Agenda
[0:00]
DevelopingEvergreen Brick Works: Case Study, Context and Insights
[34:43]
Business Arising from Previous Minutes
[34:47]
Indigenous Engagement & Consultation Strategy Update
[41:48]
Draft 2025 Budget for The Grand Trunk Renewal Project Update
[44:13]
Grand Trunk Site Activation & Animation Updates
[50:24]
Discussion Points from the Real Estate, Legal & Finance Working Group
[1:10:09]
Reports of the Working Groups & Staff Update
[1:10:13]
Partnership
[1:11:54]
Vision, Planning & Architecture
[1:12:05]
Real Estate, Legal & Finance
[1:12:11]
Communications, Advocacy & Civic Engagement
[1:16:49]
Infrastructure & Environment
[1:20:00]
Working Group Coordinator(s)
[1:21:07]
Staff Update
[1:25:05]
Date of Next Meeting
[1:25:06]
Adjournment
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:00]
Theory of change had really been this kind of if
[0:02]
you can build awareness, if you can provide education, tools
[0:06]
and training that will lead to action or all around
[0:09]
sustainable cities. So that had been evergreen's theory of change.
[0:13]
And we took that and we applied it to the
[0:15]
site itself. And. We worked with, again, a very collaborative
[0:21]
process and brought in experts to help facilitate this with
[0:24]
us. To really say, what is it that we're fundamentally
[0:27]
trying to do? How will we create this living lab.
[0:29]
How? Does that program. Embody the heritage and the brick
[0:35]
making history of this site. And how do these themes
[0:40]
then inform the nature of the design of the program
[0:44]
that happens down there. As I mentioned, it took us
[0:47]
eight years. A long time. Some people said, oh, I
[0:52]
thought it was the best project that never happened. Because
[0:55]
we were like, sits and starts and trying to get
[0:57]
out of the starting gate and figuring things out. And
[1:03]
so we started to do some community programming, and I
[1:05]
think 2007, three years before, we hadn't even broken ground
[1:09]
for construction yet. So that we did a farmers market,
[1:13]
we did some pop up gardening and programs, and so.
[1:18]
Yes. They helped us to say, hey, what will work?
[1:21]
Will people come? But they also put us on. The
[1:23]
map. And by putting us on the map, it was
[1:26]
very strategic because it helped us to get legitimacy. With
[1:30]
the public. It helped us to show donors that we
[1:35]
were indeed a real thing. And to help open their
[1:40]
purses. And both of those things helped to move forward.
[1:43]
City approval. So, yes, the visitor programming was lovely and
[1:47]
fun, and we learned from it, but it was strategic.
[1:49]
In terms of moving the project along. And we kept
[1:52]
moving. We kept trying to create. A big, complex site
[1:56]
like yours, how do you create spaces of scale? And
[1:59]
so we would bring in smaller containers, like inexpensive activations.
[2:06]
That people could kind of find a front door. This
[2:08]
flower was like a building tenant like kind of a
[2:10]
playful gesture that sort of pops out of the site
[2:15]
and you can see it as you're going by bathey
[2:17]
and so on. We would try to mobilize champions. And
[2:20]
create buzz. Prince Charles was coming. We pulled out all
[2:25]
the stops. To. Have a whole conference and events and
[2:30]
so on. That, again helped to move approvals. Along. We
[2:36]
did light touch, and they still do this sort of
[2:38]
work down there. We did light touch. Urban ecology and
[2:42]
created some significant geological. Artistic installations that would raise awareness
[2:49]
that this is indeed in a watershed. That's a watershed.
[2:52]
Wall, that one picture there. And moving to bigger activities
[2:57]
around local food systems and urban agriculture, again, very much
[3:00]
in the realm of sustainable cities. You can see this
[3:03]
building is, in fact, not dissimilar in some ways to
[3:06]
yours just in that it's a large, hulking space. And
[3:11]
our farmers market quickly became the largest local farmers market
[3:15]
in Toronto, and it's contributed millions of dollars to the
[3:18]
local food economy. And so smaller activities to larger ones.
[3:23]
Green City camps really working with the space heritage interpretation,
[3:28]
leaving a lot of the machinery in situ, creating ways
[3:32]
of representing the worker stories. It cost a lot of
[3:36]
money to fix the brick press there, but even the
[3:39]
interactions around kind of the worker stories. And experiences. They
[3:47]
don't need to be. Hugely expensive, and they do create
[3:50]
a real tone in terms of what matters. Who's been
[3:54]
there before us. Why does this site resonate for Toronto?
[3:58]
Just different ways of trying to open those conversations and
[4:01]
then larger scale events as well. There's been many TEd
[4:05]
talks down there. This is something called singularity. Uconnse. That
[4:08]
was hosted a large scale exhibit. So we moved into
[4:12]
bigger events as well as capacity and opportunity arose. So
[4:17]
those are just some of the ways that we activated
[4:19]
the site from a community perspective, ways that reflected. What
[4:24]
was there? And also ways that drove the business plan,
[4:28]
which I'll speak about in a sec. In terms of
[4:31]
planning and approvals. It was really helpful for us to
[4:35]
think about the site as a campus. I didn't really
[4:40]
appreciate that until, well, in oopsie, many years into. The
[4:44]
site's development that there are different kind of nodes across
[4:47]
the site. There's different buildings. And each of those kind
[4:51]
of plays a different purpose. There are many phases over
[4:55]
time as the need and as the opportunity align. And
[5:00]
so we didn't have to do it all at once.
[5:03]
We hired because this site was so much about Toronto.
[5:07]
And city building of Toronto. We hired a Toronto team
[5:10]
of designers. We received proposals. From. International firms. And that
[5:18]
was unflattering. But we ended up going with. A really
[5:22]
bona fide team of experts from Toronto and again, that
[5:25]
spoke the values of what we were trying to accomplish.
[5:30]
And given the scale and capacity it needed to be
[5:32]
a very collaborative process. And so we hired an architect
[5:36]
who had that kind of disposition. We could work with
[5:41]
25 sub consultants and so on. A lot of community
[5:45]
engagement in the design and allowing the design to be
[5:47]
iterative. And echoing back, what is it about this site
[5:51]
that's important to you? What is it? About relevant? What
[5:55]
is it about the qualities and the characteristics of this
[5:57]
space that you don't? Want to be lost through the
[6:00]
design process. It's nice to do. It builds more ownership,
[6:05]
it builds more voices. And I know even with the
[6:08]
flood they had this summer, there was, like a groundswell
[6:10]
of support for people to go down and help the
[6:13]
brickworks because it has become such a beloved institution in
[6:17]
the city. So, again, these are kind of nice to
[6:20]
do. Things. But there's a bigger picture as well in
[6:24]
terms of creating champions and advocates, so just moving from
[6:28]
the green. Sorry, the community work to the green design.
[6:32]
It is a lead platinum site. We employed all sorts
[6:35]
of strategies. This was the second phase of development that
[6:39]
we did about a $25 million redevelopment of the large
[6:43]
building there. That's a 53,000 square foot former kiln building.
[6:47]
And our ambition was to create. A zero carbon. Building,
[6:52]
or rather redevelopment. And so. I included this film because
[6:58]
this slide, because it shows some of. The scale again,
[7:02]
which you have, like, a large kind of tunnel like
[7:05]
shape. And how we broke that shape into different kind
[7:07]
of zones of action of activity for different programmatic functions
[7:12]
and uses. And how the green design you can see
[7:15]
a geothermal field was as part of that. So looking
[7:19]
at the site and the building. In its entirety. What
[7:23]
do you do with this big kind of shell of
[7:25]
a space? And then what are some of the strategies
[7:27]
that we will employ to get our zero carbon. So
[7:31]
this building. Has a geothermal they're about to put the
[7:34]
solar panels on at long last. Passing and heating cooling.
[7:39]
Like, really working with what's already there. And doing a
[7:44]
lot of modeling, to say. What's it going to take
[7:49]
to get. To a carbon zero carbon. And so putting
[7:54]
these strategies in service of hitting particular carbon reduction targets.
[8:00]
All of this modeling again, bringing in a good team.
[8:04]
But we got funds from the green, municipal funds from
[8:07]
the. Federation of Canadian Municipalities. Which is something that maybe
[8:13]
would be something you want to tap into. I mentioned
[8:17]
quickly our business plan. We had to make the site
[8:22]
financially self sustaining. There was no government grants. We were
[8:25]
a nontraditional developer. We were not building houses. As often
[8:30]
as the case with these projects. You do the heritage
[8:32]
stuff and then you build the towers around it to
[8:35]
be the business model to support the heritage. Preservation and
[8:39]
program work. Again because of the floodplain did not have.
[8:47]
The reality of creating housing. We had to create the
[8:49]
business model within the site itself. And so some of
[8:52]
the things that we did there, one is. A garden
[8:57]
shop, which kind of breaks even. And not a money
[9:00]
maker. Real estate. By creating in that one picture there,
[9:06]
that's the new building. That's the lead. Platinum building. In
[9:10]
the footprint of an old building, there's three stories of
[9:13]
new office space. And then rental space for events. And
[9:19]
that event space really was the big financial driver for
[9:22]
the site. Movie shoots, conferences. Weddings. All of those kinds
[9:30]
of things. That really provide. Collectively provide the revenue that.
