[0:15]
Hello.
[0:16]
Thank you.
[0:16]
We are pleased to present you
[0:18]
our project for Beaconsfield's new cultural
centre.
[0:21]
I have to tell you that this project is particularly
close to my heart.
[0:24]
I'm a Beaconsfield resident myself,
[0:27]
so I can tell you that I've often enjoyed the
site, its
[0:30]
activities, its structures, its access to water
as well.
[0:35]
It is already a unique and rather exceptional
place.
[0:39]
So to add the marina site, as well as adding
[0:43]
cultural activities, make it a real opportunity
[0:46]
to make it an inspiring site that will become
even more
[0:48]
a place of discovery and entertainment for
citizens.
[0:52]
So, all along the West Island, the Lakeshore
scenic parkway
[0:56]
is punctuated by slowdown points to
[0:58]
observe the attractions, including the Pointe-Claire
village
[1:01]
and Beaurepaire village, a little to the West,
in Beaconsfield.
[1:05]
Located between these two commercial hubs,
the project becomes another of these places,
[1:09]
which, this time, comes to identify
[1:11]
and reinforce the civic core with its proximity
to City Hall
[1:14]
and the surrounding sports facilities and green
spaces.
[1:20]
So, on Beaconsfield
[1:20]
Boulevard, on the project, we can see a first
pedestrian
[1:23]
crossing opposite City Lane. Then another crossing
[1:29]
opposite Heroes' Park which leads to the centre
of the site.
[1:32]
And then to the East, the start of the civic
core is marked by the axis leading
[1:37]
to the North of Beaconsfield, with its bike
path, which is identified
[1:41]
here in red. So, with the project visible from
the street,
[1:45]
and located in the centre of the site, it becomes
a focal point
[1:48]
in a circulation loop where active transportation
is encouraged
[1:52]
and leads users to discover the trails
[1:55]
and the new centre that is centrally placed.
[1:59]
So I'll leave you to it, Annie.
[2:01]
Good evening.
[2:04]
Like this? Yes.
[2:05]
So the new cultural centre project is
[2:09]
a real catalyst for the creation of a cultural
landscape park in Beaconsfield.
[2:14]
Following the annexation of the existing park
[2:18]
to the marina site, we positioned the building
[2:23]
astride the water line that currently separates
them
[2:27]
and roughly in the centre of the park.
[2:31]
The cultural centre and the park are designed
[2:34]
in interrelationship thanks to a detailed reading
of the landscape
[2:37]
and an interpretation of the context and its
history.
[2:42]
First of all, we identified and reinforced
four landscape strips
[2:45]
that run parallel to the riverbank as far as
Beaconsfield Boulevard,
[2:51]
and which in fact reveal
[2:53]
the landscape on a territorial scale and the
natural topography of the site.
[2:58]
So these landscape waves each have
[3:01]
their own characteristics and purposes.
[3:03]
First of all, the shoreline strip.
[3:14]
...(inaudible)... Pardon.
[3:23]
These landscape strips
[3:24]
each have their own characteristics and purposes.
[3:26]
First of all, the shoreline strip which is
conducive to contemplation,
[3:31]
the grassy plain,
[3:35]
the grassy plain,
[3:36]
which is perfect for gatherings, the forest
canopy
[3:40]
that allows discoveries, and the urban filter
that welcomes citizens.
[3:45]
Human occupation
[3:48]
Human occupation and its history on the site
is marked,
[3:50]
for its part, by tracings that are perpendicular
to the street.
[3:54]
The tracings of three former
[3:56]
agricultural plots can still be seen in the
lines of trees,
[4:00]
the paths leading to the lake and the docks
entering the water.
[4:03]
A ditch that directs water away from the roadway...
[4:06]
...(inaudible)...
[4:09]
the road to the lake
[4:11]
also forms part of these tracings.
[4:14]
In this way, we have identified and strengthened
three landscape lots.
[4:18]
The historic lot on the left, which remains
virtually intact.
[4:22]
The site of the former Centennial House, if
it were to be demolished,
[4:26]
could be marked by the construction of a loose
roof
[4:29]
that would become the park's gazebo and would
provide a stage for gatherings.
[4:34]
In the centre, we have the wet lot which supports
biodiversity.
[4:39]
It is characterized by a sequence of gardens
[4:43]
that extend to the
[4:45]
vegetated riverbank and replaces the existing
ditch.
[4:49]
And finally, the community lot on the right-hand
side, to the East
[4:52]
is characterized by the developing of a large
open space
[4:56]
that descends from the boulevard to Lake Saint-Louis,
[4:59]
creating a sequence of open multipurpose spaces
[5:03]
for the community, known as the Heroes' Esplanade.
[5:07]
We also propose that
[5:09]
the new park chalet be integrated into this
lot, in the forest canopy.
[5:14]
The waves and landscaped plots weave together
a web
[5:17]
where nature, culture, landscape,
[5:20]
history and community come together.
[5:24]
On the longitudinal section
[5:26]
of the site, you can appreciate the natural
topography
[5:29]
which descends from Beaconsfield Boulevard
down to Lake Saint-Louis.
[5:34]
The centre is registered in the tree canopy.
[5:38]
We are proposing a single-level centre to encourage
[5:42]
conviviality and encounters, and also to create
a public space that will ensure
[5:48]
the fluidity of community life between the
interior spaces and the park.
[5:53]
Covered
[5:54]
by a large, welcoming, slightly sloping roof,
[5:57]
the cultural centre opens out onto the landscape.
[6:02]
The building's layout blends into the trees'
canopy.
[6:06]
It unfolds organically, skirting around the
existing trees
[6:10]
to preserve them, creating a configuration
with several branches
[6:14]
that form together semi-open courtyards and
an enclosed courtyard.
[6:19]
The branch that remains outside the forested
area to the East
[6:22]
marks the building from Beaconsfield Boulevard.
