements. Pione is also another factor
[56:45]
for this site. So it's just really just
kind of recognizing the development
[56:49]
constraints. Um we are actively engaged
in this because at the end of the day we
[56:54]
want to deliver housing in this
community. So we are working with that
[56:57]
end but um it's really is up to other
decision makers and then constraints
[57:02]
that come about. So
>> okay so in the RFP um there was a
[57:07]
discussion about neighborhood
improvements. So I'm curious the staff
[57:11]
was looking at that you don't have to go
through the rubric that you used but was
[57:14]
that part of it that so be transit or
sorry access to transit or pedestrian or
[57:21]
whatever that might be. Was that already
one of the criteria?
[57:26]
» Um, no. It wasn't explicitly requested,
but it it fell under I I think the the
[57:31]
proposal scoring criteria.
>> Okay.
[57:34]
» And as through the the last 10 months or
so, one of the themes was what from the
[57:41]
adjacent community was are there any
opportunities for benefits to the larger
[57:46]
neighborhood beyond just the provision
of housing? and uh Eden proactively
[57:51]
identified formalizing that smart
pathway the pathway to the smart station
[57:56]
and should that the city are I
understand our public works department
[57:59]
is are is pursuing that independently so
if um when when uh one of the follow-up
[58:06]
questions was okay if the city is able
to address that um is there are you is
[58:12]
even capable of um improving bicycle and
pedestrian improvements along Maryale um
[58:18]
the other direction and they they
responded yes. Um we have heard from
[58:23]
some of the the other teams that they're
familiar with the same some of the same
[58:26]
funding sources. Um but it was that uh
Eden proactively identified that in
[58:31]
their proposal
>> and that's something when you did the
[58:32]
ENA that could also be talked about with
Okay Zen. Okay. So there was um people
[58:40]
some of the developers um alluded to
unit mix about threebedroom two-bedroom
[58:44]
was that again another part of the
criteria. Is there something that the
[58:47]
city with your expertise that we want
this many threebedroom, this many two,
[58:51]
this many one or studio or was it more
let's see what comes forward and what
[58:58]
came forward does it match with what you
all are thinking we should be asking
[59:01]
for.
Yes. So, we weren't prescriptive in um
[59:07]
the number of bedrooms uh that we were
looking for, but we did direct um
[59:12]
applicants in our sort of workshop
before, you know, when the RFP was
[59:17]
released before submissions were
received um to look at the needs
[59:21]
identified in our housing element needs
assessment. And one of those needs is
[59:25]
rental housing for larger families. And
so, um, the top three proposals were,
[59:32]
um, responsive to working in those
three-bedroom units. Okay.
[59:36]
» And so, that was a that was also a
factor, a positive factor.
[59:40]
» Okay. So, that was included. So, on a
related, is it your expertise, and maybe
[59:44]
the applicants would know better, do the
number of units ever influence the
[59:48]
ability to get financing? I mean, you're
talking about how this works for what we
[59:52]
have identified as needing our
community, but you got to be able to
[59:55]
build the thing. So is there ever a
correlation to the unit mix and types of
[59:59]
financing or not really? and my I don't
know if that's a question you can answer
[1:00:03]
or the
>> so the the best people to answer that
[1:00:06]
question are over here but I will tell
you that um yes my understanding is for
[1:00:11]
instance like the ASIC opportunity that
was mentioned there's a certain sweet
[1:00:15]
spot based on the last nine rounds of of
you know the number of units and so um
[1:00:19]
our developers certainly were looking at
um you know plugandplay what's what's
[1:00:24]
going to work right um but yes again
they can definitely expand
[1:00:28]
» I saw nodding heads okay it seems that
way But again trying to look at all the
[1:00:32]
different aspects of this. Um another
question is around sustainability
[1:00:38]
features. So um s was talking a lot
about the sustainability. Was that
[1:00:43]
another part of the again I know the RF
is written a certain way but I'm curious
[1:00:47]
how staff responded to that because
sustainability is important to the city
[1:00:51]
of Sanfal. We have it in our goals and
objectives. So I'm curious how that
[1:00:55]
plays out in these applications. Um I
believe that was one of the similarities
[1:01:00]
across the three proposals. There might
be distinct approaches unique to each.
[1:01:04]
Um but you I feel like you're
encountering some of the ch same
[1:01:08]
challenges the review panel encountered
that we had three strong proposals that
[1:01:11]
had some significant similarities.
>> So again just also understanding that
[1:01:16]
when we get when it gets to the ENA
those are also things that can be talked
[1:01:21]
about as it's important to the city.
Okay.
[1:01:26]
And talked about that and then director
Engle I think you alluded to this
[1:01:30]
because Saha has done a lot of work in
the region um but hasn't done anything
[1:01:35]
in Marin and I'm curious from a staff
standpoint from a development standpoint
[1:01:41]
how does that I mean how do you react to
that having folks that have been here a
[1:01:44]
very long time that know Samal to
someone who's new but also been
[1:01:47]
successful and I know it's part of that
grappling of the review panel but I'm
[1:01:50]
I'm curious about that
>> um I think like for all housing
[1:01:54]
development we're looking for who can
deliver a project. Um, you know, we've
[1:01:59]
gone through this whole proposals for
many years for Sanfell of entitlement
[1:02:03]
but not constructed. So, for me,
bringing in um
[1:02:08]
seasoned development groups that
actually can build and have housing
[1:02:11]
occupied, that's that's really what
we're looking for. So, um, both, you
[1:02:16]
know, existing uh, partners who have
been working Marin and Center for a long
[1:02:20]
time, they've continuously done, but
even for outside groups, we welcome them
[1:02:24]
all. Um really what's the bigger
question is what's what's Marin County
[1:02:28]
need? We need all housing. Um okay. And
really trying to find ways to get this
[1:02:33]
particularly affordable housing. So
that's why this you know kind of does
[1:02:36]
open the door for us to be strategic
about our approaches really looking at
[1:02:40]
what other opportunities do we have
within this community to find ways to
[1:02:44]
bring in multiple development partners
to bring this type of housing to the
[1:02:47]
community.
>> That's great. That's very helpful. And
[1:02:49]
then my last question is and I know for
sure each of the applicants referred to
[1:02:53]
this the whole financing what do they
call stack of it. So we know that
[1:02:59]
because these three have come forward
that you all looked at those financing
[1:03:03]
stacks and that like these are all
achievable. I mean for us we don't have
[1:03:06]
enough information to Okay, because that
is to your point, director, we have to
[1:03:11]
be able it has to be able to be able
Okay. So there wasn't a certain type of
[1:03:19]
financing stack. It's just that it made
sense to what we're asking for.
[1:03:23]
» Yes. And and what I would say is these
developers, all super experienced, all
[1:03:29]
developers who work with tax credits, um
and had a lot of similarities in the
[1:03:36]
types of funding that they identified.