[9:37]
Allowed Evergreen to provide the programs. I won't belabor how
[9:42]
we raise the money. It's a huge chapter unto itself,
[9:48]
but I will just say we needed innovator. Funders who
[9:52]
were not afraid of kind of an untested developer. In
[9:56]
a complex site. And so we found some funders who
[9:58]
are willing to get behind the idea because they were
[10:00]
inspired by what was possible. And then we also were
[10:04]
able to get some sizable public investments. We got $10
[10:07]
million from the Ontario. The government that came through the
[10:11]
Ontario Heritage Trust. Kind of out of the gates. And
[10:17]
by getting some of those early public investments that helped
[10:19]
to derisk private contributions that. Came in the fullness of
[10:24]
time. And just a few lessons learned. And I appreciate
[10:30]
I'm going through this quickly. But is this idea of
[10:35]
engaging communities early and often and to not just engage.
[10:39]
Communities, but listening and following through. When we started the
[10:43]
project, there were a lot of people who didn't like
[10:44]
us. There was a lot of people who just because
[10:47]
we represented change, And I think through our process of
[10:51]
engagement, we really showed that, no, we're actually really. Interested
[10:54]
in what ideas have come forward here and responding and
[10:58]
showing that. We were changing our plans, evolving, adapting in
[11:02]
response to what we were hearing, and again, That's more
[11:06]
than a nice thing to do, is ultimately it's quite
[11:08]
strategic. Focusing on the big picture. They haven't even finished
[11:13]
the site. It'll be years before they quote unquote. Finish
[11:16]
it. But you got to keep the big picture in
[11:20]
mind, the vision. But you also can only take it
[11:23]
one step at a time. And so creating milestones and
[11:26]
celebrating successes along the way. Were the only ways that
[11:30]
we could kind of feel like we were actually moving
[11:33]
along, because probably if people had said to Evergreen in
[11:36]
2002, do you know this is going to be a
[11:38]
$55 million project and take eight years, we would as
[11:40]
adult. Thank you very much. But. We don't have that
[11:43]
staying power, so. You get in, and then you got
[11:46]
to keep going. And asking for help. One of the
[11:52]
things evergreen did really well was. We had a sense
[11:56]
of our strength and weaknesses. But who could complement us?
[11:59]
When do you bring in the right people. A lot
[12:02]
of people. Volunteered their time or they were happy to
[12:06]
help in different ways just because they knew it was
[12:08]
a project that resonated, that it was an important project
[12:12]
for our city, and so we were very good at
[12:15]
kind of saying, hey, we don't actually know anybody who
[12:16]
can do economic modeling. Does anybody know who do economic
[12:19]
modeling? And so on and so forth. So just building
[12:21]
the team like that. This idea of revealing the site
[12:26]
over time and really respecting the heritage and the ecology
[12:29]
and not fighting it. We really learned how to work
[12:32]
with what was there, as opposed to being far more
[12:34]
interventionist. And this idea of being rigorous and that numbers
[12:39]
matter. Tripling your time expectations. We kept saying, we'll be
[12:45]
open in six months. Did we say six months? We
[12:46]
meant eight months. Like, eight years. So you got to
[12:51]
be ready that it's going to be a long haul
[12:53]
and that your budget is going to do all sorts
[12:55]
of scary things. And we had devalion engineer, and I
[13:00]
asked maybe like $85 million. Tweak, tweak, tweak, tweak, tweak.
[13:07]
And so, working all that in alignment with. Our capacity.
[13:13]
Where the demand was coming from in terms of what
[13:17]
felt like the right move once the sort of the
[13:20]
core stabilization. What are the kinds of interventions that we
[13:24]
can do beyond that are going to support the business
[13:26]
plan and the program. So those are some of the
[13:31]
ways. And we were scrappy, like we didn't say. No,
[13:34]
a lot of it was like, how might we do
[13:36]
this? How might we do this? How? Do we get
[13:37]
to? Yes. And I think if we didn't have that
[13:39]
kind of tenacious. Attitude. We probably would have been in
[13:43]
it for a few years and said, sorry, I can't.
[13:45]
Do it. It's too big. So just that spirit of
[13:48]
optimism and Emily. Should I wrap there? Should I go?
[13:54]
Yeah. So just a few more things. So that's our
[13:58]
brickwork experience. And I just thought. Given that I'm doing
[14:02]
a PhD in this area, that was all very practical
[14:05]
stuff. From. I worked at Evergreen from 20 years and
[14:08]
on that project for about 15, so that was like
[14:10]
all very practical stuff. This is. Now stepping back to
[14:14]
the ph. D. Work. And this quote really resonates. Because.
[14:22]
Again, the battle for are these sites protected and why
[14:25]
and who for and all that sort of stuff is
[14:26]
that it's really helpful to think of these as their
[14:29]
generative domain. They're not just contested, but their spaces, their
[14:33]
publicly useful space. Where we can think about our implications
[14:38]
in a complex past and a yet undetermined present. Future
[14:43]
part of me. A lot of these projects and the
[14:47]
ones I'm looking at are coming from bigger cities. The
[14:51]
high line in New York, the Tayton modern, the batter
[14:54]
seeds redevelopment in London. Projects where old industrial properties have
[14:59]
been redeveloped with millions of dollars and often what they're
[15:03]
doing as part of these cultural regeneration strategies is they're
[15:07]
contributing to tremendous gentrification. And that doesn't necessarily serve most
[15:12]
people. A couple of sites. Guttermoon Wereworth in Toronto, the
[15:16]
cold drop yards in London. UK, which are two sites
[15:20]
I'm doing my PhD on. These are examples of where
[15:23]
in these big cities. Oopsie. In these big cities. Sorry.
[15:26]
My finger moves. You can see. The cranes both around
[15:32]
the distillery and around cold drop yards. They're surrounded by
[15:36]
cranes as the kind of the economic model and. The
[15:42]
demand for housing. And. Are really being enabled because of
[15:48]
the heritage development and again, lots of benefits, but not
[15:52]
always. A benefit in service to communities. Because of the
[15:56]
unaffordability. A couple of projects that may be a bit
[16:01]
more relevant for Stratford because they are coming out. Of
[16:04]
smaller communities. One is this base, 31 out of Prince
[16:08]
Edward county and an old military area. Where they're starting
[16:12]
with huge community activations and an arts program ultimately to
[16:18]
create. A major housing development. It's just outside of Picton
[16:22]
and I think. Picton's? Population is about 30,000 as well.
[16:26]
Math mocha in north adams, massachusetts. A huge old factory
[16:30]
that played many purposes over the last century but transformed
[16:35]
into. A large art center. About 2 hours out of.
[16:42]
Boston. So. Different models exist outside of the large cities
[16:48]
as well for redeveloping these properties. And I guess I'll
[16:52]
leave it at that for now, if you will. Thank
[16:56]
you, Shauna. Is there any questions from members of the
[16:58]
city? Mark, thanks very much. That was great. Evergreen. Evergreen
[17:03]
Brickworks is a really big part of Toronto now, so
[17:06]
that's great testament to what you've done. I'm going back
[17:11]
to the practical a bit. $55 million budget. That was
[17:17]
all the building components of what you had to do.
[17:20]
55 million was the first phase, and the building was
[17:23]
about 40 million. And of that you said you got
[17:27]
10 million from the government. Yeah, we got 10 million.
[17:34]
From the province. Initially, we got 20 million from the
[17:36]
federal government and. We raised over 20 million from. Private.
[17:43]
Individuals and corporate. Okay, and. That sort of gets you
[17:50]
to the numbers that you need to do, and you're
[17:51]
required. To sort of break even on what you're doing,
[17:54]
because whatever you put in there has to sort of
[17:56]
be able to survive. And was there a lot of
[18:00]
infrastructure that you had to put up other than the
[18:02]
building part? Of it in terms of roads, environmental, all
[18:07]
that kind of stuff. Well, yes. One of the reasons
[18:11]
why 40 of the 55, because there's a lot of
[18:15]
studies. I don't know how much extra we had to
[18:18]
spend on environmental assessments, archaeology assessments, heritage. Many, many studies,
[18:25]
Evergreen footed the bill for anything that was on the
[18:28]
industrial pad. That's what? We had a head lease with
[18:31]
the city and the conservation authority for the industrial pad.
[18:36]
The city of Toronto helped with things off the industrial
[18:40]
pad. So new. Stacking lanes of a Bayview for safe
[18:47]
entry, new traffic lights, but. By and large, evergreen. Carried.
[18:54]
95% of what had to be done on the site.
[18:58]
With the city supporting things. The city has since done
[19:00]
a lot of work, for example, with the ravine system
[19:02]
and trying to create better pathways and trail connections and
[19:05]
so on. So we had a lease that was about
[19:09]
400 pages. Okay, thanks. Which is not recommended. Any other
[19:17]
questions for members? Ron. Again, thank you for your presentation.
[19:22]
I find it fascinating. Could you talk a little bit
[19:26]
more about partnerships? How you found partners, how you defined
[19:31]
a partner. If there was a buy in in terms
[19:34]
of finances or. Trades or whatever. I'm quite interested in
[19:39]
finding out what that might look like. Yeah. Because partner
[19:43]
is a big catch, all right? Yeah, I would say
[19:53]
the way I define partners. Our program partners or community
[19:59]
partners, and I'll talk about that in a sec. And
[20:01]
then some of them morphed into also business partners. So
[20:05]
the programmatic partner. So when I showed you Jamie Kennedy
[20:09]
kitchens in the gardener Museum, the Y and outward bound
[20:11]
at the beginning. They all started as people who were,
[20:14]
who were at the beginning were willing to lend their
[20:17]
names. Lend their logos, if you will, and their time
[20:22]
to helping us think through the project. And they brought
[20:27]
program energy on their own dime, down sometimes to do
[20:30]
various kinds of activations. And events. Because.
