Agenda
Agenda: https://legistar2.granicus.com/castlerock-co/meetings/2026/6/4568_A_Town_Council_26-06-02_Agenda.pdf
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[2:09]
We got a email today and I have people asked this question before regarding a few
[2:13]
businesses in town and different things. A hotel of course David you
[2:20]
mentioned the hotel a little bit.
[2:23]
>> As you all know they received town Council both land-use and incentive approval
[2:33]
they were required to pull a permit by a deadline here in May and they met that deadline.
[2:45]
They probably will be back requesting for an extension of the deadline for completion but
[2:52]
they paid the I don't know, what was $27,000 permit fee for the foundation which was
[3:00]
required the project as a way to go as far as gettingstarted .
[3:09]
That's our understanding from communications and obviously the reaction we received from
[3:18]
the city hotel project on Ontario.
[3:21]
>> You got that earlier. >> Know I appreciate the
[3:25]
update. The way I help them with that there is complaints about of
[3:37]
course what a social club was and we had no money invested in that it's not something for
[3:48]
counsel to talk about that much the Douglas County school District building as a counsel
[3:58]
on this we are trying to figure out a way to say that building we will see what happens.
[4:04]
Again we will see what happens on that. And somebody asked about the
[4:08]
occupancy and frankly it is not really certain how many people are in that building.
[4:22]
They have met the obligation with the parking lot that is being used.That's great.
[4:26]
But, besides that, downtown County is thriving.We have councilmembers from other
[4:36]
states even visit counsel rock Castle Rock downtown on business field trip to see how
[4:43]
we are doing downtown it has really been impressive and we are still climbing up I think
[4:48]
that our smaller business community downtown is hopefully doing better all the time.
[4:59]
I know I can speak for a lot of downtown merchants.It is a hard go the way it is but I
[5:04]
think our downtown is doing well. As far as sales tax and just
[5:09]
seeing a ton of people downtown every weekend when I walked down over the last weekend for
[5:15]
my house we hung out the amount of young people and people hanging out is really cool to
[5:20]
see.I get that traffic can be hard and it can be crowded but it's better than not being
[5:28]
crowded. There is a lot of towns on the frontrange that would love to
[5:34]
have our problem , without councilmember Ryan Hollingshead.
[5:39]
>> RYAN HOLLINGSHEAD: No comment.
[5:42]
>> Thank you Mary. I received the same email and you know I think you addressed
[5:50]
the majority of the points very well and you know, where we have authority to be able to
[5:56]
affect private property and ask them to develop something I think the differentiator
[6:13]
between the private property further zoning the emails we are receiving are valid.
[6:50]
It's not always the category that was described. I think we are doing well and
[6:57]
driving that's all I have, thank you Mary.
[7:04]
>> Councilmember Davis. >> I think it was a month or so
[7:09]
ago some ideas. I don't know if they had treatment or so.
[7:23]
I'm just going to ask questions about that more parking in that building.
[7:28]
>> They have opened it up entirely.
[7:36]
>> Do a better job notifying the public the community about the availability of that but
[7:46]
also I know we are working on that. She has been working on some of
[7:55]
the wayfinding signage included in that. Thank you for bringing that up
[8:00]
and we will give you all including the councilmember an update on that.
[8:05]
I follow up on that. Maybe just an update in general yes, thank you really
[8:22]
interested in our budget to get out there June 9 at 4 o'clock so we all know we have an open
[8:34]
budget meeting. Friday the 14th let's remember our veterans a day again and
[8:40]
what that means and American region is going to be collecting flags.
[8:50]
Old flags that need to be retired, bring them on up or if you all have old flags bring
[8:56]
them to me. I get them to the right place to get them retired to.
[9:00]
Thank you very much. >> MAYOR JASON GRAY: Thank you councilmember Tim Dietz.
[9:08]
>> LAURA CAVEY: I want to add on a little bit to what Ãsorry I am a little bit under the
[9:18]
weather. What the mayor said. I know Barry Street social
[9:23]
isn't something that we are doing with today but if there has been any interest from
[9:28]
anybody on doing something with that piece of property?
[9:36]
>> I can't speak definitively if there has been. We've been working with owners
[9:41]
representatives to make sure that the fencing they have on that property is appropriately
[9:47]
secured and is not going to be an obstacle for sidewalk or hourly use.
[9:53]
When we have made inquiries we know that some of the ownership of the partnership that owns
[9:58]
that property has changed. We know that at different points the property has been on
[10:07]
the market so that somebody else might buy that, by that property.In all likelihood if
[10:16]
there is a new owner we would probably be back before the town because unlikely there
[10:23]
concept produced will exactly match the approved concept but other than that we haven't had
[10:30]
any discussions in regards to that I am very mindful of the fact that vacant spots in
[10:39]
downtown it is not a desirable look. It's not a desirable outcome.
[10:48]
And we want to find ways to encourage you and to move with expedition on that we don't
[10:59]
have any more abilities other than just contacting them to give status reports.
[11:04]
>> I appreciate it, thank you. >> No problem, you are good.
[11:13]
We are going to get through this fairly quickly so hopefully you can get better
[11:17]
soon. I have unscheduled public appearances.At this time it's
[11:29]
reserved for members of the public to make presentation to counsel items are not scheduled
[11:34]
on the agenda. The general practice counsel will not discuss or debate
[11:39]
these items. Counsel making decisions on these items presented during
[11:43]
this time. Refers to items or staff for follow-up.
[11:46]
Coming from the speaker which is 30 minutes total. Residents will begin priority
[11:50]
to town Council followed by nonresidents representing Castle Rock business and
[11:55]
businesses outside of town as time permits counsel is also assessing public comments amid
[12:02]
online at CR.gov counsel comments from 1 o'clock today to be included in public
[12:08]
record. I do have a few people assigned to speakversus John , get it
[12:13]
close. >> Great, thank you for having
[12:35]
me. In light of the recent Memorial day we want to thank everyone
[12:40]
who has served, appreciate you. From the perspective of a city or town, trails are a cash cow
[12:50]
they cost a fraction of what was paved or when a path or road was cost and they often
[12:58]
pay for themselves in two or three years. This is not wishful thinking I
[13:02]
have cited over 50 ask academic studies I've emailed those through every one of you
[13:08]
including a calculator that you can use to calculate the return on investment real-time based
[13:15]
on different assumptions. In other words you spend $1 million improving or building
[13:20]
not bike trails and the economic benefits pay for themselves over a short.
[13:25]
Of time. It would be likely that our breakeven would be even better
[13:29]
and quicker than average. Especially if you want to keep the rates down that is a good
[13:36]
idea too. Trails also show increased by home value.
[13:39]
Again not by estimation. I think by documentation. The economic benefits of trails
[13:45]
are not as good for crowded or trails that need maintenance. We have two developments coming
[13:54]
up adjacent to the max. Both the Brickyard and mothers landing.
[14:00]
Among all the amenities there's going to be 1500 residents. My concern is that so far as I
[14:05]
can tell there isn't even a plan to build a extra park bench.
[14:09]
I am here to talk about the singletrack trail and non-vibrators as well.
[14:14]
Some believe right now those 8 miles are crowded populations growing when building trails,
[14:28]
Castle Rock has historically partnered with nonprofits such as kava and it means our
[14:33]
capacity to build new trails and take on new projects is extremely limited.
[14:42]
The capacity to design trails, specialized software, organization, they can help us
[14:48]
apply for grants. Jeff Cho for example when they plan to build a trail convert
[14:53]
is a extremely important part of the trail that helps every step of the way.
[14:57]
I a couple of handouts to you about the room. There is plenty of room to
[15:04]
build trails calling a stack trail design which they use and I think I've cited 10 or 15
[15:11]
examples there. As I mentioned the new trails to be built would have to be an
[15:19]
investment and the economic studies please. Our trails could be the envy of
[15:38]
the front range. >> Yes sir.
[15:42]
>> Thank you. >> For my day job the concrete
[16:16]
contractors we are a heavy civil and commercial contractor throughout the state
[16:29]
qualifications and concrete. I worked in concrete construction for 20 years now.
[16:33]
I am a certified finisher and technician which is American concrete Institute.The board
[16:39]
directors and I have been certified and expert to testify at trial.
[16:43]
The reason I'm here is I have concerns due to the work that's being done improperly in the
[16:50]
neighborhoods and the taxpayers are paying for it. The main concerns are improper
[16:55]
tearing. It comes through coverage and the timing of this year.
[16:58]
Using exterior concrete. Damaging his existing stones adjacent to the work that is
[17:07]
being repaired and pouring concrete in the rain. The reason these concerns are
[17:14]
valid is improper tearing can lead to surface defects the town has to pay for in the near
[17:19]
future. These have been elevated recently since 2020 to when the
[17:24]
EPA regulated type I as a carbon reduction act. The concrete that's being
[17:30]
damaged outside of the town is paying for is a item now that the town is about to go back
[17:37]
and fix causing all the taxpayers more money. I witness these acts over the
[17:43]
last month in my neighborhood and adjacent neighborhoods taking photos, video extensions
[17:49]
by neighbors obviously curious and another concern I have is the difference in the new
[17:58]
specifications that are pretrade for public works. Our company does a lot of work
[18:02]
in the development area of Castle Rock and throughout the state and the development side
[18:12]
of Castle Rock holds four specifications for 100% if not more and should in my opinion.
[18:17]
The public worksite in my opinion when I watch it is loosey-goosey and put down any
[18:22]
kind of work they would like. Some solutions that I would like to see is the concrete
[18:28]
that's been improperly placed can be redone a payment reduction fee granted for the
[18:36]
work that is not an specification. And that the damage work
[18:41]
outside of the town's paper also be asked at no cost for taxpayers.
[18:46]
We solutions of the contractor is I would like to see unification between the two
[18:55]
different entities and Castle Rock and the specifications being enforced equally between
[19:00]
development and public works. As I mentioned I work in development and thank you for
[19:05]
your time. >> Thank you James.
[19:08]
I know as a counsel we pretty much ask the public works to get back to us with their
[19:11]
findings on this I imagine you willget a response from probably all of us as well in
[19:20]
public works . >> You live right down the
[19:29]
street from you so I am a councilmember. I'm more than happy to help
[19:33]
facilitate any to rectify whatever's going on.
[19:37]
>> I want to make sure you're treated fairly on the business side working with the upper
[19:46]
side of Castle Rock. >> Yes has the public works
[19:50]
department contacted you? They told me to contact you.
[19:55]
>> Yes they reached out to me I talked to him on Friday and even yesterday.
[19:59]
I've voiced the concerns. >> We are going to get this
[20:03]
response to this. I want to make sure we know what's going on thank you for
[20:09]
bringing your comments forward. >> Thank you.