And I think one of the things that we've
[1:03:39]
seen with projects, affordable housing
projects, is um there's
[1:03:46]
the funding is also we're in a moment of
change with state funding. And so I
[1:03:51]
think like everyone has identified
multiple opportunities. You saw one
[1:03:54]
proposal that had like four different
scenarios. Um and so it's kind of like
[1:03:59]
depending on how the dust settles,
>> we're going to, you know, we're going to
[1:04:03]
go with um one of those funding
scenarios and and there were um similar
[1:04:07]
buckets identified across the teams.
>> Okay, that's helpful. I don't have any
[1:04:12]
questions at the moment. Do you have any
other council member Bashi? Okay. So,
[1:04:16]
with that, uh, we'll open up public Oh,
yeah. Sorry. City Manager Natio. Yeah.
[1:04:24]
» Yeah. Thank you. Uh, Paul Natio, city
manager, as we move to the public
[1:04:28]
comment, I wanted to go back to Mayor
Kate's comment about, uh, this being an
[1:04:33]
unusual process. Um, just want to add
two more points. Uh, one, we're the
[1:04:38]
owners of the property. Um, so that has
certain implications. Um, also, uh,
[1:04:46]
because we went through the RFP process
and received some really strong
[1:04:50]
proposals, we're also in this position
because if any one proposal was head and
[1:04:54]
shoulders, uh, we may be bringing that
right to the city council. Um, the other
[1:04:59]
part is wanting to have as transparent a
process as possible. We could have had a
[1:05:06]
um ad hoc subcommittee that's not
required to meet uh under the Brown Act,
[1:05:11]
but we chose to set it up this way in
order to have as transparent a process
[1:05:15]
as possible. So that with that comes
some challenges.
[1:05:20]
» Thank you. And I think it makes sense. I
think then everyone understands what a
[1:05:23]
good um issue to have of these three
fantastic options.
[1:05:28]
Um okay, so I'll open up public comment
and as usual it's two minutes. You know,
[1:05:33]
there's a timer. You're welcome, but not
required to say your name and what part
[1:05:36]
of Sanfell you're in. And you can both
provide comments or input or question.
[1:05:40]
We are interested in what you have to
say.
[1:05:45]
» Good evening. My name is Ken Dickinson.
I'm a Sandrafell small business owner
[1:05:48]
Bay Area Computer Training. For over 20
years, I worked directly with EH Housing
[1:05:53]
as their enterprise systems trainer.
From former CEO Mary MAG down to the
[1:05:58]
property and maintenance teams on the
ground across California and Hawaii.
[1:06:03]
I've seen how they operate.
That matters because a permanent
[1:06:07]
supportive housing unit is only a home
if someone is there to keep the tenants
[1:06:11]
stable in the building safe. The June
2023 UC Berkeley Turner Center study,
[1:06:18]
which Eden and Saha both participated
in, found that understaffed supportive
[1:06:23]
housing suffers nearly double the rate
of rental delinquencies. And yet Eden is
[1:06:28]
proposing 111 units with no documented
on-site staff planning that I could see
[1:06:33]
in their proposal. EA is the only
finalist that answers this. A full-time
[1:06:40]
resident service coordinator, a
part-time case manager through Episcopal
[1:06:44]
Community Services and a rent-free
on-site manager unit guaranteed for the
[1:06:49]
full 99-year lease. That's not a
brochure promise. It's a staffing
[1:06:54]
commitment on paper for the life of the
building. Eh also wins on every other
[1:07:01]
front. Deepest affordability at 45% AMI
so residents can actually stay housed
[1:07:07]
the lowest cost per unit. A three-story
design that fits ordinance 1979's
[1:07:14]
negotiated height limits.
the neighborhood already bought into
[1:07:19]
that proposal there and a faster
timeline that avoids the litigation risk
[1:07:24]
and six figure per unit penalties tied
to Eden's high density design which by
[1:07:30]
the way they have the option to expand
that as I understand it six stories
[1:07:35]
they're local accountable already proven
in neighborhoods like ours for 350
[1:07:40]
mirale I urge this subcommittee to
support EAH housing thank Thank you.
[1:07:49]
» Thank you.
And thank you for providing very
[1:07:52]
specific input. And what I'm thinking
again, this is such an unusual
[1:07:55]
situation. So after we have all the
public comment, so each of the the
[1:07:59]
applicants will have an opportunity to
not have a long speech, but two or three
[1:08:03]
minutes to just maybe respond to what
you're hearing because um especially if
[1:08:06]
it's that specific. So thank you. Go
ahead, Mariana.
[1:08:09]
» Good evening, uh council staff. Um
[clears throat] I am Marian Nanastad
[1:08:16]
from San Rafal Meadows and um
[clears throat] I first want to comment
[1:08:21]
on the community engagement that both
Mr. Hinkle and each of the presenters
[1:08:25]
have presented that I am looking forward
to that we will have uh community
[1:08:30]
engagement with this. So thank you.
While density is a valuable goal, the
[1:08:35]
primary mission of the 350 Midel project
is to provide a permanent home for our
[1:08:41]
unhoused and special needs neighbors.
For this mission to succeed, EAH housing
[1:08:46]
is the only developer that has submitted
a proposal built on operational reality.
[1:08:52]
The June 2023 Turner Center study, which
actually included data from the other
[1:08:57]
finalist, reveals that under re
underresourced properties with fewer
[1:09:01]
on-site staff suffer from nearly double
the rate of rental delinquencies and
[1:09:06]
significantly higher moveout rates.
Without intens intensive on-site
[1:09:11]
stewardship, the most valuable residents
are at high risk of cycling back into
[1:09:16]
homelessness.
Eahh proposal directly addresses these
[1:09:20]
risks. First, they target the deepest
level of affordability with an average
[1:09:24]
of 45% AMI, ensuring units remain re
[clears throat]
[1:09:29]
uh reachable for those with the greatest
needs. Second, they are the only
[1:09:32]
finalist to document a clear tiered
on-site support team, a full-time
[1:09:36]
resident services coordinator, a
dedicated case manager through Episcopal
[1:09:40]
Community Services, and a rent-free
on-site manager unit to ensure 247
[1:09:45]
building stewardship. A 99-year lease is
a century long commitment. We should not
[1:09:50]
select a developer offering a vague menu
of services without a documented
[1:09:54]
headcount. I urge this sub subcommittee
to prioritize long-term stability over
[1:09:59]
mere units counts by advancing the EA
proposal. Thank you.
[1:10:05]
» Thank you.
[1:10:11]
» Hi, my name is Jennifer Wallace. I don't
know if it's possible to go to the Eden
[1:10:15]
deck uh and bring up the slide where
they showed the rendering from the yard
[1:10:20]
if that's possible while I make some
comments. Um I too support the EAH
[1:10:25]
proposal. They seem to have addressed
all the elements in the most balanced
[1:10:29]
way and um you know really excited to
see their commitment to the
[1:10:35]
environmental aspect of this and um
really loved the concept of the three
[1:10:41]
stories you know uh and the reason I was
hoping to bring up the Eden deck is that
[1:10:46]
rendering from that was my house by the
way in the picture um that's not what
[1:10:51]
five and six stories looks like and to
count in their rendering that was is a
[1:10:55]
six-story building that they modeled and
that's not what five and six stories
[1:10:59]
looks like from my backyard and from our
street and a couple streets over. It's
[1:11:04]
it's a lot more imposing than that. So
what I saw from the EAH version and also
[1:11:10]
understanding that designs can shift um
but but that their opening approach was
[1:11:17]
recognizing the neighborhood feel and
trying to fit into that as the other
[1:11:22]
apartments do along Maryale already at
two and three stories plus also
[1:11:27]
addressing parking all the other
elements. Um really appreciated that. So
[1:11:31]
thank you.
