Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:05]
Planning Board, I call to order. Tuesday, August 4th,
[0:09]
2026, at Westbrook High School, Room 114,
[0:13]
125 Travelor Street.
[0:16]
This meeting will be offered as a hybrid meeting accommodating both in-person
[0:20]
and remote participation. The link and phone number to join the meeting
[0:24]
through Zoom is located on the Planning Board agenda, which can be found on the
[0:27]
City of Westbrook website,
[0:29]
westbrookmaine.com/agendacenter.
[0:32]
Where public comment is permitted, members of the public attending remotely will
[0:36]
also have the opportunity to provide remote testimony.
[0:39]
If you wish to speak during a public hearing or a public comment,
[0:43]
use your raise hand function through Zoom or dial nine
[0:47]
on your phone when instructed by the Planning Board chair.
[0:50]
Comments will only be accepted during a public hearing or
[0:54]
public comment period and should remain specific to the application as being
[0:58]
discussed.
[0:59]
With that, roll call, Jenna, please.
[1:04]
Karen Axelson?
[1:06]
Here.
[1:09]
Jason Frazier?
[1:10]
Here.
[1:11]
Nancy Lichochapies?
[1:13]
Here.
[1:14]
Kevin Price?
[1:15]
Here.
[1:16]
Robin Tanebaum?
[1:17]
Here.
[1:18]
Oriana Farnham?
[1:19]
Here.
[1:20]
Lucas Shrake?
[1:21]
Here.
[1:22]
Larry McWilliams?
[1:23]
Here.
[1:23]
And John Turcotte.
[1:24]
Here.
[1:26]
Thank you.
[1:27]
With that, we'll go into regular business.
[1:29]
Orlando, can you read the first item in the record, please?
[1:33]
Item number 24-000632:
[1:37]
Site Plan Approval Extension Request, 4 and 7 Kitter Lane, Quaker
[1:41]
Lane Associates, LLC. The applicant is requesting an extension on their
[1:45]
site plan approval in a phased project schedule.
[1:48]
Tax Map 032, Lot 107, and Tax Map
[1:52]
032, Lot 109, Zoned City Center District.
[1:57]
Thank you. With that, can we have the applicant presentation, please?
[2:11]
Good evening. My name is Craig Burtis with Acorn Engineering.
[2:15]
Looks like I have the wrong project up here.
[2:18]
I don't know if I necessarily need presentation slides tonight.
[2:21]
As mentioned, this is for a site plan approval
[2:25]
extension. It was originally approved last year and then
[2:29]
amended in September. So the client is looking to actually
[2:33]
start construction this fall,
[2:36]
and he's looking at performing the work in a phased approach.
[2:39]
Phase one will include the initial site
[2:43]
setup,
[2:44]
which will involve demolition of
[2:48]
existing buildings, pavement, gravel, utilities,
[2:52]
installation of all the erosion control that's shown on
[2:56]
the civil plan drawings,
[2:58]
and then also installing a lot of the heavy utility work.
[3:02]
That includes
[3:04]
installing the conduit for the gas main,
[3:08]
the sanitary sewer connections, as well as
[3:13]
some of the three-phase electrical work.
[3:16]
Also included in the phase one is all the
[3:20]
main storm drain runs. So there's storm drain runs that go from west
[3:24]
to east across the site, as well as replacement of,
[3:28]
there's a 48-inch pipe that runs right underneath Dana
[3:32]
Street out toward Presumpscot River.
[3:34]
So phase one includes replacement of that pipe, that 48-inch
[3:38]
pipe, as well as a lot of the main storm drain runs.
[3:41]
Not included in phase one are all the
[3:44]
storm tree filters and the rain garden.
[3:48]
So those will be constructed in phase two.
[3:51]
So in your packets, there are construction cost estimates
[3:55]
for both phase one and phase two. Phase two is anticipated
[3:59]
to start next spring,
[4:03]
weather dependent, as soon as the site contractor can get in there.
[4:07]
Likely March, maybe April. So they're looking to start the phase two
[4:12]
next year. So there's a lot more work in phase two.
[4:16]
And then
[4:17]
the erosion control will have to be
[4:20]
reevaluated in spring. So as part of the phase one, they'll
[4:24]
install the erosion control. There'll be a lot of double layers of silt
[4:28]
fence installed along Presumpscot River.
[4:30]
That will likely sit during the wintertime while the site is dormant.
[4:34]
And then when they come to the site next spring, they'll have to revisit the
[4:38]
erosion control, and then the city will likely have to do
[4:42]
inspections to make sure that's up to par, and then they'll go ahead and initiate
[4:45]
phase two.
[4:46]
We understand that there's some work before construction starts this fall,
[4:50]
including the pre-con meeting. There's still some minor
[4:54]
site plan changes out there that Acorn Engineering needs to
[4:58]
address, including depicting how the river walk connects
[5:02]
over to the Saccarappa Park parcel.
[5:04]
So we intend to do that, and construction is supposed to start this
[5:08]
fall. So I'll leave it to the planning board.
[5:12]
I'm here to respond to any questions that you have. Thank you.
[5:15]
Thank you, Craig.
[5:17]
Staff response?
[5:19]
Yep. So as Craig stated, this started with a site plan approval extension
[5:22]
request because the approval would have been set to expire in September.
[5:27]
But then with that, in talking with the development team
[5:30]
and coordinating with the Saccarappa Park project, which is also
[5:35]
working towards getting ready to start, there was a desire to phase the
[5:39]
development out. How the conditions are currently written, if they were to start
[5:43]
with the utility work this fall, they would have to put in the full performance
[5:47]
guarantee for the overall project, as well as have the site work contractor
[5:51]
to do the pre-con and things that they weren't necessarily
[5:55]
ready for now, although there's benefit for getting the
[5:59]
demolition done now and the utility work in the Saccarappa Park side of the
[6:03]
project in coordination with that side.
[6:05]
So that was the impetus to the phased approach,
[6:09]
was to separate that out so they would provide the performance
[6:13]
guarantee for just that site work, be able to proceed with that in the fall,
[6:17]
and then have the full performance guarantee for the overall project when they're
[6:20]
ready to move forward in the
[6:22]
Spring, ideally.
[6:24]
So with this, as Craig said, you have the separated
[6:28]
cost estimates in your packet. We also slightly amended the conditions
[6:32]
to allow for a call-out for the commencement of work in phase one and of
[6:36]
work in phase two. But there weren't any substantive changes
[6:40]
to the conditions other than what would be required before the commencement of each
[6:44]
one of those phases.
[6:47]
Thank you.
[6:50]
This is open to the public comment.
[6:52]
Do we have anybody in the public that wishes to speak on this issue?
[6:56]
I see none. Any through Zoom?
[7:00]
If there's anyone participating via Zoom and would like to speak, please raise
[7:03]
your hand.
[7:07]
I'm seeing none.
[7:08]
Okay. With that, I'll close the public comment.
[7:11]
Any
[7:12]
board members, any comments?
[7:17]
Through you to the planner. The amendment from last September, that was just an
[7:20]
amendment. That was, in itself, an extension, correct?
[7:23]
That was just an amendment to the subdivision, but with that, it inherently kind of
[7:27]
restarted the clock-
[7:28]
Okay
[7:28]
... for when the 12 months is. But yes.
[7:29]
Okay, so this is their first extension request?
[7:31]
Yes.
[7:32]
All right, thank you. I think everyone gets one extension. It's a big project.
[7:35]
I don't have a problem with it.
[7:37]
Thank you, John.
[7:39]
Anyone else?
[7:42]
Okay, I see none. The only thing I did see, just by looking at some
[7:46]
of the paper, I'm still learning all the grading and the underneath work and
[7:51]
so forth, but what I did notice was on the 48-inch pipes, they're now going to
[7:54]
plastic-
[7:55]
Yes
[7:55]
... versus concrete. How long has something like that been going on?
[7:58]
And I guess it's more cost-effective.
[8:01]
Yeah. It's more cost-effective. It lasts just as
[8:05]
long. It's easier to handle on the site.
[8:08]
It's easier to just move around the site. The concrete pipe, it's a lot heavier.
[8:12]
So yes, a lot of the bigger pipe now is the HDPE, the
[8:16]
high-density polyethylene plastic.
[8:18]
Yeah, I saw that. I was interested in that just because it looks like it'd be a lot
[8:22]
easier to work, and it does have the same lifespan as concrete, so.
[8:25]
Yes.
[8:25]
All right, cool. That's my only question, so yeah, I have no other problems with
[8:28]
that.
[8:30]
With that, we have a motion on page two
[8:33]
of our memos.
[8:36]
If somebody would be so kind.
[8:37]
Mr. Chair?
[8:37]
Yes, John.
[8:39]
I move to approve the request from Quake Lane Associates for a one-year extension
[8:42]
in phased project schedule on the site plan approval, dated April 15th, 2025,
[8:46]
and amended September 2nd, 2025, for the demolition and redevelopment
[8:50]
of the parcels located at the end of Kidder Lane to construct a
[8:54]
multi-story, mixed-use complex to include 110 residential units,
[8:58]
a commercial use, and a westerly expansion of the Riverwalk Trail
[9:02]
located on the parcels identified as four and seven,
[9:06]
Kidder Lane, Tax Map 32, Lots 107 and 109,
[9:10]
Zoned City Center District, Village Review Overlay Zone, and Shoreland
[9:14]
Zone. All previously approved findings of fact and conclusions of approval
[9:18]
associated with the September 2nd, 2025, approval
[9:22]
remain applicable. Wow. Approval
[9:26]
also includes the following conditions, as stated on page two through four of this
[9:30]
staff memo dated July 31st, 2026, which are adopted in
[9:33]
support of this approval.
[9:35]
Thank you. Can I get a second, please?
[9:37]
Second.
[9:37]
Thank you, Kevin. Roll call, Jenna.
[9:43]
Robin Tannenbaum?
[9:45]
Yes. Oh, sorry.
[9:48]
Nancy Litwak Abes?
[9:50]
Well, so formerly, I recused myself from this project, but it's an
[9:54]
extension, so I don't know, do I vote or just recuse?
[9:57]
If you feel that you can be impartial to the extension and the board is
[10:02]
okay with that, then you can stay on.
[10:05]
I'm in support of the extension.
[10:09]
No problem. Thank you.
[10:12]
Jason Frazier?
[10:13]
Yes.
[10:15]
Karen Axelson?
[10:16]
Yes.
[10:17]
Kevin Price?
[10:18]
Yes.
[10:20]
Lucas Shrake?
[10:21]
Yes.
[10:22]
Oriana Farnum?
[10:23]
Yes.
[10:25]
John Turcotte?
[10:26]
Yes.
[10:28]
And Larry McWilliams.
[10:30]
Yes.
[10:31]
Seeing unanimous. Thank you. With that, we go into new business.
[10:34]
Orlando, can you-
[10:35]
Thank you
[10:35]
... read the next item in the record, please?
[10:38]
Item number 26-000527, site
[10:42]
plan, 3 Saunders Way, WWS Properties, LLC.
[10:46]
The applicant is requesting a renovation and an expansion to the existing Bill
[10:50]
Dodge Kia automobile dealership, including a 2,160
[10:54]
square foot addition to the service area and a 3,850
[10:58]
square foot addition to the showroom.
[11:00]
Tax Map 042B, Lot 113, Zone
[11:04]
Gateway Commercial, use automobile dealership repair service.
[11:08]
Thank you. With that, applicant presentation.
[11:13]
All right. Good evening. It's Dustin Roma with DM Roma Consulting
[11:16]
Engineers.
[11:18]
There we go.
[11:20]
I'm here tonight representing WWS Properties for this proposed
[11:24]
expansion at the Bill Dodge Kia auto facility on 3
[11:28]
Saunders Way.
[11:33]
Just trying to get organized here.
[11:37]
So we were here as a sketch plan workshop item
[11:42]
at the last meeting, and since then, really just been working
[11:46]
closely with Kia on a review of the proposed
[11:50]
renovations. This building is one of the buildings on
[11:54]
the complex here, which is essentially one of the older buildings that's there,
[11:58]
or the one that
[12:00]
is
[12:02]
most in need of renovations as far as
[12:05]
kind of a new facelift on these projects.
[12:07]
So we're excited to be able to work with Kia and Bill Dodge to kind of make some
[12:11]
improvements to this one building facility here.
[12:15]
Pretty much all of the improvements are really the main part that you
[12:19]
see as you come into the property. So it's the sales and
[12:22]
service area that's kind of
[12:25]
For
[12:26]
right in the front of the building there.
[12:28]
So that's going to be the location where most of these improvements are being made.
[12:32]
We do have a small service area that's being expanded
[12:37]
on the backside of the building to kind of square off the structure.
[12:40]
And then we'll be doing some pavement improvements around the perimeter of the site
[12:44]
as well.
[12:46]
We'll be putting in some new vehicle charging stations for the electric
[12:49]
vehicles outside the building.
[12:53]
And then we've got some improved landscaping areas that'll take
[12:56]
place at the transition between this property and the Infinity
[13:00]
property.
[13:02]
So we've got some landscaping improvements there.
[13:06]
And then other than that, the major circulation components of the
[13:09]
site are pretty much unchanged.
[13:12]
This property has access from essentially two
[13:16]
adjacent building areas, so there's a site access
[13:20]
from
[13:22]
either side, and that's going to remain.
[13:26]
Let's go here.
[13:29]
So there's a site plan there. So as you can see, this particular property by itself
[13:33]
doesn't have its own curb cut, but there's curb cuts on either side.
[13:36]
And we've just had some discussions with city staff just to make sure
[13:40]
everyone was comfortable with the vehicle circulation around the building, and
[13:45]
really nothing substantial will change there.
[13:48]
Additional sidewalk areas and concrete
[13:52]
vehicle display areas will be kind of prominent in the front part of the
[13:55]
site.
[13:58]
And as far as the lighting on the facility,
[14:01]
there's one existing light pole that will be removed
[14:06]
to make room for the building expansion,
[14:09]
and there's a second light pole that'll be located inside the
[14:13]
landscaped island area that we're retaining, so that light pole will
[14:17]
remain.
[14:19]
So no real changes to the lighting.
[14:21]
We're not upgrading any of the fixtures or anything on the pole-mounted lighting in
[14:25]
the facility, so it's going to basically stay as it is.
[14:29]
The last item that we've been working with the city on is the signage.
[14:32]
We do have
[14:35]
a updated signage that'll happen.
[14:37]
The Kia logo has changed, so updated
[14:41]
signage on the building as well as a new pylon sign.
[14:44]
So there was some language in the memo which just
[14:47]
outlined
[14:50]
our request to basically replace that existing pylon sign that's out front with a
[14:54]
new sign. So those details, again, will be worked
[14:58]
out through code enforcement. As far as the size of the sign, what's allowed, we've
[15:02]
got a few options that we're working through with Kia now.
[15:06]
And we're satisfied that whatever sign we choose, again, we'll just make
[15:10]
sure we work through codes and that it's
[15:14]
no larger than
[15:16]
is permitted. So,
[15:19]
with that, I've got some additional graphics here just showing building elevations
[15:22]
that I can skip to if we need to. Otherwise, happy to
[15:26]
answer your questions if you have any. Thank you.
[15:29]
Thank you, Dustin.
[15:31]
Staff comment?