[20:40]
They had some skin in the game, but Evergreen really
[20:43]
had. Was carrying it. Right. But they were able to
[20:46]
kind of bring some of their equity and their brand
[20:49]
recognition and their capital to come and support what was
[20:53]
happening down there. We did not for that work have
[20:56]
agreements. Anything papered. Where we would start to paper things
[21:02]
would be when it would become more of. A lease
[21:06]
relationship. And so we had a restaurant tour. Who was
[21:10]
in the space he left recently, but for many years,
[21:14]
and he was a partner because he very much represented
[21:16]
the sort of the slow food principles. And so on.
[21:19]
But he paid rent. He got a percentage of. The
[21:24]
catering work and all that kind of stuff. In creating
[21:29]
those kinds of, and kind of evolving from a partner
[21:33]
relationship, which is the program and the community stuff. It's
[21:37]
high impact, but it's low risk. To. The more the
[21:43]
legal contract work, which you still like to think there's
[21:45]
still partners because they're still invested in the vision, but.
[21:50]
They're putting money on the table. As are we. Again,
[21:55]
there's still part and but a different scale of partnership.
[22:00]
We didn't have. A merger. There wasn't, like, that level
[22:04]
of partnership where you're actually really entwined they were more
[22:08]
sort of people who supported the vision and were participating
[22:11]
in different ways. Thank you. Sorry. With various levels of
[22:17]
risk and money involved. You need to cut your microphone.
[22:22]
Come up to there, Karen. Thank you. Following up. With
[22:30]
the people sitting at home. Following up on that. As
[22:39]
a partnership? That's a good question. Like, who went out
[22:41]
and said, gee, would you? Like to be a partner.
[22:45]
Because. The partnership committee doesn't have the legal entity to
[22:49]
say, sign here. So we're looking at where do we
[22:52]
go? To get these partners. And how far into the
[22:58]
legalities do we go when we meet them? So I'd
[23:02]
be interested to hear a little bit more about that.
[23:05]
Yeah. And I realized I didn't. Fully answer. How did
[23:07]
you find them? We went out because we went out
[23:10]
to people who. Once we had the vision again, like
[23:14]
this living center for sustainability. It's like, well, it's very
[23:18]
much a site about city building and clay gardener ceramics
[23:21]
museum. We want to have a strong food component because
[23:25]
that's such a part of sustainable cities. We went out
[23:29]
looking for partners who could complement the vision and the
[23:33]
program that we wanted to offer, and we didn't have
[23:36]
the expertise to do. So that was us seeking. That
[23:40]
was us saying, we need people who can, we need
[23:42]
organizations who can bring stuff we can't, right? And then
[23:48]
as. We got more momentum. We got approached more by
[23:52]
people saying, hey, can I do this or do that.
[23:55]
I guess maybe because to be a little rogue. At
[24:01]
the beginning. If their light touch kind of activations, and
[24:06]
you're just trying to work with people. To create a
[24:08]
vision. I don't think you need to get overly papered.
[24:11]
Right, and. Legal. As I say, when it would matter
[24:16]
would be. When they would be, for example, taking space.
[24:23]
Right. Sometimes there's a program partnership that's like you're going
[24:25]
to do. An event together. And it's not about the
[24:28]
buildings, per se, but it's an event. You could still
[24:32]
have an agreement that outlines rules and responsibilities. And again,
[24:37]
these things, you have to have a ton of trust.
[24:41]
In doing these things, they would matter, for example, more
[24:44]
again, when money is involved. So we did an event
[24:47]
with slow food Toronto for many years, it became a
[24:50]
big picnic at the brickworks. We did it for about
[24:52]
three or four years with slow food Toronto. And we
[24:55]
got to the point where we're like, oh, my goodness,
[24:57]
we need to actually paper this up because you're putting
[24:59]
money down. We're putting money down. Who's going to get
[25:02]
the profits? Who's going? To get bear the risk of
[25:04]
it doesn't make money, right? That's how we kind of
[25:09]
found our way through. Just a quick question. Just maybe
[25:16]
I miss it. I think you said that the site
[25:19]
is owned. By the conservation authority and managed by the
[25:22]
city of Toronto, but. Just, like, structurally. When you say
[25:28]
we, I assume you mean evergreen. Are you your own
[25:31]
nonprofit entity or. Is all of this developed or was
[25:36]
all this developed by the city? So this conservation authority
[25:41]
owns the land because it's the valley lands, and that's.
[25:45]
Part of the. Conservation act of Ontario. So that's kind
[25:52]
of in the provincial. Policy legislation. The city and the
[26:00]
conservation authority have, like, this 99 year agreement where the
[26:03]
city manages the land. That the conservation authority owns within
[26:06]
its borders. Evergreen came along as a third party developer
[26:11]
so that's why we didn't own the land. We had
[26:14]
a headlease to raise the money and operate a part
[26:18]
of the land, so. Evergreen is a nonprofit charitable organization.
[26:24]
Wholly independent of the government agency. Do you have an
[26:26]
arrangement with the city? That's my. 400 page lease, okay?
[26:32]
That lease allowed us to kind of do the construction.
[26:38]
And get to opening. And it was a 21 year
[26:41]
less a day lease because if it's over 21 years.
[26:45]
It triggers something in the appropriation act. And because the
[26:48]
site had already been expropriated. The government didn't want to
[26:53]
go there, obviously, and nor should they have. So it
[26:56]
was again. All the footwork that happens to make these
[27:00]
things happen. It was 21 years less a day. It's
[27:03]
the fine print. Any other questions from members of the
[27:08]
committee? Hi.
[27:19]
I was kind of interested. This thing is possessed. The
[27:27]
activation you did as the site was beginning. To come
[27:31]
to life. And you also noted that there's some physical
[27:35]
similarities in the actual space between what you have in
[27:38]
the grand trunk site. I'm just wondering if you have
[27:39]
any advice or suggestions or ideas that we can think
[27:45]
about as we look. To activate that site temporarily. Whether
[27:48]
it's types of uses, frequency of uses, seasonality, Different audiences,
[27:54]
different people, because we've got a fairly substantial space. And
[28:01]
we have time. So. Any advice you have would be
[28:06]
grately accepted. Yeah. And Emily, we started to talk about
[28:10]
that and be glad to talk about that more. From
[28:13]
now. If you are going to engage community partners to
[28:19]
help do it, as opposed to this group doing the
[28:21]
activations, I assume, right? I think one of the. And
[28:26]
maybe you do a solicitation process, or maybe you tap
[28:29]
a group on the shoulder because they're doing work on
[28:32]
history. And. That wonderful banner that's already there. Maybe you
[28:38]
want to work with groups however you select. Them. I
[28:42]
would just say, I guess a couple of things. One
[28:44]
is make it easy for them to get involved. Don't
[28:48]
do it. I mean, I'm somewhat facetiously here, but don't.
[28:50]
Do a 400 page lease. Make it easy for groups
[28:54]
to get involved. Because a lot of groups, they just
[28:57]
don't have the capacity. To. I think the city of
[29:02]
Toronto has gotten much better at doing partnership agreements because
[29:05]
of groups like Evergreen, having to kind of break the
[29:08]
mold. Eight years and $1 million are pro bono legal.
[29:13]
And if we didn't have the pro bono legal. So
[29:17]
a light touch activation should have a light touch. Support
[29:22]
mechanism. And sometimes it gets to with groups like they
[29:26]
don't have insurance. Because they don't have general liability insurance.
[29:30]
Will the city be willing to kind of hold that
[29:32]
for people? Is it a two page agreement, not a
[29:35]
25 page agreement? For light touch activations make it easy
[29:39]
for people to participate because they're going to. Bring their
[29:45]
networks, their brand and their equity that's going to ultimately
[29:49]
serve the project. So I would just try to think
[29:53]
about. How to remove barriers that make it easy, and
[29:57]
then in terms of what you want to do, I
[30:00]
think those are really creative and fun conversations. Thanks. I
[30:06]
saw the hand in the back. But any other members
[30:08]
of the committee? For steering. Working group chairs or staff
[30:12]
members. We don't normally open it up to the floor,
[30:15]
but if you want to. Sure. I found it all
[30:20]
very fascinating. I'm just dropped first. I actually grew up
[30:23]
in the water there, and I was in multiple different
[30:25]
cities, but I just wanted to say I was. Wondering,
[30:29]
is it wise to incorporate a few of the larger
[30:33]
partners first and really work on that? Development with the
[30:37]
offices. To start getting flip traffic to the area and
[30:41]
movement towards the area and into the area, into. The
[30:45]
grand trunk. Throw it. Is that a good. Point. My
[30:50]
sense is that you have to be working on both
[30:53]
levels. Right, because the little activations are nice for, like,
[30:59]
doors open. And a movie knife, but it doesn't move
[31:03]
the needle. And so I think at the same time,
[31:06]
the city needs to be working with the YMCA and
[31:08]
maybe the library, maybe Waterloo, right, to try to land
[31:12]
some of those, because. Those define the project materially. So
[31:18]
it's a bottom up top down thing that you're constantly
[31:20]
toggling. Between. Yeah. Create some of those new projects. And
[31:24]
the big idea is they land that they give the
[31:26]
future. In terms of the viability and will attract the
[31:30]
larger infrastructure dollars. Right. It's more of an art than
[31:36]
a science as well. Thank you so much. Emily? Yeah,
[31:42]
I just wanted to make one comment or two comments.
[31:44]
I guess I just really want to thank you, Shauna,
[31:46]
for coming to share this presentation with us today. I
[31:48]
know Sean and I spent some time together this afternoon
[31:50]
and chatted last week in advance of today and one
[31:52]
thing that you said, shauna, that really resonated with me.
