Agenda
We think we found an agenda here: https://sbcounty.granicus.com/AgendaViewer.php?clip_id=5043&embedded=1
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[14:49]
All right, everybody, good
[14:53]
morning. Welcome. Thank you for
[14:54]
joining us for today's JANUARY
[14:56]
15th meeting of the sba board.
[14:57]
For the record, my name is Bob
[15:00]
Olson. I am the chair of sb
[15:01]
2026. MADAM Clerk, please
[15:03]
facilitate the roll call.
[15:05]
Director Rouse here. Director.
[15:08]
Perotti here. Director. Patino
[15:12]
here. Director. Mosby here.
[15:14]
Director. Lee here. Director.
[15:17]
Lavagnino. Director. Julian.
[15:19]
Here. Director. Hartman here.
[15:21]
Director. Clerk. Director.
[15:24]
Capps here. Director. Brown
[15:26]
here. Vice chair. Silva and
[15:29]
chair Nelson here for you all.
[15:31]
Please stand and join me to
[15:33]
pledge allegiance to the flag.
[15:35]
Ready to begin. I pledge
[15:37]
allegiance to the flag of the
[15:39]
United States of America. And
[15:41]
to the Republic for which it
[15:44]
stands. One nation under GOD,
[15:46]
indivisible, with liberty and
[15:59]
justice for all. Okay. Right to
[16:00]
public comment. This is a
[16:02]
public comment period for items
[16:04]
not on today's agenda. Speakers
[16:05]
have up to three minutes each
[16:07]
with a total of 15 minutes
[16:08]
allotted for public comment.
[16:09]
MADAM Clerk, do we have any
[16:11]
public comment here today? Yes.
[16:12]
There are two requests to speak
[16:14]
forms and for any members of
[16:15]
the public on the zoom webinar,
[16:17]
if you wish to speak, would you
[16:18]
please use the raise Hand
[16:20]
feature and I will call upon
[16:21]
you. Our first speaker is Scott
[16:26]
Wentz. Cars are sick. Welcome
[16:29]
MR. Wentz. Happy New Year
[16:30]
MISTER Chair. Members of the
[16:31]
board Scott was representing
[16:33]
Kaiser again. Happy New Year to
[16:36]
all of you. I'm here to address
[16:39]
the issue of Caltrans NOVEMBER
[16:42]
comment about 154 and 246 cars
[16:45]
are basic. Really, really
[16:47]
objected to this. That was a
[16:49]
project that was ill advised,
[16:51]
has hurt people, had multiple
[16:53]
damage, just had another
[16:55]
rollover accident. There was an
[16:57]
injection. This is a roundabout
[16:59]
that has to be taken out
[17:00]
because Caltrans played
[17:02]
political games out of
[17:03]
Sacramento. We have to have a
[17:06]
roundabout. We gave Caltrans an
[17:07]
alternative that would have
[17:10]
cost him $650,000. It would
[17:13]
have taken away the visual
[17:14]
issue that was at that
[17:16]
intersection, and it would have
[17:19]
been worked fine. This has to
[17:22]
stop the city of Lompoc and the
[17:25]
city of Solvang using their
[17:28]
sphere of influence, said to
[17:29]
Caltrans. We do not want this
[17:33]
roundabout here. You have more
[17:34]
traffic, more commercial
[17:36]
traffic on this road. Now,
[17:39]
whenever Gaviota gets cut off,
[17:40]
boom. Guess what? They come
[17:43]
over. 154 you have the
[17:45]
expansion of the casino. You
[17:48]
have the expansion of of of
[17:51]
residents in the area. This
[17:53]
cannot continue and wait until
[17:55]
the two reservation starts
[17:58]
doing as Camp Ford. That is
[18:00]
going to really add a lot of
[18:04]
there. It was badly designed.
[18:07]
It's badly run. Caltrans just
[18:08]
admitted in NOVEMBER that they
[18:10]
were going to fix the problem
[18:12]
by doing more striping and
[18:14]
putting lighting on there. You
[18:17]
can't fix bad design. You can't
[18:21]
fix what causes accidents. And
[18:22]
this goes to the same thing
[18:24]
that we have to say about La
[18:25]
Purisima. You know, you already
[18:27]
killed one firefighter over
[18:29]
there under difficult
[18:31]
circumstances, the people of
[18:34]
the valley did not want this.
[18:36]
Let me repeat that again. For
[18:37]
anybody listening, the people
[18:40]
of Valley did not want that
[18:41]
roundabout. That roundabout has
[18:44]
proven to be an absolute
[18:45]
disaster. You need to use your
[18:47]
authority and press on the
[18:48]
state of California to get that
[18:50]
damn thing out of there. And
[18:52]
we'll give you our design,
[18:53]
because Ceqa says if you have
[18:54]
an alternative design that
[18:57]
meets 90% of the issue you have,
[19:00]
the government has to do that.
[19:02]
Guess what? They played the
[19:04]
forefinger discount. That's
[19:06]
what they told cab. And that's
[19:07]
what's causing the accidents in
[19:09]
the valley. Thank you. Thank
[19:12]
you, MR. Wentz. Our next
[19:25]
speaker is Karen Hammerstein.
[19:28]
Hello, County leaders, Karen
[19:30]
Hauenstein from North County. I
[19:32]
am born and raised in Lompoc
[19:35]
and I live there now. I am here
[19:38]
as a matter of public record,
[19:40]
placing you on notice and
[19:45]
informing you in 2023 inside
[19:48]
the Lompoc Police Department,
[19:51]
we had a suspicious death that
[19:54]
has not yet been fully
[19:56]
investigated. There's been an
[19:57]
official complaint made to the
[19:59]
police officer standards and
[20:01]
training. You need to be aware
[20:04]
of that and follow it through
[20:11]
to its completion. Liliana
[20:15]
Cecilia Zuniga. She was an
[20:18]
abused woman who needs to be
[20:22]
remembered by this county more
[20:24]
than any other people who are
[20:25]
just passing through. Karen.
[20:26]
One second. MADAM Clerk, will
[20:27]
you pause public comment for a
[20:30]
moment? Karen, public comment
[20:31]
when it comes to sb, cag needs
[20:33]
to be on issues that are under
[20:36]
our jurisdiction. Public safety
[20:38]
in our county. We're
[20:40]
transportation
[20:41]
multi-jurisdictional agency for
[20:44]
transportation. Okay. So so
[20:45]
let's try to get our comments
[20:46]
to something that's under the
[20:47]
jurisdiction of this
[20:48]
organization. I mean, what you
[20:50]
had would have been perfect. So
[20:51]
that would be okay. I'm just
[20:53]
placing that on record. Yeah.
[20:54]
Okay. Because you guys are the
[20:55]
leaders of our county.
[20:57]
Understood. But I want to focus
[20:58]
general public comment. Okay.
[20:59]
So then the under the
[21:01]
jurisdiction of this body okay.
[21:04]
So the the bridges across the
[21:06]
Santa Ynez River that were
[21:08]
promised to Lompoc to connect
[21:10]
and start public comment again.
[21:12]
Thank you. That would be for
[21:14]
this place. Yes. Okay. Well,
[21:16]
thank you for also letting me
[21:17]
use the public comment to lodge
[21:19]
my complaints and make sure
[21:21]
they're followed up on publicly.
[21:24]
Happy New year. Happy New year.
[21:25]
If there are any other members
[21:27]
of the public on the zoom
[21:28]
webinar who wish to speak,
[21:30]
would you please use the Raise
[21:31]
Hand feature and I will call
[21:34]
upon you. There are no speakers.
[21:35]
All right. Well, that concludes
[21:37]
public comment. That brings us
[21:39]
to our consent calendar. MADAM
[21:40]
Clerk, are there any changes to
[21:42]
the consent calendar? There are
[21:44]
no changes to the consent
[21:45]
calendar. And there are no
[21:46]
announcements for the consent
[21:48]
calendar. All right. Are there
[21:49]
any items on the consent
[21:51]
calendar that members or
[21:52]
directors would like to pull? I
[21:54]
know that supervisor or sorry
[21:56]
Director Hartman has pulled g.
[21:58]
Anything else not seen up here
[21:59]
in Santa Barbara? In Santa
[22:00]
Maria? Are there any items that
[22:03]
you wish to pull? I'd like to
[22:06]
pull a okay, so that would be
[22:08]
the approval of the minutes. So
[22:10]
for Pitino and that's just
[22:12]
that's just to to vote to
[22:14]
abstain from them. That's not a
[22:16]
discussion. Thank you, Director
[22:17]
Pitino. We'll go ahead and make
[22:19]
sure we have a separate vote on
[22:24]
that. MADAM Clerk, is there any
[22:25]
members of the public pulling
[22:27]
any items on the consent
[22:28]
calendar? Are there any members
[22:29]
of the public on the zoom
[22:31]
webinar who wish to speak? If
[22:33]
so, please use the raise Hand
[22:34]
feature and I will call upon
[22:38]
you. There are no requests to
[22:40]
speak. There is one in North
[22:44]
County that is for right in 166.
[22:46]
Which which item is that? That
[22:48]
is later on in the agenda. Okay.
[22:50]
Understand? Thank you. Before I
[22:53]
move to ask for a motion
[22:54]
supervisor Hartman, are you
[22:55]
looking potentially for a
[22:56]
separate vote on g or just want
[22:58]
to pull it to discuss that?
[23:00]
Okay. So let's go ahead and get
[23:02]
a motion at least on the
[23:03]
minutes. So if I can get a
[23:05]
motion on item a, which is the
[23:07]
approval of the minutes, the
[23:10]
last motion to approve okay.
[23:12]
Motion. Motion from Silva, a
[23:14]
second from Perotti. MADAM
[23:16]
Clerk, please do a roll call.
[23:18]
Director. Rousse. Director.
[23:22]
Perotti. Director. Pitino.
[23:26]
Abstain. Director. Mosby. Hi.
[23:29]
Director. Lee. Director.
[23:32]
Lavagnino. Director. Julian. Hi.
[23:35]
Director. Hartman. Director.
[23:38]
Clerk. Director. Capps.
[23:40]
Director. Brown. Vice chair.
[23:46]
Silva and chair. Nelson, I. I
[23:48]
assume the motion passes. All
[23:50]
right, let's go ahead. And
[23:51]
before I make a motion for the
[23:53]
balance, let's go ahead and
[23:54]
read into the record the item
[23:55]
that's been pulled by
[23:57]
supervisor department. If if
[23:58]
it's everything's fine with
[24:00]
that, then we'll just take a
[24:01]
motion for the balance of the
[24:03]
agenda. After that, Santa Ynez
[24:06]
River valley, Santa Ynez Valley
[24:07]
River trail contractor
[24:09]
agreement to approve an
[24:10]
authorized executive director
[24:12]
to execute an agreement with
[24:14]
Psomas similar to the attached
[24:15]
and based upon review and
[24:16]
concurrence by legal counsel
[24:18]
for planning and engineering
[24:20]
work associated with the Santa
[24:21]
Ynez River trail project in an
[24:26]
amount not to exceed of 796 638,
[24:27]
with a period of performance
[24:29]
extending between execution of
[24:31]
the agreement and DECEMBER 31st,
[24:33]
2028. To authorize the
[24:34]
Executive Director to approve
[24:36]
immaterial amendments to the
[24:40]
agreement. All right, Director
[24:42]
Hartman, thank you. So I have
[24:45]
several questions. The first
[24:47]
has to do with timing. I see
[24:49]
that it's this is expected to
[24:52]
be done in two years. And I
[24:54]
just wondered how that fits
[24:59]
with the the atp grant state.
[25:01]
We're trying to get this done
[25:04]
to fit into the cycle for atp.
[25:07]
And I, I think then we got to
[25:09]
wait what, another two years or
[25:14]
just Director Hartman, the atp
[25:16]
cycle and you can correct me if
[25:17]
I'm wrong, is accepting
[25:18]
applications this summer for
[25:20]
the next cycle. And then it's
[25:23]
every two years. So two years
[25:24]
from this coming summer would
[25:26]
be the next cycle, which would
[25:27]
be the one that would be aiming
[25:29]
for for this project. Okay. So
[25:34]
so that fits. And then first of
[25:35]
all, I'm just really excited to
[25:38]
see this. Let me the next
[25:41]
question has to do with the
[25:42]
federal grant and how that
[25:45]
would fit with this contract.
[25:47]
Very good question, Director
[25:50]
Hartman. The federal grant was
[25:53]
awarded to the Chumash Indians
[25:55]
in the amount of $1.4 million,
[25:57]
and it has a required match,
[25:59]
which is this project. The
[26:00]
match is what we're doing now.
[26:01]
So we have been coordinating
[26:03]
with the tribe. The tribe has
[26:04]
been approached by the Federal
[26:06]
Highway Administration, the
[26:08]
grantor, and there's the
[26:12]
current state is we've worked,
[26:14]
Fred Luna and I, to work on the
[26:16]
agreement between the tribe and
[26:20]
FHWa. That goes back to FHWa.
[26:22]
And once it's agreed upon, then
[26:24]
the funds that agreement will
[26:26]
run up the chain at FHWa for
[26:27]
execution on their side. And
[26:29]
assuming it does become
[26:30]
executed, I think there's no
[26:32]
guarantee but that right now it
[26:36]
looks likely. Then in all
[26:39]
likelihood, sba will take on
[26:40]
the work for that, just as we
[26:43]
did, because part of today's
[26:44]
action is to approve an
[26:45]
agreement with the contractor.
[26:47]
But part of the funding behind
[26:48]
that was awarded to the tribe,
[26:50]
and it was probably about four
[26:51]
months ago. We came and had an
[26:53]
agreement between sb tribe for
[26:54]
sb, kg to take on management of
[26:56]
that grant, and that's what we
[26:57]
expect to happen for this one
[26:59]
as well. So when we advertise
[27:01]
the work, there are a variety
[27:04]
of optional tasks included in
[27:05]
the agreement, which are the
[27:08]
ones that would be filled in
[27:11]
with the federal grant. So does
[27:13]
it seem like this contractor
[27:15]
would take it on or. We're not
[27:17]
sure yet? That's a good
[27:18]
question. Supervisor Hartman or
[27:21]
Director Hartman, assuming we
[27:22]
can negotiate in good faith
[27:23]
with the contractor and come to
[27:26]
an agreement on price. So it's
[27:28]
part of today's agreement, says
[27:30]
that the contractor would have
[27:33]
to honor the same hourly rates
[27:35]
that they're doing for the work
[27:36]
that hopefully gets approved
[27:38]
today. So if we can come to an
[27:40]
agreement, we can amend it into
[27:41]
the contract. Otherwise we'd go
[27:43]
back out to bid for those
[27:48]
optional tasks. So so we MAY
[27:50]
just fold it in and not have to
[27:52]
go out again through the
[27:56]
process. If, if they can, if
[27:59]
and once again if there's a
[28:00]
there's a lot of moving pieces
[28:02]
with this. One of them is that
[28:04]
that grant award is federal.
[28:05]
And all the other money that
[28:07]
we've had to this point is
[28:08]
either state or local, and
[28:09]
there's different contracting
[28:10]
requirements. So we would have
[28:14]
to ensure that the ph is
[28:16]
allowing us to to go this route.
[28:18]
Otherwise we'd have to go out
[28:20]
to bid to. I see okay. Thank
[28:23]
you. And my final question, as
[28:25]
I look to the environmental
[28:28]
piece and the contract, it
[28:30]
doesn't make any mention of the
[28:33]
recreation master plan eir,
[28:35]
which was designed to be
[28:37]
programmatic and to tear off.
[28:40]
So how will that work? Another
[28:42]
great question, Director
[28:43]
Hartman, for the environmental.
[28:45]
So the agreement that's being
[28:46]
approved today is a work
[28:48]
package. One is 100% of the
[28:49]
environmental work within the
[28:51]
city of Buellton. So at the
[28:53]
conclusion of this project, the
[28:54]
trail will be construction
[28:56]
ready for city of Buellton.
[28:57]
Outside of the city, the
[28:59]
environmental work is an
[29:02]
optional task, and we are also
[29:03]
we're paying attention to the
[29:04]
county's process of the
[29:06]
recreation Master plan. And
[29:08]
when that is approved, then we
[29:10]
could tear off of it. We can't
[29:11]
tear off of in anticipation of
[29:13]
it being approved. But that is
[29:15]
certainly something that we are
[29:17]
keeping our eyes on as this
[29:19]
goes forward. It's coming soon.
[29:21]
Thank you. And thank you for.
[29:25]
And then the person for sb, k
[29:29]
who is the contact for this for
[29:32]
this work isn't your friend. Is
[29:35]
that typical? No, it's Tom Vo
[29:37]
who's sitting right back here.
[29:39]
Tom works in planning Division
[29:40]
under me. Okay, I'll be
[29:42]
involved. Fred will be involved
[29:43]
because this is a mix of
[29:45]
planning and engineering. It's,
[29:47]
you know, perhaps I can't be a
[29:49]
good advisor on engineering
[29:50]
aspect. And Fred can't be a
[29:52]
good advisor on the planning
[29:53]
aspect. So it's a team. And
[29:55]
Tom's going to keep us
[29:56]
organized and pointing in the
[29:58]
right direction. Okay. Well,
[30:01]
again, I'm I'm absolutely
[30:02]
delighted to see this. Thank
[30:05]
you. All right. Thank you,
[30:06]
Director Patino, any other
[30:08]
questions from board members?
[30:10]
Public comment item item g, are
[30:12]
there any members of the public
[30:13]
on the zoom webinar who wish to
[30:15]
speak on item g? Please use the
[30:17]
raise hand feature and I will
[30:18]
call upon you. There are no
[30:20]
paper requests to speak forms
[30:21]
and there are no attendees who
[30:24]
wish to speak. Okay, supervisor
[30:25]
Director Hartman, no reason for
[30:27]
a different vote on that. So
[30:29]
with that, I could get a motion
[30:30]
for the balance of the agenda,
[30:32]
which would be items four b
[30:36]
through four. I moved by Brown.
[30:38]
I need a second, second, second
[30:40]
from Hartman. Can we please do
[30:41]
a roll call? Vote. Director.
[30:44]
Rouse. Director. Perotti.
[30:48]
Director. Patino. I director.
[30:51]
Mosby. Hey, director. Lee. Hi.
[30:53]
Director. Lavagnino. Director.
[30:57]
Julian. Hi. Director. Hartman,
[31:00]
I director. Clark. Director.
[31:02]
Capps. Director. Brown. Vice
[31:05]
chair. Silva and chair. Nelson.
[31:08]
Hi. Motion passes. All right.
[31:15]
Thank you. We'll go ahead and
[31:16]
move on to the discussion items.
[31:18]
Item five a MADAM Clerk, will
[31:19]
you please read that item to
[31:21]
the record? Item five a sb 2026
[31:23]
Committee appointments
[31:24]
recommended actions one.
[31:25]
Appoint one delegate an
[31:26]
alternate to the California
[31:27]
Association of Councils of
[31:29]
Governments to appoint one
[31:30]
delegate and an alternate to
[31:33]
the Los Angeles, San Diego, San
[31:34]
Luis Obispo Rail Corridor.
[31:35]
Agency three appoint one
[31:36]
delegate and alternate to the
[31:39]
Coast Rail Coordinating Council.
[31:41]
For appoint one member and one
[31:42]
alternate to the Board of
[31:44]
Directors. Five appoint members
[31:46]
to the highway 154 Safety
[31:47]
Committee six appoint members
[31:49]
to the Executive Committee
[31:51]
chair, vice chair, immediate
[31:53]
past chair and chairs of North
[31:55]
County and South Coast Regional
[31:57]
seven. Appoint an sb, k board
[31:59]
delegate to participate in the
[32:01]
Central Coast Coalition.
[32:03]
Sacramento Legislative Advocacy
[32:04]
Day scheduled for MARCH 17th
[32:07]
and 18th, 2026. Eight appoint
[32:09]
the sb, k chair, Vice Chair and
[32:10]
immediate past chair to serve
[32:12]
as the Washington, dc
[32:13]
legislative delegation
[32:14]
representing sb kegs interest
[32:16]
in Washington, dc the week of
[32:20]
MARCH 23rd, 2026. All right.
[32:22]
Thank you. So let's go.
[32:25]
Director Kern, Liana went
[32:26]
through the list of
[32:27]
appointments. This is your
[32:29]
annual chance to appoint your
[32:31]
yourself or others to
[32:33]
committees that meet throughout
[32:35]
the year. I'd be happy to
[32:39]
answer any questions about
[32:40]
about the appointments or the
[32:42]
committees, if you have any.
[32:43]
But otherwise, normally we just
[32:45]
go through the committees and
[32:46]
ask for volunteers. Okay, great.
[32:48]
Thank you. Thank you, Director
[32:50]
Kern. And typically, you know,
[32:52]
a lot of these committees,
[32:54]
there's a bit of value in
[32:55]
having some background in it.
[32:57]
So those that are already in it
[32:58]
are often, you know, favored by
[33:00]
the board because they've got
[33:01]
some that experience there.
[33:02]
Although this is also the time
[33:04]
for somebody that says, hey,
[33:05]
that's something I would be
[33:06]
interested in in the future. So
[33:08]
it's also good for us to know
[33:10]
that this is our opportunity to
[33:11]
have those conversations. We'll
[33:12]
go ahead and start off with Cal
[33:14]
Cog. I'm the regular member and
[33:15]
director. Patino is the
[33:18]
alternate there this year. I
[33:20]
have quite a bit of work on my
[33:21]
on my calendar already on
[33:23]
chairing this and other things
[33:25]
throughout. I've talked to
[33:26]
Director Silva about
[33:27]
potentially being the regular
[33:28]
member, and I think he's
[33:29]
interested in that. I don't
[33:31]
know if Director Patino would
[33:32]
like to stay on as alternate
[33:34]
for that. I'm happy to move to
[33:35]
alternate position if she
[33:36]
doesn't want that, but I'd be
[33:38]
happy to let her stay there as
[33:39]
well. Director Nelson, I would
[33:41]
I would like to be the member
[33:43]
on that because I've been the
[33:46]
alternate. Okay, so. And maybe
[33:48]
Director Silva would take the
[33:51]
alternate. That works for me.
