Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:13]
So, um, calling to order
[0:18]
ASRB meeting for Monday, May the 4th. U,
[0:22]
feels like it's been ages since the last
[0:24]
one.
[0:28]
It has.
[0:30]
So, we we might be a little rusty
[0:32]
tonight. Um, can I can I have a roll
[0:36]
call, please?
[0:37]
>> Chair Lindsay,
[0:38]
>> present.
[0:39]
>> Vice Chair Comra,
[0:41]
>> member Doug Aio, member Middleman,
[0:43]
>> present,
[0:44]
>> and member Sullivan
[0:52]
» Summer.
[0:53]
Yeah,
[0:58]
» there we go. Okay, just a reminder to
[1:00]
anyone in the public who's attending
[1:02]
tonight in person, if you could remember
[1:04]
to sign in on our sign-in sheet at the
[1:07]
entrance, uh on the way in or on the way
[1:09]
out. Either way is good. Um do we have
[1:13]
any changes to the agenda tonight?
[1:16]
>> There are no changes to the agenda. Um
[1:18]
there is one desk item for the project
[1:21]
at 578 Mountain Home Road and that will
[1:24]
be discussed during that presentation.
[1:26]
Okay.
[1:28]
Um at this point we call for any member
[1:31]
of the public who wishes to make a
[1:33]
comment on any topic not on tonight's
[1:37]
agenda. You're welcome to do so now.
[1:40]
And if you're online, you could uh raise
[1:42]
your hand.
[1:46]
» There's no one online. No one on um I
[1:50]
don't see anyone in the room standing up
[1:52]
rushing to the microphone.
[1:57]
Um so we'll close the public
[1:59]
communications and I don't believe
[2:01]
there's anything on the consent agenda.
[2:03]
>> Uh there is there's just the minutes of
[2:05]
January 12th.
[2:06]
>> Okay. Does any member of the board or
[2:09]
the public wish to pull that topic for
[2:12]
disc further discussion? Otherwise,
[2:13]
we'll just pass everything on the
[2:16]
consent agenda with one motion.
[2:19]
No.
[2:25]
» Okay.
[2:25]
>> Second motion.
[2:27]
>> I second the motion. Great.
[2:29]
>> Thanks,
[2:30]
>> Chair Lindseay.
[2:30]
>> Yes.
[2:31]
>> Vice Chair Comra.
[2:32]
>> Member Delgavio.
[2:33]
>> Yes.
[2:34]
>> Member Middleman.
[2:35]
>> Yes.
[2:35]
>> Member Sullivan.
[2:37]
>> Yes. Great. Thanks. Um so the first
[2:41]
actually first topic on tonight's agenda
[2:42]
I believe is the reelection of the chair
[2:45]
and vice chair roles. Is that correct?
[2:49]
>> That is correct. So um every two years
[2:52]
per the charter um there is a change in
[2:55]
chair and vice chair. So um in terms of
[2:58]
the process and if I mess anything up
[3:00]
Julie will correct me.
[3:01]
>> Um
[3:02]
>> I'll correct you.
[3:02]
>> Thank you. um that uh you'll have a
[3:06]
motion, you'll have it, you'll take
[3:08]
nominations uh I believe for the chair
[3:10]
first um and then uh if there's um only
[3:15]
one nomine you'll vote on those nominees
[3:18]
uh and then the person with the most
[3:19]
votes will become chair and then you'll
[3:21]
do the same for vice chair. You'll take
[3:23]
nominations
[3:25]
um and then uh vote for those
[3:27]
nominations. And just to clarify the
[3:30]
regulation um
[3:33]
this puts a learn a term limit
[3:34]
effectively on the roles uh in an effort
[3:36]
to rotate u committee members through
[3:39]
the positions. Um if can the chair serve
[3:42]
as vice chair at the end of that two
[3:45]
years and can
[3:46]
>> um elevated top your head
[3:51]
» doesn't explicitly state that you cannot
[3:54]
um but because of the two-year
[3:59]
>> I think we'd have to look at the
[4:00]
calendar there's a chance that if you
[4:02]
went back to vice chair and then went
[4:03]
for chair again that you may not be able
[4:06]
to but we need to look at that further I
[4:07]
think
[4:09]
>> it's a loosely defined regulation.
[4:11]
>> It's I my understanding is you can you
[4:14]
can be chair for no more than two years
[4:17]
within a 4-year period
[4:19]
>> and the same goes for vice chair
[4:21]
>> believe. So I have a question. Can can
[4:25]
we make a motion that
[4:28]
the chair stays on for the next year?
[4:31]
>> Um it's something I can look into with
[4:34]
the town attorney. If that's where the
[4:35]
board wants to go and just has a
[4:37]
consensus on that, then I'd want to
[4:39]
check with the town attorney's office
[4:41]
and we probably bring that back at the
[4:43]
next meeting.
[4:44]
>> I would like to do that. I know done a
[4:47]
great job and seems to have an interest.
[4:49]
>> Just a reminder to speak in the mic.
[4:51]
>> Oh, seems to have an interest in
[4:52]
remaining as chair. And if it just means
[4:55]
postponing that for one more time, I'm
[4:58]
okay if we want to look into it.
[5:01]
>> I would look to the rest of the board.
[5:03]
Um that
[5:05]
>> I'd be fine if he wants to stay
[5:16]
» just like for consistency first.
[5:19]
>> Oh, I think he's asking a question
[5:21]
because he wants to stay or he wouldn't
[5:22]
have.
[5:22]
>> Um so so yeah and then just make sure
[5:25]
microphone's on. Um R Sullivan,
[5:28]
>> do we have that option right now
[5:30]
considering the way the code is? I mean,
[5:32]
at this point, I would continuing for an
[5:35]
one more meeting is not a significant
[5:37]
issue. So, I was just we'd be
[5:39]
tableabling the item. I wouldn't be
[5:40]
taking that action. If that's where the
[5:43]
board wants to go, then I would have to
[5:45]
consult with the town manager, town
[5:46]
attorney's office to see if that's a
[5:48]
path that could be taken.
[5:51]
>> See if I can summarize right. The debate
[5:53]
is if we're going to motion to table
[5:56]
the nomination of chair and vice chair
[5:58]
for a meeting in order for one cycle in
[6:01]
order to get a proper answer on if
[6:05]
uh the chair and or vice chair can
[6:08]
extend their terms.
[6:09]
>> That's correct.
[6:10]
>> I I personally am not because I only
[6:11]
have one more year. I'm not going to so
[6:14]
this would just be for the chair not for
[6:16]
the chair and the vice chair. So we
[6:18]
would be getting another person on the
[6:20]
committee in that position.
[6:22]
>> Well, I I do think that we should do
[6:24]
both nominations together,
[6:26]
>> right? Correct. No, that that's what
[6:29]
Yeah, that's what we would do. We would
[6:30]
table both nominations and then and they
[6:33]
would still, you know, those votes would
[6:34]
still have to occur.
[6:38]
» So, you're looking for a motion to
[6:39]
continue?
[6:39]
>> Um, I think the direction is fine. We'll just um continue that to the next
[6:44]
meeting.
[6:46]
>> Second. You need a vote on that?
[6:48]
>> Um, sure. Let's do a vote. So, it's it's
[6:52]
clear that it's a unanimous decision.
[6:54]
>> Chair Lindseay.
[6:56]
>> Uh, sure.
[6:57]
>> Vice Chair Comra.
[6:58]
>> Yes.
[6:59]
>> Member Delgavio.
[7:00]
>> Yes.
[7:01]
>> Member Middleman.
[7:02]
>> Yes.
[7:02]
>> Member Sullivan.
[7:03]
>> Yes.
[7:07]
» Okay. Take that up next meeting. So, uh,
[7:10]
first item on the agenda tonight is, um,
[7:13]
I believe we're, which order are we
[7:15]
doing? doing uh 578 Mountain Rome Road
[7:17]
first. Yes.
[7:18]
>> Yep.
[7:18]
>> Okay, great.
[7:23]
» KGO's giving all the presentations
[7:25]
tonight.
[7:26]
>> That's correct.
[7:37]
» Hello and thank you. I will be
[7:39]
introducing the project at 578 Mountain
[7:41]
Home Road for architectural and site
[7:44]
review board review. For this conceptual
[7:46]
design review project, the applicant is
[7:49]
proposing to demolish three existing
[7:52]
accessory structures and a single family
[7:55]
dwelling and to construct a new single
[7:57]
family dwelling, a new barn with an
[8:00]
interior ADU, a new detached ADU, a new
[8:04]
detached pool house, a conversion of the
[8:07]
remaining portion of the existing single
[8:09]
family dwelling into a detached
[8:11]
structure with a new addition and
[8:14]
associated site improve. improvements.
[8:16]
And so there is one desk item uh for
[8:19]
this project for you all today. Um if
[8:22]
you flip to page two of that desk item,
[8:25]
uh it kind of sheds light into what the
[8:27]
adjacent neighbor is um uh has concerns
[8:31]
about. Uh the adjacent neighbor to the
[8:33]
northeast of the project site noted uh
[8:36]
that they have no issues with the
[8:37]
project itself, but rather concerns of
[8:40]
uh future construction staging and
[8:42]
traffic. uh the neighbor utilizes the
[8:45]
public rightway easement to access their
[8:47]
property uh which I will be talking more
[8:50]
about in the next slide and that they
[8:52]
are requesting that the easement area is
[8:54]
not used for parking and storage during
[8:57]
construction. Uh during the next stage
[9:00]
of design review and during the building
[9:02]
permit stages, uh staff will have an
[9:04]
opportunity to look closer at these uh
[9:06]
preliminary uh construction and or uh
[9:09]
staging and traffic plans and ensure
[9:11]
that the neighbors concern uh in this
[9:13]
desk item are addressed.
[9:20]
So moving on to the property
[9:22]
description,
[9:24]
uh the project site is 12.6 6 acres and
[9:28]
it is in the SCP5 zoning district. Uh
[9:31]
the basic setbacks for properties in the
[9:33]
zoning district is 50 ft minimum from
[9:36]
all sides. Uh this subject site is
[9:38]
accessed through Hooper Lane, a private
[9:41]
uh culde-sac street serving 550 through
[9:44]
598 Mountain Home Road properties. Uh
[9:47]
the ex existing driveway begins at the
[9:49]
end of Hooper Lane and extends southwest
[9:52]
towards the uh single family dwelling.
[9:55]
Uh, as I mentioned before, a near narrow
[9:58]
strip of land on the northeastern uh
[10:00]
portion of the site is a ride-of-way
[10:02]
easement for the driveway of that
[10:04]
neighboring property. Uh, that driveway
[10:07]
uh begins from Blue Ridge Lane and is
[10:10]
nonaccessible to that uh to this project
[10:13]
site. Um, and so the topography of the
[10:16]
site uh slopes gently from the east uh
[10:19]
down to the central portion of the
[10:21]
property. Uh the slope then declines
[10:23]
significantly uh towards the western uh
[10:26]
rear portion of the project site. The
[10:29]
rear portion is uh heavily wooded and
[10:31]
undeveloped. Uh the property includes a
[10:34]
uh one 100 ft wide conservation easement
[10:38]
on this western portion of the project
[10:40]
site as well as a 15t wide equestrian
[10:43]
easement along the western portion of
[10:45]
the project site as well as a 15t wide
[10:48]
uh sorry a 10-ft wide easement for
[10:51]
electric utilities uh through through
[10:53]
that center portion of the site. And so
[10:56]
there are uh existing solar panels
[10:58]
adjacent to that equestrian easement
[11:00]
along the western edge. Um at this time
[11:03]
there's no details uh about those uh
[11:05]
existing solar panels.
[11:10]
And so these are some of the existing
[11:12]
pictures of the existing structures that
[11:15]
are not supposed to be demolished uh at
[11:18]
this time. Um and so this includes uh
[11:20]
the equipment barn uh at the rear uh
[11:23]
portion of the site uh the utility
[11:25]
bunker as well as those ancillary
[11:27]
structures uh adjacent to the existing
[11:30]
garden area.
[11:35]
And so this plan sheet here shows the
[11:37]
proposed demolition plan. Uh this
[11:39]
includes uh the maintenance garage, uh
[11:42]
the garage and the guest house which are
[11:44]
proposed to be fully demolished. uh as
[11:47]
well as uh the majority of the main
[11:49]
residents uh except for the uh
[11:51]
library/pavilion
[11:53]
uh structure which I will get to in a
[11:54]
little bit. Uh and uh also um some
[11:58]
hardscaping around the main residence.
[12:04]
And this is um additional pictures of
[12:06]
those structures that are supposed to be
[12:08]
removed. Uh and on the left you can see
[12:10]
the existing guest house photos. Uh the
[12:13]
existing maintenance garage photos in
[12:15]
this column. Uh the existing garage
[12:17]
photos in this column. And on the very
[12:19]
right is the existing photos of that
[12:21]
main residence.
[12:27]
And so this is the proposed site plan
[12:29]
which shows the extent of where the main
[12:31]
residence will be located. Uh the
[12:33]
footprint of the main residence will be
[12:34]
shifted slightly uh further uh west.
[12:39]
uh and also shows the locations of that
[12:42]
uh detached ADU pool house and pavilion
[12:46]
structure.
[12:51]
And so these are the elevation plan
[12:53]
sheets starting with the main residence.
[12:55]
Um, as noted in the staff report, uh,
[12:57]
the applicant at this time is, uh,
[13:00]
proposing a structure of the main
[13:02]
residence, um, that has portions that
[13:05]
are greater than 30 ft in height. Uh,
[13:08]
and at this time, uh, staff is
[13:11]
recommending, uh, as noted in the staff
[13:13]
report that the applicant reduce their
[13:15]
height uh, for a variance uh, for
[13:19]
variance not to be required uh, during
[13:22]
the formal design review stage. would
[13:24]
which would have to be reviewed by the
[13:26]
planning commission.
[13:30]
And so these are the other um post
[13:32]
elevation. Uh this is for the south and
[13:35]
north.
[13:39]
And these are the proposed elevations
[13:41]
for that newborn with an interior ADU.
[13:48]
This is the proposed elevations uh for
[13:51]
that new ADU.
[13:55]
and the proposed elevations for the new
[13:57]
pool house.
[14:02]
This is the proposed elevation for the
[14:03]
pavilion and also noted in the staff
[14:06]
report uh a variance would be required
[14:08]
for this uh detached pavilion. Uh this
[14:12]
currently this pavilion is part of that
[14:14]
main residence. But uh once the main
[14:17]
residence um is shifted away from this
[14:21]
pavilion structure, this detached
[14:23]
pavilion would actually have to be
[14:25]
meeting um basic height limitations for
[14:28]
uh accessory structures, not for uh so
[14:31]
in this case uh since this pavilion
[14:34]
structure exceeds that 17 ft uh basic
[14:37]
height allowed for accessory structures,
[14:40]
a variance would be required.
