[0:32]
I will now call to order the July 27th,
[0:35]
2026 city of Abling, Kansas City
[0:36]
Commission meeting. Shayla, may we
[0:38]
please have a roll call.
[0:38]
>> Mayor Rin,
[0:39]
>> here.
[0:39]
>> Commissioner Taylor here.
[0:41]
>> Commissioner Kolhoff, present.
[0:42]
>> Commissioner Lidle,
[0:43]
>> yes.
[0:43]
>> Mr. Meisenberg,
[0:44]
>> here. Roll call's complete. Okay, if we
[0:46]
please stand for the pledge.
[0:50]
I pledge algiance to the flag of the
[0:52]
United States of America and to the
[0:55]
republic for which it stands nation
[0:59]
indivisible with liberty and all.
[1:08]
[clears throat]
[1:09]
>> All right. And our first item is the
[1:11]
approval of today's agenda.
[1:16]
I make a motion we approve as written.
[1:19]
>> A second.
[1:20]
>> Motion has been moved and seconded. Do
[1:22]
we have any commission discussion?
[1:26]
» Seeing none, we'll roll call vote. Vice
[1:27]
Mayor Taylor?
[1:28]
>> Yes.
[1:28]
>> Commissioner Koloff?
[1:30]
>> I.
[1:30]
>> Commissioner Lidle?
[1:31]
>> Yes.
[1:32]
>> Commissioner Meisenberg?
[1:33]
>> Yes.
[1:33]
>> Myself? Yes. Motion carries. Our next
[1:35]
item is the consent agenda which
[1:38]
consists of those multiple items in
[1:41]
there.
[1:43]
I'll make a motion we approve as
[1:46]
written.
[1:48]
>> I'll second.
[1:49]
>> Motion has been moved and seconded. Do
[1:51]
we have any commission discussion?
[1:55]
» Seeing none with a roll call vote.
[1:57]
Commissioner Koloff.
[2:00]
>> I.
[2:00]
>> Commissioner Lidle?
[2:01]
>> Yes.
[2:02]
>> Commissioner Meisenberg?
[2:03]
>> Yes.
[2:03]
>> Vice Mayor Taylor?
[2:04]
>> Yes.
[2:04]
>> Myself? Yes. Motion carries. Our next
[2:07]
item under heading six, public comments
[2:09]
communications is a public forum. If
[2:10]
there's anyone that would like to
[2:11]
address the commission on an item not on
[2:13]
our current agenda, they may do so at
[2:14]
this time.
[2:16]
If you could just state your name,
[2:18]
address, and there is a threeminute time
[2:19]
limit.
[2:23]
» Okay. My name is Cindy Peterson. Address
[2:25]
is 709 Northwest 11th Abene, Kansas. Um
[2:30]
we are going to put a map for you on the
[2:33]
property I am looking at. It says, "Good
[2:35]
afternoon, mayor and commissioners.
[2:37]
Thank you for the opportunity to speak
[2:38]
with you. I am requesting consideration
[2:40]
for the purchase of the cityowned lot at
[2:42]
800 North Vine. We currently own the
[2:44]
property immediately in the front of
[2:45]
that lot and acquire this parture would
[2:49]
allow us to improve and maintain the
[2:50]
property while creating opportunities
[2:52]
further development. Our plan is to
[2:54]
clean up the lot by removing the dead
[2:56]
trees and eliminating the poison ivy
[2:57]
that continues spread throughout the
[2:59]
property. We have opport obtained
[3:02]
estimates and expect these improvements
[3:04]
to cost approximately 15,000. We are
[3:07]
prepared to make the investment
[3:08]
ourselves because we believe property
[3:10]
has potential and would be an asset to
[3:13]
the neighborhood and properly
[3:14]
maintained. Looking ahead, we own the
[3:16]
property on the north and have discussed
[3:18]
the possibility of constructing a duplex
[3:20]
on the combined properties. The current
[3:22]
lot does not have significant frontage
[3:24]
in the development in the particular
[3:26]
manner on its own. By combining the two
[3:29]
partials, we would have adequate
[3:30]
frontage and a more functional building
[3:33]
site. We're still maintaining
[3:34]
appropriate space around the function
[3:36]
structure. I would ask the commissioners
[3:38]
to consider the economics of the
[3:40]
project. An estimated value of frontage
[3:42]
was that we own is about $6,200 and we
[3:46]
anticipate spreading about 15 just to
[3:48]
clean up the dead trees and the poison
[3:49]
ivy. That means an investment in the
[3:51]
property would be about 21,000 before
[3:53]
any future development takes place. In
[3:55]
addition, comparable usage lots areas
[3:58]
have land value on the south side of
[4:01]
19,900
[4:02]
on the north side and 910 north fine is
[4:06]
195. The cleanup cost and loan con
[4:08]
combined with the current estimate value
[4:10]
of the property would exceed those
[4:11]
values before any construction or
[4:13]
additional improvements are made. Giving
[4:15]
that significant upfront expense, we
[4:17]
would re respectfully request
[4:19]
consideration of a reduced purchase
[4:20]
price that recognize the current
[4:23]
condition of the property and
[4:24]
substantial investment requirements to
[4:26]
be made it usable. We believe this
[4:28]
purchase would benefit everyone
[4:30]
involved. The property would be cleaned
[4:31]
up, maintained by a private owner rather
[4:33]
than maintained an unutilized cityowned
[4:36]
lot. It has also returned the property
[4:39]
to a tax roles generate property tax
[4:41]
revenue for the city and other tax taxes
[4:44]
entitlements. In the future, any
[4:46]
residential federal in the property
[4:48]
would further increase its taxable value
[4:49]
and property additional long-term
[4:51]
revenue to the community. I thank you
[4:53]
for your time and consideration and I'd
[4:55]
be happy to answer any questions.
[4:57]
>> Thank you, Cindy. And I think uh inter
[4:59]
city manager, you said you guys have
[5:01]
already discussed this a little bit.
[5:04]
>> Yes, sir. City staff discussed the uh
[5:06]
potential future use by the city of that
[5:08]
parcel. Uh and we do not anticipate any
[5:11]
future use. It's landlocked. Uh so
[5:14]
there's nothing we can do with it. Um,
[5:17]
what we're looking for is I invited Miss
[5:19]
Peterson here to make their desire known
[5:22]
and if it's the uh consensus of the
[5:24]
commission, then staff will start to uh
[5:27]
work with her on a possible
[5:30]
um [clears throat]
[5:31]
offer and the whole process to sell the
[5:34]
lot.
[5:35]
>> Okay. What is the current policy on
[5:37]
selling city land? Uh
[5:39]
>> it's any real property transactions
[5:41]
require commission approval. That's it.
[5:46]
I'm all for it.
[5:47]
>> I'm too
[5:51]
good.
[5:51]
>> Thank you, Cindy.
[5:55]
[clears throat]
[5:59]
» Do we have anyone else uh in the
[6:01]
audience that would like to address the
[6:02]
commission on an item not on our current
[6:04]
agenda?
[6:07]
Okay, seeing none, we will move to item
[6:09]
6B, Abling Public Library 2027 budget
[6:12]
presentation. Dr. Molton.
[6:21]
» Hey. Um, I think I'm gonna pull up my
[6:23]
PowerPoint here. I just have a little I
[6:25]
didn't know how much information you all
[6:27]
wanted this year. It's been kind of
[6:28]
sporadic and different over the years.
[6:30]
So, um, I'm happy to listen to feedback,
[6:32]
too, of what all information you want
[6:34]
for future years from the library.
[6:37]
Um but I think um the manager Quinday
[6:41]
included the copy um we sent to him for
[6:43]
the library budget for 2027.
[6:47]
And a lot has been involved with the
[6:49]
library board and the finance committee
[6:51]
of the library board developing this
[6:54]
budget. Um but I'm just going to give
[6:56]
you a brief overview for that. Our
[6:59]
little mission statement here. Oh, I can change it myself.
[7:10]
Okay, just for a little mission
[7:12]
statement there.
[7:43]
we go. It said on but it wasn't.
[7:47]
Um there's a little overview about um
[7:49]
library tax um funds and li other
[7:52]
library funding. Um and you can see our
[7:56]
other sources of revenue there listed um
[7:58]
besides the tax levy. But uh for next
[8:01]
year our percentage is 89.8%
[8:05]
will be from tax revenue and 10.2 from
[8:08]
other funds like our endowment grants
[8:10]
and um any fees we charge here like for
[8:13]
copies and printing and faxing and
[8:16]
things like that.
[8:19]
A second
[8:30]
Um, and just uh some brief overviews of
[8:32]
what it went into putting together this
[8:34]
budget and changes from last year. Um,
[8:37]
like we used the same employee benefits
[8:39]
plan as the city. So the same increase
[8:42]
applies for our budget. Um, and this
[8:45]
year to kind of offset that, we decided
[8:49]
to cut benefits for our part-time
[8:51]
employees um that we will hire in the
[8:53]
future. So, we don't have to have that
[8:55]
budget cushion. Um, and the total for
[8:58]
the employee benefits is 2.45633
[9:02]
of the mills that the 8.22 mills that we
[9:04]
have. That much is just to cover the
[9:06]
employee benefits. Um,
[9:09]
and the budget has a 2% increase for
[9:13]
staff salaries. And as um, you know, we
[9:16]
did zero last year with you all. And
[9:20]
that total amount of money to get the 2%
[9:22]
is $8,674.
[9:26]
Um
[9:28]
the other line items, any increases are
[9:31]
for maintenance,
[9:33]
utilities, and then we're really trying
[9:36]
to u make sure we have all those
[9:39]
reoccurring expenses calculated
[9:41]
correctly for software, the phone,
[9:43]
internet, insurance, and we just got a
[9:46]
new copier. So, we're still trying to
[9:48]
figure out what the actual costs of
[9:49]
that's going to end up being. So, it
[9:51]
might go up or down. We're not sure yet.
[9:52]
We've only had it for we've only had one
[9:54]
bill so far. So, it's hard to calculate
[9:56]
what we should know more in a few
[9:57]
months, but just to make sure those are
[9:59]
all in there. And um pretty much every
[10:02]
line item is budgeted as like our actual
[10:05]
expenses that we anticipate. Um
[10:09]
and besides reducing the employee
[10:11]
benefits, we um supplemented with $8,000
[10:17]
from our endowment fund to keep the mill
[10:20]
levy at 8.22. and that required
[10:23]
eliminating um our Hoopla app that
[10:25]
patrons use for ebooks, audiobooks,
[10:28]
videos, music, and magazines. Um we'll
[10:31]
have to cancel that for 2027 um to get
[10:34]
to the 8.22 ms.
[10:45]
Wonder if the battery is dying.
[10:53]
And just a little bit more about the
[10:54]
budget. In 2025, we our cash balance in
[10:58]
our general fund was $24,458.
[11:01]
So that's what we have to carry over
[11:03]
into 2026.
[11:05]
Um and we didn't budget any in 2026 to
[11:09]
increase that at all. So,
[11:12]
um, and just a little overview of, um,
[11:16]
some of the budget issues that we're all
[11:19]
facing. The city faces the same thing
[11:21]
where if people don't pay pay their
[11:23]
property taxes, we don't collect that
[11:25]
money. So, we're anticipating to collect
[11:27]
that amount, but we don't. Um, and with
[11:30]
like limited other sources of income,
[11:32]
it's hard for us to make up that
[11:33]
difference. So these are the amounts of
[11:37]
um money we had anticipated for those
[11:40]
years that we didn't receive um because
[11:42]
people um didn't were delinquent in
[11:44]
their taxes. And then um the so it's
[11:48]
about 4.95%
[11:50]
just for property tax and if you offset
[11:52]
it with people who paid their past
[11:54]
delinquencies brings it down to 3.55%.
[11:58]
So for 2027, our projected shortfall
[12:01]
will be between those two numbers. And
[12:03]
so incorporated into the budget, we got
[12:05]
it to 17,800, which probably won't be
[12:08]
quite enough, but that's um what we were
[12:10]
able to get that number to. So we're
[12:13]
anticipating um not having that revenue.
[12:15]
So we budgeted that in this year.
[12:23]
And just some fun things I uh was
[12:26]
looking at some stats and for from
[12:29]
January to June of this year I compared
[12:32]
to last year and we have library visits
[12:35]
are up 15.5%.
[12:37]
So 15.5% more people are coming in here
[12:40]
than last year. Um circulation of
[12:42]
physical items is up 6.6% and the
[12:46]
digital circulation is up 16% over last
[12:48]
year. And so far this year, we've gotten
[12:51]
$55,000 in grants. Um, which of course
[12:54]
we can't spend for like operating
[12:55]
expenses or utilities, but for other
[12:58]
special projects that we're able to do
[13:00]
um since we got that grant money. So,
[13:06]
and that includes children's literacy.
[13:08]
Um this year adult literacy projects
[13:10]
will probably my training will start
[13:13]
this year but the projects will probably
[13:14]
start next year for adult um literacy
[13:17]
and computer literacy for adults. Um we
[13:21]
I think we all know like the age of AI
[13:22]
is kind of scary for especially our
[13:25]
older citizens uh even younger ones to
[13:27]
determine you know what's real and
[13:28]
what's not anymore. So, we're hoping to
[13:30]
focus on some digital digital literacy
[13:32]
skills next year and um also some
[13:38]
building projects.
[13:40]
Um some door automatic door openers for
[13:43]
our restrooms um because they're not the
[13:47]
doors are the the bathrooms are really
[13:49]
nice for um any person in a wheelchair,
[13:51]
but getting into them is hard cuz the
[13:53]
doors aren't don't have openers and
[13:55]
they're really heavy. So, we're hoping
[13:57]
to add those um with one of our grant
[13:58]
projects as well.
[14:01]
And I love my quote from uh President
[14:04]
Eisenhower. Don't be afraid to go to
[14:06]
your library and read every book. So,
[14:08]
take you a long time.
[14:11]
Um
[14:13]
and this is just um myself and my
[14:16]
assistant director, Cara. And those are
[14:18]
all our library board members currently.
[14:20]
if you all have any other questions um
[14:22]
for any of them at any time.
[14:25]
Like I said, I'm happy to answer
[14:26]
questions. If I don't know right now,
[14:27]
I'm happy to find the answer for you.
