a bunch of stuff like the
[0:01]
battery cage, pool lights, all this
[0:03]
stuff.
[0:03]
>> Then you can sell it and take pictures
[0:05]
and show it to people so they can
[0:06]
advertise. I That's a great deal, man.
[0:08]
>> up. It comes to my house and I was like,
[0:10]
"Well, now what? Who's coming to put
[0:11]
these in?" And he's like,
[0:12]
>> "Okay. We are ready to go.
[0:16]
So
[0:17]
Okay, we'll get the
[0:19]
May 12th, 2026 2026 DRC going today at
[0:24]
10:00.
[0:26]
Um that we've got first item on the
[0:28]
agenda is a review of the proposed Taco
[0:32]
Bell building site plan
[0:35]
um that is proposed to go uh along 400
[0:38]
East
[0:39]
um there at the the Macy's
[0:42]
uh next to the Macy's grocery store
[0:45]
north of the existing Fizz building just
[0:48]
in that parking lot area right off of I
[0:50]
should say parking lot area the gravel
[0:53]
area there just between
[0:56]
uh Macy's parking lot and 400 East.
[0:58]
Uh this is a again proposed site plan.
[1:02]
DRC is the final review and approval
[1:04]
body for the site plans. It is a
[1:06]
permitted use within the commercial
[1:08]
zone.
[1:09]
Um so with that, we'll go around the DRC
[1:12]
with any comments or questions that the
[1:14]
DRC members will have. So I'm with
[1:16]
Aspen.
[1:18]
>> Will you go to page four, please?
[1:22]
We just have some questions to clarify
[1:25]
or sorry, maybe one more.
[1:27]
Um for the parking requirements, our
[1:30]
code states that it's one space per four
[1:32]
seats. So if you could provide the
[1:34]
occupancy
[1:36]
so we can ensure that you meet our par-
[1:38]
parking code, that would be very
[1:39]
helpful. And then as far as landscaping,
[1:43]
you guys have the code listed on the
[1:45]
page and you call out the dumpster
[1:48]
needing three landscape sides. Um but
[1:51]
only two of the sides. That is a
[1:53]
requirement that
[1:55]
will need to be worked out. We will also
[1:58]
need to see the detail for the trash
[2:01]
enclosure to ensure that it matches the
[2:03]
building.
[2:04]
And then
[2:06]
with the architectural renderings that
[2:09]
will require a separate review by our
[2:11]
architectural review committee.
[2:13]
Um that can be set up anytime during the
[2:16]
process. So, just let us know when you'd
[2:18]
like to do that. And then with the sign
[2:21]
permits or all the signs, they'll need a
[2:23]
separate permit. You'll just do it
[2:25]
through citizen serve just like how you
[2:27]
applied for the site plan application.
[2:30]
Um
[2:32]
just as a heads-up. Will you go I don't
[2:34]
remember what page it's on. Maybe 11 or
[2:36]
12.
[2:38]
The signs.
[2:46]
» And just so you know, these will be
[2:48]
given in red line format. So, you you're
[2:50]
more than welcome to take notes, but
[2:51]
we'll send you a red line copy.
[2:53]
>> Thank you.
[2:53]
>> So, that's available.
[2:55]
>> Appreciate that.
[2:55]
>> Uh-huh.
[2:56]
>> Yeah, I know.
[2:59]
» Um yeah, just a heads-up for the
[3:01]
monument sign. That pole will have to be
[3:04]
concealed in like a pedestal and
[3:07]
footing.
[3:08]
But, I think that's everything from
[3:10]
planning.
[3:14]
» Randy, building?
[3:15]
>> As far as the address assigned on there,
[3:16]
is that from the original plat of when
[3:18]
the
[3:19]
>> It would be, yes. Probably, yeah.
[3:21]
>> So, yeah. I think I'm good. I have
[3:23]
nothing for me at this point.
[3:24]
>> Okay.
[3:26]
Jason, with public works?
[3:28]
>> Yeah, I
[3:30]
stopped by the site as part of came up
[3:32]
here.
[3:32]
>> Turn your mic on, Jason.
[3:34]
>> Please. Sorry about that. Here we go.