>> Thank you.
[1:11:40]
Good evening. My name is Gregory Andrew
and I live in Sanfell Meadows. And um I
[1:11:44]
think you just heard uh three very
powerful and compelling reasons to
[1:11:49]
support the EAH uh uh proposal and uh
select EAH as the developer for this
[1:11:55]
site. I uh find that after reviewing
these that uh the eh proposal would be
[1:12:00]
the most uh affordable housing for the
targeted population and it would be the
[1:12:06]
most compatible with the neighborhood. I
think what you have before you is a
[1:12:11]
choice of uh we do own this property and
so there is an opportunity to develop a
[1:12:20]
site that is compatible with the
neighborhood or a project that imposes
[1:12:26]
upon the neighborhood. And I find that I
find that the uh the Eden and Saha
[1:12:32]
developments seem to be out of
character. they're too big and just
[1:12:36]
their look of them are out of character
with the neighborhood. I did hear EAH
[1:12:40]
talk about the environmental approach
and utilizing um uh what's already
[1:12:46]
there. I found that to be very uh
interesting. I also heard EAH make
[1:12:50]
reference to the pedestrian path. So I
don't think that is unique to uh to uh
[1:12:57]
actually all three of them did. So I
don't think that is unique to Eden. I
[1:13:01]
have uh some questions I'd like to
address and I'll hand these over to to
[1:13:05]
the staff which is what uh what were the
proposals of the two developers that
[1:13:09]
were not selected in finalists Pacific
Companies and Samuel Group please give
[1:13:13]
us some detail on those proposals uh a
pedestrian path for the smart Meridale
[1:13:19]
smart station was not part of the EF
RFP. How was it that Eden came to to
[1:13:24]
propose developing this path and were
the other developers aware of this? Um
[1:13:29]
the evaluation group, the evaluation
committee panel was uh city, county and
[1:13:35]
chamber of commerce. So with the chamber
of commerce, why was no community
[1:13:39]
neighborhood u representative where
there there could have been and there
[1:13:43]
should have been. So why don't you
finish with No, go ahead and finish your
[1:13:46]
questions because this is a chance
>> and then uh what I'd like to see more
[1:13:50]
detail on the development scores. You
summarized them. They were Eden and EAH
[1:13:55]
were extremely close. So I'd like to see
uh if I could the details on those
[1:14:00]
developments on those scoring. That's
it. Thank you very much.
[1:14:05]
» Okay. Thank you.
>> Other questions or comments?
[1:14:18]
Good evening. My name is Janet Shirley
and I live two blocks from the 350
[1:14:23]
Midell site in Sanfeld Meadows.
I'm here to not to talk about floor
[1:14:29]
plans or how many units. I'm here to
talk about what happens after the ribbon
[1:14:34]
is cut on this project because that's
when the project actually becomes
[1:14:39]
somebody's home.
I've watched our city change. I've
[1:14:43]
watched buildings go up with big
promises that disappear once the
[1:14:48]
developer moves on to the next site.
What I haven't seen enough of is a
[1:14:54]
promise to actually stay, to have
someone on site when a senior falls or
[1:15:00]
when a crisis develops at 2:00 a.m. in
the morning.
[1:15:04]
EA
is the only proposal with full-time
[1:15:09]
onsite staff and a resident manager who
actually is going to live there, not one
[1:15:15]
who simply clocks in and clocks out.
It's the only one reaching the deepest
[1:15:20]
affordability so that families who need
this housing most can afford to stay.
[1:15:27]
And it does this at the lowest cost to
taxpayers in a design that fits the
[1:15:33]
scale that this neighborhood already
agreed to and wants. This community
[1:15:38]
deserves more than just a building. We
deserve a partner who will be answering
[1:15:42]
the phone year after year after year for
years to come.
[1:15:48]
not just a partner who wins the bid. So
when this council weighs these
[1:15:53]
proposals, I'm asking you to look past
the rendering and the unit counts. EAH
[1:16:00]
housing is local.
EH housing has already proven itself in
[1:16:05]
our neighborhoods
and EH EAH housing is the only finalist
[1:16:11]
that has built in the promise of
long-term care into its proposal instead
[1:16:16]
of just a pitch.
Because the difference between a housing
[1:16:21]
project and a home isn't the number of
units, it's whether somebody's there to
[1:16:26]
answer the door year after year.
I urge you to select eh housing as the
[1:16:33]
developer 3 for 350 Mary. Thank you.
>> Thank you. And to be clear, we're not
[1:16:37]
making any selection this evening, but I
appreciate the phrasing. Okay. Just want
[1:16:42]
to make that very clear. Anyone else?
[1:16:49]
» My name is Wayne Rabin. I live in San
Meadows. Good evening members of
[1:16:53]
subcommittee staff.
While Eden Housing has rec been
[1:16:58]
recognized with its 111 units density,
we must look beyond physical blueprints
[1:17:04]
and long-term operation safety. Despite
pre o proposing the largest, most
[1:17:09]
expensive project at $98 million. Eden
proposal fails to document a dedicated
[1:17:15]
on-site manager or residential service
staff member. We cannot run highdensity
[1:17:21]
housing on autopilot. The June 2023
terror center report, a study Eden
[1:17:28]
itself participated in, reveals that
underresourced, understaffed properties
[1:17:33]
suffer nearly double the rate of rental
discrepancies, delinquencies, and
[1:17:38]
sufficiently higher early exit rates.
Without trained on staff personnel to
[1:17:44]
bring community and descalate
crisis, these projects face severe
[1:17:50]
tenant instability, rapid staff burnout
and costly property damagement
[1:17:55]
preventable by fires and flooding. So
developers as developers present the
[1:18:01]
proposal tonight urge the subcommittee
to demand absolute transparent team
[1:18:06]
regarding the staff and gap. Before we
proceed the developer section this fall,
[1:18:11]
we must secure binding commitments for
on staff staffing, headc counts,
[1:18:17]
accountability measures, and operational
budgets. We must prioritize long-term
[1:18:22]
neighborhood safety and tenant safety
over mere unit counts. Also, needen has
[1:18:29]
the most units. More units equal more
traffic, which we do not need.
[1:18:37]
Thank you. Any other comments?