[14:29]
And um if you want specific things for
[14:32]
this kind of presentation in the future
[14:34]
years, just let me know. I'm happy to
[14:36]
put whatever information you're looking
[14:37]
for in there. So, do you have any
[14:39]
questions? Now,
[14:41]
>> you did have a reference to an attorney
[14:42]
general's opinion 2006-4.
[14:46]
Um that wasn't in our packet. Um, I just
[14:49]
kind of glanced at it and um, just
[14:51]
wanted maybe to make everyone else aware
[14:53]
of that attorney general's opinion,
[14:55]
specifically our city attorney. If we
[14:57]
are going to have a discussion later,
[14:58]
that might be um, that specific attorney
[15:01]
general opinion was a county um,
[15:05]
requesting funding, not a city. And, um,
[15:07]
there are some relevant differences
[15:09]
between the two. So, I just want to make
[15:10]
sure that we're aware. And you know,
[15:12]
frankly, from my perspective, as long as
[15:14]
you're within the mil levy budget that
[15:15]
the city has set, you can do whatever
[15:17]
you want. And so, um, I think if you are
[15:20]
needing funding beyond that, that's
[15:21]
where I think you really need to maybe
[15:23]
communicate early and often,
[15:25]
>> um, because that would require changing
[15:26]
that, I believe. I'm not sure about what
[15:29]
the attorney general thinks, but I think
[15:30]
we'll have to change that um, ordinance
[15:32]
if you're going to need funding beyond
[15:34]
that.
[15:34]
>> Yeah, like I said, the board got it down
[15:37]
to the 8.2 by cutting those few things
[15:39]
for next year. Um, but we'll have to
[15:41]
look at what that future holds next year
[15:43]
about what we can do then. So, and if I
[15:46]
think they're comfortable either way, if
[15:49]
they really feel like because we've
[15:50]
considered next steps would be cutting
[15:52]
hours um and cutting other services and
[15:56]
programs. So,
[15:58]
but we made it work for next year.
[16:07]
» Any further questions for Director Mold?
[16:10]
No, I appreciate your PowerPoint and
[16:13]
I've only heard good things about the
[16:14]
library. So, I say that every time, but
[16:16]
it's true. So,
[16:18]
>> well, we left our tables here. We have
[16:20]
Rodeo Queens coming to read to the kids
[16:22]
in the morning. So, we were trying to
[16:24]
get set up a little early. Uh last
[16:26]
Tuesday, Cinderella, we had about 108
[16:29]
people, I think. So, we're expecting a
[16:31]
We always have a big crowd for the rodeo
[16:33]
queens. So, um that's what these tables
[16:36]
are are here for. So
[16:39]
>> very excited about that.
[16:40]
>> Yeah,
[16:46]
» thank you.
[16:50]
» Might actually work now.
[17:04]
» Okay, moving on to heading seven,
[17:06]
unfinished business. First up is 7A,
[17:08]
consider approval of a Kansas Department
[17:09]
of Transportation airport grant
[17:11]
agreement. Interim city manager Quind
[17:13]
Day.
[17:14]
>> Thank you. Tonight, uh staff is asking
[17:16]
the commission to consider approving the
[17:19]
KOT airport grant agreement so that the
[17:22]
city can accept the state funding and
[17:24]
move forward with the T- hanger
[17:26]
replacement project. As you uh remember,
[17:29]
the commission has discussed this
[17:30]
project, the funding strategy, and the
[17:32]
replacement of the tornado damaged
[17:35]
hangers for more than a year. Tonight's
[17:37]
action is simply to approve the grant
[17:38]
agreement so those funds can become part
[17:41]
of the overall project financing. Uh
[17:44]
this grant, as you know, is just one
[17:46]
piece of the overall funding package. Uh
[17:48]
the project is funded through three
[17:50]
primary sources. the uh Federal Aviation
[17:53]
Administration, the KOT grant that's
[17:56]
before you, and then the city's required
[17:58]
local contribution.
[17:59]
Um the agreement establishes K DOT's
[18:03]
participation in the project. Under the
[18:05]
agreement, KOT will reimburse 50% of the
[18:07]
participating costs up to a maximum of
[18:10]
$333,700.
[18:12]
You'll see in your packet that the
[18:14]
estimate that we're going with is around
[18:16]
292,000.
[18:17]
Um but if those prices increase, we can
[18:20]
get up to 333.
[18:23]
The city's responsible for the remaining
[18:25]
participating cost once KOT's maximum uh
[18:27]
participation is reached. And we're also
[18:30]
responsible for any non-participating
[18:32]
cost. Um there's standard grant
[18:34]
provisions. They're outlined in article
[18:36]
two of the agreement. Uh that's on page
[18:38]
42 of your packet.
[18:41]
Uh, and also in your packet is an
[18:43]
updated funding plan which provides for
[18:45]
the overall financial picture of the
[18:47]
project. Current estimated project cost
[18:49]
is $1.65 million and combines federal,
[18:52]
state, and local funding over multiple
[18:54]
funding years. The FAA uh remains the
[18:57]
largest funding source, approximately
[18:59]
940,000.
[19:01]
ADOT providing funding uh we're
[19:04]
estimating 292,500
[19:07]
but up to 333,000.
[19:09]
and then the city's local share would be
[19:11]
uh the $292,000.
[19:14]
Um [clears throat] the agreement allows
[19:17]
the city to leverage significant federal
[19:18]
and state funding to replace that
[19:20]
infrastructure that was lost in the
[19:22]
tornado.
[19:23]
One question that's come up uh in the
[19:25]
year that I've been here is whether the
[19:27]
airport will construct six or eight
[19:29]
hangers. Commission has had a lot of
[19:31]
discussion the grant application and
[19:34]
then the agreement addresses that
[19:35]
directly. The project will be bid with a
[19:39]
sixth place T-hanger as the base bid,
[19:41]
eight place T- hanger as the alternate
[19:43]
bid, but the grant application uh was
[19:46]
written at the cost for the uh eight
[19:48]
hangers. So that way um if the engineers
[19:53]
are close on that cost, then we can do
[19:54]
the eight hangers if they come in
[19:56]
significant.
[20:00]
It is for uh replacing eight of those
[20:02]
hangers. So, our intent is to construct
[20:05]
the largest project completed with the
[20:07]
available funding. Um, that's on the
[20:10]
application on pages 56 and 63.
[20:14]
Um, the application also explains that
[20:17]
replacing the hangers helps the airport
[20:19]
maintain its minimum number of based
[20:21]
aircraft needed to preserve future FAA
[20:24]
entitlement funding. Um, it further
[20:26]
notes that there's currently 11 aircraft
[20:28]
on the hanger waiting list,
[20:30]
demonstrating that demand already exists
[20:32]
for additional hanger space. Replacing
[20:35]
the hangers not only restores the
[20:36]
infrastructure with loss, but also helps
[20:38]
protect the airport's long-term
[20:40]
eligibility uh for federal investment in
[20:43]
the future. So, we recommend that the
[20:46]
commission approve the grant agreement
[20:47]
and authorize the mayor and staff to
[20:49]
execute the related documents so that we
[20:52]
can accept the grant funding and
[20:54]
continue moving the project forward.
[21:01]
Any questions for staff on this one?
[21:04]
Um, your page numbers aren't lining up
[21:06]
with the online one here, so I'm having
[21:08]
trouble finding that, but you said that
[21:10]
there is no obligation to build an eight
[21:13]
place hanger with either this or the
[21:16]
federal grant.
[21:18]
>> Correct. Uh, the project is being bid
[21:21]
for six hangers uh and eight place or
[21:24]
eight hangers as an alternate bid. The
[21:26]
grant application was written at the uh
[21:29]
estimated cost for eight hangers.
[21:33]
And I guess that's exactly what you said
[21:34]
I think previously that I wanted to
[21:36]
clarify. So if the estimated cost was
[21:38]
for eight, that's there's not an
[21:39]
obligation to build eight. It's just we
[21:41]
might get less grant funds if we build
[21:44]
six.
[21:44]
>> Correct.
[21:45]
>> Thank you.
[21:45]
>> Yes. And this um approving this grant
[21:49]
agreement tonight does not obligate you
[21:50]
to six or eight. Uh that'll be when the
[21:52]
bids come in and uh you authorize the
[21:55]
construction contract.
[21:59]
» Yeah. Yeah. And that was the only thing
[22:00]
I had on there to note was I think our
[22:02]
stated preference is aid if we can make
[22:04]
it work.
[22:06]
>> That's how the funding was written in.
[22:12]
» Any further questions?
[22:25]
I'll make a motion to consider the
[22:28]
approval of a Kansas Department of
[22:30]
Transportation Airport Grant Agreement.
[22:33]
>> I'll second.
[22:34]
>> Motion has been moved and seconded. Do
[22:35]
we have any commission discussion?
[22:40]
Seeing none, I'm a roll call vote.
[22:41]
Commissioner Lidle,
[22:42]
>> yes.
[22:42]
>> Commissioner Meisenberg,
[22:43]
>> yes.
[22:43]
>> Vice Mayor Taylor,
[22:44]
>> yes.
[22:45]
>> Commissioner Kolhoff,
[22:45]
>> hi.
[22:46]
>> Myself, yes. Motion carries. Our next
[22:48]
item is 7B. Consider ground lease
[22:50]
agreement for fairgrounds concessions
[22:52]
concession buildings. Interim city
[22:54]
manager Gwendai.
[22:55]
>> Yeah, this has to do with the U
[22:57]
concession buildings that are on city
[22:59]
owned property at the fairgrounds. The
[23:01]
item tonight was originally uh prepared
[23:03]
to ask the commission to approve the
[23:06]
lease agreement that's in your packet as
[23:07]
to form and set an annual rental amount
[23:10]
for the buildings. Uh but since that
[23:13]
agenda was prepared, the owner of the
[23:15]
two concession buildings that we often
[23:16]
refer to as the Gaywith buildings, uh
[23:18]
they're the red ones and in the poor
[23:21]
shape. Um those have since been sold by
[23:24]
Mr. Gaywith to uh a family out of
[23:27]
Chapman and the u the owner of those
[23:31]
buildings has looked over the lease and
[23:33]
is acceptable to it depending on what
[23:35]
the um the annual rental amount is for
[23:39]
the city. So, if the commission were to
[23:42]
approve the lease as to form tonight, uh
[23:44]
we would intend to use this agreement as
[23:46]
a standard ground lease for the
[23:47]
remaining concession building owners
[23:49]
with the exception of the central Kansas
[23:52]
free that's already covered by them. Uh
[23:55]
tailoring it only as necessary to
[23:56]
reflect the applicable building uh
[23:58]
ownership information
[24:01]
um which is consistent with the
[24:03]
recommendation your packet. But what we
[24:06]
will do is uh if you're comfortable with
[24:08]
it is ask you to set a lease amount for
[24:12]
um the two buildings since that owner is
[24:14]
agreeable to the um lease as as it's
[24:17]
presented to you and then authorize the
[24:20]
mayor to uh execute that lease.
[24:24]
I don't think it has to be done tonight
[24:26]
if you want to take a look at it. um
[24:29]
actually might be better if you wait uh
[24:31]
till the August 10th meeting because
[24:33]
depending on what you said is the annual
[24:35]
rent that may change the uh building
[24:38]
owner's
[24:39]
um decision. Also,
[24:43]
uh there is a section in there, section
[24:46]
9.4 four in there that requires the
[24:49]
tenant at their expense to make sure the
[24:51]
concession buildings are brought into
[24:54]
compliance with the applicical city
[24:55]
building codes and to obtain
[24:57]
certificates of occupancy by June 30th
[25:00]
of 2027. That gives them a year to bring
[25:03]
specifically those two buildings uh that
[25:05]
Mr. Gaywith used to own up to code um
[25:09]
and that get a certificate of occupancy.
[25:12]
If by
[25:14]
uh they don't say they accept the the
[25:17]
lease as written and uh they don't get
[25:20]
it done by that date, the lease
[25:21]
automatically terminates.
[25:24]
I would personally like to see this on a
[25:26]
study session. I think there's I'm not
[25:28]
sure what time frame the free fair's
[25:31]
range is that it covers the lease of
[25:32]
that building or whatever it is they're
[25:34]
paying back to the the free fair, but I
[25:36]
don't feel like there's any urgency to
[25:39]
ramrod this through. And I think
[25:40]
especially without any money, I think a
[25:42]
lot of those other questions are up in
[25:44]
the air. So I'd like to do a study
[25:45]
session and maybe chat with. Seems like
[25:47]
we have a new owner than we were even
[25:49]
contemplating 3 months ago or the last
[25:51]
time this came in front of us. So I'd
[25:52]
like to get some input from them and
[25:54]
potentially I don't know if there's
[25:56]
other building owners. I know the fair
[25:58]
owns one of those buildings. I think
[25:59]
maybe there's another private owner as
[26:01]
well. Is that accurate? Yeah, there's a
[26:04]
private owner that uh I've asked the
[26:06]
city attorney to send a letter to
[26:07]
because she's not responding to our uh
[26:09]
request to review the lease. Um this
[26:14]
basically what we're asking for and
[26:16]
Aaron can weigh in on this is when Mr.
[26:18]
Gaywith came to the city and said he
[26:20]
wanted to sell those and wanted our
[26:22]
permission. We can't find a lease.
[26:24]
There's not a lease on record at the
[26:26]
courthouse and none of the people who
[26:28]
say they own those buildings to provide
[26:30]
a lease with the city. Um so and Erin
[26:34]
maybe you can explain if absent a lease
[26:36]
how that those structures are treated.
[26:41]
>> Sure. As uh Mr. Quundai mentioned
[26:43]
there's no evidence that we were able to
[26:45]
find that the occupancy has been
[26:48]
formalized or that the structure has
[26:51]
been severed in terms of ownership from
[26:54]
the underlying real estate which is
[26:56]
clearly owned by the city as the record
[26:59]
owner of the whole fairgrounds. So in
[27:01]
Kansas, the default rule if if we do
[27:04]
wish to recognize any form of lease is
[27:07]
that the law will supply and imply the
[27:11]
terms of it in the absence of a written
[27:13]
agreement. And again, that assumes it's
[27:15]
actually a lease uh in the first place.