[14:47]
Um at this time it's uh a variance to
[14:50]
height.
[14:52]
Oh uh it's showing uh
[15:01]
» it's 19 ft. It's about 19 feet.
[15:10]
And these are the proposed elevations uh
[15:12]
for that court courtyard. And as noted
[15:14]
in the staff report, uh the majority of
[15:16]
this courtyard is existing. And uh they
[15:19]
are looking to do um uh some minor
[15:22]
improvements uh throughout this exterior
[15:25]
uh walls of this courtyard area and also
[15:28]
restoring this uh coupa.
[15:34]
And uh at this time uh there are no
[15:36]
physical material samples uh and this is
[15:39]
not a requirement for the conceptual
[15:40]
design review stage. Uh however they uh
[15:43]
presented uh digital samples of the
[15:46]
those materials uh including for that
[15:48]
main house poolhouse/barn
[15:51]
and for the ADU which includes wood
[15:54]
siding uh stone veneer for the wall and
[15:57]
uh dark metal roof metal roof. And for
[16:01]
that library pavilion and courtyard, uh
[16:03]
they're proposing uh bricks as exterior
[16:06]
materials and uh copper gutters and uh
[16:10]
steel windows.
[16:13]
And the applicant has also provided
[16:15]
additional renderings.
[16:18]
And that concludes my presentation. Uh
[16:20]
staff is happy to answer any questions.
[16:23]
Uh story pools were installed at the
[16:24]
site at least 10 days before the hearing
[16:26]
date and the applicant is also here in
[16:28]
attendance to answer any questions.
[16:30]
Thank you.
[16:31]
>> Thank you. Um does anyone on the board
[16:34]
have questions of staff?
[16:36]
>> There's one question. Why would it be a
[16:38]
height variances versus a height
[16:40]
exception?
[16:44]
So for
[16:47]
it the exception
[16:51]
to height variance would require uh
[16:54]
specific findings um for that main
[16:57]
residence which at this time they cannot
[17:00]
meet and that includes um the 100 foot
[17:04]
minimum setbacks required uh for the
[17:07]
entirety of that main residence
[17:09]
structure. So at this time they don't
[17:11]
meet that uh requirement. So uh if they
[17:15]
wish to pursue uh a variance to height
[17:19]
uh they can go through the uh standard
[17:21]
variance process uh during the formal
[17:22]
design review stage.
[17:24]
>> Thank you.
[17:31]
» It says
[17:44]
the the main thing with the detached
[17:46]
structures is just what's inside of
[17:48]
them. And so if it has a full bathroom
[17:51]
and a kitchen and then either just an
[17:53]
open room like a studio apartment or a
[17:55]
separate bedroom, that would qualify as
[17:57]
an ADU. Whereas you might have a pool
[18:00]
house that doesn't have a kitchen in it.
[18:02]
And so if it doesn't have those three
[18:04]
components for eating, sleeping, and
[18:05]
bathing, um, then it's not considered an
[18:08]
ADU.
[18:09]
And so they sometimes call it a pool
[18:11]
house. They may call a guest house or
[18:13]
something like that. Just not
[18:14]
technically an ADU.
[18:18]
>> It's
[18:18]
>> so Yeah. So detached structures other
[18:21]
than barns can be up to,500 square feet
[18:24]
regardless of the use as long as the use
[18:26]
is permitted.
[18:30]
I wanted to clarify the exterior uh
[18:32]
surface of the barn, not of the barn of
[18:36]
the ADU and the other buildings. Some of
[18:38]
the renderings and I understand their
[18:39]
renderings look like it's light in
[18:41]
finish and then some some of the others
[18:42]
look like it's all very dark.
[18:44]
>> Do we know?
[18:45]
>> It's a good question. So, we reached out
[18:46]
to the applicant and hopefully they can
[18:48]
answer that question tonight.
[18:59]
answer that.
[19:00]
>> It's a good question. So, uh they are
[19:02]
already over their maximum allowable
[19:04]
paved area. And so, in the code, um if
[19:08]
you are swapping more than 250 square
[19:12]
ft, which they would be doing here,
[19:13]
meaning they're taking some away from
[19:15]
this part of the property and adding
[19:17]
more to that part of the property. There
[19:20]
is a code requirement in which I always
[19:23]
try to struggle to explain this but you
[19:25]
have to you you have to reduce the
[19:28]
amount that you exceed the maximum by
[19:31]
25%.
[19:33]
So whatever you exceed over what you're
[19:35]
allowed you have to reduce that number
[19:37]
by 25%.
[19:39]
Um so if you are over
[19:43]
uh you know by 20,000 square feet you
[19:46]
have to reduce that overage by
[19:50]
>> so so heavy
[19:50]
>> 4,000. Yes, they've show they've shown
[19:52]
some preliminary plans. There are some
[19:54]
uh things we need some clarifications on
[19:56]
for the formal design review stage. Um
[19:58]
but it looks like they can probably
[20:00]
accomplish that.
[20:05]
» Good. Any other questions?
[20:09]
um
[20:11]
height exceptions or variances on
[20:13]
existing structures. Um is there an
[20:16]
amount of structural change that needs
[20:18]
to happen before that's triggered or
[20:20]
>> So th this is the case with this
[20:21]
particular proposal is that you have a
[20:24]
portion of a building that is part of a
[20:26]
main residence. Main residences can be
[20:28]
up to 30 feet tall. And so this portion
[20:31]
of the main residence is around 19 ft
[20:33]
tall. That is conforming. it conforms to
[20:36]
the existing standards for main
[20:37]
residence. Now that they're going to
[20:39]
demolish the main residence and make
[20:41]
this a detached building, it would
[20:43]
create a nonconforming situation because
[20:45]
it was um over the 17 ft tall. So if if
[20:50]
it was just already existing
[20:51]
nonconforming,
[20:53]
no variance would would be required. I
[20:55]
mean, it's already a detached building
[20:56]
that's over the 17 ft tall and that was
[20:59]
built a long time ago and that's okay.
[21:01]
But because it's creating that situation
[21:04]
in which it was a conforming height,
[21:06]
this would now need a variance to allow
[21:08]
it to remain there. And given you have
[21:10]
an existing structure, sometimes that
[21:12]
will be weighed in. Um, we'll look
[21:14]
closer at the demo plan. You know, if
[21:15]
they're demoing most of the building,
[21:17]
does it make sense? Um, but if they're
[21:19]
just demoing a portion of it to do the
[21:20]
little addition for the bathrooms, um,
[21:22]
that's something that could be looked
[21:23]
at.
[21:24]
>> Oh, actually, my question. So, the 19 ft
[21:26]
is the current roof height.
[21:28]
>> That's correct.
[21:30]
It's not historic.
[21:33]
>> We are we have initiated a historical
[21:35]
review through the town's historian. So
[21:38]
that will be part of what we have with
[21:39]
the formal design review. Um I don't
[21:42]
believe so at this time, but we'll get
[21:43]
that report.
[21:47]
» Great. Any other questions?
[21:49]
>> They also have those.
[21:52]
>> That's correct. So they they for the
[21:53]
barn, they've gone through the livestock
[21:55]
committee um for the conceptual review.
[21:58]
they've raised some questions and
[21:59]
they'll come back to answer those
[22:01]
questions at the formal design review
[22:02]
stage.
[22:04]
>> And do all those questions need to be
[22:06]
resolved before formal?
[22:08]
>> Um depending on what level of detail it
[22:11]
is. Um sometimes you get into things
[22:12]
like ventilation and you know that maybe
[22:15]
comes more at the building permit stage.
[22:17]
Um so uh we'll look at their questions
[22:21]
and see how they can be answered and
[22:22]
what things maybe just get conditioned
[22:24]
for the building permit stage. Are there
[22:26]
parts of the municipal code that
[22:28]
specifically talk about ADUs and barns
[22:31]
in the same structure?
[22:32]
>> Yes. Um, so that was actually that's
[22:35]
something that's been in the code for a
[22:36]
while. It was probably like cycle 4 or
[22:39]
something of the housing element back in
[22:41]
like the 2000s area. Um, so that was
[22:43]
done uh yeah well over 20 years ago. So
[22:46]
barns have been allowed in ADUs for some
[22:48]
time now. We've made some adjustments
[22:50]
given state laws and things like that
[22:52]
>> and the most recent adjustment allows
[22:54]
for up to two ADUs in a barn. Correct.
[22:57]
>> Uh yeah, I mean we the there's a change
[23:01]
in which barns can be fully converted to
[23:03]
ADUs. And so that was looking at, you
[23:06]
know, if someone wanted to convert that
[23:08]
barn into two ADUs, they could do that.
[23:10]
Um then if you're just building a new
[23:12]
barn with an attached ADU, there's
[23:15]
regulations for that proposal. And can a
[23:18]
barn support a Jedu? Uh, no. Jadus are
[23:21]
to be within main residences. Right.
[23:24]
Good.
[23:24]
>> And what was the overall lot coverage?
[23:28]
>> Yeah.
[23:57]
Okay, sorry. Um, so we that's something
[23:59]
that we still need that level of detail.
[24:00]
It's not required for conceptual review
[24:03]
maybe confusion with the other
[24:04]
application. Um, but they do they have
[24:07]
to provide that for formal design
[24:08]
review. Um, it's just not required at
[24:10]
this stage.
[24:13]
>> Okay.
[24:15]
Any last questions of staff?
[24:18]
>> One more reminder of what the ADU code
[24:20]
is.
[24:21]
>> So you're allowed two ADUs
[24:25]
attached or detached. You can have a
[24:27]
third if you have a J AU. Correct.
[24:29]
>> Um you can have three ADUs attached or
[24:32]
detached and on a property of this size
[24:34]
>> without a J AU.
[24:35]
and then you could also
[24:37]
have the J AU.
[24:38]
>> Okay. I missed it. Thank you.
[24:44]
I think that's it for question. Thank
[24:47]
you. Here you go. Um, with that we'll
[24:49]
move on to the applicants presentation.
[25:01]
» Press that red handle if you need to
[25:02]
adjust the up and down.
[25:04]
>> No, this is fine. Can you hear me? Hi,
[25:06]
my name is Tom Taylor. Taylor Limbar
[25:09]
Architects. Um, I have with me today my
[25:12]
our project architect, Fanny Lee, and
[25:15]
our landscape architect, Bob Clever.
[25:17]
We're here to help answer any questions.
[25:20]
Um, we have a few things that that we'd
[25:23]
like to show you that that aren't in the
[25:25]
package just to get yourself a little
[25:26]
bit more familiar with the property. And
[25:29]
also, I'd like to also answer a couple
[25:32]
other questions uh that were brought up
[25:34]
along the way. And then I think that uh
[25:37]
after I speak, I'd like to have Bob come
[25:40]
up and say a few words about the uh the
[25:42]
amount of care that went into the to the
[25:45]
siding landscaping of this unbelievably
[25:49]
beautiful and private property, you
[25:51]
know, that we're we're fortunate enough
[25:54]
to be able to work with. But we have a
[25:56]
uh sort of a little drone fly through
[25:59]
here that we'd like to share with you.
[26:02]
And uh why don't we go ahead and get
[26:04]
that started? It's a good way to sort of
[26:05]
just get an overview.
[26:08]
>> Could you give the orientation toward
[26:10]
Mountain Home, please, when you get
[26:11]
there?
[26:12]
>> Okay. So, this is uh our front gate
[26:16]
coming in off of a
[26:19]
Hooper and come in past the ADU on our
[26:21]
left over there. It's nestled into these
[26:23]
existing trees. There's a lot of
[26:25]
beautiful redwood trees and some big
[26:26]
oaks on the property.
[26:29]
This is our paddics, our our uh our barn
[26:33]
and stables. The ADU is on the right
[26:36]
hand side of this building. Sorry, this
[26:38]
is moving pretty fast here. Coming down
[26:41]
uh sloping down this gentle hill toward
[26:43]
the main house. There's a little there's
[26:45]
a small parking area in front of the for
[26:48]
guests in front of the main house. And
[26:50]
then down the hill a little further, we
[26:52]
get into the garage for the for the main
[26:54]
residence.
[26:59]
As we slope down, there is uh we're
[27:02]
proposing a new uh arena for the horses
[27:07]
working with the existing barn on the
[27:09]
property.
[27:14]
And there's an existing pond here that
[27:17]
we hope to maintain and improve.
[27:22]
And then as we go back up toward the
[27:23]
main residence, we have existing
[27:25]
swimming pool that we're going to
[27:26]
maintain, pool house,
[27:30]
main residence.
[27:32]
And then this is existing koi pond
[27:34]
behind the uh the pavilion structure
[27:37]
that we want to keep. This is the
[27:38]
building that was mentioned that is uh
[27:41]
currently 19 ft tall at the ridge that
[27:46]
we are going to restore.
[27:49]
It's a it's a nice looking building. I I
[27:52]
think that it's uh definitely worth
[27:53]
preserving.
[27:56]
And then we are also going to try to
[27:59]
maintain this little this little tower
[28:03]
here, this Koopa and and and reuse this
[28:08]
existing courtyard
[28:10]
uh where that was the front door to the
[28:14]
existing house right in front of you
[28:15]
there. And now what we want to do is
[28:18]
create like a nice little reception area
[28:21]
here that is
[28:24]
somewhat private from the main house. So
[28:26]
there could be some fundraising events
[28:28]
and things like that out in this area
[28:30]
that wouldn't feel like they're really
[28:32]
coming into the main house.
[28:36]
And then as you look out toward this uh
[28:40]
little meadow and and trees out here,
[28:42]
the main house on your left and to the
[28:45]
right, you'll see the end of the barn
[28:48]
where we have the ADU,
[28:58]
the you know the it's an extremely
[29:02]
private property and I think that It's
[29:06]
let's see if you were asking where Mountain Home Road
[29:12]
is in relation
[29:15]
on the far upper portion of of where of this view of the property and and
[29:21]
then if you go to the right that's uh
[29:24]
Blue Oak
[29:26]
Blue Ridge sorry Blue Ridge. Yeah. So
[29:29]
it's sort of like in between. It's sort
[29:31]
of off coming kind of coming off of that
[29:33]
corner.
[29:36]
the B. So I went all the way down and then clearly
[29:43]
there was a lot of
[29:47]
» I don't know. Is there anything back
[29:48]
there where it's
[29:53]
» okay? There's a trail that goes over.
[29:56]
>> Yeah.
[29:59]
You really can't see Woodside Road.
[30:02]
>> Yeah. I was just wondering what Yeah.
[30:07]
are popping.
[30:11]
» Um, you want to pull up the uh other We
[30:15]
have a couple of renderings here that
[30:16]
are part of a we're just doing design
[30:18]
development for the project to kind of
[30:21]
show more information to the owners. Um,
[30:24]
it'd been asked about the color of the
[30:26]
siding as proposed. It's it's the the
[30:35]
it's going to be medium brown in color.