[1:18:46]
» Good evening. Uh Joe O'Hare and I'm a
36-year resident of the eastern part of
[1:18:52]
San Rafell and Peacock Gap. Uh I was the
former CEO of Vivivalon. And when I
[1:18:58]
retired, I decided what I was going to
do with my volunteer community service
[1:19:03]
work. And what was presented by the
staff at the beginning of this
[1:19:07]
presentation is what really made me
passionate about working and trying to
[1:19:12]
get more affordable and the right type
of housing in in uh in San Rafale and in
[1:19:17]
Marin County. Um as a result um I went
on the board of directors of Eden
[1:19:23]
Housing. I've served there for three
years and I'm also on the board of
[1:19:26]
directors of Calmer and Home which is a
strategic collaborative initiative of 40
[1:19:32]
nonprofits with the intent to try to
remove the barriers so we can build more
[1:19:38]
affordable and workforce housing in all
of our communities in Mirin. Uh why Eden
[1:19:45]
Housing? Why did I choose them?
Obviously I did a project with them. I
[1:19:48]
spent 15 years working with them as the
city did in building the the healthy
[1:19:53]
aging campus in downtown San Rafale and
I welcome anybody to go look at uh the
[1:19:59]
residents, talk to the residents there,
see what's done there. The mission of
[1:20:02]
Eden Housing is home is just the
beginning and if you go over and see
[1:20:07]
what the services and the support and
the full-time resident services that are
[1:20:10]
there, it'll answer many of the
questions that the community has. Um,
[1:20:15]
also the city has worked with Eden
Housing. As pointed out, we've we've
[1:20:19]
built over a hundred affordable housing
units. Not only that one, but the one in
[1:20:22]
Cass Canal. They have over 200 other
projects in development.
[1:20:28]
And I can tell you that um when we were
selecting our affordable housing
[1:20:32]
partner, I spent a year going all over
the Bay Area and looking at affordable h
[1:20:36]
nonprofit affordable housing developers.
And when we just kept coming back and we
[1:20:41]
did an RFP like the city did and we
selected Eden Housing because we saw
[1:20:46]
they were problem solvers. They're in
their communities for a long period of
[1:20:50]
time. And uh I I do believe and I will
tell you all that as a board member and
[1:20:55]
as a resident, I'll make sure that this
project is the best that it can be and
[1:21:00]
be as good as the one we did at at the
Healthy Aging Campus. Thank you.
[1:21:05]
» Thank you.
Anyone else like to speak?
[1:21:18]
» Good evening, mayor, council members,
staff. My name is Nicole Gardillo. I am
[1:21:23]
a field representative with the North
Coast State Carpenters Union at Lago
[1:21:26]
751, which covers Marin County. I'm here
tonight to talk about labor standards
[1:21:32]
and why it should be implemented here in
San Rafael. We all agree that we need
[1:21:36]
more affordable housing in Min County,
but we must also pay attention on how it
[1:21:40]
is built. Meaningful labor labor
standards in play means that there will
[1:21:45]
be responsible con contractor that
provides livable wages, health care, and
[1:21:50]
apprenticeship programs that may help
build the future. These are not just
[1:21:55]
protection for workers. They are
investments in the quality, safety, and
[1:21:59]
durability of the structures that are
being built for our community. Let us
[1:22:04]
make sure that this project reflects our
city's values. Please ensure that this
[1:22:09]
project will be built by a responsible
contractor that includes labor
[1:22:12]
standards. Thank you.
>> Thank you.
[1:22:18]
Any other comments or questions that
anyone has?
[1:22:24]
Okay, I don't see any. I'll close the
public comment. And as I said at the
[1:22:28]
beginning, I would have thought about it
in the very beginning, but as I said,
[1:22:31]
it's an unusual proceeding. Um, I would
like to give the each of the applicants
[1:22:36]
an opportunity just to say a few more
words. You you heard public comment.
[1:22:39]
You've been sitting there thinking about
other things like, "Oh, I should have
[1:22:41]
said that or I'd like to say this." This
is your chance to do that. And we'll
[1:22:45]
just go in the same order. So, Nor, if
you want to go up or or someone from
[1:22:50]
your team, however you want to do it.
>> Uh, no, thank you. uh just really
[1:22:55]
appreciate this opportunity
um to be here. I agree this is um unique
[1:23:01]
um for San Rafll to go through this
process, but I think it's great. I will
[1:23:04]
say um I've gone through some similar
processes now in other cities where they
[1:23:09]
put out an RFP and we come and do this
and so uh you're right in line with with
[1:23:14]
a lot of other cities doing a lot of
really cool things. So
[1:23:16]
» very awesome. Um uh I I think really the
only other thing I wanted to mention was
[1:23:22]
um you know we even though we're waiting
to see this process through we are still
[1:23:27]
you know wanting to consider our own due
diligence as well. And so you know we
[1:23:30]
are in touch with the Lascalina sanitary
district I would like to also find out
[1:23:34]
what that easement is if it's necessary
not necessary you know that is why we
[1:23:39]
designed it in a way where um you know
we didn't have to worry about it should
[1:23:42]
they need it. Um but you know we are in
conversation with them and and we'll
[1:23:47]
we've sent them some of our plans just
so they can let us know like oh yeah
[1:23:50]
this is what we're doing with it or not.
Um uh and then um as far as uh you know
[1:23:56]
the the pedestrian path um I know that
that did come up and um yeah absolutely
[1:24:02]
like our goal um like I mentioned is to
make sure that we have good connection
[1:24:06]
to transit because our residents are
going to need it. Um and so it's just
[1:24:10]
very critical for us. Um, I will say the
the reason maybe we didn't bring up um
[1:24:14]
AHSC specifically in our funding stack
that you saw is because it is um uh for
[1:24:21]
now it it no longer exists. Um there is
a possibility maybe it'll come back in a
[1:24:25]
different form or they'll reverse their
decision on the greenhouse gas reduction
[1:24:29]
fund at the state but as of now um we
are not counting on AHSC. So, we wanted
[1:24:35]
to think through what else do we have
available to us. Um, and you know, we we
[1:24:40]
will also keep an eye on what kind of
funding will come through should Prop 1
[1:24:44]
pass on the ballot in November and the
programs that'll get funded, which will
[1:24:47]
include some infrastructure grant
funding. Um, so that might be a
[1:24:50]
possibility. Um, but again, you know, we
just wanted to make sure we had enough
[1:24:54]
paths forward where, you know, if one
didn't work, we had another one that we
[1:24:57]
could fall back on. And so that's why
you saw those four paths um and not the
[1:25:00]
the ASIC program in there. Um, don't
think I had anything else. If there's
[1:25:06]
any other questions that you had for me,
happy to answer those, but any I don't
[1:25:10]
know if the team had anything else to
add.
[1:25:13]
» Oh, yes. The Yeah, we we were very um
intentional about the adaptive reuse is
[1:25:18]
just, you know, something I'm very
interested in trying out um in our team,
[1:25:22]
Studio Tsquare, which we also worked on
on the Northgate Mall project. So
[1:25:25]
they're very um well verssed in the area
and in the in the land and the the law
[1:25:29]
itself and also the the connectivity to
transit um because they were our part
[1:25:33]
our thought partner there. Um but yeah,
we would love to keep exploring that
[1:25:37]
with the city because we we don't
actually know what the plan is for your
[1:25:40]
interim housing. And so if those are not
going to be around, that's okay. We'll
[1:25:44]
we'll figure something out. But if they
are available, it'd be great to think
[1:25:47]
through what we can do with those. um
you know as community center space um as
[1:25:52]
you know um just space for the the
residents to be able to to do really fun
[1:25:56]
activities um potentially use it for
neighborhood meetings that kind of
[1:26:00]
thing. So
>> yeah, thank you.
