Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:07]
Evening and thank you for coming out on
[0:10]
a really miserable evening. My name is Dean
[0:14]
Charter I'm vice chair of the select board
[0:16]
and I'm chairman of the public works building
[0:19]
committee. This will actually be a this is
[0:24]
a posted meeting of the public works building
[0:26]
committee. We have a quorum of our members
[0:30]
here present at the table. I'll have them
[0:33]
introduce themselves in a moment. And we'll do
[0:38]
the presentation, question and answers. And then certainly
[0:42]
everybody's welcome to stay around as long as
[0:44]
you want with lots of questions we hope
[0:46]
there are and at the end of that
[0:50]
we'll just be having a brief committee meeting
[0:52]
just to set up future agendas and to
[0:56]
accept some minutes from our last meeting which
[0:59]
was way back in March. So let me
[1:05]
just do a brief self introduction as you
[1:09]
know who I am and other committee members.
[1:14]
We will start with Tom if you just
[1:15]
want to introduce yourself. Hi everybody I'm Tom
[1:19]
Beach and I'm the assistant town manager. Mike
[1:22]
Harris public member. Adam Noldy a member of
[1:26]
the Finance Committee and Land Stewardship Committee for
[1:29]
the town of Acton. Corey York the DPW
[1:32]
Director. Okay thank you. Let me before I
[1:42]
introduce the town manager, let me just give
[1:45]
you a little brief background of my own
[1:49]
interest in this project which might clarify my
[1:54]
passion for getting this thing done. I spent
[2:01]
time in the present building from 1972 until
[2:05]
2015. Neither all or part of my day
[2:09]
was spent in that building, and I pretty
[2:11]
much know every inch of it inside and
[2:14]
out. There were a couple of issues which
[2:17]
we'll be discussing in more detail but I'll
[2:22]
give you my own personal experiences that I've
[2:24]
had with it in the years that I
[2:25]
was there. Air quality issues were terrible in
[2:30]
the building. Constant infiltration of diesel fumes and
[2:35]
everything else coming from the work areas and
[2:38]
into the office areas. And frankly, the ventilation
[2:42]
for the folks in the workshop was awful
[2:44]
as well. One amusing thing happened years ago
[2:48]
was that the highway department pick up the
[2:50]
occasional roadkill, and they throw in the back
[2:53]
of the dump truck and bring it back,
[2:54]
and eventually it would be disposed of. Well,
[2:56]
one time they picked up a dead skunk
[2:59]
and parked it outside the building and went
[3:02]
in for lunch. Of course, that was right
[3:04]
by the air intake for the entire office
[3:05]
area. So they cleaned the office area out
[3:09]
pretty well. So air quality is was a
[3:13]
constant problem. There's been discussion about the wisdom
[3:18]
behind keeping equipment inside as opposed to outside
[3:21]
and we'll get into that in more detail
[3:23]
but I'll give you one example of why
[3:26]
it's worthwhile keeping in equipment in a secure
[3:31]
climate resistant enclosure. In my watch in 1990
[3:38]
we purchased a brush band at 100 brush
[3:40]
chipper. Expected life on those in normal operations
[3:44]
about fifteen years. It was finally sold two
[3:49]
years ago traded in still in operating condition
[3:53]
thirty years of service. That's how much longer
[3:57]
a piece of equipment will last if it's
[3:59]
properly properly maintained and properly secured from the
[4:03]
elements. I don't know we still have them
[4:06]
down there but for a number of years
[4:09]
we had a bunch of nineteen eighty seven
[4:11]
Mac dump trucks which are still operation. So
[4:13]
that's one of the rationales that I have
[4:18]
for wanting to keep equipment properly safe and
[4:21]
secure. Employee recruitment and retention. In my career,
[4:31]
we had a number of opportunities to hire
[4:33]
female groundskeepers and tree climbers. And we were
[4:37]
able to get some very good ones. But
[4:39]
frankly, it's really tough, hiring female workforce which
[4:43]
is an increasing portion of the workforce in
[4:47]
the green industry if there are absolutely no
[4:50]
facilities whatsoever for women and no room for
[4:52]
them. No lockers no showers. So that's a
[4:57]
tough situation. And finally there's been discussion about
[5:02]
does engineering really need to be in that
[5:04]
building? You know can't you just rent some
[5:06]
space somewhere else and have them work remotely?
[5:12]
Engineering was in that building from 1969 when
[5:15]
it opened until 1987 when we moved them
[5:17]
up here when we renovated Town Hall. I
[5:20]
worked alongside them for those years. They stayed
[5:25]
either in Town Hall or over the Red
[5:27]
House for a number of years and a
[5:28]
couple of years back 2020 they moved back
[5:32]
down to to public works and the increase
[5:37]
in efficiency and command and control was breathtaking.
[5:42]
The difference, having the opportunity for an interface
[5:47]
between engineering and the folks that are actually
[5:50]
doing the work really increased the efficiency. When
[5:54]
you look at the very modest amount of
[5:57]
space we're talking about from the engineering department,
[5:59]
I think it's will pay many benefits. So
[6:04]
those are just a couple of my war
[6:06]
stories. I've got plenty of them if you've
[6:08]
lots of time. I will kick it over
[6:11]
to the town manager. Thank you, Dean. I'm
[6:20]
John Mangioradi. I'm the town manager. I've I've
[6:23]
worked here for six years, more than six
[6:26]
years, actually, and, this is a subject that
[6:28]
was discussed early on, when I arrived here.
[6:32]
Thank you to Dean's leadership of this effort.
[6:35]
Thank you to members of the billing committee.
[6:38]
It's it's been a lot of work to
[6:40]
get to where we are now. I'm also
[6:41]
gonna introduce members of the project team. I
[6:44]
wanna thank members of the audience that are
[6:46]
here. There's about, 20 maybe people here. There's
[6:49]
eight or nine people watching from home, and
[6:52]
hopefully, people will also watch this, later when
[6:55]
it's recorded. Just a programming note, if you
[6:57]
are at home, there'll be a point later
[7:00]
in the session where you can raise your
[7:01]
hand, and we'll we'll connect with you, to
[7:04]
ask a question or or or have a
[7:06]
comment, but not not till, the presentation is
[7:09]
concluded. So in addition to the, project, committee
[7:13]
that already introduced themselves, we have some staff
[7:16]
members that are involved with it. We also
[7:20]
have a the architecture and design team is
[7:22]
Weston Sampson, who you'll hear from in a
[7:25]
little bit. PMA consultants is our project manager.
[7:28]
They every every public construction project needs to
[7:31]
have three parties. The owner, which is the
[7:34]
town, the designer, which is Weston and Sampson,
[7:37]
and then the owner's project manager, which is
[7:39]
PMA. And their job is to help us
[7:42]
work with the architect to make sure that
[7:46]
the project is done efficiently and cost effectively
[7:49]
and appropriately. So we have a really good
[7:52]
team and we have a presentation to talk
[7:56]
about what we've done so far. I wanted
[7:58]
to also mention that this website has been
[8:04]
created actinma.gov/dpwfacility all one word. And so that
[8:11]
information about the project including this presentation will
[8:15]
be published there in addition to the materials
[8:18]
that are already on that web page. So
[8:21]
I think before we bring up Weston and
[8:23]
Sampson, think actually Dean, we had you programmed
[8:26]
to take on the next slide, which gives
[8:29]
us some more background, which I think many
[8:32]
of you have been following along this project.
[8:34]
But many of you this is your first
[8:35]
night hearing about it. And so before we
[8:38]
dive into the details of design, we wanted
[8:41]
to take a few minutes and just talk
[8:42]
about how we got to this point. So
[8:44]
thank you. Thank you. So you I've explained
[8:57]
to you my interest in the building and,
[8:59]
you know, why I've been pushing toward towards
[9:02]
getting this done. And I think it's important
[9:05]
to understand that this is a group effort.
[9:08]
It's something that's been embraced by the select
[9:10]
board. The, going back as far as 2020,
[9:15]
we've always had something to do with this
[9:17]
Public Works Building on our short term and
[9:20]
long term goal list. And, those are published.
[9:26]
They're a guidance document not only for the
[9:29]
select board but also for town staff to
[9:31]
know what we're moving towards. So starting very
[9:37]
early just with a feasibility study then the
[9:41]
getting moving ahead on the design of new
[9:45]
public works silly prioritizing existing fuel station in
[9:50]
twenty twenty two twenty three construction department public
[9:53]
works building and then most recently bring the
[9:56]
DPW facility project to town meeting in May
[9:59]
of twenty twenty five and that's what we're
[10:01]
moving ahead with now. The next slide. Yep.