[20:27]
>> KEVIN BRACKEN: I would like to think John. John that spoke about the trail
[20:31]
and the economic impact to Castle Rock. He approached me during our
[20:35]
open house this past winter and I encouraged him to present the town Council.
[20:40]
So he is very much following the process that was asked of him and if you could look at
[20:45]
this packet that he put together with special attention and maybe we can have parks and
[20:52]
look at it if he's talking about economic impact in getting more trails and perhaps
[20:59]
I was lost on the length of the speech but I just wanted to thank you for direction putting
[21:09]
this together and spending your time because that is the process that I asked of youand
[21:17]
it's a very common process . >> You know what we could do is
[21:24]
just ask if we wanted to as a counsel we could ask parks and record to follow up just a
[21:32]
little bit. >> At least we can get some
[21:34]
answers. That would be great. Okay.
[21:52]
Any follow-up with counsel is probably fine. Thank you.
[21:56]
If someone wishes to speak please approach the podium state your name and whether you
[22:01]
are a resident or a nonresident. >> Good evening my name is
[22:20]
Mark Neal I'm not a resident but I own Castle Rock ski we've been in town for 26 years.
[22:28]
I have a pretty unique history on the trail building and Castle Rock.
[22:32]
I've been involved pretty much with the town since day one we opened up and Castle Rock into
[22:38]
thousand there were actually 0 miles in the city of Castle Rock.
[22:41]
We now have approximately about 30 miles in a single track that's been developed and we've
[22:47]
done several big projects over the years with TS Miller obviously redlined weave action
[22:52]
been developed the little piece of property so I really am here to support John with the full
[22:59]
weight of Castle Rock as well as all of the other bike shops in town and the organization
[23:05]
which is a highschool . One of the things I think that is happened is we fully
[23:09]
developed the track over the years but we've got a population of pretty much
[23:14]
doubled since the last time any single track in the city of Castle Rock and Don is correct
[23:20]
and the point that we have plenty of property it is not a issue of actually how to
[23:26]
acquire more open space is more of a design issue and that is a stacked Luke situation we
[23:34]
talked about designing more trail networks on the existing property that we have.
[23:42]
Surface trails are a fraction of the cost of pouring concrete.
[23:45]
We don't know to pour a mile of concrete a little over $1 million these days.You can
[23:50]
cut a track for well under 100,000. And another thing that we know
[23:54]
is in the development of Castle Rock with the award-winning parks that we have one of the
[23:59]
biggest attractions is the single track service trail. That's one of the things that
[24:10]
has really developed and increased with property values in the Meadows and all around.
[24:15]
It's something I think the town really should consider. Another thing that really needs
[24:21]
to happen is parks and needs to take responsibility for the soft service trail network that
[24:26]
they have. Having been involved in all of the volunteer organizations
[24:31]
that help maintain the trails over all these years. It is something that the parks
[24:35]
and really needs to develop a soft service trail and managing those trail networks and not
[24:40]
really relying on a volunteer network because the trail network is going beyond the
[24:45]
capacity of any volunteer organization and network to assist in that.
[24:49]
So that is something I also encouraged that needs to be addressed with budgeting and
[24:54]
Parks and Recreation they need to have some resources available to really maintain
[24:59]
and develop those soft service trails because it's become the final jewel of Castle Rock.
[25:07]
Thank you very much for your time. I appreciate it and I
[25:11]
appreciate John bringing this issue forward before the Council.
[25:14]
>> MAYOR JASON GRAY: Think you Mark, appreciate it. All right, no one else if
[25:18]
someone wishes to speak approached the podium state your name if you are a
[25:23]
resident, nonresident or business owner you have five minutes to speak.
[25:26]
Seeing none. We are going to move to town manager report.
[25:31]
>> Good evening counsel I'm going to ask chief to come up. I want to provide just a little
[25:38]
bit of review of the after action meetings that some other law enforcement representatives
[25:52]
for the police department we attended a meeting with the state patrol C.Sheriff's office
[26:05]
and we talked about the May 15 accident and the resulting suggestion and the resulting
[26:14]
gridlock in the community we want to let you know that we are following up with them.
[26:21]
We haven't finalized the written document as far as actually report but one of the
[26:27]
things I wanted to let you know is that we did impress upon them the severity and the
[26:32]
significance of that incident on Castle Rock. They acknowledged that they di
[26:39]
, they heard loud and clear from us. The people that have to respond
[26:45]
to accidents in the Douglas County I 25 corridor or largely Douglas County residents and
[26:54]
Douglas County based. That is good in my opinion if they know the severity and the
[26:58]
importance of that issue. But we really talked about what are things that can be done
[27:06]
going forward and I really appreciated the discussion because it was really focused
[27:13]
on improvements and things that can be getting better and there are a number of things we
[27:19]
continue to work on. Interestingly enough there is a entire science of this called
[27:23]
10. Incident management where we are managing incidents on large
[27:32]
roads and they have people that have been involved at a national level in regards to
[27:41]
Tim. And all of the different protocols that come after that.
[27:48]
So there is a existing management plan we want to further refine it and obviously
[27:53]
improve it. There was a lot of discussion about the fact that there is
[27:59]
opportunities for improved communication. There is improved resource
[28:03]
sharing. We pointed it out to make sure everyone is the right people in
[28:11]
the room. We have drones, we have the camera systems that can take
[28:15]
appropriate photographs of a scene. We heard discussions about
[28:21]
their approved protocols so they can mark the move. Mark the incident where it
[28:28]
happened. Lose the damaged vehicles out of the way sweep it up and
[28:32]
move. There was a lot of issues and we can talk about how there was
[28:36]
officially a confluence of things that happened but in the afternoon, difficult traffic,
[28:42]
difficult ability and all of those kind of things but I think there was a really good
[28:48]
spirit of cooperation and opportunity with this in the future.
[28:52]
The people from C.were very helpful. They are operational minded.
[29:00]
They were not the ones to make the decision on how to spend C.on a road level.
[29:04]
I still think we need a lot beyond that. We know we are a lot reserved
[29:09]
in regards to the width and the capacity and the state highways that serve our community.
[29:15]
Whether it is 86, whether it is 83 Parker Road. All of those roads were
[29:22]
congested. And we all know that we spent a lot of time talking about that.
[29:29]
We did point out that we were very fortunate we didn't have life safety incidents that were
[29:42]
creating physical harm in regards to that.It is not a sufficient management plan.
[29:57]
We want to be better than that and you all agree with that. We didn't feel like we were
[30:05]
telling them things. We followed we were working with them to try to make sure
[30:10]
that we can avoid these if there's anything we want to add that we can respondto any
[30:27]
counsel questions . We have a strong partnership with the state patrol during
[30:40]
the debriefing and so we did identify a number of areas and opportunities to improve which
[30:50]
going forward we will be every able to do that. To provide a better level of
[30:57]
service so I am very pleased with the outcome.
[31:02]
>> Thank you, any questions or comments?
[31:13]
>> I want to say thank you for you guys doing that and working on it.
[31:18]
Obviously we all know it was a very big issue all of us got some sort of feedback or email
[31:23]
or something in response to what happens so the fact that we are being responsive my
[31:27]
favorite word proactive forward-looking so these types of things don't happen in the
[31:35]
future. I just want to say thank you.
[31:38]
>> Absolutely. Thanks everybody.
[31:43]
>> We will click through some of the cover on Ãas we've mentioned we do have a budget
[31:48]
open house on the ninth of June. Where we are going to talk
[31:56]
about how we can spend money but the first thing we want to do is how we do it right now.
[32:03]
Which is really what we are focused on where the beginning stages of developing the 2020
[32:09]
budget for viewers the budget is a calendar year budget by state law we have to adopt the
[32:16]
budget by the end of the year we will probably have it in a little bit in the fall but it's
[32:21]
a very important document is just where your priorities are and serves as marching orders
[32:26]
for 2027. It is an important document. You see some of the holiday
[32:32]
items the CNO conference.The mural dedication there. And fourth Street.
[32:46]
We are excited for independence there lead to hundred 50th birthday of our country and
[32:52]
later in the July we are going to be having the open space dedication and we are not yet
[33:01]
putting on the calendar but we hope, we have reason to believe that we are going to get a
[33:09]
northbound ramp with the crystal Valley interchange. Somewhere in this creek.
[33:14]
We will definitely let you all know when it happens. Next slide just remind you of
[33:19]
additional community engagement opportunities to involve the open houses for mayor and
[33:26]
council than the next slide provides us with a number of events that we've got going
[33:35]
that Mayor already mentioned there's a lot of other things going on you see neighborhood
[33:47]
meetings and a number of different items for the second time I will read all of those
[33:54]
straightforward a couple of Dawson trails some more miscellaneous property and the
[34:05]
spring is looking at some property they own which is very successful.
[34:09]
Housing projects as well. Next I'm going to point to the preliminary end of year 2025
[34:25]
financial review. Thedocument is in your pocket . Finally summarized we had a
[34:30]
good year of growth, of revenues which is sales tax. We did have a continued
[34:39]
slowdown of growth related to development. Impact fees, construction and
[34:43]
system development charges to perform as well as they have in previous years that happen to
[34:52]
adjust budgets and expectations accordingly. We had corporate growth and our
[34:57]
reserves funds that we need for cash management and other purposes and almost all of our
[35:02]
funds and the continued strong expenditure management from the department doing that.
[35:09]
At our next meeting you will receive the 2025 annual audit since you got additional
[35:18]
financial questions you can ask the auditors there as well. So I'm happy to respond to
[35:25]
questions. Percy is here as well if you got any questions regarding the
[35:33]
2025 financial report. >> Any questions for David?
[35:38]
>> Thank you David. >> Now we will hit on some
[35:41]
development activity highlights.
[35:44]
>> Good evening Mayor and town council members this is the first update.
[35:48]
I will go over a couple of new quasijudicial updates that have been submitted since our last
[35:54]
meeting. District 4 councilmember Davis district I live just north of
[35:58]
here at 512 north Wilcox. The renovations and changes but the exterior changes are next
[36:11]
to the design review board. So this could be a application that goes through the design
[36:17]
review Board. It's still a small project you are not adding square footage
[36:22]
to a level that would send it to counsel.I just wanted to make sure you are aware of that
[36:28]
project. Quasijudicial. This is a submitted rezoning on
[36:31]
the north end of town. This is really north of Parkway and East Home Depot Plaza.
[36:37]
So what is a total of 15 acres that covers currently two zone districts.Which is the same
[36:46]
commercial zoning on the shopping plaza to the left and then Alexander place on the
[36:51]
southern end has zoning that was a number of years ago for a continuum of care and living
[36:59]
uses. A current proposal is to combine the area in blue to one
[37:05]
news zone district and they are proposing 50 single-family homes.