[33:55]
That sounds great. So any other
[33:56]
not seeing anybody jump up and
[33:58]
down here. Thank you, Director
[34:00]
Patino for jumping up on that
[34:01]
down in Santa Maria. And again,
[34:04]
if any of these items that
[34:05]
you're interested in Santa
[34:06]
Maria, please don't hesitate to
[34:08]
to to speak up. The next item
[34:11]
here is Lausanne. I believe we
[34:15]
got here. And currently we have,
[34:18]
I believe, director and
[34:19]
Director Lee as the regular
[34:21]
alternate members. Are you both?
[34:23]
I'd like to stay on Lausanne.
[34:25]
I'm happy as alternate. Okay.
[34:27]
Great. Seeing no objection,
[34:28]
we'll keep moving on to the
[34:30]
Crcc, which is the Coast Rail
[34:31]
Coordinating Council. Currently
[34:33]
we have Director Rousse. And as
[34:35]
the regular member and director
[34:37]
Brown as the alternate. I'm
[34:38]
fine with the status quo. Okay,
[34:40]
we got some thumbs up up here.
[34:42]
Everybody good down there?
[34:44]
Looks like it. Moving on to the
[34:46]
California Vanpool Authority
[34:47]
Caravans. Currently I'm a
[34:50]
regular appointed member and
[34:51]
director Julian is the
[34:52]
alternate. It's a preference
[34:55]
for me to stay on that. I am on
[34:56]
the executive committee. I have
[34:57]
stepped away from being the
[34:59]
vice chair, which I had been
[35:00]
for the last couple of years,
[35:01]
but we're going through some
[35:02]
major changes of management,
[35:04]
happy to pass it on in the next
[35:06]
year or two if somebody is
[35:07]
interested, but I think I need
[35:09]
to be on that for the purposes
[35:10]
of the continuity, with no
[35:11]
objections. And Director Julian,
[35:13]
are you okay staying on as the
[35:15]
alternate? I am, sir. Thank you,
[35:16]
thank you. Moving along to the
[35:17]
State Highway 154 Safety
[35:20]
Committee, I think we have five
[35:23]
directors on that at this point.
[35:26]
Is that correct? That correct?
[35:27]
Just for the record, that's
[35:28]
that is Director Hartman,
[35:31]
director Capps, director Prodi,
[35:32]
director Silva and director
[35:33]
Brown. So that's the kind of
[35:35]
those areas, the second and
[35:36]
third district of the
[35:37]
supervisors and the three
[35:38]
cities that are kind of
[35:41]
impacted there as well. Are you
[35:42]
guys all happy staying on that?
[35:44]
Okay. So the direction of the
[35:45]
board currently is to and the
[35:47]
motion will make is to keep
[35:48]
that the same status quo. The
[35:51]
sb, cag Executive Committee,
[35:53]
which is traditionally the
[35:56]
chair and the vice chair and
[35:57]
chair, vice chair, former past
[35:59]
chair and the chairs of the
[36:00]
subregional. So five five
[36:02]
members. Okay. Any objections
[36:05]
there. Yeah. Do we have the the
[36:07]
Subregionals already voted on.
[36:08]
Yes. Who are the chairs of the
[36:10]
director Julian and Director
[36:16]
Lee okay. Past chair is Rouse.
[36:18]
Yeah. So be Rouse Nelson, Silva
[36:19]
Julian and Lee for the
[36:21]
executive committee. All right.
[36:23]
Since Central Coast coalition
[36:25]
state legislation, legislative
[36:30]
advocacy day. Who wants to go
[36:33]
to Sacramento. So how many how
[36:34]
many numbers do we we send to
[36:36]
this. We normally take one. At
[36:41]
least one okay. I will be I
[36:42]
think unavailable at that time.
[36:45]
So I'm not able to do that or
[36:46]
else I would volunteer. But is
[36:47]
there anybody that's interested
[36:52]
in potentially going to state?
[36:57]
State Legislative Advocacy Day,
[37:00]
MARCH? I might be unavailable
[37:04]
as well. Okay. Can we, per the
[37:07]
motion, make that a CHAIRMAN's?
[37:09]
Can I appoint somebody at a
[37:10]
later date? If you guys would
[37:12]
make that part of the motion is
[37:14]
I will appoint somebody to go
[37:15]
to that. And once you guys
[37:17]
check your schedules, you guys
[37:18]
let me know and I'll find
[37:20]
somebody. And we can take more
[37:21]
than one if necessary. If more
[37:22]
than one is interested. Okay.
[37:23]
Thank you, Director Kern.
[37:25]
Moving on to the Washington, dc
[37:25]
legislative delegation.
[37:27]
Typically, again, this is the
[37:28]
former past chair, the current
[37:29]
chair and the vice chair, which
[37:30]
would traditionally be Rouse,
[37:32]
Nelson and Silva. Everybody's
[37:37]
good with that. Okay. MADAM
[37:40]
Clerk, did you catch all that?
[37:44]
Okay. Any discussions from
[37:45]
anybody else that would like to
[37:47]
you know, this is kind of speak
[37:49]
now or forever hold your peace
[37:50]
in Santa Maria. Any other
[37:52]
thoughts? None up here. All
[37:54]
right. Thank you, Director
[37:55]
Patino. MADAM Clerk, is there
[37:57]
any public comment? If there
[37:59]
are any members of the public
[38:00]
on the zoom webinar who wish to
[38:02]
speak, would you please use the
[38:03]
raise hand feature and I will
[38:05]
call upon you. There are no
[38:07]
paper requests to speak forms,
[38:09]
and there are no attendees who
[38:10]
wish to speak. Okay. MADAM
[38:13]
Clerk, is it clear from the
[38:16]
discussion up here if somebody
[38:20]
says a motion to appoint the
[38:21]
committees as discussed by the
[38:23]
board, that that. Yes. Good
[38:25]
enough for you on the motion,
[38:26]
or do we need to rephrase the
[38:27]
appointees and delegates the
[38:30]
record. Okay, okay. We're good.
[38:32]
Okay. So I'm looking for a
[38:34]
motion of a slate of appointees
[38:35]
based on the discussion we had
[38:38]
up here just now, I got a move
[38:40]
to approve. Okay. Motion from
[38:41]
Brown, second, second from
[38:44]
Silva. All right. Can we go
[38:46]
ahead and do a roll call? Vote,
[38:47]
please. Director. Rouse.
[38:48]
Director. Perrotti. Hi.
[38:51]
Director. Patino. Hi. Director.
[38:55]
Mosby. Director. Lee. Director.
[38:59]
Lavagnino. Director. Julian. Hi,
[39:01]
director. Hartman, I. Director.
[39:03]
Clark. Director. Capps.
[39:05]
Director. Brown. Vice chair.
[39:08]
Silva and chair. Nelson I.
[39:10]
Motion passes. All right, just
[39:12]
for a moment of agenda.
[39:13]
Management is our is our
[39:15]
presenter for five here. Okay.
[39:16]
So we're gonna go ahead and
[39:18]
move on to item five b. MADAM
[39:19]
Clerk, would you please read
[39:21]
that item into the record?
[39:22]
Final state 166 comprehensive
[39:23]
corridor study recommended
[39:25]
actions one. Approve the final
[39:27]
State Route 166 comprehensive
[39:29]
quarter study and two direct
[39:30]
staff to file a notice of
[39:31]
exemption with the Santa
[39:33]
Barbara County Clerk pursuant
[39:36]
to section 15738b2 of the
[39:37]
California Environmental
[39:42]
Quality Act, Ceqa guidelines.
[39:43]
All right. I guess staff will
[39:44]
have a presentation for us.
[39:46]
Thank you. Good morning, chair
[39:48]
and directors and happy New
[39:51]
year. I'm Michael Carney from
[39:54]
sp, cag programing. And today
[39:58]
we will be presenting the final.
[40:01]
There you go. 166 Corridor
[40:06]
Study. I will be using this I
[40:12]
think. Okay. Sb cag has been
[40:14]
working with Caltrans, City of
[40:17]
Santa Maria, City of Guadalupe
[40:19]
and the county to develop this
[40:23]
study with our consultant dcs
[40:29]
and Somas. As a reminder, the
[40:32]
study focuses on State Route
[40:34]
166 between City of Guadalupe
[40:37]
and City of Santa Maria, as
[40:41]
well as the parallel facilities.
[40:42]
Excuse me, Chair Nelson, could
[40:44]
you ever speak up a little bit,
[40:47]
please? Yes, yes. Is this okay
[40:51]
if I bring it closer to me?
[40:55]
Perfect. There is a little
[40:57]
button on your right to raise
[40:59]
the platform. Oh, this actual
[41:03]
platform. Got it. Okay, let's
[41:05]
do it. Okay. Does this help?
[41:07]
Yeah. Do a test. All right. I
[41:09]
just have to project. So I'll
[41:10]
just go over this part real
[41:12]
quick. As a reminder, the the
[41:15]
study focuses on State Route
[41:17]
166 from Guadalupe to Santa
[41:18]
Maria. And it includes the
[41:23]
parallel facilities as well.
[41:26]
Nope. Okay. The goal of this
[41:29]
study is to develop a list of
[41:32]
improvements to address the
[41:34]
issues along the corridor.
[41:36]
Examples of those issues
[41:39]
include safety, congestion,
[41:42]
goods movement, and multimodal
[41:44]
connections. The study also
[41:48]
helps us prepare for future
[41:50]
funding and sets us up for
[41:52]
future grants, competitive
[41:54]
grants, and it also helps us
[41:56]
identify any projects that we
[41:58]
MAY want to include in our
[42:03]
measure a renewal. So I'm going
[42:05]
to pass it off to Jim Danko
[42:07]
from dcs, who is helping us
[42:15]
with the study. Oh, that's for
[42:24]
you. Okay. MR. Chair, members
[42:26]
of the board again, Jim, I'm a
[42:28]
principal at dcs associates. We
[42:30]
are also joined by Thomas
[42:31]
Engineering for civil support
[42:33]
to help support sb, cag in this
[42:36]
study. I'll quickly go through
[42:37]
the aspects of the study, the
[42:39]
existing conditions analysis,
[42:41]
our community engagement
[42:43]
efforts, the performance
[42:44]
assessment, and then quickly go
[42:46]
through the the cip
[42:47]
improvements that some of you
[42:50]
have already seen and wrap up
[42:54]
with implementation. So for
[42:56]
existing conditions, we took a
[42:58]
pretty deep dive. We looked at
[43:00]
the socioeconomic
[43:01]
characteristics of the area. So
[43:03]
city of Guadalupe, Santa Maria,
[43:04]
Orchard area, but also the
[43:05]
socioeconomic characteristics
[43:08]
of the users that are on 166 on
[43:10]
a daily basis. We did that
[43:13]
through cell data, big data. We
[43:14]
looked at goods movement, we
[43:17]
looked at operations. And in
[43:19]
terms of delay and travel time
[43:21]
reliability, which is kind of a
[43:22]
new metric that is of key
[43:24]
interest. Obviously, we looked
[43:26]
at safety, looking at the
[43:28]
collision history and where the
[43:30]
hotspots tend to be. And we as
[43:32]
part of that, we also performed
[43:34]
a roadway or road safety audit,
[43:36]
which is a method prescribed by
[43:38]
Federal Highway Administration,
[43:39]
which actually took our team
[43:41]
out there and walked the
[43:42]
corridor, took lots of
[43:43]
observations, and that included
[43:45]
staff from Guadalupe, Santa
[43:48]
Maria, Caltrans, sb, cag, and
[43:50]
the consultant team. We looked
[43:52]
at multimodal access in terms
[43:55]
of ped, bike and transit, and
[43:57]
then looked at how stressful it
[43:59]
is for those active
[44:00]
transportation users within the
[44:02]
corridor. As you might imagine,
[44:03]
it's very stressful, which
[44:05]
keeps people from wanting to
[44:07]
bike or walk the corridor. And
[44:08]
then finally we looked at we
[44:11]
used a series of Caltrans
[44:14]
website tools to look at equity
[44:16]
and vulnerable network as it
[44:18]
relates to extreme weather
[44:21]
events. So in terms of our
[44:23]
community engagement, we used
[44:26]
all our our resources to make
[44:28]
sure we did a good job of this.
[44:30]
We had a project website. We
[44:31]
had an interactive web based
[44:33]
tool that allowed folks in the
[44:34]
comfort of their own home to
[44:37]
provide public input. We did a
[44:39]
community survey, both online
[44:43]
and in person, and a lot of
[44:45]
collateral materials to make
[44:46]
sure folks were aware of that
[44:49]
the study was going on. We also
[44:52]
did about five pop ups where we
[44:53]
don't ask people to come to us,
[44:56]
we go to where they are. I'm
[44:57]
happy to say we exceeded our
[44:59]
goals in terms of the number of
[45:01]
community surveys that were
[45:04]
performed by the public. We
[45:07]
also the lion's share over 70%
[45:10]
were done by Hispanic speakers.
[45:12]
And we also shout out to the
[45:14]
county who allowed us to use
[45:16]
Promotoras, which are folks who
[45:18]
speak Mexican, who that
[45:19]
community does not have a
[45:21]
written language. So the only
[45:22]
way you can get their input is
[45:24]
verbally. That was a really
[45:26]
nice resource, and we did very
[45:28]
well with our community
[45:29]
engagement and exceeded our our
[45:30]
community engagement goals. I
[45:32]
think we got close to 500
[45:34]
surveys filled out. And then in
[45:36]
addition to that, we did go and
[45:37]
hold two public workshops, one
[45:39]
in Guadalupe, one in Santa
[45:40]
Maria, where we asked folks to
[45:42]
come and provide input on the
[45:44]
improvement concepts that were
[45:45]
under consideration. And then
[45:47]
last but not least, we had
[45:49]
meetings with our stakeholder
[45:52]
advisory committee, with the
[45:53]
subregional planning committee
[45:59]
of sb, cag, as well as tac.
[46:00]
Okay. The performance
[46:01]
assessment. We did look at
[46:06]
roughly 11 types of
[46:07]
improvements in the world we
[46:09]
live in in terms of federal
[46:10]
grants. It's all performance
[46:12]
based. So that's we're looking
[46:14]
at not only the costs of the
[46:15]
improvements, but also the
[46:16]
monetized benefits of the
[46:18]
improvements. And from that you
[46:19]
can get a benefit cost
[46:20]
assessment. It's not the only
[46:22]
metric, but it's a key metric
[46:23]
that drives a lot of funding
[46:24]
decisions made by the
[46:26]
California Transportation
[46:28]
Commission and federal highways.
[46:30]
So we looked at the benefits as
[46:31]
it relates to collision
[46:33]
reduction, delay reduction,
[46:35]
travel time, reliability
[46:38]
improvement, fuel use on road,
[46:40]
mobile source emissions, so on
[46:43]
and so forth. So we didn't we
[46:45]
tried not to leave any rock
[46:46]
unturned in terms of monetizing
[46:48]
benefits. We didn't want to
[46:49]
leave any on the ground or, you
[46:52]
know, off the table. But there
[46:53]
are some you can't capture all
[46:55]
in one that the growers are
[46:56]
Shippers Association pointed
[46:59]
out that we could not be on the
[47:01]
scope of our study, but we do
[47:03]
recognize it is the cost of
[47:05]
agriculture for transporting
[47:07]
perishable goods every hour
[47:10]
between cut and in the in the
[47:11]
Coolidge storage is a day of
[47:13]
shelf life that's lost. And
[47:14]
that has economic implications,
[47:16]
of course. So we we do talk
[47:18]
about it, but we didn't
[47:20]
monetize that, which basically
[47:21]
means that our, our benefit
[47:24]
cost ratio, which was very good
[47:26]
2.66 is probably underestimated.
[47:28]
We didn't take that into
[47:30]
account. But again freight
[47:33]
movement is improved. Gross
[47:35]
regional product in the region
[47:38]
adds about $12 million. If the
[47:39]
construction of these
[47:41]
improvements takes place, and
[47:42]
then that will create jobs as
[47:44]
well. So a lot of economic
[47:46]
benefit and then, you know,
[47:47]
benefit cost is not the only
[47:49]
thing. So we did look at policy
[47:51]
consistency. Not only the local
[47:53]
agency general plan policies.
[47:54]
That's the city of Guadalupe
[47:56]
and the city of Santa Maria and
[47:58]
the county. And as well as the
[47:59]
regional policies of sb, cag
[48:02]
and their rtp, but also
[48:04]
Caltrans. Of course, it's their
[48:05]
facility. And so we looked at
[48:07]
their climate change
[48:08]
initiatives and their policies
[48:10]
to see how congruent each of
[48:12]
the projects were. And that's
[48:17]
what this matrix shows. And in
[48:19]
terms of we did have a public
[48:20]
draft. It was released in
[48:21]
OCTOBER. We did receive
[48:23]
comments from Caltrans, sb, cag,
[48:25]
the North County Subregional
[48:27]
Planning Committee, as well as
[48:28]
the stakeholder advisory
[48:30]
committee. And just real quick,
[48:31]
I'll just summarize those
[48:34]
comments for you. So for sb and
[48:37]
Caltrans, the typical editorial
[48:39]
suggestions but in better
[48:40]
resolution list of acronyms,
[48:42]
which is now part of the draft.
[48:44]
And then some clarifications on
[48:46]
the performance assessment for
[48:47]
Caltrans, the North County Sub
[48:50]
Regional Committee, they desire
[48:52]
to see a four lane widening 166
[48:54]
as part of a aspirational list
[48:56]
of projects that are longer
[48:58]
term. This. The planning
[48:58]
horizon for this study is
[49:01]
roughly 20 to 25 years. So
[49:03]
short term, if you will, when
[49:04]
it comes to transportation
[49:06]
improvements. But the longer
[49:08]
term are equally as important
[49:10]
because, of course, measure a
[49:13]
will sunset in 2040. And if
[49:14]
there's a renewal effort,
[49:15]
there's a desire to have new
[49:16]
regional improvements that can
[49:19]
be made part of that referendum.
[49:21]
They also suggested that the
[49:23]
Bonita School Road or Bonita
[49:25]
School itself should be
[49:28]
relocated. We agreed with that
[49:30]
as well as the stakeholder.
[49:31]
Well, the stakeholder advisory
[49:32]
committee strongly agreed with
[49:34]
that as well. So that was an
[49:37]
interesting input. And then
[49:39]
just one good question was, was
[49:40]
there any regional differences
[49:42]
in the public input? In other
[49:44]
words, do residents of City of
[49:45]
Guadalupe have different
[49:47]
opinions of what they'd like to
[49:48]
see in terms of improvements
[49:51]
and other aspects versus Santa
[49:52]
Maria and orchid? So we did go
[49:54]
back and take a look at that.
[49:56]
For the most part, they were
[49:57]
very congruent, but there was
[49:59]
some differences. City of Santa
[50:02]
Maria Orcutt were more pro for
[50:03]
more enforcement in the
[50:07]
corridor. They were also more
[50:08]
advocating active
[50:09]
transportation improvements
[50:11]
versus the Guadalupe side,
[50:13]
which they advocated more
[50:16]
transit, which was interesting.
[50:19]
And people in Guadalupe use 166
[50:20]
a lot more than folks in Santa
[50:23]
Maria. So that was a pretty
[50:25]
clear from the separating those
[50:27]
two. So that's now documented
[50:29]
in the report. And then the
[50:30]
advisory committee, I've
[50:31]
already mentioned some of this.
[50:33]
They wanted to see more
[50:34]
operational improvements in
[50:35]
lighting on bed Arabian Black
[50:38]
Road as well as Black and Stole,
[50:41]
which we incorporated also
[50:43]
again, Bonita School location
[50:45]
is problematic. And the reason
[50:46]
that is, is that it's in the
[50:48]
middle of the ag fields, and
[50:50]
there's a lot of windblown
[50:51]
particulates. Those
[50:52]
particulates typically have
[50:54]
pesticides, herbicides, and you
[50:55]
have a sensitive receptive
[50:57]
group with young children right
[50:58]
in the middle of all that. So
[51:00]
all the students come from
[51:01]
Santa Maria. That's where
[51:04]
they're they live. So it makes
[51:06]
sense to possibly examine
[51:10]
relocation of that school. And
[51:11]
then again, recognition that
[51:12]
the benefit cost does not
[51:17]
reflect perishable goods. And
[51:19]
so this is a a matrix of how
[51:21]
our stakeholder advisory
[51:23]
committee scored each of the
[51:24]
improvements. And I'll walk
[51:25]
through those pretty well. But
[51:27]
for the most part there was a
[51:29]
lot of support. They had the
[51:32]
option of showing support,
[51:33]
being neutral or indifferent to
[51:37]
the improvement, or did not
[51:39]
support and then support with
[51:41]
the condition. And as you can
[51:42]
see, there was only two
[51:43]
improvements that they could
[51:45]
not support or a few of them
[51:47]
did not support. It was 5050.
[51:49]
And that was the roundabout
[51:50]
alternatives to some of the
[51:52]
improvements. They preferred
[51:53]
signalized intersections. And
[51:55]
that's fine. We provide both
[51:57]
options. And then the Santa
[52:00]
Maria River levee Trail, about
[52:02]
half the group were not very
[52:03]
supportive of that improvement
[52:05]
being included as part of the
[52:09]
package. And then for the long
[52:12]
term improvement, a couple as a
[52:13]
condition of support, wanted to
[52:16]
see the class one trail
[52:17]
decoupled from the four lane
[52:19]
widening. We included them as a
[52:22]
couplet, so that would be a
[52:25]
class one trail from connecting
[52:27]
Santa Maria to Guadalupe
[52:28]
bidirectional, and that would
[52:30]
be on the south side of the
[52:32]
facility. And then the widening
[52:35]
of 166, which is very costly in
[52:36]
the subregional planning
[52:37]
committee, asked for a cost of
[52:40]
that based on construction year
[52:44]
of 2040. It's about $320
[52:50]
million. So not cheap. So real
[52:52]
quick, the improvement concepts.