[10:07]
So this is what we've done since then
[10:10]
in an attempt to secure those goals. We
[10:15]
did have a feasibility study, that is all
[10:18]
available online. We had a facilities feasibility study
[10:23]
committee that reviewed that study and they made
[10:28]
their presentation back in October of twenty two
[10:32]
basically embracing the conclusions of the feasibility study.
[10:37]
And we did some tours of the building
[10:40]
we did have subsequent to the feasibility study
[10:45]
committee going through and making their recommendation we
[10:48]
did go back to town meeting in May
[10:50]
of twenty three and '1 point '2 '2
[10:53]
million dollars was allocated for the design of
[10:56]
the building. Subsequent to that we formed a
[11:00]
new committee that you see here which had
[11:03]
many of the same members but slightly different
[11:05]
focus. We did secure funding to build a
[11:12]
new public works fuel depot on the site.
[11:17]
The existing fuel depot is basically right in
[11:19]
the middle of the site and would create
[11:22]
some problems building the new facility, plus which
[11:26]
the tanks that were in the ground are
[11:28]
close to the end of the service life.
[11:29]
So it was going to have to be
[11:30]
replaced anyway. So first step is get that
[11:34]
piece of infrastructure out of the way and
[11:37]
then in July we did embrace this as
[11:40]
a short term goal to bring this to
[11:42]
town meeting and at this point I will
[11:47]
back off and let the experts talk. Thank
[11:49]
you. Thank you Mr. Charter. Thank you members
[11:57]
of the building committee and the town administration
[12:00]
DPW and the public. This is the agenda
[12:04]
for what we're going to present tonight. We're
[12:07]
going to delve a little bit further into
[12:10]
why a new facility is required or needed
[12:12]
for the town. Some of the project challenges
[12:15]
that we'll face. What are these benefits and
[12:19]
opportunities that a new facility will allow? Where
[12:24]
we are in terms of what we've completed
[12:26]
to date, and that is from the July
[12:28]
when we started the schematic design process through
[12:31]
tonight. What's left to do in schematic design?
[12:36]
And what's the proposed future schedule for the
[12:39]
project? Next slide please. So why a new
[12:44]
facility? Hopefully everyone's had a chance take a
[12:48]
look or visit the facility. I know Corey
[12:52]
has offered tours, I'm sure that he would
[12:55]
be happy to walk people through to take
[12:57]
a look at the facility as it is
[12:59]
today. Next slide please. The DPW is the
[13:04]
backbone of the community. They are first responders.
[13:09]
They are out on the roadways before other
[13:13]
first responders can get out on the roadways.
[13:15]
So they're out clearing the roads so that
[13:18]
the fire trucks, the police department, ambulances can
[13:23]
all assist the town. The departments are in
[13:28]
the DPWR, the administration and engineering, and these
[13:31]
are departments that will be housed at the
[13:34]
new facility. The highway department, trees and grounds,
[13:40]
fleet maintenance, they repair all the town trucks.
[13:44]
The facility would also support other department operations
[13:48]
such as cemeteries, recreations, operations, conservation and emergency
[13:54]
response. A larger facility could also assist with
[13:58]
some town functions such as they do now
[14:03]
with hazardous waste drop off day. Hopefully we
[14:06]
don't have to have a pop up health
[14:08]
clinic like we did during COVID again, but
[14:11]
a new facility would assist with that as
[14:14]
well. Next slide, please. This slide showing how
[14:19]
to dissuade day twenty twenty four. Next slide,
[14:22]
please. Again, first responders, some of the functions
[14:26]
that are provided by the DPW snow and
[14:29]
ice removal, hurricane, windstorm cleanup, removal of road
[14:32]
hazards, road repairs, support of other emergency departments.
[14:38]
Something to notice that, you know, if there's
[14:40]
a blizzard on Christmas Eve, they're out there
[14:43]
twenty four hours taking care of the roads.
[14:47]
Thank you. Next slide. The history of the
[14:51]
facility was, you know, this facility has been
[14:53]
on the site since 1970. Know, fifty years
[14:58]
ago, or over fifty years ago, another group
[15:00]
was sitting here talking about that facility, the
[15:03]
size it needed to be. Ultimately, was constructed
[15:07]
at 19,000 square feet, although the original recommendation
[15:10]
was 36,000 square feet. Total cost $10.62 a
[15:15]
square foot. Kind of wish we could get
[15:18]
that today. Next slide, please. Why do we
[15:22]
need a new facility again? The town, even
[15:25]
during the 60s, by the time that 1970
[15:27]
facility had opened, the town population had exploded.
[15:31]
Number of roadways, miles had increased. It's increased,
[15:34]
the population has increased 10,000 since then. The
[15:38]
size of the trucks has increased. If you
[15:40]
look at a truck from 1970, you look
[15:42]
at a truck 2024, they're vastly larger today.
[15:46]
They have a larger plow attachment. The building
[15:50]
is too small. The number of, and types
[15:55]
of equipment has increased as well. So, you
[15:59]
know, the small facility has negative impacts in
[16:02]
terms of response time, employee safety and training,
[16:06]
health and safety of the employees, vehicle and
[16:10]
equipment, longevity, and increased maintenance requirements. Requirements. Next
[16:14]
slide please. The Dean mentioned indoor air quality.
[16:21]
There weren't a lot of codes back then
[16:23]
that dealt with stuff that we deal with
[16:26]
today. Concerns about health, employee health, indoor air
[16:31]
quality is a huge factor. Know, today in
[16:36]
this facility, they open the doors, turn on
[16:39]
a fan. There's no gas detection there's no
[16:43]
automatic ventilation to evacuate poisonous gas from the
[16:47]
space there is no HVAC system that keeps
[16:52]
and segregates fumes into one area and doesn't
[16:56]
allow them to migrate into office areas impacting
[17:00]
employee health. It's uninsulated, it's difficult to heat,
[17:07]
it's inefficient, structurally it's deficient, it is failing.
[17:13]
Next slide please. A of, so you know,
[17:20]
a lot of people will say, well, why
[17:21]
don't we rehab this building? Why don't we
[17:23]
try to work with it? It must be
[17:26]
cheaper to renovate this building rather than build
[17:28]
something new. Not necessarily. A public works facility
[17:34]
is considered by the building code to be
[17:36]
a category four structure, meaning it needs to
[17:40]
withstand the heaviest and most severe lateral forces.
[17:45]
It can't fall down during an earthquake or
[17:49]
heavy winds or hurricane. It has to stand
[17:51]
because of its vital importance to serve the
[17:53]
community as a, you know, for their role
[17:57]
as a first responder, similar to a police
[17:59]
department, similar to a fire department. In order
[18:03]
to get this building to perform in that
[18:06]
level category four, the structural improvements that would
[18:10]
be required would be cost prohibitive. And at
[18:14]
the end of the day, the volume of
[18:16]
the building is too small, it's still uninsulated,
[18:19]
it would still, it would be a costly
[18:22]
renovation that would end up with a building
[18:25]
that is inadequate for the money. Next slide,
[18:30]
please. Here are some examples of the structural
[18:33]
deficiencies. This is unreinforced concrete masonry block, meaning
[18:38]
that there's no rebar running vertically through the
[18:42]
cells of the block, tying it to the
[18:44]
roof structure, tying it to the foundation. So
[18:48]
when there's settling, when there's lateral movement, building
[18:52]
can fall down. Next slide please. Interior conditions
[18:58]
are substandard for the employees. There's inadequate space
[19:03]
for training. Top left photo is of their
[19:07]
meeting room, muster room, kitchen, conference room. Serves
[19:12]
all those purposes, but it's undersized for the
[19:13]
number of staff that they have. So they
[19:15]
can't train everyone in that room or even
[19:18]
half of their staff in that room. They
[19:20]
need to do training in the garage area.
[19:22]
It was mentioned there aren't any facilities or
[19:24]
locker rooms for women. This is a picture
[19:26]
of the men's locker room. One shower in
[19:30]
the entire building and it's pretty gross and
[19:33]
not used any longer. And this is not
[19:36]
a reflection on the efforts of the DPW
[19:40]
staff to upkeep the building. They have worked
[19:43]
incredibly hard to maintain what they have. It's
[19:48]
just getting more and more difficult to keep
[19:51]
up with it. The carpentry shop again, there's
[19:54]
dust, there's noise directly adjacent to admin staff.
