[0:03]
- Bonsoir et bienvenue à la
[0:06]
réunion ordinaire du conseil
[0:08]
municipal de lundi, le 25 mars.
[0:12]
>> Good evening and welcome to
[0:15]
the regular meeting of the
[0:18]
municipal council of March 25th.
[0:27]
I would like to start by making
[0:31]
--
[0:55]
>> Mulroney's tenure as prime
[0:57]
minister was marked by the
[0:58]
introduction of major economic
[1:01]
reforms. En mémoire du très
[1:06]
honorable et ancien premier
[1:08]
ministre, Brian Mulroney, et par
[1:10]
respect à sa famille, je vous
[1:12]
invite à vous lever et observer
[1:13]
un moment de silence.
[1:24]
(silence)
[1:50]
merci.
[2:09]
Alors, nous allons procéder avec
[2:12]
l'ouverture de la réunion.
[2:31]
- Alors, avant qu'on passe aux
[2:34]
questions écrites, j'aimerais
[2:38]
premièrement remercier la
[2:41]
conseillère Dominique Godin pour
[2:44]
m'avoir remplacé durant le mois
[2:46]
de février. C'était elle qui
[2:48]
était la mairesse à ce moment-là
[2:51]
pour tout le mois de février,
[2:54]
merci de m'avoir aussi remplacé
[2:57]
au conseil de ville du mois de
[2:59]
février. Alors merci beaucoup,
[3:01]
Dominique, un travail excellent.
[3:03]
- Ça fait plaisir.
[3:08]
- J'aimerais aussi souligner que
[3:11]
nous avons eues des athlètes aux
[3:17]
Jeux du Québec qui ont eu lieu à
[3:18]
Sherbrooke. Plusieurs athlètes
[3:23]
des Beaconsfield ont remporté
[3:28]
des médailles. Je vais les
[3:29]
nommer.
[3:31]
(---)
[3:34]
, médaille d'or pour le
[3:35]
badminton. Roger l'ail, médaille
[3:41]
d'argent pour le badminton
[3:42]
aussi. Et
[3:46]
(---)
[3:47]
pour lors, pour le badminton et
[3:51]
(---)
[3:53]
aussi a une médaille d'or pour
[3:55]
l'équipe. La première, c'était
[3:58]
pour le double et là, c'est pour
[4:01]
l'équipe. Il y a aussi Kobe vous
[4:04]
skier, médaille d'or pour le
[4:05]
curling.
[4:09]
(---)
[4:10]
, médaille d'argent pour le
[4:11]
hockey féminin. Sierra Austin,
[4:16]
une médaille d'argent pour le
[4:17]
hockey féminin. Et aussi, Sofia
[4:21]
Isabella
[4:22]
(---)
[4:23]
, une médaille d'argent pour le
[4:26]
hockey. Alors félicitations à
[4:28]
tous ces athlètes de
[4:29]
Beaconsfield. Je pense qu'il
[4:31]
mérite une main
[4:32]
d'applaudissements.
[4:33]
(applaudissements)
[4:38]
Alors maintenant nous allons,
[4:42]
passer... j'aimerais mentionner
[4:44]
aussi que le commandant,
[4:46]
normalement, le commandant du...
[4:50]
de la police, il va être avec
[4:53]
nous en avril seulement, je
[4:57]
crois qu'il cumule présentement
[5:00]
deux fonctions, celle de... un
[5:05]
autre pays ADQ cinq. PDQ5,
[5:13]
pardon. Malheureusement, il ne
[5:14]
peut pas passer autant de temps
[5:15]
qu'il aimerait avec nous au
[5:16]
Conseil.
[6:23]
-- if I remember correctly and
[6:25]
homes can be enforced. I've
[6:28]
experienced a feeling of
[6:29]
suffocation for more than three
[6:31]
weeks recently until I stopped
[6:33]
the habit of opening my windows
[6:35]
every night for half an hour.
[6:37]
Which I was practising the
[6:40]
entire summer. --
[6:57]
>> What measures Beaconsfield --
[7:01]
fireplaces comply or have
[7:03]
certification that guarantees in
[7:06]
the emission rate equal or less
[7:08]
to 2.5 grams of fine particles
[7:10]
per hour and into the
[7:12]
atmosphere, and to ban wood fire
[7:15]
places that do not comply from
[7:17]
being used. I would like to see
[7:20]
Beaconsfield also implement a
[7:22]
verification program and
[7:24]
implement a ban on the use of
[7:25]
noncompliant wood burning stoves
[7:27]
and fireplaces. Thank you very
[7:30]
much -- so, our answer to -- is
[7:35]
that the enforcement is
[7:39]
primarily complaint based. In
[7:40]
other words, we cannot act on
[7:45]
patrolling the city and watch
[7:49]
what is wood burning, but if you
[7:51]
have a complaint, that's the way
[7:53]
that we will react. We have not
[7:56]
received any complaints and no
[7:59]
infraction has been issued to
[8:01]
date. As mentioned at the last
[8:04]
two council meetings, we
[8:06]
reiterate that if you are
[8:08]
witnessing in your neighbourhood
[8:10]
continues burning, please do not
[8:14]
hesitate to call Municipal
[8:15]
patrol and give them the address
[8:18]
right away. A permit is also
[8:22]
required in order to install a
[8:26]
compliant fireplace,
[8:27]
documentation is required in
[8:28]
order to obtain the permit
[8:30]
showing the make and model, and
[8:33]
the location in the home. The
[8:40]
second questions or the second
[8:43]
person to ask a question is Mr.
[8:48]
Derrick pounds -- his questions
[8:52]
are on an agenda item 40.1,
[8:55]
40.2, 40.3, and 40.4 for March
[9:00]
25th -- council meeting. In good
[9:03]
faith and a spirit of
[9:04]
transparency, can you justify
[9:06]
the reason for each of these
[9:07]
loans and explain clearly there
[9:10]
consequences of these loans
[9:16]
totaling 8,206,490 53 for
[9:17]
Beaconsfield taxpayers? I will
[9:18]
ask our director general to
[9:20]
please answer those questions.
[9:23]
>> My pleasure, Mister Mayor.
[9:25]
So, to Mr. pounces questions,
[9:29]
item 40.1, which is related to
[9:32]
the centennial jetty, it's a
[9:35]
boring bylaw to help us to pay
[9:36]
for the contract if it's awarded
[9:40]
tonight. So, the jetty is a
[9:43]
project that was approved by the
[9:45]
minister of environment,. In
[9:47]
fact, we made an application
[9:49]
many years ago, at least five
[9:50]
years ago, to have a certificate
[9:53]
of authorization to do work in
[9:56]
the embankment on the riverside.
[9:59]
It takes many years for us to
[10:01]
get those certifications from
[10:03]
the Ministry, so it's been more
[10:05]
than five years. That we have
[10:07]
started to want to fix the
[10:11]
jetty. If you will walk there,
[10:12]
you will see that's parts of it
[10:14]
that are going down the lake and
[10:15]
it's becoming dangerous. So,
[10:18]
this is to help us do the work
[10:20]
and fix the jetty for hopefully
[10:23]
very long period of time. The
[10:26]
second boring bylaw, which is
[10:29]
related to the construction of
[10:32]
work for the retention basin
[10:35]
tower and helm in that area. In
[10:37]
fact, the retention basin is
[10:40]
going to be linked with larger
[10:43]
pipes. We're over sizing some of
[10:44]
the pipes to make sure they
[10:46]
flow, it doesn't flow as fast
[10:49]
into the middle Brook creek when
[10:52]
it goes too fast, something's
[10:54]
coming blocked the creek, then
[10:55]
it backs up and it could create
[10:56]
some problems, as some of our
[10:58]
residents in that area have
[11:01]
suffered in some of the past
[11:02]
years, and we think that this
[11:03]
solution would be very helpful
[11:07]
to avoid those backups in the
[11:11]
drainage system. 40.3 is related
[11:14]
to sanitary sewer pipes and
[11:16]
various sectors of the city. So,
[11:18]
this is our annual boring bylaw
[11:20]
for underground infrastructure.
[11:22]
Sometimes it's for sewers,
[11:24]
sometimes it's for water mains.
[11:27]
So, this is our kind of annual
[11:30]
regular boring bylaw and -- in
[11:33]
order to prepare plans is to
[11:35]
prepare plans inspects for
[11:37]
engineers and architects. Item
[11:39]
40.4, I'm sorry. So, boring
[11:42]
bylaws two -- by architects for
[11:44]
the renovation. Work that needs
[11:46]
to be carried out at the
[11:48]
recreation center. I believe if
[11:51]
you want the reason we are not,
[11:53]
you could see that the center is
[11:56]
aging and it needs lots of TLC.
[11:59]
So, when fixing infrastructure
[12:01]
is requiring important funds, it
[12:03]
is financially appropriate to
[12:04]
loan the money to support
[12:06]
municipalities to perform the
[12:08]
required work to fix its
[12:10]
infrastructure. So, many of
[12:11]
those loans are related to
[12:12]
grants from the provincial and
[12:14]
federal governments, such as
[12:16]
what we call a gas tax, for
[12:18]
example. The loans that we're
[12:19]
looking at tonight are made on
[12:20]
20 years boring duration, so
[12:23]
that's to answer Mr. -- the
[12:25]
question about the Beaconsfield
[12:27]
taxpayers and the impact on
[12:29]
taxpayers from when the work is
[12:30]
performed, the need to borrow,
[12:32]
it takes about two years before
[12:35]
it does have an impact on the
[12:36]
budget. After two years, the
[12:39]
work is performed, it's
[12:40]
transmitted into the taxes, for
[12:42]
example. A 1 million dollar loan
[12:44]
at 5% interest represents an
[12:46]
annual cost of $80,200 in our
[12:50]
budget, capital interest for, in
[12:52]
this case, would be 20 years,
[12:54]
for example. That's $12.16, or
[12:59]
0.17%. Everything being equal on
[13:02]
the average house, property
[13:04]
house in Beaconsfield for 2024.
[13:06]
Of course, we're talking 2026 or
[13:10]
2027 and some of those boring
[13:11]
bylaws will be with us for
[13:12]
three, four, and five years. For
[13:14]
example, the architects, they're
[13:16]
not doing the work in one year.
[13:18]
It's a four, five-year project.
[13:20]
We must take into account though
[13:22]
that if there is an increase in
[13:25]
our debt service capital
[13:28]
interest, when we have a new
[13:29]
bylaw, we also have old bylaws
[13:32]
that are released from our
[13:35]
capital interest because there
[13:36]
are some bylaws that are 20
[13:38]
years old that will be not
[13:41]
paying any more. So, there is a
[13:44]
rolling effect on the bylaws
[13:45]
that we have. When the city. So,
[13:49]
we might have to increase our
[13:51]
debt to meet the needs at the
[13:53]
present time. But our debt is
[13:56]
very low, Mister Mayor, as you
[13:58]
know. We will be able sometime,
[14:00]
probably the next budget, to
[14:02]
present some statistics about
[14:03]
our debt level and the capacity
[14:06]
that we have to increase our
[14:09]
debt to face our
[14:12]
infrastructures.
[14:13]
>> If I'm not mistaken, Mr.
[14:16]
Boileau, whenever we increase
[14:18]
our debt, we eventually increase
[14:20]
taxes.
[14:21]
>> Exactly, it does. If we're
[14:23]
able to remove some of the debt,
[14:26]
everything would be equal, there
[14:27]
is no concern. But when we
[14:29]
increase the debt more, it does
[14:30]
have an impact on taxes.
[14:32]
>> I just want to make sure
[14:34]
everybody understands that debt
[14:37]
is not like our prime minister
[14:38]
says, we can't forget about it.
[14:41]
It has to be repaid somehow and
[14:43]
it does also increase -- taxes.
[14:48]
The next question is from Nicole
[14:52]
-- from Saint Andrew.
[14:57]
- Je pense que vous avez oublié
[14:58]
la question deux.
[15:01]
- Tu vas répondre...
[15:02]
- Vous n'avez pas lu la
[15:03]
question. La question deux,
[15:07]
d'accord. So yeah, Mister pounds
[15:10]
I guess asked a second question
[15:11]
in good faith and the spirit of
[15:13]
transparency, can you clarify
[15:14]
what is implied by the
[15:16]
authorization to sign
[15:17]
professional services agreements
[15:18]
with the finalist of the
[15:21]
architectural competition? We --
[15:23]
imagine centennial project. How
[15:25]
much expense is involved for
[15:27]
Beaconsfield taxpayers and will
[15:29]
alone bylaw be required?
[15:32]
>> Already has, Mister Mayor.
[15:33]
So, Jerry council appointed
[15:35]
residents and professionals on
[15:37]
the jury of the architectural
[15:39]
contest for the imagine
[15:41]
Centennial project. At the same
[15:42]
time, the contest was launched,
[15:45]
inviting architects to submit
[15:46]
proposals to the jury. The rules
[15:48]
of the contest are slightly
[15:50]
different than irregular
[15:52]
tendering process, so the
[15:56]
minister issued an approval to
[15:57]
the City to award the contract
[15:58]
via the requirements of our
[16:01]
architectural contest. The jury
[16:02]
will soon be judging the
[16:04]
proposals submitted by the
[16:05]
candidates as part of the first
[16:06]
phase. From there, four
[16:08]
finalists will be chosen by the
[16:11]
jury to prepare detailed designs
[16:13]
and their ideas on the project,
[16:16]
as approved by the -- finalist
[16:18]
will receive professional fees,
[16:20]
which are determined by the
[16:22]
professional decree for the
[16:23]
second phase of architectural
[16:24]
competitions. The four finalists
[16:26]
will be announced in April and
[16:30]
information will be added to our
[16:32]
dedicated section of the website
[16:33]
for the imagined project. The
[16:35]
cost of this step in the process
[16:37]
of the project is around 400 to
[16:40]
$500,000. The money will come
[16:43]
from our reserve for
[16:46]
professional services. As
[16:48]
mentioned last year, I am sure
[16:51]
many of us have forgotten
[16:52]
already, we will receive a
[16:54]
substantial grant for this
[16:55]
project in the order of $300
[16:57]
million from the minister of
[16:59]
communications and culture. An
[17:01]
official announcement should
[17:02]
also be made in April.
[17:07]
>> Thank you, Mister Mayor.
[17:09]
>> Thank you very much, Mr.
[17:10]
Boileau. While we will go to the
[17:14]
question that was asked by Madam
[17:17]
Colorado from Saint Andrew. Her
[17:20]
first question is on 30.8, West
[17:24]
Island association for the
[17:26]
intellectually handicapped. Mrs.
[17:30]
Colorado asked a question
[17:31]
regarding financial support for
[17:34]
the neurodivergent community. I
[17:36]
will not read all the preamble
[17:39]
which is -- but Madame -- our
[17:43]
director of culture and leisure
[17:45]
will answer the questions to you
[17:48]
directly. We
[17:51]
>> The next question from madame
[17:54]
Corrado was on 20.4, 30.4, and
[17:58]
30.9, tree planting -- club
[18:01]
contract. Please invest more in
[18:05]
tree planting, we -- engage the
[18:07]
public in tree planting. I
[18:09]
really enjoyed the events at the
[18:11]
dog park last year. I'm quite
[18:13]
concerned about the 1600 dollars
[18:15]
given to the annual greens
[18:17]
maintenance of the lawn bowling
[18:19]
Club behind -- annex. The lawn
[18:22]
bowling Club uses synthetic and
[18:24]
toxic herbicides and pesticides,
[18:26]
all of which are toxic to the
[18:29]
environment. Carcinogenic and
[18:32]
tested on animals. A senior
[18:36]
friendly municipality should not
[18:37]
be spraying -- or 2.4 D or any
[18:40]
other chemicals at a place where
[18:43]
our elderly residents love to
[18:45]
hang out. It is also cheaper and
[18:47]
in the long run to use organic
[18:49]
methods of weed control. Two
[18:52]
places in the USA have done this
[18:54]
quite successfully. One golf
[18:55]
course and one lawn bowling
[18:57]
Club. The -- permit is almost
[19:00]
up, please do not renew it and
[19:02]
go organic instead. She mentions
[19:06]
to the lawn bowling Club in the
[19:09]
States and the golf club in the
[19:11]
States. I will not get into
[19:13]
that. But my response to her is
[19:17]
thank you for expressing your
[19:19]
concerns regarding the use of
[19:21]
synthetic herbicides and
[19:22]
pesticides at the lawn bowling
[19:26]
Club behind the herb --
[19:27]
regarding the regulations
[19:29]
covering the use of pesticides
[19:31]
at the lawn bowling Club, it is
[19:33]
essential to emphasize that
[19:34]
while the use of pesticides is
[19:38]
authorized, as per the beak one
[19:41]
for bylaw, concerning the use of
[19:43]
pesticides, it must be done in
[19:45]
compliance with strict
[19:47]
guidelines outlined in article
[19:48]
six of the bylaw. These
[19:51]
regulations include requirements
[19:52]
for the lawn bowling Club
[19:54]
operator to submit a written
[19:57]
declaration of the products
[19:58]
intended for use, post signage
[20:01]
after spring, maintain a
[20:03]
registry of pesticides
[20:04]
applications, and submit the
[20:07]
pesticide reduction plan every
[20:09]
three years. Given these
[20:11]
regulations, I can assure you
[20:13]
that the city is committed to
[20:14]
ensuring that any pesticide use
[20:16]
of the lawn bowling Club is
[20:18]
carried out responsibly and
[20:21]
transparently. We will closely
[20:24]
monitor compliance with these
[20:25]
regulations and work with the
[20:26]
lawn bowling Club management to
[20:30]
explore opportunities for
[20:31]
transitioning to organic methods
[20:33]
of the weed control
[20:34]
-. We,?
