Good evening, everyone.
[0:02]
I want to start by thanking everyone
[0:06]
for their attention to the
presentation I'm about to give this
[0:09]
I'm here to present the proposed 2026
annual budget for Willistown
[0:15]
I believe it is screen sharing to
Zoom, but I might intermittently
[0:21]
to make sure that everything is
proceeding properly there.
[0:25]
So tonight I will begin with
highlights of the past year,
[0:28]
then discuss the taxes that are
levied in the township, detailed
[0:35]
township funds for the coming year,
and provide initial information
[0:40]
preliminary sewer rates. Please hold
your questions to the end of the
[0:43]
presentation when the board chair
will open the floor to the public.
[0:49]
So again, as I said, we will begin
with a look back
[0:53]
at 2025.
[1:00]
Beginning with roads and
infrastructure that most Willistown
[1:04]
I'm pleased first of all to share
[1:06]
that the Garrett Mill Road bridge,
which has been closed since the
[1:11]
of 2023, is expected to reopen before
the end of this calendar year.
[1:18]
Our roadway resurfacing program this
year paved approximately 3.26 miles
[1:25]
and our public works crews filled
over 100 potholes after a rough
[1:30]
Intersection striping was conducted
at three intersections along Paoli
[1:34]
as well as long line restriping
throughout the township.
[1:37]
And while you've been traveling
through the township, you might have
[1:40]
one of our new township street signs
there in the middle.
[1:43]
Uh, which are gradually being
replaced, uh, throughout the
[1:47]
And then of course the Public Works
Department also completed regular
[1:54]
our dirt roads, um, and emergency
weather operations in order to keep
[1:57]
motorists and other road users safe.
[1:59]
And then finally the historic Bartram
Covered Bridge also underwent
[2:08]
year, which Willistown funded in
partnership with Newtown Township,
[2:11]
That bridge spans both of our
municipalities.
[2:14]
Moving ahead to sanitary sewer. Uh,
in addition to regular routine
[2:17]
maintenance, significant efforts were
made this year to address problems
[2:21]
A crucial part of that is the
televising, um methodical televising
[2:28]
about earlier this evening. We're on
track to clean and televise 95,000
[2:35]
halfway through as Mr. Hagan noted.
Um, as you might know, the Township's
[2:39]
sewer collection system has
experienced breaks and needed
[2:46]
several years, and I'm sorry to say
2025 was no exception.
[2:49]
We experienced a break on Eisenhower
Drive as you might recall.
[2:53]
Um, you can see that failed sewer
pipe there in the center photograph,
[3:01]
It's like I am screen sharing, that's
good.
[3:04]
Uh, fortunately this was already
scheduled for repair, this particular
[3:10]
uh, grant funding for it that had
already been awarded that we were
[3:15]
that repair. Additional planned
repairs that uh Mr. Hagan talked
[3:24]
right away and on Cobblestone uh were
begun and are are ongoing.
[3:28]
Uh, and then finally following 2024's
sewage management study, a dedicated
[3:33]
volunteer group of sewer users, some
of whom are here this evening, uh,
[3:41]
Wastewater Authority Advisory
Committee this year. And that
[3:48]
develop recommendations for the Board
of supervisors regarding the
[3:55]
I'll note that an authority has not
yet been established and as such, the
[4:03]
the current sewer funds.
[4:08]
Stormwater management, a vital issue
that the Board of supervisors has
[4:14]
few years. This is another part of
our township infrastructure that is
[4:20]
Uh, our public Works crew completed
inlet and pipe repairs throughout the
[4:25]
pipe was replaced. You can see some
of that work on Radner Road in the
[4:29]
photo on the left. Uh Spring Road
remains closed due to the culvert
[4:34]
right. We continue to work towards a
solution to make that repair, but the
[4:42]
by the commencement of litigation
against the township by an adjacent
[4:48]
Stormwater engineer, HRG, completed a
township wide stormwater study in
[4:54]
study form the basis of the projects
that have been and will continue to
[4:59]
the Forest Lane and Chetlin Road
projects that are currently being
[5:05]
And then in the center photograph,
you see the uh crews completing
[5:06]
the improvements to Storm water
infrastructure at Mill Park.
[5:07]
talk more about those later.
[5:08]
And then in addition, a stream
restoration project along uh Crum
[5:11]
Our summer outdoor program for kids,
Go Wilma,
[5:12]
that was uh identified will meet some
state mandated pollution reduction
[5:15]
is now in its 14th year.
[5:16]
Uh we had 567 adventurers
[5:17]
join in on the fun during this
summer, which was the highest
[5:19]
number we've seen since uh before the
pandemic, actually.
[5:23]
Uh participants visited 18 parks,
preserves and historic sites
[5:26]
in Willistown and the surrounding
municipalities.
[5:29]
Um, the Owl Prowl in Oka Hoking,
[5:31]
I'm glad I said that, got that out
that tongue twister,
[5:34]
has become a seasonal favorite.
[5:35]
Uh, we sold that one out.
[5:37]
Attendees got to see some and hear
wild screech owls
[5:40]
at Oka Hoking preserve during their
hike.
[5:43]
Other free programs that we offered
this year included
[5:46]
uh meditative hike, a tour of the
Serpentine Barons
[5:49]
and a wildlife walk.