[19:59]
And we have recycle bins in the lobby
[20:02]
of the admin office because there's really no
[20:04]
other place for them. Next slide please. This
[20:08]
is some pictures of mezzanine storage. Storage is
[20:12]
at a premium. These mezzanines were built at
[20:16]
some point in time. They certainly don't meet
[20:19]
OSHA safety requirements. It's not clear what they're
[20:25]
of they're rated for in terms of loading
[20:27]
and there's little headroom because they weren't, you
[20:29]
know, it's not a true two story space.
[20:33]
So you have electrical wiring, lighting and sprinkler
[20:37]
piping running at eyesight level on the mezzanine
[20:40]
which is dangerous. The stairs are open treads,
[20:44]
open risers and they don't meet current code.
[20:47]
Next slide please. This is an, you know,
[20:52]
again, spaces at a premium. You find room
[20:56]
where you can. Clearances are impacted. Ability to
[21:02]
circulate through the space is impacted, which is
[21:04]
dangerous. There's tripping hazards. There's no room for
[21:11]
workshop space, which is kind of jammed against
[21:13]
walls, but then directly adjacent to the vehicle
[21:17]
maintenance areas. It's very chaotic and they do
[21:21]
make do. Space isn't tall enough to fully
[21:25]
lift a large vehicle. A large vehicle can
[21:28]
be 13 feet from the floor to the
[21:30]
dump, top of the dump, and you really
[21:34]
need about 20 clear feet of space without
[21:37]
interference to get that vehicle up five, six
[21:40]
feet in the air, and they can't do
[21:42]
that. Next slide please. Storage outdoors is accommodated
[21:49]
in temporary shipping containers in a kind of
[21:54]
makeshift storage canopy area, which is starting to
[21:58]
rip and will need to be replaced shortly.
[22:00]
But that's where a lot of the lawn
[22:01]
equipment is stored right now. And then other
[22:04]
storage is kind of scattered on the periphery
[22:07]
of the site where space can be found.
[22:10]
Next slide please. This is the interior storage
[22:16]
garage. Dean mentioned the longevity of some of
[22:20]
these pieces of equipment. The reason that they've
[22:23]
lasted this long is because the DPW staff
[22:26]
makes a monumental effort to get these vehicles,
[22:30]
these very expensive town assets, indoors and out
[22:33]
of the elements. They can't get everything inside.
[22:36]
This is only 9,000 square feet. So there
[22:39]
is kind of like a game of Jenga
[22:42]
that takes place every day to stack the
[22:47]
equipment, make sure that the equipment that's prioritized
[22:51]
for work the next day is in the
[22:53]
right spot to get out. But if there's
[22:55]
a need to get a piece of equipment
[22:57]
that's buried, you may have to move seven
[22:59]
or eight vehicles to get that to that
[23:02]
piece of equipment to get it out, into
[23:05]
the yard. The plows that you see on
[23:07]
the top right corner, they they can't be,
[23:10]
typically, the best thing to do is, especially
[23:12]
during winter snow fighting operations, is to keep
[23:15]
the plow on your truck, bring it into
[23:17]
a a semi heated space, and you're ready
[23:20]
to go. At the end of a storm
[23:23]
event, to get the vehicles back inside, they
[23:26]
have to drop the plows outside. So keeping
[23:29]
that outside, they rust, the hydraulics become sluggish,
[23:33]
the hydraulic hoses become cracked, there's increased maintenance,
[23:37]
increased replacement cycle and cost. Next slide please.
[23:46]
Project challenges. Yes, I want to introduce Stella
[23:51]
Donahue, who's a sustainability specialist with Weston and
[23:54]
Sampson, and she'll continue the presentation. Hello, So
[24:02]
this project involves a handful of challenges. You
[24:06]
saw the existing conditions, I'll go over a
[24:10]
few main challenges for this project. Next slide,
[24:13]
please. So this, the approach for the design
[24:16]
is phased so we can maintain the DPW
[24:19]
operations during construction. So if you can imagine
[24:22]
building a new facility while trucks are maneuvering
[24:26]
the existing site, it's quite a challenge. So
[24:29]
there's the existing DPW building, there's the salt
[24:32]
shed, various outbuildings, and then all that truck
[24:37]
circulation from the DPW, but also the transfer
[24:41]
station at the south of the site. So,
[24:44]
also some large roll off trucks dropping off
[24:48]
the the waste coming up that drive, backing
[24:53]
into the ramp to dump the waste. So
[24:56]
all the while, building a new facility in
[24:59]
a phased approach while avoiding having to find
[25:04]
a site where temporary facilities can get can
[25:09]
maintain the operations during during construction. This allows
[25:12]
both to to go simultaneously. So, we've identified
[25:16]
this sort of purple hatch at the top.
[25:20]
That's where phase one can begin while the
[25:24]
DPW can remain operable during the process. Next
[25:28]
slide. Another aspect of challenges relates to the
[25:33]
energy goals. This town is beautiful and forward
[25:36]
thinking, so it is a stretch energy code
[25:39]
town. And and moreover, it's a higher tier
[25:43]
called the opt in specialized energy code, so
[25:46]
it's a stricter set of energy code requirements.
[25:51]
They also adopted a bylaw where any new
[25:56]
municipal building needs to be fossil fuel free.
[26:00]
And this project also anticipates the future fleet
[26:04]
electrification. So taking into consider into consideration space
[26:09]
needs and the infrastructure required to build that
[26:13]
in now so that down the road when
[26:15]
fleet turns over to electric, it can be
[26:18]
a more seamless process instead of having to
[26:20]
totally retrofit that space at that time. So
[26:24]
trying to be flexible and forward thinking. Next
[26:27]
slide. Another challenge, if you can imagine a
[26:32]
conductor for a symphony, we have a bunch
[26:35]
of underground systems that need to be coordinated.
[26:37]
So your stormwater drainage, managing the stormwater as
[26:42]
well as septic on-site, your electric utilities, and
[26:47]
this project is also pursuing geothermal wells. I
[26:51]
think upwards about 40 wells that have to
[26:54]
be 30 feet spaced out in diameter. So
[26:58]
there's a whole bunch of different systems being
[27:01]
coordinated under underground to make sure everything runs
[27:04]
smoothly. Next slide. So a handful of challenges,
[27:10]
but that also means there's a whole bunch
[27:12]
of opportunity and benefits that can come with
[27:14]
the modern new facility. Next slide. Primarily, a
[27:21]
new facility would allow for a great improvement
[27:25]
to operations in terms of efficiencies, safety, health,
[27:31]
occupant health, user comfort. So with the indoor
[27:36]
storage, we discussed that can increase the lifespan,
[27:39]
greatly reduce the maintenance needs versus being stored
[27:43]
outdoors in in New England's weather. Also, the
[27:48]
introduction of a wash bay which I'll get
[27:50]
into that can help to maintain the equipment
[27:53]
to wash off any salt corrosive conditions and
[27:57]
also prolong the lifespan of of these very
[28:00]
expensive trucks. A new facility would comply with
[28:03]
codes and regulations like the bylaw I mentioned
[28:07]
and building energy codes and OSHA. There could
[28:13]
also be a handful of, spaces in the
[28:17]
new building that other agencies in town can
[28:20]
use. So meeting space for, board committee meetings
[28:24]
like this. John touched on it, but and
[28:29]
Dean that this could greatly increase the employee
[28:32]
morale, training opportunities, and and pride for, working
[28:37]
for the town with the DPW. And then
[28:42]
just the simple fact that a new facility
[28:44]
could meet the demands of today, but also
[28:46]
for the next fifty to seventy five years.
[28:48]
Next slide. These are a handful of photos
[28:53]
of some example projects that show a more
[28:57]
modern today's standard facility. Top top left image
[29:02]
there is the training room. So that type
[29:04]
of space could be used during storms for
[29:06]
storm operations center. There's there's some consideration for
[29:14]
renewable energy that we're exploring, like the geothermal,
[29:17]
and this facility also will have roof solar.
[29:21]
And then the bottom left image, that's an
[29:23]
example of indoor fleet storage garage. And running
[29:27]
along the right side is mezzanine space. So
[29:30]
ample storage, which could be used by other
[29:35]
departments in town as well. I believe the
[29:38]
DPW currently stores some overflow material for other
[29:43]
departments like cemetery and conservation. So, those mezzanine
[29:48]
spaces are are, very beneficial for DPW and
[29:52]
the town as a whole. Next slide. Here
[29:57]
are a few other images of a a
[29:59]
modern facility. That center photo on the top,
[30:03]
the wash bay. Like I said, this can
[30:05]
help to wash off, corrosive salt buildup and,
[30:11]
again, prolong the life of these trucks, but
[30:13]
it's also a really great benefit for the
[30:16]
environment. The runoff gets filtered down and held
[30:20]
into a sump and disposed of properly versus
[30:25]
it running off into the environment, the landscape
[30:29]
around the site, which is maybe what's happening
[30:33]
now. And then the bottom right image that's
[30:38]
fluid containment. So if there's any spill, it's
[30:41]
contained with some curbing. Also minimizing the risk
[30:45]
for contamination and spills. Next slide, please. And
[30:52]
here's an example at site scale. It's worth
[30:55]
noting this is not a flashy building. It's
[30:59]
it's designed and built for its use. It's
[31:02]
it's rooted in functionality, so it's there's no
[31:07]
really frills beyond what it's serving, its purpose.