[6:26]
This location provides a volumetric shape to
the building
[6:29]
that is inviting and united with the landscape.
[6:33]
On the boulevard side, its arched shape welcomes
residents.
[6:38]
On the park side, the courtyards bring the
vegetation into the heart of the building
[6:42]
and open up views over the landscape.
[6:47]
The branch configuration also creates a welcoming
heart
[6:51]
at the centre of the building, where the new
paths
[6:54]
and the various public spaces in the park converge.
[6:58]
A real network of walkways linking the boulevard,
[7:02]
the cultural centre, the park and the lake,
all created for the community.
[7:10]
The topography, which slopes down towards the
lake,
[7:12]
creates a height difference between the main
entrance,
[7:15]
on the boulevard side, and the courtyards facing
south.
[7:19]
We even see the wooden platform courtyards
with steps
[7:22]
integrated into the topography that link the
interior level and that of the site,
[7:26]
which is also being reworked to soften the
transition.
[7:30]
These courtyards are extensions of the cultural
centre to the outside world,
[7:34]
but they are also welcoming for all park users.
[7:39]
This view from the riverside promenade shows
how
[7:42]
the cultural centre opens generously
[7:45]
on the landscape with its inviting curves
[7:48]
which are partially covered by the overhangs
of the large roof.
[7:52]
In the foreground, you can also see the play
area,
[7:55]
which has been relocated close to the building.
[8:00]
For the
[8:00]
landscaping and immediate surroundings of the
building,
[8:05]
they incorporate different areas of nature
and uses of greenery.
[8:10]
On the main entrance side, in the urban filter,
[8:13]
a large forecourt has been laid out at the
entrance to the esplanade.
[8:18]
It is paved with light-coloured cobblestones
and includes planting islands.
[8:23]
It welcomes people arriving either by bike
[8:26]
or on foot from the boulevard or from the car
parking,
[8:30]
and who are heading for the cultural centre
or the park.
[8:34]
The forecourt can also be a gathering space
[8:37]
where various community events can be held.
[8:40]
It can become a market, for example:
[8:41]
public market, book market, outdoor expositions,
[8:44]
and other events can happen here too.
[8:49]
A green car parking has been created in continuity
with the forecourt.
[8:53]
Its access and exit are separate from the access
[8:57]
and exit for vehicles going down to the marina.
[9:03]
In the
[9:03]
trees' canopy, so just on the left of forecourt,
[9:06]
on the image, the rain garden sequence
[9:09]
begins to descend towards the riverbank, skirting
the building.
[9:13]
Then, on the park side, perennial gardens adorn
the courtyards
[9:18]
and the interior spaces, including the library's
reading areas.
[9:21]
These gardens create a welcoming area between
the park and the cultural centre.
[9:27]
In continuity with the branch,
[9:28]
which asserts itself in the esplanade to the
right, in the open space,
[9:32]
another gathering space is defined to the South.
[9:38]
So, in this view, from Beaconsfield Boulevard,
[9:40]
we can see the foreground's landscaping at
the forefront
[9:44]
with its planted islands and integrated benches,
and we can also see
[9:48]
the extension of the esplanade down to the
water.
[9:53]
The new cultural centre, with its arched layout
[9:57]
and its wood cladding is warm and welcoming.
[10:01]
Its scale is both civic,
[10:03]
by extending into the landscape, and friendly,
[10:06]
with its template that is appropriate to the
surrounding context.
[10:10]
Also visible in this image, in the corner of
the building,
[10:14]
is the art studio that reveals some of the
centre's activities.
[10:19]
The main entrance is marked
[10:21]
by a wide overhang on the large roof.
[10:25]
As we approach, we can see Lake Saint-Louis.
[10:28]
and adjacent to the entrance,
[10:32]
a large display case showing the artistic work
created at the centre.
[10:37]
In terms of program organization, the branch
configuration
[10:41]
provides a natural separation between the program
zones.
[10:47]
The colour diagram on the left shows how they
are organized.
[10:51]
In yellow is the reception area, which brings
[10:54]
together all the programmatic zones. It opens
onto
[10:59]
the terrace of the bistro, which can be seen
in the actionometry drawing on the right.
[11:04]
In red,
[11:05]
we have the animation branch which is installed
in the branch, therefore outside the forested
area.
[11:11]
In green, the library, which is housed in two
other branches
[11:15]
and organized over three courtyards. And in
orange, the administrative sector
[11:21]
which is in the branch that closes over the
courtyard.
[11:24]
The cultural centre is accessible to all, from
both
[11:28]
Boulevard Beaconsfield and the park. Inside
the centre,
[11:32]
the central hall provides easy access
[11:36]
and quickly to all programmatic zones.
[11:40]
The main entrance opens onto the hall.
[11:43]
It's a welcoming, open and versatile space.
[11:47]
On the plan, we can see the light grey areas
that identify the circulation routes
[11:51]
from the hall, which are fluid throughout the
building.
[11:55]
The service counter is positioned close to
the entrance.
[11:58]
It is welcoming to the public and allows the
staff to
[12:01]
have an overview of all the centre's activities.
[12:05]
In the animation branch,
[12:07]
the branch on the right, are grouped together
near the entrance to the meeting rooms,
[12:12]
the art studio and the computer laboratory.
[12:16]
The multipurpose hall is positioned at the
other end of this branch,
[12:20]
so that when it is not in black box mode, it
opens onto
[12:25]
the esplanade and offers a view of Lake Saint-Louis.
[12:30]
The bistro is adjacent to the multipurpose
hall.
[12:33]
and is a continuation of the hall with its
magazine corner and terrace.
[12:38]
A movable partition and an entrance from the
terrace
[12:42]
allow the bistro to be open outside opening
hours
[12:45]
of the centre.
[12:47]
The library's new releases displays are visible
[12:50]
and accessible from the hall, encouraging people
to enter.
