[0:01]
All right. Good morning everyone. This
is our regular staff meeting of Tuesday,
[0:06]
September the 8th. Call the meeting to
order. Um under announcements.
[0:14]
So on August 18th, 2026, there was a
primary ballot measure asking shall the
[0:19]
Sheridan County Senior Citizen Service
District be established.
[0:23]
And per Wyoming statute 18-15-103,
the Sharon Mort County Commissioners
[0:30]
need to enter that fact that the
election vote was in favor of
[0:33]
establishing the district. Please let
the minutes reflect this statement.
[0:39]
Moving on to warrant review and
approval. Um Ashley, anything of note
[0:43]
this morning?
>> No matter.
[0:45]
» Thank you.
Ask if there are any questions on page
[0:50]
one of six.
2
[0:58]
3
[1:01]
4
[1:05]
5
[1:10]
and six.
[1:14]
» Okay. I would look for a motion if there
are no questions on boards.
[1:20]
» Yes. I move to approve the warrants as
presented.
[1:23]
» Second.
>> Have a motion and a second. Any
[1:25]
discussion?
All those in favor, please signify by
[1:28]
saying I.
>> Those opposed? Motion carries. Move into
[1:33]
staff and elect reports. Good morning.
[1:41]
» Madam chair, members of the board.
So, uh, your planning commission met,
[1:47]
uh, last Tuesday, September 3rd. They
had three items. Uh,
[1:56]
4J ranch reszone
80acre proposal on the upper road,
[2:04]
Paradise Park, North Park. Uh they voted
to recommend the dial with that item.
[2:14]
Pegasus utility easement vacation. It
was recommended for approval
[2:19]
was simply a utility out out. We have
lots of those. So people own a couple
[2:25]
lots. They want to build across lots. So
with input from the utilities and the
[2:33]
powder group that was recommended
uh 3T Enterprises uh access easement u
[2:43]
there's a 60 foot wide access easement
that goes into their storage units up up
[2:52]
the hill here and uh they're meeting to
install some gates for security purposes
[2:58]
and that was also recommended for
approval. Um, city staff was had
[3:07]
different comments on that one. Um, the
uh utilities folks, water, etc. They
[3:15]
they were okay with it.
Fire dis I'm sorry, fire marshall, he
[3:20]
was sort of okay with it and the
planning office was not okay with it. So
[3:26]
» you have variety of comments
>> the planning commission saw bit to go in
[3:36]
I don't have the dates that you'll see
them but they'll be coming. Uh the
[3:41]
conley's uh have resubmitted an
application for a preliminary plat on
[3:48]
off of high road that I consider
earlier. They've uh dropped a lot.
[3:55]
They're down to six lots and uh no
variance request for this one. So, we'll
[4:01]
see how that goes. So, it'll be a while
before you see that one, probably
[4:05]
December likely. So, um
the uh joint planning area update uh
[4:13]
project uh kickoff meeting was last
Friday. uh
[4:18]
uh reviewed the uh project scope,
schedule, budget, etc. Um clarified uh
[4:26]
consult the client roles and uh talk a
bit about communication engagements
[4:32]
strategies.
We may be looking at a advisory
[4:36]
committee where folks would appoint
folks to to be on that from from the
[4:41]
citizens
as well as the city would likely appoint
[4:46]
people to that as well. So haven't
settled on that strategy yet, but I
[4:52]
wouldn't be surprised we do that. So
anyway, about it.
[4:57]
» Any questions for Mark?
>> Thank you.
[5:03]
Coco
[5:09]
morning county engineer just a couple
FYI things. Uh we have a road and bridge
[5:17]
mechanic or mechanic turned into
resation. So we're looking for
[5:23]
» Yeah, Ryan was good. Yeah, he was a good
but took employment other places.
[5:29]
Uh we got our nationwide permits from
the core 13 and 27 for the clean burn
[5:35]
project. So it's out advertised for
we're advertising I think first
[5:38]
advertising the paper today for about
three beats. I think we bids October
[5:44]
10th or there
so
[5:49]
uh road bridge is out doing some more
graveling. went to spot growling last
[5:53]
week and then they're I think they're
graveling on road on the east end of
[5:57]
road this week. So
that's that's about all
[6:02]
» questions for Madam Chair.