[15:33]
Nothing to add from Dustin's presentation.
[15:35]
Okay, thank you. With this is also a public comment.
[15:38]
Does anybody from the public wish to speak on this
[15:42]
addition? I see none. Any through Zoom?
[15:46]
If there's anyone participating via Zoom and would like to speak, please raise your
[15:50]
hand.
[15:52]
I'm seeing none.
[15:53]
Okay, thank you. With that, I'll close the public comment.
[15:56]
Any board comments?
[16:01]
Seeing none.
[16:03]
I've got a question.
[16:03]
Yep, sorry. Go ahead, Robin.
[16:04]
Thanks. And Dustin, I remember asking about this last time.
[16:08]
Planting plans, and I know there's not a lot of
[16:11]
area for that, but there's that little corner area that I think already
[16:15]
exists, or actually maybe it's new.
[16:17]
Can you talk about any plans for planting or any street trees?
[16:21]
Yep.
[16:22]
So we do have existing
[16:25]
street trees that run along Saunders.
[16:27]
But yeah, this area right here in this front corner is really kind of our prime
[16:31]
spot to be able to
[16:34]
add some decorative landscaping.
[16:36]
So we do have some trees and shrubs and perennials
[16:40]
in that landscaped area there, which right now it's pretty much grass.
[16:44]
There's a few just evergreen shrubs, no color or anything.
[16:48]
So it looks a little different. When you look at the Infinity building, which is
[16:51]
one of the newer ones that we've done, we've got daylilies and color and things
[16:54]
around the perimeter, so we're trying to kind of match that in the front of the
[16:58]
building here.
[17:04]
Thank you. With the sign, I know on the board or on the
[17:08]
building itself, the front, is that going to be lit up, the Kia s- the...
[17:11]
Because-
[17:11]
Yeah
[17:12]
... is it already now? Because I don't
[17:16]
go down that direction, but
[17:18]
on the side of the building, so that it just looks like it would look nice
[17:22]
if it was lit up at night, especially with the glass in the front.
[17:25]
So I didn't know
[17:26]
if that was going to be illuminated all the time.
[17:28]
Yep.
[17:28]
Okay.
[17:29]
Yeah, they'll be internally illuminated, especially it's very helpful in the winter
[17:32]
months and stuff when it's dark out at 4:30, and...
[17:36]
Oh, yeah. No, the building looks nice.
[17:38]
It's going to be a nice addition to
[17:42]
the upgrade. So,
[17:44]
with that, we have a motion
[17:47]
on page...
[17:52]
Mr. Chair?
[17:53]
Yes.
[17:53]
I move that the planning board approves the site plan application for
[17:57]
WWS Properties LLC to renovate and expand the existing Bill Dodge
[18:01]
Kia automobile dealership, which includes a 2,160
[18:05]
square foot addition to the service area and a 3,850 square foot
[18:09]
to the showroom. Tax Map 042B, Lot
[18:13]
113, Zone Gateway Commercial. Approval includes the following findings
[18:17]
of facts, conclusions, and conditions as stated on pages five through seven
[18:21]
of the staff memo dated July 31st, 2026, which are
[18:24]
adopted in support of this approval.
[18:26]
Thank you. Can I get a second, please?
[18:29]
Second.
[18:30]
Thank you, Karen. Can I have a roll call vote, Jenna?
[18:35]
Robin Tannenbaum?
[18:37]
Yes.
[18:39]
Nancy Litokapes?
[18:41]
Yes.
[18:42]
Jason Frazier?
[18:43]
Yes.
[18:44]
Karen Axelson?
[18:45]
Yes.
[18:47]
Kevin Price?
[18:48]
Yes.
[18:49]
Lucas Shrake?
[18:50]
Yes.
[18:51]
Oriana Farnham?
[18:52]
Yes.
[18:54]
John Turcotte?
[18:55]
Yes.
[18:56]
And Larry McWilliams.
[18:57]
Yes.
[18:58]
Seeing it's unanimous, thank you.
[19:01]
Orlando, can you read the next item into the record, please?
[19:05]
Item number 26-000275, site
[19:09]
plan subdivision conditional use, Marco Commons, MTR
[19:12]
Development LLC. The applicant is proposing to subdivide a parcel of
[19:16]
vacant land located between 547 and 563 Saco
[19:20]
Street into three lots and develop two of 12-unit
[19:24]
multifamily buildings which will be accessed by a shared private driveway.
[19:29]
Tax map 004, lot 013, zone residential
[19:33]
growth area 2, use dwelling multiple family.
[19:37]
Thank you.
[19:39]
With that, can we have the applicant presentation?
[19:41]
Sure. Yep, me again.
[19:43]
Hi, Dustin.
[19:44]
Dustin Roma with DM Roma Consulting Engineers, representing MTR
[19:48]
Development for this proposed project at 547 Saco Street,
[19:52]
which we've been referring to in the plans as Marco Commons.
[19:57]
So the plan that I've got in front of you here depicts
[20:03]
what we've been calling the first phase of this development.
[20:06]
There's some language in the
[20:09]
packet here which kind of talks about a multiple-phased approach that
[20:13]
we've been working on in this project.
[20:15]
So, this initial phase is going to
[20:19]
divide the property up into four lots.
[20:24]
One of those divisions has already occurred.
[20:26]
So the existing farmhouse that's on the property has been
[20:29]
separated off on its own lot, and that property has since been
[20:34]
conveyed.
[20:36]
And then what we're proposing is the creation of essentially three new
[20:40]
lots on the remaining land.
[20:42]
One lot will be created around an existing barn
[20:46]
structure that's on the property.
[20:48]
The intent is for that building to stay
[20:52]
currently. At some point in the future, the plan would be for
[20:56]
that to be a single-family residential lot
[21:00]
if that building were to be knocked down, but that isn't anything
[21:04]
we're looking to do anytime soon. So we want to kind of keep the barn up there and
[21:08]
utilize it for
[21:10]
whatever uses are permitted in the zone.
[21:14]
One of the lots on the
[21:16]
left-hand side or the Scarborough side of the property, we'll be
[21:20]
creating that lot that is of adequate size for a
[21:24]
duplex. And then the remaining land,
[21:28]
we're currently proposing two 12-unit
[21:31]
buildings for residential use on that remaining
[21:34]
piece.
[21:36]
We did include an overall master plan in our
[21:40]
packets here, which just kind of lays out
[21:43]
what our goal is for an ultimate build-out of this
[21:46]
property. But it's certainly nothing that we're
[21:51]
asking the board to comment or commit on at this time.
[21:54]
We're really just seeking approval for these first two 12-unit
[21:58]
buildings and the division of the property to create the duplex lot and the single
[22:01]
family.
[22:03]
But we did think it was important to continue the discussion with the board so that
[22:06]
everybody can kind of see the vision as to where we hope to end up with this
[22:09]
project here at some point.
[22:12]
But again, what's here tonight is just the two 12-unit buildings on this larger
[22:15]
lot.
[22:17]
This plan shows the extent of a trail network that
[22:21]
we're going to be enhancing and improving.
[22:25]
There are some trails that kind of work their way through the property, but
[22:29]
this shows an area that we're looking to enhance those trails.
[22:33]
So this will be a walking area for the residents of the development,
[22:38]
and this is something that we had presented to the Recreation
[22:42]
Conservation Commission as part of
[22:45]
our open space design requirements, which they've
[22:50]
accepted as being suitable in conjunction with a
[22:53]
off-site sidewalk that we're also proposing as well.
[22:58]
So the off-site sidewalk piece of this is something we've had kind of extensive
[23:02]
conversations and discussions with city staff on, because
[23:06]
it's something that's kind of being
[23:10]
done at the front end of the project.
[23:12]
A lot of times these off-site improvements get done kind of later on, but we
[23:16]
do have some timing constraints with the repaving project that's occurring on
[23:20]
Saco Street, so we've been working kind of closely with the city just to make sure
[23:23]
we're getting all the pieces put in place to work through those time
[23:26]
constraints.
[23:28]
But what's outlined in your proposal here is that we're going to be building
[23:33]
all of the sidewalk out along the frontage of the property as part of this
[23:37]
initial project phase. So it will extend down the
[23:41]
road heading towards Elm Maple Drive, up until
[23:45]
the existing driveway entrance that is at
[23:49]
521 Saco Street. So we'll build up to that location now complete,
[23:53]
and then we'll also head north and bring the sidewalk
[23:57]
up to a point where we're going to be painting a crosswalk across the street, doing
[24:00]
tip downs, and putting in a rapid flashing beacon at that
[24:04]
location to allow people to cross the street there.
[24:07]
So we think these are benefits that'll help the residents of our
[24:10]
neighborhood, but we also have The Hamlet and other neighborhoods around
[24:14]
where folks are coming down. There's a bus stop across the street from our
[24:18]
development. So the thought is that all of these things will
[24:22]
help the pedestrian movements around this area, make it safer,
[24:26]
make people feel like they can use the amenities that are there.
[24:31]
As far as the development itself
[24:36]
Here's a landscaping plan that we're proposing for the project.
[24:39]
So
[24:41]
we've got a single entrance driveway coming in.
[24:44]
That driveway will also serve as the entrance to those other two
[24:48]
lots that we're creating. So the duplex lot and the single-family lot will both be
[24:52]
accessed off this Marco Drive shared
[24:55]
private access way. So no new curb cuts on Saco
[24:59]
Street. The two curb cuts that exist currently that provide kind of a loop
[25:03]
driveway for the farmhouse, one of those will be closed off,
[25:07]
and that existing barn structure will be accessed from this new
[25:12]
driveway.
[25:14]
One of the comments that we received when we had our neighborhood meeting, as well
[25:18]
as when we were last here in front of the planning board for our workshop, was
[25:22]
the proximity of these two proposed multi-family buildings to the
[25:26]
adjacent property to our south at the 521 Saco
[25:30]
Street lot.
[25:32]
So what we did is we've moved the whole project as far away from that
[25:36]
property line as we could. We do have the existing pond and some wetland
[25:40]
areas that are on that northern side of the property, so we basically
[25:43]
pulled everything as far away from that property line as possible.
[25:46]
And this is substantially more
[25:51]
separation there than what it was previously.
[25:54]
We've also angled the development a little bit, so it's not
[25:57]
necessarily looking right straight into
[26:01]
the property,
[26:03]
just so that you're not looking directly at the backside of those buildings.
[26:06]
In moving those buildings away from the property line, we're also able to
[26:10]
retain all of the trees that are along that property line currently.
[26:14]
With the old design, we could have retained them as well, but we would have been
[26:18]
very close to them. This way, we've got plenty of space pulling those
[26:21]
away from that property line.
[26:26]
Let's see.
[26:33]
I think at this point,
[26:36]
again, we appreciate staff working with us up to this point
[26:40]
with all the upfront planning.
[26:43]
And I know the applicant is
[26:46]
ready to start this project here
[26:49]
as soon as approvals are granted. So this is kind of their next project to
[26:53]
move into. So
[26:56]
I think we've addressed the comments that have been brought to us to date.
[26:59]
There are a few things in the memo here just in regard to how we're going to
[27:03]
separate the subdivision plan, the site plan,
[27:08]
putting notes on those so we can kind of have separate recording plans and separate
[27:11]
approval plans. So all that information's got some good instructions here
[27:15]
in the packet that we can incorporate.
[27:20]
And we're prepared to do that, and
[27:23]
it seems pretty straightforward.
[27:27]
I think there was a couple other things in the memo just in regard to the
[27:31]
city's involvement going forward with the sidewalk area.
[27:34]
But I think maybe I'll just let
[27:38]
Rebecca elaborate a little bit on that just so I don't misspeak on any of
[27:42]
the things that the city is proposing to step up and assist with on that end.
[27:46]
So
[27:47]
with that, I'll turn it over and we're here to answer questions.
[27:51]
Thank you, Dustin.
[27:53]
Staff response with that, would you?
[27:57]
Yeah.
[27:58]
So what's before the board right now, there's actually kind of two applications
[28:02]
happening, so I just want to reiterate that what is up for looking for approval
[28:05]
tonight. There's the land subdivision, and then step into what's
[28:09]
being identified in the plans as lots one, two, and three.
[28:12]
As Dustin said, there is technically a fourth lot, but that was carved off
[28:16]
previously. Per subdivision law, it's a subdivision once
[28:20]
a parcel becomes three parcels within a five-year period.
[28:24]
And so legally they were able to carve off one lot, but as soon as they're
[28:28]
creating a second lot, that's what triggers the subdivision review.
[28:31]
So the lot that's been carved off is already legally a separated lot, and
[28:35]
before the board is the creation of the three now new lots.
[28:40]
With that, as Dustin said, lots one and two are proposed to
[28:44]
have shared access off of Marco Drive.
[28:47]
They will not have separate curb cuts onto Saco Street.
[28:51]
And
[28:54]
then lot three is a separate site plan subdivision, which is
[28:58]
currently the two 12-unit structures that you see before
[29:01]
you. A couple other points I wanted to touch on.
[29:04]
So the Recreation and Conservation Commission, as Dustin said, reviewed
[29:08]
this plan. The overall
[29:11]
open space plan here is a little unusual for how we typically do things.
[29:16]
But given the design here, clustering, we looked at
[29:20]
the overall master plan. We really didn't want to separate this out into phase one
[29:23]
when we knew the overall master plan was coming, and generally planning and
[29:26]
development is better when you look at the overall.
[29:28]
So they clustered the development as close as they could towards Saco Street to
[29:31]
preserve that 12 acres towards the back.
[29:34]
They're also proposing a small loop trail back there.
[29:38]
And then along with that,
[29:40]
given the extensive public benefit and improvements
[29:44]
of the Saco Street sidewalk, although it is a
[29:47]
general requirement for any development to provide pedestrian access,
[29:52]
we felt it was reasonable to include the efforts being made here where they
[29:55]
are sort of above a standard sort
[29:59]
of requirement and development, include that in with the open space given the
[30:03]
sidewalk is public recreation for the general public.
[30:07]
So those three elements together is what went to the
[30:11]
commission. The commission supported this, but did include a recommendation for
[30:15]
public access to the rear of the property.
[30:19]
Staff reviewed this afterwards and found that
[30:23]
where this parcel doesn't abut another public property,
[30:27]
an existing trail system, historically we've seen just some
[30:31]
conflict that can occur when public is walking through a private development
[30:35]
and the private development doesn't understand why they're there, they're not
[30:37]
there. So without some kind of a connection
[30:41]
to an existing system, staff would support this remaining a benefit for the
[30:45]
private development, and then the public benefit is that sidewalk along
[30:49]
Saco Street.
[30:53]
Also, I wanted to touch on the Saco Street sidewalk a bit.
[30:56]
This is a little confusing, so I'm going to try to explain it, and if you have any
[31:00]
questions, please jump in.
[31:03]
Oh,
[31:05]
I'm glad you have the building elevations.
[31:06]
I was hoping you could-
[31:07]
Yeah
[31:07]
... show those to the board as well again.
[31:10]
Some of the challenges facing with this, it's about 1,300 feet
[31:14]
of sidewalk from the Spiller Drive to the existing Elm
[31:18]
Maple where the existing infrastructure ends.
