Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:00]
whatever is approved for steps and
[0:02]
management. So that stay the same. uh
[0:05]
longevity is as it was or as it should
[0:08]
be for staff members
[0:13]
um postage you know I mean we basically
[0:16]
have the same kind of postage we we
[0:18]
reduced the I mean we didn't reduce I'm
[0:22]
realizing the cost of computers and
[0:25]
computing equipment is going up so we
[0:30]
have gone down from before so we may
[0:32]
have to borrow a computer to pay in the
[0:35]
future if we need to deal with computer
[0:37]
equipment. Um I just this year was able
[0:42]
to replace a computer that I had since I
[0:44]
had been at the city. So I know that
[0:48]
we're going to have to go through some
[0:49]
cycles of but I think everyone else in
[0:51]
the office has had new machines. Um so
[0:54]
hopefully we can not have to worry about
[0:57]
um new computing equipment. um postage.
[1:00]
We we still have a lot, you know, we
[1:01]
send out um information to those folks
[1:04]
who have their exemptions and wait to
[1:07]
renew their exemptions. So um we send
[1:09]
out that you know there's other
[1:12]
requirements in terms of us sending out
[1:14]
information to people about renewing
[1:17]
exemptions um not just from the STAR
[1:20]
program but also other exemptions that
[1:22]
they have. So that is a costly thing but
[1:25]
we didn't change it from last year
[1:26]
because it generally stays the same. um
[1:30]
administration expense. So that I can't
[1:35]
remember what we that that's generally
[1:37]
paying for um our access to Gar MLS, the
[1:42]
multiple listing service so that we can
[1:44]
do um our appraisals and things that we
[1:48]
use for
[1:50]
value property. Um and also Siren, which
[1:53]
is a the commercial part of that.
[1:57]
And then advertising. We haven't really
[2:01]
haven't we the only thing we really need
[2:03]
to do with advertising is put legal
[2:05]
notices in the paper as per real
[2:07]
property tax law. We need to let them
[2:09]
know when we put the tenative roll out
[2:11]
and when we put the final roll out. Um
[2:13]
doesn't really cost too much. So that's
[2:15]
a limited extent. um inservice training
[2:20]
that uh so the appraiser in the office
[2:24]
is required to have an appraisal license
[2:27]
and we pay for continuing education for
[2:29]
her. I have an appraisal license and I
[2:31]
have to stay certified at the state for
[2:34]
continuing it. So that there hasn't, you
[2:37]
know, it really hasn't changed. There
[2:39]
wasn't anything that changed with that.
[2:41]
Um, we have to pay New York State for
[2:44]
the privilege of using real property
[2:47]
service, which is our RPS system,
[2:50]
and they're in the process of changing
[2:52]
that over, but they have told us that
[2:54]
there is going to be no change in the
[2:56]
amount of money that we have to pay, and
[2:58]
it's based off parcel size or size of
[3:01]
the municipality in terms of parcels.
[3:04]
So, um that shouldn't change. Uh we
[3:07]
reduced a little bit of our supplies
[3:08]
budget because we found that we're not
[3:10]
um sometimes
[3:12]
well now that we're ordering our paper
[3:14]
from the stable. We used to order paper
[3:16]
through multiple departments, but um
[3:18]
we're ordering paper through stables and
[3:20]
it's a little cheaper now. Um and then
[3:23]
the maintenance contracts, that's our we
[3:25]
got a new copy machine. We do a lot of
[3:27]
copies. Um, when they when folks come in
[3:29]
with their exemption applications, we
[3:32]
give them a copy of their front page
[3:34]
after we stamp it so that they have
[3:36]
their receipt is what we call it.
[3:39]
>> Um, and that's, you know, it's kind of
[3:41]
it's been expensive with the new
[3:43]
contract. The last one we had, we didn't
[3:46]
pay we just paid for maintenance and
[3:48]
then it just got to the point where it
[3:49]
was too old. So, we needed to um
[3:51]
purchase a new product machine. Um and
[3:54]
the the board of assessment review that
[3:57]
the salaries are going to remain the
[3:58]
same. So there's really hasn't been too
[4:01]
much. I think the the most increase has
[4:04]
been with salaries based on you know
[4:07]
steps for um union employees and then
[4:11]
you know whatever management.
[4:18]
Any questions?
[4:20]
>> Questions.
[4:22]
Go ahead, please.
[4:24]
>> So, the the real property appraiser. So,
[4:26]
is that who does like appraisers for us?
[4:29]
Appraisals for us like because I know we
[4:31]
talked about that person on commercial
[4:34]
or excuse me, focus on residential
[4:36]
appraising and then I deal with the
[4:38]
commercial stuff.
[4:43]
» Any other questions?
[4:45]
>> Is that answer?
[4:47]
>> Yeah, my question was along the line. I
[4:49]
know like we had conversations around
[4:51]
expenses that it would that could
[4:53]
potentially cost the city if we had to
[4:54]
get it appraisal done and
[4:57]
>> yeah so it's a little when we have to go
[4:59]
like for a tax purposes
[5:01]
>> sure
[5:02]
>> we need a trial ready appraisal which
[5:04]
was not something that we should provide
[5:06]
in house it's something that we need to
[5:08]
hire out for
[5:09]
>> for like the separation okay
[5:11]
>> yeah because in real property tax law
[5:14]
what's on the books for the assessment
[5:15]
office is supposed to be what's legally
[5:17]
acceptable and Then if you need to prove
[5:21]
otherwise, you know, a petitioner has to
[5:22]
come in and say provide,
[5:25]
we have to provide a uh
[5:28]
>> that makes sense to me.
[5:29]
>> Something outside of that.
[5:30]
>> Thank you.
[5:33]
>> Any other question?
[5:36]
Thank you so much for your time.
[5:37]
>> Thank you.
[5:41]
» The board of assessment um there's no change there.
[5:46]
>> No, no, no change.
[5:49]
still, you know, are receiving the same
[5:51]
um payment they've received for
[5:55]
as long as I've been here.
[5:58]
>> We have known over the years that the
[6:00]
attendance, how did you see attendance
[6:02]
um from his board last year?
[6:04]
>> It was it was very good.
[6:05]
>> Very good.
[6:05]
>> Yeah. You know, I I think if there's
[6:08]
anything to question, um it's that we
[6:12]
don't have the volume and I don't know
[6:14]
the history because I wasn't here for
[6:16]
the last readaloud, but we don't know
[6:17]
the volume of
[6:20]
um
[6:21]
things that they had to deal with
[6:23]
before. I just know the value volume now
[6:25]
has gone down. Right. So, but if we
[6:27]
enter into some kind of revaluation in
[6:30]
the future,
[6:31]
they're going to earn their earn their
[6:35]
wages, earn their their money. So,
[6:37]
that's I mean, I think that's something
[6:38]
to think about in terms of keeping it,
[6:41]
particularly if we're looking in the
[6:42]
near future.
[6:45]
>> I I have a question about that, but I
[6:47]
think it might be more for u the
[6:48]
commissioner. Do we pay them at the end
[6:50]
of the year or something? Like, why have
[6:52]
we not have we not
[6:54]
>> What's that? Sorry. um the board
[6:56]
>> board of assessment to review um they've
[6:58]
all
[6:58]
>> usually once a year
[7:00]
>> once a year as soon as they're finished
[7:02]
with their contractual
[7:04]
you know their um what they have to do.
[7:07]
So, as soon as they're finished with
[7:10]
soon as our board chair signs off on all
[7:12]
the letters, that's when I release the
[7:14]
payment and I give um the vouchers to
[7:17]
the sign's office
[7:18]
>> and that typically me. She's your
[7:21]
>> No, that's Yeah, at the end it's it's
[7:23]
typically before July 1st because
[7:26]
everything has to be out July 4 1st. So,
[7:29]
everything has to be signed off by that.
[7:31]
>> Okay, great. Yeah. Thank you.
[7:33]
>> Any other question?
[7:35]
>> I see no time. Afternoon.
[7:38]
>> Excellent.
[7:39]
>> We will go into the clerk's office and
[7:42]
that is on the bottom of page 80.
[7:48]
» Page 1814 clerk's office has increased
[7:51]
by 5.55% from 325,000
[7:57]
uh 37 approximately 17,000
[8:08]
about this group that's not here.
[8:21]
» Okay. The only salary increase that's a
[8:24]
little different is the deputy res who
[8:27]
is deputy from bio records. uh her
[8:32]
salary with uh the regular management
[8:36]
increase would be below the IPS3 who she
[8:40]
manages. So her increase was a little
[8:43]
higher than you know than everyone else.
[8:46]
It doesn't fall in line. Um
[8:50]
we have a slight reduction in supplies
[8:53]
and postage.
[9:02]
I think uh we can finally get to link
[9:04]
with that. It should be okay. Uh
[9:08]
travel conferences we haven't had in a
[9:10]
while. And in the service training
[9:13]
that's still the same. Although
[9:16]
um last uh last month there was a
[9:19]
conference training that I wanted to go
[9:20]
to but we just didn't have enough in the
[9:22]
budget for it.
[9:27]
» So So is this fun? I'm sorry. Go ahead,
[9:31]
please.
[9:32]
>> That would not cover the cost to go to
[9:34]
that.
[9:34]
>> No.
[9:35]
>> Yeah, you're right. Especially if it's
[9:37]
if there be Okay.
[9:43]
» Any question from Miss Michael? Please
[9:45]
go ahead.
[9:45]
>> Hi, thank you. So, so the clerical aid
[9:48]
is a 12% increase. Can you explain why
[9:50]
that was again? the IPS
[9:53]
or the cler
[9:55]
that's union. So the IPS3 and the
[9:59]
clerically they're both union positions.
[10:01]
So that goes in line with the contract.
[10:06]
» And does that include a step increase?
[10:12]
Yes.
[10:12]
>> Okay.
[10:14]
>> Any other question?
[10:20]
Seeing none, we're good. Thank you.
[10:24]
>> We'll go into um
[10:29]
code enforcement and that is on the
[10:31]
bottom of page 59
[10:34]
into 60
[10:39]
the enforcement decreased by 11.89%
[10:42]
from 1.4 million approximately to 1.2 2
[10:46]
million uh 170.
[10:53]
» Do you need this?
[10:55]
Hold on.
[11:04]
Finish with me.
[11:05]
>> Yes. Can you please walk us through any
[11:07]
significant changes within your
[11:10]
department budget?
[11:13]
So, um I'll start with staffing. So, um
[11:16]
we made some significant changes for
[11:19]
staffing. We've uh
[11:23]
lowered the code enforcement. First of
[11:26]
all, uh no proposed changes or requests
[11:29]
for salt. Um this estimated 3% increase
[11:35]
for for a management and uh across the
[11:39]
board.
[11:42]
So um we have eliminated two positions
[11:46]
for code enforcement officers and
[11:49]
uh also for administrative staff we have
[11:53]
eliminated the clerk position.
[11:59]
So um
[12:02]
the electrical inspector has went from
[12:06]
full-time to a part-time position. I
[12:08]
don't know if that's reflecting on
[12:10]
I'm not looking at what you're looking
[12:12]
at.
[12:14]
>> It's not built.
[12:15]
>> It's not.
[12:17]
>> So, we're proposing to go to a part-time
[12:21]
position for the electrical inspector at
[12:24]
a $35,000 salary that it's been updated
[12:28]
or should be updated.
[12:30]
>> No, it's not updated as a proposal. We
[12:32]
had a conversation about it.
[12:34]
>> This was after the budget was put
[12:36]
together. Yes. So, um I'm proposing to
[12:40]
put that 35,000
[12:42]
back in for the electrical inspector,
[12:44]
parttime position. That'll be split. So,
[12:47]
we'll have a a part-time position for
[12:50]
the electrical inspector and leading on
[12:52]
third party services to uh make up the
[12:55]
difference there, make sure we can cover
[12:57]
our services.
[12:59]
>> What is the amount that you're trying
[13:00]
that you'd like to turn in the budget?
[13:02]
>> 35,000.
[13:03]
>> 35.
[13:04]
>> Yes.
[13:08]
And where would that Oh, so that would
[13:11]
be would that go under um the
[13:13]
>> spect
[13:17]
should be 4,000,
[13:20]
>> so so just leave it in at 75,15
[13:24]
this year.
[13:26]
>> Right. But
[13:26]
>> zero No,
[13:28]
>> the problem
[13:30]
>> position is
[13:33]
>> hiring an individual who is a retired
[13:36]
city firefighter
[13:38]
as a certification into teacher Hudson
[13:41]
Valley,
[13:44]
great guy.
[13:47]
But because he is retired in under the
[13:50]
age of 65, he is limited to earning only
[13:55]
$35,000
[13:57]
a year. Uh I thought this might resolve
[14:00]
it. So county civil service commission
[14:03]
gave a test to the electrical inspector.
[14:06]
He is the only person that took it, the
[14:08]
only person that passed.
[14:10]
>> So I can only hire him for 35,000.
[14:14]
There's some indication this
[14:18]
past budget year going in that the state
[14:21]
was going to raise that amount that
[14:24]
individuals could make as retirees.
[14:28]
Uh but it's still at 35,000. So we're
[14:32]
somewhat of a quandry or I'd like him to
[14:34]
be here full-time, but we can't pay him
[14:38]
full-time salary and it worked it. So if
[14:40]
he worked for a while at the 35,000
[14:44]
then now is working a outside contractor
[14:50]
group in to do the electrical
[14:52]
inspecting. So it's a less than optimal
[14:56]
scenario. It's
[14:59]
reality recruitment and people that meet
[15:01]
the technical background.
[15:05]
So may how is that third party
[15:07]
inspection?
[15:10]
Good. He's going to inspect.
[15:13]
>> So individual pay
[15:16]
for party inspection and then how our
[15:18]
inspector will do it.
[15:20]
>> Uh correct.
[15:24]
» Go ahead please.
[15:25]
>> No, I just I was asking for
[15:27]
clarification. So what did we spend last
[15:29]
year on on this particular salary line?
[15:31]
It was 75,000 last year.
[15:33]
>> It was uh very close to 75,000. I don't
[15:35]
have the exact figure in front of me,
[15:37]
but yes, you're you're very close to
[15:40]
getting.
[15:42]
>> So, last year he was able to earn the
[15:44]
full salary while you're working through
[15:46]
this process.
[15:47]
>> Um, he he came on board city midway
[15:51]
through the year.
[15:52]
>> So, he didn't reach that threshold
[15:56]
uh that conflicted with his retirement.
[15:59]
So, uh, when that when that threshold
[16:02]
was getting close to where we made some
[16:05]
changes,
[16:07]
>> so we didn't spend 5,000 next year
[16:09]
because he only
[16:12]
position retired, but he was paid for
[16:16]
the remainder of the year to roughly
[16:19]
35,000. So, the expenditure on that line
[16:23]
was close to budget.
[16:29]
Go ahead.
[16:31]
You said earlier that there was no
[16:33]
increases beyond the 3%. Correct. The
[16:39]
enforcement supervisor
[16:42]
is plus $3,000. Didn't know if you had
[16:44]
explanation for that. That clearly
[16:45]
exceeds the
[16:48]
different.
[16:53]
» And then follow question M. Um, seeking
[16:57]
clarification of one of the questions
[16:59]
I've had about any code enforcement
[17:02]
officers. My understanding those are
[17:04]
revenue generating positions and as
[17:06]
compliance enforcement officers in the
[17:08]
past you've talked about some of the
[17:10]
difficulties with um training
[17:13]
individuals in this profession and how
[17:14]
it requires a steep learning curve. Um,
[17:17]
but I wanted to know were these
[17:19]
reductions related to the revenue
[17:21]
reductions with respect to like a
[17:23]
building?
[17:25]
Well, historically, I'm aware that uh
[17:29]
while we had 12 positions budgeted,
[17:33]
uh we we have never had them filled.
[17:37]
Um and I I believe with
[17:41]
provide professional services from a
[17:44]
city to the public with with no problem
[17:47]
with the 12 positions.
[17:50]
>> So, just follow up to that. Sorry. Um
[17:52]
yes,
[17:53]
>> those additional two positions were they
[17:55]
never sought to be filled or what was
[17:57]
the expectancy and not pursuing them?
[18:00]
>> Um they haven't been filled since I've
[18:02]
been with the city and uh I'm aware that
[18:05]
they weren't filled uh even close to
[18:08]
when I came on board. So, I came on
[18:11]
board with 10 officers and u I can't
[18:15]
speak for the exact situation leading up
[18:18]
to me coming on board with the city, but
[18:22]
I I don't believe they've ever been
[18:24]
filled.
[18:29]
» So, you budgeted for 10. How many are currently filled right now?
[18:35]
>> Five right now.
[18:36]
>> But right now, we only have five. with
[18:39]
five.
[18:43]
And how long has it been at?
[18:45]
>> Um, actually today we're staying with
[18:47]
five.
[18:49]
>> Okay. Was it before that?
[18:51]
>> Um,
[18:53]
before today.
[18:55]
>> So did five bring you up to five taking
[18:58]
down?
[18:58]
>> Five brought brought us up. So we had
[19:00]
two officers become certified today.
[19:04]
>> So before then you had three.
[19:05]
>> Yeah, we have today.
[19:06]
>> Yep.
[19:08]
three certified officers, uh, three
[19:11]
certified management, so six working
[19:15]
certified officers and, uh,
[19:22]
» just just for a little more clarity, so
[19:24]
you had five, but did did the three
[19:25]
management actually go out into the
[19:27]
field or was that more
[19:28]
>> We have since we've been um since we've
[19:32]
been struggling with uh staffing and
[19:35]
we've been having a little bit of
[19:37]
shorting staff it short shortage there.
[19:40]
We have been working field one
[19:43]
>> and now with the two officers uh
[19:46]
becoming certified today we virtually uh
[19:48]
doubled our field staff.
[19:53]
Um, I was looking at the uh revenue
[19:56]
today from the year-to- date budget
[19:58]
reports and we're we're down um in uh
[20:02]
the uh the fees, the president fees. And
[20:06]
I was just wondering if if you had any
[20:09]
idea on why we're not bringing in that
[20:12]
revenue. I'm not sure if you can answer
[20:14]
that or if there's just less going on or
[20:17]
>> Can you share the line? Yeah.
[20:19]
I don't know if you have this, but I'll
[20:21]
show you the on.
[20:23]
>> I'll just um It's call for everybody
[20:25]
else.
[20:25]
>> Call the number of the number.
[20:27]
>> Yep. For everybody else, it's um and I
[20:29]
think Mr. Williams was starting to
[20:30]
allude to this maybe, but it was 251.
[20:34]
Um it's really been through
[20:37]
B, I think. But the more significant uh
[20:41]
decreases are in the um the plumbing
[20:45]
permit fee. I mean in terms of what we
[20:47]
were expecting for revenue. Okay.
[20:49]
>> Um the uh let's see that was plumbing
[20:54]
permit, electrical permit
[20:58]
um and rental certific.
[21:08]
So the plumbing permit fee while we do
[21:13]
work hand in hand with plumbing uh does
[21:16]
reside in the water department. It's in
[21:19]
that budget. Um so I won't speak on
[21:21]
that. I think that's more uh
[21:25]
appropriate for OS and the water
[21:28]
department to speak on the funding.
[21:30]
>> Okay. Um the other permit fees um
[21:41]
I think the biggest moment will be
[21:47]
electrical went down by 70,000.
[21:54]
Um
[21:58]
I think it might be related to
[22:02]
it could be related to trends. So there
[22:05]
might not be as much work going on in
[22:07]
the field
[22:09]
last year.
[22:14]
[Music]
[22:18]
So we did have some large projects that
[22:22]
were permitted last year and they were
[22:24]
significant. They were
[22:29]
hundred hundreds of thousands of dollars
[22:30]
in permit fees. So that could affected
[22:33]
us significantly.
[22:35]
>> Thank you.
[22:37]
>> Go ahead.
[22:38]
>> Um
[22:39]
thank you. Um Mr. Chy, do you have any
[22:42]
um anyone in queue ringing up, you know,
[22:46]
to be placed to up your five?
[22:49]
>> Um, so it is a priority to fill those
[22:52]
spots and I'm looking for good qualified
[22:56]
candidates and um we're having a little
[22:59]
bit of a challenge in finding qualified
[23:02]
candidates. realizing there's a hiring
[23:04]
freeze. Um I just wondered if you have
[23:07]
someone that was already in training at
[23:08]
this point. So you're constantly
[23:10]
looking.
[23:11]
>> No. So we are constantly uh interviewing
[23:13]
and I don't have anybody in training
[23:15]
now.
[23:16]
>> Okay.
[23:16]
>> Um
[23:18]
reviewing applications and it's a high
[23:20]
priority to bring fill those positions.
[23:23]
>> Thank you.
[23:23]
>> You're welcome.
[23:25]
>> Go ahead.
[23:26]
>> Thank you. So um you talked about the
[23:28]
plumbing permit piece, but um there's
[23:30]
really no change in that. There's
[23:32]
actually a plumbing licensing fee. Is
[23:34]
that also It's only It's a couple grand.
[23:36]
Is that also some That would be okay.
[23:39]
I'm sorry. I should say it's A2501E
[23:43]
and down.
[23:48]
» So that's not your item.
[23:50]
>> Similar situation. Yeah. That belongs to
[23:52]
the water department.
[23:57]
» All right. Any other questions?
[23:59]
>> Yes. So that so it's kind of going back
[24:01]
to the electrical inspector um at having
[24:06]
to cut his salary in half because not
[24:09]
able to make um over 35 grand. So the
[24:13]
rest of so the remainder of that comes
[24:16]
out of fees for services. Correct.
[24:19]
>> Um I don't believe so. So, the third party will charge a fee for
[24:27]
the inspections that are done through
[24:30]
that third party firm.
[24:35]
» Hold on. So, so the third party firm
[24:40]
charges who for the
[24:43]
>> the applicant
[24:50]
» and who's the third party
[24:54]
that we're using right now? It's not
[24:56]
him, right?
[24:56]
>> Middle department. Middle department
[25:00]
inspection agency. NDIA. Okay.
[25:06]
Um, so I do have a question about
[25:10]
the stop work order fees. I think we may
[25:13]
have had a big discussion. So there's a
[25:15]
charge for the stop order and then
[25:17]
there's a another $75 charge to go along
[25:19]
with that which is
[25:22]
>> so an administrative fee is for any
[25:24]
violation that's issued.
[25:26]
>> So that's 75
[25:27]
>> $75 an administrative fee. Yes.
[25:30]
And then once the person actually comes
[25:32]
and gets their permit, you're charged
[25:35]
twice for that permit.
[25:37]
>> There is a Yes, there's a double permit
[25:40]
fee for a stop work order
[25:43]
>> even though that So they're getting
[25:45]
penalized twice. Then they're getting
[25:47]
penalized with the 500 for the stop work
[25:49]
order and then penalized by making them
[25:51]
pay the permit twice.
[25:53]
>> Yeah. So this is nothing new. many
[25:57]
more than many it's a large percentage
[25:59]
of municipalities handled that situation
[26:02]
the same way and uh that that is what's
[26:05]
set up in sky and it's been set up long
[26:08]
before I've been here
[26:10]
>> well it was brought to my attention
[26:12]
because somebody came to the bill and
[26:13]
said they tried to adise the same thing
[26:16]
I've never had a personal experience so
[26:18]
that's why I'm bringing it here because
[26:19]
I did not know that that was the case
[26:21]
>> so that's in the ordinance that um when
[26:23]
there's a stop order issued, there's
[26:26]
double permit fees. So, all all permit
[26:28]
fees are doubled when uh there's a stop
[26:31]
work order issued.
[26:34]
>> Okay.
[26:38]
» Any other questions?
[26:40]
>> So, just for a little clarity on this,
[26:42]
so the third party inspector
[26:46]
charges the applicant. So, and when when
[26:51]
this gentleman's under his $35,000
[26:53]
threshold, then that money comes into
[26:56]
the city as revenue. Correct.
[26:59]
>> Or how does this work?
[27:00]
>> The application fee goes to the city for
[27:02]
the Yes.
[27:04]
>> And when we have to outsource it,
[27:07]
whoever we outsource it to,
[27:10]
>> so when we do outsource it, inspection
[27:12]
fees on the charged. Mhm.
[27:16]
>> So the city does not charge when we're
[27:18]
outsourcing it to the third parties
[27:19]
directly, we do not charge a home owner
[27:22]
or the contractor fee. Correct.
[27:24]
>> So that fee is paid directly
[27:26]
>> to the third party. Yes. So we don't
[27:28]
generate no revenue.
[27:30]
>> Yes. Correct.
[27:30]
>> To offset that electrical inspection.
[27:33]
>> Correct.
[27:34]
>> You see permit people do that
[27:36]
inspection.
[27:36]
>> That's what I'm saying. That's why I
[27:37]
want to ask a question. People are still
[27:38]
paying a fee
[27:41]
for electrical permit.
[27:43]
If we so if we're collecting a fee for
[27:47]
that electrical permit then why do we
[27:49]
then why do they have to pay in a third
[27:51]
party they're double paying for the
[27:53]
service same service
[27:55]
>> they won't if we've paid if they paid
[27:57]
the city for that there's some reason to
[27:59]
transition where the MDI was billing the
[28:03]
city for the work that they were
[28:05]
providing
[28:07]
>> so then why are we charging an amount of
[28:08]
efficiency when they have to go to put
[28:11]
the party admin to work.
[28:14]
>> You have to pay the permit fee no matter
[28:17]
what to give it to the department.
[28:19]
>> If you
[28:22]
pay the inspector directly, you don't
[28:25]
pay the city. If it's build to the city,
[28:29]
then they're paying at the city. So,
[28:32]
we're paying MDI.
[28:34]
>> So, a a homeowner can go directly to
[28:36]
this agency for the permit for the
[28:40]
inspection.
[28:41]
>> An inspection, not a permit. not the
[28:42]
permit. Now, I'm trying to get to the
[28:44]
fee because people are being charged for
[28:47]
the application,
[28:49]
the permit fees, whatever we want to
[28:51]
call it, and then they're being they
[28:52]
have to pay the third party also.
[28:56]
So, there are inspection fees that would
[28:59]
when the city's handling the
[29:00]
inspections, there are inspection fees
[29:03]
that are included.
[29:06]
They're above and beyond the permit fee,
[29:07]
the application fee, if you will. uh
[29:11]
application fee and the permit fee are separate from the inspection fee.
[29:16]
>> So we're saying that we only charge in
[29:18]
the application fee.
[29:19]
>> Yes.
[29:20]
>> And not the the the fee associated with
[29:23]
the work what we call cost of work fee
[29:25]
and then the rest go to the third party.
[29:27]
So the third party is charging for the
[29:29]
cost of work and we just charging for
[29:31]
the application fee. That's 75 whatever
[29:33]
that fee is. I think it's more than that
[29:36]
>> 75
[29:37]
>> $75. So if I were to come to pull a
[29:39]
permit for electrical permit to the
[29:41]
city, I'm paying $75.
[29:43]
>> Yes, sir.
[29:44]
>> And then the third party, I have to pay
[29:46]
the third party for whatever inspection.
[29:49]
>> Yes, sir.
[29:49]
>> Should be careful at that premises.
[29:51]
>> Yes, sir.
[29:52]
>> If there's something you think is
[29:53]
inconsistent with that,
[29:55]
>> I will I I'm going to ask for a report
[29:57]
on that because I've been getting a lot
[29:59]
of complaint about people are paying the
[30:01]
city. I want to verify, but since we're
[30:04]
talking about it, I was going to bring
[30:06]
it up. I was going to put it in the
[30:07]
document here to send my question in. I
[30:10]
wanted to see that how much in the last
[30:12]
6 months or a year, how much 6 months,
[30:15]
this only happened a couple months ago.