>> Yeah.
[6:05]
» Um Ken, I know we talked about this uh
not too long ago, but at some point in
[6:09]
the near future, could we kind of get an
update on uh the Willow Avenue area?
[6:13]
» Sure. Yeah, we're still kind of
wrestling with that narrow rightway on
[6:18]
that north end, but we should have
something maybe the recommendation
[6:23]
maybe. What do you guys want to do go
going forward? But that two blocks, it's
[6:28]
the counties.
[6:32]
» People are getting through there using
it quite a bit. Pretty a lot of people
[6:37]
using it,
>> but we haven't fixed any of the drainage
[6:42]
issues.
>> Yeah. Right. Right. Okay.
[6:46]
» Any other questions?
>> Madam Chair, I just I uh went through
[6:50]
Key Tone Road last night um and and just
like to let the road bridge know that
[6:55]
both ends where they did the work on
that. It's way better than it was.
[6:59]
Obviously, we're not going to go all the
way through there, but but the the both
[7:03]
ends where they rebuilt the road and
regraveled it, big improvement. probably
[7:09]
people will get quite a bit farther
before they get stuck.
[7:14]
» But uh
>> yeah, double-edged sword.
[7:17]
» Yeah. Yeah. But it is it is a nice
improvement on both ends.
[7:23]
» I'll pass it along.
>> Thank you.
[7:26]
» Thank you, Ken. Um Ashley, anything else
for us this time?
[7:32]
Diana? Nope. For later. Okay. Jesse.
>> No, Madam Chair.
[7:36]
» Robert,
[7:45]
» morning. Robert Gail, Shering County
Airport Manager. Um, just wanted to
[7:49]
provide the board uh with an update on
conversations with Sky West in regard to
[7:54]
capacity. We've uh it's definitely been
a a conversation for quite a while and
[8:00]
dove back into it here recently. And I I
guess just to provide a recap um in
[8:06]
March we took a look at projections um
where we were sitting and with the uh
[8:11]
theou we hold with the state we did have
that amendment updating those numbers um
[8:16]
we were able to lower the contract m
maximum substantially was just how we
[8:21]
were performing and um essentially
that's that's how we budgeted for air
[8:27]
service based off that contract maximum
and I think we did have a little bit
[8:30]
extra in there this here just with that
avenue hadn't been signed by the
[8:34]
attorney general's office yet and we
have rising fuel costs. So, um that's
[8:40]
how we had things budgeted. Um this
summer we've performed great. Um and
[8:47]
here recently revisited that with Sky
West and um took another look at their
[8:52]
projections and um they've they've
basically got that contract maximum
[8:58]
close to a third of what we even had in
March. um so we've discussed looking at
[9:04]
um adding an aircraft.
>> Um
[9:09]
let them know that uh appetite for
budgeting anything further probably
[9:13]
wouldn't be there and I think the state
agreed on their end as well too. Um but
[9:18]
with where those contract maximums are
are at they feel like they can add
[9:23]
capacity and with how we're performing.
Um, also with that, uh, with
[9:28]
efficiencies gained and the economies of
scale, bringing more aircraft into here,
[9:32]
um, we also discussed dropping the
blockout rate back, fixed cost by about
[9:36]
1.75%.
So they bring more aircraft in here,
[9:39]
it's going to be a little cheaper per
flight hour. Um, so what I'd like to
[9:44]
recommend is moving forward to um an
additional four flights a week starting
[9:50]
in January
and then um towards that peak season uh
[9:55]
beginning of that peak season in May,
June, bumping up to three flights daily.
[9:59]
Um Sky West fully thinks we can support
it and it's not going to affect what's
[10:04]
budgeted. Um anything past that contract
maximum Sky West picks up. Um,
[10:13]
so I don't know if there needs to be
formal action taken or if that's just an
[10:16]
administrative decision and you guys are
good with me just reaching out to Sky
[10:19]
West, but that's that's what I would
recommend doing. Um, it's there's
[10:23]
there's not any risk there.
>> And I I don't think Clint unless since
[10:27]
the change in the budget, it would be
administrative. Um,
[10:31]
» an extra flight's fantastic.
>> Outstanding.