[12:56]
First of all, we discover the pre-school section
[12:59]
which benefits from the natural light of the
interior courtyard and of
[13:03]
a secure outdoor play area.
[13:08]
The adjacent youth
[13:09]
section is located in the central branch.
[13:13]
It opens onto the activity room, which is located
a little lower down
[13:18]
thanks to the difference in ground levels,
allowing the creation of tiered seating.
[13:24]
These two areas can also be separated by a
movable partition.
[13:28]
A controlled access to the outside, near the
youth section
[13:32]
which is visible from the reception desk, allows
children to
[13:36]
to join the nearby playground.
[13:40]
The adult and
[13:41]
young adult sections occupy the West branch.
[13:45]
Their reading areas share a private outdoor
terrace.
[13:50]
Their study rooms
[13:51]
are housed in a space that also includes a
breastfeeding area
[13:56]
and family washrooms serving the adjacent pre-school
area.
[14:01]
The library can also be closed off outside
[14:03]
opening hours thanks to a partition separating
it from the hall.
[14:08]
And finally, the administrative sector;
[14:11]
it extends around the inner courtyard and creates
a loop
[14:15]
with the library.
[14:19]
In this view, from the hall,
[14:21]
we can appreciate the natural light
[14:25]
which is filtered through the tree canopy and
bathes the interior space.
[14:29]
You can also see the views towards the landscape.
[14:33]
It is also apparent the fluidity of the interior
space
[14:37]
which is naturally subdivided by courtyards.
[14:41]
On the left is the terrace of the bistro
[14:43]
which is adjacent to the youth section, and
further,
[14:47]
the adult and young adult section.
[14:51]
Skylights punctuate the circulation
[14:53]
throughout the different areas of the library.
[14:57]
The ceilings and soffits of the eaves
[15:00]
are both clad in wood paneling to ensure
[15:03]
the continuity,
[15:04]
especially the visual continuity, between the
interior and exterior spaces.
[15:09]
We can also see the structure's slender, round
columns
[15:12]
that accentuate the desired fluidity of the
spaces.
[15:17]
So we can already mention that we opted for
a steel structure,
[15:21]
which allows for greater ranges than a wooden
structure.
[15:23]
Therefore, a greater versatility of space and
a flexibility
[15:27]
that is actually even more sustainable.
[15:29]
This cross-section shows
[15:33]
the large sloping roof which forms protective
soffits
[15:36]
on the entrance side and provides protection
from the sun on the south side.
[15:43]
On the right is the hall, and on the left is
the youth section
[15:46]
and the activity room in continuity, which
is
[15:49]
lower down with its bleachers.
[15:52]
And we see here a view of the two spaces.
[15:57]
It should also be noted that coloured flexible
floor coverings identify
[16:01]
the different areas of the library and that
the acoustic quality
[16:05]
of the spaces is ensured by the treatment of
the ceilings.
[16:08]
I'm going to hand over to Philippe, who is
going to talk about the integration
[16:11]
of technical aspects and sustainable development
strategies.
[16:17]
So I continue. Here, on the elevation.
[16:19]
So you can see the ...(inaudible)... sloping
from
[16:21]
the roof which exposes the green roof.
[16:24]
On the facades, we notice the wood cladding,
[16:26]
which adds a warm, integrated feel to the park,
[16:29]
as well as being a local and renewable material.
[16:32]
The openings are more focused on the North
side,
[16:35]
and then open up more on the south side, towards
the park.
[16:40]
So, the technical cut
[16:41]
exposes that it is made up of fairly straightforward
components
[16:45]
that make it easy to integrate systems.
[16:48]
It also illustrates well the continuity between
inside and outside.
[16:53]
It can be seen that the natural level of the
site
[16:55]
has been slightly altered,
[16:58]
which allows to be adapted to the interior,
facing the terraces and the platforms.
[17:03]
The radius of the trees of 4.5 metres and over
is therefore retained.
[17:07]
So we are further improving the condition around
the trees
[17:11]
by making a straight excavation with foundation
walls ...(inaudible)... that are insulated
[17:16]
to give the roots more room too.
[17:19]
The view from the terrace shows the bistro
terrace with its courtyard
[17:24]
which is a covered area
[17:25]
also becomes the entrance accessible from the
park side.
[17:29]
We can appreciate the openness, the protected
areas,
[17:32]
the connection with nature, all to create inspiring
and
[17:35]
inviting spaces.
[17:37]
In terms of the structure,
[17:38]
it is essentially a large inclined plane that
accommodates
[17:42]
the different heights in terms of programmatic
needs.
[17:46]
On one side, with the hall, with the administration,
at a more modest height,
[17:50]
and a sunken roof to create a large drainage
basin.
[17:54]
And one the other side,
[17:55]
the roof is raised to accommodate the multipurpose
room
[17:59]
but also to accommodate a mezzanine mechanical
[18:02]
room above the technical areas.
[18:06]
So, in this mechanical room, we find the ventilation,
which includes
[18:10]
heat recovery systems
[18:11]
via a thermal wheel with a ground-coupled heat
exchanger.
[18:15]
The ventilation is connected to fan coil units
[18:18]
that use aerothermal energy for flexibility
of use
[18:20]
to adapt to different locations.
[18:23]
And, especially, the fan coil units are installed
in the ceiling space
[18:26]
enclosed spaces,
[18:28]
to allow for a greater architectural flexibility
and
[18:30]
promote acoustics.
[18:35]
Then, in terms of sustainable development,
[18:37]
therefore, we are focusing on energy efficiency
[18:39]
as I've just described, but also on performance
[18:42]
of the tightly sealed envelope and a well-insulated
envelope,
[18:47]
as well as a triple glazing on the north side
and double glazing on the south side.
[18:51]
We are also focusing on several passive strategies,
including solar control.
[18:55]
So, with the natural canopy of trees, with
full daylight curtains, vertical
[18:58]
sunshades, roof overhangs,
[19:00]
and even the geometry creates shadows and also
allows
[19:04]
the natural ventilation of each individual
branch.