[30:17]
How much homeowner or contractor have
[30:19]
been paid to the city for electrical
[30:22]
work, the cost of work and application
[30:26]
fee and how much was paid
[30:29]
or how much work was done by the third
[30:30]
party. Okay,
[30:33]
go ahead, please. And so
[30:36]
and my original qu earlier question was
[30:40]
do we pay out of fees for service to
[30:43]
that third party and you were saying he
[30:46]
said no we don't pay out of service for
[30:48]
the um for the third party. So my
[30:52]
question is if but the mayor was saying
[30:54]
that this third party will will build
[30:58]
city right they bill us but so if
[31:01]
they're billing us my question is if
[31:03]
they're billing us for providing a
[31:05]
service and then we're paying them for
[31:08]
the service but then the home the
[31:10]
homeowner or contractor is also paying
[31:12]
them. That's that's what I'm trying to
[31:15]
that's where it's just you know and I
[31:17]
have a pretty limited scope here so
[31:18]
that's why I'm asking these questions. I
[31:19]
appreciate you coming.
[31:22]
transition when he went from being a
[31:24]
city employee who can no longer work
[31:26]
here to keep him because of his skill.
[31:28]
>> That makes sense, right?
[31:30]
>> So there was some in the middle there
[31:32]
where
[31:34]
he started some some of the inspections
[31:37]
are more simple
[31:40]
>> like one inspection other projects where
[31:43]
it may be multiple inspections.
[31:46]
So for instance, there was a a
[31:48]
transition period
[31:50]
said um where there was open permits and
[31:54]
fees were already paid to the city.
[31:56]
Okay. And uh so to close those out um of
[32:01]
course the third party firm wasn't
[32:03]
getting paid. So, um, until those
[32:06]
permits were closed out, and they were
[32:08]
all new permits where we didn't charge
[32:10]
these inspection fees,
[32:13]
we were paying fees for services in the
[32:16]
beginning of the transition period. Now,
[32:19]
when that work was closed out and now
[32:22]
these are new permits without us
[32:23]
charging inspection fees, uh, we are not
[32:26]
paying for MDI main service. They are
[32:30]
the applicant is paying for their
[32:32]
inspections and they do not charge the
[32:34]
city for that. The applicants are paying
[32:36]
for their inspections similar to them
[32:39]
paying the city
[32:41]
>> and the applicants are paying the same uh I guess it would be on the
[32:47]
same pricing scale that the city uses.
[32:50]
>> It's very similar. Okay. The bottom line
[32:52]
would be very similar
[32:55]
>> to the applicant.
[32:57]
So you you mentioned just that we had in
[32:59]
this transition happened that there were
[33:01]
some old permits that the
[33:04]
homeowner or the contractor paid to get
[33:06]
this work done but we could have done
[33:08]
the inspection in house. So we had to
[33:10]
refer them to the third party. So since
[33:13]
that happened we reimburse them for the
[33:15]
cost of work fee not the application fee
[33:18]
the cost of work fee because they have
[33:19]
to hire the tour party. I don't think
[33:23]
anybody hired somebody.
[33:25]
>> We have open permits that was just
[33:27]
mentioned.
[33:28]
>> It's not old. They're open permits.
[33:31]
>> So the open permits they didn't pay
[33:33]
twice. So they didn't have to pay NBIA
[33:36]
for that.
[33:43]
» There's some questions. May I I I reach
[33:46]
out to you and the several of the
[33:48]
contractor wanted a meeting with you and
[33:50]
you says no
[33:52]
>> and that's why I'm bringing this up and
[33:53]
I I you know I'm vocal about this
[33:56]
department and things like that.
[33:56]
>> So you got to give me specifics.
[33:59]
>> I did give you specific and they asked
[34:01]
to meet with you and you says no.
[34:04]
>> Are there any other questions? Go ahead.
[34:07]
>> So just be I just want to get clear
[34:09]
because they keep talking about the
[34:10]
different ones. So 88 8664404
[34:13]
fat fee for services is MDIA.
[34:17]
>> Um
[34:19]
so it is not MDIA. So fees for service
[34:22]
is services code enforcement uses. Um it
[34:27]
could be um an engineering firm. It's um
[34:32]
it's our process server for uh serving
[34:37]
uh
[34:39]
for
[34:41]
uh appearance tickets. It is um car
[34:45]
washes for that matter. It is uh it's
[34:48]
fees for service in general. We use it
[34:50]
for any fees for services in code
[34:54]
enforcement.
[34:56]
>> So where are they being paid for? Go
[34:57]
ahead. You got it. I do um on back up on
[35:07]
» code enforcement clerk. So that's a
[35:10]
position that's been going to be.
[35:12]
>> I'm proposing to make that position.
[35:14]
>> Okay. I'm sorry. Probably said that
[35:20]
» are any other questions?
[35:22]
>> Go ahead, please. So um you're you're
[35:25]
voting for eliminate what what are the
[35:27]
first of all is it currently filled?
[35:29]
>> It's not.
[35:30]
>> And what are the responsibilities of
[35:32]
that particular position?
[35:33]
>> So it's a very entry level position.
[35:36]
It's uh
[35:38]
virtually answering phones and five
[35:43]
>> all important tests.
[35:44]
>> Yes.
[35:45]
>> So
[35:48]
where is that work being current if it's
[35:50]
not filled in yet? So that work is being
[35:53]
done by one of the other uh positions
[35:55]
that we currently have built.
[35:57]
>> It's being split up amongst
[35:59]
administrative staff.
[36:05]
» So in the last budget, was there
[36:07]
somebody in that position last year?
[36:10]
>> Um
[36:11]
there was. I don't remember the
[36:15]
chronology of what happened with that
[36:17]
position. We did hire um this year and
[36:21]
we had that position filled briefly and
[36:25]
that person uh is now an IPS3 position.
[36:33]
» So where does MDI get paid from?
[36:38]
>> Where where does MDIA get paid from? So
[36:40]
in the brief transition they got paid
[36:43]
from they are getting paid I I believe
[36:46]
this will be the last uh invoice that we
[36:48]
receive from them uh from fees for
[36:51]
service
[36:53]
but that line doesn't belong to MDIA
[36:57]
>> it's annual fees
[36:58]
>> it's for many different services
[37:03]
» so there's a breakdown of what MBA gets
[37:05]
in the car washes so there's a breakdown
[37:07]
what's paid out that line
[37:10]
find that out.
[37:13]
>> Yes,
[37:17]
I do have one more question. So the in
[37:19]
so you also um in full processing
[37:22]
special you had two now you're going
[37:25]
down to one.
[37:27]
>> Um yes
[37:29]
proposing to uh turn one into an IPS
[37:34]
board.
[37:38]
» Okay. So going from one IPS4 to two.
[37:41]
>> Yes.
[37:41]
>> Okay. Thank you.
[37:46]
» Are there any other questions?
[37:49]
>> Seeing none. Thank you so much. Have a
[37:51]
good night.
[38:28]
Okay, let's do central data processing
[38:31]
page 28 and then we'll do some
[38:34]
engineering
[38:38]
that is page 28 sections.
[38:57]
Central process page 28 1680 uh
[39:01]
totalations increased by 8.267 267
[39:05]
835,000
[39:06]
to 93,000 approximately a 69,000
[39:10]
increase
[39:19]
see
[39:22]
anything about open for questions.
[39:26]
>> Okay. Uh yes. So most of these increases
[39:29]
we have is from u input services. We u
[39:34]
consolidated some of the line items
[39:37]
which was uh in different department
[39:41]
you know it fix you know website
[39:44]
management and all those things were
[39:47]
from different departments and equipment
[39:50]
also. Uh so they put that in my budget.
[39:55]
So that's on the amount of
[40:02]
» question. Go ahead please.
[40:04]
>> Yes. So under the administrative
[40:06]
salaries 81680.
[40:10]
So we've had an IT specialist web master
[40:12]
and now they're being moved to the
[40:14]
junior network administrator. So looks
[40:16]
like done done away with that one on the
[40:19]
web master added the administrator at
[40:22]
the same salary.
[40:25]
Yeah. So what happened was the IT web
[40:29]
master person was there but the
[40:30]
individual
[40:32]
needs to take the exam. So civil service
[40:35]
asked us to drop him down or put other
[40:38]
position. So we made him a PC support
[40:41]
specialist.
[40:43]
But this individual has a higher skill
[40:45]
on that. So I'm trying to bring another
[40:48]
position again in next year at a little
[40:52]
bit higher value than 50 supports.
[40:56]
>> So are you saying that you're moving
[40:57]
them to the junior network administrator
[40:59]
that would
[40:59]
>> Yeah.
[41:00]
>> However, there's no increase in salary
[41:02]
that individual.
[41:03]
>> Um yeah, I do see that. So um a little
[41:08]
bit increase on that. So if we can
[41:12]
increase the 5 grand difference of the
[41:15]
support to this big
[41:24]
so they're currently support
[41:30]
um so they will be receiving an increase
[41:32]
the junior network administrator
[41:34]
position of 66,950
[41:37]
that we divide that will be subed by the
[41:40]
It's less than that for the
[41:42]
administrator.
[41:49]
» Yeah. Sorry. Please.
[41:51]
>> So you talked about how you are reducing
[41:54]
or adjusting this role within your
[41:58]
department and the way in which you did
[42:01]
that. Just a clear question of can you
[42:04]
talk about HR's involvement in that
[42:05]
process or are these sincerely just your
[42:08]
internal recommendations of how to
[42:09]
capture their skill set at the right
[42:12]
conversation level?
[42:13]
>> Yeah. Yeah. So actually we had three
[42:16]
position before with the PC list and one
[42:19]
with the IP master uh which was in early
[42:24]
2024.
[42:25]
That position was there but individual
[42:27]
left position in the middle of the year.
[42:30]
So I have
[42:32]
an individual from that position. He had
[42:34]
that skill set to do it.
[42:37]
>> Uh but he was supposed to take the civil
[42:39]
service exam which missed. So we had the
[42:43]
letter from service to drop him off on
[42:46]
the we had to take him off and put him
[42:49]
on the PC support because there was
[42:52]
position at the time. So uh this year I
[42:55]
managed to fit that position PC support
[42:59]
uh three right now there are four
[43:00]
individual on that I'm going to move
[43:03]
that individual to this uh new position.
[43:08]
» Okay. Um
[43:11]
the stipen
[43:12]
for 300 proposed it hasn't been proposed
[43:15]
be hasn't been before. Is that for you
[43:19]
getting up in the middle of the night
[43:20]
and going to computer to save us?
[43:23]
rightfully so.
[43:26]
>> Would that be pay for you? That's
[43:28]
>> lucky.
[43:32]
I believe that is for um the uh the
[43:36]
chief technology officer.
[43:38]
>> Okay.
[43:43]
[Laughter]
[43:47]
Um I'm just asking because the
[43:49]
assessment was just here and you know
[43:51]
last year we had um allocated $60,000 to
[43:55]
upgrade all the machines and how are you
[43:57]
with that in terms of upgrading all the
[43:58]
machine across all the departments.
[44:01]
>> Yeah, I appreciate you giving that
[44:03]
helped a lot. So we are 60 70% done
[44:08]
replacing the machine and because of
[44:11]
that like we don't have the
[44:14]
like in all staff and you know like I
[44:18]
how it works you know like there is not
[44:20]
enough time every day to do you know
[44:23]
like sometime we go do sometime
[44:25]
something comes up right so because my
[44:27]
guys uh you know still try to you know
[44:30]
accomplish school job so we have 70%
[44:33]
down And
[44:35]
>> yeah, but uh the funding you allocated
[44:39]
that will suffice to replace all those
[44:41]
machines we which we talked about
[44:43]
>> and your pace to get that done.
[44:45]
>> Yes.
[44:45]
>> Before the end of this year.
[44:46]
>> Uh before end of this month.
[44:48]
>> End of this month.
[44:50]
>> Yes.
[44:51]
>> Please. Yeah.
[44:52]
>> It's good that we have updated
[44:54]
technology because cyber security and
[44:56]
things that mean it's good to have that
[44:58]
know.
[45:00]
>> Yeah. Yeah. That helped a lot. Go ahead,
[45:03]
please.
[45:04]
>> So, the largest budget line, and if you
[45:05]
said this at night, I'm sorry. Your
[45:07]
largest budget line is A16804
[45:10]
fees for service.
[45:11]
>> That's your largest budget line, and
[45:13]
there's been somewhat of an increase
[45:15]
there.
[45:16]
>> Yeah. Yeah. From those increase mostly,
[45:18]
you know, like I said, you know, the the budget line was in different
[45:23]
department before.
[45:25]
>> It is it is in here.
[45:27]
>> So, like
[45:29]
fix the you know.
[45:31]
>> Okay. CD plus for the websites and also
[45:34]
we got this mobile device management
[45:36]
which is uh for the protection of the
[45:39]
you know mobile devices within our
[45:42]
organization cell phone or tablets those
[45:44]
things so that we done this year that is
[45:49]
also in that
[45:51]
>> and also
[45:53]
solution which is also
[45:55]
>> I'm sorry what was that
[45:56]
>> email filtering solution
[45:59]
you know spam filtering
[46:02]
those things we miss.
[46:04]
>> Thank you.
[46:07]
>> Are there any other questions?
[46:10]
>> You know, thank you for doing
[46:13]
keep us safe.
[46:16]
>> All right,
[46:18]
Mr. Wallen.
[46:31]
And that will be
[46:33]
page 22
[46:36]
public
[46:41]
increase 549%
[46:44]
9125,000
[46:48]
34 745.
[46:52]
Oh,
[46:53]
thank you for bringing that to my
[46:55]
attention. Capital
[47:04]
» um
[47:08]
so it utility.
[47:13]
» So if you can just walk us uh through
[47:15]
that is the capital budget your um
[47:18]
utilities and IT.
[47:20]
Uh, sorry.
[47:23]
>> I don't want to
[47:25]
>> It's on page 91
[47:28]
>> under capital budget.
[47:29]
>> That's all for utility.
[47:31]
>> Oh, that's for utilities. Okay. So, then
[47:32]
you're good. You're good.
[47:34]
>> We'll get you.
[47:39]
» All right. Sorry for that.
[47:47]
» Page 22.
[47:50]
Commissioner
[47:52]
Department and then we'll handle work.
[47:54]
So that's a and a brief
[47:58]
40 public works
[48:02]
approximately a $35,000 increase.
[48:06]
>> All right. Since you have multiple
[48:07]
departments here, we'll just go through
[48:09]
them individually. Um public works
[48:11]
admin, you want to walk us through
[48:12]
there. Anything that significant change
[48:14]
or increase that we need to know about?
[48:17]
No. Uh so I have two IPS in my
[48:20]
department or myself. So what I gave out
[48:21]
was it's a budget package. I put it
[48:23]
together this summary of the department
[48:26]
how it made up that over here in of the
[48:29]
presentation. Um so in this there isn't
[48:32]
any I went through it before there isn't
[48:34]
any changes uh in 1440
[48:38]
above what I had proposed originally but
[48:41]
I don't see anything there. if there's
[48:42]
any questions. So I can just tell you
[48:44]
that uh
[48:46]
1448 are the two texts I have IPS's and
[48:50]
we have our longevity and we go through
[48:52]
uh as we get into the uh 401 400 items
[48:56]
that are posted we still have some
[48:58]
posted it's not as much as you used to
[49:00]
be everything being digital uh
[49:02]
administrative expenses those are my
[49:04]
license renewals and I go to a
[49:06]
conference every year at Nikcom so we do
[49:09]
pay for that through there it's
[49:10]
relatively uh affordable conference
[49:12]
And then what we have is leases, Xerox,
[49:16]
RGis, civil 3D. So those leases that we
[49:19]
have under the fees for services. Then I
[49:21]
have uh city phone expense, uh supplies,
[49:24]
which boil down really department
[49:26]
overhead, paper, pens, $1,200, and then
[49:28]
maintenance contracts. And maintenance
[49:30]
contracts are actually city contracts
[49:32]
that are paid for. So we have anou with
[49:34]
the CDTA for $25,000 for ride share. We
[49:38]
have an easement with Amtrak uh for
[49:41]
public infrastructure and we have
[49:43]
infrastructure. We have DOT attraction
[49:45]
signs if you see on 890 say welcome
[49:48]
Central Park and then we have an
[49:50]
agreement with CPU rail um for the
[49:53]
lights on the bridge over. So that's all
[49:57]
in there. Those are all um those are all
[49:59]
kind of contractual in that paid for it
[50:01]
out of there. So 1440 is pretty much tax not
[50:09]
>> any questions on on this section. Go
[50:11]
ahead please.
[50:11]
>> Um under uh administration 144100 info
[50:17]
processing soft three. So there's like a
[50:20]
22% raise. Is that $10,000?
[50:24]
>> Okay. Thank you. And my second question
[50:27]
is
[50:30]
um under 144404 fees for services.
[50:37]
» Yeah, that was an adjustment. We were
[50:39]
actually having to do budget adjustments
[50:41]
at some point. So the Xerox license is
[50:44]
over 2500. I have an RGI license that's
[50:47]
5,000. Civil 3D license that's five. So
[50:49]
we were just making a correction for it
[50:51]
to make sure that we cover it. Any
[50:56]
questions? Go ahead, please.
[50:58]
>> So, I don't have a year date for me, but
[51:00]
so last year we adopted was 7500
[51:04]
>> and so you said you went over that so
[51:06]
that doesn't correct.
[51:09]
>> Yeah, you see the 2024 actual expenses
[51:12]
are $20,000,
[51:14]
>> but we're trying to correct it. It's
[51:16]
just to make sure everything's
[51:18]
representative correctly.
[51:19]
>> All right. Thank you.
[51:20]
>> Yep. Any other question on this section?
[51:23]
Seeing none, we'll move to page 23,
[51:26]
engineering, construction, and design.
[51:29]
>> Commissioner
[51:34]
page 23, 841,
[51:37]
total increase of 19.1%
[51:40]
33 increase.
[51:45]
» Um, so here we have assistant to the
[51:49]
city engineer. This is a position that
[51:52]
was previously held by Gary Fowl who
[51:54]
retired. Um it's position that I like to
[51:57]
have as it does not require a PE. Um the
[52:01]
PE is a difficult thing to hire for
[52:04]
because you either have someone who's
[52:06]
experienced who would want more than 95
[52:09]
or inexperienced who may want credit and
[52:11]
doesn't have a PD. So that kind of gives
[52:12]
us some flexibility. Also, it's at a
[52:15]
salary where if uh we wanted to change
[52:18]
that title in the future to something
[52:19]
that comes to consolidates budgeted if
[52:21]
we wanted to do something like uh but
[52:24]
before I had or you'll see in my notes
[52:26]
we talked about senior engineering
[52:28]
technician you know joins I saw your
[52:30]
comment about you know hiring an
[52:32]
engineer one of the things that we're
[52:34]
struggling with in engineering is we're
[52:37]
in this this middle ground a junior
[52:40]
engineer if you hire a junior engineer I
[52:42]
started as a junior engineer
[52:44]
And if you hire a junior engineer who
[52:45]
wants to be a PE, we don't offer enough
[52:49]
design experience to get your work PE.
[52:52]
So for instance, I left. I left for four
[52:55]
years. I got my PE and I came back. So I
[52:59]
don't see it being a long-term position
[53:02]
to hire someone who really wants to earn
[53:04]
their PE. Um, so then we were trying to
[53:07]
find people with a technical background,
[53:09]
someone that, you know, has a background
[53:11]
in construction and management, which is
[53:12]
really the majority of what we do, um,
[53:15]
that we could bring in would want a PE.
[53:18]
And that's where we were looking at a
[53:19]
senior engineering tech at one point,
[53:21]
which was in my notes, but the assistant
[53:23]
to the city engineer, um, we felt that
[53:26]
that's a better fit because it's
[53:27]
budgeted a little higher than senior
[53:29]
engineering tech and also scan doesn't
[53:31]
require.
[53:33]
Um so and then just to you know you know
[53:36]
be clear on this as well what's not
[53:38]
represented here and I also have in my
[53:40]
notes is the storm water control
[53:42]
officer. One of the things that I talked
[53:45]
about at a council meeting when I did an
[53:47]
update was the importance of the city
[53:50]
being prepared for all the new MS4
[53:52]
requirements and all the reporting and
[53:54]
inspections that go along with that.
[53:55]
Right now we're using a third party
[53:57]
engineering firm PT Mail to review and
[54:00]
handle all of it. It's a large
[54:02]
administrative lift to keep in
[54:05]
compliance. So that position is in storm
[54:09]
sorry in the sewer budget. Um and you
[54:11]
know I would wholeheartedly recommend
[54:13]
that it remain there. So while you're
[54:15]
only seeing um the assistance of city
[54:18]
engineer remaining here, you know that
[54:20]
position would most likely be put into
[54:23]
engineering office and they would work
[54:26]
with me. So that would be an extra body
[54:28]
as well. Um and like I said in my
[54:30]
narrative talks about we have a setup
[54:32]
now for seven seven people. Um this
[54:35]
would full this would budget the office
[54:37]
at six whereas right now I have four
[54:40]
full-time. So you know while it's great
[54:42]
to say it would be nice to have a seven
[54:44]
full staff. I mean having two more
[54:47]
people focused uh on engineering. I mean
[54:50]
that's that would be huge for the
[54:52]
department. So I don't want to uh go too
[54:54]
much outside that. If we can fill in the
[54:56]
MS4 officer with department of storm
[54:58]
water and then uh find a replacement for
[55:00]
Mr. Afall, I think that will um give us
[55:03]
a lot of uh a lot of help and
[55:06]
redundancy. The the hard part though to
[55:08]
your point is, you know, if I'm not here
[55:12]
that that kind of uh dependency on me as
[55:17]
the engineer. Um, and I don't know that
[55:20]
there's a chance that we could find
[55:22]
someone, but I'm not, you know, we've
[55:24]
been looking for engineers probably for
[55:25]
13 years. And it's not that we haven't
[55:27]
advertised. We advertise quite a bit.
[55:28]
It's just hard to to put it in
[55:32]
when there's so much competition out
[55:33]
there between Friday.
[55:37]
So, I'm like I said, I guess it's a
[55:39]
longwinded way of saying I'm comfortable
[55:40]
with this budget. uh given that the MS4
[55:43]
storm water control officers day because
[55:45]
that would be someone that would really
[55:47]
help me out with a lot of the workload
[55:49]
that's coming.
[55:50]
>> So Chris, you still you still use a
[55:53]
consultant to help you with projects?
[55:55]
>> Oh yes. So I have uh I started five
[55:59]
years ago I started doing term
[56:01]
agreements. Um, so I have a term
[56:03]
agreement with most 10 private firms and
[56:06]
the term agreements allow us to kind of
[56:10]
backfill professional services that we
[56:12]
need. So whenever there's something that
[56:14]
comes up be an emergency or a project
[56:16]
that's under a certain amount, I think
[56:18]
about professional services that one of
[56:20]
them uh seek mail or MS4. Um and I think
[56:23]
that will always be the case because we
[56:26]
just don't have uh even myself I don't
[56:28]
have the the time expertise to do a wide
[56:31]
range of projects that we do in
[56:33]
engineering. You know we have on our
[56:35]
turn agreements architects, traffic
[56:37]
engineers, electrical engineers,
[56:39]
mechanical engineers because remember
[56:40]
it's not only uh roads we do all the
[56:42]
buildings and facilities. So we have a
[56:44]
lot of people that we that we rely on
[56:46]
that keep everything together. So with
[56:48]
these consultants on board and with the
[56:50]
staffing that you currently have here at
[56:52]
the key level with uh with all the
[56:55]
projects that you have currently
[56:57]
>> next year will be exceptionally busy
[57:00]
year because it'll eventually be the end
[57:04]
of a big jump right the money is kind of
[57:08]
run out right so those projects are done
[57:10]
but next year we're going to have um the
[57:12]
DRRi money that all money is being spent
[57:15]
next year on some of those projects but
[57:16]
That's around $6 million in BRRI and
[57:19]
then they got credit tree which is being bid at the end of the year and
[57:23]
that's a $13 million project. So that's
[57:24]
bigger than here. Now I am going to have
[57:27]
support because those projects do allow
[57:29]
me to hire construction inspectors but
[57:32]
still a lot. So that this will be a
[57:34]
extremely busy year with those projects.
[57:37]
We always have the paving project going
[57:38]
on and then after that really the
[57:40]
largest project after that is going to
[57:42]
be Crane Street Bridge. Um and that is
[57:45]
just going to be a long that will very
[57:48]
inflated but it does have an impact on
[57:50]
>> talking about paving I want to commend
[57:52]
you publicly for central parkway uh well
[57:56]
done and homeowners are really
[57:58]
appreciated some complaints that we have
[58:00]
to address with you but I think it's
[58:02]
minor that myself and uh Patrick but I
[58:06]
don't think it's it's a big of a deal
[58:08]
but we'll address with you okay
[58:09]
>> but I want to thank you for that
[58:11]
leadership in bringing that project to
[58:13]
where it is successful and that's a So
[58:16]
many years of planning back and forth co
[58:20]
is there people like that.
[58:23]
>> Well, I also have been meaning to email
[58:25]
you over the last few days to thank you
[58:27]
for Union Street which also was just
[58:29]
beautiful. Although I have gotten one
[58:31]
complaint that it's hard to stay at 25
[58:34]
now.
[58:36]
Before you had to avoid all the potholes
[58:38]
and now you can just, you know, zoom up
[58:40]
Union Street. So that's a good a good
[58:42]
problem to have. But it's I I've been
[58:44]
meaning to to thank you and write to you
[58:46]
over the last few days and I just
[58:47]
>> it's can discuss with it has to do with
[58:50]
the island
[58:51]
>> what happened the stone and the turf.
[58:55]
>> Yeah they can
[58:58]
something that they can be addressed.
[59:00]
>> Yeah we're going to be we're going to be
[59:01]
addressing now that it's turf season.
[59:03]
We're also um we kind of were waiting if
[59:06]
you notice the um old light poles are
[59:09]
still in place. Yeah,
[59:10]
>> National Grid has to remove those
[59:12]
themselves. So, we just I literally have
[59:14]
it in my desk yesterday, uh, an
[59:16]
agreement from National Grid. They're
[59:18]
going to come and remove those. They're
[59:19]
going to have to remove the poles and
[59:21]
the foundations. And then, yeah, we when
[59:23]
that project ended, it was in the the
[59:26]
middle of the biggest heat wave that you
[59:28]
had.
[59:28]
>> So, planning the grass, all you had to
[59:30]
establish.
[59:32]
So, we are going to have to go back
[59:34]
through and and do that. Now's a good
[59:35]
time. We're doing the ground part. But
[59:38]
now at the time it was
[59:39]
>> I think we preemptive because we did
[59:40]
full but you're not going to leave like
[59:42]
that.
[59:42]
>> No we did because we have known you over
[59:46]
the years to not do things like that. So
[59:48]
we did tell we did make that very clear
[59:50]
to them that you are more than likely
[59:51]
coming back
[59:55]
» and then we did mention about the
[59:56]
international
[59:57]
>> and the lights came on.
[59:59]
>> Yeah.
[59:59]
Absolutely.
[1:00:02]
Actually, I'm just going to also say in
[1:00:04]
looking over um the purchase orders uh
[1:00:09]
summary, well, detail actually that we received I think today, maybe
[1:00:14]
yesterday, I can't remember. Um the I
[1:00:17]
was noticing just how many different
[1:00:19]
firms you do have to interact with
[1:00:22]
because of the various consultants. So,
[1:00:24]
you know, I can imagine that that's
[1:00:26]
complex also. So, I think again to add
[1:00:28]
to what Mr. Mutter and saying it's great
[1:00:30]
that you have so you know you have very
[1:00:32]
strong relationships with these various
[1:00:35]
>> that was that was the point of the sheet
[1:00:38]
it was a sheet that I included in the
[1:00:39]
package just to
[1:00:41]
show the amount of internally externally
[1:00:45]
that that uh city department of
[1:00:48]
engineering lead on work with someone
[1:00:52]
that's that's
[1:00:54]
right residents you know residents there
[1:00:57]
6,000 of them And then we got this is
[1:01:00]
just a current snapshot of food cuz it
[1:01:02]
does rotate. But um yeah, without the
[1:01:04]
consultants and contractors, we know
[1:01:06]
that we couldn't we couldn't do it. And
[1:01:09]
I also have Steve Bruce back to help
[1:01:11]
hard times. See, you know, 30 plus years
[1:01:14]
experience with the city.
[1:01:15]
>> Great.
[1:01:17]
>> Go ahead.