[10:35]
» Great news. I think we've certainly been
patient on building this up and we're at
[10:39]
a point where yeah, we can definitely
add that in and uh it's not going to
[10:43]
change what we've what we've had
planned.
[10:45]
» Okay, any questions for Robert?
>> Great.
[10:51]
» And then uh another item that I wanted
to touch on was um
[10:56]
proposals um or or discuss uh looking at
proposals that kind of go outside of
[11:01]
what we have defined as far as leasing.
Um, right now we have our business park,
[11:07]
the executive hangers area. Um, we've
got those incorporated, the leasing
[11:11]
rules, and occasionally I I get a
proposal tossed out or an idea tossed
[11:16]
out on something that kind of goes
outside of that. Um, I had one come up
[11:20]
here recently and now um, looks like the
party really wants to move forward with
[11:24]
doing something that's kind of outside
of those leasing rules and essentially
[11:28]
be north of where the executive hanger
area is at. Um,
[11:35]
long term or in our master plan and that
would be like an executive hanger phase
[11:38]
2 area. Um got that identified but
there's no record of survey. There's no
[11:44]
infrastructure there, electric, water,
sewer, gas, roadway. Um but I got
[11:50]
somebody that wants to build there and
they're willing to take that
[11:53]
infrastructure to that area um
just with uh kind of negotiating on um
[12:00]
maybe I would say more favorable leasing
terms. um doing a 40-year agreement and
[12:06]
um calling it kind of undeveloped land
since there is no infrastructure there.
[12:11]
So doing a little bit of a lower ground
lease rate
[12:14]
certainly works out well for both
parties because getting that
[12:17]
infrastructure there is expensive for
the airport. So if they're willing to do
[12:20]
it on their own dime that's great. Um,
I think our leasing rules have really
[12:27]
covered a good transparent way to to uh
for everybody to view these proposals.
[12:34]
So, I I guess we don't really have
something like that to define if we want
[12:37]
to move forward other than I was
thinking maybe we asked this party to
[12:41]
give us a formal proposal and we still
could um publish it online, publish it
[12:47]
in the in the paper and hold a public
hearing so anybody could comment on it
[12:50]
if they wanted to. Um I don't know if
there's any thoughts on feelings on that
[12:56]
but um I could certainly see moving
forward with this project.
[13:00]
» So Madam Chair, so how far north is it?
Just across the taxi way there up to
[13:05]
Airport Road or is it further west and
north on that more undeveloped stuff?
[13:10]
» So we we kind of have that developed
area that's further south. They've got
[13:14]
the Sheridan Pilots hanger. Then we've
got some county um box hangers. They
[13:19]
just want to go north of that. So
they're okay.
[13:22]
» Yeah. So they want to extend.
>> Okay. I thought it was north of Big Horn
[13:25]
Airways building is where
>> it's kind of out in that stretch, but
[13:30]
still um
>> getting all that infrastructure extended
[13:33]
to start developing that area is quite
costly and they're willing to do it. So
[13:38]
» Okay. Yeah. I'd say we to see a formal
proposal.
[13:42]
And then Robert, um,
>> it's been a busy summer, but I was
[13:48]
curious, has the committee met? We had
that committee that was looking at the
[13:54]
agreements,
>> the kind of had to put those on hold if
[13:58]
we, you know, with
>> we came pretty short staff this winter
[14:03]
and all the projects came off. I just
haven't
[14:06]
» Well, the FAA here and Yeah. Yeah.
>> Yeah. Okay. So, it's certainly on the
[14:10]
radar, but it's something we had to jump
back to yet.
[14:13]
» Okay.
>> And then just wanted to let you guys
[14:16]
know I'll be attending the airline
rendevous in Jacksonville um leaving
[14:20]
town uh tomorrow midday. They'll be out
of the office the rest of the week. And
[14:26]
then I also know you guys received a
letter on offering additional services
[14:30]
up the airport. That's something I just
haven't been able to digest yet or
[14:34]
unravel yet to hear. So, believe you
guys got a letter.
[14:39]
That's all I got.
>> Okay. Any questions for Robert?
[14:43]
» Appreciate the updates. Safe travels.
>> Amy,
[14:48]
good morning. Good morning.
[14:58]
» Hey, good chair. Morning commissioners.
Uh Amy Long, library director.