[27:18]
But if if there is a lease and we don't
[27:20]
have all the material terms, then it's
[27:23]
deemed a tenency at will and terminable
[27:25]
at any time by the landlord, which is
[27:28]
the city upon 30 days advanced written
[27:30]
notice. So uh the correspondence will
[27:33]
advise that we wish to formalize in the
[27:36]
same manner as this lease or whatever it
[27:38]
is that you all approve and if an agre
[27:41]
agreement is not reached then we have no
[27:43]
choice but to treat it as a tenency at
[27:45]
will and possibly terminate it that
[27:48]
would be a decision to make as well but
[27:50]
that is the those are the implied terms
[27:53]
uh in the absence of a written agreement
[27:55]
that spells those out
[27:58]
and I guess for the purposes of a study
[28:00]
session Uh the lease
[28:03]
um
[28:05]
describes the property being lease, the
[28:07]
permitted uses, the maintenance
[28:08]
responsibility, utilities, insurance,
[28:10]
alterations, inspections, default
[28:13]
provisions, and termination procedures.
[28:15]
Um I guess for a study session, I don't
[28:19]
what additional information the
[28:20]
commission would like us to bring. Uh
[28:25]
I guess characterizing this as a
[28:27]
standard lease except for provision 9.4.
[28:29]
for
[28:30]
>> I think more than anything I think it
[28:32]
would be how much can the place support
[28:35]
lease-wise, moneywise? Um, have they
[28:37]
been have these properties any of them
[28:40]
been paying anything over the past prior
[28:43]
years?
[28:44]
>> Uh, no. We've had no lease had no leases
[28:46]
with them. Uh, it's my understanding
[28:48]
that they pay the fair board $300 to
[28:51]
operate during the fair.
[28:52]
>> Okay. But as far as uh a lease amount to
[28:56]
be on our property, no, there's no
[28:58]
record of it. And our recommendation
[29:01]
would be
[29:03]
something is uh $100 and that would take
[29:06]
care of, you know, any paperwork that we
[29:07]
have to do or inspections, things like
[29:09]
that.
[29:10]
>> And $100 a month or per year?
[29:12]
>> Per year.
[29:12]
>> Okay.
[29:13]
>> Because I was looking at the insurance
[29:14]
requirements, too. Do you know if they
[29:16]
currently have to have that level of
[29:18]
insurance on it for to operate out of
[29:21]
the fair board?
[29:22]
>> No, not what the fair board requirements
[29:24]
are, I'm not aware of. Okay. And that's
[29:26]
why we think it's important to have an
[29:28]
actual lease since it's on the real
[29:30]
property owned by the city to have those
[29:33]
things spelled out
[29:34]
>> within the lease.
[29:35]
>> I just didn't know what that um a policy
[29:38]
like that would would cost, you know,
[29:40]
somebody to operate that over the year.
[29:43]
Um, so that would be my question is
[29:45]
whether it'd be financially feasible for
[29:48]
an operator to pay that level of
[29:50]
insurance to justify it throughout the
[29:53]
year.
[29:54]
>> I thought our previous discussion was
[29:56]
that they couldn't use it outside of the
[29:57]
fair anyway.
[29:58]
>> I mean that's what I meant through the
[29:59]
fair. I mean to justify it.
[30:00]
>> I think the discussions we've had
[30:02]
previously when we've discussed those
[30:03]
buildings that may have been before your
[30:04]
time
[30:05]
>> probably. So
[30:05]
>> but was that they weren't allowed to use
[30:07]
those those buildings for
[30:08]
>> right just three weeks renting them
[30:10]
something that they can't use.
[30:11]
>> Yeah.
[30:14]
I I'm
[30:15]
>> They do use them uh during the fair
[30:17]
time. Now, uh Mr. Gaywith, I believe,
[30:21]
used them. I'm not sure if he did at the
[30:23]
last fair. And the um what's the last
[30:26]
name, not Martinez? Lucero
[30:29]
>> Sora.
[30:30]
family out of Chapman plans on
[30:33]
using them during this fair.
[30:34]
>> Okay.
[30:35]
>> But that they already have an agreement
[30:37]
with the fair for those for that period
[30:39]
of time. I I think it's the same thing
[30:41]
that any food vendor whether you're
[30:43]
mobile or in a building would pay
[30:47]
the two different um items. One, the
[30:51]
fair charges v food vendors to operate
[30:54]
uh as part of the fair's revenue.
[30:56]
Vendors pay that because they think
[30:57]
they'll make a you know profit
[30:58]
operating. This is they have buildings
[31:02]
on city- [snorts] owned property. We
[31:04]
have nothing that governs, you know,
[31:08]
those types of things as far as their
[31:09]
responsibilities, our responsibilities,
[31:11]
what they can use them for. It's all up
[31:13]
in the air. So,
[31:15]
>> my only concern would be is I don't want
[31:17]
to put anything in place monetarily wise
[31:20]
that would hinder them from wanting to
[31:23]
continue operating would be my only
[31:25]
>> right. Uh the one building and I
[31:27]
couldn't tell you it's the one closest
[31:29]
to the carnival is the one they plan on
[31:31]
using. they do not plan on using the one
[31:33]
on the other side because they realize
[31:35]
it needs to be fixed up. So, uh getting
[31:38]
these this lease in place, uh
[31:43]
this family will they say they're going
[31:45]
to fix it up. They've already started
[31:46]
working on the one and we give them a
[31:48]
year to bring it up to code.
[31:51]
I guess my biggest question when I was
[31:52]
looking through that lease was, you
[31:53]
know, are there any comparable lease
[31:56]
amounts from other I know it's kind of a
[31:58]
unique situation, but
[31:59]
>> yeah, I mean, we're fine if it's a
[32:01]
dollar. It's our goal is to get uh the
[32:05]
basic terms outlined. So the uh building
[32:10]
owners if if you will know what's
[32:12]
expected of them for being on city
[32:14]
property and then city knows what the building tenants or owners are
[32:21]
responsible for. Right now there's
[32:22]
nothing.
[32:24]
Well, knowing that the yearly rate can
[32:27]
be next to nothing, the only thing that
[32:28]
I would be concerned about is how much
[32:30]
they'd have to pay for that insurance
[32:32]
requirement and whether that would be a
[32:35]
um hindrance to them or not. If we could
[32:37]
find that out, then I would be
[32:39]
definitely just pull the trigger and
[32:40]
have them sign that lease written as it
[32:42]
is.
[32:43]
>> I'm not sure on that amount. Uh but Mrs.
[32:47]
Goria brought the lease back signed.
[32:49]
>> Okay. And I told her that
[32:52]
we need to bring this before you first,
[32:54]
make sure you're okay with it, and then
[32:55]
we would ask her to sign it.
[32:59]
>> I'm okay with Miss Gwith or Mrs. Sora,
[33:02]
did you say, has signed it already?
[33:04]
>> Yes, there's actually they put two
[33:06]
people's name on there, but we require
[33:07]
that they provide us with a bill of
[33:09]
sale. Uh, and there's only one name on
[33:11]
the bill of sale.
[33:12]
>> Okay. I'd be okay with moving forward
[33:14]
with the lease if if they're okay with
[33:16]
the with the terms. Sounds like they are
[33:19]
based on the fact that they've already
[33:21]
>> signed it. I don't want to charge them
[33:23]
any more than we need to then to cover
[33:24]
the cost of processing the paperwork to
[33:28]
do the lease.
[33:29]
>> So, whatever that is on a yearly basis
[33:31]
for the admin fee, $100 a year.
[33:34]
>> Yeah. I mean, that just the number we
[33:35]
picked. It could be anything that you
[33:37]
want, but like you mentioned, we don't
[33:39]
want to charge them something for a
[33:40]
building that they're able to use a
[33:42]
couple weeks ahead of year.
[33:44]
>> Same. Yeah. I don't want to stop the use
[33:46]
of it at all.
[33:47]
>> Right. And that was my concern.
[33:48]
>> This would be great to get it
[33:50]
formalized. Here's your expectations.
[33:52]
Here's what you can expect from us. And
[33:53]
oh, by the way, you have to bring it up
[33:55]
to code or the it goes away.
[33:57]
>> Okay. Do we have to agree on the amount
[33:59]
today on the lease or is that something
[34:01]
that you can negotiate?
[34:03]
>> Uh that's completely up to you. Uh but I preferable if you would set that
[34:07]
because then when we get a hold of the
[34:10]
third building owner, we already have
[34:12]
that number set.
[34:13]
>> Okay.
[34:14]
>> Does that make sense?
[34:15]
>> Yeah. I don't want to charge the uh
[34:17]
>> somebody different
[34:17]
>> story is something different.
[34:21]
>> Would there be a benefit to waiting
[34:22]
until after this fair is over?
[34:26]
>> A benefit uh unless you there's
[34:29]
something that uh the commission
[34:31]
analysis study something you want us to
[34:34]
bring back for you to consider chew on
[34:38]
whatnot. [clears throat]
[34:38]
Commissioner Kof, I think he said that
[34:41]
he would like the potential um
[34:45]
at lease
[34:47]
the suras to come to a work study and
[34:49]
walk through this with you. Um not
[34:51]
necessarily them, but anybody else. It
[34:53]
sounds like we're maybe not reaching out
[34:55]
or we're not finding any of the other
[34:57]
owners, but if we're going to have
[34:58]
things that apply universally, I don't
[34:59]
think one person's signature should
[35:01]
dictate their neighbor's rent or terms
[35:03]
for a lease. Well, we've uh reached out
[35:07]
several times, even twice by uh letter.
[35:11]
One of them, I believe, was certified,
[35:12]
but I'll have to confirm that to the
[35:14]
other property owner, other building
[35:17]
person who has similar buildings at
[35:20]
other fairgrounds, and uh she's just
[35:25]
won't respond.
[35:25]
>> Not responsive.
[35:26]
>> Yeah,
[35:28]
I we've been trying now for several
[35:31]
months. The last phone call I had with
[35:32]
her was probably at the beginning of the
[35:34]
year, maybe at uh it probably at the
[35:36]
beginning of the year, and her comment,
[35:38]
if I remember correctly, was,
[35:41]
"I had a lease. I turned it into the
[35:43]
city.
[35:44]
I don't need another one." Well, we
[35:47]
don't have it. You don't have it. The
[35:49]
courthouse doesn't have it. We need a
[35:51]
new one. Just basic, simple, and we
[35:54]
can't get a response. That's why I asked
[35:56]
the city attorney to write a letter
[35:58]
saying, "We'd like you to get a hold of
[36:00]
us so we can discuss this before we move
[36:02]
to the next step and ask the
[36:03]
commission," what do you want us to do?
[36:06]
>> Well, all four of those buildings serve
[36:07]
the same purpose and aren't going to
[36:09]
serve any separate purpose outside of
[36:11]
their purpose that they're serving now.
[36:13]
Is that correct?
[36:14]
>> As I understand it, yes.
[36:15]
>> Yeah. Then I'd say make it a standard
[36:17]
dollar a lot lease.
[36:19]
>> Annual.
[36:20]
Annual. Would it help to have
[36:23]
this in place before the fair actually
[36:25]
gets here so you can hand deliver it to
[36:27]
that lady that's not getting back with
[36:28]
us?
[36:30]
>> I don't know that she's going to have
[36:31]
one there. Uh
[36:33]
>> but you know that's a good idea. If the
[36:35]
commission were to approve the lease as
[36:37]
a form if she's open we can have
[36:40]
somebody drop it off to her and say hey
[36:42]
and have another conversation with her.
[36:45]
>> I would imagine she'll I would imagine
[36:47]
she'll be there.
[36:48]
>> Yeah. I mean I've spoken to her on the
[36:49]
phone a couple times. long conversations
[36:52]
that Yeah. reaching out another time
[36:54]
does hurt.
[36:56]
>> That's a good idea. When she's there
[36:57]
working.
[36:58]
>> Yeah.
[36:59]
>> You know, if she's not responding, maybe
[37:01]
that would be one way to get into her.
[37:02]
So,
[37:02]
>> yeah.
[37:03]
>> And as a landlord, you have a standard
[37:05]
lease regardless of who's
[37:08]
occupying.
[37:09]
>> Correct.
[37:10]
>> So, that's I'm okay with a dollar a year
[37:12]
standard lease. I'd approve it.
[37:15]
>> You say one
[37:16]
>> a dollar a year. Yeah.
[37:17]
>> Does that cover your paperwork and
[37:18]
everything that you probably
[37:20]
>> $1? No, but that's that's okay.
[37:21]
>> Just errands.
[37:22]
>> Okay. [laughter]
[37:24]
>> It covers an hour of errands time.
[37:27]
>> Pretty cheap lawyer.
[37:39]
» Or if there's a definite amount, I'm
[37:40]
open to it. But just keep it cheap.
[37:43]
>> I would think $100 a year would cover
[37:46]
anything we have to amend.
[37:51]
I'll make a motion to consider the
[37:52]
approval of the ground lease of the
[37:54]
fairgrounds concession buildings
[37:57]
at an annual rate of $100 a year.
[38:00]
>> I'll second.
[38:02]
>> That would include the uh authorizing
[38:04]
the mayor to execute those.
[38:07]
>> Correct.
[38:11]
» I I'll second again.
[38:14]
>> Motion has been moved and seconded. Do
[38:15]
we have any commission discussion?
[38:19]
Seeing none of the roll call vote.
[38:21]
Commissioner Meisenberg,
[38:22]
>> yes.
[38:22]
>> Vice Mayor Taylor,
[38:23]
>> yes.
[38:24]
>> Commissioner Kolhoff,
[38:24]
>> nay.
[38:25]
>> Commissioner Lidle,
[38:26]
>> yes.
[38:26]
>> Myself, yes. Motion carries. Our next
[38:29]
item is 7 C. Continue discussion
[38:31]
regarding the storm water financial
[38:32]
review and recommendations. Interum city
[38:34]
manager Quinday.
[38:35]
>> Yeah. To purpose of tonight's discussion
[38:38]
is uh not to revisit the KMU storm water
[38:40]
rate study. Uh the discussion is
[38:42]
intended to be much narrower. We're
[38:44]
asking for the commission for direction
[38:47]
on how you would like to implement the
[38:48]
revenue requirements uh already
[38:50]
identified by the KMU study. The report
[38:54]
uh in your packet evaluates three
[38:56]
implementation schedules that all reach
[38:58]
essentially the same long-term rate but
[39:00]
differ in when the customers experience
[39:02]
those uh rate increases and when the
[39:05]
utility receives the resulting revenue.
[39:07]
What has not changed in the report and
[39:10]
our presentation is the underlying
[39:12]
financial analysis. uh KMU with staff's
[39:15]
assistance evaluated operating cost,
[39:17]
maintenance, capital improvements,
[39:19]
reserve requirements, future
[39:21]
infrastructure replacement, and
[39:23]
anticipated debt service. Based on that
[39:26]
analysis, CMU identified the revenue
[39:28]
needed to keep the storm water utility
[39:30]
financially stable over the long term.
