Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:05]
Okay, welcome to the Tuesday, September
8th select board meeting. If we would uh
[0:09]
we're being recorded. If we rise for the
pledge.
[0:15]
» I pledge allegiance to the flag of the
United States of America and to the
[0:20]
republic for which it stands, one nation
under God, indivisible, with liberty and
[0:25]
justice for all.
[0:29]
Thank you. We'll begin this evening with
the town administrators report.
[0:34]
» Good evening. Thank you. Uh I pretty
brief tonight since I think that we were
[0:39]
together five or six business days ago
the last time. So uh first I wanted to
[0:44]
give an update on the MSBA statement of
interest that we submitted along with
[0:48]
the school committee last year or last
fiscal year in the spring. Uh we had a
[0:53]
visit with the MSBA staff last week. Uh
which means we had made the first cut
[0:58]
for the statement of interest. Um it was
a very informative discussion. We had a
[1:03]
sort of sitdown session around the table
and then walked around middle school
[1:06]
answering questions. We have a couple of
follow-ups that we're putting together
[1:09]
for them. Um but we're excited that we
had made this initial cut and we're
[1:13]
we're having the staff level review.
They will make recommendations to the
[1:16]
MSBA board uh in early December. So
we're looking forward to hearing more
[1:20]
about that. Uh second second piece of
news I wanted to share and I think some
[1:24]
folks have already seen this. Uh EOHLC
uh announced last Thursday funding for a
[1:29]
number of affordable housing projects
across the state and thankfully uh we
[1:34]
were able to celebrate along with BBH
that the funding for the project um at
[1:38]
Veterans Crossing was approved. It's an
important first step uh in moving
[1:42]
forward with the state. We're excited
for the milestone, but there's plenty of
[1:45]
work ahead. So we'll continue to share
updates as they're warranted. Um, third,
[1:51]
probably the only news news I'm sharing
with it with folks is uh in working with
[1:54]
the recck department, we are going to be
building off the success of the World
[1:59]
Cup on the town lawn uh town hall lawn
by piloting a limited number of Patriots
[2:05]
games this fall. Uh we were able to work
out the licensing over the last few
[2:09]
weeks. We're working on the scheduling
right now. It will not be every game. um
[2:13]
probably you know two three or four this
year if that just to see if it's an idea
[2:17]
that will work see how cold it is see
how everyone reacts to it but um it was
[2:21]
such a big success with the World Cup
games that we wanted to see if this is
[2:24]
something we could explore and thank you
to Charlotte and Christina for running
[2:27]
down the licensing on that so that's
exciting there'll be more news on that
[2:31]
as the details are finalized um and
finally just want to share a reminder
[2:36]
that the 911 remembrance ceremony will
be held on Friday uh starting promptly
[2:41]
at 9:55 at the fire headquarters. If
anyone's available to attend, we would
[2:44]
love to have you join us. Um, and that
program will run about 45 minutes. And
[2:49]
with that, I'm happy to take any
questions you all may have.
[2:53]
» Thank you, Nick.
>> So, the
[2:56]
Can you hear me?
>> Just speak loud.
[2:59]
» Okay. Um, does the MSBA um MSBA
discussion that you're having was that
[3:06]
if I remember correctly from earlier
this year that was to be inclusive of
[3:09]
both a uh rehab as well as a
reconstruct. Correct. Just want to make
[3:14]
sure that's still
>> part of
[3:17]
» Yeah, it's renovation or rebuild. That's
something that they we would work with
[3:21]
any designer if we were to move forward
um to figure out what the best option
[3:25]
is. But we looked at it from sort of
both angles as part of the discussion as
[3:29]
a statement of interest indicated we'd
be open to either with the location
[3:33]
staying the same.
>> Okay.
[3:36]
» Anyone else?
>> Could you just remind us what the
[3:40]
in a perfect world which obviously never
happens. Timeline is for when a when you
[3:45]
do these walkthroughs with MSBA if we
are accepted under every you know round
[3:50]
here.
>> Yep.
[3:50]
» What that timeline is because I know
it's rather extensive.
[3:53]
» Six to seven years most likely.
>> Yeah. It's five to seven, but not many
[3:58]
projects are right done in five. So,
it's really a six to seven year.
[4:01]
» And that's for financing to come through
before construction.
[4:04]
» That's the whole that's the whole thing.
Yeah.
[4:07]
» And there's a number of steps throughout
where you know, we would have money for
[4:12]
the feasibility study and design um you
know,
[4:16]
» in advance of the next step. And then we
get, you know, there sort of, the way we
[4:20]
described it last spring was um there's
a number of on-ramps and off-ramps
[4:24]
throughout the process where we ask the
community to take a really active role
[4:28]
whether in voting or in weighing in on
different steps in the process.
[4:32]
» Got it. Thank you.
[4:35]
» Um I have a question on the veterans
housing. Mhm.
[4:38]
» So now that we've we're in the first
round and um Kim Martin Epipstein
[4:44]
actually commented on it that it's very
rare to be able to get that much funding
[4:48]
and support in the first round which
says a lot about our community and about
[4:51]
the project. I think that we need to
work as quickly as possible to start
[4:56]
identifying our process on how we're
going to help the community. And um I'm
[5:02]
going to give you a call and talk about
a couple ways and I think where there is
[5:05]
some extra money in case we need money
to send out mailers and flyers or things
[5:09]
like that. I know that the town um we
give $2,000 a month over to the VFW
[5:14]
right now to support veterans and I
think that'd be a good way going forward
[5:18]
to use that money to help get the word
out to market it and identify it and
[5:23]
» as we move to towards occupancy.
>> Yeah. Okay. Yep. So, and then also, you
[5:28]
know, getting a process in which we put
together a committee that's going to
[5:31]
start, you know, working really hard on
we have over 400 veterans in in town.
[5:36]
So, you know, in town and then also in
Lynn, people who have lived here or in
[5:41]
Salem that have lived here that would
still qualify. And I just want to make
[5:45]
sure we get that ball rolling. And then
the other thing I just want to comment
[5:49]
on last week's meeting. Um when Patrick
came, Patrick came and gave us the
[5:55]
update on uh the shortfall on the
overlay and on the um the fund the
[6:01]
additional care funding. And I have to
tell you, it really it bothered me. It
[6:06]
It's bothered me quite a bit because for
two reasons. One is we never heard a
[6:10]
word about it, not one word until last
week. And I just think that that's that
[6:15]
we can never that can't happen. We have
to the select board and the finance
[6:19]
committee need to be given updates on
what's going on. The fact that over
[6:25]
$200,000 is not being covered by the
federal government. And I know that
[6:29]
there was a lot of comments that
those are, you know, if we were to have
[6:34]
a class action lawsuit, it would be a
lot of legal fees. But I do want to look
[6:38]
into that with other communities. And I
do want to get, you know, Senator Marky
[6:42]
to comment on how is it possible because
during that whole process, we had our
[6:48]
finance director and our town
administrator was was constantly
[6:52]
reporting back to us and working very
hard to spend that money correctly and
[6:56]
going over it over it and over it. And
to now be told that it's not being
[7:00]
covered by the federal government, I I
just can't take that as, oh, okay, we'll
[7:05]
we'll take it. I think one I would like
to see the select board be sent all the
[7:09]
information that was sent to us. Um what
is it we didn't why is it they're saying
[7:14]
we don't qualify. What were the rules?
Because all we did was made sure that
[7:20]
testing was available. And if they're
saying, "Oh, we're not going to cover
[7:25]
you for testing." I I really need to
have a better understanding of why we're
[7:29]
not being tested, why we why we're not
being covered for testing. And then um
[7:34]
on the overlay I the overlay I'll talk
to Patrick so I can get a better
[7:40]
understanding of the overlay but still
the overlay seems a little odd to me
[7:44]
that we had that much of an overlay when
all the tax bills haven't been processed
[7:50]
in the given year. So I just I want to
get a better understanding of that. But
[7:54]
the most important thing is I don't I
don't want to get blindsided again last
[7:58]
minute. So, if you could just put a note
that if there's something outstanding on
[8:01]
a balance sheet, let us know right away.
>> We'll do.
[8:04]
» Thank you.
>> Sure.
[8:08]
» Okay. We will move on to public comment.
Uh public comment is three minutes and
[8:15]
we are going to use this microphone here
because there is no micro. Oh, we're
[8:19]
going to move that microphone to the
stand. Okay. Maybe you could just hand
[8:22]
that microphone to Mr. Dementoto for now
so that he doesn't have to make the
[8:25]
journey.
>> Oh, yeah. Thank you, Joe. Appreciate
[8:29]
that.
>> Does this come out?
[8:34]
» Thank you.
[8:38]
» Good evening, Bill Dementoto,
108 Paradise Road. I am here to
[8:47]
celebrate
the funding of the veterans project
[8:54]
which is close
to everyone who was concerned about
[8:59]
affordable housing in the town of
Swamskitt.
[9:03]
This is the biggest project
since 1971
[9:09]
when Darity Circle was approved for
housing.
[9:14]
The biggest since then
and it's only the biggest because it's
[9:19]
the second other than the 38 unit Michon
school. It is something to celebrate and
[9:25]
I didn't didn't want to miss it.
So much so that I know uh I heard just
[9:32]
heard Mary Allen say
there should be a committee to try to
[9:37]
identify uh veterans who might be
eligible. And I want this board to know
[9:42]
that I am going to form an ad hoc
veterans
[9:49]
committee of five people to seek out
with the veterans agent every veteran
[9:57]
in this town
to find out what their status is and to
[10:01]
see if they are eligible. And I'm I'm
thrilled that there's 41 units that for
[10:08]
the first time I believe will actually
be built.
[10:13]
The naysayers will complain.
[10:18]
They always do. But
thanks to the three members of the board
[10:26]
who were involved in the granting and
the two new members and a new town
[10:33]
administrator and a new town planner,
I think this is going to happen. So,
[10:40]
thank you.
>> Thank you.
[10:44]
Additional public comment.
[10:49]
Okay, I have uh seeing none, I will move
on to one that was emailed
[10:55]
and this is from uh Mr. James Andrews uh
133 Stson Avenue. Uh there are some
[11:03]
links he gives which will be
incorporated into the minutes. So if
[11:06]
you'd like to um see them, please check
out our minutes for at the next meeting.
[11:11]
Uh, dear select board, I'm unable to
attend public comment this evening, but
[11:14]
would appreciate the following be made
part of the public record. On August
[11:18]
27th board meeting, at on the August
27th board meeting, Captain Cable
[11:23]
presented a proposal that would change
parking. During this presentation, he
[11:26]
repeatedly repeatedly referenced the
Wescot property and this was
[11:30]
subsequently described by a board member
as not being a transit property. Per
[11:34]
mass housing financing minutes on 8823,
the financing for this development was
[11:39]
approved on the basis of a transit
oriented development within walking
[11:42]
distance.3 miles point sorry 0.3 miles
of Swampscott MBTA commuter rail station
[11:48]
as well as being served by the MBTA bus
service alongside Essex Street. Uh the
[11:53]
developer own study indicated that the
initial proposal had a 75% shortfall in
[11:57]
the number of required on-site parking
spaces per Swampscott zoning
[12:00]
regulations. According to the TIA, there
are 109 parking spaces proposed for the
[12:06]
128 multif family housing units, which
is calculated to be 0.85 parking spaces
[12:11]
per unit. God bless you. A strict
interpretation of the zoning
[12:14]
requirements would require 192 spaces
based on current zoning requirements
[12:19]
provides the link. Considerable effort
was made by the town and impacted
[12:23]
residents and the developer in 21 and 22
to negotiate a reduction in the impact
[12:29]
of this development. Concessions on both
sides ended up with a parking agreement
[12:32]
and a plan that outlined the following.
Reduction from 120 to 114 units.
[12:36]
Increased on-site parking from 109 to
130. Increased ratio parking became 1.08
[12:43]
spaces per unit instead of 085 spaces
per unit. Easement plan to connect
[12:48]
Pitman to rail trail transit
infrastructure. As a resident, I am
[12:52]
concerned that after two years of
opening, the town has already appeared
[12:55]
to be backtracking on this agreement.
Based on the swamp scout's own zoning
[12:59]
requirements, the failure to maintain
this agreement would lead to an
[13:02]
additional 60 to 70 vehicles competing
for parking on the over congested area
[13:06]
of town. I'm also concerned that if town
is incapable of managing the provisions
[13:11]
under which uh I am also concerned that
if the town is incapable of managing the
[13:16]
provisions under which a controversial
property such as the WCOT was permitted,
[13:20]
then I question whether residents should
trust anything the town says regarding
[13:23]
other reszoning proposals or future
developments. James Andrews. So his
[13:28]
links will be um available in the
minutes
[13:33]
and we will move on to
um the new and old business. Actually we
[13:41]
I would like to consider given the time
to just bump the consent agenda because
[13:45]
we do have one individual who is on the
consent agenda who's here, Kelly Russo.
[13:50]
So, if it would be okay to take the
consent agenda now so that we can allow
[13:55]
Kelly to enjoy her evening without us if
she so chooses.
[13:59]
Um, so the consent agenda includes the
minutes, the entertainment license for
[14:04]
Pomona, Miss Russo, and um Kristen Lewis
uh to climate action and resiliency. So,
[14:12]
I will take a motion.
>> Motion to approve.
[14:14]
» Can I have a second?
>> Second.
[14:15]
» All in favor?
>> Hold on. I have a discussion.
[14:17]
» Oh, go ahead. So, I just I was going to
pull the appointment of Kelly Russo only
[14:21]
because I didn't really think that
having the appointment of Kelly Russo
[14:26]
should be just in a consent agenda. Um,
and the reason I say that is I know
[14:30]
Kelly Russo and she is an incredible
hardworking volunteer for this community
[14:35]
and we are so lucky to have you. So, I
didn't think that you should just be in
[14:39]
the consent agenda, but Sintella, you do
have to get going. Um, I I think it's
[14:44]
we're really lucky to have you.
>> Thank you so much.
[14:47]
Thank you.
>> Thank you. All right. All in favor?
[14:52]
» I I
>> All right. So, we will now move on to
[14:55]
new and old business. Thank you, Kelly,
for joining us.
[14:57]
» Thank you so much.
>> And thank you for your time.
[15:00]
» Thank you all for
>> Thank you.
[15:04]
» All right. We will move on to two
proclamations this evening. Um September
[15:09]
is National Suicide Prevention Month and
the select board makes the
[15:16]
following proclamation. Whereas
September is recognized as National
[15:20]
Suicide Prevention Month, a time
dedicated to raising awareness of mental
[15:23]
health resources and suicide prevention
services available within our
[15:26]
communities. This observation provides
an opportunity to encourage conversation
[15:31]
about mental health and the impact of
suicide, reduce stigma, and the help to
[15:35]
connect individuals and families with
appropriate support and resources. And
[15:39]
whereas suicide remains a significant
public health concern that affects
[15:42]
individuals of all ages and backgrounds,
as well as their friends, families,
[15:46]
co-workers, neighbors, and communities.
And whereas the town of Swampscott
[15:49]
recognizes that every life lost to
suicide has a profound and lasting
[15:54]
impact on family members, friends,
co-workers, neighbors, and the greater
[15:58]
community. And whereas the town of
Swampscott proudly supports those who
[16:01]
work each day in the fields of mental
health, education, public safety, health
[16:06]
care, and community service to provide
prevention, intervention, treatment,
[16:10]
education, and support to individuals
and families. And whereas national and
[16:14]
local mental health organizations and
community partners serve on the front
[16:18]
lines of suicide prevention and mental
health advocacy, working to ensure that
[16:23]
individuals know they are not alone and
that help and support are available. And
[16:27]
whereas stigma surrounding suicide and
mental health challenges can prevent
[16:31]
individuals from seeking the support
they need, making open conversation,
[16:36]
education, compassion, and awareness
essential components of suicide
[16:39]
prevention. And whereas we encourage all
residents to take the time to understand
[16:44]
the importance of mental health and
suicide prevention, to recognize the
[16:48]
signs that someone may need support, to
reach out to those who may be
[16:51]
struggling, and to remember that care
for ourselves and one another includes
[16:55]
caring for our mental health and
emotional well-being. Now therefore, be
[16:59]
it proclaimed on behalf be it proclaimed
on behalf of the select board of the
[17:03]
town of Swampscott, Massachusetts, that
September 2026 is hereby proclaimed as
[17:08]
in the town of Swampscott,
Massachusetts. We inc uh National
[17:13]
Suicide Prevention Month, and we
encourage all residents to join in the
[17:16]
important observation by promoting
awareness, compassion, understanding,
[17:19]
and support throughout our community.
And witness hereof, we here unto set our
[17:23]
hands and cause the cause to be affixed
the great seal of the town of
[17:27]
Swampscott, Massachusetts. this 8th day
of September, 2026.
[17:32]
Um to pause for a moment, just check in
with folks, right? That's really what
[17:38]
this is about. It's about bringing
recognition to um suicide awareness and
[17:43]
to being active members of our
community, checking in with our
[17:47]
neighbors, checking in with our friends,
making sure people have a place to be
[17:50]
heard um so that we can prevent this
from happening to other friends and
[17:55]
family members.
We have a second proclamation
[18:01]
which I'll read unless I have a
volunteer.
[18:04]
I'll read also give you a break if you
want.
[18:07]
» Will you? That would be great. Thank you
so much.
[18:10]
» Sure.
All right. The National Senior Center
[18:13]
Month proclamation by the Swampscott
Select Board. Whereas since 2007,
[18:18]
National Senior Center Month has been
pro celebrated each September as
[18:21]
recognized by the National Council on
Aging and the National Institute of
[18:25]
Senior Centers to celebrate senior
centers across the country and the
[18:28]
important work they do to enrich and
enhance the lives of older adults. And
[18:32]
whereas the Swampscott Senior Center is
committed to fostering an inclusive and
[18:35]
welcoming community for all people and
recognizes and celebrates the diversity
[18:39]
of our community. And whereas the town
of Swampscot supports the rights of
[18:43]
every citizen to experience equality,
dignity, respect, and freedom from
[18:46]
discrimination. And whereas the origins
of National Senior Center Month can be
[18:51]
traced to National Senior Center Week,
first celebrated in May 1979 to
[18:56]
recognize senior centers throughout the
nation and the essential role they play
[19:00]
in supporting old adults, older adults,
and strengthening communities. And
[19:04]
whereas in 1985, President Ronald Reagan
issued the first presidential
[19:08]
proclamation recognizing National Senior
Center Week. And in 2007, the National
[19:14]
Institute of Senior Centers expanded the
OB observance to an entire month,
[19:19]
designating each September as National
Senior Center Month.
[19:23]
And whereas since 2021, the town of
Swampscott has continued to strengthen
[19:27]
its commitment to older adults through
dedicated leadership resources,
[19:32]
programs, services, and opportunities
that support healthy and active aging.
[19:37]
And whereas the Swampscott Senior Center
serves as an important community
[19:40]
resource providing social, educational,
recreational, and wellness programs, as
[19:45]
well as nutritious meals, transportation
services, and opportunities for
[19:49]
connection and engagement. And whereas
the town of Swampscott is proud of its
[19:55]
growing senior community and recognizes
that senior c uh senior centers play an
[20:00]
essential role in supporting the overall
health and well-being of older adults,
[20:04]
particularly by reducing social
isolation, encouraging meaningful
[20:07]
connections, and creating opportunities
for seniors to remain active and engaged
[20:11]
in their community. And whereas
Swampscott continues to envision
[20:15]
opportunities to serve residents of all
ages and generations while recognizing
[20:18]
the important role older adults play in
the strength, character, history, and
[20:23]
future of our community. And now,
therefore, be it proclaimed by virtue of
[20:27]
the authority vested in the select board
of the town of Swamscott, Massachusetts,
[20:31]
that the month of September 2026 is
hereby proclaimed as in the town of
[20:36]
Swanscott, Massachusetts. And we
encourage all residents, businesses,
[20:39]
faith-based, and nonprofit institutions,
community groups, and public
[20:43]
institutions to acknowledge, honor,
value, and celebrate the contributions
[20:47]
of older adults to our community, and to
recognize the dedicated individuals who
[20:52]
serve and support them each day. In
witness whereof, we have here unto set
[20:58]
our hands and cause to be affixed the
great seal of the town of Swampscott,
[21:01]
Massachusetts, this 8th day of
September, 2026.
[21:05]
Thank you, Ted. Appreciate that.
Appreciate all that the senior center
[21:11]
continues to do for our aging
population,
[21:14]
especially our
director ammeritus Heidi Weir and our
[21:20]
current director. So,
we will move on to it is not quite 7
[21:25]
o'clock and that's what we posted. Can I
still go on?
[21:29]
» We have to wait.
>> We have to wait. Okay. So, let's move on
[21:33]
to what can we move on to for five
minutes? Discussion of the
[21:37]
charter commission.
>> It's posted for 6:30.
[21:40]
» It's It says 6:30 on here, but it was
posted in the paper as 7.
[21:44]
» So, I don't want to start it um until
the publicly posted time.
[21:48]
» So, that's why I'm waiting for IRA um to
open. Can we move on to the charter
[21:54]
conversation for five minutes or is it
going to take longer than that?
[21:57]
» I can just speak to it if that's okay.
>> Please. instead of the slides for now.
[22:02]
» Yes. And then we can go ahead.
>> If we even need to do the slides, we can
[22:05]
decide that later.
>> Go ahead.
[22:06]
» Um, so the the purpose of the review is
that there had been a handful of um
[22:11]
folks that expressed interest in looking
at individual parts and pieces of the
[22:15]
charter and trying to understand if the
authorities
[22:18]
um the roles, the appointments and
structures, the budget and capital
[22:22]
process, if everything that we last
agreed on in 2016 is still, you know, in
[22:26]
its appropriate form. Uh I know going
back to the draft of 2001 or 2002, the
[22:31]
idea was that every 5 years, uh the town
would actually be taking a look at it.
[22:36]
In the 2016 draft, we removed that
5-year uh look back. So now here we are
[22:41]
10 years later thinking it's probably a
good time for us to take a few moments
[22:44]
um throughout a year or so to get
together and figure out uh what the best
[22:48]
next steps might be. Um so as I said, it
largely dates from the 2016 revision.
