[0:00]
Ready?
[0:08]
» Williams County Regional Planning
Commission is now called to order.
[0:13]
We do have a quorum. Any announcement,
staff?
[0:19]
» Uh, thank you, Mr. Chairman. On your
desk in front of you, you do have a
[0:22]
revised agenda. Items number 5, 27, and
31 have been withdrawn.
[0:29]
Items number 25, 26, 29, and 32 are on
your consent agenda for deferral. You do
[0:37]
have a revised report for item 31 noting
the withdrawal request on your desk. And
[0:42]
finally, just a reminder that your March
meeting.
[0:49]
» Sorry. Thank you. A reminder that your
March meeting will be held on Thursday,
[0:53]
March the March 19th. So that's the
third Thursday of the month rather than
[0:58]
the second. That's all I have, Mr.
Chairman.
[1:00]
» Thank you.
At this time, we could have the public
[1:04]
comment and no one has signed up for
that. So we'll go to consideration of
[1:09]
the minutes for January 8th, 2026. Has
everybody had a chance to read them,
[1:14]
review them?
>> Motion to approve.
[1:17]
» Second.
>> Motion made in a second. All in favor
[1:19]
signify by saying I.
>> Motion carries. Thank you.
[1:24]
Consideration of the consent agenda. Uh
we'll take it as a whole unless any of
[1:30]
the commissioners want to uh
>> take one. Sharon
[1:35]
» is recusing herself from it.
>> The consent agenda. Mr. Chair. Thank
[1:39]
you.
>> Okay. Do we have a motion on the consent
[1:44]
agenda?
>> Motion to approve.
[1:48]
» Motion made and second. All in favor
signify by saying I.
[1:51]
» I.
>> Approved. Thank you.
[2:00]
The first item on the agenda is Terra
Farerrell Road drainage and erosion
[2:06]
control bond update number 24.
[2:13]
» Hi, uh Brent Theny with True Land
representing Jones Company. Um start
[2:19]
with the fire pit site plan area that
has been submitted is under review by
[2:23]
the county. Um phase one engineer just
sent back that had been under review and
[2:31]
uh the engineer sent back comments from
that today. So we'll work through those,
[2:35]
read through them and work through them.
Phase two, the slope repairs are
[2:40]
essentially 80% of it's done. The fabric
um has been installed. the drains, the
[2:46]
stone. We did a rough, what I would call
final grade, trying to beat the ice
[2:51]
snowstorm and did a rough stabilization.
We'll need to go back, pull that back,
[2:56]
and do a finish final grade on that uh
and restabilize it. Uh so that's yet to
[3:03]
be complete. Um the head walls had not
been finished. The fabric has been um
[3:10]
verified in those and those have been
finished.
[3:14]
Um there's one uh road repair. The
county has asked for more cores for
[3:18]
phase 2 road uh in certain areas. Uh
we've contracted the geotech and we're
[3:24]
waiting for him to do that and we'll see
what comes out of that. There's one
[3:28]
additional um small road repair. We may
tie in with that depending what comes
[3:33]
out of that. Um I think that's it.
There's one homeowner
[3:39]
in the back of a homeowner's yard that's
not on the RD checklist. we've agreed to
[3:43]
fix. Uh that's midway up. That's I'm not
sure what it's from. Um we'll fix that
[3:49]
when we do all the dirt work with the
slope repair. Uh the wastewater road is
[3:54]
I think we're close to making a full
I'll call it determination on that
[3:58]
material and um meeting what the county
needs, working through that. Once that
[4:04]
is ultimately finalized, we'll finish
that part of it. And there's been um one
[4:11]
additional dropout that has opened up
near the wastewater road we'll look at
[4:15]
and have the geotech look at. Um and I
think that's everything to this point.
[4:22]
Okay. Thank you. Is the staff satisfied
with the progress out there?