[1:26:01]
» Thank you. Thank you for that.
>> Tammy, do you want to speak or member of
[1:26:07]
your team? Thank you.
>> Hi. Thanks again. Thanks for having us
[1:26:10]
back to uh respond. Uh I heard three
things tonight uh about resident
[1:26:15]
services, the path to the smart train uh
station and the height of the building.
[1:26:21]
Um it is amazing to have this level of
involvement from neighbors um this early
[1:26:27]
in the process and thank you all for
coming um to express your concerns and I
[1:26:35]
uh would really encourage everybody to
take up Joe Joe's invitation to visit
[1:26:40]
Vivolon or to visit Kasa Canal because
you will see at those uh properties like
[1:26:46]
all of our 160 properties there are
on-site resident services managers who
[1:26:51]
live at the property 24 hours a day. So,
um we have on staff janitorial, property
[1:26:58]
management, resident services, and even
third party services whose jobs are to
[1:27:04]
be at our building 24 hours. I mean, not
well, it's se seven days a week. Um but
[1:27:10]
there is a 24-hour resident services
manager on site at all of our
[1:27:15]
properties. Um because that is um that
is the true because all of our uh our
[1:27:23]
residents need services and they need
support so that we can um keep them
[1:27:27]
there happily and sustainably. Um I'm
going to turn it over. Oh, I one thing
[1:27:33]
about path station. Our proposal
originally talked about establishing a
[1:27:39]
pedestrian connection from the property
to the path station. Uh the city got
[1:27:45]
back to us and said, "You know what? The
city's already thinking about this. If
[1:27:49]
the city should um find the money to do
this to do this path, would you consider
[1:27:55]
doing bicycle and pedestrian
improvements according to the city's uh
[1:28:00]
pedestrian and bicycle plan that go
north to San Pedro Road?" And that is we
[1:28:04]
said yes, and we will take a look at
that. Um I just wanted to clear that up
[1:28:08]
because I know there was two different
slides on that. And I'm going to turn it
[1:28:12]
over to Rick to talk about the height of
the building because
[1:28:15]
» just a short response out of my
wheelhouse.
[1:28:18]
» Okay. Just a short response.
>> Very short. So, one of the things we did
[1:28:22]
is we tried to show the uh we modeled
the building, placed it in the the site
[1:28:29]
so that people could get a real honest
appearance of what it looks like at
[1:28:34]
different heights. It was actually a
fivetory scheme that we modeled. We
[1:28:38]
actually modeled a six-story scheme,
too. and we saw the height of it and
[1:28:41]
lessened it. People get honest
tradeoffs. We did that with Bivivalon
[1:28:46]
and we do it with Fairfax Mil Valley. We
do it with all of our projects. So, they
[1:28:50]
get an honest review and it's very
transparent and if they ask us to take
[1:28:56]
it from the backyard, we will take the
image from the backyard and show it to
[1:29:00]
them personally. Um, also there are a
lot of people in the community of San
[1:29:05]
Rafale. The community isn't just along
Midell. it's within the whole city and
[1:29:12]
you're providing housing for the whole
community. So, there are tradeoffs to be
[1:29:17]
had. Do you how do you maximize the
value of the site for the city to use uh
[1:29:23]
their dollars in purchasing the
property? There are also community
[1:29:28]
members that will live here eventually.
And every time I complete a project, I
[1:29:34]
think, well,
yes, we took we got the project approved
[1:29:38]
and we took a story off the building and
we can do that and still achieve a high
[1:29:43]
unit count. If you remove 30 units from
the development and it's 80 unit
[1:29:49]
project, the one group of people you
don't ever have to ask a question or
[1:29:55]
answer a question of is why don't I have
a house to live in? and those residents,
[1:30:01]
future residents,
many of who might have already been
[1:30:05]
Sanfell residents
don't get to speak for that answer. And
[1:30:11]
I think that's a really important thing
to consider. So there'll be tradeoffs in
[1:30:14]
this process. Y
>> nobody's wetted to the new design and
[1:30:19]
each of the developers would do a good
job. we were a we decided to proceed
[1:30:25]
with a larger development so that we
could have the conversation, have the
[1:30:30]
tradeoffs and work with the community on
it.
[1:30:32]
» Thank you.
>> Thank you, Ray.
[1:30:35]
And then um Eve. Yeah. Thank you.
[1:30:44]
» Thank you again. I guess it just in
conclusion um I'd like you to take away
[1:30:49]
um from our proposal that you know Saha
has a very strong presence in the
[1:30:53]
region. We have an excellent track
record. We are a very hands-on um
[1:30:58]
organization and and developer. Myself,
my CEO and all our senior leadership
[1:31:03]
team are involved in these projects. We
have a really experienced staff. Um our
[1:31:08]
senior project manager Naan who's here
um has worked on several ASIC projects
[1:31:12]
and done really beautiful communities
again from San Jose to penol um and
[1:31:17]
we've augmented our team with uh folks
who have a long history in the city um
[1:31:23]
and a lot of local expertise. So April
Paley who will be part of our community
[1:31:26]
outreach and planning and design work
going forward as well as Chris Hes. Um,
[1:31:31]
and I do want to clarify that we have
budgeted for this project to have
[1:31:35]
full-time property management, full-time
services coordination as well as
[1:31:39]
maintenance. Um, and we do have capacity
within our services department to
[1:31:44]
provide case management for folks who
need a little extra support. We do have
[1:31:48]
um a licensed clinical uh social worker
who supervises all our resident service
[1:31:53]
coordinators so that they can get
support and um extra resources when
[1:31:58]
families or individuals are needing that
support. Um, we're also very adept at
[1:32:02]
working with other community partners
and we've already started that process
[1:32:05]
by communicating and reaching out to
Canel Alliance and Ritter Center to
[1:32:09]
think about, oh, folks need additional
help, what are the resources in the
[1:32:13]
community and sort of building those
connections um and broad-based community
[1:32:17]
support. Uh, one last thing is we do
have uh 24-hour coverage for maintenance
[1:32:23]
or other emergencies and we um have a a
way to we have a text system so that we
[1:32:30]
can communicate directly with residents
so folks can sign up to get alerts and
[1:32:33]
announcements from us about activities
um opportunities as well as important
[1:32:38]
safety alerts again if something
happens. A couple last fall we had a
[1:32:42]
tsunami warning um for the bay and uh we
immediately were able to push out to all
[1:32:48]
our residents who lived potentially in
that zone and let them know make sure
[1:32:51]
they had seen the county warnings um and
mobilize quickly there. So um again,
[1:32:56]
we'd love to work with you and we
welcome the opportunity to engage with
[1:33:00]
neighbors as soon as we can so that we
can plan um for their needs and be
[1:33:04]
responsive and deliver a really
outstanding project for the community.