[22:55]
there were not a ton of changes made. Uh
I had some discussions with um Jerry
[22:59]
Perry because he was involved both in
the drafting and at least on the
[23:03]
tangential parts of 2016, but he also
supported other communities in this
[23:07]
effort um at Mass DO to sort of
understand best practices and what's
[23:11]
going on. And also currently, you know,
in the last 18 months, he's worked on a
[23:16]
revision in Beverly as well. Uh
generally speaking, there's a process
[23:20]
that that goes forward. It starts with a
charter review committee. Um in the past
[23:25]
here in town we had gone to town meeting
with an article that would set forth the
[23:30]
charge and the composition of that
committee. It's, you know, between five
[23:35]
and seven people normally. Uh it would
be, you know, if it's at the five person
[23:39]
level, it would like to be one
appointment from you all, one from the
[23:41]
school committee, one from finance, and
potentially two from the moderator, at
[23:45]
least looking at models that have been
used statewide. Uh to put together a
[23:49]
group that would meet with um you know,
committee chairs, committee members,
[23:54]
citizens throughout the course of a
year. Uh, I think when we talked about
[23:58]
timeline last week or two weeks ago when
we when we last met, the question was
[24:02]
sort of how long would we anticipate
this taking? If we were to go forward a
[24:06]
town meeting in December, uh, I would
think that we would be looking at a
[24:09]
12-month process where next December
they would be coming forward. So it's
[24:13]
you know appoint um and appoint the
review body uh establish uh the charge
[24:18]
and scope begin public input then we
move into the meetings with the boards
[24:22]
and committees staff residents and
others uh to identify proposed changes
[24:26]
into the spring of next year. Uh
throughout the spring and summer we
[24:29]
would be categor categorizing the
recommendations and determining the
[24:33]
legal path forward. There's two
different ways to do it. We can make
[24:36]
some changes and it would likely just be
accepted as a home rule petition if it
[24:40]
goes through town meeting. If we make
significant changes, it likely would
[24:43]
also need to go to a referendum. So, it'
be town meeting uh the legislature and a
[24:48]
referendum all that is a decision in a
path we would probably wait to decide on
[24:53]
until we get a little further along next
spring or summer so that we understand
[24:56]
sort of the breadth of what the
suggested changes may be and we can
[24:59]
figure out what would work best and then
we would be coming to town meeting uh a
[25:03]
year from now with that recommendation
and those changes. The other thing a lot
[25:07]
of communities are doing right now is
they're working with outside
[25:10]
consultants. Primarily, the Colin Center
works closely with communities to do
[25:14]
this. I've reached out to them to look
at sort of a draft scope and to
[25:17]
understand what a budget might look
like, making no commitment whatsoever
[25:21]
other than letting them know that we're
sort of looking at this and I want to
[25:24]
understand what that would look like if
we were to partner with them or another
[25:26]
organization that's similar. Um, and
they help both facilitate the process of
[25:31]
public engagement to make sure we're
leveraging um, you know, technology and
[25:36]
things like I know SWAC had done
different um, surveys in town to make
[25:41]
sure that the feedback was broader than
who may show up for a meeting whether in
[25:44]
in person or virtual. Uh, so we would
work potentially with them on on things
[25:48]
like that, but they also have best
practices that they've developed over
[25:51]
the last few years working with
communities. this is one of their core
[25:54]
competencies in support of
municipalities across the state. So, I
[25:59]
don't have the information on pricing in
that yet, but we're looking into that as
[26:01]
well. Um, but I'm happy to answer any
questions. Trying to keep this to five
[26:05]
minutes so that we can facilitate a
discussion uh without stepping on the
[26:09]
IRA time too much.
>> Are there grant opportunities for to
[26:14]
engage with
>> I would look at the community compact.
[26:16]
I'm not certain. I can look into that
though.
[26:19]
Can you help us understand what the
difference is between a committee and an
[26:23]
elected formal charter commission?
>> Well, the appointed committee would
[26:28]
allow it to be, you know, a number of
boards identifying, like I said, if
[26:33]
there was a five participant board, it
would likely be one from each of the
[26:36]
three committees I mentioned. And then
>> the one thing I neglected to say, the
[26:39]
moderator would in the past at least
choose from elected town meeting
[26:43]
members. So, it's not just picking, you
know, someone that has not been engaged
[26:46]
and involved. uh an elected process is
necessarily more political I think than
[26:53]
a process where you know elected bodies
appoint someone that they think is well
[26:57]
qualified to help lead this process for
the community. But at what point do is
[27:01]
there a choice that we can make? Is I'm
just trying to understand the mechanisms
[27:06]
of how this proceeds in terms of are is
it the select board who sets the the the
[27:13]
delivery of how that committee operates?
In other words, I mean there's the
[27:19]
there's state law that dictates a
commission, right? Versus a committee.
[27:24]
at where does the town lie in an
obligation to fulfill that law?
[27:31]
In other words, do we are we forced to
create a commission?
[27:35]
» It it is better to start with the
committee so that you can identify what
[27:39]
the breadth of the changes are. If the
idea was to come back with
[27:43]
» we need to change to a a mayor council
form of government. it would be a
[27:47]
completely different idea than we want
to look at some appointment authorities
[27:50]
to make sure that they best represent
the community in this and that was
[27:54]
really the questions that came up last
spring were really around appointment
[27:57]
authority. It was not a wholesale change
of uh the sort of structure of town
[28:02]
government. It was making sure that what
we're doing now and what we decided 10
[28:05]
years ago still makes sense now um in
2026.
[28:10]
» Does that represent I mean the three
members of the board does that
[28:13]
reasonably represent the conversations
we had in the spring?
[28:16]
» Yeah. Yeah.
>> So, are we gonna come back to this
[28:18]
conversation?
>> We can.
[28:20]
» Okay.
>> Sure. We could table it and then go to
[28:22]
Iraq.
>> Yeah,
[28:23]
» that's fine.
>> All right. So, we will table the rest of
[28:26]
this and we will move on to the Earth
Removal Advisory Committee joint meeting
[28:30]
and public hearing. This hearing was
postponed or was this a new hearing?
[28:35]
Can't recall from
>> new open.
[28:38]
» It was never opened. Great. Uh so uh if
you guys want to open your meeting,
[28:48]
we have to vote to open the public
hearing first.
[28:51]
» So move
>> say
[28:53]
» second.
>> Second.
[28:54]
» All in favor?
>> I now you guys can open your meeting.
[29:01]
» Okay,
>> you're good.
[29:04]
» Okay, great.
>> Thank you.
[29:11]
All right, Joe, you want to take it
away?
[29:13]
» Uh, sure. I when we last uh met on this
this topic, um when you had the permit
[29:20]
in front of you, uh Iraq had uh asked
that you you uh postpone consideration
[29:25]
of its approval because uh the town
earth removal bylaw has a lot of um
[29:32]
conditions that are required to be part
of the permit. And um we did not include
[29:38]
many of those provisions and we felt
that and nor did we address those
[29:41]
provisions that we did not include in
the permit. And because this is the law
[29:46]
of the land, we felt that we necess we
needed to say something about those
[29:50]
provisions of the bylaw that we did not
include in this permit. So the only
[29:56]
difference between the permit you have
in front of you and the one that you had
[30:00]
um when we last met is the fourth
paragraph on the first page.
[30:06]
And it effectively says that um
let me stop by saying that um these
[30:14]
requirements are in uh the earth removal
uh by uh bylaw is article 13 and I'm
[30:21]
specifically looking at section 4 which
is general limitations and under general
[30:26]
limitations
uh there are um it it essentially says
[30:30]
the permit shall include but not be
limited to conditions that address the
[30:35]
following and there are approximately 18
different conditions that need to be uh
[30:39]
addressed. We did not address them all.
And this paragraph explains why not all
[30:46]
of those uh conditions are addressed.
And in large part, it's because they
[30:51]
either are inapplicable,
impractical, impossible,
[30:56]
and and um so we did not include them,
but we also um didn't want to say
[31:03]
nothing about them. And for for example
um in in the bylaw it says that um
[31:11]
the permit shall include conditions that
address type and location of structures.
[31:16]
First of all it's vague. Um second maybe
it refers to a construction trailer but
[31:23]
planning would take care of that. um
once once a project goes through
[31:27]
planning and zoning and the building
inspector does does Iraq really have the
[31:32]
authority to say no no we don't like
those structures we want to put them
[31:35]
elsewhere it doesn't or it shouldn't so
of these uh provisions uh set up
[31:40]
conflict but there if at best they're
redundant but um at worst conflict
[31:46]
another one is uh number seven the area
and depth of excavation again that's
[31:51]
something that's going to be dictated by
the permits that the project has
[31:54]
received
does have the ability or or the board of
[31:58]
select the select board have the ability
to come in and say no no we don't like
[32:03]
that we don't you know we want you to do
instead of 10 feet we want you to do 8
[32:07]
feet even though you have a permit for
10 ft so we felt we had to say something
[32:11]
in the permit that addresses why
that is not a condition in the permit
[32:18]
and many and many others and that fourth
paragraph is what uh accomplishes that
[32:23]
purpose
Um the select board certainly has the
[32:27]
prerogative to say, well, we do want
some of these conditions that that IRA
[32:32]
did not address included. And if we and
if that were the case, there would have
[32:36]
to be discussion and we'd go back and
and and if that were the case, I don't
[32:40]
think IRA would have to approve again. I
think we're at the select board stage.
[32:45]
So changes that you prefer to make, you
you can make. So, uh that's where we're
[32:52]
at. So uh uh you know certainly uh
willing to entertain any discussion of u
[32:57]
every any aspect of the permit. Um I
have nothing really more to present and
[33:02]
and would recommend that the select
board um accept the recommendation of
[33:07]
IRA for the permit for 555 uh Essex
Street.
[33:13]
» Okay. Um I just have a couple follow-ups
to what this new paragraph. Um, are we
[33:21]
considering
the any adjustments to the bylaw post
[33:26]
this permit outside of
>> Yeah. Um,
[33:30]
we we have uh talked about taking a look
at the bylaw uh and presenting
[33:35]
amendments uh for the spring town
meeting.
[33:37]
» Great.
>> So, uh we haven't gotten into that yet,
[33:40]
but uh it's the bylaw. It's it's
there are provisions in the bylaw that
[33:45]
are appropriate for standalone projects
that have a beginning and an end. And
[33:49]
then we have the quarry
>> right
[33:51]
» and there are many provisions here that
just don't apply to the quarry and there
[33:55]
are many that don't apply to a
standalone project. So uh we are going
[33:59]
to be discussing how we can segregate
those
[34:02]
» and clarify them and make them less
vague and um so yes that'll be coming in
[34:08]
the spring.
>> I have a couple questions. one is uh
[34:13]
under four 4D for contaminated soil and
material. How is that monitored?
[34:21]
» Well, I think a lot of the problems with
with forc in the bylaw is that there's
[34:28]
no mechanism to enforce. Uh there's no
penalties if enforcement found a a
[34:33]
problem. So, I don't think it's
practical or realistic to think that
[34:38]
Iraq members are going to be monitoring
going down at the at at project sites
[34:42]
and and monitoring um a lot of what goes
down. Although Tony might I mean uh
[34:52]
» but um
>> but uh we have addressed the um these
[35:00]
issues with with um the project u
representatives and so if you wanted
[35:04]
detail on how that those those items are
being handled I think they are better
[35:09]
position to discuss that. You want to
say something? Could I suggest um I
[35:13]
don't know if you're ready to kind of
give an overview um Andy or Ken or Nick.
[35:18]
I'm guessing you're here to speak on the
project. Could you give an overview of
[35:21]
the scope that this permit is going to
be authorizing?
[35:25]
» We'd be glad to. Just just for the
record, my name is attorney Ken Shutzer.
[35:30]
I'm really here on behalf of the Davis
Company who is doing the construction
[35:35]
Callahan of the project of the 161
residential units. Um the applicant Nick
[35:42]
Manino is the one who was actually doing
the site work and he's be the one who
[35:46]
filled out the application and could
probably give you more of the technical
[35:49]
details than I but we we assembled this
group in anticipation that you never
[35:54]
know what's going to be asked until
you're asked. U we we see the project
[35:58]
coming along. We're very proud of what
what hopefully you've seen and we just
[36:02]
uh as a result of removing more than uh
400 cubic yards of soil. Um we've we've
[36:09]
triggered the point where Iraq is now
involved and clearly you are as well as
[36:14]
the as the permitting authority. So if
you want to direct any questions to Mr.
[36:19]
Manino, I'm sure he'll be glad to answer
them for you.
[36:22]
» That would be great if what's the like
what is the amount of cubic earth you're
[36:27]
going to be moving? What's the like just
give me a 30,000 foot of what activities
[36:33]
we are going to be permitting through
this beyond the fact that you're going
[36:36]
to be moving 450 ft or more offsite.
>> So Nick Manino from Manino Construction
[36:41]
representing uh Callahan and the owner
Davis Companies. Uh the site's a unique
[36:47]
site 555 is it's a big project with 163
units but everyone was familiar with it.
[36:54]
A relatively flat parking lot. There's
not uh we have some we generate
[37:01]
more earth removal sometimes from a a
single family residence than we do this
[37:07]
you know rather big site because our our
cuts and fills are very close. So uh
[37:13]
that's kind of an overview. The short
answer is about a thousand cubic yards.
[37:19]
Um
and uh and fortunately the material that
[37:24]
was put in there when the parking lot
was uh built 30 or so years ago was
[37:31]
hauled down from aggregate industries at
the time. I think it was Lin Sand and
[37:35]
Stone are our our aggregate now
wholesome uh and that's been approved
[37:41]
through
uh through Callahan and the geotechnical
[37:47]
engineers that geoengineering
uh that we have on site to reuse
[37:54]
um most if not all of that material. So,
uh, it's it's a relatively small amount
[38:00]
of material that will leave the site for
such a large site. Yeah.
[38:04]
» How much of the material is moving off
site?
[38:06]
» About 1,000 yards.
>> Okay. Thousand yards. The rest of it's
[38:09]
going to remain on site in some other
Okay.
[38:11]
» Yeah. To give a, you know, comparison,
there was 30 30,000 yards moved off for
[38:18]
the uh, elementary school that was
recently built.
[38:23]
» Thank you. I have a question about the
big dirt pile next to stop and shop. Um
[38:30]
I have had calls from people asking is
it healthy that there's this huge dirt
[38:34]
pile down in our area here and um and
there so I have had concerns about
[38:41]
whether or not that's a health hazard or
whatever kind of issues might come of
[38:46]
that. So and it says here in the permit
that it gets sprayed down um etc. But is
[38:52]
it being sprayed down on the weekends or
is that how is that being monitored?
[38:57]
» So the the material we have a water
truck on site and it is sprayed down
[39:03]
regularly. Uh it it isn't and we have
worked in there on an occasional
[39:08]
Saturday for a little bit but uh for the
most part no it's not sprayed down but
[39:13]
it's also not dug and moved around on
Saturday. So, it's usually when we're
[39:19]
digging into the material and and
loading it. Um, we're we're adding to
[39:24]
that pile as we dig foundations and then
we're removing from that pile as we back
[39:29]
fill the foundations, you know, creating
as much of a balanced site as we can.
[39:34]
So, it's it's as we're moving it around
the site, tracking around with heavy
[39:39]
dump trucks and loaders that you tend to
kick up the dust and and need to keep
[39:43]
the site wet to minimize um minimize the
dust, which is the real problem. And uh
[39:50]
the loom pile that was there was hydroed
and the the earth pile that's there
[39:56]
that's being reused is wet regularly
certainly when we're digging into it.
[40:00]
» Great. Makes sense.
>> Thank you. So I I have a question about
[40:03]
the the Japanese notwheat part of this.
I know this was discussed in prior Iraq
[40:07]
meetings. Um can you give us an update
as to how you're managing that actively?
[40:11]
Has it been moved off site? Is it is it
separately identified? And I thought
[40:16]
there was conversation recently about
hydro seeding the Japanese not weed pile
[40:22]
which doesn't necessarily aid in its um
what's the word I'm trying to find? Uh
[40:28]
diffusion into the environment. Can you
talk a little bit about what you're
[40:32]
doing with with that?
>> I'll let Mike from Calan talk to it.
[40:41]
» So, the the pile of lom that was hydro
seated is also the pile that the
[40:46]
Japanese not wood grew in.
Um, we've hired a consultant who has
[40:52]
come up with a rough plan on how to
treat it. And at the same time, we
[40:57]
covered it with tarps today to help as
it starts to flower this fall, minimize
[41:03]
how much of it could spread to other
properties.
[41:07]
But the gist of the treatment would be
to cut it, spray it with a pesticide in
[41:14]
the end of September, beginning of
October this year, and then next year
[41:19]
cut it in June and spray it in September
as well.
[41:26]
» Okay.
>> Thank you.
[41:33]
» And I'll add something to that. It it
looks worse now because it's all in one
[41:38]
spot,
>> but it's actually a lot easier for the
[41:42]
control of it, whether it's covering it
with tops or treating it. It was spread
[41:46]
out all along Essex Street, and it's a
real problem u on on a lot of sites, you
[41:52]
know, throughout the town and the state.
So, we're it's it's a bit of of a
[41:57]
learning curve for all of us, but the
fact that it's in one condensed pile is
[42:00]
making the treatment plan a little bit
easier. And so when you do use
[42:05]
pesticides because the drainage area
does go straight to the ocean is there
[42:09]
consideration of making sure that there
is no again diffusion of the product
[42:14]
into the into the basin.
>> So there that has been
[42:19]
that was discussed with the consultant
we were talking about which is why he's
[42:24]
still going back and forth on a final
written plan of okay I'm going to use
[42:28]
this pesticide or this one. And I think
that's part of the um part of what he's
[42:35]
looking into.
>> So you really don't have a plan.
[42:38]
» Could you have the people speak up?
>> Sure. I'd be glad to have the people
[42:43]
speak up. Could you just speak into the
microphone so it circulates through the
[42:47]
room?
>> Thank you.
[42:50]
So, I was saying um that's part of the
consultant's issue right now is that
[42:54]
he's going back and forth and making
sure whatever pesticide he decides to
[42:58]
use doesn't cause any environmental
issues.
[43:06]
» Okay.
Additional questions outside of the
[43:10]
notweed?
[43:13]
I'm seeing none,
>> we will move on to a motion. Motion to
[43:18]
close the public hearing. Is that what
you're looking for?
[43:21]
» Do we have to any public comment?
>> We will end the public hearing first and
[43:24]
then take the motion after.
>> I was asking if we do public comments.
[43:30]
» We do have public comment as part of the
public hearing. Is do any of the public?
[43:36]
» Anybody online?
>> No.
[43:37]
» Nope. Thanks for the reminder. Looks
like we're good.
[43:42]
» So, we have a motion on the table to
close the public hearing. Can I have a
[43:45]
second? Ted. All in favor?
>> I
[43:48]
» I Okay, we will now move for a motion.
>> Motion to approve the public. Motion to
[43:53]
approve the permit.
>> Second.
[43:55]
» All in favor?
>> I.
[43:58]
» Thank you all.
>> Thank you very much. Thank you for
[44:00]
joining us and for the information.
[44:06]
» We will move on to the Kleinfelder
report. We did receive some an email
[44:13]
from the public asking us to speak very
clearly into our microphones because it
[44:17]
is difficult to hear even online. So if
we could get very close like a rock star
[44:23]
as Joe said that would be helpful to
them.
[44:26]
» Can you make me present?
[44:33]
» Thank you Iraq. Thank you.
[44:42]
All right.
[44:47]
» There's another microphone there if you
want to.
[44:49]
» Who does that?
>> Who?
[44:51]
» Trying to do it for me right now.
[44:56]
» So, I can share the slides.
[45:01]
» Okay. Maybe you guys could start while
we try to pull the slides up.
[45:06]
» Sure. Um, I guess I'll just make an
opening comment. This is David Peterson
[45:10]
with Kleinfelder. Um we do have a three
different companies that kind of worked
[45:16]
on this as well as a bunch of folks from
the town. So I just want to make
[45:19]
acknowledgements and we also have um
representatives from Mallister Marine
[45:24]
Engineering here and Woodsole Group as
well as Kleinfelder. So I want to
[45:27]
acknowledge the consultant team. Um so
Brandon Raymond is to my left from
[45:32]
Woodshole Group, Seth Bryant from
Kleinfelder and then on the um screen
[45:36]
there is John McAllister. Hopefully we
can get the technology work that he can
[45:40]
speak. Um and so um you know we were um
first brought together to work on this
[45:48]
coastal resiliency plan um focused
specifically on Fisherman's Beach. Um
[45:53]
Doug Thompson I think was the you sort
of the the force behind it from the
[45:57]
select board originally and um you know
so it it it started from there.
[46:01]
Originally we were pursuing some grant
funding for the project. Um we were
[46:06]
unfortunately unable to uh get the grant
but we were very happy that the town
[46:10]
proceeded with a lesser scoped project.
Um, and one of the themes and
[46:17]
recommendations of this is, you know,
because we had to cut the scope down and
[46:21]
the cost down, um, we didn't have much
of a public outreach or any real public
[46:25]
outreach piece at all, that's going to
be a really critical part of, you know,
[46:29]
any future steps. Um, and we have a
slide about that later. Um, so in terms
[46:34]
of the the the last slide, which I'll
just talk about it now because we don't
[46:39]
need to wait till the end. um in terms
of who was involved in the town. So um
[46:44]
Marsy Galaska and Tim Milikin um were
part of it. Gino Cresta, Martha Schmidt,
[46:50]
Liz Smith, Jackson Schultz, Tadoulie. So
we had a variety of um meetings and
[46:55]
input um from town officials and and
committee members. Um but you know,
[47:00]
lacking is like a really at large um you
know, public outreach campaign, which is
[47:05]
something that we we know will need to
um happen in the future.
[47:09]
Um, so, um, the technical team is
everyone who's not me. So, um, I know
[47:16]
you guys want to hear from, um, you
know, Seth and and Brandon and John. So,
[47:20]
I'm going to turn it over to Seth who
will facilitate the rest of the
[47:23]
presentation.