[31:11]
It has high volume spaces for the maintenance
[31:14]
to allow those large trucks to be lifted
[31:17]
and maintained with ease and efficiency. There's site
[31:22]
security and separate visitor and staff circulation. So
[31:28]
there's a safety and site circulation and improvements
[31:34]
as a whole to the site, to the
[31:36]
environment, stormwater management, and really just allowing for
[31:43]
a more smooth operational process. Next slide. And
[31:49]
another area of opportunity is for Acton DPW
[31:53]
to lead by example and really steward this
[31:56]
sustainable thinking, complying with the bylaw for one,
[32:01]
and improving stormwater, which correlates to the water
[32:05]
quality in town. There's also an opportunity to
[32:11]
work with Mass Saves rebate program. So by
[32:15]
pursuing these geothermal wells and, really maximizing on
[32:20]
energy efficiency, there's upwards of $2,300,000 in incentives
[32:26]
by running through this program, and that's just
[32:29]
for geothermal wells. There's there's other opportunities beyond
[32:32]
that. So there's some cost benefits in terms
[32:36]
of sustainability, and a facility like this can
[32:40]
can also lend to community resilience as a
[32:43]
whole. Next slide, please. This next section, I'll
[32:49]
give an update on, the work completed to
[32:52]
till today, really. So starting in mid July,
[32:56]
we conducted a review and confirmation process. This
[33:00]
is to confirm the program if there have
[33:04]
been any changes since this study a few
[33:07]
years prior to make sure we're capturing all
[33:10]
the facts and figures. So I I really
[33:14]
identify the key drivers for the program as
[33:17]
the users, the staff, the visitors, the public
[33:20]
interaction, as well as the fleet inventory, so
[33:23]
all the the trucks and equipment, trailers. So
[33:28]
you we take account of all the administrative
[33:31]
staff, the, workforce, any future considerations for vacancies
[33:36]
or future growth, and then how that translates
[33:40]
to locker room count, parking needs, etcetera. Next
[33:44]
slide, please. This is an overview. We confirmed
[33:50]
our understanding of the existing site. Just a
[33:52]
quick run through here. We have the DPW
[33:55]
Building in the salt shed and a few
[33:59]
storage buildings and containers surrounding the site in
[34:02]
the blue. There's a bit of storage creeping
[34:07]
beyond that that's left uncovered in the red.
[34:11]
So, all the plows we had mentioned. In
[34:14]
the orange is material bins. So, your gravel
[34:17]
and loam And then the green kind of
[34:21]
running the perimeter of the site and of
[34:24]
the building is your parking provisions, which is
[34:29]
also interfacing with that that purple dash line
[34:31]
which is representing the site circulation. So if
[34:35]
you're a visitor coming on to site, you
[34:37]
may be fighting with the truck circulation which
[34:42]
tends to be quite unsafe and and not
[34:46]
ideal. So, it's a bit chaotic. You have
[34:50]
few areas of building access in the purple
[34:53]
arrows. So those are overhead garage doors. Ultimately,
[34:59]
it's doing the best they're doing the best
[35:01]
they can but it is a bit choppy
[35:05]
site currently. Next slide, please. The review and
[35:10]
confirmation, we looked at the existing program, which
[35:16]
covers the building but also those areas of
[35:18]
storage efforts on-site. So the the building, the
[35:25]
storage building, the containers, and all those areas
[35:28]
without coverage. In comparison to the proposed program,
[35:33]
of course, it is an increase and a
[35:35]
bulk of that is the fleet storage garage
[35:38]
and a little rationale behind that is it
[35:41]
is about three times the size of what
[35:44]
you have what they have currently. But the
[35:48]
rationale is that there's these two rows on
[35:50]
either side of the garage with angled parking
[35:53]
and a center drive aisle. So that really
[35:56]
helps to improve your response time, the organization,
[36:01]
safety, and all the while, minimally conditioned. It's
[36:06]
it's not set to this room. It's it's
[36:09]
about 50 degrees. And it's it's also the
[36:12]
cheapest per square foot space to build in
[36:14]
these types of facilities. So it's it's, a
[36:18]
major benefit for for not the most costly
[36:23]
in terms of a new VPW facility. Next
[36:26]
slide, please. So once we confirmed our program,
[36:31]
we rolled into a conceptual design shred, which
[36:34]
looked at various approaches to a phased building
[36:39]
plan. So ultimately, we discussed the benefits of
[36:45]
the first phase, including both the fleet maintenance
[36:49]
and the fleet storage. So about two thirds
[36:51]
of the building can be constructed in phase
[36:55]
one. This also allows benefits like using that
[36:59]
fleet storage space for temporary shop facilities and
[37:04]
then coming back in to complete the building
[37:06]
with the phase three. Ultimately, the DPW decided
[37:12]
on a preferred alternative. Next slide, please. And
[37:16]
I'll just walk us through the process of
[37:18]
how this could look. So the image on
[37:20]
the left, the maintenance in the wash bay
[37:24]
and the fleet storage portion of the facility
[37:28]
as well as a canopy off the backside
[37:30]
of the salt shed could be built during
[37:33]
this time. Also at this time, we would
[37:37]
put together a privacy screen along the abutters
[37:42]
to help with noise and and headlights. Once
[37:46]
the building is demoed during phase two, we'll
[37:50]
introduce temporary facilities, so some trailers. And at
[37:54]
that point, the little orange box in the
[37:56]
fleet storage garage is a represents the the
[38:00]
temporary fit out for shop functions. Next slide,
[38:04]
please. So with the existing DPW building removed,
[38:10]
then the construction can shift to complete the
[38:15]
project with the shops, the employee facilities, and
[38:18]
the offices and so, the image on the
[38:20]
right there represents what a completed facility could
[38:23]
look like with with its parking and landscape
[38:26]
design as well. Next slide. So during this
[38:31]
time, we've also engaged with our engineers, the
[38:35]
the site civil group, our environmental group, and
[38:38]
industrial group. They've done their wetland delineation, some
[38:42]
geotech borings, and test pits. The industrial equipment
[38:46]
group has met with the mechanics to inventory
[38:49]
their equipment and tools, and they're working on
[38:51]
a equipment layout in the schematic floor plan.
[38:56]
We also met with, our rep from Eversource,
[38:59]
Trevor, and our green consultants, the green engineer,
[39:04]
as well as Acton Sustainability Group, our OPM,
[39:09]
and the DPW, and we discussed those mass
[39:12]
save rebates to better understand what that could
[39:15]
look like for this project as well as
[39:17]
potential pursuits for elite certification and just overall
[39:21]
sustainability goals for the project. Next slide please.
[39:26]
And a quick run through of where the
[39:28]
building plans are. So again, phase one is,
[39:32]
your fleet storage garage in the gray at
[39:34]
the top. Purple represents your maintenance base with
[39:38]
the wash bay off the end, as well
[39:40]
as an office for the mechanics and a
[39:42]
restroom facility. This phase is also critical to
[39:46]
include our utility spaces. So just to run
[39:49]
the building, but also provisions for the geothermal
[39:54]
mechanical space. And then just for reference, phase
[40:00]
three is outlined where it would go during
[40:02]
that time as well as the existing building
[40:04]
just to represent how we are we're maintaining
[40:10]
a setback from that building so that trucks
[40:12]
can still maneuver the existing site while this
[40:15]
portion of the facility is being built. Next
[40:17]
slide, please. And then phase three includes building
[40:23]
out the workshop spaces adjacent to the maintenance
[40:27]
and our employee facilities and offices represented with
[40:32]
the orange and the yellow. Next slide, please.