[52:55]
This is an overall map. We do
[52:59]
reflect the purple bubbles that
[53:02]
that's the existing Gaps cap m
[53:04]
project that is currently
[53:06]
moving forward with planned
[53:09]
completion by 20 2829. That
[53:11]
includes a signalized
[53:14]
intersections in Guadalupe, as
[53:17]
well as some bike facility
[53:18]
improvements within the city of
[53:20]
Santa Maria. The green bubbles
[53:22]
are those that were identified
[53:24]
as part of this study, and I'll
[53:26]
walk through those very quickly.
[53:31]
So that's a rendition of the
[53:34]
Gaps cap m project, which we
[53:36]
did not reflect in the benefit
[53:37]
cost, but we wanted to include
[53:39]
because we're leveraging those
[53:40]
improvements as part of this
[53:43]
study. But as far as hours. So
[53:47]
a signalization of the Cmis 166
[53:49]
intersection, which additional
[53:51]
channelization for operational
[53:56]
and safety improvements. Some
[53:58]
formalizing of the access to
[54:00]
Bonita School Road from 166,
[54:01]
again for safety and
[54:03]
operational benefits, as well
[54:05]
as formalizing the parking and
[54:08]
some ingress egress
[54:09]
characteristics going into the
[54:14]
school itself. Ray Road in
[54:18]
mainline. This is basically
[54:19]
formalizing that stop
[54:23]
controlled at the northbound to
[54:24]
provide an extended right and
[54:26]
left turn storage, because
[54:28]
right now cuz pretty
[54:29]
significantly causing a lot of
[54:31]
delay. And that's also a safety
[54:32]
improvement for improved sight
[54:33]
distance for those turning left
[54:38]
and right. Okay. This is for
[54:40]
Hansen. And this is extending
[54:41]
this is only in the westbound
[54:42]
direction right now. The lane
[54:44]
drop occurs roughly around
[54:46]
Hansen. And but there's a lot
[54:48]
of businesses on the on that
[54:50]
north side with driveways. That
[54:52]
causes a lot of friction
[54:55]
turning movements that are are
[54:57]
creating safety issues. So the
[54:59]
idea here is that we extend
[55:02]
that lane drop beyond Hansen
[55:03]
and beyond where those
[55:05]
driveways are. So it's a much
[55:07]
smoother transition from 2 to 1
[55:11]
lane. And then we also
[55:13]
identified pave way or paved
[55:17]
driveway aprons. And this is a
[55:18]
safety because it adds traction
[55:20]
to ingress and egress vehicles
[55:22]
coming out of those driveways
[55:24]
and those fields. But also it
[55:27]
cuts down on dust and marine
[55:28]
train road dust. So dust
[55:29]
abatement strategy. And this
[55:31]
was very popular among the
[55:35]
stakeholder advisory group. And
[55:37]
also the need for lighting. So
[55:38]
we heard this loud and clear
[55:40]
from the public and is an issue
[55:42]
particularly around key
[55:43]
intersections. So we identified
[55:47]
additional lighting for various
[55:48]
key locations within the
[55:51]
quarter. And also on Betteravia
[55:55]
Road. We also are advocating
[55:57]
the purchase of 15 additional
[56:00]
vans from Cal Van to provide
[56:01]
exclusive service for ag
[56:04]
workers. We work closely with
[56:06]
Cal Vans to identify what the
[56:08]
potential demand was for these
[56:11]
added vehicles, and there is a
[56:12]
demand there. Calvin's is
[56:14]
already doing a lot of work in
[56:15]
this corridor, but they
[56:16]
recognize that it's not enough
[56:19]
and they can do more. So we're
[56:21]
advocating additional 15 cal
[56:23]
vans and then also for Santa
[56:25]
Maria Regional Transit, which
[56:26]
has now assumed control of the
[56:28]
Guadalupe Flier service between
[56:29]
Guadalupe and Santa Maria to
[56:32]
reduce those headways from 60
[56:33]
minutes to 30 minutes. That's
[56:35]
going to require a purchase of
[56:38]
an additional 35 foot bus. And
[56:40]
so transit service would be
[56:43]
much more, I think, convenient,
[56:44]
particularly for those
[56:46]
residents in Guadalupe who rely
[56:49]
on transit to go to Santa Maria
[56:52]
and back. Okay, so this is the
[56:53]
Surface Transportation
[56:55]
Assistance Act Star. This is
[56:58]
for truck circulation. And I
[57:00]
just want to make it clear from
[57:01]
the beginning the trucks are
[57:04]
already out there. So so any of
[57:05]
these improvements are not
[57:07]
allowing trucks where they
[57:09]
currently aren't operating.
[57:11]
That that is a misconception.
[57:12]
It's just trying to formalize
[57:14]
the network for not only the
[57:16]
truckers, but also for chp who
[57:19]
must enforce the regulations
[57:22]
and and also for the city of
[57:25]
Santa Maria, who's trying to
[57:27]
preclude the number of heavy
[57:29]
duty trucks, five axle plus
[57:30]
trucks that have to traverse
[57:33]
through their downtown on 166.
[57:35]
So and and we did find that not
[57:37]
only are the trucks there, but
[57:39]
they're growing in numbers and
[57:41]
they're growing faster than the
[57:43]
traffic overall is growing. So
[57:45]
the mix of heavy duty trucks is
[57:48]
increasing in this region. So
[57:52]
we've identified stay signage
[57:53]
improvements as well as some
[57:55]
other safety improvements. But
[57:56]
to formalize the network so
[57:58]
truckers know where to go and
[58:00]
where they should be. And we
[58:01]
identified a number of
[58:03]
alternative networks. There's
[58:05]
roughly six that are shown in
[58:07]
the report. I would say that
[58:09]
the city of Santa Maria is
[58:12]
advocating just bringing the
[58:14]
star signage, allowing trucks
[58:18]
to be on 166 up to Blosser Road
[58:21]
rather than to 135. And there's
[58:23]
various alternatives. And then
[58:24]
the advisory committee really
[58:26]
advocated, including Stoll Road
[58:32]
as part of the network as well.
[58:33]
And okay, so this intersection
[58:35]
improvements at Betteravia and
[58:38]
Mahoney, that's a very funky
[58:39]
intersection today. It's a
[58:41]
picture of it in the top right.
[58:43]
But this is to make it more of
[58:45]
a traditional intersection.
[58:46]
This will facilitate goods
[58:48]
movement trucks as well as
[58:50]
safety for vehicular traffic.
[58:51]
So this is the signalized
[58:53]
version of the improvement. And
[58:55]
we also included a roundabout
[58:57]
version. You know folks have
[58:58]
mixed feelings about
[58:59]
roundabouts. And we heard that
[59:01]
loud and clear from the
[59:03]
advisory group as well as some
[59:04]
others in the public. But those
[59:06]
are options. And then last but
[59:09]
not least, the us 101
[59:10]
Betteravia interchange
[59:12]
improvement. So this is
[59:14]
changing the circulation of the
[59:16]
northbound ramps, but also
[59:18]
providing class one bike and
[59:20]
pedestrian facilities, as well
[59:24]
as intersection improvements at
[59:27]
at Nicholson as well. And this
[59:29]
is primarily driven by the need
[59:30]
to make sure Betteravia is
[59:33]
becoming a better Sta route.
[59:34]
There's already a lot of trucks
[59:37]
using it, so this will help
[59:38]
formalize that, but also the
[59:40]
city of Santa Maria, as part of
[59:41]
their general plan update, are
[59:43]
now targeting growth on the
[59:46]
east side of 101. And so you
[59:47]
you'll have residential and
[59:48]
then all the shopping
[59:49]
opportunities on the west side
[59:51]
of Betteravia. So you want to
[59:52]
make that more accessible to
[59:54]
pet and bikes as well as to
[59:56]
vehicles. And then the Santa
[59:58]
Maria levee, River Levee Trail
[1:00:01]
and that's included. This is a
[1:00:03]
very popular improvement, I
[1:00:04]
would say folks are concerned
[1:00:06]
about undue detour. Does it
[1:00:09]
really provide that that
[1:00:10]
parallel connection between
[1:00:13]
Santa Maria and Guadalupe? We
[1:00:16]
feel it does. But our analysis
[1:00:18]
did take into consideration the
[1:00:19]
buffer distance that people
[1:00:20]
would actually use this
[1:00:22]
facility to make those
[1:00:24]
connections. But make no
[1:00:25]
mistake, we recognize that
[1:00:27]
having a bike and ped facility
[1:00:31]
along the 166 is is much more
[1:00:32]
efficient, but again, it's much
[1:00:34]
more costly. This improvement
[1:00:35]
is moving along. It's already
[1:00:37]
in its environmental phase. And
[1:00:38]
so we're including it as part
[1:00:42]
of our package. And then here's
[1:00:44]
the, you know, the this the
[1:00:47]
widening. There you go. You can
[1:00:49]
see the bike path there, the so
[1:00:52]
the the profile cross section
[1:00:53]
in the middle. That's what
[1:00:55]
exists today. And you can see
[1:00:57]
the extent of what would be
[1:00:59]
required in terms of right of
[1:01:01]
way to make it a four lane
[1:01:04]
facility. Caltrans will need a
[1:01:07]
center median to a divider for
[1:01:09]
this. For safety, folks felt
[1:01:12]
from the stakeholder committee,
[1:01:13]
they questioned the need for
[1:01:15]
that. But I can guarantee you
[1:01:17]
Caltrans is going to want that.
[1:01:20]
And then the class one
[1:01:22]
bidirectional trail south side
[1:01:25]
of the state route 166. And
[1:01:27]
again, it comes at a hefty
[1:01:30]
price. So this is really only
[1:01:31]
possible, I think, as part of a
[1:01:34]
measure, a renewal package. And
[1:01:36]
then in terms of our
[1:01:36]
implementation, we looked at
[1:01:38]
all the various funding sources.
[1:01:40]
Again, as Maya said, we're
[1:01:42]
targeting at least for the the
[1:01:43]
package that we're identified
[1:01:46]
for these next 20 years, state
[1:01:47]
and federal grant funding to
[1:01:49]
try to get these projects
[1:01:53]
implemented. And then we phased
[1:01:54]
the improvements from short
[1:01:57]
term mid-term and then that
[1:01:59]
longer term 20 plus years. And
[1:02:00]
that's where you see the four
[1:02:02]
lane widening, as well as the
[1:02:06]
class one trail along 166. So
[1:02:08]
with that, I'll open it up to
[1:02:11]
questions. All right. Questions
[1:02:13]
among directors I see. Director
[1:02:14]
Lee, you have a question I do.
[1:02:16]
So the levee trail that you
[1:02:17]
spoke about, did you reach out
[1:02:20]
to the local farmers impacted
[1:02:22]
by that construction, or was
[1:02:25]
there any feedback or any
[1:02:28]
negative impacts to them? You
[1:02:32]
know? Director Lee, the Levee
[1:02:33]
Trail project is a county
[1:02:35]
project. We've included it
[1:02:36]
because it's moving forward.
[1:02:38]
It's complementary. It's
[1:02:40]
related to our study. So it's
[1:02:42]
the county that is advancing
[1:02:44]
the project. However, just on
[1:02:45]
our stakeholder advisory
[1:02:47]
committee, we did have
[1:02:48]
representatives of the
[1:02:50]
agricultural community that
[1:02:52]
were involved in the process.
[1:02:54]
And you did see on the when the
[1:02:55]
stakeholder Advisory Committee
[1:02:57]
took its support, don't support
[1:02:59]
votes that this is one of the
[1:03:02]
ones that had a couple do not
[1:03:03]
supports. Okay. And so going
[1:03:06]
back to the your study, did you
[1:03:07]
consider the early morning
[1:03:09]
traffic happens on the road?
[1:03:12]
Because we did from 2 to 5 I
[1:03:14]
believe it's like busy. Yes we
[1:03:17]
did. And that was a so there
[1:03:19]
was an early morning peak which
[1:03:21]
is at early Age-related Peak.
[1:03:24]
And we did the peak as well.
[1:03:26]
Got it. And adjusted completion
[1:03:28]
will help with that traffic
[1:03:29]
burden. And the completion of
[1:03:32]
this project will help with
[1:03:33]
that. Yes, yes. And the the
[1:03:35]
congestion that particularly in
[1:03:37]
Santa Maria that backs up for
[1:03:40]
that westbound trips in the Am
[1:03:41]
that drove a lot of the
[1:03:43]
improvements that you saw,
[1:03:45]
especially that the extension
[1:03:48]
of Hanson or 166 lane drop past
[1:03:50]
Hanson. Okay. That's the
[1:03:52]
benefit that issue as well.
[1:03:54]
There's you know, when we look
[1:03:56]
at the the congestion and the
[1:03:59]
travel time variance, we saw
[1:04:03]
that it was very unreliable on
[1:04:05]
an ongoing, you know, it was
[1:04:06]
reliably bad. That's what I'm
[1:04:07]
trying to say, which you don't
[1:04:09]
see very often. So it does
[1:04:10]
indicate a really significant
[1:04:12]
problem for that early morning
[1:04:13]
ag commute. And during your
[1:04:15]
study on the road, did you see
[1:04:17]
anybody going off road to
[1:04:18]
bypass the traffic? You know,
[1:04:20]
our roadway safety audit, we
[1:04:21]
did recognize that. But we
[1:04:23]
heard that plenty from the
[1:04:24]
public that folks use the
[1:04:25]
shoulder as a bypass lane. And
[1:04:27]
that's not good. So we we
[1:04:29]
recognize that as a major issue.
[1:04:31]
Thank you. Yeah. And I will say
[1:04:32]
that the stakeholder advisory
[1:04:34]
committee regarding the Santa
[1:04:36]
Maria River Levee trail, one of
[1:04:38]
the big concerns was, was there
[1:04:39]
going to be adequate fencing to
[1:04:41]
protect the ag fields from
[1:04:45]
folks who are using the
[1:04:50]
facility and cost estimates, as
[1:04:50]
well as our description of the
[1:04:50]
project is, yeah, it'll be two
[1:04:51]
layers of fencing to keep folks
[1:04:56]
from compromising or getting
[1:04:56]
into the I believe I spoke to
[1:04:56]
the farmers locally there and
[1:04:57]
they are concerned about people
[1:04:58]
that are going through the
[1:04:59]
landfill. That's very important.
[1:05:01]
Thank you for doing that. I
[1:05:02]
agree, thank you. Director Lee,
[1:05:03]
Director Hartman, director,
[1:05:04]
then director Lavagnino. And
[1:05:07]
then I'll go to Santa Maria. I
[1:05:09]
was just curious about your
[1:05:13]
analysis for benefit cost. So
[1:05:16]
the cost takes in the entire
[1:05:19]
set of projects, including the
[1:05:21]
vans and the bus transit.
[1:05:23]
Correct. And then describe more
[1:05:24]
how you calculate the benefit.
[1:05:26]
You said what wasn't part of it,
[1:05:29]
but how do you how do you nail
[1:05:31]
that down? Right. So yeah, you
[1:05:33]
know, costing improvements
[1:05:35]
that's been around for a long,
[1:05:36]
long, long, long time.
[1:05:38]
Engineers are very good at that.
[1:05:40]
Monetizing benefits is really
[1:05:42]
the the new aspect of of of all
[1:05:45]
this. And it's all based on
[1:05:46]
data that's published by
[1:05:47]
Caltrans. It's called the
[1:05:49]
societal costs. And they you
[1:05:51]
know, there's there's value to
[1:05:54]
time. So that value of time is
[1:05:56]
incorporated into delay
[1:05:58]
reduction travel time
[1:06:00]
reliability because it's called
[1:06:02]
buffer time. If you want to
[1:06:04]
reach your destination 95% of
[1:06:06]
the time, but because of the
[1:06:07]
conditions of the facility,
[1:06:09]
makes that very variable. And
[1:06:10]
we have 12 months of data to
[1:06:12]
show how variable it is. It's
[1:06:14]
the amount of time people have
[1:06:15]
to leave early to make sure
[1:06:17]
they can get to their
[1:06:19]
destination. 95% of the time,
[1:06:21]
that's their time. So it can be
[1:06:21]
monetized. You know, they'd
[1:06:23]
rather be at home with their
[1:06:25]
families than leaving early and
[1:06:27]
maybe arriving work early, but
[1:06:29]
maybe on time they don't know.
[1:06:31]
So that can all be monetized by
[1:06:33]
the value of time on road,
[1:06:36]
mobile source emissions, all
[1:06:38]
those, you know, criteria.
[1:06:39]
Health based pollutants have a
[1:06:41]
societal cost associated with
[1:06:42]
them. That's all been developed
[1:06:46]
by epa and Caltrans. And so we
[1:06:48]
have a whole list of all those
[1:06:51]
monetized costs that we can
[1:06:52]
calculate the measure
[1:06:54]
effectiveness and monetize that
[1:06:56]
benefit. And and then could you
[1:06:58]
elaborate on the gross regional
[1:07:01]
product, the 12 million value,
[1:07:03]
how that relates or doesn't. So
[1:07:04]
that that is a good question.
[1:07:06]
That is specific to the
[1:07:08]
construction activity. So
[1:07:09]
assuming that all the
[1:07:10]
improvements get constructed,
[1:07:13]
that's going to add jobs to the
[1:07:16]
construction sector. Yeah.
[1:07:17]
Thank you. All right. Thank you,
[1:07:18]
Director Hartman. Director
[1:07:20]
Lavagnino, thank you. And well,
[1:07:22]
first I just want to thank sb,
[1:07:25]
cag staff and the members that
[1:07:26]
this is this is something
[1:07:28]
that's been a long time coming.
[1:07:29]
I mean, this we probably should
[1:07:31]
have started this 15, 20 years
[1:07:32]
ago so that we were actually
[1:07:33]
doing work now instead of
[1:07:35]
looking at what we could be
[1:07:36]
doing. But, you know, we've got
[1:07:38]
a lot of priorities in this
[1:07:39]
county. So I understand. But
[1:07:40]
it's I appreciate where we are
[1:07:42]
right now. So can you just
[1:07:44]
refresh my memory when when
[1:07:47]
does measure a when do we
[1:07:50]
finish measure a expires in
[1:07:51]
2040 okay. This board has
[1:07:54]
directed to pursue a measure in
[1:07:57]
2032. Okay. Great. So so what
[1:07:59]
I'm hearing is in that short
[1:08:00]
term, those ones that you've
[1:08:01]
identified, which two of them
[1:08:02]
are actually construction on,
[1:08:04]
the other two are, you know,
[1:08:05]
kind of working around some,
[1:08:07]
some issues we're anticipating
[1:08:11]
we would do those before 2040
[1:08:13]
with the current measure a,
[1:08:14]
there is no measure a
[1:08:15]
identified for this corridor at
[1:08:17]
this point in time. So what
[1:08:18]
we're saying is we could
[1:08:20]
identify state funding and
[1:08:21]
federal funding possibly to to
[1:08:23]
to do these. It would be
[1:08:24]
outside these other ones that
[1:08:26]
are in the midterm. They would
[1:08:28]
be a a wish list that we would
[1:08:29]
send to voters that these are
[1:08:31]
things that we would like to
[1:08:32]
get done. And inside of that,
[1:08:34]
are we or are we not. Do you
[1:08:36]
anticipate now talking about
[1:08:37]
widening to four lanes, or is
[1:08:40]
that something outside of that?
[1:08:43]
It's up to this board okay.
[1:08:46]
Okay. So just I'm curious on
[1:08:47]
these just on these even in the
[1:08:49]
midterm ones, but on the even
[1:08:51]
in the intersection lighting
[1:08:52]
and the pavement driving is
[1:08:54]
that 42 million seems pretty
[1:08:56]
low to me, which it does. It's
[1:08:58]
only because we deal with so
[1:09:00]
many high numbers here. But is
[1:09:01]
that actually have we looked at
[1:09:03]
the right of way because some
[1:09:05]
of those farms I mean, I know
[1:09:06]
we're going to be taking
[1:09:08]
anytime you do any work on the
[1:09:09]
166, you're talking about
[1:09:11]
impacting Prime ag. And I'm
[1:09:13]
just curious if we've done
[1:09:14]
those studies, looked at that,
[1:09:16]
we did for the lighting. You
[1:09:18]
know, a lot of these are low
[1:09:20]
cost improvement concepts. And
[1:09:22]
so that's the beauty of it. But
[1:09:23]
very astute observation. 42
[1:09:25]
million in the big scheme of
[1:09:28]
things is not that much. And so
[1:09:30]
the lighting in terms of the
[1:09:32]
cobra heads and the poles, a
[1:09:33]
lot of that can be done within
[1:09:35]
right of way. So there wouldn't
[1:09:38]
be any take the driveway aprons.
[1:09:40]
That's a mix. There probably
[1:09:42]
will be some some right of way
[1:09:44]
that's not Caltrans to make
[1:09:46]
those effective. We think
[1:09:49]
that's a good public private
[1:09:51]
type of improvement that folks
[1:09:54]
can rally behind. But we'll see.
[1:09:58]
But I think most of the
[1:09:59]
businesses, the ag, they would
[1:10:00]
welcome that because it's a,
[1:10:02]
you know, it's a safety issue
[1:10:03]
for their people, their
[1:10:04]
vehicles, their workers. And
[1:10:06]
then final question, I guess,
[1:10:07]
is so in your professional
[1:10:09]
opinion, how do you think these
[1:10:11]
midterm projects would rack and
[1:10:13]
stack against, you know, as far
[1:10:16]
as being able to actually see
[1:10:17]
possibility of funding? Yeah,
[1:10:19]
it depends on the program
[1:10:20]
itself. One program that we
[1:10:22]
highlight that we feel is
[1:10:24]
probably the strongest is the
[1:10:25]
Trade Quarter Enhancement
[1:10:28]
program from Caltrans sb one,
[1:10:30]
and that is a competitive
[1:10:32]
program. I think we have a very
[1:10:35]
competitive benefit cost. We
[1:10:36]
have safety improvements. You
[1:10:38]
know, we have a lot of a good
[1:10:40]
mix of projects from transit
[1:10:43]
vans, you name it, driveway
[1:10:44]
aprons, which is very unique.