[31:56]
Was this idea that. We sometimes think this stuff is
[32:00]
going to be linear. And I think when you were
[32:03]
talking about this. Sometimes when you present this stuff back,
[32:05]
it feels, Jonathan said like, yes. And people are like,
[32:06]
oh, you took this step, this step, this step. And
[32:09]
not to take your thunder, did we talk? About kind
[32:11]
of how you responded to that. It's like linear versus
[32:15]
how it actually felt. Yeah, I forgot to put in
[32:18]
that slide. So. Yes, it does. With the beauty of
[32:23]
hindsight. And then we did this, and then we. Did
[32:26]
that. And then this is. And it looks like it
[32:28]
was hugely intentional. Most days it felt like a snowstorm,
[32:33]
right. And. So when I was showing the slides show
[32:37]
with a community group or something like this slideshow. Earlier
[32:39]
this spring, community group that wants to do a campaign
[32:42]
of their own. I said I showed like this ball
[32:45]
of yarn. I said, most of the time it felt
[32:51]
like this. It did not feel linear, right. And it
[32:55]
did not feel like. We did not know. What we
[33:00]
did not know. That comes back to. Creating that culture,
[33:06]
an organizational culture or committee structure. However you're going to
[33:09]
work this to say. Okay, well, how do we adapt
[33:12]
to that new, how do we adapt to that information?
[33:16]
A fellow who was on our committee, a good friend
[33:18]
of Melanie, he would say. It's. Like you're throwing balls
[33:20]
up in the air. You just come throw balls in,
[33:22]
you drop. One art, grab another one, throw it up.
[33:24]
And so a lot of, especially in the formative stages
[33:27]
when you're trying to see, like, what can this building
[33:30]
hold? Like one of the reasons why our cough. Construction
[33:36]
were so because we wanted to do it all. And
[33:38]
then while we can't afford that. Scale. Scale, scale readap.
[33:40]
Readapot approvals. We had no idea the levels of approvals,
[33:44]
et cetera, et cetera. But this culture that's like, okay,
[33:48]
how might we do this? What do we learn from
[33:50]
that. What are we going to let go of? How
[33:53]
do we keep building more supporters than naysayers? And one
[33:59]
of the ways you do that is also by showing
[34:01]
that you're pivoting. Yes, we had master plans, and, yes,
[34:06]
we had project plans, and they helped to kind of
[34:08]
create a sense of direction. And kind of milestones, but
[34:13]
how that gets done? Is not linear. Thank you very
[34:19]
much, Shauna. I think that wraps up our questions on
[34:23]
behalf of the committee. And the city of a resident.
[34:29]
Thank you so much. Gift of our appreciation for coming
[34:31]
today. Okay. Thank you.
[34:45]
Item six is business arising from previous minutes. Item six,
[34:49]
one is the indigenous engagement consultation strategy, Kevin. And Una
[34:53]
are here to provide us an update on their work
[34:56]
and what we can expect in the coming weeks, so
[34:57]
I think unal invite you forward. Poor Kevin is not
[35:01]
here today unexpectedly. So Una is taking up the mantle
[35:05]
on her own today. Thank you. Chair. I just want
[35:15]
to give you sort of an update. From the overview
[35:19]
that we presented at the last meeting. We've kind of
[35:23]
drilled down into the different steps that we need to
[35:26]
take, and we're moving forward with those steps. With a
[35:29]
view to creating a consultation plan with indigenous people. So.
[35:36]
We're calling this? Well, it's obviously a pre consultation phase,
[35:38]
so we're. Calling this relationship building phase, if you like.
[35:43]
And as you heard in the land acknowledgment, Stratford is
[35:47]
land that. Is really, I guess, referred to by many
[35:52]
different First nations. So the first step for us is
[35:55]
identifying those various nations to be able to even identify
[35:59]
those indigenous organizations and stakeholders, including knowledge keepers. Elders, youth
[36:06]
treaty organizations, urban indigenous. Communities to ensure that we have
[36:11]
a comprehensive representation. We've done some sort of preliminary work.
[36:16]
With the city of Guelph, just in terms of trying
[36:19]
to get some information. But also trying to help us
[36:24]
understand what this process. Involves and being able to ensure
[36:29]
that we have representation of all of the folks that
[36:33]
identify as having moved through this land is paramount to
[36:37]
us, and so we're hoping to compile. A comprehensive list
[36:42]
of indigenous interestholders. Secondly, we're looking at. The land acknowledgment
[36:48]
itself. So once we've identified the interest, then. We can
[36:50]
be able to go back to the land. Acknowledgment and
[36:53]
actually identify those nations. And to have workshops. With project
[37:01]
teams on this committee, but also with planning department in
[37:05]
terms of those indigenous protocols. As we know, different nations
[37:11]
have obviously. Different, maybe competing interests, if you'd like, but
[37:16]
various ways of culture. So how do all of them
[37:20]
get represented. And then thirdly, it's the initial outreach, so
[37:24]
that would be working with the committee. To send formal
[37:28]
communication to indigenous governments and organizations. Outlining the project's scope
[37:35]
and its objectives and their right to participate in the
[37:38]
consultative process and to ensure that communication. Is clear and
[37:43]
how their input will influence decision making. And so that
[37:47]
will involve, obviously, drafting and sending formal limitations with the
[37:50]
follow up plan. For continuous engagements, and then we hope
[37:54]
to be able to identify what that sort of consultative
[37:58]
phase plan actually looks like, and so we'll be giving
[38:02]
you updates periodically. Any questions for Una? Yes. Add one
[38:11]
thing, because Kevin couldn't be here today. So really, the
[38:13]
intention of what? Una's described is kind of these immediate
[38:16]
next actions the team is going to be taking as
[38:18]
they prepare. A plan for you. Review. So the intention
[38:23]
is for the team to come back to this committee.
[38:26]
In October to share with you a draft plan. But
[38:29]
the steps that una's outlined here. Are really the things
[38:32]
that need to. Inform a draft plan. So what she's
[38:35]
described today are these things that are underway, right? Now
[38:38]
and are going to inform a draft plan that will
[38:41]
come to you for your consideration. So. That we just
[38:44]
wanted to be sure that everyone understood coming out of
[38:46]
last month that the things are happening right now. They're
[38:49]
underway, but the plan itself. You won't see for another
[38:54]
month until we meet again. Thank you very much, Una.
[38:57]
There's no questions. It's actually a question of. For this
[39:07]
committee to consider. I think I have a small understanding
[39:12]
of how deep and complex indigenous cultures are. And there
[39:19]
are a variety of them. As I understand it. They're
[39:24]
not always indigenous. Communities are not always in agreement with
[39:28]
each other. A variety of issues. And. I appreciate what
[39:35]
it is we're trying to do. We're trying to develop
[39:38]
protocols. But I note in the last minute, That there
[39:46]
is a wish to try to incorporate indigenous perspectives and
[39:50]
design and space use. This may be hugely over simplistic.
[39:59]
But I put it out there for consideration. Has any
[40:03]
thought been given to simply dedicating a space. For the
[40:07]
exclusive use of indigenous communities so that they can present
[40:11]
their own message or messages at their discretion rather than
[40:16]
us. Trying to determine, through Develop protocols, what it is
[40:22]
they're trying to say. Just give them an opportunity to
[40:25]
say it. One of the preliminary discussions that we had
[40:28]
with the casuenta two row, now group. Was myself and
[40:35]
Ray. I can't remember his surname. But we had spoken
[40:38]
with them and they had come up with a number
[40:40]
of ideas. Thinking about the space, thinking about. How their
[40:47]
culture could be represented in such a space. There were
[40:51]
ideas. From their perspective, and that involved some aspect of
[40:56]
what a friendship center might look like and what that
[40:58]
might entail. But that's one organization that we're working with.
[41:02]
But there are also other organizations. As well. So it's
[41:05]
like, how does everybody have a voice? What are the
[41:09]
people that need to come to the table in terms
[41:11]
of those that have interest? In Stratford as well as
[41:14]
this organization. Follow up question, Mr. Sheriff, shouldn't we let
[41:18]
them determine. Which groups should be represented rather than us
[41:24]
trying to determine that? Absolutely. But shouldn't all the groups
[41:28]
also understand that this is happening. I agree with that.
[41:34]
Yeah. That Stratford encompasses their land. We have a duty
[41:39]
to inform. Anything further for Una. Thanks so much. Appreciate
[41:44]
it. Thank you. Item 62 is with regard to the
[41:48]
draft 2025 budget for the grant Trump renewal project, and
[41:52]
Joan Thompson, the CEO, has taken some of the feedback
[41:55]
given at the last meeting and has an update with
[41:57]
regard to that. Joan over. To you. Thank you very
[42:02]
much. Through you, Mr. Chair. So we did hear the
[42:05]
concerns about the draft budget that was presented at the
[42:09]
last meeting. In response to this, we have incorporated the
[42:15]
GTR work plan for the budget into the overall budget
[42:19]
of my office and broaden the description of the various
[42:23]
items. So there is still going to be an envelope
[42:26]
of funds available. That will be presented to Councillor. There
[42:30]
were questions about that allocation. In particular for the installation
[42:36]
and servicing of the roads, as well as the design
[42:39]
work related to that. So this revised budget document provides
[42:44]
a high level overview of the grand truck work plan.
[42:48]
Those work plans have already been presented to you. They've
[42:50]
been presented to Councillor and. The budget relates to a
[42:54]
Q three and the Q four work plan that the
[42:57]
committee recently prepared. And endorsed. The budget document indicates that
[43:03]
the funds from the Grand Trunk reserve will be used
[43:05]
in accordance with. The approved work plan and at the
[43:08]
discretion of Councillor. So ultimately, it is still Councillor that
[43:11]
makes. The decisions as to the various items when they're
[43:15]
ready to move forward. This means that with Councillor direction
[43:19]
funds, because it's an envelope of funds can be allocated.