[40:37]
So here are a couple three d graphics
[40:39]
to help kind of understand those those spaces
[40:42]
a bit better. The high volume maintenance space
[40:46]
is, is dictated by a roof eave minimum
[40:50]
height to allow for our overhead doors, but
[40:52]
also all the lifts to be able to
[40:55]
function all the while, staying clear of any
[40:58]
overhead infrastructure like, fire protection, electrical. And because
[41:04]
of this high volume space, we also get
[41:06]
the advantage of building some mezzanine space over
[41:09]
those support rooms on that the far right
[41:12]
side. And similarly with the fleet storage garage
[41:17]
with that center drive aisle, the image on
[41:19]
the right, you can take advantage of that
[41:23]
height with the mezzanine that kinda runs, you
[41:25]
know, the length of that that back wall
[41:28]
And the large room on top of the
[41:30]
mezzanine, that is where we're currently locating that
[41:33]
geothermal mechanical space. Next slide, please. And these
[41:40]
last two images here, the the image on
[41:42]
the left shows a typical workshop fit out.
[41:45]
It's large enough to pull the truck inside
[41:48]
mezzanine space again due to its high volume.
[41:51]
It's premium space for without taking up any
[41:55]
more footprint. And here, this is this has
[41:59]
connection over to the the mezzanine on the
[42:02]
fleet storage side. So plenty of storage space,
[42:06]
which, again, can be maximized by the DPW
[42:09]
as well as some other departments in town.
[42:12]
And then I'll walk you through briefly the
[42:15]
administration block there on the right. So at
[42:19]
the bottom there signifies a public lobby where,
[42:23]
admin can interface with visitors through a service
[42:25]
window running around the perimeters of the building
[42:29]
are private offices and conference rooms. Within the
[42:34]
core of the building are the office support
[42:37]
areas like file storage, a layout space to
[42:40]
look at plans, And then kind of work
[42:44]
going toward the workshops in the rear are
[42:47]
the employee facilities. So spaces like the training
[42:49]
room, the locker rooms. And this this design
[42:53]
includes a a dedicated woman female locker room.
[42:58]
So, definitely can help improve the appeal for
[43:00]
female applicants and then, along the rear with
[43:06]
that does not need window access for daylighting
[43:09]
are your utility spaces. Next slide please. And
[43:14]
John will be closing up the presentation. Thanks,
[43:20]
Stella. Next slide please. So what's remaining for
[43:24]
the schematic design? We are submitting our plans
[43:29]
to our cost estimator and to the OPM
[43:34]
on October 4. Each, we expect about two
[43:39]
week turn, two to three week turnaround to
[43:42]
get the estimate back at which time we'll
[43:44]
reconcile the two estimates with each other. The
[43:50]
schematic design package will then be submitted to
[43:53]
the town which will include schematic level architectural
[43:57]
plans, elevations, sections, details, site civil plans, industrial
[44:02]
equipment plans. We'll have mechanical fire protection, structural
[44:06]
engineering, design narratives, geotechnical report, the schematic design
[44:12]
cost estimate, and the sustainable design narrative. Next
[44:16]
slide please. What's proposed for the schedule moving
[44:21]
forward? Next slide, please. So the goal is
[44:25]
to have the design development permitting and public
[44:27]
outreach occur next. So that's November of this
[44:31]
year through April of next year. We want
[44:35]
to have again at the end of DD
[44:37]
we'll have another cost estimate done by the
[44:41]
OPM and done by our independent cost estimator
[44:45]
which time we'll we'll bring the project to
[44:48]
town meeting for consideration if the project passes
[44:53]
the plan is to have construction occur starting
[44:56]
in the summer of of twenty twenty five
[45:00]
I'm sorry, pardon me. A backup. We'll finish
[45:03]
our construction documents, bid the project in the
[45:06]
fall of twenty twenty five, and then anticipated
[45:11]
two year construction schedule. A little longer than
[45:14]
a typical DPW because of the phasing aspect.
[45:16]
So we'll have to have a little bit
[45:19]
of time to move between phase one and
[45:22]
phase two, bring in temporary facilities, demo the
[45:26]
building, and then come back and complete the
[45:28]
building in the site. Next slide. And thank
[45:33]
you. That's our presentation and we welcome any
[45:37]
questions that you might have. All right. Can
[45:53]
you hear me? First, I had one thing
[45:56]
to say but after seeing the presentation, I
[46:00]
have one more thing to say. I had
[46:03]
a house renovation a few years back and
[46:07]
I thought I had it estimated properly. I
[46:09]
didn't. I have a garage that's starting in
[46:13]
the fall, houses my little John Deere tractor.
[46:17]
It's the smallest diesel tractor. Problem was they
[46:20]
needed my garage to do their cutting and
[46:25]
staining and everything else. So my tractor was
[46:28]
outside. Well, I went out there one day,
[46:32]
started up, and I heard a big bang.
[46:35]
I have some big black walnut trees. The
[46:38]
squirrels decided to store them all under the
[46:40]
hood. They took the fan, broke it, which
[46:44]
went into my radiator. Got that in to
[46:47]
do some work, and they came back and
[46:49]
they said, Oh, the nest is in there,
[46:51]
and the urine has destroyed your wiring. So,
[46:57]
I mean, I can see why you want
[46:59]
to put things inside. Not only that, but
[47:01]
later in the year, when I finally got
[47:03]
it back, and I'm out there snow blowing
[47:05]
my driveway, or I should say I wanted
[47:09]
to, it was really hard to get it
[47:12]
started compared to the old days where I
[47:16]
knew I had to get to the train
[47:17]
station at 06:20, I'd figure out how much
[47:19]
snow we had. I get out there, get
[47:20]
into my garage, turned it, started right up,
[47:25]
and I'm out there doing the work and
[47:26]
getting the work on time. So there's a
[47:29]
lot to say about having equipment inside instead
[47:32]
of outside. But the one point I wanted
[47:35]
to say initially, when I was thinking about
[47:38]
this tonight, is I do a lot at
[47:41]
our senior center. And I talk to the
[47:43]
people there. And back when we were looking
[47:46]
at the operational override. I had a lot
[47:50]
of people as I'm talking to them said,
[47:53]
you know, aren't we redoing the DPW? So
[47:58]
we really don't need this operational override? You
[48:01]
know, I'd rather spend the money on the
[48:02]
DPW site. Now, override passed and now we're
[48:08]
looking at where do we find the money.
[48:10]
So I'm hoping that the finance committee, the
[48:13]
select board, and others list to this and
[48:16]
really work really hard to get that school
[48:19]
budget down, not up, so that we have
[48:23]
the money for the DPW which is necessary.
[48:26]
Thank you. I'm sorry. Leo Fodgman, Wright Terrace.
[48:32]
Anyone else? Hi, I'm Corinne Hogseth. I live
[48:38]
in Indian Village. I had a question about
[48:40]
the geothermal and the solar stuff. I'm wondering,
[48:45]
I know you don't have a cost estimate
[48:46]
yet, but when it comes in, I hope
[48:48]
that we can see what kind of a
[48:50]
premium we're paying for the green part of
[48:53]
it. Thank Yes. And and there is a
[48:57]
premium. And there's that's the reason why there
[48:59]
are the rebates to incentivize spending extra for
[49:03]
that. But there are also paybacks. So that
[49:07]
will be included as well. We're proposing closed
[49:11]
well for the geothermal. There's two types, guess,
[49:15]
closed and open. The close is a bit
[49:17]
more expensive, but it's also more environmentally conscientious
[49:20]
and I know there's a concern in town
[49:22]
for contamination of soils and high conductivity of
[49:28]
waterways so that's the reason for that. I
[49:33]
wrote down my remarks so I wouldn't forget
[49:36]
them or go off script. Hello, Acton friends.
[49:40]
My name is Eric Heals. I am 58
[49:42]
years old, an Air Force veteran, small business
[49:46]
owner, Clock Tower Law, and a long time
[49:49]
Acton visitor and resident. In 1975, I first
[49:54]
visited Acton when helping family friends move from
[49:57]
Andover to Acton's Indian village. In 1983, those
[50:01]
same friends moved to Acton's Robbins Park. In
[50:04]
1995, shortly after graduating from law school, I
[50:08]
first moved my family to Acton. But we
[50:11]
could not afford to buy, so we rented
[50:13]
a ranch in West Acton. In 1996, we
[50:18]
moved to Marlborough again because we could not
[50:20]
afford to buy in Acton, but also because
[50:22]
Marlborough High School students at the time could
[50:26]
attend the newly expanded Acton Boxborough Regional High
[50:29]
School to offset cost of expansion. In 1998,
[50:34]
my work resulted in a two year stint
[50:36]
in Denver, Colorado, but we returned home to
[50:38]
Acton's Minuteman Ridge in February, just before my
[50:42]
oldest child entered first grade. Divorce and remarriage
[50:46]
resulted in two more moves. And since 2013,
[50:50]
Rebecca and I have called 17 Forest Road
[50:53]
home. Now I'm going off script. You've seen,
[50:56]
three houses to the north of Forest Road
[50:59]
on all those overhead slides. Mine is the
[51:03]
northernmost one of those three. 17 Forest Road.