[4:30]
» Well, yeah, there's progress. Um and I
mean, you know, we're we're definitely
[4:35]
moving in the right direction. Um
there's still a lot of open issues, but
[4:39]
there's quite a few issues that have
been closed. Um so we'll just kind of
[4:44]
have to wait and see. I know, you know,
I agree with the things he said as far
[4:47]
as some of the stabilization been done,
but it it does need some improvement and
[4:51]
some of the pond work, you know, it's
>> worse than needs to be stabilized that
[4:56]
that
>> mat rolled up and we need to fix that.
[5:00]
And also we'll need some more um and
that's one of the open issues um some
[5:04]
slope information from the engineer um
make sure we get all the right um slopes
[5:11]
on site. Um so yeah, I mean it's a work
in progress and um but it it is in
[5:18]
progress so so that's good.
>> Okay, thank you. Does the commission
[5:23]
have any questions to the applicant on
this?
[5:26]
» What uh what can we expect next month?
Uh if the road material gets worked out,
[5:32]
hopefully that'll be completed. Um the
slope repairs should be done. Um
[5:38]
depending on the timing of the geotech
for the additional cores, um may or may
[5:44]
not be done. I would think that would be
done, but until they tell me when they
[5:49]
can get out there, I can't answer that.
Um,
[5:53]
and then if we get the slope repairs,
depending on the engineer being able to
[5:57]
get the additional asbuilt shots, that
may or may not be done depending on
[6:01]
their survey schedule.
>> Okay.
[6:04]
» Um, the pond should be done.
>> Thank you.
[6:07]
» Yep. Sure.
>> Do you have any idea when this will all
[6:12]
be wrapped up?
um hopefully soon but it continues to to
[6:17]
a degree till right till
like the cores right that was sent in
[6:23]
now there's some additional work that
needs to happen there so depending on
[6:27]
what comes out of that result and what
the county determines
[6:32]
uh you know
will depend how fast that can happen um
[6:38]
same with the wastewater road once
that's um gets finalized, you know,
[6:44]
we'll get in on schedule and do it. Um I
haven't looked I started to look at the
[6:48]
phase one comments, so I need to work
through those. I don't know what all's
[6:52]
been requested in those yet. They just
came out today. So,
[6:58]
» okay. Thank you, Mr.
>> Chairman. Sir,
[7:01]
» yeah, I mean, we're starting we're going
to get into the rainy season and uh
[7:06]
their engineer claims that they can
stabilize the wastewater road. We don't
[7:12]
think that that's going to be possible.
So, in that we're going to hold on to
[7:16]
the maintenance bond. We're going to
look at it. It's not like they're going
[7:19]
to get their bond released in the next
couple of months. So, you know, there's
[7:24]
still issues out there. They got ponds
that don't drain. There's no reason why
[7:28]
they couldn't have been going out there
for the last several months and cleaning
[7:32]
some of this up. We got an engineer who
says it's built per the plans. It's not
[7:36]
built per the plans. There are
significant deviations. So, this is
[7:41]
going to take a while and if they don't
get it right by summer, we're going to
[7:45]
be talking about calling the bond.
>> Okay. Thank you.
[7:52]
» Any questions on that?
>> No.
[7:54]
» Okay.
Well, thank you.
[7:57]
» Thank you.
[8:02]
» Okay. Item number 25, uh, Chester Hill,
that's been deferred. And item number 26
[8:09]
has been deferred.
Item numbers 27 has been withdrawn. Item
[8:14]
number 28,
final flat review, reapproval for
[8:19]
Stevens Valley section 12 containing
zero lots on 777 acres located off of
[8:27]
Stevens Valley Boulevard in the eighth
voting district. Staff.
[8:31]
» Yeah, thank you, Mr. Chairman.
The development is located off of
[8:35]
Stevens Valley Boulevard shown in the
red. Section 12 total 0.77 acres. The
[8:41]
section boundary shown in the blue. It
contains zero buildable lots. It'll have
[8:47]
0.53 acres as open space shown in the
green. And the purpose of the reapproval
[8:53]
is to add the uh a condition for the
roads drainage and road control bond.
[8:59]
water and sewers provided by the Harpet
Valley Utility District.
[9:04]
The final plat is consistent with the
prelim prelim preliminary plant and
[9:09]
staff recommends reapproval with
conditions outlined in the staff report
[9:13]
including the estab establishment of the
RDE bond in the amount of $53,000.