[1:33:09]
Thank you.
Thank you and thank you for providing
[1:33:12]
that additional information. I think
it's nice to have the opportunity to add
[1:33:16]
in and to respond. So,
we'll bring it back for subcommittee
[1:33:22]
discussion and comments. I can see why
you wanted to bring all of us into this
[1:33:27]
conversation. This is not an easy one. I
do have two questions. Um, and maybe you
[1:33:31]
can just speak to this. There were
assumptions being made about who will be
[1:33:34]
living here and I know we have other
100% affordable projects in Sanfell and
[1:33:40]
so I don't know if the assumption is
always accurate that there are people
[1:33:42]
that were formerly homeless. So maybe
you could just speak to who the 80
[1:33:46]
people might be and it might change over
time. Um and then I would also be
[1:33:52]
curious what height is allowable by
current zoning standards.
[1:34:00]
Yeah, thank you for the clarifying
question. Um, because affordable housing
[1:34:05]
certainly can serve people who were
formerly homeless um or at risk of
[1:34:11]
homelessness. um but also often serves
um
[1:34:17]
every everyone really like um some of
the examples we gave we gave in our
[1:34:21]
slides right were home health aids and
um you know people who work retail or
[1:34:26]
people who are in food service or so
it's it's an expansive
[1:34:31]
group that can live there and is a part
of the community
[1:34:36]
» and so do our other affordable I'm just
saying center town are there um onsite
[1:34:41]
case managers because I I'm just trying
to figure out because I think that's a
[1:34:45]
really interesting comment that the
community talked about or on-site
[1:34:49]
property managers or just the stability
part the additional staffing. Do our
[1:34:52]
other affordable 100% affordable
projects have that.
[1:34:56]
» So I think it depends on the project and
the sort of level affordability and like
[1:35:02]
if there's permanent supportive housing,
right? So, permit supportive housing is
[1:35:05]
going to have an additional um layer of
support or like um more robust support.
[1:35:12]
Um and I think some of these proposals
had said,
[1:35:17]
you know, if vouchers become available,
we're happy to look at additional
[1:35:21]
permanent supportive housing, right?
Ramping that up. Right now, we don't
[1:35:24]
have that voucher availability. And so I
think that's why um it might have come
[1:35:29]
across as um unclear what the level of
services would be,
[1:35:33]
» right? Because I know that this project
when we when the city purchased property
[1:35:37]
was not to be permanent supportive
housing, which does have a higher level
[1:35:40]
of care,
>> right? And I will say um I believe all
[1:35:43]
three proposals noted that that they
were um targeting family housing. So
[1:35:47]
which is again a little bit different
than um individual PSH.
[1:35:56]
And I think the second question was
about height. I believe the default
[1:35:59]
maximum height for this zone is 36 feet
if I'm not mistaken. But under um state
[1:36:05]
density bonus law um affordable housing
projects are entitled to increase the
[1:36:10]
density on site and given its proximity
to transit and the level of
[1:36:14]
affordability. Um if this were a private
development for example, I don't believe
[1:36:18]
the city could impose any density
restrictions
[1:36:21]
» or any height restrictions
>> or a waiver. Yeah, they ask for height.
[1:36:23]
Height becomes a waiver concern, but
that's kind of the difference nuance on
[1:36:28]
this one is we actually do get an
opportunity to basically set kind of
[1:36:31]
like the scale and
>> size of this project. So,
[1:36:35]
» okay. And then we also had I'm looking
at my notes here. There were some
[1:36:38]
questions about going through the
projects not selected. I actually don't
[1:36:42]
want to spend subcommittee time. I can't
even parse through the three that we
[1:36:45]
have here. So, um but there was uh
information if you could share. I don't
[1:36:50]
know how much of that is public
information. So, if you could speak to
[1:36:53]
the to that didn't and I do realize
there's a proprietary aspect to these.
[1:36:57]
These are all pitches. So, I I again,
but if you could speak to that. So, we
[1:37:01]
already talked about um smart path that
was addressed. Oh, the resident uh again
[1:37:08]
for the finalist that there was a
chamber of commerce and staff, but why
[1:37:13]
there wasn't a community member? Never
heard of I don't know if we've done
[1:37:17]
that. Maybe maybe some of the developers
have experienced that in other cities.
[1:37:21]
As I said, this is a brave new world for
us, but if you could speak to that and
[1:37:24]
then the other one, oh, the development
score. So again, I know we're trying to
[1:37:28]
also be sensitive to the fact that that
some of this information is confidential
[1:37:32]
to the Anyway, but if you could answer
kind of those those questions and as
[1:37:37]
much as transparent as we can be.
>> Yeah, sure. So this uh we received five
[1:37:41]
responses. is the two that didn't rise
to the top. Um some lacked exper
[1:37:45]
experience that the these developer
teams have and some of the proposals
[1:37:51]
were maybe underdeveloped or they didn't
provide um any they didn't out identify
[1:37:55]
any community engagement or any
three-bedroom units. Some of some of the
[1:37:59]
factors that led to higher scores for
the other proposals. Um and then the the
[1:38:04]
panel consisted of of members that had
different um levels and different
[1:38:09]
specialties with housing background. Um
so even though we did have a member of
[1:38:13]
the Chamber of Commerce, they they had
affordable housing experiences which is
[1:38:17]
what they brought to the panel.
[1:38:21]
» And then
>> and then in respect to some of the
[1:38:23]
scoring or details and this is really
typical for the city when we do an RFP
[1:38:27]
process. uh those will become public
information or at least not proprietary
[1:38:31]
information once uh the council actually
selects a developer to move forward that
[1:38:36]
point then we could release additional
information because as we noticed some
[1:38:40]
of these competitive process RFPs maybe
the first one doesn't work out we know
[1:38:44]
the second one so we're still at give
that opportunity to uh select the
[1:38:48]
various groups um but that that's why
the information is put out once we've
[1:38:52]
actually made that selection and enter
into the NA and DDA so
[1:38:57]
Fantastic discussion or questions.
>> I just want to follow up just to to
[1:39:02]
clarify that if this property if the
site were being developed by a private
[1:39:07]
developer that had enough um concessions
there would be no height limit. The
[1:39:17]
sky's the limit.
>> No, it'd be a little different. We do
[1:39:19]
have density uh would be actually
because there is a density standard uh
[1:39:23]
outside the downtown. So there would be
a limitation based on the base allowance
[1:39:27]
density. Even when you put the the bonus
stacking on there, there would be a
[1:39:31]
limitation as compared to some of our
downtown zones.
[1:39:34]
» And do you have any idea what that would
be? That would be a number of units.