[20:37]
-.
[20:38]
>> Thank you. I would add about
[20:39]
the tree planting, the contract
[20:42]
20.4 is to replace the -- trees
[20:45]
that were taken down after the
[20:47]
ice storm of last year and this
[20:49]
contract is going to be paid
[20:52]
back by the agglomeration under
[20:55]
the security civil rules of the
[20:57]
government, due to this ice
[21:00]
storm that we had. Also, I would
[21:01]
like to mention that since 2012
[21:04]
-- we've been doubling the
[21:06]
amount of trees that were
[21:08]
planting previous to those
[21:09]
years. And also, we have an
[21:13]
agreement with -- two encourage
[21:15]
residents to plant trees at
[21:19]
advantageous costs because we do
[21:22]
subsidized at a cost to plant a
[21:23]
tree that was taken down or to
[21:25]
plant a new tree.
[21:29]
>> Thank you, Mr. Boileau. Next
[21:32]
question was on the demolition
[21:34]
of pipe 24 rock hill. Thank you
[21:38]
for saying no to the demolition
[21:41]
of 524 rock hill. That was voted
[21:47]
at the committee, but it is on
[21:49]
the agenda tonight, again, for
[21:53]
the Council to determine whether
[21:55]
the demolition will not go on or
[21:58]
will be accepted. So, when it's
[22:02]
not saying no to the demolition
[22:04]
at this point. The homeowner had
[22:07]
allegedly deliberately poked
[22:08]
holes in the roof, so they could
[22:10]
claim the house was damaged. I
[22:14]
looked at the front and back of
[22:15]
the house close up and it looks
[22:17]
perfectly salvageable. If it is
[22:19]
for sale, I would love to buy
[22:21]
it. If I could somehow afford
[22:23]
it. It is across from my
[22:26]
cousin's house and I love 524
[22:29]
rock hill. It is a lovely,
[22:31]
little house with a beautiful
[22:33]
backyard and a nice shed that
[22:34]
could be made into an art
[22:37]
studio. Tearing it down would be
[22:39]
very disruptive to their lives
[22:40]
and to my life, respectfully. I
[22:44]
go over to their place all the
[22:45]
time. Please keep the property
[22:46]
intact. Also 74 Devin seems to
[22:49]
have a lot of trees and seems to
[22:51]
have we building on it already.
[22:54]
Please preserve buildings and
[22:55]
trees on all the properties as
[22:56]
much as possible. So, Madam
[22:59]
Corrado, I want to thank you for
[23:01]
your comments regarding the
[23:04]
demolition and regarding the
[23:05]
trees at 74 common, Devin last
[23:11]
question is on. Rodenticide.
[23:16]
Madam Colorado makes comments
[23:17]
and suggestions regarding
[23:20]
rodenticide use in Beaconsfield.
[23:21]
I will not read all the comments
[23:24]
and the preamble, but I can
[23:27]
assure you, Madam Corrado, that
[23:28]
we will transfer your comments
[23:30]
to the environmental inspection
[23:33]
of public works. The next
[23:37]
question is from Zachary P
[23:41]
travesty of Olympic and subject
[23:45]
is the jetty rehab. There are
[23:51]
several questions with regard to
[23:56]
the jet he rehab and I will ask
[24:00]
Mr. Boileau to perhaps go circle
[24:01]
all the questions and the
[24:05]
answers as well.
[24:06]
>> -- so, the question was, why
[24:07]
was this not included in the
[24:09]
three-year capital program if it
[24:10]
is included -- why was this the
[24:14]
case? It speaks to the need to
[24:16]
stop bundling things together
[24:17]
and continuing to refuse to put
[24:19]
line item specific in the
[24:20]
three-year plans that showed for
[24:22]
public use. If this project was
[24:24]
not included, it represents
[24:25]
pressure to capital plan --
[24:29]
reductions elsewhere to balance
[24:31]
the pressure. So, it's not worth
[24:35]
imagining and yes, it was not
[24:36]
included in the three-year
[24:38]
capital plan. It was a project
[24:41]
that was carried over from 2023,
[24:44]
we but I agree, it could've been
[24:47]
presented as so that there was
[24:49]
this project that we would come
[24:52]
through for 2023. Which was not
[24:56]
the case, but point taken. So,
[24:59]
we it is the same for a few
[25:01]
other projects. I'm thinking of
[25:02]
the arena that it's coming soon.
[25:04]
But for the jetty, we're also
[25:06]
hoping to receive a confirmation
[25:07]
of 1 million dollar grant from
[25:09]
Infrastructure Canada. We are
[25:11]
still waiting after eight months
[25:12]
of the requests, so there is
[25:16]
also the -- guarantees the price
[25:19]
of the bids. The bids were open
[25:22]
November 1st and so, the
[25:24]
guarantees for the prices in the
[25:27]
bids processor ending this week,
[25:28]
so this is the latest date that
[25:30]
Council meets that we can award
[25:33]
this contract. The question to
[25:34]
was, how required or critical is
[25:36]
this work? How much of this is
[25:38]
from a safety structural
[25:39]
perspective or desire to improve
[25:41]
cosmetics? Why is so important
[25:42]
and why now? Can we not wait
[25:45]
until government grant money is
[25:46]
confirmed? A jetty
[25:48]
rehabilitation is mutually
[25:50]
exclusive from any building in
[25:51]
the park. These are separate
[25:52]
projects and should be treated
[25:54]
accordingly. Yes, they are
[25:56]
separated and we treat them
[25:57]
differently. You are right when
[25:59]
you say that is not directly
[26:01]
related to imagine project. We
[26:04]
have work with the minister of
[26:05]
the environment for the last at
[26:06]
least the last five years to
[26:08]
obtain this see a certificate of
[26:10]
authorization to fix the jetty
[26:12]
that's becoming more and more
[26:15]
dangerous. We've already
[26:17]
installed the one section of the
[26:18]
embankment and -- safety
[26:19]
reasons. This is a ends in 2025,
[26:22]
therefore, the work has and
[26:24]
could only be performed during a
[26:27]
very specific time of the year,
[26:29]
which is late August to the end
[26:32]
of October and depends on the
[26:33]
level of the water, movements of
[26:35]
the fish, and bird migration.
[26:37]
That's when we work with those
[26:39]
biologists, we have to look
[26:40]
after these things and it's huge
[26:43]
constraints, of course. Question
[26:45]
three, what alternatives have
[26:47]
been explored to this week,
[26:48]
reduce score, functional repair
[26:50]
replacement only versus
[26:51]
beautification. -- so, we have
[26:54]
considered to removal of the
[26:56]
jetty because we cannot leave it
[26:57]
as is. So, the cost estimated is
[27:03]
about 1.8 million of taking the
[27:05]
jetty out of the water, in
[27:08]
comparison to fix it cost as
[27:10]
presented to the Council tonight
[27:11]
and it could only be done after
[27:14]
another lengthy process of
[27:16]
obtaining a CA, so if we decide
[27:19]
we don't want to fix the jetty,
[27:20]
we have to remove it, we will
[27:21]
have another five, six, seven
[27:24]
years, I don't know, with the
[27:25]
Ministry of the Environment. I
[27:26]
have no control on that but we
[27:29]
have to reset -- redo plans and
[27:31]
specks, go to their government,
[27:34]
-- remove that and it's going to
[27:35]
take more years, of course. It's
[27:37]
going to be -- 1.8 million in
[27:40]
that time and in that case, we
[27:42]
could think that the jetty would
[27:43]
have to be condemned totally or
[27:46]
partially for safety reasons.
[27:49]
>> Thank you, Mr. Boileau. Last
[27:54]
written question we've received
[28:00]
was from Caroline Malcolm,
[28:01]
Montrose. The subject is speed
[28:02]
once at Sherbrooke and Monroe's
[28:03]
intersection. Again, as I watch
[28:05]
people drive right through stop
[28:07]
signs at this intersection,
[28:09]
regularly, I ask for speed
[28:12]
bumps. It's dangerous for the
[28:14]
children and adults. Speed bumps
[28:16]
work. I have to commend the fact
[28:19]
that when I notified authorities
[28:22]
at one of the stop signs was
[28:23]
damaged by the snow clearing
[28:26]
activities at this intersection
[28:28]
this past winter, the resolution
[28:30]
was within hours. Why can this
[28:33]
not happen with a speed bumps?
[28:36]
What more do we need to study as
[28:38]
we all know, speeding is an
[28:40]
issue. I would think that speed
[28:43]
bumps are a low cost solution
[28:44]
that could be implemented in a
[28:46]
couple of weeks, not months or
[28:49]
years. And speaking of issues
[28:51]
that take too long to resolve, I
[28:53]
would hope that the tax
[28:55]
situation with the City of
[28:56]
Montréal could be finally
[29:00]
resolved in 2024, as well as
[29:02]
improved action from
[29:04]
Hydro-Québec reducing the number
[29:05]
of electrical outage we are
[29:07]
experiencing. We could start
[29:09]
with buying the wires, pruning
[29:11]
tree branches, and enhanced the
[29:14]
network. Thanks in regards for
[29:17]
your consideration. So, Madam
[29:22]
Malcolm, your request regarding
[29:24]
speed bumps was sent to the
[29:27]
traffic advisory Committee last
[29:29]
November. The first meeting
[29:32]
since then will be held in
[29:34]
April. Your requests will be
[29:36]
studied and analyzed at the
[29:39]
April meeting. With regard to
[29:43]
Hydro-Québec, the city adopted a
[29:46]
resolution last May to this
[29:48]
effect and a meeting was held in
[29:51]
July between the mayor and
[29:53]
representatives of Hydro-Québec.
[29:56]
Further discussions are planned
[29:57]
with the administration. I agree
[30:05]
that -- wires should be done. It
[30:08]
has been my saying with hydro
[30:14]
all along. In Beaconsfield,
[30:16]
particularly because of the
[30:17]
large tree canopy, it is an
[30:24]
expensive proposition to realize
[30:26]
but I think it could be done in
[30:30]
stages. Personally, I have so
[30:35]
much confidence in Hydro-Québec
[30:36]
that I have now, like many other
[30:39]
residents, installed a
[30:44]
generator. So, now that is the
[30:50]
end of the written questions.
[30:54]
Likely we can go to the floor
[30:59]
Pour les gens qui sont ici dans
[31:01]
le moment. Poser les questions.
[31:04]
I would appreciate that the same
[31:11]
questions, with Matt the same
[31:17]
information, does not come back,
[31:21]
so that you give everybody a
[31:23]
chance to have questions if they
[31:27]
are on various subjects. So,
[31:33]
please, after a while, if I see
[31:36]
that the same question is being
[31:37]
asked, we will try to move on to
[31:40]
other people that have other
[31:42]
questions as well. So, here we
[31:44]
go. Questions?
[31:49]
>> Thank you, gentlemen. I'm
[31:52]
here to ask you a question.
[31:53]
>> Could you identify yourself?
[31:55]
>> Oh, Jason Bolton. So, it's in
[31:58]
regard to downplay the
[32:00]
development. I think the first,
[32:02]
I have a question, but my
[32:04]
statement is, our community is
[32:05]
not against the development of
[32:07]
this project. This needs to be
[32:09]
understood, but we are against
[32:10]
it as it stands, and that's why
[32:12]
we would like for you to vote no
[32:13]
because of my understanding is,
[32:15]
there is no opportunity to
[32:17]
negotiate it. It's either yes or
[32:18]
no and in order to do that, it
[32:20]
would have to be a no. So,
[32:22]
question to you with respect to
[32:23]
this and not to rehash the same
[32:26]
questions that have come forth
[32:27]
to you guys, and ladies, is
[32:31]
around the floor area ratio. So,
[32:33]
I tried to do some homework to
[32:35]
understand currently were on
[32:37]
zero point and the request for
[32:38]
the development 1.8. That sounds
[32:41]
as 100 25% increase. I am not
[32:43]
able to find any relevant
[32:45]
example. I found examples, but
[32:47]
no relevant example that shows
[32:51]
125% increase. So, my question
[32:54]
to everybody is, what have you
[32:56]
used as an example when you're
[32:58]
debating in your caucus to
[33:00]
justify such an increase?
[33:11]
Je n'ai pas l'information.
[33:12]
>> I don't have the specific
[33:13]
answer for that. I believe we
[33:15]
did some studies in the
[33:17]
department with our experts. Je
[33:21]
ne sais pas, Mireille, si tu es
[33:23]
capable à m'aider à répondre à
[33:24]
we have -- cette question. Nous
[33:25]
avons Mireille. Who's a division
[33:26]
with the urban planning. We're
[33:28]
very fortunate to have her with
[33:29]
us tonight.
[33:41]
-
[33:42]
>> I will do it from here. There
[33:44]
is no other projects like that
[33:45]
in Beaconsfield, so the only one
[33:47]
that exists, and that's
[33:48]
permanent in the zoning bylaw,
[33:49]
is the Artemis project on the
[33:51]
corner of elm and Alvin. This
[33:55]
one is at 1.6, but 1.6 is one
[34:00]
per metre of the project. It is
[34:03]
at 1.6 the building that's the
[34:04]
right now, but at the end of the
[34:06]
project, it's going to be 1.6.
[34:08]
But the density is going to be
[34:10]
way higher because per building,
[34:13]
it's permitted to go all the way
[34:18]
to 60 units. It's just different
[34:22]
density per metres, but it would
[34:23]
come to basically the same
[34:25]
density at the end regarding the
[34:28]
size of the lot that it's built
[34:30]
on.
[34:31]
>> So, why are we setting a
[34:32]
precedent? Is this a follow-up
[34:34]
question to that, because there
[34:35]
is no other example in
[34:37]
Beaconsfield, there is no other
[34:38]
example in neighbouring boroughs
[34:40]
either. So, this particular one,
[34:42]
in that particular area, with
[34:44]
that location and the residents,
[34:46]
is quite a large increase with
[34:48]
respect to where it's being put.
[34:49]
So my only question is, why
[34:51]
can't the project move forward
[34:54]
with a reasonable rate rather
[34:56]
than such a drastic one? But
[34:59]
this is for everybody, please.
[35:02]
>> I think you'll hear more
[35:04]
about, because there will be a
[35:06]
-- leader on this project. But
[35:08]
we are voting now -- Projets
[35:15]
particuliers de construction, de
[35:17]
modification ou d'occupation
[35:18]
d'un immeuble. The -- has been
[35:24]
reviewed by the sea seat you and
[35:30]
it's recommended, the
[35:31]
recommendation of the CCU is to
[35:33]
go ahead and, you know, it's one
[35:43]
of the few fraudulence of
[35:45]
Beaconsfield, so obviously there
[35:46]
will be exceptions to this one
[35:49]
from any other. We can't compare
[35:51]
ourselves with some of the other
[35:52]
said he's. Cities.
[36:01]
>> Hi, good evening, my name is
[36:03]
Amanda. I'm the director of --
[36:06]
daycare center located right
[36:10]
beside elm plaza. I want to take
[36:12]
a moment to thank you for taking
[36:13]
the time to hear what I have to
[36:14]
say because I know
[36:16]
wholeheartedly how important my
[36:18]
role as an advocate for young
[36:19]
children, especially in regards
[36:21]
to their well-being and health.
[36:25]
I've signed you guys countless
[36:28]
informations and research
[36:29]
regarding the effects on young
[36:32]
children's developing systems
[36:34]
and how the brain, nervous
[36:36]
system, and respiratory system
[36:37]
are not fully developed until
[36:39]
the age of six. Young children
[36:41]
at our daycare centre are there
[36:43]
from, you know, six months old
[36:46]
until five and a half years old
[36:47]
sometimes. So, they will spend
[36:48]
on average four or five of those
[36:51]
years because the project is
[36:52]
expected to last at least five
[36:55]
years. In a zone that can be
[37:01]
absolutely detrimental to their
[37:02]
health. So, some people will
[37:05]
only ever know that further
[37:07]
daycare experience where they
[37:08]
spend more than eight hours
[37:09]
every day. Under no circumstance
[37:13]
should the health of young
[37:14]
children be risked to ensure
[37:16]
that a project for a developer
[37:18]
is profitable. My question to
[37:22]
you is, has the city looked at
[37:24]
every safety and construction
[37:25]
code in relation to young
[37:27]
children, including those
[37:29]
considered vulnerable or with
[37:30]
disabilities? Because we do have
[37:32]
children with disabilities that
[37:33]
are extremely sensitive to
[37:34]
noise, vibration, to all of
[37:40]
that. To ensure that the
[37:44]
children will not be compromised
[37:45]
in any way. If you have, what
[37:48]
are they? Because I haven't
[37:50]
heard or seen anything discussed
[37:52]
about it. And if it hasn't been
[37:55]
looked at, how can you possibly
[37:57]
consider passing a project
[37:59]
without any regard for this? Is
[38:02]
the city ready to suffer the
[38:04]
consequences, air and noise
[38:06]
pollution, and construction
[38:08]
sites can have on the developing
[38:10]
systems of young children during
[38:12]
their most fragile years? And
[38:14]
these are lifelong consequences
[38:16]
we are talking about. There are
[38:18]
not just, you know, immediate,
[38:19]
one or two years and then
[38:21]
everything is good. They can be
[38:22]
lifelong health consequences for
[38:25]
this. So, have they've been
[38:28]
discussed? And have you consider
[38:29]
them? If so, you know, what is
[38:30]
it?