[31:21]
As part of this phase, Dustin created a sidewalk design, and that sidewalk
[31:25]
design identified several areas where there would need to be
[31:31]
easements on private property, either for grading or a couple feet of the
[31:35]
sidewalk in order to maintain the five-foot shoulder that is on
[31:39]
Saco Street. There could have been an option where the developer reduced
[31:43]
that five-foot shoulder, and everything was able to remain within the right of way.
[31:46]
However, staff find that shoulder is important for the use of
[31:50]
bicyclists and didn't support reducing that below five feet.
[31:54]
And so, that is what resulted in, there are two locations
[31:59]
where there would be right-of-way impacts.
[32:01]
So, that's how we got to this place of proposing
[32:05]
to phase the sidewalk installation.
[32:07]
The development is satisfying the pedestrian connectivity element
[32:11]
by extending the sidewalk towards Spiller and installing the
[32:14]
crosswalk to the existing sidewalk on the other side of Saco Street,
[32:18]
and also installing the curb all the way down to Elm Maple.
[32:22]
And the reason that's important is because once Saco Street pavement goes down,
[32:26]
there's a moratorium, and you can't disturb the pavement even to put curbing down.
[32:29]
So the curbing is down, which means the sidewalk can go in whenever it's ready.
[32:34]
With that, the city is going to take on the responsibility to work
[32:38]
with the individual private landowners and finalize
[32:42]
whatever needs to be made in order for this sidewalk to move forward,
[32:46]
where
[32:48]
we see a strong public benefit here, and an overall goal to extend
[32:52]
this sidewalk eventually down to the neighborhoods
[32:55]
towards the Scarborough's town line, The Hamlet.
[32:58]
So, the city has agreed to take that conversation on.
[33:02]
And then with that, the development would be required to actually
[33:06]
install the infrastructure and the sidewalk as part of their next phase of
[33:09]
development.
[33:11]
We found this to be a fair private-public partnership,
[33:15]
understanding that the actual request right now is just two
[33:19]
multifamily. We're not talking about the full build-out.
[33:21]
So for the two multifamily, we are achieving that pedestrian connectivity.
[33:25]
And then for the overall build-out, when that comes back, that's when the heavier
[33:29]
lift of the full sidewalk installation would
[33:32]
occur.
[33:34]
That's if you get the right of way, is that correct?
[33:37]
What if there's opposition for the right of way?
[33:41]
We'd have that conversation at that time.
[33:44]
I don't know, maybe there are other options.
[33:45]
Maybe there's an area where the sidewalk would be reduced in si-- I'm not really
[33:49]
sure what that conversation would be, but it seems like a conversation that
[33:53]
was more appropriate for the city to have with the individual landowners instead of
[33:56]
the developer.
[33:57]
Okay.
[33:58]
Thanks.
[33:59]
Mm-hmm.
[33:59]
I'd like to see what that update would be, for sure.
[34:02]
Putting the curb in, for one thing, is a plus-
[34:04]
Mm-hmm
[34:04]
... with the moratorium, because then it can be added on.
[34:07]
And with the phases, what type of timeframe are we
[34:11]
even talking about phasing on this?
[34:14]
Yeah. I think the goal is to do two buildings a year,
[34:18]
so we'd be back probably sometime,
[34:22]
maybe in the spring or over the winter to come back and talk about the next phase
[34:26]
of development.
[34:29]
So yeah, that's our intended schedule.
[34:31]
Okay. Thank you.
[34:35]
This is also a public comment area as well.
[34:37]
Does anybody from the public wish to speak on this project?
[34:43]
I see none. Anybody on Zoom?
[34:46]
I think that there's-
[34:50]
You want to come up? Yeah, come on up. State your name, your address.
[34:55]
You have three minutes to speak, so...
[34:58]
Got it.
[34:59]
My name is Kathy Gorham,
[35:01]
and we have lived at 521 Saco Street for
[35:06]
over 49 years.
[35:09]
When I was here at the previous meeting, I realized I'm in the older
[35:12]
generation here and got a little overwhelmed with what all was going
[35:16]
on. I have to say, I do appreciate some of the accommodations
[35:20]
that I heard about tonight. It would've been nice to have known about a little bit
[35:23]
more ahead of time, because that was part of what I would be
[35:27]
talking about. But, he's already addressing some of the
[35:32]
concerns that I had, and we had
[35:35]
before.
[35:37]
I know one part of when I was here before, that a big
[35:40]
concern about affordable housing, which I think everybody is concerned
[35:44]
about. I think Westbrook is doing more than their share in providing
[35:48]
it.
[35:50]
Our concern is that Saco Street's been the location
[35:53]
of single-family homes from the 1700s
[35:57]
up to recently built
[35:59]
new developments. And,
[36:05]
I have my notes here tonight. So, over the years,
[36:09]
various differences of intrusions have been allowed to
[36:13]
complicate it, kind of like the mix.
[36:14]
It's been residential, and then not residential, and then residential.
[36:22]
One concern that I know probably isn't even appropriate here is that that
[36:26]
farmhouse that got sold is going to be, I believe, some sort of a halfway
[36:30]
house, which would definitely have an impact on our neighborhood.
[36:33]
And that apparently doesn't come under any type of
[36:38]
logic that needs to come up into public
[36:43]
interest other than to us.
[36:46]
Now, the total, I believe, is 172, although we've heard
[36:49]
184 planned units out back.
[36:53]
I'm sure everybody can do the math and figure out there are going to be
[36:57]
Equal or more than those numbers of vehicles
[37:02]
entering and leaving Saco Street,
[37:05]
which should be renamed Saco Speedway, because
[37:09]
we've got a 45 speed limit out in front of our house, and believe me,
[37:13]
they go then and above all the time.
[37:17]
So then if you're going to have another 200 vehicles going on and off right
[37:21]
there,
[37:22]
that is going to be a problem for I think everybody who lives on Saco Street.
[37:30]
A lot of people have
[37:32]
built homes and bought homes in that area with the
[37:36]
idea that
[37:38]
they would have a long-term residence in a desirable area, and
[37:42]
I don't think this particular project is going to really
[37:46]
enhance that. It's not really going to be considered what
[37:50]
people bought into in a desired area at the time.
[37:53]
I realize it's late in the project and probably nothing anybody's going to do
[37:56]
about, but you need to understand that the people that live there,
[38:01]
it's a big deal.
[38:02]
It's a big deal to have that happening.
[38:05]
It seems like we've considered
[38:09]
housing, we've considered developers, but nobody seems to stop
[38:13]
and think about the people.
[38:16]
Am I up with my three minutes already?
[38:18]
Just keep it short-
[38:19]
Okay.
[38:19]
... and if you can, I'll allow you to still speak.
[38:22]
All right. Thank you.
[38:25]
I've lost my train of thought. It happens a lot.
[38:31]
Anyway,
[38:34]
I've lost my notes, but anyway. We
[38:38]
know that that place wasn't going to stay vacant.
[38:40]
It was a
[38:42]
farm for many years. We knew it wasn't going to stay vacant.
[38:45]
But we were hoping there'd be something more compatible with the neighborhood,
[38:49]
because it's a neighborhood. It's been there a long time and it's still a
[38:51]
neighborhood. A lot of families living there.
[38:54]
A lot of new homes have been approved to be built there.
[38:58]
And
[38:59]
we just are disappointed that hasn't been given more
[39:03]
consideration to those of us
[39:06]
that still live there. Probably will live there a little bit longer.
[39:10]
And
[39:12]
that's pretty much it. And I
[39:16]
just know from talking to my neighbors and myself having lived there for a long
[39:20]
time, that it's disappointing that that type of a
[39:24]
project is being allowed, and that would've been
[39:27]
a better way of approaching it.
[39:31]
Probably a done deal at this point, but just so you know.
[39:35]
Thank you.
[39:35]
Thank you, Kathy.
[39:38]
Anybody else?
[39:42]
Is there anybody through Zoom?
[39:45]
If there's anyone participating via Zoom and would like to speak, please raise your
[39:48]
hand.
[39:51]
I'm seeing none.
[39:53]
Okay. Thank you.
[39:57]
With that, I'm going to close the public comment, public hearing.
[40:01]
Dustin,
[40:02]
would you like to address a couple of these issues, maybe
[40:05]
affordability? I don't know how many might be
[40:09]
affordable part of the housing. Is there rumors of a halfway house with the
[40:13]
barn being taken down?
[40:15]
This is the first time hearing it, so.
[40:17]
Yeah.
[40:19]
And I know with traffic, its traffic concerns are
[40:22]
all over the place, and I know we're trying to, at the council
[40:26]
meeting last night, it was even mentioned more and more.
[40:29]
I know we don't have any control here with the speed
[40:33]
control on any of the streets in Westboro.
[40:36]
It gets out of control, and I don't think that anybody is
[40:39]
really taking the time to slow it down.
[40:43]
So, I understand your concerns with the speed limit at 60 mile an hour.
[40:46]
I see people do on Saco Street sometimes.
[40:50]
But yeah, maybe you can just address some of those concerns.
[40:55]
Yeah. As far as the
[40:58]
existing farmhouse, all I know is that the applicant,
[41:02]
they divided that off, and they did
[41:05]
donate it to his church.
[41:09]
So, that was a donation that was made.
[41:10]
And as far as what the church will use it for, I don't know.
[41:15]
But that's the limit of what I know about that.
[41:20]
And then, as far as the units themselves, I know
[41:26]
some of the neighbors, I
[41:28]
know they have a preference for
[41:31]
single-family development. And they had expressed
[41:35]
their desire that they would've preferred if this was like another L Maple
[41:39]
Drive or something like that, that kind of continued through and had all
[41:43]
single-family homes.
[41:46]
Certainly,
[41:48]
different options were kind of
[41:51]
considered a little bit here in the beginning.
[41:52]
I know this particular builder,
[41:55]
when they look to purchase properties throughout the city and do
[41:59]
development, the intent is to do these projects where
[42:03]
they build them and keep the properties and maintain them themselves
[42:07]
and create these rental units.
[42:11]
So, that wasn't something that they had purchased the property
[42:15]
with the intent of pursuing as a single-family type residential neighborhood.
[42:20]
That would be something where they would buy it and develop a bunch of lots and
[42:24]
sell them and then move on. Instead, this is one where they're looking to
[42:27]
make a long-term investment in Westboro and continue to maintain this
[42:31]
property. And they've got a lot of other nice properties
[42:35]
around the city where they've maintained them very nicely.
[42:38]
So, I
[42:40]
understand the skepticism going into this, and I'm hoping we can prove
[42:44]
everybody wrong, that this is a very nice addition to this neighborhood and it'll
[42:48]
complement what they've got going on as opposed to being something that
[42:52]
they look at and are disappointed in.
[42:53]
So,
[42:54]
I do think it is helpful to at least look at the buildings as well.
[42:58]
I know there's some developments around the city that maybe
[43:02]
folks look at and wish the buildings maybe were a little different, and I'm
[43:06]
hoping that this style of development with the
[43:09]
large pitch roofs, the half stories above,
[43:13]
this, I think, will fit in very nicely on this property and certainly
[43:17]
lends itself to that residential character
[43:21]
type of development. So,
[43:23]
I think this is
[43:27]
I think a nice, attractive looking building, and I think it'll fit well in the
[43:30]
area.
[43:36]
And how about the affordability standpoint?
[43:39]
I know with a development of this size,
[43:44]
with a percentage going to low income or more
[43:47]
affordable housing, is anything on
[43:50]
the proposal to give some marketable rates?
[43:53]
Or is it going to be all market rate rentals?
[43:58]
Yeah. There wasn't a plan, per se, to
[44:02]
designate a certain number of units as meeting the federal standards of
[44:05]
affordability and going through that whole HUD process of pre-qualifying
[44:09]
and all of that. I will say that this project incorporates
[44:14]
some one-bedroom units.
[44:16]
I think what we've heard from some people is that there's a lot
[44:20]
of folks out there that really only need a one-bedroom unit, and that's kind of the
[44:24]
price point that they'd like to be in.
[44:26]
But due to the lack of inventory, or maybe
[44:30]
they're only in buildings that only have one unit or are single-bedroom
[44:33]
units. For them to be able to be in a neighborhood like this
[44:37]
one with a one-bedroom unit that's a little bit more affordable, if that's all the
[44:41]
space that they need.
[44:43]
The entire third story of these buildings, they'll have
[44:47]
the four
[44:50]
single-bedroom units, which would be reduced rent compared to the two-bedroom
[44:54]
units. So it does introduce an affordable option
[44:58]
for folks that may not need the extra space, where they can still get into the same
[45:01]
neighborhood as somebody that's going to be paying the two-bedroom rate, but they
[45:05]
can be in at a lesser rate for the one bedroom.
[45:07]
Right. Thank you for that.
[45:10]
Do we have any other board comments?
[45:13]
Robin?
[45:16]
Thank you. I want to recognize all the work you did to move this around on the
[45:20]
site. I don't remember specifically, but I know it was much closer to the other
[45:23]
neighborhood, and I think it's a nice solution.
[45:27]
And I do think it's among the more attractive multi-family buildings for sort of a
[45:32]
big box that we've seen. It really is, around the city.
[45:35]
So I want to thank your applicant for that.
[45:38]
And because you know I can't resist,
[45:42]
so looking at the plans,
[45:45]
the way the entries work, they're actually on the sides is what I realize.
[45:48]
You walk
[45:50]
on the sidewalks, and the face that faces the parking
[45:54]
lot is kind of the back. And the entries, there's two
[45:58]
corridors, are the sides.
[46:01]
If you guys look at
[46:05]
GU-1. If you look at the plans and look at the site plan, you see that.
[46:08]
And what I want to point out on that is that the mechanical shed, which is the
[46:12]
utility shed, faces the parking lot, and it's the public side.
[46:15]
And it's private property. I
[46:19]
don't know if there's a design guideline that speaks against it, but I would
[46:22]
certainly recommend, because it's a really nice building, that you find a way to
[46:25]
put that. Just flip it so that's on the back.
[46:28]
It's probably for access for service.
[46:30]
It would mean adding a sidewalk, but it's a very
[46:34]
nice building, and you're going to drive in and see the mechanical shed.
[46:39]
Do you see what I mean? Those bays on the gable end, those are
[46:43]
actually the sides, not the front and back.
[46:48]
So the face of the building. I think there's another one.
[46:52]
Go to the elevations.
[46:56]
Go up one.
[46:58]
Yeah. These are the ones here.
[47:01]
Go up one. Do I have actual elevations in our... Oh, maybe you don't have them.
[47:03]
Oh, yeah. These are separate slides, so I didn't-
[47:06]
Yeah. It's two different-
[47:06]
I didn't bring the all four sides.
[47:08]
Okay.
[47:08]
But yeah.
[47:08]
Yeah.
[47:09]
Sorry.
[47:09]
If people look at their packets,
[47:11]
it's the west elevation as it's shown.
[47:14]
And again, it's never going to be the front elevation facing it, but it feels
[47:18]
like a shame for such a lovely
[47:21]
building. That's what I have to say.
[47:24]
Thank you, Robin.
[47:26]
I can echo on that, too. The building's not square.
[47:29]
They've not plain. They put
[47:33]
some architectural skill to it.
[47:35]
And I know it falls within city ordinances,
[47:39]
so we basically have to follow the city ordinances as far as
[47:43]
what is allowed to be put into a certain
[47:47]
area.
[47:49]
So
[47:50]
with that, we can't tell you to put in single families.