[19:07]
The focus is also on water management strategies
[19:10]
with ditch detour facing the rain gardens
[19:14]
which permits water filtration before it is
discharged
[19:17]
into Lake Saint-Louis to improve water quality.
[19:20]
There are vegetated ...(inaudible)... and then
a bioretention basin for the parking lot
[19:25]
and also a green roof to reduce heat islands,
[19:29]
to absorb water
[19:30]
and for the irrigation of the building.
[19:33]
So the aim is to design biofilms that
[19:36]
enhances biodiversity while integrating the
City's cultural ecosystem.
[19:42]
So, the
[19:42]
building itself is a catalyst for the park's
development,
[19:46]
allowing the discovery of the site through
new routes
[19:49]
where are introduced new opportunities for
use.
[19:52]
These include, notably, sculpture gardens,
relaxation areas
[19:56]
and edible gardens, but also more active areas
[19:59]
with play areas, walking and cross-country
ski trails.
[20:02]
And then, finally, the front forecourt becomes
a public gathering place.
[20:07]
Contrasting with the space in front,
[20:10]
the space behind becomes
[20:13]
so contrasted to ensure that the cultural centre
[20:16]
becomes, in a way, the keystone of the park
[20:19]
which, on one hand, welcomes citizens to cultural
spaces,
[20:23]
and, on the other, shows its great openness
to nature for all. Thank you.
[20:42]
OK, I'll start with a question
[20:46]
which is not architectural, but a question
of estimation.
[20:52]
We turn to electromechanics.
[20:55]
So, in the estimates, item D-20, which is estimated
at 108,000,
[21:00]
seems very low to include the scope of the
work
[21:03]
plumbing appliances, domestic networks and
domestic water,
[21:07]
sanitary drainage networks, rainwater drainage
networks.
[21:10]
Therefore, we would ask you to please clarify
the nature of this network,
[21:13]
according to the proposal, in order to justify
the amounts submitted. In item 30-50,
[21:19]
you have an estimate of 477,000, which also
seems
[21:23]
very low for the item that includes heat pumps.
[21:26]
So, refrigeration, boiler, heating, recovery
system,
[21:30]
as we've just seen in your drawings.
[21:32]
Here again, you need to clarify your choice
of systems
[21:35]
as well as the heating capacities in order
to justify the amounts submitted.
[21:40]
Post 50-10, I'm sorry, it's not very...
[21:43]
This is not very interesting
[21:45]
but we will discuss more interesting things
afterwards. The estimate of 219,000,
[21:49]
which also seems very low for the scope of
the work
[21:51]
which includes underground connections for
the supply transformer,
[21:56]
we ask you again to justify the amounts.
[21:59]
And, finally, the 50-30 position,
[22:01]
which has an estimate of just 69,000 for the
scope of the work,
[22:05]
which includes intercom, wifi, general call
systems, etc., etc.
[22:11]
So, to justify these amounts which seem low
[22:14]
and perhaps tell us how you plan to create
the ground-coupled heat exchanger
[22:17]
while the level of the bedrock is in fact very
high on the site.
[22:22]
In fact, I will begin, and then... So, indeed,
[22:26]
we recognize that there are discrepancies with
the presentation.
[22:29]
First,
[22:30]
when we assessed the costs, there was not the
same breakdown
[22:33]
and we had a slightly different breakdown
[22:36]
compared with this one. So our gaps were not
[22:38]
as substantial as what we saw in the report,
[22:41]
but we continued the analysis with this to
see that, indeed,
[22:46]
there are certain gaps and there are certain
amounts
[22:48]
that we recognize will have to be enhanced
[22:51]
before getting into the technical details.
[22:52]
So I'm just going to say that, in fact, we
took a good look at the estimate in
[22:57]
an integrated and global manner and we have
margins within
[23:01]
other places where we can accommodate
[23:05]
budget adjustments, where necessary, to electromechanical
systems.
[23:10]
So, we've also made provision for the systems
[23:13]
as required by the program, tried-and-tested
and fairly simple systems,
[23:16]
which allows for a budgetary rationality that
works.
[23:20]
So, maybe, I can let you mention some points
in the most
[23:24]
technical aspects, including the ground-couple
heat exchanger and others...
[23:29]
In terms of the capacity of the VRF
[23:33]
systems, we calculated approximately 25 tonnes
of air conditioning
[23:38]
which will be made with condensers, several
condensers and several
[23:41]
systems, evaporators that will be decentralized
in the building.
[23:46]
The ground-couple heat exchanger isn't very
hollow, it just has to be under the ground.
[23:52]
to benefit from the cold of the ground, in
fact,
[23:55]
to take advantage of
[23:59]
free air conditioning.
[24:04]
And if I
[24:04]
can maybe complete, since it's about the budgets.
[24:07]
We took a good look
[24:09]
at the budgetary envelope and we're very comfortable
with it,
[24:11]
precisely with budget items where we know that
[24:13]
there were certain places where we had certain
provisions
[24:16]
for the envelope, which were quite
[24:18]
generous, where we have room to adapt.
[24:23]
I do not know if you would want
[24:24]
precisions, because... there are certain areas...
[24:28]
Curtain walls, for example, which are almost,
but not quite, double the price.
[24:35]
We overestimated them. So why?
[24:37]
Because curtains really are a big difference.
[24:40]
There's also the exterior layout,
[24:43]
we leave the minimum zone that was requested.
[24:47]
So we're getting out of the budget. What was
mentioned
[24:52]
already in the presentation,
[24:56]
the presentation of the project, is the landscaping,
[24:59]
there is a budget allocated, but, depending
on the project chosen,
[25:04]
there will be
[25:06]
possibility of seeing how it can be increased,
[25:08]
but there are ways of avoiding all these elements.
[25:12]
So there's money to be taken from there too.