[1:01:18]
>> Thank you. Um Mr. When does the paving
[1:01:20]
schedule come out by 2026?
[1:01:23]
I'm anticipating doing some more roads
[1:01:25]
off a Union Street.
[1:01:26]
>> We're working on the paving schedule
[1:01:27]
now. Yeah.
[1:01:28]
>> Um I don't have it I don't have it
[1:01:31]
developed now. Usually we don't bother
[1:01:32]
having we don't have it all together
[1:01:34]
until February. Okay.
[1:01:35]
>> But we had an internal meeting. We're
[1:01:37]
starting the book. Um I know one of the
[1:01:38]
big roads we're looking at this year is
[1:01:40]
Frank Street. Um you know in
[1:01:43]
anticipation of doing the bridge over
[1:01:44]
but we thought that we did that and I
[1:01:47]
can look at some rows off the Union but
[1:01:49]
you know we're really always trying to
[1:01:50]
focus on main times. That's what I drove
[1:01:54]
looking at bridge. I'm like yeah it's
[1:01:56]
time for this. You know, we also try to
[1:01:58]
partner. If you noticed, uh, we worked
[1:02:00]
with the Sent City School District. We
[1:02:01]
did the roads around the Steinments
[1:02:02]
Academy. We're more than grateful about
[1:02:04]
that. We did the roads around Mount
[1:02:06]
Pleasant. We're also, um, next year
[1:02:09]
the mayor sign off might be a minorly
[1:02:12]
different paving where I'm looking to
[1:02:14]
try to do some of my larger nuisance
[1:02:18]
projects. So, um, we have some areas
[1:02:21]
like, um, in front of, uh, by Mount
[1:02:25]
Pleasant and tennis courts, there's an
[1:02:27]
area there where we have a triangle.
[1:02:28]
We're looking at redoing that. We've had
[1:02:30]
some accidents, uh, in that area, and
[1:02:33]
we're looking to reconfigure the ropes
[1:02:34]
there. We also have some areas that are
[1:02:36]
concrete roads, specifically Michigan
[1:02:38]
Avenue and Almont Avenue by 890. It's uh
[1:02:42]
concrete roads that are in rough shape,
[1:02:44]
you know, and uh looking to do um Gulf
[1:02:47]
Road, add an official turn lane at the
[1:02:50]
cross town right now. It's kind of one
[1:02:51]
and a half lanes. It's a little little
[1:02:53]
tricky there. We have a plan for that.
[1:02:55]
Also going across and uh cleaning up the
[1:02:58]
entrance to the golf course. Um and then
[1:03:00]
we're working with uh you know, Mike
[1:03:01]
Sesnney on a bunch of areas. The big
[1:03:03]
thing that we also are trying to do when
[1:03:05]
we have our paving program is eliminate
[1:03:07]
areas of icing. So we have some lowline
[1:03:10]
areas. We have an area in Woodan right
[1:03:12]
now that we're working with connecting
[1:03:13]
municipal housing on Mville with roadis
[1:03:16]
because it's low. We're looking to do a
[1:03:18]
project there to raise the road because
[1:03:20]
the less uh icing that we have on the
[1:03:23]
road, the less work for our DPW crews
[1:03:25]
because it is a specific focus where
[1:03:27]
they have to birth dispatch ice
[1:03:30]
locations. Um, another one we just are
[1:03:32]
doing now is on rugby bowl plot. You see
[1:03:35]
a little corner work we're doing there
[1:03:37]
that ended up being some icing and some
[1:03:39]
flooding areas that we have there. But
[1:03:41]
we're trying to pick away at it. But I
[1:03:43]
will have a an idea more towards
[1:03:46]
January. Right now we're just wrapping
[1:03:48]
up talking about
[1:03:50]
normal part to the tennis court. That
[1:03:54]
section was the others were paid but
[1:03:56]
that section was um not paid. Is there a
[1:03:59]
reason why that part turned into tennis
[1:04:02]
court here?
[1:04:03]
>> That's the area I'm talking about. So,
[1:04:05]
>> so we stopped while we're designing that
[1:04:08]
entire area with the triangle is going
[1:04:11]
to be re reconstructed
[1:04:13]
>> from our turn all the way up to
[1:04:15]
>> Right. Correct. All from there up to not
[1:04:18]
right up to the exit ramp but up ways.
[1:04:21]
If if you were not if there's a pet
[1:04:24]
basin that's in disrepair and there's a
[1:04:26]
very awkward triangular island um that's
[1:04:29]
not the right side. So we're going to try to clean up that.
[1:04:31]
>> You're talking about the cat basement in
[1:04:33]
that circle right by Pennsylvania
[1:04:36]
>> Skyler.
[1:04:38]
Yeah, that area right there.
[1:04:40]
>> Thank you. Y
[1:04:42]
>> um so I do want
[1:04:43]
>> No, you
[1:04:45]
>> um I do see that traffic counting was
[1:04:47]
cut from your budget.
[1:04:49]
>> Yes.
[1:04:50]
>> Okay. So, what what are we doing to
[1:04:52]
address these stop signs and these
[1:04:53]
issues with residents in the city? How
[1:04:56]
would you think when we go with that? Do
[1:04:58]
we have any money in the budget next
[1:04:59]
year?
[1:05:00]
>> That's what I was That's why I made a
[1:05:02]
note of it. is that I don't specifically
[1:05:05]
have the money in things budget for. Um,
[1:05:08]
and I look what I, you know, I I uh what
[1:05:12]
I'm trying to do is itemize the budget a
[1:05:15]
little bit so that it kind of takes some
[1:05:17]
of the nuance and pressure off of
[1:05:19]
everything. It's that, you know, um, I
[1:05:22]
looked at the city of Alby's budget.
[1:05:24]
is similar to
[1:05:26]
ours, but like I say, they spell out
[1:05:27]
everything. So when we get CHIPS money,
[1:05:29]
we paid for Chips money. same we uh you
[1:05:32]
know we separated chips and CDBG trying
[1:05:34]
to focus. So um so the idea behind that
[1:05:39]
was that we would put x amount of
[1:05:42]
dollars into what Alman would call speed
[1:05:46]
mitigation traffic mitigation and they
[1:05:48]
dedicated uh million to $2 million a
[1:05:51]
year to it and that's how they put in
[1:05:53]
their their traffic humps and speed and
[1:05:55]
all those things. They use that funding
[1:05:57]
not the chips funding and they actually
[1:05:58]
had a line called traffic. So I kind of
[1:06:00]
copied that and put the amounts in. But
[1:06:03]
you know given the situation that we
[1:06:04]
have you know fiscally was you know
[1:06:07]
those were some of the first things that
[1:06:08]
we looked at to say we haven't done this
[1:06:10]
in the past now really the best time to
[1:06:12]
start. Um it's not to say that we can't
[1:06:15]
put in stop signs and do some work with
[1:06:17]
chips money is possible. It's just the
[1:06:20]
idea that
[1:06:22]
the budget to what we would like to do
[1:06:25]
and not budget in this shop manner of
[1:06:28]
we're going to tell the city engineer
[1:06:30]
what we think and he's going to have to
[1:06:31]
figure out how to pay for it. You know,
[1:06:33]
it's that if the city would like to see
[1:06:37]
the creation and the installation of
[1:06:38]
speed humps, then we have to put
[1:06:42]
something in the budget similar what we
[1:06:43]
did with the sidewalks that says is that
[1:06:45]
we believe that we need to do this. will
[1:06:46]
put in x amount of dollars for me to do
[1:06:49]
that and if it's not in the budget so that I'm going to continue to
[1:06:54]
do the base work
[1:06:56]
>> and and I've appreciated and trusted
[1:06:58]
your response Mr.
[1:07:00]
on and all the work we do. It's got to
[1:07:02]
be overwhelming for me on a daily basis,
[1:07:05]
but thank you for it too. Um, so I know
[1:07:07]
I've been working for years, some of us
[1:07:09]
have on Kingsville and Rosby Road and um
[1:07:12]
places like that. So we just want to
[1:07:14]
make sure that that's you know
[1:07:17]
that fact moving forward that that's
[1:07:20]
something that we really want to propose
[1:07:22]
for coming.
[1:07:25]
>> So
[1:07:27]
Mr.
[1:07:28]
U actually
[1:07:31]
Um, I hear everything all the
[1:07:34]
conversation just took place and I'm
[1:07:37]
increasingly worried that Mr. Wallen is
[1:07:41]
the sole engineer functioning with all
[1:07:44]
this knowledge and information at the
[1:07:46]
city.
[1:07:47]
There's nothing to stop him from
[1:07:49]
choosing tomorrow to transition to
[1:07:51]
another municipality or work workforce.
[1:07:53]
We've seen that happen. Um, and
[1:07:58]
in his absence,
[1:08:00]
how does the city function where a lot
[1:08:02]
of the projects and I appreciate our
[1:08:03]
conversations, they require that
[1:08:05]
historical context to understand how to
[1:08:07]
mitigate some unforeseen issues that you
[1:08:09]
just wouldn't know if you weren't here 5
[1:08:11]
years ago. And that's why I appreciate
[1:08:13]
the two legit knowledge of Mr.
[1:08:15]
supportive field just calling those out
[1:08:18]
because having a source reference
[1:08:19]
knowledge is important to understand
[1:08:21]
that we don't repeat some lessons
[1:08:23]
learned that just aren't captured with
[1:08:26]
um newer individuals at the table. Um
[1:08:29]
but for the amount of time that I've
[1:08:32]
been on the council, we just continue to
[1:08:33]
hear how it's difficult to provide a
[1:08:36]
support or a secession. Um if you
[1:08:40]
wouldn't mind. Um but sincerely it needs
[1:08:42]
to be a hyperfocus
[1:08:44]
uh because to me a number of the
[1:08:46]
projects that were just identified at
[1:08:48]
the table those would fall into the work
[1:08:49]
task in excess of the core operations.
[1:08:52]
Um we talk about mental health in the
[1:08:55]
workplace. I the thought of you being so
[1:08:59]
cautious the time you take away from
[1:09:01]
your job because of how it will halt for
[1:09:04]
how it will halt operations at the city.
[1:09:07]
I would imagine that is a component of
[1:09:09]
your consideration. And I hope that at
[1:09:10]
this stage in your career, you
[1:09:11]
understand you have to step away at
[1:09:13]
times. Um, but again, with respect to
[1:09:17]
engineering, you just keep asking for
[1:09:18]
more and more and more and more. And
[1:09:20]
it's with good good measures like safety
[1:09:22]
considerations, paving schedules,
[1:09:24]
they're things that matter to the
[1:09:25]
community. Um, but even with the fee for
[1:09:27]
service line, I shadowed your department
[1:09:29]
for a brief moment and I felt like I was
[1:09:31]
taking away your time. Um, but even for
[1:09:33]
the projects that you're not managing
[1:09:35]
directly, you're indirectly managing
[1:09:37]
them because a member from your office
[1:09:39]
has to sign off phone at the end of the
[1:09:41]
day. Um, so I would even say that that's
[1:09:43]
double the work. Um so although we can
[1:09:47]
align the budget, there needs to be an
[1:09:50]
emphasis from within city hall because
[1:09:52]
again that is a big shortfall and I do
[1:09:55]
not want to see us continue down this
[1:09:56]
path of having individuals with uh so
[1:09:59]
many different varying responsibilities
[1:10:01]
that sometimes exceed their immediate
[1:10:03]
role set and as we replace them we now
[1:10:06]
have to decouple all these things and
[1:10:08]
it's more difficult. Um, so I see this
[1:10:10]
is as a a crossroad for us and I hope
[1:10:14]
that we can address this move forward
[1:10:15]
and I hate the word hope because we have
[1:10:17]
to figure it out eventually, but to me
[1:10:19]
it doesn't seem like we are. Um, so I
[1:10:22]
can thank you and we can all thank you
[1:10:24]
for what you do. Um, but until we
[1:10:25]
provide you some supports, it this is a
[1:10:28]
ticking timeline and I am one of a lot
[1:10:32]
of members in our community that have
[1:10:33]
moved back with the hopes of putting
[1:10:36]
some supports or with the hopes that
[1:10:38]
this will still be here and I don't want
[1:10:40]
to see your good efforts fall by the
[1:10:42]
wayside because of our poor plan.
[1:10:48]
» Well said that as well.
[1:10:51]
>> Yes,
[1:10:52]
>> you're not going anywhere.
[1:10:55]
But yes, you need you need support staff
[1:10:57]
to help you out.
[1:10:59]
>> Agreed.
[1:10:59]
>> What we are trying to do in the
[1:11:01]
department having another IPS's help is
[1:11:04]
we are trying to utilize
[1:11:07]
technology and and organizationally
[1:11:09]
we're trying to in case anybody were to
[1:11:11]
walk in there. It is, you know, Steve
[1:11:13]
spend six months organizing files and
[1:11:15]
scanning and working with it just to try
[1:11:17]
to make it um so that if someone were to
[1:11:19]
come in, they would not be just
[1:11:21]
inheriting, you know, I inherited a desk
[1:11:23]
with a lot of paper on it. You know,
[1:11:24]
we're trying to track things
[1:11:25]
differently. And I do think it helps
[1:11:27]
when you have things um more itemized
[1:11:30]
like what we're talking about. That way
[1:11:32]
you can just see these are at hand. Um,
[1:11:35]
and like I I really do think that with
[1:11:37]
the end of the ARPA and the DR, which I
[1:11:40]
hope I think that might have been a lot
[1:11:41]
of funding, you know, we had a lot of
[1:11:43]
projects in a very short amount of time
[1:11:45]
and we didn't, you know, increase staff
[1:11:47]
to handle it. It was just a lot going
[1:11:48]
on.
[1:11:49]
>> Um, I I think maybe we'll get back to
[1:11:51]
some kind of normality, but I appreciate
[1:11:54]
it. I mean, we would I would like to
[1:11:56]
have one here, but the issue is I just
[1:11:58]
don't want to sit here and say that, you
[1:12:00]
know, 13 years without having another PE
[1:12:02]
that in this fiscal budget that this is
[1:12:05]
the year that we really need a PE and
[1:12:08]
that if I walk away that the city's
[1:12:10]
going to be doomed. You know, the city's
[1:12:11]
been here for a very long time and, you
[1:12:13]
know, everybody's managed to figure it
[1:12:15]
out without me and without, you know,
[1:12:17]
it'll keep going on. You know, it's
[1:12:19]
government. It's it's it'll just be a
[1:12:22]
little bit more inefficient, I guess.
[1:12:27]
I'm talking about paving residential
[1:12:29]
paving removed from your your office.
[1:12:32]
Sorry, under your control. It's now
[1:12:34]
under residential
[1:12:38]
inspection that is completely under
[1:12:40]
code. Correct. So, um several years ago,
[1:12:44]
um what we decid what we we decided for
[1:12:45]
efficiencies was that you know anything
[1:12:49]
that affected a private parcel. So if it
[1:12:52]
was on a private property then that work
[1:12:54]
would just go to codes because you know
[1:12:56]
technically engineering different you
[1:12:58]
know I I'm usually in my staff are in
[1:13:00]
the rightway we don't have badges we
[1:13:01]
don't have authority to go on the
[1:13:02]
private property technically I'm sure
[1:13:04]
there's some something in there that
[1:13:06]
says I could but we like we changed the
[1:13:08]
structure years ago to be that if a
[1:13:11]
permit had to do with anything that was
[1:13:13]
on a private property such as you're
[1:13:16]
paving your driveway but uh I had a
[1:13:19]
review in the past from municip If it's
[1:13:22]
a curve cut, if sidewalks, anything in
[1:13:24]
the right that the check and I do get
[1:13:26]
that call from code officers that say
[1:13:28]
it's a new curb cut, does this curb cut
[1:13:30]
mean city standard? And then I will
[1:13:32]
review it and check. But if it's just
[1:13:34]
someone wants to retake the driveway, I
[1:13:36]
don't I don't have to
[1:13:39]
that has been done.
[1:13:41]
>> Well, you're completely out of
[1:13:45]
» You're completely out. Yeah, that I mean
[1:13:47]
and that's what I get again is that like
[1:13:49]
the uh the core operations part of it,
[1:13:51]
you know, if you were if you were to
[1:13:53]
look back these for years, you know,
[1:13:55]
where it says permanent issuance
[1:13:57]
inspection, there used to be six there.
[1:14:00]
>> Sidewalk, painting, all that. Anything
[1:14:02]
that had to do with a residential or
[1:14:04]
commercial property, those were
[1:14:06]
transition to codes. And I now have
[1:14:08]
revocables, which are things in the
[1:14:10]
right way, uh and the small warehouse
[1:14:12]
facilities, which are also things in
[1:14:14]
right away. So I handle anything that's
[1:14:16]
in the city's right.
[1:14:19]
» Also just back to the budget cut. Sorry.
[1:14:22]
When you say cut from budget, is it
[1:14:24]
because that something you removed based
[1:14:25]
on needing to cut that amount or was
[1:14:28]
that something that you asked for and it
[1:14:30]
was removed?
[1:14:31]
>> You talking about the position? Um
[1:14:33]
actually specifically talking about um
[1:14:36]
the MSN MS4 requirements and traffic
[1:14:40]
and well like I said it was the MS4
[1:14:44]
requirement was a something that I spoke
[1:14:46]
with mayor finance about uh regarding
[1:14:48]
copying the Ithaca way of doing things
[1:14:51]
and requires a a new fee and creation of
[1:14:54]
it but there's a lot of complication to
[1:14:55]
that. So it's something I'm going to
[1:14:56]
continue to work on with Derek um
[1:14:58]
because it is a it is a large be a large
[1:15:01]
implementation. So we decide not to go
[1:15:03]
forward. Traffic timing like I said in
[1:15:05]
the parking study those were singular
[1:15:07]
capital lines. They were not in the
[1:15:08]
operating budget. They could go in the
[1:15:09]
operating budget but those were things
[1:15:11]
that were in the capital. But once again
[1:15:13]
is that this is a tight budget. So they
[1:15:17]
were they were wanted to have them in
[1:15:19]
there to show that we talked about these
[1:15:21]
things. I added the budget but you know
[1:15:23]
we had to have some discussions when we
[1:15:25]
get to our capital about things that are
[1:15:27]
you know more important than that. And
[1:15:29]
there may be some ways around it, but
[1:15:31]
also it would be great if you know I
[1:15:34]
guess we didn't, you know, off the focus
[1:15:36]
of trying to do so much, you know, and
[1:15:38]
that's that's the thing is that in the
[1:15:40]
city the Craig Street project and
[1:15:43]
putting four stop signs up sometimes
[1:15:45]
take just as much time. Know there's a
[1:15:46]
lot of conversations that need to happen
[1:15:48]
with both of those projects. So there are time cons,
[1:15:54]
you know, this is this is the city's
[1:15:55]
budget. It's not my budget.
[1:15:58]
back.
[1:16:01]
>> Are there any other questions?
[1:16:04]
Okay, seeing none,
[1:16:08]
I think a couple other departments uh
[1:16:10]
except for adult.
[1:16:11]
>> Yeah, we can go through all the lines.
[1:16:13]
I'll just let you know 14 is the
[1:16:14]
administrative APWA news. Uh county
[1:16:18]
split news that is the 402 lines fees
[1:16:21]
for services. That is what I do use to
[1:16:23]
pay for consultants when it comes time
[1:16:25]
for I need third party services. Um so
[1:16:29]
that line I would appreciate remaining.
[1:16:30]
You can see the one year was very high.
[1:16:32]
We got a we had to do some transfers but
[1:16:34]
then what we did is that wasn't new with
[1:16:36]
staff. We moved some staff money to
[1:16:38]
there and that's what we did but I'm
[1:16:40]
comfortable with that number. And then
[1:16:41]
like I said the rest of it is is small.
[1:16:44]
It's uh cell phones uh training and then
[1:16:46]
once again
[1:16:56]
section
[1:16:59]
all yours capital
[1:17:03]
your engineering department
[1:17:08]
buildings and come back and fill up the
[1:17:12]
lab and
[1:17:28]
So page 91
[1:17:34]
bottom section
[1:17:37]
and the next page. Mhm.
[1:17:42]
Just one sure
[1:17:46]
the first one electric vehicle charging
[1:17:49]
stations. What we're looking to do is
[1:17:51]
currently we have five charge point
[1:17:54]
charging stations. They were installed
[1:17:56]
over 5 years ago. Um we've been having
[1:17:59]
some issues with the annual maintenance
[1:18:01]
fees on them and some of the
[1:18:03]
repairability. um our facilities
[1:18:05]
department um asked that uh we
[1:18:08]
transition those to link well the
[1:18:10]
stations that we've been putting in
[1:18:12]
lately. Um we have some right in back
[1:18:14]
city hall. We're also putting some in at
[1:18:16]
the golf course. There's two and some
[1:18:18]
other areas in the city. We have both
[1:18:20]
stations going in. So this is to replace
[1:18:22]
the existing stations and put in a
[1:18:24]
couple new stations for electric vehicle
[1:18:27]
charging. The next fire station
[1:18:30]
improvements. So that is I had three
[1:18:33]
improvements. So we did a lot of work to
[1:18:36]
fire station one replace their APA
[1:18:39]
heating system
[1:18:41]
really successful project. They also had
[1:18:43]
a uh whole house generator but in doing
[1:18:46]
that what we have now is they have a
[1:18:48]
console on the front of their building.
[1:18:51]
Um the console used to be where dispatch
[1:18:53]
was now we moved to a central dispatch
[1:18:54]
but that console remains. It is a very
[1:18:57]
large hardwired console. uh and it's
[1:19:00]
taking up space. It looks like something
[1:19:03]
from NASA via Houston. We have a
[1:19:06]
problem. I mean, it is an old
[1:19:09]
and so we have uh some folks to remove
[1:19:11]
that and refurbish that room so they can
[1:19:13]
turn it into uh more administrative
[1:19:15]
spaces. Uh we're also looking at doing
[1:19:18]
the roof uh at station two and at
[1:19:21]
station 4. So that is fire station
[1:19:25]
improvements, parking kiosks. Um, I know
[1:19:29]
as we're transitioning to Lazo, but we
[1:19:31]
have a lot of outdated kiosks around the
[1:19:35]
world. We doing even though we did
[1:19:36]
upgrade some, we have a lot of uh kiosks
[1:19:39]
that really need to be upgraded with the
[1:19:40]
new displays. So, this is to buy, I
[1:19:43]
believe, 10 new kiosks and locate them
[1:19:45]
in our busier area, do a whole
[1:19:47]
reshuffleling of a kiosk working with
[1:19:50]
the uh PD department. Um, paving that is
[1:19:53]
our general paving fund. That is in
[1:19:55]
addition to chips. um that is for work
[1:19:58]
that is not chips eligible. It is really
[1:20:01]
useful to have uh funds dedicated to
[1:20:03]
paving for nonchips eligible work
[1:20:06]
because chips does have requirements.
[1:20:08]
The next one um replacement of green
[1:20:11]
houses at Central Park. Um we have two
[1:20:14]
green houses at Central Park that are
[1:20:16]
dating back to 1950s. They are our last
[1:20:18]
green houses with antlated controls.
[1:20:21]
We've installed uh a new teaching
[1:20:23]
greenhouse with a grant that we got from
[1:20:25]
Brookley for set. That greenhouse is a
[1:20:28]
polycarbonate greenhouse. It is
[1:20:30]
phenomenal. Their production has doubled
[1:20:32]
using the greenhouse
[1:20:34]
>> and um instead of investing money into
[1:20:38]
those old green houses and I were like
[1:20:41]
done. So we're looking at uh new two new
[1:20:45]
green houses that are polycarbonate that
[1:20:47]
will use their automation system. Um the
[1:20:50]
green houses will be almost identical
[1:20:52]
size but more configured for production
[1:20:54]
just longer traditional green houses. Um
[1:20:58]
so that's one of them and then signage
[1:21:00]
which is central park signage. So we've
[1:21:04]
been working for well over two years on
[1:21:06]
uh installation of signage wayfinding
[1:21:09]
signage in Central Park and um I spoke
[1:21:12]
with Derek about it. I hope you're using
[1:21:14]
general paving funds because we do
[1:21:16]
signage with general paving. However,
[1:21:19]
since we're not paving all the roads
[1:21:21]
around the park because we've had them
[1:21:23]
come, it's uh safer to council just to do it this way. These are, you know,
[1:21:29]
not street signs. These are decorative
[1:21:31]
signs similar that you would see in a in
[1:21:33]
a state park that would be placed at the
[1:21:35]
main entrances around the park. Um it's
[1:21:38]
good timing for it because now
[1:21:39]
everything's kind of set where it is. Um
[1:21:42]
we know where everything's going to be.
[1:21:44]
So, that is uh the next one. So those
[1:21:47]
were the uh the replacements for
[1:21:52]
>> So we do have some signage around
[1:21:54]
Central Park replace those
[1:21:58]
>> any signs that was like rose garden
[1:21:59]
signage that's going to remain that were
[1:22:01]
privately funded that rose garden
[1:22:02]
signage. This is more weight finding.
[1:22:04]
It's actually going to be outside around
[1:22:06]
the perimeter of the park of not so much
[1:22:09]
on the interior to make sure that people
[1:22:10]
know where the pool is, where to park um
[1:22:13]
where you know where to park for a
[1:22:15]
diamond and b diamond connect the
[1:22:17]
educational environmental community. We
[1:22:18]
want to make sure people know where that
[1:22:20]
is. So we have a plan um and we're ready
[1:22:23]
to go. It's just that we need the
[1:22:24]
funding.
[1:22:28]
» Okay. Something happened in the last
[1:22:30]
year to year before. We did some work
[1:22:32]
for the greenhouse with a bathroom or
[1:22:34]
something like that.
[1:22:36]
>> We did install a bathroom. Yes, we've
[1:22:37]
installed a composting bathroom with a
[1:22:39]
grant.
[1:22:39]
>> Was it last year?
[1:22:40]
>> Two years ago.
[1:22:42]
>> No, the greenhouse is I mean it really
[1:22:45]
is an asset to the city. I encourage
[1:22:47]
anyone to go. Um, and if you would like
[1:22:50]
to see what that new does, um, it's
[1:22:54]
unbelievable what they can do with
[1:22:56]
actually climate controlled all
[1:22:57]
computerized and to show us some of some
[1:23:00]
of the produce that they're making out
[1:23:02]
of there and what they can do. I think
[1:23:04]
this is going to really increase the
[1:23:05]
capacity and, you know, it's not a for
[1:23:07]
profit thing. It's something that
[1:23:08]
they're providing. Go ahead.
[1:23:12]
>> Well, a couple of questions. Well, three
[1:23:15]
questions.
[1:23:16]
Um, one about the green houses. Would
[1:23:20]
what's your estimation of would we be
[1:23:22]
able to go another year if we couldn't
[1:23:24]
replace the green houses with new green
[1:23:26]
houses? So, that's my first question.
[1:23:28]
>> I would want to talk with Pam and Janet
[1:23:31]
about it just because they have put off
[1:23:33]
certain things with updating because of
[1:23:35]
it. Um, you know, the heating systems
[1:23:37]
are antiquated. They have old oil. Um,
[1:23:40]
we're really trying to get away from
[1:23:41]
oil, uh, from everything. you know, they
[1:23:44]
have tanks in the ground.
[1:23:46]
>> Um, and then, you know, some of the
[1:23:47]
glass is broken. That's the issue is a
[1:23:49]
glass greenhouse.
[1:23:50]
>> So, um, I would I would I would if could
[1:23:54]
recommend that we we try to we try to
[1:23:56]
move forward with it just because it is
[1:23:58]
>> there's there's electrical things going
[1:24:00]
on there. I mean, if you were to look at
[1:24:02]
it, it's pretty pretty bad.
[1:24:05]
>> Okay. And then in terms of the um the
[1:24:08]
signage were did we ever um I feel like
[1:24:12]
this in my memory um did we have to have
[1:24:15]
a partnership with the county for some
[1:24:17]
of those weightbearing signs or is that
[1:24:19]
just something I'm imagining
[1:24:23]
» you feel like you know
[1:24:28]
>> so I worked with Steve Feny and another
[1:24:30]
grant which was the veil central park
[1:24:33]
connector
[1:24:33]
>> and that was a signage project that we
[1:24:36]
completed a couple years ago.