[37:09]
That is under staff review. It will as it moves its way through the process has come
[37:15]
for future public hearing for the formal quasijudicial application this is planning
[37:28]
areas two and three. This is for site development plan and 64 acres highlighted
[37:32]
in blue and the founders Parkway as you can see north through the neighborhood.
[37:38]
Through this first parcel which was up, not down into the trees the main area taken into the
[37:49]
road proposing a site plan for 133 single-family homes including 20 9/29 acres of open
[37:54]
space access will be provided on founders Parkway and driving with Crimson sky Drive.
[38:04]
That again was just found into its first and they take a number of rounds of staff
[38:12]
review before they are ready to go all of these will have an additional set of neighborhood
[38:20]
meetings. The rest is they are not formal applications yet it doesn't
[38:31]
mean these projects will all move forward or they need a public hearing process this is
[38:35]
their opportunity to ask staff questions about what would be in district 1 councilmember
[38:41]
Hollings district Ryan Hollingshead's district is close to paintbrush Park they
[38:54]
arty have a caring and learning center. This is a different user so
[38:58]
they've got a different layout so they are looking to see what needs to be changed and amended
[39:03]
on the plan. It shares an access to the north.
[39:07]
District 3 councilmember Kevin Bracken's district the flight development plan that's already
[39:16]
been improved for a restaurant this parcel is just south and so they are looking for
[39:26]
elevation changes for that. Asking staff what is the process and what do they need
[39:31]
to do to move forward? American Academy charter school is looking to make some
[39:36]
playground updates including new shaded shelters they are located west of Prairie House
[39:42]
Drive and district four councilmember district has a pre-application just under 2
[39:47]
acres of land right along front Street and black feather apartments from the
[39:55]
single-family home that is the proposal or request for information from KinderCare
[40:02]
early childhood education playground. And Promenade we had a
[40:07]
pre-application for a same block that a lot of the apartment complexes RN next to
[40:17]
the lazy dog site that is from site work but not building up. In the application I try not to
[40:26]
always listen because we don't know if they will come to flourish and but the restaurant
[40:31]
is one of them. Event care and then that is what they are looking at doing.
[40:40]
Just across the street from not looking at the other adjacent, excuse me the other vacant
[40:49]
parking to put up a 50,000 medical office. Off of atrium Drive.
[40:57]
South Highway 85 across from my 25 in a area of the Pine Canyon and extension the waters
[41:08]
facility Lightner equipment rental is going through the pre-application process you
[41:15]
have to understand to do a development there this land I don't know that it's labeled so
[41:28]
it's got a light industrial zoning on it.
[41:31]
>> Happy to answer any questions you may have.
[41:34]
>> Councilmember Brooks. >> MAX BROOKS: Mr. Mayor if you could come back to slide number
[41:45]
five. I'm just curious, 50 homes is certainly not on the meter of
[41:49]
impactful from a density standpoint.I'm just curious I'm pretty familiar with that
[41:53]
area it's not my district I don't want to put my nose in somebody else's district but
[42:01]
I'm just curious. Would something like that have any sort of requirement for
[42:05]
road improvements? Again understanding that 50 homes is not particularly
[42:10]
impactful but that area is a really narrow road.
[42:14]
>> Through review we look at traffic studies for every application and when a property
[42:22]
is going through a rezoning they look entitled already for a certain use and it's probably
[42:31]
how the developer it's how they got to the homes and not something larger it's probably
[42:39]
how they got to the entitlement uses and that can be more impactful.
[42:50]
That is under staff review now. I can't definitively say if they met that mark or not at
[42:55]
this point but their intention was to demonstrate that this proposed use was either equal
[43:00]
intensities or lesser intensities to the commercial uses that were on the northern
[43:04]
strip of the property. I should say the commercial entitled usage right?
[43:08]
It had been built yet.So the entitled use and I believe the Alexander piece with the
[43:13]
continuing care was 125 or 136 but obviously not all of those residents were driving.
[43:20]
So again, that is under review but typically in these cases staff looks at what was
[43:26]
currently entitled on the property are they proposing the use that is more or less than
[43:30]
10 and what would be the appropriate mitigation to request based on that.
[43:36]
As of rezoning, counsel and planning commissions of the recommendation but counsel is
[43:41]
never required to approve a rezoning but that part of what staff looks at is weighing.
[43:48]
Andobviously what the landowners are developing with gap .
[43:52]
>> There's been some other changes growing a large Congregational Kerch church in
[44:01]
that area as well. >> LAURA CAVEY: I have the same concerns as Max.
[44:15]
I actually go to that church that Max mentioned and that area in general, when we talk
[44:19]
about Alan way and that whole area where Home Depot and sprouts is very congested
[44:25]
already. So, when you talk about the north end currently today it's
[44:30]
zoned commercial. Is that correct? So they are wanting to remove
[44:37]
commercial zoning and at in 50 homes?>> TARA VARGISH: Remove both the commercial zoning and
[44:47]
I believe it is the 125 to 136 units. So take both of those uses away
[44:51]
and just the back of the 50 single-family to be clear. Because of quasijudicial I just
[44:56]
want to say I'm not asking for any opinions or recommendations from you all because we haven't
[45:02]
had the public hearing at but happy to continue to answer questions.
[45:06]
I just want to make sure it's clear that they are proposing to eliminate the current
[45:11]
commercial zoning and the hundred plus units of continuum of care with just single-famil
[45:17]
homes. >> I'm only asking questions .
[45:19]
So the continuum of care is that kind of like a apartment building or something along
[45:25]
that line sort of homes before? >> TARA VARGISH: Yes the zoning currently allows some
[45:31]
independent patio homes and some age restricted multifamily and I believe it has proposed
[45:37]
or envisioned at the time of third billing that would actually have a memory care
[45:45]
use. Really a place you could age in place.That was part of the
[45:49]
original zoning. It is my understanding that property owner hasn't
[45:53]
successfully been able to attract that type of use and that's why they looked at a
[45:57]
number of uses on these parcels for years on the commercial piece for landscape businesses
[46:05]
to have the rocks here in the mulch here and the gravel there in the plants over there.
[46:09]
So we give a lot of different ideas on parcels but this is actually a formal application.
[46:16]
>> LAURA CAVEY: Okay thank you. >> MARK DAVIS: I always ask you a question about widening roads
[46:23]
and that kind of thing.I see there is grading going on next to that.
[46:28]
That one is Artie started right? >> TARA VARGISH: To the north
[46:31]
of this property is Alexander way because they like to pick names that are similar when I'm
[46:37]
in front of you all. So there is that project north of this.
[46:41]
Are you talking about a different location I just want to make sure I understand.
[46:49]
>> Right about that. North of that one. >> TARA VARGISH: That project
[46:54]
had a site developed a plan already. Seven homes, 55 are custom
[46:57]
lofts and 22 our live work units that they are putting in roadinfrastructure, water
[47:07]
infrastructure and all of that . >> MARK DAVIS: Out with the
[47:16]
combination of that one do they need to widen the road at all? >> TARA VARGISH: It has not
[47:21]
triggered any requirements to widen it because the numbers are below threshold.
[47:26]
>> MARK DAVIS: In Douglas County if that one ever gets annexed and will they have to
[47:30]
widen that road? >> TARA VARGISH: They shouldn't have to unless they brought in
[47:34]
a really proposed a mega dance use and then that would be determined at the time of the
[47:40]
rezoning. >> MARK DAVIS: All right, thank you.
[47:43]
It'sdoing any other questions for CARA ?
[47:48]
>> That concludes my report. Thank you. >> MAYOR JASON GRAY: Moving on
[47:55]
to town committee report. Thank you Caitlin. Moving onto the acceptance of
[48:02]
the agenda. No changes or additions to the agenda and accepted the agenda
[48:05]
as protected will be accepted. I have a first by councilmembe Bracken and Halling stated .
[48:11]
Any other discussion? >> MARK DAVIS: Yes.>> MAX BROOKS:Yes.
[48:23]
>> TIM DIETZ: Yes . >> MAYORJASON GRAY: Yes . >> Motion passes unanimous.
[48:27]
>> MAYOR JASON GRAY: Moving onto the consent calendar. Reviewed by counsel will be
[48:36]
voted on single motion of discussion. Any member of Council weight
[48:40]
may remove ordinance 26 Ã18 ordinance amending 13.15.080 of the Castle Rock Municipal
[48:47]
Code Prohibiting Common Interest Communities from Enforcing
[48:52]
Watering Requirements for Landscaping During Drought Conditions
[48:58]
7. RES 2026-062 Resolution Approving On-Call
[49:02]
Services Agreements with CMH Concrete Pumping Inc., KRM Concrete LLC, and Sabellb
[49:06]
Civil and Landscape LLC, for the Minor Miscellaneous Pavement and
[49:11]
Sidewalk Repair Program 8. RES 2026-063
[49:13]
Resolution Waiving the Formal Written Bidding Requirement on the
[49:17]
Basis of Sole Source and Approving an Equipment and Services
[49:22]
Acquisition Agreement with LLJMWT LLC d/b/a L.L. Johnson Distributing Company,
[49:30]
incorporated for Red Hawk Ridge Golf Course Equipment
[49:33]
9. RES 2026-064 Resolution Approving the 2026
[49:35]
Water Lease Agreement Between the Town of Castle Rock and
[49:39]
Riverview Farms 10. RES 2026-065
[49:47]
Resolution Approving the 2026 Water Lease Agreement Between the
[49:51]
Town of Castle Rock and Sublette, incorporated. [Morgan County, Colorado]
[49:57]
11. RES 2026-066 Resolution Approving the Third
[50:00]
Amendment to the Services Agreement Between the Town of Castle Rock and Burns &
[50:04]
McDonnell Engineering Company, incorporated for the Front Street
[50:09]
Downtown Connection, RWRWTC Pump Upgrades, and Liggett Road Pipe Upsize Projects.
[50:14]
[Ray Waterman Regional Water Treatment Center; various locations throughout
[50:18]
Castle Rock, CO] 12. MIN 2026-016 Minutes: May 19, 2026 Town Council Meeting
[50:22]
I will accept emotion. >> Motion for the consent
[50:26]
calendar. >> MAYOR JASON GRAY: First on councilmember Brooks second on
[50:32]
councilmember Davis any furthe discussion? >> RYAN HOLLINGSHEAD:Yes .
[50:36]
>> KEVIN BRACKEN: Yes . >>MARK DAVIS: Yes . >> MAX BROOKS: Yes.