>> Shannon, are you able to take John off
[47:27]
mute
>> or at least allow him? Oh, he's off.
[47:31]
Okay, he's good. Okay, thank you. Never
mind. You're good.
[47:34]
» Is he able to speak? Do we know? Did
that technical hiccup tested?
[47:38]
» Okay.
>> Oh, okay. How you doing? You want to
[47:39]
try?
[47:42]
» Nope. We can't hear him.
>> We can see you talking, but we cannot
[47:46]
hear you, sir.
>> Let's uh keep going and maybe
[47:53]
somebody else can act like his voice.
>> Yeah, we're prepared to cover his
[47:56]
content.
>> Thank you. We'll come back if we can get
[47:59]
it to work, but let's go a different
direction.
[48:01]
» Yeah, he's a few slides in, so
>> Okay, good.
[48:03]
» Perfect. Has a little bit of time. Um,
sure. So to get started um just a quick
[48:09]
agenda. We'll give some background on
the project. Uh the aim of this project
[48:12]
was both to look at what is the
vulnerability for Swamp Scott on the
[48:15]
coast uh particularly around Fisherman's
Beach. Um so we'll start with that
[48:20]
vulnerability assessments and then move
into an alternatives analysis uh where
[48:24]
we dug in and looked at what type of
solutions might be appropriate for the
[48:28]
coast to protect um your town from
flooding in the future. Um from there uh
[48:33]
Brandon and Wood which whole group
worked on some modeling to show um what
[48:37]
the benefit of some of these solutions
might look like. Um then we'll move on
[48:40]
to recommendations.
Next slide.
[48:45]
Um so just real quickly to give some
background on what your coastal
[48:48]
vulnerability looks like, we looked at a
range of scenarios um for various
[48:53]
climate horizons. So looking at 2030,
2050, 2070, looking with sea level rise,
[48:59]
um how the risk might change moving
forward. Um I have just a snapshot here
[49:03]
of what in 2030 the projected coastal
risk is. Um so this shows the
[49:08]
probability in a given year that these
areas might flood. Um and you can see
[49:12]
the dark blue on the left over by Kings
Beach right on the Lind border um has a
[49:16]
highest probability extending inland.
Um, and then the focus of this project
[49:20]
was around Fisherman's Beach, um, which
you can see there's a number of flood
[49:24]
pathways that really, um, go pretty
pretty deep into town, past Puritan Road
[49:28]
and Humphrey Street. Um, so even though
it's a it's a small sliver coastline,
[49:33]
it's relatively low position. Um, means
that flooding happens, it's a flood
[49:37]
pathway that could infect a much broader
area. Um and in the report which um is
[49:43]
currently in a draft form and I know
we've provided to um select board as
[49:47]
well as the committee working on it um
we go through and identify all of the
[49:52]
town assets that are at risk of flooding
um with a probability that they would
[49:56]
flood in a given year. Um so just
highlighted here the fish house, the
[50:00]
police station and um the Humphrey
Street pump station. Um that's three
[50:04]
town owned facilities kind of right in
the center of that fisherman's beach
[50:09]
flood pathway.
Uh next slide.
[50:14]
Um so as part of this project we also
looked at um the compound risk of both
[50:19]
coastal flooding. So that last one was
looking at a coastal event. So think um
[50:24]
coming in from the coast, waves, storm
surge, things like that. Um but we also
[50:28]
looked at what the risk was from extreme
rainfall um
[50:33]
compound with the coastal risk. Um so
here is an example of one scenario we
[50:38]
looked at. um where there's a relatively
high tide, but not one that would cause
[50:43]
flooding on its own. But if that were to
occur when a large precipitation event
[50:46]
happened, in this case a 25-y year um
return period event, and you can see um
[50:53]
the areas at flood risk are similar. Um
what happens if there's a large storm
[50:57]
event that comes in when there's high
tide? Um this whole area drains to the
[51:00]
ocean. So you have reduced capacity in
your storm water system. Um, so there's
[51:05]
there's flutters present just from the
combination of high tide and rainfall
[51:08]
and not being to drain out. Um, so just
wanted to point out that this was also
[51:13]
part of the analysis. Um, and then on
the right there, I've just showed um
[51:17]
with climate change what the expected
risk is looking like to change for
[51:21]
Swans. Um, you can see just the bar
chart there um how the 100red-year storm
[51:27]
or the 1% probability in a given year.
you can see from now until 2070 um a
[51:33]
pretty large expected increase. Um so
that's kind of the risk that we were
[51:37]
looking at.
>> Um
[51:40]
» can I ask please
>> a question? So I just have uh
[51:44]
» a quick question because my
understanding is this report this report
[51:48]
was done to update the last report that
we had. Right. Correct. So we had that
[51:53]
last report now this is the update on
this one. The last report it said that
[51:56]
we were most most vulnerable in the
Humphrey Street area by the police
[52:01]
station and the um pumping station. And
now is this report saying that we're
[52:06]
most vulnerable uh at the fish house?
>> So the fish house um
[52:13]
is is in that same zone. I we we did
rank everything from vulnerability. Um I
[52:19]
think the the police station and the
pump station were still the highest. Um,
[52:23]
but the fish house is a low point in the
area that acts as a flood pathway. Okay.
[52:26]
» Um, so it's a critical one we wanted to
address as well.
[52:29]
» And then what about over here over to
the left? Because that's in dark blue,
[52:33]
the one that's
>> like on Phillips Park.
[52:36]
» Yeah.
>> Yep. So that area had the highest
[52:40]
probability of flooding under these
future projections.
[52:42]
» Right. So this is what's confusing me is
the is this a change?
[52:46]
» That's King's Beach and
>> going into Lynn, I think, right?
[52:49]
» Yeah. On the left says Scott, right?
Correct. Yeah, I just don't
[52:53]
» that's Pearl Street.
>> Not sure what that is there. I think I'm
[52:56]
just trying to get clarity on uh the
difference in the reports from the first
[53:00]
report to this report. Is it is it a
different situation now or is it
[53:06]
» Yeah. So, so we we relied on updated
modeling completed by Woods Hole Group.
[53:10]
Um and in that left area by Kings Beach,
there was an expansion in the area.
[53:15]
Okay.
>> Um that is looking like it could be
[53:17]
prone to flooding in the future. Um,
so we've we've added in assets over
[53:25]
there and um catalog streets at risk of
flooding and their probability in the
[53:29]
report. Um, so those are new additions.
Um, that's correct.
[53:33]
» Um, when we looked at flood mitigation,
we focused on fisherman's speech because
[53:37]
that was the scope of the project. Um,
but
[53:41]
there that's correct that those other
areas are at risk too,
[53:46]
» right? I guess I guess my understanding
from the meetings were the scope of the
[53:50]
project was to update our update our
vulnerability study. I didn't I I didn't
[53:56]
walk away thinking it was fisherman's
beach. I thought it was the entire the
[54:00]
the previous to update the previous
study.
[54:02]
» Yeah. No, you're right. The the
vulnerability and the the extent of
[54:06]
flooding was updated for the entire
coastline of the town,
[54:09]
» but the mitigation aspect and like the
alternative analysis was focused
[54:13]
specifically on Fisherman's Beach. that
was deemed to be the not by us by the
[54:17]
town that was deemed to be the highest
priority segment to look at first.
[54:20]
» Okay.
>> Um it actually has like quite a lot of
[54:24]
assets, town owned assets, you know,
critical facilities inside that that
[54:28]
zone. So, it made sense to us,
>> right? But would it would it be fair to
[54:31]
say that the most critical asset that we
have would be the pump station? If we
[54:35]
lose that pump station, what happens to
the town?
[54:39]
» We have no way to
>> I know.
[54:42]
Is it
>> Yeah, but if you look
[54:45]
» I guess if you look at this Go ahead.
>> is what I've gathered from this is the
[54:51]
entry points for the uh coastal flooding
are along Fisherman's Beach, Iceman's
[54:56]
Beach, Wales Beach, that whole area is
the entry point for the flooding that
[55:00]
would
>> through elevation change and rainfall,
[55:04]
you know, sink to the darker blue areas
that are inland. Is that correct? Yeah,
[55:08]
there's there's a small number of finite
entry points and then they'll basically
[55:12]
flood a large inland area. So, kind of
the point of this is to try to protect
[55:17]
those vulnerable points of entry, right?
So,
[55:19]
» so you mitigate the pathways in order to
prevent flooding across the whole area.
[55:23]
That's what say
>> y
[55:29]
skeptic.
>> Well, yeah, I am a sk I'm going to tell
[55:31]
you right now. My biggest worry is the
pump station. You know, I understand,
[55:36]
you know, well, the whole area,
>> I'm a little familiar with the area, so
[55:40]
the whole area has me concerned, but
that pump station and where are we most
[55:45]
if you said where are we most
vulnerable? We're vulnerable right
[55:48]
there.
>> Right.
[55:49]
» Correct me if I'm wrong because if we
lose that pump station,
[55:52]
» we we lost it in 2011.
>> We flooded it in 2011,
[55:56]
» right?
>> Yeah.
[55:58]
» Right. and the the flood pathways we're
trying to address as the alternatives
[56:03]
assessment looks at cutting off flooding
to that area where the pump station is.
[56:08]
» Yeah. I at the end of your presentation
you've got the modeling for the proposed
[56:12]
solutions, right? That take away that
>> flooding risk.
[56:15]
» Yeah.
>> Projected. Great.
[56:17]
» Yeah. I think those will help.
>> Great.
[56:21]
» Um let's move on to the next slide.
Um so we we assessed a large range of
[56:27]
alternatives looking at cutting off
these flood pathways particularly for
[56:31]
fisherman speech. Um we looked at um a
range of criteria and assessing those to
[56:36]
try to come up with an objective way to
cut some and move others to the top. Um
[56:40]
we worked with the committee that Dave
mentioned representing various
[56:44]
committees in town in order to come up
with um what we would prioritize and we
[56:50]
have the full list of criteria here.
I'll just point out that the ones that
[56:54]
um were decided to be the most important
were the effectiveness of the solution
[56:58]
at the capital cost and then stakeholder
acceptance. So um how it affects
[57:03]
residents and the community in the area.
Um but we did assess every alternative
[57:07]
that we'll be talking about against all
of these criteria uh to come up with a
[57:12]
composite score and those scores were
used to rank the alternatives we'll talk
[57:16]
about. Um so if we move on we can dive
into what those were that we looked at.
[57:21]
Um so we broke the coastline into three
segments based on um kind of distinct
[57:27]
attributes of each one. Uh so on the far
left we have the fisherman's beach
[57:32]
parking lot area uh which is relatively
lowlying and potential flood pathway um
[57:37]
owned by the town. Um to the right we
have the Puritan road area. Um we
[57:42]
separated this one out because it's a
little distinct because it's mostly
[57:45]
privately owned. It's currently
protected by private seaw walls. Um, and
[57:49]
then lastly, we looked at the fish house
as its own alternative um, just because
[57:54]
there are a lot of historic
considerations with it being um, a
[57:56]
nationally listed uh, property um, right
in the mix of the flood zone. Um, and
[58:03]
then lastly, we had a few other
alternatives we looked at that were kind
[58:05]
of beyond those um, that included a
living breakwater in the harbor itself
[58:10]
um, as well as other solutions like tide
gates and storm water pump stations.
[58:15]
Um so if we move to the next slide. Um
after our initial analysis using the
[58:21]
criteria we discussed we did a high
level analysis and we we cut some right
[58:25]
off the bat. Um so these included
elevating Humphrey Street and Puritan
[58:30]
Road. Uh we found that these just
weren't feasible because of the
[58:33]
elevation you would need to get to um
connecting to driveways. It it just
[58:37]
wasn't really a possibility. Um and we
eliminated the living breakwater just
[58:43]
due to high costs. Um and it it wasn't
the most effective solution to provide
[58:49]
flood protection for the coastline. Um
so what that left us with um we looked
[58:55]
at within the parking lot area um
elevating the parking lot itself um or
[59:01]
doing strategic retreat. So removing the
parking lot and replacing it with
[59:04]
something more like a dune, a a
naturebased solution, something that
[59:08]
could protect behind it. Um along
Puritin Road, we looked at the
[59:13]
possibility of augmenting or raising the
existing seaw walls that are already
[59:17]
there to provide a cohesive barrier to
flooding. Um and we also looked at
[59:22]
building up the beach in front of the
barriers and um again making a dune. So
[59:27]
a more nature-based solution. And then
lastly, at the fish house, we looked at
[59:31]
flood proofing the fish house, raising
it, relocating it, um or fully replacing
[59:37]
it. Um and we'll get more into that
later. Um and for all of these, we are
[59:41]
looking at a design flood elevation of
13 ft. Um so that's 13 ft above sea
[59:46]
level. Um for reference, the ground
elevation there is at about 10 ft. Um so
[59:51]
this is about think right at the fish
house, just everything would be 3 ft
[59:54]
above the existing ground level. Um
that's kind of what you need to protect
[59:58]
too to make sure um that these storms we
were looking at wouldn't wouldn't flood
[1:00:02]
beyond the coastline.
>> What's the reason to design to 13 ft? Is
[1:00:07]
there a statutory or is that best
practice or what's
[1:00:10]
» So we we used um the resilient mass
action team's guidance which is from um
[1:00:15]
EA um and their recommendation for this
type of flooding was to look at the the
[1:00:20]
2050.2
probability storm event. Um so 0.2% 2%
[1:00:25]
chance it happens in the end of the year
in 2050 with sea level rise. So a fairly
[1:00:31]
conservative estimate.
>> Okay.
[1:00:33]
» Um so that projected elevation the peak
one for the coastline that was 13 ft.
[1:00:38]
» Okay. Thanks.
>> You said the current um elevation of the
[1:00:42]
parking lot is what?
>> Uh 10 ft.
[1:00:44]
» Okay. So if there is there is a
barricade around the parking lot, right?
[1:00:49]
There's jersey barriers.
>> Jersey barriers.
[1:00:51]
» That's not effective enough. You have to
like I mean it's not a barrier but it's
[1:00:56]
barriering.
>> Yeah. So so we one of the options was
[1:00:59]
looking at replacing it with a more
permanent seaw wall. Okay.
[1:01:02]
» Um and it has to be built to be able to
withstand wave action. So
[1:01:06]
» need something behind it.
>> Yeah.
[1:01:07]
» Got it.
>> When we talk about going back to the 13t
[1:01:10]
question when you're talking about
storms and wave driven storms you can
[1:01:13]
get significantly above that. What is is
for some, you know, I is 13 ft really
[1:01:18]
enough or is that just the mean sea
level rise that you're worried about as
[1:01:22]
opposed to impact of windblown storms?
>> So, hurricanes,
[1:01:28]
» those are No, it's looking at the um and
maybe Brandon can speak to this one
[1:01:33]
because he did work, but
>> hi. Um yeah, thanks. Um yeah, my name is
[1:01:36]
Brandon Raymond. I'm a coastal engineer
with Woods Hole Group. Thank you very
[1:01:39]
much for having me and thank you Client
Felder for including us on this
[1:01:42]
important project. Um to answer your
question about the 13 ft what that
[1:01:47]
represents is what we call still water
elevation. So this is the combination of
[1:01:51]
tides and storm surge wind driven storm
surge. Uh what it does not include is
[1:01:56]
the influence of wave runup up onto a
beach or something that might be over
[1:02:00]
topping a seaw wall or something like
that which is tends to be something that
[1:02:04]
handle is either if you're not
protecting against it you're usually
[1:02:07]
accounting for it in drainage of catch
basations and things like that but
[1:02:11]
ultimately that's uh the 2050.0 zero no
2%
[1:02:16]
» basically the five what we call the
500year event is so it's by 2050 so
[1:02:22]
that's including sea level rise and then
of course the statistical analysis to
[1:02:26]
get us that
>> so the term still water is a little
[1:02:28]
counter u intuitive
>> still water and the yeah I guess you're
[1:02:32]
right yes to it
>> yeah oh that's why I was asking the
[1:02:35]
question because I was a little confused
when I saw that I when I saw the word
[1:02:38]
still water I thought it was
>> what it really means is so it's the so
[1:02:42]
it's the influence of tides wind driven
storm surge and then also um what we
[1:02:46]
call wave setup. So anytime waves are
breaking at the shoreline, that
[1:02:50]
turbulence actually raises up the water
level just to hair. And so when you add
[1:02:54]
all that up together, you get a still
water elevation at the shoreline. Okay,
[1:02:57]
great. Thank you.
[1:03:02]
» Thanks, Brandon.
Um
[1:03:07]
any more questions on this one before we
dive into these areas?
[1:03:13]
I just I I did want to go back just uh
back to the page where you had the
[1:03:17]
analysis piece of this where where did
the waiting come from?
[1:03:21]
» Um we did a workshop with um the
representatives from the town on the
[1:03:26]
committee that Dave mentioned um where
we provided that these were the criteria
[1:03:31]
that we were planning to look at um and
we worked with them to develop if we
[1:03:34]
were missing any and then they went
through and waited um their priority for
[1:03:38]
those.
>> Okay.
[1:03:39]
» So none of this was was our thoughts. It
was um reflects what the town thinks.
[1:03:48]
» Does this match plus or minus what you
see other communities doing in terms of
[1:03:52]
waiting like efficacy, social
acceptance, and capital cost? Are those
[1:03:56]
what most communities kind of rate
highest?
[1:03:58]
» Uh definitely. Yeah. I And I mean
effectiveness, efficacy is we want a
[1:04:04]
solution that's going to be effective.
So
[1:04:05]
» 100%.
>> Definitely agreed that that should be
[1:04:08]
the top one.
>> Thanks.
[1:04:12]
Um, I think we can move on to the next
slide.
[1:04:16]
» Um, so the first area is the Humphrey
Street and Fish House parking lot. I
[1:04:20]
think John was going to take this one.
Um,
[1:04:24]
» yes. Can you guys hear me now?
>> We can. We can.
[1:04:28]
» Thank you, John.
>> All right. We're good. All right.
[1:04:29]
» Welcome, John.
>> Well, thank you everyone. Sorry for the
[1:04:32]
technical diff and not being able to be
there. But John Mallister, Mallister
[1:04:35]
Marine Engineering, again worked with
the team on this uh specifically looking
[1:04:39]
at the parking lot here. Um what we
looked at once we got into this analysis
[1:04:45]
really four separate options as you can
see on the slide. Um one and three kind
[1:04:50]
of go together where it is um
essentially augmenting what's there for
[1:04:55]
existing infrastructure
by a raising of permanent seaw wall
[1:04:59]
that's designed be probably reinforced
concrete but it's designed to resist uh
[1:05:04]
wave action and hydrostatic pressures
that would be forced from additional um
[1:05:10]
water rising. Um, on the option one, you
would have that along the front side of
[1:05:17]
the beach or on the south side of the
parking lot, if you will. And because we
[1:05:20]
want to maintain access, you kind of
have to design for the norm and for the
[1:05:24]
storm, you would have to augment uh the
three openings for the boat ramp, the
[1:05:31]
stairs down, and the um the other access
all the way to the west. They have to
[1:05:36]
augment that seaw wall with deployable
barrier. Um, important to note the the
[1:05:44]
uh parking lot isn't perfectly flat
elevation. It does range its lowest in
[1:05:49]
the east by the fish house where it's
about 9.8 and it actually rises up to
[1:05:53]
about 11.2
uh all the way to the west and at Chesan
[1:05:57]
Park which is over kind of to the the
park just to the west of the facility is
[1:06:01]
actually above elevation 13. So we don't
have to do any interventions there. It's
[1:06:04]
actually a natural barrier that we can
build off of and connect into that. Um,
[1:06:09]
so I'm going to skip to option three.
Uh, it's a similar strategy to what
[1:06:13]
option one was. Uh, except it'd be on
the back side or the north side of the
[1:06:17]
parking lot. And, um, what's attractive
about that is there's already a little
[1:06:22]
curving little wall there. It just have
to be brought up about uh, 2 to 3 ft
[1:06:27]
higher. It could be made nice. You
could, you know, it would have to be
[1:06:30]
reinforced concrete again to withstand
the hydrostatic pressures, but you could
[1:06:33]
do some stamped stones on it, make it
look aesthetically pleasing. And then
[1:06:37]
you only have two um two areas you have
to close off on just the entrance into
[1:06:41]
the into the parking lot and the exit.
Um those areas would just need to be
[1:06:46]
deployed in advance of a storm because
usually these things are forecast and
[1:06:50]
you have some time. So Gino and his crew
would have to get out there and deploy
[1:06:53]
these barriers to seal it off and then
once the storm is passed and was
[1:06:58]
receded, you can take that down and
stuff can go back to their normal
[1:07:02]
operation. Uh then the other two options
we looked at were on two uh options two
[1:07:08]
and four and those both involved raising
the grades within the parking lot
[1:07:12]
itself. So number two um is raising it
and keeping it as a parking structure, a
[1:07:18]
parking area I should say, but bring it
up to elevation 13. Now, in order to do
[1:07:22]
that with grading, you kind of have to
peek it in the middle, uh just right
[1:07:26]
down the center of the parking lot up to
elevation 13, grade it back down to
[1:07:30]
Humphrey Street, and grade it back down
on the other side to um to the beach.
[1:07:36]
difficulty for that is for the the boat
launch. Uh if you're coming up off of
[1:07:41]
Humphrey Street at around 9 and a half
10 up to 13 and then back down to launch
[1:07:47]
your boat, it's
for, you know, for a high clearance
[1:07:52]
vehicle, it's not an issue, but when
you're trolling with a trailer, you have
[1:07:55]
that pinch point on the trailer, it
could it could cause some issues,
[1:07:58]
especially because you have to come in
and back down to launch the boats. So,
[1:08:02]
there is some challenges associated with
that. Um, and the other issue is you're
[1:08:08]
relying on the fish house to to provide
some of that the connection to the fish
[1:08:13]
house, I'm sorry, to provide some of
that uh continuous wall of the elevation
[1:08:17]
13. So, by going up to elevation 13 in
the middle, you essentially be losing a
[1:08:21]
couple of blockers most likely or some
other um some other impact to the fish
[1:08:26]
house. But again, I think uh Seth and
his team going to talk about that a
[1:08:29]
little further on, but this just one one
option to point out. And then option
[1:08:33]
four that we looked at is a similar
thing that instead of going with a
[1:08:36]
parking lot be removing the whole
infrastructure of parking and going with
[1:08:41]
a a naturebased solution which would be
doom. So you could take that out you
[1:08:45]
would build it up with sand dredge out
some sand place on the on the um on the
[1:08:52]
shore seed it you'd have a more natural
reinforced um area. it would be set
[1:08:58]
through freezing. We still have the
issue of uh the connection over at the
[1:09:02]
fish house and there's a lot of
maintenance associated with that
[1:09:06]
especially early on when you're trying
to get it established. Uh if we can go
[1:09:09]
to the next slide please.