[15:06]
uh have a couple of announcements for
you this morning. You do have a handout
[15:11]
that I also emailed out. I did catch one
correction that I will correct and email
[15:17]
this morning. Uh the Bulmer Branch
Library is going to be closing for a
[15:23]
short period of time in order to
uh collapse the timeline for the
[15:29]
renovations. Um, this is driven by the
deadlines for the reimbursement grant
[15:35]
that we're receiving through the state
library. Uh, the grant is the Wyoming
[15:41]
library multi-purpose community facility
program subgrant. Uh, which is why you
[15:46]
have it in your handout. Um, just to
give you the dates, they're up at the
[15:50]
top of your handout. So, the key dates
for the closure are September 19th
[15:55]
through 26th. It will be a full closure
where we pause all services. And this is
[16:00]
because we have to pull all of the books
off of the shelves in the fiction
[16:04]
section, move the shelving into the
children's area, and then put all of the
[16:09]
books back up because we would like to
keep as much of the collection available
[16:13]
and circulating as possible, and they
have to be in order. Um, and then we
[16:18]
will reopen for limited services. um
opening the youth services desk as our
[16:24]
main circulation point. Um those
services will be very similar to what we
[16:29]
had available during COVID which was
holds pickup ill account services
[16:34]
checking in and out um as much as we
can. We'll be fetching books both from
[16:39]
the inner circle which is uh the
non-fiction collection that's still
[16:42]
available um that staff have been
fetching so far as well as the fiction
[16:46]
and children's collections. Um and then
uh November 9th through 13th once the
[16:54]
renovations are completed in the adult
colle in the adult section, we will uh
[16:59]
put up all the shelves, get all of the
collection back on the shelves. Um so
[17:03]
we'll be fully closed during that
portion so we can concentrate on that
[17:07]
and then we'll reopen to full services
with a fully renovated Fulmer Library on
[17:12]
November 16th. Um then after that uh I
don't have the exact date uh to start
[17:19]
yet because that depends on the
subcontractor schedule for starting the
[17:23]
slab work in the Wyoming room but then
the Wyoming room renovation would begin.
[17:28]
Um the Wyoming room portion of the
renovation is separate from the grant
[17:32]
and so it can start after the grant
deadlines are finished. Um, and that was
[17:39]
uh the one correction I saw under grant
information details. Bullet three, the
[17:45]
award for 1.75 million was secured for
all four branches. Um, and their library
[17:51]
renovations. It was library specific,
which is why the Wyoming room was not
[17:55]
included. That's an archive. It has a
different kind of purpose than a
[17:59]
library, so it didn't qualify for the
grant. Um
[18:04]
uh additionally
uh you might be wondering what about the
[18:08]
elevator? We have been in contact with
the technician uh that serves the whole
[18:12]
region,
the only technician that serves the
[18:16]
whole region of our particular elevator.
Um and we are trying to get them
[18:20]
scheduled during this closure period so
that hopefully we reopen with a
[18:24]
functioning elevator as well. Um,
additionally, this document is hopefully
[18:31]
also going to serve for anyone who's
answering the phones of the county in
[18:35]
case you guys get questions. It provides
phone numbers for specific um questions
[18:42]
around accounts or events and people
they can contact via email or phone
[18:47]
number so that they can get right to the
person that they might need to answer
[18:51]
their question. as well as some
frequently asked questions um pointing
[18:55]
them to a a very quick script that they
could answer. Um and so that is on the
[19:02]
closure. Additionally, Story is the only
small branch that had an issue with the
[19:07]
renovation. We are at we have fixed the
issue with the lighting and the ceiling.
[19:14]
Um and we are hoping to do the
substantial completion walk this week.
[19:17]
It hasn't been scheduled yet, but it
should happen this week with Arette at
[19:21]
Odell. Um, and so they should be knocked
on Laminate. Um, it should be open next
[19:30]
week. Um, they do have their furniture.
It has been in top offic's um, warehouse
[19:35]
and so that should also arrive as soon
as we do the substantial completion. So
[19:40]
that story would be open and
operational. They have been operating
[19:43]
out of their other spaces. Um and the
other two smaller branches have had
[19:48]
their furniture and have been operating.
Um and they would not be impacted by
[19:52]
this closure. Also, homebound delivery
would not be impacted by this closure.