[50:40]
>> TIM DIETZ: Yes . >> LAURA CAVEY: Yes. >> MAYOR JASON GRAY: Aye thank
[50:45]
you. >> MAYOR JASON GRAY: Moving onto public hearing and
[50:54]
discussion action items. Public comment we will take on these items number 13 ordinance
[50:59]
2026 Ã17. Ordinance Amending Various Provisions of Title 15,
[51:15]
Articles 1 and 2, of the Castle Rock Municipal Code; Adopting by Reference as
[51:20]
Primary Codes the 2024 International Building Code, 2024International Residential
[51:24]
Code, 2024 International Mechanical Code, 2024 International Plumbing
[51:28]
Code, 2026 National Electric Code, 2021 International Energy Conservation Code, 2023
[51:33]
Colorado Model Electric-Ready and Solar-Ready Code, 2024 International Fuel Gas
[51:38]
Code, 2024 International Fire Code, 2024 International Existing
[51:42]
Building Code, 2024 International Swimming Pool and Spa Code,
[51:46]
2022 Safety Code for Elevators and Escalators, 2020 Safety Standard for Platform Lifts and
[51:52]
Stairway Chairlifts, 2023 Safety Code for Existing Elevators and
[51:56]
Escalators, 2021 Automated People Mover Standards and 2017
[52:02]
Accessible and Useable Buildings and Facilities Standards, each with
[52:06]
Amendments thereto; and Providing for the Emergency Adoption of
[52:10]
this Ordinance on Second and FinalReading.
[52:16]
>> Thank you Mayor and Council. I do think that was the longest ordinance title I've ever asked
[52:22]
you all to read. Thank you. As you indicated this is the
[52:26]
same set of codes that were before you two meetings ago and tonight we are back on second
[52:36]
reading. We are seeking emergency adoption on the second reading
[52:39]
so they may be effective on June 30 which is just slightly less than 30 days from
[52:45]
tonight's meeting. And nothing else has changed from our presentation we are
[52:49]
happy to answer any questions if you have them otherwise at the proposed motion for your
[52:54]
consideration.>> MAYOR JASON GRAY: Any questions? Seeing none.
[53:06]
I will open for public, if anyone wishes to speak approach the podium and microphone
[53:12]
please state your name whether you are a resident, nonresident or business owner.
[53:17]
Seeing none we will go back to town counsel for further discussion and a possible
[53:21]
motion. >> I first of all want to thank
[53:23]
John for all of the work on this in the board of appeal they've done all of this stuff
[53:28]
and checked in on all of it so they've done the rest of what they want to do I move to
[53:34]
approve the ordinance on the second reading as a emergency measure
[53:38]
>> Second. >> MAYOR JASON GRAY: A first by counsel number RyanHollingshead
[53:42]
and asecond by Council member Davis. Any further discussionRoll
[53:46]
call vote please . >> RYANHOLLINGSHEAD: Yes .>> KEVIN BRACKEN: Yes .
[53:50]
>> MARK DAVIS: Aye . >>LAURA CAVEY: Yes . >> MAYOR JASON GRAY: Aye .
[53:54]
>> Motion passes unanimously. It. >> MAYOR JASON GRAY: Thank you.
[53:59]
Moving onto number 14 14. DIR 2026-016 Discussion/Direction of Applications for the
[54:03]
2026-2027 Art and Culture Grant Program Maya Yates.
[54:16]
>> MAYA YATES: Good evening Mayor and Mayor pro tem counsel.
[54:19]
Thank you for the opportunity to be here to present the discussion action item for the
[54:24]
2026 Ã2027 are in culture grant program. Just a quick reminder on the
[54:29]
background this grant program is annual. It is funded through the public
[54:33]
park fund and the goal is really to provide vibrant art and culture opportunities for
[54:38]
our community to implement. So we provide funding to a variety of organization and
[54:45]
nonprofit businesses and local artists and the street grant categories and vehicles.
[54:51]
The program grants up to $10,000 of funding project grants and educated grants up
[54:57]
to one councilman. This year we received a total of 16 applications and then a
[55:06]
grant panel consisting and town staff and counsel reviewed the submitted application using a
[55:16]
adopted grant rubric. After that process the panel is recommending a total of 14
[55:23]
applications for approval of the two grants that are not being recommended there were
[55:29]
concerns expressed regarding the insufficient alignment with the grant category requirements
[55:36]
for a lack of finalized project details or project impacts with the amount of it being
[55:47]
requested.Once approved by counsel the funds will be distributed this summer than
[55:51]
the grants must be completed by the close of next year.The panel is recommending a total
[55:57]
of three educated grants and two for Christian Academy the request for $790 that purchase
[56:04]
support the direct purchase of Apple pencils and those would enhance instruction in the
[56:13]
classroom through digital restriction and also traditional drawing.
[56:19]
Counselor Christian Academy also requested $1000 to purchase what's called a Trump
[56:24]
saw and supported supplies so these are safe cutting tools that allow students to cut
[56:32]
cardboard and other lightweight materials for hand on design project model building and
[56:39]
collaborative learning activities. In Renaissance secondary
[56:44]
schools requested $1000 to support the purchase of a Japanese coach.
[56:49]
They will use this and classroom for hands on experience and also in
[56:54]
performances at their school. We reviewed the total, we are recommending a total of eight
[57:01]
projects they requested $5000 to support the installation of a mural this would be placed on
[57:10]
the south side of their building adjacent to the parking lot local artists then
[57:14]
had requested $5000 this would be placed in the breezeway between Terry Street and the
[57:25]
parking lot behind lost copy downtown. So in the parking lot breezeway
[57:29]
you can see what is depicted kind of a three-dimensional image on the opposite side of
[57:35]
the breezeway the butterflies and birds and the artist did provide a letter of support
[57:42]
from the building center so she did kind of secure that approval.
[57:50]
Another mirror request after $5000 she owns a local hair salon near eight and Wilcox.
[58:04]
Located on the south side of that building. While the blue yonder has
[58:12]
requested support of $5000 to complete a wing installation this kind of mockup that you
[58:17]
see I believe the intent is so it could be placed outside their business as well as
[58:25]
inside their business but their goals are basically to promote community engagement with the
[58:32]
art as people visit Castle Rock and visit their establishment. Another similar wing project
[58:38]
request came from the home to stay total requested for 5000 they would complete a winged
[58:43]
mural installation kind of similar on their property or their structure at life at home
[58:49]
and this led similarly to the project enhance community engagement coffee three Ãthree
[58:57]
requested $5000. This was to support the construction and installation
[59:02]
of a mental sculpture you can kind of see the image depicted in front of you.
[59:08]
This would be created by a local artist same as Matthew and it would be composed of
[59:13]
steel and aluminum. The Castle Rock police K-9 Association requested ranch
[59:23]
support in the amount of $10,000 however the panel is recommending $5000 because they
[59:29]
felt that the grant application aligned with the project grant category as opposed to the
[59:35]
program grant category. The funding would go to supporting the creation of a
[59:39]
bronzed sculpture called sit, stay and heal. This would be incorporated into
[59:44]
a planned seating area near Perry Street and second Street and downtown Castle Rock.
[59:52]
>> Local artists requested $5000 to create a project called everyone is a artist.
[59:59]
This would essentially create a little free library at Cantrell school.It would also allow
[1:00:06]
residents to share access to these created materials and provide a community chalkboard
[1:00:16]
and the community art gallery. These are our three programs recommended to support $4900.
[1:00:23]
This would go towards supporting Republic concert series accessible to the
[1:00:31]
community. The Castle Rock orchestra requested $500 to support a
[1:00:34]
single concert that would be offered to the community of Castle Rock each year and then
[1:00:39]
at last your request came from the arts project in the amount of $10,000 the programming for
[1:00:47]
the team performing arts senior moving outreach classes an community exhibition that would
[1:00:52]
all be free and accessible to the community as well. My apologies.
[1:00:58]
The total budget impact the requested amount again does include that $10,000 request
[1:01:04]
from the police Association that was recommended to be allocated to 5000 instead.
[1:01:12]
You need the grant category requirement the total being recommended for approval this
[1:01:18]
evening $58,190 the grants will be distributed again this summer and this was in the
[1:01:23]
adopted 2026 budget through the public art fund so we have a couple of motions.
[1:01:34]
Wanting to approve the proposed grant award that's presented an alternate motion as well.
[1:01:39]
Happy to answer any question. >> Mr. Mayor, thank you.
[1:01:45]
Great job on just working through the application process and presenting this it shows
[1:01:53]
that there is a lot of interest really nice job putting everything together I do have
[1:02:03]
some queasiness that I want to talk through. It's not directly attributed to
[1:02:08]
the speed at which I eat my salad it might partially be that but I think this is
[1:02:13]
something that we can work through it has just been kind of laying on my mind the idea
[1:02:21]
of enhancing private businesses or even the private businesses are requesting the grants which
[1:02:32]
could be directly impacting the area around their business to bring more attraction to their
[1:02:42]
business walk me through that because the way I'm looking at it is that we are taking money
[1:02:50]
from Castle Rock through your organization and granted that is through actual good projects
[1:03:01]
if you are considering but yet still taking that money to enhance businesses that could
[1:03:06]
benefit whether it be your coffee shop or a mural on the side of the building.
[1:03:12]
Help me through that piece of it because there seems to be a little little bit of a conflict
[1:03:17]
there that I'm not so certain. >> I think that's a good
[1:03:23]
question. I think the intense of the grant program initially were
[1:03:27]
really just to provide those opportunities to local businesses or nonprofits or
[1:03:33]
whomever right? To enhance their property with art.
[1:03:38]
So I think it kind of stems back to earlier discussions. I think at one point Castle
[1:03:44]
Rock residents were presented with the opportunity because we didn't want our money going
[1:03:54]
outside of the Castle Rock community. I think the public art
[1:03:58]
commission the art and culture to really define the social fabric so these types of
[1:04:03]
installations the people on the public art commission are very passionate about culture but
[1:04:13]
when you think of communities across countries that people love they are inherently
[1:04:18]
created communities the created restaurants and art streams the Castle Rock special the
[1:04:34]
community events because people love going out and experiencing that music, that culture.
[1:04:40]
So I think that was the intent of these grant programs to kind of just help catalyze these
[1:04:46]
opportunities the other side of these opportunities is that it's giving businesses kind of
[1:04:53]
public funds to enhance the establishment the question is a valuable use of public funds in
[1:05:07]
the public werecommission obviously believes it is you all set the tone .
[1:05:12]
>> I think I could argue with myself that some of these areas just tend to be higher traffic
[1:05:19]
by virtue of them being the higher traffic locations you give us a opportunity for
[1:05:26]
people to get with you the projects. I would just recommend to be
[1:05:30]
sure not that I am implying in any way whatsoever in this particular realm but I would
[1:05:37]
just encourage very transparent process to make it very clear that we are not trying to pick
[1:05:46]
winners and losers as far as the decision we are trying to sport in one way or another
[1:05:50]
this is only transparency to the level of painful. I think that will help persuade
[1:05:55]
may be some fears anybody might have.
[1:05:57]
>> Yes definitely. Our panel did kind of put together a rubric.