[3:36]
>> I can hear you anyway.
[3:38]
>> Yeah, I I stopped by the site on the way
[3:40]
up and the irrigation meters that shown
[3:42]
on the property, the one that you want
[3:43]
to use, it looks like it's in use right
[3:45]
now. I think Macy's is using that.
[3:48]
I I sent some the the meter ID numbers
[3:51]
to Joyce. She's going to look into that,
[3:53]
but I still think we can uh
[3:55]
connect on the backside of that. It's a
[3:57]
2-in meter. I
[3:59]
With your landscaping, I don't think
[4:00]
you'll need more than a 1-in line.
[4:04]
Uh and it also showed an RP on that
[4:06]
irrigation.
[4:07]
You can remove that. We don't need an RP
[4:10]
on our irrigation. If it was hooked to
[4:11]
culinary water, yes, that would be the
[4:13]
case, but our irrigation water, we don't
[4:15]
require an RP.
[4:18]
And as you noticed on the plans, you did
[4:20]
say we work with the city for the
[4:22]
culinary meter. We can Once you get to
[4:24]
that point, we'll
[4:26]
figure out where that needs to go. You
[4:28]
got a couple of options there
[4:30]
to look at that. Sewer's going to be
[4:32]
straightforward. It's just right out
[4:34]
front, so I don't see any issues with anything else.
[4:38]
>> So Jason, what I would say on that is
[4:40]
if the if that irrigation meter is in
[4:42]
place, you'll probably want to do some
[4:43]
exploration on where that stuff goes
[4:46]
after the meter. We know where it goes
[4:47]
to get to the meter, but
[4:49]
>> Yeah.
[4:49]
>> the Macy's development is relying on
[4:51]
that, you probably ought to make sure
[4:53]
that that somebody's not just going out
[4:55]
there and
[4:56]
digging up a 2-in line that goes
[4:58]
to all of their landscaping, that'd be
[5:00]
bad. The other The other thing I would
[5:02]
say is when you say the the culinary,
[5:04]
you're talking size or location of
[5:05]
connection.
[5:06]
>> Uh location of connection and placement
[5:08]
of meter.
[5:09]
>> Okay, the box.
[5:10]
>> Yeah.
[5:11]
>> Okay.
[5:11]
>> Yeah.
[5:11]
>> Cuz none of it will be in our
[5:12]
right-of-way, right? There's not really
[5:13]
a park strip or anything that's going to
[5:15]
allow for that.
[5:16]
>> Yeah.
[5:17]
>> Okay, thank you.
[5:18]
>> Uh
[5:20]
Quick question for you, Jason. Uh a few
[5:22]
that I have for you on on this if you're
[5:24]
done with your your comments.
[5:26]
>> Yeah.
[5:27]
>> Um one, they're showing a 1/2-in
[5:30]
a inch and a half copper for the service
[5:33]
line on there.
[5:35]
I mean, copper's okay, but it may be
[5:38]
better for you to do a a poly line.
[5:41]
>> use plastic.
[5:42]
>> Yeah, I'd be Yeah, I Sorry, I didn't see
[5:44]
that. Thanks for catching that. Yeah,
[5:46]
Definitely go with poly.
[5:49]
Yes.
[5:51]
>> That's going to be easier to install for
[5:53]
that whole thing.
[5:54]
Um, also, this will probably be more
[5:57]
related to the building permit once it
[5:59]
comes in.
[6:00]
But, just so you're aware of it, there
[6:03]
is going to need to be a an RP
[6:05]
check valve that's with the building.
[6:08]
And associated with that, there will be
[6:10]
required testing that will need to be
[6:11]
submitted. The the contractor who builds
[6:14]
the site will have to install that and
[6:16]
test that RP,
[6:18]
um, and provide that testing results to
[6:21]
the public works department. Um, and
[6:23]
then also
[6:26]
Sorry, continual testing,
[6:28]
uh, just throughout after the fact. Um,
[6:30]
annual testing after.
[6:31]
>> I can see it looks like where the grease
[6:33]
trap back off the back side there, is
[6:35]
that correct?