[1:24:37]
>> Okay. So, that is what I'm thinking.
[1:24:39]
>> Yeah. And that is in place. Uh and that
[1:24:41]
we utilize the new capital district
[1:24:42]
trail logos. We were one of the first
[1:24:44]
municipalities to do it. Um which is
[1:24:47]
great. And if anybody looks outside the
[1:24:49]
window to see our continuation project
[1:24:51]
that's going on, which is, you know,
[1:24:52]
we're getting some really good reviews
[1:24:53]
of that Franklin Street cycle track. Uh
[1:24:56]
while it's not done, you can really see
[1:24:59]
it because the asphalt's been cut out
[1:25:00]
and the curb going in. And that's the
[1:25:02]
continuation of that path all the way
[1:25:04]
from there. And that's going to be a
[1:25:06]
federal project that we're working on
[1:25:07]
next year as well, which is the
[1:25:09]
continuation of that path from the
[1:25:11]
environmental education center at the
[1:25:13]
state so that someone on a bicycle could
[1:25:15]
have a dedicated path all the way from
[1:25:17]
state fair to city hall. So effectively,
[1:25:21]
you could ride the bike on a dedicated
[1:25:22]
path from State Street to the farm,
[1:25:25]
>> which is great. in our next phase to try
[1:25:27]
to get you from here to Union Street so
[1:25:30]
that we could connect you to the Mohawk
[1:25:32]
uh Mohawk and Trail, which would be
[1:25:35]
huge. So, only only a couple blocks to
[1:25:37]
go until we're done with that.
[1:25:39]
>> Okay. And my last thing was just about
[1:25:41]
um lighting at parks. Um if we I thought
[1:25:45]
for some reason that we had talked about
[1:25:47]
that previously when we had the parks
[1:25:49]
director here, but I'm not seeing it in
[1:25:51]
my notes. that experiment.
[1:25:53]
>> I mean, do we have enough lighting, do
[1:25:55]
you think, in terms of some of the the
[1:25:57]
roadways around the pool
[1:26:03]
» place? I don't know.
[1:26:04]
>> I'm wondering on the road in from um you
[1:26:07]
know, the Rose Garden
[1:26:09]
>> up into like around Music Haven, is
[1:26:11]
there any plan? Are there any plans to
[1:26:13]
>> No, there
[1:26:15]
>> we can. I am. So, as everybody probably
[1:26:17]
knows, the Central Park tennis court
[1:26:19]
project is I'm living right now. When
[1:26:21]
that is completed, um, we are looking to
[1:26:24]
redo Arthur chairs road
[1:26:27]
one way.
[1:26:28]
>> I can look into it. That would be
[1:26:29]
something that would be eligible to be
[1:26:31]
put in lighting on Arthur chairs, but I
[1:26:33]
haven't looked at it as a whole park.
[1:26:38]
>> I It's kind of the first I've heard
[1:26:40]
about it.
[1:26:40]
>> Okay. Thanks.
[1:26:42]
>> Go ahead, please.
[1:26:44]
>> Um, so back to the electric vehicle
[1:26:46]
charging stations. And you talked about
[1:26:48]
you mentioned the couple um in the golf
[1:26:53]
at the golf course.
[1:26:54]
>> Yes.
[1:26:55]
>> Um so as I recall the police department
[1:26:59]
recently got a grant for that, right? So
[1:27:01]
is this in addition to what the money
[1:27:03]
they got? Is the money they got?
[1:27:06]
>> This is in addition. So that those
[1:27:07]
projects are already happening. We have
[1:27:10]
uh Erie Boulevard, the Erie Boulevard,
[1:27:14]
the golf course, Lafayette by the police
[1:27:16]
station, and I believe there's one other
[1:27:18]
location that they're doing right now.
[1:27:21]
>> Foster Avenue.
[1:27:22]
That's correct. Yep.
[1:27:24]
Foster Avenue by the
[1:27:25]
>> So, how many you asking? I mean, is this
[1:27:27]
for here?
[1:27:28]
>> This is four. Let me consult my giant
[1:27:31]
folder.
[1:27:32]
Um I believe it was 10.
[1:27:37]
Uh
[1:27:39]
13.
[1:27:40]
>> 13.
[1:27:41]
>> Yeah, it would this would be good for 13
[1:27:43]
uh dual port charging station.
[1:27:46]
>> So for I can't remember how much how
[1:27:49]
many was it for the police department?
[1:27:51]
Just two or was it four?
[1:27:53]
>> Well, that's different. Remember the
[1:27:55]
police department was getting them under
[1:27:57]
a different uh bond.
[1:27:59]
>> I understand. Okay. That was getting two
[1:28:01]
with two and two with two. So it's four vehicles. That's usually how we do
[1:28:07]
it at the bottom. at the golf course, at
[1:28:10]
the police station, at Foster Avenue,
[1:28:12]
and on Boulevard.
[1:28:13]
>> Right. I just want to make sure at the
[1:28:15]
golf course we're getting four
[1:28:17]
essentially.
[1:28:17]
>> Yes, four.
[1:28:19]
>> Yeah, that was a really actually pretty
[1:28:21]
simple project with those location at
[1:28:22]
the time. So, that's good. And it should
[1:28:24]
be um almost very we just call them.
[1:28:30]
>> And so, are how many are there going to
[1:28:33]
be there now?
[1:28:34]
>> Of course. No. So, so it would be a
[1:28:37]
total of 14 with the 10 is 10 and
[1:28:39]
therefore
[1:28:44]
it's not 10, it's 13.
[1:28:46]
>> Oh, 13.
[1:28:47]
>> 13 plus the four. So, 77.
[1:28:51]
>> Yes.
[1:28:51]
>> And then double that, you have 34 plugs.
[1:28:58]
» Go ahead.
[1:28:59]
>> Thank you. I have a few questions. and
[1:29:01]
everything that you do in your office as
[1:29:03]
far as grants. Are there a lot out
[1:29:06]
there? Is there someone that um
[1:29:07]
particular focuses on grants that might
[1:29:10]
be out there for
[1:29:12]
charging stations? Um that's my first
[1:29:15]
question.
[1:29:16]
>> Um well, I believe some of the money
[1:29:18]
that we got originally was from uh
[1:29:20]
grants
[1:29:22]
with the question mark, so we might do
[1:29:24]
that. Okay. Um
[1:29:28]
next question. As far as the green
[1:29:30]
houses, have have you thought of like
[1:29:32]
the the um freight farm um like uh the
[1:29:36]
city mission has um where they grow
[1:29:39]
things hydroponically
[1:29:41]
as a alternative to something in the
[1:29:43]
greenhouse.
[1:29:45]
>> Have you have you been in there or seen
[1:29:46]
that
[1:29:47]
>> everything grows kind of like
[1:29:48]
hydroponically on walls with lights and
[1:29:51]
things?
[1:29:52]
>> I don't know. Maybe something to look at
[1:29:54]
>> as far as as what he put in there. um
[1:29:57]
and enough I the I had to pass the
[1:30:01]
greenhouse participants not to come just
[1:30:03]
because I said they know let's just have
[1:30:05]
a normal budget meeting but if if there
[1:30:07]
was ever any information they might be
[1:30:10]
listening and coming right now
[1:30:12]
they're very interested in in promoting
[1:30:14]
what they do with the greenhouse so I
[1:30:16]
I'm not familiar with the hydroponic I
[1:30:18]
do know that the new green houses have
[1:30:22]
racks that they do hang things from um
[1:30:24]
compared to the old one but that we've
[1:30:28]
worked on doing some of the capital
[1:30:32]
support the actual plants and other
[1:30:34]
things are run by cooperative extension.
[1:30:40]
» Um the greenhouse volunteers are looking
[1:30:43]
please send us your own recommendation.
[1:30:47]
>> We will look at it
[1:30:48]
>> the new parking kioses. So I mean going
[1:30:52]
with VA and the new system that we're
[1:30:54]
going to go through there's nothing
[1:30:56]
through them that they can give us some
[1:30:57]
money for something to replace some of
[1:30:59]
these in
[1:31:01]
>> we can ask we
[1:31:04]
>> no but a fair point would be is uh I
[1:31:08]
don't know if we have signed any kind of
[1:31:09]
agreement with goat you know Metroplex
[1:31:12]
has gone forward with that I think
[1:31:14]
they've actually started already
[1:31:15]
changing their their branding but right
[1:31:18]
now we have we do not have any type of
[1:31:21]
agreement with them that I'm aware of or
[1:31:23]
transitioning over to that. So, it's
[1:31:24]
something that uh I'll have to follow up
[1:31:26]
on. Um
[1:31:28]
but that could be part of that
[1:31:30]
conversation if they want to contribute
[1:31:32]
anything to this to that point.
[1:31:34]
>> And another thing is the um I know um
[1:31:36]
Central Park is it's considered like a
[1:31:38]
New York State Park. There's a lot of
[1:31:40]
funding that might happen for there for
[1:31:42]
signage.
[1:31:45]
» No, a state park. not a state park but
[1:31:48]
under New York state parks. Um, have we
[1:31:51]
ever looked into anything like that?
[1:31:52]
>> I haven't. I can ask but I think our
[1:31:55]
consultant would have they do a lot of
[1:31:56]
work in state parks and I haven't heard
[1:31:58]
anything about a funding opportunity.
[1:32:00]
>> Okay.
[1:32:00]
>> Um, and the last thing is the lot off of
[1:32:03]
Beer Avenue. Um, there's a lot of
[1:32:06]
construction, grading, milling going on
[1:32:08]
over there. What's what are we going to
[1:32:10]
do there outside of a
[1:32:12]
>> park?
[1:32:13]
>> Right. Is it has it been paved or I
[1:32:15]
haven't been by there in quite a while,
[1:32:16]
but I know we're looking to
[1:32:19]
make a lot of parking there
[1:32:21]
>> and and we have.
[1:32:22]
>> Yeah. Um
[1:32:23]
>> it's open now. There used to be big
[1:32:24]
blocks there.
[1:32:25]
>> There are blocks, but the blocks are to
[1:32:27]
delineate entrance fees. Yes.
[1:32:29]
>> Okay. Oh, good. So just the one and then
[1:32:32]
um so one of the things that I was
[1:32:35]
requested by uh Chris was he asked if we
[1:32:39]
could look at
[1:32:41]
moving the blocks next year and doing a
[1:32:44]
curbed area up front and moved the
[1:32:47]
blocks. The blocks are a temporary
[1:32:49]
measure to try to delineate where it is.
[1:32:51]
and I said that we would work on it um
[1:32:54]
possibly then that what we could do is
[1:32:56]
make um median areas and then put trees
[1:33:00]
in the median areas out front. The
[1:33:02]
reason that trees would be difficult
[1:33:04]
inside of the parking lot itself is that is uh with all development in the
[1:33:09]
city which is a good thing and all the
[1:33:11]
utilization of space that is the city's
[1:33:13]
primary snow dump and when we do pile
[1:33:16]
snow there we use very large
[1:33:19]
and um just the trees would would not
[1:33:22]
farewell given that what we do there but
[1:33:24]
um but so far for everything that we've
[1:33:28]
done we made the area put buildings down
[1:33:30]
we compacted
[1:33:31]
Mike Stron and myself laid out a
[1:33:34]
rudimentary parking lot using just uh
[1:33:37]
paint in hand and um we had one person
[1:33:40]
directing and I I think everything went
[1:33:42]
really well for our events. People just
[1:33:43]
kind of felt once you set the first
[1:33:45]
couple cars up really did work. But I do
[1:33:48]
think that softening the entrance with
[1:33:51]
some plantings and some curb built up.
[1:33:53]
So I'm going to work with Chris on that
[1:33:55]
because right now the blocks
[1:33:58]
Yeah. There is there a little little
[1:34:01]
Thank you.
[1:34:03]
>> Go ahead, please.
[1:34:04]
>> Actually, this has to So, back to the EB
[1:34:07]
starting station. Um, we have a lot
[1:34:09]
around city hall. Um, especially this
[1:34:12]
question is probably more ground for
[1:34:13]
city hall and let me uh what are we
[1:34:17]
doing to make sure that someone with a
[1:34:18]
gas vehicle doesn't park there?
[1:34:23]
>> I think they're all signed to
[1:34:25]
>> Yeah, I understand. But,
[1:34:27]
>> but they would get ticketed just like
[1:34:30]
somebody whose uh year is expired
[1:34:34]
parking someone properly
[1:34:36]
>> unless it's on the weekend and then
[1:34:38]
>> no that would still be ticketed if you
[1:34:40]
have a gas vehicle and an electric
[1:34:42]
vehicle charging station
[1:34:44]
>> but our ticket people don't work on the
[1:34:46]
weekends do they
[1:34:47]
>> police officers do
[1:34:48]
>> oh okay well because I think I um
[1:34:53]
was talking about this with somebody
[1:34:54]
before that it's happening so I didn't
[1:34:56]
know
[1:34:58]
uh what the process when someone sees
[1:35:00]
it, if they should who they should call.
[1:35:04]
>> Um I one of the the things that I have
[1:35:07]
been mentally struggling with and
[1:35:09]
talking with some people in the MO about
[1:35:11]
is um bringing electric vehicle charging
[1:35:14]
stations to the city, not the downtown,
[1:35:17]
the residents.
[1:35:18]
>> Um as you know, not everyone has a
[1:35:20]
driveway or garage.
[1:35:23]
So, if you're trying to promote electric
[1:35:25]
vehicles, but you can't charge an
[1:35:27]
electric, that's one of the things that
[1:35:29]
everybody's trying to talk about is how do you how would you promote people
[1:35:33]
to to use these so you have to put
[1:35:35]
electric charging station places that
[1:35:36]
are more public or in the neighborhoods.
[1:35:38]
So, like I said, we only have we're
[1:35:41]
trying to replace, you know, some, but
[1:35:43]
there's some extra ones in here that I'm
[1:35:45]
looking to try to find some locations
[1:35:46]
that are a bit more neighborhood
[1:35:49]
oriented so that someone may say, "Hey,
[1:35:51]
you know what? I could actually use this
[1:35:52]
if I'm in a neighborhood track because
[1:35:54]
it is it's challenging. You need to have
[1:35:56]
a specific set of circumstances if you
[1:35:58]
want to own one or you charge all the
[1:36:00]
time at a third party which
[1:36:04]
may be feasible but I don't know if I
[1:36:06]
want to purchase a vehicle based off of
[1:36:08]
that.
[1:36:10]
>> Don't is there some way that people can
[1:36:11]
have something at their home
[1:36:14]
>> for the to charge at their own home?
[1:36:16]
>> Yes. to charge that
[1:36:18]
>> you can. But that's what I'm getting at
[1:36:19]
is usually you wouldn't see out on
[1:36:21]
purple.
[1:36:21]
>> No,
[1:36:22]
>> that's what I'm getting at. And a lot of
[1:36:23]
places do not have a driveway or a
[1:36:27]
garage or
[1:36:29]
>> I a lot of people don't know who
[1:36:31]
electric vehicles charge them inside
[1:36:33]
their garage.
[1:36:34]
>> And if we don't have a garage
[1:36:36]
>> or drive makes a little difficult.
[1:36:40]
So maybe maybe that's something to think
[1:36:42]
about again a partnership with possibly
[1:36:44]
the school district because they're
[1:36:46]
located in the neighborhoods and then
[1:36:47]
like especially we're looking at
[1:36:49]
overnight charging then usually
[1:36:51]
overnight you know from 5:00 on those
[1:36:54]
parking lots aren't usually as much in
[1:36:57]
use and I'm sure that especially with
[1:36:59]
the governor's push to our electric
[1:37:01]
vehicles even the school fleet they um
[1:37:04]
like to see it happen like that so maybe
[1:37:06]
that's area start I
[1:37:10]
That's a good idea. There are lots of
[1:37:15]
other
[1:37:18]
» Thank you so much.
[1:37:21]
No.
[1:37:22]
>> So here we can do
[1:37:24]
>> let's do
[1:37:31]
» here
[1:37:40]
85.
[1:37:56]
Thanks.
[1:38:04]
» We should just walk you through the
[1:38:05]
revenue and
[1:38:08]
>> expenditure and then with
[1:38:14]
» Yep. the uh golf fund um 34.34%
[1:38:18]
from 1.69
[1:38:20]
approximately 1.731,000
[1:38:23]
increase
[1:38:25]
um revenues are pretty standard
[1:38:28]
across the board uh will be increased
[1:38:32]
that um
[1:38:35]
and u Mr. The ball will be up in
[1:38:40]
January. Uh that's per usual year. Other
[1:38:44]
than that status fun,
[1:38:50]
you just want to walk us through
[1:38:51]
anything, highlight anything that we
[1:38:52]
need to know, what's going on with the
[1:38:54]
golf course?
[1:38:57]
Um specifically, anything just general?
[1:39:03]
Again, I mean, as Jer mentioned, really
[1:39:05]
nothing much in the
[1:39:08]
adapted revenues really. It's pretty
[1:39:10]
much the same. Um, we have seen just
[1:39:15]
I mean, the last two years have been
[1:39:16]
incredible weather with the obviously
[1:39:19]
was a kind of a hiccup to start the
[1:39:21]
year. The spring really uh rainy, so we
[1:39:26]
were kind of behind uh last year's
[1:39:28]
revenues for most of the year. We
[1:39:29]
managed to catch up um at the beginning
[1:39:33]
of this month and I think we're going to
[1:39:34]
start being able to pull away from last
[1:39:36]
year's numbers now as a result of that.
[1:39:38]
But it took us a while to get there when
[1:39:39]
we finally did get past that hurdle. Um
[1:39:43]
I would probably say since mid June
[1:39:45]
right through to now I mean the
[1:39:48]
weather's been incredible and it showed
[1:39:51]
um just the amount of people that we've
[1:39:53]
been able to bring through there. I
[1:39:55]
think golf courses in general rest the
[1:39:57]
capital region have really um seen a lot
[1:40:00]
of success this year. Well, the last two
[1:40:02]
years really but uh it was a nice
[1:40:04]
turnaround because it was it it didn't
[1:40:08]
look it was kind of bleak in the
[1:40:09]
beginning of the year. Sure.
[1:40:14]
» Yes.
[1:40:15]
So you staffing your your um your
[1:40:20]
staffing is showing an increase of food
[1:40:23]
position into the 2026 budget. You want
[1:40:25]
to highlight the reason?
[1:40:27]
>> Yeah, it's just because we're we become
[1:40:30]
so busy and we like to just fill a
[1:40:32]
couple of areas. Um
[1:40:35]
and of course I don't like to have
[1:40:36]
burnout with some staff members. So it's
[1:40:39]
nice to have some extra people on hand
[1:40:42]
to fill certain roles.
[1:40:45]
um when we are busier for sure.
[1:40:49]
In terms of the number of attendants,
[1:40:51]
the fee increase we've had, you know,
[1:40:54]
minor fee increase over the last couple
[1:40:55]
years,
[1:40:57]
>> does that affecting the the numbers, the
[1:41:01]
attendance at the golf course in terms
[1:41:04]
of the fees in terms of numbers? Are we
[1:41:06]
seeing a trend upward trend in terms of
[1:41:08]
attendance?
[1:41:11]
Um, I think it's just pretty much
[1:41:12]
plateaued. You can only put in so many
[1:41:15]
rounds a day and I think we we're just
[1:41:19]
seeing that number almost maximum every
[1:41:21]
year.
[1:41:22]
>> I don't I don't really see a decrease
[1:41:24]
because of the fees going up at all.
[1:41:28]
>> The weather was a dampening factor in
[1:41:31]
spring tendency was down. But the
[1:41:33]
problem now is max out of tea times. If
[1:41:37]
people don't have the ability to
[1:41:39]
collect, there sign up, get in there.
[1:41:42]
There's still slots on Sunday afternoon
[1:41:45]
that are open that tend to be slow and
[1:41:48]
maybe a little bit later on Saturday,
[1:41:51]
but otherwise you wait in line to play
[1:41:54]
golf. It's a great facility and it's in
[1:41:58]
tiptop shape.
[1:41:59]
>> So, how how is a new improvement working
[1:42:02]
out the RP location that you made to
[1:42:06]
>> Oh my god. Do you want to talk about
[1:42:07]
that? Highlight that.
[1:42:10]
So, yeah, the new irrigation system
[1:42:12]
install has been I mean didn't come out
[1:42:15]
on high, right, Chris? We had some minor
[1:42:17]
bumps on the road with the install. Some
[1:42:20]
of the heads were sticking, a little bit
[1:42:21]
issue with the pump station, but once
[1:42:23]
those resolved, I mean,
[1:42:26]
>> I've been at that golf course for this
[1:42:27]
is my 14th year as head professional.
[1:42:30]
Um, even as a kid growing up,
[1:42:34]
it's pretty remarkable. I have never
[1:42:37]
seen a golf course look in the condition
[1:42:38]
that it is right now. I was at the Ryder
[1:42:40]
Cup at Beth Paige a few weeks ago
[1:42:44]
>> and you look at the shape of the holes
[1:42:46]
and you know you can tell when a golf
[1:42:47]
course has a high punch. You just just
[1:42:50]
by the way it's manicured. It's just as
[1:42:52]
simple as that.
[1:42:54]
>> You look down the first fairway of our
[1:42:56]
golf course and I'm like man it's not
[1:42:58]
that much different. I mean, just the
[1:43:00]
definition of it,
[1:43:03]
just the the plane condition, but that's
[1:43:05]
the one area that I hear mostly from
[1:43:09]
golfers all over the Capitol region that
[1:43:11]
come here. They're like, "This place."
[1:43:14]
>> I mean, I think the biggest complaint
[1:43:17]
now is the rough is too hard. The grass
[1:43:19]
is too long in the rough. But see, the
[1:43:21]
issue is that the rough never got the
[1:43:24]
watering system to hit those areas. Now,
[1:43:26]
it is. It's healthy. So now they're
[1:43:29]
discovering it's it's a little more
[1:43:31]
difficult in in that respect, but it's
[1:43:33]
not because the grass is longer, it's
[1:43:36]
healthier.
[1:43:37]
>> And that's the one and actually they've
[1:43:39]
cut the grass a little bit shorter in
[1:43:40]
that regard, but because it's thick and
[1:43:42]
healthy. So I mean, you see it in in
[1:43:44]
neighborhoods when when a person really
[1:43:47]
takes care of their lawn and so they're
[1:43:48]
well manicured. You go on there, you see
[1:43:50]
how healthy the grass is. That's what
[1:43:52]
it's like at our facility. Every square
[1:43:54]
inch of it.
[1:43:57]
How how is the new vendor the concession
[1:43:59]
side working on? Fantastic. Mr. Nick's
[1:44:02]
been great. He's um I mean that that's
[1:44:05]
another area. He's completely
[1:44:06]
transformed. If anybody's been in there,
[1:44:09]
you see it's it's u it's a complete 180
[1:44:12]
from what it's been. I mean, I June and
[1:44:14]
Dave did a very nice job for what they
[1:44:16]
had, but he's brought it to a different
[1:44:19]
level. It's much more professional. Um
[1:44:22]
just the look of the the facility in
[1:44:24]
general. It's more accommodating. And
[1:44:26]
he's getting people that aren't there to
[1:44:28]
play golf. They're just coming there to frequent the place.
[1:44:32]
>> It's Yeah. Yeah. We actually did a
[1:44:34]
wedding there.
[1:44:36]
>> That was a first.
[1:44:38]
>> Yeah. There's an event tent down. Yeah.
[1:44:41]
There's an event tent down between the
[1:44:42]
9th and 18th green just beside one of
[1:44:45]
the practice screens. And you can see it
[1:44:46]
coming up 18 and 9. It kind of sits in
[1:44:48]
the background. And he uses that for
[1:44:51]
special events. So it's more
[1:44:52]
accommodating for other things. Um and
[1:44:55]
he's util utilizing every inch of that
[1:44:57]
space. So he's done a tremendous job
[1:45:00]
>> talking about that. A couple years ago
[1:45:02]
we had um body typically.
[1:45:06]
That's it. So is that that's going to be
[1:45:08]
up on his office and it's available for
[1:45:10]
people to rent for special event.
[1:45:12]
>> Yes.
[1:45:13]
>> It's been up.
[1:45:14]
>> Yes. I believe he has been.
[1:45:16]
>> He has.
[1:45:17]
>> Yeah.
[1:45:21]
» Miss
[1:45:24]
questions uh under revenue CR2012
[1:45:29]
utility reimbur. So it was like 12
[1:45:33]
>> 12,23 and 50,000 down from 25 back up.
[1:45:38]
Can you tell us what that's for?
[1:45:39]
>> Utility reimbursement. Chris.
[1:45:41]
>> Yeah. Eric
[1:45:44]
utility reimbursement. you're handling
[1:45:45]
the reimbursement end of it. I mean,
[1:45:46]
he's really reimbursing the meter
[1:45:48]
values. So, even that that number there
[1:45:51]
is kind of it's a pass through more or
[1:45:52]
less, right?
[1:45:54]
>> Right. So, but we're not
[1:45:59]
>> that number is actually probably but one
[1:46:02]
of the things is that really isn't a
[1:46:03]
revenue because there isn't an expense
[1:46:06]
to offset it. So, that's something maybe
[1:46:08]
we have to look at. He is the the
[1:46:11]
building is great. The building is
[1:46:12]
metered to two meters. One meter is our
[1:46:15]
meter, one meter is his meter.
[1:46:17]
>> The city as the owner of the building
[1:46:19]
receives the bill and we issue me to him
[1:46:22]
every month for that amount. Um, and I
[1:46:24]
believe that he would, but I don't know
[1:46:26]
if it actually gets reported at revenue.
[1:46:28]
I don't know if it does.
[1:46:29]
>> It does.
[1:46:30]
So, right now we up to
[1:46:33]
>> I don't know,
[1:46:35]
but
[1:46:37]
>> but it's it's a net it's a net zero. The
[1:46:39]
city does not make money. The city does
[1:46:41]
not lose money. is paying for a meter
[1:46:43]
from pitch,
[1:46:44]
>> right? So, it's really So, based on that
[1:46:46]
explanation, it's really not revenue,
[1:46:47]
just getting reimbursed because
[1:46:52]
» Oh, I'm sorry. In part two, um
[1:46:56]
the seasonal memberships
[1:46:58]
>> went down significantly.
[1:47:00]
>> Yeah,
[1:47:00]
>> that's on that's on purpose.
[1:47:04]
>> Yeah. So we we we raised it we raised it
[1:47:06]
what three or four years ago to a
[1:47:09]
different number significantly higher
[1:47:11]
than they were which we felt that they
[1:47:12]
were undervalued.
[1:47:14]
>> Um and we are municipal courts after
[1:47:17]
all. We didn't want to turn it into a
[1:47:18]
more of a private club style place or
[1:47:21]
just membership type style.
[1:47:23]
>> Um so I think there was a lot of players
[1:47:26]
that were turned off by that. They
[1:47:28]
didn't they decided not to get the
[1:47:29]
season membership or season pass rather.
[1:47:32]
And I've noticed it's cyclical. There'll
[1:47:35]
be there'll be years where we'll get
[1:47:37]
people that are interested and they're
[1:47:38]
all gung-hong and say, "Yeah, I want to
[1:47:40]
get it." And the number goes up, then it
[1:47:41]
comes and flows. Um,
[1:47:45]
I personally like it when that number's
[1:47:47]
lower because we're able to get it more
[1:47:48]
agree. I think we do better revenue wise
[1:47:50]
when the season memberships are lower.
[1:47:53]
And my So, one of the things I just
[1:47:56]
wanted to point out with Matt, I think
[1:47:57]
you detailed it. One of the things that
[1:48:00]
Matt has to has to handle which is a big
[1:48:04]
task and what we work together on is t
[1:48:08]
times the final. So you know I can
[1:48:11]
honestly right now tell you the maximum
[1:48:14]
amount of revenue the course could make.