[1:06:04]
So when we went through and analyzed and assessed the application you know we were
[1:06:09]
asking, we have a couple people on the panel and they are very adamant that we full heartedly
[1:06:17]
think to be a good representative and because if you have to ultimately be
[1:06:24]
accountable. >> And David followed by
[1:06:29]
questions from councilmember Ryan Hollingshead before public comment.
[1:06:35]
David? >> Councilmember Brooks,
[1:06:37]
earlier, the mix of public good and private is not necessarily a new precedent in regards to
[1:06:46]
some community expenditures. Preservation grant, money from the town.
[1:06:54]
For faC'ade grants the improvements at the Masonic Temple at the CafC) they set th
[1:07:06]
physical improvements on the faC'ade to help that business but also as a public good that
[1:07:11]
we see as well. As Maia as indicated altered to way that public good as well.
[1:07:22]
Thank you. >> Thank you David. Lex I do agree to a certain
[1:07:28]
extent like some of these grants they benefit that whole building right?
[1:07:37]
For example I go to copper Falls and they lock down the hallway.
[1:07:45]
>> Man did you have a question? >> So, to Max's point that
[1:07:52]
helps the whole community as some of the others are directly helping those businesses.
[1:08:00]
My question is, out of all that we talked about I think 58,000, 68,000,63,000 , how much money
[1:08:10]
do we have? Right now that we can offer in thesegrants ?
[1:08:16]
>> We have up to $85,000 allocated to these grants. Last year we received 17
[1:08:21]
applications but we only distributed about 35,000 and improved seven.
[1:08:26]
So this year we did get a much higher quality of application and redistributing the funds
[1:08:35]
but we do have some additional funds. >> Okay.
[1:08:38]
Thank you. >> I think there is not a lot
[1:08:49]
of blank space they on that property but they are also going to maintain it once it's
[1:09:01]
up. I will also have some skin in the game with it.
[1:09:04]
When we put a sculpture like the bear up there we've got to maintain that forever so there
[1:09:08]
is a cost to that. We get a lot of bang for our buck I guess when we are asking
[1:09:13]
people to own it. >> Councilmember Davis?
[1:09:30]
>> Is it in the contract paying on somebody else's building that they may maintain?
[1:09:34]
>> To implement grant agreements for the program. So our attorney office.
[1:09:40]
It is kind of what they are delivering a service redefining those details within the
[1:09:45]
agreement that are executed between the talent and grant application.
[1:09:51]
Whatever the word is. Does that answer your question?
[1:09:59]
>> The grant peace to get it done and the owner of the building is responsible for
[1:10:04]
taking care. >> We also I think going
[1:10:06]
forward just because these programs are new we don't want these projects to look bad in
[1:10:11]
the future so at some point we may need to adjust the grant program to be available for
[1:10:17]
maintenance but I think that is a question we will have to cross down the road.
[1:10:21]
It is a great point though. >> Any further questions for
[1:10:27]
Maia? >> I have one question for my and Dave and Caitlin.
[1:10:35]
So, this is vetted through the business owner and building owner?
[1:10:39]
>> Yeah. In some cases she applied and as the grant person applying
[1:10:48]
the business owner like a artist applying to put a mural on a building and someone else
[1:10:58]
we do require they provide site approval so we have a letter that is part of the Henry
[1:11:04]
application giving them that permission to use his , to use that property.
[1:11:09]
>> Thank you. David Caitlin one of the art is on a building that I occupy.
[1:11:19]
I own a building that I do occupy I just want to make sure I want to make sure it's okay
[1:11:26]
for me to go for it. >> The whole conflict of
[1:11:34]
interest I think it is the whole perception issue may be do a motion to approve all of
[1:11:39]
them except that one and then just so you don't have that perception.
[1:11:49]
Because it really gets into that beginning question as to whether or not there is public
[1:11:55]
benefit and also a private benefit it is probably a little bit of both.I don't think you
[1:12:06]
are going to have a business because of a mural somebody may make that argument.
[1:12:12]
It's probably better just to start off that way. To start a legal conflict
[1:12:19]
because you are not financially benefiting. To my understanding.
[1:12:29]
>> I appreciate that. I just want to make sure if it comes to a motion I will ask
[1:12:34]
for that want to be excluded amending after. Councilmember Tim Dietz.
[1:12:40]
>> TIM DIETZ: Was your follow-up process to make sure it's completely correct?
[1:12:50]
>> We again work with the town attorney's office to execute grant agreements and then we
[1:12:55]
kind of give them a lot of timeframe reporting at the end of that program so we have a
[1:13:05]
reporting document that we will send to all of our applicants this year and next year and be
[1:13:11]
happy to come back and present those supports to you all so we can really see the end results
[1:13:17]
of the judgment. >> Questions from counsel.
[1:13:30]
>> Seeing none if someone wishes to speak approach the podium and resident business
[1:13:36]
owner. You have four minutes to speak. Seeing none we will go back to
[1:13:46]
town Council for discussion and a possible motion.
[1:13:50]
>> I would personally like to amend this motion I feel like we should give the 10,000 to
[1:13:55]
police, they are already strapped for cash you know, Buttercup and all of the dogs
[1:14:11]
in the community and I think it is a wonderful thing for us to be able to do that is something
[1:14:17]
that's necessarily helping a business that's showing our commitment to Arkham Police
[1:14:23]
Department and to those service dogs.I don't know how counsel feels about changing it back to
[1:14:28]
the 10,000 but I would like to do that. >> MAYOR JASON GRAY: I think
[1:14:35]
when it comes to time we can move the application of the following positions.
[1:14:40]
I think that would be appropriate. And we list the following
[1:14:45]
conditions without and with removing the cap for studios. If it comes to that motion.
[1:14:59]
>> Of the money is not going to the dog program the money is going to the art program
[1:15:04]
associated with the dog program? I'm missing your point.
[1:15:08]
See want to support the artwork or the dog program?
[1:15:19]
>> I kind of have a similar feeling I love the idea it does feel a little bit like picking
[1:15:26]
winners. I love art. But at the same time I think
[1:15:40]
councilmember Halling had a good point that most of these have cost a lot more than a
[1:15:46]
grant. With that we could do a motion with the applications in the
[1:15:57]
following conditions. We may be willing to do that. Mayor pro tem?
[1:16:16]
>> I moved to propose the following grant award. Place it at 10,000 where the
[1:16:21]
sculptures and to remove the one, to remove desert jewel from the overall vote and make
[1:16:34]
it a separate motion. >> We have a first from Mayor
[1:16:40]
pro tem Laura Cavey. It further discussion, roll call vote.
[1:16:46]
>> RYAN HOLLINGSHEAD: Yes. >> KEVIN BRACKEN: Yes. >> MARK DAVIS: Yes.
[1:16:51]
>> MAXBROOKS: Aye . >> TIM DIETZ: Yes. >> LAURA CAVEY: Yes.
[1:16:55]
>> MAYOR JASON GRAY: Aye. >> Motion passes unanimously.
[1:17:02]
>> MAYOR JASON GRAY: I moved to approve the desert jewel application.
[1:17:06]
I will remove myself from the vote. Technically I'm supposed to
[1:17:12]
leave the room. >> LAURA CAVEY, MAYOR PRO TEM: Roll call vote.
[1:17:29]
>> RYAN HOLLINGSHEAD: Yes. >> KEVIN BRACKEN: Yes. >> MARK DAVIS: Yes.
[1:17:37]
>> MAX BROOKS:Your one shining moment yes . >> TIM DIETZ: Yes.
[1:17:42]
>> LAURA CAVEY, MAYOR PRO TEM: Yes.
[1:17:46]
>> Motion passes six Ãzero. >> MAYOR JASON GRAY: Thank you my ad.
[1:18:00]
15. ORD 2026-019 Ordinance Repealing and
[1:18:03]
Reenacting Chapter 2.01 of the Castle Rock Municipal Code Regarding
[1:18:07]
the Conduct of Town Elections. >> Thank you Mayor and town
[1:18:19]
Council. If you give me just a second I got to finish up this vote.
[1:18:26]
Okay. Alright so I wanted to provide you a update on this provision
[1:18:31]
to the election code the town attorney presented this at the last meeting for discussion and
[1:18:42]
we are presenting it to you tonight for the first reading. So, just an overview we were
[1:18:50]
replacing existing codes, the articles two through four currently addressed mail ballot
[1:18:58]
coordinated elections and article six and seven address election controversies these
[1:19:04]
articles echo state law currently and we recommend adopted by reference rather
[1:19:09]
than Ãagain in our code. We recommend adopting the two statutes what we currently
[1:19:24]
refer to as title I which governs our regular elections that we coordinate with the
[1:19:28]
County and title 31 governs any special elections that the town conducts.
[1:19:32]
What I want to point out is that our town remains able to have our powers so anything
[1:19:45]
that is in state statute that we don't want to adopt we have the ability to amend our code
[1:19:52]
and not adopt those certain things. As a reminder we retain our
[1:19:58]
role of the election commission we retain our nomination petition process and we are
[1:20:04]
changing a couple of deadlines that they coincide with coordinating the election in
[1:20:08]
the we added recording and independent expenditures which we did not
[1:20:13]
have previously in our code and we are retaining the registration reporting for
[1:20:20]
issue committee. We didhave to report , raise the reporting limit of the
[1:20:25]
issue committees based on recent rulings that used to be 2500 and it is now 5000 that
[1:20:31]
they don't have to report until they reached that $5000 level. We would still retain the
[1:20:39]
ability to process the complaints by the town clerk's office.
[1:20:43]
We also are proposing a new article which covers citizen petition this was previously
[1:20:52]
just referenced in state statute and so anytime you have anyone of these petitions we
[1:20:59]
would go to thestate statutes , the problem with that is every single petition has different
[1:21:08]
formats for the petition. Theyhave different deadlines, they have different curing
[1:21:13]
periods , they have different circulation periods so it's really confusing for citizens
[1:21:21]
to put a petition on the ballot. A petition to get an item on
[1:21:24]
the ballot.Doug is we bought those all into the code and standardize that process.
[1:21:33]
That is what we call petition and home rule charter amendment, and mission ignition
[1:21:41]
of ordinances and whatthey consider in a referendum. Those are the four types of
[1:21:46]
petitions . That standardized process we added that we have a standard
[1:21:50]
petition form that we will cover all four different types of petition we've set deadlines
[1:21:55]
in the process. We added that the clerk provide the petition form previously if
[1:22:02]
you have to go in and try to interpret statutes to create a form.
[1:22:09]
There was a ton of back-and-forth because they wouldn't get it right, they
[1:22:14]
wouldn't get the font size right. It's crazy all the different
[1:22:18]
types of requirements there are for each petition. So we're just going to make it
[1:22:23]
easy and provide the form for them and we have retained the specific requirements that are
[1:22:29]
in our charter and we retain the fact that the town clerk determines the sufficiency for
[1:22:34]
each petition. If the petitions are sufficient then they go to counsel to
[1:22:37]
accept and move it here on the ballot. So you could adopt for instance
[1:22:48]
and you agree that you could just approve and be done with it.