[30:37]
It's was no intention that it be white
[30:39]
or light and it's no intention for it to
[30:41]
be extremely dark. the the the rendering
[30:43]
technique, especially with the model.
[30:45]
Sometimes it sort of plays around with
[30:47]
the colors a little bit, but the
[30:49]
intention is that we're using all
[30:51]
natural colors or using, you know,
[30:53]
natural stone and and medium color of
[30:57]
siding and all the windows are dark. Um,
[31:00]
so this is the view of the front of the
[31:02]
house. Um, the entry is in the in that
[31:05]
gable area covered. And then you can see
[31:08]
off the right there, that's where it
[31:10]
slopes off and and you can get into the
[31:12]
garages. Those two big trees on the
[31:14]
right, those are existing cyprress trees
[31:16]
that were working around.
[31:18]
There was so much care that's been put
[31:19]
into
[31:21]
the relationship of the buildings with
[31:22]
the existing trees. The owner is the
[31:26]
biggest proponent of that. Doesn't want
[31:27]
to lose a single tree basically. And
[31:29]
we've we've actually affected very very
[31:32]
few uh on the property. And we'll our
[31:38]
plan is to enhance the sort of the
[31:40]
forest feel of the property and really
[31:43]
enhance that and bring in some some more
[31:45]
like redwoods and oaks and to be able to
[31:49]
make it feel like it's really nestled
[31:50]
into the to the trees. And we go to the
[31:55]
next one. This is a view looking across
[31:58]
the swimming pool toward the main house.
[32:00]
The pool house on the right. The pool
[32:02]
house is bunkered into the ground so
[32:04]
that from the upper area you you know
[32:07]
essentially it has a green roof and it's
[32:09]
also viewed from the the main level of
[32:11]
the house which is from this view is the
[32:14]
upper level. You'd be able to look
[32:15]
across and see a green roof rather than
[32:18]
seeing like a a regular you know roof
[32:22]
product out there. The the house is one story on the upper side and two
[32:28]
stories on the lower. So it sort of like
[32:30]
follows the hillside.
[32:33]
What you're seeing on this the upper
[32:34]
right there is that's part of what the
[32:37]
existing structure that we're
[32:39]
maintaining. The pavilion is back there
[32:41]
and this sort of foundations for the the
[32:44]
pool which used to be a swimming pool
[32:46]
many many years ago but has these
[32:48]
enormous fish in there now. I don't know
[32:49]
if you guys were out there on the
[32:51]
property but you know they're these things are really big. They've
[32:55]
been there for they've been there for a
[32:56]
long time.
[33:00]
And then this is the barn. Uh you can
[33:02]
see the the paddics on the left uh and
[33:05]
the the main house in the background.
[33:08]
And this doesn't even do justice to the
[33:10]
amount of landscaping that we're
[33:11]
proposing here because if we did, you
[33:13]
wouldn't be able to see the house. And
[33:14]
when you we kind of wanted to see it, so
[33:16]
we took a little bit of artistic license
[33:18]
there and took a couple of those trees
[33:19]
out, but it would actually be very
[33:21]
heavily wooded. There's a big redwood
[33:23]
tree on the right hand side that doesn't
[33:25]
show up in this view, but that's we're
[33:28]
creating a little culde-sac around there
[33:30]
so that if guests come, they can kind of
[33:32]
come around there and drop off and they
[33:34]
can walk from either through the barn to
[33:36]
the to visit the horses or down a path
[33:39]
that takes you into the main house.
[33:46]
I wanted to talk a little bit about the
[33:48]
uh the height limit issue here. So, this
[33:53]
is a pretty good diagram. I think it
[33:56]
shows exactly where we're exceeding the
[33:58]
30-foot limit. It is one tiny little tip
[34:01]
of one little gable of the living room.
[34:04]
And and it's a lo a location that
[34:06]
wouldn't be visible from
[34:10]
anywhere except for basically a bird's
[34:12]
eye view because it actually is that
[34:16]
gable is sort of centered on a big oak
[34:18]
tree that we're maintaining and the
[34:22]
gable itself is more than 100 ft away
[34:24]
from the property line. It's just that still doesn't meet your your normal
[34:29]
uh guidelines for an exception. And but
[34:32]
we think this is the best solution. We
[34:34]
know that there's ways to do this roof
[34:36]
differently, but I think that they're
[34:38]
all I would consider them all uh
[34:41]
compromises to the design. And we're
[34:44]
hoping that for this tiny little bit of
[34:45]
roof that we'd be able to get this
[34:47]
approved. If if that's if a variance is
[34:49]
what it takes, I think we would probably want to go in that
[34:54]
direction because we feel strongly that
[34:55]
this is the right right solution.
[35:01]
I would like to uh let Bob Glever come
[35:04]
up and say a few words about the
[35:06]
landscape design.
[35:08]
Thank you.
[35:15]
Hi, I'm Bob Clever, landscape architect
[35:17]
for the project. Uh, I want to thank the
[35:20]
committee, the planning staff, everybody
[35:23]
that's been involved with the project as
[35:25]
well as the owners wanting to make this
[35:28]
a forever home for themselves and, you
[35:31]
know, use it for the next several
[35:33]
decades. Uh, also besides Tom, uh, and
[35:38]
Taylor Lombardo, myself, uh, and the
[35:40]
owners, uh, DRS, uh, construction has
[35:43]
been integral to the team to keeping us,
[35:47]
uh, informed on what's there and and
[35:49]
doing their the diagnostics for the
[35:52]
project. And, uh, you know, back to the
[35:55]
owners, this is going to be a a project
[35:58]
that they want to use and live in and grow in for decades. though we put a
[36:04]
lot of effort into how the project
[36:07]
changes from the existing conditions. So
[36:10]
I'll I not going to spend a lot of time
[36:11]
on architecture. I'll give a little bit
[36:13]
more background that maybe starts to
[36:14]
fill in on the on the build on the site.
[36:18]
We use the existing driveway alignment
[36:21]
as much as possible. We eliminated a
[36:24]
loop driveway around the original
[36:25]
garages, but we kept the driveway where
[36:29]
it sweeps in from the end of uh Hooper
[36:32]
Lane and then comes in to the property
[36:35]
and then bears north and then we stay on
[36:39]
the north side of the property towards
[36:41]
the the main house. Uh Tom had mentioned
[36:44]
that there's a significant redwood and
[36:47]
yes, we've made that a focal point and
[36:49]
created an access through the center of
[36:51]
the redwood through the center of the
[36:53]
barn. We then took the center of the
[36:55]
barn and the center of the front door of
[36:58]
the house and made another axis. that a
[37:01]
axis is started from a very large old
[37:05]
oak that we hope to uh fortify uh give
[37:10]
it whatever hormones are possible to get
[37:13]
it to sort of reestablish itself. Um but
[37:17]
we're also using a lot of the other site
[37:19]
work. the existing uh pond that's down
[37:22]
there is uh critical to using it for
[37:25]
well not only fire safety but it is
[37:29]
currently being used for irrigation and
[37:31]
we want to continue that concept if we
[37:33]
can. Uh the koi pond was a development
[37:37]
from an original pool that got that
[37:40]
became that morphed into a koi pond. Uh
[37:43]
we inherited the beauty of an incredible
[37:46]
mechanical system that has made that quo
[37:48]
pond successful as you see it. But
[37:51]
there's also the kitchen gardens that
[37:54]
are there and the fruit tree area that
[37:55]
is back with some of the existing uh
[37:58]
green houses and things and sheds that
[38:00]
you had seen. Those are are part of the
[38:03]
beauty of the property that the owner
[38:06]
feels is integral to saving. So we tried
[38:09]
to keep as many things that made sense
[38:12]
that is existing trees structures uh and
[38:17]
the style of the property and then took
[38:20]
it and then made it or if you will our
[38:23]
own we feel very close to the project.
[38:26]
Um but we took the owner's concepts and
[38:28]
said okay how do we make this better?
[38:30]
developed the existing footprint into a
[38:34]
new home that works better for today's
[38:38]
living for the owner and for their
[38:39]
future. And then then turned the
[38:43]
property from a traditional home into a
[38:46]
horse development that has the barn, the
[38:49]
paddic, a riding ring. Uh took advantage
[38:52]
of the abandoned barn that'll probably
[38:54]
be some sort of tac shop. Um, and so we
[38:58]
really tried to work with things that
[38:59]
make sense. I I'll go off and and just
[39:03]
one of our thoughts to next further
[39:05]
develop it
[39:08]
with the concern of the neighbor for the piece of property that
[39:14]
is a bonus for the property and it's access but it's it it's not really
[39:20]
drivable. Uh our intention is to not use
[39:23]
it for access because it goes to Blue
[39:27]
Ridge and doesn't do us much good. Um
[39:29]
our goal would be to get construction
[39:31]
staging to work with existing
[39:34]
conditions. Um whether it's using areas
[39:38]
like the paddic and maybe the the riding
[39:40]
ring for parking and staging and then
[39:44]
build from there and use the existing
[39:46]
driveway. Um, our intent is to do as
[39:49]
much asphalt and keep a lot of the
[39:51]
things that are there. Uh, I know that
[39:52]
there's gravel coming in at some point.
[39:55]
We will work with the fire department to
[39:57]
make sure we make that fires safe and accessible. It's not quite right in
[40:02]
terms of widths and clearances, but
[40:03]
we're going to make that work. Um,
[40:06]
the owner, one of the beauties of the
[40:09]
property is the existing trees. Um the
[40:13]
owner said to us more than once, I don't
[40:15]
want to lose a tree and if I lose a tree
[40:17]
and if a tree has to go, can we
[40:19]
transplant it? We're working with them
[40:20]
on that. uh and if we you know there's a
[40:24]
lot of existing conditions there that we
[40:26]
would like to maintain um pretty much at
[40:29]
the owners request um but uh we see this
[40:32]
is moving forward to a future and the
[40:36]
existing home didn't have a lot of
[40:38]
workable things and I think you saw some
[40:40]
of the
[40:42]
different things that were going on with
[40:44]
style uh over the many years that it got
[40:47]
renovated and and our look is to make it
[40:49]
a fresh start with the main house um
[40:52]
impervious surfaces. Uh Sage was
[40:55]
absolutely right. We're well beyond the
[40:58]
15,000 ft uh uh allowance, but we have
[41:03]
worked with Lean Brace, the civil
[41:05]
engineers, and continue to work with
[41:06]
them on we have a study now that takes
[41:10]
the overage and the 25% you're allowed
[41:15]
you lose by going from the overage and
[41:19]
we are have a solution that works for
[41:21]
the impervious surfaces.
[41:23]
um we will continue to work with that
[41:26]
and and make sure that we are
[41:29]
uh conforming to the you know uh
[41:32]
alterations that occur. Um any of us
[41:35]
would be happy to take any questions.
[41:39]
Thank you for the time.
[41:40]
>> Thanks.
[41:42]
And if you find that magic formula to
[41:44]
fortify that oak, can you share it with
[41:46]
me?
[41:47]
It it
[41:48]
>> we're in a similar situation. it, you
[41:50]
know, it it um there are an incredible
[41:54]
talented arborist and you know, once you
[41:57]
commit to the concept, the
[42:01]
feeding and care and protection and
[42:04]
potentially maybe a little bit over
[42:06]
pruning in order to get the tree to
[42:09]
restart. Uh but the development there,
[42:13]
we're nowhere near it. uh and the
[42:15]
development existing development is uh
[42:18]
was trying to pay homage to it, but it really spoke to us and the owner when
[42:22]
they said, "Wow, look at that tree." And
[42:23]
everybody was like, "Well, could we do
[42:25]
something with it?" Well, turns out to
[42:27]
be an access from the front door of the
[42:29]
house. So,
[42:30]
>> good luck.
[42:31]
>> Thank you.
[42:31]
>> All right. Anyone on the board have
[42:34]
questions of uh the architect or
[42:38]
landscape
[42:39]
>> architect? Just one other than other
[42:42]
than the neighbor across the street that
[42:44]
was worried about department, it looks
[42:47]
like it's not
[42:50]
uh all the trucks. Uh did you outreach
[42:52]
to the other neighbors?
[42:54]
What what sort of outreach?
[42:59]
» That's one of our next steps.
[43:01]
>> Oh, yeah. Yeah. Actually, we uh we
[43:04]
wanted to to get this in to see if we
[43:07]
were on the right track and then we will
[43:10]
do what we would consider sort of a
[43:12]
traditional neighborhood outreach effort
[43:17]
>> and could you speak to the tightness of
[43:19]
the wire on the mesh of the fence?
[43:23]
>> Excuse me.
[43:25]
>> Sorry. Fence wire mesh seems to be
[43:28]
really tight which would hinder some
[43:30]
passage. Is this accurate as to what
[43:33]
your intention is.
[43:34]
>> I think that's a Bob question.
[43:37]
>> I was gonna ask you before you sat down.
[43:38]
Sorry, Bob.
[43:41]
>> Question.
[43:43]
>> So, it from your experience of the site,
[43:47]
there is an existing fence that encloses
[43:49]
a certain area and our intention is to
[43:53]
extend that a little bit further out
[43:54]
with a drive gate that goes a little bit
[43:56]
further out. still more well more than
[44:00]
100 ft from the formal corner of the
[44:03]
driveway entry. So it but our goal is
[44:07]
not only to do I'm going to use this term because I I'm familiar with
[44:11]
it. The critter the critter access is
[44:13]
still being maintained so that there is
[44:15]
a a way of getting access in but uh deer
[44:19]
there's a little bit more deer
[44:20]
protection than exists now and that's
[44:23]
our intention but it's more rural and
[44:25]
open everything that we're proposing. Uh
[44:28]
and so am I getting close to or did you
[44:32]
have a specific really tight and
[44:35]
frequently what we're seeing is wire
[44:37]
that's a horizontal wire that's a lot
[44:39]
more open than a mesh like this. And so
[44:41]
I was curious as to I honestly I can't
[44:44]
tell you that I've seen the entire
[44:45]
perimeter fence to know what's there but
[44:48]
u is this a dramatic change from what is
[44:50]
there?
[44:51]
>> Um no it's a takeoff. So on the north
[44:54]
side of the property there's wood post
[44:57]
and wire mesh
[45:00]
uh very similar to what we were
[45:02]
proposing. Um, and we are holding the
[45:05]
fence up a foot. Uh, so it's a 5-ft mesh
[45:09]
with a sixft fence. So we do get the
[45:12]
access under um for for critters. And um
[45:19]
the only solid fencing, well there's a a
[45:21]
split rail horse style fence for the
[45:23]
ring and for the paddic. And then uh
[45:27]
there is a uh no real solid fences
[45:32]
except for the existing garden and and
[45:34]
courtyards that we're trying to preserve
[45:36]
cuz again that really spoke to the owner
[45:38]
and said, "Wow, you know, how much of
[45:40]
this can we keep and still do the
[45:42]
improvements that we want to do and get
[45:44]
rid of, if you will, the the if you
[45:46]
will, the odder garages and guest house
[45:49]
that don't really feel quite right for
[45:53]
the for our development. So, you know,
[45:55]
it but uh the fencing that you saw
[45:59]
coming in by the driveway was feels a
[46:03]
lot more designed than our concept of no
[46:07]
rails, just posts and mesh, which will
[46:09]
be I think a lot more transparent than
[46:12]
the framed out fencing that is that you
[46:15]
see when you first enter the property.