[51:08]
It's the yellow house with the chainsaw bear
[51:11]
out front and the fenced backyard. Together, Rebecca
[51:15]
and I have put five children through the
[51:17]
AB school system, and our youngest, Freddie, is
[51:20]
a senior at ABRHS. I have been a
[51:23]
good steward of 17 Forest, and I have
[51:26]
been a good neighbor to the DPW and
[51:29]
to others. For example, I store a snow
[51:31]
a snow plow on my property for a
[51:34]
Venezuelan friend who plows for the town of
[51:36]
Acton because he is not allowed to store
[51:39]
the plow at his condo. Over the years,
[51:42]
many vehicles have pulled into my driveway or
[51:45]
rung my doorbell looking for directions to the
[51:47]
DPW. And while I live across the street
[51:50]
from the dump, otherwise known as the transfer
[51:52]
station, I have never been to the dump.
[51:55]
I much prefer a Marlborough centralized recycling and
[51:58]
trash system, which, like school buses, is much
[52:01]
more efficient than having thousands of cars do
[52:04]
the same task. And in fact, the only
[52:07]
time I had been to the DPW is
[52:08]
to deliver mail and packages dropped off at
[52:11]
my house by mistake. The DPW, on the
[52:14]
other hand, has not been a good neighbor.
[52:17]
Robins Park families in general and residents of
[52:21]
Hosmer Street and Forest Road in particular already
[52:25]
bear a disproportionate amount of traffic, especially on
[52:29]
Saturday afternoons going to the dump, often speeding
[52:32]
at close to twice the posted speed limit.
[52:35]
And some of the worst offenders are those
[52:38]
who work at or fuel up at the
[52:40]
DPW. The majority of residents on Forest Road
[52:44]
own dogs, and the lack of sidewalks in
[52:47]
the neighborhood combined with the amount and speed
[52:50]
of traffic makes walking with or without dogs
[52:53]
treacherous. I was a cat person for forty
[52:56]
seven years, but our family decided to rescue
[52:59]
a stray dog last year. Her name is
[53:01]
Piper. We walk Piper twice daily and multiple
[53:04]
times per week. We have close calls with
[53:07]
Acton bus, DPW, fire, police, and rescue vehicles.
[53:13]
When driving on the highway, we were all
[53:14]
taught to move over a full lane for
[53:16]
cars on the shoulder. We should all do
[53:19]
the same thing on neighborhood roads. Recently, a
[53:22]
dog was struck by a speeding vehicle on
[53:24]
Minot Avenue, and the dog had to have
[53:26]
one of its legs amputated. Yet when sidewalks
[53:29]
were added to Minot Avenue and Taylor Road
[53:31]
A Few Years ago, the entrance to Forest
[53:34]
Road from Minot Avenue was inexplicably widened, allowing
[53:39]
speeding cars to take that corner even faster.
[53:44]
It's also where the sidewalk ends. The proposed
[53:47]
DPW construction project will add additional noise, traffic,
[53:51]
and danger for already overburdened Robins Park families.
[53:56]
So I believe that much more needs to
[53:58]
be done for the residents of Robins Park
[54:00]
before this construction project starts. The vegetative buffer
[54:04]
referred to on the project website has decreased
[54:07]
in density and effectiveness every year that I
[54:09]
have lived here, most notably due to the
[54:12]
twenty eleven October snowstorm and the September 2023
[54:16]
microbursts, both of which took out many mature,
[54:20]
mostly oak trees. If you lived here, what
[54:23]
would you ask for? Sidewalks, narrowing the forest
[54:27]
Binaught intersection, planting evergreens such as hemlocks, rhododendrons,
[54:31]
or the like on the perimeter of the
[54:33]
vegetative buffer, replacing the always on DPW spotlights
[54:37]
with motion lights, being a better neighbor. I
[54:41]
understand that this project has been in planning
[54:43]
for quite some time, but the first direct
[54:46]
communication that I received about it was Acton's
[54:49]
September eighteenth letter announcing this public meeting. That
[54:53]
was eight days ago. I have been a
[54:56]
good steward of every property that I've ever
[54:58]
owned, and I have been a good neighbor
[54:59]
everywhere I have lived. The town of Acton
[55:02]
can and should do better. Sincerely, Eric Heals,
[55:07]
Actonian since 1995. Thank you. Anyone else? Miss
[55:15]
mister Heal, if you could either email a
[55:20]
copy of your remarks or or hand them
[55:23]
over to us. That's exactly the kind of
[55:26]
input that we wanted and I appreciate the
[55:32]
fact that obviously we're an industrial operation. We
[55:35]
do have impacts on the neighborhood. And these
[55:40]
are the same sort of issues that were
[55:42]
raised with the North Acton Fire Station. So
[55:45]
we worked closely with the neighbors there to
[55:47]
try to do whatever we could to mitigate
[55:50]
the impact of that facility. And certainly, I
[55:53]
hope to do the same with the Public
[55:54]
Works Building. Thank you for your comments. Three
[56:02]
case sorry. I was hit almost twice on
[56:07]
hazardous waste day. Hundreds of cars queued up
[56:11]
outside of my house. I was three you're
[56:14]
shaking your head no that I wasn't hit?
[56:18]
I know what you're Yeah. That's you're saying.
[56:21]
Yeah. Today, walking the dog, in the rain,
[56:26]
three case bus drivers drove by the case
[56:28]
bus drivers, by the way, are the least
[56:30]
bad of the offenders. But two of them
[56:32]
almost hit me today. And so it's a
[56:35]
it's a daily occurrence. I I don't know
[56:37]
if this committee is is coordinating with the
[56:39]
sidewalk committee. Don't know how you prioritize where
[56:42]
the sidewalks go, but if you ever wanna
[56:45]
try to take a a left turn walk,
[56:47]
walking down Forest to Hosmer or to Whittier
[56:49]
or to Forest, man, you take your life
[56:51]
into your hands doing that every day. Hosmer
[56:54]
is even worse. People drive 50 or more
[56:56]
in Hosmer, especially on Saturdays. It's nuts. So
[56:59]
I'd invite you to come over to my
[57:01]
house on Saturday and watch what it's like,
[57:04]
especially around 03:00, four o'clock. And not once
[57:07]
since 1995 have I seen the police pull
[57:10]
anybody over in any residential neighborhood in Acton.
[57:13]
Not once. Come on a Wednesday to see
[57:15]
what it's like with the the noise and
[57:17]
the construction and the and the speeding. And
[57:19]
now you're gonna take half of the trees
[57:22]
away. That's what the plan looked like to
[57:24]
me, about half of the trees. And it's
[57:26]
half of the trees have already come down
[57:28]
in that same area since I've lived there.
[57:30]
I can see the buildings clear as day
[57:32]
from my front yard just as you can
[57:34]
see in my house on all those photos.
[57:36]
And I first found out about this project
[57:38]
eight days ago. Thank you. I just have
[57:56]
kind of one general question. Look at Scott
[58:00]
Sullivan, a Patriot's room. Understanding the presentation with
[58:06]
the gist of it being that the urgency
[58:08]
and need to to have this done and
[58:12]
seeing all the support for that. What I
[58:15]
am confused with is the phased program of
[58:21]
doing this over multiple years, which in my
[58:24]
mind would increase the cost, probably prevent an
[58:29]
urgent response and cause delays on having the
[58:34]
facility operate the way it needs to operate.