[25:14]
Well, actually, balanced, because we realized
that our architecture budget
[25:18]
was lower than the budget...
[25:22]
almost a million, I think. Yes.
[25:25]
So it's at site level. So some of the costs
are lower.
[25:28]
There are a lot of things
[25:29]
that have been done more on the site, which
will also have to be calibrated.
[25:33]
In the end,
[25:35]
probable deviation ...(inaudible)...
[25:40]
We understand that you are confident that you
will be able to do ...(inaudible)...
[25:44]
That's because there's a budget.
[25:46]
We have noted that your envelope and superstructure
are indeed
[25:50]
higher
[25:50]
but on the other hand, it's justified by the
fact that you have curtain-
[25:53]
walls. No need to sacrifice curtain walls
[25:56]
with segments all the same.
[26:00]
No, that, that's not part of it.
[26:02]
In fact, during the development of the project,
we explored the idea of
[26:05]
triple glass throughout and wooden curtain
walls.
[26:09]
We have reduced some of these elements
[26:11]
which were not kept,
[26:12]
but the amounts have remained fairly high in
curtain walls, for example.
[26:15]
There really is a lot of money in curtain walls.
[26:26]
I will have two questions
[26:27]
that are going to be about the captaincy,
[26:30]
the marina and their functions.
[26:33]
Can we have the site
[26:35]
plan, please?
[26:39]
Yes. Perfect, thank you.
[26:40]
I note that you have placed
[26:41]
the captaincy on the eastern side of the project,
[26:46]
with pedestrian access,
[26:50]
with the Esplanade of Heroes and, above all,
the vehicle handling area.
[26:56]
I'd like you to explain...
[26:59]
I'd like you to explain the justification for
a road on the east side,
[27:04]
considering there is a great deal of cross-fertilization
between activities
[27:09]
in what could be called the Esplanade of Heroes
[27:11]
and the handling area.
[27:16]
What we have
[27:16]
positionned is the park chalet. I do not know
if the park chalet and
[27:19]
and the captaincy are the same because... OK,
it is the same thing.
[27:23]
Because there was also kayak renting with
[27:26]
perhaps a smaller shelter on the side that
could be to the West,
[27:31]
but for the moment,
[27:35]
it's part of the mandate to be developed
[27:37]
because it really is an overall plan.
[27:39]
We've positioned it here, but it could move
to the other side.
[27:45]
The yellow passage is also visible. The yellow
passage,
[27:49]
actually, which is almost a pedestrian crossing
of a narrower area. So you can see
[27:53]
that many of the activities will be located
further south, towards the water.
[27:58]
On the other hand, the link with the new cultural
centre would be much more...
[28:04]
much more
[28:04]
spaced out and activities would take place
more to the South.
[28:08]
So there really is a central axis
[28:10]
through the park, through the axis here.
[28:21]
Thank you for your presentation.
[28:23]
I understand that, well actually, you've said
that you're going to preserve the trees
[28:30]
around and near the building, including the
terraces
[28:35]
and in the inner courtyard.
[28:36]
I would like to know if you have considered
that
[28:41]
there is a possibility that the groundwater
table will be changed
[28:45]
following the construction of the building,
which would have an impact on
[28:50]
the ...(inaudible)... necessary to preserve
the trees.
[28:56]
So, actually,
[28:58]
the site is mainly already
[29:01]
covered in grass, so it's already very, very
used
[29:05]
to absorbing a lot of water.
[29:08]
So I don't think the intervention will have
a significant impact,
[29:12]
then perhaps I'll let my colleagues in civic
and landscape complete.
[29:21]
Hello.
[29:23]
As far as the building is concerned, quite
simply the building,
[29:26]
it is...
[29:27]
a slab on grade that follows the profile of
the lower natural ground.
[29:31]
So it's not something we're worried about on
our side. As
[29:36]
Philippe said, of course, most of the site
is grassed. So
[29:39]
the water seeps through, but the groundwater
table remains high. We're close to the lake
too,
[29:43]
so, I think the trees are mature and they're
big precisely because of
[29:47]
the proximity of water to the building
[29:51]
and in the park.
[29:51]
Therefore, it is not a question
[29:55]
that is very problematic for us.
[29:59]
This will have no real impact on the groundwater
table.
[30:01]
In terms of trees, the two elements that have
an impact on the park are
[30:04]
if we were to clear around the trees or bury
them.
[30:08]
And
[30:08]
this is why we're doing a lot of work on the
perimeter of the building,
[30:11]
to have terraces that are above ground level.
[30:14]
And we try to preserve more of the natural
soil
[30:17]
to avoid impact on the trees and preserve them.
[30:19]
There are also many trees that are already...
Adjacent to these trees,
[30:25]
there are asphalted areas that are already
impermeable.
[30:28]
So the roots are not necessarily...
[30:32]
don't necessarily go that way either.
[30:33]
So there's a kind of impermeability that already
exists,
[30:38]
because they're parking lots. We really set
up where there are
[30:41]
asphalt parking lots.
[30:53]
Thank you. Thank you for the start of this
presentation.
[30:55]
I really like the fact that you're thinking
about passive solar
[30:59]
power. So I understand that the soffits are
going to be bigger,
[31:03]
are going to make use of the fact that you
are going to put several linear feet of
[31:10]
soffits,
[31:11]
during the summer, to protect you from the
sun.
[31:15]
Then, in winter, the sun is lower, so the sun
will come in more quickly.
[31:18]
And it sounds well thought out.
[31:24]
...(inaudible)...
[31:25]
The use of the spaces, where you have
[31:27]
transparency from inside the building to the
outside,
[31:32]
the orientation seems right, the use of the
building to give
[31:35]
full view of the lake and lakeside green spaces,
[31:39]
are well organized.
[31:44]
I have a question, however, about the enclosed
[31:46]
space inside. There are mature trees inside
that.