[1:09:13]
So um as as we mentioned we kind of
looked at the different impacts what
[1:09:17]
factors would in uh would
give us the best desired outcome for
[1:09:22]
what we're looking at. uh no no option
is cheap, no option is is bulletproof.
[1:09:29]
You know, there's challenges, there's
drawbacks, and there's positives for
[1:09:31]
each one. Uh but what we ended up going
with um based on these cost estimates,
[1:09:37]
you know, in today's dollars, obviously
things are fairly valuable lately and
[1:09:42]
you know, planning forward, you you have
to put in a goody factor on any
[1:09:47]
budgetary figures, but in today's
dollars, that's what we're looking at.
[1:09:50]
But what we think is the most effective
is actually unfortunately the most
[1:09:55]
expensive, which would be that flood
barrier along the um along the back edge
[1:09:59]
along Humphrey Street on the north side
of the parking lot. Uh because it has
[1:10:04]
minimal impact on circulation.
Uh, in fact, use it won't really affect
[1:10:11]
use in the parking area because it's
only about a two and a half, three foot
[1:10:14]
wall
and uh it doesn't affect activities and
[1:10:19]
operation of the fish house because it
just ties in naturally with it. So
[1:10:23]
that's uh what we're uh looking for. So
if we go to the next one, it's actually
[1:10:27]
a better visualization of it. The next
slide. Yeah. So this blue line here you
[1:10:32]
could see would be that that solid wall
that would be put in um between the the
[1:10:38]
the sidewalk and the parking area. Raise
up to elevation 13 be 2 to 3 ft high.
[1:10:45]
You'd obvious have to uh reinforce the
foundation be a little bit of excavation
[1:10:48]
work and then those red area lines which
would be the areas of deployable
[1:10:53]
barriers which would be tied in um in
advance of a storm when they're
[1:10:57]
announced. So, you would lose, you know,
a day before most likely each storm,
[1:11:00]
you'd lose access to the beach. Uh, but
no one's really going there because
[1:11:05]
these storm events are, you know, public
safety issues. So, you want to t block
[1:11:10]
that off anyways, but you'd lose those
two access points and then they' be
[1:11:13]
taken down and you could go back to
normal operations, but the only
[1:11:16]
permanent infrastructure would be that
that blue line.
[1:11:20]
» Um, so these have Yeah,
>> just a quick question. And these
[1:11:24]
deployable flood barriers are like what
you would see like at the mouth of
[1:11:28]
Winthrop or something. They're like big
heavy metal
[1:11:32]
» like gates that come out. Is that what
we're talking about?
[1:11:35]
» There there's multiple options. Okay.
>> So there are some that are that that
[1:11:40]
fold up. There are some that are just
actually sandbags almost like they have
[1:11:44]
like reinforced you just fill them up
with sand.
[1:11:46]
» Um
uh there's multiple options that you
[1:11:49]
could put at uh and review. option did
you quote cost
[1:11:55]
» which I actually took uh we got three
quotes and we just used the the average
[1:12:00]
cost
>> for the different
[1:12:02]
» but what was the option technologies
>> which solution
[1:12:04]
» which solution did you quote sorry
>> uh I so I quoted the the sandag option
[1:12:10]
and the um I don't know how you call
them they're kind of like
[1:12:16]
» um the ones that pop up the hydrostatic
ones that
[1:12:19]
» they're like the base pops up like this.
If you can see me in the the water flush
[1:12:24]
with the ground and then they pop up.
Correct.
[1:12:26]
» Yeah.
>> Is that right?
[1:12:28]
» Yes.
>> Yeah. That's like a That's not a
[1:12:30]
deployable one, but it's the same idea.
They So, they they sit flat like this
[1:12:34]
for storage. They can be stored on a
pallet and they put them out there and
[1:12:38]
they just go they open up like this, but
Yeah. They're not like in place per
[1:12:41]
primarily like that.
>> Yeah.
[1:12:43]
» Okay. So when we're looking at the
choice here, right, because the one on
[1:12:49]
Humphrey Street is several feet higher
on average,
[1:12:52]
» right, from the lowest position of like
9 and 1/2 ft or roughly. So we talk I'm
[1:12:58]
going go back to, you know, the original
question I had before which was the 13T
[1:13:03]
which encounters storms, waved driven
action and so on. What is the by 2050
[1:13:08]
and 2070 the expected
king tide sea level rise? Where are we
[1:13:16]
in at the point of a daily king tides? I
know not every day but you know at the
[1:13:21]
highest of high tides where are we at a
regular
[1:13:26]
flooding risk issue that does not
account for storms?
[1:13:30]
» How high?
>> I'll defer to Brad on that do you know
[1:13:33]
off the top of your head?
the top of my head. No. Um, but I mean,
[1:13:36]
we're talking about
>> I'm second. Sorry. Uh, I mean, so we're
[1:13:41]
comparing what a 500year storm to a to a
high tide. So, I I don't have those
[1:13:47]
numbers off the top of my head, but I
imagine there's quite a difference.
[1:13:51]
» The reason I was asking is that one is a
response to an incoming storm or
[1:13:57]
something that is projected or expected.
The other scenario is something that
[1:14:02]
happens on a regular daily basis,
weekly, monthly basis. Something that
[1:14:08]
you you kind of want a permanent
structure there. So that's why I was
[1:14:11]
asking the difference of why wouldn't
you put it down at the beach as opposed
[1:14:15]
to
up higher. I mean, it kind of sets the
[1:14:18]
table for
all of the solutions we're looking at.
[1:14:23]
Mhm. Well, well, sir, I'm sorry, just
one more question uh thing about so the
[1:14:28]
that 2% annual exceedence probability
with a 500year storm is basically saying
[1:14:35]
any given year that water would be met
or exceeded point has a 2% chance of
[1:14:42]
occurring.
>> So really what we're talking about is
[1:14:45]
you know how frequently are is that
flooding going to be occurring. So the
[1:14:49]
the king tide if you will is going to be
obviously almost greater than it's a
[1:14:54]
it's a 100% certainty that it's going to
occur any given year. So that's that's
[1:14:59]
the kind of a measure of the difference
between elevations.
[1:15:02]
» Wait to say it another way then we are
planning for 98
[1:15:08]
99.8%
of water with 2% is what you're like we
[1:15:16]
are like 99.8 8% of the time we'll be
fine and it's only the 2% that we are
[1:15:22]
planning for right now.
>> Correct.
[1:15:24]
» Cuz I like
>> elevation 13 though. So
[1:15:28]
» I mean there's
>> I think to Wayne's point um we did check
[1:15:33]
just the normal tide range that's
expected with sea level rise and there
[1:15:36]
is no sunny day flooding expected. Um
>> let let me put this at
[1:15:41]
» sunny day flooding was the word I was I
was trying to think of. Yes, but that
[1:15:43]
was that was why I was asking the
question. Sunday flooding. John, you are
[1:15:46]
very well aware and familiar with our
harbor and kind of the tide cycle. So to
[1:15:51]
Wayne's point,
>> we get a bad flood, we get a bad
[1:15:55]
southwesterly. I know you've seen the
photos of kind of what happens.
[1:15:59]
» Does this projected solution without
those deployable flood barriers put in
[1:16:05]
place, but the fixed structural ones
help remedy
[1:16:10]
that damage?
So you have to look at as a total
[1:16:15]
solution. I think that's we're going to
get to later. It's what if there's one
[1:16:18]
weak point, if there's one area where
water can get in because water's going
[1:16:22]
to find its easiest path. So if there's
one area in this whole connected part
[1:16:27]
that is lower, uh, whatever you do, it's
not going to stop it. So you have to
[1:16:31]
kind of have a a whole line of defense.
And you go from elevation 13 to
[1:16:35]
elevation 13. And I think they'll show
that a little bit later on of of why
[1:16:39]
there are several pathways in that you
have to address each and every pathway
[1:16:42]
because even if you just hit these ones
here, uh it can go around and get it and
[1:16:48]
get in there very easily and you'll
still have it on the back end. It'll
[1:16:50]
come and float around from the back end.
>> Okay,
[1:16:54]
» go back one slide.
>> All right, so
[1:16:59]
the recommended solution is in red,
right? And the the first solution
[1:17:06]
basically is similar, right, in terms of
benefits and drawbacks, challenges, and
[1:17:12]
it's about $100,000 cheaper. So why why
this solution? Why is this a better
[1:17:18]
option?
[1:17:21]
» Because uh that one has a lot more of a
maintenance burden on it, the front edge
[1:17:26]
one. So, it's going to be a lot more
work to to um to get them installed
[1:17:32]
because if you're working on the back
end, it's easier to picture you're
[1:17:35]
putting in these deployable barriers
because you have to have like a seal
[1:17:38]
along the bottom. It's easier to seal on
asphalt than it is on a beach.
[1:17:42]
» Okay.
>> So, we have to make those and it it
[1:17:45]
» the one that says raise seaw wall along
beach edge doesn't list anything in
[1:17:49]
drawback challenge in terms of on andm
or anything like that. So that's why I'm
[1:17:53]
asking it has the exact same drawbacks
and challenges and benefits as the
[1:17:58]
highest scoring solution. Do you see
what I'm saying?
[1:18:03]
» So I'm just trying to find out there's a
$100,000 difference there. Why why that
[1:18:08]
more expensive solution is the
recommended. Do you know do you want to
[1:18:11]
yeah
>> getting at see my point there?
[1:18:14]
» I think that comes out
>> because your benefits and your drawback
[1:18:17]
are the exact same, right?
>> The only thing you have different is
[1:18:19]
estimated cost and alternative. It's
just not detailed enough.
[1:18:23]
» Yeah, it's just maybe some upkeep is
also the uh drawback and challenge
[1:18:27]
should be listed there,
>> right? The
[1:18:29]
» Yeah, but like the life cycle cost on it
would be higher
[1:18:32]
» except for $100,000 different.
>> John, is it fair to say that the reason
[1:18:35]
why that wasn't pursued is because the
ongoing maintenance of that requires
[1:18:39]
more work and more capital expense to
maintain that for the sameish benefit?
[1:18:46]
» Absolutely. Well, cuz if if you guys can
if you look at the winter profile of the
[1:18:50]
beach versus the summer profile, you
notice that there's a lot more of the
[1:18:53]
beach exposed um during the low season
when the sand washes out. So, if you
[1:19:00]
have a storm coming when that sand's out
there, you have to adapt how you're how
[1:19:03]
you're tying in those three points. So,
it's a little bit more of a challenge to
[1:19:07]
deploy and maintain it. So, that's
absolutely right that that there is a
[1:19:10]
longer term life cycle cost for it. I
have to assume there's a similar life
[1:19:14]
cycle cost to the dune replacement
because like there's a lot of upkeep
[1:19:17]
related to well first we have to create
the dune and then we have to make sure
[1:19:20]
there's enough sand for it to be
effective right so there's an upkeep
[1:19:24]
involved
[1:19:27]
» yes but they are natural there's like a
the first maybe 10 years they're going
[1:19:31]
to be the most intensive but once the
dune is established
[1:19:34]
» okay
>> outside of a major storm event these
[1:19:36]
dunes are pretty resilient
>> okay
[1:19:41]
So the as as you're showing this
relative to the fish house which is a
[1:19:45]
separate part of the presentation right
by stopping the flooding at the beach
[1:19:50]
side though don't you do a better job of
protect pro protecting the rest of the
[1:19:54]
fish house and thereby I don't know
maybe not having to
[1:19:59]
you know the cost offset of having to
protect the fish house relative to doing
[1:20:03]
it just up front towards the water. Does
that make sense? If I could draw it out
[1:20:08]
I do that. I actually think if we don't
do this in concert with a fish house
[1:20:12]
option that you're just locking the fish
house in the water,
[1:20:16]
» right?
>> That's why I'm
[1:20:17]
» so we need to have a fish house option
that either elevates it, moves it, fix,
[1:20:22]
you know.
>> Well, I'm saying if if you had it if you
[1:20:24]
had a if you had the barrier closer to
the water, you can put a contiguous line
[1:20:28]
around the fish house as opposed to
pushing it back then trying to draw a
[1:20:32]
wall around the fish house coming down
and then moving along the water towards
[1:20:36]
the rest of the beach.
Yeah, I see your point. Let's maybe we
[1:20:42]
can move on.
>> Let's see what the other
[1:20:44]
» Yeah, the other solutions
>> and then I is it fair to say that
[1:20:47]
there's more detail in the final written
report
[1:20:50]
» that answer some of the questions final
decisions between different
[1:20:55]
» many volumes of pages.
>> We have full um descriptions for each of
[1:20:58]
those like 12 criteria for each
alternative. Um
[1:21:01]
» Okay.
>> Sorry, we were just summarizing for all.
[1:21:03]
» No, no, I'll perfect.
>> Do you want me to go to the next slide?
[1:21:06]
» Yes.
>> Yes. Can we actually skip to the C to
[1:21:09]
the fish house solution since we were
just talking about the fish house and
[1:21:13]
then we'll go back to Purton Road if
that's okay.
[1:21:15]
» Yeah, definitely.
>> So for the fish house we looked at four
[1:21:20]
broad options. Um so flood proofing the
existing structure. Um so this could be
[1:21:25]
done in a couple ways. Uh wet flood
proofing is where you allow flow to go
[1:21:31]
into the structure itself. So you have
vents in the structure and this allows
[1:21:35]
the water level to equalize. Um so
remove some of the hydrostatic pressure.
[1:21:40]
This is actually what FEMA recommends
for the the zone that the fish house is
[1:21:44]
located in. Um we had a lot of concerns
because it's a historic structure.
[1:21:48]
Having it be wet constantly would be
probably not good, but it is one we
[1:21:51]
looked at. Um dry flood proofing is
probably more of what you're thinking.
[1:21:55]
So making the structure itself um fully
impermeable. And then we also looked at
[1:22:00]
just having temporary barriers
surrounding the whole structure. So
[1:22:04]
similar to what John was talking about
and for our analysis we assumed they'd
[1:22:08]
be drop in flood planks. So where you
have posts and you kind of drop and
[1:22:12]
hammer in um wide steel plates ahead of
a storm. Um we looked at relocating the
[1:22:18]
fish house. Um so preserving the
structure itself, moving it elsewhere.
[1:22:23]
Um and replacing the structure with
either a dune or just a barrier. um but
[1:22:29]
reusing the space for flood protection.
Uh we looked at replacing the fish
[1:22:33]
house. Um and then we also looked at
elevating the fish house or raising it
[1:22:37]
three feet so it was above that flood
elevation.
[1:22:40]
Um so next slide. Oh, sorry if you could
go back. Um and we just have a mockup
[1:22:46]
here. Um all of these options would have
to tie into the section that John was
[1:22:51]
talking about, right? Um so for the
recommended approach of having a barrier
[1:22:56]
along Humphrey Street, um you can see
that we'd have to cover where the red
[1:23:00]
hatched
>> um section is. That would be where
[1:23:04]
there'd be a deployable barrier and it
would tie into whatever solution was
[1:23:07]
done at the fish house.
[1:23:11]
» Um so we have a large table here, but
this is the three iterations of flood
[1:23:18]
proofing that we just talked through. um
relocating the fish house, replacing and
[1:23:22]
elevating it. Um there were a number of
aspects that we looked at with this one.
[1:23:28]
Um because it's a working fish house, we
we were thinking about how it would
[1:23:33]
affect commercial fishermen because the
storage lockers along the first floor.
[1:23:37]
Um we thought about the National
Historic Register listing because some
[1:23:41]
of these would cause you to lose that
status. Um which I know is important to
[1:23:45]
some. um we have to think about
uh permitting of it because it is within
[1:23:50]
a high velocity zone under FEMA. So this
is I know we're kind of focusing in a
[1:23:56]
small area, but this is a much more
complicated one just because of the
[1:23:59]
nature of the building. Um so try to run
through this fast, but wet flood
[1:24:04]
proofing. Um
we really ended up not being in favor of
[1:24:09]
this one just because um the first floor
of the building is all storage lockers
[1:24:13]
for fishermen. And then in order to do
this one, they'd be having to clear out
[1:24:17]
their space ahead of a storm. Um there
could be damage to the structure over
[1:24:20]
time, even if the structure is not being
washed away just because of wetting and
[1:24:24]
then drying. Um so even though it's a
FEMA recommended one, we don't think
[1:24:28]
it's appropriate for this historic
structure. Um dry flood proofing is
[1:24:32]
tricky just in the number of openings
there are to the existing structure. Um,
[1:24:37]
and because the structure is historic,
it's probably not designed to withstand
[1:24:40]
the wave action that we'd expect to see
that close to the coast. Um, so also not
[1:24:46]
a recommended approach. Um, temporary
flood proofing. Um, this is one that we
[1:24:51]
think could work for the area. Um, this
would be advantageous in that it's
[1:24:56]
relatively cheap. You just have to buy
these temporary barriers.
[1:25:01]
um they could be set up in advance of
storms um around the structure as long
[1:25:06]
as there's a foundation built for them
to connect to. Um it also wouldn't
[1:25:12]
affect the historic designation and are
relatively quick to implement. Um
[1:25:16]
disadvantages is you you'd have to be
prepared. You'd have to go out ahead of
[1:25:20]
a storm to do this. Um
>> and they're temporary because they're
[1:25:23]
removable, not because they only have
one usage.
[1:25:26]
» Correct. Yep. You would store them Yep.
somewhere in between storm events.
[1:25:32]
Um, relocating the fish house. Um, this
would obviously eliminate all concerns
[1:25:38]
for the house itself. You'd retain the
historic structure. Um, however, you
[1:25:42]
would lose a national historic register
listing because that listing is tied to
[1:25:47]
its location along the coastline as a
working fish house. Um, it would also be
[1:25:52]
costly and you'd have to acquire land to
move it to. Um, in talking with
[1:25:56]
stakeholders, this was one that was not
recommended. Um, replacing the fish
[1:26:03]
house
um, at a first floor elevation above
[1:26:07]
that 13.0
ft. Um,
[1:26:11]
this again would be challenging to
retain historic designation um, even if
[1:26:15]
you retained the structure. Um, and then
lastly, we looked at elevating the fish
[1:26:22]
house. Um, so this one would be um
raising the house 3 ft, building a new
[1:26:27]
foundation below it that acted as a
flood barrier. Um, we'd still have those
[1:26:32]
deployable barriers from the area John
talked about that would tie directly
[1:26:36]
into the new foundation. Um, build a new
ramp system around it, so you'd have
[1:26:41]
access to the storage lockers for the
fishermen. Um
[1:26:45]
and
um so this one is one that would be
[1:26:50]
consistent with the National Historic
Register listing. So you could actually
[1:26:54]
maintain that. Um and it is feasible. We
talked to a contractor in the area who
[1:26:58]
does this. Um it would just be probably
by far the most costly. Um so we did
[1:27:03]
cost estimates for the two that really
seem feasible in this. Um came up with I
[1:27:08]
think 60 560,000 for the temporary flood
proofing. Um and 2.4 4 million for
[1:27:14]
raising the fish house. Um, so pretty
dramatic difference. Um, but again, it's
[1:27:19]
it's talking about a temporary a
solution that requires manpower versus
[1:27:23]
one that allows the fish house to be
resilient on its own. Um,
[1:27:28]
» I know that was a lot of information.
So, any questions?
[1:27:31]
» Did you guys consult with the um
commercial users to see if elevating it
[1:27:36]
would be feasible?
>> Yes,
[1:27:38]
» we did. Yeah, we met with Ted and um
John Engles, I believe was his name.
[1:27:43]
» Yeah.
>> Um part of the solution because of the
[1:27:46]
ramping system would broaden the
footprint of it. The fish house would
[1:27:49]
have to be moved slightly to the side.
Um and you would lose one of the two
[1:27:53]
boat ramps. But talking with John, um it
seemed that only one of them is current
[1:27:57]
» he's now joining.
>> Go ahead.
[1:28:00]
» Uh only one of them is currently in use
anyways. So that wasn't um a deal
[1:28:04]
breaker.
>> Okay. So really there's one solution,
[1:28:08]
right? Out of the six you've got listed
here, there's really the temporary flood
[1:28:12]
proofing is your recommendation. Is that
what
[1:28:15]
» Well, I guess there's two if we want to
spend $2.4 million,
[1:28:19]
» right? Sure.
Uh I guess I would like go back to one
[1:28:24]
of my earlier like first comments was
that this study didn't lack the public
[1:28:28]
process and this is obviously a an asset
that has means a lot to a lot of people
[1:28:34]
and people look at it different
differently even within our like
[1:28:37]
committee there were different opinions
as to like you know what this building
[1:28:41]
could or should be right so if you're
going to spend $2.4 4 million to protect
[1:28:46]
an the commercial interests of you know
a small select number of fishermen like
[1:28:51]
some people in town like may or may not
be moved by that and others that's
[1:28:55]
absolutely critical to their livelihood
right so um I I think bringing in
[1:29:00]
broader perspectives and bringing this
through a public campaign would be very
[1:29:04]
helpful in terms of like decision-m I
don't think you can make a decision
[1:29:08]
based on where we are today right so I
just wanted
[1:29:11]
» right I think that that's the piece that
is kind of our wheelhouse house, right?
[1:29:15]
Is that that relationship with the
public and understanding what their
[1:29:19]
feelings are?
>> Absolutely.
[1:29:20]
» I think we'd, you know, um trust you to
give us the actual technical
[1:29:26]
recommendations and let us handle the
>> the kind of, you know, stakeholder
[1:29:30]
alignment and all that. So, that's kind
of what what I'm thinking anyway.