[9:21]
» Thank you. Is the applicant present?
[9:27]
» Yes, sir. Uh Jeremy West Morland with
CSTG. I'm the civil engineer on the
[9:31]
site. We have no objections to staff
comments, but I'm happy to answer any
[9:34]
questions that may come up.
>> Any questions of the applicant from the
[9:38]
commission?
[9:43]
» Motion to approve first staff.
>> Motion in a second. All in favor signify
[9:48]
by saying I.
>> I.
[9:50]
» Opposed.
Motion passes. Thank you.
[9:55]
Concept plan item number 29, Old
Murphy'sboro Road has been deferred.
[10:02]
Uh site plan on item 30, non-residential
site plan review for Tomb Creek Farm
[10:10]
Nursery on 10 acres located off Arnold
Road in the 12th voting district. Staff,
[10:16]
» thank you, Mr. Chairman. Sites located
off Arnold Road on a road shown in the
[10:21]
red. The development totals 10.08 acres.
The property boundary shown in the blue.
[10:28]
We're proposing 15 green houses shown in
the green totaling 66,600 square ft for
[10:35]
a nursery producing cut flowers for
retailers. There there will be no retail
[10:40]
activity on site. The existing house and
septic system will remain in the
[10:45]
residential use. It would not be used as
for the nursery. They're going to have
[10:50]
portable toilets for 3 to five
employees. Irrigation will be from
[10:54]
Wales.
And staff recommends approval.
[10:59]
Thank you. Is applicant present.
[11:12]
Uh good afternoon. Uh my name is Son
Choy. I'm the co-owner of the Tonqu
[11:17]
Farm. I'm happy to answer any questions
you guys have.
[11:21]
» Okay.
>> I have a question.
[11:23]
» Yes.
>> So, have the necessary licenses been
[11:26]
obtained through the Tennessee
Department of Agriculture?
[11:29]
» Uh, it's in the process right now uh
being communicating with the uh the
[11:33]
Tennessee Department of Agric
agriculture uh very diligently. Uh they
[11:37]
said that the uh as long as you obtain
uh approval first before you started the
[11:43]
uh selling activity, you'll be fine. So,
yeah, we are in contact with them. Okay.
[11:47]
Do they did they indicate when that when
those would be completed and to you?
[11:52]
» Oh, they said it's a it's a pretty short
turnar around. They shouldn't take too
[11:55]
much time. Uh usually if you submit a
request and they you're looking about
[11:59]
two weeks or three weeks should get
back.
[12:01]
» All right. Thank you.
>> Yes.
[12:05]
» Any other questions?
>> I have a quick question. You may have
[12:08]
said this. How many employees
>> uh
[12:12]
» do you expect
>> Yeah. At a full scale, if you have 15 or
[12:15]
high tunnel constructed, uh the the
total amount of employee should be
[12:19]
around 15. So roughly about one employee
per per uh greenhouse, so to speak.
[12:25]
» Yeah.
[12:29]
» I've got a question. I don't know for
staff or from the applicant, but uh the
[12:33]
the house on the property uh the sewer
system is they're going to do away with
[12:39]
we're going to use portables. Is there
any reason why we're going for portables
[12:43]
on a situation like this
>> with 15 employees?
[12:47]
» The building code does not require
permanent restroom facilities.
[12:52]
And so that's why we're they're going
with the portable facilities.
[12:56]
So we we coordinate it with the building
codes department regarding this this
[13:02]
use.
>> But Aaron, the existing septic system is
[13:05]
going to remain in use for the house.
>> That is correct. Yes.
[13:09]
» Okay. Thank you.
>> Question.
[13:13]
» I was reading this earlier knowing that
there were portable toilets. It
[13:16]
mentioned three to five employees, but
you're saying 15 or 16. I think you said
[13:22]
one per nursery and there's or one per
greenhouse and there's 16 green houses.
[13:27]
» Yeah. 15 green houses all together, but
that will be like a it's a multi-year
[13:31]
phase. We're not constructing all 15 at
one time. Okay.