[1:10:45]
This is the first quarter study
[1:10:47]
that I've been a part of. I've
[1:10:49]
been part of too many. But that
[1:10:50]
driveway aprons was even an
[1:10:51]
improvement. So it's kind of
[1:10:55]
unique. So my my aspiration is
[1:10:56]
that we can compete well for
[1:10:57]
the trade quarter enhancement
[1:11:00]
program. Another good one is
[1:11:01]
highway Safety Improvement
[1:11:03]
program. Okay. Thank you. By
[1:11:05]
the way, that was former sb
[1:11:08]
member Larry Lavagnino calling.
[1:11:10]
I have a correction. There is a
[1:11:11]
project in the current measure,
[1:11:14]
a program that's the Betteravia
[1:11:15]
101 project that is funded
[1:11:16]
through the measure a, that we
[1:11:18]
will be applying for additional
[1:11:20]
funds to implement that project,
[1:11:22]
but it's not on the 166. So
[1:11:23]
thank you. Thank you. All right.
[1:11:25]
Thank you. I'm gonna go to
[1:11:26]
Santa Maria for some comments
[1:11:28]
or questions. Then I'm going to
[1:11:30]
come back up here for then for
[1:11:31]
Director Silva. Thank you. And
[1:11:34]
I know this is about the Bonita
[1:11:37]
Bonita school. And I know we've
[1:11:38]
had discussions about this
[1:11:39]
before. And Director Nelson, I
[1:11:41]
can't remember exactly what,
[1:11:44]
but I know that property was
[1:11:46]
deeded only to be used as a
[1:11:49]
school. And and so there's just
[1:11:52]
a lot of problems getting into
[1:11:53]
what happens. And I know the
[1:11:55]
school district spoke to us
[1:11:56]
several years ago, and you
[1:11:57]
probably know more about it
[1:12:00]
than I do, but it's it's really
[1:12:02]
a challenge to have to deal
[1:12:03]
with that. And of course, those
[1:12:05]
students do come from Santa
[1:12:06]
Maria and they are bust out
[1:12:11]
there. I want to ask about I
[1:12:14]
really want to confirm the the
[1:12:16]
time, the peak hours study
[1:12:19]
again, because you've got black
[1:12:20]
and betteravia, you've got
[1:12:22]
black and stole and you've got
[1:12:25]
Blosser that concern us. What
[1:12:30]
time was that peak hour study?
[1:12:32]
So the the what we're calling
[1:12:38]
the early am, I believe is from
[1:12:41]
5 to 6 and then the commuter Am
[1:12:44]
is the typical seven, you know,
[1:12:47]
8 to 9 or 730 to 830. I'll have
[1:12:48]
to check. And then the
[1:12:50]
traditional pm peak is 435
[1:12:55]
three. Because that 5:00 is
[1:12:57]
it's it's really important.
[1:12:58]
8:00 9:00 it doesn't really
[1:13:00]
matter because that's not when
[1:13:05]
that is so impacted there. On
[1:13:07]
Blosser and 166 we really need
[1:13:10]
the two left turn northbound
[1:13:15]
lanes going east, going north.
[1:13:17]
And I didn't see that there. So
[1:13:19]
that's something that we need.
[1:13:21]
Then coming down Blosser and
[1:13:24]
going west on 166 again that
[1:13:26]
left turn pocket gets gets
[1:13:28]
packed. It just gets packed.
[1:13:30]
The it is probably bumper to
[1:13:32]
bumper from Main Street all the
[1:13:35]
way up to probably betteravia.
[1:13:38]
I know pastel so that's really
[1:13:40]
an impact. And so that I know
[1:13:42]
when we went through the
[1:13:45]
roundabout issue and we did the
[1:13:50]
the signalized intersection at
[1:13:52]
166 and black, that went on for
[1:13:55]
years. And, and I went to all
[1:13:56]
those meetings with focus
[1:13:59]
groups. Not one person, not one
[1:14:01]
person at that time ever, ever
[1:14:04]
spoke in favor of a roundabout.
[1:14:06]
And yet we spent years going
[1:14:08]
through that. And it was it was
[1:14:11]
like Caltrans. Caltrans was
[1:14:13]
trying to push that on us, and
[1:14:14]
everyone was saying that it
[1:14:16]
doesn't work. So I just think
[1:14:17]
that those kinds of things are
[1:14:22]
important. The I'm thinking of
[1:14:25]
the day that we were out on 166
[1:14:27]
in black and celebrating the
[1:14:28]
intersection, and I'm sitting
[1:14:30]
there watching and there's chp
[1:14:32]
there, and a car runs the red
[1:14:35]
light and and then a little
[1:14:37]
while later, a truck runs the
[1:14:39]
red light. So it is a very,
[1:14:42]
very dangerous road. And during
[1:14:44]
those peak hours it's four
[1:14:46]
lanes and not two lanes. So
[1:14:49]
it's something that we between
[1:14:50]
Guadalupe and Santa Maria we do
[1:14:52]
care about. There's a lot of
[1:14:53]
accidents out there all the
[1:14:56]
time. And I want to ask you and
[1:14:57]
Margie, maybe you know this,
[1:14:59]
but I heard on the radio that
[1:15:00]
California has the most unsafe.
[1:15:03]
We're number one in the most
[1:15:05]
unsafe roads. And I didn't know
[1:15:10]
what study that was done.
[1:15:12]
Anyway, our public works
[1:15:13]
director is here. If he would
[1:15:19]
like to comment on anything.
[1:15:21]
Thank you. All right. Director
[1:15:22]
Patino, do you have a question
[1:15:24]
for him that you'd like to have
[1:15:27]
answered? Or you? I yes, for
[1:15:28]
you. I just wanted to make
[1:15:30]
those comments. Okay. Yeah.
[1:15:31]
Thank you. And if you'd like to
[1:15:32]
speak during public comment,
[1:15:33]
we'll absolutely give him that
[1:15:35]
opportunity to or the directors
[1:15:37]
up here or down there will have
[1:15:38]
some questions for him. We'll
[1:15:39]
make sure that's available.
[1:15:40]
Okay. And I'm sure Director
[1:15:42]
Julian has things to say. Thank
[1:15:43]
you. I'm sure he has director
[1:15:46]
Julian. Yes. Thank you for the
[1:15:47]
update. And one of the, one of
[1:15:49]
the things that local residents
[1:15:51]
are looking at, chp, I know
[1:15:53]
that there was a study with
[1:15:57]
about a quarter of the chp
[1:15:58]
ticketing, and that is a big
[1:16:00]
issue. We still have people,
[1:16:01]
especially if you're not going
[1:16:02]
to have a four lane for for
[1:16:05]
decades or whatever. We need
[1:16:07]
chp doing more of the, you know,
[1:16:09]
roads, routes out in that area.
[1:16:12]
You know, trucks are not a
[1:16:13]
problem. Maybe because we're
[1:16:15]
used to that. Trucks slow
[1:16:17]
people down to the 55 miles an
[1:16:19]
hour. So trucks, we have a good
[1:16:20]
relationship with the truckers.
[1:16:22]
And one of the things too, and
[1:16:24]
I know that director Nelson is
[1:16:27]
on caravans, but when people
[1:16:29]
from Santa Maria go to San Luis
[1:16:31]
County, across the bridge,
[1:16:32]
Santa Maria River bridge,
[1:16:35]
there's a lot of development,
[1:16:36]
not a lot of development, a lot
[1:16:39]
of grow. Right after the bridge
[1:16:41]
on the on the north side, north
[1:16:44]
side of the river, literally
[1:16:46]
hundreds of cars are there. And
[1:16:49]
we need to. And especially
[1:16:50]
Guadalupe. I know that there's
[1:16:54]
a call for more chp or Caltrans.
[1:16:56]
That's a good that's a that's
[1:16:57]
really necessary. But what we
[1:16:59]
need to do in terms of
[1:17:01]
Guadalupe is to make I see very
[1:17:03]
few caravans, vehicles in the
[1:17:05]
city of Guadalupe. And if we're
[1:17:07]
having 15 additional fans
[1:17:09]
really need to do our homework
[1:17:11]
and make sure that the local
[1:17:13]
farmworkers know that that's,
[1:17:14]
you know, that's there for
[1:17:15]
their use. Also, the increase
[1:17:18]
in road trips from an hour to
[1:17:19]
30 minutes to and from Santa
[1:17:21]
Maria is is really helpful for
[1:17:23]
the community of Guadalupe. And
[1:17:25]
then in the future, we've got
[1:17:27]
another 18 acres of commercial
[1:17:28]
that hopefully that'll be
[1:17:29]
developed to where people don't
[1:17:31]
have to go to Santa Maria for
[1:17:32]
every everyday shopping in
[1:17:35]
terms of groceries. And and
[1:17:38]
again, our most of our people
[1:17:39]
are employed in Santa Maria. So
[1:17:41]
it really makes a difference in
[1:17:42]
making improvements on this
[1:17:43]
highway. 166 so thank you for
[1:17:46]
the report. All right. Thank
[1:17:47]
you. Thank you, Director Julian.
[1:17:49]
Director Silva, thank you. Just
[1:17:51]
kind of piggybacking off of
[1:17:52]
what Director Hartman mentioned
[1:17:53]
with societal benefit. I just
[1:17:54]
was curious. I don't know if
[1:17:56]
it's the factoid of you saying
[1:17:57]
one hour equals one day of
[1:17:59]
shelf life, considering the
[1:18:00]
fact that we have a traffic
[1:18:02]
issue going on right now. I was
[1:18:03]
curious if you could maybe walk
[1:18:05]
through, do we anticipate while
[1:18:06]
we're looking at a 20 year
[1:18:07]
construction plan, whatever
[1:18:09]
that looked like, exacerbating
[1:18:10]
the traffic issue? And was that
[1:18:12]
analyzed in the cost of the
[1:18:14]
project, or are we I just don't
[1:18:15]
know how you would mitigate
[1:18:17]
that. Are we possibly as a body
[1:18:18]
just so that we're aware? Are
[1:18:20]
we going to have to expect that
[1:18:21]
there will be delays by nature
[1:18:23]
of construction taking place,
[1:18:25]
and that could impact the
[1:18:25]
transportation going on and
[1:18:27]
what that has been studied or
[1:18:30]
what that looks like. Okay. Two
[1:18:32]
questions. The first question
[1:18:34]
is that the the existing
[1:18:36]
conditions analysis was and the
[1:18:39]
public input predicated our
[1:18:40]
selection of the improvements.
[1:18:41]
But the performance analysis of
[1:18:43]
those improvements was based on
[1:18:45]
future conditions. And so we
[1:18:48]
rely on sb travel demand model
[1:18:50]
and other resources to know how
[1:18:52]
much traffic was going to grow.
[1:18:55]
So when these improvements were
[1:18:56]
operational, open to the public
[1:18:58]
and the traveling public, that
[1:19:00]
that benefit was derived from
[1:19:02]
the from future demand. So I
[1:19:04]
think that address your first
[1:19:07]
question. The second question,
[1:19:09]
can you repeat it? I'm sorry.
[1:19:10]
It's really just understanding
[1:19:12]
in in once these improvements
[1:19:14]
start taking place, do we have
[1:19:16]
an understanding of if we would
[1:19:17]
anticipate delays that will
[1:19:19]
have economic impact? Is there
[1:19:21]
ways that we have gone through
[1:19:22]
with how we're going to
[1:19:23]
mitigate that? I just wasn't
[1:19:24]
sure exactly of being mindful
[1:19:26]
of actions taken. It's not
[1:19:27]
saying we don't need to solve
[1:19:28]
the problem, but there's always
[1:19:30]
that when you're solving a
[1:19:31]
problem, you know, the
[1:19:32]
treatment can often cause some
[1:19:33]
issues. While we're going
[1:19:34]
through that, I just curious
[1:19:36]
what that looks like or if
[1:19:37]
we've done that study. No. Good
[1:19:38]
question. Construction, phasing
[1:19:39]
and delays associated with the
[1:19:40]
construction of improvements
[1:19:42]
that is not incorporated into
[1:19:44]
our study. Like I said before,
[1:19:45]
the good news is that many of
[1:19:47]
these are not significant in
[1:19:50]
terms of disruption to existing
[1:19:53]
traffic. In my opinion, the
[1:19:55]
experience that 166 and Black
[1:19:58]
Road, I don't know what the
[1:20:00]
history when that project was
[1:20:02]
implemented to install a signal,
[1:20:05]
but it would be similar to that
[1:20:07]
is a good analogy in terms of
[1:20:09]
disruption to traffic. Now, of
[1:20:11]
course, that longer term
[1:20:12]
improvement that's going to be
[1:20:14]
significant and construction
[1:20:16]
phasing will be pretty
[1:20:17]
complicated on how we can keep
[1:20:19]
the traffic moving on. 166
[1:20:21]
while that's being constructed,
[1:20:25]
if it ever does. Yeah, right.
[1:20:27]
Director Perotti. Thank you.
[1:20:31]
Chair. Going back to Director
[1:20:32]
Pitino's question about the
[1:20:35]
schools, the school. What's the
[1:20:36]
issue at the school? Is it
[1:20:39]
traffic? Getting into the class,
[1:20:41]
into school by parents? Is that
[1:20:45]
kids walking, biking busses?
[1:20:48]
What what's their their concern?
[1:20:49]
And I'm assuming you've gone to
[1:20:51]
the school and talked with the
[1:20:53]
parents. Yeah. So there's a
[1:20:56]
number of issues that go on. So
[1:20:58]
during school let out, there's
[1:21:00]
the queuing of the busses. And
[1:21:02]
our road safety audit was out
[1:21:04]
there to witness that firsthand.
[1:21:06]
And it's messy. All those
[1:21:08]
busses they queue up, there's
[1:21:10]
not enough storage for them in
[1:21:11]
terms of the internal
[1:21:12]
circulation where they pick up
[1:21:14]
the kids on campus, and then
[1:21:15]
they're all making a left
[1:21:16]
because they they all go to
[1:21:18]
Santa Maria, 100% of the
[1:21:21]
student body kids are living in
[1:21:23]
Santa Maria. Strangely, most,
[1:21:26]
if not all, the faculty come
[1:21:27]
down from the North because
[1:21:30]
they live in Nipomo and
[1:21:32]
elsewhere, and they use Santa
[1:21:34]
Benito School Road. And so it's
[1:21:36]
just it's kind of a confluence
[1:21:38]
there. So there's no formalized
[1:21:39]
parking really on campus. So
[1:21:42]
there's no stalls, white lines,
[1:21:44]
painting, striping. So we put a
[1:21:45]
lot of thought into that. But
[1:21:47]
you know that's just a concept,
[1:21:49]
you know, do you want diagonal
[1:21:50]
parking. Do you want you know
[1:21:51]
there's all these different
[1:21:52]
variables. But so that's an
[1:21:54]
issue in terms of just
[1:21:57]
circulation of the student body.
[1:21:59]
You know, the parents drive
[1:22:01]
their kids to. And so there's
[1:22:03]
just a the the confluence of,
[1:22:04]
of the vehicles from the
[1:22:06]
employees to the students. And
[1:22:07]
then that school let out time
[1:22:09]
with the queuing of the busses.
[1:22:10]
Okay. I was just curious about
[1:22:12]
what the problem was there.
[1:22:14]
Yeah. The stakeholder advisory
[1:22:16]
committee advocated really
[1:22:18]
putting in a a much more
[1:22:21]
prominent right turn
[1:22:23]
channelization from for
[1:22:24]
westbound traffic. And that's
[1:22:26]
mentioned in our report. It's
[1:22:28]
not technically included in the
[1:22:29]
improvement, but I think that's
[1:22:31]
had a lot of merit. So we
[1:22:33]
included it by okay. Thank you
[1:22:35]
reference. Thank you, Director
[1:22:36]
Parodi. And I actually would
[1:22:37]
like to speak to the school
[1:22:39]
issue just for a moment,
[1:22:40]
something that I've always kind
[1:22:41]
of been tracking as well. The
[1:22:43]
issue is it's four miles from
[1:22:44]
the nearest house to the school,
[1:22:46]
just all through this entire
[1:22:47]
traffic areas, there's nobody
[1:22:48]
riding their bikes, there's
[1:22:49]
nobody walking there. And it is
[1:22:52]
a traffic issue. I know you
[1:22:53]
mentioned the pesticide issue.
[1:22:55]
I think that that was
[1:22:56]
inappropriate. You know, that
[1:22:57]
site has been tested for the
[1:22:59]
last few years and they've had
[1:23:00]
a zero detect for pesticides.
[1:23:03]
So I know there's always that
[1:23:04]
concern out there. I think it's
[1:23:05]
the bigger concern is probably
[1:23:06]
the cooler with the ammonia
[1:23:07]
than there's actually
[1:23:08]
pesticides. There's a really a
[1:23:10]
great amount of responsible use
[1:23:11]
of pesticides in that area. And,
[1:23:13]
you know, in general, but
[1:23:14]
specifically because it's near
[1:23:16]
a school. So they've had a
[1:23:17]
again, a zero detect. So
[1:23:19]
actually no pesticides in the
[1:23:21]
actual regions. Sensor that's
[1:23:23]
put out by Department of
[1:23:25]
Pesticide Regulations is on the
[1:23:27]
fence line of the playground.
[1:23:28]
And again the zero detect. So
[1:23:29]
just want to make sure that was
[1:23:31]
you talk about that that you
[1:23:33]
don't spread any false
[1:23:34]
assumptions or rumors about
[1:23:36]
that. So no I totally
[1:23:37]
appreciate that. And that's
[1:23:38]
great news to hear. I would
[1:23:40]
just say fine. Particulates
[1:23:42]
with no herbicides or
[1:23:43]
pesticides attached to them is
[1:23:44]
not a good thing. So it's still
[1:23:46]
a health based issue.
[1:23:47]
Absolutely. But I do think that
[1:23:49]
the big issue for that for a
[1:23:50]
long time has been the traffic
[1:23:51]
issue. You know, there's this
[1:23:53]
is the most early on when I
[1:23:54]
started working for the county,
[1:23:56]
I heard from chp officer. They
[1:23:59]
said it's the most unmanned
[1:24:01]
vehicle accidents in the state
[1:24:03]
are on this. And I go, what do
[1:24:04]
you mean unmanned? Because
[1:24:05]
there's accidents and they show
[1:24:06]
up and there's nobody there.
[1:24:08]
And so they have the cars that
[1:24:10]
are there. So it's definitely a
[1:24:11]
corridor with many, many
[1:24:12]
accidents. Obviously we've been
[1:24:14]
talking about significantly the
[1:24:16]
traffic issues. My son actually
[1:24:19]
works at a farm at 166 in Black
[1:24:21]
Road. And so, you know, he
[1:24:22]
spends he lives five miles away
[1:24:24]
and it's a 30 minute plus drive
[1:24:26]
for him to get there. So I see
[1:24:28]
this and it impacts so many of
[1:24:30]
our residents, especially those
[1:24:31]
who have the least time to
[1:24:34]
share on on a commute. So a
[1:24:35]
couple a few things I just
[1:24:37]
wanted to. Also, did you guys
[1:24:38]
look at Black Road with the
[1:24:39]
flooding that happens there?
[1:24:41]
Did that? You know, you talked
[1:24:42]
about extreme weather events,
[1:24:45]
black road floods significantly,
[1:24:46]
multiple feet of water. Did you
[1:24:48]
guys kind of look at that as
[1:24:50]
part of the study? It was
[1:24:52]
brought to our attention in
[1:24:54]
terms of the vulnerability to
[1:24:56]
extreme weather events. I think
[1:24:59]
that's a chronic issue. But we
[1:25:02]
do identify quite a swath of
[1:25:04]
area that is subject at risk,
[1:25:08]
vulnerable to flooding. But
[1:25:09]
yeah, that that did come into
[1:25:11]
play. We did not explicitly try
[1:25:15]
to address the, you know, the
[1:25:17]
the flooding issue that
[1:25:19]
currently happens at that
[1:25:22]
location. You also went through
[1:25:23]
the truck routes, and I think
[1:25:25]
that got a lot of people's
[1:25:26]
attention. What's the next
[1:25:28]
steps on truck routes and that
[1:25:29]
conversation? Because I think,
[1:25:30]
you know, you presented a lot
[1:25:31]
of different options. I don't
[1:25:32]
know who makes those decisions,
[1:25:33]
whether that's our board or
[1:25:35]
that's someone else. I think
[1:25:37]
also the city of Santa Maria,
[1:25:38]
with the potential of the
[1:25:40]
Amazon Center in stool that
[1:25:41]
plays into it, you know, what
[1:25:43]
are all those things that we're
[1:25:44]
looking at. So who who makes
[1:25:46]
those next decisions on truck
[1:25:49]
routes. So. Well, I'll just say
[1:25:52]
it varies across the state.
[1:25:53]
Typically I think what's
[1:25:55]
typical they allow it to
[1:25:57]
organically happen. So it comes
[1:26:00]
from the, the the property
[1:26:01]
owners and the business owners
[1:26:04]
that they request through their
[1:26:07]
local agency or member regional
[1:26:10]
agency to ask Caltrans formally
[1:26:12]
designate and test it. So most
[1:26:14]
of the state does that. But
[1:26:15]
there are jurisdictions that
[1:26:17]
are more proactive. And I would
[1:26:18]
say this kind of a proactive
[1:26:20]
step that, hey, there's there's
[1:26:23]
there's no Sta routes east west,
[1:26:25]
that's a huge issue. And
[1:26:26]
everybody that we talked to
[1:26:28]
from the growers and shippers
[1:26:30]
and chp, it just has never
[1:26:32]
really formally been looked at.
[1:26:34]
And it's an issue because the
[1:26:38]
chp will not enforce the Sta
[1:26:39]
regulations because really the
[1:26:40]
truckers don't have any choice.