[46:21]
» Any other questions for members of the
[46:23]
board?
[46:28]
Um um actually question for the
[46:31]
architect. So I'm I'm curious if you
[46:33]
could speak to um the approach because
[46:37]
you're preserving existing structures
[46:40]
which are largely brick. How that sort
[46:42]
of influenced your thinking in terms of
[46:44]
the material pallet for the new
[46:46]
structures. Um it's always a challenge
[46:49]
trying to integrate old and new. So just
[46:51]
curious what your sort of high level
[46:53]
thinking was around that approach or
[46:55]
your approach you settled on.
[46:57]
>> Yeah, I I agree. I I think that uh I
[47:02]
mean first of all you if you if you've
[47:04]
been to the site, you can kind of see
[47:06]
how many generations of construction
[47:08]
have gone on there. Just even the
[47:10]
pavilion itself, there's at least four
[47:12]
different vintages of brick in that area
[47:15]
there if you look at the walls.
[47:17]
So
[47:19]
we
[47:20]
our idea is to and that's why we're we're finishing the perimeter
[47:25]
around there is to treat the pavilion
[47:28]
and the area in the brick and the koi
[47:30]
pond a little of its it's sort of its
[47:33]
own thing to an extent. It's like a
[47:36]
little jewel box there that a little
[47:38]
piece of history that we think is really
[47:39]
pretty and we think that it works
[47:41]
functionally well w with how the owners
[47:44]
would like to use the house. And then
[47:46]
the rest of the project, uh, we're we
[47:48]
just sort of felt like we wanted to let
[47:51]
it be a little bit more rural, you know,
[47:53]
and still just using soft materials and,
[47:56]
you know, like a lot of natural
[47:58]
materials. And we feel it can work
[48:00]
together. I know that there's there's a
[48:03]
difference there. We've got a slate roof
[48:05]
on one building, we have a metal roof on
[48:07]
the other, you know, but we think that
[48:09]
we can we can find a way to blend these
[48:11]
together. Then also with the use of the
[48:13]
landscape, you know, we we plan on, you
[48:17]
know, having like a like a nice uh
[48:20]
growing, you know, sort of climbing
[48:22]
material that that's that's on the the
[48:25]
brick structure that sort of like just
[48:27]
turns it into to the site in our minds.
[48:33]
Yeah, I particularly like the way
[48:34]
between the main house and ADU and barn
[48:38]
how you change the ratio between stone
[48:40]
and wood siding to signal different
[48:44]
utilities. So was nice touch. Um okay,
[48:49]
any other anyone else question?
[48:54]
» Okay. Um so thank you. Um, with that we
[48:57]
turn to board uh deliberation for public
[49:01]
>> Oh, public comment. Yes, of course.
[49:02]
Sorry, Rusty is right.
[49:06]
>> We do have one member online now. So,
[49:08]
for that person online, if you'd like to
[49:10]
make a comment, please use the raise
[49:12]
hand feature.
[49:17]
» I do not see a raised hand.
[49:22]
» Okay. And anyone in the room make a
[49:25]
comment? Yep.
[49:28]
>> Hi, I'm uh Peter Rose. I live on 8 Blue
[49:32]
Ridge Lane right adjacent to this
[49:34]
project and so um um it's nice to see
[49:39]
the presentation and um I'm glad you
[49:43]
asked about neighborhood, you know,
[49:45]
outreach to the because I I have not
[49:48]
been I didn't know about it until I got
[49:50]
the notice from the town. And so, um,
[49:55]
uh,
[49:56]
I've lived on our place for like 30
[49:58]
years. And so, it's interesting to see
[49:59]
this whole development coming along. Um,
[50:03]
it looks like a nice project. I'm glad
[50:06]
to see the driveway, part of the
[50:07]
driveway that's closest to my driveway
[50:10]
is being removed. And, um, I guess I
[50:14]
just I would have some concerns and, you
[50:16]
know, hope for landscape. I know they
[50:18]
mentioned landscaping to sort of because
[50:20]
there's some, you know, views from my
[50:22]
house directly into the into like the
[50:24]
barn and the ADU. So, I I would hope
[50:28]
that that could be addressed as well.
[50:30]
Um,
[50:32]
so anyway, I look forward to working
[50:35]
with the owners and meeting them too. I
[50:38]
haven't even met him. So, thank you.
[50:40]
Good.
[50:40]
>> Thank you.
[50:44]
Okay. Anyone? Anyone else from the
[50:46]
public?
[50:48]
>> No hands online?
[50:50]
>> No.
[50:51]
>> Good. With that, we'll close public
[50:53]
comment. Move to uh board liberation.
[50:57]
Like to pick a thought.
[50:59]
>> I actually had some more questions for
[51:00]
staff.
[51:00]
>> Oh, no.
[51:02]
>> Member Middleman is taking us backwards
[51:04]
on the agenda. So, uh
[51:06]
>> go ahead. So the one section of the main
[51:09]
house that is over 30 ft, why does that
[51:12]
section, if I recall correctly, there's
[51:13]
an elevator in there? Why does that not
[51:16]
fall under the section of code as a
[51:19]
carve out for towers? And
[51:21]
>> there's two things we want to look at.
[51:23]
There's that little piece of the gable
[51:24]
that they were mentioning that's that
[51:26]
they were pointing out. There's that
[51:28]
taller piece of the building um and I
[51:30]
think that's where you're mentioning the
[51:31]
elevator is. Yeah,
[51:33]
>> that they're showing that from the side
[51:36]
elevation to be conforming. Um, it's
[51:38]
possible the way the grade is that that
[51:40]
could be conforming. We'll need to work
[51:41]
with them and look at that a little bit
[51:43]
closer with the formal designer view.
[51:45]
But the other piece that they're
[51:46]
mentioning is just that gable end that's
[51:48]
the furthest out kind of towards the
[51:50]
pool and the
[51:51]
>> which is kind of nonfunctional. It just
[51:53]
has that,
[51:53]
>> right? It's just part of the extra
[51:55]
height there. Yeah.
[51:56]
>> And then um looking at the pool house,
[51:58]
it has both, you know, a cooking area
[52:01]
and a bathroom. Why does it not count as
[52:04]
an ADO?
[52:04]
>> Um I have to double check. Is it out? Is
[52:07]
it exterior access maybe to the
[52:09]
bathroom?
[52:09]
>> It was an exterior access. Um so it's
[52:12]
not a direct connection interior wise,
[52:14]
but a person at the pool house would
[52:17]
have to walk out of the structure to
[52:19]
access the bathroom. But so the only
[52:22]
change there would be an interior door
[52:25]
to the bathroom and then it would count
[52:26]
as an ADU. The outdoor kitchen would
[52:28]
still count.
[52:29]
>> No. So okay, if it's also an outdoor
[52:31]
kitchen, that doesn't count as a
[52:33]
kitchen. Um, so we look at those things.
[52:35]
Sometimes people are careful. They're
[52:36]
looking at septic and they're trying to
[52:39]
ensure something doesn't qualify as a
[52:40]
bedroom. Um, but if it can be an ADU,
[52:43]
we'll be happy to work with the
[52:44]
applicant to see if they can convert
[52:46]
that into
[52:47]
>> My reputation precedes me. Um, the old
[52:50]
barn,
[52:51]
does it does it now count as an
[52:53]
accessory structure? In my head, and
[52:55]
then this might be just me, I thought we
[52:57]
only allowed one barn per property.
[52:58]
>> Uh, no, it's just an accessory
[53:00]
structure. And no, there's no limits on
[53:02]
barns.
[53:03]
>> Okay.
[53:03]
>> Um, I mean, you know, we've seen a lot
[53:05]
of different things. Uh, sometimes
[53:06]
people just have, you know, I've seen
[53:08]
people do multiple small shelters
[53:12]
um for different animals and some for
[53:14]
horses. So there's no limitation on the
[53:16]
number just other than their total floor
[53:18]
area that's allowed.
[53:19]
>> Got it. And then my last question um
[53:21]
correct me if I'm wrong that permeable driveways and pavers can help
[53:25]
with that aimed area surface coverage.
[53:28]
>> Not necessarily. Um so only when people
[53:31]
have um like uh uh there's like the
[53:36]
grass or there's sometimes this like
[53:38]
plastic grid that people will have plant
[53:41]
things through that's still drivable. Um
[53:43]
when you have those void spaces, we have
[53:45]
allowed people to count the void spaces,
[53:48]
but there is a thing like permeable
[53:50]
concrete which is still solid concrete
[53:52]
almost looks like popcorn but so it lets
[53:54]
some water go through it but those would
[53:56]
just be counted as 100%. So it just
[53:58]
depends what the the if they actually
[54:00]
have openings
[54:02]
um they could decrease they could not
[54:06]
count the voided spaces.
[54:08]
>> Got it.
[54:09]
>> Okay.
[54:11]
Thank you for handing my question.
[54:13]
>> With that, we will move to board
[54:15]
deliberation. So um and I think what
[54:18]
would be helpful if you articulate um
[54:22]
your position on this project and what
[54:26]
you want to commend the applicant for or
[54:28]
what you any concerns you may still
[54:30]
have. So we're going to start with you
[54:33]
Mr. Member Middleman. Is it because I
[54:36]
spoke first? You're being penalized for
[54:38]
late questions.
[54:40]
I think it's a beautiful project. I
[54:42]
think the way they intend to update the
[54:46]
property is
[54:48]
elegant. Um I I definitely enjoy the
[54:51]
fact that they're keeping the courtyard
[54:52]
and library in place and the history of
[54:54]
the courtyard that was shared with me
[54:55]
when I visited the property. I deeply
[54:57]
appreciate.
[55:00]
I think the flow is logical. I it's
[55:04]
all works. Um,
[55:07]
I think it would be hard for me to find
[55:09]
an exception on permeable,
[55:12]
you know, on the on the paved areas
[55:15]
considering that it we are trying to
[55:17]
maintain rural character and we already
[55:19]
have plenty of properties that have, you
[55:23]
know, gravel driveways and there's
[55:24]
plenty of space for compromise there.
[55:28]
With regards to the height variances,
[55:31]
I think it's an interesting conundrum
[55:33]
with the library
[55:35]
because it's existing
[55:38]
and I I could actually probably support
[55:40]
a variance for the library because of
[55:42]
the burden of having to reduce the pitch
[55:45]
of an existing roof that's perfectly
[55:46]
fine by two feet.
[55:49]
gable
[55:51]
aesthetics on the main house is much
[55:54]
harder for me to think about because it
[55:57]
does it doesn't seem to be a burden
[56:00]
outside of that aesthetic of the gable.
[56:04]
So, one of my comments for the applicant
[56:07]
would be to go back and try and find a
[56:08]
way to remove the variance for the house
[56:10]
but keep the variance for the library.
[56:17]
Member Sullivan. Uh
[56:19]
>> yeah, it's a beautiful project that I
[56:21]
think provides an excellent upgrade to
[56:23]
the historic use of the property that uh
[56:26]
will be very attractive and I didn't
[56:28]
have any particular comments beyond what
[56:29]
you've already heard today.
[56:33]
>> Yep.
[56:35]
>> And Del Gabio,
[56:37]
>> thank you. It's a beautiful project.
[56:38]
Really well done. It's wonder Thank you.
[56:41]
Wonderful to hear how much the gardens
[56:43]
and uh trees etc that you're trying to
[56:45]
keep intact. I would be willing to
[56:48]
support the variance on both app both
[56:50]
buildings due to the fact that it's so
[56:52]
far away from and as long as Mr. Rosen
[56:55]
Grants doesn't feel that it's affecting
[56:57]
uh his property, his view and his site.
[57:00]
Uh I would be willing to support that.
[57:03]
And I'm uh also love the idea of the
[57:06]
gardens that are more formal traditional
[57:09]
gardens that are there. And I'm unclear
[57:11]
as to whether that's going to remain and
[57:13]
I wish it would.
[57:16]
And that's it for me.
[57:17]
>> Thank you.
[57:21]
» No, it must be an architect's dream. It
[57:24]
must be an architect's dream to have
[57:26]
this large of a property. And I think
[57:28]
you've done a wonderful job in just
[57:31]
creating all the spaces and the
[57:34]
materials. And I I like the, you know,
[57:36]
the cedar wood but with the stone below.
[57:39]
And and I think Those are are really
[57:41]
nice nice features and it's obviously
[57:44]
you guys have taken a lot of thought
[57:46]
into how to develop this. Um, a couple
[57:50]
of things I I would like although it's
[57:53]
not required for this meeting the last
[57:56]
but I do think um the screening
[57:59]
particularly
[58:01]
those side it would be nice to see some
[58:03]
plans on what might be
[58:06]
to help with that. And I also agree with
[58:10]
uh David that I'd like to see maybe a
[58:14]
little less asphalt and some gravel on the property just for that rural
[58:19]
character. Um but and I I too as long as
[58:24]
once you do the neighborhood outreach
[58:26]
and I would suggest that you you do that
[58:28]
fairly quickly. Um as long as no one has
[58:32]
any you know objections to the height. I have um Other
[58:42]
than that,
[58:46]
it's a beautiful idea. I didn't even
[58:47]
know that property exist.
[58:54]
» How about you, Don?
[58:56]
>> Um, yeah. No, I think everything uh I've
[58:58]
heard already spoken I I am supportive
[59:00]
of. I think it's an particularly elegant
[59:04]
execution of uh trying to preserve and
[59:08]
celebrate existing structures at the
[59:10]
same time developing an entirely new set
[59:13]
of structures with a new pallet. I think
[59:14]
it's nicely done. Um
[59:17]
I think also acknowledging uh trying to
[59:20]
preserve so many existing uh aspects of
[59:24]
the property, the existing pool, um the
[59:27]
courtyard, the library, all of that is
[59:29]
to be commended. Um the goal to minimize
[59:33]
the impact on removal of trees or moving
[59:36]
of trees um is also to be commended. Um
[59:40]
but generally, yeah, I'm very supportive
[59:42]
of the project. Um, I know we don't our
[59:45]
it's not our charter to deal with
[59:47]
exceptions and variances other than than
[59:48]
provide a opinion on it, but um I echo
[59:52]
member Middleman's comments regarding
[59:55]
um the heightened variances on the
[59:58]
library and the new structure.