[43:22]
From the reserve fund to support the work plan as
[43:25]
needed. Also want to address questions about the capacity and
[43:30]
the staffing that were raised at the meeting. So again,
[43:34]
funds from the Grand Trunk reserve will also be allocated
[43:37]
to invest Stratford, which is our partner agency to support
[43:41]
staffing for this project. So as part of the invest
[43:44]
Stratford budget that comes forward to counci. Council for council's
[43:47]
approval. There is a sum of money included in that
[43:51]
to expand the staffing capacity to support this. New project.
[43:57]
This is again subject to approval from invest, Stratford Board
[44:00]
and Councillor approval through the budget process. And if there's
[44:04]
any questions. Any questions for Joan? Thank you very much
[44:10]
for the update. Item 63 is the grand trunk activation
[44:14]
animation update, and I'm going to turn it over to
[44:17]
Tim and Emily to give us some background with regard.
[44:19]
To it. So through the chair, I had a quick
[44:26]
presentation. Until tonight. Shauna Andrews. And my presentation was on
[44:31]
a lot longer, so some great points came. Out and
[44:34]
things that we are already looking at. Last meeting. I
[44:37]
know it was brought up about animation. There's interest in
[44:40]
the community to see something going on in there. The
[44:43]
mayor. Mayor Ritzma Emily Robson and my community services team
[44:47]
already had a meeting. That week to discuss that very
[44:50]
item. So we are discussing. Looking at what processes we
[44:54]
have to do to get this going. What's some of
[44:56]
the hurdles that we have to get over. There's some,
[44:59]
obviously looking at permits occupancy. Rate and other items. Just
[45:04]
looking at site remediation. What can we use? Maybe there's
[45:07]
parts of the site that we stay away from. There's
[45:10]
also sites where you say, you know what we have
[45:11]
fence it off, utilize those areas. So the community services
[45:16]
team, I should just bring up that. So manager Darcy
[45:19]
Drummen, manager of recreation marketing. Jeff Auden, our supervisor, recreation.
[45:25]
And then we have two other coordinators. We have our
[45:26]
event. Coordinator Kirsten Ridell. And our. Heather Denny as well
[45:33]
is in there. As well as. Getting all these names
[45:37]
in here, so. Lana Bose, who is our sports cultural
[45:41]
sponsorship coordinator. So the plan is to meet this week.
[45:45]
We are going to go back on the site, start
[45:47]
generating ideas as to what can go in there. I
[45:50]
think we have a municipal cultural plan. We have as
[45:53]
a documentation on what we can also incorporate within this
[45:57]
site on activation animation. And then come back to the
[46:00]
team and to come up with a process on how
[46:03]
do we contact and get this applications in or if
[46:06]
people have a request to do animation. What's the process.
[46:10]
So that's where coming out of Shauna's presentation, And through
[46:15]
Andrew's questions. Pull up. These are the things we're looking
[46:17]
at. Is how do we make it easy? We don't
[46:19]
want a 20 page document that people are just going
[46:22]
to turn away and not want to do it. So
[46:24]
making it easy, get groups involved. Insurance will definitely be
[46:28]
part of the process, whether we look at city issued
[46:31]
insurance that we can do or the group does it
[46:33]
on their own. Have, like I said, an easy agreement
[46:37]
to remove those barriers. And I think one thing that
[46:40]
I did talk to my team about is we don't.
[46:42]
Have to be the thought process on what goes in
[46:45]
there. The community has lots of ideas and once. We
[46:48]
just make a process on. This is how you contact
[46:51]
us. This is how we get these initiatives moving forward,
[46:55]
the rest will fall in place. So that's where we're
[46:56]
at. Any questions, I'd be happy to answer. Ron. Thank
[47:04]
you. Just a quick question. Do you have a sense
[47:05]
of a timeline on when activations such as? A low
[47:10]
level of activation might happen. Or could happen, looking at
[47:14]
our own plans, but I'm. Now trying to merge it
[47:16]
with what you're saying through the chair. I think part
[47:19]
of that would be. We question whether a winter activation
[47:23]
would be something that maybe we're not sure that's? Going
[47:26]
to be in there, but ideally, we would like to
[47:28]
get this moving quick. The talks out there. The interest
[47:31]
is out there. So I think once we get the
[47:34]
stop out, on site, see what's going on there, we
[47:36]
can start moving forward. And some of those low hanging
[47:39]
fruit that we can maybe do quick, easy wins. To
[47:41]
get that in, we would like to do sooner than
[47:43]
later, so. I would hope in my world, the fall
[47:46]
would be great. To get something out there, I would
[47:49]
agree. I know that there are several arts groups that
[47:51]
are very interested in doing something on the site again,
[47:54]
low level and. It would be a good beginning. Thank
[47:59]
you. So along with Tim's team and community services, The
[48:06]
part of this endeavor that I've picked up and I'm
[48:08]
working on in partnership with in destinations dratford. And Stratford
[48:13]
Summer Music is actually figuring out what would a footprint
[48:16]
in that building look like? So. The kinds of things
[48:19]
we're talking about is like, okay, if we use this
[48:21]
kind of footprint here. What are the actual safety measures
[48:24]
that need to be in place? So what we're working
[48:25]
at right now is like, okay, we've got engineered fencing,
[48:29]
and it's in this footprint. What needs to change? Like
[48:31]
there's some holes and. Stuff like pits in that area.
[48:35]
Those need to be filled up, and we're really lucky.
[48:37]
To have partners in both those organizations who have brought
[48:41]
some real expertise. So, for example, We're meeting. With expert
[48:45]
in health and safety who has worked on many projects
[48:49]
repurposing. She worked on one to repurpose an industrial site
[48:52]
that was unoccupied as a performance. Venue. So what we're
[48:57]
working on right now is what is. The parameters for
[49:01]
an event in this space and working out, like, what
[49:03]
does it actually cost to. Put those things in place
[49:07]
and then. What kind of activity does that permit? So
[49:11]
that's really active right now. We're expecting recommendations from. Her
[49:15]
name is Janet Celery on the health and safety measures,
[49:18]
and we're working up what an actual design looks like.
[49:23]
In the building for the space. I mean, the great
[49:26]
news is it's huge. So you can get a lot
[49:29]
of occupancy only using a very small portion of the
[49:33]
site. So that really limits the types of, like, we
[49:35]
don't have to fill every empty elevator. Shaft. We can
[49:39]
just deal with the space that's within the footprint. That
[49:43]
we've identified. So I'm really, really pleased to have. The
[49:47]
partnership from both those organizations in TIm's director Wolf team
[49:51]
working on it. So it's a really exciting moment. There's
[49:54]
lots of great momentum, and as we've said before, lots
[49:57]
of real interest in the community to use that space
[50:00]
and to just emphasize what Shauna said about part of
[50:03]
the reason this work is important is because. We need
[50:06]
it to be easy and accessible for community organizations to
[50:09]
use that space and not expect. A lot of heavy
[50:14]
lifting on their part to be able to mitigate the
[50:16]
risks on the site. Thanks. Very much.
[50:26]
Next item is six. Four discussion points came from the
[50:28]
real estate legal and finance working group and I do
[50:31]
know that Joan and Taylor have got them and are
[50:34]
prepared to walk through if that's okay, Frank. Should I
[50:38]
serve the commentary? Mr. Chair, if you'd like to give
[50:40]
an overview. First off, I'll start by saying thank you
[50:44]
very much and my apologies that I was unable to
[50:46]
attend the August 29 meeting. So thank you very much
[50:48]
for allowing this report to come. Forward to this September
[50:52]
meeting. Our group met in August. And, of course, from
[50:57]
the committee would be Paul and Mark. So thank you
[50:59]
for their input as well. As well as a good
[51:04]
group of skilled individuals. With good business acumen to be
[51:09]
that review type component. As this progresses. So, first off,
[51:16]
I'll also say thank you to Joan for a great
[51:18]
presentation on August. 29. I enjoyed watching it after the
[51:21]
fact and your budget update today. Thank you for that.
[51:24]
As well. It actually addressed one of the four questions
[51:26]
that we're in already, so I'm sure you did that
[51:29]
intentionally so that I wouldn't have to ask the question
[51:31]
now, but. Thank you. One of the things that is
[51:34]
interesting with the way that this organization is set up
[51:38]
is that we've got these silos of working groups, but
[51:41]
as you know, there's so. Much crossover between these working
[51:44]
groups that. Those chair meetings are very important. And the
[51:49]
intersection of development. And finance are where you're going to
[51:53]
find some of these questions and Steve Cooper and I
[51:55]
have met to talk about them as well. But maybe
[51:58]
I'll just stop there. Should I pose the questions, Mr.
[52:01]
Chair? I think they have them so we can walk
[52:03]
them through. Thank you very much, Joan Taylor, which everyone
[52:06]
would like. To take the lead. So if I understand
[52:10]
that the first question has to do with the environmental
[52:12]
consideration, So the short answer to the questions is yes
[52:17]
and yes because we are getting yes as we heard
[52:20]
with Sean. But there is more to the simple answers
[52:24]
of yes, yes, and yes. So if Taylor, if you
[52:27]
wanted to start with the environment. Sure. Absolutely. So we've
[52:32]
had a decent amount of experience over the last few
[52:34]
years looking to environal mental radiation for the existing building
[52:38]
block, which has given us some insight what to expect.
[52:41]
As we proceed. With the rest of the site. In
[52:45]
reality. How we proceed with remediation depends on various factors,
[52:52]
including. What is the interest from the development community? They
[52:57]
helped guide or dictate. What kind of condition they're looking
[53:00]
for to have a landon if they're going. To build
[53:02]
upon it, right? So some developers. Are more apt to
[53:07]
risk and would consider taking on remedial activities themselves. However,
[53:13]
some due to insurance or liability requirements, what have you
[53:16]
that are finance agencies are less prone to risk and
[53:19]
rather see the municipality take on the environmental remediation initiatives.
