[4:45]
Welcome to the June 28th, 2026 Planning
[4:49]
Commission meeting. If all commissioners
[4:51]
would please mute your microphone until
[4:52]
it is your turn to speak, that would be
[4:54]
appreciated. Members of the public may
[4:56]
join using a PC, Mac, iPad, iPhone, or
[4:59]
Android device. Members of the public
[5:02]
can access the meeting online at the
[5:03]
city's website. The public can ask
[5:05]
questions and provide comments online
[5:07]
during the meeting by using the link to
[5:09]
the virtual meeting to join in
[5:11]
submitting questions via the question
[5:13]
and answer feature within the meeting.
[5:15]
Please include your name and address
[5:17]
when submitting a question or comment.
[5:18]
Questions regarding this meeting can
[5:20]
also be asked during regular business
[5:22]
hours at city hall.
[5:24]
If you are a member of the public and
[5:26]
wish to speak on a topic in person,
[5:28]
please fill out one of the yellow forms
[5:29]
at the back of the room and provide that
[5:31]
sheet to staff. All questions, both
[5:33]
online and in person, will be called on
[5:35]
after the project and reference is
[5:37]
presented. With that, we will call the
[5:39]
meeting to order. Staff, will you start
[5:41]
the roll call, please?
[5:42]
>> Thank you, chair. Jim Gentiel,
[5:46]
>> present.
[5:46]
>> Jake Guzzek,
[5:48]
>> here.
[5:49]
>> Marsha Kennedy,
[5:50]
>> here. John Colllum,
[5:54]
Stephanie Swanson
[5:55]
>> here,
[5:56]
>> Saurin Shaw
[5:57]
>> here,
[5:58]
>> Shay Sebrooks
[6:00]
>> here,
[6:00]
>> Jazelle Parnell
[6:02]
>> here,
[6:03]
>> Rianne Hole
[6:04]
>> here.
[6:05]
>> Chair, we have a quorum.
[6:07]
>> All right. Thank you. The first item on
[6:10]
the agenda is the Bailey West
[6:12]
development comprehensive plan reszoning
[6:14]
and preliminary plat project number 1
[6:18]
19-2025-0000600
[6:23]
and Eric take it away. Thank you, Chair.
[6:27]
Bailey Nurseries has submitted an
[6:29]
application for a comprehensive plan
[6:31]
amendment, a resoning, and a preliminary plat for their project,
[6:35]
which measures approximately 185 acres.
[6:39]
The property is located to the north
[6:41]
side of Bailey Road and to the west of
[6:44]
New Life Academy. The Bailey's own close
[6:46]
to 300 acres spread across Maplewood,
[6:51]
Woodbury, and Newport. Uh the cities
[6:53]
have worked closely together and
[6:55]
collaboratively through the development
[6:58]
review process to evaluate things like
[7:00]
site access, storm water management, and
[7:03]
project timing.
[7:05]
The Bailey master plan was in front of
[7:07]
the planning commission at the previous
[7:09]
planning commission meeting and the
[7:11]
council did approve the master plan at
[7:13]
their June 24th meeting. The uh items on
[7:17]
the screen were a were components of the
[7:20]
master plan. And it is important to note
[7:22]
that one of the modifications that
[7:24]
council gave during the council uh
[7:27]
review and approval of the master plan
[7:29]
was related to the review and future
[7:32]
review of the connection of Century
[7:34]
Avenue. And I'll touch on that a little
[7:36]
bit further, but council did make an
[7:38]
amendment to the master plan that that
[7:40]
connection would be reviewed as part of
[7:42]
the 2050 comprehensive plan
[7:44]
transportation section review as well as
[7:48]
review of uh the adjacent development
[7:50]
review process. So, um the master plan
[7:53]
will now show some dotted lines that
[7:55]
show that that's a future determination.
[7:58]
In front of the planning commission this
[8:00]
evening is a request for a land use
[8:03]
change of our 2040 comprehensive plan.
[8:06]
On the lefth hand side of the screen is
[8:07]
the existing land use which identifies
[8:09]
mixed use and places to work. On the
[8:12]
right hand side is the proposed land use
[8:14]
and you'll see the mixed use is really
[8:15]
kind of wrapping now that public
[8:17]
semi-public use. The public semi-public
[8:20]
use is uh accommodating the future
[8:23]
expansion for sports activities and
[8:26]
recreation activities for New Life
[8:28]
Academy. And so that change would be to
[8:31]
public semi-public from a land use
[8:33]
standpoint. The city of Woodbury
[8:35]
utilizes two findings generally speaking
[8:38]
for to support a change to the
[8:40]
comprehensive plan. Either a mistake was
[8:42]
made designating the property or times
[8:44]
and conditions have changed. In this
[8:46]
case, times and conditions have changed.
[8:49]
Uh, and that is related to the
[8:52]
acquisition by New Life Academy. At the
[8:54]
time of the 2040 plan, it was unknown
[8:56]
that New Life would be looking to make
[8:57]
that acquisition. And with their close
[9:00]
proximity to this, it does make sense to
[9:02]
support a change. Furthermore, the
[9:04]
comprehensive plan does provide guidance
[9:06]
within their guiding principles
[9:08]
regarding promoting excellence in
[9:10]
education. and furthermore that
[9:12]
excellence in education is part of the
[9:13]
core values, quality of life and
[9:15]
identity of Woodbury.
[9:18]
Due to the land use change, a
[9:20]
modification for zoning is also
[9:23]
necessary through the resoning process.
[9:26]
the resoning request uh a chain a
[9:29]
modification to B3 for the retail area
[9:31]
up against Bailey Road and the R4 zoning
[9:36]
for the residential future uh projects.
[9:40]
As you'll see, the area on the far north
[9:43]
continues to be business campus district
[9:46]
and that is because we're not proceeding
[9:47]
with the zoning or land use changes that
[9:50]
would be coming post adoption of the
[9:53]
2050 comprehensive plan. Again,
[9:57]
future development reviews for this
[9:58]
overall project will uh be reviewed by
[10:01]
the planning and commission and city
[10:03]
council um as more information is noted
[10:06]
and as detailed development applications
[10:08]
are made. This approach was previously
[10:11]
utilized in for city place development,
[10:14]
the Benberg gardens and in the northeast
[10:16]
area. So again, in the future, the
[10:19]
planning commission will have the
[10:20]
opportunity likely through either the
[10:21]
site and building plan process, uh
[10:23]
potentially the conditional use permit
[10:25]
process to evaluate things like design,
[10:28]
site flow, parking setbacks,
[10:30]
architectural designs for the individual
[10:32]
projects. That information is not known
[10:34]
as part of this application.
[10:38]
As we look at the prelim preliminary
[10:40]
plat, we'll notice one lot, one property
[10:43]
is being platted into lots and block.
[10:45]
That's for New Life Academy. The others
[10:47]
will be identified in more of a broad
[10:50]
area as outlots and will be replplatted
[10:53]
in the future as project specifics are
[10:56]
known. So there will be a future
[10:57]
platting activity as developments are
[11:00]
reviewed in the future. The pedestrian
[11:03]
movements are very similar to what you
[11:05]
saw in the master plan. Movements along
[11:07]
Century Avenue from a trail standpoint
[11:10]
as well as sidewalk connections
[11:12]
throughout the future development areas.
[11:15]
Uh as a reminder to the planning
[11:17]
commission uh within the master plan, it
[11:20]
did identify that additional connections
[11:22]
from a sidewalk standpoint would occur
[11:23]
in the future retail area and likely in
[11:26]
within the future multifamily to connect
[11:28]
to these pedestrian spines that run
[11:31]
along the future private drive and
[11:32]
Century Avenue.