[5:51]
We got a lot of positive feedback for
these expanded offerings
[5:53]
of free daytime, mostly daytime
events
[5:56]
geared toward adults to learn about
our parks and preserves
[5:58]
and the nature all around us.
[6:01]
Um and our park parties continue to
be a hit.
[6:04]
Uh the end of summer country
Willistown Country Fair
[6:06]
had over 350 attendees this year.
[6:09]
Um, and then at this year's recycling
events for residents,
[6:12]
at e-waste, we recycled 19,915 pounds
of e-waste
[6:16]
and seven, almost 8,000 pounds of
paper at our spring shredding event
[6:20]
and don't forget our shredding event
coming up.
[6:23]
that will also include that pilot
program for battery recycling.
[6:27]
And then we did also continue our
partnership with CRC,
[6:30]
our local Water sheds Association.
[6:32]
um on two projects, a spring stream
cleanup at Oking
[6:35]
removed 1,000 pounds of trash and two
tires out of Ridley Creek.
[6:39]
And then earlier this month, we uh
partnered with CRC on a tree giveaway
[6:44]
And that was a grant funded program
that was incredibly well received
[6:46]
that we're hoping to repeat in future
years.
[6:49]
Parks and preserves, we made some
needed improvements to township parks
[6:53]
New swing set and security and camera
upgrades down at Rita Reeves
[6:56]
uh Memorial Park.
[6:58]
Our very popular Gaga Ball pit
[7:00]
at Greentree Park as well as a new
drinking fountain with a
[7:03]
water bottle water bottle filling
station
[7:06]
at Greentree.
[7:08]
Um, we updated trail signage in Oking
Preserve,
[7:11]
And as for park planning, demolition
of the house located at the site
[7:15]
of the future Monument Road
Neighborhood Park and Bird Sanctuary
[7:19]
And I'll speak more about that park
later in this presentation.
[7:22]
Uh, we also had field use and
pavilion rentals increase in 2025.
[7:26]
The Public Works Department purchased
a uh ABI force ball field groomer,
[7:31]
um and implemented an in-house field
maintenance program.
[7:34]
and that improved playing services
throughout the season,
[7:37]
uh and the increased park Reynolds
did reflect that.
[7:40]
Park use fees totaled 80- $8,700 in
2025
[7:43]
compared to just over $5,000 in 2024.
[7:46]
And there wasn't a change in fees, so
that was just increased usage.
[7:50]
Our police department,
[7:52]
um responsible for law enforcement
and preventing and investigating
[7:56]
engaging community policing, traffic
control, accident response,
[7:59]
and supporting various public safety
initiatives throughout the township.
[8:02]
We have 19 sworn officers including
our chief and lieutenant, you see
[8:07]
five sergeants, two criminal
investigators, two traffic officers
[8:11]
plus two members of a non-uniform
administrative staff who support the
[8:16]
They respond to approximately 10,000
calls annually, including alarms,
[8:20]
mutual aid, criminal reports,
crashes, domestic disturbances,
[8:24]
medical calls.
[8:25]
Um, they continued their community
outreach with visits to public and
[8:30]
their ride to school with a police
officer program,
[8:33]
um, and uh presentations to seniors
about elder scams,
[8:38]
National Night Out, and after school
forensics club among many other
[8:43]
I want to also point out they are a
participant in the Westchester Area
[8:47]
the regional team of departments
which provide mutual aid in times of
[8:52]
Big thing, um, and I'm sorry that
this is covering it up for the
[8:56]
viewers here.
[8:58]
Um, see if I can move this.
[9:02]
There's a hide button there.
[9:03]
Well, you can see, you can't see our
[laughter]
[9:07]
changing of the guard here.
[9:09]
Um, we saw us the retirement of Chief
Klinger
[9:13]
and the appointment of Chief Heim and
Lieutenant Jones.
[9:16]
Uh sergeants LaPierre and Hill also
retired
[9:18]
and we were joined by three new
officers, Officer Hoffy, Officer
[9:22]
And then in the spring, uh sergeants
Ash and Sergeant Vibon were promoted
[9:27]
Um and then in the fall, uh Detective
Matt Brown
[9:30]
was promoted to Sergeant of Criminal
Investigations and Officer Daven
[9:33]
Davenport joins our detective
division.
[9:36]
So a lot of personnel changes over in
our police department,
[9:39]
um, which is a fantastic department,
[9:42]
but there has been some, uh, some new
developments over there.
[9:46]
Another department where we've seen a
little bit of uh personnel change is
[9:51]
The retirement of our longtime
building code official Ed Tiernan,
[9:55]
um who's I'm sure would not be
thrilled to see his photo in this
[10:00]
mentation. [laughter] Um, but we
missed.
[10:03]
Um, as well as the retirement of our
[10:05]
uh planning director of planning and
zoning, Bob Smiley.
[10:08]
Um, assistant director of planning
and zoning Caroline O'Conor
[10:11]
stepped into the role of the director
this year, and John Redman recently
[10:16]
And we are hoping to replace uh the
position that uh Ms. O'Conor vacated
[10:23]
Uh, there's a lot of activity in
these departments as you can see.
[10:26]
680 building department permits that
includes uh new construction,
[10:31]
uh mechanical, plumbing, electrical
work, uh that sort of thing,
[10:34]
were uh issued year to date along
with 247 zoning department permits
[10:40]
Uh uh accessory structures,
hardscaping improvements
[10:43]
and soil and erosion, that kind of
thing were issued so far this year.