[1:39:38]
» Um there would be, but I I really always
feel when we start talking about things,
[1:39:42]
I think there's other factors that would
limit really this kind of like maximum
[1:39:45]
sky's limit approach and really is some
of the built infrastructure and also
[1:39:48]
what the site can actually handle. M
>> um so uh in this case it's a sizable
[1:39:53]
parcel but uh some of these questions do
come to play but there is actually a
[1:39:57]
height allowance a base density project
you would actually have to call out what
[1:40:00]
the maximum density allowance is for
this parcel I think we calculated in
[1:40:05]
like 140 range I can't recall off top of
my head but um there is there would be a
[1:40:10]
box that actually would have to
maintained if a um private developer had
[1:40:15]
acquired the site and move forward with
development of this
[1:40:17]
» okay thank
[1:40:21]
Now we're to the discussion part.
>> Trying to think how we can help um guide
[1:40:27]
the discussion. I I really want the
entire council to be up here because
[1:40:30]
this is uh very much a challenge. So I'm
trying to figure out how we can give
[1:40:34]
input that's helpful. Um it's well I'll
start because I'm already starting. Um I
[1:40:40]
I'm just thank you to all three
applicants that want to build and invest
[1:40:45]
in San Rafll. Um, I just want to start
with that. And this is a new area for
[1:40:50]
the city of Sanfal for us to be owning
this property. Um, and so as we find our
[1:40:55]
way through this process, whether you've
been working in Sanfal or you're new to
[1:41:00]
uh, working in here, I think you can
already tell that we care very deeply
[1:41:04]
about what's built here and what it
looks like and how it responds both to
[1:41:07]
adjacent neighbors, but as well as to
the entire community. I think that's a
[1:41:10]
good point. Um we've been doing this
work between us many many decades and
[1:41:16]
the reality is um any change in use
often is met with resistance for folks
[1:41:20]
that might be nearest and that's what it
is and recognizing that impact is real.
[1:41:25]
So, how do you balance? Uh, both of
those are true. Um, and this council has
[1:41:31]
been very very committed to having
affordable housing. And the fact we're
[1:41:34]
even doing this, 80 units at the very
minimum is a lot of units. And I and I
[1:41:39]
want to make sure that we don't in the
pursuit of perfection lose sight of the
[1:41:44]
fact that no matter what, we're going to
get 80 units because that is what our
[1:41:47]
agreement is. So, I want to just be
clear that for me that was um that's a
[1:41:53]
very important uh number that I'm I want
to say I'm fixated on but I'm thinking
[1:41:56]
about I we didn't talk about parking and
part of this is my other questions I
[1:42:02]
know get worked out I want to say worked
out but you have additional
[1:42:05]
conversations in the ENA what I heard
over all three was a willingness to take
[1:42:11]
in that input and a willingness to have
the project morph and as I said at the
[1:42:15]
very beginning and put um Eden on the
spot it's very difficult to s to believe
[1:42:21]
like oh we're going to take input when
you have really beautiful renderings
[1:42:24]
And again, it's hard for people unless
you're very wellversed in looking at
[1:42:29]
architectural drawings to understand how
those could be changed. And so, there's
[1:42:35]
always going to be a tension there. And
that's just the reality. So, thank you
[1:42:38]
for being brave and putting pictures on
the on in the document because I know
[1:42:42]
that soon as you put a picture out
there, people are going to start to
[1:42:45]
respond to it uh either positively or
negatively. Um, I'll just stop by saying
[1:42:50]
or close by saying I do think the
stability of the residents is a is a
[1:42:54]
critical part. And I recognize the folks
in this area. It's going to morph over
[1:42:58]
time. It's a 99-year lease. Hate to
break it to you, none of us are going to
[1:43:02]
be here. We're at the end of this,
right? And so, how do we have the
[1:43:05]
flexibility recognizing whether it's
service workers or our teachers or
[1:43:09]
nurses are going to be there. So, I
don't want to have it. It's not
[1:43:12]
permanent supportive housing. So, I
don't want it to be built that way.
[1:43:15]
That's a whole other realm. That is not
what we're talking about here. um even
[1:43:19]
though there are folks who have been
formerly homeless who will be offered
[1:43:23]
spots, but that that's very different
than 100% um permanent supportive
[1:43:27]
housing. The environmental aspect is
incredibly important. Once it's built,
[1:43:30]
it's not going away. So, um paying
attention to that and the designs, we
[1:43:34]
didn't get it in designs. We're not
going to do that to you. Setbacks,
[1:43:37]
things like that. I do think the
pedestrian experience as well as a
[1:43:41]
community experience is important. Um
and a lot of that can be addressed
[1:43:45]
through setbacks and through good
design. So that's why I didn't want us
[1:43:48]
to get hung up on design. And then I do
think uh having the character of the
[1:43:53]
neighborhood respected it. It's an
unusual site because it's very
[1:43:58]
industrial in some ways. You have an old
Chevron, you have fast food, you have
[1:44:03]
multif family housing, you have public
storage. There's kind of a lot going on
[1:44:07]
there. So having ultimately the design
and whoever's chosen recognizing that
[1:44:12]
you're in this liinal space between you
know the freeways on one side and how do
[1:44:17]
you recognize that there's an
established neighborhood there that has
[1:44:21]
its own architectural language and yet
this other buildings that are kind of
[1:44:25]
all over the board. I think that's
really challenging actually um from a
[1:44:29]
design perspective and this is not just
throw up a big box and call it a day at
[1:44:34]
all. So, um I'm actually really pleased
that the city will have the ability to
[1:44:38]
influence that design because we've seen
some other designs recently come across
[1:44:42]
that, um to me have not been as
respectful from what we want in terms of
[1:44:46]
good design. So, I know that's not all
helpful in terms of delineating. Um and
[1:44:50]
I'll just stop at one more thing. The
whole financial stack of it all and that
[1:44:55]
is it was talked about how that's a
changing landscape. Um I am fully
[1:44:59]
convinced that all three that presented
tonight would figure it out. you have
[1:45:03]
all had records of doing this for
decades and decades and decades and
[1:45:07]
you've been meaning you've been figuring
it out year after year after year. So I
[1:45:10]
am completely confident um that was
something that was really important to
[1:45:13]
me to hear and I heard that tonight. So
um so I like I agree with you all three.
[1:45:20]
[laughter]
Yeah, council member Busheen.
[1:45:24]
» I totally agree that would that would be
the simplest um thing would be to um
[1:45:29]
take all three of you because that you
all have um are incredibly qualified.
[1:45:34]
We're thrilled and honored that um you
have um um made the effort to um and and
[1:45:41]
they have the desire to be in San Rafel.
But we do need to make a decision um and
[1:45:47]
we can't have all three. Um, and I think
what would most help be most helpful
[1:45:52]
because as a subcommittee our job is to
give you staff direction for what will
[1:45:58]
be brought forward to the entire
council. So with thinking along that
[1:46:02]
what can I give you for feedback? Um, my
feedback is that I agree with your prior
[1:46:10]
or the way you're approaching it. the
items that you've listed on page three
[1:46:14]
about in the middle of the page um where
you say the strength of the proposal is
[1:46:18]
it would provide the most housing the
the reason I think that should be the
[1:46:24]
first um criterion addressed
the purpose of this is low-income
[1:46:31]
housing and one of the other groups the
the people who wouldn't get to live here
[1:46:36]
are one group that aren't here but in
addition
[1:46:40]
um the taxpayers of Marin County that
have provided $8 million that allow us
[1:46:46]
to be in this happy position of having
to choose which developer we want. Those
[1:46:53]
taxpayers I believe want the most value
for their investment and that's why I
[1:46:59]
think we should be focused on the number
of units in making sure that there are
[1:47:04]
familysiz units included in that mix.