[1:29:35]
» Yeah.
>> And I will say all these solutions are
[1:29:37]
aimed at protecting the fish house. Um I
think regardless of which solution you
[1:29:42]
go with, you can that barrier can be
built behind the fish house. Um you can
[1:29:47]
provide protection for the whole town.
You can just have a three-foot wall
[1:29:50]
behind it. Um so this kind of can
function independently.
[1:29:56]
» Um so this is not necessarily a risk to
the whole town. It's just really what do
[1:30:00]
you want to do about this building?
>> Thank you.
[1:30:03]
» I guess regardless of what we decide for
the fish house, we need to do something
[1:30:06]
about Puritan Road though. So we want to
go back to zone B.
[1:30:12]
» Yes. Thank you. Yes. Um, so zone B,
Puritan Road, my colleagues were kind
[1:30:17]
enough to give me the most politically
sensitive stretch of shoreline to talk
[1:30:21]
to. So, thank you. Um, I say that
because obviously we include several um,
[1:30:28]
private properties along the stretch of
road that are that are right right at
[1:30:31]
the waterfront. And so the alternatives
that we uh, assessed here um, were there
[1:30:40]
were technically four. They're
[1:30:44]
They're basically two, but essentially
we have a a wall either be it either a
[1:30:52]
steel sheep pile wall or a concrete seaw
wall
[1:30:56]
uh or a beach and dune combination. Uh
one of them being a 30ft um width of
[1:31:04]
beach or you might you might hear me
call it a burm sometimes. uh that's the
[1:31:08]
flat part of the beach that people
recreate on or a 10- foot wide burm
[1:31:12]
which obviously is a either these both
of these are very narrow beaches, right?
[1:31:17]
Um so we took a look at each one of
those the cross-sections on the previous
[1:31:21]
slide. I probably pointed out a little
bit um that shows you kind of the
[1:31:26]
alignment that we would be looking at.
>> John
[1:31:29]
» is now exiting.
>> I was boring him to death apparently.
[1:31:34]
» All right,
>> don't take it personally. We don't
[1:31:38]
Um so all of this is on private
property. There is the existing seaw
[1:31:42]
wall that's there now that is privately
owned. It's built of um you know just
[1:31:47]
stone. So we would be either reinforcing
that building just immediately in front
[1:31:52]
of it or or building up or elevating uh
portions of it to a consistent uh
[1:31:58]
elevation. That's the other thing. The
consistent elevation is really important
[1:32:01]
here because these are private walls
that have been built, you know, hundred
[1:32:05]
years ago maybe. Um, they're all at
different elevations and so we want to
[1:32:10]
make sure that's a nice consistent, you
know, that 13 ft magic number that we've
[1:32:14]
been talking about.
So if we go back to the the next slide
[1:32:20]
um so when we compare them um from
benefits and and challenges or drawbacks
[1:32:25]
the the nature-based solutions um you
know the beach dune and um burm
[1:32:32]
combination has um the benefit of being
a nature-based solution and and not just
[1:32:38]
nature-based for naturebased sake but
also uh opens up for grant opportunities
[1:32:42]
a lot of times that you can find
opportunities through CCM and um and
[1:32:46]
others that can that are more
lenient towards uh greenbased solutions
[1:32:52]
as far as grants uh for funding and
construction. Uh the trade-off there of
[1:32:56]
course is that there is an O and M uh
need and after large storms we would
[1:33:01]
have to go back and and place sand to
reinforce that template. That is sort of
[1:33:06]
the the what we'd call the design
template.
[1:33:10]
Um the 30-foot beach is basically the
same flavor except that when as far as
[1:33:18]
longevity is concerned, the wider the
beach, the longer uh it's going to stay
[1:33:22]
there. So erosion is sort of an
everpresent pressure at the shoreline.
[1:33:26]
So um you just buy you buy yourself a
little bit more time.
[1:33:31]
The two versions of the seaw wall are
basically the same as far as what um you
[1:33:38]
know the drawbacks are concerned and the
benefits that they provide. The only
[1:33:41]
real difference is the material cost and
we find that sheep pile seaw walls are
[1:33:46]
tend to be more expensive just because
of the price of the steel or or if you
[1:33:49]
put composite in there that might be
make it more expensive.
[1:33:53]
So of those four options we landed on
the raised concrete seaw wall as the
[1:33:58]
highest scoring solution. Um and uh
let's see if we go one more slide
[1:34:04]
please. Uh this is just sort of what
that alignment would look like um in
[1:34:10]
theory. And so these can you know this
sh this could shift a little bit. We're
[1:34:13]
more or less trying to follow the
existing alignment of the the seaw wall
[1:34:16]
that's there now. So we're trying to
minimize the amount of you know
[1:34:20]
construction that would need to take
place. And of course uh this would
[1:34:23]
require some sort of buy in from the
folks that live there right. Um,
[1:34:29]
so that is uh that that lead that that
is zone B. Um, if we could skip to
[1:34:35]
» I just have a quick question.
>> Oh yeah, sure. Of course.
[1:34:37]
» Because it's a uh we'll call it a public
private partnership with if we um raised
[1:34:44]
the seaw wall and made it one contiguous
um concrete structure.
[1:34:52]
Um, number one, are we allowed to do
that without
[1:34:58]
p without the private property owner's
permission? I would assume we are not.
[1:35:03]
» And if we do do it, how do we put the
onus on the property owner to maintain
[1:35:09]
it if we paid for it? Like, are we
liable for its failure? Are we what is
[1:35:15]
what are the legal ramifications of
>> the town doing it?
[1:35:19]
I don't know if I can speak to that
intelligently. I can guess, but I don't
[1:35:22]
want to put myself.
>> Okay.
[1:35:26]
Take could take the seaw walls
>> by an agree agreeable eminent domain.
[1:35:31]
» Are you offering?
>> Yes, I would offer that. Um, but you
[1:35:36]
have to you have to understand that some
of the seaw walls are owned and then
[1:35:40]
percentage of the beach is owned in
front of it. So, it's not just the seaw
[1:35:43]
wall, but it's also the land on the on
the on the beach side. So, some of the
[1:35:48]
properties are a little bit different,
but
[1:35:50]
» yeah,
>> they're not all like that though, right?
[1:35:52]
» No, they're not all like that. So,
>> but a lot of most of them, I would dare
[1:35:55]
to say, are.
>> Yeah. Mhm.
[1:35:57]
» So, that would be regardless of which
approach here we would take or could
[1:36:01]
take,
>> they would all have some component of
[1:36:04]
going on private property.
>> Right.
[1:36:06]
» Right. So, I I think legally that could
all be worked out. I would I would think
[1:36:11]
that if you're presenting something that
would benefit the town by raising that
[1:36:16]
and locking up water coming out onto
Puritan Road and coming out at the end
[1:36:22]
of Puritan Road and also by on the left
side there protecting the fish house,
[1:36:27]
» right?
>> By sealing something in there, that
[1:36:29]
would be a major benefit to that whole
area.
[1:36:31]
» I mean, it's mutually beneficial to all
of those property owners and their
[1:36:35]
property to prevent the flooding. So, I
would assume that there would be sort of
[1:36:39]
a quidd proquo.
>> To your point about maintenance, and I
[1:36:43]
can only speak from personal experience
owning one of those little parcels
[1:36:46]
» on the map here that it's not on a seaw
wall, but right in front of it. Um, most
[1:36:51]
of the folks I know over here maintain
their own seaw walls. So, it would be
[1:36:55]
» you'd be changing the height of the
maintenance, right? But
[1:36:58]
» they're already maintaining it to some
to varying degrees.
[1:37:01]
» Okay.
>> Yeah. One of the things we've learned
[1:37:02]
here though is though, you know, the
smallest uh uh break or the smallest ch
[1:37:08]
weak link in the chain exposes the
entire town to
[1:37:11]
» and and the rest of that entire
community particularly to flooding.
[1:37:16]
» Yeah,
that's interesting.
[1:37:19]
» It's I would love to understand KP's
position on that.
[1:37:23]
» Okay, we can look into it. Does do any
of these solutions require pilings that
[1:37:29]
need to go down towards bedrock just to
keep them secure from the hydraulic
[1:37:35]
forces of of
the ocean?
[1:37:38]
» Uh we haven't done that level of design
here. Um I can tell you that typically
[1:37:43]
these sort of projects don't there you
you need to assess for scour and make
[1:37:49]
sure that you're protected down to the
design level of scour at the toe of the
[1:37:53]
structure. or so have you picked
>> scour means just for
[1:37:56]
» is that's you know it's a fair question
um as waves are are kind of battering a
[1:38:01]
wall if you will um the where the wall
meets the sand at the at the toe of the
[1:38:07]
structure that has that will that
elevation will lower will drop down over
[1:38:12]
the course of a storm because that wave
energy has to go somewhere and so what
[1:38:18]
it will do instead of breaking your wall
it eats out the the turbulence eats out
[1:38:22]
the material at the bottom of the wall
and what usually a rule of thumb we'll
[1:38:26]
say is um the design wave height in
incident to the wall is typically what
[1:38:32]
we would expect for a depth of scour for
that sort of structure. So if you say
[1:38:37]
like a 3-ft wave or is it just the right
number out 3ft wave then you need to
[1:38:41]
make sure that your wall is at least 3
feet plus probably a little bit of bonus
[1:38:45]
down below the depth of sand so that
you're able to um withstand that scour.
[1:38:51]
Um geotechnical engineers would take a
deeper look at that uh no pun intended
[1:38:56]
to uh figure out how much further down
they would need to go just to make sure
[1:39:00]
that the uh structure was not going to
>> topple over from the dirt.
[1:39:03]
» You don't think it would have to go all
the way down a bedrock though?
[1:39:06]
» I don't expect so. No.
>> John, from your past piling experience
[1:39:11]
here, that was pretty pretty deep,
right?
[1:39:15]
» Yeah. So the the violence the bedrock is
really for vertical forces because
[1:39:20]
you're you're transferring that load
downward. Here we got forces coming at
[1:39:24]
us horizontally. So you're more you have
to have a wider foundation base. First
[1:39:29]
of all, it's a concrete structure.
You're not going to have to do that. But
[1:39:31]
you probably have a wider footing with a
keyhole in it to prevent over topping of
[1:39:35]
the wall and again prevent against that
scour. So, I think you'd have to worry
[1:39:39]
about going bedrock because Yeah. Well,
it's it's pretty variable in there, but
[1:39:42]
I don't think you would get deep enough
to get to that and you wouldn't have to
[1:39:45]
deal with those forces.
>> Okay. Thanks.
[1:39:48]
» So, what you're recommending here is
you're recommending making the seaw wall
[1:39:52]
go down uh by the entrance there and
then putting in deployable flood
[1:39:58]
barriers all the way along the side. But
are you also recommending increasing
[1:40:03]
that the height of the seaw wall
that's up against Puritan road on here?
[1:40:09]
» We took a look at that actually. I think
it was high enough already to meet that
[1:40:13]
design flood elevation. So
>> yeah, when I asked you guys this when
[1:40:17]
you presented this to our stakeholder
group, you had said that was like I want
[1:40:19]
to say 13.2. It was like just over
because visually I was thinking well how
[1:40:24]
does that relate?
>> And based on the conversation that we
[1:40:27]
had, it was pretty similar. Great.
[1:40:32]
» Uh, so let's see if we skip ahead to
slide 19.
[1:40:38]
Oh, perfect. Thank you very much. Um, so
this gets into the uh what we've been
[1:40:43]
calling the performance modeling. Um,
that takes a look at Oh, sorry, previous
[1:40:49]
slide.
[1:40:53]
You're stealing my thunder.
So what we do is we take each of these
[1:40:59]
alternatives and we will run them
through a computer simulation and each
[1:41:04]
of these simulations is going to look at
um three different scenarios uh based
[1:41:10]
off of the peak water surface elevation
uh during a given storm. So a a 100year
[1:41:16]
or a 1% uh 2030 a 1% 2070 and then uh a
500y year or 2% 2070.
[1:41:26]
Um those elevation and peak elevations
off that top right corner of our slide
[1:41:31]
here. You can see those kind of level
off right around just under 10 ft, just
[1:41:36]
under 13 ft and then uh just over 13
feet. I can't see the decimal from here,
[1:41:43]
but it was I think 13.6 or something.
>> Nine.
[1:41:46]
» 3.9.
>> Yeah,
[1:41:47]
» 13.9. Thank you very much.
Um
[1:41:52]
the alternatives that we looked at was
first um just alternative one, which is
[1:41:58]
just that white alignment that you see
on the map to the left. That's the area
[1:42:02]
in and around the fish house and the
parking lot that's there. Um,
[1:42:06]
alternative two uh is the is the
affformentioned uh fish house area plus
[1:42:12]
the private seaw wall area along Puritan
road that zone B. And then um as an
[1:42:19]
alternative three uh we kept both of
those and then also incorporated um and
[1:42:24]
this is a little bit of foreshadowing
but we incorporated um some elevated um
[1:42:30]
portions of Wyatt Wales and Eisman's
Beach. And what we did there because
[1:42:34]
it's it was sort of the design of
anything like that was outside of our
[1:42:38]
scope. We just basically raised that
portion of those roads up to I think 17
[1:42:43]
ft something just large enough that
would everything gets blocked.
[1:42:47]
» So you raise the roads.
>> Yes. And numerically we raised the
[1:42:52]
roads. Yes. But it's not something that
is part of we're not we're not proposing
[1:42:56]
anything. I'm just wanted to actually
you'll see it on our next slide. I
[1:43:00]
should I probably should have led with
that. If you go to the next slide,
[1:43:06]
uh we see the results of our uh modeling
for each of those different scenarios.
[1:43:12]
Um so starting at the top left, we have
the existing condition and this is the
[1:43:17]
peak water surface elevation that we're
showing or I guess the peak water depth
[1:43:22]
that we're showing. And you those white
arrows are indicating where the water is
[1:43:26]
coming from. They're coming from over um
Fisherman's Beach and then of course
[1:43:30]
over um Cassidy Park to the right there
and then even more so or just as much I
[1:43:36]
should say at Wales and Isman. Um when
we do this for the other alternatives uh
[1:43:44]
one and two uh the results are virtually
the same. So if we're looking at this
[1:43:48]
really one of these things is not like
the other, right? And then what we'll
[1:43:52]
see here at alternative three, um there
virtually is no flooding. And what this
[1:43:58]
tells us here is that we can we can
block Fisherman's Beach through the
[1:44:04]
raising of private seaw walls through
fortification of Fish House. Um but
[1:44:09]
there is an alternative flood path and
that is over Wales and Eisman's Beach
[1:44:14]
and that's and that's basically the um
you know that portion of Puritan Road
[1:44:19]
that's a little bit lower. These are
extreme events. This is the 20 uh 20
[1:44:26]
» 70
>> Thank you. 2070 100year event. This is
[1:44:30]
the one that showed really the
distinction between these. What's the
[1:44:33]
current height of the uh flood walls
along Puritan Road behind Eisman's and
[1:44:39]
Wales?
>> Along P along Wales and Eisman
[1:44:43]
» the green that you added for good
measure.
[1:44:46]
» Yeah. Uh those are close to I want to
say 11 ft or so. There's no there's no
[1:44:53]
walls there, right? It's just it's the
road. So we didn't include any wall.
[1:44:57]
» No, there's a wall seaw wall.
>> Oh, okay. So
[1:44:59]
» all the way across the coast there. So
>> Okay. So that's
[1:45:03]
» steps
>> go up.
[1:45:05]
» But there are some lowlying areas for
sure.
[1:45:06]
» The lowlying areas.
>> Yeah. The grass, the drive that comes
[1:45:10]
into it. But
>> so why why make that area 17 versus 13
[1:45:16]
when we were talking about 13 the whole
time?
[1:45:19]
It was just we wanted to just separate
it from the design elements of of the
[1:45:25]
fisherman's beach study and just make it
something that was just a full blockage
[1:45:32]
of um water at that area. And and the
reason and the reason that it could be
[1:45:38]
something different over there is
because whales and eyesmans is more
[1:45:41]
exposed to the open ocean and so 13 ft
would probably be a little bit uh low
[1:45:47]
over on that side.
>> Is there an elevation change?
[1:45:50]
» Is I guess um can we could you guys show
us an alt three which has it at 13 ft?
[1:45:58]
» Why? Like
>> I just I just wonder how cuz you know
[1:46:02]
we've been talking about 13 and if I
mean to Wayne's point not to belabor
[1:46:06]
Wayne's point but he was saying why not
higher.
[1:46:10]
» I think they
>> but then you went higher.
[1:46:12]
» Isn't all two showing the 13T
to answer your question? I
[1:46:16]
» No, it is. But but if you look Okay. So
So alt one is just the fisherman's
[1:46:22]
parking lot. Alt two includes Puritan
Road and the you know in the um existing
[1:46:28]
seaw wall along Puritin road but alt
three includes 17 ft along Eisman's and
[1:46:34]
Wales.
>> Right. And is that the elevation that
[1:46:36]
you found that you needed to totally
block
[1:46:39]
» that? We use 17 because you were just
trying to block it off.
[1:46:42]
» 17 was just a conservative estimate. It
could have just been it could have been
[1:46:46]
just as much at 13 and a half or
something. And we just wanted we didn't
[1:46:50]
want to spend budget figuring out what
that design elevation would be over
[1:46:54]
there because we just wanted to assess
the viability of oils and eyesman as an
[1:46:58]
alternative flood path.
>> Yeah.
[1:47:00]
» Got it. So it's slightly outside of the
scope, right?
[1:47:03]
» Yeah.
>> Yeah. I get I get that it's outside the
[1:47:04]
scope, but I guess I'm trying to
disprove Wayne's point that it shouldn't
[1:47:07]
be 17 ft everywhere. And you maybe just
helped his argument by saying, "Oh, if
[1:47:12]
we did 17 ft here, you'd block this path
also and then you have no color change
[1:47:16]
because there's essentially no flooding
because we've sort of bur made a barrier
[1:47:21]
for that whole C area." So, I'm just
curious what it looks like if that area
[1:47:24]
we're only 13,
>> you know, and then why not?
[1:47:28]
» So, it's a Yeah. So it's a little bit um
uh misleading the way the way that we've
[1:47:34]
labeled this is we have these white
arrows are showing the direction the the
[1:47:39]
directionality of the flow. Uh the while
the results of these other three
[1:47:45]
colorful quadrants look very similar
because they end up with the same or
[1:47:49]
similar peak water surface elevation
>> um ultimately the the way that those
[1:47:54]
portions of the town get wet are very
different. Mhm.
[1:47:58]
» So in alternative one uh for example
where we have um just the fish house
[1:48:08]
protected, we still see water coming up
and over uh those homes adjacent to uh
[1:48:13]
Puritan Road behind Fisherman's Beach.
Um which is kind of what those white
[1:48:17]
arrows are showing at Fisherman's. If we
look at alternative uh two,
[1:48:24]
um those areas still get wet, but that
it's because water has actually come
[1:48:29]
through Wales and Eisman's to the south
and has kind of worked its way up
[1:48:33]
Humphrey Street and back. So B totally
get it. So basically what you're saying
[1:48:37]
is that if we don't do anything in Wales
and Eisman, the rest of it is it doesn't
[1:48:41]
make a difference if we do anything
else. We need to address Wales and
[1:48:43]
Eisman regardless if it's 13 ft, 17 ft,
whatever it is, that study needs to come
[1:48:48]
next.
>> That's correct. Richmond is then just
[1:48:49]
going to flag whales.
>> That's correct. During during this
[1:48:52]
during this extreme event which is a 1%
2070 storm. Yes.
[1:48:57]
» And this is a 1% where previously we
were designing to the point 2 the 500
[1:49:01]
year
>> the even more.
[1:49:04]
» So can we see a performance model of
that?
[1:49:09]
» Wait.
>> So I think it's inside the scope of what
[1:49:12]
we asked them to do here. No, but I mean
we we planned for
[1:49:17]
this all the plans prior talk about this
event that we're planning for, but then
[1:49:24]
we modeled to a worse event.
>> No, this is actually more likely. This
[1:49:27]
100year storm is more likely 1% chance
rather than 0.2%.
[1:49:31]
» Got it. I thought it was flipped. Sorry.
>> Okay.
[1:49:34]
» And just to clarify,
>> probabilities are worse in this case.
[1:49:37]
» Yeah.
>> Yes.
[1:49:39]
» In the last scenario, it's still 13 ft
along fish in speech. Yeah.
[1:49:44]
» Right.
>> Thank you.
[1:49:45]
» Yes.
>> Yes. Y
[1:49:47]
» sorry. Just want to make sure that's a
good clarification.
[1:49:51]
» Um
so with that, uh
[1:49:54]
» so we can't save the pump house without
doing the entire road is what you're
[1:49:58]
saying. So Mary Ellen's point originally
is while it was not within the scope of
[1:50:03]
your ask which I understand
if we don't basically
[1:50:11]
water will always find a path unless we
block it. So if we don't block it all
[1:50:16]
» we're probably not going to have any of
those assets. The original study, the
[1:50:20]
original study that was done was very
clear where our most vulnerable place is
[1:50:26]
in the section of uh not the fish, not
not Fert, not the fish house, but over
[1:50:32]
by
>> Philips Park,
[1:50:33]
» Wales and Phillips. That's our most
vulnerable area. So, in order for us to
[1:50:38]
protect our most vulnerable area and
plus some, we have to do the whole
[1:50:42]
corridor,
>> right? I would I would think that's the
[1:50:46]
the update to this to this study.
>> I guess I I would say you can protect
[1:50:52]
the pump station as a single building
using temporary flood barriers. You
[1:50:56]
don't you know like if that was the only
asset you were concerned about.