[58:37]
And after going to Planet Fitness every morning
[58:39]
and watching a building go up in literally
[58:41]
one month over the summertime. I'm not understanding
[58:45]
why or or maybe you already have an
[58:48]
analysis on if this was built during the
[58:53]
warmer months so that there's no snow or
[58:55]
ice and things could just be done faster
[58:59]
so this could be resolved quicker. I'm hoping
[59:03]
in your final analysis that that is a
[59:05]
scenario that's presented. Maybe just to respond quickly
[59:14]
to that. Mean, we all want the construction
[59:16]
to occur as quickly as possible. The purpose
[59:20]
of the phase plan is to maintain those
[59:23]
operations as best we can. There isn't anywhere
[59:26]
in town to move to on a temporary
[59:29]
basis and that building is in the middle
[59:31]
of the site where we need to build
[59:33]
a new facility, a new site, a new
[59:35]
parking. So unfortunately, we initially thought we could
[59:40]
maybe find an industrial spot where we could
[59:43]
relocate the DPW, but there really isn't any
[59:46]
place in Acton or in Concord or any
[59:50]
in Stowe or any nearby community where that
[59:53]
type of facility would could be found. And
[59:57]
it would be expensive because of the unique
[1:00:00]
needs of the fleet maintenance department. They need
[1:00:03]
to fit out a new space completely. So
[1:00:05]
the purpose of the phasing itself is to,
[1:00:09]
it mainly based around those needs because we
[1:00:11]
need to get fleet maintenance up and running
[1:00:14]
in a new facility and kind of seamlessly
[1:00:16]
transition them and that will maintain those operations
[1:00:20]
as best as possible. The building type that
[1:00:24]
is most economical for a DPW that provides
[1:00:27]
these very long spans, it's called a pre
[1:00:29]
engineered metal building. There's always a lag time,
[1:00:34]
unfortunately, between the time you can get one
[1:00:37]
of those buildings into production. There's a lot
[1:00:40]
of review back and forth of shop drawings,
[1:00:43]
coordination of utilities, and so forth. So from
[1:00:47]
the time that the building is ordered until
[1:00:49]
delivered and constructed, there's a pretty significant lag
[1:00:53]
in time. We still think it goes up
[1:00:56]
faster than a lot of traditional buildings and
[1:00:58]
is the most cost effective type of building
[1:01:00]
to use for the DPW facility. So I
[1:01:04]
do appreciate your concerns and we do try
[1:01:07]
to you know reduce the timeline as much
[1:01:10]
as possible and phasing does add to the
[1:01:12]
timeline I agree. Greg Jarboe, five Cherokee Road.
[1:01:24]
To follow-up on the the timing issue. How
[1:01:27]
many filed sub bids will this kind of
[1:01:30]
construction require? Quite a number. Yeah. Fortunately not
[1:01:35]
roofing because that's part of the building package
[1:01:38]
itself, but it could be 11. It could
[1:01:41]
be yeah. Yeah. The quantities of ceiling tile,
[1:01:44]
floor tile, miscellaneous metals, painting, masonry, electrical, HVAC,
[1:01:52]
plumbing, fire protection. Yeah. There's a lot. Yeah.
[1:01:54]
And that's that's very typical for, this type
[1:01:57]
of building. That that I'm aware. I haven't
[1:02:00]
lived in town as long as Dean, but
[1:02:03]
I've been in Acton since 1978. And from
[1:02:08]
'79 to '81, I was a legislative aide
[1:02:11]
to a state senator who chaired the state
[1:02:14]
administration committee when we got the ward commission
[1:02:18]
report about public construction in Massachusetts. And one
[1:02:24]
of the things that drives up the cost
[1:02:26]
of public construction in this state versus private
[1:02:29]
construction is the filed sub bid law. And
[1:02:34]
every time you have 11 or more different
[1:02:39]
sub bidders waiting for the other guy to
[1:02:44]
turn up to do their part, money money,
[1:02:52]
you know, goes out the window. So, again,
[1:02:55]
if facing this over two years seems prudent
[1:03:01]
and we don't have a cost estimate yet,
[1:03:04]
but, I gotta believe that one of the
[1:03:06]
ginormous cost drivers is gonna be time. It
[1:03:16]
it it is and filed sub bids are
[1:03:18]
just unfortunately part of the chapter 149 reality
[1:03:21]
that municipal projects have to deal with. Yeah,
[1:03:32]
I wonder if you could speak a little
[1:03:33]
bit to environmental studies soil sampling. You did
[1:03:37]
mention core drilling. I assume that's probably for
[1:03:39]
the geothermal, but is it also to explore
[1:03:41]
whether there's anything on-site that could be ledge
[1:03:44]
surprises in other ways? So the geotechnical investigation
[1:03:49]
was for the for the kind of the
[1:03:52]
structural evaluation of the soil capacity. Not yet
[1:03:56]
for the geothermal. We need to bring on
[1:03:58]
a well, a test well to evaluate the
[1:04:02]
ground capacity for geothermal. For environmental, you know,
[1:04:07]
this is a historical fifty year, more than
[1:04:11]
fifty year DPW site. It has had past
[1:04:13]
remediation. There was a dry well that was
[1:04:17]
abated 2,004, two thousand and eight, something like
[1:04:20]
that. So we, you know, and we also
[1:04:23]
work on a lot of different DPW sites,
[1:04:25]
but we are going to perform an environmental
[1:04:30]
evaluation. And at least for the initial cost
[1:04:34]
estimate, we're going to assume the site is
[1:04:37]
gonna be an export site largely. We're gonna
[1:04:40]
be removing soil from the site. So we
[1:04:43]
have to assume a percentage of that is
[1:04:45]
going to be contaminated soil. And we're going
[1:04:48]
to do our internal review. We don't have
[1:04:51]
to do a full phase one yet. We
[1:04:52]
don't have to do a full phase one
[1:04:53]
because the town owns the site. But we
[1:04:55]
do have to do an environmental assessment. And
[1:04:58]
we're gonna, once we complete that, we'll get
[1:05:02]
more data and revise our estimate as more
[1:05:05]
information becomes available. And so then my follow-up
[1:05:09]
question to that would be, what's the timeline
[1:05:10]
for that? I didn't see it on the
[1:05:12]
recent timeline that was given in terms of
[1:05:15]
where it We're performing the environmental now and
[1:05:19]
design development will be when we kind of
[1:05:21]
investigate further the next phase of design. So
[1:05:25]
that's taking place starting November. You're welcome. Well,
[1:05:40]
thank you unless there's any other questions, that
[1:05:43]
pretty much brings the public presentation to an
[1:05:49]
end. Thank you, John. Thank you, Della, for
[1:05:52]
a great presentation. Assistant town manager did note
[1:05:59]
a website. It's available. And we'll be posting
[1:06:03]
all of these documents. This presentation will be
[1:06:06]
available online as well. I encourage everyone to
[1:06:12]
reach out to all members of the committee.
[1:06:15]
I have a stack of my business cards
[1:06:20]
where I'd be happy to have people contact
[1:06:22]
me directly if you have any particular questions.
[1:06:25]
And I know that the town manager and
[1:06:27]
the assistant town manager and everyone in the
[1:06:29]
design team is eager to hear whatever input
[1:06:32]
you've got. The committee has not met since
[1:06:39]
March because we had so much prep work
[1:06:42]
to do with procuring the project manager and
[1:06:46]
the architect. But we will, later on tonight,
[1:06:50]
be determining a projected meeting schedule for the
[1:06:54]
next few months. And certainly if you would
[1:06:58]
like to get any more information, reach out
[1:07:01]
to us. Thank you. David? The committee's email
[1:07:07]
address is not on the website. I bet
[1:07:11]
that's going to get fixed. Thank you. Alright.
[1:07:22]
To, committee business for members of the committee.
[1:07:30]
Pull up the agenda. First item business we
[1:07:39]
do have a set of minutes, which I
[1:07:42]
think I've sent out a couple of times.
[1:07:46]
The, some of the members were not here,
[1:07:50]
for the particular meeting, but we'd like to,
[1:07:54]
get these meetings, these minutes reviewed and approved
[1:07:58]
so that we can get them posted. Town
[1:08:01]
Clerk's office. Mr. Chair, I move to approve
[1:08:04]
the minutes of, I believe it's 03/01/2024. Thank
[1:08:09]
you. You got a second? I'll second. Okay.
[1:08:14]
Moved and seconded. Any comments, questions? Just a
[1:08:19]
question. I wasn't present for the meeting, but
[1:08:22]
I have read the minutes. Should I vote
[1:08:23]
or abstain? I believe. I believe you can
[1:08:30]
vote for him. Okay. All in favor of
[1:08:35]
accepting the minutes of the March 1 meeting
[1:08:37]
please say aye. Aye. Opposed? Abstentions? Thank you.
[1:08:47]
We are going to be making a further
[1:08:52]
presentation to the select board. I've been pretty
[1:08:55]
much updating the select board for every one
[1:08:57]
of our meetings. So I will be working
[1:09:03]
with the select board chair as far as
[1:09:05]
setting aside a time so that we can
[1:09:07]
do a more timely update. Again, we talk
[1:09:15]
about process receiving input from residents. I know
[1:09:17]
some people have reached out already and I
[1:09:21]
hope to meet with, I believe it's Alice.
[1:09:25]
Thank you. So we can discuss the questions
[1:09:30]
that you've raised. I can't hear much either.
[1:09:42]
So Nothing came out of the drain that
[1:10:14]
I'm talking about. And nine chuckle fulls would
[1:10:17]
have a machine with two little, like, fork.
[1:10:20]
They took nine bucket loads out of that.