[47:53]
Yes, but I'd like to see more single family homes as well.
[47:56]
I know that they're almost unachievable now with the price range of where they're
[47:58]
at. So more and more people have to find rentable places, and trying to
[48:02]
get density into the city is
[48:06]
definitely a help to bring workforce and so forth in.
[48:09]
So with the design aspect of it and the phasing with the
[48:13]
sidewalks, I
[48:15]
can't see anything wrong with proceeding with this project.
[48:20]
Does anybody else have any other comments?
[48:23]
Karen?
[48:23]
Yeah. I just had a question. On here, and you said
[48:27]
they donated the property to the church.
[48:31]
Mm-hmm.
[48:31]
Is that zoned?
[48:34]
Would it be able to work as a church?
[48:36]
There's already a Calvary on Spring.
[48:41]
Because one of the plans shows Calvary
[48:45]
Church.
[48:46]
Calvary Church is the property owner, but the use of that church is actually still
[48:50]
being utilized as a residential structure, a single family structure.
[48:55]
It is
[48:57]
being used...
[48:59]
It does not meet the definition of a treatment facility that would require
[49:03]
any kind of approvals. I guess it is not part of
[49:07]
this
[49:08]
application, but where it came out, I can share.
[49:10]
I did reach out and I did speak to the church.
[49:12]
That specific church does run a
[49:16]
faith-based program where they meet with
[49:20]
people who are struggling with addiction.
[49:23]
And
[49:25]
they all live together and kind of learn the faith of that church.
[49:29]
It, again, does not meet the therapeutic threshold to be a treatment
[49:33]
facility because it is more this just faith-based
[49:37]
residential living.
[49:39]
But it is
[49:40]
being used as a residential facility.
[49:42]
So it doesn't need the medical component either?
[49:44]
No.
[49:45]
Okay.
[49:45]
There's no medication
[49:47]
Okay. I was just curious because I saw that and I-
[49:49]
Yep
[49:49]
... I'm just trying to get my bearings there.
[49:53]
So yeah, the buildings do look nice.
[49:56]
It is unfortunate with a property this size that we cannot seem to
[50:00]
utilize more single family. We're doing nothing to generate wealth or
[50:03]
generational wealth. We're just a rental town, and that's
[50:07]
what's unfortunate.
[50:09]
But these do look more like homes and not-
[50:14]
... boxes. You didn't allude to any price point on a one-bedroom or two-bedroom.
[50:17]
I know that's probably really far out to kind of dictate that, but market
[50:21]
rent right now, ballpark?
[50:25]
Yeah. Yeah. I'm honestly not sure where they're going to be at with the twos and
[50:29]
the ones.
[50:30]
When they're done, it'll be prevailing rates at that point.
[50:34]
Right. Okay. Thank you.
[50:37]
Thank you, Robin. Yes, Ariana.
[50:40]
Justin, I'm saying this to you because we see you so often here.
[50:43]
Respectfully, saying that a one-bedroom apartment is going to be cheaper than a
[50:47]
two-bedroom apartment is not affordable housing.
[50:50]
I hear what you're saying about offering a mix of different size units for people
[50:53]
who have a lot of different needs. I completely appreciate that, but I
[50:57]
expect that these one bedrooms will be at least $2,000 a month for rent, and that's
[51:01]
simply not affordable.
[51:04]
And that's okay.
[51:06]
This doesn't have to be affordable housing because we need a mix of housing for
[51:10]
people at all income levels, but I just want to say that for the board
[51:13]
and for the future.
[51:16]
And I just had a question. I really appreciate the thought that was put into the
[51:19]
sidewalk project, and I think that's a great
[51:23]
use of the public space requirement.
[51:25]
But can you just elaborate on the conflicts that have come up when there is
[51:29]
access to a trail that's within a subdivision?
[51:33]
The only place that I'm familiar with this is on RE Drive, where there's two public
[51:36]
parking spots for the trail up there, and I was just thinking, why not have two
[51:40]
parking spots for this trail per the Parks Commission's recommendation,
[51:44]
but would defer to the city's... If you could just elaborate on
[51:48]
what the problems have been other than
[51:50]
people who live there don't like seeing somebody they don't know walk through their
[51:54]
driveway, which to me is like,
[51:57]
I'm not too worried about that.
[51:59]
Well, that is part of the problem-
[52:02]
... is that I think,
[52:06]
to be fair, less so in a rental
[52:09]
complex because it's being
[52:12]
governed as one, and so it's a lot harder
[52:15]
if somebody... Like if it were an L Maple, just for example, this did
[52:19]
not occur there, but I'm just using it as an example, where a developer came in and
[52:23]
they built the road and the individual lots, and then other folks came in and
[52:26]
bought them. So the people who are living there didn't realize maybe that there
[52:30]
was a public access easement on their property when they bought it, and then that
[52:33]
can become a strong point of conflict.
[52:35]
And then we get lots of calls about that, and then people get frustrated when we
[52:38]
can't do anything, and so it ends up just being a conflict.
[52:42]
Mm-hmm.
[52:43]
In this one, the RE Drive is a good example,
[52:47]
and I'll touch on this later, but it doesn't
[52:51]
end up getting utilized that much because people don't know it's there.
[52:55]
And then once people don't know it's there and it's not being utilized,
[53:00]
the fact that it's there gets forgotten by everybody, and it does end up being
[53:04]
something that is on everyone's mind at the moment of approval and then kind of
[53:07]
falls off the table.
[53:08]
Mm-hmm.
[53:09]
So where there's a situation where if there were an existing trail along
[53:13]
the back, I think that that would make sense to continue it, but where the entire
[53:15]
trail is and then the existence of entering the property, doing the loop, and going
[53:19]
out, that's where it didn't seem
[53:22]
like it made sense in this instance.
[53:24]
Okay. That makes sense to me, too, but thanks for explaining it for future
[53:27]
projects.
[53:27]
Mm-hmm.
[53:29]
Lucas.
[53:30]
I'm just curious, Dustin, do you know if the donated parcel,
[53:34]
the oversight of that, will be given to the same entity
[53:38]
that runs the sober living parcel abutting the
[53:42]
property?
[53:46]
So, the ownership of
[53:50]
the farmhouse? So the one that's already been conveyed off, are you talking about
[53:54]
the other two lots that are being created? Yeah.
[53:56]
You'd mentioned the part had been donated and just wondering if it's connected to
[53:59]
the abutter.
[54:01]
No. So,
[54:03]
the one that's already been conveyed,
[54:08]
the intent is not for either of these two lots that are being
[54:12]
created to also be managed by that same
[54:16]
owner.
[54:16]
Okay.
[54:18]
Yeah, there's no intent there.
[54:19]
Mm-hmm.
[54:20]
I think there'll be, again, a residential duplex constructed on one of the lots,
[54:24]
and then that existing barn building,
[54:28]
I think
[54:29]
in the beginning might just be used for storage during construction and everything.
[54:33]
They might keep some of their maintenance equipment in there and stuff like that.
[54:38]
Okay. Yeah, just clarifying because it sounded like the two components had been
[54:41]
conflated in the previous abutter comment.
[54:45]
Thank you.
[54:48]
Anybody else?
[54:51]
Jason.
[54:53]
Thank you, Mr. Chair.
[54:57]
Just curious about if there's been traffic counts done out there for
[55:00]
Saco Street?
[55:03]
So we didn't do site-specific traffic counts to generate
[55:07]
what the background traffic is going down Saco.
[55:10]
We did trip generation calculations just for this project,
[55:15]
but didn't necessarily
[55:18]
analyze the whole corridor.
[55:21]
Okay.
[55:22]
With the
[55:24]
amount of units, does it require a traffic study?
[55:27]
No?
[55:28]
Not that I'm aware of, no.
[55:30]
No.
[55:31]
All right. Okay.
[55:33]
Design.
[55:35]
I really like the design. I think it looks really nice.
[55:38]
But I agree, the mechanical shed
[55:42]
should not be the front. That's the first thing you see.
[55:48]
Looking at this
[55:50]
and those pictures there, if you rotated building A 180
[55:54]
degrees, put the shed in the back, and then building B rotated it 90 degrees
[55:58]
clockwise, it would look like Kind of like that up there.
[56:01]
It'll look like two different buildings, but it's the same building.
[56:04]
And, it would hide the sheds.
[56:07]
But,
[56:09]
nice design.
[56:11]
Parking lot.
[56:13]
That is a lot of asphalt.
[56:17]
I mean,
[56:21]
it is what it is. But
[56:25]
if there's any chance to soften this up a bit,
[56:30]
that would be
[56:32]
definitely beneficial.
[56:35]
Because that is a big parking lot
[56:37]
coming into the entrance.
[56:40]
One of the things we did is
[56:42]
we narrowed up the driveway entrance coming in.
[56:45]
One of the things, by moving the development further back into the lot and
[56:49]
not having parking up in that first few hundred feet, we're
[56:53]
able to go with a narrower-
[56:55]
Mm-hmm
[56:55]
... driveway section up until the point where we have to do 90-degree
[56:59]
parking. At that point, we need to provide enough space so you're not backing into
[57:02]
vehicles and causing damage. So we tried to keep it neck
[57:06]
down for as long as we could, and then eventually we kind of got to the spots where
[57:10]
we had to have parking, so then we had to widen it up at that point.
[57:20]
Yeah. Is there any discussion about putting a fence between the
[57:24]
farmhouse and
[57:27]
Building A?
[57:29]
I assume that's the farmhouse, the
[57:33]
kind of like the S-
[57:34]
Yeah
[57:34]
... kind of like that L-shaped one there.
[57:36]
Yeah. In that case there,
[57:42]
that's already a big building. It's probably as
[57:45]
tall as these new buildings that are going
[57:49]
in.
[57:51]
So it didn't look like something where something on the ground per
[57:55]
se would
[57:56]
do much for the buildings, because of kind of how close they are and
[58:00]
the fact that all of the buildings are pretty large.
[58:03]
So we looked at, basically, we also
[58:07]
have some drainage that runs in between,
[58:10]
kind of around the backside of the farmhouse heading towards the garage.
[58:13]
It kind of breaks in two directions there.
[58:17]
So there's a few things going on there where just trying to create a physical
[58:20]
barrier there didn't make a lot of sense to us.
[58:23]
Certainly going forward, if the church feels like a fence
[58:27]
is required, we kind of have a strip in between-
[58:29]
Mm-hmm
[58:30]
... the church property and the retained land, this
[58:34]
Lot 3, where that
[58:36]
single-family house lot kind of, it's like an L shape there.
[58:42]
So I think doing a fence along that line too, we'd have to kind of figure out kind
[58:45]
of where it would go. But certainly opportunity to do one, but at this point-
[58:50]
Okay
[58:50]
... I don't know that it's needed.
[58:52]
Right. Yeah, and it
[58:54]
sounds like
[58:55]
it was owned by the developer.
[58:58]
Yes.
[58:58]
Yeah, so.
[58:59]
Correct.
[59:00]
Kind of up to them. So.
[59:01]
Yeah.
[59:01]
All right. Well, thanks.
[59:04]
Thank you, Jason. Anybody else?
[59:07]
Go ahead, Rebecca.
[59:08]
If the board's all finished with their comments, I don't mind if I could say
[59:11]
something quickly.
[59:11]
Yeah, go ahead.
[59:12]
Yep. I just wanted to speak to Kathy for a minute
[59:16]
and acknowledge the
[59:19]
concern you're feeling about the feeling of the multifamily next to the single
[59:23]
family, and that that can feel very jarring when it hasn't been
[59:27]
built yet. And it will be different.
[59:28]
We cannot deny that having development next will be...
[59:31]
Some of the previous iterations of this did include more duplex style,
[59:35]
but the trade-off to that was then it went all the way to the back, and so you were
[59:37]
clearing all the way in the back.
[59:40]
So there's the benefits of this kind of being clustered
[59:44]
up front, maintaining the back as a vegetated wild area versus
[59:47]
clearing in the back and losing that habitat.
[59:51]
There's also topographical challenges in this particular parcel that lent
[59:55]
its way to this development.
[59:58]
But I wanted to
[1:00:01]
let you know that the board, I was going to remind the board of this later, so I'm
[1:00:05]
just going to remind you now. But the board's going to be holding a
[1:00:07]
post-construction site walk, specifically to take a look at a couple
[1:00:10]
developments that show the integration of multifamily and single-family
[1:00:14]
homes. Because one thing that I think a lot of people don't realize is that
[1:00:18]
we are very much a mixed housing type
[1:00:22]
city, really. We have a mix of single family, duplexes, triplexes,
[1:00:26]
multis, all over the place. And I think a lot of times people don't see
[1:00:30]
them because once they're built, they really nestle in and they just settle out.
[1:00:34]
One of the sites we're going to be visiting actually is the same developer
[1:00:39]
and has a similar building style that might, if you are
[1:00:42]
interested, you may enjoy coming and seeing.
[1:00:45]
If you are interested in that, please reach out to the planning department and we
[1:00:49]
can let you know the information of that, what time, where to
[1:00:52]
meet. We're going to be visiting three different sites and just meeting at
[1:00:56]
one and kind of going on to the next one whenever we're finished at the one.
[1:00:59]
But it could be an opportunity for you to just sort of see that
[1:01:03]
integration once it's constructed.
[1:01:07]
Do you want to say anything?
[1:01:09]
No.
[1:01:11]
Yes. Come on up.
[1:01:13]
For me?
[1:01:14]
You have to come to the microphone.
[1:01:14]
You have to come on up to the microphone.
[1:01:16]
Oh, sorry.
[1:01:16]
Sorry. They can't hear you on record.
[1:01:20]
I think my main concern is more with the numbers.
[1:01:23]
The numbers of
[1:01:25]
units, and the number of cars that are going to be there, and
[1:01:29]
the access, and the diagram. I mean, I am not
[1:01:32]
100% single family homes, if there were
[1:01:35]
duplexes or something like that. It's just the sheer
[1:01:39]
numbers of what is going to be in there.
[1:01:43]
And, well, 172, but we've also seen something that
[1:01:47]
referred to 184 units going in there.
[1:01:51]
And I've seen that on some paperwork.
[1:01:55]
Thank you for saying that again. I had that down.
[1:01:56]
It's not 184, it's 84. So
[1:02:00]
there's seven 12 unit buildings, so the
[1:02:04]
full build out, the full master plan is 84.
[1:02:06]
Yeah, 84. I'm sorry. Yeah.
[1:02:07]
No, that's okay. I just wanted to-
[1:02:07]
I'm sorry.
[1:02:08]
Yep.
[1:02:08]
But it's just the sheer numbers of
[1:02:11]
People and vehicles, and where are you gonna
[1:02:15]
park all the vehicles? People are gonna live there.
[1:02:17]
A lot of people are gonna live there. There are gonna be people in and out.
[1:02:20]
They're gonna have company. You're gonna have deliveries.
[1:02:23]
And I don't think any of us really
[1:02:27]
expected that it was gonna be all single-family homes.
[1:02:30]
It just wasn't realistic at this point in
[1:02:33]
time. So-
[1:02:35]
We have parking ordinances, so each
[1:02:38]
building that has to be maintained in the city, no matter what it is,
[1:02:42]
whether it's a house, whether it's an apartment, whether it's a duplex, has to
[1:02:46]
have the standard amount of parking spots per
[1:02:50]
unit. So any time there's a unit being built, whether it's a
[1:02:53]
multifamily, they have to abide by the city code of
[1:02:57]
ordinances, the amount of parking to be able to
[1:03:01]
handle the amount of units that are gonna be developed.