[53:26]
The city is fully able to proceed with such environmental
[53:29]
remediation. There is some funds available. If Councillor decides to
[53:34]
proceed in certain areas. To take on. Environmental assessment work
[53:40]
that is required. It also depends on which section of
[53:45]
the site or building that is being looked at there's.
[53:48]
Various levels of contamination that exists on the overall site.
[53:54]
And so. That would guide. How also we could. Proceed.
[54:00]
To be development ready. That's kind of it in a
[54:04]
nutshell. If there's any specific questions. Mr. Chairman, it seems
[54:09]
to me. We keep going around the mulberry bush. I
[54:16]
believe that. Not using euphemisms. So environmental considerations, let's call
[54:20]
it. What? It is. Talking about polluted or contaminated areas.
[54:28]
And it seems to be a common theme. Across a
[54:34]
number of working groups. I'm looking at page 21. The
[54:38]
agenda ad hoc or the infrastructure and environmental working group?
[54:46]
Second action item is prepare a report outlining environmental issues.
[54:52]
On the next page and page 22. It says a
[54:55]
concern is the discovery that only a partial site record
[54:59]
of site report with required remedial actions has been undertaken.
[55:04]
So we really don't know. I think. Where the polluted
[55:10]
or contaminated areas are. We don't know the extent of
[55:13]
it by reading this correctly. Sure. No. So the site
[55:18]
has had environmental investigations over decades, so there is a
[55:21]
lot of information. About where and what pollutants exist. The
[55:27]
question then becomes which parcels being looking to develop because
[55:30]
there's various levels of contamination. So some parts of the
[55:33]
site, there's very little and very little needed to be
[55:35]
done. To remediate the site. Other sections of site have
[55:38]
a lot more significant pollutants. Which require further remediation. Do
[55:44]
we have, Mr. Chairman? A complete. Investigation report. Of
[55:54]
all of the polluted or contaminated areas. The extent of
[56:00]
it. What it is. Yes, we do know. We don't.
[56:06]
Through the chair. Like I said, there's been extensive studies
[56:09]
for the years, so we have. A fairly good idea
[56:11]
of what pollutants are where. Through the entire site. Fairly
[56:17]
good idea. There's dozens of boreholes that have had been
[56:22]
investigated. And each identify specific levels of contamination that exist
[56:28]
within the site itself. So depending on the site, it
[56:32]
depends the type of container that exists. So we have
[56:34]
a good understanding of the historical use of a site
[56:37]
and based on history we know, quite likely. The source
[56:42]
of the contaminants because our boreholes are saying this is
[56:44]
the type of contaminant. And then it confirms historically that
[56:46]
was the function of use in that area. So that
[56:49]
will guide which kind of remediation proceeds, because each type
[56:53]
of contaminant will have a different response required. To make
[56:57]
it clean for the intended use. I'm not trying to
[57:01]
be difficult. I'm really not. Trying to understand. Again through
[57:06]
the chair. So. Is there a master plan showing.
[57:16]
What areas are contaminated with what? The extent of it.
[57:21]
And the second question, I suppose, would be what would
[57:24]
be the cost of remediation. Because what I'm getting back
[57:27]
to. Is. The use to which. A certain area can
[57:33]
be put. Is often determined by the extent of the
[57:38]
contamination. Could I just piggyback on that? Has an entire
[57:42]
phase two study been done on the entire site. I
[57:51]
believe there's been a phase two done for the entire
[57:53]
site, but it would probably be outdated at this point
[57:55]
because it's been years since the entire site has been
[57:57]
investigated. The focus in the last few years has been
[57:59]
predominantly on the Cooper building itself. As that's the focus.
[58:05]
For future development now. Picking back to the other. Questions
[58:12]
in terms of what's been investigated for the site, so.
[58:16]
If you look at the recent record of site condition
[58:18]
for the Cooper Building, Did an extensive historical assessment of
[58:23]
what has been investigated. So it shows a map of
[58:25]
all the boreholes that have been investigating the site, and
[58:28]
it's quite extensive. It helps guide. Where their investigation moves
[58:36]
forward. So, yes, there has been investigation for the entire
[58:40]
site. In the last few years where environmental assessments. Has
[58:47]
more been developed, has been on the Cooper building itself,
[58:50]
and that's where more investigation and more analysis been done
[58:53]
so that future development can occur on that section of
[58:56]
site. Mr. Chairman may I? Go ahead. Follow up. Thank
[59:00]
you. I'm out of my depth here. In terms of
[59:04]
the science, but seems to me logically the first thing
[59:09]
we need to do is get. A complete examination of
[59:14]
all of the areas. And an updated report, not just.
[59:21]
The building itself, but all of the areas. Find out
[59:25]
if. It's contaminated. B with what? And see what the
[59:30]
cost of remediation. And then if it goes to market.
[59:35]
We can say this area is clean or this area.
[59:40]
Is contaminated with this substance. And our understanding of cost
[59:45]
remediation is x number of dollars. Are you not interested?
[1:00:08]
I'll make this really quick. I think this is an
[1:00:10]
issue that keeps coming back and I think both for
[1:00:13]
the committee and for staff. I think it would be
[1:00:15]
very useful if somebody could come before the committee and
[1:00:17]
explain the step by step process of brownfield development, including
[1:00:22]
risk. Assessment, risk mitigation, risk sharing, all of this stuff
[1:00:26]
so that we all have a unified. Understanding of how
[1:00:29]
the process works, both from the staff perspective and the
[1:00:33]
regulatory perspective from the developer's perspective, because this site is
[1:00:37]
going to get developed in this contaminated soil on it
[1:00:40]
and I think instead of having 15 different perspectives on
[1:00:42]
how this work, because it all is subject to the
[1:00:45]
same regulatory approvals and the same development process. And there's
[1:00:49]
lots of precedents in Ontario of where brownfield development has
[1:00:53]
happened on contaminated soil. It's been remediated in all sorts
[1:00:55]
of different uses been built on. It be nice if
[1:00:57]
we could find a project like that we could review
[1:01:00]
and just so everybody. Could understand how it works. And
[1:01:04]
maybe have. People's concerns eased about how the process works,
[1:01:11]
who pays for it? What are the different financial models
[1:01:13]
for it and the different risk sharing models for it,
[1:01:15]
because I can see there's. A lot of hang ups
[1:01:17]
on this, and I think we should probably strive to
[1:01:21]
get past it so that. We can keep going, but
[1:01:25]
clearly this is one that's captured a lot of people's.
[1:01:27]
Imagination, so there's lots of precedents around. I'm sure that's
[1:01:31]
something we can manage. That's a suggestion. Three aims to
[1:01:35]
share. So hear what you're saying. So my advice, Mr.
[1:01:42]
Chair, is for this committee to make. A motion directing
[1:01:47]
staff to go and seek the expertise that they're looking
[1:01:50]
for. And go through that process. So I think the
[1:01:54]
motion would be that we ask staff to investigate. Presentation
[1:02:00]
with regard to the risk mitigation and the addressing of
[1:02:03]
environmental concerns and the inventory of those concerns on the
[1:02:07]
site and to help us develop a strategy to move
[1:02:10]
forward is that acceptable. All. You move it. Second. Mark
[1:02:16]
discussion on that. So I think that would be as
[1:02:19]
easy as getting golder, who did the reporting. To whoever
[1:02:24]
was head of golder at the time of doing the
[1:02:27]
reports to come in and do the presentation and a
[1:02:29]
summary of what's been investigated and what's yet to be
[1:02:32]
investigated. Thank you. Thompson. All those in favor of the
[1:02:39]
question? Thank you. Taylor back to you.
[1:02:49]
Is there further questions? That are being asked of me
[1:02:54]
at this time. Sorry. Is there anything else, Frank? Thank
[1:02:56]
you, Mr. Chair. It was a question in regards to.
[1:03:02]
The intersection again of development and finance. We are looking
[1:03:06]
at. Models that. Will be potential uses such that we
[1:03:13]
can defray some costs. And we're specifically talking about residential
[1:03:17]
and. When our intersection happens. Is the parking something that
[1:03:26]
staff Councillor will consider? For not only our environmental stewardship
[1:03:32]
but also reduction of vehicular dependency. Are we moving forward
[1:03:37]
with reduced parking requirements for residential development? That's ultimately. Question.
[1:03:46]
Thank you. So again, at the last meeting, we had
[1:03:53]
the presentation from the director of building and planning, who
[1:03:56]
talked about community benefits as well as parking. So just
[1:04:00]
to reiterate again, the answer is yes. The city would
[1:04:05]
certainly be supportive of reducing the parking requirements, particularly if
[1:04:09]
structured or underground parking facilities on site or off site
[1:04:13]
in the downtown core were constructed to absorb the demand
[1:04:17]
on the site. This would help maximize land use and
[1:04:21]
support sustainable development goals. Currently, parking reductions are considered on
[1:04:26]
a case by case basis and would ultimately require council's
[1:04:30]
approval with key considerations, including the community benefits offered, proximity
[1:04:35]
to transit, and as we already know, The transit hobby
[1:04:39]
is already on site, so we are well connected. The
[1:04:42]
overall environmental stewardship and the long term impact on downtown
[1:04:47]
parking availability. Yes, we would consider it. So I take
[1:04:56]
it from that comment that this would be a site
[1:04:59]
specific consideration. Ms Thompson. Or are you indicating that? This
[1:05:08]
would be a citywide type change. I think. It's both.