[19:57]
Um and so that is the Fulmer closure.
The other announcement I just wanted to
[20:03]
make is that our part-time employee um
out in Claremont, we were just about to
[20:08]
open for our additional hours, but um
that person did need to resign due to an
[20:14]
unforeseen um issue that that is
perfectly reasonable um reason for that.
[20:20]
Um so I will have to repost that
position, but they did provide really
[20:24]
great feedback on the hours and schedule
and so I think we'll get a lot more
[20:28]
tapers based on their feedback. So, we
will be posting that in their newsletter
[20:32]
and in the branch and during this
closure will be a great opportunity to
[20:36]
get that position filled and um try to
extend those hours again hopefully in
[20:41]
October. Um also uh my administrative
assistant accepted a position
[20:47]
internally. So, I will be hiring a
part-time administrative assistant in
[20:51]
Fulmer also during this time. So, uh
just to let you know those were also
[20:56]
happening. Any questions?
Yeah. Any questions for Amy? Appreciate
[21:01]
the updates. Yeah.
No, no, no questions. Thank you.
[21:06]
» Thanks for being here this morning.
Absolutely. Thank you.
[21:09]
» Good luck with all the construction.
[21:13]
» All right. Uh Eric,
[21:25]
Eric, maintenance. Uh just giving you
guys a heads up. We did have a crew
[21:30]
member here but in his for his
retirement at the end of the month. So
[21:35]
we are advertising for that replacement.
>> Any questions for
[21:43]
» thanks for the hit that appreciate it.
[21:50]
Kelly.
[22:06]
» Good morning, Madam Chair,
Commissioners. Levi Demia, Shar Sheriff.
[22:10]
Um, just to give you a heads up as well,
we had a a control operator who had to
[22:14]
leave uh move back to uh out of state
for family reasons. So, we'll be
[22:19]
advertising for a position for that for
a control room operator. And we had a
[22:24]
detention deputy after 15 years of being
with the sheriff's office. She's been
[22:28]
working very hard to get her counseling
license and and was able to do that,
[22:34]
finish all of that about a year ago, has
been kind of doing some part-time work
[22:37]
and she's to the point where she's going
to go do that full-time and so she has
[22:41]
uh moved on to do that. So, we'll be um
advertising for a position for that as
[22:45]
well. So,
>> congrats to her. Yeah, that's great. Any
[22:49]
questions for Sheriff?
Okay, thanks Lee. I appreciate it. Quit
[22:56]
chamber.
>> Madam chair, commissioners. Um, just a
[23:00]
heads up. I'll be up on Thursday and
then next week the auditors will be in
[23:04]
building on
[23:08]
Jennings. Um, I've got some family
coming in this week, so I'll be in and
[23:12]
out.
>> Mr. Rzy,
[23:15]
» it's just going to be a busy day today.
Three meetings, so I'll be out. Yeah,
[23:23]
» I'll be out Thursday. Have to take my
wife to Billings for a medical
[23:27]
appointment.
>> Okay.
[23:28]
» Other than that, I'm around.
>> Mr. Right.
[23:30]
» Nothing at the moment.
>> I don't have anything either. We will
[23:35]
move on to item five. Consider a word of
a bid for the design build addition and
[23:40]
renovation of the public defending
building. Call on Cameron Deministrative
[23:44]
director.
>> Commissioners. Um we opened up the bit
[23:49]
for this um building. It's the building
right in the north of the county
[23:55]
attorney's office. Um
it was designed uh to go out for the
[24:01]
public defender office space. Um we
received five bids. Um just for the
[24:06]
record, I'm just going to read off those
uh totals. And it's this is in the order
[24:12]
that they were received, not in the
order of any other reason. FDL
[24:17]
Consulting LLC with Odell Construction
was 59,550.
[24:22]
Roadhouse um construction with Ironsburg
architecture was 112,400.
[24:29]
Dick Anderson construction with the
Evolve Architecture was 110,363.
[24:35]
venue in construction with the rent
design group was $110,919.50
[24:43]
and in your app construction with QC10
architects was 49,100.