[1:26:42]
There's no signage, there's no
[1:26:44]
navigation. So they'll just go
[1:26:46]
where Siri tells them to go.
[1:26:47]
And sometimes they find
[1:26:48]
themselves on roadways that
[1:26:49]
were never designed to
[1:26:50]
accommodate those vehicles. And
[1:26:52]
you can see the damage at
[1:26:54]
intersections from the the
[1:26:55]
light poles and all that. They
[1:26:57]
have visible damage from the
[1:26:58]
trucks off tracking and not
[1:27:00]
being able to accommodate that
[1:27:02]
sharp of a turn. But I'll pass
[1:27:04]
it over to Margie. Sounds like
[1:27:05]
this is a perfect issue for sb
[1:27:07]
to take up at some point, maybe
[1:27:08]
within the North County
[1:27:09]
subregional, because we have
[1:27:11]
all the different parties that
[1:27:12]
are going to impact so so that
[1:27:14]
we can come up with something
[1:27:17]
to advocate to Caltrans to
[1:27:19]
formalize. So the steps in the
[1:27:21]
planning process is this is a
[1:27:22]
study and we incorporate it
[1:27:23]
into our regional
[1:27:23]
transportation plan. So it
[1:27:25]
could be an action item in our
[1:27:26]
next regional transportation
[1:27:28]
plan to identify a truck route
[1:27:30]
and working with Caltrans. So
[1:27:32]
all right. And just one thought
[1:27:33]
I had on the paved driveways.
[1:27:34]
You know, that seems like
[1:27:36]
that's a great public private
[1:27:37]
partnership opportunity. I
[1:27:39]
think if we gave encroachment
[1:27:41]
permits, many of those
[1:27:42]
landowners would actually
[1:27:43]
install those for us, which
[1:27:45]
would be a huge cost savings,
[1:27:46]
I'd imagine. So, you know,
[1:27:48]
could be one of those things
[1:27:49]
where the local jurisdictions
[1:27:50]
helped them with the permitting.
[1:27:52]
You know, that's our cost and
[1:27:54]
investment in those those farms
[1:27:56]
would put in the paving. I mean,
[1:27:57]
they're they have construction
[1:27:57]
material. They're able to do
[1:27:59]
those types of things. I know
[1:28:01]
that a lot of this is going to
[1:28:02]
be potentially on their
[1:28:03]
property as well. So I'm just
[1:28:05]
going to throw that out there
[1:28:06]
as a concept that I think would
[1:28:08]
be embraced. And then my last
[1:28:10]
final thought on this is that I
[1:28:11]
think that this is a great
[1:28:13]
start, but I think this needs
[1:28:15]
to be kind of a living document
[1:28:16]
for us, because there's other
[1:28:17]
things coming down the line. I
[1:28:19]
don't think Betteravia is a
[1:28:20]
settled idea of what is
[1:28:21]
proposed here. I think this is
[1:28:23]
just a concept. So I think
[1:28:24]
there's greater discussion
[1:28:25]
there. The city of Santa Maria
[1:28:27]
is looking at McCoy interchange,
[1:28:28]
what happens there and how that
[1:28:29]
impacts everything. And they
[1:28:30]
also are looking at bringing
[1:28:32]
McCoy out to Mahoney. You know,
[1:28:33]
the county at some point is
[1:28:35]
looking at Uni Valley Parkway
[1:28:36]
out to highway one. And so
[1:28:37]
having additional corridor
[1:28:38]
routes in the future and how
[1:28:39]
those all kind of play into
[1:28:41]
future investments, I think are
[1:28:42]
really important. So I think
[1:28:44]
that this is something we
[1:28:44]
should probably bring back
[1:28:46]
every couple of years and, and
[1:28:47]
maybe amend the study to the
[1:28:48]
current circumstances and the
[1:28:49]
current planning. You know, the
[1:28:51]
city of Santa Maria moves
[1:28:52]
forward, the Amazon Center.
[1:28:54]
Then this is this changes a lot
[1:28:55]
of things here. And we're going
[1:28:57]
to have to go refresh that as
[1:28:59]
well. So I just want to kind of
[1:29:00]
throw that out there for all of
[1:29:02]
us is to think about that. This
[1:29:04]
is a start. But we should
[1:29:05]
probably be, you know,
[1:29:06]
refreshing this on a on a
[1:29:07]
semi-regular basis for the
[1:29:08]
corridor chair. Nelson, when
[1:29:10]
you don't speak into the mic,
[1:29:11]
we can't hear you up here. I
[1:29:13]
apologize there, Director
[1:29:14]
Patino. I was trying to hide it
[1:29:15]
from you anyway, so it's all
[1:29:17]
good. All right, so, MADAM
[1:29:18]
Clerk, do we have any public
[1:29:20]
comment on this item? Chair,
[1:29:21]
I'm confirming written public
[1:29:22]
comment was received for this
[1:29:24]
item in advance. The comments
[1:29:24]
were uploaded online and
[1:29:26]
provided to the board, and
[1:29:27]
those comments were received
[1:29:29]
from Guthrie Leonard, Timothy.
[1:29:31]
Mahoney, Jeffrey. Jeffrey.
[1:29:33]
Wheeler. And if there are any
[1:29:34]
members of the public who wish
[1:29:36]
to speak on the zoom webinar,
[1:29:37]
please use the Raise Hand
[1:29:39]
feature and I will call upon
[1:29:40]
you. We do have one request to
[1:29:42]
speak in Santa Barbara and
[1:29:44]
three up north in Santa Maria.
[1:29:45]
And so our first speaker in
[1:29:46]
Santa Barbara is Barry. Remus.
[1:29:49]
If you can please come up to
[1:29:55]
the podium. Good evening.
[1:29:57]
Excuse me. Good afternoon,
[1:29:58]
Chair Nelson and directors. My
[1:30:00]
name is Barry Remus and I'm
[1:30:03]
with Santa Barbara County. We
[1:30:07]
countywide empower, educate and
[1:30:08]
advocate for those who walk,
[1:30:10]
bike and use public transit. So
[1:30:12]
what a perfect opportunity to
[1:30:15]
address the route 66 multimodal
[1:30:16]
corridor. And we really do want
[1:30:18]
to highlight the fact that
[1:30:20]
multimodal has been emphasized
[1:30:23]
or highlighted in the study
[1:30:26]
numerous times. And while we do
[1:30:27]
realize that this is clearly
[1:30:29]
going to be a large balancing
[1:30:33]
act of numerous priorities, and
[1:30:34]
recognizing the immense benefit
[1:30:36]
that this agricultural corridor
[1:30:38]
provides for everybody, we also
[1:30:40]
want to emphasize as well, that
[1:30:41]
it's more than just a truck
[1:30:44]
route, and that we fully
[1:30:47]
support the opportunity here,
[1:30:48]
and it certainly is an
[1:30:49]
opportunity. And also, Chair
[1:30:51]
Nelson, as you mentioned, to be
[1:30:52]
able to treat this as a living
[1:30:54]
plan that obviously will need
[1:30:56]
to be reevaluated and
[1:30:57]
reassessed as the years go on
[1:30:59]
and some things are going to
[1:31:00]
take a lot longer than others.
[1:31:02]
But while we certainly support
[1:31:03]
the class one multi-purpose
[1:31:04]
path that
[1:31:06]
would be fully
[1:31:07]
separated and protected for
[1:31:10]
active transportation users,
[1:31:11]
bike riders, pedestrians, and
[1:31:13]
also the ever growing bike
[1:31:14]
riding population, that is also
[1:31:16]
a lot of commuters. That would
[1:31:17]
probably be going back and
[1:31:19]
forth between farms as e-bikes
[1:31:21]
become more affordable. But
[1:31:24]
also and we're also on record,
[1:31:26]
supporters of the Santa Maria
[1:31:29]
levee Trail as and we
[1:31:30]
understand that there's the
[1:31:31]
balance between that, too. But
[1:31:32]
we feel that there are ways to
[1:31:34]
be able to work that
[1:31:36]
arrangement out, to be able to
[1:31:38]
provide protected space for the
[1:31:40]
agricultural owners, while also
[1:31:42]
providing a good alternative
[1:31:44]
route for active transportation
[1:31:46]
users from and to Guadalupe and
[1:31:49]
Santa Maria, but also the
[1:31:50]
agricultural workers and the
[1:31:51]
commuters, the farm workers
[1:31:53]
that depend upon transit, and
[1:31:56]
so that idea of increasing the
[1:31:59]
caravans opportunities and also
[1:32:00]
increasing the headways for
[1:32:04]
smart transit all, all, all are
[1:32:05]
wonderful ways that through
[1:32:07]
funding availability can be
[1:32:09]
more near-term solutions to be
[1:32:12]
able to address the county's
[1:32:14]
climate action plans, reducing
[1:32:16]
emissions, reducing vehicle
[1:32:19]
miles traveled, and also to be
[1:32:20]
able to provide for so many of
[1:32:22]
the agricultural workers coming
[1:32:24]
out of Guadalupe. To Director
[1:32:27]
Julian's points, to be able to
[1:32:28]
provide that opportunity for
[1:32:29]
them to get there safe routes
[1:32:31]
to school is paramount for us,
[1:32:32]
and we appreciate Director
[1:32:34]
Perotti's questions and MR.
[1:32:36]
Nelson's questions about the
[1:32:37]
school, any amount of dust
[1:32:39]
mitigation and the particulate
[1:32:40]
matter for the safety and the
[1:32:42]
future health of our children
[1:32:44]
is, is, is is an excellent idea
[1:32:47]
that the paved driveway aprons
[1:32:49]
as well. And just lastly also
[1:32:51]
going to point out that for the
[1:32:51]
Guadalupe side, we had to
[1:32:53]
highlight that Caltrans is
[1:32:54]
holding a community meeting
[1:32:57]
next Wednesday, the 21st, to
[1:33:00]
highlight Guadalupe oriented
[1:33:02]
action projects as well. So we
[1:33:04]
want to bid you all a Happy New
[1:33:06]
Year. And thank you very much.
[1:33:08]
Thank you. Our next speaker is
[1:33:09]
Claire Weinman, followed by
[1:33:25]
Brett Fulgoni. In Santa Maria.
[1:33:27]
Claire, you're up. We can't
[1:33:31]
hear you yet. Now we can now,
[1:33:34]
please. Good morning. My name
[1:33:35]
is Claire Wyman. I'm the
[1:33:37]
PRESIDENT Of the Grower Shipper
[1:33:37]
Association of Santa Barbara
[1:33:39]
and San Luis Obispo counties.
[1:33:41]
We appreciate the opportunity
[1:33:42]
to serve on the advisory
[1:33:43]
committee, and it's always a
[1:33:44]
pleasure to work with the sb,
[1:33:47]
cag team. This is an essential
[1:33:48]
corridor for safe and efficient
[1:33:50]
and effective movement of
[1:33:52]
people, equipment and fresh,
[1:33:55]
perishable produce. Agriculture
[1:33:56]
drives employment and
[1:33:57]
businesses that many rely on.
[1:34:00]
In North County. We've provided
[1:34:01]
detailed comments throughout
[1:34:02]
the process and would like to
[1:34:04]
highlight a few key points
[1:34:08]
before approval today. First,
[1:34:11]
our number one ask is widening
[1:34:12]
166 to 4 lanes in a modest,
[1:34:14]
compact design. We're sensitive
[1:34:16]
to the cost and complexity of
[1:34:18]
pursuing a very wide design and
[1:34:20]
would look to a modest and
[1:34:21]
achievable design which would
[1:34:23]
better suit the location and
[1:34:25]
use needs through a design
[1:34:28]
variance. As many of you are
[1:34:29]
already aware, we strongly
[1:34:31]
oppose the Santa Maria River
[1:34:32]
Levee Trail due to the
[1:34:34]
significant food safety and
[1:34:36]
operational concerns with that
[1:34:38]
specific location. As mentioned,
[1:34:40]
the majority of the advisory
[1:34:41]
committee also did not support
[1:34:44]
the trail at that location and
[1:34:46]
asked it to be removed from
[1:34:50]
this package. Many of you are
[1:34:51]
also aware of our concerns
[1:34:53]
about roundabouts and areas
[1:34:54]
frequented by agricultural
[1:34:56]
equipment, and specifically the
[1:34:58]
mix of vehicle types, and would
[1:35:00]
oppose roundabouts at Mahoney
[1:35:02]
Road and Betteravia and 101
[1:35:05]
favor Signalization for these
[1:35:08]
locations. Finally, we strongly
[1:35:10]
support a variety of east west
[1:35:11]
travel corridors for trucks.
[1:35:13]
This would provide resiliency
[1:35:15]
and reduce undue pressure on
[1:35:18]
any one pathway. We strongly
[1:35:19]
support maintaining Main Street
[1:35:22]
to 101 and further support
[1:35:24]
additional options for highway
[1:35:26]
one and semis, as well as Stoll
[1:35:28]
Road, Union Valley Parkway and
[1:35:31]
Clark. This would most closely
[1:35:32]
align with the modified
[1:35:33]
alternative five and six, and
[1:35:35]
would like to remain very
[1:35:38]
engaged in this process. We
[1:35:39]
appreciate your attention and
[1:35:41]
leadership to these important
[1:35:42]
details, and look forward to
[1:35:44]
continuing to serve our
[1:35:45]
community as these move forward
[1:35:47]
as projects. Thank you. Thank
[1:35:50]
you, MISS Wyman. And our next
[1:35:52]
speaker is Brett Fulgoni,
[1:35:56]
followed by Maribel Aguilera.
[1:35:58]
Good morning, Chair Nelson,
[1:36:00]
directors Brett Fulgoni, public
[1:36:01]
works director for the City of
[1:36:03]
Santa Maria. And first of all,
[1:36:06]
thank you all very much for the
[1:36:08]
work that went into this, this
[1:36:09]
study. A couple of things I
[1:36:11]
just wanted to comment on. I
[1:36:13]
recall back in NOVEMBER, there
[1:36:15]
was some discussion about and
[1:36:18]
you did listed in the the
[1:36:19]
comments that that you took
[1:36:21]
that information in. I didn't
[1:36:25]
see it analyzed in the options
[1:36:28]
analysis. So black and
[1:36:31]
betteravia stolen black. And
[1:36:33]
then also very importantly the
[1:36:34]
two the two left hand turn
[1:36:38]
lanes eastbound eastbound 166
[1:36:40]
onto northbound Blosser in
[1:36:41]
earlier Jim I heard talking
[1:36:44]
about the the am peak which I
[1:36:46]
think you nailed but I wasn't
[1:36:49]
sure about that pm peak. And we
[1:36:51]
see anecdotally the peak we
[1:36:53]
think is probably around 3 to 4
[1:36:55]
P.M. At that location where you
[1:36:57]
get that left hand turn
[1:36:59]
movement onto northbound. So
[1:37:02]
really stacking up west. So we
[1:37:03]
just want to make sure that
[1:37:05]
that, that that gets addressed.
[1:37:06]
Anecdotally we looked at it
[1:37:08]
through engineering on our team.
[1:37:10]
If we had four 11 foot lanes
[1:37:11]
through there, which would
[1:37:13]
require Caltrans design
[1:37:14]
exception, we think we could
[1:37:16]
get two left hand turn lanes
[1:37:18]
onto that northbound Gloucester
[1:37:20]
corridor. And so, you know,
[1:37:21]
perhaps a short term solution
[1:37:23]
could be a design exception
[1:37:24]
through 11 foot lanes. Then as
[1:37:27]
we move toward the medium, the
[1:37:29]
medium term, we could widen
[1:37:31]
that back out if needed because
[1:37:32]
of the truck traffic. Although
[1:37:34]
we do have many 11 and ten foot
[1:37:35]
lanes throughout the city of
[1:37:38]
Santa Maria on truck routes or
[1:37:41]
unofficial truck routes. Let's
[1:37:43]
see if I have anything else. So
[1:37:45]
yeah, I just want to make sure
[1:37:46]
that those intersections were
[1:37:47]
fully studied that I mentioned
[1:37:48]
and that we've captured the
[1:37:52]
correct pm peak on that
[1:37:54]
eastbound 166 to block. Thank
[1:37:57]
you. Thank you Brett. And our
[1:38:00]
next speaker is Maribel
[1:38:07]
Aguilera. Chair and chair and
[1:38:09]
members of the board I'm
[1:38:10]
Maribel Aguilera, Santa Maria
[1:38:12]
city council. I strongly
[1:38:15]
support the final State Route
[1:38:16]
166 Comprehensive Corridor
[1:38:18]
Study and urge approval today,
[1:38:19]
with a further consideration to
[1:38:21]
include the widening of the 166
[1:38:23]
to 4 lanes. The people of Santa
[1:38:25]
Maria Guadalupe deserve a safe,
[1:38:27]
reliable corridor connecting
[1:38:29]
our communities. Every day,
[1:38:31]
Guadalupe residents travel the
[1:38:33]
166 to reach medical
[1:38:35]
appointments, go shopping, get
[1:38:37]
to work and access essential
[1:38:38]
services in Santa Maria and
[1:38:40]
Santa Maria. Residents depend
[1:38:41]
on this same corner to reach
[1:38:43]
the coast. Some work in
[1:38:45]
Guadalupe, visit family and
[1:38:46]
support businesses throughout
[1:38:48]
the region. For too long, our
[1:38:50]
families have navigated roadway
[1:38:52]
plagued by safety concerns,
[1:38:55]
heavy agricultural traffic,
[1:38:57]
limited visibility, congestion
[1:38:59]
and inadequate infrastructure
[1:39:01]
at key intersections. We've had
[1:39:03]
far too many serious accidents
[1:39:04]
on this road over the years.
[1:39:06]
The study represents years of
[1:39:08]
thoughtful collaboration
[1:39:10]
between sb, cag, Caltrans,
[1:39:12]
Santa Barbara County and both
[1:39:13]
cities of Santa Maria Guadalupe,
[1:39:15]
and I am encouraged by the
[1:39:16]
strong community engagement.
[1:39:18]
Nearly 500 survey responses,
[1:39:20]
with outreach in both English
[1:39:22]
and Spanish at events such as
[1:39:24]
Mexican Independence Day
[1:39:26]
celebrations to our Parade of
[1:39:27]
Lights, and with the benefit
[1:39:30]
cost ratio of 2.66, this is
[1:39:33]
clearly a sound investment. The
[1:39:35]
identified improvements signal
[1:39:37]
signalization at Siemens Road,
[1:39:39]
enhanced lighting, intersection
[1:39:41]
safety upgrades and
[1:39:42]
transcendent Katzman's will
[1:39:44]
provide real safety and
[1:39:46]
operational benefits. However,
[1:39:48]
I do want to address the timing
[1:39:51]
and I do appreciate the request
[1:39:53]
for four lane widening because
[1:39:54]
that's really shouldn't be for
[1:39:56]
long term planning because the
[1:39:59]
need is now. During peak
[1:40:01]
traffic times, it takes 45
[1:40:02]
minutes to get from Santa Maria
[1:40:04]
to Guadalupe. So I'd really
[1:40:06]
encourage us to look at that
[1:40:07]
and widening the road and
[1:40:10]
looking at peak times 5 to 6
[1:40:13]
A.M. And 3 to 4 P.M. As someone
[1:40:14]
who has spent over a decade
[1:40:16]
serving our region's families
[1:40:17]
on the Planning Commission and
[1:40:19]
City council, I know firsthand
[1:40:21]
how critical this corridor is
[1:40:22]
to our community's well-being
[1:40:25]
and economic vitality. I ask
[1:40:26]
that you include the four lane
[1:40:29]
widening now, not as a long
[1:40:31]
term goal, because the families
[1:40:32]
of Guadalupe and Santa Maria
[1:40:34]
need that today. Thank you.
[1:40:37]
Thank you, COUNCILWOMAN. There
[1:40:38]
are no further requests to
[1:40:40]
speak. All right. Any other
[1:40:42]
questions from directors in
[1:40:48]
Santa Maria? Or comments? Did
[1:40:50]
you have a comment? No, I have
[1:40:52]
a comment on the comprehensive
[1:40:55]
corridor study that is part
[1:40:58]
part of the the River trail. I
[1:40:59]
should say the River trail is
[1:41:02]
part of that. That
[1:41:08]
comprehensive corridor study.
[1:41:11]
Director Patino, the the trail
[1:41:12]
along the levee is a county
[1:41:13]
project that was included in
[1:41:18]
the the study. Okay. And that
[1:41:20]
was already agreed to and
[1:41:22]
passed. But four years ago or
[1:41:24]
five years ago, I believe it's
[1:41:25]
my understanding that the
[1:41:26]
county agreed to fund certain
[1:41:29]
segment or certain phases. I
[1:41:30]
believe the environmental phase,
[1:41:34]
which is currently ongoing.
[1:41:36]
Thank you. All right. Any other
[1:41:38]
questions or comments? Santa
[1:41:41]
Maria? Yes. Yes there is.
[1:41:44]
Please. I've got a comment here.
[1:41:46]
What I made before and it's in
[1:41:48]
regards to the trail. I know
[1:41:50]
the county is well aware that
[1:41:51]
they have a superior court
[1:41:53]
ruling about introduction of
[1:41:55]
people and pests into
[1:41:56]
environmentally sensitive
[1:41:57]
habitats, and how would you be
[1:41:58]
getting around the Superior
[1:42:01]
Court ruling by obviously
[1:42:02]
introducing people and pets
[1:42:04]
into environmentally sensitive
[1:42:07]
habitats, agriculture, as it's
[1:42:08]
recognized in the Superior
[1:42:10]
Court ruling. So it seems to me
[1:42:11]
that you're doing kind of the
[1:42:13]
opposite of mandates that
[1:42:14]
you've done in other areas of
[1:42:17]
the county. But buyer beware
[1:42:19]
with a trail, because I can
[1:42:20]
guarantee what's going to
[1:42:21]
happen. You might as well just
[1:42:22]
call it the strawberry picking
[1:42:24]
trail or something like that.