[1:51:00]
» You could do that pretty easily with
temporary flood barriers. There's not a
[1:51:04]
lot of flood pathways into that
building. Um really the charter for this
[1:51:09]
whole project was to look
comprehensively at the coastline um and
[1:51:12]
like what you know looking for a a
comprehensive approach to protecting
[1:51:17]
everything right so that's kind of what
this report is is doing but you can
[1:51:20]
absolutely you know protect one asset
separately through you know temporary
[1:51:24]
mechanisms
>> what what was the risk assessment over
[1:51:27]
as you get east
along right along Phillips Preston even
[1:51:33]
towards the Marblehead line
>> what was the I know that's a little bit
[1:51:37]
higher in elevation. Is that is that
what was that risk assessment lower
[1:51:41]
because that elevation is
above 13 ft? I think the um there was
[1:51:47]
fewer assets town municipal owned assets
I think in those in the area. Um Palmer
[1:51:52]
Pond is a pretty big percentage of the
flood area on Philips Beach. Um but I
[1:51:57]
think that first graphic kind of showed
the the extent and depth um page one.
[1:52:02]
Yeah,
>> there are some dark green areas here
[1:52:07]
» which is uh
>> Oh, thank you. Yes,
[1:52:10]
» by Philip Speech right there.
>> Yep.
[1:52:14]
» Keep going backwards if you're Yeah,
that one. Thank you.
[1:52:21]
» Okay. Well, this is a lot to digest.
Mhm.
[1:52:24]
» One of one of the things in common that
I see throughout here, and it goes back
[1:52:27]
to my original observation at the
beginning of your presentation, was the
[1:52:31]
fish house remains in the flood zone.
>> Mhm.
[1:52:34]
» As opposed to
being the option number one, which was
[1:52:39]
building the structure on the beach side
and then locking it up with the
[1:52:43]
temporary barriers, thus keeping the
fish house out of the flood zone.
[1:52:51]
Does that resonate with anybody or
>> using flood zone as in protected area?
[1:52:56]
» No, as in like what's going to be
flooded.
[1:52:59]
» So there's the fish the fish house is
sitting as it kind of cuts off, right?
[1:53:03]
The fish house is not protected
unless you mitigate what you were
[1:53:08]
talking about before, which is a
separate zone around the fish house
[1:53:11]
itself as opposed to being inclusive
along the beach line with,
[1:53:17]
you know, openings that can be
temporarily closed off through
[1:53:20]
mitigation or not barrier devices.
So, you're saying like take that blue
[1:53:25]
line, bring it to the actual uh front of
the parking, carry it all the way across
[1:53:30]
to the front of the fish house and
actually close it off and then bring it
[1:53:34]
back up alongside to the private
parcels.
[1:53:36]
» Right. We're like cutting.
>> So, if you if you just go take the seaw
[1:53:40]
wall and go, are you saying take the
seaw wall?
[1:53:43]
» Take the black line at the bottom. Take
the blue and pull it forward. Yeah. Pull
[1:53:47]
it forward. Whichever.
>> Right. Which was that was an option. It
[1:53:49]
was alternate one but but it was frowned
against because of I don't know if it
[1:53:54]
was the cost or the
>> I think John had mentioned there was
[1:53:56]
ongoing cost of maintenance that was
more significant
[1:54:02]
» but you you you you have
>> you solve the problem
[1:54:05]
» you sol you sol it's more of a solvable
problem
[1:54:07]
» a full problem and not just pieces of it
>> kind of let me kind of take this I think
[1:54:14]
to the next step if we did raise seaw
wall along the beach understanding the
[1:54:18]
higher maintenance cost,
>> right?
[1:54:20]
» Does that minimize, limit, alternate the
expense of the fish fish house specific?
[1:54:27]
» This is what I was trying to ask
originally.
[1:54:30]
» Yeah.
>> Um so if you
[1:54:32]
» or eliminate them,
>> if you did that, the the amount of
[1:54:35]
temporary barriers you need in front of
the fish house would be smaller than if
[1:54:38]
you did a perimeter back to um Humphrey
Street,
[1:54:42]
» right? Um, I think John's point was
because of the location, um, being sure
[1:54:49]
because sandashing back, um, installing
those temporary barriers in a sealed way
[1:54:53]
would be more difficult at the
beachfront, which is why we were leaning
[1:54:56]
towards the Humphrey Street alignment.
>> Um, but I do see your point.
[1:55:00]
» To be fair, what's any more different
about the difficulty of that than it is
[1:55:04]
along the other quarter mile of stretch
along Puritan Road and even on Eisman's
[1:55:10]
Eisman? Maybe that's a let's just stick
stick on the Puritan road area. What's
[1:55:14]
any different than that other than you
have an existing seaw wall there already
[1:55:18]
that you would be building upon or you
would
[1:55:20]
» as we discussed minutes ago you'd be
creating whatever you needed to create.
[1:55:24]
This is specifically for the deployable
barriers.
[1:55:27]
» So you're not using the temporary
deployable barriers. You're building
[1:55:30]
seaw wall there. So it's a little so
you're building a more permanent
[1:55:33]
structure not meant to be temporarily
removed and that's
[1:55:36]
» fair installed. So there'd be some more
reliability to that permanent structure.
[1:55:39]
» Great. Yeah.
>> Yeah. So the Puritan road that was all
[1:55:43]
permanent.
>> So the real
[1:55:47]
» alternative, right, Wayne's suggestion
of if the seaw wall is on the beach side
[1:55:52]
and then the temporary barriers were
closer to where the pier stands now on
[1:55:56]
the seawward side of the fish house. The
con for that is there's more significant
[1:56:01]
maintenance concerns and upkeep in terms
of cost and operations, but the efficacy
[1:56:06]
is similar.
>> Yep. You'd have to ahead of installing
[1:56:09]
those, you'd have to make sure that
they're clear of stick sand. Um because
[1:56:14]
those have to be affixed to a
foundation.
[1:56:18]
» Oh, got it. Okay.
>> So, but there's less
[1:56:21]
» deployable, but you can't
>> go ahead.
[1:56:23]
» Sorry. Deployable, you can't just put
them anywhere. You actually do install
[1:56:26]
like a prefab foundation that they're
attached to and bolted in. So, uh on the
[1:56:32]
asphalt side, it's obviously much easier
to keep that seal. Whereas if you're on
[1:56:35]
the beach side, traffic going over it,
you're going to get sanded on that
[1:56:38]
rubber all the time. So it's just
long-term effectiveness and and facility
[1:56:43]
of deploying it. But it is something we
can continue to look at. Um, you know,
[1:56:47]
if that's if that's the way the town
wants to go.
[1:56:50]
» That explanation is really helpful.
Thank you.
[1:56:52]
» The efficacy is not the same in that
day-to-day operation,
[1:56:56]
» right?
>> Yeah. I want to be very clear because
[1:56:58]
it's requiring expertise that we may or
may not have at the time of that storm.
[1:57:04]
Makes sense.
[1:57:07]
» Okay. So, what's some next steps here,
Nick, for this?
[1:57:12]
» We are waiting for the final report.
>> Okay.
[1:57:16]
» Yep. So, the final report um I think we
provided to Marcy. I think she's done it
[1:57:23]
on
>> Marcy.
[1:57:27]
» How long did it take to do this report?
I was going to say we we've received
[1:57:30]
comments from Martha Schmidt's committee
and if there's any other comments from
[1:57:35]
other committees like we're kind of
holding to see if there's any more
[1:57:38]
comments coming in from you know DBW and
um Harbor Waterfront that kind of stuff.
[1:57:42]
So um I think they're passing comments
to Mars you shall pass them to us. So um
[1:57:47]
anything that comes out of that we'll
update the report. So it isn't it's an
[1:57:51]
like a pretty advanced draft. Um, so, so
that's once we address or get receive
[1:57:56]
comments and address them all, then
we'll finalize it.
[1:57:59]
» Is this is this up on the website in a
very easily findable place?
[1:58:05]
» No, because it's not in a final form.
>> No, the draft. Yeah.
[1:58:08]
» No,
>> no, it's it's not complete. So, it would
[1:58:11]
not yet be released.
>> So, if we want public comment, why would
[1:58:14]
we not It doesn't matter. Why would we
not put it up in state explicitly draft
[1:58:18]
looking for public comment?
>> We We haven't invited public comment
[1:58:22]
yet. No,
>> we've invited commentary from
[1:58:25]
committees, stakeholder stakeholder
committees.
[1:58:29]
» Yeah.
>> But I but I think that they started the
[1:58:31]
presentation to say that what this whole
process was lacking was public input.
[1:58:36]
But that was not part of the scope by
which we could afford to hire them for
[1:58:41]
this process. So we need to finalize a
draft and then engage public comment
[1:58:49]
» for us to engage
>> for us to engage public comment outside
[1:58:51]
of Kleinfelder and so that we can do
something with this information.
[1:58:57]
» And what this will inform is any further
MVP grants or other CCM or anyone else
[1:59:02]
that might make available funds to
municipalities to go towards
[1:59:07]
implementation. These are all things
that are not built into our capital
[1:59:09]
plan. Coastal zone management is CZM. I
apologize. And then
[1:59:14]
» No, I know
>> MVP. I didn't know if you knew.
[1:59:15]
» No, actually we were just talking about
at the CARK meeting um climate action
[1:59:18]
meeting this week which was looking at
the uh
[1:59:21]
» vulnerability
>> MVP and CZM grants were being combined
[1:59:25]
» into a one-stop shop that actually
there's a on September 15th. There's a
[1:59:29]
webinar that the group is
>> Yeah, I think EA actually has all their
[1:59:32]
grants in a one-stop shop.
>> Yeah, it's not just them. So,
[1:59:36]
» but that's a next step type of thing. I
I I'd still like to see um draft or
[1:59:40]
otherwise I'm not saying necessarily
that uh the select board has to uh
[1:59:44]
engage in public comment, right? That's
a separate story, but um certainly um
[1:59:49]
there can be a form for public comment
to the draft. Um and those public
[1:59:53]
comments can be possibly included if
necessary into the final report.
[2:00:00]
I I don't I don't see why that's
necessarily a bad idea. Yes, I I agree
[2:00:03]
that we could have public hearings in
the future for public comment. Of
[2:00:07]
course, I I welcome that, but um I I
still don't see why uh a draft report
[2:00:12]
shouldn't be available to anyone who
requests it.
[2:00:16]
It's a draft. There may be things that
uh aren't seen, aren't known uh by
[2:00:21]
people in the community. Uh, and if we
don't do that, at least I'd like to see
[2:00:26]
um the two committees that have the most
fundamental uh stake in this, which
[2:00:30]
would be Harbor Waterfront and Climate
Action, to have a vote amongst them to
[2:00:34]
advise us as advisory committees to
advise us uh whether or not this report
[2:00:38]
is complete before we sign off on it.
>> My my committee, Harvard Waterfront, has
[2:00:43]
it. So,
>> yeah.
[2:00:46]
So, we've been working on this for how
long are we? It's three years now. Does
[2:00:50]
anybody know? Do you know, Nick? Do you
know?
[2:00:53]
» I don't.
>> He's the least likely here.
[2:00:56]
» It was two It was two grant cycles ago
that we were unsuccessful. So, um, so
[2:01:01]
probably two years, I think.
>> Well, it was, uh, I think it was the
[2:01:07]
the, um, it was around when Doug
Thompson had his magic markers and was
[2:01:12]
going to the board because we had to
identify ARPA money.
[2:01:14]
» ARPA money.
>> Is that what we we used ARPA money?
[2:01:17]
» We did. We did use ARPA money. Yeah. So
I'm saying we're over two and a half
[2:01:20]
years.
>> We It's been some time.
[2:01:22]
» So the reason I'm asking that is this is
it's been a long process and I just want
[2:01:26]
to know what's our target date to get
something going here so that we can be
[2:01:30]
applying for some of these grants
because there is new money going in for
[2:01:35]
grants. I think um
I know I went to a a meeting with Doug
[2:01:41]
and several people at the Fish House and
we were talking to the chair of one of
[2:01:47]
the larger committees.
>> Who was it?
[2:01:50]
» Seport economic.
>> No, it wasn't Seport Economic. It was um
[2:01:56]
somebody else.
>> So, um
[2:01:58]
» just the bottom line is there's more
money available now. Um I know Governor
[2:02:03]
Healey was putting more money towards
this this endeavor. So, I what what I
[2:02:08]
want to find out is when's the date?
What's our date of getting this
[2:02:11]
completed and and uh being able to apply
for this these monies? I guess I just
[2:02:17]
have two quick on Wayne's public
feedback. Uh
[2:02:22]
I I caution that we not that Kleinfelder
can't be wrong or that public can't give
[2:02:29]
input, but I don't wish the public to
sway
[2:02:34]
necessarily
scientific recommendation.
[2:02:38]
There's a there's a community input part
of it which I understand that you know
[2:02:42]
they've given a certain level based on
the way the way that they're waiting
[2:02:45]
things and if we choose to move that
weighted average to something else
[2:02:50]
because of community input that's up to
the community and I have no problem
[2:02:55]
doing that. I just don't want to
necessarily
[2:02:58]
sway this
sway that in this process. But I do want
[2:03:03]
to caution that we don't do what we did
with the peer and go straight to get
[2:03:08]
funding that the community doesn't
necessarily wholeheartedly support or
[2:03:13]
understand. And I I want to action
things that we
[2:03:18]
as a community feel will come to
fruition because I fear, you know, going
[2:03:22]
back to multiple entities and asking for
funds and them getting us getting funds
[2:03:28]
and then not not being able to sort of
really see something to its finalization
[2:03:32]
hurts us in the end for getting funds in
the future. So I want to make sure that
[2:03:36]
what we ask for we're going to do. Um so
that's just my two cents.
[2:03:43]
But this isn't even asking us to do
anything.
[2:03:45]
» No, we're just getting
>> I I just I just I was just cautioning
[2:03:48]
going out to get grant funding to do
something when we don't really have a
[2:03:53]
path forward about what we are going to
do. That's the part that I
[2:03:56]
» So in terms of delivering the final
report, you're waiting our our feedback
[2:03:59]
from our appointed advisory committees,
right? So that's something that Marzy
[2:04:04]
and I can work with as
>> the representatives to make sure we get
[2:04:08]
that back to then to Mary Ellen's point
to get the final.
[2:04:11]
» Well, those are advisory committees. So
those advisory committees should be
[2:04:16]
advising the select board. Shouldn't it
be the select the select board should be
[2:04:19]
the ones off, you know, okaying the
final report, not these advisory
[2:04:23]
committees,
>> right? I'm not sure that these advisory
[2:04:25]
committees should have direct um I don't
want to say influence or real contact
[2:04:29]
with Kleinfelder who's providing us with
the science and the data. I'm not sure
[2:04:34]
I'm understanding how the two coingle or
why they would. Right. Because to Mary
[2:04:38]
Ellen's point, they're advisory
committees to us.
[2:04:41]
» Sure.
>> Right. And it's just Right.
[2:04:43]
» So I don't know what the flow of
information is back and forth between
[2:04:46]
Kleinfelder and these committees, but I
don't think our committee should be
[2:04:49]
actively influencing or involved with
their report. Right. I I want to see the
[2:04:54]
scientific facts that tell us what we
need to do
[2:04:57]
» from a Kleinfelder perspective.
>> There's more than scientific fact here.
[2:05:00]
There's evaluation and analysis based
upon priorities in this report that is
[2:05:04]
more that it actually leads to effective
based solutions. So I do think that
[2:05:10]
these committees have um a lot of
consideration considering that they
[2:05:15]
affect the direct
the direct impact to to everything that
[2:05:22]
these committees study on a daily basis
on a on a regular basis.
[2:05:26]
» But these committees act as a as to Mary
Ellen's point advisories to the select
[2:05:31]
board.
>> Should we not use them as advisories?
[2:05:33]
» No. So they should be advising advising
the same thing. We just want to make
[2:05:39]
sure we're all working in 10, right?
>> We're just working together here, not on
[2:05:43]
separate teams.
>> Right. I think I think one question I
[2:05:45]
don't want to see advisory committees
just working with theel Kleinfelder and
[2:05:50]
the I don't want to just say Kleinfelder
when you have Woods, but you know
[2:05:54]
influence the outcome of the report,
right? That's not what their their
[2:05:57]
advice should be coming here,
>> right?
[2:05:59]
» So, do you with all of that in mind
because I do think this is four white
[2:06:03]
arrows all pointing at the same same
thing. Yeah. like do you two want to
[2:06:07]
talk to your committees and you can
>> share something with the board in the
[2:06:11]
first meeting in October to give you
time to get something
[2:06:14]
» on the calendar with each of them or
>> does that should be a recommendation
[2:06:19]
right so my committee um our next
meeting we're taking up discussion of
[2:06:23]
the report and the findings
>> great okay
[2:06:25]
» perfect and climate action had already
done it
[2:06:27]
» to
>> you know if there's anything that they
[2:06:29]
want to bring forward to the select
board then
[2:06:31]
» I will do that but
>> great
[2:06:33]
» that is what we're doing
>> and I have feedback back from Martha
[2:06:37]
from client action with that includes
from most of the committee individual
[2:06:41]
inputs.
>> Okay. So then I can synthesize or bring
[2:06:45]
together all the feedback that you two
gather and you can work with Marzy and I
[2:06:49]
directly to get it
>> so that you all can move to a final
[2:06:53]
final as opposed to a final draft.
>> Yep. Yeah, sounds good.
[2:06:56]
» I just have one quick question on the um
the barrier what do you call those
[2:07:00]
barrier things? The
>> flood barriers
[2:07:02]
» um
>> deployable
[2:07:03]
» temporary barriers. How long have they
been in the market? How long have they
[2:07:07]
been used? And how effective are they?
>> You know, over how about in Europe?
[2:07:16]
» Um, so we moved the mic. Oh,
[2:07:22]
» so the barriers that come to mind I
think are um is it Aquagate? Aquagate.
[2:07:27]
Aqua Fence. Thank you very much.
>> Fence.
[2:07:30]
» Thanks, John. Yeah, Aquafence is a
popular um brand that's very well
[2:07:35]
established in the United States as well
as Europe.
[2:07:37]
» How long have they been in the market?
>> I don't know off the top of my head. I
[2:07:41]
would have to go to their website.
>> What are they called?
[2:07:43]
» Aqua fence.
>> Google it.
[2:07:45]
» Um I do know that there
>> I do know that they're used around the
[2:07:50]
country um including um you know
valuable assets like hospitals um and
[2:07:57]
you know uh you know public buildings.
So it's not some it's not like a
[2:08:01]
one-off. I think they use they deploy
them in Boston at um the aquarium stop.
[2:08:06]
» Yeah.
>> For the W for the MBTA.
[2:08:09]
» Okay. Yeah. At the MBTA station there at
the top of the
[2:08:12]
» Yeah, the aquarium.
>> Pictures in the report.
[2:08:15]
» They deploy them there. I think Massport
deploys them around some of their
[2:08:18]
facilities.
>> Interesting.
[2:08:22]
» They first deployed in 2008 at Mount
Vernon.
[2:08:26]
» Oh, that's an important asset, Mariel.
Oh, sorry. Not that was not the first
[2:08:31]
deployment. That was a notable
deployment.
[2:08:34]
» Did you say a notable deployment?
>> A notable deployment.
[2:08:36]
» No, Vernon.
>> They're founded 99.
[2:08:40]
» Yeah.
>> Oh, thank you. Yeah. And I believe, you
[2:08:43]
know, there are different companies.
Aquafen, Aqua Gator is one of them. Um,
[2:08:48]
but a lot of them they'll fold up and
they, you know, you can stow them and
[2:08:51]
then they you pull them out and then you
can deploy them. And so it's something
[2:08:54]
that's like a minimum footprint when
you're not using it is the idea.
[2:08:59]
» Okay.
>> And then they linked what I think they
[2:09:02]
linked together.
>> I think we estimated for the fish house
[2:09:06]
um it would be about 4 hours to deploy
>> if you did a full perimeter.
[2:09:11]
» That's a long time.
>> It's long, but it'd be relatively
[2:09:15]
infrequent events.
>> And that was based upon the hump the the
[2:09:20]
street
>> all the way around the house. all the
[2:09:23]
way around.
>> That was the maximum of
[2:09:26]
» Well, that's good to know.
>> Based on a two person team, so
[2:09:29]
» Oh, Chino's got way more than two
people.
[2:09:33]
» Gino can do it faster.
>> Okay,
[2:09:36]
» great.
>> So, we have next steps.
[2:09:38]
» Next step is you guys are going to give
some feedback. We're going to talk about
[2:09:41]
this again in October and Kleinfelder
can go home.
[2:09:45]
I I would just urge um if staff Marzy
and Nick if possible to on like I said
[2:09:51]
September 15th 11 a.m. there's the
environmental climate onetop grant
[2:09:54]
program that was the merging of the um
of the CCM and MVP programs together. Um
[2:10:02]
you can maybe that's helpful because
that's our next steps is for future
[2:10:07]
grant programming.
[2:10:11]
» Okay.
>> Thank you John. the um
[2:10:13]
» Thank you very very much.
>> Thank you everyone. Have a good night.
[2:10:17]
» Thank you everyone.
>> All right, we're gonna move on to select
[2:10:21]
board. Oh, should we go back to the
charter commission?
[2:10:24]
» Yeah,
>> let's go back to charter.
[2:10:26]
» Oh, yeah.
>> Let's go do that. Oh, yeah. Um, one just
[2:10:30]
quick takeaway from this particular
conversation, Nick, is if you could work
[2:10:35]
a little bit more in concert getting
this information
[2:10:39]
um, to us before it goes out to
>> the public.
[2:10:44]
» The public. Um, which is not your fault,
but some other committees had it in
[2:10:48]
advance and then it went out in the
papers and we all heard about it. So,
[2:10:51]
um, would be great if those advisory
committees could advise us before they
[2:10:56]
advise the tides or the item. That would
be helpful. No offense.
[2:11:03]
Um,
[2:11:06]
all right. Moving back to the charter
review update, which
[2:11:10]
» you have to remember the item attends
all these meetings.
[2:11:12]
» The
item is present for those who don't.
[2:11:17]
» Um, okay. So, we were talking back to
the committee conversation.
[2:11:23]
» Um,
>> I think Marielen had
[2:11:25]
» Mary Ellen wanted to open up for
discussion post.
[2:11:29]
» So, my question is um did a did we ever
get the information from David David on
[2:11:36]
on what all the committees were
recommending for charter review?
[2:11:39]
» I do not yet have that.
>> I had asked
[2:11:43]
» we thought it might be with D.
>> Diane Diane has it. We've been talking
[2:11:47]
about this for a while, but has anybody
>> Well, I'm not to answer that.