[39:34]
The report does not revisit those
[39:35]
conclusions. Um
[39:38]
what we're visiting tonight is at a
[39:40]
previous work study or study session the
[39:43]
commission asked staff to evaluate
[39:45]
different ways to implement those rates.
[39:47]
Uh
[39:49]
the three that they asked us to uh
[39:51]
evaluate were the KMU recommendation
[39:55]
um that minimizes customer impacts
[39:57]
during the first two years which would
[39:59]
be a 75 cent increase per drainage unit
[40:02]
in the first year 8 cents in the second
[40:04]
year and then it has a significant jump
[40:06]
in year three when we anticipated
[40:09]
potential debt service. Uh and we used
[40:11]
$1 million as that number. Um that
[40:16]
approach aligns with the increase when
[40:19]
if the commission were to say go fix
[40:21]
this drainage issue here, the timing it
[40:24]
would take for us to uh get it
[40:26]
engineered, go out for bids and get the
[40:29]
uh debt service to you would be in three
[40:32]
years. The other alternative uh spreads
[40:35]
the increases more evenly over the first
[40:37]
three years. It'd be uh 76 cents a year.
[40:41]
we had talked about at study session 75,
[40:44]
but the math is about 76 cents. So
[40:47]
instead of one significant adjustment,
[40:49]
uh customers experience a more gradual
[40:51]
progression while still uh reaching the
[40:54]
same long-term rate in year three. And
[40:57]
the other alternative uh put forth by
[40:59]
Commissioner Kolhoff was to implement
[41:01]
the increases immediately. Uh it
[41:04]
generates additional revenue sooner but
[41:06]
also results in the largest customer
[41:08]
increase in the first year. that would
[41:10]
be taking uh going from our rate now to
[41:14]
the 354 I believe is what that number
[41:17]
is.
[41:18]
So the residential impacts for
[41:20]
residential customers uh the analysis is
[41:23]
straightforward. Nearly 99% of our
[41:26]
customers are assigned one drainage
[41:28]
unit. That means almost every homeowner
[41:30]
experiences essentially the same monthly
[41:32]
increase regardless of where they live.
[41:35]
Uh the only difference is when that
[41:36]
accre occurs under each implementation
[41:40]
schedule.
[41:42]
Commercial customers are different
[41:43]
because the businesses with larger
[41:46]
parking lots and roofs generate more
[41:48]
runoff and therefore are assigned more
[41:50]
drainage units. Again, the rate itself
[41:53]
does not change among the alternatives.
[41:55]
Only the timing changes. Likewise, all
[41:58]
three alternatives ultimately generate
[42:00]
essentially the same annual revenue at
[42:01]
the end of three years. The difference
[42:04]
is when the utility receives that.
[42:06]
Alternate uh two that would be
[42:10]
um doing it all at once provides the
[42:12]
strongest early cash flow. Alternate one
[42:15]
falls in the middle. That's doing it
[42:16]
over three years. And then the KMU
[42:19]
recommendation delays the largest
[42:21]
increase until the projected debt
[42:23]
service begins.
[42:25]
Ultimately, this is a policy decision
[42:27]
rather than a financial one. Uh the
[42:29]
report concludes that all three
[42:30]
alternatives achieve essentially the
[42:32]
same long-term objective. All three
[42:34]
produce essentially the same revenue and
[42:37]
the commission's decision is really a
[42:39]
choice between customer impact and the
[42:41]
timing of revenue. Staff is not
[42:43]
recommending one implementation schedule
[42:45]
over another. What we're asking from the
[42:48]
commission is to review the analysis,
[42:50]
discuss the alternatives, and provide
[42:51]
direction regarding which schedule you
[42:54]
would like staff to prepare for for
[42:56]
adoption or for your consideration.
[42:59]
Should the commission elect to revise
[43:01]
the schedule uh or choose AMUs,
[43:05]
alternate one, alternate three, uh we
[43:09]
would recommend an effective date of
[43:10]
those rates of January 1, 2027 to
[43:13]
provide customers adequate notice and
[43:15]
allow sufficient time for public
[43:17]
communication and implementation and
[43:20]
also for those entities that uh budget
[43:22]
annually to prepare for it.
[43:26]
Are there any question?
[43:39]
» Have any thoughts on those three
[43:40]
options?
[43:42]
>> A little bit of discussion.
[43:43]
>> I think we get before we get to the
[43:44]
money raise option. I've had obviously
[43:46]
quite a bit of time to think about this
[43:48]
since our last meeting. I really want a
[43:50]
concrete plan for fixing the issues that
[43:52]
we know about, preparing for the ones
[43:54]
that we don't know about before we raise
[43:55]
a single penny in taxes or revenue from
[43:58]
our customers. It's all fine and good.
[44:00]
We've got 5 years of runway if we don't
[44:02]
do anything. So, I don't think we need
[44:04]
to approve this today or next week or
[44:05]
next month. We need to get a plan for
[44:07]
fixing the issues that we know about.
[44:09]
They were brought to a head here.
[44:10]
There's what, a half a dozen areas that
[44:13]
get water in their front yards,
[44:15]
backyards, driveways, basement,
[44:18]
including our own city building. Um, and
[44:21]
it's an issue that's been going on as
[44:23]
long as I've been in town. I've been
[44:24]
here 17 years, and it's been exactly the
[44:26]
same. Fourth Street floods,
[44:29]
uh, summit or whatever it is up
[44:31]
northwest, there's something northeast,
[44:33]
there's something in the south. The
[44:34]
people, uh, actually I had the privilege
[44:36]
of talking with a gentleman over the
[44:37]
weekend. They don't even, you're
[44:38]
correct. They don't actually tell us
[44:39]
anymore when the southside floods. They
[44:41]
just expect it. Um, so that's those people aren't coming to meetings.
[44:45]
They just know that we don't care. And
[44:47]
so before we come up with a plan to
[44:49]
raise the money, I think we need to come
[44:50]
up with a plan to fix it. Then we'll
[44:52]
know how much money we need and then we
[44:53]
can raise it appropriately.
[44:59]
Well,
[45:03]
I can't speak for the commission, but
[45:04]
speaking for city staff, I'm not sure I
[45:07]
would characterize it as we don't care.
[45:09]
Um, we also do have a plan that was
[45:12]
approved by the city commission
[45:14]
identifying the top, I believe, five.
[45:17]
There's a few more um drainage priority
[45:20]
areas that you want us to address.
[45:23]
The first one, of course, is the uh
[45:25]
South Park, which is anywhere between 16
[45:28]
and more than $20 million. Unlikely
[45:30]
we'll be able to do that without some
[45:32]
significant federal uh funding grants,
[45:35]
but there are also others that were
[45:37]
identified on there. We brought those
[45:40]
costs to the commission, those
[45:42]
estimates, and they range between$1 and
[45:44]
$2 million. And then the young man, I
[45:46]
always keep on thinking Gary, but uh
[45:49]
that came and spoke to one of the
[45:51]
commission meetings and his neighbors.
[45:53]
We asked uh the engineers to come on
[45:55]
site when they were already here for
[45:56]
something else to get twice the bang for
[45:59]
our buck. Uh they walked that area with
[46:03]
um public works and came up with a plan
[46:07]
and a opinion of that construction cost
[46:10]
which is close to $2 million.
[46:12]
>> That was the void and the
[46:13]
>> Hess. Yeah. Okay. Yeah. Uh now that is
[46:17]
just a okay here's what we can see from
[46:20]
available information. Um I told the uh
[46:26]
Olsson folks and the people in that
[46:28]
neighborhood that we will bring that
[46:29]
back to the city commission and say okay
[46:31]
here's what they have. Here's what they
[46:33]
think it's going to be. But to move
[46:35]
forward and get a high dollar cost or a
[46:37]
high cost, they'd actually have to
[46:39]
engineer it. So we'd, you know, enter
[46:41]
into an engineering agreement uh with
[46:43]
them if that's the priority that you
[46:45]
want. So, I bring that up because we do
[46:48]
have projects um
[46:51]
that were identified as being priorities
[46:53]
by the commission. And even without
[46:57]
those projects being identified, yes, we
[46:59]
have $600,000 in there, but um the
[47:04]
photograph I sent you of the hole over
[47:06]
here by city hall, uh the estimate for
[47:09]
that is anywhere between 13 and $28,000
[47:13]
to uh repair. Now, that $13,000 is
[47:17]
repairing what's in the hole. the uh
[47:20]
28,000 or $23,000 is to go about almost
[47:24]
a half a block farther. If that pipe,
[47:27]
which is that bitrius clay, which is
[47:29]
cracked, is cracked even further, that
[47:31]
price will continue to grow and at some
[47:34]
point it will exceed our capabilities.
[47:37]
So,
[47:38]
realistically, um staff would be able to
[47:41]
use that $600,000 to start fixing those
[47:44]
issues that we have now. Um, you know,
[47:47]
in the past, and I'm not an engineer,
[47:49]
and I'm not speaking to anybody's
[47:51]
decisions that they made before, but in
[47:53]
the past to save money, they would wrap
[47:56]
it in tin uh and pour concrete over and
[48:00]
hope that it didn't break again. I can't
[48:02]
find anybody in the uh that part of the
[48:07]
profession, engineers or other cities
[48:10]
that say cut out the bad pipe, slide in
[48:14]
new pipe, put in some couplings, and fix
[48:16]
the problem. Don't pour concrete over
[48:18]
it, and hope that it it works. So, u we
[48:21]
either have to start fixing the drainage
[48:23]
issues or just pick them down the can
[48:26]
again. Now, that may sound
[48:29]
counterintuitive because our
[48:30]
recommendation is if you implement any
[48:33]
of these schedules, not to do it
[48:34]
effective till January 1 of 2027.
[48:37]
However, whatever implementation
[48:40]
schedule you choose, if you pick one, uh
[48:42]
as opposed to doing nothing, then that
[48:45]
gives us time to plan. Okay, based on
[48:47]
this implementation schedule, the number
[48:49]
of meters we have, here's the revenue we
[48:52]
can anticipate that we can start
[48:54]
planning on. Can we do these bigger
[48:57]
projects and we can show granting
[48:59]
agencies that we have the funding
[49:01]
mechanism in place uh to apply for
[49:04]
grants? That makes sense.
[49:09]
» And that's where I was at too just from
[49:11]
I mean this uh spring and summer has
[49:14]
been a good indication or indicator and
[49:16]
a reminder of how bad it actually is.
[49:17]
And that's got it in the front of
[49:20]
everybody's mind. So now is the time to
[49:22]
invest in this cuz it needs reveal. We
[49:25]
need action. We need John, I agree with
[49:27]
you 100%. We need momentum on this. And
[49:30]
I understand that without a plan or
[49:33]
purpose set forth before the money is
[49:36]
in, it's kind of like the snake eating
[49:38]
its own tail in my opinion on how that
[49:41]
works. Um,
[49:44]
I was I I came in today looking for
[49:48]
alternative two, just like what
[49:50]
Commissioner Khof mentioned last time on
[49:53]
let's get the ball rolling on the
[49:55]
funding and let's get the money in the
[49:57]
bank faster so we can fix Gary and
[49:59]
Andy's problem and whatever else we have
[50:02]
on the list that we prioritized as far
[50:05]
as the one and $2 million projects. And
[50:07]
that way, you know, like you said, the bonding and the grant writing, I
[50:12]
mean, we'll have a idea of now we've got
[50:14]
this much money to work with as opposed
[50:16]
to
[50:18]
um, you know, having that hang in the
[50:20]
balance as we try to figure out what we
[50:22]
need and priorities and, you know, we
[50:25]
got engineering to pay for all up front
[50:27]
to get an idea of actual hard cost money
[50:30]
on what these projects are going to
[50:32]
spend as opposed to just best guess. So,
[50:34]
we're going to have to start spending
[50:35]
money for design, engineering, and and
[50:38]
you know, long before construction. So,
[50:41]
>> well, so to your point, we already have
[50:42]
design and engineering from uh prop the
[50:45]
project up at 15th Street that
[50:47]
>> Sure.
[50:47]
>> I don't even know what the the tag was,
[50:49]
but we decided the price tag was for
[50:50]
that, but we decided that wasn't
[50:51]
important. And so, I I want a plan. I'm
[50:55]
willing to carry out a plan, but I want
[50:56]
a plan before we come up with the money.
[50:58]
I mean, it's the same way we did the
[50:59]
baseball field. Get the plan for the
[51:00]
baseball field, raise the money. Let's
[51:02]
get a plan for the water department,
[51:04]
storm, uh, water, sewer, storm. Let's
[51:07]
get the plan and then let's go fix it.
[51:09]
We can raise the money after we have the
[51:10]
plan. I think we're putting the cart
[51:12]
before the horse by just saying, "Hey,
[51:14]
we're taking more and more money." I
[51:15]
don't know. Uh, I hope that you have. I
[51:17]
think, um, I'm not the only one who's
[51:19]
gotten threatening emails from people
[51:21]
about water and sewer rates. Um,
[51:23]
ironically, not even in the city. Um,
[51:25]
but nevertheless, I think that we need
[51:28]
to be judicious about how we are
[51:31]
spending other people's money.
[51:33]
>> 100% are, but we're so far in the hole
[51:35]
that even this increase isn't going to
[51:38]
>> well
[51:38]
>> be effective to cover all that's out
[51:40]
there that we have now. I mean, this is
[51:42]
just a small portion of what needs done.
[51:45]
We know we need to spend it.
[51:48]
I don't have it right in front of me,
[51:49]
but I think the five-year projection
[51:50]
without any of the capital expenditures
[51:52]
was that we would still have $600,000
[51:55]
after five years. So, I I don't disagree
[51:57]
with you. I I agree we need to do
[51:59]
something and we need to do a lot of
[52:00]
things, but I don't think that we need
[52:02]
to do so much that we don't need to come
[52:05]
up with a plan for how we do it. And I
[52:06]
think we're going to rather than playing
[52:08]
whack-a-ole, which is what it feels like
[52:10]
we're doing right now. Um whether it's
[52:12]
southeast, oh that's too expensive,
[52:14]
we're not going to do that. Northeast,
[52:15]
oh, we're not going to do that. Who
[52:16]
knows now? Now, maybe the the west side
[52:18]
is what's more important. Um, and I I
[52:21]
don't I don't feel that we've got a good
[52:23]
plan number one for assessing it or
[52:25]
fixing it. I don't even feel that we
[52:26]
know really what the problem is. I can
[52:28]
tell you I looked over at Gary Boyd's
[52:30]
place um when it was raining and there's
[52:34]
three unique water levels if you drive
[52:36]
up um that's Malberry Street, right?