[1:42:25]
But I've advised before that if
[1:42:27]
you want to see what happens
[1:42:28]
when you put trails in these
[1:42:30]
type of areas, come to Lompoc.
[1:42:31]
There's plenty of video that
[1:42:34]
show out what happens there.
[1:42:36]
But just for the record, I it
[1:42:38]
just very curious how the
[1:42:40]
county in one area can say no
[1:42:43]
to recreation and trails in one
[1:42:44]
area, but another area they can
[1:42:46]
just turn a blind eye to it,
[1:42:48]
even when the people owning the
[1:42:49]
property around are saying no
[1:42:53]
and it moves forward. All right.
[1:42:55]
Thank you. Director, can I. Can
[1:42:57]
I answer that? Sure. Yeah,
[1:42:58]
absolutely. Director. So as far
[1:43:00]
as calling it a blind eye,
[1:43:02]
we've studied this thing upside
[1:43:03]
down, backwards and frontwards.
[1:43:07]
It has had plenty of public
[1:43:10]
comment. The project that is
[1:43:13]
that there is really no even
[1:43:15]
we're in the very beginning
[1:43:16]
stages of this. We all
[1:43:17]
understood the reason why it's
[1:43:20]
not done right now is because
[1:43:22]
of the farmers input, and we
[1:43:23]
realize that we can't do it
[1:43:24]
without a huge investment that
[1:43:29]
would include lighting, fencing,
[1:43:33]
paving, all kinds of
[1:43:34]
engineering to keep people out
[1:43:36]
of those fields. So staffing,
[1:43:39]
staffing, if if we had turned a
[1:43:40]
blind eye, we would have said,
[1:43:42]
okay, here's a Santa Maria
[1:43:43]
River levee trail and it's open
[1:43:45]
and all hell would have broke
[1:43:47]
loose. So because of the input
[1:43:49]
of the farmers and our ability
[1:43:51]
to then dial it way down and
[1:43:53]
say, okay, this obviously is an
[1:43:56]
area of concern. I got to be
[1:43:57]
honest, I think it has not been
[1:43:59]
in blind eye. We've gone in
[1:44:00]
with eyes wide open and tried
[1:44:02]
to listen to what the comments
[1:44:05]
were and change what even the
[1:44:07]
proposal is. That's why it's
[1:44:09]
not going to happen tomorrow.
[1:44:10]
It's not going to happen next
[1:44:12]
Friday. It is a long term
[1:44:14]
project that is going to take a
[1:44:15]
lot of funding to do it the
[1:44:18]
right way. So the reason why
[1:44:19]
it's going to take a long time
[1:44:22]
is because we have decided to
[1:44:23]
really implement everything
[1:44:24]
that we've heard from the
[1:44:27]
public. So, you know, I think
[1:44:29]
it's easy to throw rocks at
[1:44:32]
this and act like nobody's
[1:44:34]
paying attention to it when the
[1:44:36]
exact opposite is true.
[1:44:37]
Everybody's paying attention to
[1:44:38]
it. We're on top of it, and
[1:44:40]
we're really analyzing it. So I
[1:44:41]
just want the public to
[1:44:43]
understand that this is not
[1:44:45]
just a Wild West, free for all
[1:44:46]
trail running through ag
[1:44:47]
property. All right. I want to
[1:44:49]
kind of bring this back though.
[1:44:51]
So this is just referenced in
[1:44:53]
the study. And today all we are
[1:44:54]
doing is receiving and filing
[1:44:56]
the study. Right. We're not
[1:44:57]
actually adopting these
[1:44:59]
projects any of these designs.
[1:45:01]
We're just hearing a
[1:45:02]
presentation on what we paid
[1:45:05]
for. We are asking for the
[1:45:08]
board approval as a study. And
[1:45:09]
then it gets incorporated into
[1:45:10]
the plan as priorities as we
[1:45:12]
move forward. So the board will
[1:45:14]
have discretion on what
[1:45:15]
priorities get incorporated
[1:45:16]
into the regional
[1:45:17]
transportation plan as we move
[1:45:19]
forward. But this is just basic
[1:45:21]
information to inform your
[1:45:22]
future decision making, right?
[1:45:24]
So no actual decisions will be
[1:45:26]
made on projects or designs at
[1:45:27]
this point. Correct? Correct. I
[1:45:29]
just want to make sure I think
[1:45:31]
it's a good, good discussion
[1:45:32]
debate, and it's good to get
[1:45:33]
information out there. I
[1:45:34]
appreciate both perspectives
[1:45:35]
and having that opportunity to
[1:45:37]
say that, but I do want to get
[1:45:38]
us moving along towards
[1:45:39]
finishing up this item so we
[1:45:41]
can get this meeting finished
[1:45:42]
in a timely manner. So with
[1:45:44]
that supervisor sorry, Director
[1:45:49]
Hartman. Go ahead. Okay. All
[1:45:52]
right. So not seeing too many
[1:45:54]
other lights up here. Any other
[1:45:56]
lights again that could get us
[1:45:58]
back to this item is to receive
[1:46:00]
this study. The action on the
[1:46:02]
agenda is to approve the final
[1:46:04]
study, the comprehensive
[1:46:05]
corridor study, and to direct
[1:46:07]
staff to file a notice of
[1:46:07]
exemption with the Santa
[1:46:10]
Barbara clerk for a sequa. So
[1:46:12]
the study is not an
[1:46:13]
environmental document, though.
[1:46:15]
It's it's exempt from
[1:46:16]
environment because it's just a
[1:46:17]
study. You're not making
[1:46:18]
official decisions or
[1:46:20]
priorities. It's information
[1:46:22]
for your future decision making
[1:46:23]
okay. We're not making those
[1:46:26]
decisions today. All right. So
[1:46:28]
I just need a motion to that
[1:46:29]
motion okay. Motion from
[1:46:32]
Hartman and a second from Silva.
[1:46:33]
Further discussion. Supervisor
[1:46:36]
or director Patino. Yes. I
[1:46:38]
would really like to go on
[1:46:39]
record saying I do oppose the
[1:46:41]
River trail being in on that
[1:46:43]
study. And I know we've gone
[1:46:44]
through it over and over. I
[1:46:46]
don't think that people realize
[1:46:48]
the impact and the challenges
[1:46:50]
to the growers in our community,
[1:46:52]
and they are extremely
[1:46:54]
important. Ag is the the engine
[1:46:57]
that fuels our community. And i
[1:46:59]
just I didn't like it when it
[1:47:01]
was passed and I don't like it.
[1:47:03]
I don't like it now. I just I
[1:47:04]
don't think people realize that
[1:47:06]
even with birds going into
[1:47:09]
fields and contaminating
[1:47:11]
whatever is going in the fields
[1:47:13]
makes those fields unusable.
[1:47:14]
And, and I think when you've
[1:47:16]
got people going down the levy
[1:47:17]
on their bicycles and they have
[1:47:19]
their dogs with them, and I
[1:47:20]
realize we have in here is
[1:47:22]
going to do fencing, but
[1:47:24]
somehow we go down the road and
[1:47:26]
things get turned around. And
[1:47:28]
so I would love to see if that
[1:47:30]
could be removed from this
[1:47:32]
study, the approval of the
[1:47:36]
study. Thank you. Other
[1:47:37]
comments on the motion that we
[1:47:41]
have right now. Okay. I see no
[1:47:43]
additional comments on the
[1:47:44]
motion. MADAM Clerk, can you
[1:47:47]
please have a roll call? Vote.
[1:47:49]
Director. Rouse. Director.
[1:47:55]
Perotti. Director. Patino. No.
[1:47:58]
Director. Mosby. No. Director.
[1:48:02]
Lee. Hi. Director. Lavagnino.
[1:48:06]
Director. Julian. Hi, director.
[1:48:09]
Hartman, I. Director. Clark.
[1:48:12]
Director. Capps. Director.
[1:48:14]
Brown, I vice chair. Silva, I
[1:48:17]
and chair. Nelson, I. Motion
[1:48:21]
passes. 11 two. Do you mind
[1:48:22]
calling out just the number for
[1:48:24]
the public? Was that what it
[1:48:26]
was? Yes, it was 11 to 2. Thank
[1:48:28]
you. All right. We're moving on
[1:48:31]
to our final discussion item,
[1:48:33]
item five c. MADAM Clerk, would
[1:48:34]
you please read that into the
[1:48:36]
record? Expanded peak hour
[1:48:38]
intercity rail service update.
[1:48:40]
Recommended actions, received
[1:48:40]
presentation and provide
[1:48:42]
direction to staff regarding
[1:48:43]
the proposal by the Los Angeles,
[1:48:46]
San Diego, San Luis Obispo Rail
[1:48:48]
Corridor Agency to operate
[1:48:49]
expanded intercity passenger
[1:48:50]
rail service between Ventura
[1:48:53]
and Santa Barbara counties. MR.
[1:49:00]
Bonfiglio, please. Good morning.
[1:49:03]
All right. Good morning, MR.
[1:49:05]
Chair. Board of Directors. For
[1:49:06]
the record, my name is Aaron
[1:49:07]
Bonfiglio, director of
[1:49:10]
multimodal programs for sb cag.
[1:49:11]
And with me today is Jason
[1:49:13]
Jewell from the Rail Corridor
[1:49:14]
Agency, the managing director,
[1:49:19]
to help with the presentation.
[1:49:21]
So today's presentation and
[1:49:22]
we'll try to move through it
[1:49:24]
quickly. I don't want to stand
[1:49:26]
between you all and lunch. It's
[1:49:29]
a hard place to be. We'll
[1:49:30]
provide you all with a quick
[1:49:31]
background of this project
[1:49:34]
where we are with regard to Los
[1:49:36]
Angeles and board direction. As
[1:49:38]
far as their updated proposal
[1:49:39]
is concerned, because there was
[1:49:41]
some action at the recent board
[1:49:43]
that has triggered some new
[1:49:44]
information. And then next
[1:49:54]
steps with regard to timeline.
[1:49:56]
Okay. We'll try again. All
[1:49:58]
right. New clicker. So as the
[1:50:02]
board will recall in 2018 sb
[1:50:05]
cag began a service with the
[1:50:06]
Pacific Surfliner, the rail
[1:50:09]
corridor agency, to operate
[1:50:10]
additional train service from
[1:50:12]
the south into Santa Barbara
[1:50:13]
County to address the peak hour
[1:50:15]
morning commute period. This is
[1:50:17]
a long standing commitment that
[1:50:19]
sb cag has made to the voters.
[1:50:21]
The Lane and a train was part
[1:50:24]
of the 2008 measure, a renewal
[1:50:27]
or push for the current local
[1:50:29]
self-help sales tax measure
[1:50:32]
that's here today, and we've
[1:50:33]
achieved much of the lane and
[1:50:35]
had fits and starts with the
[1:50:37]
train. So as it relates to our
[1:50:39]
ongoing efforts, I'm here to
[1:50:40]
tell you that we have some good
[1:50:42]
news. Over the past two years,
[1:50:43]
we've been working very closely,
[1:50:45]
both with Lausanne and our
[1:50:46]
partners in Ventura County, but
[1:50:48]
also with the regional Rail
[1:50:49]
Authority in Southern
[1:50:51]
California, Metrolink, to come
[1:50:52]
up with a solution to help
[1:50:54]
expedite additional train
[1:50:57]
service. Over the years. We had
[1:50:59]
a discussion with this group
[1:51:02]
that effectively was to provide
[1:51:05]
on loan a slot from the Rail
[1:51:06]
Corridor Agency that they have
[1:51:09]
track access to. With the Union
[1:51:10]
Pacific right of way. It's very
[1:51:12]
important. U.P. Is the owner of
[1:51:15]
the tracks from for much of our
[1:51:17]
area as far north as the Bay
[1:51:19]
area, and in order to operate
[1:51:21]
trains, Union Pacific must
[1:51:23]
provide that access and we must
[1:51:26]
reimburse them. Lausanne has
[1:51:27]
access as well as Metrolink
[1:51:28]
throughout the Southern
[1:51:30]
California area, but
[1:51:31]
effectively Lausanne was unable
[1:51:33]
to provide the additional train
[1:51:34]
service when we went back to
[1:51:37]
them in 2022, in early 2023,
[1:51:39]
and creatively, they suggested
[1:51:40]
that, you know who does have
[1:51:41]
train equipment that could
[1:51:42]
operate this service. Well,
[1:51:44]
maybe they don't have access is
[1:51:46]
Metrolink. And so we began on
[1:51:47]
an effort to work with both
[1:51:49]
Metrolink and Lausanne in our
[1:51:50]
in our partners in Ventura
[1:51:52]
County to establish a set of
[1:51:54]
agreements that would allow for
[1:51:56]
Metrolink to temporarily use
[1:51:58]
Lausanne's track access for a
[1:51:59]
period of time until such time
[1:52:01]
that Lausanne could operate
[1:52:03]
additional Pacific Surfliner
[1:52:04]
services funded by the state,
[1:52:06]
and through the additional
[1:52:07]
equipment that they would need
[1:52:09]
in order to operate. We got
[1:52:11]
very far along and earlier this
[1:52:12]
summer approached Union Pacific
[1:52:15]
with approximately eight months
[1:52:16]
to go before our anticipated
[1:52:19]
start date. Union Pacific was
[1:52:21]
initially receptive to the idea
[1:52:23]
and began to review some of the
[1:52:25]
internal or the initial
[1:52:26]
documents, preliminary
[1:52:28]
schedules and so forth. But but
[1:52:30]
the bottom line was, is that
[1:52:31]
Union Pacific has a process
[1:52:32]
that it must go through, and
[1:52:33]
that Lausanne's agreement with
[1:52:36]
U.P. Specifically identified
[1:52:37]
Amtrak as the operator of
[1:52:39]
record on any of the Up
[1:52:41]
corridor north of Moorpark
[1:52:43]
station. In addition to
[1:52:45]
Metrolink and Ventura County,
[1:52:47]
in order to utilize Lausanne's
[1:52:49]
agreement, an additional
[1:52:51]
agreement with U.P. Would be
[1:52:52]
required. And while U.P. Was
[1:52:54]
receptive and eager for
[1:52:58]
business, they had to let us
[1:53:00]
know in no uncertain terms that
[1:53:01]
they had other priorities, and
[1:53:03]
in particular, their merger
[1:53:05]
with Norfolk Southern was
[1:53:06]
underway, and there was quite a
[1:53:07]
bit of scrutiny that they had
[1:53:09]
to address and would be able to
[1:53:11]
review our proposal and our
[1:53:13]
agreement options in the
[1:53:16]
beginning of 2026. As I
[1:53:17]
mentioned, this is an effort
[1:53:19]
that to put this train into
[1:53:20]
service with additional train
[1:53:22]
service since 2008, if not
[1:53:24]
prior to that. I think the
[1:53:26]
first study I read, looking at
[1:53:27]
train service in the corridor,
[1:53:30]
was done by Scag in 1998, if
[1:53:32]
not a little bit earlier than
[1:53:33]
that. The final report before
[1:53:35]
both Santa Barbara and Ventura
[1:53:37]
counties around that time, and
[1:53:39]
at that time, and most recently
[1:53:43]
in 2000, seven studies were
[1:53:45]
done that showed that Lausanne
[1:53:47]
was ultimately the best
[1:53:48]
available operator to operate
[1:53:50]
additional peak hour service.
[1:53:52]
Because a simple retiming, or
[1:53:53]
what we presume would be a
[1:53:54]
simple retiming, would be the
[1:53:56]
best way to go, as there is
[1:53:57]
already a state supported
[1:53:59]
service. So we did that in 2018
[1:54:01]
and unfortunately, during the
[1:54:03]
pandemic, due to declining
[1:54:04]
ridership and some changes with
[1:54:05]
the availability of train
[1:54:06]
equipment, we were unable to
[1:54:08]
reestablish that service. Hence
[1:54:11]
the Metrolink expansion option.
[1:54:13]
As I mentioned, U.P. Responded
[1:54:15]
to Lausanne this summer and a
[1:54:16]
little bit after our last
[1:54:17]
presentation, which was in
[1:54:20]
AUGUST of 2025, to the board,
[1:54:21]
that they would be able to
[1:54:24]
begin on that agreement in 2026.
[1:54:28]
Unfortunately, Union Pacific
[1:54:30]
had indicated to both Lausanne
[1:54:32]
and Metrolink that there'd be
[1:54:33]
some additional requirements or
[1:54:34]
potentially new requirements on
[1:54:36]
Lausanne Agreement with them,
[1:54:37]
which opens up a new can of
[1:54:38]
worms where Lausanne previously
[1:54:40]
already has access to that
[1:54:43]
service. In NOVEMBER of 2025,
[1:54:46]
Lausanne's board took action to
[1:54:49]
prioritize their Amtrak Pacific
[1:54:50]
Surfliner service as the
[1:54:52]
temporary period of time, which
[1:54:53]
we envisioned Metrolink to
[1:54:55]
operate was quickly coming on
[1:54:59]
to the horizon. So effectively,
[1:55:01]
Lausanne had seen some
[1:55:02]
expansion or, excuse me,
[1:55:04]
increase in their train
[1:55:06]
capacity, their train equipment
[1:55:07]
capacity. They had ability to
[1:55:09]
operate additional services.
[1:55:10]
We're looking towards expansion
[1:55:12]
in the near term. And
[1:55:14]
Metrolink's proposal, which was
[1:55:15]
still yet to be determined and
[1:55:17]
finalized with Union Pacific,
[1:55:19]
calls for two conflicting
[1:55:22]
efforts. And where we are today
[1:55:23]
is to bring you that update on
[1:55:25]
how Lausanne's board saw fit to
[1:55:27]
work with sb cag in Ventura
[1:55:30]
County to still achieve that
[1:55:32]
expansion, but to do so with an
[1:55:33]
alternative proposal. And so
[1:55:35]
here with me today, I mentioned
[1:55:36]
Jason Doyle. He's going to
[1:55:37]
bring you some additional
[1:55:39]
information regarding the
[1:55:41]
latest Lausanne board activity,
[1:55:42]
as well as briefly describe
[1:55:45]
some of the proposal. It's down
[1:55:53]
to click forward. Great. Gets
[1:55:57]
set up real quick. Great. Thank
[1:55:59]
you Aaron and good morning
[1:56:00]
Chair Nelson and members of the
[1:56:01]
board. As Aaron mentioned my
[1:56:03]
name is Jason Jewell. I'm the
[1:56:04]
managing director of the
[1:56:05]
Lausanne Rail Corridor Agency.
[1:56:07]
And I wanted to mention that I
[1:56:08]
am a ucsb graduate and started
[1:56:10]
my career in government service
[1:56:12]
many moons ago with the County
[1:56:13]
of Santa Barbara, right here in
[1:56:15]
this building. And I don't want
[1:56:17]
to age myself. But that was
[1:56:18]
back when Congressman Salud
[1:56:20]
Carbajal worked for First
[1:56:21]
District Supervisor Naomi
[1:56:23]
Schwartz. And the reason why I
[1:56:24]
mentioned this is because I
[1:56:26]
used to take the Amtrak Pacific
[1:56:29]
Surfliner train to Santa
[1:56:30]
Barbara, back to my home in
[1:56:32]
Ventura County. And I also used
[1:56:34]
to drive the 101 many times to
[1:56:36]
get to and from home. So I
[1:56:38]
recognize the importance of
[1:56:40]
having multiple transportation
[1:56:41]
options for the region. And I'm
[1:56:43]
here today representing the
[1:56:44]
Lausanne Rail Corridor Agency,
[1:56:46]
of course. And we also
[1:56:48]
recognize the importance of
[1:56:49]
alternative transportation
[1:56:51]
options and specifically
[1:56:53]
intercity rail options as
[1:56:54]
transportation focal point of
[1:56:56]
ours. And I wanted to just take
[1:56:58]
a few minutes to give you a
[1:56:59]
little bit of background on the
[1:57:01]
Lausanne Rail Corridor Agency.
[1:57:03]
We are a joint powers authority
[1:57:05]
with nine member agencies
[1:57:07]
comprised of regional
[1:57:08]
transportation and planning
[1:57:09]
agencies, as well as rail
[1:57:11]
owners and operators spanning
[1:57:13]
six counties from San Diego all
[1:57:15]
the way up to San Luis Obispo.
[1:57:18]
And sb 1225 is really the
[1:57:19]
legislation that paved the way
[1:57:21]
for the Lausanne Agency to
[1:57:22]
manage the Amtrak Pacific
[1:57:23]
Surfliner intercity rail
[1:57:25]
service, which we have been
[1:57:27]
doing successfully since 2015.
[1:57:29]
Now we have an 11 member board
[1:57:31]
and which I'd like to recognize
[1:57:33]
and thank director Perotti for
[1:57:35]
her representation and support
[1:57:38]
on our board, as well as
[1:57:40]
Alternate Director Lee, and
[1:57:42]
touch upon the intercity rail
[1:57:43]
corridor and the service itself.
[1:57:45]
Real quickly. The Amtrak
[1:57:47]
Pacific Surfliner service spans
[1:57:49]
the entire length of the
[1:57:51]
corridor, which is 351 miles
[1:57:54]
long. We currently stop at 29
[1:57:56]
stations, and it is the
[1:57:57]
nation's second busiest
[1:57:59]
intercity rail corridor in
[1:58:00]
terms of ridership outside of
[1:58:03]
the Northeast Corridor. The
[1:58:05]
corridor itself is very unique.
[1:58:07]
It has seven right of way track
[1:58:09]
owners, two freight operators,
[1:58:12]
a Up and bsf, as well as two
[1:58:14]
commuter regional rail services.