[31:49]
It's a great idea to keep this place and then
create a protected area for...
[31:56]
I think you said it was a play area for 2-5-year-olds?
0-5 year olds?
[31:59]
However, in terms of operations,
[32:02]
in terms of maintenance, how do we manage this?
[32:07]
A play area requires a lot of infrastructure,
to start.
[32:09]
So, sand, wood shavings, etc.
[32:12]
Maintenance of the structure itself, the lawn,
the plants, etc.
[32:16]
And we can see that it's really fitted out
inside
[32:21]
with the shelving
[32:23]
units and the meeting spaces and the sanitary
blocks, etc.
[32:30]
So, there may be an operational purpose that
is not
[32:33]
logical for me.
[32:37]
As far as maintenance is concerned,
[32:42]
it could... Actually.
[32:49]
Here, here is...
[32:51]
There is this space that is not in the public
areas,
[32:55]
It's a traffic area that's quite wide, it measures
about two metres.
[32:58]
There could also be double doors.
[33:00]
We've definitely got some doors here at the
moment. A door there,
[33:03]
but all this can be opened up.
[33:04]
So, here, there's a way of getting around and
entering with
[33:10]
There's nothing to move as such.
[33:12]
In terms of...
[33:14]
If there was any pruning to be done or anything
to do with the trees,
[33:16]
It would not be difficult.
[33:17]
There's a lot of climbing to be done, or perhaps
with a crane
[33:21]
to fetch dead wood, but in any case. It's...
For me,
[33:24]
it's a big question, maybe with a question
mark there.
[33:28]
It should also be noted that this is the lowest
part of the building.
[33:31]
As Philippe mentioned, the roof comes down.
[33:34]
In fact, its lowest point is really here, and
then it rises
[33:38]
like this, rises like this.
[33:41]
So that's the lowest point.
[33:42]
So the height of
[33:46]
the branches are really above the courtyard.
[33:50]
It could even be done from the roof.
[33:55]
I believe.
[33:56]
Then, I think that in terms of play facilities,
yes,
[33:58]
I think that was more a reflection on a more
detailed conception
[34:01]
that we can see. Making installations that
require
[34:04]
less maintenance on this side, but also,
[34:07]
yes, as far as the trees are concerned,
[34:08]
there needs to be a path so that we can redo
some of the maintenance.
[34:11]
Maybe, Mira, you could answer for the trees.
Yes, that's it.
[34:13]
In fact, I can add ...(inaudible)...
[34:17]
...(inaudible)...
[34:18]
...(inaudible)...
[34:22]
...(inaudible)...
[34:26]
...(inaudible)....
[34:29]
...(inaudible)...
[34:30]
The arrival of machinery ...(inaudible)...
[34:33]
...(inaudible)..., but it's not necessary at
this level,
[34:37]
for ...(inaudible)...
[34:39]
...(inaudible)... as she was saying ...(inaudible)...
[34:43]
a pruning ...(inaudible)... trees that are
tall enough.
[34:45]
...(inaudible)... that grow on top of the building.
Therefore, maintenance
[34:49]
pruning from the roof, that can be done from
the roof.
[34:51]
And a programming...
[34:54]
...(inaudible)...
[35:01]
...(inaudible)...
[35:05]
It's clear
[35:05]
we have tree protection on the premises
[35:08]
around the trees will be necessary, but that's
a detail for later.
[35:11]
My other question: in the area where the chalet
is, the captaincy,
[35:16]
what is the purpose of this space?
[35:18]
It's also a little isolated because of the
parking, which is
[35:22]
well thought out.
[35:23]
You have many islands of greenery in the car
park,
[35:25]
then, after that, there's the green space overlooking
the captaincy.
[35:28]
Is there a purpose here or is this a green,
forested area?
[35:32]
Front or back? Between the captaincy
[35:35]
and the parking lot.
[35:37]
That, it is a picnic area.
[35:39]
Actually, we wanted to juxtapose two types
of space.
[35:42]
So we talked about the grassy plain, which
is an area that,
[35:45]
following the profile of the site, is higher
up the marina.
[35:49]
And, at the moment, I think they have gatherings
in this place, a bit further down.
[35:54]
And then the in-between space,
[35:56]
so we wanted to have picnic tables, a place
to gather
[35:59]
which is close to the car parks, but benefits
more from the trees' cover.
[36:03]
So, being able to enjoy the sun or the space
more of as a gathering place.
[36:07]
This is where we really see that a more
[36:10]
community focus where people will be able to,
first and foremost,
[36:13]
gather to then stroll around the park.
[36:18]
And the trees,
[36:19]
there are several trees added.
[36:22]
enhanced
[36:25]
to make it a place where...
[36:29]
with more vegetation, more shade.
[36:32]
It's a big space. In fact, we imagined
[36:35]
in winter, we could perhaps make a small ice
trail as well.
[36:38]
We're close to the captaincy.
[36:40]
So to try to make the most of the place during
the winter as well.
[36:44]
Yes. It's like a plateau, there's the parking
lot, then there's this plateau.
[36:48]
After that, there's another plateau further
down.
[36:50]
Well, they're light, the plateaux, but they're
like plateaux
[36:53]
at the moment.
[36:56]
Thank you.
[36:59]
Hello,
[37:00]
I had two questions about the accessibility
of certain areas.
[37:04]
So the first area is the bistro section and
the multi-purpose room.
[37:09]
So we can see that there are a lot of stairs.
[37:11]
How do you see the ramp that's actually going
to the other end of the building?
[37:16]
The room...
[37:19]
Sorry, the room...
[37:21]
The bistro and the multi-purpose hall. In H-1.
[37:26]
How...
[37:26]
the acess
[37:28]
coming from the lake, from the park?
[37:30]
OK, we've actually fitted out the side here,
the south side.
[37:36]
As we've explained,
[37:37]
there's a a difference in ground level but
at the same time we are working the soil
[37:42]
that goes up a little further, then we created
a long...