[38:34]
>> Thank you. For your question,
[38:36]
I have to tell you that the
[38:37]
safety and health of children
[38:40]
are as important as those of all
[38:43]
road users. We prioritize all
[38:46]
active and passive safety
[38:48]
measures to provide a safe
[38:52]
environment for all road users,
[38:54]
be they children, young people,
[38:56]
families, or senior citizens. We
[39:00]
have always acted and continue
[39:03]
to active vigilantly and
[39:06]
promptly to ensure road safety
[39:08]
in Beaconsfield, even in the
[39:10]
context of some of our schools
[39:13]
being located close to arterial
[39:15]
roads, particularly Beaconsfield
[39:19]
boulevard, beau repair drive,
[39:20]
and elm avenue. In 2022, alone,
[39:24]
the city of Beaconsfield spent
[39:26]
more than $400,000 on
[39:30]
improvements and traffic calming
[39:32]
measures near schools and parks.
[39:36]
It's also worth noting that
[39:39]
recent construction projects at
[39:42]
Christmas Park and St. ramie
[39:44]
schools did not result in any
[39:46]
health impacts on the students
[39:48]
or children playing in adjacent
[39:51]
parks. When all cases, and other
[39:55]
all circumstances, our
[39:56]
priorities are the same toward
[39:57]
pedestrians, cyclists, and
[39:59]
motorists. It's never about
[40:01]
compromise, it's always about
[40:03]
safety and you can count on the
[40:05]
whole administration of the
[40:06]
City, your councillors, and
[40:08]
myself, to keep you safe.
[40:10]
>> I can appreciate that. I just
[40:12]
want to point out that, you
[40:13]
know, the majority of what you
[40:14]
said to me right now is about
[40:16]
road safety and that's, you
[40:17]
know, very little of what I
[40:19]
asked. My question in terms of,
[40:21]
you know, --
[40:22]
>> I think I answered your
[40:23]
questions, thank you.
[40:25]
>> No --
[40:28]
>> That's my answer. That's my
[40:32]
answer. Thank you.
[40:36]
>> That's quite frustrating.
[40:38]
>> Thank you.
[40:43]
>> Hi, my name is -- I'm glad
[40:48]
you complemented Brian Mulroney.
[40:50]
I worked with by Brian one
[40:51]
really. This is a health
[40:52]
question. Infectious diseases
[40:55]
are spreading. I worked with
[40:57]
Bryan when I was an
[40:59]
environmental engineer, he was
[41:00]
working for iron work company.
[41:01]
He was very conscious of that,
[41:03]
it was -- he was good at that.
[41:06]
And right now, there is a big,
[41:08]
big epidemic globally, whooping
[41:11]
cough, tuberculosis, all
[41:14]
diseases that I remember when I
[41:17]
was a young guy and said, I'm
[41:18]
not going to get them. But
[41:19]
people are getting older and
[41:22]
this is going to be a calamity.
[41:23]
Now, I didn't see anything
[41:26]
Beaconsfield put in writing we
[41:28]
are going to improve the doctors
[41:30]
or I'm not saying that you don't
[41:31]
have good doctors.
[41:32]
>> What is your question?
[41:34]
>> The question is what the heck
[41:35]
are you doing about telling the
[41:36]
people that we're having an
[41:37]
epidemic and you're doing
[41:38]
nothing about it?
[41:40]
>> I think it's a provincial
[41:41]
health issue and it is up to --
[41:44]
>> So, we are part of the
[41:45]
province.
[41:46]
>> Then talk to your am and a,
[41:50]
not to us.
[41:53]
>> Can you not put in your --
[41:55]
>> Speak to your am and a
[41:57]
because it is a health issue.
[42:00]
>> You publish this thing
[42:03]
everywhere.
[42:04]
>> Talk to your MNA.
[42:05]
>> Mister Mayor, we did publish
[42:07]
it last Friday around five PM
[42:08]
because we have received --
[42:11]
afternoon a notification from
[42:12]
the Ministry that we are asking
[42:15]
us to defuse a message to as
[42:17]
many as possible, so we did --
[42:20]
>> It's in writing?
[42:21]
>> It's in writing if you read
[42:23]
your social media network from
[42:27]
the city, -- or Facebook, or
[42:29]
other messages that we send out.
[42:32]
>> Well, there are old folks who
[42:34]
would appreciate that, thanks.
[42:35]
>> Thank you.
[42:46]
>> Good evening, everyone. My
[42:48]
name is David world, I'm a
[42:49]
resident of fairway Drive in
[42:51]
Beaconsfield. My question is
[42:53]
kind of a twofold question and
[42:57]
it relies, it's based a little
[42:59]
bit on the daycare situation.
[43:03]
Part of that first question is,
[43:04]
and I noticed that we've
[43:06]
allocated or there is an
[43:08]
allocation of a five-year term
[43:11]
in which to bring this proposal
[43:13]
or this building of 275 elm to
[43:21]
its rightful completion. With
[43:24]
five year period is absolutely
[43:27]
absurd. If you look at buildings
[43:29]
being built, I mean, first of
[43:30]
all, I believe there is an
[43:33]
18-month sort of cap on these
[43:36]
buildings being built. If we
[43:38]
look at the Champlain Bridge, it
[43:41]
took about a year and a half.
[43:44]
Why would a project as small as
[43:46]
275 get a five-year term? That's
[43:49]
the first question. And in that
[43:52]
five-year term, the daycare is
[43:54]
going to suffer yet even
[43:56]
further. If it was controlled in
[44:01]
an 18-month fashion, measures
[44:03]
could be put in place to protect
[44:06]
the kids and the surrounding
[44:08]
area. Over a five-year term, I
[44:12]
can't even imagine what the
[44:15]
consequences are. We
[44:20]
>> I will ask me Ray if she
[44:23]
could perhaps explain the whole
[44:28]
process that will eventually
[44:32]
complete the project and how
[44:36]
complicated, how complex it is.
[44:39]
>> Yes, first of all, the
[44:40]
project is that they propose is
[44:44]
three phases. So, the first
[44:47]
building that is on elm would be
[44:49]
two phases. Each permit that we
[44:52]
issue at the City can be
[44:54]
realized, completed in 12 months
[44:57]
with an extension of six months,
[44:59]
so 18 months. So, that's what
[45:01]
the 18 month is four in the --
[45:04]
bylaw. That's the first thing,
[45:06]
so adding all these three
[45:11]
permits, the five years, that's
[45:13]
why it's proposed, to make sure
[45:15]
that they fit in the five years.
[45:17]
And they have time to complete
[45:21]
the project. If that condition
[45:23]
would not be in the resolution,
[45:25]
that would mean that the sky
[45:30]
will be could be valid as long
[45:32]
as a resolution exists. So, if
[45:35]
that five-year where there is no
[45:37]
condition regarding delays of
[45:39]
the completion of the project,
[45:40]
then that would mean that in
[45:43]
2030, the promoter could come
[45:44]
and ask for a permit. And in the
[45:46]
meantime, there could be nothing
[45:49]
done with that plaza elm. So,
[45:53]
that's why it was suggested by
[45:56]
sea see you and the urban
[45:57]
planning department to council
[45:58]
to add that condition to the
[46:01]
project. So, it makes sure that
[46:03]
yes, it's going to be five
[46:05]
years. It can't seem quite long,
[46:06]
but at the same time, it
[46:09]
segments in time when that
[46:11]
project can be done. After that
[46:12]
five years, what happens? That
[46:14]
resolution is no longer valid,
[46:16]
so the promoter has to do this
[46:17]
all over again.
[46:20]
>> That is fair, it's a fair
[46:22]
response. But I think it's more
[46:24]
of a work around that allows a
[46:29]
developer to work a project
[46:33]
longer by working little
[46:35]
segments of the same parking
[46:37]
lot.
[46:38]
>> There is an important element
[46:40]
on that, it's that right now,
[46:45]
there's -- that goes through the
[46:48]
lot that needs to be placed in
[46:52]
the back of the lot and this is
[46:53]
where that needs to be done.
[46:56]
There is an agreement that needs
[46:57]
to be made with the public works
[46:59]
of the city that means we have
[47:01]
to wait until the referendum
[47:06]
process which is going to happen
[47:07]
if Council decides to vote to
[47:10]
approve the project tonight. We
[47:12]
can explain later the next
[47:14]
steps. But that could be done in
[47:18]
parallel, but as soon as the
[47:20]
work starts, there needs to be
[47:25]
that -- that needs to be moved.
[47:26]
There needs prior work to be
[47:27]
done and then they need to make
[47:28]
sure that everything is secured
[47:30]
and stuff like this, so five
[47:32]
years to be honest is kind of
[47:34]
short to realize a project like
[47:36]
that and it is important to know
[47:39]
that the major work that's going
[47:42]
to cause traffic or trucks
[47:46]
coming in and out and air
[47:51]
pollution or dust and stuff like
[47:52]
that is when they are building
[47:55]
the structure. But after that,
[47:56]
most of the work, like nine
[47:59]
months, 9 to 12 months, is
[48:01]
inside and after that, they put
[48:05]
the exterior -- so 18 months is
[48:07]
kind of fair to a project like
[48:08]
that and in other cities, four
[48:11]
towers of 12 storeys, they can
[48:14]
do it in 18 months. So, for four
[48:17]
storeys and it's not their first
[48:19]
project. So, we think it is a
[48:21]
reasonable time to achieve that
[48:23]
whole project within the five
[48:25]
years that is proposed to
[48:27]
Council to approve.
[48:29]
>> But at the end of the day,
[48:31]
wouldn't it make more sense that
[48:32]
if you start the project, you do
[48:36]
it from a to z? What you're
[48:39]
sounding like you're going to do
[48:40]
partial work because there is
[48:44]
infringements on part of the
[48:46]
lot.
[48:47]
>> No, it's also, and tomorrow,
[48:51]
if Council approved the project
[48:52]
tonight, there is going to be
[48:56]
refused documents on the website
[48:57]
and in that document, there's an
[49:01]
old page that explains why
[49:02]
they're doing it in phases,
[49:04]
because there are some
[49:07]
commercial users right now that
[49:10]
are going to move in the
[49:11]
building, so they're asking to
[49:13]
do demolition of the plaza in
[49:14]
sections and then they have to
[49:16]
make sure they are moving and
[49:18]
then to the other part. This is
[49:20]
all explained in the document
[49:23]
that is going to be uploaded
[49:25]
tomorrow, if Council's approved
[49:27]
tonight. And if I may, there's
[49:29]
another condition that is in the
[49:34]
resolution if Council approved
[49:35]
tonight. There is a committee of
[49:38]
-- the promoter, that is why the
[49:43]
promoter agreed to that after a
[49:45]
public consultation and it's a
[49:48]
good practice. It's being done
[49:49]
in other cities and the fact
[49:51]
that it is going to be in the
[49:53]
resolution, we have to enforce
[49:54]
that it is maintained. There are
[49:57]
some elected officials that are
[49:59]
going to sit on that committee,
[50:03]
so it's --
[50:04]
>> But correct me if I'm wrong,
[50:05]
that committee has absolutely no
[50:08]
rights. The people that --
[50:11]
>> Give somebody else an
[50:12]
opportunity.
[50:13]
>> I have a question, that's
[50:14]
fine because my name is Victoria
[50:15]
and I live at 251 Brighton. I
[50:18]
actually went to one of the
[50:19]
meetings that was held by the
[50:22]
promoter at revolution hair
[50:25]
studio, where it was treated
[50:26]
very poorly by the promoter. I
[50:28]
don't believe that the promoter
[50:30]
has any interest in what the
[50:32]
community has to say and it's
[50:35]
only interested in the bottom
[50:36]
line, obviously, of his project.
[50:38]
So, I would like to know the
[50:42]
past projects that he has done,
[50:44]
what are they? And do they have
[50:47]
any examples? This was a
[50:48]
question that I brought to
[50:50]
Council a few months ago and I
[50:52]
don't think anyone has looked
[50:54]
into it.
[51:01]
>> We have done other --
[51:05]
>> Have you seen the past
[51:06]
projects? Can we have names of
[51:08]
those past projects?
[51:09]
>> Tonight we are approving the
[51:12]
PPCMOI, not the architectural
[51:14]
project.
[51:15]
>> I don't care about the
[51:16]
architectural project. I want to
[51:18]
make sure it gets done and get
[51:19]
some properly.
[51:20]
>> PPCMOI just as I told you
[51:21]
before, is the first step and
[51:24]
then we will come to the
[51:27]
architectural project.
[51:29]
>> It's not about the
[51:30]
architectural project. We saw
[51:31]
the Artemis, how well that went
[51:32]
over.
[51:33]
>> The PPCMOI, if you will have
[51:37]
the opportunity to vote against
[51:38]
it. So, if you want to vote
[51:41]
against it, you will have the
[51:43]
opportunity in the referendum.
[51:45]
>> The referendum is not a good
[51:47]
referendum. It includes a huge
[51:50]
zone that is not part of our
[51:52]
area that does not concern the
[51:56]
residents.
[51:57]
>> Madam, I don't think I've
[51:58]
changed your mind on this topic.
[52:00]
>> I don't think so but I would
[52:01]
like to know if you've looked
[52:02]
into the past projects and what
[52:04]
they are. That is my question.
[52:05]
>> Thank you.
[52:06]
>> -- Monsieur le Maire to
[52:09]
answer your, avec votre
[52:10]
permission question, any project
[52:11]
that we now adopt, whether it's
[52:14]
this one tonight or another one
[52:16]
coming in the next two months or
[52:18]
two years, many projects that
[52:21]
require this type of approval --
[52:27]
this one, whatever, we have put
[52:30]
into our bylaw since at amiss
[52:34]
has become what is now, you
[52:35]
know, the -- we have put into
[52:39]
our bylaws financial guarantees.
[52:43]
So, --
[52:47]
>> Other financial --
[52:51]
>> I'm sorry, I'm a frustrated
[52:53]
resident because -- I wasn't
[52:55]
treated with respect. What tells
[52:58]
me about that is that there is
[53:01]
no open communication, even if
[53:03]
we have this group that's
[53:06]
formed, right? Are we going to
[53:09]
be able to have a any say on
[53:11]
anything? Does that group have
[53:13]
any power at all besides being
[53:14]
there to have an opinion?
[53:20]
>> If I could just add,
[53:22]
Victoria, I think based on some
[53:23]
of the questions -- plaza, that
[53:26]
was something we were concerned
[53:27]
about and the City did contact
[53:31]
the developer, it'd come back
[53:33]
with a whole portfolio. They
[53:34]
have experience, we require that
[53:37]
they had the financial
[53:38]
possession. We were told that
[53:41]
there are some partners behind
[53:42]
our that are very successful.
[53:45]
But as usual, like no company is
[53:47]
going to throw all their assets
[53:49]
into a building, so these are
[53:51]
all different companies, so
[53:52]
there's only so far that you
[53:53]
could go on this thing. In terms
[53:55]
of do they have experience?
[53:58]
>> --
[53:59]
>> Do they know what they're
[54:00]
doing? The answer is yes. That
[54:03]
doesn't change, you know, the
[54:07]
way that he came on to it --
[54:16]
>> Louise, sur la rue Beaudin.
[54:17]
Bon...
[54:18]
>> Now it's going to be the
[54:20]
third question on 275 elm. I
[54:23]
will ask --
[54:24]
>> It's a project!
[54:25]
>> I will ask, if you -- please
[54:30]
lineup because, please lineup
[54:33]
because at one point, we are
[54:35]
going over the period and I will
[54:40]
have asked a question, if the
[54:43]
council wants to continue on the
[54:45]
question period. So, this is the
[54:49]
lineup and that will be the end
[54:51]
of the question at that point.
[54:52]
Thank you.
[54:54]
- Bon. On avait un zonage, vous
[54:59]
l'avez changé pour deux alors il
[55:01]
a l'air de dire que ça va
[55:02]
prendre 5 ans, ça va être par
[55:05]
session. Alors est-ce qu'un
[55:07]
zonage, un permis? Deuxième
[55:09]
zonage, deuxième permis? Ça
[55:11]
pourrait être séparé en deux?