[1:22:51]
If you don't agree with it you send it to a vote of the people.So this is just a
[1:22:59]
summary of all the changes that were made. It is just a high level change.
[1:23:03]
Most changes just reorganize the codes for ease of use and reference formatting and
[1:23:11]
consistency and terms. We added the adopting of title one and 31 statues that are
[1:23:19]
already in our code. There are no changes to candidate petitions up for net
[1:23:23]
financial reporting. We had a policy committee and expenditures definition and we
[1:23:29]
added definitions and partial terms of town Council. We added standardized petition
[1:23:34]
processes and we changed a couple of deadlines for arriving candidates and when we
[1:23:39]
canceled elections to coincide with ballot certification timelines.
[1:23:44]
Those are all of the changes in a nutshell but the entire code is basically removed and
[1:23:50]
replaced with this new code. So the town clerk and town attorney recommend town Council
[1:23:54]
to adopt the revised chapter t .01. Are there any questions?
[1:24:01]
>> Any questions for Lisa and our staff? Okay then.
[1:24:07]
This is the proposed motion. >> Thank you very much.
[1:24:19]
I have no intent to speak if someone wishes to speak please switch the podium to
[1:24:24]
microphone. Please state your name whether you are a resident, nonresident
[1:24:28]
or business owner . Seeing none. We are back to town Council for
[1:24:32]
a approximate motion to discussion.
[1:24:36]
>> Moved to adopt the proposed. >> First by councilmember Dietz
[1:24:39]
and second by councilmember Davis. For a discussion?
[1:24:42]
That was a lot of words.Good job. Roll call vote please.
[1:24:46]
>> CouncilmemberDavis, Council member Brooks . >>TIM DIETZ: Yes .
[1:24:50]
>> MARK DAVIS: Yes.>> MAX BROOKS: Yes. >> KEVIN BRACKEN: Yes.
[1:24:54]
>> LAURA CAVEY, MAYOR PRO TEM: Yes. >> MAYOR JASON GRAY: Yes X
[1:24:58]
motion passes unanimously. >> This is approving the first
[1:25:01]
amendment to the amended and we stated the agreement between the town of of Castle
[1:25:09]
Rock and Cellco Partnership d/b/a Verizon Wireless for Communication Tower .
[1:25:14]
>> Good evening Mayor and Council. Off the beaten path a little
[1:25:19]
different.We've been approached by one of the companies spaced on one of our
[1:25:29]
water tanks about doing a extended telecommunications lease.
[1:25:36]
They originally wanted it in perpetuity and we ended up at 50 years.
[1:25:40]
This is for tank three kind of located just off of fifth Street up on your driving east.
[1:25:45]
You can see it up on the hill. Up their eyes were going towards Founders Parkway.
[1:25:55]
So the idea is to convert with what they are currently doing. Since 1998 and just paying a
[1:26:01]
monthly fee to a one-time upfront payment of 1.1 to million for this 50 year lease
[1:26:10]
using this prepaid function. The current lease as I said was put in place in 1998 and
[1:26:21]
reviewed on a five year basis. The last renewal was in 2020 to and we will have to renew again
[1:26:28]
in 2027. You can see the current lease rate with a little over $2500 a
[1:26:33]
month. The automatic escalate at 3% per year obviously we have
[1:26:37]
ongoing renewals and administrative oversight to make sure we are collecting the
[1:26:44]
money and make sure that we are updating the leaseand working with them as we go forward .
[1:26:50]
This amendment would really just put a 50 year lease in place.
[1:26:54]
They would prepay it on the front and and continue their telecommunication operations as
[1:27:05]
is under the basic same structure we have today. Obviously I know wireless and
[1:27:12]
cell technology will involve over the years evolve over the years.
[1:27:21]
There is all kinds of potential for other technology the way we kind of look at this is it does
[1:27:30]
kind of decrease the risk of maybe not obtaining those lease payments over the long term.
[1:27:39]
Obviously I'm sure the company doing this will make a lot of money or they probably wouldn't
[1:27:46]
be doing this but if they prepay us now we secure that full economic value over the 50
[1:27:53]
year timeframe. It is a little less than what we would get if we clicked
[1:27:58]
these payments over 50 years but it is 1.1 to 5 million up front instead of 1.6 million
[1:28:07]
over a 50 year time periods obviously they take on all of the risk so if cell phones go
[1:28:16]
away and they no longer need cell phone towers that is there risk.
[1:28:20]
Their issue. It provides us with a little bit of financial certainty and
[1:28:31]
reduces the administrative oversight that we have to view going forward.
[1:28:35]
To be clear there are a couple of things important in the lease to do what they are
[1:28:41]
currently doing they are not allowed to disrupt the drinking water system or do things that
[1:28:48]
are going to interfere with their operations but they are allowed to continue the
[1:28:53]
sublease space on the power they currently have in place. If you kind of look at what one
[1:28:58]
point 25 million looks like over a two-year timeframe our current borrowing interest rate
[1:29:09]
is a to .54% it is about 3.9 million. Obviously that could be much
[1:29:13]
higher depending on where we invest that money but I think more importantly it is
[1:29:19]
immediate capital that we can put to work for the water supply and other things right
[1:29:26]
now. Money that we need can be used for debt reduction of course as
[1:29:30]
well and other things but I think it provides some immediate impact and that's
[1:29:41]
what I have for you on this any questions on that? >> LAURA CAVEY, MAYOR PRO TEM:
[1:29:54]
Just noting. I'm going to recuse myself from this boat as I work for
[1:29:58]
Verizon. >> MAYOR JASON GRAY: I have one question.
[1:30:01]
Not that it really matters that much but I'm curious.
[1:30:09]
>> What that says to me is there probably going to make a lot of money off of this.
[1:30:13]
From our perspective we provide some certainty on those lease payments now.As opposed to
[1:30:18]
you know, and again they are taking on all the risk. In my lifetime, in the last 20
[1:30:27]
years right? You look at cell phones and how they changed and all of the
[1:30:38]
other technology. They are taking on that risk. Whether they will even be able
[1:30:43]
to sublease the space or not I don't know. It will take a lot of years to
[1:30:56]
collect that too thousand five dollars a month. >> MAYOR JASON GRAY: If someone
[1:31:01]
wishes to speak please approach the podium please state your name if you are a resident,
[1:31:07]
nonresident or business owner you have four minutes to speak. Seeing none.
[1:31:11]
We will go to town Council for a approximate motion and discussion.
[1:31:16]
>> Moved to approve resolution TMP to 06 Ã27. >> MAYOR JASON GRAY: A first by
[1:31:23]
councilmember Brooks and Ryan Hollingshead. Roll call vote.
[1:31:26]
>> RYAN HOLLINGSHEAD: Yes. >> KEVIN BRACKEN:Yes. >> MARK DAVIS: Yes.
[1:31:33]
>> MAX BROOKS: Aye . >>TIM DIETZ: Yes . >> LAURA CAVEY, MAYOR PRO TEM:
[1:31:37]
>> MAYOR JASON GRAY: Aye. >> Motion passes six Ãzero.
[1:31:42]
>> ÃIs abstaining. >> Think you appreciate that.
[1:31:49]
>> MAYOR JASON GRAY: Number 17 17. RES 2026-068
[1:31:57]
Resolution Approving Funding the Execution of Water Provider Agreement Amendment number 7
[1:32:02]
Between the Town of Castle Rock and the Colorado Water Conservation
[1:32:06]
Board for the Purchase of Additional Storage Space in the Chatfield Storage
[1:32:11]
Reallocation Project Mark? >> MARK DAVIS: Thank you again
[1:32:14]
Mayor and Council. This is a longtime project that we got involved in.
[1:32:18]
This is actually a project that goes back to the late 1980s when they first started talking
[1:32:24]
about reallocating storage space and the reservoir for drinking water storage as you
[1:32:29]
guys probably know the reservoir was put in place for flood control.
[1:32:33]
They will open up about 20,000+ acres for drinking water storage in the facility and we
[1:32:38]
had a agreement in 2014 and modify the agreement again in 2018 to purchase the to
[1:32:43]
thousand acre feet of storage. One of the best agreements we've done in a long time.
[1:32:53]
We've got a 15 year timeframe from the Colorado water conservation Board to buy our
[1:32:58]
2000 feet of storage and five years of deferments. We wouldn't have to pay
[1:33:05]
anything. I know interest. And the only thing we have to
[1:33:08]
do to use the space before we buy it, we have to pay $50,000, or $50 excuse me and acre.
[1:33:17]
For a year. And we get to use the space until we actually purchase it
[1:33:23]
and of course we just pay the operational costs which we would do anyways if we already
[1:33:28]
owned it. So it's eventually been a 15 year no interest loan currently
[1:33:34]
you can see where we are so invested about 6.89 million we have about 1150 to left to buy.
[1:33:43]
We use all five deferments which means for the next nine years this will be in the
[1:33:51]
budget for us to make our purchase. The price per allotment of 129
[1:33:56]
acres is a little over $1.07 million so you can see the remaining cost.
[1:34:08]
You can see the lease rate. Why storage lots of great regions of course.
[1:34:15]
You can capture pre-river flows. We have water rights, junior
[1:34:21]
water rights, senior water rights we flow right in the Chatfield we have additional
[1:34:26]
senior water that flow in their obviously all of our reusable water supplies that we don't
[1:34:36]
recollect automatically go down to Chatfield for us to use. We have lots of opportunities I
[1:34:44]
think one of the exciting things there is two leases on the consent agenda tonight.
[1:34:49]
A number of leases on May 19 we are going to have a record year probably in terms of lease
[1:35:00]
revenue which is super exciting because we can't use that water yet.
[1:35:05]
So if we can reset and make some revenue that will offset our cost for renewable water
[1:35:11]
allows us again to partner with other entities up and down the front range.
[1:35:15]
We have agreements that you guys made remember we sent water up in Weld County and now
[1:35:21]
your cultural and for example related to our storage and in Chatfield reservoir there is
[1:35:27]
lots of other reservoirs like that. One of the biggest long-term
[1:35:33]
opportunities, the storage is a water going into Chatfield reservoir is extremely
[1:35:38]
high-quality and by that I mean it is very low and total dissolved solids or salt.
[1:35:42]
Salt is building up across the front range especially with the front creek because we use it
[1:35:53]
on roads, we drink water and put that back in the screen. We put salt into the creek and
[1:36:04]
it will help blend that down and just so you know salt is very hard to treat.You have
[1:36:09]
to use reverse osmosis which is very expensive. And then of course all
[1:36:13]
flexibility we have a agreement with Denver water for example which allows us which allows us
[1:36:19]
to basically give them water and a reservoir that they have basically solved or treated
[1:36:25]
with Parker water. So a lot of this water can be a very interesting fact.