[2:11:49]
» We do not have them right now. No,
that's to answer your question. We know
[2:11:52]
where they may be, but no, we do not
have them.
[2:11:55]
» Okay. So, the last time we had a charter
review, we had three people.
[2:11:59]
» Correct. That's my understanding. Three
people. Peter Spelios,
[2:12:03]
Jeff Beerman, and Mary, who Mary's named
after, Mary, the first female commodor
[2:12:11]
of the Swamp Scott. So, we had three
people. They went over at public
[2:12:15]
meetings. Um, I'm just wondering I I
think there's a couple things here. Is
[2:12:21]
are we looking at making this bigger
than what it needs to be? Do we really
[2:12:25]
need to have five or seven people? Can
we just go with three people? Um, if
[2:12:30]
we've already done the research two
years ago on what each committee feels
[2:12:35]
that needs to be adjusted within the
charter of under their purview, are we
[2:12:40]
already partially there? I mean, I've
brought it up twice. My biggest concern
[2:12:46]
on the charter, other than, you know,
tweaking some of the little stuff that's
[2:12:50]
not really relevant. Um, but my biggest
concern is that the moderator chooses
[2:12:56]
the finance committee and the
capital improvement committee. And I
[2:13:02]
think that that to me is something that
needs to be addressed um
[2:13:08]
you know very quickly and not wait for
several years to address it. I mean as
[2:13:14]
of right now we have a moderator who is
a moderator is on the capital
[2:13:19]
improvement committee and is the
chairman of that committee. And I don't
[2:13:24]
think that's good governance. And I
think the number one goal here is to
[2:13:27]
make sure we have good governance and
we're following, you know, following a
[2:13:31]
charter. So I think my my point here is
I don't want to make this long and drawn
[2:13:37]
out if we've already done a good amount
of the work and we already have a decent
[2:13:41]
charter. So just want to share my
opinion on this because I want to get to
[2:13:45]
making some changes in the charter
sooner rather than later. So is there
[2:13:50]
anything else in that comes to the
forefront that anybody else is really
[2:13:55]
dug in looking to see in terms of
changes to the charter? Is there
[2:13:59]
anything else that comes to mind? We
wouldn't know other than seeing the
[2:14:03]
minute seeing the information that David
you know has cor collected. I know that
[2:14:08]
from the committees that I was a
liazison to um I know the board of
[2:14:12]
assessors had a couple little tweaks um
and that was it. No other committee had
[2:14:17]
anything big. Everybody was pretty
>> Did you all engage the community in that
[2:14:20]
process as well?
>> No,
[2:14:22]
» no,
>> no. I don't think No, no,
[2:14:24]
» no. We just we had just opened sort of
the conversation with we should do this.
[2:14:29]
Let's reach out to committees and see if
they have feedback first, collect it,
[2:14:34]
synthesize it, and then go out to public
comment.
[2:14:38]
» How long ago was that?
>> David was chair. So,
[2:14:41]
» yeah. So, three two or three almost
three years ago.
[2:14:44]
» Yeah. And I would I guess while I hear
your point, imagine this sport's
[2:14:49]
comments three years ago,
they're likely today going to change
[2:14:53]
because boards change, opinions change,
people in charge change, ideology
[2:14:57]
changes, philosophy changes. So I while
I agree that there's an urgency maybe
[2:15:02]
for some things and that doesn't mean we
can't propose a charter change as the
[2:15:08]
board, can we not?
>> Sure.
[2:15:11]
» So yeah, we can. I mean we just it's a
town meeting warrant article and so we
[2:15:16]
could engage this fully comprehensive
process now but still suggest a warrant
[2:15:23]
article to ch to and say that we
>> believe in the sake of good governance
[2:15:28]
that that be needs to happen outside of
this other process.
[2:15:32]
» It is an option.
>> So is it fair to say from a process
[2:15:35]
perspective we could appoint a local
charter review committee to go do their
[2:15:40]
thing and they would come advise the
select board. we would adopt it or
[2:15:43]
change it or whatever before it would go
on to the next step in the process.
[2:15:46]
» Yes. Yes.
>> Previously, historically in Swanson
[2:15:49]
Scott, that has been done with an
article at town meeting
[2:15:52]
» to create that review committee.
>> So the first So first you go to town
[2:15:57]
meeting to get the committee created.
>> Correct.
[2:15:59]
» Then you panel the committee. You seat
the committee and then you I mean to
[2:16:04]
Mary Ellen's point that would take
years.
[2:16:05]
» I don't think
I don't think the charter says
[2:16:09]
» I'm not saying I didn't say the charter.
historically after talking to someone
[2:16:13]
who had drafted the charter.
>> Yeah. So
[2:16:16]
» he has it under good advisement.
>> But is there a mechanism to
[2:16:19]
» We don't have to do that to keep
>> We absolutely don't. You're absolutely
[2:16:22]
right.
>> Right.
[2:16:23]
» Okay.
>> Yeah. I think Danielle, we can we can we
[2:16:26]
can if we all agree that something is
important enough we can put forth a
[2:16:30]
warrant article and ask town meeting to
consider the change as we deem it
[2:16:35]
necessary. Do we have a legal opinion
about the role of moderator as chair,
[2:16:39]
moderator and committee member? Have we
sol we asked for?
[2:16:43]
» We did right after he was elected and
>> okay and they have said that's all
[2:16:47]
» there's not a conflict of interest.
>> Okay.
[2:16:48]
» It's not a it's not against any other
>> no statute
[2:16:53]
» any statute there's no statute there.
So to the presentation you had here Nick
[2:16:57]
with the anticipated timeline of this
getting started this fall and then by
[2:17:03]
the end of the summer we would probably
have
[2:17:06]
» the idea with this timeline would be
next a year from this December we were
[2:17:10]
coming to town meeting with changes.
>> Okay so
[2:17:13]
» unless we felt strongly about
>> 15 months from now.
[2:17:16]
» Does this group think that that's too
far?
[2:17:19]
» Yeah. I mean not not for every change. I
think I think Yeah. Well, you are the
[2:17:25]
chair.
>> I think between Danielle, Maryanne, and
[2:17:27]
I, I think that's what we were sort of
hinting at that it feels
[2:17:31]
» like a long time. Am I wrong?
>> It does feel like a long time. But I
[2:17:34]
mean, I think there are some other
things that I'd like to see evaluated,
[2:17:37]
at least studied in the charter, which
is how our board of health is set up um
[2:17:42]
and what they have in terms of influence
on their own director. That that's the
[2:17:50]
test case for why I said in three years
I think committees have changed because
[2:17:54]
three years ago the board of health
might have had
[2:17:56]
» no comment but maybe they might have
comment now there are different set of
[2:18:00]
folks who might have different thoughts
and feelings. So
[2:18:03]
» okay so one area you'd like to see
>> um
[2:18:06]
» you have other thoughts. Yeah, there was
another thing I was
[2:18:09]
» one thing that Marzy has brought up in
the past is the composition of the
[2:18:12]
planning board
>> to for site plan special permit to be
[2:18:16]
granted which almost every project in
town needs. You need four out of five
[2:18:19]
members.
>> Oftent times over my last two years as
[2:18:22]
chair we had one if not more than that
members that were conflicted due to
[2:18:27]
proximity
>> since we're a tiny little town. Um so
[2:18:30]
the idea was brought up do we can we
explore the idea of alternates that's
[2:18:34]
permissible under state law for some
boards planning being depending on the
[2:18:39]
town planning being one of them. So long
story short looking at the composition
[2:18:42]
of the planning board for that reality.
>> So that's another change. So
[2:18:46]
» so why can't we can we do both
simultaneously?
[2:18:49]
» Yes we can.
>> Does that satisfy you?
[2:18:51]
» Oh yeah.
>> Okay. I just I don't really see a need
[2:18:54]
to go to town meeting to ask to approve
a a committee. We could we just approve
[2:19:00]
a committee ourselves.
>> Well, could we appoint a committee in
[2:19:04]
the next couple of months and then try
and just
[2:19:07]
» Yes.
>> We've already advertised like, hey,
[2:19:09]
we're getting ready for this. Well,
instead of going to town meeting in
[2:19:12]
December of 2027, May of 2027, or is
that time to
[2:19:17]
» I don't think that we could reasonably
>> go through a process that looks at
[2:19:20]
things that get raised by the community
>> outside of this targeted
[2:19:24]
» That's fair
>> initial effort. I think that would be
[2:19:28]
too quick.
>> Okay.
[2:19:31]
» This isn't something we want to rush.
It's what actually the town that's how
[2:19:35]
we operate.
>> So, I think there's a utility to having
[2:19:39]
a diverse group appointed to review it
and taking time to review it and
[2:19:43]
engaging the public in that review
>> if there's a true desire to do it right.
[2:19:47]
If if there really is, you know, the
feeling that the the charter needs um
[2:19:53]
significant revamping, edits,
correction, whatever, but if it's really
[2:19:57]
a standalone issue that, you know, some
of us have concern over the moderator
[2:20:02]
and or you know the
>> we have moderator, planning board, board
[2:20:05]
of health, but those are all
>> right.
[2:20:07]
» And I'm not saying that's the board. I'm
not saying on behalf of the planning
[2:20:10]
board that was a concern brought up. So
they should Yeah. You know, it's
[2:20:13]
something that should be explored. Like
I'm sure you're
[2:20:14]
» I just think like I think there's a
smaller issue. It's not a big one, but
[2:20:18]
you know, standing committees versus
advisory committees. We've had since the
[2:20:22]
last charter update like two or three
other committees that have been
[2:20:24]
regularly meeting. I'm not saying that
that's I would I would never insist to
[2:20:29]
do a charter review because of that, but
it's one of those things that can be
[2:20:33]
» I don't think we should look at this as
something that is a bad thing to be
[2:20:37]
doing. It's a best practice.
>> It's been 10 years since the community
[2:20:40]
has looked at it as a group.
>> So whether it's you all
[2:20:44]
» appointed saying not to do it.
>> Well, no. He just said I would never say
[2:20:49]
this is a reason to do it. I'm saying
the the the fact that we've come up with
[2:20:52]
five topics after saying there's
something targeted that we can get just
[2:20:55]
demonstrates that there are likely ideas
to be
[2:20:59]
» that are worthy of discussion.
>> And I think once you start thinking
[2:21:02]
critically, you'll find other things
>> other things because we haven't thought
[2:21:05]
about it critically in 10 years. So
>> when these when these happen do that is
[2:21:09]
it uh is there generally a review and
encompassment of the remaining bylaws
[2:21:15]
zoning bylaws plan you know
>> no it's a charter review specifically
[2:21:19]
the charter
>> yeah just charter
[2:21:22]
» a zoning bylaw like rewrite is a whole
other situation I mean we go through
[2:21:27]
those occasionally I've seen right I've
seen years where like you know they went
[2:21:30]
through and we changed bunch of things
>> manually the last charter review that we
[2:21:35]
did they had they had public meetings
constantly and they had their open
[2:21:39]
meetings constantly and I remember
through the entire thing um the chair
[2:21:44]
saying it was only at one meeting that
they had one person come so and it was
[2:21:50]
you know it was publicized
pretty consistently but they did a lot
[2:21:54]
of work I mean those three individuals
did a whole lot of work I followed that
[2:21:59]
» okay so I guess what I would suggest I
guess the point of impact right now is
[2:22:04]
whether we wait to town meeting to ask
them to allow us to appoint the
[2:22:08]
committee or if we just do it.
>> We just do it.
[2:22:11]
» I would just what would be the point of
go I understand historically but what
[2:22:15]
was the point in the past go to town
meeting to ask them
[2:22:18]
» they did they vote they're they're
responsible for approving the charter.
[2:22:23]
So engaging them in the process
throughout is a way to make sure we're
[2:22:26]
building consensus throughout as well.
>> So just building exercise.
[2:22:29]
» Yeah. Yeah, they participate in the
formation of the committee, the charge
[2:22:32]
and how it's composed.
>> You're you're in a better position at
[2:22:36]
the end to say
>> here's the suggestion.
[2:22:39]
» Here's where we came from.
>> So that was the framework. They approved
[2:22:42]
the creation of the committee and the
composition of it and the appointment
[2:22:45]
power of
>> the members. Okay. I
[2:22:47]
» mean, it's nothing to say that we can't
it can be different. That's just what's
[2:22:52]
been done in the past.
>> Yeah. I would have actually I'd have to
[2:22:56]
see his I'd like to see what the article
looked like to appoint that 2016
[2:23:01]
committee. I mean I
>> I mean town meeting may have an a a an
[2:23:05]
opinion upon who is on that committee.
I'm not just saying by by name but by
[2:23:11]
position right they may have um
different opinions upon that. Should I
[2:23:16]
and I think there may be some value to
having that heard not to delay it. I
[2:23:20]
mean, we're in middle of September. Town
meeting, winter town meeting is when?
[2:23:24]
» December.
>> First week of December.
[2:23:25]
» First week of December. So, we're only
>> not that far away.
[2:23:29]
» Two and a half months out.
>> 10 weeks. There you go.
[2:23:32]
» So, even if we took a little time to get
this ready to go,
[2:23:36]
not versus going to town meeting,
getting the getting the, you know, the
[2:23:41]
the buy in and then getting the
committee done. just get everything
[2:23:45]
ready to propose and just lock it in at
the first week of town meeting.
[2:23:51]
» Well, let's just
>> I don't
[2:23:54]
» I'm just saying if we want buy if we
want buy in from town meeting first
[2:23:58]
» I'm just saying
>> agreed.
[2:23:59]
» I I we're not looking I don't I think
when I hear we're looking for buyin but
[2:24:04]
we need to do a charter review. I mean,
>> that wasn't the buyin part. I was I was
[2:24:08]
suggesting it was the buyin of how the
committee is is who's on the who's on
[2:24:12]
the committee. The composition.
>> Composition.
[2:24:14]
» The composition. That that was the piece
of it.
[2:24:17]
» Okay. How about we get the last Warren
article in front of us and then
[2:24:22]
distributed and then we give feedback to
um Nick and we can put it on the next
[2:24:28]
agenda to talk about.
>> Does that make sense?
[2:24:31]
» The last war article
>> that composed
[2:24:34]
» the previous one. The previous Oh, the
last one. the previous one I thought
[2:24:36]
from 2016 or 15 whenever the last war
article was put forth before town
[2:24:40]
meeting. That way we're talking about
something real and not something obscure
[2:24:44]
and that way we can have thoughts and
opinions on it
[2:24:47]
» and we'll go from there.
>> Yeah.
[2:24:49]
» Okay.
>> Great. I like that.
[2:24:50]
» Speaking of town meeting.
>> Yes, sir.
[2:24:52]
» When hypothetically if this were to go
on a warrant, when do we open the
[2:24:55]
warrant for the December town meeting?
That was on a timeline you shared at
[2:24:58]
some point, but
>> I want to say it's the the next meeting.
[2:25:02]
I think it's the last meeting of this
month and that stays open until October.
[2:25:04]
Understood.
>> But it might be the first meeting in
[2:25:06]
October. I have to double check that.
>> Okay. But it's in the next meeting or
[2:25:09]
two.
>> The real question is when does it
[2:25:10]
closed? So it needs to be closed two and
a half weeks prior because there's been
[2:25:15]
multiple times where No, even No, we've
changed the timeline.
[2:25:19]
» No, it's going to be closed at the very
end of October so that we have time to
[2:25:22]
get it printed and out in advance.
>> But we talked about in May last year we
[2:25:25]
changed the timeline.
>> When does it have to be closed?
[2:25:26]
» End of October.
>> End of October. Okay.
[2:25:28]
» I'll I'll bring that slide to the next
meeting so we can just all look at it
[2:25:31]
again and be on the same page or I'll
send it around to the five of you at
[2:25:33]
least.
>> Okay. Thank you to that.
[2:25:35]
» We're going to move now to the
discussion of the select board goals and
[2:25:39]
priorities.
>> All right. We uh for those of you who
[2:25:44]
don't know,
>> we met on a Saturday, a sunny Saturday
[2:25:50]
in June at town hall in an open meeting
to discuss
[2:25:56]
select board goals. We gave individual
goals and then we sort of ranked them in
[2:26:04]
conversation
um to to create some priorities. And
[2:26:08]
what we hope to do is to distribute the
goals and priorities to
[2:26:14]
the boards and committees that advise us
as a way to help them advise us in line
[2:26:22]
with our goals and priorities. So this
is supposed to help not only color the
[2:26:26]
conversations we have here but outside
of here um to make sure that you know
[2:26:34]
when boards and committees are moving
they are moving with confidence forward
[2:26:39]
in line with our goals.
So
[2:26:43]
um we sort of grouped them um into
>> let's see the meeting
[2:26:51]
» multiple
priorities. The first one being
[2:26:54]
financial um these are all from the meet
the meeting minutes.
[2:26:58]
» Okay.
>> Um from it's the fourth tab.
[2:27:01]
» Tab number four.
>> The fourth tab.
[2:27:03]
» Was that July 7th? No.
>> No. June.
[2:27:05]
» June 27th. It's tab number four.
>> Tab number four. Go to tab four.
[2:27:09]
» Perfect. Thanks.
>> See tab four.
[2:27:12]
Okay. So, um discussion included uh
long-term financial policy review. We
[2:27:17]
talked about overtime management that
that being a priority for the board,
[2:27:21]
health insurance costs and looking at
OPED and retirement planning. Um we
[2:27:26]
talked a lot about financial forecasting
and budget sustainability and long-term
[2:27:32]
financial planning. Um I think part of
the uh long-term financial planning
[2:27:38]
included having conversations like in
tri chair with um school and other
[2:27:46]
making sure that we had theus accurate
and correct and you know all those
[2:27:50]
things we had t spoken about at the last
collective tribe board meeting between
[2:27:57]
fincom us and um school committee. Um,
we talked about operational and
[2:28:02]
organizational priorities including the
charter review. So, we're already um
[2:28:06]
coming to fruition at least on one of
the charges. Um, we talked about trying
[2:28:10]
to improve municipal operations uh
through internal and external
[2:28:14]
communications.
Uh, committee coordination. This whole
[2:28:18]
exercise was meant to help in committee
communication of committees but also
[2:28:23]
their viewpoints on where they're taking
things. Um, trying to organize legal
[2:28:28]
review. I think legal cost was also
under financial priorities and legal
[2:28:33]
review sort of grouped into the idea of
how much who's reaching out for legal
[2:28:37]
review if it's appropriate what what it
if there's additional costs involved
[2:28:41]
who's vetting that before it goes
through.
[2:28:44]
Um
we talked a lot about labor relations
[2:28:48]
versus municipal operations. Um Wayne
had brought up a I think it was you
[2:28:53]
Wayne a great idea about board and
committee orientation and training. Was
[2:28:57]
it you? Yes, I think it was you. So,
>> um and that there are a couple really I
[2:29:02]
can only think of school committee, but
I don't know if FinCom goes through a a
[2:29:06]
training.
>> The assessors have training.
[2:29:08]
» The assessors have training. So, there
are some committees right now that do
[2:29:10]
have training. Um there are some that do
not.
[2:29:13]
» Finom does have a training. You could
take you can do a training thing.
[2:29:18]
» The state association does it.
>> Okay. Some of these were the issue.
[2:29:21]
Yeah. Some of these were um you know
like you said or um my god who did you
[2:29:26]
just say the um
>> planning
[2:29:28]
» plan no
>> planning and zoning go through it
[2:29:30]
optional training as well
>> assessors
[2:29:31]
» assessors that was the one I was
thinking of they have very specific um
[2:29:35]
related very specific training related
to their duties I was more talking about
[2:29:38]
at a high level of how to organize
meetings just kind of basic leadership
[2:29:42]
uh development within our own committees
right
[2:29:46]
» how to take minutes how to post minutes
>> uh how to make sure you post on teams
[2:29:52]
correctly. How do we make it publicly
accessible?
[2:29:56]
» So, um also have uh community governance
improve or committee governance
[2:30:02]
improvements which I think have a lot to
do with minutes and making sure that
[2:30:06]
agendas are posted with the correct
amount of information on them at the
[2:30:10]
appropriate time. Um and then HDC
historic commission coordination
[2:30:18]
figuring out historic district
um commission.
[2:30:22]
» That might be something for the charter
review.
[2:30:25]
» Is that that's a charge? Is this a
charge from the charter? The
[2:30:29]
» HTC?
>> That might be something to consider. We
[2:30:31]
all had
>> Is it in the charter? Did we create
[2:30:34]
that? Or
>> is that a bylaw?
[2:30:36]
» I don't know. I have to check.
>> Well, we should talk about that because
[2:30:38]
that is something we talked in depth
about whether
[2:30:41]
» it's scope, its appropriateness,
>> it's necessity.
[2:30:47]
» Um veterans committee, we heard Mr.
dementoto volunteer to uh to help
[2:30:52]
coordinate getting some veterans
involved in at least figuring out who's
[2:30:56]
available for housing, but I think Wayne
really was talking more about a veterans
[2:31:01]
committee, which we used to have in
town.
[2:31:04]
» I was I was more looking for um a
committee that could represent the
[2:31:10]
continuing needs of Swamp Scouts
veterans. And the the right now um it's
[2:31:15]
my understanding we haven't had a an
actual veteran survey since 1991. It's
[2:31:20]
my understanding. Um and I'd like to see
uh you know the needs of the veterans of
[2:31:25]
different ages and different
military scenarios over time have
[2:31:30]
changed and the support needs have
changed and um I I feel that we're kind
[2:31:37]
of walking a little blind. M
>> um so um I don't think that committee is
[2:31:42]
just something you put together. I think
uh it needs to come kind of kind of come
[2:31:46]
from a grassroots
from from the bottom up. Um so I've
[2:31:52]
talked Mr. Deto, I've talked to a couple
other people in the community about
[2:31:57]
trying to get some information, trying
to get some people that might be
[2:32:01]
interested um into eventually I'd love
to see a formal advisory committee
[2:32:06]
formed. I don't think this is something
you can do overnight, but it's something
[2:32:09]
I'd like to definitely target.
>> Great.
[2:32:15]
» But hold on a second. We absolutely have
to have some type of a committee
[2:32:20]
together. Now, whether or not it's Mr.