[55:15]
- Je ne sais pas... je n'ai
[55:16]
aucune idée.
[55:17]
(brouhaha)
[55:21]
- Répondre à la demande qui a
[55:23]
été faite par le promoteur...
[55:27]
- Vous séparez ça alors vous
[55:28]
pouvez très bien commencé par
[55:31]
un, pas de permis, après, on
[55:33]
verra pour le deuxième. Là, en
[55:34]
ce moment, on ne sait pas
[55:38]
combien de ma servitude le mur
[55:41]
du stationnement. Ensuite de ça,
[55:45]
je ne sais pas la hauteur. Vous
[55:47]
changez de projet avec celui de
[55:50]
Bolton. On n'a rien de
[55:51]
spécifique. La hauteur du
[55:53]
garage... est-ce que les
[55:57]
appartements ont 8 pieds
[55:58]
seulement ou si ils sont plus
[56:00]
haut que ça?
[56:01]
- En ce moment, vous pourrez
[56:05]
voir les plants dès qu'ils
[56:06]
seront rendus publiques mais les
[56:08]
les ment des maisons de ville
[56:10]
sur Bolton n'apparaissent plus
[56:12]
dans la résolution parce que ces
[56:14]
bâtiments-là ont été rendus,
[56:16]
suite à la consultation
[56:17]
publique, le promoteur a réussi
[56:20]
à réduire les maisons de ville à
[56:22]
deux étages d'une hauteur de
[56:24]
moins de 10 mètres. Ça, c'est ce
[56:28]
qui est prévu au règlement. En
[56:30]
ce moment, ce qu'ils proposent,
[56:31]
à part le fait que ce soit du
[56:33]
résidentiel et que dans la zone,
[56:34]
c'est seulement du commercial
[56:36]
qui est permis, en ce moment,
[56:39]
deux étages et moins de 10
[56:40]
mètres de hauteur, c'est
[56:41]
conforme au règlement pour ça
[56:42]
s'élément. C'est pour ça que ça
[56:44]
a été retiré, ce n'est pas un
[56:46]
élément qui est dérogatoire
[56:47]
maintenant à part usage.
[56:50]
- Moi je parlais en pied
[56:52]
encore... 10 mètres, à ce que
[56:53]
c'est pour chaque étage?
[56:55]
- C'est la hauteur totale du
[56:56]
bâtiment.
[56:57]
- 10 mètres?
[56:58]
- Oui. Un bâtiment comme par
[57:01]
exemple le vôtre, c'est une
[57:03]
hauteur maximale de 9,2 mètres.
[57:04]
- O.K.. Bon, ensuite, le toit,
[57:08]
est-ce qu'il va être plein? On
[57:10]
ne sait pas, vous avez changé...
[57:11]
pour en avant, oups... ça, c'est
[57:15]
correct, je n'en parle pas. Je
[57:17]
parle juste celui qui touche ma
[57:18]
maison.
[57:19]
- Pour le moment, ce qu'on sait,
[57:20]
c'est les paramètres généraux
[57:22]
globaux du projet. La hauteur,
[57:24]
la dimension, la distance par
[57:26]
rapport aux listes de terrain.
[57:28]
Pour ce qui a trait à
[57:29]
l'architecture, comment les
[57:30]
volumes vont être traitées,
[57:32]
est-ce que ça va dépendre d'où
[57:33]
seront situés les fenêtres? Ça,
[57:35]
ce sera dans une phase
[57:36]
subséquente une fois que le
[57:37]
processus référendaire sera
[57:38]
fait. Le comité consultatif
[57:40]
d'urbanisme, c'est le même
[57:41]
processus que pour tous les
[57:44]
projets. Le comité va analyser
[57:47]
la demande en fonction des
[57:48]
critères qui sont établis pour
[57:49]
cette zone et il pourra formuler
[57:51]
des recommandations au conseil
[57:52]
qui décidera d'approuver ou non
[57:54]
l'architecture. C'est vraiment
[57:58]
deux morceaux qui sont séparées.
[57:59]
Pour le moment, c'est vraiment
[58:00]
une bonne façon d'expliquer.
[58:02]
C'est comme si on disait: bon,
[58:03]
ça va être deux poids une
[58:05]
par-dessus l'autre qui vont être
[58:06]
à une telle distance de la ligne
[58:07]
de terrain. Après on, va venir
[58:08]
ajouter des couleurs, le type de
[58:10]
matériaux, des briques, dépend,
[58:11]
des choses comme ça. On n'est
[58:12]
pas encore là comme ça. On est
[58:14]
sur des gros paramètres de la
[58:16]
forme générale du projet.
[58:18]
- Alors, est-ce qu'on va avoir
[58:19]
quelque chose à dire sur
[58:20]
celui-là? Si vous changez de
[58:26]
projet, en arrière de chez
[58:28]
moi... est-ce que j'aurais
[58:29]
quelque chose à dire après quand
[58:32]
vous présentez...
[58:33]
- Quand c'est présenté au pays
[58:34]
a, c'est le comité consultatif
[58:36]
d'urbanisme qui est un comité
[58:40]
consultatif de citoyens. Un élu
[58:41]
qui est président et une autre
[58:44]
élue qui assiste aussi et qui
[58:46]
sont la voix des résidents, dans
[58:48]
le fond, pour s'assurer que ce
[58:49]
règlement-là... pour vérifier
[58:54]
l'architecture, il est bien
[58:55]
appliqué. Tous les projets, il y
[58:58]
en a plusieurs à toutes les
[59:00]
séances du conseil, c'est un
[59:01]
comité de citoyens qui
[59:03]
recommande ou non d'approuver
[59:04]
l'architecture. Ça va être le
[59:06]
même processus.
[59:07]
- Ça va être juste avec le
[59:08]
conseil. Nous autres, on aura
[59:09]
plus rien à dire.
[59:10]
- Pour ce processus-là, non, les
[59:12]
citoyens qui ont quelque chose à
[59:13]
dire, c'est ceux qui sont sur le
[59:15]
comité consultatif d'urbanisme.
[59:17]
- On va se mettre sur le
[59:18]
comité...
[59:19]
(rires)
[59:21]
- Vous avez toujours la période
[59:25]
référendaire où il y aura un
[59:26]
registre. C'est là que vous
[59:30]
aurez quelque chose à dire.
[59:35]
- J'aimerais, après le vote,
[59:36]
vous votez ce soir.
[59:39]
- On va voter sur les PPCMOI,
[59:41]
oui.
[59:43]
- Pour approuver le projet.
[59:46]
- Pour approuver le PPCMOI.
[59:47]
- Eh bien, qu'est-ce que c'est,
[59:48]
au juste?
[59:50]
- Ce n'est pas la même chose.
[59:51]
C'est ça qu'il essayais de vous
[59:53]
expliquer. Un PPCMOI, c'est la
[59:54]
boîte.
[59:55]
- La boîte.
[59:57]
- La façon dont
[1:00:00]
l'architecture... l'architecture
[1:00:01]
de la boîte, ça va être une
[1:00:02]
deuxième phase. Où il y a un
[1:00:05]
PIA. Il faudra passer à travers
[1:00:09]
le même processus.
[1:00:10]
- Mais on n'a rien à dire...
[1:00:12]
- Les consultations avec une
[1:00:16]
recommandation du CCU. Et encore
[1:00:18]
une fois, il y aura un vote
[1:00:22]
référendaire à ce moment-là.
[1:00:24]
- Alors, si jamais après ce
[1:00:26]
soir, après que vous ayez voté,
[1:00:28]
et j'aimerais vous parler...
[1:00:30]
- Vous pouvez me parler
[1:00:31]
n'importe quand.
[1:00:33]
- Ça dépend du vote...
[1:00:34]
(rires)
[1:00:40]
- Comme on dit, en bon français,
[1:00:41]
attachez votre tuque!
[1:00:42]
(rires)
[1:00:45]
je suis plus petite que la
[1:00:47]
moyenne. Bonsoir, je m'appelle
[1:00:49]
Christine, je ne suis pas
[1:00:51]
résidente du secteur en
[1:00:52]
particulier mais j'ai suivi, je
[1:00:54]
suis résidente de Beaconsfield
[1:00:55]
et j'ai suivi depuis le début de
[1:00:59]
l'histoire du redéveloppement du
[1:01:01]
Plaza elle-même. Je vais faire
[1:01:02]
mon commentaire. J'ai une
[1:01:03]
question à la fin du
[1:01:04]
commentaire. Je vais commencer
[1:01:05]
en français et je vais changer à
[1:01:06]
l'anglais parce que je pense que
[1:01:07]
c'est bilingue dans la salle. Je
[1:01:11]
pense que la question du CIO
[1:01:13]
est, le fameux taux
[1:01:15]
d'implantation qui est souvent
[1:01:16]
discutée, Jason n'est pas là, je
[1:01:17]
ne corrigerait s'il n'était pas
[1:01:18]
là... il s'est trompé dans ses
[1:01:21]
calculs. Mais le 1,18... tout
[1:01:26]
ça, dans le fond, c'est des
[1:01:27]
chiffres qui, dans l'absolu, ne
[1:01:28]
veulent pas dire grand-chose. À
[1:01:30]
Montréal, vous pouvez avoir un
[1:01:31]
projet qui est en plein
[1:01:33]
centre-ville. Ça devient un COS
[1:01:40]
des deux ou des deux 0... 2,5.
[1:01:42]
(---)
[1:01:43]
ça devient un COS des un ou de
[1:01:45]
1,5. La question, c'est le
[1:01:47]
différentiel et comment il
[1:01:48]
s'intègre dans le cadre
[1:01:49]
existant. C'est d'ailleurs même
[1:01:52]
mentionné dans vos règlements.
[1:01:55]
L'important, c'est que le projet
[1:01:57]
soit intégré dans le cadre bâti
[1:02:00]
existant et comment on perd avec
[1:02:01]
les environ. Ici, à
[1:02:03]
Beaconsfield, un COS de 0,8 ou
[1:02:06]
un, c'est normal pour un taux
[1:02:07]
familial, pour un quartier
[1:02:08]
familial. Un COS de 1,8, c'est
[1:02:12]
quasiment doubler, si ce n'est
[1:02:13]
pas plus, étant donné l'impact
[1:02:14]
sur les auteurs, du calcul des
[1:02:17]
unités et des densité possibles.
[1:02:18]
Je pense que là demeure l'enjeu
[1:02:21]
principal par rapport à la
[1:02:22]
population dans le secteur. Ce
[1:02:23]
que vous n'êtes pas dans un
[1:02:24]
secteur du centre-ville, vous
[1:02:25]
n'êtes pas dans un secteur non
[1:02:26]
plus comme le projet dus à la
[1:02:28]
mise... qui malgré son taux du
[1:02:32]
1,6, et madame Mireille l'a bien
[1:02:35]
expliqué, le secteur du
[1:02:36]
(---)
[1:02:37]
est un secteur particulier. Il
[1:02:38]
n'a pas le même cadre bâti
[1:02:39]
environnants. Ce projet-là,
[1:02:43]
croit que similaires, n'aura pas
[1:02:45]
le même impact, vous avez des
[1:02:49]
étages, des bâtiments à quatre
[1:02:50]
étages en plein milieu, je
[1:02:52]
remarque et en passant, je
[1:02:53]
voulais passer le bravo à
[1:02:54]
l'équipe de la ville pour avoir
[1:02:56]
quand même commissionné une
[1:02:57]
deuxième étude de trafic. Le
[1:03:01]
timing était malheureux parce
[1:03:02]
que tout le monde était en grève
[1:03:03]
mais vous l'avez quand même
[1:03:04]
fait, vous avez imposé des
[1:03:05]
changements au promoteur. Il y a
[1:03:07]
clairement une volonté d'écouter
[1:03:08]
les citoyens. Le promoteur s'est
[1:03:11]
mis d'accord pour ces
[1:03:12]
aspects-là. Cela dit, et là, je
[1:03:13]
vais passer en anglais... It's
[1:03:16]
cosmetic changes. So the bulk of
[1:03:18]
the issue remains the density
[1:03:20]
that essentially is way too high
[1:03:22]
for that neighbourhood. So yes,
[1:03:25]
the residents on both, it's
[1:03:26]
going to be a bit better for
[1:03:27]
them, they have one floor less.
[1:03:30]
But everyone around is still
[1:03:31]
going to suffer a devastating
[1:03:34]
impact of a huge increase
[1:03:35]
compared to the neighbourhood.
[1:03:37]
So my question, and I think
[1:03:41]
there's a lot of goodwill on the
[1:03:42]
part of the city, but I don't
[1:03:44]
know to what degree the
[1:03:46]
relationship is transparent with
[1:03:47]
the developer. Clearly there's
[1:03:49]
good reason for the City to
[1:03:51]
approve a project like this,
[1:03:53]
it's understandable. And
[1:03:54]
obviously the developer want to
[1:03:55]
maximize profit, that's also
[1:03:57]
understandable. But it's not
[1:03:58]
worth the cost and sacrifice for
[1:04:00]
citizens in that area. There
[1:04:01]
will come other projects. And if
[1:04:03]
ever, my question is, has a
[1:04:05]
development mention the fact
[1:04:07]
that in two years the bylaw
[1:04:09]
might change in favour of
[1:04:12]
developers? He mentioned that?
[1:04:13]
Okay.
[1:04:14]
>> No, he did not mention that.
[1:04:16]
>> He knew?
[1:04:18]
>> No, but it's a fact. What you
[1:04:19]
just said is an absolute fact.
[1:04:20]
>> It's an absolute packed.
[1:04:22]
>> In two years, you can put ten
[1:04:24]
storeys.
[1:04:25]
>> So what's gonna happen for
[1:04:26]
the benefit of everybody? In ten
[1:04:27]
years, there will be a change of
[1:04:29]
provincial laws or by-laws that
[1:04:31]
is going to allow suppression of
[1:04:34]
citizen participation in
[1:04:36]
consultations. So this will
[1:04:37]
probably be one of the last
[1:04:38]
projects that gets to
[1:04:39]
participate. That being said,
[1:04:41]
and I heard through the
[1:04:42]
grapevine that the developer
[1:04:45]
mentioned that if let's say
[1:04:47]
there was a no or a rejection of
[1:04:50]
the project, he would sit on the
[1:04:51]
property for two years. I would
[1:04:53]
caution you not to believe that.
[1:04:55]
It's an empty threat. It happens
[1:04:56]
in real estate when the
[1:04:58]
developer has no other arguments
[1:05:00]
in his at the end of the rope
[1:05:02]
and scared.
[1:05:03]
>> Yeah, but most important, no
[1:05:05]
matter who is going to
[1:05:07]
eventually own that -- in two
[1:05:10]
years, somebody is going to own
[1:05:13]
it, and they can do whatever
[1:05:15]
they will want because the
[1:05:17]
demand will actually change,
[1:05:20]
increase the density and will
[1:05:25]
allow, and I will mention that
[1:05:29]
probably a much bigger project.
[1:05:31]
And right, now we are --
[1:05:34]
>> The City will conserve its
[1:05:36]
power though. The citizens will
[1:05:37]
not have much power left, but
[1:05:38]
the city will -- especially in
[1:05:43]
-- the City does have.
[1:05:45]
>> You know, we -- there is not
[1:05:47]
too many opportunities for
[1:05:49]
development in this city. And we
[1:05:50]
will have to consider seriously
[1:05:54]
any development that is being
[1:05:55]
proposed to us.
[1:05:57]
>> So assuming --
[1:05:58]
>> It's either that, or -- keep
[1:06:02]
going up, and they will go up.
[1:06:04]
And a lot more, because --
[1:06:06]
>> I hear you, I understand. Is
[1:06:09]
there a reason why you didn't
[1:06:13]
request a reduction of a number
[1:06:14]
of units to the developer?
[1:06:16]
>> We have already gone through
[1:06:17]
that.
[1:06:18]
>> And what did they say?
[1:06:19]
>> The project that's being
[1:06:21]
proposed to us is now less than
[1:06:24]
original. It's now -- it becomes
[1:06:29]
an economics situation.
[1:06:30]
>> The developer?
[1:06:32]
>> There comes a point where
[1:06:34]
he's gonna say no, I can't do
[1:06:36]
that project, because it's not
[1:06:38]
economical for me to do it. At
[1:06:40]
that point, he can sell it to
[1:06:42]
somebody else, whatever is going
[1:06:43]
to happen. But the point is you
[1:06:47]
brought so much. We have some
[1:06:50]
control over what's being done
[1:06:52]
now. In two, years we will not.
[1:06:54]
>> You will have less in terms
[1:06:56]
of the citizens but you'll still
[1:06:58]
have control over your PPCMOI.
[1:07:01]
So for the amount of changes --
[1:07:03]
>> We are forced to increase our
[1:07:04]
density by quite a bit.