[1:10:22]
I thought, now it's that train. Why they're
[1:10:25]
so close together? I don't know. What has
[1:10:27]
really happened is that years ago, like, the
[1:10:36]
driveway, the road got higher and higher and
[1:10:38]
higher. And I said to one gentleman, I
[1:10:41]
I have to teach my car how to
[1:10:43]
jump if we replace this program one more
[1:10:45]
time and which really is a fight. So
[1:10:48]
now there's a there's a plunge because the
[1:10:52]
drain is too high or I'm too low.
[1:10:56]
Whatever. I'm in the low spot, obviously. It
[1:10:58]
didn't start that way, but it ended that
[1:10:58]
didn't start that way, but it ended that
[1:11:00]
way. Whatever. I'm the low spot, obviously. It
[1:11:00]
way. So they I'm asking if you could
[1:11:03]
build it takes probably an hour and a
[1:11:05]
half to build my driveway up up or
[1:11:08]
take that drain out so we have you
[1:11:12]
you know what I'm saying? I I know
[1:11:14]
what you're saying. I'll because everybody now with
[1:11:17]
the DPW knows the virgin drain. And the
[1:11:21]
engineer, I won't say any more than that.
[1:11:25]
I've had many conversations with her. I'm on
[1:11:27]
the list, and I said, I guess my
[1:11:30]
fear is I'm not gonna live long enough
[1:11:32]
to see if oh, you're on the list.
[1:11:34]
I said, may I see the list? No.
[1:11:35]
Of course not. So my question is my
[1:11:38]
first or my hundred and fortieth. So, there's
[1:11:41]
no answer. We'll try to get you that
[1:11:43]
answer. Yeah. And. I don't have my card
[1:11:47]
with me. Apologize. But reach out to me.
[1:11:53]
At any time. I'll discuss that. How is
[1:11:58]
it be? Can I ask one question? Sure.
[1:12:01]
Because I'm literally next door. Yes, you are.
[1:12:04]
And that's not a problem for me. I
[1:12:07]
mean, the noise sometimes is, you know, puts
[1:12:09]
a when the salt when they're using the
[1:12:12]
salt thing and that thing backs up. I
[1:12:14]
mean, it's it's it and I know they
[1:12:16]
have to do that, but I don't really
[1:12:19]
have to stand by because I'm on a
[1:12:20]
farm and we have to do the same
[1:12:22]
thing. It's that big, loud, big, big noise.
[1:12:25]
So you get used to it. You get
[1:12:28]
used to it. And plus, I'm grateful because
[1:12:30]
I wanna be the first person plowed out.
[1:12:32]
So that works for me. I'm glad. Yeah.
[1:12:36]
No. They I think the people there are
[1:12:37]
very, very nice. I think I think part
[1:12:40]
of the the site plan that we hope
[1:12:44]
will help things for the neighbors is that
[1:12:48]
although the building is going to be closer
[1:12:49]
to Forest Road than the existing building. We
[1:12:52]
hope that it's going to create a a
[1:12:55]
a shield for noise and for headlights. I
[1:13:01]
know when you wrote to me earlier, you
[1:13:03]
wrote to the committee earlier today, today. I'm
[1:13:06]
certainly, you know, sound fencing and that sort
[1:13:08]
of stuff. Those are the kind of amenities
[1:13:10]
that we wanna consider. Well, you know, like
[1:13:13]
on the highways, they have fences as high
[1:13:16]
as this room. Yeah. Is that to block
[1:13:19]
noise or is that Noise. It is really.
[1:13:23]
Well, I guess when I see that, when
[1:13:24]
I drive on the highways, I'm like, oh,
[1:13:27]
fencing. Wow. Well, that's the flip side of
[1:13:31]
it. You wanna look at that in your
[1:13:32]
backyard? I'm fine with that. Okay. Okay. Yeah.
[1:13:39]
I'd rather see that than cars and trucks.
[1:13:41]
Great. And plus, I want my deer to
[1:13:44]
have a my deer have a track through
[1:13:46]
the back. They used to come around through
[1:13:48]
my house, and I bought I bought some
[1:13:51]
of those solar creepy things. Yep. So now
[1:13:54]
they go all the way around the back
[1:13:55]
of my house and in between the two
[1:13:58]
houses and across the street. I'm like, perfect.
[1:14:01]
Perfect. And they mow down across the street.
[1:14:05]
Yeah. So then I'll come they don't come
[1:14:07]
at all of my property. Alright. But I'm
[1:14:09]
not seeing them come through because they're beautiful.
[1:14:12]
Yeah. I will I'll follow-up appreciate that. See
[1:14:17]
if we can do it. If you, you
[1:14:18]
know, at any time, give me a call.
[1:14:20]
Give me a call. I sent you pictures.
[1:14:23]
I I remember we had the discussion. Yeah.
[1:14:26]
Couple of years ago. Videos of them cleaning
[1:14:28]
out like, do you mind gonna call it
[1:14:30]
a virgin drain? It's never been used. It
[1:14:32]
doesn't hurt my feelings. No. I mean, it's
[1:14:36]
useless. I'll follow-up. Engineer, how come there's two
[1:14:43]
drains here and one is so high that
[1:14:44]
no water can go in it? Who who
[1:14:46]
designed that? Did you look at it? If
[1:14:48]
you did, don't answer the question. Good night.
[1:14:52]
Thank you. Thank you very much. Next question
[1:15:13]
for the committee is figuring out a schedule
[1:15:18]
of upcoming meetings. I don't believe the, the
[1:15:27]
estimate is going come back around the October
[1:15:29]
18. And I'm certainly happy to meet as
[1:15:34]
often as folks want, but I don't know
[1:15:37]
as we'll have a whole lot of new
[1:15:38]
information to talk about before then. So I'm
[1:15:42]
kind of looking towards the October for our
[1:15:46]
next meeting. And I guess the other question
[1:15:54]
is, is there any particular meeting night that's
[1:15:59]
better or worse for folks? Well, the first
[1:16:02]
question I would have is do we know
[1:16:03]
that the eighteenth is the date that the
[1:16:05]
estimates come back or is that just an
[1:16:07]
approximation? It's an approximation that he had commented
[1:16:10]
two to three weeks. So that's a two
[1:16:12]
week projection. Have to come back. Yeah yeah
[1:16:20]
it could be an early November yeah early
[1:16:23]
November ish. The third Thursdays tend to be
[1:16:31]
open for me. Would the would folks be
[1:16:37]
interested for a meeting on November 7. Yes.
[1:16:49]
Why don't we tentatively aim for November 7
[1:16:53]
for our next meeting and then I'll work
[1:17:00]
out a let's see why don't we schedule
[1:17:03]
one more after that and Dean just to
[1:17:06]
confirm these would be evening meetings 7PM evening
[1:17:08]
meetings same setup we can do yeah okay
[1:17:11]
and I think you know we could probably
[1:17:16]
if Room 9 is available, that would be
[1:17:21]
good. Well, this room, I mean Yeah. We
[1:17:24]
we may my my recommendation would be to
[1:17:27]
stay in here so we can continue holding
[1:17:29]
Zoom in a bigger public audience because if
[1:17:31]
we do receive any financial estimates back we're
[1:17:35]
gonna have a little bit of a crack.
[1:17:36]
I think people will be here. Yeah. Which
[1:17:38]
is a great thing. Yep. And hopefully more
[1:17:40]
people show up every meeting. We'll we'll plan
[1:17:44]
on November 7 here in this room and
[1:17:47]
then we wanna put another one in at
[1:17:55]
the November in case we in case we
[1:18:01]
get in let's see I was gonna say
[1:18:04]
the twenty eighth but I think that's Thanksgiving.
[1:18:05]
Thanksgiving. It's an interesting way to celebrate but.
[1:18:09]
Yeah. Not the way I want to celebrate.
[1:18:12]
How about the fifth? The fifth, I know,
[1:18:15]
I'm not going to be available but I
[1:18:17]
could certainly. What are the things from the
[1:18:22]
timeline after. I'd be happy to let someone
[1:18:31]
else. We can also wait until the October
[1:18:34]
meeting and make a. Yeah. Meeting at that
[1:18:36]
point. Yeah, let me do that and see
[1:18:37]
what. Yeah, I'm just bringing back up that
[1:18:39]
time on that to discuss. Okay. So, November
[1:18:43]
7, we'll meet here. And thank you very
[1:18:48]
much and we need one more motion. I'll
[1:18:52]
move to adjourn. I'll second. Okay, move in
[1:18:56]
second to adjourn. All in favor, say aye.
[1:18:58]
Aye. Opposed? Substentions? Thank you.