[10:48]
And then finally, we made some first
steps this year toward our township
[10:53]
Uh staff worked with our planning
consultant to develop an RFP to seek
[10:59]
Uh circulation study, which is a
study recommended by the
[11:04]
We received five submissions with
this which the staff reviewed
[11:07]
and you'll see that item later on
this evening's agenda.
[11:13]
Of course, uh here on our Township
campus, the biggest activity
[11:16]
has been the project to demolish and
reconstruct our
[11:19]
uh public works facilities which had
been in dire need of replacement for
[11:23]
Uh demolition of the truck barn and
the salt shed is complete
[11:25]
and construction of the new salt shed
and fuel station are anticipated this
[11:29]
Additional uh work to follow, which
I'll talk about later.
[11:34]
Um here at the township building, a
smaller project,
[11:36]
the renovation of the board room's
emergency exit right over there,
[11:39]
uh was completed in house by our
Public Works staff.
[11:43]
And uh we are uh
[11:46]
sorry, lost my place.
[11:48]
Um as we planned in the 2025 uh
budget, we did issue general
[11:53]
This year we received, we're very
pleased to tell you that we received
[11:56]
a uh AAA bond rating from Moody's
[11:59]
in advance of that bond issuance. Um,
[12:03]
in terms of public outreach, we
develop and distribute three issues
[12:08]
and I do hope residents take the time
to read it.
[12:11]
It contains important information uh
about programs and services
[12:15]
as well as um efforts to implement
the policies of the Board of
[12:19]
We also share updates through our
township Facebook and Instagram
[12:22]
and we hope that you sign up for
updates from our website.
[12:26]
Okay. We've taken a look back,
[12:29]
and the sun is setting on 2025, so we
turn now to the year ahead.
[12:35]
Let's start with some budget
highlights.
[12:37]
High level view of the 2026 budget.
[12:39]
The general fund, which we will
discuss in a moment, is balanced at
[12:45]
There are no proposed property tax or
earned income tax increases.
[12:49]
Uh in the 2026 proposed budget.
[12:53]
We are projecting a surplus of $2.5
million for 2025.
[12:57]
As the board knows, it's been a long
time practice
[13:00]
that the previous year's surplus is
utilized to fund the next year's
[13:04]
which I'll talk more about when we
get to the capital fund slide.
[13:07]
The Willistown budget serves many
functions, but some of them are
[13:11]
that it's a policy document, it's a
financial plan, it's a communications
[13:16]
The budget sets forth the board's
goals, how those will be executed,
[13:21]
and this presentation itself
communicates to you, the members of
[13:28]
You'll see in this presentation
[13:31]
tonight that Willistown budgets
revenues conservatively and expenses
[13:36]
We budget for level services and to
improve and enhance programs.
[13:40]
So that's that's our budget
philosophy.
[13:45]
And the budget process, you'll see an
overview here on the budget timeline.
[13:49]
Boards and commissions of course,
including the Board of Supervisors,
[13:54]
and then departmental budget drafts
were begun in August. We've been
[14:00]
Tonight, this is the public
presentation of the proposed budget
[14:04]
and provided the board authorizes
advertisement,
[14:06]
we'll make the budget draft available
to the public as early as tomorrow.
[14:10]
Um and the board will vote on the
proposed budget to adopt it at their
[14:18]
So we're going to take a look at
revenue, which yes, of course, does
[14:22]
Various taxes are levied by
Willistown Township.
[14:25]
We've got property taxes which are
levied at .28 mills, EIT, which is
[14:30]
is 1% for Willistown residents and
7/8 of 1% for non-residents.
[14:35]
The local services tax is payable by
all those who work in Willistown
[14:39]
and it is $52 annually.
[14:41]
And the real estate transfer tax,
[14:44]
which is one half of 1% on the value
of the real estate transferred.
[14:48]
So let's zoom in for a second on that
real estate tax piece.
[14:52]
Uh property owners in Willistown are
taxed at a total millage of 30.664
[15:00]
And that is for the Township, County
and School District combined.
[15:03]
So of a property owner's overall real
estate tax bill, approximately
[15:07]
82% represented here by 82 cents of
every dollar.
[15:13]
Um, goes to Great Valley School
District, 17% to Chester County,
[15:17]
and it's actually less than 1% to
Willistown Township.
[15:20]
So let me just give you an example.
[15:22]
Assuming that a property owner has a
parcel with an assessed
[15:24]
value of $200,000, they would have a
total property
[15:27]
tax bill of about $6,133.
[15:33]
$56 would come to Willistown,
[15:35]
$1,033 to Chester County,
[15:37]
and $5,044 to the Great Valley School
District.
[15:40]
So when you see your real estate tax
bill,
[15:43]
you might see it all in one fell
swoop.
[15:45]
That's how it breaks down dollar for
dollar.
[15:49]
But speaking more broadly about
revenue,
[15:51]
this chart shows the revenue
breakdown of the general fund.
[15:55]
The top five sources are specifically
called out here
[15:57]
by percentage.
[16:00]
As you can see, the largest source by
far is earned income tax,
[16:03]
uh, which in the 2026 proposed budget
totals $7,620,000.
[16:09]
This is a conservative budget.