[1:48:16]
It's just an equation. It's the amount
[1:48:18]
of tea times times the amount of days
[1:48:20]
that were open times a non-resident rate
[1:48:23]
for the car. And I could show you that
[1:48:24]
number and I this is the maximum this
[1:48:26]
portion is ever going to make. But what
[1:48:29]
Matt really is managing which is
[1:48:31]
difficult is you have events, you have
[1:48:34]
leagues, you have the public and you
[1:48:36]
have season passholders. You have those
[1:48:38]
four categories and I might be missing
[1:48:40]
one. Correct me if I'm wrong. And we
[1:48:42]
have to manage how we have those four
[1:48:44]
categories into this finite block of
[1:48:47]
times. If Matt wanted to, he could book
[1:48:51]
an event almost every single day,
[1:48:54]
but then the public won't be able to
[1:48:56]
play the golf course. Similarly, a
[1:48:58]
league. He has a waiting list, I
[1:48:59]
believe, for leagues. We could have
[1:49:01]
leagues go from 9:00 am to 5:00 pm. Once
[1:49:03]
again, then the public cannot play the
[1:49:05]
golf course.
[1:49:05]
>> So, it's a balance of when do we
[1:49:07]
actually allow leagues to come and if a
[1:49:09]
league goes, there's a back when we want
[1:49:11]
to some public events. We stopped having
[1:49:13]
events on certain days.
[1:49:14]
>> Yeah. We haven't we've decided not to
[1:49:17]
take events on weekends just because
[1:49:19]
that's a peak time for us uh the most
[1:49:22]
popular time for the general public to
[1:49:24]
be able to play the golf course. But as
[1:49:25]
Chris described, those four entities,
[1:49:27]
they all have important value to the
[1:49:30]
course. It's important to have events
[1:49:31]
there
[1:49:32]
>> so you can showcase the golf course.
[1:49:34]
It's important to have play. And of
[1:49:36]
course, it's extremely important to have
[1:49:38]
regular. Um, and all four serve a
[1:49:41]
purpose for that facility.
[1:49:44]
But trying to balance them all is the
[1:49:46]
tricky part.
[1:49:51]
» That was my question.
[1:49:54]
membership was down 40%. But I know
[1:49:56]
there's a huge hike in increase and um
[1:50:00]
so that works out well especially
[1:50:02]
balancing everything out
[1:50:04]
>> and golfing there.
[1:50:06]
>> Yeah.
[1:50:07]
>> Two times a week. The course is just
[1:50:09]
beautiful. And on those hot days when
[1:50:11]
the sprinklers go off, it's nice to run
[1:50:13]
underneath them.
[1:50:15]
And we do complain about now the burst
[1:50:19]
of the rough being way too rough to get
[1:50:22]
out of, but it's because the grass is so
[1:50:24]
healthy and hopefully we can set it up a
[1:50:27]
little bit instead of playing the ball
[1:50:28]
where it lies
[1:50:30]
>> like
[1:50:32]
that.
[1:50:34]
>> But it is it's Thank you for everything
[1:50:36]
that you do there. Mr. Mati has been a
[1:50:39]
nice addition to your team up there.
[1:50:41]
Yeah, just agree.
[1:50:43]
>> And of course the parlor.
[1:50:46]
>> Yeah,
[1:50:46]
>> it's been good. I mean, there's a lot of
[1:50:48]
times there's we're coming in from
[1:50:50]
league play and there's not any room for
[1:50:52]
us to kind of sit or hang out because so
[1:50:54]
many people are there from different
[1:50:56]
organizations. One being the whole um
[1:50:59]
lacrosse team from this game was
[1:51:01]
>> Yeah. The beginning of the year, right?
[1:51:02]
>> Yeah. So, it was um you know, but they
[1:51:04]
we you know, we whatever. So, it's it's
[1:51:08]
a good thing. Everything moving forward
[1:51:09]
there is perfect. Thank you.
[1:51:13]
>> Go ahead.
[1:51:16]
>> Okay. So, so, so the golf course is
[1:51:18]
making money for the city.
[1:51:20]
>> What's that?
[1:51:20]
>> I said so the golf course is making
[1:51:21]
money for the city and when um so we're
[1:51:24]
not like taking any money out of the
[1:51:26]
general fund to support the golf
[1:51:27]
courses. It's quite the opposite.
[1:51:29]
>> Correct.
[1:51:30]
>> Right. So if so kind of to Mr. point.
[1:51:34]
It's
[1:51:35]
if you kind of managed it just a little
[1:51:39]
differently um to maybe allow some more
[1:51:42]
of the and it might cut down the
[1:51:44]
availability of the public, you know,
[1:51:46]
being a municipal golf course, I need I
[1:51:47]
have to balance those tensions. I'm just
[1:51:50]
thinking like how much would you have to
[1:51:52]
change or is it that formula? is it's so
[1:51:55]
specific that you could say, "Oh, if we
[1:51:57]
um opened it up to a league or two more
[1:52:00]
leagues this many times a year, it would
[1:52:03]
generate this amount of uh revenue." Um
[1:52:07]
I'm thinking um u quite um selfishly
[1:52:12]
about like how could we manage that and
[1:52:14]
maybe produce some revenue for our
[1:52:17]
existing youth employment line that that
[1:52:20]
I'm just kind of bouncing that idea out
[1:52:22]
there. Actually, my question is very
[1:52:24]
much related to
[1:52:28]
Max has really done a great job of
[1:52:30]
balancing the whole thing. And the one
[1:52:31]
factor right now to drive revenue what
[1:52:34]
is slightly beyond our control. It's the
[1:52:37]
weather.
[1:52:38]
>> You get a nice day. People are there
[1:52:40]
playing golf.
[1:52:41]
>> It's pouring rain. It drops the revenue
[1:52:44]
pretty much to what is it? Zero.
[1:52:47]
>> Yeah.
[1:52:49]
But you know, you look at that balance
[1:52:53]
and I understand what you're saying, but
[1:52:56]
>> there's not a simple thing. If you give
[1:52:58]
one lead, you're going to get x number
[1:53:00]
of dollars because you're going to lose
[1:53:02]
some free play uh from the uh general
[1:53:05]
public, but it's just if you've got good
[1:53:08]
weather,
[1:53:10]
>> they get more people.
[1:53:12]
So, I guess to kind of because I think
[1:53:14]
we're all on the same page here. So,
[1:53:16]
like maybe looking at um I mean I would
[1:53:21]
love to see it go to 300,000. That's I
[1:53:24]
don't know. But if if maybe to
[1:53:27]
increase the membership fees slightly
[1:53:29]
across all the fees to generate
[1:53:32]
$150,000,
[1:53:34]
>> I don't know how much that would, you
[1:53:36]
know, how much that would increase it
[1:53:38]
for an individual
[1:53:40]
member. Just trying to figure out how do
[1:53:42]
we do that.
[1:53:43]
>> So yeah, so the season passes when you
[1:53:45]
most of them will look at it in terms of
[1:53:48]
so let's say a non-resident
[1:53:51]
is I think it's $2,100 off the top of my
[1:53:54]
head.
[1:53:54]
>> Sure.
[1:53:55]
>> They're going to dissect that number
[1:53:59]
every which way they can think of.
[1:54:00]
>> Sure.
[1:54:01]
>> How many rounds do I need to play to
[1:54:02]
make sure that I can get my value? And
[1:54:05]
then there's going to be a few that say
[1:54:06]
they don't care. It's the convenience of
[1:54:08]
it. I can book eight days in advance as
[1:54:10]
opposed to seventh. It's convenient for
[1:54:12]
me. I like that. So, I'm going to do it.
[1:54:14]
So, it depends on the person's, I guess,
[1:54:17]
interest in that regard. Um, but yeah, I
[1:54:20]
mean, you could you could raise it to
[1:54:21]
any number you want, but what are they
[1:54:24]
getting for the value, but it's not a
[1:54:27]
typical golf course. I was saying they
[1:54:28]
got this pool, locker room, tennis
[1:54:31]
facilities. We have a lot of those
[1:54:33]
things already, but they're just in
[1:54:34]
separate entities. We have a public, we
[1:54:37]
have the tennis courts, pickle ball, and
[1:54:39]
all that, but they're located throughout
[1:54:40]
the city. It's not in one specific
[1:54:44]
facility. Like at Mohawk Club, for
[1:54:45]
instance, you go there, they have a
[1:54:47]
pool, they have locker room, they have
[1:54:48]
clubhouse. Um, everything is right
[1:54:50]
there, centrally located. It's very
[1:54:52]
convenient.
[1:54:53]
>> But their membership are their
[1:54:55]
membership fees are $10,000 for a family
[1:54:57]
of four.
[1:54:58]
>> Right. So, there's a lot of daylight in
[1:55:00]
between that and talking about how
[1:55:01]
amazing to your point and everyone's
[1:55:03]
point, how amazing our golf course is.
[1:55:05]
That looks I'm just imagining that there
[1:55:07]
might be some um some opportunities
[1:55:09]
there to to to increase revenue
[1:55:12]
especially for um that line of
[1:55:14]
particular
[1:55:15]
>> were to do something like that then I
[1:55:18]
would ask that you you own it
[1:55:21]
>> which is
[1:55:21]
>> say again
[1:55:22]
>> like but years ago right we got a 75th
[1:55:25]
anniversary fee
[1:55:26]
>> and you knew what it was we were
[1:55:29]
charging a dollar extra around for the
[1:55:31]
75th anniversary fee went into a pot and
[1:55:34]
that was used. We bought benches and we
[1:55:36]
did some improvements off the 75th
[1:55:37]
anniversary fee. So if you are looking
[1:55:40]
for the golf course to fund a parks
[1:55:43]
youth a program, then I would say you don't hide the fee. You don't you
[1:55:49]
know you put it out there and you put a
[1:55:51]
poster on the golf course and you say
[1:55:53]
that like the city of Skenctity fees are
[1:55:56]
helping fund X. So maybe, you know,
[1:55:58]
you're going to get the cranky old
[1:56:00]
people that have been there for 50 years
[1:56:01]
that'll say, "I can't believe the fees
[1:56:02]
went up to $2 instead of one." But, you
[1:56:05]
know, you're giving us to say this is
[1:56:07]
what we're doing with it. This is the
[1:56:08]
part between that. The only thing that I
[1:56:10]
want to make sure is, you know, once
[1:56:12]
again, if we're trying to operate this
[1:56:14]
golf course fiscally responsible, is
[1:56:16]
that if you were to look on page um 90
[1:56:23]
and this is, you know, typically how we
[1:56:25]
go see it is that you're going to see
[1:56:27]
transfer to general fund, audit fund,
[1:56:30]
super fund 250, and 2,000. And then
[1:56:34]
underneath you're going to see a
[1:56:35]
transfer to capital fund, which is
[1:56:37]
blank.
[1:56:38]
The reason that that's usually blank is
[1:56:40]
that we don't anticipate ever, you know,
[1:56:43]
a revenue, right? We we make sure our
[1:56:46]
expenses equal our our revenues. And
[1:56:49]
then what to Matt's point, right? Right
[1:56:51]
now, all things considered, we're moving
[1:56:54]
into the black, right? We we're slowly
[1:56:57]
creeping into the black. As we creep
[1:56:59]
into the black and hopefully our
[1:57:00]
revenues pace our expenses, then that
[1:57:03]
transfer to the g capital fund goes up.
[1:57:05]
Tick tick tick tick tick tick. And
[1:57:07]
that's what we use for our capital,
[1:57:09]
which you're going to ask about lately.
[1:57:11]
Next, if we start taking the capital
[1:57:16]
fund revenue, then we're not going to be
[1:57:18]
putting any money into our savings, and
[1:57:20]
then we're going to be reonding on
[1:57:22]
bonding to buy our mowers and equipment.
[1:57:25]
So, it would need to be, you know, the
[1:57:28]
transfer of the general fund would need
[1:57:30]
to be equal. And then we still need to
[1:57:31]
be able to make sure that we have a
[1:57:33]
capital fund, you know, and and that's
[1:57:34]
to the mayor's point, but even if it
[1:57:36]
rains, you know, we can't anticipate
[1:57:37]
every day being sunny that we have to
[1:57:39]
because if we bring our transfer of the
[1:57:41]
capital fund to zeros, our savings will
[1:57:44]
go down very quickly and then we're
[1:57:47]
going to rely on bonding, which we
[1:57:49]
haven't had to do before.
[1:57:50]
>> Right. So I guess my the I agree my
[1:57:53]
point is saying like even even with that
[1:57:55]
consideration made then what we're
[1:57:57]
essentially saying is that and and I
[1:57:59]
agree with you like you know just be
[1:58:01]
really clear and transparent about why
[1:58:03]
we're doing it. I think that I think
[1:58:04]
that would actually encourage people to
[1:58:07]
um feel a little bit better about you
[1:58:10]
know about paying an increased fee
[1:58:11]
because they recognize that you know
[1:58:13]
it's you know going to to something
[1:58:15]
that's also it's being reinvested in the
[1:58:18]
community right and that then we get the
[1:58:20]
economic benefit of that dollar and that
[1:58:22]
so on so forth with the public safety
[1:58:23]
yada yada stuff I've been saying for
[1:58:25]
years but so I say yes um do that and
[1:58:28]
I'm and and the I guess the formula I
[1:58:29]
would say is that I'm sure you guys are
[1:58:30]
going to come and say you know we put a
[1:58:32]
lot of money into this golf course and
[1:58:34]
it's absolutely beautiful, one of the
[1:58:36]
best around for what it is. Um, so we're
[1:58:39]
going to, you know, we just we justify
[1:58:41]
increasing the fees and still leaving a
[1:58:44]
lot of daylight between us and the p
[1:58:46]
private golf course, right? So, my
[1:58:48]
saying is like maybe we if you could
[1:58:50]
figure out what that formula would be,
[1:58:51]
what is it what does it look like to um
[1:58:55]
increase fees to where we're able to put
[1:58:58]
the money away, but there is that
[1:59:00]
additional and intentional couple bucks
[1:59:03]
spread across everyone that could equal
[1:59:05]
to this $200,000 and then we can fund a
[1:59:07]
youth program which puts money back into
[1:59:10]
the community and saves us money in the
[1:59:12]
public safety uh alliance. as well. So,
[1:59:15]
like that's what I'm suggesting we do.
[1:59:18]
>> Yeah. What's the amount?
[1:59:20]
>> Well, my amount my amount would be
[1:59:22]
$300,000. So, once we get there, I mean,
[1:59:24]
believe once we get there, we could talk
[1:59:26]
about, you know, scaling it back, but
[1:59:27]
like let's look let's look at what it
[1:59:29]
would be is what I'm saying we should
[1:59:31]
do.
[1:59:32]
>> Go ahead.
[1:59:35]
Okay.
[1:59:36]
>> Well, in a related issue, um, of course,
[1:59:39]
because I'm not a golfer, I can't
[1:59:41]
remember what the golf starter ranger
[1:59:43]
is, but I was wondering if those could
[1:59:45]
be youth, and I think they probably
[1:59:47]
already are, but
[1:59:49]
>> they be youth employees,
[1:59:51]
>> because I was kind of thinking that that
[1:59:53]
would be 10 of the um, you know, that
[1:59:57]
would be 10 employees um, right there.
[1:59:59]
That's $45,000. Um, but I think Are
[2:00:02]
they? Um, I'm not sure. So
[2:00:05]
>> couple not really specifically for those
[2:00:08]
types of positions.
[2:00:09]
>> Okay.
[2:00:09]
>> Um Peter's younger heart.
[2:00:12]
>> Yeah.
[2:00:14]
>> So when you're a starter at the golf
[2:00:16]
course, right? Um
[2:00:18]
>> it's it's it can be a pressure packed
[2:00:21]
situation for sure. I mean you're
[2:00:23]
constantly working to get golfers out at
[2:00:26]
a reasonable time and a lot of times the
[2:00:28]
starters get bullied by the golfers.
[2:00:31]
They are impatient.
[2:00:33]
uh they don't want to play with certain
[2:00:34]
people. If they get paired up with
[2:00:36]
strangers they may not know and that's
[2:00:39]
kind of part of it being on a public
[2:00:40]
golf course that's sort of what goes
[2:00:43]
along with that uh facility.
[2:00:46]
>> Okay.
[2:00:47]
>> So it's you know if you have a young
[2:00:51]
individual of 16 years old may not be
[2:00:53]
able to handle that sort of pressure or
[2:00:54]
know how to talk to an individual
[2:00:56]
because they don't have the maturity yet
[2:00:58]
for that. Not saying that that's going
[2:01:00]
to happen but it's a possibility. Um, so
[2:01:03]
we try not to put them in a position
[2:01:05]
that they're not going to succeed in.
[2:01:07]
>> Oh, yeah. No, the same at the pool.
[2:01:08]
>> We may be able we'll kind of groom them
[2:01:11]
to get them,
[2:01:12]
>> right?
[2:01:12]
>> Like get them under the flanking of, you
[2:01:15]
know, a senior staff member to say,
[2:01:18]
"Here, take them under your wing for a
[2:01:19]
day or two, see how they do."
[2:01:21]
>> And that's happened. So, um,
[2:01:25]
one of the best employees I ever had was
[2:01:26]
Ric Carlo Greley. The kid was amazing.
[2:01:28]
He was mature beyond his years and he
[2:01:30]
could do everything,
[2:01:32]
>> right?
[2:01:32]
>> But he worked his way to that. We didn't
[2:01:34]
just thrust him in there. He he actually
[2:01:36]
took it upon himself and volunteered to
[2:01:38]
do these different positions and we felt
[2:01:40]
that he was successful. But that of
[2:01:42]
course that's not you're not going to
[2:01:43]
always get an individual like that.
[2:01:46]
>> So that's what we tried to do. If that
[2:01:47]
answers your question
[2:01:48]
>> that did um I think we're you know we're
[2:01:50]
all kind of interested in how we're
[2:01:52]
going to be able to um you know fund
[2:01:53]
that $150,000.
[2:01:55]
>> We just found it. Um but um I so also
[2:01:59]
along those lines, the raffle um I can't
[2:02:02]
remember how much the check was that
[2:02:03]
went to APF this year when you guys uh
[2:02:06]
came to the
[2:02:08]
about $1,200.
[2:02:10]
>> Yeah. So that wasn't much. Okay.
[2:02:12]
>> Because I was going to suggest that too
[2:02:13]
could also be part of um you know the
[2:02:16]
instead of giving it to an outside
[2:02:17]
nonprofit that we actually give it to a
[2:02:20]
youth employment fund or youth services
[2:02:22]
fund within the city. But it's only
[2:02:23]
1,200 bucks. So,
[2:02:25]
>> we can certainly discuss a rate increase
[2:02:27]
this year, of course, you know, fits it.
[2:02:30]
Um,
[2:02:31]
you know, one of the things, of course,
[2:02:33]
with this little handout that I showed
[2:02:35]
you was that there was a study done
[2:02:36]
across New York State called an economic
[2:02:38]
environmental impact study and we
[2:02:41]
participated in our at least our
[2:02:42]
facility started participating back in
[2:02:44]
January. But I brought our maintenance
[2:02:46]
staff in and we answered all the
[2:02:47]
questions and pro you know provided all
[2:02:50]
the numbers they were looking for and it
[2:02:53]
was it was enjoyable because at the
[2:02:55]
writer uh at the PGA tent um the person
[2:02:59]
who was responsible for putting all this
[2:03:01]
data together was there and unveiled it
[2:03:03]
all to us. So, it was it was kind of a
[2:03:04]
neat experience cuz there was PJ
[2:03:06]
professionals from all across the
[2:03:08]
country there. And this was highlighting
[2:03:10]
New York specifically saying that we're
[2:03:12]
like the leaders and uh golf, one of the
[2:03:15]
top states in golf for jobs, economic
[2:03:18]
impact, etc.
[2:03:20]
And it was really neat because that page
[2:03:23]
state work was held. A writer Cup has
[2:03:25]
never been held at a stateowned golf
[2:03:27]
course before. That was the first time
[2:03:28]
that ever happened. Wow.
[2:03:30]
>> And it's owned by the state of New York.
[2:03:31]
It's a municipality
[2:03:33]
and 25% of the facilities that are
[2:03:36]
involved in this are municipality golf
[2:03:39]
courses.
[2:03:40]
>> So they provide a considerable amount of
[2:03:42]
revenue and a big portion of this is
[2:03:45]
provided by municipal. So
[2:03:48]
>> one of the things that municipals do is
[2:03:51]
they provide accessible affordable golf.
[2:03:54]
So you got to tread that fine line
[2:03:56]
because we are municipal. We don't want
[2:03:57]
to raise the rates too high because
[2:03:59]
that's what we pro pride ourselves in.
[2:04:02]
But at the same time, listen, our
[2:04:03]
expenses are not going to get any lower.
[2:04:05]
We already know that everything's
[2:04:07]
getting more expensive.
[2:04:09]
Uh the cost of doing things and cost of
[2:04:11]
doing business is more expensive. So,
[2:04:12]
you have to you can't they're just
[2:04:15]
everything's going up. I hate to say it,
[2:04:17]
but that's just the way it's going to
[2:04:18]
be.
[2:04:19]
>> Yeah.
[2:04:19]
>> And so, we've got to I like the way Mr.
[2:04:23]
Farley's thinking. Maybe we should raise
[2:04:25]
our rates so we're not working so hard
[2:04:27]
to keep our heads just above water.
[2:04:30]
>> Yeah. And I mean I think I'm sorry.
[2:04:32]
>> No.
[2:04:33]
>> Okay. I I was thinking, you know, we
[2:04:35]
made quite the investment in the golf
[2:04:37]
course, you know, with our funds as
[2:04:38]
well. And I think that this is like a
[2:04:40]
>> one of those ways which I think was a
[2:04:42]
wise. So this is one of those ways to
[2:04:44]
get,
[2:04:45]
>> you know, with every a lot of people do
[2:04:47]
a little and then we can kind of, you
[2:04:49]
know, we can
[2:04:50]
>> get that that line funded. Well, it's
[2:04:53]
interesting because I think we've been a
[2:04:55]
lot of a big uh leader in the community
[2:04:57]
as far as that goes. So, when we first
[2:04:59]
did the GPS on our golf carts, all of a
[2:05:03]
sudden four or five other public golf
[2:05:05]
courses in the area,
[2:05:07]
>> what do they do? They got GPS in their
[2:05:08]
golf course because they see how
[2:05:10]
successful we were. We did irrigation.
[2:05:12]
Town of Colony just put a like a $16
[2:05:14]
million renovation project into their
[2:05:16]
golf course. I don't know where they got
[2:05:18]
money for that,
[2:05:20]
but they have two 18hole golf course.
[2:05:24]
That's a huge property, but they're redoing the entire uh facility
[2:05:29]
over it. And I think the same irrigation
[2:05:31]
company is doing their facility that did
[2:05:34]
ours. But um anyway, Frier Park and
[2:05:37]
Troy, same thing. New irrigation, big
[2:05:39]
renovation project. All municipal golf
[2:05:41]
coursees. Um Amsterdam Municipal just
[2:05:44]
rebuilt the brand new clubhouse. I mean,
[2:05:46]
so they're all doing renovations to
[2:05:48]
their facilities in some regard, but um
[2:05:51]
it almost seems like we're like at the
[2:05:53]
forefront. Like what is Skenkity doing?
[2:05:55]
What are they doing that they're able to
[2:05:56]
finish in the black all the time?
[2:05:58]
>> And Chris and I pride ourselves in not
[2:06:01]
being a burden on the city. We never
[2:06:03]
want to be a burden to the city. We self
[2:06:04]
sustain a lot of our projects and don't
[2:06:07]
ask for funding. I mean, I think the
[2:06:10]
history of being here shows that.
[2:06:13]
Wouldn't you say, Chris?
[2:06:14]
>> Sure.
[2:06:16]
So, I hope that answers some of your
[2:06:18]
questions. But if you get a chance to
[2:06:19]
look at this in the bottom right corner,
[2:06:21]
it's kind of small, but it says New York
[2:06:23]
Golf impact.org.
[2:06:25]
And the study, well,
[2:06:28]
it's pretty impressive the numbers they
[2:06:29]
came up with. It shows everything from
[2:06:31]
economic and and uh environmental
[2:06:34]
impacts and what golf courses are doing
[2:06:36]
all across the state from Buffalo to
[2:06:38]
Malone down to Long Island. um water
[2:06:42]
conservation,
[2:06:43]
um animal protection stuff.
[2:06:46]
>> We're a part of the Autobon Society,
[2:06:48]
which is important.
[2:06:49]
>> We've been with them for a long time.
[2:06:51]
>> But things like that.
[2:06:54]
>> Yeah,
[2:06:55]
>> let's do it, man.
[2:06:57]
>> I just had a question. Yeah, you
[2:06:59]
mentioned self sustaining. So, how does
[2:07:01]
that how does the capital funding factor
[2:07:05]
into the entertainment? Is that hard
[2:07:07]
compartment or capital is outside?
[2:07:10]
of your expenditure here
[2:07:13]
>> in which and
[2:07:14]
>> capital. Yes.
[2:07:16]
>> Yes. Operating.
[2:07:17]
>> So how how is that factoring into your
[2:07:19]
overall expenditure? Are you recovering
[2:07:21]
this class? Are you funding this class?
[2:07:23]
Because this is not funded. This is
[2:07:25]
funding outside of your regular
[2:07:27]
payto-day operation.
[2:07:29]
>> The capital.
[2:07:29]
>> Yeah. Capital you pay for the reserve.
[2:07:31]
>> Yes. So that's so
[2:07:34]
>> $375,000.
[2:07:35]
>> Yeah.
[2:07:36]
>> Is not funded.
[2:07:38]
beath
[2:07:44]
and the Jews that pay for the Catholics
[2:07:49]
that come out
[2:07:51]
>> is that part of that 250
[2:07:54]
350 something
[2:07:57]
>> no
[2:07:58]
general fund to subsidize.
[2:08:00]
>> So that was um that that's what I was
[2:08:03]
talking about this blank face here. So
[2:08:06]
in 2024 we we moved $160,000 into 2013
[2:08:10]
we moved $113,000 in. So this year we're
[2:08:14]
hoping anything we make going on it's
[2:08:15]
going to hopefully thick thick tick
[2:08:16]
thick that number up and that's what we
[2:08:18]
use to pay for what's in the capital
[2:08:20]
request.
[2:08:21]
>> So we don't have the number for 2025
[2:08:23]
that's yet.
[2:08:23]
>> We do not because we get that number at
[2:08:25]
the end here to see what the actual
[2:08:27]
number say
[2:08:28]
>> and that would be used toward the 2026
[2:08:30]
to offset the capital
[2:08:33]
expenditure. Okay. I just want to go
[2:08:35]
ahead.
[2:08:40]
» Okay.
[2:08:42]
Oh, question to Mr. Farley's point.
[2:08:46]
Absolutely. I mean I I I don't know you have a golf advisory committee
[2:08:52]
and it brings uh raises or increase in
[2:08:55]
fees to that a year and you talk about
[2:08:58]
so again you want to maintain that line
[2:09:00]
that's that because
[2:09:04]
a lot of people golf in all different um
[2:09:07]
ages groups I see it there all different
[2:09:11]
people so
[2:09:14]
in I guess maybe 51 women that I golf
[2:09:17]
with at MU in different leagues. Um
[2:09:20]
there's probably two of us that are
[2:09:21]
residents. Most of them are
[2:09:23]
non-residents
[2:09:24]
and um they put up the biggest stake
[2:09:26]
about defeating some pain, but at least
[2:09:29]
they'll come back and there's really
[2:09:30]
nowhere been in the golf. So I just
[2:09:33]
wanted to bring that out there that
[2:09:34]
that's a little play thing you say.
[2:09:36]
Sometimes they can be disgruntled. The
[2:09:38]
golfers there, but um a lot of
[2:09:41]
non-residents golfing there, which we
[2:09:42]
get more money from which is fine.
[2:09:46]
I guess my uh this another thing about
[2:09:48]
youth is the fact that um you know
[2:09:50]
during the day you know they're in
[2:09:52]
school a lot of times are doing things.
[2:09:55]
>> So my suggestion would be we have these
[2:09:58]
beautiful beautiful new tennis courts
[2:10:02]
being put in where we don't charge any
[2:10:04]
fees for it. So that's something we can
[2:10:08]
start to discuss a line of revenue on
[2:10:10]
our tax.