[1:07:08]
>> So then what I would say is,
[1:07:10]
keep in mind you still have a
[1:07:11]
lot of power with the developer,
[1:07:13]
you can still request a lot of
[1:07:15]
things. And no developer in his
[1:07:17]
right mind is going to sit on a
[1:07:18]
property for two years, okay? So
[1:07:22]
they want to develop the
[1:07:23]
property.
[1:07:24]
>> What is being proposed now by
[1:07:27]
the promoter, with the
[1:07:29]
discussions that we've had,
[1:07:31]
that's the limit that he is
[1:07:32]
prepared to accept. Otherwise
[1:07:33]
there is no project.
[1:07:35]
>> So in that case, what I would
[1:07:37]
recommend, assuming you pass the
[1:07:39]
-- assuming that's what will
[1:07:40]
happen, in the neighbourhood
[1:07:42]
community, please include the
[1:07:44]
daycare, because it's not
[1:07:46]
included right now.
[1:07:47]
>> We are going to have a good
[1:07:49]
neighbour committee.
[1:07:50]
>> And also new construction
[1:07:51]
agreement with the developer,
[1:07:53]
make sure you include all the
[1:07:55]
guarantees and also the sound
[1:07:56]
barrier and the air pollution
[1:07:58]
barrier during construction for
[1:07:59]
the daycare, because it's a
[1:08:01]
minor cost for them and it can
[1:08:04]
do a lot to requests the air
[1:08:06]
transfer with the daycare.
[1:08:08]
>> I'm sure that is being
[1:08:09]
considered right now.
[1:08:10]
>> Okay. Thank you.
[1:08:12]
[Applause]
[1:08:18]
>> Hello, it's to fallen from --
[1:08:22]
I had a question from you guys
[1:08:26]
in terms of -- oh, sorry, tall
[1:08:29]
person problems. So I've a
[1:08:31]
question for you guys actually.
[1:08:33]
When this was originally
[1:08:35]
floated, the whole prospect of
[1:08:36]
this being a numbered company
[1:08:39]
was raised and people are
[1:08:40]
understandably concerned. Now,
[1:08:41]
we do understand that you have
[1:08:43]
spoken with these people behind
[1:08:45]
the developers, well, behind the
[1:08:47]
development company. My question
[1:08:49]
is, has the city done an actual
[1:08:52]
due diligence on these people?
[1:08:55]
Because saying that someone has
[1:08:56]
money to bankroll this --
[1:08:59]
>> Yes, we have. We have and we
[1:09:03]
know that the people behind the
[1:09:04]
project, the financiers behind
[1:09:07]
the project, have lots of money.
[1:09:10]
>> So where is the documentation
[1:09:11]
for this?
[1:09:12]
[Laughter]
[1:09:14]
It's -- you can ask the promoter
[1:09:16]
to give it to you, because it's
[1:09:20]
not available and it's not
[1:09:23]
public.
[1:09:24]
>> So we have someone who is not
[1:09:27]
--
[1:09:28]
>> It's not public, no.
[1:09:29]
>> I just want to establish that
[1:09:31]
was the case.
[1:09:32]
>> Thank you very much.
[1:09:38]
>> Good evening everyone, my
[1:09:39]
name is -- I'm the owner of the
[1:09:43]
daycare. Tonight, I stand before
[1:09:46]
you to advocate for the future
[1:09:49]
of -- Canada. Our 80 children.
[1:09:53]
The daycare director -- has
[1:09:58]
presented 1 million aspects of
[1:09:59]
the project's impact on children
[1:10:03]
aged zero to five. I want to
[1:10:06]
emphasize that when you vote for
[1:10:09]
this project, it's not just
[1:10:10]
about the children being
[1:10:12]
directly involved, nor is it
[1:10:15]
only about financial gains.
[1:10:18]
Early childhood education is a
[1:10:21]
collective responsibility that
[1:10:22]
shapes the future of our
[1:10:25]
society. I believe that each
[1:10:29]
councillor conscience, sense of
[1:10:30]
responsibility, mission, and --
[1:10:33]
I urge you to consider these
[1:10:36]
values as you make your
[1:10:37]
decision. Thank you.
[1:10:39]
>> Thank you very much.
[1:10:40]
[Applause]
[1:10:46]
>> Hi, I was just wondering if
[1:10:48]
there's any other residential
[1:10:49]
area in Beaconsfield that has so
[1:10:51]
many by-laws change towards
[1:10:53]
project?
[1:10:55]
>> Yes, Adamus.
[1:10:56]
[Laughter]
[1:10:57]
>> That's it? The
[1:10:59]
>> In fact, the Adamus project
[1:11:02]
is more massive than the one
[1:11:04]
that's there.
[1:11:05]
>> Does the city consider it it
[1:11:07]
success?
[1:11:08]
>> Eventually, it's completed
[1:11:09]
the way it was proposed to.
[1:11:14]
Unfortunately, we have another
[1:11:15]
issue with that house, because
[1:11:18]
obviously the project should
[1:11:20]
have been done a long time ago.
[1:11:23]
But that project is much more
[1:11:25]
massive than the one on elm.
[1:11:29]
>> Fair enough. Now, the
[1:11:32]
motivation behind all of these
[1:11:33]
adjustments, because I'm
[1:11:34]
talking, like, those are big
[1:11:36]
projects, like elm is going to
[1:11:38]
be. But as a resident of
[1:11:41]
Beaconsfield, I've had to
[1:11:42]
constantly go back to the city
[1:11:43]
for different permits and bylaws
[1:11:44]
and making sure, like, your
[1:11:47]
fence here has to be lowered by
[1:11:49]
a couple inches or your paint is
[1:11:50]
white, I want to change it to
[1:11:52]
off-white, no, you can't do
[1:11:53]
that. There's been a lot of back
[1:11:55]
and forth about little things.
[1:11:57]
>> Keep in mind that here we are
[1:11:59]
going from a commercial sewn or
[1:12:04]
commercial to a residential. And
[1:12:07]
that requires a lot of changes
[1:12:09]
from what it was before. The
[1:12:12]
vocation is completely
[1:12:13]
different. So that's why we need
[1:12:18]
to allow a lot of changes in the
[1:12:20]
PPCMOI to be able to accommodate
[1:12:23]
a presidential.
[1:12:24]
>> Do you feel like the by-laws
[1:12:26]
for everybody should be adjusted
[1:12:28]
and then? No. So just for
[1:12:31]
certain cases we will have
[1:12:32]
exceptions? Okay. And then my
[1:12:35]
final question is we did a
[1:12:37]
traffic study. Did anyone on the
[1:12:42]
City team notify you that there
[1:12:44]
was a public school strike going
[1:12:46]
on during the time that it was
[1:12:49]
being -- nobody brought this up?
[1:12:54]
>> Yes.
[1:12:55]
>> Yeah.
[1:12:56]
>> Sorry, what was that?
[1:12:58]
>> What was --
[1:12:59]
[Laughter]
[1:13:01]
Shot
[1:13:02]
>> Yeah, we know that it was
[1:13:04]
done, there were some days where
[1:13:05]
there are some strikes, there
[1:13:06]
was a day where there's a
[1:13:07]
snowstorm, another with a water
[1:13:09]
break. So there's always a
[1:13:10]
reason.
[1:13:11]
>> I think it was a week.
[1:13:12]
>> It was a seven-week strike.
[1:13:14]
>> We cannot control what other
[1:13:17]
third parties do, if they go on
[1:13:19]
strike or not. We were asked to
[1:13:22]
produce a new -- study, we
[1:13:24]
started it. There was a strike,
[1:13:25]
so there is a little less
[1:13:27]
traffic. But at the end of the
[1:13:29]
day, I don't think that will
[1:13:32]
have changed the issue of the
[1:13:37]
recommendations, or the analysis
[1:13:38]
that was done by the experts.
[1:13:41]
They did seven intersections.
[1:13:45]
How many days, do you remember?
[1:13:48]
[Inaudible]
[1:13:49]
Three days, but it wasn't during
[1:13:51]
the strike. It was planned to be
[1:13:53]
done in the first week -- the
[1:13:56]
last week of November, but it's
[1:13:59]
been moved so they could have
[1:14:01]
the right count. So it wasn't
[1:14:04]
during the strike. Some schools
[1:14:07]
in Beaconsfield were still in
[1:14:08]
strike, but not the English
[1:14:10]
school board. Some of the
[1:14:12]
schools on the north side. So
[1:14:13]
that's why it's been moved. But
[1:14:15]
it's been really -- we had the
[1:14:18]
moved because of that. We want
[1:14:20]
to make sure the numbers were
[1:14:22]
correct.
[1:14:23]
>> And this was -- traffic study
[1:14:26]
--
[1:14:27]
>> For done.
[1:14:28]
>> So we did to. The residents
[1:14:31]
did not like it. And we did a
[1:14:33]
second one.
[1:14:34]
>> So, the first one suggested
[1:14:36]
that a sidewalk be built. Will
[1:14:38]
the City commit to building this
[1:14:40]
sidewalk before the de
[1:14:41]
construction or demolition?
[1:14:43]
>> The first one -- people that
[1:14:46]
we had ignored would ignore
[1:14:50]
Beaconsfield station.
[1:14:51]
>> Correct.
[1:14:53]
>> Actually, it's halfway
[1:14:54]
between the two. So it has an
[1:14:57]
impact on whether it will be on
[1:14:59]
Beaconsfield station or --
[1:15:01]
station.
[1:15:02]
>> Sure, but the question was
[1:15:03]
about the sidewalk. Okay, it
[1:15:07]
will be built before the
[1:15:08]
demolition?
[1:15:09]
>> We are going to do a
[1:15:11]
sidewalk. Yeah, it's part of the
[1:15:12]
project.
[1:15:13]
>> Sorry, I'm getting two
[1:15:14]
different answers. Will it be
[1:15:15]
done before the demolition?
[1:15:17]
>> I don't remember if it's
[1:15:18]
before the demolition, that is
[1:15:19]
part of the overall project.
[1:15:24]
>> Usually, you don't want to do
[1:15:26]
before.
[1:15:27]
>> Usually, infrastructure work
[1:15:29]
can occur like that, it's done
[1:15:32]
after. Because of all the
[1:15:33]
construction that's got to be
[1:15:34]
done, like for other projects,
[1:15:36]
even for a single house. They do
[1:15:40]
break the sidewalk. So it would
[1:15:42]
be a good decision to have them
[1:15:44]
make the sidewalk beforehand.
[1:15:46]
>> I understand that. But for
[1:15:49]
the daycare and all the kids and
[1:15:50]
just general population, when
[1:15:52]
you have large trucks moving all
[1:15:55]
the debris, wouldn't it make
[1:15:56]
sense to have some protected
[1:16:00]
area that they could walk to
[1:16:01]
parks?
[1:16:02]
>> I think we can take note of
[1:16:04]
your comment.
[1:16:05]
>> We will take a look at it,
[1:16:06]
thank you.
[1:16:09]
>> One public work --
[1:16:10]
>> Thank you.
[1:16:11]
>> I think you are the last one?
[1:16:14]
>> We are together. We are from
[1:16:17]
Elm plaza. We both have
[1:16:18]
businesses there. My name is
[1:16:21]
Tamara, I own revolution hair
[1:16:22]
studio.
[1:16:23]
>> I work at the animal
[1:16:24]
hospital.
[1:16:25]
>> I've been unattended for 30
[1:16:26]
years with my mom and my uncle.
[1:16:27]
We've been paying taxes in the
[1:16:29]
plaza since the 80s. And we've
[1:16:31]
seen this go on a few times over
[1:16:33]
the years. And here we are
[1:16:35]
again. My concern is the plaza
[1:16:37]
is falling apart, and the safety
[1:16:39]
of the plaza is an issue. My
[1:16:42]
clients do not feel safe coming
[1:16:43]
in. I have clients from one year
[1:16:46]
old to sum that are in their
[1:16:47]
90s. The older ones -- one of
[1:16:50]
them has even stop driving, and
[1:16:51]
she takes a taxi, because she is
[1:16:54]
too scared to walk in the
[1:16:55]
parking lot to the salon. The
[1:16:57]
bricks are falling off, not just
[1:16:59]
on one pillow or, they're all
[1:17:00]
starting to fall on the floor.
[1:17:02]
There are potholes everywhere.
[1:17:04]
The access ramp for the
[1:17:05]
wheelchair is full of potholes
[1:17:06]
and rocks. And these sort caps
[1:17:09]
are off. There were no lights in
[1:17:11]
the plaza from the fall until
[1:17:13]
the end of the winter, when the
[1:17:15]
days started getting longer. Not
[1:17:17]
one light. My employee fell, she
[1:17:19]
hurt her knee, she could not
[1:17:20]
come to work for a few days. I
[1:17:24]
mean, how is this acceptable?
[1:17:25]
And if this is going on now, how
[1:17:27]
is it gonna be safe well he is
[1:17:29]
building? What am I going to do
[1:17:31]
to -- what is he going to do to
[1:17:33]
ensure the safety of the tenants
[1:17:34]
that are still there while he is
[1:17:35]
doing his construction? I don't
[1:17:37]
understand how it is going to
[1:17:38]
work.
[1:17:39]
>> So I'll just add to that
[1:17:40]
before, just to reiterate, that
[1:17:42]
our question to Council, really
[1:17:44]
our comment to Council and the
[1:17:46]
citizens of Beaconsfield, is
[1:17:48]
that our experience when the
[1:17:49]
promoter has not been a positive
[1:17:51]
one for the past 1.5 years that
[1:17:53]
we've been working with them.
[1:17:56]
And as a result, we are very
[1:17:58]
concerned about the project in
[1:18:00]
itself and whether or not it
[1:18:01]
will be safe, whether he will be
[1:18:04]
or they will be ensuring that
[1:18:06]
things are done on time, that
[1:18:08]
the streets are safe, that --
[1:18:11]
and we understand, we don't
[1:18:12]
really have the same anyways,
[1:18:14]
because we are renters. We don't
[1:18:16]
own the property. But our
[1:18:18]
clients come to us, their pets,
[1:18:22]
and their safety is important to
[1:18:23]
us, as is the ability for us to
[1:18:25]
continue to have our businesses
[1:18:28]
actually provide a service to
[1:18:29]
this community. So we are asking
[1:18:31]
that Council consider that
[1:18:33]
history that we have this
[1:18:34]
particular promoter when you are
[1:18:36]
coming to vote today, as well to
[1:18:38]
the citizens if it does go to a
[1:18:39]
yes to please support us, as
[1:18:41]
well as the daycare, which will
[1:18:43]
be very highly affected in the
[1:18:45]
coming years.
[1:18:46]
>> I understand that you are
[1:18:49]
going to --
[1:18:50]
[Applause]
[1:18:51]
>> Continue to operate with a
[1:18:54]
new -- after the development,
[1:18:56]
there will be room for you to
[1:18:58]
continue to operate. Is that
[1:19:00]
correct?
[1:19:01]
>> Well, what the developer or
[1:19:02]
promoted says and what he says
[1:19:04]
to us and what we see in these
[1:19:05]
plans that have been passed her
[1:19:07]
two very different things.
[1:19:10]
>> And in the meantime, what
[1:19:12]
about in the meantime, we have a
[1:19:14]
lease.
[1:19:15]
>> This is something we --
[1:19:18]
>> I understand.
[1:19:19]
>> We can't tell the promoter
[1:19:21]
what to do.
[1:19:22]
>> Like there's some safety,
[1:19:23]
like has to follow certain --
[1:19:26]
have yet a talk with him?
[1:19:27]
>> Yes, I have.
[1:19:29]
>> We have had to send leaguer
[1:19:32]
legal letters to him about
[1:19:34]
safety at our place.
[1:19:35]
>> -- come to the city, that's
[1:19:37]
what I was recommended to do. So
[1:19:39]
I just don't know what to do
[1:19:40]
right now, because the sword
[1:19:45]
caps are not on the whole, like,
[1:19:47]
the cars are driving in and
[1:19:49]
following in the sewer.
[1:19:53]
>> Well, I don't really have any
[1:19:54]
answers for you. I know that a
[1:19:56]
lot of people have moved out of
[1:19:57]
there.
[1:19:58]
>> I know, but I have been there
[1:19:59]
for 38 years, I can just up and
[1:20:01]
leave.
[1:20:02]
>> Yeah, and you are what I call
[1:20:04]
a destination business, will
[1:20:07]
survive this development because
[1:20:10]
that's the type of business that
[1:20:13]
if he is smart, as a developer,
[1:20:16]
he will make sure that he keeps
[1:20:19]
you happy until he's able.
[1:20:22]
>> So, far yeah.
[1:20:23]
>> I can't talk for him.
[1:20:25]
>> Yeah, already.
[1:20:33]
>> Okay, we will now -- we've
[1:20:35]
been into it for 1.5 hours, an
[1:20:38]
hour 20 minutes, so we will now
[1:20:39]
move on to the agenda.
[1:20:51]
Approbation du procès-verbal de
[1:20:53]
la séance ordinaire du Conseil
[1:20:54]
de la Ville de Beaconsfield du
[1:20:55]
26 février 2024.