[6:36]
>> Yes, there is Yes, there's a grease trap
[6:38]
installed right, um, that'll be on that
[6:41]
back side there.
[6:42]
Yep. So.
[6:45]
Okay, anything else, Jason?
[6:47]
>> No.
[6:48]
>> That's all.
[6:48]
>> Mike, please.
[6:50]
>> Just a couple things, um
[6:53]
Are we
[6:54]
Is that North Orchard Lane, is that a
[6:56]
city road or is that private road? I
[6:58]
don't don't know what we're doing.
[7:00]
>> All All these roads within here, aside
[7:02]
from 400 East
[7:03]
>> I assume it's private, right?
[7:05]
>> Okay.
[7:06]
>> Those are private.
[7:06]
>> I was going to say, we would prefer a
[7:07]
stop sign before you enter North Orchard
[7:10]
Lane. However, we can't
[7:12]
force that because it's private
[7:14]
property.
[7:15]
>> I think there's one shown there.
[7:16]
>> Is that what that is? I couldn't tell.
[7:19]
>> Yeah, there's a stop
[7:20]
>> Okay, good. All right,
[7:22]
perfect.
[7:23]
>> There will be a
[7:25]
>> Awesome.
[7:26]
>> So, yeah, so there will be stop sign
[7:27]
here and a no entry
[7:29]
>> Okay.
[7:29]
>> sign here, no entry here, and then a
[7:31]
stop
[7:32]
um, and then a stop sign here as it goes
[7:35]
to the south.
[7:36]
>> Very cool. And then, the only other
[7:37]
thing I have, if you'll go to the
[7:38]
landscape map
[7:41]
I know we have requirements, but we've
[7:43]
dealt with this in the past. Um coming
[7:46]
out through the drive-up, that big tree
[7:48]
that your hand was just over, both of
[7:50]
those
[7:51]
are, you know, obstruct view from people
[7:53]
pulling out.
[7:56]
And I don't love that.
[7:59]
So, I don't know
[8:00]
So, basically, you look at people and
[8:02]
say, "I hate trees." Yes.
[8:05]
But we dealt with that just barely over
[8:07]
by Little Caesars and ended up tearing
[8:09]
one out because we made them put it in
[8:11]
and then made them tear it out. So, I
[8:12]
would prefer not to have that there.
[8:14]
>> Yeah, we can I say we'll add a note to
[8:16]
have it just They still have to have the
[8:18]
number of trees, but we can talk about
[8:20]
the location of those to help
[8:21]
>> They could They could pull those two and
[8:23]
put them back down towards the west
[8:25]
right on both of those potentially. That
[8:27]
would probably be better as long as
[8:29]
we're not getting
[8:30]
too close to 4th East on that one that
[8:32]
gets relocated. Maybe it follows the
[8:34]
curve. Yeah, and it goes Yeah, along
[8:36]
curve instead of
[8:38]
along what they're calling Orchard Lane.
[8:40]
We Also, please take those names off of
[8:42]
there. Those aren't 100 North and are
[8:44]
not Orchard Lane. That just confuses
[8:47]
people.
[8:47]
>> Yes.
[8:51]
» That's all I have.
[8:52]
>> Okay, sounds good.
[8:54]
>> You could even label that as just
[8:55]
private access or something like that or
[8:57]
just access.
[8:58]
That That's really what it is. It's all
[9:00]
private property with access to all the
[9:01]
buildings and everything around there.
[9:06]
» Uh fire department didn't have We didn't
[9:08]
have any issues with it.
[9:12]
» Norm?
[9:13]
>> Yeah, so I wanted to clarify. It looks
[9:15]
like two lanes going through there. Not
[9:17]
both of those are intended to be like
[9:20]
drive-thru lanes right for ordering. The one lane is like a slip lane to just
[9:24]
get people past if they need to jump out
[9:26]
and
[9:27]
go around, right? They're not
[9:28]
>> It's a bypass.
[9:29]
>> Okay, all right. That That was the only
[9:31]
question that I had on what I had sent
[9:33]
seen on the plans.
[9:37]
» Okay, with that, I'll just kind of run
[9:39]
through see if there's anything we
[9:40]
didn't cover.