[2:10:13]
My my understanding is that was is
[2:10:15]
supposed to happen when the new courts
[2:10:16]
go in. Um I don't know how that's been
[2:10:20]
worked through at all and talked about
[2:10:21]
at this point but it would make sense.
[2:10:23]
>> It will and
[2:10:26]
so I know that we part of our course we
[2:10:30]
have some partnerships um and there's
[2:10:32]
some agreements in place in order for
[2:10:33]
them to be you know as fantastic as
[2:10:36]
they're going to be. Um but I was going
[2:10:37]
to say to Mr. to Turo's point, it seems
[2:10:40]
like based on what the information we're
[2:10:41]
getting now, we, you know, we again, we
[2:10:44]
want to balance those tensions and I can
[2:10:46]
appreciate those that we're not just
[2:10:47]
saying, "Okay, let's make as much money
[2:10:49]
as we can and then we do close it out
[2:10:51]
for people, but it it seems like we're
[2:10:54]
in one of those situations where we have
[2:10:55]
one of those good problems where we have
[2:10:57]
more interest that makes managing it
[2:11:00]
comp complicated enough to where we have
[2:11:02]
to, you know, make sure that we're doing
[2:11:04]
it in a way that we can people because
[2:11:06]
there's such a high interest. So if we
[2:11:08]
have such a high interest, that seems
[2:11:10]
like the ideal place to um leverage that
[2:11:14]
interest and cut a check to make sure
[2:11:16]
our kids, you know, have jobs.
[2:11:21]
» We do have a pretty good pipeline,
[2:11:22]
right, to connect to the high school. In
[2:11:24]
fact, five of our hires this year came
[2:11:26]
from Connect.
[2:11:28]
>> It was and they worked out great. They
[2:11:30]
were all fantastic kids.
[2:11:32]
>> Yeah. Yeah. That's awesome.
[2:11:36]
» Yeah.
[2:11:37]
I'm just and I know that you may have an
[2:11:39]
opinion on this, but we're talking as
[2:11:41]
friends, colleagues, here um I will get
[2:11:44]
the numbers together like you asked. It
[2:11:46]
may be a large impact on honor. We'll
[2:11:50]
present it. Um to your point about the
[2:11:52]
tennis, I will say that is fantastic
[2:11:54]
point, but it also made me think about
[2:11:56]
other things in the park that are free
[2:11:59]
that draw a lot of people from outside
[2:12:01]
the city.
[2:12:05]
You said it might be an impact on what?
[2:12:07]
>> We put so much money into it outside of
[2:12:09]
the $20,000 that if it's Are you talking
[2:12:13]
about Music Haven?
[2:12:14]
>> Yeah. Well, we raise um I don't know
[2:12:16]
hundreds of thousands of dollars or
[2:12:18]
whatever to actually make the budget of
[2:12:19]
Music Haven and the city only
[2:12:21]
contributes $20,000
[2:12:23]
um to Music Haven. Um
[2:12:26]
>> but you were to actually charge the
[2:12:28]
people.
[2:12:31]
>> How would we do that? They come in over
[2:12:33]
the hill. I mean, they sit all over the
[2:12:34]
hills, all over the
[2:12:35]
>> people in the seats to pay for the seat
[2:12:37]
>> and you would I mean, we would you use a
[2:12:39]
snow fence. You would use a green snow
[2:12:41]
fence and you would actually I mean, and
[2:12:43]
once again, you would say it's for a
[2:12:44]
youth program. I mean, the I'm just
[2:12:47]
saying is if we're going down this road
[2:12:49]
and we're trying to fund a youth, a
[2:12:50]
youth program
[2:12:52]
>> and we're trying to do it, then we have
[2:12:54]
to look at all the revenue. Sure. You
[2:12:55]
know, I mean, and and
[2:12:57]
>> I don't know. I would just point out
[2:12:58]
that um again, sorry to interrupt, but
[2:13:01]
again um we have donors that um purchase
[2:13:05]
the seats, purchase the bricks, purchase
[2:13:07]
all sorts of things. They sponsor the
[2:13:09]
concerts. Um, I mean it's like the I
[2:13:13]
would have I can't remember off the top
[2:13:15]
of my head what the total budget is for
[2:13:16]
Music Haven, but $20,000 of it is all
[2:13:19]
that the city gets and everything else
[2:13:21]
is coming from things that they sell to
[2:13:24]
people that come, all the food that
[2:13:26]
people buy and the and the beverages
[2:13:28]
that people buy. But mostly it's the
[2:13:31]
fundraising where if you look on the
[2:13:33]
side of the stage, I mean, you can see
[2:13:36]
that there's people um myself included
[2:13:39]
that have donated money uh to have the
[2:13:41]
name up on the brick, but mostly because
[2:13:43]
they value the the um what music haven
[2:13:47]
brings to the park, especially in terms
[2:13:49]
of the diversity um in terms of the fact
[2:13:53]
that it is this sort of multicultural
[2:13:55]
experience um in terms of the music that
[2:13:58]
comes. But I appreciate what you're
[2:13:59]
saying. I can get I can get the specific
[2:14:02]
figures on how much the the budget I
[2:14:04]
mean I know that's one of my volunteer
[2:14:06]
things is trying to help them raise
[2:14:07]
money uh every year because it is it's
[2:14:10]
just you know if we if we had to
[2:14:12]
actually pay for what happens in that in
[2:14:15]
that would be I can't remember exactly
[2:14:17]
what it is but I feel like it's like a
[2:14:19]
couple hundred,000 but do you remember
[2:14:23]
for music haven in terms of its total
[2:14:25]
budget?
[2:14:27]
I I don't remember what it is actually,
[2:14:29]
but that was I mean is it my I actually
[2:14:33]
still had a couple of questions, but um
[2:14:37]
>> I don't know. I get what you're saying
[2:14:38]
though. But um
[2:14:39]
>> just because you know $50,000 is more
[2:14:43]
attainable than $150,000 for the golf
[2:14:45]
course. So if you were to go 50 50 and
[2:14:48]
it's a park, you know, the parks
[2:14:50]
generate the money in excess for the
[2:14:53]
program. It may be more attainive, but I
[2:16:23]
ing stations at the golf course. Yeah.
[2:16:25]
>> Prior
[2:16:26]
>> I'm sorry.
[2:16:27]
>> Prior to our installation of the two did
[2:16:29]
not happen.
[2:16:30]
>> Okay. So, the two charging stations that
[2:16:32]
are now there, that's what you're
[2:16:34]
charging all those 60 parts. Those are
[2:16:37]
Oh, that's what I was Oh, that's
[2:16:39]
>> Oh, you're talking about the electrical.
[2:16:40]
>> Yeah, I was trying to figure out how we
[2:16:42]
charge those cars if we
[2:16:43]
>> No, there's two there's two electrical
[2:16:45]
uh charging stations for vehicles.
[2:16:47]
>> Okay.
[2:16:48]
>> In the parking lot this year.
[2:16:50]
>> Separate charging station.
[2:16:54]
All those chargers were in the car bar
[2:16:55]
and that was that was a massive that was
[2:16:57]
updated
[2:16:59]
handled the capacity for that.
[2:17:00]
>> Okay. Thank you. I just I was like how
[2:17:02]
could we not have a charging station
[2:17:04]
going? This is in the third year of that
[2:17:06]
lease.
[2:17:09]
>> Next year we're actually going to be
[2:17:10]
bringing a new program to the course I
[2:17:12]
forgot to mention called PJO.
[2:17:17]
» It's a rework military program.
[2:17:19]
>> Cool.
[2:17:20]
>> Um and both Jeff Mati and myself are now
[2:17:23]
certified. Uh there's actually a
[2:17:25]
training seminar you have to attend
[2:17:28]
because you're dealing with individuals
[2:17:30]
that you know post-traumatic stress
[2:17:32]
disorder um loss of limbs um I had a
[2:17:35]
gentleman who had no legs and one arm
[2:17:38]
and he's sitting in a wheel specific
[2:17:40]
wheelchair and he learned how to play
[2:17:42]
golf with one arm
[2:17:43]
>> and so it really kind of brings you back
[2:17:45]
to reality when you see an individual
[2:17:47]
like that and the joy it brings them and
[2:17:50]
they felt that the the PJ uh program is
[2:17:53]
the saved their lives.
[2:18:36]
So what we have here first are two
[2:18:39]
fairway mowers. These are our large
[2:18:42]
workforce mowers um that uh that we um
[2:18:46]
the existing mowers we have are about 10
[2:18:49]
years old. So we're looking to replace
[2:18:51]
both of those. Um, the second thing,
[2:18:53]
like I said, is a T- mower. It's more
[2:18:55]
specialty, smaller piece of equipment
[2:18:56]
that we use for mowing our TE's. Uh, the
[2:19:02]
Ventra with duals. That is a workhorse
[2:19:06]
mower. It's a very unique mower um that
[2:19:09]
has uh sets of dual tires on the fronts
[2:19:11]
and backs and a deck that is warm, a
[2:19:15]
rough top deck. And what we use that for
[2:19:18]
are inclines and steep hillsides. Um,
[2:19:21]
it's a very stable like a goat mower.
[2:19:24]
It'll go around. Very neat mower that we
[2:19:26]
have, but we bought it seven or eight
[2:19:30]
years ago used off of a contract and now
[2:19:33]
we were looking to replace it.
[2:19:35]
>> Uh, the Verticut 3 points, those are
[2:19:37]
actually um
[2:19:39]
>> I think that is just another smaller
[2:19:41]
mower, more hand mower. And then the
[2:19:42]
units for the 33, those are actually
[2:19:44]
just cutting units. They're just like
[2:19:47]
razor blades that would go on to the the
[2:19:50]
mower. So you can buy those separate
[2:19:51]
from the mower. And then the facility
[2:19:54]
improvements. Um we're looking to
[2:19:56]
replace the boiler. Um we did talk with
[2:19:59]
Miy looking to operate the restaurant
[2:20:03]
all year. Um not fulltime but all year.
[2:20:06]
And we would like to make sure that the
[2:20:08]
boiler uh operates. So we're getting
[2:20:10]
quotes on that now. Actually, uh we're
[2:20:13]
also looking to do hallway improvements
[2:20:15]
with that money. Um, if you may or may
[2:20:18]
not be aware, there is a hallway between
[2:20:23]
where the female locker room can be in
[2:20:25]
our utility room. We would like to
[2:20:27]
reopen that for the winter season so
[2:20:29]
that um, patrons to the restaurant do
[2:20:31]
not have to walk up the hill. They can
[2:20:32]
walk through the hallway and up the
[2:20:34]
stairway.
[2:20:36]
We think that's the preferred path for
[2:20:38]
visiting the restaurant in the winter
[2:20:39]
months. And then Matt would like to uh
[2:20:43]
purchase a new merchandise counter. Um
[2:20:45]
the current counter was uh created by
[2:20:49]
our in-house carpenters almost a decade
[2:20:52]
ago is um literally a glass bot with two
[2:20:58]
um podiums on either side that the
[2:21:00]
carpenters made and we'd like to have
[2:21:02]
more of a professional front back
[2:21:04]
counter for merchandise.
[2:21:09]
» Any questions?
[2:21:10]
>> Yes, thank you. I don't I thought that
[2:21:12]
was um proposed a few years ago. Your
[2:21:15]
counter out there and we didn't have
[2:21:17]
funding for that or
[2:21:18]
>> No, it was a little more than we
[2:21:20]
thought. I think we only put like 5,000
[2:21:21]
in the budget. Ended up being closer to
[2:21:23]
10 or 15. So that's where we moved it
[2:21:25]
out of operating. We moved it into
[2:21:27]
capitals reserves. But yeah, it ended up
[2:21:30]
being, you know, essentially all
[2:21:32]
customer,
[2:21:33]
>> right?
[2:21:34]
>> And your merchandise is huge up there. I
[2:21:36]
mean, do you get a lot of sales on the
[2:21:37]
merchandise? Yeah. Especially Yeah.
[2:21:39]
We've done a lot more this year than any
[2:21:40]
year.
[2:21:41]
>> Okay. Um
[2:21:42]
>> but it just like to Chris's point, it'll
[2:21:44]
be much more professional looking. Um
[2:21:47]
and just kind of fits with all the work
[2:21:49]
that we've been doing out there.
[2:21:50]
>> Right. Absolutely.
[2:21:52]
>> And how about um under the under your
[2:21:55]
capital improvements some work to the
[2:21:57]
forward tea boxes
[2:21:59]
[Laughter]
[2:21:59]
[Music]
[2:22:03]
and so forth.
[2:22:07]
>> More friendly.
[2:22:09]
more not in the line of the back.
[2:22:14]
>> We could get the we could get the
[2:22:15]
lightning box like
[2:22:18]
>> well a few of the former tea boxes the
[2:22:20]
place more
[2:22:22]
>> closer to the hole.
[2:22:24]
>> You say they're in line with the back
[2:22:25]
ones.
[2:22:26]
>> Oh yeah.
[2:22:27]
>> Nine and 18.
[2:22:28]
>> You mean being off the side?
[2:22:30]
>> Yeah.
[2:22:32]
a lot of people talk about the forward
[2:22:34]
see blacks as being more
[2:22:36]
>> I wouldn't even want to say woman
[2:22:37]
friendly more senior friendly
[2:22:39]
>> kind of more centered
[2:22:41]
>> yeah okay that's
[2:22:44]
>> yeah are we going to have to fund
[2:22:47]
>> I can probably put a collection up with
[2:22:49]
the
[2:22:50]
>> the ladies you know of course
[2:22:52]
>> we we do need that
[2:22:53]
>> they they still think it's a man's sport
[2:22:55]
you know and um they still think Rudy is
[2:22:57]
a old old man's
[2:23:00]
today. Oh, for years, but it's not
[2:23:03]
changing.
[2:23:05]
But there are some some tea boxes that
[2:23:08]
could use improvement. I put that in the
[2:23:10]
cap.
[2:23:10]
>> Sure is the correct ter.
[2:23:12]
>> I can definitely address that with our
[2:23:14]
maintenance staff and see if they can
[2:23:16]
I'll some suggestions.
[2:23:19]
>> We are that would be great.
[2:23:22]
We are renting just to let you know a
[2:23:24]
project that I've been wanting to do
[2:23:25]
Matt for a decade is what I call between
[2:23:30]
goals four and five. It is a dirt cart
[2:23:33]
path
[2:23:36]
that is no longer used, hasn't been used
[2:23:38]
for 10 years. And our superintendent uh
[2:23:40]
we are running a mini bulldozer and will
[2:23:43]
be covering it, fescuing it, and making
[2:23:47]
sure the carts don't go in. And I I
[2:23:49]
really do think it's just one of those
[2:23:50]
little things that when we do it, it's
[2:23:52]
going to make us just look every year
[2:23:54]
just that little bit better because now
[2:23:55]
when you're on the T- box for five next
[2:23:58]
year when you look out, you won't be
[2:23:59]
seeing this arbitrary
[2:24:02]
road in the middle of what should be a
[2:24:04]
new area. So the golfers probably won't
[2:24:07]
appreciate having that road because when
[2:24:08]
you go right, you can kind of drive on
[2:24:10]
it. But, you know, keep your ball in
[2:24:11]
fair.
[2:24:14]
>> And one more question. And I I don't
[2:24:15]
know if I brought this forward last year
[2:24:17]
or in one of your meetings. Um a shelter
[2:24:20]
furthest from the thought uh from the
[2:24:22]
course for lightning and things like
[2:24:24]
that.
[2:24:24]
>> Bring that up last night.
[2:24:25]
>> A lot of times it's hard to get in
[2:24:27]
especially if you're walking. So I just
[2:24:29]
put that up right here.
[2:24:30]
>> The lightning sensors.
[2:24:33]
So
[2:24:33]
>> do you notice those?
[2:24:34]
>> Oh gosh. Yeah. Yeah. And they scream.
[2:24:37]
>> No. Sensors that were put on part of the
[2:24:40]
improvement. So it's a storm approaches
[2:24:43]
again. how many miles out
[2:24:45]
>> they shouldn't
[2:24:46]
be at risk so that they're given notice
[2:24:48]
and should get off the court.
[2:24:50]
>> That's great.
[2:24:50]
>> Yeah, it's a lightning detection system
[2:24:52]
that was included when we put the
[2:24:54]
irrigation in and they're in the corners
[2:24:56]
of the golf course from more farreaching
[2:24:58]
areas.
[2:24:59]
>> And if it's detected within a 5 mile
[2:25:02]
radius, they go off and so it alerts the
[2:25:05]
golfers to that there is lightning in
[2:25:07]
the area. Maybe not directly overhead,
[2:25:09]
but in the area and to be aware of it.
[2:25:12]
>> That's great. Same Dorian is not coming
[2:25:14]
off the course. What do you do?
[2:25:16]
>> Well, somebody comes out to get them.
[2:25:18]
Yeah.
[2:25:18]
>> Yeah. We actually do. We'll take a storm
[2:25:21]
coming. We actually make rounds out
[2:25:22]
there making sure everybody comes in.
[2:25:24]
>> Yeah.
[2:25:25]
Cuz there are people like Tony
[2:25:28]
Barber husband Tony Ward. He's sitting
[2:25:31]
on a bench on the 14th hole under
[2:25:33]
umbrella. Tony, what in the world are
[2:25:34]
you doing out there? I I dragging.
[2:25:40]
>> All right. Any other question? top of
[2:25:42]
that, please. I do think it's important
[2:25:43]
to know there are a number of residents
[2:25:45]
in our community that do not golf. I'm
[2:25:47]
one of them. It is not because I've
[2:25:49]
never done it. It's partly because the
[2:25:51]
fact I think in my my age, I think it'd
[2:25:54]
be difficult to not be good at
[2:25:55]
something. So, I think it's out of pride
[2:25:57]
that I did not go. Um, but sincerely,
[2:26:00]
correct me if I'm wrong, Mr. Wallen, the
[2:26:02]
projects that Mr. Toro will highlight,
[2:26:03]
those would be ones that you would add
[2:26:05]
to your list to identify um pathways
[2:26:08]
forward correction.
[2:26:12]
uh projects which these
[2:26:17]
specific
[2:26:18]
>> the concepts that were presented tonight
[2:26:20]
those were all additional projects that
[2:26:21]
you would have to weigh and levy as you
[2:26:23]
manage your other
[2:26:24]
>> oh yes they're all yeah they're all
[2:26:26]
under
[2:26:27]
>> thank you freaking a point I think it's
[2:26:29]
important to make sure that we're
[2:26:30]
balancing like the efforts of the city
[2:26:32]
and sincerely think this is all wrapping
[2:26:34]
into the comment from Mr. Harley, I
[2:26:37]
think if we're intentional with drawing
[2:26:39]
a little bit more, I think being
[2:26:40]
considerate to the fact of don't break
[2:26:42]
something that's not broken and we have
[2:26:44]
or don't it works it works well do in
[2:26:48]
part to the management and the support
[2:26:50]
from the city. Uh but sincerely I
[2:26:52]
imagine there's individuals listening at
[2:26:53]
home that we put $3 million in this park
[2:26:57]
in this golf course
[2:26:59]
don't think it's a difficult thing to
[2:27:00]
intentionally pull out a little bit more
[2:27:02]
beyond what already is. And then the
[2:27:04]
other comment I wanted to highlight is
[2:27:06]
it's a discussion me and Morfield often
[2:27:08]
have of the concept or misconception of
[2:27:11]
free and I think that makes a lot of
[2:27:13]
things difficult because there's always
[2:27:15]
a cost. Um so I think I would balance
[2:27:18]
that in a very um
[2:27:23]
not disenfranchised community but we
[2:27:24]
have a community with a lot of needs and
[2:27:26]
often times we hear how some of the
[2:27:28]
resources we have in the city are taken
[2:27:30]
advantage of. So I think it's important
[2:27:31]
to make sure we are intentionally
[2:27:34]
adding more safety measures. So there
[2:27:36]
are specific considerations for the
[2:27:38]
community with respect to the youth
[2:27:40]
service line but I think in other areas.
[2:27:44]
» Thank you.
[2:27:46]
>> Are there any more question comments?
[2:27:49]
>> Just one comment
[2:27:52]
or maybe two respond like that.
[2:27:55]
So um so I just want us again
[2:27:59]
>> we we can talk about this youth service
[2:28:01]
line as a expense but that would be not
[2:28:06]
looking at it as an investment the same
[2:28:09]
way that we invest into uh the golf
[2:28:11]
course and invest into our parks. There
[2:28:13]
there's an investment here and that
[2:28:15]
money again is some of the money that
[2:28:18]
circulates in our community at a higher
[2:28:20]
level than any other money is used in
[2:28:22]
employment and youth services. and then
[2:28:25]
to factor in our public safety money.
[2:28:27]
So, I just want to make sure that we're
[2:28:28]
looking through that, you know, through
[2:28:29]
the right prison, if you will. That's
[2:28:31]
all.
[2:28:33]
>> Are there any other comments, questions?
[2:28:35]
Seeing none. Thank you so much. Thank
[2:28:37]
you so much.
[2:28:38]
>> Thank you, Chris. Thank you for all that
[2:28:40]
you guys are doing.
[2:28:42]
>> Thank you. Keep up the good work.
[2:28:44]
Um,
[2:28:54]
I want you to make noise.
[2:42:04]
Boys and girls,
[2:42:06]
>> thank you. I
[2:42:08]
>> um we'll restart and we'll stay on
[2:42:11]
capital funding and we'll go on to
[2:42:14]
utilities and it
[2:42:19]
» is taking the lead.
[2:42:23]
Um
[2:42:24]
>> walk us through the equipment.
[2:42:26]
>> Sorry.
[2:42:28]
>> No, no, I'm talking about capital.
[2:42:30]
>> Oh, capital.
[2:42:31]
>> Page 91.
[2:42:33]
>> All right. So, the first thing I'd like
[2:42:36]
to address is the sign fabrication
[2:42:38]
upgrade that comes with a new latex
[2:42:40]
printer, laminator, and some vinyl to
[2:42:42]
get us started for making signs. The way
[2:42:45]
that we make signs right now, if you're
[2:42:47]
all aware, we uh screen print. So, you
[2:42:50]
can get away with it for your typical
[2:42:51]
road sign, but with any other sign where
[2:42:53]
the text maybe gets a little bit
[2:42:55]
smaller, it is a pain. So um it would
[2:42:59]
save time, money, material effort, um
[2:43:03]
all that and it would create a better
[2:43:04]
looking sign in the long run. So I'm
[2:43:07]
really a big advocate for this
[2:43:09]
revolutionize the way we make signs in
[2:43:10]
my apartment.
[2:43:15]
» This one is the smart note upgrade.
[2:43:18]
>> Oh, sorry. you have installed.
[2:43:21]
>> It is the um upgrading of the 200 city
[2:43:25]
IQ nodes that we currently have along
[2:43:27]
State Street. So, uh it's an antiquated
[2:43:30]
piece of equipment for uh smart nodes.
[2:43:33]
They don't give us the same speed, air
[2:43:35]
quality, uh noise data that we get. I
[2:43:38]
don't sure you all familiar with that
[2:43:40]
speed report that I put together. That
[2:43:42]
would be that last piece and it would be
[2:43:44]
like the hole filling the hole in the
[2:43:46]
picture of the the picture that we're
[2:43:47]
painting for speed data. So it would be
[2:43:49]
very important for us um residents
[2:43:53]
um just going forward in general to uh
[2:43:57]
promote safety.
[2:43:59]
>> And you mentioned 2001
[2:44:02]
200 CIQ notes to be replaced with the uh
[2:44:05]
you need
[2:44:08]
up toate smart.
[2:44:14]
» Okay.
[2:44:16]
Go ahead.
[2:44:19]
>> Congress. Um,
[2:44:21]
we do we have like the smart city
[2:44:25]
opening side. Is that anybody
[2:44:29]
able to to cover part of this?
[2:44:32]
I don't know where we are with it,
[2:44:35]
but I know we put money aside. So, I'm
[2:44:37]
just wondering if any part of the
[2:44:39]
vaccine is something that could be sent
[2:44:41]
here.
[2:44:43]
>> I don't believe so.
[2:44:45]
exhaust those funds. We actually got
[2:44:48]
another grant from the smart city
[2:44:50]
initiative to continue our efforts into
[2:44:52]
devel. But that's for further AP and
[2:44:55]
fiber. nothing in relation to what I
[2:44:58]
described there.
[2:45:01]
>> But
[2:45:05]
I not
[2:45:17]
Brian and I looked at it. Um like as he
[2:45:20]
stated, majority of the funds are
[2:45:21]
exhausted. So um we need this funding
[2:45:24]
source um to get this part
[2:45:27]
>> you can um have a listing money and have
[2:45:31]
extensive because it last wasn't
[2:45:34]
something that was
[2:45:38]
thank you
[2:45:39]
>> for how many years
[2:45:41]
>> from the beginning to now
[2:45:43]
>> um I'm going to say in the past three
[2:45:45]
years
[2:45:47]
>> commissioner you mentioned the money is
[2:45:49]
expended does that mean that um the
[2:45:51]
money is all spent or is it just that uh
[2:45:55]
we have open purchase orders?
[2:45:58]
>> I would have to uh double check that but
[2:46:00]
I believe the majority um if not all
[2:46:03]
have been exhausted.
[2:46:06]
So okay so pain can provide us
[2:46:10]
if it's all
[2:46:14]
there any outstanding appeals
[2:46:17]
>> all
[2:46:20]
any other question before you go on to
[2:46:22]
your next item
[2:46:24]
>> middle item that's
[2:46:26]
>> yeah please
[2:46:27]
>> truck attachments
[2:46:28]
>> truck attachment
[2:46:29]
>> it's basically ease of use for a new
[2:46:32]
spray that we got will go onto a truck
[2:46:34]
that we actually outlined right now um
[2:46:36]
just you know upgrade our our process.
[2:46:46]
» Any other question? Go ahead.
[2:46:47]
>> So the smart mode upgrade that will
[2:46:51]
coincide with the grant that we just
[2:46:54]
got.
[2:46:55]
>> How does that how do those things work
[2:46:57]
to each other?
[2:46:58]
Um so we will have uh the more APS that
[2:47:04]
will be putting up and developing as
[2:47:06]
part of that smart city initiative.
[2:47:07]
>> Okay.
[2:47:08]
>> Grant that we just got
[2:47:10]
>> this will be APS are access points.
[2:47:12]
They're like you know a big rout just to
[2:47:15]
get internet. Um these smart nodes will
[2:47:18]
be a data point for the city to use
[2:47:22]
gather speed sound data. So it's
[2:47:25]
different but
[2:47:26]
>> related but not Okay.
[2:47:27]
>> Right.
[2:47:30]
>> So um the grant could you just be
[2:47:33]
specific about the grant? Are you
[2:47:34]
talking about the 1.6 million of that?
[2:47:35]
>> Correct.
[2:47:36]
>> And so
[2:47:38]
that's separate in parts from what we
[2:47:40]
have here and can't be used for.
[2:47:45]
>> Thank you.
[2:47:48]
So that is one that connect all state
[2:47:51]
brand that is more focused on the mobile
[2:47:55]
devices or something signals uh we have
[2:47:57]
around the area to boost those things
[2:48:00]
that is the like the main functionality
[2:48:03]
of that grant.
[2:48:04]
>> Mhm.
[2:48:06]
>> Any question on the capital fun
[2:48:10]
thank you for the capital.
[2:48:13]
So we will go to page 24
[2:48:17]
utilities administration
[2:48:21]
commissioner
[2:48:26]
53
[2:48:29]
[Music]
[2:48:34]
just want to give us highlights what's
[2:48:36]
happening in utility
[2:48:41]
they're carried over
[2:48:44]
everything 24 from last budget.
[2:48:49]
One thing I did want to bring I'm
[2:48:52]
getting a little ahead of myself but
[2:48:53]
with the painters I'm sorry
[2:48:57]
no everything's pretty much
[2:48:59]
>> yeah let's let's stay with the u utility
[2:49:02]
administration and then
[2:49:04]
we'll go into the next uh department.
[2:49:08]
Any questions on the utility
[2:49:11]
administration?
[2:49:12]
>> These are just steps
[2:49:15]
for the IPS
[2:49:18]
who pretend those are just basically
[2:49:21]
correct.