[52:40]
There's one in the river by the by the
[52:42]
park, right? And that's lower than the
[52:43]
one that's on the right side, which is
[52:45]
where there's some type of drainage
[52:46]
structure that arguably the city the
[52:48]
city is maintaining or owns. And then
[52:50]
there's Gary Boyd's property, which is
[52:52]
like 5 ft higher. And so I don't think
[52:55]
that the problem is I don't think it's a
[52:58]
million- dollar problem. I don't think
[52:59]
it's a half a million dollar problem.
[53:00]
I'm afraid that we're going to spend a
[53:02]
million dollars fixing something that's
[53:03]
probably a a5 or $10,000 problem. And I
[53:06]
don't know if it's I don't know if it's
[53:07]
tree roots. I don't know what I don't
[53:09]
know what the situation is. But I can
[53:10]
tell you that just looking at that
[53:12]
situation right there tells me that
[53:13]
there is a there is an issue that
[53:16]
frankly shouldn't cost $2 million to
[53:18]
fix.
[53:20]
>> Oh, may I ask a question?
[53:22]
>> Yeah.
[53:22]
>> Uh
[53:24]
if
[53:27]
staff says we think this is the issue
[53:29]
and engineers say we think this is the
[53:31]
issue and you don't believe it, what are
[53:34]
you going to believe? I mean how do we I
[53:36]
guess what's the definition of a plan?
[53:39]
Um, your current storm water management
[53:42]
policy requires Brad to come to you with
[53:44]
a list of drainage area issues. He did
[53:48]
that. You didn't accept verbatim what he
[53:52]
suggested. You moved those around and
[53:54]
said, "These are more priorities." So,
[53:56]
for me, that's a plan. Uh,
[53:59]
>> well, I think there's a difference
[54:00]
between saying $2 million we'll fix this
[54:02]
and here's what's wrong with what you
[54:04]
have now. I don't I haven't seen
[54:05]
anything from those folks other than
[54:06]
this is the first I've heard about it is
[54:08]
you telling us about it. So I don't know
[54:09]
if that's real or not, but I think we
[54:12]
we've brought it up a dozen times here
[54:13]
that we think that there's probably
[54:15]
things in the storm drains and we need
[54:17]
to go look and we need to see that.
[54:19]
>> So can I ask another question then?
[54:21]
You're saying that I'm telling you that
[54:22]
but you don't know if it's real. Does
[54:24]
that mean that I'm making it up?
[54:26]
>> No, I don't think you're making it up. I
[54:27]
think absolutely if we spend $2 million
[54:29]
up there, we can fix the problem.
[54:31]
>> I I 100% believe that. But if the
[54:33]
engineering firm says this is what we
[54:35]
think it's going to be,
[54:37]
then who else do we believe? If they say
[54:39]
we think it's going to cost this, you
[54:41]
know, for example, the um CCIP project,
[54:45]
you know, at one point they thought it
[54:46]
was going to be $1.8 million, 1.6, but
[54:49]
they're in the ballpark. Um
[54:52]
you've got to start somewhere. And right
[54:55]
now what we have is opinion of probable
[54:57]
construction costs from an engineering
[54:59]
firm that's looked at these and there's
[55:01]
work for the city looking at your
[55:02]
drainage areas and all of that. So to me
[55:05]
you have a priority list. The plan is,
[55:08]
okay, now we've got to be able to pay
[55:10]
for these. Once you have that mechanism
[55:12]
in place and you know, okay, based on
[55:15]
the 3,000 [clears throat] properties,
[55:18]
whatever that number is, we know we're
[55:20]
going to go from $60,000 a year revenue
[55:22]
to $21,000.
[55:24]
So then we can plan, okay, how much of
[55:27]
that needs to go towards debt service.
[55:29]
And if the commission says we can't
[55:31]
afford south, that's $20 million. We
[55:34]
want you to do this one. Focus on that
[55:37]
first. Well, now we know when we go to
[55:39]
the granting agencies, the state and
[55:41]
that that okay, we're not bringing in
[55:44]
60,000. We're bringing in $200,000.
[55:47]
We're able to service that as opposed to
[55:50]
saying, you know, uh, well, we got
[55:53]
$60,000 and in five years we're going to
[55:55]
have $600,000 like we do today. It's not
[55:58]
going to fix anything.
[56:00]
I haven't
[56:02]
come across a project yet in the year
[56:04]
I've been here for uh drainage that has
[56:07]
been under $600,000.
[56:09]
I just haven't. Um
[56:16]
yeah I you know it's you had mentioned
[56:19]
and maybe I misunderstood the process
[56:21]
for the uh sports complex but it was my
[56:25]
understanding that the uh public voted
[56:28]
for that quality of life sales tax and
[56:32]
the idea was to put some ball fields out
[56:34]
there and the city I believe bonded that
[56:37]
amount. Well, you did because it
[56:39]
happened right when I got here. $4
[56:41]
million for it. But it took several
[56:44]
months before
[56:46]
the design was brought to the commission
[56:48]
to say yes, move forward.
[56:50]
>> I'd encourage you to look at the history
[56:52]
of that. I think there's some people
[56:54]
sitting up here can tell you the amount
[56:55]
of planning that went into it before
[56:57]
that ever went up for a vote.
[57:00]
>> I can just read what the uh the ballot
[57:03]
question was. quality of life and that
[57:05]
uh
[57:06]
>> yeah, there's been a lot of meetings
[57:07]
that happened before that though and
[57:08]
many of them in this room that happened
[57:09]
before we ever got to that point. I
[57:11]
think Kelly can speak to that as well.
[57:12]
There were there was a ton of work and
[57:15]
frankly if that same amount of work was
[57:16]
done on the storm water study, I would I
[57:18]
would pass it today. If we had all the
[57:20]
work that they had done before that had
[57:21]
gone to a ballot question, I would
[57:23]
absolutely sign off on this today.
[57:25]
>> And what kind of work was that?
[57:27]
>> Kelly, do you want to you want to share?
[57:28]
I mean, no. I mean, you're telling me
[57:30]
that the amount of work that they uh
[57:32]
did.
[57:33]
>> Yeah. They had a plan for
[57:34]
>> explain to me what that work is that you
[57:36]
need me to do for storm water.
[57:37]
>> I I would you I mean, you're coming up
[57:39]
here and you're giving us what your
[57:41]
perspective is. I'm telling you, I was I
[57:42]
was in the room when we had plans and
[57:44]
drawings for I think at one point there
[57:46]
was like eight or 10 ball fields. I
[57:48]
mean, so there was a lot of work that
[57:49]
went in before we went to raise money
[57:52]
from the public before we asked them to
[57:53]
spend their money on public
[57:55]
improvements.
[57:55]
>> Was that who gave you the the drawings?
[57:57]
I'm just curious now. At this point, I
[57:59]
don't remember. We've had six different
[58:01]
people who had their hands in it. Um I
[58:03]
think it was Mammoth if I was guessing.
[58:06]
Um I think they were the ones who's kind
[58:07]
of started the process.
[58:08]
>> I think they were the first ones. Yeah.
[58:10]
>> Yeah. So
[58:12]
I I think it's fine to raise rates. I
[58:15]
think there's things that need to be
[58:16]
fixed. I think I would like to see the
[58:17]
plan first.
[58:18]
>> And I still don't understand what your
[58:20]
definition of plan is.
[58:21]
>> Okay. So was that you said you have an
[58:23]
opinion of probable cost from
[58:26]
>> the engineering firm on that project
[58:28]
>> for the folks that came in last time,
[58:30]
>> right?
[58:31]
>> Yes.
[58:31]
>> And I think we did have that discussion
[58:33]
at that time. [clears throat] I don't
[58:35]
believe I can't remember if that was on
[58:37]
our approved priority list or not. At
[58:40]
that time
[58:41]
>> it was not,
[58:41]
>> but that was one that you're actually
[58:43]
facing risk of loss
[58:46]
for the those two homes right there. So,
[58:48]
it kind of I guess got elevated on that
[58:51]
list. Is that something you can you can
[58:55]
send that to us? I don't know how
[58:57]
detailed it is.
[58:58]
>> It's a a one sheet based on, you know,
[59:01]
what they think they're going to need,
[59:02]
whether it's um 48 inch pipe, RGB. It's
[59:06]
a little bit technical on the details,
[59:08]
but it'll tell you what the cost is. Uh
[59:10]
they also have a I believe a map showing
[59:13]
where they would build that. Um, and I,
[59:17]
it's not Gary, but the gentleman that
[59:18]
came in and started it, uh, the
[59:21]
engineers agree with him that when a lot
[59:23]
of that work was done up by Pizza Hut
[59:25]
and stuff, where that water was going to
[59:28]
go was not accounted for
[59:30]
in there. And I've seen um,
[59:34]
where our guys have tried to secure the
[59:36]
manhole cover, but it won't hold. It
[59:39]
blows up in the air because of that. But
[59:40]
yeah, it's a it's an issue.
[59:44]
So I guess if you could send us details
[59:46]
on that specific one. Um because I mean
[59:49]
even if none of these are really going
[59:50]
to go into effect until next year
[59:51]
anyway. So we could review that and
[59:54]
[clears throat] see if that's something
[59:54]
that we want to prioritize first since
[59:56]
there is risk of loss to homes. Um which
[59:59]
I think warrants
[1:00:01]
rising rising that prior or rising up
[1:00:04]
that priority list. Right.
[1:00:06]
>> Um and
[1:00:07]
>> we can bring that and the currently
[1:00:09]
approved priority list to you. Uh, and
[1:00:11]
if you want to readjust that, we're
[1:00:14]
supposed to do it annually, but you're
[1:00:16]
can do it anytime you want.
[1:00:18]
>> But if we have that opinion of probable
[1:00:19]
cost and then the mapping on it too to
[1:00:21]
kind of show what exactly would be
[1:00:23]
happening and
[1:00:25]
>> put on the I think that would be put on
[1:00:27]
the agenda.
[1:00:28]
>> I think that would be helpful. Yeah,
[1:00:29]
that would be good to have that list up
[1:00:31]
in front
[1:00:32]
>> front and center. That way we can just
[1:00:35]
look at the amounts y
[1:00:36]
>> and what we're talking about. That way
[1:00:38]
we can get an idea about a plan and
[1:00:42]
what's actually been engineered and what
[1:00:44]
has a plan behind it and funded on it.
[1:00:47]
>> None of those on your list have been
[1:00:49]
engineered,
[1:00:50]
>> right? And we need money to do that. So,
[1:00:51]
we got to get started sooner rather than
[1:00:54]
later on this
[1:00:55]
>> because we have to have it uh but to get
[1:00:59]
a uh a grant, you'll have to have a
[1:01:02]
professional engineering report. Most
[1:01:04]
granting agencies now require that. It's
[1:01:07]
not a full design, but they've got to
[1:01:09]
come out and say, "Okay, we're not just
[1:01:12]
looking at aerials and and whatnot.
[1:01:14]
We've been on the ground and here's what
[1:01:15]
we think it's going to cost."
[1:01:17]
>> An actual survey and they open actually
[1:01:19]
open the hood and look at it. Yeah.
[1:01:21]
>> Once you identify a project before we go
[1:01:23]
look at granting agencies, we've got to
[1:01:24]
get them going on that cuz they're
[1:01:26]
required for most of them,
[1:01:27]
>> right?
[1:01:32]
I think that'd be helpful just because
[1:01:33]
it felt like that one kind of jumped up
[1:01:35]
the priority list a little bit.
[1:01:37]
>> And it's not even on the list, too.
[1:01:38]
>> It's not on the list. It wasn't on It
[1:01:40]
wasn't on Well, was it?
[1:01:42]
>> No.
[1:01:44]
>> I will say if I can real quick, there's been a little bit of property
[1:01:48]
loss on the fourth of my street area
[1:01:50]
with flooded cars and stuff like that.
[1:01:53]
That's been ongoing. So, my opinion that
[1:01:55]
area, it's all part of the Southeast
[1:01:57]
drainage project, but I think we need to
[1:02:00]
look at the new drainage
[1:02:03]
uh possibilities of more structures and
[1:02:06]
stuff put in between downtown and Brady
[1:02:10]
specifically before it had gone out into
[1:02:12]
that area because that that could be one
[1:02:14]
whole project by itself.
[1:02:16]
>> What is the public interest in this
[1:02:18]
project? I think uh one of the things I
[1:02:20]
was told with the Northeast 15th Street
[1:02:23]
project was that that was a private
[1:02:24]
concern. How does this one on uh Summit
[1:02:28]
differ from that?
[1:02:33]
» Yeah, because I don't know where Summit
[1:02:35]
>> Yeah. So that
[1:02:38]
was that
[1:02:39]
>> that's the boy.
[1:02:41]
>> Yeah. So that was that was more of a
[1:02:43]
private there was a little bit of a
[1:02:44]
situation that that was done years ago
[1:02:46]
before any drainage study requirements
[1:02:48]
were actually needed or implanted by the
[1:02:51]
city at that time. So we had a a
[1:02:54]
facility they got that built and so all
[1:02:57]
the water water runoff went directly to
[1:03:00]
neighboring properties without any type
[1:03:03]
of a drainage control. And so there was
[1:03:05]
a I'll just say it a little bit of a um
[1:03:09]
situation between the two adjacent
[1:03:11]
property owners that really did had
[1:03:13]
nothing to do with what the city
[1:03:15]
developed or put in um for the
[1:03:18]
structures of drainage that were needed
[1:03:20]
from our side of things at that time. Of
[1:03:22]
course, this is way before my time, but
[1:03:25]
um that's the history of the situation
[1:03:27]
there. That's kind of why we did look
[1:03:30]
into how we could improve some drainage
[1:03:33]
up in that air area, but it also um
[1:03:37]
basically started with um two adjacent
[1:03:39]
property owners.
[1:03:41]
That's why that situation kind of got
[1:03:43]
pushed to the side because I I know um
[1:03:46]
city attorney Martin got involved in a
[1:03:48]
little bit of that and and and
[1:03:51]
why we were making some discussions and
[1:03:54]
ultimately we kind of decided that the
[1:03:57]
main complaint wasn't necessarily a city
[1:04:00]
situation.