[1:05:15]
Because you can't take a look at the parking requirements
[1:05:18]
on site. If we wanted to reduce the parking on
[1:05:22]
site because we've got existing transit and we're wanting to
[1:05:26]
expand on the transit hub concepts that we also have
[1:05:30]
to take a look. At. If we're reducing the parking
[1:05:32]
there, where can we make up some of that? Parking
[1:05:35]
if it's needed. So we have to look at the
[1:05:38]
other existing municipal parking lots and the impact you have
[1:05:41]
to look at the parking system that we have as
[1:05:43]
a system, and it's not individual law. Because you make
[1:05:47]
some decisions on one, it may have an impact on
[1:05:50]
other. Parking lots, parking system. And the last thing we
[1:05:54]
want is to drive overflow par. Parking onto the residential
[1:05:58]
streets. So we are looking at the whole system. But
[1:06:02]
definitely. It will be specific. To what is needed on
[1:06:07]
the grand trunk that will be driven by the uses
[1:06:09]
there and the capacity on site. Any other questions, follow
[1:06:15]
up, if I may. Sure. Thank you. On the bonusing
[1:06:21]
and community benefits side. If I could dive into that
[1:06:23]
for just a second. Because it does make a significant
[1:06:26]
difference on the viability from a financial perspective, whether this
[1:06:30]
project is even feasible or not. And it's kind of
[1:06:34]
from a 30,000ft perspective. There's some apprehension from some of
[1:06:40]
the and. You probably. Obviously. Can't respond on behalf of
[1:06:46]
Councillor, but there has been some apprehension in the past.
[1:06:51]
To approve buildings of a higher number of stories. Let's
[1:06:55]
just say it that way. I cannot see that this
[1:07:00]
will be a viable project if we don't get the
[1:07:02]
higher. Number of stories, quite frankly, and. I don't know,
[1:07:06]
ultimately, what the question I would be asking. It's more
[1:07:09]
a question, I guess. Of what's council's flavor? For engaging
[1:07:13]
in something like that. Sorry. Maybe, Mr. Chair, I'll start.
[1:07:22]
So again, in talking about community benefits again, our director
[1:07:27]
of building and planning. The last meeting did talk and
[1:07:29]
do a presentation with respect to community benefits. How the
[1:07:33]
existing community benefits that are already in place for this
[1:07:36]
site. But looking at the future. So again, the city
[1:07:41]
is prepared to allow for community benefits as listed. Under
[1:07:44]
the existing official plan document, so it's already there. This
[1:07:49]
would need to include community benefit agreements or development agreement
[1:07:53]
as potential tools to secure the desired benefits. So as
[1:07:59]
part of that, the city is also open to expanding
[1:08:01]
these provisions to incentivize developers to maximize the property. However,
[1:08:07]
any final decisions on these matters rest with Councillor. While
[1:08:11]
the timeline as we understand it, for formalizing the development
[1:08:15]
vision extends to the end of 2025. If a financially
[1:08:20]
strong development meets the majority of the city's objectives. Councillor
[1:08:25]
in the city. May want to initiate discussions earlier. So,
[1:08:31]
again, that's a long answer, but it is yes. We
[1:08:34]
know that community benefits. And looking at the density and
[1:08:39]
the height over there is a discussion point. We have
[1:08:44]
been having some preliminary discussions overall with city Councillor with
[1:08:49]
respect to. Number of stories and heights across the community.
[1:08:55]
You've seen some developments come forward that are starting to
[1:08:58]
identify that we need to intensify. Especially when it's on
[1:09:03]
infill. I believe his worship. Yeah. And I'll echo most
[1:09:08]
of what Joan, Ms. Thompson has to say. I know
[1:09:12]
in council's visionary process early on, There was an absolute
[1:09:19]
understanding and support of both higher density and higher heights
[1:09:24]
with regards to the grand trunk site. In order to.
[1:09:31]
Be. Encouraged developers to be on site and therefore. Enhance.
[1:09:39]
The tax base from that work to support the public
[1:09:43]
spaces. Is it unanimous? No, but I would think that.
[1:09:51]
There's certainly an overall majority that would say on Councillor.
[1:09:54]
Yes, we understand. Higher density, higher. Heights on that location.
[1:10:00]
Thank you. Anything further. Is there anything Joan or Kaylee
[1:10:07]
wanted to be on that? Thank you very much. Item
[1:10:11]
seven. We'll go to report the working group. Staff of
[1:10:15]
base. Item seven one is partnership. Herb and Karen, do
[1:10:18]
you have any one? Partnership. Working group updates, training. We
[1:10:23]
did present one, but I don't see it in here.
[1:10:29]
So. Come on up to the microphone.
[1:10:50]
This report is for information only. Overview of previous month
[1:10:56]
and activities planned. On September the 15th, John Cassner Karen
[1:11:00]
Haslam visited the Rotary Club presentation. On October 17, John
[1:11:04]
Castner, Herb Classon will visit the Lions club. October the
[1:11:08]
21st, John Classen, Karen haslam and Herb Classon will visit
[1:11:13]
the Kawanis. Club. So we're doing a lot of service
[1:11:15]
clubs. They are starting up in September, and that's where
[1:11:18]
we are. October, visit and presentation to the Kinsman club.
[1:11:22]
That date is still waiting for them to get back
[1:11:25]
to me with a positive. Ron Dodson is part of
[1:11:28]
our working group, and he is working with the Perth
[1:11:31]
county players and the arts groups to see if partnership.
[1:11:35]
Can be established with the YMCA. Overview of coming months
[1:11:38]
the working group will continue to visit with the clubs
[1:11:40]
in Stratford area to see if they would like to
[1:11:43]
use the community space at the Gtr. That's where. We
[1:11:48]
are in the process right now. Thank you very much.
[1:11:50]
Any questions? Great. Thank you. Thank you. Item 72 is
[1:11:57]
the vision, architecture and planning working group. Melanie couldn't be
[1:12:00]
here. Emily is. There anything more to unless there's questions.
[1:12:05]
Item 73 is real estate, legal and finance. Franklin, do
[1:12:08]
we cover everything under six? Four? Thank you. Devin Ford,
[1:12:11]
John and Andrew communications, advocacy and civics engagement. Thank you.
[1:12:19]
Very briefly, Over the past. Sort of. Since the last
[1:12:27]
time we met, Andrew and I have updated the faqs
[1:12:31]
on the website to reflect the current environment. And also,
[1:12:35]
we've also updated the speaking points. They're currently in the
[1:12:38]
draft form. We're waiting for the city's decision regarding the
[1:12:42]
guiding principles. We think that's. A bit of a milestone
[1:12:45]
event at that point. The faqs will be updated. I've
[1:12:49]
reached out to Mike bytes, made a couple of what
[1:12:52]
I would call housekeeping changes. In the inter. Interim where
[1:12:55]
Mike has updated those. And then we've got a list
[1:12:59]
of a number of modifications. All. I would say clarification
[1:13:04]
and updated nature. So that's really the first change to
[1:13:08]
the faqs and to the speaking points. Since they were
[1:13:11]
first penned out of our working groups meeting last week,
[1:13:14]
one of the questions was given the updates and things
[1:13:16]
that have happened. For example, we talk about partners, and
[1:13:21]
there's a rhetorical question. What partners? So we can talk
[1:13:24]
with a little more clarity about the library. We talk
[1:13:27]
a little more clarity about the why. And also reflected
[1:13:32]
to an earlier agenda item provide a little more clarity
[1:13:35]
about the environmental condition of the property. And Steve Cooper
[1:13:39]
gave a good report for us at the working group
[1:13:42]
chairs meeting last week. I think he's going to speak
[1:13:44]
to it here. The other thing that the communications committee
[1:13:49]
is involved in. Is a further leveraging of the current
[1:13:53]
assets. There was a reference here by our first speaker
[1:13:57]
to talk about the timeline. Historical timeline that's. Currently in
[1:14:01]
place on the site. In addition to that, Again, Steve
[1:14:05]
Cooper referencing him. He commissioned a virtual walk through of
[1:14:09]
the property, which is on the website, but it's pretty
[1:14:12]
buried and. We like to do in consult with Mike
[1:14:16]
bytes to leverage a couple of those things to get
[1:14:19]
a bit of social media. Leverage for those and to
[1:14:22]
get a bit of activation for those. Just. As our
[1:14:28]
last. Report there. Thanks to Karen and Herb, who've done
[1:14:31]
a really good job on the partnership. Aspect of arranging
[1:14:34]
some speaking engagements for myself, for Andrew, and also. In
[1:14:40]
addition, The service clubs you spoke to. There was a
[1:14:43]
number of pop ups. Finally. Since this was written. And
[1:14:49]
referenced earlier in the agenda. Andrew has done some work
[1:14:53]
regarding the activation he's created. A form in consul with
[1:14:56]
city staff that it makes it easy and simple for
[1:14:59]
groups that may want to be involved. A pretty easy
[1:15:04]
form. Which Andrews worked on, which we can distribute in
[1:15:08]
the community. Once activation is a goal and we've got
[1:15:11]
a bit of more pathway there. John. Questions for John.
[1:15:17]
Ron. Just a quick one, John, and it's actually to
[1:15:19]
you and to Karen and Herb. I think when you've
[1:15:21]
been talking to the service clubs and groups and so
[1:15:24]
on, has there been anything that's come out that you
[1:15:27]
were surprised at or. You were. Well, yeah. Anything that.
[1:15:32]
That kind of made you go. Yeah, I think so.
[1:15:36]
I think the recurring question is it comes up at
[1:15:38]
the end of every at the end of every presentation,
[1:15:41]
almost without fail. I think that's what you're thinking. Is.
[1:15:45]
This is great. We're really excited with this. I've lived
[1:15:48]
here a long. Time, when can we see something happen?