[2:49:27]
» Any other questions?
[2:49:28]
>> Yes.
[2:49:29]
>> Who's the site for?
[2:49:33]
» Thank you.
[2:49:35]
I do want to make a small note and I
[2:49:38]
apologize for these saying this just
[2:49:39]
revealing my numbers. I was revising the one that I may be here
[2:49:45]
between 404 fees for services 6500
[2:49:50]
>> 7,000 would be
[2:49:52]
again but that's not acceptable I accept
[2:49:55]
that but that's my request.
[2:49:59]
So are you saying so 6,500 you're asking
[2:50:02]
for more?
[2:50:03]
>> 500 more. So 7,000.
[2:50:06]
>> Okay.
[2:50:07]
>> Sorry about that.
[2:50:10]
16.
[2:50:14]
» Any other questions?
[2:50:16]
Seeing none, we'll move to pave
[2:50:23]
» 35 and that is utility sign maintenance.
[2:50:27]
I do have a question from Mary.
[2:50:29]
>> Oh, um, so for the travel conferences, I
[2:50:33]
see that you're in love with that line.
[2:50:35]
There's no time that you ever travel. I
[2:50:36]
mean, because the IT business is like
[2:50:38]
ever changing. So there's no ever any
[2:50:41]
time that you're ever
[2:50:43]
global expenses for that conferences.
[2:50:47]
Um,
[2:50:50]
there I saw that 24 there wasn't a lot
[2:50:53]
spent, but in 23 there was. So I just
[2:50:57]
went to my first conference. Um there
[2:51:00]
was that's probably going to be the one
[2:51:01]
that I go to unless there's something
[2:51:03]
else that comes about. So I budgeted
[2:51:05]
just enough to cover that one conference
[2:51:07]
which is honestly not allowed. So
[2:51:10]
>> okay
[2:51:10]
>> that's where I felt comfortable cutting
[2:51:12]
very
[2:51:12]
>> okay the local conference
[2:51:15]
>> uh you got
[2:51:16]
>> okay so is it generally local because my
[2:51:18]
concern is that if we're talking about
[2:51:20]
the United conference then that becomes
[2:51:24]
uh a little bit more expensive but is it
[2:51:26]
generally local
[2:51:28]
>> it's the only one I was aware of I can
[2:51:30]
ask John and see if there's um any other
[2:51:33]
ones out there that possibly could
[2:51:34]
require some travel but he did not
[2:51:36]
allude to us so I wouldn't that there is
[2:51:38]
one out Yeah.
[2:51:41]
The cut that I made there, I believe.
[2:51:44]
>> Okay.
[2:51:49]
» Any other question?
[2:51:53]
We'll move through
[2:51:57]
36 35 potential 36 and that is utility
[2:52:02]
sign payments
[2:52:04]
side mainten,000
[2:52:12]
left to address um the bills for
[2:52:15]
painters
[2:52:17]
by one
[2:52:19]
>> should be three I missed that on my part
[2:52:22]
um
[2:52:24]
it was budgeted. So what happened was
[2:52:26]
there's a cleaner that is currently
[2:52:28]
still transitioning to be a painting
[2:52:30]
crew um which kind of led to the mishap
[2:52:34]
there but I believe he was budgeted for
[2:52:36]
on the facility side of things as a
[2:52:38]
cleaner
[2:52:41]
would be able to
[2:52:46]
» so there needs to be movement an adjust
[2:52:48]
sorry an adjustment here from being
[2:52:51]
clean back into the painter
[2:52:54]
Commission making notes.
[2:52:57]
>> It's running over.
[2:52:58]
>> Okay.
[2:53:03]
» Go ahead, please.
[2:53:05]
>> Oh, is the cleaner then? Whose budget is
[2:53:08]
that in a cleaner?
[2:53:09]
>> So,
[2:53:11]
>> they have six cleaners that currently
[2:53:16]
sell one of those six.
[2:53:18]
>> Okay.
[2:53:20]
>> Thank you. So this would stay at the at
[2:53:22]
the the two
[2:53:25]
>> here.
[2:53:27]
>> Oh shifted from facilities would go
[2:53:29]
down.
[2:53:29]
>> No.
[2:53:34]
» So a cleaner uh moved or in the process
[2:53:38]
of moving to the cleaner position. They
[2:53:40]
have currently two films two individuals
[2:53:42]
in this department and making
[2:53:45]
it usually
[2:53:48]
position. That's why it was removed. But
[2:53:49]
this individual has moved in. I think it
[2:53:52]
was at the end of September.
[2:53:53]
>> It's officially still be going through
[2:53:56]
civil service at the moment. So, it's
[2:53:57]
not quite official, which is why it's
[2:53:59]
like limbo at the moment.
[2:54:03]
» How much? But you also said that they still want to say six claims.
[2:54:09]
So, does that mean that there would be a
[2:54:11]
vacancy of the petition would be there?
[2:54:14]
will be a vacancy once the
[2:54:16]
transition completed.
[2:54:18]
>> Okay. And so what would that increase
[2:54:20]
this budget?
[2:54:23]
>> This paint
[2:54:30]
less than 60,000.
[2:54:34]
Additionally 55,000
[2:54:39]
here
[2:54:45]
benefits.
[2:54:49]
See
[2:54:59]
it up to 170.
[2:55:11]
So is the payment make the same um same
[2:55:14]
salary that they're making
[2:55:17]
as clean currently?
[2:55:19]
>> No increase.
[2:55:20]
>> Okay.
[2:55:22]
>> Thank you.
[2:55:26]
» Please go ahead. uh not that you can be
[2:55:29]
excuse me knowledgeable like operations
[2:55:31]
in other areas for departments but um
[2:55:34]
with respect to waste removal and how
[2:55:36]
they use like uh um Mos um how
[2:55:40]
interchangeable are painters like is
[2:55:42]
that a position where right here you
[2:55:44]
have painter and
[2:55:48]
sign maintenance that's the A3310
[2:55:52]
and there's also a painter in property
[2:55:54]
management which is A1621
[2:55:57]
21. Is there is there any
[2:55:59]
interchangeability?
[2:56:08]
» Are there any other question for the
[2:56:10]
section
[2:56:12]
maintenance? Seeing none, we'll move to
[2:56:15]
the next page. Utilities traffic.
[2:56:22]
Yes, that increased by 34.5%
[2:56:27]
approximately 144,000.
[2:56:31]
» I'm sorry, what page you said? I'm
[2:56:33]
sorry.
[2:56:33]
>> 37.
[2:56:35]
>> Okay, thanks.
[2:56:37]
>> Anything to highlight?
[2:56:40]
>> Sorry that we have two line workers
[2:56:42]
currently and down the line we have
[2:56:46]
three, but that's you know future talk.
[2:56:49]
right now as this budget this is correct
[2:56:51]
just something to prepare for in the
[2:56:53]
future. We these two gentlemen are
[2:56:56]
towards the end of their you know
[2:56:57]
working careers and ideally we have some
[2:57:01]
weight in the wings to learn but might
[2:57:02]
be a cross trainining sort of situation.
[2:57:04]
So three should be the number that we uh
[2:57:08]
look to have in the future but the math
[2:57:11]
remain two as we cross train this.
[2:57:15]
So you you had the um in 25 the adopted
[2:57:19]
budget was two. Were both of those
[2:57:21]
positions filled?
[2:57:23]
>> We had a supervising line worker.
[2:57:27]
>> So you we moved one of the line workers
[2:57:29]
to the supervisor position.
[2:57:32]
>> Thank you.
[2:57:34]
>> Any other questions?
[2:57:38]
Seeing none, we'll move to page
[2:57:42]
51.
[2:57:46]
for the bottom three
[2:57:50]
include 5.15%
[2:57:54]
approximately 3600.
[2:58:12]
Um
[2:58:14]
>> street lighting that has to do with
[2:58:16]
administrative expense life follows.
[2:58:20]
>> Yeah
[2:58:21]
expense 42. Yeah. So that's for the
[2:58:26]
um
[2:58:28]
yeah services which we have uh in Japan
[2:58:33]
Jones and service fee. So I think
[2:58:36]
they're increasing a little bit in their
[2:58:39]
um annual maintenance rate. So that's a
[2:58:44]
little bit higher than that. Expensive
[2:58:49]
the annual maintenance they're
[2:58:51]
increasing from part.
[2:59:02]
So you're saying that the light bulb gas
[2:59:04]
any
[2:59:07]
light gas I think is the
[2:59:12]
» Yeah.
[2:59:26]
» Oh no. We're just asking about the
[2:59:27]
light. Yes. In terms of the the numbers,
[2:59:31]
does that cover any smart city program
[2:59:34]
under this light?
[2:59:36]
>> I don't believe so.
[2:59:38]
>> No, it doesn't.
[2:59:39]
>> White power and gas. That's that's
[2:59:41]
strictly national.
[2:59:45]
» And then we're at 1.3 million here to
[2:59:48]
date as of uh September.
[2:59:52]
>> Okay.
[2:59:57]
Do you have any other thoughts or
[3:00:00]
so? 1.3 million pounds. You think that's
[3:00:04]
enough budgeted for with the increases I
[3:00:07]
mean we're personally facing
[3:00:09]
>> at home? I'm sure you work these numbers
[3:00:12]
out, but you think that's enough to get
[3:00:13]
us through next year? I think so.
[3:00:15]
>> Okay.
[3:00:19]
Any other questions?
[3:00:20]
>> I'm sorry. I think I must have missed
[3:00:22]
this flipping but um what's in the
[3:00:25]
administrative expense there?
[3:00:28]
>> Um yeah so is uh the annual uh
[3:00:33]
maintenance cost uh which we have to pay
[3:00:36]
to BPM for all the loads we talked
[3:00:39]
about. So like 200 upgrading to that but
[3:00:44]
we have like 700 total.
[3:00:47]
725
[3:00:48]
>> 725 on that the charge went up on that.
[3:00:53]
>> Wow.
[3:00:53]
>> So they're increasing um actually you
[3:00:56]
know they're increasing
[3:00:59]
I don't know it's like 57 grand or
[3:01:01]
something.
[3:01:02]
>> Yeah. So that's the data so they're
[3:01:05]
increasing.
[3:01:08]
>> Is that why we saw that huge jump from
[3:01:10]
2024 to 2025?
[3:01:13]
>> Yeah. 2025 not one month but 2026 is
[3:01:17]
>> 57 57 that's what you mentioned 57,000
[3:01:21]
increase
[3:01:22]
>> and that's going directly to the the
[3:01:24]
service provider
[3:01:25]
>> yeah service provider and we spoke to
[3:01:28]
service provider tried to negotiate it
[3:01:31]
brought the cost down that's why you see
[3:01:33]
this number this was like 90 grand
[3:01:36]
before
[3:01:39]
and try to bring the cost Yeah.
[3:01:49]
» Any other questions for this department?
[3:01:52]
See none. Thank you so much. Thanks.
[3:01:57]
Good work.
[3:01:59]
Okay,
[3:02:01]
we are going to close the page 61.
[3:02:08]
Let's start.
[3:02:20]
Sorry.
[3:02:26]
» Yeah.
[3:02:30]
» That's pretty darn good.
[3:02:37]
» Okay. The development 8686 page 61
[3:02:41]
increase by 0.58% approximately 3000
[3:02:47]
increase.
[3:03:05]
So for the salaries, all of these
[3:03:09]
positions are currently filled with
[3:03:11]
exception of our principal planner
[3:03:14]
recently
[3:03:18]
resign.
[3:03:25]
» No
[3:03:29]
highlight. you don't need. Sir,
[3:03:31]
>> one question um that I need to mention
[3:03:35]
is the number for
[3:03:38]
overtime for the admin salaries went
[3:03:41]
down to 500
[3:03:43]
and we have to be able even though I do
[3:03:46]
encourage my team to do comp time. We
[3:03:49]
really need a line item there because if
[3:03:51]
they choose to, especially with missing
[3:03:55]
um the principal planner right now would
[3:03:57]
like to be able to have that option if
[3:03:59]
they work over. Now, they do really well
[3:04:01]
with doing that with company time, but I
[3:04:04]
think 500 is pretty much zero when I
[3:04:08]
have two people managing my plan.
[3:04:19]
So
[3:04:22]
>> overtime is that like a
[3:04:28]
» so so and department like there's like a
[3:04:31]
stipen for overtime, right? So
[3:04:36]
>> it's not just over.
[3:04:39]
>> Oh, for the contractual people they see.
[3:04:41]
Oh, okay.
[3:04:43]
>> Plan commission zone board.
[3:04:50]
So that $500
[3:04:53]
that is in the budget is supposed to go
[3:04:56]
for the three current people on staff
[3:04:59]
that they choose to do overtime
[3:05:01]
attending their commission.
[3:05:07]
Is that really?
[3:05:09]
>> No, but like I said, most of the time
[3:05:11]
they they are okay fulfilling comp time,
[3:05:14]
but I would like them to remain the
[3:05:16]
remaining thousand just in case
[3:05:18]
something occurs in their um you know
[3:05:21]
compound doesn't work like
[3:05:24]
>> I have another part of my question as
[3:05:26]
well. Um so I noticed that other
[3:05:29]
department heads had stipens but I don't
[3:05:32]
see any sip
[3:05:34]
um in your
[3:05:36]
department originally um we did submit
[3:05:39]
for stipen which was for ser for um
[3:05:44]
$7,000 which would be for two um
[3:05:46]
employees to do so like 3500 a piece but
[3:05:49]
that didn't make it to the final
[3:05:58]
Is there a reason that certain
[3:05:59]
departments aren't
[3:06:02]
considered?
[3:06:03]
>> I think most department heads that
[3:06:05]
receive it are commissioners for the
[3:06:08]
most part. I mean the ones that have
[3:06:10]
been on call like uh for example um the
[3:06:16]
IT department
[3:06:18]
reaching out emails and they always you
[3:06:22]
know I can reach out to him any point in
[3:06:24]
time I mean answer calls email
[3:06:29]
>> so it's all before call essentially
[3:06:34]
>> yes
[3:06:37]
really emergency.
[3:06:46]
» Yeah. So, I thought that we had um
[3:06:49]
maybe I should just go back and look. I
[3:06:50]
thought we had one a
[3:06:57]
check.
[3:07:04]
There it is.
[3:07:13]
I can't find but I thought that I the position I'm thinking about would
[3:07:19]
not be calling people in over time. Let
[3:07:21]
me go through my back.
[3:07:29]
» Just a comment. Conceivably, if the
[3:07:31]
principal planner position isn't hired
[3:07:32]
right away, could a substantial portion
[3:07:37]
of that be moved
[3:07:39]
to a line which would be over time.
[3:07:48]
It depends how we I mean they could
[3:07:51]
potentially use some of that money um
[3:07:54]
the data bring or depending that develop
[3:08:05]
» so I guess this is a little bit more
[3:08:07]
clarification
[3:08:10]
asking right now that position isn't
[3:08:12]
filled without that position being
[3:08:14]
filled how does that impact other people
[3:08:16]
within your department
[3:08:18]
Well, right now I'm on the principal
[3:08:20]
planner,
[3:08:23]
» but we we have an we have an amazing
[3:08:25]
team. It does um add to the workload of
[3:08:29]
my planner one and my assistant planner,
[3:08:31]
which both have stepped up um to do
[3:08:34]
additional things as we transition with
[3:08:35]
the law school. But right now, I'm I am
[3:08:39]
the decision maker. Not that I wasn't
[3:08:41]
before, but I had a an in between
[3:08:43]
management staff, but I'm the decision
[3:08:45]
maker. more hands-on approach now.
[3:08:49]
Go ahead.
[3:08:50]
>> Um, in hiring the um, new principal
[3:08:53]
planner, would you have to bring that
[3:08:55]
person in at this salary or is that just
[3:08:58]
because of um, you know, that person was
[3:09:01]
there for so long? And
[3:09:03]
>> yeah, I I don't know. I guess that
[3:09:06]
depends on that depends on the level of
[3:09:08]
experience. If we have somebody that has
[3:09:10]
25 years experience that we bringing on,
[3:09:12]
I think that would be equivalent to what
[3:09:14]
we lost.
[3:09:16]
in our previous planner.
[3:09:17]
>> Okie dokie.
[3:09:21]
» The these are technical position and
[3:09:24]
>> it's hard to get them fill.
[3:09:26]
>> Yes.
[3:09:28]
>> I'm speaking on a private sector
[3:09:32]
position.
[3:09:34]
Any other questions for this section?
[3:09:37]
Anything else you like to highlight to
[3:09:39]
us?
[3:09:42]
And you know these historic
[3:09:48]
» I actually proposed that based on what
[3:09:51]
we spent last year. So in there it's
[3:09:53]
like our arborist um our consultant for
[3:09:56]
the tree program. So I made that
[3:09:58]
decision to drop it because the reality
[3:10:00]
is we didn't we didn't need that much
[3:10:02]
money.
[3:10:06]
» Okay. So we move to page uh
[3:10:10]
62 community development commission
[3:10:15]
[Music]
[3:10:17]
>> sir.
[3:10:19]
>> So again this is another this training
[3:10:22]
line
[3:10:23]
>> where that went down to 1,000. I just
[3:10:26]
want to reiterate that this is training
[3:10:28]
that has to be offered to the planners
[3:10:30]
and all three of the commissioners. So,
[3:10:33]
$1,000 isn't is not going to to cut it.
[3:10:37]
We have to be able it is written. We
[3:10:39]
have to be able to offer that training.
[3:10:41]
And if I want to continue to have best
[3:10:42]
in class as far as planners, especially
[3:10:44]
with the losing somebody that's been in
[3:10:47]
this role for $25, I need to
[3:10:56]
» I need to be able to offer them training
[3:10:59]
if if I want the best in class. I mean,
[3:11:01]
they they need an opportunity to go to
[3:11:03]
training. And that also that line covers
[3:11:06]
when city council goes to the planning
[3:11:09]
conference that usually happens every
[3:11:11]
year when we offer it to you for those
[3:11:14]
who do attend in Saratoga because my
[3:11:17]
department offers it to you every year.
[3:11:21]
>> Yes.
[3:11:22]
Um but $1,000 is not enough.
[3:11:27]
>> So I I just have a question.
[3:11:29]
>> Yes.
[3:11:30]
Oh, I just had a question. So, this is
[3:11:32]
your proposed budget, right? So, the 500
[3:11:35]
um for overtime. Why didn't we put a,000
[3:11:38]
in?
[3:11:38]
>> I did put 1,000. This isn't my proposed
[3:11:41]
budget did not make it. This is the
[3:11:42]
final budget. Okay.
[3:11:44]
>> So, that's those are the things that
[3:11:45]
some things got cut and I'm fine with,
[3:11:47]
but I'm highlighting the things that
[3:11:50]
it's beneficial that it stays.
[3:11:53]
>> Okay.
[3:11:55]
Miss uh Patrick and you had do you have
[3:11:59]
it now or
[3:12:00]
>> I don't think so.
[3:12:01]
>> Oh, I was just gonna ask if the when you
[3:12:03]
said that they have to have the
[3:12:05]
training, are they mandatory training
[3:12:06]
>> for the commissioners? Yes.
[3:12:08]
>> Oh, okay.
[3:12:08]
>> Yes, they are.
[3:12:10]
>> Go ahead, please. So, I just wanted to point out the fact that you took out
[3:12:14]
15,000 on your um visa services
[3:12:18]
>> and you're just asking us to restore the
[3:12:21]
mandatory training back another 1500.
[3:12:25]
>> Yes.
[3:12:25]
>> And the overall
[3:12:26]
>> 3,000
[3:12:28]
that I asked for 3,000 in that line.
[3:12:31]
>> You're asking for 3,000. Okay.
[3:12:33]
>> Mhm.
[3:12:34]
>> 231,000.
[3:12:36]
>> And you want you you're asking for the
[3:12:38]
overtime to be back up to a,000. Yes.
[3:12:41]
Okay.
[3:12:43]
All right. Thank you.
[3:12:47]
» Any other questions?
[3:12:51]
>> Okay. Sorry.
[3:12:58]
[Music]
[3:13:07]
» You can't without a statement.
[3:13:11]
community development increased by like
[3:13:13]
a 62% uh approximately $3,000 increase.
[3:13:19]
>> Okay.
[3:13:22]
>> All position on all positions except for
[3:13:24]
the new senior assistant position is
[3:13:27]
full. I'm happy to report that.
[3:13:29]
>> Um this year we operated with very short
[3:13:34]
staff in the community development. We
[3:13:36]
filled Sylvia's position which was
[3:13:38]
empty, a year and a half for program
[3:13:41]
monitor
[3:13:42]
>> and we had 6 months without a program
[3:13:45]
accounts clerk. Uh so I'm happy to say
[3:13:48]
that those are those two positions are
[3:13:50]
full. The CD assistant position is in
[3:13:54]
full because there's a portion that got
[3:13:56]
missed with civil service that Katie is
[3:13:59]
working on. It was something um
[3:14:04]
the correct verbage but why I can't hire
[3:14:07]
when I went to go hire somebody and it
[3:14:09]
hadn't gone through the full process
[3:14:11]
with the county
[3:14:12]
>> and which position of that
[3:14:14]
>> um see the assistant
[3:14:19]
>> new it was there when I got here in the
[3:14:22]
budget
[3:14:26]
» go ahead
[3:14:26]
>> was there a person in it when you got
[3:14:28]
here
[3:14:28]
>> no it was a new position that I was
[3:14:30]
looking to fill that my predecessor had
[3:14:32]
got approved for but there was something
[3:14:34]
on our that didn't happen.
[3:14:37]
>> I understand. Um but so in other words,
[3:14:39]
you've been able to operate without the
[3:14:41]
CD assistant
[3:14:42]
>> barely.
[3:14:43]
>> Okay.
[3:14:45]
>> Which is why we have a part-time we had
[3:14:47]
two part-time people consultants pretty
[3:14:50]
much hurting and helping us.
[3:14:52]
>> Thank you.
[3:14:54]
>> And are you saying that those people are
[3:14:56]
no longer there? two part time.
[3:14:58]
>> One part time is no longer part time.
[3:15:02]
>> Um I do have a further question about
[3:15:04]
the um under the line 88687 the program
[3:15:08]
account for I see that it went down is
[3:15:10]
that a new person in that position?
[3:15:12]
>> Yes, it is. Okay.
[3:15:15]
>> So going back to the the part was it was
[3:15:19]
this to help pick up the workload for
[3:15:22]
these position that was not filled. Is
[3:15:24]
that correct? But since you are in all
[3:15:27]
these position and fill up, would you be
[3:15:30]
uh downsizing in the parttime line?
[3:15:34]
>> Well, that is one person.
[3:15:38]
>> Well, there's somebody in it.
[3:15:39]
>> There's somebody in it. It used to be
[3:15:41]
two, but it's still that is one person.
[3:15:46]
>> Well, last year last year budget 54,000.
[3:15:50]
This year proposed 54.
[3:15:54]
this year proposal
[3:15:55]
>> 50,000 sorry last year 54
[3:15:59]
>> just let me
[3:16:02]
>> second sorry
[3:16:03]
>> no this was two 2025 is 254,000
[3:16:07]
for two part time
[3:16:10]
>> so and her hourly work at $20
[3:16:16]
at 20 hours a week is over that is 52
[3:16:20]
she makes $50 an
[3:16:26]
So, do you you still need a part-time
[3:16:28]
position?
[3:16:29]
>> Yes, that position
[3:16:32]
manages
[3:16:33]
a very important role. She that position
[3:16:36]
manages home.
[3:16:38]
>> So, our home projects
[3:16:46]
Anything
[3:16:52]
else?
[3:16:54]
Go ahead.
[3:16:55]
>> Community development equipment.
[3:16:58]
Nothing proposed for this year is
[3:17:00]
$4,000.
[3:17:01]
>> Yeah. Minimum most anything that we need
[3:17:04]
for community development is
[3:17:05]
reimburseable from CDBG. So it doesn't
[3:17:08]
impact our general funds. Thank you.
[3:17:12]
But that just mean you said most of it
[3:17:15]
is reimburseable through
[3:17:18]
how much how much money is reimburseable
[3:17:22]
coming out of your department through
[3:17:23]
like the
[3:17:25]
>> Well, we have each year we have our CDBG
[3:17:29]
own funds. So that's roughly 3.1 million
[3:17:32]
that's all reimburseable. So each year
[3:17:35]
is roughly in salaries from each one.
[3:17:38]
And I'm just thinking this might not be
[3:17:41]
all the way accurate, but 234,000
[3:17:46]
in salaries from CDBG I believe is on
[3:17:50]
our admin line. Um 100
[3:17:54]
maybe 100,000
[3:17:57]
for home.
[3:17:59]
So far the community development those
[3:18:02]
roles are still
[3:18:09]
might be good information to have
[3:18:13]
» I don't know those numbers on
[3:18:20]
you step up.
[3:18:22]
>> Would you like to follow up?
[3:18:24]
>> Yeah, I think I was just thinking we
[3:18:25]
might want to look at that.
[3:18:28]
You want to follow up with a question?
[3:18:30]
>> Yeah. Yeah. I was just I'll be there.
[3:18:32]
>> Just pick it up already. Just do it
[3:18:35]
right away.
[3:18:35]
>> I was just saying maybe we need to look
[3:18:37]
at like I'd like to see those numbers
[3:18:39]
that we're talking about. That's all as
[3:18:40]
>> reimburse. Can we make that please?
[3:18:43]
>> Yeah. Thank you.
[3:18:44]
>> Our annual action plan that we publish
[3:18:48]
each year. It'll list out what we put
[3:18:51]
towards adhesion.
[3:18:56]
So it is public information
[3:19:03]
» under this um section. You have $5,000
[3:19:06]
inside for timing.
[3:19:08]
>> Yes.
[3:19:11]
The same as that I asked for before. We
[3:19:14]
have CS
[3:19:16]
people there.
[3:19:19]
>> Any other questions?
[3:19:21]
>> Go ahead. But I mean that's only $5,000
[3:19:24]
not equipment but we haven't spent any
[3:19:26]
of it yet year to date.
[3:19:29]
We had
[3:19:32]
because the team is doing
[3:19:35]
you know they're coming in late staying
[3:19:37]
late they're they're flexing in the same
[3:19:40]
day. So if they know they have to be
[3:19:42]
here for a meeting they're coming there
[3:19:45]
later you know that which doesn't always
[3:19:48]
work cuz we got work to do. that doesn't
[3:19:50]
that's not always the the best option.
[3:19:58]
» So, how do you track these contents?
[3:20:02]
>> We have a time sheet that they put in
[3:20:05]
every day that they sign in every day.
[3:20:08]
>> That's right. Or just
[3:20:09]
>> No, it's manual.
[3:20:10]
>> So, you sign in when you come in, you
[3:20:13]
sign out when you go home.
[3:20:18]
» Okay. Are there any other questions? Are
[3:20:21]
there any other things you wanted to
[3:20:22]
highlight for us? What's happening in
[3:20:24]
the department?
[3:20:25]
>> Yes, this is some good things.
[3:20:27]
>> Yeah, there's been a lot of there's been
[3:20:29]
a lot of good things. Um, this year we
[3:20:32]
really focused on implementing all the
[3:20:34]
changes that we did in 2024 as far as
[3:20:37]
our processing procedures cuz I I could
[3:20:40]
remember coming to you saying we're
[3:20:41]
doing this, we're doing that. And this
[3:20:43]
year, um, the team really wanted to do
[3:20:45]
that to be efficient. Um, we've been
[3:20:48]
able, we're on track to expend almost
[3:20:51]
$2.8 million into the community to our
[3:20:55]
nonprofits, which is wonderful. We get
[3:20:58]
$3 something million. And this year, we
[3:21:01]
are on track. We've spent that money.
[3:21:03]
has been in the community.
[3:21:04]
Our community, severance are spending
[3:21:06]
them, spending those funds. So, those
[3:21:09]
likely that need it are getting the
[3:21:11]
services that they want. So, that's
[3:21:13]
something that I'm extremely proud of.
[3:21:15]
Yes, we have some stragglers, but that's
[3:21:18]
okay. Um, so we really focused on that.