[9:43]
Um
[9:44]
I'll do just
[9:46]
uh let's see. We already talked about
[9:49]
that. Just um
[9:51]
quick clarifications on on these the to
[9:54]
build on Aspen's, you know, comment
[9:56]
there the the trash enclosure does need
[9:58]
to be similar materials to the the main
[10:01]
building.
[10:02]
>> Okay, we showed what currently so if you
[10:04]
just use
[10:07]
» It could be similar to that and that
[10:08]
would be looked at with the ARC. So,
[10:10]
just make sure you include that detail
[10:13]
with it. And
[10:14]
again, this is a very prominent location
[10:17]
on that and so
[10:18]
>> Can we also ask on that one and maybe
[10:21]
even the tree placement that we're
[10:23]
talking about moving down on the curb to
[10:25]
have you add in our our sight triangle
[10:27]
requirements just in dashed or dotted
[10:29]
lines just to kind of show and make sure
[10:31]
that the first of all that dumpster and
[10:33]
then the other tree is not going to be
[10:34]
in the way of a
[10:36]
and I'm talking about coming out on the
[10:37]
4th East not necessarily internally
[10:39]
although you could do it there as well,
[10:41]
but putting a sight triangle on there
[10:42]
helps us to understand that we're not
[10:44]
going to have the visibility issues that
[10:46]
the Lieutenant Wallace that was talking
[10:48]
about.
[10:48]
>> Yeah, absolutely.
[10:49]
>> Okay, that'd be great.
[10:53]
Okay,
[10:54]
um
[10:55]
>> You can find those in our in our specs
[10:57]
by the way in our
[10:58]
>> It's in our code under title 10.
[11:00]
>> Yeah, under 10-16 standards you can find
[11:02]
those in there.
[11:06]
» Okay,
[11:08]
um
[11:09]
So, storm drain on this I recognize
[11:12]
you're tying into the existing storm
[11:14]
drain facility that's related to the
[11:16]
overall site.
[11:17]
>> Yeah.
[11:17]
>> We'll just need basically confirmation
[11:20]
that the that the existing pond that's
[11:22]
located on the east side of the the
[11:24]
Macy's building that that pond is sized
[11:27]
appropriately to be able to handle the additional volume that's going to be
[11:32]
generated.
[11:33]
Um
[11:35]
in reviewing it appears that the overall
[11:37]
site intended to have this pad be able
[11:41]
to serve into that retention pond, but
[11:43]
we'll just need the verification that pond is adequately sized to be able
[11:47]
to accommodate this additional volume.
[11:49]
>> Do you know where I might be able to get
[11:51]
a copy of the drainage study for that
[11:52]
property?
[11:53]
>> Um if the develop if the overall
[11:55]
developer doesn't have it, um
[11:58]
we should be able to provide that to you
[11:59]
as well.
[12:00]
So.
[12:02]
>> Thank you.
[12:06]
» Um and then for Randy mentioned it
[12:10]
earlier, just the grease trap. Make sure
[12:12]
you're referencing
[12:14]
uh
[12:15]
set our we do have a grease trap
[12:18]
standard within the standard
[12:19]
specifications. It's S as in Sam 5
[12:24]
uh to to be able to get that.
[12:27]
>> Thank you.
[12:28]
>> Um
[12:30]
additionally, because the
[12:33]
our our city standard requires for all
[12:35]
storm drain curb inlets to have a snout
[12:38]
on them.
[12:39]
However, because this is a private
[12:41]
system, that's not required, but it's
[12:44]
very recommended. Uh I just it'll help
[12:47]
with long-term maintenance of that
[12:49]
system um for the property owner.
[12:55]
» Thank you.
[12:57]
>> Um I believe
[13:01]
we talked about signs.
[13:06]
Uh landscaping there. Um just one
[13:09]
question that was had um
[13:13]
there's not intended to be any outdoor
[13:16]
dining associated with the site. Is that
[13:18]
correct?
[13:18]
>> Correct.