[1:15:52]
And I think one of the. Levers that happens next
[1:15:57]
after that, or what are the tumblers that roll over?
[1:15:59]
Is the conversations we had at previous meetings about. Okay,
[1:16:03]
we should get something happening. We should get activation there.
[1:16:07]
We have the timeline? Do we do something with the
[1:16:09]
building? Do we take the steel off? Do we cut
[1:16:12]
some trees? Do we cut grass? Do we look at
[1:16:14]
less air? Those are things. That come up in the
[1:16:17]
meetings and they're under consideration as to what the future
[1:16:21]
use. May be is that something a developer would be
[1:16:23]
better to do, et cetera. But I think to that
[1:16:27]
point. That is the overriding response that comes out of
[1:16:30]
those meetings. I'd love to see something there, some indication
[1:16:33]
that there's more than meetings. And I think. That's why.
[1:16:38]
I'm really buoyed by the idea of the animation project
[1:16:41]
and the idea that we activate the place a little
[1:16:43]
bit? Thank you. Hopefully that's helpful. Thanks, John. Anything further?
[1:16:48]
Much? 75 is infrastructure, environment. Steve, would you like to
[1:16:52]
come for. Yeah. Thanks, everyone.
[1:17:02]
I didn't speak up earlier in regard to environmental because.
[1:17:09]
I want to try and put together a bit of
[1:17:10]
a report for the next meeting, and also I want
[1:17:13]
to make sure Taylor. Answered any of your questions or
[1:17:17]
concerns. I think it's really important. What was brought to
[1:17:23]
the group here is just, I think, it would be
[1:17:25]
good for this group to understand what. Some of the
[1:17:30]
restrictions are on the site in regard to environmental concerns.
[1:17:35]
But one thing to keep in mind, this is a
[1:17:36]
brown field, like this is an industrial site. That's being
[1:17:39]
developed. It's not a farmers field that we're plowing into.
[1:17:46]
And taking over farmland. So I think it's really important
[1:17:49]
to develop a brown field in the city. But there
[1:17:53]
are challenges with that. There are always challenges with brownfield.
[1:17:58]
I would like to bring a lot more information to
[1:18:00]
this group and also work with city staff. On making
[1:18:04]
sure that the message and the information we're giving is
[1:18:07]
clear. So I hope to have a better presentation for
[1:18:12]
the next meeting. Or as you've directed staff to do
[1:18:17]
that to fully understand it. There are some really good
[1:18:23]
things about the Strafford site, because the ground in this
[1:18:27]
area. Is very tight. Okay, so most of the contaminants
[1:18:31]
don't go deep. They're shallow, which is extremely important in
[1:18:37]
regard to costs and remediation. And as Taylor highlighted, there
[1:18:43]
are certain areas that are impacted. So a lot of
[1:18:47]
the conversation that we will have in the future, maybe
[1:18:50]
not necessarily today, is kind of a chicken and an
[1:18:54]
egg conversation. Which, what comes first, do we remediate? Now.
[1:19:01]
And spend the money, but we don't know what we're
[1:19:03]
going to be doing. With the site or what the
[1:19:05]
developer is going to be doing with the site in
[1:19:06]
the future. Or do we find out what they're going
[1:19:09]
to do first and then. It's what comes first. But
[1:19:14]
I think in some of the conversations that we've had,
[1:19:19]
I think it is a good point. At this stage
[1:19:23]
to understand some of the restrictions. And what the best
[1:19:26]
use of those areas are. So I'm not going to
[1:19:30]
talk about that today, but I'll promise to bring something.
[1:19:33]
Back to the next meeting. An overarching kind of look
[1:19:37]
at it, and some of our recommendations from the committee
[1:19:41]
that we formed. And I'll make sure I want to
[1:19:44]
have some conversation with staff before I do that. So
[1:19:48]
that there's some unity in what we're presenting. Questions for
[1:19:54]
Steve. Thank you. Thanks so much, Steve. Yeah, thank you.
[1:20:01]
7.6 is working group coordinators. Ray couldn't be here. Alan,
[1:20:07]
did you have anything. They had asked me to raise
[1:20:11]
a couple of issues. One was with regard to. Wanting
[1:20:18]
members of the partnership committee to be able to attend.
[1:20:22]
With Herb and Karen events, and I've suggested that's an
[1:20:25]
internal discussion to have. Amongst that group on how they
[1:20:28]
allocate the work. We continue that discussion. Thank you. Second
[1:20:35]
was he'd asked him if the meeting is returning. To
[1:20:37]
07:00 p.m. But we had explained to him in going
[1:20:41]
to 04:00 we get the full compliment of city staff
[1:20:43]
to be able to be here a lot. Of them
[1:20:46]
without the expense. We are broadcasting these meetings, so unless
[1:20:49]
there is a will of the group. To change who.
[1:20:51]
We want to stay at that timeline now. And the
[1:20:55]
last was just a correction, I believe. Emily, he provided
[1:20:58]
us in an email like it. Was admitted in piece,
[1:21:01]
but I'll follow up on that if there's nothing else.
[1:21:04]
At all I had from the working group. Staff update.
[1:21:07]
Emily? Yeah, I just have a couple of comments, just
[1:21:10]
as a reminder. So these working group reports that. Are
[1:21:15]
now in the agenda package, just a reminder of where
[1:21:17]
they came from. So there was discussion. At this meeting
[1:21:20]
in July about some of the challenges with information flowing
[1:21:23]
back and forth. So the chairs of the working groups
[1:21:25]
in pretty short order, we figured out a template for
[1:21:28]
these working group reports. And people have been whipping these
[1:21:31]
together for the purpose of not just whipping them together.
[1:21:34]
A lot of effort. Go into them. But the point
[1:21:36]
is, we're turning these around quickly, especially. August and this
[1:21:41]
month in September for the benefit. For the committee here
[1:21:45]
to see some of the work that's been going on
[1:21:47]
and for the working group chairs. So I really just
[1:21:49]
want to emphasize that we heard the comments that were
[1:21:52]
made in July about the flow of information. And the
[1:21:55]
working group reports, status reports that people are providing are.
[1:21:59]
In response to that, I also wanted to mention that
[1:22:02]
I did a different format this week. Or this month
[1:22:05]
for the staff update. And I took the work plan
[1:22:08]
that you all approved and went to Councillor in mid
[1:22:10]
August and provided the status or the work update as
[1:22:14]
it relates to those tasks in the work plan, so
[1:22:18]
they're not all strictly things that I personally did. It's
[1:22:20]
a combination of efforts on the city side and then
[1:22:23]
also with members of the. Working groups, so. There's room
[1:22:27]
to figure out better ways of doing this. We are
[1:22:29]
trying to be responsive. So always happy for any suggestions
[1:22:35]
on how you might like to see this information differently.
[1:22:38]
And I wanted to make a point, too. Tonight we
[1:22:40]
took an item that Franklin had questions that he raised.
[1:22:44]
In the context of his working group report and. We
[1:22:47]
made those a discussion item here at the Councillor tonight
[1:22:49]
to be able to delve into. Those. So you'll see
[1:22:52]
that both there's reports from the working groups that are
[1:22:55]
more status reports, and when there are items that need
[1:22:57]
to be discussed, they will come to the committee in
[1:23:01]
the main part of the agenda. A couple of other
[1:23:05]
things. We have our vision and guiding principles going to
[1:23:09]
Councillor on September 23, a week today, so that's the
[1:23:12]
last version that you all worked on that's going along
[1:23:15]
with the community. Insights, a report on the findings from
[1:23:17]
our community engagement that's going forward to Councillor next. Week,
[1:23:21]
and so I'll be sure to keep you posted on
[1:23:23]
when that goes or when that's approved or the comments.
[1:23:26]
From Councillor. And then one last thing Ray had, I
[1:23:31]
think he mentioned is at the last meeting. He found
[1:23:35]
this book really helpful. It's called Valley of the bird
[1:23:39]
tale. He mentioned it. Last month, you may recall. And
[1:23:42]
so he has 20 copies that he purchased. And. Were
[1:23:50]
provided by the author. So I've got a box here
[1:23:52]
and he asked me in. His absence to offer them
[1:23:54]
up to whomever is interested in them. It's called valley.
[1:23:58]
Of the bird tail, an indian reserve, a white town,
[1:24:00]
and the road to reconciliation. So you're. Welcome to take
[1:24:03]
a book if you would like that. I feel like
[1:24:05]
there was one more thing I was going to share.
[1:24:09]
But I'm just really grateful to all the working group
[1:24:11]
chairs in particular for pulling these reports together and for
[1:24:14]
the work that everyone's doing behind the scenes. Like he's
[1:24:17]
saying your things are due. I need them now. I
[1:24:22]
need them. I'm putting out their agenda. So I appreciate
[1:24:25]
all the work that everyone's put into it, so thank
[1:24:28]
you. Thank you. Our next item is under new business,
[1:24:32]
the youth. Representative. And Victoria want to give you update
[1:24:37]
on that. So staff contacted additional applicants. Who originally applied
[1:24:43]
for the position. Unfortunately, they were no longer interested. In
[1:24:48]
that youth representation position. So this fall we will be
[1:24:52]
re advertising the position with the anticipating participation of being
[1:24:56]
able to fill it. But at this time, none of
[1:24:59]
the current applicants were interested anymore. The clerk's office is
[1:25:03]
working. Is there anything further? If not, I'd take a
[1:25:08]
motion to adjourn and our next meeting is scheduled. For
[1:25:10]
October 21 at 04:00 p.m. In the chamber. Uber. Thanks,
[1:25:15]
Franklin. Mark seconded. All those in favor? Thank you.