[1:36:33]
This is a dollar amount that's budgeted and I just wanted to briefly update you on the
[1:36:43]
Chatfield pump back project. You guys know eventually we want to be able to pump the
[1:36:50]
water directly out of Chatfield reservoir back to our reservoirs in Sedalia.
[1:36:55]
We are about 20% of the design we've got to almost have our pipeline alignment nailed down
[1:37:04]
it will be a pump station in the reservoir currently it looks like it will be on the
[1:37:09]
southeast side there is kind of a campground over there that you guys might be aware of
[1:37:14]
there will also be a intermediate booster pump station that will need to be
[1:37:18]
built as well. We are making progress working with the Corps of Engineers.
[1:37:26]
The only downside of this project is the current estimates depending on what
[1:37:31]
final size we decide to put in place as we work from $85-$170 million.
[1:37:37]
It is a big project. We currently have that scheduled down from the 2030s,
[1:37:43]
hopefully the early 2030s. But it's going to take a lot to make that happen.
[1:37:50]
Of course the recommended approvals.
[1:37:54]
>> Any questions for Mark?>> MAYOR JASON GRAY: Seeing none. If anyone wishes to speak
[1:38:04]
approach the podium state your name whether you are not a resident and if you are a
[1:38:18]
business owner you have four minutes to speak Seeing none.
[1:38:21]
Town Council for a possible motion of discussion.
[1:38:24]
>> I moved to approve the resolution number to 0 to 6 Ã 066 .
[1:38:28]
>> MAYOR JASON GRAY: First by Council member Davis second by councilmember pro tem Laura
[1:38:33]
Cavey. Any discussion? Roll call vote please.
[1:38:36]
>> RYANHOLLINGSHEAD: Yes. >> LAURA CAVEY, MAYOR PRO TEM: Yes>> KEVIN BRACKEN: Yes.
[1:38:41]
>> MARK DAVIS: Yes . >> MAX BROOKS: Yes . >> TIM DIETZ: Yes.
[1:38:45]
>> MAYOR JASON GRAY: Yes thank you. Moving on to number 17 number
[1:38:48]
seven between the water and conservation Board between Chatfield storage reallocation
[1:39:00]
project. >> I think we just did that
[1:39:02]
one. >> MAYOR JASON GRAY: I usually try to mark that off.
[1:39:05]
Number 18 18. RES 2026-069 Resolution Approving a
[1:39:19]
ProfessionalServices Agreement with Dewberry Engineers incorporated
[1:39:24]
for the Young American Infrastructure Improvements Project .
[1:39:28]
>> Thank you Mayor. One of the most important things that we do is replace
[1:39:33]
and rehabilitate infrastructure as it ages. We don't want to be like some
[1:39:38]
communities where they have not maintained their water infrastructure so we need that
[1:39:43]
to invest heavily in this area and I think Castle Rock water will be ramping this type of
[1:39:49]
work up even more in the coming years because this is really important.
[1:39:53]
It got to replace all this infrastructure that reaches the end of a peaceful life that you
[1:39:58]
can see here from the back just north of South Street you've got a high circle appear and
[1:40:06]
eight top circle drive up on the top so this is the young American neighborhood
[1:40:11]
essentially all the stuff was put in in the 1970s so over 50 years old essentially.
[1:40:20]
Time to replace all of the infrastructure we've got a significant number of
[1:40:27]
linebreaks and one of the challenges is when we built this infrastructure and put
[1:40:32]
enough piles and so a lot of people end up being when we have to work in there and fix a
[1:40:37]
leak. The other big issue is the pipes were not sized as you
[1:40:41]
currently size them so they are all four and 6 inch pipe. We need our current desired
[1:40:48]
pipe sizing for fire protection so this won't improve fire protection in this area as
[1:40:53]
well. Which is really important to us we see the total amount of pipe
[1:40:57]
we are talking about doing. So, this is actually the agreement we are bringing
[1:41:07]
tonight I want to make sure you guys understand it is only $94,000 business I want to
[1:41:12]
understand why we are bringing it and want to make sure you understand why we are bringing
[1:41:17]
the total cost of the project. We identified some additional design work that needs to be
[1:41:22]
done on this rehabilitation project before we did it there is a little bit on water but
[1:41:27]
there is also as you guys know these rehab projects we partner with Dan's group and public
[1:41:32]
works we don't want to do a bunch of rehabilitation and then come back several years
[1:41:39]
later and redo the work roads. Why not redo the roads when we are doing this?
[1:41:48]
So we always try to coordinate this as maximum as possible and that's what we've done.
[1:41:55]
We were doing this project a couple ofyears ago essentially and we been waiting so we can
[1:42:00]
get this on the schedule . There is some additional design work that public works needs
[1:42:05]
job done with this associated with the sidewalks and the ADA requirements they are going to
[1:42:10]
need to be able to increase the size of both sidewalks a little bit and go into the
[1:42:15]
right-of-way and that is going to potentially impact some people's landscaping or
[1:42:22]
irrigation systems or other things so we need some additional design work done to
[1:42:26]
make sure that that is all understood and that we are in a good position to fully
[1:42:32]
communicate what's going to happen with the customers. The additional design work or
[1:42:42]
small contract about 94,000 you can see the split between public works and water.
[1:42:47]
With this included the overall design would have been about 600-7000 this is a big rehab
[1:42:52]
project so we are estimating on the order of maybe $9 million and 7+ for public works.
[1:43:00]
Again a very big deal and a heavy lift. The idea is to get this design
[1:43:05]
finished up and build the bid late this year into this project in 2027.
[1:43:13]
Commission did recommend approvals as well. And that is it.
[1:43:24]
>> This is the oldest that we have right now. There are others up-and-coming
[1:43:28]
I'm guessing. >> This is some of the oldest
[1:43:35]
we've got. We are really making good progress as you know we did a
[1:43:39]
good project for example we did a project over on Gordon Drive in that neighborhood and it's
[1:43:48]
often Gilbert and it is the subdivision down there on the east side.
[1:43:55]
And so yeah, we are working through rehab and replacement projects to hit these older
[1:44:06]
pieces of infrastructure for the public safety.
[1:44:11]
>> These can be ongoing for a little while so people understand the process of these
[1:44:15]
things can get less expensive, more expensive as time goes on correct?
[1:44:23]
>> They are going to get more expensive and they are disruptive.
[1:44:28]
They obviously have to tear up the road. The reward is safe and renewed
[1:44:38]
infrastructure. And people run the risk of having outages in their
[1:44:41]
neighborhood or problems. And we try to do the roads at the same time which ultimately
[1:44:50]
ends up being a good things that we are hopefully not disturbing residence multiple
[1:44:56]
times once for roads than once for water.
[1:45:01]
>> Any questions from Mark? >> TIM DIETZ: Only houses in the 70s like you are kind of
[1:45:08]
working on certain areas. >> The philosophy we use really
[1:45:17]
is to try to target the areas that are costing us the most money try to minimize the cost
[1:45:23]
of these assets and we are looking at water leaks, AIDS, type of material, size, that is
[1:45:32]
a important material to improve fire protection in the neighborhood but the bottom
[1:45:40]
line is it is a host of criteria and we have a rehabilitation replacement plan
[1:45:46]
in place that identifies the neighborhoods in the areas that we are going to hit overtime.
[1:45:54]
And you will see this in our annual budget every year where we have projects scheduled in
[1:45:59]
to go in and do this kind of work.
[1:46:01]
>> Most of the work is in the street some of them how to tie into the water meter.
[1:46:08]
>> We do all of the tie ends. We tried going back in. But yes the work is in the
[1:46:16]
street. So we will reconnect their service line coming off in the
[1:46:22]
main for water. And for sewer, we try to do even though the sewer lateral
[1:46:27]
is owned by the customer we will try to replace the sewer laterals as well and give them
[1:46:36]
to the edge of pavement or close to the edge of pavement so they don't have to later
[1:46:42]
replace them the sewer lateral under the pavement. >> MAYOR JASON GRAY: Any
[1:46:54]
further questions from Mark? Seeing none.Anyone who wishes to speak please approach the
[1:47:01]
podium and speak into the microphone please state your name and whether you are a
[1:47:06]
resident, nonresident or business owner you have four minutes to speak.
[1:47:10]
Seeing none. We are back to town Council for emotion and discussion.
[1:47:15]
Mayor pro tem. >> LAURA CAVEY, MAYOR PRO TEM: I know they probably Artie know
[1:47:20]
this but there has obviously been a lot of questions around a lot of the ADA stuff to then
[1:47:29]
look perfectly fine questions about it and phone calls we are already aware at this point
[1:47:42]
will we do a project that we need to communicate really well with the community so that they
[1:47:48]
understand what we are doing I got accused of wasting taxpayer money and all kinds of fun
[1:47:53]
things. So I'm just being overly cautious here after what
[1:47:57]
happened in my neighborhood. >> I think the customer outreach portion of this is
[1:48:07]
really the most important piece of this contract we are bringing tonight.
[1:48:11]
We really need Ãa big part of this design, as I understand is to identify what we actually
[1:48:16]
need to do for these locations where we have to widen those sidewalks so that we can
[1:48:23]
obviously fully communicate with customers what's going to happen so that there is not
[1:48:28]
surprises. >> I was just going to quickly
[1:48:30]
add, in addition to those discussions who've also sought to improve our communication
[1:48:41]
with residents when this work is happening they stepped up the language in the notice is
[1:48:47]
that we hang on doors and mail to property owners. We have a really good
[1:48:53]
articulation about why we may be having to change sidewalks that look like they're in
[1:48:59]
perfectly good shape but based upon our measurements with the America disability act
[1:49:07]
requirements they have to be changed or as Mayor pro tem and I had the discussion we
[1:49:13]
susceptor ourselves to substantial liability and the district court judge telling us
[1:49:19]
we've got to do this townwide or at once. So at a very strong practice
[1:49:24]
when we touched streets with maintenance work and something like this rebuilding the
[1:49:30]
streets we want to put in sidewalks, sidewalks are important safety on and then
[1:49:40]
they have to be done in coordination with the Americans of disabilities act or we are
[1:49:45]
going to have that substantial liability. We try and get the word out.
[1:49:50]
I have the same questions when it happened in my neighborhood because we get out and walk and
[1:49:55]
they are like what's wrong with this? It's almost imperceptible.
[1:50:02]
But if the slope is wrong and individuals having to use a wheelchair isn't able to make
[1:50:07]
mobility we get and all of these discussions. That may be the point, they
[1:50:16]
can't with the you wheelchair use that. I've had those discussions.