Demento is going to run an ad hoc
[2:32:24]
committee, but we we have to make a
decision on an on what are we going to
[2:32:29]
do as far as putting together a team of
people that will be able to advise and
[2:32:34]
find veterans who would qualify for
veterans housing.
[2:32:37]
» Yeah, I think
>> I mean, isn't that a charge of the
[2:32:39]
veterans agent?
>> I was going to ask that question. Yeah.
[2:32:42]
» Right. Isn't he wouldn't he spearhead
something like that?
[2:32:45]
» So, I guess there's a difference between
and this was explained when we first
[2:32:49]
started to talk about this project.
There's a difference between the
[2:32:52]
information available to the veterans
agent and the information that would be
[2:32:55]
available to BBH and getting veterans in
the housing. Um, so there is some
[2:33:02]
information that that they cannot share
with BBH for privacy reasons and things
[2:33:08]
like that. So I I thought what the first
charge was when we had talked about this
[2:33:12]
and this was like 18 months ago was that
once we were on this path of this
[2:33:16]
happening, BBH was going to get us some
information involving you know the
[2:33:21]
calculation of AMI and how and that way
we could bring it to the veterans agent
[2:33:27]
understand how they're calculating it
and how they're what the criteria and
[2:33:31]
conditions are so that the veterans
agent can help us along with some ad hoc
[2:33:35]
members to identify help calculate
identify and then apply.
[2:33:40]
» So, we're going to have people, random
people in Swampscott as members of a
[2:33:45]
committee with access to information
that is confidential.
[2:33:51]
» No, no,
>> no. So,
[2:33:52]
» no, they just they just No. They just
need to understand how BBH needs to tell
[2:33:57]
us how to calculate it.
>> Yeah.
[2:33:59]
» And we can provide that information to
veterans and we could through the
[2:34:04]
veterans agent. they I don't they
already have access to it to not their
[2:34:08]
income or anything like that but the
list of people we income driven
[2:34:13]
» but it's just the AMI parameters that
you have to meet and stay under that
[2:34:16]
we're
>> yeah I'm not advertising to the AMI just
[2:34:19]
» this committee is just hoping to get
more people
[2:34:21]
» this is more of a marketing market
>> I think you're all saying the same thing
[2:34:24]
in different ways that it's it's a it's
a group of residents and citizens that
[2:34:29]
can
>> that can help advocate along with Mike
[2:34:32]
and the other assistants that work in
his office in Lynn
[2:34:36]
» to make sure everyone that should be el
should be eligible or that we believe is
[2:34:39]
eligible knows about it.
>> Yeah.
[2:34:41]
» The individual can then make their own
determination whether or not they are or
[2:34:44]
whether or not they're interested,
>> right?
[2:34:46]
» But it's sort of it's all these pieces
together is how we will
[2:34:50]
» do what you want and what you want and
what like it's all together. I mean
[2:34:53]
there's also advisory in terms of what
services could be created or or provided
[2:34:58]
at the the new center that we're
eventually going to be having. What I
[2:35:04]
don't want to see happen is what
happened at Michon. At Michon the I
[2:35:09]
think that Benet
put out a great effort in getting the
[2:35:13]
message out. I mean they were constantly
at the farmers market talking to people
[2:35:17]
about how to apply to get into Michan.
They they were sending out flyers. They
[2:35:21]
did a lot of stuff. However, we had a
small a very small amount of people who
[2:35:26]
ended up getting into Michan which
didn't make any sense after we ran the
[2:35:31]
numbers. So, I just don't want to I
don't want to I don't want to leave it
[2:35:37]
out there. I don't want to be vulnerable
to having a mistake made here. I mean,
[2:35:41]
this is veterans housing, and I want to
make sure we have every opportunity to
[2:35:44]
get veterans in there.
>> I guess um
[2:35:48]
» Well, how do you equivalate equival
I'm trying to understand how you're
[2:35:51]
linking that to the to the Michan BBH?
>> So, what So, the question is what
[2:35:58]
happened? We were we actually were here
talking about it at the select board
[2:36:01]
meeting when when we were first even
thinking about um going into going to
[2:36:06]
veterans housing. One of the concerns
that we had and actually Peter was here
[2:36:11]
um when I had I had the statistics to
show really what happened and it was a
[2:36:15]
real question like with all that effort
that went out why is it only a small
[2:36:20]
handful of Swamp Scout residents got
into the Michan and so through those
[2:36:25]
conversations we had decided we don't
want to be in that position again. We
[2:36:29]
want to make sure we do a really good
job of making sure that people come and
[2:36:33]
and apply and figure out what they have
to do. And in a conversation I had with
[2:36:37]
Kim Martin Epstein, there are things
that you can do to manage your assets.
[2:36:42]
So, one of the problems with Michon was
a resident of Swampscott could have x
[2:36:48]
amount of dollars worth of asset and
make and be bringing in a small amount
[2:36:52]
of money income on social security, but
because of that asset, it ended up
[2:36:56]
disqualifying them or or what happened
quite a bit was people felt that because
[2:37:00]
they had that asset, they didn't even
apply when they could have applied.
[2:37:04]
» And there are also things that you can
do, I'm sorry, you can do in advance to
[2:37:08]
protect that asset or, you know, put in
a different position. So you do qualify
[2:37:13]
for that. So you know for example if you
have a veteran you have a veteran who
[2:37:17]
was on the state police state police
officer and he makes a decent pension
[2:37:23]
now would he qualify or how do we get
him to qualify? How do we help him
[2:37:28]
legally to get him to qualify? So I
don't know that we can help.
[2:37:32]
» We can by getting information.
>> That's what I was ineloquently saying
[2:37:36]
earlier like getting the in getting the
conditions from BBH and understanding
[2:37:41]
either through um the help of Kim Martin
Epstein or other
[2:37:45]
» people who have far more information on
this than we do. How can we help people
[2:37:50]
get into a position that when it comes
time to apply, they can be certain that
[2:37:55]
they meet the parameters and they can,
you know, be confident that their
[2:37:59]
application will be considered. That was
the conversation we had initially, not
[2:38:04]
necessarily, you know, trying to get
into their confidential information or
[2:38:07]
anything like that, but advocating for
folks so that they know if they have a
[2:38:10]
large asset like a home, how they put
it, how how they can
[2:38:14]
» secure it,
>> secure it in a way that still allows
[2:38:17]
them to be able to apply to the
situation.
[2:38:19]
» Okay,
>> that's that's what
[2:38:21]
» just pushing out the information. So we
have to get the information first and
[2:38:25]
then we have to simultaneously assemble
people who are reliable and giving out
[2:38:30]
the information correctly.
>> Wayne, your point in addition to all of
[2:38:34]
that was to have this committee do
advise a select board on programmatic
[2:38:38]
things and support issues the ongoing
needs of the veteran
[2:38:42]
» community. Not just for the housing
project. The housing project
[2:38:46]
committee is different.
>> Yeah. Okay. Got it.
[2:38:49]
» Uh
>> I think the committee we're talking
[2:38:51]
about is temporary.
>> Yes. you know, it's just a task uh task
[2:38:54]
committee. Wayne's committee is, you
know,
[2:38:56]
» ongoing.
>> Yeah. I'd like to be a standing standing
[2:38:58]
committee.
>> Yeah.
[2:39:00]
» Um again, moving on to public safety and
enforcement. Some of these things we've
[2:39:05]
already talked about and we will
continue to talk about, but parking
[2:39:08]
enforcement, traffic safety, pedestrian
safety. Mary Ellen has brought up, you
[2:39:12]
know, fire and ambulance response and
infrastructure.
[2:39:16]
you know, when we had talked about
whether the roads were wide enough and
[2:39:18]
things like that, that's, you know, part
of what we're talking about there.
[2:39:22]
Illegal dumping.
Um, infrastructure priorities, we had
[2:39:27]
discussed, you know, obviously there's
some infrastructure improvements that
[2:39:30]
need to be made as Kleinfelder sort of
discussed today. Water infrastructure,
[2:39:34]
water harbor, waterfront development. We
talked about beach concession areas, um,
[2:39:40]
harbor management, which we talked about
with Kleinfelder.
[2:39:43]
Um parking we has been a topic of
conversation in very recent history. Um
[2:39:48]
parking management you know if we need
infrastructure improvements for that. Um
[2:39:52]
future development of parking and the
financial impacts thereof. Um
[2:39:58]
on the economic development we all
a agreed
[2:40:03]
without delay that Hawthorne Hadley were
you know developments that we properties
[2:40:08]
that we needed to see developed. Um, the
church parking lot came up in
[2:40:13]
conversation. I'm sorry, that would be
the St. John's Church parking lot. Um,
[2:40:18]
establishment of a potential economic
development committee. We talked about
[2:40:23]
that. We didn't really land, but
something we can continue to talk about
[2:40:26]
here. Um, developing a long-term
economic development plan, redevelopment
[2:40:31]
of unused town- owned properties that we
had a long conversation about that. And
[2:40:36]
then the preservation and redevelopment
of historic properties.
[2:40:40]
um
let's see community priorities,
[2:40:44]
community engagement, community trust,
communication with residents and the
[2:40:48]
support from the boards and committees
to facilitate that and more. Um I think
[2:40:55]
you know we we are in a rebuild process
for engagement and trust and it's really
[2:41:00]
important in that to be to try to be
transparent as we can be and communicate
[2:41:07]
as much as we can and um it would be
helpful from the community to all one of
[2:41:13]
you that's listening but hopefully lots
of people are listening on YouTube and I
[2:41:16]
can't see you. Um, if you have
thoughtful ideas, contact Shannon,
[2:41:20]
contact Civic Plus, contact any one of
us, call Mary Ellen, call me. Um, to say
[2:41:28]
we're not engaging enough is okay. To
say you could engage better by doing X
[2:41:34]
is better, right? And that's helpful and
we can action that. Um
[2:41:40]
to continue on the communication route,
charter review communication, committee
[2:41:45]
communications, public messaging, annual
reports is really something that's
[2:41:49]
fallen off the radar for a a lot of
boards and committees. There's
[2:41:54]
» Don't they get filed with the clerk
every year?
[2:41:56]
» Well, they're supposed to, Ted. I don't
know that every board and committee has
[2:42:00]
been doing it. under our former clerk,
there was a delay with some annual
[2:42:05]
reports and that's being
>> remedied by our current clerk.
[2:42:08]
» Understood.
>> So maybe we will get back into the swing
[2:42:11]
of annual reports and
>> understanding why they're important, how
[2:42:15]
they report out to the community and
um we've gone through some website
[2:42:19]
improvements. I bet there'll be more um
but we did talk a little bit about that
[2:42:26]
and then better public engagement. We
are always looking for ways to not be
[2:42:31]
the ones sitting up here, right? Like we
want to be here right now, but like
[2:42:35]
there there's a whole version of the
public that should be engaged. And if
[2:42:39]
you want to sit in my seat, happy to
discuss it with you. Um so the action
[2:42:46]
items we left with are uh reviewing the
charter, which is great because we're
[2:42:50]
talking about it now. um developing a
long-term financial plan, evaluating the
[2:42:56]
Hawthorne and the church parking lot
opportunities. We're sort of in the
[2:43:00]
midst of that and we'd like to get
closer towards the end of that.
[2:43:04]
Continuing OPED analysis,
um reviewing the health insurance costs,
[2:43:10]
uh evaluating a parking management
strategy. We started that which is
[2:43:13]
great. Um we had been talking about that
and now I think it's coming to you know
[2:43:18]
closer to fruition in our last meeting.
developing
[2:43:23]
economic development framework,
reviewing the committee structure and
[2:43:28]
the orientation process, continuing with
infrastructure planning like our
[2:43:33]
conversation today with Kleinfelder and
others, but also, you know, we had a big
[2:43:38]
push recently um in the last couple of
years to not just talk about all the
[2:43:44]
things we've failed to do, but how we
safeguard the things we're doing now. So
[2:43:50]
you know especially on the beaches we've
we had a lot of
[2:43:55]
long time of failure of not doing enough
and now we are doing it. So how do we
[2:44:00]
simultaneously continue to make
improvements and safeguard the
[2:44:03]
improvements we've made? So we talk a
lot about mitigating future issues and
[2:44:08]
um making sure that that is cod like
codified in some way um in capital and
[2:44:15]
then improvement to community
communication strategies.
[2:44:19]
So I think for our next steps we sort of
have to figure out short, medium,
[2:44:25]
long-term projects and if there are de
uh departmental folks who can help us
[2:44:31]
facilitate some of them and then try to
implement a timeline because
[2:44:36]
that'll hold us accountable.
>> There's a lot of stuff on this list,
[2:44:41]
» right? And I I
>> Can you speak into the mic?
[2:44:44]
» Oh, sorry. There's a lot of stuff on
this list. Can you hear me now, Nick?
[2:44:48]
» Get closer. like you're a rock star
wonky setup here tonight tables.
[2:44:54]
So, what does success look like? I mean,
h how are we really judging by the la
[2:45:00]
large laundry list of things? I don't
want this to just be u an exercise in
[2:45:07]
futility, right? I mean, how do we
really assess
[2:45:10]
how well we've done, how how close to
goal we're getting? What does it look
[2:45:14]
like? I mean, what does completion look
like? you know, so I'm struggling just
[2:45:18]
looking at this, you know, all of this
this list of things. You know, it maybe
[2:45:23]
we need to organize it a little bit
more. You know, maybe it needs to be
[2:45:27]
broken up short-term, midterm,
long-term. Um, you know, I'd like to see
[2:45:31]
things completed, checked off. What is
what does that look like? Right.
[2:45:35]
» I I think we need a little more
definition
[2:45:38]
in order to do that.
>> Yeah.
[2:45:39]
» Um, we talked a lot of these are very
very high level. Um, they have
[2:45:43]
subcategories to each one of them.
>> Yeah. Um, and maybe we can start to
[2:45:46]
stretch that out a little bit more so
that we can give some very clear
[2:45:50]
instruction to those that would be
responsible for um both evaluating and
[2:45:57]
and and exercising or executing the uh
the the the
[2:46:03]
plan,
>> right? It's like some duplication that
[2:46:07]
» Yeah, there's some crossover for sure.
>> There is, but it was categorized,
[2:46:10]
» right? There are some things we we
really don't have direct control over.
[2:46:13]
we the five of us annual reports, you
know, u website improvements, those are
[2:46:19]
not things we could actually fix or
complete, right? So maybe we just reorg
[2:46:24]
this a little bit so it's a little more
actionable.
[2:46:28]
» Yeah,
>> sure. I if can I jump in,
[2:46:31]
» please?
>> Please. I I think that any of these
[2:46:34]
require staff,
>> so it's not just the website or any one
[2:46:38]
of them. Um, so we're happy to give you
something or to have you all meet again
[2:46:44]
and come up with it on you tell us which
way you want to do that and we're happy
[2:46:48]
to move forward
>> right
[2:46:49]
» in that framework. It could be that we
bucket it by department head or topic,
[2:46:55]
you know,
>> so that we can identify things that live
[2:46:57]
in a few different areas as Wayne just
mentioned,
[2:46:59]
» right? um or that we identify needing
significant detail to get to what you
[2:47:05]
want
>> because the action items are things that
[2:47:07]
are a little more specific
>> whereas the larger list you know
[2:47:11]
provides a lot of context in a framework
but to get from here to implementation
[2:47:16]
» we would want more input from all of you
>> right because there's good there's a lot
[2:47:19]
of good stuff here I don't mean to say
that there isn't I just want it to be
[2:47:23]
thoughtful and really have impact so
that we do complete these things that we
[2:47:27]
say are priorities so I think
>> we just need a little bit more help.
[2:47:31]
» Could I suggest then that the five of us
respond back to this or maybe Nick, you
[2:47:38]
can set a template for us that we can
give you feedback as to what those
[2:47:43]
details are and then you consolidate
them maybe. Does that sound like a
[2:47:47]
reasonable second next step
>> and then we can review?
[2:47:52]
» Yeah, I mean otherwise we can bucket
them by category
[2:47:54]
» category or or department sort of.
>> Yeah. And then
[2:47:59]
» or you can
>> you can email me, I can meet with you.
[2:48:02]
It doesn't we we will take feedback in
any form. So
[2:48:05]
» yeah, I think what we have what speaking
from prior years, we have all come up
[2:48:12]
with
Marielen, correct me if I'm wrong, we
[2:48:15]
sort of all came up with our own version
of priorities and then we would all
[2:48:20]
scatter and do our own things, right?
And some people were more successful
[2:48:24]
than others
>> on getting those things to fruition. And
[2:48:28]
so I think what we're trying to do is
help Nick and other department heads
[2:48:34]
know these this is the will of the
board, not just an individual member of
[2:48:38]
the board or a small group of the board,
but this is more of these are the things
[2:48:43]
we should be focusing on. And sure,
other things matter, but the this is
[2:48:47]
what we've sort of stamped right now as
priorities,
[2:48:50]
» right? So, yeah, I think if we could
boil it down a little bit further,
[2:48:56]
um, that is probably going to be the
best way to action it.
[2:49:01]
» Yep. So, maybe Nick, you want to take a
stab at maybe just grouping it,
[2:49:05]
organizing it by category and, you know,
soliciting feedback?
[2:49:09]
» Yeah. Or what?
>> Sure.
[2:49:13]
» Like I said, I'm happy to email and have
you write it or we can
[2:49:17]
» Yeah.
>> sit down individually to get that
[2:49:19]
feedback. Okay,
>> great.
[2:49:21]
» Great.
>> Okay,
[2:49:24]
perfect.
Select board time.
[2:49:32]
Well, I can go first. I just want to uh
thank Nate, um Ameiliano,
[2:49:39]
Joe, and Ethan for running in at the
last minute and being able to put on
[2:49:43]
tonight's meeting. We had a lot of
difficult technical issues in the
[2:49:47]
beginning. So, if you weren't here, you
missed a
[2:49:51]
» circus.
>> Swap out of microphones.
[2:49:54]
» They did a great job and once again,
they're bringing to us. Um, I also uh
[2:50:00]
want to
bring to the attention of the town that
[2:50:04]
the Swam uh what is it? Swamcott
Performance Center is now open. They
[2:50:11]
opened on Saturday, which was nice. and
um think they're going to be open every
[2:50:15]
day now and we've got things moving
along and I just
[2:50:20]
» swaps center for performing arts
>> swaps center for performing arts right
[2:50:24]
or aka the old farm um things are going
on over there um we all received an
[2:50:30]
email on um we all received an email
from a resident we we received many
[2:50:36]
emails from residents but the one email
that really stuck out for me this week
[2:50:40]
was a resident who was commenting on um
the first day of school with the seniors
[2:50:45]
driving around and hanging out of
vehicles and putting making it um some
[2:50:51]
decisions that could have put them into
a pretty bad situation. And it seems
[2:50:57]
like that goes on every single year. And
I I would just like to ask Nick if you
[2:51:01]
could have a conversation with the
superintendent and the chief of police
[2:51:05]
and maybe there can be an organized
parade or something on the first day of
[2:51:10]
school to to um make sure that the
seniors get the attention and the the
[2:51:16]
fun that they have on the first day
going to school and also keep them safe.
[2:51:21]
But when the superintendent says this is
something that he's concerned about, the
[2:51:25]
principal says she's concerned about it,
the chief says he's concerned about it,
[2:51:29]
I just I'd like to see some action being
taken so that the kids don't miss out on
[2:51:35]
a great experience and we're not sitting
here a year from now with a tragedy on
[2:51:39]
our hands. So, um, that's all I have to
request and report.
[2:51:48]
» Anybody? Danielle, Ted, Wayne?
>> No. Good.
[2:51:51]
» At the last meeting, I made a comment
about transit oriented developments. My
[2:51:56]
comment was strictly in relation to the
permitting of that through the zoning
[2:52:00]
package that was done through a 40B
application, not an MBTA 3A zoning
[2:52:05]
package, not a 161A zoning package or uh
any of the other transit oriented
[2:52:11]
developments that statute allows.
Financing was not what I was
[2:52:14]
insinuating. So, I apologize if there
was any confusion. Marielle and I
[2:52:18]
apologize if there was any confusion
from my inarticulate response.
[2:52:22]
» Oh, that's me.
>> That's it. I would like to uh also
[2:52:29]
review a comment that I had made about
wanting to
[2:52:35]
get more information about those other
140 communities that were also not
[2:52:42]
» disallowed.
you know, the for us the roughly 200
[2:52:46]
something thousand. Um I I would like to
find more information what commonalities
[2:52:50]
there were. Um and you know, this is
where we do approach before we have to
[2:52:56]
take any type of expensive legal action.
But I agree going to Marky um and and
[2:53:02]
going to who or even to warn whoever
else will listen um to ask them
[2:53:08]
what the hell just happened here? Why
are we saddled with something that we
[2:53:11]
thought that we followed the rules that
we thought we were supposed to get and
[2:53:14]
now small towns like us have to, you
know, take on the take on the the brunt.
[2:53:20]
» Mhm. So,
>> uh, tri chair meets at 8 a.m. on Friday.
[2:53:27]
So, we'll be at town hall. Uh, we've met
once before. Again, we're meeting to
[2:53:32]
discuss theus and align them. Um some of
them are out of date and need updating.
[2:53:40]
um some of them need re-evaluation and
some of them need further consideration
[2:53:45]
and we will be um bringing I think I
think the conversation was a sort of
[2:53:51]
like a tri board meeting prebudget
conversation so that everybody could
[2:53:55]
come together again in the way we did
before so that we're recorded and have a
[2:53:59]
very clear understanding of what all the
questions on the table are um and
[2:54:04]
something to go back to when people say
what did we mean when we wrote that um
[2:54:08]
So, um, that's the plan. Happy to take
any feedback. Um, you guys can give it
[2:54:14]
to Nick and Nick will be there with me.
Patrick's going to join us, too.
[2:54:18]
» When is that again?
>> Try chair. It's 8:00 a.m. on September
[2:54:22]
11th, right before the memorial service
remembrance.
[2:54:29]
Okay. I'll take a motion to adjourn.
Second. All
[2:54:33]
» in favor? I I
>> Thank you.
[2:54:36]
» Thank you.