[13:34]
» So, first year you only look at about
two. Uh so depending on the number of
[13:38]
you know depending how frequent they're
going to be using all the toilets we
[13:41]
might just add a bit more but uh you
know beginning we'll have two to start
[13:44]
off with.
>> Gotcha.
[13:46]
» And then the question for staff is on
parking then
[13:50]
» with this being agricultural RD5. What
are the parking requirements?
[13:56]
» Joe, do you know the parking
requirements?
[13:59]
» Uh not without looking at the ordinance.
Uh,
[14:05]
» I'm just curious cuz I think there's
only like maybe I don't know, I can't
[14:09]
tell from the small scale. I looked at
it larger on the computer, maybe six
[14:13]
parking spaces. And in my mind, it's
like, oh, that makes sense if there's
[14:17]
five employees, but if there's 15
employees, just want to make sure you
[14:21]
have the right parking you need.
>> Uh, yeah, I think on the map there was a
[14:27]
two section of designated parking spot.
uh like a kind of like a semi- customer
[14:32]
parking spot, an employee parking spot
because we don't have any retail
[14:35]
activity going on. So, we can if if
that's a question, we can easily, you
[14:39]
know, add that into that employee
parking, but that will take several
[14:43]
years.
[14:47]
» Commissioner, there's sufficient parking
there.
[14:49]
» Okay, great.
>> I have got a quick question. Um,
[14:56]
so green houses, I'm assuming uh you'll
be using LED grow lights or something
[15:00]
like that
>> at night.
[15:03]
» Yeah, it's uh it's we call them
greenhouse, but essentially those are we
[15:06]
call the high tunnel units. Uh uh they
use the uh largely the the polyethylene.
[15:13]
So those are very transparent to the the
sunlight because we want to be uh
[15:16]
conserving energy and how you guys can
you know require a lot of energy. Uh so
[15:23]
uh and also the uh depending on the
flower type that you have we don't do
[15:26]
any kind of a force flowering and
alteration of their natural hab you know
[15:31]
uh habits. So we don't require that.
>> Okay. Thank you.
[15:34]
» Yeah.
[15:41]
» Another question following up on what
Sharon asked. Uh would the final on the
[15:47]
final on this would they be required to
show the permits agricultural permits?
[15:52]
» They would not be required to. We would
ask them to show them for us. Yes.
[15:58]
» Okay. And we might consider that part of
the motion to
[16:01]
» Yes.
>> Okay.
[16:05]
Any other questions?
[16:09]
Do we have a motion on this item?
[16:14]
I'll make the motion that we require
that the uh necessary licenses permits
[16:20]
are to be shown and have been acquired
by the owner before it's
[16:29]
» are you
>> that is part of your motion
[16:30]
» approval with that condition?
>> Yes. I'm sorry. Yes.
[16:33]
» Okay.
>> Do we have a second on that?
[16:36]
» Second.
All in favor signify by saying I
[16:41]
» opposed. Motion passes. Thank you.
>> Thank you.
[16:46]
» On preliminary plats, item 31
uh has been withdrawn.
[16:53]
Item 32 has been deferred and item
number 33 is preliminary plat review for
[16:58]
Burns subdivision. Phase 2 containing 32
lots on 37.55
[17:04]
acres located off of Patton Road in the
fifth voting district. Staff. Yeah.
[17:10]
Thank you, Mr. Chairman. The development
is located off Patent Road and it's as
[17:15]
access from Horton Highway to the west.
Patent Road shown in the red.
[17:20]
This phase totals 37.55 acres.
There you see the phase boundary in the
[17:25]
blue. Consist of 32 lots. There's the 32
lots in the pink.
[17:30]
be approximately 8 acres of open space
shown in the green and gray.
[17:35]
Uh it will install a greenway trail at
the north perimeter shown in in the dark
[17:40]
green. Roads will be private there. You
see the roads in the yellow. Waters
[17:45]
provided by the Nlesville College Grove
Utility District. Lots are served by a
[17:49]
nontraditional wastewater treatment and
disposal system.
[17:53]
and the preliminary plan is consistent
with the concept plan and staff
[17:58]
recommends approval with that standard
conditions outlined in the staff report.