[1:04:03]
>> How many homeowners are affected in this
[1:04:05]
area?
[1:04:07]
>> Which which area again? Sorry, the
[1:04:09]
summit northwest area there.
[1:04:13]
>> Um, specifically right in the corner
[1:04:17]
that I know that it cuts through. I
[1:04:18]
mean, you're probably at least three for
[1:04:20]
sure. Could be up to five. And I know
[1:04:22]
part of the plan that you guys haven't
[1:04:24]
seen yet was some drainage um upsizing.
[1:04:26]
Generally, uh, they look at 20 to 30%
[1:04:30]
upsizing of of drainage structures and
[1:04:33]
tubes um, for replacement to increase
[1:04:36]
the flow rate.
[1:04:39]
Uh Mr. Boyd did come to my office here
[1:04:41]
the other day when the between the two
[1:04:43]
days we got Abling got the combined
[1:04:45]
about five inches um about a week ago
[1:04:48]
and last Thursday and Friday and um said
[1:04:51]
that the manhole lid did stay on after
[1:04:53]
we kind of um [clears throat] u
[1:04:56]
rubberized it down and it stayed in
[1:04:58]
place and he said that it did flow
[1:05:00]
through there pretty good on that one.
[1:05:01]
So maybe it just wasn't the volume on
[1:05:03]
that particular rain. So,
[1:05:07]
but I would recommend that if we're if
[1:05:09]
we're going to look into this more, you
[1:05:11]
giving Mr. Quinay and myself the
[1:05:13]
authority to get another probable cost
[1:05:15]
of um improving fourth and fifth because
[1:05:18]
that was one originally on part of the
[1:05:20]
plan. And I personally do believe that
[1:05:23]
we need more structures to carry that,
[1:05:25]
but it's going to be a major project.
[1:05:28]
>> Do we have any kind of ballpark on that
[1:05:30]
one?
[1:05:30]
>> No. I think there's an overall cost of
[1:05:32]
the complete southeast drainage project
[1:05:34]
structure and I think that's maybe
[1:05:37]
entailed into that a little bit but to
[1:05:40]
see the breakdown of what it takes to
[1:05:42]
get everything over to Brady would be
[1:05:44]
one thing. Just as a reminder from
[1:05:46]
everything about 13th Street, I'm
[1:05:48]
talking east, so east of Buckeye. From
[1:05:51]
13th Street um to about the fifth,
[1:05:54]
fourth and fifth street area, there are
[1:05:55]
no very limited drainage structures.
[1:05:58]
Basically, when the town was designed,
[1:06:01]
it was designed for gravity flow
[1:06:03]
downhill until it reached the plateau of
[1:06:06]
flat area of the fourth and fifth street
[1:06:08]
and then it makes its way on its own.
[1:06:09]
Um, so helping guide it into structures
[1:06:13]
um would probably help take away some of
[1:06:15]
the downflow that all ends up down in
[1:06:18]
the areas of fourth and fifth. And I was
[1:06:20]
told that those areas um flooded the
[1:06:23]
other night again. I don't know if it
[1:06:24]
was Thursday night um
[1:06:27]
>> be Friday. Friday night. So, but I know
[1:06:29]
that there was high water. I'm sitting
[1:06:31]
down there again because I heard from a
[1:06:33]
resident um that uh
[1:06:35]
>> was on Fourth and Fifth Street.
[1:06:37]
>> Yeah. Around 1:00 a.m. uh couldn't get
[1:06:40]
to their residence for a little bit. And
[1:06:42]
it does reach car doors and everything
[1:06:44]
down in there very easily. And I know it
[1:06:46]
gets up into yards. Have we had any into
[1:06:49]
um foundations yet? That that I don't
[1:06:51]
know. But um I know um it's been awful
[1:06:55]
close. on that one. Uh the fourth and
[1:06:57]
fifth street, if we do uh put in more
[1:07:00]
structures, will that um southeast
[1:07:02]
drainage project, that tube that's
[1:07:05]
perhaps undersized and collap
[1:07:08]
>> it's all going to head to that area. So,
[1:07:10]
I mean, you you pick your poison on how
[1:07:12]
much you want to do at a time.
[1:07:14]
my and maybe I'm wrong, but my initial
[1:07:16]
thought is start at the river and work
[1:07:17]
your way backwards because if it's if it
[1:07:20]
uh you know and of course unfortunately
[1:07:22]
that's the largest price project, but if
[1:07:24]
you if you can't get it to flow out at
[1:07:26]
the highest limits, all you're going to
[1:07:27]
do is continue to condense it. Can you
[1:07:29]
carry it away a little bit better with
[1:07:32]
local drainage? Probably. Yeah. But
[1:07:34]
ultimately, it's still all got to flow.
[1:07:37]
>> What's the timing on getting those
[1:07:39]
opinions of probable cost?
[1:07:40]
>> I don't know. Jared got that last one to
[1:07:42]
us within the two week time period or
[1:07:44]
so.
[1:07:47]
>> Yeah.
[1:07:48]
>> Okay. So, I think it'd be helpful. Yeah.
[1:07:49]
I think it'd be helpful to have both of
[1:07:51]
those uh just to kind of see and if it's
[1:07:54]
something that we want I mean you kind
[1:07:56]
of mentioned just a little bit ago that
[1:07:57]
you'd like to see some costs on several
[1:08:00]
of the different projects on what it
[1:08:02]
would take. Um, I mean, if we're willing
[1:08:05]
to spend a little bit of money for
[1:08:07]
investigation purposes without doing a a
[1:08:10]
full lot of engineering,
[1:08:11]
>> I think we have to
[1:08:12]
>> we we can gladly just have them start
[1:08:14]
working on all of them in my opinion.
[1:08:16]
So,
[1:08:17]
>> I think you got to open the hood and
[1:08:19]
that's where it starts. I think you have
[1:08:21]
to use a part of what we got in the fund
[1:08:24]
now, part of the 600,000 and open it up
[1:08:26]
to engineering to figure out to hatch a
[1:08:29]
plan. Yeah. We've got to start somewhere
[1:08:31]
and we've got to open the hood and we're
[1:08:33]
not qualified to do so. So, an engineer
[1:08:36]
would have to be the one to do that,
[1:08:37]
>> right?
[1:08:38]
>> That'd be the uh the list that's been
[1:08:41]
identified in addition to
[1:08:43]
>> with the summit. Yeah. Yeah. And uh like
[1:08:47]
I said, if you guys are good with that,
[1:08:48]
um however you want to handle it, but
[1:08:50]
and giving us permission to go ahead and get all those
[1:08:57]
uh five slash six areas kind of an area
[1:09:00]
of probable cost, I guess, at this
[1:09:02]
point. And
[1:09:03]
>> timing wise, I mean, we're at the end of
[1:09:05]
July, so it's not like we're in October,
[1:09:07]
November already where this would go
[1:09:09]
into effect in, you know, a month or
[1:09:10]
two. We've got time still to get those
[1:09:14]
>> guys. I just think $2 million is
[1:09:16]
ridiculous. I don't I mean, there's five
[1:09:17]
homes there. I'm not sure those five
[1:09:18]
homes are worth $2 million.
[1:09:21]
>> But you got to open the hood up to see
[1:09:23]
what it is. And if we get an engineer to
[1:09:25]
actually do a legitimate study on it and
[1:09:28]
if it's $2 million after he does it and
[1:09:31]
looks deeper into it, then that's
[1:09:33]
something that gets de prioritized. But
[1:09:35]
we got to have a number on everything
[1:09:36]
else though. At least a an estimate,
[1:09:39]
whether it's a $500,000 to $2 million
[1:09:42]
estimate. At least we have an idea of
[1:09:45]
how can we start knocking these things
[1:09:46]
off the list. That's where we start
[1:09:48]
making the plan is we open the hood, we
[1:09:51]
have an engineer look at these, get a
[1:09:54]
cost associated with them, and then
[1:09:56]
that's how we can prioritize our list.
[1:09:58]
>> Yeah. My opinion.
[1:09:59]
>> And I and I just I can see some of the
[1:10:01]
things that kind of can take place up
[1:10:03]
there in that area. You know, you got a
[1:10:04]
lot of backyards, you got a lot of
[1:10:06]
landscaping, you got a lot of fencing.
[1:10:08]
If you're if you're excavating and
[1:10:10]
placing in new, you're going to have
[1:10:12]
easement costs. You're going to just all
[1:10:14]
the little things are going to add up.
[1:10:15]
And and I think I I'd like to keep
[1:10:19]
reminding that just because we've got a
[1:10:20]
water line or a sewer line or a storm
[1:10:22]
water drain that needs replaced, when
[1:10:24]
they fall within the street area, you're
[1:10:26]
talking street basically brand new
[1:10:28]
street replacement costs. And those
[1:10:30]
costs are extremely expensive right now
[1:10:34]
um with asphalt prices and everything
[1:10:35]
else. So you're you're talking about the
[1:10:37]
whole um part of the plan just to get
[1:10:41]
something replaced underground that you
[1:10:43]
don't visibly see. You have to refix the
[1:10:45]
surface. So I mean some of those costs
[1:10:47]
can add up there. That's just a reminder
[1:10:49]
for you.
[1:10:51]
>> We'll bring back those opinion follow
[1:10:52]
construction costs
[1:10:55]
the ones that are identified as
[1:10:56]
priorities by the commission plus the
[1:10:58]
summit one uh to you. We have the one on
[1:11:03]
um the south drainage area. They've
[1:11:05]
already studied that in depth. So, I
[1:11:07]
don't think we should ask them to to
[1:11:09]
redo that. Just the other ones. We can
[1:11:11]
bring that back to you probably in a
[1:11:12]
month. Um, we'll ask Jared with Olsson
[1:11:16]
what he thinks is doable based on their
[1:11:18]
schedule and timing and then we can
[1:11:21]
bring that back. There's, like I said,
[1:11:23]
we're not recommending that whatever you
[1:11:25]
implement, whether that be KMU's uh
[1:11:28]
schedule, um the over three years or the
[1:11:32]
more aggressive all at once, we don't
[1:11:34]
recommend that take effect till January
[1:11:36]
so people can plan for it and budget for
[1:11:38]
it. So, you have some time. Um what we
[1:11:42]
need to know really for planning
[1:11:44]
purposes is which one you're looking at.
[1:11:48]
uh because yeah, they all get there at
[1:11:50]
the same over a different period of
[1:11:52]
time. But if you if the commission says,
[1:11:54]
you know, we're going to do the
[1:11:56]
alternate two, the one up front, well
[1:11:58]
then we know starting in 2027, we can
[1:12:01]
pretty much count on this much rep and
[1:12:03]
we can start planning with those
[1:12:05]
numbers. Uh as opposed to over three
[1:12:07]
years, then we're limited. We have to
[1:12:09]
start building them. That's what we're
[1:12:10]
asking for. It's just uh which route you
[1:12:14]
think you're going to go, which
[1:12:15]
implementation schedule it's most about.
[1:12:18]
>> And when you uh talk with Olsson, you
[1:12:20]
might have them um not completely
[1:12:24]
revisit the southwest or southeast
[1:12:26]
drainage project, but see how it affects
[1:12:29]
the others. Like I know the fourth and
[1:12:31]
fifth street one,
[1:12:31]
>> right,
[1:12:32]
>> is upstream from that. So how they
[1:12:35]
affect each other and and what their
[1:12:37]
opinion is on that.
[1:12:39]
>> We can do that. Is it going to cause
[1:12:40]
more problems down there if we open it
[1:12:42]
up?
[1:12:42]
>> Right.
[1:12:43]
>> Yeah.
[1:12:45]
>> Or is it at least get it underground to
[1:12:47]
where it's not you're [clears throat]
[1:12:48]
not having as as bad as surface
[1:12:50]
flooding? I don't know. A little more
[1:12:53]
capacity if you can at least get it
[1:12:55]
underground.
[1:12:56]
>> Do we have a an idea of which
[1:12:59]
implementation schedule you're looking
[1:13:01]
at or do you want to wait until you see
[1:13:04]
all those costs?
[1:13:06]
>> I think I would wait to see all the
[1:13:08]
costs. I would I'd like to see have an
[1:13:10]
idea of what it's going to cost and then
[1:13:12]
we can have the engineer say this one's
[1:13:14]
going to be the most effective and then
[1:13:16]
go from there.
[1:13:17]
>> Most effective to what though? I mean
[1:13:20]
for
[1:13:20]
>> valuewise.
[1:13:21]
>> Okay.
[1:13:22]
Impacting the most correct
[1:13:24]
>> residents.
[1:13:25]
>> Yeah.
[1:13:25]
>> Okay. Most impactful to
[1:13:27]
>> citizens. Absolutely. To the Yeah. To
[1:13:30]
alleviate
[1:13:31]
>> Okay.
[1:13:31]
>> The most amount of potential property
[1:13:33]
damage.
[1:13:34]
>> He may be able to get it done sooner,
[1:13:35]
but we'll probably plan on a month. It
[1:13:36]
probably be at the end of August,
[1:13:38]
beginning of September.
[1:13:39]
>> But we've got plenty of time.
[1:13:41]
>> Okay.
[1:13:41]
Thank you very much.
[1:13:49]
» Okay. Our next item is 7D, discussion
[1:13:51]
and direction regarding the city manager
[1:13:53]
search request for proposals. Inter city
[1:13:55]
manager Quinn Day.
[1:13:56]
>> Yeah. The purpose of tonight's item is
[1:13:58]
for the commission to review the
[1:13:59]
responses received for the RFP for
[1:14:02]
recruiting a city manager. Um before you
[1:14:05]
begin your discussion, I did want to
[1:14:07]
briefly walk through the evaluation
[1:14:09]
report that was included in your packet.