[1:20:56]
- Je propose.
[1:20:57]
- J'appuie.
[1:20:58]
- En faveur.
[1:20:59]
- Approval of the minutes à
[1:21:00]
l'unamimité. of the City of
[1:21:01]
Beaconsfield's special Council
[1:21:02]
meeting of March 11, 2024, at
[1:21:03]
5:30 p.m.
[1:21:06]
>> Opposed.
[1:21:07]
>> I second.
[1:21:08]
>> All in favour?
[1:21:10]
- À l'unamimité. Octroi du
[1:21:13]
contrat 599-23-GC concernant la
[1:21:14]
réhabilitation de la jetée
[1:21:15]
Centennial au plus bas
[1:21:16]
soumissionnaire conforme, soit
[1:21:18]
Pronex Excavation inc., pour la
[1:21:19]
somme de 3 259 946,97 $, toutes
[1:21:22]
taxes incluses.
[1:21:28]
- Je propose.
[1:21:41]
>> Motion carried. Awarding of
[1:21:43]
contract 650-24-GC for the
[1:21:46]
concrete sidewalk repair to the
[1:21:47]
lowest conforming bidder, Les
[1:21:48]
Entreprises Ventec Inc., in the
[1:21:49]
amount of $161,079.98, all taxes
[1:21:57]
included
[1:22:00]
>> Proposed.
[1:22:01]
>> Seconded.
[1:22:03]
>> In favour? Unanimous.
[1:22:05]
- Merci. Octroi du contrat
[1:22:08]
650-24-GC concernant la
[1:22:09]
réfection des trottoirs au plus
[1:22:10]
bas soumissionnaire conforme,
[1:22:12]
soit Les Entreprises Ventec
[1:22:13]
inc., pour la somme de
[1:22:15]
161 079,98 $, toutes taxes
[1:22:17]
incluses.
[1:22:23]
(---)
[1:22:25]
Insituform Technologies limitée,
[1:22:26]
pour la somme de 423 423,00 $,
[1:22:27]
toutes taxes incluses.
[1:22:29]
- À l'unamimité.. Awarding of
[1:22:31]
contract TP 2024-01 for the
[1:22:32]
supply and planting of trees in
[1:22:35]
parks and on municipal rights of
[1:22:36]
way in the spring of 2024 to the
[1:22:37]
lowest conforming bidder,
[1:22:42]
Terrassement Technick, in the
[1:22:43]
amount of $152 745,44, all taxes
[1:22:45]
included
[1:22:53]
>> I propose.
[1:22:54]
>> I
[1:22:56]
- En faveur. Second. In
[1:22:58]
- Favour? À l'unamimité.
[1:23:01]
Renouvellement du contrat TP
[1:23:03]
2018-12 pour la collecte et le
[1:23:05]
transport des matières
[1:23:06]
recyclables pour une année, du
[1:23:08]
1er avril 2024 au 31 mars 2025,
[1:23:10]
avec Services Ricova inc. au
[1:23:11]
coût approximatif de 386 198 $,
[1:23:17]
toutes taxes incluses.
[1:23:22]
>> Second. In favour? À
[1:23:26]
l'unamimité. Mandate to the
[1:23:27]
Union des municipalités du
[1:23:28]
Québec
[1:23:29]
(UMQ)
[1:23:30]
with regard to the group for the
[1:23:31]
purchase in common of liability
[1:23:33]
insurance for skateboard parks,
[1:23:35]
BMX park tracks and similar
[1:23:41]
installations for 2024 to 2029.
[1:23:43]
>> I propose.
[1:23:47]
>> I, in favour. À l'unamimité.
[1:23:51]
Approbation de la liste des
[1:23:52]
comptes à payer au 25 mars 2024
[1:23:54]
et de la liste des paiements
[1:23:55]
préautorisés pour la période du
[1:23:56]
15 février 2024 au 25 février
[1:23:58]
2024 et du 27 février 2024 au 13
[1:24:00]
mars 2024, pour un déboursé
[1:24:02]
total de 17 584 462,29 $.
[1:24:12]
- Malheureusement, je n'ai pas
[1:24:13]
tous les détails du 17 millions
[1:24:16]
comme normalement... mais je
[1:24:19]
peux vous mentionner que ça
[1:24:22]
inclut les paiements des
[1:24:25]
quote-part pour la deuxième
[1:24:26]
moitié de l'année. En fait, la
[1:24:31]
première moitié de la fin de
[1:24:32]
l'année, c'est ça? Et nous
[1:24:35]
allons payer sous protêt ses
[1:24:40]
quotes-parts. La plupart d'entre
[1:24:43]
vous sont au courant that we...
[1:24:46]
have a lawsuit against Montréal
[1:24:50]
on the sharing of expenses and
[1:24:53]
the formula. So we are
[1:24:55]
continuing to pay the -- but we
[1:24:59]
are paying that under protest
[1:25:01]
hoping that eventually it will
[1:25:03]
all be settled in court.
[1:25:24]
Deposit of the Treasurer's
[1:25:25]
transactions report in
[1:25:26]
compliance with section 513 of
[1:25:27]
an Act respecting elections and
[1:25:28]
referendums in municipalities.
[1:25:33]
Il s'agit d'un dépôt.
[1:25:38]
Dépôt de la liste des
[1:25:39]
remboursements des dépenses de
[1:25:40]
recherche et de soutien des
[1:25:41]
conseillers autorisés par la
[1:25:42]
Ville de Beaconsfield pendant
[1:25:43]
l'exercice financier 2023
[1:25:44]
conformément à l'article 31.5.5
[1:25:45]
de la Loi sur le traitement des
[1:25:46]
élus municipaux.
[1:25:51]
>> Approval of the -- lawn
[1:25:52]
bowling Club and the the City
[1:25:53]
for the Herb Linder Annex and
[1:25:54]
the lawn bowling greens for the
[1:25:55]
year 2024
[1:25:59]
>> I propose. In
[1:26:00]
- Favour? À l'unamimité. à
[1:26:04]
l'unamimité. Approbation d'un
[1:26:05]
appui financier de 500 $ à
[1:26:06]
Services à la Famille AMCAL pour
[1:26:07]
l'année 2024.
[1:26:12]
- En faveur.
[1:26:13]
- Approval of a $2,000 à
[1:26:17]
l'unamimité. contribution to
[1:26:21]
West Island community resource
[1:26:22]
center for the year 2024.
[1:26:25]
>> Opposed.
[1:26:26]
>> Second.
[1:26:27]
>> In favour. À l'unamimité.
[1:26:32]
Approbation d'un appui financier
[1:26:33]
de 1 000 $ à Centre de
[1:26:34]
ressources communautaires de
[1:26:35]
l'Ouestde-l'Île pour l'année
[1:26:36]
2024.
[1:26:37]
(---)
[1:26:38]
Approbation d'un appui financier
[1:26:39]
de 2 000 $ à NOVA
[1:26:40]
l'Ouest-de-l'Île pour l'année
[1:26:41]
2024 Approval of a $3,000.
[1:26:42]
- À l'unamimité. contribution to
[1:26:43]
West Island Association for the
[1:26:44]
Intellectually Handicapped for
[1:26:45]
the year 2024.
[1:26:49]
>> Proposed.
[1:26:57]
- Oui, j'appuie.
[1:26:59]
- En faveur.
[1:27:00]
(rires)
[1:27:02]
- À l'unamimité.
[1:27:08]
Approbation d'un appui financier
[1:27:09]
de 6 500 $ pour l'entretien
[1:27:11]
annuel des espaces verts entre
[1:27:12]
le Club de boulingrin de
[1:27:13]
Beaconsfield et la Ville de
[1:27:15]
Beaconsfield pour l'année 2024.
[1:27:19]
- Proposé.
[1:27:24]
- Approval of a financial à
[1:27:27]
l'unamimité. contribution of
[1:27:28]
$170,000 for renovations of the
[1:27:30]
Beacon Hill pool and
[1:27:31]
authorization to sign the
[1:27:32]
agreement between the City of
[1:27:33]
Beaconsfield and Beacon Hill
[1:27:34]
Swimming Pool Club.
[1:27:39]
>> Proposed.
[1:27:40]
>> Second.
[1:27:41]
>> In favour. À l'unamimité.
[1:27:44]
Ordonnance pour vendre les
[1:27:46]
immeubles comportant des soldes
[1:27:47]
de taxes impayées pour 2022 et
[1:27:48]
2023 aux enchères publiques et
[1:27:49]
dépôt par le trésorier de la
[1:27:51]
liste de ces immeubles.
[1:27:56]
- Proposé.
[1:27:57]
- Appuyé.
[1:27:58]
- En faveur.
[1:27:59]
- À l'unamimité. Filing and
[1:28:01]
notice of motion of Draft By-law
[1:28:03]
BEAC-153 entitled « By-law
[1:28:05]
authorizing a loan of $3,392,077
[1:28:08]
for the rehabilitation of
[1:28:13]
Centennial jetty, 288
[1:28:16]
Beaconsfield, Beaconsfield ».
[1:28:22]
It's a notice of motion.
[1:28:23]
>> I give the notice of motion.
[1:28:25]
>> Thank you but. Dépôt et avis
[1:28:32]
de motion du projet de Règlement
[1:28:33]
BEAC-159 intitulé « Règlement
[1:28:34]
autorisant un emprunt de
[1:28:37]
1 149 113,18 $ pour des travaux
[1:28:38]
de construction pour le bassin
[1:28:39]
pluvial Tower et Elm ».
[1:28:42]
- Je donne un avis de motion.
[1:28:43]
- Merci. Adoption of By-law
[1:28:46]
BEAC-157 entitled « By-law
[1:28:48]
authorizing a loan of $1,332,260
[1:28:50]
for the structural
[1:28:58]
rehabilitation work of sanitary
[1:28:59]
sewer pipes for various streets,
[1:29:01]
as well as for the structural
[1:29:04]
rehabilitation work of water
[1:29:06]
mains for various streets. This
[1:29:16]
by-law is for a loan for
[1:29:18]
municipal infrastructures. There
[1:29:19]
is more registered to be held,
[1:29:21]
since it falls under -- cases of
[1:29:25]
loan bylaw, which we do not
[1:29:26]
require the approval of
[1:29:27]
qualified voters, as per the --
[1:29:29]
and it will be applied to the
[1:29:32]
whole territory of the city of
[1:29:36]
Beaconsfield.
[1:29:37]
>> I second.
[1:29:41]
- À l'unamimité.
[1:29:42]
- Oui.
[1:29:45]
- Dépôt par la greffière du
[1:29:46]
certificat relatif aux résultats
[1:29:47]
de la demande d'approbation
[1:29:49]
référendaire tenue le 19 et 20
[1:29:50]
mars 2024 concernant le
[1:29:52]
Règlement BEAC-160 intitulé «
[1:29:54]
Règlement autorisant un emprunt
[1:29:55]
de 2 333 040,35 $ pour des
[1:29:59]
honoraires professionnels
[1:30:00]
(ingénieurs et architectes)
[1:30:02]
pour la préparation des plans et
[1:30:03]
devis, concernant des travaux de
[1:30:05]
rénovation et mise aux normes du
[1:30:06]
Centre récréatif de Beaconsfield
[1:30:08]
». Le registre s'est tenu. Il y
[1:30:11]
a eu cinq signatures. Il y avait
[1:30:16]
1411 signatures requises pour
[1:30:19]
s'opposer aux règlements. Donc
[1:30:21]
le règlement est réputé pour
[1:30:22]
avoir été appuyé par les
[1:30:24]
personnes habiles à voter
[1:30:25]
puisqu'il n'y avait pas de
[1:30:26]
signature
[1:30:27]
(inaudible)
[1:30:28]
. C'est un dépôt. Request for a
[1:30:29]
review of the Demolition
[1:30:30]
Committee's decision of February
[1:30:31]
13, 2024, pertaining to the
[1:30:32]
building located at 524
[1:30:34]
Rockhill. This is to revise the
[1:30:42]
committee's decision taken on
[1:30:46]
February 13th 2024, and approve
[1:30:47]
the application for a
[1:30:48]
certificate of authorization to
[1:30:50]
demolish the building.
[1:30:52]
>> All in favour?
[1:30:56]
>> Who is proposing?
[1:30:57]
[Inaudible]
[1:30:58]
>> I'm seconding.
[1:31:00]
>> All in favour? All against?
[1:31:07]
>> Motion carried.
[1:31:08]
>> So, it's carried, yeah.
[1:31:09]
[Inaudible]
[1:31:12]
>> Yes.
[1:31:13]
>> Oh, dear. I can't --
[1:31:16]
>> Listen, this is not the time
[1:31:18]
to interview.
[1:31:19]
[Inaudible]
[1:31:22]
>>
[1:31:23]
- No. Non.
[1:31:26]
>> I will be visiting my family
[1:31:27]
[Inaudible]
[1:31:31]
- Demande d'approbation d'un
[1:31:32]
deuxième projet particulier de
[1:31:33]
construction, de modification ou
[1:31:34]
d'occupation d'un immeuble
[1:31:35]
(PPCMOI)
[1:31:36]
situé au 275, Elm, Beaconsfield,
[1:31:38]
avec changements,
[1:31:43]
(lots projetés 6 555 296 et 6
[1:31:44]
555 297 du cadastre du Québec)
[1:31:45]
dans la zone C330 du Règlement
[1:31:47]
de zonage 720
[1:31:48]
(Projet PP-12-1)
[1:31:50]
. La recommandation du CCU est
[1:31:56]
approuvé, ce serait selon les
[1:31:58]
plans d'architecture daté du 28
[1:31:59]
novembre 2023.
[1:32:00]
>>
[1:32:02]
- Okay -- O.K.. Alors, en
[1:32:04]
faveur? Propose, all proposed
[1:32:08]
law.
[1:32:11]
- Je propose.
[1:32:15]
- Qui seconde?
[1:32:16]
- J'appuie.
[1:32:17]
- En faveur?
[1:32:21]
- Contre? Trois. Alors moi, je
[1:32:27]
vais voter... comme c'est mon
[1:32:29]
vote, je vais voter pour. And I
[1:32:33]
want to read a statement that I
[1:32:36]
prepared to explain my vote. I
[1:32:38]
would like to specify that
[1:32:42]
tonight we are approving these
[1:32:43]
specific construction
[1:32:45]
authorization or occupancy
[1:32:47]
proposal for an immovable,
[1:32:49]
commonly referred to as PPCMOI,
[1:32:54]
for 275 Elm plaza, as
[1:32:56]
recommended to Council by the
[1:32:59]
Planning Advisory Committee.
[1:33:01]
This is not about the
[1:33:03]
architectural design of the
[1:33:04]
project. As a next step, the
[1:33:07]
planning advisory committee will
[1:33:08]
have to analyze the project
[1:33:10]
under the site planning an
[1:33:13]
architectural integration
[1:33:14]
program, commonly referred to as
[1:33:18]
the PIA, and make a
[1:33:20]
recommendation to Council. I
[1:33:22]
think it is important to explain
[1:33:23]
why I had to intervene with my
[1:33:27]
vote on the Council split,
[1:33:29]
something I rarely do, because I
[1:33:31]
prefer our policies and actions
[1:33:32]
to be adopted unanimously or at
[1:33:35]
the very least by consensus.
[1:33:39]
Density projects are often
[1:33:40]
opposed by immediate neighbours
[1:33:43]
but supported by the general
[1:33:45]
population. This is the
[1:33:46]
experience of most cities where
[1:33:49]
densification is taking place.
[1:33:54]
Conscient de cette sensibilité
[1:33:56]
du voisinage du projet du 275
[1:33:59]
Elm, le conseil a bien pris soin
[1:34:02]
de consulter la population pour
[1:34:03]
écouter attentivement leurs
[1:34:04]
observations...