[1:00:01]
Um although I feel less passionate about
[1:00:04]
impacting the new structure or the tiny
[1:00:07]
little portion of it that is causing
[1:00:09]
that variance.
[1:00:12]
Um, yeah. No, I think it's great.
[1:00:16]
Okay. Um, so,
[1:00:22]
uh, we'll note that the applicant was
[1:00:24]
commended, um, for providing an update
[1:00:27]
to the property with some deferred
[1:00:29]
maintenance. Uh, the for keeping the
[1:00:32]
library in the brick courtyard kind of
[1:00:34]
as a homage to the old at the structures
[1:00:37]
of the property. Um applicant was also
[1:00:41]
commended for the retention of trees and
[1:00:43]
transplanting of trees um and the amount
[1:00:46]
of landscaping being provided uh as well
[1:00:49]
as um what has been said the
[1:00:52]
preservation of different features on
[1:00:53]
the property for such as the library
[1:00:55]
pool and other usable structures. Uh so
[1:00:59]
we heard a couple of comments for
[1:01:00]
recommendations.
[1:01:02]
Um, one is to uh ensure that there is
[1:01:06]
adequate screen screening between 8 Blue
[1:01:08]
Ridge Lane and the new structures on the
[1:01:11]
property. Uh, as well as to provide
[1:01:15]
neighborhood outreach um and
[1:01:19]
the input from neighbors um and to look
[1:01:23]
at the possibility of reducing some of
[1:01:26]
the asphalt and providing more gravel in
[1:01:28]
place of that asphalt.
[1:01:31]
And the one piece here, we had a comment
[1:01:34]
regarding kind of the redesign of the
[1:01:36]
main house to remove the need for
[1:01:38]
variance from uh member Middleman.
[1:01:41]
Sullivan concurred um and member Lindsay
[1:01:45]
there. I think um and then I'll just add
[1:01:47]
that, you know, this would be
[1:01:49]
recommendations coming from the ASRB.
[1:01:51]
The applicant still needs to be able to
[1:01:53]
make the findings for the variance and
[1:01:55]
that will be something that's up to the
[1:01:56]
planning commission. Uh I think we would
[1:02:00]
at the staff level still encourage the
[1:02:02]
applicant to try to avoid the need for
[1:02:04]
variance. It's just a general thing
[1:02:05]
that's good to avoid um with regard to
[1:02:08]
the main house in particular uh when
[1:02:10]
you're starting with a brand new
[1:02:11]
structure. Uh it's something that you
[1:02:14]
know trying to find the hardship and why
[1:02:17]
uh those findings can be made could be
[1:02:18]
difficult. So I think what u I would do
[1:02:21]
if it's okay with the board is just kind
[1:02:23]
of express there was a little bit of a a
[1:02:25]
mixed opinion on that. um and from a
[1:02:27]
design perspective um but that the
[1:02:30]
applicant should still you know will
[1:02:32]
need to pursue and get approval of the
[1:02:34]
variance uh if they do want to move
[1:02:35]
forward with that.
[1:02:36]
>> Yeah. I mean
[1:02:38]
>> exactly considering that the conceptual
[1:02:40]
view is here to prevent surprises at
[1:02:42]
formal
[1:02:43]
>> correct you know reading if I were to
[1:02:46]
read directly from the code that the
[1:02:47]
strict application of this chapter would
[1:02:49]
result in practical difficulty or
[1:02:51]
unnecessary physical hardship which is
[1:02:54]
not of the applicant's own making is
[1:02:56]
extremely hard for me to sit here today
[1:03:00]
granted for a cable
[1:03:01]
>> understood that's something that staff
[1:03:02]
looks at as well and that's that's uh so
[1:03:05]
but you know it'll be the applicant's
[1:03:06]
choice and they'll they move forward. So
[1:03:09]
with that, we've received if there's any
[1:03:10]
other comments to add. Um, no. And then
[1:03:13]
so they did install story polls. Um, so
[1:03:16]
the question would be is if this needs
[1:03:18]
to come back to the ASRB. Um, if not,
[1:03:21]
then it would uh it could be forwarded
[1:03:24]
to staff if they redesign everything
[1:03:26]
that didn't need any exceptions, but
[1:03:27]
they probably will at least for the
[1:03:29]
pavilion building. So if it doesn't come
[1:03:31]
back to the ASRB, um, it would still go
[1:03:33]
to the planning commission for final
[1:03:35]
design review. Yep. Yeah. I mean, I
[1:03:37]
haven't heard any comments that would
[1:03:39]
suggest a need for it to come back to
[1:03:40]
ASRB. So, I think we the motion is to
[1:03:43]
move directly to formal with staff
[1:03:46]
um with all the comments and that's your
[1:03:48]
motion expressed. That is my motion.
[1:03:50]
Great.
[1:03:51]
>> Second that motion.
[1:03:56]
» I would like to still possibly I it
[1:03:59]
doesn't have to but come back to us, but
[1:04:02]
I I would like to see a a screening
[1:04:05]
proposal um before just just so I don't
[1:04:09]
know the consent item something just to
[1:04:13]
take a look and make sure that was taken
[1:04:15]
out
[1:04:19]
» how could we accommodate that without a
[1:04:22]
formal ASRB conception
[1:04:24]
>> you know if it's I mean there there was
[1:04:26]
some significant landscape plans in
[1:04:28]
provided with this packet um so I'm not
[1:04:31]
sure how much more they'll show maybe
[1:04:33]
they'll add some more landscaping there
[1:04:35]
uh between the neighbor. Um so if it
[1:04:38]
comes back to the ASRB just for the
[1:04:41]
landscaping that would be an item in
[1:04:43]
which could do it's been done in the
[1:04:45]
past.
[1:04:46]
>> Reluctant to make an applicant jump
[1:04:48]
through a hoop that's not going to move
[1:04:50]
the needle on if the project's approved.
[1:04:56]
» So So no change to the motion on that
[1:05:00]
>> to the motion. All right. Is there a
[1:05:01]
second?
[1:05:04]
>> I believe Delgavio seconded.
[1:05:05]
>> Second.
[1:05:06]
>> Great.
[1:05:06]
>> Okay. Uh, Chair Lindseay.
[1:05:08]
>> Yes.
[1:05:09]
>> Vice Chair Comra.
[1:05:12]
>> Member Delgavio.
[1:05:13]
>> Yes.
[1:05:14]
>> Member Middleman.
[1:05:15]
>> Yes.
[1:05:15]
>> Member Sullivan.
[1:05:16]
>> Yes.
[1:05:19]
>> Thank you.
[1:05:20]
>> Great. So, we'll be in touch in the next
[1:05:22]
day or two with a letter outlining the
[1:05:23]
outcome.
[1:05:43]
Hey.
[1:05:47]
» Um, all right. Moving on to the next
[1:05:49]
agenda item. So, uh, 675 men's aid away.
[1:05:58]
He goes up again.
[1:05:59]
>> Actually, can I can I ask a procedural
[1:06:03]
question?
[1:06:04]
>> Sure.
[1:06:05]
>> The landscape plan is not required in
[1:06:07]
the ASRB submittal.
[1:06:09]
>> Not with the conceptual designer view,
[1:06:11]
>> right?
[1:06:11]
>> It is with form.
[1:06:12]
>> So,
[1:06:15]
all right, never mind.
[1:06:18]
Although we have h we have had cases
[1:06:20]
where we've requested back with a
[1:06:22]
landscape
[1:06:23]
>> with yeah we've had sometimes comments
[1:06:25]
other comments get addressed at the next
[1:06:27]
stage whereas just bringing back the
[1:06:28]
landscape plan that's occurred. Yes.
[1:06:36]
» And this is the third and final item on
[1:06:38]
tonight's agenda. I will be introducing
[1:06:41]
the project at 675 Mansin the Way for
[1:06:44]
ASRB review. For this conceptual design
[1:06:46]
review project, the applicant is
[1:06:49]
proposing to demolish an existing single
[1:06:51]
family dwelling, uh, three existing
[1:06:53]
accessory structures and an existing ADU
[1:06:57]
and to construct a new single family
[1:06:59]
dwelling, a new detached garage, two new
[1:07:02]
uh detached ADUs and associated site
[1:07:05]
improvements. and ask for uh item three.
[1:07:09]
Uh there are no desk items at this time.
[1:07:16]
So to give a bit background on this
[1:07:18]
property, uh the property size is 2.72
[1:07:22]
acres and is in the RR uh rural
[1:07:25]
residential zoning district. Uh the
[1:07:28]
basic setbacks for properties in the
[1:07:29]
zoning district is also 50 ft minimum
[1:07:32]
from all sides. Uh the project site is
[1:07:35]
located at the southeastern portion of
[1:07:37]
Woodside and is located adjacent to
[1:07:40]
Whiskey Hill Road and we are adjacent to
[1:07:42]
Sandh Hill Road. Uh there are two
[1:07:44]
existing driveways uh one located
[1:07:46]
towards the northwestern side and the
[1:07:49]
other located at the southwestern ed
[1:07:51]
sorry the southeastern edge. Uh the
[1:07:54]
topography of the site
[1:07:56]
is relatively flat from Manne Way to the
[1:07:59]
central portion of the property. Uh as
[1:08:01]
you move down uh east uh towards the
[1:08:04]
rear uh the slope declines
[1:08:05]
significantly. Um and Bear Gulch Creek a
[1:08:09]
designated stream and stream corridor in
[1:08:11]
Woodside runs along this eastern portion
[1:08:13]
of the project site. Uh the subject site
[1:08:16]
also includes uh existing vineyards uh
[1:08:18]
along the central portion uh between the
[1:08:21]
existing main residence and that stream
[1:08:23]
corridor. Uh the property includes a 25
[1:08:27]
foot wide uh right-of-way easement and a
[1:08:30]
20 foot wide driveway easement uh is
[1:08:33]
serving as an e ingress egress path for
[1:08:35]
that neighboring property on the north
[1:08:38]
uh currently not used by that adjacent
[1:08:40]
neighbor um on that northern portion of
[1:08:43]
the project site. Um there are also uh a
[1:08:47]
12T wide storm water easement and a 30
[1:08:50]
foot wide uh ride ofway easement on that
[1:08:53]
southern uh edge uh of the site.
[1:08:57]
And
[1:09:00]
there are four accessory structures you
[1:09:02]
can see in this demolition plan uh along
[1:09:05]
the front and rear portions of the
[1:09:07]
project site. So there's that one uh
[1:09:10]
accessory structure near that stream
[1:09:12]
corridor uh along with those three other
[1:09:14]
accessory structures
[1:09:17]
um ranging from 288 ft to approximately
[1:09:20]
2,14
[1:09:22]
square ft structure. Uh that's currently
[1:09:25]
being called as an ADU. Um so these four
[1:09:28]
structures uh along with that main
[1:09:30]
residence uh they're all proposed to be
[1:09:32]
removed.
[1:09:36]
And you can see uh the existing pictures
[1:09:39]
of those uh uh structures at the site
[1:09:42]
along with uh the portion of the
[1:09:44]
vineyard that's also proposed to be
[1:09:46]
removed.
[1:09:51]
This is uh a slide of the proposed site
[1:09:53]
plan. Uh I provided uh two site plans.
[1:09:57]
Uh the right side shows more uh details
[1:10:00]
uh showing the extent of that adjusted
[1:10:03]
uh driveway. And as noted in the staff
[1:10:05]
report, a second driveway exception uh
[1:10:08]
may be uh would be required actually
[1:10:11]
since uh they are uh proposing to adjust
[1:10:15]
uh the second driveway opening uh
[1:10:17]
further uh northwest along that man's
[1:10:21]
need roadway.
[1:10:23]
And as for the uh vineyard as mentioned
[1:10:26]
earlier would be um modified and at this
[1:10:29]
time they are proposing a septic leech
[1:10:32]
fields to be placed in that area of that
[1:10:35]
existing vineyard space.
[1:10:40]
And so here are the proposed elevations
[1:10:42]
uh starting with that main residence. So
[1:10:44]
at the top uh shows the proposed front
[1:10:47]
elevation and the bottom shows the
[1:10:49]
proposed rear elevation for that main
[1:10:51]
residence.
[1:10:54]
And these are additional elevations for
[1:10:56]
that main residence uh with the left
[1:10:58]
showing the left elevation and that
[1:11:00]
right showing the right elevation.
[1:11:05]
These are proposed elevations for that
[1:11:07]
detached garage
[1:11:13]
and the proposed elevations uh for that
[1:11:15]
ADU1
[1:11:19]
and proposed elevations for the second
[1:11:21]
ADU.
[1:11:25]
And so again uh physical materials
[1:11:27]
samples are not required at the CDR
[1:11:30]
stage. However, the applicant has showed
[1:11:33]
uh digital uh samples of the proposed
[1:11:35]
materials and uh for all structures
[1:11:38]
proposed at the site uh they are
[1:11:40]
proposing uh wood sighting uh as well as
[1:11:44]
gray uh stone veneer uh and painted uh
[1:11:49]
dark colored uh slate roofing.
[1:11:55]
The applicant has provided uh additional
[1:11:57]
renderings for this uh project.
[1:12:01]
So that concludes my presentation. Uh
[1:12:03]
staff is happy to answer any questions.
[1:12:05]
Uh story pools were also installed at
[1:12:08]
the site uh at least 10 days prior to
[1:12:09]
the hearing and the applicant is also
[1:12:12]
here in attendance to answer any
[1:12:14]
questions. Thank you.
[1:12:18]
» Does anyone on the board have questions
[1:12:20]
of staff?
[1:12:25]
question about the amount of trees that
[1:12:27]
are to be removed. Could you provide
[1:12:29]
some clarity on that?
[1:12:31]
>> Sure. Yes. So there are 21 trees uh to
[1:12:33]
be removed mainly along that uh western
[1:12:36]
uh front portion. Um at this time we
[1:12:40]
know that six are sign uh considered
[1:12:42]
significant trees. Uh of those six
[1:12:45]
significant trees uh two are cited in
[1:12:47]
were health
[1:12:56]
questions again. The uh black wire mesh
[1:12:59]
on the fence once again it seems pretty
[1:13:01]
tight and it's tight to the ground. Have
[1:13:02]
you made any revisions to that at this
[1:13:04]
point for wildlife habitat passing?
[1:13:08]
Um I believe the applicant can provide a
[1:13:11]
better responses
[1:13:13]
get to that
[1:13:19]
all the structures are all within the
[1:13:21]
height uh limits. There's no exceptions
[1:13:24]
to records as expected. No, the yeah, as
[1:13:27]
from the information we have so far, it
[1:13:28]
doesn't appear that the although this is
[1:13:31]
just a it is a technicality when you are
[1:13:33]
moving you have two driveways and you're
[1:13:34]
moving one of them, it does require the
[1:13:36]
second driveway exception. Um, and as we
[1:13:38]
know in the staff report, typically
[1:13:40]
getting further away from an
[1:13:41]
intersection is a good thing. Um, it
[1:13:44]
does then move it right across from a
[1:13:45]
driveway across the street. Um, so some
[1:13:48]
of those things in terms of safety and
[1:13:49]
sight distance are things that we get at
[1:13:51]
the next stage. Um, and it seems like
[1:13:54]
the right thing to do. They could uh uh
[1:13:56]
pro we could process a second driveway
[1:13:58]
exception.