[24:51]
Um there were some other add-ons in a
few of these bids for uh geotechnical
[24:57]
reports and asbestous and topography. I
put that up and um put them on as as
[25:03]
needed. But at this point the the goal
was we had to have a design. Um we have
[25:09]
to go ahead and our goal was to add
space um about 800 so square feet to the
[25:16]
south side of that building. And a lot
of the cost of this is just the design
[25:22]
construction. This does not include any
of the actual removal. So not single
[25:27]
mail going into it. Um if we go ahead
and expand out uh just be prepared that
[25:34]
uh the city and with code we will have
to update the older section of the
[25:39]
building. So at this point I'm not
necessarily going to I didn't submit a
[25:43]
memo and saying which one um I would go
with but there is quite a discrepancy in
[25:49]
the bids. Uh they were all consistent in
the sense they covered every aspect that
[25:56]
I requested. Um, so this isn't about
quality of submissions. This is really
[26:03]
just passing on to you. You've had a
chance to look at the documents. So I'll
[26:07]
just stand for any questions at this
time.
[26:11]
» Any questions for Cameron? Um, Cameron,
I know we talked about kind of that
[26:17]
increased cost of construction because
we need to get it up to code and there
[26:22]
had been recommendations from some of
the contractors it sounds like about
[26:28]
just dozing it, starting from scratch.
Um,
[26:34]
I I guess I would just open it up for
that conversation. Um, I feel like Well,
[26:39]
I'll just open that up.
>> I don't care. Yes, there there was a
[26:43]
question multiple questions raised
during the pre-bid meeting.
[26:48]
» Um if you looked at the existing
building as it is right now, it was
[26:53]
built in seconds and so there is some
slope to it. If you're trying to add on,
[27:00]
let's say
ft of brand new construction, you have
[27:06]
to bring the other side up to code as
well.
[27:09]
There was a lot of um I guess concern
and for each of them they they said yeah
[27:15]
the easiest way is to tear down the
other and just put up what you want. So
[27:20]
right now it's about 1,100 square feet.
If you add 800 that's 1,900. So
[27:25]
remodeling the old couldn't cost as much
as tearing down and starting from
[27:29]
scratch on a blank slate. So that was
comments that were received by bidtors.
[27:36]
» So
I'm just having
[27:40]
perfect world. Would we ever want more
than 1,900 square feet? Would
[27:46]
would this change
or would that be a bare minimum? Would
[27:51]
we outgrow that in five years?
>> Madam Chair, um if you look at just the
[27:57]
attorney's office next door, there's two
floors. So if you look at other
[28:00]
buildings, there's multiple floors. If
you are going to say in 5 years, oh, we
[28:07]
we want to increase this, then you just
wasted the money to build it at,900 ft.
[28:13]
If your goal is to do a two level right
from the start, then you probably should
[28:18]
do a two floors right from the start,
>> right?
[28:22]
But for right now in the public
defenders space, um, with the number of
[28:29]
staff they have,
they could fit. Um, but I'm not saying
[28:35]
what society is doing, but the sheer
volume of increases at case loads.
[28:42]
» Yeah, I could see the state adding more
staff in the future.
[28:50]
comments, questions,
>> Madam Chair.
[28:53]
» Yeah, Commissioner.
>> At the risk of being blunt, I'm not for
[28:56]
any of these.
[29:01]
» Okay. And why? Can you follow up with
that, Commissioner Ray, for me?
[29:06]
» I can follow.
>> What's your thinking? I'm I'm I'm
[29:09]
thinking that we uh
know Eric under the bus, but I'm
[29:14]
thinking internally we put fresh coats
of paint, we clean, we maybe put new
[29:21]
flooring down, we spruce it up, and we
try to work internally to make it a
[29:28]
usable space. Not necessarily for the
public defender, but we move people
[29:34]
around to get people where they have
enough room, whether it is another
[29:41]
department that moves over there and
then public defenders move into their
[29:45]
space.
>> But the idea of spending
[29:49]
north of half a million dollars to
I mean all these numbers are just for
[29:55]
design, right?
The actual construction,
[30:01]
I'm guessing, is going to be half a
million at least. So, I'm not in favor
[30:05]
of doing any of
any of that. I think we need to work
[30:09]
with what we have just to be
conservative with our funds.
[30:14]
» Okay.
>> Moments. Yeah.