[11:37]
As identified previously, this is a
[11:38]
multi-phase project with the first phase
[11:41]
including site grading, utility
[11:43]
construction, and the construction of a
[11:45]
portion of Century Avenue that's shown
[11:47]
in the the box on the screen or the
[11:50]
dashed box on the screen. So, the
[11:52]
Century Avenue would only be constructed
[11:54]
to that point at this time. And again,
[11:56]
as directed by the city council, further
[11:59]
evaluation would occur on Century
[12:02]
Avenue, further to the north of that as
[12:03]
part of the 2050 comprehensive plan
[12:05]
process.
[12:07]
A regional storm water approach uh is
[12:11]
provided as part of this application.
[12:13]
The largest basin is to the west of
[12:15]
future Century Avenue or the alignment
[12:18]
of that roadway. Again, Sentry would
[12:20]
terminate in this location that will
[12:23]
provide the vast majority of storm water
[12:25]
management for the site. You'll notice a
[12:27]
small basin. This is more of an interim
[12:28]
basin to uh address storm water flows
[12:31]
through the site in advance of
[12:32]
development of the residential area to
[12:34]
the north in the future. Also shown the
[12:37]
third area is on the existing New Life
[12:40]
campus and some light grading that's
[12:41]
occurring. That's to prepare for future
[12:43]
expansion and it allows for an efficient
[12:46]
construction as well as managing some of
[12:48]
the um excess material on site and
[12:51]
allowing for for balancing of material
[12:54]
uh throughout the site area from a
[12:55]
grading standpoint.
[12:58]
There are a number of access points that
[13:00]
are designed to meet the needs for this
[13:02]
improvement. A detailed traffic study
[13:04]
was conducted as part of this project.
[13:07]
There will be some level of
[13:08]
signalization at access point B uh as
[13:12]
reviewed and approved by Washington
[13:13]
County as well as turn light
[13:15]
improvements. There's a secondary access
[13:17]
that will serve the uh future uh
[13:20]
industrial park with located within the
[13:22]
city of Newport located at access point
[13:25]
A. Access point C is a private drive
[13:28]
connection to the existing New Life can
[13:31]
uh campus. Access point D again is the
[13:35]
terminus of those phase one
[13:36]
improvements. It is identified within
[13:38]
the master plan that there is a
[13:40]
connection at Chamberlain Road as part
[13:42]
of access point F. That would be
[13:44]
carefully designed to ensure that this
[13:46]
is a connectivity connection, not uh a
[13:49]
throughway into Chamberlain. So really
[13:52]
looking at connectivity versus moving
[13:54]
traffic through the community. And
[13:56]
again, not to be redundant, but it is
[13:58]
important for the record to identify
[14:00]
that the improvements within A or area E
[14:03]
uh will be evaluated through that 2050
[14:06]
plan and is not identified at this uh
[14:08]
time to be constructed with this review.
[14:12]
And with that, staff recommends approval
[14:13]
of the comprehensive plan amendment
[14:15]
resoning and plunary plat for the Bailey
[14:17]
West project. and the applicant is on
[14:20]
hand for any questions.
[14:23]
>> Would the applicant like to add anything
[14:24]
at this time?
[14:31]
» Hi, uh Mark Kick of Alliance
[14:32]
Engineering. Um glad to be here. Um want
[14:36]
to thank staff for all their help with
[14:38]
everything getting us to this point. We
[14:39]
have a number of team members here to
[14:41]
field any questions you have, but
[14:43]
nothing to add right now. So, thank you
[14:45]
though.
[14:48]
All right, thank you for being here. I
[14:50]
do have a couple of yellow sheets. Sorry
[14:53]
if I mixed up the order. We're going to
[14:55]
start with Miss Ellen McPartland.
[15:00]
I hope I pronounced that right.
[15:03]
Please just go ahead and state your name
[15:04]
and address when you get up to the
[15:06]
podium.
[15:13]
Hello, my name is Alan McPartland. I'm
[15:17]
owner of 1135 Century Avenue South. Um,
[15:21]
a 2acre property and home for the last
[15:24]
eight years. Um, I moved here after
[15:27]
living out of state and I was previously
[15:29]
a Lowertown St. Paul resident where I
[15:32]
actually led their Lowertown master plan
[15:34]
task force which passed through the St.
[15:37]
post city council and during your
[15:40]
planning commission meeting this evening
[15:41]
I want to remind you and urge you to in
[15:44]
tonight's discussions and more
[15:47]
importantly in the future to remove the
[15:49]
second phase of Century Avenue South
[15:51]
expansion of your on your plans and in
[15:54]
your discussions um in Woodbury's you
[15:57]
know as Eric mentioned uh in Woodberry's
[15:59]
June 24th city council meeting they were
[16:02]
unified in and responsive in putting a
[16:06]
dis distinct pause and clause on that
[16:09]
road extension. All debated on the city
[16:12]
council and deliberately deliberately
[16:14]
called this portion out as not approved
[16:17]
until further deliberation and study for
[16:19]
the 2050 plan. This topic resulted in a
[16:23]
lengthy 10-minute discussion of the
[16:24]
Woodbury City Council at that meeting.
[16:28]
Um just one moment. Um there we urged
[16:32]
them not to approve the 2040 master plan
[16:35]
to include the Century extension pushing
[16:37]
through to the road on Century without
[16:40]
additional studies. Traffic, noise,
[16:41]
pollution, runoff studies were
[16:44]
insufficient, we believe, um and not
[16:46]
considering specifics of the area.
[16:48]
Carver Lake is protected water under the
[16:50]
Minnesota DNR designation 820166P,
[16:54]
I believe, and other factors. we were
[16:56]
successful uh in the removal of that
[16:59]
reference. Uh so thank you to the city
[17:02]
council for that and I just want to make
[17:04]
sure that is uh clearly stated by the
[17:07]
community. So re to reiterate we haven't
[17:10]
heard a lot of discussion or plan
[17:12]
activities in concrete terms probably
[17:14]
because of the timing but of the
[17:16]
alternative streets to century avenue
[17:18]
south uh the second phase um except on
[17:21]
the city council meeting. So, I urge the
[17:23]
planning commission to continue to more
[17:25]
deeply consider these issues in the
[17:27]
future. And if that's the 2050 plan,
[17:30]
then that's that's so be it. But, uh,
[17:33]
traffic and noise and safety are an
[17:35]
issue on that street. And anyone who
[17:37]
goes down it would would agree. Um, this
[17:40]
is one of my biggest concerns and a game
[17:42]
changer for everyday lives in the area
[17:44]
for lake visitors and for residents. all
[17:47]
and more importantly protecting the
[17:49]
long-term health of Carver Lake. The
[17:51]
pollution, the runoff, erosion, Carver
[17:53]
Lake is that in that designated
[17:55]
protective water area, traffic pollution
[17:58]
negatively impacts the lake through
[18:01]
atmosphere, storm water runoff,
[18:03]
shoreline disturbance. Our lake is
[18:05]
already vulnerable to blue algae and
[18:08]
chlorides. It's a small lake and along
[18:10]
with noise pollution, the atmosphere of
[18:13]
the area and the health of our lake can
[18:15]
change drastically over time. So, please
[18:18]
continue to keep this in mind uh for the
[18:20]
good of the project. Century Avenue
[18:22]
South land use and more most
[18:24]
importantly, Carver Lake. Thank you for
[18:27]
your time and consideration.
[18:30]
>> Thank you, Ellen. Next, we're going to
[18:33]
hear from Roger Anderson.
[18:48]
Good evening. Thanks for the meeting,
[18:51]
letting people know about it. There
[18:52]
wasn't a lot of notice
[18:55]
previous. I just got my first notice.
[18:58]
Oh, uh
[19:00]
the last meeting they had, I got it in
[19:02]
the mail that day for this meeting was
[19:04]
which was what? Friday, Thursday,
[19:05]
whatever it was. So, not a lot of uh for
[19:10]
notice for the people on the road and I
[19:13]
think only a few of us got the letter a
[19:15]
few in Woodbury. Me, cuz I border it,
[19:18]
first address in Maplewood.
[19:21]
So, all the people down around Central
[19:23]
Avenue, nobody had any notice or sent
[19:27]
any letters. Nobody. Ramsey County
[19:29]
obviously is on deaf ears in Maplewood.
[19:32]
But I haven't seen anybody or heard from
[19:34]
anybody in Maplewood showing up to these
[19:37]
meetings. They weren't in the ones in
[19:39]
Newport and they apparently don't really
[19:41]
care that much about what's going on
[19:43]
with this. But this option of Centure
[19:46]
Avenue is they had a planner here at the
[19:50]
meeting. She said it's not a viable
[19:52]
thing. It's there's no way to widen the
[19:56]
street or put sidewalks. You're right on
[19:58]
the lake once you get to the bottom of
[20:00]
the hill.
[20:02]
going up to the park is a
[20:05]
really steep grade and wintertime
[20:09]
you may have a truck go down that in the
[20:11]
winter time. They never come back and go
[20:14]
try to go up it or down it. There's
[20:16]
always cars
[20:19]
stuck there. They abandon them. They
[20:21]
leave them in the winter time up against
[20:24]
the guardrail. If you don't have
[20:25]
four-wheel drive in the winter time, if
[20:27]
it's snowing, you're not going up that
[20:29]
hill. It's plowed by the county. Mc
[20:32]
Knight, Carver Avenue, and Century.
[20:35]
That's Ramsey County plows that, not
[20:37]
Woodbury and not Maplewood. So, it's the
[20:41]
farthest street county property road in
[20:44]
Ramsey County. So, the counties in Shore
[20:47]
View. Well, what do you think gets
[20:49]
plowed last? That stretch. So, it's
[20:53]
pretty I've lived there for 26 years, so
[20:56]
I've seen a lot of what's goes on. the
[20:58]
kids racing around the lake, which is
[21:00]
pretty dangerous. It's a beautiful road
[21:02]
to drive with a motorcycle or a hot rod
[21:06]
or whatever,
[21:08]
but it's very dangerous down by the
[21:10]
lake. It's super dangerous.
[21:14]
There's two really good viable options,
[21:17]
which are northeast corner, which is
[21:20]
Jordan Drive, and Carver Park Drive.
[21:24]
They go right through your park. Sure,
[21:27]
you can run a road right through there
[21:28]
and hook up four lanes. You don't have
[21:30]
to worry about blind driveways and a
[21:32]
steep hill to go up and down in the
[21:35]
winter time. And obviously, you got the
[21:37]
Chamberlain, but there's two more roads
[21:39]
up there to the northeast that are
[21:42]
certainly viable. The one Carver Park uh
[21:45]
place or drive that comes in, there's a
[21:47]
path that goes right underneath the high
[21:49]
tension lines and goes into the bark.
[21:51]
There's only two trails there that would
[21:53]
be in affected by it. And that would
[21:56]
come out in that northeast corner.
[21:59]
Jordan Drive and Carver Park Drive are
[22:03]
right there. And there's nothing in that
[22:05]
side of the park. It's all heavily
[22:07]
wooded. Don't think people really care
[22:10]
to walk there cuz it's so dense. It's
[22:12]
pretty creepy, actually. So, it's a
[22:15]
great area to clear out, open it up a
[22:17]
little bit, put some paths, walking
[22:19]
paths and stuff on both sides. put a
[22:22]
sight a pedestrian bridge to go
[22:24]
underneath the road just like they have
[22:26]
for their roundabouts out on Bailey and
[22:29]
13 and put a couple vitox through and
[22:33]
let the traffic over the top and it will
[22:35]
solve your problem. And then on Lake
[22:38]
Road,
[22:39]
it's four lanes. Put your stop lights,
[22:41]
street light there and stop stop lights
[22:43]
there and you have you're not
[22:45]
interfering with any houses because
[22:46]
there are no houses there. There's like
[22:48]
a 100 foot parcel on either side of the
[22:50]
road. There's nothing there except the
[22:53]
path going down into the park. And it's
[22:55]
not heavily. Most people drove to that
[22:58]
park. They drive and go into the park.
[23:00]
They don't walk to the park. So that's
[23:03]
just me. The concerns with the century
[23:05]
is that's crazy. It's just no way you're
[23:09]
running car traffic and semitrs
[23:12]
especially. The road's so beautiful
[23:14]
because there's no trucks on it other
[23:16]
than a garbage truck or somebody doing a
[23:18]
construction project. There's no
[23:20]
semi-traffic there with trailers. So,
[23:22]
it's it's crazy. It's just easy out
[23:25]
because you're only 300 ft from the
[23:29]
property via an easement to get to the
[23:32]
road. So, it's a it's an easy out.
[23:34]
That's what it is. But, it's super
[23:36]
dangerous both ways. You go down the
[23:38]
hill, there's a retaining pond. Me and
[23:41]
my wife helped. A handicap van slid out,
[23:45]
went over the side and down off to the
[23:47]
side almost into the pond. We had to
[23:49]
stop one winter day and help them get
[23:52]
him out of the van and wait for uh
[23:54]
Maplewood paramedics and stuff to come
[23:56]
to get them. So both ways, super
[23:59]
dangerous road in the winter time or
[24:01]
even if it's raining hard. So it's uh
[24:05]
not a good option. So, thank you and
[24:09]
good luck. Whatever you whatever you
[24:12]
plan, even 2050 still crazy. You don't
[24:16]
have you don't have the room
[24:19]
for traffic to around that lake. Just go
[24:21]
up there and drive it in the winter time
[24:22]
when it snows 4 in. Go try and drive up
[24:24]
that hill when it's snowing and see how
[24:26]
you do.
[24:27]
>> Thank you, Roger.
[24:28]
>> You won't you won't get up there.
[24:29]
Thanks.
[24:31]
>> We have one more yellow slip from
[24:33]
Janelle Ericson.
[24:38]
Once I turned 40, I needed these reading
[24:40]
glasses. Okay. Um, hi, good evening. My
[24:42]
name is Janelle Ericson and I live on
[24:44]
Century Avenue South as well at 1160.
[24:47]
Um, I actually I might have Roger Bead.
[24:50]
Um, my parents bought that house in 1973
[24:52]
and um I turned around and bought it a
[24:56]
few years ago, so it's been a while. Um,
[24:58]
first of all, I'd like to thank you all
[25:00]
for um all the time and effort that's
[25:02]
gone into planning this development. Uh,
[25:04]
I understand this is very significant
[25:07]
and I also understand that growth is of
[25:09]
course a part of Woodbury's future. Um,
[25:11]
again, when I was a kid, we had Valley
[25:12]
Creek Mall and that's it. So, I'm not
[25:15]
here tonight to oppose this development,
[25:17]
but I am here to ask you to preserve the
[25:21]
city's flexibility regarding this
[25:22]
specific issue and Century Avenue South
[25:25]
and that potential extension. So, like
[25:27]
Alan mentioned at last week's city
[25:29]
council meeting, uh several residents
[25:31]
expressed concerns about using that as a
[25:33]
primary connection into the future uh
[25:35]
northern development in phase 2. I
[25:37]
watched it on YouTube while I was out of
[25:39]
town attending a work conference and I
[25:42]
saw that council members were open to
[25:44]
exploring alternative access routes. Um
[25:46]
and I appreciate the willingness to
[25:47]
continue that conversation. And as I
[25:50]
read tonight's packet, one statement
[25:51]
stood out to me.
[25:53]
It says that the development of the
[25:55]
northernmost residential area will not
[25:56]
occur until, as Eric said, until further
[25:59]
review as part of the 2050 comprehensive
[26:01]
plan process.
[26:03]
And so, if that area is already being
[26:04]
deferred for future planning, I
[26:07]
respectfully ask, why do we want to just
[26:10]
keep it on the map anyway? So, since the
[26:12]
city council has already expressed uh an
[26:15]
interest in exploring alternatives, I'm
[26:16]
just asking that this plan leave room
[26:18]
for that conversation to continue. Um I
[26:22]
and my neighbors are concerned that once
[26:25]
a roadway appears on this um uh and in
[26:29]
an approved preliminary preliminary
[26:32]
plat, it becomes much more difficult to
[26:35]
consider alternatives later.
[26:38]
So you know, I'm not asking you to
[26:40]
decide where the road should go tonight.
[26:42]
I'm just asking you not to decide that
[26:44]
it has to go there. So please remove
[26:47]
your dotted line. I can't tell if it is
[26:49]
or not because of my terrible eyes, but
[26:52]
um respectfully um you know, please
[26:54]
remove that potential Century Avenue
[26:56]
extension from the preliminary plat or
[26:59]
make any future extension contingent
[27:01]
upon a comprehensive transportation
[27:03]
alternatives analysis as part of that
[27:05]
plan process in 20 for 2050. Um, I
[27:08]
believe that approach supports both
[27:10]
responsible growth and good planning
[27:12]
like you guys are all so thoughtful
[27:14]
about um, in the city of Woodbury
[27:18]
and it allows this development to move
[27:19]
forward while preserving the city's
[27:20]
ability to make the best long-term
[27:22]
decision for everyone. And I hope you
[27:24]
all stayed cool today. Carver Lake Beach
[27:25]
was very crowded and um, yeah, maybe
[27:29]
some of you went swimming. So, go enjoy
[27:31]
the park and thank you for your time and
[27:32]
consideration.
[27:35]
>> No, you receive any Any online?
[27:40]
>> Forgot the button. Did we receive any
[27:43]
online comments?
[27:45]
>> Not at this time, chair.
[27:46]
>> All right, let's open it up to
[27:49]
commissioner comments. And I didn't get
[27:51]
a chance to ask before the meeting, but
[27:53]
our student commissioners are often at
[27:55]
the end. Would you like to go first
[27:57]
today?
[28:03]
» Be bold.
[28:06]
>> All right. Commissioner Hole, go for it.
[28:10]
>> Well, okay. So, looking through
[28:14]
the plan, what is the expected timeline
[28:17]
for each phase of the development?
[28:22]
» Yeah, generally speaking, we do not have
[28:25]
timelines for the development
[28:26]
activities. Uh we do do not have any uh
[28:30]
active development applications in right
[28:33]
now. Uh we are beginning conversations
[28:37]
with me bring up a different plan here.
[28:44]
Uh with some of the multifamily
[28:46]
developers to the north on this area. So
[28:49]
that could begin development as soon as
[28:51]
2027. So next year there was also some
[28:54]
initial conversations on some of the
[28:57]
multifamily apartment you users. So
[28:59]
again that could be 27. The retail has
[29:02]
been uh to the market for some time and
[29:05]
again that could also so from a
[29:07]
expectation side we would expect pending
[29:10]
approval by the planning commission and
[29:12]
city council that land disturbance
[29:15]
grading activities uh sewer and water
[29:18]
activities could occur this summer but
[29:22]
development work would anything going
[29:24]
vertical would likely the earliest would
[29:26]
be 2027.
[29:30]
» Okay. I have no further questions.
[29:33]
>> Thank you, Commissioner Parnell.
[29:36]
>> I also just have one question. Um, as
[29:39]
the future retail area develops, um, is
[29:43]
the city looking for businesses that
[29:45]
primarily serve like the surrounding
[29:46]
neighborhood or is the goal to attract
[29:49]
businesses that bring people from
[29:50]
outside the area as well?
[29:53]
>> I think what uh the ultimate goal and
[29:55]
what likely the market will provide are
[29:57]
the same. And so based on kind of where
[29:59]
this is in the community, it's likely to
[30:01]
be a service retail center. So more
[30:04]
serving the local area, the residential
[30:07]
property both to the north and the south
[30:10]
um within the southern portion of
[30:12]
Woodbury and also those that are
[30:14]
utilizing the Bailey Road corridor are
[30:16]
the likely um users of this retail area.
[30:19]
>> Okay. Yeah. No further questions.
[30:23]
>> All right. Thank you. We're going to go
[30:24]
this way this time. Commissioner C.
[30:27]
Brooks.
[30:29]
>> Thank you, Chair. Um, I'll make it easy
[30:30]
today. I feel like a lot of my questions
[30:32]
were actually answered at our last
[30:33]
meeting, um, when we discussed this
[30:35]
plan. Um, so I actually have no
[30:36]
questions at this time.
[30:38]
>> Easy enough. Commissioner Shaw.
[30:42]
>> Thank you, Chair. Um,
[30:44]
uh, a lot of questions were answered
[30:46]
last time, but there was some new things
[30:48]
that I actually saw in here, and so I'm
[30:51]
going to ask with respect to that. So, first question I actually had is um
[30:57]
you know if you can put up the existing
[30:59]
zoning versus proposed zoning the
[31:01]
sideway there we go. Uh so my first
[31:04]
question was the the the part which is
[31:08]
that low density housing you know uh
[31:11]
outlot D u u portion why is it actually
[31:16]
being asked for being designated as BCD?
[31:20]
So all lot B is not being proposed to be
[31:23]
reszoned at this time. It continues to
[31:25]
be the same zoning as it currently is.
[31:27]
And business campus district would be
[31:29]
the appropriate places to work land use
[31:31]
for the intended light industrial um uh
[31:35]
building projects that uh are
[31:37]
contemplated within the master plan.
[31:39]
>> The reason I ask is because then if you
[31:41]
look at right below that at least in the
[31:44]
printed page that we got the outlaw D
[31:46]
calls out as future residential.
[31:49]
So is that you know just asking if
[31:52]
that's conflict uh you know because you
[31:56]
outlaw D is called out as future
[31:57]
residential but then it shows up as BCD.
[32:01]
Yeah, outlaw D will within the master
[32:04]
plan is identified to be recommended to
[32:07]
be residential, but at this time we are
[32:10]
not recommending to change the
[32:14]
um zoning of the future residential area
[32:17]
until after the 2050 comprehensive plan
[32:19]
process. So the sequencing would be the
[32:21]
land use would be reviewed as part of
[32:23]
the 2050 plan and then zoning would
[32:25]
change from business campus district
[32:26]
likely to R4 after that process is
[32:29]
complete. So the proposed use is
[32:31]
something to be kind of for the future
[32:33]
and we are just talking about the the
[32:36]
designation of zoning at this point.
[32:38]
>> That's correct.
[32:39]
>> Okay. Thank you. Um did have a question
[32:44]
somewhat related to that is you know you
[32:47]
have uh in the preliminary plat
[32:49]
paragraph um you're talking about um
[32:53]
that there will be a regional storm
[32:55]
water pond will be constructed by the
[32:57]
developer but it will be owned and
[32:59]
operated by the city in some of the
[33:01]
other you know pieces that we have
[33:04]
reviewed before that's kind of similar
[33:07]
to to what we have reviewed before uh
[33:10]
except One thing I thought was maybe
[33:13]
missing maybe not or implied here is
[33:15]
it's not just operated by the city and
[33:18]
it's actually constructed by the
[33:19]
developer but there would be something
[33:21]
that the developer actually pays for a
[33:23]
certain number of years right for the
[33:25]
city to actually do the the operation or
[33:28]
the maintenance.
[33:30]
Generally speaking, the only area where
[33:31]
the developer will have a longer term
[33:33]
commitment is on vegetation management.
[33:36]
And we have not gotten to that point
[33:38]
within our discussions with the
[33:40]
developer on whether we will accept the
[33:42]
pond after that work has been completed
[33:44]
or whether it'll get turned over the
[33:46]
city with some level of financial
[33:48]
contributions to complete that work
[33:50]
>> because you don't have a developer yet.
[33:52]
Is that the point?
[33:53]
>> We do have a developer. We just have not
[33:55]
proceeded to those conversations yet.
[33:57]
But there are there are two solutions
[33:58]
that we've successfully utilized on a
[34:00]
number of developments. Again, whether
[34:02]
it's the contribution for future uh
[34:06]
establishment of the the turf around the
[34:10]
ponding area or the other alternative is
[34:13]
that it's not deed until that's uh
[34:15]
satisfactory to the city.
[34:17]
>> Okay. Thank you. And um one more
[34:22]
question is uh when you go to the um uh
[34:27]
the access points um right that one um
[34:32]
you know one of the questions I had is
[34:34]
uh you said that there was a traffic
[34:36]
study done by the city and and there
[34:39]
would be some kind of intersection
[34:41]
planned between you know that point B
[34:43]
which is the Century Avenue and Bailey.
[34:46]
Um you know I think the there is already
[34:50]
a signal light intersection which is you
[34:52]
know Bailey and Military
[34:55]
right so so has as part of the traffic
[34:59]
study uh was it actually assessed as in
[35:02]
the distance between the two? Um, okay.
[35:05]
>> Yeah, absolutely. Washington County, uh,
[35:07]
is very involved in the planning and one
[35:10]
of their main areas of involvement, it
[35:13]
relates to access management for all of
[35:16]
the existing and planned intersections
[35:18]
along their corridor. So, the accents,
[35:21]
both access point A and B meet the
[35:24]
county's access um, management
[35:26]
guidelines
[35:28]
>> because the the military would be it's
[35:30]
actually essentially, you know, west of
[35:32]
A. Correct. Okay.
[35:36]
All right. That's that's all I had.
[35:37]
Chair.
[35:39]
>> Thank you,
[35:40]
>> Commissioner Kennedy.
[35:41]
>> Thank you, Chair. Um, Commissioner Shaw
[35:44]
took several of my questions. Appreciate
[35:46]
that. Um,
[35:49]
that's all right. Um, one thing is clear
[35:52]
with all this work, your team doesn't
[35:53]
sleep much, do they?
[35:55]
Um this uh on page 35 of the larger um
[36:02]
packet that we got um this may be in the
[36:06]
same vein and maybe have already been
[36:09]
discussed the intersection there with
[36:12]
century and um
[36:16]
on the on the legend at the lower left
[36:19]
talks about a three-leg intersection a
[36:21]
four-le intersection and is that it's a
[36:24]
simple question and uh um just wondered
[36:28]
here it looks like there's only going to
[36:29]
be a three-legg intersection which I'm
[36:31]
sure is enough. Is there it was this
[36:34]
legend just explaining it wasn't
[36:35]
projecting was it at all?
[36:37]
>> Yeah, it's just identifying what the
[36:39]
environment is. The the reason it's a
[36:40]
three-legged intersection is it's not
[36:42]
currently identified that Century will
[36:44]
be extended to the south within that
[36:45]
location. So that makes that
[36:47]
three-legged for the intersection of
[36:49]
Century and and Bailey Road.
[36:50]
>> And that's that's actually what it is
[36:52]
now. Kind of
[36:53]
>> that's correct.
[36:53]
>> Good. on page 36 about the retaining
[36:56]
walls and erosion. It looked quite hilly
[36:58]
of course with all the pond areas and
[37:00]
then there are some hills there. Um the
[37:02]
retaining walls and and erosion. Just a
[37:06]
quick question about that. It's um um I
[37:09]
think in any of the projects that we
[37:12]
um engage in Woodbury, it's an ongoing
[37:17]
u tracking of that erosion. um is that
[37:24]
there's some work that needs to be done
[37:26]
before any of the development happens
[37:28]
and I know that's going to be starting
[37:30]
soon by each of the three um cities
[37:33]
involved in in their own area. That is
[37:36]
that right Eric?
[37:37]
>> Yeah. The the first step of the
[37:39]
development process will be the issuance
[37:41]
of a land disturbance permit. The land
[37:43]
disturbance permit governs the erosion
[37:46]
and sediment control requirements. We as
[37:48]
a city we have uh conditions within that
[37:51]
permit. We also collect security to
[37:53]
ensure that there is not erosion. We as
[37:56]
a also collect a security for on-site
[37:59]
inspections to occur. So there are
[38:01]
regular inspections of the site to
[38:03]
ensure compliance throughout the
[38:04]
duration of construction.
[38:06]
>> And does each city do that for their own
[38:09]
portion?
[38:10]
>> That is correct.
[38:10]
>> Okay. All right. I I figured that but I
[38:12]
was I just wasn't sure. Is there an
[38:14]
overall project manager or each city has
[38:18]
their own project manager?
[38:20]
>> Each city will have their own project
[38:21]
manager, but as um it's certainly been a
[38:24]
collaborative effort with all of the
[38:26]
different members from each city and and
[38:28]
we'll continue to have those dialogue.
[38:30]
will there is an overall
[38:33]
uh construction team from the private
[38:35]
development side that city staff will be
[38:38]
working closely with and we've been
[38:39]
having joint calls for several months
[38:42]
together and I would anticipate that to
[38:44]
continue as we get into the construction
[38:45]
phase.
[38:46]
>> That's frankly to me the most exciting
[38:48]
part about this is that the the
[38:50]
collaboration of the three cities and I
[38:52]
think that's terrific. on page 53
[38:57]
of the about New Life Ponds and some of
[39:00]
the different things that New Life is
[39:03]
going to be doing. Um on page 53 talks
[39:07]
about the new life pond. Um is that coming or going? Is that a new pond there? I know that some of the
[39:17]
ponds are being eliminated and some are
[39:20]
being is it Eric? Is it that some are
[39:22]
being engaged or started?
[39:24]
>> Yeah, there's additional ponding, both
[39:26]
infiltration and quantity ponding that's
[39:28]
proposed to be constructed on the
[39:30]
screen. It's highlighted within this
[39:32]
blue circle and that
[39:34]
>> it's actually not on the screen.
[39:37]
>> You got
[39:41]
Okay. Um, can the cable caster?
[39:49]
» No, there's two people in there.
[39:54]
We're having technical difficulties with
[39:55]
the audio on the virtual meeting. So,
[39:57]
that's why
[40:06]
hopefully we're moving that way.
[40:17]
Is a cablecaster able to show the
[40:20]
desktop?
[40:26]
I can do this from the planning
[40:27]
commission report while we weigh.
[40:30]
>> I lost.
[40:31]
>> Fair enough. I can go into the planning
[40:32]
commission staff report and the same
[40:34]
graphics are within that document. So,
[40:37]
if you go into page five of the planning
[40:39]
commission staff report within that
[40:41]
storm water management paragraph, the
[40:43]
ponding area on the right side, the
[40:46]
smaller basin just south of the existing
[40:49]
buildings is proposed to be new.
[40:56]
» Okay. And that's it. It's not just um
[41:01]
for looks. This is for this is a um
[41:04]
actually facility in the area.
[41:06]
>> That is correct. This would be um a
[41:09]
little in advance of future improvements
[41:11]
that the new life is working on right
[41:14]
now. Um they're not to the position or
[41:17]
point where they made enough site
[41:18]
decisions, but there's a lot of
[41:19]
efficiencies that can be gained by
[41:21]
constructing those now as part of
[41:23]
there'll be a lot of site activity just
[41:25]
happening to the west. So cording
[41:26]
coordinating those a e efforts together
[41:28]
is a very effective approach.
[41:30]
>> Okay. All right. Good. That's all I
[41:32]
have. Sher.
[41:34]
>> All right. Thank you, Commissioner
[41:35]
Guzzk.
[41:38]
>> Thank you, Chair. Um had a couple
[41:41]
questions on um like condition recommend
[41:43]
on your recommendation letters. Uh
[41:45]
condition one, it references the PUD and
[41:48]
CUP approval. Does that does that mean
[41:50]
there for sure will be a PUB and and CUP
[41:55]
for these future parcels or what is
[41:58]
>> Yeah, it it is likely that there'll be a
[41:59]
plan unit development in a future CUP
[42:01]
and that's just putting in reference
[42:02]
that as those come they'll have a
[42:03]
one-year expire expiration.
[42:05]
>> Got it. Okay. Um
[42:12]
yeah, same thing with like condition
[42:14]
eight. We reference odor suppression
[42:16]
equipment for all restaurant uses. Is
[42:18]
that kind of just the in case future
[42:21]
>> Exactly. early indication as they're out
[42:23]
to market in advance of approvals. This
[42:26]
is the first approval and we want to
[42:27]
make sure with any future purchase
[42:28]
agreements or other that it's clearly
[42:30]
listed.
[42:31]
>> Okay. Um and my other question was so
[42:35]
we're
[42:36]
it's noted as mixed use in the land use
[42:40]
map is noted as mixed use. Why you can
[42:44]
explain a little bit why we aren't just
[42:46]
designating it mixeduse zoning as well.
[42:50]
>> The mixeduse zoning allows for both
[42:52]
commercial and residential. So from a
[42:54]
zoning standpoint because the master
[42:57]
plan identifies the area in yellow as a
[42:59]
residential project. We wanted to be
[43:01]
consistent with the master plan. So the
[43:03]
R4 designation delivers a multifamily
[43:06]
project. The B3
[43:09]
delivers that retail that's identified
[43:11]
within the adopted master plan.
[43:13]
>> Okay.
[43:13]
>> They're more specific.
[43:15]
>> Got it. Um
[43:18]
I guess my other question was so I was
[43:20]
digging through the city ordinances and
[43:22]
I don't know if this is just a if it's
[43:24]
an issue or not, but I noticed that the
[43:26]
B3
[43:27]
zoning requires um a 20 acre parcel
[43:32]
and I believe this outlot is proposed to
[43:35]
be 15 acres. So is that an issue at all
[43:37]
with
[43:38]
>> part ordinances
[43:39]
>> as part of the future? This is being
[43:41]
platted as an outlaw. As part of the
[43:42]
future platting, there will likely be
[43:43]
some things through the planned unit
[43:45]
development process to address the
[43:47]
overall size of the projects.
[43:49]
>> Okay. Um and then with Washington County
[43:52]
in particular, since we are kind of
[43:55]
setting it up for them to take over if
[43:57]
it does eventually connect, I noticed
[43:59]
we're also putting a bunch of city
[44:01]
utilities down. the potential extension.
[44:05]
Has the county
[44:07]
commented at all about the city
[44:09]
utilities within their potential future
[44:11]
right away?
[44:13]
>> We have certainly been in close contact
[44:14]
with Washington County is throughout the
[44:16]
design of this project including the
[44:19]
location of where the utilities would be
[44:20]
within the public right of way. Um they
[44:22]
also have full plat review. So they have
[44:25]
the ability to review the plan sets uh
[44:27]
and make comments as well.
[44:29]
>> Okay. And then similarly on the the
[44:33]
private road at the first intersection
[44:36]
come off a century. So it' be between
[44:39]
the it would be north of the future
[44:40]
retail and south of the school
[44:44]
expansion. See that? Sorry. I
[44:47]
>> Well, I guess the question is has there
[44:49]
been a discussion of that being a public
[44:50]
road versus a pilot road? There's also a
[44:52]
city utilities I believe.
[44:53]
>> Yeah, I will go back into the planning
[44:55]
commission staff report for visibility.
[44:57]
So this page five uh the access point
[45:00]
graphic um the commissioner is asking
[45:03]
regarding access point C and the roadway
[45:05]
that connects back to the west toward
[45:07]
Century.
[45:09]
Uh we did evaluate whether that should
[45:11]
be a public or private. But when we
[45:13]
looked at the the ability where the
[45:16]
letter C is located, if that were a
[45:18]
public street, we would need to install
[45:20]
a culde-sac in that location for the
[45:22]
snowplow services to turn around. and
[45:24]
that took a significant amount of land
[45:26]
area versus the ability for a private
[45:29]
street to connect directly into the
[45:31]
basically the parking area of New Life.
[45:33]
They can then work together as private
[45:35]
entities to conduct snow removal. So in
[45:38]
order to conduct public activities
[45:40]
there, it was a significant amount of
[45:43]
additional land within that area. The
[45:45]
second area is there's more right ofway
[45:47]
that's necessary and then the setbacks
[45:49]
are calculated off of that right ofway
[45:50]
as well. So it had a pretty significant
[45:53]
impact on the developability by moving
[45:55]
that to a public street versus private.
[45:57]
>> Okay. Um and then the
[46:02]
intersection at Sentry and Bailey
[46:06]
um did the study since the traffic
[46:09]
signals warranted was there discussion
[46:12]
about a roundabout instead of a traffic
[46:15]
signal? Yeah, there was uh and will
[46:18]
continue to have review of the ultimate
[46:21]
intersection control and that's
[46:22]
ultimately a Washington County decision,
[46:24]
but the initial evaluation identified
[46:26]
that the best operational because of
[46:28]
some of the land uses in the area as
[46:30]
well as the adjacent uh signalized
[46:34]
intersection uh improvements at military
[46:36]
etc. that it is likely highly likely to
[46:39]
be a signalized intersection versus a
[46:41]
roundabout.
[46:42]
>> Okay. Um, I bring it up too for a
[46:46]
thought as well since I believe we're
[46:47]
making the city's making improvements to
[46:49]
La Lake Park in the future. And so I'd
[46:52]
imagine anybody living here might also
[46:54]
want to cross Bailey and I I feel like a
[46:57]
roundabout would be a more safer
[47:00]
intersection control option. But that's
[47:03]
just my two cents on that one. Um
[47:08]
and
[47:12]
uh no further questions. Chair,
[47:15]
>> thank you. Commissioner Jen Teal. Sorry.
[47:18]
>> Thank you, Chair.
[47:19]
>> Almost had to talk twice.
[47:21]
>> Eric Stang on page five of the staff
[47:23]
report uh going into the access points.
[47:26]
Uh point B uh interested in the
[47:29]
opportunity as we compete with the city
[47:31]
of Newport adding in a area for the
[47:34]
welcome to Woodberry signage and
[47:37]
incorporating that as a main artery to
[47:39]
MSP going to and from would like to
[47:42]
maybe beat the city of Newport to a sign
[47:44]
being allocated in that area um as we
[47:47]
work on the the plan for Century.
[47:51]
I think that whether that's a part of
[47:52]
the monumentation
[47:55]
as part of the retail area or something
[47:57]
in that area, I think that does make
[47:58]
sense.
[47:58]
>> Perfect. Uh going to then page seven of
[48:01]
the staff reports, item 20, traffic
[48:04]
signal. Just wanted to kind of confirm
[48:06]
the city's definition of city cameras
[48:10]
and if we need to allocate or include
[48:12]
cameras to that location, you know, as
[48:14]
we look at the phasing and or is it by
[48:17]
the approved city engineer covers covers
[48:20]
that? Yeah, I would say that the last
[48:22]
sentence covers it within condition 20.
[48:23]
>> Perfect. And then uh sticking with that
[48:26]
and then the traffic study for uh access
[48:29]
point B. Um being that we take the brunt
[48:32]
of the master plan, are we able to
[48:35]
negotiate with Washington County a any
[48:38]
timing goals between Bailey and Military
[48:40]
and Bailey and Century to help with peak
[48:43]
periods with the school? Yeah, I think I
[48:46]
mean I think Washington County this will
[48:47]
be privately constructed so there'll be
[48:48]
some ability to to work with some
[48:52]
improvements at least at the signalized
[48:54]
side. Future upgrades to Washington
[48:56]
County are you know the the one of the
[48:58]
first questions from the commission
[49:00]
tonight was what's the timing and the
[49:01]
timing is not known yet. So that's one
[49:03]
of the challenges that Washington County
[49:04]
has is they want to be responsive to the
[49:08]
future demand but not build earlier than
[49:10]
necessary. So those conversations will
[49:14]
continue as we get more information that
[49:17]
development applications are moving
[49:19]
forward. We'll be in direct
[49:20]
communication with Washington County so
[49:22]
that they can begin their um ultimate
[49:24]
planning work on those gaps.
[49:25]
>> Perfect. Thank you, Chair. Thank you.
[49:27]
Chair, no further questions.
[49:31]
>> All right. Well, I've only have one
[49:33]
question comment that hasn't been
[49:35]
addressed by other commissioners. Can we
[49:37]
talk about the dotted line and why it is
[49:40]
still in the plan? Could it be possible
[49:42]
to maybe just have a few little dots
[49:44]
within a little asterisk saying the
[49:47]
terminus of this extension to be
[49:50]
determined?
[49:51]
>> Yeah, I I mean I think right now the
[49:53]
terminus is uh back on page five, it is
[49:57]
identified under that access point D. So
[49:59]
we we were trying to be pretty
[50:00]
transparent about where it where it does
[50:02]
end. And then also when you pair that
[50:05]
with the language within access point E
[50:08]
about that 2050 that's consistent with
[50:10]
the master plan and the master plan will
[50:12]
have those dotted area areas. We could
[50:16]
certainly graphically show that further.
[50:18]
Again the master plan will show a very
[50:21]
um deliberate dashed line that just says
[50:24]
for study as part of the 20150. What I
[50:26]
actually meant was not point D but um
[50:29]
the extension part of E where what I was
[50:33]
imagining
[50:35]
if you will. Okay, there's a D
[50:39]
and then you just go dot dot dot dot
[50:41]
with an asterric there. So it doesn't
[50:43]
actually connect up to century
[50:45]
graphically, but it could if that's what
[50:48]
ends up happening in 2050 for the 2050
[50:51]
comp plan.
[50:53]
I mean from a technical plat standpoint
[50:56]
it actually ends here. So it's not
[50:58]
connecting actually to
[50:59]
>> I'm sorry I can't see what you're
[51:00]
saying.
[51:01]
>> Uh sorry habit. Um let's go to a
[51:06]
>> so on back to page five.
[51:11]
>> It ends at the property line. There's a
[51:12]
gap between those areas that sentry that
[51:16]
would have to occur. So this is really
[51:18]
just showing where it ends at the
[51:20]
planet. It's not showing all the way.
[51:21]
that would be done under there have to
[51:23]
be property acquisition there have to be
[51:25]
other things that occur. So that's not a
[51:26]
d as part of what's shown in exhibit
[51:31]
on page five on the access point
[51:33]
exhibit. It does not connect with
[51:36]
existing Century Avenue.
[51:41]
» Have has the city explored yet
[51:43]
connecting point D to point F going to
[51:47]
the east and the north?
[51:50]
We we have not evaluated uh any
[51:53]
alternatives that would be the work task
[51:55]
as part of the 2050 plan.
[51:58]
>> That's kind of my point though because
[52:02]
this is so unofficial. I'm sorry but we
[52:04]
have the road going from Bailey up to
[52:08]
the point D. And I understand their the
[52:13]
commenters's points about it looks like
[52:16]
it's going to connect a century. And if
[52:18]
we are thinking about considering other
[52:20]
alternatives, what if we don't have this
[52:23]
little swoop here where the E is and we
[52:26]
just have a an extension at D and then
[52:30]
we don't necessarily know if it's going
[52:32]
to go to the east and up, if it's going
[52:35]
to go this way.
[52:37]
I understand their point that it it
[52:39]
looks a little more official than the
[52:42]
text actually says it is.
[52:45]
Yeah, I've
[52:48]
I think if the planning commission would
[52:49]
like additional graphics added to the
[52:52]
record, we can certainly do that for
[52:54]
council to to show that in a little bit
[52:58]
more of a a clear fashion that the
[53:00]
segment from
[53:02]
north from where the on page five where
[53:06]
the letter D is to the property line is
[53:09]
that full area for future review. We can
[53:12]
certainly add that to the public record.
[53:14]
Mass ask a follow-up question related to
[53:16]
yours.
[53:17]
>> So I guess my question would be is
[53:20]
do we need to dedicate the rightway all
[53:23]
the way through the plat as proposed if
[53:26]
it if there are alternative analysis
[53:30]
being considered.
[53:32]
>> Uh we we necessarily have to this is the
[53:35]
preliminary plat. The final plat would
[53:37]
dictate what what is or is not dedicated
[53:40]
at this point. We do not need the road
[53:43]
right ofway dedicated at this time.
[53:47]
>> Can I conduct a straw poll? Just hit
[53:50]
raise your hand if you like this graphic
[53:52]
idea. Commissioners
[53:55]
on three. One, two, three. I like it.
[53:58]
>> No. Okay.
[54:00]
>> Can I ask questions?
[54:01]
>> Yes. with you for community motion
[54:04]
discussion or sorry to
[54:05]
>> I you know so so Eric as I understand
[54:08]
that F point that you are showing there
[54:10]
right that's already in a neighborhood
[54:13]
there correct
[54:14]
>> that is correct
[54:15]
>> so and and what we are talking about
[54:17]
here in essence what problem are we
[54:18]
trying to solve the problem we are
[54:20]
trying to solve is whatever comes in
[54:21]
what is outlaw D needs to have access
[54:25]
right can that access actually come from
[54:28]
a combination of D and a combination of
[54:30]
F as compared to anything running up to
[54:33]
Century Avenue um you know because we
[54:37]
don't know what outlot B is going to be
[54:38]
but let's just say it's low density
[54:40]
housing which is the concept that you
[54:42]
had kind of put in front of us that can
[54:46]
suffice with two different you know kind
[54:48]
of access point D and F and doesn't need
[54:51]
to actually go and connect what you're
[54:54]
showing here with E and the Century
[54:56]
Avenue going north. Yeah, I think that's
[54:59]
exactly what'll be looked at as part of
[55:00]
the 2050 transportation plan is what are
[55:03]
the volumes, what are the anticipated
[55:04]
volumes of traffic for both the area to
[55:07]
the south and the north. That's already
[55:08]
in the traffic study, but we'll look at
[55:10]
that further. Um, the adopted 2040 plan
[55:14]
does show the extension of Century
[55:16]
Avenue. So, the 2050 plan would have to
[55:18]
amend that under any scenario or as part
[55:21]
of a separate action, you would need to
[55:23]
delete that from that.
[55:24]
>> Okay. The way to delete that or amend
[55:26]
that is through detailed study and
[55:28]
that's exactly what's being proposed as
[55:29]
part of the 2050 plan.
[55:31]
>> All right. Thank you,
[55:32]
>> Commissioner.
[55:33]
>> Sorry I interrupted.
[55:35]
>> I just and just a note um if if D does
[55:39]
connect over onto the roadway with F. Uh
[55:41]
if you take a look on at the legend,
[55:44]
there's concern that it would drive
[55:45]
right through the neighborhood. They
[55:47]
want it to be local connectivity versus
[55:50]
moving background traffic through the
[55:52]
site. So, you've got to balance the two.
[55:54]
What's the lesser of two evils perhaps?
[55:56]
I know that probably means another
[56:00]
traffic study or just engaged. I I don't
[56:03]
know what that means.
[56:04]
>> Yeah, I would advise the commission that
[56:06]
access point F has been has a future
[56:10]
street extension signed there, but from
[56:13]
a a routing standpoint is likely not a
[56:17]
efficient way to move trips to an
[56:19]
ultimate destination. It makes sense as
[56:21]
a neighborhood connectivity standpoint.
[56:22]
That is certainly the best practice.
[56:24]
Access point E and the connection to
[56:27]
existing Central Avenue is in our 2040
[56:29]
plan, but as the council directed and
[56:32]
the master plan now has been updated to
[56:34]
direct is that'll be looked at as the as
[56:36]
part of a needs analysis as part of the
[56:39]
our next planning exercise.
[56:42]
>> Thank you, chair.
[56:44]
>> Did anybody have any other thoughts
[56:46]
about this very beautiful sketch as
[56:50]
presented?
[56:52]
I think
[56:52]
>> okay
[56:53]
>> chair if you would I mean from a staff
[56:55]
standpoint I think with for the
[56:57]
residents that are in the audience or
[56:58]
the and for anyone we want this to be
[57:01]
clear and and our goal within some of
[57:03]
the design and purpose was to to add
[57:04]
that level of clarity because as people
[57:06]
look at this one two six years from now
[57:08]
we wanted to make sure and we'll have
[57:10]
minutes from this meeting as well we can
[57:12]
add some graphics to better show what
[57:14]
the intent of the dialogue has been
[57:16]
which is this what I'll call segment E
[57:19]
is a future study
[57:21]
Maybe that's a simple future study goes
[57:23]
below it.
[57:24]
>> I I think the text makes that clear.
[57:26]
It's the graphic that I think is
[57:28]
throwing residents off because frankly
[57:32]
people like pictures and they're going
[57:33]
to look at pictures first.
[57:34]
>> I I I think you know it's a balance
[57:37]
because we also it there could be under
[57:39]
that analysis that it is recommended
[57:41]
that it occurs and if we delete it
[57:43]
you're going to have a lot of residents
[57:44]
saying well we didn't know we didn't
[57:46]
know that that was even a possibility.
[57:47]
So it's a balance. We're trying to
[57:49]
balance and it is going to be a thorough
[57:51]
review. It is not a review that is uh
[57:54]
that that that's going to be done to
[57:57]
with rigor to see what ultimately is
[57:59]
best for the community.
[58:04]
» You know, from my standpoint, it
[58:06]
actually depends on what is the density
[58:07]
of like people needing to go into outlaw
[58:10]
D area, whatever that turns out to be,
[58:12]
right? Um that's kind of what is going
[58:15]
to drive the access piece.
[58:18]
my opinion
[58:19]
>> and those land use decisions will be
[58:21]
done as part of the land use chapter of
[58:23]
the 2050 plan and so that's the stacking
[58:25]
of decisions. So you start with the land
[58:27]
use to get those inputs ultimately then
[58:29]
look at it through the transportation
[58:30]
lens.
[58:31]
>> What about if under the design and
[58:33]
purpose legend for um E where it talks
[58:38]
about the 2050 comprehensive plans just
[58:40]
in parentheses including alternative
[58:43]
routes. Sure.
[58:46]
>> That if the commission is supportive of
[58:48]
that, staff would not have any issue
[58:49]
with that. And
[58:50]
>> is that going to go over better than my
[58:52]
little sketch?
[58:56]
» Second.
[58:56]
>> Okay.
[58:58]
All right. Do we have any other public
[59:01]
comments come in? Any other um questions
[59:04]
online?
[59:06]
>> Not at this time, chair.
[59:07]
>> Okay. Does anybody have any other
[59:09]
questions, comments, concerns?
[59:13]
All right. I can't do it. Look alive,
[59:15]
people. We're looking for a motion.
[59:20]
I move to approve the project number 1
[59:24]
19202500600
[59:28]
the um Bailey West comprehensive plan
[59:32]
amendment resoning and preliminary plot
[59:36]
with the um additional I think two um
[59:40]
conditions signage as um suggested by
[59:43]
Commissioner Gentiel and um to perhaps leave room for further
[59:51]
exploration of the Century Road
[59:53]
connection, including alternative access
[59:56]
paths.
[59:58]
>> Do we have a second?
[59:59]
>> I second.
[1:00:01]
>> All right, the motion passes. Oh, no, it
[1:00:03]
doesn't. Wait, we need to vote.
[1:00:07]
All in favor, say I.
[1:00:09]
>> I.
[1:00:10]
>> All right, now it passes. It will be
[1:00:13]
going to the
[1:00:16]
July 8th city council hearing.
[1:00:21]
And with that, we are ready to move on.
[1:00:24]
Have has anybody had uh Oh, council
[1:00:27]
member Stafford is here for our council
[1:00:30]
report.
[1:00:34]
This is kind of interesting the way
[1:00:37]
these graphics are going here. Um, this
[1:00:39]
is my last planning commission meeting.
[1:00:43]
Uh, council member Santini will be with
[1:00:46]
you the next quarter. We alternate them
[1:00:48]
quarterly.
[1:00:50]
Um,
[1:00:52]
what have we been up to? We have been
[1:00:53]
looking at
[1:00:55]
drafts of solicitor permits, the
[1:00:59]
doortodoor sales people,
[1:01:02]
as we've had a lot of concern and have
[1:01:04]
thought about it. So, we've got staff
[1:01:06]
working on drafts for that. We're making
[1:01:09]
progress with a draft of backyard
[1:01:11]
chickens.
[1:01:15]
Um, so the part of it, a big part of it
[1:01:18]
is listening to the community as you
[1:01:20]
have done tonight with the people in
[1:01:22]
Century Avenue. Is it this is where
[1:01:25]
government works slowly, but it's
[1:01:27]
because we're listening to get it done.
[1:01:30]
And then last but not least is the uh
[1:01:33]
Fourth of July hometown celebration and
[1:01:36]
it's at M Health Fairview this year on
[1:01:38]
the 4th of July and there's lots of
[1:01:41]
activities. It's going to be one of the
[1:01:43]
biggest ones we've ever had and we're
[1:01:45]
all very excited.
[1:01:48]
So I hope to see you all out there and I
[1:01:50]
hope it's a little cooler than it is
[1:01:52]
today.
[1:02:01]
Thank you, Council Member Stafford.
[1:02:04]
Next, we have approval of the minutes
[1:02:06]
from June 16th. Does anybody have any
[1:02:10]
questions, comments, concerns about the
[1:02:12]
minutes?
[1:02:22]
So, I have one
[1:02:26]
on page six, very first line, if we
[1:02:30]
could just add the word asked.
[1:02:34]
Uh, Miss Swanson said that she had a
[1:02:36]
parking concern in the high density
[1:02:38]
residential area. And if
[1:02:41]
and asked if that would be a
[1:02:43]
subterranean garage for the residents.
[1:02:48]
Just the one this time.
[1:02:52]
All right. We will entertain a motion
[1:02:54]
for the minutes.
[1:02:59]
» I'll make a motion to approve the
[1:03:01]
minutes.
[1:03:03]
>> Do we have a second?
[1:03:04]
>> I'll second.
[1:03:07]
>> All in favor say I.
[1:03:08]
>> I. I.
[1:03:10]
>> The minutes are approved and we are
[1:03:13]
adjourned. Thank you.