[16:11]
We budget revenues conservatively.
[16:13]
Our EIT actuals, our earned income
tax that we get in,
[16:17]
is often higher than what's budgeted.
[16:20]
And it's important that we account
for potential significant changes.
[16:23]
The strategy of conservative
budgeting
[16:26]
is something we do as we note that
other taxing entities,
[16:30]
like neighboring municipalities,
[16:33]
uh, might consider enacting or
increasing their own EIT,
[16:36]
which would decrease our collections
from non-residents who work in
[16:41]
In addition, the distribution of EIT
[16:44]
from individual taxpayers in
Willistown is becoming increasingly
[16:48]
inbalanced, unbalanced.
[16:50]
Um, by that I mean historically the
top 50 tax accounts of Willistown
[16:55]
account for approximately $2 million
in EIT collections
[17:00]
with just a handful of residents.
[17:02]
Um, half, half of that, $1 million
coming from
[17:05]
just a handful of residents.
[17:06]
Five residents alone.
[17:09]
Forgive me for interrupting.
[17:10]
Can you just repeat that one time?
[17:12]
Yes. So it's very important point for
everybody.
[17:14]
The top 50 tax accounts of Willistown
residents
[17:18]
account for approximately $2 million
in EIT collections
[17:22]
with half of that, $1 million, coming
from the top five accounts alone.
[17:27]
Five tax accounts.
[17:29]
or five individuals.
[17:30]
So, in other words, a change in
status of
[17:33]
a handful of people if they were to
move out of the township,
[17:37]
move into um, uh,
[17:41]
retire or die or or
[17:43]
take their income elsewhere.
[17:45]
Or take their income in any non W2
format. format.
[17:50]
It could significantly change what we
collect in EIT. Yeah.
[17:53]
And that's one reason for the but
board's conservative budgeting
[17:57]
because we don't want to count on
money that is
[18:00]
this is, let me put it simply,
[18:02]
EIT is one of the least predictable
revenue sources.
[18:05]
We know what the assessed value of
the real estate in the township is.
[18:08]
We know what the millage rate is.
[18:11]
So we can do that calculation and
determine with relative certainty
[18:15]
what we're going to receive in real
estate taxes in a given year.
[18:18]
We don't know what people are going
to make,
[18:20]
and we look at that over time. We
don't know individuals, who those
[18:25]
but we do know how what an any given
individual's history might be.
[18:31]
So we see people pop up out of
nowhere. Our
[18:34]
those top, those top five for example
are not the same five individuals
[18:38]
year after year after year.
[18:39]
No, our top one for 2024 was brand
new.
[18:43]
We we hadn't seen them in our top 50
in over the last five years.
[18:47]
translating to the fact that 70% of
our Township revenue is precarious.
[18:52]
Correct.
[18:55]
So this is revenue again of the
general fund, so those tax sources.
[19:01]
Um, you know what, let me go back.
[19:04]
I didn't speak about the other
sources.
[19:05]
These these uh pieces here from real
estate transfer tax,
[19:09]
charge for services, inter-
governmental revenue and property
[19:12]
those are four to six percent of the
whole.
[19:14]
And they range, just for
clarification, from about $385,000
[19:17]
to $650,000.
[19:20]
So those are what those pieces of the
pie represent.
[19:27]
So, over the past few years,
[19:29]
the three years that that I've been
here, I'm not crediting it to me, but
[19:33]
um, the township has been
particularly aggressive
[19:36]
in our pursuit of grant funding for
various projects.
[19:38]
Let me speak a little bit about how
that grant funding appears in the
[19:41]
So generally speaking, grants appear
in the budget in the following ways.
[19:45]
If a grant has been awarded,
[19:48]
we will budget for the revenue in the
year it's expected to be received.
[19:52]
If a grant has not yet been awarded,
but we have applied for it,
[19:56]
we will either budget without any
revenue offset, if we
[20:00]
tend to do the project no matter
what.
[20:02]
Or we will not include the
expenditure
[20:04]
if we're not going to do the project
without the grant funding.
[20:09]
So that's how the grants appear in
the budget.
[20:11]
why you will maybe see them or not
see expenditures
[20:14]
related to those projects.
[20:16]
That's what that means.
[20:18]
So, as you saw earlier on the agenda
this evening,
[20:22]
we applied for several local share
account grants again this year.
[20:26]
Those are grants where we've seen
some success in the past.
[20:28]
Uh, this is statewide funding that is
the distribution of revenues
[20:32]
provided by the PA Race Horse
Development and Gaming Act.
[20:36]
Uh, Greenlight Go, um, is state
funding for traffic signal projects.
[20:40]
We do have a Greenlight Go that has
already been awarded,
[20:43]
so there's a revenue offset for the
80% of the fiber interconnect
[20:47]
project that's included in the 2026
budget.
[20:50]
Uh I think it was on the board's last
agenda.
[20:52]
We, uh... was it the last year
agenda.
[20:56]
you approved the authorized uh the
Pico Green Region grant,
[20:59]
which is a program that funds open
space projects
[21:02]
and that's for the Okahoking
reforestation project.
[21:05]
This is in the budget without revenue
offset. In other words,
[21:08]
we um uh intend to proceed with it no
matter what
[21:11]
and we won't hear about the award
until the spring.