[18:03]
Thank you. Is the applicant present?
[18:11]
» Yes, Richard House with SEC. Happy to
answer any questions.
[18:15]
» Any problem? Anything with the staff's
report?
[18:18]
» No problems.
>> Okay, fine. Thank you. Any question for
[18:22]
the commission? This applicant
[18:30]
» motion
>> approve for staff recommendation.
[18:34]
» Motion. Do we have a second?
>> Second.
[18:36]
» Motion and second. All in favor signify
by saying I.
[18:39]
» I.
>> Opposed. Motion carries. Thank you.
[18:43]
Item number 34, preliminary platform
burn subdivision phase 3 containing 26
[18:50]
lots on 30.73 acres located off of
patent road in the fifth voting
[18:55]
district. Staff,
>> thank you, Mr. Chairman.
[18:58]
Again, these this development is located
off Patent Road and access from Horton
[19:04]
Highway to the west. This phase totals
30.73 acres shown in the blue. uh
[19:11]
consist of 26 lot shown in pink be
approximately 9.33 37 acres of open
[19:16]
space shown in the greenway
trail will be uh installed on the north
[19:23]
perimeter um in alignment with the phase
two roads will be private
[19:31]
shown in the yellow water be provided by
the Nville Cro utility district lots are
[19:37]
served by a nontraditional wastewater
treatment and disposal system. The
[19:41]
preliminary plan is consistent with con
with with the concept plan and staff
[19:45]
recommends approval with the standard
conditions outlined in the staff report.
[19:50]
» Thank you.
[19:56]
» No issues with the staff report.
>> Okay. Thank you. Any questions of the
[20:00]
applicant on this?
>> Quick question,
[20:03]
» sir.
>> The greenway, I see that it's near 840.
[20:07]
How close is that to the interstate?
>> It's uh about from the actual road
[20:14]
itself, it's probably a couple hundred
feet, but it's it's within our boundary,
[20:18]
I think 50 feet or so.
>> Okay.
[20:22]
» Is it is there any buffer between the
greenway and the interstate or is it
[20:25]
» There are trees and stuff between the
interstate. So,
[20:31]
okay.
[20:34]
» Any other questions?
[20:38]
Do we have a motion on this item?
>> Motion to approve first.
[20:43]
» A motion to second. All in favor signify
by saying I. I.
[20:47]
» Motion passes. Thank you. Item number
35, preliminary plat review for the keep
[20:54]
at Arrington subdivision containing 13
lots on 88.03 acres located off of Haley
[21:01]
Road Lane in the fifth voting district.
Staff.
[21:05]
» Thank you, Mr. chairman. This property
is located off of Haley Lane, shown in
[21:09]
red along the right side of the screen.
The development total is 88.03 acres in
[21:14]
size and contains 13 lots shown in the
pink. Uh there's approximately 13.2
[21:20]
acres of open space and that is shown in
the green. The roads will be public and
[21:24]
the roads are shown in the yellow.
Waters provided by the Nolanville
[21:27]
College Grove Utility District. Lots
will be served by individual on-site
[21:31]
sector systems. The Department of S not
yet. Uh this plan is consistent with the
[21:35]
concept plan and staff recommends
approval standard conditions outlined in
[21:38]
the staff report.
>> Thank you. The applicant present
[21:46]
» one last time.
>> No issues with the stock report.
[21:51]
» Any questions of this applicant?
>> Do we have a motion?
[21:59]
» Motion and second. All in favor signify
by saying I. opposed. Motion passes.
[22:05]
Thank you.
>> Thank you.
[22:08]
» Under final plats, item number 36, final
plat review for re-ubdivision of lot
[22:14]
one, the Flint Meadow LLC subdivision
containing three lots on 18.25 acres
[22:21]
located off of Steeplechase Lane in the
eighth voting district. Staff, thank
[22:26]
you, Mr. Chairman. The property is
located off Steeplechase Lane shown in
[22:30]
red at the top of the screen. The
development total is 19.25 acres in
[22:34]
size. You can see the entire development
in the blue. The development contains
[22:38]
one lot created in 2022 and this will be
adding two family subdivision lots for a
[22:43]
total of three lots. The family
subdivision lots are shown in the pink.