[1:50:22]
I've had those discussions with neighbors. You've had them as well.
[1:50:30]
We have to get the word out and educate people about why we're having to do that.
[1:50:35]
And we want to make sure that we are using all of the tax dollars wisely we've got to
[1:50:39]
continue to look at that. >> LAURA CAVEY, MAYOR PRO TEM: This is no criticism whatsoever
[1:50:45]
it's just, I think people really truly didn't understand what we were doing and what the
[1:50:51]
requirements were .I think in this case we learned a little something right?
[1:50:55]
And so this time when we go in to do it in this particular neighborhood or whatever comes
[1:51:01]
next week and may be over communicate a little bit more so we are not being accused of
[1:51:06]
wasting taxpayer money. >> I moved to approve the
[1:51:15]
resolution. >> Second.
[1:51:16]
>> MAYOR JASON GRAY: First from councilmember Kevin Bracken and second from Council member
[1:51:23]
Brooks. And a discussion by councilmember Tim Dietz.
[1:51:26]
>> TIM DIETZ: Just real quick for all ofthose working , consult your insurance
[1:51:32]
professionals and really look at lots assessment coverage and these things from your house as
[1:51:39]
the names come up. It is very expensive and covers anything connects to your house
[1:51:46]
I recommend you ask. In this day and age. >> MAYOR JASON GRAY: There is
[1:51:56]
no such thing as over communication . No matter how much we
[1:52:05]
communicate we are going to get people saying they never heard from water or never heard from
[1:52:10]
public works were never heard from us. And so we just keep saying it.
[1:52:14]
Also,this neighborhood , it's even more important on parts of this neighborhood if we are
[1:52:22]
going to discontinue having a sidewalk on both sides and both parts of the neighborhood and
[1:52:30]
it's going to probably upset a lot of people in the neighborhood so I think
[1:52:38]
communication is key. Thank you.With that, roll call vote.
[1:52:41]
>> RYAN HOLLINGSHEAD: Yes. >> KEVIN BRACKEN: Yes. >> MARK DAVIS: Yes.
[1:52:47]
>> MAX BROOKS: Yes. >> LAURA CAVEY, MAYOR PRO TEM: Yes.
[1:52:51]
>> MAYOR JASON GRAY: Aye. Thank you. I will read number 19 and 20
[1:52:56]
together but we will put them on separately.19. RES 2026-070
[1:53:07]
Resolution Approving a Purchase and Sale Agreement between the Town of Castle Rock and Ice
[1:53:12]
Tong Land and Cattle Co. LLC for the Sedalia Force Main and Lift
[1:53:16]
Station to Plum Creek Water Reclamation Authority 20. ORD
[1:53:21]
2026-020 Ordinance Amending Ordinance number 2026-013 Authorizing the
[1:53:25]
Exercise of the Townb of Powers Eminent Domain to Ace Certain Real Property Interests
[1:53:31]
Necessary for the Highway 85 Wastewater Collection and Treatment System Project and
[1:53:36]
Providing for its Emergency Adoption on First and FinalReading .
[1:53:40]
>> Thank you again Mayor and Council. The first part of this is
[1:53:44]
certainly good news. We are moving forward with the property purchase of the to and
[1:53:49]
and a half acre lot we need to build the lift station. So we had a temporary license
[1:53:56]
in place with the property owner while we finalize the purchase.
[1:54:00]
You can see and read located. This map also shows all of the properties that we are going to
[1:54:11]
need so we may come back but the bottom line is you already know about the project.
[1:54:20]
We've talked a number of times about the requirements you can see 11 permanent temporary.
[1:54:27]
There is potentially two pieces of property for purchase this is one of the first ones there
[1:54:35]
may be more and this is 90 and a half acre site the lift station has already started I'm
[1:54:46]
happy to say about the length. Then this is the breakdown of the cost the cost of the
[1:54:51]
property there is also the cost to the easement and access the easement for the pipe and of
[1:54:55]
course temporary to get all of this build. Then there is three other minor
[1:55:02]
things.Both needed to do in accordance with that and the total at the bottom you guys
[1:55:23]
all know the funding piece of this. We filed 1.3 million budgeted
[1:55:27]
for easement and company acquisition. We see here the construction
[1:55:32]
ongoing. The last water commission meeting as well.
[1:55:36]
It was well received and commissions general supported. And that is that would.I'm
[1:55:43]
going to go ahead and go on to the next what if it's okay. Back to back.
[1:55:52]
I want to explain a little bit with this would you guys have already ÃI want to be sure you
[1:55:59]
guys have already approved essentially approve this ordinance we did consult with
[1:56:12]
outside counsel on debated property acquisition and recommended basically that we
[1:56:17]
re-adopt or abet those ordinances just make sure we were being consistent with how
[1:56:23]
the law works if we need to go forward and make sure that there is no minor little issues
[1:56:37]
that causes problems one of the key issues as we have to make sure the property descriptions
[1:56:42]
are in the ordinance we adopted and they were not the ordinance that we adopted on the fifth
[1:56:48]
and 19th you want to come back and make sure those were in this ordinance as we go
[1:56:53]
forward. So this is just a high level of where we are at we had said
[1:56:58]
Fido offers to be clear all the properties except three so we decide what today is about
[1:57:03]
artifact so that's good three properties that we are working on we set Fido offers with the
[1:57:15]
deadline of Judy to the property owners I do want to report we are running well.
[1:57:21]
We are very close we have the property to keep. That what is very close to
[1:57:25]
being done. Add also black paw is also very close to being done.
[1:57:31]
But the keep is really really close. If we don't reach agreement,
[1:57:42]
that we would come back and put these out items first hearing on June 16 and I want to be
[1:57:47]
clear about something it is not your final decision. Jude succeeds should be your
[1:57:54]
final decision. We have the ability to say no we are not doing that it we are
[1:57:59]
going to proceed. Let's see, this is just the separate good of where we are.
[1:58:05]
I just want to again make it clear that I is not the final bill of this we get to look at
[1:58:13]
this again on 16 June. Hopefully we are not going to have to go back to that.
[1:58:22]
I do want to budget Alexander family properties that property is a fairly small piece of
[1:58:28]
property. A number of easements across the Eddie of her prevented that
[1:58:33]
there is another property we are probably going to buy which we are probably going to try to
[1:58:39]
buy that property we think that's what the property owner wants us to do so hopefully now
[1:58:46]
that we've kind of made that decision had moved in that direction will be able to get
[1:58:51]
doubt as well. And this is the schedule. Our recommendation as we go
[1:59:04]
would do this today we recommend to do something on June 16.
[1:59:08]
>> MAYOR JASON GRAY: Mayor pro tem. >> LAURA CAVEY, MAYOR PRO TEM:
[1:59:12]
The last three we are having any issues with I mean, until we have it side there's always
[1:59:26]
a chance. I feel like our team feels really good about black paw at
[1:59:29]
the keep. Got red light back on the easement documents.The price
[1:59:34]
essentially think has been a great thing. The Alexander Ridge property is
[1:59:49]
a small piece of property I think it may be the one that is a little bit of the question
[1:59:54]
not because I don't believe at this point there is necessarily a dispute on the value of the
[2:00:01]
property is just been hard to get communication and keep things moving.We are going to
[2:00:06]
work really hard on it. We've been calling them almost every day trying to keep this
[2:00:12]
moving forward. And you know I think we are open to working with them on
[2:00:16]
that in purchasing the property. Instead of just management.
[2:00:20]
Significant additional cost I might add. Significantly more expensive.
[2:00:29]
>> Thank you. On the 16th, it would be enough to speak right?
[2:00:41]
>> Yes it was a part of the letter and a part of phone calls we've had we been America
[2:00:45]
aware of that and they're invited obviously to come speak at that hearing and plead their
[2:00:52]
case with counsel and discuss where they are at and any concerns to raise those
[2:00:59]
concerns. >> MAYOR JASON GRAY: Thank you very much.
[2:01:02]
>> MAYOR JASON GRAY: Anyone who wishes to speak please approach the podium and speak into the
[2:01:09]
microphone please state your name and whether you are a resident, nonresident or
[2:01:14]
business owner you have four minutes to speak. seeing none. We are back at town Council.
[2:01:19]
The first motion. >> Moved to approve the resolution by title.
[2:01:25]
>> MAYOR JASON GRAY: First by councilmemberBrooks and the second bycouncilmember Kevin
[2:01:31]
Bracken any furtherdiscussion? Roll call vote please >> RYAN HOLLINGSHEAD: Yes .>>
[2:01:36]
KEVIN BRACKEN: Yes . >> MARK DAVIS: Yes . >> MAX BROOKS: Aye .
[2:01:40]
>> TIM DIETZ: Yes .>> LAURA CAVEY, MAYOR PRO TEM: Yes.>> MAYOR JASON GRAY: Tim Dietz.
[2:01:45]
>> Motion passes unanimously. >> MAYOR JASON GRAY: Thank you. I moved to approve ordinance
[2:01:50]
2026 Ã20. >> Second.
[2:01:52]
>> MAYOR JASON GRAY: A first from councilmember Ryan Hollingshead and a second from
[2:01:56]
Laura Cavey. >> RYAN HOLLINGSHEAD: Yes. >> KEVIN BRACKEN: Yes.
[2:02:01]
>> MARK DAVIS: Yes. >> MAX BROOKS: Yes. >> TIM DIETZ: Yes.
[2:02:05]
>> LAURA CAVEY, MAYOR PRO TEM: Yes. >> MAYOR JASON GRAY: Yes
[2:02:09]
councilmember Dietz? >> TIM DIETZ: The town of Castle Rock is always evolving
[2:02:19]
and renewing. If you see the things we have on our agendas regularly that
[2:02:23]
is a main area that we really want to do right or look into the future.
[2:02:28]
We may see a whole hum but everyone here is working all the time.
[2:02:37]
I think we've always said it before we have the best water in the state.
[2:02:40]
And I don't think anybody can be us for the upkeep of where we are going.
[2:02:45]
Castle Rock water, bravo. >> MAYOR JASON GRAY: Think you councilmember Tim Dietz.
[2:02:52]
The time is now 8:04 PM. I will say motion to adjourn the meeting.
[2:02:56]
First by councilmember Kevin Bracken a second by Laura Cavey.
[2:03:00]
Shannon wins tonight. Well done Shannon. >> RYAN HOLLINGSHEAD: Yes.
[2:03:08]
>> KEVIN BRACKEN: Yes. >> MARK DAVIS: Yes. >> MAX BROOKS: Yes ma'am.
[2:03:13]
>> TIM DIETZ: Yes. >> LAURA CAVEY, MAYOR PRO TEM: Yes.>> MAYOR JASON GRAY: Aye.
[2:03:18]
>> MAYOR JASON GRAY: