Raleigh Design Review Commission
1:34:57 And so we're doing the work on that level. Every time we engage with somebody at the community center, we say also know where you can school making relationships and those connections.Play from 1:34:57
Video, transcripts, and deep links for 7 archived Raleigh, NC public meetings from 2025-08-12 to 2026-09-03 — 7 with a searchable transcript.
Quotes mentioning libraries & parks. Show all topics.
1:34:57 And so we're doing the work on that level. Every time we engage with somebody at the community center, we say also know where you can school making relationships and those connections.Play from 1:34:57
6:09:15 We do not want all new schools in downtown or mixed use areas to have different access to open space or natural environments. We need to recognize that school lot size benefits safety and allows classroom activities to occasionally move outside the building.Play from 6:09:15
21:39 …amendment did schematic design through construction. So we're on park. And then some of the key features, the community center playgrounds play court, parking, and so forth.Play from 21:39
2:10:12 I appreciate the 15,000 square feet. A lot of times, technically, these projects downtown are required to provide open space, but due to the technicality of it, it's really not usable.Play from 2:10:12
59:00 So there is a 50-foot width requirement. However, this is measured such that each open space area has at least, if it has at least one 50 by 50 area within it, regardless of where in that open space, then it counts towards the minimum open space requirement.Play from 59:00
Search within Raleigh, NC meetings → · All North Carolina governments · All coverage