[22:47]
These lots are accessed by an access
easement shown in the yellow. Resource
[22:51]
action standards have been met. Water is
provided by the Harpath Valley Utility
[22:54]
District. Wastewater handled via the
Harpath Valley Utility District as well.
[22:59]
The revised final plat is in order and
staff recommends approval with the
[23:02]
standard conditions outlined in the
staff report.
[23:04]
» Thank you. Is the applicant present?
[23:11]
» It's Tim Donlin with Don Land Surveying.
>> You have anything to add to staff's
[23:16]
report?
>> Pardon?
[23:17]
» Anything to add to staff report?
>> No.
[23:21]
» Any questions of the applicant?
>> Motion to approve first. Second. Motion
[23:28]
made and second. All in favor signify by
saying I.
[23:31]
» I.
>> Opposed. Motion passes. Thank you.
[23:34]
» Thank you.
>> Item number 37, final flat review for
[23:40]
Wild Grass LL subdivision containing
three lots on 95.48
[23:46]
acres located off Casper Road in the
first voting district. Staff.
[23:52]
» Thank you, Mr. Chairman. Uh this
property is located off Cas Casperis
[23:56]
Road as you can see in red on the upper
left corner of the screen.
[24:00]
Uh the development consists of 95.48
acres.
[24:05]
Um it will have three lots uh shown in
pink.
[24:10]
The lots are accessed by an access
easement shown in yellow.
[24:15]
The resource protection standards have
been met.
[24:19]
Water will be provided by individual
on-site wells.
[24:23]
Waste water will be handled via
individual on-site septic systems.
[24:28]
The final plat is consistent with the
preliminary plat
[24:32]
and staff recommends approval with
standard conditions outlined in the
[24:35]
staff report.
>> Thank you. The applicant present.
[24:44]
» Keith Brotherton. I'm the surveyor for
the project. I answer any questions.
[24:49]
» Do you have anything to add to staff's
reporter?
[24:51]
» Okay. Any questions of the applicant?
>> Motion to approve for staff.
[24:58]
» Second.
>> Motion made in a second. All in favor
[25:01]
signify by saying I.
>> Opposed.
[25:04]
» Motion passes. Thank you.
>> Commissioner, can I say one thing,
[25:07]
» sir? Um, there was a an item that was
supposed to be added to the non-consent
[25:12]
agenda or the non-aggenda item tonight
and I think it failed to make it. The
[25:18]
owner is on his way here and he would
like to just voice his opinion on this
[25:23]
issue. Um, he's about 15 minutes away. I
didn't know if staff would be willing to
[25:28]
hear him out.
Mr. Chairman, and a request from Mr.
[25:35]
Brotherton was not made to our office
for the non-aggenda item. I only learned
[25:40]
about it this when Mr. Brotherton came
in. We discussed it, but we did not
[25:46]
receive a request for a non-aggenda
item. That's why it does not appear on
[25:50]
your agenda and I did not make the
announcement earlier.
[25:53]
» Okay.
[25:56]
Is it's something that's coming before
us?
[25:59]
» It will be the next meeting.
>> It'll be here in your at your March
[26:03]
meeting. Yes.
>> Okay.
[26:05]
So, what why why can't you wait till the
next meeting?
[26:09]
» Well, the the owner did schedule a
meeting. Um, it it was held on January
[26:15]
15th. It was myself, the owner, and
Aaron at the meeting. Uh, I know the
[26:20]
owner did follow up with an email after
the meeting. Um, and I was not aware
[26:25]
that I needed to send uh another email
requesting this to be on as a
[26:30]
non-aggenda item.
Um, I know this is very important to
[26:33]
him. I I'm just acting in his place for
the moment because he's on his way and
[26:37]
he'd like to make sure he had a moment
to speak and I think the way we're
[26:41]
cruising through the agenda. I just
didn't want him not to be able to have
[26:44]
that time.
>> Um, look, since we haven't been notified
[26:49]
ahead of time and stuff, I think we'll
have to wait for for the next meeting.