[1:34:06]
(---)
[1:34:08]
et leurs préoccupations
[1:34:10]
concernant ce projet. C'est
[1:34:11]
pourquoi, à la suite de la
[1:34:12]
consultation publique, nous
[1:34:16]
avons commandé une étude des
[1:34:17]
populations qui sera rendu
[1:34:18]
public sous peu. Nous avons
[1:34:22]
aussi ajouté des conditions aux
[1:34:23]
développeurs. Nous avons
[1:34:27]
restreint les délais pour éviter
[1:34:29]
les inconvénients de la phase de
[1:34:31]
construction et nous avons en
[1:34:32]
plus imposer la création d'un
[1:34:33]
comité de bon voisinage. Cela
[1:34:37]
dit, il y a plusieurs raisons
[1:34:39]
pour lesquelles il est
[1:34:40]
préférable est avisé d'aller de
[1:34:41]
l'avant avec ce projet. This
[1:34:45]
area is in dire need of
[1:34:48]
revitalization. The fact that
[1:34:50]
this site has been used strictly
[1:34:52]
for commercial purposes for
[1:34:54]
decades has shown that it is not
[1:34:57]
viable. Most of the businesses
[1:35:00]
have left in recent years. As a
[1:35:02]
result, the area is not very
[1:35:08]
appealing in a purely commercial
[1:35:11]
sense. We developing the site as
[1:35:13]
a residential area will make it
[1:35:17]
more attractive and improve both
[1:35:18]
the landscape and the urban
[1:35:21]
fabric. It will also maintain
[1:35:24]
the limited range of destination
[1:35:27]
shops. I understand that
[1:35:31]
residents in the immediate
[1:35:33]
vicinity are opposed to this
[1:35:34]
project, believing that blocking
[1:35:36]
it will result in a site being
[1:35:39]
developed and a more limited way
[1:35:40]
in the future. However, the
[1:35:45]
office it is likely to happen
[1:35:48]
and in the short term because of
[1:35:51]
the current revision of the
[1:35:57]
PMAD, which stands for Plan --
[1:35:59]
métropolitain de développement
[1:36:01]
the framework imposed by the
[1:36:03]
Québec government for land
[1:36:05]
development. As far as the
[1:36:07]
metropolitan region is
[1:36:08]
concerned, we already know that
[1:36:10]
it will impose densification of
[1:36:14]
the territory, particularly in
[1:36:17]
major transport routes, such as
[1:36:19]
we had on elm with the the two
[1:36:24]
train stations.. Le grand
[1:36:29]
terrain du 275 Elm, longe la
[1:36:31]
voie ferrée et se trouve à peu
[1:36:32]
près à mi-chemin entre deux
[1:36:34]
stations du train de banlieue
[1:36:36]
exo qui dessert le centre-ville.
[1:36:38]
Il y a un nouveau paiement sans
[1:36:40]
doute adapté d'ici 1 an et c'est
[1:36:46]
le 275... 275 Elm, il sera
[1:36:48]
classifié pour une densification
[1:36:49]
encore plus imposante. On pourra
[1:36:51]
penser qu'un bâtiment de deux à
[1:36:52]
quatre étages comme c'est le cas
[1:36:55]
ici sera insuffisant en vertu de
[1:36:57]
ces nouvelles règles. Il faut
[1:37:00]
comprendre que ces nouvelles
[1:37:01]
règles sont motivés par un
[1:37:03]
esprit de développement durable.
[1:37:06]
On vise à promouvoir le
[1:37:08]
transport actif et collectif et
[1:37:09]
à augmenter l'offre d'habitation
[1:37:12]
plus abordable tout en réduisant
[1:37:13]
le coût des infrastructures
[1:37:16]
publiques par la densification
[1:37:17]
du territoire. Another factor to
[1:37:19]
consider is that new housing --
[1:37:23]
is the new housing the project
[1:37:25]
will provide. Many Beaconsfield
[1:37:27]
residents, particularly seniors,
[1:37:29]
want to reduce their obligations
[1:37:31]
and the upkeep of their home and
[1:37:33]
grounds. It is very difficult
[1:37:35]
for them to find appropriate
[1:37:37]
housing that will allow them to
[1:37:38]
stay in Beaconsfield. This is
[1:37:41]
also the case for younger adults
[1:37:43]
who want to stay in or return to
[1:37:46]
Beaconsfield but who cannot
[1:37:47]
afford to buy a single family
[1:37:49]
home or do not want a house
[1:37:51]
woodland to maintain. Of the
[1:37:54]
6600 homes in Beaconsfield,
[1:37:56]
there are about 250
[1:37:59]
condominiums. This represents
[1:38:02]
barely 4% of our housing stock.
[1:38:06]
What's more, our vacancy rate is
[1:38:08]
less than 3%. Below this
[1:38:11]
threshold, experts consider that
[1:38:14]
there is a housing shortage.
[1:38:17]
Under these circumstances, the
[1:38:20]
275 Elm Plaza project will
[1:38:22]
provide an opportunity for many
[1:38:23]
of our citizens to return or
[1:38:27]
choose to live in Beaconsfield.
[1:38:29]
Again, -- against this backdrop
[1:38:32]
I believe Council is making a
[1:38:36]
wise decision that respects the
[1:38:37]
needs of the population and is
[1:38:39]
keeping with the provision of
[1:38:43]
sustainable development. If any
[1:38:46]
other councillors wish to
[1:38:47]
express their thoughts, please
[1:38:49]
go ahead.
[1:38:54]
>> I will say a word, Mister
[1:38:55]
Mayor. You stole a lot of my
[1:38:58]
words though. I don't know what
[1:39:01]
to say. I will probably just
[1:39:02]
picked on an expanded a couple
[1:39:04]
of points you made.
[1:39:06]
- J'ai demandé tout à l'heure.
[1:39:08]
J'ai dit que je parlerais après
[1:39:09]
votre vote.
[1:39:11]
- La période de questions est
[1:39:12]
finie. Si vous voulez nous
[1:39:13]
parler, c'est après. Pas
[1:39:15]
maintenant. Je m'excuse.
[1:39:16]
- Merci.
[1:39:18]
- J'ai demandé tout à l'heure.
[1:39:19]
- O.K....
[1:39:22]
>> Maybe a reminder also on a
[1:39:23]
couple of things, as I said
[1:39:24]
before, let me just pick out,
[1:39:26]
dive into a couple of points
[1:39:27]
that he raised, at the risk of
[1:39:29]
being repetitive and so on. I
[1:39:31]
also just highlight, this all
[1:39:33]
started with the CCU in many
[1:39:36]
ways, or the Planning Advisory
[1:39:37]
Committee. And as it was
[1:39:39]
mentioned earlier it also should
[1:39:42]
be known that it's not a City
[1:39:45]
committee necessarily, it's a
[1:39:47]
residence committee. The six
[1:39:48]
members of people just like you
[1:39:49]
on that committee. And their
[1:39:53]
recommendations after months of
[1:39:54]
months of back and forth is just
[1:39:56]
recommendation. Again, just a
[1:39:57]
recommendation to the City
[1:39:58]
Council, which we all know that,
[1:40:00]
and I've looked at this for many
[1:40:02]
many months and given the amount
[1:40:04]
of work that's there, I would
[1:40:05]
also like to thank all of
[1:40:07]
Council and the CCU, who
[1:40:08]
probably listen tonight, but all
[1:40:09]
the people who came, most of you
[1:40:11]
are here tonight, who also came
[1:40:12]
to the public consultations as
[1:40:13]
well, because that was very
[1:40:15]
helpful in a lot of the changes.
[1:40:17]
And you probably see a lot of
[1:40:18]
people going through the
[1:40:19]
documents, you see a lot of the
[1:40:21]
conditions and stuff that were
[1:40:22]
added. And for the most part,
[1:40:24]
that was because of the public
[1:40:25]
consultations, the ones that
[1:40:26]
were done by the City
[1:40:28]
specifically. So I think
[1:40:32]
congratulations for that,
[1:40:33]
because it was very helpful, and
[1:40:34]
we'd listen to all of those
[1:40:35]
comments, put all that together
[1:40:37]
at the same time. And those are
[1:40:39]
important conditions around
[1:40:40]
that. And a lot of them reflect
[1:40:42]
not only about the -- itself,
[1:40:46]
which is fundamentally the
[1:40:48]
parameters of a project. We
[1:40:50]
don't know what a building is
[1:40:51]
going to look like. I know a lot
[1:40:53]
of you have talked about and
[1:40:54]
brought up issues around the
[1:40:55]
building, because a presented a
[1:40:57]
caricature of a structure. And
[1:41:00]
sometimes that's the one that
[1:41:01]
gets imprinted in your mind. But
[1:41:03]
that is not the official project
[1:41:04]
that has been submitted. But
[1:41:06]
tonight, it's clearly not about
[1:41:08]
the project. The project has a
[1:41:10]
structure, but simply has the
[1:41:12]
parameters around the form of
[1:41:13]
something that go in there. So I
[1:41:16]
am just saying that in a
[1:41:17]
different way. The other thing
[1:41:20]
is that this was also mentioned
[1:41:25]
in one of the criteria. And I
[1:41:26]
think it's an important one. I
[1:41:28]
saw a few people shrunk about
[1:41:29]
it. But I look at it a little
[1:41:34]
differently as the resident
[1:41:35]
committee during the
[1:41:36]
implementation. A lot of
[1:41:37]
comments that are brought up
[1:41:38]
tonight with the same ones
[1:41:39]
trying to consultation, pretty
[1:41:40]
much about the nuisance during a
[1:41:43]
construction period, Dustin
[1:41:45]
sound and whatnot. So a lot of
[1:41:47]
that stuff would happen no
[1:41:48]
matter what got built on that.
[1:41:50]
You are not going to see one
[1:41:53]
single family home in acres of
[1:41:54]
grass going around that.
[1:41:55]
Whatever would go there would be
[1:41:57]
a sizeable project to begin
[1:41:59]
with. So there would always be a
[1:42:02]
little bit of dust and whatnot
[1:42:03]
there. But I think we would take
[1:42:05]
in some mitigation around that
[1:42:07]
in terms of the barrier. But I
[1:42:08]
think beyond that and ongoing to
[1:42:11]
have the committee, which would
[1:42:15]
have a lot of, some of you
[1:42:16]
there, for example, and even
[1:42:18]
some of the people to be defined
[1:42:20]
ultimately. But the point of
[1:42:21]
having that committee in and of
[1:42:23]
itself with a permit or all the
[1:42:24]
people there gives a way to
[1:42:27]
either mitigate or to plan for
[1:42:29]
certain things that will be
[1:42:30]
happening. I believe that the
[1:42:33]
promoter is acting in good
[1:42:35]
faith. So if you are acting the
[1:42:37]
relationship so far, I guess
[1:42:38]
he's also frustrated, because he
[1:42:39]
doesn't have a plan to work with
[1:42:40]
either. So there could be that
[1:42:41]
element. That is just my
[1:42:43]
conjecture. But nonetheless, the
[1:42:45]
fact that that opportunity is
[1:42:47]
there to move forward on a
[1:42:49]
project I think is practical and
[1:42:52]
useful. So I think we didn't
[1:42:54]
really expand on, that but I
[1:42:55]
think it's an important one,
[1:42:57]
because it involves the
[1:42:58]
residents choice. I wanted to
[1:42:59]
bring that up. The other thing,
[1:43:00]
not to repeat anything, but I
[1:43:03]
think also I look at this and
[1:43:04]
Council looks at it and say we
[1:43:06]
look at ourselves also looking
[1:43:07]
at a broader perspective. We
[1:43:08]
touched on this a little bit
[1:43:10]
looking at the types of --
[1:43:13]
>> I don't have an answer for,
[1:43:14]
that is there something else I
[1:43:15]
could help with?
[1:43:16]
>> Well, my phone is smarter
[1:43:17]
than I am. Well, I have an
[1:43:20]
answer for that. Part of it is
[1:43:23]
also looking at housing in
[1:43:25]
general. And we are conscious of
[1:43:28]
that in Beaconsfield,
[1:43:31]
predominately unit family
[1:43:32]
structures and so on. Now we've
[1:43:34]
seen it in other areas and there
[1:43:36]
are other projects that we have
[1:43:38]
certainly been looking at in the
[1:43:39]
future, looking to diversify
[1:43:41]
what we can offer in terms of --
[1:43:43]
we sought over and over over the
[1:43:44]
years. People want have
[1:43:46]
different housing opportunities,
[1:43:49]
different housing of
[1:43:50]
combinations and so on, whether
[1:43:51]
be in an apartment, condo, town
[1:43:52]
house, what have you. So this
[1:43:54]
type of project and others
[1:43:57]
perhaps to follow really help to
[1:44:01]
diversify what we offer to the
[1:44:03]
city. And a lot of people have
[1:44:04]
been looking forward to that.
[1:44:06]
That's why people criticize
[1:44:08]
Beaconsfield sometimes, we don't
[1:44:09]
offer enough of that. So this is
[1:44:10]
one way, one project of perhaps
[1:44:12]
more to come that we can
[1:44:13]
actually do that. The other
[1:44:16]
thing, the last point as well,
[1:44:18]
which is an important one, I
[1:44:19]
look at it this way is also the
[1:44:23]
future, not only for our broader
[1:44:25]
perspective, but we need to be
[1:44:26]
mindful of what can come down.
[1:44:28]
You mentioned this, Mister
[1:44:29]
Mayor, about -- and so on. Now
[1:44:33]
what we are looking at a PPCMOI
[1:44:34]
tonight, you can imagine, in
[1:44:36]
certain areas, even without a
[1:44:37]
PPCMOI, just a zoning, people
[1:44:39]
can come in and do something
[1:44:40]
that can be much more dense and
[1:44:42]
much more dense than what we are
[1:44:44]
proposing here tonight, without
[1:44:48]
even doing a PPCMOI. So it could
[1:44:49]
just be part of a zone that
[1:44:52]
would qualify, for example. So
[1:44:54]
this does give an example to
[1:44:56]
control some of the apartments
[1:44:59]
and so on. The volume of the
[1:45:01]
overall project when it first
[1:45:02]
started, carrying down to what
[1:45:05]
it is today is actually
[1:45:06]
significantly less than what it
[1:45:07]
was originally. I know that may
[1:45:08]
not please all of you, I
[1:45:10]
understand, but it's to be noted
[1:45:11]
nonetheless. So I think overall,
[1:45:15]
we are just getting started.
[1:45:18]
With the PPCMOI, it's really
[1:45:19]
just the first step of what I
[1:45:22]
think would be the next step in
[1:45:24]
what this thing is going to look
[1:45:26]
like when we are there. I think
[1:45:28]
that's a big important step,
[1:45:30]
because a lot of your comments
[1:45:31]
have been about that type of
[1:45:32]
thing. Because it's not as
[1:45:34]
technical. It's always easier to
[1:45:35]
get your head around a picture
[1:45:36]
when you are looking at
[1:45:37]
something they are a lot of
[1:45:39]
potentially numbers on a page
[1:45:40]
and so on, which becomes very
[1:45:42]
academic in a way. So I think we
[1:45:45]
have a good opportunity in front
[1:45:47]
of us and responsibility at the
[1:45:48]
same time. So we are looking for
[1:45:50]
to that as we go for it.
[1:45:54]
>> Thank, you Councillor Newell.
[1:45:56]
Any other comments?
[1:45:57]
>> I would say -- thank, you
[1:45:59]
Mister Mayor. I'm not going to
[1:46:01]
add any more to what residents
[1:46:03]
have been saying since September
[1:46:07]
council and also at the public
[1:46:10]
consultations and tonight. I
[1:46:13]
thought that tonight we heard
[1:46:15]
some really interesting stories
[1:46:17]
that were different than what we
[1:46:19]
had heard before. It was
[1:46:22]
interesting tonight that a
[1:46:25]
president mention the new --
[1:46:26]
that's coming. That's certainly
[1:46:28]
a risk that we all take that
[1:46:30]
perhaps densification at the Elm
[1:46:32]
Plaza might be higher. But at
[1:46:33]
the same time, the key word
[1:46:36]
there was that the City will
[1:46:37]
have its own power and it will
[1:46:39]
not lose it. And I think what
[1:46:41]
most of the citizens were
[1:46:43]
concerned about where things
[1:46:44]
like the setbacks, you know
[1:46:47]
other infringements that are
[1:46:49]
taking place. So I hope that is
[1:46:53]
something that the City, Mister
[1:46:56]
Mayor, may take into
[1:46:57]
consideration and some of the
[1:46:59]
other -- if it's possible
[1:47:01]
tonight. But at the same time,
[1:47:06]
let's not who that with the
[1:47:08]
future demand they would allow a
[1:47:10]
five year construction period
[1:47:12]
and also bring another
[1:47:13]
guarantees in protections for
[1:47:14]
the public's and residents and
[1:47:16]
also to the daycare nursery.
[1:47:18]
>> Yeah, I just want to rectify
[1:47:21]
one thing. The density of a
[1:47:24]
particular area such as that one
[1:47:27]
on elm would be imposed on us,
[1:47:30]
will not be in our power to
[1:47:32]
determine the density. It will
[1:47:35]
be imposed by the government.
[1:47:37]
>> I did say also, I'm hoping
[1:47:38]
that some of the -- if there's
[1:47:40]
any initial preconditions that
[1:47:42]
can be made to the project now
[1:47:44]
that it's moving ahead, and I
[1:47:48]
believe that for the urban
[1:47:50]
planning in the City to work
[1:47:52]
about, be added as well for --
[1:47:55]
as soon as possible, given the
[1:47:57]
vote tonight. Encourage you to
[1:48:00]
do it.
[1:48:01]
>> Any other comments? Okay, we
[1:48:05]
will move on. Request for
[1:48:09]
approval of a first draft for a
[1:48:12]
specific construction project,
[1:48:13]
alteration or occupancy
[1:48:16]
proposals for an immovable
[1:48:17]
(SCAOPI)
[1:48:18]
located at 550 Beaconsfield,
[1:48:25]
Beaconsfield
[1:48:26]
(lots 1 416 861 and 1 416 862
[1:48:27]
of the Cadastre of Québec)
[1:48:28]
in zone C102 of Zoning By-law
[1:48:29]
720
[1:48:30]
(Project PP-13-1)
[1:48:32]
. The recommendation of the CC
[1:48:38]
is to refuse.