But the the numbers matter here. Um we
[1:47:10]
we need numbers. Um we need many many
many units. So I think focusing on the
[1:47:16]
number of the units is the uh the the
the correct first criterion. And and one
[1:47:22]
the next one you have is parking which
is something we did haven't talked about
[1:47:26]
a lot about here although heaven help us
have we heard about parking for those
[1:47:32]
many decades. So, I I would offer for
the neighborhood consideration that park
[1:47:39]
off-site parking is a huge issue and the
the um amount of onsite parking is
[1:47:49]
extremely important and the
closely related to that is the ability
[1:47:57]
to get to transit so you don't have to
have so many cars. Um those two things
[1:48:02]
work together to um
uh keep the trans the transportation on
[1:48:10]
site that that can be and and provide
the neighborhood benefit of paths to uh
[1:48:16]
for everyone to use to get to transit,
not to mention the greater environmental
[1:48:20]
benefit. And then that that plays into
the the neighborhood improvement. And
[1:48:26]
finally, I think too you um maybe should
add a criterion that's been talked a lot
[1:48:31]
about today. The the next one would be
the on-site services. Um because as I
[1:48:37]
was listening to many of the um
specifics of the development,
[1:48:43]
particularly the environmental ones,
maybe it's because I come from the
[1:48:46]
electricity industry. I hear all these
things micro grids photobotic [laughter]
[1:48:52]
and it's like these are very complicated
very dangerous things. These are not
[1:48:58]
something even your on-site manager you
you need expertise
[1:49:02]
to maintain and to um be able to fully
utilize the resistant the resilience
[1:49:10]
potential of these facilities. And if
we're going to put these complex,
[1:49:16]
expensive,
and dangerous um items on these sites,
[1:49:22]
we need to have um staff with expertise
and training that are able to safely um
[1:49:29]
interact with these um features. So um
those are the criteria. That's how I
[1:49:35]
would approach it um for for the rest of
the council so that we have a way of um
[1:49:40]
looking at the information in a
sequence.
[1:49:42]
» And would you we had talked about units
but also bedrooms. I'm trying I'm trying
[1:49:47]
to figure out how we get at the mix
piece and I know you said they all had
[1:49:50]
the mix. Are you or would your response
to that be like that would be figured
[1:49:53]
out in the ENA?
>> Again, just trying to get our hands
[1:49:57]
around. Yeah, I think you have to look
at this is the concept plans that
[1:50:02]
they've kind of like for their own
project. What what if okay everything's
[1:50:05]
held equal. This is what we would
pursue. Okay.
[1:50:07]
» The hard part is really the due
diligence.
[1:50:10]
» What what capacity or what sewer
allocation? There's a lot of questions
[1:50:14]
that come into play
>> about getting there. So that's why it's
[1:50:16]
hard to get unit mix, but I think we
just that's why we really are focused on
[1:50:20]
the developer and then recognizing all
three developers could deliver what the
[1:50:25]
city is looking to deliver. Okay.
>> But we don't want
[1:50:31]
all, you know, a whole bunch of of um
studios, you know, exclusive studios. We
[1:50:36]
do want some family units.
>> Agree.
[1:50:39]
» At at some fraction.
>> Agreed. And then that's really made me
[1:50:43]
look at the percentages proposed to say
whatever the actual build approach was
[1:50:47]
the same percentages of the intermix of
units and then all three of them
[1:50:51]
actually gave a mix of units. So that's
why I said that's the benefit bit versus
[1:50:55]
just one single type. And we've seen
that uh in actual market rate projects
[1:50:59]
um coming in that were just one type of
unit typology.
[1:51:04]
» Any city manager? Anyone else want I'm
trying to figure out how we um don't
[1:51:09]
just have we can have a repeat of this
meeting, but I'm I'm trying to figure
[1:51:12]
out what the next steps would be. I know
in terms of these timelines, they're
[1:51:17]
very I mean the starting one was August
2026 and we're not selecting a partner
[1:51:21]
tonight and as far as I know August ends
in a week and a half. So I I'm just tell
[1:51:28]
all of us from what you've heard how you
want what's going to happen next. Is
[1:51:33]
staff going to make an a proposal of two
of the finalists maybe? I mean that
[1:51:38]
would be to me as opposed to having
three having maybe two I don't know but
[1:51:43]
I don't know.
>> You know I believe based on the input
[1:51:47]
provided from the subcommittee that
staff's prepared to actually bring
[1:51:50]
forward um a recommendation to council.
Um I think um as I said we we do have a
[1:51:58]
luxury of three qualified firms. Okay.
>> Um but I do believe we have um staff is
[1:52:03]
comfortable making a recommendation for
council. So
[1:52:06]
» Okay. And then being prepared to answer
or talk to the other ones. I'm sure.
[1:52:09]
Okay.
>> Yes.
[1:52:11]
» City manager. Anything else? Being that
this is a brave new world for all of us
[1:52:16]
in this room. Well, maybe not for the
applicants. They've been they've done
[1:52:19]
this before, but for us on this side for
a long time, right?
[1:52:24]
» No, I think uh staff's gotten some good
feedback both in presentations
[1:52:30]
and from the uh subcommittee. um we'll
work on uh most likely bringing forward
[1:52:35]
a recommendation to the full council
which ultimately uh will make the
[1:52:39]
decision and as we typically do with all
of our staff recommendations will likely
[1:52:45]
be our recommendation and maybe uh
option or alternative should the council
[1:52:50]
discussion
>> um warrant um going in that direction
[1:52:55]
» and will that be September October again
I'm just trying to not to put you can
[1:52:59]
say by the month you don't have to say
the exact meeting day because I know
[1:53:02]
there's a lot going on.
>> We would be targeting uh September,
[1:53:06]
October for bringing that forward
>> and so folks can know when it's coming
[1:53:09]
forward by subscribing to snapshot
because again we we want to give people
[1:53:14]
as much when we know that it's coming
forward. We want people to be able to
[1:53:17]
know how would they know when it's
coming forward.
[1:53:20]
Um well, we'll communicate it on our um
project web page and uh we can talk
[1:53:27]
about um maybe teasing out a long range
calendar as part of our agenda process
[1:53:32]
so people can see what items are coming
up.
[1:53:34]
» I think that would be great.
>> Yeah.
[1:53:36]
» Okay. Well, with that um again, thank
you all for being here. We appreciate
[1:53:40]
everything from both the applicants as
well as the public that came and
[1:53:43]
provided their input. Uh this meeting is
adjourned. Good night.