[1:14:11]
Uh it was intended to summarize the
[1:14:13]
evaluation process, explain how the
[1:14:15]
proposals were reviewed, and provide
[1:14:17]
information to assist you in determining
[1:14:19]
how it how you would like to proceed
[1:14:21]
with the recruitment. Um page one is
[1:14:24]
just the executive summary provides an
[1:14:26]
overview of the process, who responded
[1:14:28]
and the overall evaluation results. Then
[1:14:32]
we have a background um explains why we
[1:14:35]
did it and
[1:14:37]
what was from staff's understanding from
[1:14:40]
the commission important uh the emphasis
[1:14:42]
on qualifications recruitment
[1:14:44]
methodology due diligence and
[1:14:46]
stakeholder engagement. Then we go into
[1:14:48]
the responses received. It identifies
[1:14:51]
the re the firms that submitted
[1:14:53]
proposals. We did receive eight seven we
[1:14:56]
considered respon
[1:15:01]
the league was the non-responsive one
[1:15:03]
and they did advise they could not
[1:15:04]
provide the comprehensive recruitment
[1:15:06]
services requested and instead submitted
[1:15:08]
a limited recruitment assistance
[1:15:10]
proposal um because they did not respond
[1:15:13]
to the requested scope of work. It was
[1:15:15]
not included in the evaluation.
[1:15:17]
The report also notes that Austin Peters
[1:15:20]
Group declined to submit a proposal.
[1:15:22]
Um, if you turn to page three of the
[1:15:27]
RFP, you'll find the evaluation criteria
[1:15:30]
and that was municipal executive
[1:15:32]
recruitment experience, city manager
[1:15:34]
recruitment experience, due diligence
[1:15:37]
methodology, recruitment methodology,
[1:15:39]
public engagement approach, project team
[1:15:42]
qualifications and cost.
[1:15:44]
Then you have the evaluation summary. Uh
[1:15:48]
from those based on those criteria um
[1:15:51]
GMP consultants received a score of 96,
[1:15:55]
Colon Basinger and Associates 94, MGT
[1:15:58]
88, Cleur Professionals 87, GPS 85, WBCP
[1:16:04]
83, and then Bob Marine Associates 78.
[1:16:08]
What was not included in the packet was
[1:16:10]
the cost uh for each proposal that was
[1:16:13]
put on your desk along with the uh
[1:16:15]
composite scores. Uh and then the
[1:16:18]
proposed timing. Uh the schedule
[1:16:21]
anticipates the commission discussion
[1:16:23]
that this evening hopefully um
[1:16:27]
you direct interviews with a short list
[1:16:29]
of firms uh
[1:16:32]
by the August 10th meeting or if you
[1:16:34]
choose just one, we can move forward as
[1:16:36]
far as
[1:16:38]
getting a professional service
[1:16:39]
agreement. So what we're asking the
[1:16:41]
commission to do is to have a discussion
[1:16:44]
and u eventually select a recruitment
[1:16:47]
firm and authorize preparation of the
[1:16:49]
professional service agreement. One
[1:16:51]
thing that I did note in what I sent to
[1:16:53]
the commission um earlier in the week so
[1:16:56]
you had time to review all of those 498
[1:16:59]
pages that came was that uh another
[1:17:01]
option would be for uh the recruitment
[1:17:04]
to be handled in house using uh staff
[1:17:07]
and
[1:17:10]
got pretty qualified. Yeah.
[1:17:14]
» Okay.
[1:17:16]
>> So, that first one, the GMP,
[1:17:19]
I one of the things that kind of stuck
[1:17:21]
out to me when looking through theirs
[1:17:22]
was they're extremely heavy in the
[1:17:24]
Pacific Northwest and they don't I mean,
[1:17:26]
I think the furthest east they ventured
[1:17:28]
is maybe one or two searches in
[1:17:31]
Colorado.
[1:17:33]
>> I guess what
[1:17:35]
do you have any insight into? Does that
[1:17:37]
really limit us on,
[1:17:39]
you know, I guess this area or
[1:17:42]
>> No, because I I believe that most of
[1:17:44]
them do their um advertising and their
[1:17:47]
recruitment from the same fishing holes.
[1:17:49]
Uh whether they're they focus in uh the
[1:17:54]
Pacific Northwest or the East Coast, a
[1:17:56]
lot of them will do recruitments in
[1:17:58]
other areas. Largely, they'll focus in
[1:18:01]
those areas because they're familiar
[1:18:03]
with those people in that area. that's
[1:18:05]
where they're they're housed out of.
[1:18:08]
But, uh, ideally, if you have somebody
[1:18:10]
that's from the Midwest, that's
[1:18:11]
preferable because they're more familiar
[1:18:13]
with the people that they're going to be
[1:18:15]
[clears throat] trying to get here. I do
[1:18:18]
know that, uh, John Deirof did spend
[1:18:20]
quite a bit of time on the phone calling
[1:18:23]
people, uh, saying, "Hey, there's an
[1:18:25]
opportunity for you."
[1:18:28]
So, he just didn't put ads out in the
[1:18:30]
paper. He was doing some calling and
[1:18:32]
trying to get people out.
[1:18:34]
But no thank
[1:18:37]
» was that when they were doing the search
[1:18:39]
or was that here recently?
[1:18:41]
>> What's that
[1:18:41]
>> for? When did he make those phone calls?
[1:18:44]
>> Uh that was during the last search.
[1:18:45]
>> During the last search. Gotcha.
[1:18:48]
>> Yeah. I think uh what might have been
[1:18:50]
missing and what we added to this one
[1:18:53]
was the uh the vetting and the public
[1:18:55]
engagement portion.
[1:19:01]
As far as my ranking, I went through and
[1:19:04]
read a majority of the 437 page
[1:19:08]
RFP
[1:19:10]
responses. Um, Colin Bainger, uh, I had
[1:19:14]
them as my had that firm as my number
[1:19:17]
one. They had a great warranty. They
[1:19:20]
really had a good price guarantee, too.
[1:19:23]
Uh, good search process. They all had
[1:19:25]
good search processes and they were all
[1:19:27]
very good. But what stuck out to me with
[1:19:30]
them is the fact that they were so
[1:19:34]
staunch on their reputation and um said
[1:19:37]
they get it done at at that price
[1:19:40]
regardless of what it cost them. Um my
[1:19:43]
second choice would be Clear uh Career
[1:19:46]
Professionals. Um they're localish
[1:19:50]
Midwest Oklahoma got a podcast. I think
[1:19:53]
that's a unique avenue to recruit and
[1:19:57]
find uh city managers. Um I liked GPS
[1:20:01]
also. Uh they have a former Kansas guy
[1:20:03]
on their staff. They placed um Salina
[1:20:07]
Junction and have done a lot in in
[1:20:10]
Kansas. Um I steered away from GMP
[1:20:15]
because they were all Pacific Northwest
[1:20:17]
for the most part. Same thing with MGT.
[1:20:21]
um they didn't travel much further east
[1:20:24]
than Montana. Um and I didn't really see
[1:20:27]
much in in WBCP or Bob Marie as far as
[1:20:32]
compatibility with regionality or um
[1:20:35]
experience in our areas.
[1:20:38]
So that was my list.
[1:20:53]
» Yeah. My my I guess when I was going
[1:20:55]
through them too, my top was that Ben
[1:20:58]
Colin Benzinger, however you want to
[1:20:59]
pronounce that.
[1:21:00]
>> Yeah, that's my one.
[1:21:01]
>> And then um I think we just had our
[1:21:04]
second and thirds flipped. I think I had
[1:21:05]
GPS and then clear career if I remember
[1:21:08]
correctly. I didn't. I should have
[1:21:10]
numbered them on here.
[1:21:12]
[snorts]
[1:21:25]
» Did you say in-house is a possibility?
[1:21:27]
Is that what you said? And what would
[1:21:30]
that look like? like we just have our
[1:21:32]
staff find us a city manager.
[1:21:38]
» Okay. Yeah. I mean I kind of like that
[1:21:40]
idea that
[1:21:43]
>> you still have cost associated with that
[1:21:47]
checks.
[1:21:48]
>> Okay.
[1:21:50]
on
[1:21:52]
city negotiations,
[1:21:55]
which I believe you did the last.
[1:22:00]
What do you think a timeline on that
[1:22:02]
would be? Would that be something that
[1:22:03]
we can give that a shot internally and
[1:22:06]
um save $30,000
[1:22:08]
and put a timeline on it? And if that
[1:22:11]
doesn't turn up any good candidates then
[1:22:15]
we can revisit with interviewing um you
[1:22:20]
know using this existing
[1:22:22]
results
[1:22:24]
and interviewing the three companies. I
[1:22:26]
don't know the job.
[1:22:33]
» I don't know that we'd be able to give
[1:22:34]
you, hey, we're doing great on
[1:22:36]
recruiting folks because we'd have to
[1:22:38]
come up with the same thing that the um
[1:22:40]
these firms would be. What are your
[1:22:41]
priorities uh as a manager? Maybe they
[1:22:44]
haven't changed a lot. What do you
[1:22:46]
what's the salary going to be? What are
[1:22:48]
the educational requirements? Is there a
[1:22:50]
residency requirement? Package that up,
[1:22:52]
send it out, and then how long do we
[1:22:54]
give them? Then we give them 30 days to
[1:22:56]
respond. Uh, and then we said, "Hey,
[1:22:59]
we're not getting anything. I'm not sure
[1:23:01]
these bids would still be good."
[1:23:02]
>> Yeah.
[1:23:04]
That's what I was asking. That's
[1:23:05]
what I was curious on.
[1:23:09]
>> Yeah. And I kind of I kind of like
[1:23:11]
having a third party involved just to I
[1:23:14]
mean, [clears throat] you had mentioned
[1:23:15]
there's a warranty aspect to it as well.
[1:23:18]
Um, and I think they have the I mean
[1:23:20]
they have the real world experience of vetting these candidates and really
[1:23:24]
digging into them.
[1:23:25]
>> Yeah.
[1:23:26]
>> Not saying staff couldn't do that, but
[1:23:28]
they I mean they do this dayto day
[1:23:30]
>> and the network to find them,
[1:23:32]
>> right?
[1:23:32]
>> That's huge.
[1:23:33]
>> I think it would open up our pool a
[1:23:36]
little bit, but it's kind of like
[1:23:38]
publishing things in the or putting
[1:23:39]
notifications in the newspaper. It's a
[1:23:41]
third party record. And kind of the same
[1:23:43]
thing here. you get a third party to
[1:23:44]
kind of I guess weed through a lot of
[1:23:46]
that for you.
[1:23:47]
>> Well, and they probably keep track of,
[1:23:49]
you know, who's getting close to or
[1:23:51]
getting ready to move
[1:23:53]
[snorts and clears throat] on or
[1:23:54]
>> things like that. So,
[1:23:55]
>> yeah,
[1:23:56]
>> who to go after,
[1:23:57]
>> right? Yeah, they have a lot of inner knowledge as far as the that
[1:24:04]
world, especially u you know, uh GPS. I
[1:24:08]
mean, they deal almost strictly with
[1:24:10]
city officials. So,
[1:24:12]
>> yeah. I think you mentioned that that
[1:24:14]
one of them was former city manager
[1:24:15]
camp,
[1:24:16]
>> right? Yep. Yep.
[1:24:17]
>> And I believe they're both attorneys
[1:24:19]
now,
[1:24:20]
>> Commissioner Taylor. Um I think I had
[1:24:23]
WBCP a little bit higher. Were they on
[1:24:25]
Did they make your list?
[1:24:26]
>> They did not.
[1:24:27]
>> Okay.
[1:24:27]
>> I did not have ABCP on on mine. I had um
[1:24:31]
Banezinger one and you could probably
[1:24:35]
put clear career and GPS type for two.
[1:24:38]
That was kind of where I was sitting. I
[1:24:40]
think WB CP was my fourth.
[1:24:51]
And I think honestly I think the only
[1:24:53]
reason they were my fourth was just
[1:24:54]
because it was a lot of add-ons.
[1:24:57]
Um which could be beneficial if we're
[1:24:58]
not needing all of them. It could lower
[1:25:00]
their cost a little bit
[1:25:02]
>> unless we end up needing them all.
[1:25:04]
>> It's kind of like 50/50 on additional
[1:25:06]
expenses and they were
[1:25:08]
>> kind of the low
[1:25:09]
>> Yeah. low cost out of the gate and it
[1:25:11]
seems like they're very qualified. I
[1:25:13]
don't think there's any question about
[1:25:15]
competency. I was just kind of curious
[1:25:16]
if you had a
[1:25:17]
>> right
[1:25:18]
>> reason why they didn't rank higher.
[1:25:23]
» I think no, nothing really stuck out. I
[1:25:27]
was I was looking for a lot of regional
[1:25:30]
um experience just because I want them
[1:25:32]
to know
[1:25:34]
um I don't know, I guess who we are, I
[1:25:37]
guess. So, I was looking for that.
[1:25:38]
That's why I eliminated a couple of
[1:25:40]
those West Coast firms
[1:25:43]
and that's why I bumped up um
[1:25:47]
Clear and GPS so high because I know GMP
[1:25:50]
looked fantastic too, but them just
[1:25:52]
being on the West Coast, I mean that's
[1:25:54]
just my internal rankings.
[1:25:57]
>> Yeah,
[1:25:58]
it's no fault of them and it knocked
[1:26:00]
them down a few pigs for me too.
[1:26:02]
>> Yeah.
[1:26:02]
No, it's a great firm. just
[1:26:06]
I feel like having local knowledge is
[1:26:08]
important.
[1:26:09]
>> You think I mean I guess doing a Zoom
[1:26:12]
interview with four of them is that
[1:26:15]
excessive.
[1:26:17]
>> I think three would be like I don't
[1:26:20]
know. I'd like to do fewer if possible.
[1:26:24]
>> Going to say this. I'd have to agree
[1:26:25]
with Commissioner Kohhoff. Three would
[1:26:26]
be the fewer the possible.
[1:26:28]
>> Mhm.
[1:26:33]
» [clears throat]
[1:26:37]
» I did just pull up their list. They've
[1:26:38]
got a bunch of states. WBCP has a bunch
[1:26:40]
of states, but it's six people outside
[1:26:43]
of the state of California. [laughter]
[1:26:45]
There's like one person in Idaho, one
[1:26:47]
person.
[1:26:48]
>> That's Yeah, that's probably why they
[1:26:50]
didn't make mine.
[1:26:56]
It seemed like Benzinger was definitely
[1:26:59]
one that we'd want to consider.
[1:27:01]
>> Yeah, for sure.
[1:27:04]
>> Would you want to do the interviews
[1:27:05]
during the August 10th meeting or
[1:27:07]
schedule a special meeting so that focus
[1:27:09]
just on that and they're not back to
[1:27:11]
back. For example, if you're
[1:27:13]
interviewing all say three, you schedule
[1:27:16]
30 minutes for each same regular
[1:27:18]
meeting. It's a regular meeting. Well, I
[1:27:21]
guess any meeting, but uh they could
[1:27:23]
listen into your interviews.