[21:15]
We're still awaiting an announcement
uh of the small water and sewer grant
[21:18]
we applied for for the Westchester
Pike sewer needs area.
[21:22]
That's uh state funding for small
budget which is under $500,000,
[21:26]
water, sewer and storm water
projects.
[21:29]
We also, as you approved earlier
tonight, will be applying for
[21:32]
another LSA grant for that project as
well.
[21:35]
Um we're also continuing to work with
the National Park Service and General
[21:39]
following the township's application
to the Federal Lands to Parks program
[21:43]
for the acquisition of the Nike site
[21:45]
on Delchester Road.
[21:46]
That's Nike like missile, not Nike
like shoe.
[21:49]
Uh, this is not a monetary grant.
[21:51]
It is a program that transfers
surplus federal land
[21:53]
to municipalities for park purposes.
[21:57]
Um, conversations are on pause right
now due to the federal government
[22:02]
but we do remain optimistic about um
that program.
[22:06]
Um and finally, we will be submitting
a
[22:08]
80% reimbursement application for the
total cost of the Garrett Mill
[22:12]
Road Bridge program for an award
that's already been awarded
[22:16]
through the DVRPC Municipal Bridge
retro reimbursement program.
[22:20]
So we got 80% of that uh bridge
replacement covered,
[22:24]
which I think is spectacular.
[22:25]
So, those are some of the grants that
I just wanted to highlight
[22:28]
because actually, um a comment that I
heard at a previous meeting mentioned
[22:31]
that we don't always talk about the
grants that we apply for and receive,
[22:35]
and I think it's worth saying
[22:36]
cuz that definitely falls under
revenue.
[22:39]
So let's detail a little bit closer
into the various township funds.
[22:43]
Let's look at the general fund, which
was mentioned in the overview, $11
[22:47]
This is the operating fund for the
township departments.
[22:50]
So that includes administration,
public works, police, parks, all
[22:54]
Revenue sources include the taxes,
fees, permits, fines, interest,
[22:58]
grants, state funding, etc.
[23:01]
Uh the 2026 budget is balanced at
$11,128,810.
[23:08]
I know I skipped over highlights
because I'm going to talk about them
[23:12]
Some highlights in the general fund
include the township-wide
[23:14]
circulation study, which is a
planning study for the
[23:17]
non-motorized uh transportation
throughout the township.
[23:20]
Uh continued implementation of GIS
software,
[23:23]
additional in-house storm water inlet
repairs, continuation of
[23:26]
the street sign replacement program I
mentioned earlier,
[23:29]
and an expansion of our in-house
maintenance program for our ball
[23:33]
The general fund also includes a 20%
increase for our fire departments.
[23:38]
That amounts to over $100,000.
[23:40]
Um as well as continued police
department uh community outreach
[23:47]
This chart here breaks down the
general fund by expenditures,
[23:51]
the general fund expenditures by
department roughly.
[23:54]
The blue slice here is the police
department
[23:57]
with a budget that totals 5,820,984.
[24:02]
Public works totals 1.8 million
[24:04]
and change, uh administration
[24:05]
management and finance comes in at
1.4.
[24:10]
Fire protection emergency management
823,000.
[24:13]
Building and planning department
706,000,
[24:16]
parks and recreation 424,714.
[24:21]
And the remaining programs and
services in the budget,
[24:23]
which is primarily uh recycling
programs and our library support is
[24:28]
134,000 $318.
[24:32]
I can come back to that if you need
me to repeat any of those numbers.
[24:38]
So the breakdown that we just looked
at does not include capital
[24:44]
So what are capital purchases?
[24:46]
Well, capital assets are major
purchases
[24:48]
with an additional, excuse me, with
an initial cost of $10,000
[24:50]
or more and an estimated
[24:52]
useful life of greater than one year.
[24:55]
For 2026, we see capital investments
presented in the proposed budget.
[25:00]
budget at seven million
[25:02]
$652,690.
[25:04]
Um, these are slated to be funded by
bond proceeds.
[25:09]
That's the biggest chunk that
includes
[25:11]
$5.3 million toward the completion of
the Public Works facility.
[25:15]
Other funding sources include grant
funding
[25:17]
and a transfer of $2 million from the
surplus
[25:19]
that I mentioned earlier, the 2025
estimated surplus.
[25:23]
That's going to be an interfund
transfer
[25:25]
that's necessary for any proposed
use.
[25:27]
It's allocated by the board by
resolution at a public meeting
[25:31]
and that I believe will be on your
next agenda for your agenda for
[25:35]
So those are always done by board
resolution in public.
[25:40]
Let's explore what the capital
purchases are this coming year.
[25:43]
Um, as I mentioned, on the Township
campus, we anticipate the completion
[25:46]
of the new public works facilities in
Q3 next year.
[25:49]
Uh, $550,000 is budgeted for the
replacement
[25:53]
of the Hck system in the police
building, which is
[25:56]
fair to say sorely needed, very
sorely needed.
[25:58]
Yes.
[26:00]
Um, exterior painting here in this
building uh was deferred this year,
[26:06]
we didn't, so we're pushing that to
next year.
[26:07]
As well as some uh smaller furniture
upgrades for the offices in this
[26:13]
Uh, more on police, uh additional
police items include two
[26:16]
patrol vehicles with fit outs
[26:18]
as well as body cam and patrol car
[26:20]
camera technology upgrades.