[13:19]
>> Okay. Um we've just seen some other
[13:22]
sites have afterwards have come out and
[13:24]
trucked a to picnic table outside and
[13:27]
put it on the gravel. Um that does
[13:29]
impact parking and that kind of stuff.
[13:31]
So
[13:31]
>> Yeah, Dollar Clay specifically does not
[13:34]
>> Okay.
[13:37]
Good to have cuz that will also help
[13:39]
with your parking that we talked about.
[13:41]
>> Sure, thank you.
[13:43]
>> Um
[13:44]
again, we've already talked about
[13:45]
landscaping comments. I Oh, we didn't uh
[13:49]
So, this one um maybe Aspen if you'll
[13:52]
cover that.
[13:53]
>> probably cover better than me.
[13:54]
>> Um it just is helpful if you show the
[13:57]
percentages of each material being used
[13:59]
because our code requires that uh
[14:02]
decorative material such as like crushed
[14:04]
rock can only make up 50% of the
[14:06]
landscaped area. So, you may potentially
[14:08]
need to add more live plants.
[14:11]
>> Okay.
[14:11]
Thank you.
[14:13]
>> And those don't necessarily need to be
[14:14]
trees. They can be shrubs or that kind
[14:17]
of thing. Okay, thank you.
[14:20]
Okay,
[14:21]
and I believe
[14:24]
Oh, yeah.
[14:25]
>> Yes. Uh Aspen mentioned this earlier
[14:27]
just providing a a detail of the your
[14:29]
proposed site lighting.
[14:30]
>> Okay.
[14:32]
Like the fixture detail?
[14:34]
>> Yeah.
[14:37]
Uh I already talked about the
[14:38]
requirement for ERC.
[14:41]
And I think that was it.
[14:43]
Along there, all the comments. Anything
[14:45]
else? Any other comments or questions
[14:48]
that
[14:49]
anyone had?
[14:53]
If not, I would I would look for a
[14:55]
motion.
[14:58]
So
[15:00]
>> John, I think there's enough hanging out
[15:01]
there still with the storm drain and
[15:03]
some of the other things that we've
[15:04]
talked about it's probably as
[15:06]
appropriate to table and have them bring
[15:07]
it back when it's ready.
[15:08]
>> Okay.
[15:08]
>> I'll make a motion to table at this
[15:10]
point in time.
[15:10]
>> You got a motion to table. Is there a
[15:12]
second?
[15:13]
>> Second.
[15:14]
>> Seconded by Randy.
[15:16]
Any discussion on that motion?
[15:19]
If not, all in favor, please say I.
[15:21]
>> I.
[15:22]
>> Any opposed?
[15:23]
Okay.
[15:24]
Motion passes. The application is
[15:26]
tabled. We'll get a copy of these with
[15:29]
There are a couple other comments we'll
[15:31]
add that weren't on here. We'll get
[15:33]
those added and get them sent over to
[15:34]
you
[15:36]
latest probably tomorrow.
[15:37]
And that way you've got those to work
[15:40]
um
[15:41]
If you can get these turned around and
[15:43]
into us within the
[15:45]
So, we'll have about a week time for us
[15:47]
to review it before the next DRC.
[15:50]
Um our next DRC is in 2 weeks. It'd be
[15:53]
the second So, the 26th approximately.
[15:56]
Um so, we had those a week before then,
[15:58]
we could probably get it on the next
[15:59]
DRC.
[16:01]
So.
[16:03]
Yep.
[16:05]
Okay. Uh next item on the agenda is the
[16:07]
approval of the meeting minutes from
[16:09]
April 14th.
[16:11]
If there are any comments, I'll look for
[16:12]
a motion.
[16:13]
>> Y'all know I'm making a motion that we
[16:15]
approve the minutes from DRC from April
[16:17]
14th, 2026.
[16:19]
>> Okay. Got a motion. Is there a second?
[16:21]
>> Second.
[16:21]
by Alan.
[16:23]
All in favor, please say I.
[16:25]
>> I.
[16:26]
>> Any opposed? Okay. Motion passes.
[16:30]
And if there is not anything else for
[16:32]
the DRC, I'll look for a motion to
[16:33]
adjourn.
[16:34]
>> So moved.