[1:48:39]
>> I propose.
[1:48:40]
>> I second.
[1:48:43]
>> In favour of the
[1:48:44]
recommendation?
[1:48:49]
- À l'unamimité. Demande
[1:48:54]
d'approbation du Plan
[1:48:55]
d'implantation et d'intégration
[1:48:56]
architecturale
[1:48:57]
(PIIA)
[1:48:58]
relatif à la demande d'un permis
[1:48:59]
de construction pour un nouveau
[1:49:00]
bâtiment principal situé au 74,
[1:49:01]
Devon. La recommandation est de
[1:49:02]
refuser.
[1:49:03]
- Proposé.
[1:49:04]
- Secondé.
[1:49:05]
- En faveur pour la
[1:49:06]
recommandation.
[1:49:07]
- Request for the approval à
[1:49:08]
l'unamimité. of the Site
[1:49:09]
Planning and Architectural
[1:49:10]
Integration Programme
[1:49:11]
(SPAIP)
[1:49:12]
relating to a building permit
[1:49:13]
application for the extension of
[1:49:14]
the main building located at 88
[1:49:15]
Beaconsfield. The recommendation
[1:49:18]
is to approve as per planned the
[1:49:21]
positive on March 12th, 2024.
[1:49:24]
>> Proposed.
[1:49:25]
>> Seconded.
[1:49:27]
>> In favour of the
[1:49:28]
recommendation?
[1:49:31]
- À l'unamimité. Demande
[1:49:33]
d'approbation du Plan
[1:49:34]
d'implantation et d'intégration
[1:49:35]
architecturale
[1:49:36]
(PIIA)
[1:49:37]
relatif à la demande d'un permis
[1:49:38]
de construction pour
[1:49:39]
l'agrandissement du bâtiment
[1:49:40]
principal situé au 116, Angell.
[1:49:41]
La recommandation est de
[1:49:42]
refuser.
[1:49:44]
- Proposé.
[1:49:45]
- Secondé.
[1:49:46]
- Request for the approval en
[1:49:47]
faveur du projet de of the Site
[1:49:48]
Planning and recommandations.
[1:49:49]
- À l'unanimité. Architectural
[1:49:50]
Integration Programme
[1:49:51]
(SPAIP)
[1:49:52]
relating to a building permit
[1:49:53]
application for the extension of
[1:49:54]
the main building located at 124
[1:49:57]
Taywood. The recommendation is
[1:50:00]
to approve, as per planned
[1:50:03]
positive on March -- 2024.
[1:50:07]
>> Proposed.
[1:50:08]
>> I second.
[1:50:10]
- En faveur de la
[1:50:11]
recommandation.
[1:50:16]
Demande d'approbation du Plan
[1:50:17]
d’implantation et d’intégration
[1:50:18]
architecturale
[1:50:19]
(PIIA)
[1:50:20]
relatif à la demande d'un permis
[1:50:21]
de construction pour
[1:50:22]
l'agrandissement d'un bâtiment
[1:50:23]
principal situé au 124, Taywood
[1:50:24]
(---)
[1:50:25]
168, Chartwell, plutôt.
[1:50:28]
(---)
[1:50:29]
à l'unamimité. Request for the
[1:50:31]
approval of the Site Planning
[1:50:32]
and Architectural Integration
[1:50:33]
Programme
[1:50:34]
(SPAIP)
[1:50:35]
relating to a building permit
[1:50:36]
application for the extension of
[1:50:37]
the main building located at 285
[1:50:38]
Westcroft. The recommendation is
[1:50:43]
to refuse.
[1:50:44]
>> Proposed.
[1:50:46]
>> Second.
[1:50:47]
>> In favour.
[1:50:51]
- À l'unamimité. Demande
[1:50:52]
d'approbation du Plan
[1:50:53]
d'implantation et d’intégration
[1:50:54]
architecturale
[1:50:55]
(PIIA)
[1:50:56]
relatif à la demande d'un permis
[1:50:57]
de construction pour la
[1:50:58]
modification de la façade du
[1:50:59]
bâtiment principal situé au 180,
[1:51:00]
Sherwood. La recommandation est
[1:51:03]
d'approuver.
[1:51:05]
- Proposé.
[1:51:07]
- En faveur.
[1:51:09]
- Request for the approval of
[1:51:10]
the Site Planning and à
[1:51:11]
l'unamimité. Architectural
[1:51:12]
Integration Programme
[1:51:13]
(SPAIP)
[1:51:14]
relating to a building permit
[1:51:15]
application for the modification
[1:51:16]
of the facade of a main building
[1:51:17]
located at 224 Sherwood. The
[1:51:22]
recommendation is to approve.
[1:51:23]
>> Proposed.
[1:51:24]
>> Seconded.
[1:51:25]
>> In favour.
[1:51:28]
- À l'unamimité. Demande
[1:51:29]
d'approbation du Plan
[1:51:30]
d'implantation et d'intégration
[1:51:31]
architecturale
[1:51:32]
(PIIA)
[1:51:33]
relatif à la demande d'un permis
[1:51:35]
de construction pour la
[1:51:36]
modification de la façade du
[1:51:37]
bâtiment principal situé au 361,
[1:51:38]
Robin. La recommandation est de
[1:51:41]
refuser. Cependant, le Conseil
[1:51:43]
accepte la proposition de
[1:51:44]
vinyle.
[1:51:46]
- Proposé.
[1:51:50]
- En faveur d'accepter la
[1:51:53]
recommandation telle que décrite
[1:51:56]
par... accepting -- yeah. Okay,
[1:52:04]
good.
[1:52:06]
- À l'unamimité. Request for the
[1:52:08]
approval of the Site Planning
[1:52:09]
and Architectural Integration
[1:52:10]
Programme
[1:52:11]
(SPAIP)
[1:52:12]
relating to a building permit
[1:52:13]
application to modify the
[1:52:14]
already approved plan at 30
[1:52:15]
Madsen. The recommendation is to
[1:52:19]
refuse.
[1:52:20]
>> Proposed. Seconded.
[1:52:23]
- En faveur.
[1:52:26]
- À l'unamimité. Demande de
[1:52:28]
certificat d'autorisation pour
[1:52:29]
l'installation d'une enseigne
[1:52:30]
pour le commerce situé au 482,
[1:52:31]
Beaconsfield - Suite 203. La
[1:52:35]
recommandation est d'approuver
[1:52:37]
selon l'option du fond blanc.
[1:52:41]
- Proposé.
[1:52:42]
- Secondé.
[1:52:43]
- En faveur.
[1:52:44]
- À l'unanimité. Permanent
[1:52:46]
nomination as Chef de section,
[1:52:47]
bâtiments to position 5105.
[1:52:55]
>> Proposed.
[1:53:00]
- En faveur.
[1:53:03]
- À l'unanimité. Nomination en
[1:53:06]
vue de permanence à titre de
[1:53:07]
Contremaître, égouts et aqueducs
[1:53:08]
au poste 5204
[1:53:09]
>>. Proposed.
[1:53:12]
>> In favour. Nomination in view
[1:53:17]
of permanency as Agente,
[1:53:18]
- À l'unanimité. Paie et
[1:53:19]
avantages sociaux to position
[1:53:21]
2002.
[1:53:26]
- Je propose.
[1:53:27]
- Je seconde.
[1:53:28]
- En faveur.
[1:53:29]
- À l'unanimité. Nomination en
[1:53:30]
vue de permanence à titre
[1:53:31]
d'Inspectrice en canopée au
[1:53:32]
poste 7108.
[1:53:37]
- Je propose.
[1:53:40]
- En faveur. Suspension of an
[1:53:42]
employee
[1:53:43]
- À l'unanimité.
[1:53:45]
>> I propose.
[1:53:46]
>> Second.
[1:53:47]
>> In favour.
[1:53:51]
- À l'unanimité. Procès-verbal
[1:53:52]
de la réunion du Comité
[1:53:53]
consultatif d'urbanisme du 6
[1:53:54]
mars 2024.
[1:53:56]
- Proposé.
[1:53:58]
- Secondé.
[1:54:01]
>> Anything to say?
[1:54:04]
- Non, je n'ai pas d'autres
[1:54:06]
commentaires au-delà de ce qu'on
[1:54:07]
est passé à travers ce soir.
[1:54:11]
Renewal of the mandate of a
[1:54:12]
member of the Traffic
[1:54:14]
- À l'unanimité. Advisory
[1:54:15]
Committee
[1:54:17]
>> Mister Chairman, I propose.
[1:54:20]
We are welcoming back -- for a
[1:54:24]
second term. Ms. Lalonde is a
[1:54:27]
resident of the sweet bar area,
[1:54:29]
so we are looking forward to
[1:54:31]
continue working with her.
[1:54:34]
>>
[1:54:35]
>>
[1:54:36]
>> Second. In favour.
[1:54:38]
>> Oh, yeah, sorry, second.
[1:54:41]
- À l'unanimité. Nomination d'un
[1:54:43]
cadre de la Ville de
[1:54:44]
Beaconsfield au Comité du Fonds
[1:54:45]
de pension.
[1:54:48]
- Proposé.
[1:54:49]
- J'appuie.
[1:54:53]
- Est-ce qu'on peut mentionner
[1:54:54]
ce qui?
[1:54:56]
- Oui, il s'agit d'un autre
[1:54:58]
trésorier et directeur des
[1:55:00]
finances, Robert Lacroix, suite
[1:55:02]
au départ de l'assistant
[1:55:03]
trésorière. Donc, il va combler
[1:55:06]
ce poste-là pour quelques mois.
[1:55:07]
On verra en mi-juin s'il va
[1:55:10]
continuer là aussi on va
[1:55:11]
redonner à la remplaçante de
[1:55:12]
Dominique.
[1:55:14]
- En faveur.
[1:55:23]
- Est-ce qu'on avait proposé?
[1:55:26]
Federal infrastructure parfait.
[1:55:27]
C'est donc à l'unanimité.
[1:55:28]
Funding not keeping pace with
[1:55:29]
population growth.
[1:55:33]
>> I propose.
[1:55:34]
>> Second.
[1:55:35]
>> In favour.
[1:55:41]
- À l'unanimité. Dépôt du
[1:55:42]
rapport annuel portant sur
[1:55:43]
l'application du règlement de
[1:55:44]
gestion contractuelle BEAC-151
[1:55:45]
pour l'année 2023. Mandate given
[1:55:48]
to il s'agit d'un dépôt.
[1:55:49]
Bélanger Sauvé law firm to
[1:55:50]
represent the City of
[1:55:51]
Beaconsfield's interests
[1:55:52]
regarding the private property
[1:55:53]
located at 372 Chantilly.
[1:55:58]
>> Proposed.
[1:55:59]
>> Seconded.
[1:56:00]
>> In favour. Demande
[1:56:07]
d'autorisation pour tenir des
[1:56:08]
opérations de nuit dans le cadre
[1:56:09]
d'un tournage cinématographique
[1:56:10]
au 313, Pinetree le 2 mai 2024.
[1:56:13]
- Proposé.
[1:56:15]
- J'appuie.
[1:56:16]
- En faveur. Authorization for
[1:56:17]
street
[1:56:18]
- À l'unanimité. Closure for the
[1:56:19]
event Beau Market, on Fridays
[1:56:20]
between May 31 and September 13,
[1:56:23]
2024, from 2 p.m. to 6:30 p.m..
[1:56:32]
>> Proposed.
[1:56:33]
>> Seconded.
[1:56:34]
>> All in favour.
[1:56:36]
>> Unanimous.
[1:56:42]
- Autorisation pour Les Amis du
[1:56:43]
Village Beaurepaire d'organiser
[1:56:44]
une vente de garage
[1:56:45]
communautaire
[1:56:46]
(Big Beau)
[1:56:47]
dans le secteur du Village
[1:56:48]
Beaurepaire le 11 mai 2024 de 10
[1:56:49]
h 30 à 19 h 30 et autorisation
[1:56:50]
de fermeture de rue.
[1:56:54]
>> I propose.
[1:56:55]
>> Second.
[1:56:56]
>> In favour. Authorization to
[1:56:59]
sign
[1:57:00]
- À l'unanimité. Professional
[1:57:01]
services agreements with the
[1:57:02]
finalists of the architectural
[1:57:04]
competition as part of the
[1:57:05]
Imagine Centennial project.
[1:57:10]
>> Propose.
[1:57:11]
>> Second.
[1:57:12]
>> In favour.
[1:57:14]
- À lui d'un imité.
[1:57:15]
Municipalisation de partie de
[1:57:16]
voie ouverte à la circulation
[1:57:18]
publique depuis au moins dix ans
[1:57:19]
en vertu de l'article 72 de la
[1:57:20]
Loi sur les compétences
[1:57:23]
municipales. Il s'agit de la rue
[1:57:27]
Lakeshore dans le secteur
[1:57:28]
Thompson point.
[1:57:31]
- Proposé.
[1:57:32]
- J'appuie.
[1:57:33]
- En faveur.
[1:57:34]
- À l'unanimité. Authorization
[1:57:35]
to request a financial support
[1:57:36]
for the free training leading to
[1:57:38]
national lifeguard and aquatic
[1:57:40]
instructor for the period of
[1:57:41]
April 1, 2024, to March 31,
[1:57:45]
2025.
[1:57:48]
>> I propose.
[1:57:51]
>> Second.
[1:57:52]
>> In favour.
[1:57:55]
- À l'unanimité. Rapport du
[1:57:56]
maire sur les décisions prises
[1:57:57]
par le Conseil d'agglomération
[1:57:59]
lors de sa séance du 21 mars
[1:58:01]
2024.
[1:58:04]
- La seule chose que je voudrais
[1:58:07]
mentionner, c'est qu'à
[1:58:09]
l'agglomération, à la séance du
[1:58:11]
conseil d'agglomération, les
[1:58:12]
maires des villes reconstituée,
[1:58:16]
veulent Hillier, continue de
[1:58:20]
voter contre les items sur le
[1:58:25]
partage des dépenses entre
[1:58:27]
Montréal et les villes liées où
[1:58:29]
les villes reconstituée. Alors,
[1:58:34]
c'est un message qu'on essaie de
[1:58:35]
passer à Montréal qu'on est
[1:58:38]
réellement pas d'accord avec la
[1:58:40]
façon que les dépenses de
[1:58:43]
l'agglomération sont partagées
[1:58:45]
par Montréal et par les villes
[1:58:48]
liées. On continue, à chaque
[1:58:51]
séance agglomérations, on va
[1:58:53]
continuer à voter contre les
[1:58:55]
systèmes où il y a un partage de
[1:58:57]
dépenses entre Montréal et les
[1:58:58]
villes liées.
[1:59:04]
>> The positive or the
[1:59:05]
director's report.
[1:59:08]
- Pas du tout.
[1:59:11]
- C'est bon.
[1:59:17]
- Alors, les affaires nouvelles.
[1:59:19]
Je ne pense pas qu'il y ait des
[1:59:21]
affaires nouvelles, à ce que je
[1:59:22]
sache. Alors, est-ce que
[1:59:24]
quelqu'un va proposer et
[1:59:27]
seconder la levée de la séance?
[1:59:28]
- Je propose.
[1:59:29]
- Je seconde.
[1:59:30]
- Merci beaucoup. And I want to
[1:59:33]
thank everyone that still here
[1:59:38]
for state for the whole meeting.
[1:59:41]
It is much appreciated. Quite
[1:59:44]
often after the question period,
[1:59:47]
the room empties. And it's not
[1:59:51]
the case this time. It is much
[1:59:55]
appreciated that you showed an
[1:59:58]
interest and what goes on in
[2:00:02]
your cities and that you were
[2:00:04]
there for the whole agenda. Et
[2:00:10]
je remercie aussi les gens qui
[2:00:12]
sont sur la webdiffusion. Merci
[2:00:16]
beaucoup d'avoir été patient,
[2:00:18]
parce que c'est une réunion qui
[2:00:19]
a quand même duré 2 heures. Mais
[2:00:25]
je suggérais, la prochaine fois,
[2:00:27]
que madame Godin soit en charge
[2:00:31]
de la réunion, parce que pour
[2:00:32]
elle, ça a été 41 minutes.
[2:00:34]
Alors, 41 minutes. Elle a été
[2:00:39]
très efficace pour la réunion.
[2:00:42]
Aujourd'hui, c'est 2 heures.
[2:00:44]
Mais merci beaucoup pour les
[2:00:45]
gens sur la webdiffusion de nous
[2:00:46]
regarder. Thank you very much
[2:00:48]
for watching us and showing an
[2:00:50]
interest in your city. And we
[2:00:53]
will see you all next month. Au
[2:00:58]
mois prochain. Encore une fois,
[2:01:00]
je vous invite à venir à la
[2:01:02]
réunion du conseil du mois
[2:01:04]
d'avril. Merci.
[2:01:05]
| | |