[1:03:04]
So you're not gonna have any overflow on Saco Street as far as that goes.
[1:03:07]
Okay.
[1:03:07]
If there needs to be more parking, if
[1:03:12]
the development gets bigger,
[1:03:14]
normally we can add additional parking for visitors.
[1:03:17]
And usually, the developer will do that.
[1:03:20]
So we're not gonna have any parking on Saco Street per se.
[1:03:23]
There's gonna be plenty of room for the residents to park within their-
[1:03:27]
Okay
[1:03:27]
... complex without any...
[1:03:29]
This parking lot's pretty big as it is, what we see on both sides.
[1:03:33]
So there's definitely enough. It's 1.75 parking spots
[1:03:37]
per unit, and that's plenty sufficient, what we've seen
[1:03:41]
for any other application in the city. So.
[1:03:44]
And then the other, of course, the main concern was traffic in and out, which
[1:03:48]
now that you've got a new road coming in off the
[1:03:52]
back end of Idex. We have another driveway coming in
[1:03:56]
across the street from that. It just
[1:03:58]
gets crazy. So.
[1:03:59]
Mm-hmm.
[1:04:00]
Thank you.
[1:04:00]
I understand your concern. Thank you.
[1:04:05]
With that, we do have a-
[1:04:07]
Mr. Chair?
[1:04:07]
Go ahead, John.
[1:04:08]
Just because it's come up again, through you to the planner,
[1:04:14]
Saco Street's a state road, and we can't control that. Is that how that works?
[1:04:18]
When it comes to speed limits, that's a state issue?
[1:04:22]
It is a state-designated speed limit, yes.
[1:04:25]
All right. And
[1:04:28]
is that ever affected by the amount of
[1:04:32]
maybe curb cuts or cars entering it?
[1:04:35]
For example, the creation of 24 units doesn't require a traffic study, but
[1:04:39]
that's theoretically. Twenty-four more entries and exits onto a road,
[1:04:43]
does that ever factor into speed limit designations as far as you
[1:04:46]
know?
[1:04:47]
It does not. Speed limit factors into the location
[1:04:51]
of curb cuts and entrances in order to determine that there's an adequate sight
[1:04:55]
distance-
[1:04:55]
Sight distance
[1:04:55]
... in that speed, right. But the entrance itself wouldn't affect the speed of the
[1:04:59]
road.
[1:04:59]
Okay. Thank you.
[1:05:02]
Good question, John.
[1:05:05]
With that, I have a motion on page 10 of our memo.
[1:05:15]
Anybody entertain? John?
[1:05:16]
Mr. Chair, I move that the planning board approve the site plan
[1:05:20]
subdivision application for MTR Development LLC
[1:05:24]
to subdivide parcel previously addressed as 547 Saco
[1:05:28]
Street into three separate lots, and the construction of an 800-foot driveway
[1:05:32]
to provide access to the development of two 12-unit multifamily
[1:05:36]
buildings on Lot 3, Tax Map 4, Lot 13, Zoned
[1:05:40]
Residential Growth Area 2. Approval includes the following findings of fact,
[1:05:44]
conclusions, and conditions as stated on pages 10 through 15 of the
[1:05:48]
staff memo dated July 31st, 2026, which are adopted in
[1:05:52]
support of this approval.
[1:05:53]
Thank you. Can I have a second, please?
[1:05:56]
Second.
[1:05:58]
Thank you, Robin.
[1:05:59]
Can I have a roll call vote, please?
[1:06:05]
Robin Tannenbaum? Yes.
[1:06:08]
Nancy Litercapes?
[1:06:10]
Yes.
[1:06:12]
Jason Frazier?
[1:06:13]
Yes.
[1:06:14]
Karen Axelson? Yes.
[1:06:17]
Kevin Price?
[1:06:18]
Yes.
[1:06:19]
Lucas Shrake?
[1:06:20]
Yes.
[1:06:21]
Oriana Farnham?
[1:06:22]
Yes.
[1:06:24]
John Turcotte?
[1:06:25]
Yes.
[1:06:26]
And Larry McWilliams.
[1:06:27]
Yes. Seeing unanimous. Thank you, Dustin, for that presentation.
[1:06:32]
Thank you.
[1:06:33]
I also need now a motion to go into workshop, please.
[1:06:38]
So moved, Mr. Chair.
[1:06:39]
Thank you, Nancy.
[1:06:40]
Second.
[1:06:41]
Thanks, Kevin. Can I get another roll call vote, Jenna, please?
[1:06:48]
Robin Tannenbaum? Yes. Nancy Litercapes?
[1:06:53]
Yes.
[1:06:54]
Jason Frazier?
[1:06:55]
Yes.
[1:06:56]
Karen Axelson? Yes. Kevin Price?
[1:06:58]
Yes.
[1:06:59]
Lucas Shrake?
[1:07:00]
Yes.
[1:07:01]
Oriana Farnham?
[1:07:01]
Yes.
[1:07:03]
John Turcotte?
[1:07:04]
Yes.
[1:07:04]
And Larry McWilliams.
[1:07:05]
Yes. Thank you. With that, Orlando, can you read the next
[1:07:09]
item into the record, please?
[1:07:12]
Item number 26-000635, Site
[1:07:16]
Plan 100 Larabee Road, 100 Larabee LLC.
[1:07:19]
The applicant is requesting an expansion to provide 34 additional parking
[1:07:23]
spaces to the Larabee complex. Tax Map 042B,
[1:07:27]
Lot 006, Zone Gateway Commercial, Use Retail,
[1:07:31]
Restaurant Class 2.
[1:07:34]
Thank you. With that, applicant presentation, please.
[1:07:38]
Good evening, members of the board.
[1:07:39]
My name's Henry Hess, Spiga Technics, representing the applicant tonight at
[1:07:43]
Larabee Road. And I'm just gonna pull up my presentation
[1:07:47]
here.
[1:07:58]
So before the board, as stated, is a parking
[1:08:02]
expansion at 100 Larabee Road,
[1:08:04]
proposed parking expansion. To orient you briefly,
[1:08:09]
the site centered in the picture here, Larabee Road
[1:08:13]
running
[1:08:14]
to the south of the site here, or Page South,
[1:08:17]
Main Street to the right side, and Terminal Street
[1:08:21]
to the left
[1:08:23]
It's a large building
[1:08:26]
with a separate building as well adjacent to it, multi-tenant
[1:08:30]
commercial style building.
[1:08:34]
If I go to the next page here.
[1:08:43]
There we go.
[1:08:48]
Here it goes.
[1:08:51]
Too far.
[1:08:53]
Exists today.
[1:08:55]
Like I said, just briefly wanted to show existing conditions that were out there,
[1:09:00]
and then
[1:09:02]
if we could just get this to...
[1:09:06]
What's being proposed is approximately 33 parking
[1:09:10]
spaces
[1:09:11]
expanded at this site. There's currently
[1:09:15]
333.
[1:09:19]
The shift itself,
[1:09:22]
or the addition itself is majority in that western corner of the
[1:09:26]
parcel along Terminal Street.
[1:09:29]
In order to find that additional parking, a lot of it entails shifting
[1:09:33]
that driveway entrance to the west.
[1:09:36]
That provides
[1:09:38]
adequate space for a long row of parking, and then
[1:09:41]
expanding the interior parking and providing
[1:09:45]
parking islands in the center as well.
[1:09:49]
There are a number of spots dotted
[1:09:53]
throughout the site beyond that, about five
[1:09:56]
on the left side of Larabee Road, one on the right
[1:10:01]
side of Larabee Road,
[1:10:03]
and then a few to the rear back right where we
[1:10:07]
have proposed some one-way directional access.
[1:10:12]
A lot of the parking, the reason that one-way directional access is proposed, a lot
[1:10:15]
of the parking that comes through there and the access is one-way parking.
[1:10:20]
And right now, the way a lot of the tenants use the
[1:10:24]
site, a lot of drop-off happens to the rear
[1:10:28]
for some of the tenants at specific times,
[1:10:31]
and that circulation just helps keep some of the cars a little bit more organized
[1:10:35]
in there as opposed to a lot of crisscross traffic as people drop off, either
[1:10:40]
people attending either events to the rear or going into
[1:10:44]
the uses into the rear as well.
[1:10:47]
So the site itself is proposing minimal expansion
[1:10:51]
of impervious, albeit there is an expansion of about 6,000 square
[1:10:55]
feet
[1:10:56]
for these parking spaces. As such,
[1:11:00]
the project's proposing in two locations there, close to Terminal
[1:11:04]
Street,
[1:11:06]
one on the west, one on the east side there.
[1:11:08]
Two smaller detention or
[1:11:12]
stormwater basins there to detain and meet the flooding standards of the city.
[1:11:18]
A lot of the site water today
[1:11:22]
either runs into existing storm drainage and into a
[1:11:26]
swell around Terminal Street and actually flows to another area
[1:11:30]
of treatment offsite, or as well as there's an existing filterra
[1:11:34]
system along Terminal Street that does currently treat a
[1:11:38]
section of that pavement as well
[1:11:40]
before outletting again to that swale that runs along Terminal Street.
[1:11:47]
The reason this parking expansion is proposed is
[1:11:51]
the owner of the lot has had
[1:11:54]
a number of new leases with new tenants that require additional parking.
[1:11:58]
They've seen a lot of
[1:12:01]
well, full parking lots for their tenants recently and they're trying to,
[1:12:05]
with increased programming that those tenants have, go into the evening and
[1:12:09]
nighttime demands. There's kind of a new overlap in the
[1:12:13]
parking that's been happening there, and they're seeing a lot of congestion and
[1:12:17]
tenants that really need some additional parking there to suit their needs.
[1:12:23]
So that's why we're here before you at this workshop.
[1:12:26]
Part of this proposal and the expansion of impervious area
[1:12:31]
does mean that there's a slight reduction in the percentage of the total
[1:12:35]
or overall landscape area for the site.
[1:12:37]
I know the Gateway District, there's a 25% requirement.
[1:12:41]
Existing today, this site has 14%.
[1:12:45]
It's a larger commercial site with
[1:12:49]
a fair amount of paving. With the expansion, it'd be down
[1:12:53]
to 12%.
[1:12:55]
So again, a slight reduction there.
[1:12:57]
There will be a few trees impacted as such, about four or five trees
[1:13:01]
impacted for the expansion, and as part of the site plan that comes forward,
[1:13:05]
you'd see those trees replaced and some additional landscaping there
[1:13:08]
where feasible and to provide some buffering.
[1:13:12]
So I guess with that, I can turn my time back over to the
[1:13:16]
board and answer any questions you may have.
[1:13:18]
Certainly, I know Rebecca might have a little information as well,
[1:13:22]
but I'm here for the board for any questions.
[1:13:26]
Thank you very much.
[1:13:28]
Rebecca?
[1:13:30]
Yeah, so as Henry stated, there is a reduction in
[1:13:34]
the landscape on this site. Typically, that's not something that would be allowed.
[1:13:38]
It's already non-conforming. You're not typically allowed to increase the
[1:13:40]
non-conformity. However, in the Gateway Commercial District, it expressly states
[1:13:44]
that this can be something that the board approves if it's found that there's no
[1:13:47]
other reasonable alternative. There is a fee in lieu that would be
[1:13:51]
associated with that. We use the same calculation as we do for our open space
[1:13:55]
in determining that, and that funds
[1:13:59]
are then required to be utilized within the Main Street
[1:14:03]
corridor for safety or beautification improvements.
[1:14:07]
So Henry has been made aware of this.
[1:14:09]
We need to get the finalized number, but just running off of those basic
[1:14:12]
percentages, it's about a reduction of 6,000 square feet, which would be a fee
[1:14:16]
in lieu of about $13,071.
[1:14:22]
And the only other staff comment here is that we kind of spoke
[1:14:25]
to it briefly in the memo, but we'll need to continue to work with the applicant in
[1:14:29]
identifying how that one-way maneuver is going to
[1:14:33]
function. It looks functional on paper.
[1:14:37]
However, in reality, that's pavement on the other side, so
[1:14:41]
it's going pavement to pavement. There's no delineation of that one way, so there's
[1:14:44]
nothing that's really forcing a vehicle to follow that.
[1:14:47]
So, we may need to explore options of seeing, does this need to be in one way,
[1:14:51]
or if it does, is there a way to delineate it or provide something in addition to
[1:14:55]
pavement markings to encourage compliance.
[1:15:03]
That's all.
[1:15:03]
Okay. Thank you.
[1:15:06]
Any board comments?
[1:15:09]
Through you to the planner. I've never seen this before where the staff memo
[1:15:12]
indicates that some of the proposed parking are not approved.
[1:15:16]
So what happens if we approve... I realize we're not up to that, but if
[1:15:20]
it gets to the point of approval and we approve something that the fire marshal
[1:15:23]
doesn't allow, except for that part, it would continue
[1:15:27]
forward?
[1:15:27]
Well, the staff memo are recommendations, really, to the board, but it is letting
[1:15:31]
you know that FD does not support it, and we do generally
[1:15:35]
follow FD's guidance for safety measures.
[1:15:38]
There was a concern of access at that particular location.
[1:15:41]
Right.
[1:15:41]
So it would be-
[1:15:41]
It's right there in front of the entrance.
[1:15:42]
Yep, it would be FD's recommendation to not have those located
[1:15:46]
there.
[1:15:46]
You know what? I appreciate that comment, too.
[1:15:48]
It's something I didn't get a chance to, I overlooked mentioning in a
[1:15:52]
quick presentation there. It's something that we've spoken to the applicant.
[1:15:56]
That's understandable. We've heard that comment from the fire department loud and
[1:15:59]
clear.
[1:15:59]
Okay.
[1:15:59]
So, any formal site plan that came forward at that point would
[1:16:03]
be following the fire marshal or fire recommendations.
[1:16:07]
Thank you.
[1:16:10]
Mr. Chair?
[1:16:11]
Yes, Kevin.
[1:16:12]
Just a quick comment. As someone who's cut it a little close on dropping
[1:16:16]
off a daughter at a dance here, I agree, this lot needs some work- ...
[1:16:19]
because you have people leaving and coming at the same time.
[1:16:22]
Yeah.
[1:16:22]
Circulation is a challenge.
[1:16:23]
Yeah.
[1:16:23]
Youth, kids, it's been more than once of like, "Nope, you can't run in.
[1:16:26]
Stop"-
[1:16:27]
Yep
[1:16:27]
... car. So, glad to see that with this, there's some thinking about that and kind
[1:16:31]
of the unique use of that building. So that's all.
[1:16:37]
Anybody else?
[1:16:40]
Yes, Jason.
[1:16:42]
Thank you, Mr. Chair.
[1:16:43]
So, I assume this is the dance place there, or
[1:16:47]
is this, what's causing the-
[1:16:49]
The applicant before you is the
[1:16:53]
owner of the lot, not necessarily the-
[1:16:55]
Okay
[1:16:55]
... owner or the tenant of the dance studio.
[1:16:58]
So which business or businesses are causing-
[1:17:03]
Oh, yeah.