[26:23]
Yep.
[26:24]
Your body cams and your cams in your
cars.
[26:29]
Capital purchases planned for public
works include a compressor for road
[26:34]
replacement of the skid steer,
replacement of our six-wheel dump
[26:38]
um and some additional funds for
roadway paving, which we've done for
[26:41]
That's in addition to the liquid
fuels funding I'll talk about in a
[26:45]
Um, as well as the Green Light Go
fiber interconnect project,
[26:49]
which I mentioned earlier is
partially, I think 80% grant funded.
[26:54]
And our parks and preserves.
[26:55]
We've budgeted funding for the
reforestation and meadow restoration
[26:58]
projects at Okahocking Preserve.
[27:00]
Some attachments for that ballfield
groomer that was purchased this year,
[27:04]
um and funding for uh the design of
the Monument Road Neighborhood Park.
[27:11]
Storm water.
[27:13]
Flowing on to storm water.
[27:15]
Uh, we set aside funding here for
[27:18]
storm water planning, engineering,
[27:20]
construction, design and construction
of uh storm water
[27:22]
um facilities, infrastructure in the
township.
[27:26]
So we have proposed expenditures in
2026 of two and a half million
[27:30]
This includes construction of some of
the projects that were designed this
[27:36]
Uh ongoing design and hopefully
construction for the
[27:39]
Spring Road Culvert uh replacement
[27:41]
and funding for the Crum Creek stream
restoration design,
[27:45]
which is uh $70,000 for that.
[27:48]
That's the littlest one.
[27:50]
Liquid fuels I just mentioned.
[27:52]
This is funding from the Commonwealth
that's restricted to
[27:55]
expenditures related to roadways.
[27:58]
It's called liquid fuels because this
is the gas tax.
[28:00]
This is what you pay at the pump.
[28:03]
Um, we have seen this gone down and
we expect we will continue to.
[28:06]
I imagine largely because of EVs.
[28:09]
If there's less gas being sold, less
tax on that gas.
[28:13]
So we'll have to make up for this, uh
particularly when it comes to paving
[28:18]
Uh, the 2020 uh 6 budget includes
total revenue of 382,690.
[28:25]
And total expenditures of $544,000.
[28:28]
Um, this is road salt, traffic signal
street lights,
[28:31]
purchase of one uh public works
vehicle and funding
[28:33]
toward our annual roadway resurfacing
uh program.
[28:36]
We're aiming for three and a half
miles again this year.
[28:38]
Um, in 2026, it's a little more than
we did this year.
[28:41]
That's the $350,000 out of liquid
fuels and the 145 out of the capital
[28:48]
The vehicle we're replacing is a
pickup truck with a plow and a
[28:52]
And that's budgeted at $80,000.
[28:57]
Open space, this is another
restricted fund.
[28:59]
Um, all the expenditures out of this
fund uh must go toward parkland or
[29:04]
The 2026 budget includes a total
revenue of 832,976.
[29:11]
Um, and again that's that's the uh
1/8 of 1% of Willistown residents'
[29:17]
Um as well as some interest earnings
and the expenditures are primarily
[29:29]
We're going to talk a little bit now
about uh some more distinct
[29:36]
All revenue and expenditures related
to sewer go through the sewer
[29:41]
Sewer rates for the two major
districts which are Penn's Preserve
[29:49]
in the proposed budget.
[29:51]
Although by a larger, I'm sorry,
[29:54]
by they're increased by a smaller
percentage than in previous years.
[29:57]
So in other words, we're starting
[30:00]
to get closer to catching up from the
years when the rates were flat.
[30:03]
Um, those particular years
[30:05]
unfortunately did include some years
of high inflation.
[30:07]
So we're still catching up from that.
[30:09]
but while the proposed increases do
exist,
[30:11]
they are again, smaller percentage
wise than in the past couple of
[30:17]
So in the Valley Forge sewer
district,
[30:20]
which is what it says for those of
you in the room underneath
[30:22]
that header that I can't seem to make
go away.
[30:25]
Um, but that's Valley Forge Sewer
District.
[30:29]
We projected deficit in that uh funds
for 2025
[30:31]
in the amount of approximately
$213,000.
[30:35]
Um, that is largely due to the sewer
break
[30:38]
that I mentioned earlier on
Eisenhower.
[30:40]
Like I said, that was offset by some
grant money,
[30:42]
but not in its entirety.
[30:45]
The 2026 budget includes revenue of
uh $4,117,649.
[30:51]
That does not include a margin of
safety for repair and replacement
[30:54]
of existing infrastructure.
[30:57]
More on that in a moment.
[30:58]
Um, expenditures budgeted for Valley
Forge uh sewer total
[31:02]
$4,528,128.
[31:06]
Um, this includes $293,000 in debt
service payments
[31:11]
on the 2025 bond issue.
[31:14]
This also includes a drawdown of cash
reserves of $300,000,
[31:17]
which I'm about to speak about.
[31:19]
So, hold that thought.
[31:21]
But before we get there, let's talk
briefly about Penn's Preserve.
[31:24]
Penn's Preserve is also projected to
see
[31:27]
a small deficit, um, at the end of
2025,
[31:30]
um, of $25,000.
[31:33]
small relative to Valley Forge.
[31:37]
Um, the 2026 budget for this fund
includes revenue
[31:40]
of $202,000
[31:42]
and expenditures of about $204,000.