[30:18]
» Um, you know, it appears to me
statutoily we're required to provide an
[30:23]
office for the public defenders.
certainly doesn't say that it has to be
[30:27]
1,900 square feet. That that facility
over there. Um I went over with Cameron
[30:34]
and Commissioner Jennings this morning
and we looked at it certainly wasn't
[30:38]
nearly as bad as I was led to believe
that it was going to be. Um and I think
[30:44]
it's it's fairly habitable with like
Commissioner Wright said, certainly it
[30:48]
needs a good cleaning. It needs some
paint. Um probably
[30:53]
different flooring put in the put in it.
Um maybe a petition put in between the
[30:59]
front entryway and the office there. It
would be a lot more minor than than the
[31:06]
amount of money that we'd be spending.
We simply I just I agree with
[31:12]
Commissioner Wright in the fact that we
didn't we didn't acquire that property
[31:17]
so that we could tear it down and spend
a half a million dollars there. So, I'm
[31:23]
in in agreement with Commissioner Wright
and and looking and that we still we
[31:28]
continue to look at all the options of
what we have for space in the courthouse
[31:33]
as opposed to space over there for like
Commissioner Wright said maybe moving
[31:37]
some people around or something of that
nature.
[31:46]
Madam Chair,
>> um, you know, I actually, uh, just like
[31:51]
Commissioner Siddle said, I was
picturing this building my mind because
[31:55]
I've only ever seen pictures. Uh,
walking in it, it really is not in as
[32:00]
bad a shape as I thought it was. And so
I I'm more for along the lines of
[32:06]
agreeing as to let's let's do a little
bit of sprucing up. Let's see what we
[32:10]
can do with it. And then maybe down the
road, you know, a year or so or five
[32:15]
years, it's if it's not working, then we
discuss something along that lines and
[32:20]
maybe we start preparing for that and
>> in 5 years or whatever, we we look
[32:27]
again.
>> I
[32:30]
I personally would uh you know, it's a
great location next to the attorney's
[32:36]
office, close to the courthouse. Um,
I'd like to think that we're designing
[32:41]
something that
fits us in 2550 years. Um, and I I don't
[32:48]
know if we have a vision of that at this
point. Um,
[32:53]
yeah.
[32:58]
Any other comments,
Cameron? Any other comments?
[33:05]
I guess my only comment manager my
comment is um
[33:11]
» these vendors put a lot of work into
this. We asked them to submit what
[33:18]
was requested. They did everything
correctly. Um but yeah, the costs are
[33:24]
going to be extensive with this. They're
not trying to sugarcoat it.
[33:29]
But if I had to recommend any of the
five could have done it. So, I just want
[33:34]
to be on the record that each of these
entities did what I asked them to do.
[33:46]
» So,
I'm I'm sensing we're not making a
[33:50]
motion for any of these today.
[33:56]
» That's my story.
[34:01]
» Quick.
Okay. Um, I guess do we we want a motion
[34:10]
to
or or I guess it's a head nod to Cameron
[34:14]
to look at costs for paint carpet.
[34:20]
» Madam Chair,
>> just to be clear, you want me to contact
[34:24]
all five and say we are not proceeding
with this project?
[34:29]
» Would we need a motion to that effect?
wouldn't have to. You're just giving
[34:34]
direction to your employee.
You could if you'd like. You know,
[34:39]
you're not prohibited from
>> that is the sense I'm getting, Cry,
[34:45]
since no one's going to speak up.
>> Thank you. And that's for um the rest
[34:52]
get you some estimates.
>> All right. Our next item is executive
[34:59]
session uh pursuant to state statute
16-4-45A3
[35:04]
matters concerning litigation. And I'd
look for a motion.
[35:08]
» Madam Chair,
>> yes.
[35:09]
» Move to convene executive session
pursuant to W statute 16-4-40583
[35:17]
concerning the litigation.
>> Second. We have a motion and a second.
[35:23]
All those in favor signify by saying I.
I
[35:26]
» opposed. Motion carries. We'll move into
executive session. Thanks, folks.
[35:41]
I'll let her get the door first. Sorry.
>> Good.
[35:46]
» All right.
>> Madam Chair, I move to reconvene into
[35:49]
regular session.
>> Second.
[35:51]
» Motion in a second. All those in favor
signify by saying I. I those opposed
[35:55]
motion carries with that we are ajourned
at 9:42