[1:17:03]
The-
[1:17:03]
To answer your question, yes, I believe some of that congestion, yes, in the
[1:17:06]
evening programming from the dance studio, et cetera. Yes, absolutely.
[1:17:09]
Okay. So I drive by here all the time, and
[1:17:12]
along Larabee,
[1:17:14]
it seems like it's always empty. It doesn't seem like there's ever anybody there.
[1:17:18]
On the front, yeah.
[1:17:19]
Not on the Larabee side. Which, yeah, you have to walk around the building.
[1:17:24]
Mm-hmm.
[1:17:26]
Any thought... I'd be okay if you got rid of those parking spaces along
[1:17:30]
Larabee and then added those ones, kind of swap it,
[1:17:34]
put in some trees in the front there, some nice landscaping,
[1:17:37]
beautify the building, add more parking in the back.
[1:17:40]
Yeah.
[1:17:43]
Just an option.
[1:17:45]
Thank you, Jason. And you know it's me with landscaping as well.
[1:17:48]
The nice thing with something like this, I've never saw this where we were adding
[1:17:52]
more parking spots either as well. I don't think it's ever come up.
[1:17:57]
But the fact that in lieu of that, that we do have a plan in
[1:18:01]
place, because I already mentioned, I already put it down, an increased
[1:18:04]
plantings somewhere else in the city.
[1:18:06]
If you can't put them here to upgrade to somewhere to
[1:18:09]
beautification. You've mentioned beautification and
[1:18:13]
safety. What is that about?
[1:18:17]
So there isn't a specific project that that would be applied to right now.
[1:18:20]
That's just the standard in the ordinance is that
[1:18:23]
it would be required to...
[1:18:27]
Because a certain fund.
[1:18:27]
Safety and appearance improvements
[1:18:30]
is the general terminology for the use of the funds.
[1:18:34]
Okay. I would
[1:18:36]
suggest on something like this,
[1:18:39]
because of the plantings, to use it in a planting of somewhere
[1:18:43]
else in the...
[1:18:44]
The flower fund.
[1:18:46]
Yeah, call it the flower fund, or a tree fund-
[1:18:49]
Tree fund
[1:18:49]
...
[1:18:50]
or something to that where we can add, like when we have trees that do
[1:18:54]
die in the city, that I know we do a lot of plantings along the roads, along
[1:18:58]
wayside, and they're looking good. Obviously, sometimes they do die.
[1:19:02]
We have to replace them at a cost. So, some type of fund where
[1:19:06]
we can use that money to replace the trees or
[1:19:10]
do some extra landscaping. I know that Row 4 does it.
[1:19:13]
I know in the middle, where they are, at the McDonald's
[1:19:17]
intersection, they put the landscaping projects right
[1:19:21]
in the middle of the roadway. So, I'd be up to seeing something where that money
[1:19:25]
would go directly into a landscaping project versus
[1:19:29]
just in a general appearance fund.
[1:19:32]
Because I know where some monies go, sometimes it gets
[1:19:35]
allocated in a different way or a different place, and that's where I was curious.
[1:19:40]
I would certainly, if we can't do landscaping here, I would certainly encourage it
[1:19:43]
to be somewhere else in the city. So, my
[1:19:47]
two cents on that.
[1:19:47]
Mm-hmm.
[1:19:49]
Anybody else?
[1:19:49]
Just one last point.
[1:19:52]
What I've experienced, I didn't experience the dance
[1:19:56]
studio. I experienced Jokers used to be back there, and
[1:19:59]
people just rocketing straight through from Amato's, and I like how you have
[1:20:03]
this turn here where they're kind of required to turn into the lane furthest away
[1:20:07]
from the building. Will there be signage telling people that that's where they got
[1:20:10]
to go?
[1:20:10]
Yeah. The intent, and I believe it was also mentioned at staff comment,
[1:20:14]
is at this scale, we didn't include specific locations of signage,
[1:20:18]
but the intent would absolutely be signed appropriately and to deter
[1:20:22]
... those going two-way. It is two-way
[1:20:25]
traffic to some of the comments between
[1:20:29]
there, the two buildings until you get to the rear and the property line
[1:20:33]
extends upward.
[1:20:35]
And that creates that pinch point, right?
[1:20:37]
The intent would be really from that point, you get your one-way because you're
[1:20:41]
right. There's traffic
[1:20:43]
for the adjacent parcel and this parcel.
[1:20:46]
One is 90, one is one-way. They both use a wide
[1:20:50]
piece of pavement there, and when you actually get towards that rear and you round
[1:20:53]
the corner there, that is the intent of you're not supposed to be coming out that
[1:20:57]
way.
[1:20:57]
Right.
[1:20:57]
This is in only this direction. Yep.
[1:20:59]
Thank you.
[1:21:03]
Thank you, John. Anybody else?
[1:21:08]
I see none. With that, can I get a motion, please?
[1:21:11]
This is in workshop.
[1:21:12]
Oh, it's a workshop. I don't need a motion.
[1:21:15]
Well, thank you for that.
[1:21:18]
So with that, this is also for a public comment.
[1:21:22]
I didn't give the public an opportunity to speak on this, but if there's
[1:21:26]
anybody through the public that's in the audience would like to speak on the
[1:21:30]
addition of parking spaces,
[1:21:32]
please come up. I see none. Anybody through Zoom?
[1:21:36]
If there's anyone participating via Zoom and would like to speak, please raise your
[1:21:39]
hand.
[1:21:42]
Seeing none.
[1:21:43]
Okay. Thank you.
[1:21:45]
All right. Well, thank you very much.
[1:21:47]
Thank you for your time and consideration of the project.
[1:21:49]
Thanks. Have a good night.
[1:21:50]
You, too.
[1:21:51]
Okay, Orlando, can you read the next item into the record, please?
[1:21:57]
Item number 26-000630,
[1:22:00]
site plan subdivision 267 Conant Street, MGM Builders,
[1:22:04]
Inc. The applicant is requesting to construct three multifamily residential
[1:22:08]
buildings totaling in 36 dwelling units, and to establish a pad
[1:22:12]
site for a future development of a 4,000 square foot commercial building.
[1:22:16]
Tax Map 031, Lot 033, Zoned City
[1:22:20]
Center, Use Dwelling, Multiple Family.
[1:22:24]
Thank you.
[1:22:26]
And I see Dustin's up at the microphone again. Hi, Dustin.
[1:22:29]
Here again. So
[1:22:32]
, all right.
[1:22:36]
So Dustin Roma again with DM Roma Consulting Engineers,
[1:22:39]
representing MGM Builders with this application.
[1:22:43]
So for those of you that were on the board five or six years
[1:22:47]
ago, this project was presented at
[1:22:51]
length to the planning board or a project on this
[1:22:54]
property that is somewhat similar to what we're proposing here.
[1:22:59]
At the time, we had worked through the development of plans for
[1:23:03]
a exclusively commercial development.
[1:23:06]
It had multiple individual smaller buildings.
[1:23:11]
And it never went all the way through to final approval.
[1:23:14]
We basically
[1:23:16]
had run into a scheduling conflict with a upcoming
[1:23:20]
paving moratorium, and we really weren't able to proceed into a
[1:23:24]
final plan approval. So this applicant has still
[1:23:27]
retained ownership of the property, and it's basically just kind of sat for
[1:23:32]
four or five years now. In that time, they've kind of
[1:23:35]
reconsidered the use of the property and worked
[1:23:39]
through some development options.
[1:23:41]
And what we have in front of you here as a proposal is a
[1:23:44]
predominantly residential-use development with
[1:23:48]
a mixed-use component for a 4,000 square foot
[1:23:53]
commercial building that we're showing along the front of the site.
[1:23:57]
At this time, we have no intended tenant for that 4,000-foot
[1:24:01]
building. It's really being designed as a pad site.
[1:24:04]
Certainly,
[1:24:06]
we will need to make some accommodations for it so that we can discuss things like
[1:24:10]
parking and traffic and wastewater disposal.
[1:24:12]
All of those things, we're going to have to make some guidelines and
[1:24:15]
assumptions as to maybe what might go into that building.
[1:24:19]
But right now, we're just basically showing it as a pad site.
[1:24:24]
One of the nice things about that building being there as well, we've got
[1:24:28]
basically two kind of prominent buildings that will be up
[1:24:32]
near Conant Street. So we'll have this commercial building as well
[1:24:36]
as one of the multifamily buildings that'll really be what
[1:24:40]
you see as you drive by the site or as you pull in.
[1:24:44]
And really, all the parking is going to be in the back.
[1:24:46]
So you'll just have this driveway entrance coming in,
[1:24:50]
and the primary visibility of what you'll see are the buildings.
[1:24:56]
We will be extending the sidewalk along Conant Street,
[1:25:00]
heading to the east,
[1:25:02]
and ending at the
[1:25:04]
condo project that's adjacent to us.
[1:25:07]
What's not shown on this plan is that the sidewalk that
[1:25:12]
from the west has been extended up to that
[1:25:15]
driveway that is basically adjacent to our
[1:25:19]
property.
[1:25:20]
That development that occurred, the 17-unit development there that was
[1:25:24]
built within the last two years,
[1:25:27]
that project, it did extend the sidewalk up the road.
[1:25:30]
So now we're going to continue to kind of integrate this
[1:25:33]
connectivity of sidewalks as we go up through Conant Street.
[1:25:41]
We've got the building designs are still being worked on.
[1:25:45]
As you can see from this layout, they're more of a rectangular shape building
[1:25:49]
as opposed to a square. So it'll be potentially something that's
[1:25:53]
a little different than what you've seen a lot of.
[1:25:56]
We've got integrated sidewalks throughout the development.
[1:26:00]
And then certainly the number of parking spaces will take into
[1:26:03]
account that mixed-use component with the commercial piece as
[1:26:07]
well.
[1:26:09]
This development has a single dumpster location all
[1:26:13]
the way in the back of the site.
[1:26:15]
We've identified certainly a desire to have a second dumpster
[1:26:19]
location. That certainly is kind of far away from some of the units, and with the
[1:26:23]
number of units being proposed here, we think maybe a second location would
[1:26:26]
also function pretty well here. So we will
[1:26:30]
be perhaps rearranging some of the site a little bit to
[1:26:34]
accommodate a second, more central dumpster pad area.
[1:26:46]
Yeah, we'll be bringing sewer into the site from Conant Street.
[1:26:49]
There we do have an existing gravity main that's there across
[1:26:53]
the street.
[1:26:56]
And then
[1:26:58]
with the number of units here, we will take a look at
[1:27:02]
traffic and just the traffic that's being generated from the project.
[1:27:06]
Just again, make sure we're not triggering any warrants for things like left
[1:27:09]
turns and those sort of things. So we'll take a look at that in detail,
[1:27:14]
just to make sure that the traffic functions will adequate or will function
[1:27:17]
adequately.
[1:27:19]
For lighting, we will likely have some pole-mounted lighting on this
[1:27:23]
project. It's not shown on this plan, but we anticipate some of
[1:27:27]
these landscape islands that we have around the site, as well as around the
[1:27:31]
perimeter. We do have some parking areas that are located not immediately adjacent
[1:27:34]
to the building, so we do anticipate some pole-mounted lighting.
[1:27:39]
We'll have
[1:27:40]
landscaping put together from a landscape architect.
[1:27:44]
And we'll have some nice building elevations for you to look at as well and
[1:27:48]
comment on when we come back in with our full plan.
[1:27:55]
So this is more of an introduction again, to kind of just get
[1:27:59]
everybody back familiar with this project again.
[1:28:03]
We're going to use a lot of the stormwater and
[1:28:06]
utility kind of design components that we had previously.
[1:28:10]
But the site layout has changed a fair amount, so some of
[1:28:14]
that'll be reworked.
[1:28:17]
And we'll also run some multiple turning templates through the
[1:28:21]
site just to kind of demonstrate how...
[1:28:23]
Because we have a bunch of little dead-end areas on
[1:28:27]
this site, which a big looped configuration I think would be
[1:28:31]
better, but we're also, again, trying to leave some green space on this
[1:28:34]
property and not just continue on with
[1:28:38]
further
[1:28:40]
parking areas in the back. And trying to leave some of these landscaped
[1:28:43]
islands in between all the parking areas to try to introduce some green space.
[1:28:47]
So,
[1:28:48]
it is kind of a balance to just have continuous loops
[1:28:52]
all through the site as opposed to these kind of dead-end
[1:28:56]
parking areas that
[1:28:59]
end up resulting in
[1:29:02]
having the right number of parking spaces, but maybe not having as much drive
[1:29:06]
aisles.
[1:29:08]
Looking at that kind of double-stacked parking lot that's there as well, could be
[1:29:12]
an opportunity maybe to kind of push those buildings back a little bit on the rear,
[1:29:16]
maybe create some landscape in between that parking area so it's not just one
[1:29:20]
big massive parking in between the commercial
[1:29:23]
building and to the rear of that. So again, there's some
[1:29:27]
opportunities there that we'll continue to tweak this plan before we come back and
[1:29:31]
have it in front of you again for review.
[1:29:34]
But again, we thought this was a good opportunity to bring it back up.
[1:29:37]
If you have any comments or suggestions, we'd love to hear them tonight.
[1:29:41]
And we'll certainly take those into account as we further develop these plans.
[1:29:45]
So, thank you.
[1:29:47]
Thank you.
[1:29:48]
Becca?
[1:29:50]
Nothing further to add specific to the development.
[1:29:53]
I'm looking forward to see this return.
[1:29:56]
But I did just want to point out to the board, the plans that you received in your
[1:29:59]
packet and was showing tonight, it does show that this is a split-zone parcel.
[1:30:02]
This is not a split-zone parcel. There was an exercise that this board went through
[1:30:06]
a couple of years ago where we looked at some of the split-zone parcels,
[1:30:09]
specifically within the city center district, to try to have the
[1:30:14]
zone district align with the parcel lines, and this was one of the ones that was
[1:30:18]
addressed. So, this is actually entirely within the city center district.
[1:30:22]
It's no longer split-zoned.
[1:30:24]
Thanks for that comment.
[1:30:27]
I was going to bring that up, but I remember doing that on this one
[1:30:30]
as well. So,
[1:30:34]
with that, this is a public hearing or a public comment section.
[1:30:37]
Does anybody from the public wish to speak on this project?
[1:30:42]
I'm seeing none. Anybody through Zoom?
[1:30:46]
If there's anyone participating via Zoom and would like to speak, please raise your
[1:30:49]
hand.
[1:30:52]
I'm seeing none.
[1:30:53]
Okay. Thank you.
[1:30:54]
With that, can we have any board comments on this project?
[1:31:00]
Robin. Hi.
[1:31:01]
Hi. Thanks. I think this is a really good use of this parcel.
[1:31:07]
It's a tough one, let me zoom out, to lay out.
[1:31:10]
But I find you talked about that heavy parking area to the
[1:31:14]
right. It's very not residential.
[1:31:18]
And I just wonder what other options they can...
[1:31:20]
The buildings,
[1:31:22]
even in the previous project that we were talking about with the two buildings
[1:31:25]
together, they had relationship to each other, and these don't.
[1:31:28]
And I see some of the challenges, but I wonder, the two
[1:31:31]
opposite each other, if the one at the bottom could be
[1:31:35]
paired, essentially, with the top right one and the parking moved aside.