[31:45]
And again, importantly, this doesn't
include any margin of safety.
[31:48]
In other words, we're not setting
aside any funds
[31:50]
for repair and replacement of
existing infrastructure.
[31:54]
Uh, of course that does keep rates
lower than they would otherwise be.
[31:58]
This budget also doesn't include any
uh plant upgrades
[32:01]
which have been deferred awaiting
grant funds,
[32:04]
including the grant that the board
authorized application for
[32:08]
earlier this evening,
[32:09]
the LSA grant for the Penn's
Preserves uh plant upgrades.
[32:13]
Um, and I'll note that as well,
[32:15]
there's additional significant
upgrades to the lagoons
[32:18]
and the spray irrigation system that
are also on, uh, the horizon.
[32:23]
in the next few years.
[32:26]
We're going to look more specifically
for a moment
[32:29]
uh at sewer rates for the Valley
Forge district.
[32:31]
If you could read that at the top
there,
[32:33]
what it says is Valley Forge sewer
rates, challenges and considerations,
[32:37]
which is what we're going to talk
about.
[32:39]
Before we dive in, let me remind
ratepayers
[32:41]
and those present here tonight
[32:43]
that the fixed rate is based on the
fixed cost to run our our
[32:46]
collection system.
[32:47]
So that's the mains, the pump
station, the personnel, engineering,
[32:51]
that's divided among users.
[32:53]
The usage rate is based on the
charges that the township is
[32:56]
invoiced per gallon.
[32:58]
So that's conveyance via the trunk
line
[33:00]
and treatment at the Valley Forge
treatment plant.
[33:03]
Given the significant costs from the
Valley Forge Sewer Authority
[33:07]
for operation, for their own
infrastructure improvements,
[33:10]
and the continued ballooning costs
for conveyance
[33:13]
through Aqua's Valley Creek trunk
line,
[33:15]
the usage costs for the Valley Forge
district sewer ratepayers
[33:19]
will increase again this year.
[33:22]
This poses some challenges that we
need to consider.
[33:25]
So we're going to look at some
scenarios.
[33:28]
If we include all the expenditures
originally contemplated
[33:31]
in the budget and use those to
determine the sewer rates
[33:34]
for ratepayers in the Valley Forge
Sewer District.
[33:38]
That results in a fixed rate of
172.28 a quarter
[33:44]
and a usage rate of 17.79 per 1,000
gallons.
[33:48]
Or for an average user, the quarterly
payment of $373.63.
[33:54]
For any Valley Forge users in here,
you might realize
[33:56]
for an average user that's an
increase.
[33:59]
It constitutes about a 30% increase.
Obviously that varies.
[34:02]
We use the same average user scenario
in all of these scenarios
[34:07]
so they are all the same,
[34:09]
but your increase may vary depending
on your usage, obviously.
[34:14]
30 almost 30% increase,
[34:16]
Obviously that's really high
[34:19]
and probably untenable for a lot of
sewer users. So,
[34:23]
let's look at another scenario.
[34:26]
What kind of alterations we can can
we make?
[34:29]
Well the first alteration that can be
made is to move some of the
[34:32]
capital purchases that aren't major
projects
[34:34]
but still capital purchases for our
pump stations
[34:37]
into the bond funding rather than in
the fund that uses
[34:42]
the budgetary fund that determines
the rate for the sewer payers.
[34:47]
So in other words, they're going to
be funded by bond proceeds
[34:50]
rather than by the sewer users
directly.
[34:52]
They're indirectly funded by the by
the sewer users via the debt service,
[34:56]
but not straight out of it.
[34:58]
So that moves them out of the
[35:00]
primary Valley Ford sewer fund.
[35:01]
That brings the fixed rate down to
160 35 a quarter.
[35:05]
That average user's quarterly payment
now 361 70 cents
[35:09]
or a 26% increase.
[35:12]
Okay.
[35:13]
What's the next scenario?
[35:15]
How do we decrease rates further?
[35:17]
Well, we can remove the margin of
safety.
[35:18]
Again, that would be the capital
reserve contribution for future
[35:21]
repairs and replacements.
[35:23]
That recommended reserve would have
been 221,000
[35:26]
$260, sorry, $221,267.
[35:32]
So this will bring that fixed rate
down further
[35:35]
to $140.5 per quarter.
[35:37]
Usage rate, obviously stays the same.
[35:39]
This is only affecting the fixed rate
for now.
[35:42]
140 05 is actually
[35:44]
$2 lower per quarter than the 2025
fixed rates,
[35:49]
but that usage rate is still high,
[35:50]
so that's still an increased for an
average user scenario of that 19%.
[35:55]
All right.
[35:56]
Is there anything else we can do?
[35:58]
What else can be adjusted?
[36:00]
The answer here is to draw down on
our cash reserves.
[36:04]
So, our cash reserves currently sit
at a little over a million dollars.
[36:09]
That's been shrinking for the past
six years as we've operated this fund
[36:14]
But if we put $300,000 of those cash
reserves
[36:17]
toward the uh Valley Forge plant
improvement charge,
[36:21]
that brings the usage rate down
[36:24]
to 1576 per 1,000 gallons.
[36:28]
Average quarterly payment, 318 42,
[36:30]
or an increase of a little less than
11% for that average user scenario.