[3:21:21]
Um, we I'm proud of the work that we did
[3:21:24]
with being short staff and community
[3:21:26]
development. We this year we focused a
[3:21:29]
lot of one-on-one technical assistance
[3:21:31]
with our subreient and that shows
[3:21:33]
they're able to spend the money. We're
[3:21:35]
not going to close out this year. When I
[3:21:37]
say this year, I'm talking about our
[3:21:39]
federal year for community development
[3:21:42]
which ended on 9:30. So, we're not going
[3:21:45]
to close out with as much money still on
[3:21:48]
the table as we have in previous um
[3:21:52]
>> previous years, but we we are working.
[3:21:55]
Um and it's an exciting time for my
[3:21:57]
department considering we're almost
[3:21:59]
fully staffed.
[3:22:01]
We closed out phase one of our
[3:22:04]
comprehensive plan for anyone who went
[3:22:06]
to our last community meeting. So, we've
[3:22:08]
heard a lot of feedback over the last 12
[3:22:11]
months from the neighborhoods and we've
[3:22:13]
been able to aggregate that data to
[3:22:15]
really push out what our overall vision,
[3:22:18]
the goal is for this city. So, we're
[3:22:21]
looking forward um to phase two and I
[3:22:24]
think that right there with the spending
[3:22:25]
and the comp plan is the priorities of
[3:22:27]
the department. We've been able to
[3:22:29]
strengthen all of our relationships with
[3:22:31]
our stakeholders working closely with
[3:22:33]
Metrolex and the other developers in the
[3:22:35]
city. We're making sure that we are
[3:22:37]
giving the support and they're giving us
[3:22:39]
support that we need to push some of
[3:22:41]
these projects through and some of those
[3:22:42]
projects would be our YWCA
[3:22:45]
um project or scap the scap project
[3:22:48]
that's happening. Um so just just really
[3:22:51]
proud of the the the overall work of my
[3:22:53]
team. Could you talk about the lead
[3:22:56]
program?
[3:22:56]
>> The lead program. October 1st, we fully
[3:23:00]
transitioned our county lead program.
[3:23:02]
Um, and we've already made significant
[3:23:05]
changes. We've already um identified
[3:23:08]
some weaknesses in the program and again
[3:23:10]
addressing the policies and procedures
[3:23:12]
and making sure that we can get this
[3:23:15]
information out to the people. Um, so
[3:23:17]
we've rebranded it. um logos, flyers.
[3:23:22]
We have some projects that are in line
[3:23:24]
that we'll be using. Some of our CDBG
[3:23:26]
dollars for one of them is to get a lead
[3:23:29]
hazard children safety van. It's an
[3:23:31]
outreach van. We hope we're we're still
[3:23:34]
flushing this out, but our hope is to
[3:23:36]
partner with our local hospital, have
[3:23:38]
nurses on the band going into the
[3:23:40]
communities doing lead testing. Um go so
[3:23:44]
in an effort to meet people where they
[3:23:45]
are. Sometimes people don't want to come
[3:23:48]
and sign up for programs and landlords
[3:23:50]
can't get all of the information from
[3:23:51]
tenants to actually take advantage of
[3:23:54]
this program. So we we have that going
[3:23:56]
on too and we're excited about that.
[3:23:58]
>> So are you going to are you going to do
[3:24:00]
some outreach to neighborhood
[3:24:01]
association to kind of have people
[3:24:03]
buying into this program?
[3:24:04]
>> Yes. And I'm glad that you said
[3:24:06]
outreach. I have something that's an act
[3:24:08]
of the council. We talk about in our
[3:24:11]
these neighborhood meetings. A lot of
[3:24:13]
times neighborhoods and and community
[3:24:16]
members are saying we don't we don't
[3:24:17]
know that this is available. I'm leaning
[3:24:20]
on council to share this information
[3:24:22]
with your constituents. The city cannot
[3:24:24]
do it without you. We're putting it in
[3:24:26]
paper. We're sharing it on social media.
[3:24:29]
We we need the council to share the
[3:24:31]
information with the constituents. It is
[3:24:34]
very disappointing when you have people
[3:24:36]
in the community that say, "We don't
[3:24:37]
know this fund exists or we don't know
[3:24:39]
that it applies when we all have
[3:24:40]
representation right here on the
[3:24:42]
council." So, I'm going to be leaning on
[3:24:43]
it
[3:24:45]
>> this year to really push this
[3:24:46]
information out there to the people that that you serve. So, yes, we will be
[3:24:52]
doing that.
[3:24:52]
>> We have the funding there, so we just
[3:24:54]
need to help you your
[3:24:58]
>> to get that information out so people
[3:24:59]
can tap into the funding. The other
[3:25:02]
question I want to ask in terms of um
[3:25:04]
working with the BCNI
[3:25:07]
uh habitat humanity in terms of spending
[3:25:09]
all the allocation that we provide to
[3:25:11]
them every year. How is that
[3:25:13]
relationship working with them to make
[3:25:16]
sure they utilize all the allocation on
[3:25:18]
a timely basis?
[3:25:20]
>> We are giving technical assistance. Um
[3:25:24]
just because you get technical
[3:25:25]
assistance doesn't mean that we follow
[3:25:27]
the technical assistance and spend the
[3:25:29]
money down. But the city is doing their
[3:25:31]
part. Community development is doing
[3:25:33]
their part. We have been meeting
[3:25:35]
one-on-one. We recently started
[3:25:37]
coordination meetings with BCNIR. So to
[3:25:39]
ensure that they have to support the
[3:25:41]
move to project, we have a meeting if
[3:25:43]
they bring something up and to bring in
[3:25:45]
with the department heads to sit in that
[3:25:47]
meeting to help them, they have that
[3:25:49]
option to do that. So that's new. We
[3:25:51]
recently started out. We've met with one
[3:25:54]
with every sub. So,
[3:26:01]
» so I'd just like to circle back to the
[3:26:02]
ban that you talked about because that
[3:26:03]
really sounds like a good thing to be on
[3:26:05]
the community. So, you're currently how
[3:26:08]
are you what was the funding source?
[3:26:09]
CDBG.
[3:26:10]
>> CDBG. So, that's not something we would
[3:26:12]
have to look at for capital.
[3:26:14]
>> Okay. You would just purchase it and all
[3:26:17]
that money would come from CDBG. And um
[3:26:19]
do you have a anticipation on when that
[3:26:22]
happen? I don't you know I had put it in
[3:26:24]
for a capital project but after talking
[3:26:27]
um to the commissioners like it is a it
[3:26:29]
is a nigible expense for CDBG. So let's
[3:26:31]
shift considering we already have a desk
[3:26:34]
deficit because I don't know how China
[3:26:36]
been trying to get a ban.
[3:26:41]
» So Miss Car's earlier point um multiple
[3:26:44]
times brought the fact of what we can
[3:26:46]
do. I've spoken with communication seen
[3:26:48]
with our school district when we have
[3:26:50]
things like this program that you know
[3:26:53]
the school district has a large reach
[3:26:54]
and has a lot of ways to communicate
[3:26:57]
with families. Um always willing to do
[3:27:00]
that. All we have to do is just send it
[3:27:01]
over saying this is the information put
[3:27:03]
it on their all their electrical
[3:27:07]
electronic uh interfaces if you will. Um
[3:27:09]
and I'm sure if we were to do our own
[3:27:12]
printing that they would you know be
[3:27:14]
willing to distribute it that way as
[3:27:15]
well. So again, it's just a resource
[3:27:17]
that we should just not do. The approval
[3:27:21]
from Dr. Co has already been into to
[3:27:23]
help things
[3:27:24]
>> and they they have actually with the
[3:27:26]
comprehensive plan and winning every
[3:27:28]
kids from bad neighborhood meetings in
[3:27:29]
our schools put on social media. So that
[3:27:32]
part we have strengthened that
[3:27:34]
partnership and we have utilized them as
[3:27:36]
a re as a resource already.
[3:27:39]
>> Go ahead. Um, I just want to ask in
[3:27:42]
terms of the CDBG SNAP neighborhood
[3:27:44]
revitalization uh money which um it's zero for 2026. Is that because did
[3:27:51]
it shift to another one of these lines
[3:27:53]
or is it that just that we got a cut
[3:27:55]
from the federal government?
[3:27:56]
>> No, it's not a fun. The SNAP program
[3:27:59]
hasn't expended money from that line in
[3:28:01]
three years. So, we took that money and
[3:28:04]
put it in the development line so that
[3:28:06]
we can have more control over
[3:28:10]
people contracting going out and leaving
[3:28:12]
city on properties. We've met with the
[3:28:16]
team downstairs and they have a capacity
[3:28:19]
issue.
[3:28:22]
So, in an effort to address and getting
[3:28:24]
these homes stressing with our homes
[3:28:25]
initiative, getting these homes cleaned
[3:28:27]
up, making sure that they're safe to
[3:28:29]
enter for our realtors, we took that and
[3:28:31]
made it a put it on a development line.
[3:28:34]
>> Okay. And then um my other question
[3:28:38]
was oh um so speaking of homes um so
[3:28:44]
we've put into the budget um trying to
[3:28:48]
uh bring in 4.5 million.
[3:28:51]
>> Uh to date we've brought in um 1.5
[3:28:55]
million um with only a few months left.
[3:28:58]
And I was just wondering um you know
[3:29:00]
what
[3:29:02]
how we're going to try to achieve
[3:29:05]
>> other
[3:29:06]
money is from the Skinnct 40 project
[3:29:09]
which is held under litigation right
[3:29:10]
now. So that transferred over from last
[3:29:12]
year to this year.
[3:29:14]
>> So it's not direct sales of cityowned
[3:29:16]
property like what we talk about in
[3:29:18]
property management committee. That's
[3:29:20]
not what that revenue was that city
[3:29:23]
>> city own property work on. The other one
[3:29:25]
is said $500,000
[3:29:27]
sale town
[3:29:29]
>> and driving put in a moratorum which
[3:29:32]
they have now lifted but potential for
[3:29:37]
there's going to be a solar site there.
[3:29:39]
>> Yes.
[3:29:40]
>> So there's a couple of big
[3:29:45]
uh transactions out there that would
[3:29:48]
bring that number up. Is it still going
[3:29:50]
to happen in 25?
[3:29:53]
I hope so, but I can't guarantee it. It
[3:29:56]
more
[3:29:58]
going to 26. So, have a little bit of
[3:30:02]
deficit here. Show up the numbers for
[3:30:04]
26.
[3:30:05]
>> Okay. Thank you.
[3:30:08]
>> Talking about I mean we are currently um
[3:30:12]
property management is reaching this
[3:30:13]
meeting once per month. Is there any
[3:30:16]
consideration to kind of put that back
[3:30:18]
two times per month so that we can be be
[3:30:22]
more aggressive to achieve u a better
[3:30:26]
number
[3:30:27]
>> into next year?
[3:30:27]
>> We need that more than happy to shift
[3:30:29]
the staff to do that.
[3:30:32]
>> But you think in my opinion I don't
[3:30:34]
think someone is going to make it more
[3:30:37]
>> I'm looking at in terms of the law
[3:30:40]
department in terms of having the the
[3:30:41]
approval the closing you know all those
[3:30:44]
things.
[3:30:45]
because it kind of it kind of dragged
[3:30:47]
out like meeting once a month and how do
[3:30:51]
we approve it once a month? I think also
[3:30:53]
we're looking at the the closing and
[3:30:55]
it's kind of spread out.
[3:30:56]
>> I I this is just me advocating for my
[3:31:00]
work that Maurice puts into this process
[3:31:02]
and the time that it takes to get all
[3:31:05]
these things together, the sim takes to
[3:31:07]
collect all the supporting documents and
[3:31:09]
put that analysis together for the PMC.
[3:31:12]
I think that it helps him to be come to
[3:31:15]
you the more complete right versus him
[3:31:18]
coming to you and then having to say
[3:31:21]
this still you know x y and z you know
[3:31:27]
do documents but whatever you decide we
[3:31:31]
will my team will make that we'll make
[3:31:33]
that adjustment but I don't think you've
[3:31:36]
given it a chance we've only been
[3:31:37]
meeting a couple of months once a month
[3:31:40]
>> so we really
[3:31:44]
It feels like we meet more than once a
[3:31:45]
month, but I guess
[3:31:47]
>> it is a that's fairly new. So,
[3:31:52]
>> yeah, I'm kind of looking at it now
[3:31:55]
standpoint in terms of moving more
[3:31:57]
aggressively towards closing so that we
[3:31:59]
can achieve the numbers.
[3:32:03]
>> Any other question? I mean you touched
[3:32:04]
on your department but you did not touch
[3:32:06]
on and you you and your staff spend
[3:32:09]
significant I would say significant
[3:32:12]
amount of time and energy all of the
[3:32:14]
above to achieve those um result in
[3:32:17]
terms of allocation in terms of tracking
[3:32:20]
I will give you the opportunity to
[3:32:21]
please highlight the good things and we
[3:32:24]
start the bad things or just the good
[3:32:26]
things just the good things okay we are
[3:32:28]
at
[3:32:30]
>> about 85% %
[3:32:34]
spend down when when I think of our now
[3:32:38]
the couple that are still need to spend
[3:32:41]
our large amounts
[3:32:43]
but most of them are with the exception
[3:32:47]
of a couple we we know where they are.
[3:32:49]
major development projects, but
[3:32:51]
the rest of them, you know, 30,000,
[3:32:54]
40,000, they're not even able to spend,
[3:32:56]
you know, you still got till next year
[3:32:58]
to spend them. So, um, Mitch has done a
[3:33:02]
tremendous, tremendous, tremendous job
[3:33:06]
working with the subreients and making
[3:33:09]
sure that the city is aligned with our
[3:33:11]
environmental review. That had become a
[3:33:14]
issue. the US how we would typically do
[3:33:17]
an environment to review the US trend
[3:33:19]
requires something different and my team
[3:33:22]
has really stepped up and made sure that
[3:33:24]
our sub recipients are are compliant
[3:33:31]
since you mentioned ARPA I think the
[3:33:32]
allocations as was presented by the
[3:33:34]
council is often coming under vir
[3:33:37]
scrutiny similar to the CDB CDBG funding
[3:33:41]
is there any way to quantify its
[3:33:43]
community impact
[3:33:46]
Well, we do we we collect the data so we
[3:33:50]
do know how many people to serve, where
[3:33:52]
those people live, what are the ages. So
[3:33:54]
there's there isn't a gap as far as
[3:33:58]
reporting. I will share that information
[3:34:01]
>> with respect to
[3:34:03]
>> we we collect the same information. We
[3:34:05]
get report we we get quarterly reports
[3:34:08]
from every sub. I think that would be
[3:34:10]
valuable to substantiate
[3:34:13]
the reason why I individually and others
[3:34:15]
voted in favor of that certain
[3:34:17]
allocations. Certainly there are some,
[3:34:19]
you know, in full transparency, there
[3:34:21]
are some subreients that are struggling.
[3:34:24]
Um, they are struggling. Some of them
[3:34:26]
don't have the capacity for the amount
[3:34:28]
of money that was allocated to them. And
[3:34:30]
we we're we're seeing that even though
[3:34:33]
we're supporting them and trying to give
[3:34:34]
that technical assistance to them,
[3:34:37]
they're struggling. And I'm just being honest.
[3:34:41]
>> Still,
[3:34:42]
>> yeah, there's still time, but
[3:34:44]
>> but time is of the essence. And the ones
[3:34:47]
that are struggling, do you in your own
[3:34:50]
professional capacity, do you feel that
[3:34:51]
they're going to achieve it at the end
[3:34:53]
of their own?
[3:34:54]
>> There are there are two that I need to
[3:34:57]
speak with commission about that we have
[3:35:01]
um major concerns.
[3:35:04]
So, on that note, um again, just because
[3:35:07]
we're struggling to try to figure out
[3:35:08]
how we're going to bring back some money
[3:35:10]
and be able to try to reduce a tax, um
[3:35:13]
is any of that money money that might be
[3:35:15]
able to be reallocated to other projects
[3:35:18]
like for example youth services?
[3:35:21]
>> I wouldn't see why not.
[3:35:22]
>> We just would have to do it within we'd
[3:35:24]
have to um reallocate it before
[3:35:27]
December.
[3:35:28]
>> And I don't think you can reallocate it
[3:35:31]
this time.
[3:35:32]
>> Well, that's what I was wondering. Okay.
[3:35:33]
Yeah. So, we can't
[3:35:35]
>> how would we, in other words, if there
[3:35:37]
were I'm making this up, but if XYZ
[3:35:39]
organization
[3:35:41]
wasn't able to spend the money that we
[3:35:44]
allocated to them, we just lose it.
[3:35:46]
>> I wouldn't say that we lose it. I think
[3:35:48]
there may be some creative ways if we
[3:35:51]
use the money for the same intention,
[3:35:54]
but maybe not.
[3:35:58]
>> That might be a place to be able to have
[3:36:00]
some money for youth services.
[3:36:02]
If the project was youth services, but
[3:36:04]
the two projects are not youth services.
[3:36:06]
So that
[3:36:09]
just
[3:36:10]
>> so it has to be like it has to be in.
[3:36:12]
>> Gotcha. Gotcha. We got serve money golf
[3:36:16]
course.
[3:36:16]
>> I did hear
[3:36:19]
>> you were trying to get some money
[3:36:20]
services somewhere in your department.
[3:36:24]
>> Not fine with us. there's an opportunity
[3:36:27]
to woman that um we possibly could use
[3:36:30]
right now we're closing out our federal
[3:36:33]
year so there will be some money that
[3:36:35]
hasn't been spent
[3:36:37]
>> and there may be some money that could
[3:36:39]
be allocated
[3:36:41]
>> thank you may
[3:36:45]
» going back to the our those two agency
[3:36:49]
that are struggling is there any way you
[3:36:52]
can share that information more in depth
[3:36:53]
information so the council
[3:36:55]
and we can able to see where we stand in
[3:36:58]
terms of that and if we need to make
[3:36:59]
adjustment or do anything outside of
[3:37:02]
that so that we don't lose that money or
[3:37:05]
we need to ramp up effort to help them
[3:37:09]
to you know be more aggressive if that's
[3:37:12]
something that you can you can we can
[3:37:14]
get on board to help you with
[3:37:16]
>> so Mr.
[3:37:18]
Miss is part of I have spoken. So she
[3:37:19]
plans on um bringing that forward to
[3:37:22]
>> I will respectfully I'm going to make
[3:37:24]
sure that I connect with commissioner
[3:37:26]
first.
[3:37:27]
>> Okay.
[3:37:27]
>> And then I will
[3:37:30]
>> yeah
[3:37:33]
those are information that is will be uh
[3:37:35]
beneficial to us to you for us to help
[3:37:39]
you if we can because uh we here to see
[3:37:41]
the money just disappear. and we can be
[3:37:44]
allocated to something that kind of fits
[3:37:47]
the need
[3:37:50]
project. We can
[3:37:54]
any other question I had to put you I
[3:37:57]
put you on the spot but I want to
[3:37:59]
highlight you know you had so many so
[3:38:01]
much of additional work
[3:38:03]
>> Mhm. with the allocation and the
[3:38:06]
tracking every single time and
[3:38:07]
constantly meeting with us almost every
[3:38:09]
week, every two weeks to highlight us,
[3:38:12]
to give us update, things like that. And
[3:38:14]
I do really appreciate that. I'm sure my
[3:38:16]
colleagues do appreciate that.
[3:38:18]
Absolutely. It's a lot of work, a lot of
[3:38:19]
effort, a lot of funding, making sure
[3:38:22]
that you be on top of all that, you
[3:38:24]
know, that 52 point something million
[3:38:27]
dollars.
[3:38:28]
>> So, thank you.
[3:38:30]
>> Thank you. I appreciate that.
[3:38:33]
Yeah,
[3:38:35]
you did it out of tight end.
[3:38:36]
>> Thank Thank you for your support.
[3:38:38]
>> Are there any other questions
[3:38:41]
>> from
[3:38:43]
saying no? Thank you and thank you for
[3:38:45]
what you are doing. Keep up the good
[3:38:47]
work.
[3:38:47]
>> Thanks so much.
[3:38:50]
>> All right.
[3:38:53]
So, we have come to the end.
[3:39:01]
a lot. Did you did they review your
[3:39:03]
department?
[3:39:04]
>> Yeah.
[3:39:05]
>> The other night.
[3:39:07]
>> So, um
[3:39:11]
we've come to the end of the review. Um
[3:39:14]
we'll just don't I know there's a lot of
[3:39:17]
questions we um pushed around. Are you
[3:39:21]
getting answer to all the questions? If
[3:39:23]
you're not, please reach out. copy, copy
[3:39:26]
them in, copy direct and we will um make
[3:39:31]
sure that you receive answers of any
[3:39:35]
question that Amazon started.
[3:39:39]
Please, if you're sending email, just
[3:39:41]
pick up the phone and call because
[3:39:42]
sometimes the email get disappear, you
[3:39:44]
know, pick up the phone and call and try
[3:39:47]
to get your questions answered.
[3:39:50]
>> Our next meeting is u this Friday 5:30.
[3:39:53]
Um more than likely um I will ask you to
[3:39:56]
clear out your calendar in next week.
[3:39:59]
>> I would like to add another day more as
[3:40:02]
reserve.
[3:40:03]
>> So I will do that this Friday. So I ask
[3:40:05]
you to look at your calendar please. Can
[3:40:07]
we tell you now what you know in case
[3:40:09]
there is if anybody has
[3:40:11]
>> you can yes but I will give you more
[3:40:13]
time you know in your capacity private
[3:40:15]
capacity to do it
[3:40:16]
>> Tuesday if you can you can um let me
[3:40:18]
know
[3:40:20]
>> um Miss Michael I will have to put out
[3:40:24]
public notice and it's a moral place so
[3:40:27]
that you know we we're here to be
[3:40:29]
serious in terms of as we get to the
[3:40:32]
final conclusion I would make myself
[3:40:34]
available
[3:40:36]
uh um have a meaningful dialogue, a
[3:40:40]
meaningful opportunity to be flexible uh
[3:40:42]
to achieve their budget hopefully before
[3:40:46]
the end of next weekend.
[3:40:48]
>> So, um I just be clear, we're still
[3:40:50]
meeting on Monday after meeting.
[3:40:53]
>> We're still but I just want to, you
[3:40:54]
know, put that place in case we cannot
[3:40:58]
conclude by Monday evening.
[3:41:01]
>> I have three nights next week that I
[3:41:03]
could add in.
[3:41:05]
>> Go ahead, please. Then I have a couple
[3:41:06]
questions. So um and these are
[3:41:08]
colleagues um for commissioner. So just
[3:41:11]
if you um could just when we get ready
[3:41:13]
to when we start the deliberation just
[3:41:16]
explain the council work from that um
[3:41:18]
fund um balance policy is and also um
[3:41:24]
what it would mean in terms of um going
[3:41:27]
past that what that entails. So if those
[3:41:30]
are two things that that you can address
[3:41:33]
deliberations on Friday.
[3:41:36]
>> Are those questions or are you in terms
[3:41:39]
of presentation on that?
[3:41:41]
>> Well, you can answer the question. I
[3:41:42]
mean if you want it's up to him how he
[3:41:44]
does it with the presentation but we
[3:41:46]
what our fund balance policy is um and
[3:41:50]
also what it entails in terms of talking
[3:41:53]
about
[3:41:55]
seeing a tax. No, I want to make sure
[3:41:57]
the video going to be captured whatever
[3:41:58]
you're you're asking. So, commissioner,
[3:42:01]
you make note of that, please.
[3:42:04]
So if you don't mind looking at your
[3:42:06]
calendar now or if not
[3:42:10]
it
[3:42:12]
we can put it just get it out there
[3:42:15]
so that we don't have to delay you know
[3:42:17]
getting you know
[3:42:28]
» I was just going to say a point of repi
[3:42:33]
appreciated when we had the
[3:42:34]
conversations around the housing task
[3:42:36]
force because I think it wasn't
[3:42:38]
suggested that we had everyone just
[3:42:40]
highlighted
[3:42:42]
and then we vote for alignment. Um I
[3:42:45]
think with having condensed meetings I
[3:42:49]
think if we're intentional we can
[3:42:50]
achieve our objective in two days or two
[3:42:53]
nights. Um I think the respectful ask
[3:42:56]
would be I think people come into Friday
[3:42:59]
with maybe a written or pre-provided
[3:43:01]
list to SAM. I think that would help us
[3:43:04]
align the areas of agreement and that
[3:43:06]
would make that discussion more um
[3:43:09]
productive. I don't know you have excuse
[3:43:11]
me they can be circular and I think we
[3:43:13]
all are mostly trying for like reasons
[3:43:16]
um by meeting to get away from us with
[3:43:19]
us just having so few on the books so
[3:43:21]
far.
[3:43:22]
>> Absolutely. So yeah so you know members
[3:43:25]
you can look at the revenue you know
[3:43:27]
come up with any suggestion please
[3:43:29]
document it so that we can go through
[3:43:31]
look at the expenditure lines and
[3:43:34]
departments and come up with your
[3:43:36]
suggestion for Friday and we can start
[3:43:39]
that discussion Friday
[3:43:41]
thank you for that Mr.
[3:43:44]
Yeah, cuz without
[3:43:47]
pads and
[3:43:50]
it's not easy. So, thank you. Thank you
[3:43:52]
for highlighting that. So, yes, please
[3:43:56]
sit down. You got some homework to do.
[3:43:58]
come up with your suggestion, come up
[3:44:00]
with some recommendation
[3:44:02]
and let's start
[3:44:05]
discussion across the board
[3:44:08]
and as I mentioned revenue and
[3:44:10]
expenditure time categories.
[3:44:14]
So do you want to give me your
[3:44:16]
availability in the next week and I can
[3:44:18]
able to do something thing or you just
[3:44:20]
want to sit on it for a day and get back
[3:44:22]
to me? That's fine.
[3:44:29]
What he says? No fighting.
[3:44:31]
>> Yeah.
[3:44:35]
» Okay.
[3:44:37]
>> So, Monday, Tuesday, Wednesday, and
[3:44:39]
Friday. I can do Well, Monday we're
[3:44:42]
already scheduled.
[3:44:43]
>> Yes. It's Tuesday, Wednesday, Friday.
[3:44:44]
You're available.
[3:44:45]
>> Mhm.
[3:44:45]
>> Why don't we just do like a doodle poll?
[3:44:48]
>> A doodle poll.
[3:44:51]
doodle or
[3:44:54]
>> well the point of the doodle post if
[3:44:56]
we're all saying it this day that but if
[3:44:59]
we fill it in then the it will let us
[3:45:02]
know where everyone's reading. So that's
[3:45:05]
the suggestion.
[3:45:07]
>> Yeah, just a matter of two days just to
[3:45:10]
one day cuz I I would like the reason
[3:45:13]
why we meet last Wednesday and this
[3:45:14]
Wednesday is because I wanted all
[3:45:16]
council members to be at the meeting. I
[3:45:19]
did not want to set the meeting with one
[3:45:20]
of us missing because we're only six of
[3:45:23]
us and it will not be beneficial because
[3:45:26]
we had we could have meet our leader but
[3:45:28]
there were one missing
[3:45:30]
>> and I don't feel that was too
[3:45:33]
>> so I ask for your support the next week
[3:45:36]
to sacrifice a day or two more.
[3:45:41]
All right. Anything else before
[3:45:44]
please and um commissioner if you have
[3:45:47]
any question please um provide the
[3:45:49]
answer to the uh to the members so that
[3:45:52]
way we're not waiting until um Friday. I
[3:45:55]
have a couple I will follow you.
[3:45:57]
>> Any emails sending emails with any
[3:45:59]
questions I did not answer.
[3:46:02]
So that's take care
[3:46:05]
>> and please if you're sending question
[3:46:06]
copy myself copy and copy Sam so that we
[3:46:10]
can able to track it because Sam does a
[3:46:12]
print out to make sure that we those
[3:46:15]
questions are being answered. If you
[3:46:16]
don't do that then we we can't track it.
[3:46:20]
>> All right. Anything else?
[3:46:24]
>> So I ask a motion to uh recess.
[3:46:27]
>> So moved second.
[3:46:28]
>> All in favor. Thank you so much. Good
[3:46:31]
night everyone. Thank you.