[1:31:39]
They're
[1:31:40]
so disparate.
[1:31:43]
And I would think that for the lower building, half of it looks out at
[1:31:47]
a potential commercial site. I just wonder if there's more work that can be done to
[1:31:51]
separate the residential component from the commercial component.
[1:31:57]
I don't know how
[1:31:58]
you get to do that with trace paper.
[1:32:02]
Just to make it feel residential.
[1:32:05]
I like what you said about possibly moving the buildings back, more landscaping.
[1:32:08]
It looks like whatever concept there is, it will also be this.
[1:32:11]
And I get it. You actually go around,
[1:32:14]
the part that faces the parking spots is not the front, it's sort of
[1:32:18]
the side. And that has to do with building design and how many entries there
[1:32:22]
are, instead of one big central entry. That's fine.
[1:32:24]
But I think there's opportunities there.
[1:32:26]
And I also would just think
[1:32:29]
for that lower building,
[1:32:31]
most of the parking is over to the side.
[1:32:33]
So,
[1:32:34]
I think there's
[1:32:36]
more design work to do there to really
[1:32:39]
differentiate those two areas. I also noticed, but then I saw it in the
[1:32:43]
comments that the handicap spots aren't equally distributed.
[1:32:46]
But I know you're
[1:32:47]
You haven't gotten to that level of detail.
[1:32:48]
So, I think it's a nice use of it, and I'd like to
[1:32:52]
see it have a stronger delineation of uses.
[1:32:56]
Thanks.
[1:33:00]
Anybody else?
[1:33:02]
Nancy?
[1:33:02]
Yeah.
[1:33:03]
I have a question in terms of the commercial building.
[1:33:07]
What
[1:33:08]
would be the front of that? Is it the parking lot side
[1:33:12]
or is it Conan Street?
[1:33:15]
Yeah.
[1:33:16]
So we haven't really laid that out yet.
[1:33:18]
I would anticipate that we could have
[1:33:23]
an entrance on there where we have the sidewalk out there.
[1:33:25]
We could potentially have an entrance that comes in the front of that building.
[1:33:30]
But the
[1:33:31]
idea was that the entry point for customers, employees, things
[1:33:35]
like that, would be from the back,
[1:33:38]
and that we would just create almost a
[1:33:41]
Main Street type look on the front.
[1:33:43]
So you'd have a street side view,
[1:33:46]
almost like a Main Street type look on the roadside, and then leaving
[1:33:50]
ample space there between the building and the road for landscaping.
[1:33:53]
So we've got that
[1:33:55]
wide green space in there that, in this plan, it looks like it's all
[1:33:59]
lawn, but it would all be nicely landscaped in front of the building.
[1:34:03]
It might be a good idea to consider a bike rack
[1:34:06]
out front of that too, because it's city center and
[1:34:10]
it would be bikeable.
[1:34:13]
Agreed.
[1:34:17]
Mr. Chair?
[1:34:18]
John.
[1:34:18]
Just echoing what Robin and Nancy said, that
[1:34:22]
I believe we have to have businesses who face the road that at least look
[1:34:26]
like the front of the building. Is there something-
[1:34:29]
Not at this location.
[1:34:30]
Not at this location.
[1:34:30]
No.
[1:34:30]
Okay. Because it never really works.
[1:34:33]
Everyone tries to make it work, and it never quite works.
[1:34:35]
But as long as it, like you said,
[1:34:38]
you make an effort at that look, and there will be some landscaping between.
[1:34:42]
Because the alternative, of course, is to have the parking facing the street, which
[1:34:45]
this is going to be much better as you drive by.
[1:34:47]
You're going to see the buildings, and the parking's behind it.
[1:34:51]
I feel you're going to run yourself in circles with the tracing paper trying to
[1:34:54]
rotate these buildings and move them back, but see what you can do.
[1:34:58]
I don't have a problem with the
[1:35:02]
placement of the buildings, and I can see that you're limited on
[1:35:06]
where you can put them. So I'll be just interested to see how you're able to play
[1:35:10]
with that. But other than that, I do like, as I said before, how as
[1:35:14]
you drive by, you're going to see the buildings and the parking's going to be
[1:35:16]
behind that. I think that's going to be a good look from Conan Street. Thank you.
[1:35:21]
Thank you, John. Anybody else? Yes, Jason.
[1:35:25]
Thank you, Mr. Chair.
[1:35:26]
So I do remember this site. It's where that huge red
[1:35:30]
house used to be that was torn down.
[1:35:32]
Yeah.
[1:35:32]
I always wondered what happened to that project.
[1:35:33]
So
[1:35:35]
here we go.
[1:35:36]
I agree with others. Your parking lot definitely needs a little feng shui or
[1:35:39]
something.
[1:35:40]
It needs some help, but the only thing really
[1:35:45]
I think here is the single family over to the end, the home over to the
[1:35:49]
left side there. I guess give them just a little breathing room.
[1:35:53]
Yep.
[1:35:53]
And I'm sure they'd appreciate that, so.
[1:35:56]
But
[1:35:57]
yeah.
[1:36:01]
Looking forward to seeing the next revision.
[1:36:03]
Thanks, Jason. Oriana?
[1:36:05]
I'm curious who owns the land behind it down to the
[1:36:09]
river, if any of that connects to the
[1:36:13]
city-owned land along the river that I think is intended to be developed
[1:36:17]
as a more formal trail out that way.
[1:36:20]
Just, if there's any chance of connecting back there to the trail.
[1:36:24]
I know we've got private ownership in between this lot and
[1:36:28]
maybe what might be city land further back.
[1:36:31]
Okay.
[1:36:31]
There's one,
[1:36:33]
the landowner that owns the strip of land between this
[1:36:36]
project and,
[1:36:40]
I forget what the condos are. They're called, is it Gateway or ...
[1:36:43]
But yeah, the condo project that's here.
[1:36:44]
There's a strip of land that comes up, and then merges in with a larger parcel in
[1:36:48]
the back that's really just for a single family home.
[1:36:52]
That's primarily in the rural zone.
[1:36:56]
And then,
[1:36:59]
yeah, it's privately owned around the perimeter, I know.
[1:37:02]
So we don't directly abut any of that city-owned land, but...
[1:37:05]
It's quite a bit away from where the-
[1:37:07]
Yeah
[1:37:08]
... city land was. But there are two large parcels in there,
[1:37:12]
and kind of looping back to our conversation earlier, I think if a
[1:37:15]
project were to happen on either of those, I'm not saying it will, it's private
[1:37:19]
property, but if it were, that would be an instance where I think there may be a
[1:37:22]
benefit for a public easement on the back for eventual continuation of the trail.
[1:37:26]
But we're quite a bit away at the moment.
[1:37:28]
Yeah. And is there a sidewalk all the way to Conan Street from there?
[1:37:33]
No.
[1:37:34]
Basically, this would be
[1:37:36]
the end of it, so we're just kind of continuing it on.
[1:37:39]
Okay. I was just thinking about what are the open space
[1:37:43]
opportunities, because it is close enough that you would want to walk into town,
[1:37:46]
but it's not really good walking infrastructure, but not much you can do about
[1:37:50]
that.
[1:37:51]
Just...
[1:37:59]
Anybody else?
[1:38:05]
I see none. I'll just say that it is a good
[1:38:08]
location to have a mixed use
[1:38:11]
coming in. I like the buildings in the back, that you're not going to see
[1:38:15]
the driveways as well once you're in. It's going to be a roadway.
[1:38:19]
I'm assuming with all the landscape architect, you're not going to see much of
[1:38:22]
anything
[1:38:23]
through those back buildings with the front scape.
[1:38:28]
The islands, are they going to be landscaped as well?
[1:38:30]
Or is that going to be-
[1:38:31]
Definitely.
[1:38:31]
Is that going to be okay?
[1:38:33]
Yeah, I'm looking forward to see you moving on with this project for sure.
[1:38:37]
The only thing I can say is, with that other building that is on the left, with
[1:38:41]
the parking, I don't know if that can be,
[1:38:45]
even if it's beneficial to put that residential building back to the
[1:38:49]
right and move the commercial pad To the other side
[1:38:53]
and move the driveway over a little bit more towards where that pad is.
[1:38:57]
I don't know if that makes any sense.
[1:38:58]
That way it keeps all the residentials in one section of the
[1:39:02]
parcel-
[1:39:03]
Mm-hmm
[1:39:03]
... and then your commercial lot up in the front.
[1:39:06]
Yeah, and I think rezoning the property the way the city did
[1:39:10]
potentially opens up some doors here, because the way we understood it
[1:39:14]
previously, with this being a split zone, and you can see how the zone line was
[1:39:17]
running through those multi-buildings.
[1:39:18]
Right.
[1:39:19]
Our understanding was that the multifamily use was
[1:39:23]
not permitted in that rural zoning district, which was behind it, so the
[1:39:27]
physical placement of the buildings had to be up in that city center zone.
[1:39:30]
So we pushed them as far back as we felt we could while still maintaining
[1:39:34]
that zone boundary, because I think we could extend 30 feet into
[1:39:37]
the more restrictive zone. So that's kind of how we ended up
[1:39:41]
with this building placement. But knowing now that, and Rebecca had mentioned
[1:39:45]
that to me previously, that now that we have open city center zoning
[1:39:49]
across the whole property,
[1:39:52]
there's opportunity now to continue to move these buildings back that wasn't there
[1:39:55]
when we were here five years ago.
[1:39:56]
Mm-hmm.
[1:39:57]
So.
[1:40:00]
Well, then I'm looking forward to seeing the new design.
[1:40:04]
Yep.
[1:40:05]
Because you got your work cut out for that one, too, before your next one.
[1:40:07]
Yeah, it'll be a nice project. Yeah.
[1:40:08]
Oh, yeah.
[1:40:08]
I'm looking forward to it.
[1:40:12]
Anybody else?
[1:40:13]
No, sir.
[1:40:14]
All right. Well, thank you very much, Dustin.
[1:40:16]
Thank you.
[1:40:19]
Orlando, could you read the next item into record, please?
[1:40:24]
Yes.
[1:40:26]
Item number 26-000636,
[1:40:30]
Subdivision 108 Longfellow Street
[1:40:33]
108 LLC.
[1:40:37]
The applicant is requesting a three-lot subdivision to create one lot
[1:40:41]
for the construction of a single-family dwelling, establish a separate
[1:40:45]
lot for the existing three-unit multifamily building, and
[1:40:49]
retaining one existing lot with which no development is currently proposed.
[1:40:53]
Tax Map 027, Lot 001, Zone Residential Growth
[1:40:57]
Area 1, Use Dwelling, Single Family, Multiple Family.
[1:41:02]
Thank you. Dustin.
[1:41:03]
All right. Good evening. This is my last one for the evenings.
[1:41:08]
So Dustin Roma, DM Roma Consulting Engineers, representing the
[1:41:12]
applicant here for 108 Longfellow Street.
[1:41:14]
Dustin, can you try to speak up a little bit so that the-
[1:41:16]
Yes.
[1:41:16]
Yep. Thank you.
[1:41:17]
Yep.
[1:41:20]
Yeah, so this project
[1:41:23]
is, at this stage, it's a fairly
[1:41:27]
straightforward application where
[1:41:30]
we're really not proposing any physical development of this property as
[1:41:34]
part of this subdivision request.
[1:41:36]
There's an existing driveway with a shared parking area
[1:41:40]
for a three-unit building on this property.
[1:41:43]
It's 1.7 acres in total.
[1:41:46]
This landowner who purchased the
[1:41:49]
property
[1:41:51]
is looking to essentially just divide it up into three lots,
[1:41:56]
and kind of create the canvas for somebody to come in and
[1:41:59]
propose some sort of development on this lot.
[1:42:02]
So,
[1:42:04]
we've got
[1:42:06]
a lot created around the three-family with a
[1:42:10]
parking area.
[1:42:12]
That lot will utilize the existing driveway that's
[1:42:15]
there to be shared with lot three, so that
[1:42:19]
easement will be retained on that property for access to that
[1:42:22]
three-family building.
[1:42:24]
We thought it was best to have that easement be owned
[1:42:28]
in fee from the future owner of lot three,
[1:42:32]
seeing that there will most likely be improvements made to
[1:42:36]
that driveway entrance to accommodate whatever development somebody
[1:42:40]
may want to do on lot three. Under current zoning,
[1:42:45]
we've estimated that nine units could potentially be put on
[1:42:48]
lot three. Whether somebody physically wants to do that or whether they want to
[1:42:52]
do something else would be up to them.
[1:42:56]
And
[1:42:58]
so again, we thought it was best to just have the ownership of that
[1:43:02]
access way come in, stay with lot three, so that if they're going to be making
[1:43:05]
improvements to it, that they would not be working within somebody else's easement,
[1:43:09]
but they'd be working on their own land.
[1:43:11]
And just making sure that that three-family would
[1:43:15]
continue to have access over
[1:43:17]
the current road as it exists, as well as an improved road if that was something
[1:43:21]
that was done in the future.
[1:43:24]
Lot number one has a very tight
[1:43:28]
building envelope down in that lower area.
[1:43:31]
It's been designed so it has
[1:43:35]
enough square footage in there to accommodate a single family home, but nothing
[1:43:39]
more than that.
[1:43:42]
You can see that it's kind of hatched in on the plan here.
[1:43:44]
There's a fairly steep slope that drops down into that
[1:43:48]
lot
[1:43:50]
from the three-family side. So it's fairly level at the three-family.
[1:43:55]
And then where this property line is drawn in is basically right at the top of the
[1:43:58]
bank, and then it kind of slopes down, and there's a bunch of trees along that edge
[1:44:01]
there. And then
[1:44:04]
so we've identified a
[1:44:07]
fairly small building envelope on that lot,
[1:44:10]
but something that could be accommodated.
[1:44:13]
We are in the process right now of just putting together a basic grading
[1:44:17]
plan that we're really just using, that the owner will be able to use for
[1:44:21]
marketing purposes and stuff, just to kind of show what could potentially go on
[1:44:25]
that lot.
[1:44:26]
Certainly, any development of really any of these lots,
[1:44:30]
other than the three-family home lot, so lots one or three,
[1:44:35]
if anything were proposed to be built on there, it would require going
[1:44:39]
through preparing a drainage and grading
[1:44:42]
plan that would get reviewed by engineering here at the
[1:44:46]
city as part of a building permit review process.
[1:44:49]
So there is that level of review that will occur.
[1:44:53]
But we do kind of want to just get out ahead of it a little bit and make sure we
[1:44:57]
show any prospective buyers what our ideas are for
[1:45:01]
how that lot number one would be developed,
[1:45:05]
to kind of create a building envelope there.
[1:45:08]
Lot number three is kind of wide open.
[1:45:11]
If somebody wanted to do a few units or single-family
[1:45:14]
house or whatever they wanted to do, that would be up to them.
[1:45:17]
And you would see that plan back in front of you if somebody were to
[1:45:21]
develop lot three in any manner other than a single-family home, I think that you
[1:45:25]
guys would see that again.
[1:45:26]
Yeah, anything to a three.
[1:45:27]
Yeah.
[1:45:28]
Three or more.
[1:45:28]
Yeah. So you guys would see that as an amendment or as a site plan review.