[36:35]
So that's the fourth and final option
[36:36]
we have to present to all those cuts
and alterations,
[36:40]
that's what's included in the 2026
proposed budget for the board.
[36:44]
So after all those changes have been
made,
[36:47]
What is our capital fund for Valley
Forge?
[36:49]
That's fund 20.
[36:50]
What does that look like?
[36:51]
Well,
[36:52]
there's still three major budgeted
projects.
[36:55]
The completion of the 2025 repairs
that Mr. Hagan talked about earlier.
[36:58]
That's the lining section of that
repair,
[37:01]
um, that is going to be pushed in
2026.
[37:05]
That amounts to about 330, excuse me,
$345,000.
[37:10]
Uh, the remainder of the Eisenhower
interceptor project that wasn't
[37:15]
We're hoping that might still be
offset by an LSA grant we applied for
[37:20]
that hasn't been announced yet.
[37:22]
Um, that is budgeted at $800,000.
[37:26]
And the next set of very needed
capital repairs, um,
[37:29]
along Clearview which as Bill noted
was identified as emergent
[37:33]
in this year's televising.
[37:35]
That's estimated about $569,000.
[37:38]
Those are the main projects there in
Fund 20.
[37:40]
Other capital expenditures, the ones
I just spoke about moving to Fund 20,
[37:46]
our pump station equipment and a
lateral camera.
[37:49]
um, which come to about $130,000.
[37:52]
And again, in the proposed budget,
[37:53]
um, moving all of these things into
Fund 20 means that they are funded by
[37:56]
the 2025 general obligation bonds
[38:00]
that are dedicated to sewer
specifically.
[38:04]
Um,
[38:07]
Okay, let's look at Penns Preserve
for a second.
[38:08]
I already mentioned this, I want to
reiterate it.
[38:11]
We're not including any capital
expenditures in the Penns Preserve
[38:17]
But we do know that $275,000 worth of
upgrades
[38:21]
to the treatment plant are needed.
[38:23]
New pumps, new controllers, related
engineering.
[38:26]
That is what the board uh authorizes
this evening to be applied for
[38:29]
in that particular LSA grant.
[38:34]
Rather than budget for that work in a
single year,
[38:36]
which would place that burden
entirely upon
[38:38]
the very limited customer customer
base at Penns Preserve,
[38:42]
um, fewer than 200 customers.
[38:45]
Um, we are seeking grants and
additional funding sources
[38:49]
for these and future repairs.
[38:51]
Um, and again, as proposed, neither
of these funds is setting aside any
[38:58]
That's as proposed in the budget.
[39:01]
Where does that leave our rates?
[39:03]
Here's where that leaves us in terms
of the proposed sewer rates
[39:06]
um in the proposed 2026 budget.
[39:08]
I'll note here at the top.
[39:09]
These are estimates used for
budgeting.
[39:11]
The board adopts rates separately by
resolution in December.
[39:14]
So this is and they could shift a
little bit.
[39:16]
They usually shift a little bit,
[39:18]
um, but not they don't usually shift
a lot.
[39:21]
Um, but if you compare the resolution
to the presentation
[39:24]
from the past couple of years, you
might see a very slight change.
[39:27]
But what's being estimated here is a
fixed rate for Valley Forge of $140.5
[39:33]
$15.76 per 1,000 gallons,
[39:36]
roughly average quarterly payment of
318 and 42 cents.
[39:41]
Penns Preserve,
[39:42]
fixed rate of $253.65 a quarter,
[39:47]
which I think is about a three and a
half to 4% increase
[39:50]
over the 2025 rates.
[39:54]
Oh, I wrote it down. 3.76%.
[39:56]
increase over 2025 rates.
[39:58]
And then as always,
[40:00]
Easttown and East Goshen are uh build
in accordance with the invoices
[40:03]
that we receive from those applicable
neighboring communities.
[40:06]
So we have some small sections of the
township that
[40:09]
flow directly into our neighbors.
[40:11]
Those neighbors bill us and we pass
that on to the
[40:15]
directly to the uh those particular
ratepayers.
[40:20]
All right.
[40:21]
So, we're coming to the end of the
presentation.
[40:24]
But I want to continue to look ahead,
so just indulge me briefly here.
[40:27]
In the years to come, we look forward
[40:30]
to the construction of the monument
in our neighborhood park.
[40:32]
We're hopeful for the acquisition of
the Nike site and conversion uh
[40:36]
to a public park.
[40:38]
We're going to continue our work
through the implementation of our
[40:40]
comprehensive plan,
[40:42]
the upcoming circulation study,
[40:45]
implementation of the stormwater
master plan,
[40:49]
And the final building that's going
to need to be replaced here on the
[40:51]
campus is the police department
garage,
[40:54]
um, which will be replaced at some
[40:56]
point in the coming years as well.
[40:58]
2027 and beyond.
[41:01]
So, thank you all very much.
[41:04]
Thanks to the board and to the
members of the public that were here
[41:06]
for your time and attention this
evening.
[41:08]
The staff here is an incredibly
dedicated group of people, um,
[41:12]
that are very proud to serve the
board of supervisors and by
[41:14]
extension, uh, the constituents of
Willistown Township.
[41:17]
So thank you for the opportunity to
serve.
[41:21]
Hannah, thank you very much. - You're
welcome.