[1:58:16]
In addition to that, the us
[1:58:17]
Department of Defense has
[1:58:19]
identified it as part of the
[1:58:20]
Strategic Rail Corridor network
[1:58:22]
for its access to the Marine
[1:58:24]
Corps Base Camp Pendleton down
[1:58:26]
in San Diego, as well as the
[1:58:28]
Port of San Diego. So I wanted
[1:58:30]
to dive a little deeper into
[1:58:32]
the effort that Aaron had been
[1:58:34]
talking about, that we have
[1:58:36]
before you today, as we have
[1:58:38]
been working to expand
[1:58:40]
intercity rail service. And I
[1:58:41]
wanted to start off by thanking
[1:58:43]
both the sb, cag team as well
[1:58:46]
as the ctc teams for their
[1:58:47]
coordination and support
[1:58:49]
through this effort. But most
[1:58:52]
of all, their patients. As as
[1:58:53]
mentioned, this has been a long
[1:58:55]
time coming. This started off
[1:58:58]
as a request several years ago
[1:59:00]
from sb, cag, and vtc to the
[1:59:02]
Lausanne Agency to support
[1:59:03]
restoring peak period service
[1:59:06]
to the regions, and at that
[1:59:07]
time, we did not have the
[1:59:09]
equipment, resources available
[1:59:11]
or the funding available to run
[1:59:13]
the service. However, it has
[1:59:14]
always been the intent and
[1:59:15]
included in the plans of the
[1:59:17]
Lausanne Agency to implement
[1:59:19]
expanded service to Goleta as
[1:59:21]
well as San Luis Obispo, which
[1:59:22]
is included in our annual
[1:59:25]
business plans for fiscal year
[1:59:26]
2627 and consistent with State
[1:59:29]
Rail Plan goals. So, as Aaron
[1:59:31]
mentioned, together we explored
[1:59:33]
the possibility of
[1:59:34]
subcontracting the service to
[1:59:36]
Metrolink and allowing them to
[1:59:38]
temporarily utilize the
[1:59:40]
Lausanne Agency's track access
[1:59:41]
rights that we currently have
[1:59:43]
with Union Pacific. We have
[1:59:44]
this access agreement directly
[1:59:46]
with Union Pacific, which
[1:59:48]
currently allows us to run the
[1:59:49]
Amtrak Pacific Surfliner
[1:59:52]
service. So the Lausanne sb,
[1:59:54]
cag, ctc and Metrolink teams
[1:59:56]
worked together on this path
[1:59:57]
when really two major milestone
[1:59:59]
or events happen that created
[2:00:01]
the opportunity that we
[2:00:02]
currently have before us. And
[2:00:04]
these events do tie into the
[2:00:06]
Lausanne board direction to
[2:00:07]
prioritize the intercity rail
[2:00:09]
service expansion that I will
[2:00:11]
get into. The first is really
[2:00:13]
in the JULY time frame. The
[2:00:15]
Lausanne Agency, as Aaron had
[2:00:17]
mentioned, had learned that Up
[2:00:19]
would require a completely new
[2:00:20]
operating agreement between the
[2:00:23]
Lausanne Agency and up and up
[2:00:25]
to identify Metrolink as an
[2:00:27]
alternative operator. This
[2:00:28]
requirement became necessary
[2:00:30]
for Union Pacific because
[2:00:32]
Metrolink transitioned from
[2:00:33]
contracting directly their
[2:00:35]
operations, with Amtrak over to
[2:00:37]
Alstom. Up also communicated,
[2:00:38]
as Erin had mentioned, that
[2:00:39]
given their resources being
[2:00:41]
fully dedicated to their work
[2:00:43]
on their national merger, that
[2:00:44]
as soon as they could provide a
[2:00:46]
draft agreement for us to
[2:00:48]
review would be q1 of 2026. And
[2:00:50]
of course, once received that
[2:00:52]
draft agreement, we would need
[2:00:54]
to that agreement would need to
[2:00:55]
be reviewed and negotiated,
[2:00:57]
which really made the timing of
[2:00:59]
the Metrolink subcontract
[2:01:01]
really time uncertain. So the
[2:01:03]
second major event was really
[2:01:06]
the clarity around equipment
[2:01:08]
availability. Equipment
[2:01:09]
availability has been one of
[2:01:10]
the primary constraints for the
[2:01:12]
Lausanne Agency to be able to
[2:01:13]
implement additional service
[2:01:15]
north of Los Angeles, but in
[2:01:18]
late SEPTEMBER, we received a
[2:01:19]
Pre-award authority letter from
[2:01:21]
the Federal Railroad
[2:01:23]
Administration committing to
[2:01:24]
$27 million in a Restoration
[2:01:26]
and Enhancement Grant award to
[2:01:29]
the Lausanne Agency to support
[2:01:31]
intercity rail service
[2:01:32]
restoration. And I'm proud to
[2:01:35]
say that this is the first
[2:01:36]
federal grant awarded to the
[2:01:38]
Lausanne Agency, and it
[2:01:39]
supports the full restoration
[2:01:42]
of pre-covid service levels by
[2:01:44]
restoring the 11th, 12th and
[2:01:46]
13th round trips between la and
[2:01:48]
San Diego. We were running 13
[2:01:51]
round trips pre-covid, and I'm
[2:01:52]
pleased to share that we have
[2:01:54]
already implemented the 11th
[2:01:56]
and 12th round trips and just
[2:01:57]
announced this week our plans
[2:01:59]
for the implementation of the
[2:02:01]
13th round trip between la and
[2:02:04]
San Diego starting JANUARY 26th.
[2:02:06]
So to support this service
[2:02:07]
restoration, Caltrans and the
[2:02:11]
three California Jpas agreed on
[2:02:13]
a redeployment plan to be able
[2:02:15]
to redeploy equipment from the
[2:02:17]
Northern California fleet down
[2:02:18]
to the Lausanne Agency to be
[2:02:21]
ready for service restoration.
[2:02:22]
This equipment that is needed
[2:02:24]
for our service restoration for
[2:02:26]
the 13th round trip will also
[2:02:28]
provide sufficient capacity to
[2:02:29]
allow for service expansion in
[2:02:31]
the North. So with these
[2:02:33]
developments back in NOVEMBER,
[2:02:35]
the Lausanne Agency Board
[2:02:36]
directed staff to prioritize
[2:02:39]
efforts to pursue the Pacific
[2:02:41]
Surfliner service expansion,
[2:02:42]
including the six round trip to
[2:02:43]
Goleta and the third round trip
[2:02:45]
to San Luis Obispo as the
[2:02:47]
pathway to provide additional
[2:02:50]
service. So I know Aaron will
[2:02:51]
dive into a little bit more of
[2:02:53]
the details on the next slide.
[2:02:54]
As far as the expanded service
[2:02:56]
pilot proposal itself, however,
[2:02:58]
I did want to mention that we
[2:02:59]
do view this as a great
[2:03:01]
opportunity to advance State
[2:03:03]
Rail plan goals, maximize the
[2:03:05]
investment the state has made
[2:03:07]
in the U.P. Owned territory,
[2:03:08]
provide not only greater
[2:03:10]
regional benefits, regional
[2:03:12]
rail benefits by providing peak
[2:03:14]
period service to Ventura and
[2:03:16]
Santa Barbara, but also
[2:03:17]
expanding service along the
[2:03:20]
entire corridor with a midday
[2:03:21]
departure southbound from San
[2:03:24]
Luis Obispo just after the 12
[2:03:26]
P.M. Slot. This will also
[2:03:28]
provide additional rail service
[2:03:30]
options for the World Cup
[2:03:32]
coming up very soon. And so we
[2:03:35]
are proposing a 12 month pilot
[2:03:37]
utilizing temporary funding
[2:03:39]
from both Vctc and sb cag, as
[2:03:42]
well as a portion of Lausanne
[2:03:43]
Agency's estimated operational
[2:03:45]
budget savings. To fund this
[2:03:47]
pilot, the Lausanne Agency
[2:03:48]
intends to continue to include
[2:03:50]
the proposed service in our
[2:03:51]
annual business plan and
[2:03:54]
funding request to the state.
[2:03:57]
However, given the state's
[2:03:59]
outlook on the the next budget
[2:04:01]
proposal, we will also be
[2:04:03]
working with stakeholders to
[2:04:05]
identify and pursue any federal
[2:04:07]
funding sources or any other
[2:04:08]
funding sources that MAY be
[2:04:10]
able to sustain the service
[2:04:12]
after the 12 month period. So
[2:04:13]
we're going to be taking the
[2:04:15]
lead on on doing that to make
[2:04:16]
sure that we can identify
[2:04:18]
funding to be able to sustain
[2:04:20]
this service beyond the 12
[2:04:22]
months. So now I will hand it
[2:04:24]
back over to Aaron to provide a
[2:04:26]
little bit more details on the
[2:04:27]
Amtrak Pacific Surfliner
[2:04:29]
service proposal itself, as
[2:04:31]
well as as it relates to
[2:04:37]
Metrolink's proposal. Jason.
[2:04:40]
All right. So much of the
[2:04:41]
proposal by Lausanne is
[2:04:43]
actually quite like what we've
[2:04:44]
seen from Metrolink already.
[2:04:46]
And in fact, the timetable
[2:04:48]
northbound is nearly identical
[2:04:49]
to what was previously
[2:04:50]
presented to the board. And
[2:04:53]
I'll show that in just a moment.
[2:04:54]
So specifically, the train will
[2:04:56]
travel north from La Union
[2:04:58]
Station through the area of
[2:04:59]
Ventura County and into Santa
[2:05:00]
Barbara County, getting to
[2:05:02]
Goleta at approximately the
[2:05:03]
same time. From there, it'll
[2:05:05]
continue north into San Luis
[2:05:06]
Obispo. And as Jason mentioned,
[2:05:08]
we'll return south, providing a
[2:05:10]
corridor wide train. There are
[2:05:11]
cost savings associated with
[2:05:13]
this proposal that were not
[2:05:14]
previously available under the
[2:05:15]
Metrolink, and that is
[2:05:16]
specifically because we're able
[2:05:18]
to help we're able to leverage
[2:05:20]
Lausanne's buying power and and
[2:05:21]
ability to work with Amtrak,
[2:05:23]
but also that their r&d grant,
[2:05:25]
this federal grant that they
[2:05:26]
received, we're able to
[2:05:27]
leverage that with the advent
[2:05:29]
of the additional train
[2:05:30]
equipment. So there's some
[2:05:30]
significant cost savings that
[2:05:33]
are coming, not to mention the
[2:05:34]
increase in passenger fare
[2:05:36]
revenue that's anticipated for,
[2:05:38]
in particular, that southbound
[2:05:39]
train that is a bit more
[2:05:40]
productive, as it will head
[2:05:42]
from all the way from San Luis
[2:05:44]
Obispo to San Diego. So there's
[2:05:45]
additional fare revenues or
[2:05:46]
operating revenues that will be
[2:05:47]
borne as a result of this
[2:05:49]
additional service. And then
[2:05:51]
lastly, as a as a buyer of
[2:05:52]
services from Metrolink
[2:05:54]
separate from their existing
[2:05:56]
jpa, both Vctc and sb, cag
[2:05:58]
would have to wholly fund their
[2:05:59]
entire cost of the project,
[2:06:01]
which would include their
[2:06:02]
self-insured retention policy,
[2:06:05]
which was a significant cost
[2:06:06]
associated with the service.
[2:06:08]
Approximately $5 million
[2:06:16]
self-insured retention pool would be made available if,
[2:06:17]
in fact, Metrolink were to
[2:06:18]
proceed forward, and so there's
[2:06:21]
some expedited in scheduling
[2:06:22]
that's anticipated to. As a
[2:06:25]
result, with regard to the
[2:06:26]
schedule, these are the two
[2:06:27]
trips that would be added
[2:06:29]
highlighted in yellow. You'll
[2:06:31]
notice the time into Goleta is
[2:06:33]
is close to, if not the same as
[2:06:35]
what was previously presented.
[2:06:37]
There have been some minor time
[2:06:38]
adjustments by the host
[2:06:40]
railroad in particular, which
[2:06:41]
would have been true whether or
[2:06:42]
not it was Metrolink operating
[2:06:44]
on the corridor or Lausanne.
[2:06:45]
These are the exact same trip
[2:06:46]
times that are feasible given
[2:06:48]
the existing slot. The
[2:06:50]
southbound trip, which, as
[2:06:51]
Jason mentioned, will begin
[2:06:53]
just after noon in San Luis
[2:06:54]
Obispo, will travel the whole
[2:06:56]
corridor and through Union
[2:06:58]
Station at approximately 5:50
[2:07:04]
P.M. And further south. So what
[2:07:05]
are some of the next steps? As
[2:07:07]
Jason mentioned, the the
[2:07:09]
agreement or rather the the
[2:07:11]
proposal is before sb, cag and
[2:07:12]
Vctc. Right now we're in
[2:07:14]
negotiations. The the final
[2:07:16]
draft proposal we hope to bring
[2:07:18]
back to the board in FEBRUARY.
[2:07:20]
There is the expectation that
[2:07:21]
the state's approval process
[2:07:23]
will be completed by then. We
[2:07:25]
hope that that will be positive.
[2:07:27]
But ultimately this is a state
[2:07:28]
supported service, and so they
[2:07:30]
have to sign off on any
[2:07:31]
expansion. So there is there is
[2:07:33]
that waiting period where we're
[2:07:34]
looking forward to the state's
[2:07:36]
review of this, where before we
[2:07:37]
come back to you in FEBRUARY,
[2:07:39]
we anticipate getting that that
[2:07:42]
green light following the board
[2:07:43]
approvals. We'll begin on the
[2:07:45]
concerted marketing efforts
[2:07:46]
between Ventura County and
[2:07:48]
Santa Barbara County. Largely
[2:07:49]
speaking, Ventura will work
[2:07:50]
with its residents and
[2:07:51]
constituencies in the South,
[2:07:53]
and we'll work with the
[2:07:54]
employers and the larger
[2:07:55]
organizations here in the North
[2:07:57]
to make sure that word is out
[2:07:58]
and that all of the available
[2:08:00]
riders know of the service and
[2:08:01]
are ready to use it. We also
[2:08:02]
have some additional grant
[2:08:04]
funds that were awarded to sb,
[2:08:05]
cag previously by the state
[2:08:06]
that were made available
[2:08:08]
specifically to assist with the
[2:08:09]
the ticket pricing with regard
[2:08:11]
to Amtrak Pacific Surfliner,
[2:08:12]
which will go into effect as
[2:08:14]
well. And we'll be helpful in
[2:08:15]
buying down the fares and
[2:08:17]
making costs affordable to the
[2:08:19]
riders. So I mentioned the
[2:08:20]
timeline ahead, and with that,
[2:08:22]
I'd be happy to answer any
[2:08:24]
questions. All right. Questions
[2:08:26]
from directors I see Director
[2:08:28]
Capps. And then I'll come to
[2:08:33]
Director Hartman over. Sorry
[2:08:36]
about that. Just a little cozy
[2:08:40]
down here in Goleta. Well,
[2:08:43]
thank you for this. And I just
[2:08:46]
applaud the the plan b, and
[2:08:48]
although I know our high hopes
[2:08:52]
are have been dashed, it's not
[2:08:54]
for lack of all of the work
[2:08:55]
that this agency went into. You
[2:08:57]
did everything. You lined up
[2:08:59]
the funds, the operator. And
[2:09:00]
it's really the stumbling block
[2:09:02]
that I understand has been in
[2:09:04]
place for a long time. So I
[2:09:05]
just before I ask about that.
[2:09:07]
And MR. Jewell, thanks for
[2:09:09]
being here. Welcome back to the
[2:09:12]
county. I just kind of want to
[2:09:14]
get my head around a little bit
[2:09:16]
with Union Pacific. They just
[2:09:19]
basically said we're we can't
[2:09:21]
we're too busy with our merger
[2:09:24]
to focus on this. Is that is
[2:09:26]
that the understanding? You
[2:09:28]
know, I will have to defer to a
[2:09:30]
managing director, Jewell, with
[2:09:31]
regard to the specific response
[2:09:33]
from Union Pacific. But that's
[2:09:34]
our understanding, is that they
[2:09:36]
would be able to begin working
[2:09:37]
on the agreement. Mind you,
[2:09:39]
just starting off on that
[2:09:40]
process at about this time or
[2:09:41]
sometime between now and the
[2:09:43]
end of the first quarter. And
[2:09:44]
so because they own the tracks,
[2:09:47]
they essentially control the
[2:09:48]
timeline of when this would
[2:09:52]
have gone forward. Okay. But so
[2:09:54]
again, just just trying to
[2:09:56]
clarity but because there's
[2:09:57]
already agreement with Lausanne,
[2:09:58]
it can be expanded without
[2:09:59]
having to go through all of
[2:10:02]
that process with with them.
[2:10:03]
That's my understanding. For
[2:10:04]
that, I'll defer to Jason on
[2:10:06]
the exact number of trips, and
[2:10:07]
I just want to. So the nature
[2:10:09]
of my question is just to say,
[2:10:11]
like, are we are we on a good
[2:10:13]
path here? It sounds like with
[2:10:15]
the tone of your voice is very
[2:10:16]
optimistic. But again, we we
[2:10:18]
had a lot of optimism here for
[2:10:20]
the other plan. Yeah. Through
[2:10:22]
the chair, Director Capps. Yes,
[2:10:24]
we do have, as I mentioned, our
[2:10:26]
direct access agreement with Up.
[2:10:28]
It provides us two additional
[2:10:30]
train slots on the north end of
[2:10:32]
the corridor that we have
[2:10:34]
access to. So this would
[2:10:35]
utilize one of those train
[2:10:37]
slots moving forward. We do
[2:10:39]
have plans long term,
[2:10:40]
consistent with our state rail
[2:10:42]
plan, long term goals to
[2:10:44]
fulfill that second slot and
[2:10:45]
provide an additional service
[2:10:47]
beyond the six round trip to
[2:10:48]
Goleta and third round trip to
[2:10:50]
San Luis Obispo. But to
[2:10:52]
directly answer your question,
[2:10:53]
yes, Upea has confirmed that
[2:10:55]
under our current agreement
[2:10:57]
with them, there's no other
[2:10:58]
additional amendments or
[2:11:00]
anything necessary. We have the
[2:11:02]
rights to to utilize those
[2:11:03]
slots and to utilize them as
[2:11:07]
soon as we want to. Okay, so so
[2:11:10]
no more additional funding
[2:11:12]
commitments are needed. Again,
[2:11:13]
I just you know, what the
[2:11:15]
reason, the nature of my
[2:11:16]
questions is that, you know,
[2:11:17]
we've all been dealing with the
[2:11:19]
101, all of the implications.
[2:11:20]
We don't need to go through
[2:11:22]
them. But from a computer
[2:11:23]
perspective, the impacts that
[2:11:25]
has on people's lives and also
[2:11:26]
our climate and Union Pacific
[2:11:28]
has been such an incredible
[2:11:29]
roadblock. And now here we are
[2:11:30]
with all this excitement about
[2:11:32]
this Metrolink plan and all the
[2:11:34]
work. I just want to I just
[2:11:37]
want to hear what potential
[2:11:39]
challenges lay ahead. But so
[2:11:41]
far you haven't outlined any
[2:11:42]
serious ones that this board
[2:11:44]
needs to be concerned about at
[2:11:46]
this point. Right. The only
[2:11:47]
other potential challenge as I,
[2:11:51]
as I alluded to, is future
[2:11:53]
funding. Okay. This is being
[2:11:55]
proposed between the three
[2:11:57]
stakeholders as a 12 month
[2:12:00]
pilot, really, to not only
[2:12:01]
understand the demand and the
[2:12:04]
trends and look at how the
[2:12:06]
train performs, but also
[2:12:07]
because this, as Aaron
[2:12:09]
mentioned, our intercity rail
[2:12:10]
service has historically been a
[2:12:13]
state funded program. The state
[2:12:16]
has signaled that the interest
[2:12:17]
that the state budget as a
[2:12:19]
whole, but particularly the
[2:12:21]
intercity rail budget moving
[2:12:22]
forward, they have concerns
[2:12:23]
about. So we will continue to
[2:12:25]
work with them through our
[2:12:26]
annual budget requests that we
[2:12:28]
do through our annual business
[2:12:29]
plan submittal with them, as
[2:12:30]
well as, as I mentioned, look
[2:12:32]
for other funding opportunities
[2:12:35]
that can help sustain not only
[2:12:36]
this pilot program moving on
[2:12:38]
into the future, but also our
[2:12:41]
our intercity rail program. So
[2:12:43]
the funding in the future is
[2:12:45]
always a concern of ours when
[2:12:46]
we hear about the state budget
[2:12:47]
outlook. And that's something
[2:12:49]
that we do work with the state
[2:12:51]
on, on an annual basis. So I'm
[2:12:53]
sure you're all aware of the
[2:12:57]
the governor's address for the
[2:12:59]
the governor's address and some
[2:13:01]
of the state budget concerns
[2:13:03]
that are lying ahead. So, like
[2:13:04]
I mentioned, we will continue
[2:13:06]
to work with the state on that
[2:13:08]
funding and do everything we
[2:13:11]
can to ensure not only that our
[2:13:13]
intercity rail services, our
[2:13:14]
baseline services, can be
[2:13:16]
funded, but also that this 12
[2:13:18]
month pilot program can be
[2:13:21]
sustained as well. Thank you
[2:13:23]
again. I just applaud the
[2:13:25]
tenacity and trying to just to
[2:13:27]
look for another plan when this
[2:13:29]
one, the first one that we all
[2:13:30]
voted for and we had a lot of
[2:13:32]
enthusiasm, didn't pan out and
[2:13:34]
I expressed just my frustration
[2:13:36]
towards Union Pacific for,
[2:13:38]
again, just being such a block
[2:13:39]
on something that all of us
[2:13:42]
wanted to do. So thank you.
[2:13:43]
Thank you, Director Caps,
[2:13:44]
Director Hartman, I'm just
[2:13:46]
trying to be clear in my own
[2:13:47]
mind about the number of trips.
[2:13:51]
I think you said that 11 and 12
[2:13:52]
pre-covid have been restored,
[2:13:55]
and 13 is about to come. I
[2:13:58]
heard advertisements on on the
[2:14:00]
radio today about expanded
[2:14:02]
service. And so what you're
[2:14:04]
talking about is additional.
[2:14:06]
Could you lay that out for me?