[1:45:37]
So yeah. So other than that's really all we're proposing
[1:45:41]
at this time. So, we had a neighborhood meeting.
[1:45:45]
They had some questions and unfortunately it was a similar situation to this where
[1:45:48]
it's normally we're proposing to build something and they're asking,
[1:45:51]
how much of this is gonna get cut back and how much vegetation is being
[1:45:55]
removed, and
[1:45:57]
the answers that we've been giving people is essentially, if this is approved to
[1:46:01]
split this up into three lots, all we're gonna do is basically put
[1:46:05]
for sale signs out front and that's the limit of what we're gonna do with this
[1:46:08]
project for now.
[1:46:11]
So certainly if there's anything that you see here that you'd like us to
[1:46:15]
incorporate, we are gonna try and get this turned back around for a full
[1:46:18]
application here, hopefully for the meeting coming up
[1:46:22]
in September. So I think we'd have to get stuff submitted for
[1:46:26]
Thursday, so any feedback you can provide would be greatly appreciated
[1:46:30]
so we're prepared for this next submission. So thank you.
[1:46:33]
Thank you.
[1:46:35]
Rebecca?
[1:46:36]
Nothing further.
[1:46:37]
Okay. Thank you. With that this is also a public
[1:46:41]
comment section. Anybody who wishes to speak on this project, please
[1:46:45]
step up to the microphone. You do have three minutes.
[1:46:48]
I'm sorry Larry, one thing. I did just wanted to let...
[1:46:50]
We did receive too about our notice that our, but our emails today, those
[1:46:54]
were provided to the board.
[1:46:57]
I just wanted to state for the record that they are a part of the overall record.
[1:47:01]
Thank you.
[1:47:02]
Sorry about that.
[1:47:02]
And I did get an opportunity to read those as well, and we
[1:47:06]
will bring those up into comments with the questions after
[1:47:11]
people in-house and through Zoom speak.
[1:47:13]
So with that, come on up sir.
[1:47:18]
Hi, my name is Larry.
[1:47:20]
My father owns the building at 80 Longfellow Street,
[1:47:24]
and we just wanted to draw to your guys' attention, in case,
[1:47:28]
there's been a lot of history as far as that back
[1:47:32]
road, kind of right to the side of that huge slope.
[1:47:36]
We've had to spend a lot of money over the years on
[1:47:40]
drainage. Last year we had to spend a ton of money on drainage
[1:47:44]
because that whole back road really started
[1:47:48]
to deteriorate over the years, mainly because of the water that would come down
[1:47:51]
that slope. So his main concern and ours
[1:47:55]
was just that maybe some sort of drainage
[1:47:59]
solution there would be one, maybe that doesn't put so much
[1:48:02]
strain on our system.
[1:48:06]
Also how close it is is a concern,
[1:48:10]
because of the drainage also.
[1:48:13]
Like you said, it does seem to be like a small little
[1:48:17]
area there.
[1:48:19]
Not only is he concerned about it being
[1:48:23]
so small
[1:48:26]
next to the slope, but he's also concerned it's an historical building.
[1:48:30]
He just wanted to make sure preserve.
[1:48:34]
If you're just gonna squeeze a single building in there, just
[1:48:38]
because you can, it seems unfortunate to ruin such a
[1:48:42]
nice looking building right next to it, potentially.
[1:48:45]
But mainly, it sounds like
[1:48:49]
the location of these buildings is his concern,
[1:48:53]
specifically where they might be and how the drainage would work
[1:48:57]
getting
[1:48:59]
down that slope,
[1:49:00]
because we're basically downhill from everything up
[1:49:04]
there.
[1:49:06]
They've
[1:49:08]
developed kind of offsite in other places
[1:49:12]
where the water sometimes... The area is really,
[1:49:16]
there's a lot of water in that area.
[1:49:20]
So, we have pools of water on other parts of
[1:49:24]
our property because developments have kind of
[1:49:28]
pushed water down a hill on the other side of the property.
[1:49:30]
So I think we're just concerned that that sort of thing might happen
[1:49:34]
on the other side. So,
[1:49:37]
I don't know if he had anything to add.
[1:49:41]
No. Well, actually,
[1:49:43]
we have got that property-
[1:49:46]
Can you-
[1:49:46]
... on all three sides.
[1:49:46]
Yeah, come on up. Give us your name and your address.
[1:49:48]
I'm Marshall Mack. I'm the owner of Mack Brothers.
[1:49:52]
We have a 90-unit early housing project that's on the
[1:49:56]
property around
[1:49:58]
108 Longfellow Street. And
[1:50:02]
that our back road there was actually the canal
[1:50:06]
that goes around and it's a high water table, the whole
[1:50:10]
area down below. So it's a concern to
[1:50:15]
how that's gonna play out if there's construction there.
[1:50:19]
And I can visualize in that little area a
[1:50:23]
house being there, but
[1:50:25]
that's not
[1:50:28]
something for me to decide. Also I suppose
[1:50:33]
the back part of it too,
[1:50:36]
we as a slope, but nothing like that one.
[1:50:39]
But we got a
[1:50:41]
single
[1:50:43]
apartment building on one floor that's on a slab,
[1:50:47]
and we have a drainage going around there too and I
[1:50:51]
don't know
[1:50:53]
how they're going to address more water coming down there
[1:50:57]
on that part of it. But as far as
[1:51:02]
Area three, I don't have a problem with that.
[1:51:07]
It's the back part of maybe area three, but area one
[1:51:11]
especially is a problem
[1:51:14]
for us. So,
[1:51:16]
that needs to be addressed.
[1:51:18]
But,
[1:51:19]
so that's all I want to say.
[1:51:22]
All right.
[1:51:23]
Thank you.
[1:51:24]
Thank you.
[1:51:26]
Could I clarify, Larry, is your last name Mack as well?
[1:51:29]
Yes.
[1:51:30]
Okay.
[1:51:30]
Yes.
[1:51:31]
I can hear a little bit better maybe. I think is the main thing.
[1:51:35]
Thank you.
[1:51:39]
Okay. Does anybody else from the public wish to speak?
[1:51:43]
Seeing none, anybody through Zoom, Orlando?
[1:51:47]
If there's anyone participating via Zoom and would like to speak, please raise your
[1:51:51]
hand.
[1:51:53]
I am seeing none.
[1:51:54]
Okay. With that, I'll close the public comment.
[1:51:59]
With that, do we have staff comment?
[1:52:04]
So-
[1:52:04]
Ms. Russ, please.
[1:52:04]
Yeah, well, it is a challenging thing because as Dustin said, he's
[1:52:08]
not proposing any development right now.
[1:52:11]
So this at this point really is just the land division.
[1:52:14]
Any kind of, the drainage design would be part
[1:52:18]
of any kind of development on these, but we don't have those
[1:52:22]
items now. The lot one, that would go through the process
[1:52:26]
called a surface drainage plan, which is something that's required to be reviewed,
[1:52:30]
where they do look at groundwater, and
[1:52:34]
where, essentially, whenever a new lot is created, that
[1:52:38]
lot legally needs to continue to accept the water.
[1:52:41]
It's always accepted, and it can't expel water onto a different property that it
[1:52:45]
didn't previously.
[1:52:47]
The existing paths of water have to be maintained.
[1:52:50]
So that's what the surface drainage plan would be looking at, that grading of that
[1:52:54]
lot before they could go forward to a building permit.
[1:52:57]
I do not disagree that the lot one that's being shown has a
[1:53:01]
very small building envelope between the slopes and then the
[1:53:06]
setbacks from the property lines that are being created, but it does
[1:53:10]
meet the requirements of the ordinance for a lot.
[1:53:13]
And then, as Dustin said, lot three would likely be some kind of a
[1:53:17]
site plan that would come back to this board and the grading and drainage would be
[1:53:21]
designed at that time.
[1:53:24]
Thank you, Becca.
[1:53:26]
With that, do we have any other board comments? Oriana?
[1:53:29]
Becca, just so I can learn, where nothing is being proposed to
[1:53:34]
be built right now, aside from the lots meeting the minimum
[1:53:38]
standards for the zoning district that they're in, is there
[1:53:41]
anything that the board... Like, there are no discretionary factors for us
[1:53:45]
to... Are there any discretionary factors- ...
[1:53:48]
that we would evaluate to disapprove this
[1:53:52]
subdivision?
[1:53:53]
Not typically. The only thing that kind of flagged for me that I do wanna run by
[1:53:57]
afterwards is making sure that there's a location for a driveway that would be
[1:54:01]
feasible on that lot one.
[1:54:03]
Because, there have been instances where people have created lots that were not
[1:54:07]
board approved, they just carved off a lot, and then come to find out that lot
[1:54:10]
doesn't meet the standards for a driveway. That could be a problem.
[1:54:13]
But essentially, it is just a review of the lot dimensions, yes.
[1:54:16]
Yeah, okay. I note that it is the minimum
[1:54:20]
size, but it can be for fronted 65 feet
[1:54:24]
across.
[1:54:25]
And depth.
[1:54:26]
Yeah.
[1:54:27]
So it meets the criteria to the T.
[1:54:31]
Thank you, Oriana. Anybody else?
[1:54:33]
All right, Mr. Chair.
[1:54:34]
John?
[1:54:34]
So I actually live on Turner Street, and I've actually been to this
[1:54:38]
building, and that that is a steep slope.
[1:54:40]
Yes.
[1:54:40]
So but that's not before us today. That's for someone who's gonna have to go
[1:54:44]
through to get a building permit.
[1:54:46]
And it would need a curb cut as well, wouldn't it?
[1:54:49]
Yep, that was the driveway point that I'm kind of flagging to double check.
[1:54:52]
Yeah, well, that's-
[1:54:52]
I think it will be fine because what the entrance to the property next door is
[1:54:56]
like a private access entrance. It's not a street, but with the slope where
[1:55:01]
it is, those driveways would have to be pretty close to each other.
[1:55:03]
So I wanna run that by the city engineer.
[1:55:05]
Sure. Okay. All right. Other than that, I mean, that, as we've
[1:55:09]
all said, and Oriana underscored, we're just splitting it up into three legal
[1:55:12]
lots, so
[1:55:14]
I think that's where we're at.
[1:55:17]
Yes, thank you. And with a lot one with a single family,
[1:55:21]
it's not coming back to the board because we only
[1:55:24]
see items that have a multi-family.
[1:55:27]
So if there's three or more buildings proposed on any lot,
[1:55:32]
that's when it comes to the board approval.
[1:55:34]
If it's a single family lot, like this one, the one that's
[1:55:38]
mostly concerned
[1:55:40]
with the residents here, is gonna be directly going through
[1:55:45]
the city, through code enforcement, through the whole
[1:55:48]
application process. If it gets sold off,
[1:55:52]
then the city actually will take responsibility to make
[1:55:56]
sure that the water will not run off onto other
[1:55:59]
parcels of property. When we have a multi-structure,
[1:56:03]
we make sure that we put in places certain drainage issues
[1:56:07]
on any multi, and
[1:56:10]
it's being taken care of. So there's no extra runoff.
[1:56:14]
Anything that I've seen in the last seven years with any of the projects that does
[1:56:18]
come through with my understanding is, we
[1:56:22]
follow up on all this, and if there is extra water, the builder
[1:56:26]
is responsible to taking care of that.
[1:56:27]
So it's gonna be
[1:56:30]
something that will be addressed when it comes time to build.
[1:56:34]
And if it does get sold, I don't know, does that just go directly to...
[1:56:38]
The abutters won't have any
[1:56:40]
say if a single building goes into play there. Was that correct?
[1:56:45]
Notices are sent out to direct abutters for a building permit
[1:56:48]
issuance, but it's a notification.
[1:56:51]
It's not a review period.
[1:56:53]
Okay. Yeah. So it'll go through the city on that.
[1:56:56]
So you will get notified if somebody does buy this lot anyway.
[1:57:00]
So you'll have some kind of understanding to know in what and who is gonna
[1:57:03]
buy it before it does get built. So just keep an eye out on that
[1:57:07]
if you see a for sale sign, and keep in contact with the city as far as
[1:57:11]
that drainage goes.
[1:57:13]
One other mention that I have on here is the knotweed.
[1:57:16]
I know it's not
[1:57:18]
part of this project now, if we're not going to disturb it.
[1:57:21]
But as far as the record goes, I'll bring it up because
[1:57:24]
Joanne Calderbank sent us an email, and I just want to bring it up to attention.
[1:57:28]
It's an invasive species of weeds.
[1:57:31]
Once it gets moved, and just like the spores go everywhere, it's challenging.
[1:57:34]
So she's concerned with that development of that parcel
[1:57:39]
with that amount of knotweed that was already taken down once, how it came back
[1:57:43]
tenfold. Same thing with bamboo. It's going to keep coming back, and it
[1:57:47]
spreads pretty quick. So that was her concern.
[1:57:50]
I know we're not developing it right now, but again, it's something down the road
[1:57:53]
on that.
[1:57:56]
Other than that, then thank you. Anybody? Go ahead.
[1:57:58]
Just one last thing, Mr. Chair. To the Max, thank you for sending this picture.
[1:58:01]
It's wonderful to see how it used to be.
[1:58:03]
My kids were so intrigued that parts of the canal are still there-
[1:58:06]
Oh, yeah
[1:58:06]
... on the back of your lot.
[1:58:08]
Yeah.
[1:58:08]
Thank you.
[1:58:09]
Yeah, well, you showed me that all excited, too.
[1:58:13]
But yeah, it sounds like you guys know that that's going to be slow.
[1:58:17]
Yes.
[1:58:17]
That's all we wanted you guys to...
[1:58:19]
Yeah, it'll be addressed for sure for water concerns, especially once the
[1:58:23]
lot gets drawn off and where they can build them and so forth from that.
[1:58:29]
But thank you for your-
[1:58:30]
I can deal with that kind of speed, I swear.
[1:58:33]
Right?
[1:58:34]
I was wondering when you were going to crack one.
[1:58:38]
Hey, I got a question.
[1:58:39]
Oh, go ahead, Jason.
[1:58:40]
Yeah, I got a question for Rebecca.
[1:58:42]
So other than single family
[1:58:45]
homes, what else could be built there with the zoning?
[1:58:50]
With the zoning?
[1:58:52]
Yeah.
[1:58:52]
Well,
[1:58:53]
any of the permitted uses in the zoning district could go there, but they'd have to
[1:58:57]
meet
[1:58:59]
the standards of the lot, and given the building envelope, it would be pretty
[1:59:03]
tough to achieve that.
[1:59:05]
Anything
[1:59:08]
that's not a single family home that is more than
[1:59:12]
3,000 square feet of impervious would be back before the board as a site plan.
[1:59:17]
But it's the list of permitted uses in the zoning districts.
[1:59:21]
There are-
[1:59:22]
It's RGA1.
[1:59:24]
Would you like to run-
[1:59:26]
There's a lot.
[1:59:26]
Yeah, there's quite a few, but most of them would not be feasible
[1:59:29]
on that size lot.
[1:59:31]
Cemetery, bed and breakfast.
[1:59:32]
But technically, yes, any of those.
[1:59:38]
Any other board members?
[1:59:39]
Thank you.
[1:59:41]
Thank you. Okay. Well, thank you, Dustin.
[1:59:43]
All right, thank you.
[1:59:43]
With that, the meeting is adjourned.
[1:59:45]
Thank you all.