[37:45]
gentle ramp leading up to the terrace.
[37:50]
Here. There will also be some that follow,
actually,
[37:54]
that run alongside the building and provides
access from
[37:58]
from the entrance, yes, from the forecourt.
[38:02]
If not, the multipurpose hall can be reached
from here.
[38:05]
You can go up and down from there.
[38:09]
And, actually, you can see one of the black
triangles there, which is the back
[38:12]
entrance of the library, here, which is close
to the end of this ramp.
[38:16]
And we brought up all the floor levels. We
worked on the ground level
[38:19]
to have ramps at accessible levels,
[38:24]
which are softer than that.
[38:26]
Perfect, my second question,
[38:29]
it's about the youth room
[38:30]
and the activity room.
[38:32]
We can see it a little here in the photo with
the green steps.
[38:36]
Here we have a ramp that runs alongside the
courtyard
[38:42]
and we also have one outside.
[38:44]
So we were able to bring it down the
[38:48]
the courtyard, inside or outside to access
the activity room.
[38:52]
Perfect!
[38:54]
A quick question concerning the computer room.
[38:58]
So there are two places that have been added:
[39:00]
The H-5.1 and H-5.2. We were wondering about
the purposes of these areas were.
[39:05]
In fact, these two rooms were part of the plan.
[39:08]
That's what we called them, but they were part
of the H-5.
[39:12]
The H-5 surface area, it is all this,
[39:14]
but in one of the programs, the program we
received,
[39:18]
there was - there was mention of developing
[39:21]
a photocopying area at the entrance which could
be opened, even
[39:25]
if the room is occupied and can't be accessed.
[39:28]
And also a green screen for taking photos.
[39:32]
That was mentioned in the program. So we followed
that.
[39:35]
Otherwise, if these parts are no longer required,
[39:39]
we can go back to the full size of this room.
[39:54]
Perfect, thank you.
[39:54]
Philippe and Annie, thank you very much.
[39:56]
It's very interesting, and tree conservation
is very commendable.
[40:01]
and the way your building takes shape with
the trees, in fact,
[40:06]
but I'm curious
[40:08]
rather about the urban part, what we call the
reception,
[40:12]
the urban filter. That's your fourth zone at
the top. Because you mentioned
[40:16]
the building's civic scale
[40:20]
and this also implies a civic
[40:23]
typology for the forecourt.
[40:26]
We know that the building
[40:29]
is relatively modest in terms of scales, but
we can see that
[40:34]
you spoke of your desire to make a presence
[40:37]
on Beaconsfield Boulevard.
[40:40]
So my question... We have a whole series of
plantation bubbles
[40:45]
in the forecourt, we have a single-story building.
[40:49]
This gives you a bit of a challenge to
[40:52]
create a real civic presence.
[40:54]
It's a civic amenity in the ...(inaudible)...
[40:56]
Can you explain a little bit your strategies
in these two areas:
[41:00]
the civic presence of the building and the
civic presence
[41:05]
the forecourt as a meeting place
[41:08]
and a gathering place?
[41:11]
Well.
[41:12]
As for the civic part of the building,
[41:14]
I think I was just mentioning that the building
really extends itself.
[41:19]
The shape of the building, too, which is really
like a kind of arch
[41:23]
is welcoming and its range,
[41:26]
I would say, on the site,
[41:28]
gives an impression of
[41:32]
grandeur, if you will, which is to scale for
us.
[41:38]
From Beaconsfield Boulevard,
[41:39]
I think it's going to be quite visible.
[41:41]
Then, for the forecourt, maybe it's... the
view
[41:46]
lacks perhaps a little furnishing, but the
islands are really
[41:50]
positioned to create areas, a forecourt that
will be shaded,
[41:54]
because this forecourt is quite large, and
cleared
[41:57]
areas to allow for activities.
[42:01]
So it's a bit of an area that's included, at
the same time,
[42:05]
that is inscribed in the park, but which opens
up and really becomes like
[42:11]
a civic location
[42:11]
that is mineralized that invites events.
[42:15]
I don't know if I'm answering your question,
but... I think the building
[42:18]
and the landscape
[42:18]
work together a bit.
[42:19]
That's it. The intention is to move the building
back and make way for the forecourt.
[42:23]
And we're even very comfortable
[42:25]
with the car park a little more in the foreground
to, precisely, provide a view,
[42:29]
and notice that there's a space, a building
of some importance,
[42:33]
a place where people can come together.
[42:35]
I think that the City of Beaconsfield...
[42:38]
it remains a modest
[42:39]
building, but that encourages us to discover
the place.
[42:43]
Once you appreciate the site, it's actually
the cultural centre
[42:47]
and the site that become themselves a civic
place.
[42:52]
This means that in this image,
[42:53]
here, we are in the old parking lot,
[42:56]
so we've planted the two mature trees here.
[42:58]
There are a few facing this way.
[43:03]
We would have to look at the plan because there
are some existing ones.
[43:06]
It's quite alright that part of your perspective
is 50 years from now, it doesn't matter,
[43:10]
But there is a tree...
[43:11]
But it's certain that along the car park in
the planted islands,
[43:14]
there's going to be less mature trees. Yes.
[43:20]
Thank you very much.
[43:25]
So, yes, I appreciate the presentation.
[43:28]
I was wondering about something.
[43:29]
Two things,
[43:30]
actually. We talked about trees, the maintenance
[43:32]
of the inner courtyard, it's a technicality,
[43:34]
but nobody is talking about the snow.
[43:43]
you could answer.
[43:44]
You've done several projects like this.
[43:47]
On the contrary, it's a way of bringing Winter
indoors.
[43:50]
The four seasons within the interior space.
[43:55]
And the snow falls in the courtyard, but in
the spring,
[43:58]
it melts and it's not a roof, so everything
seeps into the ground.