[1:27:26]
>> You can't interview them in executive
[1:27:27]
session.
[1:27:30]
>> Uh no, because they would not be
[1:27:32]
employee personnel that we're hiring.
[1:27:34]
They're independent contractors. So, it
[1:27:35]
would need to occur in an open public
[1:27:37]
setting. And the rule is if any portion
[1:27:40]
of our meeting is televised, the
[1:27:42]
entirety of that meeting needs to be
[1:27:44]
televised. If you wish to have a special
[1:27:47]
meeting for this purpose so as to
[1:27:49]
preclude interviewed candidates from
[1:27:51]
seeing the responses from those who go
[1:27:54]
before them, you could do that with the
[1:27:55]
plan of not televising any portion of
[1:27:57]
that meeting.
[1:27:58]
>> We could do a study session also.
[1:28:01]
>> Yeah.
[1:28:02]
>> Yes. If it it would be a separate
[1:28:04]
meeting uh apart from any other
[1:28:08]
regular meeting that's televised. Yes,
[1:28:11]
you could call it a study session. Mhm.
[1:28:12]
Well, I guess I'm saying our study
[1:28:14]
sessions aren't televised if I I guess I
[1:28:15]
don't know why we wouldn't necessarily
[1:28:16]
want this to be televised unless there's
[1:28:18]
something that they don't want to be
[1:28:19]
televised. I guess um I'm not sure if
[1:28:22]
that's the case.
[1:28:23]
>> I don't think they'd have a problem with
[1:28:24]
it. Just if the other people were
[1:28:26]
watching, so if I'm WCBP and I'm third
[1:28:30]
to be interviewed, I might want to watch
[1:28:31]
the other two. And
[1:28:33]
>> I think that's all fair.
[1:28:35]
>> Yeah,
[1:28:38]
I'd go Bayinger for sure. Um, and then I
[1:28:43]
don't Deb Amy, what are your thoughts on
[1:28:46]
two and three? I, like I said, I'm clear
[1:28:49]
career and GPS. Those are my
[1:28:51]
>> That's where I was at.
[1:28:52]
>> I'm good with those, too.
[1:28:53]
>> Okay. Do you want to set up interviews
[1:28:55]
for those three?
[1:29:00]
» I'd be fine with that.
[1:29:02]
>> Yes, please.
[1:29:02]
>> Sounds good.
[1:29:03]
>> Special special meeting or during the
[1:29:05]
August 10th meeting? Let's do
[1:29:08]
I I don't
[1:29:09]
>> I'm no preference
[1:29:11]
>> was kind of having trouble. It just hit
[1:29:13]
me that they're going to go like one
[1:29:14]
bang bang bang, right? So having that
[1:29:15]
televised like
[1:29:16]
>> arguably the third one might have some
[1:29:18]
benefit.
[1:29:20]
>> So I think from that perspective I think
[1:29:22]
>> study sessions the way to go
[1:29:24]
>> off camera.
[1:29:24]
>> Yeah. Or you just have it under August
[1:29:26]
10th study session.
[1:29:27]
>> That's what we were alluding to and that
[1:29:29]
not to say that's right or wrong but
[1:29:30]
that's a consideration uh for you if
[1:29:33]
you're going consecutive interviews.
[1:29:35]
they noticed we were favoring this
[1:29:37]
aspect over a different one, they could
[1:29:38]
kind of tailor theirs real quick to
[1:29:41]
>> Yeah, I think that is going to give us
[1:29:43]
better information too.
[1:29:44]
>> Study session then
[1:29:46]
>> August 10th.
[1:29:47]
>> Yeah, let's do it.
[1:29:48]
>> Um,
[1:29:50]
do you want to just be a free interview,
[1:29:52]
have them introduce themselves and their
[1:29:54]
philosophy and then you can ask
[1:29:55]
questions based on that or do you want
[1:29:57]
to have set questions?
[1:30:00]
>> We'd want to have it to be interactive.
[1:30:02]
>> Yeah. Are we assuming they're all going
[1:30:04]
to be on Zoom or are we planning for in
[1:30:06]
person or Zoom?
[1:30:08]
>> I would guess Zoom.
[1:30:09]
too. Yeah,
[1:30:11]
>> I think we would just I think we should
[1:30:12]
just set it up as Zoom and not give them
[1:30:13]
the option that way.
[1:30:14]
>> Yeah, they'll be in the room.
[1:30:16]
>> The travel costs aren't associated with
[1:30:17]
it.
[1:30:18]
>> Yeah.
[1:30:19]
>> And then just have just tell them that
[1:30:20]
uh you'd like to interview them and they
[1:30:23]
can start by introducing themselves and
[1:30:24]
>> Yeah.
[1:30:25]
>> Uh then you guys can ask questions. How
[1:30:28]
long
[1:30:29]
>> would they anticipate?
[1:30:31]
Uh, I would think I mean 30 minutes
[1:30:33]
>> 30 minutes
[1:30:34]
>> piece we could leave
[1:30:34]
>> that would be good
[1:30:36]
>> 20 minute interview with a 10-minute gap
[1:30:40]
>> between
[1:30:42]
definitely want to leave a little gap
[1:30:43]
just to
[1:30:44]
>> Yeah, I would think that' be fine.
[1:30:46]
>> Do you want to see what they I mean is
[1:30:47]
there a
[1:30:48]
>> Yeah. Do they have to remember what we
[1:30:50]
did on there
[1:30:51]
>> industry standard pitch time? I guess
[1:30:53]
they have
[1:30:54]
>> sure. I don't last time with you guys uh
[1:30:58]
the last recruitment you just selected
[1:31:00]
uh
[1:31:00]
>> yeah we didn't interview
[1:31:02]
>> I just didn't know if there was a
[1:31:08]
» hey 30 minutes apart
[1:31:09]
>> we 30 minutes with 10 minutes in between
[1:31:12]
so that way if you guys want to discuss
[1:31:13]
something if you're done discussing it
[1:31:15]
we can pick up the phone and say are you
[1:31:16]
ready and dial them in
[1:31:18]
>> yeah I think so
[1:31:19]
>> just ask them to be ready in this window
[1:31:22]
right Okay.
[1:31:24]
>> And just to be clear, uh, Basinger,
[1:31:27]
Clear, Clear, and GPN,
[1:31:29]
>> correct?
[1:31:30]
>> Thank you.
[1:31:38]
» Is this going to be at the study session
[1:31:40]
after the regular meeting on August?
[1:31:42]
>> Yes. Make that agenda light.
[1:31:44]
>> Okay. Because we'll have to we won't
[1:31:46]
have a definite start time depending on
[1:31:48]
how long the agenda is either to give
[1:31:49]
them either if it's after a meeting.
[1:31:51]
>> Yeah.
[1:31:53]
I mean technically if they if we had to
[1:31:56]
if something came up they could adjourn
[1:31:59]
uh or recess the uh regular meeting and
[1:32:02]
then come back if they had to.
[1:32:04]
>> Okay,
[1:32:06]
>> that was a good thought too, Shannon.
[1:32:08]
Hadn't thought of that. So
[1:32:11]
>> um next item under heading eight new
[1:32:14]
business is 8A. Consider scheduling a
[1:32:16]
joint meeting with the Abene Public
[1:32:17]
Library Board. Yeah, this is just to
[1:32:19]
gauge whether or not the city commission
[1:32:21]
would like to schedule a joint meeting
[1:32:23]
with the libraries board to discuss
[1:32:25]
issues that have been discussed recently
[1:32:27]
between city staff uh library staff and
[1:32:31]
the library board. The uh beginning on
[1:32:34]
pages 98.99 of your packet, we summarize
[1:32:37]
the recent correspondence between city
[1:32:39]
staff and the library board regarding
[1:32:41]
the interpretation of the 2011 lease
[1:32:44]
agreement, the statutory budget process
[1:32:46]
for the library, uh the ordinance which
[1:32:48]
establishes the maximum levy and the
[1:32:51]
respective responsibilities of city
[1:32:53]
commission. Um
[1:32:56]
you may ask well why a joint meeting?
[1:32:58]
Well, the lease agreement specifically
[1:33:00]
recognizes that issues concerning the
[1:33:03]
application of the agreement uh may
[1:33:05]
arise and provides that unresolved
[1:33:07]
issues may be addressed through a joint
[1:33:09]
meeting of both boards. Uh the intent of
[1:33:12]
the meeting would to bring everybody
[1:33:14]
together at the same table so both
[1:33:16]
governing bodies uh have the same
[1:33:18]
information, can ask each other
[1:33:20]
questions and develop a common
[1:33:21]
understanding moving forward. Um, the
[1:33:24]
recommendation for a joint meeting
[1:33:27]
between the two governing bodies should
[1:33:29]
not be viewed as suggesting that either
[1:33:31]
party is right or wrong. Rather, it
[1:33:34]
flect city staff's belief that matters
[1:33:36]
involving shared governance are best
[1:33:38]
resolved through open discussion among
[1:33:39]
all parties rather than continued
[1:33:41]
written correspondence back and forth.
[1:33:44]
Um, proposed topics which they can be
[1:33:46]
anything that you and the library board
[1:33:48]
uh choose, but staff would recommend
[1:33:51]
reviewing the lease agreement.
[1:33:53]
clarifying the respective
[1:33:54]
responsibilities of the city and the
[1:33:56]
library under the lease. Reviewing the
[1:33:59]
statutory budget process applicable to
[1:34:01]
the library fund. Uh reviewing the
[1:34:04]
ordinance establishing the maximum levy
[1:34:06]
and then develop a shared understanding
[1:34:08]
of these matters moving forward. for the
[1:34:10]
governing body's supposed to understand
[1:34:12]
and then uh Wendy and I and other staff
[1:34:16]
Cara and Carrie I mean case we all have
[1:34:19]
a shared understanding
[1:34:22]
and since that's 15year-old agreement
[1:34:24]
it's I think it's good that it's
[1:34:26]
revisited and the boards get together
[1:34:28]
and decide how you want that to look.
[1:34:30]
Um,
[1:34:32]
so our recommendation is if the uh
[1:34:35]
library board, I believe they're still
[1:34:36]
all here, uh, would like to is for us to
[1:34:39]
schedule a joint meeting, uh, at a
[1:34:42]
mutually agreeable date, time, and
[1:34:44]
agenda and then, um, we'll develop an
[1:34:48]
agenda focus on those topics.
[1:34:51]
Any that's something you'd be interested
[1:34:53]
in doing?
[1:34:55]
Yeah, that would be would you like to be
[1:34:57]
a regular study session or a special uh
[1:35:00]
meeting focus just on that?
[1:35:03]
>> What uh I'm curious what the library
[1:35:05]
board might have in mind. Would you want
[1:35:07]
to do that as part of a regular meeting,
[1:35:10]
regular study session? I'm open to
[1:35:13]
whatever works for you guys. Yeah, if we
[1:35:14]
do a regular study session, we'd have
[1:35:18]
to wait until the 24th of August
[1:35:22]
because this that next the 10th would be
[1:35:25]
pretty much eaten up with the
[1:35:26]
>> the interviews
[1:35:27]
>> interviews. Is there I mean is there a
[1:35:30]
time?
[1:35:31]
>> No, there's no hurry that
[1:35:32]
>> I was going to say there's nothing to
[1:35:34]
[clears throat]
[1:35:36]
I would say a study session on the 24th
[1:35:39]
if you guys are
[1:35:42]
open. Does that work?
[1:35:45]
works for me. My schedule study session
[1:35:47]
on the 24th.
[1:35:49]
>> Does that work for you guys?
[1:35:51]
>> Yep.
[1:35:52]
>> Yeah.
[1:35:53]
>> Uh does the agenda topics
[1:35:57]
are they okay with everybody? Something
[1:35:59]
we need to add?
[1:36:03]
I envision that I would ask the city
[1:36:05]
attorney to review the lease agreement.
[1:36:09]
Then we would discuss the statutory
[1:36:11]
budget process.
[1:36:14]
Then uh discuss the uh maximum levy.
[1:36:17]
Then we open it up to just a discussion
[1:36:21]
between the two boards.
[1:36:23]
>> Staff will sit back and
[1:36:25]
>> does that cover everything that the
[1:36:26]
library wanted to discuss.
[1:36:31]
» Thank you. Can always amend our agenda
[1:36:33]
on the day of if something pops up.
[1:36:34]
>> That works for me. In a study session,
[1:36:37]
it'll be a lot of back and forth and
[1:36:40]
might bring up new topics anyways. Yeah.
[1:36:44]
>> 11. So there's
[1:36:49]
» Yeah.
[1:37:00]
» Sounds like a plan.
[1:37:01]
>> Yeah. Yeah. Thanks.
[1:37:02]
>> And we're going to interview people or
[1:37:04]
you will and then on the uh 24th meet
[1:37:07]
with the library board. Yeah.
[1:37:08]
>> Yep. And then in September, we'll bring
[1:37:10]
you some opinions of problem
[1:37:11]
construction costs for I believe it's
[1:37:14]
seven identified plus
[1:37:18]
>> summit.
[1:37:18]
Thank you.
[1:37:19]
>> Yeah, 17th.
[1:37:21]
>> Northwest 17th.
[1:37:22]
>> 17th and
[1:37:24]
>> yeah, thank you.
[1:37:25]
>> I can only think of Gary. That's
[1:37:28]
>> it is Gary Void.
[1:37:29]
>> Yep.
[1:37:34]
Okay. Do we have anything to add with
[1:37:36]
the department reports that were
[1:37:37]
included in the backup?
[1:37:39]
>> I did. I forgot. So, no.
[1:37:40]
>> Okay.
[1:37:42]
We have nothing further. I'd
[1:37:43]
consider a motion to adjurnn.
[1:37:46]
>> Motion to adjurnn.
[1:37:48]
>> Second.
[1:37:49]
>> Motion has been moved and seconded. Do
[1:37:51]
we have any commission discussion?
[1:37:54]
>> Seeing none, we'll do a roll call vote.
[1:37:55]
Vice Mayor Taylor.
[1:37:56]
>> Yes.
[1:37:56]
>> Commissioner Koloff.
[1:37:57]
>> Hi.
[1:37:58]
>> Commissioner Lidle.
[1:37:59]
>> Yes.
[1:37:59]
>> Commissioner Meisenberg?
[1:38:00]
>> Yes. myself.