[2:14:09]
Sure. Definitely. So yes. So we
[2:14:12]
have restored our 11th and 12th
[2:14:14]
round trips between Los Angeles
[2:14:15]
and San Diego. As I mentioned,
[2:14:16]
pre-covid, we had 13 round
[2:14:19]
trips between la and San Diego,
[2:14:21]
so we restored 12 of those just
[2:14:23]
about to be 13 later this month.
[2:14:27]
So north of la, we have
[2:14:28]
historically ran five round
[2:14:30]
trips to Goleta and two to San
[2:14:32]
Luis Obispo. So this expansion
[2:14:34]
would essentially expand to six
[2:14:36]
round trips to Goleta and three
[2:14:38]
round trips to San Luis Obispo.
[2:14:40]
So the advertisement on the
[2:14:43]
radio today was San Diego to
[2:14:47]
slo. Is is what they said. So
[2:14:48]
to clarify, yes, that third
[2:14:51]
round trip to San Luis Obispo
[2:14:53]
would actually span the entire
[2:14:56]
corridor. Yeah, okay. Thank you,
[2:15:02]
Director Brown. I'd like to go.
[2:15:04]
You had mentioned the $27
[2:15:07]
million grant for equipment. Is
[2:15:08]
that for new rolling stock, or
[2:15:10]
is that rehabilitation of
[2:15:12]
existing stock and where's that
[2:15:15]
stock coming from? Yeah. And to
[2:15:17]
clarify the $27 million grant
[2:15:18]
award, the federal Fra
[2:15:20]
Restoration Enhancement Grant
[2:15:21]
award, it's actually
[2:15:23]
specifically for operations. So
[2:15:24]
unfortunately not for capital,
[2:15:26]
only for operations, and
[2:15:28]
specifically only to restore
[2:15:30]
our pre-covid service levels.
[2:15:32]
So it cannot be used for any
[2:15:35]
type of expansion beyond that
[2:15:37]
baseline pre-covid service
[2:15:40]
levels, which is 13 round trips.
[2:15:41]
So that's specifically what
[2:15:44]
they approved the award for.
[2:15:45]
All right. Thank you, Director
[2:15:46]
Brown, I've got a quick
[2:15:48]
question here. I'll take chair
[2:15:49]
prerogative to ask. So the
[2:15:50]
funding that's coming from sb
[2:15:52]
cag is funding. That's part of
[2:15:54]
the South County region. I just
[2:15:55]
want to make sure I clarified
[2:15:57]
that. Yes, that's correct. It's
[2:15:59]
through the the South Coast
[2:16:01]
program, the inter-regional or
[2:16:02]
passenger rail program. All
[2:16:04]
right. So there's not any North
[2:16:05]
County funds that are going
[2:16:06]
towards this this project. Nope.
[2:16:08]
The South County funds will run
[2:16:10]
the train north to to San Luis
[2:16:12]
Obispo on the South County.
[2:16:13]
Okay. Just wanted to clarify
[2:16:18]
that. Sorry, director Silva, I
[2:16:20]
think I just so I can further
[2:16:21]
understand the timeline because
[2:16:22]
there's a lot going on there.
[2:16:24]
So just so I understand so that
[2:16:26]
we can explain it, because I
[2:16:27]
know we were all very excited
[2:16:29]
when we voted last year to
[2:16:30]
bring Metrolink to it. So we
[2:16:31]
approved Metrolink. We want to
[2:16:33]
enter into that agreement. We
[2:16:34]
knew there were some risks
[2:16:35]
involved. There was mergers and
[2:16:37]
corporate things taking place
[2:16:39]
and all that. In JULY, we
[2:16:41]
become aware that it might be
[2:16:43]
more complex, there might be
[2:16:44]
new agreements needed to be
[2:16:45]
done. And then I'm just trying
[2:16:48]
to understand that from JULY on,
[2:16:50]
was it that we were trying to
[2:16:52]
figure out how to make
[2:16:53]
Metrolink work, or were we
[2:16:55]
operating under trying to find
[2:16:57]
the most easy solution, looking
[2:16:58]
for alternatives? I'm just
[2:16:59]
trying to know what the
[2:17:01]
timeline was for the pivot and
[2:17:03]
are for the sake of clarity.
[2:17:05]
It's just I want to make sure
[2:17:06]
we're making the decision to
[2:17:07]
support the project that is
[2:17:09]
best for the commuting
[2:17:11]
experience and the the customer,
[2:17:12]
and not the most convenient one.
[2:17:14]
I just was curious if you could
[2:17:15]
elaborate the timeline of how
[2:17:16]
this all fell into place,
[2:17:18]
because I know it took a long
[2:17:20]
time to get Metrolink going. Is
[2:17:21]
this just path of least
[2:17:22]
resistance, or is this the
[2:17:23]
ideal option that we can
[2:17:26]
provide? So to the first
[2:17:27]
question, the the response from
[2:17:29]
Union Pacific in the summer was
[2:17:30]
simply that we would need a new
[2:17:32]
agreement later in the fall.
[2:17:33]
They let us know that that
[2:17:35]
timeline would be to begin
[2:17:37]
working on it sometime this
[2:17:40]
quarter. So we knew at about
[2:17:41]
mid-OCTOBER that the pivot MAY
[2:17:43]
be necessary. Los Angeles
[2:17:45]
credit went to the board, asked
[2:17:48]
for authorization to prepare an
[2:17:50]
alternative proposal and work
[2:17:51]
with the stakeholders sb, cag,
[2:17:54]
and Vctc on a potential
[2:17:56]
alternative. Later that year,
[2:17:59]
in NOVEMBER, they got the
[2:18:01]
direction to proceed with that
[2:18:03]
proposal in prioritize it over
[2:18:05]
other options that might be
[2:18:07]
coming. With regard to the
[2:18:09]
convenience factor, I mean,
[2:18:10]
ultimately, Union Pacific is
[2:18:12]
the track owner. And so there
[2:18:13]
is a there is a lead time
[2:18:15]
concern. No matter what we do
[2:18:16]
when it comes to working with
[2:18:18]
the host railroads. But but
[2:18:19]
specifically the agreement
[2:18:21]
previously with Metrolink was
[2:18:22]
that we would have them prepare
[2:18:24]
a startup plan, working with
[2:18:26]
the host railroads. That was
[2:18:28]
simply just a plan to prepare
[2:18:30]
operations. And that low sand,
[2:18:31]
through its work with Metrolink,
[2:18:33]
would come up with a
[2:18:34]
subcontractor or operations and
[2:18:36]
maintenance program that was
[2:18:37]
still going to be Pacific
[2:18:39]
Surfliner service, just
[2:18:41]
subcontracted with Metrolink.
[2:18:43]
So while it was a metrolink
[2:18:44]
train, the tickets were going
[2:18:46]
to be through Amtrak. The
[2:18:47]
schedule was going to be within
[2:18:49]
the Amtrak schedule of service.
[2:18:51]
And the the passenger, for all
[2:18:52]
intents and purposes, will be
[2:18:54]
getting on another Pacific
[2:18:55]
Surfliner train as it relates
[2:18:58]
to the northbound commute. So
[2:18:59]
from a rider mystique
[2:19:01]
standpoint, helping to explain
[2:19:02]
that to the riders, it's
[2:19:03]
actually a bit simpler when
[2:19:05]
you're talking about having one
[2:19:07]
type of trainer, one railroad
[2:19:09]
operator on the corridor. Add
[2:19:11]
to that that the cost is
[2:19:12]
considerably lower. We
[2:19:15]
anticipate approximately 30 to
[2:19:18]
50% less costly to sb and ctc.
[2:19:21]
The the. It's not only more
[2:19:21]
convenient both to the rider,
[2:19:23]
but potentially more efficient
[2:19:25]
for sb, cag standpoint to be
[2:19:26]
able to proceed forward should
[2:19:29]
this pilot continue. And then
[2:19:30]
my only other question is I
[2:19:32]
maybe it's because I when we
[2:19:33]
looked at the Metrolink
[2:19:35]
agreement back in the day with
[2:19:36]
the afternoon one, I believe it
[2:19:38]
was we were leaving Goleta. I
[2:19:40]
had the notes here, so we would
[2:19:42]
have left Goleta around 1035
[2:19:44]
and gotten to Union Station
[2:19:47]
about 230. And now we have the
[2:19:50]
new plan of, oh, I'm sorry, we
[2:19:51]
left 1035 and would have gone
[2:19:53]
to the station at 130. And the
[2:19:54]
new afternoon plan is we leave
[2:19:56]
Goleta at 233, and we get to
[2:19:58]
Union Station at 5:50 P.M. The
[2:19:59]
morning route. It's only about
[2:20:00]
eight minutes. Inconsequential,
[2:20:01]
really, when you think about
[2:20:02]
that. I guess it feels like
[2:20:05]
this new plan. I don't know any
[2:20:06]
commuter who's like, boy, I've
[2:20:07]
been wanting to get to Union
[2:20:10]
Station at 5:50 P.M. And so I
[2:20:11]
just was trying to understand
[2:20:14]
when we say that this is a more
[2:20:15]
beneficial route to get from
[2:20:17]
San Luis Obispo to that, it
[2:20:19]
just I don't understand what's
[2:20:20]
the market question for me, I'm
[2:20:22]
confused by the market decision
[2:20:24]
of who's the customer who needs
[2:20:25]
to get out of Goleta at 230,
[2:20:26]
because it doesn't match with
[2:20:27]
our early train route. You're
[2:20:29]
not a worker who's coming into
[2:20:30]
Goleta at 8:00, likely needing
[2:20:32]
to leave at 230. So I just
[2:20:34]
wasn't sure. Again, what's the
[2:20:35]
anticipated benefit or who's
[2:20:36]
the target market we're trying
[2:20:39]
to capture here? Certainly. So
[2:20:41]
as as the board MAY recall, in
[2:20:42]
2008, the target market and has
[2:20:44]
always been the case to try and
[2:20:45]
alleviate the congestion headed
[2:20:46]
northbound during peak hour, as
[2:20:48]
well as the southbound during
[2:20:50]
the peak hour on the south
[2:20:52]
coast. So that would be in the
[2:20:53]
afternoon going southbound. And
[2:20:54]
in fact, this additional train
[2:20:56]
from San Luis Obispo will
[2:20:57]
operate through the Santa
[2:20:59]
Barbara area in that afternoon
[2:21:01]
period. So it does add some
[2:21:03]
capacity in the afternoons as
[2:21:04]
well, which we don't presently
[2:21:06]
have. The 10:30 A.M. Southbound
[2:21:07]
trip under the Metrolink
[2:21:09]
proposal was simply to get that
[2:21:10]
train back into revenue service
[2:21:12]
in the in the Metrolink service
[2:21:13]
area. Okay, so that original
[2:21:15]
one was not the idea of having
[2:21:16]
a the original plan was not
[2:21:18]
about the benefit being getting
[2:21:20]
someone down from mid-morning
[2:21:22]
to la and back. It's really we
[2:21:23]
were just trying to get the
[2:21:25]
train back down there. And this
[2:21:26]
proposal is just saying if we
[2:21:27]
need afternoon traffic, the
[2:21:29]
idea is that there might be
[2:21:31]
people who need to get down to
[2:21:32]
la in that 230 to 5:00 benefit.
[2:21:34]
So we weren't trying to do a
[2:21:36]
round trip. This is just send
[2:21:38]
it back down and call it a day.
[2:21:39]
Precisely. And in fact, to try
[2:21:40]
and get people to Ventura
[2:21:41]
County, specifically in the
[2:21:43]
afternoon at about 330 4:00.
[2:21:45]
But between the hours of and, I
[2:21:46]
can tell you that there's a
[2:21:48]
peak hour, much like with the
[2:21:49]
the ag community, that actually
[2:21:50]
precedes what is the typical
[2:21:52]
peak hour in the South coast.
[2:21:54]
So if you look on the roads at
[2:21:55]
any given afternoon from
[2:21:56]
between 230 and say, four,
[2:21:58]
there's quite a few cars on the
[2:21:59]
road headed south. So this this
[2:22:01]
is an additional trip that
[2:22:02]
should provide benefit there as
[2:22:04]
well. Thank you. Okay. Thank
[2:22:06]
you, Director Silva. Any other
[2:22:07]
questions? Any questions on
[2:22:12]
Santa Maria for the presenters?
[2:22:13]
Yes, sir. This is Julien.
[2:22:16]
Director Julien on the
[2:22:17]
schematic in terms of time and
[2:22:20]
and the expanded route to San
[2:22:22]
Luis Obispo, it mentions Goleta
[2:22:25]
to slow. What about Guadalupe?
[2:22:26]
The train will be stopping at
[2:22:27]
all the stations, including the
[2:22:29]
Lompoc station, as well as
[2:22:31]
Guadalupe. Yes. Okay, good. All
[2:22:35]
right. Thank you. Thank you,
[2:22:36]
Director Julien. Anything else
[2:22:39]
down there or up there? Okay.
[2:22:40]
Seeing none. MADAM Clerk, do we
[2:22:42]
have any public comment on this
[2:22:43]
item? Are there any members of
[2:22:45]
the public on the zoom webinar
[2:22:46]
who wish to speak? Would you
[2:22:47]
please use the raise hand
[2:22:49]
feature and I will call upon
[2:22:50]
you. There are no paper
[2:22:51]
requests to speak forms that
[2:22:52]
were received. However, we did
[2:22:54]
receive one public comment for
[2:22:55]
this item in advance, and the
[2:22:57]
comment was uploaded online and
[2:22:58]
provided to the board. And that
[2:23:00]
comment was received from
[2:23:02]
Claudia Show, and there are no
[2:23:04]
attendees on the line who wish
[2:23:05]
to speak. All right, back to
[2:23:07]
the board. This is to receive
[2:23:09]
the presentation and direction
[2:23:11]
to Staff Director Kern. What
[2:23:12]
kind of direction are you
[2:23:14]
looking for from us? I'm hoping
[2:23:16]
that you're supportive of this
[2:23:18]
new direction, and that your
[2:23:19]
direct us to bring a operating
[2:23:20]
agreement back to the board,
[2:23:23]
hopefully in FEBRUARY. Okay. So
[2:23:25]
I'm going to ask for a motion
[2:23:27]
to receive the presentation and
[2:23:28]
request staff to bring back an
[2:23:33]
operating agreement in FEBRUARY.
[2:23:35]
I'd like to make that motion.
[2:23:37]
Second. Okay. Motion from Brody
[2:23:39]
and a second from Hartman. Also
[2:23:40]
make a comment. Yeah,
[2:23:41]
absolutely. And so any further
[2:23:43]
comment on the motion, director
[2:23:44]
Brody? Thank you. I just want
[2:23:47]
to acknowledge all the work
[2:23:49]
that was put into this by the
[2:23:54]
Scag board. Ctc. They're
[2:23:56]
working on the agreement with
[2:23:59]
them. And then how excited we
[2:24:00]
were that we thought it would
[2:24:03]
work out in OCTOBER. And I know
[2:24:06]
that there was there was
[2:24:08]
excitement from the community
[2:24:09]
as well, thinking that it was
[2:24:12]
coming back. So it was a great
[2:24:15]
pivot, as you put it. In fact,
[2:24:17]
an alternative way around this,
[2:24:20]
thing, situations changed and I
[2:24:23]
look forward to having this
[2:24:24]
happen sooner than later, as
[2:24:27]
soon as we can. Because, you
[2:24:28]
know, we have a train station
[2:24:31]
and Goleta now almost ready to
[2:24:32]
go. So we want those trains
[2:24:34]
rolling through. Thank you.
[2:24:35]
Thank you, Director Perotti,
[2:24:36]
any other comments on the
[2:24:39]
motion? Seeing none. MADAM
[2:24:40]
Clerk, will you please call the
[2:24:43]
roll director. Rousse. Director.
[2:24:46]
Perotti. Director. Patino. Hi.
[2:24:48]
Director. Mosby. By director.
[2:24:51]
Lee. Director. Lavagnino.
[2:24:54]
Director. Julian. Director.
[2:24:56]
Hartman. Director. Clerk.
[2:24:58]
Director. Capps. Director.
[2:25:01]
Brown. Vice chair. Silva and
[2:25:03]
chair. Nelson. Aye. Motion
[2:25:05]
passes unanimously. All right.
[2:25:06]
Let's keep moving this thing
[2:25:07]
along. And now we'll move to
[2:25:09]
Caltrans. Caltrans director
[2:25:11]
report from Veronica Lazara,
[2:25:14]
Caltrans branch chief. Oh,
[2:25:16]
sorry, did I skip you,
[2:25:18]
executive director, just real
[2:25:20]
quick. Absolutely. Yeah. It's
[2:25:22]
all good. It's one item I would
[2:25:24]
like to announce. I would like
[2:25:25]
to introduce our newest
[2:25:28]
employee, Naomi Compton. She
[2:25:30]
joined the agency as an account
[2:25:31]
technician with experience in
[2:25:33]
the public sector finance. And
[2:25:35]
she's back here in the back
[2:25:38]
corner. She will help us with
[2:25:40]
finance, procurement and
[2:25:41]
administrative support. She's
[2:25:42]
originally from the Houston
[2:25:43]
area and holds a master's
[2:25:44]
degree in finance and
[2:25:45]
previously worked for the
[2:25:47]
University of Houston in
[2:25:48]
supporting their accounts
[2:25:50]
payable accounting and payroll
[2:25:52]
and tax information. She said
[2:25:54]
she was drawn to sbf by its
[2:25:56]
focus on public service and the
[2:25:57]
opportunity to support projects
[2:25:58]
that improve communities, so
[2:26:00]
please join me in welcoming
[2:26:02]
Naomi to the team. So thank you.
[2:26:04]
And that concludes my report.
[2:26:06]
Welcome, Naomi. As long as
[2:26:08]
you're not an Astros fan okay.
[2:26:12]
Moving along to Caltrans now,
[2:26:15]
directors and chair Nelson
[2:26:16]
again. Veronica. Veronica, on
[2:26:18]
behalf of District Director
[2:26:21]
Scott Eads, I have a couple of
[2:26:23]
announcements this afternoon.
[2:26:26]
First, starting with the some
[2:26:28]
exciting news to start off the
[2:26:31]
new year. Really right. Hot off
[2:26:32]
the press. Wanted happy to
[2:26:34]
announce that Highway one
[2:26:37]
through Big Sur has reopened.
[2:26:39]
Actually, it opened yesterday.
[2:26:41]
That is about three months
[2:26:43]
ahead of schedule. We wanted to
[2:26:46]
extend an appreciation to local
[2:26:47]
business owners, residents and
[2:26:48]
visitors, as well as those
[2:26:51]
other agencies who were
[2:26:52]
responsible and involved in the
[2:26:55]
success of that reopening.
[2:26:56]
Second, Caltrans will host an
[2:26:58]
important public meeting next
[2:27:02]
week on JANUARY 21st from 530
[2:27:04]
to 7 P.M. At the Guadalupe City
[2:27:06]
Hall. This meeting is in
[2:27:10]
relation to the Waterloo area
[2:27:12]
projects. My team and I walk
[2:27:14]
through the city of Guadalupe
[2:27:16]
last week and provided some
[2:27:17]
information to the public, so
[2:27:19]
it was nice to hear how excited
[2:27:21]
the community is about these
[2:27:23]
future investments in the area.
[2:27:25]
And that concludes my report.
[2:27:26]
Happy to take any questions
[2:27:28]
that the board MAY have. Thank
[2:27:30]
you. Any questions for MISS
[2:27:34]
Lizama from Caltrans. Or for
[2:27:36]
Director Kern, based on the
[2:27:38]
Executive Director's report,
[2:27:38]
anything in Santa Maria either
[2:27:42]
for either party? Nothing here.
[2:27:43]
Okay. Great. Thank you. So
[2:27:45]
we'll go ahead and move on to
[2:27:47]
committee meetings. First one
[2:27:49]
up is myself and Caverns.
[2:27:51]
Caverns is plugging along.
[2:27:52]
We're looks like we're gonna
[2:27:53]
have some leadership changes on
[2:27:55]
executive director there who
[2:27:57]
just actually resigned
[2:27:58]
yesterday. So we've got some
[2:28:00]
changes ahead of us, but we're
[2:28:04]
confident that we're putting a.
[2:28:05]
Pieces in place to move the
[2:28:07]
organization forward. You know,
[2:28:08]
people know that there was a
[2:28:10]
prop for allocation to caravans,
[2:28:11]
and that's going to be an
[2:28:12]
important part of moving
[2:28:14]
caravans into the future. And
[2:28:15]
so we're we're excited about
[2:28:16]
those opportunities as well.
[2:28:18]
Expanding service, whether it's
[2:28:20]
on the 166 or anywhere else
[2:28:21]
throughout the state of
[2:28:22]
California, we are navigating
[2:28:25]
some of the changes in the
[2:28:27]
landscape around field work and
[2:28:29]
farm labor, and most of our
[2:28:31]
users are actually farm labor
[2:28:32]
contractors and h-2a workers
[2:28:33]
throughout the state of
[2:28:34]
California. And so those
[2:28:35]
changing programs are going to
[2:28:36]
impact caravans over the next
[2:28:37]
couple of years. So we're
[2:28:39]
trying to be attentive and and
[2:28:40]
look over those things as they
[2:28:43]
proceed through. So that's my
[2:28:47]
report on caravans as far as
[2:28:48]
Lausanne director Lee, I think
[2:28:50]
you had your report. I think
[2:28:54]
the report. Okay. And now one
[2:28:57]
minute reports, any brief
[2:28:58]
announcements from any of my
[2:29:00]
colleagues not seeing any down
[2:29:02]
here in Santa Barbara, any
[2:29:03]
announcements in the Santa
[2:29:07]
Maria board hearing room? None
[2:29:08]
here. Thank you. Thank you,
[2:29:10]
Director Patino. Okay, we'll go
[2:29:11]
ahead and adjourn today's
[2:29:12]
meeting. The next meeting will
[2:29:16]
be on FEBRUARY 19th, 2026, in