[44:04]
It's also very bright in winter, with the snow,
[44:08]
so there really is a kind of reflection effect.
Yes.
[44:13]
Regarding
[44:14]
the access to the marina, well, that's one
aspect of the program...
[44:19]
maybe... I don't know if it was very well defined,
[44:23]
but there is a lot of overlap with the proximity
of the building.
[44:27]
Had you considered a different radius of curvature
[44:33]
or a certain distancing from the buildings
[44:36]
and the activities taking place just behind
it?
[44:39]
This is clearly shown on the site plan.
[44:43]
Yes, that. Exactly.
[44:45]
Maybe just explain? This here?
[44:47]
Well, yes, actually,
[44:49]
because the principle is to go to the marina
until
[44:52]
the water. Yes, but in fact.
[44:57]
What's the question?
[44:57]
So it's in relation to dedicated access? Well,
it's not direct, actually,
[45:02]
is that what you mean?
[45:03]
No, it's more... I don't know...
[45:07]
the intersection of uses. Because there's a
sort of esplanade behind it
[45:12]
the building, which is going to be occupied,
and then we bring people in
[45:16]
with their boats.
[45:19]
I was wondering if it were possible to think
about a route
[45:23]
that's a bit far away or something like that?
[45:28]
In fact, I think... it's a discussion actually,
[45:31]
we don't know how much traffic there is either
[45:34]
to understand what the potential crossover
is.
[45:37]
I think we wanted to make sure there was a
dedicated entrance to ensure
[45:41]
that the regular use of the car park itself
avoids crossovers.
[45:47]
Then it's downhill to the esplanade,
[45:51]
that is the place where there is
[45:52]
a management, mitigation needed.
[45:54]
I think there's a potential to see if
[45:57]
there are other ways, depending on traffic.
[46:01]
In fact, what was most important to us was
to really
[46:04]
clear away; that
[46:06]
cars entering the parking lot
[46:10]
going at low speed, if you will,
[46:13]
but that the crossing
[46:16]
of boats with trailers is outside the entire
access area
[46:21]
of the cultural centre.
[46:26]
I think there was also a desire to make sure
that the marina
[46:29]
be a part of the show, which people in the
library can also see.
[46:34]
So we didn't want to distance ourselves from
this activity.
[46:44]
...(inaudible)...
[46:54]
...(inaudible)...
[46:57]
...(inaudible)...
[47:03]
Landscape waves,
[47:04]
landscape lots in the other direction,
[47:08]
it creates a kind of grid, yes,
[47:12]
that we can see on this plan.
[47:14]
So, once we've established these lines of force,
or these lines on the site,
[47:18]
how does that help you position the building?
[47:21]
It's not clear to me why the building
[47:23]
is there once we've mapped out these two sets
[47:27]
of horizontal and vertical lines. OK.
[47:32]
Well, in fact, the positioning of the building
[47:34]
is both linked to landscape work and the two
are
[47:39]
influenced each other a little, if I may say
so.
[47:42]
In fact, the...
[47:43]
So it's the building that defines the urban
filter?
[47:50]
Actually, the urban filter,
[47:50]
for us, it already existed and then came to
be defined by the building.
[47:55]
So, the urban filter, currently along the boulevard,
[47:57]
is fairly narrow and dense.
[48:00]
And what we wanted
[48:00]
to do, in terms of the building, is to widen
it so that it becomes more of a filter which
is
[48:05]
inviting rather than a barrier.
[48:07]
So that's why we came to expand it.
[48:10]
Then, for us, it was quite important,
[48:12]
as Annie mentioned, to have the building overlap
the site's forested area
[48:17]
which is vacant and becomes a place
[48:18]
which is much more open and community-oriented.
[48:21]
So to do it in juxtaposition. These are elements
that are very...
[48:25]
that are already existing.
[48:26]
So, the grassy plain is really, when you go
to the site,
[48:28]
you can see how people converge on water,
[48:32]
and towards these spaces. So what we also want
to do is
[48:35]
bring people back to the centre of the site,
which is sometimes a little neglected.
[48:39]
To occupy it even more.
[48:43]
In fact, the building is pretty much... If
we...
[48:46]
we cross... we make an X, it's roughly in the
centre of the site.
[48:50]
At the same time, it is quite close to the
boulevard.
[48:54]
in order to be visible from the boulevard,
but also to have a full experience of the park.
[48:58]
It's idea of inserting, in fact, the building
into the trees' canopy.
[49:05]
there. And this idea of having to
[49:08]
keep a large open space for
[49:13]
the people who go all the way down to the marina.
[49:15]
And we turned it into a public space, so we
thought we'd straddle the two,
[49:18]
it was quite an interesting experience and
the animation branch,
[49:22]
which is much more, shall we say, lively with
the multipurpose hall,
[49:26]
the art studios that you can see at the entrance,
etc.
[49:29]
come to settle in this branch; while the library
building and the
[49:34]
administration infiltrate the canopy.
[49:38]
And that's the idea behind the park chalet.
[49:41]
Maybe this will complete the answer.
[49:42]
The park chalet and the Centennial House,
[49:46]
let's say if we keep it, or if we ever demolish
it,
[49:49]
what we were proposing was perhaps to build
[49:51]
a kind of large roof. A sort of park gazebo,
[49:54]
but which ultimately becomes the stage for
gatherings.
[49:58]
They're all, like, in the canopy,
[50:00]
but with their gathering spaces, all three.
[50:04]
So it's this whole organization of the park
[50:06]
with the natural elements that helped us
[50:10]
to position both the building, with its green
roof, also, which
[50:15]
makes it a part of the canopy and its position,
[50:19]
let's say, between the boulevard and the lake.
[50:23]
Then there's the 100-year line here,
[50:26]
so we got close, but not too close, that's
to say
[50:28]
that we kept a safe distance. We thought
[50:31]
it would be a full experience for people in
the building too.
[50:35]
And maybe I can just add...