[1:14:00]
>> You anticipated my second question.
[1:14:03]
>> Have a question. The lead shield have to
[1:14:04]
go beyond
[1:14:08]
>> I think they're No, aren't they they I
[1:14:10]
think they're a little bit beyond the
[1:14:11]
applicants probably best explain it. Um
[1:14:14]
but they they there's some area where
[1:14:16]
they have to remove some of the vineyard
[1:14:17]
to accommodate it and also they have the
[1:14:18]
expansion area
[1:14:22]
in the area where they're removing the portion where they're removing it
[1:14:25]
yet.
[1:14:28]
>> And and looking at the lighting, it
[1:14:29]
appears that it's not dark sky lighting.
[1:14:31]
>> No. So these are it's interesting. Um
[1:14:34]
we'll get the full details, but I
[1:14:35]
believe these are compliant. Um, when
[1:14:37]
you see these glass shields, now that
[1:14:40]
you have the small LED bulbs, those are positioned way in the top of the
[1:14:45]
housing, which is technically shielded
[1:14:47]
where that light source is. So, a lot of
[1:14:49]
these old fixtures, you'd see the light
[1:14:51]
bulb hanging down. And now, what we're
[1:14:54]
seeing is a lot of these light new, more
[1:14:55]
modern features have these tiny little
[1:14:57]
bulbs up in the top. So, the area of the
[1:14:59]
light source is shielded.
[1:15:02]
Whatever.
[1:15:03]
>> I don't think it's really the case with
[1:15:04]
these specific fixtures, but
[1:15:07]
>> yeah. Well, so when we just see we just
[1:15:08]
get these pictures, we get the
[1:15:09]
specifications to the next stage and
[1:15:11]
they will have to make sure that the the
[1:15:13]
bulbs do not hang down where they kind
[1:15:16]
of eye level. You'd see them from the uh
[1:15:18]
through the translucent glass.
[1:15:20]
>> And is the Benjamin Moore paint color
[1:15:22]
that Iron Mountain is that the siding
[1:15:25]
paint color versus I don't know what
[1:15:28]
Vera Stone is.
[1:15:30]
So it looks like the entire majority of
[1:15:32]
the building is that Benjamin Moore iron
[1:15:35]
stone iron mountain which is pretty dark
[1:15:38]
very dark. go back to the um
[1:15:42]
so there and this is something the
[1:15:43]
applicant can clarify cuz you know the renderings on the front had much
[1:15:48]
lighter colored wood and then
[1:15:50]
>> what they're showing here is so I think
[1:15:51]
what we're seeing is that it is this um
[1:15:54]
hickory stain is the actual sign
[1:15:58]
Benjamin Moore I'd have to ask the
[1:16:00]
applicant to clarify
[1:16:01]
>> maybe the
[1:16:01]
>> I think that might be yeah I think
[1:16:03]
that's just some of the the trim
[1:16:04]
painting
[1:16:06]
and
[1:16:06]
>> actually I got that clarification from
[1:16:08]
that applicant. Uh as far as for the um
[1:16:11]
uh exterior elevation uh for that wood
[1:16:14]
uh sighting detail, uh they're going
[1:16:16]
with the uh color shown in this uh
[1:16:18]
materials rendering.
[1:16:22]
» Thank you.
[1:16:28]
» So they won't uh they're not proposing
[1:16:31]
the wood color shown in this rendering
[1:16:33]
from the title sheet. Uh they're showing
[1:16:35]
the um um the wood color shown in this
[1:16:40]
one. So it's it will be darker.
[1:16:46]
» He's itching to answer us. Move.
[1:16:49]
>> Any other questions of staff?
[1:16:54]
>> Does the fence uh conform to what's in
[1:16:57]
the code for fences?
[1:17:06]
Um I can note that they will have to um
[1:17:08]
do you have a specific question?
[1:17:10]
>> They're really tight basically.
[1:17:13]
>> Yeah. I mean we'll ensure I you know I'd
[1:17:14]
have to go back off the top of my head.
[1:17:17]
Um but uh yeah any of the proposed
[1:17:19]
fences
[1:17:19]
>> as far as the fencing um a portion of
[1:17:22]
the existing fencing uh is existing
[1:17:24]
along that rear side and is proposed to
[1:17:26]
uh remain uh while that existing fencing
[1:17:29]
along the side and front uh which is
[1:17:32]
along San Hill Road and along Manzanita
[1:17:34]
Way are proposed to be removed and a new
[1:17:37]
6 foot tall uh wooden wire fencing is
[1:17:40]
proposed around that perimeter of the
[1:17:42]
property uh approximately in that same
[1:17:44]
location.
[1:17:46]
So yeah, we'll ensure that that it's no
[1:17:48]
taller than six feet and it has proper
[1:17:50]
setback.
[1:17:50]
>> I I guess the question that's come up
[1:17:52]
this evening is this tight wire mesh is
[1:17:55]
that
[1:17:57]
>> so that you know in terms of that we're
[1:17:59]
looking at residential design
[1:18:00]
guidelines. There's general plan
[1:18:02]
policies that encourage wildlife
[1:18:04]
passage. Um and so uh definitely there's
[1:18:08]
been cases in which people have been
[1:18:10]
looked at if there's sufficient wildlife
[1:18:12]
passage through the property. Um, and
[1:18:15]
sometimes people have asked to kind of,
[1:18:17]
you know, raise some portions, sometimes
[1:18:19]
lower some portions of fencing to help
[1:18:22]
encourage more wildlife passage. So,
[1:18:24]
it's not a hard municipal code
[1:18:26]
requirement. It's a more of a design
[1:18:28]
guidelines and general plan policies for
[1:18:30]
the encouragement of wildlife passage.
[1:18:37]
Anything else?
[1:18:40]
>> Okay. With that, we'll move on to
[1:18:43]
presentation from the applicant.
[1:18:47]
>> Thank you everybody. Uh my name is Is
[1:18:48]
this on?
[1:18:49]
>> Uh yes, just you can uh press the red
[1:18:51]
handle in front of you under just below
[1:18:53]
the mic and I can raise it up a little
[1:18:55]
bit.
[1:18:57]
>> Okay. My name is Gary Coulat Associates
[1:19:00]
Architecture. Um thank you everybody for
[1:19:04]
uh all your excellent questions. I think
[1:19:07]
uh um it's refreshing to have a board
[1:19:11]
that um is concerned but also um ask
[1:19:15]
careful uh pertinent questions. So I
[1:19:18]
appreciate that talking from someone
[1:19:20]
I've been to many many towns and cities
[1:19:23]
in the Bay Area. So um it's the first
[1:19:26]
time we've been in in Athetherton for
[1:19:27]
many years. Um I mean Woods, sorry.
[1:19:30]
>> Like you're not here.
[1:19:34]
>> Um
[1:19:34]
>> we get confused all the Yeah. Uh I hope
[1:19:37]
everybody was able to make it out to the
[1:19:39]
site and got access onto the property.
[1:19:41]
Um it is quite a beautiful property. Um
[1:19:44]
it uh especially because the trees are mostly uh located on the perimeter.
[1:19:51]
It it's kind of nice that we really
[1:19:53]
didn't have to take down too many trees.
[1:19:55]
I'll speak on that in a moment. Um
[1:19:58]
you've got the creek that circumvents
[1:20:00]
the side and the rear. Um and um
[1:20:05]
but we do have uh San Hill Road right
[1:20:08]
adjacent to us and so that's a a very
[1:20:10]
busy road and a lot of noise and and u
[1:20:14]
and action there. Um we also we're uh
[1:20:17]
have this vineyard that is um it's a dry
[1:20:21]
vineyard at this point. It's not
[1:20:23]
irrigated. So that's wonderful. It's producing. Um we intended to keep
[1:20:29]
as much of this vineyard as possible. We
[1:20:31]
are still working with the uh the septic
[1:20:34]
design. We finally got our perk rates
[1:20:36]
back and we're we're moving along on
[1:20:37]
that. Um our intention is not to uh
[1:20:42]
interlace these uh leash lines with the
[1:20:44]
vineyard if possible. Um we do have an
[1:20:47]
area that's cleared for that already. Um
[1:20:52]
the um the site I want to speak a little
[1:20:56]
bit about the dual access because um we
[1:20:59]
were we were um uh very excited to have
[1:21:03]
dual access in Woodside um on this
[1:21:06]
particular property given the fact that
[1:21:08]
it's it's close to the corner. Um
[1:21:11]
there's not a lot of uh street parking.
[1:21:13]
Uh this the way it functions today is
[1:21:16]
the nice loop loop in loop out. you can
[1:21:19]
get a lot of cars into that um that
[1:21:21]
driveway on site. Um so we wanted to
[1:21:24]
maintain that dual access and we worked
[1:21:26]
really hard trying to keep the the
[1:21:30]
both access points where they are. Uh it
[1:21:33]
just really wasn't functioning very
[1:21:35]
well. Wasn't very architectural as well.
[1:21:38]
And so that's why we're we're proposing
[1:21:41]
to move the the first the on the is it
[1:21:45]
the you're you're calling it the east
[1:21:47]
the south southern one um away from San
[1:21:51]
Hill Road. It's just safer to do that.
[1:21:53]
Our engineers have looked at that and
[1:21:55]
verified that it meets all the
[1:21:57]
engineering standards to do that. Um uh
[1:22:00]
it just it just really helps our site.
[1:22:03]
Um and we really want to maintain it. um
[1:22:07]
if we had to uh we would move the move
[1:22:10]
it back to the existing, but we're just
[1:22:12]
asking to you guys and everybody to uh
[1:22:16]
understand why we've done that. It just
[1:22:18]
lines up better with our motorc court,
[1:22:20]
with our driveways. It doesn't it
[1:22:22]
reduces uh impervious coverage as well.
[1:22:26]
uh and and impervious coverage. I know
[1:22:29]
this came up on the on the previous um
[1:22:32]
item. We are also inheriting a property
[1:22:35]
with quite a bit more coverage than
[1:22:38]
what's allowed. Um and we are uh asking
[1:22:43]
for a little bit more than what's
[1:22:44]
allowed, quite a bit less than than um
[1:22:48]
uh what we could ask for. And certainly
[1:22:51]
meeting that 25% reduction. We're
[1:22:54]
probably about 60 70% reduction. So, I
[1:22:58]
think we're we're we're we're in that
[1:22:59]
good spirit of reducing the impervious
[1:23:02]
coverage. The home itself uh is a
[1:23:05]
two-story home and u we set that back to
[1:23:08]
get get the heights that we desired to
[1:23:11]
get our our our uh 11 foot ceilings in
[1:23:15]
the main floor and and nice ceilings
[1:23:18]
upstairs as well. Um the house is
[1:23:20]
designed in a we're calling it a
[1:23:23]
transitional um you know ranch not ranch
[1:23:27]
but um it's a hard to put labels on
[1:23:31]
houses these days you know but it it has
[1:23:33]
a lot of traditional forms but it's got
[1:23:36]
more modern detailing and so we're it's
[1:23:39]
a falls into this transitional u uh
[1:23:43]
label I suppose. Um the materials are
[1:23:46]
all going to be natural. Uh we got the
[1:23:48]
cedar, we've got real stone. Um and the
[1:23:52]
wood that's uh there was a question
[1:23:53]
about the wood. Uh we've got some
[1:23:56]
panels, we've got some heavy trim, we've
[1:23:58]
got fasciding
[1:24:03]
will get a natural stain on it. Um and
[1:24:07]
um we think that the combination is very
[1:24:10]
uh is very becoming. It's it's it's
[1:24:12]
understated. It's elegant. It fits
[1:24:15]
Woodside. Um, and it it also fits the
[1:24:18]
site very well. And the the the ADUs and
[1:24:23]
garage will also be very complimentary
[1:24:25]
matching materials. The garage or detach
[1:24:29]
garage because it's a detach structure
[1:24:31]
has a height limit. Um, and it so we had
[1:24:35]
to cheat the the roof pitch a little
[1:24:37]
bit. It doesn't match the house quite
[1:24:40]
otherwise we'd have to ask for a
[1:24:41]
variance. And so we've decided to not do
[1:24:44]
that and make the the garage comply with
[1:24:47]
the height limit. Um
[1:24:51]
what else do I want to talk about? Um
[1:24:54]
the it was is staff noted that the um
[1:24:57]
our entrance is is not of human scale or
[1:25:02]
something like that. Um we we're
[1:25:05]
certainly willing to fine-tune this and lower it a little bit. Our thinking
[1:25:10]
was when we were doing our our our
[1:25:12]
massing is we have two uh gables that
[1:25:16]
flank the entry. Those are those main uh feature points. And then um we
[1:25:22]
felt that this we kept raising it to
[1:25:24]
make it feel better fit the other to to
[1:25:27]
fit the scale of the other tube. Um,
[1:25:31]
however, um,
[1:25:33]
we could see that we could bring it down
[1:25:35]
a foot or so and and still still get
[1:25:37]
that feel without it looking um too dim.
[1:25:43]
So, we want to certainly want to call
[1:25:44]
that call that entrance out, but also uh
[1:25:47]
be respectful to the overall
[1:25:49]
architecture,
[1:25:51]
but we're certainly amanable to to work
[1:25:53]
with staff on on on getting that down.
[1:25:56]
And maybe there's a good compromise
[1:25:58]
there.
[1:25:59]
>> This is the bridge that you're speaking.
[1:26:01]
>> I think they're talking about the entry itself with the arch. Yeah.
[1:26:05]
>> Yeah.
[1:26:06]
>> Got it.
[1:26:06]
>> Right.
[1:26:09]
So, um I'm trying to about the fences.
[1:26:14]
We've worked on a landscape architect.
[1:26:15]
Um he's done several projects in town um
[1:26:19]
and he's aware of the uh the uh the
[1:26:24]
guidelines versus the rules. And we just
[1:26:26]
felt at this point um that you've got
[1:26:30]
the creek, you've got a lot of wildlife
[1:26:31]
that that has that creek access. We're
[1:26:33]
certainly not going to block any of
[1:26:35]
that, but with the vineyards to protect
[1:26:38]
the swimming pool, all those things, it
[1:26:40]
we just felt that that the uh the wire
[1:26:43]
fence was was the right thing to do. We
[1:26:47]
certainly um can work again with staff
[1:26:50]
uh with our owners and um see if there's
[1:26:53]
any way we can we can work together on
[1:26:57]
this.