[26:53]
It's nothing we should handle at this
meeting at this time. Okay.
[26:57]
» But I appreciate you coming and telling
us. Thank you.
[27:03]
Item number 39, final plat review
revised for Fair Farms LLE subdivision
[27:09]
containing three lots on 42 point.
>> Oh, I'm sorry. Uh, I'm sorry. Final
[27:18]
thought review for Emerson Ridge LL
subdivision containing five lots on
[27:23]
54.91
acres located off of Haley Road in the
[27:28]
fifth voting district.
[27:33]
Go
on the right. It's Hill. Oh,
[27:43]
» excuse me.
[27:57]
Yeah, it's still the same project. It's
just the street is different. It's a
[28:01]
different
>> This is Gozy Hill Road.
[28:03]
» Yeah.
>> But didn't we Okay.
[28:08]
I'm sorry. Uh item number 38 is final
flat review for Emerson Road LLE
[28:16]
containing five lots on 54.91 acres
located off of Goce Hill Road in the
[28:22]
fifth voting district.
Staff.
[28:27]
» Thank you, Mr. Chairman,
>> the property is located
[28:33]
off of Gocei Hill Road, shown in red on
the left side of the screen. The
[28:38]
development totals 54.91 acres in size
and contains five lots which are shown
[28:43]
in the
lots will be accessed by an access
[28:47]
easement shown in the yellow the center
of the screen. Resource protection
[28:51]
standards have been met. Water will be
provided by the Milrooft and utility
[28:54]
district and waste water is going to be
handled via individual on-site septic
[28:58]
systems which the department of sewage
disposal management has approved. This
[29:02]
final plan is consistent with the
preliminary plan and staff's approval
[29:05]
the standard conditions outlined in the
staff report.
[29:08]
» Thank you. Does the applicant present?
[29:16]
» Good evening. My name is Richard
Sullivan. I'm with Svin Engineering. I'm
[29:20]
representing this project.
>> Have any questions as far as staff's
[29:25]
report?
>> All good.
[29:28]
» Okay. Thank you. Any questions this
applicant?
[29:33]
» Motion to approve our staff.
>> Motion approved. Do we have a second?
[29:38]
» Second.
>> Motion made a second. All in favor
[29:40]
signify by saying I. I.
>> Opposed. Motion passes. Thank you.
[29:45]
» Thank you.
[29:48]
Item 39,
final plat review revised for Fair Farm
[29:54]
LLE subdivision containing three lots on
42.48 acres located off of Spantown Road
[30:01]
in the fifth voting district. Staff,
>> thank you, Mr. Chairman. The property is
[30:06]
located off Spantown Road, which is
shown in red on the left side of the
[30:09]
screen. The development totals 42.48
acres in size. It contains five lots,
[30:13]
which will be shown in the pic. They're
revising this plat to add two fire
[30:18]
hydrants to reduce the minimum building
separation between the lots. The lots
[30:22]
are accessed by a shared access easement
shown in the yellow at the center of the
[30:25]
screen. Water's provided by Nolanville
College Grove Utility District and
[30:28]
wastewater handled via individual
on-site sector systems which the
[30:31]
department of silos management has
approved. This final plat's consistent
[30:35]
with plinary plat staff recommends
approval. Standard conditions outline
[30:38]
the staff report.
>> Thank you. The applicant present.
[30:48]
Hi, Daniel Alman Tquare Engineering.
>> Do you have anything to add just to
[30:52]
report?
>> No, sir.
[30:53]
» Okay. Any questions as applicant?
>> Yes, sir.
[30:59]
» How long have you been growing that
beard?
[31:02]
» Uh 15 years.
>> Okay. It's impressive.
[31:06]
» It stopped growing like
five or six years ago.
[31:11]
» Okay.
Okay. Any other questions?
[31:18]
» Motion to approve per staff.
>> Second.
[31:20]
» Motion second. All in favor signify by
saying I.
[31:24]
» Opposed.
>> Motion passes. Thank you.
[31:27]
» Thank you, sir.
>> Do you have any other business?