[1:27:02]
But overall, I think it it it pretty
[1:27:04]
much speaks for itself. I do want to say
[1:27:07]
I I I certainly can emphasize with with
[1:27:09]
uh with the other architect our
[1:27:12]
renderings um we use different programs
[1:27:14]
that will render different ways um and
[1:27:17]
also seeing it on the screen at least on
[1:27:20]
the projector screen maybe not on the TV
[1:27:23]
it it also renders different and I've
[1:27:26]
noticed we noticed that uh the end the
[1:27:29]
our cover sheet renders were even
[1:27:32]
brighter tonight whereas the our
[1:27:35]
elevations were even darker. So, I think
[1:27:37]
you're going to find something in the
[1:27:39]
middle. Um, and uh and certainly those uh cover sheet renderings were not
[1:27:45]
meant to be uh like photo realistic, let
[1:27:49]
me put it that way. So,
[1:27:52]
but I think you get the idea. It's going
[1:27:54]
to be medium brown. What is that? So,
[1:28:04]
um, is she any questions? I'd be happy
[1:28:06]
to do my best to answer those.
[1:28:08]
>> Okay. Thank you. Um, does any member of
[1:28:10]
the board have questions? Um,
[1:28:12]
>> I have a a quick question. I don't want
[1:28:14]
to be on my own. So,
[1:28:18]
my house is fit because your kid goes
[1:28:21]
crazy. They're good. Um, but on the
[1:28:24]
sides of the property between your
[1:28:26]
neighbors property, are there wildlife
[1:28:28]
corridors? I mean, you're not fenced all
[1:28:30]
the way.
[1:28:31]
>> We are. To answer your question, there's
[1:28:33]
an existing fence on the um, if you're
[1:28:36]
looking at the property to the left.
[1:28:38]
There's an existing solid wood fence
[1:28:41]
there between the two properties.
[1:28:43]
Um, there is an existing fence along the
[1:28:46]
front. And there's also the existing
[1:28:48]
fence that's along Sand Hill, which is
[1:28:50]
actually not even on our property. It's
[1:28:53]
in the right of way. And so we are
[1:28:56]
removing that fence, but it has has been
[1:28:58]
working to a certain degree. I I I but I
[1:29:02]
think there's still wildlife that that
[1:29:04]
probably gets on the property. I I don't
[1:29:06]
live there, so I don't know. I I'm just
[1:29:08]
thinking between you and your neighbors.
[1:29:10]
Um are you going to use that fence
[1:29:13]
that's already there or
[1:29:14]
>> we our plan is to use that fence and not
[1:29:16]
added additional fence to have any
[1:29:19]
corridors. Correct.
[1:29:20]
>> We're not we're not trying to we think
[1:29:23]
that the creek is enough of a corridor.
[1:29:30]
» Yeah, that'd be great.
[1:29:37]
The property is open on three sides
[1:29:39]
essentially with just one neighbor with
[1:29:40]
a wood fence.
[1:29:41]
>> That's correct.
[1:29:42]
>> That's right. Yeah.
[1:29:43]
>> There's a lot of access around that
[1:29:45]
property.
[1:29:45]
>> Mhm.
[1:29:48]
>> Right.
[1:29:51]
>> Yeah.
[1:29:54]
» And and it's interesting the property
[1:29:56]
does um extend to the other side of the
[1:29:59]
creek from Whiskey Hill. So, there's a
[1:30:02]
little section up there that we're not
[1:30:04]
planning to do anything. But, um, you
[1:30:07]
know, I think we need to be careful not
[1:30:08]
to make that like a vacant open site,
[1:30:13]
um, for other, you know, for other
[1:30:15]
reasons. Um, so we will probably have
[1:30:17]
some kind of a security fence up there.
[1:30:20]
Um,
[1:30:21]
but that's I don't even know if we have
[1:30:23]
anything proposed other than what's
[1:30:25]
there already. So,
[1:30:27]
>> there's an existing white fence there,
[1:30:28]
right?
[1:30:29]
>> I think there's an existing wild. Yeah.
[1:30:31]
So,
[1:30:34]
I have to I have to be honest. I I
[1:30:36]
haven't spent much time on that little
[1:30:38]
piece of the property. Um
[1:30:42]
we've been focusing on the on this other
[1:30:44]
piece. It's it's it's been a wonderful
[1:30:45]
property to to work on and staff's been
[1:30:48]
great. So,
[1:30:53]
» any other questions?
[1:30:56]
I have one as far as the overall pitch
[1:31:00]
of that uh gable or arch before the door
[1:31:04]
and the pitch of the ex the other two
[1:31:07]
elements of the home. If the angle was
[1:31:10]
not quite as sharp, wouldn't it feel a
[1:31:12]
little softer and not as imposing as
[1:31:15]
what it feels? You with me? On the front
[1:31:18]
page when I'm looking and seeing,
[1:31:20]
>> could we pull the elevations?
[1:31:21]
>> This peak, this peak, and this peak, if
[1:31:25]
they were flattened out a little bit,
[1:31:27]
wouldn't it feel a little less
[1:31:30]
>> in your face sort of? Maybe it's just
[1:31:33]
plan I'm looking at.
[1:31:34]
>> We've we've chosen this particular roof
[1:31:37]
pits because it really really works with
[1:31:39]
the style quite well and and it's very
[1:31:42]
strong. Um I I don't again you're seeing
[1:31:47]
this without trees. So we didn't
[1:31:49]
superimpose any trees, you know, on
[1:31:52]
these elevations. There's a lot of trees
[1:31:55]
in the front actually that are existing
[1:31:57]
that we're maintaining and that's going
[1:32:00]
to go a long way. They're very tall and
[1:32:02]
so this house have a little bit of
[1:32:04]
height uh is not is not going to stand
[1:32:07]
out. And this roof pitch, you can see it
[1:32:10]
quite often in town. There's several
[1:32:12]
examples of that roof pitch.
[1:32:14]
>> It's interesting because when I look at
[1:32:16]
that versus looking at this, it doesn't
[1:32:18]
seem as severe a point.
[1:32:20]
>> Oh, yeah.
[1:32:21]
>> Just to add really the the plates on the
[1:32:24]
second floor.
[1:32:26]
>> Sorry, I'm Jaclyn Green.
[1:32:29]
>> Um the plates on the second floor have
[1:32:31]
been drastically reduced. So you you're
[1:32:33]
seeing standard 8 foot plates on the
[1:32:36]
second floor, not 10 or 11 or 12 or what
[1:32:38]
people like these days, only eight feet.
[1:32:40]
So that is that helps with the severity
[1:32:42]
of the height, but it's also going to
[1:32:44]
add character to the inside because
[1:32:46]
you're going to have vated ceilings
[1:32:47]
inside and a lower plate line. And it's
[1:32:49]
going to add these cool little nooks and
[1:32:50]
crannies on that second floor as you go
[1:32:52]
through the bridge to the other
[1:32:53]
elements. So we are aware of the
[1:32:56]
steepness. That's definitely part of the
[1:32:58]
style of the architecture. But in order
[1:33:00]
to reduce that overall uh impact, we've
[1:33:04]
brought the plate down. The whole second
[1:33:06]
floor has that 8ft plate.
[1:33:07]
>> Thank you.
[1:33:09]
I have a question on this bridge. So
[1:33:12]
this this bridge it's all light. So in
[1:33:14]
the evening is it going to be I mean it
[1:33:17]
be lit up really essentially. It's all
[1:33:20]
windows
[1:33:21]
>> there. There's a lot of it's a it's a
[1:33:23]
lot of windows. Um the um this house is
[1:33:27]
going to have shades and most of the
[1:33:30]
time these kind of these kind of windows
[1:33:33]
you know are going to be drawn in
[1:33:35]
nighttime for privacy. So, I don't think
[1:33:38]
that you're going to have a lot of light
[1:33:41]
uh impact coming out of these of these
[1:33:44]
rooms.
[1:33:45]
So,
[1:33:50]
our idea was to make this more of a
[1:33:52]
transparent and light. We tried to
[1:33:54]
lighten it up.
[1:33:59]
» What's on the back side of that bridge?
[1:34:02]
What you're seeing is that's the that's
[1:34:04]
the great room ceiling up there and
[1:34:06]
that's clad in stone. Has a flat roof.
[1:34:09]
So when you walk on that bridge, you can
[1:34:12]
see over that roof and out to the
[1:34:14]
backyard.
[1:34:16]
The whole house is focused on the back
[1:34:18]
of the rear, right? The whole
[1:34:20]
entertaining and the the pool and the the garden and the vineyards.
[1:34:28]
>> Okay.
[1:34:31]
Any other questions?
[1:34:35]
» Neighbor outreach.
[1:34:38]
>> I'm sorry.
[1:34:38]
>> Have we had any neighborhood outreach?
[1:34:40]
>> We haven't done any outreach yet. So,
[1:34:44]
we have had the story pulls up for a
[1:34:45]
couple weeks and we haven't heard any
[1:34:47]
anything.
[1:34:48]
>> Yeah.
[1:34:54]
I think with going to two stories, your
[1:34:56]
decision to push the house uh a little
[1:34:58]
bit further away from men's and either
[1:34:59]
way is a good decision to offset that
[1:35:02]
height a little bit.
[1:35:04]
>> How far is it from?
[1:35:06]
>> It's
[1:35:08]
the existing house is right on the
[1:35:10]
setback.
[1:35:12]
>> Oh, another
[1:35:13]
>> 20 70 something.
[1:35:15]
>> 70. Yeah. And also going up adding some
[1:35:18]
rooms upstairs um reduces our overall
[1:35:21]
footprint.
[1:35:23]
as well. We we started on one story and
[1:35:26]
we cl you know we we were starting to go
[1:35:29]
you know exceed the uh the the
[1:35:31]
coverages. So this helps to concentrate
[1:35:35]
it.
[1:35:38]
Okay.
[1:35:39]
Anybody else?
[1:35:45]
» Okay. Thank you.
[1:35:46]
Um without uh public
[1:35:49]
comment, anyone online?
[1:35:52]
>> There's no one online.
[1:35:54]
>> No one online. No one I see no one in
[1:35:56]
the room.
[1:35:57]
>> So uh we will skip public comment or
[1:36:00]
open and close it immediately. Uh and
[1:36:03]
move to board deliberation.
[1:36:07]
>> Okay. You need Okay, we're going to take
[1:36:11]
five minutes
[1:36:12]
>> break.
[1:36:15]
>> 60 seconds.
[1:36:20]
» Thank those knee replacements. Pretty
[1:36:23]
simple.
[1:36:47]
Yep.
[1:36:56]
You're all making it easy on us. It's
[1:36:58]
only 610.
[1:37:01]
» The last The last meeting you had was in
[1:37:03]
January.
[1:37:05]
>> Was it really
[1:37:06]
>> January?
[1:37:12]
So, yes, we're a little rusty tonight.
[1:37:16]
Developed a clear obsession around
[1:37:17]
fences for some reason. I'm not sure
[1:37:18]
where that's coming from, but
[1:37:26]
you can see the desire for security with
[1:37:28]
sand hill.
[1:37:58]
Okay. Uh, resuming. So, uh, board
[1:38:01]
deliberation. I'll kick it off tonight.
[1:38:04]
Um, yeah, I think I was hardressed to
[1:38:08]
put a label on style as well. So, but I
[1:38:11]
commend your efforts to integrate the
[1:38:14]
gables, stone, standing seam, metal
[1:38:16]
roof, flat roof. So, it I think it works
[1:38:20]
as a design. Um, I do have one
[1:38:24]
reservation. I'll echo Vice Chair
[1:38:26]
Commer's comments about the bridge and
[1:38:28]
the amount of glazing. Um, we often with
[1:38:31]
homes that are on hillsides projecting
[1:38:33]
outwards, we often are very concerned
[1:38:35]
about light projection. Um I think there
[1:38:37]
is some I I hold some reservations here
[1:38:40]
about just projection of light. We don't
[1:38:42]
want to we're hardressed to to accept uh
[1:38:47]
shades or blinds as a solution in this
[1:38:50]
case. Um so that's one area where I do
[1:38:54]
have some concerns about this especially
[1:38:57]
given that's facing away. Um,
[1:39:01]
but beyond that, I think overall, I
[1:39:03]
mean, it's a I think it's a good a good
[1:39:06]
approach to the design. Um, yeah, that's pretty much sums it up
[1:39:12]
for me.
[1:39:16]
» Well, one thing we've asked for in the
[1:39:18]
past has been, could the windows on that
[1:39:21]
backside be a glazing that is
[1:39:24]
non-reflective?
[1:39:26]
>> Yeah. And so something that come to my
[1:39:28]
mind when I hear the comments is we
[1:39:30]
actually just completed up a formal
[1:39:31]
design review with staff in which the
[1:39:33]
conceptual design review came to ASRB
[1:39:35]
and it had a fair amount of glazing on
[1:39:37]
the front of the building and uh one of
[1:39:39]
the solutions for that project was to do
[1:39:41]
what's called this low E glass. It's
[1:39:43]
like low emission glass. So it helps to
[1:39:45]
reduce the amount of light emission. Um
[1:39:48]
and so that's something that ASRB could
[1:39:50]
consider.
[1:39:53]
Could we require shades to be a part of
[1:39:55]
the
[1:39:57]
>> I you would just caution on that just
[1:39:59]
because you know the enforcement from
[1:40:02]
the town on something like that is just
[1:40:04]
not realistic.
[1:40:07]
» Yeah. The property developed below me uh
[1:40:10]
the plan was for this photochromatic
[1:40:13]
glass and they never implemented
[1:40:16]
>> even low E. Isn't that what we require
[1:40:17]
all the time pretty much? Uh there's
[1:40:20]
well there's low energy requirements but
[1:40:23]
this is something that's for light
[1:40:24]
emission in particular. Uh tell the
[1:40:27]
story that it's it sometimes called
[1:40:29]
turtle glass uh given that a lot of
[1:40:32]
large homes on the Florida coast were um
[1:40:36]
providing a lot of glazing and it was
[1:40:38]
creating problems for the turtles laying
[1:40:40]
their eggs on the beach at night. Um,
[1:40:43]
and so this was many years ago and a lot
[1:40:45]
of this glass technology kind of came
[1:40:48]
from that. Um, and trying to reduce the
[1:40:50]
light emission in particular.
[1:40:54]
>> I don't think we can require it, but is
[1:40:56]
this something that we can look into as
[1:40:58]
being part of an objective standard?
[1:41:00]
>> Yes, definitely. In terms of like the
[1:41:02]
amount of glazing, I think it's
[1:41:03]
something that um,
[1:41:04]
>> even the materials used like low E
[1:41:06]
glass,
[1:41:07]
>> right? Yeah, you low e glass could be
[1:41:09]
something to be looked at as well as the
[1:41:10]
amount of glazing percentages of walls,
[1:41:12]
things like that could be built into
[1:41:14]
objective standards.
[1:41:18]
» Anyone else?
[1:41:25]
» Liberation.
[1:41:27]
>> I I'm curious. Are are they looking for
[1:41:30]
a high?
[1:41:32]
>> Uh it is no not for this. Um I mean
[1:41:35]
we'll we'll get more information at
[1:41:37]
formal design review stage to verify
[1:41:38]
that. So I just always want that caveat.
[1:41:40]
But um at the way it's shown now it does
[1:41:43]
not appear that it would need any type
[1:41:44]
of height exception.
[1:41:47]
>> It didn't appear to have any exceptions.
[1:41:48]
Right.
[1:41:49]
>> It's just this moving of the driveway
[1:41:51]
which is the second driveway except
[1:41:53]
>> I can totally support that. I mean they
[1:41:55]
already have the second access, right?
[1:41:58]
So they're just trying to move it to be
[1:42:00]
better situated. It would be a different
[1:42:02]
conversation if they were asking for a
[1:42:04]
second drive and they only had one
[1:42:05]
currently.
[1:42:12]
Anyone else like to summarize their
[1:42:14]
thoughts and
[1:42:17]
position on this?
[1:42:18]
>> Yeah, I I I think it's a really nice
[1:42:20]
project that really makes excellent use
[1:42:21]
of the site and I didn't have any
[1:42:23]
questions or concerns. I do know that
[1:42:25]
often we talk about large glass uh
[1:42:27]
penetration being a concern about
[1:42:29]
flooding the neighborhood to a light,
[1:42:31]
but I have looked as I've driven around
[1:42:33]
Woodside, the newer glass products do a
[1:42:36]
lot to reduce emission. And I rarely
[1:42:40]
drive through Woodside and go, "Oh, wow.
[1:42:42]
There's a lot of light coming from that
[1:42:43]
big glass house." But I see a lot of
[1:42:46]
people with non-standard
[1:42:48]
uh light fixtures that put out enormous
[1:42:51]
amounts of light. That probably is where
[1:42:53]
we need to be as cautious as anything
[1:42:55]
and avoiding, you know, a lot of
[1:42:56]
uplighting, only doing down lighting and
[1:42:58]
some of the existing policies that are
[1:43:00]
trying to deal with that. But I thought
[1:43:02]
that design was great and would be a
[1:43:05]
wonderful improvement to the property.
[1:43:11]
» Yeah, I kind of echo that. I mean, I had
[1:43:13]
no issues with the pitch or the bridge.
[1:43:15]
You know, it all fits with what we
[1:43:18]
currently allow in in Woodside. I think
[1:43:21]
it's a great update. I think like I
[1:43:23]
said, moving the driveway makes sense to
[1:43:25]
align it with the motor court. Like if
[1:43:27]
you were starting fresh, that's exactly
[1:43:29]
where I'd put it.
[1:43:30]
>> Yeah, I don't really have any issues.
[1:43:35]
I would I would support moving to formal
[1:43:37]
staff.
[1:43:38]
>> Great. Thank you.
[1:43:41]
>> Hey, Sage.
[1:43:42]
>> Yes. Great. Okay. So I've heard uh so
[1:43:45]
the ASRB commended the applicant uh for
[1:43:48]
the design and materials of the building
[1:43:51]
um with the one somewhat concerned is
[1:43:54]
looking at the glazing at the bridge um
[1:43:57]
facing mansita in particular uh and
[1:44:00]
talked about possibility of implementing
[1:44:02]
some low e low light emission glass for
[1:44:05]
the project. Um, and other than that,
[1:44:09]
uh, their applicant commended for the
[1:44:12]
applicant for looking at the driveway
[1:44:13]
and the new location. Uh, and I'll just
[1:44:17]
add the caveat so long as it is, uh,
[1:44:20]
shown to be safe uh, through their
[1:44:22]
project engineer and verified by the
[1:44:24]
town engineering department. Um, but
[1:44:27]
with that, I heard one comment about
[1:44:29]
forwarding this to staff for formal
[1:44:31]
design review. um if they still needed
[1:44:34]
the second driveway exception and it
[1:44:36]
didn't have to come back to ASRB, it
[1:44:37]
would just go straight to the planning
[1:44:38]
commission and they would act on the
[1:44:40]
design and the second driveway
[1:44:42]
exception.
[1:44:44]
>> Okay. Do we have a motion?
[1:44:48]
>> I'd make the motion that it go straight
[1:44:50]
to the planning commission based on
[1:44:51]
those facts and that they would consider
[1:44:53]
the lighting plan somewhere along the
[1:44:56]
line.
[1:44:57]
>> I'll second that.
[1:45:00]
>> Chair Lindsay. Yes,
[1:45:02]
>> Vice Chair Comra.
[1:45:03]
>> Yes.
[1:45:04]
>> Member Deaggavio.
[1:45:05]
>> Yes.
[1:45:05]
>> Member Middleman.
[1:45:06]
>> Yes.
[1:45:07]
>> Member Sullivan.
[1:45:08]
>> Yes.
[1:45:10]
>> Thank you.
[1:45:11]
very much.
[1:45:12]
>> Thank you so much.
[1:45:16]
» And I apologize. Who second? Who do
[1:45:19]
this?
[1:45:19]
>> Second.
[1:45:20]
>> Done. Thank you.
[1:45:22]
>> Yep.
[1:45:27]
I always thought it was made notes on
[1:45:30]
that.
[1:45:31]
>> We all do just temple.
[1:45:33]
>> I would defer to Julia.
[1:45:36]
>> Okay. We have three director's reports.
[1:45:39]
>> Yes. And I
[1:45:40]
>> thank you very much.
[1:45:41]
>> It's a beautiful view.
[1:45:42]
>> Um what I what I'm going to do is just
[1:45:44]
primarily focus on March because that
[1:45:45]
has I think what we now now mainly talk
[1:45:48]
about is looking at the number of units.
[1:45:50]
Um so the uh the I think the second page
[1:45:54]
here has these um kind of different
[1:45:57]
graphs and it shows
[1:46:00]
that in January we didn't issue permits
[1:46:03]
for any new units. Um it's possible that really comes out of just being
[1:46:09]
after the holidays. Um and you know for
[1:46:13]
whatever reason it's still kind of the
[1:46:14]
middle of winter and people just at that
[1:46:17]
particular time didn't have permits
[1:46:19]
ready. Um February they noted that we
[1:46:22]
issued three permits for ADUs and one
[1:46:23]
for a single family dwelling. And then
[1:46:26]
in March we had six ADUs, one of them
[1:46:29]
being a Jadu and one new single family
[1:46:32]
dwelling. And April is over. I just have
[1:46:34]
not run that report. I'll probably do
[1:46:35]
that tomorrow.
[1:46:38]
» Um other than that, we continue to be
[1:46:40]
busy and I know we have had um kind of
[1:46:43]
this gap in time. We have had a lot of
[1:46:45]
applications come in um in the last uh
[1:46:49]
few months and um our team is full
[1:46:51]
again. Um one of our planners was out
[1:46:53]
for about eight months but she's back
[1:46:56]
now and so be great to help kind of move
[1:46:58]
some more of the stuff along.
[1:47:00]
>> Good get to talk much.
[1:47:04]
>> So is there do you see a trend now with
[1:47:06]
like new construction? I mean there's
[1:47:09]
clearly a lot more ADUs getting built at
[1:47:11]
this
[1:47:11]
>> Definitely a lot more ADUs for sure. Um,
[1:47:13]
and no, I you know, I think part of it
[1:47:15]
is is ADUs have kind of been
[1:47:18]
demystified. You know, I think, you
[1:47:20]
know, there's been just not just from
[1:47:21]
the town's perspective, but just all
[1:47:23]
over the state, a lot more focus and
[1:47:25]
people understand what they are, um,
[1:47:27]
understand that they can be attainable.
[1:47:29]
I you know and something that we promote
[1:47:31]
and are continuing to find ways to
[1:47:33]
promote more is that the town has signed
[1:47:38]
up as part of um this county ADU
[1:47:42]
resource center. Um so they also provide
[1:47:45]
other types of things that can help
[1:47:47]
people with looking at budgets or they
[1:47:50]
have different designs that you know we
[1:47:52]
always tell people to double check with
[1:47:53]
the town and make sure these designs uh
[1:47:55]
can fit within our parameters but most
[1:47:58]
of them do. Um, so there's other
[1:48:00]
resources that we are continuing to
[1:48:02]
promote and finding other ways to
[1:48:04]
promote better as well as we're
[1:48:06]
continuing to work on uh ADU standards.
[1:48:09]
Um, we went to the planning commission
[1:48:11]
in
[1:48:12]
um, uh, March, I guess getting confused
[1:48:16]
at I'm sorry, is April. Um, with uh,
[1:48:18]
some additional changes to ADU standards
[1:48:20]
to try to provide more flexibility. uh
[1:48:23]
they had a few comments and we're hoping
[1:48:25]
to bring that back to them on May 20th
[1:48:28]
before it goes to the town council. So
[1:48:30]
just again continuing to work on ways to
[1:48:33]
provide more flexibility for use.
[1:48:35]
>> I know that we passed I think we were
[1:48:38]
required to do it by the state but that
[1:48:40]
we were have
[1:48:43]
pre-approved
[1:48:46]
ADU.
[1:48:47]
>> Yeah. So there's a you know essentially
[1:48:49]
the we have we'll just follow the state
[1:48:52]
law for that. There's a process for
[1:48:53]
that. No one has applied for that. Um so
[1:48:56]
as an architect or a prefab company they
[1:49:00]
could come into the town and say we'd
[1:49:02]
like for you to just look at our
[1:49:03]
building itself. It won't be a
[1:49:05]
foundation or actual site review but
[1:49:08]
does it meet the height and the size
[1:49:09]
which are basically the two criteria. Um
[1:49:12]
and so they could do someone could you
[1:49:14]
know any company could apply for that be
[1:49:17]
reviewed by the town to ensure that it's
[1:49:19]
okay and then from there um they would
[1:49:22]
have then we would post that on our
[1:49:23]
website directly. So the question of the
[1:49:26]
question was would this board be
[1:49:29]
involved in any way with that review or
[1:49:30]
>> no these are just things that do they
[1:49:32]
meet code um and so uh and so it's just
[1:49:36]
based up
[1:49:36]
>> it's a guideline aspect of
[1:49:39]
>> to the extent of yes I mean they have to
[1:49:41]
meet the objective criteria for the ADUs
[1:49:44]
um and so uh this ADU resource center
[1:49:48]
they have a lot of people have gone
[1:49:50]
through them and had that posted online
[1:49:52]
um you know for example If one ADU had a
[1:49:55]
20ft plate height limit, that just
[1:49:57]
wouldn't meet our code requirement.
[1:49:59]
>> But with regards to like colors or, you
[1:50:02]
know, facades, the only way that this
[1:50:04]
board could have any input on what those
[1:50:06]
are is through
[1:50:08]
the generation of objective standards.
[1:50:11]
>> That's correct. If there were some
[1:50:12]
objective design standards would
[1:50:13]
definitely involve the ASRB,
[1:50:15]
>> which leads into the other question I
[1:50:16]
had. you know, we've had fencing, color,
[1:50:19]
and lighting come up regularly when
[1:50:22]
we're viewing,
[1:50:23]
>> you know, project after project. And
[1:50:25]
we've also had a very large gap. And
[1:50:28]
maybe I'm going to put my foot in my
[1:50:29]
mouth and say that it's been a light
[1:50:30]
year.
[1:50:32]
>> Um, but
[1:50:34]
yeah, would it be in this board's
[1:50:36]
perview to have a study session on those
[1:50:38]
three topics and and then maybe come up
[1:50:40]
with some suggestions for a future
[1:50:42]
objective standard?
[1:50:44]
>> Uh, yes. If the town is to engage in
[1:50:46]
that process, we'd definitely in involve
[1:50:48]
the ASRB in that
[1:50:50]
>> stage at this point. If people are, we
[1:50:52]
know people are building ADUs, they
[1:50:55]
don't have to come by our
[1:50:57]
>> That's correct. They go straight to the
[1:50:58]
building permit.
[1:50:59]
>> Yeah.
[1:50:59]
>> And are they somewhere that we'd be able
[1:51:01]
to look up and see that? Like I've got
[1:51:03]
one popping up on my street and I'm
[1:51:05]
like, "Oh, I wonder what it's going to
[1:51:06]
look like."
[1:51:07]
>> Sure. Yeah. So, uh, the plans are all
[1:51:09]
public record. Um, so we can't give
[1:51:11]
copies of them out without the
[1:51:13]
architect's permission. Um, but they're
[1:51:15]
always available at town. Um, so you can
[1:51:18]
we have open counter hours Monday
[1:51:20]
through Thursday in the mornings. Um,
[1:51:22]
that's one way I always encourage people
[1:51:23]
to just maybe set up an appointment with
[1:51:25]
somebody. Um, and they can sometimes do
[1:51:27]
that after the counter hours as well.
[1:51:29]
Uh, so that's just so you ensure someone
[1:51:31]
will be there and easily be able to
[1:51:33]
>> So that's not online anywhere to look
[1:51:34]
at.
[1:51:34]
>> No, it's just because we because then
[1:51:36]
people can make copies of it.
[1:51:37]
>> Oh, I see. Got So that's why those
[1:51:39]
particular plans are just viewable at
[1:51:41]
town hall.
[1:51:42]
>> Thanks.
[1:51:44]
>> I see people now instead of
[1:51:49]
they're doing sort of mobile homes
[1:51:54]
with
[1:51:56]
>> Is that
[1:51:58]
>> um it's not in Woodside. Um it's
[1:52:00]
something that you know there's you know
[1:52:02]
the tiny homes and even mobile homes in
[1:52:05]
general um those are not permitted in
[1:52:09]
Woodside in terms of being able for
[1:52:11]
someone to live in. Um you can store a
[1:52:14]
mobile home on your property but the
[1:52:16]
main issue is um
[1:52:20]
uh safety. Um are they connected to
[1:52:23]
septic systems? Are the septic systems
[1:52:25]
evaluated for that? Um they're not on a
[1:52:28]
foundation. we have a lot of
[1:52:30]
geotechnical issues in the town of
[1:52:31]
Woodside. Um, and so that's the primary
[1:52:35]
reason is that they're not a fixed to a
[1:52:37]
foundation. Uh, and so that any any
[1:52:40]
habitable living unit needs to comply
[1:52:43]
with those standards
[1:52:46]
at least for Woodside. I I can't speak
[1:52:48]
to other jurisdictions and how things
[1:52:49]
are.
[1:52:49]
>> People that are doing it.
[1:52:57]
» Okay. that I will adjourn at whatever
[1:53:00]
that is 6:24
[1:53:06]
>> done.
[1:53:07]
>> Thanks.
[1:53:07]
>> Thank you.
[1:53:08]
We're back.